id stringlengths 21 21 | kind stringclasses 3
values | options listlengths 2 6 | target listlengths 2 6 | state stringlengths 160 227 | question stringclasses 7
values | domain stringclasses 1
value | family stringclasses 1
value | source stringclasses 1
value |
|---|---|---|---|---|---|---|---|---|
v3_98edf02e928314ee_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.39,
0.1,
0.15,
0.17,
0.16,
0.03
] | A cache node creates a single point of failure; additionally satisfies the 1.5m clearance code. Context: under the current lease terms, mid-incident. Reported by the supervisor. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_987a28539fbdc505_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.29,
0.05,
0.1,
0.13,
0.3,
0.13
] | A cache node is within the redundancy requirement; additionally blocks the fire egress path. Context: in the seismic zone, during the morning shift. Reported by the automated check. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_2828ed90e892a0da_n | noul | [
"false",
"true"
] | [
0.96,
0.04
] | The overflow stock blocks the fire egress path; additionally would sit 2m from the water main. Context: in the seismic zone, during the holiday freeze. Reported by the operator. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_e1055583a30431cd_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.01,
0.03,
0.33,
0.63
] | A cache node satisfies the 1.5m clearance code; additionally would sit 2m from the water main. Context: under the current lease terms, mid-incident. Reported by the review queue. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_bb9bee26ec138a79_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.03,
0.05,
0.12,
0.41,
0.37,
0.02
] | The overflow stock shares a circuit already at 82% load; additionally doubles capacity in the constrained zone. Context: under the current lease terms, while legacy systems are still active. Reported by the monitoring system. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_56f36fc39be968c7_n | noul | [
"false",
"true"
] | [
0.27,
0.73
] | The new shelving unit is within the redundancy requirement; additionally doubles capacity in the constrained zone. Context: in facility A, at the end of the fiscal period. Reported by the monitoring system. | Is this scenario one where: the load rating is sufficient? | resource_placement | spatial | yuri_v3 |
v3_59c4d783ebb9d50e_n | noul | [
"false",
"true"
] | [
0.06,
0.94
] | The overflow stock is within the redundancy requirement; additionally satisfies the 1.5m clearance code. Context: under the current lease terms, as part of a compliance sweep. Reported by the monitoring system. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_3d4b69457c76b631_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.02,
0.89,
0,
0.09
] | The backup generator creates a single point of failure; additionally would sit 2m from the water main. Context: in facility A, during peak load. Reported by the automated check. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_4bf885aa107d2ed1_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.17,
0,
0.01,
0.82
] | The overflow stock satisfies the 1.5m clearance code; additionally requires a permit for the added height. Context: in facility A, during peak load. Reported by the supervisor. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_7fbfc1ea3e6e53fc_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0.02,
0.48,
0.26,
0.24
] | A cache node shares a circuit already at 82% load; additionally fits the rated floor load of 400kg/m2. Context: on the mezzanine level, as part of a compliance sweep. Reported by the operator. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_a510a1d495d186ad_n | noul | [
"false",
"true"
] | [
0.65,
0.35
] | The backup generator doubles capacity in the constrained zone; additionally would sit 2m from the water main. Context: on the mezzanine level, during the morning shift. Reported by the on-call engineer. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_ef55fd9ec1e6844b_n | noul | [
"false",
"true"
] | [
0.66,
0.34
] | The new shelving unit requires a permit for the added height; additionally doubles capacity in the constrained zone. Context: in the seismic zone, during peak load. Reported by the supervisor. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_90849ff0ef46f173_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.52,
0.33,
0.1,
0.05,
0,
0
] | A cache node is within the redundancy requirement; additionally satisfies the 1.5m clearance code. Context: under the current lease terms, as part of a compliance sweep. Reported by the supervisor. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_b3b0263b9db77c25_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0,
0.96,
0,
0.04
] | The backup generator satisfies the 1.5m clearance code; additionally creates a single point of failure. Context: on the mezzanine level, mid-incident. Reported by the on-call engineer. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_b062404ce69e2e77_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.02,
