instruction
stringlengths
5
9.45k
output
stringclasses
27 values
class_id
int32
0
26
Unit - Plant Fuel Oil and Slop Tankage. The Plant Fuel Oil and Slop Tankage Unit include the following systems:. a Dry Slop. Two tanks are provided, sized for , m (, BBL) total capacity to receive dry slop. from OSBL and Process Units Dry slop is sent to the CDU for processing. b Wet Slop. Two tanks are provided, si...
Plant Name
17
Unit – General Storage Unit (Tankage / Piping). Storage consists of the following tankage and its associated support systems, such as transfer. pumps, tank gauging, scraper launcher/receiver stations:.  Crude Tankage.  Intermediate Tankage.  Finished Product Tankage. The tankage requirements are based on requ...
Plant Name
17
Unit - Interconnecting Piperack. Interconnecting Pipe rack includes associated piping required to supply and/or transfer raw. materials, products, and utilities to/from various units within the ZOR. Utility systems are installed in the offsite areas to supply various utilities to the process units The. interconnecting...
Plant Name
17
Unit - Sour Water Stripper (SWS) Unit. The Sour Water Stripper (SWS) unit consists of three % parallel plants This configuration. allows for maintenance of one plant while still providing % processing capacity During normal. operation, all three plants are expected to be in operation, each plant processing one third o...
Plant Name
17
Unit - Amine Regeneration Unit (ARU). The Amine Regeneration Unit (ARU) consists of three % plants This configuration allows for. maintenance of one plant while still providing % processing capacity During normal operation,. all three plants are expected to be in operation, each plant processing one third of the total...
Plant Name
17
Overview. ZOR is divided geographically into five EPC Contract Packages In addition a Site Preparation. Contract has been awarded A Main Automation Contract (MAC) has been awarded for Phase . Works only The following are the EPC Contract Packages:.  EPC Package #– Main Process Units - ZOR/EPC--A.  EPC Packag...
Plant Name
17
Unit – Emergency Shelter Areas. Refer to Appendix A and Appendix C of this Exhibit A Scope of Work for the project building list,. PNRP This list provides the emergency shelter name, type, number and notes. on the emergency shelters The list also specifies for each emergency shelters the Contractor. who shall be res...
Plant Name
17
Unit - Air Systems. The air systems for the ZOR include Plant Air (AP), Instrument Air (AI), and Nitrogen (N). a Plant and Instrument Air. AP and AI will be routed through separate header systems that will be supplied by. compressors common to both systems To improve reliability of the instrument air supply,. process ...
Plant Name
17
Unit - Sulphur Recovery Units (SRU) and Tail Gas Treating Unit (TGTU). The acid gas generated in the SWS and ARU will be sent to SRU/TGTU for destruction of. ammonia, extraction of elemental sulphur from the H S, and oxidation of remaining contaminants. The process scheme for each SRU/TGTU plant includes the followin...
Plant Name
17
Unit - Steam Generation Unit. The ZOR requires steam for turbine driven pumps and compressors and for process heating and. process feed The steam requirements for the ZOR include High Pressure (SH), Medium. Pressure (SM), Intermediate Pressure (SI), and Low Pressure (SL) steam This steam is. generated from a combinati...
Plant Name
17
Units and – Naphtha Hydrotreating Units (NHTU). The Naphtha Hydro Treating Units (NHTU) treat Sm /h (, BPSD) straight run. naphtha produced in the CDUs to produce a naphtha product with low sulphur and non-detectable. metals content suitable for use as hydrogen plant feedstock NHTU will process all Eocene. naphtha ...
Plant Name
17
Unit - Water Systems. The water systems planned for ZOR includes the following:. a Polished Water. The desalinated water supplied from MEW will be demineralized, mixed with returned steam. condensate and fed to a mixed bed polisher for treatment prior to sending to the steam. system The polished water will be inventor...
