{"id": "isc-te-00074-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Jordale plc", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "12 March 2026"}, "checklist": ["If the equipment is above the major purchase threshold, also include: tender waiver justification (signed)", "Equipment purchase request form (signed)", "Installation requirements note", "Cost-benefit justification", "Training needs assessment (signed)", "Grant fund eligibility note (signed, issued within the last 6 months)"], "submission": {"case": {"name": "equipment EZ-12088", "reference": "RL-72447"}, "documents received": ["Equipment purchase request form for equipment EZ-12088, dated 12 November 2025. 2 pages, complete. Signed by the requesting Department Head.", "Cost-benefit justification for equipment EZ-12088, dated 23 December 2025. 3 pages, complete.", "Installation requirements note for equipment EZ-12088, dated 8 February 2026. 2 pages, complete.", "Vendor quotation for equipment EZ-12088, dated 7 January 2026. 2 pages, complete.", "Training needs assessment for equipment EZ-12088, dated 13 November 2025. 1 page. Signed by the Training Manager.", "Grant fund eligibility note for equipment EZ-12088, dated 9 February 2026. 1 page. Signed by the Research Funding Officer.", "Tender waiver justification for equipment EZ-12088, dated 3 March 2026. 1 page. Signed by the Director of Procurement."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete: every applicable line is met (extra documents do not matter). Reply incomplete: at least one applicable line is not met. Reply unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-15", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 764}} {"id": "isc-te-00118-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Wynshaw Ltd", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "4 August 2026"}, "checklist": ["Witness list, signed.", "Investigator appointment letter, issued within the last 3 months.", "Evidence bundle index, signed.", "Adjustment request record, issued within the last 3 months, signed.", "Previous grievance outcome letter, issued within the last 24 months.", "Meeting invitation with rights explained, issued within the last 1 months."], "submission": {"case": {"name": "Sanne Ingson", "reference": "PI-43445"}, "cover note": "Everything needed is attached and complete, so the pack is ready for your review.", "documents received": ["Adjustment request record dated 16 July 2026 concerning Sanne Ingson. It is 1 page and is signed by the HR adviser.", "Investigator appointment letter dated 28 May 2026 concerning Sanne Ingson. It is 1 page.", "Previous grievance outcome letter dated 3 October 2024 concerning Sanne Ingson. Only pages 1-1 of 2 are included.", "Meeting invitation with rights explained dated 24 July 2026 concerning Sanne Ingson. It is 1 page.", "Evidence bundle index dated 11 June 2026 concerning Sanne Ingson. It is 2 pages, complete, and is signed by the case administrator.", "Grievance procedure acknowledgement dated 5 July 2026 concerning Sanne Ingson. It is 1 page and is signed by Sanne Ingson.", "Witness list dated 25 April 2026 concerning Sanne Ingson. It is 1 page and is signed by the investigating officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 770}} {"id": "isc-te-00488-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Dravwood & Co", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "22 May 2026"}, "checklist": ["Breach evidence log, issued within the last 1 month and signed", "Original service agreement copy", "Losses calculation statement, issued within the last 1 month and signed", "If the defaulting party is a public sector body, also: public sector termination approvals record, issued within the last 3 months and signed", "If the contract requires a dispute to go to mediation first, also: mediation request confirmation, issued within the last 1 month and signed", "Default notice previously served, issued within the last 6 months and signed"], "submission": {"case": {"name": "Bravberg SAS", "reference": "YW-54965", "details": ["The defaulting party is a public sector body.", "The contract allows termination without prior mediation."]}, "cover note": "Please find attached everything needed for this review; the pack is complete.", "documents received": ["Cure period expiry calculation for Bravberg SAS, dated 6 May 2026. 2 pages, complete. Signed by the dispute resolution analyst.", "Original service agreement copy relating to Bravberg SAS, dated 22 March 2026. Pages 1 to 8 are included; the total number of pages is not shown anywhere.", "Default notice previously served on Bravberg SAS, dated 21 December 2025. Single page. Signed by the contracts manager.", "Losses calculation statement for Bravberg SAS, dated 8 May 2026. 3 pages, complete. Signed by the finance manager.", "Termination notice draft for Bravberg SAS, dated 28 March 2026. 2 pages, complete. Signed by the senior legal counsel.", "Breach evidence log for Bravberg SAS, dated 13 May 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Public sector termination approvals record for Bravberg SAS, dated 28 March 2026. 2 pages, complete. Signed by the head of procurement."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 852}} {"id": "isc-te-00341-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Dundcombe Group", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "7 May 2026"}, "checklist": ["Cost-benefit justification is attached", "Equipment purchase request form is attached, signed", "Vendor quotation is attached, issued within the last 3 months", "Training needs assessment is attached, signed", "Maintenance plan is attached"], "submission": {"case": {"name": "equipment BU-49803", "reference": "HE-68114"}, "documents received": ["Equipment purchase request form for equipment BU-49803, dated 11 February 2026. 2 pages, complete. Signed by the requesting department head.", "Vendor quotation for equipment BU-49803, dated 21 April 2026. 2 pages, complete.", "File scan_00211.pdf. The scan is blank, so its contents cannot be seen.", "A budget spreadsheet for the whole department covering equipment BU-49803, dated 16 April 2026. 3 pages, complete.", "Training needs assessment for equipment BU-49803, dated 5 April 2026. A single page. Signed by the training coordinator.", "Maintenance plan for equipment BU-49803, dated 19 March 2026. 2 pages, complete.", "Cost-benefit justification for equipment BU-49803, dated 16 April 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 720}} {"id": "isc-te-00284-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Vaskridge plc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "7 May 2026"}, "checklist": ["Company tax registration certificate on file.", "Beneficial owner identification form on file, signed.", "Company statutes on file, signed.", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents.", "Proof of registered office address on file, issued within the last 3 months.", "Shareholder register extract on file, issued within the last 3 months."], "submission": {"case": {"name": "Wendshaw Limited", "reference": "ZW-66539", "details": ["The company has a non-resident beneficial owner."]}, "cover note": "Please review the pack for Wendshaw Limited, reference ZW-66539. I am not sure everything needed is included, so please check it against the requirements.", "documents received": ["company-statutes_wendshaw.pdf - Company statutes for Wendshaw Limited. Date of issue: 10 April 2026. 12 pages, complete. Signed by the company secretary.", "shareholder-register_wendshaw.pdf - Shareholder register extract for Wendshaw Limited. Date of issue: 14 March 2026. 2 pages, complete.", "apostilled-incorporation-docs_wendshaw.pdf - Apostilled incorporation documents for Wendshaw Limited. Date of issue: 24 April 2026. 4 pages, complete.", "certificate-of-incorporation_wendshaw.pdf - Certificate of incorporation for Wendshaw Limited. Date of issue: 26 January 2026. 1 page.", "bo-identification-form_wendshaw.pdf - Beneficial owner identification form for Wendshaw Limited. Date of issue: 19 March 2026. 3 pages, complete. Signed by the beneficial owner.", "registered-office-proof_wendshaw.pdf - Proof of registered office address for Wendshaw Limited. Date of issue: 25 March 2026. 1 page.", "tax-reg-cert_wendshaw.pdf - Company tax registration certificate for Wendshaw Limited. Date of issue: 23 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 863}} {"id": "isc-te-00433-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Yselburg Partners", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "1 April 2026"}, "checklist": ["Confirm the cost-benefit justification is included.", "Confirm the installation requirements note is included.", "Confirm the vendor quotation is included, issued within the last 3 months.", "Confirm the maintenance plan is included."], "submission": {"case": {"name": "equipment FH-21730", "reference": "QM-98274"}, "documents received": ["grant fund eligibility note FH-21730.pdf — A single-page grant fund eligibility note for equipment FH-21730, dated 12 December 2025. It is signed by the grants officer.", "installation requirements note FH-21730.pdf — An installation requirements note for equipment FH-21730, dated 17 February 2026. 2 pages, complete.", "vendor quotation FH-21730.pdf — A vendor quotation for equipment FH-21730, dated 5 February 2026. 2 pages, complete.", "training needs assessment FH-21730.pdf — A single-page training needs assessment for equipment FH-21730, dated 15 March 2026. It is signed by the department training coordinator.", "cost-benefit justification FH-21730.pdf — A cost-benefit justification for equipment FH-21730, dated 21 December 2025. 3 pages, complete.", "maintenance plan FH-21730.pdf — A maintenance plan for equipment FH-21730, dated 7 March 2026. Page 1 is included, and the total number of pages is not shown anywhere on it."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Go through all checklist lines that apply to this case. To count, a required document must be the kind of document listed rather than a similar one, must be about the subject of the case, must have all its pages, must be signed wherever the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-62", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 794}} {"id": "isc-te-00190-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ovarcourt GmbH", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "20 March 2026"}, "checklist": ["Mortgage application form, signed", "Sale and purchase agreement, signed", "Proof of deposit issued within the last 3 months", "Photo identity document valid (not expired) on the date of the review", "Credit bureau report issued within the last 1 months", "Employment certificate issued within the last 1 months, signed"], "submission": {"case": {"name": "property YQ-74246", "reference": "EC-84723"}, "cover note": "I am sorry that this pack was put together in a rush. Kind regards, Carmen Rookisey", "documents received": ["sale-and-purchase-agreement-YQ-74246.pdf — Sale and purchase agreement for property YQ-74246. It shows a date of issue of 6 March 2026. It is 9 pages, complete, and is signed by the buyer and the seller.", "proof-of-deposit-YQ-74246.pdf — Proof of deposit for property YQ-74246. It shows a date of issue of 8 January 2026. It is 1 page.", "mortgage-application-form-YQ-74246.pdf — Mortgage application form for property YQ-74246. It shows a date of issue of 7 December 2025. It is 6 pages, complete, and is signed by the applicant.", "photo-identity-document-YQ-74246.pdf — Photo identity document for property YQ-74246. It shows an expiry date of 8 November 2026. It is 1 page.", "employment-certificate-YQ-74246.pdf — Employment certificate for property YQ-74246. It shows a date of issue of 14 March 2026. It is 1 page and is signed by the employer.", "credit-bureau-report-YQ-74246.pdf — Credit bureau report for property YQ-74246. It shows a date of issue of 10 March 2026. It is 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 887}} {"id": "isc-te-00436-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Ivrlund SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "6 March 2026"}, "checklist": ["Confirm that the points transfer request is present and signed", "Confirm that the identity verification document is present and valid, that is not expired, on the date of the review", "Confirm that the nominated store preference form is present and signed", "Confirm that the customer contact details sheet is present and signed", "Confirm that the terms and conditions acceptance sheet is present and signed", "Confirm that the marketing consent form is present and signed"], "submission": {"case": {"name": "Brooke Cormworth", "reference": "YP-76900"}, "documents received": ["Single-page identity verification document concerning Brooke Cormworth, showing an expiry date of 2 May 2026.", "Single-page marketing consent form dated 28 January 2026, concerning Brooke Cormworth. The form is signed by the member.", "Single-page nominated store preference form dated 26 February 2026, concerning Brooke Cormworth. The form is signed by the member.", "Single-page customer contact details sheet dated 27 January 2026, concerning Brooke Cormworth. The sheet is signed by the member.", "Single-page newsletter subscription confirmation for a different shop, dated 28 January 2026, concerning Brooke Cormworth. The confirmation is signed by the member.", "Single-page points transfer request dated 9 February 2026, concerning Brooke Cormworth. The request carries the signature of the transferring member.", "Single-page terms and conditions acceptance sheet dated 30 November 2025, concerning Brooke Cormworth. The sheet is signed by the member."]}}, "question": {"type": "choice", "instructions": "The task is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-51", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 768}} {"id": "isc-te-00317-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Brenwyn Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "20 August 2026"}, "checklist": ["Obtain a financial stability statement, issued within the last 12 months and signed.", "Obtain a raw material certificate of analysis, issued within the last 6 months and signed.", "Obtain a supplier self-assessment report, issued within the last 12 months and signed.", "Obtain a supplier audit report, issued within the last 24 months and signed.", "Obtain a supplier capacity declaration, issued within the last 12 months and signed.", "Obtain a supplier quality questionnaire, issued within the last 12 months and signed."], "submission": {"case": {"name": "Haskbury BV", "reference": "CB-19498"}, "documents received": ["Haskbury_BV_Financial_Stability_Statement.pdf - Financial stability statement for Haskbury BV, dated 21 May 2026. 2 pages, complete. Signed by the chief financial officer of Haskbury BV.", "Haskbury_BV_Supplier_Audit_Report_Undated.pdf - Supplier audit report for Haskbury BV. The issue date is covered by a stamp and cannot be seen. 8 pages, complete. Signed by the lead auditor.", "Haskbury_BV_Self_Assessment_Report.pdf - Supplier self-assessment report for Haskbury BV, dated 3 August 2026. 6 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Raw_Material_CoA.pdf - Raw material certificate of analysis for Haskbury BV, dated 8 April 2026. 2 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Quality_Questionnaire.pdf - Supplier quality questionnaire for Haskbury BV, dated 2 October 2025. 4 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Capacity_Declaration.pdf - Supplier capacity declaration for Haskbury BV, dated 18 September 2025. 2 pages, complete. Signed by the supplier's operations director.", "Haskbury_BV_QMS_Certificate.pdf - Certified quality management system certificate for Haskbury BV, expiring 29 June 2028. Single page."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 710}} {"id": "isc-te-00280-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Yarvham Limited", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "4 May 2026"}, "checklist": ["Board resolution to open the account, signed", "Company tax registration certificate", "Proof of registered office address, issued within the last 3 months", "If the company operates in a cash-intensive trade, also: cash handling policy, signed", "Authorised signer identity document, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Lombham Partners", "reference": "JE-39716", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["A scanned cash handling policy for Lombham Partners, dated 31 March 2026. It is 2 pages, complete, and signed by the managing director.", "A scanned authorised signer identity document for Lombham Partners, with an expiry date of 15 August 2028. It is 1 page.", "A scanned proof of registered office address for Lombham Partners, issued on 15 April 2026. It is 1 page.", "A scanned company tax registration certificate for Lombham Partners, issued on 6 January 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 661}} {"id": "isc-te-00269-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Quorton BV", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "9 April 2026"}, "checklist": ["Check that the vehicle condition report is signed.", "Check that the passport is valid (not expired) on the date of the review and signed.", "Check that the fuel policy sheet is signed.", "Check that the insurance excess waiver certificate is valid (not expired) on the date of the review.", "If the named driver is under 25 years old, also check the young driver surcharge agreement is signed."], "submission": {"case": {"name": "Sabine Vintwell", "reference": "QB-43148", "details": ["The named driver is 25 or older."]}, "cover note": "I am sending the pack for Sabine Vintwell, reference QB-43148. I am not sure everything needed is there.", "documents received": ["insurance_excess_waiver_certificate.pdf — An insurance excess waiver certificate for Sabine Vintwell with the expiry date 2 March 2027. 2 pages, complete.", "booking_voucher.pdf — A booking voucher for Sabine Vintwell, dated 2 February 2026. It is a single page.", "fuel_policy_sheet.pdf — A fuel policy sheet for Sabine Vintwell, dated 7 February 2026. It is a single page. It is signed by the named driver.", "document.pdf — The file will not open, so its contents cannot be seen.", "vehicle_condition_report.pdf — A vehicle condition report for Sabine Vintwell, dated 6 January 2026. 2 pages, complete. It is signed by the rental branch counter staff member who inspected the car.", "passport.pdf — A passport for Sabine Vintwell with the expiry date 19 April 2027. It is a single page. It is signed by the passport holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00210-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jundstead BV", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "20 April 2026"}, "checklist": ["Production downtime log - confirm it was issued within the last 3 months and is signed", "Purchase invoice for the machine", "Repair or replacement quotation - confirm it was issued within the last 3 months", "Equipment breakdown claim form - confirm it is signed"], "submission": {"case": {"name": "failed machine BH-86750", "reference": "XI-70320"}, "documents received": ["Equipment breakdown claim form for failed machine BH-86750. Date of issue: 30 January 2026. 3 pages, complete. Signed by the policyholder.", "Repair or replacement quotation for failed machine BH-86750. Date of issue: 5 March 2026. 2 pages, complete.", "Production downtime log for failed machine BH-86750. Date of issue: 6 February 2026. 2 pages, complete. Signed by the production supervisor.", "Purchase invoice for the machine, for failed machine BH-86750. Date of issue: 11 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Judge the pack against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-36", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 658}} {"id": "isc-te-00042-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Cindburg Group", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "16 March 2026"}, "checklist": ["Outbound loading record, issued within the last 1 months, signed", "Seal number log, issued within the last 1 months, signed", "Load consolidation sheet, issued within the last 3 months, signed", "Transfer manifest, signed", "Inbound unloading record, issued within the last 1 months, signed", "Damaged goods exception sheet, issued within the last 1 months, signed"], "submission": {"case": {"name": "cross-dock transfer BE-71642", "reference": "UP-20974"}, "documents received": ["Transfer manifest for cross-dock transfer BE-71642, dated 20 November 2025. 3 pages, complete. Signed by the transport planner.", "Cross-dock slot booking sheet for cross-dock transfer BE-71642, dated 5 March 2026. Single page. Signed by the dock scheduler.", "Damaged goods exception sheet for cross-dock transfer BE-71642, dated 14 March 2026. Single page. Signed by the inbound unloading supervisor.", "Seal number log for cross-dock transfer BE-71642, dated 8 March 2026. Single page. Signed by the outbound loading supervisor.", "Outbound loading record for cross-dock transfer BE-71642, dated 27 February 2026. Single page. Signed by the outbound loading supervisor.", "Inbound unloading record for cross-dock transfer BE-71642, dated 5 March 2026. Single page. Signed by the inbound unloading supervisor.", "Load consolidation sheet for cross-dock transfer BE-71642. The date of issue is obscured by a stamp. 2 pages, complete. Signed by the load consolidation supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 817}} {"id": "isc-te-00420-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ebrfield plc", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "10 September 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed", "Anti-bribery policy statement, signed", "Supplier declaration of no conflicts of interest, signed", "Certificate of incorporation", "Supplier registration form, signed"], "submission": {"case": {"name": "Maldcrest Partners", "reference": "LF-56948", "details": ["The supplier is a foreign company."]}, "documents received": ["Certificate of incorporation - Maldcrest Partners.pdf\nA certificate of incorporation for Maldcrest Partners, dated 19 May 2026. It is 2 pages, complete.", "Supplier registration form - Maldcrest Partners.pdf\nA supplier registration form for Maldcrest Partners, dated 3 June 2026. It is 3 pages, complete, and signed by a director of Maldcrest Partners.", "Bank details confirmation letter - Maldcrest Partners.pdf\nA single-page bank details confirmation letter for Maldcrest Partners, dated 14 August 2026. It is signed by a bank officer.", "Certified translation of the certificate of incorporation - Maldcrest Partners.pdf\nA certified translation of the certificate of incorporation for Maldcrest Partners, dated 12 August 2026. It is 2 pages, complete, and signed by a certified translator.", "Supplier declaration of no conflicts of interest - Maldcrest Partners.pdf\nA single-page supplier declaration of no conflicts of interest for Maldcrest Partners, dated 4 July 2026. It is signed by a director of Maldcrest Partners.", "General terms and conditions - Maldcrest Partners.pdf\nA signed copy of the general terms and conditions for Maldcrest Partners, dated 7 July 2026. It is 6 pages, complete, and signed by a director of Maldcrest Partners."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack fulfils the checklist. Examine every checklist line that applies to this case. For a required document to count, it must be the kind listed (not a similar kind), be about the case's subject, have all its pages, be signed wherever the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line fails. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-11", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 816}} {"id": "isc-te-00323-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Bravbury plc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "20 March 2026"}, "checklist": ["Confirm the pack contains the brand colour specification", "Confirm the pack contains the waste disposal plan", "Confirm the pack contains the kit contents list", "Confirm the pack contains a signed point of sale design proof"], "submission": {"case": {"name": "merchandising kit TQ-71056", "reference": "ZM-22416"}, "documents received": ["A kit contents list for merchandising kit TQ-71056, dated 14 December 2025. 2 pages, complete.", "A brand colour specification for merchandising kit TQ-71056, dated 27 December 2025. It is a single page.", "A waste disposal plan for merchandising kit TQ-71056, dated 4 December 2025. It is a single page.", "A point of sale design proof for merchandising kit TQ-71056, dated 29 December 2025. 4 pages, complete. The signature line is empty, so the document is not signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 662}} {"id": "isc-te-00111-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Orrham & Co", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "12 June 2026"}, "checklist": ["Risk assessment for the task: issued within the last 3 months and signed.", "Job request form: signed.", "Access authorisation slip: signed.", "Planned completion date sheet: signed.", "Cost estimate: issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request HG-58912", "reference": "AR-31853"}, "cover note": "Everything needed for this pack is attached and complete. Please review and pass it on to the trade team when you can.", "documents received": ["Job request form HG-58912.pdf — Job request form for maintenance request HG-58912, dated 28 April 2026. Single page. Signed by the requesting manager.", "Risk assessment HG-58912.pdf — Risk assessment for the task under maintenance request HG-58912, dated 12 May 2026. 5 pages, complete. Signed by the health and safety officer.", "Planned completion date sheet HG-58912.pdf — Planned completion date sheet for maintenance request HG-58912, dated 9 April 2026. Single page. Signed by the facilities coordinator.", "Cost estimate HG-58912.pdf — Cost estimate for maintenance request HG-58912, dated 2 April 2026. 2 pages, complete. Signed by the estimating supervisor.", "Visitor pass 9 April 2026.pdf — Visitor pass from a previous visit connected to maintenance request HG-58912, dated 9 April 2026. Single page. Signed by the visitor who used it."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00153-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jorwell Partners", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "22 May 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Travel request form (signed)", "Passport copy for international travel (valid (not expired) on the date of the review)", "Flight itinerary quote (issued within the last 1 months)", "Visa entry requirement printout (issued within the last 3 months)", "Trip cost estimate (signed)", "Travel policy acknowledgement (signed)"], "submission": {"case": {"name": "business trip SC-57627", "reference": "VR-75039", "details": ["The traveller is not a passport holder of the destination country."]}, "documents received": ["Hotel booking confirmation for business trip SC-57627. Dated 30 March 2026. 2 pages, complete.", "Trip cost estimate for business trip SC-57627. Dated 10 April 2026. Single page. Signed by the line manager.", "Visa entry requirement printout for business trip SC-57627. Dated 15 May 2026. Pages 1 to 1 included; the total number of pages is not shown anywhere.", "Passport copy for international travel for business trip SC-57627. Passport expiry date: 22 November 2027. Single page.", "Work permit confirmation for business trip SC-57627. Dated 30 April 2026. 2 pages, complete.", "Flight itinerary quote for business trip SC-57627. Dated 18 May 2026. 2 pages, complete.", "Travel policy acknowledgement for business trip SC-57627. Dated 2 February 2026. Single page. Signed by the traveller.", "Travel request form for business trip SC-57627. Dated 3 April 2026. 2 pages, complete. Signed by the traveller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 849}} {"id": "isc-te-00157-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Morvholm SAS", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "6 March 2026"}, "checklist": ["Financial assessment form, signed.", "If the adult owns property that could be considered in the financial assessment, also: property valuation report, issued within the last 12 months and signed.", "Benefit entitlement letters, issued within the last 12 months.", "Capacity assessment record, signed.", "Proof of identity, valid (not expired) on the date of the review.", "Support plan, signed."], "submission": {"case": {"name": "Dimitris Yellani", "reference": "RL-43050", "details": ["The adult owns property that could be considered in the financial assessment."]}, "documents received": ["Proof of identity - Dimitris Yellani.pdf. Single-page proof of identity for Dimitris Yellani, showing an expiry date of 24 March 2026.", "Needs assessment report - Dimitris Yellani.pdf. Needs assessment report for Dimitris Yellani, dated 7 January 2026. 12 pages, complete. Signed by the assessing social worker.", "Property valuation report - Dimitris Yellani.pdf. Property valuation report for Dimitris Yellani, dated 7 August 2025. 2 pages, complete. Signed by the valuer.", "Benefit entitlement letters - Dimitris Yellani.pdf. Benefit entitlement letters for Dimitris Yellani, dated 2 August 2025. 2 pages, complete.", "Capacity assessment record - Dimitris Yellani.pdf. Capacity assessment record for Dimitris Yellani, dated 23 November 2025. 4 pages, complete. Signed by the assessor.", "Support plan - Dimitris Yellani.pdf. Support plan for Dimitris Yellani, dated 27 January 2026. 6 pages, complete. Signed by the support planner.", "Financial assessment form - Dimitris Yellani.pdf. Financial assessment form for Dimitris Yellani, dated 31 January 2026. 6 pages, complete. Signed by the adult.", "Safeguarding referral form - Dimitris Yellani.pdf. Safeguarding referral form for Dimitris Yellani, dated 21 December 2025. 2 pages, complete. Signed by the referring officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 908}} {"id": "isc-te-00130-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Halvness LLP", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "22 April 2026"}, "checklist": ["Trade references letter, issued within the last 3 months, signed", "Company registration certificate", "Bank reference letter, issued within the last 6 months, signed", "Personal guarantee, signed"], "submission": {"case": {"name": "Pravmark GmbH", "reference": "EM-15224"}, "documents received": ["Credit reference agency report for Pravmark GmbH, dated 10 April 2026. 6 pages, complete.", "Trade references letter for Pravmark GmbH, dated 15 February 2026. 1 page. Signed by the referee's accounts manager.", "Bank reference letter for Pravmark GmbH, dated 24 December 2025. 1 page. Signed by the bank's relationship manager.", "Company registration certificate for Pravmark GmbH, dated 5 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 605}} {"id": "isc-te-00443-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Yondfield Group", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "16 April 2026"}, "checklist": ["Problem statement page", "Cost estimate sheet issued within the last 6 months", "Capacity and load estimate issued within the last 6 months", "Alternatives considered table"], "submission": {"case": {"name": "design document ZP-11113", "reference": "XV-29298"}, "documents received": ["Capacity and load estimate for design document ZP-11113, dated 19 February 2026. 3 pages, complete.", "Problem statement page for design document ZP-11113, dated 6 March 2026. 2 pages, complete.", "Review board feedback summary for design document ZP-11113, dated 2 March 2026. 2 pages, complete. Signed by the review board chair.", "Cost estimate sheet for design document ZP-11113, dated 6 March 2026. 2 pages, complete.", "Alternatives considered table for design document ZP-11113, dated 16 February 2026. Pages 1-1 of 2 are included."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 667}} {"id": "isc-te-00073-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Oskbrook Inc", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 March 2026"}, "checklist": ["External advisory board minutes, issued within the last 12 months, signed.", "Annual activity report, issued within the last 6 months, signed.", "Doctoral researcher progress summary, issued within the last 6 months, signed.", "Director's declaration of interests, issued within the last 12 months, signed."], "submission": {"case": {"name": "Dravhaven & Co", "reference": "AO-71168"}, "documents received": ["AO-71168_intellectual_property_register_extract_2026-01-29.pdf — Intellectual property register extract for Dravhaven & Co, dated 29 January 2026. Single page. Signed by the institute director.", "AO-71168_annual_activity_report_2026-01-08.pdf — Annual activity report for Dravhaven & Co, dated 8 January 2026. 12 pages, complete. Signed by the institute director.", "AO-71168_directors_declaration_of_interests_2025-04-16.pdf — Director's declaration of interests for Dravhaven & Co, dated 16 April 2025. Single page. Signed by the institute director.", "AO-71168_doctoral_researcher_progress_summary_2025-10-03_v4.pdf — Doctoral researcher progress summary for Dravhaven & Co, dated 3 October 2025. 2 pages, complete. Signed by the institute director.", "AO-71168_external_advisory_board_minutes_2025-08-18.pdf — External advisory board minutes for Dravhaven & Co, dated 18 August 2025. 4 pages, complete. Signed by the chair of the external advisory board."]}}, "question": {"type": "choice", "instructions": "Your task is to determine whether the pack is complete when measured against the checklist. Go over every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. The answer is complete: every applicable line is met (extra documents do not matter). The answer is incomplete: at least one applicable line is not met. The answer is unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, as they may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-16", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 852}} {"id": "isc-te-00200-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Nordlock Limited", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "6 March 2026"}, "checklist": ["Furniture inventory list, issued within the last 1 months, signed", "Crate hire agreement, signed", "IT decommissioning certificate, issued within the last 1 months, signed", "Movers insurance certificate, valid (not expired) on the date of the review", "New floor snagging list, issued within the last 1 months, signed", "Signed move plan, signed"], "submission": {"case": {"name": "office move project NC-41124", "reference": "TC-49720"}, "documents received": ["Signed move plan for office move project NC-41124. Date of issue: 25 November 2025. 6 pages, complete. Signed by the project manager.", "Movers insurance certificate for office move project NC-41124. Expiry date: 14 December 2027. 1 page.", "Furniture inventory list for office move project NC-41124. Date of issue: 16 February 2026. 4 pages, complete. Signed by the facilities manager.", "New floor snagging list for office move project NC-41124. Date of issue: 24 February 2026. 3 pages, complete. Signed by the building surveyor.", "IT decommissioning certificate for office move project NC-41124. Date of issue: 24 February 2026. 1 page. Signed by the IT services lead.", "Crate hire agreement for office move project NC-41124. Date of issue: 4 February 2026. 2 pages, complete. Signed by the crate hire supplier's representative."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Work through every checklist line that applies to this case one by one. For a required document to count, it must be the exact kind of document listed (not a similar one), be about the subject of the case, contain all its pages, be signed where the checklist asks for a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line only applies when its circumstance holds for the case. complete: all applicable lines are met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-68", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00360-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Aldmoor & Co", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "29 May 2026"}, "checklist": ["If the server will be sold or donated rather than destroyed, also: disposal vendor certificate of destruction (issued within the last 3 months, signed)", "network disconnection confirmation (issued within the last 1 months, signed)", "data migration confirmation (issued within the last 3 months, signed)", "final backup confirmation (issued within the last 3 months, signed)", "licence reassignment note (issued within the last 3 months, signed)", "If the server holds archived records that must be kept, also: archive retention confirmation (issued within the last 3 months, signed)", "decommission request form (signed)", "dependent systems check report (issued within the last 3 months)"], "submission": {"case": {"name": "retired server LZ-34741", "reference": "SX-62950", "details": ["The server will be sold or donated rather than destroyed.", "The server holds no records with retention requirements."]}, "cover note": "Please accept my apologies that this pack was put together in a rush.", "documents received": ["Decommission-request-form_LZ-34741.pdf. Decommission request form for retired server LZ-34741, issued 21 March 2026. 2 pages, complete, signed by the requesting team's system owner.", "Network-disconnection-confirmation_LZ-34741.pdf. Network disconnection confirmation for retired server LZ-34741, issued 19 May 2026. A single page, signed by the network operations engineer.", "Licence-reassignment-note_LZ-34741.pdf. Licence reassignment note for retired server LZ-34741, issued 25 May 2026. A single page, signed by the licensing coordinator.", "Disposal-vendor-certificate-of-destruction_LZ-34741.pdf. Certificate of destruction for retired server LZ-34741, issued 17 April 2026. A single page, signed by the disposal vendor's operations manager.", "Dependent-systems-check-report_LZ-34741.pdf. Dependent systems check report for retired server LZ-34741, issued 15 March 2026. 3 pages, complete.", "Final-backup-confirmation_LZ-34741.pdf. Final backup confirmation for retired server LZ-34741, issued 15 March 2026. A single page, signed by the backup administrator.", "Asset-register-update_LZ-34741.pdf. Asset register update for retired server LZ-34741, issued 20 May 2026. A single page.", "Data-migration-confirmation_LZ-34741.pdf. Data migration confirmation for retired server LZ-34741, issued 17 April 2026. 2 pages, complete, signed by the data migration lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1065}} {"id": "isc-te-00116-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Dornfell Group", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "11 September 2026"}, "checklist": ["Meeting invitation with rights explained, issued within the last 1 months", "Investigator appointment letter, issued within the last 3 months", "Written grievance statement, signed", "Evidence bundle index, signed", "Adjustment request record, issued within the last 3 months, signed", "Previous grievance outcome letter, issued within the last 24 months", "Only if this applies: if the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed"], "submission": {"case": {"name": "Antoine Ingstow", "reference": "SD-74482", "details": ["The grievance makes no allegation of bullying."]}, "cover note": "Hello, could you approve this quickly? All the paperwork is in order. Kind regards, Lukas Pimard", "documents received": ["Meeting invitation with rights explained. The invitation concerns Antoine Ingstow. It shows its date of issue as 3 September 2026. It is a single page.", "Written grievance statement. The statement concerns Antoine Ingstow. It shows its date of issue as 4 July 2026. It is signed by Antoine Ingstow. 3 pages, complete.", "Previous grievance outcome letter. The letter concerns Antoine Ingstow. It shows its date of issue as 14 March 2026. 2 pages, complete.", "Random pile of undated emails. It concerns Antoine Ingstow. It shows its date of issue as 3 June 2026. 2 pages, complete. It is signed by the case handler.", "Adjustment request record. The record concerns Antoine Ingstow. It shows its date of issue as 12 August 2024. It is a single page. It is signed by the employee relations adviser.", "Investigator appointment letter. The letter concerns Antoine Ingstow. It shows its date of issue as 31 July 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Your task is to judge the pack against the checklist. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Say complete if every applicable line is met (extra documents do not matter). Say incomplete if at least one applicable line is not met. Say unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-24", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 852}} {"id": "isc-te-00202-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Hondstow BV", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "7 July 2026"}, "checklist": ["New floor snagging list, issued within the last 1 month and signed", "Lifting equipment inspection report, issued within the last 6 months and signed", "Furniture inventory list, issued within the last 1 month and signed", "Crate hire agreement, signed"], "submission": {"case": {"name": "office move project NU-22840", "reference": "HJ-76078"}, "documents received": ["Furniture inventory list for office move project NU-22840, dated 28 May 2026. 4 pages, complete. Signed by the facilities coordinator.", "Movers insurance certificate for office move project NU-22840, with an expiry date of 23 October 2028. 1 page.", "Crate hire agreement for office move project NU-22840, dated 15 May 2026. 2 pages, complete. Signed by the crate hire supplier's representative.", "New floor snagging list for office move project NU-22840, dated 25 June 2026. 3 pages, complete. Signed by the site manager.", "Lifting equipment inspection report for office move project NU-22840, dated 21 May 2026. 2 pages, complete. Signed by the inspection engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 716}} {"id": "isc-te-00114-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Yarvwell GmbH", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "22 June 2026"}, "checklist": ["Confirm the pack contains a planned completion date sheet, signed.", "If the job involves working at height above two metres, also confirm the pack contains a permit to work at height, issued within the last 1 months and signed.", "Confirm the pack contains a parts order confirmation, issued within the last 1 months.", "Confirm the pack contains a risk assessment for the task, issued within the last 3 months and signed.", "Confirm the pack contains a location details sheet.", "Confirm the pack contains photographs of the fault, issued within the last 3 months."], "submission": {"case": {"name": "maintenance request XG-95176", "reference": "VZ-64645", "details": ["The job involves working at height above two metres."]}, "cover note": "Reference VZ-64645: all the paperwork for this one is in order, so could you approve it as quickly as possible today? Lucia Tadini", "documents received": ["Location details sheet for maintenance request XG-95176, dated 31 May 2026. 1 page.", "Planned completion date sheet for maintenance request XG-95176, dated 4 March 2026. 1 page, signed by the facilities helpdesk supervisor.", "Parts order confirmation for maintenance request XG-95176, dated 4 June 2026. 1 page.", "Risk assessment for the task for maintenance request XG-95176, dated 17 April 2026. 5 pages, complete, signed by the assessing supervisor.", "Photographs of the fault for maintenance request XG-95176, dated 24 May 2026. 2 pages, complete.", "Job request form for maintenance request XG-95176, dated 29 May 2026. 1 page, signed by the requesting manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00479-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Oxlwater Partners", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "27 March 2026"}, "checklist": ["Current working pattern statement, issued within the last 3 months.", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed.", "Proposed working pattern plan, signed.", "Line manager opinion note, issued within the last 2 months, signed.", "Client or service impact statement, signed.", "Impact assessment on the team, signed.", "Trial period proposal, signed."], "submission": {"case": {"name": "Rory Ustins", "reference": "JA-54555", "details": ["The employee has caring responsibilities for a dependent."]}, "cover note": "This pack has already been checked by a colleague, so it should be ready for review. Please let me know if anything else is needed.", "documents received": ["Current working pattern statement - Rory Ustins.pdf. This is a current working pattern statement about Rory Ustins, showing its date of issue as 6 March 2026. It is a single page.", "Line manager opinion note - Rory Ustins.pdf. This is a line manager opinion note about Rory Ustins, showing its date of issue as 10 February 2026. It runs to 2 pages, complete, and is signed by the line manager.", "Proposed working pattern plan - Rory Ustins.pdf. This is a proposed working pattern plan about Rory Ustins, showing its date of issue as 4 February 2026. It runs to 2 pages, complete, and is signed by the employee.", "Flexible working request form - Rory Ustins.pdf. This is a flexible working request form about Rory Ustins, showing its date of issue as 15 March 2026. It runs to 3 pages, complete, and is signed by the employee.", "Client or service impact statement - Rory Ustins.pdf. This is a client or service impact statement about Rory Ustins, showing its date of issue as 7 January 2026. It is a single page, signed by the line manager.", "Trial period proposal - Rory Ustins.pdf. This is a trial period proposal about Rory Ustins, showing its date of issue as 18 March 2026. It is a single page, signed by the line manager.", "Previous flexible working requests record - Rory Ustins.pdf. This is a previous flexible working requests record about Rory Ustins, showing its date of issue as 6 July 2025. It is a single page.", "Impact assessment on the team - Rory Ustins.pdf. This is an impact assessment on the team about Rory Ustins, showing its date of issue as 27 December 2025. It runs to 3 pages, complete, and is signed by the line manager."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 821}} {"id": "isc-te-00483-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Maldwater plc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "9 June 2026"}, "checklist": ["Signed witness statement from a staff member", "Incident report from the day, issued within the last 3 months and signed", "Staff training record for the duty manager, issued within the last 24 months and signed", "CCTV footage stills of the incident, issued within the last 3 months", "Signed liability claim form", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed", "Photographs of the spillage on the floor, issued within the last 1 months", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed"], "submission": {"case": {"name": "Varnlund GmbH", "reference": "JH-79417", "details": ["The customer is handling the claim personally.", "The injured customer did not go to hospital."]}, "documents received": ["Liability claim form - Varnwarf.pdf. A claim form about Varnlund GmbH, dated 13 May 2026, 3 pages, complete. It is signed by the injured customer.", "Cleaning log for the day of the incident - Varnlund GmbH.pdf. A single-page cleaning log for the day of the incident at Varnlund GmbH, dated 6 April 2026. It is signed by the cleaner on duty.", "Incident report from the day - Varnlund GmbH.pdf. An incident report about Varnlund GmbH, dated 10 May 2026, 2 pages, complete. It is signed by the duty manager.", "CCTV footage stills of the incident - Varnlund GmbH.pdf. Stills of the incident at Varnlund GmbH, dated 27 March 2026, 2 pages, complete.", "Witness statement from a staff member - Varnlund GmbH.pdf. A single-page statement about Varnlund GmbH, dated 27 May 2026. It is signed by the staff member who witnessed the incident.", "Photographs of the spillage on the floor - Varnlund GmbH.pdf. A single page of photographs of the spillage on the floor at Varnlund GmbH, dated 1 June 2026.", "Staff training record for the duty manager - Varnlund GmbH.pdf. A training record for the duty manager at Varnlund GmbH, dated 29 March 2026, 2 pages, complete. It is signed by the store manager."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "partial", "defect": "signed", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 774}} {"id": "isc-te-00022-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Orrham & Co", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "26 March 2026"}, "checklist": ["Cost estimate, issued within the last 3 months and signed.", "Planned completion date sheet, signed.", "Parts order confirmation, issued within the last 1 months.", "Photographs of the fault, issued within the last 3 months.", "If the job involves working at height above two metres, also: permit to work at height, issued within the last 1 months and signed.", "Risk assessment for the task, issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request GA-62900", "reference": "IH-29832", "details": ["The job involves no work at height above two metres."]}, "documents received": ["parts-order-confirmation-GA-62900.pdf - Parts order confirmation for maintenance request GA-62900, issued 9 March 2026. Single page.", "cost-estimate-GA-62900.pdf - Cost estimate for maintenance request GA-62900. The date of issue is smudged and cannot be read. 2 pages, complete. Signed by the estimator.", "photographs-of-the-fault-GA-62900.pdf - Photographs of the fault for maintenance request GA-62900, issued 2 February 2026. 2 pages, complete.", "risk-assessment-for-the-task-GA-62900.pdf - Risk assessment for the task for maintenance request GA-62900, issued 18 March 2026. 5 pages, complete. Signed by the assessor.", "planned-completion-date-sheet-GA-62900.pdf - Planned completion date sheet for maintenance request GA-62900, issued 12 February 2026. Single page. Signed by the job planner.", "job-request-form-GA-62900.pdf - Job request form for maintenance GA-62900, issued 12 January 2026. Single page. Signed by the requester."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? That is the question to answer. Work through all checklist lines that bear on this case. For a required document to be counted, it must be the kind of document listed on the checklist (a similar document will not suffice), it must be about the case's subject, it must have all its pages present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued inside the period the checklist allows. A conditional line applies only when the circumstance it sets out holds for the case. complete: every applicable line is met, and extra documents are irrelevant. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one line cannot be decided from what is shown, for example when a needed date, signature or page count is not visible, when a document's kind cannot be told, or when the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-54", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 898}} {"id": "isc-te-00093-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Gravwick Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "25 May 2026"}, "checklist": ["Proposed rule change specification, signed", "Peer review checklist, issued within the last 1 month, signed", "Firewall change request form, signed", "Rollback plan, signed", "Business justification memo, issued within the last 3 months, signed", "Post-change test plan, signed"], "submission": {"case": {"name": "firewall change SF-45426", "reference": "IO-20304"}, "cover note": "Hi, sending over the pack for SF-45426. I'm not sure everything needed is in here, so please take a look. Jonas Arnaker", "documents received": ["SF-45426_firewall_change_request_form_v2.pdf. A firewall change request form for firewall change SF-45426, dated 24 February 2026. 3 pages, complete. It is signed by the requesting system administrator.", "SF-45426_rollback_plan.pdf. A rollback plan for firewall change SF-45426, dated 21 April 2026. 2 pages, complete. It is signed by the operations shift lead.", "SF-45426_peer_review_checklist.pdf. A peer review checklist for firewall change SF-45426, dated 8 May 2026. It is a single page and is signed by the reviewing network engineer.", "SF-45426_business_justification_memo.pdf. A business justification memo for firewall change SF-45426, dated 24 April 2026. It is a single page and is signed by the application owner.", "SF-45426_post_change_test_plan.pdf. A firewall change request form... wait, correct: A post-change test plan for firewall change SF-45426, dated 1 February 2026. 2 pages, complete. It is signed by the test coordinator.", "SF-45426_proposed_rule_change_specification.pdf. A proposed rule change specification for firewall change SF-45426, dated 3 March 2026. 2 pages, complete. It is signed by the lead network engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 898}} {"id": "isc-te-00086-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zervcourt plc", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "3 June 2026"}, "checklist": ["Check the passport: it must be valid, meaning not expired, on 3 June 2026, and it must be signed.", "Check the vehicle condition report: it must be signed.", "Check the booking voucher: it must have been issued within the last 6 months.", "Check the credit card in the driver's name: it must be valid, meaning not expired, on 3 June 2026, and it must be signed."], "submission": {"case": {"name": "Sanne Plumard", "reference": "MC-25332"}, "documents received": ["Passport - Sanne Plumard.jpg - Passport belonging to Sanne Plumard. It shows an expiry date of 24 November 2026. It is a single page, signed by the passport holder.", "Credit card - Sanne Plumard.jpg - Credit card in the driver's name for Sanne Plumard. It shows an expiry date of 22 October 2027. It is a single page, signed by the cardholder.", "Price comparison screenshot - Sanne Plumard.png - Price comparison screenshot from a search website for Sanne Plumard. It shows a date of issue of 31 March 2026. It is a single page.", "Booking voucher - Sanne Plumard.pdf - Booking voucher for Sanne Plumard. It shows a date of issue of 31 March 2026. It is a single page.", "Vehicle condition report - Sanne Plumard.pdf - Vehicle condition report for Sanne Plumard. It shows a date of issue of 21 February 2026. It is 2 pages, complete, and it is signed by the inspecting branch staff member."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The verdict complete: every applicable line is met (extra documents do not matter). The verdict incomplete: at least one applicable line is not met. The verdict unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-21", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00008-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Glenstead Ltd", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "3 August 2026"}, "checklist": ["Signed bank charges and interest explanation sheet.", "If the account is a foreign currency account, also: signed exchange rate conversion schedule.", "Outstanding receipts list.", "Signed reviewer sign-off sheet for the reconciliation.", "Signed bank reconciliation statement.", "If the reconciliation shows an unexplained difference that is not an outstanding item, also: signed unexplained difference investigation note.", "Direct debit mandate report from the bank, issued within the last 3 months."], "submission": {"case": {"name": "company bank account ZZ-59368", "reference": "LP-94539", "details": ["The account is a foreign currency account.", "The reconciliation shows an unexplained difference that is not an outstanding item."]}, "documents received": ["reviewer_sign-off_sheet_ZZ-59368.pdf - Reviewer sign-off sheet for the reconciliation for company bank account ZZ-59368, dated 9 June 2026. It is a single page, signed by the financial controller.", "unexplained_difference_investigation_note_ZZ-59368.pdf - Unexplained difference investigation note for company bank account ZZ-59368, dated 30 April 2026. It is 2 pages, complete, and signed by the financial controller.", "outstanding_receipts_list_ZZ-59368.pdf - Outstanding receipts list for company bank account ZZ-59368, dated 6 July 2026. It is a single page.", "exchange_rate_conversion_schedule_ZZ-59368.pdf - Exchange rate conversion schedule for company bank account ZZ-59368, dated 17 April 2026. It is a single page, signed by the financial controller.", "bank_charges_and_interest_explanation_sheet_ZZ-59368.pdf - Bank charges and interest explanation sheet for company bank account ZZ-59368, dated 13 June 2026. It is a single page, signed by the financial controller.", "bank_reconciliation_statement_ZZ-59368.pdf - Bank reconciliation statement for company bank account ZZ-59368, dated 17 April 2026. It is 2 pages, complete, and signed by the financial controller.", "direct_debit_mandate_report_ZZ-59368.pdf - Direct debit mandate report from the bank for company bank account ZZ-59368, dated 1 July 2026. It is 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack is complete per the checklist. Go over every checklist line that applies to this case. Only a document of the listed kind counts (not a similar one), and it must be about the case's subject, have all its pages, be signed wherever the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: at least one applicable line is not satisfied. unclear: no line is clearly not met, but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-9", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 964}} {"id": "isc-te-00086-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zervcourt plc", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "3 June 2026"}, "checklist": ["Check the passport: it must be valid, meaning not expired, on 3 June 2026, and it must be signed.", "Check the vehicle condition report: it must be signed.", "Check the booking voucher: it must have been issued within the last 6 months.", "Check the credit card in the driver's name: it must be valid, meaning not expired, on 3 June 2026, and it must be signed."], "submission": {"case": {"name": "Sanne Plumard", "reference": "MC-25332"}, "documents received": ["Passport - Sanne Plumard.jpg - Passport belonging to Sanne Plumard. It shows an expiry date of 24 November 2026. It is a single page, signed by the passport holder.", "Price comparison screenshot - Sanne Plumard.png - Price comparison screenshot from a search website for Sanne Plumard. It shows a date of issue of 31 March 2026. It is a single page.", "Booking voucher - Sanne Plumard.pdf - Booking voucher for Sanne Plumard. It shows a date of issue of 31 March 2026. It is a single page.", "Credit card - Sanne Plumard.jpg - Credit card in the driver's name for Sanne Plumard. It shows an expiry date of 22 October 2027. It is a single page, signed by the cardholder.", "Vehicle condition report - Sanne Plumard.pdf - Vehicle condition report for Sanne Plumard. It shows a date of issue of 21 February 2026. It is 2 pages, complete, and it is signed by the inspecting branch staff member."]}}, "question": {"type": "choice", "instructions": "The task is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-51", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 799}} {"id": "isc-te-00192-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Glenthorpe Inc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "3 April 2026"}, "checklist": ["Shareholder register extract issued within the last 3 months.", "Beneficial owner identification form, signed.", "Certificate of incorporation.", "Company tax registration certificate.", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents.", "Board resolution to open the account, signed.", "Company statutes, signed."], "submission": {"case": {"name": "Austshaw LLP", "reference": "DH-79163", "details": ["All beneficial owners of the company are residents."]}, "documents received": ["Beneficial owner identification form - Austshaw LLP.pdf\nA beneficial owner identification form for Austshaw LLP, dated 25 March 2026. 3 pages, complete. It is signed by a beneficial owner.", "Board resolution to open the account - Austshaw LLP.pdf\nA board resolution to open the account for Austshaw LLP, dated 2 February 2026. Single page. It is signed by a director.", "Certificate of incorporation - Austshaw LLP.pdf\nA certificate of incorporation for Austshaw LLP, dated 6 January 2026. Single page.", "Company tax registration certificate - Austshaw LLP.pdf\nA company tax registration certificate for Austshaw LLP, dated 31 December 2025. Single page.", "Company statutes - Austshaw LLP.pdf\nCompany statutes for Austshaw LLP, dated 19 February 2026. 12 pages, complete. It is signed by a director.", "Authorised signer identity document - Austshaw LLP.pdf\nAn authorised signer identity document for Austshaw LLP showing an expiry date of 29 January 2028. Single page.", "Shareholder register extract - Austshaw LLP.pdf\nA shareholder register extract for Austshaw LLP, dated 17 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document the checklist lists (not one that merely looks similar), it is about the case's subject, it has all its pages, it is signed wherever the checklist asks for a signature, it has not expired on the review date, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents are irrelevant. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-59", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 820}} {"id": "isc-te-00203-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Marlfell Limited", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "22 May 2026"}, "checklist": ["If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Photographs of the fault, issued within the last 3 months.", "Access authorisation slip, signed.", "Location details sheet.", "Parts order confirmation, issued within the last 1 months.", "Job request form, signed.", "Cost estimate, issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request WG-2235", "reference": "JG-32987", "details": ["The job involves no work at height above two metres."]}, "documents received": ["Parts order confirmation, maintenance request WG-2235. Date of issue: 13 May 2026. Single page.", "Photographs of the fault, maintenance request WG-2235. Date of issue: 10 May 2026. Pages 1-1 are included; the total number of pages is not shown anywhere.", "Access authorisation slip, maintenance request WG-2235. Date of issue: 1 May 2026. Single page. Signed by the site access controller.", "Job request form, maintenance request WG-2235. Date of issue: 30 April 2026. Single page. Signed by the requesting manager.", "Location details sheet, maintenance request WG-2235. Date of issue: 29 April 2026. Single page.", "Cost estimate, maintenance request WG-2235. Date of issue: 29 April 2026. 2 pages, complete. Signed by the estimating supervisor."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 801}} {"id": "isc-te-00030-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Orrburg Limited", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "12 June 2026"}, "checklist": ["Utility supplier's letter confirming the supply was cut off (issued within the last 12 months)", "Drying contractor's certificate of completion (issued within the last 6 months, signed)", "Flood claim form (signed)", "Only if this applies: 'The flood water reached the upper floor of the property': upper floor damage schedule (signed)", "Photographs of flood water in the rooms (issued within the last 1 months)"], "submission": {"case": {"name": "property AU-50577", "reference": "EO-64610", "details": ["The flood water stayed at ground floor level."]}, "documents received": ["AU-50577_drying_contractors_certificate_of_completion.pdf. Drying contractor's certificate of completion for property AU-50577, dated 11 January 2026. 2 pages, complete. Signed by the drying contractor.", "AU-50577_utility_suppliers_letter.pdf. Utility supplier's letter confirming the supply was cut off for property AU-50577, dated 21 August 2025. 1 page.", "AU-50577_flood_claim_form.pdf. Flood claim form for property AU-50577, dated 7 March 2026. 5 pages, complete. Signed by the policyholder.", "AU-50577_photographs_of_flood_water_in_the_rooms.pdf. Photographs of flood water in the rooms of property AU-50577, dated 10 June 2026. 3 pages, complete.", "AU-50577_loss_adjusters_inspection_report.pdf. Loss adjuster's inspection report for property AU-50577, dated 5 April 2026. 6 pages, complete. Signed by the loss adjuster."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00071-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Jundhurst GmbH", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "7 August 2026"}, "checklist": ["If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review.", "Three quotes comparison sheet, issued within the last 3 months, signed.", "Equipment purchase request form, signed.", "Grant fund eligibility note, issued within the last 6 months, signed.", "Installation requirements note."], "submission": {"case": {"name": "equipment LF-3374", "reference": "UQ-10155", "details": ["The equipment uses radioactive sources."]}, "documents received": ["Installation requirements note for equipment LF-3374, issued 3 July 2026. 2 pages, complete.", "Three quotes comparison sheet for equipment LF-3374, issued 22 July 2026. Single page. Signed by the procurement officer.", "Single vendor quotation for equipment LF-3374, issued 22 July 2026. Single page. Signed by the vendor's sales representative.", "Grant fund eligibility note for equipment LF-3374, issued 7 April 2026. Single page. Signed by the grants officer.", "Equipment purchase request form for equipment LF-3374, issued 8 May 2026. 2 pages, complete. Signed by the requesting department head.", "Training needs assessment for equipment LF-3374, issued 28 May 2026. Single page. Signed by the training coordinator.", "Radiation licence for equipment LF-3374, showing an expiry date of 22 June 2028. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 764}} {"id": "isc-te-00230-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Stromheim Partners", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "18 September 2026"}, "checklist": ["Waste disposal plan: confirm it is included.", "If the kit includes an electrical display unit, also: electrical safety test certificate issued within the last 12 months, confirm it is included.", "Kit contents list: confirm it is included.", "Brand colour specification: confirm it is included.", "Kit cost breakdown issued within the last 3 months and signed: confirm it is included."], "submission": {"case": {"name": "merchandising kit QI-72418", "reference": "QU-47115", "details": ["The kit includes an electrical display unit."]}, "cover note": "Apologies that this pack was put together in a rush.", "documents received": ["Brand colour specification for merchandising kit QI-72418. Date of issue: 5 July 2026. 1 page.", "Electrical safety test certificate for merchandising kit QI-72418. Date of issue: 21 July 2026. 1 page.", "Waste disposal plan for merchandising kit QI-72418. Date of issue: 31 July 2026. 1 page.", "Kit cost breakdown for merchandising kit QI-72418. Date of issue: 3 July 2026. 2 pages, complete. Signed by the finance manager.", "Kit contents list for merchandising kit QI-72418. Date of issue: 30 June 2026. 2 pages, complete.", "Flammability test certificate for merchandising kit QI-72418. Date of issue: 21 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00270-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Brenbrook plc", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "12 March 2026"}, "checklist": ["Risk assessment, issued within the last 3 months and signed", "If the change is planned during the year-end close period, also: freeze period exception approval, signed", "Proposed rule change specification, signed", "Current rule set export, issued within the last 1 months", "Post-change test plan, signed"], "submission": {"case": {"name": "firewall change KF-54774", "reference": "PF-69842", "details": ["The change is planned during the year-end close period."]}, "documents received": ["Post-change test plan, firewall change KF-54774. Date of issue: 6 March 2026. 2 pages, complete. Signed by the test analyst.", "Proposed rule change specification, firewall change KF-54774. Date of issue: 3 December 2025. 2 pages, complete. Signed by the firewall engineer.", "Freeze period exception approval, firewall change KF-54774. Date of issue: 15 November 2025. Single page. Signed by the IT operations manager.", "Current rule set export, firewall change KF-54774. Date of issue: 26 February 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 697}} {"id": "isc-te-00163-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Fervbrook Limited", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "13 August 2026"}, "checklist": ["Doctoral researcher progress summary, issued within the last 6 months and signed.", "Financial expenditure summary, issued within the last 3 months and signed.", "If the institute hosts research involving human participants, also: ethics committee annual return, issued within the last 12 months and signed.", "Intellectual property register extract, issued within the last 6 months and signed.", "External advisory board minutes, issued within the last 12 months and signed.", "Annual activity report, issued within the last 6 months and signed.", "Staffing plan, issued within the last 6 months and signed."], "submission": {"case": {"name": "Arvmont Inc", "reference": "QZ-81186", "details": ["The institute hosts research involving human participants."]}, "cover note": "Dear committee members, please find enclosed the pack for review. My colleague has already checked it over, so it should be in order. Kind regards, Sarah Nebbsen", "documents received": ["Ethics committee annual return for Arvmont Inc, dated 21 May 2026; 2 pages, complete. Signed by the ethics committee chair.", "Intellectual property register extract for Arvmont Inc, dated 10 April 2026; 1 page. Signed by the register keeper.", "Financial expenditure summary for Arvmont Inc, dated 29 May 2026; 3 pages, complete. Signed by the institute finance officer.", "Doctoral researcher progress summary for Arvmont Inc, dated 30 July 2026; 2 pages, complete. Signed by the supervising professor.", "External advisory board minutes for Arvmont Inc, dated 3 February 2026; 4 pages, complete. Signed by the board secretary.", "Annual activity report for Arvmont Inc, dated 7 May 2026; pages 1-4 of 12 are included. Signed by the institute director.", "Publications list for Arvmont Inc, dated 8 October 2025; 4 pages, complete.", "Staffing plan for Arvmont Inc, dated 27 February 2026; 2 pages, complete. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 902}} {"id": "isc-te-00080-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Morvfell & Co", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "26 August 2026"}, "checklist": ["Root cause analysis report, issued within the last 3 months and signed.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Service level objective breach record, issued within the last 3 months.", "Follow-up owner assignment sheet, issued within the last 3 months and signed.", "Alerting rules review note, issued within the last 3 months."], "submission": {"case": {"name": "production incident VT-77812", "reference": "UP-54074"}, "cover note": "I am not sure everything needed is in this pack, so please take a look and tell me if anything should be added before we close the incident.", "documents received": ["Alerting rules review note for production incident VT-77812, dated 21 June 2026. 2 pages, complete.", "Service level objective breach record for production incident VT-77812, dated 29 June 2026. Single page.", "Postmortem meeting minutes for production incident VT-77812, dated 20 July 2026. 3 pages, complete. Signed by the chair of the postmortem meeting.", "Root cause analysis report for production incident VT-77812, dated 7 July 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Follow-up owner assignment sheet for production incident VT-77812, dated 13 June 2026. Single page. Signed by the reliability engineering manager."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 761}} {"id": "isc-te-00395-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Creskwater Ltd", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "16 September 2026"}, "checklist": ["Default notice previously served, issued within the last 6 months, signed.", "If the defaulting party is a public sector body, also: public sector termination approvals record, issued within the last 3 months, signed.", "Losses calculation statement, issued within the last 1 months, signed.", "Termination clause legal opinion, issued within the last 1 months, signed.", "Termination notice draft, signed.", "Original service agreement copy.", "Cure period expiry calculation, issued within the last 1 months, signed."], "submission": {"case": {"name": "Kaldbury GmbH", "reference": "XV-18490", "details": ["The defaulting party is a private company."]}, "documents received": ["Litigation hold notice - Kaldbury GmbH.pdf. This is the litigation hold notice about Kaldbury GmbH, dated 3 September 2026. It is 2 pages, complete, and signed by the head of legal.", "Losses calculation statement - Kaldbury GmbH.pdf. This is the losses calculation statement about Kaldbury GmbH, dated 26 August 2026. It is 3 pages, complete, and signed by the finance director.", "Original service agreement copy - Kaldbury GmbH.pdf. This is the original service agreement copy about Kaldbury GmbH, dated 9 June 2026. It is 10 pages, complete.", "Termination notice draft - Kaldbury GmbH.pdf. This is the termination notice draft about Kaldbury GmbH, dated 13 July 2026. It is 2 pages, complete, and signed by the head of legal.", "Cure period expiry calculation - Kaldbury GmbH.pdf. This is the cure period expiry calculation about Kaldbury GmbH, dated 14 September 2026. It is 2 pages, complete, and signed by the contract manager.", "Termination clause legal opinion - Kaldbury GmbH.pdf. This is the termination clause legal opinion about Kaldbury GmbH, dated 8 September 2026. It is 5 pages, complete, and signed by external counsel."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 885}} {"id": "isc-te-00412-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Cranhall GmbH", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "1 September 2026"}, "checklist": ["Check that the placement learning plan is included and signed.", "If the intern is under 18 years old, also check that the parent or guardian consent form is included and signed.", "Check that the mentor assignment note is included and signed.", "Check that the internship agreement is included and signed.", "Check that the right to work check record is included, signed, and was issued within the last 6 months."], "submission": {"case": {"name": "Thomas Wraxell", "reference": "BC-74476", "details": ["The intern is under 18 years old."]}, "documents received": ["internship_agreement_wraxell.pdf - Internship agreement for Thomas Wraxell, issued 18 May 2026. 4 pages, complete. Signed by the marketing department head and the intern.", "right_to_work_check_wraxell_2026-02-14.pdf - Right to work check record for Thomas Wraxell, issued 14 February 2026. 1 page. Signed by the HR records officer.", "placement_learning_plan_wraxell.pdf - Placement learning plan for Thomas Wraxell, issued 18 May 2026. 2 pages, complete. Signed by the marketing department supervisor.", "mentor_assignment_note_wraxell.pdf - Mentor assignment note for Thomas Wraxell, issued 25 May 2026. 1 page. Signed by the marketing operations team lead.", "parent_guardian_consent_wraxell.pdf - Parent or guardian consent form for Thomas Wraxell, issued 18 May 2026. 1 page. Signed by the parent or guardian.", "it_equipment_loan_wraxell.pdf - IT equipment loan form for Thomas Wraxell, issued 19 May 2026. 1 page. Signed by the IT support coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 817}} {"id": "isc-te-00443-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Yondfield Group", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "16 April 2026"}, "checklist": ["Problem statement page", "Cost estimate sheet issued within the last 6 months", "Capacity and load estimate issued within the last 6 months", "Alternatives considered table"], "submission": {"case": {"name": "design document ZP-11113", "reference": "XV-29298"}, "documents received": ["Capacity and load estimate for design document ZP-11113, dated 19 February 2026. 3 pages, complete.", "Alternatives considered table for design document ZP-11113, dated 16 February 2026. Pages 1-1 of 2 are included.", "Review board feedback summary for design document ZP-11113, dated 2 March 2026. 2 pages, complete. Signed by the review board chair.", "Problem statement page for design document ZP-11113, dated 6 March 2026. 2 pages, complete.", "Cost estimate sheet for design document ZP-11113, dated 6 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 667}} {"id": "isc-te-00444-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Rosford Inc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "9 June 2026"}, "checklist": ["Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Root cause analysis report, issued within the last 3 months, signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Customer impact statement, issued within the last 3 months."], "submission": {"case": {"name": "production incident HL-93807", "reference": "ZA-47773", "details": ["The incident was caused by a third-party service outage."]}, "documents received": ["Root cause analysis report for production incident HL-93807, dated 5 April 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Customer impact statement for production incident HL-93807, dated 4 April 2026. 2 pages, complete.", "Incident timeline for production incident HL-93807, dated 3 May 2026. 3 pages, complete.", "Follow-up owner assignment sheet for production incident HL-93807, dated 11 May 2026. A single page, signed by the reliability engineering lead.", "Service level objective breach record for production incident HL-93807, dated 20 May 2026. A single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 730}} {"id": "isc-te-00444-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Rosford Inc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "9 June 2026"}, "checklist": ["Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Root cause analysis report, issued within the last 3 months, signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Customer impact statement, issued within the last 3 months."], "submission": {"case": {"name": "production incident HL-93807", "reference": "ZA-47773", "details": ["The incident was caused by a third-party service outage."]}, "documents received": ["Incident timeline for production incident HL-93807, dated 3 May 2026. 3 pages, complete.", "Customer impact statement for production incident HL-93807, dated 4 April 2026. 2 pages, complete.", "Alerting rules review note for production incident HL-93807, dated 25 April 2026. 2 pages, complete.", "Root cause analysis report for production incident HL-93807, dated 5 April 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Follow-up owner assignment sheet for production incident HL-93807, dated 11 May 2026. A single page, signed by the reliability engineering lead.", "Service level objective breach record for production incident HL-93807, dated 20 May 2026. A single page."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Consider every checklist line that applies to this case. A required document counts only when it is the kind of document listed (not a similar one), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it has not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-4", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 769}} {"id": "isc-te-00016-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Jundburg Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "7 July 2026"}, "checklist": ["Payment confirmation, issued within the last 3 months.", "Prerequisite certificate.", "Venue access instructions, issued within the last 3 months.", "If the delegate requires an adjusted learning plan, also: learning support agreement, signed.", "Course booking form, signed.", "Cancellation policy acceptance, signed.", "Special requirements note."], "submission": {"case": {"name": "course booking MS-72228", "reference": "IX-67327", "details": ["The delegate requires an adjusted learning plan."]}, "documents received": ["course_booking_form_22Apr2026.pdf: A course booking form about course booking MS-72228. It shows a date of issue of 22 April 2026 and has 2 pages, complete. It bears the signature of the delegate.", "screenshot_basket_17May2026.pdf: A screenshot of items left in an online basket about course booking MS-72228. It shows a date of issue of 17 May 2026 and is a single page.", "special_requirements_note_17Mar2026.pdf: A special requirements note about course booking MS-72228. It shows a date of issue of 17 March 2026 and is a single page.", "cancellation_policy_acceptance_12Apr2026.pdf: A cancellation policy acceptance about course booking MS-72228. It shows a date of issue of 12 April 2026, is a single page and bears the signature of the delegate.", "prerequisite_certificate_12Jun2026.pdf: A prerequisite certificate about course booking MS-72228. It shows a date of issue of 12 June 2026 and is a single page.", "venue_access_instructions_1May2026.pdf: Venue access instructions about course booking MS-72228. It shows a date of issue of 1 May 2026 and is a single page.", "learning_support_agreement_19Mar2026.pdf: A learning support agreement about course booking MS-72228. It shows a date of issue of 19 March 2026, is a single page and bears the signature of the course administrator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 920}} {"id": "isc-te-00248-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Aldston BV", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "27 July 2026"}, "checklist": ["benefit entitlement letters issued within the last 12 months", "support plan, signed", "safeguarding referral form issued within the last 12 months, signed", "If the adult lacks capacity to make the decision about their care arrangements, also: best interests decision record, signed", "capacity assessment record, signed", "recent bank statements issued within the last 3 months", "proof of identity valid (not expired) on the date of the review"], "submission": {"case": {"name": "Elena Lundton", "reference": "VW-56695", "details": ["The adult lacks capacity to make the decision about their care arrangements."]}, "documents received": ["Best interests decision record. The document concerns Elena Lundton and shows its date of issue as 5 July 2026. 4 pages, complete. It is signed by the best interests assessor.", "Benefit entitlement letters. The document concerns Elena Lundton and shows its date of issue as 19 July 2026. 2 pages, complete.", "Support plan. The document concerns Elena Lundton and shows its date of issue as 20 April 2026. Pages 1 to 5 are included and the total number of pages is not shown anywhere. It is signed by the care coordinator.", "Recent bank statements. The document concerns Elena Lundton and shows its date of issue as 21 June 2026. 8 pages, complete.", "Financial assessment form. The document concerns Elena Lundton and shows its date of issue as 17 July 2026. 6 pages, complete. It is signed by the financial assessment officer.", "Safeguarding referral form. The document concerns Elena Lundton and shows its date of issue as 23 December 2025. 2 pages, complete. It is signed by the safeguarding lead officer.", "Capacity assessment record. The document concerns Elena Lundton and shows its date of issue as 9 April 2026. 4 pages, complete. It is signed by the capacity assessor.", "Proof of identity. The document concerns Elena Lundton and shows its expiry date as 10 November 2027. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 901}} {"id": "isc-te-00091-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Stervside plc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "3 August 2026"}, "checklist": ["Shared mailbox handover record, issued within the last 1 months and signed", "Leaver notification form, signed", "Service desk ticket closure summary, issued within the last 1 months", "Access rights inventory, issued within the last 1 months", "Non-disclosure reminder acknowledgement, signed"], "submission": {"case": {"name": "Siobhan Foskthwaite", "reference": "HW-35438"}, "documents received": ["service_desk_ticket_closure_summary_HW-35438.pdf — Service desk ticket closure summary for Siobhan Foskthwaite. Dated 22 July 2026. 3 pages, complete.", "access_rights_inventory_HW-35438.pdf — Access rights inventory for Siobhan Foskthwaite. Dated 20 July 2026. 4 pages, complete.", "non_disclosure_reminder_acknowledgement_HW-35438.pdf — Non-disclosure reminder acknowledgement for Siobhan Foskthwaite. Dated 9 July 2026. Single page, signed by the departing employee.", "software_titles_list_HW-35438.pdf — List of software titles the company owns, relating to Siobhan Foskthwaite. Dated 20 July 2026. 4 pages, complete.", "shared_mailbox_handover_record_HW-35438.pdf — Shared mailbox handover record for Siobhan Foskthwaite. Dated 20 July 2026. 2 pages, complete, signed by the departing employee.", "leaver_notification_form_HW-35438.pdf — Leaver notification form for Siobhan Foskthwaite. Dated 27 April 2026. 2 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 822}} {"id": "isc-te-00077-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Elstham SAS", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "17 July 2026"}, "checklist": ["Payment gateway technical specification for the gateway, on file.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review.", "Test environment transaction log, issued within the last 1 months.", "Data protection impact assessment, issued within the last 12 months, signed.", "Gateway integration request form, signed."], "submission": {"case": {"name": "payment gateway FY-30649", "reference": "NK-85955", "details": ["The gateway will not store customers' card details."]}, "documents received": ["Data protection impact assessment for payment gateway FY-30649, dated 12 October 2025, signed by the Data Protection Officer. 5 pages, complete.", "Fraud screening configuration sheet for payment gateway FY-30649, dated 26 May 2026, signed by the fraud screening lead. Single page.", "Payment gateway technical specification for payment gateway FY-30649, dated 28 March 2026. 8 pages, complete.", "Test environment transaction log for payment gateway FY-30649, dated 9 June 2026. 4 pages, complete.", "Gateway integration request form for payment gateway FY-30649, dated 9 April 2026, signed by the requesting manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 735}} {"id": "isc-te-00022-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Orrham & Co", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "26 March 2026"}, "checklist": ["Cost estimate, issued within the last 3 months and signed.", "Planned completion date sheet, signed.", "Parts order confirmation, issued within the last 1 months.", "Photographs of the fault, issued within the last 3 months.", "If the job involves working at height above two metres, also: permit to work at height, issued within the last 1 months and signed.", "Risk assessment for the task, issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request GA-62900", "reference": "IH-29832", "details": ["The job involves no work at height above two metres."]}, "documents received": ["planned-completion-date-sheet-GA-62900.pdf - Planned completion date sheet for maintenance request GA-62900, issued 12 February 2026. Single page. Signed by the job planner.", "photographs-of-the-fault-GA-62900.pdf - Photographs of the fault for maintenance request GA-62900, issued 2 February 2026. 2 pages, complete.", "cost-estimate-GA-62900.pdf - Cost estimate for maintenance request GA-62900. The date of issue is smudged and cannot be read. 2 pages, complete. Signed by the estimator.", "parts-order-confirmation-GA-62900.pdf - Parts order confirmation for maintenance request GA-62900, issued 9 March 2026. Single page.", "risk-assessment-for-the-task-GA-62900.pdf - Risk assessment for the task for maintenance request GA-62900, issued 18 March 2026. 5 pages, complete. Signed by the assessor."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 822}} {"id": "isc-te-00392-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Ambstead SAS", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "10 September 2026"}, "checklist": ["Production downtime log, issued within the last 3 months and signed.", "Photographs of the failed component.", "Policy machinery schedule.", "If a temporary machine was hired to keep production going, also: temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Equipment breakdown claim form, signed."], "submission": {"case": {"name": "failed machine VR-6417", "reference": "NN-62631", "details": ["No temporary machine was hired to keep production going."]}, "documents received": ["Policy_machinery_schedule_VR-6417.pdf. This policy machinery schedule for failed machine VR-6417 is dated 3 July 2026 and runs to 3 pages, complete.", "Equipment_breakdown_claim_form_VR-6417.pdf. This equipment breakdown claim form for failed machine VR-6417 is dated 25 May 2026 and is 3 pages, complete. The form is signed by the policyholder.", "Photographs_of_failed_component_VR-6417.pdf. These photographs of the failed component of machine VR-6417 are dated 12 July 2026 and come as 2 pages, complete.", "Production_downtime_log_VR-6417_6_June_2026.pdf. This production downtime log for failed machine VR-6417 is dated 6 June 2026 and is 2 pages, complete. The log is signed by the production supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00123-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Thalhall GmbH", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "7 July 2026"}, "checklist": ["Drying contractor's certificate of completion, issued within the last 6 months and signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "Flood claim form, signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Buildings insurance policy schedule"], "submission": {"case": {"name": "property TU-69693", "reference": "ED-62889"}, "documents received": ["Drying contractor's certificate of completion for property TU-69693, dated 20 June 2026. 2 pages, complete. Signed by the drying contractor.", "Flood claim form for property TU-69693, dated 4 April 2026. 5 pages, complete. Signed by the claimant.", "Buildings insurance policy schedule for property TU-69693, dated 7 June 2026. 5 pages, complete.", "Utility supplier's letter confirming the supply was cut off for property TU-69693, dated 9 August 2025. 1 page.", "Photographs of flood water in the rooms for property TU-69693, dated 17 June 2026. Pages 1-1 of 3.", "Council flood warning notice for property TU-69693, dated 5 June 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 739}} {"id": "isc-te-00274-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Vasklund GmbH", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "19 June 2026"}, "checklist": ["Asset register update, issued within the last 1 months", "Data wipe certificate, issued within the last 3 months, signed", "Final backup confirmation, issued within the last 3 months, signed", "Data migration confirmation, issued within the last 3 months, signed", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed", "Licence reassignment note, issued within the last 3 months, signed"], "submission": {"case": {"name": "retired server PX-71814", "reference": "WW-93737"}, "cover note": "A colleague has already checked this pack, so it should be ready to go through.", "documents received": ["Asset register update for retired server PX-71814, dated 29 May 2026, 1 page.", "Data migration confirmation for retired server PX-71814, dated 16 April 2026, 2 pages, complete, signed by the migration lead.", "Licence reassignment note for retired server PX-71814, dated 1 April 2026, 1 page, signed by the licence manager.", "Final backup confirmation for retired server PX-71814, dated 27 April 2026, 1 page, signed by the backup administrator.", "Data wipe certificate for retired server PX-71814, dated 12 May 2026, 1 page, signed by the data sanitisation technician."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00456-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Stromstow Partners", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "2 April 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed", "Employee bank detail confirmation, issued within the last 6 months and signed", "Travel advance request form, signed", "Travel policy extract showing advance eligibility", "If the trip involves travel to another country, also: foreign travel authorisation from a director, signed", "Outstanding advance clearance check, signed", "Line manager approval for the advance, signed"], "submission": {"case": {"name": "Sophie Moskini", "reference": "RK-62728", "details": ["The trip is wholly within the home country."]}, "documents received": ["Travel_Policy_Extract_Advance_Eligibility_SM_27012026.pdf — Travel policy extract showing advance eligibility for Sophie Moskini, dated 27 January 2026. Single page.", "Outstanding_Advance_Clearance_Check_SM_26122025.pdf — Outstanding advance clearance check for Sophie Moskini, dated 26 December 2025. Single page. Signed by an accounts payable reviewer.", "File_0003_SM.pdf — The file will not open, so its contents cannot be seen.", "Trip_Itinerary_and_Approval_SM_30032026.pdf — Trip itinerary and approval for Sophie Moskini, dated 30 March 2026. 2 pages, complete. Signed by the line manager.", "Employee_Bank_Detail_Confirmation_SM_01112025.pdf — Employee bank detail confirmation for Sophie Moskini, dated 1 November 2025. Single page. Signed by Sophie Moskini.", "Line_Manager_Approval_Advance_SM_03032026.pdf — Line manager approval for the advance for Sophie Moskini, dated 3 March 2026. Single page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00209-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Corvley Limited", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "29 May 2026"}, "checklist": ["Check that the proposed working pattern plan is included and signed.", "Check that the flexible working request form is included and signed.", "Check that the impact assessment on the team is included and signed.", "If the employee has caring responsibilities for a dependent, also: check that the caring responsibilities statement is included and signed.", "Check that the trial period proposal is included and signed."], "submission": {"case": {"name": "Harry Holtisey", "reference": "NC-90327", "details": ["The employee has caring responsibilities for a dependent."]}, "cover note": "Please find attached the pack for reference NC-90327. I apologise that the pack was put together in a rush.", "documents received": ["A flexible working request form concerning Harry Holtisey, dated 23 February 2026. 3 pages, complete. Signed by Harry Holtisey.", "An impact assessment on the team concerning Harry Holtisey, dated 1 February 2026. 3 pages, complete. Signed by the line manager.", "A proposed working pattern plan concerning Harry Holtisey, dated 4 May 2026. 2 pages, complete. Signed by the line manager.", "A caring responsibilities statement concerning Harry Holtisey, dated 14 February 2026. Single page. Signed by Harry Holtisey.", "A trial period proposal concerning Harry Holtisey, dated 7 April 2026. Single page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 737}} {"id": "isc-te-00147-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Mersheim Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "10 April 2026"}, "checklist": ["If the borrower is self-employed, also include: two most recent tax year overviews, issued within the last 18 months, signed.", "If the property being bought is a flat in a shared building, also include: management company pack, issued within the last 3 months.", "Property valuation report, issued within the last 3 months, signed.", "Three months of bank statements, issued within the last 3 months.", "Three most recent payslips, issued within the last 3 months.", "Passport, valid (not expired) on the date of the review.", "Gifted deposit letter, issued within the last 3 months, signed."], "submission": {"case": {"name": "Charlotte Paskthwaite", "reference": "ZE-83977", "details": ["The borrower is self-employed.", "The property being bought is a flat in a shared building."]}, "documents received": ["P60 tax summary for Charlotte Paskthwaite. Date of issue: 18 November 2025. 2 pages, complete.", "Three months of bank statements for Charlotte Paskthwaite. Date of issue: 13 February 2026. 9 pages, complete.", "Three most recent payslips for Charlotte Paskthwaite. Date of issue: 13 March 2026. 3 pages, complete.", "Mortgage application form for Charlotte Paskthwaite. Date of issue: 18 March 2026. 10 pages, complete. Signed by the borrower, Charlotte Paskthwaite.", "Gifted deposit letter for Charlotte Paskthwaite. Date of issue: 4 January 2026. Single page. Signed by the person gifting the deposit.", "Passport for Charlotte Paskthwaite. Expiry date: 13 April 2028. 2 pages, complete.", "Management company pack for Charlotte Paskthwaite. Date of issue: 17 February 2026. 12 pages, complete.", "Property valuation report for Charlotte Paskthwaite. Date of issue: 3 March 2026. 8 pages, complete. Signed by the surveyor who carried out the valuation.", "Two most recent tax year overviews for Charlotte Paskthwaite. Date of issue: 17 July 2025. 4 pages, complete. Signed by HMRC, the issuing tax authority."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 951}} {"id": "isc-te-00135-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Corvburg plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "16 September 2026"}, "checklist": ["Certified quality management system certificate, valid (not expired) on the date of the review.", "Supplier audit report, issued within the last 24 months, signed.", "Supplier self-assessment report, issued within the last 12 months, signed.", "Supplier corrective action plan, issued within the last 6 months, signed."], "submission": {"case": {"name": "Larvhall Ltd", "reference": "DV-11392"}, "documents received": ["Supplier audit report for Larvhall Ltd, issued 14 August 2026, 8 pages, complete. Signed by the lead auditor.", "Supplier corrective action plan for Larvhall Ltd, issued 26 June 2026, 3 pages, complete. Signed by the Larvhall quality manager.", "Single-page certified quality management system certificate for Larvhall Ltd, showing an expiry date of 20 May 2028."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 620}} {"id": "isc-te-00261-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Istcrest plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "21 August 2026"}, "checklist": ["Check that the pack contains a customer impact statement issued within the last 3 months.", "Check that the pack contains a root cause analysis report issued within the last 3 months and signed.", "Check that the pack contains postmortem meeting minutes issued within the last 3 months and signed.", "Check that the pack contains a service level objective breach record issued within the last 3 months."], "submission": {"case": {"name": "production incident OW-67810", "reference": "MF-56865"}, "documents received": ["Root cause analysis report about production incident OW-67810. It shows its date of issue as 7 July 2026. 5 pages, complete. It is signed by the reliability engineering lead.", "Postmortem meeting minutes about production incident OW-67810. It shows its date of issue as 25 June 2026. 3 pages, complete. It is signed by the chair of the postmortem meeting.", "Remediation items list about production incident OW-67810. It shows its date of issue as 13 July 2026. 2 pages, complete. It is signed by the incident commander.", "Customer impact statement about production incident OW-67810. It shows its date of issue as 19 August 2026. 2 pages, complete.", "Press release about a new product launch about production incident OW-67810. It shows its date of issue as 19 August 2026. 2 pages, complete.", "Service level objective breach record about production incident OW-67810. It shows its date of issue as 7 August 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 802}} {"id": "isc-te-00292-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Elvcombe Group", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "17 June 2026"}, "checklist": ["Furniture inventory list, issued within the last 1 months and signed", "Movers insurance certificate, valid (not expired) on the date of the review", "If the move includes taking furniture to a storage unit, also: storage unit access authorisation, signed", "Signed move plan", "New floor snagging list, issued within the last 1 months and signed", "Parking bay suspension approval, issued within the last 1 months and signed", "Lifting equipment inspection report, issued within the last 6 months and signed"], "submission": {"case": {"name": "office move project BE-20815", "reference": "GI-40044", "details": ["The move includes taking furniture to a storage unit."]}, "documents received": ["storage-access-BE-20815.pdf - Storage unit access authorisation for office move project BE-20815, dated 5 June 2026. Single page. Signed by the storage unit site manager.", "snagging-list-BE-20815-04-06.pdf - New floor snagging list for office move project BE-20815, dated 4 June 2026. 3 pages, complete. Signed by the new floor site manager.", "it-decommissioning-BE-20815.pdf - IT decommissioning certificate for office move project BE-20815, dated 29 May 2026. Single page. Signed by the IT support lead.", "lifting-inspection-BE-20815.pdf - Lifting equipment inspection report for office move project BE-20815, dated 21 March 2026. 2 pages, complete. Signed by the lifting equipment inspector.", "furniture-inventory-BE-20815.pdf - Furniture inventory list for office move project BE-20815, dated 28 May 2026. 4 pages, complete. Signed by the facilities manager.", "movers-insurance-BE-20815.pdf - Movers insurance certificate for office move project BE-20815. Shows an expiry date of 24 September 2027. Single page.", "move-plan-BE-20815.pdf - Signed move plan for office move project BE-20815, dated 10 April 2026. 6 pages, complete. Signed by the move project manager.", "parking-suspension-BE-20815.pdf - Parking bay suspension approval for office move project BE-20815, dated 9 June 2026. Single page. Signed by the local highways authority officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1010}} {"id": "isc-te-00468-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Pellstow LLP", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "17 July 2026"}, "checklist": ["Prerequisite certificate", "Delegate photo identification, valid (not expired) on the date of the review", "Special requirements note", "Employer sponsorship letter, issued within the last 3 months, signed"], "submission": {"case": {"name": "course booking KO-47091", "reference": "MS-23733"}, "documents received": ["Delegate photo identification for course booking KO-47091. Expiry date: 12 May 2028. Single page.", "Employer sponsorship letter for course booking KO-47091. Date of issue: 4 June 2026. Single page. The part where a signature would be cannot be seen because the bottom of the page is cropped, so it is not known whether the letter is signed.", "Prerequisite certificate for course booking KO-47091. Date of issue: 22 June 2026. Single page.", "Special requirements note for course booking KO-47091. Date of issue: 3 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 654}} {"id": "isc-te-00399-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Bravhall GmbH", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "7 May 2026"}, "checklist": ["If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement (valid (not expired) on the date of the review, signed)", "fit-out cost estimate (issued within the last 6 months, signed)", "training course completion certificate (issued within the last 12 months)", "pilot operation audit report (issued within the last 6 months, signed)", "signed franchise agreement counterpart (signed)", "franchise disclosure document receipt (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Aldstead Group", "reference": "OF-61011"}, "documents received": ["Aldstead Group operator licence.pdf. The licence expires on 30 September 2028 and runs to 2 pages, complete.", "Aldstead Group training course completion certificate.pdf. The certificate is dated 7 April 2026 and is a single page.", "Aldstead Group fit-out cost estimate.pdf. The estimate is dated 12 April 2026 and runs to 4 pages, complete. It is signed by the fit-out contractor.", "Aldstead Group signed franchise agreement counterpart.pdf. The counterpart is dated 9 April 2026 and runs to 12 pages, complete. It is signed by an authorised signatory of Bravhall GmbH and by Aldstead Group.", "Aldstead Group franchise application form.pdf. The form is dated 3 March 2026 and runs to 3 pages, complete. It is signed by the franchisee's managing director.", "Aldstead Group franchise disclosure document receipt.pdf. The receipt is dated 9 March 2026 and is a single page. It is signed by the franchisee's authorised representative.", "Aldstead Group pilot operation audit report.pdf. The report is dated 17 February 2026 and runs to 8 pages, complete. It is signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00454-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Jundmouth Limited", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "25 March 2026"}, "checklist": ["Licence reassignment note, issued within the last 3 months, signed", "If the server will be sold or donated rather than destroyed, also: disposal vendor certificate of destruction, issued within the last 3 months, signed", "Decommission request form, signed", "Data wipe certificate, issued within the last 3 months, signed", "Data migration confirmation, issued within the last 3 months, signed", "Dependent systems check report, issued within the last 3 months"], "submission": {"case": {"name": "retired server NC-63421", "reference": "LV-96718"}, "documents received": ["Single-page asset register update for retired server NC-63421, dated 21 March 2026.", "Decommission request form for retired server NC-63421, dated 4 February 2026. 2 pages, complete. Signed by the infrastructure operations manager.", "Data migration confirmation for retired server NC-63421, dated 19 January 2026. 2 pages, complete. Signed by the systems migration lead.", "Single-page data wipe certificate for retired server NC-63421, dated 29 January 2026, signed by the disposal technician.", "Dependent systems check report for retired server NC-63421, dated 13 March 2026. 3 pages, complete.", "Single-page licence reassignment note for retired server NC-63421, dated 10 March 2026, signed by the IT asset manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 769}} {"id": "isc-te-00372-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Neskwell Group", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "19 June 2026"}, "checklist": ["Board resolution to open the account, signed.", "Proof of registered office address, issued within the last 3 months.", "Company tax registration certificate.", "Beneficial owner identification form, signed."], "submission": {"case": {"name": "Garnshaw SAS", "reference": "NQ-87354"}, "documents received": ["Authorised_signer_ID.pdf. Authorised signer identity document for Garnshaw SAS, showing an expiry date of 6 October 2026. It is 1 page.", "Beneficial_owner_form_19052026.pdf. Beneficial owner identification form for Garnshaw SAS, dated 19 May 2026. It has 3 pages, complete, and is signed by a director.", "Proof_registered_office_08122025.pdf. Proof of registered office address for Garnshaw SAS, dated 8 December 2025. It is 1 page.", "Tax_registration_certificate_19042026.pdf. Company tax registration certificate for Garnshaw SAS, dated 19 April 2026. It is 1 page.", "Board_resolution_11052026.pdf. Board resolution to open the account for Garnshaw SAS, dated 11 May 2026. It is 1 page and signed by the chairman of the board.", "Proof_registered_office_29032026.pdf. Proof of registered office address for Garnshaw SAS, dated 29 March 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 753}} {"id": "isc-te-00073-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Oskbrook Inc", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 March 2026"}, "checklist": ["External advisory board minutes, issued within the last 12 months, signed.", "Annual activity report, issued within the last 6 months, signed.", "Doctoral researcher progress summary, issued within the last 6 months, signed.", "Director's declaration of interests, issued within the last 12 months, signed."], "submission": {"case": {"name": "Dravhaven & Co", "reference": "AO-71168"}, "documents received": ["AO-71168_external_advisory_board_minutes_2025-08-18.pdf — External advisory board minutes for Dravhaven & Co, dated 18 August 2025. 4 pages, complete. Signed by the chair of the external advisory board.", "AO-71168_doctoral_researcher_progress_summary_2025-10-03_v3.pdf — Doctoral researcher progress summary for Dravhaven & Co, dated 3 October 2025. Pages 1-2 are included; no total page count is shown on the document. Signed by the institute director.", "AO-71168_directors_declaration_of_interests_2025-04-16.pdf — Director's declaration of interests for Dravhaven & Co, dated 16 April 2025. Single page. Signed by the institute director.", "AO-71168_intellectual_property_register_extract_2026-01-29.pdf — Intellectual property register extract for Dravhaven & Co, dated 29 January 2026. Single page. Signed by the institute director.", "AO-71168_annual_activity_report_2026-01-08.pdf — Annual activity report for Dravhaven & Co, dated 8 January 2026. 12 pages, complete. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00423-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pentmont Group", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 May 2026"}, "checklist": ["Line manager approval, signed.", "Visa entry requirement printout, issued within the last 3 months.", "Hotel booking confirmation.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Flight itinerary quote, issued within the last 1 months."], "submission": {"case": {"name": "business trip NZ-61217", "reference": "SD-60329", "details": ["The trip involves travel to a country requiring a visa."]}, "cover note": "Please review the attached pack for business trip NZ-61217, reference SD-60329. I am not certain that everything needed is included, so please let me know if anything further is required before the trip is confirmed.", "documents received": ["Line manager approval for business trip NZ-61217, dated 27 April 2026, 1 page, signed by the line manager.", "Travel policy acknowledgement for business trip NZ-61217, dated 19 May 2026, 1 page, signed by the employee.", "Visa approval letter for business trip NZ-61217, dated 16 March 2026, 2 pages, complete.", "Visa entry requirement printout for business trip NZ-61217, dated 20 May 2026, 2 pages, complete.", "Flight itinerary quote for business trip NZ-61217, dated 23 May 2026, 2 pages, complete.", "Passport copy for international travel for business trip NZ-61217, showing an expiry date of 13 June 2027, 1 page.", "Hotel booking confirmation for business trip NZ-61217, dated 6 February 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00362-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Dornham Ltd", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "27 July 2026"}, "checklist": ["Leaver notification form, signed.", "Equipment return receipt, issued within the last 1 months, signed.", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed.", "Final payroll cut-off note, issued within the last 1 months, signed.", "Service desk ticket closure summary, issued within the last 1 months.", "Shared mailbox handover record, issued within the last 1 months, signed.", "Non-disclosure reminder acknowledgement, signed."], "submission": {"case": {"name": "Niamh Gillock", "reference": "GB-48986", "details": ["The leaver held no privileged administrator accounts."]}, "documents received": ["A non-disclosure reminder acknowledgement for Niamh Gillock, dated 19 April 2026. Single page. Signed by Niamh Gillock.", "A service desk ticket closure summary for Niamh Gillock, dated 10 July 2026. 3 pages, complete.", "An equipment return receipt for Niamh Gillock, dated 7 July 2026. Single page. Signed by the receiving IT asset officer.", "An equipment return receipt for Niamh Gillock, dated 8 December 2025. Single page. Signed by the receiving IT asset officer.", "A leaver notification form for Niamh Gillock, dated 3 May 2026. 2 pages, complete. Signed by the line manager.", "A final payroll cut-off note for Niamh Gillock, dated 16 July 2026. Single page. Signed by the payroll officer.", "A shared mailbox handover record for Niamh Gillock, dated 23 July 2026. 2 pages, complete. Signed by the incoming mailbox owner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 819}} {"id": "isc-te-00144-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Merswood Inc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "29 May 2026"}, "checklist": ["If the account will be run by an external agency, also: agency access agreement (signed)", "admin access list (issued within the last 3 months)", "account purpose statement", "platform terms acceptance record (signed)", "two-factor authentication confirmation (issued within the last 3 months)", "content escalation route (signed)"], "submission": {"case": {"name": "new social media account FY-24531", "reference": "QP-40875", "details": ["The account will be run by an external agency."]}, "documents received": ["Two-factor authentication confirmation, new social media account FY-24531. Date of issue: 15 May 2026. It is a single page.", "Admin access list, new social media account FY-24531. Date of issue: 12 March 2026. It is a single page.", "Account purpose statement, new social media account FY-24531. Date of issue: 30 April 2026. It is a single page.", "Content escalation route, new social media account FY-24531. Date of issue: 17 February 2026. It is a single page. It is signed by the Social Media Governance Lead.", "Platform terms acceptance record, new social media account FY-24531. Date of issue: 20 February 2026. It is a single page. It is signed by the Social Media Governance Lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 746}} {"id": "isc-te-00108-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Austwald plc", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "11 September 2026"}, "checklist": ["Cancellation policy acceptance, signed.", "Venue access instructions, issued within the last 3 months.", "Prerequisite certificate.", "Employer sponsorship letter, issued within the last 3 months and signed.", "Delegate photo identification, valid (not expired) on the date of the review."], "submission": {"case": {"name": "course booking CV-74926", "reference": "ID-51962"}, "documents received": ["cancellation_policy_acceptance_CV-74926_v2.pdf - Cancellation policy acceptance for course booking CV-74926, dated 2 September 2026. It is a single page. It is signed by the delegate.", "prerequisite_certificate_CV-74926.pdf - Prerequisite certificate for course booking CV-74926, dated 11 July 2026. It is a single page.", "employer_sponsorship_letter_CV-74926.pdf - Employer sponsorship letter for course booking CV-74926, dated 22 June 2026. It is a single page. It is signed by the employer's human resources manager.", "venue_access_instructions_CV-74926.pdf - Venue access instructions for course booking CV-74926, dated 30 July 2026. It is a single page.", "course_booking_form_CV-74926.pdf - Course booking form for course booking CV-74926, dated 5 June 2026. It is 2 pages, complete. It is signed by the delegate.", "delegate_photo_identification_CV-74926.pdf - Delegate photo identification for course booking CV-74926, showing an expiry date of 10 December 2026. It is a single page.", "payment_confirmation_CV-74926.pdf - Payment confirmation for course booking CV-74926, dated 5 September 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 861}} {"id": "isc-te-00217-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Wendwater BV", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "6 May 2026"}, "checklist": ["Losses calculation statement, issued within the last 1 month and signed", "Litigation hold notice, issued within the last 1 month and signed", "Original service agreement copy", "Termination notice draft, signed", "Breach evidence log, issued within the last 1 month and signed", "Cure period expiry calculation, issued within the last 1 month and signed"], "submission": {"case": {"name": "Yselmoor Partners", "reference": "PS-88626"}, "documents received": ["original_service_agreement_copy_yselmoor.pdf - Original service agreement copy concerning Yselmoor Partners, dated 18 January 2026. 10 pages, complete.", "cure_period_expiry_calculation_26_march_2026.pdf - Cure period expiry calculation concerning Yselmoor Partners, dated 26 March 2026. 2 pages, complete. Signed by the Contract Administrator.", "losses_calculation_statement_yselmoor.pdf - Losses calculation statement concerning Yselmoor Partners, dated 23 April 2026. 3 pages, complete. Signed by the Chief Financial Officer.", "termination_notice_draft_yselmoor.pdf - Termination notice draft concerning Yselmoor Partners, dated 30 January 2026. 2 pages, complete. Signed by the Commercial Contracts Manager.", "breach_evidence_log_yselmoor.pdf - Breach evidence log concerning Yselmoor Partners, dated 29 April 2026. 6 pages, complete. Signed by the Head of Contract Management.", "litigation_hold_notice_yselmoor.pdf - Litigation hold notice concerning Yselmoor Partners, dated 16 April 2026. 2 pages, complete. Signed by the General Counsel.", "termination_clause_legal_opinion_yselmoor.pdf - Termination clause legal opinion concerning Yselmoor Partners, dated 24 April 2026. 5 pages, complete. Signed by external counsel."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 851}} {"id": "isc-te-00235-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Tarvcliff plc", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "1 June 2026"}, "checklist": ["Check for proof of deposit savings, issued within the last 3 months.", "Check for mortgage application form, issued within the last 3 months and signed.", "Check for property valuation report, issued within the last 3 months and signed.", "Check for gifted deposit letter, issued within the last 3 months and signed.", "If the property being bought is a flat in a shared building, also check for management company pack, issued within the last 3 months."], "submission": {"case": {"name": "Pablo Drumsall", "reference": "TQ-86071", "details": ["The property being bought is a flat in a shared building."]}, "documents received": ["Management company pack. Pack for the property being bought by Pablo Drumsall. Date of issue: 22 March 20217. 12 pages, complete.", "P60 tax summary. P60 in the name of Pablo Drumsall. Date of issue: 10 July 2025. 2 pages, complete.", "Gifted deposit letter. Letter regarding Pablo Drumsall. Date of issue: 17 May 2026. 1 page. Signed by the giftor.", "Proof of deposit savings. Statement in the name of Pablo Drumsall. Date of issue: 25 March 2026. 2 pages, complete.", "Mortgage application form. Application in the name of Pablo Drumsall. Date of issue: 3 April 2026. 10 pages, complete. Signed by the borrower.", "Property valuation report. Report prepared for Pablo Drumsall. Date of issue: 13 April 2026. 8 pages, complete. Signed by the valuer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 794}} {"id": "isc-te-00415-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Jaskmouth & Co", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "11 March 2026"}, "checklist": ["Childcare payment receipt, issued within the last 13 months.", "Rental income record.", "Gift aid donation summary.", "Tax return draft printout, signed.", "Pension contribution certificate, issued within the last 13 months.", "Employment income summary, issued within the last 13 months."], "submission": {"case": {"name": "household tax affairs MM-28293", "reference": "OJ-52114"}, "cover note": "I can confirm that a colleague has already checked this pack.", "documents received": ["Pension contribution certificate for household tax affairs MM-28293. Date of issue: 9 November 2025. 2 pages, complete.", "Childcare payment receipt for household tax affairs MM-28293. Date of issue: 5 February 2026. Single page.", "Gift aid donation summary for household tax affairs MM-28293. Date of issue: 10 December 2025. Single page.", "Rental income record for household tax affairs MM-28293. Date of issue: 6 December 2025. 4 pages, complete.", "Tax return draft printout for household tax affairs MM-28293. Date of issue: 10 December 2025. 6 pages, complete. Signed by the household's tax filer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 731}} {"id": "isc-te-00339-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Pellwood Ltd", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "4 May 2026"}, "checklist": ["Medical examination certificate, issued within the last 6 months and signed.", "Right to work share code printout, issued within the last 3 months.", "Licence application form, signed.", "If the applicant has lived at an address outside the country in the last five years, also: criminal record certificate from overseas, issued within the last 3 months.", "Photo driving licence, valid (not expired) on the date of the review.", "Passport style photograph, issued within the last 6 months."], "submission": {"case": {"name": "Manon Pimingham", "reference": "YV-79327", "details": ["The applicant has lived at the same address in the country for the last five years."]}, "documents received": ["Photo driving licence for Manon Pimingham. Expiry date 1 July 2027. 2 pages, complete.", "Right to work share code printout for Manon Pimingham. Dated 30 April 2026. Single page.", "Licence application form for Manon Pimingham. Dated 11 January 2026. 6 pages, complete. Signed by the applicant.", "Medical examination certificate for Manon Pimingham. Dated 15 December 2025. 2 pages, complete. Signed by the examining doctor.", "Passport style photograph for Manon Pimingham. Dated 9 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 731}} {"id": "isc-te-00425-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Zervstead plc", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "7 April 2026"}, "checklist": ["Support plan, signed", "Proof of identity, valid (not expired) on the date of the review", "Needs assessment report, signed", "Safeguarding referral form, issued within the last 12 months, signed", "If the adult owns property that could be considered in the financial assessment, also: property valuation report, issued within the last 12 months, signed", "Benefit entitlement letters, issued within the last 12 months"], "submission": {"case": {"name": "Emre Brodett", "reference": "QM-52065", "details": ["The adult does not own property that could be considered in the financial assessment."]}, "documents received": ["Proof of identity - Emre Brodett. The document shows an expiry date of 21 September 2026. It is a single page.", "Benefit entitlement letters - Emre Brodett. The letters are dated 22 November 2025. 2 pages, complete.", "Safeguarding referral form - Emre Brodett. The form is dated 16 November 2025. 2 pages, complete. It is signed by the safeguarding lead.", "Needs assessment report - Emre Brodett. The report is dated 27 January 2026. 12 pages, complete. It is signed by the assessing social worker.", "Support plan - Emre Brodett. The plan is dated 27 January 2026. 6 pages, complete. It is signed by the support planner.", "File QM-52065 attachment 7. The file will not open, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 785}} {"id": "isc-te-00407-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Morvwood plc", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "9 June 2026"}, "checklist": ["If the customer auditor requests access to sub-tier supplier records, also include: sub-tier supplier records summary (issued within the last 3 months, signed)", "layout tour plan (signed)", "previous audit findings closure file (signed)", "training matrix extract (issued within the last 3 months, signed)", "calibration status summary (issued within the last 1 months, signed)", "open corrective action list (issued within the last 1 months, signed)", "audit agenda (signed)"], "submission": {"case": {"name": "customer audit visit YO-54795", "reference": "YP-28673", "details": ["The customer auditor does not request access to sub-tier supplier records."]}, "cover note": "Please find attached the pack for customer audit visit YO-54795, reference YP-28673. Everything needed is attached and complete.", "documents received": ["Previous audit findings closure file for customer audit visit YO-54795, issued 12 April 2026. 6 pages, complete, signed by the quality manager.", "Document control list for customer audit visit YO-54795, issued 6 May 2026. 4 pages, complete, signed by the document controller.", "Training matrix extract for customer audit visit YO-54795. The date of issue is smudged and cannot be read. 3 pages, complete, signed by the training coordinator.", "Layout tour plan for customer audit visit YO-54795, issued 26 May 2026. Single page, signed by the quality manager.", "Audit scope statement for customer audit visit YO-54795, issued 12 March 2026. Single page, signed by the quality manager.", "Calibration status summary for customer audit visit YO-54795, issued 31 May 2026. 2 pages, complete, signed by the calibration lead.", "Audit agenda for customer audit visit YO-54795, issued 21 February 2026. Single page, signed by the quality manager.", "Open corrective action list for customer audit visit YO-54795, issued 24 May 2026. 2 pages, complete, signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack matches the checklist. Take each checklist line that applies to this case in turn. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete: every applicable line is met (extra documents do not matter). Choose incomplete: at least one applicable line is not met. Choose unclear: no line is clearly unmet, but at least one cannot be decide from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-20", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 928}} {"id": "isc-te-00169-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Vornmere Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "10 June 2026"}, "checklist": ["Loyalty scheme enrolment form (signed)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Nominated store preference form (signed)", "Initial points balance statement (issued within the last 3 months)", "Terms and conditions acceptance sheet (signed)"], "submission": {"case": {"name": "Emily Kipaker", "reference": "LI-14145", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Points transfer request for Emily Kipaker, dated 22 March 2026. A single page, signed by the member, Emily Kipaker.", "Initial points balance statement for Emily Kipaker, dated 6 April 2026. A single page.", "Loyalty scheme enrolment form for Emily Kipaker, dated 29 May 2026. A single page, signed by the member, Emily Kipaker.", "Terms and conditions acceptance sheet for Emily Kipaker, dated 1 March 2026. A single page, signed by the member, Emily Kipaker.", "File scan_0027.pdf. The file will not open, so its contents cannot be seen.", "Nominated store preference form for Emily Kipaker, dated 19 May 2026. A single page, signed by the member, Emily Kipaker."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 732}} {"id": "isc-te-00148-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Lombheim Ltd", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "1 June 2026"}, "checklist": ["Capital gains asset record", "Gift aid donation summary", "Rental income record", "Childcare payment receipt issued within the last 13 months", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Tax return draft printout, signed"], "submission": {"case": {"name": "household tax affairs ND-78453", "reference": "UP-21658", "details": ["The household sold a property other than its main home during the tax year."]}, "documents received": ["Gift aid donation summary for household tax affairs ND-78453, dated 20 May 2026. Single page.", "Capital gains asset record for household tax affairs ND-78453, dated 9 May 2026. 2 pages, complete.", "Rental income record for household tax affairs ND-78453, dated 5 May 2026. 4 pages, complete.", "Childcare payment receipt for household tax affairs ND-78453, dated 14 May 2026. Single page.", "Property disposal calculation sheet for household tax affairs ND-78453, dated 7 February 2026. 2 pages, complete. Signed by the household's tax filer.", "Tax return draft printout for household tax affairs ND-78453, dated 2 February 2026. 6 pages, complete. Signed by the household's tax filer.", "File scan_001: the scan is blank, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 778}} {"id": "isc-te-00298-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Holham Limited", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "9 June 2026"}, "checklist": ["Check that the pack contains the written grievance statement, signed.", "Check that the pack contains the witness list, signed.", "Check that the pack contains the meeting invitation with rights explained, issued within the last 1 months.", "Check that the pack contains the previous grievance outcome letter, issued within the last 24 months.", "Check that the pack contains the grievance procedure acknowledgement, issued within the last 3 months and signed."], "submission": {"case": {"name": "Amelia Ostford", "reference": "BI-54578"}, "documents received": ["Meeting invitation with rights explained, about Amelia Ostford, dated 26 May 2026. Single page.", "Grievance procedure acknowledgement about Amelia Ostford, dated 6 June 2026. Single page. Signed by Amelia Ostford.", "Adjustment request record about Amelia Ostford, dated 8 May 2026. Single page. Signed by the case administrator.", "Witness list about Amelia Ostford, dated 16 April 2026. Single page. Signed by Amelia Ostford.", "Written grievance statement about Amelia Ostford, dated 7 April 2026. 3 pages, complete. Signed by Amelia Ostford.", "Previous grievance outcome letter about Amelia Ostford, dated 27 March 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist. Go through every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete if every applicable line is met (extra documents do not matter). Choose incomplete if at least one applicable line is not met. Choose unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-30", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 728}} {"id": "isc-te-00105-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Oskcliff BV", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "16 April 2026"}, "checklist": ["Fraud screening result sheet issued within the last 3 months.", "Signature proof of delivery issued within the last 6 months and signed.", "Delivery confirmation issued within the last 6 months.", "Transaction record printout issued within the last 3 months.", "Chargeback response form, signed.", "Customer account details page issued within the last 3 months."], "submission": {"case": {"name": "disputed transaction EQ-46342", "reference": "VR-66300"}, "documents received": ["Customer order history extract - EQ-46342.pdf. A customer order history extract for disputed transaction EQ-46342, dated 27 November 2025. It is 2 pages, complete.", "Terms of sale acceptance log - EQ-46342.pdf. A single-page terms of sale acceptance log for disputed transaction EQ-46342, issued on 13 June 2025.", "Transaction record printout - EQ-46342.pdf. A single-page transaction record printout for disputed transaction EQ-46342, issued on 26 March 2026.", "Customer account details page - EQ-46342.pdf. A one-page customer account details page for disputed transaction EQ-46342, with its date of issue shown as 4 April 2026.", "Fraud screening result sheet - EQ-46342.pdf. A single-page fraud screening result sheet for disputed transaction EQ-46342, dated 14 February 2026.", "Chargeback response form - EQ-46342.pdf. A chargeback response form for disputed transaction EQ-46342, dated 14 January 2026. It runs to 2 pages, complete, and is signed by the payments disputes team lead.", "Delivery confirmation - EQ-46342.pdf. A one-page delivery confirmation for disputed transaction EQ-46342, showing its date of issue as 29 November 2025."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 870}} {"id": "isc-te-00321-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Elstheim & Co", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "25 March 2026"}, "checklist": ["Two-factor authentication confirmation, issued within the last 3 months", "Account purpose statement", "Account closure procedure", "If the account will be run by an external agency, also: agency access agreement, signed", "Platform terms acceptance record, signed", "Naming convention approval, signed", "Account request form, signed"], "submission": {"case": {"name": "new social media account XI-38854", "reference": "TG-11955", "details": ["The account will be run entirely by in-house staff."]}, "documents received": ["naming_convention_approval_XI-38854.pdf — A naming convention approval for new social media account XI-38854, dated 15 March 2026. It is signed by the brand governance lead and is a single page.", "two_factor_authentication_confirmation_XI-38854.pdf — A two-factor authentication confirmation for new social media account XI-38854, dated 23 March 2026. It is a single page.", "password_policy_XI-38854.pdf — A password policy document for new social media account XI-38854, dated 23 March 2026. It is a single page.", "account_purpose_statement_XI-38854.pdf — An account purpose statement for new social media account XI-38854, dated 3 March 2026. It is a single page.", "account_request_form_XI-38854.pdf — An account request form for new social media account XI-38854, dated 19 January 2026. It is signed by the requesting marketing manager and is a single page.", "admin_access_list_XI-38854.pdf — An admin access list for new social media account XI-38854, dated 10 February 2026. It is a single page.", "platform_terms_acceptance_record_XI-38854.pdf — A platform terms acceptance record for new social media account XI-38854, dated 31 January 2026. It is signed by the account owner and is a single page.", "content_escalation_route_XI-38854.pdf — A content escalation route for new social media account XI-38854, dated 1 March 2026. It is signed by the social media governance team lead and is a single page.", "account_closure_procedure_XI-38854.pdf — An account closure procedure for new social media account XI-38854, dated 7 December 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1011}} {"id": "isc-te-00300-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jorheim Inc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "29 June 2026"}, "checklist": ["Photographs of the spillage on the floor, issued within the last 1 months.", "Witness statement from a staff member, signed.", "Staff training record for the duty manager, issued within the last 24 months and signed.", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed.", "CCTV footage stills of the incident, issued within the last 3 months.", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed.", "Public liability insurance schedule."], "submission": {"case": {"name": "Dravfeld SAS", "reference": "WO-22645", "details": ["The injured customer did not go to hospital.", "The customer is handling the claim personally."]}, "documents received": ["Witness statement from a staff member - Dravfeld SAS.pdf. The statement from a staff member at Dravfeld SAS is dated 4 April 2026 and is 1 page. It is signed by the staff witness.", "Photographs of the spillage on the floor - Dravfeld SAS.pdf. The photographs show the spillage on the floor at Dravfeld SAS, with a date of issue of 18 June 2026. 1 page.", "Public liability insurance schedule - Dravfeld SAS.pdf. The schedule for Dravfeld SAS shows a date of issue of 23 April 2026. 4 pages, complete.", "CCTV footage stills of the incident - Dravfeld SAS.pdf. The stills from the CCTV footage of the incident at Dravfeld SAS show a date of issue of 19 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00351-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vaskfield Partners", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "10 September 2026"}, "checklist": ["Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Root cause analysis report, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Alerting rules review note, issued within the last 3 months."], "submission": {"case": {"name": "production incident MR-6892", "reference": "GL-79533"}, "documents received": ["On-call duty roster for the month of the incident, production incident MR-6892, dated 19 August 2026. 3 pages, complete.", "Alerting rules review note for production incident MR-6892, dated 15 August 2026. 2 pages, complete.", "Root cause analysis report on production incident MR-6892, dated 24 July 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Follow-up owner assignment sheet for production incident MR-6892, dated 23 August 2026. Single page, signed by the reliability engineering lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 662}} {"id": "isc-te-00474-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Belmdale Partners", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "4 May 2026"}, "checklist": ["New floor snagging list, issued within the last 1 months and signed", "Movers insurance certificate, valid (not expired) on the date of the review", "Crate hire agreement, signed", "IT decommissioning certificate, issued within the last 1 months and signed", "If the move includes taking furniture to a storage unit, also: storage unit access authorisation, signed", "Signed move plan", "Furniture inventory list, issued within the last 1 months and signed"], "submission": {"case": {"name": "office move project ID-94583", "reference": "DM-22219"}, "documents received": ["Furniture inventory list ID-94583.pdf — Furniture inventory list for office move project ID-94583, dated 29 April 2026. 4 pages, complete. Signed by the facilities manager.", "Move plan ID-94583.pdf — Signed move plan for office move project ID-94583, dated 17 February 2026. 6 pages, complete. Signed by the move project manager.", "IT decommissioning certificate ID-94583.pdf — IT decommissioning certificate for office move project ID-94583, dated 29 April 2026. Single page. Signed by the IT manager.", "Crate hire agreement ID-94583.pdf — Crate hire agreement for office move project ID-94583, dated 7 February 2026. 2 pages, complete. Signed by the crate hire supplier.", "New floor snagging list ID-94583.pdf — New floor snagging list for office move project ID-94583, dated 17 April 2026. 3 pages, complete. Signed by the site manager.", "Movers insurance certificate ID-94583.pdf — Movers insurance certificate for office move project ID-94583. Shows an expiry date of 8 April 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 867}} {"id": "isc-te-00320-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Hondwick plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "9 September 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "If the account will be run by an external agency, also: agency access agreement (signed)", "Account request form (signed)", "Account purpose statement", "Naming convention approval (signed)", "Platform terms acceptance record (signed)"], "submission": {"case": {"name": "new social media account ZP-18379", "reference": "MR-88769", "details": ["The account will be run by an external agency."]}, "documents received": ["Account purpose statement - ZP-18379.pdf. An account purpose statement for new social media account ZP-18379, dated 14 July 2026. It is a single page.", "Admin access list - ZP-18379.pdf. An admin access list for new social media account ZP-18379, dated 14 August 2026. It is a single page.", "Agency access agreement - ZP-18379.pdf. An agency access agreement for new social media account ZP-18379, dated 15 August 2026. 2 pages, complete. It is signed by the agency's account director.", "Naming convention approval - ZP-18379.pdf. A naming convention approval for new social media account ZP-18379, dated 5 August 2026, on a single page. It is signed by the social media governance lead.", "Account request form - ZP-18379.pdf. An account request form for new social media account ZP-18379, dated 23 June 2026, on a single page. It is signed by the requesting marketing manager.", "Platform terms acceptance record - ZP-18379.pdf. A platform terms acceptance record for new social media account ZP-18379, dated 24 August 2026, on a single page. It is signed by the account administrator."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist. Work through every checklist line that applies to this case. Only a document that is the kind listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows counts as satisfying a required document. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-48", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 876}} {"id": "isc-te-00137-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Fravmouth Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "15 July 2026"}, "checklist": ["Supplier quality questionnaire, issued within the last 12 months, signed.", "Supplier self-assessment report, issued within the last 12 months, signed.", "If the supplier provides parts that are safety-critical, also: process failure mode and effects analysis, signed.", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months, signed.", "Supplier audit report, issued within the last 24 months, signed.", "Financial stability statement, issued within the last 12 months, signed.", "Supplier capacity declaration, issued within the last 12 months, signed.", "Raw material certificate of analysis, issued within the last 6 months, signed."], "submission": {"case": {"name": "Mersley SAS", "reference": "XW-63469", "details": ["The supplier provides parts that are safety-critical.", "The supplier subcontracts part of the production."]}, "cover note": "I am sorry that this pack had to be put together in a rush. Kind regards, Anna Stanell", "documents received": ["Supplier quality questionnaire, Mersley SAS. Date of issue: 21 June 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Supplier audit report, Mersley SAS. Date of issue: 19 March 2025. 8 pages, complete. Signed by the lead auditor.", "Process failure mode and effects analysis, Mersley SAS. Date of issue: 1 June 2026. 9 pages, complete. Signed by the supplier's process engineer.", "Financial stability statement, Mersley SAS. Date of issue: 7 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Supplier self-assessment report, Mersley SAS. Date of issue: 18 October 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Supplier capacity declaration, Mersley SAS. Date of issue: 3 August 2025. 2 pages, complete. Signed by the supplier's operations manager.", "Subcontractor approval record, Mersley SAS. Date of issue: 9 August 2025. 2 pages, complete. Signed by the supplier's quality manager.", "Raw material certificate of analysis, Mersley SAS. Date of issue: 22 April 2026. 2 pages, complete. Signed by the supplier's laboratory manager."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "variant-50", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 970}} {"id": "isc-te-00040-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Delvham BV", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "12 May 2026"}, "checklist": ["Seal number log, issued within the last 1 months and signed", "Load consolidation sheet, issued within the last 3 months and signed", "Cross-dock slot booking sheet, issued within the last 1 months and signed", "Outbound loading record, issued within the last 1 months and signed"], "submission": {"case": {"name": "cross-dock transfer QC-37927", "reference": "WU-40761"}, "documents received": ["Transfer manifest for cross-dock transfer QC-37927, dated 23 April 2026. 3 pages, complete, signed by the transfer coordinator.", "Damaged goods exception sheet for cross-dock transfer QC-37927, dated 23 April 2026. Single page, signed by the warehouse shift lead.", "Cross-dock slot booking sheet for cross-dock transfer QC-37927, dated 26 April 2026. Single page, signed by the slot booking coordinator.", "Seal number log for cross-dock transfer QC-37927, dated 2 May 2026. Single page, signed by the dispatch supervisor.", "Outbound loading record for cross-dock transfer QC-37927, dated 29 April 2026. Single page, signed by the outbound loading supervisor.", "Load consolidation sheet for cross-dock transfer QC-37927, dated 9 March 2026. 2 pages, complete, signed by the load planner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00474-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Belmdale Partners", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "4 May 2026"}, "checklist": ["New floor snagging list, issued within the last 1 months and signed", "Movers insurance certificate, valid (not expired) on the date of the review", "Crate hire agreement, signed", "IT decommissioning certificate, issued within the last 1 months and signed", "If the move includes taking furniture to a storage unit, also: storage unit access authorisation, signed", "Signed move plan", "Furniture inventory list, issued within the last 1 months and signed"], "submission": {"case": {"name": "office move project ID-94583", "reference": "DM-22219", "details": ["The move includes taking furniture to a storage unit."]}, "documents received": ["Movers insurance certificate ID-94583.pdf — Movers insurance certificate for office move project ID-94583. Shows an expiry date of 8 April 2027. Single page.", "Move plan ID-94583.pdf — Signed move plan for office move project ID-94583, dated 17 February 2026. 6 pages, complete. Signed by the move project manager.", "Furniture inventory list ID-94583.pdf — Furniture inventory list for office move project ID-94583, dated 29 April 2026. 4 pages, complete. Signed by the facilities manager.", "Lifting equipment inspection report ID-94583.pdf — Lifting equipment inspection report for office move project ID-94583, dated 25 April 2026. 2 pages, complete. Signed by the lifting equipment inspector.", "Crate hire agreement ID-94583.pdf — Crate hire agreement for office move project ID-94583, dated 7 February 2026. 2 pages, complete. Signed by the crate hire supplier.", "IT decommissioning certificate ID-94583.pdf — IT decommissioning certificate for office move project ID-94583, dated 29 April 2026. Single page. Signed by the IT manager.", "New floor snagging list ID-94583.pdf — New floor snagging list for office move project ID-94583, dated 17 April 2026. 3 pages, complete. Signed by the site manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 938}} {"id": "isc-te-00021-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Veybrook Group", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "18 March 2026"}, "checklist": ["Movers insurance certificate, valid (not expired) on the date of the review.", "Furniture inventory list, issued within the last 1 months, signed.", "New floor snagging list, issued within the last 1 months, signed.", "Lifting equipment inspection report, issued within the last 6 months, signed.", "Signed move plan, signed.", "Parking bay suspension approval, issued within the last 1 months, signed."], "submission": {"case": {"name": "office move project LO-48164", "reference": "TD-37447"}, "documents received": ["Movers insurance certificate for office move project LO-48164. It shows its expiry date as 7 October 2027. It is a single page.", "Draft move plan with no approval signature for office move project LO-48164. It shows its date of issue as 22 February 2026. It is 6 pages, complete. It is signed by the move project manager.", "Signed move plan for office move project LO-48164. It shows its date of issue as 22 February 2026. It is 6 pages, complete. It is signed by the move project manager.", "Furniture inventory list for office move project LO-48164. It shows its date of issue as 4 March 2026. It is 4 pages, complete. It is signed by the facilities coordinator.", "Lifting equipment inspection report for office move project LO-48164. It shows its date of issue as 13 January 2026. It is 2 pages, complete. It is signed by the lifting equipment inspector.", "New floor snagging list for office move project LO-48164. It shows its date of issue as 14 March 2026. It is 3 pages, complete. It is signed by the site inspector.", "Parking bay suspension approval for office move project LO-48164. It shows its date of issue as 1 March 2026. It is a single page. It is signed by the highways officer."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every line of the checklist that applies here. A required document only counts if it is the type of document listed (not a similar type), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it had not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-1", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 894}} {"id": "isc-te-00473-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Uldberg Partners", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "21 May 2026"}, "checklist": ["Planned completion date sheet, signed.", "Access authorisation slip, signed.", "If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Parts order confirmation, issued within the last 1 months.", "Photographs of the fault, issued within the last 3 months.", "Job request form, signed."], "submission": {"case": {"name": "maintenance request NO-34425", "reference": "UR-51642", "details": ["The job involves working at height above two metres."]}, "documents received": ["Job request form for maintenance request NO-34425. Dated 3 February 2026. 1 page. The signature line is empty; the form is not signed.", "Parts order confirmation for maintenance request NO-34425. Dated 5 May 2026. 1 page.", "Photographs of the fault for maintenance request NO-34425. Dated 24 March 2026. 2 pages, complete.", "Access authorisation slip for maintenance request NO-34425. Dated 9 May 2026. 1 page. Signed by the site access coordinator.", "Permit to work at height for maintenance request NO-34425. Dated 1 May 2026. 1 page. Signed by the issuing supervisor.", "Planned completion date sheet for maintenance request NO-34425. Dated 21 February 2026. 1 page. Signed by the facilities manager."]}}, "question": {"type": "choice", "instructions": "Ask yourself: does the pack match the checklist? Review each line of the checklist that is relevant to this case. A required document only counts if it is the kind of document the list names (not a similar one), is about the case subject, has all its pages, is signed in every place the checklist asks for a signature, was not expired on the review date, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for this case. complete: all applicable lines are met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one line cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-61", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 781}} {"id": "isc-te-00187-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Baxwyn Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "27 July 2026"}, "checklist": ["If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer (issued within the last 3 months)", "depreciation schedule for the asset to date", "sales invoice or receipt for the sale proceeds (issued within the last 3 months)", "profit or loss on disposal calculation (signed)", "board or budget holder approval for the disposal (signed)"], "submission": {"case": {"name": "disposed asset NB-8361", "reference": "QR-52405", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Depreciation schedule for the asset to date, dated 5 June 2026, for disposed asset NB-8361. 2 pages, complete.", "File scan_0147.pdf. The file will not open, so its contents cannot be seen.", "Part-exchange valuation from the dealer, dated 29 May 2026, for disposed asset NB-8361. 1 page.", "Sales invoice or receipt for the sale proceeds, dated 13 May 2026, for disposed asset NB-8361. 1 page.", "Board or budget holder approval for the disposal, dated 5 April 2026, for disposed asset NB-8361. 1 page. It is signed by the budget holder.", "Profit or loss on disposal calculation, dated 20 July 2026, for disposed asset NB-8361. 1 page. It is signed by the group financial controller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 765}} {"id": "isc-te-00159-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Dornwell Limited", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "3 June 2026"}, "checklist": ["Benefit claim form, valid (not expired) on the date of the review and signed", "Recent bank statements, issued within the last 2 months", "Proof of savings, issued within the last 2 months", "If the claimant is living in temporary accommodation arranged by the council, also: temporary accommodation placement letter", "Proof of identity, valid (not expired) on the date of the review", "Rent book or rent payment schedule, issued within the last 2 months"], "submission": {"case": {"name": "Seren Wadow", "reference": "SW-66484", "details": ["The claimant is living in temporary accommodation arranged by the council."]}, "documents received": ["File name: scan_0442.pdf. The contents cannot be seen; the scan is blank and too faint to read.", "Proof of savings for Seren Wadow. Date of issue: 26 May 2026. 2 pages, complete.", "Benefit claim form for Seren Wadow. Expiry date shown: 1 January 2027. 12 pages, complete. Signed by the claimant.", "Current tenancy agreement for Seren Wadow. Date of issue: 6 March 2026. 12 pages, complete. Signed by the landlord.", "Proof of identity for Seren Wadow. Expiry date shown: 29 August 2027. Single page.", "Rent book or rent payment schedule for Seren Wadow. Date of issue: 13 April 2026. 4 pages, complete.", "Recent bank statements for Seren Wadow. Date of issue: 25 May 2026. 12 pages, complete.", "Proof of national insurance number for Seren Wadow. Date of issue: 15 March 2026. Single page.", "Temporary accommodation placement letter for Seren Wadow. Date of issue: 24 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "conditional", "defect": "document present (circumstance holds), plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 847}} {"id": "isc-te-00074-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Jordale plc", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "12 March 2026"}, "checklist": ["If the equipment is above the major purchase threshold, also include: tender waiver justification (signed)", "Equipment purchase request form (signed)", "Installation requirements note", "Cost-benefit justification", "Training needs assessment (signed)", "Grant fund eligibility note (signed, issued within the last 6 months)"], "submission": {"case": {"name": "equipment EZ-12088", "reference": "RL-72447"}, "documents received": ["Installation requirements note for equipment EZ-12088, dated 8 February 2026. 2 pages, complete.", "Equipment purchase request form for equipment EZ-12088, dated 12 November 2025. 2 pages, complete. Signed by the requesting Department Head.", "Grant fund eligibility note for equipment EZ-12088, dated 9 February 2026. 1 page. Signed by the Research Funding Officer.", "Vendor quotation for equipment EZ-12088, dated 7 January 2026. 2 pages, complete.", "Training needs assessment for equipment EZ-12088, dated 13 November 2025. 1 page. Signed by the Training Manager.", "Cost-benefit justification for equipment EZ-12088, dated 23 December 2025. 3 pages, complete."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 526}} {"id": "isc-te-00010-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ilvwell & Co", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "17 June 2026"}, "checklist": ["Confirmation of contact details, issued within the last 3 months, is on file.", "Signed delivery address confirmation is on file.", "Signed signature verification record is on file.", "Signed fraud questionnaire is on file."], "submission": {"case": {"name": "Femke Gadstad", "reference": "XS-17516"}, "cover note": "I am sorry that this pack was put together in a rush. Please let me know if anything needs a second look.", "documents received": ["Confirmation of contact details - Femke Gadstad.pdf. Confirmation of contact details for Femke Gadstad, issued on 20 April 2026. It is 1 page.", "Fraud questionnaire - Femke Gadstad.pdf. Fraud questionnaire for Femke Gadstad, issued on 30 April 2026. It is 2 pages, complete, and signed by the cardholder.", "Signature verification record - Femke Gadstad.pdf. Signature verification record for Femke Gadstad, issued on 25 February 2026. It is 1 page and signed by the card services officer.", "Delivery address confirmation - Femke Gadstad.pdf. Delivery address confirmation for Femke Gadstad, issued on 1 June 2026. It is 1 page and signed by the cardholder.", "Photo identification - Femke Gadstad.pdf. Photo identification for Femke Gadstad, expiring on 21 July 2027. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Review every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "variant-71", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 738}} {"id": "isc-te-00385-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Cindlund SAS", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "14 May 2026"}, "checklist": ["Flexible working request form, signed", "Trial period proposal, signed", "Line manager opinion note, signed, issued within the last 2 months", "Proposed working pattern plan, signed", "Impact assessment on the team, signed"], "submission": {"case": {"name": "Michael Pimisey", "reference": "TK-36304"}, "documents received": ["Proposed working pattern plan for Michael Pimisey, dated 27 March 2026, 2 pages, complete, signed by the employee.", "Flexible working request form for Michael Pimisey, dated 22 April 2026, 3 pages, complete, signed by the employee.", "Line manager opinion note for Michael Pimisey, dated 10 May 2026, 2 pages, complete, signed by the line manager.", "Impact assessment on the team for Michael Pimisey, dated 1 February 2026, 3 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 636}} {"id": "isc-te-00318-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Trelvale plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "29 April 2026"}, "checklist": ["Supplier self-assessment report, issued within the last 12 months, signed", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months, signed", "Raw material certificate of analysis, issued within the last 6 months, signed", "Certified quality management system certificate, valid (not expired) on the date of the review", "Supplier quality questionnaire, issued within the last 12 months, signed", "Supplier audit report, issued within the last 24 months, signed"], "submission": {"case": {"name": "Raskmoor Partners", "reference": "UB-25706", "details": ["The supplier subcontracts part of the production."]}, "cover note": "Everything needed is attached and complete.", "documents received": ["Scanned subcontractor approval record for Raskmoor Partners, dated 26 April 2026. 2 pages, complete. Signed by the supplier's operations manager.", "Scanned supplier audit report for Raskmoor Partners, dated 9 May 2025. 8 pages, complete. Signed by the lead auditor.", "Scanned raw material certificate of analysis for Raskmoor Partners, dated 23 February 2026. 2 pages, complete. The area of the last page where the signature would appear is covered by a sticky note, so it is not known whether the document is signed.", "Scanned supplier quality questionnaire for Raskmoor Partners, dated 15 July 2025. 4 pages, complete. Signed by the supplier's quality manager.", "Scanned certified quality management system certificate for Raskmoor Partners, showing an expiry date of 23 January 2027. Single page.", "Scanned supplier self-assessment report for Raskmoor Partners, dated 24 October 2025. 6 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 838}} {"id": "isc-te-00105-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Oskcliff BV", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "16 April 2026"}, "checklist": ["Fraud screening result sheet issued within the last 3 months.", "Signature proof of delivery issued within the last 6 months and signed.", "Delivery confirmation issued within the last 6 months.", "Transaction record printout issued within the last 3 months.", "Chargeback response form, signed.", "Customer account details page issued within the last 3 months."], "submission": {"case": {"name": "disputed transaction EQ-46342", "reference": "VR-66300"}, "cover note": "I have put this pack together for your review, but I am not certain that everything needed is included. Please let me know if anything further is required.", "documents received": ["Transaction record printout - EQ-46342.pdf. A single-page transaction record printout for disputed transaction EQ-46342, issued on 26 March 2026.", "Customer account details page - EQ-46342.pdf. A one-page customer account details page for disputed transaction EQ-46342, with its date of issue shown as 4 April 2026.", "Delivery confirmation - EQ-46342.pdf. A one-page delivery confirmation for disputed transaction EQ-46342, showing its date of issue as 29 November 2025.", "Fraud screening result sheet - EQ-46342.pdf. A single-page fraud screening result sheet for disputed transaction EQ-46342, dated 14 February 2026.", "Signature proof of delivery - EQ-46342.pdf. A one-page signature proof of delivery for disputed transaction EQ-46342, showing its date of issue as 12 January 2026. It is signed by the delivery driver.", "Chargeback response form - EQ-46342.pdf. A chargeback response form for disputed transaction EQ-46342, dated 14 January 2026. It runs to 2 pages, complete, and is signed by the payments disputes team lead."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist: is it complete? Work through each line of the checklist that applies to this case. A required document only counts when it is the kind of document listed (not a similar one), concerns the subject of the case, has all its pages, is signed wherever the checklist requires a signature, had not expired on the date of the review, and was issued inside the period the checklist allows. A conditional line applies only if its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-44", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 874}} {"id": "isc-te-00054-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Hondhurst Inc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "11 March 2026"}, "checklist": ["Flammability test certificate, issued within the last 12 months", "Kit contents list", "Kit cost breakdown, issued within the last 3 months and signed", "If the kit includes an electrical display unit, also: electrical safety test certificate, issued within the last 12 months", "Brand colour specification", "Shipping manifest, issued within the last 1 months", "Waste disposal plan"], "submission": {"case": {"name": "merchandising kit XM-57664", "reference": "OC-82346", "details": ["The kit includes an electrical display unit."]}, "cover note": "Please find attached the pack for merchandising kit XM-57664. Everything needed is attached and complete. — Emily Quillescu", "documents received": ["XM-57664 kit contents list.pdf — A kit contents list for merchandising kit XM-57664, dated 16 November 2025. 2 pages, complete.", "XM-57664 point of sale design proof.pdf — A point of sale design proof for merchandising kit XM-57664, dated 16 December 2025. 4 pages, complete. It is signed by the design lead.", "XM-57664 shipping manifest.pdf — A shipping manifest for merchandising kit XM-57664, dated 7 March 2026. 2 pages, complete.", "XM-57664 flammability test certificate.pdf — A flammability test certificate for merchandising kit XM-57664, dated 23 October 2025. It is a single page.", "XM-57664 waste disposal plan.pdf — A waste disposal plan for merchandising kit XM-57664, dated 23 January 2026. It is a single page.", "XM-57664 brand colour specification.pdf — A brand colour specification for merchandising kit XM-57664, dated 14 December 2025. It is a single page.", "XM-57664 kit cost breakdown.pdf — A kit cost breakdown for merchandising kit XM-57664, dated 2 February 2026. 2 pages, complete. It is signed by the finance manager."]}}, "question": {"type": "choice", "instructions": "The task is to decide whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete if every applicable line is met (extra documents do not matter). Answer incomplete if at least one applicable line is not met. Answer unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-70", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 949}} {"id": "isc-te-00380-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Weskthorpe LLP", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "18 May 2026"}, "checklist": ["Plant room access sign-in sheet.", "Asset condition photograph sheet, issued within the last 1 months.", "If the system contains more than 5 tonnes of refrigerant, also: fixed leak detection test certificate, issued within the last 6 months, signed.", "Refrigerant top-up log, issued within the last 1 months, signed.", "System pressure test results, issued within the last 1 months, signed."], "submission": {"case": {"name": "air conditioning system SP-87357", "reference": "XS-20787", "details": ["The system contains 5 tonnes of refrigerant or less."]}, "documents received": ["Asset condition photograph sheet for air conditioning system SP-87357. Dated 9 May 2026. 2 pages, complete.", "Plant room access sign-in sheet for air conditioning system SP-87357. Dated 24 April 2026. 1 page.", "System pressure test results for air conditioning system SP-87357. Dated 8 May 2026. 2 pages, complete. Signed by the commissioning engineer.", "Refrigerant top-up log for air conditioning system SP-87357. Dated 5 May 2026. 1 page. Signed by the refrigeration engineer."]}}, "question": {"type": "choice", "instructions": "The decision required is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-67", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 724}} {"id": "isc-te-00179-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Corvmark Group", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "10 July 2026"}, "checklist": ["Booking voucher, issued within the last 6 months.", "Fuel policy sheet, signed.", "If the named driver is under 25 years old, also: young driver surcharge agreement, signed.", "Driving licence, valid (not expired) on the date of the review, signed.", "Credit card in the driver's name, valid (not expired) on the date of the review, signed.", "Vehicle condition report, signed."], "submission": {"case": {"name": "Rachel Wraxstow", "reference": "FI-32246", "details": ["The named driver is 25 or older."]}, "cover note": "I am sorry that this pack was put together in a rush. I hope it reaches you in good order.", "documents received": ["Booking voucher for Rachel Wraxstow, dated 8 May 2026. Single page.", "Credit card in the driver's name for Rachel Wraxstow, expiry date 7 September 2027. Signed by Rachel Wraxstow. Single page.", "Vehicle condition report for Rachel Wraxstow, dated 21 May 2026. 2 pages, complete. Signed by Rachel Wraxstow.", "Additional driver authorisation form for Rachel Wraxstow, dated 10 May 2026. Signed by Rachel Wraxstow. Single page.", "Passport for Rachel Wraxstow, expiry date 12 February 2028. Signed by Rachel Wraxstow. Single page.", "Driving licence for Rachel Wraxstow, expiry date 5 September 2027. 2 pages, complete. Signed by Rachel Wraxstow.", "File scan_ref_08.pdf: the file will not open, so its contents cannot be seen.", "Fuel policy sheet for Rachel Wraxstow, dated 15 April 2026. Signed by Rachel Wraxstow. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 838}} {"id": "isc-te-00492-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Creskdale plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "4 March 2026"}, "checklist": ["Trade account application form, signed", "Credit reference agency report issued within the last 3 months", "Company registration certificate", "Credit limit approval memo issued within the last 1 months and signed", "If the customer requests a credit limit above the standard cap, also: finance director sanction letter issued within the last 1 months and signed"], "submission": {"case": {"name": "Dornmont LLP", "reference": "TD-47006", "details": ["The customer requests a credit limit above the standard cap."]}, "documents received": ["Trade account application form for Dornmont LLP, dated 1 January 2026. 3 pages, complete. Signed by the customer's authorised signatory.", "Credit limit approval memo for Dornmont LLP, dated 19 February 2026. Single page. Signed by the credit control manager.", "Finance director sanction letter for Dornmont LLP, dated 18 February 2026. Single page. Signed by the finance director.", "Credit reference agency report on Dornmont LLP, dated 3 March 2025. 6 pages, complete.", "Bank reference letter for Dornmont LLP, dated 15 September 2025. Single page. Signed by the bank manager.", "Company registration certificate for Dornmont LLP, dated 7 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 716}} {"id": "isc-te-00072-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Kenvgate Ltd", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "24 March 2026"}, "checklist": ["Equipment purchase request form, signed.", "Installation requirements note.", "Cost-benefit justification.", "If the equipment uses radioactive sources, also: radiation licence valid (not expired) on the date of the review.", "Training needs assessment, signed.", "Three quotes comparison sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "equipment US-49139", "reference": "LH-38443", "details": ["The equipment uses radioactive sources."]}, "cover note": "Please could you approve this quickly, as all the paperwork is in order. Happy to answer any questions in the meantime.", "documents received": ["Scanned equipment purchase request form for equipment US-49139, dated 23 January 2026, signed by the requesting department head. 2 pages, complete.", "Scanned three quotes comparison sheet for equipment US-49139, dated 20 December 2025, signed by the procurement officer. Single page.", "Scanned installation requirements note for equipment US-49139, dated 7 December 2025. 2 pages, complete.", "Scanned radiation licence for equipment US-49139, showing an expiry date of 29 January 2028. Single page.", "Scanned vendor quotation for equipment US-49139, dated 9 March 2026. 2 pages, complete.", "Scanned training needs assessment for equipment US-49139, dated 12 February 2026, signed by the training coordinator. Single page.", "Scanned cost-benefit justification for equipment US-49139, dated 8 December 2025. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist. Go through every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete if every applicable line is met (extra documents do not matter). Choose incomplete if at least one applicable line is not met. Choose unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-30", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 817}} {"id": "isc-te-00079-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Fervridge Partners", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "2 March 2026"}, "checklist": ["Payment gateway technical specification: all pages included.", "Fraud screening configuration sheet: signed.", "Gateway integration request form: signed.", "Data protection impact assessment: issued within the last 12 months, signed.", "Go-live sign-off certificate: issued within the last 1 months, signed.", "Merchant account agreement: signed.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review."], "submission": {"case": {"name": "payment gateway XI-37260", "reference": "SY-57899", "details": ["The gateway will not store customers' card details."]}, "documents received": ["Payment gateway technical specification for payment gateway XI-37260. Date of issue: 5 January 2026. 8 pages, complete.", "Fraud screening configuration sheet for payment gateway XI-37260. Date of issue: 14 November 2025. Single page, signed by the fraud screening administrator.", "Gateway integration request form for payment gateway XI-37260. Date of issue: 18 January 2026. 2 pages, complete, signed by the requesting merchant manager.", "Go-live sign-off certificate for payment gateway XI-37260. Date of issue: 21 February 2026. Single page, signed by the payments operations manager.", "Test environment transaction log for payment gateway XI-37260. Date of issue: 16 February 2026. 4 pages, complete.", "Data protection impact assessment for payment gateway XI-37260. Date of issue: 26 August 2025. 5 pages, complete, signed by the data protection officer.", "Merchant account agreement for payment gateway XI-37260. Date of issue: 2 February 2026. 6 pages, complete, signed by the merchant account holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 850}} {"id": "isc-te-00338-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Tarvvik SAS", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "7 September 2026"}, "checklist": ["Capacity assessment record, signed", "Proof of identity, valid (not expired) on the date of the review", "Safeguarding referral form, issued within the last 12 months, signed", "Support plan, signed"], "submission": {"case": {"name": "Claire Rumow", "reference": "KD-98368"}, "cover note": "Please find attached everything needed for this pack. It is all complete and ready for review.", "documents received": ["Proof of identity for Claire Rumow. The expiry date shown is 5 October 2027. It is a single page.", "Safeguarding referral form for Claire Rumow, dated 20 July 2026. All 2 of its 2 pages are included (2 pages, complete). Signed by the referring officer.", "Support plan for Claire Rumow, dated 28 July 2026. All 6 of its 6 pages are included (6 pages, complete). Signed by the care coordinator.", "Financial assessment form for Claire Rumow, dated 7 July 2026. All 6 of its 6 pages are included (6 pages, complete). Signed by the financial assessment officer.", "Capacity assessment record for Claire Rumow, dated 30 July 2026. Only 1 of its 4 pages is included (pages 1-1 of 4). Signed by the assessing practitioner.", "Benefit entitlement letters about Claire Rumow, dated 14 July 2026. All 2 of its 2 pages are included (2 pages, complete)."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 766}} {"id": "isc-te-00453-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Tondbrook BV", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "20 July 2026"}, "checklist": ["Signed leaver notification form.", "Signed shared mailbox handover record, issued within the last 1 months.", "Signed final payroll cut-off note, issued within the last 1 months.", "If the leaver held privileged administrator accounts, also: signed privileged account revocation certificate, issued within the last 1 months.", "If the leaver is moving to a competitor, also: signed confidential data removal attestation, issued within the last 1 months.", "Signed non-disclosure reminder acknowledgement."], "submission": {"case": {"name": "Samuel Ingins", "reference": "QD-28899", "details": ["The leaver held no privileged administrator accounts.", "The leaver is moving to a competitor."]}, "cover note": "Please find attached the complete pack for reference QD-28899. Everything needed is attached and complete, so the review can go ahead.", "documents received": ["shared-mailbox-handover-record-ingins-copy.pdf - Shared mailbox handover record for Samuel Ingins, dated 18 July 2026. Pages 1-1 of 2. Signed by the IT service desk manager.", "confidential-data-removal-attestation-ingins.pdf - Confidential data removal attestation for Samuel Ingins, dated 4 July 2026. Single page. Signed by the information security officer.", "final-payroll-cut-off-note-ingins.pdf - Final payroll cut-off note for Samuel Ingins, dated 13 July 2026. Single page. Signed by the payroll officer.", "leaver-notification-form-ingins.pdf - Leaver notification form for Samuel Ingins, dated 24 May 2026. 2 pages, complete. Signed by the line manager.", "non-disclosure-reminder-acknowledgement-ingins.pdf - Non-disclosure reminder acknowledgement for Samuel Ingins, dated 12 July 2026. Single page. Signed by Samuel Ingins."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00030-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Orrburg Limited", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "12 June 2026"}, "checklist": ["Utility supplier's letter confirming the supply was cut off (issued within the last 12 months)", "Drying contractor's certificate of completion (issued within the last 6 months, signed)", "Flood claim form (signed)", "Only if this applies: 'The flood water reached the upper floor of the property': upper floor damage schedule (signed)", "Photographs of flood water in the rooms (issued within the last 1 months)"], "submission": {"case": {"name": "property AU-50577", "reference": "EO-64610", "details": ["The flood water stayed at ground floor level."]}, "documents received": ["AU-50577_drying_contractors_certificate_of_completion.pdf. Drying contractor's certificate of completion for property AU-50577, dated 11 January 2026. 2 pages, complete. Signed by the drying contractor.", "AU-50577_loss_adjusters_inspection_report.pdf. Loss adjuster's inspection report for property AU-50577, dated 5 April 2026. 6 pages, complete. Signed by the loss adjuster.", "AU-50577_photographs_of_flood_water_in_the_rooms.pdf. Photographs of flood water in the rooms of property AU-50577, dated 10 June 2026. 3 pages, complete.", "AU-50577_flood_claim_form.pdf. Flood claim form for property AU-50577, dated 7 March 2026. 5 pages, complete. Signed by the policyholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 776}} {"id": "isc-te-00087-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Lindcourt plc", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "3 April 2026"}, "checklist": ["Travel insurance quote issued within the last 1 months", "Special requests note, signed", "Passport details form, signed", "Booking request form, signed"], "submission": {"case": {"name": "holiday booking NN-90265", "reference": "KO-80548"}, "documents received": ["Flight availability printout for holiday booking NN-90265, dated 24 March 2026. 2 pages, complete.", "Special requests note for holiday booking NN-90265, dated 13 December 2025. Single page, signed by the customer.", "Passport details form for holiday booking NN-90265, dated 23 February 2026. Single page, signed by the customer.", "Travel insurance quote for holiday booking NN-90265, dated 22 March 2025. 2 pages, complete.", "Booking request form for holiday booking NN-90265, dated 6 February 2026. 2 pages, complete. Signed by the reservations clerk."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete when checked against the checklist. Consider every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete: every applicable line is met (extra documents do not matter). Return incomplete: at least one applicable line is not met. Return unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-18", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 681}} {"id": "isc-te-00295-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Gormlock BV", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "29 May 2026"}, "checklist": ["Completed annual leave request form, signed", "If the leave requested is longer than 2 weeks, also: extended absence cover plan, signed", "Return to work date confirmation", "Statutory holiday entitlement confirmation", "Manager approval email, issued within the last 2 months", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave, signed", "Team holiday planner extract"], "submission": {"case": {"name": "Alice Gillsall", "reference": "SV-90688", "details": ["The leave requested is longer than two weeks.", "The employee is requesting leave during a known busy period."]}, "documents received": ["Scanned business case for peak-period leave for Alice Gillsall, dated 25 February 2026. 2 pages, complete, signed by the line manager.", "Scanned statutory holiday entitlement confirmation for Alice Gillsall, dated 28 February 2026. Single page.", "Scanned completed annual leave request form for Alice Gillsall, dated 20 April 2026. Single page, signed by the employee.", "Scanned leave balance statement for Alice Gillsall, dated 11 May 2026. Single page.", "Scanned return to work date confirmation for Alice Gillsall, dated 9 April 2026. Single page.", "Scanned extended absence cover plan for Alice Gillsall, dated 21 May 2026. 3 pages, complete, signed by the line manager.", "Scanned team holiday planner extract for Alice Gillsall, dated 13 February 2026. 2 pages, complete.", "Scanned manager approval email for Alice Gillsall, dated 20 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00257-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Pentmont Inc", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "16 September 2026"}, "checklist": ["Policy breach summary, issued within the last 3 months, signed.", "Complaint escalation form, issued within the last 1 months, signed.", "Complaint category code sheet.", "Original complaint record, issued within the last 6 months."], "submission": {"case": {"name": "escalated complaint XT-33373", "reference": "KA-91939"}, "documents received": ["Original complaint record for escalated complaint XT-33373, dated 8 April 2026. 2 pages, complete.", "Complaint escalation form for escalated complaint XT-33373, dated 5 August 2026. 2 pages, complete. Signed by the Customer Relations Manager.", "Policy breach summary for escalated complaint XT-33373, dated 26 August 2026. 2 pages, complete. Signed by the Customer Relations Manager.", "Complaint category code sheet for escalated complaint XT-33373, dated 27 July 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 650}} {"id": "isc-te-00092-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Aldness Partners", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "25 May 2026"}, "checklist": ["Leaver notification form, signed", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed", "Non-disclosure reminder acknowledgement, signed", "Service desk ticket closure summary, issued within the last 1 months", "Equipment return receipt, issued within the last 1 months, signed", "Final payroll cut-off note, issued within the last 1 months, signed", "Line manager confirmation, issued within the last 1 months, signed"], "submission": {"case": {"name": "Vikram Brodard", "reference": "VR-80988", "details": ["The leaver held no privileged administrator accounts."]}, "cover note": "I am not sure that everything needed is in this pack.", "documents received": ["Leaver_notification_form_Brodard_20260410.pdf. A leaver notification form for Vikram Brodard, dated 10 April 2026. 2 pages, complete. It is signed by the line manager.", "Equipment_return_receipt_Brodard_20260522.pdf. An equipment return receipt for Vikram Brodard, dated 22 May 2026. It is a single page and is signed by the receiving IT asset officer.", "NDA_reminder_ack_Brodard_20260319.pdf. A non-disclosure reminder acknowledgement for Vikram Brodard, dated 19 March 2026. It is a single page and is signed by the departing employee.", "Shared_mailbox_handover_Brodard_20260518.pdf. A shared mailbox handover record for Vikram covering Vikram Brodard, dated 18 May 2026. 2 pages, complete. It is signed by the line manager.", "Payroll_cut_off_note_Brodard_20260523.pdf. A final payroll cut-off note for Vikram Brodard, dated 23 May 2026. It is a single page and is signed by the payroll officer.", "Line_manager_confirmation_Brodard_20260507.pdf. A line manager confirmation for Vikram Brodard, dated 7 May 2026. It is a single page and is signed by the line manager.", "Service_desk_closure_summary_Brodard_20260517.pdf. A service desk ticket closure summary for Vikram Brodard, dated 17 May 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete when every applicable line is met (extra documents do not matter). Return incomplete when at least one applicable line is not met. Return unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-29", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 987}} {"id": "isc-te-00322-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Larvmoor Inc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "2 April 2026"}, "checklist": ["Confirm the pack includes the account closure procedure.", "Confirm the pack includes a two-factor authentication confirmation issued within the last 3 months.", "Confirm the pack includes a signed platform terms acceptance record.", "Confirm the pack includes a signed account request form.", "Confirm the pack includes a signed naming convention approval."], "submission": {"case": {"name": "new social media account FX-38776", "reference": "AG-45011"}, "documents received": ["naming_convention_approval_FX-38776.pdf. Naming convention approval for new social media account FX-38776. It is dated 1 January 2026, is a single page and is signed by the social media governance lead.", "account_request_form_FX-38776.pdf. Account request form for new social media account FX-38776. It is dated 21 March 2026, is a single page and is signed by the requesting marketing manager.", "platform_terms_acceptance_record_FX-38776.pdf. Platform terms acceptance record for new social media account FX-38776. It is dated 17 January 2026, is a single page and is signed by the social media manager.", "two_factor_authentication_confirmation_FX-38776_v4.pdf. Two-factor authentication confirmation for new social media account FX-38776. It is dated 18 January 2026 and is a single page.", "admin_access_list_FX-38776.pdf. Admin access list for new social media account FX-38776. It is dated 14 January 2026 and is a single page.", "account_closure_procedure_FX-38776.pdf. Account closure procedure for new social media account FX-38776. It is dated 21 December 2025 and is a single page."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 847}} {"id": "isc-te-00399-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Bravhall GmbH", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "7 May 2026"}, "checklist": ["If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement (valid (not expired) on the date of the review, signed)", "fit-out cost estimate (issued within the last 6 months, signed)", "training course completion certificate (issued within the last 12 months)", "pilot operation audit report (issued within the last 6 months, signed)", "signed franchise agreement counterpart (signed)", "franchise disclosure document receipt (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Aldstead Group", "reference": "OF-61011", "details": ["The franchise territory includes premises in a shopping centre."]}, "documents received": ["Aldstead Group fit-out cost estimate.pdf. The estimate is dated 12 April 2026 and runs to 4 pages, complete. It is signed by the fit-out contractor.", "Aldstead Group pilot operation audit report.pdf. The report is dated 17 February 2026 and runs to 8 pages, complete. It is signed by the lead auditor.", "Aldstead Group franchise application form.pdf. The form is dated 3 March 2026 and runs to 3 pages, complete. It is signed by the franchisee's managing director.", "Aldstead Group training course completion certificate.pdf. The certificate is dated 7 April 2026 and is a single page.", "Aldstead Group franchise disclosure document receipt.pdf. The receipt is dated 9 March 2026 and is a single page. It is signed by the franchisee's authorised representative.", "Aldstead Group signed franchise agreement counterpart.pdf. The counterpart is dated 9 April 2026 and runs to 12 pages, complete. It is signed by an authorised signatory of Bravhall GmbH and by Aldstead Group."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 832}} {"id": "isc-te-00138-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Orrmark & Co", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "6 March 2026"}, "checklist": ["Audit agenda, signed", "Open corrective action list, issued within the last 1 months, signed", "Document control list, issued within the last 3 months, signed", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary, issued within the last 3 months, signed", "Audit scope statement, signed"], "submission": {"case": {"name": "customer audit visit WK-33681", "reference": "CB-79631", "details": ["The customer auditor does not request access to sub-tier supplier records."]}, "documents received": ["Open corrective action list for customer audit visit WK-33681. Date of issue: 20 February 2026. 2 pages, complete. Signed by the quality management office lead.", "Audit agenda for customer audit visit WK-33681. Date of issue: 23 November 2025. Single page, signed by the quality management office lead.", "Document control list for customer audit visit WK-33681. Date of issue: 24 February 2026. Pages 1 to 3 are included; the total number of pages is not shown anywhere. Signed by the quality management office lead.", "Audit scope statement for customer audit visit WK-33681. Date of issue: 21 November 2025. Single page, signed by the quality management office lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 734}} {"id": "isc-te-00302-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Yondmouth plc", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "1 April 2026"}, "checklist": ["Check the pack contains the policy machinery schedule.", "Check the pack contains the machine maintenance log, issued within the last 6 months.", "If a temporary machine was hired to keep production going, also: check the pack contains the temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Check the pack contains the photographs of the failed component.", "Check the pack contains the purchase invoice for the machine.", "Check the pack contains the repair or replacement quotation, issued within the last 3 months."], "submission": {"case": {"name": "failed machine ZE-69152", "reference": "EP-56568", "details": ["No temporary machine was hired to keep production going."]}, "documents received": ["Policy machinery schedule for machine ZE-69152. Date of issue: 11 March 2026. 3 pages, complete.", "Production downtime log for machine ZE-69152. Date of issue: 6 March 2026. 2 pages, complete. Signed by the production manager.", "Machine maintenance log for machine ZE-69152. Date of issue: 30 March 2026. 5 pages, complete.", "Photographs of the failed component for machine ZE-69152. Date of issue: 24 March 2026. 2 pages, complete.", "Repair or replacement quotation for machine ZE-69152. The date of issue is smudged and cannot be read. 2 pages, complete.", "Purchase invoice for the machine for machine ZE-69152. Date of issue: 14 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case, one by one. A required document counts only if: it is the kind of document listed (not a similar one); it is about the subject of the case; it has all its pages; it is signed where the checklist asks for a signature; it has not expired on the date of the review; and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-2", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 795}} {"id": "isc-te-00095-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Maldcrest Limited", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "25 June 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed", "Travel policy extract showing advance eligibility", "Employee bank detail confirmation, issued within the last 6 months and signed", "Line manager approval for the advance, signed", "Costed trip estimate sheet, issued within the last 3 months and signed", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Omar Ebbski", "reference": "GH-37714"}, "documents received": ["Employee bank detail confirmation for Omar Ebbski. Date of issue: 6 January 2026. 1 page. Signed by the employee.", "Travel policy extract showing advance eligibility for Omar Ebbski. Date of issue: 21 May 2026. 1 page.", "Costed trip estimate sheet for Omar Ebbski. Date of issue: 15 May 2026. 1 page. Signed by the line manager.", "Payroll deduction agreement for recovery of the advance for Omar Ebbski. Date of issue: 7 April 2026. 1 page. Signed by the employee.", "Line manager approval for the advance for Omar Ebbski. Date of issue: 4 March 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 703}} {"id": "isc-te-00154-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Gravheim & Co", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "19 May 2026"}, "checklist": ["If the supplier missed the agreed service levels, also: service credit request form (signed)", "Service level summary (issued within the last 12 months)", "Contract compliance checklist (signed)", "Quality inspection report (issued within the last 6 months, signed)", "Invoice discrepancy log", "Supplier performance scorecard (signed)", "Supplier response letter (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Jorstead GmbH", "reference": "CT-25492"}, "cover note": "All the paperwork is in order, so I would be grateful for a quick approval.", "documents received": ["Delivery record summary for Jorstead GmbH, dated 19 February 2026. 2 pages, complete.", "Supplier performance scorecard for Jorstead GmbH, dated 14 April 2026. Signed by the supplier manager. 2 pages, complete.", "Supplier response letter for Jorstead GmbH, dated 27 April 2026. Signed by the supplier's account director. Single page.", "Quality inspection report for Jorstead GmbH, dated 12 May 2026. Signed by the quality inspector. 3 pages, complete.", "Corrective action plan for Jorstead GmbH, dated 31 March 2026. Signed by the supplier manager. 2 pages, complete.", "Invoice discrepancy log for Jorstead GmbH, dated 10 February 2026. 2 pages, complete.", "Service level summary for Jorstead GmbH, dated 14 October 2025. Single page.", "Contract compliance checklist for Jorstead GmbH, dated 5 February 2026. Signed by the contract manager. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00459-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Mersstead Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "14 August 2026"}, "checklist": ["Sales invoice or receipt for the sale proceeds, issued within the last 3 months", "Asset disposal request form, signed", "If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer, issued within the last 3 months", "Fixed asset register extract for the asset", "Depreciation schedule for the asset to date"], "submission": {"case": {"name": "disposed asset LV-4099", "reference": "IW-81554", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Written offer or valuation for the asset for disposed asset LV-4099. Date of issue: 5 June 2026. 2 pages, complete.", "Asset disposal request form for disposed asset LV-4099. Date of issue: 27 May 2026. 2 pages, complete. Signed by the budget holder.", "Sales invoice or receipt for the sale proceeds for disposed asset LV-4099. Date of issue: 10 August 2026. 1 page.", "Depreciation schedule for the asset to date for disposed asset LV-4099. Date of issue: 16 May 2026. 2 pages, complete.", "Fixed asset register extract for the asset for disposed asset LV-4099. Date of issue: 3 June 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 736}} {"id": "isc-te-00407-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Morvwood plc", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "9 June 2026"}, "checklist": ["If the customer auditor requests access to sub-tier supplier records, also include: sub-tier supplier records summary (issued within the last 3 months, signed)", "layout tour plan (signed)", "previous audit findings closure file (signed)", "training matrix extract (issued within the last 3 months, signed)", "calibration status summary (issued within the last 1 months, signed)", "open corrective action list (issued within the last 1 months, signed)", "audit agenda (signed)"], "submission": {"case": {"name": "customer audit visit YO-54795", "reference": "YP-28673", "details": ["The customer auditor does not request access to sub-tier supplier records."]}, "documents received": ["Audit scope statement for customer audit visit YO-54795, issued 12 March 2026. Single page, signed by the quality manager.", "Training matrix extract for customer audit visit YO-54795, issued 28 February 2026. 3 pages, complete, signed by the training coordinator.", "Calibration status summary for customer audit visit YO-54795, issued 31 May 2026. 2 pages, complete, signed by the calibration lead.", "Layout tour plan for customer audit visit YO-54795, issued 26 May 2026. Single page, signed by the quality manager.", "Open corrective action list for customer audit visit YO-54795, issued 24 May 2026. 2 pages, complete, signed by the quality manager.", "Previous audit findings closure file for customer audit visit YO-54795, issued 12 April 2026. 6 pages, complete, signed by the quality manager.", "Audit agenda for customer audit visit YO-54795, issued 21 February 2026. Single page, signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete when checked against the checklist. Consider every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete: every applicable line is met (extra documents do not matter). Return incomplete: at least one applicable line is not met. Return unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-18", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 866}} {"id": "isc-te-00090-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Uldvale LLP", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "27 April 2026"}, "checklist": ["Asset register update, issued within the last 1 months.", "Decommission request form, signed.", "Final backup confirmation, issued within the last 3 months, signed.", "Data migration confirmation, issued within the last 3 months, signed.", "Dependent systems check report, issued within the last 3 months.", "Licence reassignment note, issued within the last 3 months, signed.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server HC-85039", "reference": "XH-31889", "details": ["The server holds archived records that must be kept."]}, "documents received": ["Asset register update for retired server HC-85039, dated 15 April 2026. Single page.", "Final backup confirmation for retired server HC-85039, dated 26 March 2026. Single page. Signed by the backup administrator.", "Dependent systems check report for retired server HC-85039, dated 21 March 2026. 3 pages, complete.", "Archive retention confirmation for retired server HC-85039, dated 28 March 2026. 2 pages, complete. Signed by the records manager.", "Network disconnection confirmation for retired server HC-85039, dated 20 April 2026. Single page. Signed by the network operations engineer.", "Data migration confirmation for retired server HC-85039, dated 25 March 2026. 2 pages, complete. Signed by the systems migration lead.", "Decommission request form for retired server HC-85039, dated 5 January 2026. 2 pages, complete. Signed by the infrastructure operations team lead."]}}, "question": {"type": "choice", "instructions": "The task is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-51", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 848}} {"id": "isc-te-00263-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Gravton GmbH", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "20 March 2026"}, "checklist": ["Remediation items list, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Alerting rules review note, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months, signed.", "Customer impact statement, issued within the last 3 months."], "submission": {"case": {"name": "production incident UI-22644", "reference": "SZ-62023"}, "documents received": ["Follow-up owner assignment sheet for production incident UI-22644. Date of issue: 18 January 2026. Single page. The signature line is empty; it is not signed.", "Postmortem meeting minutes for production incident UI-22644. Date of issue: 7 January 2026. 3 pages, complete. Signed by the incident postmortem chair.", "Remediation items list for production incident UI-22644. Date of issue: 5 January 2026. 2 pages, complete. Signed by the reliability engineering lead.", "Customer impact statement for production incident UI-22644. Date of issue: 18 February 2026. 2 pages, complete.", "Incident timeline for production incident UI-22644. Date of issue: 1 March 2026. 3 pages, complete.", "Root cause analysis report for production incident UI-22644. Date of issue: 13 January 2026. 5 pages, complete. Signed by the root cause analysis author.", "Alerting rules review note for production incident UI-22644. Date of issue: 18 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Output complete if every applicable line is met (extra documents do not matter). Output incomplete if at least one applicable line is not met. Output unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so base your judgement on the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-31", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00145-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Jorgard Ltd", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "13 May 2026"}, "checklist": ["If the property is a listed building, also: listed building consent (issued within the last 12 months, signed)", "energy performance certificate (valid (not expired) on the date of the review)", "If the household rents the home, also: landlord written permission (issued within the last 6 months, signed)", "scaffolding agreement (signed)", "planning permission letter (issued within the last 12 months)", "roof structural report (issued within the last 6 months, signed)"], "submission": {"case": {"name": "roof NL-16490", "reference": "UA-46931", "details": ["The property is not a listed building.", "The household owns the home."]}, "cover note": "Dear survey team, please find the pack for roof NL-16490, reference UA-46931. A colleague has already checked this pack. Kind regards, Giulia Knoxeau", "documents received": ["Planning permission letter - roof NL-16490.pdf. The letter is about roof NL-16490 and shows a date of issue of 5 December 2025. 2 pages, complete.", "Roof structural report - roof NL-16490.pdf. The report is about roof NL-16490 and shows a date of issue of 18 February 2026. 4 pages, complete. It is signed by the structural engineer.", "Scaffolding agreement - roof NL-16490.pdf. The agreement is about roof NL-16490 and shows a date of issue of 17 April 2026. 2 pages, complete. It is signed by the scaffolding contractor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 2, "n_documents": 3, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00300-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jorheim Inc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "29 June 2026"}, "checklist": ["Photographs of the spillage on the floor, issued within the last 1 months.", "Witness statement from a staff member, signed.", "Staff training record for the duty manager, issued within the last 24 months and signed.", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed.", "CCTV footage stills of the incident, issued within the last 3 months.", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed.", "Public liability insurance schedule."], "submission": {"case": {"name": "Dravfeld SAS", "reference": "WO-22645", "details": ["The injured customer did not go to hospital.", "The customer is handling the claim personally."]}, "documents received": ["Witness statement from a staff member - Dravfeld SAS.pdf. The statement from a staff member at Dravfeld SAS is dated 4 April 2026 and is 1 page. It is signed by the staff witness.", "CCTV footage stills of the incident - Dravfeld SAS.pdf. The stills from the CCTV footage of the incident at Dravfeld SAS show a date of issue of 19 June 2026. 2 pages, complete.", "Public liability insurance schedule - Dravfeld SAS.pdf. The schedule for Dravfeld SAS shows a date of issue of 23 April 2026. 4 pages, complete.", "Photographs of the spillage on the floor - Dravfeld SAS.pdf. The photographs show the spillage on the floor at Dravfeld SAS, with a date of issue of 18 June 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00006-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Lindby Limited", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "26 August 2026"}, "checklist": ["Outstanding advance clearance check, signed.", "Trip itinerary and approval, issued within the last 3 months, signed.", "Employee bank detail confirmation, issued within the last 6 months, signed.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Travel advance request form, signed.", "Costed trip estimate sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "Mert Tadsall", "reference": "BC-86447", "details": ["The requested advance is within the standard advance limit."]}, "cover note": "I am sending the pack for reference BC-86447, but I am not sure everything needed is there. Please review it and let me know if anything still needs to be sent.", "documents received": ["BC-86447_employee_bank_detail_confirmation_Mert_Tadsall.pdf - Employee bank detail confirmation for Mert Tadsall, dated 13 March 2026. 1 page. Signed by the payroll officer.", "BC-86447_trip_itinerary_and_approval_Mert_Tadsall.pdf - Trip itinerary and approval for Mert Tadsall, dated 6 August 2026. 2 pages, complete. Signed by the line manager.", "BC-86447_travel_advance_request_form_Mert_Tadsall.pdf - Travel advance request form for Mert Tadsall, dated 13 August 2026. 1 page. Signed by Mert Tadsall, the employee.", "BC-86447_bank_statement_colleague.pdf - Bank statement belonging to a colleague, filed in the name of Mert Tadsall, dated 13 March 2026. 1 page. Signed by the colleague, the account holder.", "BC-86447_costed_trip_estimate_sheet_Mert_Tadsall.pdf - Costed trip estimate sheet for Mert Tadsall, dated 9 August 2026. 1 page. Signed by the line manager.", "BC-86447_line_manager_approval_Mert_Tadsall.pdf - Line manager approval for the advance for Mert Tadsall, dated 19 August 2026. 1 page. Signed by the line manager.", "BC-86447_outstanding_advance_clearance_check_Mert_Tadsall.pdf - Outstanding advance clearance check for Mert Tadsall, dated 3 June 2026. 1 page. Signed by the accounts payable supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 965}} {"id": "isc-te-00136-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Tondside Partners", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "12 May 2026"}, "checklist": ["Previous audit follow-up record, issued within the last 24 months, signed.", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list, signed.", "Audit finding sheets, signed.", "Audit interview notes, signed.", "Management review minutes, signed.", "Audit checklist for each area visited, signed.", "Internal audit plan, issued within the last 12 months, signed."], "submission": {"case": {"name": "internal audit MX-72526", "reference": "LS-20464", "details": ["The audit did not cover the calibration laboratory."]}, "documents received": ["File 002846.pdf. The file will not open, so its contents cannot be seen.", "Audit summary report - MX-72526.pdf. The report summarises internal audit MX-72526 and is dated 23 April 2026. It runs to 5 pages, complete, and is signed by the lead auditor.", "Previous audit follow-up record - MX-72526.pdf. The record relates to internal audit MX-72526 and is dated 23 September 2025. It runs to 2 pages, complete, and is signed by the lead auditor.", "Internal audit plan - MX-72526.pdf. The plan covers internal audit MX-72526 and is dated 14 August 2025. It runs to 2 pages, complete, and is signed by the quality manager.", "Audit finding sheets - MX-72526.pdf. The sheets cover internal audit MX-72526 and show a date of issue of 22 January 2026. They run to 2 pages, complete, and are signed by the lead auditor.", "Management review minutes - MX-72526.pdf. The minutes concern internal audit MX-72526 and are dated 20 February 2026. They run to 4 pages, complete, and are signed by the chair of the review board.", "Audit attendance sheet - MX-72526.pdf. The sheet records attendance at internal audit MX-72526 and is dated 17 March 2026. It is a single page and is signed by the lead auditor.", "Audit checklist for each area visited - MX-72526.pdf. The checklists relate to internal audit MX-72526 and are dated 2 April 2026. They run to 4 pages, complete, and are signed by the auditor for each area."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 987}} {"id": "isc-te-00008-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Glenstead Ltd", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "3 August 2026"}, "checklist": ["Signed bank charges and interest explanation sheet.", "If the account is a foreign currency account, also: signed exchange rate conversion schedule.", "Outstanding receipts list.", "Signed reviewer sign-off sheet for the reconciliation.", "Signed bank reconciliation statement.", "If the reconciliation shows an unexplained difference that is not an outstanding item, also: signed unexplained difference investigation note.", "Direct debit mandate report from the bank, issued within the last 3 months."], "submission": {"case": {"name": "company bank account ZZ-59368", "reference": "LP-94539", "details": ["The account is a foreign currency account.", "The reconciliation shows an unexplained difference that is not an outstanding item."]}, "documents received": ["unexplained_difference_investigation_note_ZZ-59368.pdf - Unexplained difference investigation note for company bank account ZZ-59368, dated 30 April 2026. It is 2 pages, complete, and signed by the financial controller.", "bank_statement_ZZ-59368.pdf - Bank statement for the period for company bank account ZZ-59368, dated 9 July 2026. It is 4 pages, complete.", "exchange_rate_conversion_schedule_ZZ-59368.pdf - Exchange rate conversion schedule for company bank account ZZ-59368, dated 17 April 2026. It is a single page, signed by the financial controller.", "outstanding_receipts_list_ZZ-59368.pdf - Outstanding receipts list for company bank account ZZ-59368, dated 6 July 2026. It is a single page.", "bank_charges_and_interest_explanation_sheet_ZZ-59368.pdf - Bank charges and interest explanation sheet for company bank account ZZ-59368, dated 13 June 2026. It is a single page, signed by the financial controller.", "direct_debit_mandate_report_ZZ-59368.pdf - Direct debit mandate report from the bank for company bank account ZZ-59368, dated 1 July 2026. It is 2 pages, complete.", "outstanding_payments_list_ZZ-59368.pdf - Outstanding payments list for company bank account ZZ-59368, dated 25 July 2026. It is a single page.", "bank_reconciliation_statement_ZZ-59368.pdf - Bank reconciliation statement for company bank account ZZ-59368, dated 17 April 2026. It shows pages 1-1 of 2, and it is signed by the financial controller.", "reviewer_sign-off_sheet_ZZ-59368.pdf - Reviewer sign-off sheet for the reconciliation for company bank account ZZ-59368, dated 9 June 2026. It is a single page, signed by the financial controller."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document the checklist lists (not one that merely looks similar), it is about the case's subject, it has all its pages, it is signed wherever the checklist asks for a signature, it has not expired on the review date, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents are irrelevant. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "variant-59", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1076}} {"id": "isc-te-00401-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Yondwell Limited", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "31 July 2026"}, "checklist": ["Inbound unloading record, issued within the last 1 months and signed.", "Transfer completion confirmation, issued within the last 1 months and signed.", "Seal number log, issued within the last 1 months and signed.", "Transfer manifest, signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet, issued within the last 1 months and signed.", "Outbound loading record, issued within the last 1 months and signed.", "Cross-dock slot booking sheet, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer MZ-75713", "reference": "QF-14367", "details": ["The transfer includes a temperature-controlled load."]}, "cover note": "Could you approve this pack quickly, as all the paperwork is in order?", "documents received": ["Inbound unloading record for cross-dock transfer MZ-75713, dated 10 July 2026, 1 page. It is signed by the inbound unloading team leader.", "Seal number log for cross-dock transfer MZ-75713, dated 12 July 2026, 1 page. It is signed by the cross-dock supervisor.", "Outbound loading record for cross-dock transfer MZ-75713, dated 25 July 2026, 1 page. It is signed by the outbound loading team leader.", "Cross-dock chiller unit check sheet for cross-dock transfer MZ-75713, dated 28 July 2026, 1 page. It is signed by the refrigeration technician.", "Cross-dock slot booking sheet for cross-dock transfer MZ-75713, dated 11 July 2026, 1 page. It is signed by the slot booking coordinator.", "Picking list for a single customer order on cross-dock transfer MZ-75713, dated 22 May 2026, 3 pages, complete. It is signed by the warehouse picker.", "Transfer completion confirmation for cross-dock transfer MZ-75713, dated 18 July 2026, 1 page. It is signed by the transport planner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 924}} {"id": "isc-te-00053-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Gravmark plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "1 May 2026"}, "checklist": ["Account closure procedure is included in the pack.", "Account purpose statement is included in the pack.", "Platform terms acceptance record, signed, is included in the pack.", "Content escalation route, signed, is included in the pack.", "Naming convention approval, signed, is included in the pack."], "submission": {"case": {"name": "new social media account UG-91608", "reference": "FX-57324"}, "documents received": ["platform_terms_acceptance_record_UG-91608.pdf - Platform terms acceptance record for new social media account UG-91608. Its date of issue is 11 March 2026. It is 1 page. It is signed by the account owner.", "account_request_form_UG-91608.pdf - Account request form for new social media account UG-91608. Its date of issue is 30 March 2026. It is 1 page. It is signed by the requesting marketing manager.", "content_escalation_route_UG-91608.pdf - Content escalation route for new social media account UG-91608. Its date of issue is 7 January 2026. It is 1 page. It is signed by the social media governance team lead.", "account_purpose_statement_UG-91608.pdf - Account purpose statement for new social media account UG-91608. Its date of issue is 24 March 2026. It is 1 page.", "file_FX-57324_07.pdf - The contents of this file cannot be seen, as the scan is blank.", "naming_convention_approval_UG-91608.pdf - Naming convention approval for new social media account UG-91608. Its date of issue is 18 March 2026. It is 1 page. It is signed by the social media governance team lead.", "account_closure_procedure_UG-91608.pdf - Account closure procedure for new social media account UG-91608. Its date of issue is 5 January 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 905}} {"id": "isc-te-00408-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Jarlfeld Inc", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "17 April 2026"}, "checklist": ["Signed audit checklist for each area visited", "Signed audit finding sheets", "Signed audit interview notes", "Signed audit attendance sheet", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list (signed)", "Signed previous audit follow-up record issued within the last 24 months"], "submission": {"case": {"name": "internal audit OC-33937", "reference": "ST-29209", "details": ["The audit did not cover the calibration laboratory."]}, "documents received": ["OC-33937_audit_checklist.pdf. Audit checklist for each area visited for internal audit OC-33937, dated 1 March 2026. 4 pages, complete. Signed by the lead auditor.", "OC-33937_audit_summary_report.pdf. Audit summary report for internal audit OC-33937, dated 11 March 2026. 5 pages, complete. Signed by the lead auditor.", "OC-33937_audit_finding_sheets.pdf. Audit finding sheets for internal audit OC-33937, dated 26 March 2026. 2 pages, complete. The signature line is empty; the document is not signed.", "OC-33937_internal_audit_plan.pdf. Internal audit plan for internal audit OC-33937, dated 30 January 2026. 2 pages, complete. Signed by the quality manager.", "OC-33937_audit_attendance_sheet.pdf. Audit attendance sheet for internal audit OC-33937, dated 16 January 2026. Single page. Signed by the site management review board chair.", "OC-33937_audit_interview_notes.pdf. Audit interview notes for internal audit OC-33937, dated 10 April 2026. 3 pages, complete. Signed by the lead auditor.", "OC-33937_previous_audit_follow_up_record.pdf. Previous audit follow-up record for internal audit OC-33937, dated 29 March 2026. 2 pages, complete. Signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 899}} {"id": "isc-te-00190-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ovarcourt GmbH", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "20 March 2026"}, "checklist": ["Mortgage application form, signed", "Sale and purchase agreement, signed", "Proof of deposit issued within the last 3 months", "Photo identity document valid (not expired) on the date of the review", "Credit bureau report issued within the last 1 months", "Employment certificate issued within the last 1 months, signed"], "submission": {"case": {"name": "property YQ-74246", "reference": "EC-84723"}, "documents received": ["employment-certificate-YQ-74246.pdf — Employment certificate for property YQ-74246. It shows a date of issue of 14 March 2026. It is 1 page and is signed by the employer.", "mortgage-application-form-YQ-74246.pdf — Mortgage application form for property YQ-74246. It shows a date of issue of 7 December 2025. It is 6 pages, complete, and is signed by the applicant.", "sale-and-purchase-agreement-YQ-74246.pdf — Sale and purchase agreement for property YQ-74246. It shows a date of issue of 6 March 2026. It is 9 pages, complete, and is signed by the buyer and the seller.", "proof-of-deposit-YQ-74246.pdf — Proof of deposit for property YQ-74246. It shows a date of issue of 8 January 2026. It is 1 page.", "credit-bureau-report-YQ-74246.pdf — Credit bureau report for property YQ-74246. It shows a date of issue of 10 March 2026. It is 4 pages, complete.", "photo-identity-document-YQ-74246.pdf — Photo identity document for property YQ-74246. It shows an expiry date of 8 November 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 860}} {"id": "isc-te-00227-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Gravlock plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "24 June 2026"}, "checklist": ["supplier quality questionnaire, issued within the last 12 months, signed", "supplier capacity declaration, issued within the last 12 months, signed", "supplier audit report, issued within the last 24 months, signed", "supplier corrective action plan, issued within the last 6 months, signed", "financial stability statement, issued within the last 12 months, signed", "certified quality management system certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Mersheim BV", "reference": "TB-65922"}, "documents received": ["TB-65922_supplier_quality_questionnaire_Mersheim.pdf - Supplier quality questionnaire for Mersheim BV. Date of issue: 19 November 2025. 4 pages, complete. Signed by the supplier's quality manager.", "TB-65922_financial_stability_statement_Mersheim.pdf - Financial stability statement for Mersheim BV. Date of issue: 11 April 2026. 2 pages, complete. Signed by the supplier's finance director.", "TB-65922_supplier_audit_report_Mersheim.pdf - Supplier audit report for Mersheim BV. Date of issue: 2 July 2025. 8 pages, complete. Signed by the lead auditor.", "TB-65922_certified_qms_certificate_Mersheim.pdf - Certified quality management system certificate for Mersheim BV. Expiry date: 19 October 2028. Single page.", "TB-65922_supplier_capacity_declaration_Mersheim_v6.pdf - Supplier capacity declaration for Mersheim BV. Date of issue: 25 November 2024. 2 pages, complete. Signed by the supplier's operations manager.", "TB-65922_supplier_corrective_action_plan_Mersheim.pdf - Supplier corrective action plan for Mersheim BV. Date of issue: 11 March 2026. 3 pages, complete. Signed by the supplier's quality manager.", "TB-65922_supplier_self_assessment_report_Mersheim.pdf - Supplier self-assessment report for Mersheim BV. Date of issue: 31 May 2026. 6 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack satisfies the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-66", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 924}} {"id": "isc-te-00488-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Dravwood & Co", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "22 May 2026"}, "checklist": ["Breach evidence log, issued within the last 1 month and signed", "Original service agreement copy", "Losses calculation statement, issued within the last 1 month and signed", "If the defaulting party is a public sector body, also: public sector termination approvals record, issued within the last 3 months and signed", "If the contract requires a dispute to go to mediation first, also: mediation request confirmation, issued within the last 1 month and signed", "Default notice previously served, issued within the last 6 months and signed"], "submission": {"case": {"name": "Bravberg SAS", "reference": "YW-54965", "details": ["The defaulting party is a public sector body.", "The contract allows termination without prior mediation."]}, "cover note": "I apologise that this pack was put together in a rush.", "documents received": ["Termination notice draft for Bravberg SAS, dated 28 March 2026. 2 pages, complete. Signed by the senior legal counsel.", "Breach evidence log for Bravberg SAS, dated 13 May 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Public sector termination approvals record for Bravberg SAS, dated 28 March 2026. 2 pages, complete. Signed by the head of procurement.", "File scan_doc_0425.pdf. The file will not open, so its contents cannot be seen.", "Original service agreement copy relating to Bravberg SAS, dated 22 March 2026. 10 pages, complete.", "Default notice previously served on Bravberg SAS, dated 21 December 2025. Single page. Signed by the contracts manager.", "Losses calculation statement for Bravberg SAS, dated 8 May 2026. 3 pages, complete. Signed by the finance manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 827}} {"id": "isc-te-00277-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Holham Ltd", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "16 April 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed.", "Payroll deduction agreement for recovery of the advance, signed.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Line manager approval for the advance, signed.", "Costed trip estimate sheet, issued within the last 3 months and signed.", "Travel policy extract showing advance eligibility."], "submission": {"case": {"name": "Xiu Yellisey", "reference": "OK-65774", "details": ["The requested advance is within the standard advance limit."]}, "documents received": ["Trip itinerary and approval for Xiu Yellisey, dated 23 January 2026. 2 pages, complete. Signed by the line manager.", "Travel policy extract showing advance eligibility for Xiu Yellisey, dated 27 December 2025. Single page.", "Trip itinerary and approval for Xiu Yellisey, dated 17 May 2025. 2 pages, complete. Signed by the line manager.", "Line manager approval for the advance for Xiu Yellisey, dated 24 December 2025. Single page. Signed by the line manager.", "Payroll deduction agreement for recovery of the advance for Xiu Yellisey, dated 11 January 2026. Single page. Signed by the employee, Xiu Yellisey.", "Outstanding advance clearance check for Xiu Yellisey, dated 28 February 2026. Single page. Signed by the accounts payable reviewer.", "Employee bank detail confirmation for Xiu Yellisey, dated 1 March 2026. Single page. Signed by the employee, Xiu Yellisey.", "Costed trip estimate sheet for Xiu Yellisey, dated 2 March 2026. Single page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00249-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Wilmwood Inc", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "13 May 2026"}, "checklist": ["If the adult owns property that could be considered in the financial assessment, also: property valuation report (issued within the last 12 months, signed)", "needs assessment report (signed)", "recent bank statements (issued within the last 3 months)", "support plan (signed)", "proof of identity (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Rhys Lamnall", "reference": "CN-53168", "details": ["The adult does not own property that could be considered in the financial assessment."]}, "cover note": "Apologies that this pack was put together in a rush.", "documents received": ["needs assessment report.pdf — A needs assessment report about Rhys Lamnall, dated 24 March 2026. It has 12 pages, complete. It is signed by a social worker.", "document.pdf — The file will not open, so its contents cannot be seen.", "support plan.pdf — A support plan about Rhys Lamnall, dated 25 February 2026. It has 6 pages, complete. It is signed by a social worker.", "proof of identity.pdf — A proof of identity about Rhys Lamnall, showing an expiry date of 20 April 2027. It is a single page.", "capacity assessment record.pdf — A capacity assessment record about Rhys Lamnall, dated 13 April 2026. It has 4 pages, complete. It is signed by an approved mental health professional.", "recent bank statements.pdf — Recent bank statements about Rhys Lamnall, dated 10 April 2026. It has 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 791}} {"id": "isc-te-00145-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Jorgard Ltd", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "13 May 2026"}, "checklist": ["If the property is a listed building, also: listed building consent (issued within the last 12 months, signed)", "energy performance certificate (valid (not expired) on the date of the review)", "If the household rents the home, also: landlord written permission (issued within the last 6 months, signed)", "scaffolding agreement (signed)", "planning permission letter (issued within the last 12 months)", "roof structural report (issued within the last 6 months, signed)"], "submission": {"case": {"name": "roof NL-16490", "reference": "UA-46931", "details": ["The property is not a listed building.", "The household owns the home."]}, "documents received": ["Scaffolding agreement - roof NL-16490.pdf. The agreement is about roof NL-16490 and shows a date of issue of 17 April 2026. 2 pages, complete. It is signed by the scaffolding contractor.", "Energy performance certificate - roof NL-16490.pdf. The certificate is about roof NL-16490 and shows an expiry date of 28 October 2027. 3 pages, complete.", "Roof structural report - roof NL-16490.pdf. The report is about roof NL-16490 and shows a date of issue of 18 February 2026. 4 pages, complete. It is signed by the structural engineer.", "Planning permission letter - roof NL-16490.pdf. The letter is about roof NL-16490 and shows a date of issue of 5 December 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The task is to decide whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete if every applicable line is met (extra documents do not matter). Answer incomplete if at least one applicable line is not met. Answer unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 2, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-70", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 805}} {"id": "isc-te-00382-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Norvwater Group", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "14 May 2026"}, "checklist": ["Confirm the planned completion date sheet is included and signed.", "Confirm the location details sheet is included.", "Confirm the access authorisation slip is included and signed.", "Confirm the parts order confirmation is included and was issued within the last 1 months.", "Confirm the cost estimate is included, was issued within the last 3 months, and is signed."], "submission": {"case": {"name": "maintenance request AM-49331", "reference": "TF-32348"}, "cover note": "All the paperwork for this pack is in order, so I would be grateful for a quick approval so the job can be passed to the trade team without delay.", "documents received": ["AM-49331_cost_estimate_20March2025.pdf - Cost estimate for maintenance request AM-49331, dated 20 March 2025. 2 pages, complete. Signed by the estimating officer.", "AM-49331_parts_order_confirmation.pdf - Parts order confirmation for maintenance request AM-49331, dated 24 April 2026. Single page.", "AM-49331_access_authorisation_slip.pdf - Access authorisation slip for maintenance request AM-49331, dated 25 January 2026. Single page. Signed by the security manager.", "AM-49331_location_details_sheet.pdf - Location details sheet for maintenance request AM-49331, dated 2 May 2026. Single page.", "AM-49331_job_request_form.pdf - Job request form for maintenance request AM-49331, dated 6 May 2026. Single page. Signed by the requesting manager.", "AM-49331_planned_completion_date_sheet.pdf - Planned completion date sheet for maintenance request AM-49331, dated 26 January 2026. Single page. Signed by the maintenance supervisor."]}}, "question": {"type": "choice", "instructions": "Decide if the pack meets the checklist. Review each checklist line that applies to this case one by one. A required document only counts when it is the kind of document listed (not a similar one), is about the subject of the case, includes all its pages, is signed where the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-34", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 849}} {"id": "isc-te-00158-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Yarvgate & Co", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "28 May 2026"}, "checklist": ["Knowledge test pass certificate on file", "Driver declaration of convictions, signed, on file", "Photo driving licence on file, valid on the date of the review and not expired", "Medical examination certificate on file, issued within the last 6 months and signed", "Licence application form on file, signed", "Criminal record check on file, issued within the last 3 months"], "submission": {"case": {"name": "Anna Lundcombe", "reference": "EX-98046"}, "cover note": "Please find attached everything needed for this pack, all complete. If anything further is required, let me know. Simon Wadard", "documents received": ["Medical examination certificate for Anna Lundcombe, dated 25 May 2026. 2 pages, complete. Signed by the examining doctor.", "Driver declaration of convictions for Anna Lundcombe, dated 8 March 2026. Signed by the driver, Anna Lundcombe. Single page.", "Right to work share code printout for Anna Lundcombe, dated 31 March 2026. Single page.", "Photo driving licence for Anna Lundcombe, expiring 30 January 2027. Only 1 of its 2 pages included (pages 1-1 of 2).", "Licence application form for Anna Lundcombe, dated 20 April 2026. 6 pages, complete. Signed by the applicant, Anna Lundcombe.", "Knowledge test pass certificate for Anna Lundcombe, dated 21 May 2026. Single page.", "Criminal record check for Anna Lundcombe, dated 15 May 2026. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 779}} {"id": "isc-te-00128-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskwick Group", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "3 April 2026"}, "checklist": ["Check that the pack contains a signed franchise agreement counterpart, signed.", "Check that the pack contains a franchise application form, signed.", "Check that the pack contains a funding agreement from a lender, signed and issued within the last 3 months.", "Check that the pack contains a training course completion certificate issued within the last 12 months.", "Check that the pack contains a fit-out cost estimate, signed and issued within the last 6 months.", "Check that the pack contains a pilot operation audit report, signed and issued within the last 6 months."], "submission": {"case": {"name": "Tondholm LLP", "reference": "WK-42460"}, "cover note": "All the paperwork is in order, so it would be great if you could approve this one quickly.", "documents received": ["Operator licence concerning Tondholm LLP, expiring 18 September 2028. 2 pages, complete.", "Franchise disclosure document receipt concerning Tondholm LLP, dated 30 March 2026. Single page. Signed by a partner of Tondholm LLP on behalf of the franchisee.", "Pilot operation audit report concerning Tondholm LLP, dated 13 October 2025. 8 pages, complete. The signature line is empty, so the report is unsigned.", "Signed franchise agreement counterpart concerning Tondholm LLP, dated 12 December 2025. 12 pages, complete. Signed by the franchisor's authorised signatory.", "Training course completion certificate concerning Tondholm LLP, dated 12 November 2025. Single page.", "Franchise application form concerning Tondholm LLP, dated 21 January 2026. 3 pages, complete. Signed by a partner of Tondholm LLP on behalf of the franchisee.", "Fit-out cost estimate concerning Tondholm LLP, dated 4 November 2025. 4 pages, complete. Signed by the fit-out contractor who prepared the estimate.", "Funding agreement from a lender concerning Tondholm LLP, dated 11 February 2026. 6 pages, complete. Signed by the lender's authorised signatory."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 887}} {"id": "isc-te-00382-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Norvwater Group", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "14 May 2026"}, "checklist": ["Confirm the planned completion date sheet is included and signed.", "Confirm the location details sheet is included.", "Confirm the access authorisation slip is included and signed.", "Confirm the parts order confirmation is included and was issued within the last 1 months.", "Confirm the cost estimate is included, was issued within the last 3 months, and is signed."], "submission": {"case": {"name": "maintenance request AM-49331", "reference": "TF-32348"}, "documents received": ["AM-49331_access_authorisation_slip.pdf - Access authorisation slip for maintenance request AM-49331, dated 25 January 2026. Single page. Signed by the security manager.", "AM-49331_planned_completion_date_sheet.pdf - Planned completion date sheet for maintenance request AM-49331, dated 26 January 2026. Single page. Signed by the maintenance supervisor.", "AM-49331_parts_order_confirmation.pdf - Parts order confirmation for maintenance request AM-49331, dated 24 April 2026. Single page.", "AM-49331_cost_estimate_undated.pdf - Cost estimate for maintenance request AM-49331. The issue date is covered by a stamp. 2 pages, complete. Signed by the estimating officer.", "AM-49331_location_details_sheet.pdf - Location details sheet for maintenance request AM-49331, dated 2 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 756}} {"id": "isc-te-00403-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Garnmore Ltd", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "18 May 2026"}, "checklist": ["Trade references letter issued within the last 3 months and signed", "Credit limit approval memo issued within the last 1 months and signed", "Personal guarantee signed", "Signed credit terms agreement signed", "Credit reference agency report issued within the last 3 months"], "submission": {"case": {"name": "Kestridge BV", "reference": "FL-14202"}, "documents received": ["Signed credit terms agreement – Kestridge BV (scan B).pdf. Signed credit terms agreement about Kestridge BV, dated 11 March 2026. 4 pages, complete. The signature line is empty, so it is not signed.", "Personal guarantee – Kestridge BV.pdf. Personal guarantee about Kestridge BV, dated 9 May 2026. 2 pages, complete. Signed by a director of Kestridge BV.", "Credit reference agency report – Kestridge BV.pdf. Credit reference agency report about Kestridge BV, dated 3 May 2026. 6 pages, complete.", "Credit limit approval memo – Kestridge BV.pdf. Credit limit approval memo about Kestridge BV, dated 8 May 2026. 1 page. Signed by a credit control supervisor.", "Trade references letter – Kestridge BV.pdf. Trade references letter about Kestridge BV, dated 13 March 2026. 1 page. Signed by a credit manager."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 728}} {"id": "isc-te-00049-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Kenvston Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "24 April 2026"}, "checklist": ["If the audit found a major non-conformity, also: major non-conformity corrective action plan (signed)", "audit interview notes (signed)", "internal audit plan (issued within the last 12 months, signed)", "audit attendance sheet (signed)", "audit checklist for each area visited (signed)"], "submission": {"case": {"name": "internal audit CD-75948", "reference": "DM-54948"}, "documents received": ["audit_finding_sheets_CD-75948.pdf - Audit finding sheets for internal audit CD-75948. Date of issue: 30 March 2026. 2 pages, complete. Signed by the lead auditor.", "audit_checklist_CD-75948.pdf - Audit checklist for each area visited under internal audit CD-75948. Date of issue: 17 January 2026. 4 pages, complete. Signed by the lead auditor.", "audit_interview_notes_CD-75948.pdf - Audit interview notes for internal audit CD-75948. Date of issue: 2 February 2026. 3 pages, complete. Signed by the lead auditor.", "major_non-conformity_corrective_action_plan_CD-75948.pdf - Major non-conformity corrective action plan for internal audit CD-75948. Date of issue: 5 March 2026. 3 pages, complete. Signed by the quality manager.", "internal_audit_plan_CD-75948.pdf - Internal audit plan for internal audit CD-75948. Date of issue: 23 December 2025. 2 pages, complete. Signed by the lead auditor.", "previous_audit_follow-up_record_CD-75948.pdf - Previous audit follow-up record for internal audit CD-75948. Date of issue: 25 August 2025. 2 pages, complete. Signed by the lead auditor.", "audit_attendance_sheet_CD-75948.pdf - Audit attendance sheet for internal audit CD-75948. Date of issue: 23 February 2026. 1 page. Signed by the lead auditor.", "file_0482.pdf - The file will not open, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "conditional", "defect": "document present (circumstance not stated), plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 934}} {"id": "isc-te-00224-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Uldvale plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "9 June 2026"}, "checklist": ["If the customer requests a credit limit above the standard cap, also: finance director sanction letter (issued within the last 1 months, signed)", "Trade references letter (issued within the last 3 months, signed)", "Credit reference agency report (issued within the last 3 months)", "Personal guarantee (signed)", "Bank reference letter (issued within the last 6 months, signed)", "Signed credit terms agreement (signed)", "Company registration certificate"], "submission": {"case": {"name": "Holthorpe Limited", "reference": "ES-61445", "details": ["The customer requests a credit limit above the standard cap."]}, "documents received": ["Trade references letter - Holthorpe Limited.pdf - Trade references letter about Holthorpe Limited, dated 3 April 2026. It is 1 page. It is signed by a director of the referee company.", "Bank reference letter - Holthorpe Limited.pdf - Bank reference letter about Holthorpe Limited, dated 14 March 2026. It is 1 page. It is signed by the bank manager.", "Credit reference agency report - Holthorpe Limited.pdf - Credit reference agency report about Holthorpe Limited, dated 26 May 2026. It is 6 pages, complete.", "Credit limit approval memo - Holthorpe Limited.pdf - Credit limit approval memo about Holthorpe Limited, dated 27 May 2026. It is 1 page. It is signed by the credit control manager.", "Signed credit terms agreement - Holthorpe Limited.pdf - Signed credit terms agreement about Holthorpe Limited, dated 31 March 2026. It is 4 pages, complete. It is signed by a director of Holthorpe Limited.", "Personal guarantee - Holthorpe Limited.pdf - Personal guarantee about Holthorpe Limited, dated 20 February 2026. It is 2 pages, complete. It is signed by the guarantor.", "Company registration certificate - Holthorpe Limited.pdf - Company registration certificate about Holthorpe Limited, dated 2 April 2026. It is 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 889}} {"id": "isc-te-00419-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Quelmere Inc", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "23 June 2026"}, "checklist": ["Passport, valid (not expired) on the date of the review: 23 June 2026.", "Three months of bank statements, issued within the last 3 months.", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months, signed.", "Mortgage application form, issued within the last 3 months, signed.", "Gifted deposit letter, issued within the last 3 months, signed."], "submission": {"case": {"name": "Freya Moskwick", "reference": "QS-74483", "details": ["The borrower is not self-employed."]}, "documents received": ["bank_statements_moskwick.pdf - Three months of bank statements for Freya Moskwick. They show a date of issue of 14 April 2026. 9 pages, complete.", "proof_of_deposit_savings_moskwick.pdf - Proof of deposit savings for Freya Moskwick. It shows a date of issue of 12 May 2026. 2 pages, complete.", "file_qs74483_07.pdf - The file will not open, so its contents cannot be seen.", "mortgage_application_form_moskwick.pdf - Mortgage application form for Freya Moskwick. It shows a date of issue of 2 April 2026. 10 pages, complete. It is signed by the borrower, Freya Moskwick.", "passport_moskwick.pdf - Passport for Freya Moskwick. It shows an expiry date of 21 August 2027. 2 pages, complete.", "gifted_deposit_letter_moskwick.pdf - Gifted deposit letter for Freya Moskwick. It shows a date of issue of 17 May 2026. It is a single page. It is signed by the donor of the gift."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 823}} {"id": "isc-te-00401-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Yondwell Limited", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "31 July 2026"}, "checklist": ["Inbound unloading record, issued within the last 1 months and signed.", "Transfer completion confirmation, issued within the last 1 months and signed.", "Seal number log, issued within the last 1 months and signed.", "Transfer manifest, signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet, issued within the last 1 months and signed.", "Outbound loading record, issued within the last 1 months and signed.", "Cross-dock slot booking sheet, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer MZ-75713", "reference": "QF-14367", "details": ["The transfer includes a temperature-controlled load."]}, "documents received": ["Seal number log for cross-dock transfer MZ-75713, dated 12 July 2026, 1 page. It is signed by the cross-dock supervisor.", "Transfer manifest for cross-dock transfer MZ-75713, dated 22 May 2026, 3 pages, complete. It is signed by the transport planner.", "Cross-dock chiller unit check sheet for cross-dock transfer MZ-75713, dated 28 July 2026, 1 page. It is signed by the refrigeration technician.", "Outbound loading record for cross-dock transfer MZ-75713, dated 25 July 2026, 1 page. It is signed by the outbound loading team leader.", "Damaged goods exception sheet for cross-dock transfer MZ-75713, dated 26 July 2026, 1 page. It is signed by the goods-in clerk.", "Cross-dock slot booking sheet for cross-dock transfer MZ-75713, dated 11 July 2026, 1 page. It is signed by the slot booking coordinator.", "Transfer completion confirmation for cross-dock transfer MZ-75713, dated 18 July 2026, 1 page. It is signed by the transport planner.", "Picking list for a single customer order on cross-dock transfer MZ-75713, dated 22 May 2026, 3 pages, complete. It is signed by the warehouse picker.", "Inbound unloading record for cross-dock transfer MZ-75713, dated 10 July 2026, 1 page. It is signed by the inbound unloading team leader."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 990}} {"id": "isc-te-00063-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ivrby Partners", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "15 July 2026"}, "checklist": ["Certificate of insurance, valid (not expired) on the date of the review.", "Supplier registration form, signed.", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed.", "Bank details confirmation letter, issued within the last 3 months, signed.", "Anti-bribery policy statement, signed.", "Company tax clearance certificate, valid (not expired) on the date of the review.", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid (not expired) on the date of the review."], "submission": {"case": {"name": "Corvcrest Ltd", "reference": "QW-68059", "details": ["The supplier is a domestic company.", "The supplier is a small business with a single owner."]}, "documents received": ["Copy of the owner's photo identification for Corvcrest Ltd. It shows an expiry date of 9 February 2028 and is a single page.", "Certificate of insurance for Corvcrest Ltd. It shows an expiry date of 18 July 2028. 2 pages, complete.", "Supplier declaration of no conflicts of interest for Corvcrest Ltd. It is dated 28 June 2026, is a single page, and is signed by an authorised representative of the supplier.", "Bank details confirmation letter for Corvcrest Ltd. It is dated 20 June 2026, is a single page, and is signed by the supplier's finance manager.", "Company tax clearance certificate for Corvcrest Ltd. It shows an expiry date of 29 December 2026 and is a single page.", "Anti-bribery policy statement for Corvcrest Ltd. It is dated 22 June 2026 and is signed by an authorised representative of the supplier. 2 pages, complete.", "Supplier registration form for Corvcrest Ltd. It is dated 24 April 2026 and is signed by an authorised representative of the supplier. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 862}} {"id": "isc-te-00247-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Faldmont GmbH", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "27 April 2026"}, "checklist": ["Rent book or rent payment schedule issued within the last 2 months.", "Benefit claim form that is valid, not expired, on the date of the review, signed.", "Current tenancy agreement, signed.", "Proof of identity that is valid, not expired, on the date of the review."], "submission": {"case": {"name": "Simon Holtani", "reference": "HP-46378"}, "documents received": ["Current tenancy agreement. The agreement is about Simon Holtani and shows its date of issue as 27 March 2026. 12 pages, complete. It is signed by the landlord.", "Benefit claim form. The form is about Simon Holtani and shows its expiry date as 9 May 2026. 12 pages, complete. It is signed by the claimant.", "Rent book or rent payment schedule. The document is about Simon Holtani and shows its date of issue as 4 April 2026. 4 pages, complete.", "Proof of identity. The document is about Simon Holtani and shows its expiry date as 4 July 2027. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 664}} {"id": "isc-te-00064-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Rondgard Ltd", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "8 June 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Visa entry requirement printout (issued within the last 3 months)", "Travel request form (signed)", "Flight itinerary quote (issued within the last 1 months)", "Hotel booking confirmation"], "submission": {"case": {"name": "business trip WO-61646", "reference": "UY-28386", "details": ["The traveller holds a passport of the destination country."]}, "documents received": ["Visa entry requirement printout for business trip WO-61646. It shows a date of issue of 14 May 2026. 2 pages, complete.", "Travel request form for business trip WO-61646. It shows a date of issue of 17 February 2026. 2 pages, complete. It is signed by the line manager.", "Flight itinerary quote for business trip WO-61646. It shows a date of issue of 28 May 2026. 2 pages, complete.", "File: scan-00246.pdf. The file will not open, so its contents cannot be seen.", "Hotel booking confirmation for business trip WO-61646. It shows a date of issue of 25 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Does the pack fully satisfy the checklist? Check every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not trust cover notes and labels blindly, as they may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-73", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 721}} {"id": "isc-te-00172-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Ebrwick plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "13 August 2026"}, "checklist": ["Alerting rules review note, issued within the last 3 months", "Root cause analysis report, issued within the last 3 months and signed", "Incident timeline, issued within the last 3 months", "Service level objective breach record, issued within the last 3 months", "Remediation items list, issued within the last 3 months and signed", "Customer impact statement, issued within the last 3 months"], "submission": {"case": {"name": "production incident RZ-3062", "reference": "KV-98742"}, "cover note": "Please find enclosed the postmortem pack for your review. A colleague of mine has already carried out a check of it. I am happy to answer any questions you may have.", "documents received": ["Root cause analysis report concerning production incident RZ-3062, dated 9 June 2026. 5 pages, complete. It is signed by the reliability engineering lead.", "Customer impact statement concerning production incident RZ-3062, dated 22 June 2022026. 2 pages, complete.", "Remediation items list concerning production incident RZ-3062, dated 26 May 2026. 2 pages, complete. It is signed by the reliability engineering lead.", "Alerting rules review note concerning production incident RZ-3062, dated 30 April 2026. 2 pages, complete.", "Service level objective breach record concerning production incident RZ-3062, dated 13 June 2026. 1 page.", "Incident timeline concerning production incident RZ-3062, dated 2 June 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00069-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Pellhurst BV", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "20 July 2026"}, "checklist": ["Benefit claim form, signed and valid (not expired) on the date of the review.", "Rent book or rent payment schedule, issued within the last 2 months.", "Proof of earnings, issued within the last 1 months.", "Current tenancy agreement, signed.", "Proof of savings, issued within the last 2 months.", "Proof of national insurance number.", "If the claimant is living in temporary accommodation arranged by the council, also: temporary accommodation placement letter."], "submission": {"case": {"name": "Giulia Paskock", "reference": "ZE-16894", "details": ["The claimant is living in ordinary private rented accommodation."]}, "documents received": ["Current tenancy agreement for Giulia Paskock. Date of issue: 11 June 2026. 12 pages, complete. Signed by the claimant and the landlord.", "Rent book or rent payment schedule for Giulia Paskock. Date of issue: 10 July 2026. 4 pages, complete.", "Proof of earnings for Giulia Paskock. Date of issue: 6 July 2026. 2 pages, complete.", "Proof of national insurance number for Giulia Paskock. Date of issue: 6 June 2026. Single page.", "Benefit claim form for Giulia Paskock. Expiry date: 23 May 2028. 12 pages, complete. Signed by the claimant.", "Proof of savings for Giulia Paskock. Date of issue: 8 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00069-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Pellhurst BV", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "20 July 2026"}, "checklist": ["Benefit claim form, signed and valid (not expired) on the date of the review.", "Rent book or rent payment schedule, issued within the last 2 months.", "Proof of earnings, issued within the last 1 months.", "Current tenancy agreement, signed.", "Proof of savings, issued within the last 2 months.", "Proof of national insurance number.", "If the claimant is living in temporary accommodation arranged by the council, also: temporary accommodation placement letter."], "submission": {"case": {"name": "Giulia Paskock", "reference": "ZE-16894", "details": ["The claimant is living in temporary accommodation arranged by the council."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["Proof of national insurance number for Giulia Paskock. Date of issue: 6 June 2026. Single page.", "Temporary accommodation placement letter for Giulia Paskock. Date of issue: 15 April 2026. 2 pages, complete.", "Current tenancy agreement for Giulia Paskock. Date of issue: 11 June 2026. 12 pages, complete. Signed by the claimant and the landlord.", "Benefit claim form for Giulia Paskock. Expiry date: 23 May 2028. 12 pages, complete. Signed by the claimant.", "Rent book or rent payment schedule for Giulia Paskock. Date of issue: 10 July 2026. 4 pages, complete.", "Proof of earnings for Giulia Paskock. Date of issue: 6 July 2026. 