0.66,
0,
0.32
] | The backup generator needs climate control the room lacks; additionally is within the redundancy requirement. Context: under the current lease terms, during the holiday freeze. Reported by the supervisor. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_65ea21959f3a3b36_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0,
0,
0,
0.18,
0.82
] | The new shelving unit doubles capacity in the constrained zone; additionally blocks the fire egress path. Context: in the seismic zone, immediately after go-live. Reported by the operator. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_062ac6e47a2e5458_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.01,
0.13,
0.59,
0.24,
0.03,
0
] | A cache node satisfies the 1.5m clearance code; additionally needs climate control the room lacks. Context: under the current lease terms, at the end of the fiscal period. Reported by the automated check. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_442f047724f654ba_n | noul | [
"false",
"true"
] | [
0.67,
0.33
] | A cache node fits the rated floor load of 400kg/m2; additionally creates a single point of failure. Context: in facility A, while legacy systems are still active. Reported by the review queue. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_3f8a09df703f46d5_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.27,
0.47,
0,
0.26
] | The overflow stock requires a permit for the added height; additionally is within the redundancy requirement. Context: in facility A, shortly after a software update. Reported by the operator. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_197717eea6345fb5_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.11,
0,
0.04,
0.85
] | The overflow stock requires a permit for the added height; additionally satisfies the 1.5m clearance code. Context: under the current lease terms, at the end of the fiscal period. Reported by the review queue. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_82371191a8a848a3_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0.86,
0.14,
0,
0
] | A cache node is within the redundancy requirement; additionally satisfies the 1.5m clearance code. Context: in the seismic zone, following a recent audit. Reported by the operator. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_779fef78fed81937_n | noul | [
"false",
"true"
] | [
0.26,
0.74
] | The backup generator creates a single point of failure; additionally fits the rated floor load of 400kg/m2. Context: under the current lease terms, during the quarterly review. Reported by the review queue. | Is this scenario one where: the load rating is sufficient? | resource_placement | spatial | yuri_v3 |
v3_93c3965fbda025fe_n | noul | [
"false",
"true"
] | [
0.28,
0.72
] | The overflow stock needs climate control the room lacks; additionally would sit 2m from the water main. Context: in the seismic zone, at the end of the fiscal period. Reported by the automated check. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_a694863d38303459_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.06,
0.01,
0.01,
0.18,
0.7,
0.04
] | The overflow stock creates a single point of failure; additionally shares a circuit already at 82% load. Context: on the mezzanine level, with staffing at reduced levels. Reported by the review queue. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_6e3bda1125225c5b_n | noul | [
"false",
"true"
] | [
0.2,
0.8
] | A cache node blocks the fire egress path; additionally doubles capacity in the constrained zone. Context: in the seismic zone, during the holiday freeze. Reported by the review queue. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_e1038a098535637f_n | noul | [
"false",
"true"
] | [
0.74,
0.26
] | The new shelving unit creates a single point of failure; additionally shares a circuit already at 82% load. Context: under the current lease terms, shortly after a software update. Reported by the review queue. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_42508d2582cb0962_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0.0202,
0.1414,
0.697,
0.1414,
0
] | The overflow stock requires a permit for the added height; additionally would sit 2m from the water main. Context: on the mezzanine level, during normal operations. Reported by the review queue. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_a2c492ca12e80220_n | noul | [
"false",
"true"
] | [
0.77,
0.23
] | The backup generator requires a permit for the added height; additionally is within the redundancy requirement. Context: under the current lease terms, during normal operations. Reported by the automated check. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_9cd423e1e0b237e1_n | noul | [
"false",
"true"
] | [
0.81,
0.19