Plant Name
17
Unit - Saturated Gas Units (SGU). The Saturated Gas Unit (SGU) consists of two Sm /h (, BPSD) % plants This. configuration allows for maintenance of one plant while still providing % processing capacity. During normal operation, both plants are expected to be in operation, each plant processing %. of the total feed....
Plant Name
17
Unit Sulfur Storage Area. The liquid sulphur system contains four tanks, one of which is an operating spare The four. independently operating , metric ton (, BBL) storage tanks provide a total of fourteen. days storage. The liquid sulphur tanks provide both surge and holdup capacity to dampen the effects of process. u...
Plant Name
17
Unit Small Boat Harbour. The Small Boat Harbour consists of a harbour with a sheltered approach, berthing areas for. support craft (tugs, mooring line boats, etc), fuelling depot, and other infrastructure as required. for operation of this facility Landward of the harbour is the Marine Operations Building Complex. tha...
Plant Name
17
Unit - Wastewater Treating. The Wastewater Treatment System collects the various wastewater streams into one of seven. classifications Each classification of wastewater receives different approaches to treatment. depending on the type and levels of contamination After treatment, the various segregated. effluents will ...
Plant Name
17
Work Breakdown Structure (WBS). Contractor shall each be responsible for the management, administration, coordination,. documentation, execution and control of the Work and provisional turnover of the facility to. Company including all final documentation. Company will review and monitor Contractor’s execution performa...
Plant Name
17
Units and – Naphtha Hydrotreating Units (NHTU). The Naphtha Hydro Treating Units (NHTU) treat Sm /h (, BPSD) straight run. naphtha produced in the CDUs to produce a naphtha product with low sulphur and non-detectable. metals content suitable for use as hydrogen plant feedstock NHTU will process all Eocene. naphtha ...
Plant Type
18
Description of Project. Company plans to build a new world class refinery, the Al Zour Refinery (ZOR), to supply both. their domestic and world market demand for ultra-low sulphur petroleum products. ZOR will be built in two stages The first stage, which is the focus of this Contract, is. environmentally driven to prov...
Plant Type
18
Unit - Steam Generation Unit. The ZOR requires steam for turbine driven pumps and compressors and for process heating and. process feed The steam requirements for the ZOR include High Pressure (SH), Medium. Pressure (SM), Intermediate Pressure (SI), and Low Pressure (SL) steam This steam is. generated from a combinati...
Plant Type
18
Unit - Wastewater Treating. The Wastewater Treatment System collects the various wastewater streams into one of seven. classifications Each classification of wastewater receives different approaches to treatment. depending on the type and levels of contamination After treatment, the various segregated. effluents will ...
Plant Type
18
Work Breakdown Structure (WBS). Contractor shall each be responsible for the management, administration, coordination,. documentation, execution and control of the Work and provisional turnover of the facility to. Company including all final documentation. Company will review and monitor Contractor’s execution performa...
Plant Type
18
Unit - Amine Regeneration Unit (ARU). The Amine Regeneration Unit (ARU) consists of three % plants This configuration allows for. maintenance of one plant while still providing % processing capacity During normal operation,. all three plants are expected to be in operation, each plant processing one third of the total...
Plant Type
18
Unit – Hydrogen Production Units (HPU). To meet the hydrogen needs of the ARDS and Hydrotreaters, facilities will be provided to. generate hydrogen The Hydrogen Production Units (HPU) consists of four identical. ,Nm /h ( MMSCFD) trains that use steam reforming processes to generate Hydrogen. Feed to the HPU will be h...
Plant Type
18
Unit – Main Electrical System. The main Electrical system comprises the following:. Main Incoming Substation -MIS-. The main kV Gas Insulated Switchgear (GIS) switchboard which receives the kV. incoming supplies from Al Zour South Power station, and provides outgoing circuits to feed. the Main kV/kV MVA step down t...
Plant Type
18
Unit - Plant Fuel Oil and Slop Tankage. The Plant Fuel Oil and Slop Tankage Unit include the following systems:. a Dry Slop. Two tanks are provided, sized for , m (, BBL) total capacity to receive dry slop. from OSBL and Process Units Dry slop is sent to the CDU for processing. b Wet Slop. Two tanks are provided, si...