2 pages, complete.", "Recent bank statements for Giulia Paskock. Date of issue: 4 June 2026. 12 pages, complete.", "Proof of savings for Giulia Paskock. Date of issue: 8 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00404-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Oxlbury GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "11 August 2026"}, "checklist": ["Signed lease agreement, signed.", "Racking inspection report, issued within the last 12 months, signed.", "Planning permission.", "Asbestos survey.", "If the warehouse stores food products, also: food storage approval certificate, valid (not expired) on the date of the review.", "Utilities connection certificate."], "submission": {"case": {"name": "warehouse CF-86712", "reference": "NS-98453", "details": ["The warehouse stores no food products."]}, "documents received": ["lease-agreement-CF-86712.pdf — Signed lease agreement for warehouse CF-86712. Date of issue: 2 May 2026. 8 pages, complete. Signed by the landlord and Oxlbury GmbH.", "utilities-connection-certificate-CF-86712.pdf — Utilities connection certificate for warehouse CF-86712. Date of issue: 29 May 2026. 1 page.", "asbestos-survey-CF-86712.pdf — Asbestos survey for warehouse CF-86712. Date of issue: 5 May 2026. 5 pages, complete.", "planning-permission-CF-86712.pdf — Planning permission for warehouse CF-86712. Date of issue: 2 July 2026. 2 pages, complete.", "floor-load-capacity-report-CF-86712.pdf — Floor load capacity report for warehouse CF-86712. Date of issue: 20 July 2026. 3 pages, complete. Signed by the structural engineer.", "racking-inspection-report-CF-86712.pdf — Racking inspection report for warehouse CF-86712. Date of issue: 24 August 2025. 2 pages, complete. Signed by the racking inspector."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00447-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Delvheim SAS", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "10 August 2026"}, "checklist": ["Conference fee invoice, issued within the last 12 months", "Expense claim form, signed", "Currency conversion statement, issued within the last 6 months", "Taxi fare receipt, issued within the last 6 months", "Boarding pass stub", "Train ticket receipt"], "submission": {"case": {"name": "Thiago Sabock", "reference": "ML-97341"}, "documents received": ["Single-page conference fee invoice relating to Thiago Sabock, dated 28 May 2026.", "Expense claim form relating to Thiago Sabock, dated 31 May 2026. 2 pages, complete. Signed by the claiming employee, Thiago Sabock.", "Single-page taxi fare receipt relating to Thiago Sabock. The date of issue is smudged and cannot be read.", "Single-page currency conversion statement relating to Thiago Sabock, dated 13 May 2026.", "Single-page restaurant receipt relating to Thiago Sabock, dated 15 April 2026.", "Single-page boarding pass stub relating to Thiago Sabock, dated 3 July 2026.", "Single-page train ticket receipt relating to Thiago Sabock, dated 28 April 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 678}} {"id": "isc-te-00040-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Delvham BV", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "12 May 2026"}, "checklist": ["Seal number log, issued within the last 1 months and signed", "Load consolidation sheet, issued within the last 3 months and signed", "Cross-dock slot booking sheet, issued within the last 1 months and signed", "Outbound loading record, issued within the last 1 months and signed"], "submission": {"case": {"name": "cross-dock transfer QC-37927", "reference": "WU-40761"}, "documents received": ["Outbound loading record for cross-dock transfer QC-37927, dated 29 April 2026. Single page, signed by the outbound loading supervisor.", "Seal number log for cross-dock transfer QC-37927, dated 2 May 2026. Single page, signed by the dispatch supervisor.", "Load consolidation sheet for cross-dock transfer QC-37927, dated 9 March 2026. 2 pages, complete, signed by the load planner.", "Cross-dock slot booking sheet for cross-dock transfer QC-37927, dated 26 April 2026. Single page, signed by the slot booking coordinator.", "Damaged goods exception sheet for cross-dock transfer QC-37927, dated 23 April 2026. Single page, signed by the warehouse shift lead."]}}, "question": {"type": "choice", "instructions": "Determine whether the pack is complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Mark the pack complete if every applicable line is met (extra documents do not matter). Mark the pack incomplete if at least one applicable line is not met. Mark the pack unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-28", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 729}} {"id": "isc-te-00043-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Austmere LLP", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "2 September 2026"}, "checklist": ["Racking inspection report, issued within the last 12 months and signed.", "Signed lease agreement.", "Planning permission.", "Fire safety certificate, valid (not expired) on the date of the review.", "Asbestos survey."], "submission": {"case": {"name": "warehouse BB-20125", "reference": "KU-84726"}, "documents received": ["BB-20125_fire_safety_certificate_expires_2026-10-18.pdf. Fire safety certificate for warehouse BB-20125, with an expiry date of 18 October 2026, 2 pages, complete.", "BB-20125_planning_permission_2026-07-06.pdf. Planning permission for warehouse BB-20125, dated 6 July 2026, 2 pages, complete.", "BB-20125_racking_inspection_report_2026-05-28.pdf. Racking inspection report for warehouse BB-20125, dated 28 May 2026, 2 pages, complete. It is signed by the inspecting engineer.", "BB-20125_asbestos_survey_2026-05-17.pdf. Asbestos survey for warehouse BB-20125, dated 17 May 2026, 5 pages, complete.", "BB-20125_lease_agreement_2026-06-13.pdf. Signed lease agreement for warehouse BB-20125, dated 13 June 2026, 8 pages, complete. It is signed by the landlord and the tenant.", "BB-20125_floor_load_capacity_report_2026-06-29.pdf. Floor load capacity report for warehouse BB-20125, dated 29 June 2026, 3 pages, complete. It is signed by the structural engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 862}} {"id": "isc-te-00128-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskwick Group", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "3 April 2026"}, "checklist": ["Check that the pack contains a signed franchise agreement counterpart, signed.", "Check that the pack contains a franchise application form, signed.", "Check that the pack contains a funding agreement from a lender, signed and issued within the last 3 months.", "Check that the pack contains a training course completion certificate issued within the last 12 months.", "Check that the pack contains a fit-out cost estimate, signed and issued within the last 6 months.", "Check that the pack contains a pilot operation audit report, signed and issued within the last 6 months."], "submission": {"case": {"name": "Tondholm LLP", "reference": "WK-42460"}, "cover note": "I have put the pack together as best I can, but I am not sure everything needed is in there, so please check it carefully.", "documents received": ["Franchise application form concerning Tondholm LLP, dated 21 January 2026. 3 pages, complete. Signed by a partner of Tondholm LLP on behalf of the franchisee.", "Signed franchise agreement counterpart concerning Tondholm LLP, dated 12 December 2025. 12 pages, complete. Signed by the franchisor's authorised signatory.", "Pilot operation audit report concerning Tondholm LLP, dated 13 October 2025. 8 pages, complete. Signed by the pilot operation auditor.", "Funding agreement from a lender concerning Tondholm LLP, dated 11 February 2026. 6 pages, complete. Signed by the lender's authorised signatory.", "Training course completion certificate concerning Tondholm LLP, dated 12 November 2025. Single page.", "Franchise disclosure document receipt concerning Tondholm LLP, dated 30 March 2026. Single page. Signed by a partner of Tondholm LLP on behalf of the franchisee.", "Fit-out cost estimate concerning Tondholm LLP, dated 4 November 2025. 4 pages, complete. Signed by the fit-out contractor who prepared the estimate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 863}} {"id": "isc-te-00485-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskstead GmbH", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "28 August 2026"}, "checklist": ["Confirm the pack contains the signed draft lease, signed.", "Confirm the pack contains the title information document.", "Confirm the pack contains the energy performance certificate, valid (not expired) on the date of the review.", "Confirm the pack contains the keys handover receipt, signed.", "Confirm the pack contains the stamp duty return, signed.", "If the lease term is longer than seven years, also: land registration application, signed."], "submission": {"case": {"name": "premises MU-15688", "reference": "AJ-54933", "details": ["The lease term is longer than seven years."]}, "documents received": ["Stamp duty return. Premises MU-15688. Date of issue: 12 June 2026. 2 pages, complete. Signed by the tenant.", "Land registration application. Premises MU-15688. Date of issue: 21 May 2026. 2 pages, complete. Signed by the landlord.", "Energy performance certificate. Premises MU-15688. Expiry date: 15 December 2026. Single page.", "Signed draft lease. Premises MU-15688. Date of issue: 6 May 2026. 12 pages, complete. Signed by the landlord and the tenant.", "Title information document. Premises MU-15688. Date of issue: 10 August 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 745}} {"id": "isc-te-00439-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Boltfeld plc", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "4 August 2026"}, "checklist": ["Merchant account agreement, signed.", "Data protection impact assessment, issued within the last 12 months, signed.", "Fraud screening configuration sheet, signed.", "If the gateway will handle recurring subscription payments, also: subscription billing mandate template, signed.", "Gateway integration request form, signed.", "Test environment transaction log, issued within the last 1 months.", "Penetration test summary, issued within the last 6 months, signed."], "submission": {"case": {"name": "payment gateway DN-3787", "reference": "YB-55164", "details": ["The gateway will handle recurring subscription payments."]}, "documents received": ["Merchant account agreement for payment gateway DN-3787. Dated 11 June 2026. 6 pages, complete. Signed by the merchant account holder.", "Test environment transaction log for payment gateway DN-3787. Dated 20 July 2026. 4 pages, complete.", "Fraud screening configuration sheet for payment gateway DN-3787. Dated 27 April 2026. Single page. Signed by the fraud screening lead.", "Data protection impact assessment for payment gateway DN-3787. Dated 14 September 2025. 5 pages, complete. Signed by the data protection officer.", "Penetration test summary for payment gateway DN-3787. Dated 19 February 2026. 3 pages, complete. Signed by the penetration tester.", "Go-live sign-off certificate for payment gateway DN-3787. Dated 1 August 2026. Single page. Signed by the head of payments and IT security.", "Gateway integration request form for payment gateway DN-3787. Dated 4 June 2026. 2 pages, complete. Signed by the requesting manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 827}} {"id": "isc-te-00238-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Austmouth Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "11 August 2026"}, "checklist": ["If the borrower is self-employed, also: two most recent tax year overviews (issued within the last 18 months, signed)", "passport (valid (not expired) on the date of the review)", "gifted deposit letter (issued within the last 3 months, signed)", "mortgage application form (issued within the last 3 months, signed)", "three most recent payslips (issued within the last 3 months)"], "submission": {"case": {"name": "Charlotte Lovez", "reference": "OA-94851", "details": ["The borrower is not self-employed."]}, "documents received": ["Three most recent payslips for Charlotte Lovez, dated 7 August 2026. 3 pages, complete.", "Proof of deposit savings for Charlotte Lovez, dated 4 July 2026. 2 pages, complete.", "Passport for Charlotte Lovez, showing an expiry date of 15 December 2028. 2 pages, complete.", "Mortgage application form for Charlotte Lovez, dated 4 July 2026. 10 pages, complete, signed by the borrower.", "Gifted deposit letter for Charlotte Lovez, dated 3 June 2026. Single page; the signature block is covered by a sticky note, so it cannot be seen whether the letter is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 708}} {"id": "isc-te-00273-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Pravburg Group", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "11 May 2026"}, "checklist": ["Confirm the pack includes the final payroll cut-off note, issued within the last 1 months and signed.", "If the leaver is moving to a competitor, also: confidential data removal attestation, issued within the last 1 months and signed.", "Confirm the pack includes the shared mailbox handover record, issued within the last 1 months and signed.", "Confirm the pack includes the leaver notification form, signed.", "Confirm the pack includes the non-disclosure reminder acknowledgement, signed.", "Confirm the pack includes the line manager confirmation, issued within the last 1 months and signed.", "Confirm the pack includes the access rights inventory, issued within the last 1 months."], "submission": {"case": {"name": "Elena Ingmore", "reference": "CR-23529", "details": ["The leaver is not moving to a competitor."]}, "cover note": "Please find attached everything needed for this leaver pack, all complete.", "documents received": ["final payroll cut-off note – Elena Ingmore.pdf. A final payroll cut-off note concerning Elena Ingmore, dated 23 April 2026. It is a single page and is signed by the payroll manager.", "non-disclosure reminder acknowledgement – Elena Ingmore.pdf. A non-disclosure reminder acknowledgement concerning Elena Ingmore, dated 26 March 2026. It is a single page and is signed by Elena Ingmore.", "access rights inventory – Elena Ingmore.pdf. An access rights inventory concerning Elena Ingmore, dated 5 May 2026. It runs to 4 pages, complete.", "line manager confirmation – Elena Ingmore (unsigned copy).pdf. A line manager confirmation concerning Elena Ingmore, dated 23 April 2026. It is a single page and its signature line is empty, so it is not signed.", "equipment return receipt – Elena Ingmore.pdf. An equipment return receipt concerning Elena Ingmore, dated 30 April 2026. It is a single page and is signed by the asset coordinator.", "shared mailbox handover record – Elena Ingmore.pdf. A shared mailbox handover record concerning Elena Ingmore, dated 4 May 2026. It runs to 2 pages, complete, and is signed by the IT operations lead.", "leaver notification form – Elena Ingmore.pdf. A leaver notification form concerning Elena Ingmore, dated 30 March 2026. It runs to 2 pages, complete, and is signed by HR."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 952}} {"id": "isc-te-00183-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Pentmere BV", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "23 June 2026"}, "checklist": ["Final backup confirmation, issued within the last 3 months, signed.", "Licence reassignment note, issued within the last 3 months, signed.", "Data migration confirmation, issued within the last 3 months, signed.", "Network disconnection confirmation, issued within the last 1 months, signed.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server CA-57344", "reference": "IG-40941", "details": ["The server holds archived records that must be kept."]}, "documents received": ["Final backup confirmation for retired server CA-57344, dated 15 April 2026, single page, signed by the backup administrator.", "Dependent systems check report for retired server CA-57344, dated 12 May 2026, 3 pages, complete.", "Licence reassignment note for retired server CA-57344, dated 23 May 2026, single page, signed by the licence manager.", "Network disconnection confirmation for retired server CA-57344, dated 16 June 2026, single page, signed by the network operations engineer.", "Data migration confirmation for retired server CA-57344, dated 16 May 2026, 2 pages, complete, signed by the data migration lead.", "Archive retention confirmation for retired server CA-57344, dated 17 April 2026, 2 pages, complete, signed by the records manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 783}} {"id": "isc-te-00233-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Oxlfield SAS", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "6 March 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "Account request form, signed", "Content escalation route, signed", "Naming convention approval, signed"], "submission": {"case": {"name": "new social media account WD-87625", "reference": "WM-51560"}, "cover note": "Please find attached the pack for new social media account WD-87625, reference WM-51560. I am not certain that everything required is included, so let me know if anything else is needed before it goes live.", "documents received": ["Account request form WD-87625.pdf. This single-page account request form for new social media account WD-87625 shows its date of issue as 10 December 2025 and carries the signature of the marketing team lead.", "Content escalation route WD-87625.pdf. This single-page content escalation route for new social media account WD-87625 shows its date of issue as 15 November 2025 and carries the signature of the marketing team lead.", "Admin access list WD-87625.pdf. This single-page admin access list for new social media account WD-87625 shows its date of issue as 31 December 2025.", "Naming convention approval WD-87625.pdf. This single-page naming convention approval for new social media account WD-87625 shows its date of issue as 6 February 2026 and carries the signature of the brand governance manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 759}} {"id": "isc-te-00476-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Elstton Partners", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "13 August 2026"}, "checklist": ["Leave balance statement issued within the last 3 months.", "Completed annual leave request form, signed.", "Manager approval email issued within the last 2 months.", "Return to work date confirmation.", "Statutory holiday entitlement confirmation.", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave, signed.", "Team holiday planner extract."], "submission": {"case": {"name": "Khalid Sabnall", "reference": "ZF-30873", "details": ["The employee is not requesting leave during a known busy period."]}, "cover note": "Please approve this pack as soon as you can, as all the paperwork is in order. Thank you.", "documents received": ["Handover note for Khalid Sabnall, issued 9 May 2026. 2 pages, complete. Signed by the line manager.", "Return to work date confirmation for Khalid Sabnall, issued 16 July 2026. Single page.", "Manager approval email for Khalid Sabnall, issued 8 July 2026. Single page.", "Team holiday planner extract for Khalid Sabnall, issued 18 May 2026. 2 pages, complete.", "Poster about holiday rights for Khalid Sabnall, issued 1 June 2026. Single page.", "Leave balance statement for Khalid Sabnall, issued 16 June 2026. Single page.", "Completed annual leave request form for Khalid Sabnall, issued 19 June 2026. Single page, signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 766}} {"id": "isc-te-00449-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Yselfell Limited", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "3 July 2026"}, "checklist": ["Confirm the boarding pass stub is present.", "Confirm the expense claim form is present and signed.", "Confirm the hotel invoice is present and issued within the last 6 months.", "Confirm the conference fee invoice is present and issued within the last 12 months.", "If the claim exceeds the limit that requires director sign-off, also confirm the director approval slip is present, issued within the last 3 months and signed."], "submission": {"case": {"name": "Aoife Brodisey", "reference": "RQ-48538", "details": ["The claim exceeds the limit that requires director sign-off."]}, "documents received": ["Conference fee invoice - Aoife Brodisey.pdf - Conference fee invoice for Aoife Brodisey. Date of issue: 20 August 2025. 1 page.", "Expense claim form - Aoife Brodisey.pdf - Expense claim form for Aoife Brodisey. Date of issue: 19 May 2026. 2 pages, complete. Signed by the claiming employee.", "Hotel invoice - Aoife Brodisey.pdf - Hotel invoice for Aoife Brodisey. Date of issue: 7 June 2026. 2 pages, complete.", "Boarding pass stub - Aoife Brodisey.pdf - Boarding pass stub for Aoife Brodisey. Date of issue: 13 June 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete: every applicable line is met (extra documents do not matter). Reply incomplete: at least one applicable line is not met. Reply unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "variant-15", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 738}} {"id": "isc-te-00324-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Brenmont Partners", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "9 June 2026"}, "checklist": ["Shipping manifest, issued within the last 1 months", "Point of sale design proof, signed", "If the kit includes an electrical display unit, also: electrical safety test certificate, issued within the last 12 months", "Store installation guide", "Kit cost breakdown, issued within the last 3 months and signed", "Waste disposal plan"], "submission": {"case": {"name": "merchandising kit CY-19341", "reference": "ZV-32595", "details": ["The kit includes no electrical display unit."]}, "cover note": "I am sorry that this pack was put together in a rush. — Rafael Kipell", "documents received": ["Flammability test certificate - CY-19341.pdf — A flammability test certificate for merchandising kit CY-19341, dated 3 December 2025. 1 page.", "File - ZV-32595.pdf — The file will not open, so its contents cannot be seen.", "Store installation guide - CY-19341.pdf — A store installation guide for merchandising kit CY-19341. It is dated 5 April 2026. 6 pages, complete.", "Kit cost breakdown - CY-19341.pdf — A kit cost breakdown for merchandising kit CY-19341, dated 5 June 2026. 2 pages, complete. It is signed by the retail marketing team's finance contact.", "Brand colour specification - CY-19341.pdf — A brand colour specification for merchandising kit CY-19341, dated 2 June 2026. 1 page.", "Point of sale design proof - CY-19341.pdf — A point of sale design proof for merchandising kit CY-19341, dated 4 May 2026. 4 pages, complete. It carries a signature from the design studio's lead designer.", "Shipping manifest - CY-19341.pdf — A shipping manifest for merchandising kit CY-19341. It is dated 28 May 2026. 2 pages, complete.", "Waste disposal plan - CY-19341.pdf — A waste disposal plan for merchandising kit CY-19341, dated 11 May 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 955}} {"id": "isc-te-00041-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Creskheim & Co", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "23 April 2026"}, "checklist": ["Company registration certificate.", "Trade references letter, issued within the last 3 months, signed.", "Credit reference agency report, issued within the last 3 months.", "If the customer is a newly incorporated company, also: director identification record, signed.", "Bank reference letter, issued within the last 6 months, signed.", "Signed credit terms agreement, signed.", "Credit limit approval memo, issued within the last 1 months, signed.", "If the customer requests a credit limit above the standard cap, also: finance director sanction letter, issued within the last 1 months, signed."], "submission": {"case": {"name": "Ivrfeld & Co", "reference": "QG-16044", "details": ["The customer is a newly incorporated company.", "The customer requests a credit limit above the standard cap."]}, "cover note": "Please find attached the credit account pack for reference QG-16044. Everything needed is attached and complete.", "documents received": ["Signed credit terms agreement for Ivrfeld & Co. Date of issue: 1 January 2026. 4 pages, complete. Signed by the customer.", "Finance director sanction letter for Ivrfeld & Co. Date of issue: 5 April 2026. Single page. Signed by the finance director.", "Credit reference agency report for Ivrfeld & Co. Date of issue: 17 April 2026. 6 pages, complete.", "Bank statement showing the applicant's balance for Ivrfeld & Co. Date of issue: 2 April 2026. Single page. Signed by the bank manager.", "Director identification record for Ivrfeld & Co. Date of issue: 5 January 2026. 2 pages, complete. Signed by a director.", "Trade references letter for Ivrfeld & Co. Date of issue: 3 April 2026. Single page. Signed by the referee.", "Credit limit approval memo for Ivrfeld & Co. Date of issue: 14 April 2026. Single page. Signed by the credit manager.", "Company registration certificate for Ivrfeld & Co. Date of issue: 23 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete when every applicable line is met (extra documents do not matter). Return incomplete when at least one applicable line is not met. Return unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-29", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 906}} {"id": "isc-te-00138-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Orrmark & Co", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "6 March 2026"}, "checklist": ["Audit agenda, signed", "Open corrective action list, issued within the last 1 months, signed", "Document control list, issued within the last 3 months, signed", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary, issued within the last 3 months, signed", "Audit scope statement, signed"], "submission": {"case": {"name": "customer audit visit WK-33681", "reference": "CB-79631", "details": ["The customer auditor does not request access to sub-tier supplier records."]}, "cover note": "Everything needed is attached and complete.", "documents received": ["Document control list for customer audit visit WK-33681. Date of issue: 24 February 2026. Pages 1 to 4 are included; the total number of pages is not shown anywhere. Signed by the quality management office lead.", "Audit scope statement for customer audit visit WK-33681. Date of issue: 21 November 2025. Single page, signed by the quality management office lead.", "Audit agenda for customer audit visit WK-33681. Date of issue: 23 November 2025. Single page, signed by the quality management office lead.", "Open corrective action list for customer audit visit WK-33681. Date of issue: 20 February 2026. 2 pages, complete. Signed by the quality management office lead."]}}, "question": {"type": "choice", "instructions": "The question to answer is whether the pack stands complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "variant-63", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 752}} {"id": "isc-te-00018-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silthorpe Group", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "15 April 2026"}, "checklist": ["Customer account details page, issued within the last 3 months", "Terms of sale acceptance log, issued within the last 12 months", "Customer order history extract, issued within the last 6 months", "Transaction record printout, issued within the last 3 months", "Fraud screening result sheet, issued within the last 3 months", "Chargeback response form, signed"], "submission": {"case": {"name": "disputed transaction NP-25742", "reference": "HU-11985"}, "documents received": ["Scanned terms of sale acceptance log for disputed transaction NP-25742, dated 29 March 2026. 1 page.", "Scanned fraud screening result sheet for disputed transaction NP-25742, dated 9 April 2026. 1 page.", "Scanned customer order history extract for disputed transaction NP-25742, dated 21 January 2026. 2 pages, complete.", "Scanned chargeback response form for disputed transaction NP-25742, dated 9 April 2026. 2 pages, complete. Signed by the payments disputes team supervisor.", "Scanned transaction record printout for disputed transaction NP-25742, dated 13 February 2026. 1 page.", "Scanned customer account details page for disputed transaction NP-25742, dated 17 February 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and say whether it is complete. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-47", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 753}} {"id": "isc-te-00149-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Xanheim GmbH", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "7 May 2026"}, "checklist": ["Pension contribution certificate, issued within the last 13 months", "Rental income record", "Employment income summary, issued within the last 13 months", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Bank interest statement, issued within the last 13 months"], "submission": {"case": {"name": "household tax affairs WG-34056", "reference": "EP-63392", "details": ["The household sold no property other than its main home during the tax year."]}, "documents received": ["Employment income summary.pdf - Employment income summary for household tax affairs WG-34056. Its date of issue is 18 August 2025. 2 pages, complete.", "Capital gains asset record.pdf - Capital gains asset record for household tax affairs WG-34056. Its date of issue is 8 February 2026. 2 pages, complete.", "Childcare payment receipt.pdf - Childcare payment receipt for household tax affairs WG-34056. Its date of issue is 13 March 2026. 1 page.", "Bank interest statement.pdf - Bank interest statement for household tax affairs WG-34056. Its date of issue is 30 April 2025. 3 pages, complete.", "File_07.pdf - The contents of this file cannot be seen: the scan is blank and too faint to read.", "Rental income record.pdf - Rental income record for household tax affairs WG-34056. Its date of issue is 27 January 2026. 4 pages, complete.", "Pension contribution certificate.pdf - Pension contribution certificate for household tax affairs WG-34056. Its date of issue is 21 June 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00199-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silridge Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "18 March 2026"}, "checklist": ["Delegate photo identification that is valid, meaning not expired, on the date of the review.", "Cancellation policy acceptance, signed.", "Special requirements note.", "Employer sponsorship letter issued within the last 3 months, signed.", "Venue access instructions issued within the last 3 months.", "If the course leads to a licensed qualification, also: licence eligibility declaration, signed.", "Prerequisite certificate."], "submission": {"case": {"name": "course booking PG-59381", "reference": "XR-38194", "details": ["The course does not lead to a licensed qualification."]}, "documents received": ["Prerequisite certificate, course booking PG-59381. Issued 16 December 2025. 1 page.", "Delegate photo identification, course booking PG-59381. The identification expires on 28 November 2026. 1 page.", "Cancellation policy acceptance, course booking PG-59381. Issued 7 February 2026. Signed by the delegate. 1 page.", "Course booking form, course booking PG-59381. Issued 28 November 2025. 2 pages, complete. Signed by the delegate. 1 page.", "Special requirements note, course booking PG-59381. Issued 26 January 2026. 1 page.", "Venue access instructions, course booking PG-59381. Issued 13 February 2026. 1 page.", "Employer sponsorship letter, course booking PG-59381. Issued 7 March 2026. Signed by the employer's authorised signatory. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 792}} {"id": "isc-te-00386-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Orrston BV", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "18 May 2026"}, "checklist": ["Signed trial period proposal", "Line manager opinion note, signed and issued within the last 2 months", "Current working pattern statement issued within the last 3 months", "Previous flexible working requests record issued within the last 24 months", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed", "If the request is to work entirely from home, also: home working equipment checklist, signed"], "submission": {"case": {"name": "Daan Kerrridge", "reference": "XS-33835", "details": ["The employee has caring responsibilities for a dependent.", "The request is not to work entirely from home."]}, "cover note": "Could you approve this as quickly as possible? All the paperwork is in order.", "documents received": ["Impact assessment on the team - Daan Kerrridge.pdf - Impact assessment on the team concerning Daan Kerrridge, dated 7 February 2026. It is 3 pages, complete, and is signed by the line manager.", "Trial period proposal - Daan Kerrridge.pdf - Trial period proposal concerning Daan Kerrridge, dated 27 March 2026. It is 1 page and is signed by the line manager.", "Record of another employee's request - Daan Kerrridge.pdf - Record of a request concerning Daan Kerrridge made by another employee, dated 28 April 2026. It is 1 page.", "Caring responsibilities statement - Daan Kerrridge.pdf - Caring responsibilities statement concerning Daan Kerrridge, dated 8 May 2026. It is 1 page and is signed by Daan Kerrridge.", "Line manager opinion note - Daan Kerrridge.pdf - Line manager opinion note concerning Daan Kerrridge, dated 10 May 2026. It is 2 pages, complete, and is signed by the line manager.", "Current working pattern statement - Daan Kerrridge.pdf - Current working pattern statement concerning Daan Kerrridge, dated 10 April 2026. It is 1 page.", "Proposed working pattern plan - Daan Kerrridge.pdf - Proposed working pattern plan concerning Daan Kerrridge, dated 9 May 2026. It is 2 pages, complete, and is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 904}} {"id": "isc-te-00020-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Belmburg GmbH", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "3 March 2026"}, "checklist": ["Lifting equipment inspection report, issued within the last 6 months and signed", "Parking bay suspension approval, issued within the last 1 months and signed", "New floor snagging list, issued within the last 1 months and signed", "Signed move plan", "IT decommissioning certificate, issued within the last 1 months and signed"], "submission": {"case": {"name": "office move project AZ-40366", "reference": "NC-30638"}, "documents received": ["Furniture inventory list for office move project AZ-40366. Date of issue: 25 February 2026. 4 pages, complete. Signed by the facilities coordinator.", "Signed move plan for office move project AZ-40366. Date of issue: 25 February 2026. 6 pages, complete. Signed by the project manager.", "Parking bay suspension approval for office move project AZ-40366. Date of issue: 25 February 2026. 1 page. Signed by the traffic management officer.", "IT decommissioning certificate for office move project AZ-40366. Date of issue: 14 February 2026. 1 page. Signed by the IT manager.", "Crate hire agreement for office move project AZ-40366. Date of issue: 10 February 2026. 2 pages, complete. Signed by the crate hire supplier's representative.", "Lifting equipment inspection report for office move project AZ-40366. Date of issue: 27 November 2025. 2 pages, complete. Signed by the lifting equipment inspector.", "New floor snagging list for office move project AZ-40366. Date of issue: 21 February 2026. 3 pages, complete. Signed by the site manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 831}} {"id": "isc-te-00451-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Kerrmore & Co", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "20 March 2026"}, "checklist": ["Asset register update, issued within the last 1 months.", "Licence reassignment note, issued within the last 3 months, signed.", "Decommission request form, signed.", "Data migration confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server HL-31798", "reference": "GT-43265"}, "documents received": ["asset-register-update-HL-31798.pdf. Asset register update about retired server HL-31798. Date of issue: 5 March 2026. 1 page.", "licence-invoice-HL-31798.pdf. Licence invoice about retired server HL-31798. Date of issue: 3 March 2026. 1 page. Signed by the vendor sales representative.", "data-migration-confirmation-HL-31798.pdf. Data migration confirmation about retired server HL-31798. Date of issue: 7 March 2026. 2 pages, complete. Signed by the data migration lead.", "dependent-systems-check-report-HL-31798.pdf. Dependent systems check report about retired server HL-31798. Date of issue: 3 February 2026. 3 pages, complete.", "decommission-request-form-HL-31798.pdf. Decommission request form about retired server HL-31798. Date of issue: 29 November 2025. 2 pages, complete. Signed by the requesting team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 772}} {"id": "isc-te-00279-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Yondbury LLP", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "9 March 2026"}, "checklist": ["Outstanding receipts list", "Bank reconciliation statement, signed", "Bank statement for the period, issued within the last 2 months", "If the reconciliation shows an unexplained difference that is not an outstanding item, also: unexplained difference investigation note, signed", "General ledger cash account listing", "Outstanding payments list"], "submission": {"case": {"name": "company bank account HK-23180", "reference": "KP-23420"}, "documents received": ["Bank statement for the period for company bank account HK-23180, dated 15 February 2026. 4 pages, complete.", "Bank reconciliation statement for company bank account HK-23180, dated 22 January 2026. 2 pages, complete. Signed by the financial controller.", "Unexplained difference investigation note for company bank account HK-23180, dated 2 January 2026. 2 pages, complete. Signed by the preparer.", "General ledger cash account listing for company bank account HK-23180, dated 28 February 2026. 3 pages, complete.", "Outstanding receipts list for company bank account HK-23180, dated 12 November 2025. 1 page.", "Outstanding payments list for company bank account HK-23180, dated 4 March 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 732}} {"id": "isc-te-00433-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Yselburg Partners", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "1 April 2026"}, "checklist": ["Confirm the cost-benefit justification is included.", "Confirm the installation requirements note is included.", "Confirm the vendor quotation is included, issued within the last 3 months.", "Confirm the maintenance plan is included."], "submission": {"case": {"name": "equipment FH-21730", "reference": "QM-98274"}, "cover note": "Dear committee, please find attached the approval pack for equipment FH-21730, reference QM-98274, for your review. A colleague of mine has already checked the pack before sending it on. Kind regards, Daan Aldmore", "documents received": ["grant fund eligibility note FH-21730.pdf — A single-page grant fund eligibility note for equipment FH-21730, dated 12 December 2025. It is signed by the grants officer.", "installation requirements note FH-21730.pdf — An installation requirements note for equipment FH-21730, dated 17 February 2026. 2 pages, complete.", "cost-benefit justification FH-21730.pdf — A cost-benefit justification for equipment FH-21730, dated 21 December 2025. 3 pages, complete.", "vendor quotation FH-21730.pdf — A vendor quotation for equipment FH-21730, dated 5 February 2026. 2 pages, complete.", "maintenance plan FH-21730.pdf — A maintenance plan for equipment FH-21730, dated 7 March 2026. Pages 1-1 of 2 are included."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 781}} {"id": "isc-te-00296-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Corvwald GmbH", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "2 April 2026"}, "checklist": ["Statutory holiday entitlement confirmation is enclosed.", "Signed handover note is enclosed.", "Team holiday planner extract is enclosed.", "Manager approval email is enclosed, issued within the last 2 months.", "Leave balance statement is enclosed, issued within the last 3 months."], "submission": {"case": {"name": "Kayla Ostcombe", "reference": "KW-71803"}, "documents received": ["Job description with no handover information for Kayla Ostcombe, dated 9 February 2026. 2 pages, complete. Signed by the HR manager.", "Team holiday planner extract for Kayla Ostcombe, dated 11 December 2025. 2 pages, complete.", "Manager approval email for Kayla Ostcombe, dated 16 February 2026. 1 page.", "Leave balance statement for Kayla Ostcombe, dated 20 January 2026. 1 page.", "Statutory holiday entitlement confirmation for Kayla Ostcombe, dated 16 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 644}} {"id": "isc-te-00324-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Brenmont Partners", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "9 June 2026"}, "checklist": ["Shipping manifest, issued within the last 1 months", "Point of sale design proof, signed", "If the kit includes an electrical display unit, also: electrical safety test certificate, issued within the last 12 months", "Store installation guide", "Kit cost breakdown, issued within the last 3 months and signed", "Waste disposal plan"], "submission": {"case": {"name": "merchandising kit CY-19341", "reference": "ZV-32595"}, "documents received": ["Waste disposal plan - CY-19341.pdf — A waste disposal plan for merchandising kit CY-19341, dated 11 May 2026. 1 page.", "Kit cost breakdown - CY-19341.pdf — A kit cost breakdown for merchandising kit CY-19341, dated 5 June 2026. 2 pages, complete. It is signed by the retail marketing team's finance contact.", "Point of sale design proof - CY-19341.pdf — A point of sale design proof for merchandising kit CY-19341, dated 4 May 2026. 4 pages, complete. It carries a signature from the design studio's lead designer.", "Store installation guide - CY-19341.pdf — A store installation guide for merchandising kit CY-19341. It is dated 5 April 2026. 6 pages, complete.", "Shipping manifest - CY-19341.pdf — A shipping manifest for merchandising kit CY-19341. It is dated 28 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00003-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Quorfell Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "18 June 2026"}, "checklist": ["Check that the pack includes a signed post-change test plan.", "Check that the pack includes a current rule set export issued within the last 1 month.", "Check that the pack includes a signed firewall change request form.", "Check that the pack includes a peer review checklist issued within the last 1 month and signed."], "submission": {"case": {"name": "firewall change JC-89924", "reference": "GT-12592"}, "documents received": ["jc-89924_peer_review_checklist.pdf. Peer review checklist for firewall change JC-89924, dated 2 June 2026. Single page. Signed by the reviewing network security analyst.", "jc-89924_firewall_change_request_form_v1.pdf. Firewall change request form for firewall change JC-89924, dated 15 March 2026. 3 pages, complete. The signature line is empty, so the form is not signed.", "jc-89924_post-change_test_plan.pdf. Post-change test plan for firewall change JC-89924, dated 16 May 2026. 2 pages, complete. Signed by the lead network security engineer.", "jc-89924_current_rule_set_export.pdf. Current rule set export for firewall change JC-89924, dated 5 June 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every checklist line relevant to this case. A required document only counts if it is the kind of document listed (not a similar one), concerns the subject of the case, contains all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. Say complete: every applicable line is met (extra documents do not matter). Say incomplete: at least one applicable line is not met. Say unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "variant-14", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 730}} {"id": "isc-te-00178-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Aldford Inc", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "21 May 2026"}, "checklist": ["Restaurant receipt issued within the last 6 months", "Hotel invoice issued within the last 6 months", "Conference fee invoice issued within the last 12 months", "Taxi fare receipt issued within the last 6 months"], "submission": {"case": {"name": "Amelia Paskez", "reference": "EQ-72163"}, "documents received": ["Taxi fare receipt.pdf. A single-page taxi fare receipt concerning Amelia Paskez, showing its date of issue as 9 May 2026.", "Document.pdf. The contents of this file cannot be seen, as the scan is blank and too faint to read.", "Hotel invoice.pdf. A hotel invoice concerning Amelia Paskez, showing its date of issue as 27 January 2026. All 2 of its 2 pages are included, complete.", "Conference fee invoice.pdf. A single-page conference fee invoice concerning Amelia Paskez, showing its date of issue as 19 April 2026.", "Restaurant receipt.pdf. A single-page restaurant receipt concerning Amelia Paskez, showing its date of issue as 20 March 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when checked against the checklist? Go through each checklist line that applies to this case. A required document counts only when it is the kind of document listed (not a similar one), concerns the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued inside the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: at least one applicable line is not satisfied. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-39", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 658}} {"id": "isc-te-00178-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Aldford Inc", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "21 May 2026"}, "checklist": ["Restaurant receipt issued within the last 6 months", "Hotel invoice issued within the last 6 months", "Conference fee invoice issued within the last 12 months", "Taxi fare receipt issued within the last 6 months"], "submission": {"case": {"name": "Amelia Paskez", "reference": "EQ-72163"}, "documents received": ["Restaurant receipt.pdf. A single-page restaurant receipt concerning Amelia Paskez, showing its date of issue as 20 March 2026.", "Taxi fare receipt.pdf. A single-page taxi fare receipt concerning Amelia Paskez, showing its date of issue as 9 May 2026.", "Hotel invoice.pdf. A hotel invoice concerning Amelia Paskez, showing its date of issue as 27 January 2026. All 2 of its 2 pages are included, complete.", "Conference fee invoice.pdf. A single-page conference fee invoice concerning Amelia Paskez, showing its date of issue as 19 April 2026."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 442}} {"id": "isc-te-00012-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Wendhaven Inc", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "27 July 2026"}, "checklist": ["Photo identification, valid (not expired) on the date of the review: present", "Fraud questionnaire, signed: present", "Signature verification record, signed: present", "Card replacement request form, signed: present", "Delivery address confirmation, signed: present", "Confirmation of contact details, issued within the last 3 months: present"], "submission": {"case": {"name": "Lin Yellmore", "reference": "BW-71574"}, "cover note": "Please find attached the file for cardholder Lin Yellmore, reference BW-71574. Everything needed is attached and complete, and I would be grateful if the team could review it. Kind regards, Matthias Aldow", "documents received": ["Signature verification record - Lin Yellmore.pdf — Signature verification record for Lin Yellmore, dated 26 April 2026, single page. It is signed by the bank officer who carried out the verification.", "Fraud questionnaire - Lin Yellmore.pdf — Fraud questionnaire for Lin Yellmore, dated 6 July 2026. 2 pages, complete. It is signed by the cardholder.", "Account statement - Lin Yellmore.pdf — Account statement showing recent activity for Lin Yellmore, dated 23 July 2026. 3 pages, complete.", "Confirmation of contact details - Lin Yellmore.pdf — Confirmation of contact details for Lin Yellmore, dated 4 July 2026, single page.", "Delivery address confirmation - Lin Yellmore.pdf — Delivery address confirmation for Lin Yellmore, dated 24 May 2026, single page. It is signed by the cardholder.", "Card replacement request form - Lin Yellmore.pdf — Card replacement request form for Lin Yellmore, dated 23 April 2026. 2 pages, complete. It is signed by the cardholder.", "Photo identification - Lin Yellmore.pdf — Photo identification for Lin Yellmore, single page. The expiry date on the document is smudged and cannot be read."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 671}} {"id": "isc-te-00447-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Delvheim SAS", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "10 August 2026"}, "checklist": ["Conference fee invoice, issued within the last 12 months", "Expense claim form, signed", "Currency conversion statement, issued within the last 6 months", "Taxi fare receipt, issued within the last 6 months", "Boarding pass stub", "Train ticket receipt"], "submission": {"case": {"name": "Thiago Sabock", "reference": "ML-97341"}, "documents received": ["Single-page currency conversion statement relating to Thiago Sabock, dated 13 May 2026.", "Single-page train ticket receipt relating to Thiago Sabock, dated 28 April 2026.", "Hotel invoice relating to Thiago Sabock, dated 30 April 2026. 2 pages, complete.", "Expense claim form relating to Thiago Sabock, dated 31 May 2026. 2 pages, complete. Signed by the claiming employee, Thiago Sabock.", "Single-page conference fee invoice relating to Thiago Sabock, dated 28 May 2026.", "Single-page restaurant receipt relating to Thiago Sabock, dated 15 April 2026.", "Single-page taxi fare receipt relating to Thiago Sabock. The date of issue is smudged and cannot be read.", "Single-page boarding pass stub relating to Thiago Sabock, dated 3 July 2026."]}}, "question": {"type": "choice", "instructions": "The decision to make is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves, not the notes.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-43", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 714}} {"id": "isc-te-00347-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Vaskcliff SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "16 April 2026"}, "checklist": ["Check that the customer contact details sheet is present and signed.", "Check that the terms and conditions acceptance sheet is present and signed.", "Check that the identity verification document is present and valid, meaning not expired, on the date of the review.", "Check that the initial points balance statement is present and was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also check the points transfer evidence statement, which must have been issued within the last 3 months and be signed.", "Check that the marketing consent form is present and signed.", "Check that the nominated store preference form is present and signed."], "submission": {"case": {"name": "Eoin Natwick", "reference": "KR-35713", "details": ["The customer is not transferring points from any other scheme."]}, "documents received": ["initial_points_balance_statement_natwick.pdf. Initial points balance statement for Eoin Natwick, dated 6 April 2026. It is a single page.", "points_transfer_request_natwick.pdf. Points transfer request for Eoin Natwick, dated 24 January 2026. A single page, signed by the customer.", "customer_contact_details_sheet_natwick.pdf. Customer contact details sheet for Eoin Natwick, dated 1 January 2026. A single page, signed by the customer.", "identity_verification_document_natwick_04.pdf. Identity verification document for Eoin Natwick, showing an expiry date of 2 May 2026. It is a single page.", "nominated_store_preference_form_natwick.pdf. Nominated store preference form for Eoin Natwick, dated 25 February 2026. A single page, signed by the customer.", "terms_and_conditions_acceptance_sheet_natwick.pdf. Terms and conditions acceptance sheet for Eoin Natwick, dated 22 February 2026. A single page, signed by the customer.", "identity_verification_document_natwick_05.pdf. Identity verification document for Eoin Natwick, showing an expiry date of 8 April 2025. It is a single page.", "marketing_consent_form_natwick.pdf. Marketing consent form for Eoin Natwick, dated 22 January 2026. A single page, signed by the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 913}} {"id": "isc-te-00411-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Halvlock LLP", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "10 June 2026"}, "checklist": ["Account closure procedure included in the pack", "Naming convention approval included, signed", "Account purpose statement included in the pack", "Platform terms acceptance record included, signed", "Two-factor authentication confirmation included, issued within the last 3 months"], "submission": {"case": {"name": "new social media account XD-69957", "reference": "JN-26543"}, "documents received": ["two-factor-authentication-confirmation-XD-69957.pdf. This is the two-factor authentication confirmation for new social media account XD-69957, dated 28 March 2026. It is a single page.", "platform-terms-acceptance-record-XD-69957.pdf. This is the platform terms acceptance record for new social media account XD-69957, dated 23 April 2026, and it is a single page. It has been signed by the account owner.", "follower-growth-target-spreadsheet-XD-69957.pdf. This is a follower growth target spreadsheet for new social media account XD-69957, dated 4 May 2026. It is a single page.", "account-closure-procedure-XD-69957.pdf. This is the account closure procedure for new social media account XD-69957, dated 2 June 2026. It is a single page.", "naming-convention-approval-XD-69957.pdf. This is the naming convention approval for new social media account XD-69957, dated 27 April 2026, and it is a single page. It has been signed by the social media governance team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00255-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Yselmoor Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "28 August 2026"}, "checklist": ["Customer contact details sheet (signed)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Loyalty scheme enrolment form (signed)", "Marketing consent form (signed)", "Initial points balance statement (issued within the last 3 months)", "Identity verification document (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Camille Rookett", "reference": "EV-96904", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Identity verification document for Camille Rookett. It is a single page. It shows an expiry date of 21 December 2028.", "Marketing consent form for Camille Rookett. It is dated 30 April 2026 and is a single page. It is signed by the member, Camille Rookett.", "Initial points balance statement for Camille Rookett. It is dated 17 July 2026 and is a single page. It shows the member's starting points balance.", "Loyalty scheme enrolment form for Camille Rookett. It is dated 9 May 2026 and is a single page. It is signed by the member, Camille Rookett."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 712}} {"id": "isc-te-00106-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Faldmark Ltd", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "6 April 2026"}, "checklist": ["Obtain the product catalogue declaration, signed.", "Obtain proof of trading address, issued within the last 3 months.", "If the seller is a sole trader rather than a company, also obtain the sole trader statutory declaration, signed.", "Obtain the authorised representative ID copy, valid (not expired) on the date of the review.", "Obtain the business registration certificate.", "Obtain the tax registration letter.", "If the seller intends to list food or cosmetic products, also obtain the safety compliance certificate, issued within the last 12 months."], "submission": {"case": {"name": "Kestcombe LLP", "reference": "JX-13298", "details": ["The seller is a sole trader rather than a company.", "The seller does not intend to list food or cosmetic products."]}, "cover note": "Please find attached everything needed for this pack; all items are enclosed and complete.", "documents received": ["tax_registration_letter_NesklundLimited.pdf — Tax registration letter in the name of Nesklund Limited, dated 23 March 2026. 1 page.", "authorised_representative_ID_copy_KestcombeLLP.pdf — Authorised representative ID copy for Kestcombe LLP, showing an expiry date of 8 July 2028. 1 page.", "anti_money_laundering_questionnaire_KestcombeLLP.pdf — Anti-money laundering questionnaire for Kestcombe LLP, dated 25 December 2025. 3 pages, complete. It is signed by an authorised signatory of Kestcombe LLP.", "business_registration_certificate_KestcombeLLP.pdf — Business registration certificate for Kestcombe LLP, dated 10 March 2026. 1 page.", "sole_trader_statutory_declaration_KestcombeLLP.pdf — Sole trader statutory declaration for Kestcombe LLP, dated 26 December 2025. 1 page. It is signed by the declarant, the sole trader of Kestcombe LLP.", "product_catalogue_declaration_KestcombeLLP.pdf — Product catalogue declaration for Kestcombe LLP, dated 7 January 2026. 4 pages, complete. It is signed by an authorised signatory of Kestcombe LLP.", "proof_of_trading_address_KestcombeLLP.pdf — Proof of trading address for Kestcombe LLP, dated 28 February 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 932}} {"id": "isc-te-00125-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Fravberg LLP", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "6 April 2026"}, "checklist": ["Check for a signed stamp duty return.", "Check for a company search report issued within the last 1 months.", "If the lease term is longer than seven years, also check for a signed land registration application.", "Check for a signed guarantor consent letter.", "If the tenant is a newly formed company, also check for a signed parent company guarantee (signed).", "Check for a signed draft lease."], "submission": {"case": {"name": "premises AA-3696", "reference": "GR-61853", "details": ["The lease term is longer than seven years.", "The tenant is a newly formed company."]}, "documents received": ["Company search report - premises AA-3696.pdf — Company search report for premises AA-3696, dated 26 March 2026. 2 pages, complete.", "Guarantor consent letter - premises AA-3696.pdf — Guarantor consent letter for premises AA-3696, dated 2 March 2026. 1 page. Signed by the guarantor.", "Land registration application - premises AA-3696.pdf — Land registration application for premises AA-3696, dated 3 January 2026. 2 pages, complete. Signed by the landlord's solicitor.", "Draft lease - premises AA-3696.pdf — Signed draft lease for premises AA-3696, dated 18 December 2025. 12 pages, complete. Signed by the landlord and the tenant.", "Stamp duty return - premises AA-3696.pdf — Stamp duty return for premises AA-3696, dated 8 January 2026. 2 pages, complete. Signed by the tenant.", "Parent company guarantee - premises AA-3696.pdf — Signed parent company guarantee for premises AA-3696, dated 1 January 2026. 3 pages, complete. Signed by a director of the parent company."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 850}} {"id": "isc-te-00379-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Eskhall SAS", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "8 July 2026"}, "checklist": ["If the seller intends to list food or cosmetic products, also include: safety compliance certificate (issued within the last 12 months)", "Include: proof of trading address (issued within the last 3 months)", "Include: tax registration letter", "Include: bank account verification letter (issued within the last 3 months, signed)", "Include: anti-money laundering questionnaire (signed)", "Include: business registration certificate", "Include: authorised representative ID copy (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Hondhall plc", "reference": "TW-57851", "details": ["The seller intends to list food or cosmetic products."]}, "documents received": ["Business registration certificate – Hondhall plc. Date of issue: 28 April 2026. 1 page.", "Bank account verification letter – Hondhall plc. Date of issue: 17 May 2026. 1 page. Signed by the bank's account manager.", "Tax registration letter – Hondhall plc. Date of issue: 12 May 2026. 1 page.", "Proof of trading address – Hondhall plc. Date of issue: 30 May 2026. 1 page.", "Anti-money laundering questionnaire – Hondhall plc. Date of issue: 23 March 2026. 3 pages, complete. Signed by the company's compliance officer.", "Authorised representative ID copy – Hondhall plc. Expiry date: 18 December 2028. 1 page.", "Returns policy statement – Hondhall plc. Date of issue: 12 March 2026. 2 pages, complete. Signed by the company's authorised representative."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every checklist line relevant to this case. A required document only counts if it is the kind of document listed (not a similar one), concerns the subject of the case, contains all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. Say complete: every applicable line is met (extra documents do not matter). Say incomplete: at least one applicable line is not met. Say unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-14", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 791}} {"id": "isc-te-00236-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Haskmont Group", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "4 March 2026"}, "checklist": ["Scaffolding agreement, signed", "Insurance notification letter, issued within the last 6 months", "Meter reading photo, issued within the last 1 months", "Grid connection application, issued within the last 12 months, signed", "Planning permission letter, issued within the last 12 months"], "submission": {"case": {"name": "roof OS-53775", "reference": "WL-45574"}, "documents received": ["Electricity bill direct debit mandate for roof OS-53775, dated 22 November 2025. 2 pages, complete. Signed by the account holder.", "Planning permission letter for roof OS-53775, dated 18 March 2025. 2 pages, complete.", "Meter reading photo for roof OS-53775, dated 28 February 2026. Single page.", "Scaffolding agreement for roof OS-53775, dated 1 February 2026. 2 pages, complete. Signed by the property owner.", "Insurance notification letter for roof OS-53775, dated 29 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Look at each checklist line that applies to this case. A required document will only count if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Where a line is conditional, it applies only when its circumstance holds for the case. Give the answer complete: every applicable line is met (extra documents do not matter). Give the answer incomplete: at least one applicable line is not met. Give the answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-17", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 699}} {"id": "isc-te-00239-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Pentlund Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "29 May 2026"}, "checklist": ["If the borrower is self-employed, also: two most recent tax year overviews (issued within the last 18 months, signed)", "P60 tax summary (issued within the last 15 months)", "gifted deposit letter (issued within the last 3 months, signed)", "three months of bank statements (issued within the last 3 months)", "mortgage application form (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Edward Gillnall", "reference": "JK-76860", "details": ["The borrower is self-employed."]}, "documents received": ["P60 tax summary for Edward Gillnall. Date of issue: 5 August 2025. 2 pages, complete.", "Two most recent tax year overviews for Edward Gillnall. Date of issue: 30 September 2025. 4 pages, complete, signed by the borrower.", "Three months of bank statements for Edward Gillnall. Date of issue: 15 April 2026. 9 pages, complete.", "Proof of deposit savings for Edward Gillnall. Date of issue: 13 April 2026. 2 pages, complete.", "Gifted deposit letter for Edward Gillnall. Date of issue: 7 April 2026. Single page, signed by the donor.", "Mortgage application form for Edward Gillnall. Date of issue: 8 April 2026. 10 pages, complete, signed by the borrower."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 563}} {"id": "isc-te-00066-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Vorndale BV", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "31 July 2026"}, "checklist": ["Confirm the pack includes a medical examination certificate issued within the last 6 months and signed.", "Confirm the pack includes a signed driver declaration of convictions.", "Confirm the pack includes a passport style photograph issued within the last 6 months.", "Confirm the pack includes a photo driving licence that is valid (not expired) on the date of the review.", "Confirm the pack includes a criminal record check issued within the last 3 months.", "Confirm the pack includes a signed licence application form."], "submission": {"case": {"name": "Freya Brodton", "reference": "WI-95367"}, "cover note": "Please find attached everything needed for this file, all complete.", "documents received": ["WI-95367_Brodton_licence_application_form.pdf - Licence application form for Freya Brodton, dated 13 May 2026. 6 pages, complete. Signed by the applicant.", "WI-95367_Brodton_driver_declaration_of_convictions.pdf - Driver declaration of convictions for Freya Brodton, dated 12 May 2026. 1 page. Signed by Freya Brodton.", "WI-95367_Brodton_medical_examination_certificate.pdf - Medical examination certificate for Freya Brodton, dated 6 July 2026. 2 pages, complete. Signed by the examining doctor.", "WI-95367_Tadingham_criminal_record_check.pdf - Criminal record check for Ava Tadingham, dated 20 June 2026. 6 pages, complete.", "WI-95367_Brodton_photo_driving_licence.pdf - Photo driving licence for Freya Brodton, expiring 29 September 2028. 2 pages, complete.", "WI-95367_Brodton_passport_style_photograph.pdf - Passport style photograph of Freya Brodton, dated 21 July 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 849}} {"id": "isc-te-00473-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Uldberg Partners", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "21 May 2026"}, "checklist": ["Planned completion date sheet, signed.", "Access authorisation slip, signed.", "If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Parts order confirmation, issued within the last 1 months.", "Photographs of the fault, issued within the last 3 months.", "Job request form, signed."], "submission": {"case": {"name": "maintenance request NO-34425", "reference": "UR-51642", "details": ["The job involves working at height above two metres."]}, "documents received": ["Risk assessment for the task under maintenance request NO-34425. Dated 19 March 2026. 5 pages, complete. Signed by the assessing duty manager.", "Permit to work at height for maintenance request NO-34425. Dated 1 May 2026. 1 page. Signed by the issuing supervisor.", "Parts order confirmation for maintenance request NO-34425. Dated 5 May 2026. 1 page.", "Document ref 004417. The scan is blank, so its contents cannot be seen.", "Job request form for maintenance request NO-34425. Dated 3 February 2026. 1 page. Signed by the requesting tenant's site contact.", "Access authorisation slip for maintenance request NO-34425. Dated 9 May 2026. 1 page. Signed by the site access coordinator.", "Photographs of the fault for maintenance request NO-34425. Dated 24 March 2026. 2 pages, complete.", "Planned completion date sheet for maintenance request NO-34425. Dated 21 February 2026. 1 page. Signed by the facilities manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 837}} {"id": "isc-te-00354-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Urvwood Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "1 May 2026"}, "checklist": ["If the design changes how customer data is stored, also include: data protection review sign-off (signed)", "Include: proposed architecture diagram", "Include: security threat model (issued within the last 6 months)", "Include: capacity and load estimate (issued within the last 6 months)", "Include: review board feedback summary (issued within the last 3 months, signed)", "Include: problem statement page", "Include: migration and rollout plan"], "submission": {"case": {"name": "design document DI-65969", "reference": "WL-84298", "details": ["The design changes how customer data is stored."]}, "documents received": ["A data protection review sign-off for design document DI-65969, dated 9 February 2026. 2 pages, complete. Signed by the data protection officer.", "A review board feedback summary for design document DI-65969, dated 1 March 2026. 2 pages, complete. Signed by the review board chair.", "A security threat model for design document DI-65969, dated 18 January 2026. 4 pages, complete.", "A proposed architecture diagram for design document DI-65969, dated 8 April 2026. Single page.", "A problem statement page for design document DI-65969, dated 13 March 2026. 2 pages, complete.", "A capacity and load estimate for design document DI-65969, dated 18 February 2026. 3 pages, complete.", "A cost estimate sheet for design document DI-65969, dated 11 April 2026. 2 pages, complete.", "An alternatives considered table for design document DI-65969, dated 18 April 2026. 2 pages, complete.", "A migration and rollout plan for design document DI-65969, dated 20 February 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00285-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Glenvik Group", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "17 March 2026"}, "checklist": ["Check that the tax registration letter is included.", "Check that the bank account verification letter is included, that it was issued within the last 3 months, and that it is signed.", "Check that the authorised representative ID copy is included and that it is valid, meaning not expired, on the date of the review.", "Check that the product catalogue declaration is included and that it is signed.", "Check that the proof of trading address is included and that it was issued within the last 3 months.", "Check that the business registration certificate is included."], "submission": {"case": {"name": "Bolthurst Ltd", "reference": "KL-47468"}, "documents received": ["Product catalogue declaration for Bolthurst Ltd, dated 30 November 2025. 4 pages, complete. Signed by the authorised representative.", "Tax registration letter for Bolthurst Ltd, dated 7 March 2026. Single page.", "Bank account verification letter for Bolthurst Ltd, dated 5 January 2026. Signed by a bank officer. Single page.", "Business registration certificate for Bolthurst Ltd, dated 12 December 2025. Single page.", "Authorised representative ID copy for Bolthurst Ltd, showing an expiry date of 20 December 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 701}} {"id": "isc-te-00268-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zaldby BV", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "8 June 2026"}, "checklist": ["If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review.", "Travel insurance quote, issued within the last 1 months.", "Passport details form, signed.", "Hotel availability printout, issued within the last 1 months, signed.", "Booking request form, signed.", "Customer deposit receipt, issued within the last 3 months.", "Special requests note, signed."], "submission": {"case": {"name": "holiday booking TG-76662", "reference": "VD-54906", "details": ["The booking includes a child traveller."]}, "documents received": ["Child passport copy for holiday booking TG-76662. Expiry date shown: 30 September 2026. 1 page.", "Travel insurance quote for holiday booking TG-76662. Date of issue: 20 May 2026. Pages 1-1 of 2.", "Flight availability printout for holiday booking TG-76662. Date of issue: 27 May 2026. 2 pages, complete.", "Passport details form for holiday booking TG-76662. Date of issue: 3 March 2026. 1 page. Signed by the lead traveller.", "Customer deposit receipt for holiday booking TG-76662. Date of issue: 30 April 2026. 1 page.", "Hotel availability printout for holiday booking TG-76662. Date of issue: 28 May 2026. 2 pages, complete. Signed by the hotel reservations manager.", "Booking request form for holiday booking TG-76662. Date of issue: 15 March 2026. 2 pages, complete. Signed by the reservations agent.", "Special requests note for holiday booking TG-76662. Date of issue: 21 May 2026. 1 page. Signed by the reservations agent."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 861}} {"id": "isc-te-00103-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Pravness plc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "12 March 2026"}, "checklist": ["If the company operates in a cash-intensive trade, also: cash handling policy (signed)", "company tax registration certificate", "authorised signer identity document (valid (not expired) on the date of the review)", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents", "company statutes (signed)", "certificate of incorporation", "beneficial owner identification form (signed)", "shareholder register extract (issued within the last 3 months)"], "submission": {"case": {"name": "Maldwald LLP", "reference": "NL-50519", "details": ["The company does not operate in a cash-intensive trade.", "All beneficial owners of the company are residents."]}, "documents received": ["Company tax registration certificate for Maldwald LLP, dated 18 December 2025. Single page.", "Beneficial owner identification form for Maldwald LLP, dated 11 February 2026. 3 pages, complete. Signed by a beneficial owner.", "Certificate of incorporation for Maldwald LLP, dated 13 January 2026. Single page.", "Authorised signer identity document for Maldwald LLP, showing an expiry date of 9 January 2027. Single page.", "Company statutes for Maldwald LLP, dated 24 January 2026. 12 pages, complete. The signature line is empty, so the document is not signed.", "Shareholder register extract for Maldwald LLP, dated 5 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "not signed", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 746}} {"id": "isc-te-00430-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Quelston Ltd", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "13 March 2026"}, "checklist": ["If the researcher will work outside standard opening hours, also: out-of-hours access authorisation (signed)", "insurance declaration for facility work (issued within the last 12 months, signed)", "photo identity document (valid (not expired) on the date of the review)", "radiation safety training certificate (issued within the last 24 months, signed)", "home institution endorsement letter (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Faisal Ebbopoulos", "reference": "VC-78895", "details": ["The researcher will work only during standard opening hours."]}, "documents received": ["Radiation safety training certificate, in the name of Faisal Ebbopoulos, dated 3 September 2024. 1 page, signed by the radiation safety officer.", "Insurance declaration for facility work, in the name of Faisal Ebbopoulos, dated 1 July 2025. 1 page, signed by the visiting researcher.", "Photo identity document for Faisal Ebbopoulos, showing an expiry date of 11 July 2027. 1 page.", "Host scientist invitation letter, in the name of Faisal Ebbopoulos, dated 19 November 2025. 1 page, signed by the host scientist.", "Experiment safety clearance form, in the name of Faisal Ebbopoulos, dated 1 February 2026. 3 pages, complete, signed by the host scientist.", "Home institution endorsement letter, in the name of Faisal Ebbopoulos, dated 27 December 2025. 1 page, signed by the head of department."]}}, "question": {"type": "choice", "instructions": "Your task is to judge the pack against the checklist. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Say complete if every applicable line is met (extra documents do not matter). Say incomplete if at least one applicable line is not met. Say unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-24", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00307-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Baxwood Group", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "27 May 2026"}, "checklist": ["Confirm the keys handover receipt is present and signed.", "Confirm the signed draft lease is present and signed.", "Confirm the title information document is present.", "Confirm the energy performance certificate is present and valid (not expired) on 27 May 2026.", "If the tenant is a newly formed company, also confirm the signed parent company guarantee is present and signed.", "Confirm the asbestos survey report is present and was issued within the last 12 months.", "Confirm the stamp duty return is present and signed."], "submission": {"case": {"name": "premises BY-30837", "reference": "LN-29332", "details": ["The tenant is a newly formed company."]}, "documents received": ["guarantor-consent-letter-BY-30837.pdf — Guarantor consent letter for premises BY-30837, issued 20 May 2026. 1 page. Signed by the guarantor.", "asbestos-survey-report-BY-30837.pdf — Asbestos survey report for premises BY-30837, issued 26 April 2026. 4 pages, complete.", "keys-handover-receipt-BY-30837.pdf — Keys handover receipt for premises BY-30837, issued 3 April 2026. 1 page. Signed by the landlord's managing agent.", "parent-company-guarantee-BY-30837-signed.pdf — Signed parent company guarantee for premises BY-30837, dated 20 March 2026. 3 pages, complete. Signed by the parent company's authorised signatory.", "energy-performance-certificate-BY-30837-a.pdf — Energy performance certificate for premises BY-30837, expiring 6 June 2026. 1 page.", "title-information-document-BY-30837.pdf — Title information document for premises BY-30837, issued 6 February 2026. 3 pages, complete.", "draft-lease-BY-30837-signed.pdf — Signed draft lease for premises BY-30837, dated 29 April 2026. 12 pages, complete. Signed by the tenant.", "stamp-duty-return-BY-30837.pdf — Stamp duty return for premises BY-30837, issued 8 March 2026. 2 pages, complete. Signed by the tenant's accountant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 981}} {"id": "isc-te-00258-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Orrgard Limited", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "20 April 2026"}, "checklist": ["Data protection impact assessment, issued within the last 12 months and signed.", "Merchant account agreement, signed.", "Test environment transaction log, issued within the last 1 months.", "Penetration test summary, issued within the last 6 months and signed.", "Go-live sign-off certificate, issued within the last 1 months and signed.", "Fraud screening configuration sheet, signed."], "submission": {"case": {"name": "payment gateway KK-52797", "reference": "ZJ-99275"}, "documents received": ["Fraud screening configuration sheet for payment gateway KK-52797, dated 4 January 2026. Single page. Signed by the Fraud Prevention Lead.", "Merchant account agreement for payment gateway KK-52797, dated 28 December 2025. 6 pages, complete. Signed by the Payments Director.", "Test environment transaction log for payment gateway KK-52797, dated 12 April 2026. Pages 1-2 of 4 are included.", "Data protection impact assessment for payment gateway KK-52797, dated 6 January 2026. 5 pages, complete. Signed by the Data Protection Officer.", "Go-live sign-off certificate for payment gateway KK-52797, dated 12 April 2026. Single page. Signed by the Head of Payments.", "Gateway integration request form for payment gateway KK-52797, dated 6 March 2026. 2 pages, complete. Signed by the requesting manager.", "Penetration test summary for payment gateway KK-52797, dated 17 November 2025. 3 pages, complete. Signed by the penetration tester."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide. Go through each checklist line that applies to this case. Only count a required document if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-64", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00257-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Pentmont Inc", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "16 September 2026"}, "checklist": ["Policy breach summary, issued within the last 3 months, signed.", "Complaint escalation form, issued within the last 1 months, signed.", "Complaint category code sheet.", "Original complaint record, issued within the last 6 months."], "submission": {"case": {"name": "escalated complaint XT-33373", "reference": "KA-91939"}, "documents received": ["Policy breach summary for escalated complaint XT-33373, dated 26 August 2026. 2 pages, complete. Signed by the Customer Relations Manager.", "Complaint category code sheet for escalated complaint XT-33373, dated 27 July 2026. Single page.", "Complaint escalation form for escalated complaint XT-33373; the date of issue is smudged and cannot be read. 2 pages, complete. Signed by the Customer Relations Manager.", "Proposed resolution letter draft for escalated complaint XT-33373, dated 21 May 2026. 2 pages, complete. Signed by the Customer Relations Manager.", "Original complaint record for escalated complaint XT-33373, dated 8 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "expired", "defect": "date not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 699}} {"id": "isc-te-00377-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Vornburg & Co", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "24 April 2026"}, "checklist": ["If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "venue access instructions (issued within the last 3 months)", "If the delegate requires an adjusted learning plan, also: learning support agreement (signed)", "payment confirmation (issued within the last 3 months)", "delegate photo identification (valid (not expired) on the date of the review)", "special requirements note", "cancellation policy acceptance (signed)"], "submission": {"case": {"name": "course booking UL-99308", "reference": "DD-21847", "details": ["The course leads to a licensed qualification.", "The delegate requires no adjusted learning plan."]}, "cover note": "Please accept my apologies for the state of this pack, as it had to be put together in a rush.", "documents received": ["Licence eligibility declaration for course booking UL-99308, issued on 4 April 2026. Single page. Signed by the delegate.", "Delegate photo identification for course booking UL-99308. It shows an expiry date of 19 December 2027. Single page.", "Special requirements note for course booking UL-99308, issued on 21 January 2026. Single page.", "Payment confirmation for course booking UL-99308, issued on 20 April 2026. Single page.", "Cancellation policy acceptance for course booking UL-99308, issued on 25 February 2026. Single page. Signed by the delegate.", "Venue access instructions for course booking UL-99308, issued on 7 February 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00163-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Fervbrook Limited", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "13 August 2026"}, "checklist": ["Doctoral researcher progress summary, issued within the last 6 months and signed.", "Financial expenditure summary, issued within the last 3 months and signed.", "If the institute hosts research involving human participants, also: ethics committee annual return, issued within the last 12 months and signed.", "Intellectual property register extract, issued within the last 6 months and signed.", "External advisory board minutes, issued within the last 12 months and signed.", "Annual activity report, issued within the last 6 months and signed.", "Staffing plan, issued within the last 6 months and signed."], "submission": {"case": {"name": "Arvmont Inc", "reference": "QZ-81186", "details": ["The institute hosts research involving human participants."]}, "documents received": ["Intellectual property register extract for Arvmont Inc, dated 10 April 2026; 1 page. Signed by the register keeper.", "Financial expenditure summary for Arvmont Inc, dated 29 May 2026; 3 pages, complete. Signed by the institute finance officer.", "Staffing plan for Arvmont Inc, dated 27 February 2026; 2 pages, complete. Signed by the institute director.", "Doctoral researcher progress summary for Arvmont Inc, dated 30 July 2026; 2 pages, complete. Signed by the supervising professor.", "Ethics committee annual return for Arvmont Inc, dated 21 May 2026; 2 pages, complete. Signed by the ethics committee chair.", "External advisory board minutes for Arvmont Inc, dated 3 February 2026; 4 pages, complete. Signed by the board secretary.", "Annual activity report for Arvmont Inc, dated 7 May 2026; pages 1-6 are included and the total number of pages is not shown anywhere. Signed by the institute director.", "Publications list for Arvmont Inc, dated 8 October 2025; 4 pages, complete.", "Director's declaration of interests for Arvmont Inc, dated 21 October 2025; 1 page. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 906}} {"id": "isc-te-00265-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Ilvvale LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "6 April 2026"}, "checklist": ["Booking voucher, issued within the last 6 months", "Vehicle condition report, signed", "Passport, valid (not expired) on 6 April 2026, signed", "Additional driver authorisation form, signed", "Credit card in the driver's name, valid (not expired) on 6 April 2026, signed", "Driving licence, valid (not expired) on 6 April 2026, signed", "If the booking includes crossing a land border, also: cross-border travel permission, signed"], "submission": {"case": {"name": "Lucy Bixisey", "reference": "OV-98787", "details": ["The booking stays within one country."]}, "documents received": ["driving_licence_ov98787.pdf — Driving licence for Lucy Bixisey. It shows its expiry date as 9 October 2026. It is 2 pages, complete. It is signed by the licence holder.", "fuel_policy_sheet_ov98787.pdf — Fuel policy sheet for Lucy Bixisey. It shows its date of issue as 20 February 2026. It is a single page. It is signed by the branch counter staff member.", "insurance_excess_waiver_certificate_ov98787.pdf — Insurance excess waiver certificate for Lucy Bixisey. It shows its expiry date as 6 July 2028. It is 2 pages, complete.", "vehicle_condition_report_ov98787.pdf — Vehicle condition report for Lucy Bixisey. It shows its date of issue as 3 March 2026. It is 2 pages, complete. It is signed by the inspecting staff member.", "booking_voucher_ov98787.pdf — Booking voucher for Lucy Bixisey. It shows its date of issue as 20 December 2025. It is a single page.", "credit_card_ov98787.pdf — Credit card in the driver's name for Lucy Bixisey. It shows its expiry date as 18 November 2026. It is a single page. It is signed by the cardholder.", "passport_ov98787.pdf — Passport for Lucy Bixisey. It shows its expiry date as 15 December 2027. It is a single page. It is signed by the passport holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 939}} {"id": "isc-te-00258-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Orrgard Limited", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "20 April 2026"}, "checklist": ["Data protection impact assessment, issued within the last 12 months and signed.", "Merchant account agreement, signed.", "Test environment transaction log, issued within the last 1 months.", "Penetration test summary, issued within the last 6 months and signed.", "Go-live sign-off certificate, issued within the last 1 months and signed.", "Fraud screening configuration sheet, signed."], "submission": {"case": {"name": "payment gateway KK-52797", "reference": "ZJ-99275"}, "documents received": ["Penetration test summary for payment gateway KK-52797, dated 17 November 2025. 3 pages, complete. Signed by the penetration tester.", "Fraud screening configuration sheet for payment gateway KK-52797, dated 4 January 2026. Single page. Signed by the Fraud Prevention Lead.", "Data protection impact assessment for payment gateway KK-52797, dated 6 January 2026. 5 pages, complete. Signed by the Data Protection Officer.", "Test environment transaction log for payment gateway KK-52797, dated 12 April 2026. 4 pages, complete.", "Go-live sign-off certificate for payment gateway KK-52797, dated 12 April 2026. Single page. Signed by the Head of Payments.", "Merchant account agreement for payment gateway KK-52797, dated 28 December 2025. 6 pages, complete. Signed by the Payments Director.", "Payment gateway technical specification for payment gateway KK-52797, dated 1 January 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 799}} {"id": "isc-te-00301-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Marlcliff Limited", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "3 March 2026"}, "checklist": ["Liability claim form, signed.", "Incident report from the day, issued within the last 3 months, signed.", "Photographs of the spillage on the floor, issued within the last 1 months.", "CCTV footage stills of the incident, issued within the last 3 months.", "Public liability insurance schedule.", "Cleaning log for the day of the incident, issued within the last 6 months, signed."], "submission": {"case": {"name": "Jundton Ltd", "reference": "EC-53915"}, "documents received": ["CCTV footage stills of the incident relating to Jundton Ltd, dated 24 February 2026. 2 pages, complete.", "Public liability insurance schedule relating to Jundton Ltd, dated 22 February 2026. 4 pages, complete.", "Liability claim form relating to Jundton Ltd, dated 30 January 2026. 3 pages, complete. Signed by the claimant.", "Cleaning log for the day of the incident relating to Jundton Ltd, dated 2 October 2025. Single page. Signed by the cleaner.", "Incident report from the day, but relating to Fravridge & Co, dated 1 February 2026. 2 pages, complete. Signed by the store manager.", "Photographs of the spillage on the floor relating to Jundton Ltd, dated 25 February 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 745}} {"id": "isc-te-00283-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Weskwood GmbH", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "29 May 2026"}, "checklist": ["Proof of deposit issued within the last 3 months", "Employment certificate issued within the last 1 month and signed", "Property valuation report issued within the last 6 months and signed", "Photo identity document valid (not expired) on the date of the review", "Bank statement issued within the last 3 months", "Mortgage application form, signed"], "submission": {"case": {"name": "property XP-89411", "reference": "BB-98566"}, "documents received": ["sale_and_purchase_agreement_XP-89411.pdf. A sale and purchase agreement for property XP-89411, dated 8 March 2026. It has 9 pages, complete, and is signed by the buyer and the seller.", "proof_of_deposit_XP-89411.pdf. A proof of deposit for property XP-89411, dated 10 April 2026. It is a single page.", "photo_identity_document_XP-89411.pdf. A photo identity document for property XP-89411 showing an expiry date of 14 November 2027. It is a single page.", "property_valuation_report_XP-89411.pdf. A property valuation report for property XP-89411, dated 19 March 2026. It has 10 pages, complete, and is signed by the valuer.", "mortgage_application_form_XP-89411.pdf. A mortgage application form for property XP-89411, dated 31 March 2026. It has 6 pages, complete, and is signed by the applicant.", "employment_certificate_XP-89411_v3.pdf. An employment certificate for property XP-89411, dated 27 May 2026. It is a single page and is signed by the employer.", "bank_statement_XP-89411.pdf. A bank statement for property XP-89411, dated 30 March 2026. It has 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 887}} {"id": "isc-te-00286-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Zaldwyn LLP", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "18 May 2026"}, "checklist": ["Terms of sale acceptance log, issued within the last 12 months", "Chargeback response form, signed", "Signature proof of delivery, issued within the last 6 months and signed", "If the goods were delivered to an address different from the billing address, also: address verification check report, issued within the last 3 months", "Transaction record printout, issued within the last 3 months", "Delivery confirmation, issued within the last 6 months", "Fraud screening result sheet, issued within the last 3 months"], "submission": {"case": {"name": "disputed transaction MN-64545", "reference": "FE-41761", "details": ["The goods were delivered to an address different from the billing address."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["Photograph of an unattended parcel on a doorstep relating to disputed transaction MN-64545, dated 24 December 2025. 1 page. Signed by the delivery driver.", "Address verification check report relating to disputed transaction MN-64545, dated 10 May 2026. 1 page.", "Terms of sale acceptance log relating to disputed transaction MN-64545, dated 26 December 2025. 1 page.", "Transaction record printout relating to disputed transaction MN-64545, dated 2 March 2026. 1 page.", "Chargeback response form relating to disputed transaction MN-64545, dated 18 April 2026. 2 pages, complete. Signed by the disputes team lead.", "Delivery confirmation relating to disputed transaction MN-64545, dated 24 February 2026. 1 page.", "Signature proof of delivery relating to disputed transaction MN-64545, dated 24 December 2025. 1 page. Signed by the delivery driver.", "Fraud screening result sheet relating to disputed transaction MN-64545, dated 8 April 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 880}} {"id": "isc-te-00445-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vaskburg Partners", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "27 August 2026"}, "checklist": ["If the claim exceeds the limit that requires director sign-off, also: director approval slip (issued within the last 3 months, signed)", "taxi fare receipt (issued within the last 6 months)", "restaurant receipt (issued within the last 6 months)", "train ticket receipt", "conference fee invoice (issued within the last 12 months)", "hotel invoice (issued within the last 6 months)"], "submission": {"case": {"name": "Claire Daskard", "reference": "YL-14076", "details": ["The claim exceeds the limit that requires director sign-off."]}, "documents received": ["Director approval slip. It concerns Claire Daskard and shows its date of issue as 1 July 2026. It is 1 page and carries the signature of the finance director.", "Hotel invoice. It concerns Claire Daskard and shows its date of issue as 31 March 2026. It is 2 pages, complete.", "Conference fee invoice. It concerns Claire Daskard and shows its date of issue as 4 March 2026. It is 1 page.", "Train ticket receipt. It concerns Claire Daskard and shows its date of issue as 7 July 2026. It is 1 page.", "Restaurant receipt. It concerns Claire Daskard and shows its date of issue as 19 July 2026. It is 1 page.", "Taxi fare receipt. It concerns Claire Daskard and shows its date of issue as 25 July 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 758}} {"id": "isc-te-00298-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Holham Limited", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "9 June 2026"}, "checklist": ["Check that the pack contains the written grievance statement, signed.", "Check that the pack contains the witness list, signed.", "Check that the pack contains the meeting invitation with rights explained, issued within the last 1 months.", "Check that the pack contains the previous grievance outcome letter, issued within the last 24 months.", "Check that the pack contains the grievance procedure acknowledgement, issued within the last 3 months and signed."], "submission": {"case": {"name": "Amelia Ostford", "reference": "BI-54578"}, "documents received": ["Witness list about Amelia Ostford, dated 16 April 2026. Single page. The bottom of the page is cropped, so the signature block cannot be seen and it is not known whether the document is signed.", "Grievance procedure acknowledgement about Amelia Ostford, dated 6 June 2026. Single page. Signed by Amelia Ostford.", "Investigator appointment letter about Amelia Ostford, dated 23 May 2026. Single page.", "Adjustment request record about Amelia Ostford, dated 8 May 2026. Single page. Signed by the case administrator.", "Meeting invitation with rights explained, about Amelia Ostford, dated 26 May 2026. Single page.", "Written grievance statement about Amelia Ostford, dated 7 April 2026. 3 pages, complete. Signed by Amelia Ostford.", "Previous grievance outcome letter about Amelia Ostford, dated 27 March 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 757}} {"id": "isc-te-00022-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Orrham & Co", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "26 March 2026"}, "checklist": ["Cost estimate, issued within the last 3 months and signed.", "Planned completion date sheet, signed.", "Parts order confirmation, issued within the last 1 months.", "Photographs of the fault, issued within the last 3 months.", "If the job involves working at height above two metres, also: permit to work at height, issued within the last 1 months and signed.", "Risk assessment for the task, issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request GA-62900", "reference": "IH-29832", "details": ["The job involves no work at height above two metres."]}, "documents received": ["location-details-sheet-GA-62900.pdf - Location details sheet for maintenance request GA-62900, issued 26 January 2026. Single page.", "risk-assessment-for-the-task-GA-62900.pdf - Risk assessment for the task for maintenance request GA-62900, issued 18 March 2026. 5 pages, complete. Signed by the assessor.", "cost-estimate-GA-62900-v2.pdf - Cost estimate for maintenance request GA-62900, issued 31 December 2025. 2 pages, complete. Signed by the estimator.", "scan-0009.pdf - The file will not open, so its contents cannot be seen.", "planned-completion-date-sheet-GA-62900.pdf - Planned completion date sheet for maintenance request GA-62900, issued 12 February 2026. Single page. Signed by the job planner.", "photographs-of-the-fault-GA-62900.pdf - Photographs of the fault for maintenance request GA-62900, issued 2 February 2026. 2 pages, complete.", "parts-order-confirmation-GA-62900.pdf - Parts order confirmation for maintenance request GA-62900, issued 9 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 883}} {"id": "isc-te-00335-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Dravwater Ltd", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "13 May 2026"}, "checklist": ["Check for proof of national insurance number.", "Check for proof of earnings, issued within the last 1 months.", "Check for proof of identity, valid (not expired) on the date of the review.", "Check for rent book or rent payment schedule, issued within the last 2 months.", "Check for proof of savings, issued within the last 2 months.", "Check for current tenancy agreement, signed."], "submission": {"case": {"name": "Daniel Nebbford", "reference": "YX-55936"}, "documents received": ["Proof of identity for Daniel Nebbford. Expiry date: 29 October 2026. 1 page.", "Benefit claim form for Daniel Nebbford. Expiry date: 19 July 2027. 12 pages, complete. Signed by the claimant.", "Proof of national insurance number for Daniel Nebbford. Date of issue: 18 April 2026. 1 page.", "Rent book or rent payment schedule for Daniel Nebbford. Date of issue: 3 May 2026. 4 pages, complete.", "Current tenancy agreement for Daniel Nebbford. Date of issue: 30 January 2026. 12 pages, complete. Signed by the landlord.", "Proof of earnings for Daniel Nebbford. Date of issue: 6 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 727}} {"id": "isc-te-00120-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Morvholm Group", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "3 March 2026"}, "checklist": ["Obtain the equipment breakdown claim form, signed.", "Obtain the photographs of the failed component.", "Obtain the machine maintenance log, issued within the last 6 months.", "Obtain the repair or replacement quotation, issued within the last 3 months.", "Obtain the purchase invoice for the machine.", "Obtain the production downtime log, issued within the last 3 months and signed."], "submission": {"case": {"name": "failed machine WJ-98667", "reference": "SK-93016"}, "cover note": "Please accept my apologies that this pack was put together in a rush. Michael Daskden", "documents received": ["purchase_invoice_machine_WJ-98667.pdf — Purchase invoice for the machine, covering failed machine WJ-98667, dated 11 November 2025. It is a single page.", "machine_maintenance_log_WJ-98667.pdf — Machine maintenance log for failed machine WJ-98667, dated 8 December 2025. 5 pages, complete.", "photographs_failed_component_WJ-98667.pdf — Photographs of the failed component for failed machine WJ-98667, dated 5 November 2025. 2 pages, complete.", "engineer_fault_diagnosis_report_WJ-98667.pdf — Engineer's fault diagnosis report for failed machine WJ-98667, dated 19 February 2026. It is signed by the diagnostic engineer. 4 pages, complete.", "repair_replacement_quotation_WJ-98667.pdf — Repair or replacement quotation for failed machine WJ-98667, dated 17 December 2025. 2 pages, complete.", "production_downtime_log_WJ-98667.pdf — Production downtime log for failed machine WJ-98667, dated 8 January 2026. It is signed by the production manager. 2 pages, complete.", "equipment_breakdown_claim_form_WJ-98667.pdf — Equipment breakdown claim form for failed machine WJ-98667, dated 4 November 2025. It is signed by the policyholder's claims representative. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Look at each checklist line that applies to this case. A required document will only count if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Where a line is conditional, it applies only when its circumstance holds for the case. Give the answer complete: every applicable line is met (extra documents do not matter). Give the answer incomplete: at least one applicable line is not met. Give the answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-17", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 943}} {"id": "isc-te-00240-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jarlvik Group", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "8 September 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Travel request form (signed)", "Trip cost estimate (signed)", "Passport copy for international travel (valid (not expired) on the date of the review)", "Hotel booking confirmation", "Line manager approval (signed)", "Visa entry requirement printout (issued within the last 3 months)"], "submission": {"case": {"name": "business trip TW-11432", "reference": "GJ-59230", "details": ["The traveller is not a passport holder of the destination country."]}, "documents received": ["Line manager approval. It concerns business trip TW-11432. Date of issue: 18 June 2026. Single page. Signed by the line manager.", "Work permit confirmation. It concerns business trip TW-11432. Date of issue: 9 June 2026. 2 pages, complete.", "Passport copy for international travel. It concerns business trip TW-11432. Expiry date: 21 January 2027. Single page.", "Hotel booking confirmation. It concerns business trip TW-11432. Date of issue: 11 August 2026. 2 pages, complete.", "Trip cost estimate. It concerns business trip TW-11432. Date of issue: 5 August 2026. Single page. Signed by the traveller.", "Visa entry requirement printout. It concerns business trip TW-11432. Date of issue: 10 July 2026. 2 pages, complete.", "Travel request form. It concerns business trip TW-11432. Date of issue: 16 August 2026. 2 pages, complete. Signed by the traveller.", "Flight itinerary quote. It concerns business trip TW-11432. Date of issue: 26 August 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 859}} {"id": "isc-te-00173-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Belmhall Ltd", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "20 August 2026"}, "checklist": ["Check that the pack contains an incident timeline issued no more than 3 months ago.", "Check that the pack contains postmortem meeting minutes issued no more than 3 months ago and signed.", "Check that the pack contains a root cause analysis report issued no more than 3 months ago and signed.", "Check that the pack contains an alerting rules review note issued no more than 3 months ago."], "submission": {"case": {"name": "production incident FN-18440", "reference": "PK-62381"}, "cover note": "Sorry that this pack was put together in a bit of a rush. Please review it and let me know if anything needs a second look.", "documents received": ["Incident timeline for production incident FN-18440, date of issue 13 August 2026. 3 pages, complete.", "Alerting rules review note for production incident FN-18440, date of issue 14 July 2026. 2 pages, complete.", "Root cause analysis report for production incident FN-18440, date of issue 29 June 2026. 5 pages, complete. Signed by the lead reliability engineer.", "Postmortem meeting minutes for production incident FN-18440, date of issue 10 August 2026. 3 pages, complete. Signed by the meeting chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 725}} {"id": "isc-te-00163-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Fervbrook Limited", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "13 August 2026"}, "checklist": ["Doctoral researcher progress summary, issued within the last 6 months and signed.", "Financial expenditure summary, issued within the last 3 months and signed.", "If the institute hosts research involving human participants, also: ethics committee annual return, issued within the last 12 months and signed.", "Intellectual property register extract, issued within the last 6 months and signed.", "External advisory board minutes, issued within the last 12 months and signed.", "Annual activity report, issued within the last 6 months and signed.", "Staffing plan, issued within the last 6 months and signed."], "submission": {"case": {"name": "Arvmont Inc", "reference": "QZ-81186", "details": ["The institute hosts research involving human participants."]}, "documents received": ["Ethics committee annual return for Arvmont Inc, dated 21 May 2026; 2 pages, complete. Signed by the ethics committee chair.", "Doctoral researcher progress summary for Arvmont Inc, dated 30 July 2026; 2 pages, complete. Signed by the supervising professor.", "Intellectual property register extract for Arvmont Inc, dated 10 April 2026; 1 page. Signed by the register keeper.", "Staffing plan for Arvmont Inc, dated 27 February 2026; 2 pages, complete. Signed by the institute director.", "Annual activity report for Arvmont Inc, dated 7 May 2026; 12 pages, complete. Signed by the institute director.", "Financial expenditure summary for Arvmont Inc, dated 29 May 2026; 3 pages, complete. Signed by the institute finance officer.", "External advisory board minutes for Arvmont Inc, dated 3 February 2026; 4 pages, complete. Signed by the board secretary."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Review every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-71", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 834}} {"id": "isc-te-00354-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Urvwood Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "1 May 2026"}, "checklist": ["If the design changes how customer data is stored, also include: data protection review sign-off (signed)", "Include: proposed architecture diagram", "Include: security threat model (issued within the last 6 months)", "Include: capacity and load estimate (issued within the last 6 months)", "Include: review board feedback summary (issued within the last 3 months, signed)", "Include: problem statement page", "Include: migration and rollout plan"], "submission": {"case": {"name": "design document DI-65969", "reference": "WL-84298", "details": ["The design does not change how customer data is stored."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["A capacity and load estimate for design document DI-65969, dated 18 February 2026. 3 pages, complete.", "A migration and rollout plan for design document DI-65969, dated 20 February 2026. 3 pages, complete.", "A review board feedback summary for design document DI-65969, dated 1 March 2026. 2 pages, complete. Signed by the review board chair.", "A problem statement page for design document DI-65969, dated 13 March 2026. 2 pages, complete.", "A security threat model for design document DI-65969, dated 18 January 2026. 4 pages, complete.", "A proposed architecture diagram for design document DI-65969, dated 8 April 2026. Single page.", "An alternatives considered table for design document DI-65969, dated 18 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 814}} {"id": "isc-te-00156-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Baxridge Group", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "15 June 2026"}, "checklist": ["Right to work share code printout, issued within the last 3 months", "Medical examination certificate, issued within the last 6 months and signed", "Criminal record check, issued within the last 3 months", "Signed licence application form", "If the applicant is applying for a hackney carriage licence rather than private hire, also: vehicle specification sheet for the hackney carriage"], "submission": {"case": {"name": "Seren Bixingham", "reference": "GY-35046", "details": ["The applicant is applying for a private hire licence rather than hackney carriage."]}, "documents received": ["GY-35046 Cormez right to work share code printout. A single-page right to work share code printout about Robert Cormez, showing its date of issue as 29 March 2026.", "GY-35046 Bixingham medical examination certificate. A medical examination certificate about Seren Bixingham, showing its date of issue as 24 March 2026, 2 pages, complete. It is signed by the examining doctor.", "GY-35046 Bixingham licence application form. A licence application form about Seren Bixingham, showing its date of issue as 24 May 2026, 6 pages, complete. It is signed by the applicant, Seren Bixingham.", "GY-35046 Bixingham knowledge test pass certificate. A single-page knowledge test pass certificate about Seren Bixingham, showing its date of issue as 31 March 2026.", "GY-35046 Bixingham criminal record check. A criminal record check about Seren Bixingham, showing its date of issue as 10 June 2026, 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00149-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Xanheim GmbH", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "7 May 2026"}, "checklist": ["Pension contribution certificate, issued within the last 13 months", "Rental income record", "Employment income summary, issued within the last 13 months", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Bank interest statement, issued within the last 13 months"], "submission": {"case": {"name": "household tax affairs WG-34056", "reference": "EP-63392", "details": ["The household sold no property other than its main home during the tax year."]}, "documents received": ["Pension contribution certificate.pdf - Pension contribution certificate for household tax affairs WG-34056. Its date of issue is 21 June 2025. 2 pages, complete.", "Capital gains asset record.pdf - Capital gains asset record for household tax affairs WG-34056. Its date of issue is 8 February 2026. 2 pages, complete.", "Rental income record.pdf - Rental income record for household tax affairs WG-34056. Its date of issue is 27 January 2026. 4 pages, complete.", "Employment income summary.pdf - Employment income summary for household tax affairs WG-34056. Its date of issue is 18 August 2025. 2 pages, complete.", "Childcare payment receipt.pdf - Childcare payment receipt for household tax affairs WG-34056. Its date of issue is 13 March 2026. 1 page.", "Bank interest statement.pdf - Bank interest statement for household tax affairs WG-34056. Its date of issue is 30 April 2025. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 810}} {"id": "isc-te-00038-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Lunwyn Partners", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "8 April 2026"}, "checklist": ["Confirm the cure period expiry calculation is included, that it was issued within the last 1 months, and that it is signed.", "Confirm the termination notice draft is included and that it is signed.", "If the contract requires a dispute to go to mediation first, also: confirm the mediation request confirmation is included, that it was issued within the last 1 months, and that it is signed.", "Confirm the original service agreement copy is included.", "Confirm the breach evidence log is included, that it was issued within the last 1 months, and that it is signed."], "submission": {"case": {"name": "Tarvcombe & Co", "reference": "BI-47555", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Cure period expiry calculation for Tarvcombe & Co, dated 4 April 2026, 2 pages, complete. Signed by the contract manager.", "Termination notice draft for Tarvcombe & Co, dated 25 January 2026, 2 pages, complete. Signed by the commercial director.", "Mediation request confirmation for Tarvcombe & Co, dated 23 March 2026, single page. Signed by the mediation case officer.", "Original service agreement copy for Tarvcombe & Co, dated 24 December 2025, 10 pages, complete.", "Breach evidence log for Tarvcombe & Co, dated 23 March 2026, 6 pages, complete. Signed by the disputes case handler."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00119-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Prydcourt Ltd", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "13 August 2026"}, "checklist": ["Confirm the trial period proposal is included and signed.", "If the employee has caring responsibilities for a dependent, also check for a caring responsibilities statement and confirm it is signed.", "Confirm the client or service impact statement is included and signed.", "Confirm the impact assessment on the team is included and signed.", "Confirm the line manager opinion note is signed and was issued within the last 2 months.", "Confirm the current working pattern statement is issued within the last 3 months.", "Confirm the proposed working pattern plan is included and signed."], "submission": {"case": {"name": "Thiago Lamingham", "reference": "TJ-66574", "details": ["The employee has caring responsibilities for a dependent."]}, "cover note": "This pack was already checked by a colleague before being sent on to you. I am passing it over for your review.", "documents received": ["client or service impact statement – Thiago Lamingham, issued 27 June 2026. A single page, signed by the line manager.", "trial period proposal – Thiago Lamingham, issued 1 July 2026. A single page, signed by the line manager.", "impact assessment on the team – Thiago Lamingham, issued 9 May 2026. 3 pages, complete, signed by the line manager.", "current working pattern statement – Thiago Lamingham, issued 17 June 2026. A single page.", "line manager opinion note – Thiago Lamingham, issued 5 July 2026. 2 pages, complete, signed by the line manager.", "proposed working pattern plan – Thiago Lamingham, issued 4 July 2026. 2 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 792}} {"id": "isc-te-00152-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ilvstow GmbH", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "23 July 2026"}, "checklist": ["If the trip involves travel to a country requiring a visa, also: visa approval letter", "trip cost estimate (signed)", "If the traveller is not a passport holder of the destination country, also: work permit confirmation", "passport copy for international travel (valid (not expired) on the date of the review)", "hotel booking confirmation", "line manager approval (signed)"], "submission": {"case": {"name": "business trip JD-97425", "reference": "DE-41048", "details": ["The trip involves no country requiring a visa.", "The traveller is not a passport holder of the destination country."]}, "documents received": ["File: line manager approval JD-97425. A line manager approval for business trip JD-97425, dated 16 May 2026. It is 1 page and is signed by the line manager.", "File: trip cost estimate JD-97425. A trip cost estimate for business trip JD-97425, dated 3 June 2026. It is 1 page and carries a signature from the line manager.", "File: passport copy JD-97425.pdf. A passport copy for international travel for business trip JD-97425, showing an expiry date of 19 July 2026. It is 1 page.", "File: hotel booking confirmation JD-97425. A hotel booking confirmation for business trip JD-97425, dated 21 April 2026. 2 pages, complete.", "File: work permit confirmation JD-97425. A work permit confirmation for business trip JD-97425, dated 21 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "expired", "defect": "expired before the review", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00068-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Halvby LLP", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "6 April 2026"}, "checklist": ["Safeguarding referral form, issued within the last 12 months, signed", "Needs assessment report, signed", "Support plan, signed", "Financial assessment form, signed", "Recent bank statements, issued within the last 3 months", "Proof of identity, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Vikram Nebbberg", "reference": "VI-15919"}, "documents received": ["Needs assessment report for Vikram Nebbberg. Date of issue: 4 February 2026. 12 pages, complete. Signed by the lead assessor.", "Recent bank statements for Vikram Nebbberg. Date of issue: 15 February 2026. 8 pages, complete.", "Proof of identity for Vikram Nebbberg. Expiry date: 31 October 2027. Single page.", "Support plan for Vikram Nebbberg. Date of issue: 26 January 2026. 6 pages, complete. Signed by the care coordinator.", "Safeguarding referral form for Vikram Nebbberg. Date of issue: 22 December 2025. 2 pages, complete. The signature line is empty: the form is not signed.", "Financial assessment form for Vikram Nebbberg. Date of issue: 3 January 2026. 6 pages, complete. Signed by the financial assessment officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00301-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Marlcliff Limited", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "3 March 2026"}, "checklist": ["Liability claim form, signed.", "Incident report from the day, issued within the last 3 months, signed.", "Photographs of the spillage on the floor, issued within the last 1 months.", "CCTV footage stills of the incident, issued within the last 3 months.", "Public liability insurance schedule.", "Cleaning log for the day of the incident, issued within the last 6 months, signed."], "submission": {"case": {"name": "Jundton Ltd", "reference": "EC-53915"}, "documents received": ["Cleaning log for the day of the incident relating to Jundton Ltd, dated 2 October 2025. Single page. Signed by the cleaner.", "The shop's opening hours notice relating to Jundton Ltd, dated 1 February 2026. 2 pages, complete. Signed by the store manager.", "Incident report from the day relating to Jundton Ltd, dated 1 February 2026. 2 pages, complete. Signed by the duty manager.", "Photographs of the spillage on the floor relating to Jundton Ltd, dated 25 February 2026. Single page.", "CCTV footage stills of the incident relating to Jundton Ltd, dated 24 February 2026. 2 pages, complete.", "Public liability insurance schedule relating to Jundton Ltd, dated 22 February 2026. 4 pages, complete.", "Liability claim form relating to Jundton Ltd, dated 30 January 2026. 3 pages, complete. Signed by the claimant."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 589}} {"id": "isc-te-00016-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Jundburg Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "7 July 2026"}, "checklist": ["Payment confirmation, issued within the last 3 months.", "Prerequisite certificate.", "Venue access instructions, issued within the last 3 months.", "If the delegate requires an adjusted learning plan, also: learning support agreement, signed.", "Course booking form, signed.", "Cancellation policy acceptance, signed.", "Special requirements note."], "submission": {"case": {"name": "course booking MS-72228", "reference": "IX-67327", "details": ["The delegate requires an adjusted learning plan."]}, "documents received": ["cancellation_policy_acceptance_12Apr2026.pdf: A cancellation policy acceptance about course booking MS-72228. It shows a date of issue of 12 April 2026, is a single page and bears the signature of the delegate.", "course_booking_form_22Apr2026.pdf: A course booking form about course booking MS-72228. It shows a date of issue of 22 April 2026 and has 2 pages, complete. It bears the signature of the delegate.", "learning_support_agreement_19Mar2026.pdf: A learning support agreement about course booking MS-72228. It shows a date of issue of 19 March 2026, is a single page and bears the signature of the course administrator.", "employer_sponsorship_letter_16Jun2026.pdf: An employer sponsorship letter about course booking MS-72228. It shows a date of issue of 16 June 2026, is a single page and bears the signature of the employer's HR manager.", "payment_confirmation_17May2026.pdf: A payment confirmation about course booking MS-72228. It shows a date of issue of 17 May 2026 and is a single page.", "special_requirements_note_17Mar2026.pdf: A special requirements note about course booking MS-72228. It shows a date of issue of 17 March 2026 and is a single page.", "venue_access_instructions_1May2026.pdf: Venue access instructions about course booking MS-72228. It shows a date of issue of 1 May 2026 and is a single page.", "screenshot_basket_17May2026.pdf: A screenshot of items left in an online basket about course booking MS-72228. It shows a date of issue of 17 May 2026 and is a single page.", "prerequisite_certificate_12Jun2026.pdf: A prerequisite certificate about course booking MS-72228. It shows a date of issue of 12 June 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1032}} {"id": "isc-te-00190-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ovarcourt GmbH", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "20 March 2026"}, "checklist": ["Mortgage application form, signed", "Sale and purchase agreement, signed", "Proof of deposit issued within the last 3 months", "Photo identity document valid (not expired) on the date of the review", "Credit bureau report issued within the last 1 months", "Employment certificate issued within the last 1 months, signed"], "submission": {"case": {"name": "property YQ-74246", "reference": "EC-84723"}, "cover note": "My apologies — this pack was put together in a rush. Kind regards, Carmen Rookisey", "documents received": ["photo-identity-document-YQ-74246.pdf — Photo identity document for property YQ-74246. It shows an expiry date of 8 November 2026. It is 1 page.", "property-valuation-report-YQ-74246.pdf — Property valuation report for property YQ-74246. It shows a date of issue of 16 February 2026. It is 10 pages, complete, and is signed by the valuer.", "proof-of-deposit-YQ-74246.pdf — Proof of deposit for property YQ-74246. It shows a date of issue of 8 January 2026. It is 1 page.", "credit-bureau-report-YQ-74246.pdf — Credit bureau report for property YQ-74246. It shows a date of issue of 10 March 2026. It is 4 pages, complete.", "mortgage-application-form-YQ-74246.pdf — Mortgage application form for property YQ-74246. It shows a date of issue of 7 December 2025. It is 6 pages, complete, and is signed by the applicant.", "sale-and-purchase-agreement-YQ-74246.pdf — Sale and purchase agreement for property YQ-74246. It shows a date of issue of 6 March 2026. It is 9 pages, complete, and is signed by the buyer and the seller.", "employment-certificate-YQ-74246.pdf — Employment certificate for property YQ-74246. It shows a date of issue of 14 March 2026. It is 1 page and is signed by the employer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 949}} {"id": "isc-te-00274-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Vasklund GmbH", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "19 June 2026"}, "checklist": ["Asset register update, issued within the last 1 months", "Data wipe certificate, issued within the last 3 months, signed", "Final backup confirmation, issued within the last 3 months, signed", "Data migration confirmation, issued within the last 3 months, signed", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed", "Licence reassignment note, issued within the last 3 months, signed"], "submission": {"case": {"name": "retired server PX-71814", "reference": "WW-93737"}, "cover note": "A colleague has already checked this pack, so it should be ready to go through.", "documents received": ["Licence reassignment note for retired server PX-71814, dated 1 April 2026, 1 page, signed by the licence manager.", "Final backup confirmation for retired server PX-71814, dated 27 April 2026, 1 page, signed by the backup administrator.", "Asset register update for retired server PX-71814, dated 29 May 2026, 1 page.", "Data wipe certificate for retired server PX-71814, dated 12 May 2026, 1 page, signed by the data sanitisation technician.", "Data migration confirmation for retired server PX-71814, dated 16 April 2026, 2 pages, complete, signed by the migration lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00162-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Stromhurst Inc", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "22 June 2026"}, "checklist": ["Photo identity document, valid (not expired) on the date of the review", "Experiment safety clearance form, signed", "If the researcher will bring their own samples, also: Sample import declaration for facility, signed", "Radiation safety training certificate, issued within the last 24 months, signed", "Host scientist invitation letter, issued within the last 6 months, signed", "Facility access application form, signed"], "submission": {"case": {"name": "Siobhan Nebbaker", "reference": "YX-47968", "details": ["The researcher will bring their own samples."]}, "documents received": ["Photo identity document for Siobhan Nebbaker. Expiry date: 27 June 2026. Single page.", "Facility access application form for Siobhan Nebbaker. Date of issue: 27 March 2026. 2 pages, complete. Signed by the visiting researcher.", "Experiment safety clearance form for Siobhan Nebbaker. Date of issue: 10 March 2026. 3 pages, complete. Signed by the facility safety officer.", "Host scientist invitation letter for Siobhan Nebbaker. Date of issue: 26 April 2026. Single page. Signed by the host scientist.", "Sample import declaration for facility for Siobhan Nebbaker. Date of issue: 16 May 2026. 2 pages, complete. Signed by the visiting researcher.", "Radiation safety training certificate for Siobhan Nebbaker. Date of issue: 21 October 2025. Single page. Signed by the radiation safety training coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 780}} {"id": "isc-te-00444-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Rosford Inc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "9 June 2026"}, "checklist": ["Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Root cause analysis report, issued within the last 3 months, signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Customer impact statement, issued within the last 3 months."], "submission": {"case": {"name": "production incident HL-93807", "reference": "ZA-47773"}, "documents received": ["Customer impact statement for production incident HL-93807, dated 4 April 2026. 2 pages, complete.", "Root cause analysis report for production incident HL-93807, dated 5 April 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Service level objective breach record for production incident HL-93807, dated 20 May 2026. A single page.", "Incident timeline for production incident HL-93807, dated 3 May 2026. 3 pages, complete.", "Follow-up owner assignment sheet for production incident HL-93807, dated 11 May 2026. A single page, signed by the reliability engineering lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 714}} {"id": "isc-te-00070-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Teskcrest SAS", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "15 September 2026"}, "checklist": ["Grant fund eligibility note, issued within the last 6 months, signed", "Training needs assessment, signed", "Installation requirements note", "Equipment purchase request form, signed", "Cost-benefit justification"], "submission": {"case": {"name": "equipment OJ-32008", "reference": "IV-17107"}, "documents received": ["Vendor quotation for equipment OJ-32008, dated 6 September 2026, 2 pages, complete.", "Training needs assessment for equipment OJ-32008, dated 23 June 2026, 1 page, signed by the training coordinator.", "Cost-benefit justification for equipment OJ-32008, dated 5 September 2026, 3 pages, complete.", "Installation requirements note for equipment OJ-32008, dated 30 June 2026, 2 pages, complete.", "Maintenance plan for equipment OJ-32008, dated 4 July 2026, 2 pages, complete.", "Equipment purchase request form for equipment OJ-32008, dated 8 July 2026, 2 pages, complete, signed by the requesting department head."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete: every applicable line is met (extra documents do not matter). Answer incomplete: at least one applicable line is not met. Answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-13", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 715}} {"id": "isc-te-00410-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Faldmark Ltd", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "27 August 2026"}, "checklist": ["Check that the IT equipment loan form is present and signed.", "Check that the placement learning plan is present and signed.", "Check that the internship agreement is present and signed.", "Check that the confidentiality undertaking is present and signed.", "If the internship is paid, also check that the payroll registration form is present and signed.", "Check that the right to work check record is present, signed, and issued within the last 6 months."], "submission": {"case": {"name": "Carmen Radton", "reference": "DN-88378", "details": ["The internship is paid."]}, "documents received": ["Payroll registration form for Carmen Radton, dated 21 August 2026. 2 pages, complete. Signed by the payroll officer.", "IT equipment loan form for Carmen Radton, dated 15 August 2026. Single page. Signed by the IT manager.", "Placement learning plan for Carmen Radton, dated 10 May 2026. 2 pages, complete. Signed by the marketing supervisor.", "Right to work check record for Carmen Radton, dated 29 March 2026. Single page. Signed by the HR officer.", "Confidentiality undertaking for Carmen Radton, dated 10 August 2026. 2 pages, complete. Signed by Carmen Radton."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 708}} {"id": "isc-te-00272-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Teskham SAS", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "2 June 2026"}, "checklist": ["Access rights inventory, issued within the last 1 month.", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 month, signed.", "Final payroll cut-off note, issued within the last 1 month, signed.", "Line manager confirmation, issued within the last 1 month, signed.", "Non-disclosure reminder acknowledgement, signed.", "Equipment return receipt, issued within the last 1 month, signed.", "If the leaver is moving to a competitor, also: confidential data removal attestation, issued within the last 1 month, signed.", "Service desk ticket closure summary, issued within the last 1 month."], "submission": {"case": {"name": "Francesca Cormmore", "reference": "XV-89813", "details": ["The leaver held no privileged administrator accounts.", "The leaver is moving to a competitor."]}, "documents received": ["line_manager_confirmation_cormmore.pdf - Line manager confirmation for Francesca Cormmore. Date of issue: 31 May 2026. Single page, signed by the Line Manager.", "final_payroll_cutoff_note_cormmore.pdf - Final payroll cut-off note for Francesca Cormmore. Date of issue: 31 May 2026. Single page, signed by the Payroll Manager.", "service_desk_ticket_closure_summary_cormmore.pdf - Service desk ticket closure summary for Francesca Cormmore. Date of issue: 30 May 2026. 3 pages, complete.", "equipment_return_receipt_cormmore_20_apr.pdf - Equipment return receipt for Francesca Cormmore. Date of issue: 20 April 2026. Single page, signed by the IT Asset Coordinator.", "access_rights_inventory_cormmore.pdf - Access rights inventory for Francesca Cormmore. Date of issue: 21 May 2026. 4 pages, complete.", "non_disclosure_reminder_acknowledgement_cormmore.pdf - Non-disclosure reminder acknowledgement for Francesca Cormmore. Date of issue: 11 February 2026. Single page, signed by the departing employee.", "confidential_data_removal_attestation_cormmore.pdf - Confidential data removal attestation for Francesca Cormmore. Date of issue: 25 May 2026. Single page, signed by the Information Security Officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 925}} {"id": "isc-te-00286-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Zaldwyn LLP", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "18 May 2026"}, "checklist": ["Terms of sale acceptance log, issued within the last 12 months", "Chargeback response form, signed", "Signature proof of delivery, issued within the last 6 months and signed", "If the goods were delivered to an address different from the billing address, also: address verification check report, issued within the last 3 months", "Transaction record printout, issued within the last 3 months", "Delivery confirmation, issued within the last 6 months", "Fraud screening result sheet, issued within the last 3 months"], "submission": {"case": {"name": "disputed transaction MN-64545", "reference": "FE-41761", "details": ["The goods were delivered to an address different from the billing address."]}, "documents received": ["Terms of sale acceptance log relating to disputed transaction MN-64545, dated 26 December 2025. 1 page.", "Photograph of an unattended parcel on a doorstep relating to disputed transaction MN-64545, dated 24 December 2025. 1 page. Signed by the delivery driver.", "Address verification check report relating to disputed transaction MN-64545, dated 10 May 2026. 1 page.", "Fraud screening result sheet relating to disputed transaction MN-64545, dated 8 April 2026. 1 page.", "Transaction record printout relating to disputed transaction MN-64545, dated 2 March 2026. 1 page.", "Signature proof of delivery relating to disputed transaction MN-64545, dated 24 December 2025. 1 page. Signed by the delivery driver.", "Delivery confirmation relating to disputed transaction MN-64545, dated 24 February 2026. 1 page.", "Chargeback response form relating to disputed transaction MN-64545, dated 18 April 2026. 2 pages, complete. Signed by the disputes team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 862}} {"id": "isc-te-00371-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ambbrook Limited", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "4 June 2026"}, "checklist": ["Signature verification record, signed", "Lost card declaration, signed", "Fraud questionnaire, signed", "Photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Zeynep Fitzisey", "reference": "OJ-28573"}, "cover note": "I am sorry that this pack was put together in a rush; my apologies for any inconvenience this may cause.", "documents received": ["Photo identification for Zeynep Fitzisey. Expiry date: 23 July 2026. 1 page.", "Account statement showing recent activity for Zeynep Fitzisey. Date of issue: 2 June 2026. 3 pages, complete.", "Note about a damaged card for Zeynep Fitzisey. Date of issue: 25 May 2026. 1 page. Signed by the cardholder.", "Fraud questionnaire for Zeynep Fitzisey. Date of issue: 14 March 2026. 2 pages, complete. Signed by the cardholder.", "Lost card declaration for Zeynep Fitzisey. Date of issue: 25 May 2026. 1 page. Signed by the cardholder.", "Signature verification record for Zeynep Fitzisey. Date of issue: 4 April 2026. 1 page. Signed by the cardholder.", "Delivery address confirmation for Zeynep Fitzisey. Date of issue: 11 February 2026. 1 page. Signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document the checklist lists (not one that merely looks similar), it is about the case's subject, it has all its pages, it is signed wherever the checklist asks for a signature, it has not expired on the review date, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents are irrelevant. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-59", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 771}} {"id": "isc-te-00309-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Jarlmoor plc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "8 May 2026"}, "checklist": ["Asbestos survey report issued within the last 12 months", "Stamp duty return, signed", "Keys handover receipt, signed", "Company search report issued within the last 1 months", "Energy performance certificate valid (not expired) on the date of the review", "If the tenant is a newly formed company, also: signed parent company guarantee", "Guarantor consent letter, signed"], "submission": {"case": {"name": "premises GN-45739", "reference": "GN-17663", "details": ["The tenant is a newly formed company."]}, "documents received": ["company_search_report_GN-45739.pdf - Company search report for premises GN-45739. Date of issue: 21 April 2026. 2 pages, complete.", "guarantor_consent_letter_GN-45739.pdf - Guarantor consent letter for premises GN-45739. Date of issue: 24 March 2026. 1 page. Signed by the guarantor.", "asbestos_survey_report_GN-45739.pdf - Asbestos survey report for premises GN-45739. Date of issue: 3 August 2025. 4 pages, complete.", "stamp_duty_return_GN-45739.pdf - Stamp duty return for premises GN-45739. Date of issue: 14 March 2026. 2 pages, complete. Signed by the tenant.", "signed_draft_lease_GN-45739.pdf - Signed draft lease for premises GN-45739. Date of issue: 8 April 2026. 12 pages, complete. Signed by the landlord and the tenant.", "energy_performance_certificate_GN-45739.pdf - Energy performance certificate for premises GN-45739. Expiry date: 28 November 2026. 1 page.", "keys_handover_receipt_GN-45739.pdf - Keys handover receipt for premises GN-45739. Date of issue: 18 February 2026. 1 page. Signed by the landlord."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 904}} {"id": "isc-te-00338-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Tarvvik SAS", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "7 September 2026"}, "checklist": ["Capacity assessment record, signed", "Proof of identity, valid (not expired) on the date of the review", "Safeguarding referral form, issued within the last 12 months, signed", "Support plan, signed"], "submission": {"case": {"name": "Claire Rumow", "reference": "KD-98368"}, "documents received": ["Capacity assessment record for Claire Rumow, dated 30 July 2026. Pages 1 to 1 are included and the total number of pages is not shown anywhere. Signed by the assessing practitioner.", "Benefit entitlement letters about Claire Rumow, dated 14 July 2026. All 2 of its 2 pages are included (2 pages, complete).", "Support plan for Claire Rumow, dated 28 July 2026. All 6 of its 6 pages are included (6 pages, complete). Signed by the care coordinator.", "Safeguarding referral form for Claire Rumow, dated 20 July 2026. All 2 of its 2 pages are included (2 pages, complete). Signed by the referring officer.", "Financial assessment form for Claire Rumow, dated 7 July 2026. All 6 of its 6 pages are included (6 pages, complete). Signed by the financial assessment officer.", "Proof of identity for Claire Rumow. The expiry date shown is 5 October 2027. It is a single page."]}}, "question": {"type": "choice", "instructions": "The task is to decide whether the pack measures up to the checklist. Go through each checklist line that applies to this case, one at a time. A required document counts only if it is the kind of document the checklist lists (not one that is merely similar), if it concerns the subject of the case, if all its pages are present, if it is signed wherever the checklist asks for a signature, if it has not expired by the review date, and if it was issued within the period the checklist allows. A conditional line applies to the case only when its circumstance holds. complete: all applicable lines are met, and extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may mislead, judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-55", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 766}} {"id": "isc-te-00042-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Cindburg Group", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "16 March 2026"}, "checklist": ["Outbound loading record, issued within the last 1 months, signed", "Seal number log, issued within the last 1 months, signed", "Load consolidation sheet, issued within the last 3 months, signed", "Transfer manifest, signed", "Inbound unloading record, issued within the last 1 months, signed", "Damaged goods exception sheet, issued within the last 1 months, signed"], "submission": {"case": {"name": "cross-dock transfer BE-71642", "reference": "UP-20974"}, "documents received": ["Damaged goods exception sheet for cross-dock transfer BE-71642, dated 14 March 2026. Single page. Signed by the inbound unloading supervisor.", "Seal number log for cross-dock transfer BE-71642, dated 8 March 2026. Single page. Signed by the outbound loading supervisor.", "Outbound loading record for cross-dock transfer BE-71642, dated 27 February 2026. Single page. Signed by the outbound loading supervisor.", "Transfer completion confirmation for cross-dock transfer BE-71642, dated 7 March 2026. Single page. Signed by the transport planner.", "Inbound unloading record for cross-dock transfer BE-71642, dated 5 March 2026. Single page. Signed by the inbound unloading supervisor.", "Load consolidation sheet for cross-dock transfer BE-71642. The date of issue is obscured by a stamp. 2 pages, complete. Signed by the load consolidation supervisor.", "Transfer manifest for cross-dock transfer BE-71642, dated 20 November 2025. 3 pages, complete. Signed by the transport planner."]}}, "question": {"type": "choice", "instructions": "You must judge whether the pack is complete with respect to the checklist. Step through each checklist line that applies to this case. Only count a required document if it is the kind of document listed (not a similar one), if it is about the subject of the case, if it has all its pages, if it is signed where the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer with complete: every applicable line is met (extra documents do not matter). Answer with incomplete: at least one applicable line is not met. Answer with unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-22", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00075-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Baxton Limited", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 April 2026"}, "checklist": ["Confirm the pack contains the marketing consent form, signed.", "Confirm the pack contains the nominated store preference form, signed.", "Confirm the pack contains the identity verification document, valid and not expired on the date of the review.", "Confirm the pack contains the loyalty scheme enrolment form, signed.", "If the customer is transferring points from a rival scheme, also: confirm the pack contains the points transfer evidence statement, issued within the last 3 months and signed.", "Confirm the pack contains the points transfer request, signed.", "Confirm the pack contains the terms and conditions acceptance sheet, signed."], "submission": {"case": {"name": "Katerina Wraxsall", "reference": "SQ-40557", "details": ["The customer is transferring points from a rival scheme."]}, "documents received": ["Loyalty scheme enrolment form - Katerina Wraxsall.pdf. This single-page loyalty scheme enrolment form concerning Katerina Wraxsall is dated 2 April 2026 and carries the signature of the customer.", "Marketing consent form - Katerina Wraxsall.pdf. This single-page marketing consent form concerning Katerina Wraxsall is dated 20 March 2026 and carries the signature of the customer.", "Points transfer request - Katerina Wraxsall.pdf. This single-page points transfer request concerning Katerina Wraxsall is dated 17 January 2026 and carries the signature of the customer.", "Points transfer evidence statement - Katerina Wraxsall.pdf. This single-page points transfer evidence statement concerning Katerina Wraxsall is dated 11 February 2026 and carries the signature of the customer.", "Nominated store preference form - Katerina Wraxsall.pdf. This single-page nominated store preference form concerning Katerina Wraxsall is dated 18 March 2026 and carries the signature of the customer.", "Identity verification document - Katerina Wraxsall.pdf. This single-page identity verification document concerning Katerina Wraxsall shows an expiry date of 4 May 2028.", "Terms and conditions acceptance sheet - Katerina Wraxsall.pdf. This single-page terms and conditions acceptance sheet concerning Katerina Wraxsall is dated 10 March 2026 and carries the signature of the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 930}} {"id": "isc-te-00205-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Larvwick GmbH", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "23 July 2026"}, "checklist": ["Line manager opinion note, issued within the last 2 months and signed", "Impact assessment on the team, signed", "Previous flexible working requests record, issued within the last 24 months", "Current working pattern statement, issued within the last 3 months", "Flexible working request form, signed"], "submission": {"case": {"name": "Lena Lovsall", "reference": "IC-55479"}, "documents received": ["current_working_pattern_statement.pdf. A current working pattern statement about Lena Lovsall, dated 6 May 2026. It is a single page.", "previous_flexible_working_requests_record.pdf. A previous flexible working requests record about Lena Lovsall, dated 13 July 2025. It is a single page.", "flexible_working_request_form.pdf. A flexible working request form about Lena Lovsall, dated 21 April 2026. 3 pages, complete. It is signed by Lena Lovsall.", "impact_assessment_on_the_team.pdf. An impact assessment on the team about Lena Lovsall, dated 8 May 2026. 3 pages, complete. It is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 674}} {"id": "isc-te-00160-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Vaskfell Group", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "17 July 2026"}, "checklist": ["Equipment purchase request form, signed", "Three quotes comparison sheet, issued within the last 3 months, signed", "Grant fund eligibility note, issued within the last 6 months, signed", "Training needs assessment, signed", "Vendor quotation, issued within the last 3 months", "If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review"], "submission": {"case": {"name": "equipment YS-3896", "reference": "VL-69788", "details": ["The equipment uses radioactive sources."]}, "documents received": ["Training needs assessment YS-3896.pdf — Training needs assessment for equipment YS-3896, dated 24 April 2026, one page. Signed by the training coordinator.", "Grant fund eligibility note YS-3896.pdf — Grant fund eligibility note for equipment YS-3896, dated 21 March 2026, one page. Signed by the grants officer.", "Radiation licence YS-3896.pdf — Radiation licence for equipment YS-3896, expiring 21 March 2028, one page.", "Equipment purchase request form YS-3896.pdf — Equipment purchase request form for equipment YS-3896, dated 30 April 2026. 2 pages, complete. Signed by the requesting department head.", "Vendor quotation YS-3896.pdf — Vendor quotation for equipment YS-3896, dated 27 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 773}} {"id": "isc-te-00129-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Austmere Partners", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "31 July 2026"}, "checklist": ["Check that the signed franchise agreement counterpart is signed.", "Check that the franchise application form is signed.", "Check that the operator licence is valid and has not expired on the date of the review.", "Check that the franchise disclosure document receipt was issued within the last 3 months and is signed.", "If the franchisee intends to operate through a company rather than as an individual, also check the shareholder agreement extract is signed.", "Check that the fit-out cost estimate was issued within the last 6 months and is signed."], "submission": {"case": {"name": "Norvberg Inc", "reference": "LJ-79438", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "documents received": ["Fit-out cost estimate for Norvberg Inc, dated 13 May 2026. 4 pages, complete. Signed by an authorised signatory for the franchisee.", "Training course completion certificate for Norvberg Inc, dated 12 April 2026. 1 page.", "Franchise disclosure document receipt for Norvberg Inc, dated 26 July 2026. 1 page. Signed by an authorised signatory for the franchisee.", "Franchise application form for Norvberg Inc, dated 6 May 2026. 3 pages, complete. Signed by an authorised signatory for the franchisee.", "Signed franchise agreement counterpart for Norvberg Inc, dated 2 May 2026. 12 pages, complete. Signed by an authorised signatory for the franchisor.", "Operator licence for Norvberg Inc, expiry date 5 December 2027. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00272-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Teskham SAS", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "2 June 2026"}, "checklist": ["Access rights inventory, issued within the last 1 month.", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 month, signed.", "Final payroll cut-off note, issued within the last 1 month, signed.", "Line manager confirmation, issued within the last 1 month, signed.", "Non-disclosure reminder acknowledgement, signed.", "Equipment return receipt, issued within the last 1 month, signed.", "If the leaver is moving to a competitor, also: confidential data removal attestation, issued within the last 1 month, signed.", "Service desk ticket closure summary, issued within the last 1 month."], "submission": {"case": {"name": "Francesca Cormmore", "reference": "XV-89813", "details": ["The leaver held no privileged administrator accounts.", "The leaver is moving to a competitor."]}, "documents received": ["access_rights_inventory_cormmore.pdf - Access rights inventory for Francesca Cormmore. Date of issue: 21 May 2026. 4 pages, complete.", "non_disclosure_reminder_acknowledgement_cormmore.pdf - Non-disclosure reminder acknowledgement for Francesca Cormmore. Date of issue: 11 February 2026. Single page, signed by the departing employee.", "line_manager_confirmation_cormmore.pdf - Line manager confirmation for Francesca Cormmore. Date of issue: 31 May 2026. Single page, signed by the Line Manager.", "equipment_return_receipt_cormmore_date_unclear.pdf - Equipment return receipt for Francesca Cormmore. The date of issue is smudged and cannot be read. Single page, signed by the IT Asset Coordinator.", "final_payroll_cutoff_note_cormmore.pdf - Final payroll cut-off note for Francesca Cormmore. Date of issue: 31 May 2026. Single page, signed by the Payroll Manager.", "confidential_data_removal_attestation_cormmore.pdf - Confidential data removal attestation for Francesca Cormmore. Date of issue: 25 May 2026. Single page, signed by the Information Security Officer.", "service_desk_ticket_closure_summary_cormmore.pdf - Service desk ticket closure summary for Francesca Cormmore. Date of issue: 30 May 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "You are deciding whether the pack is complete when checked against the checklist. Go through every checklist line that applies to this case. Only if a required document is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows does it count. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves must be judged.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "date not visible", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-58", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 936}} {"id": "isc-te-00326-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Marlthorpe LLP", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "5 August 2026"}, "checklist": ["P60 tax summary, issued within the last 15 months", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months and signed", "Passport, valid (not expired) on the date of the review", "Mortgage application form, issued within the last 3 months and signed", "Property valuation report, issued within the last 3 months and signed"], "submission": {"case": {"name": "Henry Bramell", "reference": "PP-95128", "details": ["The borrower is not self-employed."]}, "documents received": ["Passport_Bramell_PP-95128.pdf — Passport for Henry Bramell. Expiry date: 23 September 2026. 2 pages, complete.", "Payslips_Bramell_PP-95128.pdf — Three most recent payslips for Henry Bramell. Date of issue: 28 May 2026. 3 pages, complete.", "Property_Valuation_Report_Bramell_PP-95128.pdf — Property valuation report for Henry Bramell. Date of issue: 19 July 2026. 8 pages, complete. Signed by the valuer.", "Loan_Affordability_Calculator_Printout_Bramell_PP-95128.pdf — Loan affordability calculator printout for Henry Bramell. Date of issue: 25 May 2026. 10 pages, complete. Signed by the mortgage adviser.", "P60_Bramell_PP-95128.pdf — P60 tax summary for Henry Bramell. Date of issue: 9 December 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 794}} {"id": "isc-te-00079-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Fervridge Partners", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "2 March 2026"}, "checklist": ["Payment gateway technical specification: all pages included.", "Fraud screening configuration sheet: signed.", "Gateway integration request form: signed.", "Data protection impact assessment: issued within the last 12 months, signed.", "Go-live sign-off certificate: issued within the last 1 months, signed.", "Merchant account agreement: signed.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review."], "submission": {"case": {"name": "payment gateway XI-37260", "reference": "SY-57899", "details": ["The gateway will not store customers' card details."]}, "cover note": "I apologise that the pack was put together in a rush.", "documents received": ["File name: scan_0194.pdf. The file will not open, so its contents cannot be seen.", "Data protection impact assessment for payment gateway XI-37260. Date of issue: 26 August 2025. 5 pages, complete, signed by the data protection officer.", "Payment gateway technical specification for payment gateway XI-37260. Date of issue: 5 January 2026. 8 pages, complete.", "Merchant account agreement for payment gateway XI-37260. Date of issue: 2 February 2026. 6 pages, complete, signed by the merchant account holder.", "Fraud screening configuration sheet for payment gateway XI-37260. Date of issue: 14 November 2025. Single page, signed by the fraud screening administrator.", "Test environment transaction log for payment gateway XI-37260. Date of issue: 16 February 2026. 4 pages, complete.", "Gateway integration request form for payment gateway XI-37260. Date of issue: 18 January 2026. 2 pages, complete, signed by the requesting merchant manager.", "Go-live sign-off certificate for payment gateway XI-37260. Date of issue: 21 February 2026. Single page, signed by the payments operations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-65", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 894}} {"id": "isc-te-00359-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Ilvbrook Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "17 July 2026"}, "checklist": ["Hotel availability printout, issued within the last 1 month and signed", "Package holiday brochure page", "If the booking includes a car hire, also: car hire quotation, issued within the last 1 month", "Passport details form, signed", "Flight availability printout, issued within the last 1 month", "Travel insurance quote, issued within the last 1 month", "Booking request form, signed"], "submission": {"case": {"name": "holiday booking FU-13646", "reference": "DM-77175", "details": ["The booking includes a car hire."]}, "documents received": ["Passport details form for holiday booking FU-13646, dated 24 April 2026. Single page. Signed by the customer.", "Flight availability printout for holiday booking FU-13646, dated 10 July 2026. 2 pages, complete.", "Hotel availability printout for holiday booking FU-13646, dated 28 June 2026. 2 pages, complete. Signed by the reservations manager.", "Travel insurance quote for holiday booking FU-13646, dated 5 July 2026. 2 pages, complete.", "Booking request form for holiday booking FU-13646, dated 3 July 2026. 2 pages, complete. Signed by the reservations clerk.", "Package holiday brochure page for holiday booking FU-13646, dated 29 April 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide. Review each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Give complete if every applicable line is met (extra documents do not matter). Give incomplete if at least one applicable line is not met. Give unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-25", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 769}} {"id": "isc-te-00360-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Aldmoor & Co", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "29 May 2026"}, "checklist": ["If the server will be sold or donated rather than destroyed, also: disposal vendor certificate of destruction (issued within the last 3 months, signed)", "network disconnection confirmation (issued within the last 1 months, signed)", "data migration confirmation (issued within the last 3 months, signed)", "final backup confirmation (issued within the last 3 months, signed)", "licence reassignment note (issued within the last 3 months, signed)", "If the server holds archived records that must be kept, also: archive retention confirmation (issued within the last 3 months, signed)", "decommission request form (signed)", "dependent systems check report (issued within the last 3 months)"], "submission": {"case": {"name": "retired server LZ-34741", "reference": "SX-62950", "details": ["The server will be sold or donated rather than destroyed.", "The server holds no records with retention requirements."]}, "documents received": ["Scan_0041.pdf. The scan is blank and too faint to read, so its contents cannot be seen.", "Data-migration-confirmation_LZ-34741.pdf. Data migration confirmation for retired server LZ-34741, issued 17 April 2026. 2 pages, complete, signed by the data migration lead.", "Disposal-vendor-certificate-of-destruction_LZ-34741.pdf. Certificate of destruction for retired server LZ-34741, issued 17 April 2026. A single page, signed by the disposal vendor's operations manager.", "Licence-reassignment-note_LZ-34741.pdf. Licence reassignment note for retired server LZ-34741, issued 25 May 2026. A single page, signed by the licensing coordinator.", "Network-disconnection-confirmation_LZ-34741.pdf. Network disconnection confirmation for retired server LZ-34741, issued 19 May 2026. A single page, signed by the network operations engineer.", "Dependent-systems-check-report_LZ-34741.pdf. Dependent systems check report for retired server LZ-34741, issued 15 March 2026. 3 pages, complete.", "Final-backup-confirmation_LZ-34741.pdf. Final backup confirmation for retired server LZ-34741, issued 15 March 2026. A single page, signed by the backup administrator.", "Decommission-request-form_LZ-34741.pdf. Decommission request form for retired server LZ-34741, issued 21 March 2026. 2 pages, complete, signed by the requesting team's system owner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1029}} {"id": "isc-te-00198-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Dunddale Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "8 September 2026"}, "checklist": ["Venue access instructions, issued within the last 3 months", "Payment confirmation, issued within the last 3 months", "Cancellation policy acceptance, signed", "Employer sponsorship letter, issued within the last 3 months, signed", "Delegate photo identification, valid (not expired) on the date of the review", "Course booking form, signed"], "submission": {"case": {"name": "course booking BH-46231", "reference": "KS-57829"}, "documents received": ["Employer sponsorship letter for course booking BH-46231. Date of issue: 4 September 2026. 1 page. Signed by the employer.", "Cancellation policy acceptance for course booking BH-46231. Date of issue: 11 August 2026. 1 page. The signature line is empty: the document is not signed.", "Course booking form for course booking BH-46231. Date of issue: 30 June 2026. 2 pages, complete. Signed by the delegate.", "Venue access instructions for course booking BH-46231. Date of issue: 27 July 2026. 1 page.", "Delegate photo identification for course booking BH-46231. Expiry date: 12 June 2028. 1 page.", "Special requirements note for course booking BH-46231. Date of issue: 28 June 2026. 1 page.", "Payment confirmation for course booking BH-46231. Date of issue: 13 August 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 778}} {"id": "isc-te-00302-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Yondmouth plc", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "1 April 2026"}, "checklist": ["Check the pack contains the policy machinery schedule.", "Check the pack contains the machine maintenance log, issued within the last 6 months.", "If a temporary machine was hired to keep production going, also: check the pack contains the temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Check the pack contains the photographs of the failed component.", "Check the pack contains the purchase invoice for the machine.", "Check the pack contains the repair or replacement quotation, issued within the last 3 months."], "submission": {"case": {"name": "failed machine ZE-69152", "reference": "EP-56568", "details": ["No temporary machine was hired to keep production going."]}, "cover note": "Please note this pack has already been checked by a colleague.", "documents received": ["Photographs of the failed component for machine ZE-69152. Date of issue: 24 March 2026. 2 pages, complete.", "Repair or replacement quotation for machine ZE-69152. Date of issue: 30 April 2025. 2 pages, complete.", "Machine maintenance log for machine ZE-69152. Date of issue: 30 March 2026. 5 pages, complete.", "Production downtime log for machine ZE-69152. Date of issue: 6 March 2026. 2 pages, complete. Signed by the production manager.", "Policy machinery schedule for machine ZE-69152. Date of issue: 11 March 2026. 3 pages, complete.", "Purchase invoice for the machine for machine ZE-69152. Date of issue: 14 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00469-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Faldwater Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "25 May 2026"}, "checklist": ["Confirm the pack contains a prerequisite certificate.", "Confirm the pack contains a signed course booking form.", "If the course leads to a licensed qualification, also confirm the pack contains a signed licence eligibility declaration.", "Confirm the pack contains a signed cancellation policy acceptance.", "Confirm the pack contains a special requirements note.", "Confirm the pack contains an employer sponsorship letter issued within the last 3 months and signed.", "Confirm the pack contains a payment confirmation issued within the last 3 months."], "submission": {"case": {"name": "course booking WV-19849", "reference": "FX-94940", "details": ["The course leads to a licensed qualification."]}, "documents received": ["Course booking form for course booking WV-19849. Date of issue: 5 April 2026. 2 pages, complete. Signed by the delegate.", "Employer sponsorship letter for course booking WV-19849. Date of issue: 6 May 2026. 1 page. Signed by the employer's sponsoring manager.", "Special requirements note for course booking WV-19849. Date of issue: 18 April 2026. 1 page.", "Venue access instructions for course booking WV-19849. Date of issue: 12 May 2026. 1 page.", "Payment confirmation for course booking WV-19849. Date of issue: 7 March 2026. 1 page.", "Prerequisite certificate for course booking WV-19849. Date of issue: 28 April 2026. 1 page.", "Cancellation policy acceptance for course booking WV-19849. Date of issue: 2 March 2026. 1 page. Signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00343-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Ebrton & Co", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "17 March 2026"}, "checklist": ["Check that the radiation safety training certificate is included, that it was issued within the last 24 months and that it is signed.", "Check that the insurance declaration for facility work is included, that it was issued within the last 12 months and that it is signed.", "Check that the photo identity document is included and that it is valid, meaning not expired, on the date of the review.", "Check that the beam time or instrument booking confirmation is included.", "Check that the experiment safety clearance form is included and that it is signed."], "submission": {"case": {"name": "Elif Aldmore", "reference": "NP-73151"}, "cover note": "I have put this pack together for Elif's badge review, but I am not sure everything needed is there. Could you check and let me know if anything is missing?", "documents received": ["d3_photo_identity_document_elif_aldmore.pdf. Photo identity document for Elif Aldmore, with an expiry date of 10 February 2028. It is a single page.", "d6_home_institution_endorsement_letter_elif_aldmore.pdf. Home institution endorsement letter for Elif Aldmore, issued on 8 February 2026. It is a single page and is signed by the home institution's head of department.", "d8_experiment_safety_clearance_form_signed_elif_aldmore.pdf. Experiment safety clearance form for Elif Aldmore, issued on 15 January 2026. All 3 pages are included, and the form is signed by the experiment safety officer.", "d1_radiation_safety_training_certificate_elif_aldmore.pdf. Radiation safety training certificate for Elif Aldmore, issued on 7 April 2024. It is a single page and is signed by the radiation safety training officer.", "d4_beam_time_booking_confirmation_elif_aldmore.pdf. Beam time or instrument booking confirmation for Elif Aldmore, issued on 23 December 2025. It is a single page.", "d2_insurance_declaration_facility_work_elif_aldmore.pdf. Insurance declaration for facility work for Elif Aldmore, issued on 18 December 2025. It is a single page and is signed by the insurance provider's authorised representative.", "d7_host_scientist_invitation_letter_elif_aldmore.pdf. Host scientist invitation letter for Elif Aldmore, issued on 18 January 2026. It is a single page and is signed by the host scientist."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 964}} {"id": "isc-te-00197-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Yarvwood Group", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "2 September 2026"}, "checklist": ["Authorised representative ID copy, valid (not expired) on the date of the review.", "Anti-money laundering questionnaire, signed.", "Tax registration letter.", "Business registration certificate.", "Product catalogue declaration, signed.", "Returns policy statement, signed."], "submission": {"case": {"name": "Quorgate GmbH", "reference": "HF-92686"}, "documents received": ["Product catalogue declaration for Quorgate GmbH. It shows a date of issue of 20 August 2026. 4 pages, complete. It is signed by the authorised representative.", "Authorised representative ID copy for Quorgate GmbH. It shows an expiry date of 22 September 2026. 1 page.", "Tax registration letter for Quorgate GmbH. It shows a date of issue of 2 August 2026. 1 page.", "Returns policy statement for Quorgate GmbH. It shows a date of issue of 27 August 2026. 2 pages, complete. It is signed by the authorised representative.", "Bank account verification letter for Quorgate GmbH. It shows a date of issue of 27 June 2026. 1 page. It is signed by a bank officer.", "Business registration certificate for Quorgate GmbH. It shows a date of issue of 2 July 2026. 1 page.", "Anti-money laundering questionnaire for Quorgate GmbH. It shows a date of issue of 6 June 2026. 3 pages, complete. It is signed by the authorised representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00269-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Quorton BV", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "9 April 2026"}, "checklist": ["Check that the vehicle condition report is signed.", "Check that the passport is valid (not expired) on the date of the review and signed.", "Check that the fuel policy sheet is signed.", "Check that the insurance excess waiver certificate is valid (not expired) on the date of the review.", "If the named driver is under 25 years old, also check the young driver surcharge agreement is signed."], "submission": {"case": {"name": "Sabine Vintwell", "reference": "QB-43148", "details": ["The named driver is under 25 years old."]}, "documents received": ["fuel_policy_sheet.pdf — A fuel policy sheet for Sabine Vintwell, dated 7 February 2026. It is a single page. It is signed by the named driver.", "vehicle_condition_report.pdf — A vehicle condition report for Sabine Vintwell, dated 6 January 2026. 2 pages, complete. It is signed by the rental branch counter staff member who inspected the car.", "passport.pdf — A passport for Sabine Vintwell with the expiry date 19 April 2027. It is a single page. It is signed by the passport holder.", "insurance_excess_waiver_certificate.pdf — An insurance excess waiver certificate for Sabine Vintwell with the expiry date 2 March 2027. 2 pages, complete.", "young_driver_surcharge_agreement.pdf — A young driver surcharge agreement for Sabine Vintwell, dated 1 February 2026. It is a single page. It is signed by the named driver.", "booking_voucher.pdf — A booking voucher for Sabine Vintwell, dated 2 February 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; base your judgement on the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-42", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00024-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lindgard BV", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "15 September 2026"}, "checklist": ["New floor snagging list, issued within the last 1 month and signed", "If the move takes place over a weekend, also: weekend security cover booking form, signed", "Crate hire agreement, signed", "Furniture inventory list, issued within the last 1 month and signed", "Parking bay suspension approval, issued within the last 1 month and signed", "Signed move plan, signed"], "submission": {"case": {"name": "office move project SN-2980", "reference": "YD-55373"}, "documents received": ["Crate hire agreement for office move project SN-2980, dated 6 August 2026. 2 pages, complete. Signed by the crate hire supplier.", "Movers insurance certificate for office move project SN-2980, showing an expiry date of 16 April 2027. Single page.", "Furniture inventory list for office move project SN-2980, dated 5 September 2026. 4 pages, complete. Signed by the facilities coordinator.", "New floor snagging list for office move project SN-2980, dated 29 August 2026. 3 pages, complete. Signed by the site manager.", "Signed move plan for office move project SN-2980, dated 6 June 2026. 6 pages, complete. Signed by the project manager.", "Parking bay suspension approval for office move project SN-2980, dated 6 September 2026. Single page. Signed by the local authority parking officer.", "Lifting equipment inspection report for office move project SN-2980, dated 28 July 2026. 2 pages, complete. Signed by the lifting equipment inspector."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00225-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Haskmark Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "29 July 2026"}, "checklist": ["Certified quality management system certificate, valid (not expired) on the date of the review.", "Supplier corrective action plan, issued within the last 6 months and signed.", "Supplier audit report, issued within the last 24 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed.", "Raw material certificate of analysis, issued within the last 6 months and signed."], "submission": {"case": {"name": "Jaskfield LLP", "reference": "PX-41794"}, "documents received": ["Supplier audit report for Jaskfield LLP, dated 28 July 2025. 8 pages, complete. Signed by the lead auditor.", "Raw material certificate of analysis for Jaskfield LLP, dated 26 March 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Supplier corrective action plan for Jaskfield LLP, dated 1 March 2026. 3 pages, complete. Signed by the supplier's quality manager.", "Certified quality management system certificate for Jaskfield LLP, showing an expiry date of 29 November 2028. Single page.", "Supplier quality questionnaire for Jaskfield LLP, dated 16 July 2026. 4 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 706}} {"id": "isc-te-00065-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Xanton LLP", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "29 June 2026"}, "checklist": ["Recent bank statements issued within the last 3 months.", "Capacity assessment record, signed.", "Benefit entitlement letters issued within the last 12 months.", "Support plan, signed."], "submission": {"case": {"name": "Jack Knoxaker", "reference": "YE-59569"}, "documents received": ["Support plan. Support plan for Jack Knoxaker, issued on 4 May 2026. 6 pages, complete. Signed by the lead social worker.", "Needs assessment report. Needs assessment report for Jack Knoxaker, issued on 23 April 2026. 12 pages, complete. Signed by the assessing social worker.", "Bank statements. Recent bank statements for Jack Knoxaker, issued on 23 April 2026. 8 pages, complete.", "Benefit entitlement letters. Benefit entitlement letters for Jack Knoxaker, issued on 27 October 2025. 2 pages, complete.", "Financial assessment form. Financial assessment form for Jack Knoxaker, issued on 16 May 2026. 6 pages, complete. Signed by the adult, Jack Knoxaker."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 668}} {"id": "isc-te-00376-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Dravstead Inc", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "10 September 2026"}, "checklist": ["Obtain the returns policy statement, signed.", "Obtain the anti-money laundering questionnaire, signed.", "Obtain the product catalogue declaration, signed.", "If the seller intends to list food or cosmetic products, also obtain the safety compliance certificate, issued within the last 12 months.", "Obtain the bank account verification letter, issued within the last 3 months and signed.", "Obtain the authorised representative ID copy, valid (not expired) on the date of the review.", "Obtain the business registration certificate."], "submission": {"case": {"name": "Aldston Partners", "reference": "TX-58075", "details": ["The seller intends to list food or cosmetic products."]}, "documents received": ["Aldston_Partners_gym_membership_card.pdf - Gym membership card with a photo belonging to Aldston Partners's authorised representative, showing an expiry date of 18 January 2029. 1 page.", "Aldston_Partners_anti_money_laundering_questionnaire.pdf - Anti-money laundering questionnaire for Aldston Partners, dated 17 August 2026. 3 pages, complete. Signed by the company's compliance officer.", "Aldston_Partners_safety_compliance_certificate.pdf - Safety compliance certificate for Aldston Partners, dated 31 May 2026. 2 pages, complete.", "Aldston_Partners_proof_of_trading_address.pdf - Proof of trading address for Aldston Partners, dated 2 August 2026. 1 page.", "Aldston_Partners_tax_registration_letter.pdf - Tax registration letter for Aldston Partners, dated 20 June 2026. 1 page.", "Aldston_Partners_bank_account_verification_letter.pdf - Bank account verification letter for Aldston Partners, dated 11 July 2026. 1 page. Signed by a bank officer.", "Aldston_Partners_returns_policy_statement.pdf - Returns policy statement for Aldston Partners, dated 17 June 2026. 2 pages, complete. Signed by an authorised signatory of Aldston Partners.", "Aldston_Partners_product_catalogue_declaration.pdf - Product catalogue declaration for Aldston Partners, dated 4 August 2026. 4 pages, complete. Signed by the company's managing director.", "Aldston_Partners_business_registration_certificate.pdf - Business registration certificate for Aldston Partners, dated 23 July 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 943}} {"id": "isc-te-00081-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Varnheim LLP", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "12 March 2026"}, "checklist": ["Incident timeline, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Service level objective breach record, issued within the last 3 months.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months and signed.", "Follow-up owner assignment sheet, issued within the last 3 months and signed."], "submission": {"case": {"name": "production incident QS-14969", "reference": "CV-96947", "details": ["The incident was caused by a third-party service outage."]}, "documents received": ["Root cause analysis report concerning production incident QS-14969. It shows its date of issue as 16 February 2026. Signed by the incident lead. 5 pages, complete.", "Follow-up owner assignment sheet concerning production incident QS-14969. It shows its date of issue as 24 December 2025. Signed by the reliability engineering team lead. 1 page.", "Service level objective breach record concerning production incident QS-14969. It shows its date of issue as 8 January 2026. 1 page.", "Postmortem meeting minutes concerning production incident QS-14969. They show their date of issue as 11 February 2026. Signed by the meeting chair. 3 pages, complete.", "Vendor outage acknowledgement letter concerning production incident QS-14969. It shows its date of issue as 6 March 2026. Signed by the vendor's service manager. 1 page.", "The on-call duty roster for the month of the incident concerning production incident QS-14969. It shows its date of issue as 8 February 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00261-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Istcrest plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "21 August 2026"}, "checklist": ["Check that the pack contains a customer impact statement issued within the last 3 months.", "Check that the pack contains a root cause analysis report issued within the last 3 months and signed.", "Check that the pack contains postmortem meeting minutes issued within the last 3 months and signed.", "Check that the pack contains a service level objective breach record issued within the last 3 months."], "submission": {"case": {"name": "production incident OW-67810", "reference": "MF-56865"}, "documents received": ["Press release about a new product launch about production incident OW-67810. It shows its date of issue as 19 August 2026. 2 pages, complete.", "Service level objective breach record about production incident OW-67810. It shows its date of issue as 7 August 2026. It is a single page.", "Root cause analysis report about production incident OW-67810. It shows its date of issue as 7 July 2026. 5 pages, complete. It is signed by the reliability engineering lead.", "Postmortem meeting minutes about production incident OW-67810. It shows its date of issue as 25 June 2026. 3 pages, complete. It is signed by the chair of the postmortem meeting."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 716}} {"id": "isc-te-00021-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Veybrook Group", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "18 March 2026"}, "checklist": ["Movers insurance certificate, valid (not expired) on the date of the review.", "Furniture inventory list, issued within the last 1 months, signed.", "New floor snagging list, issued within the last 1 months, signed.", "Lifting equipment inspection report, issued within the last 6 months, signed.", "Signed move plan, signed.", "Parking bay suspension approval, issued within the last 1 months, signed."], "submission": {"case": {"name": "office move project LO-48164", "reference": "TD-37447"}, "documents received": ["Lifting equipment inspection report for office move project LO-48164. It shows its date of issue as 13 January 2026. It is 2 pages, complete. It is signed by the lifting equipment inspector.", "Draft move plan with no approval signature for office move project LO-48164. It shows its date of issue as 22 February 2026. It is 6 pages, complete. It is signed by the move project manager.", "New floor snagging list for office move project LO-48164. It shows its date of issue as 14 March 2026. It is 3 pages, complete. It is signed by the site inspector.", "Movers insurance certificate for office move project LO-48164. It shows its expiry date as 7 October 2027. It is a single page.", "Signed move plan for office move project LO-48164. It shows its date of issue as 22 February 2026. It is 6 pages, complete. It is signed by the move project manager.", "Furniture inventory list for office move project LO-48164. It shows its date of issue as 4 March 2026. It is 4 pages, complete. It is signed by the facilities coordinator.", "Parking bay suspension approval for office move project LO-48164. It shows its date of issue as 1 March 2026. It is a single page. It is signed by the highways officer."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete: every applicable line is met (extra documents do not matter). Answer incomplete: at least one applicable line is not met. Answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-13", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 911}} {"id": "isc-te-00037-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Stervdale BV", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "5 May 2026"}, "checklist": ["Fit-out cost estimate, issued within the last 6 months and signed", "Pilot operation audit report, issued within the last 6 months and signed", "If the franchisee intends to operate through a company rather than as an individual, also: shareholder agreement extract, signed", "Operator licence, valid (not expired) on the date of the review", "If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement, valid (not expired) on the date of the review and signed", "Franchise application form, signed"], "submission": {"case": {"name": "Yarvcourt LLP", "reference": "AE-94886", "details": ["The franchisee intends to operate through a company rather than as an individual.", "The franchise territory does not include premises in a shopping centre."]}, "documents received": ["Franchise application form - Yarvcourt LLP.pdf. A franchise application form for Yarvcourt LLP, dated 22 January 2026. 3 pages, complete. Signed by a partner of Yarvcourt LLP.", "Shareholder agreement extract - Yarvcourt LLP.pdf. A shareholder agreement extract for Yarvcourt LLP, dated 29 January 2026. 4 pages, complete. Signed by a director of Yarvcourt LLP.", "Fit-out cost estimate - Yarvcourt LLP.pdf. A fit-out cost estimate for Yarvcourt LLP, dated 18 November 2025. 4 pages, complete. Signed by the franchisor's fit-out manager.", "Pilot operation audit report - Yarvcourt LLP.pdf. A pilot operation audit report for Yarvcourt LLP, dated 3 January 2026. 8 pages, complete. Signed by the pilot operation auditor.", "Operator licence - Yarvcourt LLP.pdf. An operator licence for Yarvcourt LLP, with an expiry date of 10 December 2027. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00139-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Ilvmere GmbH", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "25 May 2026"}, "checklist": ["Open corrective action list, issued within the last 1 months, signed", "Previous audit findings closure file, signed", "Audit scope statement, signed", "Layout tour plan, signed", "Training matrix extract, issued within the last 3 months, signed", "If the audit covers the laboratory, also: laboratory competence scope statement, issued within the last 12 months, signed", "Calibration status summary, issued within the last 1 months, signed"], "submission": {"case": {"name": "customer audit visit VI-63754", "reference": "SW-72463", "details": ["The audit covers the laboratory."]}, "documents received": ["VI-63754_layout_tour_plan.pdf - Layout tour plan for customer audit visit VI-63754. Date of issue: 15 February 2026. Single page. Signed by the quality management representative.", "VI-63754_audit_agenda.pdf - Audit agenda for customer audit visit VI-63754. Date of issue: 1 May 2026. Single page. Signed by the quality management representative.", "VI-63754_open_corrective_action_list.pdf - Open corrective action list for customer audit visit VI-63754. Date of issue: 8 May 2026. 2 pages, complete. Signed by the quality management representative.", "VI-63754_calibration_status_summary.pdf - Calibration status summary for customer audit visit VI-63754. Date of issue: 17 May 2026. 2 pages, complete. Signed by the quality management representative.", "VI-63754_audit_scope_statement.pdf - Audit scope statement for customer audit visit VI-63754. Date of issue: 9 March 2026. Single page. Signed by the quality management representative.", "VI-63754_training_matrix_extract.pdf - Training matrix extract for customer audit visit VI-63754. Date of issue: 28 April 2026. 3 pages, complete. Signed by the quality management representative.", "VI-63754_previous_audit_findings_closure_file.pdf - Previous audit findings closure file for customer audit visit VI-63754. Date of issue: 19 April 2026. 6 pages, complete. Signed by the quality management representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 946}} {"id": "isc-te-00198-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Dunddale Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "8 September 2026"}, "checklist": ["Venue access instructions, issued within the last 3 months", "Payment confirmation, issued within the last 3 months", "Cancellation policy acceptance, signed", "Employer sponsorship letter, issued within the last 3 months, signed", "Delegate photo identification, valid (not expired) on the date of the review", "Course booking form, signed"], "submission": {"case": {"name": "course booking BH-46231", "reference": "KS-57829"}, "cover note": "Please accept my apologies that this pack was put together in a rush. Kind regards, Emily Wolmow", "documents received": ["Prerequisite certificate for course booking BH-46231. Date of issue: 28 August 2026. 1 page.", "Payment confirmation for course booking BH-46231. Date of issue: 13 August 2026. 1 page.", "Employer sponsorship letter for course booking BH-46231. Date of issue: 4 September 2026. 1 page. Signed by the employer.", "Cancellation policy acceptance for course booking BH-46231. Date of issue: 11 August 2026. 1 page. Signed by the delegate.", "Course booking form for course booking BH-46231. Date of issue: 30 June 2026. 2 pages, complete. Signed by the delegate.", "Special requirements note for course booking BH-46231. Date of issue: 28 June 2026. 1 page.", "Delegate photo identification for course booking BH-46231. Expiry date: 12 June 2028. 1 page.", "Venue access instructions for course booking BH-46231. Date of issue: 27 July 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 831}} {"id": "isc-te-00385-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Cindlund SAS", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "14 May 2026"}, "checklist": ["Flexible working request form, signed", "Trial period proposal, signed", "Line manager opinion note, signed, issued within the last 2 months", "Proposed working pattern plan, signed", "Impact assessment on the team, signed"], "submission": {"case": {"name": "Michael Pimisey", "reference": "TK-36304"}, "documents received": ["Line manager opinion note for Michael Pimisey, dated 10 May 2026, 2 pages, complete, signed by the line manager.", "Impact assessment on the team for Michael Pimisey, dated 1 February 2026, 3 pages, complete, signed by the line manager.", "Proposed working pattern plan for Michael Pimisey, dated 27 March 2026, 2 pages, complete, signed by the employee.", "Flexible working request form for Michael Pimisey, dated 22 April 2026, 3 pages, complete, signed by the employee.", "Previous flexible working requests record for Michael Pimisey, dated 2 March 2026, 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 663}} {"id": "isc-te-00260-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Baxcrest SAS", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "1 May 2026"}, "checklist": ["Alternatives considered table", "Cost estimate sheet, issued within the last 6 months", "Capacity and load estimate, issued within the last 6 months", "Migration and rollout plan", "Proposed architecture diagram"], "submission": {"case": {"name": "design document UZ-54491", "reference": "GO-74704"}, "documents received": ["uz54491_migration_and_rollout_plan.pdf - Migration and rollout plan for design document UZ-54491. Date of issue: 12 March 2026. 3 pages, complete.", "uz54491_proposed_architecture_diagram.pdf - Proposed architecture diagram for design document UZ-54491. Date of issue: 2 February 2026. Single page.", "uz54491_problem_statement_page.pdf - Problem statement page for design document UZ-54491. Date of issue: 8 April 2026. 2 pages, complete.", "uz54491_capacity_and_load_estimate.pdf - Capacity and load estimate for design document UZ-54491. Date of issue: 20 December 2025. 3 pages, complete.", "uz54491_review_board_feedback_summary.pdf - Review board feedback summary for design document UZ-54491. Date of issue: 2 April 2026. 2 pages, complete. Signed by the architecture review board chair.", "uz54491_cost_estimate_sheet.pdf - Cost estimate sheet for design document UZ-54491. Date of issue: 13 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00046-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Zaldhurst Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "1 June 2026"}, "checklist": ["Financial stability statement, issued within the last 12 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed.", "Supplier self-assessment report, issued within the last 12 months and signed.", "Certified quality management system certificate, valid (not expired) on the date of the review.", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months and signed."], "submission": {"case": {"name": "Eskvale plc", "reference": "VY-19567", "details": ["The supplier subcontracts part of the production."]}, "cover note": "I would be grateful for a quick approval on this one, as everything is in order.", "documents received": ["Eskvale_plc_financial_stability_statement_23March2026.pdf — Financial stability statement for Eskvale plc, dated 23 March 2026. 2 pages, complete. Signed by the finance director of Eskvale plc.", "Eskvale_plc_raw_material_certificate_of_analysis_12January2026.pdf — Raw material certificate of analysis for Eskvale plc, dated 12 January 2026. 2 pages, complete. Signed by the laboratory manager of Eskvale plc.", "Eskvale_plc_subcontractor_approval_record_7October2025.pdf — Subcontractor approval record for Eskvale plc, dated 7 October 2025. 2 pages, complete. Signed by the purchasing manager of Eskvale plc.", "Eskvale_plc_supplier_quality_questionnaire_13April2026.pdf — Supplier quality questionnaire for Eskvale plc, dated 13 April 2026. 4 pages, complete. Signed by the quality manager of Eskvale plc.", "Thalstow_GmbH_supplier_self_assessment_report_14May2026.pdf — Supplier self-assessment report for Thalstow GmbH, dated 14 May 2026. 6 pages, complete. Signed by the quality manager of Thalstow GmbH.", "Eskvale_plc_supplier_capacity_declaration_20June2025.pdf — Supplier capacity declaration for Eskvale plc, dated 20 June 2025. 2 pages, complete. Signed by the operations director of Eskvale plc.", "Eskvale_plc_certified_QMS_certificate_29October2027.pdf — Certified quality management system certificate for Eskvale plc, showing an expiry date of 29 October 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 975}} {"id": "isc-te-00304-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Stervgard Ltd", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "20 March 2026"}, "checklist": ["Check that the engineer's fault diagnosis report is included, that it was issued within the last 3 months, and that it is signed.", "If the breakdown spoiled perishable stock, also check that the spoiled stock disposal certificate is included, that it was issued within the last 3 months, and that it is signed.", "Check that the policy machinery schedule is included.", "Check that the production downtime log is included, that it was issued within the last 3 months, and that it is signed.", "Check that photographs of the failed component are included.", "Check that the purchase invoice for the machine is included."], "submission": {"case": {"name": "failed machine VU-78923", "reference": "UW-19124"}, "cover note": "I am sorry that this pack was put together in a rush, and I would be grateful for your understanding while you review it.", "documents received": ["spoiled_stock_disposal_certificate_VU-78923.pdf. This spoiled stock disposal certificate covers failed machine VU-78923 and is dated 5 February 2026. It has 2 pages, complete, and is signed by the disposal contractor.", "photographs_failed_component_VU-78923.pdf. This set of photographs of the failed component relates to failed machine VU-78923 and is dated 14 March 2026. It has 2 pages, complete.", "policy_machinery_schedule_VU-78923.pdf. This policy machinery schedule covers failed machine VU-78923 and is dated 26 November 2025. It has 3 pages, complete.", "production_downtime_log_VU-78923.pdf. This production downtime log covers failed machine VU-78923 and is dated 18 February 2026. It has 2 pages, complete, and is signed by the production supervisor.", "engineer_fault_diagnosis_report_VU-78923.pdf. This engineer's fault diagnosis report covers failed machine VU-78923 and is dated 14 January 2026. It has 4 pages, complete, and is signed by the attending engineer.", "purchase_invoice_machine_VU-78923.pdf. This purchase invoice for the machine relates to failed machine VU-78923 and is dated 26 January 2026. It is a single page.", "equipment_breakdown_claim_form_VU-78923.pdf. This equipment breakdown claim form covers failed machine VU-78923 and is dated 12 December 2025. It has 3 pages, complete, and is signed by the policyholder's representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1018}} {"id": "isc-te-00284-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Vaskridge plc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "7 May 2026"}, "checklist": ["Company tax registration certificate on file.", "Beneficial owner identification form on file, signed.", "Company statutes on file, signed.", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents.", "Proof of registered office address on file, issued within the last 3 months.", "Shareholder register extract on file, issued within the last 3 months."], "submission": {"case": {"name": "Wendshaw Limited", "reference": "ZW-66539"}, "documents received": ["tax-reg-cert_wendshaw.pdf - Company tax registration certificate for Wendshaw Limited. Date of issue: 23 January 2026. 1 page.", "registered-office-proof_wendshaw.pdf - Proof of registered office address for Wendshaw Limited. Date of issue: 25 March 2026. 1 page.", "apostilled-incorporation-docs_wendshaw.pdf - Apostilled incorporation documents for Wendshaw Limited. Date of issue: 24 April 2026. 4 pages, complete.", "company-statutes_wendshaw.pdf - Company statutes for Wendshaw Limited. Date of issue: 10 April 2026. 12 pages, complete. Signed by the company secretary.", "bo-identification-form_wendshaw.pdf - Beneficial owner identification form for Wendshaw Limited. Date of issue: 19 March 2026. 3 pages, complete. Signed by the beneficial owner.", "board-resolution_wendshaw.pdf - Board resolution to open the account for Wendshaw Limited. Date of issue: 26 April 2026. 1 page. Signed by the directors.", "shareholder-register_wendshaw.pdf - Shareholder register extract for Wendshaw Limited. Date of issue: 14 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 812}} {"id": "isc-te-00160-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Vaskfell Group", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "17 July 2026"}, "checklist": ["Equipment purchase request form, signed", "Three quotes comparison sheet, issued within the last 3 months, signed", "Grant fund eligibility note, issued within the last 6 months, signed", "Training needs assessment, signed", "Vendor quotation, issued within the last 3 months", "If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review"], "submission": {"case": {"name": "equipment YS-3896", "reference": "VL-69788", "details": ["The equipment uses radioactive sources."]}, "documents received": ["Grant fund eligibility note YS-3896.pdf — Grant fund eligibility note for equipment YS-3896, dated 21 March 2026, one page. Signed by the grants officer.", "Equipment purchase request form YS-3896.pdf — Equipment purchase request form for equipment YS-3896, dated 30 April 2026. 2 pages, complete. Signed by the requesting department head.", "Radiation licence YS-3896.pdf — Radiation licence for equipment YS-3896, expiring 21 March 2028, one page.", "Vendor quotation YS-3896.pdf — Vendor quotation for equipment YS-3896, dated 27 May 2026. 2 pages, complete.", "Training needs assessment YS-3896.pdf — Training needs assessment for equipment YS-3896, dated 24 April 2026, one page. Signed by the training coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 773}} {"id": "isc-te-00045-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Teskmouth BV", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "24 June 2026"}, "checklist": ["If the supplier subcontracts part of the production, also: subcontractor approval record (issued within the last 12 months, signed)", "Raw material certificate of analysis (issued within the last 6 months, signed)", "Financial stability statement (issued within the last 12 months, signed)", "Supplier self-assessment report (issued within the last 12 months, signed)", "Certified quality management system certificate (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Orrwood Ltd", "reference": "EW-86026", "details": ["The supplier carries out all production in-house."]}, "documents received": ["Supplier self-assessment report for Orrwood Ltd, dated 7 September 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Raw material certificate of analysis for Orrwood Ltd, dated 9 February 2026. 2 pages, complete. Signed by the supplier's quality manager.", "Certified quality management system certificate for Orrwood Ltd, with an expiry date of 7 September 2026. Single page.", "Supplier audit report for Orrwood Ltd, dated 13 December 2024. 8 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 695}} {"id": "isc-te-00490-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravness Group", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "14 July 2026"}, "checklist": ["Fire safety certificate: valid (not expired) on the date of the review", "Floor load capacity report: signed", "Utilities connection certificate", "Signed lease agreement: signed"], "submission": {"case": {"name": "warehouse MI-17904", "reference": "DQ-47245"}, "documents received": ["floor_load_capacity_report_MI-17904.pdf — Floor load capacity report for warehouse MI-17904. Date of issue: 18 April 2026. 3 pages, complete. Signed by the structural engineer.", "utilities_connection_certificate_MI-17904.pdf — Utilities connection certificate for warehouse MI-17904. Date of issue: 2 May 2026. Single page.", "signed_lease_agreement_MI-17904.pdf — Signed lease agreement for warehouse MI-17904. Date of issue: 14 June 2026. 8 pages, complete. Signed by the landlord and the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 642}} {"id": "isc-te-00224-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Uldvale plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "9 June 2026"}, "checklist": ["If the customer requests a credit limit above the standard cap, also: finance director sanction letter (issued within the last 1 months, signed)", "Trade references letter (issued within the last 3 months, signed)", "Credit reference agency report (issued within the last 3 months)", "Personal guarantee (signed)", "Bank reference letter (issued within the last 6 months, signed)", "Signed credit terms agreement (signed)", "Company registration certificate"], "submission": {"case": {"name": "Holthorpe Limited", "reference": "ES-61445"}, "cover note": "Please could you approve this as quickly as possible, as all the paperwork is in order. Happy to answer any questions in the meantime. Simon Halell", "documents received": ["Credit limit approval memo - Holthorpe Limited.pdf - Credit limit approval memo about Holthorpe Limited, dated 27 May 2026. It is 1 page. It is signed by the credit control manager.", "Bank reference letter - Holthorpe Limited.pdf - Bank reference letter about Holthorpe Limited, dated 14 March 2026. It is 1 page. It is signed by the bank manager.", "Credit reference agency report - Holthorpe Limited.pdf - Credit reference agency report about Holthorpe Limited, dated 26 May 2026. It is 6 pages, complete.", "Personal guarantee - Holthorpe Limited.pdf - Personal guarantee about Holthorpe Limited, dated 20 February 2026. It is 2 pages, complete. It is signed by the guarantor.", "Trade references letter - Holthorpe Limited.pdf - Trade references letter about Holthorpe Limited, dated 3 April 2026. It is 1 page. It is signed by a director of the referee company.", "Signed credit terms agreement - Holthorpe Limited.pdf - Signed credit terms agreement about Holthorpe Limited, dated 31 March 2026. It is 4 pages, complete. It is signed by a director of Holthorpe Limited.", "Company registration certificate - Holthorpe Limited.pdf - Company registration certificate about Holthorpe Limited, dated 2 April 2026. It is 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 909}} {"id": "isc-te-00233-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Oxlfield SAS", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "6 March 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "Account request form, signed", "Content escalation route, signed", "Naming convention approval, signed"], "submission": {"case": {"name": "new social media account WD-87625", "reference": "WM-51560"}, "documents received": ["Account request form WD-87625.pdf. This single-page account request form for new social media account WD-87625 shows its date of issue as 10 December 2025 and carries the signature of the marketing team lead.", "Content escalation route WD-87625.pdf. This single-page content escalation route for new social media account WD-87625 shows its date of issue as 15 November 2025 and carries the signature of the marketing team lead.", "Platform terms acceptance record WD-87625.pdf. This single-page platform terms acceptance record for new social media account WD-87625 shows its date of issue as 22 November 2025 and carries the signature of the digital operations manager.", "Admin access list WD-87625.pdf. This single-page admin access list for new social media account WD-87625 shows its date of issue as 31 December 2025.", "Naming convention approval WD-87625.pdf. This single-page naming convention approval for new social media account WD-87625 shows its date of issue as 6 February 2026 and carries the signature of the brand governance manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete relative to the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-35", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 762}} {"id": "isc-te-00472-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lombcliff Partners", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "3 August 2026"}, "checklist": ["Risk assessment for the task, issued within the last 3 months and signed.", "Cost estimate, issued within the last 3 months and signed.", "If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Access authorisation slip, signed.", "Photographs of the fault, issued within the last 3 months.", "Parts order confirmation, issued within the last 1 months."], "submission": {"case": {"name": "maintenance request XO-61833", "reference": "IR-85731", "details": ["The job involves no work at height above two metres."]}, "documents received": ["Access authorisation slip for maintenance request XO-61833, dated 6 July 2026. Single page. Signed by the access controller.", "Photographs of the fault for maintenance request XO-61833, dated 19 July 2026. 2 pages, complete.", "Job request form for maintenance request XO-61833, dated 16 July 2026. Single page. Signed by the requesting manager.", "Cost estimate for maintenance request XO-61833, dated 1 June 2026. 2 pages, complete. Signed by the estimating officer.", "Risk assessment for the task on maintenance request XO-61833, dated 4 June 2026. 5 pages, complete. Signed by the assessing supervisor.", "Parts order confirmation for maintenance request XO-61833, dated 23 September 2025. Single page."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Output complete if every applicable line is met (extra documents do not matter). Output incomplete if at least one applicable line is not met. Output unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so base your judgement on the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-31", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00173-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Belmhall Ltd", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "20 August 2026"}, "checklist": ["Check that the pack contains an incident timeline issued no more than 3 months ago.", "Check that the pack contains postmortem meeting minutes issued no more than 3 months ago and signed.", "Check that the pack contains a root cause analysis report issued no more than 3 months ago and signed.", "Check that the pack contains an alerting rules review note issued no more than 3 months ago."], "submission": {"case": {"name": "production incident FN-18440", "reference": "PK-62381"}, "documents received": ["Alerting rules review note for production incident FN-18440, date of issue 14 July 2026. 2 pages, complete.", "Follow-up owner assignment sheet for production incident FN-18440, date of issue 1 June 2026. Single page. Signed by the incident manager.", "Postmortem meeting minutes for production incident FN-18440, date of issue 10 August 2026. 3 pages, complete. Signed by the meeting chair.", "Incident timeline for production incident FN-18440, date of issue 13 August 2026. 3 pages, complete.", "Root cause analysis report for production incident FN-18440, date of issue 29 June 2026. 5 pages, complete. Signed by the lead reliability engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 730}} {"id": "isc-te-00426-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Corvfell plc", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "9 April 2026"}, "checklist": ["Confirm the pack contains a medical examination certificate issued within the last 6 months and signed.", "Confirm the pack contains a photo driving licence that is valid, not expired, on the date of the review.", "Confirm the pack contains a right to work share code printout issued within the last 3 months.", "Confirm the pack contains a passport style photograph issued within the last 6 months.", "Confirm the pack contains a knowledge test pass certificate.", "If the applicant has lived at an address outside the country in the last five years, also confirm the pack contains a criminal record certificate from overseas issued within the last 3 months."], "submission": {"case": {"name": "Emily Lamova", "reference": "XZ-10465", "details": ["The applicant has lived at the same address in the country for the last five years."]}, "documents received": ["Provisional driving licence with no full entitlement shown for Emily Lamova, showing an expiry date of 16 December 2027. 2 pages, complete.", "Licence application form for Emily Lamova, dated 27 December 2025. 6 pages, complete. Signed by the applicant.", "Knowledge test pass certificate for Emily Lamova, dated 29 January 2026. Single page.", "Right to work share code printout for Emily Lamova, dated 21 February 2026. Single page.", "Medical examination certificate for Emily Lamova, dated 21 November 2025. 2 pages, complete. Signed by a doctor.", "Passport style photograph of Emily Lamova, dated 4 January 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 771}} {"id": "isc-te-00343-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Ebrton & Co", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "17 March 2026"}, "checklist": ["Check that the radiation safety training certificate is included, that it was issued within the last 24 months and that it is signed.", "Check that the insurance declaration for facility work is included, that it was issued within the last 12 months and that it is signed.", "Check that the photo identity document is included and that it is valid, meaning not expired, on the date of the review.", "Check that the beam time or instrument booking confirmation is included.", "Check that the experiment safety clearance form is included and that it is signed."], "submission": {"case": {"name": "Elif Aldmore", "reference": "NP-73151"}, "documents received": ["d6_home_institution_endorsement_letter_elif_aldmore.pdf. Home institution endorsement letter for Elif Aldmore, issued on 8 February 2026. It is a single page and is signed by the home institution's head of department.", "d7_host_scientist_invitation_letter_elif_aldmore.pdf. Host scientist invitation letter for Elif Aldmore, issued on 18 January 2026. It is a single page and is signed by the host scientist.", "d3_photo_identity_document_elif_aldmore.pdf. Photo identity document for Elif Aldmore, with an expiry date of 10 February 2028. It is a single page.", "d2_insurance_declaration_facility_work_elif_aldmore.pdf. Insurance declaration for facility work for Elif Aldmore, issued on 18 December 2025. It is a single page and is signed by the insurance provider's authorised representative.", "d5_experiment_safety_clearance_form_elif_aldmore.pdf. Experiment safety clearance form for Elif Aldmore, issued on 15 January 2026. All 3 pages are included, but the signature block on the last page is covered by a sticky note, so it is not known whether the form is signed.", "d1_radiation_safety_training_certificate_elif_aldmore.pdf. Radiation safety training certificate for Elif Aldmore, issued on 7 April 2024. It is a single page and is signed by the radiation safety training officer.", "d4_beam_time_booking_confirmation_elif_aldmore.pdf. Beam time or instrument booking confirmation for Elif Aldmore, issued on 23 December 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 938}} {"id": "isc-te-00364-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Corvfeld plc", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "8 July 2026"}, "checklist": ["Data migration confirmation, issued within the last 3 months, signed.", "Dependent systems check report, issued within the last 3 months.", "Asset register update, issued within the last 1 month.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed.", "Licence reassignment note, issued within the last 3 months, signed.", "Data wipe certificate, issued within the last 3 months, signed.", "Decommission request form, signed."], "submission": {"case": {"name": "retired server IS-34675", "reference": "HO-82305"}, "documents received": ["Data migration confirmation for retired server IS-34675, dated 27 May 2026. 2 pages, complete. Signed by the operations lead.", "Dependent systems check report for retired server IS-34675, dated 2 July 2026. 3 pages, complete.", "Data wipe certificate for retired server IS-34675, dated 26 May 2026. Single page. Signed by the engineer who carried out the wipe.", "Asset register update for retired server IS-34675, dated 2 July 2026. Single page.", "Final backup confirmation for retired server IS-34675, dated 5 May 2026. Single page. Signed by the backup administrator.", "Licence reassignment note for retired server IS-34675, dated 4 May 2026. Single page. Signed by the operations lead.", "Decommission request form for retired server IS-34675, dated 17 March 2026. 2 pages, complete. Signed by the requesting team manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 817}} {"id": "isc-te-00051-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Pelllund plc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "15 September 2026"}, "checklist": ["Check that the kit contents list is in the pack.", "Check that the store installation guide is in the pack.", "If the kit includes an electrical display unit, also check that an electrical safety test certificate issued within the last 12 months is in the pack.", "Check that a signed point of sale design proof is in the pack.", "Check that a kit cost breakdown issued within the last 3 months and signed is in the pack."], "submission": {"case": {"name": "merchandising kit JJ-94285", "reference": "ZH-89674", "details": ["The kit includes no electrical display unit."]}, "documents received": ["Store_installation_guide_JJ-94285.pdf. This is the store installation guide for merchandising kit JJ-94285, dated 9 September 2026. 6 pages, complete.", "Kit_contents_list_JJ-94285.pdf. This is the kit contents list for merchandising kit JJ-94285, dated 12 June 2026. 2 pages, complete.", "Point_of_sale_design_proof_JJ-94285.pdf. This is the point of sale design proof for merchandising kit JJ-94285, dated 17 August 2026. 4 pages, complete. It is signed by the design studio manager.", "Kit_cost_breakdown_JJ-94285.pdf. This is the kit cost breakdown for merchandising kit JJ-94285, dated 11 July 2026. 2 pages, complete. It is signed by the retail marketing manager.", "Brand_colour_specification_JJ-94285.pdf. This is the brand colour specification for merchandising kit JJ-94285, dated 2 June 2026. Single page.", "Napkin_sketch_JJ-94285.pdf. This is a rough sketch on a napkin about merchandising kit JJ-94285, dated 17 August 2026. 4 pages, complete. It is signed by the designer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 895}} {"id": "isc-te-00035-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Elvshaw Inc", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "1 September 2026"}, "checklist": ["Fit-out cost estimate, issued within the last 6 months and signed", "Pilot operation audit report, issued within the last 6 months and signed", "Franchise application form, signed", "Franchise disclosure document receipt, issued within the last 3 months and signed"], "submission": {"case": {"name": "Eskmouth GmbH", "reference": "WJ-35437"}, "documents received": ["Eskmouth_GmbH_franchise_disclosure_document_receipt.pdf — Franchise disclosure document receipt for Eskmouth GmbH, dated 2 August 2026. 1 page. Signed by the managing director of Eskmouth GmbH.", "Eskmouth_GmbH_franchise_agreement_counterpart.pdf — Signed franchise agreement counterpart for Eskmouth GmbH, dated 14 July 2026. 12 pages, complete. Signed by the franchisor's legal counsel and the managing director of Eskmouth GmbH.", "Eskmouth_GmbH_fit-out_cost_estimate.pdf — Fit-out cost estimate for Eskmouth GmbH, dated 15 May 2026. 4 pages, complete. Signed by the franchisor's head of construction.", "Eskmouth_GmbH_franchise_application_form.pdf — Franchise application form for Eskmouth GmbH, dated 18 June 2026. 3 pages, complete. Signed by the managing director of Eskmouth GmbH."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-72", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 719}} {"id": "isc-te-00291-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Aldwick Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "14 July 2026"}, "checklist": ["Check for the thermostat calibration certificate, issued within the last 12 months.", "Check for the plant room access sign-in sheet.", "Check for the refrigerant top-up log, issued within the last 1 months and signed.", "Check for the asset condition photograph sheet, issued within the last 1 months.", "Check for the engineer's service report, issued within the last 1 months and signed.", "If the system contains more than 5 tonnes of refrigerant, also check for the fixed leak detection test certificate, issued within the last 6 months and signed."], "submission": {"case": {"name": "air conditioning system SL-89503", "reference": "NG-66391", "details": ["The system contains more than 5 tonnes of refrigerant."]}, "documents received": ["Old refrigerant log 2025 SL-89503.pdf: A single-page old refrigerant log from a previous year for air conditioning system SL-89503, dated 25 June 2026, signed by the site technician.", "Asset condition photograph sheet SL-89503.pdf: An asset condition photograph sheet for air conditioning system SL-89503, dated 30 June 2026; 2 pages, complete.", "Thermostat calibration certificate SL-89503.pdf: A single-page thermostat calibration certificate for air conditioning system SL-89503, dated 4 November 2025.", "Engineer's service report SL-89503.pdf: An engineer's service report for air conditioning system SL-89503, dated 25 June 2026; 3 pages, complete, signed by the service engineer.", "Fixed leak detection test certificate SL-89503.pdf: A fixed leak detection test certificate for air conditioning system SL-89503, dated 16 February 2026; 2 pages, complete, signed by the leak detection engineer.", "System pressure test results SL-89503.pdf: System pressure test results for air conditioning system SL-89503, dated 8 July 2026; 2 pages, complete, signed by the service engineer.", "Plant room access sign-in sheet SL-89503.pdf: A single-page plant room access sign-in sheet for air conditioning system SL-89503, dated 25 June 2026."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; base your judgement on the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-42", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 962}} {"id": "isc-te-00477-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Faldcourt BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "26 June 2026"}, "checklist": ["Previous grievance outcome letter issued within the last 24 months.", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed.", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed.", "Witness list, signed.", "Grievance procedure acknowledgement issued within the last 3 months, signed.", "Adjustment request record issued within the last 3 months, signed.", "Written grievance statement, signed."], "submission": {"case": {"name": "Chloe Clemby", "reference": "EW-81989", "details": ["The grievance is against the employee's direct manager.", "The grievance alleges bullying by a named colleague."]}, "cover note": "Everything is in order, so a quick approval would be much appreciated.", "documents received": ["Alternative manager reporting line note, Chloe Clemby, issued 5 June 2026, single page. Signed by the employee relations manager.", "Adjustment request record, Chloe Clemby, issued 16 February 2026, single page. Signed by the occupational health adviser.", "Grievance procedure acknowledgement, Chloe Clemby, issued 16 May 2026, single page. Signed by Chloe Clemby.", "Evidence bundle index, Chloe Clemby, issued 8 May 2026. 2 pages, complete. Signed by the case handler.", "Written grievance statement, Chloe Clemby, issued 19 April 2026. 3 pages, complete. Signed by Chloe Clemby.", "Bullying allegation evidence log, Chloe Clemby, issued 19 May 2026. 3 pages, complete. Signed by the employee relations manager.", "Previous grievance outcome letter, Chloe Clemby, issued 8 July 2025. 2 pages, complete.", "Witness list, Chloe Clemby, issued 21 April 2026, single page. Signed by the case handler."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 850}} {"id": "isc-te-00302-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Yondmouth plc", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "1 April 2026"}, "checklist": ["Check the pack contains the policy machinery schedule.", "Check the pack contains the machine maintenance log, issued within the last 6 months.", "If a temporary machine was hired to keep production going, also: check the pack contains the temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Check the pack contains the photographs of the failed component.", "Check the pack contains the purchase invoice for the machine.", "Check the pack contains the repair or replacement quotation, issued within the last 3 months."], "submission": {"case": {"name": "failed machine ZE-69152", "reference": "EP-56568", "details": ["No temporary machine was hired to keep production going."]}, "cover note": "All the paperwork is in order, so a quick approval would be much appreciated.", "documents received": ["Policy machinery schedule for machine ZE-69152. Date of issue: 11 March 2026. 3 pages, complete.", "Photographs of the failed component for machine ZE-69152. Date of issue: 24 March 2026. 2 pages, complete.", "Repair or replacement quotation for machine ZE-69152. Date of issue: 21 April 2025. 2 pages, complete.", "Purchase invoice for the machine for machine ZE-69152. Date of issue: 14 December 2025. Single page.", "Machine maintenance log for machine ZE-69152. Date of issue: 30 March 2026. 5 pages, complete.", "Equipment breakdown claim form for machine ZE-69152. Date of issue: 30 January 2026. 3 pages, complete. Signed by the policyholder's operations director."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Go through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-49", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 820}} {"id": "isc-te-00480-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Zervshaw Inc", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "29 June 2026"}, "checklist": ["Photographs of flood water in the rooms, issued within the last 1 months", "Flood claim form, signed", "Loss adjuster's inspection report, issued within the last 6 months and signed", "Council flood warning notice, issued within the last 12 months", "If the property is a listed building, also: listed building consent for the repairs, signed", "Debris removal invoice, issued within the last 6 months"], "submission": {"case": {"name": "property TS-49863", "reference": "IK-32131", "details": ["The property is a listed building."]}, "documents received": ["Council flood warning notice for property TS-49863, dated 16 August 2025. 1 page.", "Photographs of flood water in the rooms relating to property TS-49863, dated 26 June 2026. 3 pages, complete.", "Listed building consent for the repairs at property TS-49863, dated 2 June 2026. 2 pages, complete. Signed by the council planning officer.", "Loss adjuster's inspection report for property TS-49863, dated 10 April 2026. 6 pages, complete. Signed by the loss adjuster.", "Debris removal invoice for property TS-49863, dated 15 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 738}} {"id": "isc-te-00247-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Faldmont GmbH", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "27 April 2026"}, "checklist": ["Rent book or rent payment schedule issued within the last 2 months.", "Benefit claim form that is valid, not expired, on the date of the review, signed.", "Current tenancy agreement, signed.", "Proof of identity that is valid, not expired, on the date of the review."], "submission": {"case": {"name": "Simon Holtani", "reference": "HP-46378"}, "documents received": ["Current tenancy agreement. The agreement is about Simon Holtani and shows its date of issue as 27 March 2026. 12 pages, complete. It is signed by the landlord.", "Benefit claim form. The form is about Simon Holtani and shows its expiry date as 11 May 2026. 12 pages, complete. It is signed by the claimant.", "Proof of identity. The document is about Simon Holtani and shows its expiry date as 4 July 2027. It is a single page.", "Rent book or rent payment schedule. The document is about Simon Holtani and shows its date of issue as 4 April 2026. 4 pages, complete.", "Recent bank statements. The statements are about Simon Holtani and show their date of issue as 8 April 2026. 12 pages, complete."]}}, "question": {"type": "choice", "instructions": "The question to answer is whether the pack stands complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-63", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 706}} {"id": "isc-te-00354-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Urvwood Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "1 May 2026"}, "checklist": ["If the design changes how customer data is stored, also include: data protection review sign-off (signed)", "Include: proposed architecture diagram", "Include: security threat model (issued within the last 6 months)", "Include: capacity and load estimate (issued within the last 6 months)", "Include: review board feedback summary (issued within the last 3 months, signed)", "Include: problem statement page", "Include: migration and rollout plan"], "submission": {"case": {"name": "design document DI-65969", "reference": "WL-84298", "details": ["The design does not change how customer data is stored."]}, "documents received": ["A proposed architecture diagram for design document DI-65969, dated 8 April 2026. Single page.", "An alternatives considered table for design document DI-65969, dated 18 April 2026. 2 pages, complete.", "A problem statement page for design document DI-65969, dated 13 March 2026. 2 pages, complete.", "A cost estimate sheet for design document DI-65969, dated 11 April 2026. 2 pages, complete.", "A migration and rollout plan for design document DI-65969, dated 20 February 2026. 3 pages, complete.", "A security threat model for design document DI-65969, dated 18 January 2026. 4 pages, complete.", "A capacity and load estimate for design document DI-65969, dated 18 February 2026. 3 pages, complete.", "A review board feedback summary for design document DI-65969, dated 1 March 2026. 2 pages, complete. Signed by the review board chair."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist: is it complete? Work through each line of the checklist that applies to this case. A required document only counts when it is the kind of document listed (not a similar one), concerns the subject of the case, has all its pages, is signed wherever the checklist requires a signature, had not expired on the date of the review, and was issued inside the period the checklist allows. A conditional line applies only if its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-44", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 837}} {"id": "isc-te-00464-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Quelfell Ltd", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "15 April 2026"}, "checklist": ["If the property is being bought from a family member, also: independent purchase price assessment (issued within the last 3 months, signed)", "Mortgage application form (signed)", "Photo identity document (valid (not expired) on the date of the review)", "Property valuation report (issued within the last 6 months, signed)", "Employment certificate (issued within the last 1 months, signed)", "Sale and purchase agreement (signed)", "Proof of deposit (issued within the last 3 months)"], "submission": {"case": {"name": "property FN-50742", "reference": "TZ-90153", "details": ["The property is being bought from a family member."]}, "documents received": ["TZ-90153 Independent purchase price assessment.pdf — Independent purchase price assessment for property FN-50742. Date of issue: 28 January 2026. 2 pages, complete. Signed by the assessor.", "TZ-90153 Property valuation report.pdf — Property valuation report for property FN-50742. Date of issue: 24 March 2026. 10 pages, complete. Signed by the valuer.", "TZ-90153 Bank statement.pdf — Bank statement relating to property FN-50742. Date of issue: 2 March 2026. 3 pages, complete.", "TZ-90153 Mortgage application form.pdf — Mortgage application form for property FN-50742. Date of issue: 25 January 2026. 6 pages, complete. Signed by the applicant.", "TZ-90153 Proof of deposit.pdf — Proof of deposit relating to property FN-50742. Date of issue: 2 March 2026. Single page.", "TZ-90153 Sale and purchase agreement.pdf — Sale and purchase agreement for property FN-50742. Date of issue: 26 December 2025. 9 pages, complete. Signed by the buyer and the seller.", "TZ-90153 Photo identity document.pdf — Photo identity document relating to property FN-50742. Expiry date: 29 April 2028. Single page.", "TZ-90153 Employment certificate.pdf — Employment certificate relating to property FN-50742. Date of issue: 30 March 2026. Single page. Signed by the employer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 965}} {"id": "isc-te-00330-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Marlmoor GmbH", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "17 April 2026"}, "checklist": ["Line manager approval, signed", "If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Visa entry requirement printout, issued within the last 3 months", "Flight itinerary quote, issued within the last 1 months", "Travel request form, signed", "If the trip involves travel to a country requiring a visa, also: visa approval letter", "Hotel booking confirmation"], "submission": {"case": {"name": "business trip LT-79663", "reference": "RA-34404", "details": ["The traveller holds a passport of the destination country.", "The trip involves travel to a country requiring a visa."]}, "documents received": ["travel request form LT-79663. It is a travel request form for business trip LT-79663, dated 21 March 2026. 2 pages, complete. It is signed by the traveller.", "hotel booking confirmation LT-79663. It is a hotel booking confirmation for business trip LT-79663, dated 25 January 2026. 2 pages, complete.", "visa approval letter LT-79663. It is a visa approval letter for business trip LT-79663, dated 28 March 2026. 2 pages, complete.", "visa entry requirement printout LT-79663. It is a visa entry requirement printout for business trip LT-79663, dated 8 February 2026. 2 pages, complete.", "line manager approval LT-79663. It is a single-page line manager approval for business trip LT-79663, dated 10 March 2026, and it is signed by the traveller's line manager.", "flight itinerary quote LT-79663. It is a flight itinerary quote for business trip LT-79663, dated 31 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 860}} {"id": "isc-te-00379-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Eskhall SAS", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "8 July 2026"}, "checklist": ["If the seller intends to list food or cosmetic products, also include: safety compliance certificate (issued within the last 12 months)", "Include: proof of trading address (issued within the last 3 months)", "Include: tax registration letter", "Include: bank account verification letter (issued within the last 3 months, signed)", "Include: anti-money laundering questionnaire (signed)", "Include: business registration certificate", "Include: authorised representative ID copy (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Hondhall plc", "reference": "TW-57851", "details": ["The seller intends to list food or cosmetic products."]}, "documents received": ["Tax registration letter – Hondhall plc. Date of issue: 12 May 2026. 1 page.", "Bank account verification letter – Hondhall plc. Date of issue: 17 May 2026. 1 page. Signed by the bank's account manager.", "Proof of trading address – Hondhall plc. Date of issue: 30 May 2026. 1 page.", "Authorised representative ID copy – Hondhall plc. Expiry date: 18 December 2028. 1 page.", "Returns policy statement – Hondhall plc. Date of issue: 12 March 2026. 2 pages, complete. Signed by the company's authorised representative.", "Anti-money laundering questionnaire – Hondhall plc. Date of issue: 23 March 2026. 3 pages, complete. Signed by the company's compliance officer.", "Business registration certificate – Hondhall plc. Date of issue: 28 April 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 793}} {"id": "isc-te-00397-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Ovarheim plc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "6 August 2026"}, "checklist": ["Energy performance certificate, valid (not expired) on the date of the review.", "Title information document.", "If the tenant is a newly formed company, also: signed parent company guarantee (signed).", "Keys handover receipt (signed).", "Asbestos survey report (issued within the last 12 months).", "Signed draft lease (signed).", "If the lease term is longer than seven years, also: land registration application (signed)."], "submission": {"case": {"name": "premises SZ-39951", "reference": "XS-67082", "details": ["Thetestant is an established company.", "The lease term is seven years or less."]}, "documents received": ["Asbestos survey report for premises SZ-39951. It shows a date of issue of 27 December 2025. 4 pages, complete.", "Signed draft lease for premises SZ-39951. It shows a date of issue of 30 May 2026 and is signed by the landlord and the tenant. 12 pages, complete.", "Keys handover receipt for premises SZ-39951. It shows a date of issue of 5 July 2026 and is signed by the landlord's agent. Single page.", "Energy performance certificate for premises SZ-39951. It shows an expiry date of 19 August 2026. Single page.", "Title information document for premises SZ-39951. It shows a date of issue of 8 July 2026. 3 pages, complete.", "Energy performance certificate for premises SZ-39951. It shows an expiry date of 29 June 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00271-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Ilvhurst SAS", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "23 March 2026"}, "checklist": ["Leaver notification form, signed", "Non-disclosure reminder acknowledgement, signed", "Final payroll cut-off note, signed, issued within the last 1 months", "Service desk ticket closure summary, issued within the last 1 months"], "submission": {"case": {"name": "Declan Vellridge", "reference": "QT-58639"}, "cover note": "Everything needed is attached and complete, so the pack is ready for your approval.", "documents received": ["File scan_008.pdf: the file will not open, so its contents cannot be seen.", "Service desk ticket closure summary for Declan Vellridge, issued 9 March 2026. 3 pages, complete.", "Line manager confirmation for Declan Vellridge, issued 20 March 2026. Single page. Signed by the line manager.", "Leaver notification form for Declan Vellridge, issued 30 November 2025. 2 pages, complete. Signed by the line manager.", "Non-disclosure reminder acknowledgement for Declan Vellridge, issued 5 March 2026. Single page. Signed by the departing employee."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Go through all checklist lines that apply to this case. To count, a required document must be the kind of document listed rather than a similar one, must be about the subject of the case, must have all its pages, must be signed wherever the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-62", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 690}} {"id": "isc-te-00412-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Cranhall GmbH", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "1 September 2026"}, "checklist": ["Check that the placement learning plan is included and signed.", "If the intern is under 18 years old, also check that the parent or guardian consent form is included and signed.", "Check that the mentor assignment note is included and signed.", "Check that the internship agreement is included and signed.", "Check that the right to work check record is included, signed, and was issued within the last 6 months."], "submission": {"case": {"name": "Thomas Wraxell", "reference": "BC-74476", "details": ["The intern is under 18 years old."]}, "documents received": ["placement_learning_plan_wraxell.pdf - Placement learning plan for Thomas Wraxell, issued 18 May 2026. 2 pages, complete. Signed by the marketing department supervisor.", "right_to_work_check_wraxell_2025-06-18.pdf - Right to work check record for Thomas Wraxell, issued 18 June 2025. 1 page. Signed by the HR records officer.", "internship_agreement_wraxell.pdf - Internship agreement for Thomas Wraxell, issued 18 May 2026. 4 pages, complete. Signed by the marketing department head and the intern.", "mentor_assignment_note_wraxell.pdf - Mentor assignment note for Thomas Wraxell, issued 25 May 2026. 1 page. Signed by the marketing operations team lead.", "right_to_work_check_wraxell_2026-03-21.pdf - Right to work check record for Thomas Wraxell, issued 21 March 2026. 1 page. Signed by the HR records officer.", "parent_guardian_consent_wraxell.pdf - Parent or guardian consent form for Thomas Wraxell, issued 18 May 2026. 1 page. Signed by the parent or guardian."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00481-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Caelholm SAS", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "18 May 2026"}, "checklist": ["Check that the pack contains the policy machinery schedule.", "Check that the pack contains the purchase invoice for the machine.", "Check that the pack contains a signed equipment breakdown claim form.", "Check that the pack contains the machine maintenance log, issued within the last 6 months.", "Check that the pack contains the engineer's fault diagnosis report, issued within the last 3 months and signed.", "If a temporary machine was hired to keep production going, also check that the pack contains the temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Check that the pack contains the repair or replacement quotation, issued within the last 3 months."], "submission": {"case": {"name": "failed machine NT-58567", "reference": "LG-78763", "details": ["No temporary machine was hired to keep production going."]}, "documents received": ["equipment_breakdown_claim_form_NT-58567.pdf. Equipment breakdown claim form dated 8 May 2026, signed by the policyholder. 3 pages, complete.", "production_downtime_log_NT-58567.pdf. Production downtime log dated 25 March 2026, signed by the production supervisor. 2 pages, complete.", "repair_or_replacement_quotation_NT-58567.pdf. Repair or replacement quotation dated 3 March 2026. 2 pages, complete.", "machine_maintenance_log_NT-58567.pdf. Machine maintenance log dated 30 November 2025. 5 pages, complete.", "engineers_fault_diagnosis_report_NT-58567.pdf. Engineer's fault diagnosis report dated 1 May 2026, signed by the diagnosing engineer. 4 pages, complete.", "policy_machinery_schedule_NT-58567.pdf. Policy machinery schedule dated 15 April 2026. 3 pages, complete.", "purchase_invoice_NT-58567.pdf. Purchase invoice for the machine dated 26 January 2026. Single page.", "cleaning_rota_for_the_workshop_NT-58567.pdf. Cleaning rota for the workshop dated 30 November 2025. 5 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 905}} {"id": "isc-te-00189-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ovarfield GmbH", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "17 June 2026"}, "checklist": ["Costed trip estimate sheet, issued within the last 3 months and signed.", "Travel advance request form, signed.", "Employee bank detail confirmation, issued within the last 6 months and signed.", "Travel policy extract showing advance eligibility.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Trip itinerary and approval, issued within the last 3 months and signed."], "submission": {"case": {"name": "Mert Bramstad", "reference": "VR-72958", "details": ["The requested advance is above the standard advance limit."]}, "documents received": ["VR-72958_d5_trip_itinerary_and_approval.pdf. A trip itinerary and approval for Mert Bramstad, dated 8 April 2026, 2 pages, complete. It is signed by the approving manager.", "VR-72958_d1_costed_trip_estimate_sheet.pdf. A single-page costed trip estimate sheet for Mert Bramstad, dated 28 April 2026. It is signed by the employee's line manager.", "VR-72958_d4_travel_policy_extract.pdf. A single-page travel policy extract showing advance eligibility for Mert Bramstad, dated 28 May 2026.", "VR-72958_d3_employee_bank_detail_confirmation.pdf. A single-page employee bank detail confirmation for Mert Bramstad, dated 29 May 2026. It is signed by the payroll administrator.", "VR-72958_d2_travel_advance_request_form.pdf. A single-page travel advance request form for Mert Bramstad, dated 21 March 2026. It is signed by the employee.", "VR-72958_d6_finance_director_approval.pdf. A single-page finance director approval for the higher advance for Mert Bramstad, dated 11 June 2026. It is signed by the finance director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00363-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Baxfeld & Co", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "7 May 2026"}, "checklist": ["Firewall change request form, signed.", "Peer review checklist, issued within the last 1 month, signed.", "Proposed rule change specification, signed.", "Rollback plan, signed.", "If the change is planned during the year-end close period, also: freeze period exception approval, signed.", "Business justification memo, issued within the last 3 months, signed."], "submission": {"case": {"name": "firewall change CX-23740", "reference": "UB-55755", "details": ["The change is planned during the year-end close period."]}, "cover note": "Attached is the change pack for firewall change CX-23740. Everything needed is attached and complete.", "documents received": ["Proposed rule change specification for firewall change CX-23740. Date of issue: 7 February 2026. 2 pages, complete. Signed by the network engineer who prepared the specification.", "Rollback plan for firewall change CX-23740. Date of issue: 28 March 2026. 2 pages, complete. Signed by the change manager.", "Firewall change request form for firewall change CX-23740. Date of issue: 16 April 2026. 3 pages, complete. Signed by the requesting change manager.", "Freeze period exception approval for firewall change CX-23740. Date of issue: 18 March 2026. Single page. Signed by the head of the change advisory board.", "Peer review checklist for firewall change CX-23740. Date of issue: 5 May 2026. Single page. Signed by the peer reviewer.", "Business justification memo for firewall change CX-23740. Date of issue: 17 March 2026. Single page. The area where the signature would be is cropped, so it is not known whether the memo is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00447-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Delvheim SAS", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "10 August 2026"}, "checklist": ["Conference fee invoice, issued within the last 12 months", "Expense claim form, signed", "Currency conversion statement, issued within the last 6 months", "Taxi fare receipt, issued within the last 6 months", "Boarding pass stub", "Train ticket receipt"], "submission": {"case": {"name": "Thiago Sabock", "reference": "ML-97341"}, "documents received": ["Single-page train ticket receipt relating to Thiago Sabock, dated 28 April 2026.", "Single-page boarding pass stub relating to Thiago Sabock, dated 3 July 2026.", "Single-page currency conversion statement relating to Thiago Sabock, dated 13 May 2026.", "Single-page conference fee invoice relating to Thiago Sabock, dated 28 May 2026.", "Single-page taxi fare receipt relating to Thiago Sabock, dated 13 July 2025.", "Expense claim form relating to Thiago Sabock, dated 31 May 2026. 2 pages, complete. Signed by the claiming employee, Thiago Sabock."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and say whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must concern the subject of the case, all its pages must be present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-0", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 670}} {"id": "isc-te-00201-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Cindwell & Co", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "16 September 2026"}, "checklist": ["Engineer's service report, issued within the last 1 month, signed", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "Refrigerant top-up log, issued within the last 1 month, signed", "Plant room access sign-in sheet", "F-gas leak check record, issued within the last 12 months, signed", "Asset condition photograph sheet, issued within the last 1 month", "If refrigerant was added during the service, also: refrigerant recovery note, issued within the last 1 month, signed"], "submission": {"case": {"name": "air conditioning system YE-45954", "reference": "YI-92981", "details": ["Refrigerant was added during the service."]}, "documents received": ["Asset condition photograph sheet for air conditioning system YE-45954, dated 2 September 2026. 2 pages, complete.", "Refrigerant top-up log for air conditioning system YE-45954, dated 11 September 2026. Single page. Signed by the service engineer.", "Plant room access sign-in sheet for air conditioning system YE-45954, dated 22 July 2026. Single page.", "Engineer F-gas handling certificate for air conditioning system YE-45954, with expiry date 12 July 2028. Single page.", "F-gas leak check record for air conditioning system YE-45954, dated 18 June 2026. 2 pages, complete. Signed by the leak check engineer.", "Engineer's service report for air conditioning system YE-45954, dated 13 September 2026. 3 pages, complete. Signed by the service engineer.", "Thermostat calibration certificate for air conditioning system YE-45954, dated 4 January 2026. Single page.", "Electrical safety certificate for the engineer, covering air conditioning system YE-45954, with expiry date 12 July 2028. Single page.", "Refrigerant recovery note for air conditioning system YE-45954, dated 26 August 2026. Single page. Signed by the service engineer."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 744}} {"id": "isc-te-00325-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Cresklund BV", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "30 March 2026"}, "checklist": ["Obtain the bank interest statement, issued within the last 13 months.", "If the household sold a property other than its main home during the tax year, also obtain the property disposal calculation sheet, signed.", "Obtain the pension contribution certificate, issued within the last 13 months.", "Obtain the capital gains asset record.", "Obtain the rental income record.", "Obtain the childcare payment receipt, issued within the last 13 months.", "If one household member worked abroad for part of the year, also obtain the foreign earnings statement, issued within the last 13 months.", "Obtain the employment income summary, issued within the last 13 months."], "submission": {"case": {"name": "household tax affairs VX-14371", "reference": "GX-21410", "details": ["The household sold a property other than its main home during the tax year.", "One household member worked abroad for part of the year."]}, "cover note": "Could you approve this pack quickly? Everything in it is in order.", "documents received": ["Employment income summary for household tax affairs VX-14371, dated 19 November 2025. 2 pages, complete.", "Rental income record for household tax affairs VX-14371, dated 3 February 2026. 4 pages, complete.", "Bank interest statement covering household tax affairs VX-14371, dated 26 May 2025. 3 pages, complete.", "Foreign earnings statement for household tax affairs VX-14371, dated 27 July 2025. 2 pages, complete.", "Property disposal calculation sheet for household tax affairs VX-14371, dated 27 February 2026. 2 pages, complete. Signed by the household's own tax filer.", "Tax return draft printout for household tax affairs VX-14371, dated 1 January 2026. 6 pages, complete. Signed by the household's own tax filer.", "Capital gains asset record for household tax affairs VX-14371, dated 28 January 2026. 2 pages, complete.", "Childcare payment receipt for household tax affairs VX-14371, dated 26 September 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 940}} {"id": "isc-te-00157-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Morvholm SAS", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "6 March 2026"}, "checklist": ["Financial assessment form, signed.", "If the adult owns property that could be considered in the financial assessment, also: property valuation report, issued within the last 12 months and signed.", "Benefit entitlement letters, issued within the last 12 months.", "Capacity assessment record, signed.", "Proof of identity, valid (not expired) on the date of the review.", "Support plan, signed."], "submission": {"case": {"name": "Dimitris Yellani", "reference": "RL-43050", "details": ["The adult owns property that could be considered in the financial assessment."]}, "cover note": "This pack has already been checked by a colleague before it was sent to you. Please review it as usual.", "documents received": ["Property valuation report - Dimitris Yellani.pdf. Property valuation report for Dimitris Yellani, dated 7 August 2025. 2 pages, complete. Signed by the valuer.", "Support plan - Dimitris Yellani.pdf. Support plan for Dimitris Yellani, dated 27 January 2026. 6 pages, complete. Signed by the support planner.", "Financial assessment form - Dimitris Yellani.pdf. Financial assessment form for Dimitris Yellani, dated 31 January 2026. 6 pages, complete. Signed by the adult.", "Benefit entitlement letters - Dimitris Yellani.pdf. Benefit entitlement letters for Dimitris Yellani, dated 2 August 2025. 2 pages, complete.", "Proof of identity - Dimitris Yellani.pdf. Single-page proof of identity for Dimitris Yellani. The date of issue is smudged and cannot be read.", "Capacity assessment record - Dimitris Yellani.pdf. Capacity assessment record for Dimitris Yellani, dated 23 November 2025. 4 pages, complete. Signed by the assessor."]}}, "question": {"type": "choice", "instructions": "Ask yourself: does the pack match the checklist? Review each line of the checklist that is relevant to this case. A required document only counts if it is the kind of document the list names (not a similar one), is about the case subject, has all its pages, is signed in every place the checklist asks for a signature, was not expired on the review date, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for this case. complete: all applicable lines are met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one line cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-61", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 843}} {"id": "isc-te-00425-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Zervstead plc", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "7 April 2026"}, "checklist": ["Support plan, signed", "Proof of identity, valid (not expired) on the date of the review", "Needs assessment report, signed", "Safeguarding referral form, issued within the last 12 months, signed", "If the adult owns property that could be considered in the financial assessment, also: property valuation report, issued within the last 12 months, signed", "Benefit entitlement letters, issued within the last 12 months"], "submission": {"case": {"name": "Emre Brodett", "reference": "QM-52065", "details": ["The adult does not own property that could be considered in the financial assessment."]}, "documents received": ["Benefit entitlement letters - Emre Brodett. The letters are dated 22 November 2025. 2 pages, complete.", "Needs assessment report - Emre Brodett. The report is dated 27 January 2026. 12 pages, complete. It is signed by the assessing social worker.", "Support plan - Emre Brodett. The plan is dated 27 January 2026. 6 pages, complete. It is signed by the support planner.", "Financial assessment form - Emre Brodett. The form is dated 13 February 2026. 6 pages, complete. It is signed by the financial assessment officer.", "Proof of identity - Emre Brodett. The document shows an expiry date of 21 September 2026. It is a single page.", "Safeguarding referral form - Emre Brodett. The form is dated 16 November 2025. 2 pages, complete. It is signed by the safeguarding lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00147-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Mersheim Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "10 April 2026"}, "checklist": ["If the borrower is self-employed, also include: two most recent tax year overviews, issued within the last 18 months, signed.", "If the property being bought is a flat in a shared building, also include: management company pack, issued within the last 3 months.", "Property valuation report, issued within the last 3 months, signed.", "Three months of bank statements, issued within the last 3 months.", "Three most recent payslips, issued within the last 3 months.", "Passport, valid (not expired) on the date of the review.", "Gifted deposit letter, issued within the last 3 months, signed."], "submission": {"case": {"name": "Charlotte Paskthwaite", "reference": "ZE-83977", "details": ["The borrower is self-employed.", "The property being bought is a flat in a shared building."]}, "documents received": ["Property valuation report for Charlotte Paskthwaite. Date of issue: 3 March 2026. 8 pages, complete. Signed by the surveyor who carried out the valuation.", "Three most recent payslips for Charlotte Paskthwaite. Date of issue: 13 March 2026. 