] | The overflow stock is within the redundancy requirement; additionally would sit 2m from the water main. Context: in the seismic zone, during normal operations. Reported by the review queue. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_37579da7826ffbdd_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0.01,
0.04,
0.08,
0.57,
0.3
] | The new shelving unit blocks the fire egress path; additionally is within the redundancy requirement. Context: in the seismic zone, shortly after a software update. Reported by the on-call engineer. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_c8adc0620becdc74_n | noul | [
"false",
"true"
] | [
0.56,
0.44
] | A cache node requires a permit for the added height; additionally doubles capacity in the constrained zone. Context: in facility A, during normal operations. Reported by the automated check. | Is this scenario one where: the load rating is sufficient? | resource_placement | spatial | yuri_v3 |
v3_069e3f5407b18de0_n | noul | [
"false",
"true"
] | [
0.37,
0.63
] | The new shelving unit doubles capacity in the constrained zone; additionally is within the redundancy requirement. Context: on the mezzanine level, under reduced staffing. Reported by the monitoring system. | Is this scenario one where: the load rating is sufficient? | resource_placement | spatial | yuri_v3 |
v3_ef7570382fbc78e6_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.08,
0.01,
0.01,
0.13,
0.72,
0.05
] | The new shelving unit creates a single point of failure; additionally shares a circuit already at 82% load. Context: in the seismic zone, under an active deadline. Reported by the review queue. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_2ad62ebd4ac7554e_n | noul | [
"false",
"true"
] | [
0.71,
0.29
] | The backup generator creates a single point of failure; additionally doubles capacity in the constrained zone. Context: on the mezzanine level, under reduced staffing. Reported by the automated check. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_32505c53bbe2d9c6_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.01,
0.04,
0.12,
0.47,
0.33,
0.03
] | The backup generator needs climate control the room lacks; additionally doubles capacity in the constrained zone. Context: in the seismic zone, following a recent audit. Reported by the supervisor. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_4348e79d19d1d0ab_n | noul | [
"false",
"true"
] | [
0.73,
0.27
] | The backup generator requires a permit for the added height; additionally creates a single point of failure. Context: in the seismic zone, with staffing at reduced levels. Reported by the on-call engineer. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_9b3d2d9db3bec823_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0.53,
0.39,
0.04,
0.04
] | The overflow stock fits the rated floor load of 400kg/m2; additionally would sit 2m from the water main. Context: under the current lease terms, immediately after go-live. Reported by the supervisor. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_f257af651294107b_n | noul | [
"false",
"true"
] | [
0.56,
0.44
] | The new shelving unit needs climate control the room lacks; additionally requires a permit for the added height. Context: in facility A, with staffing at reduced levels. Reported by the on-call engineer. | Is this scenario one where: the load rating is sufficient? | resource_placement | spatial | yuri_v3 |
v3_99498a2c7504790c_n | noul | [
"false",
"true"
] | [
0.17,
0.83
] | The overflow stock requires a permit for the added height; additionally satisfies the 1.5m clearance code. Context: under the current lease terms, while on-call rotation changed. Reported by the review queue. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_e7518b0a29be9bd8_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0.01,
0.04,
0.59,
0.36,
0
] | The overflow stock would sit 2m from the water main; additionally requires a permit for the added height. Context: in the seismic zone, with a new vendor onboarded. Reported by the on-call engineer. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_ed2b077669a44ef7_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0,
0,
0.03,
0.54,
0.43
] | The overflow stock blocks the fire egress path; additionally creates a single point of failure. Context: in the seismic zone, shortly after a software update. Reported by the supervisor. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_465eedf8a2b7bb8f_n | noul | [
"false",
"true"
] | [
0.74,
0.26
] | The overflow stock would sit 2m from the water main; additionally satisfies the 1.5m clearance code. Context: in the seismic zone, shortly after a software update. Reported by the automated check. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_fa72e835661d3b78_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0,
0.01,
0.62,
0.37
] | The new shelving unit blocks the fire egress path; additionally satisfies the 1.5m clearance code. Context: in facility A, during an external partner integration. Reported by the operator. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_4d35058904ee9c42_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.34,