Plant Type
18
Units , and – Diesel Hydrotreating Units (DHTU). The Diesel Hydro Treating Units (DHTU) treat Sm /h (, BPSD) of distillate produced. in the CDU and ARDS to produce Ultra-Low Sulphur Diesel (ULSD) The DHTU is also designed. to meet Cold Filter Plug Point (CFPP) specification of maximum - o C during summer operation....
Plant Type
18
Unit - Saturated Gas Units (SGU). The Saturated Gas Unit (SGU) consists of two Sm /h (, BPSD) % plants This. configuration allows for maintenance of one plant while still providing % processing capacity. During normal operation, both plants are expected to be in operation, each plant processing %. of the total feed....
Plant Type
18
Overall Refinery Description. The ZOR refinery configuration is a hydro skimming refinery as shown in Figure - Overall. Refinery Block Flow Diagram of this Exhibit A The Overall Block Flow Diagram, reference. drawing number PNRP----B, is also included in Appendix A of this Exhibit A
Plant Type
18
Unit - Water Systems. The water systems planned for ZOR includes the following:. a Polished Water. The desalinated water supplied from MEW will be demineralized, mixed with returned steam. condensate and fed to a mixed bed polisher for treatment prior to sending to the steam. system The polished water will be inventor...
Plant Type
18
Overview. ZOR is divided geographically into five EPC Contract Packages In addition a Site Preparation. Contract has been awarded A Main Automation Contract (MAC) has been awarded for Phase . Works only The following are the EPC Contract Packages:.  EPC Package #– Main Process Units - ZOR/EPC--A.  EPC Packag...
Plant Type
18
Description of Site. The project site, covering approximately million square metres, will be located in Al Zour,. Kuwait. The following plot plan and scope split drawings are located in Exhibit A, Appendix A:.  PNRP----T- Rev U, Overall Site Plan Al-Zour.  PNRP----T- Rev A, Overall Al-Zour Site Plan East – Shorel...
Plant Type
18
Figure : Overall Site Plan Al Zour. Figure Overall Site Plan Al Zour Site Plan East – Shoreline Approach. Figure : OverallSite Plan Al Zour Site Plan West - Main Refinery Area
Plant Type
18
Units , and – Atmospheric Residue Desulphurization (ARDS) Units. The Atmospheric Residue Desulphurization (ARDS) units consist of three identical Sm /h. (, BPSD) processing units, each with two reactor trains Atmospheric residue from the. CDU is pre-heated and then fed through reactor catalyst beds in a hydrogen ri...
Plant Type
18
Unit – Construction Dock. A construction dock for offloading of heavy lift items only (All required loading and unloading. equipment and items to be provided by Contractor) is being constructed by the Site Preparation. Contractor, refer to Appendix A and Appendix C of this Exhibit A scope of work for details of the....
Plant Type
18
Unit - Sour Water Stripper (SWS) Unit. The Sour Water Stripper (SWS) unit consists of three % parallel plants This configuration. allows for maintenance of one plant while still providing % processing capacity During normal. operation, all three plants are expected to be in operation, each plant processing one third o...
Plant Type
18
Unit - Air Systems. The air systems for the ZOR include Plant Air (AP), Instrument Air (AI), and Nitrogen (N). a Plant and Instrument Air. AP and AI will be routed through separate header systems that will be supplied by. compressors common to both systems To improve reliability of the instrument air supply,. process ...
Plant Type
18
Unit – General Storage Unit (Tankage / Piping). Storage consists of the following tankage and its associated support systems, such as transfer. pumps, tank gauging, scraper launcher/receiver stations:.  Crude Tankage.  Intermediate Tankage.  Finished Product Tankage. The tankage requirements are based on requ...
Plant Type
18
Unit - Inter-refinery Transfer Pipelines. The Inter-refinery Transfer Pipelines are routed in a metre wide Right of Way (ROW) being. provided by KOC The ROW includes the following services:.  Four crude pipelines for KEC (”), KHC (”) and Eocene (”) and Lower Fars (”) will be. provided by KOC up to the ZOR fence li...