3 pages, complete.", "Three months of bank statements for Charlotte Paskthwaite. Date of issue: 13 February 2026. 9 pages, complete.", "Two most recent tax year overviews for Charlotte Paskthwaite. Date of issue: 17 July 2025. 4 pages, complete. Signed by HMRC, the issuing tax authority.", "Management company pack for Charlotte Paskthwaite. Date of issue: 17 February 2026. 12 pages, complete.", "Passport for Charlotte Paskthwaite. Expiry date: 13 April 2028. 2 pages, complete.", "Gifted deposit letter for Charlotte Paskthwaite. Date of issue: 8 August 2025. Single page. Signed by the person gifting the deposit."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 867}} {"id": "isc-te-00227-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Gravlock plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "24 June 2026"}, "checklist": ["supplier quality questionnaire, issued within the last 12 months, signed", "supplier capacity declaration, issued within the last 12 months, signed", "supplier audit report, issued within the last 24 months, signed", "supplier corrective action plan, issued within the last 6 months, signed", "financial stability statement, issued within the last 12 months, signed", "certified quality management system certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Mersheim BV", "reference": "TB-65922"}, "documents received": ["TB-65922_supplier_capacity_declaration_Mersheim_v4.pdf - Supplier capacity declaration for Mersheim BV. Date of issue: 2 July 2025. 2 pages, complete. Signed by the supplier's operations manager.", "TB-65922_supplier_corrective_action_plan_Mersheim.pdf - Supplier corrective action plan for Mersheim BV. Date of issue: 11 March 2026. 3 pages, complete. Signed by the supplier's quality manager.", "TB-65922_financial_stability_statement_Mersheim.pdf - Financial stability statement for Mersheim BV. Date of issue: 11 April 2026. 2 pages, complete. Signed by the supplier's finance director.", "TB-65922_supplier_audit_report_Mersheim.pdf - Supplier audit report for Mersheim BV. Date of issue: 2 July 2025. 8 pages, complete. Signed by the lead auditor.", "TB-65922_certified_qms_certificate_Mersheim.pdf - Certified quality management system certificate for Mersheim BV. Expiry date: 19 October 2028. Single page.", "TB-65922_supplier_quality_questionnaire_Mersheim.pdf - Supplier quality questionnaire for Mersheim BV. Date of issue: 19 November 2025. 4 pages, complete. Signed by the supplier's quality manager.", "TB-65922_raw_material_certificate_of_analysis_Mersheim.pdf - Raw material certificate of analysis for Mersheim BV. Date of issue: 18 February 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "TB-65922_supplier_capacity_declaration_Mersheim_v5.pdf - Supplier capacity declaration for Mersheim BV. Date of issue: 27 August 2024. 2 pages, complete. Signed by the supplier's operations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 976}} {"id": "isc-te-00017-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Yondgate Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "19 August 2026"}, "checklist": ["Check that the pack contains a prerequisite certificate.", "Check that the pack contains venue access instructions issued within the last 3 months.", "Check that the pack contains an employer sponsorship letter issued within the last 3 months and signed.", "Check that the pack contains payment confirmation issued within the last 3 months."], "submission": {"case": {"name": "course booking CC-42557", "reference": "LU-53975"}, "documents received": ["special_requirements_note_CC-42557_20260519.pdf. Special requirements note for course booking CC-42557. It shows its date of issue as 19 May 2026 and is a single page.", "employer_sponsorship_letter_CC-42557_20260630.pdf. Employer sponsorship letter for course booking CC-42557. It shows its date of issue as 30 June 2026 and is a single page. It is signed by the employer's authorising signatory.", "prerequisite_certificate_CC-42557.pdf. Prerequisite certificate for course booking CC-42557. It shows its date of issue as 9 August 2026 and is a single page.", "payment_confirmation_CC-42557_20260731.pdf. Payment confirmation for course booking CC-42557. It shows its date of issue as 31 July 2026 and is a single page.", "venue_access_instructions_CC-42557_20260608.pdf. Venue access instructions for course booking CC-42557. It shows its date of issue as 8 June 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack matches the checklist. Take each checklist line that applies to this case in turn. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete: every applicable line is met (extra documents do not matter). Choose incomplete: at least one applicable line is not met. Choose unclear: no line is clearly unmet, but at least one cannot be decide from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-20", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 813}} {"id": "isc-te-00335-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Dravwater Ltd", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "13 May 2026"}, "checklist": ["Check for proof of national insurance number.", "Check for proof of earnings, issued within the last 1 months.", "Check for proof of identity, valid (not expired) on the date of the review.", "Check for rent book or rent payment schedule, issued within the last 2 months.", "Check for proof of savings, issued within the last 2 months.", "Check for current tenancy agreement, signed."], "submission": {"case": {"name": "Daniel Nebbford", "reference": "YX-55936"}, "documents received": ["Rent book or rent payment schedule for Daniel Nebbford. Date of issue: 3 May 2026. 4 pages, complete.", "Benefit claim form for Daniel Nebbford. Expiry date: 19 July 2027. 12 pages, complete. Signed by the claimant.", "Current tenancy agreement for Daniel Nebbford. Date of issue: 30 January 2026. 12 pages, complete. Signed by the landlord.", "Proof of identity for Daniel Nebbford. Expiry date: 29 October 2026. 1 page.", "Proof of national insurance number for Daniel Nebbford. Date of issue: 18 April 2026. 1 page.", "Proof of earnings for Daniel Nebbford. Date of issue: 6 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 727}} {"id": "isc-te-00029-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Ebrmoor BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "17 July 2026"}, "checklist": ["Investigator appointment letter, issued within the last 3 months", "Grievance procedure acknowledgement, issued within the last 3 months and signed", "Evidence bundle index, signed", "Meeting invitation with rights explained, issued within the last 1 months", "Previous grievance outcome letter, issued within the last 24 months", "Written grievance statement, signed", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed"], "submission": {"case": {"name": "Daan Ustett", "reference": "GC-91390", "details": ["The grievance makes no allegation of bullying."]}, "documents received": ["Meeting invitation with rights explained. Invitation about Daan Ustett dated 3 July 2026. Single page.", "Written grievance statement. Statement about Daan Ustett dated 4 April 2026. 3 pages, complete, signed by Daan Ustett.", "Adjustment request record. Record about Daan Ustett dated 23 May 2026. Single page, signed by Daan Ustett.", "Evidence bundle index. Index about Daan Ustett dated 23 March 2026. 2 pages, complete, signed by the case investigator.", "Witness list. List about Daan Ustett dated 4 June 2026. Single page, signed by the case investigator.", "Previous grievance outcome letter. Letter about Daan Ustett dated 19 December 2024. 2 pages, complete.", "Grievance procedure acknowledgement. Acknowledgement about Daan Ustett dated 15 May 2026. Single page, signed by Daan Ustett.", "Investigator appointment letter. Letter about Daan Ustett dated 17 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 825}} {"id": "isc-te-00465-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Zalddale Group", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "13 July 2026"}, "checklist": ["Prerequisite certificate included", "If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "Employer sponsorship letter included (issued within the last 3 months, signed)", "Course booking form included (signed)", "Payment confirmation included (issued within the last 3 months)", "If the delegate requires an adjusted learning plan, also: learning support agreement (signed)"], "submission": {"case": {"name": "course booking BS-25601", "reference": "KW-27021", "details": ["The course leads to a licensed qualification.", "The delegate requires an adjusted learning plan."]}, "documents received": ["payment_confirmation_BS-25601.pdf. A single-page payment confirmation for course booking BS-25601, issued on 3 May 2026.", "cancellation_policy_acceptance_BS-25601.pdf. A single-page cancellation policy acceptance for course booking BS-25601, issued on 27 May 2026, signed by the delegate.", "course_booking_form_BS-25601.pdf. A course booking form for course booking BS-25601, issued on 3 April 2026. 2 pages, complete, signed by the delegate.", "learning_support_agreement_BS-25601.pdf. A single-page learning support agreement for course booking BS-25601, issued on 19 March 2026, signed by the course tutor.", "venue_access_instructions_BS-25601.pdf. A single-page set of venue access instructions for course booking BS-25601, issued on 3 June 2026.", "employer_sponsorship_letter_BS-25601.pdf. A single-page employer sponsorship letter for course booking BS-25601, issued on 25 April 2026, signed by the employer's authorised signatory.", "licence_eligibility_declaration_BS-25601.pdf. A single-page licence eligibility declaration for course booking BS-25601, issued on 21 June 2026, signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 889}} {"id": "isc-te-00349-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Fervvik Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "17 July 2026"}, "checklist": ["Nominated store preference form, signed", "Terms and conditions acceptance sheet, signed", "Initial points balance statement, issued within the last 3 months", "Identity verification document, valid (not expired) on the date of the review", "If the customer is transferring points from a rival scheme, also: points transfer evidence statement, issued within the last 3 months and signed", "Customer contact details sheet, signed"], "submission": {"case": {"name": "Giulia Natell", "reference": "BP-19825", "details": ["The customer is not transferring points from any other scheme."]}, "documents received": ["terms_and_conditions_acceptance_sheet_Giulia_Natell.pdf. Terms and conditions acceptance sheet for Giulia Natell, dated 26 June 2026. A single page, signed by Giulia Natell.", "points_transfer_request_Giulia_Natell.pdf. Points transfer request for Giulia Natell, dated 5 July 2026. A single page, signed by Giulia Natell.", "initial_points_balance_statement_Giulia_Natell.pdf. Initial points balance statement for Giulia Natell, dated 11 July 2026. A single page.", "loyalty_scheme_enrolment_form_Giulia_Natell.pdf. Loyalty scheme enrolment form for Giulia Natell, dated 17 June 2026. A single page, signed by Giulia Natell.", "customer_contact_details_sheet_Giulia_Natell.pdf. Customer contact details sheet for Giulia Natell, dated 20 March 2026. A single page, signed by Giulia Natell.", "nominated_store_preference_form_Giulia_Natell.pdf. Nominated store preference form for Giulia Natell, dated 28 June 2026. A single page, signed by Giulia Natell.", "identity_verification_document_Giulia_Natell.pdf. Identity verification document for Giulia Natell, with an expiry date of 10 May 2027. A single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 854}} {"id": "isc-te-00455-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Prydwood Inc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "28 July 2026"}, "checklist": ["Check that there is an outstanding advance clearance check, signed.", "Check that there is a travel advance request form, signed.", "Check that there is an employee bank detail confirmation, issued within the last 6 months and signed.", "Check that there is a travel policy extract showing advance eligibility."], "submission": {"case": {"name": "Lotte Mabaker", "reference": "WY-52421"}, "documents received": ["Employee bank detail confirmation for Lotte Mabaker, dated 17 July 2026. Single page, signed by the payroll officer.", "Travel policy extract showing advance eligibility for Lotte Mabaker, dated 8 June 2026. Single page.", "Outstanding advance clearance check for Lotte Mabaker, dated 3 May 2026. Single page, signed by the accounts payable supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 600}} {"id": "isc-te-00279-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Yondbury LLP", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "9 March 2026"}, "checklist": ["Outstanding receipts list", "Bank reconciliation statement, signed", "Bank statement for the period, issued within the last 2 months", "If the reconciliation shows an unexplained difference that is not an outstanding item, also: unexplained difference investigation note, signed", "General ledger cash account listing", "Outstanding payments list"], "submission": {"case": {"name": "company bank account HK-23180", "reference": "KP-23420", "details": ["The reconciliation shows no unexplained difference."]}, "documents received": ["Outstanding payments list for company bank account HK-23180, dated 4 March 2026. 1 page.", "Bank statement for the period for company bank account HK-23180, dated 15 February 2026. 4 pages, complete.", "Outstanding receipts list for company bank account HK-23180, dated 12 November 2025. 1 page.", "Bank reconciliation statement for company bank account HK-23180, dated 22 January 2026. 2 pages, complete. Signed by the financial controller.", "General ledger cash account listing for company bank account HK-23180, dated 28 February 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 705}} {"id": "isc-te-00228-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lindcourt & Co", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "15 May 2026"}, "checklist": ["Training matrix extract, issued within the last 3 months, signed.", "Calibration status summary, issued within the last 1 months, signed.", "Layout tour plan, signed.", "Audit scope statement, signed.", "Audit agenda, signed.", "Document control list, issued within the last 3 months, signed."], "submission": {"case": {"name": "customer audit visit HY-50028", "reference": "PO-24718"}, "documents received": ["HY-50028_audit_scope_statement.pdf. Audit scope statement for customer audit visit HY-50028, dated 7 March 2026. Single page, with a signature from the Quality Manager.", "HY-50028_calibration_status_summary.pdf. Calibration status summary for customer audit visit HY-50028, dated 5 May 2026. 2 pages, complete, with a signature from the Quality Manager.", "HY-50028_document_control_list.pdf. Document control list for customer audit visit HY-50028, dated 20 March 2026. 4 pages, complete, but a sticky note covers the signature block, so it cannot be seen whether it is signed.", "HY-50028_layout_tour_plan.pdf. Layout tour plan for customer audit visit HY-50028, dated 8 February 2026. Single page, with a signature from the Facilities Supervisor.", "HY-50028_audit_agenda.pdf. Audit agenda for customer audit visit HY-50028, dated 28 March 2026. Single page, with a signature from the Quality Manager.", "HY-50028_open_corrective_action_list.pdf. Open corrective action list for customer audit visit HY-50028, dated 3 May 2026. 2 pages, complete, with a signature from the Quality Manager.", "HY-50028_training_matrix_extract.pdf. Training matrix extract for customer audit visit HY-50028, dated 12 May 2026. 3 pages, complete, with a signature from the Training Coordinator.", "HY-50028_previous_audit_findings_closure_file.pdf. Previous audit findings closure file for customer audit visit HY-50028, dated 25 January 2026. 6 pages, complete, with a signature from the Quality Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 956}} {"id": "isc-te-00210-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jundstead BV", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "20 April 2026"}, "checklist": ["Production downtime log - confirm it was issued within the last 3 months and is signed", "Purchase invoice for the machine", "Repair or replacement quotation - confirm it was issued within the last 3 months", "Equipment breakdown claim form - confirm it is signed"], "submission": {"case": {"name": "failed machine BH-86750", "reference": "XI-70320"}, "documents received": ["Purchase invoice for the machine, for failed machine BH-86750. Date of issue: 11 March 2026. Single page.", "Production downtime log for failed machine BH-86750. Date of issue: 6 February 2026. 2 pages, complete. Signed by the production supervisor.", "Repair or replacement quotation for failed machine BH-86750. Date of issue: 5 March 2026. 2 pages, complete.", "Policy machinery schedule for failed machine BH-86750. Date of issue: 23 December 2025. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is this pack complete when measured against the checklist? Go line by line through every checklist item relevant to this case. To count, a required document must be the kind of document listed (a similar kind will not do), be about the subject of the case, have all its pages present, be signed wherever the checklist asks for a signature, not be expired on the date of the review, and have been issued during the period the checklist allows. A conditional line applies only where its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, such as a needed date, signature or page count not being visible, a document's kind being impossible to tell, or the case details not saying whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-7", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 660}} {"id": "isc-te-00434-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Quelbrook SAS", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "29 April 2026"}, "checklist": ["Experiment safety clearance form, signed, is included.", "Home institution endorsement letter, issued within the last 6 months and signed, is included.", "Radiation safety training certificate, issued within the last 24 months and signed, is included.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed, is included.", "Host scientist invitation letter, issued within the last 6 months and signed, is included.", "Photo identity document, valid (not expired) on the date of the review, is included."], "submission": {"case": {"name": "Rory Tibeau", "reference": "TW-86879", "details": ["The researcher will work outside standard opening hours."]}, "documents received": ["insurance_declaration_facility_work_Tibeau.pdf - Insurance declaration for facility work for Rory Tibeau, dated 25 June 2025. 1 page. Signed by the home institution insurance officer.", "photo_identity_document_Tibeau.pdf - Photo identity document for Rory Tibeau, expiring 3 December 2026. 1 page.", "host_scientist_invitation_letter_Tibeau.pdf - Host scientist invitation letter for Rory Tibeau, dated 12 April 2026. 1 page. Signed by the host scientist.", "experiment_safety_clearance_form_Tibeau.pdf - Experiment safety clearance form for Rory Tibeau, dated 15 April 2026. 3 pages, complete. Signed by the facility safety officer.", "home_institution_endorsement_letter_Tibeau.pdf - Home institution endorsement letter for Rory Tibeau, dated 27 November 2025. 1 page. Signed by the home institution registrar.", "facility_access_application_form_Tibeau.pdf - Facility access application form for Rory Tibeau, dated 6 February 2026. 2 pages, complete. Signed by the applicant.", "radiation_safety_training_certificate_Tibeau.pdf - Radiation safety training certificate for Rory Tibeau, dated 14 June 2025. 1 page. Signed by the radiation protection officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 881}} {"id": "isc-te-00434-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Quelbrook SAS", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "29 April 2026"}, "checklist": ["Experiment safety clearance form, signed, is included.", "Home institution endorsement letter, issued within the last 6 months and signed, is included.", "Radiation safety training certificate, issued within the last 24 months and signed, is included.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed, is included.", "Host scientist invitation letter, issued within the last 6 months and signed, is included.", "Photo identity document, valid (not expired) on the date of the review, is included."], "submission": {"case": {"name": "Rory Tibeau", "reference": "TW-86879", "details": ["The researcher will work only during standard opening hours."]}, "documents received": ["radiation_safety_training_certificate_Tibeau.pdf - Radiation safety training certificate for Rory Tibeau, dated 14 June 2025. 1 page. Signed by the radiation protection officer.", "photo_identity_document_Tibeau.pdf - Photo identity document for Rory Tibeau, expiring 3 December 2026. 1 page.", "experiment_safety_clearance_form_Tibeau.pdf - Experiment safety clearance form for Rory Tibeau, dated 15 April 2026. 3 pages, complete. Signed by the facility safety officer.", "home_institution_endorsement_letter_Tibeau.pdf - Home institution endorsement letter for Rory Tibeau, dated 27 November 2025. 1 page. Signed by the home institution registrar.", "host_scientist_invitation_letter_Tibeau.pdf - Host scientist invitation letter for Rory Tibeau, dated 12 April 2026. 1 page. Signed by the host scientist."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 796}} {"id": "isc-te-00183-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Pentmere BV", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "23 June 2026"}, "checklist": ["Final backup confirmation, issued within the last 3 months, signed.", "Licence reassignment note, issued within the last 3 months, signed.", "Data migration confirmation, issued within the last 3 months, signed.", "Network disconnection confirmation, issued within the last 1 months, signed.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server CA-57344", "reference": "IG-40941", "details": ["The server holds archived records that must be kept."]}, "documents received": ["Dependent systems check report for retired server CA-57344, dated 12 May 2026, 3 pages, complete.", "Network disconnection confirmation for retired server CA-57344, dated 16 June 2026, single page; the signature line is empty, so it is not signed.", "Data migration confirmation for retired server CA-57344, dated 16 May 2026, 2 pages, complete, signed by the data migration lead.", "Archive retention confirmation for retired server CA-57344, dated 17 April 2026, 2 pages, complete, signed by the records manager.", "Licence reassignment note for retired server CA-57344, dated 23 May 2026, single page, signed by the licence manager.", "Final backup confirmation for retired server CA-57344, dated 15 April 2026, single page, signed by the backup administrator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00029-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Ebrmoor BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "17 July 2026"}, "checklist": ["Investigator appointment letter, issued within the last 3 months", "Grievance procedure acknowledgement, issued within the last 3 months and signed", "Evidence bundle index, signed", "Meeting invitation with rights explained, issued within the last 1 months", "Previous grievance outcome letter, issued within the last 24 months", "Written grievance statement, signed", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed"], "submission": {"case": {"name": "Daan Ustett", "reference": "GC-91390"}, "documents received": ["Previous grievance outcome letter. Letter about Daan Ustett dated 19 December 2024. 2 pages, complete.", "Written grievance statement. Statement about Daan Ustett dated 4 April 2026. 3 pages, complete, signed by Daan Ustett.", "Evidence bundle index. Index about Daan Ustett dated 23 March 2026. 2 pages, complete, signed by the case investigator.", "Witness list. List about Daan Ustett dated 4 June 2026. Single page, signed by the case investigator.", "Meeting invitation with rights explained. Invitation about Daan Ustett dated 3 July 2026. Single page.", "Grievance procedure acknowledgement. Acknowledgement about Daan Ustett dated 15 May 2026. Single page, signed by Daan Ustett.", "Investigator appointment letter. Letter about Daan Ustett dated 17 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 776}} {"id": "isc-te-00452-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Bravhaven Inc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "12 August 2026"}, "checklist": ["Leaver notification form, signed.", "Final payroll cut-off note, signed, issued within the last 1 months.", "Line manager confirmation, signed, issued within the last 1 months.", "Shared mailbox handover record, signed, issued within the last 1 months.", "Access rights inventory, issued within the last 1 months.", "Service desk ticket closure summary, issued within the last 1 months."], "submission": {"case": {"name": "Andrew Vellcombe", "reference": "CI-98740"}, "documents received": ["Access rights inventory for Andrew Vellcombe, dated 24 July 2026. 4 pages, complete.", "Service desk ticket closure summary for Andrew Vellcombe, dated 6 December 2025. 3 pages, complete.", "Leaver notification form for Andrew Vellcombe, dated 3 May 2026. 2 pages, complete. Signed by the line manager.", "Final payroll cut-off note for Andrew Vellcombe, dated 22 July 2026. Single page. Signed by the payroll officer.", "Service desk ticket closure summary for Andrew Vellcombe, dated 24 July 2026. 3 pages, complete.", "Non-disclosure reminder acknowledgement for Andrew Vellcombe, dated 8 June 2026. Single page. Signed by the departing employee.", "Line manager confirmation for Andrew Vellcombe, dated 26 July 2026. Single page. Signed by the line manager.", "Shared mailbox handover record for Andrew Vellcombe, dated 31 July 2026. 2 pages, complete. Signed by the shared mailbox administrator."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Output complete if every applicable line is met (extra documents do not matter). Output incomplete if at least one applicable line is not met. Output unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so base your judgement on the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-31", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00182-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Faldfell Ltd", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "11 March 2026"}, "checklist": ["Licence reassignment note issued within the last 3 months, signed.", "Asset register update issued within the last 1 months.", "Data wipe certificate issued within the last 3 months, signed.", "Final backup confirmation issued within the last 3 months, signed.", "Decommission request form, signed."], "submission": {"case": {"name": "retired server ZL-17533", "reference": "WS-76990"}, "documents received": ["Dependent systems check report for retired server ZL-17533, dated 5 January 2026, 3 pages, complete.", "Single-page final backup confirmation for retired server ZL-17533, dated 18 February 2026, signed by the backup operator.", "Single-page data wipe certificate for retired server ZL-17533, dated 22 February 2026, signed by the data sanitisation technician.", "File scan_0001.pdf: the file will not open, so its contents cannot be seen.", "Decommission request form for retired server ZL-17533, dated 19 December 2025, 2 pages, complete, signed by the requesting system owner.", "Single-page licence reassignment note for retired server ZL-17533, dated 17 December 2025, signed by the licence administrator.", "Single-page asset register update for retired server ZL-17533, dated 8 March 2026.", "Single-page licence reassignment note for retired server ZL-17533, dated 19 March 2025, signed by the licence administrator."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Review every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-71", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00368-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Zervwood & Co", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "1 September 2026"}, "checklist": ["Confirm that the bank charges and interest explanation sheet is included and signed.", "Confirm that the reviewer sign-off sheet for the reconciliation is included and signed.", "Confirm that the general ledger cash account listing is included.", "Confirm that the outstanding payments list is included.", "If the reconciliation shows an unexplained difference that is not an outstanding item, also confirm that the unexplained difference investigation note is included and signed.", "Confirm that the outstanding receipts list is included."], "submission": {"case": {"name": "company bank account PV-89003", "reference": "FU-96762", "details": ["The reconciliation shows an unexplained difference that is not an outstanding item."]}, "documents received": ["Reviewer sign-off sheet for the reconciliation - PV-89003. The sheet is dated 16 August 2026 and is 1 page. It is signed by the financial controller.", "Unexplained difference investigation note - PV-89003. The note is dated 9 August 2026, 2 pages, complete. It is signed by the financial controller.", "Outstanding payments list - PV-89003. The list is dated 30 June 2026 and is 1 page.", "Bank charges and interest explanation sheet - PV-89003. The sheet is dated 2 August 2026 and is 1 page. It is signed by the financial controller.", "Direct debit mandate report from the bank - PV-89003. The report is dated 22 July 2026, 2 pages, complete.", "General ledger cash account listing - PV-89003. The listing is dated 17 May 2026, 3 pages, complete.", "Outstanding receipts list - PV-89003. The list is dated 13 August 2026 and is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 832}} {"id": "isc-te-00004-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Arvhaven Inc", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "26 June 2026"}, "checklist": ["Risk assessment, issued within the last 3 months and signed", "Business justification memo, issued within the last 3 months and signed", "Proposed rule change specification, signed", "Firewall change request form, signed", "If the change opens a new inbound connection from the internet, also: internet exposure review certificate, issued within the last 1 months and signed"], "submission": {"case": {"name": "firewall change XI-19991", "reference": "SY-92295"}, "cover note": "I have put this pack together for firewall change XI-19991, but I am not sure everything needed is there. Could you check it over and let me know if anything else is required?", "documents received": ["Risk assessment for firewall change XI-19991, dated 20 April 2026, 2 pages, complete. Signed by the network security lead.", "Business justification memo for firewall change XI-19991, dated 10 June 2026, single page. Signed by the requesting business owner.", "Internet exposure review certificate for firewall change XI-19991, dated 5 June 2026, 2 pages, complete. Signed by the security reviewer.", "Firewall change request form for firewall change XI-19991, dated 1 June 2026, 3 pages, complete. Signed by the requesting business owner.", "Proposed rule change specification for firewall change XI-19991, dated 18 April 2026, 2 pages, complete. Signed by the network engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 770}} {"id": "isc-te-00310-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Pellcombe GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "28 August 2026"}, "checklist": ["Asbestos survey", "If the warehouse stores food products, also: food storage approval certificate, valid (not expired) on the date of the review", "Planning permission", "Racking inspection report, issued within the last 12 months, signed", "Fire safety certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "warehouse TI-60354", "reference": "YI-31010", "details": ["The warehouse stores food products."]}, "documents received": ["Fire safety certificate for warehouse TI-60354, showing an expiry date of 25 June 2028. 2 pages, complete.", "Warehouse insurance policy for warehouse TI-60354, showing an expiry date of 7 December 2026. 6 pages, complete.", "Food storage approval certificate for warehouse TI-60354, showing an expiry date of 7 February 2029. Single page.", "Racking inspection report for warehouse TI-60354, dated 29 November 2025. 2 pages, complete. Signed by the inspecting engineer.", "Asbestos survey for warehouse TI-60354, dated 15 July 2026. 5 pages, complete.", "Planning permission for warehouse TI-60354, dated 30 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 735}} {"id": "isc-te-00444-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Rosford Inc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "9 June 2026"}, "checklist": ["Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Root cause analysis report, issued within the last 3 months, signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Customer impact statement, issued within the last 3 months."], "submission": {"case": {"name": "production incident HL-93807", "reference": "ZA-47773"}, "documents received": ["Vendor outage acknowledgement letter for production incident HL-93807, dated 16 May 2026. A single page, signed by the vendor account manager.", "Customer impact statement for production incident HL-93807, dated 4 April 2026. 2 pages, complete.", "Follow-up owner assignment sheet for production incident HL-93807, dated 11 May 2026. A single page, signed by the reliability engineering lead.", "Root cause analysis report for production incident HL-93807, dated 5 April 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Incident timeline for production incident HL-93807, dated 3 May 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 724}} {"id": "isc-te-00046-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Zaldhurst Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "1 June 2026"}, "checklist": ["Financial stability statement, issued within the last 12 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed.", "Supplier self-assessment report, issued within the last 12 months and signed.", "Certified quality management system certificate, valid (not expired) on the date of the review.", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months and signed."], "submission": {"case": {"name": "Eskvale plc", "reference": "VY-19567", "details": ["The supplier subcontracts part of the production."]}, "cover note": "This pack has already been checked by a colleague, so it should be ready to go through.", "documents received": ["Eskvale_plc_financial_stability_statement_23March2026.pdf — Financial stability statement for Eskvale plc, dated 23 March 2026. 2 pages, complete. Signed by the finance director of Eskvale plc.", "Eskvale_plc_supplier_capacity_declaration_20June2025.pdf — Supplier capacity declaration for Eskvale plc, dated 20 June 2025. 2 pages, complete. Signed by the operations director of Eskvale plc.", "Document_scan_file_08.pdf — The scan is blank and nothing on it can be made out, so its contents cannot be seen.", "Eskvale_plc_subcontractor_approval_record_7October2025.pdf — Subcontractor approval record for Eskvale plc, dated 7 October 2025. 2 pages, complete. Signed by the purchasing manager of Eskvale plc.", "Eskvale_plc_certified_QMS_certificate_29October2027.pdf — Certified quality management system certificate for Eskvale plc, showing an expiry date of 29 October 2027. Single page.", "Eskvale_plc_supplier_quality_questionnaire_13April2026.pdf — Supplier quality questionnaire for Eskvale plc, dated 13 April 2026. 4 pages, complete. Signed by the quality manager of Eskvale plc."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 886}} {"id": "isc-te-00361-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Zervcrest Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "11 August 2026"}, "checklist": ["Confirm the pack contains the proposed rule change specification, signed.", "Confirm the pack contains the risk assessment, issued within the last 3 months, signed.", "Confirm the pack contains the business justification memo, issued within the last 3 months, signed.", "Confirm the pack contains the firewall change request form, signed.", "If the change is planned during the year-end close period, also: confirm the pack contains the freeze period exception approval, signed.", "If the change opens a new inbound connection from the internet, also: confirm the pack contains the internet exposure review certificate, issued within the last 1 months, signed."], "submission": {"case": {"name": "firewall change WU-46525", "reference": "PN-13005", "details": ["The change is planned for a normal working week.", "The change only affects internal connections between servers."]}, "documents received": ["Proposed rule change specification, firewall change WU-46525. Date of issue: 4 May 2026. 2 pages, complete. Signed by the network security architect.", "Business justification memo, firewall change WU-46525. Date of issue: 17 July 2026. Single page. Signed by the requesting business line manager.", "Risk assessment, firewall change WU-46525. Date of issue: 14 July 2026. 2 pages, complete. Signed by the information security risk analyst.", "Project charter for an unrelated initiative, filed with the pack for firewall change WU-46525. Date of issue: 17 July 2026. Single page. Signed by the project sponsor.", "Firewall change request form, firewall change WU-46525. Date of issue: 26 May 2026. 3 pages, complete. Signed by the requesting network engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 837}} {"id": "isc-te-00143-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Sardbrook Limited", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "17 August 2026"}, "checklist": ["Confirm the pack contains an IT equipment loan form that has been signed.", "Confirm the pack contains a placement learning plan that has been signed.", "Confirm the pack contains a workplace induction checklist that has been issued within the last 1 months and that has been signed.", "Confirm the pack contains an emergency contact form.", "Confirm the pack contains a mentor assignment note that has been signed."], "submission": {"case": {"name": "Lukas Natby", "reference": "WQ-44926"}, "documents received": ["A one-page mentor assignment note for Lukas Natby, dated 10 June 2026, signed by the mentoring programme lead.", "A workplace induction checklist for Lukas Natby, dated 1 August 2026; 2 pages, complete. Its signature line is empty, so it is not signed.", "A placement learning plan for Lukas Natby, dated 8 July 2026; 2 pages, complete, signed by the placement supervisor.", "A one-page emergency contact form for Lukas Natby, dated 24 June 2026.", "A one-page IT equipment loan form for Lukas Natby, dated 6 May 2026, signed by the IT equipment loans officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 682}} {"id": "isc-te-00251-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Halvness Ltd", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "2 July 2026"}, "checklist": ["If the equipment is above the major purchase threshold, also include: tender waiver justification (signed)", "equipment purchase request form (signed)", "cost-benefit justification", "maintenance plan", "training needs assessment (signed)", "installation requirements note"], "submission": {"case": {"name": "equipment JG-44908", "reference": "EJ-48033", "details": ["The equipment is below the major purchase threshold."]}, "documents received": ["training needs assessment - JG-44908.pdf. This is the training needs assessment for equipment JG-44908, dated 8 May 2026. It is a single page and is signed by the training coordinator.", "scan 048.pdf. The file will not open, so its contents cannot be seen.", "equipment purchase request form - JG-44908.pdf. This is the equipment purchase request form for equipment JG-44908, dated 18 April 2026, 2 pages, complete. It is signed by the requesting department head.", "installation requirements note - JG-44908.pdf. This is the installation requirements note for equipment JG-44908, dated 29 April 2026, 2 pages, complete.", "cost-benefit justification - JG-44908.pdf. This is the cost-benefit justification for equipment JG-44908, dated 28 May 2026, 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 752}} {"id": "isc-te-00141-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Aldholm plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "7 July 2026"}, "checklist": ["Confirm the pack includes the account closure procedure.", "Confirm the pack includes the account request form, signed.", "Confirm the pack includes the naming convention approval, signed.", "If the account will be run by an external agency, also: confirm the pack includes the agency access agreement, signed.", "Confirm the pack includes the content escalation route, signed.", "Confirm the pack includes the platform terms acceptance record, signed.", "Confirm the pack includes the two-factor authentication confirmation, issued within the last 3 months."], "submission": {"case": {"name": "new social media account SA-68108", "reference": "VD-16282", "details": ["The account will be run entirely by in-house staff."]}, "documents received": ["A single-page account purpose statement for new social media account SA-68108, dated 7 May 2026.", "A single-page account closure procedure for new social media account SA-68108, dated 22 March 2026.", "A single-page account request form for new social media account SA-68108, dated 5 April 2026, signed by the requesting manager.", "A single-page naming convention approval for new social media account SA-68108, dated 19 May 2026, signed by the social media governance team lead.", "A single-page content escalation route for new social media account SA-68108, dated 25 April 2026, signed by the communications manager.", "A single-page two-factor authentication confirmation for new social media account RV-63161, dated 26 May 2026.", "A single-page platform terms acceptance record for new social media account SA-68108, dated 9 June 2026, signed by the account owner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 818}} {"id": "isc-te-00113-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Xanwald SAS", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "24 June 2026"}, "checklist": ["System pressure test results, issued within the last 1 months, signed", "If the system contains more than 5 tonnes of refrigerant, also: fixed leak detection test certificate, issued within the last 6 months, signed", "Plant room access sign-in sheet", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "Thermostat calibration certificate, issued within the last 12 months", "Asset condition photograph sheet, issued within the last 1 months"], "submission": {"case": {"name": "air conditioning system PS-44263", "reference": "MV-14815", "details": ["The system contains more than 5 tonnes of refrigerant."]}, "documents received": ["PS-44263_thermostat_calibration_certificate_160725.pdf. Thermostat calibration certificate for air conditioning system PS-44263, dated 16 July 2025. 1 page.", "PS-44263_engineer_F_gas_handling_certificate_20102028.pdf. Engineer F-gas handling certificate for air conditioning system PS-44263, showing an expiry date of 20 October 2028. 1 page.", "PS-44263_asset_condition_photograph_sheet_030626_v2.pdf. Asset condition photograph sheet for air conditioning system PS-44263, dated 3 June 2026. Pages 1-1 of 2 are included, so only 1 of its 2 pages is in the pack.", "PS-44263_fixed_leak_detection_test_certificate_010226.pdf. Fixed leak detection test certificate for air conditioning system PS-44263, dated 1 February 2026. 2 pages, complete. Signed by the leak detection engineer.", "PS-44263_system_pressure_test_results_070626.pdf. System pressure test results for air conditioning system PS-44263, dated 7 June 2026. 2 pages, complete. Signed by the commissioning engineer.", "PS-44263_refrigerant_top_up_log_140626.pdf. Refrigerant top-up log for air conditioning system PS-44263, dated 14 June 2026. 1 page. Signed by the attending refrigeration engineer.", "PS-44263_plant_room_access_sign_in_sheet_120526.pdf. Plant room access sign-in sheet for air conditioning system PS-44263, dated 12 May 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1016}} {"id": "isc-te-00263-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Gravton GmbH", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "20 March 2026"}, "checklist": ["Remediation items list, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Alerting rules review note, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months, signed.", "Customer impact statement, issued within the last 3 months."], "submission": {"case": {"name": "production incident UI-22644", "reference": "SZ-62023"}, "documents received": ["Alerting rules review note for production incident UI-22644. Date of issue: 18 January 2026. 2 pages, complete.", "Service level objective breach record for production incident UI-22644. Date of issue: 29 January 2026. Single page.", "Customer impact statement for production incident UI-22644. Date of issue: 18 February 2026. 2 pages, complete.", "Follow-up owner assignment sheet for production incident UI-22644. Date of issue: 18 January 2026. Single page. The signature line is empty; it is not signed.", "Postmortem meeting minutes for production incident UI-22644. Date of issue: 7 January 2026. 3 pages, complete. Signed by the incident postmortem chair.", "Incident timeline for production incident UI-22644. Date of issue: 1 March 2026. 3 pages, complete.", "Remediation items list for production incident UI-22644. Date of issue: 5 January 2026. 2 pages, complete. Signed by the reliability engineering lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 820}} {"id": "isc-te-00144-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Merswood Inc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "29 May 2026"}, "checklist": ["If the account will be run by an external agency, also: agency access agreement (signed)", "admin access list (issued within the last 3 months)", "account purpose statement", "platform terms acceptance record (signed)", "two-factor authentication confirmation (issued within the last 3 months)", "content escalation route (signed)"], "submission": {"case": {"name": "new social media account FY-24531", "reference": "QP-40875", "details": ["The account will be run by an external agency."]}, "cover note": "Please find the pack for new social media account FY-24531 attached for your review. Everything needed is attached and complete. Many thanks, Eilidh Ebbnall", "documents received": ["Account purpose statement, new social media account FY-24531. Date of issue: 30 April 2026. It is a single page.", "Two-factor authentication confirmation, new social media account FY-24531. Date of issue: 15 May 2026. It is a single page.", "Content escalation route, new social media account FY-24531. Date of issue: 17 February 2026. It is a single page. It is signed by the Social Media Governance Lead.", "Admin access list, new social media account FY-24531. Date of issue: 12 March 2026. It is a single page.", "Platform terms acceptance record, new social media account FY-24531. Date of issue: 20 February 2026. It is a single page. It is signed by the Social Media Governance Lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete relative to the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-35", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 792}} {"id": "isc-te-00479-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Oxlwater Partners", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "27 March 2026"}, "checklist": ["Current working pattern statement, issued within the last 3 months.", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed.", "Proposed working pattern plan, signed.", "Line manager opinion note, issued within the last 2 months, signed.", "Client or service impact statement, signed.", "Impact assessment on the team, signed.", "Trial period proposal, signed."], "submission": {"case": {"name": "Rory Ustins", "reference": "JA-54555"}, "documents received": ["Line manager opinion note - Rory Ustins.pdf. This is a line manager opinion note about Rory Ustins, showing its date of issue as 10 February 2026. It runs to 2 pages, complete, and is signed by the line manager.", "Current working pattern statement - Rory Ustins.pdf. This is a current working pattern statement about Rory Ustins, showing its date of issue as 6 March 2026. It is a single page.", "Impact assessment on the team - Rory Ustins.pdf. This is an impact assessment on the team about Rory Ustins, showing its date of issue as 27 December 2025. It runs to 3 pages, complete, and is signed by the line manager.", "Previous flexible working requests record - Rory Ustins.pdf. This is a previous flexible working requests record about Rory Ustins, showing its date of issue as 6 July 2025. It is a single page.", "Proposed working pattern plan - Rory Ustins.pdf. This is a proposed working pattern plan about Rory Ustins, showing its date of issue as 4 February 2026. It runs to 2 pages, complete, and is signed by the employee.", "Caring responsibilities statement - Rory Ustins.pdf. This is a caring responsibilities statement about Rory Ustins, showing its date of issue as 28 January 2026. It is a single page, signed by the employee.", "Client or service impact statement - Rory Ustins.pdf. This is a client or service impact statement about Rory Ustins, showing its date of issue as 7 January 2026. It is a single page, signed by the line manager.", "Trial period proposal - Rory Ustins.pdf. This is a trial period proposal about Rory Ustins, showing its date of issue as 18 March 2026. It is a single page, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 957}} {"id": "isc-te-00457-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Kenvdale BV", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "16 June 2026"}, "checklist": ["If the requested advance is above the standard advance limit, also: finance director approval for the higher advance (signed)", "Travel advance request form (signed)", "Travel policy extract showing advance eligibility", "Costed trip estimate sheet (issued within the last 3 months, signed)", "Line manager approval for the advance (signed)", "Trip itinerary and approval (issued within the last 3 months, signed)", "Payroll deduction agreement for recovery of the advance (signed)"], "submission": {"case": {"name": "Orla Natfield", "reference": "LZ-40963", "details": ["The requested advance is above the standard advance limit."]}, "cover note": "Everything needed for reference LZ-40963 is attached and complete. Please review the pack at your convenience. Emily Clemsall", "documents received": ["Costed trip estimate sheet - Orla Natfield - 22 May 2026.pdf. A costed trip estimate sheet relating to Orla Natfield, dated 22 May 2026. It is 1 page and signed by the employee.", "Travel advance request form - Orla Natfield - 2 May 2026.pdf. A travel advance request form relating to Orla Natfield, dated 2 May 2026. It is 1 page and signed by the employee.", "Line manager approval - Orla Natfield - 25 February 2026.pdf. A line manager approval for the advance relating to Orla Natfield, dated 25 February 2026. It is 1 page and signed by the line manager.", "Payroll deduction agreement - Orla Natfield - 31 May 2026.pdf. A payroll deduction agreement for recovery of the advance relating to Orla Natfield, dated 31 May 2026. It is 1 page and signed by the employee.", "Travel policy extract - Orla Natfield - 28 February 2026.pdf. A travel policy extract showing advance eligibility relating to Orla Natfield, dated 28 February 2026. It is 1 page.", "Trip itinerary and approval - Orla Natfield - 11 March 2026.pdf. A trip itinerary and approval relating to Orla Natfield, dated 11 March 2026. It is 2 pages, complete, and signed by the line manager.", "FD approval higher advance - Orla Natfield - 4 March 2026.pdf. A finance director approval for the higher advance relating to Orla Natfield, dated 4 March 2026. It is 1 page and carries the signature of the finance director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1011}} {"id": "isc-te-00095-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Maldcrest Limited", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "25 June 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed", "Travel policy extract showing advance eligibility", "Employee bank detail confirmation, issued within the last 6 months and signed", "Line manager approval for the advance, signed", "Costed trip estimate sheet, issued within the last 3 months and signed", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Omar Ebbski", "reference": "GH-37714"}, "documents received": ["Payroll deduction agreement for recovery of the advance for Omar Ebbski. Date of issue: 7 April 2026. 1 page. Signed by the employee.", "Trip itinerary and approval for Omar Ebbski. Date of issue: 23 April 2026. 2 pages, complete. Signed by the line manager.", "Employee bank detail confirmation for Omar Ebbski. Date of issue: 6 January 2026. 1 page. Signed by the employee.", "Travel policy extract showing advance eligibility for Omar Ebbski. Date of issue: 21 May 2026. 1 page.", "Costed trip estimate sheet for Omar Ebbski. Date of issue: 15 May 2026. 1 page. Signed by the line manager.", "Outstanding advance clearance check for Omar Ebbski. Date of issue: 5 June 2026. 1 page. Signed by the accounts payable team lead.", "Line manager approval for the advance for Omar Ebbski. Date of issue: 4 March 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack meets the checklist. Go line by line through the checklist, covering every line relevant to this case. To count, a required document must be of the kind listed on the checklist (not a similar one), be about the subject of the case, have all its pages present, be signed wherever the checklist calls for a signature, not be expired on the date of the review, and fall within the issue period the checklist allows. A conditional line applies only when its circumstance is true for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: one or more applicable lines are not satisfied. unclear: no applicable line is clearly unmet, yet at least one cannot be determined from what is shown, such as a needed date, signature or page count being not visible, a document's kind being impossible to tell, or the case details not stating whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels can mislead; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-37", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 793}} {"id": "isc-te-00083-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Pravholm SAS", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "23 March 2026"}, "checklist": ["Confirm the pack contains a localisation completeness report issued within the last 1 months.", "Confirm the pack contains a store listing description issued within the last 1 months.", "Confirm the pack contains a crash-free rate report issued within the last 1 months.", "Confirm the pack contains a privacy policy update issued within the last 3 months.", "If the mobile app release adds a new payment feature, also confirm the pack contains a payment provider compliance checklist issued within the last 3 months and signed.", "Confirm the pack contains a marketing screenshot pack.", "If the mobile app release includes third-party analytics, also confirm the pack contains an analytics data consent statement issued within the last 3 months and signed.", "Confirm the pack contains an age rating questionnaire that is signed."], "submission": {"case": {"name": "mobile app release QZ-19484", "reference": "HT-41661", "details": ["The mobile app release adds a new payment feature.", "The mobile app release includes no third-party analytics."]}, "documents received": ["Marketing screenshot pack, mobile app release QZ-19484. Date of issue: 17 March 2026. 6 pages, complete.", "Crash-free rate report, mobile app release QZ-19484. Date of issue: 18 March 2026. Single page.", "Payment provider compliance checklist, mobile app release QZ-19484. Date of issue: 11 February 2026. 3 pages, complete. Signed by the team lead.", "Store listing description, mobile app release QZ-19484. Date of issue: 7 March 2026. Single page.", "Privacy policy update, mobile app release QZ-19484. Date of issue: 7 January 2026. 2 pages, complete.", "Localisation completeness report, mobile app release QZ-19484. Date of issue: 12 March 2026. 2 pages, complete.", "Age rating questionnaire, mobile app release QZ-19484. Date of issue: 14 February 2026. 2 pages, complete. The signature block on the last page is covered by a sticky note, so it cannot be seen whether the document is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 930}} {"id": "isc-te-00181-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Wynstead Inc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "26 May 2026"}, "checklist": ["Leaver notification form, signed", "Shared mailbox handover record, issued within the last 1 month, signed", "Service desk ticket closure summary, issued within the last 1 month", "Line manager confirmation, issued within the last 1 month, signed", "Final payroll cut-off note, issued within the last 1 month, signed"], "submission": {"case": {"name": "James Fitzford", "reference": "IF-45020"}, "cover note": "Could you approve this pack as soon as possible? All the paperwork is in order.", "documents received": ["leaver_notification_form.pdf. This leaver notification form for James Fitzford is dated 1 February 2026 and runs to 2 pages, complete. It is signed by the line manager.", "shared_mailbox_handover_record.pdf. This shared mailbox handover record for James Fitzford is dated 12 May 2026 and runs to 2 pages, complete. It is signed by the shared mailbox owner.", "service_desk_ticket_closure_summary.pdf. This service desk ticket closure summary for James Fitzford is dated 13 May 2026 and runs to 3 pages, complete.", "final_payroll_cutoff_note.pdf. This final payroll cut-off note for James Fitzford is dated 8 May 2026 and is a single page. It is signed by the payroll officer.", "access_rights_inventory.pdf. This access rights inventory for James Fitzford is dated 19 May 2026 and runs to 4 pages, complete.", "line_manager_confirmation_sofia_holtford.pdf. This line manager confirmation is for Sofia Holtford and is dated 20 May 2026; it is a single page. It is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 801}} {"id": "isc-te-00076-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Boltshaw LLP", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "13 July 2026"}, "checklist": ["Check the payment gateway technical specification is present in the pack.", "Check the data protection impact assessment is present in the pack, that it was issued within the last 12 months, and that it is signed.", "Check the fraud screening configuration sheet is present in the pack and that it is signed.", "Check the go-live sign-off certificate is present in the pack, that it was issued within the last 1 months, and that it is signed.", "If the gateway will handle recurring subscription payments, also check the subscription billing mandate template is present in the pack and that it is signed.", "Check the test environment transaction log is present in the pack and that it was issued within the last 1 months."], "submission": {"case": {"name": "payment gateway UG-10911", "reference": "RD-95415", "details": ["The gateway will not handle recurring subscription payments."]}, "documents received": ["Data protection impact assessment for payment gateway UG-10911, dated 22 January 2026. It is signed by the Data Protection Officer. 5 pages, complete.", "Live sales report from the online store for payment gateway UG-10911, dated 3 July 2026. 4 pages, complete.", "Go-live sign-off certificate for payment gateway UG-10911, dated 1 July 2026. It is signed by the Payments Team Lead. 1 page.", "Fraud screening configuration sheet for payment gateway UG-10911, dated 26 May 2026. It is signed by the Fraud Screening Lead. 1 page.", "File 7743.pdf: the scan is blank, so its contents cannot be seen.", "Payment gateway technical specification for payment gateway UG-10911, dated 10 May 2026. 8 pages, complete.", "Test environment transaction log for payment gateway UG-10911, dated 3 July 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00260-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Baxcrest SAS", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "1 May 2026"}, "checklist": ["Alternatives considered table", "Cost estimate sheet, issued within the last 6 months", "Capacity and load estimate, issued within the last 6 months", "Migration and rollout plan", "Proposed architecture diagram"], "submission": {"case": {"name": "design document UZ-54491", "reference": "GO-74704"}, "cover note": "Please accept my apologies that this pack was put together in a rush.", "documents received": ["uz54491_cost_estimate_sheet.pdf - Cost estimate sheet for design document UZ-54491. Date of issue: 13 February 2026. 2 pages, complete.", "uz54491_capacity_and_load_estimate.pdf - Capacity and load estimate for design document UZ-54491. Date of issue: 20 December 2025. 3 pages, complete.", "uz54491_proposed_architecture_diagram.pdf - Proposed architecture diagram for design document UZ-54491. Date of issue: 2 February 2026. Single page.", "uz54491_alternatives_considered_table.pdf - Alternatives considered table for design document UZ-54491. Date of issue: 8 January 2026. 2 pages, complete.", "uz54491_migration_and_rollout_plan.pdf - Migration and rollout plan for design document UZ-54491. Date of issue: 12 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 758}} {"id": "isc-te-00207-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Crancombe Inc", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "4 August 2026"}, "checklist": ["Leave balance statement, issued within the last 3 months", "If the leave requested is longer than two weeks, also: extended absence cover plan (signed)", "Handover note (signed)", "Team holiday planner extract", "Contact plan for time away", "Return to work date confirmation", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave (signed)"], "submission": {"case": {"name": "Femke Grubwick", "reference": "MF-51224", "details": ["The leave requested is longer than two weeks.", "The employee is requesting leave during a known busy period."]}, "documents received": ["handover_note_MF-51224.pdf. Handover note for Femke Grubwick, dated 23 July 2026. 2 pages, complete; signed by the line manager.", "team_holiday_planner_extract_MF-51224.pdf. Team holiday planner extract for Femke Grubwick, dated 8 June 2026. 2 pages, complete.", "return_to_work_date_confirmation_MF-51224.pdf. Return to work date confirmation for Femke Grubwick, dated 4 May 2026. 1 page.", "annual_leave_request_form_MF-51224.pdf. Completed annual leave request form for Femke Grubwick, dated 26 May 2026. 1 page; signed by the employee.", "contact_plan_for_time_away_MF-51224.pdf. Contact plan for time away for Femke Grubwick, dated 27 June 2026. 1 page.", "leave_balance_statement_MF-51224_v2.pdf. Leave balance statement for Femke Grubwick, dated 14 May 2026. 1 page.", "business_case_for_peak_period_leave_MF-51224.pdf. Business case for peak-period leave for Femke Grubwick, dated 13 May 2026. 2 pages, complete; signed by the line manager.", "extended_absence_cover_plan_MF-51224.pdf. Extended absence cover plan for Femke Grubwick, dated 16 July 2026. 3 pages, complete; signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 928}} {"id": "isc-te-00247-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Faldmont GmbH", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "27 April 2026"}, "checklist": ["Rent book or rent payment schedule issued within the last 2 months.", "Benefit claim form that is valid, not expired, on the date of the review, signed.", "Current tenancy agreement, signed.", "Proof of identity that is valid, not expired, on the date of the review."], "submission": {"case": {"name": "Simon Holtani", "reference": "HP-46378"}, "documents received": ["Rent book or rent payment schedule. The document is about Simon Holtani and shows its date of issue as 4 April 2026. 4 pages, complete.", "Recent bank statements. The statements are about Simon Holtani and show their date of issue as 8 April 2026. 12 pages, complete.", "Benefit claim form. The form is about Simon Holtani, but the date on it cannot be seen as it is smudged. 12 pages, complete. It is signed by the claimant.", "Current tenancy agreement. The agreement is about Simon Holtani and shows its date of issue as 27 March 2026. 12 pages, complete. It is signed by the landlord.", "Proof of identity. The document is about Simon Holtani and shows its expiry date as 4 July 2027. It is a single page."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack satisfies the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "expired", "defect": "date not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-66", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 702}} {"id": "isc-te-00235-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Tarvcliff plc", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "1 June 2026"}, "checklist": ["Check for proof of deposit savings, issued within the last 3 months.", "Check for mortgage application form, issued within the last 3 months and signed.", "Check for property valuation report, issued within the last 3 months and signed.", "Check for gifted deposit letter, issued within the last 3 months and signed.", "If the property being bought is a flat in a shared building, also check for management company pack, issued within the last 3 months."], "submission": {"case": {"name": "Pablo Drumsall", "reference": "TQ-86071", "details": ["The property being bought is a flat in a shared building."]}, "documents received": ["Proof of deposit savings. Statement in the name of Pablo Drumsall. Date of issue: 25 March 2026. 2 pages, complete.", "Mortgage application form. Application in the name of Pablo Drumsall. Date of issue: 3 April 2026. 10 pages, complete. Signed by the borrower.", "Gifted deposit letter. Letter regarding Pablo Drumsall. Date of issue: 17 May 2026. 1 page. Signed by the giftor.", "P60 tax summary. P60 in the name of Pablo Drumsall. Date of issue: 10 July 2025. 2 pages, complete.", "Management company pack. Pack for the property being bought by Pablo Drumsall. Date of issue: 22 March 20217. 12 pages, complete.", "Three months of bank statements. Statements for Pablo Drumsall. Date of issue: 3 May 2026. 9 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00260-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Baxcrest SAS", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "1 May 2026"}, "checklist": ["Alternatives considered table", "Cost estimate sheet, issued within the last 6 months", "Capacity and load estimate, issued within the last 6 months", "Migration and rollout plan", "Proposed architecture diagram"], "submission": {"case": {"name": "design document UZ-54491", "reference": "GO-74704"}, "documents received": ["uz54491_proposed_architecture_diagram.pdf - Proposed architecture diagram for design document UZ-54491. Date of issue: 2 February 2026. Single page.", "uz54491_capacity_and_load_estimate.pdf - Capacity and load estimate for design document UZ-54491. Date of issue: 20 December 2025. 3 pages, complete.", "uz54491_cost_estimate_sheet.pdf - Cost estimate sheet for design document UZ-54491. Date of issue: 13 February 2026. 2 pages, complete.", "uz54491_migration_and_rollout_plan.pdf - Migration and rollout plan for design document UZ-54491. Date of issue: 12 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 689}} {"id": "isc-te-00422-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pentridge Ltd", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "1 May 2026"}, "checklist": ["Supplier response letter, issued within the last 3 months and signed", "Contract compliance checklist, signed", "Quality inspection report, issued within the last 6 months and signed", "If the supplier is being considered for an expanded scope, also: expanded scope assessment memo, signed", "Invoice discrepancy log", "Delivery record summary, issued within the last 12 months"], "submission": {"case": {"name": "Lombcombe BV", "reference": "RE-90972", "details": ["The supplier's scope is staying the same."]}, "cover note": "Please accept my apologies that this pack was put together in a rush. Camille Vellingham", "documents received": ["Quality inspection report for Lombcombe BV, dated 24 April 2026. 3 pages, complete. Signed by the quality inspector.", "Invoice discrepancy log for Lombcombe BV, dated 1 January 2026. 2 pages, complete.", "Delivery record summary for Lombcombe BV, dated 7 January 2026. 2 pages, complete.", "Supplier response letter for Lombcombe BV, dated 17 April 2025. A single page, signed by the supplier's account manager.", "Supplier response letter for Lombcombe BV, dated 9 February 2026. A single page, signed by the supplier's account manager.", "Contract compliance checklist for Lombcombe BV, dated 5 January 2026. 3 pages, complete. Signed by the procurement lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 738}} {"id": "isc-te-00341-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Dundcombe Group", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "7 May 2026"}, "checklist": ["Cost-benefit justification is attached", "Equipment purchase request form is attached, signed", "Vendor quotation is attached, issued within the last 3 months", "Training needs assessment is attached, signed", "Maintenance plan is attached"], "submission": {"case": {"name": "equipment BU-49803", "reference": "HE-68114"}, "cover note": "Please could you approve this pack quickly, as all the paperwork is in order. Thomas Kipaker", "documents received": ["Vendor quotation for equipment BU-49803, dated 21 April 2026. 2 pages, complete.", "A budget spreadsheet for the whole department covering equipment BU-49803, dated 16 April 2026. 3 pages, complete.", "Equipment purchase request form for equipment BU-49803, dated 11 February 2026. 2 pages, complete. Signed by the requesting department head.", "Training needs assessment for equipment BU-49803, dated 5 April 2026. A single page. Signed by the training coordinator.", "Maintenance plan for equipment BU-49803, dated 19 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 691}} {"id": "isc-te-00078-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Dundwyn Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "4 June 2026"}, "checklist": ["Confirm the marketing consent form is present and signed.", "Confirm the customer contact details sheet is present and signed.", "Confirm the loyalty scheme enrolment form is present and signed.", "If the customer is joining as a household account with a shared card, also: confirm the household member details form is present and signed.", "Confirm the initial points balance statement is present and was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also: confirm the points transfer evidence statement is present, was issued within the last 3 months, and is signed."], "submission": {"case": {"name": "Camille Plumopoulos", "reference": "BU-34218", "details": ["The customer is joining as a single-person account.", "The customer is transferring points from a rival scheme."]}, "documents received": ["loyalty_scheme_enrolment_form_plumopoulos_1may2026.pdf: A single-page loyalty scheme enrolment form about Camille Plumopoulos, dated 1 May 2026. The enrolment form has been signed by the customer.", "initial_points_balance_statement_plumopoulos_21march2026.pdf: A single-page initial points balance statement about Camille Plumopoulos, dated 21 March 2026. The statement shows the starting points balance for the new loyalty account.", "terms_and_conditions_acceptance_sheet_plumopoulos_15february2026.pdf: A single-page terms and conditions acceptance sheet about Camille Plumopoulos, dated 15 February 2026. The sheet has been signed by the customer.", "marketing_consent_form_plumopoulos_31march2026.pdf: A single-page marketing consent form about Camille Plumopoulos, dated 31 March 2026. The signature line is empty, so the form is not signed.", "customer_contact_details_sheet_plumopoulos_30may2026.pdf: A single-page customer contact details sheet about Camille Plumopoulos, dated 30 May 2026. The sheet carries the customer's signature.", "points_transfer_evidence_statement_plumopoulos_23may2026.pdf: a single-page points transfer evidence statement about Camille Plumopoulos, dated 23 May 2026. The statement has been signed by the rival scheme administrator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 924}} {"id": "isc-te-00425-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Zervstead plc", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "7 April 2026"}, "checklist": ["Support plan, signed", "Proof of identity, valid (not expired) on the date of the review", "Needs assessment report, signed", "Safeguarding referral form, issued within the last 12 months, signed", "If the adult owns property that could be considered in the financial assessment, also: property valuation report, issued within the last 12 months, signed", "Benefit entitlement letters, issued within the last 12 months"], "submission": {"case": {"name": "Emre Brodett", "reference": "QM-52065", "details": ["The adult does not own property that could be considered in the financial assessment."]}, "documents received": ["Safeguarding referral form - Emre Brodett. The form is dated 16 November 2025. 2 pages, complete. It is signed by the safeguarding lead.", "Support plan - Emre Brodett. The plan is dated 27 January 2026. 6 pages, complete. It is signed by the support planner.", "Benefit entitlement letters - Emre Brodett. The letters are dated 22 November 2025. 2 pages, complete.", "Needs assessment report - Emre Brodett. The report is dated 27 January 2026. 12 pages, complete. It is signed by the assessing social worker.", "Proof of identity - Emre Brodett. The document shows an expiry date of 21 September 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 758}} {"id": "isc-te-00103-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Pravness plc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "12 March 2026"}, "checklist": ["If the company operates in a cash-intensive trade, also: cash handling policy (signed)", "company tax registration certificate", "authorised signer identity document (valid (not expired) on the date of the review)", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents", "company statutes (signed)", "certificate of incorporation", "beneficial owner identification form (signed)", "shareholder register extract (issued within the last 3 months)"], "submission": {"case": {"name": "Maldwald LLP", "reference": "NL-50519", "details": ["The company does not operate in a cash-intensive trade.", "All beneficial owners of the company are residents."]}, "documents received": ["Company tax registration certificate for Maldwald LLP, dated 18 December 2025. Single page.", "Certificate of incorporation for Maldwald LLP, dated 13 January 2026. Single page.", "File scan_0012.pdf: the file will not open, so the contents cannot be seen.", "Shareholder register extract for Maldwald LLP, dated 5 February 2026. 2 pages, complete.", "Company statutes for Maldwald LLP, dated 24 January 2026. 12 pages, complete. Signed by a managing partner.", "Board resolution to open the account for Maldwald LLP, dated 14 December 2025. Single page. Signed by the chair of the board.", "Beneficial owner identification form for Maldwald LLP, dated 11 February 2026. 3 pages, complete. Signed by a beneficial owner.", "Authorised signer identity document for Maldwald LLP, showing an expiry date of 9 January 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00044-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Abrmouth Partners", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "2 April 2026"}, "checklist": ["Utilities connection certificate on file.", "Warehouse insurance policy on file, valid (not expired) on the date of the review.", "Planning permission on file.", "Signed lease agreement on file, signed.", "Racking inspection report on file, issued within the last 12 months and signed.", "If the warehouse site is in a flood risk area, also: flood risk assessment, signed.", "Fire safety certificate on file, valid (not expired) on the date of the review."], "submission": {"case": {"name": "warehouse UE-7753", "reference": "YO-81533"}, "documents received": ["Floor load capacity report for warehouse UE-7753. Date of issue: 9 February 2026. 3 pages, complete. Signed by the structural engineer.", "Racking inspection report for warehouse UE-7753. Date of issue: 12 July 2025. 2 pages, complete. Signed by the racking inspector.", "Signed lease agreement for warehouse UE-7753. Date of issue: 6 January 2026. 8 pages, complete. Signed by the landlord and the tenant.", "Fire safety certificate for warehouse UE-7753. Expiry date: 29 November 2026. 2 pages, complete.", "Warehouse insurance policy for warehouse UE-7753. Expiry date: 14 April 2027. 6 pages, complete.", "Utilities connection certificate for warehouse UE-7753. Date of issue: 8 December 2025. Single page.", "Planning permission for warehouse UE-7753. Date of issue: 24 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack meets the checklist. Go line by line through the checklist, covering every line relevant to this case. To count, a required document must be of the kind listed on the checklist (not a similar one), be about the subject of the case, have all its pages present, be signed wherever the checklist calls for a signature, not be expired on the date of the review, and fall within the issue period the checklist allows. A conditional line applies only when its circumstance is true for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: one or more applicable lines are not satisfied. unclear: no applicable line is clearly unmet, yet at least one cannot be determined from what is shown, such as a needed date, signature or page count being not visible, a document's kind being impossible to tell, or the case details not stating whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels can mislead; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-37", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 812}} {"id": "isc-te-00063-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ivrby Partners", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "15 July 2026"}, "checklist": ["Certificate of insurance, valid (not expired) on the date of the review.", "Supplier registration form, signed.", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed.", "Bank details confirmation letter, issued within the last 3 months, signed.", "Anti-bribery policy statement, signed.", "Company tax clearance certificate, valid (not expired) on the date of the review.", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid (not expired) on the date of the review."], "submission": {"case": {"name": "Corvcrest Ltd", "reference": "QW-68059", "details": ["The supplier is a domestic company.", "The supplier is a small business with a single owner."]}, "documents received": ["Copy of the owner's photo identification for Corvcrest Ltd. It shows an expiry date of 9 February 2028 and is a single page.", "Certificate of insurance for Corvcrest Ltd. It shows an expiry date of 18 July 2028. Pages 1-1 of 2 are included.", "Bank details confirmation letter for Corvcrest Ltd. It is dated 20 June 2026, is a single page, and is signed by the supplier's finance manager.", "Supplier registration form for Corvcrest Ltd. It is dated 24 April 2026 and is signed by an authorised representative of the supplier. 3 pages, complete.", "Anti-bribery policy statement for Corvcrest Ltd. It is dated 22 June 2026 and is signed by an authorised representative of the supplier. 2 pages, complete.", "Company tax clearance certificate for Corvcrest Ltd. It shows an expiry date of 29 December 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 824}} {"id": "isc-te-00393-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Heskbrook Inc", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "3 April 2026"}, "checklist": ["If the property is a listed building, also: listed building consent for the repairs (signed)", "If the flood water reached the upper floor of the property, also: upper floor damage schedule (signed)", "debris removal invoice (issued within the last 6 months)", "buildings insurance policy schedule", "utility supplier's letter confirming the supply was cut off (issued within the last 12 months)", "council flood warning notice (issued within the last 12 months)", "flood claim form (signed)", "drying contractor's certificate of completion (issued within the last 6 months, signed)"], "submission": {"case": {"name": "property RN-72349", "reference": "ME-41465", "details": ["The property is a listed building.", "The flood water reached the upper floor of the property."]}, "documents received": ["Upper floor damage schedule. Dated 21 December 2025 and relating to property RN-72349. 3 pages, complete. Signed by the loss adjuster.", "Listed building consent for the repairs. Dated 25 February 2026 and relating to property RN-72349. 2 pages, complete. Signed by the listed building consent officer.", "Photographs of flood water in the rooms. Dated 27 March 2026 and relating to property RN-72349. 3 pages, complete.", "Drying contractor's certificate of completion. Dated 9 January 2026 and relating to property RN-72349. 2 pages, complete. Signed by the drying contractor.", "Flood claim form. Dated 30 January 2026 and relating to property RN-72349. Pages 1-3 of 5. Signed by the policyholder.", "Council flood warning notice. Dated 5 June 2025 and relating to property RN-72349. 1 page.", "Debris removal invoice. Dated 17 November 2025 and relating to property RN-72349. 1 page.", "Buildings insurance policy schedule. Dated 3 March 2026 and relating to property RN-72349. 5 pages, complete.", "Utility supplier's letter confirming the supply was cut off. Dated 2 May 2025 and relating to property RN-72349. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "pages missing", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 957}} {"id": "isc-te-00460-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Cindhaven Limited", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "17 September 2026"}, "checklist": ["Check that a signed board resolution to open the account is included.", "Check that the certificate of incorporation is included.", "Check that proof of registered office address is included, issued within the last 3 months.", "Check that the signed company statutes are included.", "Check that a shareholder register extract is included, issued within the last 3 months.", "Check that the company tax registration certificate is included.", "If the company has a non-resident beneficial owner, also check that the apostilled incorporation documents are included."], "submission": {"case": {"name": "Urvlund Partners", "reference": "YW-82009", "details": ["The company has a non-resident beneficial owner."]}, "documents received": ["Scanned shareholder register extract for Urvlund Partners, dated 17 August 2026. 2 pages, complete.", "Scanned apostilled incorporation documents for Urvlund Partners, dated 7 July 2026. 4 pages, complete.", "Scanned certificate of incorporation for Urvlund Partners, dated 15 August 2026. Single page.", "Scanned proof of registered office address for Urvlund Partners, dated 8 July 2026. Single page.", "Scanned company statutes for Urvlund Partners, dated 1 August 2026. 12 pages, complete, signed by the secretary.", "Scanned company tax registration certificate for Urvlund Partners, dated 9 August 2026. Single page.", "Scanned board resolution to open the account for Urvlund Partners, dated 21 May 2026. Single page, signed by the chair of the board."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 776}} {"id": "isc-te-00356-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Orrford SAS", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "31 March 2026"}, "checklist": ["Booking voucher, issued within the last 6 months.", "Driving licence, valid (not expired) on the date of the review, signed.", "Fuel policy sheet, signed.", "Credit card in the driver's name, valid (not expired) on the date of the review, signed.", "Insurance excess waiver certificate, valid (not expired) on the date of the review."], "submission": {"case": {"name": "Zofia Ingova", "reference": "SN-55445"}, "cover note": "Please accept my apologies for this pack being put together in a rush.", "documents received": ["Insurance excess waiver certificate for Zofia Ingova, expiring 26 October 2027. 2 pages, complete.", "Fuel policy sheet for Zofia Ingova, dated 28 January 2026. One page. Signed by the driver.", "Credit card in the driver's name for Zofia Ingova, expiring 14 September 2028. One page. Signed by the cardholder.", "File scan_ref_07. The file will not open, so its contents cannot be seen.", "Booking voucher for Zofia Ingova, dated 23 November 2025. One page.", "Prepaid gift card bought from a shop for Zofia Ingova, expiring 14 September 2028. One page. Signed by the cardholder.", "Driving licence for Zofia Ingova, expiring 16 May 2027. 2 pages, complete. Signed by the licence holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 761}} {"id": "isc-te-00209-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Corvley Limited", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "29 May 2026"}, "checklist": ["Check that the proposed working pattern plan is included and signed.", "Check that the flexible working request form is included and signed.", "Check that the impact assessment on the team is included and signed.", "If the employee has caring responsibilities for a dependent, also: check that the caring responsibilities statement is included and signed.", "Check that the trial period proposal is included and signed."], "submission": {"case": {"name": "Harry Holtisey", "reference": "NC-90327", "details": ["The employee has caring responsibilities for a dependent."]}, "documents received": ["A file named scan_0427.pdf, dated 29 May 2026. Single page. The scan is too faint to read, so its contents cannot be seen.", "A caring responsibilities statement concerning Harry Holtisey, dated 14 February 2026. Single page. Signed by Harry Holtisey.", "A trial period proposal concerning Harry Holtisey, dated 7 April 2026. Single page. Signed by the line manager.", "A flexible working request form concerning Harry Holtisey, dated 23 February 2026. 3 pages, complete. Signed by Harry Holtisey.", "A proposed working pattern plan concerning Harry Holtisey, dated 4 May 2026. 2 pages, complete. Signed by the line manager.", "An impact assessment on the team concerning Harry Holtisey, dated 1 February 2026. 3 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "document present (circumstance holds), plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 746}} {"id": "isc-te-00005-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ulmmoor LLP", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "6 May 2026"}, "checklist": ["Costed trip estimate sheet, issued within the last 3 months and signed", "Outstanding advance clearance check, signed", "Travel policy extract showing advance eligibility", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Marco Mundridge", "reference": "RH-30807"}, "documents received": ["Payroll Deduction Agreement for Recovery of the Advance. This single-page payroll deduction agreement covering recovery of the advance for Marco Mundridge is dated 20 April 2026 and bears the employee's signature.", "Costed Trip Estimate Sheet. This single-page costed trip estimate sheet for Marco Mundridge is dated 23 March 2026 and carries the signature of the estimating clerk who prepared it.", "Travel Advance Request Form. This single-page travel advance request form for Marco Mundridge is dated 13 April 2026 and is signed by the requesting employee.", "Outstanding Advance Clearance Check. This single-page outstanding advance clearance check for Marco Mundridge is dated 13 April 2026 and is signed by the accounts payable reviewer.", "Line Manager Approval. This single-page line manager approval for the advance for Marco Mundridge is dated 23 March 2026 and carries the line manager's signature."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 691}} {"id": "isc-te-00492-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Creskdale plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "4 March 2026"}, "checklist": ["Trade account application form, signed", "Credit reference agency report issued within the last 3 months", "Company registration certificate", "Credit limit approval memo issued within the last 1 months and signed", "If the customer requests a credit limit above the standard cap, also: finance director sanction letter issued within the last 1 months and signed"], "submission": {"case": {"name": "Dornmont LLP", "reference": "TD-47006", "details": ["The customer requests a credit limit above the standard cap."]}, "cover note": "I have attached the pack for Dornmont LLP, but I am not sure that everything needed is in there.", "documents received": ["Finance director sanction letter for Dornmont LLP, dated 18 February 2026. Single page. Signed by the finance director.", "Credit reference agency report on Dornmont LLP, dated 23 December 2025. 6 pages, complete.", "Trade account application form for Dornmont LLP, dated 1 January 2026. 3 pages, complete. Signed by the customer's authorised signatory.", "Credit limit approval memo for Dornmont LLP, dated 19 February 2026. Single page. Signed by the credit control manager.", "Company registration certificate for Dornmont LLP, dated 7 January 2026. 2 pages, complete.", "Credit reference agency report on Dornmont LLP, dated 26 July 2024. 6 pages, complete.", "Personal guarantee for Dornmont LLP, dated 22 February 2026. 2 pages, complete. Signed by the guarantor."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 789}} {"id": "isc-te-00196-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Ivrhaven Limited", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "3 August 2026"}, "checklist": ["Customer order history extract, issued within the last 6 months", "If the customer claims the item was not as described, also: product description screenshot archive, issued within the last 6 months", "Signature proof of delivery, issued within the last 6 months, signed", "Transaction record printout, issued within the last 3 months", "Customer account details page, issued within the last 3 months", "Terms of sale acceptance log, issued within the last 12 months"], "submission": {"case": {"name": "disputed transaction DD-99864", "reference": "FL-51485", "details": ["The customer claims the item was not as described."]}, "documents received": ["Signature proof of delivery for disputed transaction DD-99864. Date of issue: 19 March 2026. Single page. Signed by the delivery driver.", "Customer order history extract for disputed transaction DD-99864. Date of issue: 5 July 2026. 2 pages, complete.", "Social media profile page for disputed transaction DD-99864. Date of issue: 18 June 2026. Single page.", "Product description screenshot archive for disputed transaction DD-99864. Date of issue: 31 July 2026. 2 pages, complete.", "Terms of sale acceptance log for disputed transaction DD-99864. Date of issue: 5 June 2026. Single page.", "Transaction record printout for disputed transaction DD-99864. Date of issue: 12 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 776}} {"id": "isc-te-00416-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Ulmberg LLP", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "2 June 2026"}, "checklist": ["Insurance notification letter, issued within the last 6 months", "Meter reading photo, issued within the last 1 months", "Survey booking form, signed", "Grid connection application, issued within the last 12 months, signed", "Scaffolding agreement, signed", "Energy performance certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "roof UO-80504", "reference": "IC-49989"}, "documents received": ["scaffolding-agreement.pdf. This is a scaffolding agreement for roof UO-80504, dated 18 March 2026. 2 pages, complete. It is signed by the scaffolding contractor.", "insurance-notification-letter.pdf. This is a single-page insurance notification letter for roof UO-80504, dated 2 March 2026.", "meter-reading-photo.pdf. This is a single-page meter reading photo for roof UO-80504, dated 17 May 2026.", "energy-performance-certificate.pdf. This is an energy performance certificate for roof UO-80504 with an expiry date of 23 October 2026. 3 pages, complete.", "ladder-safety-leaflet.pdf. This is a ladder safety leaflet for roof UO-80504, dated 18 March 2026. 2 pages, complete. It is signed by the site supervisor.", "grid-connection-application.pdf. This is a grid connection application for roof UO-80504, dated 22 May 2026. 2 pages, complete. It is signed by the customer.", "survey-booking-form.pdf. This is a single-page survey booking form for roof UO-80504, dated 14 April 2026. It is signed by the customer.", "roof-structural-report.pdf. This is a roof structural report for roof UO-80504, dated 22 May 2026. 4 pages, complete. It is signed by the surveyor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 889}} {"id": "isc-te-00098-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Wynbury Inc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "6 May 2026"}, "checklist": ["Confirm the costed trip estimate sheet is present, was issued within the last 3 months, and is signed.", "If the requested advance is above the standard advance limit, also: confirm finance director approval for the higher advance is present and signed.", "If the trip involves travel to another country, also: confirm foreign travel authorisation from a director is present and signed.", "Confirm the outstanding advance clearance check is present and signed.", "Confirm the payroll deduction agreement for recovery of the advance is present and signed.", "Confirm the employee bank detail confirmation is present, was issued within the last 6 months, and is signed.", "Confirm the travel policy extract showing advance eligibility is present."], "submission": {"case": {"name": "Helen Tadton", "reference": "AX-34121", "details": ["The requested advance is within the standard advance limit.", "The trip involves travel to another country."]}, "cover note": "I am sorry that this pack was put together in a rush. Please let me know if you would like me to send anything again. Alice Thornow", "documents received": ["bank_detail_confirmation_Tadton.pdf. An employee bank detail confirmation for Helen Tadton, dated 25 November 2025, on a single page. It is signed by the payroll officer, Joss Abidemi.", "travel_policy_extract_Tadton.pdf. A travel policy extract showing advance eligibility, dated 19 January 2026, on a single page, relating to Helen Tadton.", "outstanding_advance_clearance_Tadton.pdf. An outstanding advance clearance check for Helen Tadton, dated 26 March 2026, on a single page. It is signed by the accounts payable reviewer, Morwen Delacourt.", "costed_trip_estimate_Tadton.pdf. A costed trip estimate sheet for Helen Tadton, dated 24 March 2026, on a single page. It is signed by the travelling employee, Helen Tadton.", "foreign_travel_authorisation_Tadton.pdf. A foreign travel authorisation from a director for Helen Tadton, dated 1 May 2026, on a single page. It is signed by the authorising director, Kavell Renner.", "payroll_deduction_agreement_Tadton_v3.pdf. A payroll deduction agreement for recovery of the advance for Helen Tadton, dated 2 April 2026, on a single page. It is signed by the travelling employee, Helen Tadton."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "partial", "defect": "signed", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 944}} {"id": "isc-te-00370-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Cindford BV", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "12 August 2026"}, "checklist": ["Employment certificate, issued within the last 1 months and signed", "Photo identity document, valid (not expired) on the date of the review", "Property valuation report, issued within the last 6 months and signed", "Bank statement, issued within the last 3 months", "Credit bureau report, issued within the last 1 months", "If the property is a new build, also: new build warranty certificate"], "submission": {"case": {"name": "property YV-75629", "reference": "EX-15818", "details": ["The property is a new build."]}, "cover note": "Please accept my apologies - this pack was put together in a rush.", "documents received": ["Property valuation report. It concerns property YV-75629 and shows its date of issue as 25 February 2026. It is 10 pages, complete, and signed by the valuer.", "Employment certificate. It concerns property YV-75629 and shows its date of issue as 28 July 2026. It is 1 page and signed by the applicant's employer.", "Credit bureau report. It concerns property YV-75629 and shows its date of issue as 22 July 2026. It is 4 pages, complete.", "New build warranty certificate. It concerns property YV-75629 and shows its date of issue as 27 June 2026. It is 3 pages, complete.", "Photo identity document. It concerns property YV-75629 and shows its expiry date as 4 November 2028. It is 1 page.", "Mortgage application form. It concerns property YV-75629 and shows its date of issue as 23 June 2026. It is 6 pages, complete, and signed by the applicant.", "Bank statement. It concerns property YV-75629 and shows its date of issue as 22 June 2026. It is 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 875}} {"id": "isc-te-00263-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Gravton GmbH", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "20 March 2026"}, "checklist": ["Remediation items list, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Alerting rules review note, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months, signed.", "Customer impact statement, issued within the last 3 months."], "submission": {"case": {"name": "production incident UI-22644", "reference": "SZ-62023"}, "cover note": "Could you please approve this quickly? All the paperwork is in order. Thanks, Tyler Ebbridge", "documents received": ["Alerting rules review note for production incident UI-22644. Date of issue: 18 January 2026. 2 pages, complete.", "Incident timeline for production incident UI-22644. Date of issue: 1 March 2026. 3 pages, complete.", "Customer impact statement for production incident UI-22644. Date of issue: 18 February 2026. 2 pages, complete.", "Follow-up owner assignment sheet for production incident UI-22644. Date of issue: 18 January 2026. Single page. The signature line is empty; it is not signed.", "Remediation items list for production incident UI-22644. Date of issue: 5 January 2026. 2 pages, complete. Signed by the reliability engineering lead.", "Postmortem meeting minutes for production incident UI-22644. Date of issue: 7 January 2026. 3 pages, complete. Signed by the incident postmortem chair."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Output complete if every applicable line is met (extra documents do not matter). Output incomplete if at least one applicable line is not met. Output unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so base your judgement on the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-31", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 822}} {"id": "isc-te-00111-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Orrham & Co", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "12 June 2026"}, "checklist": ["Risk assessment for the task: issued within the last 3 months and signed.", "Job request form: signed.", "Access authorisation slip: signed.", "Planned completion date sheet: signed.", "Cost estimate: issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request HG-58912", "reference": "AR-31853"}, "documents received": ["Access authorisation slip HG-58912.pdf — Access authorisation slip for maintenance request HG-58912, dated 9 April 2026. Single page. Signed by the site access controller.", "Visitor pass 9 April 2026.pdf — Visitor pass from a previous visit connected to maintenance request HG-58912, dated 9 April 2026. Single page. Signed by the visitor who used it.", "Job request form HG-58912.pdf — Job request form for maintenance request HG-58912, dated 28 April 2026. Single page. Signed by the requesting manager.", "Cost estimate HG-58912.pdf — Cost estimate for maintenance request HG-58912, dated 2 April 2026. 2 pages, complete. Signed by the estimating supervisor.", "Risk assessment HG-58912.pdf — Risk assessment for the task under maintenance request HG-58912, dated 12 May 2026. 5 pages, complete. Signed by the health and safety officer.", "Planned completion date sheet HG-58912.pdf — Planned completion date sheet for maintenance request HG-58912, dated 9 April 2026. Single page. Signed by the facilities coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 807}} {"id": "isc-te-00044-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Abrmouth Partners", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "2 April 2026"}, "checklist": ["Utilities connection certificate on file.", "Warehouse insurance policy on file, valid (not expired) on the date of the review.", "Planning permission on file.", "Signed lease agreement on file, signed.", "Racking inspection report on file, issued within the last 12 months and signed.", "If the warehouse site is in a flood risk area, also: flood risk assessment, signed.", "Fire safety certificate on file, valid (not expired) on the date of the review."], "submission": {"case": {"name": "warehouse UE-7753", "reference": "YO-81533", "details": ["The warehouse site is not in a flood risk area."]}, "cover note": "I have put this pack together for review, but I am not sure everything needed is there.", "documents received": ["Racking inspection report for warehouse UE-7753. Date of issue: 12 July 2025. 2 pages, complete. Signed by the racking inspector.", "Fire safety certificate for warehouse UE-7753. Expiry date: 29 November 2026. 2 pages, complete.", "Signed lease agreement for warehouse UE-7753. Date of issue: 6 January 2026. 8 pages, complete. Signed by the landlord and the tenant.", "Utilities connection certificate for warehouse UE-7753. Date of issue: 8 December 2025. Single page.", "Planning permission for warehouse UE-7753. Date of issue: 24 February 2026. 2 pages, complete.", "Warehouse insurance policy for warehouse UE-7753. Expiry date: 14 April 2027. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "The decision required is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-67", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 802}} {"id": "isc-te-00349-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Fervvik Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "17 July 2026"}, "checklist": ["Nominated store preference form, signed", "Terms and conditions acceptance sheet, signed", "Initial points balance statement, issued within the last 3 months", "Identity verification document, valid (not expired) on the date of the review", "If the customer is transferring points from a rival scheme, also: points transfer evidence statement, issued within the last 3 months and signed", "Customer contact details sheet, signed"], "submission": {"case": {"name": "Giulia Natell", "reference": "BP-19825", "details": ["The customer is transferring points from a rival scheme."]}, "cover note": "Hi, please find the pack attached. A colleague has already checked this pack, so it should be ready for your review. Best wishes, Antoine", "documents received": ["customer_contact_details_sheet_Giulia_Natell.pdf. Customer contact details sheet for Giulia Natell, dated 20 March 2026. A single page, signed by Giulia Natell.", "nominated_store_preference_form_Giulia_Natell.pdf. Nominated store preference form for Giulia Natell, dated 28 June 2026. A single page, signed by Giulia Natell.", "terms_and_conditions_acceptance_sheet_Giulia_Natell.pdf. Terms and conditions acceptance sheet for Giulia Natell, dated 26 June 2026. A single page, signed by Giulia Natell.", "identity_verification_document_Giulia_Natell.pdf. Identity verification document for Giulia Natell, with an expiry date of 10 May 2027. A single page.", "points_transfer_request_Giulia_Natell.pdf. Points transfer request for Giulia Natell, dated 5 July 2026. A single page, signed by Giulia Natell.", "initial_points_balance_statement_Giulia_Natell.pdf. Initial points balance statement for Giulia Natell, dated 11 July 2026. A single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 840}} {"id": "isc-te-00331-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Prydcourt SAS", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "5 June 2026"}, "checklist": ["Flight itinerary quote, issued within the last 1 months.", "Travel request form, signed.", "If the traveller is not a passport holder of the destination country, also: work permit confirmation.", "Visa entry requirement printout, issued within the last 3 months.", "Line manager approval, signed.", "Trip cost estimate, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Passport copy for international travel, valid (not expired) on the date of the review."], "submission": {"case": {"name": "business trip XN-31948", "reference": "DF-94343", "details": ["The traveller is not a passport holder of the destination country.", "The trip involves no country requiring a visa."]}, "cover note": "Everything needed for this pack is attached and complete.", "documents received": ["Trip cost estimate for business trip XN-31948, dated 20 May 2026. 1 page. Signed by the travel coordinator.", "Hotel booking confirmation for business trip XN-31948, dated 6 March 2026. 2 pages, complete.", "Flight itinerary quote for business trip XN-31948, dated 30 May 2026. 2 pages, complete.", "Visa entry requirement printout for business trip XN-31948, dated 8 April 2026. 2 pages, complete.", "Passport copy for international travel for business trip XN-31948, showing expiry date 6 August 2027. 1 page.", "Travel request form for business trip DR-79085, dated 16 May 2026. 2 pages, complete. Signed by the traveller.", "Work permit confirmation for business trip XN-31948, dated 31 March 2026. 2 pages, complete.", "Travel policy acknowledgement for business trip XN-31948, dated 5 February 2026. 1 page. Signed by the traveller.", "Line manager approval for business trip XN-31948, dated 10 May 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 730}} {"id": "isc-te-00042-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Cindburg Group", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "16 March 2026"}, "checklist": ["Outbound loading record, issued within the last 1 months, signed", "Seal number log, issued within the last 1 months, signed", "Load consolidation sheet, issued within the last 3 months, signed", "Transfer manifest, signed", "Inbound unloading record, issued within the last 1 months, signed", "Damaged goods exception sheet, issued within the last 1 months, signed"], "submission": {"case": {"name": "cross-dock transfer BE-71642", "reference": "UP-20974"}, "documents received": ["Load consolidation sheet for cross-dock transfer BE-71642, dated 13 December 2025. 2 pages, complete. Signed by the load consolidation supervisor.", "Transfer manifest for cross-dock transfer BE-71642, dated 20 November 2025. 3 pages, complete. Signed by the transport planner.", "Cross-dock slot booking sheet for cross-dock transfer BE-71642, dated 5 March 2026. Single page. Signed by the dock scheduler.", "Seal number log for cross-dock transfer BE-71642, dated 8 March 2026. Single page. Signed by the outbound loading supervisor.", "Inbound unloading record for cross-dock transfer BE-71642, dated 5 March 2026. Single page. Signed by the inbound unloading supervisor.", "Outbound loading record for cross-dock transfer BE-71642, dated 27 February 2026. Single page. Signed by the outbound loading supervisor.", "Damaged goods exception sheet for cross-dock transfer BE-71642, dated 14 March 2026. Single page. Signed by the inbound unloading supervisor."]}}, "question": {"type": "choice", "instructions": "Does the pack fully satisfy the checklist? Check every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not trust cover notes and labels blindly, as they may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-73", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 824}} {"id": "isc-te-00125-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Fravberg LLP", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "6 April 2026"}, "checklist": ["Check for a signed stamp duty return.", "Check for a company search report issued within the last 1 months.", "If the lease term is longer than seven years, also check for a signed land registration application.", "Check for a signed guarantor consent letter.", "If the tenant is a newly formed company, also check for a signed parent company guarantee (signed).", "Check for a signed draft lease."], "submission": {"case": {"name": "premises AA-3696", "reference": "GR-61853", "details": ["The lease term is longer than seven years.", "The tenant is a newly formed company."]}, "cover note": "I have put this pack together for review, but I am not sure that everything needed is there. Please let me know if anything else is required.", "documents received": ["Stamp duty return - premises AA-3696.pdf — Stamp duty return for premises AA-3696, dated 8 January 2026. 2 pages, complete. Signed by the tenant.", "Guarantor consent letter - premises AA-3696.pdf — Guarantor consent letter for premises AA-3696, dated 2 March 2026. 1 page. Signed by the guarantor.", "Land registration application - premises AA-3696.pdf — Land registration application for premises AA-3696, dated 3 January 2026. 2 pages, complete. Signed by the landlord's solicitor.", "Company search report - premises AA-3696.pdf — Company search report for premises AA-3696, dated 26 March 2026. 2 pages, complete.", "Draft lease - premises AA-3696.pdf — Signed draft lease for premises AA-3696, dated 18 December 2025. 12 pages, complete. Signed by the landlord and the tenant.", "Parent company guarantee - premises AA-3696.pdf — Signed parent company guarantee for premises AA-3696, dated 1 January 2026. 3 pages, complete. Signed by a director of the parent company."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 885}} {"id": "isc-te-00129-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Austmere Partners", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "31 July 2026"}, "checklist": ["Check that the signed franchise agreement counterpart is signed.", "Check that the franchise application form is signed.", "Check that the operator licence is valid and has not expired on the date of the review.", "Check that the franchise disclosure document receipt was issued within the last 3 months and is signed.", "If the franchisee intends to operate through a company rather than as an individual, also check the shareholder agreement extract is signed.", "Check that the fit-out cost estimate was issued within the last 6 months and is signed."], "submission": {"case": {"name": "Norvberg Inc", "reference": "LJ-79438", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "documents received": ["Signed franchise agreement counterpart for Norvberg Inc, dated 2 May 2026. 12 pages, complete. Signed by an authorised signatory for the franchisor.", "Franchise disclosure document receipt for Norvberg Inc, dated 26 July 2026. 1 page. Signed by an authorised signatory for the franchisee.", "Operator licence for Norvberg Inc, expiry date 5 December 2027. 2 pages, complete.", "Franchise application form for Norvberg Inc, dated 6 May 2026. 3 pages, complete. Signed by an authorised signatory for the franchisee.", "Fit-out cost estimate for Norvberg Inc, dated 13 May 2026. 4 pages, complete. Signed by an authorised signatory for the franchisee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 761}} {"id": "isc-te-00100-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Elvwell Group", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "23 April 2026"}, "checklist": ["Bank statement (issued within the last 3 months)", "If the property is a new build, also: new build warranty certificate", "Sale and purchase agreement (signed)", "Property valuation report (issued within the last 6 months, signed)", "Proof of deposit (issued within the last 3 months)", "Mortgage application form (signed)"], "submission": {"case": {"name": "property NL-32293", "reference": "OP-43626", "details": ["The property is a new build."]}, "documents received": ["Proof_of_deposit_NL-32293.pdf - Proof of deposit for property NL-32293. Date of issue: 23 February 2026. 1 page.", "Sale_and_purchase_agreement_NL-32293.pdf - Sale and purchase agreement for property NL-32293. Date of issue: 9 January 2026. 9 pages, complete. Signed by the buyer and the seller.", "Bank_statement_NL-32293.pdf - Bank statement for property NL-32293. Date of issue: 3 April 2026. 3 pages, complete.", "Mortgage_application_form_NL-32293.pdf - Mortgage application form for property NL-32293. Date of issue: 10 March 2026. 6 pages, complete. Signed by the applicant.", "New_build_warranty_certificate_NL-32293.pdf - New build warranty certificate for property NL-32293. Date of issue: 1 February 2026. 3 pages, complete.", "Property_valuation_report_NL-32293.pdf - Property valuation report for property NL-32293. Date of issue: 8 December 2025. 10 pages, complete. Signed by the valuer."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00409-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Jundwald Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "28 August 2026"}, "checklist": ["Audit finding sheets, signed", "Audit attendance sheet, signed", "Previous audit follow-up record, issued within the last 24 months, signed", "Audit interview notes, signed", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list, signed"], "submission": {"case": {"name": "internal audit AM-70822", "reference": "KP-15972", "details": ["The audit did not cover the calibration laboratory."]}, "documents received": ["Audit finding sheets AM-70822.pdf. Dated 5 July 2026, the sheets record the findings of internal audit AM-70822. 2 pages, complete. Each sheet is signed by the lead auditor.", "Previous audit follow-up record AM-70822.pdf. Dated 16 October 2025, this record covers the follow-up actions from internal audit AM-70822. 2 pages, complete. It is signed by the quality manager.", "Audit attendance sheet AM-70822.pdf. This single page, dated 16 August 2026, lists those present at internal audit AM-70822. It is signed by the lead auditor.", "Audit interview notes AM-70822.pdf. These notes, dated 26 June 2026, cover the interviews held during internal audit AM-70822. 3 pages, complete. They are signed by the auditor who conducted the interviews."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 752}} {"id": "isc-te-00182-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Faldfell Ltd", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "11 March 2026"}, "checklist": ["Licence reassignment note issued within the last 3 months, signed.", "Asset register update issued within the last 1 months.", "Data wipe certificate issued within the last 3 months, signed.", "Final backup confirmation issued within the last 3 months, signed.", "Decommission request form, signed."], "submission": {"case": {"name": "retired server ZL-17533", "reference": "WS-76990"}, "documents received": ["Single-page final backup confirmation for retired server ZL-17533, dated 18 February 2026, signed by the backup operator.", "Dependent systems check report for retired server ZL-17533, dated 5 January 2026, 3 pages, complete.", "Single-page licence reassignment note for retired server ZL-17533; the issue date is smudged and cannot be read. The note is signed by the licence administrator.", "Decommission request form for retired server ZL-17533, dated 19 December 2025, 2 pages, complete, signed by the requesting system owner.", "Single-page data wipe certificate for retired server ZL-17533, dated 22 February 2026, signed by the data sanitisation technician.", "Single-page asset register update for retired server ZL-17533, dated 8 March 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 739}} {"id": "isc-te-00118-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Wynshaw Ltd", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "4 August 2026"}, "checklist": ["Witness list, signed.", "Investigator appointment letter, issued within the last 3 months.", "Evidence bundle index, signed.", "Adjustment request record, issued within the last 3 months, signed.", "Previous grievance outcome letter, issued within the last 24 months.", "Meeting invitation with rights explained, issued within the last 1 months."], "submission": {"case": {"name": "Sanne Ingson", "reference": "PI-43445"}, "documents received": ["Investigator appointment letter dated 28 May 2026 concerning Sanne Ingson. It is 1 page.", "Adjustment request record dated 16 July 2026 concerning Sanne Ingson. It is 1 page and is signed by the HR adviser.", "Witness list dated 25 April 2026 concerning Sanne Ingson. It is 1 page and is signed by the investigating officer.", "Grievance procedure acknowledgement dated 5 July 2026 concerning Sanne Ingson. It is 1 page and is signed by Sanne Ingson.", "Evidence bundle index dated 11 June 2026 concerning Sanne Ingson. It is 2 pages, complete, and is signed by the case administrator.", "Meeting invitation with rights explained dated 24 July 2026 concerning Sanne Ingson. It is 1 page.", "Previous grievance outcome letter dated 3 October 2024 concerning Sanne Ingson. Pages 1 to 1 are included and the total number of pages is not shown anywhere on the document."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 759}} {"id": "isc-te-00493-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Delvlund GmbH", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "6 August 2026"}, "checklist": ["Check that the signed credit terms agreement is included and signed.", "Check that the personal guarantee is included and signed.", "Check that the company registration certificate is included.", "Check that the bank reference letter is included, was issued within the last 6 months, and is signed.", "Check that the trade references letter is included, was issued within the last 3 months, and is signed.", "Check that the credit reference agency report is included and was issued within the last 3 months."], "submission": {"case": {"name": "Haskhurst Limited", "reference": "ZB-88049"}, "documents received": ["Credit limit approval memo - Haskhurst Limited.pdf. Dated 18 July 2026, this credit limit approval memo concerns Haskhurst Limited and is signed by the credit control manager. 1 page.", "Signed credit terms agreement - Haskhurst Limited.pdf. Dated 7 June 2026, this signed credit terms agreement concerns Haskhurst Limited and is signed by the company's managing director. 4 pages, complete.", "Bank reference letter - Haskhurst Limited.pdf. Dated 3 August 2026, this bank reference letter concerns Haskhurst Limited and is a single page. The signature line is empty, so it is not signed.", "Company registration certificate - Haskhurst Limited.pdf. Dated 20 April 2026, this company registration certificate concerns Haskhurst Limited. 2 pages, complete.", "Trade references letter - Haskhurst Limited.pdf. Dated 22 July 2026, this trade references letter concerns Haskhurst Limited and is signed by the trade referee. 1 page.", "Credit reference agency report - Haskhurst Limited.pdf. Dated 18 July 2026, this credit reference agency report concerns Haskhurst Limited. 6 pages, complete.", "Personal guarantee - Haskhurst Limited.pdf. Dated 27 May 2026, this personal guarantee concerns Haskhurst Limited and is signed by the guarantor. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 867}} {"id": "isc-te-00474-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Belmdale Partners", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "4 May 2026"}, "checklist": ["New floor snagging list, issued within the last 1 months and signed", "Movers insurance certificate, valid (not expired) on the date of the review", "Crate hire agreement, signed", "IT decommissioning certificate, issued within the last 1 months and signed", "If the move includes taking furniture to a storage unit, also: storage unit access authorisation, signed", "Signed move plan", "Furniture inventory list, issued within the last 1 months and signed"], "submission": {"case": {"name": "office move project ID-94583", "reference": "DM-22219", "details": ["The move includes taking furniture to a storage unit."]}, "documents received": ["Furniture inventory list ID-94583.pdf — Furniture inventory list for office move project ID-94583, dated 29 April 2026. 4 pages, complete. Signed by the facilities manager.", "Crate hire agreement ID-94583.pdf — Crate hire agreement for office move project ID-94583, dated 7 February 2026. 2 pages, complete. Signed by the crate hire supplier.", "Movers insurance certificate ID-94583.pdf — Movers insurance certificate for office move project ID-94583. Shows an expiry date of 8 April 2027. Single page.", "Move plan ID-94583.pdf — Signed move plan for office move project ID-94583, dated 17 February 2026. 6 pages, complete. Signed by the move project manager.", "IT decommissioning certificate ID-94583.pdf — IT decommissioning certificate for office move project ID-94583, dated 29 April 2026. Single page. Signed by the IT manager.", "New floor snagging list ID-94583.pdf — New floor snagging list for office move project ID-94583, dated 17 April 2026. 3 pages, complete. Signed by the site manager.", "Lifting equipment inspection report ID-94583.pdf — Lifting equipment inspection report for office move project ID-94583, dated 25 April 2026. 2 pages, complete. Signed by the lifting equipment inspector."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 938}} {"id": "isc-te-00094-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Yarvmoor Ltd", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "3 March 2026"}, "checklist": ["Peer review checklist, issued within the last 1 months, signed", "Business justification memo, issued within the last 3 months, signed", "Firewall change request form, signed", "Risk assessment, issued within the last 3 months, signed", "Post-change test plan, signed", "If the change is planned during the year-end close period, also: freeze period exception approval, signed"], "submission": {"case": {"name": "firewall change LC-56285", "reference": "RF-86349", "details": ["The change is planned during the year-end close period."]}, "documents received": ["Risk_assessment_LC-56285.pdf — Risk assessment for firewall change LC-56285, dated 6 February 2026. It has 2 pages, complete, and is signed by the risk assessor.", "Peer_review_checklist_LC-56285.pdf — Peer review checklist for firewall change LC-56285, dated 16 February 2026. It is a single page, signed by the peer reviewer.", "Business_justification_memo_LC-56285.pdf — Business justification memo for firewall change LC-56285, dated 16 January 2026. It is a single page, signed by the requesting business owner.", "Proposed_rule_change_specification_LC-56285.pdf — Proposed rule change specification for firewall change LC-56285, dated 13 November 2025. It has 2 issued within the last 3 months, complete, and is signed by the rule change author.", "Post-change_test_plan_LC-56285.pdf — Post-change test plan for firewall change LC-56285, dated 20 February 2026. It has 2 pages, complete, and is signed by the test plan author.", "Firewall_change_request_form_LC-56285.pdf — Firewall change request form for firewall change LC-56285, dated 24 November 2025. It has 3 pages, complete, and is signed by the requesting firewall engineer."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 912}} {"id": "isc-te-00357-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zaldlock LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "10 August 2026"}, "checklist": ["Confirm the fuel policy sheet is present and signed.", "If the booking includes crossing a land border, also confirm the cross-border travel permission is present and signed.", "Confirm the passport is present, signed, and valid (not expired) on the date of the review.", "Confirm the insurance excess waiver certificate is present and valid (not expired) on the date of the review.", "Confirm the booking voucher is present and was issued within the last 6 months.", "Confirm the vehicle condition report is present and signed.", "Confirm the additional driver authorisation form is present and signed."], "submission": {"case": {"name": "Beatriz Plumworth", "reference": "WE-85422", "details": ["The booking stays within one country."]}, "documents received": ["Fuel policy sheet. A single-page fuel policy sheet in the name of Beatriz Plumworth, dated 18 April 2026, signed by the named driver.", "Vehicle condition report. A report in the name of Beatriz Plumworth dated 30 July 2026, signed by the counter staff member who carried out the vehicle check. 2 pages, complete.", "Passport. A single-page passport in the name of Beatriz Plumworth showing an expiry date of 29 October 2028, signed by the passport holder.", "Driving licence. A licence in the name of Beatriz Plumworth showing an expiry date of 19 August 2028, signed by the licence holder. 2 pages, complete.", "Insurance excess waiver certificate. A certificate in the name of Beatriz Plumworth showing an expiry date of 4 January 2025. 2 pages, complete.", "Additional driver authorisation form. A single-page authorisation form in the name of Beatriz Plumworth dated 24 July 2026, signed by the named driver.", "Booking voucher. A single-page booking voucher in the name of Beatriz Plumworth showing a date of issue of 7 June 2026.", "Insurance excess waiver certificate. A certificate in the name of Beatriz Plumworth showing an expiry date of 18 August 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 884}} {"id": "isc-te-00341-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Dundcombe Group", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "7 May 2026"}, "checklist": ["Cost-benefit justification is attached", "Equipment purchase request form is attached, signed", "Vendor quotation is attached, issued within the last 3 months", "Training needs assessment is attached, signed", "Maintenance plan is attached"], "submission": {"case": {"name": "equipment BU-49803", "reference": "HE-68114"}, "documents received": ["Vendor quotation for equipment BU-49803, dated 21 April 2026. 2 pages, complete.", "Training needs assessment for equipment BU-49803, dated 5 April 2026. A single page. Signed by the training coordinator.", "File scan_00104.pdf. The file will not open, so its contents cannot be seen.", "Equipment purchase request form for equipment BU-49803, dated 11 February 2026. 2 pages, complete. Signed by the requesting department head.", "Maintenance plan for equipment BU-49803, dated 19 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case, one by one. A required document counts only if: it is the kind of document listed (not a similar one); it is about the subject of the case; it has all its pages; it is signed where the checklist asks for a signature; it has not expired on the date of the review; and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-2", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 663}} {"id": "isc-te-00199-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silridge Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "18 March 2026"}, "checklist": ["Delegate photo identification that is valid, meaning not expired, on the date of the review.", "Cancellation policy acceptance, signed.", "Special requirements note.", "Employer sponsorship letter issued within the last 3 months, signed.", "Venue access instructions issued within the last 3 months.", "If the course leads to a licensed qualification, also: licence eligibility declaration, signed.", "Prerequisite certificate."], "submission": {"case": {"name": "course booking PG-59381", "reference": "XR-38194"}, "documents received": ["Employer sponsorship letter, course booking PG-59381. Issued 7 March 2026. Signed by the employer's authorised signatory. 1 page.", "Venue access instructions, course booking PG-59381. Issued 13 February 2026. 1 page.", "Prerequisite certificate, course booking PG-59381. Issued 16 December 2025. 1 page.", "Cancellation policy acceptance, course booking PG-59381. Issued 7 February 2026. Signed by the delegate. 1 page.", "Delegate photo identification, course booking PG-59381. The identification expires on 28 November 2026. 1 page.", "Special requirements note, course booking PG-59381. Issued 26 January 2026. 1 page.", "Licence eligibility declaration, course booking PG-59381. Issued 26 December 2025. Signed by the delegate. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 772}} {"id": "isc-te-00064-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Rondgard Ltd", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "8 June 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Visa entry requirement printout (issued within the last 3 months)", "Travel request form (signed)", "Flight itinerary quote (issued within the last 1 months)", "Hotel booking confirmation"], "submission": {"case": {"name": "business trip WO-61646", "reference": "UY-28386"}, "documents received": ["Travel request form for business trip WO-61646. It shows a date of issue of 17 February 2026. 2 pages, complete. It is signed by the line manager.", "Hotel booking confirmation for business trip WO-61646. It shows a date of issue of 25 May 2026. 2 pages, complete.", "Visa entry requirement printout for business trip WO-61646. It shows a date of issue of 14 May 2026. 2 pages, complete.", "Flight itinerary quote for business trip WO-61646. It shows a date of issue of 28 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine whether the checklist is fully satisfied by the pack. Go over every checklist line that applies to this case. A required document counts only when it is the kind of document the checklist lists (not merely a similar one), when it is about the case's subject, when it has all its pages, when it is signed wherever the checklist asks for a signature, when it has not expired as of the review date, and when it was issued within the period the checklist allows. Only if its circumstance holds for the case does a conditional line apply. complete: each applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example because a needed date, signature or page count is not visible, because a document's kind cannot be told, or because the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves are what you must judge.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "variant-53", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 703}} {"id": "isc-te-00280-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Yarvham Limited", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "4 May 2026"}, "checklist": ["Board resolution to open the account, signed", "Company tax registration certificate", "Proof of registered office address, issued within the last 3 months", "If the company operates in a cash-intensive trade, also: cash handling policy, signed", "Authorised signer identity document, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Lombham Partners", "reference": "JE-39716", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["A scanned company statutes document for Lombham Partners, issued on 9 January 2026. It is 12 pages, complete, and signed by the company secretary.", "A scanned authorised signer identity document for Lombham Partners, with an expiry date of 15 August 2028. It is 1 page.", "A scanned proof of registered office address for Lombham Partners, issued on 15 April 2026. It is 1 page.", "A scanned cash handling policy for Lombham Partners, dated 31 March 2026. It is 2 pages, complete, and signed by the managing director.", "A scanned company tax registration certificate for Lombham Partners, issued on 6 January 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 699}} {"id": "isc-te-00392-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Ambstead SAS", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "10 September 2026"}, "checklist": ["Production downtime log, issued within the last 3 months and signed.", "Photographs of the failed component.", "Policy machinery schedule.", "If a temporary machine was hired to keep production going, also: temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Equipment breakdown claim form, signed."], "submission": {"case": {"name": "failed machine VR-6417", "reference": "NN-62631", "details": ["No temporary machine was hired to keep production going."]}, "documents received": ["Equipment_breakdown_claim_form_VR-6417.pdf. This equipment breakdown claim form for failed machine VR-6417 is dated 25 May 2026 and is 3 pages, complete. The form is signed by the policyholder.", "Production_downtime_log_VR-6417_21_June_2026.pdf. This production downtime log for failed machine VR-6417 is dated 21 June 2026 and is 2 pages, complete. The log is signed by the production supervisor.", "Photographs_of_failed_component_VR-6417.pdf. These photographs of the failed component of machine VR-6417 are dated 12 July 2026 and come as 2 pages, complete.", "Policy_machinery_schedule_VR-6417.pdf. This policy machinery schedule for failed machine VR-6417 is dated 3 July 2026 and runs to 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 752}} {"id": "isc-te-00060-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Glengard Group", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "3 April 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed", "Certificate of insurance, valid (not expired) on the date of the review", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid (not expired) on the date of the review", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed", "Supplier registration form, signed", "Anti-bribery policy statement, signed", "Certificate of incorporation", "Supplier declaration of no conflicts of interest, signed"], "submission": {"case": {"name": "Austwyn Limited", "reference": "LU-89623", "details": ["The supplier is a small business with a single owner.", "The supplier is a domestic company."]}, "cover note": "I'm sorry the pack was put together in a rush, please tell me if anything needs resending.", "documents received": ["Anti-bribery policy statement for Austwyn Limited. Dated 11 January 2026, 2 pages, complete, signed by the supplier's managing director.", "Certificate of insurance for Austwyn Limited. Shows an expiry date of 5 July 2028, 2 pages, complete.", "Copy of the owner's photo identification for Austwyn Limited. Shows an expiry date of 28 May 2027, 1 page.", "Certificate of incorporation for Austwyn keep name consistent: Austwyn Limited. Dated 7 January 2026, 2 pages, complete.", "Bank details confirmation letter for Austwyn Limited. Dated 21 March 2026, 1 page, signed by the supplier's finance manager.", "Supplier declaration of no conflicts of interest for Austwyn Limited. Dated 27 March 2026, 1 page, signed by the supplier's managing director.", "Supplier registration form for Austwyn Limited. Dated 8 January 2026, 3 pages, complete, signed by the supplier's managing director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 858}} {"id": "isc-te-00129-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Austmere Partners", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "31 July 2026"}, "checklist": ["Check that the signed franchise agreement counterpart is signed.", "Check that the franchise application form is signed.", "Check that the operator licence is valid and has not expired on the date of the review.", "Check that the franchise disclosure document receipt was issued within the last 3 months and is signed.", "If the franchisee intends to operate through a company rather than as an individual, also check the shareholder agreement extract is signed.", "Check that the fit-out cost estimate was issued within the last 6 months and is signed."], "submission": {"case": {"name": "Norvberg Inc", "reference": "LJ-79438", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "cover note": "Please find attached the full pack for reference LJ-79438, which is now complete with everything needed. I have checked it through and nothing further is required.", "documents received": ["Signed franchise agreement counterpart for Norvberg Inc, dated 2 May 2026. 12 pages, complete. Signed by an authorised signatory for the franchisor.", "Franchise disclosure document receipt for Norvberg Inc, dated 26 July 2026. 1 page. Signed by an authorised signatory for the franchisee.", "Fit-out cost estimate for Norvberg Inc, dated 13 May 2026. 4 pages, complete. Signed by an authorised signatory for the franchisee.", "Operator licence for Norvberg Inc, expiry date 5 December 2027. 2 pages, complete.", "Training course completion certificate for Norvberg Inc, dated 12 April 2026. 1 page.", "Franchise application form for Norvberg Inc, dated 6 May 2026. 3 pages, complete. Signed by an authorised signatory for the franchisee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 827}} {"id": "isc-te-00220-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Vaskheim plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "29 June 2026"}, "checklist": ["Company registration certificate on file.", "Bank reference letter on file, issued within the last 6 months and signed.", "Credit limit approval memo on file, issued within the last 1 months and signed.", "Credit reference agency report on file, issued within the last 3 months.", "Signed credit terms agreement on file, signed."], "submission": {"case": {"name": "Tondston Group", "reference": "EP-62790"}, "documents received": ["bank-reference-letter.pdf - Bank reference letter for Tondston Group. Date of issue: 10 January 2026. Single page, signed by the bank manager.", "company-registration-certificate.pdf - Company registration certificate for Tondston Group. Date of issue: 27 March 2026. 2 pages, complete.", "trade-account-application-form.pdf - Trade account application form for Tondston Group. Date of issue: 9 June 2026. 3 pages, complete, signed by the company secretary.", "signed-credit-terms-agreement.pdf - Signed credit terms agreement for Tondston Group. Date of issue: 5 June 2026. 4 pages, complete, signed by the finance director.", "credit-limit-approval-memo.pdf - Credit limit approval memo for Tondston Group. Date of issue: 13 June 2026. Single page, signed by the finance director.", "credit-reference-agency-report.pdf - Credit reference agency report for Tondston Tondston Group. Date of issue: 31 May 2026. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 770}} {"id": "isc-te-00102-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Elvcrest Ltd", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "7 May 2026"}, "checklist": ["Proof of registered office address, issued within the last 3 months", "Authorised signer identity document, valid (not expired) on the date of the review", "Board resolution to open the account, signed", "Beneficial owner identification form, signed", "Company tax registration certificate", "Certificate of incorporation"], "submission": {"case": {"name": "Pentlund GmbH", "reference": "WW-71385"}, "documents received": ["Company tax registration certificate for Pentlund GmbH. Date of issue: 29 April 2026. Single page.", "Board resolution to open the account for Pentlund GmbH. Date of issue: 6 February 2026. Signed by the chair of the board. Single page.", "Proof of registered office address for Pentlund GmbH. Date of issue: 25 March 2026. Single page.", "Beneficial owner identification form for Pentlund GmbH. Date of issue: 17 January 2026. 3 pages, complete. Signed by the authorised signer.", "Certificate of incorporation for Pentlund GmbH. Date of issue: 2 March 2026. Single page.", "Authorised signer identity document for Pentlund GmbH. Expiry date: 5 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "expired before the review", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 691}} {"id": "isc-te-00344-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Xanmore GmbH", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 March 2026"}, "checklist": ["Confirm the intellectual property register extract is included, issued within the last 6 months and signed.", "Confirm the external advisory board minutes are included, issued within the last 12 months and signed.", "Confirm the annual activity report is included, issued within the last 6 months and signed.", "Confirm the staffing plan is included, issued within the last 6 months and signed.", "If the institute received industry funding above the university's disclosure threshold, also confirm the industry funding disclosure statement is included, issued within the last 12 months and signed."], "submission": {"case": {"name": "Veyhurst Ltd", "reference": "UY-40041", "details": ["The institute received no industry funding above the university's disclosure threshold."]}, "documents received": ["External advisory board minutes for Veyhurst Ltd. Date of issue: 15 February 2026. 4 pages, complete. Signed by the chair of the external advisory board.", "Annual activity report for Veyhurst Ltd. Date of issue: 19 January 2026. 12 pages, complete. Signed by the institute director.", "Intellectual property register extract for Veyhurst Ltd. Date of issue: 18 December 2025. 1 page. Signed by the institute's technology transfer officer.", "Staffing plan for Veyhurst Ltd. Date of issue: 12 September 2025. 2 pages, complete. Signed by the institute director.", "Publications list for Veyhurst Ltd. Date of issue: 8 February 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 767}} {"id": "isc-te-00260-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Baxcrest SAS", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "1 May 2026"}, "checklist": ["Alternatives considered table", "Cost estimate sheet, issued within the last 6 months", "Capacity and load estimate, issued within the last 6 months", "Migration and rollout plan", "Proposed architecture diagram"], "submission": {"case": {"name": "design document UZ-54491", "reference": "GO-74704"}, "documents received": ["uz54491_migration_and_rollout_plan.pdf - Migration and rollout plan for design document UZ-54491. Date of issue: 12 March 2026. 3 pages, complete.", "uz54491_proposed_architecture_diagram.pdf - Proposed architecture diagram for design document UZ-54491. Date of issue: 2 February 2026. Single page.", "uz54491_cost_estimate_sheet.pdf - Cost estimate sheet for design document UZ-54491. Date of issue: 13 February 2026. 2 pages, complete.", "uz54491_problem_statement_page.pdf - Problem statement page for design document UZ-54491. Date of issue: 8 April 2026. 2 pages, complete.", "uz54491_capacity_and_load_estimate.pdf - Capacity and load estimate for design document UZ-54491. Date of issue: 20 December 2025. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 735}} {"id": "isc-te-00315-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Haskwell Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "7 September 2026"}, "checklist": ["Obtain a financial stability statement issued within the last 12 months and signed.", "Obtain a supplier capacity declaration issued within the last 12 months and signed.", "Obtain a supplier corrective action plan issued within the last 6 months and signed.", "Obtain a supplier quality questionnaire issued within the last 12 months and signed."], "submission": {"case": {"name": "Nordlock GmbH", "reference": "XW-60086"}, "documents received": ["Scanned supplier capacity declaration concerning Nordlock GmbH, dated 9 August 2026. 2 pages, complete. Signed by the supplier's operations manager.", "Scanned supplier quality questionnaire concerning Nordlock GmbH, dated 22 May 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Scanned financial stability statement concerning Nordlock GmbH, dated 12 April 2026. 2 pages, complete. Signed by the supplier's finance director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 628}} {"id": "isc-te-00373-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Selvmont & Co", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "24 April 2026"}, "checklist": ["Signature verification record, signed", "Card replacement request form, signed", "Photo identification, valid (not expired) on the date of the review", "Confirmation of contact details, issued within the last 3 months", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "If the card was stolen rather than lost, also: police report reference document, issued within the last 1 months, signed"], "submission": {"case": {"name": "Matthias Sabopoulos", "reference": "SX-64326", "details": ["The cardholder is at their home address.", "The card was stolen rather than lost."]}, "documents received": ["Card replacement request form for Matthias Sabopoulos, dated 4 February 2026. 2 pages, complete. It is signed by the cardholder.", "Signature verification record for Matthias Sabopoulos, dated 1 February 2026. Single page. It is signed by the branch officer who verified the signature.", "Confirmation of contact details for Matthias Sabopoulos, dated 7 April 2026. Single page.", "Fraud questionnaire for Matthias Sabopoulos, dated 2 April 2026. 2 pages, complete. It is signed by the cardholder.", "Photo identification for Matthias Sabopoulos, showing an expiry date of 9 October 2028. Single page.", "Police report reference document for Matthias Sabopoulos, dated 14 April 2026. Single page. It is signed by the reporting officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00360-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Aldmoor & Co", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "29 May 2026"}, "checklist": ["If the server will be sold or donated rather than destroyed, also: disposal vendor certificate of destruction (issued within the last 3 months, signed)", "network disconnection confirmation (issued within the last 1 months, signed)", "data migration confirmation (issued within the last 3 months, signed)", "final backup confirmation (issued within the last 3 months, signed)", "licence reassignment note (issued within the last 3 months, signed)", "If the server holds archived records that must be kept, also: archive retention confirmation (issued within the last 3 months, signed)", "decommission request form (signed)", "dependent systems check report (issued within the last 3 months)"], "submission": {"case": {"name": "retired server LZ-34741", "reference": "SX-62950", "details": ["The server will be sold or donated rather than destroyed.", "The server holds no records with retention requirements."]}, "documents received": ["Final-backup-confirmation_LZ-34741.pdf. Final backup confirmation for retired server LZ-34741, issued 15 March 2026. A single page, signed by the backup administrator.", "Data-migration-confirmation_LZ-34741.pdf. Data migration confirmation for retired server LZ-34741, issued 17 April 2026. 2 pages, complete, signed by the data migration lead.", "Disposal-vendor-certificate-of-destruction_LZ-34741.pdf. Certificate of destruction for retired server LZ-34741, issued 17 April 2026. A single page, signed by the disposal vendor's operations manager.", "Asset-register-update_LZ-34741.pdf. Asset register update for retired server LZ-34741, issued 20 May 2026. A single page.", "Decommission-request-form_LZ-34741.pdf. Decommission request form for retired server LZ-34741, issued 21 March 2026. 2 pages, complete, signed by the requesting team's system owner.", "Network-disconnection-confirmation_LZ-34741.pdf. Network disconnection confirmation for retired server LZ-34741, issued 19 May 2026. A single page, signed by the network operations engineer.", "Dependent-systems-check-report_LZ-34741.pdf. Dependent systems check report for retired server LZ-34741, issued 15 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 994}} {"id": "isc-te-00256-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Mersfell BV", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "29 May 2026"}, "checklist": ["Include the original complaint record, issued within the last 6 months.", "Include the goodwill gesture approval note, issued within the last 1 months and signed.", "Include the proposed resolution letter draft, signed.", "Include the customer contact log, issued within the last 3 months.", "Include the policy breach summary, issued within the last 3 months and signed.", "Include the complaint escalation form, issued within the last 1 months and signed."], "submission": {"case": {"name": "escalated complaint SD-98346", "reference": "GZ-99079"}, "cover note": "Please accept my apologies for the pack being put together in a rush.", "documents received": ["SD-98346_original_complaint_record.pdf - Original complaint record for escalated complaint SD-98346. Date of issue: 24 April 2026. 2 pages, complete.", "SD-98346_policy_breach_summary.pdf - Policy breach summary for escalated complaint SD-98346. Date of issue: 1 May 2026. 2 pages, complete, signed by the Compliance Officer.", "SD-98346_complaint_escalation_form.pdf - Complaint escalation form for escalated complaint SD-98346. Date of issue: 26 May 2026. 2 pages, complete, signed by the Customer Relations Manager.", "SD-98346_proposed_resolution_letter_draft.pdf - Proposed resolution letter draft for escalated complaint SD-98346. Date of issue: 22 May 2026. 2 pages, complete, signed by the Customer Relations Manager.", "SD-98346_staff_shift_rota_service_desk.pdf - Staff shift rota for the service desk, linked to escalated complaint SD-98346. Date of issue: 11 May 2026. 3 pages, complete.", "SD-98346_customer_contact_log.pdf - Customer contact log for escalated complaint SD-98346. Date of issue: 11 May 2026. 3 pages, complete.", "File_ref_08.pdf - The file will not open, so its contents cannot be seen.", "SD-98346_goodwill_gesture_approval_note.pdf - Goodwill gesture approval note for escalated complaint SD-98346. Date of issue: 14 May 2026. Single page, signed by the Customer Relations Manager."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; base your judgement on the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-42", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 973}} {"id": "isc-te-00348-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Ilvmark Group", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "10 March 2026"}, "checklist": ["Check the pack contains a goodwill gesture approval note issued within the last 1 months and signed.", "If the complaint alleges a member of staff behaved rudely, also check the pack contains a staff member written response, signed.", "Check the pack contains a customer contact log issued within the last 3 months.", "If the complaint involves a data protection concern, also check the pack contains a data protection impact note issued within the last 1 months and signed.", "Check the pack contains a store incident report issued within the last 3 months and signed.", "Check the pack contains a complaint escalation form issued within the last 1 months and signed."], "submission": {"case": {"name": "escalated complaint HX-18721", "reference": "QF-35170", "details": ["The complaint alleges a member of staff behaved rudely.", "The complaint involves a data protection concern."]}, "documents received": ["Store incident report HX-18721.pdf. This store incident report about escalated complaint HX-18721 is dated 3 February 2026. It has 2 pages, complete, and is signed by the store manager.", "Staff member written response HX-18721.pdf. This staff member written response about escalated complaint HX-18721 is dated 6 February 2026. It is a single page and is signed by the staff member who wrote it.", "Goodwill gesture approval note HX-18721.pdf. This goodwill gesture approval note about escalated complaint HX-18721 is dated 8 March 2026. It is a single page and carries the signature of the customer relations manager.", "Complaint escalation form HX-18721.pdf. This complaint escalation form about escalated complaint HX-18721 is dated 7 March 2026. It has 2 pages, complete, and is signed by the case handler.", "Data protection impact note HX-18721.pdf. This data protection impact note about escalated complaint HX-18721 is dated 28 February 2026. It has 2 pages, complete, and is signed by the data protection officer.", "Customer contact log HX-18721.pdf. This customer contact log about escalated complaint HX-18721 is dated 27 January 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and say whether it is complete. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-47", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 963}} {"id": "isc-te-00402-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Wilmdale Limited", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "14 July 2026"}, "checklist": ["Trade account application form, signed.", "Bank reference letter, issued within the last 6 months, signed.", "Company registration certificate.", "If the customer is a newly incorporated company, also: director identification record, signed.", "Credit reference agency report, issued within the last 3 months.", "Credit limit approval memo, issued within the last 1 months, signed."], "submission": {"case": {"name": "Larvridge Partners", "reference": "JU-12708", "details": ["The customer is not a newly incorporated company."]}, "documents received": ["Credit reference agency report for Larvridge Partners, dated 4 May 2026. 6 pages, complete.", "Bank reference letter for Larvridge Partners, dated 9 May 2026. Single page. Signed by a bank officer.", "Trade account application form for Larvridge Partners, dated 5 April 2026. 3 pages, complete. Signed by the customer's authorised signatory.", "Credit limit approval memo for Larvridge Partners, dated 26 June 2026. Single page. Signed by the credit control manager.", "Company registration certificate for Larvridge Partners, dated 27 June 2026. 2 pages, complete.", "Trade references letter for Larvridge Partners, dated 6 May 2026. Single page. Signed by the referee company's authorised signatory.", "Signed credit terms agreement for Larvridge Partners, dated 23 April 2026. 4 pages, complete. Signed by the customer's authorised signatory."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 761}} {"id": "isc-te-00148-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Lombheim Ltd", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "1 June 2026"}, "checklist": ["Capital gains asset record", "Gift aid donation summary", "Rental income record", "Childcare payment receipt issued within the last 13 months", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Tax return draft printout, signed"], "submission": {"case": {"name": "household tax affairs ND-78453", "reference": "UP-21658", "details": ["The household sold a property other than its main home during the tax year."]}, "documents received": ["Bank interest statement for household tax affairs ND-78453, dated 13 July 2025. 3 pages, complete.", "Pension contribution certificate for household tax affairs ND-78453, dated 26 May 2025. 2 pages, complete.", "Rental income record for household tax affairs ND-78453, dated 5 May 2026. 4 pages, complete.", "Gift aid donation summary for household tax affairs ND-78453, dated 20 May 2026. Single page.", "Property disposal calculation sheet for household tax affairs ND-78453, dated 7 February 2026. 2 pages, complete. Signed by the household's tax filer.", "Tax return draft printout for household tax affairs ND-78453, dated 2 February 2026. 6 pages, complete. Signed by the household's tax filer.", "Childcare payment receipt for household tax affairs ND-78453, dated 14 May 2026. Single page.", "Capital gains asset record for household tax affairs ND-78453, dated 9 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 825}} {"id": "isc-te-00088-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Aldmouth Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "23 April 2026"}, "checklist": ["Customer deposit receipt, issued within the last 3 months.", "Package holiday brochure page.", "Booking request form, signed.", "Travel insurance quote, issued within the last 1 months.", "Passport details form, signed.", "If the booking includes a car hire, also: car hire quotation, issued within the last 1 months.", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review."], "submission": {"case": {"name": "holiday booking HK-33923", "reference": "LS-73051", "details": ["The booking includes a car hire.", "The booking includes a child traveller."]}, "documents received": ["Passport details form for holiday booking HK-33923. Date of issue: 10 April 2026. 1 page. Signed by the customer.", "Car hire quotation for holiday booking HK-33923. Date of issue: 11 April 2026. 2 pages, complete.", "Travel insurance quote for holiday booking HK-33923. Date of issue: 10 April 2026. 2 pages, complete.", "Booking request form for holiday booking HK-33923. Date of issue: 6 January 2026. 2 pages, complete. Signed by the customer.", "Flight availability printout for holiday booking HK-33923. Date of issue: 12 April 2026. 2 pages, complete.", "Child passport copy for holiday booking HK-33923. Expiry date: 20 February 2028. 1 page.", "Package holiday brochure page for holiday booking HK-33923. Date of issue: 17 January 2026. 1 page.", "Customer deposit receipt for holiday booking HK-33923. Date of issue: 10 April 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 857}} {"id": "isc-te-00045-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Teskmouth BV", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "24 June 2026"}, "checklist": ["If the supplier subcontracts part of the production, also: subcontractor approval record (issued within the last 12 months, signed)", "Raw material certificate of analysis (issued within the last 6 months, signed)", "Financial stability statement (issued within the last 12 months, signed)", "Supplier self-assessment report (issued within the last 12 months, signed)", "Certified quality management system certificate (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Orrwood Ltd", "reference": "EW-86026", "details": ["The supplier carries out all production in-house."]}, "documents received": ["Supplier self-assessment report for Orrwood Ltd, dated 7 September 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Certified quality management system certificate for Orrwood Ltd, with an expiry date of 7 September 2026. Single page.", "Supplier quality questionnaire for Orrwood Ltd, dated 7 May 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Raw material certificate of analysis for Orrwood Ltd, dated 9 February 2026. 2 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every checklist line relevant to this case. A required document only counts if it is the kind of document listed (not a similar one), concerns the subject of the case, contains all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. Say complete: every applicable line is met (extra documents do not matter). Say incomplete: at least one applicable line is not met. Say unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-14", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 696}} {"id": "isc-te-00430-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Quelston Ltd", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "13 March 2026"}, "checklist": ["If the researcher will work outside standard opening hours, also: out-of-hours access authorisation (signed)", "insurance declaration for facility work (issued within the last 12 months, signed)", "photo identity document (valid (not expired) on the date of the review)", "radiation safety training certificate (issued within the last 24 months, signed)", "home institution endorsement letter (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Faisal Ebbopoulos", "reference": "VC-78895", "details": ["The researcher will work only during standard opening hours."]}, "documents received": ["Radiation safety training certificate, in the name of Faisal Ebbopoulos, dated 3 September 2024. 1 page, signed by the radiation safety officer.", "Experiment safety clearance form, in the name of Faisal Ebbopoulos, dated 1 February 2026. 3 pages, complete, signed by the host scientist.", "Host scientist invitation letter, in the name of Faisal Ebbopoulos, dated 19 November 2025. 1 page, signed by the host scientist.", "Insurance declaration for facility work, in the name of Faisal Ebbopoulos, dated 1 July 2025. 1 page, signed by the visiting researcher.", "Home institution endorsement letter, in the name of Faisal Ebbopoulos, dated 27 December 2025. 1 page, signed by the head of department."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 748}} {"id": "isc-te-00291-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Aldwick Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "14 July 2026"}, "checklist": ["Check for the thermostat calibration certificate, issued within the last 12 months.", "Check for the plant room access sign-in sheet.", "Check for the refrigerant top-up log, issued within the last 1 months and signed.", "Check for the asset condition photograph sheet, issued within the last 1 months.", "Check for the engineer's service report, issued within the last 1 months and signed.", "If the system contains more than 5 tonnes of refrigerant, also check for the fixed leak detection test certificate, issued within the last 6 months and signed."], "submission": {"case": {"name": "air conditioning system SL-89503", "reference": "NG-66391", "details": ["The system contains more than 5 tonnes of refrigerant."]}, "documents received": ["System pressure test results SL-89503.pdf: System pressure test results for air conditioning system SL-89503, dated 8 July 2026; 2 pages, complete, signed by the service engineer.", "Refrigerant top-up log SL-89503.pdf: A single-page refrigerant top-up log for air conditioning system SL-89503, dated 25 June 2026, signed by the service engineer.", "Fixed leak detection test certificate SL-89503.pdf: A fixed leak detection test certificate for air conditioning system SL-89503, dated 16 February 2026; 2 pages, complete, signed by the leak detection engineer.", "Asset condition photograph sheet SL-89503.pdf: An asset condition photograph sheet for air conditioning system SL-89503, dated 30 June 2026; 2 pages, complete.", "Thermostat calibration certificate SL-89503.pdf: A single-page thermostat calibration certificate for air conditioning system SL-89503, dated 4 November 2025.", "Engineer's service report SL-89503.pdf: An engineer's service report for air conditioning system SL-89503, dated 25 June 2026; 3 pages, complete, signed by the service engineer.", "Old refrigerant log 2025 SL-89503.pdf: A single-page old refrigerant log from a previous year for air conditioning system SL-89503, dated 25 June 2026, signed by the site technician.", "Plant room access sign-in sheet SL-89503.pdf: A single-page plant room access sign-in sheet for air conditioning system SL-89503, dated 25 June 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1010}} {"id": "isc-te-00314-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Marlgard GmbH", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "1 June 2026"}, "checklist": ["If the transfer is an international movement, also: transit customs document (signed)", "load consolidation sheet (issued within the last 3 months, signed)", "seal number log (issued within the last 1 months, signed)", "damaged goods exception sheet (issued within the last 1 months, signed)", "transfer manifest (signed)"], "submission": {"case": {"name": "cross-dock transfer CD-54159", "reference": "GL-47907"}, "documents received": ["seal_number_log_CD-54159.pdf. Seal number log for cross-dock transfer CD-54159, dated 17 May 2026. 1 page. Signed by the depot security officer.", "inbound_unloading_record_CD-54159.pdf. Inbound unloading record for cross-dock transfer CD-54159, dated 19 May 2026. 1 page. Signed by the inbound unloading team lead.", "transfer_manifest_CD-54159.pdf. Transfer manifest for cross-dock transfer CD-54159, dated 13 March 2026. 3 pages, complete. Signed by the transport planner.", "damaged_goods_exception_sheet_CD-54159.pdf. Damaged goods exception sheet for cross-dock transfer CD-54159, dated 28 May 2026. 1 page. Signed by the warehouse shift supervisor.", "load_consolidation_sheet_CD-54159.pdf. Load consolidation sheet for cross-dock transfer CD-54159, dated 25 April 2026. 2 pages, complete. Signed by the load consolidation planner.", "outbound_loading_record_CD-54159.pdf. Outbound loading record for cross-dock transfer CD-54159, dated 28 May 2026. 1 page. Signed by the outbound loading team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 848}} {"id": "isc-te-00064-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Rondgard Ltd", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "8 June 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Visa entry requirement printout (issued within the last 3 months)", "Travel request form (signed)", "Flight itinerary quote (issued within the last 1 months)", "Hotel booking confirmation"], "submission": {"case": {"name": "business trip WO-61646", "reference": "UY-28386"}, "documents received": ["Flight itinerary quote for business trip WO-61646. It shows a date of issue of 28 May 2026. 2 pages, complete.", "Travel request form for business trip WO-61646. It shows a date of issue of 17 February 2026. 2 pages, complete. It is signed by the line manager.", "Hotel booking confirmation for business trip WO-61646. It shows a date of issue of 25 May 2026. 2 pages, complete.", "Visa entry requirement printout for business trip WO-61646. It shows a date of issue of 14 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "variant-74", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 679}} {"id": "isc-te-00419-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Quelmere Inc", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "23 June 2026"}, "checklist": ["Passport, valid (not expired) on the date of the review: 23 June 2026.", "Three months of bank statements, issued within the last 3 months.", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months, signed.", "Mortgage application form, issued within the last 3 months, signed.", "Gifted deposit letter, issued within the last 3 months, signed."], "submission": {"case": {"name": "Freya Moskwick", "reference": "QS-74483", "details": ["The borrower is not self-employed."]}, "documents received": ["p60_tax_summary_moskwick.pdf - P60 tax summary for Freya Moskwick. It shows a date of issue of 25 September 2025. 2 pages, complete.", "passport_moskwick.pdf - Passport for Freya Moskwick. It shows an expiry date of 21 August 2027. 2 pages, complete.", "bank_statements_moskwick.pdf - Three months of bank statements for Freya Moskwick. They show a date of issue of 14 April 2026. 9 pages, complete.", "proof_of_deposit_savings_moskwick.pdf - Proof of deposit savings for Freya Moskwick. It shows a date of issue of 12 May 2026. 2 pages, complete.", "mortgage_application_form_moskwick.pdf - Mortgage application form for Freya Moskwick. It shows a date of issue of 2 April 2026. 10 pages, complete. It is signed by the borrower, Freya Moskwick.", "gifted_deposit_letter_moskwick.pdf - Gifted deposit letter for Freya Moskwick. It shows a date of issue of 17 May 2026. It is a single page. It is signed by the donor of the gift."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 654}} {"id": "isc-te-00335-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Dravwater Ltd", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "13 May 2026"}, "checklist": ["Check for proof of national insurance number.", "Check for proof of earnings, issued within the last 1 months.", "Check for proof of identity, valid (not expired) on the date of the review.", "Check for rent book or rent payment schedule, issued within the last 2 months.", "Check for proof of savings, issued within the last 2 months.", "Check for current tenancy agreement, signed."], "submission": {"case": {"name": "Daniel Nebbford", "reference": "YX-55936"}, "documents received": ["Current tenancy agreement for Daniel Nebbford. Date of issue: 30 January 2026. 12 pages, complete. Signed by the landlord.", "Proof of savings for Daniel Nebbford. Date of issue: 14 April 2026. 2 pages, complete.", "Rent book or rent payment schedule for Daniel Nebbford. Date of issue: 3 May 2026. 4 pages, complete.", "Proof of earnings for Daniel Nebbford. Date of issue: 6 May 2026. 2 pages, complete.", "Recent bank statements for Daniel Nebbford. Date of issue: 11 April 2026. 12 pages, complete.", "Proof of identity for Daniel Nebbford. Expiry date: 29 October 2026. 1 page.", "Proof of national insurance number for Daniel Nebbford. Date of issue: 18 April 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00237-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Baxside Limited", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "16 March 2026"}, "checklist": ["Bank interest statement issued within the last 13 months", "Pension contribution certificate issued within the last 13 months", "Capital gains asset record", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Tax return draft printout, signed", "Childcare payment receipt issued within the last 13 months"], "submission": {"case": {"name": "household tax affairs MV-6666", "reference": "AI-52954", "details": ["The household sold no property other than its main home during the tax year."]}, "documents received": ["childcare-payment-receipt-MV-6666-12feb2025.pdf - Childcare payment receipt for household tax affairs MV-6666. Date of issue: 12 February 2025. Single page.", "bank-interest-statement-MV-6666.pdf - Bank interest statement for household tax affairs MV-6666. Date of issue: 25 January 2026. 3 pages, complete.", "pension-contribution-certificate-MV-6666.pdf - Pension contribution certificate for household tax affairs MV-6666. Date of issue: 26 January 2026. 2 pages, complete.", "capital-gains-asset-record-MV-6666.pdf - Capital gains asset record for household tax affairs MV-6666. Date of issue: 28 December 2025. 2 pages, complete.", "tax-return-draft-printout-MV-6666.pdf - Tax return draft printout for household tax affairs MV-6666. Date of issue: 8 December 2025. 6 pages, complete. Signed by the filer.", "employment-income-summary-MV-6666.pdf - Employment income summary for household tax affairs MV-6666. Date of issue: 17 March 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine whether the checklist is fully satisfied by the pack. Go over every checklist line that applies to this case. A required document counts only when it is the kind of document the checklist lists (not merely a similar one), when it is about the case's subject, when it has all its pages, when it is signed wherever the checklist asks for a signature, when it has not expired as of the review date, and when it was issued within the period the checklist allows. Only if its circumstance holds for the case does a conditional line apply. complete: each applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example because a needed date, signature or page count is not visible, because a document's kind cannot be told, or because the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves are what you must judge.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-53", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 896}} {"id": "isc-te-00480-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Zervshaw Inc", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "29 June 2026"}, "checklist": ["Photographs of flood water in the rooms, issued within the last 1 months", "Flood claim form, signed", "Loss adjuster's inspection report, issued within the last 6 months and signed", "Council flood warning notice, issued within the last 12 months", "If the property is a listed building, also: listed building consent for the repairs, signed", "Debris removal invoice, issued within the last 6 months"], "submission": {"case": {"name": "property TS-49863", "reference": "IK-32131", "details": ["The property is a listed building."]}, "documents received": ["Council flood warning notice for property TS-49863, dated 16 August 2025. 1 page.", "Listed building consent for the repairs at property TS-49863, dated 2 June 2026. 2 pages, complete. Signed by the council planning officer.", "Photographs of flood water in the rooms relating to property TS-49863, dated 26 June 2026. 3 pages, complete.", "Debris removal invoice for property TS-49863, dated 15 January 2026. 1 page.", "Flood claim form for property TS-49863, dated 24 May 2026. 5 pages, complete. Signed by the policyholder.", "Loss adjuster's inspection report for property TS-49863, dated 10 April 2026. 6 pages, complete. Signed by the loss adjuster."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 776}} {"id": "isc-te-00347-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Vaskcliff SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "16 April 2026"}, "checklist": ["Check that the customer contact details sheet is present and signed.", "Check that the terms and conditions acceptance sheet is present and signed.", "Check that the identity verification document is present and valid, meaning not expired, on the date of the review.", "Check that the initial points balance statement is present and was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also check the points transfer evidence statement, which must have been issued within the last 3 months and be signed.", "Check that the marketing consent form is present and signed.", "Check that the nominated store preference form is present and signed."], "submission": {"case": {"name": "Eoin Natwick", "reference": "KR-35713", "details": ["The customer is not transferring points from any other scheme."]}, "documents received": ["identity_verification_document_natwick_02.pdf. Identity verification document for Eoin Natwick. The expiry date is covered by a stamp and cannot be read. It is a single page.", "nominated_store_preference_form_natwick.pdf. Nominated store preference form for Eoin Natwick, dated 25 February 2026. A single page, signed by the customer.", "terms_and_conditions_acceptance_sheet_natwick.pdf. Terms and conditions acceptance sheet for Eoin Natwick, dated 22 February 2026. A single page, signed by the customer.", "marketing_consent_form_natwick.pdf. Marketing consent form for Eoin Natwick, dated 22 January 2026. A single page, signed by the customer.", "customer_contact_details_sheet_natwick.pdf. Customer contact details sheet for Eoin Natwick, dated 1 January 2026. A single page, signed by the customer.", "initial_points_balance_statement_natwick.pdf. Initial points balance statement for Eoin Natwick, dated 6 April 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Work through every checklist line that applies to this case one by one. For a required document to count, it must be the exact kind of document listed (not a similar one), be about the subject of the case, contain all its pages, be signed where the checklist asks for a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line only applies when its circumstance holds for the case. complete: all applicable lines are met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-68", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 842}} {"id": "isc-te-00157-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Morvholm SAS", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "6 March 2026"}, "checklist": ["Financial assessment form, signed.", "If the adult owns property that could be considered in the financial assessment, also: property valuation report, issued within the last 12 months and signed.", "Benefit entitlement letters, issued within the last 12 months.", "Capacity assessment record, signed.", "Proof of identity, valid (not expired) on the date of the review.", "Support plan, signed."], "submission": {"case": {"name": "Dimitris Yellani", "reference": "RL-43050", "details": ["The adult owns property that could be considered in the financial assessment."]}, "documents received": ["Benefit entitlement letters - Dimitris Yellani.pdf. Benefit entitlement letters for Dimitris Yellani, dated 2 August 2025. 2 pages, complete.", "Proof of identity - Dimitris Yellani.pdf. Single-page proof of identity for Dimitris Yellani. The date of issue is smudged and cannot be read.", "Safeguarding referral form - Dimitris Yellani.pdf. Safeguarding referral form for Dimitris Yellani, dated 21 December 2025. 2 pages, complete. Signed by the referring officer.", "Capacity assessment record - Dimitris Yellani.pdf. Capacity assessment record for Dimitris Yellani, dated 23 November 2025. 4 pages, complete. Signed by the assessor.", "Financial assessment form - Dimitris Yellani.pdf. Financial assessment form for Dimitris Yellani, dated 31 January 2026. 6 pages, complete. Signed by the adult.", "Property valuation report - Dimitris Yellani.pdf. Property valuation report for Dimitris Yellani, dated 7 August 2025. 2 pages, complete. Signed by the valuer.", "Support plan - Dimitris Yellani.pdf. Support plan for Dimitris Yellani, dated 27 January 2026. 6 pages, complete. Signed by the support planner."]}}, "question": {"type": "choice", "instructions": "Determine whether the checklist is fully satisfied by the pack. Go over every checklist line that applies to this case. A required document counts only when it is the kind of document the checklist lists (not merely a similar one), when it is about the case's subject, when it has all its pages, when it is signed wherever the checklist asks for a signature, when it has not expired as of the review date, and when it was issued within the period the checklist allows. Only if its circumstance holds for the case does a conditional line apply. complete: each applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example because a needed date, signature or page count is not visible, because a document's kind cannot be told, or because the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves are what you must judge.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-53", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 888}} {"id": "isc-te-00387-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Oxlfell Group", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "22 July 2026"}, "checklist": ["Confirm the pack contains a contact plan for time away.", "Confirm the pack contains a handover note, signed.", "If the employee is requesting leave during a known busy period, also: confirm the pack contains a business case for peak-period leave, signed.", "Confirm the pack contains a team holiday planner extract.", "Confirm the pack contains a manager approval email issued within the last 2 months."], "submission": {"case": {"name": "Gustavo Rookton", "reference": "VB-36010", "details": ["The employee is not requesting leave during a known busy period."]}, "documents received": ["Contact plan for time away. The plan covers Gustavo Rookton and shows its date of issue as 11 July 2026. It is a single page.", "Statutory holiday entitlement confirmation. The confirmation concerns Gustavo Rookton and shows its date of issue as 7 May 2026. It is a single page.", "Team holiday planner extract. The extract concerns Gustavo Rookton and shows its date of issue as 11 May 2026. It runs to 2 pages, complete.", "Manager approval email. The email concerns Gustavo Rookton and shows its date of issue as 14 May 2026. It is a single page.", "Handover note. The note concerns Gustavo Rookton and shows its date of issue as 29 May 2026. It runs to 2 pages, complete, and is signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 742}} {"id": "isc-te-00262-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Baxberg Inc", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "24 March 2026"}, "checklist": ["Privacy policy update, issued within the last 3 months.", "Age rating questionnaire, signed.", "Crash-free rate report, issued within the last 1 months.", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months, signed.", "Release notes, issued within the last 1 months.", "Store listing description, issued within the last 1 months.", "Marketing screenshot pack."], "submission": {"case": {"name": "mobile app release KP-37893", "reference": "MT-55379", "details": ["The mobile app release includes no third-party analytics."]}, "documents received": ["KP-37893_release_notes_18022026.pdf — Release notes for mobile app release KP-37893, dated 18 February 2026. 2 pages, complete.", "KP-37893_store_listing_description.pdf — A store listing description for mobile app release KP-37893, dated 7 March 2026. A single page.", "KP-37893_localisation_completeness_report.pdf — A localisation completeness report for mobile app release KP-37893, dated 16 March 2026. 2 pages, complete.", "KP-37893_age_rating_questionnaire.pdf — An age rating questionnaire for mobile app release KP-37893, dated 26 January 2026. It carries the signature of the release manager. 2 pages, complete.", "KP-37893_privacy_policy_update.pdf — A privacy policy update for mobile app release KP-37893, dated 14 January 2026. 2 pages, complete.", "KP-37893_marketing_screenshot_pack.pdf — A marketing screenshot pack for mobile app release KP-37893, dated 23 January 2026. 6 pages, complete.", "KP-37893_crash_free_rate_report.pdf — A crash-free rate report for mobile app release KP-37893, dated 12 March 2026. A single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 912}} {"id": "isc-te-00322-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Larvmoor Inc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "2 April 2026"}, "checklist": ["Confirm the pack includes the account closure procedure.", "Confirm the pack includes a two-factor authentication confirmation issued within the last 3 months.", "Confirm the pack includes a signed platform terms acceptance record.", "Confirm the pack includes a signed account request form.", "Confirm the pack includes a signed naming convention approval."], "submission": {"case": {"name": "new social media account FX-38776", "reference": "AG-45011"}, "cover note": "I am not sure everything needed is in this pack, so please take a careful look before we go any further.", "documents received": ["naming_convention_approval_FX-38776.pdf. Naming convention approval for new social media account FX-38776. It is dated 1 January 2026, is a single page and is signed by the social media governance lead.", "account_request_form_FX-38776.pdf. Account request form for new social media account FX-38776. It is dated 21 March 2026, is a single page and is signed by the requesting marketing manager.", "two_factor_authentication_confirmation_FX-38776_v7.pdf. Two-factor authentication confirmation for new social media account FX-38776. It is dated 15 January 2026 and is a single page.", "platform_terms_acceptance_record_FX-38776.pdf. Platform terms acceptance record for new social media account FX-38776. It is dated 17 January 2026, is a single page and is signed by the social media manager.", "account_closure_procedure_FX-38776.pdf. Account closure procedure for new social media account FX-38776. It is dated 21 December 2025 and is a single page.", "account_purpose_statement_FX-38776.pdf. Account purpose statement for new social media account FX-38776. It is dated 27 January 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 871}} {"id": "isc-te-00113-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Xanwald SAS", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "24 June 2026"}, "checklist": ["System pressure test results, issued within the last 1 months, signed", "If the system contains more than 5 tonnes of refrigerant, also: fixed leak detection test certificate, issued within the last 6 months, signed", "Plant room access sign-in sheet", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "Thermostat calibration certificate, issued within the last 12 months", "Asset condition photograph sheet, issued within the last 1 months"], "submission": {"case": {"name": "air conditioning system PS-44263", "reference": "MV-14815", "details": ["The system contains more than 5 tonnes of refrigerant."]}, "documents received": ["PS-44263_plant_room_access_sign_in_sheet_120526.pdf. Plant room access sign-in sheet for air conditioning system PS-44263, dated 12 May 2026. 1 page.", "PS-44263_system_pressure_test_results_070626.pdf. System pressure test results for air conditioning system PS-44263, dated 7 June 2026. 2 pages, complete. Signed by the commissioning engineer.", "PS-44263_engineer_F_gas_handling_certificate_20102028.pdf. Engineer F-gas handling certificate for air conditioning system PS-44263, showing an expiry date of 20 October 2028. 1 page.", "PS-44263_thermostat_calibration_certificate_160725.pdf. Thermostat calibration certificate for air conditioning system PS-44263, dated 16 July 2025. 1 page.", "PS-44263_F_gas_leak_check_record_020426.pdf. F-gas leak check record for air conditioning system PS-44263, dated 2 April 2026. 2 pages, complete. Signed by the F-gas certified engineer.", "PS-44263_asset_condition_photograph_sheet_030626_v2.pdf. Asset condition photograph sheet for air conditioning system PS-44263, dated 3 June 2026. Pages 1-1 of 2 are included, so only 1 of its 2 pages is in the pack.", "PS-44263_fixed_leak_detection_test_certificate_010226.pdf. Fixed leak detection test certificate for air conditioning system PS-44263, dated 1 February 2026. 2 pages, complete. Signed by the leak detection engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1019}} {"id": "isc-te-00449-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Yselfell Limited", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "3 July 2026"}, "checklist": ["Confirm the boarding pass stub is present.", "Confirm the expense claim form is present and signed.", "Confirm the hotel invoice is present and issued within the last 6 months.", "Confirm the conference fee invoice is present and issued within the last 12 months.", "If the claim exceeds the limit that requires director sign-off, also confirm the director approval slip is present, issued within the last 3 months and signed."], "submission": {"case": {"name": "Aoife Brodisey", "reference": "RQ-48538", "details": ["The claim exceeds the limit that requires director sign-off."]}, "cover note": "I apologise that this pack was put together in a rush. Please let me know if anything needs clarifying. Kind regards, Camille Brodova", "documents received": ["Boarding pass stub - Aoife Brodisey.pdf - Boarding pass stub for Aoife Brodisey. Date of issue: 13 June 2026. 1 page.", "Restaurant receipt - Aoife Brodisey.pdf - Restaurant receipt for Aoife Brodisey. Date of issue: 28 April 2026. 1 page.", "Expense claim form - Aoife Brodisey.pdf - Expense claim form for Aoife Brodisey. Date of issue: 19 May 2026. 2 pages, complete. Signed by the claiming employee.", "Conference fee invoice - Aoife Brodisey.pdf - Conference fee invoice for Aoife Brodisey. Date of issue: 20 August 2025. 1 page.", "Hotel invoice - Aoife Brodisey.pdf - Hotel invoice for Aoife Brodisey. Date of issue: 7 June 2026. 2 pages, complete.", "Director approval slip - Aoife Brodisey.pdf - Director approval slip for Aoife Brodisey. Date of issue: 20 May 2026. 1 page. Signed by the director."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 660}} {"id": "isc-te-00335-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Dravwater Ltd", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "13 May 2026"}, "checklist": ["Check for proof of national insurance number.", "Check for proof of earnings, issued within the last 1 months.", "Check for proof of identity, valid (not expired) on the date of the review.", "Check for rent book or rent payment schedule, issued within the last 2 months.", "Check for proof of savings, issued within the last 2 months.", "Check for current tenancy agreement, signed."], "submission": {"case": {"name": "Daniel Nebbford", "reference": "YX-55936"}, "cover note": "Please note this pack was already checked by a colleague. Happy to help if anything further is needed.", "documents received": ["Proof of earnings for Daniel Nebbford. Date of issue: 6 May 2026. 2 pages, complete.", "Proof of national insurance number for Daniel Nebbford. Date of issue: 18 April 2026. 1 page.", "Rent book or rent payment schedule for Daniel Nebbford. Date of issue: 3 May 2026. 4 pages, complete.", "Proof of identity for Daniel Nebbford. Expiry date: 29 October 2026. 1 page.", "Current tenancy agreement for Daniel Nebbford. Date of issue: 30 January 2026. 12 pages, complete. Signed by the landlord."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 714}} {"id": "isc-te-00050-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Wilmmouth Ltd", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "19 June 2026"}, "checklist": ["Account purpose statement is included.", "Signed platform terms acceptance record is included.", "Signed account request form is included.", "Two-factor authentication confirmation is included, issued within the last 3 months.", "If the account will post content about financial products, also: financial promotions approval note, issued within the last 3 months and signed."], "submission": {"case": {"name": "new social media account JE-72058", "reference": "TC-88544", "details": ["The account will not post any content about financial products."]}, "documents received": ["Admin access list for new social media account JE-72058. Dated 19 May 2026. Single page.", "Account purpose statement for new social media account JE-72058. Dated 17 March 2026. Single page.", "Platform terms acceptance record for new social media account JE-72058. Dated 17 April 2026 and signed by the social media manager. Single page.", "Two-factor authentication confirmation for new social media account JE-72058. Dated 10 June 2026. Single page.", "Account request form for new social media account JE-72058. Dated 25 March 2026 and signed by the account requester. Single page.", "File 0004.pdf. The contents cannot be seen, as the scan is blank."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 737}} {"id": "isc-te-00421-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Briskcliff LLP", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "3 June 2026"}, "checklist": ["Travel policy acknowledgement, signed.", "Line manager approval, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Trip cost estimate, signed.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Travel request form, signed."], "submission": {"case": {"name": "business trip WR-16880", "reference": "LV-18491", "details": ["The trip involves no country requiring a visa."]}, "documents received": ["Passport copy for international travel for business trip WR-16880. Expiry date 27 August 2027. Single page.", "Line manager approval for business trip WR-16880, issued 16 March 2026. Single page. Signed by the line manager.", "Travel policy acknowledgement for business trip WR-16880, issued 2 May 2026. Single page. Signed by the employee.", "Document 0911.pdf. The file will not open, so its contents cannot be seen.", "Trip cost estimate for business trip WR-16880, issued 29 April 2026. Single page. Signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 692}} {"id": "isc-te-00398-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Prydhaven Ltd", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "3 July 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include the mediation request confirmation, issued within the last 1 months and signed", "Cure period expiry calculation, issued within the last 1 months and signed", "Losses calculation statement, issued within the last 1 months and signed", "Breach evidence log, issued within the last 1 months and signed", "Default notice previously served, issued within the last 6 months and signed", "Termination clause legal opinion, issued within the last 1 months and signed", "Original service agreement copy"], "submission": {"case": {"name": "Aldstow Group", "reference": "KZ-59584", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Default_notice_previously_served_Aldstow_Group_16_June_2026.pdf — Default notice previously served on Aldstow Group, dated 16 June 2026. 1 page. Signed by the Contracts Manager.", "Termination_clause_legal_opinion_Aldstow_Group_1_July_2026.pdf — Termination clause legal opinion concerning Aldstow Group, dated 1 July 2026. 5 pages, complete. Signed by the Legal Counsel.", "Breach_evidence_log_Aldstow_Group_13_June_2026.pdf — Breach evidence log concerning Aldstow Group, dated 13 June 2026. 6 pages, complete. The signature line is empty; the document is not signed.", "Original_service_agreement_copy_Aldstow_Group_23_April_2026.pdf — Original service agreement copy concerning Aldstow Group, dated 23 April 2026. 10 pages, complete.", "Losses_calculation_statement_Aldstow_Group_13_June_2026.pdf — Losses calculation statement concerning Aldstow Group, dated 13 June 2026. 3 pages, complete. Signed by the Finance Director.", "Mediation_request_confirmation_Aldstow_Group_29_June_2026.pdf — Mediation request confirmation concerning Aldstow Group, dated 29 June 2026. 1 page. Signed by the Head of Dispute Resolution.", "Cure_period_expiry_calculation_Aldstow_Group_18_June_2026.pdf — Cure period expiry calculation concerning Aldstow Group, dated 18 June 2026. 2 pages, complete. Signed by the Contracts Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 977}} {"id": "isc-te-00047-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Teskbrook GmbH", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "17 March 2026"}, "checklist": ["Check that the audit summary report is present and signed.", "Check that the audit finding sheets are present and signed.", "Check that the internal audit plan is present, was issued within the last 12 months, and is signed.", "Check that the management review minutes are present and signed.", "If the audit found a major non-conformity, also check that the major non-conformity corrective action plan is present and signed."], "submission": {"case": {"name": "internal audit HH-1805", "reference": "IG-20637", "details": ["The audit found a major non-conformity."]}, "documents received": ["Management review minutes HH-1805. Issued 13 February 2026, 4 pages, complete. Signed by the chair of the review board.", "Audit summary report HH-1805. Issued 3 February 2026, 5 pages, complete. Signed by the lead auditor.", "Audit finding sheets HH-1805. Issued 1 January 2026, 2 pages, complete. Signed by the lead auditor.", "Major non-conformity corrective action plan HH-1805. Issued 10 December 2025, 3 pages, complete. Signed by the quality manager.", "Internal audit plan HH-1805. The date of issue is covered by a stamp. 2 pages, complete. Signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00193-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Wilmfield SAS", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "30 March 2026"}, "checklist": ["Photo identification, valid (not expired) on the date of the review", "Lost card declaration, signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "Fraud questionnaire, signed", "Card replacement request form, signed", "Confirmation of contact details, issued within the last 3 months"], "submission": {"case": {"name": "Omar Tadock", "reference": "OH-47944", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["card_replacement_request_tadock_oh47944.pdf - Card replacement request form for Omar Tadock. It shows a date of issue of 19 February 2026. 2 pages, complete. It is signed by Omar Tadock.", "lost_card_declaration_tadock_oh47944.pdf - Lost card declaration for Omar Tadock. It shows a date of issue of 19 January 2026. 1 page, with the signature line empty and not signed.", "fraud_questionnaire_tadock_oh47944.pdf - Fraud questionnaire for Omar Tadock. It shows a date of issue of 10 January 2026. 2 pages, complete. It is signed by Omar Tadock.", "photo_id_tadock_oh47944.pdf - Photo identification for Omar Tadock. It shows an expiry date of 4 May 2027. 1 page.", "overseas_address_form_tadock_oh47944.pdf - Temporary overseas address registration form for Omar Tadock. It shows a date of issue of 22 February 2026. 1 page, signed by Omar Tadock.", "contact_details_confirmation_tadock_oh47944.pdf - Confirmation of contact details for Omar Tadock. It shows a date of issue of 11 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 849}} {"id": "isc-te-00088-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Aldmouth Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "23 April 2026"}, "checklist": ["Customer deposit receipt, issued within the last 3 months.", "Package holiday brochure page.", "Booking request form, signed.", "Travel insurance quote, issued within the last 1 months.", "Passport details form, signed.", "If the booking includes a car hire, also: car hire quotation, issued within the last 1 months.", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review."], "submission": {"case": {"name": "holiday booking HK-33923", "reference": "LS-73051", "details": ["The booking includes a car hire.", "The booking includes a child traveller."]}, "documents received": ["Booking request form for holiday booking HK-33923. Date of issue: 6 January 2026. Pages 1-1 of 2. Signed by the customer.", "Child passport copy for holiday booking HK-33923. Expiry date: 20 February 2028. 1 page.", "Flight availability printout for holiday booking HK-33923. Date of issue: 12 April 2026. 2 pages, complete.", "Hotel availability printout for holiday booking HK-33923. Date of issue: 5 April 2026. 2 pages, complete. Signed by the reservations clerk.", "Package holiday brochure page for holiday booking HK-33923. Date of issue: 17 January 2026. 1 page.", "Travel insurance quote for holiday booking HK-33923. Date of issue: 10 April 2026. 2 pages, complete.", "Passport details form for holiday booking HK-33923. Date of issue: 10 April 2026. 1 page. Signed by the customer.", "Customer deposit receipt for holiday booking HK-33923. Date of issue: 10 April 2026. 1 page.", "Car hire quotation for holiday booking HK-33923. Date of issue: 11 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 901}} {"id": "isc-te-00153-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jorwell Partners", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "22 May 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Travel request form (signed)", "Passport copy for international travel (valid (not expired) on the date of the review)", "Flight itinerary quote (issued within the last 1 months)", "Visa entry requirement printout (issued within the last 3 months)", "Trip cost estimate (signed)", "Travel policy acknowledgement (signed)"], "submission": {"case": {"name": "business trip SC-57627", "reference": "VR-75039", "details": ["The traveller is not a passport holder of the destination country."]}, "documents received": ["Travel request form for business trip SC-57627. Dated 3 April 2026. 2 pages, complete. Signed by the traveller.", "Travel policy acknowledgement for business trip SC-57627. Dated 2 February 2026. Single page. Signed by the traveller.", "Flight itinerary quote for business trip SC-57627. Dated 18 May 2026. 2 pages, complete.", "Passport copy for international travel for business trip SC-57627. Passport expiry date: 22 November 2027. Single page.", "Trip cost estimate for business trip SC-57627. Dated 10 April 2026. Single page. Signed by the line manager.", "Visa entry requirement printout for business trip SC-57627. Dated 15 May 2026. Pages 1-1 of 2.", "Work permit confirmation for business trip SC-57627. Dated 30 April 2026. 2 pages, complete.", "Line manager approval for business trip SC-57627. Dated 2 May 2026. Single page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide. Review each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Give complete if every applicable line is met (extra documents do not matter). Give incomplete if at least one applicable line is not met. Give unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-25", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 852}} {"id": "isc-te-00423-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pentmont Group", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 May 2026"}, "checklist": ["Line manager approval, signed.", "Visa entry requirement printout, issued within the last 3 months.", "Hotel booking confirmation.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Flight itinerary quote, issued within the last 1 months."], "submission": {"case": {"name": "business trip NZ-61217", "reference": "SD-60329", "details": ["The trip involves travel to a country requiring a visa."]}, "documents received": ["Line manager approval for business trip NZ-61217, dated 27 April 2026, 1 page, signed by the line manager.", "Visa approval letter for business trip NZ-61217, dated 16 March 2026, 2 pages, complete.", "Travel policy acknowledgement for business trip NZ-61217, dated 19 May 2026, 1 page, signed by the employee.", "Passport copy for international travel for business trip NZ-61217, showing an expiry date of 13 June 2027, 1 page.", "Hotel booking confirmation for business trip NZ-61217, dated 6 February 2026, 2 pages, complete.", "Flight itinerary quote for business trip NZ-61217, dated 23 May 2026, 2 pages, complete.", "Visa entry requirement printout for business trip NZ-61217, dated 20 May 2026, 2 pages, complete.", "Trip cost estimate for business trip NZ-61217, dated 15 May 2026, 1 page, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 824}} {"id": "isc-te-00091-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Stervside plc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "3 August 2026"}, "checklist": ["Shared mailbox handover record, issued within the last 1 months and signed", "Leaver notification form, signed", "Service desk ticket closure summary, issued within the last 1 months", "Access rights inventory, issued within the last 1 months", "Non-disclosure reminder acknowledgement, signed"], "submission": {"case": {"name": "Siobhan Foskthwaite", "reference": "HW-35438"}, "cover note": "Colleague already reviewed this pack before it reached you. Robert Wraxisey sending it over for the team's records.", "documents received": ["shared_mailbox_handover_record_HW-35438.pdf — Shared mailbox handover record for Siobhan Foskthwaite. Dated 20 July 2026. 2 pages, complete, signed by the departing employee.", "leaver_notification_form_HW-35438.pdf — Leaver notification form for Siobhan Foskthwaite. Dated 27 April 2026. 2 pages, complete, signed by the line manager.", "access_rights_inventory_Carmen_Orvsen.pdf — Access rights inventory for Carmen Orvsen. Dated 20 July 2026. 4 pages, complete.", "service_desk_ticket_closure_summary_HW-35438.pdf — Service desk ticket closure summary for Siobhan Foskthwaite. Dated 22 July 2026. 3 pages, complete.", "non_disclosure_reminder_acknowledgement_HW-35438.pdf — Non-disclosure reminder acknowledgement for Siobhan Foskthwaite. Dated 9 July 2026. Single page, signed by the departing employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00162-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Stromhurst Inc", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "22 June 2026"}, "checklist": ["Photo identity document, valid (not expired) on the date of the review", "Experiment safety clearance form, signed", "If the researcher will bring their own samples, also: Sample import declaration for facility, signed", "Radiation safety training certificate, issued within the last 24 months, signed", "Host scientist invitation letter, issued within the last 6 months, signed", "Facility access application form, signed"], "submission": {"case": {"name": "Siobhan Nebbaker", "reference": "YX-47968", "details": ["The researcher will bring their own samples."]}, "cover note": "Hello, I have put together this pack for Siobhan Nebbaker's facility access badge, but I am not sure everything needed is there. Could you check it and let me know if anything else is required? Thanks, Andrew Vintham", "documents received": ["Insurance declaration for facility work for Siobhan Nebbaker. Date of issue: 25 December 2025. Single page. Signed by the visiting researcher's home institution insurance officer.", "Experiment safety clearance form for Siobhan Nebbaker. Date of issue: 10 March 2026. 3 pages, complete. Signed by the facility safety officer.", "Photo identity document for Siobhan Nebbaker. Expiry date: 4 July 2026. Single page.", "Facility access application form for Siobhan Nebbaker. Date of issue: 27 March 2026. 2 pages, complete. Signed by the visiting researcher.", "Photo identity document for Siobhan Nebbaker. Expiry date: 5 December 2024. Single page.", "Host scientist invitation letter for Siobhan Nebbaker. Date of issue: 26 April 2026. Single page. Signed by the host scientist.", "Sample import declaration for facility for Siobhan Nebbaker. Date of issue: 16 May 2026. 2 pages, complete. Signed by the visiting researcher.", "Radiation safety training certificate for Siobhan Nebbaker. Date of issue: 21 October 2025. Single page. Signed by the radiation safety training coordinator."]}}, "question": {"type": "choice", "instructions": "The decision to make is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves, not the notes.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "variant-43", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 915}} {"id": "isc-te-00092-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Aldness Partners", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "25 May 2026"}, "checklist": ["Leaver notification form, signed", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed", "Non-disclosure reminder acknowledgement, signed", "Service desk ticket closure summary, issued within the last 1 months", "Equipment return receipt, issued within the last 1 months, signed", "Final payroll cut-off note, issued within the last 1 months, signed", "Line manager confirmation, issued within the last 1 months, signed"], "submission": {"case": {"name": "Vikram Brodard", "reference": "VR-80988", "details": ["The leaver held no privileged administrator accounts."]}, "cover note": "Everything needed for this pack is attached and complete.", "documents received": ["Shared_mailbox_handover_Brodard_20260518.pdf. A shared mailbox handover record for Vikram covering Vikram Brodard, dated 18 May 2026. 2 pages, complete. It is signed by the line manager.", "NDA_reminder_ack_Brodard_20260319.pdf. A non-disclosure reminder acknowledgement for Vikram Brodard, dated 19 March 2026. It is a single page and is signed by the departing employee.", "Equipment_return_receipt_Brodard_20260522.pdf. An equipment return receipt for Vikram Brodard, dated 22 May 2026. It is a single page and is signed by the receiving IT asset officer.", "Line_manager_confirmation_Brodard_date_not_legible.pdf. A line manager confirmation for Vikram Brodard. The date of issue is covered by an ink stamp and cannot be read. It is a single page and is signed by the line manager.", "Payroll_cut_off_note_Brodard_20260523.pdf. A final payroll cut-off note for Vikram Brodard, dated 23 May 2026. It is a single page and is signed by the payroll officer.", "Leaver_notification_form_Brodard_20260410.pdf. A leaver notification form for Vikram Brodard, dated 10 April 2026. 2 pages, complete. It is signed by the line manager.", "Access_rights_inventory_Brodard_20260509.pdf. An access rights inventory for Vikram Brodard, dated 9 May 2026. 4 pages, complete.", "Service_desk_closure_summary_Brodard_20260517.pdf. A service desk ticket closure summary for Vikram Brodard, dated 17 May 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "The question to answer is whether the pack stands complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-63", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1031}} {"id": "isc-te-00149-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Xanheim GmbH", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "7 May 2026"}, "checklist": ["Pension contribution certificate, issued within the last 13 months", "Rental income record", "Employment income summary, issued within the last 13 months", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Bank interest statement, issued within the last 13 months"], "submission": {"case": {"name": "household tax affairs WG-34056", "reference": "EP-63392", "details": ["The household sold a property other than its main home during the tax year."]}, "cover note": "Could you please approve this pack as quickly as possible? All the paperwork is in order.", "documents received": ["Employment income summary.pdf - Employment income summary for household tax affairs WG-34056. Its date of issue is 18 August 2025. 2 pages, complete.", "Capital gains asset record.pdf - Capital gains asset record for household tax affairs WG-34056. Its date of issue is 8 February 2026. 2 pages, complete.", "Bank interest statement.pdf - Bank interest statement for household tax affairs WG-34056. Its date of issue is 30 April 2025. 3 pages, complete.", "Childcare payment receipt.pdf - Childcare payment receipt for household tax affairs WG-34056. Its date of issue is 13 March 2026. 1 page.", "Pension contribution certificate.pdf - Pension contribution certificate for household tax affairs WG-34056. Its date of issue is 21 June 2025. 2 pages, complete.", "Rental income record.pdf - Rental income record for household tax affairs WG-34056. Its date of issue is 27 January 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 833}} {"id": "isc-te-00291-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Aldwick Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "14 July 2026"}, "checklist": ["Check for the thermostat calibration certificate, issued within the last 12 months.", "Check for the plant room access sign-in sheet.", "Check for the refrigerant top-up log, issued within the last 1 months and signed.", "Check for the asset condition photograph sheet, issued within the last 1 months.", "Check for the engineer's service report, issued within the last 1 months and signed.", "If the system contains more than 5 tonnes of refrigerant, also check for the fixed leak detection test certificate, issued within the last 6 months and signed."], "submission": {"case": {"name": "air conditioning system SL-89503", "reference": "NG-66391", "details": ["The system contains more than 5 tonnes of refrigerant."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["Plant room access sign-in sheet SL-89503.pdf: A single-page plant room access sign-in sheet for air conditioning system SL-89503, dated 25 June 2026.", "Engineer's service report SL-89503.pdf: An engineer's service report for air conditioning system SL-89503, dated 25 June 2026; 3 pages, complete, signed by the service engineer.", "Thermostat calibration certificate SL-89503.pdf: A single-page thermostat calibration certificate for air conditioning system SL-89503, dated 4 November 2025.", "Old refrigerant log 2025 SL-89503.pdf: A single-page old refrigerant log from a previous year for air conditioning system SL-89503, dated 25 June 2026, signed by the site technician.", "System pressure test results SL-89503.pdf: System pressure test results for air conditioning system SL-89503, dated 8 July 2026; 2 pages, complete, signed by the service engineer.", "Refrigerant top-up log SL-89503.pdf: A single-page refrigerant top-up log for air conditioning system SL-89503, dated 25 June 2026, signed by the service engineer.", "Asset condition photograph sheet SL-89503.pdf: An asset condition photograph sheet for air conditioning system SL-89503, dated 30 June 2026; 2 pages, complete.", "Fixed leak detection test certificate SL-89503.pdf: A fixed leak detection test certificate for air conditioning system SL-89503, dated 16 February 2026; 2 pages, complete, signed by the leak detection engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1028}} {"id": "isc-te-00004-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Arvhaven Inc", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "26 June 2026"}, "checklist": ["Risk assessment, issued within the last 3 months and signed", "Business justification memo, issued within the last 3 months and signed", "Proposed rule change specification, signed", "Firewall change request form, signed", "If the change opens a new inbound connection from the internet, also: internet exposure review certificate, issued within the last 1 months and signed"], "submission": {"case": {"name": "firewall change XI-19991", "reference": "SY-92295", "details": ["The change opens a new inbound connection from the internet."]}, "documents received": ["Risk assessment for firewall change XI-19991, dated 20 April 2026, 2 pages, complete. Signed by the network security lead.", "Business justification memo for firewall change XI-19991, dated 10 June 2026, single page. Signed by the requesting business owner.", "Firewall change request form for firewall change XI-19991, dated 1 June 2026, 3 pages, complete. Signed by the requesting business owner.", "Peer review checklist for firewall change XI-19991, dated 19 June 2026, single page. Signed by the reviewing network engineer.", "Proposed rule change specification for firewall change XI-19991, dated 18 April 2026, 2 pages, complete. Signed by the network engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 737}} {"id": "isc-te-00020-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Belmburg GmbH", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "3 March 2026"}, "checklist": ["Lifting equipment inspection report, issued within the last 6 months and signed", "Parking bay suspension approval, issued within the last 1 months and signed", "New floor snagging list, issued within the last 1 months and signed", "Signed move plan", "IT decommissioning certificate, issued within the last 1 months and signed"], "submission": {"case": {"name": "office move project AZ-40366", "reference": "NC-30638"}, "documents received": ["Signed move plan for office move project AZ-40366. Date of issue: 25 February 2026. 6 pages, complete. Signed by the project manager.", "IT decommissioning certificate for office move project AZ-40366. Date of issue: 14 February 2026. 1 page. Signed by the IT manager.", "Parking bay suspension approval for office move project AZ-40366. Date of issue: 25 February 2026. 1 page. Signed by the traffic management officer.", "Crate hire agreement for office move project AZ-40366. Date of issue: 10 February 2026. 2 pages, complete. Signed by the crate hire supplier's representative.", "New floor snagging list for office move project AZ-40366. Date of issue: 21 February 2026. 3 pages, complete. Signed by the site manager.", "Lifting equipment inspection report for office move project AZ-40366. Date of issue: 27 November 2025. 2 pages, complete. Signed by the lifting equipment inspector."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00374-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Iskgate Limited", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "19 August 2026"}, "checklist": ["Mortgage application form, signed.", "Proof of deposit, issued within the last 3 months.", "If the property is being bought from a family member, also: independent purchase price assessment, issued within the last 3 months, signed.", "Property valuation report, issued within the last 6 months, signed.", "Credit bureau report, issued within the last 1 months.", "Employment certificate, issued within the last 1 months, signed.", "Sale and purchase agreement, signed."], "submission": {"case": {"name": "property HJ-44730", "reference": "BV-35753", "details": ["The property is being bought from a family member."]}, "documents received": ["Mortgage application form - property HJ-44730.pdf. Mortgage application form for property HJ-44730, dated 30 July 2026. 6 pages, complete. Signed by the applicant.", "Sale and purchase agreement - property HJ-44730.pdf. Sale and purchase agreement for property HJ-44730, dated 27 July 2026. 9 pages, complete. Signed by the purchasers.", "Credit bureau report - property HJ-44730.pdf. Credit bureau report for property HJ-44730, dated 30 July 2026. 4 pages, complete.", "Employment certificate - property HJ-44730.pdf. Employment certificate for property HJ-44730, dated 14 August 2026. Single page. Signed by the employer.", "Property valuation report - property HJ-44730.pdf. Property valuation report for property HJ-44730, dated 4 July 2026. 10 pages, complete. Signed by the valuer.", "Proof of deposit - property HJ-44730.pdf. Proof of deposit for property HJ-44730, dated 10 July 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 870}} {"id": "isc-te-00258-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Orrgard Limited", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "20 April 2026"}, "checklist": ["Data protection impact assessment, issued within the last 12 months and signed.", "Merchant account agreement, signed.", "Test environment transaction log, issued within the last 1 months.", "Penetration test summary, issued within the last 6 months and signed.", "Go-live sign-off certificate, issued within the last 1 months and signed.", "Fraud screening configuration sheet, signed."], "submission": {"case": {"name": "payment gateway KK-52797", "reference": "ZJ-99275"}, "documents received": ["Go-live sign-off certificate for payment gateway KK-52797, dated 12 April 2026. Single page. Signed by the Head of Payments.", "Merchant account agreement for payment gateway KK-52797, dated 28 December 2025. 6 pages, complete. Signed by the Payments Director.", "Penetration test summary for payment gateway KK-52797, dated 17 November 2025. 3 pages, complete. Signed by the penetration tester.", "Test environment transaction log for payment gateway KK-52797, dated 12 April 2026. Pages 1 to 1 are included and the total number of pages is not shown anywhere.", "Fraud screening configuration sheet for payment gateway KK-52797, dated 4 January 2026. Single page. Signed by the Fraud Prevention Lead.", "Data protection impact assessment for payment gateway KK-52797, dated 6 January 2026. 5 pages, complete. Signed by the Data Protection Officer."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 587}} {"id": "isc-te-00361-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Zervcrest Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "11 August 2026"}, "checklist": ["Confirm the pack contains the proposed rule change specification, signed.", "Confirm the pack contains the risk assessment, issued within the last 3 months, signed.", "Confirm the pack contains the business justification memo, issued within the last 3 months, signed.", "Confirm the pack contains the firewall change request form, signed.", "If the change is planned during the year-end close period, also: confirm the pack contains the freeze period exception approval, signed.", "If the change opens a new inbound connection from the internet, also: confirm the pack contains the internet exposure review certificate, issued within the last 1 months, signed."], "submission": {"case": {"name": "firewall change WU-46525", "reference": "PN-13005", "details": ["The change is planned for a normal working week.", "The change only affects internal connections between servers."]}, "documents received": ["Proposed rule change specification, firewall change WU-46525. Date of issue: 4 May 2026. 2 pages, complete. Signed by the network security architect.", "Project charter for an unrelated initiative, filed with the pack for firewall change WU-46525. Date of issue: 17 July 2026. Single page. Signed by the project sponsor.", "Firewall change request form, firewall change WU-46525. Date of issue: 26 May 2026. 3 pages, complete. Signed by the requesting network engineer.", "Current rule set export, firewall change WU-46525. Date of issue: 9 August 2026. 8 pages, complete.", "Business justification memo, firewall change WU-46525. Date of issue: 17 July 2026. Single page. Signed by the requesting business line manager.", "Risk assessment, firewall change WU-46525. Date of issue: 14 July 2026. 2 pages, complete. Signed by the information security risk analyst."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 867}} {"id": "isc-te-00074-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Jordale plc", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "12 March 2026"}, "checklist": ["If the equipment is above the major purchase threshold, also include: tender waiver justification (signed)", "Equipment purchase request form (signed)", "Installation requirements note", "Cost-benefit justification", "Training needs assessment (signed)", "Grant fund eligibility note (signed, issued within the last 6 months)"], "submission": {"case": {"name": "equipment EZ-12088", "reference": "RL-72447", "details": ["The equipment is above the major purchase threshold."]}, "documents received": ["Grant fund eligibility note for equipment EZ-12088, dated 9 February 2026. 1 page. Signed by the Research Funding Officer.", "Equipment purchase request form for equipment EZ-12088, dated 12 November 2025. 2 pages, complete. Signed by the requesting Department Head.", "Cost-benefit justification for equipment EZ-12088, dated 23 December 2025. 3 pages, complete.", "Installation requirements note for equipment EZ-12088, dated 8 February 2026. 2 pages, complete.", "Training needs assessment for equipment EZ-12088, dated 13 November 2025. 1 page. Signed by the Training Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 700}} {"id": "isc-te-00148-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Lombheim Ltd", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "1 June 2026"}, "checklist": ["Capital gains asset record", "Gift aid donation summary", "Rental income record", "Childcare payment receipt issued within the last 13 months", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Tax return draft printout, signed"], "submission": {"case": {"name": "household tax affairs ND-78453", "reference": "UP-21658", "details": ["The household sold a property other than its main home during the tax year."]}, "documents received": ["Capital gains asset record for household tax affairs ND-78453, dated 9 May 2026. 2 pages, complete.", "Rental income record for household tax affairs ND-78453, dated 5 May 2026. 4 pages, complete.", "Gift aid donation summary for household tax affairs ND-78453, dated 20 May 2026. Single page.", "Childcare payment receipt for household tax affairs ND-78453, dated 14 May 2026. Single page.", "Tax return draft printout for household tax affairs ND-78453, dated 2 February 2026. 6 pages, complete. Signed by the household's tax filer.", "File scan_001: the scan is blank, so its contents cannot be seen.", "Property disposal calculation sheet for household tax affairs ND-78453, dated 7 February 2026. 2 pages, complete. Signed by the household's tax filer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? That is the question to answer. Work through all checklist lines that bear on this case. For a required document to be counted, it must be the kind of document listed on the checklist (a similar document will not suffice), it must be about the case's subject, it must have all its pages present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued inside the period the checklist allows. A conditional line applies only when the circumstance it sets out holds for the case. complete: every applicable line is met, and extra documents are irrelevant. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one line cannot be decided from what is shown, for example when a needed date, signature or page count is not visible, when a document's kind cannot be told, or when the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-54", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00339-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Pellwood Ltd", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "4 May 2026"}, "checklist": ["Medical examination certificate, issued within the last 6 months and signed.", "Right to work share code printout, issued within the last 3 months.", "Licence application form, signed.", "If the applicant has lived at an address outside the country in the last five years, also: criminal record certificate from overseas, issued within the last 3 months.", "Photo driving licence, valid (not expired) on the date of the review.", "Passport style photograph, issued within the last 6 months."], "submission": {"case": {"name": "Manon Pimingham", "reference": "YV-79327"}, "documents received": ["Licence application form for Manon Pimingham. Dated 11 January 2026. 6 pages, complete. Signed by the applicant.", "Photo driving licence for Manon Pimingham. Expiry date 1 July 2027. 2 pages, complete.", "Medical examination certificate for Manon Pimingham. Dated 15 December 2025. 2 pages, complete. Signed by the examining doctor.", "Passport style photograph for Manon Pimingham. Dated 9 December 2025. Single page.", "Driver declaration of convictions for Manon Pimingham. Dated 29 January 2026. Single page. Signed by the driver.", "Right to work share code printout for Manon Pimingham. Dated 30 April 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 741}} {"id": "isc-te-00052-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Yarvham GmbH", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "7 May 2026"}, "checklist": ["Naming convention approval, signed", "Account purpose statement", "Platform terms acceptance record, signed", "Two-factor authentication confirmation issued within the last 3 months", "If the account will be run by an external agency, also: agency access agreement, signed", "If the account will post content about financial products, also: financial promotions approval note, signed and issued within the last 3 months", "Account request form, signed", "Content escalation route, signed"], "submission": {"case": {"name": "new social media account AR-54483", "reference": "HK-37859", "details": ["The account will be run entirely by in-house staff.", "The account will post content about financial products."]}, "documents received": ["Account request form AR-54483.pdf. This is a single-page account request form for new social media account AR-54483, dated 21 February 2026, and it is signed by the requesting marketing manager.", "Financial promotions approval note AR-54483.pdf. This is a financial promotions approval note for new social media account AR-54483, dated 24 April 2026. It is 2 pages, complete, and it is signed by the financial promotions approver.", "Platform terms acceptance record AR-54483.pdf. This is a single-page platform terms acceptance record for new social media account AR-54483, dated 26 February 2026, and it is signed by the social media governance lead.", "Two-factor authentication confirmation AR-54483 31 October 2025.pdf. This is a single-page two-factor authentication confirmation for new social media account AR-54483, dated 31 October 2025.", "Content escalation route AR-54483.pdf. This is a single-page content escalation route for new social media account AR-54483, dated 13 April 2026, and it is signed by the social media governance lead.", "Admin access list AR-54483.pdf. This is a single-page admin access list for new social media account AR-54483, dated 4 May 2026.", "Naming convention approval AR-54483.pdf. This is a single-page naming convention approval for new social media account AR-54483, dated 27 April 2026, and it is signed by the social media governance lead.", "Account purpose statement AR-54483.pdf. This is a single-page account purpose statement for new social media account AR-54483, dated 28 January 2026."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and determine completeness. Check each checklist line that applies to this case. A required document counts only if it matches the listed document kind (not something similar), deals with the subject of the case, has all pages intact, is signed wherever the checklist calls for a signature, had not expired by the review date, and was issued within the timeframe the checklist permits. A conditional line is applicable only if its circumstance holds for the case. complete: all applicable lines are met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, yet at least one cannot be resolved from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead you; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-8", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1011}} {"id": "isc-te-00188-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Fennfell Group", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "3 August 2026"}, "checklist": ["Travel advance request form, signed", "Line manager approval for the advance, signed", "Costed trip estimate sheet issued within the last 3 months, signed", "Outstanding advance clearance check, signed", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Daniel Aldwick", "reference": "RL-87051"}, "documents received": ["Payroll Deduction Agreement for Recovery of the Advance. The agreement relates to Daniel Aldwick and is dated 19 June 2026. It is a single page and is signed by the travelling employee.", "Travel Advance Request Form. The form relates to Daniel Aldwick and is dated 30 May 2026. It is a single page and is signed by the travelling employee.", "Line Manager Approval for the Advance. The approval relates to Daniel Aldwick and is dated 4 May 2026. It is a single page and is signed by the line manager.", "Outstanding Advance Clearance Check. The check relates to Daniel Aldwick and is dated 30 May 2026. It is a single page and is signed by the accounts payable reviewer.", "Costed Trip Estimate Sheet. The sheet relates to Daniel Aldwick and is dated 23 June 2026. It is a single page and is signed by the travelling employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 707}} {"id": "isc-te-00267-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Yselcombe LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "6 July 2026"}, "checklist": ["Insurance excess waiver certificate, valid (not expired) on the date of the review.", "Passport, valid (not expired) on the date of the review, and signed.", "Fuel policy sheet, signed.", "Additional driver authorisation form, signed.", "Vehicle condition report, signed.", "Booking voucher, issued within the last 6 months.", "If the booking includes crossing a land border, also: cross-border travel permission, signed."], "submission": {"case": {"name": "Thomas Yellworth", "reference": "KU-46488", "details": ["The booking stays within one country."]}, "documents received": ["Additional driver authorisation form for Thomas Yellworth. It shows a date of issue of 26 June 2026 and is signed by the hirer, Thomas Yellworth. It is 1 page.", "Vehicle condition report for Thomas Yellworth. It shows a date of issue of 18 May 2026 and is signed by the counter agent. It is 2 pages, complete.", "Fuel policy sheet for Thomas Yellworth. It shows a date of issue of 24 May 2026 and is signed by the hirer, Thomas Yellworth. It is 1 page.", "Driving licence for Thomas Yellworth. It shows an expiry date of 22 September 2028 and is signed by the holder, Thomas Yellworth. It is 2 pages, complete.", "Passport for Thomas Yellworth. It shows an expiry date of 25 July 2026 and is signed by the bearer, Thomas Yellworth. It is 1 page.", "Booking voucher for Thomas Yellworth. It shows a date of issue of 7 June 2026. It is 1 page.", "Credit card in the driver's name, Thomas Yellworth. It shows an expiry date of 22 October 2027 and is signed on the reverse by the cardholder, Thomas Yellworth. It is 1 page.", "Insurance excess waiver certificate for Thomas Yellworth. It shows an expiry date of 4 May 2027. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 887}} {"id": "isc-te-00474-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Belmdale Partners", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "4 May 2026"}, "checklist": ["New floor snagging list, issued within the last 1 months and signed", "Movers insurance certificate, valid (not expired) on the date of the review", "Crate hire agreement, signed", "IT decommissioning certificate, issued within the last 1 months and signed", "If the move includes taking furniture to a storage unit, also: storage unit access authorisation, signed", "Signed move plan", "Furniture inventory list, issued within the last 1 months and signed"], "submission": {"case": {"name": "office move project ID-94583", "reference": "DM-22219", "details": ["The move includes taking furniture to a storage unit."]}, "documents received": ["IT decommissioning certificate ID-94583.pdf — IT decommissioning certificate for office move project ID-94583, dated 29 April 2026. Single page. Signed by the IT manager.", "Furniture inventory list ID-94583.pdf — Furniture inventory list for office move project ID-94583, dated 29 April 2026. 4 pages, complete. Signed by the facilities manager.", "New floor snagging list ID-94583.pdf — New floor snagging list for office move project ID-94583, dated 17 April 2026. 3 pages, complete. Signed by the site manager.", "Storage unit access authorisation ID-94583.pdf — Storage unit access authorisation for office move project ID-94583, dated 15 March 2026. Single page. Signed by the storage site manager.", "Movers insurance certificate ID-94583.pdf — Movers insurance certificate for office move project ID-94583. Shows an expiry date of 8 April 2027. Single page.", "Move plan ID-94583.pdf — Signed move plan for office move project ID-94583, dated 17 February 2026. 6 pages, complete. Signed by the move project manager.", "Crate hire agreement ID-94583.pdf — Crate hire agreement for office move project ID-94583, dated 7 February 2026. 2 pages, complete. Signed by the crate hire supplier."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 935}} {"id": "isc-te-00189-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ovarfield GmbH", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "17 June 2026"}, "checklist": ["Costed trip estimate sheet, issued within the last 3 months and signed.", "Travel advance request form, signed.", "Employee bank detail confirmation, issued within the last 6 months and signed.", "Travel policy extract showing advance eligibility.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Trip itinerary and approval, issued within the last 3 months and signed."], "submission": {"case": {"name": "Mert Bramstad", "reference": "VR-72958", "details": ["The requested advance is within the standard advance limit."]}, "cover note": "Apologies that this pack was put together in a rush. Please let me know if you need anything else from me.", "documents received": ["VR-72958_d2_travel_advance_request_form.pdf. A single-page travel advance request form for Mert Bramstad, dated 21 March 2026. It is signed by the employee.", "VR-72958_d1_costed_trip_estimate_sheet.pdf. A single-page costed trip estimate sheet for Mert Bramstad, dated 28 April 2026. It is signed by the employee's line manager.", "VR-72958_d5_trip_itinerary_and_approval.pdf. A trip itinerary and approval for Mert Bramstad, dated 8 April 2026, 2 pages, complete. It is signed by the approving manager.", "VR-72958_d3_employee_bank_detail_confirmation.pdf. A single-page employee bank detail confirmation for Mert Bramstad, dated 29 May 2026. It is signed by the payroll administrator.", "VR-72958_d4_travel_policy_extract.pdf. A single-page travel policy extract showing advance eligibility for Mert Bramstad, dated 28 May 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 817}} {"id": "isc-te-00417-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Vaskhall Group", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "10 September 2026"}, "checklist": ["Confirm the pack contains proof of deposit savings issued within the last 3 months.", "Confirm the pack contains a property valuation report issued within the last 3 months and signed.", "Confirm the pack contains the three most recent payslips issued within the last 3 months.", "Confirm the pack contains three months of bank statements issued within the last 3 months."], "submission": {"case": {"name": "Simon Foskani", "reference": "JA-60691"}, "cover note": "I am not sure that everything needed is in this pack.", "documents received": ["JA-60691_property-valuation-report-4_Foskani.pdf - Property valuation report for Simon Foskani, dated 19 June 2026, by the valuer. 8 pages, complete.", "JA-60691_property-valuation-report-5_Foskani.pdf - Property valuation report for Simon Foskani, dated 15 November 2025, signed by the valuer. 8 pages, complete.", "JA-60691_proof-of-deposit-savings_Foskani.pdf - Proof of deposit savings for Simon Foskani, dated 7 September 2026. 2 pages, complete.", "JA-60691_bank-statements_Foskani.pdf - Three months of bank statements for Simon Foskani, dated 25 July 2026. 9 pages, complete.", "JA-60691_payslips_Foskani.pdf - Three most recent payslips for Simon Foskani, dated 31 July 2026. 3 pages, complete.", "JA-60691_passport_Foskani.pdf - Passport for Simon Foskani, expiry date 5 December 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 816}} {"id": "isc-te-00054-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Hondhurst Inc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "11 March 2026"}, "checklist": ["Flammability test certificate, issued within the last 12 months", "Kit contents list", "Kit cost breakdown, issued within the last 3 months and signed", "If the kit includes an electrical display unit, also: electrical safety test certificate, issued within the last 12 months", "Brand colour specification", "Shipping manifest, issued within the last 1 months", "Waste disposal plan"], "submission": {"case": {"name": "merchandising kit XM-57664", "reference": "OC-82346", "details": ["The kit includes no electrical display unit."]}, "cover note": "Please find attached the pack for merchandising kit XM-57664. I am not sure everything needed is there. — Emily Quillescu", "documents received": ["XM-57664 flammability test certificate.pdf — A flammability test certificate for merchandising kit XM-57664, dated 23 October 2025. It is a single page.", "XM-57664 store installation guide.pdf — A store installation guide for merchandising kit XM-57664, dated 6 December 2025. 6 pages, complete.", "XM-57664 shipping manifest.pdf — A shipping manifest for merchandising kit XM-57664, dated 7 March 2026. 2 pages, complete.", "XM-57664 waste disposal plan.pdf — A waste disposal plan for merchandising kit XM-57664, dated 23 January 2026. It is a single page.", "XM-57664 kit contents list.pdf — A kit contents list for merchandising kit XM-57664, dated 16 November 2025. 2 pages, complete.", "XM-57664 brand colour specification.pdf — A brand colour specification for merchandising kit XM-57664, dated 14 December 2025. It is a single page.", "XM-57664 kit cost breakdown.pdf — A kit cost breakdown for merchandising kit XM-57664, dated 2 February 2026. 2 pages, complete. It is signed by the finance manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 931}} {"id": "isc-te-00428-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Jundwyn BV", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "10 March 2026"}, "checklist": ["Benefit claim form, valid (not expired) on the date of the review, signed", "Proof of national insurance number", "If the claimant has a non-dependant adult living in the household, also: non-dependant income details form, signed", "Current tenancy agreement, signed", "Recent bank statements, issued within the last 2 months"], "submission": {"case": {"name": "Alice Ostock", "reference": "MD-67214", "details": ["The claimant has a non-dependant adult living in the household."]}, "documents received": ["non-dependant-income_ostock.pdf. Non-dependant income details form about Alice Ostock, issued 3 February 2026. 2 pages, complete. Signed by the non-dependant.", "bank-statements_ostock.pdf. Recent bank statements about Alice Ostock, issued 20 January 2026. 12 pages, complete.", "tenancy-agreement_ostock.pdf. Current tenancy agreement about Alice Ostock, issued 31 December 2025. 12 pages, complete. Signed by the landlord.", "earnings-proof_ostock.pdf. Proof of earnings about Alice Ostock, issued 28 February 2026. 2 pages, complete.", "claim-form_ostock_v4.pdf. Benefit claim form about Alice Ostock, expiring 10 February 2027. Pages 1 to 1 are included; the total number of pages is not shown anywhere. Signed by the claimant.", "ni-proof_ostock.pdf. Proof of national insurance number about Alice Ostock, issued 3 January 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 782}} {"id": "isc-te-00245-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Silvik Ltd", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "1 April 2026"}, "checklist": ["Support plan, signed.", "Safeguarding referral form, issued within the last 12 months, signed.", "Benefit entitlement letters, issued within the last 12 months.", "Recent bank statements, issued within the last 3 months.", "Capacity assessment record, signed."], "submission": {"case": {"name": "Anna Holtard", "reference": "TU-70173"}, "documents received": ["Recent bank statements. Recent bank statements for Anna Holtard, dated 27 January 2026. 8 pages, complete.", "Safeguarding referral form. A safeguarding referral form for Anna Holtard, dated 29 September 2025. 2 pages, complete. Signed by the safeguarding officer.", "Capacity assessment record. A capacity assessment record for Anna Holtard, dated 7 March 2026. 4 pages, complete. Signed by the approved mental capacity assessor.", "Financial assessment form. A financial assessment form for Anna Holtard, dated 31 January 2026. 6 pages, complete. Signed by the financial assessment officer.", "Support plan. A support plan for Anna Holtard, dated 21 December 2025. 6 pages, complete. Signed by the lead social worker.", "Benefit entitlement letters. Benefit entitlement letters for Anna Holtard, dated 17 July 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 728}} {"id": "isc-te-00120-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Morvholm Group", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "3 March 2026"}, "checklist": ["Obtain the equipment breakdown claim form, signed.", "Obtain the photographs of the failed component.", "Obtain the machine maintenance log, issued within the last 6 months.", "Obtain the repair or replacement quotation, issued within the last 3 months.", "Obtain the purchase invoice for the machine.", "Obtain the production downtime log, issued within the last 3 months and signed."], "submission": {"case": {"name": "failed machine WJ-98667", "reference": "SK-93016"}, "cover note": "This pack was already checked by a colleague before I sent it over. Michael Daskden", "documents received": ["equipment_breakdown_claim_form_WJ-98667.pdf — Equipment breakdown claim form for failed machine WJ-98667, dated 4 November 2025. It is signed by the policyholder's claims representative. 3 pages, complete.", "repair_replacement_quotation_WJ-98667.pdf — Repair or replacement quotation for failed machine WJ-98667, dated 17 December 2025. 2 pages, complete.", "photographs_failed_component_WJ-98667.pdf — Photographs of the failed component for failed machine WJ-98667, dated 5 November 2025. 2 pages, complete.", "policy_machinery_schedule_WJ-98667.pdf — Policy machinery schedule for failed machine WJ-98667, dated 25 January 2026. 3 pages, complete.", "production_downtime_log_WJ-98667.pdf — Production downtime log for failed machine WJ-98667, dated 8 January 2026. It is signed by the production manager. 2 pages, complete.", "purchase_invoice_machine_WJ-98667.pdf — Purchase invoice for the machine, covering failed machine WJ-98667, dated 11 November 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "You must judge if the pack is complete relative to the checklist. Review each line of the checklist that has relevance to this case. To count, a required document must match the kind of document the checklist specifies (a similar one will not do), must relate to the subject of the case, must include all its pages, must be signed wherever the checklist calls for a signature, must still be valid on the review date (that is, not expired), and must have been issued during the period the checklist permits. A conditional line binds the case only if the circumstance it describes actually holds. complete: all applicable lines are satisfied, and extra documents are of no consequence. incomplete: at least one applicable line fails. unclear: no line fails outright, but at least one cannot be decided on the basis of what is displayed, for example a necessary date, signature or page count is not visible, the kind of a document cannot be told, or the case details are silent on whether a conditional line's circumstance holds while that line's document is missing. Do not rely on cover notes or labels, which may mislead; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-52", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 901}} {"id": "isc-te-00199-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silridge Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "18 March 2026"}, "checklist": ["Delegate photo identification that is valid, meaning not expired, on the date of the review.", "Cancellation policy acceptance, signed.", "Special requirements note.", "Employer sponsorship letter issued within the last 3 months, signed.", "Venue access instructions issued within the last 3 months.", "If the course leads to a licensed qualification, also: licence eligibility declaration, signed.", "Prerequisite certificate."], "submission": {"case": {"name": "course booking PG-59381", "reference": "XR-38194", "details": ["The course does not lead to a licensed qualification."]}, "cover note": "I am not sure everything needed is in the pack, so please check it carefully before confirming the place.", "documents received": ["Prerequisite certificate, course booking PG-59381. Issued 16 December 2025. 1 page.", "Cancellation policy acceptance, course booking PG-59381. Issued 7 February 2026. Signed by the delegate. 1 page.", "Venue access instructions, course booking PG-59381. Issued 13 February 2026. 1 page.", "Special requirements note, course booking PG-59381. Issued 26 January 2026. 1 page.", "Delegate photo identification, course booking PG-59381. The identification expires on 28 November 2026. 1 page.", "Employer sponsorship letter, course booking PG-59381. Issued 7 March 2026. Signed by the employer's authorised signatory. 1 page."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Go through all checklist lines that apply to this case. To count, a required document must be the kind of document listed rather than a similar one, must be about the subject of the case, must have all its pages, must be signed wherever the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-62", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 792}} {"id": "isc-te-00048-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lombmore Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "7 September 2026"}, "checklist": ["Audit finding sheets (signed)", "Management review minutes (signed)", "If the audit found a major non-conformity, also: major non-conformity corrective action plan (signed)", "Audit attendance sheet (signed)", "Previous audit follow-up record (issued within the last 24 months, signed)"], "submission": {"case": {"name": "internal audit IG-1902", "reference": "OH-77753", "details": ["The audit found a major non-conformity."]}, "documents received": ["Audit checklist for each area visited for internal audit IG-1902, dated 26 June 2026. 4 pages, complete. Signed by the lead auditor.", "Audit attendance sheet for internal audit IG-1902, dated 21 June 2026. Single page. Signed by the lead auditor.", "Previous audit follow-up record for internal audit IG-1902, dated 25 January 2025. 2 pages, complete. Signed by the quality manager.", "Management review minutes for internal audit IG-1902, dated 25 May 2026. 4 pages, complete. Signed by the quality manager.", "Major non-conformity corrective action plan for internal audit IG-1902, dated 14 June 2026. 3 pages, complete. Signed by the quality manager.", "Audit finding sheets for internal audit IG-1902, dated 17 June 2026. 2 pages, complete. The part of the page where a signature would be is covered by a sticky note, so it is not known whether it is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 785}} {"id": "isc-te-00150-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jarlmouth LLP", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "17 June 2026"}, "checklist": ["If the supplier is a foreign company, also: certified translation of the certificate of incorporation (signed)", "Certificate of incorporation", "Supplier declaration of no conflicts of interest (signed)", "Bank details confirmation letter (issued within the last 3 months, signed)", "Supplier registration form (signed)"], "submission": {"case": {"name": "Xanhall Inc", "reference": "EC-70750", "details": ["The supplier is a domestic company."]}, "documents received": ["Supplier declaration of no conflicts of interest for Xanhall Inc, dated 18 May 2026. Single page, signed by a company director.", "Signed copy of the general terms and conditions for Xanhall Inc, dated 29 May 2026. 6 pages, complete, signed by an authorised company representative.", "Bank details confirmation letter for Xanhall Inc, issued 5 May 2026. Single page, signed by a bank officer.", "Certificate of incorporation for Xanhall Inc, issued 19 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 650}} {"id": "isc-te-00254-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Elvwater BV", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 June 2026"}, "checklist": ["Annual activity report, issued within the last 6 months, signed.", "If the institute received industry funding above the university's disclosure threshold, also: industry funding disclosure statement, issued within the last 12 months, signed.", "Staffing plan, issued within the last 6 months, signed.", "Financial expenditure summary, issued within the last 3 months, signed.", "Doctoral researcher progress summary, issued within the last 6 months, signed.", "Intellectual property register extract, issued within the last 6 months, signed.", "Director's declaration of interests, issued within the last 12 months, signed."], "submission": {"case": {"name": "Wendmere Inc", "reference": "GI-71566"}, "documents received": ["Wendmere Inc doctoral researcher progress summary.pdf - A doctoral researcher progress summary for Wendmere Inc, dated 22 January 2026. It has 2 pages, complete, and is signed by the doctoral programme coordinator.", "Wendmere Inc annual activity report.pdf - An annual activity report for Wendmere Inc, dated 2 April 2026. It has 12 pages, complete, and is signed by the institute director.", "Wendmere Inc external advisory board minutes.pdf - Minutes of the external advisory board for Wendmere Inc, dated 10 February 2026. They have 4 pages, complete, and are signed by the board secretary.", "Wendmere Inc director's declaration of interests.pdf - A director's declaration of interests for Wendmere Inc, dated 28 February 2026. It is a single page and is signed by the institute director.", "Wendmere Inc intellectual property register extract.pdf - An intellectual property register extract for Wendmere Inc, dated 11 February 2026. It is a single page and is signed by the head of technology transfer.", "Wendmere Inc financial expenditure summary.pdf - A financial expenditure summary for Wendmere Inc, dated 16 April 2026. It has 3 pages, complete, and is signed by the institute finance officer.", "Wendmere Inc staffing plan.pdf - A staffing plan for Wendmere Inc, dated 3 April 2026. It has 2 pages, complete, and is signed by the institute director.", "Wendmere Inc industry funding disclosure statement.pdf - An industry funding disclosure statement for Wendmere Inc, dated 21 May 2026. It is a single page and is signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 956}} {"id": "isc-te-00174-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Gravwell Ltd", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "24 August 2026"}, "checklist": ["Marketing screenshot pack", "Device compatibility matrix, issued within the last 3 months", "Localisation completeness report, issued within the last 1 months", "Store listing description, issued within the last 1 months", "Privacy policy update, issued within the last 3 months", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months, signed", "Crash-free rate report, issued within the last 1 months"], "submission": {"case": {"name": "mobile app release TG-70212", "reference": "OE-37898", "details": ["The mobile app release includes third-party analytics."]}, "documents received": ["localisation_completeness_report_TG-70212.pdf - Localisation completeness report for mobile app release TG-70212. Date of issue: 21 August 2026. 2 pages, complete.", "crash_free_rate_report_TG-70212.pdf - Crash-free rate report for mobile app release TG-70212. Date of issue: 22 August 2026. Single page.", "store_listing_description_TG-70212.pdf - Store listing description for mobile app release TG-70212. Date of issue: 5 August 2026. Single page.", "marketing_screenshot_pack_TG-70212.pdf - Marketing screenshot pack for mobile app release TG-70212. Date of issue: 8 July 2026. 6 pages, complete.", "release_notes_TG-70212.pdf - Release notes for mobile app release TG-70212. Date of issue: 11 August 2026. 2 pages, complete.", "device_compatibility_matrix_TG-70212.pdf - Device compatibility matrix for mobile app release TG-70212. Date of issue: 21 August 2026. 