0.3,
0.02,
0.34
] | The backup generator fits the rated floor load of 400kg/m2; additionally needs climate control the room lacks. Context: under the current lease terms, during normal operations. Reported by the operator. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_fd2d3864d94766e7_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.16,
0.11,
0.17,
0.44,
0.11,
0.01
] | A cache node needs climate control the room lacks; additionally fits the rated floor load of 400kg/m2. Context: in the seismic zone, during a scheduled maintenance window. Reported by the review queue. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_17c531012eed4d58_n | noul | [
"false",
"true"
] | [
0.97,
0.03
] | The new shelving unit blocks the fire egress path; additionally requires a permit for the added height. Context: in the seismic zone, during the system migration. Reported by the operator. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_67d30406c427a21a_n | noul | [
"false",
"true"
] | [
0.73,
0.27
] | The overflow stock requires a permit for the added height; additionally fits the rated floor load of 400kg/m2. Context: in the seismic zone, following a recent audit. Reported by the review queue. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_8e831b379dc75b1d_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0,
0,
0.13,
0.85,
0.02
] | The overflow stock requires a permit for the added height; additionally shares a circuit already at 82% load. Context: in the seismic zone, under reduced staffing. Reported by the automated check. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_af9a68a69969568c_n | noul | [
"false",
"true"
] | [
0.83,
0.17
] | The overflow stock shares a circuit already at 82% load; additionally requires a permit for the added height. Context: in the seismic zone, during the holiday freeze. Reported by the on-call engineer. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_071ed0b0b150305c_n | noul | [
"false",
"true"
] | [
0.82,
0.18
] | The overflow stock is within the redundancy requirement; additionally would sit 2m from the water main. Context: in the seismic zone, during a scheduled maintenance window. Reported by the automated check. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_f0502d4617015c2b_n | noul | [
"false",
"true"
] | [
0.24,
0.76
] | The overflow stock is within the redundancy requirement; additionally doubles capacity in the constrained zone. Context: in the seismic zone, mid-incident. Reported by the on-call engineer. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_e6b065aa5963a71f_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0.01,
0.9,
0.06,
0.03
] | The backup generator is within the redundancy requirement; additionally needs climate control the room lacks. Context: in facility A, during an external partner integration. Reported by the supervisor. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_91676a08a937bd2f_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.07,
0,
0.02,
0.91
] | The overflow stock requires a permit for the added height; additionally satisfies the 1.5m clearance code. Context: on the mezzanine level, during the morning shift. Reported by the monitoring system. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_9b656b06728c0a20_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0,
0.35,
0.28,
0.37
] | The overflow stock doubles capacity in the constrained zone; additionally shares a circuit already at 82% load. Context: in facility A, with a new vendor onboarded. Reported by the supervisor. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_1f8ee431191a0524_n | noul | [
"false",
"true"
] | [
0.88,
0.12
] | The overflow stock requires a permit for the added height; additionally needs climate control the room lacks. Context: in the seismic zone, while legacy systems are still active. Reported by the on-call engineer. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_02f1e4f0a6ba36a4_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0.01,
0.03,
0.1,
0.59,
0.27
] | The overflow stock is within the redundancy requirement; additionally blocks the fire egress path. Context: in facility A, under reduced staffing. Reported by the on-call engineer. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_696ebfb44fae1405_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.03,
0.13,
0.22,
0.41,
0.2,
0.01
] | The overflow stock fits the rated floor load of 400kg/m2; additionally doubles capacity in the constrained zone. Context: under the current lease terms, under an active deadline. Reported by the review queue. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_54682fbd65173542_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0,
0.74,
0,
0.26