Plant Type
18
Unit - Sulphur Recovery Units (SRU) and Tail Gas Treating Unit (TGTU). The acid gas generated in the SWS and ARU will be sent to SRU/TGTU for destruction of. ammonia, extraction of elemental sulphur from the H S, and oxidation of remaining contaminants. The process scheme for each SRU/TGTU plant includes the followin...
Plant Type
18
Description of Project. Company plans to build a new world class refinery, the Al Zour Refinery (ZOR), to supply both. their domestic and world market demand for ultra-low sulphur petroleum products. ZOR will be built in two stages The first stage, which is the focus of this Contract, is. environmentally driven to prov...
Site Location
22
Work Schedules. The Contractor shall develop and the Company shall approve the schedules in respect of the Work. in accordance with Exhibit F and the following provisions of this sub-Clause The Contractor shall. utilize computerized Critical Path Method (CPM) scheduling in the Precedence Diagramming. Method (PDM) forma...
Schedule
21
Long Lead Equipment. Technical Request for Quotation (RFQ) packages for long lead equipment and Company. purchase orders and/or contracts to be assigned to Contractor along with associated terms and. conditions are included in Part II, Section , Exhibit L. Refer to Exhibit L Table of Contents for all available informat...
LLI
12
“Long Lead Items” means those items included in and more fully described in Exhibit L
LLI
12
Technical RFQ Packages. Specific equipment items have been identified as Long Lead Equipment Draft technical inquiry. packages for these items are included in Part II, Section , Exhibit L The inquiry packages are. intended to assist the Contractor in early purchase Contractor is responsible to check and verify. accura...
LLI
12
Schedule Recovery. If the Work is proceeding at such a rate of progress that could in the opinion of the. Company result in delay to Provisional Turnover of any Portion beyond the relevant. Scheduled Provisional Turnover Date, or to any delay to the date of Turnover of an EPC. Package which is attributable to the Contr...
Delay
5
Notwithstanding any provision herein to the contrary, the Company reserves the right at any. time to require the Contractor to alter any sequence for the construction, tie-in work and/or. Precommissioning or Commissioning of the Work or any portion thereof as the Company. may consider to be desirable for the proper and...
Delay
5
Within one hundred eighty () days from the Commencement Date, the Contractor shall. submit to the Company the other part of the Master Schedule for the construction phase of. the Work at the Site which shall indicate, in accordance with the provisions hereof, how the. Contractor shall achieve the requirements of the Co...
Delay
5
Precommissioning. To enable any Portion of the Work to be placed into operation at the earliest practicable date, the. Contractor shall commence the Precommissioning of the items required for the safe Commissioning. and operation of that Portion At least three () months before scheduled Precommissioning for. each Porti...
Completion
3
Project Completion Schedule. Company’s required Scheduled Provisional Turnover Dates are located in Part II, Section , Exhibit O Contractor shall provide corresponding Mechanical Completion commitments and. these shall be included in the referenced Exhibit
Completion
3
Without prejudice to any other provision of the Contract, the Work shall comprise the provision of. each and every item, including but not limited to, all material, equipment, tools and manpower. necessary to perform all works and services required for the design, engineering, procurement,. inspection and testing, cons...
Man Hour
14
Contractor shall be entitled to the payment of each of the above. installments within thirty () days of Company’s receipt of Contractor’s. invoice on the conditions that:. a) Contractor complies with the prerequisite conditions stated above;. and. b) Contractor provides to the Company an Advance Payment Bond in. the fo...
Payment Terms Conditions
16
Advance Payments. The Contractor shall be entitled, after signing of the Contract by both the Parties, to. a total advance amount of ten percent ( %) of the Total Lump Sum Price as at the. date of signing (the “Advance Payment”) in accordance with the following schedule:. % Within Days from the Commencement Date, sub...