2 pages, complete.", "privacy_policy_update_TG-70212.pdf - Privacy policy update for mobile app release TG-70212. Date of issue: 15 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 916}} {"id": "isc-te-00455-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Prydwood Inc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "28 July 2026"}, "checklist": ["Check that there is an outstanding advance clearance check, signed.", "Check that there is a travel advance request form, signed.", "Check that there is an employee bank detail confirmation, issued within the last 6 months and signed.", "Check that there is a travel policy extract showing advance eligibility."], "submission": {"case": {"name": "Lotte Mabaker", "reference": "WY-52421"}, "documents received": ["Travel advance request form for Lotte Mabaker, dated 15 May 2026. Single page, signed by the travelling employee.", "Travel policy extract showing advance eligibility for Lotte Mabaker, dated 8 June 2026. Single page.", "Outstanding advance clearance check for Lotte Mabaker, dated 3 May 2026. Single page, signed by the accounts payable supervisor.", "Employee bank detail confirmation for Lotte Mabaker, dated 17 July 2026. Single page, signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 631}} {"id": "isc-te-00300-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jorheim Inc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "29 June 2026"}, "checklist": ["Photographs of the spillage on the floor, issued within the last 1 months.", "Witness statement from a staff member, signed.", "Staff training record for the duty manager, issued within the last 24 months and signed.", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed.", "CCTV footage stills of the incident, issued within the last 3 months.", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed.", "Public liability insurance schedule."], "submission": {"case": {"name": "Dravfeld SAS", "reference": "WO-22645", "details": ["The injured customer did not go to hospital.", "The customer is handling the claim personally."]}, "documents received": ["CCTV footage stills of the incident - Dravfeld SAS.pdf. The stills from the CCTV footage of the incident at Dravfeld SAS show a date of issue of 19 June 2026. 2 pages, complete.", "Photographs of the spillage on the floor - Dravfeld SAS.pdf. The photographs show the spillage on the floor at Dravfeld SAS, with a date of issue of 18 June 2026. 1 page.", "Witness statement from a staff member - Dravfeld SAS.pdf. The statement from a staff member at Dravfeld SAS is dated 4 April 2026 and is 1 page. It is signed by the staff witness.", "Public liability insurance schedule - Dravfeld SAS.pdf. The schedule for Dravfeld SAS shows a date of issue of 23 April 2026. 4 pages, complete.", "Incident report from the day - Dravfeld SAS.pdf. The report on the incident on the day at Dravfeld SAS is dated 16 May 2026 and is signed by the duty manager. 2 pages, complete.", "Staff training record for the duty manager - Dravfeld SAS.pdf. The record for the duty manager at Dravfeld SAS is dated 30 September 2025 and is signed by the duty manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 911}} {"id": "isc-te-00364-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Corvfeld plc", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "8 July 2026"}, "checklist": ["Data migration confirmation, issued within the last 3 months, signed.", "Dependent systems check report, issued within the last 3 months.", "Asset register update, issued within the last 1 month.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed.", "Licence reassignment note, issued within the last 3 months, signed.", "Data wipe certificate, issued within the last 3 months, signed.", "Decommission request form, signed."], "submission": {"case": {"name": "retired server IS-34675", "reference": "HO-82305"}, "documents received": ["Data migration confirmation for retired server IS-34675, dated 27 May 2026. 2 pages, complete. Signed by the operations lead.", "Decommission request form for retired server IS-34675, dated 17 March 2026. 2 pages, complete. Signed by the requesting team manager.", "Network disconnection confirmation for retired server IS-34675, dated 30 June 2026. Single page. Signed by the network engineer who performed the disconnection.", "Licence reassignment note for retired server IS-34675, dated 4 May 2026. Single page. Signed by the operations lead.", "Dependent systems check report for retired server IS-34675, dated 2 July 2026. 3 pages, complete.", "Data wipe certificate for retired server IS-34675, dated 26 May 2026. Single page. Signed by the engineer who carried out the wipe.", "Asset register update for retired server IS-34675, dated 2 July 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete when measured against the checklist. Go over every checklist line relevant to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, contain all its pages, carry a signature wherever the checklist asks for one, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': all applicable lines are met (extra documents do not matter). 'incomplete': at least one applicable line is unmet. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-45", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00023-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Aldvik Limited", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "17 August 2026"}, "checklist": ["Engineer F-gas handling certificate, valid (not expired) on the date of the review.", "Engineer's service report, issued within the last 1 months, signed.", "Asset condition photograph sheet, issued within the last 1 months.", "Plant room access sign-in sheet.", "F-gas leak check record, issued within the last 12 months, signed.", "System pressure test results, issued within the last 1 months, signed."], "submission": {"case": {"name": "air conditioning system TH-31121", "reference": "TH-69673"}, "documents received": ["Engineer's service report for air conditioning system TH-31121, issued on 6 August 2026. 3 pages, complete. Signed by the service engineer.", "System pressure test results for air conditioning system TH-31121, issued on 1 August 2026. 2 pages, complete. Signed by the test engineer.", "Asset condition photograph sheet for air conditioning system TH-31121, issued on 3 August 2026. 2 pages, complete.", "F-gas leak check record for air conditioning system TH-31121, issued on 10 November 2025. 2 pages, complete. Signed by the attending engineer.", "Plant room access sign-in sheet for air conditioning system TH-31121, issued on 31 July 2026. Single page.", "Engineer F-gas handling certificate for air conditioning system TH-31121, showing an expiry date of 13 March 2027. Single page."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 595}} {"id": "isc-te-00289-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Neskheim Ltd", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "2 June 2026"}, "checklist": ["Check that the course booking form is signed.", "Check that a prerequisite certificate is included.", "Check that the employer sponsorship letter was issued within the last 3 months and is signed.", "If the delegate requires an adjusted learning plan, also check that a learning support agreement is included and is signed.", "Check that a special requirements note is included.", "Check that the payment confirmation was issued within the last 3 months."], "submission": {"case": {"name": "course booking GA-88404", "reference": "DT-54396"}, "documents received": ["Payment confirmation GA-88404.pdf. The confirmation is dated 29 March 2026 and refers to course booking GA-88404. Single page.", "Prerequisite certificate GA-88404.pdf. The certificate is dated 21 February 2026 and relates to course booking GA-88404. Single page.", "Employer sponsorship letter GA-88404.pdf. The letter is dated 11 May 2026 and concerns course booking GA-88404. Single page, signed by the employer's HR manager.", "Venue access instructions GA-88404.pdf. The instructions are dated 25 May 2026 and relate to course booking GA-88404. Single page.", "Special requirements note GA-88404.pdf. The note is dated 13 February 2026 and concerns course booking GA-88404. Single page.", "Course booking form GA-88404.pdf. The form is dated 27 April 2026 and covers course booking GA-88404. 2 pages, complete, and signed by the delegate.", "Cancellation policy acceptance GA-88404.pdf. The acceptance is dated 15 May 2026 and concerns course booking GA-88404. Single page, signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 851}} {"id": "isc-te-00470-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Stervberg Ltd", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "9 March 2026"}, "checklist": ["Location details sheet", "Cost estimate issued within the last 3 months, signed", "Job request form, signed", "Parts order confirmation issued within the last 1 months", "Access authorisation slip, signed"], "submission": {"case": {"name": "maintenance request YF-33794", "reference": "GP-45887"}, "documents received": ["Access authorisation slip for maintenance request YF-33794, dated 16 February 2026. 1 page. Signed by the site security officer.", "Cost estimate for maintenance request YF-33794, dated 7 February 2026. 2 pages, complete. Signed by the estimating supervisor.", "Job request form for maintenance request YF-33794, dated 16 February 2026. 1 page. Signed by the requesting manager.", "Risk assessment for the task under maintenance request YF-33794, dated 21 January 2026. 5 pages, complete. Signed by the assessing officer.", "Location details sheet for maintenance request YF-33794, dated 23 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 683}} {"id": "isc-te-00217-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Wendwater BV", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "6 May 2026"}, "checklist": ["Losses calculation statement, issued within the last 1 month and signed", "Litigation hold notice, issued within the last 1 month and signed", "Original service agreement copy", "Termination notice draft, signed", "Breach evidence log, issued within the last 1 month and signed", "Cure period expiry calculation, issued within the last 1 month and signed"], "submission": {"case": {"name": "Yselmoor Partners", "reference": "PS-88626"}, "documents received": ["original_service_agreement_copy_yselmoor.pdf - Original service agreement copy concerning Yselmoor Partners, dated 18 January 2026. 10 pages, complete.", "default_notice_yselmoor.pdf - Default notice previously served concerning Yselmoor Partners, dated 3 December 2025. 1 page. Signed by the Commercial Contracts Manager.", "termination_clause_legal_opinion_yselmoor.pdf - Termination clause legal opinion concerning Yselmoor Partners, dated 24 April 2026. 5 pages, complete. Signed by external counsel.", "termination_notice_draft_yselmoor.pdf - Termination notice draft concerning Yselmoor Partners, dated 30 January 2026. 2 pages, complete. Signed by the Commercial Contracts Manager.", "breach_evidence_log_yselmoor.pdf - Breach evidence log concerning Yselmoor Partners, dated 29 April 2026. 6 pages, complete. Signed by the Head of Contract Management.", "litigation_hold_notice_yselmoor.pdf - Litigation hold notice concerning Yselmoor Partners, dated 16 April 2026. 2 pages, complete. Signed by the General Counsel.", "cure_period_expiry_calculation_12_april_2026.pdf - Cure period expiry calculation concerning Yselmoor Partners, dated 12 April 2026. 2 pages, complete. Signed by the Contract Administrator.", "losses_calculation_statement_yselmoor.pdf - Losses calculation statement concerning Yselmoor Partners, dated 23 April 2026. 3 pages, complete. Signed by the Chief Financial Officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00027-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Nordlock BV", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "29 June 2026"}, "checklist": ["Check the line manager opinion note: it must have been issued within the last 2 months and be signed.", "Check the impact assessment on the team: it must be signed.", "Check the previous flexible working requests record: it must have been issued within the last 24 months.", "Check the current working pattern statement: it must have been issued within the last 3 months.", "Check the flexible working request form: it must be signed.", "Check the client or service impact statement: it must be signed."], "submission": {"case": {"name": "Folake Nebbski", "reference": "EQ-64109"}, "documents received": ["Flexible working request form about Folake Nebbski. It shows its date of issue as 14 June 2026, and it is signed by Folake Nebbski. 3 pages, complete.", "Previous flexible working requests record about Folake Nebbski. It shows its date of issue as 15 July 2024. It is 1 page.", "Impact assessment on the team about Folake Nebbski. It shows its date of issue as 29 May 2026, and it is signed by the line manager. 3 pages, complete.", "Line manager opinion note about Folake Nebbski. It shows its date of issue as 2 June 2026, and it is signed by the line manager. 2 pages, complete.", "Current working pattern statement about Folake Nebbski. It shows its date of issue as 2 May 2026. It is 1 page.", "Previous flexible working requests record about Folake Nebbski. It shows its date of issue as 27 April 2023. It is 1 page.", "Client or service impact statement about Folake Nebbski. It shows its date of issue as 7 April 2026, and it is signed by the line manager. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00030-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Orrburg Limited", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "12 June 2026"}, "checklist": ["Utility supplier's letter confirming the supply was cut off (issued within the last 12 months)", "Drying contractor's certificate of completion (issued within the last 6 months, signed)", "Flood claim form (signed)", "Only if this applies: 'The flood water reached the upper floor of the property': upper floor damage schedule (signed)", "Photographs of flood water in the rooms (issued within the last 1 months)"], "submission": {"case": {"name": "property AU-50577", "reference": "EO-64610", "details": ["The flood water stayed at ground floor level."]}, "documents received": ["AU-50577_drying_contractors_certificate_of_completion.pdf. Drying contractor's certificate of completion for property AU-50577, dated 11 January 2026. 2 pages, complete. Signed by the drying contractor.", "AU-50577_photographs_of_flood_water_in_the_rooms.pdf. Photographs of flood water in the rooms of property AU-50577, dated 10 June 2026. 3 pages, complete.", "AU-50577_debris_removal_invoice.pdf. Debris removal invoice for property AU-50577, dated 4 June 2026. 1 page.", "AU-50577_flood_claim_form.pdf. Flood claim form for property AU-50577, dated 7 March 2026. 5 pages, complete. Signed by the policyholder.", "AU-50577_utility_suppliers_letter.pdf. Utility supplier's letter confirming the supply was cut off for property AU-50577, dated 21 August 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 815}} {"id": "isc-te-00255-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Yselmoor Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "28 August 2026"}, "checklist": ["Customer contact details sheet (signed)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Loyalty scheme enrolment form (signed)", "Marketing consent form (signed)", "Initial points balance statement (issued within the last 3 months)", "Identity verification document (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Camille Rookett", "reference": "EV-96904", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Loyalty scheme enrolment form for Camille Rookett. It is dated 9 May 2026 and is a single page. It is signed by the member, Camille Rookett.", "Marketing consent form for Camille Rookett. It is dated 30 April 2026 and is a single page. It is signed by the member, Camille Rookett.", "Initial points balance statement for Camille Rookett. It is dated 17 July 2026 and is a single page. It shows the member's starting points balance.", "Terms and conditions acceptance sheet for Camille Rookett. It is dated 27 June 2026 and is a single page. It is signed by the member, Camille Rookett.", "Identity verification document for Camille Rookett. It is a single page. It shows an expiry date of 21 December 2028.", "Customer contact details sheet for Camille Rookett. It is dated 30 April 2026 and is a single page. It is signed by the member, Camille Rookett."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist. Go through every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete if every applicable line is met (extra documents do not matter). Choose incomplete if at least one applicable line is not met. Choose unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-30", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 814}} {"id": "isc-te-00185-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Merslock & Co", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "25 March 2026"}, "checklist": ["Fixed asset register extract for the asset", "Sales invoice or receipt for the sale proceeds, issued within the last 3 months", "If the asset is being sold rather than scrapped, also: proof of payment received from the buyer, issued within the last 3 months", "Asset disposal request form, signed", "Written offer or valuation for the asset, issued within the last 6 months", "If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer, issued within the last 3 months", "Depreciation schedule for the asset to date", "Asset de-registration and tag removal record, signed"], "submission": {"case": {"name": "disposed asset JI-91007", "reference": "ER-48676", "details": ["The asset is being sold rather than scrapped.", "The asset is not a company car being part-exchanged."]}, "documents received": ["Asset_de-registration_and_tag_removal_record_JI-91007.pdf: An asset de-registration and tag removal record relating to disposed asset JI-91007, dated 6 February 2026. It is a single page and is signed by the group financial controller.", "Depreciation_schedule_JI-91007.pdf: A depreciation schedule for the asset to date relating to disposed asset JI-91007, dated 17 March 2026. All 2 of its 2 pages are included, 2 pages, complete.", "Asset_disposal_request_form_JI-91007.pdf: An asset disposal request form relating to disposed asset JI-91007, dated 6 December 2025. All 2 of its 2 pages are included, 2 pages, complete. It is signed by the group financial controller.", "Proof_of_payment_received_from_buyer_JI-91007.pdf: A proof of payment received from the buyer relating to disposed asset JI-91007. It is dated 2 March 2026 and is a single page.", "Written_offer_or_valuation_JI-91007.pdf: A written offer or valuation for the asset relating to disposed asset JI-91007, dated 2 January 2026. All 2 of its 2 pages are included, 2 pages, complete.", "Fixed_asset_register_extract_JI-91007.pdf: A fixed asset register extract for the asset relating to disposed asset JI-91007. It is dated 9 January 2026 and is a single page.", "Profit_or_loss_on_disposal_calculation_JI-91007.pdf: A profit or loss on disposal calculation relating to disposed asset JI-91007, dated 12 January 2026. It is a single page and is signed by the group financial controller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1053}} {"id": "isc-te-00023-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Aldvik Limited", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "17 August 2026"}, "checklist": ["Engineer F-gas handling certificate, valid (not expired) on the date of the review.", "Engineer's service report, issued within the last 1 months, signed.", "Asset condition photograph sheet, issued within the last 1 months.", "Plant room access sign-in sheet.", "F-gas leak check record, issued within the last 12 months, signed.", "System pressure test results, issued within the last 1 months, signed."], "submission": {"case": {"name": "air conditioning system TH-31121", "reference": "TH-69673"}, "documents received": ["Asset condition photograph sheet for air conditioning system TH-31121, issued on 3 August 2026. 2 pages, complete.", "Plant room access sign-in sheet for air conditioning system TH-31121, issued on 31 July 2026. Single page.", "System pressure test results for air conditioning system TH-31121, issued on 1 August 2026. Pages 1 to 2 are included, with the total number of pages not shown anywhere on the document. Signed by the test engineer.", "Engineer F-gas handling certificate for air conditioning system TH-31121, showing an expiry date of 13 March 2027. Single page.", "Engineer's service report for air conditioning system TH-31121, issued on 6 August 2026. 3 pages, complete. Signed by the service engineer.", "Thermostat calibration certificate for air conditioning system TH-31121, issued on 15 August 2026. Single page.", "F-gas leak check record for air conditioning system TH-31121, issued on 10 November 2025. 2 pages, complete. Signed by the attending engineer."]}}, "question": {"type": "choice", "instructions": "Does the pack satisfy the checklist? Work through each checklist line relevant to this case. A required document counts only if it matches the kind of document listed (not a similar one), concerns the subject of the case, contains all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-32", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 830}} {"id": "isc-te-00136-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Tondside Partners", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "12 May 2026"}, "checklist": ["Previous audit follow-up record, issued within the last 24 months, signed.", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list, signed.", "Audit finding sheets, signed.", "Audit interview notes, signed.", "Management review minutes, signed.", "Audit checklist for each area visited, signed.", "Internal audit plan, issued within the last 12 months, signed."], "submission": {"case": {"name": "internal audit MX-72526", "reference": "LS-20464", "details": ["The audit did not cover the calibration laboratory."]}, "documents received": ["Audit checklist for each area visited - MX-72526.pdf. The checklists relate to internal audit MX-72526 and are dated 2 April 2026. They run to 4 pages, complete, and are signed by the auditor for each area.", "Internal audit plan - MX-72526.pdf. The plan covers internal audit MX-72526 and is dated 14 August 2025. It runs to 2 pages, complete, and is signed by the quality manager.", "Management review minutes - MX-72526.pdf. The minutes concern internal audit MX-72526 and are dated 20 February 2026. They run to 4 pages, complete, and are signed by the chair of the review board.", "Audit interview notes - MX-72526.pdf. The notes were taken during internal audit MX-72526 and are dated 10 February 2026. They run to 3 pages, complete, and are signed by the auditor who conducted the interviews.", "Job interview record for a new hire - MX-72526.pdf. The record relates to a job interview for a new hire connected with internal audit MX-72526 and is dated 10 February 2026. It runs to 3 pages, complete, and is signed by the hiring supervisor.", "Audit finding sheets - MX-72526.pdf. The sheets cover internal audit MX-72526 and show a date of issue of 22 January 2026. They run to 2 pages, complete, and are signed by the lead auditor.", "Audit summary report - MX-72526.pdf. The report summarises internal audit MX-72526 and is dated 23 April 2026. It runs to 5 pages, complete, and is signed by the lead auditor.", "Previous audit follow-up record - MX-72526.pdf. The record relates to internal audit MX-72526 and is dated 23 September 2025. It runs to 2 pages, complete, and is signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1040}} {"id": "isc-te-00283-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Weskwood GmbH", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "29 May 2026"}, "checklist": ["Proof of deposit issued within the last 3 months", "Employment certificate issued within the last 1 month and signed", "Property valuation report issued within the last 6 months and signed", "Photo identity document valid (not expired) on the date of the review", "Bank statement issued within the last 3 months", "Mortgage application form, signed"], "submission": {"case": {"name": "property XP-89411", "reference": "BB-98566"}, "documents received": ["proof_of_deposit_XP-89411.pdf. A proof of deposit for property XP-89411, dated 10 April 2026. It is a single page.", "photo_identity_document_XP-89411.pdf. A photo identity document for property XP-89411 showing an expiry date of 14 November 2027. It is a single page.", "mortgage_application_form_XP-89411.pdf. A mortgage application form for property XP-89411, dated 31 March 2026. It has 6 pages, complete, and is signed by the applicant.", "property_valuation_report_XP-89411.pdf. A property valuation report for property XP-89411, dated 19 March 2026. It has 10 pages, complete, and is signed by the valuer.", "employment_certificate_XP-89411_v2.pdf. An employment certificate for property XP-89411, dated 27 May 2026. It is a single page and its signature line is empty.", "bank_statement_XP-89411.pdf. A bank statement for property XP-89411, dated 30 March 2026. It has 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00319-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Oskford BV", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "17 September 2026"}, "checklist": ["Supplier self-assessment report, issued within the last 12 months and signed.", "Certified quality management system certificate, valid (not expired) on the date of the review.", "Financial stability statement, issued within the last 12 months and signed.", "Raw material certificate of analysis, issued within the last 6 months and signed.", "If the supplier provides parts that are safety-critical, also: process failure mode and effects analysis, signed.", "Supplier audit report, issued within the last 24 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed."], "submission": {"case": {"name": "Elstfeld SAS", "reference": "QD-20096"}, "documents received": ["Financial stability statement for Elstfeld SAS. Date of issue: 6 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Process failure mode and effects analysis for Elstfeld SAS. Date of issue: 21 August 2026. 9 pages, complete. Signed by the supplier's process engineer.", "Raw material certificate of analysis for Elstfeld SAS. Date of issue: 6 July 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Supplier audit report for Elstfeld SAS. Date of issue: 6 January 2025. 8 pages, complete. Signed by the lead auditor.", "Supplier capacity declaration for Elstfeld SAS. Date of issue: 14 August 2026. 2 pages, complete. Signed by the supplier's operations manager.", "Certified quality management system certificate for Elstfeld SAS. Expiry date: 8 March 2028. Single page.", "Supplier self-assessment report for Elstfeld SAS. Date of issue: 14 May 2026. 6 pages, complete. Signed by the supplier's quality manager.", "Supplier quality questionnaire for Elstfeld SAS. Date of issue: 29 January 2026. 4 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 874}} {"id": "isc-te-00388-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Wilmford Inc", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "3 September 2026"}, "checklist": ["Meeting invitation with rights explained — issued within the last 1 month", "Written grievance statement — signed", "Evidence bundle index — signed", "Adjustment request record — issued within the last 3 months and signed"], "submission": {"case": {"name": "Sophie Orvaker", "reference": "RG-91668"}, "documents received": ["RG-91668_written_grievance_statement_signed.pdf — Written grievance statement concerning Sophie Orvaker, dated 29 August 2026. 3 pages, complete. Signed by Sophie Orvaker.", "RG-91668_evidence_bundle_index.pdf — Evidence bundle index concerning Sophie Orvaker, dated 25 June 2026. 2 pages, complete. Signed by the employee relations team lead.", "RG-91668_meeting_invitation_rights_explained.pdf — Meeting invitation with rights explained concerning Sophie Orvaker, dated 23 August 2026. 1 page.", "RG-91668_grievance_procedure_acknowledgement.pdf — Grievance procedure acknowledgement concerning Sophie Orvaker, dated 30 June 2026. 1 page. Signed by the HR case handler.", "RG-91668_previous_grievance_outcome_letter.pdf — Previous grievance outcome letter concerning Sophie Orvaker, dated 26 January 2026. 2 pages, complete.", "RG-91668_adjustment_request_record.pdf — Adjustment request record concerning Sophie Orvaker, dated 26 July 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 780}} {"id": "isc-te-00194-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Tarvston Limited", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "16 September 2026"}, "checklist": ["Signature verification record: confirm it is present and signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form: confirm it is present and signed", "Photo identification: confirm it is valid (not expired) on the date of the review", "Delivery address confirmation: confirm it is present and signed", "Card replacement request form: confirm it is present and signed", "Fraud questionnaire: confirm it is present and signed", "Account statement showing recent activity: confirm it was issued within the last 1 months"], "submission": {"case": {"name": "Daan Jessova", "reference": "KM-50187", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["contact_details_confirmation.pdf - Confirmation of contact details for Daan Jessova, dated 12 September 2026. 1 page.", "signature_verification_record.pdf - Signature verification record for Daan Jessova, dated 18 August 2026. 1 page. Signed by a card services officer.", "account_statement_recent_activity.pdf - Account statement showing recent activity for Daan Jessova, dated 1 September 2026. 3 pages, complete.", "fraud_questionnaire.pdf - Card replacement fraud questionnaire for Daan Jessova, dated 10 August 2026. 2 pages, complete. Signed by the cardholder.", "card_replacement_request_form.pdf - Card replacement request form for Daan Jessova, dated 11 July 2026. 2 pages, complete. Signed by the cardholder.", "delivery_address_confirmation.pdf - Delivery address confirmation for Daan Jessova, dated 8 June 2026. 1 page. Signed by the cardholder.", "photo_identification.pdf - Photo identification for Daan Jessova, showing an expiry date of 25 April 2028. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 831}} {"id": "isc-te-00025-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Dravside Group", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "16 September 2026"}, "checklist": ["Previous grievance outcome letter, issued within the last 24 months.", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed.", "Witness list, signed.", "Evidence bundle index, signed.", "Investigator appointment letter, issued within the last 3 months."], "submission": {"case": {"name": "Carmen Daskow", "reference": "VR-41263", "details": ["The grievance is not against the employee's direct manager."]}, "documents received": ["VR-41263 investigator appointment letter - Carmen Daskow.pdf. Investigator appointment letter about Carmen Daskow, dated 12 July 2026. A single page.", "VR-41263 previous grievance outcome letter - Carmen Daskow.pdf. Previous grievance outcome letter about Carmen Daskow, dated 16 January 2025. 2 pages, complete.", "VR-41263 witness list - Carmen Daskow.pdf. Witness list about Carmen Daskow, dated 3 July 2026. A single page, signed by the case handler.", "VR-41263 evidence bundle index - Carmen Daskow.pdf. Evidence bundle index about Carmen Daskow, dated 3 September 2026. 2 pages, complete, signed by the case handler."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide. Go through each checklist line that applies to this case. Only count a required document if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-64", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 723}} {"id": "isc-te-00013-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Bravston Partners", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "18 September 2026"}, "checklist": ["Shareholder register extract, issued within the last 3 months.", "Proof of registered office address, issued within the last 3 months.", "If the company operates in a cash-intensive trade, also: cash handling policy, signed.", "Board resolution to open the account, signed.", "Company tax registration certificate.", "Company statutes, signed."], "submission": {"case": {"name": "Weskberg BV", "reference": "CW-58097", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["Cash handling policy - Weskberg BV.pdf — Cash handling policy for Weskberg BV, dated 2 July 2026. 2 pages, complete. It carries the signature of the managing director.", "Shareholder register extract - Weskberg BV.pdf — Shareholder register extract for Weskberg BV, dated 17 August 2026. 2 pages, complete.", "Board resolution to open the account - Weskberg BV.pdf — Board resolution to open the account for Weskberg BV, dated 28 May 2026. 1 page. It is signed by the members of the board.", "Company tax registration certificate - Weskberg BV.pdf — Company tax registration certificate for Weskberg BV, dated 4 August 2026. 1 page.", "Company statutes - Weskberg BV.pdf — Company statutes for Weskberg BV, dated 4 August 2026. 12 pages, complete. It is signed by the managing director.", "Proof of registered office address - Weskberg BV.pdf — Proof of registered office address for Weskberg BV, dated 25 July 2026. 1 page.", "Beneficial owner identification form - Weskberg BV.pdf — Beneficial owner identification form for Weskberg BV, dated 28 August 2026. 3 pages, complete. It is signed by a representative of the company."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack satisfies the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-66", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00219-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Jaskton Partners", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "19 August 2026"}, "checklist": ["Operator licence: valid (not expired) on the date of the review.", "Franchise application form: signed.", "Fit-out cost estimate: issued within the last 6 months, signed.", "Pilot operation audit report: issued within the last 6 months, signed.", "If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement, valid (not expired) on the date of the review, signed.", "Funding agreement from a lender: issued within the last 3 months, signed."], "submission": {"case": {"name": "Lombness Inc", "reference": "VN-40580", "details": ["The franchise territory includes premises in a shopping centre."]}, "cover note": "Please find attached everything needed for reference VN-40580, all complete.", "documents received": ["pilot_operation_audit_report_VN-40580.pdf - Pilot operation audit report for Lombness Inc. It shows a date of issue of 2 August 2026 and is signed by the pilot operation auditor. 8 pages, complete.", "fit_out_cost_estimate_VN-40580.pdf - Fit-out cost estimate for Lombness Inc. It shows a date of issue of 14 May 2026 and is signed by the fit-out contractor. 4 pages, complete.", "franchise_application_form_VN-40580.pdf - Franchise application form for Lombness Inc. It shows a date of issue of 25 July 2026 and is signed by the franchisee applicant. 3 pages, complete.", "franchise_agreement_counterpart_VN-40580.pdf - Signed franchise agreement counterpart for Lombness Inc. It shows a date of issue of 24 June 2026 and is signed by the franchisor's authorised signatory. 12 pages, complete.", "operator_licence_VN-40580.pdf - Operator licence for Lombness Inc. It shows an expiry date of 27 July 2027. 2 pages, complete.", "funding_agreement_VN-40580.pdf - Funding agreement from a lender for Lombness Inc. It shows a date of issue of 25 July 2026 and is signed by the lender. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 923}} {"id": "isc-te-00439-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Boltfeld plc", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "4 August 2026"}, "checklist": ["Merchant account agreement, signed.", "Data protection impact assessment, issued within the last 12 months, signed.", "Fraud screening configuration sheet, signed.", "If the gateway will handle recurring subscription payments, also: subscription billing mandate template, signed.", "Gateway integration request form, signed.", "Test environment transaction log, issued within the last 1 months.", "Penetration test summary, issued within the last 6 months, signed."], "submission": {"case": {"name": "payment gateway DN-3787", "reference": "YB-55164"}, "cover note": "Please find attached everything needed for the payment gateway DN-3787 review, all complete. Happy to answer any questions before sign-off. Ava Mundby.", "documents received": ["Go-live sign-off certificate for payment gateway DN-3787. Dated 1 August 2026. Single page. Signed by the head of payments and IT security.", "Merchant account agreement for payment gateway DN-3787. Dated 11 June 2026. 6 pages, complete. Signed by the merchant account holder.", "Gateway integration request form for payment gateway DN-3787. Dated 4 June 2026. 2 pages, complete. Signed by the requesting manager.", "Test environment transaction log for payment gateway DN-3787. Dated 20 July 2026. 4 pages, complete.", "Data protection impact assessment for payment gateway DN-3787. Dated 14 September 2025. 5 pages, complete. Signed by the data protection officer.", "Fraud screening configuration sheet for payment gateway DN-3787. Dated 27 April 2026. Single page. Signed by the fraud screening lead.", "Penetration test summary for payment gateway DN-3787. Dated 19 February 2026. 3 pages, complete. Signed by the penetration tester."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 852}} {"id": "isc-te-00148-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Lombheim Ltd", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "1 June 2026"}, "checklist": ["Capital gains asset record", "Gift aid donation summary", "Rental income record", "Childcare payment receipt issued within the last 13 months", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Tax return draft printout, signed"], "submission": {"case": {"name": "household tax affairs ND-78453", "reference": "UP-21658", "details": ["The household sold a property other than its main home during the tax year."]}, "cover note": "This pack has already been checked by a colleague. Please let me know if anything further is needed from my side.", "documents received": ["Property disposal calculation sheet for household tax affairs ND-78453, dated 7 February 2026. 2 pages, complete. Signed by the household's tax filer.", "Rental income record for household tax affairs ND-78453, dated 5 May 2026. 4 pages, complete.", "Childcare payment receipt for household tax affairs ND-78453, dated 14 May 2026. Single page.", "Bank interest statement for household tax affairs ND-78453, dated 13 July 2025. 3 pages, complete.", "Capital gains asset record for household tax affairs ND-78453, dated 9 May 2026. Pages 1 to 2 are included; the total number of pages is not shown anywhere.", "Tax return draft printout for household tax affairs ND-78453, dated 2 February 2026. 6 pages, complete. Signed by the household's tax filer.", "Gift aid donation summary for household tax affairs ND-78453, dated 20 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Output complete if every applicable line is met (extra documents do not matter). Output incomplete if at least one applicable line is not met. Output unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so base your judgement on the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-31", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 843}} {"id": "isc-te-00223-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Jundbury Limited", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "14 August 2026"}, "checklist": ["Confirm that the pack contains a transfer completion confirmation issued within the last 1 months, signed.", "Confirm that the pack contains an outbound loading record issued within the last 1 months, signed.", "Confirm that the pack contains an inbound unloading record issued within the last 1 months, signed.", "Confirm that the pack contains a damaged goods exception sheet issued within the last 1 months, signed.", "Confirm that the pack contains a seal number log issued within the last 1 months, signed."], "submission": {"case": {"name": "cross-dock transfer HU-37848", "reference": "TS-97557"}, "documents received": ["outbound_loading_record_HU-37848_10Aug2026.pdf. Outbound loading record for cross-dock transfer HU-37848, dated 10 August 2026. Single page, signed by the outbound loading supervisor.", "inbound_unloading_record_HU-37848_5Aug2026.pdf. Inbound unloading record for cross-dock transfer HU-37848, dated 5 August 2026. Single page, signed by the inbound unloading supervisor.", "transfer_completion_confirmation_HU-37848_6Aug2026.pdf. Transfer completion confirmation for cross-dock transfer HU-37848, dated 6 August 2026. Single page; the bottom of the page is cropped, so the signature block cannot be seen and it is not known whether the document is signed.", "damaged_goods_exception_sheet_HU-37848_25Jul2026.pdf. Damaged goods exception sheet for cross-dock transfer HU-37848, dated 25 July 2026. Single page, signed by the warehouse shift supervisor.", "seal_number_log_HU-37848_12Aug2026.pdf. Seal number log for cross-dock transfer HU-37848, dated 12 August 2026. Single page, signed by the outbound driver.", "transfer_manifest_HU-37848_9Jul2026.pdf. Transfer manifest for cross-dock transfer HU-37848, dated 9 July 2026. 3 pages, complete; signed by the transport planner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 935}} {"id": "isc-te-00143-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Sardbrook Limited", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "17 August 2026"}, "checklist": ["Confirm the pack contains an IT equipment loan form that has been signed.", "Confirm the pack contains a placement learning plan that has been signed.", "Confirm the pack contains a workplace induction checklist that has been issued within the last 1 months and that has been signed.", "Confirm the pack contains an emergency contact form.", "Confirm the pack contains a mentor assignment note that has been signed."], "submission": {"case": {"name": "Lukas Natby", "reference": "WQ-44926"}, "documents received": ["A one-page IT equipment loan form for Lukas Natby, dated 6 May 2026, signed by the IT equipment loans officer.", "A workplace induction checklist for Lukas Natby, dated 1 August 2026; 2 pages, complete. The last page is cropped where the signature would be, so it is not known whether it is signed.", "A confidentiality undertaking for Lukas Natby, dated 24 April 2026; 2 pages, complete, signed by the intern himself.", "A one-page emergency contact form for Lukas Natby, dated 24 June 2026.", "An internship agreement for Lukas Natby, dated 1 June 2026; 4 pages, complete, signed by the internship coordinator.", "A one-page mentor assignment note for Lukas Natby, dated 10 June 2026, signed by the mentoring programme lead.", "A placement learning plan for Lukas Natby, dated 8 July 2026; 2 pages, complete, signed by the placement supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 754}} {"id": "isc-te-00352-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Nordston GmbH", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "4 March 2026"}, "checklist": ["If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter (issued within the last 3 months, signed)", "remediation items list (issued within the last 3 months, signed)", "follow-up owner assignment sheet (issued within the last 3 months, signed)", "root cause analysis report (issued within the last 3 months, signed)", "alerting rules review note (issued within the last 3 months)", "customer impact statement (issued within the last 3 months)", "postmortem meeting minutes (issued within the last 3 months, signed)"], "submission": {"case": {"name": "production incident MC-46081", "reference": "MU-34394", "details": ["The incident was caused by a third-party service outage."]}, "documents received": ["Vendor outage acknowledgement letter for production incident MC-46081, dated 15 February 2026. It is 1 page and is signed by the vendor's service manager.", "Remediation items list for production incident MC-46081, dated 2 March 2026. It is 2 pages, complete, and is signed by the remediation lead.", "Postmortem meeting minutes for production incident MC-46081, dated 7 February 2026. It is 3 pages, complete, and is signed by the meeting chair.", "Alerting rules review note for production incident MC-46081, dated 15 February 2026. It is 2 pages, complete.", "Customer impact statement for production incident MC-46081. The date of issue is smudged and cannot be read. It is 2 pages, complete.", "Follow-up owner assignment sheet for production incident MC-46081, dated 3 January 2026. It is 1 page and is signed by the incident manager.", "Root cause analysis report for production incident MC-46081, dated 7 February 2026. It is 5 pages, complete, and is signed by the lead reliability engineer."]}}, "question": {"type": "choice", "instructions": "You are deciding whether the pack is complete when checked against the checklist. Go through every checklist line that applies to this case. Only if a required document is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows does it count. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves must be judged.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-58", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00371-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ambbrook Limited", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "4 June 2026"}, "checklist": ["Signature verification record, signed", "Lost card declaration, signed", "Fraud questionnaire, signed", "Photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Zeynep Fitzisey", "reference": "OJ-28573"}, "documents received": ["Account statement showing recent activity for Zeynep Fitzisey. Date of issue: 2 June 2026. 3 pages, complete.", "Fraud questionnaire for Zeynep Fitzisey. Date of issue: 14 March 2026. 2 pages, complete. Signed by the cardholder.", "Photo identification for Zeynep Fitzisey. Expiry date: 23 July 2026. 1 page.", "Signature verification record for Zeynep Fitzisey. Date of issue: 4 April 2026. 1 page. Signed by the cardholder.", "Note about a damaged card for Zeynep Fitzisey. Date of issue: 25 May 2026. 1 page. Signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 659}} {"id": "isc-te-00435-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Eskcourt SAS", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "5 March 2026"}, "checklist": ["Confirm the complaint category code sheet is present.", "If the complaint alleges a member of staff behaved rudely, also confirm the staff member written response (signed) is present.", "Confirm the original complaint record is present and was issued within the last 6 months.", "Confirm the policy breach summary is present, was issued within the last 3 months, and is signed.", "Confirm the proposed resolution letter draft is present and is signed.", "Confirm the store incident report is present, was issued within the last 3 months, and is signed.", "Confirm the goodwill gesture approval note is present, was issued within the last 1 months, and is signed."], "submission": {"case": {"name": "escalated complaint AZ-62550", "reference": "RC-36204", "details": ["The complaint alleges a member of staff behaved rudely."]}, "documents received": ["Staff member written response, escalated complaint AZ-62550. Date of issue: 2 February 2026. 1 page. Signed by the staff member.", "Policy breach summary, escalated complaint AZ-62550. Date of issue: 18 February 2026. 2 pages, complete. Signed by the store manager.", "Complaint category code sheet, escalated complaint AZ-62550. Date of issue: 20 February 2026. 1 page.", "Proposed resolution letter draft, escalated complaint AZ-62550. Date of issue: 24 December 2025. 2 pages, complete. Signed by the customer relations manager.", "Goodwill gesture approval note, escalated complaint AZ-62550. Date of issue: 26 February 2026. 1 page. Signed by the head of customer relations.", "Complaint escalation form, escalated complaint AZ-62550. Date of issue: 19 February 2026. 2 pages, complete. Signed by the customer relations team leader.", "Customer contact log, escalated complaint AZ-62550. Date of issue: 14 January 2026. 3 pages, complete.", "Original complaint record, escalated complaint AZ-62550. Date of issue: 22 October 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 924}} {"id": "isc-te-00438-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Halvmont GmbH", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "15 April 2026"}, "checklist": ["If the gateway will handle recurring subscription payments, also: subscription billing mandate template (signed)", "go-live sign-off certificate (issued within the last 1 months, signed)", "If the gateway will store customers' card details, also: card storage compliance certificate (valid (not expired) on the date of the review)", "merchant account agreement (signed)", "data protection impact assessment (issued within the last 12 months, signed)", "fraud screening configuration sheet (signed)"], "submission": {"case": {"name": "payment gateway QZ-24811", "reference": "HL-76895", "details": ["The gateway will not handle recurring subscription payments.", "The gateway will not store customers' card details."]}, "documents received": ["Fraud screening configuration sheet for payment gateway QZ-24811, dated 20 February 2026. Single page, signed by the fraud screening analyst.", "Data protection impact assessment for payment gateway QZ-24811, dated 8 September 2025. Pages 1-4 of 5, signed by the data protection officer.", "Go-live sign-off certificate for payment gateway QZ-24811, dated 28 March 2026. Single page, signed by the IT security lead.", "Merchant account agreement for payment gateway QZ-24811, dated 31 December 2025. 6 pages, complete, signed by the merchant account manager."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Go through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-49", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 751}} {"id": "isc-te-00437-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Faldcourt & Co", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "5 August 2026"}, "checklist": ["Complaint escalation form, issued within the last 1 month and signed", "Proposed resolution letter draft, signed", "Customer contact log, issued within the last 3 months", "Policy breach summary, issued within the last 3 months and signed", "Original complaint record, issued within the last 6 months"], "submission": {"case": {"name": "escalated complaint BO-70275", "reference": "JZ-82529"}, "documents received": ["Complaint escalation form for escalated complaint BO-70275, dated 15 July 2026. 2 pages, complete. Signed by the customer relations team lead.", "Policy breach summary for escalated complaint BO-70275, dated 13 June 2026. 2 pages, complete. Signed by the compliance officer.", "Goodwill gesture approval note for escalated complaint BO-70275, dated 20 July 2026. A single page. Signed by the head of customer relations.", "Original complaint record for escalated complaint BO-70275, dated 7 June 2026. 2 pages, complete.", "Customer contact log for escalated complaint BO-70275. The issue date is covered by a postage stamp. 3 pages, complete.", "Store incident report for escalated complaint BO-70275, dated 17 July 2026. 2 pages, complete. Signed by the store manager.", "Proposed resolution letter draft for escalated complaint BO-70275, dated 25 April 2026. 2 pages, complete. Signed by the customer relations manager."]}}, "question": {"type": "choice", "instructions": "The task is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-51", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 796}} {"id": "isc-te-00313-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Istshaw Partners", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "31 July 2026"}, "checklist": ["Cross-dock slot booking sheet, issued within the last 1 months and signed.", "Inbound unloading record, issued within the last 1 months and signed.", "Seal number log, issued within the last 1 months and signed.", "Transfer completion confirmation, issued within the last 1 months and signed.", "Load consolidation sheet, issued within the last 3 months and signed.", "If the transfer is an international movement, also: transit customs document, signed.", "Outbound loading record, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer TG-84110", "reference": "CV-81739", "details": ["The transfer is an international movement."]}, "cover note": "All the paperwork is in order, so I would appreciate a quick approval. Please let me know as soon as it is confirmed.", "documents received": ["Transfer completion confirmation for cross-dock transfer TG-84110, dated 12 July 2026. Single page. Signed by the transport planner.", "Outbound loading record for cross-dock transfer TG-84110, dated 24 July 2026. Single page. Signed by the outbound loading team leader.", "Seal number log for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the outbound gatekeeper.", "Inbound unloading record for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the inbound unloading supervisor.", "Load consolidation sheet for cross-dock transfer TG-84110, dated 26 July 2026. 2 pages, complete. Signed by the load consolidation coordinator.", "Transit customs document for cross-dock transfer TG-84110, dated 26 June 2026. 4 pages, complete. Signed by the customs agent.", "Cross-dock slot booking sheet for cross-dock transfer TG-84110, dated 21 July 2026. Single page. The signature line is blank, so it is not signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 897}} {"id": "isc-te-00446-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vorncourt Partners", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "11 March 2026"}, "checklist": ["Check that the pack contains a travel insurance quote issued within the last 1 month.", "Check that the pack contains a signed special requests note.", "Check that the pack contains a hotel availability printout issued within the last 1 month and signed.", "If the booking includes a child traveller, also check that the pack contains a child passport copy that is valid (not expired) on the date of the review.", "Check that the pack contains a signed booking request form."], "submission": {"case": {"name": "holiday booking LH-96959", "reference": "HA-14905", "details": ["The booking includes a child traveller."]}, "documents received": ["hotel-availability-printout-LH-96959.pdf — Hotel availability printout for holiday booking LH-96959. Its date of issue is 21 February 2026. 2 pages, complete, signed by the reservations agent.", "customer-feedback-survey-LH-96959.pdf — Customer feedback survey for holiday booking LH-96959. Its date of issue is 2 February 2026. 2 pages, complete, signed by the customer.", "special-requests-note-LH-96959.pdf — Special requests note for holiday booking LH-96959. Its date of issue is 1 February 2026. Single page, signed by the customer.", "child-passport-copy-LH-96959.pdf — Child passport copy for holiday booking LH-96959. Its expiry date is 8 April 2027. Single page.", "travel-insurance-quote-LH-96959.pdf — Travel insurance quote for holiday booking LH-96959. Its date of issue is 3 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 821}} {"id": "isc-te-00443-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Yondfield Group", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "16 April 2026"}, "checklist": ["Problem statement page", "Cost estimate sheet issued within the last 6 months", "Capacity and load estimate issued within the last 6 months", "Alternatives considered table"], "submission": {"case": {"name": "design document ZP-11113", "reference": "XV-29298"}, "documents received": ["Problem statement page for design document ZP-11113, dated 6 March 2026. 2 pages, complete.", "Migration and rollout plan for design document ZP-11113, dated 20 February 2026. 3 pages, complete.", "Alternatives considered table for design document ZP-11113, dated 16 February 2026. Pages 1-1 of 2 are included.", "Capacity and load estimate for design document ZP-11113, dated 19 February 2026. 3 pages, complete.", "Cost estimate sheet for design document ZP-11113, dated 6 March 2026. 2 pages, complete.", "Review board feedback summary for design document ZP-11113, dated 2 March 2026. 2 pages, complete. Signed by the review board chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Examine each checklist line that applies here. A required document counts only if it is the kind of document listed (not a similar one), relates to the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can mislead, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-46", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 706}} {"id": "isc-te-00453-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Tondbrook BV", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "20 July 2026"}, "checklist": ["Signed leaver notification form.", "Signed shared mailbox handover record, issued within the last 1 months.", "Signed final payroll cut-off note, issued within the last 1 months.", "If the leaver held privileged administrator accounts, also: signed privileged account revocation certificate, issued within the last 1 months.", "If the leaver is moving to a competitor, also: signed confidential data removal attestation, issued within the last 1 months.", "Signed non-disclosure reminder acknowledgement."], "submission": {"case": {"name": "Samuel Ingins", "reference": "QD-28899", "details": ["The leaver held no privileged administrator accounts.", "The leaver is moving to a competitor."]}, "documents received": ["shared-mailbox-handover-record-ingins-copy.pdf - Shared mailbox handover record for Samuel Ingins, dated 18 July 2026. Pages 1-1 of 2. Signed by the IT service desk manager.", "confidential-data-removal-attestation-ingins.pdf - Confidential data removal attestation for Samuel Ingins, dated 4 July 2026. Single page. Signed by the information security officer.", "non-disclosure-reminder-acknowledgement-ingins.pdf - Non-disclosure reminder acknowledgement for Samuel Ingins, dated 12 July 2026. Single page. Signed by Samuel Ingins.", "leaver-notification-form-ingins.pdf - Leaver notification form for Samuel Ingins, dated 24 May 2026. 2 pages, complete. Signed by the line manager.", "final-payroll-cut-off-note-ingins.pdf - Final payroll cut-off note for Samuel Ingins, dated 13 July 2026. Single page. Signed by the payroll officer.", "line-manager-confirmation-ingins.pdf - Line manager confirmation for Samuel Ingins, dated 18 July 2026. Single page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 840}} {"id": "isc-te-00287-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Fervburg SAS", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "27 April 2026"}, "checklist": ["Confirm the pack contains the chargeback response form, signed.", "If the goods were delivered to an address different from the billing address, also include the address verification check report, issued within the last 3 months.", "Confirm the pack contains the terms of sale acceptance log, issued within the last 12 months.", "Confirm the pack contains the customer order history extract, issued within the last 6 months.", "Confirm the pack contains the transaction record printout, issued within the last 3 months."], "submission": {"case": {"name": "disputed transaction TL-11034", "reference": "MA-40092", "details": ["The goods were delivered to the billing address."]}, "documents received": ["Chargeback response form for disputed transaction TL-11034, dated 4 April 2026. 2 pages, complete. The form is signed by the payments disputes team lead.", "Terms of sale acceptance log for disputed transaction TL-11034, dated 18 April 2025. Single page.", "Customer order history extract for disputed transaction TL-11034, dated 26 February 2026. 2 pages, complete.", "Transaction record printout for disputed transaction TL-11034, dated 25 April 2026. Single page."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete when every applicable line is met (extra documents do not matter). Return incomplete when at least one applicable line is not met. Return unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-29", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 712}} {"id": "isc-te-00340-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Eskness Limited", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "25 March 2026"}, "checklist": ["Training needs assessment (signed)", "Vendor quotation (issued within the last 3 months)", "Equipment purchase request form (signed)", "Three quotes comparison sheet (issued within the last 3 months, signed)", "Cost-benefit justification"], "submission": {"case": {"name": "equipment NP-85998", "reference": "KG-36968"}, "cover note": "I am sorry that this pack was put together in a rush. Please let me know if anything needs clarifying.", "documents received": ["Vendor quotation - NP-85998.pdf - Vendor quotation for equipment NP-85998, dated 8 February 2026. 2 pages, complete.", "Three quotes comparison sheet - NP-85998.pdf - Three quotes comparison sheet for equipment NP-85998, dated 11 March 2026. 1 page. Signed by the procurement lead.", "Equipment purchase request form - NP-85998.pdf - Equipment purchase request form for equipment NP-85998, dated 19 March 2026. 2 pages, complete. Signed by the requesting department manager.", "Training needs assessment - NP-85998.pdf - Training needs assessment for equipment NP-85998, dated 7 December 2025. 1 page. Signed by the department head.", "Grant fund eligibility note - NP-85998.pdf - Grant fund eligibility note for equipment NP-85998, dated 15 January 2026. 1 page. Signed by the grants officer.", "Cost-benefit justification - NP-85998.pdf - Cost-benefit justification for equipment NP-85998, dated 13 March 2026. 3 pages, complete.", "Maintenance plan - NP-85998.pdf - Maintenance plan for equipment NP-85998, dated 21 December 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 857}} {"id": "isc-te-00213-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Bravhaven Partners", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "6 July 2026"}, "checklist": ["Council flood warning notice, issued within the last 12 months", "Loss adjuster's inspection report, issued within the last 6 months and signed", "Debris removal invoice, issued within the last 6 months", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "Buildings insurance policy schedule"], "submission": {"case": {"name": "property OD-78962", "reference": "ZY-65584"}, "documents received": ["debris_removal_invoice_OD-78962.pdf - Debris removal invoice about property OD-78962. Dated 19 January 2026. 1 page.", "flood_claim_form_OD-78962.pdf - Flood claim form about property OD-78962. Dated 9 April 2026. 5 pages, complete. Signed by the policyholder.", "photographs_of_flood_water_in_the_rooms_OD-78962.pdf - Photographs of flood water in the rooms about property OD-78962. Dated 21 June 2026. 3 pages, complete.", "buildings_insurance_policy_schedule_OD-78962.pdf - Buildings insurance policy schedule about property OD-78962. Dated 10 March 2026. 5 pages, complete.", "utility_suppliers_letter_OD-78962.pdf - Utility supplier's letter confirming the supply was cut off about property OD-78962. Dated 9 September 2025. 1 page.", "council_flood_warning_notice_OD-78962.pdf - Council flood warning notice about property OD-78962. Dated 3 April 2026. 1 page.", "loss_adjusters_inspection_report_OD-78962.pdf - Loss adjuster's inspection report about property OD-78962. Dated 4 April 2026. Pages 1-2 of 6. Signed by the loss adjuster."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 880}} {"id": "isc-te-00163-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Fervbrook Limited", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "13 August 2026"}, "checklist": ["Doctoral researcher progress summary, issued within the last 6 months and signed.", "Financial expenditure summary, issued within the last 3 months and signed.", "If the institute hosts research involving human participants, also: ethics committee annual return, issued within the last 12 months and signed.", "Intellectual property register extract, issued within the last 6 months and signed.", "External advisory board minutes, issued within the last 12 months and signed.", "Annual activity report, issued within the last 6 months and signed.", "Staffing plan, issued within the last 6 months and signed."], "submission": {"case": {"name": "Arvmont Inc", "reference": "QZ-81186", "details": ["The institute hosts research involving human participants."]}, "cover note": "Dear committee members, please find enclosed the pack for review. I am not sure everything needed is there, so please check it carefully. Kind regards, Sarah Nebbsen", "documents received": ["Intellectual property register extract for Arvmont Inc, dated 10 April 2026; 1 page. Signed by the register keeper.", "Publications list for Arvmont Inc, dated 8 October 2025; 4 pages, complete.", "Doctoral researcher progress summary for Arvmont Inc, dated 30 July 2026; 2 pages, complete. Signed by the supervising professor.", "Ethics committee annual return for Arvmont Inc, dated 21 May 2026; 2 pages, complete. Signed by the ethics committee chair.", "Annual activity report for Arvmont Inc, dated 7 May 2026; 12 pages, complete. Signed by the institute director.", "Staffing plan for Arvmont Inc, dated 27 February 2026; 2 pages, complete. Signed by the institute director.", "Financial expenditure summary for Arvmont Inc, dated 29 May 2026; 3 pages, complete. Signed by the institute finance officer.", "External advisory board minutes for Arvmont Inc, dated 3 February 2026; 4 pages, complete. Signed by the board secretary.", "File ref_QZ-81186_scan10.pdf: the file will not open, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Judge the pack against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "variant-36", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 925}} {"id": "isc-te-00075-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Baxton Limited", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 April 2026"}, "checklist": ["Confirm the pack contains the marketing consent form, signed.", "Confirm the pack contains the nominated store preference form, signed.", "Confirm the pack contains the identity verification document, valid and not expired on the date of the review.", "Confirm the pack contains the loyalty scheme enrolment form, signed.", "If the customer is transferring points from a rival scheme, also: confirm the pack contains the points transfer evidence statement, issued within the last 3 months and signed.", "Confirm the pack contains the points transfer request, signed.", "Confirm the pack contains the terms and conditions acceptance sheet, signed."], "submission": {"case": {"name": "Katerina Wraxsall", "reference": "SQ-40557", "details": ["The customer is transferring points from a rival scheme."]}, "documents received": ["Identity verification document - Katerina Wraxsall.pdf. This single-page identity verification document concerning Katerina Wraxsall shows an expiry date of 4 May 2028.", "Points transfer evidence statement - Katerina Wraxsall.pdf. This single-page points transfer evidence statement concerning Katerina Wraxsall is dated 11 February 2026 and carries the signature of the customer.", "Terms and conditions acceptance sheet - Katerina Wraxsall.pdf. This single-page terms and conditions acceptance sheet concerning Katerina Wraxsall is dated 10 March 2026 and carries the signature of the customer.", "Loyalty scheme enrolment form - Katerina Wraxsall.pdf. This single-page loyalty scheme enrolment form concerning Katerina Wraxsall is dated 2 April 2026 and carries the signature of the customer.", "Initial points balance statement - Katerina Wraxsall.pdf. This single-page initial points balance statement concerning Katerina Wraxsall is dated 22 February 2026.", "Customer contact details sheet - Katerina Wraxsall.pdf. This single-page customer contact details sheet concerning Katerina Wraxsall is dated 31 January 2026 and carries the signature of the customer.", "Points transfer request - Katerina Wraxsall.pdf. This single-page points transfer request concerning Katerina Wraxsall is dated 17 January 2026 and carries the signature of the customer.", "Nominated store preference form - Katerina Wraxsall.pdf. This single-page nominated store preference form concerning Katerina Wraxsall is dated 18 March 2026 and carries the signature of the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 974}} {"id": "isc-te-00143-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Sardbrook Limited", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "17 August 2026"}, "checklist": ["Confirm the pack contains an IT equipment loan form that has been signed.", "Confirm the pack contains a placement learning plan that has been signed.", "Confirm the pack contains a workplace induction checklist that has been issued within the last 1 months and that has been signed.", "Confirm the pack contains an emergency contact form.", "Confirm the pack contains a mentor assignment note that has been signed."], "submission": {"case": {"name": "Lukas Natby", "reference": "WQ-44926"}, "cover note": "Please could you approve this pack as soon as you can, as all the paperwork is in order? Many thanks, Larissa Stanski", "documents received": ["A one-page mentor assignment note for Lukas Natby, dated 10 June 2026, signed by the mentoring programme lead.", "A placement learning plan for Lukas Natby, dated 8 July 2026; 2 pages, complete, signed by the placement supervisor.", "A confidentiality undertaking for Lukas Natby, dated 24 April 2026; 2 pages, complete, signed by the intern himself.", "A one-page IT equipment loan form for Lukas Natby, dated 6 May 2026, signed by the IT equipment loans officer.", "A one-page emergency contact form for Lukas Natby, dated 24 June 2026.", "A workplace induction checklist for Lukas Natby, dated 1 August 2026; 2 pages, complete. The last page is cropped where the signature would be, so it is not known whether it is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 756}} {"id": "isc-te-00466-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silberg & Co", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "19 June 2026"}, "checklist": ["Venue access instructions, issued within the last 3 months", "Cancellation policy acceptance, signed", "Payment confirmation, issued within the last 3 months", "Prerequisite certificate", "Delegate photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "course booking EZ-28200", "reference": "MC-76518"}, "cover note": "Hi, please find attached the pack for review. My colleague has already checked this pack before sending it on to you. Please let me know if you need anything further.", "documents received": ["Payment confirmation for course booking EZ-28200. Date of issue: 14 June 2026. Single page.", "Course booking form for course booking EZ-28200. Date of issue: 2 April 2026. 2 pages, complete. Signed by the delegate.", "Prerequisite certificate for course booking EZ-28200. Date of issue: 10 June 2026. Single page.", "File scan_0027.pdf. The file will not open, so its contents cannot be seen.", "Cancellation policy acceptance for course booking EZ-28200. Date of issue: 19 May 2026. Signed by the delegate. Single page.", "Venue access instructions for course booking EZ-28200. Date of issue: 30 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00129-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Austmere Partners", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "31 July 2026"}, "checklist": ["Check that the signed franchise agreement counterpart is signed.", "Check that the franchise application form is signed.", "Check that the operator licence is valid and has not expired on the date of the review.", "Check that the franchise disclosure document receipt was issued within the last 3 months and is signed.", "If the franchisee intends to operate through a company rather than as an individual, also check the shareholder agreement extract is signed.", "Check that the fit-out cost estimate was issued within the last 6 months and is signed."], "submission": {"case": {"name": "Norvberg Inc", "reference": "LJ-79438", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "documents received": ["Franchise application form for Norvberg Inc, dated 6 May 2026. 3 pages, complete. Signed by an authorised signatory for the franchisee.", "Franchise disclosure document receipt for Norvberg Inc, dated 26 July 2026. 1 page. Signed by an authorised signatory for the franchisee.", "Training course completion certificate for Norvberg Inc, dated 12 April 2026. 1 page.", "Fit-out cost estimate for Norvberg Inc, dated 13 May 2026. 4 pages, complete. Signed by an authorised signatory for the franchisee.", "Operator licence for Norvberg Inc, expiry date 5 December 2027. 2 pages, complete.", "Signed franchise agreement counterpart for Norvberg Inc, dated 2 May 2026. 12 pages, complete. Signed by an authorised signatory for the franchisor."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 791}} {"id": "isc-te-00320-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Hondwick plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "9 September 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "If the account will be run by an external agency, also: agency access agreement (signed)", "Account request form (signed)", "Account purpose statement", "Naming convention approval (signed)", "Platform terms acceptance record (signed)"], "submission": {"case": {"name": "new social media account ZP-18379", "reference": "MR-88769", "details": ["The account will be run by an external agency."]}, "documents received": ["Account closure procedure - ZP-18379.pdf. An account closure procedure for new social media account ZP-18379, dated 1 August 2026. It is a single page.", "Platform terms acceptance record - ZP-18379.pdf. A platform terms acceptance record for new social media account ZP-18379, dated 24 August 2026, on a single page. It is signed by the account administrator.", "Naming convention approval - ZP-18379.pdf. A naming convention approval for new social media account ZP-18379, dated 5 August 2026, on a single page. It is signed by the social media governance lead.", "Account request form - ZP-18379.pdf. An account request form for new social media account ZP-18379, dated 23 June 2026, on a single page. It is signed by the requesting marketing manager.", "Agency access agreement - ZP-18379.pdf. An agency access agreement for new social media account ZP-18379, dated 15 August 2026. 2 pages, complete. It is signed by the agency's account director.", "Account purpose statement - ZP-18379.pdf. An account purpose statement for new social media account ZP-18379, dated 14 July 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 866}} {"id": "isc-te-00221-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Uldham BV", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "12 May 2026"}, "checklist": ["Check the asbestos survey is in the pack.", "Check the floor load capacity report is in the pack, signed.", "Check the fire safety certificate is in the pack and valid (not expired) on the date of the review.", "Check the planning permission is in the pack.", "Check the racking inspection report is in the pack, issued within the last 12 months, signed."], "submission": {"case": {"name": "warehouse UO-70250", "reference": "NZ-96154"}, "documents received": ["floor-load-capacity-report_UO-70250.pdf. A floor load capacity report for warehouse UO-70250, dated 26 February 2026, signed by the structural engineer. 3 pages, complete.", "fire-safety-certificate_UO-70250.pdf. A fire safety certificate for warehouse UO-70250, expiring 21 February 2027. 2 pages, complete.", "asbestos-survey_UO-70250.pdf. An asbestos survey for warehouse UO-70250, dated 14 February 2026. 5 pages, complete.", "planning-permission_UO-70250.pdf. A planning permission for warehouse UO-70250, dated 3 March 2026. 2 pages, complete.", "photograph-of-racking_UO-70250.pdf. A photograph of racking for warehouse UO-70250, dated 9 July 2025, with no inspector details, signed by the site manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00293-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Glenford GmbH", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "14 April 2026"}, "checklist": ["If the job involves working at height above 2 metres, also: permit to work at height (issued within the last 1 months, signed)", "If the job will take place in an occupied office, also: occupier notification letter (issued within the last 1 months, signed)", "access authorisation slip (signed)", "cost estimate (issued within the last 3 months, signed)", "location details sheet", "photographs of the fault (issued within the last 3 months)"], "submission": {"case": {"name": "maintenance request JO-3858", "reference": "WB-64559", "details": ["The job involves working at height above two metres.", "The job will take place in an occupied office."]}, "documents received": ["Photographs of the fault. The photographs relate to maintenance request JO-3858 and show their date of issue as 25 March 2026. Pages 1 to 1 are included and the total number of pages is not shown anywhere on the document.", "Cost estimate. The estimate is for maintenance request JO-3858 and shows its date of issue as 29 January 2026. It is 2 pages, complete, and is signed by the estimating surveyor.", "Access authorisation slip. The slip relates to maintenance request JO-3858 and shows its date of issue as 2 January 2026. It is 1 page and carries the signature of the site access controller.", "Occupier notification letter. The letter concerns maintenance request JO-3858 and shows its date of issue as 6 April 2026. It is 1 page and is signed by the facilities coordinator.", "Permit to work at height. The permit relates to maintenance request JO-3858 and shows its date of issue as 2 April 2026. It is 1 page and carries the signature of the authorising manager.", "Location details sheet. The sheet covers maintenance request JO-3858 and shows its date of issue as 5 February 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 873}} {"id": "isc-te-00208-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Urvmore SAS", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "3 September 2026"}, "checklist": ["Previous flexible working requests record, issued within the last 24 months", "Trial period proposal, signed", "Flexible working request form, signed", "Line manager opinion note, issued within the last 2 months and signed", "If the request is to work entirely from home, also: home working equipment checklist, signed"], "submission": {"case": {"name": "Hannah Wadingham", "reference": "IR-86010", "details": ["The request is to work entirely from home."]}, "cover note": "Could you approve this quickly? All the paperwork is in order.", "documents received": ["Line_manager_opinion_note_2026-08-28.pdf. Line manager opinion note for Hannah Wadingham, dated 28 August 2026. 2 pages, complete. Signed by the line manager.", "Previous_flexible_working_requests_record_2024-10-05.pdf. Previous flexible working requests record for Hannah Wadingham, dated 5 October 2024. 1 page.", "Trial_period_proposal_2026-07-29.pdf. Trial period proposal for Hannah Wadingham, dated 29 July 2026. 1 page. Signed by the line manager.", "Home_working_equipment_checklist_2026-05-27.pdf. Home working equipment checklist for Hannah Wadingham, dated 27 May 2026. 2 pages, complete. Signed by the employee.", "Flexible_working_request_form_2026-06-11_pages_1-2_of_3.pdf. Flexible working request form for Hannah Wadingham, dated 11 June 2026. Only pages 1 to 2 of 3 are included. Signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00381-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Teskhurst Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "10 July 2026"}, "checklist": ["Engineer's service report, issued within the last 1 months and signed", "System pressure test results, issued within the last 1 months and signed", "Asset condition photograph sheet, issued within the last 1 months", "Plant room access sign-in sheet", "Refrigerant top-up log, issued within the last 1 months and signed", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "If refrigerant was added during the service, also: refrigerant recovery note, issued within the last 1 months and signed"], "submission": {"case": {"name": "air conditioning system OO-39937", "reference": "DM-20771", "details": ["Refrigerant was added during the service."]}, "documents received": ["Condition_Photos_OO-39937.pdf. Asset condition photograph sheet for air conditioning system OO-39937, dated 29 June 2026. 2 pages, complete.", "Service_Report_OO-39937.pdf. Engineer's service report for air conditioning system OO-39937, dated 27 June 2026. 3 pages, complete. Signed by the service engineer.", "F_Gas_Certificate_OO-39937.pdf. Engineer F-gas handling certificate for air conditioning system OO-39937, with an expiry date of 2 July 2028. Single page.", "Thermostat_Certificate_OO-39937.pdf. Thermostat calibration certificate for air conditioning system OO-39937, dated 25 October 2025. Single page.", "Recovery_Note_OO-39937.pdf. Refrigerant recovery note for air conditioning system OO-39937, dated 21 June 2026. Single page. Signed by the recovering engineer.", "Top_Up_Log_QA-19462.pdf. Refrigerant top-up log for air conditioning system QA-19462, dated 8 July 2026. Single page. Signed by the service engineer.", "Leak_Check_OO-39937.pdf. F-gas leak check record for air conditioning system OO-39937, dated 17 September 2025. 2 pages, complete. Signed by the inspecting engineer.", "Sign_In_OO-39937.pdf. Plant room access sign-in sheet for air conditioning system OO-39937, dated 24 June 2026. Single page.", "Pressure_Test_OO-39937.pdf. System pressure test results for air conditioning system OO-39937, dated 4 July 2026. 2 pages, complete. Signed by the testing engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1044}} {"id": "isc-te-00268-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zaldby BV", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "8 June 2026"}, "checklist": ["If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review.", "Travel insurance quote, issued within the last 1 months.", "Passport details form, signed.", "Hotel availability printout, issued within the last 1 months, signed.", "Booking request form, signed.", "Customer deposit receipt, issued within the last 3 months.", "Special requests note, signed."], "submission": {"case": {"name": "holiday booking TG-76662", "reference": "VD-54906", "details": ["The booking includes a child traveller."]}, "cover note": "Here is the pack for holiday booking TG-76662, reference VD-54906. I am not sure everything needed is there, so please check it carefully.", "documents received": ["Customer deposit receipt for holiday booking TG-76662. Date of issue: 30 April 2026. 1 page.", "Travel insurance quote for holiday booking TG-76662. Date of issue: 20 May 2026. 2 pages, complete.", "Package holiday brochure page for holiday booking TG-76662. Date of issue: 28 April 2026. 1 page.", "Special requests note for holiday booking TG-76662. Date of issue: 21 May 2026. 1 page. Signed by the reservations agent.", "Booking request form for holiday booking TG-76662. Date of issue: 15 March 2026. 2 pages, complete. Signed by the reservations agent.", "Child passport copy for holiday booking TG-76662. Expiry date shown: 30 September 2026. 1 page.", "Hotel availability printout for holiday booking TG-76662. Date of issue: 28 May 2026. 2 pages, complete. Signed by the hotel reservations manager.", "Passport details form for holiday booking TG-76662. Date of issue: 3 March 2026. 1 page. Signed by the lead traveller.", "Flight availability printout for holiday booking TG-76662. Date of issue: 27 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The task is to decide whether the pack measures up to the checklist. Go through each checklist line that applies to this case, one at a time. A required document counts only if it is the kind of document the checklist lists (not one that is merely similar), if it concerns the subject of the case, if all its pages are present, if it is signed wherever the checklist asks for a signature, if it has not expired by the review date, and if it was issued within the period the checklist allows. A conditional line applies to the case only when its circumstance holds. complete: all applicable lines are met, and extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may mislead, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "variant-55", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 960}} {"id": "isc-te-00448-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Veystead Inc", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "24 July 2026"}, "checklist": ["Credit card in the driver's name (valid, i.e. not expired, on the date of the review, signed)", "Vehicle condition report (signed)", "Passport (valid, i.e. not expired, on the date of the review, signed)", "If the booking includes crossing a land border, also: cross-border travel permission (signed)", "Booking voucher (issued within the last 6 months)", "Insurance excess waiver certificate (valid, i.e. not expired, on the date of the review)", "Driving licence (valid, i.e. not expired, on the date of the review, signed)"], "submission": {"case": {"name": "Amelia Tadridge", "reference": "LS-38914", "details": ["The booking includes crossing a land border."]}, "cover note": "Please accept my apologies for this pack. It was put together in a rush.", "documents received": ["Insurance excess waiver certificate, Amelia Tadridge. Expiry date: 3 June 2027. 2 pages, complete.", "Credit card in the driver's name, Amelia Tadridge. Expiry date: 25 February 2028. Single page. Signed by the cardholder.", "Vehicle condition report, Amelia Tadridge. Date of issue: 29 April 2026. 2 pages, complete. Signed by the branch counter staff member.", "Fuel policy sheet, Amelia Tadridge. Date of issue: 12 June 2026. Single page. Signed by the branch counter staff member.", "Passport, Amelia Tadridge. Expiry date: 17 February 2028. Single page. Signed by the passport holder.", "Driving licence, Amelia Tadridge. Expiry date: 9 December 2026. 2 pages, complete. Signed by the licence holder.", "Cross-border travel permission, Amelia Tadridge. Date of issue: 28 June 2026. Single page. Signed by the branch counter staff member.", "Booking voucher, Amelia Tadridge. Date of issue: 25 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "partial", "defect": "signed", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 872}} {"id": "isc-te-00109-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Veymere SAS", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "14 April 2026"}, "checklist": ["If the seller intends to list food or cosmetic products, also provide: safety compliance certificate (issued within the last 12 months)", "proof of trading address (issued within the last 3 months)", "product catalogue declaration (signed)", "authorised representative ID copy (valid (not expired) on the date of the review)", "business registration certificate", "returns policy statement (signed)"], "submission": {"case": {"name": "Ulmmore Ltd", "reference": "UN-41460", "details": ["The seller does not intend to list food or cosmetic products."]}, "documents received": ["Authorised representative ID copy - Ulmmore Ltd.pdf. An authorised representative ID copy for Ulmmore Ltd showing an expiry date of 12 July 2027. Single page.", "Returns policy statement - Ulmmore Ltd.pdf. A returns policy statement for Ulmmore Ltd, dated 27 February 2026. 2 pages, complete. Signed by the operations manager.", "Business registration certificate - Ulmmore Ltd.pdf. A business registration certificate for Ulmmore Ltd, dated 1 March 2026. Single page.", "Proof of trading address - Ulmmore Ltd.pdf. A proof of trading address for Ulmmore Ltd, dated 16 February 2026. Single page.", "Product catalogue declaration - Ulmmore Ltd.pdf. A product catalogue declaration for Ulmmore Ltd, dated 19 March 2026. 4 pages, complete. Signed by the managing director."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist. Work through every checklist line that applies to this case. Only a document that is the kind listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows counts as satisfying a required document. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-48", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00398-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Prydhaven Ltd", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "3 July 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include the mediation request confirmation, issued within the last 1 months and signed", "Cure period expiry calculation, issued within the last 1 months and signed", "Losses calculation statement, issued within the last 1 months and signed", "Breach evidence log, issued within the last 1 months and signed", "Default notice previously served, issued within the last 6 months and signed", "Termination clause legal opinion, issued within the last 1 months and signed", "Original service agreement copy"], "submission": {"case": {"name": "Aldstow Group", "reference": "KZ-59584", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Losses_calculation_statement_Aldstow_Group_13_June_2026.pdf — Losses calculation statement concerning Aldstow Group, dated 13 June 2026. 3 pages, complete. Signed by the Finance Director.", "Original_service_agreement_copy_Aldstow_Group_23_April_2026.pdf — Original service agreement copy concerning Aldstow Group, dated 23 April 2026. 10 pages, complete.", "Cure_period_expiry_calculation_Aldstow_Group_18_June_2026.pdf — Cure period expiry calculation concerning Aldstow Group, dated 18 June 2026. 2 pages, complete. Signed by the Contracts Manager.", "Breach_evidence_log_Aldstow_Group_13_June_2026.pdf — Breach evidence log concerning Aldstow Group, dated 13 June 2026. 6 pages, complete. Signed by the Contract Compliance Officer.", "Mediation_request_confirmation_Aldstow_Group_29_June_2026.pdf — Mediation request confirmation concerning Aldstow Group, dated 29 June 2026. 1 page. Signed by the Head of Dispute Resolution.", "Termination_clause_legal_opinion_Aldstow_Group_1_July_2026.pdf — Termination clause legal opinion concerning Aldstow Group, dated 1 July 2026. 5 pages, complete. Signed by the Legal Counsel.", "Default_notice_previously_served_Aldstow_Group_16_June_2026.pdf — Default notice previously served on Aldstow Group, dated 16 June 2026. 1 page. Signed by the Contracts Manager."]}}, "question": {"type": "choice", "instructions": "The question to answer is whether the pack stands complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "signed", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-63", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 978}} {"id": "isc-te-00393-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Heskbrook Inc", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "3 April 2026"}, "checklist": ["If the property is a listed building, also: listed building consent for the repairs (signed)", "If the flood water reached the upper floor of the property, also: upper floor damage schedule (signed)", "debris removal invoice (issued within the last 6 months)", "buildings insurance policy schedule", "utility supplier's letter confirming the supply was cut off (issued within the last 12 months)", "council flood warning notice (issued within the last 12 months)", "flood claim form (signed)", "drying contractor's certificate of completion (issued within the last 6 months, signed)"], "submission": {"case": {"name": "property RN-72349", "reference": "ME-41465", "details": ["The property is a listed building.", "The flood water reached the upper floor of the property."]}, "documents received": ["Utility supplier's letter confirming the supply was cut off. Dated 2 May 2025 and relating to property RN-72349. 1 page.", "Drying contractor's certificate of completion. Dated 9 January 2026 and relating to property RN-72349. 2 pages, complete. Signed by the drying contractor.", "Photographs of flood water in the rooms. Dated 27 March 2026 and relating to property RN-72349. 3 pages, complete.", "Upper floor damage schedule. Dated 21 December 2025 and relating to property RN-72349. 3 pages, complete. Signed by the loss adjuster.", "Buildings insurance policy schedule. Dated 3 March 2026 and relating to property RN-72349. 5 pages, complete.", "Council flood warning notice. Dated 5 June 2025 and relating to property RN-72349. 1 page.", "Listed building consent for the repairs. Dated 25 February 2026 and relating to property RN-72349. 2 pages, complete. Signed by the listed building consent officer.", "Debris removal invoice. Dated 17 November 2025 and relating to property RN-72349. 1 page.", "Flood claim form. Dated 30 January 2026 and relating to property RN-72349. 5 pages, complete. Signed by the policyholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "all pages present", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 954}} {"id": "isc-te-00252-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Belmfell LLP", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "12 May 2026"}, "checklist": ["Facility access application form, signed", "Photo identity document, valid (not expired) on the date of the review", "Home institution endorsement letter, issued within the last 6 months and signed", "Radiation safety training certificate, issued within the last 24 months and signed", "Beam time or instrument booking confirmation", "Host scientist invitation letter, issued within the last 6 months and signed"], "submission": {"case": {"name": "Pieter Grubfield", "reference": "IS-40676"}, "documents received": ["Facility access application form - Grubfield.pdf. A facility access application form for Pieter Grubfield, dated 13 April 2026. 2 pages, complete. It is signed by the applicant.", "Experiment safety clearance form - Grubfield.pdf. An experiment safety clearance form for Pieter Grubfield, dated 13 January 2026. 3 pages, complete. It is signed by the host scientist.", "Photo identity document - Grubfield.pdf. A photo identity document for Pieter Grubfield showing an expiry date of 20 September 2027. Single page.", "Radiation safety training certificate - Grubfield.pdf. A radiation safety training certificate for Pieter Grubfield, issued on 23 October 2024. Single page, signed by the training provider.", "Beam time confirmation - Grubfield.pdf. A beam time or instrument booking confirmation for Pieter Grubfield, dated 4 March 2026. Single page.", "Host scientist invitation letter - Grubfield.pdf. A host scientist invitation letter for Pieter Grubfield, issued on 16 January 2026. Single page, signed by the host scientist.", "Home institution endorsement letter - Grubfield 4 Nov 2025.pdf. A home institution endorsement letter for Pieter Grubfield, issued on 4 November 2025. Single page, signed by the head of department."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 849}} {"id": "isc-te-00435-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Eskcourt SAS", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "5 March 2026"}, "checklist": ["Confirm the complaint category code sheet is present.", "If the complaint alleges a member of staff behaved rudely, also confirm the staff member written response (signed) is present.", "Confirm the original complaint record is present and was issued within the last 6 months.", "Confirm the policy breach summary is present, was issued within the last 3 months, and is signed.", "Confirm the proposed resolution letter draft is present and is signed.", "Confirm the store incident report is present, was issued within the last 3 months, and is signed.", "Confirm the goodwill gesture approval note is present, was issued within the last 1 months, and is signed."], "submission": {"case": {"name": "escalated complaint AZ-62550", "reference": "RC-36204", "details": ["The complaint alleges a member of staff behaved rudely."]}, "documents received": ["Proposed resolution letter draft, escalated complaint AZ-62550. Date of issue: 24 December 2025. 2 pages, complete. Signed by the customer relations manager.", "Original complaint record, escalated complaint AZ-62550. Date of issue: 22 October 2025. 2 pages, complete.", "Complaint escalation form, escalated complaint AZ-62550. Date of issue: 19 February 2026. 2 pages, complete. Signed by the customer relations team leader.", "Complaint category code sheet, escalated complaint AZ-62550. Date of issue: 20 February 2026. 1 page.", "Staff member written response, escalated complaint AZ-62550. Date of issue: 2 February 2026. 1 page. Signed by the staff member.", "Policy breach summary, escalated complaint AZ-62550. Date of issue: 18 February 2026. 2 pages, complete. Signed by the store manager.", "Goodwill gesture approval note, escalated complaint AZ-62550. Date of issue: 26 February 2026. 1 page. Signed by the head of customer relations."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 889}} {"id": "isc-te-00366-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Jorcrest Ltd", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "26 June 2026"}, "checklist": ["Outstanding advance clearance check, signed.", "Travel policy extract showing advance eligibility.", "Travel advance request form, signed.", "Costed trip estimate sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "Marek Arnwick", "reference": "WD-60422"}, "cover note": "Please accept my apologies that this pack was put together in a rush.", "documents received": ["Travel policy extract showing advance eligibility for Marek Arnwick, dated 9 April 2026, one page.", "Costed trip estimate sheet for Marek Arnwick, dated 9 June 2026, one page. It is signed by Marek Arnwick.", "Travel advance request form for Marek Arnwick, dated 26 March 2026, one page. It is signed by Marek Arnwick.", "Outstanding advance clearance check for Marek Arnwick, dated 26 April 2026, one page. It is signed by the accounts payable reviewer.", "Personal loan application to a bank for Marek Arnwick, dated 26 March 2026, one page. It is signed by Marek Arnwick."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack fulfils the checklist. Examine every checklist line that applies to this case. For a required document to count, it must be the kind listed (not a similar kind), be about the case's subject, have all its pages, be signed wherever the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line fails. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-11", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 675}} {"id": "isc-te-00373-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Selvmont & Co", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "24 April 2026"}, "checklist": ["Signature verification record, signed", "Card replacement request form, signed", "Photo identification, valid (not expired) on the date of the review", "Confirmation of contact details, issued within the last 3 months", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "If the card was stolen rather than lost, also: police report reference document, issued within the last 1 months, signed"], "submission": {"case": {"name": "Matthias Sabopoulos", "reference": "SX-64326", "details": ["The cardholder is at their home address.", "The card was stolen rather than lost."]}, "documents received": ["Card replacement request form for Matthias Sabopoulos, dated 4 February 2026. 2 pages, complete. It is signed by the cardholder.", "Photo identification for Matthias Sabopoulos, showing an expiry date of 9 October 2028. Single page.", "Signature verification record for Matthias Sabopoulos, dated 1 February 2026. Single page. The part of the page where a signature would be cannot be seen, as a sticky note covers the signature block, so it is not known whether it is signed.", "Confirmation of contact details for Matthias Sabopoulos, dated 7 April 2026. Single page.", "Police report reference document for Matthias Sabopoulos, dated 14 April 2026. Single page. It is signed by the reporting officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 738}} {"id": "isc-te-00423-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pentmont Group", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 May 2026"}, "checklist": ["Line manager approval, signed.", "Visa entry requirement printout, issued within the last 3 months.", "Hotel booking confirmation.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Flight itinerary quote, issued within the last 1 months."], "submission": {"case": {"name": "business trip NZ-61217", "reference": "SD-60329", "details": ["The trip involves travel to a country requiring a visa."]}, "documents received": ["Flight itinerary quote for business trip NZ-61217, dated 23 May 2026, 2 pages, complete.", "Visa approval letter for business trip NZ-61217, dated 16 March 2026, 2 pages, complete.", "Hotel booking confirmation for business trip NZ-61217, dated 6 February 2026, 2 pages, complete.", "Passport copy for international travel for business trip NZ-61217, showing an expiry date of 13 June 2027, 1 page.", "Visa entry requirement printout for business trip NZ-61217, dated 20 May 2026, page 1 included, with the total number of pages not shown anywhere.", "Line manager approval for business trip NZ-61217, dated 27 April 2026, 1 page, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 762}} {"id": "isc-te-00489-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskwell SAS", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "8 May 2026"}, "checklist": ["Check for a signed franchise agreement counterpart.", "Check for a pilot operation audit report, issued within the last 6 months and signed.", "If the franchisee intends to operate through a company rather than as an individual, also check for a shareholder agreement extract, signed.", "Check for a training course completion certificate, issued within the last 12 months.", "Check for a franchise application form, signed."], "submission": {"case": {"name": "Prydthorpe Ltd", "reference": "GS-36628", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "documents received": ["Franchise application form for Prydthorpe Ltd, dated 13 March 2026. 3 pages, complete. Signed by the franchisee's director.", "Training course completion certificate for Prydthorpe Ltd, dated 12 April 2026. Single page.", "Signed franchise agreement counterpart for Prydthorpe Ltd, dated 15 February 2026. 12 pages, complete. Signed by the franchisor's authorised representative.", "Pilot operation audit report on Prydthorpe Ltd, dated 23 March 2026. 8 pages, complete. Signed by the auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 700}} {"id": "isc-te-00337-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Marlgate & Co", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "19 August 2026"}, "checklist": ["Confirm the pack contains a passport style photograph issued within the last 6 months.", "Confirm the pack contains a photo driving licence that is valid, not expired, on the date of the review, 19 August 2026.", "If the applicant is applying for a hackney carriage licence rather than private hire, also confirm the pack contains a vehicle specification sheet for the hackney carriage.", "Confirm the pack contains a medical examination certificate issued within the last 6 months and signed.", "Confirm the pack contains a signed driver declaration of convictions.", "If the applicant has lived at an address outside the country in the last five years, also confirm the pack contains a criminal record certificate from overseas issued within the last 3 months."], "submission": {"case": {"name": "Lotte Wadova", "reference": "JI-80519", "details": ["The applicant is applying for a hackney carriage licence rather than private hire.", "The applicant has lived at an address outside the country in the last five years."]}, "documents received": ["Overseas_criminal_record_certificate_Wadova_JI80519.pdf: A criminal record certificate from overseas for Lotte Wadova. It shows a date of issue of 1 July 2026. 4 pages, complete.", "Medical_certificate_Wadova_JI80519.pdf: A medical examination certificate for Lotte Wadova. It shows a date of issue of 28 July 2026. 2 pages, complete. It is signed by the examining doctor.", "Driving_licence_Wadova_JI80519.pdf: A photo driving licence for Lotte Wadova. The date on it is smudged and cannot be read. 2 pages, complete.", "Vehicle_specification_sheet_Wadova_JI80519.pdf: A vehicle specification sheet for the hackney carriage relating to Lotte Wadova. It shows a date of issue of 4 June 2026. 2 pages, complete.", "Photograph_Wadova_JI80519.pdf: A passport style photograph of Lotte Wadova. It shows a date of issue of 30 June 2026. It is a single page.", "Convictions_declaration_Wadova_JI80519.pdf: A driver declaration of convictions for Lotte Wadova. It shows a date of issue of 6 May 2026. It is a single page. It is signed by the driver.", "Knowledge_test_pass_certificate_Wadova_JI80519.pdf: A knowledge test pass certificate for Lotte Wadova. It shows a date of issue of 17 May 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1009}} {"id": "isc-te-00349-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Fervvik Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "17 July 2026"}, "checklist": ["Nominated store preference form, signed", "Terms and conditions acceptance sheet, signed", "Initial points balance statement, issued within the last 3 months", "Identity verification document, valid (not expired) on the date of the review", "If the customer is transferring points from a rival scheme, also: points transfer evidence statement, issued within the last 3 months and signed", "Customer contact details sheet, signed"], "submission": {"case": {"name": "Giulia Natell", "reference": "BP-19825", "details": ["The customer is transferring points from a rival scheme."]}, "cover note": "Hi, please find the pack attached. A colleague has already checked this pack, so it should be ready for your review. Best wishes, Antoine", "documents received": ["terms_and_conditions_acceptance_sheet_Giulia_Natell.pdf. Terms and conditions acceptance sheet for Giulia Natell, dated 26 June 2026. A single page, signed by Giulia Natell.", "nominated_store_preference_form_Giulia_Natell.pdf. Nominated store preference form for Giulia Natell, dated 28 June 2026. A single page, signed by Giulia Natell.", "initial_points_balance_statement_Giulia_Natell.pdf. Initial points balance statement for Giulia Natell, dated 11 July 2026. A single page.", "customer_contact_details_sheet_Giulia_Natell.pdf. Customer contact details sheet for Giulia Natell, dated 20 March 2026. A single page, signed by Giulia Natell.", "identity_verification_document_Giulia_Natell.pdf. Identity verification document for Giulia Natell, with an expiry date of 10 May 2027. A single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00068-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Halvby LLP", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "6 April 2026"}, "checklist": ["Safeguarding referral form, issued within the last 12 months, signed", "Needs assessment report, signed", "Support plan, signed", "Financial assessment form, signed", "Recent bank statements, issued within the last 3 months", "Proof of identity, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Vikram Nebbberg", "reference": "VI-15919"}, "documents received": ["Needs assessment report for Vikram Nebbberg. Date of issue: 4 February 2026. 12 pages, complete. Signed by the lead assessor.", "Financial assessment form for Vikram Nebbberg. Date of issue: 3 January 2026. 6 pages, complete. Signed by the financial assessment officer.", "Safeguarding referral form for Vikram Nebbberg. Date of issue: 22 December 2025. 2 pages, complete. Signed by the safeguarding lead.", "Recent bank statements for Vikram Nebbberg. Date of issue: 15 February 2026. 8 pages, complete.", "Proof of identity for Vikram Nebbberg. Expiry date: 31 October 2027. Single page.", "Support plan for Vikram Nebbberg. Date of issue: 26 January 2026. 6 pages, complete. Signed by the care coordinator.", "Benefit entitlement letters for Vikram Nebbberg. Date of issue: 28 June 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 767}} {"id": "isc-te-00391-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Ulmcourt Ltd", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "2 June 2026"}, "checklist": ["Loss adjuster's inspection report, issued within the last 6 months and signed.", "Buildings insurance policy schedule.", "Flood claim form, signed.", "Council flood warning notice, issued within the last 12 months.", "Drying contractor's certificate of completion, issued within the last 6 months and signed.", "Debris removal invoice, issued within the last 6 months."], "submission": {"case": {"name": "property DY-13315", "reference": "DZ-33746"}, "documents received": ["Loss adjuster's inspection report for property DY-13315, dated 27 February 2026. 6 pages, complete. Signed by the loss adjuster.", "Council flood warning notice for property DY-13315, dated 7 March 2026. Single page.", "Buildings insurance policy schedule for property DY-13315, dated 26 April 2026. 5 pages, complete.", "Flood risk map printout for the area around property DY-13315, dated 24 March 2026. 5 pages, complete. Signed by the loss adjuster.", "Debris removal invoice for property DY-13315, dated 25 April 2026. Single page.", "Drying contractor's certificate of completion for property DY-13315, dated 28 March 2026. 2 pages, complete. Signed by the drying contractor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 752}} {"id": "isc-te-00315-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Haskwell Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "7 September 2026"}, "checklist": ["Obtain a financial stability statement issued within the last 12 months and signed.", "Obtain a supplier capacity declaration issued within the last 12 months and signed.", "Obtain a supplier corrective action plan issued within the last 6 months and signed.", "Obtain a supplier quality questionnaire issued within the last 12 months and signed."], "submission": {"case": {"name": "Nordlock GmbH", "reference": "XW-60086"}, "documents received": ["Scanned supplier quality questionnaire concerning Nordlock GmbH, dated 22 May 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Scanned financial stability statement concerning Nordlock GmbH, dated 12 April 2026. 2 pages, complete. Signed by the supplier's finance director.", "Scanned supplier capacity declaration concerning Nordlock GmbH, dated 9 August 2026. 2 pages, complete. Signed by the supplier's operations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 628}} {"id": "isc-te-00489-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskwell SAS", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "8 May 2026"}, "checklist": ["Check for a signed franchise agreement counterpart.", "Check for a pilot operation audit report, issued within the last 6 months and signed.", "If the franchisee intends to operate through a company rather than as an individual, also check for a shareholder agreement extract, signed.", "Check for a training course completion certificate, issued within the last 12 months.", "Check for a franchise application form, signed."], "submission": {"case": {"name": "Prydthorpe Ltd", "reference": "GS-36628", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "documents received": ["Funding agreement from a lender for Prydthorpe Ltd, dated 20 March 2026. 6 pages, complete. Signed by the lender's authorised signatory.", "Training course completion certificate for Prydthorpe Ltd, dated 12 April 2026. Single page.", "Franchise application form for Prydthorpe Ltd, dated 13 March 2026. 3 pages, complete. Signed by the franchisee's director.", "Signed franchise agreement counterpart for Prydthorpe Ltd, dated 15 February 2026. 12 pages, complete. Signed by the franchisor's authorised representative.", "Pilot operation audit report on Prydthorpe Ltd, dated 23 March 2026. 8 pages, complete. Signed by the auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 741}} {"id": "isc-te-00464-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Quelfell Ltd", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "15 April 2026"}, "checklist": ["If the property is being bought from a family member, also: independent purchase price assessment (issued within the last 3 months, signed)", "Mortgage application form (signed)", "Photo identity document (valid (not expired) on the date of the review)", "Property valuation report (issued within the last 6 months, signed)", "Employment certificate (issued within the last 1 months, signed)", "Sale and purchase agreement (signed)", "Proof of deposit (issued within the last 3 months)"], "submission": {"case": {"name": "property FN-50742", "reference": "TZ-90153"}, "cover note": "I am sending this pack on for your review; it has already been checked by a colleague.", "documents received": ["TZ-90153 Proof of deposit.pdf — Proof of deposit relating to property FN-50742. Date of issue: 2 March 2026. Single page.", "TZ-90153 Property valuation report.pdf — Property valuation report for property FN-50742. Date of issue: 24 March 2026. 10 pages, complete. Signed by the valuer.", "TZ-90153 Mortgage application form.pdf — Mortgage application form for property FN-50742. Date of issue: 25 January 2026. 6 pages, complete. Signed by the applicant.", "TZ-90153 Photo identity document.pdf — Photo identity document relating to property FN-50742. Expiry date: 29 April 2028. Single page.", "TZ-90153 Employment certificate.pdf — Employment certificate relating to property FN-50742. Date of issue: 30 March 2026. Single page. Signed by the employer.", "TZ-90153 Sale and purchase agreement.pdf — Sale and purchase agreement for property FN-50742. Date of issue: 26 December 2025. 9 pages, complete. Signed by the buyer and the seller.", "TZ-90153 Credit bureau report.pdf — Credit bureau report relating to property FN-50742. Date of issue: 13 April 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 923}} {"id": "isc-te-00362-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Dornham Ltd", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "27 July 2026"}, "checklist": ["Leaver notification form, signed.", "Equipment return receipt, issued within the last 1 months, signed.", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed.", "Final payroll cut-off note, issued within the last 1 months, signed.", "Service desk ticket closure summary, issued within the last 1 months.", "Shared mailbox handover record, issued within the last 1 months, signed.", "Non-disclosure reminder acknowledgement, signed."], "submission": {"case": {"name": "Niamh Gillock", "reference": "GB-48986", "details": ["The leaver held no privileged administrator accounts."]}, "documents received": ["An equipment return receipt for Niamh Gillock, dated 12 July 2026. Single page. Signed by the receiving IT asset officer.", "A leaver notification form for Niamh Gillock, dated 3 May 2026. 2 pages, complete. Signed by the line manager.", "A service desk ticket closure summary for Niamh Gillock, dated 10 July 2026. 3 pages, complete.", "An equipment return receipt for Niamh Gillock, dated 10 January 2026. Single page. Signed by the receiving IT asset officer.", "A shared mailbox handover record for Niamh Gillock, dated 23 July 2026. 2 pages, complete. Signed by the incoming mailbox owner.", "A final payroll cut-off note for Niamh Gillock, dated 16 July 2026. Single page. Signed by the payroll officer.", "A non-disclosure reminder acknowledgement for Niamh Gillock, dated 19 April 2026. Single page. Signed by Niamh Gillock."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 821}} {"id": "isc-te-00470-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Stervberg Ltd", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "9 March 2026"}, "checklist": ["Location details sheet", "Cost estimate issued within the last 3 months, signed", "Job request form, signed", "Parts order confirmation issued within the last 1 months", "Access authorisation slip, signed"], "submission": {"case": {"name": "maintenance request YF-33794", "reference": "GP-45887"}, "cover note": "Please accept my apologies for the state of the attached pack for maintenance request YF-33794, reference GP-45887, as it was assembled in a rush.", "documents received": ["Job request form for maintenance request YF-33794, dated 16 February 2026. 1 page. Signed by the requesting manager.", "Risk assessment for the task under maintenance request YF-33794, dated 21 January 2026. 5 pages, complete. Signed by the assessing officer.", "Planned completion date sheet for maintenance request YF-33794, dated 29 January 2026. 1 page. Signed by the facilities coordinator.", "Access authorisation slip for maintenance request YF-33794, dated 16 February 2026. 1 page. Signed by the site security officer.", "Location details sheet for maintenance request YF-33794, dated 23 January 2026. 1 page.", "Parts order confirmation for maintenance request YF-33794, dated 5 March 2026. 1 page.", "Cost estimate for maintenance request YF-33794, dated 7 February 2026. 2 pages, complete. Signed by the estimating supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00338-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Tarvvik SAS", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "7 September 2026"}, "checklist": ["Capacity assessment record, signed", "Proof of identity, valid (not expired) on the date of the review", "Safeguarding referral form, issued within the last 12 months, signed", "Support plan, signed"], "submission": {"case": {"name": "Claire Rumow", "reference": "KD-98368"}, "documents received": ["Safeguarding referral form for Claire Rumow, dated 20 July 2026. All 2 of its 2 pages are included (2 pages, complete). Signed by the referring officer.", "Support plan for Claire Rumow, dated 28 July 2026. All 6 of its 6 pages are included (6 pages, complete). Signed by the care coordinator.", "Financial assessment form for Claire Rumow, dated 7 July 2026. All 6 of its 6 pages are included (6 pages, complete). Signed by the financial assessment officer.", "Capacity assessment record for Claire Rumow, dated 30 July 2026. Only 1 of its 4 pages is included (pages 1-1 of 4). Signed by the assessing practitioner.", "Proof of identity for Claire Rumow. The expiry date shown is 5 October 2027. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 705}} {"id": "isc-te-00462-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Xanholm LLP", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "17 August 2026"}, "checklist": ["Account statement showing recent activity, issued within the last 1 months", "Photo identification, valid (not expired) on the date of the review", "Fraud questionnaire, signed", "Card replacement request form, signed", "Confirmation of contact details, issued within the last 3 months", "Lost card declaration, signed"], "submission": {"case": {"name": "Rory Tibow", "reference": "DN-27132"}, "documents received": ["Photo identification.pdf. This photo identification for Rory Tibow shows an expiry date of 16 October 2027. It is a single page.", "Confirmation of contact details.pdf. This confirmation of contact details for Rory Tibow has its date cut off. It is a single page.", "Card replacement request form.pdf. This card replacement request form for Rory Tibow is dated 25 May 2026. 2 pages, complete. It is signed by the cardholder.", "Account statement showing recent activity.pdf. This account statement showing recent activity for Rory Tibow is dated 7 August 2026. 3 pages, complete.", "Lost card declaration.pdf. This lost card declaration for Rory Tibow is dated 26 June 2026. It is a single page. It is signed by the cardholder.", "Fraud questionnaire.pdf. This fraud questionnaire for Rory Tibow is dated 8 July 2026. 2 pages, complete. It is signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 731}} {"id": "isc-te-00289-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Neskheim Ltd", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "2 June 2026"}, "checklist": ["Check that the course booking form is signed.", "Check that a prerequisite certificate is included.", "Check that the employer sponsorship letter was issued within the last 3 months and is signed.", "If the delegate requires an adjusted learning plan, also check that a learning support agreement is included and is signed.", "Check that a special requirements note is included.", "Check that the payment confirmation was issued within the last 3 months."], "submission": {"case": {"name": "course booking GA-88404", "reference": "DT-54396"}, "documents received": ["Employer sponsorship letter GA-88404.pdf. The letter is dated 11 May 2026 and concerns course booking GA-88404. Single page, signed by the employer's HR manager.", "Special requirements note GA-88404.pdf. The note is dated 13 February 2026 and concerns course booking GA-88404. Single page.", "Cancellation policy acceptance GA-88404.pdf. The acceptance is dated 15 May 2026 and concerns course booking GA-88404. Single page, signed by the delegate.", "Payment confirmation GA-88404.pdf. The confirmation is dated 29 March 2026 and refers to course booking GA-88404. Single page.", "Course booking form GA-88404.pdf. The form is dated 27 April 2026 and covers course booking GA-88404. 2 pages, complete, and signed by the delegate.", "Prerequisite certificate GA-88404.pdf. The certificate is dated 21 February 2026 and relates to course booking GA-88404. Single page."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete: every applicable line is met (extra documents do not matter). Reply incomplete: at least one applicable line is not met. Reply unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-15", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 821}} {"id": "isc-te-00170-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Ebrshaw Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "13 April 2026"}, "checklist": ["Proposed architecture diagram", "Migration and rollout plan", "Review board feedback summary (issued within the last 3 months, signed)", "Problem statement page", "Cost estimate sheet (issued within the last 6 months)", "If the design introduces a new third-party dependency, also: third-party dependency risk assessment (issued within the last 6 months, signed)", "If the design changes how customer data is stored, also: data protection review sign-off (signed)"], "submission": {"case": {"name": "design document UC-75490", "reference": "AO-68653", "details": ["The design introduces no new third-party dependency.", "The design does not change how customer data is stored."]}, "documents received": ["Review board feedback summary for design document UC-75490, dated 13 March 2026. 2 pages, complete. Signed by the review board chair.", "Cost estimate sheet for design document UC-75490, dated 20 February 2026. 2 pages, complete.", "Migration and rollout plan for design document UC-75490, dated 22 March 2026. 3 pages, complete.", "Proposed architecture diagram for design document UC-75490, dated 21 December 2025. Single page.", "Problem statement page for design document UC-75490, dated 19 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 742}} {"id": "isc-te-00401-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Yondwell Limited", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "31 July 2026"}, "checklist": ["Inbound unloading record, issued within the last 1 months and signed.", "Transfer completion confirmation, issued within the last 1 months and signed.", "Seal number log, issued within the last 1 months and signed.", "Transfer manifest, signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet, issued within the last 1 months and signed.", "Outbound loading record, issued within the last 1 months and signed.", "Cross-dock slot booking sheet, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer MZ-75713", "reference": "QF-14367", "details": ["The transfer includes a temperature-controlled load."]}, "cover note": "I am not sure that everything needed is there.", "documents received": ["Damaged goods exception sheet for cross-dock transfer MZ-75713, dated 26 July 2026, 1 page. It is signed by the goods-in clerk.", "Seal number log for cross-dock transfer MZ-75713, dated 12 July 2026, 1 page. It is signed by the cross-dock supervisor.", "Cross-dock chiller unit check sheet for cross-dock transfer MZ-75713, dated 28 July 2026, 1 page. It is signed by the refrigeration technician.", "Picking list for a single customer order on cross-dock transfer MZ-75713, dated 22 May 2026, 3 pages, complete. It is signed by the warehouse picker.", "Transfer completion confirmation for cross-dock transfer MZ-75713, dated 18 July 2026, 1 page. It is signed by the transport planner.", "Outbound loading record for cross-dock transfer MZ-75713, dated 25 July 2026, 1 page. It is signed by the outbound loading team leader.", "Transfer manifest for cross-dock transfer MZ-75713, dated 22 May 2026, 3 pages, complete. It is signed by the transport planner.", "Cross-dock slot booking sheet for cross-dock transfer MZ-75713, dated 11 July 2026, 1 page. It is signed by the slot booking coordinator.", "Inbound unloading record for cross-dock transfer MZ-75713, dated 10 July 2026, 1 page. It is signed by the inbound unloading team leader."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 816}} {"id": "isc-te-00054-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Hondhurst Inc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "11 March 2026"}, "checklist": ["Flammability test certificate, issued within the last 12 months", "Kit contents list", "Kit cost breakdown, issued within the last 3 months and signed", "If the kit includes an electrical display unit, also: electrical safety test certificate, issued within the last 12 months", "Brand colour specification", "Shipping manifest, issued within the last 1 months", "Waste disposal plan"], "submission": {"case": {"name": "merchandising kit XM-57664", "reference": "OC-82346", "details": ["The kit includes an electrical display unit."]}, "documents received": ["XM-57664 kit contents list.pdf — A kit contents list for merchandising kit XM-57664, dated 16 November 2025. 2 pages, complete.", "XM-57664 flammability test certificate.pdf — A flammability test certificate for merchandising kit XM-57664, dated 23 October 2025. It is a single page.", "XM-57664 shipping manifest.pdf — A shipping manifest for merchandising kit XM-57664, dated 7 March 2026. 2 pages, complete.", "XM-57664 brand colour specification.pdf — A brand colour specification for merchandising kit XM-57664, dated 14 December 2025. It is a single page.", "XM-57664 kit cost breakdown.pdf — A kit cost breakdown for merchandising kit XM-57664, dated 2 February 2026. 2 pages, complete. It is signed by the finance manager.", "XM-57664 waste disposal plan.pdf — A waste disposal plan for merchandising kit XM-57664, dated 23 January 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 852}} {"id": "isc-te-00209-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Corvley Limited", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "29 May 2026"}, "checklist": ["Check that the proposed working pattern plan is included and signed.", "Check that the flexible working request form is included and signed.", "Check that the impact assessment on the team is included and signed.", "If the employee has caring responsibilities for a dependent, also: check that the caring responsibilities statement is included and signed.", "Check that the trial period proposal is included and signed."], "submission": {"case": {"name": "Harry Holtisey", "reference": "NC-90327"}, "cover note": "Please find attached the pack for reference NC-90327. I am not sure everything needed is there, so please check when you review it.", "documents received": ["A previous flexible working requests record concerning Harry Holtisey, dated 12 July 2025. Single page.", "A caring responsibilities statement concerning Harry Holtisey, dated 14 February 2026. Single page. Signed by Harry Holtisey.", "A proposed working pattern plan concerning Harry Holtisey, dated 4 May 2026. 2 pages, complete. Signed by the line manager.", "An impact assessment on the team concerning Harry Holtisey, dated 1 February 2026. 3 pages, complete. Signed by the line manager.", "A trial period proposal concerning Harry Holtisey, dated 7 April 2026. Single page. Signed by the line manager.", "A file named scan_0427.pdf, dated 29 May 2026. Single page. The scan is too faint to read, so its contents cannot be seen.", "A flexible working request form concerning Harry Holtisey, dated 23 February 2026. 3 pages, complete. Signed by Harry Holtisey."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Step through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete if every applicable line is met (extra documents do not matter). Reply incomplete if at least one applicable line is not met. Reply unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, which may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "document present (circumstance not stated), plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-27", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 805}} {"id": "isc-te-00018-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silthorpe Group", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "15 April 2026"}, "checklist": ["Customer account details page, issued within the last 3 months", "Terms of sale acceptance log, issued within the last 12 months", "Customer order history extract, issued within the last 6 months", "Transaction record printout, issued within the last 3 months", "Fraud screening result sheet, issued within the last 3 months", "Chargeback response form, signed"], "submission": {"case": {"name": "disputed transaction NP-25742", "reference": "HU-11985"}, "documents received": ["Scanned fraud screening result sheet for disputed transaction NP-25742, dated 9 April 2026. 1 page.", "Scanned terms of sale acceptance log for disputed transaction NP-25742, dated 29 March 2026. 1 page.", "Scanned transaction record printout for disputed transaction NP-25742, dated 13 February 2026. 1 page.", "Scanned customer account details page for disputed transaction NP-25742, dated 17 February 2026. 1 page.", "Scanned customer order history extract for disputed transaction NP-25742, dated 21 January 2026. 2 pages, complete.", "Scanned chargeback response form for disputed transaction NP-25742, dated 9 April 2026. 2 pages, complete. The signature line is empty; the form is not signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 747}} {"id": "isc-te-00033-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Wendstead Limited", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "23 June 2026"}, "checklist": ["Loss adjuster's inspection report, issued within the last 6 months and signed", "Council flood warning notice, issued within the last 12 months", "Flood claim form, signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months"], "submission": {"case": {"name": "property SP-19466", "reference": "IK-48540"}, "documents received": ["drying_contractor_certificate_SP-19466.pdf - Drying contractor's certificate of completion for property SP-19466, dated 15 January 2026. 2 pages, complete. Signed by the drying contractor.", "loss_adjuster_inspection_report_SP-19466.pdf - Loss adjuster's inspection report for property SP-19466, dated 16 January 2026. 6 pages, complete. Signed by the loss adjuster.", "utility_supplier_letter_SP-19466.pdf - Utility supplier's letter confirming the supply was cut off at property SP-19466, dated 18 January 2026. Single page.", "council_flood_warning_notice_SP-19466.pdf - Council flood warning notice for property SP-19466, dated 7 November 2025. Single page.", "flood_claim_form_SP-19466_unsigned.pdf - Flood claim form for property SP-19466, dated 4 June 2026. 5 pages, complete. The signature line is empty; the form is not signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 773}} {"id": "isc-te-00409-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Jundwald Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "28 August 2026"}, "checklist": ["Audit finding sheets, signed", "Audit attendance sheet, signed", "Previous audit follow-up record, issued within the last 24 months, signed", "Audit interview notes, signed", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list, signed"], "submission": {"case": {"name": "internal audit AM-70822", "reference": "KP-15972"}, "documents received": ["Audit interview notes AM-70822.pdf. These notes, dated 26 June 2026, cover the interviews held during internal audit AM-70822. 3 pages, complete. They are signed by the auditor who conducted the interviews.", "Audit attendance sheet AM-70822.pdf. This single page, dated 16 August 2026, lists those present at internal audit AM-70822. It is signed by the lead auditor.", "Previous audit follow-up record AM-70822.pdf. Dated 16 October 2025, this record covers the follow-up actions from internal audit AM-70822. 2 pages, complete. It is signed by the quality manager.", "Internal audit plan AM-70822.pdf. Dated 21 June 2026, this plan sets out the scope and schedule of internal audit AM-70822. 2 pages, complete. It is signed by the quality manager.", "Calibration laboratory records sample list AM-70822.pdf. Dated 21 July 2026, this list identifies the calibration laboratory records sampled during internal audit AM-70822. 2 pages, complete. It is signed by the lead auditor.", "Audit finding sheets AM-70822.pdf. Dated 5 July 2026, the sheets record the findings of internal audit AM-70822. 2 pages, complete. Each sheet is signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide if it is complete. Check every checklist line that is applicable to this case. A required document only counts if it is the kind of document that the checklist lists (not a similar kind), if it is about the subject of the case, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the review date, and if it was issued within the period the checklist allows. A conditional line applies only in cases where its circumstance holds. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves instead.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-56", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 875}} {"id": "isc-te-00121-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jundmoor Partners", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "4 August 2026"}, "checklist": ["Drying contractor's certificate of completion, issued within the last 6 months and signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Buildings insurance policy schedule", "Council flood warning notice, issued within the last 12 months", "Flood claim form, signed"], "submission": {"case": {"name": "property KX-91092", "reference": "OX-34504"}, "documents received": ["d4_council_flood_warning_notice_KX91092.pdf — Council flood warning notice for property KX-91092, dated 1 March 2026. 1 page.", "d6_newspaper_clipping_KX91092.pdf — Newspaper clipping about flooding in another town, concerning property KX-91092, dated 1 March 2026. 1 page.", "d5_flood_claim_form_KX91092.pdf — Flood claim form for property KX-91092, dated 9 April 2026. 5 pages, complete. Signed by the claimant.", "d1_drying_contractors_certificate_of_completion_KX91092.pdf — Drying contractor's certificate of completion for property KX-91092, dated 17 May 2026. 2 pages, complete. Signed by the drying contractor.", "d3_buildings_insurance_policy_schedule_KX91092.pdf — Buildings insurance policy schedule for property KX-91092, dated 13 May 2026. 5 pages, complete.", "d2_photographs_of_flood_water_in_the_rooms_KX91092.pdf — Photographs of flood water in the rooms at property KX-91092, dated 19 July 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Work through every checklist line that applies to this case one by one. For a required document to count, it must be the exact kind of document listed (not a similar one), be about the subject of the case, contain all its pages, be signed where the checklist asks for a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line only applies when its circumstance holds for the case. complete: all applicable lines are met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-68", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 846}} {"id": "isc-te-00115-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Prydwyn LLP", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "7 April 2026"}, "checklist": ["Previous grievance outcome letter, issued within the last 24 months", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed", "Meeting invitation with rights explained, issued within the last 1 months", "Adjustment request record, issued within the last 3 months, signed", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed", "Witness list, signed", "Investigator appointment letter, issued within the last 3 months", "Grievance procedure acknowledgement, issued within the last 3 months, signed"], "submission": {"case": {"name": "Helen Zellcombe", "reference": "JL-16752", "details": ["The grievance makes no allegation of bullying.", "The grievance is against the employee's direct manager."]}, "documents received": ["Written grievance statement concerning Helen Zellcombe, dated 10 February 2026. 3 pages, complete. Signed by the employee.", "Witness list concerning Helen Zellcombe, dated 1 April 2026. 1 page. Signed by the case handler.", "Alternative manager reporting line note concerning Helen Zellcombe, dated 28 December 2025. 1 page. Signed by the alternative manager.", "Meeting invitation with rights explained concerning Helen Zellcombe, dated 5 April 2026. 1 page.", "Evidence bundle index concerning Helen Zellcombe, dated 14 March 2026. 2 pages, complete. Signed by the case handler.", "Investigator appointment letter concerning Helen Zellcombe, dated 2 April 2026. 1 page.", "Previous grievance outcome letter concerning Helen Zellcombe, dated 19 December 2024. 2 pages, complete.", "Adjustment request record concerning Helen Zellcombe, dated 10 March 2026. 1 page. Signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00155-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Elvham Group", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "6 May 2026"}, "checklist": ["If the applicant has lived at an address outside the country in the last five years, also: criminal record certificate from overseas (issued within the last 3 months)", "If the applicant is applying for a hackney carriage licence rather than private hire, also: vehicle specification sheet for the hackney carriage", "Criminal record check (issued within the last 3 months)", "Right to work share code printout (issued within the last 3 months)", "Licence application form (signed)", "Driver declaration of convictions (signed)"], "submission": {"case": {"name": "Orla Bramwick", "reference": "PX-75567", "details": ["The applicant has lived at the same address in the country for the last five years.", "The applicant is applying for a hackney carriage licence rather than private hire."]}, "documents received": ["Vehicle specification sheet for the hackney carriage - Orla Bramwick. Date of issue: 17 March 2026. 2 pages, complete.", "Licence application form - Orla Bramwick. Date of issue: 24 February 2026. 6 pages, complete. Signed by the applicant.", "Criminal record check - Orla Bramwick. Date of issue: 2 May 2026. 6 pages, complete.", "Driver declaration of convictions - Orla Bramwick. Date of issue: 27 February 2026. Single page. Signed by the driver.", "Right to work share code printout - Orla Bramwick. Date of issue: 5 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide. Review each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Give complete if every applicable line is met (extra documents do not matter). Give incomplete if at least one applicable line is not met. Give unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-25", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 773}} {"id": "isc-te-00223-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Jundbury Limited", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "14 August 2026"}, "checklist": ["Confirm that the pack contains a transfer completion confirmation issued within the last 1 months, signed.", "Confirm that the pack contains an outbound loading record issued within the last 1 months, signed.", "Confirm that the pack contains an inbound unloading record issued within the last 1 months, signed.", "Confirm that the pack contains a damaged goods exception sheet issued within the last 1 months, signed.", "Confirm that the pack contains a seal number log issued within the last 1 months, signed."], "submission": {"case": {"name": "cross-dock transfer HU-37848", "reference": "TS-97557"}, "documents received": ["inbound_unloading_record_HU-37848_5Aug2026.pdf. Inbound unloading record for cross-dock transfer HU-37848, dated 5 August 2026. Single page, signed by the inbound unloading supervisor.", "load_consolidation_sheet_HU-37848_27Jun2026.pdf. Load consolidation sheet for cross-dock transfer HU-37848, dated 27 June 2026. 2 pages, complete; signed by the load consolidation planner.", "transfer_completion_confirmation_HU-37848_6Aug2026_v3.pdf. Transfer completion confirmation for cross-dock transfer HU-37848, dated 6 August 2026. Single page, signed by the transport planning team lead.", "outbound_loading_record_HU-37848_10Aug2026.pdf. Outbound loading record for cross-dock transfer HU-37848, dated 10 August 2026. Single page, signed by the outbound loading supervisor.", "damaged_goods_exception_sheet_HU-37848_25Jul2026.pdf. Damaged goods exception sheet for cross-dock transfer HU-37848, dated 25 July 2026. Single page, signed by the warehouse shift supervisor.", "seal_number_log_HU-37848_12Aug2026.pdf. Seal number log for cross-dock transfer HU-37848, dated 12 August 2026. Single page, signed by the outbound driver."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 931}} {"id": "isc-te-00014-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ambton SAS", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "15 June 2026"}, "checklist": ["Proof of deposit, issued within the last 3 months", "Sale and purchase agreement, signed", "Credit bureau report, issued within the last 1 months", "Property valuation report, issued within the last 6 months and signed", "If the property is being bought from a family member, also: independent purchase price assessment, issued within the last 3 months and signed", "Mortgage application form, signed", "Bank statement, issued within the last 3 months"], "submission": {"case": {"name": "property NI-98706", "reference": "PN-38882"}, "documents received": ["Proof of deposit for property NI-98706. Date of issue: 7 April 2026. 1 page.", "Sale and purchase agreement for property NI-98706. Date of issue: 17 May 2026. 9 pages, complete. Signed by the buyer and the seller.", "Property valuation report for property NI-98706. Date of issue: 12 March 2026. 10 pages, complete. Signed by the valuer.", "Bank statement for property NI-98706. Date of issue: 16 May 2026. 3 pages, complete.", "Credit bureau report for property NI-98706. Date of issue: 5 June 2026. 4 pages, complete.", "Mortgage application form for property NI-98706. Date of issue: 25 April 2026. 6 pages, complete. Signed by the applicant."]}}, "question": {"type": "choice", "instructions": "Your task is to decide whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-40", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 778}} {"id": "isc-te-00324-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Brenmont Partners", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "9 June 2026"}, "checklist": ["Shipping manifest, issued within the last 1 months", "Point of sale design proof, signed", "If the kit includes an electrical display unit, also: electrical safety test certificate, issued within the last 12 months", "Store installation guide", "Kit cost breakdown, issued within the last 3 months and signed", "Waste disposal plan"], "submission": {"case": {"name": "merchandising kit CY-19341", "reference": "ZV-32595", "details": ["The kit includes no electrical display unit."]}, "documents received": ["Waste disposal plan - CY-19341.pdf — A waste disposal plan for merchandising kit CY-19341, dated 11 May 2026. 1 page.", "Store installation guide - CY-19341.pdf — A store installation guide for merchandising kit CY-19341. It is dated 5 April 2026. 6 pages, complete.", "Point of sale design proof - CY-19341.pdf — A point of sale design proof for merchandising kit CY-19341, dated 4 May 2026. 4 pages, complete. It carries a signature from the design studio's lead designer.", "Shipping manifest - CY-19341.pdf — A shipping manifest for merchandising kit CY-19341. It is dated 28 May 2026. 2 pages, complete.", "Kit cost breakdown - CY-19341.pdf — A kit cost breakdown for merchandising kit CY-19341, dated 5 June 2026. 2 pages, complete. It is signed by the retail marketing team's finance contact."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00339-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Pellwood Ltd", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "4 May 2026"}, "checklist": ["Medical examination certificate, issued within the last 6 months and signed.", "Right to work share code printout, issued within the last 3 months.", "Licence application form, signed.", "If the applicant has lived at an address outside the country in the last five years, also: criminal record certificate from overseas, issued within the last 3 months.", "Photo driving licence, valid (not expired) on the date of the review.", "Passport style photograph, issued within the last 6 months."], "submission": {"case": {"name": "Manon Pimingham", "reference": "YV-79327", "details": ["The applicant has lived at an address outside the country in the last five years."]}, "cover note": "Please find attached everything needed for this pack, all complete. Kind regards, Femke Harveau", "documents received": ["Licence application form for Manon Pimingham. Dated 11 January 2026. 6 pages, complete. Signed by the applicant.", "Right to work share code printout for Manon Pimingham. Dated 30 April 2026. Single page.", "Medical examination certificate for Manon Pimingham. Dated 15 December 2025. 2 pages, complete. Signed by the examining doctor.", "Photo driving licence for Manon Pimingham. Expiry date 1 July 2027. 2 pages, complete.", "Passport style photograph for Manon Pimingham. Dated 9 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00402-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Wilmdale Limited", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "14 July 2026"}, "checklist": ["Trade account application form, signed.", "Bank reference letter, issued within the last 6 months, signed.", "Company registration certificate.", "If the customer is a newly incorporated company, also: director identification record, signed.", "Credit reference agency report, issued within the last 3 months.", "Credit limit approval memo, issued within the last 1 months, signed."], "submission": {"case": {"name": "Larvridge Partners", "reference": "JU-12708", "details": ["The customer is not a newly incorporated company."]}, "documents received": ["Credit reference agency report for Larvridge Partners, dated 4 May 2026. 6 pages, complete.", "Trade references letter for Larvridge Partners, dated 6 May 2026. Single page. Signed by the referee company's authorised signatory.", "Bank reference letter for Larvridge Partners, dated 9 May 2026. Single page. Signed by a bank officer.", "Trade account application form for Larvridge Partners, dated 5 April 2026. 3 pages, complete. Signed by the customer's authorised signatory.", "Company registration certificate for Larvridge Partners, dated 27 June 2026. 2 pages, complete.", "Credit limit approval memo for Larvridge Partners. The date of issue is cut off at the top of the page. Single page. Signed by the credit control manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 727}} {"id": "isc-te-00181-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Wynstead Inc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "26 May 2026"}, "checklist": ["Leaver notification form, signed", "Shared mailbox handover record, issued within the last 1 month, signed", "Service desk ticket closure summary, issued within the last 1 month", "Line manager confirmation, issued within the last 1 month, signed", "Final payroll cut-off note, issued within the last 1 month, signed"], "submission": {"case": {"name": "James Fitzford", "reference": "IF-45020"}, "documents received": ["line_manager_confirmation.pdf. This line manager confirmation for James Fitzford is dated 20 May 2026 and is a single page. It is signed by the line manager.", "shared_mailbox_handover_record.pdf. This shared mailbox handover record for James Fitzford is dated 12 May 2026 and runs to 2 pages, complete. It is signed by the shared mailbox owner.", "final_payroll_cutoff_note.pdf. This final payroll cut-off note for James Fitzford is dated 8 May 2026 and is a single page. It is signed by the payroll officer.", "farewell_email_from_colleague.pdf. This email from a colleague wishing James Fitzford well is dated 20 May 2026 and is a single page. It carries the colleague's signature.", "service_desk_ticket_closure_summary.pdf. This service desk ticket closure summary for James Fitzford is dated 13 May 2026 and runs to 3 pages, complete.", "leaver_notification_form.pdf. This leaver notification form for James Fitzford is dated 1 February 2026 and runs to 2 pages, complete. It is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 779}} {"id": "isc-te-00165-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Teskwater Limited", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "3 July 2026"}, "checklist": ["Gateway integration request form, signed", "Test environment transaction log, issued within the last 1 months", "If the gateway will handle recurring subscription payments, also: subscription billing mandate template, signed", "Go-live sign-off certificate, issued within the last 1 months, signed", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review", "Payment gateway technical specification", "Penetration test summary, issued within the last 6 months, signed"], "submission": {"case": {"name": "payment gateway EG-51001", "reference": "MP-69353", "details": ["The gateway will handle recurring subscription payments.", "The gateway will not store customers' card details."]}, "documents received": ["Go-live sign-off certificate for payment gateway EG-51001, dated 14 June 2026. 1 page. It is signed by the Payments Operations Director.", "Subscription billing mandate template for payment gateway EG-51001, dated 4 April 2026. 2 pages, complete. It is signed by the Treasury Manager.", "Gateway integration request form for payment gateway EG-51001, dated 3 April 2026. 2 pages, complete. It is signed by the Head of Payments and IT Security.", "Payment gateway technical specification for payment gateway EG-51001, dated 5 May 2026. 8 pages, complete.", "Test environment transaction log for payment gateway EG-51001, dated 30 June 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 780}} {"id": "isc-te-00245-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Silvik Ltd", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "1 April 2026"}, "checklist": ["Support plan, signed.", "Safeguarding referral form, issued within the last 12 months, signed.", "Benefit entitlement letters, issued within the last 12 months.", "Recent bank statements, issued within the last 3 months.", "Capacity assessment record, signed."], "submission": {"case": {"name": "Anna Holtard", "reference": "TU-70173"}, "documents received": ["Recent bank statements. Recent bank statements for Anna Holtard, dated 27 January 2026. 8 pages, complete.", "Support plan. A support plan for Anna Holtard, dated 21 December 2025. 6 pages, complete. Signed by the lead social worker.", "Benefit entitlement letters. Benefit entitlement letters for Anna Holtard, dated 17 July 2025. 2 pages, complete.", "Safeguarding referral form. A safeguarding referral form for Anna Holtard, dated 29 September 2025. 2 pages, complete. Signed by the safeguarding officer.", "Capacity assessment record. A capacity assessment record for Anna Holtard, dated 7 March 2026. 4 pages, complete. Signed by the approved mental capacity assessor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 690}} {"id": "isc-te-00112-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lunhall Ltd", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "2 July 2026"}, "checklist": ["If the move includes taking furniture to a storage unit, also: storage unit access authorisation (signed)", "lifting equipment inspection report (issued within the last 6 months, signed)", "IT decommissioning certificate (issued within the last 1 months, signed)", "new floor snagging list (issued within the last 1 months, signed)", "movers insurance certificate (valid (not expired) on the date of the review)", "signed move plan (signed)", "crate hire agreement (signed)"], "submission": {"case": {"name": "office move project VB-98815", "reference": "KT-58591", "details": ["The move includes taking furniture to a storage unit."]}, "documents received": ["KT-58591 Signed move plan VB-98815.pdf. This is a signed move plan for office move project VB-98815, dated 11 June 2026. 6 pages, complete. It has been signed by the project manager.", "KT-58591 Lifting equipment inspection report VB-98815.pdf. This is a lifting equipment inspection report for office move project VB-98815, dated 16 February 2026. 2 pages, complete. It has been signed by the lifting equipment inspector.", "KT-58591 IT decommissioning certificate VB-98815.pdf. This is a one-page IT decommissioning certificate for office move project VB-98815, dated 16 June 2026. It has been signed by the IT manager.", "KT-58591 Storage unit access authorisation VB-98815.pdf. This is a one-page storage unit access authorisation for office move project VB-98815, dated 4 June 2026. It has been signed by the facilities manager.", "KT-58591 Crate hire agreement VB-98815.pdf. This is a crate hire agreement for office move project VB-98815, dated 9 June 2026. 2 pages, complete. It has been signed by the supplier's representative.", "KT-58591 Parking bay suspension approval VB-98815.pdf. This is a one-page parking bay suspension approval for office move project VB-98815, dated 18 June 2026. It has been signed by the local authority parking officer.", "KT-58591 Movers insurance certificate VB-98815.pdf. This is a one-page movers insurance certificate for office move project VB-98815. It shows an expiry date of 20 May 2027.", "KT-58591 New floor snagging list VB-98815.pdf. This is a new floor snagging list for office move project VB-98815, 3 pages, complete. Its date of issue cannot be made out, as it is covered by a stamp. It has been signed by the site manager."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete when checked against the checklist. Consider every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete: every applicable line is met (extra documents do not matter). Return incomplete: at least one applicable line is not met. Return unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-18", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1115}} {"id": "isc-te-00038-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Lunwyn Partners", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "8 April 2026"}, "checklist": ["Confirm the cure period expiry calculation is included, that it was issued within the last 1 months, and that it is signed.", "Confirm the termination notice draft is included and that it is signed.", "If the contract requires a dispute to go to mediation first, also: confirm the mediation request confirmation is included, that it was issued within the last 1 months, and that it is signed.", "Confirm the original service agreement copy is included.", "Confirm the breach evidence log is included, that it was issued within the last 1 months, and that it is signed."], "submission": {"case": {"name": "Tarvcombe & Co", "reference": "BI-47555", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Cure period expiry calculation for Tarvcombe & Co, dated 4 April 2026, 2 pages, complete. Signed by the contract manager.", "Litigation hold notice for Tarvcombe & Co, dated 2 April 2026, 2 pages, complete. Signed by the legal counsel.", "Breach evidence log for Tarvcombe & Co, dated 23 March 2026, 6 pages, complete. Signed by the disputes case handler.", "Termination notice draft for Tarvcombe & Co, dated 25 January 2026, 2 pages, complete. Signed by the commercial director.", "Original service agreement copy for Tarvcombe & Co, dated 24 December 2025, 10 pages, complete.", "Mediation request confirmation for Tarvcombe & Co, dated 23 March 2026, single page. Signed by the mediation case officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 784}} {"id": "isc-te-00228-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lindcourt & Co", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "15 May 2026"}, "checklist": ["Training matrix extract, issued within the last 3 months, signed.", "Calibration status summary, issued within the last 1 months, signed.", "Layout tour plan, signed.", "Audit scope statement, signed.", "Audit agenda, signed.", "Document control list, issued within the last 3 months, signed."], "submission": {"case": {"name": "customer audit visit HY-50028", "reference": "PO-24718"}, "documents received": ["HY-50028_audit_scope_statement.pdf. Audit scope statement for customer audit visit HY-50028, dated 7 March 2026. Single page, with a signature from the Quality Manager.", "HY-50028_document_control_list.pdf. Document control list for customer audit visit HY-50028, dated 20 March 2026. 4 pages, complete, with a signature from the Document Control Officer.", "HY-50028_layout_tour_plan.pdf. Layout tour plan for customer audit visit HY-50028, dated 8 February 2026. Single page, with a signature from the Facilities Supervisor.", "HY-50028_previous_audit_findings_closure_file.pdf. Previous audit findings closure file for customer audit visit HY-50028, dated 25 January 2026. 6 pages, complete, with a signature from the Quality Manager.", "HY-50028_calibration_status_summary.pdf. Calibration status summary for customer audit visit HY-50028, dated 5 May 2026. 2 pages, complete, with a signature from the Quality Manager.", "HY-50028_training_matrix_extract.pdf. Training matrix extract for customer audit visit HY-50028, dated 12 May 2026. 3 pages, complete, with a signature from the Training Coordinator.", "HY-50028_audit_agenda.pdf. Audit agenda for customer audit visit HY-50028, dated 28 March 2026. Single page, with a signature from the Quality Manager."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete when measured against the checklist. Go over every checklist line relevant to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, contain all its pages, carry a signature wherever the checklist asks for one, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': all applicable lines are met (extra documents do not matter). 'incomplete': at least one applicable line is unmet. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-45", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 903}} {"id": "isc-te-00359-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Ilvbrook Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "17 July 2026"}, "checklist": ["Hotel availability printout, issued within the last 1 month and signed", "Package holiday brochure page", "If the booking includes a car hire, also: car hire quotation, issued within the last 1 month", "Passport details form, signed", "Flight availability printout, issued within the last 1 month", "Travel insurance quote, issued within the last 1 month", "Booking request form, signed"], "submission": {"case": {"name": "holiday booking FU-13646", "reference": "DM-77175", "details": ["The booking does not include a car hire."]}, "documents received": ["Booking request form for holiday booking FU-13646, dated 3 July 2026. 2 pages, complete. Signed by the reservations clerk.", "Travel insurance quote for holiday booking FU-13646, dated 5 July 2026. 2 pages, complete.", "Package holiday brochure page for holiday booking FU-13646, dated 29 April 2026. Single page.", "Hotel availability printout for holiday booking FU-13646, dated 28 June 2026. 2 pages, complete. Signed by the reservations manager.", "Passport details form for holiday booking FU-13646, dated 24 April 2026. Single page. Signed by the customer.", "Flight availability printout for holiday booking FU-13646, dated 10 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 761}} {"id": "isc-te-00490-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravness Group", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "14 July 2026"}, "checklist": ["Fire safety certificate: valid (not expired) on the date of the review", "Floor load capacity report: signed", "Utilities connection certificate", "Signed lease agreement: signed"], "submission": {"case": {"name": "warehouse MI-17904", "reference": "DQ-47245"}, "documents received": ["signed_lease_agreement_MI-17904.pdf — Signed lease agreement for warehouse MI-17904. Date of issue: 14 June 2026. 8 pages, complete. Signed by the landlord and the tenant.", "utilities_connection_certificate_MI-17904.pdf — Utilities connection certificate for warehouse MI-17904. Date of issue: 2 May 2026. Single page.", "floor_load_capacity_report_MI-17904.pdf — Floor load capacity report for warehouse MI-17904. Date of issue: 18 April 2026. 3 pages, complete. Signed by the structural engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 642}} {"id": "isc-te-00038-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Lunwyn Partners", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "8 April 2026"}, "checklist": ["Confirm the cure period expiry calculation is included, that it was issued within the last 1 months, and that it is signed.", "Confirm the termination notice draft is included and that it is signed.", "If the contract requires a dispute to go to mediation first, also: confirm the mediation request confirmation is included, that it was issued within the last 1 months, and that it is signed.", "Confirm the original service agreement copy is included.", "Confirm the breach evidence log is included, that it was issued within the last 1 months, and that it is signed."], "submission": {"case": {"name": "Tarvcombe & Co", "reference": "BI-47555", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Mediation request confirmation for Tarvcombe & Co, dated 23 March 2026, single page. Signed by the mediation case officer.", "Original service agreement copy for Tarvcombe & Co, dated 24 December 2025, 10 pages, complete.", "Breach evidence log for Tarvcombe & Co, dated 23 March 2026, 6 pages, complete. Signed by the disputes case handler.", "Termination notice draft for Tarvcombe & Co, dated 25 January 2026, 2 pages, complete. Signed by the commercial director.", "Cure period expiry calculation for Tarvcombe & Co, dated 4 April 2026, 2 pages, complete. Signed by the contract manager."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and say whether it is complete. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-47", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00320-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Hondwick plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "9 September 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "If the account will be run by an external agency, also: agency access agreement (signed)", "Account request form (signed)", "Account purpose statement", "Naming convention approval (signed)", "Platform terms acceptance record (signed)"], "submission": {"case": {"name": "new social media account ZP-18379", "reference": "MR-88769", "details": ["The account will be run by an external agency."]}, "cover note": "I'm sorry that this pack was put together in a rush. Please let me know if anything needs clarifying and I'll respond as quickly as I can.", "documents received": ["Naming convention approval - ZP-18379.pdf. A naming convention approval for new social media account ZP-18379, dated 5 August 2026, on a single page. It is signed by the social media governance lead.", "Account purpose statement - ZP-18379.pdf. An account purpose statement for new social media account ZP-18379, dated 14 July 2026. It is a single page.", "Agency access agreement - ZP-18379.pdf. An agency access agreement for new social media account ZP-18379, dated 15 August 2026. 2 pages, complete. It is signed by the agency's account director.", "Account request form - ZP-18379.pdf. An account request form for new social media account ZP-18379, dated 23 June 2026, on a single page. It is signed by the requesting marketing manager.", "Platform terms acceptance record - ZP-18379.pdf. A platform terms acceptance record for new social media account ZP-18379, dated 24 August 2026, on a single page. It is signed by the account administrator.", "Admin access list - ZP-18379.pdf. An admin access list for new social media account ZP-18379, dated 14 August 2026. It is a single page.", "Account closure procedure - ZP-18379.pdf. An account closure procedure for new social media account ZP-18379, dated 1 August 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 953}} {"id": "isc-te-00216-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Boltlund SAS", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "7 September 2026"}, "checklist": ["Asbestos survey report, issued within the last 12 months.", "Energy performance certificate, valid (not expired) on the date of the review.", "Signed stamp duty return.", "Guarantor consent letter, signed."], "submission": {"case": {"name": "premises KD-67988", "reference": "ID-68027"}, "documents received": ["Letter_of_Support_KD-67988_24Aug2026.pdf. Letter of support for premises KD-67988, dated 24 August 2026. 1 page. Signed by the parent company's authorised signatory. It contains no guarantee wording.", "Asbestos_Survey_Report_KD-67988_22Aug2026.pdf. Asbestos survey report for premises KD-67988, dated 22 August 2026. 4 pages, complete.", "Stamp_Duty_Return_KD-67988_29Jul2026.pdf. Stamp duty return for premises KD-67988, dated 29 July 2026. 2 pages, complete. Signed by the tenant's finance director.", "EPC_KD-67988.pdf. Energy performance certificate for premises KD-67988, expiring 23 April 2027. 1 page.", "Company_Search_Report_KD-67988_03Sep2026.pdf. Company search report for premises KD-67988, dated 3 September 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 775}} {"id": "isc-te-00105-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Oskcliff BV", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "16 April 2026"}, "checklist": ["Fraud screening result sheet issued within the last 3 months.", "Signature proof of delivery issued within the last 6 months and signed.", "Delivery confirmation issued within the last 6 months.", "Transaction record printout issued within the last 3 months.", "Chargeback response form, signed.", "Customer account details page issued within the last 3 months."], "submission": {"case": {"name": "disputed transaction EQ-46342", "reference": "VR-66300"}, "documents received": ["Signature proof of delivery - EQ-46342.pdf. A one-page signature proof of delivery for disputed transaction EQ-46342, showing its date of issue as 12 January 2026. It is signed by the delivery driver.", "Transaction record printout - EQ-46342.pdf. A single-page transaction record printout for disputed transaction EQ-46342, issued on 26 March 2026.", "Chargeback response form - EQ-46342.pdf. A chargeback response form for disputed transaction EQ-46342, dated 14 January 2026. It runs to 2 pages, complete, and is signed by the payments disputes team lead.", "Delivery confirmation - EQ-46342.pdf. A one-page delivery confirmation for disputed transaction EQ-46342, showing its date of issue as 29 November 2025.", "Fraud screening result sheet - EQ-46342.pdf. A single-page fraud screening result sheet for disputed transaction EQ-46342, dated 14 February 2026.", "Customer account details page - EQ-46342.pdf. A one-page customer account details page for disputed transaction EQ-46342, with its date of issue shown as 4 April 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 830}} {"id": "isc-te-00469-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Faldwater Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "25 May 2026"}, "checklist": ["Confirm the pack contains a prerequisite certificate.", "Confirm the pack contains a signed course booking form.", "If the course leads to a licensed qualification, also confirm the pack contains a signed licence eligibility declaration.", "Confirm the pack contains a signed cancellation policy acceptance.", "Confirm the pack contains a special requirements note.", "Confirm the pack contains an employer sponsorship letter issued within the last 3 months and signed.", "Confirm the pack contains a payment confirmation issued within the last 3 months."], "submission": {"case": {"name": "course booking WV-19849", "reference": "FX-94940"}, "documents received": ["Special requirements note for course booking WV-19849. Date of issue: 18 April 2026. 1 page.", "Licence eligibility declaration for course booking WV-19849. Date of issue: 23 April 2026. 1 page. Signed by the delegate.", "Delegate photo identification for course booking WV-19849. Expiry date: 2 November 2027. 1 page.", "Prerequisite certificate for course booking WV-19849. Date of issue: 28 April 2026. 1 page.", "Cancellation policy acceptance for course booking WV-19849. Date of issue: 2 March 2026. 1 page. Signed by the delegate.", "Course booking form for course booking WV-19849. Date of issue: 5 April 2026. 2 pages, complete. Signed by the delegate.", "Payment confirmation for course booking WV-19849. Date of issue: 7 March 2026. 1 page.", "Employer sponsorship letter for course booking WV-19849. Date of issue: 6 May 2026. 1 page. Signed by the employer's sponsoring manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00046-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Zaldhurst Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "1 June 2026"}, "checklist": ["Financial stability statement, issued within the last 12 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed.", "Supplier self-assessment report, issued within the last 12 months and signed.", "Certified quality management system certificate, valid (not expired) on the date of the review.", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months and signed."], "submission": {"case": {"name": "Eskvale plc", "reference": "VY-19567", "details": ["The supplier subcontracts part of the production."]}, "documents received": ["Eskvale_plc_subcontractor_approval_record_7October2025.pdf — Subcontractor approval record for Eskvale plc, dated 7 October 2025. 2 pages, complete. Signed by the purchasing manager of Eskvale plc.", "Eskvale_plc_financial_stability_statement_23March2026.pdf — Financial stability statement for Eskvale plc, dated 23 March 2026. 2 pages, complete. Signed by the finance director of Eskvale plc.", "Eskvale_plc_supplier_self_assessment_report_14May2026.pdf — Supplier self-assessment report for Eskvale plc, dated 14 May 2026. 6 pages, complete. Signed by the quality manager of Eskvale plc.", "Eskvale_plc_raw_material_certificate_of_analysis_12January2026.pdf — Raw material certificate of analysis for Eskvale plc, dated 12 January 2026. 2 pages, complete. Signed by the laboratory manager of Eskvale plc.", "Eskvale_plc_certified_QMS_certificate_29October2027.pdf — Certified quality management system certificate for Eskvale plc, showing an expiry date of 29 October 2027. Single page.", "Eskvale_plc_supplier_quality_questionnaire_13April2026.pdf — Supplier quality questionnaire for Eskvale plc, dated 13 April 2026. 4 pages, complete. Signed by the quality manager of Eskvale plc.", "Eskvale_plc_customer_reference_letter_14May2026.pdf — Customer reference letter from another buyer regarding Eskvale plc, dated 14 May 2026. 6 pages, complete. Signed by the purchasing manager of the buyer who issued the letter."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 955}} {"id": "isc-te-00018-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silthorpe Group", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "15 April 2026"}, "checklist": ["Customer account details page, issued within the last 3 months", "Terms of sale acceptance log, issued within the last 12 months", "Customer order history extract, issued within the last 6 months", "Transaction record printout, issued within the last 3 months", "Fraud screening result sheet, issued within the last 3 months", "Chargeback response form, signed"], "submission": {"case": {"name": "disputed transaction NP-25742", "reference": "HU-11985"}, "documents received": ["Scanned chargeback response form for disputed transaction NP-25742, dated 9 April 2026. 2 pages, complete. Signed by the payments disputes team supervisor.", "Scanned customer order history extract for disputed transaction NP-25742, dated 21 January 2026. 2 pages, complete.", "Scanned transaction record printout for disputed transaction NP-25742, dated 13 February 2026. 1 page.", "Scanned fraud screening result sheet for disputed transaction NP-25742, dated 9 April 2026. 1 page.", "Scanned terms of sale acceptance log for disputed transaction NP-25742, dated 29 March 2026. 1 page.", "Scanned customer account details page for disputed transaction NP-25742, dated 17 February 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 743}} {"id": "isc-te-00340-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Eskness Limited", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "25 March 2026"}, "checklist": ["Training needs assessment (signed)", "Vendor quotation (issued within the last 3 months)", "Equipment purchase request form (signed)", "Three quotes comparison sheet (issued within the last 3 months, signed)", "Cost-benefit justification"], "submission": {"case": {"name": "equipment NP-85998", "reference": "KG-36968"}, "documents received": ["Equipment purchase request form - NP-85998.pdf - Equipment purchase request form for equipment NP-85998, dated 19 March 2026. 2 pages, complete. Signed by the requesting department manager.", "Maintenance plan - NP-85998.pdf - Maintenance plan for equipment NP-85998, dated 21 December 2025. 2 pages, complete.", "Vendor quotation - NP-85998.pdf - Vendor quotation for equipment NP-85998, dated 8 February 2026. 2 pages, complete.", "Cost-benefit justification - NP-85998.pdf - Cost-benefit justification for equipment NP-85998, dated 13 March 2026. 3 pages, complete.", "Three quotes comparison sheet - NP-85998.pdf - Three quotes comparison sheet for equipment NP-85998, dated 11 March 2026. 1 page. Signed by the procurement lead."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Go through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-49", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 739}} {"id": "isc-te-00325-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Cresklund BV", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "30 March 2026"}, "checklist": ["Obtain the bank interest statement, issued within the last 13 months.", "If the household sold a property other than its main home during the tax year, also obtain the property disposal calculation sheet, signed.", "Obtain the pension contribution certificate, issued within the last 13 months.", "Obtain the capital gains asset record.", "Obtain the rental income record.", "Obtain the childcare payment receipt, issued within the last 13 months.", "If one household member worked abroad for part of the year, also obtain the foreign earnings statement, issued within the last 13 months.", "Obtain the employment income summary, issued within the last 13 months."], "submission": {"case": {"name": "household tax affairs VX-14371", "reference": "GX-21410", "details": ["The household sold a property other than its main home during the tax year.", "One household member worked abroad for part of the year."]}, "cover note": "I am sorry this pack was put together in a rush.", "documents received": ["Bank interest statement covering household tax affairs VX-14371, dated 26 May 2025. 3 pages, complete.", "Property disposal calculation sheet for household tax affairs VX-14371, dated 27 February 2026. 2 pages, complete. Signed by the household's own tax filer.", "Foreign earnings statement for household tax affairs VX-14371, dated 27 July 2025. 2 pages, complete.", "Rental income record for household tax affairs VX-14371, dated 3 February 2026. 4 pages, complete.", "Childcare payment receipt for household tax affairs VX-14371, dated 26 September 2025. 1 page.", "Capital gains asset record for household tax affairs VX-14371, dated 28 January 2026. 2 pages, complete.", "Employment income summary for household tax affairs VX-14371, dated 19 November 2025. 2 pages, complete.", "Pension contribution certificate for household tax affairs VX-14371, dated 6 December 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; base your judgement on the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "variant-42", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 933}} {"id": "isc-te-00343-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Ebrton & Co", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "17 March 2026"}, "checklist": ["Check that the radiation safety training certificate is included, that it was issued within the last 24 months and that it is signed.", "Check that the insurance declaration for facility work is included, that it was issued within the last 12 months and that it is signed.", "Check that the photo identity document is included and that it is valid, meaning not expired, on the date of the review.", "Check that the beam time or instrument booking confirmation is included.", "Check that the experiment safety clearance form is included and that it is signed."], "submission": {"case": {"name": "Elif Aldmore", "reference": "NP-73151"}, "documents received": ["d8_experiment_safety_clearance_form_signed_elif_aldmore.pdf. Experiment safety clearance form for Elif Aldmore, issued on 15 January 2026. All 3 pages are included, and the form is signed by the experiment safety officer.", "d2_insurance_declaration_facility_work_elif_aldmore.pdf. Insurance declaration for facility work for Elif Aldmore, issued on 18 December 2025. It is a single page and is signed by the insurance provider's authorised representative.", "d3_photo_identity_document_elif_aldmore.pdf. Photo identity document for Elif Aldmore, with an expiry date of 10 February 2028. It is a single page.", "d1_radiation_safety_training_certificate_elif_aldmore.pdf. Radiation safety training certificate for Elif Aldmore, issued on 7 April 2024. It is a single page and is signed by the radiation safety training officer.", "d7_host_scientist_invitation_letter_elif_aldmore.pdf. Host scientist invitation letter for Elif Aldmore, issued on 18 January 2026. It is a single page and is signed by the host scientist.", "d4_beam_time_booking_confirmation_elif_aldmore.pdf. Beam time or instrument booking confirmation for Elif Aldmore, issued on 23 December 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 869}} {"id": "isc-te-00167-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Orrwell Limited", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "14 April 2026"}, "checklist": ["Identity verification document (valid, not expired, on the date of the review)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Marketing consent form (signed)", "Customer contact details sheet (signed)", "Initial points balance statement (issued within the last 3 months)", "Loyalty scheme enrolment form (signed)"], "submission": {"case": {"name": "Brooke Ullstad", "reference": "VX-71748", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Marketing consent form VX-71748_d2.pdf. A one-page marketing consent form for Brooke Ullstad, dated 20 February 2026. The form is signed by the customer.", "Identity verification document VX-71748_d1.pdf. A one-page identity verification document for Brooke Ullstad. The date on the document is not visible, as it is covered by an ink stamp.", "Terms and conditions acceptance sheet VX-71748_d8.pdf. A one-page terms and conditions acceptance sheet for Brooke Ullstad, dated 2 February 2026. The sheet is signed by the customer.", "Customer contact details sheet VX-71748_d3.pdf. A one-page customer contact details sheet for Brooke Ullstad, dated 29 March 2026. The sheet is signed by the customer.", "Initial points balance statement VX-71748_d4.pdf. A one-page initial points balance statement for Brooke Ullstad, dated 10 March 2026.", "Loyalty scheme enrolment form VX-71748_d5.pdf. A one-page loyalty scheme enrolment form for Brooke Ullstad, dated 8 January 2026. The form is signed by the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 832}} {"id": "isc-te-00153-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jorwell Partners", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "22 May 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Travel request form (signed)", "Passport copy for international travel (valid (not expired) on the date of the review)", "Flight itinerary quote (issued within the last 1 months)", "Visa entry requirement printout (issued within the last 3 months)", "Trip cost estimate (signed)", "Travel policy acknowledgement (signed)"], "submission": {"case": {"name": "business trip SC-57627", "reference": "VR-75039", "details": ["The traveller is not a passport holder of the destination country."]}, "documents received": ["Line manager approval for business trip SC-57627. Dated 2 May 2026. Single page. Signed by the line manager.", "Trip cost estimate for business trip SC-57627. Dated 10 April 2026. Single page. Signed by the line manager.", "Passport copy for international travel for business trip SC-57627. Passport expiry date: 22 November 2027. Single page.", "Work permit confirmation for business trip SC-57627. Dated 30 April 2026. 2 pages, complete.", "Travel request form for business trip SC-57627. Dated 3 April 2026. 2 pages, complete. Signed by the traveller.", "Flight itinerary quote for business trip SC-57627. Dated 18 May 2026. 2 pages, complete.", "Travel policy acknowledgement for business trip SC-57627. Dated 2 February 2026. Single page. Signed by the traveller.", "Visa entry requirement printout for business trip SC-57627. Dated 15 May 2026. 2 pages, complete.", "Hotel booking confirmation for business trip SC-57627. Dated 30 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 872}} {"id": "isc-te-00005-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ulmmoor LLP", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "6 May 2026"}, "checklist": ["Costed trip estimate sheet, issued within the last 3 months and signed", "Outstanding advance clearance check, signed", "Travel policy extract showing advance eligibility", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Marco Mundridge", "reference": "RH-30807"}, "documents received": ["Payroll Deduction Agreement for Recovery of the Advance. This single-page payroll deduction agreement covering recovery of the advance for Marco Mundridge is dated 20 April 2026 and bears the employee's signature.", "Scan_004. The scan in this file is too faint to read, so nothing on the page can be made out.", "Travel Policy Extract. This single-page travel policy extract showing advance eligibility for Marco Mundridge is dated 26 January 2026.", "Outstanding Advance Clearance Check. This single-page outstanding advance clearance check for Marco Mundridge is dated 13 April 2026 and is signed by the accounts payable reviewer.", "Costed Trip Estimate Sheet. This single-page costed trip estimate sheet for Marco Mundridge is dated 23 March 2026 and carries the signature of the estimating clerk who prepared it."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 676}} {"id": "isc-te-00320-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Hondwick plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "9 September 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "If the account will be run by an external agency, also: agency access agreement (signed)", "Account request form (signed)", "Account purpose statement", "Naming convention approval (signed)", "Platform terms acceptance record (signed)"], "submission": {"case": {"name": "new social media account ZP-18379", "reference": "MR-88769", "details": ["The account will be run by an external agency."]}, "documents received": ["Platform terms acceptance record - ZP-18379.pdf. A platform terms acceptance record for new social media account ZP-18379, dated 24 August 2026, on a single page. It is signed by the account administrator.", "Account purpose statement - ZP-18379.pdf. An account purpose statement for new social media account ZP-18379, dated 14 July 2026. It is a single page.", "Naming convention approval - ZP-18379.pdf. A naming convention approval for new social media account ZP-18379, dated 5 August 2026, on a single page. It is signed by the social media governance lead.", "Account request form - ZP-18379.pdf. An account request form for new social media account ZP-18379, dated 23 June 2026, on a single page. It is signed by the requesting marketing manager.", "Admin access list - ZP-18379.pdf. An admin access list for new social media account ZP-18379, dated 14 August 2026. It is a single page.", "Agency access agreement - ZP-18379.pdf. An agency access agreement for new social media account ZP-18379, dated 15 August 2026. 2 pages, complete. It is signed by the agency's account director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 867}} {"id": "isc-te-00167-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Orrwell Limited", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "14 April 2026"}, "checklist": ["Identity verification document (valid, not expired, on the date of the review)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Marketing consent form (signed)", "Customer contact details sheet (signed)", "Initial points balance statement (issued within the last 3 months)", "Loyalty scheme enrolment form (signed)"], "submission": {"case": {"name": "Brooke Ullstad", "reference": "VX-71748", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Marketing consent form VX-71748_d2.pdf. A one-page marketing consent form for Brooke Ullstad, dated 20 February 2026. The form is signed by the customer.", "Customer contact details sheet VX-71748_d3.pdf. A one-page customer contact details sheet for Brooke Ullstad, dated 29 March 2026. The sheet is signed by the customer.", "Identity verification document VX-71748_d1.pdf. A one-page identity verification document for Brooke Ullstad. The date on the document is not visible, as it is covered by an ink stamp.", "Nominated store preference form VX-71748_d6.pdf. A one-page nominated store preference form for Brooke Ullstad, dated 18 February 2026. The form is signed by the customer.", "Loyalty scheme enrolment form VX-71748_d5.pdf. A one-page loyalty scheme enrolment form for Brooke Ullstad, dated 8 January 2026. The form is signed by the customer.", "Initial points balance statement VX-71748_d4.pdf. A one-page initial points balance statement for Brooke Ullstad, dated 10 March 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 832}} {"id": "isc-te-00194-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Tarvston Limited", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "16 September 2026"}, "checklist": ["Signature verification record: confirm it is present and signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form: confirm it is present and signed", "Photo identification: confirm it is valid (not expired) on the date of the review", "Delivery address confirmation: confirm it is present and signed", "Card replacement request form: confirm it is present and signed", "Fraud questionnaire: confirm it is present and signed", "Account statement showing recent activity: confirm it was issued within the last 1 months"], "submission": {"case": {"name": "Daan Jessova", "reference": "KM-50187", "details": ["The cardholder is at their home address."]}, "documents received": ["card_replacement_request_form.pdf - Card replacement request form for Daan Jessova, dated 11 July 2026. 2 pages, complete. Signed by the cardholder.", "delivery_address_confirmation.pdf - Delivery address confirmation for Daan Jessova, dated 8 June 2026. 1 page. Signed by the cardholder.", "fraud_questionnaire.pdf - Card replacement fraud questionnaire for Daan Jessova, dated 10 August 2026. 2 pages, complete. Signed by the cardholder.", "photo_identification.pdf - Photo identification for Daan Jessova, showing an expiry date of 25 April 2028. 1 page.", "signature_verification_record.pdf - Signature verification record for Daan Jessova, dated 18 August 2026. 1 page. Signed by a card services officer.", "account_statement_recent_activity.pdf - Account statement showing recent activity for Daan Jessova, dated 1 September 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00239-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Pentlund Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "29 May 2026"}, "checklist": ["If the borrower is self-employed, also: two most recent tax year overviews (issued within the last 18 months, signed)", "P60 tax summary (issued within the last 15 months)", "gifted deposit letter (issued within the last 3 months, signed)", "three months of bank statements (issued within the last 3 months)", "mortgage application form (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Edward Gillnall", "reference": "JK-76860"}, "documents received": ["Two most recent tax year overviews for Edward Gillnall. Date of issue: 30 September 2025. 4 pages, complete, signed by the borrower.", "Gifted deposit letter for Edward Gillnall. Date of issue: 7 April 2026. Single page, signed by the donor.", "Mortgage application form for Edward Gillnall. Date of issue: 8 April 2026. 10 pages, complete, signed by the borrower.", "Three months of bank statements for Edward Gillnall. Date of issue: 15 April 2026. 9 pages, complete.", "Proof of deposit savings for Edward Gillnall. Date of issue: 13 April 2026. 2 pages, complete.", "P60 tax summary for Edward Gillnall. Date of issue: 5 August 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 741}} {"id": "isc-te-00102-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Elvcrest Ltd", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "7 May 2026"}, "checklist": ["Proof of registered office address, issued within the last 3 months", "Authorised signer identity document, valid (not expired) on the date of the review", "Board resolution to open the account, signed", "Beneficial owner identification form, signed", "Company tax registration certificate", "Certificate of incorporation"], "submission": {"case": {"name": "Pentlund GmbH", "reference": "WW-71385"}, "documents received": ["Company tax registration certificate for Pentlund GmbH. Date of issue: 29 April 2026. Single page.", "Proof of registered office address for Pentlund GmbH. Date of issue: 25 March 2026. Single page.", "Board resolution to open the account for Pentlund GmbH. Date of issue: 6 February 2026. Signed by the chair of the board. Single page.", "Beneficial owner identification form for Pentlund GmbH. Date of issue: 17 January 2026. 3 pages, complete. Signed by the authorised signer.", "Authorised signer identity document for Pentlund GmbH. Expiry date: 31 March 2026. Single page.", "Certificate of incorporation for Pentlund GmbH. Date of issue: 2 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "expired before the review", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 692}} {"id": "isc-te-00303-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Fravfell Partners", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "22 April 2026"}, "checklist": ["Staff training record for the duty manager, issued within the last 24 months and signed", "CCTV footage stills of the incident, issued within the last 3 months", "Incident report from the day, issued within the last 3 months and signed", "Cleaning log for the day of the incident, issued within the last 6 months and signed", "Witness statement from a staff member, signed"], "submission": {"case": {"name": "Dornmere LLP", "reference": "YX-91405"}, "cover note": "This pack was already checked by a colleague before it came to you.", "documents received": ["Incident report from the day, Dornmere LLP, dated 11 February 2026. 2 pages, complete. Signed by the duty manager.", "Photographs of the spillage on the floor, Dornmere LLP, dated 9 April 2026. 1 page.", "Cleaning log for the day of the incident, Dornmere LLP, dated 24 January 2026. 1 page. A sticky note covers the signature block, so it cannot be seen whether the log is signed.", "Staff training record for the duty manager, Dornmere LLP, dated 2 May 2025. 2 pages, complete. Signed by the duty manager.", "Public liability insurance schedule, Dornmere LLP, dated 15 January 2026. 4 pages, complete.", "Witness statement from a staff member, Dornmere LLP, dated 11 April 2026. 1 page. Signed by the staff member who wrote it.", "CCTV footage stills of the incident, Dornmere LLP, dated 23 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00491-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Elvburg Partners", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "2 September 2026"}, "checklist": ["Damaged goods exception sheet issued within the last 1 months and signed", "Transfer completion confirmation issued within the last 1 months and signed", "Cross-dock slot booking sheet issued within the last 1 months and signed", "Seal number log issued within the last 1 months and signed", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet issued within the last 1 months and signed", "Transfer manifest signed"], "submission": {"case": {"name": "cross-dock transfer AW-98841", "reference": "LJ-77614", "details": ["The transfer includes no temperature-controlled load."]}, "documents received": ["Damaged goods exception sheet for cross-dock transfer AW-98841, dated 24 August 2026. Single page, signed by the warehouse supervisor.", "Cross-dock slot booking sheet for cross-dock transfer AW-98841, dated 23 August 2026. Single page, signed by the dock scheduler.", "Transfer manifest for cross-dock transfer AW-98841, dated 25 May 2026. 3 pages, complete, signed by the transport planner.", "Transfer completion confirmation for cross-dock transfer AW-98841, dated 28 August 2026. Single page, signed by the transport coordinator.", "File scan_048.pdf. The file will not open, so its contents cannot be seen.", "Seal number log for cross-dock transfer AW-98841, dated 31 August 2026. Single page, signed by the loading bay operative.", "Printed-out text message from the driver for cross-dock transfer AW-98841, dated 28 August 2026. Single page, signed by the driver.", "Outbound loading record for cross-dock transfer AW-98841, dated 22 August 2026. Single page, signed by the loading team leader."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 860}} {"id": "isc-te-00278-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Wendwyn Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "7 September 2026"}, "checklist": ["Sales invoice or receipt for the sale proceeds, issued within the last 3 months.", "Signed asset disposal request form.", "Signed board or budget holder approval for the disposal.", "Signed asset de-registration and tag removal record."], "submission": {"case": {"name": "disposed asset FF-78187", "reference": "WP-26906"}, "cover note": "A colleague has already been through this pack, so it should be ready for your review.", "documents received": ["Asset de-registration and tag removal record - FF-78187 - 12 August 2026. A single-page asset de-registration and tag removal record for disposed asset FF-78187, dated 12 August 2026. The signature line is empty, so the record is not signed.", "Board or budget holder approval for the disposal - FF-78187 - 17 May 2026. A single-page board or budget holder approval for the disposal of asset FF-78187, dated 17 May 2026, signed by a director on behalf of the board.", "Asset disposal request form - FF-78187 - 22 July 2026. 2 pages, complete. The asset disposal request form for disposed asset FF-78187, dated 22 July 2026, signed by the requesting budget holder.", "Sales invoice for sale proceeds - FF-78187 - 27 July 2026. A single-page sales invoice or receipt for the sale proceeds relating to disposed asset FF-78187, dated 27 July 2026.", "Depreciation schedule for the asset to date - FF-78187 - 29 August 2026. 2 pages, complete. The depreciation schedule for the asset to date for disposed asset FF-78187, dated 29 August 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 853}} {"id": "isc-te-00169-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Vornmere Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "10 June 2026"}, "checklist": ["Loyalty scheme enrolment form (signed)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Nominated store preference form (signed)", "Initial points balance statement (issued within the last 3 months)", "Terms and conditions acceptance sheet (signed)"], "submission": {"case": {"name": "Emily Kipaker", "reference": "LI-14145", "details": ["The customer is joining as a single-person account."]}, "cover note": "I am sorry that this pack was put together in a rush. It is with you now for the review on 10 June 2026.", "documents received": ["Terms and conditions acceptance sheet for Emily Kipaker, dated 1 March 2026. A single page, signed by the member, Emily Kipaker.", "Initial points balance statement for Emily Kipaker, dated 6 April 2026. A single page.", "Points transfer request for Emily Kipaker, dated 22 March 2026. A single page, signed by the member, Emily Kipaker.", "Nominated store preference form for Emily Kipaker, dated 19 May 2026. A single page, signed by the member, Emily Kipaker.", "Loyalty scheme enrolment form for Emily Kipaker, dated 29 May 2026. A single page, signed by the member, Emily Kipaker."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 746}} {"id": "isc-te-00321-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Elstheim & Co", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "25 March 2026"}, "checklist": ["Two-factor authentication confirmation, issued within the last 3 months", "Account purpose statement", "Account closure procedure", "If the account will be run by an external agency, also: agency access agreement, signed", "Platform terms acceptance record, signed", "Naming convention approval, signed", "Account request form, signed"], "submission": {"case": {"name": "new social media account XI-38854", "reference": "TG-11955", "details": ["The account will be run entirely by in-house staff."]}, "documents received": ["account_request_form_XI-38854.pdf — An account request form for new social media account XI-38854, dated 19 January 2026. It is signed by the requesting marketing manager and is a single page.", "account_closure_procedure_XI-38854.pdf — An account closure procedure for new social media account XI-38854, dated 7 December 2025. It is a single page.", "account_purpose_statement_XI-38854.pdf — An account purpose statement for new social media account XI-38854, dated 3 March 2026. It is a single page.", "file_0093.pdf — The file will not open, so its contents cannot be seen.", "platform_terms_acceptance_record_XI-38854.pdf — A platform terms acceptance record for new social media account XI-38854, dated 31 January 2026. It is signed by the account owner and is a single page.", "naming_convention_approval_XI-38854.pdf — A naming convention approval for new social media account XI-38854, dated 15 March 2026. It is signed by the brand governance lead and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00491-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Elvburg Partners", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "2 September 2026"}, "checklist": ["Damaged goods exception sheet issued within the last 1 months and signed", "Transfer completion confirmation issued within the last 1 months and signed", "Cross-dock slot booking sheet issued within the last 1 months and signed", "Seal number log issued within the last 1 months and signed", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet issued within the last 1 months and signed", "Transfer manifest signed"], "submission": {"case": {"name": "cross-dock transfer AW-98841", "reference": "LJ-77614", "details": ["The transfer includes no temperature-controlled load."]}, "documents received": ["Damaged goods exception sheet for cross-dock transfer AW-98841, dated 24 August 2026. Single page, signed by the warehouse supervisor.", "Cross-dock slot booking sheet for cross-dock transfer AW-98841, dated 23 August 2026. Single page, signed by the dock scheduler.", "Seal number log for cross-dock transfer AW-98841, dated 31 August 2026. Single page, signed by the loading bay operative.", "Load consolidation sheet for cross-dock transfer AW-98841, dated 26 August 2026. 2 pages, complete, signed by the load consolidation clerk.", "Printed-out text message from the driver for cross-dock transfer AW-98841, dated 28 August 2026. Single page, signed by the driver.", "Transfer manifest for cross-dock transfer AW-98841, dated 25 May 2026. 3 pages, complete, signed by the transport planner.", "Transfer completion confirmation for cross-dock transfer AW-98841, dated 28 August 2026. Single page, signed by the transport coordinator."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; base your judgement on the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-42", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 846}} {"id": "isc-te-00150-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jarlmouth LLP", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "17 June 2026"}, "checklist": ["If the supplier is a foreign company, also: certified translation of the certificate of incorporation (signed)", "Certificate of incorporation", "Supplier declaration of no conflicts of interest (signed)", "Bank details confirmation letter (issued within the last 3 months, signed)", "Supplier registration form (signed)"], "submission": {"case": {"name": "Xanhall Inc", "reference": "EC-70750", "details": ["The supplier is a domestic company."]}, "cover note": "Please find attached the onboarding pack for Xanhall Inc, reference EC-70750. I am not certain that everything needed is included, so please let me know if anything further is required.", "documents received": ["Supplier registration form for Xanhall Inc, dated 12 May 2026. 3 pages, complete, signed by an authorised company representative.", "Certificate of insurance for Xanhall Inc, showing an expiry date of 31 October 2027. 2 pages, complete.", "Supplier declaration of no conflicts of interest for Xanhall Inc, dated 18 May 2026. Single page, signed by a company director.", "Certificate of incorporation for Xanhall Inc, issued 19 February 2026. 2 pages, complete.", "Bank details confirmation letter for Xanhall Inc, issued 5 May 2026. Single page, signed by a bank officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 722}} {"id": "isc-te-00006-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Lindby Limited", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "26 August 2026"}, "checklist": ["Outstanding advance clearance check, signed.", "Trip itinerary and approval, issued within the last 3 months, signed.", "Employee bank detail confirmation, issued within the last 6 months, signed.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Travel advance request form, signed.", "Costed trip estimate sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "Mert Tadsall", "reference": "BC-86447", "details": ["The requested advance is within the standard advance limit."]}, "documents received": ["BC-86447_travel_advance_request_form_Mert_Tadsall.pdf - Travel advance request form for Mert Tadsall, dated 13 August 2026. 1 page. Signed by Mert Tadsall, the employee.", "BC-86447_costed_trip_estimate_sheet_Mert_Tadsall.pdf - Costed trip estimate sheet for Mert Tadsall, dated 9 August 2026. 1 page. Signed by the line manager.", "BC-86447_trip_itinerary_and_approval_Mert_Tadsall.pdf - Trip itinerary and approval for Mert Tadsall, dated 6 August 2026. 2 pages, complete. Signed by the line manager.", "BC-86447_bank_statement_colleague.pdf - Bank statement belonging to a colleague, filed in the name of Mert Tadsall, dated 13 March 2026. 1 page. Signed by the colleague, the account holder.", "BC-86447_line_manager_approval_Mert_Tadsall.pdf - Line manager approval for the advance for Mert Tadsall, dated 19 August 2026. 1 page. Signed by the line manager.", "BC-86447_outstanding_advance_clearance_check_Mert_Tadsall.pdf - Outstanding advance clearance check for Mert Tadsall, dated 3 June 2026. 1 page. Signed by the accounts payable supervisor.", "BC-86447_payroll_deduction_agreement_Mert_Tadsall.pdf - Payroll deduction agreement for recovery of the advance for Mert Tadsall, dated 7 July 2026. 1 page. Signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 927}} {"id": "isc-te-00311-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Bravwald & Co", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "18 May 2026"}, "checklist": ["Obtain a racking inspection report issued within the last 12 months and signed.", "Obtain a utilities connection certificate.", "Obtain a signed floor load capacity report.", "If the warehouse site is in a flood risk area, also obtain a signed flood risk assessment.", "Obtain a fire safety certificate that is valid (not expired) on the date of the review.", "Obtain planning permission.", "Obtain an asbestos survey.", "If the warehouse stores food products, also obtain a food storage approval certificate that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "warehouse EG-76741", "reference": "PM-89902", "details": ["The warehouse site is not in a flood risk area.", "The warehouse stores no food products."]}, "cover note": "I have put the pack together and sent it over, but I am not sure everything needed is in there. Please let me know if anything else is required.", "documents received": ["Signed lease agreement for warehouse EG-76741, issued on 10 March 2026. 8 pages, complete. Signed by the landlord.", "Racking inspection report for warehouse EG-76741, issued on 26 October 2025. 2 pages, complete. Signed by the inspecting engineer.", "Racking supplier's marketing brochure for warehouse EG-76741, issued on 28 January 2026. 3 pages, complete. Signed by the sales representative.", "Floor load capacity report for warehouse EG-76741, issued on 28 January 2026. 3 pages, complete. Signed by the structural engineer.", "Utilities connection certificate for warehouse EG-76741, issued on 25 March 2026. Single page.", "Asbestos survey for warehouse EG-76741, issued on 26 March 2026. 5 pages, complete.", "Fire safety certificate for warehouse EG-76741, with an expiry date of 23 February 2027. 2 pages, complete.", "Planning permission for warehouse EG-76741, issued on 27 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 919}} {"id": "isc-te-00415-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Jaskmouth & Co", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "11 March 2026"}, "checklist": ["Childcare payment receipt, issued within the last 13 months.", "Rental income record.", "Gift aid donation summary.", "Tax return draft printout, signed.", "Pension contribution certificate, issued within the last 13 months.", "Employment income summary, issued within the last 13 months."], "submission": {"case": {"name": "household tax affairs MM-28293", "reference": "OJ-52114"}, "documents received": ["Employment income summary for household tax affairs MM-28293. Date of issue: 23 September 2025. 2 pages, complete.", "Tax return draft printout for household tax affairs MM-28293. Date of issue: 10 December 2025. 6 pages, complete. Signed by the household's tax filer.", "Rental income record for household tax affairs MM-28293. Date of issue: 6 December 2025. 4 pages, complete.", "Pension contribution certificate for household tax affairs MM-28293. Date of issue: 9 November 2025. 2 pages, complete.", "Childcare payment receipt for household tax affairs MM-28293. Date of issue: 5 February 2026. Single page.", "Gift aid donation summary for household tax affairs MM-28293. Date of issue: 10 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 751}} {"id": "isc-te-00000-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Jorbury Partners", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "17 April 2026"}, "checklist": ["Obtain the signed non-disclosure reminder acknowledgement.", "Obtain the final payroll cut-off note, issued within the last 1 months and signed.", "If the leaver held privileged administrator accounts, also obtain the privileged account revocation certificate, issued within the last 1 months and signed.", "Obtain the service desk ticket closure summary, issued within the last 1 months.", "Obtain the line manager confirmation, issued within the last 1 months and signed."], "submission": {"case": {"name": "Matthias Grubisey", "reference": "TW-20429", "details": ["The leaver held privileged administrator accounts."]}, "documents received": ["service_desk_ticket_closure_summary_grubisey_11apr2026.pdf — A service desk ticket closure summary for Matthias Grubisey, dated 11 April 2026. 3 pages, complete.", "privileged_account_revocation_cert_grubisey_13apr2026.pdf — A single-page privileged account revocation certificate for Matthias Grubisey, dated 13 April 2026. It is signed by the identity and access management team lead.", "ndc_reminder_ack_grubisey_28dec2025.pdf — A single-page non-disclosure reminder acknowledgement for Matthias Grubisey, dated 28 December 2025. It is signed by Matthias Grubisey.", "final_payroll_cutoff_note_grubisey_2apr2026.pdf — A single-page final payroll cut-off note for Matthias Grubisey, dated 2 April 2026. It is signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 784}} {"id": "isc-te-00329-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Orrmark BV", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "8 July 2026"}, "checklist": ["Check that the pack includes a capital gains asset record.", "Check that the pack includes a bank interest statement issued within the last 13 months.", "Check that the pack includes an employment income summary issued within the last 13 months.", "If one household member worked abroad for part of the year, also check that the pack includes a foreign earnings statement issued within the last 13 months.", "Check that the pack includes a gift aid donation summary."], "submission": {"case": {"name": "household tax affairs QR-65635", "reference": "LW-27135", "details": ["No household member worked abroad at any point during the year."]}, "documents received": ["employment_income_summary_QR-65635.pdf - Employment income summary for household tax affairs QR-65635. It shows a date of issue of 13 September 2025. 2 pages, complete.", "bank_interest_statement_QR-65635.pdf - Bank interest statement for household tax affairs QR-65635. It shows a date of issue of 18 May 2026. 3 pages, complete.", "childcare_payment_receipt_QR-65635.pdf - Childcare payment receipt for household tax affairs QR-65635. It shows a date of issue of 19 June 2025. It is a single page.", "capital_gains_asset_record_QR-65635.pdf - Capital gains asset record for household tax affairs QR-65635. It shows a date of issue of 24 May 2026. 2 pages, complete.", "gift_aid_donation_summary_QR-65635.pdf - Gift aid donation summary for household tax affairs QR-65635. It shows a date of issue of 15 March 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 840}} {"id": "isc-te-00420-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ebrfield plc", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "10 September 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed", "Anti-bribery policy statement, signed", "Supplier declaration of no conflicts of interest, signed", "Certificate of incorporation", "Supplier registration form, signed"], "submission": {"case": {"name": "Maldcrest Partners", "reference": "LF-56948", "details": ["The supplier is a foreign company."]}, "documents received": ["Bank details confirmation letter - Maldcrest Partners.pdf\nA single-page bank details confirmation letter for Maldcrest Partners, dated 14 August 2026. It is signed by a bank officer.", "Supplier declaration of no conflicts of interest - Maldcrest Partners.pdf\nA single-page supplier declaration of no conflicts of interest for Maldcrest Partners, dated 4 July 2026. It is signed by a director of Maldcrest Partners.", "Certified translation of the certificate of incorporation - Maldcrest Partners.pdf\nA certified translation of the certificate of incorporation for Maldcrest Partners, dated 12 August 2026. It is 2 pages, complete, and signed by a certified translator.", "Certificate of incorporation - Maldcrest Partners.pdf\nA certificate of incorporation for Maldcrest Partners, dated 19 May 2026. It is 2 pages, complete.", "Supplier registration form - Maldcrest Partners.pdf\nA supplier registration form for Maldcrest Partners, dated 3 June 2026. It is 3 pages, complete, and signed by a director of Maldcrest Partners.", "Anti-bribery policy statement - Maldcrest Partners.pdf\nAn anti-bribery policy statement for Maldcrest Partners, dated 18 August 2026. It is 2 pages, complete, and signed by a director of Maldcrest Partners.", "General terms and conditions - Maldcrest Partners.pdf\nA signed copy of the general terms and conditions for Maldcrest Partners, dated 7 July 2026. It is 6 pages, complete, and signed by a director of Maldcrest Partners."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 871}} {"id": "isc-te-00358-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Kestlock Ltd", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "4 August 2026"}, "checklist": ["Check that the expense claim form is signed.", "Check that the train ticket receipt is present.", "Check that the currency conversion statement was issued within the last 6 months.", "If the claim includes mileage for use of a private car, also check that the mileage log is signed.", "Check that the boarding pass stub is present.", "Check that the taxi fare receipt was issued within the last 6 months."], "submission": {"case": {"name": "Emre Tibins", "reference": "QF-77856", "details": ["The claim includes no private car mileage."]}, "documents received": ["train_ticket_receipt_QF-77856.pdf — Train ticket receipt about Emre Tibins, dated 28 July 2026. It is a single page.", "expense_claim_form_complete_QF-77856.pdf — Expense claim form about Emre Tibins, dated 4 June 2026. All 2 of its 2 pages are included (2 pages, complete). Signed by the claiming employee.", "taxi_fare_receipt_QF-77856.pdf — Taxi fare receipt about Emre Tibins, dated 8 July 2026. It is a single page.", "restaurant_receipt_QF-77856.pdf — Restaurant receipt about Emre Tibins, dated 25 June 2026. It is a single page.", "file_08_QF-77856.pdf — The contents of this file cannot be seen, as the scan is blank and too faint to read.", "boarding_pass_stub_QF-77856.pdf — Boarding pass stub about Emre Tibins, dated 7 April 2026. It is a single page.", "currency_conversion_statement_QF-77856.pdf — Currency conversion statement about Emre Tibins, dated 30 June 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 832}} {"id": "isc-te-00295-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Gormlock BV", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "29 May 2026"}, "checklist": ["Completed annual leave request form, signed", "If the leave requested is longer than 2 weeks, also: extended absence cover plan, signed", "Return to work date confirmation", "Statutory holiday entitlement confirmation", "Manager approval email, issued within the last 2 months", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave, signed", "Team holiday planner extract"], "submission": {"case": {"name": "Alice Gillsall", "reference": "SV-90688", "details": ["The leave requested is longer than two weeks.", "The employee is requesting leave during a known busy period."]}, "cover note": "The paperwork is all in order, so a quick approval would be much appreciated. Many thanks for your help.", "documents received": ["Scanned team holiday planner extract for Alice Gillsall, dated 13 February 2026. 2 pages, complete.", "Scanned business case for peak-period leave for Alice Gillsall, dated 25 February 2026. 2 pages, complete, signed by the line manager.", "Scanned leave balance statement for Alice Gillsall, dated 11 May 2026. Single page.", "Scanned statutory holiday entitlement confirmation for Alice Gillsall, dated 28 February 2026. Single page.", "Scanned contact plan for time away for Alice Gillsall, dated 8 May 2026. Single page.", "Scanned completed annual leave request form for Alice Gillsall, dated 20 April 2026. Single page, signed by the employee.", "Scanned extended absence cover plan for Alice Gillsall, dated 21 May 2026. 3 pages, complete, signed by the line manager.", "Scanned manager approval email for Alice Gillsall, dated 20 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Does the pack satisfy the checklist? Work through each checklist line relevant to this case. A required document counts only if it matches the kind of document listed (not a similar one), concerns the subject of the case, contains all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "variant-32", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00020-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Belmburg GmbH", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "3 March 2026"}, "checklist": ["Lifting equipment inspection report, issued within the last 6 months and signed", "Parking bay suspension approval, issued within the last 1 months and signed", "New floor snagging list, issued within the last 1 months and signed", "Signed move plan", "IT decommissioning certificate, issued within the last 1 months and signed"], "submission": {"case": {"name": "office move project AZ-40366", "reference": "NC-30638"}, "documents received": ["Lifting equipment inspection report for office move project AZ-40366. Date of issue: 27 November 2025. 2 pages, complete. Signed by the lifting equipment inspector.", "Furniture inventory list for office move project AZ-40366. Date of issue: 25 February 2026. 4 pages, complete. Signed by the facilities coordinator.", "Parking bay suspension approval for office move project AZ-40366. Date of issue: 25 February 2026. 1 page. Signed by the traffic management officer.", "Crate hire agreement for office move project AZ-40366. Date of issue: 10 February 2026. 2 pages, complete. Signed by the crate hire supplier's representative.", "New floor snagging list for office move project AZ-40366. Date of issue: 21 February 2026. 3 pages, complete. Signed by the site manager.", "IT decommissioning certificate for office move project AZ-40366. Date of issue: 14 February 2026. 1 page. Signed by the IT manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 789}} {"id": "isc-te-00415-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Jaskmouth & Co", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "11 March 2026"}, "checklist": ["Childcare payment receipt, issued within the last 13 months.", "Rental income record.", "Gift aid donation summary.", "Tax return draft printout, signed.", "Pension contribution certificate, issued within the last 13 months.", "Employment income summary, issued within the last 13 months."], "submission": {"case": {"name": "household tax affairs MM-28293", "reference": "OJ-52114"}, "cover note": "Please accept my apologies that this pack was put together in a rush.", "documents received": ["Childcare payment receipt for household tax affairs MM-28293. Date of issue: 5 February 2026. Single page.", "Employment income summary for household tax affairs MM-28293. Date of issue: 23 September 2025. 2 pages, complete.", "Pension contribution certificate for household tax affairs MM-28293. Date of issue: 9 November 2025. 2 pages, complete.", "Capital gains asset record for household tax affairs MM-28293. Date of issue: 31 January 2026. 2 pages, complete.", "Gift aid donation summary for household tax affairs MM-28293. Date of issue: 10 December 2025. Single page.", "Tax return draft printout for household tax affairs MM-28293. Date of issue: 10 December 2025. 6 pages, complete. Signed by the household's tax filer.", "Rental income record for household tax affairs MM-28293. Date of issue: 6 December 2025. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00071-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Jundhurst GmbH", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "7 August 2026"}, "checklist": ["If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review.", "Three quotes comparison sheet, issued within the last 3 months, signed.", "Equipment purchase request form, signed.", "Grant fund eligibility note, issued within the last 6 months, signed.", "Installation requirements note."], "submission": {"case": {"name": "equipment LF-3374", "reference": "UQ-10155", "details": ["The equipment uses radioactive sources."]}, "documents received": ["Maintenance plan for equipment LF-3374, issued 20 April 2026. 2 pages, complete.", "Installation requirements note for equipment LF-3374, issued 3 July 2026. 2 pages, complete.", "Three quotes comparison sheet for equipment LF-3374, issued 22 July 2026. Single page. Signed by the procurement officer.", "Single vendor quotation for equipment LF-3374, issued 22 July 2026. Single page. Signed by the vendor's sales representative.", "Grant fund eligibility note for equipment LF-3374, issued 7 April 2026. Single page. Signed by the grants officer.", "Equipment purchase request form for equipment LF-3374, issued 8 May 2026. 2 pages, complete. Signed by the requesting department head.", "File scanned as doc_7731.pdf; the page is upside down and blurred, so its contents cannot be seen.", "Radiation licence for equipment LF-3374, showing an expiry date of 22 June 2028. Single page."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 791}} {"id": "isc-te-00084-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Stervfeld GmbH", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "10 September 2026"}, "checklist": ["If the design changes how customer data is stored, also: data protection review sign-off (signed)", "review board feedback summary (issued within the last 3 months, signed)", "proposed architecture diagram", "problem statement page", "cost estimate sheet (issued within the last 6 months)", "security threat model (issued within the last 6 months)"], "submission": {"case": {"name": "design document AE-97456", "reference": "UG-66655", "details": ["The design changes how customer data is stored."]}, "documents received": ["Security threat model for design document AE-97456. Date of issue: 7 June 2026. 4 pages, complete.", "File scan_0817.pdf. The scan is blank and too faint, so its contents cannot be seen.", "Problem statement page for design document AE-97456. Date of issue: 7 August 2026. 2 pages, complete.", "Review board feedback summary for design document AE-97456. Date of issue: 3 August 2026. 2 pages, complete. Signed by the review board chair.", "Capacity and load estimate for design document AE-97456. Date of issue: 13 April 2026. 3 pages, complete.", "Data protection review sign-off for design document AE-97456. Date of issue: 17 May 2026. 2 pages, complete. Signed by the data protection officer.", "Cost estimate sheet for design document AE-97456. Date of issue: 30 August 2026. 2 pages, complete.", "Proposed architecture diagram for design document AE-97456. Date of issue: 18 August 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "conditional", "defect": "document present (circumstance holds), plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 824}} {"id": "isc-te-00409-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Jundwald Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "28 August 2026"}, "checklist": ["Audit finding sheets, signed", "Audit attendance sheet, signed", "Previous audit follow-up record, issued within the last 24 months, signed", "Audit interview notes, signed", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list, signed"], "submission": {"case": {"name": "internal audit AM-70822", "reference": "KP-15972", "details": ["The audit did not cover the calibration laboratory."]}, "documents received": ["Audit finding sheets AM-70822.pdf. Dated 5 July 2026, the sheets record the findings of internal audit AM-70822. 2 pages, complete. Each sheet is signed by the lead auditor.", "Internal audit plan AM-70822.pdf. Dated 21 June 2026, this plan sets out the scope and schedule of internal audit AM-70822. 2 pages, complete. It is signed by the quality manager.", "Audit attendance sheet AM-70822.pdf. This single page, dated 16 August 2026, lists those present at internal audit AM-70822. It is signed by the lead auditor.", "Previous audit follow-up record AM-70822.pdf. Dated 16 October 2025, this record covers the follow-up actions from internal audit AM-70822. 2 pages, complete. It is signed by the quality manager.", "Audit interview notes AM-70822.pdf. These notes, dated 26 June 2026, cover the interviews held during internal audit AM-70822. 3 pages, complete. They are signed by the auditor who conducted the interviews."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 810}} {"id": "isc-te-00227-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Gravlock plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "24 June 2026"}, "checklist": ["supplier quality questionnaire, issued within the last 12 months, signed", "supplier capacity declaration, issued within the last 12 months, signed", "supplier audit report, issued within the last 24 months, signed", "supplier corrective action plan, issued within the last 6 months, signed", "financial stability statement, issued within the last 12 months, signed", "certified quality management system certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Mersheim BV", "reference": "TB-65922"}, "documents received": ["TB-65922_certified_qms_certificate_Mersheim.pdf - Certified quality management system certificate for Mersheim BV. Expiry date: 19 October 2028. Single page.", "TB-65922_supplier_capacity_declaration_Mersheim_v3.pdf - Supplier capacity declaration for Mersheim BV. Date of issue: 22 March 2025. 2 pages, complete. Signed by the supplier's operations manager.", "TB-65922_financial_stability_statement_Mersheim.pdf - Financial stability statement for Mersheim BV. Date of issue: 11 April 2026. 2 pages, complete. Signed by the supplier's finance director.", "TB-65922_supplier_corrective_action_plan_Mersheim.pdf - Supplier corrective action plan for Mersheim BV. Date of issue: 11 March 2026. 3 pages, complete. Signed by the supplier's quality manager.", "TB-65922_supplier_audit_report_Mersheim.pdf - Supplier audit report for Mersheim BV. Date of issue: 2 July 2025. 8 pages, complete. Signed by the lead auditor.", "TB-65922_supplier_quality_questionnaire_Mersheim.pdf - Supplier quality questionnaire for Mersheim BV. Date of issue: 19 November 2025. 4 pages, complete. Signed by the supplier's quality manager.", "TB-65922_supplier_capacity_declaration_Mersheim_v2.pdf - Supplier capacity declaration for Mersheim BV. Date of issue: 8 July 2025. 2 pages, complete. Signed by the supplier's operations manager."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist: is it complete? Work through each line of the checklist that applies to this case. A required document only counts when it is the kind of document listed (not a similar one), concerns the subject of the case, has all its pages, is signed wherever the checklist requires a signature, had not expired on the date of the review, and was issued inside the period the checklist allows. A conditional line applies only if its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-44", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 927}} {"id": "isc-te-00262-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Baxberg Inc", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "24 March 2026"}, "checklist": ["Privacy policy update, issued within the last 3 months.", "Age rating questionnaire, signed.", "Crash-free rate report, issued within the last 1 months.", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months, signed.", "Release notes, issued within the last 1 months.", "Store listing description, issued within the last 1 months.", "Marketing screenshot pack."], "submission": {"case": {"name": "mobile app release KP-37893", "reference": "MT-55379", "details": ["The mobile app release includes no third-party analytics."]}, "documents received": ["KP-37893_device_compatibility_matrix.pdf — A device compatibility matrix for mobile app release KP-37893, dated 28 January 2026. 2 pages, complete.", "KP-37893_store_listing_description.pdf — A store listing description for mobile app release KP-37893, dated 7 March 2026. A single page.", "KP-37893_crash_free_rate_report.pdf — A crash-free rate report for mobile app release KP-37893, dated 12 March 2026. A single page.", "KP-37893_privacy_policy_update.pdf — A privacy policy update for mobile app release KP-37893, dated 14 January 2026. 2 pages, complete.", "KP-37893_age_rating_questionnaire.pdf — An age rating questionnaire for mobile app release KP-37893, dated 26 January 2026. It carries the signature of the release manager. 2 pages, complete.", "KP-37893_release_notes_07062025.pdf — Release notes for mobile app release KP-37893, dated 7 June 2025. 2 pages, complete.", "KP-37893_marketing_screenshot_pack.pdf — A marketing screenshot pack for mobile app release KP-37893, dated 23 January 2026. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 908}} {"id": "isc-te-00048-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lombmore Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "7 September 2026"}, "checklist": ["Audit finding sheets (signed)", "Management review minutes (signed)", "If the audit found a major non-conformity, also: major non-conformity corrective action plan (signed)", "Audit attendance sheet (signed)", "Previous audit follow-up record (issued within the last 24 months, signed)"], "submission": {"case": {"name": "internal audit IG-1902", "reference": "OH-77753", "details": ["The audit found a major non-conformity."]}, "documents received": ["Previous audit follow-up record for internal audit IG-1902, dated 25 January 2025. 2 pages, complete. Signed by the quality manager.", "Audit attendance sheet for internal audit IG-1902, dated 21 June 2026. Single page. Signed by the lead auditor.", "Management review minutes for internal audit IG-1902, dated 25 May 2026. 4 pages, complete. Signed by the quality manager.", "Audit finding sheets for internal audit IG-1902, dated 17 June 2026. 2 pages, complete. Signed by the lead auditor.", "Major non-conformity corrective action plan for internal audit IG-1902, dated 14 June 2026. 3 pages, complete. Signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Review every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-71", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 727}} {"id": "isc-te-00297-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Kaldlock BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "21 July 2026"}, "checklist": ["Written grievance statement, signed", "Witness list, signed", "Adjustment request record, issued within the last 3 months, signed", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed", "Evidence bundle index, signed", "Grievance procedure acknowledgement, issued within the last 3 months, signed"], "submission": {"case": {"name": "Hannah Kerrmore", "reference": "SB-29513", "details": ["The grievance is against the employee's direct manager."]}, "documents received": ["Written grievance statement about Hannah Kerrmore. Dated 26 April 2026. 3 pages, complete. Signed by the complaining employee, Hannah Kerrmore.", "Adjustment request record about Hannah Kerrmore. Dated 6 July 2026. Single page. Signed by the HR case handler.", "Grievance procedure acknowledgement about Hannah Kerrmore. Dated 4 May 2025. Single page. Signed by the complaining employee, Hannah Kerrmore.", "Evidence bundle index about Hannah Kerrmore. Dated 9 July 2026. 2 pages, complete. Signed by the HR case handler.", "Witness list about Hannah Kerrmore. Dated 21 April 2026. Single page. Signed by the complaining employee, Hannah Kerrmore.", "Alternative manager reporting line note about Hannah Kerrmore. Dated 16 May 2026. Single page. Signed by the HR case handler."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 747}} {"id": "isc-te-00457-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Kenvdale BV", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "16 June 2026"}, "checklist": ["If the requested advance is above the standard advance limit, also: finance director approval for the higher advance (signed)", "Travel advance request form (signed)", "Travel policy extract showing advance eligibility", "Costed trip estimate sheet (issued within the last 3 months, signed)", "Line manager approval for the advance (signed)", "Trip itinerary and approval (issued within the last 3 months, signed)", "Payroll deduction agreement for recovery of the advance (signed)"], "submission": {"case": {"name": "Orla Natfield", "reference": "LZ-40963", "details": ["The requested advance is above the standard advance limit."]}, "documents received": ["Travel advance request form - Orla Natfield - 2 May 2026.pdf. A travel advance request form relating to Orla Natfield, dated 2 May 2026. It is 1 page and signed by the employee.", "Outstanding advance clearance check - Orla Natfield - 23 February 2026.pdf. An outstanding advance clearance check relating to Orla Natfield, dated 23 February 2026. It is 1 page and signed by the payroll administrator.", "Employee bank detail confirmation - Orla Natfield - 29 March 2026.pdf. An employee bank detail confirmation relating to Orla Natfield, dated 29 March 2026. It is 1 page and signed by the employee.", "Trip itinerary and approval - Orla Natfield - 22 March 2026.pdf. A trip itinerary and approval relating to Orla Natfield, dated 22 March 2026. It is 2 pages, complete, and signed by the line manager.", "FD approval higher advance - Orla Natfield - 4 March 2026.pdf. A finance director approval for the higher advance relating to Orla Natfield, dated 4 March 2026. It is 1 page and carries the signature of the finance director.", "Travel policy extract - Orla Natfield - 28 February 2026.pdf. A travel policy extract showing advance eligibility relating to Orla Natfield, dated 28 February 2026. It is 1 page.", "Line manager approval - Orla Natfield - 25 February 2026.pdf. A line manager approval for the advance relating to Orla Natfield, dated 25 February 2026. It is 1 page and signed by the line manager.", "Payroll deduction agreement - Orla Natfield - 31 May 2026.pdf. A payroll deduction agreement for recovery of the advance relating to Orla Natfield, dated 31 May 2026. It is 1 page and signed by the employee.", "Costed trip estimate sheet - Orla Natfield - 22 May 2026.pdf. A costed trip estimate sheet relating to Orla Natfield, dated 22 May 2026. It is 1 page and signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1095}} {"id": "isc-te-00003-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Quorfell Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "18 June 2026"}, "checklist": ["Check that the pack includes a signed post-change test plan.", "Check that the pack includes a current rule set export issued within the last 1 month.", "Check that the pack includes a signed firewall change request form.", "Check that the pack includes a peer review checklist issued within the last 1 month and signed."], "submission": {"case": {"name": "firewall change JC-89924", "reference": "GT-12592"}, "cover note": "I am not fully sure that everything needed for this pack is included, so please check it carefully during the review on 18 June 2026.", "documents received": ["jc-89924_firewall_change_request_form_v3.pdf. Firewall change request form for firewall change JC-89924, dated 15 March 2026. 3 pages, complete. Signed by the requesting change manager.", "jc-89924_peer_review_checklist.pdf. Peer review checklist for firewall change JC-89924, dated 2 June 2026. Single page. Signed by the reviewing network security analyst.", "jc-89924_current_rule_set_export.pdf. Current rule set export for firewall change JC-89924, dated 5 June 2026. 8 pages, complete.", "jc-89924_post-change_test_plan.pdf. Post-change test plan for firewall change JC-89924, dated 16 May 2026. 2 pages, complete. Signed by the lead network security engineer.", "jc-89924_rollback_plan.pdf. Rollback plan for firewall change JC-89924, dated 8 June 2026. 2 pages, complete. Signed by the lead network security engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 813}} {"id": "isc-te-00268-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zaldby BV", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "8 June 2026"}, "checklist": ["If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review.", "Travel insurance quote, issued within the last 1 months.", "Passport details form, signed.", "Hotel availability printout, issued within the last 1 months, signed.", "Booking request form, signed.", "Customer deposit receipt, issued within the last 3 months.", "Special requests note, signed."], "submission": {"case": {"name": "holiday booking TG-76662", "reference": "VD-54906", "details": ["The booking includes a child traveller."]}, "documents received": ["Special requests note for holiday booking TG-76662. Date of issue: 21 May 2026. 1 page. Signed by the reservations agent.", "Booking request form for holiday booking TG-76662. Date of issue: 15 March 2026. 2 pages, complete. Signed by the reservations agent.", "Passport details form for holiday booking TG-76662. Date of issue: 3 March 2026. 1 page. Signed by the lead traveller.", "Customer deposit receipt for holiday booking TG-76662. Date of issue: 30 April 2026. 1 page.", "Travel insurance quote for holiday booking TG-76662. Date of issue: 20 May 2026. Pages 1-1 of 2.", "Hotel availability printout for holiday booking TG-76662. Date of issue: 28 May 2026. 2 pages, complete. Signed by the hotel reservations manager.", "Flight availability printout for holiday booking TG-76662. Date of issue: 27 May 2026. 2 pages, complete.", "Child passport copy for holiday booking TG-76662. Expiry date shown: 30 September 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 861}} {"id": "isc-te-00262-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Baxberg Inc", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "24 March 2026"}, "checklist": ["Privacy policy update, issued within the last 3 months.", "Age rating questionnaire, signed.", "Crash-free rate report, issued within the last 1 months.", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months, signed.", "Release notes, issued within the last 1 months.", "Store listing description, issued within the last 1 months.", "Marketing screenshot pack."], "submission": {"case": {"name": "mobile app release KP-37893", "reference": "MT-55379", "details": ["The mobile app release includes no third-party analytics."]}, "documents received": ["KP-37893_privacy_policy_update.pdf — A privacy policy update for mobile app release KP-37893, dated 14 January 2026. 2 pages, complete.", "KP-37893_localisation_completeness_report.pdf — A localisation completeness report for mobile app release KP-37893, dated 16 March 2026. 2 pages, complete.", "KP-37893_crash_free_rate_report.pdf — A crash-free rate report for mobile app release KP-37893, dated 12 March 2026. A single page.", "KP-37893_store_listing_description.pdf — A store listing description for mobile app release KP-37893, dated 7 March 2026. A single page.", "KP-37893_marketing_screenshot_pack.pdf — A marketing screenshot pack for mobile app release KP-37893, dated 23 January 2026. 6 pages, complete.", "KP-37893_release_notes_05032026.pdf — Release notes for mobile app release KP-37893, dated 5 March 2026. 2 pages, complete.", "KP-37893_release_notes_17122024.pdf — Release notes for mobile app release KP-37893, dated 17 December 2024. 2 pages, complete.", "KP-37893_age_rating_questionnaire.pdf — An age rating questionnaire for mobile app release KP-37893, dated 26 January 2026. It carries the signature of the release manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 963}} {"id": "isc-te-00319-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Oskford BV", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "17 September 2026"}, "checklist": ["Supplier self-assessment report, issued within the last 12 months and signed.", "Certified quality management system certificate, valid (not expired) on the date of the review.", "Financial stability statement, issued within the last 12 months and signed.", "Raw material certificate of analysis, issued within the last 6 months and signed.", "If the supplier provides parts that are safety-critical, also: process failure mode and effects analysis, signed.", "Supplier audit report, issued within the last 24 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed."], "submission": {"case": {"name": "Elstfeld SAS", "reference": "QD-20096", "details": ["The supplier provides parts that are safety-critical."]}, "cover note": "This pack has already been checked by a colleague, so it should be ready to go through.", "documents received": ["Supplier self-assessment report for Elstfeld SAS. Date of issue: 14 May 2026. 6 pages, complete. Signed by the supplier's quality manager.", "Supplier quality questionnaire for Elstfeld SAS. Date of issue: 29 January 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Supplier audit report for Elstfeld SAS. Date of issue: 6 January 2025. 8 pages, complete. Signed by the lead auditor.", "Certified quality management system certificate for Elstfeld SAS. Expiry date: 8 March 2028. Single page.", "Financial stability statement for Elstfeld SAS. Date of issue: 6 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Raw material certificate of analysis for Elstfeld SAS. Date of issue: 6 July 2026. 2 pages, complete. Signed by the supplier's laboratory manager."]}}, "question": {"type": "choice", "instructions": "Judge whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-12", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 834}} {"id": "isc-te-00165-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Teskwater Limited", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "3 July 2026"}, "checklist": ["Gateway integration request form, signed", "Test environment transaction log, issued within the last 1 months", "If the gateway will handle recurring subscription payments, also: subscription billing mandate template, signed", "Go-live sign-off certificate, issued within the last 1 months, signed", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review", "Payment gateway technical specification", "Penetration test summary, issued within the last 6 months, signed"], "submission": {"case": {"name": "payment gateway EG-51001", "reference": "MP-69353", "details": ["The gateway will handle recurring subscription payments.", "The gateway will not store customers' card details."]}, "documents received": ["Payment gateway technical specification for payment gateway EG-51001, dated 5 May 2026. 8 pages, complete.", "Test environment transaction log for payment gateway EG-51001, dated 30 June 2026. 4 pages, complete.", "Gateway integration request form for payment gateway EG-51001, dated 3 April 2026. 2 pages, complete. It is signed by the Head of Payments and IT Security.", "Subscription billing mandate template for payment gateway EG-51001, dated 4 April 2026. 2 pages, complete. It is signed by the Treasury Manager.", "Fraud screening configuration sheet for payment gateway EG-51001, dated 16 April 2026. 1 page. It is signed by the IT Security Lead.", "Go-live sign-off certificate for payment gateway EG-51001, dated 14 June 2026. 1 page. It is signed by the Payments Operations Director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 821}} {"id": "isc-te-00205-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Larvwick GmbH", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "23 July 2026"}, "checklist": ["Line manager opinion note, issued within the last 2 months and signed", "Impact assessment on the team, signed", "Previous flexible working requests record, issued within the last 24 months", "Current working pattern statement, issued within the last 3 months", "Flexible working request form, signed"], "submission": {"case": {"name": "Lena Lovsall", "reference": "IC-55479"}, "documents received": ["current_working_pattern_statement.pdf. A current working pattern statement about Lena Lovsall, dated 6 May 2026. It is a single page.", "line_manager_opinion_note.pdf. A line manager opinion note about Lena Lovsall, dated 16 June 2026. 2 pages, complete. It is signed by the line manager.", "impact_assessment_on_the_team.pdf. An impact assessment on the team about Lena Lovsall, dated 8 May 2026. 3 pages, complete. It is signed by the line manager.", "flexible_working_request_form.pdf. A flexible working request form about Lena Lovsall, dated 21 April 2026. 3 pages, complete. It is signed by Lena Lovsall.", "previous_flexible_working_requests_record.pdf. A previous flexible working requests record about Lena Lovsall, dated 13 July 2025. It is a single page.", "trial_period_proposal.pdf. A trial period proposal about Lena Lovsall, dated 4 June 2026. It is a single page. It is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Ask yourself: does the pack match the checklist? Review each line of the checklist that is relevant to this case. A required document only counts if it is the kind of document the list names (not a similar one), is about the case subject, has all its pages, is signed in every place the checklist asks for a signature, was not expired on the review date, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for this case. complete: all applicable lines are met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one line cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-61", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 765}} {"id": "isc-te-00192-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Glenthorpe Inc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "3 April 2026"}, "checklist": ["Shareholder register extract issued within the last 3 months.", "Beneficial owner identification form, signed.", "Certificate of incorporation.", "Company tax registration certificate.", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents.", "Board resolution to open the account, signed.", "Company statutes, signed."], "submission": {"case": {"name": "Austshaw LLP", "reference": "DH-79163", "details": ["All beneficial owners of the company are residents."]}, "cover note": "Please find attached the pack for Austshaw LLP, reference DH-79163. I am not sure whether everything needed is included, so please let me know if anything is still outstanding.", "documents received": ["Authorised signer identity document - Austshaw LLP.pdf\nAn authorised signer identity document for Austshaw LLP showing an expiry date of 29 January 2028. Single page.", "Company tax registration certificate - Austshaw LLP.pdf\nA company tax registration certificate for Austshaw LLP, dated 31 December 2025. Single page.", "Company statutes - Austshaw LLP.pdf\nCompany statutes for Austshaw LLP, dated 19 February 2026. 12 pages, complete. It is signed by a director.", "Board resolution to open the account - Austshaw LLP.pdf\nA board resolution to open the account for Austshaw LLP, dated 2 February 2026. Single page. It is signed by a director.", "Proof of registered office address - Austshaw LLP.pdf\nA proof of registered office address for Austshaw LLP, dated 31 March 2026. Single page.", "Beneficial owner identification form - Austshaw LLP.pdf\nA beneficial owner identification form for Austshaw LLP, dated 25 March 2026. 3 pages, complete. It is signed by a beneficial owner.", "Shareholder register extract - Austshaw LLP.pdf\nA shareholder register extract for Austshaw LLP, dated 10 January 2026. 2 pages, complete.", "Certificate of incorporation - Austshaw LLP.pdf\nA certificate of incorporation for Austshaw LLP, dated 6 January 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 889}} {"id": "isc-te-00404-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Oxlbury GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "11 August 2026"}, "checklist": ["Signed lease agreement, signed.", "Racking inspection report, issued within the last 12 months, signed.", "Planning permission.", "Asbestos survey.", "If the warehouse stores food products, also: food storage approval certificate, valid (not expired) on the date of the review.", "Utilities connection certificate."], "submission": {"case": {"name": "warehouse CF-86712", "reference": "NS-98453", "details": ["The warehouse stores no food products."]}, "documents received": ["utilities-connection-certificate-CF-86712.pdf — Utilities connection certificate for warehouse CF-86712. Date of issue: 29 May 2026. 1 page.", "lease-agreement-CF-86712.pdf — Signed lease agreement for warehouse CF-86712. Date of issue: 2 May 2026. 8 pages, complete. Signed by the landlord and Oxlbury GmbH.", "racking-inspection-report-CF-86712.pdf — Racking inspection report for warehouse CF-86712. Date of issue: 24 August 2025. 2 pages, complete. Signed by the racking inspector.", "asbestos-survey-CF-86712.pdf — Asbestos survey for warehouse CF-86712. Date of issue: 5 May 2026. 5 pages, complete.", "planning-permission-CF-86712.pdf — Planning permission for warehouse CF-86712. Date of issue: 2 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 783}} {"id": "isc-te-00195-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Pellside LLP", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "3 March 2026"}, "checklist": ["Authorised representative ID copy, valid (not expired) on the date of the review", "Tax registration letter", "Anti-money laundering questionnaire, signed", "Proof of trading address, issued within the last 3 months", "If the seller intends to list food or cosmetic products, also: safety compliance certificate, issued within the last 12 months", "Business registration certificate", "Product catalogue declaration, signed", "If the seller is a sole trader rather than a company, also: sole trader statutory declaration, signed"], "submission": {"case": {"name": "Quelmouth Inc", "reference": "JT-56871", "details": ["The seller intends to list food or cosmetic products.", "The seller is a sole trader rather than a company."]}, "cover note": "Everything needed is attached and complete. Please confirm the pack is in order.", "documents received": ["returns_policy_statement.pdf — Returns policy statement for Quelmouth Inc. The date of issue is 27 January 2026. 2 pages, complete. It is signed by the authorised representative.", "product_catalogue_declaration.pdf — Product catalogue declaration for Quelmouth Inc. The date of issue is 16 February 2026. 4 pages, complete. It is signed by the authorised representative.", "anti_money_laundering_questionnaire.pdf — Anti-money laundering questionnaire for Quelmouth Inc. The date of issue is 18 January 2026. 3 pages, complete. It is signed by the authorised representative.", "sole_trader_statutory_declaration.pdf — Sole trader statutory declaration for Quelmouth Inc. The date of issue is 11 November 2025. 1 page. It is signed by the seller.", "tax_registration_letter.pdf — Tax registration letter for Quelmouth Inc. The date of issue is 7 January 2026. 1 page.", "safety_compliance_certificate.pdf — Safety compliance certificate for Quelmouth Inc. The date of issue is 17 September 2025. 2 pages, complete.", "business_registration_certificate.pdf — Business registration certificate for Quelmouth Inc. The date of issue is 9 January 2026. 1 page.", "authorised_representative_ID_copy.pdf — Authorised representative ID copy for Quelmouth Inc. The expiry date shown is 6 March 2027. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 928}} {"id": "isc-te-00120-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Morvholm Group", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "3 March 2026"}, "checklist": ["Obtain the equipment breakdown claim form, signed.", "Obtain the photographs of the failed component.", "Obtain the machine maintenance log, issued within the last 6 months.", "Obtain the repair or replacement quotation, issued within the last 3 months.", "Obtain the purchase invoice for the machine.", "Obtain the production downtime log, issued within the last 3 months and signed."], "submission": {"case": {"name": "failed machine WJ-98667", "reference": "SK-93016"}, "documents received": ["repair_replacement_quotation_WJ-98667.pdf — Repair or replacement quotation for failed machine WJ-98667, dated 17 December 2025. 2 pages, complete.", "production_downtime_log_WJ-98667.pdf — Production downtime log for failed machine WJ-98667, dated 8 January 2026. It is signed by the production manager. 2 pages, complete.", "policy_machinery_schedule_WJ-98667.pdf — Policy machinery schedule for failed machine WJ-98667, dated 25 January 2026. 