] | A cache node would sit 2m from the water main; additionally creates a single point of failure. Context: in the seismic zone, while legacy systems are still active. Reported by the operator. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_49b1ac9edc74dd26_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.62,
0,
0,
0.38
] | The new shelving unit fits the rated floor load of 400kg/m2; additionally would sit 2m from the water main. Context: on the mezzanine level, during normal operations. Reported by the review queue. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_4eb48469ea3cdfbd_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.17,
0.06,
0.12,
0.19,
0.34,
0.12
] | The overflow stock fits the rated floor load of 400kg/m2; additionally blocks the fire egress path. Context: under the current lease terms, during normal operations. Reported by the operator. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_d8c60b48c77697c2_n | noul | [
"false",
"true"
] | [
0.57,
0.43
] | The overflow stock satisfies the 1.5m clearance code; additionally needs climate control the room lacks. Context: on the mezzanine level, during the morning shift. Reported by the supervisor. | Is this scenario one where: the load rating is sufficient? | resource_placement | spatial | yuri_v3 |
v3_766a70ad046341ef_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.38,
0.26,
0.15,
0.15,
0.05,
0.01
] | The overflow stock satisfies the 1.5m clearance code; additionally is within the redundancy requirement. Context: in the seismic zone, immediately after go-live. Reported by the operator. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_bcffffce4b59be60_n | noul | [
"false",
"true"
] | [
0.67,
0.33
] | The backup generator requires a permit for the added height; additionally needs climate control the room lacks. Context: under the current lease terms, with a new vendor onboarded. Reported by the operator. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_e46d8213ca86c30b_n | noul | [
"false",
"true"
] | [
0.87,
0.13
] | The backup generator satisfies the 1.5m clearance code; additionally is within the redundancy requirement. Context: in the seismic zone, under an active deadline. Reported by the operator. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_832c3d4a1292e3e0_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.01,
0.05,
0.17,
0.31,
0.36,
0.1
] | The new shelving unit doubles capacity in the constrained zone; additionally needs climate control the room lacks. Context: under the current lease terms, mid-incident. Reported by the operator. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_099c27d16a95ffcc_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.05,
0.01,
0.01,
0.93
] | A cache node would sit 2m from the water main; additionally fits the rated floor load of 400kg/m2. Context: in the seismic zone, at the end of the fiscal period. Reported by the on-call engineer. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_309b139b945ee3be_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0,
0.99,
0,
0.01
] | A cache node is within the redundancy requirement; additionally requires a permit for the added height. Context: on the mezzanine level, during the holiday freeze. Reported by the review queue. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_5b68e6b61af0f4c5_n | noul | [
"false",
"true"
] | [
0.97,
0.03
] | A cache node shares a circuit already at 82% load; additionally blocks the fire egress path. Context: under the current lease terms, under reduced staffing. Reported by the on-call engineer. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_959fcff0eac0d80b_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0,
0.92,
0.01,
0.07
] | The overflow stock requires a permit for the added height; additionally fits the rated floor load of 400kg/m2. Context: in the seismic zone, during the morning shift. Reported by the automated check. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_1e26ca22a70b46da_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.2,
0.55,
0,
0.25
] | The new shelving unit is within the redundancy requirement; additionally fits the rated floor load of 400kg/m2. Context: on the mezzanine level, following a recent audit. Reported by the monitoring system. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_bfa13043df0f6f9e_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0,
0.01,
0.2,
0.74,
0.05
] | The backup generator needs climate control the room lacks; additionally creates a single point of failure. Context: in the seismic zone, during the holiday freeze. Reported by the on-call engineer. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_1da97c862be1f2b5_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0,
0,
0.73,
0.27
] | The overflow stock needs climate control the room lacks; additionally blocks the fire egress path. Context: on the mezzanine level, immediately after go-live. Reported by the supervisor. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_6efdbeee476dcde6_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0,