Payment Terms Conditions
16
“Advance Payment Bond” has the meaning given in sub-Clause
Payment Terms Conditions
16
Ninety-five percent (%) of the invoice value, which shall be. as mentioned in sub-Clause herein, shall be paid within the. time mentioned in sub-Clause herein, with five percent (%). of the same invoice value being retained until the date of issue of. the Acceptance Certificate for the relevant EPC Package in. accord...
Payment Terms Conditions
16
Progress Payments. Each Progress Invoice submittal shall be accompanied by a Progress. Payment Release as per Exhibit F, Subpart , Attachment F-. Prior to the tenth ( th ) of the following month, the Contractor shall submit. to the Superintendent an invoice for the previous month in respect of each. EPC Package, includ...
Payment Terms Conditions
16
Contractor shall not be eligible for any advance payments against any. components of Total Sums for Miscellaneous Works as stated under. Table D of Exhibit D
Payment Terms Conditions
16
As the Company recovers the Advance Payment, the Contractor will be. allowed to reduce the amount of the Advance Payment Bond. incrementally upon the recovery by deduction of the following. percentages of the aggregate Advance Payment so that the remaining. maximum face value of the Advance Payment Bond is equal to the...
Payment Terms Conditions
16
Contractor shall be entitled to the payment of each of the above. installments within thirty () days of Company’s receipt of Contractor’s. invoice on the conditions that:. a) Contractor complies with the prerequisite conditions stated above;. and. b) Contractor provides to the Company an Advance Payment Bond in. the fo...
Bond
2
all relevant Performance Tests have been carried out in accordance with the Contract and. all Laws (including, without limitation, requirements relating to the environment), and either:. (a) the relevant Performance Guarantee is passed on the relevant terms provided for in. the Performance Test Procedure and Exhibit J;...
Bond
2
Payment of any accrued incentive amount to the Contractor is subject to the completion of. commissioning and performance testing of the EPC Package Facilities or EPC Package . Facilities and meeting the Performance Guarantees of the EPC Package Facilities or. EPC Package Facilities (as applicable) (or meeting the ap...
Bond
2
The Performance Bond shall be returned to the Contractor immediately after its expiry in. accordance with this Contract, save where there are pending claims at such date, in which case it. shall be returned following final determination and (if applicable) payment of such claims and shall. in the meantime remain valid ...
Bond
2
Notwithstanding the foregoing, if the Maintenance Period is extended with respect to any part of the. Facilities in accordance with sub-Clause , the Contractor shall arrange for the Performance. Bond to remain valid until the issue of the relevant Final Acceptance Certificate with respect to such. part in an amount equ...
Bond
2
upon the issuance of a Final Acceptance Certificate for each EPC Package, by an amount. equal to two point five percent (%) of the relevant EPC Package Contract Price by. reference to which the said maximum face value of the Performance Bond was most. recently determined,. provided that the Performance Bond shall (subj...
Bond
2
Final Acceptance. Upon the later of the expiry of the last Maintenance Period for all Portions comprising the EPC. Package Facilities or the EPC Package Facilities (as applicable) or the resolution or the. determination of any claim notified during the Maintenance Periods (including the completion of any. repair, rep...
Bond
2
upon the issuance of an Acceptance Certificate for each EPC Package, by an amount equal. to two point five percent (%) of the relevant EPC Package Contract Price by reference to. which the said maximum face value of the Performance Bond was most recently. determined; and
Bond
2
Whenever any cumulative incremental increases in an EPC Package Contract Price equal or. exceed by an amount equivalent to one percent (%) of that EPC Package Contract Price. applicable at the Commencement Date, or the EPC Package Contract Price which triggered any. previous increase in the amount of the Performance Bo...
Bond
2
after the Company’s receipt of an acceptable invoice. providing such Acceptance Certificate in respect of that EPC. Package has been issued. (d) Bank Guarantee in Lieu of Retention. Notwithstanding the above, the Company shall not make any. retention from the payments under this sub-Clause , if the. Contractor provides...