3 pages, complete.", "photographs_failed_component_WJ-98667.pdf — Photographs of the failed component for failed machine WJ-98667, dated 5 November 2025. 2 pages, complete.", "purchase_invoice_machine_WJ-98667.pdf — Purchase invoice for the machine, covering failed machine WJ-98667, dated 11 November 2025. It is a single page.", "equipment_breakdown_claim_form_WJ-98667.pdf — Equipment breakdown claim form for failed machine WJ-98667, dated 4 November 2025. It is signed by the policyholder's claims representative. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00093-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Gravwick Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "25 May 2026"}, "checklist": ["Proposed rule change specification, signed", "Peer review checklist, issued within the last 1 month, signed", "Firewall change request form, signed", "Rollback plan, signed", "Business justification memo, issued within the last 3 months, signed", "Post-change test plan, signed"], "submission": {"case": {"name": "firewall change SF-45426", "reference": "IO-20304"}, "documents received": ["SF-45426_firewall_change_request_form.pdf. A firewall change request form for firewall change SF-45426, dated 24 February 2026. Only pages 1-1 of 3 are included. It is signed by the requesting system administrator.", "SF-45426_business_justification_memo.pdf. A business justification memo for firewall change SF-45426, dated 24 April 2026. It is a single page and is signed by the application owner.", "SF-45426_post_change_test_plan.pdf. A firewall change request form... wait, correct: A post-change test plan for firewall change SF-45426, dated 1 February 2026. 2 pages, complete. It is signed by the test coordinator.", "SF-45426_rollback_plan.pdf. A rollback plan for firewall change SF-45426, dated 21 April 2026. 2 pages, complete. It is signed by the operations shift lead.", "SF-45426_proposed_rule_change_specification.pdf. A proposed rule change specification for firewall change SF-45426, dated 3 March 2026. 2 pages, complete. It is signed by the lead network engineer.", "SF-45426_peer_review_checklist.pdf. A peer review checklist for firewall change SF-45426, dated 8 May 2026. It is a single page and is signed by the reviewing network engineer."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide. Go through each checklist line that applies to this case. Only count a required document if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-64", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 865}} {"id": "isc-te-00118-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Wynshaw Ltd", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "4 August 2026"}, "checklist": ["Witness list, signed.", "Investigator appointment letter, issued within the last 3 months.", "Evidence bundle index, signed.", "Adjustment request record, issued within the last 3 months, signed.", "Previous grievance outcome letter, issued within the last 24 months.", "Meeting invitation with rights explained, issued within the last 1 months."], "submission": {"case": {"name": "Sanne Ingson", "reference": "PI-43445"}, "documents received": ["Previous grievance outcome letter dated 3 October 2024 concerning Sanne Ingson. Only pages 1-1 of 2 are included.", "Grievance procedure acknowledgement dated 5 July 2026 concerning Sanne Ingson. It is 1 page and is signed by Sanne Ingson.", "Witness list dated 25 April 2026 concerning Sanne Ingson. It is 1 page and is signed by the investigating officer.", "Investigator appointment letter dated 28 May 2026 concerning Sanne Ingson. It is 1 page.", "Meeting invitation with rights explained dated 24 July 2026 concerning Sanne Ingson. It is 1 page.", "Evidence bundle index dated 11 June 2026 concerning Sanne Ingson. It is 2 pages, complete, and is signed by the case administrator.", "Adjustment request record dated 16 July 2026 concerning Sanne Ingson. It is 1 page and is signed by the HR adviser."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 749}} {"id": "isc-te-00117-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Istcombe plc", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "27 May 2026"}, "checklist": ["Include a previous grievance outcome letter issued within the last 24 months.", "Include a grievance procedure acknowledgement issued within the last 3 months and signed.", "If the grievance alleges bullying by a named colleague, also include a bullying allegation evidence log, signed.", "Include an evidence bundle index, signed.", "Include a written grievance statement, signed.", "Include a meeting invitation with rights explained issued within the last 1 months.", "Include an adjustment request record issued within the last 3 months and signed."], "submission": {"case": {"name": "Piotr Aldthwaite", "reference": "RG-62178", "details": ["The grievance alleges bullying by a named colleague."]}, "cover note": "I have put the pack together, but I am not certain that everything needed is in there, so please review it and let me know if anything else should be added. Rahul Clemnall", "documents received": ["PA-RG-62178-09 previous grievance outcome letter.pdf — A previous grievance outcome letter concerning Piotr Aldthwaite, dated 15 June 4.pdf — A previous grievance outcome letter concerning Piotr Aldthwaite, dated 15 June 2024. 2 pages, complete.", "PA-RG-62178-04 evidence bundle index.pdf — An evidence bundle index concerning Piotr Aldthwaite, dated 5 February 2026. 2 pages, complete, and signed by the case coordinator.", "PA-RG-62178-06 meeting invitation with rights explained.pdf — A meeting invitation with rights explained concerning Piotr Aldthwaite, dated 9 May 2026. It is a single page.", "PA-RG-62178-05 written grievance statement.pdf — A written grievance statement concerning Piotr Aldthwaite, dated 2 April 2026. 3 pages, complete, and signed by the employee.", "PA-RG-62178-10 investigator appointment letter.pdf — An investigator appointment letter concerning Piotr Aldthwaite, dated 15 May 2026. It is a single page.", "PA-RG-62178-07 adjustment request record.pdf — An adjustment request record concerning Piotr Aldthwaite, dated 19 March 2026. It is a single page and is signed by the line manager.", "PA-RG-62178-03 bullying allegation evidence log.pdf — A bullying allegation evidence log concerning Piotr Aldthwaite, dated 2 May 2026. 3 pages, complete, and signed by the investigating officer.", "PA-RG-62178-02 grievance procedure acknowledgement.pdf — A grievance procedure acknowledgement concerning Piotr Aldthwaite, dated 4 April 2026. It is a single page and is signed by the HR case handler."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1053}} {"id": "isc-te-00368-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Zervwood & Co", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "1 September 2026"}, "checklist": ["Confirm that the bank charges and interest explanation sheet is included and signed.", "Confirm that the reviewer sign-off sheet for the reconciliation is included and signed.", "Confirm that the general ledger cash account listing is included.", "Confirm that the outstanding payments list is included.", "If the reconciliation shows an unexplained difference that is not an outstanding item, also confirm that the unexplained difference investigation note is included and signed.", "Confirm that the outstanding receipts list is included."], "submission": {"case": {"name": "company bank account PV-89003", "reference": "FU-96762", "details": ["The reconciliation shows an unexplained difference that is not an outstanding item."]}, "documents received": ["General ledger cash account listing - PV-89003. The listing is dated 17 May 2026. Pages 1 to 3 are included, and the total number of pages is not shown anywhere.", "Outstanding receipts list - PV-89003. The list is dated 13 August 2026 and is 1 page.", "Bank charges and interest explanation sheet - PV-89003. The sheet is dated 2 August 2026 and is 1 page. It is signed by the financial controller.", "Outstanding payments list - PV-89003. The list is dated 30 June 2026 and is 1 page.", "Reviewer sign-off sheet for the reconciliation - PV-89003. The sheet is dated 16 August 2026 and is 1 page. It is signed by the financial controller.", "Unexplained difference investigation note - PV-89003. The note is dated 9 August 2026, 2 pages, complete. It is signed by the financial controller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00433-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Yselburg Partners", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "1 April 2026"}, "checklist": ["Confirm the cost-benefit justification is included.", "Confirm the installation requirements note is included.", "Confirm the vendor quotation is included, issued within the last 3 months.", "Confirm the maintenance plan is included."], "submission": {"case": {"name": "equipment FH-21730", "reference": "QM-98274"}, "documents received": ["installation requirements note FH-21730.pdf — An installation requirements note for equipment FH-21730, dated 17 February 2026. 2 pages, complete.", "vendor quotation FH-21730.pdf — A vendor quotation for equipment FH-21730, dated 5 February 2026. 2 pages, complete.", "cost-benefit justification FH-21730.pdf — A cost-benefit justification for equipment FH-21730, dated 21 December 2025. 3 pages, complete.", "maintenance plan FH-21730.pdf — A maintenance plan for equipment FH-21730, dated 7 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 666}} {"id": "isc-te-00366-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Jorcrest Ltd", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "26 June 2026"}, "checklist": ["Outstanding advance clearance check, signed.", "Travel policy extract showing advance eligibility.", "Travel advance request form, signed.", "Costed trip estimate sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "Marek Arnwick", "reference": "WD-60422"}, "documents received": ["Travel advance request form for Marek Arnwick, dated 26 March 2026, one page. It is signed by Marek Arnwick.", "Outstanding advance clearance check for Marek Arnwick, dated 26 April 2026, one page. It is signed by the accounts payable reviewer.", "Employee bank detail confirmation for Marek Arnwick, dated 21 February 2026, one page. It is signed by Marek Arnwick.", "Personal loan application to a bank for Marek Arnwick, dated 26 March 2026, one page. It is signed by Marek Arnwick.", "Travel policy extract showing advance eligibility for Marek Arnwick, dated 9 April 2026, one page.", "Costed trip estimate sheet for Marek Arnwick, dated 9 June 2026, one page. It is signed by Marek Arnwick."]}}, "question": {"type": "choice", "instructions": "Your task is to determine whether the pack is complete when measured against the checklist. Go over every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. The answer is complete: every applicable line is met (extra documents do not matter). The answer is incomplete: at least one applicable line is not met. The answer is unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, as they may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-16", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 716}} {"id": "isc-te-00284-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Vaskridge plc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "7 May 2026"}, "checklist": ["Company tax registration certificate on file.", "Beneficial owner identification form on file, signed.", "Company statutes on file, signed.", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents.", "Proof of registered office address on file, issued within the last 3 months.", "Shareholder register extract on file, issued within the last 3 months."], "submission": {"case": {"name": "Wendshaw Limited", "reference": "ZW-66539", "details": ["The company has a non-resident beneficial owner."]}, "documents received": ["tax-reg-cert_wendshaw.pdf - Company tax registration certificate for Wendshaw Limited. Date of issue: 23 January 2026. 1 page.", "registered-office-proof_wendshaw.pdf - Proof of registered office address for Wendshaw Limited. Date of issue: 25 March 2026. 1 page.", "company-statutes_wendshaw.pdf - Company statutes for Wendshaw Limited. Date of issue: 10 April 2026. 12 pages, complete. Signed by the company secretary.", "bo-identification-form_wendshaw.pdf - Beneficial owner identification form for Wendshaw Limited. Date of issue: 19 March 2026. 3 pages, complete. Signed by the beneficial owner.", "shareholder-register_wendshaw.pdf - Shareholder register extract for Wendshaw Limited. Date of issue: 14 March 2026. 2 pages, complete.", "board-resolution_wendshaw.pdf - Board resolution to open the account for Wendshaw Limited. Date of issue: 26 April 2026. 1 page. Signed by the directors."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 784}} {"id": "isc-te-00102-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Elvcrest Ltd", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "7 May 2026"}, "checklist": ["Proof of registered office address, issued within the last 3 months", "Authorised signer identity document, valid (not expired) on the date of the review", "Board resolution to open the account, signed", "Beneficial owner identification form, signed", "Company tax registration certificate", "Certificate of incorporation"], "submission": {"case": {"name": "Pentlund GmbH", "reference": "WW-71385"}, "documents received": ["Beneficial owner identification form for Pentlund GmbH. Date of issue: 17 January 2026. 3 pages, complete. Signed by the authorised signer.", "Company tax registration certificate for Pentlund GmbH. Date of issue: 29 April 2026. Single page.", "Authorised signer identity document for Pentlund GmbH. Expiry date: 27 July 2025. Single page.", "Proof of registered office address for Pentlund GmbH. Date of issue: 25 March 2026. Single page.", "Company statutes for Pentlund GmbH. Date of issue: 12 January 2026. 12 pages, complete. Signed by the managing director.", "Certificate of incorporation for Pentlund GmbH. Date of issue: 2 March 2026. Single page.", "Board resolution to open the account for Pentlund GmbH. Date of issue: 6 February 2026. Signed by the chair of the board. Single page."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "expired before the review", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-50", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 736}} {"id": "isc-te-00152-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ilvstow GmbH", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "23 July 2026"}, "checklist": ["If the trip involves travel to a country requiring a visa, also: visa approval letter", "trip cost estimate (signed)", "If the traveller is not a passport holder of the destination country, also: work permit confirmation", "passport copy for international travel (valid (not expired) on the date of the review)", "hotel booking confirmation", "line manager approval (signed)"], "submission": {"case": {"name": "business trip JD-97425", "reference": "DE-41048", "details": ["The trip involves no country requiring a visa.", "The traveller is not a passport holder of the destination country."]}, "cover note": "I am sorry that this pack was put together in a rush, and I apologise for any inconvenience this may cause.", "documents received": ["File: trip cost estimate JD-97425. A trip cost estimate for business trip JD-97425, dated 3 June 2026. It is 1 page and carries a signature from the line manager.", "File: hotel booking confirmation JD-97425. A hotel booking confirmation for business trip JD-97425, dated 21 April 2026. 2 pages, complete.", "File: passport copy JD-97425.pdf. A passport copy for international travel for business trip JD-97425, showing an expiry date of 9 August 2026. It is 1 page.", "File: visa entry requirement printout JD-97425. A visa entry requirement printout for business trip JD-97425, dated 5 May 2026. 2 pages, complete.", "File: line manager approval JD-97425. A line manager approval for business trip JD-97425, dated 16 May 2026. It is 1 page and is signed by the line manager.", "File: work permit confirmation JD-97425. A work permit confirmation for business trip JD-97425, dated 21 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 884}} {"id": "isc-te-00142-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Maldwick Limited", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "25 March 2026"}, "checklist": ["Two-factor authentication confirmation, issued within the last 3 months.", "Content escalation route, signed.", "Account purpose statement.", "Platform terms acceptance record, signed.", "Naming convention approval, signed."], "submission": {"case": {"name": "new social media account YK-40400", "reference": "WH-23864"}, "documents received": ["YK-40400_document_4.pdf. A two-factor authentication confirmation for new social media account YK-40400, dated 8 January 2026. It is a single page.", "YK-40400_account_closure_procedure.pdf. An account closure procedure for new social media account YK-40400, dated 28 November 2025. It is a single page.", "YK-40400_platform_terms_acceptance_record.pdf. A platform terms acceptance record for new social media account YK-40400, dated 16 March 2026. This single page is signed by the social media manager.", "YK-40400_account_purpose_statement.pdf. An account purpose statement for new social media account YK-40400, dated 2 January 2026. It is a single page.", "YK-40400_content_escalation_route.pdf. A content escalation route for new social media account YK-40400, dated 7 December 2025. This single page is signed by the social media manager.", "YK-40400_naming_convention_approval.pdf. A naming convention approval for new social media account YK-40400, dated 30 December 2025. This single page is signed by the social media manager.", "YK-40400_admin_access_list.pdf. An admin access list for new social media account YK-40400, dated 21 March 2026. It is a single page.", "YK-40400_document_5.pdf. A two-factor authentication confirmation for new social media account YK-40400, dated 27 March 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete: every applicable line is met (extra documents do not matter). Answer incomplete: at least one applicable line is not met. Answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-13", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 936}} {"id": "isc-te-00420-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ebrfield plc", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "10 September 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed", "Anti-bribery policy statement, signed", "Supplier declaration of no conflicts of interest, signed", "Certificate of incorporation", "Supplier registration form, signed"], "submission": {"case": {"name": "Maldcrest Partners", "reference": "LF-56948", "details": ["The supplier is a foreign company."]}, "documents received": ["Certificate of incorporation - Maldcrest Partners.pdf\nA certificate of incorporation for Maldcrest Partners, dated 19 May 2026. It is 2 pages, complete.", "Bank details confirmation letter - Maldcrest Partners.pdf\nA single-page bank details confirmation letter for Maldcrest Partners, dated 14 August 2026. It is signed by a bank officer.", "Supplier registration form - Maldcrest Partners.pdf\nA supplier registration form for Maldcrest Partners, dated 3 June 2026. It is 3 pages, complete, and signed by a director of Maldcrest Partners.", "Certified translation of the certificate of incorporation - Maldcrest Partners.pdf\nA certified translation of the certificate of incorporation for Maldcrest Partners, dated 12 August 2026. It is 2 pages, complete, and signed by a certified translator.", "Anti-bribery policy statement - Maldcrest Partners.pdf\nAn anti-bribery policy statement for Maldcrest Partners, dated 18 August 2026. It is 2 pages, complete, and signed by a director of Maldcrest Partners.", "Supplier declaration of no conflicts of interest - Maldcrest Partners.pdf\nA single-page supplier declaration of no conflicts of interest for Maldcrest Partners, dated 4 July 2026. It is signed by a director of Maldcrest Partners."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide. Review each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Give complete if every applicable line is met (extra documents do not matter). Give incomplete if at least one applicable line is not met. Give unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-25", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00281-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Brenfell Group", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "31 August 2026"}, "checklist": ["Confirmation of contact details, issued within the last 3 months", "Account statement showing recent activity, issued within the last 1 months", "Delivery address confirmation, signed", "Signature verification record, signed", "Lost card declaration, signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed"], "submission": {"case": {"name": "Siobhan Thornmore", "reference": "HK-69511", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["Confirmation of contact details in the name of Siobhan Thornmore, dated 13 July 2026. Single page.", "Delivery address confirmation for Siobhan Thornmore, dated 21 July 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Note about a damaged card in the name of Siobhan Thornmore, dated 9 August 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Temporary overseas address registration form for Siobhan Thornmore, dated 5 June 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "File scan_010.pdf: the scan is blank, so its contents cannot be seen.", "Signature verification record for Siobhan Thornmore, dated 22 August 2026. Single page. Signed by the bank officer who carried out the verification.", "Lost card declaration for Siobhan Thornmore, dated 9 August 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Account statement showing recent activity for Siobhan Thornmore, dated 29 August 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00039-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Iskton GmbH", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "29 July 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include: mediation request confirmation (issued within the last 1 months, signed)", "original service agreement copy", "breach evidence log (issued within the last 1 months, signed)", "cure period expiry calculation (issued within the last 1 months, signed)", "litigation hold notice (issued within the last 1 months, signed)", "default notice previously served (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Ovarfeld Ltd", "reference": "BZ-18824"}, "documents received": ["Litigation hold notice for Ovarfeld Ltd, issued 27 July 2026. 2 pages, complete. Signed by the general counsel.", "Original service agreement copy for Ovarfeld Ltd, dated 31 May 2026. 10 pages, complete.", "Breach evidence log for Ovarfeld Ltd, issued 20 July 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Default notice previously served on Ovarfeld Ltd, dated 6 June 2026. Single page. Signed by the contracts manager.", "Losses calculation statement for Ovarfeld Ltd, issued 25 July 2026. 3 pages, complete. Signed by the finance manager.", "Cure period expiry calculation for Ovarfeld Ltd, issued 20 July 2026. 2 pages, complete. Signed by the contracts manager."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide if it is complete. Check every checklist line that is applicable to this case. A required document only counts if it is the kind of document that the checklist lists (not a similar kind), if it is about the subject of the case, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the review date, and if it was issued within the period the checklist allows. A conditional line applies only in cases where its circumstance holds. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves instead.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-56", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 766}} {"id": "isc-te-00023-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Aldvik Limited", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "17 August 2026"}, "checklist": ["Engineer F-gas handling certificate, valid (not expired) on the date of the review.", "Engineer's service report, issued within the last 1 months, signed.", "Asset condition photograph sheet, issued within the last 1 months.", "Plant room access sign-in sheet.", "F-gas leak check record, issued within the last 12 months, signed.", "System pressure test results, issued within the last 1 months, signed."], "submission": {"case": {"name": "air conditioning system TH-31121", "reference": "TH-69673"}, "documents received": ["F-gas leak check record for air conditioning system TH-31121, issued on 10 November 2025. 2 pages, complete. Signed by the attending engineer.", "Engineer F-gas handling certificate for air conditioning system TH-31121, showing an expiry date of 13 March 2027. Single page.", "Plant room access sign-in sheet for air conditioning system TH-31121, issued on 31 July 2026. Single page.", "Asset condition photograph sheet for air conditioning system TH-31121, issued on 3 August 2026. 2 pages, complete.", "System pressure test results for air conditioning system TH-31121, issued on 1 August 2026. Pages 1 to 2 are included, with the total number of pages not shown anywhere on the document. Signed by the test engineer.", "Engineer's service report for air conditioning system TH-31121, issued on 6 August 2026. 3 pages, complete. Signed by the service engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00113-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Xanwald SAS", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "24 June 2026"}, "checklist": ["System pressure test results, issued within the last 1 months, signed", "If the system contains more than 5 tonnes of refrigerant, also: fixed leak detection test certificate, issued within the last 6 months, signed", "Plant room access sign-in sheet", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "Thermostat calibration certificate, issued within the last 12 months", "Asset condition photograph sheet, issued within the last 1 months"], "submission": {"case": {"name": "air conditioning system PS-44263", "reference": "MV-14815", "details": ["The system contains more than 5 tonnes of refrigerant."]}, "documents received": ["PS-44263_engineer_F_gas_handling_certificate_20102028.pdf. Engineer F-gas handling certificate for air conditioning system PS-44263, showing an expiry date of 20 October 2028. 1 page.", "File_MV-14815_008.pdf. The file will not open, so its contents cannot be seen.", "PS-44263_plant_room_access_sign_in_sheet_120526.pdf. Plant room access sign-in sheet for air conditioning system PS-44263, dated 12 May 2026. 1 page.", "PS-44263_thermostat_calibration_certificate_160725.pdf. Thermostat calibration certificate for air conditioning system PS-44263, dated 16 July 2025. 1 page.", "PS-44263_asset_condition_photograph_sheet_030626.pdf. Asset condition photograph sheet for air conditioning system PS-44263, dated 3 June 2026. 2 pages, complete.", "PS-44263_fixed_leak_detection_test_certificate_010226.pdf. Fixed leak detection test certificate for air conditioning system PS-44263, dated 1 February 2026. 2 pages, complete. Signed by the leak detection engineer.", "PS-44263_refrigerant_top_up_log_140626.pdf. Refrigerant top-up log for air conditioning system PS-44263, dated 14 June 2026. 1 page. Signed by the attending refrigeration engineer.", "PS-44263_system_pressure_test_results_070626.pdf. System pressure test results for air conditioning system PS-44263, dated 7 June 2026. 2 pages, complete. Signed by the commissioning engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1024}} {"id": "isc-te-00035-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Elvshaw Inc", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "1 September 2026"}, "checklist": ["Fit-out cost estimate, issued within the last 6 months and signed", "Pilot operation audit report, issued within the last 6 months and signed", "Franchise application form, signed", "Franchise disclosure document receipt, issued within the last 3 months and signed"], "submission": {"case": {"name": "Eskmouth GmbH", "reference": "WJ-35437"}, "documents received": ["Eskmouth_GmbH_pilot_operation_audit_report.pdf — Pilot operation audit report for Eskmouth GmbH, dated 2 May 2026. 8 pages, complete. Signed by the franchisor's operations auditor.", "Eskmouth_GmbH_franchise_application_form.pdf — Franchise application form for Eskmouth GmbH, dated 18 June 2026. 3 pages, complete. Signed by the managing director of Eskmouth GmbH.", "Eskmouth_GmbH_franchise_disclosure_document_receipt.pdf — Franchise disclosure document receipt for Eskmouth GmbH, dated 2 August 2026. 1 page. Signed by the managing director of Eskmouth GmbH.", "Eskmouth_GmbH_franchise_agreement_counterpart.pdf — Signed franchise agreement counterpart for Eskmouth GmbH, dated 14 July 2026. 12 pages, complete. Signed by the franchisor's legal counsel and the managing director of Eskmouth GmbH.", "Eskmouth_GmbH_fit-out_cost_estimate.pdf — Fit-out cost estimate for Eskmouth GmbH, dated 15 May 2026. 4 pages, complete. Signed by the franchisor's head of construction."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00121-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jundmoor Partners", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "4 August 2026"}, "checklist": ["Drying contractor's certificate of completion, issued within the last 6 months and signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Buildings insurance policy schedule", "Council flood warning notice, issued within the last 12 months", "Flood claim form, signed"], "submission": {"case": {"name": "property KX-91092", "reference": "OX-34504"}, "documents received": ["d3_buildings_insurance_policy_schedule_KX91092.pdf — Buildings insurance policy schedule for property KX-91092, dated 13 May 2026. 5 pages, complete.", "d6_newspaper_clipping_KX91092.pdf — Newspaper clipping about flooding in another town, concerning property KX-91092, dated 1 March 2026. 1 page.", "d7_loss_adjusters_inspection_report_KX91092.pdf — Loss adjuster's inspection report for property KX-91092, dated 8 May 2026. 6 pages, complete. Signed by the loss adjuster.", "d4_council_flood_warning_notice_KX91092.pdf — Council flood warning notice for property KX-91092, dated 1 March 2026. 1 page.", "d5_flood_claim_form_KX91092.pdf — Flood claim form for property KX-91092, dated 9 April 2026. 5 pages, complete. Signed by the claimant.", "d8_debris_removal_invoice_KX91092.pdf — Debris removal invoice for property KX-91092, dated 16 May 2026. 1 page.", "d2_photographs_of_flood_water_in_the_rooms_KX91092.pdf — Photographs of flood water in the rooms at property KX-91092, dated 19 July 2026. 3 pages, complete.", "d1_drying_contractors_certificate_of_completion_KX91092.pdf — Drying contractor's certificate of completion for property KX-91092, dated 17 May 2026. 2 pages, complete. Signed by the drying contractor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 945}} {"id": "isc-te-00181-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Wynstead Inc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "26 May 2026"}, "checklist": ["Leaver notification form, signed", "Shared mailbox handover record, issued within the last 1 month, signed", "Service desk ticket closure summary, issued within the last 1 month", "Line manager confirmation, issued within the last 1 month, signed", "Final payroll cut-off note, issued within the last 1 month, signed"], "submission": {"case": {"name": "James Fitzford", "reference": "IF-45020"}, "documents received": ["shared_mailbox_handover_record.pdf. This shared mailbox handover record for James Fitzford is dated 12 May 2026 and runs to 2 pages, complete. It is signed by the shared mailbox owner.", "farewell_email_from_colleague.pdf. This email from a colleague wishing James Fitzford well is dated 20 May 2026 and is a single page. It carries the colleague's signature.", "line_manager_confirmation.pdf. This line manager confirmation for James Fitzford is dated 20 May 2026 and is a single page. It is signed by the line manager.", "service_desk_ticket_closure_summary.pdf. This service desk ticket closure summary for James Fitzford is dated 13 May 2026 and runs to 3 pages, complete.", "non_disclosure_reminder_acknowledgement.pdf. This non-disclosure reminder acknowledgement for James Fitzford is dated 27 March 2026 and is a single page. It is signed by the leaver.", "leaver_notification_form.pdf. This leaver notification form for James Fitzford is dated 1 February 2026 and runs to 2 pages, complete. It is signed by the line manager.", "final_payroll_cutoff_note.pdf. This final payroll cut-off note for James Fitzford is dated 8 May 2026 and is a single page. It is signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 825}} {"id": "isc-te-00465-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Zalddale Group", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "13 July 2026"}, "checklist": ["Prerequisite certificate included", "If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "Employer sponsorship letter included (issued within the last 3 months, signed)", "Course booking form included (signed)", "Payment confirmation included (issued within the last 3 months)", "If the delegate requires an adjusted learning plan, also: learning support agreement (signed)"], "submission": {"case": {"name": "course booking BS-25601", "reference": "KW-27021", "details": ["The course leads to a licensed qualification.", "The delegate requires an adjusted learning plan."]}, "cover note": "Please could you approve this pack as quickly as possible. Everything in it is in order, so it should be ready to go straight through.", "documents received": ["licence_eligibility_declaration_BS-25601.pdf. A single-page licence eligibility declaration for course booking BS-25601, issued on 21 June 2026, signed by the delegate.", "employer_sponsorship_letter_BS-25601.pdf. A single-page employer sponsorship letter for course booking BS-25601, issued on 25 April 2026, signed by the employer's authorised signatory.", "course_booking_form_BS-25601.pdf. A course booking form for course booking BS-25601, issued on 3 April 2026. 2 pages, complete, signed by the delegate.", "learning_support_agreement_BS-25601.pdf. A single-page learning support agreement for course booking BS-25601, issued on 19 March 2026, signed by the course tutor.", "cancellation_policy_acceptance_BS-25601.pdf. A single-page cancellation policy acceptance for course booking BS-25601, issued on 27 May 2026, signed by the delegate.", "payment_confirmation_BS-25601.pdf. A single-page payment confirmation for course booking BS-25601, issued on 3 May 2026.", "venue_access_instructions_BS-25601.pdf. A single-page set of venue access instructions for course booking BS-25601, issued on 3 June 2026."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Step through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete if every applicable line is met (extra documents do not matter). Reply incomplete if at least one applicable line is not met. Reply unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, which may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-27", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 931}} {"id": "isc-te-00258-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Orrgard Limited", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "20 April 2026"}, "checklist": ["Data protection impact assessment, issued within the last 12 months and signed.", "Merchant account agreement, signed.", "Test environment transaction log, issued within the last 1 months.", "Penetration test summary, issued within the last 6 months and signed.", "Go-live sign-off certificate, issued within the last 1 months and signed.", "Fraud screening configuration sheet, signed."], "submission": {"case": {"name": "payment gateway KK-52797", "reference": "ZJ-99275"}, "cover note": "Please could you approve this quickly, as all the paperwork is in order. Happy to answer any questions in the meantime.", "documents received": ["Penetration test summary for payment gateway KK-52797, dated 17 November 2025. 3 pages, complete. Signed by the penetration tester.", "Test environment transaction log for payment gateway KK-52797, dated 12 April 2026. Pages 1 to 4 are included and the total number of pages is not shown anywhere.", "Merchant account agreement for payment gateway KK-52797, dated 28 December 2025. 6 pages, complete. Signed by the Payments Director.", "Data protection impact assessment for payment gateway KK-52797, dated 6 January 2026. 5 pages, complete. Signed by the Data Protection Officer.", "Fraud screening configuration sheet for payment gateway KK-52797, dated 4 January 2026. Single page. Signed by the Fraud Prevention Lead.", "Go-live sign-off certificate for payment gateway KK-52797, dated 12 April 2026. Single page. Signed by the Head of Payments."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 805}} {"id": "isc-te-00358-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Kestlock Ltd", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "4 August 2026"}, "checklist": ["Check that the expense claim form is signed.", "Check that the train ticket receipt is present.", "Check that the currency conversion statement was issued within the last 6 months.", "If the claim includes mileage for use of a private car, also check that the mileage log is signed.", "Check that the boarding pass stub is present.", "Check that the taxi fare receipt was issued within the last 6 months."], "submission": {"case": {"name": "Emre Tibins", "reference": "QF-77856", "details": ["The claim includes no private car mileage."]}, "documents received": ["expense_claim_form_complete_QF-77856.pdf — Expense claim form about Emre Tibins, dated 4 June 2026. All 2 of its 2 pages are included (2 pages, complete). Signed by the claiming employee.", "currency_conversion_statement_QF-77856.pdf — Currency conversion statement about Emre Tibins, dated 30 June 2026. It is a single page.", "taxi_fare_receipt_QF-77856.pdf — Taxi fare receipt about Emre Tibins, dated 8 July 2026. It is a single page.", "boarding_pass_stub_QF-77856.pdf — Boarding pass stub about Emre Tibins, dated 7 April 2026. It is a single page.", "train_ticket_receipt_QF-77856.pdf — Train ticket receipt about Emre Tibins, dated 28 July 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 759}} {"id": "isc-te-00039-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Iskton GmbH", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "29 July 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include: mediation request confirmation (issued within the last 1 months, signed)", "original service agreement copy", "breach evidence log (issued within the last 1 months, signed)", "cure period expiry calculation (issued within the last 1 months, signed)", "litigation hold notice (issued within the last 1 months, signed)", "default notice previously served (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Ovarfeld Ltd", "reference": "BZ-18824"}, "documents received": ["Original service agreement copy for Ovarfeld Ltd, dated 31 May 2026. 10 pages, complete.", "Litigation hold notice for Ovarfeld Ltd, issued 27 July 2026. 2 pages, complete. Signed by the general counsel.", "Losses calculation statement for Ovarfeld Ltd, issued 25 July 2026. 3 pages, complete. Signed by the finance manager.", "Cure period expiry calculation for Ovarfeld Ltd, issued 20 July 2026. 2 pages, complete. Signed by the contracts manager.", "Breach evidence log for Ovarfeld Ltd, issued 20 July 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Default notice previously served on Ovarfeld Ltd, dated 6 June 2026. Single page. Signed by the contracts manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 748}} {"id": "isc-te-00429-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Ilvgate & Co", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "20 July 2026"}, "checklist": ["Rent book or rent payment schedule, issued within the last 2 months.", "Proof of identity, valid (not expired) on the date of the review.", "Proof of national insurance number.", "If the claimant is living in temporary accommodation arranged by the council, also: temporary accommodation placement letter.", "Recent bank statements, issued within the last 2 months.", "Benefit claim form, valid (not expired) on the date of the review, signed.", "Current tenancy agreement, signed."], "submission": {"case": {"name": "Joseph Wolmini", "reference": "UI-33074", "details": ["The claimant is living in temporary accommodation arranged by the council."]}, "cover note": "I am sorry that this pack was put together in a rush. Please let me know if you need anything further.", "documents received": ["proof_of_ni_number_wolmini_ui33074.pdf — Proof of national insurance number relating to Joseph Wolmini. It shows a date of issue of 10 April 2026. Single page.", "proof_of_identity_wolmini_ui33074.pdf — Proof of identity relating to Joseph Wolmini. It shows an expiry date of 11 June 2027. Single page.", "benefit_claim_form_wolmini_ui33074.pdf — Benefit claim form relating to Joseph Wolmini. It shows an expiry date of 29 April 2028. 12 pages, complete. It is signed by the claimant, Joseph Wolmini.", "tenancy_agreement_wolmini_ui33074.pdf — Current tenancy agreement relating to Joseph Wolmini. It shows a date of issue of 17 April 2026. 12 pages, complete. It is signed by the claimant and the landlord.", "proof_of_earnings_wolmini_ui33074.pdf — Proof of earnings relating to Joseph Wolmini. It shows a date of issue of 11 July 2026. 2 pages, complete.", "rent_book_wolmini_ui33074.pdf — Rent book or rent payment schedule relating to Joseph Wolmini. It shows a date of issue of 22 June 2026. 4 pages, complete.", "temporary_accommodation_placement_letter_wolmini_ui33074.pdf — Temporary accommodation placement letter relating to Joseph Wolmini. It shows a date of issue of 7 June 2026. 2 pages, complete.", "bank_statements_wolmini_ui33074.pdf — Recent bank statements relating to Joseph Wolmini. They show a date of issue of 8 June 2026. 12 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1002}} {"id": "isc-te-00041-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Creskheim & Co", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "23 April 2026"}, "checklist": ["Company registration certificate.", "Trade references letter, issued within the last 3 months, signed.", "Credit reference agency report, issued within the last 3 months.", "If the customer is a newly incorporated company, also: director identification record, signed.", "Bank reference letter, issued within the last 6 months, signed.", "Signed credit terms agreement, signed.", "Credit limit approval memo, issued within the last 1 months, signed.", "If the customer requests a credit limit above the standard cap, also: finance director sanction letter, issued within the last 1 months, signed."], "submission": {"case": {"name": "Ivrfeld & Co", "reference": "QG-16044", "details": ["The customer is a newly incorporated company.", "The customer requests a credit limit above the standard cap."]}, "documents received": ["Signed credit terms agreement for Ivrfeld & Co. Date of issue: 1 January 2026. 4 pages, complete. Signed by the customer.", "Finance director sanction letter for Ivrfeld & Co. Date of issue: 5 April 2026. Single page. Signed by the finance director.", "Credit reference agency report for Ivrfeld & Co. Date of issue: 17 April 2026. 6 pages, complete.", "Bank reference letter for Bravmark Ltd. Date of issue: 2 April 2026. Single page. Signed by the bank manager.", "Credit limit approval memo for Ivrfeld & Co. Date of issue: 14 April 2026. Single page. Signed by the credit manager.", "Director identification record for Ivrfeld & Co. Date of issue: 5 January 2026. 2 pages, complete. Signed by a director.", "Trade references letter for Ivrfeld & Co. Date of issue: 3 April 2026. Single page. Signed by the referee.", "Company registration certificate for Ivrfeld & Co. Date of issue: 23 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 866}} {"id": "isc-te-00244-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Elstley plc", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 June 2026"}, "checklist": ["Travel request form, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Travel policy acknowledgement, signed.", "Hotel booking confirmation.", "Passport copy for international travel, valid (not expired) on the date of the review."], "submission": {"case": {"name": "business trip CM-86741", "reference": "KC-24296", "details": ["The trip involves no country requiring a visa."]}, "documents received": ["CM-86741_travel_request_form.pdf. Travel request form for business trip CM-86741, issued 3 May 2026. Signed by the traveller, 2 pages, complete.", "CM-86741_passport_copy.pdf. Passport copy for international travel for business trip CM-86741, single page. The passport expires 10 December 2028.", "CM-86741_travel_policy_acknowledgement.pdf. Travel policy acknowledgement for business trip CM-86741, issued 21 May 2026. Signed by the traveller, single page.", "CM-86741_hotel_booking_confirmation.pdf. Hotel booking confirmation for business trip CM-86741, issued 28 February 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 711}} {"id": "isc-te-00248-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Aldston BV", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "27 July 2026"}, "checklist": ["benefit entitlement letters issued within the last 12 months", "support plan, signed", "safeguarding referral form issued within the last 12 months, signed", "If the adult lacks capacity to make the decision about their care arrangements, also: best interests decision record, signed", "capacity assessment record, signed", "recent bank statements issued within the last 3 months", "proof of identity valid (not expired) on the date of the review"], "submission": {"case": {"name": "Elena Lundton", "reference": "VW-56695", "details": ["The adult lacks capacity to make the decision about their care arrangements."]}, "documents received": ["Recent bank statements. The document concerns Elena Lundton and shows its date of issue as 21 June 2026. 8 pages, complete.", "Best interests decision record. The document concerns Elena Lundton and shows its date of issue as 5 July 2026. 4 pages, complete. It is signed by the best interests assessor.", "Safeguarding referral form. The document concerns Elena Lundton and shows its date of issue as 23 December 2025. 2 pages, complete. It is signed by the safeguarding lead officer.", "Benefit entitlement letters. The document concerns Elena Lundton and shows its date of issue as 19 July 2026. 2 pages, complete.", "Proof of identity. The document concerns Elena Lundton and shows its expiry date as 10 November 2027. It is a single page.", "Capacity assessment record. The document concerns Elena Lundton and shows its date of issue as 9 April 2026. 4 pages, complete. It is signed by the capacity assessor.", "Support plan. The document concerns Elena Lundton and shows its date of issue as 20 April 2026. Pages 1 to 4 are included and the total number of pages is not shown anywhere. It is signed by the care coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 858}} {"id": "isc-te-00238-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Austmouth Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "11 August 2026"}, "checklist": ["If the borrower is self-employed, also: two most recent tax year overviews (issued within the last 18 months, signed)", "passport (valid (not expired) on the date of the review)", "gifted deposit letter (issued within the last 3 months, signed)", "mortgage application form (issued within the last 3 months, signed)", "three most recent payslips (issued within the last 3 months)"], "submission": {"case": {"name": "Charlotte Lovez", "reference": "OA-94851", "details": ["The borrower is not self-employed."]}, "documents received": ["Gifted deposit letter for Charlotte Lovez, dated 3 June 2026. Single page; the signature line is empty.", "Three most recent payslips for Charlotte Lovez, dated 7 August 2026. 3 pages, complete.", "Mortgage application form for Charlotte Lovez, dated 4 July 2026. 10 pages, complete, signed by the borrower.", "Passport for Charlotte Lovez, showing an expiry date of 15 December 2028. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 667}} {"id": "isc-te-00132-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravstow SAS", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "9 July 2026"}, "checklist": ["Transfer manifest, signed.", "Cross-dock slot booking sheet, issued within the last 1 months, signed.", "Damaged goods exception sheet, issued within the last 1 months, signed.", "Transfer completion confirmation, issued within the last 1 months, signed.", "Load consolidation sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "cross-dock transfer EQ-46599", "reference": "YF-29707"}, "cover note": "Everything needed is attached and complete. Please review and confirm. Thiago Elmham", "documents received": ["Transfer manifest for cross-dock transfer EQ-46599. Date of issue: 13 March 2026. 3 pages, complete. Signed by the transport planner.", "Load consolidation sheet for cross-dock transfer EQ-46599. Date of issue: 14 June 2026. 2 pages, complete. Signed by the load planner.", "Damaged goods exception sheet for cross-dock transfer EQ-46599. Date of issue: 27 June 2026. 1 page. Signed by the warehouse operator.", "Inbound unloading record for cross-dock transfer EQ-46599. Date of issue: 7 July 2026. 1 page. Signed by the inbound unloading supervisor.", "Cross-dock slot booking sheet for cross-dock transfer EQ-46599. Date of issue: 27 June 2026. 1 page. Signed by the cross-dock coordinator.", "Transfer completion confirmation for cross-dock transfer EQ-46599. The date of issue is covered by a stamp and cannot be read. 1 page. Signed by the cross-dock supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00285-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Glenvik Group", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "17 March 2026"}, "checklist": ["Check that the tax registration letter is included.", "Check that the bank account verification letter is included, that it was issued within the last 3 months, and that it is signed.", "Check that the authorised representative ID copy is included and that it is valid, meaning not expired, on the date of the review.", "Check that the product catalogue declaration is included and that it is signed.", "Check that the proof of trading address is included and that it was issued within the last 3 months.", "Check that the business registration certificate is included."], "submission": {"case": {"name": "Bolthurst Ltd", "reference": "KL-47468"}, "documents received": ["Authorised representative ID copy for Bolthurst Ltd, showing an expiry date of 20 December 2026. Single page.", "Tax registration letter for Bolthurst Ltd, dated 7 March 2026. Single page.", "Proof of trading address for Bolthurst Ltd, dated 10 March 2026. Single page.", "Bank account verification letter for Bolthurst Ltd, dated 5 January 2026. Signed by a bank officer. Single page.", "Business registration certificate for Bolthurst Ltd, dated 12 December 2025. Single page.", "Product catalogue declaration for Bolthurst Ltd, dated 30 November 2025. 4 pages, complete. Signed by the authorised representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 735}} {"id": "isc-te-00390-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Abrton Inc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "4 March 2026"}, "checklist": ["If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed", "liability claim form, signed", "public liability insurance schedule", "CCTV footage stills of the incident, issued within the last 3 months", "witness statement from a staff member, signed", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed", "photographs of the spillage on the floor, issued within the last 1 months", "cleaning log for the day of the incident, issued within the last 6 months and signed"], "submission": {"case": {"name": "Marlfeld GmbH", "reference": "IL-48734", "details": ["The customer is handling the claim personally.", "The injured customer did not go to hospital."]}, "documents received": ["cleaning log for the day of the incident - Marlfeld GmbH.pdf. Cleaning log for the day of the incident about Marlfeld GmbH, dated 12 October 2025. Single page. Signed by the cleaner on duty that day.", "public liability insurance schedule - Marlfeld GmbH.pdf. Public liability insurance schedule about Marlfeld GmbH, dated 13 December 2025. 4 pages, complete.", "witness statement from a staff member - Marlfeld GmbH.pdf. Witness statement from a staff member about Marlfeld GmbH, dated 14 January 2026. Single page. Signed by the staff member who made the statement.", "incident report from the day - Marlfeld GmbH.pdf. Incident report from the day about Marlfeld GmbH, dated 4 February 2026. 2 pages, complete. Signed by the duty manager.", "liability claim form - Marlfeld GmbH.pdf. Liability claim form about Marlfeld GmbH, dated 10 December 2025. 3 pages, complete. Signed by the customer.", "CCTV footage stills of the incident - Marlfeld GmbH.pdf. CCTV footage stills of the incident about Marlfeld GmbH, dated 25 December 2025. 2 pages, complete.", "photographs of the spillage on the floor - Marlfeld GmbH.pdf. Photographs of the spillage on the floor about Marlfeld GmbH, dated 16 February 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 950}} {"id": "isc-te-00459-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Mersstead Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "14 August 2026"}, "checklist": ["Sales invoice or receipt for the sale proceeds, issued within the last 3 months", "Asset disposal request form, signed", "If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer, issued within the last 3 months", "Fixed asset register extract for the asset", "Depreciation schedule for the asset to date"], "submission": {"case": {"name": "disposed asset LV-4099", "reference": "IW-81554", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Written offer or valuation for the asset for disposed asset LV-4099. Date of issue: 5 June 2026. 2 pages, complete.", "Sales invoice or receipt for the sale proceeds for disposed asset LV-4099. Date of issue: 10 August 2026. 1 page.", "Asset disposal request form for disposed asset LV-4099. Date of issue: 27 May 2026. 2 pages, complete. Signed by the budget holder.", "Fixed asset register extract for the asset for disposed asset LV-4099. Date of issue: 3 June 2026. 1 page.", "Depreciation schedule for the asset to date for disposed asset LV-4099. Date of issue: 16 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 736}} {"id": "isc-te-00153-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jorwell Partners", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "22 May 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Travel request form (signed)", "Passport copy for international travel (valid (not expired) on the date of the review)", "Flight itinerary quote (issued within the last 1 months)", "Visa entry requirement printout (issued within the last 3 months)", "Trip cost estimate (signed)", "Travel policy acknowledgement (signed)"], "submission": {"case": {"name": "business trip SC-57627", "reference": "VR-75039", "details": ["The traveller is not a passport holder of the destination country."]}, "documents received": ["Work permit confirmation for business trip SC-57627. Dated 30 April 2026. 2 pages, complete.", "Travel request form for business trip SC-57627. Dated 3 April 2026. 2 pages, complete. Signed by the traveller.", "Flight itinerary quote for business trip SC-57627. Dated 18 May 2026. 2 pages, complete.", "Hotel booking confirmation for business trip SC-57627. Dated 30 March 2026. 2 pages, complete.", "Passport copy for international travel for business trip SC-57627. Passport expiry date: 22 November 2027. Single page.", "Travel policy acknowledgement for business trip SC-57627. Dated 2 February 2026. Single page. Signed by the traveller.", "Visa entry requirement printout for business trip SC-57627. Dated 15 May 2026. 2 pages, complete.", "Trip cost estimate for business trip SC-57627. Dated 10 April 2026. Single page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every line of the checklist that applies here. A required document only counts if it is the type of document listed (not a similar type), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it had not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-1", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 842}} {"id": "isc-te-00228-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lindcourt & Co", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "15 May 2026"}, "checklist": ["Training matrix extract, issued within the last 3 months, signed.", "Calibration status summary, issued within the last 1 months, signed.", "Layout tour plan, signed.", "Audit scope statement, signed.", "Audit agenda, signed.", "Document control list, issued within the last 3 months, signed."], "submission": {"case": {"name": "customer audit visit HY-50028", "reference": "PO-24718"}, "documents received": ["HY-50028_document_control_list.pdf. Document control list for customer audit visit HY-50028, dated 20 March 2026. 4 pages, complete, but a sticky note covers the signature block, so it cannot be seen whether it is signed.", "HY-50028_audit_agenda.pdf. Audit agenda for customer audit visit HY-50028, dated 28 March 2026. Single page, with a signature from the Quality Manager.", "HY-50028_layout_tour_plan.pdf. Layout tour plan for customer audit visit HY-50028, dated 8 February 2026. Single page, with a signature from the Facilities Supervisor.", "HY-50028_audit_scope_statement.pdf. Audit scope statement for customer audit visit HY-50028, dated 7 March 2026. Single page, with a signature from the Quality Manager.", "HY-50028_calibration_status_summary.pdf. Calibration status summary for customer audit visit HY-50028, dated 5 May 2026. 2 pages, complete, with a signature from the Quality Manager.", "HY-50028_training_matrix_extract.pdf. Training matrix extract for customer audit visit HY-50028, dated 12 May 2026. 3 pages, complete, with a signature from the Training Coordinator."]}}, "question": {"type": "choice", "instructions": "Your task is to determine whether the pack is complete when measured against the checklist. Go over every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. The answer is complete: every applicable line is met (extra documents do not matter). The answer is incomplete: at least one applicable line is not met. The answer is unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, as they may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-16", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00424-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ambside & Co", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "15 May 2026"}, "checklist": ["visa entry requirement printout, issued within the last 3 months", "flight itinerary quote, issued within the last 1 months", "line manager approval, signed", "If the trip involves travel to a country requiring a visa, also: visa approval letter", "trip cost estimate, signed", "passport copy for international travel, valid (not expired) on the date of the review"], "submission": {"case": {"name": "business trip QQ-26801", "reference": "UK-40834", "details": ["The trip involves travel to a country requiring a visa."]}, "documents received": ["flight_itinerary_quote_QQ-26801.pdf. This is a flight itinerary quote for business trip QQ-26801, showing a date of issue of 1 May 2026. 2 pages, complete.", "travel_request_form_QQ-26801.pdf. This is a travel request form for business trip QQ-26801, showing a date of issue of 27 March 2026. 2 pages, complete. It is signed by the employee.", "line_manager_approval_QQ-26801.pdf. This is a line manager approval for business trip QQ-26801, showing a date of issue of 29 January 2026. It is a single page, signed by the line manager.", "passport_copy_QQ-26801.pdf. This is a passport copy for international travel for business trip QQ-26801, showing an expiry date of 19 September 2027. It is a single page.", "trip_cost_estimate_QQ-26801.pdf. This is a trip cost estimate for business trip QQ-26801, showing a date of issue of 6 April 2026. It is a single page, signed by the travel coordinator.", "visa_entry_requirement_printout_QQ-26801.pdf. This is a visa entry requirement printout for business trip QQ-26801, showing a date of issue of 3 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The decision required is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-67", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 894}} {"id": "isc-te-00001-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Lunburg GmbH", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "25 August 2026"}, "checklist": ["Line manager confirmation, issued within the last 1 months, signed", "Equipment return receipt, issued within the last 1 months, signed", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed", "Shared mailbox handover record, issued within the last 1 months, signed", "Non-disclosure reminder acknowledgement, signed", "Access rights inventory, issued within the last 1 months"], "submission": {"case": {"name": "Sarah Harvham", "reference": "KE-21974", "details": ["The leaver held no privileged administrator accounts."]}, "documents received": ["Line manager confirmation - Sarah Harvham.pdf. A line manager confirmation concerning Sarah Harvham, dated 4 August 2026. It is 1 page and is signed by the line manager.", "Access rights inventory - Sarah Harvham.pdf. An access rights inventory concerning Sarah Harvham, dated 20 August 2026. It is 4 pages, complete.", "Scan 08.pdf. The file will not open, so its contents cannot be seen.", "Contract of employment - Sarah Harvham.pdf. A copy of the employee's original contract of employment concerning Sarah Harvham, dated 23 July 2026. It is 1 page and is signed by the HR manager.", "Leaver notification form - Sarah Harvham.pdf. A leaver notification form concerning Sarah Harvham, dated 30 May 2026. It is 2 pages, complete, and is signed by the line manager.", "Equipment return receipt - Sarah Harvham.pdf. An equipment return receipt concerning Sarah Harvham, dated 10 August 2026. It is 1 page and is signed by the IT asset coordinator.", "Shared mailbox handover record - Sarah Harvham.pdf. A shared mailbox handover record concerning Sarah Harvham, dated 8 August 2026. It is 2 pages, complete, and is signed by the receiving mailbox owner.", "Non-disclosure reminder acknowledgement - Sarah Harvham.pdf. A non-disclosure reminder acknowledgement concerning Sarah Harvham, dated 23 July 2026. It is 1 page and is signed by the departing employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 917}} {"id": "isc-te-00346-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Garnford Limited", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "15 September 2026"}, "checklist": ["If the complaint alleges a member of staff behaved rudely, also: staff member written response (signed)", "policy breach summary (issued within the last 3 months, signed)", "proposed resolution letter draft (signed)", "store incident report (issued within the last 3 months, signed)", "complaint escalation form (issued within the last 1 months, signed)", "If the complaint involves a data protection concern, also: data protection impact note (issued within the last 1 months, signed)", "complaint category code sheet"], "submission": {"case": {"name": "escalated complaint HJ-70397", "reference": "FT-75575", "details": ["The complaint makes no allegation about staff behaviour.", "The complaint involves a data protection concern."]}, "documents received": ["proposed_resolution_letter_draft_HJ-70397.pdf - A proposed resolution letter draft relating to escalated complaint HJ-70397. Date of issue: 20 August 2026. 2 pages, complete. Signed by the Head of Customer Relations.", "complaint_category_code_sheet_HJ-70397.pdf - A complaint category code sheet relating to escalated complaint HJ-70397. Date of issue: 1 September 2026. Single page.", "data_protection_impact_note_HJ-70397.pdf - A data protection impact note relating to escalated complaint HJ-70397. Date of issue: 28 August 2026. 2 pages, complete. Signed by the Data Protection Officer.", "returns_policy_HJ-70397.pdf - A copy of the returns policy relating to escalated complaint HJ-70397. Date of issue: 14 July 2026. 2 pages, complete. Signed by the Store Manager.", "store_incident_report_HJ-70397.pdf - A store incident report relating to escalated complaint HJ-70397. Date of issue: 5 July 2026. 2 pages, complete. Signed by the Duty Store Manager.", "complaint_escalation_form_HJ-70397.pdf - A complaint escalation form relating to escalated complaint HJ-70397. Date of issue: 1 September 2026. 2 pages, complete. Signed by the Customer Relations Team Leader."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The verdict complete: every applicable line is met (extra documents do not matter). The verdict incomplete: at least one applicable line is not met. The verdict unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-21", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 956}} {"id": "isc-te-00306-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Xanmore Ltd", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "1 September 2026"}, "checklist": ["Training course completion certificate, issued within the last 12 months.", "Signed franchise agreement counterpart.", "Funding agreement from a lender, issued within the last 3 months and signed.", "If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement, valid (not expired) on the date of the review and signed.", "Pilot operation audit report, issued within the last 6 months and signed.", "Fit-out cost estimate, issued within the last 6 months and signed."], "submission": {"case": {"name": "Norvham Limited", "reference": "IK-49788", "details": ["The franchise territory does not include premises in a shopping centre."]}, "documents received": ["Funding agreement from a lender, issued 16 June 2026, concerning Norvham Limited. 6 pages, complete. Signed by the lender's loan officer and by a director of Norvham Limited.", "Franchise application form, issued 18 August 2026, concerning Norvham Limited. 3 pages, complete. Signed by a director of Norvham Limited.", "Pilot operation audit report, issued 11 July 2026, concerning Norvham Limited. 8 pages, complete. Signed by the lead auditor.", "Training course completion certificate, issued 9 July 2026, concerning Norvham Limited. Single page.", "Signed franchise agreement counterpart, issued 1 July 2026, concerning Norvham Limited. 12 pages, complete. Signed by a director of Norvham Limited and by the franchisor's authorised signatory.", "Bank letter confirming an appointment with an advisor, issued 16 June 2026, concerning Norvham Limited. 6 pages, complete. Signed by the bank advisor.", "Fit-out cost estimate, issued 12 April 2026, concerning Norvham Limited. 4 pages, complete. Signed by the fit-out contractor's estimator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 848}} {"id": "isc-te-00280-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Yarvham Limited", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "4 May 2026"}, "checklist": ["Board resolution to open the account, signed", "Company tax registration certificate", "Proof of registered office address, issued within the last 3 months", "If the company operates in a cash-intensive trade, also: cash handling policy, signed", "Authorised signer identity document, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Lombham Partners", "reference": "JE-39716", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["A scanned proof of registered office address for Lombham Partners, issued on 15 April 2026. It is 1 page.", "A scanned company statutes document for Lombham Partners, issued on 9 January 2026. It is 12 pages, complete, and signed by the company secretary.", "A scanned company tax registration certificate for Lombham Partners, issued on 6 January 2026. It is 1 page.", "A scanned authorised signer identity document for Lombham Partners, with an expiry date of 15 August 2028. It is 1 page.", "A scanned cash handling policy for Lombham Partners, dated 31 March 2026. It is 2 pages, complete, and signed by the managing director.", "A scanned shareholder register extract for Lombham Partners, issued on 24 April 2026. It is 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 735}} {"id": "isc-te-00015-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Ambford Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "15 May 2026"}, "checklist": ["Cancellation policy acceptance, signed", "Employer sponsorship letter, issued within the last 3 months, signed", "Special requirements note", "Venue access instructions, issued within the last 3 months", "Prerequisite certificate"], "submission": {"case": {"name": "course booking WJ-95480", "reference": "PQ-38702"}, "documents received": ["file-0008.pdf. This file will not open, so its contents cannot be seen.", "venue-access-instructions-WJ-95480.pdf. Venue access instructions for course booking WJ-95480, issued on 6 April 2026. It is 1 page.", "cancellation-policy-acceptance-WJ-95480.pdf. A cancellation policy acceptance for course booking WJ-95480, issued on 2 February 2026. It is 1 page and signed by the delegate.", "prerequisite-certificate-WJ-95480.pdf. A prerequisite certificate for course booking WJ-95480, issued on 18 January 2026. It is 1 page.", "delegate-photo-identification-WJ-95480.pdf. Delegate photo identification for course booking WJ-95480, with an expiry date of 22 February 2028. It is 1 page.", "employer-sponsorship-letter-WJ-95480.pdf. An employer sponsorship letter for course booking WJ-95480, issued on 2 March 2026. It is 1 page and signed by the employer's human resources manager.", "special-requirements-note-WJ-95480.pdf. A special requirements note for course booking WJ-95480, issued on 3 February 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00317-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Brenwyn Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "20 August 2026"}, "checklist": ["Obtain a financial stability statement, issued within the last 12 months and signed.", "Obtain a raw material certificate of analysis, issued within the last 6 months and signed.", "Obtain a supplier self-assessment report, issued within the last 12 months and signed.", "Obtain a supplier audit report, issued within the last 24 months and signed.", "Obtain a supplier capacity declaration, issued within the last 12 months and signed.", "Obtain a supplier quality questionnaire, issued within the last 12 months and signed."], "submission": {"case": {"name": "Haskbury BV", "reference": "CB-19498"}, "documents received": ["Haskbury_BV_Raw_Material_CoA.pdf - Raw material certificate of analysis for Haskbury BV, dated 8 April 2026. 2 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Capacity_Declaration.pdf - Supplier capacity declaration for Haskbury BV, dated 18 September 2025. 2 pages, complete. Signed by the supplier's operations director.", "Haskbury_BV_Self_Assessment_Report.pdf - Supplier self-assessment report for Haskbury BV, dated 3 August 2026. 6 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Supplier_Audit_Report_April_2024.pdf - Supplier audit report for Haskbury BV, dated 25 April 2024. 8 pages, complete. Signed by the lead auditor.", "Haskbury_BV_Financial_Stability_Statement.pdf - Financial stability statement for Haskbury BV, dated 21 May 2026. 2 pages, complete. Signed by the chief financial officer of Haskbury BV.", "Haskbury_BV_Quality_Questionnaire.pdf - Supplier quality questionnaire for Haskbury BV, dated 2 October 2025. 4 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 864}} {"id": "isc-te-00050-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Wilmmouth Ltd", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "19 June 2026"}, "checklist": ["Account purpose statement is included.", "Signed platform terms acceptance record is included.", "Signed account request form is included.", "Two-factor authentication confirmation is included, issued within the last 3 months.", "If the account will post content about financial products, also: financial promotions approval note, issued within the last 3 months and signed."], "submission": {"case": {"name": "new social media account JE-72058", "reference": "TC-88544", "details": ["The account will not post any content about financial products."]}, "documents received": ["Content escalation route for new social media account JE-72058. Dated 17 May 2026 and signed by the social media governance lead. Single page.", "Two-factor authentication confirmation for new social media account JE-72058. Dated 10 June 2026. Single page.", "Account purpose statement for new social media account JE-72058. Dated 17 March 2026. Single page.", "Platform terms acceptance record for new social media account JE-72058. Dated 17 April 2026 and signed by the social media manager. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 686}} {"id": "isc-te-00309-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Jarlmoor plc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "8 May 2026"}, "checklist": ["Asbestos survey report issued within the last 12 months", "Stamp duty return, signed", "Keys handover receipt, signed", "Company search report issued within the last 1 months", "Energy performance certificate valid (not expired) on the date of the review", "If the tenant is a newly formed company, also: signed parent company guarantee", "Guarantor consent letter, signed"], "submission": {"case": {"name": "premises GN-45739", "reference": "GN-17663", "details": ["The tenant is a newly formed company."]}, "documents received": ["signed_draft_lease_GN-45739.pdf - Signed draft lease for premises GN-45739. Date of issue: 8 April 2026. 12 pages, complete. Signed by the landlord and the tenant.", "keys_handover_receipt_GN-45739.pdf - Keys handover receipt for premises GN-45739. Date of issue: 18 February 2026. 1 page. Signed by the landlord.", "signed_parent_company_guarantee_GN-45739.pdf - Signed parent company guarantee for premises GN-45739. Date of issue: 1 May 2026. 3 pages, complete. Signed by the parent company.", "company_search_report_GN-45739.pdf - Company search report for premises GN-45739. Date of issue: 21 April 2026. 2 pages, complete.", "guarantor_consent_letter_GN-45739.pdf - Guarantor consent letter for premises GN-45739. Date of issue: 24 March 2026. 1 page. Signed by the guarantor.", "asbestos_survey_report_GN-45739.pdf - Asbestos survey report for premises GN-45739. Date of issue: 3 August 2025. 4 pages, complete.", "energy_performance_certificate_GN-45739.pdf - Energy performance certificate for premises GN-45739. Expiry date: 28 November 2026. 1 page.", "stamp_duty_return_GN-45739.pdf - Stamp duty return for premises GN-45739. Date of issue: 14 March 2026. 2 pages, complete. Signed by the tenant.", "title_information_document_GN-45739.pdf - Title information document for premises GN-45739. Date of issue: 1 February 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "The question to answer is whether the pack stands complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "variant-63", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1012}} {"id": "isc-te-00320-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Hondwick plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "9 September 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "If the account will be run by an external agency, also: agency access agreement (signed)", "Account request form (signed)", "Account purpose statement", "Naming convention approval (signed)", "Platform terms acceptance record (signed)"], "submission": {"case": {"name": "new social media account ZP-18379", "reference": "MR-88769", "details": ["The account will be run by an external agency."]}, "documents received": ["Account request form - ZP-18379.pdf. An account request form for new social media account ZP-18379, dated 23 June 2026, on a single page. It is signed by the requesting marketing manager.", "Platform terms acceptance record - ZP-18379.pdf. A platform terms acceptance record for new social media account ZP-18379, dated 24 August 2026, on a single page. It is signed by the account administrator.", "Account purpose statement - ZP-18379.pdf. An account purpose statement for new social media account ZP-18379, dated 14 July 2026. It is a single page.", "Naming convention approval - ZP-18379.pdf. A naming convention approval for new social media account ZP-18379, dated 5 August 2026, on a single page. It is signed by the social media governance lead.", "Content escalation route - ZP-18379.pdf. A content escalation route for new social media account ZP-18379, dated 27 August 2026, on a single page. It is signed by the social media governance lead.", "Agency access agreement - ZP-18379.pdf. An agency access agreement for new social media account ZP-18379, dated 15 August 2026. 2 pages, complete. It is signed by the agency's account director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 876}} {"id": "isc-te-00416-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Ulmberg LLP", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "2 June 2026"}, "checklist": ["Insurance notification letter, issued within the last 6 months", "Meter reading photo, issued within the last 1 months", "Survey booking form, signed", "Grid connection application, issued within the last 12 months, signed", "Scaffolding agreement, signed", "Energy performance certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "roof UO-80504", "reference": "IC-49989"}, "documents received": ["meter-reading-photo.pdf. This is a single-page meter reading photo for roof UO-80504, dated 17 May 2026.", "insurance-notification-letter.pdf. This is a single-page insurance notification letter for roof UO-80504, dated 2 March 2026.", "scaffolding-agreement.pdf. This is a scaffolding agreement for roof UO-80504, dated 18 March 2026. 2 pages, complete. It is signed by the scaffolding contractor.", "survey-booking-form.pdf. This is a single-page survey booking form for roof UO-80504, dated 14 April 2026. It is signed by the customer.", "energy-performance-certificate.pdf. This is an energy performance certificate for roof UO-80504 with an expiry date of 23 October 2026. 3 pages, complete.", "grid-connection-application.pdf. This is a grid connection application for roof UO-80504, dated 22 May 2026. 2 pages, complete. It is signed by the customer.", "ladder-safety-leaflet.pdf. This is a ladder safety leaflet for roof UO-80504, dated 18 March 2026. 2 pages, complete. It is signed by the site supervisor.", "roof-structural-report.pdf. This is a roof structural report for roof UO-80504, dated 22 May 2026. 4 pages, complete. It is signed by the surveyor."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide. Go through each checklist line that applies to this case. Only count a required document if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-64", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00410-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Faldmark Ltd", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "27 August 2026"}, "checklist": ["Check that the IT equipment loan form is present and signed.", "Check that the placement learning plan is present and signed.", "Check that the internship agreement is present and signed.", "Check that the confidentiality undertaking is present and signed.", "If the internship is paid, also check that the payroll registration form is present and signed.", "Check that the right to work check record is present, signed, and issued within the last 6 months."], "submission": {"case": {"name": "Carmen Radton", "reference": "DN-88378", "details": ["The internship is paid."]}, "documents received": ["Payroll registration form for Carmen Radton, dated 21 August 2026. 2 pages, complete. Signed by the payroll officer.", "Internship agreement for Carmen Radton, dated 8 June 2026. 4 pages, complete. Signed by the marketing manager.", "Placement learning plan for Carmen Radton, dated 10 May 2026. 2 pages, complete. Signed by the marketing supervisor.", "Confidentiality undertaking for Carmen Radton, dated 10 August 2026. 2 pages, complete. Signed by Carmen Radton.", "IT equipment loan form for Carmen Radton, dated 15 August 2026. Single page. Signed by the IT manager.", "Emergency contact form for Carmen Radton, dated 2 May 2026. Single page.", "Right to work check record for Carmen Radton, dated 29 March 2026. Single page. Signed by the HR officer."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete: every applicable line is met (extra documents do not matter). Reply incomplete: at least one applicable line is not met. Reply unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-15", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 773}} {"id": "isc-te-00103-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Pravness plc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "12 March 2026"}, "checklist": ["If the company operates in a cash-intensive trade, also: cash handling policy (signed)", "company tax registration certificate", "authorised signer identity document (valid (not expired) on the date of the review)", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents", "company statutes (signed)", "certificate of incorporation", "beneficial owner identification form (signed)", "shareholder register extract (issued within the last 3 months)"], "submission": {"case": {"name": "Maldwald LLP", "reference": "NL-50519", "details": ["The company does not operate in a cash-intensive trade.", "All beneficial owners of the company are residents."]}, "documents received": ["Certificate of incorporation for Maldwald LLP, dated 13 January 2026. Single page.", "Beneficial owner identification form for Maldwald LLP, dated 11 February 2026. 3 pages, complete. Signed by a beneficial owner.", "Authorised signer identity document for Maldwald LLP, showing an expiry date of 9 January 2027. Single page.", "Shareholder register extract for Maldwald LLP, dated 5 February 2026. 2 pages, complete.", "Company tax registration certificate for Maldwald LLP, dated 18 December 2025. Single page.", "Company statutes for Maldwald LLP, dated 24 January 2026. 12 pages, complete. The last page is cropped, so the signature block cannot be seen and it is not known whether the document is signed.", "Proof of registered office address for Maldwald LLP, dated 17 February 2026. Single page."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "signature not visible", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 593}} {"id": "isc-te-00421-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Briskcliff LLP", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "3 June 2026"}, "checklist": ["Travel policy acknowledgement, signed.", "Line manager approval, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Trip cost estimate, signed.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Travel request form, signed."], "submission": {"case": {"name": "business trip WR-16880", "reference": "LV-18491", "details": ["The trip involves no country requiring a visa."]}, "cover note": "Please could you approve this as quickly as possible, as all the paperwork is in order. Many thanks, Elena.", "documents received": ["Line manager approval for business trip WR-16880, issued 16 March 2026. Single page. Signed by the line manager.", "Travel policy acknowledgement for business trip WR-16880, issued 2 May 2026. Single page. Signed by the employee.", "Passport copy for international travel for business trip WR-16880. Expiry date 27 August 2027. Single page.", "Travel request form for business trip HO-15280, issued 9 February 2026. 2 pages, complete. Signed by the employee.", "Trip cost estimate for business trip WR-16880, issued 29 April 2026. Single page. Signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 734}} {"id": "isc-te-00126-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Ulmwood Limited", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "7 May 2026"}, "checklist": ["Title information document.", "Asbestos survey report, issued within the last 12 months.", "Signed keys handover receipt.", "Company search report, issued within the last 1 months.", "Signed draft lease.", "Signed stamp duty return."], "submission": {"case": {"name": "premises KE-13480", "reference": "VJ-73666"}, "documents received": ["Energy performance certificate for premises KE-13480, expiring 14 February 2028. Single page.", "Stamp duty return for premises KE-13480, dated 7 January 2026. 2 pages, complete, signed by the tenant's solicitor.", "Unapproved heads of terms for premises KE-13480, dated 2 February 2026. 12 pages, complete, signed by the landlord and the proposed tenant.", "Company search report for premises KE-13480, dated 18 April 2026. 2 pages, complete.", "Asbestos survey report for premises KE-13480, dated 20 September 2025. 4 pages, complete.", "Title information document for premises KE-13480, dated 29 January 2026. 3 pages, complete.", "Keys handover receipt for premises KE-13480, dated 25 February 2026. Single page, signed by the landlord's representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 743}} {"id": "isc-te-00252-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Belmfell LLP", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "12 May 2026"}, "checklist": ["Facility access application form, signed", "Photo identity document, valid (not expired) on the date of the review", "Home institution endorsement letter, issued within the last 6 months and signed", "Radiation safety training certificate, issued within the last 24 months and signed", "Beam time or instrument booking confirmation", "Host scientist invitation letter, issued within the last 6 months and signed"], "submission": {"case": {"name": "Pieter Grubfield", "reference": "IS-40676"}, "documents received": ["Radiation safety training certificate - Grubfield.pdf. A radiation safety training certificate for Pieter Grubfield, issued on 23 October 2024. Single page, signed by the training provider.", "Photo identity document - Grubfield.pdf. A photo identity document for Pieter Grubfield showing an expiry date of 20 September 2027. Single page.", "Insurance declaration for facility work - Grubfield.pdf. An insurance declaration for facility work for Pieter Grubfield, dated 5 April 2026. Single page, signed by the applicant.", "Beam time confirmation - Grubfield.pdf. A beam time or instrument booking confirmation for Pieter Grubfield, dated 4 March 2026. Single page.", "Host scientist invitation letter - Grubfield.pdf. A host scientist invitation letter for Pieter Grubfield, issued on 16 January 2026. Single page, signed by the host scientist.", "Home institution endorsement letter - Grubfield 19 Nov 2025.pdf. A home institution endorsement letter for Pieter Grubfield, issued on 19 November 2025. Single page, signed by the head of department.", "Facility access application form - Grubfield.pdf. A facility access application form for Pieter Grubfield, dated 13 April 2026. 2 pages, complete. It is signed by the applicant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 846}} {"id": "isc-te-00355-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Baxmere Limited", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "4 August 2026"}, "checklist": ["Vehicle condition report, signed", "Driving licence, valid (not expired) on the date of the review, signed", "Passport, valid (not expired) on the date of the review, signed", "Credit card in the driver's name, valid (not expired) on the date of the review, signed"], "submission": {"case": {"name": "Orla Fitzard", "reference": "GK-82009"}, "documents received": ["A scanned credit card in the driver's name of Orla Fitzard, showing an expiry date of 9 February 2027. Single page. The card is signed by the cardholder.", "A scanned passport in the name of Orla Fitzard, showing an expiry date of 14 November 2027. Single page. The passport is signed by the bearer.", "A scanned driving licence in the name of Orla Fitzard, showing an expiry date of 3 May 2028. 2 pages, complete. The licence is signed by the licence holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 643}} {"id": "isc-te-00456-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Stromstow Partners", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "2 April 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed", "Employee bank detail confirmation, issued within the last 6 months and signed", "Travel advance request form, signed", "Travel policy extract showing advance eligibility", "If the trip involves travel to another country, also: foreign travel authorisation from a director, signed", "Outstanding advance clearance check, signed", "Line manager approval for the advance, signed"], "submission": {"case": {"name": "Sophie Moskini", "reference": "RK-62728", "details": ["The trip is wholly within the home country."]}, "documents received": ["Employee_Bank_Detail_Confirmation_SM_01112025.pdf — Employee bank detail confirmation for Sophie Moskini, dated 1 November 2025. Single page. Signed by Sophie Moskini.", "Costed_Trip_Estimate_Sheet_SM_14032026.pdf — Costed trip estimate sheet for Sophie Moskini, dated 14 March 2026. Single page. Signed by Sophie Moskini.", "Travel_Policy_Extract_Advance_Eligibility_SM_27012026.pdf — Travel policy extract showing advance eligibility for Sophie Moskini, dated 27 January 2026. Single page.", "Trip_Itinerary_and_Approval_SM_30032026.pdf — Trip itinerary and approval for Sophie Moskini, dated 30 March 2026. 2 pages, complete. Signed by the line manager.", "File_0003_SM.pdf — The file will not open, so its contents cannot be seen.", "Outstanding_Advance_Clearance_Check_SM_26122025.pdf — Outstanding advance clearance check for Sophie Moskini, dated 26 December 2025. Single page. Signed by an accounts payable reviewer.", "Line_Manager_Approval_Advance_SM_03032026.pdf — Line manager approval for the advance for Sophie Moskini, dated 3 March 2026. Single page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 883}} {"id": "isc-te-00323-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Bravbury plc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "20 March 2026"}, "checklist": ["Confirm the pack contains the brand colour specification", "Confirm the pack contains the waste disposal plan", "Confirm the pack contains the kit contents list", "Confirm the pack contains a signed point of sale design proof"], "submission": {"case": {"name": "merchandising kit TQ-71056", "reference": "ZM-22416"}, "cover note": "Please accept my apologies for the pack, which was assembled in a rush. I hope everything you need is there.", "documents received": ["A kit contents list for merchandising kit TQ-71056, dated 14 December 2025. 2 pages, complete.", "A store installation guide for merchandising kit TQ-71056, dated 15 February 2026. 6 pages, complete.", "A brand colour specification for merchandising kit TQ-71056, dated 27 December 2025. It is a single page.", "A point of sale design proof for merchandising kit TQ-71056, dated 29 December 2025. 4 pages, complete. It has been signed by the brand manager.", "A waste disposal plan for merchandising kit TQ-71056, dated 4 December 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 722}} {"id": "isc-te-00437-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Faldcourt & Co", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "5 August 2026"}, "checklist": ["Complaint escalation form, issued within the last 1 month and signed", "Proposed resolution letter draft, signed", "Customer contact log, issued within the last 3 months", "Policy breach summary, issued within the last 3 months and signed", "Original complaint record, issued within the last 6 months"], "submission": {"case": {"name": "escalated complaint BO-70275", "reference": "JZ-82529"}, "documents received": ["Complaint escalation form for escalated complaint BO-70275, dated 15 July 2026. 2 pages, complete. Signed by the customer relations team lead.", "Store incident report for escalated complaint BO-70275, dated 17 July 2026. 2 pages, complete. Signed by the store manager.", "Customer contact log for escalated complaint BO-70275, dated 16 May 2026. 3 pages, complete.", "Original complaint record for escalated complaint BO-70275, dated 7 June 2026. 2 pages, complete.", "Proposed resolution letter draft for escalated complaint BO-70275, dated 25 April 2026. 2 pages, complete. Signed by the customer relations manager.", "Policy breach summary for escalated complaint BO-70275, dated 13 June 2026. 2 pages, complete. Signed by the compliance officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 746}} {"id": "isc-te-00463-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Jorwick & Co", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "5 August 2026"}, "checklist": ["Obtain a shareholder register extract issued within the last 3 months.", "Obtain a signed board resolution to open the account.", "Obtain a signed beneficial owner identification form.", "Obtain a proof of registered office address issued within the last 3 months."], "submission": {"case": {"name": "Kaldvik Inc", "reference": "KZ-84732"}, "documents received": ["proof_of_registered_office_address_Kaldvik_Inc.pdf. Proof of registered office address for Kaldvik Inc, dated 1 August 2026. Single page.", "beneficial_owner_identification_form_Kaldvik_Inc.pdf. Beneficial owner identification form for Kaldvik Inc, dated 31 July 2026. 3 pages, complete, signed by a director.", "company_statutes_Kaldvik_Inc.pdf. Company statutes for Kaldvik Inc, dated 19 May 2026. 12 pages, complete, signed by a director.", "board_resolution_Kaldvik_Inc.pdf. Board resolution to open the account for Kaldvik Inc, dated 13 April 2026. Single page, signed by the chair of the board.", "shareholder_register_extract_Kaldvik_Inc_partial.pdf. Shareholder register extract for Kaldvik Inc, dated 21 July 2026. Pages 1-1 of 2, so only 1 of 2 pages is included."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 728}} {"id": "isc-te-00490-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravness Group", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "14 July 2026"}, "checklist": ["Fire safety certificate: valid (not expired) on the date of the review", "Floor load capacity report: signed", "Utilities connection certificate", "Signed lease agreement: signed"], "submission": {"case": {"name": "warehouse MI-17904", "reference": "DQ-47245"}, "documents received": ["floor_load_capacity_report_MI-17904.pdf — Floor load capacity report for warehouse MI-17904. Date of issue: 18 April 2026. 3 pages, complete. Signed by the structural engineer.", "utilities_connection_certificate_MI-17904.pdf — Utilities connection certificate for warehouse MI-17904. Date of issue: 2 May 2026. Single page.", "signed_lease_agreement_MI-17904.pdf — Signed lease agreement for warehouse MI-17904. Date of issue: 14 June 2026. 8 pages, complete. Signed by the landlord and the tenant.", "fire_safety_certificate_MI-17904.pdf — Fire safety certificate for warehouse MI-17904. Expiry date: 1 January 2027. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 688}} {"id": "isc-te-00377-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Vornburg & Co", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "24 April 2026"}, "checklist": ["If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "venue access instructions (issued within the last 3 months)", "If the delegate requires an adjusted learning plan, also: learning support agreement (signed)", "payment confirmation (issued within the last 3 months)", "delegate photo identification (valid (not expired) on the date of the review)", "special requirements note", "cancellation policy acceptance (signed)"], "submission": {"case": {"name": "course booking UL-99308", "reference": "DD-21847", "details": ["The course leads to a licensed qualification.", "The delegate requires no adjusted learning plan."]}, "cover note": "I am not completely sure that everything needed is in here, so please let me know if anything is missing.", "documents received": ["Payment confirmation for course booking UL-99308, issued on 20 April 2026. Single page.", "Venue access instructions for course booking UL-99308, issued on 31 January 2026. Single page.", "Special requirements note for course booking UL-99308, issued on 21 January 2026. Single page.", "Prerequisite certificate for course booking UL-99308, issued on 1 February 2026. Single page.", "Delegate photo identification for course booking UL-99308. It shows an expiry date of 19 December 2027. Single page.", "Employer sponsorship letter for course booking UL-99308, issued on 27 March 2026. Single page. Signed by the sponsoring employer's HR manager.", "Cancellation policy acceptance for course booking UL-99308, issued on 25 February 2026. Single page. Signed by the delegate.", "Venue access instructions for course booking UL-99308, issued on 5 July 2024. Single page.", "Licence eligibility declaration for course booking UL-99308, issued on 4 April 2026. Single page. Signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 886}} {"id": "isc-te-00033-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Wendstead Limited", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "23 June 2026"}, "checklist": ["Loss adjuster's inspection report, issued within the last 6 months and signed", "Council flood warning notice, issued within the last 12 months", "Flood claim form, signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months"], "submission": {"case": {"name": "property SP-19466", "reference": "IK-48540"}, "cover note": "This pack has already been checked by a colleague before it reached you. Please review it as normal as part of the flood claims process.", "documents received": ["loss_adjuster_inspection_report_SP-19466.pdf - Loss adjuster's inspection report for property SP-19466, dated 16 January 2026. 6 pages, complete. Signed by the loss adjuster.", "utility_supplier_letter_SP-19466.pdf - Utility supplier's letter confirming the supply was cut off at property SP-19466, dated 18 January 2026. Single page.", "flood_claim_form_SP-19466_partial.pdf - Flood claim form for property SP-19466, dated 4 June 2026. 5 pages, complete. A sticky note covers the signature block, so it cannot be seen whether the form is signed.", "council_flood_warning_notice_SP-19466.pdf - Council flood warning notice for property SP-19466, dated 7 November 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 757}} {"id": "isc-te-00493-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Delvlund GmbH", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "6 August 2026"}, "checklist": ["Check that the signed credit terms agreement is included and signed.", "Check that the personal guarantee is included and signed.", "Check that the company registration certificate is included.", "Check that the bank reference letter is included, was issued within the last 6 months, and is signed.", "Check that the trade references letter is included, was issued within the last 3 months, and is signed.", "Check that the credit reference agency report is included and was issued within the last 3 months."], "submission": {"case": {"name": "Haskhurst Limited", "reference": "ZB-88049"}, "documents received": ["Signed credit terms agreement - Haskhurst Limited.pdf. Dated 7 June 2026, this signed credit terms agreement concerns Haskhurst Limited and is signed by the company's managing director. 4 pages, complete.", "Credit reference agency report - Haskhurst Limited.pdf. Dated 18 July 2026, this credit reference agency report concerns Haskhurst Limited. 6 pages, complete.", "Company registration certificate - Haskhurst Limited.pdf. Dated 20 April 2026, this company registration certificate concerns Haskhurst Limited. 2 pages, complete.", "Bank reference letter - Haskhurst Limited.pdf. Dated 3 August 2026, this bank reference letter concerns Haskhurst Limited and is a single page. The signature line is empty, so it is not signed.", "Personal guarantee - Haskhurst Limited.pdf. Dated 27 May 2026, this personal guarantee concerns Haskhurst Limited and is signed by the guarantor. 2 pages, complete.", "Trade references letter - Haskhurst Limited.pdf. Dated 22 July 2026, this trade references letter concerns Haskhurst Limited and is signed by the trade referee. 1 page."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Step through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete if every applicable line is met (extra documents do not matter). Reply incomplete if at least one applicable line is not met. Reply unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, which may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-27", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 824}} {"id": "isc-te-00031-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Mersham Ltd", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "24 August 2026"}, "checklist": ["Utility supplier's letter confirming the supply was cut off, issued within the last 12 months.", "Loss adjuster's inspection report, issued within the last 6 months and signed.", "Council flood warning notice, issued within the last 12 months.", "Photographs of flood water in the rooms, issued within the last 1 months.", "If the flood water reached the upper floor of the property, also: upper floor damage schedule, signed.", "If the property is a listed building, also: listed building consent for the repairs, signed.", "Flood claim form, signed."], "submission": {"case": {"name": "property FG-72212", "reference": "ZR-65260", "details": ["The flood water reached the upper floor of the property.", "The property is a listed building."]}, "documents received": ["Flood risk map printout for the area around property FG-72212, dated 1 May 2026. 5 pages, complete. Signed by the flood risk consultant.", "Utility supplier's letter confirming the supply was cut off at property FG-72212, dated 12 June 2026. 1 page.", "Upper floor damage schedule for property FG-72212, dated 28 May 2026. 3 pages, complete. Signed by the policyholder.", "Loss adjuster's inspection report on property FG-72212, dated 18 March 2026. 6 pages, complete. Signed by the loss adjuster.", "Drying contractor's certificate of completion for property FG-72212, dated 20 June 2026. 2 pages, complete. Signed by the drying contractor.", "Council flood warning notice for property FG-72212, dated 25 March 2026. 1 page.", "Debris removal invoice for property FG-72212, dated 30 July 2026. 1 page.", "Photographs of flood water in the rooms of property FG-72212, dated 20 August 2026. 3 pages, complete.", "Listed building consent for the repairs to property FG-72212, dated 18 May 2026. 2 pages, complete. Signed by the council planning officer."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Go through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 2, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "variant-49", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 945}} {"id": "isc-te-00212-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Austbury plc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "13 July 2026"}, "checklist": ["Public liability insurance schedule", "Witness statement from a staff member, signed", "Liability claim form, signed", "CCTV footage stills of the incident, issued within the last 3 months", "Incident report from the day, issued within the last 3 months, signed", "Staff training record for the duty manager, issued within the last 24 months, signed"], "submission": {"case": {"name": "Boltdale plc", "reference": "IQ-71848"}, "documents received": ["Liability claim form relating to Boltdale plc, dated 6 May 2026. 3 pages, complete, signed by the claimant.", "Staff training record for the duty manager relating to Boltdale plc, dated 31 August 2025. 2 pages, complete, signed by the duty manager.", "CCTV footage stills of the incident relating to Boltdale plc, dated 25 May 2026. 2 pages, complete.", "Public liability insurance schedule relating to Boltdale plc, dated 4 June 2026. 4 pages, complete.", "Incident report from the day relating to Boltdale plc, dated 1 May 2026. 2 pages, complete, signed by the duty manager.", "Witness statement from a staff member relating to Boltdale plc, dated 3 July 2026. Single page, signed by the staff member."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 736}} {"id": "isc-te-00271-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Ilvhurst SAS", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "23 March 2026"}, "checklist": ["Leaver notification form, signed", "Non-disclosure reminder acknowledgement, signed", "Final payroll cut-off note, signed, issued within the last 1 months", "Service desk ticket closure summary, issued within the last 1 months"], "submission": {"case": {"name": "Declan Vellridge", "reference": "QT-58639"}, "documents received": ["Payslip from an earlier month for Declan Vellridge, issued 10 March 2026. Single page. Signed by the payroll officer.", "Shared mailbox handover record for Declan Vellridge, issued 8 March 2026. 2 pages, complete. Signed by the line manager.", "Line manager confirmation for Declan Vellridge, issued 20 March 2026. Single page. Signed by the line manager.", "Final payroll cut-off note for Declan Vellridge, issued 10 March 2026. Single page. Signed by the payroll officer.", "Non-disclosure reminder acknowledgement for Declan Vellridge, issued 5 March 2026. Single page. Signed by the departing employee.", "Leaver notification form for Declan Vellridge, issued 30 November 2025. 2 pages, complete. Signed by the line manager.", "Service desk ticket closure summary for Declan Vellridge, issued 9 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 545}} {"id": "isc-te-00432-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Wynmark GmbH", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "14 September 2026"}, "checklist": ["Radiation safety training certificate, issued within the last 24 months and signed.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed.", "Photo identity document, valid (not expired) on the date of the review.", "Experiment safety clearance form, signed.", "Beam time or instrument booking confirmation."], "submission": {"case": {"name": "Noor Sabock", "reference": "VH-82380", "details": ["The researcher will work only during standard opening hours."]}, "documents received": ["Facility access application form for Noor Sabock, dated 24 June 2026, 2 pages, complete. It is signed by the facility user office administrator.", "Beam time or instrument booking confirmation for Noor Sabock, dated 8 August 2026, 1 page.", "Radiation safety training certificate for Noor Sabock, dated 6 April 2025, 1 page. It is signed by the radiation safety officer.", "Photo identity document for Noor Sabock showing an expiry date of 12 January 2026, 1 page.", "Experiment safety clearance form for Noor Sabock, dated 18 June 2026, 3 pages, complete. It is signed by the experiment safety coordinator.", "Home institution endorsement letter for Noor Sabock, dated 10 September 2026, 1 page. It is signed by the head of Noor Sabock's home institution department."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide if it is complete. Check every checklist line that is applicable to this case. A required document only counts if it is the kind of document that the checklist lists (not a similar kind), if it is about the subject of the case, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the review date, and if it was issued within the period the checklist allows. A conditional line applies only in cases where its circumstance holds. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves instead.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "expired before the review", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-56", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 768}} {"id": "isc-te-00285-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Glenvik Group", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "17 March 2026"}, "checklist": ["Check that the tax registration letter is included.", "Check that the bank account verification letter is included, that it was issued within the last 3 months, and that it is signed.", "Check that the authorised representative ID copy is included and that it is valid, meaning not expired, on the date of the review.", "Check that the product catalogue declaration is included and that it is signed.", "Check that the proof of trading address is included and that it was issued within the last 3 months.", "Check that the business registration certificate is included."], "submission": {"case": {"name": "Bolthurst Ltd", "reference": "KL-47468"}, "documents received": ["Anti-money laundering questionnaire for Bolthurst Ltd, dated 16 February 2026. 3 pages, complete. Signed by the authorised representative.", "Authorised representative ID copy for Bolthurst Ltd, showing an expiry date of 20 December 2026. Single page.", "Business registration certificate for Bolthurst Ltd, dated 12 December 2025. Single page.", "Bank account verification letter for Bolthurst Ltd, dated 5 January 2026. Signed by a bank officer. Single page.", "Tax registration letter for Bolthurst Ltd, dated 7 March 2026. Single page.", "Product catalogue declaration for Bolthurst Ltd, dated 30 November 2025. 4 pages, complete. Signed by the authorised representative."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist. Work through every checklist line that applies to this case. Only a document that is the kind listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows counts as satisfying a required document. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-48", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 744}} {"id": "isc-te-00127-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Selvgate Ltd", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "14 April 2026"}, "checklist": ["Funding agreement from a lender, issued within the last 3 months and signed", "Franchise disclosure document receipt, issued within the last 3 months and signed", "If the franchisee intends to operate through a company rather than as an individual, also: shareholder agreement extract, signed", "Operator licence, valid (not expired) on the date of the review", "Franchise application form, signed"], "submission": {"case": {"name": "Fennburg BV", "reference": "FA-82179", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "cover note": "Please find attached the pack for Fennburg BV, reference FA-82179. Everything needed is attached and complete. Kind regards, Michael Cadworth", "documents received": ["FA-82179_franchise_application_form_Fennburg_BV.pdf. A franchise application form concerning Fennburg BV, dated 26 January 2026, 3 pages, complete. It is signed by the franchisee's director.", "FA-82179_funding_agreement_Fennburg_BV.pdf. A funding agreement from a lender concerning Fennburg BV, dated 23 February 2026, 6 pages, complete. It is signed by the lender.", "FA-82179_pilot_operation_audit_report_Fennburg_BV.pdf. A pilot operation audit report concerning Fennburg BV, dated 24 February 2026, 8 pages, complete. It is signed by the auditor.", "FA-82179_franchise_disclosure_document_receipt_Fennburg_BV.pdf. A franchise disclosure document receipt concerning Fennburg BV, dated 12 February 2026, one page. It is signed by the franchisor's authorised officer.", "FA-82179_shareholder_agreement_extract_Fennburg_BV.pdf. A shareholder agreement extract concerning Fennburg BV, dated 11 March 2026, 4 pages, complete. It is signed by the company's shareholders.", "FA-82179_operator_licence_Fennburg_BV_1.pdf. An operator licence concerning Fennburg BV, 2 pages, complete. Its date of issue is obscured by a stamp across the corner."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 928}} {"id": "isc-te-00440-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vornshaw Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "26 June 2026"}, "checklist": ["Check that the pack contains the proposed architecture diagram.", "Check that the pack contains the review board feedback summary, issued within the last 3 months and signed.", "Check that the pack contains the security threat model, issued within the last 6 months.", "If the design introduces a new third-party dependency, also check that the pack contains the third-party dependency risk assessment, issued within the last 6 months and signed.", "Check that the pack contains the alternatives considered table.", "Check that the pack contains the cost estimate sheet, issued within the last 6 months."], "submission": {"case": {"name": "design document HR-11465", "reference": "YD-70116", "details": ["The design introduces no new third-party dependency."]}, "documents received": ["HR-11465 alternatives considered table 4 March 2026.pdf - Alternatives considered table about design document HR-11465, showing a date of issue of 4 March 2026. 2 pages, complete.", "HR-11465 cost estimate sheet 28 February 2026.pdf - Cost estimate sheet about design document HR-11465, showing a date of issue of 28 February 2026. 2 pages, complete.", "HR-11465 security threat model 28 April 2026.pdf - Security threat model about design document HR-11465, showing a date of issue of 28 April 2026. 4 pages, complete.", "HR-11465 review board feedback summary 17 May 2026.pdf - Review board feedback summary about design document HR-11465, showing a date of issue of 17 May 2026. 2 pages, complete. Signed by the architecture review board chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 825}} {"id": "isc-te-00463-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Jorwick & Co", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "5 August 2026"}, "checklist": ["Obtain a shareholder register extract issued within the last 3 months.", "Obtain a signed board resolution to open the account.", "Obtain a signed beneficial owner identification form.", "Obtain a proof of registered office address issued within the last 3 months."], "submission": {"case": {"name": "Kaldvik Inc", "reference": "KZ-84732"}, "documents received": ["shareholder_register_extract_Kaldvik_Inc_partial.pdf. Shareholder register extract for Kaldvik Inc, dated 21 July 2026. Pages 1-1 of 2, so only 1 of 2 pages is included.", "proof_of_registered_office_address_Kaldvik_Inc.pdf. Proof of registered office address for Kaldvik Inc, dated 1 August 2026. Single page.", "board_resolution_Kaldvik_Inc.pdf. Board resolution to open the account for Kaldvik Inc, dated 13 April 2026. Single page, signed by the chair of the board.", "beneficial_owner_identification_form_Kaldvik_Inc.pdf. Beneficial owner identification form for Kaldvik Inc, dated 31 July 2026. 3 pages, complete, signed by a director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 686}} {"id": "isc-te-00130-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Halvness LLP", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "22 April 2026"}, "checklist": ["Trade references letter, issued within the last 3 months, signed", "Company registration certificate", "Bank reference letter, issued within the last 6 months, signed", "Personal guarantee, signed"], "submission": {"case": {"name": "Pravmark GmbH", "reference": "EM-15224"}, "documents received": ["Bank reference letter for Pravmark GmbH, dated 24 December 2025. 1 page. Signed by the bank's relationship manager.", "Credit limit approval memo for Pravmark GmbH, dated 2 April 2026. 1 page. Signed by the credit manager.", "Company registration certificate for Pravmark GmbH, dated 5 January 2026. 2 pages, complete.", "Trade references letter for Pravmark GmbH, dated 15 February 2026. 1 page. Signed by the referee's accounts manager."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide. Go through each checklist line that applies to this case. Only count a required document if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-64", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 611}} {"id": "isc-te-00274-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Vasklund GmbH", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "19 June 2026"}, "checklist": ["Asset register update, issued within the last 1 months", "Data wipe certificate, issued within the last 3 months, signed", "Final backup confirmation, issued within the last 3 months, signed", "Data migration confirmation, issued within the last 3 months, signed", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed", "Licence reassignment note, issued within the last 3 months, signed"], "submission": {"case": {"name": "retired server PX-71814", "reference": "WW-93737", "details": ["The server holds archived records that must be kept."]}, "documents received": ["Final backup confirmation for retired server PX-71814, dated 27 April 2026, 1 page, signed by the backup administrator.", "Network disconnection confirmation for retired server PX-71814, dated 13 June 2026, 1 page, signed by the network administrator.", "Data wipe certificate for retired server PX-71814, dated 12 May 2026, 1 page, signed by the data sanitisation technician.", "Licence reassignment note for retired server PX-71814, dated 1 April 2026, 1 page, signed by the licence manager.", "Data migration confirmation for retired server PX-71814, dated 16 April 2026, 2 pages, complete, signed by the migration lead.", "Asset register update for retired server PX-71814, dated 29 May 2026, 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 790}} {"id": "isc-te-00431-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Ebrbrook GmbH", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "12 May 2026"}, "checklist": ["Cost-benefit justification included", "Vendor quotation included, issued within the last 3 months", "Grant fund eligibility note included, issued within the last 6 months and signed", "Equipment purchase request form included and signed", "Three quotes comparison sheet included, issued within the last 3 months and signed"], "submission": {"case": {"name": "equipment OZ-94072", "reference": "EK-69340"}, "documents received": ["Vendor quotation for equipment OZ-94072. Dated 8 March 2026. 2 pages, complete.", "Grant fund eligibility note for equipment OZ-94072. Dated 14 February 2026. 1 page. Signed by the grants officer.", "Maintenance plan for equipment OZ-94072. Dated 21 January 2026. 2 pages, complete.", "Equipment purchase request form for equipment OZ-94072. Dated 5 February 2026. 2 pages, complete. Signed by the department head.", "Budget spreadsheet for the whole department, covering equipment OZ-94072. Dated 1 March 2026. 3 pages, complete.", "Three quotes comparison sheet for equipment OZ-94072. Dated 29 April 2026. 1 page. Signed by the procurement officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 729}} {"id": "isc-te-00165-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Teskwater Limited", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "3 July 2026"}, "checklist": ["Gateway integration request form, signed", "Test environment transaction log, issued within the last 1 months", "If the gateway will handle recurring subscription payments, also: subscription billing mandate template, signed", "Go-live sign-off certificate, issued within the last 1 months, signed", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review", "Payment gateway technical specification", "Penetration test summary, issued within the last 6 months, signed"], "submission": {"case": {"name": "payment gateway EG-51001", "reference": "MP-69353", "details": ["The gateway will handle recurring subscription payments.", "The gateway will not store customers' card details."]}, "documents received": ["Test environment transaction log for payment gateway EG-51001, dated 30 June 2026. 4 pages, complete.", "Gateway integration request form for payment gateway EG-51001, dated 3 April 2026. 2 pages, complete. It is signed by the Head of Payments and IT Security.", "Go-live sign-off certificate for payment gateway EG-51001, dated 14 June 2026. 1 page. It is signed by the Payments Operations Director.", "Penetration test summary for payment gateway EG-51001, dated 2 March 2026. 3 pages, complete. It is signed by the Penetration Test Team Manager.", "Subscription billing mandate template for payment gateway EG-51001, dated 4 April 2026. 2 pages, complete. It is signed by the Treasury Manager.", "Payment gateway technical specification for payment gateway EG-51001, dated 5 May 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 823}} {"id": "isc-te-00037-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Stervdale BV", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "5 May 2026"}, "checklist": ["Fit-out cost estimate, issued within the last 6 months and signed", "Pilot operation audit report, issued within the last 6 months and signed", "If the franchisee intends to operate through a company rather than as an individual, also: shareholder agreement extract, signed", "Operator licence, valid (not expired) on the date of the review", "If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement, valid (not expired) on the date of the review and signed", "Franchise application form, signed"], "submission": {"case": {"name": "Yarvcourt LLP", "reference": "AE-94886", "details": ["The franchisee intends to operate through a company rather than as an individual.", "The franchise territory does not include premises in a shopping centre."]}, "documents received": ["Pilot operation audit report - Yarvcourt LLP.pdf. A pilot operation audit report for Yarvcourt LLP, dated 3 January 2026. 8 pages, complete. Signed by the pilot operation auditor.", "Shareholder agreement extract - Yarvcourt LLP.pdf. A shareholder agreement extract for Yarvcourt LLP, dated 29 January 2026. 4 pages, complete. Signed by a director of Yarvcourt LLP.", "Operator licence - Yarvcourt LLP.pdf. An operator licence for Yarvcourt LLP, with an expiry date of 10 December 2027. 2 pages, complete.", "Franchise application form - Yarvcourt LLP.pdf. A franchise application form for Yarvcourt LLP, dated 22 January 2026. 3 pages, complete. Signed by a partner of Yarvcourt LLP.", "Funding agreement - Yarvcourt LLP.pdf. A funding agreement from a lender for Yarvcourt LLP, dated 15 February 2026. 6 pages, complete. Signed by the lender's loans officer.", "Fit-out cost estimate - Yarvcourt LLP.pdf. A fit-out cost estimate for Yarvcourt LLP, dated 5 November 2024. 4 pages, complete. Signed by the franchisor's fit-out manager.", "Fit-out cost estimate - Yarvcourt LLP.pdf. A fit-out cost estimate for Yarvcourt LLP, dated 24 November 2025. 4 pages, complete. Signed by the franchisor's fit-out manager."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case, one by one. A required document counts only if: it is the kind of document listed (not a similar one); it is about the subject of the case; it has all its pages; it is signed where the checklist asks for a signature; it has not expired on the date of the review; and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-2", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 942}} {"id": "isc-te-00023-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Aldvik Limited", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "17 August 2026"}, "checklist": ["Engineer F-gas handling certificate, valid (not expired) on the date of the review.", "Engineer's service report, issued within the last 1 months, signed.", "Asset condition photograph sheet, issued within the last 1 months.", "Plant room access sign-in sheet.", "F-gas leak check record, issued within the last 12 months, signed.", "System pressure test results, issued within the last 1 months, signed."], "submission": {"case": {"name": "air conditioning system TH-31121", "reference": "TH-69673"}, "cover note": "Please find attached the air conditioning service pack, which is complete and includes everything needed. Let me know if you require anything further. Juliette Natock", "documents received": ["Asset condition photograph sheet for air conditioning system TH-31121, issued on 3 August 2026. 2 pages, complete.", "Engineer F-gas handling certificate for air conditioning system TH-31121, showing an expiry date of 13 March 2027. Single page.", "Plant room access sign-in sheet for air conditioning system TH-31121, issued on 31 July 2026. Single page.", "System pressure test results for air conditioning system TH-31121, issued on 1 August 2026. Pages 1-1 of 2 only are included. Signed by the test engineer.", "F-gas leak check record for air conditioning system TH-31121, issued on 10 November 2025. 2 pages, complete. Signed by the attending engineer.", "Engineer's service report for air conditioning system TH-31121, issued on 6 August 2026. 3 pages, complete. Signed by the service engineer."]}}, "question": {"type": "choice", "instructions": "Your task is to decide whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-40", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 833}} {"id": "isc-te-00058-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Orrfeld plc", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "14 August 2026"}, "checklist": ["Employment income summary, issued within the last 13 months", "Childcare payment receipt, issued within the last 13 months", "Bank interest statement, issued within the last 13 months", "Gift aid donation summary", "Tax return draft printout, signed"], "submission": {"case": {"name": "household tax affairs EZ-41809", "reference": "TK-75367"}, "documents received": ["tax_return_draft_printout.pdf. A tax return draft printout about household tax affairs EZ-41809, dated 20 May 2026. 6 pages, complete. It carries the signature of the household's tax filer.", "bank_interest_statement.pdf. A bank interest statement about household tax affairs EZ-41809, dated 11 July 2026. 3 pages, complete.", "gift_aid_donation_summary.pdf. A gift aid donation summary about household tax affairs EZ-41809, dated 4 May 2026. It is a single page.", "childcare_payment_receipt.pdf. A childcare payment receipt about household tax affairs EZ-41809, dated 13 October 2025. It is a single page.", "pension_contribution_certificate.pdf. A pension contribution certificate about household tax affairs EZ-41809, dated 21 June 2026. 2 pages, complete.", "employment_income_summary.pdf. An employment income summary about household tax affairs EZ-41809, dated 19 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack meets the checklist. Go line by line through the checklist, covering every line relevant to this case. To count, a required document must be of the kind listed on the checklist (not a similar one), be about the subject of the case, have all its pages present, be signed wherever the checklist calls for a signature, not be expired on the date of the review, and fall within the issue period the checklist allows. A conditional line applies only when its circumstance is true for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: one or more applicable lines are not satisfied. unclear: no applicable line is clearly unmet, yet at least one cannot be determined from what is shown, such as a needed date, signature or page count being not visible, a document's kind being impossible to tell, or the case details not stating whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels can mislead; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-37", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 790}} {"id": "isc-te-00238-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Austmouth Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "11 August 2026"}, "checklist": ["If the borrower is self-employed, also: two most recent tax year overviews (issued within the last 18 months, signed)", "passport (valid (not expired) on the date of the review)", "gifted deposit letter (issued within the last 3 months, signed)", "mortgage application form (issued within the last 3 months, signed)", "three most recent payslips (issued within the last 3 months)"], "submission": {"case": {"name": "Charlotte Lovez", "reference": "OA-94851", "details": ["The borrower is not self-employed."]}, "documents received": ["Three months of bank statements for Charlotte Lovez, dated 20 July 2026. 9 pages, complete.", "Passport for Charlotte Lovez, showing an expiry date of 15 December 2028. 2 pages, complete.", "Gifted deposit letter for Charlotte Lovez, dated 3 June 2026. Single page, signed by the donor of the gift.", "Mortgage application form for Charlotte Lovez, dated 4 July 2026. 10 pages, complete, signed by the borrower.", "Three most recent payslips for Charlotte Lovez, dated 7 August 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 697}} {"id": "isc-te-00462-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Xanholm LLP", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "17 August 2026"}, "checklist": ["Account statement showing recent activity, issued within the last 1 months", "Photo identification, valid (not expired) on the date of the review", "Fraud questionnaire, signed", "Card replacement request form, signed", "Confirmation of contact details, issued within the last 3 months", "Lost card declaration, signed"], "submission": {"case": {"name": "Rory Tibow", "reference": "DN-27132"}, "documents received": ["Lost card declaration.pdf. This lost card declaration for Rory Tibow is dated 26 June 2026. It is a single page. It is signed by the cardholder.", "Card replacement request form.pdf. This card replacement request form for Rory Tibow is dated 25 May 2026. 2 pages, complete. It is signed by the cardholder.", "Confirmation of contact details.pdf. This confirmation of contact details for Rory Tibow is dated 7 January 2026. It is a single page.", "Delivery address confirmation.pdf. This delivery address confirmation for Rory Tibow is dated 12 May 2026. It is a single page. It is signed by the cardholder.", "Fraud questionnaire.pdf. This fraud questionnaire for Rory Tibow is dated 8 July 2026. 2 pages, complete. It is signed by the cardholder.", "Account statement showing recent activity.pdf. This account statement showing recent activity for Rory Tibow is dated 7 August 2026. 3 pages, complete.", "Photo identification.pdf. This photo identification for Rory Tibow shows an expiry date of 16 October 2027. It is a single page."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case, one by one. A required document counts only if: it is the kind of document listed (not a similar one); it is about the subject of the case; it has all its pages; it is signed where the checklist asks for a signature; it has not expired on the date of the review; and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-2", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 785}} {"id": "isc-te-00461-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Kenvwell & Co", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "4 March 2026"}, "checklist": ["Property valuation report, issued within the last 6 months and signed.", "Employment certificate, issued within the last 1 months and signed.", "Photo identity document, valid (not expired) on the date of the review.", "Sale and purchase agreement, signed.", "If the property is a new build, also: new build warranty certificate.", "Proof of deposit, issued within the last 3 months."], "submission": {"case": {"name": "property BG-8952", "reference": "YY-95642", "details": ["The property is a new build."]}, "documents received": ["Photo identity document for property BG-8952, showing an expiry date of 15 October 2027. Single page.", "Property valuation report for property BG-8952, dated 8 November 2025. 10 pages, complete. The report is signed by the surveyor.", "Employment certificate for property BG-8952, dated 18 February 2026. Single page. The certificate is signed by the employer.", "New build warranty certificate for property BG-8952, dated 1 December 2025. 3 pages, complete.", "Sale and purchase agreement for property BG-8952, dated 22 December 2025. 9 pages, complete. The agreement is signed by the buyer and the seller.", "Neighbourhood guide with average house prices for property BG-8952, dated 8 November 2025. 10 pages, complete. The guide is signed by the compiler.", "Proof of deposit for property BG-8952, dated 1 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 793}} {"id": "isc-te-00263-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Gravton GmbH", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "20 March 2026"}, "checklist": ["Remediation items list, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Alerting rules review note, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months, signed.", "Customer impact statement, issued within the last 3 months."], "submission": {"case": {"name": "production incident UI-22644", "reference": "SZ-62023"}, "documents received": ["Customer impact statement for production incident UI-22644. Date of issue: 18 February 2026. 2 pages, complete.", "Incident timeline for production incident UI-22644. Date of issue: 1 March 2026. 3 pages, complete.", "Alerting rules review note for production incident UI-22644. Date of issue: 18 January 2026. 2 pages, complete.", "Follow-up owner assignment sheet for production incident UI-22644. Date of issue: 18 January 2026. Single page. Signed by the follow-up coordinator.", "Postmortem meeting minutes for production incident UI-22644. Date of issue: 7 January 2026. 3 pages, complete. Signed by the incident postmortem chair.", "Service level objective breach record for production incident UI-22644. Date of issue: 29 January 2026. Single page.", "Remediation items list for production incident UI-22644. Date of issue: 5 January 2026. 2 pages, complete. Signed by the reliability engineering lead.", "Root cause analysis report for production incident UI-22644. Date of issue: 13 January 2026. 5 pages, complete. Signed by the root cause analysis author."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 860}} {"id": "isc-te-00452-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Bravhaven Inc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "12 August 2026"}, "checklist": ["Leaver notification form, signed.", "Final payroll cut-off note, signed, issued within the last 1 months.", "Line manager confirmation, signed, issued within the last 1 months.", "Shared mailbox handover record, signed, issued within the last 1 months.", "Access rights inventory, issued within the last 1 months.", "Service desk ticket closure summary, issued within the last 1 months."], "submission": {"case": {"name": "Andrew Vellcombe", "reference": "CI-98740"}, "documents received": ["Line manager confirmation for Andrew Vellcombe, dated 26 July 2026. Single page. Signed by the line manager.", "Service desk ticket closure summary for Andrew Vellcombe, dated 8 November 2025. 3 pages, complete.", "Shared mailbox handover record for Andrew Vellcombe, dated 31 July 2026. 2 pages, complete. Signed by the shared mailbox administrator.", "Access rights inventory for Andrew Vellcombe, dated 24 July 2026. 4 pages, complete.", "Leaver notification form for Andrew Vellcombe, dated 3 May 2026. 2 pages, complete. Signed by the line manager.", "Equipment return receipt for Andrew Vellcombe, dated 1 August 2026. Single page. Signed by the IT asset coordinator.", "Non-disclosure reminder acknowledgement for Andrew Vellcombe, dated 8 June 2026. Single page. Signed by the departing employee.", "Final payroll cut-off note for Andrew Vellcombe, dated 22 July 2026. Single page. Signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide. Review each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Give complete if every applicable line is met (extra documents do not matter). Give incomplete if at least one applicable line is not met. Give unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-25", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00009-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ivrwater Group", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "31 August 2026"}, "checklist": ["Confirm the pack contains a depreciation schedule for the asset to date.", "Confirm the pack contains signed board or budget holder approval for the disposal.", "Confirm the pack contains a fixed asset register extract for the asset.", "Confirm the pack contains a sales invoice or receipt for the sale proceeds, issued within the last 3 months.", "If the asset is a company car being part-exchanged, also: confirm the pack contains a part-exchange valuation from the dealer, issued within the last 3 months."], "submission": {"case": {"name": "disposed asset VI-76793", "reference": "CJ-14842", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Board or budget holder approval for the disposal of disposed asset VI-76793, dated 29 June 2026. Single page, signed by the group finance director.", "Asset disposal request form for disposed asset VI-76793, dated 14 June 2026. 2 pages, complete, signed by the requesting department manager.", "Depreciation schedule for the asset to date for disposed asset VI-76793, dated 17 May 2026. 2 pages, complete.", "Fixed asset register extract for the asset for disposed asset VI-76793, dated 17 July 2026. Single page.", "Sales invoice or receipt for the sale proceeds for disposed asset VI-76793, dated 10 August 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00395-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Creskwater Ltd", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "16 September 2026"}, "checklist": ["Default notice previously served, issued within the last 6 months, signed.", "If the defaulting party is a public sector body, also: public sector termination approvals record, issued within the last 3 months, signed.", "Losses calculation statement, issued within the last 1 months, signed.", "Termination clause legal opinion, issued within the last 1 months, signed.", "Termination notice draft, signed.", "Original service agreement copy.", "Cure period expiry calculation, issued within the last 1 months, signed."], "submission": {"case": {"name": "Kaldbury GmbH", "reference": "XV-18490", "details": ["The defaulting party is a private company."]}, "documents received": ["Termination notice draft - Kaldbury GmbH.pdf. This is the termination notice draft about Kaldbury GmbH, dated 13 July 2026. It is 2 pages, complete, and signed by the head of legal.", "Cure period expiry calculation - Kaldbury GmbH.pdf. This is the cure period expiry calculation about Kaldbury GmbH, dated 14 September 2026. It is 2 pages, complete, and signed by the contract manager.", "Losses calculation statement - Kaldbury GmbH.pdf. This is the losses calculation statement about Kaldbury GmbH, dated 26 August 2026. It is 3 pages, complete, and signed by the finance director.", "Termination clause legal opinion - Kaldbury GmbH.pdf. This is the termination clause legal opinion about Kaldbury GmbH, dated 8 September 2026. It is 5 pages, complete, and signed by external counsel.", "Litigation hold notice - Kaldbury GmbH.pdf. This is the litigation hold notice about Kaldbury GmbH, dated 3 September 2026. It is 2 pages, complete, and signed by the head of legal.", "Original service agreement copy - Kaldbury GmbH.pdf. This is the original service agreement copy about Kaldbury GmbH, dated 9 June 2026. It is 10 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 871}} {"id": "isc-te-00400-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravby plc", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "12 March 2026"}, "checklist": ["Inbound unloading record, issued within the last 1 months and signed.", "Damaged goods exception sheet, issued within the last 1 months and signed.", "Load consolidation sheet, issued within the last 3 months and signed.", "Outbound loading record, issued within the last 1 months and signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet, issued within the last 1 months and signed.", "Transfer manifest, signed.", "Cross-dock slot booking sheet, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer CF-57678", "reference": "AQ-93363", "details": ["The transfer includes a temperature-controlled load."]}, "documents received": ["Outbound-loading-record-CF-57678.pdf. An outbound loading record for cross-dock transfer CF-57678, dated 4 March 2026. Single page, signed by the loading bay operator.", "Load-consolidation-sheet-CF-57678.pdf. A load consolidation sheet for cross-dock transfer CF-57678, dated 19 January 2026. 2 pages, complete, signed by the load planner.", "Transfer-manifest-CF-57678.pdf. A transfer manifest for cross-dock transfer CF-57678, dated 21 November 2025. 3 pages, complete, signed by the transport planner.", "Cross-dock-chiller-unit-check-sheet-CF-57678.pdf. A cross-dock chiller unit check sheet for cross-dock transfer CF-57678, dated 6 March 2026. Single page, signed by the refrigeration technician.", "Cross-dock-slot-booking-sheet-CF-57678.pdf. A cross-dock slot booking sheet for cross-dock transfer CF-57678, dated 7 March 2026. Single page, signed by the cross-dock coordinator.", "Damaged-goods-exception-sheet-CF-57678.pdf. A damaged goods exception sheet for cross-dock transfer CF-57678, dated 9 March 2026. Single page, signed by the shift supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 924}} {"id": "isc-te-00464-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Quelfell Ltd", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "15 April 2026"}, "checklist": ["If the property is being bought from a family member, also: independent purchase price assessment (issued within the last 3 months, signed)", "Mortgage application form (signed)", "Photo identity document (valid (not expired) on the date of the review)", "Property valuation report (issued within the last 6 months, signed)", "Employment certificate (issued within the last 1 months, signed)", "Sale and purchase agreement (signed)", "Proof of deposit (issued within the last 3 months)"], "submission": {"case": {"name": "property FN-50742", "reference": "TZ-90153", "details": ["The property is being bought from an unrelated seller."]}, "documents received": ["TZ-90153 Mortgage application form.pdf — Mortgage application form for property FN-50742. Date of issue: 25 January 2026. 6 pages, complete. Signed by the applicant.", "TZ-90153 Sale and purchase agreement.pdf — Sale and purchase agreement for property FN-50742. Date of issue: 26 December 2025. 9 pages, complete. Signed by the buyer and the seller.", "TZ-90153 Property valuation report.pdf — Property valuation report for property FN-50742. Date of issue: 24 March 2026. 10 pages, complete. Signed by the valuer.", "TZ-90153 Bank statement.pdf — Bank statement relating to property FN-50742. Date of issue: 2 March 2026. 3 pages, complete.", "TZ-90153 Proof of deposit.pdf — Proof of deposit relating to property FN-50742. Date of issue: 2 March 2026. Single page.", "TZ-90153 Photo identity document.pdf — Photo identity document relating to property FN-50742. Expiry date: 29 April 2028. Single page.", "TZ-90153 Employment certificate.pdf — Employment certificate relating to property FN-50742. Date of issue: 30 March 2026. Single page. Signed by the employer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 911}} {"id": "isc-te-00173-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Belmhall Ltd", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "20 August 2026"}, "checklist": ["Check that the pack contains an incident timeline issued no more than 3 months ago.", "Check that the pack contains postmortem meeting minutes issued no more than 3 months ago and signed.", "Check that the pack contains a root cause analysis report issued no more than 3 months ago and signed.", "Check that the pack contains an alerting rules review note issued no more than 3 months ago."], "submission": {"case": {"name": "production incident FN-18440", "reference": "PK-62381"}, "cover note": "Please could you have a look through this pack before we close the incident, as I am not sure everything needed is in there. Thank you.", "documents received": ["Alerting rules review note for production incident FN-18440, date of issue 14 July 2026. 2 pages, complete.", "Root cause analysis report for production incident FN-18440, date of issue 29 June 2026. 5 pages, complete. Signed by the lead reliability engineer.", "Incident timeline for production incident FN-18440, date of issue 13 August 2026. 3 pages, complete.", "Postmortem meeting minutes for production incident FN-18440, date of issue 10 August 2026. 3 pages, complete. Signed by the meeting chair.", "File Scan_20260819_047.pdf: the scan is blank and nothing on it can be made out.", "Follow-up owner assignment sheet for production incident FN-18440, date of issue 1 June 2026. Single page. Signed by the incident manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 795}} {"id": "isc-te-00259-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Bravwell SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 September 2026"}, "checklist": ["Check that the identity verification document is valid, that is not expired, on the date of the review.", "Check that the loyalty scheme enrolment form is signed.", "Check that the terms and conditions acceptance sheet is signed.", "Check that the points transfer request is signed.", "Check that the marketing consent form is signed.", "Check that the initial points balance statement was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also check that the points transfer evidence statement was issued within the last 3 months and is signed."], "submission": {"case": {"name": "Agnieszka Daskcombe", "reference": "WN-41554", "details": ["The customer is transferring points from a rival scheme."]}, "cover note": "Dear team, everything needed for this pack is attached and complete. Please proceed with the review. Kind regards, Burak Thornopoulos", "documents received": ["Terms and conditions acceptance sheet - Agnieszka Daskcombe.pdf. A single-page terms and conditions acceptance sheet for Agnieszka Daskcombe, dated 9 July 2026, signed by the customer.", "Marketing consent form - Agnieszka Daskcombe.pdf. A single-page marketing consent form for Agnieszka Daskcombe, dated 28 August 2026, signed by the customer.", "Loyalty scheme enrolment form - Agnieszka Daskcombe.pdf. A single-page loyalty scheme enrolment form for Agnieszka Daskcombe, dated 12 May 2026, signed by the customer.", "Identity verification document - Agnieszka Daskcombe.pdf. A single-page identity verification document for Agnieszka Daskcombe, showing an expiry date of 20 May 2028.", "Customer contact details sheet - Agnieszka Daskcombe.pdf. A single-page customer contact details sheet for Agnieszka Daskcombe, dated 16 June 2026, signed by the customer.", "Initial points balance statement - Agnieszka Daskcombe.pdf. A single-page initial points balance statement for Agnieszka Daskcombe, dated 27 July 2026.", "Points transfer request - Agnieszka Daskcombe.pdf. A single-page points transfer request for Agnieszka Daskcombe, dated 23 May 2026, signed by the customer."]}}, "question": {"type": "choice", "instructions": "Determine whether the pack is complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Mark the pack complete if every applicable line is met (extra documents do not matter). Mark the pack incomplete if at least one applicable line is not met. Mark the pack unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-28", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 954}} {"id": "isc-te-00087-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Lindcourt plc", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "3 April 2026"}, "checklist": ["Travel insurance quote issued within the last 1 months", "Special requests note, signed", "Passport details form, signed", "Booking request form, signed"], "submission": {"case": {"name": "holiday booking NN-90265", "reference": "KO-80548"}, "cover note": "Please accept my apologies for the pack being put together in a rush.", "documents received": ["File scan0008.pdf: the scan is too faint to read, so the contents cannot be seen.", "Special requests note for holiday booking NN-90265, dated 13 December 2025. Single page, signed by the customer.", "Passport details form for holiday booking NN-90265, dated 23 February 2026. Single page, signed by the customer.", "Booking request form for holiday booking NN-90265, dated 6 February 2026. 2 pages, complete. Signed by the reservations clerk.", "Travel insurance quote for holiday booking NN-90265, dated 21 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 669}} {"id": "isc-te-00143-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Sardbrook Limited", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "17 August 2026"}, "checklist": ["Confirm the pack contains an IT equipment loan form that has been signed.", "Confirm the pack contains a placement learning plan that has been signed.", "Confirm the pack contains a workplace induction checklist that has been issued within the last 1 months and that has been signed.", "Confirm the pack contains an emergency contact form.", "Confirm the pack contains a mentor assignment note that has been signed."], "submission": {"case": {"name": "Lukas Natby", "reference": "WQ-44926"}, "documents received": ["A workplace induction checklist for Lukas Natby, dated 1 August 2026; 2 pages, complete, signed by the induction coordinator.", "A one-page mentor assignment note for Lukas Natby, dated 10 June 2026, signed by the mentoring programme lead.", "An internship agreement for Lukas Natby, dated 1 June 2026; 4 pages, complete, signed by the internship coordinator.", "A placement learning plan for Lukas Natby, dated 8 July 2026; 2 pages, complete, signed by the placement supervisor.", "A one-page emergency contact form for Lukas Natby, dated 24 June 2026.", "A one-page IT equipment loan form for Lukas Natby, dated 6 May 2026, signed by the IT equipment loans officer.", "A file named scan_007.pdf; the scan is blank, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 730}} {"id": "isc-te-00048-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lombmore Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "7 September 2026"}, "checklist": ["Audit finding sheets (signed)", "Management review minutes (signed)", "If the audit found a major non-conformity, also: major non-conformity corrective action plan (signed)", "Audit attendance sheet (signed)", "Previous audit follow-up record (issued within the last 24 months, signed)"], "submission": {"case": {"name": "internal audit IG-1902", "reference": "OH-77753", "details": ["The audit found a major non-conformity."]}, "documents received": ["Audit attendance sheet for internal audit IG-1902, dated 21 June 2026. Single page. Signed by the lead auditor.", "Audit checklist for each area visited for internal audit IG-1902, dated 26 June 2026. 4 pages, complete. Signed by the lead auditor.", "Management review minutes for internal audit IG-1902, dated 25 May 2026. 4 pages, complete. Signed by the quality manager.", "Audit finding sheets for internal audit IG-1902, dated 17 June 2026. 2 pages, complete. The signature line is empty, so the document is not signed.", "Previous audit follow-up record for internal audit IG-1902, dated 25 January 2025. 2 pages, complete. Signed by the quality manager.", "Major non-conformity corrective action plan for internal audit IG-1902, dated 14 June 2026. 3 pages, complete. Signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 771}} {"id": "isc-te-00040-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Delvham BV", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "12 May 2026"}, "checklist": ["Seal number log, issued within the last 1 months and signed", "Load consolidation sheet, issued within the last 3 months and signed", "Cross-dock slot booking sheet, issued within the last 1 months and signed", "Outbound loading record, issued within the last 1 months and signed"], "submission": {"case": {"name": "cross-dock transfer QC-37927", "reference": "WU-40761"}, "cover note": "Apologies, this pack was put together in a rush. Please let me know if anything needs to be clarified.", "documents received": ["Cross-dock slot booking sheet for cross-dock transfer QC-37927, dated 26 April 2026. Single page, signed by the slot booking coordinator.", "Load consolidation sheet for cross-dock transfer QC-37927, dated 9 March 2026. 2 pages, complete, signed by the load planner.", "Seal number log for cross-dock transfer QC-37927, dated 2 May 2026. Single page, signed by the dispatch supervisor.", "Outbound loading record for cross-dock transfer QC-37927, dated 29 April 2026. Single page, signed by the outbound loading supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 704}} {"id": "isc-te-00251-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Halvness Ltd", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "2 July 2026"}, "checklist": ["If the equipment is above the major purchase threshold, also include: tender waiver justification (signed)", "equipment purchase request form (signed)", "cost-benefit justification", "maintenance plan", "training needs assessment (signed)", "installation requirements note"], "submission": {"case": {"name": "equipment JG-44908", "reference": "EJ-48033", "details": ["The equipment is below the major purchase threshold."]}, "cover note": "Please accept my apologies for this pack. It was put together in a rush.", "documents received": ["training needs assessment - JG-44908.pdf. This is the training needs assessment for equipment JG-44908, dated 8 May 2026. It is a single page and is signed by the training coordinator.", "cost-benefit justification - JG-44908.pdf. This is the cost-benefit justification for equipment JG-44908, dated 28 May 2026, 3 pages, complete.", "warranty leaflet - JG-44908.pdf. This is a warranty leaflet from a different product, dated 24 March 2026, 2 pages, complete. It refers to equipment JG-44908 only in the file name.", "equipment purchase request form - JG-44908.pdf. This is the equipment purchase request form for equipment JG-44908, dated 18 April 2026, 2 pages, complete. It is signed by the requesting department head.", "maintenance plan - JG-44908.pdf. This is the maintenance plan for equipment JG-44908, dated 24 March 2026, 2 pages, complete.", "installation requirements note - JG-44908.pdf. This is the installation requirements note for equipment JG-44908, dated 29 April 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 861}} {"id": "isc-te-00363-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Baxfeld & Co", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "7 May 2026"}, "checklist": ["Firewall change request form, signed.", "Peer review checklist, issued within the last 1 month, signed.", "Proposed rule change specification, signed.", "Rollback plan, signed.", "If the change is planned during the year-end close period, also: freeze period exception approval, signed.", "Business justification memo, issued within the last 3 months, signed."], "submission": {"case": {"name": "firewall change CX-23740", "reference": "UB-55755", "details": ["The change is planned during the year-end close period."]}, "documents received": ["File name: scan_0047.pdf. The file will not open, so its contents cannot be seen.", "Risk assessment for firewall change CX-23740. Date of issue: 15 April 2026. 2 pages, complete. Signed by the information security officer.", "Business justification memo for firewall change CX-23740. Date of issue: 17 March 2026. Single page. Signed by the requesting business manager.", "Proposed rule change specification for firewall change CX-23740. Date of issue: 7 February 2026. 2 pages, complete. Signed by the network engineer who prepared the specification.", "Freeze period exception approval for firewall change CX-23740. Date of issue: 18 March 2026. Single page. Signed by the head of the change advisory board.", "Firewall change request form for firewall change CX-23740. Date of issue: 16 April 2026. 3 pages, complete. Signed by the requesting change manager.", "Peer review checklist for firewall change CX-23740. Date of issue: 5 May 2026. Single page. Signed by the peer reviewer.", "Rollback plan for firewall change CX-23740. Date of issue: 28 March 2026. 2 pages, complete. Signed by the change manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 865}} {"id": "isc-te-00267-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Yselcombe LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "6 July 2026"}, "checklist": ["Insurance excess waiver certificate, valid (not expired) on the date of the review.", "Passport, valid (not expired) on the date of the review, and signed.", "Fuel policy sheet, signed.", "Additional driver authorisation form, signed.", "Vehicle condition report, signed.", "Booking voucher, issued within the last 6 months.", "If the booking includes crossing a land border, also: cross-border travel permission, signed."], "submission": {"case": {"name": "Thomas Yellworth", "reference": "KU-46488", "details": ["The booking stays within one country."]}, "documents received": ["Fuel policy sheet for Thomas Yellworth. It shows a date of issue of 24 May 2026 and is signed by the hirer, Thomas Yellworth. It is 1 page.", "Passport for Thomas Yellworth. It shows an expiry date of 22 July 2026 and is signed by the bearer, Thomas Yellworth. It is 1 page.", "Credit card in the driver's name, Thomas Yellworth. It shows an expiry date of 22 October 2027 and is signed on the reverse by the cardholder, Thomas Yellworth. It is 1 page.", "Insurance excess waiver certificate for Thomas Yellworth. It shows an expiry date of 4 May 2027. 2 pages, complete.", "Additional driver authorisation form for Thomas Yellworth. It shows a date of issue of 26 June 2026 and is signed by the hirer, Thomas Yellworth. It is 1 page.", "Booking voucher for Thomas Yellworth. It shows a date of issue of 7 June 2026. It is 1 page.", "Vehicle condition report for Thomas Yellworth. It shows a date of issue of 18 May 2026 and is signed by the counter agent. It is 2 pages, complete.", "Passport for Thomas Yellworth. It shows an expiry date of 25 November 2025 and is signed by the bearer, Thomas Yellworth. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 885}} {"id": "isc-te-00280-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Yarvham Limited", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "4 May 2026"}, "checklist": ["Board resolution to open the account, signed", "Company tax registration certificate", "Proof of registered office address, issued within the last 3 months", "If the company operates in a cash-intensive trade, also: cash handling policy, signed", "Authorised signer identity document, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Lombham Partners", "reference": "JE-39716", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["A scanned company tax registration certificate for Lombham Partners, issued on 6 January 2026. It is 1 page.", "A scanned proof of registered office address for Lombham Partners, issued on 15 April 2026. It is 1 page.", "A scanned authorised signer identity document for Lombham Partners, with an expiry date of 15 August 2028. It is 1 page.", "A scanned cash handling policy for Lombham Partners, dated 31 March 2026. It is 2 pages, complete, and signed by the managing director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 661}} {"id": "isc-te-00158-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Yarvgate & Co", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "28 May 2026"}, "checklist": ["Knowledge test pass certificate on file", "Driver declaration of convictions, signed, on file", "Photo driving licence on file, valid on the date of the review and not expired", "Medical examination certificate on file, issued within the last 6 months and signed", "Licence application form on file, signed", "Criminal record check on file, issued within the last 3 months"], "submission": {"case": {"name": "Anna Lundcombe", "reference": "EX-98046"}, "documents received": ["Criminal record check for Anna Lundcombe, dated 15 May 2026. 6 pages, complete.", "Licence application form for Anna Lundcombe, dated 20 April 2026. 6 pages, complete. Signed by the applicant, Anna Lundcombe.", "Photo driving licence for Anna Lundcombe, expiring 30 January 2027. Pages 1 to 1 included; the total number of pages is not shown anywhere.", "Medical examination certificate for Anna Lundcombe, dated 25 May 2026. 2 pages, complete. Signed by the examining doctor.", "Knowledge test pass certificate for Anna Lundcombe, dated 21 May 2026. Single page.", "Driver declaration of convictions for Anna Lundcombe, dated 8 March 2026. Signed by the driver, Anna Lundcombe. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 718}} {"id": "isc-te-00256-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Mersfell BV", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "29 May 2026"}, "checklist": ["Include the original complaint record, issued within the last 6 months.", "Include the goodwill gesture approval note, issued within the last 1 months and signed.", "Include the proposed resolution letter draft, signed.", "Include the customer contact log, issued within the last 3 months.", "Include the policy breach summary, issued within the last 3 months and signed.", "Include the complaint escalation form, issued within the last 1 months and signed."], "submission": {"case": {"name": "escalated complaint SD-98346", "reference": "GZ-99079"}, "documents received": ["SD-98346_proposed_resolution_letter_draft.pdf - Proposed resolution letter draft for escalated complaint SD-98346. Date of issue: 22 May 2026. 2 pages, complete, signed by the Customer Relations Manager.", "SD-98346_staff_shift_rota_service_desk.pdf - Staff shift rota for the service desk, linked to escalated complaint SD-98346. Date of issue: 11 May 2026. 3 pages, complete.", "SD-98346_policy_breach_summary.pdf - Policy breach summary for escalated complaint SD-98346. Date of issue: 1 May 2026. 2 pages, complete, signed by the Compliance Officer.", "SD-98346_goodwill_gesture_approval_note.pdf - Goodwill gesture approval note for escalated complaint SD-98346. Date of issue: 14 May 2026. Single page, signed by the Customer Relations Manager.", "SD-98346_original_complaint_record.pdf - Original complaint record for escalated complaint SD-98346. Date of issue: 24 April 2026. 2 pages, complete.", "SD-98346_complaint_escalation_form.pdf - Complaint escalation form for escalated complaint SD-98346. Date of issue: 26 May 2026. 2 pages, complete, signed by the Customer Relations Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 880}} {"id": "isc-te-00223-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Jundbury Limited", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "14 August 2026"}, "checklist": ["Confirm that the pack contains a transfer completion confirmation issued within the last 1 months, signed.", "Confirm that the pack contains an outbound loading record issued within the last 1 months, signed.", "Confirm that the pack contains an inbound unloading record issued within the last 1 months, signed.", "Confirm that the pack contains a damaged goods exception sheet issued within the last 1 months, signed.", "Confirm that the pack contains a seal number log issued within the last 1 months, signed."], "submission": {"case": {"name": "cross-dock transfer HU-37848", "reference": "TS-97557"}, "documents received": ["transfer_completion_confirmation_HU-37848_6Aug2026_v2.pdf. Transfer completion confirmation for cross-dock transfer HU-37848, dated 6 August 2026. Single page; the signature line is empty, so the document is not signed.", "load_consolidation_sheet_HU-37848_27Jun2026.pdf. Load consolidation sheet for cross-dock transfer HU-37848, dated 27 June 2026. 2 pages, complete; signed by the load consolidation planner.", "transfer_manifest_HU-37848_9Jul2026.pdf. Transfer manifest for cross-dock transfer HU-37848, dated 9 July 2026. 3 pages, complete; signed by the transport planner.", "damaged_goods_exception_sheet_HU-37848_25Jul2026.pdf. Damaged goods exception sheet for cross-dock transfer HU-37848, dated 25 July 2026. Single page, signed by the warehouse shift supervisor.", "outbound_loading_record_HU-37848_10Aug2026.pdf. Outbound loading record for cross-dock transfer HU-37848, dated 10 August 2026. Single page, signed by the outbound loading supervisor.", "inbound_unloading_record_HU-37848_5Aug2026.pdf. Inbound unloading record for cross-dock transfer HU-37848, dated 5 August 2026. Single page, signed by the inbound unloading supervisor.", "seal_number_log_HU-37848_12Aug2026.pdf. Seal number log for cross-dock transfer HU-37848, dated 12 August 2026. Single page, signed by the outbound driver."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 990}} {"id": "isc-te-00171-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Fennthorpe plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "3 September 2026"}, "checklist": ["Root cause analysis report, issued within the last 3 months and signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months and signed.", "Follow-up owner assignment sheet, issued within the last 3 months and signed.", "If the incident involved a data leak to an outside party, also: data breach notification record, issued within the last 3 months and signed.", "Customer impact statement, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Remediation items list, issued within the last 3 months and signed."], "submission": {"case": {"name": "production incident NA-65901", "reference": "RU-67954", "details": ["The incident was caused entirely by internal systems.", "The incident involved a data leak to an outside party."]}, "documents received": ["NA-65901_remediation_items_list.pdf - Remediation items list for production incident NA-65901, dated 6 July 2026. 2 pages, complete. Signed by the engineering manager.", "NA-65901_postmortem_meeting_minutes.pdf - Postmortem meeting minutes for production incident NA-65901, dated 7 August 2026. 3 pages, complete. Signed by the chair of the postmortem meeting.", "NA-65901_follow_up_owner_assignment_sheet.pdf - Follow-up owner assignment sheet for production incident NA-65901, dated 31 August 2026. Single page. Signed by the incident manager.", "NA-65901_data_breach_notification_record.pdf - Data breach notification record for production incident NA-65901, dated 6 August 2026. 2 pages, complete. Signed by the data protection officer.", "NA-65901_incident_timeline.pdf - Incident timeline for production incident NA-65901, dated 25 July 2026. 3 pages, complete.", "NA-65901_root_cause_analysis_report.pdf - Root cause analysis report for production incident NA-65901, dated 4 August 2026. 5 pages, complete. Signed by the lead reliability engineer.", "NA-65901_press_release.pdf - Press release about a new product launch, dated 8 August 2026, connected to production incident NA-65901. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 981}} {"id": "isc-te-00229-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Boltmont Ltd", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "15 May 2026"}, "checklist": ["Audit agenda (signed)", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary (issued within the last 3 months, signed)", "Layout tour plan (signed)", "Document control list (issued within the last 3 months, signed)", "Training matrix extract (issued within the last 3 months, signed)", "Audit scope statement (signed)"], "submission": {"case": {"name": "customer audit visit RD-78940", "reference": "ER-54632", "details": ["The customer auditor requests access to sub-tier supplier records."]}, "documents received": ["RD-78940_document_control_list.pdf — Document control list for customer audit visit RD-78940. Date of issue: 14 March 2026. 4 pages, complete. Signed by the Document Control Coordinator.", "RD-78940_layout_tour_plan.pdf — Layout tour plan for customer audit visit RD-78940. Date of issue: 22 March 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_training_matrix_extract.pdf — Training matrix extract for customer audit visit RD-78940. Date of issue: 9 March 2026. 3 pages, complete. Signed by the Human Resources Coordinator.", "RD-78940_open_corrective_action_list.pdf — Open corrective action list for customer audit visit RD-78940. Date of issue: 29 April 2026. 2 pages, complete. Signed by the Quality Management Office Manager.", "RD-78940_audit_scope_statement.pdf — Audit scope statement for customer audit visit RD-78940. Date of issue: 5 March 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_audit_agenda.pdf — Audit agenda for customer audit visit RD-78940. Date of issue: 28 February 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_calibration_status_summary.pdf — Calibration status summary for customer audit visit RD-78940. Date of issue: 13 May 2026. 2 pages, complete. Signed by the Calibration Technician."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 939}} {"id": "isc-te-00387-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Oxlfell Group", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "22 July 2026"}, "checklist": ["Confirm the pack contains a contact plan for time away.", "Confirm the pack contains a handover note, signed.", "If the employee is requesting leave during a known busy period, also: confirm the pack contains a business case for peak-period leave, signed.", "Confirm the pack contains a team holiday planner extract.", "Confirm the pack contains a manager approval email issued within the last 2 months."], "submission": {"case": {"name": "Gustavo Rookton", "reference": "VB-36010", "details": ["The employee is not requesting leave during a known busy period."]}, "documents received": ["Handover note. The note concerns Gustavo Rookton and shows its date of issue as 29 May 2026. It runs to 2 pages, complete, and is signed by the employee.", "Contact plan for time away. The plan covers Gustavo Rookton and shows its date of issue as 11 July 2026. It is a single page.", "Manager approval email. The email concerns Gustavo Rookton and shows its date of issue as 30 September 2025. It is a single page.", "Team holiday planner extract. The extract concerns Gustavo Rookton and shows its date of issue as 11 May 2026. It runs to 2 pages, complete.", "Statutory holiday entitlement confirmation. The confirmation concerns Gustavo Rookton and shows its date of issue as 7 May 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 742}} {"id": "isc-te-00417-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Vaskhall Group", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "10 September 2026"}, "checklist": ["Confirm the pack contains proof of deposit savings issued within the last 3 months.", "Confirm the pack contains a property valuation report issued within the last 3 months and signed.", "Confirm the pack contains the three most recent payslips issued within the last 3 months.", "Confirm the pack contains three months of bank statements issued within the last 3 months."], "submission": {"case": {"name": "Simon Foskani", "reference": "JA-60691"}, "cover note": "My apologies that this pack was assembled in a rush.", "documents received": ["JA-60691_proof-of-deposit-savings_Foskani.pdf - Proof of deposit savings for Simon Foskani, dated 7 September 2026. 2 pages, complete.", "JA-60691_bank-statements_Foskani.pdf - Three months of bank statements for Simon Foskani, dated 25 July 2026. 9 pages, complete.", "JA-60691_property-valuation-report-7_Foskani.pdf - Property valuation report for Simon Foskani, dated 21 June 2026, signed by the valuer. 8 pages, complete.", "JA-60691_property-valuation-report-8_Foskani.pdf - Property valuation report for Simon Foskani, dated 23 July 2025, signed by the valuer. 8 pages, complete.", "JA-60691_payslips_Foskani.pdf - Three most recent payslips for Simon Foskani, dated 31 July 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete when every applicable line is met (extra documents do not matter). Return incomplete when at least one applicable line is not met. Return unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "variant-29", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 781}} {"id": "isc-te-00155-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Elvham Group", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "6 May 2026"}, "checklist": ["If the applicant has lived at an address outside the country in the last five years, also: criminal record certificate from overseas (issued within the last 3 months)", "If the applicant is applying for a hackney carriage licence rather than private hire, also: vehicle specification sheet for the hackney carriage", "Criminal record check (issued within the last 3 months)", "Right to work share code printout (issued within the last 3 months)", "Licence application form (signed)", "Driver declaration of convictions (signed)"], "submission": {"case": {"name": "Orla Bramwick", "reference": "PX-75567", "details": ["The applicant has lived at the same address in the country for the last five years.", "The applicant is applying for a hackney carriage licence rather than private hire."]}, "documents received": ["Licence application form - Orla Bramwick. Date of issue: 24 February 2026. 6 pages, complete. Signed by the applicant.", "Vehicle specification sheet for the hackney carriage - Orla Bramwick. Date of issue: 17 March 2026. 2 pages, complete.", "Right to work share code printout - Orla Bramwick. Date of issue: 5 March 2026. Single page.", "Criminal record check - Orla Bramwick. Date of issue: 2 May 2026. 6 pages, complete.", "Driver declaration of convictions - Orla Bramwick. Date of issue: 27 February 2026. Single page. Signed by the driver."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 763}} {"id": "isc-te-00310-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Pellcombe GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "28 August 2026"}, "checklist": ["Asbestos survey", "If the warehouse stores food products, also: food storage approval certificate, valid (not expired) on the date of the review", "Planning permission", "Racking inspection report, issued within the last 12 months, signed", "Fire safety certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "warehouse TI-60354", "reference": "YI-31010", "details": ["The warehouse stores food products."]}, "cover note": "Please accept my apologies that this pack was put together in a rush.", "documents received": ["Food storage approval certificate for warehouse TI-60354, showing an expiry date of 7 February 2029. Single page.", "Racking inspection report for warehouse TI-60354, dated 29 November 2025. 2 pages, complete. Signed by the inspecting engineer.", "Asbestos survey for warehouse TI-60354, dated 15 July 2026. 5 pages, complete.", "Fire safety certificate for warehouse TI-60354, showing an expiry date of 25 June 2028. 2 pages, complete.", "Warehouse insurance policy for warehouse TI-60354, showing an expiry date of 7 December 2026. 6 pages, complete.", "Planning permission for warehouse TI-60354, dated 30 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 754}} {"id": "isc-te-00008-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Glenstead Ltd", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "3 August 2026"}, "checklist": ["Signed bank charges and interest explanation sheet.", "If the account is a foreign currency account, also: signed exchange rate conversion schedule.", "Outstanding receipts list.", "Signed reviewer sign-off sheet for the reconciliation.", "Signed bank reconciliation statement.", "If the reconciliation shows an unexplained difference that is not an outstanding item, also: signed unexplained difference investigation note.", "Direct debit mandate report from the bank, issued within the last 3 months."], "submission": {"case": {"name": "company bank account ZZ-59368", "reference": "LP-94539", "details": ["The account is a foreign currency account.", "The reconciliation shows an unexplained difference that is not an outstanding item."]}, "documents received": ["direct_debit_mandate_report_ZZ-59368.pdf - Direct debit mandate report from the bank for company bank account ZZ-59368, dated 1 July 2026. It is 2 pages, complete.", "outstanding_receipts_list_ZZ-59368.pdf - Outstanding receipts list for company bank account ZZ-59368, dated 6 July 2026. It is a single page.", "reviewer_sign-off_sheet_ZZ-59368.pdf - Reviewer sign-off sheet for the reconciliation for company bank account ZZ-59368, dated 9 June 2026. It is a single page, signed by the financial controller.", "bank_reconciliation_statement_ZZ-59368.pdf - Bank reconciliation statement for company bank account ZZ-59368, dated 17 April 2026. It shows pages 1-1 of 2, and it is signed by the financial controller.", "unexplained_difference_investigation_note_ZZ-59368.pdf - Unexplained difference investigation note for company bank account ZZ-59368, dated 30 April 2026. It is 2 pages, complete, and signed by the financial controller.", "bank_charges_and_interest_explanation_sheet_ZZ-59368.pdf - Bank charges and interest explanation sheet for company bank account ZZ-59368, dated 13 June 2026. It is a single page, signed by the financial controller.", "exchange_rate_conversion_schedule_ZZ-59368.pdf - Exchange rate conversion schedule for company bank account ZZ-59368, dated 17 April 2026. It is a single page, signed by the financial controller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 968}} {"id": "isc-te-00107-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Maldmont plc", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "19 August 2026"}, "checklist": ["Product catalogue declaration, signed", "Returns policy statement, signed", "Anti-money laundering questionnaire, signed", "Authorised representative ID copy, valid (not expired) on the date of the review", "Bank account verification letter, issued within the last 3 months, signed", "Proof of trading address, issued within the last 3 months", "If the seller is a sole trader rather than a company, also: sole trader statutory declaration, signed"], "submission": {"case": {"name": "Silmont Ltd", "reference": "KC-98959", "details": ["The seller is a registered company."]}, "documents received": ["Silmont Ltd - bank account verification letter.pdf. A bank account verification letter for Silmont Ltd, dated 13 June 2026. It is a single page and is signed by a bank officer.", "Silmont Ltd - returns policy statement.pdf. A returns policy statement for Silmont Ltd, dated 11 August 2026. It runs to 2 pages, complete, and is signed by a director of Silmont Ltd.", "Silmont Ltd - authorised representative ID copy.pdf. A copy of the authorised representative's ID for Silmont Ltd, showing an expiry date of 7 October 2026. It is a single page.", "Silmont Ltd - proof of trading address 1.pdf. A proof of trading address for Silmont Ltd, dated 5 June 2026. It is a single page.", "Silmont Ltd - anti-money laundering questionnaire.pdf. An anti-money laundering questionnaire for Silmont Ltd, dated 22 July 2026. It runs to 3 pages, complete, and is signed by a director of Silmont Ltd.", "Silmont Ltd - product catalogue declaration.pdf. A product catalogue declaration for Silmont Ltd, dated 28 May 2026. It runs to 4 pages, complete, and is signed by a director of Silmont Ltd."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every line of the checklist that applies here. A required document only counts if it is the type of document listed (not a similar type), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it had not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-1", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00363-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Baxfeld & Co", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "7 May 2026"}, "checklist": ["Firewall change request form, signed.", "Peer review checklist, issued within the last 1 month, signed.", "Proposed rule change specification, signed.", "Rollback plan, signed.", "If the change is planned during the year-end close period, also: freeze period exception approval, signed.", "Business justification memo, issued within the last 3 months, signed."], "submission": {"case": {"name": "firewall change CX-23740", "reference": "UB-55755", "details": ["The change is planned during the year-end close period."]}, "documents received": ["Firewall change request form for firewall change CX-23740. Date of issue: 16 April 2026. 3 pages, complete. Signed by the requesting change manager.", "Rollback plan for firewall change CX-23740. Date of issue: 28 March 2026. 2 pages, complete. Signed by the change manager.", "Business justification memo for firewall change CX-23740. Date of issue: 17 March 2026. Single page. The signature line is empty: the memo is not signed.", "Proposed rule change specification for firewall change CX-23740. Date of issue: 7 February 2026. 2 pages, complete. Signed by the network engineer who prepared the specification.", "Peer review checklist for firewall change CX-23740. Date of issue: 5 May 2026. Single page. Signed by the peer reviewer.", "Freeze period exception approval for firewall change CX-23740. Date of issue: 18 March 2026. Single page. Signed by the head of the change advisory board."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00156-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Baxridge Group", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "15 June 2026"}, "checklist": ["Right to work share code printout, issued within the last 3 months", "Medical examination certificate, issued within the last 6 months and signed", "Criminal record check, issued within the last 3 months", "Signed licence application form", "If the applicant is applying for a hackney carriage licence rather than private hire, also: vehicle specification sheet for the hackney carriage"], "submission": {"case": {"name": "Seren Bixingham", "reference": "GY-35046", "details": ["The applicant is applying for a private hire licence rather than hackney carriage."]}, "documents received": ["GY-35046 Bixingham criminal record check. A criminal record check about Seren Bixingham, showing its date of issue as 10 June 2026, 6 pages, complete.", "GY-35046 Bixingham right to work share code printout. A single-page right to work share code printout about Seren Bixingham, showing its date of issue as 29 March 2026.", "GY-35046 Bixingham work permit letter. A single-page work permit letter from an employer's HR department about Seren Bixingham, showing its date of issue as 29 March 2026.", "GY-35046 Bixingham medical examination certificate. A medical examination certificate about Seren Bixingham, showing its date of issue as 24 March 2026, 2 pages, complete. It is signed by the examining doctor.", "GY-35046 Bixingham licence application form. A licence application form about Seren Bixingham, showing its date of issue as 24 May 2026, 6 pages, complete. It is signed by the applicant, Seren Bixingham."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 815}} {"id": "isc-te-00279-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Yondbury LLP", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "9 March 2026"}, "checklist": ["Outstanding receipts list", "Bank reconciliation statement, signed", "Bank statement for the period, issued within the last 2 months", "If the reconciliation shows an unexplained difference that is not an outstanding item, also: unexplained difference investigation note, signed", "General ledger cash account listing", "Outstanding payments list"], "submission": {"case": {"name": "company bank account HK-23180", "reference": "KP-23420"}, "documents received": ["General ledger cash account listing for company bank account HK-23180, dated 28 February 2026. 3 pages, complete.", "Unexplained difference investigation note for company bank account HK-23180, dated 2 January 2026. 2 pages, complete. Signed by the preparer.", "Bank statement for the period for company bank account HK-23180, dated 15 February 2026. 4 pages, complete.", "Bank reconciliation statement for company bank account HK-23180, dated 22 January 2026. 2 pages, complete. Signed by the financial controller.", "Outstanding payments list for company bank account HK-23180, dated 4 March 2026. 1 page.", "Outstanding receipts list for company bank account HK-23180, dated 12 November 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 732}} {"id": "isc-te-00232-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Gormshaw GmbH", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "11 March 2026"}, "checklist": ["If the kit contains food samples, also: food handling hygiene certificate (must be valid, that is not expired, on the date of the review)", "Kit cost breakdown (issued within the last 3 months and signed)", "Flammability test certificate (issued within the last 12 months)", "Point of sale design proof (signed)", "Brand colour specification"], "submission": {"case": {"name": "merchandising kit LC-39176", "reference": "WQ-22781", "details": ["The kit contains no food samples."]}, "documents received": ["Kit cost breakdown, merchandising kit LC-39176. The date of issue cannot be read because it is covered by a stamp, and it is signed by the retail marketing manager. 2 pages, complete.", "Waste disposal plan, merchandising kit LC-39176. The date of issue is 31 December 2025. Single page.", "Point of sale design proof, merchandising kit LC-39176. The date of issue is 18 January 2026, and it is signed by the design studio lead. 4 pages, complete.", "Flammability test certificate, merchandising kit LC-39176. The date of issue is 23 October 2025. Single page.", "Brand colour specification, merchandising kit LC-39176. The date of issue is 3 February 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 753}} {"id": "isc-te-00246-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Glenmark Inc", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "13 July 2026"}, "checklist": ["Obtain proof of savings, issued within the last 2 months.", "Obtain recent bank statements, issued within the last 2 months.", "Obtain a benefit claim form that is valid (not expired) on the date of the review and signed.", "If the claimant has a non-dependant adult living in the household, also obtain a non-dependant income details form, signed.", "Obtain proof of national insurance number.", "Obtain proof of identity that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "Arjun Ingford", "reference": "TO-48296", "details": ["The claimant has a non-dependant adult living in the household."]}, "cover note": "Please note this pack was already checked by a colleague before it reached you. Please review it as usual.", "documents received": ["Recent bank statements for Arjun Ingford. Date of issue: 20 June 2026. 12 pages, complete.", "Proof of identity for Arjun Ingford. Expiry date: 24 July 2028. Single page.", "Current tenancy agreement for Arjun Ingford. Date of issue: 7 May 2026. 12 pages, complete. Signed by the landlord and the tenant.", "Proof of national insurance number for Arjun Ingford. Date of issue: 30 April 2026. Single page.", "Non-dependant income details form for Arjun Ingford. Date of issue: 29 June 2026. 2 pages, complete. Signed by the non-dependant.", "Benefit claim form for Arjun Ingford. Expiry date: 22 September 2027. 12 pages, complete. Signed by the claimant.", "File: document_001.pdf. The file will not open, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00286-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Zaldwyn LLP", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "18 May 2026"}, "checklist": ["Terms of sale acceptance log, issued within the last 12 months", "Chargeback response form, signed", "Signature proof of delivery, issued within the last 6 months and signed", "If the goods were delivered to an address different from the billing address, also: address verification check report, issued within the last 3 months", "Transaction record printout, issued within the last 3 months", "Delivery confirmation, issued within the last 6 months", "Fraud screening result sheet, issued within the last 3 months"], "submission": {"case": {"name": "disputed transaction MN-64545", "reference": "FE-41761", "details": ["The goods were delivered to an address different from the billing address."]}, "documents received": ["Chargeback response form relating to disputed transaction MN-64545, dated 18 April 2026. 2 pages, complete. Signed by the disputes team lead.", "Transaction record printout relating to disputed transaction MN-64545, dated 2 March 2026. 1 page.", "Terms of sale acceptance log relating to disputed transaction MN-64545, dated 26 December 2025. 1 page.", "Customer account details page relating to disputed transaction MN-64545, dated 3 March 2026. 1 page.", "Address verification check report relating to disputed transaction MN-64545, dated 10 May 2026. 1 page.", "Delivery confirmation relating to disputed transaction MN-64545, dated 24 February 2026. 1 page.", "Signature proof of delivery relating to disputed transaction SP-76665, dated 24 December 2025. 1 page. Signed by the delivery driver.", "Customer order history extract relating to disputed transaction MN-64545, dated 30 January 2026. 2 pages, complete.", "Fraud screening result sheet relating to disputed transaction MN-64545, dated 8 April 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 883}} {"id": "isc-te-00438-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Halvmont GmbH", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "15 April 2026"}, "checklist": ["If the gateway will handle recurring subscription payments, also: subscription billing mandate template (signed)", "go-live sign-off certificate (issued within the last 1 months, signed)", "If the gateway will store customers' card details, also: card storage compliance certificate (valid (not expired) on the date of the review)", "merchant account agreement (signed)", "data protection impact assessment (issued within the last 12 months, signed)", "fraud screening configuration sheet (signed)"], "submission": {"case": {"name": "payment gateway QZ-24811", "reference": "HL-76895", "details": ["The gateway will not handle recurring subscription payments.", "The gateway will not store customers' card details."]}, "documents received": ["Data protection impact assessment for payment gateway QZ-24811, dated 8 September 2025. 5 pages, complete, signed by the data protection officer.", "Test environment transaction log for payment gateway QZ-24811, dated 29 March 2026. 4 pages, complete.", "Merchant account agreement for payment gateway QZ-24811, dated 31 December 2025. 6 pages, complete, signed by the merchant account manager.", "Payment gateway technical specification for payment gateway QZ-24811, dated 22 February 2026. 8 pages, complete.", "Go-live sign-off certificate for payment gateway QZ-24811, dated 28 March 2026. Single page, signed by the IT security lead.", "Fraud screening configuration sheet for payment gateway QZ-24811, dated 20 February 2026. Single page, signed by the fraud screening analyst."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00081-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Varnheim LLP", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "12 March 2026"}, "checklist": ["Incident timeline, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Service level objective breach record, issued within the last 3 months.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months and signed.", "Follow-up owner assignment sheet, issued within the last 3 months and signed."], "submission": {"case": {"name": "production incident QS-14969", "reference": "CV-96947", "details": ["The incident was caused by a third-party service outage."]}, "cover note": "I am sending on the pack for this review. It has already been checked by a colleague before it came to me.", "documents received": ["Follow-up owner assignment sheet concerning production incident QS-14969. It shows its date of issue as 24 December 2025. Signed by the reliability engineering team lead. 1 page.", "Customer impact statement concerning production incident QS-14969. It shows its date of issue as 12 January 2026. 2 pages, complete.", "Service level objective breach record concerning production incident QS-14969. It shows its date of issue as 8 January 2026. 1 page.", "Postmortem meeting minutes concerning production incident QS-14969. They show their date of issue as 11 February 2026. Signed by the meeting chair. 3 pages, complete.", "The on-call duty roster for the month of the incident concerning production incident QS-14969. It shows its date of issue as 8 February 2026. 3 pages, complete.", "Vendor outage acknowledgement letter concerning production incident QS-14969. It shows its date of issue as 6 March 2026. Signed by the vendor's service manager. 1 page.", "Root cause analysis report concerning production incident QS-14969. It shows its date of issue as 16 February 2026. Signed by the incident lead. 5 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine whether the checklist is fully satisfied by the pack. Go over every checklist line that applies to this case. A required document counts only when it is the kind of document the checklist lists (not merely a similar one), when it is about the case's subject, when it has all its pages, when it is signed wherever the checklist asks for a signature, when it has not expired as of the review date, and when it was issued within the period the checklist allows. Only if its circumstance holds for the case does a conditional line apply. complete: each applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example because a needed date, signature or page count is not visible, because a document's kind cannot be told, or because the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves are what you must judge.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-53", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 921}} {"id": "isc-te-00456-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Stromstow Partners", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "2 April 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed", "Employee bank detail confirmation, issued within the last 6 months and signed", "Travel advance request form, signed", "Travel policy extract showing advance eligibility", "If the trip involves travel to another country, also: foreign travel authorisation from a director, signed", "Outstanding advance clearance check, signed", "Line manager approval for the advance, signed"], "submission": {"case": {"name": "Sophie Moskini", "reference": "RK-62728", "details": ["The trip is wholly within the home country."]}, "documents received": ["Payroll_Deduction_Agreement_Advance_SM_15022026.pdf — Payroll deduction agreement for recovery of the advance for Sophie Moskini, dated 15 February 2026. Single page. Signed by Sophie Moskini and the payroll officer.", "Trip_Itinerary_and_Approval_SM_30032026.pdf — Trip itinerary and approval for Sophie Moskini, dated 30 March 2026. 2 pages, complete. Signed by the line manager.", "Travel_Policy_Extract_Advance_Eligibility_SM_27012026.pdf — Travel policy extract showing advance eligibility for Sophie Moskini, dated 27 January 2026. Single page.", "Outstanding_Advance_Clearance_Check_SM_26122025.pdf — Outstanding advance clearance check for Sophie Moskini, dated 26 December 2025. Single page. Signed by an accounts payable reviewer.", "Costed_Trip_Estimate_Sheet_SM_14032026.pdf — Costed trip estimate sheet for Sophie Moskini, dated 14 March 2026. Single page. Signed by Sophie Moskini.", "Travel_Advance_Request_Form_AP_20032026.pdf — Travel advance request form for Ananya Pimopoulos, dated 20 March 2026. Single page. Signed by Ananya Pimopoulos.", "Line_Manager_Approval_Advance_SM_03032026.pdf — Line manager approval for the advance for Sophie Moskini, dated 3 March 2026. Single page. Signed by the line manager.", "Employee_Bank_Detail_Confirmation_SM_01112025.pdf — Employee bank detail confirmation for Sophie Moskini, dated 1 November 2025. Single page. Signed by Sophie Moskini."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 969}} {"id": "isc-te-00155-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Elvham Group", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "6 May 2026"}, "checklist": ["If the applicant has lived at an address outside the country in the last five years, also: criminal record certificate from overseas (issued within the last 3 months)", "If the applicant is applying for a hackney carriage licence rather than private hire, also: vehicle specification sheet for the hackney carriage", "Criminal record check (issued within the last 3 months)", "Right to work share code printout (issued within the last 3 months)", "Licence application form (signed)", "Driver declaration of convictions (signed)"], "submission": {"case": {"name": "Orla Bramwick", "reference": "PX-75567", "details": ["The applicant has lived at the same address in the country for the last five years.", "The applicant is applying for a hackney carriage licence rather than private hire."]}, "documents received": ["Knowledge test pass certificate - Orla Bramwick. Date of issue: 13 March 2026. Single page.", "Criminal record check - Orla Bramwick. Date of issue: 2 May 2026. 6 pages, complete.", "Photo driving licence - Orla Bramwick. Expiry date: 5 May 2027. 2 pages, complete.", "Right to work share code printout - Orla Bramwick. Date of issue: 5 March 2026. Single page.", "Vehicle specification sheet for the hackney carriage - Orla Bramwick. Date of issue: 17 March 2026. 2 pages, complete.", "Driver declaration of convictions - Orla Bramwick. Date of issue: 27 February 2026. Single page. Signed by the driver."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 785}} {"id": "isc-te-00322-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Larvmoor Inc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "2 April 2026"}, "checklist": ["Confirm the pack includes the account closure procedure.", "Confirm the pack includes a two-factor authentication confirmation issued within the last 3 months.", "Confirm the pack includes a signed platform terms acceptance record.", "Confirm the pack includes a signed account request form.", "Confirm the pack includes a signed naming convention approval."], "submission": {"case": {"name": "new social media account FX-38776", "reference": "AG-45011"}, "documents received": ["account_closure_procedure_FX-38776.pdf. Account closure procedure for new social media account FX-38776. It is dated 21 December 2025 and is a single page.", "two_factor_authentication_confirmation_FX-38776.pdf. Two-factor authentication confirmation for new social media account FX-38776. It is dated 19 January 2026 and is a single page.", "platform_terms_acceptance_record_FX-38776.pdf. Platform terms acceptance record for new social media account FX-38776. It is dated 17 January 2026, is a single page and is signed by the social media manager.", "naming_convention_approval_FX-38776.pdf. Naming convention approval for new social media account FX-38776. It is dated 1 January 2026, is a single page and is signed by the social media governance lead.", "two_factor_authentication_confirmation_FX-38776_v2.pdf. Two-factor authentication confirmation for new social media account FX-38776. It is dated 15 April 2024 and is a single page.", "account_request_form_FX-38776.pdf. Account request form for new social media account FX-38776. It is dated 21 March 2026, is a single page and is signed by the requesting marketing manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00259-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Bravwell SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 September 2026"}, "checklist": ["Check that the identity verification document is valid, that is not expired, on the date of the review.", "Check that the loyalty scheme enrolment form is signed.", "Check that the terms and conditions acceptance sheet is signed.", "Check that the points transfer request is signed.", "Check that the marketing consent form is signed.", "Check that the initial points balance statement was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also check that the points transfer evidence statement was issued within the last 3 months and is signed."], "submission": {"case": {"name": "Agnieszka Daskcombe", "reference": "WN-41554", "details": ["The customer is transferring points from a rival scheme."]}, "documents received": ["Initial points balance statement - Agnieszka Daskcombe.pdf. A single-page initial points balance statement for Agnieszka Daskcombe, dated 27 July 2026.", "Points transfer request - Agnieszka Daskcombe.pdf. A single-page points transfer request for Agnieszka Daskcombe, dated 23 May 2026, signed by the customer.", "Points transfer evidence statement - Agnieszka Daskcombe.pdf. A single-page points transfer evidence statement for Agnieszka Daskcombe, dated 26 August 2026, signed by the customer.", "Loyalty scheme enrolment form - Agnieszka Daskcombe.pdf. A single-page loyalty scheme enrolment form for Agnieszka Daskcombe, dated 12 May 2026, signed by the customer.", "Terms and conditions acceptance sheet - Agnieszka Daskcombe.pdf. A single-page terms and conditions acceptance sheet for Agnieszka Daskcombe, dated 9 July 2026, signed by the customer.", "Nominated store preference form - Agnieszka Daskcombe.pdf. A single-page nominated store preference form for Agnieszka Daskcombe, dated 16 June 2026, signed by the customer.", "Marketing consent form - Agnieszka Daskcombe.pdf. A single-page marketing consent form for Agnieszka Daskcombe, dated 28 August 2026, signed by the customer.", "Identity verification document - Agnieszka Daskcombe.pdf. A single-page identity verification document for Agnieszka Daskcombe, showing an expiry date of 20 May 2028."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 957}} {"id": "isc-te-00219-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Jaskton Partners", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "19 August 2026"}, "checklist": ["Operator licence: valid (not expired) on the date of the review.", "Franchise application form: signed.", "Fit-out cost estimate: issued within the last 6 months, signed.", "Pilot operation audit report: issued within the last 6 months, signed.", "If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement, valid (not expired) on the date of the review, signed.", "Funding agreement from a lender: issued within the last 3 months, signed."], "submission": {"case": {"name": "Lombness Inc", "reference": "VN-40580", "details": ["The franchise territory includes premises in a shopping centre."]}, "documents received": ["funding_agreement_VN-40580.pdf - Funding agreement from a lender for Lombness Inc. It shows a date of issue of 25 July 2026 and is signed by the lender. 6 pages, complete.", "fit_out_cost_estimate_VN-40580.pdf - Fit-out cost estimate for Lombness Inc. It shows a date of issue of 14 May 2026 and is signed by the fit-out contractor. 4 pages, complete.", "training_course_completion_certificate_VN-40580.pdf - Training course completion certificate for Lombness Inc. It shows a date of issue of 5 November 2025. Single page.", "franchise_application_form_VN-40580.pdf - Franchise application form for Lombness Inc. It shows a date of issue of 25 July 2026 and is signed by the franchisee applicant. 3 pages, complete.", "operator_licence_VN-40580.pdf - Operator licence for Lombness Inc. It shows an expiry date of 27 July 2027. 2 pages, complete.", "pilot_operation_audit_report_VN-40580.pdf - Pilot operation audit report for Lombness Inc. It shows a date of issue of 2 August 2026 and is signed by the pilot operation auditor. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 882}} {"id": "isc-te-00192-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Glenthorpe Inc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "3 April 2026"}, "checklist": ["Shareholder register extract issued within the last 3 months.", "Beneficial owner identification form, signed.", "Certificate of incorporation.", "Company tax registration certificate.", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents.", "Board resolution to open the account, signed.", "Company statutes, signed."], "submission": {"case": {"name": "Austshaw LLP", "reference": "DH-79163", "details": ["All beneficial owners of the company are residents."]}, "documents received": ["Certificate of incorporation - Austshaw LLP.pdf\nA certificate of incorporation for Austshaw LLP, dated 6 January 2026. Single page.", "Authorised signer identity document - Austshaw LLP.pdf\nAn authorised signer identity document for Austshaw LLP showing an expiry date of 29 January 2028. Single page.", "Shareholder register extract - Austshaw LLP.pdf\nA shareholder register extract for Austshaw LLP, dated 23 December 2025. 2 pages, complete.", "Company tax registration certificate - Austshaw LLP.pdf\nA company tax registration certificate for Austshaw LLP, dated 31 December 2025. Single page.", "Board resolution to open the account - Austshaw LLP.pdf\nA board resolution to open the account for Austshaw LLP, dated 2 February 2026. Single page. It is signed by a director.", "Beneficial owner identification form - Austshaw LLP.pdf\nA beneficial owner identification form for Austshaw LLP, dated 25 March 2026. 3 pages, complete. It is signed by a beneficial owner.", "Company statutes - Austshaw LLP.pdf\nCompany statutes for Austshaw LLP, dated 19 February 2026. 12 pages, complete. It is signed by a director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 807}} {"id": "isc-te-00439-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Boltfeld plc", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "4 August 2026"}, "checklist": ["Merchant account agreement, signed.", "Data protection impact assessment, issued within the last 12 months, signed.", "Fraud screening configuration sheet, signed.", "If the gateway will handle recurring subscription payments, also: subscription billing mandate template, signed.", "Gateway integration request form, signed.", "Test environment transaction log, issued within the last 1 months.", "Penetration test summary, issued within the last 6 months, signed."], "submission": {"case": {"name": "payment gateway DN-3787", "reference": "YB-55164", "details": ["The gateway will handle recurring subscription payments."]}, "documents received": ["Data protection impact assessment for payment gateway DN-3787. Dated 14 September 2025. 5 pages, complete. Signed by the data protection officer.", "Payment gateway technical specification for payment gateway DN-3787. Dated 29 May 2026. 8 pages, complete.", "Test environment transaction log for payment gateway DN-3787. Dated 20 July 2026. 4 pages, complete.", "Merchant account agreement for payment gateway DN-3787. Dated 11 June 2026. 6 pages, complete. Signed by the merchant account holder.", "Gateway integration request form for payment gateway DN-3787. Dated 4 June 2026. 2 pages, complete. Signed by the requesting manager.", "Penetration test summary for payment gateway DN-3787. Dated 19 February 2026. 3 pages, complete. Signed by the penetration tester.", "Fraud screening configuration sheet for payment gateway DN-3787. Dated 27 April 2026. Single page. Signed by the fraud screening lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 820}} {"id": "isc-te-00478-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Aldlund GmbH", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "9 September 2026"}, "checklist": ["Impact assessment on the team, signed", "Line manager opinion note, issued within the last 2 months, signed", "Previous flexible working requests record, issued within the last 24 months", "Flexible working request form, signed"], "submission": {"case": {"name": "Adaeze Tibescu", "reference": "CU-27722"}, "documents received": ["impact_assessment_team_adaeze_tibescu.pdf - Impact assessment on the team regarding Adaeze Tibescu, dated 23 May 2026. 3 pages, complete. Signed by the line manager.", "flexible_working_request_form_adaeze_tibescu_scanned.pdf - Flexible working request form regarding Adaeze Tibescu, dated 30 June 2026. 3 pages, complete. The last page is cropped, so the signature block cannot be seen and it is not known whether the form is signed.", "line_manager_opinion_note_adaeze_tibescu.pdf - Line manager opinion note regarding Adaeze Tibescu, dated 3 August 2026. 2 pages, complete. Signed by the line manager.", "previous_flexible_working_requests_record_adaeze_tibescu.pdf - Previous flexible working requests record regarding Adaeze Tibescu, dated 12 October 2024. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 701}} {"id": "isc-te-00239-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Pentlund Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "29 May 2026"}, "checklist": ["If the borrower is self-employed, also: two most recent tax year overviews (issued within the last 18 months, signed)", "P60 tax summary (issued within the last 15 months)", "gifted deposit letter (issued within the last 3 months, signed)", "three months of bank statements (issued within the last 3 months)", "mortgage application form (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Edward Gillnall", "reference": "JK-76860", "details": ["The borrower is not self-employed."]}, "cover note": "Please accept my apologies for the pack being put together in a rush. Joseph Tadski", "documents received": ["Mortgage application form for Edward Gillnall. Date of issue: 8 April 2026. 10 pages, complete, signed by the borrower.", "Property valuation report for Edward Gillnall. Date of issue: 22 May 2026. 8 pages, complete, signed by the valuer.", "Gifted deposit letter for Edward Gillnall. Date of issue: 7 April 2026. Single page, signed by the donor.", "Three months of bank statements for Edward Gillnall. Date of issue: 15 April 2026. 9 pages, complete.", "P60 tax summary for Edward Gillnall. Date of issue: 5 August 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 742}} {"id": "isc-te-00348-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Ilvmark Group", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "10 March 2026"}, "checklist": ["Check the pack contains a goodwill gesture approval note issued within the last 1 months and signed.", "If the complaint alleges a member of staff behaved rudely, also check the pack contains a staff member written response, signed.", "Check the pack contains a customer contact log issued within the last 3 months.", "If the complaint involves a data protection concern, also check the pack contains a data protection impact note issued within the last 1 months and signed.", "Check the pack contains a store incident report issued within the last 3 months and signed.", "Check the pack contains a complaint escalation form issued within the last 1 months and signed."], "submission": {"case": {"name": "escalated complaint HX-18721", "reference": "QF-35170", "details": ["The complaint alleges a member of staff behaved rudely.", "The complaint involves a data protection concern."]}, "documents received": ["Staff member written response HX-18721.pdf. This staff member written response about escalated complaint HX-18721 is dated 6 February 2026. It is a single page and is signed by the staff member who wrote it.", "Complaint escalation form HX-18721.pdf. This complaint escalation form about escalated complaint HX-18721 is dated 7 March 2026. It has 2 pages, complete, and is signed by the case handler.", "Data protection impact note HX-18721.pdf. This data protection impact note about escalated complaint HX-18721 is dated 28 February 2026. It has 2 pages, complete, and is signed by the data protection officer.", "Customer contact log HX-18721 (pages 1 to 1 of 3).pdf. This customer contact log about escalated complaint HX-18721 is dated 27 January 2026. Only pages 1 to 1 of 3 are included.", "Store incident report HX-18721.pdf. This store incident report about escalated complaint HX-18721 is dated 3 February 2026. It has 2 pages, complete, and is signed by the store manager.", "Policy breach summary HX-18721.pdf. This policy breach summary about escalated complaint HX-18721 is dated 20 January 2026. It has 2 pages, complete, and is signed by the compliance officer.", "Goodwill gesture approval note HX-18721.pdf. This goodwill gesture approval note about escalated complaint HX-18721 is dated 8 March 2026. It is a single page and carries the signature of the customer relations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1028}} {"id": "isc-te-00047-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Teskbrook GmbH", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "17 March 2026"}, "checklist": ["Check that the audit summary report is present and signed.", "Check that the audit finding sheets are present and signed.", "Check that the internal audit plan is present, was issued within the last 12 months, and is signed.", "Check that the management review minutes are present and signed.", "If the audit found a major non-conformity, also check that the major non-conformity corrective action plan is present and signed."], "submission": {"case": {"name": "internal audit HH-1805", "reference": "IG-20637", "details": ["The audit found a major non-conformity."]}, "documents received": ["Audit finding sheets HH-1805. Issued 1 January 2026, 2 pages, complete. Signed by the lead auditor.", "Management review minutes HH-1805. Issued 13 February 2026, 4 pages, complete. Signed by the chair of the review board.", "Audit summary report HH-1805. Issued 3 February 2026, 5 pages, complete. Signed by the lead auditor.", "Internal audit plan HH-1805. The date of issue is covered by a stamp. 2 pages, complete. Signed by the quality manager.", "Audit attendance sheet HH-1805. Issued 8 February 2026, a single page. Signed by the lead auditor.", "Major non-conformity corrective action plan HH-1805. Issued 10 December 2025, 3 pages, complete. Signed by the quality manager.", "Previous audit follow-up record HH-1805. Issued 21 April 2024, 2 pages, complete. Signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00080-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Morvfell & Co", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "26 August 2026"}, "checklist": ["Root cause analysis report, issued within the last 3 months and signed.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Service level objective breach record, issued within the last 3 months.", "Follow-up owner assignment sheet, issued within the last 3 months and signed.", "Alerting rules review note, issued within the last 3 months."], "submission": {"case": {"name": "production incident VT-77812", "reference": "UP-54074"}, "documents received": ["Root cause analysis report for production incident VT-77812, dated 7 July 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Service level objective breach record for production incident VT-77812, dated 29 June 2026. Single page.", "Incident timeline for production incident VT-77812, dated 8 July 2026. 3 pages, complete.", "Alerting rules review note for production incident VT-77812, dated 21 June 2026. 2 pages, complete.", "Postmortem meeting minutes for production incident VT-77812, dated 20 July 2026. 3 pages, complete. Signed by the chair of the postmortem meeting."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 716}} {"id": "isc-te-00166-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Oxlside Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "17 August 2026"}, "checklist": ["Confirm the pack contains the nominated store preference form, signed.", "Confirm the pack contains the customer contact details sheet, signed.", "Confirm the pack contains the loyalty scheme enrolment form, signed.", "Confirm the pack contains an identity verification document that is valid, that is not expired, on the date of the review, 17 August 2026.", "If the customer is transferring points from a rival scheme, also confirm the pack contains a points transfer evidence statement, issued within the last 3 months and signed."], "submission": {"case": {"name": "Rhys Elmcroft", "reference": "ZK-30863", "details": ["The customer is transferring points from a rival scheme."]}, "cover note": "I am not fully sure that everything needed is included here, so please take a look. Thanks, Lena Wolmery.", "documents received": ["initial_points_balance_statement_rhys_elmcroft.pdf: Initial points balance statement for Rhys Elmcroft, issued on 22 July 2026. It is 1 page.", "points_transfer_request_rhys_elmcroft.pdf: Points transfer request for Rhys Elmcroft, issued on 1 August 2026. It is 1 page and is signed by the customer.", "customer_contact_details_sheet_rhys_elmcroft.pdf: Customer contact details sheet for Rhys Elmcroft, issued on 22 April 2026. It is 1 page and is signed by the customer.", "loyalty_scheme_enrolment_form_rhys_elmcroft.pdf: Loyalty scheme enrolment form for Rhys Elmcroft, issued on 23 July 2026. It is 1 page and is signed by the customer.", "points_transfer_evidence_statement_rhys_elmcroft.pdf: Points transfer evidence statement for Rhys Elmcroft, issued on 15 August 2026. It is 1 page and is signed by the issuing scheme's representative.", "identity_verification_document_rhys_elmcroft.pdf: Identity verification document for Rhys Elmcroft, showing an expiry date of 12 May 2028. It is 1 page.", "store_locator_map_printout_rhys_elmcroft.pdf: Store locator map printout for Rhys Elmcroft, issued on 2 May 2026. It is 1 page and is signed by the customer.", "nominated_store_preference_form_rhys_elmcroft.pdf: Nominated store preference form for Rhys Elmcroft, issued on 2 May 2026. It is 1 page and is signed by the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1008}} {"id": "isc-te-00233-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Oxlfield SAS", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "6 March 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "Account request form, signed", "Content escalation route, signed", "Naming convention approval, signed"], "submission": {"case": {"name": "new social media account WD-87625", "reference": "WM-51560"}, "documents received": ["Naming convention approval WD-87625.pdf. This single-page naming convention approval for new social media account WD-87625 shows its date of issue as 6 February 2026 and carries the signature of the brand governance manager.", "Account request form WD-87625.pdf. This single-page account request form for new social media account WD-87625 shows its date of issue as 10 December 2025 and carries the signature of the marketing team lead.", "Admin access list WD-87625.pdf. This single-page admin access list for new social media account WD-87625 shows its date of issue as 31 December 2025.", "Content escalation route WD-87625.pdf. This single-page content escalation route for new social media account WD-87625 shows its date of issue as 15 November 2025 and carries the signature of the marketing team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 703}} {"id": "isc-te-00440-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vornshaw Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "26 June 2026"}, "checklist": ["Check that the pack contains the proposed architecture diagram.", "Check that the pack contains the review board feedback summary, issued within the last 3 months and signed.", "Check that the pack contains the security threat model, issued within the last 6 months.", "If the design introduces a new third-party dependency, also check that the pack contains the third-party dependency risk assessment, issued within the last 6 months and signed.", "Check that the pack contains the alternatives considered table.", "Check that the pack contains the cost estimate sheet, issued within the last 6 months."], "submission": {"case": {"name": "design document HR-11465", "reference": "YD-70116", "details": ["The design introduces no new third-party dependency."]}, "cover note": "I apologise that the pack was put together in a rush.", "documents received": ["HR-11465 capacity and load estimate 16 February 2026.pdf - Capacity and load estimate about design document HR-11465, showing a date of issue of 16 February 2026. 3 pages, complete.", "HR-11465 security threat model 28 April 2026.pdf - Security threat model about design document HR-11465, showing a date of issue of 28 April 2026. 4 pages, complete.", "HR-11465 review board feedback summary 17 May 2026.pdf - Review board feedback summary about design document HR-11465, showing a date of issue of 17 May 2026. 2 pages, complete. Signed by the architecture review board chair.", "HR-11465 cost estimate sheet 28 February 2026.pdf - Cost estimate sheet about design document HR-11465, showing a date of issue of 28 February 2026. 2 pages, complete.", "HR-11465 proposed architecture diagram 27 May 2026.pdf - Proposed architecture diagram about design document HR-11465, showing a date of issue of 27 May 2026. A single page.", "HR-11465 alternatives considered table 4 March 2026.pdf - Alternatives considered table about design document HR-11465, showing a date of issue of 4 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 958}} {"id": "isc-te-00359-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Ilvbrook Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "17 July 2026"}, "checklist": ["Hotel availability printout, issued within the last 1 month and signed", "Package holiday brochure page", "If the booking includes a car hire, also: car hire quotation, issued within the last 1 month", "Passport details form, signed", "Flight availability printout, issued within the last 1 month", "Travel insurance quote, issued within the last 1 month", "Booking request form, signed"], "submission": {"case": {"name": "holiday booking FU-13646", "reference": "DM-77175", "details": ["The booking includes a car hire."]}, "documents received": ["Passport details form for holiday booking FU-13646, dated 24 April 2026. Single page. Signed by the customer.", "Hotel availability printout for holiday booking FU-13646, dated 28 June 2026. 2 pages, complete. Signed by the reservations manager.", "Flight availability printout for holiday booking FU-13646, dated 10 July 2026. 2 pages, complete.", "Booking request form for holiday booking FU-13646, dated 3 July 2026. 2 pages, complete. Signed by the reservations clerk.", "Customer deposit receipt for holiday booking FU-13646, dated 20 May 2026. Single page.", "Travel insurance quote for holiday booking FU-13646, dated 5 July 2026. 2 pages, complete.", "Package holiday brochure page for holiday booking FU-13646, dated 29 April 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack is complete per the checklist. Go over every checklist line that applies to this case. Only a document of the listed kind counts (not a similar one), and it must be about the case's subject, have all its pages, be signed wherever the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: at least one applicable line is not satisfied. unclear: no line is clearly not met, but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-9", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 789}} {"id": "isc-te-00227-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Gravlock plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "24 June 2026"}, "checklist": ["supplier quality questionnaire, issued within the last 12 months, signed", "supplier capacity declaration, issued within the last 12 months, signed", "supplier audit report, issued within the last 24 months, signed", "supplier corrective action plan, issued within the last 6 months, signed", "financial stability statement, issued within the last 12 months, signed", "certified quality management system certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Mersheim BV", "reference": "TB-65922"}, "cover note": "Please accept my apologies - this pack was assembled at short notice and in something of a rush, so thank you for bearing with us. Sofia Daskberg", "documents received": ["TB-65922_supplier_quality_questionnaire_Mersheim.pdf - Supplier quality questionnaire for Mersheim BV. Date of issue: 19 November 2025. 4 pages, complete. Signed by the supplier's quality manager.", "TB-65922_supplier_audit_report_Mersheim.pdf - Supplier audit report for Mersheim BV. Date of issue: 2 July 2025. 8 pages, complete. Signed by the lead auditor.", "TB-65922_financial_stability_statement_Mersheim.pdf - Financial stability statement for Mersheim BV. Date of issue: 11 April 2026. 2 pages, complete. Signed by the supplier's finance director.", "TB-65922_certified_qms_certificate_Mersheim.pdf - Certified quality management system certificate for Mersheim BV. Expiry date: 19 October 2028. Single page.", "TB-65922_supplier_corrective_action_plan_Mersheim.pdf - Supplier corrective action plan for Mersheim BV. Date of issue: 11 March 2026. 3 pages, complete. Signed by the supplier's quality manager.", "TB-65922_raw_material_certificate_of_analysis_Mersheim.pdf - Raw material certificate of analysis for Mersheim BV. Date of issue: 18 February 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "TB-65922_supplier_capacity_declaration_Mersheim.pdf - Supplier capacity declaration for Mersheim BV. Date of issue: 7 July 2025. 2 pages, complete. Signed by the supplier's operations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 956}} {"id": "isc-te-00398-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Prydhaven Ltd", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "3 July 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include the mediation request confirmation, issued within the last 1 months and signed", "Cure period expiry calculation, issued within the last 1 months and signed", "Losses calculation statement, issued within the last 1 months and signed", "Breach evidence log, issued within the last 1 months and signed", "Default notice previously served, issued within the last 6 months and signed", "Termination clause legal opinion, issued within the last 1 months and signed", "Original service agreement copy"], "submission": {"case": {"name": "Aldstow Group", "reference": "KZ-59584", "details": ["The contract requires a dispute to go to mediation first."]}, "cover note": "Here is the pack for review. I am not sure everything needed is there.", "documents received": ["Losses_calculation_statement_Aldstow_Group_13_June_2026.pdf — Losses calculation statement concerning Aldstow Group, dated 13 June 2026. 3 pages, complete. Signed by the Finance Director.", "Cure_period_expiry_calculation_Aldstow_Group_18_June_2026.pdf — Cure period expiry calculation concerning Aldstow Group, dated 18 June 2026. 2 pages, complete. Signed by the Contracts Manager.", "Litigation_hold_notice_Aldstow_Group_17_June_2026.pdf — Litigation hold notice concerning Aldstow Group, dated 17 June 2026. 2 pages, complete. Signed by the Head of Legal Services.", "Termination_clause_legal_opinion_Aldstow_Group_1_July_2026.pdf — Termination clause legal opinion concerning Aldstow Group, dated 1 July 2026. 5 pages, complete. Signed by the Legal Counsel.", "Original_service_agreement_copy_Aldstow_Group_23_April_2026.pdf — Original service agreement copy concerning Aldstow Group, dated 23 April 2026. 10 pages, complete.", "Mediation_request_confirmation_Aldstow_Group_29_June_2026.pdf — Mediation request confirmation concerning Aldstow Group, dated 29 June 2026. 1 page. Signed by the Head of Dispute Resolution.", "Default_notice_previously_served_Aldstow_Group_16_June_2026.pdf — Default notice previously served on Aldstow Group, dated 16 June 2026. 1 page. Signed by the Contracts Manager.", "Breach_evidence_log_Aldstow_Group_13_June_2026.pdf — Breach evidence log concerning Aldstow Group, dated 13 June 2026. 6 pages, complete. Signed by the Contract Compliance Officer."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case, one by one. A required document counts only if: it is the kind of document listed (not a similar one); it is about the subject of the case; it has all its pages; it is signed where the checklist asks for a signature; it has not expired on the date of the review; and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "signed", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-2", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1059}} {"id": "isc-te-00112-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lunhall Ltd", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "2 July 2026"}, "checklist": ["If the move includes taking furniture to a storage unit, also: storage unit access authorisation (signed)", "lifting equipment inspection report (issued within the last 6 months, signed)", "IT decommissioning certificate (issued within the last 1 months, signed)", "new floor snagging list (issued within the last 1 months, signed)", "movers insurance certificate (valid (not expired) on the date of the review)", "signed move plan (signed)", "crate hire agreement (signed)"], "submission": {"case": {"name": "office move project VB-98815", "reference": "KT-58591", "details": ["The move includes taking furniture to a storage unit."]}, "documents received": ["KT-58591 Parking bay suspension approval VB-98815.pdf. This is a one-page parking bay suspension approval for office move project VB-98815, dated 18 June 2026. It has been signed by the local authority parking officer.", "KT-58591 Crate hire agreement VB-98815.pdf. This is a crate hire agreement for office move project VB-98815, dated 9 June 2026. 2 pages, complete. It has been signed by the supplier's representative.", "KT-58591 New floor snagging list VB-98815.pdf. This is a new floor snagging list for office move project VB-98815, dated 5 June 2025. 3 pages, complete. It has been signed by the site manager.", "KT-58591 Furniture inventory list VB-98815.pdf. This is a furniture inventory list for office move project VB-98815, dated 19 June 2026. 4 pages, complete. It has been signed by the facilities coordinator.", "KT-58591 Lifting equipment inspection report VB-98815.pdf. This is a lifting equipment inspection report for office move project VB-98815, dated 16 February 2026. 2 pages, complete. It has been signed by the lifting equipment inspector.", "KT-58591 Signed move plan VB-98815.pdf. This is a signed move plan for office move project VB-98815, dated 11 June 2026. 6 pages, complete. It has been signed by the project manager.", "KT-58591 IT decommissioning certificate VB-98815.pdf. This is a one-page IT decommissioning certificate for office move project VB-98815, dated 16 June 2026. It has been signed by the IT manager.", "KT-58591 Storage unit access authorisation VB-98815.pdf. This is a one-page storage unit access authorisation for office move project VB-98815, dated 4 June 2026. It has been signed by the facilities manager.", "KT-58591 Movers insurance certificate VB-98815.pdf. This is a one-page movers insurance certificate for office move project VB-98815. It shows an expiry date of 20 May 2027."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1150}} {"id": "isc-te-00313-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Istshaw Partners", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "31 July 2026"}, "checklist": ["Cross-dock slot booking sheet, issued within the last 1 months and signed.", "Inbound unloading record, issued within the last 1 months and signed.", "Seal number log, issued within the last 1 months and signed.", "Transfer completion confirmation, issued within the last 1 months and signed.", "Load consolidation sheet, issued within the last 3 months and signed.", "If the transfer is an international movement, also: transit customs document, signed.", "Outbound loading record, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer TG-84110", "reference": "CV-81739", "details": ["The transfer is an international movement."]}, "cover note": "I apologise that this pack was put together in a rush. I would be grateful for your patience as you go through it.", "documents received": ["Outbound loading record for cross-dock transfer TG-84110, dated 24 July 2026. Single page. Signed by the outbound loading team leader.", "Seal number log for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the outbound gatekeeper.", "Transfer completion confirmation for cross-dock transfer TG-84110, dated 12 July 2026. Single page. Signed by the transport planner.", "Transit customs document for cross-dock transfer TG-84110, dated 26 June 2026. 4 pages, complete. Signed by the customs agent.", "Damaged goods exception sheet for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the warehouse operative.", "Cross-dock slot booking sheet for cross-dock transfer TG-84110, dated 21 July 2026. Single page. Signed by the cross-dock coordinator.", "Load consolidation sheet for cross-dock transfer TG-84110, dated 26 July 2026. 2 pages, complete. Signed by the load consolidation coordinator.", "Inbound unloading record for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the inbound unloading supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "partial", "defect": "signed", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 931}} {"id": "isc-te-00246-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Glenmark Inc", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "13 July 2026"}, "checklist": ["Obtain proof of savings, issued within the last 2 months.", "Obtain recent bank statements, issued within the last 2 months.", "Obtain a benefit claim form that is valid (not expired) on the date of the review and signed.", "If the claimant has a non-dependant adult living in the household, also obtain a non-dependant income details form, signed.", "Obtain proof of national insurance number.", "Obtain proof of identity that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "Arjun Ingford", "reference": "TO-48296", "details": ["The claimant has a non-dependant adult living in the household."]}, "documents received": ["Benefit claim form for Arjun Ingford. Expiry date: 22 September 2027. 12 pages, complete. Signed by the claimant.", "Recent bank statements for Arjun Ingford. Date of issue: 20 June 2026. 12 pages, complete.", "Proof of national insurance number for Arjun Ingford. Date of issue: 30 April 2026. Single page.", "File: document_001.pdf. The file will not open, so its contents cannot be seen.", "Non-dependant income details form for Arjun Ingford. Date of issue: 29 June 2026. 2 pages, complete. Signed by the non-dependant.", "Proof of identity for Arjun Ingford. Expiry date: 24 July 2028. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 763}} {"id": "isc-te-00180-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Weskfield SAS", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "24 July 2026"}, "checklist": ["Confirm the pack includes the rollback plan, signed.", "Confirm the pack includes the firewall change request form, signed.", "Confirm the pack includes the current rule set export, issued within the last 1 months.", "Confirm the pack includes the peer review checklist, issued within the last 1 months, signed."], "submission": {"case": {"name": "firewall change GH-61214", "reference": "TJ-47386"}, "documents received": ["peer_review_checklist_GH-61214.pdf — Peer review checklist for firewall change GH-61214, dated 13 July 2026. Single page. Signed by the peer reviewer.", "proposed_rule_change_spec_GH-61214.pdf — Proposed rule change specification for firewall change GH-61214, dated 3 June 2026. 2 pages, complete. Signed by the network engineer who prepared the specification.", "rollback_plan_GH-61214.pdf — Rollback plan for firewall change GH-61214, dated 22 May 2026. 2 pages, complete. Signed by the network security team lead.", "current_rule_set_export_GH-61214.pdf — Current rule set export for firewall change GH-61214, dated 11 July 2026. 8 pages, complete.", "firewall_change_request_GH-61214.pdf — Firewall change request form for firewall change GH-61214, dated 13 July 2026. 3 pages, complete. Signed by the requesting change manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 778}} {"id": "isc-te-00151-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ivrlund BV", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "12 May 2026"}, "checklist": ["Line manager approval, signed.", "Flight itinerary quote, issued within the last 1 months.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Hotel booking confirmation.", "Travel request form, signed.", "If the traveller is not a passport holder of the destination country, also: work permit confirmation.", "Travel policy acknowledgement, signed."], "submission": {"case": {"name": "business trip JP-14209", "reference": "DD-15730", "details": ["The traveller holds a passport of the destination country."]}, "documents received": ["Line-manager-approval-JP-14209.pdf. A single-page line manager approval for business trip JP-14209, issued on 11 April 2026. It carries the signature of the line manager.", "Travel-policy-acknowledgement-JP-14209.pdf. A single-page travel policy acknowledgement for business trip JP-14209, issued on 27 April 2026. It carries the signature of the traveller.", "Travel-request-form-JP-14209.pdf. A travel request form for business trip JP-14209, issued on 21 March 2026. 2 pages, complete. It is signed by the traveller.", "File-002.pdf. The file will not open, so its contents cannot be seen.", "Hotel-booking-confirmation-JP-14209.pdf. A hotel booking confirmation for business trip JP-14209, issued on 15 March 2026. 2 pages, complete.", "Passport-copy-JP-14209.pdf. A single-page passport copy for international travel for business trip JP-14209, showing an expiry date of 8 December 2027."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00262-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Baxberg Inc", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "24 March 2026"}, "checklist": ["Privacy policy update, issued within the last 3 months.", "Age rating questionnaire, signed.", "Crash-free rate report, issued within the last 1 months.", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months, signed.", "Release notes, issued within the last 1 months.", "Store listing description, issued within the last 1 months.", "Marketing screenshot pack."], "submission": {"case": {"name": "mobile app release KP-37893", "reference": "MT-55379", "details": ["The mobile app release includes no third-party analytics."]}, "documents received": ["KP-37893_store_listing_description.pdf — A store listing description for mobile app release KP-37893, dated 7 March 2026. A single page.", "KP-37893_privacy_policy_update.pdf — A privacy policy update for mobile app release KP-37893, dated 14 January 2026. 2 pages, complete.", "KP-37893_crash_free_rate_report.pdf — A crash-free rate report for mobile app release KP-37893, dated 12 March 2026. A single page.", "KP-37893_marketing_screenshot_pack.pdf — A marketing screenshot pack for mobile app release KP-37893, dated 23 January 2026. 6 pages, complete.", "KP-37893_localisation_completeness_report.pdf — A localisation completeness report for mobile app release KP-37893, dated 16 March 2026. 2 pages, complete.", "KP-37893_release_notes_undated.pdf — Release notes for mobile app release KP-37893. The date of issue is smudged and cannot be read. 2 pages, complete.", "KP-37893_age_rating_questionnaire.pdf — An age rating questionnaire for mobile app release KP-37893, dated 26 January 2026. It carries the signature of the release manager. 2 pages, complete.", "KP-37893_device_compatibility_matrix.pdf — A device compatibility matrix for mobile app release KP-37893, dated 28 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 955}} {"id": "isc-te-00278-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Wendwyn Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "7 September 2026"}, "checklist": ["Sales invoice or receipt for the sale proceeds, issued within the last 3 months.", "Signed asset disposal request form.", "Signed board or budget holder approval for the disposal.", "Signed asset de-registration and tag removal record."], "submission": {"case": {"name": "disposed asset FF-78187", "reference": "WP-26906"}, "documents received": ["Board or budget holder approval for the disposal - FF-78187 - 17 May 2026. A single-page board or budget holder approval for the disposal of asset FF-78187, dated 17 May 2026, signed by a director on behalf of the board.", "Asset disposal request form - FF-78187 - 22 July 2026. 2 pages, complete. The asset disposal request form for disposed asset FF-78187, dated 22 July 2026, signed by the requesting budget holder.", "Sales invoice for sale proceeds - FF-78187 - 27 July 2026. A single-page sales invoice or receipt for the sale proceeds relating to disposed asset FF-78187, dated 27 July 2026.", "Fixed asset register extract for the asset - FF-78187 - 8 July 2026. A single-page fixed asset register extract for the asset FF-78187, dated 8 July 2026.", "Asset de-registration and tag removal record - FF-78187 - 12 August 2026. A single-page asset de-registration and tag removal record for disposed asset FF-78187, dated 12 August 2026. The signature line is empty, so the record is not signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 819}} {"id": "isc-te-00088-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Aldmouth Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "23 April 2026"}, "checklist": ["Customer deposit receipt, issued within the last 3 months.", "Package holiday brochure page.", "Booking request form, signed.", "Travel insurance quote, issued within the last 1 months.", "Passport details form, signed.", "If the booking includes a car hire, also: car hire quotation, issued within the last 1 months.", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review."], "submission": {"case": {"name": "holiday booking HK-33923", "reference": "LS-73051", "details": ["The booking includes a car hire.", "The booking includes a child traveller."]}, "documents received": ["Car hire quotation for holiday booking HK-33923. Date of issue: 11 April 2026. 2 pages, complete.", "Booking request form for holiday booking HK-33923. Date of issue: 6 January 2026. 2 pages, complete. Signed by the customer.", "Flight availability printout for holiday booking HK-33923. Date of issue: 12 April 2026. 2 pages, complete.", "Customer deposit receipt for holiday booking HK-33923. Date of issue: 10 April 2026. 1 page.", "Hotel availability printout for holiday booking HK-33923. Date of issue: 5 April 2026. 2 pages, complete. Signed by the reservations clerk.", "Package holiday brochure page for holiday booking HK-33923. Date of issue: 17 January 2026. 1 page.", "Travel insurance quote for holiday booking HK-33923. Date of issue: 10 April 2026. 2 pages, complete.", "Passport details form for holiday booking HK-33923. Date of issue: 10 April 2026. 1 page. Signed by the customer.", "Child passport copy for holiday booking HK-33923. Expiry date: 20 February 2028. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 898}} {"id": "isc-te-00333-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Iskwald Limited", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "3 April 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed.", "Anti-bribery policy statement, signed.", "Certificate of insurance, valid (not expired) on the date of the review.", "Signed copy of the general terms and conditions, signed."], "submission": {"case": {"name": "Dundfeld Ltd", "reference": "GD-75611"}, "cover note": "I would be grateful for quick approval on this one, as all the paperwork is in order. Thank you.", "documents received": ["Signed copy of the general terms and conditions for Dundfeld Ltd, dated 10 March 2026. 6 pages, complete. Signed by a company director.", "Bank details confirmation letter for Dundfeld Ltd, dated 14 January 2026. Single page. Signed by a bank officer.", "Certificate of insurance for Dundfeld Ltd, expiring 24 January 2028. 2 pages, complete.", "Anti-bribery policy statement for Dundfeld Ltd, dated 22 January 2026. Pages 1 to 2 of an unstated total are included. Signed by a company director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 670}} {"id": "isc-te-00210-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jundstead BV", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "20 April 2026"}, "checklist": ["Production downtime log - confirm it was issued within the last 3 months and is signed", "Purchase invoice for the machine", "Repair or replacement quotation - confirm it was issued within the last 3 months", "Equipment breakdown claim form - confirm it is signed"], "submission": {"case": {"name": "failed machine BH-86750", "reference": "XI-70320"}, "documents received": ["Production downtime log for failed machine BH-86750. Date of issue: 6 February 2026. 2 pages, complete. Signed by the production supervisor.", "Equipment breakdown claim form for failed machine BH-86750. Date of issue: 30 January 2026. 3 pages, complete. Signed by the policyholder.", "Repair or replacement quotation for failed machine BH-86750. Date of issue: 5 March 2026. 2 pages, complete.", "Purchase invoice for the machine, for failed machine BH-86750. Date of issue: 11 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 659}} {"id": "isc-te-00009-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ivrwater Group", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "31 August 2026"}, "checklist": ["Confirm the pack contains a depreciation schedule for the asset to date.", "Confirm the pack contains signed board or budget holder approval for the disposal.", "Confirm the pack contains a fixed asset register extract for the asset.", "Confirm the pack contains a sales invoice or receipt for the sale proceeds, issued within the last 3 months.", "If the asset is a company car being part-exchanged, also: confirm the pack contains a part-exchange valuation from the dealer, issued within the last 3 months."], "submission": {"case": {"name": "disposed asset VI-76793", "reference": "CJ-14842", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Sales invoice or receipt for the sale proceeds for disposed asset VI-76793, dated 10 August 2026. Single page.", "Depreciation schedule for the asset to date for disposed asset VI-76793, dated 17 May 2026. 2 pages, complete.", "Board or budget holder approval for the disposal of disposed asset VI-76793, dated 29 June 2026. Single page, signed by the group finance director.", "Part-exchange valuation from the dealer for disposed asset VI-76793, dated 26 June 2026. Single page.", "Written offer or valuation for the asset for disposed asset VI-76793, dated 10 July 2026. 2 pages, complete.", "Asset disposal request form for disposed asset VI-76793, dated 14 June 2026. 2 pages, complete, signed by the requesting department manager.", "Fixed asset register extract for the asset for disposed asset VI-76793, dated 17 July 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00100-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Elvwell Group", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "23 April 2026"}, "checklist": ["Bank statement (issued within the last 3 months)", "If the property is a new build, also: new build warranty certificate", "Sale and purchase agreement (signed)", "Property valuation report (issued within the last 6 months, signed)", "Proof of deposit (issued within the last 3 months)", "Mortgage application form (signed)"], "submission": {"case": {"name": "property NL-32293", "reference": "OP-43626", "details": ["The property is a new build."]}, "documents received": ["New_build_warranty_certificate_NL-32293.pdf - New build warranty certificate for property NL-32293. Date of issue: 1 February 2026. 3 pages, complete.", "Proof_of_deposit_NL-32293.pdf - Proof of deposit for property NL-32293. Date of issue: 23 February 2026. 1 page.", "Bank_statement_NL-32293.pdf - Bank statement for property NL-32293. Date of issue: 3 April 2026. 3 pages, complete.", "Photo_identity_document_NL-32293.pdf - Photo identity document for property NL-32293. Expiry date: 15 August 2026. 1 page.", "Property_valuation_report_NL-32293.pdf - Property valuation report for property NL-32293. Date of issue: 8 December 2025. 10 pages, complete. Signed by the valuer.", "Sale_and_purchase_agreement_NL-32293.pdf - Sale and purchase agreement for property NL-32293. Date of issue: 9 January 2026. 9 pages, complete. Signed by the buyer and the seller.", "Mortgage_application_form_NL-32293.pdf - Mortgage application form for property NL-32293. Date of issue: 10 March 2026. 6 pages, complete. Signed by the applicant."]}}, "question": {"type": "choice", "instructions": "The decision required is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-67", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 890}} {"id": "isc-te-00052-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Yarvham GmbH", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "7 May 2026"}, "checklist": ["Naming convention approval, signed", "Account purpose statement", "Platform terms acceptance record, signed", "Two-factor authentication confirmation issued within the last 3 months", "If the account will be run by an external agency, also: agency access agreement, signed", "If the account will post content about financial products, also: financial promotions approval note, signed and issued within the last 3 months", "Account request form, signed", "Content escalation route, signed"], "submission": {"case": {"name": "new social media account AR-54483", "reference": "HK-37859", "details": ["The account will be run entirely by in-house staff.", "The account will post content about financial products."]}, "documents received": ["Account purpose statement AR-54483.pdf. This is a single-page account purpose statement for new social media account AR-54483, dated 28 January 2026.", "Platform terms acceptance record AR-54483.pdf. This is a single-page platform terms acceptance record for new social media account AR-54483, dated 26 February 2026, and it is signed by the social media governance lead.", "Content escalation route AR-54483.pdf. This is a single-page content escalation route for new social media account AR-54483, dated 13 April 2026, and it is signed by the social media governance lead.", "Two-factor authentication confirmation AR-54483 15 February 2026.pdf. This is a single-page two-factor authentication confirmation for new social media account AR-54483, dated 15 February 2026.", "Account request form AR-54483.pdf. This is a single-page account request form for new social media account AR-54483, dated 21 February 2026, and it is signed by the requesting marketing manager.", "Naming convention approval AR-54483.pdf. This is a single-page naming convention approval for new social media account AR-54483, dated 27 April 2026, and it is signed by the social media governance lead.", "Financial promotions approval note AR-54483.pdf. This is a financial promotions approval note for new social media account AR-54483, dated 24 April 2026. It is 2 pages, complete, and it is signed by the financial promotions approver."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-6", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 972}} {"id": "isc-te-00267-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Yselcombe LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "6 July 2026"}, "checklist": ["Insurance excess waiver certificate, valid (not expired) on the date of the review.", "Passport, valid (not expired) on the date of the review, and signed.", "Fuel policy sheet, signed.", "Additional driver authorisation form, signed.", "Vehicle condition report, signed.", "Booking voucher, issued within the last 6 months.", "If the booking includes crossing a land border, also: cross-border travel permission, signed."], "submission": {"case": {"name": "Thomas Yellworth", "reference": "KU-46488", "details": ["The booking stays within one country."]}, "documents received": ["Driving licence for Thomas Yellworth. It shows an expiry date of 22 September 2028 and is signed by the holder, Thomas Yellworth. It is 2 pages, complete.", "Additional driver authorisation form for Thomas Yellworth. It shows a date of issue of 26 June 2026 and is signed by the hirer, Thomas Yellworth. It is 1 page.", "Booking voucher for Thomas Yellworth. It shows a date of issue of 7 June 2026. It is 1 page.", "Vehicle condition report for Thomas Yellworth. It shows a date of issue of 18 May 2026 and is signed by the counter agent. It is 2 pages, complete.", "Insurance excess waiver certificate for Thomas Yellworth. It shows an expiry date of 4 May 2027. 2 pages, complete.", "Fuel policy sheet for Thomas Yellworth. It shows a date of issue of 24 May 2026 and is signed by the hirer, Thomas Yellworth. It is 1 page.", "Passport for Thomas Yellworth. The date field is covered by an ink stamp, so the date cannot be seen, and it is signed by the bearer, Thomas Yellworth. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Work through every checklist line that applies to this case one by one. For a required document to count, it must be the exact kind of document listed (not a similar one), be about the subject of the case, contain all its pages, be signed where the checklist asks for a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line only applies when its circumstance holds for the case. complete: all applicable lines are met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-68", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 846}} {"id": "isc-te-00062-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ulmvik Inc", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 August 2026"}, "checklist": ["Trip cost estimate, signed.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Flight itinerary quote, issued within the last 1 months.", "Travel request form, signed.", "If the traveller is not a passport holder of the destination country, also: work permit confirmation.", "Visa entry requirement printout, issued within the last 3 months.", "Line manager approval, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter."], "submission": {"case": {"name": "business trip ER-6840", "reference": "NK-56978", "details": ["The traveller is not a passport holder of the destination country.", "The trip involves travel to a country requiring a visa."]