0.02,
0.05,
0.51,
0.42
] | The backup generator blocks the fire egress path; additionally is within the redundancy requirement. Context: on the mezzanine level, during peak load. Reported by the automated check. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_3ee3ed2a8c346d12_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.16,
0.04,
0.1,
0.57,
0.13,
0
] | The overflow stock needs climate control the room lacks; additionally would sit 2m from the water main. Context: on the mezzanine level, as part of a compliance sweep. Reported by the supervisor. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_900f59ca8ffe2558_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0,
0,
0.62,
0.38
] | The new shelving unit blocks the fire egress path; additionally fits the rated floor load of 400kg/m2. Context: in the seismic zone, while on-call rotation changed. Reported by the review queue. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_f6549221666256be_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.1,
0.05,
0.17,
0.51,
0.16,
0.01
] | The new shelving unit is within the redundancy requirement; additionally shares a circuit already at 82% load. Context: under the current lease terms, during peak load. Reported by the monitoring system. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_fdd9f7a0d4322f89_n | noul | [
"false",
"true"
] | [
0.59,
0.41
] | The overflow stock is within the redundancy requirement; additionally blocks the fire egress path. Context: in facility A, at the end of the fiscal period. Reported by the supervisor. | Is this scenario one where: the load rating is sufficient? | resource_placement | spatial | yuri_v3 |
v3_d50d09d4e8d3d76c_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.25,
0.03,
0.03,
0.69
] | The overflow stock satisfies the 1.5m clearance code; additionally needs climate control the room lacks. Context: in facility A, with a new vendor onboarded. Reported by the on-call engineer. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_b6cbabbcbfe696fd_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.02,
0.07,
0.42,
0.38,
0.1,
0.01
] | The backup generator creates a single point of failure; additionally fits the rated floor load of 400kg/m2. Context: in facility A, immediately after go-live. Reported by the operator. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_37c614fa9f2708ff_n | noul | [
"false",
"true"
] | [
0.83,
0.17
] | A cache node shares a circuit already at 82% load; additionally blocks the fire egress path. Context: in the seismic zone, as part of a compliance sweep. Reported by the review queue. | Is this scenario one where: the load rating is sufficient? | resource_placement | spatial | yuri_v3 |
v3_666fbec2978df0f6_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.07,
0.15,
0.23,
0.27,
0.14,
0.14
] | A cache node is within the redundancy requirement; additionally doubles capacity in the constrained zone. Context: under the current lease terms, at the end of the fiscal period. Reported by the monitoring system. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_e9357e99db42f19a_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0,
0.02,
0.05,
0.45,
0.48
] | The new shelving unit fits the rated floor load of 400kg/m2; additionally blocks the fire egress path. Context: on the mezzanine level, during the holiday freeze. Reported by the review queue. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_2e860e53217bc77a_n | noul | [
"false",
"true"
] | [
0.13,
0.87
] | The backup generator satisfies the 1.5m clearance code; additionally requires a permit for the added height. Context: in facility A, shortly after a software update. Reported by the supervisor. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_6abfb9d0ba5406fe_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.25,
0.13,
0.15,
0.32,
0.14,
0.01
] | A cache node requires a permit for the added height; additionally is within the redundancy requirement. Context: in the seismic zone, mid-incident. Reported by the supervisor. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_9e098990dd251dec_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0,
0.98,
0.01,
0.01
] | A cache node satisfies the 1.5m clearance code; additionally requires a permit for the added height. Context: in the seismic zone, as part of a compliance sweep. Reported by the supervisor. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_ca947981eeedeb76_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0.02,
0.06,
0.65,
0.26,
0.01
] | A cache node shares a circuit already at 82% load; additionally would sit 2m from the water main. Context: in facility A, as part of a compliance sweep. Reported by the review queue. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_65ea21959f3a3b36_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0,
0,
0.38,
0.62