Bond
2
The Contractor shall have delivered to the Company prior to the signing of the Contract a duly. executed bond in the form attached as Exhibit H issued by an Approved Bank in the amount of five. per cent (%) of the Contract Price (the "Performance Bond") Compliance with this Clause is. a condition precedent to the enti...
Bond
2
The payment of Performance Liquidated Damages under sub-Clause above shall be in. complete satisfaction of the Contractor's guarantee to attain the Performance Guarantees to which. the said Performance Liquidated Damages apply and the Contractor shall have no further liability. whatsoever to the Company in respect of ...
Bond
2
“Advance Payment Bond” has the meaning given in sub-Clause
Bond
2
As the Company recovers the Advance Payment, the Contractor will be. allowed to reduce the amount of the Advance Payment Bond. incrementally upon the recovery by deduction of the following. percentages of the aggregate Advance Payment so that the remaining. maximum face value of the Advance Payment Bond is equal to the...
Bond
2
Advanced Process Controls (APC). APC functional requirements are identified in the Process Design Packages (PDPs) for each unit. The APC Vendor shall develop detailed APC functional design specifications, which shall include. any additional instrumentation and analyzer requirements, any computer systems infrastructure....
Human Resources
9
Changes of the Contractor's Personnel/Organization. No changes in the identity of those persons holding the aforesaid key personnel positions shall be. made without the Company's prior agreement whereupon the Contractor shall reissue a new. organization chart reflecting such agreed change The Contractor's key project ...
Key Personnel
11
Project Organization - Site. No later than thirty () Days prior to assigning construction personnel to the Site, the Contractor. shall submit to the Company the Contractor’s project site team (“Project Site Team”) in the form of a. site office organization chart (“Site Office Organization Chart”) and job descriptions p...
Key Personnel
11
Project Organization – Engineering and Procurement Phase. Within a period of thirty () Days after the Commencement Date of this Contract, the Contractor. shall submit to the Company the Contractor's project office team (“Project Office Team”) in the form. of a project office organization chart (“Project Office Organiza...
Key Personnel
11
Neither the Company nor the Contractor shall be obliged to indemnify or hold harmless the. other party pursuant to sub-Clause or above insofar as and to the extent that. such claims, demands or actions made or brought against or liabilities of that other party. are covered by insurance policies effected and maintaine...
Obligation
15
Without prejudice to the Contractor's obligations pursuant to sub-Clause , the Contractor shall. be responsible, at no extra cost to the Company, for the provision of all spare parts necessary for. construction, Precommissioning, Commissioning and insurance spares of the all items of. equipment and material required by...
Obligation
15
Where the Contractor comprises an unincorporated joint venture or consortium consisting of more. than one legal person and acting together as the Contractor, it shall ensure that the execution of. the Work and functions related thereto is allocated among such persons in accordance with the. description set out in the “...
Obligation
15
Subcontractors. In cases where this Clause imposes or purports to impose obligations directly upon. Subcontractors, the Contractor shall ensure compliance of the same by such. Subcontractors
Obligation
15
Where the Contractor comprises a consortium of, joint venture among, or other unincorporated. grouping of, legal entities the obligations and liabilities assumed by, and the covenants, warranties. and undertakings made on the part of, the Contractor under or in connection with the Contract shall. be assumed and made by...
Obligation
15
Final Acceptance. Upon the later of the expiry of the last Maintenance Period for all Portions comprising the EPC. Package Facilities or the EPC Package Facilities (as applicable) or the resolution or the. determination of any claim notified during the Maintenance Periods (including the completion of any. repair, rep...
Obligation
15
For avoidance of doubt, the obligations of the Contractor pursuant to sub-Clause on. account of failure to achieve the Performance Guarantees shall operate independent of the. defect rectification obligations stated in this sub-Clause
Obligation
15
The Company shall allow the Contractor reasonable access to the Facilities and the Site to. enable the Contractor to perform its obligations under this sub-Clause . The Contractor, during such access, shall co-ordinate, communicate and liaise with the. operator and shall act to minimize any outage by performing minor r...