}, "documents received": ["Line manager approval for business trip ER-6840, dated 16 August 2026. Single page. Signed by the line manager.", "Travel policy acknowledgement for business trip ER-6840, dated 14 July 2026. Single page. Signed by the traveller.", "Visa approval letter for business trip ER-6840, dated 11 June 2026. 2 pages, complete.", "Visa entry requirement printout for business trip ER-6840; its date cannot be seen, as it is smudged. 2 pages, complete.", "Travel request form for business trip ER-6840, dated 21 June 2026. 2 pages, complete. Signed by the traveller.", "Flight itinerary quote for business trip ER-6840, dated 19 August 2026. 2 pages, complete.", "Work permit confirmation for business trip ER-6840, dated 6 May 2026. 2 pages, normal complete.", "Trip cost estimate for business trip ER-6840, dated 11 August 2026. Single page. Signed by the travel coordinator.", "Passport copy for international travel for business trip ER-6840, showing an expiry date of 12 February 2028. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "expired", "defect": "date not visible", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00312-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Abrbury Ltd", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "26 May 2026"}, "checklist": ["Outbound loading record issued within the last 1 months and signed.", "Cross-dock slot booking sheet issued within the last 1 months and signed.", "Transfer manifest signed.", "Inbound unloading record issued within the last 1 months and signed.", "Transfer completion confirmation issued within the last 1 months and signed.", "Seal number log issued within the last 1 months and signed.", "If the transfer is an international movement, also: transit customs document, signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer LP-90487", "reference": "KA-79216", "details": ["The transfer is not an international movement.", "The transfer includes a temperature-controlled load."]}, "documents received": ["Seal number log for cross-dock transfer LP-90487, dated 17 May 2026, 1 page. Signed by the sealing operative.", "Transfer manifest for cross-dock transfer LP-90487, dated 24 February 2026, 3 pages, complete. Signed by the transport planner.", "Cross-dock chiller unit check sheet for cross-dock transfer LP-90487, dated 6 May 2026, 1 page. Signed by the chiller unit technician.", "Transfer completion confirmation for cross-dock transfer LP-90487, dated 6 May 2026, 1 page. Signed by the transfer coordinator.", "Cross-dock slot booking sheet for cross-dock transfer LP-90487, dated 24 May 2026, 1 page. Signed by the slot booking coordinator.", "Inbound unloading record for cross-dock transfer LP-90487, dated 20 May 2026, 1 page. Signed by the inbound unloading supervisor.", "Outbound loading record for cross-dock transfer LP-90487, dated 16 May 2026, 1 page. Signed by the outbound loading supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 888}} {"id": "isc-te-00428-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Jundwyn BV", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "10 March 2026"}, "checklist": ["Benefit claim form, valid (not expired) on the date of the review, signed", "Proof of national insurance number", "If the claimant has a non-dependant adult living in the household, also: non-dependant income details form, signed", "Current tenancy agreement, signed", "Recent bank statements, issued within the last 2 months"], "submission": {"case": {"name": "Alice Ostock", "reference": "MD-67214", "details": ["The claimant has a non-dependant adult living in the household."]}, "documents received": ["bank-statements_ostock.pdf. Recent bank statements about Alice Ostock, issued 20 January 2026. 12 pages, complete.", "claim-form_ostock_v2.pdf. Benefit claim form about Alice Ostock, expiring 10 February 2027. Pages 1 to 11 are included; the total number of pages is not shown anywhere. Signed by the claimant.", "id-proof_ostock.pdf. Proof of identity about Alice Ostock, expiring 5 September 2027. It is a single page.", "ni-proof_ostock.pdf. Proof of national insurance number about Alice Ostock, issued 3 January 2026. It is a single page.", "earnings-proof_ostock.pdf. Proof of earnings about Alice Ostock, issued 28 February 2026. 2 pages, complete.", "non-dependant-income_ostock.pdf. Non-dependant income details form about Alice Ostock, issued 3 February 2026. 2 pages, complete. Signed by the non-dependant.", "tenancy-agreement_ostock.pdf. Current tenancy agreement about Alice Ostock, issued 31 December 2025. 12 pages, complete. Signed by the landlord."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete when measured against the checklist. Go over every checklist line relevant to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, contain all its pages, carry a signature wherever the checklist asks for one, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': all applicable lines are met (extra documents do not matter). 'incomplete': at least one applicable line is unmet. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-45", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00193-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Wilmfield SAS", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "30 March 2026"}, "checklist": ["Photo identification, valid (not expired) on the date of the review", "Lost card declaration, signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "Fraud questionnaire, signed", "Card replacement request form, signed", "Confirmation of contact details, issued within the last 3 months"], "submission": {"case": {"name": "Omar Tadock", "reference": "OH-47944", "details": ["The cardholder is abroad and needs the card sent there."]}, "cover note": "Everything needed is attached and complete. Please review the pack for Omar Tadock, reference OH-47944, at your earliest convenience. Emeka Jessridge", "documents received": ["overseas_address_form_tadock_oh47944.pdf - Temporary overseas address registration form for Omar Tadock. It shows a date of issue of 22 February 2026. 1 page, signed by Omar Tadock.", "contact_details_confirmation_tadock_oh47944.pdf - Confirmation of contact details for Omar Tadock. It shows a date of issue of 11 January 2026. 1 page.", "fraud_questionnaire_tadock_oh47944.pdf - Fraud questionnaire for Omar Tadock. It shows a date of issue of 10 January 2026. 2 pages, complete. It is signed by Omar Tadock.", "photo_id_tadock_oh47944.pdf - Photo identification for Omar Tadock. It shows an expiry date of 4 May 2027. 1 page.", "lost_card_declaration_tadock_oh47944.pdf - Lost card declaration for Omar Tadock. It shows a date of issue of 19 January 2026. 1 page, with the signature line empty and not signed.", "card_replacement_request_tadock_oh47944.pdf - Card replacement request form for Omar Tadock. It shows a date of issue of 19 February 2026. 2 pages, complete. It is signed by Omar Tadock."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 889}} {"id": "isc-te-00302-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Yondmouth plc", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "1 April 2026"}, "checklist": ["Check the pack contains the policy machinery schedule.", "Check the pack contains the machine maintenance log, issued within the last 6 months.", "If a temporary machine was hired to keep production going, also: check the pack contains the temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Check the pack contains the photographs of the failed component.", "Check the pack contains the purchase invoice for the machine.", "Check the pack contains the repair or replacement quotation, issued within the last 3 months."], "submission": {"case": {"name": "failed machine ZE-69152", "reference": "EP-56568", "details": ["No temporary machine was hired to keep production going."]}, "documents received": ["Purchase invoice for the machine for machine ZE-69152. Date of issue: 14 December 2025. Single page.", "Machine maintenance log for machine ZE-69152. Date of issue: 30 March 2026. 5 pages, complete.", "Equipment breakdown claim form for machine ZE-69152. Date of issue: 30 January 2026. 3 pages, complete. Signed by the policyholder's operations director.", "Production downtime log for machine ZE-69152. Date of issue: 6 March 2026. 2 pages, complete. Signed by the production manager.", "Photographs of the failed component for machine ZE-69152. Date of issue: 24 March 2026. 2 pages, complete.", "Policy machinery schedule for machine ZE-69152. Date of issue: 11 March 2026. 3 pages, complete.", "Repair or replacement quotation for machine ZE-69152. Date of issue: 17 December 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 831}} {"id": "isc-te-00358-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Kestlock Ltd", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "4 August 2026"}, "checklist": ["Check that the expense claim form is signed.", "Check that the train ticket receipt is present.", "Check that the currency conversion statement was issued within the last 6 months.", "If the claim includes mileage for use of a private car, also check that the mileage log is signed.", "Check that the boarding pass stub is present.", "Check that the taxi fare receipt was issued within the last 6 months."], "submission": {"case": {"name": "Emre Tibins", "reference": "QF-77856", "details": ["The claim includes no private car mileage."]}, "cover note": "Please review this pack for reference QF-77856. A colleague has already checked it before it was passed to me. David Ustisey", "documents received": ["boarding_pass_stub_QF-77856.pdf — Boarding pass stub about Emre Tibins, dated 7 April 2026. It is a single page.", "train_ticket_receipt_QF-77856.pdf — Train ticket receipt about Emre Tibins, dated 28 July 2026. It is a single page.", "taxi_fare_receipt_QF-77856.pdf — Taxi fare receipt about Emre Tibins, dated 8 July 2026. It is a single page.", "expense_claim_form_QF-77856.pdf — Expense claim form about Emre Tibins, dated 4 June 2026. Pages 1-1 of 2 are included, so only 1 of its 2 pages is present. Signed by the claiming employee.", "currency_conversion_statement_QF-77856.pdf — Currency conversion statement about Emre Tibins, dated 30 June 2026. It is a single page.", "restaurant_receipt_QF-77856.pdf — Restaurant receipt about Emre Tibins, dated 25 June 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 842}} {"id": "isc-te-00177-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vaskness Limited", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "29 July 2026"}, "checklist": ["Flight availability printout, issued within the last 1 months", "Hotel availability printout, issued within the last 1 months, signed", "Passport details form, signed", "Special requests note, signed", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review", "Travel insurance quote, issued within the last 1 months"], "submission": {"case": {"name": "holiday booking BX-25277", "reference": "CW-76801", "details": ["The booking includes a child traveller."]}, "documents received": ["Hotel availability printout for holiday booking BX-25277, dated 17 July 2026. 2 pages, complete. Signed by the reservations manager.", "Special requests note for holiday booking BX-25277, dated 23 April 2026. 1 page. Signed by the lead traveller.", "Travel insurance quote for holiday booking BX-25277, dated 5 May 2026. 2 pages, complete.", "Child passport copy for holiday booking BX-25277, showing an expiry date of 2 December 2028. 1 page.", "Flight availability printout for holiday booking BX-25277, dated 12 July 2026. 2 pages, complete.", "Passport details form for holiday booking BX-25277, dated 9 May 2026. 1 page. Signed by the lead traveller.", "Package holiday brochure page for holiday booking BX-25277, dated 1 June 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Consider every checklist line that applies to this case. A required document counts only when it is the kind of document listed (not a similar one), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it has not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-4", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 795}} {"id": "isc-te-00156-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Baxridge Group", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "15 June 2026"}, "checklist": ["Right to work share code printout, issued within the last 3 months", "Medical examination certificate, issued within the last 6 months and signed", "Criminal record check, issued within the last 3 months", "Signed licence application form", "If the applicant is applying for a hackney carriage licence rather than private hire, also: vehicle specification sheet for the hackney carriage"], "submission": {"case": {"name": "Seren Bixingham", "reference": "GY-35046", "details": ["The applicant is applying for a private hire licence rather than hackney carriage."]}, "documents received": ["GY-35046 Bixingham knowledge test pass certificate. A single-page knowledge test pass certificate about Seren Bixingham, showing its date of issue as 31 March 2026.", "GY-35046 Bixingham licence application form. A licence application form about Seren Bixingham, showing its date of issue as 24 May 2026, 6 pages, complete. It is signed by the applicant, Seren Bixingham.", "GY-35046 Bixingham medical examination certificate. A medical examination certificate about Seren Bixingham, showing its date of issue as 24 March 2026, 2 pages, complete. It is signed by the examining doctor.", "GY-35046 Bixingham criminal record check. A criminal record check about Seren Bixingham, showing its date of issue as 10 June 2026, 6 pages, complete.", "GY-35046 Cormez right to work share code printout. A single-page right to work share code printout about Robert Cormez, showing its date of issue as 29 March 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00085-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Marlham GmbH", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "19 May 2026"}, "checklist": ["Driving licence: valid (not expired) on the date of the review, signed", "Additional driver authorisation form: signed", "Passport: valid (not expired) on the date of the review, signed", "Credit card in the driver's name: valid (not expired) on the date of the review, signed", "Vehicle condition report: signed"], "submission": {"case": {"name": "Eoin Thornden", "reference": "KU-86966"}, "cover note": "All the paperwork is in order, so I would be grateful for quick approval. It would help us get the car handed over without delay.", "documents received": ["credit_card_thornden.pdf. Credit card in the driver's name for Eoin Thornden, expiring 18 November 2026. Single page. Signed by the cardholder.", "vehicle_condition_report_thornden.pdf. Vehicle condition report for Eoin Thornden, issued 6 May 2026. 2 pages, complete. Signed by the inspecting branch staff member.", "passport_thornden.pdf. Passport for Eoin Thornden, expiring 24 August 2028. Single page. Signed by the issuing authority.", "driving_licence_thornden.pdf. Driving licence for Eoin Thornden, expiring 8 August 2027. 2 pages, complete. Signed by the licence holder.", "booking_voucher_thornden.pdf. Booking voucher for Eoin Thornden, issued 10 February 2026. Single page."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack satisfies the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "variant-66", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 752}} {"id": "isc-te-00478-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Aldlund GmbH", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "9 September 2026"}, "checklist": ["Impact assessment on the team, signed", "Line manager opinion note, issued within the last 2 months, signed", "Previous flexible working requests record, issued within the last 24 months", "Flexible working request form, signed"], "submission": {"case": {"name": "Adaeze Tibescu", "reference": "CU-27722"}, "documents received": ["flexible_working_request_form_adaeze_tibescu_unsigned.pdf - Flexible working request form regarding Adaeze Tibescu, dated 30 June 2026. 3 pages, complete. The signature line is empty; the form is not signed.", "previous_flexible_working_requests_record_adaeze_tibescu.pdf - Previous flexible working requests record regarding Adaeze Tibescu, dated 12 October 2024. 1 page.", "line_manager_opinion_note_adaeze_tibescu.pdf - Line manager opinion note regarding Adaeze Tibescu, dated 3 August 2026. 2 pages, complete. Signed by the line manager.", "impact_assessment_team_adaeze_tibescu.pdf - Impact assessment on the team regarding Adaeze Tibescu, dated 23 May 2026. 3 pages, complete. Signed by the line manager.", "trial_period_proposal_adaeze_tibescu.pdf - Trial period proposal regarding Adaeze Tibescu, dated 9 July 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 542}} {"id": "isc-te-00409-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Jundwald Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "28 August 2026"}, "checklist": ["Audit finding sheets, signed", "Audit attendance sheet, signed", "Previous audit follow-up record, issued within the last 24 months, signed", "Audit interview notes, signed", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list, signed"], "submission": {"case": {"name": "internal audit AM-70822", "reference": "KP-15972"}, "documents received": ["Audit finding sheets AM-70822.pdf. Dated 5 July 2026, the sheets record the findings of internal audit AM-70822. 2 pages, complete. Each sheet is signed by the lead auditor.", "Audit attendance sheet AM-70822.pdf. This single page, dated 16 August 2026, lists those present at internal audit AM-70822. It is signed by the lead auditor.", "Management review minutes AM-70822.pdf. Dated 9 June 2026, these minutes relate to internal audit AM-70822. 4 pages, complete. They are signed by the chair of the review.", "Previous audit follow-up record AM-70822.pdf. Dated 16 October 2025, this record covers the follow-up actions from internal audit AM-70822. 2 pages, complete. It is signed by the quality manager.", "Audit interview notes AM-70822.pdf. These notes, dated 26 June 2026, cover the interviews held during internal audit AM-70822. 3 pages, complete. They are signed by the auditor who conducted the interviews."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 792}} {"id": "isc-te-00106-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Faldmark Ltd", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "6 April 2026"}, "checklist": ["Obtain the product catalogue declaration, signed.", "Obtain proof of trading address, issued within the last 3 months.", "If the seller is a sole trader rather than a company, also obtain the sole trader statutory declaration, signed.", "Obtain the authorised representative ID copy, valid (not expired) on the date of the review.", "Obtain the business registration certificate.", "Obtain the tax registration letter.", "If the seller intends to list food or cosmetic products, also obtain the safety compliance certificate, issued within the last 12 months."], "submission": {"case": {"name": "Kestcombe LLP", "reference": "JX-13298", "details": ["The seller is a sole trader rather than a company.", "The seller does not intend to list food or cosmetic products."]}, "documents received": ["tax_registration_letter_NesklundLimited.pdf — Tax registration letter in the name of Nesklund Limited, dated 23 March 2026. 1 page.", "business_registration_certificate_KestcombeLLP.pdf — Business registration certificate for Kestcombe LLP, dated 10 March 2026. 1 page.", "authorised_representative_ID_copy_KestcombeLLP.pdf — Authorised representative ID copy for Kestcombe LLP, showing an expiry date of 8 July 2028. 1 page.", "product_catalogue_declaration_KestcombeLLP.pdf — Product catalogue declaration for Kestcombe LLP, dated 7 January 2026. 4 pages, complete. It is signed by an authorised signatory of Kestcombe LLP.", "proof_of_trading_address_KestcombeLLP.pdf — Proof of trading address for Kestcombe LLP, dated 28 February 2026. 1 page.", "sole_trader_statutory_declaration_KestcombeLLP.pdf — Sole trader statutory declaration for Kestcombe LLP, dated 26 December 2025. 1 page. It is signed by the declarant, the sole trader of Kestcombe LLP.", "returns_policy_statement_KestcombeLLP.pdf — Returns policy statement for Kestcombe LLP, dated 8 March 2026. 2 pages, complete. It is signed by an authorised signatory of Kestcombe LLP."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 904}} {"id": "isc-te-00135-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Corvburg plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "16 September 2026"}, "checklist": ["Certified quality management system certificate, valid (not expired) on the date of the review.", "Supplier audit report, issued within the last 24 months, signed.", "Supplier self-assessment report, issued within the last 12 months, signed.", "Supplier corrective action plan, issued within the last 6 months, signed."], "submission": {"case": {"name": "Larvhall Ltd", "reference": "DV-11392"}, "documents received": ["Supplier self-assessment report for Larvhall Ltd, issued 17 March 2026, 6 pages, complete. Signed by the Larvhall quality manager.", "Supplier quality questionnaire for Larvhall Ltd, issued 31 July 2026, 4 pages, complete. Signed by the Larvhall quality manager.", "Single-page certified quality management system certificate for Larvhall Ltd, showing an expiry date of 20 May 2028.", "Supplier corrective action plan for Larvhall Ltd, issued 26 June 2026, 3 pages, complete. Signed by the Larvhall quality manager.", "Supplier audit report for Larvhall Ltd, issued 14 August 2026, 8 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Consider every checklist line that applies to this case. A required document counts only when it is the kind of document listed (not a similar one), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it has not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-4", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 699}} {"id": "isc-te-00123-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Thalhall GmbH", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "7 July 2026"}, "checklist": ["Drying contractor's certificate of completion, issued within the last 6 months and signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "Flood claim form, signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Buildings insurance policy schedule"], "submission": {"case": {"name": "property TU-69693", "reference": "ED-62889"}, "cover note": "I would be grateful for a quick approval, as all the paperwork is in order.", "documents received": ["Photographs of flood water in the rooms for property TU-69693, dated 17 June 2026. Pages 1-2 of 3.", "Drying contractor's certificate of completion for property TU-69693, dated 20 June 2026. 2 pages, complete. Signed by the drying contractor.", "Buildings insurance policy schedule for property TU-69693, dated 7 June 2026. 5 pages, complete.", "Utility supplier's letter confirming the supply was cut off for property TU-69693, dated 9 August 2025. 1 page.", "Flood claim form for property TU-69693, dated 4 April 2026. 5 pages, complete. Signed by the claimant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 732}} {"id": "isc-te-00405-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lunside Group", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "14 May 2026"}, "checklist": ["Previous audit findings closure file, signed.", "Open corrective action list, issued within the last 1 months, signed.", "Audit agenda, signed.", "Calibration status summary, issued within the last 1 months, signed."], "submission": {"case": {"name": "customer audit visit PB-63424", "reference": "XM-57442"}, "cover note": "I am sorry that this pack was put together in a rush. I apologise for any inconvenience this may cause.", "documents received": ["audit_agenda_PB-63424.pdf - Audit agenda for customer audit visit PB-63424. It shows a date of issue of 9 March 2026 and is signed by the quality management office manager. Single page.", "previous_audit_findings_closure_file_PB-63424.pdf - Previous audit findings closure file for customer audit visit PB-63424. It shows a date of issue of 3 February 2026 and is signed by the quality management office manager. 6 pages, complete.", "open_corrective_action_list_PB-63424.pdf - Open corrective action list for customer audit visit PB-63424. It shows a date of issue of 5 May 2026 and is signed by the quality management office manager. 2 pages, complete.", "calibration_status_summary_PB-63424.pdf - Calibration status summary for customer audit visit PB-63424. It shows a date of issue of 1 May 2026 and is signed by the quality management office manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 774}} {"id": "isc-te-00006-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Lindby Limited", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "26 August 2026"}, "checklist": ["Outstanding advance clearance check, signed.", "Trip itinerary and approval, issued within the last 3 months, signed.", "Employee bank detail confirmation, issued within the last 6 months, signed.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Travel advance request form, signed.", "Costed trip estimate sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "Mert Tadsall", "reference": "BC-86447", "details": ["The requested advance is within the standard advance limit."]}, "documents received": ["BC-86447_payroll_deduction_agreement_Mert_Tadsall.pdf - Payroll deduction agreement for recovery of the advance for Mert Tadsall, dated 7 July 2026. 1 page. Signed by the payroll officer.", "BC-86447_costed_trip_estimate_sheet_Mert_Tadsall.pdf - Costed trip estimate sheet for Mert Tadsall, dated 9 August 2026. 1 page. Signed by the line manager.", "BC-86447_trip_itinerary_and_approval_Mert_Tadsall.pdf - Trip itinerary and approval for Mert Tadsall, dated 6 August 2026. 2 pages, complete. Signed by the line manager.", "BC-86447_bank_statement_colleague.pdf - Bank statement belonging to a colleague, filed in the name of Mert Tadsall, dated 13 March 2026. 1 page. Signed by the colleague, the account holder.", "BC-86447_travel_advance_request_form_Mert_Tadsall.pdf - Travel advance request form for Mert Tadsall, dated 13 August 2026. 1 page. Signed by Mert Tadsall, the employee.", "BC-86447_outstanding_advance_clearance_check_Mert_Tadsall.pdf - Outstanding advance clearance check for Mert Tadsall, dated 3 June 2026. 1 page. Signed by the accounts payable supervisor.", "BC-86447_line_manager_approval_Mert_Tadsall.pdf - Line manager approval for the advance for Mert Tadsall, dated 19 August 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 927}} {"id": "isc-te-00104-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Fervford plc", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "25 March 2026"}, "checklist": ["Lost card declaration, signed", "Account statement showing recent activity, issued within the last 1 months", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "Signature verification record, signed", "Delivery address confirmation, signed", "Fraud questionnaire, signed", "Photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Logan Pimberg", "reference": "ZD-97935", "details": ["The cardholder is at their home address."]}, "cover note": "Please find the pack for reference ZD-97935 attached. I am not sure everything needed is there, so please check and let me know if anything is missing.", "documents received": ["Card replacement request form - Pimberg ZD-97935.pdf - Card replacement request form concerning Logan Pimberg, dated 17 December 2025. 2 pages, complete. Signed by the cardholder.", "Signature verification record - Pimberg ZD-97935.pdf - Signature verification record concerning Logan Pimberg, dated 19 February 2026. Single page. Signed by a card services officer.", "Photo identification - Pimberg ZD-97935.pdf - Photo identification concerning Logan Pimberg, showing an expiry date of 10 December 2027. Single page.", "Delivery address confirmation - Pimberg ZD-97935.pdf - Delivery address confirmation concerning Logan Pimberg, dated 21 December 2025. Single page. Signed by the cardholder.", "Lost card declaration - Pimberg ZD-97935.pdf - Lost card declaration concerning Logan Pimberg, dated 15 January 2026. Single page. Signed by the cardholder.", "Fraud questionnaire - Pimberg ZD-97935.pdf - Fraud questionnaire concerning Logan Pimberg, dated 12 February 2026. 2 pages, complete. Signed by the cardholder.", "Account statement - Pimberg ZD-97935.pdf - Account statement showing recent activity concerning Logan Pimberg, dated 15 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 920}} {"id": "isc-te-00212-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Austbury plc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "13 July 2026"}, "checklist": ["Public liability insurance schedule", "Witness statement from a staff member, signed", "Liability claim form, signed", "CCTV footage stills of the incident, issued within the last 3 months", "Incident report from the day, issued within the last 3 months, signed", "Staff training record for the duty manager, issued within the last 24 months, signed"], "submission": {"case": {"name": "Boltdale plc", "reference": "IQ-71848"}, "cover note": "Please review the pack and let me know if anything further is required, as I am not sure everything needed is there.", "documents received": ["CCTV footage stills of the incident relating to Boltdale plc, dated 25 May 2026. 2 pages, complete.", "Incident report from the day relating to Boltdale plc, dated 23 May 2025. 2 pages, complete, signed by the duty manager.", "Incident report from the day relating to Boltdale plc, dated 20 April 2026. 2 pages, complete, signed by the duty manager.", "Witness statement from a staff member relating to Boltdale plc, dated 3 July 2026. Single page, signed by the staff member.", "Liability claim form relating to Boltdale plc, dated 6 May 2026. 3 pages, complete, signed by the claimant.", "Staff training record for the duty manager relating to Boltdale plc, dated 31 August 2025. 2 pages, complete, signed by the duty manager.", "Public liability insurance schedule relating to Boltdale plc, dated 4 June 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00333-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Iskwald Limited", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "3 April 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed.", "Anti-bribery policy statement, signed.", "Certificate of insurance, valid (not expired) on the date of the review.", "Signed copy of the general terms and conditions, signed."], "submission": {"case": {"name": "Dundfeld Ltd", "reference": "GD-75611"}, "documents received": ["Signed copy of the general terms and conditions for Dundfeld Ltd, dated 10 March 2026. 6 pages, complete. Signed by a company director.", "Bank details confirmation letter for Dundfeld Ltd, dated 14 January 2026. Single page. Signed by a bank officer.", "Certificate of insurance for Dundfeld Ltd, expiring 24 January 2028. 2 pages, complete.", "Supplier declaration of no conflicts of interest for Dundfeld Ltd, dated 11 January 2026. Single page. Signed by a company director.", "Anti-bribery policy statement for Dundfeld Ltd, dated 22 January 2026. Pages 1 to 2 of an unstated total are included. Signed by a company director."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; base your judgement on the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-42", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 682}} {"id": "isc-te-00337-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Marlgate & Co", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "19 August 2026"}, "checklist": ["Confirm the pack contains a passport style photograph issued within the last 6 months.", "Confirm the pack contains a photo driving licence that is valid, not expired, on the date of the review, 19 August 2026.", "If the applicant is applying for a hackney carriage licence rather than private hire, also confirm the pack contains a vehicle specification sheet for the hackney carriage.", "Confirm the pack contains a medical examination certificate issued within the last 6 months and signed.", "Confirm the pack contains a signed driver declaration of convictions.", "If the applicant has lived at an address outside the country in the last five years, also confirm the pack contains a criminal record certificate from overseas issued within the last 3 months."], "submission": {"case": {"name": "Lotte Wadova", "reference": "JI-80519", "details": ["The applicant is applying for a hackney carriage licence rather than private hire.", "The applicant has lived at an address outside the country in the last five years."]}, "documents received": ["Vehicle_specification_sheet_Wadova_JI80519.pdf: A vehicle specification sheet for the hackney carriage relating to Lotte Wadova. It shows a date of issue of 4 June 2026. 2 pages, complete.", "Medical_certificate_Wadova_JI80519.pdf: A medical examination certificate for Lotte Wadova. It shows a date of issue of 28 July 2026. 2 pages, complete. It is signed by the examining doctor.", "Convictions_declaration_Wadova_JI80519.pdf: A driver declaration of convictions for Lotte Wadova. It shows a date of issue of 6 May 2026. It is a single page. It is signed by the driver.", "Driving_licence_Wadova_JI80519.pdf: A photo driving licence for Lotte Wadova. The date on it is smudged and cannot be read. 2 pages, complete.", "Photograph_Wadova_JI80519.pdf: A passport style photograph of Lotte Wadova. It shows a date of issue of 30 June 2026. It is a single page.", "Overseas_criminal_record_certificate_Wadova_JI80519.pdf: A criminal record certificate from overseas for Lotte Wadova. It shows a date of issue of 1 July 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete when every applicable line is met (extra documents do not matter). Return incomplete when at least one applicable line is not met. Return unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-29", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 962}} {"id": "isc-te-00012-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Wendhaven Inc", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "27 July 2026"}, "checklist": ["Photo identification, valid (not expired) on the date of the review: present", "Fraud questionnaire, signed: present", "Signature verification record, signed: present", "Card replacement request form, signed: present", "Delivery address confirmation, signed: present", "Confirmation of contact details, issued within the last 3 months: present"], "submission": {"case": {"name": "Lin Yellmore", "reference": "BW-71574"}, "documents received": ["Photo identification - Lin Yellmore.pdf — Photo identification for Lin Yellmore, single page. It shows an expiry date of 7 August 2026.", "Photo identification - Lin Yellmore.pdf — Photo identification for Lin Yellmore, single page. It shows an expiry date of 12 January 2026.", "Fraud questionnaire - Lin Yellmore.pdf — Fraud questionnaire for Lin Yellmore, dated 6 July 2026. 2 pages, complete. It is signed by the cardholder.", "Account statement - Lin Yellmore.pdf — Account statement showing recent activity for Lin Yellmore, dated 23 July 2026. 3 pages, complete.", "Confirmation of contact details - Lin Yellmore.pdf — Confirmation of contact details for Lin Yellmore, dated 4 July 2026, single page.", "Card replacement request form - Lin Yellmore.pdf — Card replacement request form for Lin Yellmore, dated 23 April 2026. 2 pages, complete. It is signed by the cardholder.", "Signature verification record - Lin Yellmore.pdf — Signature verification record for Lin Yellmore, dated 26 April 2026, single page. It is signed by the bank officer who carried out the verification.", "Delivery address confirmation - Lin Yellmore.pdf — Delivery address confirmation for Lin Yellmore, dated 24 May 2026, single page. It is signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00419-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Quelmere Inc", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "23 June 2026"}, "checklist": ["Passport, valid (not expired) on the date of the review: 23 June 2026.", "Three months of bank statements, issued within the last 3 months.", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months, signed.", "Mortgage application form, issued within the last 3 months, signed.", "Gifted deposit letter, issued within the last 3 months, signed."], "submission": {"case": {"name": "Freya Moskwick", "reference": "QS-74483"}, "documents received": ["bank_statements_moskwick.pdf - Three months of bank statements for Freya Moskwick. They show a date of issue of 14 April 2026. 9 pages, complete.", "proof_of_deposit_savings_moskwick.pdf - Proof of deposit savings for Freya Moskwick. It shows a date of issue of 12 May 2026. 2 pages, complete.", "gifted_deposit_letter_moskwick.pdf - Gifted deposit letter for Freya Moskwick. It shows a date of issue of 17 May 2026. It is a single page. It is signed by the donor of the gift.", "mortgage_application_form_moskwick.pdf - Mortgage application form for Freya Moskwick. It shows a date of issue of 2 April 2026. 10 pages, complete. It is signed by the borrower, Freya Moskwick.", "p60_tax_summary_moskwick.pdf - P60 tax summary for Freya Moskwick. It shows a date of issue of 25 September 2025. 2 pages, complete.", "passport_moskwick.pdf - Passport for Freya Moskwick. It shows an expiry date of 21 August 2027. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 831}} {"id": "isc-te-00475-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Jaskside plc", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "5 March 2026"}, "checklist": ["If the employee has caring responsibilities for a dependent, also: caring responsibilities statement (signed).", "Trial period proposal (signed).", "Current working pattern statement (issued within the last 3 months).", "If the request is to work entirely from home, also: home working equipment checklist (signed).", "Line manager opinion note (issued within the last 2 months, signed).", "Impact assessment on the team (signed).", "Proposed working pattern plan (signed).", "Client or service impact statement (signed)."], "submission": {"case": {"name": "Beatriz Zellopoulos", "reference": "FK-25780", "details": ["The employee does not have caring responsibilities for a dependent.", "The request is not to work entirely from home."]}, "documents received": ["Trial period proposal for Beatriz Zellopoulos. Dated 10 December 2025. Single page, signed by Beatriz Zellopoulos.", "Client or service impact statement for Beatriz Zellopoulos. Dated 15 December 2025. Single page, signed by the line manager.", "Proposed working pattern plan for Beatriz Zellopoulos. Dated 12 November 2025. 2 pages, complete, signed by Beatriz Zellopoulos.", "Line manager opinion note on Beatriz Zellopoulos. Dated 2 February 2026. 2 pages, complete, signed by the line manager.", "Previous flexible working requests record for Beatriz Zellopoulos. Dated 17 April 2025. Single page.", "Impact assessment on the team regarding Beatriz Zellopoulos. Dated 7 February 2026. 3 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00294-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Ulmfield Inc", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "23 April 2026"}, "checklist": ["Check the location details sheet is present.", "Check the cost estimate is present, was issued within the last 3 months, and is signed.", "Check the job request form is present and is signed.", "Check the parts order confirmation is present and was issued within the last 1 months.", "If the job involves working at height above two metres, also check the permit to work at height is present, was issued within the last 1 months, and is signed.", "Check the access authorisation slip is present and is signed."], "submission": {"case": {"name": "maintenance request PZ-34030", "reference": "IX-99751", "details": ["The job involves no work at height above two metres."]}, "cover note": "Please have a look through the pack and let me know if anything else is needed, as I am not certain everything required is in there. Thanks, Carmen", "documents received": ["Photographs of the fault for maintenance request PZ-34030, dated 4 March 2026. It has 2 pages, complete.", "A single-page location details sheet for maintenance request PZ-34030, dated 17 April 2026.", "A risk assessment for the task under maintenance request PZ-34030, dated 10 February 2026. It has 5 pages, complete. It is signed by the assessing supervisor.", "A single-page access authorisation slip for maintenance request PZ-34030, dated 12 January 2026. It is signed by the site security manager.", "A single-page job request form for maintenance request PZ-34030, dated 2 January 2026. It is signed by the requesting department manager.", "A single-page parts order confirmation for maintenance request PZ-34030, dated 10 April 2026.", "A cost estimate for maintenance request PZ-34030, dated 14 April 2026. It has 2 pages, complete. It is signed by the estimating manager."]}}, "question": {"type": "choice", "instructions": "Does the pack measure up to the checklist? Examine every checklist line that applies here. A required document only counts if it is the kind of document listed (not a similar one), relates to the subject of the case, contains all its pages, carries a signature wherever the checklist asks for one, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Use complete if every applicable line is met (extra documents do not matter). Use incomplete if at least one applicable line is not met. Use unclear if no line is clearly unmet but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-23", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 881}} {"id": "isc-te-00453-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Tondbrook BV", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "20 July 2026"}, "checklist": ["Signed leaver notification form.", "Signed shared mailbox handover record, issued within the last 1 months.", "Signed final payroll cut-off note, issued within the last 1 months.", "If the leaver held privileged administrator accounts, also: signed privileged account revocation certificate, issued within the last 1 months.", "If the leaver is moving to a competitor, also: signed confidential data removal attestation, issued within the last 1 months.", "Signed non-disclosure reminder acknowledgement."], "submission": {"case": {"name": "Samuel Ingins", "reference": "QD-28899", "details": ["The leaver held no privileged administrator accounts.", "The leaver is moving to a competitor."]}, "documents received": ["final-payroll-cut-off-note-ingins.pdf - Final payroll cut-off note for Samuel Ingins, dated 13 July 2026. Single page. Signed by the payroll officer.", "line-manager-confirmation-ingins.pdf - Line manager confirmation for Samuel Ingins, dated 18 July 2026. Single page. Signed by the line manager.", "leaver-notification-form-ingins.pdf - Leaver notification form for Samuel Ingins, dated 24 May 2026. 2 pages, complete. Signed by the line manager.", "confidential-data-removal-attestation-ingins.pdf - Confidential data removal attestation for Samuel Ingins, dated 4 July 2026. Single page. Signed by the information security officer.", "shared-mailbox-handover-record-ingins-copy.pdf - Shared mailbox handover record for Samuel Ingins, dated 18 July 2026. Pages 1-1 of 2. Signed by the IT service desk manager.", "non-disclosure-reminder-acknowledgement-ingins.pdf - Non-disclosure reminder acknowledgement for Samuel Ingins, dated 12 July 2026. Single page. Signed by Samuel Ingins."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 840}} {"id": "isc-te-00045-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Teskmouth BV", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "24 June 2026"}, "checklist": ["If the supplier subcontracts part of the production, also: subcontractor approval record (issued within the last 12 months, signed)", "Raw material certificate of analysis (issued within the last 6 months, signed)", "Financial stability statement (issued within the last 12 months, signed)", "Supplier self-assessment report (issued within the last 12 months, signed)", "Certified quality management system certificate (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Orrwood Ltd", "reference": "EW-86026", "details": ["The supplier carries out all production in-house."]}, "documents received": ["Raw material certificate of analysis for Orrwood Ltd, dated 9 February 2026. 2 pages, complete. Signed by the supplier's quality manager.", "Supplier self-assessment report for Orrwood Ltd, dated 7 September 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Supplier quality questionnaire for Orrwood Ltd, dated 7 May 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Financial stability statement for Orrwood Ltd, dated 18 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Certified quality management system certificate for Orrwood Ltd, with an expiry date of 7 September 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 730}} {"id": "isc-te-00295-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Gormlock BV", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "29 May 2026"}, "checklist": ["Completed annual leave request form, signed", "If the leave requested is longer than 2 weeks, also: extended absence cover plan, signed", "Return to work date confirmation", "Statutory holiday entitlement confirmation", "Manager approval email, issued within the last 2 months", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave, signed", "Team holiday planner extract"], "submission": {"case": {"name": "Alice Gillsall", "reference": "SV-90688", "details": ["The leave requested is longer than two weeks.", "The employee is requesting leave during a known busy period."]}, "cover note": "Please find attached everything needed for reference SV-90688, all complete. I would be grateful if you could review it at your convenience.", "documents received": ["Scanned completed annual leave request form for Alice Gillsall, dated 20 April 2026. Single page, signed by the employee.", "Scanned business case for peak-period leave for Alice Gillsall, dated 25 February 2026. 2 pages, complete, signed by the line manager.", "Scanned extended absence cover plan for Alice Gillsall, dated 21 May 2026. 3 pages, complete, signed by the line manager.", "Scanned manager approval email for Alice Gillsall, dated 20 May 2026. Single page.", "Scanned team holiday planner extract for Alice Gillsall, dated 13 February 2026. 2 pages, complete.", "Scanned statutory holiday entitlement confirmation for Alice Gillsall, dated 28 February 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00428-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Jundwyn BV", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "10 March 2026"}, "checklist": ["Benefit claim form, valid (not expired) on the date of the review, signed", "Proof of national insurance number", "If the claimant has a non-dependant adult living in the household, also: non-dependant income details form, signed", "Current tenancy agreement, signed", "Recent bank statements, issued within the last 2 months"], "submission": {"case": {"name": "Alice Ostock", "reference": "MD-67214", "details": ["The claimant has a non-dependant adult living in the household."]}, "documents received": ["bank-statements_ostock.pdf. Recent bank statements about Alice Ostock, issued 20 January 2026. 12 pages, complete.", "id-proof_ostock.pdf. Proof of identity about Alice Ostock, expiring 5 September 2027. It is a single page.", "non-dependant-income_ostock.pdf. Non-dependant income details form about Alice Ostock, issued 3 February 2026. 2 pages, complete. Signed by the non-dependant.", "ni-proof_ostock.pdf. Proof of national insurance number about Alice Ostock, issued 3 January 2026. It is a single page.", "tenancy-agreement_ostock.pdf. Current tenancy agreement about Alice Ostock, issued 31 December 2025. 12 pages, complete. Signed by the landlord.", "claim-form_ostock.pdf. Benefit claim form about Alice Ostock, expiring 10 February 2027. Pages 1 to 10 are included; the total number of pages is not shown anywhere. Signed by the claimant."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack matches the checklist. Take each checklist line that applies to this case in turn. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete: every applicable line is met (extra documents do not matter). Choose incomplete: at least one applicable line is not met. Choose unclear: no line is clearly unmet, but at least one cannot be decide from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-20", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 785}} {"id": "isc-te-00240-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jarlvik Group", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "8 September 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Travel request form (signed)", "Trip cost estimate (signed)", "Passport copy for international travel (valid (not expired) on the date of the review)", "Hotel booking confirmation", "Line manager approval (signed)", "Visa entry requirement printout (issued within the last 3 months)"], "submission": {"case": {"name": "business trip TW-11432", "reference": "GJ-59230", "details": ["The traveller is not a passport holder of the destination country."]}, "documents received": ["Visa entry requirement printout. It concerns business trip TW-11432. Date of issue: 10 July 2026. 2 pages, complete.", "Flight itinerary quote. It concerns business trip TW-11432. Date of issue: 26 August 2026. 2 pages, complete.", "Hotel booking confirmation. It concerns business trip TW-11432. Date of issue: 11 August 2026. 2 pages, complete.", "Travel request form. It concerns business trip TW-11432. Date of issue: 16 August 2026. 2 pages, complete. Signed by the traveller.", "Trip cost estimate. It concerns business trip TW-11432. Date of issue: 5 August 2026. Single page. Signed by the traveller.", "Work permit confirmation. It concerns business trip TW-11432. Date of issue: 9 June 2026. 2 pages, complete.", "Line manager approval. It concerns business trip TW-11432. Date of issue: 18 June 2026. Single page. Signed by the line manager.", "Passport copy for international travel. It concerns business trip TW-11432. Expiry date: 21 January 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 859}} {"id": "isc-te-00234-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Nordridge & Co", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "13 April 2026"}, "checklist": ["Confirm the pack includes an account purpose statement.", "Confirm the pack includes a two-factor authentication confirmation issued within the last 3 months.", "Confirm the pack includes an admin access list issued within the last 3 months.", "Confirm the pack includes a naming convention approval that is signed.", "If the account will post content about financial products, also confirm the pack includes a financial promotions approval note issued within the last 3 months and signed.", "Confirm the pack includes an account request form that is signed."], "submission": {"case": {"name": "new social media account WY-2923", "reference": "PH-42275", "details": ["The account will post content about financial products."]}, "cover note": "Everything needed is attached and complete for your review.", "documents received": ["Scanned account request form about new social media account WY-2923, showing its date of issue as 13 March 2026, and signed by the requesting marketing manager. The scan is a single page.", "Scanned admin access list about new social media account WY-2923, showing its date of issue as 21 February 2026. The scan is a single page.", "Scanned naming convention approval about new social media account WY-2923, showing its date of issue as 5 April 2026, and signed by the social media governance team lead. The scan is a single page.", "Scanned two-factor authentication confirmation about new social media account WY-2923, showing its date of issue as 22 March 2026. The scan is a single page.", "Scanned account purpose statement about new social media account WY-2923, showing its date of issue as 29 December 2025. The scan is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 816}} {"id": "isc-te-00447-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Delvheim SAS", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "10 August 2026"}, "checklist": ["Conference fee invoice, issued within the last 12 months", "Expense claim form, signed", "Currency conversion statement, issued within the last 6 months", "Taxi fare receipt, issued within the last 6 months", "Boarding pass stub", "Train ticket receipt"], "submission": {"case": {"name": "Thiago Sabock", "reference": "ML-97341"}, "documents received": ["Single-page currency conversion statement relating to Thiago Sabock, dated 13 May 2026.", "Single-page train ticket receipt relating to Thiago Sabock, dated 28 April 2026.", "Single-page conference fee invoice relating to Thiago Sabock, dated 28 May 2026.", "Single-page boarding pass stub relating to Thiago Sabock, dated 3 July 2026.", "Single-page taxi fare receipt relating to Thiago Sabock. The date of issue is smudged and cannot be read.", "Expense claim form relating to Thiago Sabock, dated 31 May 2026. 2 pages, complete. Signed by the claiming employee, Thiago Sabock.", "Hotel invoice relating to Thiago Sabock, dated 30 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 694}} {"id": "isc-te-00413-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Quorhaven BV", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "31 July 2026"}, "checklist": ["Confirm the pack contains a store installation guide.", "Confirm the pack contains a flammability test certificate issued within the last 12 months.", "Confirm the pack contains a brand colour specification.", "Confirm the pack contains a shipping manifest issued within the last 1 months.", "Confirm the pack contains a kit contents list.", "Confirm the pack contains a kit cost breakdown issued within the last 3 months and signed."], "submission": {"case": {"name": "merchandising kit BG-68516", "reference": "EJ-95989"}, "documents received": ["Kit contents list for merchandising kit BG-68516, dated 19 April 2026. 2 pages, complete.", "Store installation guide for merchandising kit BG-68516, dated 29 May 2026. 6 pages, complete.", "Flammability test certificate for merchandising kit BG-68516, dated 17 July 2026. Single page.", "Waste disposal plan for merchandising kit BG-68516, dated 11 June 2026. Single page.", "Shipping manifest for merchandising kit BG-68516, dated 12 July 2026. 2 pages, complete.", "Kit cost breakdown for merchandising kit BG-68516, dated 17 July 2026. 2 pages, complete. Signed by the finance manager.", "Brand colour specification for merchandising kit BG-68516, dated 7 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 782}} {"id": "isc-te-00481-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Caelholm SAS", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "18 May 2026"}, "checklist": ["Check that the pack contains the policy machinery schedule.", "Check that the pack contains the purchase invoice for the machine.", "Check that the pack contains a signed equipment breakdown claim form.", "Check that the pack contains the machine maintenance log, issued within the last 6 months.", "Check that the pack contains the engineer's fault diagnosis report, issued within the last 3 months and signed.", "If a temporary machine was hired to keep production going, also check that the pack contains the temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Check that the pack contains the repair or replacement quotation, issued within the last 3 months."], "submission": {"case": {"name": "failed machine NT-58567", "reference": "LG-78763", "details": ["No temporary machine was hired to keep production going."]}, "documents received": ["cleaning_rota_for_the_workshop_NT-58567.pdf. Cleaning rota for the workshop dated 30 November 2025. 5 pages, complete.", "repair_or_replacement_quotation_NT-58567.pdf. Repair or replacement quotation dated 3 March 2026. 2 pages, complete.", "engineers_fault_diagnosis_report_NT-58567.pdf. Engineer's fault diagnosis report dated 1 May 2026, signed by the diagnosing engineer. 4 pages, complete.", "purchase_invoice_NT-58567.pdf. Purchase invoice for the machine dated 26 January 2026. Single page.", "equipment_breakdown_claim_form_NT-58567.pdf. Equipment breakdown claim form dated 8 May 2026, signed by the policyholder. 3 pages, complete.", "policy_machinery_schedule_NT-58567.pdf. Policy machinery schedule dated 15 April 2026. 3 pages, complete.", "production_downtime_log_NT-58567.pdf. Production downtime log dated 25 March 2026, signed by the production supervisor. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 871}} {"id": "isc-te-00408-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Jarlfeld Inc", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "17 April 2026"}, "checklist": ["Signed audit checklist for each area visited", "Signed audit finding sheets", "Signed audit interview notes", "Signed audit attendance sheet", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list (signed)", "Signed previous audit follow-up record issued within the last 24 months"], "submission": {"case": {"name": "internal audit OC-33937", "reference": "ST-29209", "details": ["The audit did not cover the calibration laboratory."]}, "documents received": ["OC-33937_previous_audit_follow_up_record.pdf. Previous audit follow-up record for internal audit OC-33937, dated 29 March 2026. 2 pages, complete. Signed by the quality manager.", "OC-33937_audit_summary_report.pdf. Audit summary report for internal audit OC-33937, dated 11 March 2026. 5 pages, complete. Signed by the lead auditor.", "OC-33937_audit_finding_sheets.pdf. Audit finding sheets for internal audit OC-33937, dated 26 March 2026. 2 pages, complete. The signature line is empty; the document is not signed.", "OC-33937_audit_interview_notes.pdf. Audit interview notes for internal audit OC-33937, dated 10 April 2026. 3 pages, complete. Signed by the lead auditor.", "OC-33937_audit_checklist.pdf. Audit checklist for each area visited for internal audit OC-33937, dated 1 March 2026. 4 pages, complete. Signed by the lead auditor.", "OC-33937_audit_attendance_sheet.pdf. Audit attendance sheet for internal audit OC-33937, dated 16 January 2026. Single page. Signed by the site management review board chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 849}} {"id": "isc-te-00296-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Corvwald GmbH", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "2 April 2026"}, "checklist": ["Statutory holiday entitlement confirmation is enclosed.", "Signed handover note is enclosed.", "Team holiday planner extract is enclosed.", "Manager approval email is enclosed, issued within the last 2 months.", "Leave balance statement is enclosed, issued within the last 3 months."], "submission": {"case": {"name": "Kayla Ostcombe", "reference": "KW-71803"}, "documents received": ["Statutory holiday entitlement confirmation for Kayla Ostcombe, dated 16 January 2026. 1 page.", "Contact plan for time away for Kayla Ostcombe, dated 3 December 2025. 1 page.", "Job description with no handover information for Kayla Ostcombe, dated 9 February 2026. 2 pages, complete. Signed by the HR manager.", "Team holiday planner extract for Kayla Ostcombe, dated 11 December 2025. 2 pages, complete.", "Manager approval email for Kayla Ostcombe, dated 16 February 2026. 1 page.", "Leave balance statement for Kayla Ostcombe, dated 20 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 670}} {"id": "isc-te-00369-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Iskmark GmbH", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "7 September 2026"}, "checklist": ["Confirm the pack contains a travel policy extract showing advance eligibility.", "Confirm the pack contains a payroll deduction agreement for recovery of the advance, signed.", "Confirm the pack contains an outstanding advance clearance check, signed.", "Confirm the pack contains a costed trip estimate sheet, signed and issued within the last 3 months.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Confirm the pack contains a travel advance request form, signed."], "submission": {"case": {"name": "Matteo Mundham", "reference": "VW-11525", "details": ["The requested advance is above the standard advance limit."]}, "cover note": "I am sorry that this pack was put together in a rush. Please let me know if anything needs a second look.", "documents received": ["Line manager approval for the advance. Issued 13 June 2026, 1 page. Signed by the line manager, approving the advance for Matteo Mundham.", "Travel advance request form. Issued 2 August 2026, 1 page. Signed by Matteo Mundham, requesting the travel advance.", "Finance director approval for the higher advance. Issued 12 May 2026, 1 page. Signed by the finance director, approving the higher advance for Matteo Mundham.", "Payroll deduction agreement for recovery of the advance. Issued 25 August 2026, 1 page. Signed by Matteo Mundham, agreeing that the advance will be recovered from pay.", "Outstanding advance clearance check. Issued 19 August 2026, 1 page. Signed by the payroll administrator, confirming the check on outstanding advances for Matteo Mundham.", "Costed trip estimate sheet. Issued 4 August 2026, 1 page. Signed by Matteo Mundham, listing the estimated costs for the trip.", "Travel policy extract showing advance eligibility. Issued 30 June 2026, 1 page. The extract shows that Matteo Mundham is eligible for a travel advance."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 866}} {"id": "isc-te-00040-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Delvham BV", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "12 May 2026"}, "checklist": ["Seal number log, issued within the last 1 months and signed", "Load consolidation sheet, issued within the last 3 months and signed", "Cross-dock slot booking sheet, issued within the last 1 months and signed", "Outbound loading record, issued within the last 1 months and signed"], "submission": {"case": {"name": "cross-dock transfer QC-37927", "reference": "WU-40761"}, "documents received": ["Seal number log for cross-dock transfer QC-37927, dated 2 May 2026. Single page, signed by the dispatch supervisor.", "Transfer manifest for cross-dock transfer QC-37927, dated 23 April 2026. 3 pages, complete, signed by the transfer coordinator.", "Outbound loading record for cross-dock transfer QC-37927, dated 29 April 2026. Single page, signed by the outbound loading supervisor.", "Load consolidation sheet for cross-dock transfer QC-37927, dated 9 March 2026. 2 pages, complete, signed by the load planner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 674}} {"id": "isc-te-00216-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Boltlund SAS", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "7 September 2026"}, "checklist": ["Asbestos survey report, issued within the last 12 months.", "Energy performance certificate, valid (not expired) on the date of the review.", "Signed stamp duty return.", "Guarantor consent letter, signed."], "submission": {"case": {"name": "premises KD-67988", "reference": "ID-68027"}, "documents received": ["Letter_of_Support_KD-67988_24Aug2026.pdf. Letter of support for premises KD-67988, dated 24 August 2026. 1 page. Signed by the parent company's authorised signatory. It contains no guarantee wording.", "Stamp_Duty_Return_KD-67988_29Jul2026.pdf. Stamp duty return for premises KD-67988, dated 29 July 2026. 2 pages, complete. Signed by the tenant's finance director.", "Company_Search_Report_KD-67988_03Sep2026.pdf. Company search report for premises KD-67988, dated 3 September 2026. 2 pages, complete.", "EPC_KD-67988.pdf. Energy performance certificate for premises KD-67988, expiring 23 April 2027. 1 page.", "Asbestos_Survey_Report_KD-67988_22Aug2026.pdf. Asbestos survey report for premises KD-67988, dated 22 August 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 775}} {"id": "isc-te-00402-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Wilmdale Limited", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "14 July 2026"}, "checklist": ["Trade account application form, signed.", "Bank reference letter, issued within the last 6 months, signed.", "Company registration certificate.", "If the customer is a newly incorporated company, also: director identification record, signed.", "Credit reference agency report, issued within the last 3 months.", "Credit limit approval memo, issued within the last 1 months, signed."], "submission": {"case": {"name": "Larvridge Partners", "reference": "JU-12708", "details": ["The customer is not a newly incorporated company."]}, "documents received": ["Company registration certificate for Larvridge Partners, dated 27 June 2026. 2 pages, complete.", "Credit limit approval memo for Larvridge Partners, dated 3 July 2026. Single page. Signed by the credit control manager.", "Trade account application form for Larvridge Partners, dated 5 April 2026. 3 pages, complete. Signed by the customer's authorised signatory.", "Credit reference agency report for Larvridge Partners, dated 4 May 2026. 6 pages, complete.", "Bank reference letter for Larvridge Partners, dated 9 May 2026. Single page. Signed by a bank officer.", "Signed credit terms agreement for Larvridge Partners, dated 23 April 2026. 4 pages, complete. Signed by the customer's authorised signatory."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete: every applicable line is met (extra documents do not matter). Reply incomplete: at least one applicable line is not met. Reply unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-15", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 739}} {"id": "isc-te-00111-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Orrham & Co", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "12 June 2026"}, "checklist": ["Risk assessment for the task: issued within the last 3 months and signed.", "Job request form: signed.", "Access authorisation slip: signed.", "Planned completion date sheet: signed.", "Cost estimate: issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request HG-58912", "reference": "AR-31853"}, "documents received": ["Visitor pass 9 April 2026.pdf — Visitor pass from a previous visit connected to maintenance request HG-58912, dated 9 April 2026. Single page. Signed by the visitor who used it.", "Cost estimate HG-58912.pdf — Cost estimate for maintenance request HG-58912, dated 2 April 2026. 2 pages, complete. Signed by the estimating supervisor.", "Planned completion date sheet HG-58912.pdf — Planned completion date sheet for maintenance request HG-58912, dated 9 April 2026. Single page. Signed by the facilities coordinator.", "Job request form HG-58912.pdf — Job request form for maintenance request HG-58912, dated 28 April 2026. Single page. Signed by the requesting manager.", "Risk assessment HG-58912.pdf — Risk assessment for the task under maintenance request HG-58912, dated 12 May 2026. 5 pages, complete. Signed by the health and safety officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 758}} {"id": "isc-te-00197-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Yarvwood Group", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "2 September 2026"}, "checklist": ["Authorised representative ID copy, valid (not expired) on the date of the review.", "Anti-money laundering questionnaire, signed.", "Tax registration letter.", "Business registration certificate.", "Product catalogue declaration, signed.", "Returns policy statement, signed."], "submission": {"case": {"name": "Quorgate GmbH", "reference": "HF-92686"}, "cover note": "Please find attached the onboarding pack for reference HF-92686. Everything needed is attached and complete. If you need anything further, let me know.", "documents received": ["Bank account verification letter for Quorgate GmbH. It shows a date of issue of 27 June 2026. 1 page. It is signed by a bank officer.", "Authorised representative ID copy for Quorgate GmbH. The expiry date is covered by a stamp and cannot be read. 1 page.", "Business registration certificate for Quorgate GmbH. It shows a date of issue of 2 July 2026. 1 page.", "Returns policy statement for Quorgate GmbH. It shows a date of issue of 27 August 2026. 2 pages, complete. It is signed by the authorised representative.", "Product catalogue declaration for Quorgate GmbH. It shows a date of issue of 20 August 2026. 4 pages, complete. It is signed by the authorised representative.", "Tax registration letter for Quorgate GmbH. It shows a date of issue of 2 August 2026. 1 page.", "Anti-money laundering questionnaire for Quorgate GmbH. It shows a date of issue of 6 June 2026. 3 pages, complete. It is signed by the authorised representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 791}} {"id": "isc-te-00050-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Wilmmouth Ltd", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "19 June 2026"}, "checklist": ["Account purpose statement is included.", "Signed platform terms acceptance record is included.", "Signed account request form is included.", "Two-factor authentication confirmation is included, issued within the last 3 months.", "If the account will post content about financial products, also: financial promotions approval note, issued within the last 3 months and signed."], "submission": {"case": {"name": "new social media account JE-72058", "reference": "TC-88544", "details": ["The account will not post any content about financial products."]}, "documents received": ["Account purpose statement for new social media account JE-72058. Dated 17 March 2026. Single page.", "Admin access list for new social media account JE-72058. Dated 19 May 2026. Single page.", "Content escalation route for new social media account JE-72058. Dated 17 May 2026 and signed by the social media governance lead. Single page.", "Account request form for new social media account JE-72058. Dated 25 March 2026 and signed by the account requester. Single page.", "Platform terms acceptance record for new social media account JE-72058. Dated 17 April 2026 and signed by the social media manager. Single page.", "Two-factor authentication confirmation for new social media account JE-72058. Dated 10 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 756}} {"id": "isc-te-00389-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Mersstow Partners", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "3 July 2026"}, "checklist": ["Trial period proposal, signed.", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed.", "Impact assessment on the team, signed.", "Flexible working request form, signed.", "Proposed working pattern plan, signed.", "Client or service impact statement, signed."], "submission": {"case": {"name": "Elif Arnstad", "reference": "VD-24090", "details": ["The employee has caring responsibilities for a dependent."]}, "documents received": ["Proposed working pattern plan - Elif Arnstad - 17 May 2026.pdf. Proposed working pattern plan concerning Elif Arnstad, dated 17 May 2026. It is 2 pages, complete, and is signed by the line manager.", "Trial period proposal - Elif Arnstad - 19 March 2026.pdf. Trial period proposal concerning Elif Arnstad, dated 19 March 2026. It is 1 page and is signed by the line manager.", "Impact assessment on the team - Elif Arnstad - 1 May 2026.pdf. Impact assessment on the team concerning Elif Arnstad, dated 1 May 2026. It is 3 pages, complete, and is signed by the line manager.", "Flexible working request form - Elif Arnstad - 24 March 2026.pdf. Flexible working request form concerning Elif Arnstad, dated 24 March 2026. It is 3 pages, complete, and is signed by the employee.", "Current working pattern statement - Elif Arnstad - 4 June 2026.pdf. Current working pattern statement concerning Elif Arnstad, dated 4 June 2026. It is 1 page.", "Client or service impact statement - Elif Arnstad - 14 June 2026.pdf. Client or service impact statement concerning Elif Arnstad, dated 14 June 2026. It is 1 page and is signed by the service lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 859}} {"id": "isc-te-00180-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Weskfield SAS", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "24 July 2026"}, "checklist": ["Confirm the pack includes the rollback plan, signed.", "Confirm the pack includes the firewall change request form, signed.", "Confirm the pack includes the current rule set export, issued within the last 1 months.", "Confirm the pack includes the peer review checklist, issued within the last 1 months, signed."], "submission": {"case": {"name": "firewall change GH-61214", "reference": "TJ-47386"}, "documents received": ["peer_review_checklist_GH-61214.pdf — Peer review checklist for firewall change GH-61214, dated 13 July 2026. Single page. Signed by the peer reviewer.", "proposed_rule_change_spec_GH-61214.pdf — Proposed rule change specification for firewall change GH-61214, dated 3 June 2026. 2 pages, complete. Signed by the network engineer who prepared the specification.", "file_006.pdf — The file will not open, so its contents cannot be seen.", "rollback_plan_GH-61214.pdf — Rollback plan for firewall change GH-61214, dated 22 May 2026. 2 pages, complete. Signed by the network security team lead.", "firewall_change_request_GH-61214.pdf — Firewall change request form for firewall change GH-61214, dated 13 July 2026. 3 pages, complete. Signed by the requesting change manager.", "current_rule_set_export_GH-61214.pdf — Current rule set export for firewall change GH-61214, dated 11 July 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 799}} {"id": "isc-te-00287-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Fervburg SAS", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "27 April 2026"}, "checklist": ["Confirm the pack contains the chargeback response form, signed.", "If the goods were delivered to an address different from the billing address, also include the address verification check report, issued within the last 3 months.", "Confirm the pack contains the terms of sale acceptance log, issued within the last 12 months.", "Confirm the pack contains the customer order history extract, issued within the last 6 months.", "Confirm the pack contains the transaction record printout, issued within the last 3 months."], "submission": {"case": {"name": "disputed transaction TL-11034", "reference": "MA-40092", "details": ["The goods were delivered to the billing address."]}, "documents received": ["Terms of sale acceptance log for disputed transaction TL-11034, dated 5 May 2025. Single page.", "Fraud screening result sheet for disputed transaction TL-11034, dated 17 April 2026. Single page.", "Transaction record printout for disputed transaction TL-11034, dated 25 April 2026. Single page.", "Chargeback response form for disputed transaction TL-11034, dated 4 April 2026. 2 pages, complete. The form is signed by the payments disputes team lead.", "Customer order history extract for disputed transaction TL-11034, dated 26 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 737}} {"id": "isc-te-00466-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silberg & Co", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "19 June 2026"}, "checklist": ["Venue access instructions, issued within the last 3 months", "Cancellation policy acceptance, signed", "Payment confirmation, issued within the last 3 months", "Prerequisite certificate", "Delegate photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "course booking EZ-28200", "reference": "MC-76518"}, "documents received": ["Cancellation policy acceptance for course booking EZ-28200. Date of issue: 19 May 2026. Signed by the delegate. Single page.", "Payment confirmation for course booking EZ-28200. Date of issue: 14 June 2026. Single page.", "Delegate photo identification for course booking EZ-28200. Expiry date: 31 January 2028. Single page.", "Venue access instructions for course booking EZ-28200. Date of issue: 30 March 2026. Single page.", "Passport-style photo with no official markings for course booking EZ-28200. Expiry date: 31 January 2028. Single page.", "Prerequisite certificate for course booking EZ-28200. Date of issue: 10 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 722}} {"id": "isc-te-00493-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Delvlund GmbH", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "6 August 2026"}, "checklist": ["Check that the signed credit terms agreement is included and signed.", "Check that the personal guarantee is included and signed.", "Check that the company registration certificate is included.", "Check that the bank reference letter is included, was issued within the last 6 months, and is signed.", "Check that the trade references letter is included, was issued within the last 3 months, and is signed.", "Check that the credit reference agency report is included and was issued within the last 3 months."], "submission": {"case": {"name": "Haskhurst Limited", "reference": "ZB-88049"}, "cover note": "I am sorry that this pack was put together in a rush. I would ask you to bear that in mind as you review it.", "documents received": ["Bank reference letter - Haskhurst Limited.pdf. Dated 3 August 2026, this bank reference letter concerns Haskhurst Limited and is signed by a bank officer. 1 page.", "Signed credit terms agreement - Haskhurst Limited.pdf. Dated 7 June 2026, this signed credit terms agreement concerns Haskhurst Limited and is signed by the company's managing director. 4 pages, complete.", "Credit limit approval memo - Haskhurst Limited.pdf. Dated 18 July 2026, this credit limit approval memo concerns Haskhurst Limited and is signed by the credit control manager. 1 page.", "Personal guarantee - Haskhurst Limited.pdf. Dated 27 May 2026, this personal guarantee concerns Haskhurst Limited and is signed by the guarantor. 2 pages, complete.", "Trade references letter - Haskhurst Limited.pdf. Dated 22 July 2026, this trade references letter concerns Haskhurst Limited and is signed by the trade referee. 1 page.", "Credit reference agency report - Haskhurst Limited.pdf. Dated 18 July 2026, this credit reference agency report concerns Haskhurst Limited. 6 pages, complete.", "Company registration certificate - Haskhurst Limited.pdf. Dated 20 April 2026, this company registration certificate concerns Haskhurst Limited. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 888}} {"id": "isc-te-00202-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Hondstow BV", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "7 July 2026"}, "checklist": ["New floor snagging list, issued within the last 1 month and signed", "Lifting equipment inspection report, issued within the last 6 months and signed", "Furniture inventory list, issued within the last 1 month and signed", "Crate hire agreement, signed"], "submission": {"case": {"name": "office move project NU-22840", "reference": "HJ-76078"}, "documents received": ["New floor snagging list for office move project NU-22840, dated 25 June 2026. 3 pages, complete. Signed by the site manager.", "Lifting equipment inspection report for office move project NU-22840, dated 21 May 2026. 2 pages, complete. Signed by the inspection engineer.", "Furniture inventory list for office move project NU-22840; the date of issue is obscured by a stamp. 4 pages, complete. Signed by the facilities coordinator.", "Crate hire agreement for office move project NU-22840, dated 15 May 2026. 2 pages, complete. Signed by the crate hire supplier's representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "date not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 679}} {"id": "isc-te-00217-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Wendwater BV", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "6 May 2026"}, "checklist": ["Losses calculation statement, issued within the last 1 month and signed", "Litigation hold notice, issued within the last 1 month and signed", "Original service agreement copy", "Termination notice draft, signed", "Breach evidence log, issued within the last 1 month and signed", "Cure period expiry calculation, issued within the last 1 month and signed"], "submission": {"case": {"name": "Yselmoor Partners", "reference": "PS-88626"}, "documents received": ["litigation_hold_notice_yselmoor.pdf - Litigation hold notice concerning Yselmoor Partners, dated 16 April 2026. 2 pages, complete. Signed by the General Counsel.", "cure_period_expiry_calculation_undated.pdf - Cure period expiry calculation concerning Yselmoor Partners. The date of issue is smudged and cannot be read. 2 pages, complete. Signed by the Contract Administrator.", "losses_calculation_statement_yselmoor.pdf - Losses calculation statement concerning Yselmoor Partners, dated 23 April 2026. 3 pages, complete. Signed by the Chief Financial Officer.", "termination_clause_legal_opinion_yselmoor.pdf - Termination clause legal opinion concerning Yselmoor Partners, dated 24 April 2026. 5 pages, complete. Signed by external counsel.", "breach_evidence_log_yselmoor.pdf - Breach evidence log concerning Yselmoor Partners, dated 29 April 2026. 6 pages, complete. Signed by the Head of Contract Management.", "original_service_agreement_copy_yselmoor.pdf - Original service agreement copy concerning Yselmoor Partners, dated 18 January 2026. 10 pages, complete.", "termination_notice_draft_yselmoor.pdf - Termination notice draft concerning Yselmoor Partners, dated 30 January 2026. 2 pages, complete. Signed by the Commercial Contracts Manager."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 851}} {"id": "isc-te-00384-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Jundburg Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "8 June 2026"}, "checklist": ["Confirm the pack contains the plant room access sign-in sheet.", "Confirm the pack contains the thermostat calibration certificate, issued within the last 12 months.", "Confirm the pack contains the engineer F-gas handling certificate, valid (not expired) on the date of the review.", "Confirm the pack contains the F-gas leak check record, issued within the last 12 months and signed.", "Confirm the pack contains the refrigerant top-up log, issued within the last 1 months and signed.", "Confirm the pack contains the system pressure test results, issued within the last 1 months and signed.", "If refrigerant was added during the service, also confirm the pack contains the refrigerant recovery note, issued within the last 1 months and signed."], "submission": {"case": {"name": "air conditioning system QA-33718", "reference": "FF-66011", "details": ["Refrigerant was added during the service."]}, "cover note": "Please find the pack enclosed. My colleague has already checked it over. Let me know if you need anything else from me.", "documents received": ["Asset condition photograph sheet for air conditioning system QA-33718, dated 18 May 2026. 2 pages, complete.", "Engineer F-gas handling certificate for air conditioning system QA-33718, showing an expiry date of 1 November 2028. 1 page.", "Plant room access sign-in sheet for air conditioning system QA-33718, dated 4 April 2026. 1 page.", "Refrigerant top-up log for air conditioning system QA-33718, dated 31 May 2026. 1 page. Signed by the servicing engineer.", "Thermostat calibration certificate for air conditioning system QA-33718, dated 10 January 2026. 1 page.", "F-gas leak check record for air conditioning system QA-33718, dated 5 October 2025. 2 pages, complete. Signed by the servicing engineer.", "System pressure test results for air conditioning system QA-33718, dated 26 May 2026. 2 pages, complete. Signed by the servicing engineer."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 729}} {"id": "isc-te-00061-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pelllund Partners", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "24 July 2026"}, "checklist": ["Quality inspection report, issued within the last 6 months and signed", "Supplier performance scorecard, signed", "Corrective action plan, issued within the last 6 months and signed", "If the supplier is being considered for an expanded scope, also: expanded scope assessment memo, signed", "If the supplier missed the agreed service levels, also: service credit request form, signed", "Service level summary, issued within the last 12 months", "Contract compliance checklist, signed", "Delivery record summary, issued within the last 12 months"], "submission": {"case": {"name": "Pravheim Limited", "reference": "ZV-43025", "details": ["The supplier is being considered for an expanded scope.", "The supplier met all agreed service levels."]}, "documents received": ["Corrective action plan about Pravheim Limited, dated 21 April 2026. 2 pages, complete. Signed by the supplier quality lead.", "Expanded scope assessment memo about Pravheim Limited, dated 6 May 2026. 2 pages, complete. Signed by the procurement manager.", "Delivery record summary about Pravheim Limited, dated 12 October 2025. 2 pages, complete.", "Quality inspection report about Pravheim Limited, dated 25 February 2026. 3 pages, complete. Signed by the quality inspector.", "Contract compliance checklist about Pravheim Limited, dated 8 July 2026. 3 pages, complete. Signed by the contract manager.", "Supplier performance scorecard about Pravheim Limited, dated 13 June 2026. 2 pages, complete. Signed by the supplier relationship manager.", "Invoice discrepancy log about Pravheim Limited, dated 12 June 2026. 2 pages, complete.", "General factory tour handout about Pravheim Limited, dated 25 February 2026. 3 pages, complete. Signed by the site tour coordinator.", "Service level summary about Pravheim Limited, dated 10 February 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 859}} {"id": "isc-te-00459-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Mersstead Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "14 August 2026"}, "checklist": ["Sales invoice or receipt for the sale proceeds, issued within the last 3 months", "Asset disposal request form, signed", "If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer, issued within the last 3 months", "Fixed asset register extract for the asset", "Depreciation schedule for the asset to date"], "submission": {"case": {"name": "disposed asset LV-4099", "reference": "IW-81554"}, "documents received": ["Sales invoice or receipt for the sale proceeds for disposed asset LV-4099. Date of issue: 10 August 2026. 1 page.", "Fixed asset register extract for the asset for disposed asset LV-4099. Date of issue: 3 June 2026. 1 page.", "Asset disposal request form for disposed asset LV-4099. Date of issue: 27 May 2026. 2 pages, complete. Signed by the budget holder.", "Depreciation schedule for the asset to date for disposed asset LV-4099. Date of issue: 16 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "variant-72", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 689}} {"id": "isc-te-00012-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Wendhaven Inc", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "27 July 2026"}, "checklist": ["Photo identification, valid (not expired) on the date of the review: present", "Fraud questionnaire, signed: present", "Signature verification record, signed: present", "Card replacement request form, signed: present", "Delivery address confirmation, signed: present", "Confirmation of contact details, issued within the last 3 months: present"], "submission": {"case": {"name": "Lin Yellmore", "reference": "BW-71574"}, "documents received": ["Delivery address confirmation - Lin Yellmore.pdf — Delivery address confirmation for Lin Yellmore, dated 24 May 2026, single page. It is signed by the cardholder.", "Fraud questionnaire - Lin Yellmore.pdf — Fraud questionnaire for Lin Yellmore, dated 6 July 2026. 2 pages, complete. It is signed by the cardholder.", "Signature verification record - Lin Yellmore.pdf — Signature verification record for Lin Yellmore, dated 26 April 2026, single page. It is signed by the bank officer who carried out the verification.", "Photo identification - Lin Yellmore.pdf — Photo identification for Lin Yellmore, single page. It shows an expiry date of 12 September 2025.", "Card replacement request form - Lin Yellmore.pdf — Card replacement request form for Lin Yellmore, dated 23 April 2026. 2 pages, complete. It is signed by the cardholder.", "Photo identification - Lin Yellmore.pdf — Photo identification for Lin Yellmore, single page. It shows an expiry date of 1 August 2026.", "Confirmation of contact details - Lin Yellmore.pdf — Confirmation of contact details for Lin Yellmore, dated 4 July 2026, single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00000-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Jorbury Partners", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "17 April 2026"}, "checklist": ["Obtain the signed non-disclosure reminder acknowledgement.", "Obtain the final payroll cut-off note, issued within the last 1 months and signed.", "If the leaver held privileged administrator accounts, also obtain the privileged account revocation certificate, issued within the last 1 months and signed.", "Obtain the service desk ticket closure summary, issued within the last 1 months.", "Obtain the line manager confirmation, issued within the last 1 months and signed."], "submission": {"case": {"name": "Matthias Grubisey", "reference": "TW-20429", "details": ["The leaver held privileged administrator accounts."]}, "cover note": "Hi, I'm sending over the leaver pack for TW-20429. A colleague has already checked it through, so it should be ready for your review.", "documents received": ["leaver_notification_form_grubisey_9apr2026.pdf — A leaver notification form for Matthias Grubisey, dated 9 April 2026. 2 pages, complete. It is signed by the line manager.", "service_desk_ticket_closure_summary_grubisey_11apr2026.pdf — A service desk ticket closure summary for Matthias Grubisey, dated 11 April 2026. 3 pages, complete.", "final_payroll_cutoff_note_grubisey_2apr2026.pdf — A single-page final payroll cut-off note for Matthias Grubisey, dated 2 April 2026. It is signed by the payroll officer.", "privileged_account_revocation_cert_grubisey_13apr2026.pdf — A single-page privileged account revocation certificate for Matthias Grubisey, dated 13 April 2026. It is signed by the identity and access management team lead.", "ndc_reminder_ack_grubisey_28dec2025.pdf — A single-page non-disclosure reminder acknowledgement for Matthias Grubisey, dated 28 December 2025. It is signed by Matthias Grubisey."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 879}} {"id": "isc-te-00165-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Teskwater Limited", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "3 July 2026"}, "checklist": ["Gateway integration request form, signed", "Test environment transaction log, issued within the last 1 months", "If the gateway will handle recurring subscription payments, also: subscription billing mandate template, signed", "Go-live sign-off certificate, issued within the last 1 months, signed", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review", "Payment gateway technical specification", "Penetration test summary, issued within the last 6 months, signed"], "submission": {"case": {"name": "payment gateway EG-51001", "reference": "MP-69353", "details": ["The gateway will handle recurring subscription payments.", "The gateway will not store customers' card details."]}, "documents received": ["Fraud screening configuration sheet for payment gateway EG-51001, dated 16 April 2026. 1 page. It is signed by the IT Security Lead.", "Subscription billing mandate template for payment gateway EG-51001, dated 4 April 2026. 2 pages, complete. It is signed by the Treasury Manager.", "Test environment transaction log for payment gateway EG-51001, dated 30 June 2026. 4 pages, complete.", "Payment gateway technical specification for payment gateway EG-51001, dated 5 May 2026. 8 pages, complete.", "Gateway integration request form for payment gateway EG-51001, dated 3 April 2026. 2 pages, complete. It is signed by the Head of Payments and IT Security.", "Go-live sign-off certificate for payment gateway EG-51001, dated 14 June 2026. 1 page. It is signed by the Payments Operations Director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 821}} {"id": "isc-te-00171-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Fennthorpe plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "3 September 2026"}, "checklist": ["Root cause analysis report, issued within the last 3 months and signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months and signed.", "Follow-up owner assignment sheet, issued within the last 3 months and signed.", "If the incident involved a data leak to an outside party, also: data breach notification record, issued within the last 3 months and signed.", "Customer impact statement, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Remediation items list, issued within the last 3 months and signed."], "submission": {"case": {"name": "production incident NA-65901", "reference": "RU-67954", "details": ["The incident was caused entirely by internal systems.", "The incident involved a data leak to an outside party."]}, "documents received": ["NA-65901_postmortem_meeting_minutes.pdf - Postmortem meeting minutes for production incident NA-65901, dated 7 August 2026. 3 pages, complete. Signed by the chair of the postmortem meeting.", "NA-65901_customer_impact_statement.pdf - Customer impact statement for production incident NA-65901, dated 8 August 2026. 2 pages, complete.", "NA-65901_data_breach_notification_record.pdf - Data breach notification record for production incident NA-65901, dated 6 August 2026. 2 pages, complete. Signed by the data protection officer.", "NA-65901_follow_up_owner_assignment_sheet.pdf - Follow-up owner assignment sheet for production incident NA-65901, dated 31 August 2026. Single page. Signed by the incident manager.", "NA-65901_root_cause_analysis_report.pdf - Root cause analysis report for production incident NA-65901, dated 4 August 2026. 5 pages, complete. Signed by the lead reliability engineer.", "NA-65901_press_release.pdf - Press release about a new product launch, dated 8 August 2026, connected to production incident NA-65901. 2 pages, complete.", "NA-65901_remediation_items_list.pdf - Remediation items list for production incident NA-65901, dated 6 July 2026. 2 pages, complete. Signed by the engineering manager.", "NA-65901_service_level_objective_breach_record.pdf - Service level objective breach record for production incident NA-65901, dated 20 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1029}} {"id": "isc-te-00463-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Jorwick & Co", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "5 August 2026"}, "checklist": ["Obtain a shareholder register extract issued within the last 3 months.", "Obtain a signed board resolution to open the account.", "Obtain a signed beneficial owner identification form.", "Obtain a proof of registered office address issued within the last 3 months."], "submission": {"case": {"name": "Kaldvik Inc", "reference": "KZ-84732"}, "documents received": ["beneficial_owner_identification_form_Kaldvik_Inc.pdf. Beneficial owner identification form for Kaldvik Inc, dated 31 July 2026. 3 pages, complete, signed by a director.", "proof_of_registered_office_address_Kaldvik_Inc.pdf. Proof of registered office address for Kaldvik Inc, dated 1 August 2026. Single page.", "shareholder_register_extract_Kaldvik_Inc.pdf. Shareholder register extract for Kaldvik Inc, dated 21 July 2026. 2 pages, complete.", "board_resolution_Kaldvik_Inc.pdf. Board resolution to open the account for Kaldvik Inc, dated 13 April 2026. Single page, signed by the chair of the board."]}}, "question": {"type": "choice", "instructions": "Is the pack complete relative to the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-35", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 672}} {"id": "isc-te-00183-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Pentmere BV", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "23 June 2026"}, "checklist": ["Final backup confirmation, issued within the last 3 months, signed.", "Licence reassignment note, issued within the last 3 months, signed.", "Data migration confirmation, issued within the last 3 months, signed.", "Network disconnection confirmation, issued within the last 1 months, signed.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server CA-57344", "reference": "IG-40941", "details": ["The server holds archived records that must be kept."]}, "documents received": ["Final backup confirmation for retired server CA-57344, dated 15 April 2026, single page, signed by the backup administrator.", "Licence reassignment note for retired server CA-57344, dated 23 May 2026, single page, signed by the licence manager.", "Network disconnection confirmation for retired server CA-57344, dated 16 June 2026, single page, signed by the network operations engineer.", "Data migration confirmation for retired server CA-57344, dated 16 May 2026, 2 pages, complete, signed by the data migration lead.", "Archive retention confirmation for retired server CA-57344, dated 17 April 2026, 2 pages, complete, signed by the records manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 749}} {"id": "isc-te-00292-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Elvcombe Group", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "17 June 2026"}, "checklist": ["Furniture inventory list, issued within the last 1 months and signed", "Movers insurance certificate, valid (not expired) on the date of the review", "If the move includes taking furniture to a storage unit, also: storage unit access authorisation, signed", "Signed move plan", "New floor snagging list, issued within the last 1 months and signed", "Parking bay suspension approval, issued within the last 1 months and signed", "Lifting equipment inspection report, issued within the last 6 months and signed"], "submission": {"case": {"name": "office move project BE-20815", "reference": "GI-40044", "details": ["The move includes taking furniture to a storage unit."]}, "cover note": "Could you approve this pack as soon as you can? Everything is in order, so it should be a quick one to sign off.", "documents received": ["move-plan-BE-20815.pdf - Signed move plan for office move project BE-20815, dated 10 April 2026. 6 pages, complete. Signed by the move project manager.", "movers-insurance-BE-20815.pdf - Movers insurance certificate for office move project BE-20815. Shows an expiry date of 24 September 2027. Single page.", "lifting-inspection-BE-20815.pdf - Lifting equipment inspection report for office move project BE-20815, dated 21 March 2026. 2 pages, complete. Signed by the lifting equipment inspector.", "it-decommissioning-BE-20815.pdf - IT decommissioning certificate for office move project BE-20815, dated 29 May 2026. Single page. Signed by the IT support lead.", "furniture-inventory-BE-20815.pdf - Furniture inventory list for office move project BE-20815, dated 28 May 2026. 4 pages, complete. Signed by the facilities manager.", "storage-access-BE-20815.pdf - Storage unit access authorisation for office move project BE-20815, dated 5 June 2026. Single page. Signed by the storage unit site manager.", "parking-suspension-BE-20815.pdf - Parking bay suspension approval for office move project BE-20815, dated 9 June 2026. Single page. Signed by the local highways authority officer.", "crate-hire-BE-20815.pdf - Crate hire agreement for office move project BE-20815, dated 6 April 2026. 2 pages, complete. Signed by the crate hire supplier representative.", "snagging-list-BE-20815-30-03-26.pdf - New floor snagging list for office move project BE-20815, dated 30 March 2026. 3 pages, complete. Signed by the new floor site manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1099}} {"id": "isc-te-00301-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Marlcliff Limited", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "3 March 2026"}, "checklist": ["Liability claim form, signed.", "Incident report from the day, issued within the last 3 months, signed.", "Photographs of the spillage on the floor, issued within the last 1 months.", "CCTV footage stills of the incident, issued within the last 3 months.", "Public liability insurance schedule.", "Cleaning log for the day of the incident, issued within the last 6 months, signed."], "submission": {"case": {"name": "Jundton Ltd", "reference": "EC-53915"}, "documents received": ["Photographs of the spillage on the floor relating to Jundton Ltd, dated 25 February 2026. Single page.", "Cleaning log for the day of the incident relating to Jundton Ltd, dated 2 October 2025. Single page. Signed by the cleaner.", "The shop's opening hours notice relating to Jundton Ltd, dated 1 February 2026. 2 pages, complete. Signed by the store manager.", "Staff training record for the duty manager relating to Jundton Ltd, dated 16 November 2024. 2 pages, complete. Signed by the duty manager.", "Witness statement from a staff member relating to Jundton Ltd, dated 31 January 2026. Single page. Signed by the staff member.", "Liability claim form relating to Jundton Ltd, dated 30 January 2026. 3 pages, complete. Signed by the claimant.", "CCTV footage stills of the incident relating to Jundton Ltd, dated 24 February 2026. 2 pages, complete.", "Public liability insurance schedule relating to Jundton Ltd, dated 22 February 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 814}} {"id": "isc-te-00119-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Prydcourt Ltd", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "13 August 2026"}, "checklist": ["Confirm the trial period proposal is included and signed.", "If the employee has caring responsibilities for a dependent, also check for a caring responsibilities statement and confirm it is signed.", "Confirm the client or service impact statement is included and signed.", "Confirm the impact assessment on the team is included and signed.", "Confirm the line manager opinion note is signed and was issued within the last 2 months.", "Confirm the current working pattern statement is issued within the last 3 months.", "Confirm the proposed working pattern plan is included and signed."], "submission": {"case": {"name": "Thiago Lamingham", "reference": "TJ-66574", "details": ["The employee has caring responsibilities for a dependent."]}, "cover note": "Please find attached everything needed for this pack, and it is all complete. Let me know if you have any questions.", "documents received": ["line manager opinion note – Thiago Lamingham, issued 5 July 2026. 2 pages, complete, signed by the line manager.", "proposed working pattern plan – Thiago Lamingham, issued 4 July 2026. 2 pages, complete, signed by the line manager.", "client or service impact statement – Thiago Lamingham, issued 27 June 2026. A single page, signed by the line manager.", "impact assessment on the team – Thiago Lamingham, issued 9 May 2026. 3 pages, complete, signed by the line manager.", "current working pattern statement – Thiago Lamingham, issued 17 June 2026. A single page.", "trial period proposal – Thiago Lamingham, issued 1 July 2026. A single page, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 792}} {"id": "isc-te-00405-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lunside Group", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "14 May 2026"}, "checklist": ["Previous audit findings closure file, signed.", "Open corrective action list, issued within the last 1 months, signed.", "Audit agenda, signed.", "Calibration status summary, issued within the last 1 months, signed."], "submission": {"case": {"name": "customer audit visit PB-63424", "reference": "XM-57442"}, "documents received": ["calibration_status_summary_PB-63424.pdf - Calibration status summary for customer audit visit PB-63424. It shows a date of issue of 1 May 2026 and is signed by the quality management office manager. 2 pages, complete.", "audit_agenda_PB-63424.pdf - Audit agenda for customer audit visit PB-63424. It shows a date of issue of 9 March 2026 and is signed by the quality management office manager. Single page.", "previous_audit_findings_closure_file_PB-63424.pdf - Previous audit findings closure file for customer audit visit PB-63424. It shows a date of issue of 3 February 2026 and is signed by the quality management office manager. 6 pages, complete.", "document_control_list_PB-63424.pdf - Document control list for customer audit visit PB-63424. It shows a date of issue of 9 March 2026 and is signed by the quality management office manager. 4 pages, complete.", "open_corrective_action_list_PB-63424.pdf - Open corrective action list for customer audit visit PB-63424. It shows a date of issue of 5 May 2026 and is signed by the quality management office manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00192-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Glenthorpe Inc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "3 April 2026"}, "checklist": ["Shareholder register extract issued within the last 3 months.", "Beneficial owner identification form, signed.", "Certificate of incorporation.", "Company tax registration certificate.", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents.", "Board resolution to open the account, signed.", "Company statutes, signed."], "submission": {"case": {"name": "Austshaw LLP", "reference": "DH-79163", "details": ["All beneficial owners of the company are residents."]}, "documents received": ["Board resolution to open the account - Austshaw LLP.pdf\nA board resolution to open the account for Austshaw LLP, dated 2 February 2026. Single page. It is signed by a director.", "Certificate of incorporation - Austshaw LLP.pdf\nA certificate of incorporation for Austshaw LLP, dated 6 January 2026. Single page.", "Proof of registered office address - Austshaw LLP.pdf\nA proof of registered office address for Austshaw LLP, dated 31 March 2026. Single page.", "Authorised signer identity document - Austshaw LLP.pdf\nAn authorised signer identity document for Austshaw LLP showing an expiry date of 29 January 2028. Single page.", "Company tax registration certificate - Austshaw LLP.pdf\nA company tax registration certificate for Austshaw LLP, dated 31 December 2025. Single page.", "Beneficial owner identification form - Austshaw LLP.pdf\nA beneficial owner identification form for Austshaw LLP, dated 25 March 2026. 3 pages, complete. It is signed by a beneficial owner.", "Company statutes - Austshaw LLP.pdf\nCompany statutes for Austshaw LLP, dated 19 February 2026. 12 pages, complete. It is signed by a director.", "Shareholder register extract - Austshaw LLP.pdf\nA shareholder register extract for Austshaw LLP. The date of issue is smudged and cannot be read. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 846}} {"id": "isc-te-00308-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Mersvik Inc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "10 March 2026"}, "checklist": ["Confirm the pack includes the guarantor consent letter, signed", "Confirm the pack includes the energy performance certificate, valid (not expired) on the date of the review", "Confirm the pack includes the stamp duty return, signed", "Confirm the pack includes the signed draft lease, signed"], "submission": {"case": {"name": "premises KB-78902", "reference": "VA-57606"}, "cover note": "Please review the attached pack for premises KB-78902, reference VA-57606. I am not sure everything needed is there, so please let me know if anything is missing. Jonas Cormins", "documents received": ["Energy Performance Certificate for premises KB-78902, reference VA-57606, showing an expiry date of 26 June 2026. It is 1 page.", "Stamp Duty Return for premises KB-78902, reference VA-57606, dated 16 January 2026. It is 2 pages, complete, and is signed by the tenant.", "Signed Draft Lease for premises KB-78902, reference VA-57606, dated 17 December 2025. It is 12 pages, complete, and is signed by both the landlord and the tenant.", "Guarantor Consent Letter, dated 23 December 2025, for premises KB-78902, reference VA-57606. It is 1 page and carries the guarantor's signature."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00407-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Morvwood plc", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "9 June 2026"}, "checklist": ["If the customer auditor requests access to sub-tier supplier records, also include: sub-tier supplier records summary (issued within the last 3 months, signed)", "layout tour plan (signed)", "previous audit findings closure file (signed)", "training matrix extract (issued within the last 3 months, signed)", "calibration status summary (issued within the last 1 months, signed)", "open corrective action list (issued within the last 1 months, signed)", "audit agenda (signed)"], "submission": {"case": {"name": "customer audit visit YO-54795", "reference": "YP-28673", "details": ["The customer auditor does not request access to sub-tier supplier records."]}, "documents received": ["Audit agenda for customer audit visit YO-54795, issued 21 February 2026. Single page, signed by the quality manager.", "Open corrective action list for customer audit visit YO-54795, issued 24 May 2026. 2 pages, complete, signed by the quality manager.", "Training matrix extract for customer audit visit YO-54795. The date of issue is smudged and cannot be read. 3 pages, complete, signed by the training coordinator.", "Document control list for customer audit visit YO-54795, issued 6 May 2026. 4 pages, complete, signed by the document controller.", "Calibration status summary for customer audit visit YO-54795, issued 31 May 2026. 2 pages, complete, signed by the calibration lead.", "Layout tour plan for customer audit visit YO-54795, issued 26 May 2026. Single page, signed by the quality manager.", "Previous audit findings closure file for customer audit visit YO-54795, issued 12 April 2026. 6 pages, complete, signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 848}} {"id": "isc-te-00393-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Heskbrook Inc", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "3 April 2026"}, "checklist": ["If the property is a listed building, also: listed building consent for the repairs (signed)", "If the flood water reached the upper floor of the property, also: upper floor damage schedule (signed)", "debris removal invoice (issued within the last 6 months)", "buildings insurance policy schedule", "utility supplier's letter confirming the supply was cut off (issued within the last 12 months)", "council flood warning notice (issued within the last 12 months)", "flood claim form (signed)", "drying contractor's certificate of completion (issued within the last 6 months, signed)"], "submission": {"case": {"name": "property RN-72349", "reference": "ME-41465", "details": ["The property is a listed building.", "The flood water reached the upper floor of the property."]}, "documents received": ["Council flood warning notice. Dated 5 June 2025 and relating to property RN-72349. 1 page.", "Buildings insurance policy schedule. Dated 3 March 2026 and relating to property RN-72349. 5 pages, complete.", "Loss adjuster's inspection report. Dated 12 February 2026 and relating to property RN-72349. 6 pages, complete. Signed by the loss adjuster.", "Drying contractor's certificate of completion. Dated 9 January 2026 and relating to property RN-72349. 2 pages, complete. Signed by the drying contractor.", "Listed building consent for the repairs. Dated 25 February 2026 and relating to property RN-72349. 2 pages, complete. Signed by the listed building consent officer.", "Upper floor damage schedule. Dated 21 December 2025 and relating to property RN-72349. 3 pages, complete. Signed by the loss adjuster.", "Debris removal invoice. Dated 17 November 2025 and relating to property RN-72349. 1 page.", "Utility supplier's letter confirming the supply was cut off. Dated 2 May 2025 and relating to property RN-72349. 1 page.", "Flood claim form. Dated 30 January 2026 and relating to property RN-72349. Pages 1-4 of 5. Signed by the policyholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "pages missing", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 962}} {"id": "isc-te-00445-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vaskburg Partners", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "27 August 2026"}, "checklist": ["If the claim exceeds the limit that requires director sign-off, also: director approval slip (issued within the last 3 months, signed)", "taxi fare receipt (issued within the last 6 months)", "restaurant receipt (issued within the last 6 months)", "train ticket receipt", "conference fee invoice (issued within the last 12 months)", "hotel invoice (issued within the last 6 months)"], "submission": {"case": {"name": "Claire Daskard", "reference": "YL-14076", "details": ["The claim exceeds the limit that requires director sign-off."]}, "documents received": ["Director approval slip. It concerns Claire Daskard and shows its date of issue as 1 July 2026. It is 1 page and carries the signature of the finance director.", "Boarding pass stub. It concerns Claire Daskard and shows its date of issue as 11 August 2026. It is 1 page.", "Taxi fare receipt. It concerns Claire Daskard and shows its date of issue as 25 July 2026. It is 1 page.", "Hotel invoice. It concerns Claire Daskard and shows its date of issue as 31 March 2026. It is 2 pages, complete.", "Restaurant receipt. It concerns Claire Daskard and shows its date of issue as 19 July 2026. It is 1 page.", "Conference fee invoice. It concerns Claire Daskard and shows its date of issue as 4 March 2026. It is 1 page.", "Train ticket receipt. It concerns Claire Daskard and shows its date of issue as 7 July 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack matches the checklist. Take each checklist line that applies to this case in turn. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete: every applicable line is met (extra documents do not matter). Choose incomplete: at least one applicable line is not met. Choose unclear: no line is clearly unmet, but at least one cannot be decide from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-20", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00117-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Istcombe plc", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "27 May 2026"}, "checklist": ["Include a previous grievance outcome letter issued within the last 24 months.", "Include a grievance procedure acknowledgement issued within the last 3 months and signed.", "If the grievance alleges bullying by a named colleague, also include a bullying allegation evidence log, signed.", "Include an evidence bundle index, signed.", "Include a written grievance statement, signed.", "Include a meeting invitation with rights explained issued within the last 1 months.", "Include an adjustment request record issued within the last 3 months and signed."], "submission": {"case": {"name": "Piotr Aldthwaite", "reference": "RG-62178", "details": ["The grievance alleges bullying by a named colleague."]}, "documents received": ["PA-RG-62178-03 bullying allegation evidence log.pdf — A bullying allegation evidence log concerning Piotr Aldthwaite, dated 2 May 2026. 3 pages, complete, and signed by the investigating officer.", "PA-RG-62178-07 adjustment request record.pdf — An adjustment request record concerning Piotr Aldthwaite, dated 19 March 2026. It is a single page and is signed by the line manager.", "PA-RG-62178-12 previous grievance outcome letter.pdf — A previous grievance outcome letter concerning Piotr Aldthwaite whose date of issue is covered by an ink stamp and cannot be read. 2 pages, complete.", "PA-RG-62178-13 witness list.pdf — A witness list concerning Piotr Aldthwaite, dated 30 April 2026. It is a single page and is signed by the HR case handler.", "PA-RG-62178-05 written grievance statement.pdf — A written grievance statement concerning Piotr Aldthwaite, dated 2 April 2026. 3 pages, complete, and signed by the employee.", "PA-RG-62178-06 meeting invitation with rights explained.pdf — A meeting invitation with rights explained concerning Piotr Aldthwaite, dated 9 May 2026. It is a single page.", "PA-RG-62178-04 evidence bundle index.pdf — An evidence bundle index concerning Piotr Aldthwaite, dated 5 February 2026. 2 pages, complete, and signed by the case coordinator.", "PA-RG-62178-02 grievance procedure acknowledgement.pdf — A grievance procedure acknowledgement concerning Piotr Aldthwaite, dated 4 April 2026. It is a single page and is signed by the HR case handler."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Go through all checklist lines that apply to this case. To count, a required document must be the kind of document listed rather than a similar one, must be about the subject of the case, must have all its pages, must be signed wherever the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-62", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1012}} {"id": "isc-te-00119-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Prydcourt Ltd", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "13 August 2026"}, "checklist": ["Confirm the trial period proposal is included and signed.", "If the employee has caring responsibilities for a dependent, also check for a caring responsibilities statement and confirm it is signed.", "Confirm the client or service impact statement is included and signed.", "Confirm the impact assessment on the team is included and signed.", "Confirm the line manager opinion note is signed and was issued within the last 2 months.", "Confirm the current working pattern statement is issued within the last 3 months.", "Confirm the proposed working pattern plan is included and signed."], "submission": {"case": {"name": "Thiago Lamingham", "reference": "TJ-66574", "details": ["The employee does not have caring responsibilities for a dependent."]}, "documents received": ["previous flexible working requests record – Thiago Lamingham, issued 19 October 2024. A single page.", "line manager opinion note – Thiago Lamingham, issued 5 July 2026. 2 pages, complete, signed by the line manager.", "current working pattern statement – Thiago Lamingham, issued 17 June 2026. A single page.", "impact assessment on the team – Thiago Lamingham, issued 9 May 2026. 3 pages, complete, signed by the line manager.", "client or service impact statement – Thiago Lamingham, issued 27 June 2026. A single page, signed by the line manager.", "trial period proposal – Thiago Lamingham, issued 1 July 2026. A single page, signed by the line manager.", "proposed working pattern plan – Thiago Lamingham, issued 4 July 2026. 2 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 792}} {"id": "isc-te-00198-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Dunddale Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "8 September 2026"}, "checklist": ["Venue access instructions, issued within the last 3 months", "Payment confirmation, issued within the last 3 months", "Cancellation policy acceptance, signed", "Employer sponsorship letter, issued within the last 3 months, signed", "Delegate photo identification, valid (not expired) on the date of the review", "Course booking form, signed"], "submission": {"case": {"name": "course booking BH-46231", "reference": "KS-57829"}, "documents received": ["Employer sponsorship letter for course booking BH-46231. Date of issue: 4 September 2026. 1 page. Signed by the employer.", "Delegate photo identification for course booking BH-46231. Expiry date: 12 June 2028. 1 page.", "Course booking form for course booking BH-46231. Date of issue: 30 June 2026. 2 pages, complete. Signed by the delegate.", "Payment confirmation for course booking BH-46231. Date of issue: 13 August 2026. 1 page.", "Venue access instructions for course booking BH-46231. Date of issue: 27 July 2026. 1 page.", "Cancellation policy acceptance for course booking BH-46231. Date of issue: 11 August 2026. 1 page. Signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 738}} {"id": "isc-te-00249-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Wilmwood Inc", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "13 May 2026"}, "checklist": ["If the adult owns property that could be considered in the financial assessment, also: property valuation report (issued within the last 12 months, signed)", "needs assessment report (signed)", "recent bank statements (issued within the last 3 months)", "support plan (signed)", "proof of identity (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Rhys Lamnall", "reference": "CN-53168", "details": ["The adult does not own property that could be considered in the financial assessment."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["support plan.pdf — A support plan about Rhys Lamnall, dated 25 February 2026. It has 6 pages, complete. It is signed by a social worker.", "proof of identity.pdf — A proof of identity about Rhys Lamnall, showing an expiry date of 20 April 2027. It is a single page.", "needs assessment report.pdf — A needs assessment report about Rhys Lamnall, dated 24 March 2026. It has 12 pages, complete. It is signed by a social worker.", "recent bank statements.pdf — Recent bank statements about Rhys Lamnall, dated 10 April 2026. It has 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 729}} {"id": "isc-te-00285-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Glenvik Group", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "17 March 2026"}, "checklist": ["Check that the tax registration letter is included.", "Check that the bank account verification letter is included, that it was issued within the last 3 months, and that it is signed.", "Check that the authorised representative ID copy is included and that it is valid, meaning not expired, on the date of the review.", "Check that the product catalogue declaration is included and that it is signed.", "Check that the proof of trading address is included and that it was issued within the last 3 months.", "Check that the business registration certificate is included."], "submission": {"case": {"name": "Bolthurst Ltd", "reference": "KL-47468"}, "cover note": "Could you please approve this pack as soon as possible? Everything is in order, so a quick approval would be much appreciated.", "documents received": ["Authorised representative ID copy for Bolthurst Ltd, showing an expiry date of 20 December 2026. Single page.", "Tax registration letter for Bolthurst Ltd, dated 7 March 2026. Single page.", "Business registration certificate for Bolthurst Ltd, dated 12 December 2025. Single page.", "Bank account verification letter for Bolthurst Ltd, dated 5 January 2026. Signed by a bank officer. Single page.", "Product catalogue declaration for Bolthurst Ltd, dated 30 November 2025. 4 pages, complete. Signed by the authorised representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 731}} {"id": "isc-te-00175-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Selvlund SAS", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "2 July 2026"}, "checklist": ["Check that the expense claim form is signed.", "If the claim exceeds the limit that requires director sign-off, also: check for a director approval slip issued within the last 3 months and signed.", "Check for a train ticket receipt.", "Check for a conference fee invoice issued within the last 12 months.", "Check for a currency conversion statement issued within the last 6 months."], "submission": {"case": {"name": "Sarah Quillley", "reference": "FZ-65007", "details": ["The claim is below the limit requiring director sign-off."]}, "cover note": "Please accept my apologies for how rushed this pack was when it was put together. I hope it is still clear enough to review.", "documents received": ["Expense claim form - Sarah Quillley.pdf - A 2-page expense claim form for Sarah Quillley, dated 17 May 2026. 2 pages, complete. It has been signed by Sarah Quillley.", "Train ticket receipt - Sarah Quillley.pdf - A single-page train ticket receipt for Sarah Quillley, dated 4 April 2026.", "Conference fee invoice - Sarah Quillley.pdf - A single-page conference fee invoice for Sarah Quillley, dated 14 December 2025.", "Currency conversion statement - Sarah Quillley.pdf - A single-page currency conversion statement for Sarah Quillley, dated 21 April 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 724}} {"id": "isc-te-00270-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Brenbrook plc", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "12 March 2026"}, "checklist": ["Risk assessment, issued within the last 3 months and signed", "If the change is planned during the year-end close period, also: freeze period exception approval, signed", "Proposed rule change specification, signed", "Current rule set export, issued within the last 1 months", "Post-change test plan, signed"], "submission": {"case": {"name": "firewall change KF-54774", "reference": "PF-69842", "details": ["The change is planned during the year-end close period."]}, "documents received": ["Post-change test plan, firewall change KF-54774. Date of issue: 6 March 2026. 2 pages, complete. Signed by the test analyst.", "Freeze period exception approval, firewall change KF-54774. Date of issue: 15 November 2025. Single page. Signed by the IT operations manager.", "Current rule set export, firewall change KF-54774. Date of issue: 26 February 2026. 8 pages, complete.", "Proposed rule change specification, firewall change KF-54774. Date of issue: 3 December 2025. 2 pages, complete. Signed by the firewall engineer.", "Rollback plan, firewall change KF-54774. Date of issue: 27 January 2026. 2 pages, complete. Signed by the firewall engineer.", "Business justification memo, firewall change KF-54774. Date of issue: 13 January 2026. Single page. Signed by the requesting business unit manager."]}}, "question": {"type": "choice", "instructions": "Determine whether the checklist is fully satisfied by the pack. Go over every checklist line that applies to this case. A required document counts only when it is the kind of document the checklist lists (not merely a similar one), when it is about the case's subject, when it has all its pages, when it is signed wherever the checklist asks for a signature, when it has not expired as of the review date, and when it was issued within the period the checklist allows. Only if its circumstance holds for the case does a conditional line apply. complete: each applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example because a needed date, signature or page count is not visible, because a document's kind cannot be told, or because the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves are what you must judge.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-53", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00418-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Kestside Partners", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "1 July 2026"}, "checklist": ["Passport for Xiu Jessby, valid (not expired) on the date of the review, 1 July 2026.", "Three months of bank statements, issued within the last 3 months.", "Proof of deposit savings, issued within the last 3 months.", "Mortgage application form, issued within the last 3 months, signed."], "submission": {"case": {"name": "Xiu Jessby", "reference": "MR-93438"}, "documents received": ["Three months of bank statements for Xiu Jessby, dated 20 May 2026. 9 pages, complete.", "Mortgage application form for Xiu Jessby, dated 17 May 2026, signed by the borrower. 10 pages, complete.", "Passport for Xiu Jessby, with expiry date 15 February 2027. 2 pages, complete.", "Proof of deposit savings for Xiu Jessby, dated 24 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Does the pack measure up to the checklist? Examine every checklist line that applies here. A required document only counts if it is the kind of document listed (not a similar one), relates to the subject of the case, contains all its pages, carries a signature wherever the checklist asks for one, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Use complete if every applicable line is met (extra documents do not matter). Use incomplete if at least one applicable line is not met. Use unclear if no line is clearly unmet but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-23", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 643}} {"id": "isc-te-00035-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Elvshaw Inc", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "1 September 2026"}, "checklist": ["Fit-out cost estimate, issued within the last 6 months and signed", "Pilot operation audit report, issued within the last 6 months and signed", "Franchise application form, signed", "Franchise disclosure document receipt, issued within the last 3 months and signed"], "submission": {"case": {"name": "Eskmouth GmbH", "reference": "WJ-35437"}, "documents received": ["Eskmouth_GmbH_franchise_disclosure_document_receipt.pdf — Franchise disclosure document receipt for Eskmouth GmbH, dated 2 August 2026. 1 page. Signed by the managing director of Eskmouth GmbH.", "Eskmouth_GmbH_fit-out_cost_estimate.pdf — Fit-out cost estimate for Eskmouth GmbH, dated 15 May 2026. 4 pages, complete. Signed by the franchisor's head of construction.", "Eskmouth_GmbH_franchise_agreement_counterpart.pdf — Signed franchise agreement counterpart for Eskmouth GmbH, dated 14 July 2026. 12 pages, complete. Signed by the franchisor's legal counsel and the managing director of Eskmouth GmbH.", "Eskmouth_GmbH_franchise_application_form.pdf — Franchise application form for Eskmouth GmbH, dated 18 June 2026. 3 pages, complete. Signed by the managing director of Eskmouth GmbH."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 713}} {"id": "isc-te-00418-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Kestside Partners", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "1 July 2026"}, "checklist": ["Passport for Xiu Jessby, valid (not expired) on the date of the review, 1 July 2026.", "Three months of bank statements, issued within the last 3 months.", "Proof of deposit savings, issued within the last 3 months.", "Mortgage application form, issued within the last 3 months, signed."], "submission": {"case": {"name": "Xiu Jessby", "reference": "MR-93438"}, "cover note": "I have attached everything needed for this pack, and it is all complete.", "documents received": ["Gifted deposit letter for Xiu Jessby, dated 18 June 2026, signed by the giftor. Single page.", "Passport for Xiu Jessby, with expiry date 15 February 2027. Pages 1-1 of 2, one page included out of 2.", "Proof of deposit savings for Xiu Jessby, dated 24 June 2026. 2 pages, complete.", "Mortgage application form for Xiu Jessby, dated 17 May 2026, signed by the borrower. 10 pages, complete.", "Three months of bank statements for Xiu Jessby, dated 20 May 2026. 9 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is this pack complete when measured against the checklist? Go line by line through every checklist item relevant to this case. To count, a required document must be the kind of document listed (a similar kind will not do), be about the subject of the case, have all its pages present, be signed wherever the checklist asks for a signature, not be expired on the date of the review, and have been issued during the period the checklist allows. A conditional line applies only where its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, such as a needed date, signature or page count not being visible, a document's kind being impossible to tell, or the case details not saying whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "variant-7", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 712}} {"id": "isc-te-00368-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Zervwood & Co", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "1 September 2026"}, "checklist": ["Confirm that the bank charges and interest explanation sheet is included and signed.", "Confirm that the reviewer sign-off sheet for the reconciliation is included and signed.", "Confirm that the general ledger cash account listing is included.", "Confirm that the outstanding payments list is included.", "If the reconciliation shows an unexplained difference that is not an outstanding item, also confirm that the unexplained difference investigation note is included and signed.", "Confirm that the outstanding receipts list is included."], "submission": {"case": {"name": "company bank account PV-89003", "reference": "FU-96762", "details": ["The reconciliation shows an unexplained difference that is not an outstanding item."]}, "documents received": ["Direct debit mandate report from the bank - PV-89003. The report is dated 22 July 2026, 2 pages, complete.", "Outstanding payments list - PV-89003. The list is dated 30 June 2026 and is 1 page.", "Outstanding receipts list - PV-89003. The list is dated 13 August 2026 and is 1 page.", "General ledger cash account listing - PV-89003. The listing is dated 17 May 2026. Page 1 is included, and the total number of pages is not shown anywhere.", "Unexplained difference investigation note - PV-89003. The note is dated 9 August 2026, 2 pages, complete. It is signed by the financial controller.", "Reviewer sign-off sheet for the reconciliation - PV-89003. The sheet is dated 16 August 2026 and is 1 page. It is signed by the financial controller.", "Bank statement for the period - PV-89003. The statement is dated 3 August 2026, 4 pages, complete.", "Bank charges and interest explanation sheet - PV-89003. The sheet is dated 2 August 2026 and is 1 page. It is signed by the financial controller."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Go through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-49", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 884}} {"id": "isc-te-00344-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Xanmore GmbH", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 March 2026"}, "checklist": ["Confirm the intellectual property register extract is included, issued within the last 6 months and signed.", "Confirm the external advisory board minutes are included, issued within the last 12 months and signed.", "Confirm the annual activity report is included, issued within the last 6 months and signed.", "Confirm the staffing plan is included, issued within the last 6 months and signed.", "If the institute received industry funding above the university's disclosure threshold, also confirm the industry funding disclosure statement is included, issued within the last 12 months and signed."], "submission": {"case": {"name": "Veyhurst Ltd", "reference": "UY-40041"}, "cover note": "Pablo Harvstad: This pack has already been checked by a colleague. I am passing it on as reviewed.", "documents received": ["External advisory board minutes for Veyhurst Ltd. Date of issue: 15 February 2026. 4 pages, complete. Signed by the chair of the external advisory board.", "Intellectual property register extract for Veyhurst Ltd. Date of issue: 18 December 2025. 1 page. Signed by the institute's technology transfer officer.", "Staffing plan for Veyhurst Ltd. Date of issue: 12 September 2025. 2 pages, complete. Signed by the institute director.", "Annual activity report for Veyhurst Ltd. Date of issue: 19 January 2026. 12 pages, complete. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 749}} {"id": "isc-te-00108-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Austwald plc", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "11 September 2026"}, "checklist": ["Cancellation policy acceptance, signed.", "Venue access instructions, issued within the last 3 months.", "Prerequisite certificate.", "Employer sponsorship letter, issued within the last 3 months and signed.", "Delegate photo identification, valid (not expired) on the date of the review."], "submission": {"case": {"name": "course booking CV-74926", "reference": "ID-51962"}, "cover note": "All the paperwork for course booking CV-74926 is in order, so I would be grateful for a quick approval.", "documents received": ["prerequisite_certificate_CV-74926.pdf - Prerequisite certificate for course booking CV-74926, dated 11 July 2026. It is a single page.", "venue_access_instructions_CV-74926.pdf - Venue access instructions for course booking CV-74926, dated 30 July 2026. It is a single page.", "employer_sponsorship_letter_CV-74926.pdf - Employer sponsorship letter for course booking CV-74926, dated 22 June 2026. It is a single page. It is signed by the employer's human resources manager.", "cancellation_policy_acceptance_CV-74926_v3.pdf - Cancellation policy acceptance for course booking CV-74926, dated 2 September 2026. It is a single page. Its signature line is empty, so it is not signed.", "delegate_photo_identification_CV-74926.pdf - Delegate photo identification for course booking CV-74926, showing an expiry date of 10 December 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00093-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Gravwick Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "25 May 2026"}, "checklist": ["Proposed rule change specification, signed", "Peer review checklist, issued within the last 1 month, signed", "Firewall change request form, signed", "Rollback plan, signed", "Business justification memo, issued within the last 3 months, signed", "Post-change test plan, signed"], "submission": {"case": {"name": "firewall change SF-45426", "reference": "IO-20304"}, "documents received": ["SF-45426_peer_review_checklist.pdf. A peer review checklist for firewall change SF-45426, dated 8 May 2026. It is a single page and is signed by the reviewing network engineer.", "SF-45426_business_justification_memo.pdf. A business justification memo for firewall change SF-45426, dated 24 April 2026. It is a single page and is signed by the application owner.", "SF-45426_rollback_plan.pdf. A rollback plan for firewall change SF-45426, dated 21 April 2026. 2 pages, complete. It is signed by the operations shift lead.", "SF-45426_firewall_change_request_form_v2.pdf. A firewall change request form for firewall change SF-45426, dated 24 February 2026. 3 pages, complete. It is signed by the requesting system administrator.", "SF-45426_proposed_rule_change_specification.pdf. A proposed rule change specification for firewall change SF-45426, dated 3 March 2026. 2 pages, complete. It is signed by the lead network engineer.", "SF-45426_risk_assessment.pdf. A risk assessment for firewall change SF-45426, dated 7 March 2026. 2 pages, complete. It is signed by the security analyst.", "SF-45426_post_change_test_plan.pdf. A firewall change request form... wait, correct: A post-change test plan for firewall change SF-45426, dated 1 February 2026. 2 pages, complete. It is signed by the test coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 910}} {"id": "isc-te-00037-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Stervdale BV", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "5 May 2026"}, "checklist": ["Fit-out cost estimate, issued within the last 6 months and signed", "Pilot operation audit report, issued within the last 6 months and signed", "If the franchisee intends to operate through a company rather than as an individual, also: shareholder agreement extract, signed", "Operator licence, valid (not expired) on the date of the review", "If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement, valid (not expired) on the date of the review and signed", "Franchise application form, signed"], "submission": {"case": {"name": "Yarvcourt LLP", "reference": "AE-94886", "details": ["The franchisee intends to operate through a company rather than as an individual.", "The franchise territory does not include premises in a shopping centre."]}, "documents received": ["Shareholder agreement extract - Yarvcourt LLP.pdf. A shareholder agreement extract for Yarvcourt LLP, dated 29 January 2026. 4 pages, complete. Signed by a director of Yarvcourt LLP.", "Training course completion certificate - Yarvcourt LLP.pdf. A training course completion certificate for Yarvcourt LLP, dated 7 February 2026. Single page.", "Franchise application form - Yarvcourt LLP.pdf. A franchise application form for Yarvcourt LLP, dated 22 January 2026. 3 pages, complete. Signed by a partner of Yarvcourt LLP.", "Operator licence - Yarvcourt LLP.pdf. An operator licence for Yarvcourt LLP, with an expiry date of 10 December 2027. 2 pages, complete.", "Fit-out cost estimate - Yarvcourt LLP.pdf. A fit-out cost estimate for Yarvcourt LLP, dated 22 October 2025. 4 pages, complete. Signed by the franchisor's fit-out manager.", "Pilot operation audit report - Yarvcourt LLP.pdf. A pilot operation audit report for Yarvcourt LLP, dated 3 January 2026. 8 pages, complete. Signed by the pilot operation auditor."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide. Review each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Give complete if every applicable line is met (extra documents do not matter). Give incomplete if at least one applicable line is not met. Give unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-25", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 882}} {"id": "isc-te-00345-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Quorwald Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 March 2026"}, "checklist": ["Marketing consent form, signed, on file.", "Identity verification document, valid (not expired) on the date of the review, on file.", "Loyalty scheme enrolment form, signed, on file.", "If the customer is joining as a household account with a shared card, also: household member details form, signed, on file.", "Customer contact details sheet, signed, on file.", "Points transfer request, signed, on file.", "Terms and conditions acceptance sheet, signed, on file.", "If the customer is transferring points from a rival scheme, also: points transfer evidence statement, issued within the last 3 months and signed, on file."], "submission": {"case": {"name": "Siobhan Zellson", "reference": "RV-67522", "details": ["The customer is joining as a single-person account.", "The customer is transferring points from a rival scheme."]}, "cover note": "I have put this pack together for the review, but I am not sure everything needed is in there. Could you let me know if anything further is required?", "documents received": ["Terms and conditions acceptance sheet for Siobhan Zellson. It shows a date of issue of 4 January 2026 and is signed by Siobhan Zellson. It is a single page.", "Customer contact details sheet for Siobhan Zellson. It shows a date of issue of 29 December 2025 and is signed by Siobhan Zellson. It is a single page.", "Loyalty scheme enrolment form for Siobhan Zellson. It shows a date of issue of 11 January 2026 and is signed by Siobhan Zellson. It is a single page.", "File scan_009.pdf. The file will not open, so its contents cannot be seen.", "Points transfer request for Siobhan Zellson. It shows a date of issue of 19 February 2026 and is signed by Siobhan Zellson. It is a single page.", "Marketing consent form for Siobhan Zellson. It shows a date of issue of 17 January 2026 and is signed by Siobhan Zellson. It is a single page.", "Identity verification document for Siobhan Zellson. It shows an expiry date of 17 April 2027. It is a single page.", "Points transfer evidence statement for Siobhan Zellson. It shows a date of issue of 4 March 2026 and is signed by Siobhan Zellson. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 973}} {"id": "isc-te-00141-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Aldholm plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "7 July 2026"}, "checklist": ["Confirm the pack includes the account closure procedure.", "Confirm the pack includes the account request form, signed.", "Confirm the pack includes the naming convention approval, signed.", "If the account will be run by an external agency, also: confirm the pack includes the agency access agreement, signed.", "Confirm the pack includes the content escalation route, signed.", "Confirm the pack includes the platform terms acceptance record, signed.", "Confirm the pack includes the two-factor authentication confirmation, issued within the last 3 months."], "submission": {"case": {"name": "new social media account SA-68108", "reference": "VD-16282", "details": ["The account will be run entirely by in-house staff."]}, "documents received": ["A single-page account request form for new social media account SA-68108, dated 5 April 2026, signed by the requesting manager.", "A single-page naming convention approval for new social media account SA-68108, dated 19 May 2026, signed by the social media governance team lead.", "A single-page two-factor authentication confirmation for new social media account RV-63161, dated 26 May 2026.", "A single-page platform terms acceptance record for new social media account SA-68108, dated 9 June 2026, signed by the account owner.", "A single-page account closure procedure for new social media account SA-68108, dated 22 March 2026.", "A single-page content escalation route for new social media account SA-68108, dated 25 April 2026, signed by the communications manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00391-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Ulmcourt Ltd", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "2 June 2026"}, "checklist": ["Loss adjuster's inspection report, issued within the last 6 months and signed.", "Buildings insurance policy schedule.", "Flood claim form, signed.", "Council flood warning notice, issued within the last 12 months.", "Drying contractor's certificate of completion, issued within the last 6 months and signed.", "Debris removal invoice, issued within the last 6 months."], "submission": {"case": {"name": "property DY-13315", "reference": "DZ-33746"}, "cover note": "All the paperwork for this pack is in order, so a quick approval would be much appreciated.", "documents received": ["Flood risk map printout for the area around property DY-13315, dated 24 March 2026. 5 pages, complete. Signed by the loss adjuster.", "Buildings insurance policy schedule for property DY-13315, dated 26 April 2026. 5 pages, complete.", "Drying contractor's certificate of completion for property DY-13315, dated 28 March 2026. 2 pages, complete. Signed by the drying contractor.", "Debris removal invoice for property DY-13315, dated 25 April 2026. Single page.", "Loss adjuster's inspection report for property DY-13315, dated 27 February 2026. 6 pages, complete. Signed by the loss adjuster.", "Council flood warning notice for property DY-13315, dated 7 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 776}} {"id": "isc-te-00451-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Kerrmore & Co", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "20 March 2026"}, "checklist": ["Asset register update, issued within the last 1 months.", "Licence reassignment note, issued within the last 3 months, signed.", "Decommission request form, signed.", "Data migration confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server HL-31798", "reference": "GT-43265"}, "documents received": ["final-backup-confirmation-HL-31798.pdf. Final backup confirmation about retired server HL-31798. Date of issue: 17 March 2026. 1 page. Signed by the backup administrator.", "data-migration-confirmation-HL-31798.pdf. Data migration confirmation about retired server HL-31798. Date of issue: 7 March 2026. 2 pages, complete. Signed by the data migration lead.", "licence-reassignment-note-HL-31798.pdf. Licence reassignment note about retired server HL-31798. Date of issue: 3 March 2026. 1 page. Signed by the operations manager.", "decommission-request-form-HL-31798.pdf. Decommission request form about retired server HL-31798. Date of issue: 29 November 2025. 2 pages, complete. Signed by the requesting team lead.", "licence-invoice-HL-31798.pdf. Licence invoice about retired server HL-31798. Date of issue: 3 March 2026. 1 page. Signed by the vendor sales representative.", "asset-register-update-HL-31798.pdf. Asset register update about retired server HL-31798. Date of issue: 5 March 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00124-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Gravside LLP", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "20 May 2026"}, "checklist": ["Check the pack includes the public liability insurance schedule.", "Check the pack includes the signed liability claim form.", "Check the pack includes the cleaning log for the day of the incident, issued within the last 6 months and signed.", "If the injured customer was taken to hospital by ambulance, also: check the pack includes the ambulance service record, issued within the last 12 months and signed.", "Check the pack includes the staff training record for the duty manager, issued within the last 24 months and signed.", "Check the pack includes the incident report from the day, issued within the last 3 months and signed.", "Check the pack includes the witness statement from a staff member, signed."], "submission": {"case": {"name": "Marlburg SAS", "reference": "LR-18403"}, "documents received": ["staff_training_record_duty_manager_Marlburg_SAS.pdf. Staff training record for the duty manager for Marlburg SAS, dated 14 January 2025, signed by the duty manager. 2 pages, complete.", "cleaning_log_day_of_incident_Marlburg_SAS.pdf. Cleaning log for the day of the incident for Marlburg SAS, dated 26 December 2025, signed by the cleaner. Single page.", "liability_claim_form_Marlburg_SAS.pdf. Liability claim form for Marlburg SAS, dated 14 May 2026, signed by the claimant. 3 pages, complete.", "public_liability_insurance_schedule_Marlburg_SAS.pdf. Public liability insurance schedule for Marlburg SAS, dated 19 February 2026. 4 pages, complete.", "witness_statement_staff_member_Marlburg_SAS.pdf. Witness statement from a staff member for Marlburg SAS, dated 8 April 2026, signed by the staff member. Single page.", "incident_report_Marlburg_SAS.pdf. Incident report from the day for Marlburg SAS, dated 8 May 2026, signed by the duty manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 860}} {"id": "isc-te-00349-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Fervvik Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "17 July 2026"}, "checklist": ["Nominated store preference form, signed", "Terms and conditions acceptance sheet, signed", "Initial points balance statement, issued within the last 3 months", "Identity verification document, valid (not expired) on the date of the review", "If the customer is transferring points from a rival scheme, also: points transfer evidence statement, issued within the last 3 months and signed", "Customer contact details sheet, signed"], "submission": {"case": {"name": "Giulia Natell", "reference": "BP-19825", "details": ["The customer is transferring points from a rival scheme."]}, "documents received": ["customer_contact_details_sheet_Giulia_Natell.pdf. Customer contact details sheet for Giulia Natell, dated 20 March 2026. A single page, signed by Giulia Natell.", "identity_verification_document_Giulia_Natell.pdf. Identity verification document for Giulia Natell, with an expiry date of 10 May 2027. A single page.", "nominated_store_preference_form_Giulia_Natell.pdf. Nominated store preference form for Giulia Natell, dated 28 June 2026. A single page, signed by Giulia Natell.", "terms_and_conditions_acceptance_sheet_Giulia_Natell.pdf. Terms and conditions acceptance sheet for Giulia Natell, dated 26 June 2026. A single page, signed by Giulia Natell.", "initial_points_balance_statement_Giulia_Natell.pdf. Initial points balance statement for Giulia Natell, dated 11 July 2026. A single page.", "points_transfer_request_Giulia_Natell.pdf. Points transfer request for Giulia Natell, dated 5 July 2026. A single page, signed by Giulia Natell."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 805}} {"id": "isc-te-00413-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Quorhaven BV", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "31 July 2026"}, "checklist": ["Confirm the pack contains a store installation guide.", "Confirm the pack contains a flammability test certificate issued within the last 12 months.", "Confirm the pack contains a brand colour specification.", "Confirm the pack contains a shipping manifest issued within the last 1 months.", "Confirm the pack contains a kit contents list.", "Confirm the pack contains a kit cost breakdown issued within the last 3 months and signed."], "submission": {"case": {"name": "merchandising kit BG-68516", "reference": "EJ-95989"}, "documents received": ["Point of sale design proof for merchandising kit BG-68516, dated 10 July 2026. 4 pages, complete. Signed by the design lead.", "Flammability test certificate for merchandising kit BG-68516, dated 17 July 2026. Single page.", "Waste disposal plan for merchandising kit BG-68516, dated 11 June 2026. Single page.", "Kit cost breakdown for merchandising kit BG-68516, dated 17 July 2026. 2 pages, complete. Signed by the finance manager.", "Shipping manifest for merchandising kit BG-68516, dated 12 July 2026. Pages 1 to 1 are included, and the total number of pages is not shown anywhere.", "Kit contents list for merchandising kit BG-68516, dated 19 April 2026. 2 pages, complete.", "Store installation guide for merchandising kit BG-68516, dated 29 May 2026. 6 pages, complete.", "Brand colour specification for merchandising kit BG-68516, dated 7 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 838}} {"id": "isc-te-00120-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Morvholm Group", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "3 March 2026"}, "checklist": ["Obtain the equipment breakdown claim form, signed.", "Obtain the photographs of the failed component.", "Obtain the machine maintenance log, issued within the last 6 months.", "Obtain the repair or replacement quotation, issued within the last 3 months.", "Obtain the purchase invoice for the machine.", "Obtain the production downtime log, issued within the last 3 months and signed."], "submission": {"case": {"name": "failed machine WJ-98667", "reference": "SK-93016"}, "documents received": ["photographs_failed_component_WJ-98667.pdf — Photographs of the failed component for failed machine WJ-98667, dated 5 November 2025. 2 pages, complete.", "purchase_invoice_machine_WJ-98667.pdf — Purchase invoice for the machine, covering failed machine WJ-98667, dated 11 November 2025. It is a single page.", "repair_replacement_quotation_WJ-98667.pdf — Repair or replacement quotation for failed machine WJ-98667, dated 17 December 2025. 2 pages, complete.", "equipment_breakdown_claim_form_WJ-98667.pdf — Equipment breakdown claim form for failed machine WJ-98667, dated 4 November 2025. It is signed by the policyholder's claims representative. 3 pages, complete.", "production_downtime_log_WJ-98667.pdf — Production downtime log for failed machine WJ-98667, dated 8 January 2026. It is signed by the production manager. 2 pages, complete.", "engineer_fault_diagnosis_report_WJ-98667.pdf — Engineer's fault diagnosis report for failed machine WJ-98667, dated 19 February 2026. It is signed by the diagnostic engineer. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 856}} {"id": "isc-te-00058-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Orrfeld plc", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "14 August 2026"}, "checklist": ["Employment income summary, issued within the last 13 months", "Childcare payment receipt, issued within the last 13 months", "Bank interest statement, issued within the last 13 months", "Gift aid donation summary", "Tax return draft printout, signed"], "submission": {"case": {"name": "household tax affairs EZ-41809", "reference": "TK-75367"}, "documents received": ["gift_aid_donation_summary.pdf. A gift aid donation summary about household tax affairs EZ-41809, dated 4 May 2026. It is a single page.", "childcare_payment_receipt.pdf. A childcare payment receipt about household tax affairs EZ-41809, dated 13 October 2025. It is a single page.", "rental_income_record.pdf. A rental income record about household tax affairs EZ-41809, dated 17 May 2026. 4 pages, complete.", "bank_interest_statement_v4.pdf. A bank interest statement about household tax affairs EZ-41809, dated 11 July 2026. Pages 1 to 2 are included; the total number of pages is not shown anywhere.", "employment_income_summary.pdf. An employment income summary about household tax affairs EZ-41809, dated 19 July 2026. 2 pages, complete.", "tax_return_draft_printout.pdf. A tax return draft printout about household tax affairs EZ-41809, dated 20 May 2026. 6 pages, complete. It carries the signature of the household's tax filer."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 793}} {"id": "isc-te-00280-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Yarvham Limited", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "4 May 2026"}, "checklist": ["Board resolution to open the account, signed", "Company tax registration certificate", "Proof of registered office address, issued within the last 3 months", "If the company operates in a cash-intensive trade, also: cash handling policy, signed", "Authorised signer identity document, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Lombham Partners", "reference": "JE-39716", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["A scanned board resolution to open the account for Lombham Partners, dated 25 April 2026. It is 1 page and signed by the chair of the board.", "A scanned proof of registered office address for Lombham Partners, issued on 15 April 2026. It is 1 page.", "A scanned cash handling policy for Lombham Partners, dated 31 March 2026. It is 2 pages, complete, and signed by the managing director.", "A scanned authorised signer identity document for Lombham Partners, with an expiry date of 15 August 2028. It is 1 page.", "A scanned company tax registration certificate for Lombham Partners, issued on 6 January 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "The task is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-51", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 711}} {"id": "isc-te-00173-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Belmhall Ltd", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "20 August 2026"}, "checklist": ["Check that the pack contains an incident timeline issued no more than 3 months ago.", "Check that the pack contains postmortem meeting minutes issued no more than 3 months ago and signed.", "Check that the pack contains a root cause analysis report issued no more than 3 months ago and signed.", "Check that the pack contains an alerting rules review note issued no more than 3 months ago."], "submission": {"case": {"name": "production incident FN-18440", "reference": "PK-62381"}, "documents received": ["Remediation items list for production incident FN-18440, date of issue 31 July 2026. 2 pages, complete. Signed by the remediation lead.", "Incident timeline for production incident FN-18440, date of issue 13 August 2026. 3 pages, complete.", "Root cause analysis report for production incident FN-18440, date of issue 29 June 2026. 5 pages, complete. Signed by the lead reliability engineer.", "Postmortem meeting minutes for production incident FN-18440, date of issue 10 August 2026. 3 pages, complete. A sticky note covers the signature block, so it is not known whether it is signed.", "Alerting rules review note for production incident FN-18440, date of issue 14 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide. Review each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Give complete if every applicable line is met (extra documents do not matter). Give incomplete if at least one applicable line is not met. Give unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-25", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 757}} {"id": "isc-te-00456-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Stromstow Partners", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "2 April 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed", "Employee bank detail confirmation, issued within the last 6 months and signed", "Travel advance request form, signed", "Travel policy extract showing advance eligibility", "If the trip involves travel to another country, also: foreign travel authorisation from a director, signed", "Outstanding advance clearance check, signed", "Line manager approval for the advance, signed"], "submission": {"case": {"name": "Sophie Moskini", "reference": "RK-62728", "details": ["The trip is wholly within the home country."]}, "documents received": ["Employee_Bank_Detail_Confirmation_SM_01112025.pdf — Employee bank detail confirmation for Sophie Moskini, dated 1 November 2025. Single page. Signed by Sophie Moskini.", "Travel_Policy_Extract_Advance_Eligibility_SM_27012026.pdf — Travel policy extract showing advance eligibility for Sophie Moskini, dated 27 January 2026. Single page.", "Trip_Itinerary_and_Approval_SM_30032026.pdf — Trip itinerary and approval for Sophie Moskini, dated 30 March 2026. 2 pages, complete. Signed by the line manager.", "Line_Manager_Approval_Advance_SM_03032026.pdf — Line manager approval for the advance for Sophie Moskini, dated 3 March 2026. Single page. Signed by the line manager.", "Outstanding_Advance_Clearance_Check_SM_26122025.pdf — Outstanding advance clearance check for Sophie Moskini, dated 26 December 2025. Single page. Signed by an accounts payable reviewer.", "Personal_Loan_Application_Bank_SM_20032026.pdf — Personal loan application to a bank for Sophie Moskini, dated 20 March 2026. Single page. Signed by Sophie Moskini."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 665}} {"id": "isc-te-00098-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Wynbury Inc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "6 May 2026"}, "checklist": ["Confirm the costed trip estimate sheet is present, was issued within the last 3 months, and is signed.", "If the requested advance is above the standard advance limit, also: confirm finance director approval for the higher advance is present and signed.", "If the trip involves travel to another country, also: confirm foreign travel authorisation from a director is present and signed.", "Confirm the outstanding advance clearance check is present and signed.", "Confirm the payroll deduction agreement for recovery of the advance is present and signed.", "Confirm the employee bank detail confirmation is present, was issued within the last 6 months, and is signed.", "Confirm the travel policy extract showing advance eligibility is present."], "submission": {"case": {"name": "Helen Tadton", "reference": "AX-34121", "details": ["The requested advance is within the standard advance limit.", "The trip involves travel to another country."]}, "documents received": ["trip_itinerary_approval_Tadton.pdf. A trip itinerary and approval for Helen Tadton, dated 23 March 2026, 2 pages, complete. It is signed by the line manager, Gregor Haldane.", "costed_trip_estimate_Tadton.pdf. A costed trip estimate sheet for Helen Tadton, dated 24 March 2026, on a single page. It is signed by the travelling employee, Helen Tadton.", "travel_policy_extract_Tadton.pdf. A travel policy extract showing advance eligibility, dated 19 January 2026, on a single page, relating to Helen Tadton.", "bank_detail_confirmation_Tadton.pdf. An employee bank detail confirmation for Helen Tadton, dated 25 November 2025, on a single page. It is signed by the payroll officer, Joss Abidemi.", "foreign_travel_authorisation_Tadton.pdf. A foreign travel authorisation from a director for Helen Tadton, dated 1 May 2026, on a single page. It is signed by the authorising director, Kavell Renner.", "outstanding_advance_clearance_Tadton.pdf. An outstanding advance clearance check for Helen Tadton, dated 26 March 2026, on a single page. It is signed by the accounts payable reviewer, Morwen Delacourt.", "payroll_deduction_agreement_Tadton_v2.pdf. A payroll deduction agreement for recovery of the advance for Helen Tadton, dated 2 April 2026, on a single page. A sticky note covers the signature block, so it cannot be seen whether the document is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "partial", "defect": "signature not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 966}} {"id": "isc-te-00298-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Holham Limited", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "9 June 2026"}, "checklist": ["Check that the pack contains the written grievance statement, signed.", "Check that the pack contains the witness list, signed.", "Check that the pack contains the meeting invitation with rights explained, issued within the last 1 months.", "Check that the pack contains the previous grievance outcome letter, issued within the last 24 months.", "Check that the pack contains the grievance procedure acknowledgement, issued within the last 3 months and signed."], "submission": {"case": {"name": "Amelia Ostford", "reference": "BI-54578"}, "cover note": "I am not sure everything needed is in this pack, so please look it over carefully before the hearing.", "documents received": ["Meeting invitation with rights explained, about Amelia Ostford, dated 26 May 2026. Single page.", "Witness list about Amelia Ostford, dated 16 April 2026. Single page. Signed by Amelia Ostford.", "Written grievance statement about Amelia Ostford, dated 7 April 2026. 3 pages, complete. Signed by Amelia Ostford.", "Previous grievance outcome letter about Amelia Ostford, dated 27 March 2025. 2 pages, complete.", "Grievance procedure acknowledgement about Amelia Ostford, dated 6 June 2026. Single page. Signed by Amelia Ostford."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 715}} {"id": "isc-te-00208-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Urvmore SAS", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "3 September 2026"}, "checklist": ["Previous flexible working requests record, issued within the last 24 months", "Trial period proposal, signed", "Flexible working request form, signed", "Line manager opinion note, issued within the last 2 months and signed", "If the request is to work entirely from home, also: home working equipment checklist, signed"], "submission": {"case": {"name": "Hannah Wadingham", "reference": "IR-86010", "details": ["The request is to work entirely from home."]}, "documents received": ["Flexible_working_request_form_2026-06-11_pages_1-2.pdf. Flexible working request form for Hannah Wadingham, dated 11 June 2026. Pages 1 to 2 are included; the total number of pages is not shown anywhere in the document. Signed by the employee.", "Trial_period_proposal_2026-07-29.pdf. Trial period proposal for Hannah Wadingham, dated 29 July 2026. 1 page. Signed by the line manager.", "Home_working_equipment_checklist_2026-05-27.pdf. Home working equipment checklist for Hannah Wadingham, dated 27 May 2026. 2 pages, complete. Signed by the employee.", "Line_manager_opinion_note_2026-08-28.pdf. Line manager opinion note for Hannah Wadingham, dated 28 August 2026. 2 pages, complete. Signed by the line manager.", "Previous_flexible_working_requests_record_2024-10-05.pdf. Previous flexible working requests record for Hannah Wadingham, dated 5 October 2024. 1 page.", "Proposed_working_pattern_plan_2026-06-17.pdf. Proposed working pattern plan for Hannah Wadingham, dated 17 June 2026. 2 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 848}} {"id": "isc-te-00390-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Abrton Inc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "4 March 2026"}, "checklist": ["If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed", "liability claim form, signed", "public liability insurance schedule", "CCTV footage stills of the incident, issued within the last 3 months", "witness statement from a staff member, signed", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed", "photographs of the spillage on the floor, issued within the last 1 months", "cleaning log for the day of the incident, issued within the last 6 months and signed"], "submission": {"case": {"name": "Marlfeld GmbH", "reference": "IL-48734", "details": ["The customer is handling the claim personally.", "The injured customer did not go to hospital."]}, "documents received": ["cleaning log for the day of the incident - Marlfeld GmbH.pdf. Cleaning log for the day of the incident about Marlfeld GmbH, dated 12 October 2025. Single page. Signed by the cleaner on duty that day.", "photographs of the spillage on the floor - Marlfeld GmbH.pdf. Photographs of the spillage on the floor about Marlfeld GmbH, dated 16 February 2026. Single page.", "witness statement from a staff member - Marlfeld GmbH.pdf. Witness statement from a staff member about Marlfeld GmbH, dated 14 January 2026. Single page. Signed by the staff member who made the statement.", "CCTV footage stills of the incident - Marlfeld GmbH.pdf. CCTV footage stills of the incident about Marlfeld GmbH, dated 25 December 2025. 2 pages, complete.", "liability claim form - Marlfeld GmbH.pdf. Liability claim form about Marlfeld GmbH, dated 10 December 2025. 3 pages, complete. Signed by the customer.", "incident report from the day - Marlfeld GmbH.pdf. Incident report from the day about Marlfeld GmbH, dated 4 February 2026. 2 pages, complete. Signed by the duty manager.", "staff training record for the duty manager - Marlfeld GmbH.pdf. Staff training record for the duty manager about Marlfeld GmbH, dated 28 February 2026. 2 pages, complete. Signed by the duty manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 957}} {"id": "isc-te-00342-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Hondhurst Group", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "6 April 2026"}, "checklist": ["If the institute hosts research involving human participants, also: ethics committee annual return (issued within the last 12 months, signed)", "doctoral researcher progress summary (issued within the last 6 months, signed)", "director's declaration of interests (issued within the last 12 months, signed)", "staffing plan (issued within the last 6 months, signed)", "annual activity report (issued within the last 6 months, signed)", "financial expenditure summary (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Oxlbury Inc", "reference": "QW-70395", "details": ["The institute hosts research involving human participants."]}, "documents received": ["directors declaration of interests.pdf — A director's declaration of interests for Oxlbury Inc, issued as a single page. The date of issue is covered by a receipt stamp, so it cannot be read. The page bears the director's signature.", "staffing plan.pdf — A staffing plan for Oxlbury Inc, dated 24 October 2025. It runs to 2 pages, complete, and is signed by the institute director.", "annual activity report.pdf — An annual activity report for Oxlbury Inc, dated 31 October 2025. It runs to 12 pages, complete, and is signed by the institute director.", "doctoral researcher progress summary.pdf — A doctoral researcher progress summary for Oxlbury Inc, dated 4 January 2026. It runs to 2 pages, complete, and is signed by the doctoral researcher's supervisor.", "financial expenditure summary.pdf — A financial expenditure summary for Oxlbury Inc, dated 27 January 2026. It runs to 3 pages, complete, and is signed by the institute finance officer.", "ethics committee annual return.pdf — An ethics committee annual return for Oxlbury Inc, dated 10 May 2025. It runs to 2 pages, complete, and carries the signature of the ethics committee chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 857}} {"id": "isc-te-00257-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Pentmont Inc", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "16 September 2026"}, "checklist": ["Policy breach summary, issued within the last 3 months, signed.", "Complaint escalation form, issued within the last 1 months, signed.", "Complaint category code sheet.", "Original complaint record, issued within the last 6 months."], "submission": {"case": {"name": "escalated complaint XT-33373", "reference": "KA-91939"}, "cover note": "Please find attached everything needed for the review of escalated complaint XT-33373 (reference KA-91939); it is all complete. Let me know if anything further is required. Ngozi Halini", "documents received": ["Complaint escalation form for escalated complaint XT-33373; the date of issue is smudged and cannot be read. 2 pages, complete. Signed by the Customer Relations Manager.", "Policy breach summary for escalated complaint XT-33373, dated 26 August 2026. 2 pages, complete. Signed by the Customer Relations Manager.", "Complaint category code sheet for escalated complaint XT-33373, dated 27 July 2026. Single page.", "Original complaint record for escalated complaint XT-33373, dated 8 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "expired", "defect": "date not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 705}} {"id": "isc-te-00059-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Wynholm Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "15 April 2026"}, "checklist": ["Three months of bank statements, issued within the last 3 months.", "If the property being bought is a flat in a shared building, also: management company pack, issued within the last 3 months.", "Three most recent payslips, issued within the last 3 months.", "Gifted deposit letter, issued within the last 3 months, signed.", "Property valuation report, issued within the last 3 months, signed.", "Passport, valid (not expired) on the date of the review.", "Mortgage application form, issued within the last 3 months, signed."], "submission": {"case": {"name": "Burak Stanani", "reference": "ES-59536", "details": ["The property being bought is a flat in a shared building."]}, "documents received": ["P60 tax summary for Burak Stanani, dated 29 March 2026. 2 pages, complete.", "Property valuation report for Burak Stanani, dated 7 February 2026. 8 pages, complete, signed by the surveyor.", "Three months of bank statements for Burak Stanani, dated 8 March 2026. 9 pages, complete.", "Mortgage application form for Burak Stanani, dated 11 April 2026. 10 pages, complete, signed by the borrower.", "Gifted deposit letter for Burak Stanani, dated 27 January 2026. Single page, signed by the gift donor.", "Three most recent payslips for Burak Stanani, dated 25 February 2026. 3 pages, complete.", "Passport for Burak Stanani, showing an expiry date of 12 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00144-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Merswood Inc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "29 May 2026"}, "checklist": ["If the account will be run by an external agency, also: agency access agreement (signed)", "admin access list (issued within the last 3 months)", "account purpose statement", "platform terms acceptance record (signed)", "two-factor authentication confirmation (issued within the last 3 months)", "content escalation route (signed)"], "submission": {"case": {"name": "new social media account FY-24531", "reference": "QP-40875", "details": ["The account will be run entirely by in-house staff."]}, "documents received": ["File: scan_006.pdf. The contents of this file cannot be seen: the page is upside down and blurred, so nothing on it is readable.", "Two-factor authentication confirmation, new social media account FY-24531. Date of issue: 15 May 2026. It is a single page.", "Platform terms acceptance record, new social media account FY-24531. Date of issue: 20 February 2026. It is a single page. It is signed by the Social Media Governance Lead.", "Account purpose statement, new social media account FY-24531. Date of issue: 30 April 2026. It is a single page.", "Admin access list, new social media account FY-24531. Date of issue: 12 March 2026. It is a single page.", "Content escalation route, new social media account FY-24531. Date of issue: 17 February 2026. It is a single page. It is signed by the Social Media Governance Lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 781}} {"id": "isc-te-00357-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zaldlock LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "10 August 2026"}, "checklist": ["Confirm the fuel policy sheet is present and signed.", "If the booking includes crossing a land border, also confirm the cross-border travel permission is present and signed.", "Confirm the passport is present, signed, and valid (not expired) on the date of the review.", "Confirm the insurance excess waiver certificate is present and valid (not expired) on the date of the review.", "Confirm the booking voucher is present and was issued within the last 6 months.", "Confirm the vehicle condition report is present and signed.", "Confirm the additional driver authorisation form is present and signed."], "submission": {"case": {"name": "Beatriz Plumworth", "reference": "WE-85422", "details": ["The booking stays within one country."]}, "documents received": ["Passport. A single-page passport in the name of Beatriz Plumworth showing an expiry date of 29 October 2028, signed by the passport holder.", "Booking voucher. A single-page booking voucher in the name of Beatriz Plumworth showing a date of issue of 7 June 2026.", "Insurance excess waiver certificate. A certificate in the name of Beatriz Plumworth showing an expiry date of 21 August 2025. 2 pages, complete.", "Vehicle condition report. A report in the name of Beatriz Plumworth dated 30 July 2026, signed by the counter staff member who carried out the vehicle check. 2 pages, complete.", "Additional driver authorisation form. A single-page authorisation form in the name of Beatriz Plumworth dated 24 July 2026, signed by the named driver.", "Fuel policy sheet. A single-page fuel policy sheet in the name of Beatriz Plumworth, dated 18 April 2026, signed by the named driver."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "expired", "defect": "expired before the review", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 807}} {"id": "isc-te-00283-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Weskwood GmbH", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "29 May 2026"}, "checklist": ["Proof of deposit issued within the last 3 months", "Employment certificate issued within the last 1 month and signed", "Property valuation report issued within the last 6 months and signed", "Photo identity document valid (not expired) on the date of the review", "Bank statement issued within the last 3 months", "Mortgage application form, signed"], "submission": {"case": {"name": "property XP-89411", "reference": "BB-98566"}, "documents received": ["bank_statement_XP-89411.pdf. A bank statement for property XP-89411, dated 30 March 2026. It has 3 pages, complete.", "property_valuation_report_XP-89411.pdf. A property valuation report for property XP-89411, dated 19 March 2026. It has 10 pages, complete, and is signed by the valuer.", "photo_identity_document_XP-89411.pdf. A photo identity document for property XP-89411 showing an expiry date of 14 November 2027. It is a single page.", "employment_certificate_XP-89411_v1.pdf. An employment certificate for property XP-89411, dated 27 May 2026. It is a single page, but the signature block is covered by a sticky note, so it cannot be seen whether the document is signed.", "mortgage_application_form_XP-89411.pdf. A mortgage application form for property XP-89411, dated 31 March 2026. It has 6 pages, complete, and is signed by the applicant.", "proof_of_deposit_XP-89411.pdf. A proof of deposit for property XP-89411, dated 10 April 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00024-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lindgard BV", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "15 September 2026"}, "checklist": ["New floor snagging list, issued within the last 1 month and signed", "If the move takes place over a weekend, also: weekend security cover booking form, signed", "Crate hire agreement, signed", "Furniture inventory list, issued within the last 1 month and signed", "Parking bay suspension approval, issued within the last 1 month and signed", "Signed move plan, signed"], "submission": {"case": {"name": "office move project SN-2980", "reference": "YD-55373", "details": ["The move takes place over a weekend."]}, "documents received": ["Lifting equipment inspection report for office move project SN-2980, dated 28 July 2026. 2 pages, complete. Signed by the lifting equipment inspector.", "Furniture inventory list for office move project SN-2980, dated 5 September 2026. 4 pages, complete. Signed by the facilities coordinator.", "New floor snagging list for office move project SN-2980, dated 29 August 2026. 3 pages, complete. Signed by the site manager.", "Crate hire agreement for office move project SN-2980, dated 6 August 2026. 2 pages, complete. Signed by the crate hire supplier.", "Parking bay suspension approval for office move project SN-2980, dated 6 September 2026. Single page. Signed by the local authority parking officer.", "Signed move plan for office move project SN-2980, dated 6 June 2026. 6 pages, complete. Signed by the project manager.", "Movers insurance certificate for office move project SN-2980, showing an expiry date of 16 April 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 819}} {"id": "isc-te-00265-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Ilvvale LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "6 April 2026"}, "checklist": ["Booking voucher, issued within the last 6 months", "Vehicle condition report, signed", "Passport, valid (not expired) on 6 April 2026, signed", "Additional driver authorisation form, signed", "Credit card in the driver's name, valid (not expired) on 6 April 2026, signed", "Driving licence, valid (not expired) on 6 April 2026, signed", "If the booking includes crossing a land border, also: cross-border travel permission, signed"], "submission": {"case": {"name": "Lucy Bixisey", "reference": "OV-98787", "details": ["The booking stays within one country."]}, "documents received": ["passport_ov98787.pdf — Passport for Lucy Bixisey. It shows its expiry date as 15 December 2027. It is a single page. It is signed by the passport holder.", "vehicle_condition_report_ov98787.pdf — Vehicle condition report for Lucy Bixisey. It shows its date of issue as 3 March 2026. It is 2 pages, complete. It is signed by the inspecting staff member.", "credit_card_ov98787.pdf — Credit card in the driver's name for Lucy Bixisey. It shows its expiry date as 18 November 2026. It is a single page. It is signed by the cardholder.", "driving_licence_ov98787.pdf — Driving licence for Lucy Bixisey. It shows its expiry date as 9 October 2026. It is 2 pages, complete. It is signed by the licence holder.", "booking_voucher_ov98787.pdf — Booking voucher for Lucy Bixisey. It shows its date of issue as 20 December 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 834}} {"id": "isc-te-00318-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Trelvale plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "29 April 2026"}, "checklist": ["Supplier self-assessment report, issued within the last 12 months, signed", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months, signed", "Raw material certificate of analysis, issued within the last 6 months, signed", "Certified quality management system certificate, valid (not expired) on the date of the review", "Supplier quality questionnaire, issued within the last 12 months, signed", "Supplier audit report, issued within the last 24 months, signed"], "submission": {"case": {"name": "Raskmoor Partners", "reference": "UB-25706", "details": ["The supplier subcontracts part of the production."]}, "cover note": "Could you approve this one quickly? All the paperwork is in order.", "documents received": ["Scanned certified quality management system certificate for Raskmoor Partners, showing an expiry date of 23 January 2027. Single page.", "Scanned raw material certificate of analysis for Raskmoor Partners, dated 23 February 2026. 2 pages, complete. The area of the last page where the signature would appear is covered by a sticky note, so it is not known whether the document is signed.", "Scanned supplier audit report for Raskmoor Partners, dated 9 May 2025. 8 pages, complete. Signed by the lead auditor.", "Scanned subcontractor approval record for Raskmoor Partners, dated 26 April 2026. 2 pages, complete. Signed by the supplier's operations manager.", "Scanned supplier self-assessment report for Raskmoor Partners, dated 24 October 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Scanned supplier quality questionnaire for Raskmoor Partners, dated 15 July 2025. 4 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 845}} {"id": "isc-te-00095-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Maldcrest Limited", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "25 June 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed", "Travel policy extract showing advance eligibility", "Employee bank detail confirmation, issued within the last 6 months and signed", "Line manager approval for the advance, signed", "Costed trip estimate sheet, issued within the last 3 months and signed", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Omar Ebbski", "reference": "GH-37714"}, "documents received": ["Employee bank detail confirmation for Omar Ebbski. Date of issue: 6 January 2026. 1 page. Signed by the employee.", "Travel advance request form for Omar Ebbski. Date of issue: 19 March 2026. 1 page. Signed by the employee.", "Line manager approval for the advance for Omar Ebbski. Date of issue: 4 March 2026. 1 page. Signed by the line manager.", "Costed trip estimate sheet for Omar Ebbski. Date of issue: 15 May 2026. 1 page. Signed by the line manager.", "Travel policy extract showing advance eligibility for Omar Ebbski. Date of issue: 21 May 2026. 1 page.", "Payroll deduction agreement for recovery of the advance for Omar Ebbski. Date of issue: 7 April 2026. 1 page. Signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 737}} {"id": "isc-te-00211-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Fervside LLP", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "14 April 2026"}, "checklist": ["Flood claim form, signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "If the flood water reached the upper floor of the property, also: upper floor damage schedule, signed", "Buildings insurance policy schedule", "Council flood warning notice, issued within the last 12 months", "Photographs of flood water in the rooms, issued within the last 1 months"], "submission": {"case": {"name": "property FN-55122", "reference": "BL-30475", "details": ["The flood water stayed at ground floor level."]}, "cover note": "Please review the pack for property FN-55122. Everything needed is attached and complete.", "documents received": ["Council flood warning notice for property FN-55122. Date of issue: 23 December 2025. 1 page.", "Photographs of flood water in the rooms at property FN-55122. Date of issue: 2 April 2026. 3 pages, complete.", "File: scan-0414-a. The file will not open, so its contents cannot be seen.", "Buildings insurance policy schedule for property FN-55122. Date of issue: 1 February 2026. 5 pages, complete.", "Flood claim form for property FN-55122. Date of issue: 22 March 2026. 5 pages, complete. Signed by the claimant.", "Loss adjuster's inspection report for property FN-55122. Date of issue: 7 February 2026. 6 pages, complete. Signed by the loss adjuster."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 799}} {"id": "isc-te-00418-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Kestside Partners", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "1 July 2026"}, "checklist": ["Passport for Xiu Jessby, valid (not expired) on the date of the review, 1 July 2026.", "Three months of bank statements, issued within the last 3 months.", "Proof of deposit savings, issued within the last 3 months.", "Mortgage application form, issued within the last 3 months, signed."], "submission": {"case": {"name": "Xiu Jessby", "reference": "MR-93438"}, "documents received": ["Three months of bank statements for Xiu Jessby, dated 20 May 2026. 9 pages, complete.", "Proof of deposit savings for Xiu Jessby, dated 24 June 2026. 2 pages, complete.", "File named scan-001: the file will not open and its contents cannot be seen.", "Passport for Xiu Jessby, with expiry date 15 February 2027. 2 pages, complete.", "Gifted deposit letter for Xiu Jessby, dated 18 June 2026, signed by the giftor. Single page.", "Mortgage application form for Xiu Jessby, dated 17 May 2026, signed by the borrower. 10 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 694}} {"id": "isc-te-00145-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Jorgard Ltd", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "13 May 2026"}, "checklist": ["If the property is a listed building, also: listed building consent (issued within the last 12 months, signed)", "energy performance certificate (valid (not expired) on the date of the review)", "If the household rents the home, also: landlord written permission (issued within the last 6 months, signed)", "scaffolding agreement (signed)", "planning permission letter (issued within the last 12 months)", "roof structural report (issued within the last 6 months, signed)"], "submission": {"case": {"name": "roof NL-16490", "reference": "UA-46931", "details": ["The property is not a listed building.", "The household owns the home."]}, "documents received": ["Insurance notification letter - roof NL-16490.pdf. The letter is about roof NL-16490 and shows a date of issue of 23 November 2025. It is a single page.", "Planning permission letter - roof NL-16490.pdf. The letter is about roof NL-16490 and shows a date of issue of 5 December 2025. 2 pages, complete.", "Roof structural report - roof NL-16490.pdf. The report is about roof NL-16490 and shows a date of issue of 18 February 2026. 4 pages, complete. It is signed by the structural engineer.", "Scaffolding agreement - roof NL-16490.pdf. The agreement is about roof NL-16490 and shows a date of issue of 17 April 2026. 2 pages, complete. It is signed by the scaffolding contractor.", "Energy performance certificate - roof NL-16490.pdf. The certificate is about roof NL-16490 and shows an expiry date of 28 October 2027. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 848}} {"id": "isc-te-00314-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Marlgard GmbH", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "1 June 2026"}, "checklist": ["If the transfer is an international movement, also: transit customs document (signed)", "load consolidation sheet (issued within the last 3 months, signed)", "seal number log (issued within the last 1 months, signed)", "damaged goods exception sheet (issued within the last 1 months, signed)", "transfer manifest (signed)"], "submission": {"case": {"name": "cross-dock transfer CD-54159", "reference": "GL-47907", "details": ["The transfer is an international movement."]}, "documents received": ["seal_number_log_CD-54159.pdf. Seal number log for cross-dock transfer CD-54159, dated 17 May 2026. 1 page. Signed by the depot security officer.", "damaged_goods_exception_sheet_CD-54159.pdf. Damaged goods exception sheet for cross-dock transfer CD-54159, dated 28 May 2026. 1 page. Signed by the warehouse shift supervisor.", "load_consolidation_sheet_CD-54159.pdf. Load consolidation sheet for cross-dock transfer CD-54159, dated 25 April 2026. 2 pages, complete. Signed by the load consolidation planner.", "outbound_loading_record_CD-54159.pdf. Outbound loading record for cross-dock transfer CD-54159, dated 28 May 2026. 1 page. Signed by the outbound loading team lead.", "transfer_manifest_CD-54159.pdf. Transfer manifest for cross-dock transfer CD-54159, dated 13 March 2026. 3 pages, complete. Signed by the transport planner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00108-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Austwald plc", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "11 September 2026"}, "checklist": ["Cancellation policy acceptance, signed.", "Venue access instructions, issued within the last 3 months.", "Prerequisite certificate.", "Employer sponsorship letter, issued within the last 3 months and signed.", "Delegate photo identification, valid (not expired) on the date of the review."], "submission": {"case": {"name": "course booking CV-74926", "reference": "ID-51962"}, "cover note": "Everything needed for course booking CV-74926 is attached and complete.", "documents received": ["payment_confirmation_CV-74926.pdf - Payment confirmation for course booking CV-74926, dated 5 September 2026. It is a single page.", "prerequisite_certificate_CV-74926.pdf - Prerequisite certificate for course booking CV-74926, dated 11 July 2026. It is a single page.", "employer_sponsorship_letter_CV-74926.pdf - Employer sponsorship letter for course booking CV-74926, dated 22 June 2026. It is a single page. It is signed by the employer's human resources manager.", "venue_access_instructions_CV-74926.pdf - Venue access instructions for course booking CV-74926, dated 30 July 2026. It is a single page.", "cancellation_policy_acceptance_CV-74926_v3.pdf - Cancellation policy acceptance for course booking CV-74926, dated 2 September 2026. It is a single page. Its signature line is empty, so it is not signed.", "delegate_photo_identification_CV-74926.pdf - Delegate photo identification for course booking CV-74926, showing an expiry date of 10 December 2026. It is a single page.", "course_booking_form_CV-74926.pdf - Course booking form for course booking CV-74926, dated 5 June 2026. It is 2 pages, complete. It is signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 888}} {"id": "isc-te-00299-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Glenby Ltd", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "16 September 2026"}, "checklist": ["If the employee has caring responsibilities for a dependent, also: caring responsibilities statement (signed)", "client or service impact statement (signed)", "trial period proposal (signed)", "previous flexible working requests record (issued within the last 24 months)", "impact assessment on the team (signed)"], "submission": {"case": {"name": "Siobhan Nebbins", "reference": "XG-87607", "details": ["The employee has caring responsibilities for a dependent."]}, "documents received": ["Line manager opinion note about Siobhan Nebbins. Dated 16 August 2026. 2 pages, complete. Signed by the line manager.", "Impact assessment on the team about Siobhan Nebbins. Dated 9 June 2026. 3 pages, complete. Signed by the line manager.", "Client or service impact statement about Siobhan Nebbins. Dated 26 May 2026. 1 page. Signed by the line manager.", "Trial period proposal about Siobhan Nebbins. Dated 12 July 2026. 1 page. Signed by the line manager.", "Flexible working request form about Siobhan Nebbins. Dated 16 June 2026. 3 pages, complete. Signed by Siobhan Nebbins.", "Previous flexible working requests record about Siobhan Nebbins. Dated 23 August 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 731}} {"id": "isc-te-00002-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Hondford Limited", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "21 May 2026"}, "checklist": ["Firewall change request form, signed.", "Current rule set export, issued within the last 1 month.", "Post-change test plan, signed.", "Peer review checklist, issued within the last 1 month and signed.", "Proposed rule change specification, signed.", "Business justification memo, issued within the last 3 months and signed."], "submission": {"case": {"name": "firewall change DG-58616", "reference": "DU-21666"}, "cover note": "A colleague has already checked this pack before it comes to you. Please carry out your review as normal.", "documents received": ["Business justification memo for change DG-58616. Date of issue: 9 February 2026. Single page. Signed by the requesting business manager.", "Peer review checklist for change DG-58616. Date of issue: 14 May 2026. Single page. Signed by the reviewing peer engineer.", "Risk assessment for change DG-58616. Date of issue: 2 April 2026. 2 pages, complete. Signed by the security analyst.", "Rollback plan for change DG-58616. Date of issue: 30 March 2026. 2 pages, complete. Signed by the operations lead.", "Proposed rule change specification for change DG-58616. Date of issue: 12 February 2026. 2 pages, complete. Signed by the senior firewall engineer.", "Firewall change request form for change DG-58616. Date of issue: 12 April 2026. 3 pages, complete. Signed by the requesting network engineer.", "Current rule set export for change DG-58616. Date of issue: 12 May 2026. 8 pages, complete.", "Post-change test plan for change DG-58616. Date of issue: 27 April 2026. 2 pages, complete. Signed by the test lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 866}} {"id": "isc-te-00392-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Ambstead SAS", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "10 September 2026"}, "checklist": ["Production downtime log, issued within the last 3 months and signed.", "Photographs of the failed component.", "Policy machinery schedule.", "If a temporary machine was hired to keep production going, also: temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Equipment breakdown claim form, signed."], "submission": {"case": {"name": "failed machine VR-6417", "reference": "NN-62631", "details": ["No temporary machine was hired to keep production going."]}, "cover note": "Please accept my apologies for this pack, which was put together in a rush. I would be grateful if you could let me know if anything needs to be clarified. Kind regards, Eoin Zellaker", "documents received": ["Production_downtime_log_VR-6417_17_June_2026.pdf. This production downtime log for failed machine VR-6417 is dated 17 June 2026 and is 2 pages, complete. The log is signed by the production supervisor.", "Engineers_fault_diagnosis_report_VR-6417.pdf. This engineer's fault diagnosis report for failed machine VR-6417 is dated 15 July 2026 and is 4 pages, complete. The report is signed by the diagnosing engineer.", "Production_downtime_log_VR-6417_12_August_2024.pdf. This production downtime log for failed machine VR-6417 is dated 12 August 2026 and is 2 pages, complete. The log is signed by the production supervisor.", "Equipment_breakdown_claim_form_VR-6417.pdf. This equipment breakdown claim form for failed machine VR-6417 is dated 25 May 2026 and is 3 pages, complete. The form is signed by the policyholder.", "Policy_machinery_schedule_VR-6417.pdf. This policy machinery schedule for failed machine VR-6417 is dated 3 July 2026 and runs to 3 pages, complete.", "Photographs_of_failed_component_VR-6417.pdf. These photographs of the failed component of machine VR-6417 are dated 12 July 2026 and come as 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 925}} {"id": "isc-te-00189-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ovarfield GmbH", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "17 June 2026"}, "checklist": ["Costed trip estimate sheet, issued within the last 3 months and signed.", "Travel advance request form, signed.", "Employee bank detail confirmation, issued within the last 6 months and signed.", "Travel policy extract showing advance eligibility.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Trip itinerary and approval, issued within the last 3 months and signed."], "submission": {"case": {"name": "Mert Bramstad", "reference": "VR-72958", "details": ["The requested advance is within the standard advance limit."]}, "documents received": ["VR-72958_d4_travel_policy_extract.pdf. A single-page travel policy extract showing advance eligibility for Mert Bramstad, dated 28 May 2026.", "VR-72958_d1_costed_trip_estimate_sheet.pdf. A single-page costed trip estimate sheet for Mert Bramstad, dated 28 April 2026. It is signed by the employee's line manager.", "VR-72958_d3_employee_bank_detail_confirmation.pdf. A single-page employee bank detail confirmation for Mert Bramstad, dated 29 May 2026. It is signed by the payroll administrator.", "VR-72958_d2_travel_advance_request_form.pdf. A single-page travel advance request form for Mert Bramstad, dated 21 March 2026. It is signed by the employee.", "VR-72958_d5_trip_itinerary_and_approval.pdf. A trip itinerary and approval for Mert Bramstad, dated 8 April 2026, 2 pages, complete. It is signed by the approving manager.", "VR-72958_d7_payroll_deduction_agreement.pdf. A single-page payroll deduction agreement for recovery of the advance for Mert Bramstad, dated 17 March 2026. It is signed by the employee."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and say whether it is complete. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-47", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 851}} {"id": "isc-te-00117-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Istcombe plc", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "27 May 2026"}, "checklist": ["Include a previous grievance outcome letter issued within the last 24 months.", "Include a grievance procedure acknowledgement issued within the last 3 months and signed.", "If the grievance alleges bullying by a named colleague, also include a bullying allegation evidence log, signed.", "Include an evidence bundle index, signed.", "Include a written grievance statement, signed.", "Include a meeting invitation with rights explained issued within the last 1 months.", "Include an adjustment request record issued within the last 3 months and signed."], "submission": {"case": {"name": "Piotr Aldthwaite", "reference": "RG-62178", "details": ["The grievance alleges bullying by a named colleague."]}, "cover note": "Please find everything needed attached and complete for the hearing pack. Rahul Clemnall", "documents received": ["PA-RG-62178-02 grievance procedure acknowledgement.pdf — A grievance procedure acknowledgement concerning Piotr Aldthwaite, dated 4 April 2026. It is a single page and is signed by the HR case handler.", "PA-RG-62178-07 adjustment request record.pdf — An adjustment request record concerning Piotr Aldthwaite, dated 19 March 2026. It is a single page and is signed by the line manager.", "PA-RG-62178-12 previous grievance outcome letter.pdf — A previous grievance outcome letter concerning Piotr Aldthwaite whose date of issue is covered by an ink stamp and cannot be read. 2 pages, complete.", "PA-RG-62178-04 evidence bundle index.pdf — An evidence bundle index concerning Piotr Aldthwaite, dated 5 February 2026. 2 pages, complete, and signed by the case coordinator.", "PA-RG-62178-03 bullying allegation evidence log.pdf — A bullying allegation evidence log concerning Piotr Aldthwaite, dated 2 May 2026. 3 pages, complete, and signed by the investigating officer.", "PA-RG-62178-06 meeting invitation with rights explained.pdf — A meeting invitation with rights explained concerning Piotr Aldthwaite, dated 9 May 2026. It is a single page.", "PA-RG-62178-05 written grievance statement.pdf — A written grievance statement concerning Piotr Aldthwaite, dated 2 April 2026. 3 pages, complete, and signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 966}} {"id": "isc-te-00221-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Uldham BV", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "12 May 2026"}, "checklist": ["Check the asbestos survey is in the pack.", "Check the floor load capacity report is in the pack, signed.", "Check the fire safety certificate is in the pack and valid (not expired) on the date of the review.", "Check the planning permission is in the pack.", "Check the racking inspection report is in the pack, issued within the last 12 months, signed."], "submission": {"case": {"name": "warehouse UO-70250", "reference": "NZ-96154"}, "documents received": ["racking-inspection-report_UO-70250.pdf. A racking inspection report for warehouse UO-70250, dated 9 July 2025, signed by the racking inspector. 2 pages, complete.", "asbestos-survey_UO-70250.pdf. An asbestos survey for warehouse UO-70250, dated 14 February 2026. 5 pages, complete.", "fire-safety-certificate_UO-70250.pdf. A fire safety certificate for warehouse UO-70250, expiring 21 February 2027. 2 pages, complete.", "floor-load-capacity-report_UO-70250.pdf. A floor load capacity report for warehouse UO-70250, dated 26 February 2026, signed by the structural engineer. 3 pages, complete.", "utilities-connection-certificate_UO-70250.pdf. A utilities connection certificate for warehouse UO-70250, dated 13 April 2026. A single page.", "photograph-of-racking_UO-70250.pdf. A photograph of racking for warehouse UO-70250, dated 9 July 2025, with no inspector details, signed by the site manager. 2 pages, complete.", "planning-permission_UO-70250.pdf. A planning permission for warehouse UO-70250, dated 3 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 889}} {"id": "isc-te-00032-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Caelley GmbH", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "3 July 2026"}, "checklist": ["Photographs of the spillage on the floor, issued within the last 1 months.", "Cleaning log for the day of the incident, issued within the last 6 months, signed.", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months, signed.", "Liability claim form, signed.", "Incident report from the day, issued within the last 3 months, signed."], "submission": {"case": {"name": "Elvshaw Ltd", "reference": "YZ-88387", "details": ["The customer has appointed a solicitor for the claim."]}, "documents received": ["Elvshaw_Ltd_liability_claim_form_16_May_2026.pdf. Liability claim form relating to Elvshaw Ltd. Date of issue shown as 16 May 2026. 3 pages, complete. Signed by the customer.", "Elvshaw_Ltd_spillage_floor_photographs_22_June_2026.pdf. Photographs of the spillage on the floor relating to Elvshaw Ltd. Date of issue shown as 22 June 2026. Single page.", "Elvshaw_Ltd_incident_report_28_March_2026.pdf. Incident report from the day relating to Elvshaw Ltd. Date of issue shown as 28 March 2026. 2 pages, complete. Signed by the store manager.", "Elvshaw_Ltd_cleaning_log_24_February_2026.pdf. Cleaning log for the day of the incident relating to Elvshaw Ltd. Date of issue shown as 24 February 2026. Single page. Signed by the duty manager.", "Elvshaw_Ltd_letter_of_claim_31_March_2026.pdf. Letter of claim from the solicitor relating to Elvshaw Ltd. Date of issue shown as 31 March 2026. 3 pages, complete. Signed by the customer's solicitor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 867}} {"id": "isc-te-00403-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Garnmore Ltd", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "18 May 2026"}, "checklist": ["Trade references letter issued within the last 3 months and signed", "Credit limit approval memo issued within the last 1 months and signed", "Personal guarantee signed", "Signed credit terms agreement signed", "Credit reference agency report issued within the last 3 months"], "submission": {"case": {"name": "Kestridge BV", "reference": "FL-14202"}, "documents received": ["Credit reference agency report – Kestridge BV.pdf. Credit reference agency report about Kestridge BV, dated 3 May 2026. 6 pages, complete.", "Credit limit approval memo – Kestridge BV.pdf. Credit limit approval memo about Kestridge BV, dated 8 May 2026. 1 page. Signed by a credit control supervisor.", "Trade references letter – Kestridge BV.pdf. Trade references letter about Kestridge BV, dated 13 March 2026. 1 page. Signed by a credit manager.", "Personal guarantee – Kestridge BV.pdf. Personal guarantee about Kestridge BV, dated 9 May 2026. 2 pages, complete. Signed by a director of Kestridge BV.", "Signed credit terms agreement – Kestridge BV (scan B).pdf. Signed credit terms agreement about Kestridge BV, dated 11 March 2026. 4 pages, complete. The signature line is empty, so it is not signed.", "Company registration certificate – Kestridge BV.pdf. Company registration certificate about Kestridge BV, dated 13 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00104-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Fervford plc", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "25 March 2026"}, "checklist": ["Lost card declaration, signed", "Account statement showing recent activity, issued within the last 1 months", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "Signature verification record, signed", "Delivery address confirmation, signed", "Fraud questionnaire, signed", "Photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Logan Pimberg", "reference": "ZD-97935", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["Card replacement request form - Pimberg ZD-97935.pdf - Card replacement request form concerning Logan Pimberg, dated 17 December 2025. 2 pages, complete. Signed by the cardholder.", "Fraud questionnaire - Pimberg ZD-97935.pdf - Fraud questionnaire concerning Logan Pimberg, dated 12 February 2026. 2 pages, complete. Signed by the cardholder.", "Delivery address confirmation - Pimberg ZD-97935.pdf - Delivery address confirmation concerning Logan Pimberg, dated 21 December 2025. Single page. Signed by the cardholder.", "Signature verification record - Pimberg ZD-97935.pdf - Signature verification record concerning Logan Pimberg, dated 19 February 2026. Single page. Signed by a card services officer.", "Confirmation of contact details - Pimberg ZD-97935.pdf - Confirmation of contact details concerning Logan Pimberg, dated 14 February 2026. Single page.", "Photo identification - Pimberg ZD-97935.pdf - Photo identification concerning Logan Pimberg, showing an expiry date of 10 December 2027. Single page.", "Lost card declaration - Pimberg ZD-97935.pdf - Lost card declaration concerning Logan Pimberg, dated 15 January 2026. Single page. Signed by the cardholder.", "Account statement - Pimberg ZD-97935.pdf - Account statement showing recent activity concerning Logan Pimberg, dated 15 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Step through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete if every applicable line is met (extra documents do not matter). Reply incomplete if at least one applicable line is not met. Reply unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, which may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-27", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 933}} {"id": "isc-te-00445-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vaskburg Partners", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "27 August 2026"}, "checklist": ["If the claim exceeds the limit that requires director sign-off, also: director approval slip (issued within the last 3 months, signed)", "taxi fare receipt (issued within the last 6 months)", "restaurant receipt (issued within the last 6 months)", "train ticket receipt", "conference fee invoice (issued within the last 12 months)", "hotel invoice (issued within the last 6 months)"], "submission": {"case": {"name": "Claire Daskard", "reference": "YL-14076", "details": ["The claim exceeds the limit that requires director sign-off."]}, "documents received": ["Hotel invoice. It concerns Claire Daskard and shows its date of issue as 31 March 2026. It is 2 pages, complete.", "Taxi fare receipt. It concerns Claire Daskard and shows its date of issue as 25 July 2026. It is 1 page.", "Restaurant receipt. It concerns Claire Daskard and shows its date of issue as 19 July 2026. It is 1 page.", "Expense claim form. It concerns Claire Daskard and shows its date of issue as 30 April 2026. It is 2 pages, complete, and carries the signature of the claiming employee.", "Director approval slip. It concerns Claire Daskard and shows its date of issue as 1 July 2026. It is 1 page and carries the signature of the finance director.", "Train ticket receipt. It concerns Claire Daskard and shows its date of issue as 7 July 2026. It is 1 page.", "Conference fee invoice. It concerns Claire Daskard and shows its date of issue as 4 March 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00385-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Cindlund SAS", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "14 May 2026"}, "checklist": ["Flexible working request form, signed", "Trial period proposal, signed", "Line manager opinion note, signed, issued within the last 2 months", "Proposed working pattern plan, signed", "Impact assessment on the team, signed"], "submission": {"case": {"name": "Michael Pimisey", "reference": "TK-36304"}, "cover note": "A colleague has already checked this pack before it was sent. Please review it as normal.", "documents received": ["Impact assessment on the team for Michael Pimisey, dated 1 February 2026, 3 pages, complete, signed by the line manager.", "Line manager opinion note for Michael Pimisey, dated 10 May 2026, 2 pages, complete, signed by the line manager.", "Flexible working request form for Michael Pimisey, dated 22 April 2026, 3 pages, complete, signed by the employee.", "Proposed working pattern plan for Michael Pimisey, dated 27 March 2026, 2 pages, complete, signed by the employee."]}}, "question": {"type": "choice", "instructions": "Determine whether the checklist is fully satisfied by the pack. Go over every checklist line that applies to this case. A required document counts only when it is the kind of document the checklist lists (not merely a similar one), when it is about the case's subject, when it has all its pages, when it is signed wherever the checklist asks for a signature, when it has not expired as of the review date, and when it was issued within the period the checklist allows. Only if its circumstance holds for the case does a conditional line apply. complete: each applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example because a needed date, signature or page count is not visible, because a document's kind cannot be told, or because the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves are what you must judge.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "variant-53", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 687}} {"id": "isc-te-00315-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Haskwell Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "7 September 2026"}, "checklist": ["Obtain a financial stability statement issued within the last 12 months and signed.", "Obtain a supplier capacity declaration issued within the last 12 months and signed.", "Obtain a supplier corrective action plan issued within the last 6 months and signed.", "Obtain a supplier quality questionnaire issued within the last 12 months and signed."], "submission": {"case": {"name": "Nordlock GmbH", "reference": "XW-60086"}, "cover note": "I am not certain that everything needed is in this pack. Please let me know if anything further is required.", "documents received": ["Scanned financial stability statement concerning Nordlock GmbH, dated 12 April 2026. 2 pages, complete. Signed by the supplier's finance director.", "Scanned supplier quality questionnaire concerning Nordlock GmbH, dated 22 May 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Scanned supplier audit report concerning Nordlock GmbH, dated 6 April 2026. 8 pages, complete. Signed by the lead auditor.", "Scanned supplier corrective action plan concerning Nordlock GmbH, dated 23 March 2026. 3 pages, complete. Signed by the supplier's quality manager.", "Scanned supplier capacity declaration concerning Nordlock GmbH, dated 9 August 2026. 2 pages, complete. Signed by the supplier's operations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 725}} {"id": "isc-te-00054-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Hondhurst Inc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "11 March 2026"}, "checklist": ["Flammability test certificate, issued within the last 12 months", "Kit contents list", "Kit cost breakdown, issued within the last 3 months and signed", "If the kit includes an electrical display unit, also: electrical safety test certificate, issued within the last 12 months", "Brand colour specification", "Shipping manifest, issued within the last 1 months", "Waste disposal plan"], "submission": {"case": {"name": "merchandising kit XM-57664", "reference": "OC-82346", "details": ["The kit includes an electrical display unit."]}, "documents received": ["XM-57664 store installation guide.pdf — A store installation guide for merchandising kit XM-57664, dated 6 December 2025. 6 pages, complete.", "XM-57664 electrical safety test certificate.pdf — An electrical safety test certificate for merchandising kit XM-57664, dated 17 January 2026. It is a single page.", "XM-57664 shipping manifest.pdf — A shipping manifest for merchandising kit XM-57664, dated 7 March 2026. 2 pages, complete.", "XM-57664 flammability test certificate.pdf — A flammability test certificate for merchandising kit XM-57664, dated 23 October 2025. It is a single page.", "XM-57664 kit contents list.pdf — A kit contents list for merchandising kit XM-57664, dated 16 November 2025. 2 pages, complete.", "XM-57664 waste disposal plan.pdf — A waste disposal plan for merchandising kit XM-57664, dated 23 January 2026. It is a single page.", "XM-57664 brand colour specification.pdf — A brand colour specification for merchandising kit XM-57664, dated 14 December 2025. It is a single page.", "XM-57664 kit cost breakdown.pdf — A kit cost breakdown for merchandising kit XM-57664, dated 2 February 2026. 2 pages, complete. It is signed by the finance manager."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack is complete per the checklist. Go over every checklist line that applies to this case. Only a document of the listed kind counts (not a similar one), and it must be about the case's subject, have all its pages, be signed wherever the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: at least one applicable line is not satisfied. unclear: no line is clearly not met, but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-9", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 943}} {"id": "isc-te-00249-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Wilmwood Inc", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "13 May 2026"}, "checklist": ["If the adult owns property that could be considered in the financial assessment, also: property valuation report (issued within the last 12 months, signed)", "needs assessment report (signed)", "recent bank statements (issued within the last 3 months)", "support plan (signed)", "proof of identity (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Rhys Lamnall", "reference": "CN-53168", "details": ["The adult owns property that could be considered in the financial assessment."]}, "documents received": ["proof of identity.pdf — A proof of identity about Rhys Lamnall, showing an expiry date of 20 April 2027. It is a single page.", "financial assessment form.pdf — A financial assessment form about Rhys Lamnall, dated 5 April 2026. It has 6 pages, complete. It is signed by a financial assessment officer.", "support plan.pdf — A support plan about Rhys Lamnall, dated 25 February 2026. It has 6 pages, complete. It is signed by a social worker.", "recent bank statements.pdf — Recent bank statements about Rhys Lamnall, dated 10 April 2026. It has 8 pages, complete.", "needs assessment report.pdf — A needs assessment report about Rhys Lamnall, dated 24 March 2026. It has 12 pages, complete. It is signed by a social worker."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 753}} {"id": "isc-te-00380-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Weskthorpe LLP", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "18 May 2026"}, "checklist": ["Plant room access sign-in sheet.", "Asset condition photograph sheet, issued within the last 1 months.", "If the system contains more than 5 tonnes of refrigerant, also: fixed leak detection test certificate, issued within the last 6 months, signed.", "Refrigerant top-up log, issued within the last 1 months, signed.", "System pressure test results, issued within the last 1 months, signed."], "submission": {"case": {"name": "air conditioning system SP-87357", "reference": "XS-20787", "details": ["The system contains 5 tonnes of refrigerant or less."]}, "cover note": "Please find attached everything needed for this service pack, all complete. Let me know if anything else is required.", "documents received": ["Plant room access sign-in sheet for air conditioning system SP-87357. Dated 24 April 2026. 1 page.", "Asset condition photograph sheet for air conditioning system SP-87357. Dated 9 May 2026. 2 pages, complete.", "System pressure test results for air conditioning system SP-87357. Dated 8 May 2026. 2 pages, complete. Signed by the commissioning engineer.", "Engineer's service report for air conditioning system SP-87357. Dated 15 May 2026. 3 pages, complete. Signed by the service engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 746}} {"id": "isc-te-00487-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Heskness & Co", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "11 August 2026"}, "checklist": ["If the tenant is a newly formed company, also include: signed parent company guarantee (signed)", "If the lease term is longer than seven years, also include: land registration application (signed)", "Check that the keys handover receipt is signed", "Check that the title information document is present", "Check that the signed draft lease is signed", "Check that the stamp duty return is signed", "Check that the asbestos survey report was issued within the last 12 months"], "submission": {"case": {"name": "premises PF-67086", "reference": "NG-35657", "details": ["The tenant is a newly formed company.", "The lease term is longer than seven years."]}, "documents received": ["Stamp_Duty_Return_PF-67086.pdf - Stamp duty return for premises PF-67086, dated 15 April 2026. 2 pages, complete. Signed by the tenant's accountant.", "Keys_Handover_Receipt_PF-67086.pdf - Keys handover receipt for premises PF-67086, dated 12 June 2026. Single page. Signed by the landlord's agent.", "Asbestos_Survey_Report_PF-67086_20250821.pdf - Asbestos survey report for premises PF-67086, issued on 21 August 2025. 4 pages, complete.", "Signed_Draft_Lease_PF-67086.pdf - Signed draft lease for premises PF-67086, dated 10 June 2026. 12 pages, complete. Signed by the landlord and the tenant.", "Energy_Performance_Certificate_PF-67086.pdf - Energy performance certificate for premises PF-67086, expiring on 31 January 2028. Single page.", "Title_Information_Document_PF-67086.pdf - Title information document for premises PF-67086, dated 11 June 2026. 3 pages, complete.", "Parent_Company_Guarantee_PF-67086.pdf - Signed parent company guarantee for premises PF-67086, dated 8 June 2026. 3 pages, complete. Signed by a director of the parent company.", "Guarantor_Consent_Letter_PF-67086.pdf - Guarantor consent letter for premises PF-67086, dated 4 June 2026. Single page. Signed by the guarantor.", "Land_Registration_Application_PF-67086.pdf - Land registration application for premises PF-67086, dated 17 June 2026. 2 pages, complete. Signed by the applicant's solicitor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1034}} {"id": "isc-te-00278-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Wendwyn Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "7 September 2026"}, "checklist": ["Sales invoice or receipt for the sale proceeds, issued within the last 3 months.", "Signed asset disposal request form.", "Signed board or budget holder approval for the disposal.", "Signed asset de-registration and tag removal record."], "submission": {"case": {"name": "disposed asset FF-78187", "reference": "WP-26906"}, "documents received": ["Fixed asset register extract for the asset - FF-78187 - 8 July 2026. A single-page fixed asset register extract for the asset FF-78187, dated 8 July 2026.", "Asset de-registration and tag removal record - FF-78187 - 12 August 2026. A single-page asset de-registration and tag removal record for disposed asset FF-78187, dated 12 August 2026. A sticky note covers the signature block, so it cannot be seen whether the record is signed.", "Asset disposal request form - FF-78187 - 22 July 2026. 2 pages, complete. The asset disposal request form for disposed asset FF-78187, dated 22 July 2026, signed by the requesting budget holder.", "Sales invoice for sale proceeds - FF-78187 - 27 July 2026. A single-page sales invoice or receipt for the sale proceeds relating to disposed asset FF-78187, dated 27 July 2026.", "Board or budget holder approval for the disposal - FF-78187 - 17 May 2026. A single-page board or budget holder approval for the disposal of asset FF-78187, dated 17 May 2026, signed by a director on behalf of the board.", "Depreciation schedule for the asset to date - FF-78187 - 29 August 2026. 2 pages, complete. The depreciation schedule for the asset to date for disposed asset FF-78187, dated 29 August 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 890}} {"id": "isc-te-00254-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Elvwater BV", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 June 2026"}, "checklist": ["Annual activity report, issued within the last 6 months, signed.", "If the institute received industry funding above the university's disclosure threshold, also: industry funding disclosure statement, issued within the last 12 months, signed.", "Staffing plan, issued within the last 6 months, signed.", "Financial expenditure summary, issued within the last 3 months, signed.", "Doctoral researcher progress summary, issued within the last 6 months, signed.", "Intellectual property register extract, issued within the last 6 months, signed.", "Director's declaration of interests, issued within the last 12 months, signed."], "submission": {"case": {"name": "Wendmere Inc", "reference": "GI-71566", "details": ["The institute received industry funding above the university's disclosure threshold."]}, "cover note": "Everything needed for this review is attached and complete, so it is ready for your consideration.", "documents received": ["Wendmere Inc annual activity report.pdf - An annual activity report for Wendmere Inc, dated 2 April 2026. It has 12 pages, complete, and is signed by the institute director.", "Wendmere Inc staffing plan.pdf - A staffing plan for Wendmere Inc, dated 3 April 2026. It has 2 pages, complete, and is signed by the institute director.", "Wendmere Inc financial expenditure summary.pdf - A financial expenditure summary for Wendmere Inc, dated 16 April 2026. It has 3 pages, complete, and is signed by the institute finance officer.", "Wendmere Inc doctoral researcher progress summary.pdf - A doctoral researcher progress summary for Wendmere Inc, dated 22 January 2026. It has 2 pages, complete, and is signed by the doctoral programme coordinator.", "Wendmere Inc director's declaration of interests.pdf - A director's declaration of interests for Wendmere Inc, dated 28 February 2026. It is a single page and is signed by the institute director.", "Wendmere Inc intellectual property register extract.pdf - An intellectual property register extract for Wendmere Inc, dated 11 February 2026. It is a single page and is signed by the head of technology transfer."]}}, "question": {"type": "choice", "instructions": "You must judge if the pack is complete relative to the checklist. Review each line of the checklist that has relevance to this case. To count, a required document must match the kind of document the checklist specifies (a similar one will not do), must relate to the subject of the case, must include all its pages, must be signed wherever the checklist calls for a signature, must still be valid on the review date (that is, not expired), and must have been issued during the period the checklist permits. A conditional line binds the case only if the circumstance it describes actually holds. complete: all applicable lines are satisfied, and extra documents are of no consequence. incomplete: at least one applicable line fails. unclear: no line fails outright, but at least one cannot be decided on the basis of what is displayed, for example a necessary date, signature or page count is not visible, the kind of a document cannot be told, or the case details are silent on whether a conditional line's circumstance holds while that line's document is missing. Do not rely on cover notes or labels, which may mislead; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-52", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 935}} {"id": "isc-te-00060-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Glengard Group", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "3 April 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed", "Certificate of insurance, valid (not expired) on the date of the review", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid (not expired) on the date of the review", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed", "Supplier registration form, signed", "Anti-bribery policy statement, signed", "Certificate of incorporation", "Supplier declaration of no conflicts of interest, signed"], "submission": {"case": {"name": "Austwyn Limited", "reference": "LU-89623", "details": ["The supplier is a small business with a single owner.", "The supplier is a domestic company."]}, "cover note": "Please let me know if anything further is needed from my side.", "documents received": ["Bank details confirmation letter for Austwyn Limited. Dated 21 March 2026, 1 page, signed by the supplier's finance manager.", "Certificate of incorporation for Austwyn keep name consistent: Austwyn Limited. Dated 7 January 2026, 2 pages, complete.", "Company tax clearance certificate for Austwyn Limited. Shows an expiry date of 3 February 2028, 1 page.", "Anti-bribery policy statement for Austwyn Limited. Dated 11 January 2026, 2 pages, complete, signed by the supplier's managing director.", "Certificate of insurance for Austwyn Limited. Shows an expiry date of 5 July 2028, 2 pages, complete.", "Signed copy of the general terms and conditions for Austwyn Limited. Dated 8 March 2026, 6 pages, complete, signed by the supplier's managing director.", "Supplier declaration of no conflicts of interest for Austwyn Limited. Dated 27 March 2026, 1 page, signed by the supplier's managing director.", "Copy of the owner's photo identification for Austwyn Limited. Shows an expiry date of 28 May 2027, 1 page.", "Supplier registration form for Austwyn Limited. Dated 8 January 2026, 3 pages, complete, signed by the supplier's managing director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 917}} {"id": "isc-te-00084-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Stervfeld GmbH", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "10 September 2026"}, "checklist": ["If the design changes how customer data is stored, also: data protection review sign-off (signed)", "review board feedback summary (issued within the last 3 months, signed)", "proposed architecture diagram", "problem statement page", "cost estimate sheet (issued within the last 6 months)", "security threat model (issued within the last 6 months)"], "submission": {"case": {"name": "design document AE-97456", "reference": "UG-66655", "details": ["The design changes how customer data is stored."]}, "documents received": ["Problem statement page for design document AE-97456. Date of issue: 7 August 2026. 2 pages, complete.", "Capacity and load estimate for design document AE-97456. Date of issue: 13 April 2026. 3 pages, complete.", "Security threat model for design document AE-97456. Date of issue: 7 June 2026. 4 pages, complete.", "Cost estimate sheet for design document AE-97456. Date of issue: 30 August 2026. 2 pages, complete.", "Review board feedback summary for design document AE-97456. Date of issue: 3 August 2026. 2 pages, complete. Signed by the review board chair.", "Proposed architecture diagram for design document AE-97456. Date of issue: 18 August 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00025-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Dravside Group", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "16 September 2026"}, "checklist": ["Previous grievance outcome letter, issued within the last 24 months.", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed.", "Witness list, signed.", "Evidence bundle index, signed.", "Investigator appointment letter, issued within the last 3 months."], "submission": {"case": {"name": "Carmen Daskow", "reference": "VR-41263", "details": ["The grievance is not against the employee's direct manager."]}, "cover note": "Everything needed for this pack is attached and complete.", "documents received": ["VR-41263 investigator appointment letter - Carmen Daskow.pdf. Investigator appointment letter about Carmen Daskow, dated 12 July 2026. A single page.", "VR-41263 witness list - Carmen Daskow.pdf. Witness list about Carmen Daskow, dated 3 July 2026. A single page, signed by the case handler.", "VR-41263 previous grievance outcome letter - Carmen Daskow.pdf. Previous grievance outcome letter about Carmen Daskow, dated 16 January 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Does the pack measure up to the checklist? Examine every checklist line that applies here. A required document only counts if it is the kind of document listed (not a similar one), relates to the subject of the case, contains all its pages, carries a signature wherever the checklist asks for one, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Use complete if every applicable line is met (extra documents do not matter). Use incomplete if at least one applicable line is not met. Use unclear if no line is clearly unmet but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 3, "verified": true, "misleading_cue": true, "instructions": "variant-23", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 687}} {"id": "isc-te-00487-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Heskness & Co", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "11 August 2026"}, "checklist": ["If the tenant is a newly formed company, also include: signed parent company guarantee (signed)", "If the lease term is longer than seven years, also include: land registration application (signed)", "Check that the keys handover receipt is signed", "Check that the title information document is present", "Check that the signed draft lease is signed", "Check that the stamp duty return is signed", "Check that the asbestos survey report was issued within the last 12 months"], "submission": {"case": {"name": "premises PF-67086", "reference": "NG-35657", "details": ["The tenant is a newly formed company.", "The lease term is longer than seven years."]}, "documents received": ["Land_Registration_Application_PF-67086.pdf - Land registration application for premises PF-67086, dated 17 June 2026. 2 pages, complete. Signed by the applicant's solicitor.", "Title_Information_Document_PF-67086.pdf - Title information document for premises PF-67086, dated 11 June 2026. 3 pages, complete.", "Guarantor_Consent_Letter_PF-67086.pdf - Guarantor consent letter for premises PF-67086, dated 4 June 2026. Single page. Signed by the guarantor.", "Signed_Draft_Lease_PF-67086.pdf - Signed draft lease for premises PF-67086, dated 10 June 2026. 12 pages, complete. Signed by the landlord and the tenant.", "Stamp_Duty_Return_PF-67086.pdf - Stamp duty return for premises PF-67086, dated 15 April 2026. 2 pages, complete. Signed by the tenant's accountant.", "Parent_Company_Guarantee_PF-67086.pdf - Signed parent company guarantee for premises PF-67086, dated 8 June 2026. 3 pages, complete. Signed by a director of the parent company.", "File_011.pdf - The contents of this file cannot be seen, as the scan is blank.", "Asbestos_Survey_Report_PF-67086_20250825.pdf - Asbestos survey report for premises PF-67086, issued on 25 August 2025. 4 pages, complete.", "Keys_Handover_Receipt_PF-67086.pdf - Keys handover receipt for premises PF-67086, dated 12 June 2026. Single page. Signed by the landlord's agent."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 7, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1013}} {"id": "isc-te-00207-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Crancombe Inc", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "4 August 2026"}, "checklist": ["Leave balance statement, issued within the last 3 months", "If the leave requested is longer than two weeks, also: extended absence cover plan (signed)", "Handover note (signed)", "Team holiday planner extract", "Contact plan for time away", "Return to work date confirmation", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave (signed)"], "submission": {"case": {"name": "Femke Grubwick", "reference": "MF-51224", "details": ["The leave requested is longer than two weeks.", "The employee is requesting leave during a known busy period."]}, "documents received": ["handover_note_MF-51224.pdf. Handover note for Femke Grubwick, dated 23 July 2026. 2 pages, complete; signed by the line manager.", "return_to_work_date_confirmation_MF-51224.pdf. Return to work date confirmation for Femke Grubwick, dated 4 May 2026. 1 page.", "leave_balance_statement_MF-51224_v4.pdf. Leave balance statement for Femke Grubwick; the date of issue is smudged and cannot be read. 1 page.", "business_case_for_peak_period_leave_MF-51224.pdf. Business case for peak-period leave for Femke Grubwick, dated 13 May 2026. 2 pages, complete; signed by the line manager.", "contact_plan_for_time_away_MF-51224.pdf. Contact plan for time away for Femke Grubwick, dated 27 June 2026. 1 page.", "extended_absence_cover_plan_MF-51224.pdf. Extended absence cover plan for Femke Grubwick, dated 16 July 2026. 3 pages, complete; signed by the line manager.", "team_holiday_planner_extract_MF-51224.pdf. Team holiday planner extract for Femke Grubwick, dated 8 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 694}} {"id": "isc-te-00015-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Ambford Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "15 May 2026"}, "checklist": ["Cancellation policy acceptance, signed", "Employer sponsorship letter, issued within the last 3 months, signed", "Special requirements note", "Venue access instructions, issued within the last 3 months", "Prerequisite certificate"], "submission": {"case": {"name": "course booking WJ-95480", "reference": "PQ-38702"}, "documents received": ["venue-access-instructions-WJ-95480.pdf. Venue access instructions for course booking WJ-95480, issued on 6 April 2026. It is 1 page.", "cancellation-policy-acceptance-WJ-95480.pdf. A cancellation policy acceptance for course booking WJ-95480, issued on 2 February 2026. It is 1 page and signed by the delegate.", "special-requirements-note-WJ-95480.pdf. A special requirements note for course booking WJ-95480, issued on 3 February 2026. It is 1 page.", "prerequisite-certificate-WJ-95480.pdf. A prerequisite certificate for course booking WJ-95480, issued on 18 January 2026. It is 1 page.", "employer-sponsorship-letter-WJ-95480.pdf. An employer sponsorship letter for course booking WJ-95480, issued on 2 March 2026. It is 1 page and signed by the employer's human resources manager.", "delegate-photo-identification-WJ-95480.pdf. Delegate photo identification for course booking WJ-95480, with an expiry date of 22 February 2028. It is 1 page."]}}, "question": {"type": "choice", "instructions": "The decision to make is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves, not the notes.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-43", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 817}} {"id": "isc-te-00179-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Corvmark Group", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "10 July 2026"}, "checklist": ["Booking voucher, issued within the last 6 months.", "Fuel policy sheet, signed.", "If the named driver is under 25 years old, also: young driver surcharge agreement, signed.", "Driving licence, valid (not expired) on the date of the review, signed.", "Credit card in the driver's name, valid (not expired) on the date of the review, signed.", "Vehicle condition report, signed."], "submission": {"case": {"name": "Rachel Wraxstow", "reference": "FI-32246", "details": ["The named driver is under 25 years old."]}, "documents received": ["Booking voucher for Rachel Wraxstow, dated 8 May 2026. Single page.", "Credit card in the driver's name for Rachel Wraxstow, expiry date 7 September 2027. Signed by Rachel Wraxstow. Single page.", "Driving licence for Rachel Wraxstow, expiry date 5 September 2027. 2 pages, complete. Signed by Rachel Wraxstow.", "Vehicle condition report for Rachel Wraxstow, dated 21 May 2026. 2 pages, complete. Signed by Rachel Wraxstow.", "Fuel policy sheet for Rachel Wraxstow, dated 15 April 2026. Signed by Rachel Wraxstow. Single page."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete when checked against the checklist. Go through each line of the checklist that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-10", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 730}} {"id": "isc-te-00290-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Raskmore plc", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "17 March 2026"}, "checklist": ["Photographs of the fault, issued within the last 3 months", "Cost estimate, issued within the last 3 months, signed", "Job request form, signed", "Planned completion date sheet, signed", "Location details sheet"], "submission": {"case": {"name": "maintenance request IW-1228", "reference": "EG-89517"}, "documents received": ["Job request form. The form concerns maintenance request IW-1228 and shows a date of issue of 13 February 2026. 1 page. It is signed by the requesting manager.", "Planned completion date sheet. The sheet concerns maintenance request IW-1228 and shows a date of issue of 23 December 2025. 1 page. It is signed by the facilities coordinator.", "Location details sheet. The sheet concerns maintenance request IW-1228 and shows a date of issue of 12 January 2026. 1 page.", "Access authorisation slip. The slip concerns maintenance request IW-1228 and shows a date of issue of 31 December 2025. 1 page. It is signed by the site security officer.", "Photographs of the fault. The photographs concern maintenance request IW-1228 and show a date of issue of 2 March 2026. 2 pages, complete.", "Cost estimate. The estimate concerns maintenance request IW-1228 and shows a date of issue of 22 February 2026. 2 pages, complete. It is signed by the estimator."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide. Review each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Give complete if every applicable line is met (extra documents do not matter). Give incomplete if at least one applicable line is not met. Give unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-25", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 773}} {"id": "isc-te-00384-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Jundburg Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "8 June 2026"}, "checklist": ["Confirm the pack contains the plant room access sign-in sheet.", "Confirm the pack contains the thermostat calibration certificate, issued within the last 12 months.", "Confirm the pack contains the engineer F-gas handling certificate, valid (not expired) on the date of the review.", "Confirm the pack contains the F-gas leak check record, issued within the last 12 months and signed.", "Confirm the pack contains the refrigerant top-up log, issued within the last 1 months and signed.", "Confirm the pack contains the system pressure test results, issued within the last 1 months and signed.", "If refrigerant was added during the service, also confirm the pack contains the refrigerant recovery note, issued within the last 1 months and signed."], "submission": {"case": {"name": "air conditioning system QA-33718", "reference": "FF-66011", "details": ["No refrigerant was added during the service."]}, "documents received": ["Plant room access sign-in sheet for air conditioning system QA-33718, dated 4 April 2026. 1 page.", "Refrigerant top-up log for air conditioning system QA-33718, dated 31 May 2026. 1 page. Signed by the servicing engineer.", "F-gas leak check record for air conditioning system QA-33718, dated 5 October 2025. 2 pages, complete. Signed by the servicing engineer.", "Thermostat calibration certificate for air conditioning system QA-33718, dated 10 January 2026. 1 page.", "System pressure test results for air conditioning system QA-33718, dated 26 May 2026. 2 pages, complete. Signed by the servicing engineer.", "Engineer F-gas handling certificate for air conditioning system QA-33718, showing an expiry date of 1 November 2028. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 853}} {"id": "isc-te-00142-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Maldwick Limited", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "25 March 2026"}, "checklist": ["Two-factor authentication confirmation, issued within the last 3 months.", "Content escalation route, signed.", "Account purpose statement.", "Platform terms acceptance record, signed.", "Naming convention approval, signed."], "submission": {"case": {"name": "new social media account YK-40400", "reference": "WH-23864"}, "cover note": "Please could you approve this pack as soon as possible, as all the paperwork is in order. Thank you, Kayla Mabford.", "documents received": ["YK-40400_admin_access_list.pdf. An admin access list for new social media account YK-40400, dated 21 March 2026. It is a single page.", "YK-40400_naming_convention_approval.pdf. A naming convention approval for new social media account YK-40400, dated 30 December 2025. This single page is signed by the social media manager.", "YK-40400_platform_terms_acceptance_record.pdf. A platform terms acceptance record for new social media account YK-40400, dated 16 March 2026. This single page is signed by the social media manager.", "YK-40400_account_closure_procedure.pdf. An account closure procedure for new social media account YK-40400, dated 28 November 2025. It is a single page.", "YK-40400_content_escalation_route.pdf. A content escalation route for new social media account YK-40400, dated 7 December 2025. This single page is signed by the social media manager.", "YK-40400_account_purpose_statement.pdf. An account purpose statement for new social media account YK-40400, dated 2 January 2026. It is a single page.", "YK-40400_document_3.pdf. A two-factor authentication confirmation for new social media account YK-40400, dated 16 December 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "The question to answer is whether the pack stands complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-63", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 903}} {"id": "isc-te-00328-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Ebrmont BV", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "30 April 2026"}, "checklist": ["Three most recent payslips, issued within the last 3 months.", "Passport, valid (not expired) on the date of the review.", "Three months of bank statements, issued within the last 3 months.", "Gifted deposit letter, issued within the last 3 months and signed.", "Property valuation report, issued within the last 3 months and signed."], "submission": {"case": {"name": "Jonas Radton", "reference": "OO-69836"}, "documents received": ["Gifted deposit letter for Jonas Radton, dated 16 April 2026. 1 page, signed by the donor of the gift.", "Three months of bank statements for Jonas Radton, issued on 24 February 2026. 9 pages, complete.", "Three most recent payslips for Jonas Radton, dated 2 March 2026. 3 pages, complete.", "Passport for Jonas Radton, showing an expiry date of 31 August 2027. 2 pages, complete.", "Property valuation report for Jonas Radton, dated 26 March 2026. 8 pages, complete. The signature area is obscured by a sticky note, so it is not known whether the report is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 689}} {"id": "isc-te-00149-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Xanheim GmbH", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "7 May 2026"}, "checklist": ["Pension contribution certificate, issued within the last 13 months", "Rental income record", "Employment income summary, issued within the last 13 months", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Bank interest statement, issued within the last 13 months"], "submission": {"case": {"name": "household tax affairs WG-34056", "reference": "EP-63392", "details": ["The household sold a property other than its main home during the tax year."]}, "documents received": ["Pension contribution certificate.pdf - Pension contribution certificate for household tax affairs WG-34056. Its date of issue is 21 June 2025. 2 pages, complete.", "Bank interest statement.pdf - Bank interest statement for household tax affairs WG-34056. Its date of issue is 30 April 2025. 3 pages, complete.", "Employment income summary.pdf - Employment income summary for household tax affairs WG-34056. Its date of issue is 18 August 2025. 2 pages, complete.", "Childcare payment receipt.pdf - Childcare payment receipt for household tax affairs WG-34056. Its date of issue is 13 March 2026. 1 page.", "Capital gains asset record.pdf - Capital gains asset record for household tax affairs WG-34056. Its date of issue is 8 February 2026. 2 pages, complete.", "Rental income record.pdf - Rental income record for household tax affairs WG-34056. Its date of issue is 27 January 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 810}} {"id": "isc-te-00091-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Stervside plc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "3 August 2026"}, "checklist": ["Shared mailbox handover record, issued within the last 1 months and signed", "Leaver notification form, signed", "Service desk ticket closure summary, issued within the last 1 months", "Access rights inventory, issued within the last 1 months", "Non-disclosure reminder acknowledgement, signed"], "submission": {"case": {"name": "Siobhan Foskthwaite", "reference": "HW-35438"}, "documents received": ["leaver_notification_form_HW-35438.pdf — Leaver notification form for Siobhan Foskthwaite. Dated 27 April 2026. 2 pages, complete, signed by the line manager.", "shared_mailbox_handover_record_HW-35438.pdf — Shared mailbox handover record for Siobhan Foskthwaite. Dated 20 July 2026. 2 pages, complete, signed by the departing employee.", "service_desk_ticket_closure_summary_HW-35438.pdf — Service desk ticket closure summary for Siobhan Foskthwaite. Dated 22 July 2026. 3 pages, complete.", "access_rights_inventory_HW-35438.pdf — Access rights inventory for Siobhan Foskthwaite. Dated 20 July 2026. 4 pages, complete.", "non_disclosure_reminder_acknowledgement_HW-35438.pdf — Non-disclosure reminder acknowledgement for Siobhan Foskthwaite. Dated 9 July 2026. Single page, signed by the departing employee.", "line_manager_confirmation_HW-35438.pdf — Line manager confirmation for Siobhan Foskthwaite. Dated 28 July 2026. Single page, signed by the line manager.", "software_titles_list_HW-35438.pdf — List of software titles the company owns, relating to Siobhan Foskthwaite. Dated 20 July 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 869}} {"id": "isc-te-00090-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Uldvale LLP", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "27 April 2026"}, "checklist": ["Asset register update, issued within the last 1 months.", "Decommission request form, signed.", "Final backup confirmation, issued within the last 3 months, signed.", "Data migration confirmation, issued within the last 3 months, signed.", "Dependent systems check report, issued within the last 3 months.", "Licence reassignment note, issued within the last 3 months, signed.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server HC-85039", "reference": "XH-31889", "details": ["The server holds archived records that must be kept."]}, "cover note": "This pack has already been checked by a colleague before it reached you. Please treat it as reviewed and pass it on as it stands.", "documents received": ["Decommission request form for retired server HC-85039, dated 5 January 2026. 2 pages, complete. Signed by the infrastructure operations team lead.", "Data wipe certificate for retired server HC-85039, dated 9 February 2026. Single page. Signed by the data sanitisation technician.", "Archive retention confirmation for retired server HC-85039, dated 28 March 2026. 2 pages, complete. Signed by the records manager.", "Data migration confirmation for retired server HC-85039, dated 25 March 2026. 2 pages, complete. Signed by the systems migration lead.", "Dependent systems check report for retired server HC-85039, dated 21 March 2026. 3 pages, complete.", "Asset register update for retired server HC-85039, dated 15 April 2026. Single page.", "Final backup confirmation for retired server HC-85039, dated 26 March 2026. Single page. Signed by the backup administrator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00150-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jarlmouth LLP", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "17 June 2026"}, "checklist": ["If the supplier is a foreign company, also: certified translation of the certificate of incorporation (signed)", "Certificate of incorporation", "Supplier declaration of no conflicts of interest (signed)", "Bank details confirmation letter (issued within the last 3 months, signed)", "Supplier registration form (signed)"], "submission": {"case": {"name": "Xanhall Inc", "reference": "EC-70750", "details": ["The supplier is a domestic company."]}, "documents received": ["Certificate of incorporation for Xanhall Inc, issued 19 February 2026. 