] | The new shelving unit doubles capacity in the constrained zone; additionally blocks the fire egress path. Context: in the seismic zone, immediately after go-live. Reported by the operator. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_9de42a452426f58f_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.01,
0.25,
0.46,
0.27,
0.01,
0
] | A cache node is within the redundancy requirement; additionally requires a permit for the added height. Context: under the current lease terms, during the system migration. Reported by the review queue. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_28a6617a110ce8d9_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0,
0.04,
0.55,
0.41,
0
] | The backup generator shares a circuit already at 82% load; additionally creates a single point of failure. Context: under the current lease terms, while on-call rotation changed. Reported by the operator. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_066ead9af7f157cb_n | noul | [
"false",
"true"
] | [
0.85,
0.15
] | The new shelving unit satisfies the 1.5m clearance code; additionally fits the rated floor load of 400kg/m2. Context: on the mezzanine level, following a recent audit. Reported by the supervisor. | Is this scenario one where: relocation is required? | resource_placement | spatial | yuri_v3 |
v3_1ca68ebc4c1a6804_n | noul | [
"false",
"true"
] | [
0.67,
0.33
] | The overflow stock would sit 2m from the water main; additionally creates a single point of failure. Context: under the current lease terms, shortly after a software update. Reported by the automated check. | Is this scenario one where: the placement meets code? | resource_placement | spatial | yuri_v3 |
v3_5462233378e8e8bf_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0,
0,
0.05,
0.07,
0.46,
0.42
] | The overflow stock is within the redundancy requirement; additionally blocks the fire egress path. Context: under the current lease terms, during peak load. Reported by the automated check. | Rate code-compliance risk for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_ac6f328deb6bc421_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0,
0.4,
0.04,
0.56
] | The new shelving unit creates a single point of failure; additionally requires a permit for the added height. Context: on the mezzanine level, under an active deadline. Reported by the review queue. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_f4bfe375a901af58_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0.91,
0.07,
0.01,
0.01
] | The new shelving unit would sit 2m from the water main; additionally satisfies the 1.5m clearance code. Context: in facility A, with a new vendor onboarded. Reported by the automated check. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_6022623dba863c36_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.02,
0.01,
0.01,
0.96
] | A cache node needs climate control the room lacks; additionally satisfies the 1.5m clearance code. Context: in the seismic zone, mid-incident. Reported by the supervisor. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_fc1789a9589105a5_c | choice | [
"approved",
"approved_with_conditions",
"relocate",
"reject"
] | [
0,
0.09,
0.61,
0.3
] | The overflow stock doubles capacity in the constrained zone; additionally needs climate control the room lacks. Context: in the seismic zone, at the end of the fiscal period. Reported by the automated check. | Placement for this scenario. | resource_placement | spatial | yuri_v3 |
v3_b9f306a0355a0d26_s | score | [
"0",
"1",
"2",
"3",
"4",
"5"
] | [
0.07,
0.01,
0.02,
0.11,
0.73,
0.06
] | The overflow stock creates a single point of failure; additionally needs climate control the room lacks. Context: in the seismic zone, at the end of the fiscal period. Reported by the on-call engineer. | Rate capacity gain for this scenario on a 0-5 scale. | resource_placement | spatial | yuri_v3 |
v3_f715573f5b0cf9ee_n | noul | [
"false",
"true"
] | [
0.67,
0.33
] | The overflow stock would sit 2m from the water main; additionally requires a permit for the added height. Context: on the mezzanine level, during peak load. Reported by the supervisor. | Is this scenario one where: the load rating is sufficient? | resource_placement | spatial | yuri_v3 |
v3_794b49916fade107_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.35,
0,
0.01,
0.64
] | The new shelving unit fits the rated floor load of 400kg/m2; additionally satisfies the 1.5m clearance code. Context: on the mezzanine level, shortly after a software update. Reported by the operator. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
v3_ea1698f48b6fd5c6_c | choice | [
"capacity",
"redundancy",
"accessibility",
"safety"
] | [
0.67,
0,
0.01,
0.32
] | A cache node doubles capacity in the constrained zone; additionally requires a permit for the added height. Context: in facility A, during the system migration. Reported by the automated check. | Priority zone for this scenario. | resource_placement | spatial | yuri_v3 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.