Obligation
15
The Contractor's obligations under this sub-Clause shall not apply to. () any materials which are normally consumed in operation or which have a normal life. shorter than the Maintenance Period stated herein (save that, in each case, the. Contractor's obligations under this sub-Clause shall apply to the extent of any...
Obligation
15
The Contractor, in performing its obligations under the Contract, shall establish and maintain. appropriate business standards, procedures and controls including those necessary to avoid any. real or apparent impropriety or adverse impact on the interests of the Company The Company. shall have the right, but not the ob...
Obligation
15
The Contractor shall permit and cause its Subcontractors to permit, at reasonable times during the. performance of Work and for a period of three () years after termination of the Contractor's. employment under the Contract, or Acceptance of the last EPC Package to achieve Acceptance,. whichever is earlier, authorized ...
Audit
1
The Contractor shall keep and cause its Subcontractors to keep, in accordance with generally. accepted accounting practices, books, records and accounts pertaining to performance of the. Work, including the Contractor’s and Subcontractor’s personnel records, correspondence,. instructions, plans, drawings, receipts, vou...
Audit
1
Audit
Audit
1
Tie-Ins to Existing Facilities and Shutdowns. The following process is set out to provide a management structure for planning and executing. any tie-ins and shutdowns required for the ZOR at any stage up to the expiry of the Maintenance. Period As such the tie-ins and shutdown work may relate to the existing facilities...
Interface
10
Language. The wording of this Contract shall be construed in accordance with the normal usage of the English. language as related to works of this nature and all communications in connection with this Contract. shall be in the English language
Language
13
Work Breakdown Structure (WBS). Contractor shall each be responsible for the management, administration, coordination,. documentation, execution and control of the Work and provisional turnover of the facility to. Company including all final documentation. Company will review and monitor Contractor’s execution performa...
WBS
26
all relevant Performance Tests have been carried out in accordance with the Contract and. all Laws (including, without limitation, requirements relating to the environment), and either:. (a) the relevant Performance Guarantee is passed on the relevant terms provided for in. the Performance Test Procedure and Exhibit J;...
Quality Inspection
19
The Contractor shall provide such assistance and services in connection with the Performance. Tests as the Company may require in accordance with Exhibit J When providing such assistance. and services the Contractor shall co-operate and co-ordinate with the Process Licensor(s) as and to. the extent required by the Co...
Quality Inspection
19
Licensor Representatives during Detailed Engineering. EPC Contractor # shall be responsible to coordinate with Licensors for approval of documents. and drawings during detailed engineering Licensor participation in HAZOP and subsequent. reviews is required as specified in the Engineering Agreement with the Licensor If...
Detail Engineering
6
Category C action status:. These are HAZOP actions that shall be fully implemented by EPC Contractor. during detailed engineering There are altogether twenty one category C. HAZOP action items and each of these is assigned a DCN Action Ref Number. (ie from C- to C-) (See Attachment ). Table summarizes the status of EP...
Safety and Environmental Study
20
Environmental Impact Assessment (EIA). A copy of the Main NRP Environmental Impact Assessment (EIA) Reports as submitted to Kuwait. Environment Public Authority (KEPA) is located in this Exhibit A scope of work, under Appendix A. Other EIAs are provided in Appendix C of this Exhibit A Scope of Work The comments on the....
EIA
7
The workmanship of the Contractor's and Subcontractors' employees shall conform to Good. Engineering Practice, be otherwise in accordance with the Contract and be fit for the purposes set. out or reasonably to be inferred from the Contract The Contractor shall ensure that the Work shall. comply strictly with the provis...
SubContractor
24
The Contractor shall keep and cause its Subcontractors to keep, in accordance with generally. accepted accounting practices, books, records and accounts pertaining to performance of the. Work, including the Contractor’s and Subcontractor’s personnel records, correspondence,. instructions, plans, drawings, receipts, vou...
SubContractor
24
Terminate all Subcontracts, except those to be assigned or novated to the Company. pursuant to sub-Clauses or below;
SubContractor
24