2 pages, complete.", "Bank details confirmation letter for Xanhall Inc, issued 5 May 2026. Single page, signed by a bank officer.", "Supplier declaration of no conflicts of interest for Xanhall Inc, dated 18 May 2026. Single page, signed by a company director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 612}} {"id": "isc-te-00168-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Esklock Group", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "9 April 2026"}, "checklist": ["Go-live sign-off certificate, issued within the last 1 months, signed.", "Payment gateway technical specification.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review.", "Penetration test summary, issued within the last 6 months, signed.", "Fraud screening configuration sheet, signed."], "submission": {"case": {"name": "payment gateway UC-28398", "reference": "VH-98812", "details": ["The gateway will store customers' card details."]}, "cover note": "All the paperwork is in order, so I would appreciate a quick approval on this one. Please come back to me as soon as you can.", "documents received": ["Card storage compliance certificate for payment gateway UC-28398. Expiry date: 17 July 2027. 2 pages, complete.", "Penetration test summary for payment gateway UC-28398. Date of issue: 28 December 2025. 3 pages, complete. Signed by the IT Security Test Lead.", "Fraud screening configuration sheet for payment gateway UC-28398. Date of issue: 28 December 2025. 1 page, signed by the Fraud Screening Analyst.", "Payment gateway technical specification for payment gateway UC-28398. Date of issue: 27 March 2026. Pages 1 to 7 are included; the total number of pages is not shown anywhere.", "Go-live sign-off certificate for payment gateway UC-28398. Date of issue: 5 April 2026. 1 page, signed by the Head of Payments Operations."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack matches the checklist. Take each checklist line that applies to this case in turn. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete: every applicable line is met (extra documents do not matter). Choose incomplete: at least one applicable line is not met. Choose unclear: no line is clearly unmet, but at least one cannot be decide from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-20", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 802}} {"id": "isc-te-00244-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Elstley plc", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 June 2026"}, "checklist": ["Travel request form, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Travel policy acknowledgement, signed.", "Hotel booking confirmation.", "Passport copy for international travel, valid (not expired) on the date of the review."], "submission": {"case": {"name": "business trip CM-86741", "reference": "KC-24296", "details": ["The trip involves no country requiring a visa."]}, "documents received": ["CM-86741_travel_request_form.pdf. Travel request form for business trip CM-86741, issued 3 May 2026. Signed by the traveller, 2 pages, complete.", "CM-86741_hotel_booking_confirmation.pdf. Hotel booking confirmation for business trip CM-86741, issued 28 February 2026, 2 pages, complete.", "CM-86741_passport_copy.pdf. Passport copy for international travel for business trip CM-86741, single page. The passport expires 10 December 2028.", "CM-86741_travel_policy_acknowledgement.pdf. Travel policy acknowledgement for business trip CM-86741, issued 21 May 2026. Signed by the traveller, single page.", "File_0092.pdf. The file will not open, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 733}} {"id": "isc-te-00369-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Iskmark GmbH", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "7 September 2026"}, "checklist": ["Confirm the pack contains a travel policy extract showing advance eligibility.", "Confirm the pack contains a payroll deduction agreement for recovery of the advance, signed.", "Confirm the pack contains an outstanding advance clearance check, signed.", "Confirm the pack contains a costed trip estimate sheet, signed and issued within the last 3 months.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Confirm the pack contains a travel advance request form, signed."], "submission": {"case": {"name": "Matteo Mundham", "reference": "VW-11525", "details": ["The requested advance is within the standard advance limit."]}, "documents received": ["Travel policy extract showing advance eligibility. Issued 30 June 2026, 1 page. The extract shows that Matteo Mundham is eligible for a travel advance.", "File 04.pdf. The file will not open, so its contents cannot be seen.", "Costed trip estimate sheet. Issued 4 August 2026, 1 page. Signed by Matteo Mundham, listing the estimated costs for the trip.", "Travel advance request form. Issued 2 August 2026, 1 page. Signed by Matteo Mundham, requesting the travel advance.", "Outstanding advance clearance check. Issued 19 August 2026, 1 page. Signed by the payroll administrator, confirming the check on outstanding advances for Matteo Mundham.", "Trip itinerary and approval. Issued 22 August 2026, 2 pages, complete. Signed by the line manager, approving the itinerary for Matteo Mundham's trip.", "Payroll deduction agreement for recovery of the advance. Issued 25 August 2026, 1 page. Signed by Matteo Mundham, agreeing that the advance will be recovered from pay."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 815}} {"id": "isc-te-00484-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Mersmore LLP", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "7 September 2026"}, "checklist": ["CCTV footage stills of the incident, issued within the last 3 months", "staff training record for the duty manager, issued within the last 24 months, signed", "incident report from the day, issued within the last 3 months, signed", "photographs of the spillage on the floor, issued within the last 1 months", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months, signed", "witness statement from a staff member, signed"], "submission": {"case": {"name": "Elstvale Limited", "reference": "HM-93904", "details": ["The customer has appointed a solicitor for the claim."]}, "documents received": ["Photographs of the spillage on the floor relating to Elstvale Limited, dated 20 August 2026. 1 page.", "CCTV footage stills of the incident relating to Elstvale Limited, dated 17 July 2026. 2 pages, complete.", "Letter of claim from the solicitor relating to Elstvale Limited, dated 30 April 2026. 3 pages, complete. Signed by the solicitor.", "Incident report from the day relating to Elstvale Limited, dated 15 August 2026. 2 pages, complete. Signed by the duty manager.", "Public liability insurance schedule relating to Elstvale Limited, dated 7 June 2026. 4 pages, complete.", "Staff training record for the duty manager relating to Elstvale Limited, dated 11 November 2025. 2 pages, complete. Signed by the training manager.", "Witness statement from a staff member relating to Elstvale Limited, dated 11 June 2026. 1 page. Signed by the staff member."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00033-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Wendstead Limited", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "23 June 2026"}, "checklist": ["Loss adjuster's inspection report, issued within the last 6 months and signed", "Council flood warning notice, issued within the last 12 months", "Flood claim form, signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months"], "submission": {"case": {"name": "property SP-19466", "reference": "IK-48540"}, "documents received": ["utility_supplier_letter_SP-19466.pdf - Utility supplier's letter confirming the supply was cut off at property SP-19466, dated 18 January 2026. Single page.", "loss_adjuster_inspection_report_SP-19466.pdf - Loss adjuster's inspection report for property SP-19466, dated 16 January 2026. 6 pages, complete. Signed by the loss adjuster.", "council_flood_warning_notice_SP-19466.pdf - Council flood warning notice for property SP-19466, dated 7 November 2025. Single page.", "flood_claim_form_SP-19466_signed.pdf - Flood claim form for property SP-19466, dated 4 June 2026. 5 pages, complete. Signed by the policyholder."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 523}} {"id": "isc-te-00015-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Ambford Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "15 May 2026"}, "checklist": ["Cancellation policy acceptance, signed", "Employer sponsorship letter, issued within the last 3 months, signed", "Special requirements note", "Venue access instructions, issued within the last 3 months", "Prerequisite certificate"], "submission": {"case": {"name": "course booking WJ-95480", "reference": "PQ-38702"}, "documents received": ["cancellation-policy-acceptance-WJ-95480.pdf. A cancellation policy acceptance for course booking WJ-95480, issued on 2 February 2026. It is 1 page and signed by the delegate.", "employer-sponsorship-letter-WJ-95480.pdf. An employer sponsorship letter for course booking WJ-95480, issued on 2 March 2026. It is 1 page and signed by the employer's human resources manager.", "delegate-photo-identification-WJ-95480.pdf. Delegate photo identification for course booking WJ-95480, with an expiry date of 22 February 2028. It is 1 page.", "venue-access-instructions-WJ-95480.pdf. Venue access instructions for course booking WJ-95480, issued on 6 April 2026. It is 1 page.", "prerequisite-certificate-WJ-95480.pdf. A prerequisite certificate for course booking WJ-95480, issued on 18 January 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 759}} {"id": "isc-te-00072-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Kenvgate Ltd", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "24 March 2026"}, "checklist": ["Equipment purchase request form, signed.", "Installation requirements note.", "Cost-benefit justification.", "If the equipment uses radioactive sources, also: radiation licence valid (not expired) on the date of the review.", "Training needs assessment, signed.", "Three quotes comparison sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "equipment US-49139", "reference": "LH-38443", "details": ["The equipment uses radioactive sources."]}, "documents received": ["Scanned three quotes comparison sheet for equipment US-49139, dated 21 October 2025, signed by the procurement officer. Single page.", "Scanned cost-benefit justification for equipment US-49139, dated 8 December 2025. 3 pages, complete.", "Scanned training needs assessment for equipment US-49139, dated 12 February 2026, signed by the training coordinator. Single page.", "Scanned installation requirements note for equipment US-49139, dated 7 December 2025. 2 pages, complete.", "Scanned radiation licence for equipment US-49139, showing an expiry date of 29 January 2028. Single page.", "Scanned maintenance plan for equipment US-49139, dated 3 March 2026. 2 pages, complete.", "Scanned equipment purchase request form for equipment US-49139, dated 23 January 2026, signed by the requesting department head. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 773}} {"id": "isc-te-00386-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Orrston BV", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "18 May 2026"}, "checklist": ["Signed trial period proposal", "Line manager opinion note, signed and issued within the last 2 months", "Current working pattern statement issued within the last 3 months", "Previous flexible working requests record issued within the last 24 months", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed", "If the request is to work entirely from home, also: home working equipment checklist, signed"], "submission": {"case": {"name": "Daan Kerrridge", "reference": "XS-33835", "details": ["The employee has caring responsibilities for a dependent.", "The request is not to work entirely from home."]}, "cover note": "This pack has already been checked by a colleague before it reached me, so it should be ready for your review.", "documents received": ["Line manager opinion note - Daan Kerrridge.pdf - Line manager opinion note concerning Daan Kerrridge, dated 10 May 2026. It is 2 pages, complete, and is signed by the line manager.", "Record of another employee's request - Daan Kerrridge.pdf - Record of a request concerning Daan Kerrridge made by another employee, dated 28 April 2026. It is 1 page.", "Trial period proposal - Daan Kerrridge.pdf - Trial period proposal concerning Daan Kerrridge, dated 27 March 2026. It is 1 page and is signed by the line manager.", "Caring responsibilities statement - Daan Kerrridge.pdf - Caring responsibilities statement concerning Daan Kerrridge, dated 8 May 2026. It is 1 page and is signed by Daan Kerrridge.", "Current working pattern statement - Daan Kerrridge.pdf - Current working pattern statement concerning Daan Kerrridge, dated 10 April 2026. It is 1 page."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 623}} {"id": "isc-te-00438-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Halvmont GmbH", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "15 April 2026"}, "checklist": ["If the gateway will handle recurring subscription payments, also: subscription billing mandate template (signed)", "go-live sign-off certificate (issued within the last 1 months, signed)", "If the gateway will store customers' card details, also: card storage compliance certificate (valid (not expired) on the date of the review)", "merchant account agreement (signed)", "data protection impact assessment (issued within the last 12 months, signed)", "fraud screening configuration sheet (signed)"], "submission": {"case": {"name": "payment gateway QZ-24811", "reference": "HL-76895", "details": ["The gateway will not handle recurring subscription payments.", "The gateway will not store customers' card details."]}, "documents received": ["Merchant account agreement for payment gateway QZ-24811, dated 31 December 2025. 6 pages, complete, signed by the merchant account manager.", "Payment gateway technical specification for payment gateway QZ-24811, dated 22 February 2026. 8 pages, complete.", "Data protection impact assessment for payment gateway QZ-24811, dated 8 September 2025. 5 pages, complete, signed by the data protection officer.", "Go-live sign-off certificate for payment gateway QZ-24811, dated 28 March 2026. Single page, signed by the IT security lead.", "Fraud screening configuration sheet for payment gateway QZ-24811, dated 20 February 2026. Single page, signed by the fraud screening analyst."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 775}} {"id": "isc-te-00248-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Aldston BV", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "27 July 2026"}, "checklist": ["benefit entitlement letters issued within the last 12 months", "support plan, signed", "safeguarding referral form issued within the last 12 months, signed", "If the adult lacks capacity to make the decision about their care arrangements, also: best interests decision record, signed", "capacity assessment record, signed", "recent bank statements issued within the last 3 months", "proof of identity valid (not expired) on the date of the review"], "submission": {"case": {"name": "Elena Lundton", "reference": "VW-56695", "details": ["The adult lacks capacity to make the decision about their care arrangements."]}, "documents received": ["Needs assessment report. The document concerns Elena Lundton and shows its date of issue as 16 May 2026. 12 pages, complete. It is signed by the needs assessor.", "Proof of identity. The document concerns Elena Lundton and shows its expiry date as 10 November 2027. It is a single page.", "Support plan. The document concerns Elena Lundton and shows its date of issue as 20 April 2026. 6 pages, complete. It is signed by the care coordinator.", "Best interests decision record. The document concerns Elena Lundton and shows its date of issue as 5 July 2026. 4 pages, complete. It is signed by the best interests assessor.", "Financial assessment form. The document concerns Elena Lundton and shows its date of issue as 17 July 2026. 6 pages, complete. It is signed by the financial assessment officer.", "Capacity assessment record. The document concerns Elena Lundton and shows its date of issue as 9 April 2026. 4 pages, complete. It is signed by the capacity assessor.", "Safeguarding referral form. The document concerns Elena Lundton and shows its date of issue as 23 December 2025. 2 pages, complete. It is signed by the safeguarding lead officer.", "Recent bank statements. The document concerns Elena Lundton and shows its date of issue as 21 June 2026. 8 pages, complete.", "Benefit entitlement letters. The document concerns Elena Lundton and shows its date of issue as 19 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 932}} {"id": "isc-te-00132-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravstow SAS", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "9 July 2026"}, "checklist": ["Transfer manifest, signed.", "Cross-dock slot booking sheet, issued within the last 1 months, signed.", "Damaged goods exception sheet, issued within the last 1 months, signed.", "Transfer completion confirmation, issued within the last 1 months, signed.", "Load consolidation sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "cross-dock transfer EQ-46599", "reference": "YF-29707"}, "documents received": ["Damaged goods exception sheet for cross-dock transfer EQ-46599. Date of issue: 27 June 2026. 1 page. Signed by the warehouse operator.", "Outbound loading record for cross-dock transfer EQ-46599. Date of issue: 4 July 2026. 1 page. Signed by the outbound loading supervisor.", "Load consolidation sheet for cross-dock transfer EQ-46599. Date of issue: 14 June 2026. 2 pages, complete. Signed by the load planner.", "Transfer manifest for cross-dock transfer EQ-46599. Date of issue: 13 March 2026. 3 pages, complete. Signed by the transport planner.", "Transfer completion confirmation for cross-dock transfer EQ-46599. Date of issue: 25 June 2026. 1 page. Signed by the cross-dock supervisor.", "Cross-dock slot booking sheet for cross-dock transfer EQ-46599. Date of issue: 27 June 2026. 1 page. Signed by the cross-dock coordinator.", "Transfer completion confirmation for cross-dock transfer EQ-46599. Date of issue: 22 August 2025. 1 page. Signed by the cross-dock supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00101-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Morvdale LLP", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "20 May 2026"}, "checklist": ["Confirm the pack includes company statutes (signed).", "Confirm the pack includes company tax registration certificate.", "Confirm the pack includes proof of registered office address (issued within the last 3 months).", "Confirm the pack includes certificate of incorporation.", "Confirm the pack includes authorised signer identity document (valid (not expired) on the date of the review).", "Confirm the pack includes beneficial owner identification form (signed).", "If the company operates in a cash-intensive trade, also: cash handling policy (signed)."], "submission": {"case": {"name": "Eskholm Ltd", "reference": "DW-46602", "details": ["The company does not operate in a cash-intensive trade."]}, "documents received": ["Eskholm Ltd - Company tax registration certificate.pdf - Company tax registration certificate for Eskholm Ltd, issued 4 May 2026. Single page.", "Eskholm Ltd - Certificate of incorporation.pdf - Certificate of incorporation for Eskholm Ltd, issued 18 April 2026. Single page.", "Eskholm Ltd - Proof of registered office address.pdf - Proof of registered office address for Eskholm Ltd, issued 17 March 2026. Single page.", "Eskholm Ltd - Beneficial owner identification form.pdf - Beneficial owner identification form for Eskholm Ltd, issued 23 January 2026. 3 pages, complete. Signed by the authorised signer.", "Eskholm Ltd - Company statutes.pdf - Company statutes for Eskholm Ltd, issued 28 February 2026. 12 pages, complete. Signed by the chair of the board.", "Eskholm Ltd - Shareholder register extract.pdf - Shareholder register extract for Eskholm Ltd, issued 2 March 2026. 2 pages, complete.", "Eskholm Ltd - Business name reservation receipt.pdf - Business name reservation receipt for Eskholm Ltd, issued 18 April 2026. Single page.", "Eskholm Ltd - Authorised signer identity document.pdf - Authorised signer identity document for Eskholm Ltd, with expiry date 21 November 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The verdict complete: every applicable line is met (extra documents do not matter). The verdict incomplete: at least one applicable line is not met. The verdict unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-21", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 886}} {"id": "isc-te-00001-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Lunburg GmbH", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "25 August 2026"}, "checklist": ["Line manager confirmation, issued within the last 1 months, signed", "Equipment return receipt, issued within the last 1 months, signed", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed", "Shared mailbox handover record, issued within the last 1 months, signed", "Non-disclosure reminder acknowledgement, signed", "Access rights inventory, issued within the last 1 months"], "submission": {"case": {"name": "Sarah Harvham", "reference": "KE-21974", "details": ["The leaver held no privileged administrator accounts."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["Shared mailbox handover record - Sarah Harvham.pdf. A shared mailbox handover record concerning Sarah Harvham, dated 8 August 2026. It is 2 pages, complete, and is signed by the receiving mailbox owner.", "Final payroll cut-off note - Sarah Harvham.pdf. A final payroll cut-off note concerning Sarah Harvham, dated 20 August 2026. It is 1 page and is signed by the payroll officer.", "Line manager confirmation - Sarah Harvham.pdf. A line manager confirmation concerning Sarah Harvham, dated 4 August 2026. It is 1 page and is signed by the line manager.", "Contract of employment - Sarah Harvham.pdf. A copy of the employee's original contract of employment concerning Sarah Harvham, dated 23 July 2026. It is 1 page and is signed by the HR manager.", "Access rights inventory - Sarah Harvham.pdf. An access rights inventory concerning Sarah Harvham, dated 20 August 2026. It is 4 pages, complete.", "Equipment return receipt - Sarah Harvham.pdf. An equipment return receipt concerning Sarah Harvham, dated 10 August 2026. It is 1 page and is signed by the IT asset coordinator.", "Non-disclosure reminder acknowledgement - Sarah Harvham.pdf. A non-disclosure reminder acknowledgement concerning Sarah Harvham, dated 23 July 2026. It is 1 page and is signed by the departing employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 914}} {"id": "isc-te-00253-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Thalmont plc", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "28 July 2026"}, "checklist": ["Cost-benefit justification included.", "If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review.", "Grant fund eligibility note included, issued within the last 6 months, signed.", "Vendor quotation included, issued within the last 3 months.", "If the equipment is above the major purchase threshold, also: tender waiver justification, signed.", "Maintenance plan included."], "submission": {"case": {"name": "equipment ZW-36248", "reference": "IQ-19665", "details": ["The equipment uses no radioactive sources.", "The equipment is below the major purchase threshold."]}, "documents received": ["Maintenance plan for equipment ZW-36248, dated 15 April 2026. 2 pages, complete.", "Vendor quotation for equipment ZW-36248, dated 19 June 2026. Only page 1 of 2 is included.", "Grant fund eligibility note for equipment ZW-36248, dated 8 February 2026, 1 page. Signed by the research grants officer.", "Cost-benefit justification for equipment ZW-36248, dated 4 June 2026. 3 pages, complete.", "Equipment purchase request form for equipment ZW-36248, dated 10 May 2026, 2 pages, complete. Signed by the requesting department head."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 736}} {"id": "isc-te-00390-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Abrton Inc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "4 March 2026"}, "checklist": ["If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed", "liability claim form, signed", "public liability insurance schedule", "CCTV footage stills of the incident, issued within the last 3 months", "witness statement from a staff member, signed", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed", "photographs of the spillage on the floor, issued within the last 1 months", "cleaning log for the day of the incident, issued within the last 6 months and signed"], "submission": {"case": {"name": "Marlfeld GmbH", "reference": "IL-48734", "details": ["The customer is handling the claim personally.", "The injured customer did not go to hospital."]}, "documents received": ["liability claim form - Marlfeld GmbH.pdf. Liability claim form about Marlfeld GmbH, dated 10 December 2025. 3 pages, complete. Signed by the customer.", "CCTV footage stills of the incident - Marlfeld GmbH.pdf. CCTV footage stills of the incident about Marlfeld GmbH, dated 25 December 2025. 2 pages, complete.", "witness statement from a staff member - Marlfeld GmbH.pdf. Witness statement from a staff member about Marlfeld GmbH, dated 14 January 2026. Single page. Signed by the staff member who made the statement.", "photographs of the spillage on the floor - Marlfeld GmbH.pdf. Photographs of the spillage on the floor about Marlfeld GmbH, dated 16 February 2026. Single page.", "cleaning log for the day of the incident - Marlfeld GmbH.pdf. Cleaning log for the day of the incident about Marlfeld GmbH, dated 12 October 2025. Single page. Signed by the cleaner on duty that day.", "public liability insurance schedule - Marlfeld GmbH.pdf. Public liability insurance schedule about Marlfeld GmbH, dated 13 December 2025. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 899}} {"id": "isc-te-00440-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vornshaw Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "26 June 2026"}, "checklist": ["Check that the pack contains the proposed architecture diagram.", "Check that the pack contains the review board feedback summary, issued within the last 3 months and signed.", "Check that the pack contains the security threat model, issued within the last 6 months.", "If the design introduces a new third-party dependency, also check that the pack contains the third-party dependency risk assessment, issued within the last 6 months and signed.", "Check that the pack contains the alternatives considered table.", "Check that the pack contains the cost estimate sheet, issued within the last 6 months."], "submission": {"case": {"name": "design document HR-11465", "reference": "YD-70116", "details": ["The design introduces no new third-party dependency."]}, "cover note": "All the paperwork is in order, so a quick approval would be much appreciated.", "documents received": ["HR-11465 security threat model 28 April 2026.pdf - Security threat model about design document HR-11465, showing a date of issue of 28 April 2026. 4 pages, complete.", "HR-11465 cost estimate sheet 28 February 2026.pdf - Cost estimate sheet about design document HR-11465, showing a date of issue of 28 February 2026. 2 pages, complete.", "HR-11465 review board feedback summary 17 May 2026.pdf - Review board feedback summary about design document HR-11465, showing a date of issue of 17 May 2026. 2 pages, complete. Signed by the architecture review board chair.", "HR-11465 problem statement page 11 June 2026.pdf - Problem statement page about design document HR-11465, showing a date of issue of 11 June 2026. 2 pages, complete.", "HR-11465 alternatives considered table 4 March 2026.pdf - Alternatives considered table about design document HR-11465, showing a date of issue of 4 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 904}} {"id": "isc-te-00466-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silberg & Co", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "19 June 2026"}, "checklist": ["Venue access instructions, issued within the last 3 months", "Cancellation policy acceptance, signed", "Payment confirmation, issued within the last 3 months", "Prerequisite certificate", "Delegate photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "course booking EZ-28200", "reference": "MC-76518"}, "cover note": "Hi, everything needed is attached and complete. Please confirm once you have reviewed the pack. Many thanks.", "documents received": ["Venue access instructions for course booking EZ-28200. Date of issue: 30 March 2026. Single page.", "File scan_0027.pdf. The file will not open, so its contents cannot be seen.", "Payment confirmation for course booking EZ-28200. Date of issue: 14 June 2026. Single page.", "Course booking form for course booking EZ-28200. Date of issue: 2 April 2026. 2 pages, complete. Signed by the delegate.", "Prerequisite certificate for course booking EZ-28200. Date of issue: 10 June 2026. Single page.", "Cancellation policy acceptance for course booking EZ-28200. Date of issue: 19 May 2026. Signed by the delegate. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 727}} {"id": "isc-te-00364-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Corvfeld plc", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "8 July 2026"}, "checklist": ["Data migration confirmation, issued within the last 3 months, signed.", "Dependent systems check report, issued within the last 3 months.", "Asset register update, issued within the last 1 month.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed.", "Licence reassignment note, issued within the last 3 months, signed.", "Data wipe certificate, issued within the last 3 months, signed.", "Decommission request form, signed."], "submission": {"case": {"name": "retired server IS-34675", "reference": "HO-82305"}, "documents received": ["Data migration confirmation for retired server IS-34675, dated 27 May 2026. 2 pages, complete. Signed by the operations lead.", "Network disconnection confirmation for retired server IS-34675, dated 30 June 2026. Single page. Signed by the network engineer who performed the disconnection.", "Decommission request form for retired server IS-34675, dated 17 March 2026. 2 pages, complete. Signed by the requesting team manager.", "Asset register update for retired server IS-34675, dated 2 July 2026. Single page.", "Data wipe certificate for retired server IS-34675, dated 26 May 2026. Single page. Signed by the engineer who carried out the wipe.", "Licence reassignment note for retired server IS-34675, dated 4 May 2026. Single page. Signed by the operations lead.", "Dependent systems check report for retired server IS-34675, dated 2 July 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 824}} {"id": "isc-te-00161-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Kenvcliff & Co", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "17 June 2026"}, "checklist": ["Financial expenditure summary, issued within the last 3 months and signed.", "Annual activity report, issued within the last 6 months and signed.", "If the institute received industry funding above the university's disclosure threshold, also: industry funding disclosure statement, issued within the last 12 months and signed.", "Staffing plan, issued within the last 6 months and signed.", "External advisory board minutes, issued within the last 12 months and signed.", "Director's declaration of interests, issued within the last 12 months and signed."], "submission": {"case": {"name": "Iskmoor & Co", "reference": "YW-63386", "details": ["The institute received industry funding above the university's disclosure threshold."]}, "cover note": "My apologies, this pack had to be put together in a rush, so thank you for bearing with us.", "documents received": ["Publications list for Iskmoor & Co, dated 28 January 2026. 4 pages, complete.", "Doctoral researcher progress summary for Iskmoor & Co, dated 9 April 2026. 2 pages, complete. Signed by the head of doctoral studies.", "Organisational chart for Iskmoor & Co, dated 10 March 2026, showing the structure from three years ago. 2 pages, complete. Signed by the institute director.", "Staffing plan for Iskmoor & Co, dated 10 March 2026. 2 pages, complete. Signed by the institute director.", "Financial expenditure summary for Iskmoor & Co, dated 11 May 2026. 3 pages, complete. Signed by the institute finance officer.", "Industry funding disclosure statement for Iskmoor & Co, dated 22 March 2026. A single page. Signed by the institute director.", "Annual activity report for Iskmoor & Co, dated 26 February 2026. 12 pages, complete. Signed by the institute director.", "External advisory board minutes for Iskmoor & Co, dated 19 December 2025. 4 pages, complete. Signed by the chair of the external advisory board.", "Director's declaration of interests for Iskmoor & Co, dated 14 May 2026. A single page. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Consider every checklist line that applies to this case. A required document counts only when it is the kind of document listed (not a similar one), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it has not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": true, "instructions": "variant-4", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 938}} {"id": "isc-te-00303-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Fravfell Partners", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "22 April 2026"}, "checklist": ["Staff training record for the duty manager, issued within the last 24 months and signed", "CCTV footage stills of the incident, issued within the last 3 months", "Incident report from the day, issued within the last 3 months and signed", "Cleaning log for the day of the incident, issued within the last 6 months and signed", "Witness statement from a staff member, signed"], "submission": {"case": {"name": "Dornmere LLP", "reference": "YX-91405"}, "documents received": ["Staff training record for the duty manager, Dornmere LLP, dated 2 May 2025. 2 pages, complete. Signed by the duty manager.", "Incident report from the day, Dornmere LLP, dated 11 February 2026. 2 pages, complete. Signed by the duty manager.", "Witness statement from a staff member, Dornmere LLP, dated 11 April 2026. 1 page. Signed by the staff member who wrote it.", "CCTV footage stills of the incident, Dornmere LLP, dated 23 March 2026. 2 pages, complete.", "Cleaning log for the day of the incident, Dornmere LLP, dated 24 January 2026. 1 page. Signed by the cleaner."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack meets the checklist. Go line by line through the checklist, covering every line relevant to this case. To count, a required document must be of the kind listed on the checklist (not a similar one), be about the subject of the case, have all its pages present, be signed wherever the checklist calls for a signature, not be expired on the date of the review, and fall within the issue period the checklist allows. A conditional line applies only when its circumstance is true for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: one or more applicable lines are not satisfied. unclear: no applicable line is clearly unmet, yet at least one cannot be determined from what is shown, such as a needed date, signature or page count being not visible, a document's kind being impossible to tell, or the case details not stating whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels can mislead; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-37", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 733}} {"id": "isc-te-00180-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Weskfield SAS", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "24 July 2026"}, "checklist": ["Confirm the pack includes the rollback plan, signed.", "Confirm the pack includes the firewall change request form, signed.", "Confirm the pack includes the current rule set export, issued within the last 1 months.", "Confirm the pack includes the peer review checklist, issued within the last 1 months, signed."], "submission": {"case": {"name": "firewall change GH-61214", "reference": "TJ-47386"}, "documents received": ["rollback_plan_GH-61214.pdf — Rollback plan for firewall change GH-61214, dated 22 May 2026. 2 pages, complete. Signed by the network security team lead.", "firewall_change_request_GH-61214.pdf — Firewall change request form for firewall change GH-61214, dated 13 July 2026. 3 pages, complete. Signed by the requesting change manager.", "peer_review_checklist_GH-61214.pdf — Peer review checklist for firewall change GH-61214, dated 13 July 2026. Single page. Signed by the peer reviewer.", "current_rule_set_export_GH-61214.pdf — Current rule set export for firewall change GH-61214, dated 11 July 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 721}} {"id": "isc-te-00244-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Elstley plc", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 June 2026"}, "checklist": ["Travel request form, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Travel policy acknowledgement, signed.", "Hotel booking confirmation.", "Passport copy for international travel, valid (not expired) on the date of the review."], "submission": {"case": {"name": "business trip CM-86741", "reference": "KC-24296"}, "documents received": ["CM-86741_travel_request_form.pdf. Travel request form for business trip CM-86741, issued 3 May 2026. Signed by the traveller, 2 pages, complete.", "CM-86741_passport_copy.pdf. Passport copy for international travel for business trip CM-86741, single page. The passport expires 10 December 2028.", "CM-86741_travel_policy_acknowledgement.pdf. Travel policy acknowledgement for business trip CM-86741, issued 21 May 2026. Signed by the traveller, single page.", "CM-86741_hotel_booking_confirmation.pdf. Hotel booking confirmation for business trip CM-86741, issued 28 February 2026, 2 pages, complete.", "CM-86741_flight_itinerary_quote.pdf. Flight itinerary quote for business trip CM-86741, issued 11 June 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 742}} {"id": "isc-te-00410-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Faldmark Ltd", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "27 August 2026"}, "checklist": ["Check that the IT equipment loan form is present and signed.", "Check that the placement learning plan is present and signed.", "Check that the internship agreement is present and signed.", "Check that the confidentiality undertaking is present and signed.", "If the internship is paid, also check that the payroll registration form is present and signed.", "Check that the right to work check record is present, signed, and issued within the last 6 months."], "submission": {"case": {"name": "Carmen Radton", "reference": "DN-88378", "details": ["The internship is paid."]}, "documents received": ["Internship agreement for Carmen Radton, dated 8 June 2026. 4 pages, complete. Signed by the marketing manager.", "Confidentiality undertaking for Carmen Radton, dated 10 August 2026. 2 pages, complete. Signed by Carmen Radton.", "Payroll registration form for Carmen Radton, dated 21 August 2026. 2 pages, complete. Signed by the payroll officer.", "Placement learning plan for Carmen Radton, dated 10 May 2026. 2 pages, complete. Signed by the marketing supervisor.", "Right to work check record for Carmen Radton, dated 29 March 2026. Single page. Signed by the HR officer.", "IT equipment loan form for Carmen Radton, dated 15 August 2026. Single page. Signed by the IT manager."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Go through all checklist lines that apply to this case. To count, a required document must be the kind of document listed rather than a similar one, must be about the subject of the case, must have all its pages, must be signed wherever the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-62", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00283-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Weskwood GmbH", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "29 May 2026"}, "checklist": ["Proof of deposit issued within the last 3 months", "Employment certificate issued within the last 1 month and signed", "Property valuation report issued within the last 6 months and signed", "Photo identity document valid (not expired) on the date of the review", "Bank statement issued within the last 3 months", "Mortgage application form, signed"], "submission": {"case": {"name": "property XP-89411", "reference": "BB-98566"}, "documents received": ["property_valuation_report_XP-89411.pdf. A property valuation report for property XP-89411, dated 19 March 2026. It has 10 pages, complete, and is signed by the valuer.", "proof_of_deposit_XP-89411.pdf. A proof of deposit for property XP-89411, dated 10 April 2026. It is a single page.", "employment_certificate_XP-89411_v2.pdf. An employment certificate for property XP-89411, dated 27 May 2026. It is a single page and its signature line is empty.", "sale_and_purchase_agreement_XP-89411.pdf. A sale and purchase agreement for property XP-89411, dated 8 March 2026. It has 9 pages, complete, and is signed by the buyer and the seller.", "photo_identity_document_XP-89411.pdf. A photo identity document for property XP-89411 showing an expiry date of 14 November 2027. It is a single page.", "bank_statement_XP-89411.pdf. A bank statement for property XP-89411, dated 30 March 2026. It has 3 pages, complete.", "mortgage_application_form_XP-89411.pdf. A mortgage application form for property XP-89411, dated 31 March 2026. It has 6 pages, complete, and is signed by the applicant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 887}} {"id": "isc-te-00082-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Larvcourt Inc", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "29 July 2026"}, "checklist": ["Localisation completeness report, issued within the last 1 month", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months and signed", "Marketing screenshot pack", "Privacy policy update, issued within the last 3 months", "If the mobile app release adds a new payment feature, also: payment provider compliance checklist, issued within the last 3 months and signed", "Store listing description, issued within the last 1 month", "Age rating questionnaire, signed"], "submission": {"case": {"name": "mobile app release GK-81797", "reference": "ZI-76687", "details": ["The mobile app release includes third-party analytics.", "The mobile app release adds a new payment feature."]}, "cover note": "Could you approve this pack as soon as possible? All the paperwork is in order.", "documents received": ["device-compatibility-matrix-GK-81797.pdf — Device compatibility matrix for mobile app release GK-81797. It shows its date of issue as 28 June 2026. 2 pages, complete.", "payment-provider-compliance-checklist-GK-81797.pdf — Payment provider compliance checklist for mobile app release GK-81797. It shows its date of issue as 4 July 2026. 3 pages, complete, signed by the Payments Lead.", "localisation-completeness-report-GK-81797.pdf — Localisation completeness report for mobile app release GK-81797. It shows its date of issue as 23 July 2026. 2 pages, complete.", "marketing-screenshot-pack-GK-81797.pdf — Marketing screenshot pack for mobile app release GK-81797. It shows its date of issue as 31 May 2026. 6 pages, complete.", "privacy-policy-update-GK-81797.pdf — Privacy policy update for mobile app release GK-81797. The date of issue is smudged and cannot be read. 2 pages, complete.", "store-listing-description-GK-81797.pdf — Store listing description for mobile app release GK-81797. It shows its date of issue as 15 July 2026. It is 1 page.", "age-rating-questionnaire-GK-81797.pdf — Age rating questionnaire for mobile app release GK-81797. It shows its date of issue as 17 April 2026. 2 pages, complete, signed by the Mobile Release Manager.", "analytics-data-consent-statement-GK-81797.pdf — Analytics data consent statement for mobile app release GK-81797. It shows its date of issue as 29 June 2026. It is 1 page, signed by the Data Protection Officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1064}} {"id": "isc-te-00277-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Holham Ltd", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "16 April 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed.", "Payroll deduction agreement for recovery of the advance, signed.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Line manager approval for the advance, signed.", "Costed trip estimate sheet, issued within the last 3 months and signed.", "Travel policy extract showing advance eligibility."], "submission": {"case": {"name": "Xiu Yellisey", "reference": "OK-65774", "details": ["The requested advance is within the standard advance limit."]}, "documents received": ["Travel policy extract showing advance eligibility for Xiu Yellisey, dated 27 December 2025. Single page.", "Trip itinerary and approval for Xiu Yellisey, dated 25 January 2026. 2 pages, complete. Signed by the line manager.", "Employee bank detail confirmation for Xiu Yellisey, dated 1 March 2026. Single page. Signed by the employee, Xiu Yellisey.", "Payroll deduction agreement for recovery of the advance for Xiu Yellisey, dated 11 January 2026. Single page. Signed by the employee, Xiu Yellisey.", "Line manager approval for the advance for Xiu Yellisey, dated 24 December 2025. Single page. Signed by the line manager.", "Costed trip estimate sheet for Xiu Yellisey, dated 2 March 2026. Single page. Signed by the line manager.", "Trip itinerary and approval for Xiu Yellisey, dated 18 August 2025. 2 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00488-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Dravwood & Co", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "22 May 2026"}, "checklist": ["Breach evidence log, issued within the last 1 month and signed", "Original service agreement copy", "Losses calculation statement, issued within the last 1 month and signed", "If the defaulting party is a public sector body, also: public sector termination approvals record, issued within the last 3 months and signed", "If the contract requires a dispute to go to mediation first, also: mediation request confirmation, issued within the last 1 month and signed", "Default notice previously served, issued within the last 6 months and signed"], "submission": {"case": {"name": "Bravberg SAS", "reference": "YW-54965", "details": ["The defaulting party is a public sector body.", "The contract allows termination without prior mediation."]}, "documents received": ["Default notice previously served on Bravberg SAS, dated 21 December 2025. Single page. Signed by the contracts manager.", "Public sector termination approvals record for Bravberg SAS, dated 28 March 2026. 2 pages, complete. Signed by the head of procurement.", "Original service agreement copy relating to Bravberg SAS, dated 22 March 2026. Pages 1 to 6 are included; the total number of pages is not shown anywhere.", "Breach evidence log for Bravberg SAS, dated 13 May 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Losses calculation statement for Bravberg SAS, dated 8 May 2026. 3 pages, complete. Signed by the finance manager."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 768}} {"id": "isc-te-00205-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Larvwick GmbH", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "23 July 2026"}, "checklist": ["Line manager opinion note, issued within the last 2 months and signed", "Impact assessment on the team, signed", "Previous flexible working requests record, issued within the last 24 months", "Current working pattern statement, issued within the last 3 months", "Flexible working request form, signed"], "submission": {"case": {"name": "Lena Lovsall", "reference": "IC-55479"}, "documents received": ["previous_flexible_working_requests_record.pdf. A previous flexible working requests record about Lena Lovsall, dated 13 July 2025. It is a single page.", "line_manager_opinion_note.pdf. A line manager opinion note about Lena Lovsall, dated 16 June 2026. 2 pages, complete. It is signed by the line manager.", "current_working_pattern_statement.pdf. A current working pattern statement about Lena Lovsall, dated 6 May 2026. It is a single page.", "proposed_working_pattern_plan.pdf. A proposed working pattern plan about Lena Lovsall, dated 24 May 2026. 2 pages, complete. It is signed by the line manager.", "impact_assessment_on_the_team.pdf. An impact assessment on the team about Lena Lovsall, dated 8 May 2026. 3 pages, complete. It is signed by the line manager.", "flexible_working_request_form.pdf. A flexible working request form about Lena Lovsall, dated 21 April 2026. 3 pages, complete. It is signed by Lena Lovsall."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every checklist line relevant to this case. A required document only counts if it is the kind of document listed (not a similar one), concerns the subject of the case, contains all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. Say complete: every applicable line is met (extra documents do not matter). Say incomplete: at least one applicable line is not met. Say unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-14", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 762}} {"id": "isc-te-00337-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Marlgate & Co", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "19 August 2026"}, "checklist": ["Confirm the pack contains a passport style photograph issued within the last 6 months.", "Confirm the pack contains a photo driving licence that is valid, not expired, on the date of the review, 19 August 2026.", "If the applicant is applying for a hackney carriage licence rather than private hire, also confirm the pack contains a vehicle specification sheet for the hackney carriage.", "Confirm the pack contains a medical examination certificate issued within the last 6 months and signed.", "Confirm the pack contains a signed driver declaration of convictions.", "If the applicant has lived at an address outside the country in the last five years, also confirm the pack contains a criminal record certificate from overseas issued within the last 3 months."], "submission": {"case": {"name": "Lotte Wadova", "reference": "JI-80519", "details": ["The applicant is applying for a hackney carriage licence rather than private hire.", "The applicant has lived at an address outside the country in the last five years."]}, "documents received": ["Driving_licence_expiry_18August2026_Wadova_JI80519.pdf: A photo driving licence for Lotte Wadova. It shows an expiry date of 18 August 2026. 2 pages, complete.", "Convictions_declaration_Wadova_JI80519.pdf: A driver declaration of convictions for Lotte Wadova. It shows a date of issue of 6 May 2026. It is a single page. It is signed by the driver.", "Overseas_criminal_record_certificate_Wadova_JI80519.pdf: A criminal record certificate from overseas for Lotte Wadova. It shows a date of issue of 1 July 2026. 4 pages, complete.", "Application_form_Wadova_JI80519.pdf: A licence application form for Lotte Wadova. It shows a date of issue of 21 May 2026. 6 pages, complete. It is signed by the applicant.", "Vehicle_specification_sheet_Wadova_JI80519.pdf: A vehicle specification sheet for the hackney carriage relating to Lotte Wadova. It shows a date of issue of 4 June 2026. 2 pages, complete.", "Knowledge_test_pass_certificate_Wadova_JI80519.pdf: A knowledge test pass certificate for Lotte Wadova. It shows a date of issue of 17 May 2026. It is a single page.", "Photograph_Wadova_JI80519.pdf: A passport style photograph of Lotte Wadova. It shows a date of issue of 30 June 2026. It is a single page.", "Medical_certificate_Wadova_JI80519.pdf: A medical examination certificate for Lotte Wadova. It shows a date of issue of 28 July 2026. 2 pages, complete. It is signed by the examining doctor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "expired", "defect": "expired before the review", "n_lines": 6, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1077}} {"id": "isc-te-00154-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Gravheim & Co", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "19 May 2026"}, "checklist": ["If the supplier missed the agreed service levels, also: service credit request form (signed)", "Service level summary (issued within the last 12 months)", "Contract compliance checklist (signed)", "Quality inspection report (issued within the last 6 months, signed)", "Invoice discrepancy log", "Supplier performance scorecard (signed)", "Supplier response letter (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Jorstead GmbH", "reference": "CT-25492", "details": ["The supplier missed the agreed service levels."]}, "documents received": ["Service credit request form for Jorstead GmbH, dated 29 January 2026. Signed by the contract manager. Single page.", "Service level summary for Jorstead GmbH, dated 14 October 2025. Single page.", "Supplier response letter for Jorstead GmbH, dated 27 April 2026. Signed by the supplier's account director. Single page.", "Quality inspection report for Jorstead GmbH, dated 12 May 2026. Signed by the quality inspector. 3 pages, complete.", "Contract compliance checklist for Jorstead GmbH, dated 5 February 2026. Signed by the contract manager. 3 pages, complete.", "Supplier performance scorecard for Jorstead GmbH, dated 14 April 2026. Signed by the supplier manager. 2 pages, complete.", "Invoice discrepancy log for Jorstead GmbH, dated 10 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The verdict complete: every applicable line is met (extra documents do not matter). The verdict incomplete: at least one applicable line is not met. The verdict unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-21", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 770}} {"id": "isc-te-00224-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Uldvale plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "9 June 2026"}, "checklist": ["If the customer requests a credit limit above the standard cap, also: finance director sanction letter (issued within the last 1 months, signed)", "Trade references letter (issued within the last 3 months, signed)", "Credit reference agency report (issued within the last 3 months)", "Personal guarantee (signed)", "Bank reference letter (issued within the last 6 months, signed)", "Signed credit terms agreement (signed)", "Company registration certificate"], "submission": {"case": {"name": "Holthorpe Limited", "reference": "ES-61445", "details": ["The customer does not request a credit limit above the standard cap."]}, "documents received": ["Trade account application form - Holthorpe Limited.pdf - Trade account application form about Holthorpe Limited, dated 26 February 2026. It is 3 pages, complete. It is signed by a director of Holthorpe Limited.", "Bank reference letter - Holthorpe Limited.pdf - Bank reference letter about Holthorpe Limited, dated 14 March 2026. It is 1 page. It is signed by the bank manager.", "Personal guarantee - Holthorpe Limited.pdf - Personal guarantee about Holthorpe Limited, dated 20 February 2026. It is 2 pages, complete. It is signed by the guarantor.", "Signed credit terms agreement - Holthorpe Limited.pdf - Signed credit terms agreement about Holthorpe Limited, dated 31 March 2026. It is 4 pages, complete. It is signed by a director of Holthorpe Limited.", "Company registration certificate - Holthorpe Limited.pdf - Company registration certificate about Holthorpe Limited, dated 2 April 2026. It is 2 pages, complete.", "Credit reference agency report - Holthorpe Limited.pdf - Credit reference agency report about Holthorpe Limited, dated 26 May 2026. It is 6 pages, complete.", "Credit limit approval memo - Holthorpe Limited.pdf - Credit limit approval memo about Holthorpe Limited, dated 27 May 2026. It is 1 page. It is signed by the credit control manager.", "Trade references letter - Holthorpe Limited.pdf - Trade references letter about Holthorpe Limited, dated 3 April 2026. It is 1 page. It is signed by a director of the referee company."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 947}} {"id": "isc-te-00457-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Kenvdale BV", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "16 June 2026"}, "checklist": ["If the requested advance is above the standard advance limit, also: finance director approval for the higher advance (signed)", "Travel advance request form (signed)", "Travel policy extract showing advance eligibility", "Costed trip estimate sheet (issued within the last 3 months, signed)", "Line manager approval for the advance (signed)", "Trip itinerary and approval (issued within the last 3 months, signed)", "Payroll deduction agreement for recovery of the advance (signed)"], "submission": {"case": {"name": "Orla Natfield", "reference": "LZ-40963", "details": ["The requested advance is above the standard advance limit."]}, "documents received": ["Travel policy extract - Orla Natfield - 28 February 2026.pdf. A travel policy extract showing advance eligibility relating to Orla Natfield, dated 28 February 2026. It is 1 page.", "Payroll deduction agreement - Orla Natfield - 31 May 2026.pdf. A payroll deduction agreement for recovery of the advance relating to Orla Natfield, dated 31 May 2026. It is 1 page and signed by the employee.", "Travel advance request form - Orla Natfield - 2 May 2026.pdf. A travel advance request form relating to Orla Natfield, dated 2 May 2026. It is 1 page and signed by the employee.", "FD approval higher advance - Orla Natfield - 4 March 2026.pdf. A finance director approval for the higher advance relating to Orla Natfield, dated 4 March 2026. It is 1 page and carries the signature of the finance director.", "Costed trip estimate sheet - Orla Natfield - 22 May 2026.pdf. A costed trip estimate sheet relating to Orla Natfield, dated 22 May 2026. It is 1 page and signed by the employee.", "Line manager approval - Orla Natfield - 25 February 2026.pdf. A line manager approval for the advance relating to Orla Natfield, dated 25 February 2026. It is 1 page and signed by the line manager.", "Trip itinerary and approval - Orla Natfield - 9 March 2025.pdf. A trip itinerary and approval relating to Orla Natfield, dated 9 March 2025. It is 2 pages, complete, and signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 979}} {"id": "isc-te-00006-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Lindby Limited", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "26 August 2026"}, "checklist": ["Outstanding advance clearance check, signed.", "Trip itinerary and approval, issued within the last 3 months, signed.", "Employee bank detail confirmation, issued within the last 6 months, signed.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Travel advance request form, signed.", "Costed trip estimate sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "Mert Tadsall", "reference": "BC-86447", "details": ["The requested advance is within the standard advance limit."]}, "documents received": ["BC-86447_travel_advance_request_form_Mert_Tadsall.pdf - Travel advance request form for Mert Tadsall, dated 13 August 2026. 1 page. Signed by Mert Tadsall, the employee.", "BC-86447_costed_trip_estimate_sheet_Mert_Tadsall.pdf - Costed trip estimate sheet for Mert Tadsall, dated 9 August 2026. 1 page. Signed by the line manager.", "BC-86447_trip_itinerary_and_approval_Mert_Tadsall.pdf - Trip itinerary and approval for Mert Tadsall, dated 6 August 2026. 2 pages, complete. Signed by the line manager.", "BC-86447_outstanding_advance_clearance_check_Mert_Tadsall.pdf - Outstanding advance clearance check for Mert Tadsall, dated 3 June 2026. 1 page. Signed by the accounts payable supervisor.", "BC-86447_employee_bank_detail_confirmation_Mert_Tadsall.pdf - Employee bank detail confirmation for Mert Tadsall, dated 13 March 2026. 1 page. Signed by the payroll officer.", "BC-86447_payroll_deduction_agreement_Mert_Tadsall.pdf - Payroll deduction agreement for recovery of the advance for Mert Tadsall, dated 7 July 2026. 1 page. Signed by the payroll officer.", "BC-86447_bank_statement_colleague.pdf - Bank statement belonging to a colleague, filed in the name of Mert Tadsall, dated 13 March 2026. 1 page. Signed by the colleague, the account holder."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Step through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete if every applicable line is met (extra documents do not matter). Reply incomplete if at least one applicable line is not met. Reply unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, which may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-27", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 935}} {"id": "isc-te-00237-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Baxside Limited", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "16 March 2026"}, "checklist": ["Bank interest statement issued within the last 13 months", "Pension contribution certificate issued within the last 13 months", "Capital gains asset record", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Tax return draft printout, signed", "Childcare payment receipt issued within the last 13 months"], "submission": {"case": {"name": "household tax affairs MV-6666", "reference": "AI-52954", "details": ["The household sold no property other than its main home during the tax year."]}, "documents received": ["childcare-payment-receipt-MV-6666-feb2025.pdf - Childcare payment receipt for household tax affairs MV-6666. Date of issue: 4 February 2025. Single page.", "pension-contribution-certificate-MV-6666.pdf - Pension contribution certificate for household tax affairs MV-6666. Date of issue: 26 January 2026. 2 pages, complete.", "bank-interest-statement-MV-6666.pdf - Bank interest statement for household tax affairs MV-6666. Date of issue: 25 January 2026. 3 pages, complete.", "tax-return-draft-printout-MV-6666.pdf - Tax return draft printout for household tax affairs MV-6666. Date of issue: 8 December 2025. 6 pages, complete. Signed by the filer.", "capital-gains-asset-record-MV-6666.pdf - Capital gains asset record for household tax affairs MV-6666. Date of issue: 28 December 2025. 2 pages, complete.", "employment-income-summary-MV-6666.pdf - Employment income summary for household tax affairs MV-6666. Date of issue: 17 March 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 865}} {"id": "isc-te-00442-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Hesklund Group", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "9 March 2026"}, "checklist": ["Alerting rules review note, issued within the last 3 months.", "Remediation items list, issued within the last 3 months, signed.", "Postmortem meeting minutes, issued within the last 3 months, signed.", "Service level objective breach record, issued within the last 3 months."], "submission": {"case": {"name": "production incident SQ-16361", "reference": "TM-87011"}, "documents received": ["incident-timeline-SQ-16361.pdf — Incident timeline for production incident SQ-16361, dated 5 January 2026. 3 pages, complete.", "remediation-items-list-SQ-16361.pdf — Remediation items list for production incident SQ-16361, dated 7 February 2026. 2 pages, complete. Signed by the reliability engineering team lead.", "postmortem-meeting-minutes-SQ-16361-190825.pdf — Postmortem meeting minutes for production incident SQ-16361, dated 19 August 2025. 3 pages, complete. Signed by the reliability engineering team lead.", "alerting-rules-review-note-SQ-16361.pdf — Alerting rules review note for production incident SQ-16361, dated 27 January 2026. 2 pages, complete.", "service-level-objective-breach-record-SQ-16361.pdf — Service level objective breach record for production incident SQ-16361, dated 26 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Look at each checklist line that applies to this case. A required document will only count if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Where a line is conditional, it applies only when its circumstance holds for the case. Give the answer complete: every applicable line is met (extra documents do not matter). Give the answer incomplete: at least one applicable line is not met. Give the answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-17", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00176-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Larvcliff Partners", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "9 March 2026"}, "checklist": ["Check that the pack contains a hotel invoice issued within the last 6 months.", "Check that the pack contains a train ticket receipt.", "Check that the pack contains a signed expense claim form.", "Check that the pack contains a conference fee invoice issued within the last 12 months.", "Check that the pack contains a restaurant receipt issued within the last 6 months."], "submission": {"case": {"name": "Lucy Wraxock", "reference": "HW-17248"}, "documents received": ["Hotel invoice for Noor Nebbford. Date of issue: 9 November 2025. 2 pages, complete.", "Expense claim form for Lucy Wraxock. Date of issue: 13 February 2026. 2 pages, complete. Signed by the claiming employee.", "Conference fee invoice for Lucy Wraxock. Date of issue: 31 December 2025. Single page.", "Train ticket receipt for Lucy Wraxock. Date of issue: 18 December 2025. Single page.", "Restaurant receipt for Lucy Wraxock. Date of issue: 10 October 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 668}} {"id": "isc-te-00354-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Urvwood Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "1 May 2026"}, "checklist": ["If the design changes how customer data is stored, also include: data protection review sign-off (signed)", "Include: proposed architecture diagram", "Include: security threat model (issued within the last 6 months)", "Include: capacity and load estimate (issued within the last 6 months)", "Include: review board feedback summary (issued within the last 3 months, signed)", "Include: problem statement page", "Include: migration and rollout plan"], "submission": {"case": {"name": "design document DI-65969", "reference": "WL-84298", "details": ["The design changes how customer data is stored."]}, "documents received": ["A capacity and load estimate for design document DI-65969, dated 18 February 2026. 3 pages, complete.", "A migration and rollout plan for design document DI-65969, dated 20 February 2026. 3 pages, complete.", "A cost estimate sheet for design document DI-65969, dated 11 April 2026. 2 pages, complete.", "A problem statement page for design document DI-65969, dated 13 March 2026. 2 pages, complete.", "A review board feedback summary for design document DI-65969, dated 1 March 2026. 2 pages, complete. Signed by the review board chair.", "A security threat model for design document DI-65969, dated 18 January 2026. 4 pages, complete.", "A proposed architecture diagram for design document DI-65969, dated 8 April 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 794}} {"id": "isc-te-00011-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ebrhurst BV", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "16 March 2026"}, "checklist": ["Credit bureau report issued within the last 1 months", "Bank statement issued within the last 3 months", "Signed sale and purchase agreement", "Employment certificate issued within the last 1 months and signed", "Property valuation report issued within the last 6 months and signed", "Photo identity document valid (not expired) on the date of the review"], "submission": {"case": {"name": "property JV-52110", "reference": "YG-70426"}, "documents received": ["employment_certificate_JV-52110.pdf — Employment certificate for property JV-52110, dated 11 March 2026. Single page. Signed by the employer.", "proof_of_deposit_JV-52110.pdf — Proof of deposit for property JV-52110, dated 5 February 2026. Single page.", "credit_bureau_report_JV-52110.pdf — Credit bureau report for property JV-52110, dated 3 March 2026. 4 pages, complete.", "property_valuation_report_JV-52110.pdf — Property valuation report for property JV-52110, dated 6 November 2025. Signed by the valuer. 10 pages, complete.", "photo_identity_document_JV-52110.pdf — Photo identity document for property JV-52110, expiring 19 March 2028. Single page.", "bank_statement_JV-52110.pdf — Bank statement for property JV-52110, dated 17 February 2026. 3 pages, complete.", "student_card_with_photo_JV-52110.pdf — Student card with a photo for property JV-52110, expiring 19 March 2028. Single page.", "sale_and_purchase_agreement_JV-52110.pdf — Sale and purchase agreement for property JV-52110, dated 26 November 2025. Signed by the buyer and the seller. 9 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when checked against the checklist? Go through each checklist line that applies to this case. A required document counts only when it is the kind of document listed (not a similar one), concerns the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued inside the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: at least one applicable line is not satisfied. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-39", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 891}} {"id": "isc-te-00316-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Weskwell Inc", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "2 July 2026"}, "checklist": ["Previous audit findings closure file (signed)", "Layout tour plan (signed)", "Audit agenda (signed)", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary (issued within the last 3 months, signed)", "Calibration status summary (issued within the last 1 months, signed)", "Open corrective action list (issued within the last 1 months, signed)"], "submission": {"case": {"name": "customer audit visit YP-49316", "reference": "TE-85611", "details": ["The customer auditor requests access to sub-tier supplier records."]}, "documents received": ["Calibration status summary for customer audit visit YP-49316, dated 25 June 2026. 2 pages, complete. Signed by the metrology manager.", "Open corrective action list for customer audit visit YP-49316, dated 28 June 2026. 2 pages, complete. Signed by the quality management office manager.", "Audit agenda for customer audit visit YP-49316, dated 4 June 2026. Single page. Signed by the quality management office manager.", "Previous audit findings closure file for customer audit visit YP-49316, dated 5 May 2026. 6 pages, complete. Signed by the quality management office manager.", "List of corrective actions closed two years ago for customer audit visit YP-49316, dated 28 June 2026. 2 pages, complete. Signed by the quality management office manager.", "Layout tour plan for customer audit visit YP-49316, dated 28 March 2026. Single page. Signed by the quality management office manager.", "Sub-tier supplier records summary for customer audit visit YP-49316, dated 16 May 2026. 3 pages, complete. Signed by the purchasing manager."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack fulfils the checklist. Examine every checklist line that applies to this case. For a required document to count, it must be the kind listed (not a similar kind), be about the case's subject, have all its pages, be signed wherever the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line fails. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-11", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 852}} {"id": "isc-te-00143-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Sardbrook Limited", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "17 August 2026"}, "checklist": ["Confirm the pack contains an IT equipment loan form that has been signed.", "Confirm the pack contains a placement learning plan that has been signed.", "Confirm the pack contains a workplace induction checklist that has been issued within the last 1 months and that has been signed.", "Confirm the pack contains an emergency contact form.", "Confirm the pack contains a mentor assignment note that has been signed."], "submission": {"case": {"name": "Lukas Natby", "reference": "WQ-44926"}, "documents received": ["An internship agreement for Lukas Natby, dated 1 June 2026; 4 pages, complete, signed by the internship coordinator.", "A one-page mentor assignment note for Lukas Natby, dated 10 June 2026, signed by the mentoring programme lead.", "A one-page IT equipment loan form for Lukas Natby, dated 6 May 2026, signed by the IT equipment loans officer.", "A one-page emergency contact form for Lukas Natby, dated 24 June 2026.", "A placement learning plan for Lukas Natby, dated 8 July 2026; 2 pages, complete, signed by the placement supervisor.", "A workplace induction checklist for Lukas Natby, dated 1 August 2026; 2 pages, complete, signed by the induction coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 707}} {"id": "isc-te-00295-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Gormlock BV", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "29 May 2026"}, "checklist": ["Completed annual leave request form, signed", "If the leave requested is longer than 2 weeks, also: extended absence cover plan, signed", "Return to work date confirmation", "Statutory holiday entitlement confirmation", "Manager approval email, issued within the last 2 months", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave, signed", "Team holiday planner extract"], "submission": {"case": {"name": "Alice Gillsall", "reference": "SV-90688", "details": ["The leave requested is longer than two weeks.", "The employee is requesting leave during a known busy period."]}, "documents received": ["Scanned completed annual leave request form for Alice Gillsall, dated 20 April 2026. Single page, signed by the employee.", "Scanned business case for peak-period leave for Alice Gillsall, dated 25 February 2026. 2 pages, complete, signed by the line manager.", "Scanned extended absence cover plan for Alice Gillsall, dated 21 May 2026. 3 pages, complete, signed by the line manager.", "Scanned team holiday planner extract for Alice Gillsall, dated 13 February 2026. 2 pages, complete.", "Scanned manager approval email for Alice Gillsall, dated 20 May 2026. Single page.", "Scanned statutory holiday entitlement confirmation for Alice Gillsall, dated 28 February 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 751}} {"id": "isc-te-00204-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Faldfeld LLP", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "8 May 2026"}, "checklist": ["Refrigerant top-up log, issued within the last 1 month and signed", "Plant room access sign-in sheet", "System pressure test results, issued within the last 1 month and signed", "F-gas leak check record, issued within the last 12 months and signed", "If refrigerant was added during the service, also: refrigerant recovery note, issued within the last 1 month and signed", "Engineer F-gas handling certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "air conditioning system FW-33470", "reference": "JE-34942"}, "documents received": ["F-gas leak check record for air conditioning system FW-33470, issued 9 December 2025, 2 pages, complete. It is signed by the leak check engineer.", "Plant room access sign-in sheet for air conditioning system FW-33470, issued 4 April 2026, 1 page.", "Engineer F-gas handling certificate for air conditioning system FW-33470, showing an expiry date of 12 January 2028, 1 page.", "Refrigerant top-up log for air conditioning system FW-33470, issued 19 April 2026, 1 page. It is signed by the servicing engineer.", "Refrigerant recovery note for air conditioning system FW-33470, issued 5 May 2026, 1 page. It is signed by the recovery engineer.", "System pressure test results for air conditioning system FW-33470, issued 19 April 2026, 2 pages, complete. It is signed by the servicing engineer.", "Thermostat calibration certificate for air conditioning system FW-33470, issued 16 November 2025, 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 842}} {"id": "isc-te-00124-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Gravside LLP", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "20 May 2026"}, "checklist": ["Check the pack includes the public liability insurance schedule.", "Check the pack includes the signed liability claim form.", "Check the pack includes the cleaning log for the day of the incident, issued within the last 6 months and signed.", "If the injured customer was taken to hospital by ambulance, also: check the pack includes the ambulance service record, issued within the last 12 months and signed.", "Check the pack includes the staff training record for the duty manager, issued within the last 24 months and signed.", "Check the pack includes the incident report from the day, issued within the last 3 months and signed.", "Check the pack includes the witness statement from a staff member, signed."], "submission": {"case": {"name": "Marlburg SAS", "reference": "LR-18403", "details": ["The injured customer was taken to hospital by ambulance."]}, "documents received": ["public_liability_insurance_schedule_Marlburg_SAS.pdf. Public liability insurance schedule for Marlburg SAS, dated 19 February 2026. 4 pages, complete.", "witness_statement_staff_member_Marlburg_SAS.pdf. Witness statement from a staff member for Marlburg SAS, dated 8 April 2026, signed by the staff member. Single page.", "liability_claim_form_Marlburg_SAS.pdf. Liability claim form for Marlburg SAS, dated 14 May 2026, signed by the claimant. 3 pages, complete.", "cleaning_log_day_of_incident_Marlburg_SAS.pdf. Cleaning log for the day of the incident for Marlburg SAS, dated 26 December 2025, signed by the cleaner. Single page.", "cctv_footage_stills_incident_Marlburg_SAS.pdf. CCTV footage stills of the incident for Marlburg SAS, dated 11 April 2026. 2 pages, complete.", "staff_training_record_duty_manager_Marlburg_SAS.pdf. Staff training record for the duty manager for Marlburg SAS, dated 14 January 2025, signed by the duty manager. 2 pages, complete.", "photographs_spillage_floor_Marlburg_SAS.pdf. Photographs of the spillage on the floor for Marlburg SAS, dated 1 May 2026. Single page.", "incident_report_Marlburg_SAS.pdf. Incident report from the day for Marlburg SAS, dated 8 May 2026, signed by the duty manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 961}} {"id": "isc-te-00478-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Aldlund GmbH", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "9 September 2026"}, "checklist": ["Impact assessment on the team, signed", "Line manager opinion note, issued within the last 2 months, signed", "Previous flexible working requests record, issued within the last 24 months", "Flexible working request form, signed"], "submission": {"case": {"name": "Adaeze Tibescu", "reference": "CU-27722"}, "documents received": ["impact_assessment_team_adaeze_tibescu.pdf - Impact assessment on the team regarding Adaeze Tibescu, dated 23 May 2026. 3 pages, complete. Signed by the line manager.", "previous_flexible_working_requests_record_adaeze_tibescu.pdf - Previous flexible working requests record regarding Adaeze Tibescu, dated 12 October 2024. 1 page.", "flexible_working_request_form_adaeze_tibescu_scanned.pdf - Flexible working request form regarding Adaeze Tibescu, dated 30 June 2026. 3 pages, complete. The last page is cropped, so the signature block cannot be seen and it is not known whether the form is signed.", "line_manager_opinion_note_adaeze_tibescu.pdf - Line manager opinion note regarding Adaeze Tibescu, dated 3 August 2026. 2 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 701}} {"id": "isc-te-00240-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jarlvik Group", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "8 September 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Travel request form (signed)", "Trip cost estimate (signed)", "Passport copy for international travel (valid (not expired) on the date of the review)", "Hotel booking confirmation", "Line manager approval (signed)", "Visa entry requirement printout (issued within the last 3 months)"], "submission": {"case": {"name": "business trip TW-11432", "reference": "GJ-59230", "details": ["The traveller is not a passport holder of the destination country."]}, "documents received": ["Work permit confirmation. It concerns business trip TW-11432. Date of issue: 9 June 2026. 2 pages, complete.", "Visa entry requirement printout. It concerns business trip TW-11432. Date of issue: 10 July 2026. 2 pages, complete.", "Trip cost estimate. It concerns business trip TW-11432. Date of issue: 5 August 2026. Single page. Signed by the traveller.", "Hotel booking confirmation. It concerns business trip TW-11432. Date of issue: 11 August 2026. 2 pages, complete.", "Passport copy for international travel. It concerns business trip TW-11432. Expiry date: 21 January 2027. Single page.", "Travel request form. It concerns business trip TW-11432. Date of issue: 16 August 2026. 2 pages, complete. Signed by the traveller.", "Line manager approval. It concerns business trip TW-11432. Date of issue: 18 June 2026. Single page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete according to the checklist? Read through all checklist lines that apply to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. The answer complete means every applicable line is met (extra documents do not matter). The answer incomplete means at least one applicable line is not met. The answer unclear means no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; therefore judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-19", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00264-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vaskwyn SAS", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "3 July 2026"}, "checklist": ["If the mobile app release adds a new payment feature, also include: payment provider compliance checklist (issued within the last 3 months, signed)", "Release notes (issued within the last 1 months)", "Crash-free rate report (issued within the last 1 months)", "Marketing screenshot pack", "Age rating questionnaire (signed)", "Device compatibility matrix (issued within the last 3 months)"], "submission": {"case": {"name": "mobile app release GK-82707", "reference": "VU-56351", "details": ["The mobile app release adds no new payment feature."]}, "cover note": "Apologies — this pack was put together in a rush, so please bear with us.", "documents received": ["release_notes_GK-82707.pdf — Release notes for mobile app release GK-82707. Date of issue: 1 July 2026. 2 pages, complete.", "age_rating_questionnaire_GK-82707.pdf — Age rating questionnaire for mobile app release GK-82707. Date of issue: 24 March 2026. 2 pages, complete. Signed by the product owner.", "crash_free_rate_report_GK-82707.pdf — Crash-free rate report for mobile app release GK-82707. Date of issue: 24 June 2026. Single page.", "device_compatibility_matrix_GK-82707.pdf — Device compatibility matrix for mobile app release GK-82707. Date of issue: 30 April 2026. 2 pages, complete.", "privacy_policy_update_GK-82707.pdf — Privacy policy update for mobile app release GK-82707. Date of issue: 28 April 2026. 2 pages, complete.", "document_scan_2026_07_03.pdf — The contents of this file cannot be seen: the scanned pages are blank and too faint to read.", "marketing_screenshots_GK-82707.pdf — Marketing screenshot pack for mobile app release GK-82707. Date of issue: 24 May 2026. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 917}} {"id": "isc-te-00072-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Kenvgate Ltd", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "24 March 2026"}, "checklist": ["Equipment purchase request form, signed.", "Installation requirements note.", "Cost-benefit justification.", "If the equipment uses radioactive sources, also: radiation licence valid (not expired) on the date of the review.", "Training needs assessment, signed.", "Three quotes comparison sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "equipment US-49139", "reference": "LH-38443", "details": ["The equipment uses radioactive sources."]}, "documents received": ["Scanned three quotes comparison sheet for equipment US-49139, dated 13 January 2026, signed by the procurement officer. Single page.", "Scanned equipment purchase request form for equipment US-49139, dated 23 January 2026, signed by the requesting department head. 2 pages, complete.", "Scanned installation requirements note for equipment US-49139, dated 7 December 2025. 2 pages, complete.", "Scanned training needs assessment for equipment US-49139, dated 12 February 2026, signed by the training coordinator. Single page.", "Scanned radiation licence for equipment US-49139, showing an expiry date of 29 January 2028. Single page.", "Scanned three quotes comparison sheet for equipment US-49139, dated 29 April 2024, signed by the procurement officer. Single page.", "Scanned cost-benefit justification for equipment US-49139, dated 8 December 2025. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "You are deciding whether the pack is complete when checked against the checklist. Go through every checklist line that applies to this case. Only if a required document is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows does it count. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves must be judged.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-58", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 793}} {"id": "isc-te-00201-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Cindwell & Co", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "16 September 2026"}, "checklist": ["Engineer's service report, issued within the last 1 month, signed", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "Refrigerant top-up log, issued within the last 1 month, signed", "Plant room access sign-in sheet", "F-gas leak check record, issued within the last 12 months, signed", "Asset condition photograph sheet, issued within the last 1 month", "If refrigerant was added during the service, also: refrigerant recovery note, issued within the last 1 month, signed"], "submission": {"case": {"name": "air conditioning system YE-45954", "reference": "YI-92981", "details": ["Refrigerant was added during the service."]}, "documents received": ["Plant room access sign-in sheet for air conditioning system YE-45954, dated 22 July 2026. Single page.", "Engineer F-gas handling certificate for air conditioning system YE-45954, with expiry date 12 July 2028. Single page.", "F-gas leak check record for air conditioning system YE-45954, dated 18 June 2026. 2 pages, complete. Signed by the leak check engineer.", "Refrigerant recovery note for air conditioning system YE-45954, dated 26 August 2026. Single page. Signed by the service engineer.", "Asset condition photograph sheet for air conditioning system YE-45954, dated 2 September 2026. 2 pages, complete.", "Electrical safety certificate for the engineer, covering air conditioning system YE-45954, with expiry date 12 July 2028. Single page.", "Refrigerant top-up log for air conditioning system YE-45954, dated 11 September 2026. Single page. Signed by the service engineer.", "Engineer's service report for air conditioning system YE-45954, dated 13 September 2026. 3 pages, complete. Signed by the service engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 902}} {"id": "isc-te-00044-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Abrmouth Partners", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "2 April 2026"}, "checklist": ["Utilities connection certificate on file.", "Warehouse insurance policy on file, valid (not expired) on the date of the review.", "Planning permission on file.", "Signed lease agreement on file, signed.", "Racking inspection report on file, issued within the last 12 months and signed.", "If the warehouse site is in a flood risk area, also: flood risk assessment, signed.", "Fire safety certificate on file, valid (not expired) on the date of the review."], "submission": {"case": {"name": "warehouse UE-7753", "reference": "YO-81533", "details": ["The warehouse site is in a flood risk area."]}, "documents received": ["Signed lease agreement for warehouse UE-7753. Date of issue: 6 January 2026. 8 pages, complete. Signed by the landlord and the tenant.", "Racking inspection report for warehouse UE-7753. Date of issue: 12 July 2025. 2 pages, complete. Signed by the racking inspector.", "Utilities connection certificate for warehouse UE-7753. Date of issue: 8 December 2025. Single page.", "Planning permission for warehouse UE-7753. Date of issue: 24 February 2026. 2 pages, complete.", "Fire safety certificate for warehouse UE-7753. Expiry date: 29 November 2026. 2 pages, complete.", "Warehouse insurance policy for warehouse UE-7753. Expiry date: 14 April 2027. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack is complete per the checklist. Go over every checklist line that applies to this case. Only a document of the listed kind counts (not a similar one), and it must be about the case's subject, have all its pages, be signed wherever the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: at least one applicable line is not satisfied. unclear: no line is clearly not met, but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-9", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 773}} {"id": "isc-te-00047-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Teskbrook GmbH", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "17 March 2026"}, "checklist": ["Check that the audit summary report is present and signed.", "Check that the audit finding sheets are present and signed.", "Check that the internal audit plan is present, was issued within the last 12 months, and is signed.", "Check that the management review minutes are present and signed.", "If the audit found a major non-conformity, also check that the major non-conformity corrective action plan is present and signed."], "submission": {"case": {"name": "internal audit HH-1805", "reference": "IG-20637", "details": ["The audit found a major non-conformity."]}, "documents received": ["Major non-conformity corrective action plan HH-1805. Issued 10 December 2025, 3 pages, complete. Signed by the quality manager.", "Management review minutes HH-1805. Issued 13 February 2026, 4 pages, complete. Signed by the chair of the review board.", "Audit summary report HH-1805. Issued 3 February 2026, 5 pages, complete. Signed by the lead auditor.", "Internal audit plan HH-1805. Issued 7 March 2025, 2 pages, complete. Signed by the quality manager.", "Audit finding sheets HH-1805. Issued 1 January 2026, 2 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 741}} {"id": "isc-te-00063-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ivrby Partners", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "15 July 2026"}, "checklist": ["Certificate of insurance, valid (not expired) on the date of the review.", "Supplier registration form, signed.", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed.", "Bank details confirmation letter, issued within the last 3 months, signed.", "Anti-bribery policy statement, signed.", "Company tax clearance certificate, valid (not expired) on the date of the review.", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid (not expired) on the date of the review."], "submission": {"case": {"name": "Corvcrest Ltd", "reference": "QW-68059", "details": ["The supplier is a domestic company.", "The supplier is a small business with a single owner."]}, "cover note": "Please find attached the supplier onboarding pack for Corvcrest Ltd, reference QW-68059. Everything needed is attached and complete. Please review it when you can.", "documents received": ["Copy of the owner's photo identification for Corvcrest Ltd. It shows an expiry date of 9 February 2028 and is a single page.", "Supplier registration form for Corvcrest Ltd. It is dated 24 April 2026 and is signed by an authorised representative of the supplier. 3 pages, complete.", "Bank details confirmation letter for Corvcrest Ltd. It is dated 20 June 2026, is a single page, and is signed by the supplier's finance manager.", "Company tax clearance certificate for Corvcrest Ltd. It shows an expiry date of 29 December 2026 and is a single page.", "Certificate of insurance for Corvcrest Ltd. It shows an expiry date of 18 July 2028. Pages 1 to 2 are included and the total number of pages is not shown anywhere on it.", "Anti-bribery policy statement for Corvcrest Ltd. It is dated 22 June 2026 and is signed by an authorised representative of the supplier. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 881}} {"id": "isc-te-00195-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Pellside LLP", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "3 March 2026"}, "checklist": ["Authorised representative ID copy, valid (not expired) on the date of the review", "Tax registration letter", "Anti-money laundering questionnaire, signed", "Proof of trading address, issued within the last 3 months", "If the seller intends to list food or cosmetic products, also: safety compliance certificate, issued within the last 12 months", "Business registration certificate", "Product catalogue declaration, signed", "If the seller is a sole trader rather than a company, also: sole trader statutory declaration, signed"], "submission": {"case": {"name": "Quelmouth Inc", "reference": "JT-56871", "details": ["The seller intends to list food or cosmetic products.", "The seller is a sole trader rather than a company."]}, "documents received": ["tax_registration_letter.pdf — Tax registration letter for Quelmouth Inc. The date of issue is 7 January 2026. 1 page.", "business_registration_certificate.pdf — Business registration certificate for Quelmouth Inc. The date of issue is 9 January 2026. 1 page.", "safety_compliance_certificate.pdf — Safety compliance certificate for Quelmouth Inc. The date of issue is 17 September 2025. 2 pages, complete.", "product_catalogue_declaration.pdf — Product catalogue declaration for Quelmouth Inc. The date of issue is 16 February 2026. 4 pages, complete. It is signed by the authorised representative.", "proof_of_trading_address.pdf — Proof of trading address for Quelmouth Inc. The date of issue is 7 February 2026. 1 page.", "anti_money_laundering_questionnaire.pdf — Anti-money laundering questionnaire for Quelmouth Inc. The date of issue is 18 January 2026. 3 pages, complete. It is signed by the authorised representative.", "scan_0417.pdf — The file will not open, so the contents cannot be seen.", "sole_trader_statutory_declaration.pdf — Sole trader statutory declaration for Quelmouth Inc. The date of issue is 11 November 2025. 1 page. It is signed by the seller.", "bank_account_verification_letter.pdf — Bank account verification letter for Quelmouth Inc. The date of issue is 27 December 2025. 1 page. It is signed by the bank.", "authorised_representative_ID_copy.pdf — Authorised representative ID copy for Quelmouth Inc. The expiry date shown is 6 March 2027. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 8, "n_conditional": 2, "n_documents": 10, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 965}} {"id": "isc-te-00462-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Xanholm LLP", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "17 August 2026"}, "checklist": ["Account statement showing recent activity, issued within the last 1 months", "Photo identification, valid (not expired) on the date of the review", "Fraud questionnaire, signed", "Card replacement request form, signed", "Confirmation of contact details, issued within the last 3 months", "Lost card declaration, signed"], "submission": {"case": {"name": "Rory Tibow", "reference": "DN-27132"}, "documents received": ["Account statement showing recent activity.pdf. This account statement showing recent activity for Rory Tibow is dated 7 August 2026. 3 pages, complete.", "Card replacement request form.pdf. This card replacement request form for Rory Tibow is dated 25 May 2026. 2 pages, complete. It is signed by the cardholder.", "Fraud questionnaire.pdf. This fraud questionnaire for Rory Tibow is dated 8 July 2026. 2 pages, complete. It is signed by the cardholder.", "Lost card declaration.pdf. This lost card declaration for Rory Tibow is dated 26 June 2026. It is a single page. It is signed by the cardholder.", "Confirmation of contact details.pdf. This confirmation of contact details for Rory Tibow is dated 8 February 2026. It is a single page.", "Photo identification.pdf. This photo identification for Rory Tibow shows an expiry date of 16 October 2027. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 736}} {"id": "isc-te-00237-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Baxside Limited", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "16 March 2026"}, "checklist": ["Bank interest statement issued within the last 13 months", "Pension contribution certificate issued within the last 13 months", "Capital gains asset record", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Tax return draft printout, signed", "Childcare payment receipt issued within the last 13 months"], "submission": {"case": {"name": "household tax affairs MV-6666", "reference": "AI-52954", "details": ["The household sold no property other than its main home during the tax year."]}, "documents received": ["childcare-payment-receipt-MV-6666-26feb2025.pdf - Childcare payment receipt for household tax affairs MV-6666. Date of issue: 26 February 2025. Single page.", "bank-interest-statement-MV-6666.pdf - Bank interest statement for household tax affairs MV-6666. Date of issue: 25 January 2026. 3 pages, complete.", "employment-income-summary-MV-6666.pdf - Employment income summary for household tax affairs MV-6666. Date of issue: 17 March 2025. 2 pages, complete.", "tax-return-draft-printout-MV-6666.pdf - Tax return draft printout for household tax affairs MV-6666. Date of issue: 8 December 2025. 6 pages, complete. Signed by the filer.", "pension-contribution-certificate-MV-6666.pdf - Pension contribution certificate for household tax affairs MV-6666. Date of issue: 26 January 2026. 2 pages, complete.", "capital-gains-asset-record-MV-6666.pdf - Capital gains asset record for household tax affairs MV-6666. Date of issue: 28 December 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00460-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Cindhaven Limited", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "17 September 2026"}, "checklist": ["Check that a signed board resolution to open the account is included.", "Check that the certificate of incorporation is included.", "Check that proof of registered office address is included, issued within the last 3 months.", "Check that the signed company statutes are included.", "Check that a shareholder register extract is included, issued within the last 3 months.", "Check that the company tax registration certificate is included.", "If the company has a non-resident beneficial owner, also check that the apostilled incorporation documents are included."], "submission": {"case": {"name": "Urvlund Partners", "reference": "YW-82009", "details": ["The company has a non-resident beneficial owner."]}, "documents received": ["Scanned beneficial owner identification form for Urvlund Partners, dated 3 June 2026. 3 pages, complete, signed by the compliance officer.", "Scanned company tax registration certificate for Urvlund Partners, dated 9 August 2026. Single page.", "Scanned apostilled incorporation documents for Urvlund Partners, dated 7 July 2026. 4 pages, complete.", "Scanned company statutes for Urvlund Partners, dated 1 August 2026. 12 pages, complete, signed by the secretary.", "Scanned shareholder register extract for Urvlund Partners, dated 17 August 2026. 2 pages, complete.", "Scanned proof of registered office address for Urvlund Partners, dated 8 July 2026. Single page.", "Scanned certificate of incorporation for Urvlund Partners, dated 15 August 2026. Single page.", "Scanned authorised signer identity document for Urvlund Partners, expiring 21 April 2028. Single page.", "Scanned board resolution to open the account for Urvlund Partners, dated 21 May 2026. Single page, signed by the chair of the board."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00115-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Prydwyn LLP", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "7 April 2026"}, "checklist": ["Previous grievance outcome letter, issued within the last 24 months", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed", "Meeting invitation with rights explained, issued within the last 1 months", "Adjustment request record, issued within the last 3 months, signed", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed", "Witness list, signed", "Investigator appointment letter, issued within the last 3 months", "Grievance procedure acknowledgement, issued within the last 3 months, signed"], "submission": {"case": {"name": "Helen Zellcombe", "reference": "JL-16752", "details": ["The grievance makes no allegation of bullying.", "The grievance is against the employee's direct manager."]}, "documents received": ["Alternative manager reporting line note concerning Helen Zellcombe, dated 28 December 2025. 1 page. Signed by the alternative manager.", "Adjustment request record concerning Helen Zellcombe, dated 10 March 2026. 1 page. Signed by the employee.", "Meeting invitation with rights explained concerning Helen Zellcombe, dated 5 April 2026. 1 page.", "Evidence bundle index concerning Helen Zellcombe, dated 14 March 2026. 2 pages, complete. Signed by the case handler.", "Previous grievance outcome letter concerning Helen Zellcombe, dated 19 December 2024. 2 pages, complete.", "Investigator appointment letter concerning Helen Zellcombe, dated 2 April 2026. 1 page.", "Witness list concerning Helen Zellcombe, dated 1 April 2026. 1 page. Signed by the case handler."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00333-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Iskwald Limited", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "3 April 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed.", "Anti-bribery policy statement, signed.", "Certificate of insurance, valid (not expired) on the date of the review.", "Signed copy of the general terms and conditions, signed."], "submission": {"case": {"name": "Dundfeld Ltd", "reference": "GD-75611"}, "documents received": ["Bank details confirmation letter for Dundfeld Ltd, dated 14 January 2026. Single page. Signed by a bank officer.", "Signed copy of the general terms and conditions for Dundfeld Ltd, dated 10 March 2026. 6 pages, complete. Signed by a company director.", "Certificate of insurance for Dundfeld Ltd, expiring 24 January 2028. 2 pages, complete.", "Anti-bribery policy statement for Dundfeld Ltd, dated 22 January 2026. Page 1 of an unstated total is included. Signed by a company director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 640}} {"id": "isc-te-00424-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ambside & Co", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "15 May 2026"}, "checklist": ["visa entry requirement printout, issued within the last 3 months", "flight itinerary quote, issued within the last 1 months", "line manager approval, signed", "If the trip involves travel to a country requiring a visa, also: visa approval letter", "trip cost estimate, signed", "passport copy for international travel, valid (not expired) on the date of the review"], "submission": {"case": {"name": "business trip QQ-26801", "reference": "UK-40834"}, "documents received": ["passport_copy_QQ-26801.pdf. This is a passport copy for international travel for business trip QQ-26801, showing an expiry date of 19 September 2027. It is a single page.", "travel_request_form_QQ-26801.pdf. This is a travel request form for business trip QQ-26801, showing a date of issue of 27 March 2026. 2 pages, complete. It is signed by the employee.", "flight_itinerary_quote_QQ-26801.pdf. This is a flight itinerary quote for business trip QQ-26801, showing a date of issue of 1 May 2026. 2 pages, complete.", "visa_entry_requirement_printout_QQ-26801.pdf. This is a visa entry requirement printout for business trip QQ-26801, showing a date of issue of 3 April 2026. 2 pages, complete.", "trip_cost_estimate_QQ-26801.pdf. This is a trip cost estimate for business trip QQ-26801, showing a date of issue of 6 April 2026. It is a single page, signed by the travel coordinator.", "line_manager_approval_QQ-26801.pdf. This is a line manager approval for business trip QQ-26801, showing a date of issue of 29 January 2026. It is a single page, signed by the line manager."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 684}} {"id": "isc-te-00023-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Aldvik Limited", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "17 August 2026"}, "checklist": ["Engineer F-gas handling certificate, valid (not expired) on the date of the review.", "Engineer's service report, issued within the last 1 months, signed.", "Asset condition photograph sheet, issued within the last 1 months.", "Plant room access sign-in sheet.", "F-gas leak check record, issued within the last 12 months, signed.", "System pressure test results, issued within the last 1 months, signed."], "submission": {"case": {"name": "air conditioning system TH-31121", "reference": "TH-69673"}, "documents received": ["Engineer's service report for air conditioning system TH-31121, issued on 6 August 2026. 3 pages, complete. Signed by the service engineer.", "System pressure test results for air conditioning system TH-31121, issued on 1 August 2026. Pages 1-1 of 2 only are included. Signed by the test engineer.", "Refrigerant top-up log for air conditioning system TH-31121, issued on 28 July 2026. Single page. Signed by the refrigerant handling engineer.", "Engineer F-gas handling certificate for air conditioning system TH-31121, showing an expiry date of 13 March 2027. Single page.", "F-gas leak check record for air conditioning system TH-31121, issued on 10 November 2025. 2 pages, complete. Signed by the attending engineer.", "Plant room access sign-in sheet for air conditioning system TH-31121, issued on 31 July 2026. Single page.", "Asset condition photograph sheet for air conditioning system TH-31121, issued on 3 August 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 838}} {"id": "isc-te-00409-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Jundwald Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "28 August 2026"}, "checklist": ["Audit finding sheets, signed", "Audit attendance sheet, signed", "Previous audit follow-up record, issued within the last 24 months, signed", "Audit interview notes, signed", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list, signed"], "submission": {"case": {"name": "internal audit AM-70822", "reference": "KP-15972"}, "cover note": "Please find the evidence pack for internal audit AM-70822 for your review at the management review on 28 August 2026. A colleague has already checked this pack. Please let me know if you need anything further. Aoife Paskden", "documents received": ["Previous audit follow-up record AM-70822.pdf. Dated 16 October 2025, this record covers the follow-up actions from internal audit AM-70822. 2 pages, complete. It is signed by the quality manager.", "Audit attendance sheet AM-70822.pdf. This single page, dated 16 August 2026, lists those present at internal audit AM-70822. It is signed by the lead auditor.", "Audit finding sheets AM-70822.pdf. Dated 5 July 2026, the sheets record the findings of internal audit AM-70822. 2 pages, complete. Each sheet is signed by the lead auditor.", "Internal audit plan AM-70822.pdf. Dated 21 June 2026, this plan sets out the scope and schedule of internal audit AM-70822. 2 pages, complete. It is signed by the quality manager.", "Audit interview notes AM-70822.pdf. These notes, dated 26 June 2026, cover the interviews held during internal audit AM-70822. 3 pages, complete. They are signed by the auditor who conducted the interviews."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 858}} {"id": "isc-te-00225-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Haskmark Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "29 July 2026"}, "checklist": ["Certified quality management system certificate, valid (not expired) on the date of the review.", "Supplier corrective action plan, issued within the last 6 months and signed.", "Supplier audit report, issued within the last 24 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed.", "Raw material certificate of analysis, issued within the last 6 months and signed."], "submission": {"case": {"name": "Jaskfield LLP", "reference": "PX-41794"}, "documents received": ["Supplier audit report for Jaskfield LLP, dated 28 July 2025. 8 pages, complete. Signed by the lead auditor.", "Financial stability statement for Jaskfield LLP, dated 29 April 2026. 2 pages, complete. Signed by the supplier's finance director.", "Raw material certificate of analysis for Jaskfield LLP, dated 26 March 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Supplier capacity declaration for Jaskfield LLP, dated 16 July 2026. 2 pages, complete. Signed by the supplier's operations director.", "Certified quality management system certificate for Jaskfield LLP, showing an expiry date of 29 November 2028. Single page.", "Supplier quality questionnaire for Jaskfield LLP, dated 16 July 2026. 4 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 741}} {"id": "isc-te-00293-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Glenford GmbH", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "14 April 2026"}, "checklist": ["If the job involves working at height above 2 metres, also: permit to work at height (issued within the last 1 months, signed)", "If the job will take place in an occupied office, also: occupier notification letter (issued within the last 1 months, signed)", "access authorisation slip (signed)", "cost estimate (issued within the last 3 months, signed)", "location details sheet", "photographs of the fault (issued within the last 3 months)"], "submission": {"case": {"name": "maintenance request JO-3858", "reference": "WB-64559", "details": ["The job involves working at height above two metres.", "The job will take place in an occupied office."]}, "documents received": ["Access authorisation slip. The slip relates to maintenance request JO-3858 and shows its date of issue as 2 January 2026. It is 1 page and carries the signature of the site access controller.", "Permit to work at height. The permit relates to maintenance request JO-3858 and shows its date of issue as 2 April 2026. It is 1 page and carries the signature of the authorising manager.", "Occupier notification letter. The letter concerns maintenance request JO-3858 and shows its date of issue as 6 April 2026. It is 1 page and is signed by the facilities coordinator.", "Location details sheet. The sheet covers maintenance request JO-3858 and shows its date of issue as 5 February 2026. It is 1 page.", "Photographs of the fault. The photographs relate to maintenance request JO-3858 and show their date of issue as 25 March 2026. It is 2 pages, complete.", "Cost estimate. The estimate is for maintenance request JO-3858 and shows its date of issue as 29 January 2026. It is 2 pages, complete, and is signed by the estimating surveyor."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide if it is complete. Check every checklist line that is applicable to this case. A required document only counts if it is the kind of document that the checklist lists (not a similar kind), if it is about the subject of the case, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the review date, and if it was issued within the period the checklist allows. A conditional line applies only in cases where its circumstance holds. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves instead.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-56", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 877}} {"id": "isc-te-00328-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Ebrmont BV", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "30 April 2026"}, "checklist": ["Three most recent payslips, issued within the last 3 months.", "Passport, valid (not expired) on the date of the review.", "Three months of bank statements, issued within the last 3 months.", "Gifted deposit letter, issued within the last 3 months and signed.", "Property valuation report, issued within the last 3 months and signed."], "submission": {"case": {"name": "Jonas Radton", "reference": "OO-69836"}, "documents received": ["Three months of bank statements for Jonas Radton, issued on 24 February 2026. 9 pages, complete.", "Three most recent payslips for Jonas Radton, dated 2 March 2026. 3 pages, complete.", "Property valuation report for Jonas Radton, dated 26 March 2026. 8 pages, complete. The signature line is empty, so the report is not signed.", "Passport for Jonas Radton, showing an expiry date of 31 August 2027. 2 pages, complete.", "P60 tax summary for Jonas Radton, dated 15 April 2026. 2 pages, complete.", "Gifted deposit letter for Jonas Radton, dated 16 April 2026. 1 page, signed by the donor of the gift."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? That is the question to answer. Work through all checklist lines that bear on this case. For a required document to be counted, it must be the kind of document listed on the checklist (a similar document will not suffice), it must be about the case's subject, it must have all its pages present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued inside the period the checklist allows. A conditional line applies only when the circumstance it sets out holds for the case. complete: every applicable line is met, and extra documents are irrelevant. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one line cannot be decided from what is shown, for example when a needed date, signature or page count is not visible, when a document's kind cannot be told, or when the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-54", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 742}} {"id": "isc-te-00352-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Nordston GmbH", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "4 March 2026"}, "checklist": ["If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter (issued within the last 3 months, signed)", "remediation items list (issued within the last 3 months, signed)", "follow-up owner assignment sheet (issued within the last 3 months, signed)", "root cause analysis report (issued within the last 3 months, signed)", "alerting rules review note (issued within the last 3 months)", "customer impact statement (issued within the last 3 months)", "postmortem meeting minutes (issued within the last 3 months, signed)"], "submission": {"case": {"name": "production incident MC-46081", "reference": "MU-34394", "details": ["The incident was caused by a third-party service outage."]}, "documents received": ["Alerting rules review note for production incident MC-46081, dated 15 February 2026. It is 2 pages, complete.", "Follow-up owner assignment sheet for production incident MC-46081, dated 3 January 2026. It is 1 page and is signed by the incident manager.", "Postmortem meeting minutes for production incident MC-46081, dated 7 February 2026. It is 3 pages, complete, and is signed by the meeting chair.", "Remediation items list for production incident MC-46081, dated 2 March 2026. It is 2 pages, complete, and is signed by the remediation lead.", "Root cause analysis report for production incident MC-46081, dated 7 February 2026. It is 5 pages, complete, and is signed by the lead reliability engineer.", "Customer impact statement for production incident MC-46081. The date of issue is smudged and cannot be read. It is 2 pages, complete.", "Vendor outage acknowledgement letter for production incident MC-46081, dated 15 February 2026. It is 1 page and is signed by the vendor's service manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 878}} {"id": "isc-te-00482-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Delvcrest plc", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "24 April 2026"}, "checklist": ["Check the pack contains the purchase invoice for the machine.", "Check the pack contains the machine maintenance log, issued within the last 6 months.", "If the breakdown spoiled perishable stock, also: spoiled stock disposal certificate, issued within the last 3 months, signed.", "Check the pack contains the repair or replacement quotation, issued within the last 3 months.", "Check the pack contains the policy machinery schedule.", "If a temporary machine was hired to keep production going, also: temporary hire agreement for replacement machinery, issued within the last 3 months, signed."], "submission": {"case": {"name": "failed machine TK-72580", "reference": "JA-96370", "details": ["The breakdown spoiled no perishable stock.", "No temporary machine was hired to keep production going."]}, "documents received": ["Repair or replacement quotation for failed machine TK-72580. Dated 22 February 2026. 2 pages, complete.", "Policy machinery schedule for failed machine TK-72580. Dated 29 March 2026. 3 pages, complete.", "Purchase invoice for the machine failed machine TK-72580. Dated 9 February 2026. 1 page.", "Engineer's fault diagnosis report for failed machine TK-72580. Dated 16 April 2026. 4 pages, complete. Signed by the inspecting engineer.", "Machine maintenance log for failed machine TK-72580. Dated 15 October 2025. 5 pages, complete."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 579}} {"id": "isc-te-00090-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Uldvale LLP", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "27 April 2026"}, "checklist": ["Asset register update, issued within the last 1 months.", "Decommission request form, signed.", "Final backup confirmation, issued within the last 3 months, signed.", "Data migration confirmation, issued within the last 3 months, signed.", "Dependent systems check report, issued within the last 3 months.", "Licence reassignment note, issued within the last 3 months, signed.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server HC-85039", "reference": "XH-31889", "details": ["The server holds archived records that must be kept."]}, "documents received": ["File named scan_0427_009.pdf. The file will not open, so its contents cannot be seen.", "Data migration confirmation for retired server HC-85039, dated 25 March 2026. 2 pages, complete. Signed by the systems migration lead.", "Archive retention confirmation for retired server HC-85039, dated 28 March 2026. 2 pages, complete. Signed by the records manager.", "Asset register update for retired server HC-85039, dated 15 April 2026. Single page.", "Licence reassignment note for retired server HC-85039, dated 23 March 2026. Single page. Signed by the software licence administrator.", "Final backup confirmation for retired server HC-85039, dated 26 March 2026. Single page. Signed by the backup administrator.", "Decommission request form for retired server HC-85039, dated 5 January 2026. 2 pages, complete. Signed by the infrastructure operations team lead.", "Network disconnection confirmation for retired server HC-85039, dated 20 April 2026. Single page. Signed by the network operations engineer.", "Dependent systems check report for retired server HC-85039, dated 21 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 903}} {"id": "isc-te-00061-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pelllund Partners", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "24 July 2026"}, "checklist": ["Quality inspection report, issued within the last 6 months and signed", "Supplier performance scorecard, signed", "Corrective action plan, issued within the last 6 months and signed", "If the supplier is being considered for an expanded scope, also: expanded scope assessment memo, signed", "If the supplier missed the agreed service levels, also: service credit request form, signed", "Service level summary, issued within the last 12 months", "Contract compliance checklist, signed", "Delivery record summary, issued within the last 12 months"], "submission": {"case": {"name": "Pravheim Limited", "reference": "ZV-43025", "details": ["The supplier is being considered for an expanded scope.", "The supplier met all agreed service levels."]}, "documents received": ["Service level summary about Pravheim Limited, dated 10 February 2026. Single page.", "Contract compliance checklist about Pravheim Limited, dated 8 July 2026. 3 pages, complete. Signed by the contract manager.", "Expanded scope assessment memo about Pravheim Limited, dated 6 May 2026. 2 pages, complete. Signed by the procurement manager.", "Corrective action plan about Pravheim Limited, dated 21 April 2026. 2 pages, complete. Signed by the supplier quality lead.", "General factory tour handout about Pravheim Limited, dated 25 February 2026. 3 pages, complete. Signed by the site tour coordinator.", "Delivery record summary about Pravheim Limited, dated 12 October 2025. 2 pages, complete.", "Supplier performance scorecard about Pravheim Limited, dated 13 June 2026. 2 pages, complete. Signed by the supplier relationship manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete according to the checklist? Read through all checklist lines that apply to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. The answer complete means every applicable line is met (extra documents do not matter). The answer incomplete means at least one applicable line is not met. The answer unclear means no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; therefore judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-19", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00064-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Rondgard Ltd", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "8 June 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Visa entry requirement printout (issued within the last 3 months)", "Travel request form (signed)", "Flight itinerary quote (issued within the last 1 months)", "Hotel booking confirmation"], "submission": {"case": {"name": "business trip WO-61646", "reference": "UY-28386"}, "documents received": ["Passport copy for international travel for business trip WO-61646. It shows an expiry date of 27 June 2027. It is a single page.", "Flight itinerary quote for business trip WO-61646. It shows a date of issue of 28 May 2026. 2 pages, complete.", "Visa entry requirement printout for business trip WO-61646. It shows a date of issue of 14 May 2026. 2 pages, complete.", "Travel request form for business trip WO-61646. It shows a date of issue of 17 February 2026. 2 pages, complete. It is signed by the line manager.", "Hotel booking confirmation for business trip WO-61646. It shows a date of issue of 25 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 526}} {"id": "isc-te-00175-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Selvlund SAS", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "2 July 2026"}, "checklist": ["Check that the expense claim form is signed.", "If the claim exceeds the limit that requires director sign-off, also: check for a director approval slip issued within the last 3 months and signed.", "Check for a train ticket receipt.", "Check for a conference fee invoice issued within the last 12 months.", "Check for a currency conversion statement issued within the last 6 months."], "submission": {"case": {"name": "Sarah Quillley", "reference": "FZ-65007", "details": ["The claim is below the limit requiring director sign-off."]}, "cover note": "I am not sure that everything needed is included in this pack. Please let me know if anything should be added.", "documents received": ["Hotel invoice - Sarah Quillley.pdf - A hotel invoice for Sarah Quillley, dated 30 May 2026. 2 pages, complete.", "Currency conversion statement - Sarah Quillley.pdf - A single-page currency conversion statement for Sarah Quillley, dated 21 April 2026.", "Conference fee invoice - Sarah Quillley.pdf - A single-page conference fee invoice for Sarah Quillley, dated 14 December 2025.", "Expense claim form - Sarah Quillley.pdf - A 2-page expense claim form for Sarah Quillley, dated 17 May 2026. 2 pages, complete. It has been signed by Sarah Quillley.", "Train ticket receipt - Sarah Quillley.pdf - A single-page train ticket receipt for Sarah Quillley, dated 4 April 2026.", "Restaurant receipt - Sarah Quillley.pdf - A single-page restaurant receipt for Sarah Quillley, dated 19 February 2026."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist. Go through every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete if every applicable line is met (extra documents do not matter). Choose incomplete if at least one applicable line is not met. Choose unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-30", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00125-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Fravberg LLP", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "6 April 2026"}, "checklist": ["Check for a signed stamp duty return.", "Check for a company search report issued within the last 1 months.", "If the lease term is longer than seven years, also check for a signed land registration application.", "Check for a signed guarantor consent letter.", "If the tenant is a newly formed company, also check for a signed parent company guarantee (signed).", "Check for a signed draft lease."], "submission": {"case": {"name": "premises AA-3696", "reference": "GR-61853", "details": ["The lease term is longer than seven years.", "The tenant is a newly formed company."]}, "documents received": ["Stamp duty return - premises AA-3696.pdf — Stamp duty return for premises AA-3696, dated 8 January 2026. 2 pages, complete. Signed by the tenant.", "Parent company guarantee - premises AA-3696.pdf — Signed parent company guarantee for premises AA-3696, dated 1 January 2026. 3 pages, complete. Signed by a director of the parent company.", "Company search report - premises AA-3696.pdf — Company search report for premises AA-3696, dated 26 March 2026. 2 pages, complete.", "Land registration application - premises AA-3696.pdf — Land registration application for premises AA-3696, dated 3 January 2026. 2 pages, complete. Signed by the landlord's solicitor.", "Draft lease - premises AA-3696.pdf — Signed draft lease for premises AA-3696, dated 18 December 2025. 12 pages, complete. Signed by the landlord and the tenant.", "Guarantor consent letter - premises AA-3696.pdf — Guarantor consent letter for premises AA-3696, dated 2 March 2026. 1 page. Signed by the guarantor."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 661}} {"id": "isc-te-00004-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Arvhaven Inc", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "26 June 2026"}, "checklist": ["Risk assessment, issued within the last 3 months and signed", "Business justification memo, issued within the last 3 months and signed", "Proposed rule change specification, signed", "Firewall change request form, signed", "If the change opens a new inbound connection from the internet, also: internet exposure review certificate, issued within the last 1 months and signed"], "submission": {"case": {"name": "firewall change XI-19991", "reference": "SY-92295", "details": ["The change opens a new inbound connection from the internet."]}, "documents received": ["Business justification memo for firewall change XI-19991, dated 10 June 2026, single page. Signed by the requesting business owner.", "Proposed rule change specification for firewall change XI-19991, dated 18 April 2026, 2 pages, complete. Signed by the network engineer.", "Risk assessment for firewall change XI-19991, dated 20 April 2026, 2 pages, complete. Signed by the network security lead.", "Peer review checklist for firewall change XI-19991, dated 19 June 2026, single page. Signed by the reviewing network engineer.", "Firewall change request form for firewall change XI-19991, dated 1 June 2026, 3 pages, complete. Signed by the requesting business owner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 737}} {"id": "isc-te-00151-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ivrlund BV", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "12 May 2026"}, "checklist": ["Line manager approval, signed.", "Flight itinerary quote, issued within the last 1 months.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Hotel booking confirmation.", "Travel request form, signed.", "If the traveller is not a passport holder of the destination country, also: work permit confirmation.", "Travel policy acknowledgement, signed."], "submission": {"case": {"name": "business trip JP-14209", "reference": "DD-15730", "details": ["The traveller holds a passport of the destination country."]}, "documents received": ["Travel-policy-acknowledgement-JP-14209.pdf. A single-page travel policy acknowledgement for business trip JP-14209, issued on 27 April 2026. It carries the signature of the traveller.", "Hotel-booking-confirmation-JP-14209.pdf. A hotel booking confirmation for business trip JP-14209, issued on 15 March 2026. 2 pages, complete.", "Boarding-pass-JP-14209.pdf. A boarding pass from an earlier trip, for business trip JP-14209, issued on 3 May 2026. 2 pages, complete.", "Trip-cost-estimate-JP-14209.pdf. A single-page trip cost estimate for business trip JP-14209, issued on 12 April 2026. It is signed by the travel coordinator.", "Line-manager-approval-JP-14209.pdf. A single-page line manager approval for business trip JP-14209, issued on 11 April 2026. It carries the signature of the line manager.", "Travel-request-form-JP-14209.pdf. A travel request form for business trip JP-14209, issued on 21 March 2026. 2 pages, complete. It is signed by the traveller.", "Passport-copy-JP-14209.pdf. A single-page passport copy for international travel for business trip JP-14209, showing an expiry date of 8 December 2027."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 907}} {"id": "isc-te-00452-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Bravhaven Inc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "12 August 2026"}, "checklist": ["Leaver notification form, signed.", "Final payroll cut-off note, signed, issued within the last 1 months.", "Line manager confirmation, signed, issued within the last 1 months.", "Shared mailbox handover record, signed, issued within the last 1 months.", "Access rights inventory, issued within the last 1 months.", "Service desk ticket closure summary, issued within the last 1 months."], "submission": {"case": {"name": "Andrew Vellcombe", "reference": "CI-98740"}, "documents received": ["Final payroll cut-off note for Andrew Vellcombe, dated 22 July 2026. Single page. Signed by the payroll officer.", "Line manager confirmation for Andrew Vellcombe, dated 26 July 2026. Single page. Signed by the line manager.", "Leaver notification form for Andrew Vellcombe, dated 3 May 2026. 2 pages, complete. Signed by the line manager.", "Shared mailbox handover record for Andrew Vellcombe, dated 31 July 2026. 2 pages, complete. Signed by the shared mailbox administrator.", "Non-disclosure reminder acknowledgement for Andrew Vellcombe, dated 8 June 2026. Single page. Signed by the departing employee.", "Service desk ticket closure summary for Andrew Vellcombe, dated 17 July 2026. 3 pages, complete.", "Access rights inventory for Andrew Vellcombe, dated 24 July 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 761}} {"id": "isc-te-00093-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Gravwick Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "25 May 2026"}, "checklist": ["Proposed rule change specification, signed", "Peer review checklist, issued within the last 1 month, signed", "Firewall change request form, signed", "Rollback plan, signed", "Business justification memo, issued within the last 3 months, signed", "Post-change test plan, signed"], "submission": {"case": {"name": "firewall change SF-45426", "reference": "IO-20304"}, "documents received": ["SF-45426_peer_review_checklist.pdf. A peer review checklist for firewall change SF-45426, dated 8 May 2026. It is a single page and is signed by the reviewing network engineer.", "SF-45426_proposed_rule_change_specification.pdf. A proposed rule change specification for firewall change SF-45426, dated 3 March 2026. 2 pages, complete. It is signed by the lead network engineer.", "SF-45426_firewall_change_request_form_v3.pdf. A firewall change request form for firewall change SF-45426, dated 24 February 2026. Only pages 1-2 of 3 are included. It is signed by the requesting system administrator.", "SF-45426_business_justification_memo.pdf. A business justification memo for firewall change SF-45426, dated 24 April 2026. It is a single page and is signed by the application owner.", "SF-45426_rollback_plan.pdf. A rollback plan for firewall change SF-45426, dated 21 April 2026. 2 pages, complete. It is signed by the operations shift lead.", "SF-45426_post_change_test_plan.pdf. A firewall change request form... wait, correct: A post-change test plan for firewall change SF-45426, dated 1 February 2026. 2 pages, complete. It is signed by the test coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 864}} {"id": "isc-te-00270-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Brenbrook plc", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "12 March 2026"}, "checklist": ["Risk assessment, issued within the last 3 months and signed", "If the change is planned during the year-end close period, also: freeze period exception approval, signed", "Proposed rule change specification, signed", "Current rule set export, issued within the last 1 months", "Post-change test plan, signed"], "submission": {"case": {"name": "firewall change KF-54774", "reference": "PF-69842", "details": ["The change is planned during the year-end close period."]}, "documents received": ["Proposed rule change specification, firewall change KF-54774. Date of issue: 3 December 2025. 2 pages, complete. Signed by the firewall engineer.", "Post-change test plan, firewall change KF-54774. Date of issue: 6 March 2026. 2 pages, complete. Signed by the test analyst.", "Freeze period exception approval, firewall change KF-54774. Date of issue: 15 November 2025. Single page. Signed by the IT operations manager.", "Current rule set export, firewall change KF-54774. Date of issue: 26 February 2026. 8 pages, complete.", "Rollback plan, firewall change KF-54774. Date of issue: 27 January 2026. 2 pages, complete. Signed by the firewall engineer.", "Risk assessment, firewall change KF-54774. Date of issue: 15 January 2026. 2 pages, complete. Signed by the network security team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 780}} {"id": "isc-te-00109-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Veymere SAS", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "14 April 2026"}, "checklist": ["If the seller intends to list food or cosmetic products, also provide: safety compliance certificate (issued within the last 12 months)", "proof of trading address (issued within the last 3 months)", "product catalogue declaration (signed)", "authorised representative ID copy (valid (not expired) on the date of the review)", "business registration certificate", "returns policy statement (signed)"], "submission": {"case": {"name": "Ulmmore Ltd", "reference": "UN-41460", "details": ["The seller intends to list food or cosmetic products."]}, "documents received": ["Returns policy statement - Ulmmore Ltd.pdf. A returns policy statement for Ulmmore Ltd, dated 27 February 2026. 2 pages, complete. Signed by the operations manager.", "Business registration certificate - Ulmmore Ltd.pdf. A business registration certificate for Ulmmore Ltd, dated 1 March 2026. Single page.", "Product catalogue declaration - Ulmmore Ltd.pdf. A product catalogue declaration for Ulmmore Ltd, dated 19 March 2026. 4 pages, complete. Signed by the managing director.", "Proof of trading address - Ulmmore Ltd.pdf. A proof of trading address for Ulmmore Ltd, dated 16 February 2026. Single page.", "Authorised representative ID copy - Ulmmore Ltd.pdf. An authorised representative ID copy for Ulmmore Ltd showing an expiry date of 12 July 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 744}} {"id": "isc-te-00020-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Belmburg GmbH", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "3 March 2026"}, "checklist": ["Lifting equipment inspection report, issued within the last 6 months and signed", "Parking bay suspension approval, issued within the last 1 months and signed", "New floor snagging list, issued within the last 1 months and signed", "Signed move plan", "IT decommissioning certificate, issued within the last 1 months and signed"], "submission": {"case": {"name": "office move project AZ-40366", "reference": "NC-30638"}, "documents received": ["New floor snagging list for office move project AZ-40366. Date of issue: 21 February 2026. 3 pages, complete. Signed by the site manager.", "Signed move plan for office move project AZ-40366. Date of issue: 25 February 2026. 6 pages, complete. Signed by the project manager.", "Furniture inventory list for office move project AZ-40366. Date of issue: 25 February 2026. 4 pages, complete. Signed by the facilities coordinator.", "Lifting equipment inspection report for office move project AZ-40366. Date of issue: 27 November 2025. 2 pages, complete. Signed by the lifting equipment inspector.", "Parking bay suspension approval for office move project AZ-40366. Date of issue: 25 February 2026. 1 page. Signed by the traffic management officer.", "IT decommissioning certificate for office move project AZ-40366. Date of issue: 14 February 2026. 1 page. Signed by the IT manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 785}} {"id": "isc-te-00051-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Pelllund plc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "15 September 2026"}, "checklist": ["Check that the kit contents list is in the pack.", "Check that the store installation guide is in the pack.", "If the kit includes an electrical display unit, also check that an electrical safety test certificate issued within the last 12 months is in the pack.", "Check that a signed point of sale design proof is in the pack.", "Check that a kit cost breakdown issued within the last 3 months and signed is in the pack."], "submission": {"case": {"name": "merchandising kit JJ-94285", "reference": "ZH-89674", "details": ["The kit includes no electrical display unit."]}, "documents received": ["Point_of_sale_design_proof_JJ-94285.pdf. This is the point of sale design proof for merchandising kit JJ-94285, dated 17 August 2026. 4 pages, complete. It is signed by the design studio manager.", "Store_installation_guide_JJ-94285.pdf. This is the store installation guide for merchandising kit JJ-94285, dated 9 September 2026. 6 pages, complete.", "Kit_cost_breakdown_JJ-94285.pdf. This is the kit cost breakdown for merchandising kit JJ-94285, dated 11 July 2026. 2 pages, complete. It is signed by the retail marketing manager.", "Kit_contents_list_JJ-94285.pdf. This is the kit contents list for merchandising kit JJ-94285, dated 12 June 2026. 2 pages, complete.", "Napkin_sketch_JJ-94285.pdf. This is a rough sketch on a napkin about merchandising kit JJ-94285, dated 17 August 2026. 4 pages, complete. It is signed by the designer.", "Waste_disposal_plan_JJ-94285.pdf. This is the waste disposal plan for merchandising kit JJ-94285, dated 24 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 897}} {"id": "isc-te-00042-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Cindburg Group", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "16 March 2026"}, "checklist": ["Outbound loading record, issued within the last 1 months, signed", "Seal number log, issued within the last 1 months, signed", "Load consolidation sheet, issued within the last 3 months, signed", "Transfer manifest, signed", "Inbound unloading record, issued within the last 1 months, signed", "Damaged goods exception sheet, issued within the last 1 months, signed"], "submission": {"case": {"name": "cross-dock transfer BE-71642", "reference": "UP-20974"}, "cover note": "Hello, please find attached the pack for your review. A colleague has already checked this pack before sending it on to you. Eilidh Rookford", "documents received": ["Seal number log for cross-dock transfer BE-71642, dated 8 March 2026. Single page. Signed by the outbound loading supervisor.", "Transfer manifest for cross-dock transfer BE-71642, dated 20 November 2025. 3 pages, complete. Signed by the transport planner.", "Cross-dock slot booking sheet for cross-dock transfer BE-71642, dated 5 March 2026. Single page. Signed by the dock scheduler.", "Inbound unloading record for cross-dock transfer BE-71642, dated 5 March 2026. Single page. Signed by the inbound unloading supervisor.", "Load consolidation sheet for cross-dock transfer BE-71642, dated 22 August 2025. 2 pages, complete. Signed by the load consolidation supervisor.", "Outbound loading record for cross-dock transfer BE-71642, dated 27 February 2026. Single page. Signed by the outbound loading supervisor.", "Damaged goods exception sheet for cross-dock transfer BE-71642, dated 14 March 2026. Single page. Signed by the inbound unloading supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 856}} {"id": "isc-te-00468-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Pellstow LLP", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "17 July 2026"}, "checklist": ["Prerequisite certificate", "Delegate photo identification, valid (not expired) on the date of the review", "Special requirements note", "Employer sponsorship letter, issued within the last 3 months, signed"], "submission": {"case": {"name": "course booking KO-47091", "reference": "MS-23733"}, "documents received": ["File MS-23733-06.pdf. The file will not open, so its contents cannot be seen.", "Payment confirmation for course booking KO-47091. Date of issue: 25 June 2026. Single page.", "Delegate photo identification for course booking KO-47091. Expiry date: 12 May 2028. Single page.", "Employer sponsorship letter for course booking KO-47091. Date of issue: 4 June 2026. Single page. It is signed by the employer's authorised signatory.", "Prerequisite certificate for course booking KO-47091. Date of issue: 22 June 2026. Single page.", "Special requirements note for course booking KO-47091. Date of issue: 3 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 698}} {"id": "isc-te-00052-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Yarvham GmbH", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "7 May 2026"}, "checklist": ["Naming convention approval, signed", "Account purpose statement", "Platform terms acceptance record, signed", "Two-factor authentication confirmation issued within the last 3 months", "If the account will be run by an external agency, also: agency access agreement, signed", "If the account will post content about financial products, also: financial promotions approval note, signed and issued within the last 3 months", "Account request form, signed", "Content escalation route, signed"], "submission": {"case": {"name": "new social media account AR-54483", "reference": "HK-37859", "details": ["The account will be run entirely by in-house staff.", "The account will post content about financial products."]}, "cover note": "Please could you approve this pack as soon as possible, as all the paperwork is in order. Thanks, Pieter Mundby", "documents received": ["Platform terms acceptance record AR-54483.pdf. This is a single-page platform terms acceptance record for new social media account AR-54483, dated 26 February 2026, and it is signed by the social media governance lead.", "Naming convention approval AR-54483.pdf. This is a single-page naming convention approval for new social media account AR-54483, dated 27 April 2026, and it is signed by the social media governance lead.", "Financial promotions approval note AR-54483.pdf. This is a financial promotions approval note for new social media account AR-54483, dated 24 April 2026. It is 2 pages, complete, and it is signed by the financial promotions approver.", "Two-factor authentication confirmation AR-54483 29 January 2026.pdf. This is a single-page two-factor authentication confirmation for new social media account AR-54483, dated 29 January 2026.", "Content escalation route AR-54483.pdf. This is a single-page content escalation route for new social media account AR-54483, dated 13 April 2026, and it is signed by the social media governance lead.", "Account request form AR-54483.pdf. This is a single-page account request form for new social media account AR-54483, dated 21 February 2026, and it is signed by the requesting marketing manager.", "Account purpose statement AR-54483.pdf. This is a single-page account purpose statement for new social media account AR-54483, dated 28 January 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 998}} {"id": "isc-te-00157-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Morvholm SAS", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "6 March 2026"}, "checklist": ["Financial assessment form, signed.", "If the adult owns property that could be considered in the financial assessment, also: property valuation report, issued within the last 12 months and signed.", "Benefit entitlement letters, issued within the last 12 months.", "Capacity assessment record, signed.", "Proof of identity, valid (not expired) on the date of the review.", "Support plan, signed."], "submission": {"case": {"name": "Dimitris Yellani", "reference": "RL-43050", "details": ["The adult owns property that could be considered in the financial assessment."]}, "cover note": "I am sorry that this pack was put together in a rush. Thank you for your patience while you work through it.", "documents received": ["Benefit entitlement letters - Dimitris Yellani.pdf. Benefit entitlement letters for Dimitris Yellani, dated 2 August 2025. 2 pages, complete.", "Proof of identity - Dimitris Yellani.pdf. Single-page proof of identity for Dimitris Yellani, showing an expiry date of 14 March 2026.", "Proof of identity - Dimitris Yellani.pdf. Single-page proof of identity for Dimitris Yell names are not allowed, showing an expiry date of 6 August 2025.", "Support plan - Dimitris Yellani.pdf. Support plan for Dimitris Yellani, dated 27 January 2026. 6 pages, complete. Signed by the support planner.", "Financial assessment form - Dimitris Yellani.pdf. Financial assessment form for Dimitris Yellani, dated 31 January 2026. 6 pages, complete. Signed by the adult.", "Capacity assessment record - Dimitris Yellani.pdf. Capacity assessment record for Dimitris Yellani, dated 23 November 2025. 4 pages, complete. Signed by the assessor.", "Property valuation report - Dimitris Yellani.pdf. Property valuation report for Dimitris Yellani, dated 7 August 2025. 2 pages, complete. Signed by the valuer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 882}} {"id": "isc-te-00238-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Austmouth Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "11 August 2026"}, "checklist": ["If the borrower is self-employed, also: two most recent tax year overviews (issued within the last 18 months, signed)", "passport (valid (not expired) on the date of the review)", "gifted deposit letter (issued within the last 3 months, signed)", "mortgage application form (issued within the last 3 months, signed)", "three most recent payslips (issued within the last 3 months)"], "submission": {"case": {"name": "Charlotte Lovez", "reference": "OA-94851", "details": ["The borrower is not self-employed."]}, "cover note": "Everything needed for this application is attached and complete. Please review the pack.", "documents received": ["Three most recent payslips for Charlotte Lovez, dated 7 August 2026. 3 pages, complete.", "Proof of deposit savings for Charlotte Lovez, dated 4 July 2026. 2 pages, complete.", "Gifted deposit letter for Charlotte Lovez, dated 3 June 2026. Single page; the signature line is empty.", "Mortgage application form for Charlotte Lovez, dated 4 July 2026. 10 pages, complete, signed by the borrower.", "Passport for Charlotte Lovez, showing an expiry date of 15 December 2028. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 713}} {"id": "isc-te-00337-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Marlgate & Co", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "19 August 2026"}, "checklist": ["Confirm the pack contains a passport style photograph issued within the last 6 months.", "Confirm the pack contains a photo driving licence that is valid, not expired, on the date of the review, 19 August 2026.", "If the applicant is applying for a hackney carriage licence rather than private hire, also confirm the pack contains a vehicle specification sheet for the hackney carriage.", "Confirm the pack contains a medical examination certificate issued within the last 6 months and signed.", "Confirm the pack contains a signed driver declaration of convictions.", "If the applicant has lived at an address outside the country in the last five years, also confirm the pack contains a criminal record certificate from overseas issued within the last 3 months."], "submission": {"case": {"name": "Lotte Wadova", "reference": "JI-80519", "details": ["The applicant is applying for a hackney carriage licence rather than private hire.", "The applicant has lived at an address outside the country in the last five years."]}, "documents received": ["Vehicle_specification_sheet_Wadova_JI80519.pdf: A vehicle specification sheet for the hackney carriage relating to Lotte Wadova. It shows a date of issue of 4 June 2026. 2 pages, complete.", "Medical_certificate_Wadova_JI80519.pdf: A medical examination certificate for Lotte Wadova. It shows a date of issue of 28 July 2026. 2 pages, complete. It is signed by the examining doctor.", "Photograph_Wadova_JI80519.pdf: A passport style photograph of Lotte Wadova. It shows a date of issue of 30 June 2026. It is a single page.", "Overseas_criminal_record_certificate_Wadova_JI80519.pdf: A criminal record certificate from overseas for Lotte Wadova. It shows a date of issue of 1 July 2026. 4 pages, complete.", "Driving_licence_expiry_10August2026_Wadova_JI80519.pdf: A photo driving licence for Lotte Wadova. It shows an expiry date of 10 August 2026. 2 pages, complete.", "Convictions_declaration_Wadova_JI80519.pdf: A driver declaration of convictions for Lotte Wadova. It shows a date of issue of 6 May 2026. It is a single page. It is signed by the driver."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "expired", "defect": "expired before the review", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 969}} {"id": "isc-te-00420-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ebrfield plc", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "10 September 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed", "Anti-bribery policy statement, signed", "Supplier declaration of no conflicts of interest, signed", "Certificate of incorporation", "Supplier registration form, signed"], "submission": {"case": {"name": "Maldcrest Partners", "reference": "LF-56948", "details": ["The supplier is a foreign company."]}, "documents received": ["Bank details confirmation letter - Maldcrest Partners.pdf\nA single-page bank details confirmation letter for Maldcrest Partners, dated 14 August 2026. It is signed by a bank officer.", "Supplier declaration of no conflicts of interest - Maldcrest Partners.pdf\nA single-page supplier declaration of no conflicts of interest for Maldcrest Partners, dated 4 July 2026. It is signed by a director of Maldcrest Partners.", "Certificate of insurance - Maldcrest Partners.pdf\nA certificate of insurance for Maldcrest Partners, showing an expiry date of 17 June 2027. It is 2 pages, complete.", "Certificate of incorporation - Maldcrest Partners.pdf\nA certificate of incorporation for Maldcrest Partners, dated 19 May 2026. It is 2 pages, complete.", "Certified translation of the certificate of incorporation - Maldcrest Partners.pdf\nA certified translation of the certificate of incorporation for Maldcrest Partners, dated 12 August 2026. It is 2 pages, complete, and signed by a certified translator.", "General terms and conditions - Maldcrest Partners.pdf\nA signed copy of the general terms and conditions for Maldcrest Partners, dated 7 July 2026. It is 6 pages, complete, and signed by a director of Maldcrest Partners.", "Supplier registration form - Maldcrest Partners.pdf\nA supplier registration form for Maldcrest Partners, dated 3 June 2026. It is 3 pages, complete, and signed by a director of Maldcrest Partners."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 859}} {"id": "isc-te-00187-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Baxwyn Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "27 July 2026"}, "checklist": ["If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer (issued within the last 3 months)", "depreciation schedule for the asset to date", "sales invoice or receipt for the sale proceeds (issued within the last 3 months)", "profit or loss on disposal calculation (signed)", "board or budget holder approval for the disposal (signed)"], "submission": {"case": {"name": "disposed asset NB-8361", "reference": "QR-52405", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Sales invoice or receipt for the sale proceeds, dated 13 May 2026, for disposed asset NB-8361. 1 page.", "Board or budget holder approval for the disposal, dated 5 April 2026, for disposed asset NB-8361. 1 page. It is signed by the budget holder.", "Profit or loss on disposal calculation, dated 20 July 2026, for disposed asset NB-8361. 1 page. It is signed by the group financial controller.", "Part-exchange valuation from the dealer, dated 29 May 2026, for disposed asset NB-8361. 1 page.", "Depreciation schedule for the asset to date, dated 5 June 2026, for disposed asset NB-8361. 2 pages, complete.", "Asset de-registration and tag removal record, dated 20 May 2026, for disposed asset NB-8361. 1 page. It is signed by the asset register administrator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 785}} {"id": "isc-te-00314-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Marlgard GmbH", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "1 June 2026"}, "checklist": ["If the transfer is an international movement, also: transit customs document (signed)", "load consolidation sheet (issued within the last 3 months, signed)", "seal number log (issued within the last 1 months, signed)", "damaged goods exception sheet (issued within the last 1 months, signed)", "transfer manifest (signed)"], "submission": {"case": {"name": "cross-dock transfer CD-54159", "reference": "GL-47907", "details": ["The transfer is an international movement."]}, "documents received": ["damaged_goods_exception_sheet_CD-54159.pdf. Damaged goods exception sheet for cross-dock transfer CD-54159, dated 28 May 2026. 1 page. Signed by the warehouse shift supervisor.", "load_consolidation_sheet_CD-54159.pdf. Load consolidation sheet for cross-dock transfer CD-54159, dated 25 April 2026. 2 pages, complete. Signed by the load consolidation planner.", "seal_number_log_CD-54159.pdf. Seal number log for cross-dock transfer CD-54159, dated 17 May 2026. 1 page. Signed by the depot security officer.", "transfer_manifest_CD-54159.pdf. Transfer manifest for cross-dock transfer CD-54159, dated 13 March 2026. 3 pages, complete. Signed by the transport planner.", "inbound_unloading_record_CD-54159.pdf. Inbound unloading record for cross-dock transfer CD-54159, dated 19 May 2026. 1 page. Signed by the inbound unloading team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00304-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Stervgard Ltd", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "20 March 2026"}, "checklist": ["Check that the engineer's fault diagnosis report is included, that it was issued within the last 3 months, and that it is signed.", "If the breakdown spoiled perishable stock, also check that the spoiled stock disposal certificate is included, that it was issued within the last 3 months, and that it is signed.", "Check that the policy machinery schedule is included.", "Check that the production downtime log is included, that it was issued within the last 3 months, and that it is signed.", "Check that photographs of the failed component are included.", "Check that the purchase invoice for the machine is included."], "submission": {"case": {"name": "failed machine VU-78923", "reference": "UW-19124"}, "documents received": ["purchase_invoice_machine_VU-78923.pdf. This purchase invoice for the machine relates to failed machine VU-78923 and is dated 26 January 2026. It is a single page.", "engineer_fault_diagnosis_report_VU-78923.pdf. This engineer's fault diagnosis report covers failed machine VU-78923 and is dated 14 January 2026. It has 4 pages, complete, and is signed by the attending engineer.", "machine_maintenance_log_VU-78923.pdf. This machine maintenance log covers failed machine VU-78923 and is dated 12 December 2025. It has 5 pages, complete.", "production_downtime_log_VU-78923.pdf. This production downtime log covers failed machine VU-78923 and is dated 18 February 2026. It has 2 pages, complete, and is signed by the production supervisor.", "spoiled_stock_disposal_certificate_VU-78923.pdf. This spoiled stock disposal certificate covers failed machine VU-78923 and is dated 5 February 2026. It has 2 pages, complete, and is signed by the disposal contractor.", "photographs_failed_component_VU-78923.pdf. This set of photographs of the failed component relates to failed machine VU-78923 and is dated 14 March 2026. It has 2 pages, complete.", "policy_machinery_schedule_VU-78923.pdf. This policy machinery schedule covers failed machine VU-78923 and is dated 26 November 2025. It has 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 975}} {"id": "isc-te-00086-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zervcourt plc", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "3 June 2026"}, "checklist": ["Check the passport: it must be valid, meaning not expired, on 3 June 2026, and it must be signed.", "Check the vehicle condition report: it must be signed.", "Check the booking voucher: it must have been issued within the last 6 months.", "Check the credit card in the driver's name: it must be valid, meaning not expired, on 3 June 2026, and it must be signed."], "submission": {"case": {"name": "Sanne Plumard", "reference": "MC-25332"}, "documents received": ["Fuel policy sheet - Sanne Plumard.pdf - Fuel policy sheet for Sanne Plumard. It shows a date of issue of 18 April 2026. It is a single page, signed by the rental branch counter staff member.", "Booking voucher - Chinedu Brodsen.pdf - Booking voucher issued in the name of Chinedu Brodsen. It shows a date of issue of 31 March 2026. It is a single page.", "Vehicle condition report - Sanne Plumard.pdf - Vehicle condition report for Sanne Plumard. It shows a date of issue of 21 February 2026. It is 2 pages, complete, and it is signed by the inspecting branch staff member.", "Credit card - Sanne Plumard.jpg - Credit card in the driver's name for Sanne Plumard. It shows an expiry date of 22 October 2027. It is a single page, signed by the cardholder.", "Passport - Sanne Plumard.jpg - Passport belonging to Sanne Plumard. It shows an expiry date of 24 November 2026. It is a single page, signed by the passport holder."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 805}} {"id": "isc-te-00289-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Neskheim Ltd", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "2 June 2026"}, "checklist": ["Check that the course booking form is signed.", "Check that a prerequisite certificate is included.", "Check that the employer sponsorship letter was issued within the last 3 months and is signed.", "If the delegate requires an adjusted learning plan, also check that a learning support agreement is included and is signed.", "Check that a special requirements note is included.", "Check that the payment confirmation was issued within the last 3 months."], "submission": {"case": {"name": "course booking GA-88404", "reference": "DT-54396", "details": ["The delegate requires an adjusted learning plan."]}, "documents received": ["Prerequisite certificate GA-88404.pdf. The certificate is dated 21 February 2026 and relates to course booking GA-88404. Single page.", "Employer sponsorship letter GA-88404.pdf. The letter is dated 11 May 2026 and concerns course booking GA-88404. Single page, signed by the employer's HR manager.", "Venue access instructions GA-88404.pdf. The instructions are dated 25 May 2026 and relate to course booking GA-88404. Single page.", "Learning support agreement GA-88404.pdf. The agreement is dated 25 April 2026 and relates to course booking GA-88404. Single page, signed by the course tutor.", "Payment confirmation GA-88404.pdf. The confirmation is dated 29 March 2026 and refers to course booking GA-88404. Single page.", "Special requirements note GA-88404.pdf. The note is dated 13 February 2026 and concerns course booking GA-88404. Single page.", "Course booking form GA-88404.pdf. The form is dated 27 April 2026 and covers course booking GA-88404. 2 pages, complete, and signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Ask yourself: does the pack match the checklist? Review each line of the checklist that is relevant to this case. A required document only counts if it is the kind of document the list names (not a similar one), is about the case subject, has all its pages, is signed in every place the checklist asks for a signature, was not expired on the review date, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for this case. complete: all applicable lines are met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one line cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-61", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 872}} {"id": "isc-te-00388-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Wilmford Inc", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "3 September 2026"}, "checklist": ["Meeting invitation with rights explained — issued within the last 1 month", "Written grievance statement — signed", "Evidence bundle index — signed", "Adjustment request record — issued within the last 3 months and signed"], "submission": {"case": {"name": "Sophie Orvaker", "reference": "RG-91668"}, "documents received": ["RG-91668_written_grievance_statement obscured_signature.pdf — Written grievance statement concerning Sophie Orvaker, dated 29 August 2026. 3 pages, complete. The signature block on the last page is covered by a sticky note, so it cannot be seen whether the document is signed.", "RG-91668_evidence_bundle_index.pdf — Evidence bundle index concerning Sophie Orvaker, dated 25 June 2026. 2 pages, complete. Signed by the employee relations team lead.", "RG-91668_adjustment_request_record.pdf — Adjustment request record concerning Sophie Orvaker, dated 26 July 2026. 1 page. Signed by the line manager.", "RG-91668_meeting_invitation_rights_explained.pdf — Meeting invitation with rights explained concerning Sophie Orvaker, dated 23 August 2026. 1 page.", "RG-91668_grievance_procedure_acknowledgement.pdf — Grievance procedure acknowledgement concerning Sophie Orvaker, dated 30 June 2026. 1 page. Signed by the HR case handler."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 753}} {"id": "isc-te-00362-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Dornham Ltd", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "27 July 2026"}, "checklist": ["Leaver notification form, signed.", "Equipment return receipt, issued within the last 1 months, signed.", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed.", "Final payroll cut-off note, issued within the last 1 months, signed.", "Service desk ticket closure summary, issued within the last 1 months.", "Shared mailbox handover record, issued within the last 1 months, signed.", "Non-disclosure reminder acknowledgement, signed."], "submission": {"case": {"name": "Niamh Gillock", "reference": "GB-48986", "details": ["The leaver held no privileged administrator accounts."]}, "documents received": ["A leaver notification form for Niamh Gillock, dated 3 May 2026. 2 pages, complete. Signed by the line manager.", "A final payroll cut-off note for Niamh Gillock, dated 16 July 2026. Single page. Signed by the payroll officer.", "A shared mailbox handover record for Niamh Gillock, dated 23 July 2026. 2 pages, complete. Signed by the incoming mailbox owner.", "An equipment return receipt for Niamh Gillock. The date of issue is covered by a stamp. Single page. Signed by the receiving IT asset officer.", "An access rights inventory for Niamh Gillock, dated 10 July 2026. 4 pages, complete.", "A non-disclosure reminder acknowledgement for Niamh Gillock, dated 19 April 2026. Single page. Signed by Niamh Gillock.", "A service desk ticket closure summary for Niamh Gillock, dated 10 July 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 815}} {"id": "isc-te-00034-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Kenvstow GmbH", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "2 March 2026"}, "checklist": ["Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "If the flood water reached the upper floor of the property, also: upper floor damage schedule, signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Council flood warning notice, issued within the last 12 months", "Loss adjuster's inspection report, issued within the last 6 months, signed", "Buildings insurance policy schedule", "Debris removal invoice, issued within the last 6 months"], "submission": {"case": {"name": "property EP-34443", "reference": "ES-19965", "details": ["The flood water stayed at ground floor level."]}, "documents received": ["Loss adjuster's inspection report about property EP-34443. Dated 14 February 2026. 6 pages, complete. Signed by the loss adjuster.", "Utility supplier's letter confirming the supply was cut off about property EP-34443. Dated 25 March 2025. 1 page.", "Buildings insurance policy schedule about property EP-34443. Dated 30 November 2025. 5 pages, complete.", "Council flood warning notice about property EP-34443. Dated 2 November 2025. 1 page.", "Flood claim form about property EP-34443. Dated 2 December 2025. 5 pages, complete. Signed by the policyholder.", "Photographs of flood water in the rooms about property EP-34443. Dated 23 February 2026. 3 pages, complete.", "Debris removal invoice about property EP-34443. Dated 27 December 2025. 1 page."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 643}} {"id": "isc-te-00197-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Yarvwood Group", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "2 September 2026"}, "checklist": ["Authorised representative ID copy, valid (not expired) on the date of the review.", "Anti-money laundering questionnaire, signed.", "Tax registration letter.", "Business registration certificate.", "Product catalogue declaration, signed.", "Returns policy statement, signed."], "submission": {"case": {"name": "Quorgate GmbH", "reference": "HF-92686"}, "documents received": ["Product catalogue declaration for Quorgate GmbH. It shows a date of issue of 20 August 2026. 4 pages, complete. It is signed by the authorised representative.", "Authorised representative ID copy for Quorgate GmbH. It shows an expiry date of 16 September 2026. 1 page.", "Returns policy statement for Quorgate GmbH. It shows a date of issue of 27 August 2026. 2 pages, complete. It is signed by the authorised representative.", "Proof of trading address for Quorgate GmbH. It shows a date of issue of 2 August 2026. 1 page.", "Tax registration letter for Quorgate GmbH. It shows a date of issue of 2 August 2026. 1 page.", "Anti-money laundering questionnaire for Quorgate GmbH. It shows a date of issue of 6 June 2026. 3 pages, complete. It is signed by the authorised representative.", "Business registration certificate for Quorgate GmbH. It shows a date of issue of 2 July 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Decide if the pack meets the checklist. Review each checklist line that applies to this case one by one. A required document only counts when it is the kind of document listed (not a similar one), is about the subject of the case, includes all its pages, is signed where the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-34", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 749}} {"id": "isc-te-00371-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ambbrook Limited", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "4 June 2026"}, "checklist": ["Signature verification record, signed", "Lost card declaration, signed", "Fraud questionnaire, signed", "Photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Zeynep Fitzisey", "reference": "OJ-28573"}, "cover note": "Please accept my apologies that this pack was put together in a rush.", "documents received": ["Fraud questionnaire for Zeynep Fitzisey. Date of issue: 14 March 2026. 2 pages, complete. Signed by the cardholder.", "Lost card declaration for Zeynep Fitzisey. Date of issue: 25 May 2026. 1 page. Signed by the cardholder.", "Note about a damaged card for Zeynep Fitzisey. Date of issue: 25 May 2026. 1 page. Signed by the cardholder.", "Photo identification for Zeynep Fitzisey. Expiry date: 23 July 2026. 1 page.", "Delivery address confirmation for Zeynep Fitzisey. Date of issue: 11 February 2026. 1 page. Signed by the cardholder.", "Signature verification record for Zeynep Fitzisey. Date of issue: 4 April 2026. 1 page. Signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 717}} {"id": "isc-te-00370-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Cindford BV", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "12 August 2026"}, "checklist": ["Employment certificate, issued within the last 1 months and signed", "Photo identity document, valid (not expired) on the date of the review", "Property valuation report, issued within the last 6 months and signed", "Bank statement, issued within the last 3 months", "Credit bureau report, issued within the last 1 months", "If the property is a new build, also: new build warranty certificate"], "submission": {"case": {"name": "property YV-75629", "reference": "EX-15818", "details": ["The property is a new build."]}, "documents received": ["Bank statement. It concerns property YV-75629 and shows its date of issue as 22 June 2026. It is 3 pages, complete.", "Employment certificate. It concerns property YV-75629 and shows its date of issue as 28 July 2026. It is 1 page and signed by the applicant's employer.", "Mortgage application form. It concerns property YV-75629 and shows its date of issue as 23 June 2026. It is 6 pages, complete, and signed by the applicant.", "Credit bureau report. It concerns property YV-75629 and shows its date of issue as 22 July 2026. It is 4 pages, complete.", "Photo identity document. It concerns property YV-75629 and shows its expiry date as 4 November 2028. It is 1 page.", "File scan_047. The scan is blank and no contents can be seen.", "New build warranty certificate. It concerns property YV-75629 and shows its date of issue as 27 June 2026. It is 3 pages, complete.", "Property valuation report. It concerns property YV-75629 and shows its date of issue as 25 February 2026. It is 10 pages, complete, and signed by the valuer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 875}} {"id": "isc-te-00357-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zaldlock LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "10 August 2026"}, "checklist": ["Confirm the fuel policy sheet is present and signed.", "If the booking includes crossing a land border, also confirm the cross-border travel permission is present and signed.", "Confirm the passport is present, signed, and valid (not expired) on the date of the review.", "Confirm the insurance excess waiver certificate is present and valid (not expired) on the date of the review.", "Confirm the booking voucher is present and was issued within the last 6 months.", "Confirm the vehicle condition report is present and signed.", "Confirm the additional driver authorisation form is present and signed."], "submission": {"case": {"name": "Beatriz Plumworth", "reference": "WE-85422", "details": ["The booking stays within one country."]}, "documents received": ["Fuel policy sheet. A single-page fuel policy sheet in the name of Beatriz Plumworth, dated 18 April 2026, signed by the named driver.", "Additional driver authorisation form. A single-page authorisation form in the name of Beatriz Plumworth dated 24 July 2026, signed by the named driver.", "Passport. A single-page passport in the name of Beatriz Plumworth showing an expiry date of 29 October 2028, signed by the passport holder.", "Driving licence. A licence in the name of Beatriz Plumworth showing an expiry date of 19 August 2028, signed by the licence holder. 2 pages, complete.", "Vehicle condition report. A report in the name of Beatriz Plumworth dated 30 July 2026, signed by the counter staff member who carried out the vehicle check. 2 pages, complete.", "Insurance excess waiver certificate. A certificate in the name of Beatriz Plumworth showing an expiry date of 5 August 2026. 2 pages, complete.", "Booking voucher. A single-page booking voucher in the name of Beatriz Plumworth showing a date of issue of 7 June 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "expired", "defect": "expired before the review", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 847}} {"id": "isc-te-00102-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Elvcrest Ltd", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "7 May 2026"}, "checklist": ["Proof of registered office address, issued within the last 3 months", "Authorised signer identity document, valid (not expired) on the date of the review", "Board resolution to open the account, signed", "Beneficial owner identification form, signed", "Company tax registration certificate", "Certificate of incorporation"], "submission": {"case": {"name": "Pentlund GmbH", "reference": "WW-71385"}, "documents received": ["Board resolution to open the account for Pentlund GmbH. Date of issue: 6 February 2026. Signed by the chair of the board. Single page.", "Certificate of incorporation for Pentlund GmbH. Date of issue: 2 March 2026. Single page.", "Company tax registration certificate for Pentlund GmbH. Date of issue: 29 April 2026. Single page.", "Beneficial owner identification form for Pentlund GmbH. Date of issue: 17 January 2026. 3 pages, complete. Signed by the authorised signer.", "Authorised signer identity document for Pentlund GmbH. Expiry date: 16 May 2025. Single page.", "Proof of registered office address for Pentlund GmbH. Date of issue: 25 March 2026. Single page.", "Authorised signer identity document for Pentlund GmbH. Expiry date: 14 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 720}} {"id": "isc-te-00058-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Orrfeld plc", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "14 August 2026"}, "checklist": ["Employment income summary, issued within the last 13 months", "Childcare payment receipt, issued within the last 13 months", "Bank interest statement, issued within the last 13 months", "Gift aid donation summary", "Tax return draft printout, signed"], "submission": {"case": {"name": "household tax affairs EZ-41809", "reference": "TK-75367"}, "documents received": ["employment_income_summary.pdf. An employment income summary about household tax affairs EZ-41809, dated 19 July 2026. 2 pages, complete.", "rental_income_record.pdf. A rental income record about household tax affairs EZ-41809, dated 17 May 2026. 4 pages, complete.", "bank_interest_statement_v3.pdf. A bank interest statement about household tax affairs EZ-41809, dated 11 July 2026. Pages 1 to 1 are included; the total number of pages is not shown anywhere.", "gift_aid_donation_summary.pdf. A gift aid donation summary about household tax affairs EZ-41809, dated 4 May 2026. It is a single page.", "tax_return_draft_printout.pdf. A tax return draft printout about household tax affairs EZ-41809, dated 20 May 2026. 6 pages, complete. It carries the signature of the household's tax filer.", "childcare_payment_receipt.pdf. A childcare payment receipt about household tax affairs EZ-41809, dated 13 October 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00014-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ambton SAS", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "15 June 2026"}, "checklist": ["Proof of deposit, issued within the last 3 months", "Sale and purchase agreement, signed", "Credit bureau report, issued within the last 1 months", "Property valuation report, issued within the last 6 months and signed", "If the property is being bought from a family member, also: independent purchase price assessment, issued within the last 3 months and signed", "Mortgage application form, signed", "Bank statement, issued within the last 3 months"], "submission": {"case": {"name": "property NI-98706", "reference": "PN-38882", "details": ["The property is being bought from an unrelated seller."]}, "cover note": "I am sorry that this pack was put together in a rush. If anything needs clarifying, please let me know and I will send it over.", "documents received": ["Credit bureau report for property NI-98706. Date of issue: 5 June 2026. 4 pages, complete.", "File 0392.pdf: the file will not open, so its contents cannot be seen.", "Bank statement for property NI-98706. Date of issue: 16 May 2026. 3 pages, complete.", "Mortgage application form for property NI-98706. Date of issue: 25 April 2026. 6 pages, complete. Signed by the applicant.", "Employment certificate for property NI-98706. Date of issue: 8 June 2026. 1 page. Signed by the employer.", "Property valuation report for property NI-98706. Date of issue: 12 March 2026. 10 pages, complete. Signed by the valuer.", "Sale and purchase agreement for property NI-98706. Date of issue: 17 May 2026. 9 pages, complete. Signed by the buyer and the seller.", "Proof of deposit for property NI-98706. Date of issue: 7 April 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 879}} {"id": "isc-te-00339-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Pellwood Ltd", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "4 May 2026"}, "checklist": ["Medical examination certificate, issued within the last 6 months and signed.", "Right to work share code printout, issued within the last 3 months.", "Licence application form, signed.", "If the applicant has lived at an address outside the country in the last five years, also: criminal record certificate from overseas, issued within the last 3 months.", "Photo driving licence, valid (not expired) on the date of the review.", "Passport style photograph, issued within the last 6 months."], "submission": {"case": {"name": "Manon Pimingham", "reference": "YV-79327", "details": ["The applicant has lived at an address outside the country in the last five years."]}, "documents received": ["Licence application form for Manon Pimingham. Dated 11 January 2026. 6 pages, complete. Signed by the applicant.", "Knowledge test pass certificate for Manon Pimingham. Dated 19 February 2026. Single page.", "Driver declaration of convictions for Manon Pimingham. Dated 29 January 2026. Single page. Signed by the driver.", "Photo driving licence for Manon Pimingham. Expiry date 1 July 2027. 2 pages, complete.", "Medical examination certificate for Manon Pimingham. Dated 15 December 2025. 2 pages, complete. Signed by the examining doctor.", "Right to work share code printout for Manon Pimingham. Dated 30 April 2026. Single page.", "Passport style photograph for Manon Pimingham. Dated 9 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 789}} {"id": "isc-te-00142-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Maldwick Limited", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "25 March 2026"}, "checklist": ["Two-factor authentication confirmation, issued within the last 3 months.", "Content escalation route, signed.", "Account purpose statement.", "Platform terms acceptance record, signed.", "Naming convention approval, signed."], "submission": {"case": {"name": "new social media account YK-40400", "reference": "WH-23864"}, "documents received": ["YK-40400_content_escalation_route.pdf. A content escalation route for new social media account YK-40400, dated 7 December 2025. This single page is signed by the social media manager.", "YK-40400_admin_access_list.pdf. An admin access list for new social media account YK-40400, dated 21 March 2026. It is a single page.", "YK-40400_account_purpose_statement.pdf. An account purpose statement for new social media account YK-40400, dated 2 January 2026. It is a single page.", "YK-40400_naming_convention_approval.pdf. A naming convention approval for new social media account YK-40400, dated 30 December 2025. This single page is signed by the social media manager.", "YK-40400_two-factor_authentication_confirmation.pdf. A two-factor authentication confirmation for new social media account YK-40400. It is a single page, and the date on it is obscured by an ink stamp.", "YK-40400_platform_terms_acceptance_record.pdf. A platform terms acceptance record for new social media account YK-40400, dated 16 March 2026. This single page is signed by the social media manager.", "YK-40400_account_closure_procedure.pdf. An account closure procedure for new social media account YK-40400, dated 28 November 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 867}} {"id": "isc-te-00371-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ambbrook Limited", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "4 June 2026"}, "checklist": ["Signature verification record, signed", "Lost card declaration, signed", "Fraud questionnaire, signed", "Photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Zeynep Fitzisey", "reference": "OJ-28573"}, "documents received": ["Note about a damaged card for Zeynep Fitzisey. Date of issue: 25 May 2026. 1 page. Signed by the cardholder.", "Photo identification for Zeynep Fitzisey. Expiry date: 23 July 2026. 1 page.", "Lost card declaration for Zeynep Fitzisey. Date of issue: 25 May 2026. 1 page. Signed by the cardholder.", "Signature verification record for Zeynep Fitzisey. Date of issue: 4 April 2026. 1 page. Signed by the cardholder.", "Account statement showing recent activity for Zeynep Fitzisey. Date of issue: 2 June 2026. 3 pages, complete.", "Fraud questionnaire for Zeynep Fitzisey. Date of issue: 14 March 2026. 2 pages, complete. Signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 695}} {"id": "isc-te-00449-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Yselfell Limited", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "3 July 2026"}, "checklist": ["Confirm the boarding pass stub is present.", "Confirm the expense claim form is present and signed.", "Confirm the hotel invoice is present and issued within the last 6 months.", "Confirm the conference fee invoice is present and issued within the last 12 months.", "If the claim exceeds the limit that requires director sign-off, also confirm the director approval slip is present, issued within the last 3 months and signed."], "submission": {"case": {"name": "Aoife Brodisey", "reference": "RQ-48538", "details": ["The claim exceeds the limit that requires director sign-off."]}, "documents received": ["Director approval slip - Aoife Brodisey.pdf - Director approval slip for Aoife Brodisey. Date of issue: 20 May 2026. 1 page. Signed by the director.", "Currency conversion statement - Aoife Brodisey.pdf - Currency conversion statement for Aoife Brodisey. Date of issue: 5 March 2026. 1 page.", "Hotel invoice - Aoife Brodisey.pdf - Hotel invoice for Aoife Brodisey. Date of issue: 7 June 2026. 2 pages, complete.", "Boarding pass stub - Aoife Brodisey.pdf - Boarding pass stub for Aoife Brodisey. Date of issue: 13 June 2026. 1 page.", "Conference fee invoice - Aoife Brodisey.pdf - Conference fee invoice for Aoife Brodisey. Date of issue: 20 August 2025. 1 page.", "Expense claim form - Aoife Brodisey.pdf - Expense claim form for Aoife Brodisey. Date of issue: 19 May 2026. 2 pages, complete. Signed by the claiming employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 814}} {"id": "isc-te-00025-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Dravside Group", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "16 September 2026"}, "checklist": ["Previous grievance outcome letter, issued within the last 24 months.", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed.", "Witness list, signed.", "Evidence bundle index, signed.", "Investigator appointment letter, issued within the last 3 months."], "submission": {"case": {"name": "Carmen Daskow", "reference": "VR-41263", "details": ["The grievance is not against the employee's direct manager."]}, "cover note": "I am not sure everything needed is in this pack, so please check it carefully.", "documents received": ["VR-41263 previous grievance outcome letter - Carmen Daskow.pdf. Previous grievance outcome letter about Carmen Daskow, dated 16 January 2025. 2 pages, complete.", "VR-41263 witness list - Carmen Daskow.pdf. Witness list about Carmen Daskow, dated 3 July 2026. A single page, signed by the case handler.", "VR-41263 grievance procedure acknowledgement - Carmen Daskow.pdf. Grievance procedure acknowledgement about Carmen Daskow, dated 4 August 2026. A single page, signed by the case handler.", "VR-41263 evidence bundle index - Carmen Daskow.pdf. Evidence bundle index about Carmen Daskow, dated 3 September 2026. 2 pages, complete, signed by the case handler.", "VR-41263 investigator appointment letter - Carmen Daskow.pdf. Investigator appointment letter about Carmen Daskow, dated 12 July 2026. A single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 792}} {"id": "isc-te-00161-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Kenvcliff & Co", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "17 June 2026"}, "checklist": ["Financial expenditure summary, issued within the last 3 months and signed.", "Annual activity report, issued within the last 6 months and signed.", "If the institute received industry funding above the university's disclosure threshold, also: industry funding disclosure statement, issued within the last 12 months and signed.", "Staffing plan, issued within the last 6 months and signed.", "External advisory board minutes, issued within the last 12 months and signed.", "Director's declaration of interests, issued within the last 12 months and signed."], "submission": {"case": {"name": "Iskmoor & Co", "reference": "YW-63386", "details": ["The institute received industry funding above the university's disclosure threshold."]}, "cover note": "I am not certain that everything needed has made it into this pack, so please check it over before confirming anything.", "documents received": ["Industry funding disclosure statement for Iskmoor & Co, dated 22 March 2026. A single page. Signed by the institute director.", "Financial expenditure summary for Iskmoor & Co, dated 11 May 2026. 3 pages, complete. Signed by the institute finance officer.", "Annual activity report for Iskmoor & Co, dated 26 February 2026. 12 pages, complete. Signed by the institute director.", "External advisory board minutes for Iskmoor & Co, dated 19 December 2025. 4 pages, complete. Signed by the chair of the external advisory board.", "Publications list for Iskmoor & Co, dated 28 January 2026. 4 pages, complete.", "Staffing plan for Iskmoor & Co, dated 10 March 2026. 2 pages, complete. Signed by the institute director.", "Director's declaration of interests for Iskmoor & Co, dated 14 May 2026. A single page. Signed by the institute director.", "Organisational chart for Iskmoor & Co, dated 10 March 2026, showing the structure from three years ago. 2 pages, complete. Signed by the institute director."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 708}} {"id": "isc-te-00002-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Hondford Limited", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "21 May 2026"}, "checklist": ["Firewall change request form, signed.", "Current rule set export, issued within the last 1 month.", "Post-change test plan, signed.", "Peer review checklist, issued within the last 1 month and signed.", "Proposed rule change specification, signed.", "Business justification memo, issued within the last 3 months and signed."], "submission": {"case": {"name": "firewall change DG-58616", "reference": "DU-21666"}, "documents received": ["Business justification memo for change DG-58616. Date of issue: 12 February 2026. Single page. Signed by the requesting business manager.", "Peer review checklist for change DG-58616. Date of issue: 14 May 2026. Single page. Signed by the reviewing peer engineer.", "Rollback plan for change DG-58616. Date of issue: 30 March 2026. 2 pages, complete. Signed by the operations lead.", "Proposed rule change specification for change DG-58616. Date of issue: 12 February 2026. 2 pages, complete. Signed by the senior firewall engineer.", "Firewall change request form for change DG-58616. Date of issue: 12 April 2026. 3 pages, complete. Signed by the requesting network engineer.", "Current rule set export for change DG-58616. Date of issue: 12 May 2026. 8 pages, complete.", "Post-change test plan for change DG-58616. Date of issue: 27 April 2026. 2 pages, complete. Signed by the test lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00252-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Belmfell LLP", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "12 May 2026"}, "checklist": ["Facility access application form, signed", "Photo identity document, valid (not expired) on the date of the review", "Home institution endorsement letter, issued within the last 6 months and signed", "Radiation safety training certificate, issued within the last 24 months and signed", "Beam time or instrument booking confirmation", "Host scientist invitation letter, issued within the last 6 months and signed"], "submission": {"case": {"name": "Pieter Grubfield", "reference": "IS-40676"}, "documents received": ["Host scientist invitation letter - Grubfield.pdf. A host scientist invitation letter for Pieter Grubfield, issued on 16 January 2026. Single page, signed by the host scientist.", "Facility access application form - Grubfield.pdf. A facility access application form for Pieter Grubfield, dated 13 April 2026. 2 pages, complete. It is signed by the applicant.", "Beam time confirmation - Grubfield.pdf. A beam time or instrument booking confirmation for Pieter Grubfield, dated 4 March 2026. Single page.", "Insurance declaration for facility work - Grubfield.pdf. An insurance declaration for facility work for Pieter Grubfield, dated 5 April 2026. Single page, signed by the applicant.", "Radiation safety training certificate - Grubfield.pdf. A radiation safety training certificate for Pieter Grubfield, issued on 23 October 2024. Single page, signed by the training provider.", "Photo identity document - Grubfield.pdf. A photo identity document for Pieter Grubfield showing an expiry date of 20 September 2027. Single page.", "Home institution endorsement letter - Grubfield, date not visible.pdf. A home institution endorsement letter for Pieter Grubfield; the date of issue is smudged and cannot be read. Single page, signed by the head of department."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The verdict complete: every applicable line is met (extra documents do not matter). The verdict incomplete: at least one applicable line is not met. The verdict unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-21", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 854}} {"id": "isc-te-00208-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Urvmore SAS", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "3 September 2026"}, "checklist": ["Previous flexible working requests record, issued within the last 24 months", "Trial period proposal, signed", "Flexible working request form, signed", "Line manager opinion note, issued within the last 2 months and signed", "If the request is to work entirely from home, also: home working equipment checklist, signed"], "submission": {"case": {"name": "Hannah Wadingham", "reference": "IR-86010", "details": ["The request is to work entirely from home."]}, "documents received": ["Line_manager_opinion_note_2026-08-28.pdf. Line manager opinion note for Hannah Wadingham, dated 28 August 2026. 2 pages, complete. Signed by the line manager.", "Flexible_working_request_form_2026-06-11_pages_1-1.pdf. Flexible working request form for Hannah Wadingham, dated 11 June 2026. Pages 1 to 1 are included; the total number of pages is not shown anywhere in the document. Signed by the employee.", "Home_working_equipment_checklist_2026-05-27.pdf. Home working equipment checklist for Hannah Wadingham, dated 27 May 2026. 2 pages, complete. Signed by the employee.", "Previous_flexible_working_requests_record_2024-10-05.pdf. Previous flexible working requests record for Hannah Wadingham, dated 5 October 2024. 1 page.", "Trial_period_proposal_2026-07-29.pdf. Trial period proposal for Hannah Wadingham, dated 29 July 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete when measured against the checklist. Go over every checklist line relevant to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, contain all its pages, carry a signature wherever the checklist asks for one, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': all applicable lines are met (extra documents do not matter). 'incomplete': at least one applicable line is unmet. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-45", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00117-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Istcombe plc", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "27 May 2026"}, "checklist": ["Include a previous grievance outcome letter issued within the last 24 months.", "Include a grievance procedure acknowledgement issued within the last 3 months and signed.", "If the grievance alleges bullying by a named colleague, also include a bullying allegation evidence log, signed.", "Include an evidence bundle index, signed.", "Include a written grievance statement, signed.", "Include a meeting invitation with rights explained issued within the last 1 months.", "Include an adjustment request record issued within the last 3 months and signed."], "submission": {"case": {"name": "Piotr Aldthwaite", "reference": "RG-62178", "details": ["The grievance alleges bullying by a named colleague."]}, "documents received": ["PA-RG-62178-06 meeting invitation with rights explained.pdf — A meeting invitation with rights explained concerning Piotr Aldthwaite, dated 9 May 2026. It is a single page.", "PA-RG-62178-03 bullying allegation evidence log.pdf — A bullying allegation evidence log concerning Piotr Aldthwaite, dated 2 May 2026. 3 pages, complete, and signed by the investigating officer.", "PA-RG-62178-05 written grievance statement.pdf — A written grievance statement concerning Piotr Aldthwaite, dated 2 April 2026. 3 pages, complete, and signed by the employee.", "PA-RG-62178-07 adjustment request record.pdf — An adjustment request record concerning Piotr Aldthwaite, dated 19 March 2026. It is a single page and is signed by the line manager.", "PA-RG-62178-02 grievance procedure acknowledgement.pdf — A grievance procedure acknowledgement concerning Piotr Aldthwaite, dated 4 April 2026. It is a single page and is signed by the HR case handler.", "PA-RG-62178-04 evidence bundle index.pdf — An evidence bundle index concerning Piotr Aldthwaite, dated 5 February 2026. 2 pages, complete, and signed by the case coordinator.", "PA-RG-62178-01 previous grievance outcome letter.pdf — A previous grievance outcome letter concerning Piotr Aldthwaite, dated 11 June 2024. 2 pages, complete.", "PA-RG-62178-08 previous grievance outcome letter.pdf — A previous grievance outcome letter concerning Piotr Aldthwaite, dated 31 March 2023. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 991}} {"id": "isc-te-00222-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Pellmoor plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "2 March 2026"}, "checklist": ["Bank reference letter, issued within the last 6 months, signed", "Company registration certificate", "Signed credit terms agreement, signed", "Credit limit approval memo, issued within the last 1 months, signed", "Trade references letter, issued within the last 3 months, signed", "Only if the customer requests a credit limit above the standard cap, also: finance director sanction letter, issued within the last 1 months, signed"], "submission": {"case": {"name": "Ivrwick LLP", "reference": "RR-10016", "details": ["The customer requests a credit limit above the standard cap."]}, "documents received": ["Trade_references_letter_Ivrwick_LLp_date_unclear.pdf. Trade references letter for Ivrwick LLP. The date of issue is covered by a stamp and cannot be read. 1 page, signed by the referee company's credit manager.", "Company_registration_certificate_Ivrwick_LLp_9Nov2025.pdf. Company registration certificate for Ivrwick LLP, dated 9 November 2025. 2 pages, complete.", "Signed_credit_terms_agreement_Ivrwick_LLp_17Nov2025.pdf. Signed credit terms agreement for Ivrwick LLP, dated 17 November 2025. 4 pages, complete, signed by a partner of Ivrwick LLP.", "Bank_reference_letter_Ivrwick_LLp_27Feb2026.pdf. Bank reference letter for Ivrwick LLP, dated 27 February 2026. 1 page, signed by the bank's relationship manager.", "Credit_limit_approval_memo_Ivrwick_LLp_18Feb2026.pdf. Credit limit approval memo for Ivrwick LLP, dated 18 February 2026. 1 page, signed by the credit control manager.", "Finance_director_sanction_letter_Ivrwick_LLp_14Feb2026.pdf. Finance director sanction letter for Ivrwick LLP, dated 14 February 2026. 1 page, signed by the finance director."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 673}} {"id": "isc-te-00207-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Crancombe Inc", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "4 August 2026"}, "checklist": ["Leave balance statement, issued within the last 3 months", "If the leave requested is longer than two weeks, also: extended absence cover plan (signed)", "Handover note (signed)", "Team holiday planner extract", "Contact plan for time away", "Return to work date confirmation", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave (signed)"], "submission": {"case": {"name": "Femke Grubwick", "reference": "MF-51224", "details": ["The leave requested is longer than two weeks.", "The employee is requesting leave during a known busy period."]}, "cover note": "Please find attached the leave pack for review. I am not sure everything needed is included, so please check it over. Let me know if anything else is required.", "documents received": ["extended_absence_cover_plan_MF-51224.pdf. Extended absence cover plan for Femke Grubwick, dated 16 July 2026. 3 pages, complete; signed by the line manager.", "contact_plan_for_time_away_MF-51224.pdf. Contact plan for time away for Femke Grubwick, dated 27 June 2026. 1 page.", "return_to_work_date_confirmation_MF-51224.pdf. Return to work date confirmation for Femke Grubwick, dated 4 May 2026. 1 page.", "team_holiday_planner_extract_MF-51224.pdf. Team holiday planner extract for Femke Grubwick, dated 8 June 2026. 2 pages, complete.", "business_case_for_peak_period_leave_MF-51224.pdf. Business case for peak-period leave for Femke Grubwick, dated 13 May 2026. 2 pages, complete; signed by the line manager.", "handover_note_MF-51224.pdf. Handover note for Femke Grubwick, dated 23 July 2026. 2 pages, complete; signed by the line manager.", "manager_approval_email_MF-51224.pdf. Manager approval email for Femke Grubwick, dated 23 June 2026. 1 page.", "leave_balance_statement_MF-51224.pdf. Leave balance statement for Femke Grubwick, dated 15 May 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 956}} {"id": "isc-te-00001-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Lunburg GmbH", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "25 August 2026"}, "checklist": ["Line manager confirmation, issued within the last 1 months, signed", "Equipment return receipt, issued within the last 1 months, signed", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed", "Shared mailbox handover record, issued within the last 1 months, signed", "Non-disclosure reminder acknowledgement, signed", "Access rights inventory, issued within the last 1 months"], "submission": {"case": {"name": "Sarah Harvham", "reference": "KE-21974", "details": ["The leaver held no privileged administrator accounts."]}, "cover note": "Could you approve this pack as soon as possible, please? All the paperwork is in order.", "documents received": ["Access rights inventory - Sarah Harvham.pdf. An access rights inventory concerning Sarah Harvham, dated 20 August 2026. It is 4 pages, complete.", "Leaver notification form - Sarah Harvham.pdf. A leaver notification form concerning Sarah Harvham, dated 30 May 2026. It is 2 pages, complete, and is signed by the line manager.", "Contract of employment - Sarah Harvham.pdf. A copy of the employee's original contract of employment concerning Sarah Harvham, dated 23 July 2026. It is 1 page and is signed by the HR manager.", "Equipment return receipt - Sarah Harvham.pdf. An equipment return receipt concerning Sarah Harvham, dated 10 August 2026. It is 1 page and is signed by the IT asset coordinator.", "Line manager confirmation - Sarah Harvham.pdf. A line manager confirmation concerning Sarah Harvham, dated 4 August 2026. It is 1 page and is signed by the line manager.", "Shared mailbox handover record - Sarah Harvham.pdf. A shared mailbox handover record concerning Sarah Harvham, dated 8 August 2026. It is 2 pages, complete, and is signed by the receiving mailbox owner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 872}} {"id": "isc-te-00112-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lunhall Ltd", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "2 July 2026"}, "checklist": ["If the move includes taking furniture to a storage unit, also: storage unit access authorisation (signed)", "lifting equipment inspection report (issued within the last 6 months, signed)", "IT decommissioning certificate (issued within the last 1 months, signed)", "new floor snagging list (issued within the last 1 months, signed)", "movers insurance certificate (valid (not expired) on the date of the review)", "signed move plan (signed)", "crate hire agreement (signed)"], "submission": {"case": {"name": "office move project VB-98815", "reference": "KT-58591", "details": ["The move includes taking furniture to a storage unit."]}, "cover note": "Hi team, please find everything needed for the office move project pack attached and complete for your review. Many thanks, Eilidh Sabwick", "documents received": ["KT-58591 New floor snagging list VB-98815.pdf. This is a new floor snagging list for office move project VB-98815, 3 pages, complete. Its date of issue cannot be made out, as it is covered by a stamp. It has been signed by the site manager.", "KT-58591 IT decommissioning certificate VB-98815.pdf. This is a one-page IT decommissioning certificate for office move project VB-98815, dated 16 June 2026. It has been signed by the IT manager.", "KT-58591 Storage unit access authorisation VB-98815.pdf. This is a one-page storage unit access authorisation for office move project VB-98815, dated 4 June 2026. It has been signed by the facilities manager.", "KT-58591 Crate hire agreement VB-98815.pdf. This is a crate hire agreement for office move project VB-98815, dated 9 June 2026. 2 pages, complete. It has been signed by the supplier's representative.", "KT-58591 Lifting equipment inspection report VB-98815.pdf. This is a lifting equipment inspection report for office move project VB-98815, dated 16 February 2026. 2 pages, complete. It has been signed by the lifting equipment inspector.", "KT-58591 Signed move plan VB-98815.pdf. This is a signed move plan for office move project VB-98815, dated 11 June 2026. 6 pages, complete. It has been signed by the project manager.", "KT-58591 Movers insurance certificate VB-98815.pdf. This is a one-page movers insurance certificate for office move project VB-98815. It shows an expiry date of 20 May 2027.", "KT-58591 Parking bay suspension approval VB-98815.pdf. This is a one-page parking bay suspension approval for office move project VB-98815, dated 18 June 2026. It has been signed by the local authority parking officer.", "KT-58591 Furniture inventory list VB-98815.pdf. This is a furniture inventory list for office move project VB-98815, dated 19 June 2026. 4 pages, complete. It has been signed by the facilities coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1192}} {"id": "isc-te-00153-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jorwell Partners", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "22 May 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Travel request form (signed)", "Passport copy for international travel (valid (not expired) on the date of the review)", "Flight itinerary quote (issued within the last 1 months)", "Visa entry requirement printout (issued within the last 3 months)", "Trip cost estimate (signed)", "Travel policy acknowledgement (signed)"], "submission": {"case": {"name": "business trip SC-57627", "reference": "VR-75039", "details": ["The traveller is not a passport holder of the destination country."]}, "cover note": "Please accept my apologies that this pack was put together in a rush.", "documents received": ["Flight itinerary quote for business trip SC-57627. Dated 18 May 2026. 2 pages, complete.", "Passport copy for international travel for business trip SC-57627. Passport expiry date: 22 November 2027. Single page.", "Visa entry requirement printout for business trip SC-57627. Dated 15 May 2026. 2 pages, complete.", "Trip cost estimate for business trip SC-57627. Dated 10 April 2026. Single page. Signed by the line manager.", "Travel policy acknowledgement for business trip SC-57627. Dated 2 February 2026. Single page. Signed by the traveller.", "Work permit confirmation for business trip SC-57627. Dated 30 April 2026. 2 pages, complete.", "Travel request form for business trip SC-57627. Dated 3 April 2026. 2 pages, complete. Signed by the traveller."]}}, "question": {"type": "choice", "instructions": "Your task is to determine whether the pack is complete when measured against the checklist. Go over every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. The answer is complete: every applicable line is met (extra documents do not matter). The answer is incomplete: at least one applicable line is not met. The answer is unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, as they may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-16", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 848}} {"id": "isc-te-00294-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Ulmfield Inc", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "23 April 2026"}, "checklist": ["Check the location details sheet is present.", "Check the cost estimate is present, was issued within the last 3 months, and is signed.", "Check the job request form is present and is signed.", "Check the parts order confirmation is present and was issued within the last 1 months.", "If the job involves working at height above two metres, also check the permit to work at height is present, was issued within the last 1 months, and is signed.", "Check the access authorisation slip is present and is signed."], "submission": {"case": {"name": "maintenance request PZ-34030", "reference": "IX-99751"}, "documents received": ["A single-page location details sheet for maintenance request PZ-34030, dated 17 April 2026.", "A cost estimate for maintenance request PZ-34030, dated 14 April 2026. It has 2 pages, complete. It is signed by the estimating manager.", "A single-page access authorisation slip for maintenance request PZ-34030, dated 12 January 2026. It is signed by the site security manager.", "A single-page parts order confirmation for maintenance request PZ-34030, dated 10 April 2026.", "A single-page job request form for maintenance request PZ-34030, dated 2 January 2026. It is signed by the requesting department manager.", "Photographs of the fault for maintenance request PZ-34030, dated 4 March 2026. It has 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 592}} {"id": "isc-te-00082-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Larvcourt Inc", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "29 July 2026"}, "checklist": ["Localisation completeness report, issued within the last 1 month", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months and signed", "Marketing screenshot pack", "Privacy policy update, issued within the last 3 months", "If the mobile app release adds a new payment feature, also: payment provider compliance checklist, issued within the last 3 months and signed", "Store listing description, issued within the last 1 month", "Age rating questionnaire, signed"], "submission": {"case": {"name": "mobile app release GK-81797", "reference": "ZI-76687", "details": ["The mobile app release includes third-party analytics.", "The mobile app release adds a new payment feature."]}, "documents received": ["store-listing-description-GK-81797.pdf — Store listing description for mobile app release GK-81797. It shows its date of issue as 15 July 2026. It is 1 page.", "localisation-completeness-report-GK-81797.pdf — Localisation completeness report for mobile app release GK-81797. It shows its date of issue as 23 July 2026. 2 pages, complete.", "payment-provider-compliance-checklist-GK-81797.pdf — Payment provider compliance checklist for mobile app release GK-81797. It shows its date of issue as 4 July 2026. 3 pages, complete, signed by the Payments Lead.", "age-rating-questionnaire-GK-81797.pdf — Age rating questionnaire for mobile app release GK-81797. It shows its date of issue as 17 April 2026. 2 pages, complete, signed by the Mobile Release Manager.", "marketing-screenshot-pack-GK-81797.pdf — Marketing screenshot pack for mobile app release GK-81797. It shows its date of issue as 31 May 2026. 6 pages, complete.", "privacy-policy-update-GK-81797.pdf — Privacy policy update for mobile app release GK-81797. It shows its date of issue as 25 April 2026. 2 pages, complete.", "analytics-data-consent-statement-GK-81797.pdf — Analytics data consent statement for mobile app release GK-81797. It shows its date of issue as 29 June 2026. It is 1 page, signed by the Data Protection Officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 992}} {"id": "isc-te-00333-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Iskwald Limited", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "3 April 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed.", "Anti-bribery policy statement, signed.", "Certificate of insurance, valid (not expired) on the date of the review.", "Signed copy of the general terms and conditions, signed."], "submission": {"case": {"name": "Dundfeld Ltd", "reference": "GD-75611"}, "documents received": ["Bank details confirmation letter for Dundfeld Ltd, dated 14 January 2026. Single page. Signed by a bank officer.", "Certificate of insurance for Dundfeld Ltd, expiring 24 January 2028. 2 pages, complete.", "Signed copy of the general terms and conditions for Dundfeld Ltd, dated 10 March 2026. 6 pages, complete. Signed by a company director.", "Anti-bribery policy statement for Dundfeld Ltd, dated 22 January 2026. 2 pages, complete. Signed by a company director.", "File 8481-SCAN.pdf: the file will not open, so its contents cannot be seen.", "Supplier declaration of no conflicts of interest for Dundfeld Ltd, dated 11 January 2026. Single page. Signed by a company director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 692}} {"id": "isc-te-00032-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Caelley GmbH", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "3 July 2026"}, "checklist": ["Photographs of the spillage on the floor, issued within the last 1 months.", "Cleaning log for the day of the incident, issued within the last 6 months, signed.", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months, signed.", "Liability claim form, signed.", "Incident report from the day, issued within the last 3 months, signed."], "submission": {"case": {"name": "Elvshaw Ltd", "reference": "YZ-88387", "details": ["The customer has appointed a solicitor for the claim."]}, "cover note": "Please find attached everything needed for this claim, which is complete. Let me know if you need anything further. Pablo Kipow", "documents received": ["Elvshaw_Ltd_spillage_floor_photographs_22_June_2026.pdf. Photographs of the spillage on the floor relating to Elvshaw Ltd. Date of issue shown as 22 June 2026. Single page.", "Elvshaw_Ltd_witness_statement_24_May_2026.pdf. Witness statement from a staff member relating to Elvshaw Ltd. Date of issue shown as 24 May 2026. Single page. Signed by the staff member who witnessed the incident.", "Elvshaw_Ltd_cleaning_log_24_February_2026.pdf. Cleaning log for the day of the incident relating to Elvshaw Ltd. Date of issue shown as 24 February 2026. Single page. Signed by the duty manager.", "Elvshaw_Ltd_incident_report_undated.pdf. Incident report from the day relating to Elvshaw Ltd. The date of issue is smudged and cannot be made out. 2 pages, complete. Signed by the shift supervisor.", "Elvshaw_Ltd_letter_of_claim_31_March_2026.pdf. Letter of claim from the solicitor relating to Elvshaw Ltd. Date of issue shown as 31 March 2026. 3 pages, complete. Signed by the customer's solicitor.", "Elvshaw_Ltd_liability_claim_form_16_May_2026.pdf. Liability claim form relating to Elvshaw Ltd. Date of issue shown as 16 May 2026. 3 pages, complete. Signed by the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 953}} {"id": "isc-te-00421-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Briskcliff LLP", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "3 June 2026"}, "checklist": ["Travel policy acknowledgement, signed.", "Line manager approval, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Trip cost estimate, signed.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Travel request form, signed."], "submission": {"case": {"name": "business trip WR-16880", "reference": "LV-18491", "details": ["The trip involves no country requiring a visa."]}, "documents received": ["Line manager approval for business trip WR-16880, issued 16 March 2026. Single page. Signed by the line manager.", "Passport copy for international travel for business trip WR-16880. Expiry date 27 August 2027. Single page.", "Hotel booking confirmation for business trip WR-16880, issued 15 March 2026. 2 pages, complete.", "Hotel loyalty programme enrolment form for business trip WR-16880, issued 9 February 2026. 2 pages, complete. Signed by the employee.", "Travel request form for business trip WR-16880, issued 9 February 2026. 2 pages, complete. Signed by the employee.", "Travel policy acknowledgement for business trip WR-16880, issued 2 May 2026. Single page. Signed by the employee.", "Visa entry requirement printout for business trip WR-16880, issued 25 March 2026. 2 pages, complete.", "Trip cost estimate for business trip WR-16880, issued 29 April 2026. Single page. Signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 812}} {"id": "isc-te-00266-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Wilmwyn Limited", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "30 April 2026"}, "checklist": ["Check that the pack contains a hotel invoice issued within the last 6 months.", "If the claim exceeds the limit that requires director sign-off, also check that the pack contains a director approval slip issued within the last 3 months and signed.", "Check that the pack contains a restaurant receipt issued within the last 6 months.", "Check that the pack contains a taxi fare receipt issued within the last 6 months.", "Check that the pack contains a currency conversion statement issued within the last 6 months."], "submission": {"case": {"name": "Xiu Knoxova", "reference": "HF-82888", "details": ["The claim is below the limit requiring director sign-off."]}, "documents received": ["Conference fee invoice for Xiu Knoxova. Date of issue: 7 July 2025. 1 page.", "Restaurant receipt for Manon Elmopoulos. Date of issue: 29 December 2025. 1 page.", "Taxi fare receipt for Xiu Knoxova. Date of issue: 27 January 2026. 1 page.", "Currency conversion statement for Xiu Knoxova. Date of issue: 22 March 2026. 1 page.", "Hotel invoice for Xiu Knoxova. Date of issue: 14 November 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack satisfies the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-66", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 706}} {"id": "isc-te-00368-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Zervwood & Co", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "1 September 2026"}, "checklist": ["Confirm that the bank charges and interest explanation sheet is included and signed.", "Confirm that the reviewer sign-off sheet for the reconciliation is included and signed.", "Confirm that the general ledger cash account listing is included.", "Confirm that the outstanding payments list is included.", "If the reconciliation shows an unexplained difference that is not an outstanding item, also confirm that the unexplained difference investigation note is included and signed.", "Confirm that the outstanding receipts list is included."], "submission": {"case": {"name": "company bank account PV-89003", "reference": "FU-96762", "details": ["The reconciliation shows an unexplained difference that is not an outstanding item."]}, "documents received": ["Unexplained difference investigation note - PV-89003. The note is dated 9 August 2026, 2 pages, complete. It is signed by the financial controller.", "General ledger cash account listing - PV-89003. The listing is dated 17 May 2026. Only 2 of its 3 pages are included, pages 1-2 of 3.", "Outstanding payments list - PV-89003. The list is dated 30 June 2026 and is 1 page.", "Reviewer sign-off sheet for the reconciliation - PV-89003. The sheet is dated 16 August 2026 and is 1 page. It is signed by the financial controller.", "Bank charges and interest explanation sheet - PV-89003. The sheet is dated 2 August 2026 and is 1 page. It is signed by the financial controller.", "Outstanding receipts list - PV-89003. The list is dated 13 August 2026 and is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00236-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Haskmont Group", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "4 March 2026"}, "checklist": ["Scaffolding agreement, signed", "Insurance notification letter, issued within the last 6 months", "Meter reading photo, issued within the last 1 months", "Grid connection application, issued within the last 12 months, signed", "Planning permission letter, issued within the last 12 months"], "submission": {"case": {"name": "roof OS-53775", "reference": "WL-45574"}, "documents received": ["Planning permission letter for roof OS-53775, dated 18 March 2025. 2 pages, complete.", "Electricity bill direct debit mandate for roof OS-53775, dated 22 November 2025. 2 pages, complete. Signed by the account holder.", "Meter reading photo for roof OS-53775, dated 28 February 2026. Single page.", "Survey booking form for roof OS-53775, dated 3 January 2026. Single page. Signed by the property owner.", "Insurance notification letter for roof OS-53775, dated 29 December 2025. Single page.", "Grid connection application for roof OS-53775, dated 22 November 2025. 2 pages, complete. Signed by the property owner.", "Scaffolding agreement for roof OS-53775, dated 1 February 2026. 2 pages, complete. Signed by the property owner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 752}} {"id": "isc-te-00097-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Quorwater LLP", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "8 April 2026"}, "checklist": ["Bank statement for the period, issued within the last 2 months.", "Bank charges and interest explanation sheet, signed.", "Direct debit mandate report from the bank, issued within the last 3 months.", "Outstanding receipts list.", "Bank reconciliation statement, signed."], "submission": {"case": {"name": "company bank account YA-14391", "reference": "OU-26776"}, "documents received": ["Bank statement for the period covering company bank account YA-14391. Date of issue: 25 March 2026. 4 pages, complete.", "Direct debit mandate report from the bank for company bank account YA-14391. The date of issue is covered by a stamp. 2 pages, complete.", "Outstanding receipts list for company bank account YA-14391. Date of issue: 12 December 2025. Single page.", "Bank reconciliation statement for company bank account YA-14391. Date of issue: 29 March 2026. 2 pages, complete. Signed by the financial controller.", "Bank charges and interest explanation sheet for company bank account YA-14391. Date of issue: 7 February 2026. Single page. Signed by the accountant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 698}} {"id": "isc-te-00393-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Heskbrook Inc", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "3 April 2026"}, "checklist": ["If the property is a listed building, also: listed building consent for the repairs (signed)", "If the flood water reached the upper floor of the property, also: upper floor damage schedule (signed)", "debris removal invoice (issued within the last 6 months)", "buildings insurance policy schedule", "utility supplier's letter confirming the supply was cut off (issued within the last 12 months)", "council flood warning notice (issued within the last 12 months)", "flood claim form (signed)", "drying contractor's certificate of completion (issued within the last 6 months, signed)"], "submission": {"case": {"name": "property RN-72349", "reference": "ME-41465", "details": ["The property is a listed building.", "The flood water reached the upper floor of the property."]}, "documents received": ["Drying contractor's certificate of completion. Dated 9 January 2026 and relating to property RN-72349. 2 pages, complete. Signed by the drying contractor.", "Buildings insurance policy schedule. Dated 3 March 2026 and relating to property RN-72349. 5 pages, complete.", "Utility supplier's letter confirming the supply was cut off. Dated 2 May 2025 and relating to property RN-72349. 1 page.", "Listed building consent for the repairs. Dated 25 February 2026 and relating to property RN-72349. 2 pages, complete. Signed by the listed building consent officer.", "Photographs of flood water in the rooms. Dated 27 March 2026 and relating to property RN-72349. 3 pages, complete.", "Council flood warning notice. Dated 5 June 2025 and relating to property RN-72349. 1 page.", "Upper floor damage schedule. Dated 21 December 2025 and relating to property RN-72349. 3 pages, complete. Signed by the loss adjuster.", "Loss adjuster's inspection report. Dated 12 February 2026 and relating to property RN-72349. 6 pages, complete. Signed by the loss adjuster.", "Flood claim form. Dated 30 January 2026 and relating to property RN-72349. Pages 1-2 included; the total number of pages is not shown anywhere. Signed by the policyholder.", "Debris removal invoice. Dated 17 November 2025 and relating to property RN-72349. 1 page."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack meets the checklist. Go line by line through the checklist, covering every line relevant to this case. To count, a required document must be of the kind listed on the checklist (not a similar one), be about the subject of the case, have all its pages present, be signed wherever the checklist calls for a signature, not be expired on the date of the review, and fall within the issue period the checklist allows. A conditional line applies only when its circumstance is true for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: one or more applicable lines are not satisfied. unclear: no applicable line is clearly unmet, yet at least one cannot be determined from what is shown, such as a needed date, signature or page count being not visible, a document's kind being impossible to tell, or the case details not stating whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels can mislead; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 8, "n_conditional": 2, "n_documents": 10, "verified": false, "misleading_cue": false, "instructions": "variant-37", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1025}} {"id": "isc-te-00066-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Vorndale BV", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "31 July 2026"}, "checklist": ["Confirm the pack includes a medical examination certificate issued within the last 6 months and signed.", "Confirm the pack includes a signed driver declaration of convictions.", "Confirm the pack includes a passport style photograph issued within the last 6 months.", "Confirm the pack includes a photo driving licence that is valid (not expired) on the date of the review.", "Confirm the pack includes a criminal record check issued within the last 3 months.", "Confirm the pack includes a signed licence application form."], "submission": {"case": {"name": "Freya Brodton", "reference": "WI-95367"}, "documents received": ["WI-95367_Brodton_medical_examination_certificate.pdf - Medical examination certificate for Freya Brodton, dated 6 July 2026. 2 pages, complete. Signed by the examining doctor.", "WI-95367_Brodton_licence_application_form.pdf - Licence application form for Freya Brodton, dated 13 May 2026. 6 pages, complete. Signed by the applicant.", "WI-95367_Brodton_police_caution_letter.pdf - Police caution letter from several years ago concerning Freya Brodton, dated 20 June 2026. 6 pages, complete.", "WI-95367_Brodton_photo_driving_licence.pdf - Photo driving licence for Freya Brodton, expiring 29 September 2028. 2 pages, complete.", "WI-95367_Brodton_passport_style_photograph.pdf - Passport style photograph of Freya Brodton, dated 21 July 2026. 1 page.", "WI-95367_Brodton_driver_declaration_of_convictions.pdf - Driver declaration of convictions for Freya Brodton, dated 12 May 2026. 1 page. Signed by Freya Brodton."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 838}} {"id": "isc-te-00378-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Raskgate GmbH", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "1 July 2026"}, "checklist": ["Check that the pack contains a fraud screening result sheet issued within the last 3 months.", "Check that the pack contains a terms of sale acceptance log issued within the last 12 months.", "If the customer claims the item was not as described, also check that the pack contains a product description screenshot archive issued within the last 6 months.", "Check that the pack contains a customer order history extract issued within the last 6 months.", "Check that the pack contains a transaction record printout issued within the last 3 months.", "Check that the pack contains a signature proof of delivery issued within the last 6 months and signed.", "Check that the pack contains a chargeback response form signed."], "submission": {"case": {"name": "disputed transaction VF-44059", "reference": "UL-78187", "details": ["The customer claims the item was not as described."]}, "documents received": ["Product description screenshot archive for disputed transaction VF-44059, dated 12 April 2026. 2 pages, complete.", "Fraud screening result sheet for disputed transaction VF-44059, dated 28 June 2026. Scanned document, 1 page.", "Customer account details page for disputed transaction VF-44059, dated 9 June 2026. Scanned document, 1 page.", "Transaction record printout for disputed transaction VF-44059, dated 20 June 2026. Scanned document, 1 page.", "Chargeback response form for disputed transaction VF-44059, dated 15 June 2026, signed by the payments disputes team lead. 2 pages, complete.", "Signature proof of delivery for disputed transaction VF-44059, dated 24 February 2026. The single page is cropped so that the signature block is cut off, so it is not known whether it is signed.", "Customer order history extract for disputed transaction VF-44059, dated 25 April 2026. 2 pages, complete.", "Terms of sale acceptance log for disputed transaction VF-44059, dated 11 August 2025. Scanned document, 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "partial", "defect": "signature not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 909}} {"id": "isc-te-00307-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Baxwood Group", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "27 May 2026"}, "checklist": ["Confirm the keys handover receipt is present and signed.", "Confirm the signed draft lease is present and signed.", "Confirm the title information document is present.", "Confirm the energy performance certificate is present and valid (not expired) on 27 May 2026.", "If the tenant is a newly formed company, also confirm the signed parent company guarantee is present and signed.", "Confirm the asbestos survey report is present and was issued within the last 12 months.", "Confirm the stamp duty return is present and signed."], "submission": {"case": {"name": "premises BY-30837", "reference": "LN-29332", "details": ["The tenant is a newly formed company."]}, "documents received": ["asbestos-survey-report-BY-30837.pdf — Asbestos survey report for premises BY-30837, issued 26 April 2026. 4 pages, complete.", "keys-handover-receipt-BY-30837.pdf — Keys handover receipt for premises BY-30837, issued 3 April 2026. 1 page. Signed by the landlord's managing agent.", "energy-performance-certificate-BY-30837-e.pdf — Energy performance certificate for premises BY-30837. The expiry date is covered by a stamp and cannot be read. 1 page.", "stamp-duty-return-BY-30837.pdf — Stamp duty return for premises BY-30837, issued 8 March 2026. 2 pages, complete. Signed by the tenant's accountant.", "title-information-document-BY-30837.pdf — Title information document for premises BY-30837, issued 6 February 2026. 3 pages, complete.", "draft-lease-BY-30837-signed.pdf — Signed draft lease for premises BY-30837, dated 29 April 2026. 12 pages, complete. Signed by the tenant.", "company-search-report-BY-30837.pdf — Company search report for premises BY-30837, issued 20 May 2026. 2 pages, complete.", "parent-company-guarantee-BY-30837-signed.pdf — Signed parent company guarantee for premises BY-30837, dated 20 March 2026. 3 pages, complete. Signed by the parent company's authorised signatory."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 970}} {"id": "isc-te-00314-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Marlgard GmbH", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "1 June 2026"}, "checklist": ["If the transfer is an international movement, also: transit customs document (signed)", "load consolidation sheet (issued within the last 3 months, signed)", "seal number log (issued within the last 1 months, signed)", "damaged goods exception sheet (issued within the last 1 months, signed)", "transfer manifest (signed)"], "submission": {"case": {"name": "cross-dock transfer CD-54159", "reference": "GL-47907"}, "documents received": ["inbound_unloading_record_CD-54159.pdf. Inbound unloading record for cross-dock transfer CD-54159, dated 19 May 2026. 1 page. Signed by the inbound unloading team lead.", "seal_number_log_CD-54159.pdf. Seal number log for cross-dock transfer CD-54159, dated 17 May 2026. 1 page. Signed by the depot security officer.", "damaged_goods_exception_sheet_CD-54159.pdf. Damaged goods exception sheet for cross-dock transfer CD-54159, dated 28 May 2026. 1 page. Signed by the warehouse shift supervisor.", "transfer_manifest_CD-54159.pdf. Transfer manifest for cross-dock transfer CD-54159, dated 13 March 2026. 3 pages, complete. Signed by the transport planner.", "load_consolidation_sheet_CD-54159.pdf. Load consolidation sheet for cross-dock transfer CD-54159, dated 25 April 2026. 2 pages, complete. Signed by the load consolidation planner."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document the checklist lists (not one that merely looks similar), it is about the case's subject, it has all its pages, it is signed wherever the checklist asks for a signature, it has not expired on the review date, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents are irrelevant. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-59", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 807}} {"id": "isc-te-00335-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Dravwater Ltd", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "13 May 2026"}, "checklist": ["Check for proof of national insurance number.", "Check for proof of earnings, issued within the last 1 months.", "Check for proof of identity, valid (not expired) on the date of the review.", "Check for rent book or rent payment schedule, issued within the last 2 months.", "Check for proof of savings, issued within the last 2 months.", "Check for current tenancy agreement, signed."], "submission": {"case": {"name": "Daniel Nebbford", "reference": "YX-55936"}, "documents received": ["Current tenancy agreement for Daniel Nebbford. Date of issue: 30 January 2026. 12 pages, complete. Signed by the landlord.", "Proof of national insurance number for Daniel Nebbford. Date of issue: 18 April 2026. 1 page.", "Proof of earnings for Daniel Nebbford. Date of issue: 6 May 2026. 2 pages, complete.", "Proof of identity for Daniel Nebbford. Expiry date: 29 October 2026. 1 page.", "Proof of savings for Daniel Nebbford. Date of issue: 14 April 2026. 2 pages, complete.", "Rent book or rent payment schedule for Daniel Nebbford. Date of issue: 3 May 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 719}} {"id": "isc-te-00417-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Vaskhall Group", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "10 September 2026"}, "checklist": ["Confirm the pack contains proof of deposit savings issued within the last 3 months.", "Confirm the pack contains a property valuation report issued within the last 3 months and signed.", "Confirm the pack contains the three most recent payslips issued within the last 3 months.", "Confirm the pack contains three months of bank statements issued within the last 3 months."], "submission": {"case": {"name": "Simon Foskani", "reference": "JA-60691"}, "documents received": ["JA-60691_passport_Foskani.pdf - Passport for Simon Foskani, expiry date 5 December 2026. 2 pages, complete.", "JA-60691_property-valuation-report_Foskani.pdf - Property valuation report for Simon Foskani, dated 15 June 2026, signed by the valuer. 8 pages, complete.", "JA-60691_bank-statements_Foskani.pdf - Three months of bank statements for Simon Foskani, dated 25 July 2026. 9 pages, complete.", "JA-60691_payslips_Foskani.pdf - Three most recent payslips for Simon Foskani, dated 31 July 2026. 3 pages, complete.", "JA-60691_proof-of-deposit-savings_Foskani.pdf - Proof of deposit savings for Simon Foskani, dated 7 September 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Examine each checklist line that applies here. A required document counts only if it is the kind of document listed (not a similar one), relates to the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can mislead, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-46", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 751}} {"id": "isc-te-00311-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Bravwald & Co", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "18 May 2026"}, "checklist": ["Obtain a racking inspection report issued within the last 12 months and signed.", "Obtain a utilities connection certificate.", "Obtain a signed floor load capacity report.", "If the warehouse site is in a flood risk area, also obtain a signed flood risk assessment.", "Obtain a fire safety certificate that is valid (not expired) on the date of the review.", "Obtain planning permission.", "Obtain an asbestos survey.", "If the warehouse stores food products, also obtain a food storage approval certificate that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "warehouse EG-76741", "reference": "PM-89902", "details": ["The warehouse site is not in a flood risk area.", "The warehouse stores no food products."]}, "documents received": ["Floor load capacity report for warehouse WC-51730, issued on 28 January 2026. 3 pages, complete. Signed by the structural engineer.", "Racking inspection report for warehouse EG-76741, issued on 26 October 2025. 2 pages, complete. Signed by the inspecting engineer.", "Planning permission for warehouse EG-76741, issued on 27 January 2026. 2 pages, complete.", "Fire safety certificate for warehouse EG-76741, with an expiry date of 23 February 2027. 2 pages, complete.", "Signed lease agreement for warehouse EG-76741, issued on 10 March 2026. 8 pages, complete. Signed by the landlord.", "Utilities connection certificate for warehouse EG-76741, issued on 25 March 2026. Single page.", "Asbestos survey for warehouse EG-76741, issued on 26 March 2026. 5 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00282-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Briskmere GmbH", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "18 June 2026"}, "checklist": ["Proof of registered office address, issued within the last 3 months", "Board resolution to open the account, signed", "Company tax registration certificate", "Certificate of incorporation", "If the company operates in a cash-intensive trade, also: cash handling policy, signed"], "submission": {"case": {"name": "Norvhurst SAS", "reference": "HH-86347", "details": ["The company operates in a cash-intensive trade."]}, "cover note": "Please note this pack has already been checked by a colleague on our side. It is forwarded for your review.", "documents received": ["Scanned cash handling policy for Norvhurst SAS, dated 4 May 2026. 2 pages, complete. Signed by the managing director.", "Scanned certificate of incorporation for Norvhurst SAS, dated 10 June 2026. Single page.", "Scanned company tax registration certificate for Norvhurst SAS, dated 25 March 2026. Single page.", "Scanned proof of registered office address for Norvhurst SAS; the date is covered by a stamp and cannot be read. Single page.", "Scanned board resolution to open the account for Norvhurst SAS, dated 3 May 2026. Single page, signed by the chairman of the board."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete: every applicable line is met (extra documents do not matter). Answer incomplete: at least one applicable line is not met. Answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-13", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 718}} {"id": "isc-te-00350-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Pravfell plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "19 August 2026"}, "checklist": ["Check the remediation items list, issued within the last 3 months, signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months, signed.", "Check the follow-up owner assignment sheet, issued within the last 3 months, signed.", "Check the postmortem meeting minutes, issued within the last 3 months, signed.", "Check the customer impact statement, issued within the last 3 months.", "If the incident involved a data leak to an outside party, also: data breach notification record, issued within the last 3 months, signed.", "Check the incident timeline, issued within the last 3 months."], "submission": {"case": {"name": "production incident ZQ-13927", "reference": "EV-82488", "details": ["The incident was caused entirely by internal systems.", "The incident involved a data leak to an outside party."]}, "documents received": ["Data breach notification record for production incident ZQ-13927, issued 20 July 2026, 2 pages, complete, signed by the data protection officer.", "Remediation items list for production incident ZQ-13927, issued 10 June 2026, 2 pages, complete, signed by the incident remediation lead.", "Root cause analysis report for production incident ZQ-13927, issued 11 August 2026, 5 pages, complete, signed by the root cause analysis author.", "Postmortem meeting minutes for production incident ZQ-13927, issued 25 June 2026, 3 pages, complete, signed by the postmortem chair.", "Customer impact statement for production incident ZQ-13927, issued 9 July 2026, 2 pages, complete.", "Incident timeline for production incident ZQ-13927, issued 22 June 2026, 3 pages, complete.", "File scan_0147.pdf: the scan is blank and nothing on it can be seen.", "Follow-up owner assignment sheet for production incident ZQ-13927, issued 28 July 2026, single page, signed by the reliability engineering lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 922}} {"id": "isc-te-00364-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Corvfeld plc", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "8 July 2026"}, "checklist": ["Data migration confirmation, issued within the last 3 months, signed.", "Dependent systems check report, issued within the last 3 months.", "Asset register update, issued within the last 1 month.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed.", "Licence reassignment note, issued within the last 3 months, signed.", "Data wipe certificate, issued within the last 3 months, signed.", "Decommission request form, signed."], "submission": {"case": {"name": "retired server IS-34675", "reference": "HO-82305", "details": ["The server holds no records with retention requirements."]}, "documents received": ["Asset register update for retired server IS-34675, dated 2 July 2026. Single page.", "Final backup confirmation for retired server IS-34675, dated 5 May 2026. Single page. Signed by the backup administrator.", "Decommission request form for retired server IS-34675, dated 17 March 2026. 2 pages, complete. Signed by the requesting team manager.", "Data migration confirmation for retired server IS-34675, dated 27 May 2026. 2 pages, complete. Signed by the operations lead.", "Dependent systems check report for retired server IS-34675, dated 2 July 2026. 3 pages, complete.", "Licence reassignment note for retired server IS-34675, dated 4 May 2026. Single page. Signed by the operations lead.", "Data wipe certificate for retired server IS-34675, dated 26 May 2026. Single page. Signed by the engineer who carried out the wipe."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-50", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 840}} {"id": "isc-te-00104-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Fervford plc", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "25 March 2026"}, "checklist": ["Lost card declaration, signed", "Account statement showing recent activity, issued within the last 1 months", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "Signature verification record, signed", "Delivery address confirmation, signed", "Fraud questionnaire, signed", "Photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Logan Pimberg", "reference": "ZD-97935", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["Account statement - Pimberg ZD-97935.pdf - Account statement showing recent activity concerning Logan Pimberg, dated 15 March 2026. 3 pages, complete.", "Delivery address confirmation - Pimberg ZD-97935.pdf - Delivery address confirmation concerning Logan Pimberg, dated 21 December 2025. Single page. Signed by the cardholder.", "Signature verification record - Pimberg ZD-97935.pdf - Signature verification record concerning Logan Pimberg, dated 19 February 2026. Single page. Signed by a card services officer.", "Lost card declaration - Pimberg ZD-97935.pdf - Lost card declaration concerning Logan Pimberg, dated 15 January 2026. Single page. Signed by the cardholder.", "Fraud questionnaire - Pimberg ZD-97935.pdf - Fraud questionnaire concerning Logan Pimberg, dated 12 February 2026. 2 pages, complete. Signed by the cardholder.", "Photo identification - Pimberg ZD-97935.pdf - Photo identification concerning Logan Pimberg, showing an expiry date of 10 December 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00015-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Ambford Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "15 May 2026"}, "checklist": ["Cancellation policy acceptance, signed", "Employer sponsorship letter, issued within the last 3 months, signed", "Special requirements note", "Venue access instructions, issued within the last 3 months", "Prerequisite certificate"], "submission": {"case": {"name": "course booking WJ-95480", "reference": "PQ-38702"}, "documents received": ["venue-access-instructions-WJ-95480.pdf. Venue access instructions for course booking WJ-95480, issued on 6 April 2026. It is 1 page.", "cancellation-policy-acceptance-WJ-95480.pdf. A cancellation policy acceptance for course booking WJ-95480, issued on 2 February 2026. It is 1 page and signed by the delegate.", "prerequisite-certificate-WJ-95480.pdf. A prerequisite certificate for course booking WJ-95480, issued on 18 January 2026. It is 1 page.", "special-requirements-note-WJ-95480.pdf. A special requirements note for course booking WJ-95480, issued on 3 February 2026. It is 1 page.", "employer-sponsorship-letter-WJ-95480.pdf. An employer sponsorship letter for course booking WJ-95480, issued on 2 March 2026. It is 1 page and signed by the employer's human resources manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 756}} {"id": "isc-te-00243-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ambmont Limited", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "9 June 2026"}, "checklist": ["Check that the pack contains the invoice discrepancy log.", "Check that the pack contains the supplier response letter, issued within the last 3 months and signed.", "Check that the pack contains the quality inspection report, issued within the last 6 months and signed.", "Check that the pack contains the delivery record summary, issued within the last 12 months.", "Check that the pack contains the service level summary, issued within the last 12 months."], "submission": {"case": {"name": "Ilvwood Limited", "reference": "AY-23034"}, "cover note": "Everything needed for this review is attached and complete, so the pack is ready for your confirmation.", "documents received": ["Contract compliance checklist for Ilvwood Limited, dated 3 April 2026. 3 pages, complete. Signed by the contract manager.", "Delivery record summary for Ilvwood Limited, dated 5 March 2026. 2 pages, complete.", "Invoice discrepancy log for Ilvwood Limited, dated 24 March 2026. 2 pages, complete.", "Service level summary for Ilvwood Limited, dated 25 June 2025. Single page.", "Quality inspection report for Ilvwood Limited, dated 7 June 2026. 3 pages, complete. Signed by the quality inspector.", "Supplier response letter for Ilvwood Limited, dated 29 May 2026. Single page; the part where a signature would be cannot be seen, as a sticky note covers the signature block, so it is not known whether it is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Examine each checklist line that applies here. A required document counts only if it is the kind of document listed (not a similar one), relates to the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can mislead, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-46", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 763}} {"id": "isc-te-00147-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Mersheim Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "10 April 2026"}, "checklist": ["If the borrower is self-employed, also include: two most recent tax year overviews, issued within the last 18 months, signed.", "If the property being bought is a flat in a shared building, also include: management company pack, issued within the last 3 months.", "Property valuation report, issued within the last 3 months, signed.", "Three months of bank statements, issued within the last 3 months.", "Three most recent payslips, issued within the last 3 months.", "Passport, valid (not expired) on the date of the review.", "Gifted deposit letter, issued within the last 3 months, signed."], "submission": {"case": {"name": "Charlotte Paskthwaite", "reference": "ZE-83977", "details": ["The borrower is self-employed.", "The property being bought is a flat in a shared building."]}, "documents received": ["Three months of bank statements for Charlotte Paskthwaite. Date of issue: 13 February 2026. 9 pages, complete.", "Gifted deposit letter for Charlotte Paskthwaite. Date of issue: 17 January 2026. Single page. Signed by the person gifting the deposit.", "Management company pack for Charlotte Paskthwaite. Date of issue: 17 February 2026. 12 pages, complete.", "Two most recent tax year overviews for Charlotte Paskthwaite. Date of issue: 17 July 2025. 4 pages, complete. Signed by HMRC, the issuing tax authority.", "Property valuation report for Charlotte Paskthwaite. Date of issue: 3 March 2026. 8 pages, complete. Signed by the surveyor who carried out the valuation.", "P60 tax summary for Charlotte Paskthwaite. Date of issue: 18 November 2025. 2 pages, complete.", "Three most recent payslips for Charlotte Paskthwaite. Date of issue: 13 March 2026. 3 pages, complete.", "Passport for Charlotte Paskthwaite. Expiry date: 13 April 2028. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine whether the pack is complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Mark the pack complete if every applicable line is met (extra documents do not matter). Mark the pack incomplete if at least one applicable line is not met. Mark the pack unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-28", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 915}} {"id": "isc-te-00413-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Quorhaven BV", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "31 July 2026"}, "checklist": ["Confirm the pack contains a store installation guide.", "Confirm the pack contains a flammability test certificate issued within the last 12 months.", "Confirm the pack contains a brand colour specification.", "Confirm the pack contains a shipping manifest issued within the last 1 months.", "Confirm the pack contains a kit contents list.", "Confirm the pack contains a kit cost breakdown issued within the last 3 months and signed."], "submission": {"case": {"name": "merchandising kit BG-68516", "reference": "EJ-95989"}, "documents received": ["Kit cost breakdown for merchandising kit BG-68516, dated 17 July 2026. 2 pages, complete. Signed by the finance manager.", "Store installation guide for merchandising kit BG-68516, dated 29 May 2026. 6 pages, complete.", "Brand colour specification for merchandising kit BG-68516, dated 7 June 2026. Single page.", "Flammability test certificate for merchandising kit BG-68516, dated 17 July 2026. Single page.", "Kit contents list for merchandising kit BG-68516, dated 19 April 2026. 2 pages, complete.", "Waste disposal plan for merchandising kit BG-68516, dated 11 June 2026. Single page.", "Shipping manifest for merchandising kit BG-68516, dated 12 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 782}} {"id": "isc-te-00158-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Yarvgate & Co", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "28 May 2026"}, "checklist": ["Knowledge test pass certificate on file", "Driver declaration of convictions, signed, on file", "Photo driving licence on file, valid on the date of the review and not expired", "Medical examination certificate on file, issued within the last 6 months and signed", "Licence application form on file, signed", "Criminal record check on file, issued within the last 3 months"], "submission": {"case": {"name": "Anna Lundcombe", "reference": "EX-98046"}, "documents received": ["Criminal record check for Anna Lundcombe, dated 15 May 2026. 6 pages, complete.", "Driver declaration of convictions for Anna Lundcombe, dated 8 March 2026. Signed by the driver, Anna Lundcombe. Single page.", "Licence application form for Anna Lundcombe, dated 20 April 2026. 6 pages, complete. Signed by the applicant, Anna Lundcombe.", "Medical examination certificate for Anna Lundcombe, dated 25 May 2026. 2 pages, complete. Signed by the examining doctor.", "Right to work share code printout for Anna Lundcombe, dated 31 March 2026. Single page.", "Knowledge test pass certificate for Anna Lundcombe, dated 21 May 2026. Single page.", "Photo driving licence for Anna Lundcombe, expiring 30 January 2027. Only 1 of its 2 pages included (pages 1-1 of 2)."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 747}} {"id": "isc-te-00315-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Haskwell Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "7 September 2026"}, "checklist": ["Obtain a financial stability statement issued within the last 12 months and signed.", "Obtain a supplier capacity declaration issued within the last 12 months and signed.", "Obtain a supplier corrective action plan issued within the last 6 months and signed.", "Obtain a supplier quality questionnaire issued within the last 12 months and signed."], "submission": {"case": {"name": "Nordlock GmbH", "reference": "XW-60086"}, "cover note": "This pack has already been checked by a colleague before I sent it on to you. Please treat it as the reviewed version for the supplier qualification file.", "documents received": ["Scanned supplier capacity declaration concerning Nordlock GmbH, dated 9 August 2026. 2 pages, complete. Signed by the supplier's operations manager.", "Scanned financial stability statement concerning Nordlock GmbH, dated 12 April 2026. 2 pages, complete. Signed by the supplier's finance director.", "Scanned supplier audit report concerning Nordlock GmbH, dated 6 April 2026. 8 pages, complete. Signed by the lead auditor.", "Scanned supplier quality questionnaire concerning Nordlock GmbH, dated 22 May 2026. 4 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 696}} {"id": "isc-te-00330-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Marlmoor GmbH", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "17 April 2026"}, "checklist": ["Line manager approval, signed", "If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Visa entry requirement printout, issued within the last 3 months", "Flight itinerary quote, issued within the last 1 months", "Travel request form, signed", "If the trip involves travel to a country requiring a visa, also: visa approval letter", "Hotel booking confirmation"], "submission": {"case": {"name": "business trip LT-79663", "reference": "RA-34404", "details": ["The traveller holds a passport of the destination country.", "The trip involves travel to a country requiring a visa."]}, "documents received": ["hotel booking confirmation LT-79663. It is a hotel booking confirmation for business trip LT-79663, dated 25 January 2026. 2 pages, complete.", "visa entry requirement printout LT-79663. It is a visa entry requirement printout for business trip LT-79663, dated 8 February 2026. 2 pages, complete.", "visa approval letter LT-79663. It is a visa approval letter for business trip LT-79663, dated 28 March 2026. 2 pages, complete.", "line manager approval LT-79663. It is a single-page line manager approval for business trip LT-79663, dated 10 March 2026, and it is signed by the traveller's line manager.", "travel request form LT-79663. It is a travel request form for business trip LT-79663, dated 21 March 2026. 2 pages, complete. It is signed by the traveller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 814}} {"id": "isc-te-00389-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Mersstow Partners", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "3 July 2026"}, "checklist": ["Trial period proposal, signed.", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed.", "Impact assessment on the team, signed.", "Flexible working request form, signed.", "Proposed working pattern plan, signed.", "Client or service impact statement, signed."], "submission": {"case": {"name": "Elif Arnstad", "reference": "VD-24090", "details": ["The employee does not have caring responsibilities for a dependent."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["Current working pattern statement - Elif Arnstad - 4 June 2026.pdf. Current working pattern statement concerning Elif Arnstad, dated 4 June 2026. It is 1 page.", "Previous flexible working requests record - Elif Arnstad - 5 December 2025.pdf. Previous flexible working requests record concerning Elif Arnstad, dated 5 December 2025. It is 1 page.", "Trial period proposal - Elif Arnstad - 19 March 2026.pdf. Trial period proposal concerning Elif Arnstad, dated 19 March 2026. It is 1 page and is signed by the line manager.", "Proposed working pattern plan - Elif Arnstad - 17 May 2026.pdf. Proposed working pattern plan concerning Elif Arnstad, dated 17 May 2026. It is 2 pages, complete, and is signed by the line manager.", "Client or service impact statement - Elif Arnstad - 14 June 2026.pdf. Client or service impact statement concerning Elif Arnstad, dated 14 June 2026. It is 1 page and is signed by the service lead.", "Flexible working request form - Elif Arnstad - 24 March 2026.pdf. Flexible working request form concerning Elif Arnstad, dated 24 March 2026. It is 3 pages, complete, and is signed by the employee.", "Impact assessment on the team - Elif Arnstad - 1 May 2026.pdf. Impact assessment on the team concerning Elif Arnstad, dated 1 May 2026. It is 3 pages, complete, and is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 928}} {"id": "isc-te-00374-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Iskgate Limited", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "19 August 2026"}, "checklist": ["Mortgage application form, signed.", "Proof of deposit, issued within the last 3 months.", "If the property is being bought from a family member, also: independent purchase price assessment, issued within the last 3 months, signed.", "Property valuation report, issued within the last 6 months, signed.", "Credit bureau report, issued within the last 1 months.", "Employment certificate, issued within the last 1 months, signed.", "Sale and purchase agreement, signed."], "submission": {"case": {"name": "property HJ-44730", "reference": "BV-35753", "details": ["The property is being bought from a family member."]}, "documents received": ["Proof of deposit - property HJ-44730.pdf. Proof of deposit for property HJ-44730, dated 10 July 2026. Single page.", "Photo identity document - property HJ-44730.pdf. Photo identity document for property HJ-44730, with expiry date 26 April 2028. Single page.", "Mortgage application form - property HJ-44730.pdf. Mortgage application form for property HJ-44730, dated 30 July 2026. 6 pages, complete. Signed by the applicant.", "Credit bureau report - property HJ-44730.pdf. Credit bureau report for property HJ-44730, dated 30 July 2026. 4 pages, complete.", "Sale and purchase agreement - property HJ-44730.pdf. Sale and purchase agreement for property HJ-44730, dated 27 July 2026. 9 pages, complete. Signed by the purchasers.", "Employment certificate - property HJ-44730.pdf. Employment certificate for property HJ-44730, dated 14 August 2026. Single page. Signed by the employer.", "Property valuation report - property HJ-44730.pdf. Property valuation report for property HJ-44730, dated 4 July 2026. 10 pages, complete. Signed by the valuer."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and say whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must concern the subject of the case, all its pages must be present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-0", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 932}} {"id": "isc-te-00076-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Boltshaw LLP", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "13 July 2026"}, "checklist": ["Check the payment gateway technical specification is present in the pack.", "Check the data protection impact assessment is present in the pack, that it was issued within the last 12 months, and that it is signed.", "Check the fraud screening configuration sheet is present in the pack and that it is signed.", "Check the go-live sign-off certificate is present in the pack, that it was issued within the last 1 months, and that it is signed.", "If the gateway will handle recurring subscription payments, also check the subscription billing mandate template is present in the pack and that it is signed.", "Check the test environment transaction log is present in the pack and that it was issued within the last 1 months."], "submission": {"case": {"name": "payment gateway UG-10911", "reference": "RD-95415", "details": ["The gateway will not handle recurring subscription payments."]}, "documents received": ["Go-live sign-off certificate for payment gateway UG-10911, dated 1 July 2026. It is signed by the Payments Team Lead. 1 page.", "Live sales report from the online store for payment gateway UG-10911, dated 3 July 2026. 4 pages, complete.", "Test environment transaction log for payment gateway UG-10911, dated 3 July 2026. 4 pages, complete.", "Data protection impact assessment for payment gateway UG-10911, dated 22 January 2026. It is signed by the Data Protection Officer. 5 pages, complete.", "Payment gateway technical specification for payment gateway UG-10911, dated 10 May 2026. 8 pages, complete.", "Fraud screening configuration sheet for payment gateway UG-10911, dated 26 May 2026. It is signed by the Fraud Screening Lead. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 847}} {"id": "isc-te-00448-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Veystead Inc", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "24 July 2026"}, "checklist": ["Credit card in the driver's name (valid, i.e. not expired, on the date of the review, signed)", "Vehicle condition report (signed)", "Passport (valid, i.e. not expired, on the date of the review, signed)", "If the booking includes crossing a land border, also: cross-border travel permission (signed)", "Booking voucher (issued within the last 6 months)", "Insurance excess waiver certificate (valid, i.e. not expired, on the date of the review)", "Driving licence (valid, i.e. not expired, on the date of the review, signed)"], "submission": {"case": {"name": "Amelia Tadridge", "reference": "LS-38914", "details": ["The booking includes crossing a land border."]}, "documents received": ["Cross-border travel permission, Amelia Tadridge. Date of issue: 28 June 2026. Single page. Signed by the branch counter staff member.", "Driving licence, Amelia Tadridge. Expiry date: 9 December 2026. 2 pages, complete. Signed by the licence holder.", "Additional driver authorisation form, Amelia Tadridge. Date of issue: 6 April 2026. Single page. Signed by the branch manager.", "Insurance excess waiver certificate, Amelia Tadridge. Expiry date: 3 June 2027. 2 pages, complete.", "Fuel policy sheet, Amelia Tadridge. Date of issue: 12 June 2026. Single page. Signed by the branch counter staff member.", "Passport, Amelia Tadridge. Expiry date: 17 February 2028. Single page. Signed by the passport holder.", "Credit card in the driver's name, Amelia Tadridge. Expiry date: 25 February 2028. Single page. The signature block is covered by a sticky note, so it cannot be seen whether the card is signed.", "Vehicle condition report, Amelia Tadridge. Date of issue: 29 April 2026. 2 pages, complete. Signed by the branch counter staff member.", "Booking voucher, Amelia Tadridge. Date of issue: 25 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Your task is to determine whether the pack is complete when measured against the checklist. Go over every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. The answer is complete: every applicable line is met (extra documents do not matter). The answer is incomplete: at least one applicable line is not met. The answer is unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, as they may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "partial", "defect": "signature not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "variant-16", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 924}} {"id": "isc-te-00290-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Raskmore plc", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "17 March 2026"}, "checklist": ["Photographs of the fault, issued within the last 3 months", "Cost estimate, issued within the last 3 months, signed", "Job request form, signed", "Planned completion date sheet, signed", "Location details sheet"], "submission": {"case": {"name": "maintenance request IW-1228", "reference": "EG-89517"}, "documents received": ["Job request form. The form concerns maintenance request IW-1228 and shows a date of issue of 13 February 2026. 1 page. It is signed by the requesting manager.", "Cost estimate. The estimate concerns maintenance request IW-1228 and shows a date of issue of 22 February 2026. 2 pages, complete. It is signed by the estimator.", "Planned completion date sheet. The sheet concerns maintenance request IW-1228 and shows a date of issue of 23 December 2025. 1 page. It is signed by the facilities coordinator.", "Photographs of the fault. The photographs concern maintenance request IW-1228 and show a date of issue of 2 March 2026. 2 pages, complete.", "Location details sheet. The sheet concerns maintenance request IW-1228 and shows a date of issue of 12 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 716}} {"id": "isc-te-00415-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Jaskmouth & Co", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "11 March 2026"}, "checklist": ["Childcare payment receipt, issued within the last 13 months.", "Rental income record.", "Gift aid donation summary.", "Tax return draft printout, signed.", "Pension contribution certificate, issued within the last 13 months.", "Employment income summary, issued within the last 13 months."], "submission": {"case": {"name": "household tax affairs MM-28293", "reference": "OJ-52114"}, "cover note": "My apologies that this pack was put together in a rush.", "documents received": ["Rental income record for household tax affairs MM-28293. Date of issue: 6 December 2025. 4 pages, complete.", "Bank interest statement for household tax affairs MM-28293. Date of issue: 20 December 2025. 3 pages, complete.", "Employment income summary for household tax affairs MM-28293. Date of issue: 23 September 2025. 2 pages, complete.", "Tax return draft printout for household tax affairs MM-28293. Date of issue: 10 December 2025. 6 pages, complete. Signed by the household's tax filer.", "Gift aid donation summary for household tax affairs MM-28293. Date of issue: 10 December 2025. Single page.", "Childcare payment receipt for household tax affairs MM-28293. Date of issue: 5 February 2026. Single page.", "Pension contribution certificate for household tax affairs MM-28293. Date of issue: 9 November 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00047-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Teskbrook GmbH", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "17 March 2026"}, "checklist": ["Check that the audit summary report is present and signed.", "Check that the audit finding sheets are present and signed.", "Check that the internal audit plan is present, was issued within the last 12 months, and is signed.", "Check that the management review minutes are present and signed.", "If the audit found a major non-conformity, also check that the major non-conformity corrective action plan is present and signed."], "submission": {"case": {"name": "internal audit HH-1805", "reference": "IG-20637", "details": ["The audit found a major non-conformity."]}, "cover note": "Please accept my apologies that this pack was put together in a rush. Kind regards, Femke Aldford", "documents received": ["Management review minutes HH-1805. Issued 13 February 2026, 4 pages, complete. Signed by the chair of the review board.", "Audit attendance sheet HH-1805. Issued 8 February 2026, a single page. Signed by the lead auditor.", "Audit finding sheets HH-1805. Issued 1 January 2026, 2 pages, complete. Signed by the lead auditor.", "Major non-conformity corrective action plan HH-1805. Issued 10 December 2025, 3 pages, complete. Signed by the quality manager.", "Internal audit plan HH-1805. Issued 30 March 2025, 2 pages, complete. Signed by the quality manager.", "Audit summary report HH-1805. Issued 3 February 2026, 5 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00282-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Briskmere GmbH", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "18 June 2026"}, "checklist": ["Proof of registered office address, issued within the last 3 months", "Board resolution to open the account, signed", "Company tax registration certificate", "Certificate of incorporation", "If the company operates in a cash-intensive trade, also: cash handling policy, signed"], "submission": {"case": {"name": "Norvhurst SAS", "reference": "HH-86347", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["Scanned beneficial owner identification form for Norvhurst SAS, dated 28 February 2026. 3 pages, complete. Signed by the managing director.", "Scanned proof of registered office address for Norvhurst SAS; the date is covered by a stamp and cannot be read. Single page.", "Scanned cash handling policy for Norvhurst SAS, dated 4 May 2026. 2 pages, complete. Signed by the managing director.", "Scanned company tax registration certificate for Norvhurst SAS, dated 25 March 2026. Single page.", "Scanned board resolution to open the account for Norvhurst SAS, dated 3 May 2026. Single page, signed by the chairman of the board.", "Scanned certificate of incorporation for Norvhurst SAS, dated 10 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 705}} {"id": "isc-te-00191-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Creskley Partners", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "13 August 2026"}, "checklist": ["Obtain a shareholder register extract issued within the last 3 months.", "Obtain a certificate of incorporation.", "Obtain a company tax registration certificate.", "Obtain signed company statutes.", "Obtain proof of registered office address issued within the last 3 months.", "Obtain an authorised signer identity document that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "Yarvholm & Co", "reference": "LC-68396"}, "cover note": "Please could you approve this pack quickly, as all the paperwork is in order.", "documents received": ["CompanyTaxRegistrationCertificate_YarvholmCo_08082026.pdf - Company tax registration certificate for Yarvholm & Co. It shows a date of issue of 8 August 2026. Single page.", "AuthorisedSignerID_YarvholmCo_25062028.pdf - Authorised signer identity document for Yarvholm & Co. It shows an expiry date of 25 June 2028. Single page.", "File_20260813_01.pdf - The file will not open, so its contents cannot be seen.", "ShareholderRegisterExtract_YarvholmCo_10072026.pdf - Shareholder register extract for Yarvholm & Co. It shows a date of issue of 10 July 2026. 2 pages, complete.", "CompanyStatutes_YarvholmCo_04052026.pdf - Company statutes for Yarvholm & Co. It shows a date of issue of 4 May 2026. 12 pages, complete. The statutes are signed by the company's legal representative.", "CertificateOfIncorporation_YarvholmCo_15072026.pdf - Certificate of incorporation for Yarvholm & Co. It shows a date of issue of 15 July 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 853}} {"id": "isc-te-00466-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silberg & Co", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "19 June 2026"}, "checklist": ["Venue access instructions, issued within the last 3 months", "Cancellation policy acceptance, signed", "Payment confirmation, issued within the last 3 months", "Prerequisite certificate", "Delegate photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "course booking EZ-28200", "reference": "MC-76518"}, "documents received": ["Passport-style photo with no official markings for course booking EZ-28200. Expiry date: 31 January 2028. Single page.", "Cancellation policy acceptance for course booking EZ-28200. Date of issue: 19 May 2026. Signed by the delegate. Single page.", "Venue access instructions for course booking EZ-28200. Date of issue: 30 March 2026. Single page.", "Prerequisite certificate for course booking EZ-28200. Date of issue: 10 June 2026. Single page.", "Payment confirmation for course booking EZ-28200. Date of issue: 14 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? That is the question to answer. Work through all checklist lines that bear on this case. For a required document to be counted, it must be the kind of document listed on the checklist (a similar document will not suffice), it must be about the case's subject, it must have all its pages present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued inside the period the checklist allows. A conditional line applies only when the circumstance it sets out holds for the case. complete: every applicable line is met, and extra documents are irrelevant. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one line cannot be decided from what is shown, for example when a needed date, signature or page count is not visible, when a document's kind cannot be told, or when the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-54", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 709}} {"id": "isc-te-00387-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Oxlfell Group", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "22 July 2026"}, "checklist": ["Confirm the pack contains a contact plan for time away.", "Confirm the pack contains a handover note, signed.", "If the employee is requesting leave during a known busy period, also: confirm the pack contains a business case for peak-period leave, signed.", "Confirm the pack contains a team holiday planner extract.", "Confirm the pack contains a manager approval email issued within the last 2 months."], "submission": {"case": {"name": "Gustavo Rookton", "reference": "VB-36010", "details": ["The employee is not requesting leave during a known busy period."]}, "documents received": ["Team holiday planner extract. The extract concerns Gustavo Rookton and shows its date of issue as 11 May 2026. It runs to 2 pages, complete.", "Manager approval email. The email concerns Gustavo Rookton and shows its date of issue as 10 May 2026. It is a single page.", "Handover note. The note concerns Gustavo Rookton and shows its date of issue as 29 May 2026. It runs to 2 pages, complete, and is signed by the employee.", "Contact plan for time away. The plan covers Gustavo Rookton and shows its date of issue as 11 July 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 718}} {"id": "isc-te-00254-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Elvwater BV", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 June 2026"}, "checklist": ["Annual activity report, issued within the last 6 months, signed.", "If the institute received industry funding above the university's disclosure threshold, also: industry funding disclosure statement, issued within the last 12 months, signed.", "Staffing plan, issued within the last 6 months, signed.", "Financial expenditure summary, issued within the last 3 months, signed.", "Doctoral researcher progress summary, issued within the last 6 months, signed.", "Intellectual property register extract, issued within the last 6 months, signed.", "Director's declaration of interests, issued within the last 12 months, signed."], "submission": {"case": {"name": "Wendmere Inc", "reference": "GI-71566"}, "documents received": ["Wendmere Inc financial expenditure summary.pdf - A financial expenditure summary for Wendmere Inc, dated 16 April 2026. It has 3 pages, complete, and is signed by the institute finance officer.", "Wendmere Inc intellectual property register extract.pdf - An intellectual property register extract for Wendmere Inc, dated 11 February 2026. It is a single page and is signed by the head of technology transfer.", "Wendmere Inc staffing plan.pdf - A staffing plan for Wendmere Inc, dated 3 April 2026. It has 2 pages, complete, and is signed by the institute director.", "Wendmere Inc annual activity report.pdf - An annual activity report for Wendmere Inc, dated 2 April 2026. It has 12 pages, complete, and is signed by the institute director.", "Wendmere Inc industry funding disclosure statement.pdf - An industry funding disclosure statement for Wendmere Inc, dated 21 May 2026. It is a single page and is signed by the institute director.", "Wendmere Inc director's declaration of interests.pdf - A director's declaration of interests for Wendmere Inc, dated 28 February 2026. It is a single page and is signed by the institute director.", "Wendmere Inc publications list.pdf - A publications list for Wendmere Inc, dated 7 September 2025. It has 4 pages, complete.", "Wendmere Inc doctoral researcher progress summary.pdf - A doctoral researcher progress summary for Wendmere Inc, dated 22 January 2026. It has 2 pages, complete, and is signed by the doctoral programme coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 942}} {"id": "isc-te-00129-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Austmere Partners", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "31 July 2026"}, "checklist": ["Check that the signed franchise agreement counterpart is signed.", "Check that the franchise application form is signed.", "Check that the operator licence is valid and has not expired on the date of the review.", "Check that the franchise disclosure document receipt was issued within the last 3 months and is signed.", "If the franchisee intends to operate through a company rather than as an individual, also check the shareholder agreement extract is signed.", "Check that the fit-out cost estimate was issued within the last 6 months and is signed."], "submission": {"case": {"name": "Norvberg Inc", "reference": "LJ-79438"}, "documents received": ["Signed franchise agreement counterpart for Norvberg Inc, dated 2 May 2026. 12 pages, complete. Signed by an authorised signatory for the franchisor.", "Fit-out cost estimate for Norvberg Inc, dated 13 May 2026. 4 pages, complete. Signed by an authorised signatory for the franchisee.", "Operator licence for Norvberg Inc, expiry date 5 December 2027. 2 pages, complete.", "Franchise disclosure document receipt for Norvberg Inc, dated 26 July 2026. 1 page. Signed by an authorised signatory for the franchisee.", "Franchise application form for Norvberg Inc, dated 6 May 2026. 3 pages, complete. Signed by an authorised signatory for the franchisee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 741}} {"id": "isc-te-00043-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Austmere LLP", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "2 September 2026"}, "checklist": ["Racking inspection report, issued within the last 12 months and signed.", "Signed lease agreement.", "Planning permission.", "Fire safety certificate, valid (not expired) on the date of the review.", "Asbestos survey."], "submission": {"case": {"name": "warehouse BB-20125", "reference": "KU-84726"}, "documents received": ["BB-20125_asbestos_survey_2026-05-17.pdf. Asbestos survey for warehouse BB-20125, dated 17 May 2026, 5 pages, complete.", "BB-20125_lease_agreement_2026-06-13.pdf. Signed lease agreement for warehouse BB-20125, dated 13 June 2026, 8 pages, complete. It is signed by the landlord and the tenant.", "BB-20125_racking_inspection_report_2026-05-28.pdf. Racking inspection report for warehouse BB-20125, dated 28 May 2026, 2 pages, complete. It is signed by the inspecting engineer.", "BB-20125_floor_load_capacity_report_2026-06-29.pdf. Floor load capacity report for warehouse BB-20125, dated 29 June 2026, 3 pages, complete. It is signed by the structural engineer.", "BB-20125_planning_permission_2026-07-06.pdf. Planning permission for warehouse BB-20125, dated 6 July 2026, 2 pages, complete.", "BB-20125_fire_safety_certificate_expires_2026-10-18.pdf. Fire safety certificate for warehouse BB-20125, with an expiry date of 18 October 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The question to answer is whether the pack stands complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-63", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00097-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Quorwater LLP", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "8 April 2026"}, "checklist": ["Bank statement for the period, issued within the last 2 months.", "Bank charges and interest explanation sheet, signed.", "Direct debit mandate report from the bank, issued within the last 3 months.", "Outstanding receipts list.", "Bank reconciliation statement, signed."], "submission": {"case": {"name": "company bank account YA-14391", "reference": "OU-26776"}, "documents received": ["Outstanding receipts list for company bank account YA-14391. Date of issue: 12 December 2025. Single page.", "Bank charges and interest explanation sheet for company bank account YA-14391. Date of issue: 7 February 2026. Single page. Signed by the accountant.", "Direct debit mandate report from the bank for company bank account YA-14391. Date of issue: 29 December 2025. 2 pages, complete.", "Bank reconciliation statement for company bank account YA-14391. Date of issue: 29 March 2026. 2 pages, complete. Signed by the financial controller.", "Bank statement for the period covering company bank account YA-14391. Date of issue: 25 March 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 702}} {"id": "isc-te-00265-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Ilvvale LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "6 April 2026"}, "checklist": ["Booking voucher, issued within the last 6 months", "Vehicle condition report, signed", "Passport, valid (not expired) on 6 April 2026, signed", "Additional driver authorisation form, signed", "Credit card in the driver's name, valid (not expired) on 6 April 2026, signed", "Driving licence, valid (not expired) on 6 April 2026, signed", "If the booking includes crossing a land border, also: cross-border travel permission, signed"], "submission": {"case": {"name": "Lucy Bixisey", "reference": "OV-98787", "details": ["The booking stays within one country."]}, "cover note": "My colleague has already checked this pack. Please let me know if you need anything further from me.", "documents received": ["booking_voucher_ov98787.pdf — Booking voucher for Lucy Bixisey. It shows its date of issue as 20 December 2025. It is a single page.", "fuel_policy_sheet_ov98787.pdf — Fuel policy sheet for Lucy Bixisey. It shows its date of issue as 20 February 2026. It is a single page. It is signed by the branch counter staff member.", "passport_ov98787.pdf — Passport for Lucy Bixisey. It shows its expiry date as 15 December 2027. It is a single page. It is signed by the passport holder.", "vehicle_condition_report_ov98787.pdf — Vehicle condition report for Lucy Bixisey. It shows its date of issue as 3 March 2026. It is 2 pages, complete. It is signed by the inspecting staff member.", "insurance_excess_waiver_certificate_ov98787.pdf — Insurance excess waiver certificate for Lucy Bixisey. It shows its expiry date as 6 July 2028. It is 2 pages, complete.", "credit_card_ov98787.pdf — Credit card in the driver's name for Lucy Bixisey. It shows its expiry date as 18 November 2026. It is a single page. It is signed by the cardholder.", "driving_licence_ov98787.pdf — Driving licence for Lucy Bixisey. It shows its expiry date as 9 October 2026. It is 2 pages, complete. It is signed by the licence holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 966}} {"id": "isc-te-00228-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lindcourt & Co", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "15 May 2026"}, "checklist": ["Training matrix extract, issued within the last 3 months, signed.", "Calibration status summary, issued within the last 1 months, signed.", "Layout tour plan, signed.", "Audit scope statement, signed.", "Audit agenda, signed.", "Document control list, issued within the last 3 months, signed."], "submission": {"case": {"name": "customer audit visit HY-50028", "reference": "PO-24718"}, "documents received": ["HY-50028_document_control_list.pdf. Document control list for customer audit visit HY-50028, dated 20 March 2026. 4 pages, complete, but a sticky note covers the signature block, so it cannot be seen whether it is signed.", "HY-50028_training_matrix_extract.pdf. Training matrix extract for customer audit visit HY-50028, dated 12 May 2026. 3 pages, complete, with a signature from the Training Coordinator.", "HY-50028_calibration_status_summary.pdf. Calibration status summary for customer audit visit HY-50028, dated 5 May 2026. 2 pages, complete, with a signature from the Quality Manager.", "HY-50028_audit_scope_statement.pdf. Audit scope statement for customer audit visit HY-50028, dated 7 March 2026. Single page, with a signature from the Quality Manager.", "HY-50028_audit_agenda.pdf. Audit agenda for customer audit visit HY-50028, dated 28 March 2026. Single page, with a signature from the Quality Manager.", "HY-50028_previous_audit_findings_closure_file.pdf. Previous audit findings closure file for customer audit visit HY-50028, dated 25 January 2026. 6 pages, complete, with a signature from the Quality Manager.", "HY-50028_layout_tour_plan.pdf. Layout tour plan for customer audit visit HY-50028, dated 8 February 2026. Single page, with a signature from the Facilities Supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 901}} {"id": "isc-te-00352-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Nordston GmbH", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "4 March 2026"}, "checklist": ["If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter (issued within the last 3 months, signed)", "remediation items list (issued within the last 3 months, signed)", "follow-up owner assignment sheet (issued within the last 3 months, signed)", "root cause analysis report (issued within the last 3 months, signed)", "alerting rules review note (issued within the last 3 months)", "customer impact statement (issued within the last 3 months)", "postmortem meeting minutes (issued within the last 3 months, signed)"], "submission": {"case": {"name": "production incident MC-46081", "reference": "MU-34394", "details": ["The incident was caused by a third-party service outage."]}, "cover note": "Everything needed is attached and complete. Please review the pack for MC-46081 before we close the incident. Thanks, Thiago Bixett", "documents received": ["Postmortem meeting minutes for production incident MC-46081, dated 7 February 2026. It is 3 pages, complete, and is signed by the meeting chair.", "Root cause analysis report for production incident MC-46081, dated 7 February 2026. It is 5 pages, complete, and is signed by the lead reliability engineer.", "Incident timeline for production incident MC-46081, dated 17 February 2026. It is 3 pages, complete.", "Alerting rules review note for production incident MC-46081, dated 15 February 2026. It is 2 pages, complete.", "Follow-up owner assignment sheet for production incident MC-46081, dated 3 January 2026. It is 1 page and is signed by the incident manager.", "Vendor outage acknowledgement letter for production incident MC-46081, dated 15 February 2026. It is 1 page and is signed by the vendor's service manager.", "Customer impact statement for production incident MC-46081. The date of issue is smudged and cannot be read. It is 2 pages, complete.", "Remediation items list for production incident MC-46081, dated 2 March 2026. It is 2 pages, complete, and is signed by the remediation lead."]}}, "question": {"type": "choice", "instructions": "You are deciding whether the pack is complete when checked against the checklist. Go through every checklist line that applies to this case. Only if a required document is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows does it count. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves must be judged.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-58", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 963}} {"id": "isc-te-00009-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ivrwater Group", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "31 August 2026"}, "checklist": ["Confirm the pack contains a depreciation schedule for the asset to date.", "Confirm the pack contains signed board or budget holder approval for the disposal.", "Confirm the pack contains a fixed asset register extract for the asset.", "Confirm the pack contains a sales invoice or receipt for the sale proceeds, issued within the last 3 months.", "If the asset is a company car being part-exchanged, also: confirm the pack contains a part-exchange valuation from the dealer, issued within the last 3 months."], "submission": {"case": {"name": "disposed asset VI-76793", "reference": "CJ-14842", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Asset disposal request form for disposed asset VI-76793, dated 14 June 2026. 2 pages, complete, signed by the requesting department manager.", "Board or budget holder approval for the disposal of disposed asset VI-76793, dated 29 June 2026. Single page, signed by the group finance director.", "Sales invoice or receipt for the sale proceeds for disposed asset VI-76793, dated 10 August 2026. Single page.", "Depreciation schedule for the asset to date for disposed asset VI-76793, dated 17 May 2026. 2 pages, complete.", "Fixed asset register extract for the asset for disposed asset VI-76793, dated 17 July 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The verdict complete: every applicable line is met (extra documents do not matter). The verdict incomplete: at least one applicable line is not met. The verdict unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-21", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 772}} {"id": "isc-te-00104-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Fervford plc", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "25 March 2026"}, "checklist": ["Lost card declaration, signed", "Account statement showing recent activity, issued within the last 1 months", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "Signature verification record, signed", "Delivery address confirmation, signed", "Fraud questionnaire, signed", "Photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Logan Pimberg", "reference": "ZD-97935", "details": ["The cardholder is at their home address."]}, "documents received": ["Fraud questionnaire - Pimberg ZD-97935.pdf - Fraud questionnaire concerning Logan Pimberg, dated 12 February 2026. 2 pages, complete. Signed by the cardholder.", "Signature verification record - Pimberg ZD-97935.pdf - Signature verification record concerning Logan Pimberg, dated 19 February 2026. Single page. Signed by a card services officer.", "Photo identification - Pimberg ZD-97935.pdf - Photo identification concerning Logan Pimberg, showing an expiry date of 10 December 2027. Single page.", "Account statement - Pimberg ZD-97935.pdf - Account statement showing recent activity concerning Logan Pimberg, dated 15 March 2026. 3 pages, complete.", "Delivery address confirmation - Pimberg ZD-97935.pdf - Delivery address confirmation concerning Logan Pimberg, dated 21 December 2025. Single page. Signed by the cardholder.", "Lost card declaration - Pimberg ZD-97935.pdf - Lost card declaration concerning Logan Pimberg, dated 15 January 2026. Single page. Signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00002-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Hondford Limited", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "21 May 2026"}, "checklist": ["Firewall change request form, signed.", "Current rule set export, issued within the last 1 month.", "Post-change test plan, signed.", "Peer review checklist, issued within the last 1 month and signed.", "Proposed rule change specification, signed.", "Business justification memo, issued within the last 3 months and signed."], "submission": {"case": {"name": "firewall change DG-58616", "reference": "DU-21666"}, "documents received": ["Business justification memo for change DG-58616. Date of issue: 27 February 2026. Single page. Signed by the requesting business manager.", "Proposed rule change specification for change DG-58616. Date of issue: 12 February 2026. 2 pages, complete. Signed by the senior firewall engineer.", "Post-change test plan for change DG-58616. Date of issue: 27 April 2026. 2 pages, complete. Signed by the test lead.", "Firewall change request form for change DG-58616. Date of issue: 12 April 2026. 3 pages, complete. Signed by the requesting network engineer.", "Peer review checklist for change DG-58616. Date of issue: 14 May 2026. Single page. Signed by the reviewing peer engineer.", "Rollback plan for change DG-58616. Date of issue: 30 March 2026. 2 pages, complete. Signed by the operations lead.", "Current rule set export for change DG-58616. Date of issue: 12 May 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00469-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Faldwater Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "25 May 2026"}, "checklist": ["Confirm the pack contains a prerequisite certificate.", "Confirm the pack contains a signed course booking form.", "If the course leads to a licensed qualification, also confirm the pack contains a signed licence eligibility declaration.", "Confirm the pack contains a signed cancellation policy acceptance.", "Confirm the pack contains a special requirements note.", "Confirm the pack contains an employer sponsorship letter issued within the last 3 months and signed.", "Confirm the pack contains a payment confirmation issued within the last 3 months."], "submission": {"case": {"name": "course booking WV-19849", "reference": "FX-94940", "details": ["The course does not lead to a licensed qualification."]}, "documents received": ["Course booking form for course booking WV-19849. Date of issue: 5 April 2026. 2 pages, complete. Signed by the delegate.", "Payment confirmation for course booking WV-19849. Date of issue: 7 March 2026. 1 page.", "Venue access instructions for course booking WV-19849. Date of issue: 12 May 2026. 1 page.", "Employer sponsorship letter for course booking WV-19849. Date of issue: 6 May 2026. 1 page. Signed by the employer's sponsoring manager.", "Special requirements note for course booking WV-19849. Date of issue: 18 April 2026. 1 page.", "Prerequisite certificate for course booking WV-19849. Date of issue: 28 April 2026. 1 page.", "Cancellation policy acceptance for course booking WV-19849. Date of issue: 2 March 2026. 1 page. Signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 813}} {"id": "isc-te-00003-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Quorfell Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "18 June 2026"}, "checklist": ["Check that the pack includes a signed post-change test plan.", "Check that the pack includes a current rule set export issued within the last 1 month.", "Check that the pack includes a signed firewall change request form.", "Check that the pack includes a peer review checklist issued within the last 1 month and signed."], "submission": {"case": {"name": "firewall change JC-89924", "reference": "GT-12592"}, "documents received": ["jc-89924_peer_review_checklist.pdf. Peer review checklist for firewall change JC-89924, dated 2 June 2026. Single page. Signed by the reviewing network security analyst.", "jc-89924_rollback_plan.pdf. Rollback plan for firewall change JC-89924, dated 8 June 2026. 2 pages, complete. Signed by the lead network security engineer.", "jc-89924_current_rule_set_export.pdf. Current rule set export for firewall change JC-89924, dated 5 June 2026. 8 pages, complete.", "jc-89924_firewall_change_request_form_v2.pdf. Firewall change request form for firewall change JC-89924, dated 15 March 2026. 3 pages, complete. A sticky note covers the signature block, so it is not known whether the form is signed.", "jc-89924_post-change_test_plan.pdf. Post-change test plan for firewall change JC-89924, dated 16 May 2026. 2 pages, complete. Signed by the lead network security engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00384-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Jundburg Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "8 June 2026"}, "checklist": ["Confirm the pack contains the plant room access sign-in sheet.", "Confirm the pack contains the thermostat calibration certificate, issued within the last 12 months.", "Confirm the pack contains the engineer F-gas handling certificate, valid (not expired) on the date of the review.", "Confirm the pack contains the F-gas leak check record, issued within the last 12 months and signed.", "Confirm the pack contains the refrigerant top-up log, issued within the last 1 months and signed.", "Confirm the pack contains the system pressure test results, issued within the last 1 months and signed.", "If refrigerant was added during the service, also confirm the pack contains the refrigerant recovery note, issued within the last 1 months and signed."], "submission": {"case": {"name": "air conditioning system QA-33718", "reference": "FF-66011"}, "documents received": ["Engineer F-gas handling certificate for air conditioning system QA-33718, showing an expiry date of 1 November 2028. 1 page.", "System pressure test results for air conditioning system QA-33718, dated 26 May 2026. 2 pages, complete. Signed by the servicing engineer.", "Thermostat calibration certificate for air conditioning system QA-33718, dated 10 January 2026. 1 page.", "F-gas leak check record for air conditioning system QA-33718, dated 5 October 2025. 2 pages, complete. Signed by the servicing engineer.", "Plant room access sign-in sheet for air conditioning system QA-33718, dated 4 April 2026. 1 page.", "Refrigerant top-up log for air conditioning system QA-33718, dated 31 May 2026. 1 page. Signed by the servicing engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00250-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Istfield & Co", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "4 May 2026"}, "checklist": ["If the institute received industry funding above the university's disclosure threshold, also include: industry funding disclosure statement (issued within the last 12 months, signed)", "Include: director's declaration of interests (issued within the last 12 months, signed)", "Include: external advisory board minutes (issued within the last 12 months, signed)", "Include: staffing plan (issued within the last 6 months, signed)", "If the institute hosts research involving human participants, also include: ethics committee annual return (issued within the last 12 months, signed)", "Include: publications list (issued within the last 12 months)", "Include: annual activity report (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Lombfeld Ltd", "reference": "EI-33164", "details": ["The institute received industry funding above the university's disclosure threshold.", "The institute hosts research involving human participants."]}, "documents received": ["EI-33164_Financial_expenditure_summary_2026-04-14.pdf - Financial expenditure summary for Lombfeld Ltd, dated 14 April 2026. 3 pages, complete. Signed by the finance officer.", "EI-33164_External_advisory_board_minutes_2025-06-18.pdf - External advisory board minutes for Lombfeld Ltd, dated 18 June 2025. 4 pages, complete. Signed by the advisory board chair.", "EI-33164_Staffing_plan_2026-03-31.pdf - Staffing plan for Lombfeld Ltd, dated 31 March 2026. 2 pages, complete. Signed by the institute director.", "EI-33164_Annual_activity_report_2025-11-25.pdf - Annual activity report for Lombfeld Ltd, dated 25 November 2025. 12 pages, complete. Signed by the institute director.", "EI-33164_Publications_list_2025-09-20.pdf - Publications list for Lombfeld Ltd, dated 20 September 2025. 4 pages, complete.", "EI-33164_Ethics_committee_annual_return_2025-12-28.pdf - Ethics committee annual return for Lombfeld Ltd, dated 28 December 2025. 2 pages, complete. Signed by the ethics committee chair.", "EI-33164_Industry_funding_disclosure_statement_2025-11-17.pdf - Industry funding disclosure statement for Lombfeld Ltd, dated 17 November 2025. Single page. Signed by the institute director.", "EI-33164_Directors_declaration_of_interests_2025-05-15.pdf - Director's declaration of interests for Lombfeld Ltd, dated 15 May 2025. Single page. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist. Work through every checklist line that applies to this case. Only a document that is the kind listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows counts as satisfying a required document. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-48", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1098}} {"id": "isc-te-00164-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Pellwick Group", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "15 April 2026"}, "checklist": ["Facility access application form, signed.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed.", "Beam time or instrument booking confirmation.", "Insurance declaration for facility work, issued within the last 12 months, signed.", "Home institution endorsement letter, issued within the last 6 months, signed.", "Experiment safety clearance form, signed."], "submission": {"case": {"name": "Madison Harvberg", "reference": "HI-86494", "details": ["The researcher will work outside standard opening hours."]}, "cover note": "Please accept my apologies that this pack was put together in a rush. I hope it still covers what you need for the review. Best regards, Amelia Ullstad", "documents received": ["facility_access_application_form_harvberg.pdf. A facility access application form for Madison Harvberg, dated 23 February 2026. 2 pages, complete. It is signed by the facility manager.", "scan_015.pdf. The file will not open, so its contents cannot be seen.", "experiment_safety_clearance_form_harvberg.pdf. An experiment safety clearance form for Madison Harvberg, dated 8 April 2026. 3 pages, complete. It is signed by the facility safety officer.", "home_institution_endorsement_letter_harvberg.pdf. A home institution endorsement letter for Madison Harvberg, dated 11 December 2025. It is a single page and is signed by the home institution's head of department.", "radiation_safety_training_certificate_harvberg.pdf. A radiation safety training certificate for Madison Harvberg, dated 18 March 2026. It is a single page and is signed by the radiation protection supervisor.", "beam_time_booking_confirmation_harvberg.pdf. A beam time or instrument booking confirmation for Madison Harvberg, dated 25 December 2025. It is a single page.", "insurance_declaration_facility_work_harvberg.pdf. An insurance declaration for facility work for Madison Harvberg, dated 29 April 2025. It is a single page and is signed by the home institution's insurance officer.", "out_of_hours_access_authorisation_harvberg.pdf. An out-of-hours access authorisation for Madison Harvberg, dated 21 March 2026. It is a single page and is signed by the facility manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "conditional", "defect": "document present (circumstance holds), plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 949}} {"id": "isc-te-00395-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Creskwater Ltd", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "16 September 2026"}, "checklist": ["Default notice previously served, issued within the last 6 months, signed.", "If the defaulting party is a public sector body, also: public sector termination approvals record, issued within the last 3 months, signed.", "Losses calculation statement, issued within the last 1 months, signed.", "Termination clause legal opinion, issued within the last 1 months, signed.", "Termination notice draft, signed.", "Original service agreement copy.", "Cure period expiry calculation, issued within the last 1 months, signed."], "submission": {"case": {"name": "Kaldbury GmbH", "reference": "XV-18490", "details": ["The defaulting party is a private company."]}, "documents received": ["Termination notice draft - Kaldbury GmbH.pdf. This is the termination notice draft about Kaldbury GmbH, dated 13 July 2026. It is 2 pages, complete, and signed by the head of legal.", "Termination clause legal opinion - Kaldbury GmbH.pdf. This is the termination clause legal opinion about Kaldbury GmbH, dated 8 September 2026. It is 5 pages, complete, and signed by external counsel.", "Default notice - Kaldbury GmbH.pdf. This is the default notice previously served about Kaldbury GmbH, dated 8 June 2026, a single page, signed by the contract manager.", "Original service agreement copy - Kaldbury GmbH.pdf. This is the original service agreement copy about Kaldbury GmbH, dated 9 June 2026. It is 10 pages, complete.", "Cure period expiry calculation - Kaldbury GmbH.pdf. This is the cure period expiry calculation about Kaldbury GmbH, dated 14 September 2026. It is 2 pages, complete, and signed by the contract manager.", "Losses calculation statement - Kaldbury GmbH.pdf. This is the losses calculation statement about Kaldbury GmbH, dated 26 August 2026. It is 3 pages, complete, and signed by the finance director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 864}} {"id": "isc-te-00014-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ambton SAS", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "15 June 2026"}, "checklist": ["Proof of deposit, issued within the last 3 months", "Sale and purchase agreement, signed", "Credit bureau report, issued within the last 1 months", "Property valuation report, issued within the last 6 months and signed", "If the property is being bought from a family member, also: independent purchase price assessment, issued within the last 3 months and signed", "Mortgage application form, signed", "Bank statement, issued within the last 3 months"], "submission": {"case": {"name": "property NI-98706", "reference": "PN-38882", "details": ["The property is being bought from a family member."]}, "documents received": ["Sale and purchase agreement for property NI-98706. Date of issue: 17 May 2026. 9 pages, complete. Signed by the buyer and the seller.", "Property valuation report for property NI-98706. Date of issue: 12 March 2026. 10 pages, complete. Signed by the valuer.", "Independent purchase price assessment for property NI-98706. Date of issue: 17 May 2026. 2 pages, complete. Signed by the assessor.", "File 0392.pdf: the file will not open, so its contents cannot be seen.", "Proof of deposit for property NI-98706. Date of issue: 7 April 2026. 1 page.", "Credit bureau report for property NI-98706. Date of issue: 5 June 2026. 4 pages, complete.", "Bank statement for property NI-98706. Date of issue: 16 May 2026. 3 pages, complete.", "Photo identity document for property NI-98706. Expiry date: 23 December 2026. 1 page.", "Mortgage application form for property NI-98706. Date of issue: 25 April 2026. 6 pages, complete. Signed by the applicant."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Step through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete if every applicable line is met (extra documents do not matter). Reply incomplete if at least one applicable line is not met. Reply unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, which may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "document present (circumstance holds), plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "variant-27", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 890}} {"id": "isc-te-00253-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Thalmont plc", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "28 July 2026"}, "checklist": ["Cost-benefit justification included.", "If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review.", "Grant fund eligibility note included, issued within the last 6 months, signed.", "Vendor quotation included, issued within the last 3 months.", "If the equipment is above the major purchase threshold, also: tender waiver justification, signed.", "Maintenance plan included."], "submission": {"case": {"name": "equipment ZW-36248", "reference": "IQ-19665", "details": ["The equipment uses no radioactive sources.", "The equipment is below the major purchase threshold."]}, "cover note": "Please find the approval pack for reference IQ-19665. Everything needed is attached and complete.", "documents received": ["Maintenance plan for equipment ZW-36248, dated 15 April 2026. 2 pages, complete.", "Vendor quotation for equipment ZW-36248, dated 19 June 2026. Only page 1 of 2 is included.", "Equipment purchase request form for equipment ZW-36248, dated 10 May 2026, 2 pages, complete. Signed by the requesting department head.", "Grant fund eligibility note for equipment ZW-36248, dated 8 February 2026, 1 page. Signed by the research grants officer.", "Cost-benefit justification for equipment ZW-36248, dated 4 June 2026. 3 pages, complete.", "Installation requirements note for equipment ZW-36248, dated 14 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 795}} {"id": "isc-te-00139-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Ilvmere GmbH", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "25 May 2026"}, "checklist": ["Open corrective action list, issued within the last 1 months, signed", "Previous audit findings closure file, signed", "Audit scope statement, signed", "Layout tour plan, signed", "Training matrix extract, issued within the last 3 months, signed", "If the audit covers the laboratory, also: laboratory competence scope statement, issued within the last 12 months, signed", "Calibration status summary, issued within the last 1 months, signed"], "submission": {"case": {"name": "customer audit visit VI-63754", "reference": "SW-72463", "details": ["The audit does not cover the laboratory."]}, "documents received": ["VI-63754_audit_scope_statement.pdf - Audit scope statement for customer audit visit VI-63754. Date of issue: 9 March 2026. Single page. Signed by the quality management representative.", "VI-63754_training_matrix_extract.pdf - Training matrix extract for customer audit visit VI-63754. Date of issue: 28 April 2026. 3 pages, complete. Signed by the quality management representative.", "VI-63754_previous_audit_findings_closure_file.pdf - Previous audit findings closure file for customer audit visit VI-63754. Date of issue: 19 April 2026. 6 pages, complete. Signed by the quality management representative.", "VI-63754_layout_tour_plan.pdf - Layout tour plan for customer audit visit VI-63754. Date of issue: 15 February 2026. Single page. Signed by the quality management representative.", "VI-63754_open_corrective_action_list.pdf - Open corrective action list for customer audit visit VI-63754. Date of issue: 8 May 2026. 2 pages, complete. Signed by the quality management representative.", "VI-63754_calibration_status_summary.pdf - Calibration status summary for customer audit visit VI-63754. Date of issue: 17 May 2026. 2 pages, complete. Signed by the quality management representative.", "VI-63754_document_control_list.pdf - Document control list for customer audit visit VI-63754. Date of issue: 21 March 2026. 4 pages, complete. Signed by the quality management representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 953}} {"id": "isc-te-00260-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Baxcrest SAS", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "1 May 2026"}, "checklist": ["Alternatives considered table", "Cost estimate sheet, issued within the last 6 months", "Capacity and load estimate, issued within the last 6 months", "Migration and rollout plan", "Proposed architecture diagram"], "submission": {"case": {"name": "design document UZ-54491", "reference": "GO-74704"}, "documents received": ["uz54491_proposed_architecture_diagram.pdf - Proposed architecture diagram for design document UZ-54491. Date of issue: 2 February 2026. Single page.", "uz54491_migration_and_rollout_plan.pdf - Migration and rollout plan for design document UZ-54491. Date of issue: 12 March 2026. 3 pages, complete.", "uz54491_capacity_and_load_estimate.pdf - Capacity and load estimate for design document UZ-54491. Date of issue: 20 December 2025. 3 pages, complete.", "uz54491_cost_estimate_sheet.pdf - Cost estimate sheet for design document UZ-54491. Date of issue: 13 February 2026. 2 pages, complete.", "uz54491_review_board_feedback_summary.pdf - Review board feedback summary for design document UZ-54491. Date of issue: 2 April 2026. 2 pages, complete. Signed by the architecture review board chair."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack satisfies the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-66", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 747}} {"id": "isc-te-00480-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Zervshaw Inc", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "29 June 2026"}, "checklist": ["Photographs of flood water in the rooms, issued within the last 1 months", "Flood claim form, signed", "Loss adjuster's inspection report, issued within the last 6 months and signed", "Council flood warning notice, issued within the last 12 months", "If the property is a listed building, also: listed building consent for the repairs, signed", "Debris removal invoice, issued within the last 6 months"], "submission": {"case": {"name": "property TS-49863", "reference": "IK-32131", "details": ["The property is a listed building."]}, "documents received": ["Photographs of flood water in the rooms relating to property TS-49863, dated 26 June 2026. 3 pages, complete.", "Listed building consent for the repairs at property TS-49863, dated 2 June 2026. 2 pages, complete. Signed by the council planning officer.", "Buildings insurance policy schedule for property TS-49863, dated 17 June 2026. 5 pages, complete.", "Loss adjuster's inspection report for property TS-49863, dated 10 April 2026. 6 pages, complete. Signed by the loss adjuster.", "Council flood warning notice for property TS-49863, dated 16 August 2025. 1 page.", "Debris removal invoice for property TS-49863, dated 15 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 771}} {"id": "isc-te-00021-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Veybrook Group", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "18 March 2026"}, "checklist": ["Movers insurance certificate, valid (not expired) on the date of the review.", "Furniture inventory list, issued within the last 1 months, signed.", "New floor snagging list, issued within the last 1 months, signed.", "Lifting equipment inspection report, issued within the last 6 months, signed.", "Signed move plan, signed.", "Parking bay suspension approval, issued within the last 1 months, signed."], "submission": {"case": {"name": "office move project LO-48164", "reference": "TD-37447"}, "cover note": "Everything needed is attached and complete. Please review the pack ahead of the move.", "documents received": ["Furniture inventory list for office move project LO-48164. It shows its date of issue as 4 March 2026. It is 4 pages, complete. It is signed by the facilities coordinator.", "Movers insurance certificate for office move project LO-48164. It shows its expiry date as 7 October 2027. It is a single page.", "Parking bay suspension approval for office move project LO-48164. It shows its date of issue as 1 March 2026. It is a single page. It is signed by the highways officer.", "Lifting equipment inspection report for office move project LO-48164. It shows its date of issue as 13 January 2026. It is 2 pages, complete. It is signed by the lifting equipment inspector.", "IT decommissioning certificate for office move project LO-48164. It shows its date of issue as 14 March 2026. It is a single page. It is signed by the IT support lead.", "Draft move plan with no approval signature for office move project LO-48164. It shows its date of issue as 22 February 2026. It is 6 pages, complete. It is signed by the move project manager.", "New floor snagging list for office move project LO-48164. It shows its date of issue as 14 March 2026. It is 3 pages, complete. It is signed by the site inspector."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 913}} {"id": "isc-te-00141-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Aldholm plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "7 July 2026"}, "checklist": ["Confirm the pack includes the account closure procedure.", "Confirm the pack includes the account request form, signed.", "Confirm the pack includes the naming convention approval, signed.", "If the account will be run by an external agency, also: confirm the pack includes the agency access agreement, signed.", "Confirm the pack includes the content escalation route, signed.", "Confirm the pack includes the platform terms acceptance record, signed.", "Confirm the pack includes the two-factor authentication confirmation, issued within the last 3 months."], "submission": {"case": {"name": "new social media account SA-68108", "reference": "VD-16282", "details": ["The account will be run entirely by in-house staff."]}, "cover note": "Please could you approve this pack as quickly as possible, as all the paperwork is in order. Thanks, Claire Ebbisey", "documents received": ["A single-page platform terms acceptance record for new social media account SA-68108, dated 9 June 2026, signed by the account owner.", "A single-page content escalation route for new social media account SA-68108, dated 25 April 2026, signed by the communications manager.", "A single-page admin access list for new social media account SA-68108, dated 18 May 2026.", "A single-page naming convention approval for new social media account SA-68108, dated 19 May 2026, signed by the social media governance team lead.", "A single-page account closure procedure for new social media account SA-68108, dated 22 March 2026.", "A single-page account request form for new social media account SA-68108, dated 5 April 2026, signed by the requesting manager.", "A single-page password policy document for new social media account SA-68108, dated 26 May 2026."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 853}} {"id": "isc-te-00097-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Quorwater LLP", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "8 April 2026"}, "checklist": ["Bank statement for the period, issued within the last 2 months.", "Bank charges and interest explanation sheet, signed.", "Direct debit mandate report from the bank, issued within the last 3 months.", "Outstanding receipts list.", "Bank reconciliation statement, signed."], "submission": {"case": {"name": "company bank account YA-14391", "reference": "OU-26776"}, "documents received": ["Reviewer sign-off sheet for the reconciliation of company bank account YA-14391. Date of issue: 26 January 2026. Single page. Signed by the reviewer.", "Bank charges and interest explanation sheet for company bank account YA-14391. Date of issue: 7 February 2026. Single page. Signed by the accountant.", "Bank statement for the period covering company bank account YA-14391. Date of issue: 25 March 2026. 4 pages, complete.", "Outstanding receipts list for company bank account YA-14391. Date of issue: 12 December 2025. Single page.", "General ledger cash account listing for company bank account YA-14391. Date of issue: 13 December 2025. 3 pages, complete.", "Direct debit mandate report from the bank for company bank account YA-14391. Date of issue: 26 March 2025. 2 pages, complete.", "Bank reconciliation statement for company bank account YA-14391. Date of issue: 29 March 2026. 2 pages, complete. Signed by the financial controller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 782}} {"id": "isc-te-00135-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Corvburg plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "16 September 2026"}, "checklist": ["Certified quality management system certificate, valid (not expired) on the date of the review.", "Supplier audit report, issued within the last 24 months, signed.", "Supplier self-assessment report, issued within the last 12 months, signed.", "Supplier corrective action plan, issued within the last 6 months, signed."], "submission": {"case": {"name": "Larvhall Ltd", "reference": "DV-11392"}, "documents received": ["Supplier quality questionnaire for Larvhall Ltd, issued 31 July 2026, 4 pages, complete. Signed by the Larvhall quality manager.", "Supplier self-assessment report for Larvhall Ltd, issued 17 March 2026, 6 pages, complete. Signed by the Larvhall quality manager.", "Supplier audit report for Larvhall Ltd, issued 14 August 2026, 8 pages, complete. Signed by the lead auditor.", "Supplier corrective action plan for Larvhall Ltd, issued 26 June 2026, 3 pages, complete. Signed by the Larvhall quality manager.", "Single-page certified quality management system certificate for Larvhall Ltd, showing an expiry date of 20 May 2028.", "Financial stability statement for Larvhall Ltd, issued 15 May 2026, 2 pages, complete. Signed by the Larvhall finance director."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 541}} {"id": "isc-te-00452-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Bravhaven Inc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "12 August 2026"}, "checklist": ["Leaver notification form, signed.", "Final payroll cut-off note, signed, issued within the last 1 months.", "Line manager confirmation, signed, issued within the last 1 months.", "Shared mailbox handover record, signed, issued within the last 1 months.", "Access rights inventory, issued within the last 1 months.", "Service desk ticket closure summary, issued within the last 1 months."], "submission": {"case": {"name": "Andrew Vellcombe", "reference": "CI-98740"}, "cover note": "Hi, I am sending on the leaver pack for reference CI-98740, which a colleague on the team has already checked. Please let me know if you need anything else from me. Best wishes, Burak Rumisey", "documents received": ["Final payroll cut-off note for Andrew Vellcombe, dated 22 July 2026. Single page. Signed by the payroll officer.", "Leaver notification form for Andrew Vellcombe, dated 3 May 2026. 2 pages, complete. Signed by the line manager.", "Line manager confirmation for Andrew Vellcombe, dated 26 July 2026. Single page. Signed by the line manager.", "Non-disclosure reminder acknowledgement for Andrew Vellcombe, dated 8 June 2026. Single page. Signed by the departing employee.", "Equipment return receipt for Andrew Vellcombe, dated 1 August 2026. Single page. Signed by the IT asset coordinator.", "Service desk ticket closure summary for Andrew Vellcombe. The date is smudged and cannot be read. 3 pages, complete.", "Shared mailbox handover record for Andrew Vellcombe, dated 31 July 2026. 2 pages, complete. Signed by the shared mailbox administrator.", "Access rights inventory for Andrew Vellcombe, dated 24 July 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00162-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Stromhurst Inc", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "22 June 2026"}, "checklist": ["Photo identity document, valid (not expired) on the date of the review", "Experiment safety clearance form, signed", "If the researcher will bring their own samples, also: Sample import declaration for facility, signed", "Radiation safety training certificate, issued within the last 24 months, signed", "Host scientist invitation letter, issued within the last 6 months, signed", "Facility access application form, signed"], "submission": {"case": {"name": "Siobhan Nebbaker", "reference": "YX-47968", "details": ["The researcher will bring their own samples."]}, "documents received": ["Experiment safety clearance form for Siobhan Nebbaker. Date of issue: 10 March 2026. 3 pages, complete. Signed by the facility safety officer.", "Sample import declaration for facility for Siobhan Nebbaker. Date of issue: 16 May 2026. 2 pages, complete. Signed by the visiting researcher.", "Host scientist invitation letter for Siobhan Nebbaker. Date of issue: 26 April 2026. Single page. Signed by the host scientist.", "Photo identity document for Siobhan Nebbaker. Expiry date: 14 December 2025. Single page.", "Radiation safety training certificate for Siobhan Nebbaker. Date of issue: 21 October 2025. Single page. Signed by the radiation safety training coordinator.", "Photo identity document for Siobhan Nebbaker. Expiry date: 30 June 2026. Single page.", "Facility access application form for Siobhan Nebbaker. Date of issue: 27 March 2026. 2 pages, complete. Signed by the visiting researcher.", "Insurance declaration for facility work for Siobhan Nebbaker. Date of issue: 25 December 2025. Single page. Signed by the visiting researcher's home institution insurance officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 851}} {"id": "isc-te-00175-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Selvlund SAS", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "2 July 2026"}, "checklist": ["Check that the expense claim form is signed.", "If the claim exceeds the limit that requires director sign-off, also: check for a director approval slip issued within the last 3 months and signed.", "Check for a train ticket receipt.", "Check for a conference fee invoice issued within the last 12 months.", "Check for a currency conversion statement issued within the last 6 months."], "submission": {"case": {"name": "Sarah Quillley", "reference": "FZ-65007", "details": ["The claim is below the limit requiring director sign-off."]}, "documents received": ["Expense claim form - Sarah Quillley.pdf - A 2-page expense claim form for Sarah Quillley, dated 17 May 2026. 2 pages, complete. It has been signed by Sarah Quillley.", "Train ticket receipt - Sarah Quillley.pdf - A single-page train ticket receipt for Sarah Quillley, dated 4 April 2026.", "Currency conversion statement - Sarah Quillley.pdf - A single-page currency conversion statement for Sarah Quillley, dated 21 April 2026.", "Conference fee invoice - Sarah Quillley.pdf - A single-page conference fee invoice for Sarah Quillley, dated 14 December 2025."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Look at each checklist line that applies to this case. A required document will only count if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Where a line is conditional, it applies only when its circumstance holds for the case. Give the answer complete: every applicable line is met (extra documents do not matter). Give the answer incomplete: at least one applicable line is not met. Give the answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-17", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 710}} {"id": "isc-te-00163-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Fervbrook Limited", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "13 August 2026"}, "checklist": ["Doctoral researcher progress summary, issued within the last 6 months and signed.", "Financial expenditure summary, issued within the last 3 months and signed.", "If the institute hosts research involving human participants, also: ethics committee annual return, issued within the last 12 months and signed.", "Intellectual property register extract, issued within the last 6 months and signed.", "External advisory board minutes, issued within the last 12 months and signed.", "Annual activity report, issued within the last 6 months and signed.", "Staffing plan, issued within the last 6 months and signed."], "submission": {"case": {"name": "Arvmont Inc", "reference": "QZ-81186", "details": ["The institute hosts research involving human participants."]}, "documents received": ["Doctoral researcher progress summary for Arvmont Inc, dated 30 July 2026; 2 pages, complete. Signed by the supervising professor.", "External advisory board minutes for Arvmont Inc, dated 3 February 2026; 4 pages, complete. Signed by the board secretary.", "Annual activity report for Arvmont Inc, dated 7 May 2026; pages 1-4 of 12 are included. Signed by the institute director.", "Financial expenditure summary for Arvmont Inc, dated 29 May 2026; 3 pages, complete. Signed by the institute finance officer.", "Staffing plan for Arvmont Inc, dated 27 February 2026; 2 pages, complete. Signed by the institute director.", "Intellectual property register extract for Arvmont Inc, dated 10 April 2026; 1 page. Signed by the register keeper.", "Ethics committee annual return for Arvmont Inc, dated 21 May 2026; 2 pages, complete. Signed by the ethics committee chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00440-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vornshaw Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "26 June 2026"}, "checklist": ["Check that the pack contains the proposed architecture diagram.", "Check that the pack contains the review board feedback summary, issued within the last 3 months and signed.", "Check that the pack contains the security threat model, issued within the last 6 months.", "If the design introduces a new third-party dependency, also check that the pack contains the third-party dependency risk assessment, issued within the last 6 months and signed.", "Check that the pack contains the alternatives considered table.", "Check that the pack contains the cost estimate sheet, issued within the last 6 months."], "submission": {"case": {"name": "design document HR-11465", "reference": "YD-70116", "details": ["The design introduces no new third-party dependency."]}, "documents received": ["HR-11465 proposed architecture diagram 27 May 2026.pdf - Proposed architecture diagram about design document HR-11465, showing a date of issue of 27 May 2026. A single page.", "HR-11465 security threat model 28 April 2026.pdf - Security threat model about design document HR-11465, showing a date of issue of 28 April 2026. 4 pages, complete.", "HR-11465 cost estimate sheet 28 February 2026.pdf - Cost estimate sheet about design document HR-11465, showing a date of issue of 28 February 2026. 2 pages, complete.", "HR-11465 alternatives considered table 4 March 2026.pdf - Alternatives considered table about design document HR-11465, showing a date of issue of 4 March 2026. 2 pages, complete.", "HR-11465 review board feedback summary 17 May 2026.pdf - Review board feedback summary about design document HR-11465, showing a date of issue of 17 May 2026. 2 pages, complete. Signed by the architecture review board chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 881}} {"id": "isc-te-00245-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Silvik Ltd", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "1 April 2026"}, "checklist": ["Support plan, signed.", "Safeguarding referral form, issued within the last 12 months, signed.", "Benefit entitlement letters, issued within the last 12 months.", "Recent bank statements, issued within the last 3 months.", "Capacity assessment record, signed."], "submission": {"case": {"name": "Anna Holtard", "reference": "TU-70173"}, "documents received": ["Safeguarding referral form. A safeguarding referral form for Anna Holtard, dated 29 September 2025. 2 pages, complete. Signed by the safeguarding officer.", "Capacity assessment record. A capacity assessment record for Anna Holtard, dated 7 March 2026. 4 pages, complete. Signed by the approved mental capacity assessor.", "Recent bank statements. Recent bank statements for Anna Holtard, dated 27 January 2026. 8 pages, complete.", "Support plan. A support plan for Anna Holtard, dated 21 December 2025. 6 pages, complete. Signed by the lead social worker.", "File TU-70173-08. The scan is blank and too faint, so its contents cannot be seen.", "Needs assessment report. A needs assessment report for Anna Holtard, dated 13 January 2026. 12 pages, complete. Signed by the assessing social worker.", "Benefit entitlement letters. Benefit entitlement letters for Anna Holtard, dated 17 July 2025. 2 pages, complete.", "Financial assessment form. A financial assessment form for Anna Holtard, dated 31 January 2026. 6 pages, complete. Signed by the financial assessment officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 795}} {"id": "isc-te-00052-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Yarvham GmbH", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "7 May 2026"}, "checklist": ["Naming convention approval, signed", "Account purpose statement", "Platform terms acceptance record, signed", "Two-factor authentication confirmation issued within the last 3 months", "If the account will be run by an external agency, also: agency access agreement, signed", "If the account will post content about financial products, also: financial promotions approval note, signed and issued within the last 3 months", "Account request form, signed", "Content escalation route, signed"], "submission": {"case": {"name": "new social media account AR-54483", "reference": "HK-37859", "details": ["The account will be run entirely by in-house staff.", "The account will post content about financial products."]}, "documents received": ["Naming convention approval AR-54483.pdf. This is a single-page naming convention approval for new social media account AR-54483, dated 27 April 2026, and it is signed by the social media governance lead.", "Account purpose statement AR-54483.pdf. This is a single-page account purpose statement for new social media account AR-54483, dated 28 January 2026.", "Content escalation route AR-54483.pdf. This is a single-page content escalation route for new social media account AR-54483, dated 13 April 2026, and it is signed by the social media governance lead.", "Platform terms acceptance record AR-54483.pdf. This is a single-page platform terms acceptance record for new social media account AR-54483, dated 26 February 2026, and it is signed by the social media governance lead.", "Two-factor authentication confirmation AR-54483 25 February 2026.pdf. This is a single-page two-factor authentication confirmation for new social media account AR-54483, dated 25 February 2026.", "Two-factor authentication confirmation AR-54483 28 February 2025.pdf. This is a single-page two-factor authentication confirmation for new social media account AR-54483, dated 28 February 2025.", "Account request form AR-54483.pdf. This is a single-page account request form for new social media account AR-54483, dated 21 February 2026, and it is signed by the requesting marketing manager.", "Financial promotions approval note AR-54483.pdf. This is a financial promotions approval note for new social media account AR-54483, dated 24 April 2026. It is 2 pages, complete, and it is signed by the financial promotions approver."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1023}} {"id": "isc-te-00264-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vaskwyn SAS", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "3 July 2026"}, "checklist": ["If the mobile app release adds a new payment feature, also include: payment provider compliance checklist (issued within the last 3 months, signed)", "Release notes (issued within the last 1 months)", "Crash-free rate report (issued within the last 1 months)", "Marketing screenshot pack", "Age rating questionnaire (signed)", "Device compatibility matrix (issued within the last 3 months)"], "submission": {"case": {"name": "mobile app release GK-82707", "reference": "VU-56351", "details": ["The mobile app release adds a new payment feature."]}, "documents received": ["marketing_screenshots_GK-82707.pdf — Marketing screenshot pack for mobile app release GK-82707. Date of issue: 24 May 2026. 6 pages, complete.", "release_notes_GK-82707.pdf — Release notes for mobile app release GK-82707. Date of issue: 1 July 2026. 2 pages, complete.", "crash_free_rate_report_GK-82707.pdf — Crash-free rate report for mobile app release GK-82707. Date of issue: 24 June 2026. Single page.", "age_rating_questionnaire_GK-82707.pdf — Age rating questionnaire for mobile app release GK-82707. Date of issue: 24 March 2026. 2 pages, complete. Signed by the product owner.", "device_compatibility_matrix_GK-82707.pdf — Device compatibility matrix for mobile app release GK-82707. Date of issue: 30 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00310-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Pellcombe GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "28 August 2026"}, "checklist": ["Asbestos survey", "If the warehouse stores food products, also: food storage approval certificate, valid (not expired) on the date of the review", "Planning permission", "Racking inspection report, issued within the last 12 months, signed", "Fire safety certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "warehouse TI-60354", "reference": "YI-31010", "details": ["The warehouse stores food products."]}, "cover note": "I would be grateful for a quick approval, as all the paperwork is in order.", "documents received": ["Fire safety certificate for warehouse TI-60354, showing an expiry date of 25 June 2028. 2 pages, complete.", "Utilities connection certificate for warehouse TI-60354, dated 21 May 2026. Single page.", "Warehouse insurance policy for warehouse TI-60354, showing an expiry date of 7 December 2026. 6 pages, complete.", "Food storage approval certificate for warehouse TI-60354, showing an expiry date of 7 February 2029. Single page.", "Asbestos survey for warehouse TI-60354, dated 15 July 2026. 5 pages, complete.", "Planning permission for warehouse TI-60354, dated 30 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The task is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-51", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 757}} {"id": "isc-te-00024-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lindgard BV", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "15 September 2026"}, "checklist": ["New floor snagging list, issued within the last 1 month and signed", "If the move takes place over a weekend, also: weekend security cover booking form, signed", "Crate hire agreement, signed", "Furniture inventory list, issued within the last 1 month and signed", "Parking bay suspension approval, issued within the last 1 month and signed", "Signed move plan, signed"], "submission": {"case": {"name": "office move project SN-2980", "reference": "YD-55373", "details": ["The move takes place over a weekend."]}, "documents received": ["Crate hire agreement for office move project SN-2980, dated 6 August 2026. 2 pages, complete. Signed by the crate hire supplier.", "Lifting equipment inspection report for office move project SN-2980, dated 28 July 2026. 2 pages, complete. Signed by the lifting equipment inspector.", "New floor snagging list for office move project SN-2980, dated 29 August 2026. 3 pages, complete. Signed by the site manager.", "Movers insurance certificate for office move project SN-2980, showing an expiry date of 16 April 2027. Single page.", "Signed move plan for office move project SN-2980, dated 6 June 2026. 6 pages, complete. Signed by the project manager.", "Furniture inventory list for office move project SN-2980, dated 5 September 2026. 4 pages, complete. Signed by the facilities coordinator.", "Parking bay suspension approval for office move project SN-2980, dated 6 September 2026. Single page. Signed by the local authority parking officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 819}} {"id": "isc-te-00397-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Ovarheim plc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "6 August 2026"}, "checklist": ["Energy performance certificate, valid (not expired) on the date of the review.", "Title information document.", "If the tenant is a newly formed company, also: signed parent company guarantee (signed).", "Keys handover receipt (signed).", "Asbestos survey report (issued within the last 12 months).", "Signed draft lease (signed).", "If the lease term is longer than seven years, also: land registration application (signed)."], "submission": {"case": {"name": "premises SZ-39951", "reference": "XS-67082", "details": ["Thetestant is an established company.", "The lease term is seven years or less."]}, "documents received": ["Keys handover receipt for premises SZ-39951. It shows a date of issue of 5 July 2026 and is signed by the landlord's agent. Single page.", "Signed draft lease for premises SZ-39951. It shows a date of issue of 30 May 2026 and is signed by the landlord and the tenant. 12 pages, complete.", "Energy performance certificate for premises SZ-39951. It shows an expiry date of 16 August 2026. Single page.", "Asbestos survey report for premises SZ-39951. It shows a date of issue of 27 December 2025. 4 pages, complete.", "Title information document for premises SZ-39951. It shows a date of issue of 8 July 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 7, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 765}} {"id": "isc-te-00126-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Ulmwood Limited", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "7 May 2026"}, "checklist": ["Title information document.", "Asbestos survey report, issued within the last 12 months.", "Signed keys handover receipt.", "Company search report, issued within the last 1 months.", "Signed draft lease.", "Signed stamp duty return."], "submission": {"case": {"name": "premises KE-13480", "reference": "VJ-73666"}, "documents received": ["Unapproved heads of terms for premises KE-13480, dated 2 February 2026. 12 pages, complete, signed by the landlord and the proposed tenant.", "Keys handover receipt for premises KE-13480, dated 25 February 2026. Single page, signed by the landlord's representative.", "Company search report for premises KE-13480, dated 18 April 2026. 2 pages, complete.", "Asbestos survey report for premises KE-13480, dated 20 September 2025. 4 pages, complete.", "Stamp duty return for premises KE-13480, dated 7 January 2026. 2 pages, complete, signed by the tenant's solicitor.", "Title information document for premises KE-13480, dated 29 January 2026. 3 pages, complete.", "Signed draft lease for premises KE-13480, dated 2 February 2026. 12 pages, complete, signed by the landlord and the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 753}} {"id": "isc-te-00344-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Xanmore GmbH", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 March 2026"}, "checklist": ["Confirm the intellectual property register extract is included, issued within the last 6 months and signed.", "Confirm the external advisory board minutes are included, issued within the last 12 months and signed.", "Confirm the annual activity report is included, issued within the last 6 months and signed.", "Confirm the staffing plan is included, issued within the last 6 months and signed.", "If the institute received industry funding above the university's disclosure threshold, also confirm the industry funding disclosure statement is included, issued within the last 12 months and signed."], "submission": {"case": {"name": "Veyhurst Ltd", "reference": "UY-40041", "details": ["The institute received no industry funding above the university's disclosure threshold."]}, "documents received": ["Annual activity report for Veyhurst Ltd. Date of issue: 19 January 2026. 12 pages, complete. Signed by the institute director.", "Doctoral researcher progress summary for Veyhurst Ltd. Date of issue: 19 February 2026. 2 pages, complete. Signed by the institute's doctoral programme coordinator.", "External advisory board minutes for Veyhurst Ltd. Date of issue: 15 February 2026. 4 pages, complete. Signed by the chair of the external advisory board.", "Staffing plan for Veyhurst Ltd. Date of issue: 12 September 2025. 2 pages, complete. Signed by the institute director.", "Intellectual property register extract for Veyhurst Ltd. Date of issue: 18 December 2025. 1 page. Signed by the institute's technology transfer officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 779}} {"id": "isc-te-00291-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Aldwick Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "14 July 2026"}, "checklist": ["Check for the thermostat calibration certificate, issued within the last 12 months.", "Check for the plant room access sign-in sheet.", "Check for the refrigerant top-up log, issued within the last 1 months and signed.", "Check for the asset condition photograph sheet, issued within the last 1 months.", "Check for the engineer's service report, issued within the last 1 months and signed.", "If the system contains more than 5 tonnes of refrigerant, also check for the fixed leak detection test certificate, issued within the last 6 months and signed."], "submission": {"case": {"name": "air conditioning system SL-89503", "reference": "NG-66391", "details": ["The system contains more than 5 tonnes of refrigerant."]}, "cover note": "Everything needed is attached and complete.", "documents received": ["Fixed leak detection test certificate SL-89503.pdf: A fixed leak detection test certificate for air conditioning system SL-89503, dated 16 February 2026; 2 pages, complete, signed by the leak detection engineer.", "Asset condition photograph sheet SL-89503.pdf: An asset condition photograph sheet for air conditioning system SL-89503, dated 30 June 2026; 2 pages, complete.", "Plant room access sign-in sheet SL-89503.pdf: A single-page plant room access sign-in sheet for air conditioning system SL-89503, dated 25 June 2026.", "Engineer F-gas handling certificate SL-89503.pdf: A single-page engineer F-gas handling certificate for air conditioning system SL-89503, showing an expiry date of 20 February 2027.", "Old refrigerant log 2025 SL-89503.pdf: A single-page old refrigerant log from a previous year for air conditioning system SL-89503, dated 25 June 2026, signed by the site technician.", "Engineer's service report SL-89503.pdf: An engineer's service report for air conditioning system SL-89503, dated 25 June 2026; 3 pages, complete, signed by the service engineer.", "Thermostat calibration certificate SL-89503.pdf: A single-page thermostat calibration certificate for air conditioning system SL-89503, dated 4 November 2025."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 983}} {"id": "isc-te-00002-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Hondford Limited", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "21 May 2026"}, "checklist": ["Firewall change request form, signed.", "Current rule set export, issued within the last 1 month.", "Post-change test plan, signed.", "Peer review checklist, issued within the last 1 month and signed.", "Proposed rule change specification, signed.", "Business justification memo, issued within the last 3 months and signed."], "submission": {"case": {"name": "firewall change DG-58616", "reference": "DU-21666"}, "cover note": "A colleague has already checked this pack before it comes to you. Please carry out your review as normal.", "documents received": ["Business justification memo for change DG-58616. Date of issue: 6 February 2026. Single page. Signed by the requesting business manager.", "Peer review checklist for change DG-58616. Date of issue: 14 May 2026. Single page. Signed by the reviewing peer engineer.", "Proposed rule change specification for change DG-58616. Date of issue: 12 February 2026. 2 pages, complete. Signed by the senior firewall engineer.", "Post-change test plan for change DG-58616. Date of issue: 27 April 2026. 2 pages, complete. Signed by the test lead.", "Firewall change request form for change DG-58616. Date of issue: 12 April 2026. 3 pages, complete. Signed by the requesting network engineer.", "Current rule set export for change DG-58616. Date of issue: 12 May 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00180-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Weskfield SAS", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "24 July 2026"}, "checklist": ["Confirm the pack includes the rollback plan, signed.", "Confirm the pack includes the firewall change request form, signed.", "Confirm the pack includes the current rule set export, issued within the last 1 months.", "Confirm the pack includes the peer review checklist, issued within the last 1 months, signed."], "submission": {"case": {"name": "firewall change GH-61214", "reference": "TJ-47386"}, "documents received": ["current_rule_set_export_GH-61214.pdf — Current rule set export for firewall change GH-61214, dated 11 July 2026. 8 pages, complete.", "rollback_plan_GH-61214.pdf — Rollback plan for firewall change GH-61214, dated 22 May 2026. 2 pages, complete. Signed by the network security team lead.", "peer_review_checklist_GH-61214.pdf — Peer review checklist for firewall change GH-61214, dated 13 July 2026. Single page. Signed by the peer reviewer.", "firewall_change_request_GH-61214.pdf — Firewall change request form for firewall change GH-61214, dated 13 July 2026. 3 pages, complete. Signed by the requesting change manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 721}} {"id": "isc-te-00402-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Wilmdale Limited", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "14 July 2026"}, "checklist": ["Trade account application form, signed.", "Bank reference letter, issued within the last 6 months, signed.", "Company registration certificate.", "If the customer is a newly incorporated company, also: director identification record, signed.", "Credit reference agency report, issued within the last 3 months.", "Credit limit approval memo, issued within the last 1 months, signed."], "submission": {"case": {"name": "Larvridge Partners", "reference": "JU-12708", "details": ["The customer is not a newly incorporated company."]}, "documents received": ["Credit reference agency report for Larvridge Partners, dated 4 May 2026. 6 pages, complete.", "Credit limit approval memo for Larvridge Partners, dated 2 July 2026. Single page. Signed by the credit control manager.", "Trade account application form for Larvridge Partners, dated 5 April 2026. 3 pages, complete. Signed by the customer's authorised signatory.", "Trade references letter for Larvridge Partners, dated 6 May 2026. Single page. Signed by the referee company's authorised signatory.", "Company registration certificate for Larvridge Partners, dated 27 June 2026. 2 pages, complete.", "Bank reference letter for Larvridge Partners, dated 9 May 2026. Single page. Signed by a bank officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 723}} {"id": "isc-te-00225-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Haskmark Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "29 July 2026"}, "checklist": ["Certified quality management system certificate, valid (not expired) on the date of the review.", "Supplier corrective action plan, issued within the last 6 months and signed.", "Supplier audit report, issued within the last 24 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed.", "Raw material certificate of analysis, issued within the last 6 months and signed."], "submission": {"case": {"name": "Jaskfield LLP", "reference": "PX-41794"}, "cover note": "Please find attached the pack for reference PX-41794, which a colleague has already checked. Let me know if you need anything further. Priya Drumley", "documents received": ["Certified quality management system certificate for Jaskfield LLP, showing an expiry date of 29 November 2028. Single page.", "Raw material certificate of analysis for Jaskfield LLP, dated 26 March 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Supplier audit report for Jaskfield LLP, dated 28 July 2025. 8 pages, complete. Signed by the lead auditor.", "Supplier quality questionnaire for Jaskfield LLP, dated 16 July 2026. 4 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 712}} {"id": "isc-te-00008-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Glenstead Ltd", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "3 August 2026"}, "checklist": ["Signed bank charges and interest explanation sheet.", "If the account is a foreign currency account, also: signed exchange rate conversion schedule.", "Outstanding receipts list.", "Signed reviewer sign-off sheet for the reconciliation.", "Signed bank reconciliation statement.", "If the reconciliation shows an unexplained difference that is not an outstanding item, also: signed unexplained difference investigation note.", "Direct debit mandate report from the bank, issued within the last 3 months."], "submission": {"case": {"name": "company bank account ZZ-59368", "reference": "LP-94539", "details": ["The account is a foreign currency account.", "The reconciliation shows an unexplained difference that is not an outstanding item."]}, "documents received": ["exchange_rate_conversion_schedule_ZZ-59368.pdf - Exchange rate conversion schedule for company bank account ZZ-59368, dated 17 April 2026. It is a single page, signed by the financial controller.", "reviewer_sign-off_sheet_ZZ-59368.pdf - Reviewer sign-off sheet for the reconciliation for company bank account ZZ-59368, dated 9 June 2026. It is a single page, signed by the financial controller.", "outstanding_payments_list_ZZ-59368.pdf - Outstanding payments list for company bank account ZZ-59368, dated 25 July 2026. It is a single page.", "bank_charges_and_interest_explanation_sheet_ZZ-59368.pdf - Bank charges and interest explanation sheet for company bank account ZZ-59368, dated 13 June 2026. It is a single page, signed by the financial controller.", "unexplained_difference_investigation_note_ZZ-59368.pdf - Unexplained difference investigation note for company bank account ZZ-59368, dated 30 April 2026. It is 2 pages, complete, and signed by the financial controller.", "bank_reconciliation_statement_ZZ-59368.pdf - Bank reconciliation statement for company bank account ZZ-59368, dated 17 April 2026. It is 2 pages, complete, and signed by the financial controller.", "direct_debit_mandate_report_ZZ-59368.pdf - Direct debit mandate report from the bank for company bank account ZZ-59368, dated 1 July 2026. It is 2 pages, complete.", "outstanding_receipts_list_ZZ-59368.pdf - Outstanding receipts list for company bank account ZZ-59368, dated 6 July 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; base your judgement on the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-42", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1016}} {"id": "isc-te-00000-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Jorbury Partners", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "17 April 2026"}, "checklist": ["Obtain the signed non-disclosure reminder acknowledgement.", "Obtain the final payroll cut-off note, issued within the last 1 months and signed.", "If the leaver held privileged administrator accounts, also obtain the privileged account revocation certificate, issued within the last 1 months and signed.", "Obtain the service desk ticket closure summary, issued within the last 1 months.", "Obtain the line manager confirmation, issued within the last 1 months and signed."], "submission": {"case": {"name": "Matthias Grubisey", "reference": "TW-20429", "details": ["The leaver held privileged administrator accounts."]}, "documents received": ["privileged_account_revocation_cert_grubisey_13apr2026.pdf — A single-page privileged account revocation certificate for Matthias Grubisey, dated 13 April 2026. It is signed by the identity and access management team lead.", "access_rights_inventory_grubisey_30mar2026.pdf — An access rights inventory for Matthias Grubisey, dated 30 March 2026. 4 pages, complete.", "service_desk_ticket_closure_summary_grubisey_11apr2026.pdf — A service desk ticket closure summary for Matthias Grubisey, dated 11 April 2026. 3 pages, complete.", "final_payroll_cutoff_note_grubisey_2apr2026.pdf — A single-page final payroll cut-off note for Matthias Grubisey, dated 2 April 2026. It is signed by the payroll officer.", "ndc_reminder_ack_grubisey_28dec2025.pdf — A single-page non-disclosure reminder acknowledgement for Matthias Grubisey, dated 28 December 2025. It is signed by Matthias Grubisey."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00204-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Faldfeld LLP", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "8 May 2026"}, "checklist": ["Refrigerant top-up log, issued within the last 1 month and signed", "Plant room access sign-in sheet", "System pressure test results, issued within the last 1 month and signed", "F-gas leak check record, issued within the last 12 months and signed", "If refrigerant was added during the service, also: refrigerant recovery note, issued within the last 1 month and signed", "Engineer F-gas handling certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "air conditioning system FW-33470", "reference": "JE-34942", "details": ["No refrigerant was added during the service."]}, "documents received": ["Plant room access sign-in sheet for air conditioning system FW-33470, issued 4 April 2026, 1 page.", "Engineer F-gas handling certificate for air conditioning system FW-33470, showing an expiry date of 12 January 2028, 1 page.", "File scan-0007.pdf: the scan is blank, so its contents cannot be seen.", "System pressure test results for air conditioning system FW-33470, issued 19 April 2026, 2 pages, complete. It is signed by the servicing engineer.", "Thermostat calibration certificate for air conditioning system FW-33470, issued 16 November 2025, 1 page.", "F-gas leak check record for air conditioning system FW-33470, issued 9 December 2025, 2 pages, complete. It is signed by the leak check engineer.", "Refrigerant top-up log for air conditioning system FW-33470, issued 19 April 2026, 1 page. It is signed by the servicing engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 837}} {"id": "isc-te-00237-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Baxside Limited", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "16 March 2026"}, "checklist": ["Bank interest statement issued within the last 13 months", "Pension contribution certificate issued within the last 13 months", "Capital gains asset record", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Tax return draft printout, signed", "Childcare payment receipt issued within the last 13 months"], "submission": {"case": {"name": "household tax affairs MV-6666", "reference": "AI-52954", "details": ["The household sold no property other than its main home during the tax year."]}, "documents received": ["bank-interest-statement-MV-6666.pdf - Bank interest statement for household tax affairs MV-6666. Date of issue: 25 January 2026. 3 pages, complete.", "capital-gains-asset-record-MV-6666.pdf - Capital gains asset record for household tax affairs MV-6666. Date of issue: 28 December 2025. 2 pages, complete.", "pension-contribution-certificate-MV-6666.pdf - Pension contribution certificate for household tax affairs MV-6666. Date of issue: 26 January 2026. 2 pages, complete.", "tax-return-draft-printout-MV-6666.pdf - Tax return draft printout for household tax affairs MV-6666. Date of issue: 8 December 2025. 6 pages, complete. Signed by the filer.", "childcare-payment-receipt-MV-6666-undated.pdf - Childcare payment receipt for household tax affairs MV-6666. The date is smudged and cannot be read. Single page.", "rental-income-record-MV-6666.pdf - Rental income record for household tax affairs MV-6666. Date of issue: 17 February 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 861}} {"id": "isc-te-00319-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Oskford BV", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "17 September 2026"}, "checklist": ["Supplier self-assessment report, issued within the last 12 months and signed.", "Certified quality management system certificate, valid (not expired) on the date of the review.", "Financial stability statement, issued within the last 12 months and signed.", "Raw material certificate of analysis, issued within the last 6 months and signed.", "If the supplier provides parts that are safety-critical, also: process failure mode and effects analysis, signed.", "Supplier audit report, issued within the last 24 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed."], "submission": {"case": {"name": "Elstfeld SAS", "reference": "QD-20096", "details": ["The supplier provides parts that are safety-critical."]}, "documents received": ["Raw material certificate of analysis for Elstfeld SAS. Date of issue: 6 July 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Financial stability statement for Elstfeld SAS. Date of issue: 6 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Certified quality management system certificate for Elstfeld SAS. Expiry date: 8 March 2028. Single page.", "Supplier quality questionnaire for Elstfeld SAS. Date of issue: 29 January 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Supplier self-assessment report for Elstfeld SAS. Date of issue: 14 May 2026. 6 pages, complete. Signed by the supplier's quality manager.", "Supplier audit report for Elstfeld SAS. Date of issue: 6 January 2025. 8 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 810}} {"id": "isc-te-00324-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Brenmont Partners", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "9 June 2026"}, "checklist": ["Shipping manifest, issued within the last 1 months", "Point of sale design proof, signed", "If the kit includes an electrical display unit, also: electrical safety test certificate, issued within the last 12 months", "Store installation guide", "Kit cost breakdown, issued within the last 3 months and signed", "Waste disposal plan"], "submission": {"case": {"name": "merchandising kit CY-19341", "reference": "ZV-32595", "details": ["The kit includes no electrical display unit."]}, "documents received": ["Point of sale design proof - CY-19341.pdf — A point of sale design proof for merchandising kit CY-19341, dated 4 May 2026. 4 pages, complete. It carries a signature from the design studio's lead designer.", "Kit cost breakdown - CY-19341.pdf — A kit cost breakdown for merchandising kit CY-19341, dated 5 June 2026. 2 pages, complete. It is signed by the retail marketing team's finance contact.", "Store installation guide - CY-19341.pdf — A store installation guide for merchandising kit CY-19341. It is dated 5 April 2026. 6 pages, complete.", "Waste disposal plan - CY-19341.pdf — A waste disposal plan for merchandising kit CY-19341, dated 11 May 2026. 1 page.", "Shipping manifest - CY-19341.pdf — A shipping manifest for merchandising kit CY-19341. It is dated 28 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00373-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Selvmont & Co", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "24 April 2026"}, "checklist": ["Signature verification record, signed", "Card replacement request form, signed", "Photo identification, valid (not expired) on the date of the review", "Confirmation of contact details, issued within the last 3 months", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "If the card was stolen rather than lost, also: police report reference document, issued within the last 1 months, signed"], "submission": {"case": {"name": "Matthias Sabopoulos", "reference": "SX-64326", "details": ["The cardholder is at their home address.", "The card was stolen rather than lost."]}, "cover note": "Please accept my apologies that this pack was put together in a rush. Thank you for your patience. Kavya Fitzeau", "documents received": ["Photo identification for Matthias Sabopoulos, showing an expiry date of 9 October 2028. Single page.", "Card replacement request form for Matthias Sabopoulos, dated 4 February 2026. 2 pages, complete. It is signed by the cardholder.", "Police report reference document for Matthias Sabopoulos, dated 14 April 2026. Single page. It is signed by the reporting officer.", "Signature verification record for Matthias Sabopoulos, dated 1 February 2026. Single page. It is signed by the branch officer who verified the signature.", "Confirmation of contact details for Matthias Sabopoulos, dated 7 April 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 749}} {"id": "isc-te-00400-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravby plc", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "12 March 2026"}, "checklist": ["Inbound unloading record, issued within the last 1 months and signed.", "Damaged goods exception sheet, issued within the last 1 months and signed.", "Load consolidation sheet, issued within the last 3 months and signed.", "Outbound loading record, issued within the last 1 months and signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet, issued within the last 1 months and signed.", "Transfer manifest, signed.", "Cross-dock slot booking sheet, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer CF-57678", "reference": "AQ-93363", "details": ["The transfer includes a temperature-controlled load."]}, "documents received": ["Cross-dock-chiller-unit-check-sheet-CF-57678.pdf. A cross-dock chiller unit check sheet for cross-dock transfer CF-57678, dated 6 March 2026. Single page, signed by the refrigeration technician.", "Damaged-goods-exception-sheet-CF-57678.pdf. A damaged goods exception sheet for cross-dock transfer CF-57678, dated 9 March 2026. Single page, signed by the shift supervisor.", "Outbound-loading-record-CF-57678.pdf. An outbound loading record for cross-dock transfer CF-57678, dated 4 March 2026. Single page, signed by the loading bay operator.", "Inbound-unloading-record-CF-57678.pdf. An inbound unloading record for cross-dock transfer CF-57678, dated 25 February 2026. Single page, signed by the inbound unloading operative.", "Cross-dock-slot-booking-sheet-CF-57678.pdf. A cross-dock slot booking sheet for cross-dock transfer CF-57678, dated 7 March 2026. Single page, signed by the cross-dock coordinator.", "Transfer-completion-confirmation-CF-57678.pdf. A transfer completion confirmation for cross-dock transfer CF-57678, dated 3 March 2026. Single page, signed by the cross-dock supervisor.", "Transfer-manifest-CF-57678.pdf. A transfer manifest for cross-dock transfer CF-57678, dated 21 November 2025. 3 pages, complete, signed by the transport planner.", "Load-consolidation-sheet-CF-57678.pdf. A load consolidation sheet for cross-dock transfer CF-57678, dated 19 January 2026. 2 pages, complete, signed by the load planner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1034}} {"id": "isc-te-00405-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lunside Group", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "14 May 2026"}, "checklist": ["Previous audit findings closure file, signed.", "Open corrective action list, issued within the last 1 months, signed.", "Audit agenda, signed.", "Calibration status summary, issued within the last 1 months, signed."], "submission": {"case": {"name": "customer audit visit PB-63424", "reference": "XM-57442"}, "documents received": ["document_control_list_PB-63424.pdf - Document control list for customer audit visit PB-63424. It shows a date of issue of 9 March 2026 and is signed by the quality management office manager. 4 pages, complete.", "open_corrective_action_list_PB-63424.pdf - Open corrective action list for customer audit visit PB-63424. It shows a date of issue of 5 May 2026 and is signed by the quality management office manager. 2 pages, complete.", "audit_agenda_PB-63424.pdf - Audit agenda for customer audit visit PB-63424. It shows a date of issue of 9 March 2026 and is signed by the quality management office manager. Single page.", "calibration_status_summary_PB-63424.pdf - Calibration status summary for customer audit visit PB-63424. It shows a date of issue of 1 May 2026 and is signed by the quality management office manager. 2 pages, complete.", "previous_audit_findings_closure_file_PB-63424.pdf - Previous audit findings closure file for customer audit visit PB-63424. It shows a date of issue of 3 February 2026 and is signed by the quality management office manager. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00307-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Baxwood Group", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "27 May 2026"}, "checklist": ["Confirm the keys handover receipt is present and signed.", "Confirm the signed draft lease is present and signed.", "Confirm the title information document is present.", "Confirm the energy performance certificate is present and valid (not expired) on 27 May 2026.", "If the tenant is a newly formed company, also confirm the signed parent company guarantee is present and signed.", "Confirm the asbestos survey report is present and was issued within the last 12 months.", "Confirm the stamp duty return is present and signed."], "submission": {"case": {"name": "premises BY-30837", "reference": "LN-29332", "details": ["The tenant is a newly formed company."]}, "documents received": ["parent-company-guarantee-BY-30837-signed.pdf — Signed parent company guarantee for premises BY-30837, dated 20 March 2026. 3 pages, complete. Signed by the parent company's authorised signatory.", "title-information-document-BY-30837.pdf — Title information document for premises BY-30837, issued 6 February 2026. 3 pages, complete.", "energy-performance-certificate-BY-30837-b.pdf — Energy performance certificate for premises BY-30837, expiring 14 June 2026. 1 page.", "energy-performance-certificate-BY-30837-c.pdf — Energy performance certificate for premises BY-30837, expiring 27 August 2024. 1 page.", "stamp-duty-return-BY-30837.pdf — Stamp duty return for premises BY-30837, issued 8 March 2026. 2 pages, complete. Signed by the tenant's accountant.", "keys-handover-receipt-BY-30837.pdf — Keys handover receipt for premises BY-30837, issued 3 April 2026. 1 page. Signed by the landlord's managing agent.", "asbestos-survey-report-BY-30837.pdf — Asbestos survey report for premises BY-30837, issued 26 April 2026. 4 pages, complete.", "draft-lease-BY-30837-signed.pdf — Signed draft lease for premises BY-30837, dated 29 April 2026. 12 pages, complete. Signed by the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 966}} {"id": "isc-te-00475-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Jaskside plc", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "5 March 2026"}, "checklist": ["If the employee has caring responsibilities for a dependent, also: caring responsibilities statement (signed).", "Trial period proposal (signed).", "Current working pattern statement (issued within the last 3 months).", "If the request is to work entirely from home, also: home working equipment checklist (signed).", "Line manager opinion note (issued within the last 2 months, signed).", "Impact assessment on the team (signed).", "Proposed working pattern plan (signed).", "Client or service impact statement (signed)."], "submission": {"case": {"name": "Beatriz Zellopoulos", "reference": "FK-25780", "details": ["The employee does not have caring responsibilities for a dependent.", "The request is not to work entirely from home."]}, "cover note": "Dear HR operations team, please find attached the flexible working request pack for Beatriz Zellopoulos, reference FK-25780. I am not sure everything needed is there, so please let me know if anything else is required.", "documents received": ["Trial period proposal for Beatriz Zellopoulos. Dated 10 December 2025. Single page, signed by Beatriz Zellopoulos.", "Line manager opinion note on Beatriz Zellopoulos. Dated 2 February 2026. 2 pages, complete, signed by the line manager.", "Current working pattern statement for Beatriz Zellopoulos. Dated 15 December 2025. Single page.", "Client or service impact statement for Beatriz Zellopoulos. Dated 15 December 2025. Single page, signed by the line manager.", "Impact assessment on the team regarding Beatriz Zellopoulos. Dated 7 February 2026. 3 pages, complete, signed by the line manager.", "Proposed working pattern plan for Beatriz Zellopoulos. Dated 12 November 2025. 2 pages, complete, signed by Beatriz Zellopoulos.", "Flexible working request form from Beatriz Zellopoulos. Dated 9 February 2026. 3 pages, complete, signed by Beatriz Zellopoulos."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 893}} {"id": "isc-te-00126-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Ulmwood Limited", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "7 May 2026"}, "checklist": ["Title information document.", "Asbestos survey report, issued within the last 12 months.", "Signed keys handover receipt.", "Company search report, issued within the last 1 months.", "Signed draft lease.", "Signed stamp duty return."], "submission": {"case": {"name": "premises KE-13480", "reference": "VJ-73666"}, "documents received": ["Asbestos survey report for premises KE-13480, dated 20 September 2025. 4 pages, complete.", "Title information document for premises KE-13480, dated 29 January 2026. 3 pages, complete.", "Stamp duty return for premises KE-13480, dated 7 January 2026. 2 pages, complete, signed by the tenant's solicitor.", "Unapproved heads of terms for premises KE-13480, dated 2 February 2026. 12 pages, complete, signed by the landlord and the proposed tenant.", "Company search report for premises KE-13480, dated 18 April 2026. 2 pages, complete.", "Keys handover receipt for premises KE-13480, dated 25 February 2026. Single page, signed by the landlord's representative.", "Guarantor consent letter for premises KE-13480, dated 16 February 2026. Single page, signed by the guarantor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00188-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Fennfell Group", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "3 August 2026"}, "checklist": ["Travel advance request form, signed", "Line manager approval for the advance, signed", "Costed trip estimate sheet issued within the last 3 months, signed", "Outstanding advance clearance check, signed", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Daniel Aldwick", "reference": "RL-87051"}, "documents received": ["Payroll Deduction Agreement for Recovery of the Advance. The agreement relates to Daniel Aldwick and is dated 19 June 2026. It is a single page and is signed by the travelling employee.", "Line Manager Approval for the Advance. The approval relates to Daniel Aldwick and is dated 4 May 2026. It is a single page and is signed by the line manager.", "Travel Advance Request Form. The form relates to Daniel Aldwick and is dated 30 May 2026. It is a single page and is signed by the travelling employee.", "Costed Trip Estimate Sheet. The sheet relates to Daniel Aldwick and is dated 23 June 2026. It is a single page and is signed by the travelling employee.", "Outstanding Advance Clearance Check. The check relates to Daniel Aldwick and is dated 30 May 2026. It is a single page and is signed by the accounts payable reviewer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 707}} {"id": "isc-te-00330-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Marlmoor GmbH", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "17 April 2026"}, "checklist": ["Line manager approval, signed", "If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Visa entry requirement printout, issued within the last 3 months", "Flight itinerary quote, issued within the last 1 months", "Travel request form, signed", "If the trip involves travel to a country requiring a visa, also: visa approval letter", "Hotel booking confirmation"], "submission": {"case": {"name": "business trip LT-79663", "reference": "RA-34404", "details": ["The traveller holds a passport of the destination country.", "The trip involves travel to a country requiring a visa."]}, "documents received": ["visa approval letter LT-79663. It is a visa approval letter for business trip LT-79663, dated 28 March 2026. 2 pages, complete.", "hotel booking confirmation LT-79663. It is a hotel booking confirmation for business trip LT-79663, dated 25 January 2026. 2 pages, complete.", "line manager approval LT-79663. It is a single-page line manager approval for business trip LT-79663, dated 10 March 2026, and it is signed by the traveller's line manager.", "visa entry requirement printout LT-79663. It is a visa entry requirement printout for business trip LT-79663, dated 8 February 2026. 2 pages, complete.", "travel request form LT-79663. It is a travel request form for business trip LT-79663, dated 21 March 2026. 2 pages, complete. It is signed by the traveller."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 625}} {"id": "isc-te-00279-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Yondbury LLP", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "9 March 2026"}, "checklist": ["Outstanding receipts list", "Bank reconciliation statement, signed", "Bank statement for the period, issued within the last 2 months", "If the reconciliation shows an unexplained difference that is not an outstanding item, also: unexplained difference investigation note, signed", "General ledger cash account listing", "Outstanding payments list"], "submission": {"case": {"name": "company bank account HK-23180", "reference": "KP-23420"}, "documents received": ["Bank charges and interest explanation sheet for company bank account HK-23180, dated 6 February 2026. 1 page. Signed by the financial controller.", "Outstanding payments list for company bank account HK-23180, dated 4 March 2026. 1 page.", "Bank statement for the period for company bank account HK-23180, dated 15 February 2026. 4 pages, complete.", "Reviewer sign-off sheet for the reconciliation for company bank account HK-23180, dated 24 December 2025. 1 page. Signed by the financial controller.", "Unexplained difference investigation note for company bank account HK-23180, dated 2 January 2026. 2 pages, complete. Signed by the preparer.", "General ledger cash account listing for company bank account HK-23180, dated 28 February 2026. 3 pages, complete.", "Bank reconciliation statement for company bank account HK-23180, dated 22 January 2026. 2 pages, complete. Signed by the financial controller.", "Outstanding receipts list for company bank account HK-23180, dated 12 November 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 824}} {"id": "isc-te-00202-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Hondstow BV", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "7 July 2026"}, "checklist": ["New floor snagging list, issued within the last 1 month and signed", "Lifting equipment inspection report, issued within the last 6 months and signed", "Furniture inventory list, issued within the last 1 month and signed", "Crate hire agreement, signed"], "submission": {"case": {"name": "office move project NU-22840", "reference": "HJ-76078"}, "documents received": ["Crate hire agreement for office move project NU-22840, dated 15 May 2026. 2 pages, complete. Signed by the crate hire supplier's representative.", "Lifting equipment inspection report for office move project NU-22840, dated 21 May 2026. 2 pages, complete. Signed by the inspection engineer.", "Furniture inventory list for office move project NU-22840; the date of issue is obscured by a stamp. 4 pages, complete. Signed by the facilities coordinator.", "New floor snagging list for office move project NU-22840, dated 25 June 2026. 3 pages, complete. Signed by the site manager."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack fulfils the checklist. Work through every checklist line relevant to this case. For a required document to count, it must be the kind of document the checklist lists (a similar one will not do), be about the subject of the case, have all its pages, be signed in every place the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, but at least one cannot be settled from what is shown, for instance when a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may prove misleading; evaluate the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "date not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "variant-38", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 688}} {"id": "isc-te-00340-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Eskness Limited", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "25 March 2026"}, "checklist": ["Training needs assessment (signed)", "Vendor quotation (issued within the last 3 months)", "Equipment purchase request form (signed)", "Three quotes comparison sheet (issued within the last 3 months, signed)", "Cost-benefit justification"], "submission": {"case": {"name": "equipment NP-85998", "reference": "KG-36968"}, "cover note": "My apologies for the rush in which this pack was assembled. I am happy to answer any questions.", "documents received": ["Three quotes comparison sheet - NP-85998.pdf - Three quotes comparison sheet for equipment NP-85998, dated 11 March 2026. 1 page. Signed by the procurement lead.", "Vendor quotation - NP-85998.pdf - Vendor quotation for equipment NP-85998, dated 8 February 2026. 2 pages, complete.", "Equipment purchase request form - NP-85998.pdf - Equipment purchase request form for equipment NP-85998, dated 19 March 2026. 2 pages, complete. Signed by the requesting department manager.", "Cost-benefit justification - NP-85998.pdf - Cost-benefit justification for equipment NP-85998, dated 13 March 2026. 3 pages, complete.", "Training needs assessment - NP-85998.pdf - Training needs assessment for equipment NP-85998, dated 7 December 2025. 1 page. Signed by the department head."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 762}} {"id": "isc-te-00248-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Aldston BV", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "27 July 2026"}, "checklist": ["benefit entitlement letters issued within the last 12 months", "support plan, signed", "safeguarding referral form issued within the last 12 months, signed", "If the adult lacks capacity to make the decision about their care arrangements, also: best interests decision record, signed", "capacity assessment record, signed", "recent bank statements issued within the last 3 months", "proof of identity valid (not expired) on the date of the review"], "submission": {"case": {"name": "Elena Lundton", "reference": "VW-56695", "details": ["The adult lacks capacity to make the decision about their care arrangements."]}, "documents received": ["Proof of identity. The document concerns Elena Lundton and shows its expiry date as 10 November 2027. It is a single page.", "Safeguarding referral form. The document concerns Elena Lundton and shows its date of issue as 23 December 2025. 2 pages, complete. It is signed by the safeguarding lead officer.", "Benefit entitlement letters. The document concerns Elena Lundton and shows its date of issue as 19 July 2026. 2 pages, complete.", "Best interests decision record. The document concerns Elena Lundton and shows its date of issue as 5 July 2026. 4 pages, complete. It is signed by the best interests assessor.", "Support plan. The document concerns Elena Lundton and shows its date of issue as 20 April 2026. 6 pages, complete. It is signed by the care coordinator.", "Recent bank statements. The document concerns Elena Lundton and shows its date of issue as 21 June 2026. 8 pages, complete.", "Capacity assessment record. The document concerns Elena Lundton and shows its date of issue as 9 April 2026. 4 pages, complete. It is signed by the capacity assessor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 845}} {"id": "isc-te-00235-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Tarvcliff plc", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "1 June 2026"}, "checklist": ["Check for proof of deposit savings, issued within the last 3 months.", "Check for mortgage application form, issued within the last 3 months and signed.", "Check for property valuation report, issued within the last 3 months and signed.", "Check for gifted deposit letter, issued within the last 3 months and signed.", "If the property being bought is a flat in a shared building, also check for management company pack, issued within the last 3 months."], "submission": {"case": {"name": "Pablo Drumsall", "reference": "TQ-86071", "details": ["The property being bought is a flat in a shared building."]}, "cover note": "I am not sure everything needed is there. Please let me know if anything else is required.", "documents received": ["Mortgage application form. Application in the name of Pablo Drumsall. Date of issue: 3 April 2026. 10 pages, complete. Signed by the borrower.", "Proof of deposit savings. Statement in the name of Pablo Drumsall. Date of issue: 25 March 2026. 2 pages, complete.", "Gifted deposit letter. Letter regarding Pablo Drumsall. Date of issue: 17 May 2026. 1 page. Signed by the giftor.", "Property valuation report. Report prepared for Pablo Drumsall. Date of issue: 13 April 2026. 8 pages, complete. Signed by the valuer.", "Management company pack. Pack for the property being bought by Pablo Drumsall. Date of issue: 22 March 20217. 12 pages, complete.", "Three months of bank statements. Statements for Pablo Drumsall. Date of issue: 3 May 2026. 9 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 812}} {"id": "isc-te-00482-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Delvcrest plc", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "24 April 2026"}, "checklist": ["Check the pack contains the purchase invoice for the machine.", "Check the pack contains the machine maintenance log, issued within the last 6 months.", "If the breakdown spoiled perishable stock, also: spoiled stock disposal certificate, issued within the last 3 months, signed.", "Check the pack contains the repair or replacement quotation, issued within the last 3 months.", "Check the pack contains the policy machinery schedule.", "If a temporary machine was hired to keep production going, also: temporary hire agreement for replacement machinery, issued within the last 3 months, signed."], "submission": {"case": {"name": "failed machine TK-72580", "reference": "JA-96370", "details": ["The breakdown spoiled no perishable stock.", "No temporary machine was hired to keep production going."]}, "cover note": "This pack has already been checked by a colleague, so it should be ready to go.", "documents received": ["Purchase invoice for the machine failed machine TK-72580. Dated 9 February 2026. 1 page.", "Repair or replacement quotation for failed machine TK-72580. Dated 22 February 2026. 2 pages, complete.", "Machine maintenance log for failed machine TK-72580. The date of issue is covered by a stamp and cannot be read. 5 pages, complete.", "Engineer's fault diagnosis report for failed machine TK-72580. Dated 16 April 2026. 4 pages, complete. Signed by the inspecting engineer.", "Policy machinery schedule for failed machine TK-72580. Dated 29 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 793}} {"id": "isc-te-00112-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lunhall Ltd", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "2 July 2026"}, "checklist": ["If the move includes taking furniture to a storage unit, also: storage unit access authorisation (signed)", "lifting equipment inspection report (issued within the last 6 months, signed)", "IT decommissioning certificate (issued within the last 1 months, signed)", "new floor snagging list (issued within the last 1 months, signed)", "movers insurance certificate (valid (not expired) on the date of the review)", "signed move plan (signed)", "crate hire agreement (signed)"], "submission": {"case": {"name": "office move project VB-98815", "reference": "KT-58591", "details": ["The move includes taking furniture to a storage unit."]}, "documents received": ["KT-58591 Furniture inventory list VB-98815.pdf. This is a furniture inventory list for office move project VB-98815, dated 19 June 2026. 4 pages, complete. It has been signed by the facilities coordinator.", "KT-58591 Movers insurance certificate VB-98815.pdf. This is a one-page movers insurance certificate for office move project VB-98815. It shows an expiry date of 20 May 2027.", "KT-58591 Crate hire agreement VB-98815.pdf. This is a crate hire agreement for office move project VB-98815, dated 9 June 2026. 2 pages, complete. It has been signed by the supplier's representative.", "KT-58591 Lifting equipment inspection report VB-98815.pdf. This is a lifting equipment inspection report for office move project VB-98815, dated 16 February 2026. 2 pages, complete. It has been signed by the lifting equipment inspector.", "KT-58591 IT decommissioning certificate VB-98815.pdf. This is a one-page IT decommissioning certificate for office move project VB-98815, dated 16 June 2026. It has been signed by the IT manager.", "KT-58591 Signed move plan VB-98815.pdf. This is a signed move plan for office move project VB-98815, dated 11 June 2026. 6 pages, complete. It has been signed by the project manager.", "KT-58591 Storage unit access authorisation VB-98815.pdf. This is a one-page storage unit access authorisation for office move project VB-98815, dated 4 June 2026. It has been signed by the facilities manager.", "KT-58591 New floor snagging list VB-98815.pdf. This is a new floor snagging list for office move project VB-98815, dated 22 May 2026. 3 pages, complete. It has been signed by the site manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1087}} {"id": "isc-te-00190-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ovarcourt GmbH", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "20 March 2026"}, "checklist": ["Mortgage application form, signed", "Sale and purchase agreement, signed", "Proof of deposit issued within the last 3 months", "Photo identity document valid (not expired) on the date of the review", "Credit bureau report issued within the last 1 months", "Employment certificate issued within the last 1 months, signed"], "submission": {"case": {"name": "property YQ-74246", "reference": "EC-84723"}, "documents received": ["mortgage-application-form-YQ-74246.pdf — Mortgage application form for property YQ-74246. It shows a date of issue of 7 December 2025. It is 6 pages, complete, and is signed by the applicant.", "proof-of-deposit-YQ-74246.pdf — Proof of deposit for property YQ-74246. It shows a date of issue of 8 January 2026. It is 1 page.", "credit-bureau-report-YQ-74246.pdf — Credit bureau report for property YQ-74246. It shows a date of issue of 10 March 2026. It is 4 pages, complete.", "sale-and-purchase-agreement-YQ-74246.pdf — Sale and purchase agreement for property YQ-74246. It shows a date of issue of 6 March 2026. It is 9 pages, complete, and is signed by the buyer and the seller.", "employment-certificate-YQ-74246.pdf — Employment certificate for property YQ-74246. It shows a date of issue of 14 March 2026. It is 1 page and is signed by the employer.", "bank-statement-YQ-74246.pdf — Bank statement for property YQ-74246. It shows a date of issue of 3 February 2026. It is 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 861}} {"id": "isc-te-00388-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Wilmford Inc", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "3 September 2026"}, "checklist": ["Meeting invitation with rights explained — issued within the last 1 month", "Written grievance statement — signed", "Evidence bundle index — signed", "Adjustment request record — issued within the last 3 months and signed"], "submission": {"case": {"name": "Sophie Orvaker", "reference": "RG-91668"}, "documents received": ["RG-91668_evidence_bundle_index.pdf — Evidence bundle index concerning Sophie Orvaker, dated 25 June 2026. 2 pages, complete. Signed by the employee relations team lead.", "RG-91668_written_grievance_statement_unsigned.pdf — Written grievance statement concerning Sophie Orvaker, dated 29 August 2026. 3 pages, complete. The signature line is empty; the document is not signed.", "RG-91668_meeting_invitation_rights_explained.pdf — Meeting invitation with rights explained concerning Sophie Orvaker, dated 23 August 2026. 1 page.", "RG-91668_adjustment_request_record.pdf — Adjustment request record concerning Sophie Orvaker, dated 26 July 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 498}} {"id": "isc-te-00222-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Pellmoor plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "2 March 2026"}, "checklist": ["Bank reference letter, issued within the last 6 months, signed", "Company registration certificate", "Signed credit terms agreement, signed", "Credit limit approval memo, issued within the last 1 months, signed", "Trade references letter, issued within the last 3 months, signed", "Only if the customer requests a credit limit above the standard cap, also: finance director sanction letter, issued within the last 1 months, signed"], "submission": {"case": {"name": "Ivrwick LLP", "reference": "RR-10016", "details": ["The customer requests a credit limit above the standard cap."]}, "documents received": ["Bank_reference_letter_Ivrwick_LLp_27Feb2026.pdf. Bank reference letter for Ivrwick LLP, dated 27 February 2026. 1 page, signed by the bank's relationship manager.", "Credit_limit_approval_memo_Ivrwick_LLp_18Feb2026.pdf. Credit limit approval memo for Ivrwick LLP, dated 18 February 2026. 1 page, signed by the credit control manager.", "Trade_references_letter_Ivrwick_LLp_11Dec2025.pdf. Trade references letter for Ivrwick LLP, dated 11 December 2025. 1 page, signed by the referee company's accounts manager.", "Credit_reference_agency_report_Ivrwick_LLp_23Dec2025.pdf. Credit reference agency report for Ivrwick LLP, dated 23 December 2025. 6 pages, complete.", "Signed_credit_terms_agreement_Ivrwick_LLp_17Nov2025.pdf. Signed credit terms agreement for Ivrwick LLP, dated 17 November 2025. 4 pages, complete, signed by a partner of Ivrwick LLP.", "Doc_RR-10016_item9.pdf. The contents of this file cannot be seen, as the scan is blank.", "Company_registration_certificate_Ivrwick_LLp_9Nov2025.pdf. Company registration certificate for Ivrwick LLP, dated 9 November 2025. 2 pages, complete.", "Finance_director_sanction_letter_Ivrwick_LLp_14Feb2026.pdf. Finance director sanction letter for Ivrwick LLP, dated 14 February 2026. 1 page, signed by the finance director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 941}} {"id": "isc-te-00064-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Rondgard Ltd", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "8 June 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Visa entry requirement printout (issued within the last 3 months)", "Travel request form (signed)", "Flight itinerary quote (issued within the last 1 months)", "Hotel booking confirmation"], "submission": {"case": {"name": "business trip WO-61646", "reference": "UY-28386"}, "documents received": ["Flight itinerary quote for business trip WO-61646. It shows a date of issue of 28 May 2026. 2 pages, complete.", "Hotel booking confirmation for business trip WO-61646. It shows a date of issue of 25 May 2026. 2 pages, complete.", "Passport copy for international travel for business trip WO-61646. It shows an expiry date of 27 June 2027. It is a single page.", "Visa entry requirement printout for business trip WO-61646. It shows a date of issue of 14 May 2026. 2 pages, complete.", "Travel request form for business trip WO-61646. It shows a date of issue of 17 February 2026. 2 pages, complete. It is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 715}} {"id": "isc-te-00445-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vaskburg Partners", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "27 August 2026"}, "checklist": ["If the claim exceeds the limit that requires director sign-off, also: director approval slip (issued within the last 3 months, signed)", "taxi fare receipt (issued within the last 6 months)", "restaurant receipt (issued within the last 6 months)", "train ticket receipt", "conference fee invoice (issued within the last 12 months)", "hotel invoice (issued within the last 6 months)"], "submission": {"case": {"name": "Claire Daskard", "reference": "YL-14076", "details": ["The claim exceeds the limit that requires director sign-off."]}, "cover note": "Please find everything needed for this claim attached and complete. Let me know if you would like anything further.", "documents received": ["Taxi fare receipt. It concerns Claire Daskard and shows its date of issue as 25 July 2026. It is 1 page.", "Conference fee invoice. It concerns Claire Daskard and shows its date of issue as 4 March 2026. It is 1 page.", "Train ticket receipt. It concerns Claire Daskard and shows its date of issue as 7 July 2026. It is 1 page.", "Hotel invoice. It concerns Claire Daskard and shows its date of issue as 31 March 2026. It is 2 pages, complete.", "Expense claim form. It concerns Claire Daskard and shows its date of issue as 30 April 2026. It is 2 pages, complete, and carries the signature of the claiming employee.", "Director approval slip. It concerns Claire Daskard and shows its date of issue as 1 July 2026. It is 1 page and carries the signature of the finance director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 796}} {"id": "isc-te-00266-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Wilmwyn Limited", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "30 April 2026"}, "checklist": ["Check that the pack contains a hotel invoice issued within the last 6 months.", "If the claim exceeds the limit that requires director sign-off, also check that the pack contains a director approval slip issued within the last 3 months and signed.", "Check that the pack contains a restaurant receipt issued within the last 6 months.", "Check that the pack contains a taxi fare receipt issued within the last 6 months.", "Check that the pack contains a currency conversion statement issued within the last 6 months."], "submission": {"case": {"name": "Xiu Knoxova", "reference": "HF-82888", "details": ["The claim is below the limit requiring director sign-off."]}, "documents received": ["Taxi fare receipt for Xiu Knoxova. Date of issue: 27 January 2026. 1 page.", "Hotel invoice for Xiu Knoxova. Date of issue: 14 November 2025. 2 pages, complete.", "Restaurant receipt for Xiu Knoxova. Date of issue: 29 December 2025. 1 page.", "Paper napkin with the total written on it for Xiu Knoxova. Date of issue: 29 December 2025. 1 page.", "Currency conversion statement for Xiu Knoxova. Date of issue: 22 March 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 711}} {"id": "isc-te-00017-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Yondgate Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "19 August 2026"}, "checklist": ["Check that the pack contains a prerequisite certificate.", "Check that the pack contains venue access instructions issued within the last 3 months.", "Check that the pack contains an employer sponsorship letter issued within the last 3 months and signed.", "Check that the pack contains payment confirmation issued within the last 3 months."], "submission": {"case": {"name": "course booking CC-42557", "reference": "LU-53975"}, "documents received": ["prerequisite_certificate_CC-42557.pdf. Prerequisite certificate for course booking CC-42557. It shows its date of issue as 9 August 2026 and is a single page.", "employer_sponsorship_letter_CC-42557_20260630.pdf. Employer sponsorship letter for course booking CC-42557. It shows its date of issue as 30 June 2026 and is a single page. It is signed by the employer's authorising signatory.", "venue_access_instructions_CC-42557_20260601.pdf. Venue access instructions for course booking CC-42557. It shows its date of issue as 1 June 2026 and is a single page.", "payment_confirmation_CC-42557_20260731.pdf. Payment confirmation for course booking CC-42557. It shows its date of issue as 31 July 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00090-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Uldvale LLP", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "27 April 2026"}, "checklist": ["Asset register update, issued within the last 1 months.", "Decommission request form, signed.", "Final backup confirmation, issued within the last 3 months, signed.", "Data migration confirmation, issued within the last 3 months, signed.", "Dependent systems check report, issued within the last 3 months.", "Licence reassignment note, issued within the last 3 months, signed.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server HC-85039", "reference": "XH-31889", "details": ["The server holds archived records that must be kept."]}, "documents received": ["Data migration confirmation for retired server HC-85039, dated 25 March 2026. 2 pages, complete. Signed by the systems migration lead.", "Final backup confirmation for retired server HC-85039, dated 26 March 2026. Single page. Signed by the backup administrator.", "Licence reassignment note for retired server HC-85039, dated 23 March 2026. Single page. Signed by the software licence administrator.", "Asset register update for retired server HC-85039, dated 15 April 2026. Single page.", "Dependent systems check report for retired server HC-85039, dated 21 March 2026. 3 pages, complete.", "Decommission request form for retired server HC-85039, dated 5 January 2026. 2 pages, complete. Signed by the infrastructure operations team lead.", "Archive retention confirmation for retired server HC-85039, dated 28 March 2026. 2 pages, complete. Signed by the records manager."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and say whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must concern the subject of the case, all its pages must be present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-0", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 854}} {"id": "isc-te-00152-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ilvstow GmbH", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "23 July 2026"}, "checklist": ["If the trip involves travel to a country requiring a visa, also: visa approval letter", "trip cost estimate (signed)", "If the traveller is not a passport holder of the destination country, also: work permit confirmation", "passport copy for international travel (valid (not expired) on the date of the review)", "hotel booking confirmation", "line manager approval (signed)"], "submission": {"case": {"name": "business trip JD-97425", "reference": "DE-41048", "details": ["The trip involves no country requiring a visa.", "The traveller is not a passport holder of the destination country."]}, "documents received": ["File: work permit confirmation JD-97425. A work permit confirmation for business trip JD-97425, dated 21 June 2026. 2 pages, complete.", "File: scan_097425_09. The file will not open, so its contents cannot be seen.", "File: line manager approval JD-97425. A line manager approval for business trip JD-97425, dated 16 May 2026. It is 1 page and is signed by the line manager.", "File: visa entry requirement printout JD-97425. A visa entry requirement printout for business trip JD-97425, dated 5 May 2026. 2 pages, complete.", "File: passport copy JD-97425.pdf. A passport copy for international travel for business trip JD-97425, showing an expiry date of 13 August 2026. It is 1 page.", "File: hotel booking confirmation JD-97425. A hotel booking confirmation for business trip JD-97425, dated 21 April 2026. 2 pages, complete.", "File: trip cost estimate JD-97425. A trip cost estimate for business trip JD-97425, dated 3 June 2026. It is 1 page and carries a signature from the line manager."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide if it is complete. Check every checklist line that is applicable to this case. A required document only counts if it is the kind of document that the checklist lists (not a similar kind), if it is about the subject of the case, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the review date, and if it was issued within the period the checklist allows. A conditional line applies only in cases where its circumstance holds. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves instead.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an unreadable extra file", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-56", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 903}} {"id": "isc-te-00323-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Bravbury plc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "20 March 2026"}, "checklist": ["Confirm the pack contains the brand colour specification", "Confirm the pack contains the waste disposal plan", "Confirm the pack contains the kit contents list", "Confirm the pack contains a signed point of sale design proof"], "submission": {"case": {"name": "merchandising kit TQ-71056", "reference": "ZM-22416"}, "documents received": ["A brand colour specification for merchandising kit TQ-71056, dated 27 December 2025. It is a single page.", "A waste disposal plan for merchandising kit TQ-71056, dated 4 December 2025. It is a single page.", "A kit contents list for merchandising kit TQ-71056, dated 14 December 2025. 2 pages, complete.", "A point of sale design proof for merchandising kit TQ-71056, dated 29 December 2025. 4 pages, complete. It has been signed by the brand manager.", "A store installation guide for merchandising kit TQ-71056, dated 15 February 2026. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every checklist line relevant to this case. A required document only counts if it is the kind of document listed (not a similar one), concerns the subject of the case, contains all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. Say complete: every applicable line is met (extra documents do not matter). Say incomplete: at least one applicable line is not met. Say unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-14", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 694}} {"id": "isc-te-00005-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ulmmoor LLP", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "6 May 2026"}, "checklist": ["Costed trip estimate sheet, issued within the last 3 months and signed", "Outstanding advance clearance check, signed", "Travel policy extract showing advance eligibility", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Marco Mundridge", "reference": "RH-30807"}, "documents received": ["Costed Trip Estimate Sheet. This single-page costed trip estimate sheet for Marco Mundridge is dated 23 March 2026 and carries the signature of the estimating clerk who prepared it.", "Travel Advance Request Form. This single-page travel advance request form for Marco Mundridge is dated 13 April 2026 and is signed by the requesting employee.", "Outstanding Advance Clearance Check. This single-page outstanding advance clearance check for Marco Mundridge is dated 13 April 2026 and is signed by the accounts payable reviewer.", "Payroll Deduction Agreement for Recovery of the Advance. This single-page payroll deduction agreement covering recovery of the advance for Marco Mundridge is dated 20 April 2026 and bears the employee's signature."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 465}} {"id": "isc-te-00127-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Selvgate Ltd", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "14 April 2026"}, "checklist": ["Funding agreement from a lender, issued within the last 3 months and signed", "Franchise disclosure document receipt, issued within the last 3 months and signed", "If the franchisee intends to operate through a company rather than as an individual, also: shareholder agreement extract, signed", "Operator licence, valid (not expired) on the date of the review", "Franchise application form, signed"], "submission": {"case": {"name": "Fennburg BV", "reference": "FA-82179", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "documents received": ["FA-82179_shareholder_agreement_extract_Fennburg_BV.pdf. A shareholder agreement extract concerning Fennburg BV, dated 11 March 2026, 4 pages, complete. It is signed by the company's shareholders.", "FA-82179_funding_agreement_Fennburg_BV.pdf. A funding agreement from a lender concerning Fennburg BV, dated 23 February 2026, 6 pages, complete. It is signed by the lender.", "FA-82179_pilot_operation_audit_report_Fennburg_BV.pdf. A pilot operation audit report concerning Fennburg BV, dated 24 February 2026, 8 pages, complete. It is signed by the auditor.", "FA-82179_franchise_disclosure_document_receipt_Fennburg_BV.pdf. A franchise disclosure document receipt concerning Fennburg BV, dated 12 February 2026, one page. It is signed by the franchisor's authorised officer.", "FA-82179_operator_licence_Fennburg_BV_2.pdf. An operator licence concerning Fennburg BV, showing an expiry date of 6 April 2025, 2 pages, complete.", "FA-82179_fit-out_cost_estimate_Fennburg_BV.pdf. A fit-out cost estimate concerning Fennburg BV, dated 20 February 2026, 4 pages, complete. It is signed by the franchisor's fit-out coordinator.", "FA-82179_franchise_application_form_Fennburg_BV.pdf. A franchise application form concerning Fennburg BV, dated 26 January 2026, 3 pages, complete. It is signed by the franchisee's director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "expired", "defect": "expired before the review", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 944}} {"id": "isc-te-00069-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Pellhurst BV", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "20 July 2026"}, "checklist": ["Benefit claim form, signed and valid (not expired) on the date of the review.", "Rent book or rent payment schedule, issued within the last 2 months.", "Proof of earnings, issued within the last 1 months.", "Current tenancy agreement, signed.", "Proof of savings, issued within the last 2 months.", "Proof of national insurance number.", "If the claimant is living in temporary accommodation arranged by the council, also: temporary accommodation placement letter."], "submission": {"case": {"name": "Giulia Paskock", "reference": "ZE-16894", "details": ["The claimant is living in temporary accommodation arranged by the council."]}, "documents received": ["Proof of national insurance number for Giulia Paskock. Date of issue: 6 June 2026. Single page.", "Proof of savings for Giulia Paskock. Date of issue: 8 July 2026. 2 pages, complete.", "Current tenancy agreement for Giulia Paskock. Date of issue: 11 June 2026. 12 pages, complete. Signed by the claimant and the landlord.", "Rent book or rent payment schedule for Giulia Paskock. Date of issue: 10 July 2026. 4 pages, complete.", "Recent bank statements for Giulia Paskock. Date of issue: 4 June 2026. 12 pages, complete.", "Proof of identity for Giulia Paskock. Expiry date: 23 September 2026. Single page.", "Proof of earnings for Giulia Paskock. Date of issue: 6 July 2026. 2 pages, complete.", "Benefit claim form for Giulia Paskock. Expiry date: 23 May 2028. 12 pages, complete. Signed by the claimant."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Go through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-49", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00177-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vaskness Limited", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "29 July 2026"}, "checklist": ["Flight availability printout, issued within the last 1 months", "Hotel availability printout, issued within the last 1 months, signed", "Passport details form, signed", "Special requests note, signed", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review", "Travel insurance quote, issued within the last 1 months"], "submission": {"case": {"name": "holiday booking BX-25277", "reference": "CW-76801", "details": ["The booking includes a child traveller."]}, "documents received": ["Flight availability printout for holiday booking BX-25277, dated 12 July 2026. 2 pages, complete.", "Travel insurance quote for holiday booking BX-25277, dated 14 July 2026. 2 pages, complete.", "Hotel availability printout for holiday booking BX-25277, dated 17 July 2026. 2 pages, complete. Signed by the reservations manager.", "Child passport copy for holiday booking BX-25277, showing an expiry date of 2 December 2028. 1 page.", "Travel insurance quote for holiday booking BX-25277, dated 28 September 2024. 2 pages, complete.", "Booking request form for holiday booking BX-25277, dated 12 April 2026. 2 pages, complete. Signed by the lead traveller.", "Special requests note for holiday booking BX-25277, dated 23 April 2026. 1 page. Signed by the lead traveller.", "Passport details form for holiday booking BX-25277, dated 9 May 2026. 1 page. Signed by the lead traveller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 831}} {"id": "isc-te-00099-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Bravholm Ltd", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "2 April 2026"}, "checklist": ["Confirm the pack contains a costed trip estimate sheet, issued within the last 3 months and signed.", "Confirm the pack contains an outstanding advance clearance check, signed.", "Confirm the pack contains a signed payroll deduction agreement for recovery of the advance.", "If the requested advance is above the standard advance limit, also confirm the pack contains a signed finance director approval for the higher advance.", "Confirm the pack contains a travel policy extract showing advance eligibility.", "Confirm the pack contains a signed line manager approval for the advance.", "Confirm the pack contains a trip itinerary and approval, issued within the last 3 months and signed."], "submission": {"case": {"name": "Sarah Rooksall", "reference": "KP-68602", "details": ["The requested advance is within the standard advance limit."]}, "documents received": ["KP-68602 line manager approval.pdf - Line manager approval for the advance for Sarah Rooksall, dated 9 December 2025, 1 page. Signed by the line manager.", "KP-68602 payroll deduction agreement.pdf - Payroll deduction agreement for recovery of the advance for Sarah Rooksall, dated 5 February 2026, 1 page. Signed by Sarah Rooksall.", "KP-68602 outstanding advance clearance check.pdf - Outstanding advance clearance check for Sarah Rooksall, dated 28 February 2026, 1 page. Signed by an accounts payable officer.", "KP-68602 costed trip estimate sheet.pdf - Costed trip estimate sheet for Sarah Rooksall, dated 6 February 2026, 1 page. Signed by the line manager.", "KP-68602 travel policy extract.pdf - Travel policy extract showing advance eligibility for Sarah Rooksall, dated 21 February 2026, 1 page.", "KP-68602 trip itinerary and approval.pdf - Trip itinerary and approval for Sarah Rooksall, dated 19 February 2026, 2 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 862}} {"id": "isc-te-00264-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vaskwyn SAS", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "3 July 2026"}, "checklist": ["If the mobile app release adds a new payment feature, also include: payment provider compliance checklist (issued within the last 3 months, signed)", "Release notes (issued within the last 1 months)", "Crash-free rate report (issued within the last 1 months)", "Marketing screenshot pack", "Age rating questionnaire (signed)", "Device compatibility matrix (issued within the last 3 months)"], "submission": {"case": {"name": "mobile app release GK-82707", "reference": "VU-56351", "details": ["The mobile app release adds a new payment feature."]}, "cover note": "Could you approve this pack quickly? All the paperwork is in order.", "documents received": ["release_notes_GK-82707.pdf — Release notes for mobile app release GK-82707. Date of issue: 1 July 2026. 2 pages, complete.", "device_compatibility_matrix_GK-82707.pdf — Device compatibility matrix for mobile app release GK-82707. Date of issue: 30 April 2026. 2 pages, complete.", "marketing_screenshots_GK-82707.pdf — Marketing screenshot pack for mobile app release GK-82707. Date of issue: 24 May 2026. 6 pages, complete.", "crash_free_rate_report_GK-82707.pdf — Crash-free rate report for mobile app release GK-82707. Date of issue: 24 June 2026. Single page.", "age_rating_questionnaire_GK-82707.pdf — Age rating questionnaire for mobile app release GK-82707. Date of issue: 24 March 2026. 2 pages, complete. Signed by the product owner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00249-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Wilmwood Inc", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "13 May 2026"}, "checklist": ["If the adult owns property that could be considered in the financial assessment, also: property valuation report (issued within the last 12 months, signed)", "needs assessment report (signed)", "recent bank statements (issued within the last 3 months)", "support plan (signed)", "proof of identity (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Rhys Lamnall", "reference": "CN-53168", "details": ["The adult owns property that could be considered in the financial assessment."]}, "documents received": ["capacity assessment record.pdf — A capacity assessment record about Rhys Lamnall, dated 13 April 2026. It has 4 pages, complete. It is signed by an approved mental health professional.", "proof of identity.pdf — A proof of identity about Rhys Lamnall, showing an expiry date of 20 April 2027. It is a single page.", "support plan.pdf — A support plan about Rhys Lamnall, dated 25 February 2026. It has 6 pages, complete. It is signed by a social worker.", "needs assessment report.pdf — A needs assessment report about Rhys Lamnall, dated 24 March 2026. It has 12 pages, complete. It is signed by a social worker.", "recent bank statements.pdf — Recent bank statements about Rhys Lamnall, dated 10 April 2026. It has 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00176-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Larvcliff Partners", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "9 March 2026"}, "checklist": ["Check that the pack contains a hotel invoice issued within the last 6 months.", "Check that the pack contains a train ticket receipt.", "Check that the pack contains a signed expense claim form.", "Check that the pack contains a conference fee invoice issued within the last 12 months.", "Check that the pack contains a restaurant receipt issued within the last 6 months."], "submission": {"case": {"name": "Lucy Wraxock", "reference": "HW-17248"}, "cover note": "Ava Farrnall: Everything needed is attached and complete, so the pack should be ready for your review.", "documents received": ["Train ticket receipt for Lucy Wraxock. Date of issue: 18 December 2025. Single page.", "Currency conversion statement for Lucy Wraxock. Date of issue: 5 November 2025. Single page.", "Conference fee invoice for Lucy Wraxock. Date of issue: 31 December 2025. Single page.", "Restaurant receipt for Lucy Wraxock. Date of issue: 10 October 2025. Single page.", "Expense claim form for Lucy Wraxock. Date of issue: 13 February 2026. 2 pages, complete. Signed by the claiming employee.", "Hotel key card sleeve for Lucy Wraxock. Date of issue: 9 November 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The decision to make is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves, not the notes.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-43", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 733}} {"id": "isc-te-00465-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Zalddale Group", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "13 July 2026"}, "checklist": ["Prerequisite certificate included", "If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "Employer sponsorship letter included (issued within the last 3 months, signed)", "Course booking form included (signed)", "Payment confirmation included (issued within the last 3 months)", "If the delegate requires an adjusted learning plan, also: learning support agreement (signed)"], "submission": {"case": {"name": "course booking BS-25601", "reference": "KW-27021", "details": ["The course leads to a licensed qualification.", "The delegate requires an adjusted learning plan."]}, "documents received": ["course_booking_form_BS-25601.pdf. A course booking form for course booking BS-25601, issued on 3 April 2026. 2 pages, complete, signed by the delegate.", "learning_support_agreement_BS-25601.pdf. A single-page learning support agreement for course booking BS-25601, issued on 19 March 2026, signed by the course tutor.", "employer_sponsorship_letter_BS-25601.pdf. A single-page employer sponsorship letter for course booking BS-25601, issued on 25 April 2026, signed by the employer's authorised signatory.", "payment_confirmation_BS-25601.pdf. A single-page payment confirmation for course booking BS-25601, issued on 3 May 2026.", "licence_eligibility_declaration_BS-25601.pdf. A single-page licence eligibility declaration for course booking BS-25601, issued on 21 June 2026, signed by the delegate."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 608}} {"id": "isc-te-00183-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Pentmere BV", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "23 June 2026"}, "checklist": ["Final backup confirmation, issued within the last 3 months, signed.", "Licence reassignment note, issued within the last 3 months, signed.", "Data migration confirmation, issued within the last 3 months, signed.", "Network disconnection confirmation, issued within the last 1 months, signed.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server CA-57344", "reference": "IG-40941", "details": ["The server holds archived records that must be kept."]}, "cover note": "Everything needed for the retired server CA-57344 pack is attached and complete. Please review it at your earliest convenience. Declan Vintell", "documents received": ["Final backup confirmation for retired server CA-57344, dated 15 April 2026, single page, signed by the backup administrator.", "Network disconnection confirmation for retired server CA-57344, dated 16 June 2026, single page; the signature line is empty, so it is not signed.", "Archive retention confirmation for retired server CA-57344, dated 17 April 2026, 2 pages, complete, signed by the records manager.", "Data wipe certificate for retired server CA-57344, dated 29 April 2026, single page, signed by the data wipe technician.", "Data migration confirmation for retired server CA-57344, dated 16 May 2026, 2 pages, complete, signed by the data migration lead.", "Licence reassignment note for retired server CA-57344, dated 23 May 2026, single page, signed by the licence manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00410-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Faldmark Ltd", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "27 August 2026"}, "checklist": ["Check that the IT equipment loan form is present and signed.", "Check that the placement learning plan is present and signed.", "Check that the internship agreement is present and signed.", "Check that the confidentiality undertaking is present and signed.", "If the internship is paid, also check that the payroll registration form is present and signed.", "Check that the right to work check record is present, signed, and issued within the last 6 months."], "submission": {"case": {"name": "Carmen Radton", "reference": "DN-88378", "details": ["The internship is paid."]}, "documents received": ["Confidentiality undertaking for Carmen Radton, dated 10 August 2026. 2 pages, complete. Signed by Carmen Radton.", "Right to work check record for Carmen Radton, dated 29 March 2026. Single page. Signed by the HR officer.", "Placement learning plan for Carmen Radton, dated 10 May 2026. 2 pages, complete. Signed by the marketing supervisor.", "Internship agreement for Carmen Radton, dated 8 June 2026. 4 pages, complete. Signed by the marketing manager.", "IT equipment loan form for Carmen Radton, dated 15 August 2026. Single page. Signed by the IT manager.", "Payroll registration form for Carmen Radton, dated 21 August 2026. 2 pages, complete. Signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 739}} {"id": "isc-te-00147-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Mersheim Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "10 April 2026"}, "checklist": ["If the borrower is self-employed, also include: two most recent tax year overviews, issued within the last 18 months, signed.", "If the property being bought is a flat in a shared building, also include: management company pack, issued within the last 3 months.", "Property valuation report, issued within the last 3 months, signed.", "Three months of bank statements, issued within the last 3 months.", "Three most recent payslips, issued within the last 3 months.", "Passport, valid (not expired) on the date of the review.", "Gifted deposit letter, issued within the last 3 months, signed."], "submission": {"case": {"name": "Charlotte Paskthwaite", "reference": "ZE-83977", "details": ["The borrower is self-employed.", "The property being bought is a flat in a shared building."]}, "cover note": "Callum Foskcombe here. This pack has already been checked over by a colleague before I sent it on to you.", "documents received": ["Management company pack for Charlotte Paskthwaite. Date of issue: 17 February 2026. 12 pages, complete.", "P60 tax summary for Charlotte Paskthwaite. Date of issue: 18 November 2025. 2 pages, complete.", "Three months of bank statements for Charlotte Paskthwaite. Date of issue: 13 February 2026. 9 pages, complete.", "Two most recent tax year overviews for Charlotte Paskthwaite. Date of issue: 17 July 2025. 4 pages, complete. Signed by HMRC, the issuing tax authority.", "Property valuation report for Charlotte Paskthwaite. Date of issue: 3 March 2026. 8 pages, complete. Signed by the surveyor who carried out the valuation.", "Three most recent payslips for Charlotte Paskthwaite. Date of issue: 13 March 2026. 3 pages, complete.", "Passport for Charlotte Paskthwaite. Expiry date: 13 April 2028. 2 pages, complete.", "Gifted deposit letter for Charlotte Paskthwaite. The date of issue is smudged and cannot be read. Single page. Signed by the person gifting the deposit."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 931}} {"id": "isc-te-00169-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Vornmere Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "10 June 2026"}, "checklist": ["Loyalty scheme enrolment form (signed)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Nominated store preference form (signed)", "Initial points balance statement (issued within the last 3 months)", "Terms and conditions acceptance sheet (signed)"], "submission": {"case": {"name": "Emily Kipaker", "reference": "LI-14145", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Marketing consent form for Emily Kipaker, dated 24 February 2026. A single page, signed by the member, Emily Kipaker.", "Loyalty scheme enrolment form for Emily Kipaker, dated 29 May 2026. A single page, signed by the member, Emily Kipaker.", "Terms and conditions acceptance sheet for Emily Kipaker, dated 1 March 2026. A single page, signed by the member, Emily Kipaker.", "Nominated store preference form for Emily Kipaker, dated 19 May 2026. A single page, signed by the member, Emily Kipaker.", "Initial points balance statement for Emily Kipaker, dated 6 April 2026. A single page."]}}, "question": {"type": "choice", "instructions": "Determine whether the pack is complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Mark the pack complete if every applicable line is met (extra documents do not matter). Mark the pack incomplete if at least one applicable line is not met. Mark the pack unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-28", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 722}} {"id": "isc-te-00447-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Delvheim SAS", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "10 August 2026"}, "checklist": ["Conference fee invoice, issued within the last 12 months", "Expense claim form, signed", "Currency conversion statement, issued within the last 6 months", "Taxi fare receipt, issued within the last 6 months", "Boarding pass stub", "Train ticket receipt"], "submission": {"case": {"name": "Thiago Sabock", "reference": "ML-97341"}, "documents received": ["Single-page currency conversion statement relating to Thiago Sabock, dated 13 May 2026.", "Single-page boarding pass stub relating to Thiago Sabock, dated 3 July 2026.", "Single-page conference fee invoice relating to Thiago Sabock, dated 28 May 2026.", "Expense claim form relating to Thiago Sabock, dated 31 May 2026. 2 pages, complete. Signed by the claiming employee, Thiago Sabock.", "Single-page train ticket receipt relating to Thiago Sabock, dated 28 April 2026.", "Single-page taxi fare receipt relating to Thiago Sabock, dated 28 February 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-65", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 656}} {"id": "isc-te-00008-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Glenstead Ltd", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "3 August 2026"}, "checklist": ["Signed bank charges and interest explanation sheet.", "If the account is a foreign currency account, also: signed exchange rate conversion schedule.", "Outstanding receipts list.", "Signed reviewer sign-off sheet for the reconciliation.", "Signed bank reconciliation statement.", "If the reconciliation shows an unexplained difference that is not an outstanding item, also: signed unexplained difference investigation note.", "Direct debit mandate report from the bank, issued within the last 3 months."], "submission": {"case": {"name": "company bank account ZZ-59368", "reference": "LP-94539", "details": ["The account is a foreign currency account.", "The reconciliation shows an unexplained difference that is not an outstanding item."]}, "cover note": "Hi, here is the pack for review. A colleague has already checked it. James Jessescu", "documents received": ["bank_reconciliation_statement_ZZ-59368.pdf - Bank reconciliation statement for company bank account ZZ-59368, dated 17 April 2026. It shows pages 1-1 of 2, and it is signed by the financial controller.", "reviewer_sign-off_sheet_ZZ-59368.pdf - Reviewer sign-off sheet for the reconciliation for company bank account ZZ-59368, dated 9 June 2026. It is a single page, signed by the financial controller.", "outstanding_receipts_list_ZZ-59368.pdf - Outstanding receipts list for company bank account ZZ-59368, dated 6 July 2026. It is a single page.", "exchange_rate_conversion_schedule_ZZ-59368.pdf - Exchange rate conversion schedule for company bank account ZZ-59368, dated 17 April 2026. It is a single page, signed by the financial controller.", "direct_debit_mandate_report_ZZ-59368.pdf - Direct debit mandate report from the bank for company bank account ZZ-59368, dated 1 July 2026. It is 2 pages, complete.", "unexplained_difference_investigation_note_ZZ-59368.pdf - Unexplained difference investigation note for company bank account ZZ-59368, dated 30 April 2026. It is 2 pages, complete, and signed by the financial controller.", "bank_charges_and_interest_explanation_sheet_ZZ-59368.pdf - Bank charges and interest explanation sheet for company bank account ZZ-59368, dated 13 June 2026. It is a single page, signed by the financial controller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 993}} {"id": "isc-te-00148-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Lombheim Ltd", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "1 June 2026"}, "checklist": ["Capital gains asset record", "Gift aid donation summary", "Rental income record", "Childcare payment receipt issued within the last 13 months", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Tax return draft printout, signed"], "submission": {"case": {"name": "household tax affairs ND-78453", "reference": "UP-21658", "details": ["The household sold a property other than its main home during the tax year."]}, "documents received": ["Property disposal calculation sheet for household tax affairs ND-78453, dated 7 February 2026. 2 pages, complete. Signed by the household's tax filer.", "Childcare payment receipt for household tax affairs ND-78453, dated 14 May 2026. Single page.", "Capital gains asset record for household tax affairs ND-78453, dated 9 May 2026. 2 pages, complete.", "Gift aid donation summary for household tax affairs ND-78453, dated 20 May 2026. Single page.", "Tax return draft printout for household tax affairs ND-78453, dated 2 February 2026. 6 pages, complete. Signed by the household's tax filer.", "Rental income record for household tax affairs ND-78453, dated 5 May 2026. 4 pages, complete.", "Bank interest statement for household tax affairs ND-78453, dated 13 July 2025. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 791}} {"id": "isc-te-00312-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Abrbury Ltd", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "26 May 2026"}, "checklist": ["Outbound loading record issued within the last 1 months and signed.", "Cross-dock slot booking sheet issued within the last 1 months and signed.", "Transfer manifest signed.", "Inbound unloading record issued within the last 1 months and signed.", "Transfer completion confirmation issued within the last 1 months and signed.", "Seal number log issued within the last 1 months and signed.", "If the transfer is an international movement, also: transit customs document, signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer LP-90487", "reference": "KA-79216", "details": ["The transfer is not an international movement.", "The transfer includes a temperature-controlled load."]}, "documents received": ["Cross-dock slot booking sheet for cross-dock transfer LP-90487, dated 24 May 2026, 1 page. Signed by the slot booking coordinator.", "Cross-dock chiller unit check sheet for cross-dock transfer LP-90487, dated 6 May 2026, 1 page. Signed by the chiller unit technician.", "Outbound loading record for cross-dock transfer LP-90487, dated 16 May 2026, 1 page. Signed by the outbound loading supervisor.", "Transfer manifest for cross-dock transfer LP-90487, dated 24 February 2026, 3 pages, complete. Signed by the transport planner.", "Damaged goods exception sheet for cross-dock transfer LP-90487, dated 20 May 2026, 1 page. Signed by the inbound unloading supervisor.", "Seal number log for cross-dock transfer LP-90487, dated 17 May 2026, 1 page. Signed by the sealing operative.", "Transfer completion confirmation for cross-dock transfer LP-90487, dated 14 May 2026, 1 page. Signed by the transfer coordinator.", "Inbound unloading record for cross-dock transfer LP-90487, dated 20 May 2026, 1 page. Signed by the inbound unloading supervisor.", "File 0011.pdf: the scan is blank and nothing on it can be read."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 952}} {"id": "isc-te-00181-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Wynstead Inc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "26 May 2026"}, "checklist": ["Leaver notification form, signed", "Shared mailbox handover record, issued within the last 1 month, signed", "Service desk ticket closure summary, issued within the last 1 month", "Line manager confirmation, issued within the last 1 month, signed", "Final payroll cut-off note, issued within the last 1 month, signed"], "submission": {"case": {"name": "James Fitzford", "reference": "IF-45020"}, "documents received": ["document_04.pdf. The contents of this file cannot be seen, as the scan is blank.", "final_payroll_cutoff_note.pdf. This final payroll cut-off note for James Fitzford is dated 8 May 2026 and is a single page. It is signed by the payroll officer.", "shared_mailbox_handover_record.pdf. This shared mailbox handover record for James Fitzford is dated 12 May 2026 and runs to 2 pages, complete. It is signed by the shared mailbox owner.", "service_desk_ticket_closure_summary.pdf. This service desk ticket closure summary for James Fitzford is dated 13 May 2026 and runs to 3 pages, complete.", "leaver_notification_form.pdf. This leaver notification form for James Fitzford is dated 1 February 2026 and runs to 2 pages, complete. It is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 719}} {"id": "isc-te-00255-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Yselmoor Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "28 August 2026"}, "checklist": ["Customer contact details sheet (signed)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Loyalty scheme enrolment form (signed)", "Marketing consent form (signed)", "Initial points balance statement (issued within the last 3 months)", "Identity verification document (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Camille Rookett", "reference": "EV-96904", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Terms and conditions acceptance sheet for Camille Rookett. It is dated 27 June 2026 and is a single page. It is signed by the member, Camille Rookett.", "Identity verification document for Camille Rookett. It is a single page. It shows an expiry date of 21 December 2028.", "Customer contact details sheet for Camille Rookett. It is dated 30 April 2026 and is a single page. It is signed by the member, Camille Rookett.", "Marketing consent form for Camille Rookett. It is dated 30 April 2026 and is a single page. It is signed by the member, Camille Rookett.", "Initial points balance statement for Camille Rookett. It is dated 17 July 2026 and is a single page. It shows the member's starting points balance.", "Loyalty scheme enrolment form for Camille Rookett. It is dated 9 May 2026 and is a single page. It is signed by the member, Camille Rookett."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 799}} {"id": "isc-te-00485-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskstead GmbH", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "28 August 2026"}, "checklist": ["Confirm the pack contains the signed draft lease, signed.", "Confirm the pack contains the title information document.", "Confirm the pack contains the energy performance certificate, valid (not expired) on the date of the review.", "Confirm the pack contains the keys handover receipt, signed.", "Confirm the pack contains the stamp duty return, signed.", "If the lease term is longer than seven years, also: land registration application, signed."], "submission": {"case": {"name": "premises MU-15688", "reference": "AJ-54933", "details": ["The lease term is longer than seven years."]}, "documents received": ["Keys handover receipt. Premises MU-15688. Date of issue: 2 June 2026. Single page. Signed by the tenant.", "Signed draft lease. Premises MU-15688. Date of issue: 6 May 2026. 12 pages, complete. Signed by the landlord and the tenant.", "Asbestos survey report. Premises MU-15688. Date of issue: 19 September 2025. 4 pages, complete.", "Land registration application. Premises MU-15688. Date of issue: 21 May 2026. 2 pages, complete. Signed by the landlord.", "Title information document. Premises MU-15688. Date of issue: 10 August 2026. 3 pages, complete.", "Energy performance certificate. Premises MU-15688. Expiry date: 15 December 2026. Single page.", "Stamp duty return. Premises MU-15688. Date of issue: 12 June 2026. 2 pages, complete. Signed by the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 818}} {"id": "isc-te-00117-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Istcombe plc", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "27 May 2026"}, "checklist": ["Include a previous grievance outcome letter issued within the last 24 months.", "Include a grievance procedure acknowledgement issued within the last 3 months and signed.", "If the grievance alleges bullying by a named colleague, also include a bullying allegation evidence log, signed.", "Include an evidence bundle index, signed.", "Include a written grievance statement, signed.", "Include a meeting invitation with rights explained issued within the last 1 months.", "Include an adjustment request record issued within the last 3 months and signed."], "submission": {"case": {"name": "Piotr Aldthwaite", "reference": "RG-62178", "details": ["The grievance alleges bullying by a named colleague."]}, "documents received": ["PA-RG-62178-11 previous grievance outcome letter.pdf — A previous grievance output letter concerning Piotr Aldthwaite, dated 15 May 2024. 2 pages, complete.", "PA-RG-62178-02 grievance procedure acknowledgement.pdf — A grievance procedure acknowledgement concerning Piotr Aldthwaite, dated 4 April 2026. It is a single page and is signed by the HR case handler.", "PA-RG-62178-06 meeting invitation with rights explained.pdf — A meeting invitation with rights explained concerning Piotr Aldthwaite, dated 9 May 2026. It is a single page.", "PA-RG-62178-05 written grievance statement.pdf — A written grievance statement concerning Piotr Aldthwaite, dated 2 April 2026. 3 pages, complete, and signed by the employee.", "PA-RG-62178-03 bullying allegation evidence log.pdf — A bullying allegation evidence log concerning Piotr Aldthwaite, dated 2 May 2026. 3 pages, complete, and signed by the investigating officer.", "PA-RG-62178-04 evidence bundle index.pdf — An evidence bundle index concerning Piotr Aldthwaite, dated 5 February 2026. 2 pages, complete, and signed by the case coordinator.", "PA-RG-62178-10 investigator appointment letter.pdf — An investigator appointment letter concerning Piotr Aldthwaite, dated 15 May 2026. It is a single page.", "PA-RG-62178-07 adjustment request record.pdf — An adjustment request record concerning Piotr Aldthwaite, dated 19 March 2026. It is a single page and is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 987}} {"id": "isc-te-00135-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Corvburg plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "16 September 2026"}, "checklist": ["Certified quality management system certificate, valid (not expired) on the date of the review.", "Supplier audit report, issued within the last 24 months, signed.", "Supplier self-assessment report, issued within the last 12 months, signed.", "Supplier corrective action plan, issued within the last 6 months, signed."], "submission": {"case": {"name": "Larvhall Ltd", "reference": "DV-11392"}, "documents received": ["Single-page certified quality management system certificate for Larvhall Ltd, showing an expiry date of 20 May 2028.", "Supplier corrective action plan for Larvhall Ltd, issued 26 June 2026, 3 pages, complete. Signed by the Larvhall quality manager.", "Supplier audit report for Larvhall Ltd, issued 14 August 2026, 8 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 620}} {"id": "isc-te-00253-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Thalmont plc", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "28 July 2026"}, "checklist": ["Cost-benefit justification included.", "If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review.", "Grant fund eligibility note included, issued within the last 6 months, signed.", "Vendor quotation included, issued within the last 3 months.", "If the equipment is above the major purchase threshold, also: tender waiver justification, signed.", "Maintenance plan included."], "submission": {"case": {"name": "equipment ZW-36248", "reference": "IQ-19665", "details": ["The equipment uses no radioactive sources.", "The equipment is below the major purchase threshold."]}, "cover note": "Please find the approval pack for reference IQ-19665. This pack was already checked by a colleague prior to submission.", "documents received": ["Vendor quotation for equipment ZW-36248, dated 19 June 2026. Pages 1 to 2 are included; the total number of pages is not shown anywhere.", "Maintenance plan for equipment ZW-36248, dated 15 April 2026. 2 pages, complete.", "Grant fund eligibility note for equipment ZW-36248, dated 8 February 2026, 1 page. Signed by the research grants officer.", "Cost-benefit justification for equipment ZW-36248, dated 4 June 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 2, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 737}} {"id": "isc-te-00087-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Lindcourt plc", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "3 April 2026"}, "checklist": ["Travel insurance quote issued within the last 1 months", "Special requests note, signed", "Passport details form, signed", "Booking request form, signed"], "submission": {"case": {"name": "holiday booking NN-90265", "reference": "KO-80548"}, "documents received": ["Passport details form for holiday booking NN-90265, dated 23 February 2026. Single page, signed by the customer.", "Special requests note for holiday booking NN-90265, dated 13 December 2025. Single page, signed by the customer.", "Booking request form for holiday booking NN-90265, dated 6 February 2026. 2 pages, complete. Signed by the reservations clerk.", "Travel insurance quote for holiday booking NN-90265; the issue date is covered by a stamp and cannot be made out. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "expired", "defect": "date not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 629}} {"id": "isc-te-00230-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Stromheim Partners", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "18 September 2026"}, "checklist": ["Waste disposal plan: confirm it is included.", "If the kit includes an electrical display unit, also: electrical safety test certificate issued within the last 12 months, confirm it is included.", "Kit contents list: confirm it is included.", "Brand colour specification: confirm it is included.", "Kit cost breakdown issued within the last 3 months and signed: confirm it is included."], "submission": {"case": {"name": "merchandising kit QI-72418", "reference": "QU-47115", "details": ["The kit includes an electrical display unit."]}, "documents received": ["Shipping manifest for merchandising kit QI-72418. Date of issue: 4 September 2026. 2 pages, complete.", "Brand colour specification for merchandising kit QI-72418. Date of issue: 5 July 2026. 1 page.", "Electrical safety test certificate for merchandising kit QI-72418. Date of issue: 21 July 2026. 1 page.", "Kit contents list for merchandising kit QI-72418. Date of issue: 30 June 2026. 2 pages, complete.", "Kit cost breakdown for merchandising kit QI-72418. Date of issue: 3 July 2026. 2 pages, complete. Signed by the finance manager.", "Waste disposal plan for merchandising kit QI-72418. Date of issue: 31 July 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 781}} {"id": "isc-te-00477-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Faldcourt BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "26 June 2026"}, "checklist": ["Previous grievance outcome letter issued within the last 24 months.", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed.", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed.", "Witness list, signed.", "Grievance procedure acknowledgement issued within the last 3 months, signed.", "Adjustment request record issued within the last 3 months, signed.", "Written grievance statement, signed."], "submission": {"case": {"name": "Chloe Clemby", "reference": "EW-81989", "details": ["The grievance is against the employee's direct manager.", "The grievance alleges bullying by a named colleague."]}, "documents received": ["Adjustment request record, Chloe Clemby, issued 11 April 2026, single page. Signed by the occupational health adviser.", "Alternative manager reporting line note, Chloe Clemby, issued 5 June 2026, single page. Signed by the employee relations manager.", "Grievance procedure acknowledgement, Chloe Clemby, issued 16 May 2026, single page. Signed by Chloe Clemby.", "Witness list, Chloe Clemby, issued 21 April 2026, single page. Signed by the case handler.", "Written grievance statement, Chloe Clemby, issued 19 April 2026. 3 pages, complete. Signed by Chloe Clemby.", "Bullying allegation evidence log, Chloe Clemby, issued 19 May 2026. 3 pages, complete. Signed by the employee relations manager.", "Evidence bundle index, Chloe Clemby, issued 8 May 2026. 2 pages, complete. Signed by the case handler.", "Previous grievance outcome letter, Chloe Clemby, issued 8 July 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 831}} {"id": "isc-te-00230-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Stromheim Partners", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "18 September 2026"}, "checklist": ["Waste disposal plan: confirm it is included.", "If the kit includes an electrical display unit, also: electrical safety test certificate issued within the last 12 months, confirm it is included.", "Kit contents list: confirm it is included.", "Brand colour specification: confirm it is included.", "Kit cost breakdown issued within the last 3 months and signed: confirm it is included."], "submission": {"case": {"name": "merchandising kit QI-72418", "reference": "QU-47115", "details": ["The kit includes an electrical display unit."]}, "cover note": "I am not sure everything needed is in this pack.", "documents received": ["Brand colour specification for merchandising kit QI-72418. Date of issue: 5 July 2026. 1 page.", "Kit contents list for merchandising kit QI-72418. Date of issue: 30 June 2026. 2 pages, complete.", "Waste disposal plan for merchandising kit QI-72418. Date of issue: 31 July 2026. 1 page.", "Kit cost breakdown for merchandising kit QI-72418. Date of issue: 3 July 2026. 2 pages, complete. Signed by the finance manager.", "Electrical safety test certificate for merchandising kit QI-72418. Date of issue: 21 July 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 761}} {"id": "isc-te-00112-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lunhall Ltd", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "2 July 2026"}, "checklist": ["If the move includes taking furniture to a storage unit, also: storage unit access authorisation (signed)", "lifting equipment inspection report (issued within the last 6 months, signed)", "IT decommissioning certificate (issued within the last 1 months, signed)", "new floor snagging list (issued within the last 1 months, signed)", "movers insurance certificate (valid (not expired) on the date of the review)", "signed move plan (signed)", "crate hire agreement (signed)"], "submission": {"case": {"name": "office move project VB-98815", "reference": "KT-58591", "details": ["The move includes taking furniture to a storage unit."]}, "documents received": ["KT-58591 Lifting equipment inspection report VB-98815.pdf. This is a lifting equipment inspection report for office move project VB-98815, dated 16 February 2026. 2 pages, complete. It has been signed by the lifting equipment inspector.", "KT-58591 Crate hire agreement VB-98815.pdf. This is a crate hire agreement for office move project VB-98815, dated 9 June 2026. 2 pages, complete. It has been signed by the supplier's representative.", "KT-58591 Furniture inventory list VB-98815.pdf. This is a furniture inventory list for office move project VB-98815, dated 19 June 2026. 4 pages, complete. It has been signed by the facilities coordinator.", "KT-58591 Parking bay suspension approval VB-98815.pdf. This is a one-page parking bay suspension approval for office move project VB-98815, dated 18 June 2026. It has been signed by the local authority parking officer.", "KT-58591 Signed move plan VB-98815.pdf. This is a signed move plan for office move project VB-98815, dated 11 June 2026. 6 pages, complete. It has been signed by the project manager.", "KT-58591 Storage unit access authorisation VB-98815.pdf. This is a one-page storage unit access authorisation for office move project VB-98815, dated 4 June 2026. It has been signed by the facilities manager.", "KT-58591 New floor snagging list VB-98815.pdf. This is a new floor snagging list for office move project VB-98815, 3 pages, complete. Its date of issue cannot be made out, as it is covered by a stamp. It has been signed by the site manager.", "KT-58591 Movers insurance certificate VB-98815.pdf. This is a one-page movers insurance certificate for office move project VB-98815. It shows an expiry date of 20 May 2027.", "KT-58591 IT decommissioning certificate VB-98815.pdf. This is a one-page IT decommissioning certificate for office move project VB-98815, dated 16 June 2026. It has been signed by the IT manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1157}} {"id": "isc-te-00272-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Teskham SAS", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "2 June 2026"}, "checklist": ["Access rights inventory, issued within the last 1 month.", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 month, signed.", "Final payroll cut-off note, issued within the last 1 month, signed.", "Line manager confirmation, issued within the last 1 month, signed.", "Non-disclosure reminder acknowledgement, signed.", "Equipment return receipt, issued within the last 1 month, signed.", "If the leaver is moving to a competitor, also: confidential data removal attestation, issued within the last 1 month, signed.", "Service desk ticket closure summary, issued within the last 1 month."], "submission": {"case": {"name": "Francesca Cormmore", "reference": "XV-89813", "details": ["The leaver held no privileged administrator accounts.", "The leaver is moving to a competitor."]}, "cover note": "Please accept my apologies that this pack was put together in a rush. I hope it reaches you in good time for the review.", "documents received": ["non_disclosure_reminder_acknowledgement_cormmore.pdf - Non-disclosure reminder acknowledgement for Francesca Cormmore. Date of issue: 11 February 2026. Single page, signed by the departing employee.", "final_payroll_cutoff_note_cormmore.pdf - Final payroll cut-off note for Francesca Cormmore. Date of issue: 31 May 2026. Single page, signed by the Payroll Manager.", "leaver_notification_form_cormmore.pdf - Leaver notification form for Francesca Cormmore. Date of issue: 19 April 2026. 2 pages, complete, signed by the HR Adviser.", "confidential_data_removal_attestation_cormmore.pdf - Confidential data removal attestation for Francesca Cormmore. Date of issue: 25 May 2026. Single page, signed by the Information Security Officer.", "access_rights_inventory_cormmore.pdf - Access rights inventory for Francesca Cormmore. Date of issue: 21 May 2026. 4 pages, complete.", "service_desk_ticket_closure_summary_cormmore.pdf - Service desk ticket closure summary for Francesca Cormmore. Date of issue: 30 May 2026. 3 pages, complete.", "equipment_return_receipt_cormmore_21_mar.pdf - Equipment return receipt for Francesca Cormmore. Date of issue: 21 March 2026. Single page, signed by the IT Asset Coordinator.", "equipment_return_receipt_cormmore_7_may.pdf - Equipment return receipt for Francesca Cormmore. Date of issue: 7 May 2026. Single page, signed by the IT Asset Coordinator.", "line_manager_confirmation_cormmore.pdf - Line manager confirmation for Francesca Cormmore. Date of issue: 31 May 2026. Single page, signed by the Line Manager."]}}, "question": {"type": "choice", "instructions": "Is this pack complete when measured against the checklist? Go line by line through every checklist item relevant to this case. To count, a required document must be the kind of document listed (a similar kind will not do), be about the subject of the case, have all its pages present, be signed wherever the checklist asks for a signature, not be expired on the date of the review, and have been issued during the period the checklist allows. A conditional line applies only where its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, such as a needed date, signature or page count not being visible, a document's kind being impossible to tell, or the case details not saying whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "variant-7", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1053}} {"id": "isc-te-00257-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Pentmont Inc", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "16 September 2026"}, "checklist": ["Policy breach summary, issued within the last 3 months, signed.", "Complaint escalation form, issued within the last 1 months, signed.", "Complaint category code sheet.", "Original complaint record, issued within the last 6 months."], "submission": {"case": {"name": "escalated complaint XT-33373", "reference": "KA-91939"}, "documents received": ["Proposed resolution letter draft for escalated complaint XT-33373, dated 21 May 2026. 2 pages, complete. Signed by the Customer Relations Manager.", "Complaint escalation form for escalated complaint XT-33373, dated 2 August 2026. 2 pages, complete. Signed by the Customer Relations Manager.", "Original complaint record for escalated complaint XT-33373, dated 8 April 2026. 2 pages, complete.", "Complaint category code sheet for escalated complaint XT-33373, dated 27 July 2026. Single page.", "Store incident report for escalated complaint XT-33373, dated 5 July 2026. 2 pages, complete. Signed by the Store Manager.", "Policy breach summary for escalated complaint XT-33373, dated 26 August 2026. 2 pages, complete. Signed by the Customer Relations Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 730}} {"id": "isc-te-00352-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Nordston GmbH", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "4 March 2026"}, "checklist": ["If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter (issued within the last 3 months, signed)", "remediation items list (issued within the last 3 months, signed)", "follow-up owner assignment sheet (issued within the last 3 months, signed)", "root cause analysis report (issued within the last 3 months, signed)", "alerting rules review note (issued within the last 3 months)", "customer impact statement (issued within the last 3 months)", "postmortem meeting minutes (issued within the last 3 months, signed)"], "submission": {"case": {"name": "production incident MC-46081", "reference": "MU-34394", "details": ["The incident was caused by a third-party service outage."]}, "documents received": ["Service level objective breach record for production incident MC-46081, dated 29 December 2025. It is 1 page.", "Vendor outage acknowledgement letter for production incident MC-46081, dated 15 February 2026. It is 1 page and is signed by the vendor's service manager.", "Follow-up owner assignment sheet for production incident MC-46081, dated 3 January 2026. It is 1 page and is signed by the incident manager.", "Root cause analysis report for production incident MC-46081, dated 7 February 2026. It is 5 pages, complete, and is signed by the lead reliability engineer.", "Incident timeline for production incident MC-46081, dated 17 February 2026. It is 3 pages, complete.", "Postmortem meeting minutes for production incident MC-46081, dated 7 February 2026. It is 3 pages, complete, and is signed by the meeting chair.", "Alerting rules review note for production incident MC-46081, dated 15 February 2026. It is 2 pages, complete.", "Customer impact statement for production incident MC-46081, dated 3 November 2024. It is 2 pages, complete.", "Remediation items list for production incident MC-46081, dated 2 March 2026. It is 2 pages, complete, and is signed by the remediation lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 943}} {"id": "isc-te-00055-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Pellby Group", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "19 June 2026"}, "checklist": ["Gifted deposit letter, issued within the last 3 months and signed", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months and signed", "Proof of deposit savings, issued within the last 3 months", "P60 tax summary, issued within the last 15 months", "Property valuation report, issued within the last 3 months and signed", "Mortgage application form, issued within the last 3 months and signed", "Three most recent payslips, issued within the last 3 months"], "submission": {"case": {"name": "Tyler Ebbaker", "reference": "JB-96407", "details": ["The borrower is self-employed."]}, "documents received": ["gifted_deposit_letter.pdf. A gifted deposit letter concerning Tyler Ebbaker, dated 5 April 2026. It is a single page and has been signed by the donor of the gift.", "mortgage_application_form.pdf. A mortgage application form concerning Tyler Ebbaker, dated 7 May 2026. 10 pages, complete. It has been signed by the applicant.", "payslips.pdf. Three most recent payslips concerning Tyler Ebbaker, dated 14 June 2026. 3 pages, complete.", "bank_statements.pdf. Three months of bank statements concerning Tyler Ebbaker, dated 5 May 2026. 9 pages, complete.", "p60_tax_summary.pdf. A P60 tax summary concerning Tyler Ebbaker, dated 18 February 2026. 2 pages, complete.", "proof_of_deposit_savings.pdf. A proof of deposit savings concerning Tyler Ebbaker, dated 3 May 2026. 2 pages, complete.", "property_valuation_report.pdf. A property valuation report concerning Tyler Ebbaker, dated 31 May 2026. 8 pages, complete. It has been signed by the surveyor who carried out the valuation.", "tax_year_overviews.pdf. Two most recent tax year overviews concerning Tyler Ebbaker, dated 12 December 2025. 4 pages, complete. They have been signed by HM Revenue and Customs."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 898}} {"id": "isc-te-00177-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vaskness Limited", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "29 July 2026"}, "checklist": ["Flight availability printout, issued within the last 1 months", "Hotel availability printout, issued within the last 1 months, signed", "Passport details form, signed", "Special requests note, signed", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review", "Travel insurance quote, issued within the last 1 months"], "submission": {"case": {"name": "holiday booking BX-25277", "reference": "CW-76801", "details": ["The booking includes a child traveller."]}, "documents received": ["Hotel availability printout for holiday booking BX-25277, dated 17 July 2026. 2 pages, complete. Signed by the reservations manager.", "Travel insurance quote for holiday booking BX-25277, dated 6 July 2026. 2 pages, complete.", "Special requests note for holiday booking BX-25277, dated 23 April 2026. 1 page. Signed by the lead traveller.", "Travel insurance quote for holiday booking BX-25277, dated 30 September 2024. 2 pages, complete.", "Child passport copy for holiday booking BX-25277, showing an expiry date of 2 December 2028. 1 page.", "Booking request form for holiday booking BX-25277, dated 12 April 2026. 2 pages, complete. Signed by the lead traveller.", "Passport details form for holiday booking BX-25277, dated 9 May 2026. 1 page. Signed by the lead traveller.", "File scan-0416.doc. The file will not open, so its contents cannot be seen.", "Flight availability printout for holiday booking BX-25277, dated 12 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 853}} {"id": "isc-te-00232-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Gormshaw GmbH", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "11 March 2026"}, "checklist": ["If the kit contains food samples, also: food handling hygiene certificate (must be valid, that is not expired, on the date of the review)", "Kit cost breakdown (issued within the last 3 months and signed)", "Flammability test certificate (issued within the last 12 months)", "Point of sale design proof (signed)", "Brand colour specification"], "submission": {"case": {"name": "merchandising kit LC-39176", "reference": "WQ-22781", "details": ["The kit contains no food samples."]}, "cover note": "Here is the pack as I have it at the moment, though I cannot be certain it has all that is needed. Let me know if anything more should have gone in.", "documents received": ["Brand colour specification, merchandising kit LC-39176. The date of issue is 3 February 2026. Single page.", "Kit cost breakdown, merchandising kit LC-39176. The date of issue is 23 April 2024, and it is signed by the retail marketing manager. 2 pages, complete.", "Kit cost breakdown, merchandising kit LC-39176. The date of issue is 31 December 2025, and it is signed by the retail marketing manager. 2 pages, complete.", "Waste disposal plan, merchandising kit LC-39176. The date of issue is 31 December 2025. Single page.", "Point of sale design proof, merchandising kit LC-39176. The date of issue is 18 January 2026, and it is signed by the design studio lead. 4 pages, complete.", "Flammability test certificate, merchandising kit LC-39176. The date of issue is 23 October 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00363-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Baxfeld & Co", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "7 May 2026"}, "checklist": ["Firewall change request form, signed.", "Peer review checklist, issued within the last 1 month, signed.", "Proposed rule change specification, signed.", "Rollback plan, signed.", "If the change is planned during the year-end close period, also: freeze period exception approval, signed.", "Business justification memo, issued within the last 3 months, signed."], "submission": {"case": {"name": "firewall change CX-23740", "reference": "UB-55755", "details": ["The change is planned during the year-end close period."]}, "cover note": "Please find attached the change pack for firewall change CX-23740. Everything needed is attached and complete.", "documents received": ["Rollback plan for firewall change CX-23740. Date of issue: 28 March 2026. 2 pages, complete. Signed by the change manager.", "Peer review checklist for firewall change CX-23740. Date of issue: 5 May 2026. Single page. Signed by the peer reviewer.", "Risk assessment for firewall change CX-23740. Date of issue: 15 April 2026. 2 pages, complete. Signed by the information security officer.", "Current rule set export for firewall change CX-23740. Date of issue: 29 April 2026. 8 pages, complete.", "Business justification memo for firewall change CX-23740. Date of issue: 17 March 2026. Single page. The area where the signature would be is cropped, so it is not known whether the memo is signed.", "Firewall change request form for firewall change CX-23740. Date of issue: 16 April 2026. 3 pages, complete. Signed by the requesting change manager.", "Proposed rule change specification for firewall change CX-23740. Date of issue: 7 February 2026. 2 pages, complete. Signed by the network engineer who prepared the specification.", "Freeze period exception approval for firewall change CX-23740. Date of issue: 18 March 2026. Single page. Signed by the head of the change advisory board."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 919}} {"id": "isc-te-00422-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pentridge Ltd", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "1 May 2026"}, "checklist": ["Supplier response letter, issued within the last 3 months and signed", "Contract compliance checklist, signed", "Quality inspection report, issued within the last 6 months and signed", "If the supplier is being considered for an expanded scope, also: expanded scope assessment memo, signed", "Invoice discrepancy log", "Delivery record summary, issued within the last 12 months"], "submission": {"case": {"name": "Lombcombe BV", "reference": "RE-90972", "details": ["The supplier's scope is staying the same."]}, "documents received": ["Quality inspection report for Lombcombe BV, dated 24 April 2026. 3 pages, complete. Signed by the quality inspector.", "Invoice discrepancy log for Lombcombe BV, dated 1 January 2026. 2 pages, complete.", "Delivery record summary for Lombcombe BV, dated 7 January 2026. 2 pages, complete.", "Contract compliance checklist for Lombcombe BV, dated 5 January 2026. 3 pages, complete. Signed by the procurement lead.", "Supplier response letter for Lombcombe BV, dated 11 November 2025. A single page, signed by the supplier's account manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 682}} {"id": "isc-te-00313-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Istshaw Partners", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "31 July 2026"}, "checklist": ["Cross-dock slot booking sheet, issued within the last 1 months and signed.", "Inbound unloading record, issued within the last 1 months and signed.", "Seal number log, issued within the last 1 months and signed.", "Transfer completion confirmation, issued within the last 1 months and signed.", "Load consolidation sheet, issued within the last 3 months and signed.", "If the transfer is an international movement, also: transit customs document, signed.", "Outbound loading record, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer TG-84110", "reference": "CV-81739", "details": ["The transfer is an international movement."]}, "documents received": ["Outbound loading record for cross-dock transfer TG-84110, dated 24 July 2026. Single page. Signed by the outbound loading team leader.", "Cross-dock slot booking sheet for cross-dock transfer TG-84110, dated 21 July 2026. Single page. Signed by the cross-dock coordinator.", "Transfer completion confirmation for cross-dock transfer TG-84110, dated 12 July 2026. Single page. Signed by the transport planner.", "Inbound unloading record for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the inbound unloading supervisor.", "Load consolidation sheet for cross-dock transfer TG-84110, dated 26 July 2026. 2 pages, complete. Signed by the load consolidation coordinator.", "Seal number log for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the outbound gatekeeper.", "Transit customs document for cross-dock transfer TG-84110, dated 26 June 2026. 4 pages, complete. Signed by the customs agent."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "partial", "defect": "signed", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 862}} {"id": "isc-te-00176-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Larvcliff Partners", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "9 March 2026"}, "checklist": ["Check that the pack contains a hotel invoice issued within the last 6 months.", "Check that the pack contains a train ticket receipt.", "Check that the pack contains a signed expense claim form.", "Check that the pack contains a conference fee invoice issued within the last 12 months.", "Check that the pack contains a restaurant receipt issued within the last 6 months."], "submission": {"case": {"name": "Lucy Wraxock", "reference": "HW-17248"}, "documents received": ["Restaurant receipt for Lucy Wraxock. Date of issue: 10 October 2025. Single page.", "Train ticket receipt for Lucy Wraxock. Date of issue: 18 December 2025. Single page.", "Currency conversion statement for Lucy Wraxock. Date of issue: 5 November 2025. Single page.", "Expense claim form for Lucy Wraxock. Date of issue: 13 February 2026. 2 pages, complete. Signed by the claiming employee.", "Hotel key card sleeve for Lucy Wraxock. Date of issue: 9 November 2025. 2 pages, complete.", "Conference fee invoice for Lucy Wraxock. Date of issue: 31 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 695}} {"id": "isc-te-00225-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Haskmark Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "29 July 2026"}, "checklist": ["Certified quality management system certificate, valid (not expired) on the date of the review.", "Supplier corrective action plan, issued within the last 6 months and signed.", "Supplier audit report, issued within the last 24 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed.", "Raw material certificate of analysis, issued within the last 6 months and signed."], "submission": {"case": {"name": "Jaskfield LLP", "reference": "PX-41794"}, "documents received": ["Certified quality management system certificate for Jaskfield LLP, showing an expiry date of 29 November 2028. Single page.", "Raw material certificate of analysis for Jaskfield LLP, dated 26 March 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Supplier audit report for Jaskfield LLP, dated 28 July 2025. 8 pages, complete. Signed by the lead auditor.", "Supplier quality questionnaire for Jaskfield LLP, dated 16 July 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Supplier capacity declaration for Jaskfield LLP, dated 16 July 2026. 2 pages, complete. Signed by the supplier's operations director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 706}} {"id": "isc-te-00164-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Pellwick Group", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "15 April 2026"}, "checklist": ["Facility access application form, signed.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed.", "Beam time or instrument booking confirmation.", "Insurance declaration for facility work, issued within the last 12 months, signed.", "Home institution endorsement letter, issued within the last 6 months, signed.", "Experiment safety clearance form, signed."], "submission": {"case": {"name": "Madison Harvberg", "reference": "HI-86494", "details": ["The researcher will work outside standard opening hours."]}, "documents received": ["beam_time_booking_confirmation_harvberg.pdf. A beam time or instrument booking confirmation for Madison Harvberg, dated 25 December 2025. It is a single page.", "facility_access_application_form_harvberg.pdf. A facility access application form for Madison Harvberg, dated 23 February 2026. 2 pages, complete. It is signed by the facility manager.", "photo_identity_document_harvberg.pdf. A photo identity document for Madison Harvberg, showing an expiry date of 9 December 2026. It is a single page.", "home_institution_endorsement_letter_harvberg.pdf. A home institution endorsement letter for Madison Harvberg, dated 11 December 2025. It is a single page and is signed by the home institution's head of department.", "insurance_declaration_facility_work_harvberg.pdf. An insurance declaration for facility work for Madison Harvberg, dated 29 April 2025. It is a single page and is signed by the home institution's insurance officer.", "experiment_safety_clearance_form_harvberg.pdf. An experiment safety clearance form for Madison Harvberg, dated 8 April 2026. 3 pages, complete. It is signed by the facility safety officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 830}} {"id": "isc-te-00437-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Faldcourt & Co", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "5 August 2026"}, "checklist": ["Complaint escalation form, issued within the last 1 month and signed", "Proposed resolution letter draft, signed", "Customer contact log, issued within the last 3 months", "Policy breach summary, issued within the last 3 months and signed", "Original complaint record, issued within the last 6 months"], "submission": {"case": {"name": "escalated complaint BO-70275", "reference": "JZ-82529"}, "documents received": ["Policy breach summary for escalated complaint BO-70275, dated 13 June 2026. 2 pages, complete. Signed by the compliance officer.", "Customer contact log for escalated complaint BO-70275. The issue date is covered by a postage stamp. 3 pages, complete.", "Store incident report for escalated complaint BO-70275, dated 17 July 2026. 2 pages, complete. Signed by the store manager.", "Proposed resolution letter draft for escalated complaint BO-70275, dated 25 April 2026. 2 pages, complete. Signed by the customer relations manager.", "Original complaint record for escalated complaint BO-70275, dated 7 June 2026. 2 pages, complete.", "Complaint escalation form for escalated complaint BO-70275, dated 15 July 2026. 2 pages, complete. Signed by the customer relations team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 745}} {"id": "isc-te-00005-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ulmmoor LLP", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "6 May 2026"}, "checklist": ["Costed trip estimate sheet, issued within the last 3 months and signed", "Outstanding advance clearance check, signed", "Travel policy extract showing advance eligibility", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Marco Mundridge", "reference": "RH-30807"}, "documents received": ["Outstanding Advance Clearance Check. This single-page outstanding advance clearance check for Marco Mundridge is dated 13 April 2026 and is signed by the accounts payable reviewer.", "Payroll Deduction Agreement for Recovery of the Advance. This single-page payroll deduction agreement covering recovery of the advance for Marco Mundridge is dated 20 April 2026 and bears the employee's signature.", "Costed Trip Estimate Sheet. This single-page costed trip estimate sheet for Marco Mundridge is dated 23 March 2026 and carries the signature of the estimating clerk who prepared it."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 618}} {"id": "isc-te-00234-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Nordridge & Co", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "13 April 2026"}, "checklist": ["Confirm the pack includes an account purpose statement.", "Confirm the pack includes a two-factor authentication confirmation issued within the last 3 months.", "Confirm the pack includes an admin access list issued within the last 3 months.", "Confirm the pack includes a naming convention approval that is signed.", "If the account will post content about financial products, also confirm the pack includes a financial promotions approval note issued within the last 3 months and signed.", "Confirm the pack includes an account request form that is signed."], "submission": {"case": {"name": "new social media account WY-2923", "reference": "PH-42275", "details": ["The account will not post any content about financial products."]}, "documents received": ["Scanned account purpose statement about new social media account WY-2923, showing its date of issue as 29 December 2025. The scan is a single page.", "Scanned naming convention approval about new social media account WY-2923, showing its date of issue as 5 April 2026, and signed by the social media governance team lead. The scan is a single page.", "Scanned admin access list about new social media account WY-2923, showing its date of issue as 21 February 2026. The scan is a single page.", "Scanned two-factor authentication confirmation about new social media account WY-2923, showing its date of issue as 22 March 2026. The scan is a single page.", "Scanned account request form about new social media account WY-2923, showing its date of issue as 13 March 2026, and signed by the requesting marketing manager. The scan is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00002-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Hondford Limited", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "21 May 2026"}, "checklist": ["Firewall change request form, signed.", "Current rule set export, issued within the last 1 month.", "Post-change test plan, signed.", "Peer review checklist, issued within the last 1 month and signed.", "Proposed rule change specification, signed.", "Business justification memo, issued within the last 3 months and signed."], "submission": {"case": {"name": "firewall change DG-58616", "reference": "DU-21666"}, "documents received": ["Rollback plan for change DG-58616. Date of issue: 30 March 2026. 2 pages, complete. Signed by the operations lead.", "Proposed rule change specification for change DG-58616. Date of issue: 12 February 2026. 2 pages, complete. Signed by the senior firewall engineer.", "Peer review checklist for change DG-58616. Date of issue: 14 May 2026. Single page. Signed by the reviewing peer engineer.", "Business justification memo for change DG-58616. Date of issue: 19 June 2025. Single page. Signed by the requesting business manager.", "Current rule set export for change DG-58616. Date of issue: 12 May 2026. 8 pages, complete.", "Post-change test plan for change DG-58616. Date of issue: 27 April 2026. 2 pages, complete. Signed by the test lead.", "Firewall change request form for change DG-58616. Date of issue: 12 April 2026. 3 pages, complete. Signed by the requesting network engineer."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist. Go through every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete if every applicable line is met (extra documents do not matter). Choose incomplete if at least one applicable line is not met. Choose unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-30", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 818}} {"id": "isc-te-00145-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Jorgard Ltd", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "13 May 2026"}, "checklist": ["If the property is a listed building, also: listed building consent (issued within the last 12 months, signed)", "energy performance certificate (valid (not expired) on the date of the review)", "If the household rents the home, also: landlord written permission (issued within the last 6 months, signed)", "scaffolding agreement (signed)", "planning permission letter (issued within the last 12 months)", "roof structural report (issued within the last 6 months, signed)"], "submission": {"case": {"name": "roof NL-16490", "reference": "UA-46931", "details": ["The property is not a listed building.", "The household owns the home."]}, "cover note": "Dear survey team, please find the pack for roof NL-16490, reference UA-46931. All the paperwork is in order, so I would be grateful for a quick approval. Kind regards, Giulia Knoxeau", "documents received": ["Insurance notification letter - roof NL-16490.pdf. The letter is about roof NL-16490 and shows a date of issue of 23 November 2025. It is a single page.", "Meter reading photo - roof NL-16490.pdf. The photo is about roof NL-16490 and shows a date of issue of 8 May 2026. It is a single page.", "Roof structural report - roof NL-16490.pdf. The report is about roof NL-16490 and shows a date of issue of 18 February 2026. 4 pages, complete. It is signed by the structural engineer.", "Scaffolding agreement - roof NL-16490.pdf. The agreement is about roof NL-16490 and shows a date of issue of 17 April 2026. 2 pages, complete. It is signed by the scaffolding contractor.", "Planning permission letter - roof NL-16490.pdf. The letter is about roof NL-16490 and shows a date of issue of 5 December 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 905}} {"id": "isc-te-00059-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Wynholm Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "15 April 2026"}, "checklist": ["Three months of bank statements, issued within the last 3 months.", "If the property being bought is a flat in a shared building, also: management company pack, issued within the last 3 months.", "Three most recent payslips, issued within the last 3 months.", "Gifted deposit letter, issued within the last 3 months, signed.", "Property valuation report, issued within the last 3 months, signed.", "Passport, valid (not expired) on the date of the review.", "Mortgage application form, issued within the last 3 months, signed."], "submission": {"case": {"name": "Burak Stanani", "reference": "ES-59536"}, "documents received": ["Proof of deposit savings for Burak Stanani, dated 4 March 2026. 2 pages, complete.", "Passport for Burak Stanani, showing an expiry date of 12 June 2026. 2 pages, complete.", "Gifted deposit letter for Burak Stanani, dated 27 January 2026. Single page, signed by the gift donor.", "P60 tax summary for Burak Stanani, dated 29 March 2026. 2 pages, complete.", "Three months of bank statements for Burak Stanani, dated 8 March 2026. 9 pages, complete.", "Mortgage application form for Burak Stanani, dated 11 April 2026. 10 pages, complete, signed by the borrower.", "Three most recent payslips for Burak Stanani, dated 25 February 2026. 3 pages, complete.", "Management company pack for Burak Stanani, dated 12 April 2026. 12 pages, complete.", "Property valuation report for Burak Stanani, dated 7 February 2026. 8 pages, complete, signed by the surveyor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 838}} {"id": "isc-te-00016-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Jundburg Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "7 July 2026"}, "checklist": ["Payment confirmation, issued within the last 3 months.", "Prerequisite certificate.", "Venue access instructions, issued within the last 3 months.", "If the delegate requires an adjusted learning plan, also: learning support agreement, signed.", "Course booking form, signed.", "Cancellation policy acceptance, signed.", "Special requirements note."], "submission": {"case": {"name": "course booking MS-72228", "reference": "IX-67327", "details": ["The delegate requires an adjusted learning plan."]}, "cover note": "I have put the pack together for course booking MS-72228, but I am not sure everything needed is there, so please check it over before the place is confirmed.", "documents received": ["venue_access_instructions_1May2026.pdf: Venue access instructions about course booking MS-72228. It shows a date of issue of 1 May 2026 and is a single page.", "learning_support_agreement_19Mar2026.pdf: A learning support agreement about course booking MS-72228. It shows a date of issue of 19 March 2026, is a single page and bears the signature of the course administrator.", "special_requirements_note_17Mar2026.pdf: A special requirements note about course booking MS-72228. It shows a date of issue of 17 March 2026 and is a single page.", "payment_confirmation_17May2026.pdf: A payment confirmation about course booking MS-72228. It shows a date of issue of 17 May 2026 and is a single page.", "employer_sponsorship_letter_16Jun2026.pdf: An employer sponsorship letter about course booking MS-72228. It shows a date of issue of 16 June 2026, is a single page and bears the signature of the employer's HR manager.", "prerequisite_certificate_12Jun2026.pdf: A prerequisite certificate about course booking MS-72228. It shows a date of issue of 12 June 2026 and is a single page.", "delegate_photo_identification_13Oct2028.pdf: Delegate photo identification about course booking MS-72228. It shows an expiry date of 13 October 2028 and is a single page.", "screenshot_basket_17May2026.pdf: A screenshot of items left in an online basket about course booking MS-72228. It shows a date of issue of 17 May 2026 and is a single page.", "course_booking_form_22Apr2026.pdf: A course booking form about course booking MS-72228. It shows a date of issue of 22 April 2026 and has 2 pages, complete. It bears the signature of the delegate.", "cancellation_policy_acceptance_12Apr2026.pdf: A cancellation policy acceptance about course booking MS-72228. It shows a date of issue of 12 April 2026, is a single page and bears the signature of the delegate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 10, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1125}} {"id": "isc-te-00485-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskstead GmbH", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "28 August 2026"}, "checklist": ["Confirm the pack contains the signed draft lease, signed.", "Confirm the pack contains the title information document.", "Confirm the pack contains the energy performance certificate, valid (not expired) on the date of the review.", "Confirm the pack contains the keys handover receipt, signed.", "Confirm the pack contains the stamp duty return, signed.", "If the lease term is longer than seven years, also: land registration application, signed."], "submission": {"case": {"name": "premises MU-15688", "reference": "AJ-54933", "details": ["The lease term is longer than seven years."]}, "cover note": "Hello, please find the pack for review. A colleague has already checked it. Best regards, Robert Elmstow", "documents received": ["Asbestos survey report. Premises MU-15688. Date of issue: 19 September 2025. 4 pages, complete.", "Stamp duty return. Premises MU-15688. Date of issue: 12 June 2026. 2 pages, complete. Signed by the tenant.", "Title information document. Premises MU-15688. Date of issue: 10 August 2026. 3 pages, complete.", "Land registration application. Premises MU-15688. Date of issue: 21 May 2026. 2 pages, complete. Signed by the landlord.", "Energy performance certificate. Premises MU-15688. Expiry date: 15 December 2026. Single page.", "Signed draft lease. Premises MU-15688. Date of issue: 6 May 2026. 12 pages, complete. Signed by the landlord and the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 810}} {"id": "isc-te-00340-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Eskness Limited", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "25 March 2026"}, "checklist": ["Training needs assessment (signed)", "Vendor quotation (issued within the last 3 months)", "Equipment purchase request form (signed)", "Three quotes comparison sheet (issued within the last 3 months, signed)", "Cost-benefit justification"], "submission": {"case": {"name": "equipment NP-85998", "reference": "KG-36968"}, "documents received": ["Vendor quotation - NP-85998.pdf - Vendor quotation for equipment NP-85998, dated 8 February 2026. 2 pages, complete.", "Three quotes comparison sheet - NP-85998.pdf - Three quotes comparison sheet for equipment NP-85998, dated 11 March 2026. 1 page. Signed by the procurement lead.", "Equipment purchase request form - NP-85998.pdf - Equipment purchase request form for equipment NP-85998, dated 19 March 2026. 2 pages, complete. Signed by the requesting department manager.", "Cost-benefit justification - NP-85998.pdf - Cost-benefit justification for equipment NP-85998, dated 13 March 2026. 3 pages, complete.", "Grant fund eligibility note - NP-85998.pdf - Grant fund eligibility note for equipment NP-85998, dated 15 January 2026. 1 page. Signed by the grants officer.", "Maintenance plan - NP-85998.pdf - Maintenance plan for equipment NP-85998, dated 21 December 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack matches the checklist. Take each checklist line that applies to this case in turn. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete: every applicable line is met (extra documents do not matter). Choose incomplete: at least one applicable line is not met. Choose unclear: no line is clearly unmet, but at least one cannot be decide from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-20", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00417-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Vaskhall Group", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "10 September 2026"}, "checklist": ["Confirm the pack contains proof of deposit savings issued within the last 3 months.", "Confirm the pack contains a property valuation report issued within the last 3 months and signed.", "Confirm the pack contains the three most recent payslips issued within the last 3 months.", "Confirm the pack contains three months of bank statements issued within the last 3 months."], "submission": {"case": {"name": "Simon Foskani", "reference": "JA-60691"}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["JA-60691_passport_Foskani.pdf - Passport for Simon Foskani, expiry date 5 December 2026. 2 pages, complete.", "JA-60691_property-valuation-report-3_Foskani.pdf - Property valuation report for Simon Foskani, dated 15 January 2026, signed by the valuer. 8 pages, complete.", "JA-60691_proof-of-deposit-savings_Foskani.pdf - Proof of deposit savings for Simon Foskani, dated 7 September 2026. 2 pages, complete.", "JA-60691_property-valuation-report-2_Foskani.pdf - Property valuation report for Simon Foskani, dated 16 June 2026, signed by the valuer. 8 pages, complete.", "JA-60691_payslips_Foskani.pdf - Three most recent payslips for Simon Foskani, dated 31 July 2026. 3 pages, complete.", "JA-60691_bank-statements_Foskani.pdf - Three months of bank statements for Simon Foskani, dated 25 July 2026. 9 pages, complete."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Output complete if every applicable line is met (extra documents do not matter). Output incomplete if at least one applicable line is not met. Output unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so base your judgement on the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-31", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00044-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Abrmouth Partners", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "2 April 2026"}, "checklist": ["Utilities connection certificate on file.", "Warehouse insurance policy on file, valid (not expired) on the date of the review.", "Planning permission on file.", "Signed lease agreement on file, signed.", "Racking inspection report on file, issued within the last 12 months and signed.", "If the warehouse site is in a flood risk area, also: flood risk assessment, signed.", "Fire safety certificate on file, valid (not expired) on the date of the review."], "submission": {"case": {"name": "warehouse UE-7753", "reference": "YO-81533", "details": ["The warehouse site is in a flood risk area."]}, "documents received": ["Planning permission for warehouse UE-7753. Date of issue: 24 February 2026. 2 pages, complete.", "Floor load capacity report for warehouse UE-7753. Date of issue: 9 February 2026. 3 pages, complete. Signed by the structural engineer.", "Signed lease agreement for warehouse UE-7753. Date of issue: 6 January 2026. 8 pages, complete. Signed by the landlord and the tenant.", "Fire safety certificate for warehouse UE-7753. Expiry date: 29 November 2026. 2 pages, complete.", "Utilities connection certificate for warehouse UE-7753. Date of issue: 8 December 2025. Single page.", "Warehouse insurance policy for warehouse UE-7753. Expiry date: 14 April 2027. 6 pages, complete.", "Racking inspection report for warehouse UE-7753. Date of issue: 12 July 2025. 2 pages, complete. Signed by the racking inspector."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00387-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Oxlfell Group", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "22 July 2026"}, "checklist": ["Confirm the pack contains a contact plan for time away.", "Confirm the pack contains a handover note, signed.", "If the employee is requesting leave during a known busy period, also: confirm the pack contains a business case for peak-period leave, signed.", "Confirm the pack contains a team holiday planner extract.", "Confirm the pack contains a manager approval email issued within the last 2 months."], "submission": {"case": {"name": "Gustavo Rookton", "reference": "VB-36010", "details": ["The employee is not requesting leave during a known busy period."]}, "cover note": "Everything needed is attached and complete.", "documents received": ["Contact plan for time away. The plan covers Gustavo Rookton and shows its date of issue as 11 July 2026. It is a single page.", "Handover note. The note concerns Gustavo Rookton and shows its date of issue as 29 May 2026. It runs to 2 pages, complete, and is signed by the employee.", "Team holiday planner extract. The extract concerns Gustavo Rookton and shows its date of issue as 11 May 2026. It runs to 2 pages, complete.", "Manager approval email. The email concerns Gustavo Rookton and shows its date of issue as 12 May 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 718}} {"id": "isc-te-00244-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Elstley plc", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 June 2026"}, "checklist": ["Travel request form, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Travel policy acknowledgement, signed.", "Hotel booking confirmation.", "Passport copy for international travel, valid (not expired) on the date of the review."], "submission": {"case": {"name": "business trip CM-86741", "reference": "KC-24296", "details": ["The trip involves no country requiring a visa."]}, "documents received": ["CM-86741_visa_entry_requirement_printout.pdf. Visa entry requirement printout for business trip CM-86741, issued 13 April 2026, 2 pages, complete.", "CM-86741_travel_request_form.pdf. Travel request form for business trip CM-86741, issued 3 May 2026. Signed by the traveller, 2 pages, complete.", "CM-86741_travel_policy_acknowledgement.pdf. Travel policy acknowledgement for business trip CM-86741, issued 21 May 2026. Signed by the traveller, single page.", "File_0092.pdf. The file will not open, so its contents cannot be seen.", "CM-86741_passport_copy.pdf. Passport copy for international travel for business trip CM-86741, single page. The passport expires 10 December 2028.", "CM-86741_hotel_booking_confirmation.pdf. Hotel booking confirmation for business trip CM-86741, issued 28 February 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 783}} {"id": "isc-te-00381-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Teskhurst Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "10 July 2026"}, "checklist": ["Engineer's service report, issued within the last 1 months and signed", "System pressure test results, issued within the last 1 months and signed", "Asset condition photograph sheet, issued within the last 1 months", "Plant room access sign-in sheet", "Refrigerant top-up log, issued within the last 1 months and signed", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "If refrigerant was added during the service, also: refrigerant recovery note, issued within the last 1 months and signed"], "submission": {"case": {"name": "air conditioning system OO-39937", "reference": "DM-20771", "details": ["Refrigerant was added during the service."]}, "documents received": ["Service_Report_OO-39937.pdf. Engineer's service report for air conditioning system OO-39937, dated 27 June 2026. 3 pages, complete. Signed by the service engineer.", "Sign_In_OO-39937.pdf. Plant room access sign-in sheet for air conditioning system OO-39937, dated 24 June 2026. Single page.", "Pressure_Test_OO-39937.pdf. System pressure test results for air conditioning system OO-39937, dated 4 July 2026. 2 pages, complete. Signed by the testing engineer.", "Leak_Check_OO-39937.pdf. F-gas leak check record for air conditioning system OO-39937, dated 17 September 2025. 2 pages, complete. Signed by the inspecting engineer.", "Condition_Photos_OO-39937.pdf. Asset condition photograph sheet for air conditioning system OO-39937, dated 29 June 2026. 2 pages, complete.", "F_Gas_Certificate_OO-39937.pdf. Engineer F-gas handling certificate for air conditioning system OO-39937, with an expiry date of 2 July 2028. Single page.", "Recovery_Note_OO-39937.pdf. Refrigerant recovery note for air conditioning system OO-39937, dated 21 June 2026. Single page. Signed by the recovering engineer.", "Top_Up_Log_QA-19462.pdf. Refrigerant top-up log for air conditioning system QA-19462, dated 8 July 2026. Single page. Signed by the service engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 998}} {"id": "isc-te-00476-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Elstton Partners", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "13 August 2026"}, "checklist": ["Leave balance statement issued within the last 3 months.", "Completed annual leave request form, signed.", "Manager approval email issued within the last 2 months.", "Return to work date confirmation.", "Statutory holiday entitlement confirmation.", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave, signed.", "Team holiday planner extract."], "submission": {"case": {"name": "Khalid Sabnall", "reference": "ZF-30873", "details": ["The employee is not requesting leave during a known busy period."]}, "cover note": "Please approve this pack as soon as you can, as all the paperwork is in order. Thank you.", "documents received": ["Poster about holiday rights for Khalid Sabnall, issued 1 June 2026. Single page.", "Leave balance statement for Khalid Sabnall, issued 16 June 2026. Single page.", "Manager approval email for Khalid Sabnall, issued 8 July 2026. Single page.", "Return to work date confirmation for Khalid Sabnall, issued 16 July 2026. Single page.", "Handover note for Khalid Sabnall, issued 9 May 2026. 2 pages, complete. Signed by the line manager.", "Completed annual leave request form for Khalid Sabnall, issued 19 June 2026. Single page, signed by the employee.", "Team holiday planner extract for Khalid Sabnall, issued 18 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-74", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 770}} {"id": "isc-te-00484-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Mersmore LLP", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "7 September 2026"}, "checklist": ["CCTV footage stills of the incident, issued within the last 3 months", "staff training record for the duty manager, issued within the last 24 months, signed", "incident report from the day, issued within the last 3 months, signed", "photographs of the spillage on the floor, issued within the last 1 months", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months, signed", "witness statement from a staff member, signed"], "submission": {"case": {"name": "Elstvale Limited", "reference": "HM-93904", "details": ["The customer has appointed a solicitor for the claim."]}, "documents received": ["Photographs of the spillage on the floor relating to Elstvale Limited, dated 20 August 2026. 1 page.", "Staff training record for the duty manager relating to Elstvale Limited, dated 11 November 2025. 2 pages, complete. Signed by the training manager.", "Witness statement from a staff member relating to Elstvale Limited, dated 11 June 2026. 1 page. Signed by the staff member.", "CCTV footage stills of the incident relating to Elstvale Limited, dated 17 July 2026. 2 pages, complete.", "Liability claim form relating to Elstvale Limited, dated 26 May 2026. 3 pages, complete. Signed by the claimant.", "Public liability insurance schedule relating to Elstvale Limited, dated 7 June 2026. 4 pages, complete.", "Incident report from the day relating to Elstvale Limited, dated 15 August 2026. 2 pages, complete. Signed by the duty manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 825}} {"id": "isc-te-00487-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Heskness & Co", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "11 August 2026"}, "checklist": ["If the tenant is a newly formed company, also include: signed parent company guarantee (signed)", "If the lease term is longer than seven years, also include: land registration application (signed)", "Check that the keys handover receipt is signed", "Check that the title information document is present", "Check that the signed draft lease is signed", "Check that the stamp duty return is signed", "Check that the asbestos survey report was issued within the last 12 months"], "submission": {"case": {"name": "premises PF-67086", "reference": "NG-35657", "details": ["The tenant is a newly formed company.", "The lease term is longer than seven years."]}, "cover note": "I am not certain that everything needed is included in the pack.", "documents received": ["Title_Information_Document_PF-67086.pdf - Title information document for premises PF-67086, dated 11 June 2026. 3 pages, complete.", "Asbestos_Survey_Report_PF-67086_20250828.pdf - Asbestos survey report for premises PF-67086, issued on 28 August 2025. 4 pages, complete.", "Stamp_Duty_Return_PF-67086.pdf - Stamp duty return for premises PF-67086, dated 15 April 2026. 2 pages, complete. Signed by the tenant's accountant.", "Signed_Draft_Lease_PF-67086.pdf - Signed draft lease for premises PF-67086, dated 10 June 2026. 12 pages, complete. Signed by the landlord and the tenant.", "File_011.pdf - The contents of this file cannot be seen, as the scan is blank.", "Guarantor_Consent_Letter_PF-67086.pdf - Guarantor consent letter for premises PF-67086, dated 4 June 2026. Single page. Signed by the guarantor.", "Land_Registration_Application_PF-67086.pdf - Land registration application for premises PF-67086, dated 17 June 2026. 2 pages, complete. Signed by the applicant's solicitor.", "Parent_Company_Guarantee_PF-67086.pdf - Signed parent company guarantee for premises PF-67086, dated 8 June 2026. 3 pages, complete. Signed by a director of the parent company.", "Keys_Handover_Receipt_PF-67086.pdf - Keys handover receipt for premises PF-67086, dated 12 June 2026. Single page. Signed by the landlord's agent."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 7, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1031}} {"id": "isc-te-00277-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Holham Ltd", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "16 April 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed.", "Payroll deduction agreement for recovery of the advance, signed.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Line manager approval for the advance, signed.", "Costed trip estimate sheet, issued within the last 3 months and signed.", "Travel policy extract showing advance eligibility."], "submission": {"case": {"name": "Xiu Yellisey", "reference": "OK-65774", "details": ["The requested advance is within the standard advance limit."]}, "documents received": ["Costed trip estimate sheet for Xiu Yellisey, dated 2 March 2026. Single page. Signed by the line manager.", "Travel policy extract showing advance eligibility for Xiu Yellisey, dated 27 December 2025. Single page.", "Payroll deduction agreement for recovery of the advance for Xiu Yellisey, dated 11 January 2026. Single page. Signed by the employee, Xiu Yellisey.", "Trip itinerary and approval for Xiu Yellisey, dated 29 November 2025. 2 pages, complete. Signed by the line manager.", "Line manager approval for the advance for Xiu Yellisey, dated 24 December 2025. Single page. Signed by the line manager.", "Trip itinerary and approval for Xiu Yellisey, dated 21 January 2026. 2 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 766}} {"id": "isc-te-00203-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Marlfell Limited", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "22 May 2026"}, "checklist": ["If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Photographs of the fault, issued within the last 3 months.", "Access authorisation slip, signed.", "Location details sheet.", "Parts order confirmation, issued within the last 1 months.", "Job request form, signed.", "Cost estimate, issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request WG-2235", "reference": "JG-32987", "details": ["The job involves no work at height above two metres."]}, "documents received": ["Access authorisation slip, maintenance request WG-2235. Date of issue: 1 May 2026. Single page. Signed by the site access controller.", "Job request form, maintenance request WG-2235. Date of issue: 30 April 2026. Single page. Signed by the requesting manager.", "Photographs of the fault, maintenance request WG-2235. Date of issue: 10 May 2026. 2 pages, complete.", "Location details sheet, maintenance request WG-2235. Date of issue: 29 April 2026. Single page.", "Parts order confirmation, maintenance request WG-2235. Date of issue: 13 May 2026. Single page.", "Cost estimate, maintenance request WG-2235. Date of issue: 29 April 2026. 2 pages, complete. Signed by the estimating supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 775}} {"id": "isc-te-00424-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ambside & Co", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "15 May 2026"}, "checklist": ["visa entry requirement printout, issued within the last 3 months", "flight itinerary quote, issued within the last 1 months", "line manager approval, signed", "If the trip involves travel to a country requiring a visa, also: visa approval letter", "trip cost estimate, signed", "passport copy for international travel, valid (not expired) on the date of the review"], "submission": {"case": {"name": "business trip QQ-26801", "reference": "UK-40834"}, "documents received": ["travel_request_form_QQ-26801.pdf. This is a travel request form for business trip QQ-26801, showing a date of issue of 27 March 2026. 2 pages, complete. It is signed by the employee.", "flight_itinerary_quote_QQ-26801.pdf. This is a flight itinerary quote for business trip QQ-26801, showing a date of issue of 1 May 2026. 2 pages, complete.", "passport_copy_QQ-26801.pdf. This is a passport copy for international travel for business trip QQ-26801, showing an expiry date of 19 September 2027. It is a single page.", "visa_entry_requirement_printout_QQ-26801.pdf. This is a visa entry requirement printout for business trip QQ-26801, showing a date of issue of 3 April 2026. 2 pages, complete.", "trip_cost_estimate_QQ-26801.pdf. This is a trip cost estimate for business trip QQ-26801, showing a date of issue of 6 April 2026. It is a single page, signed by the travel coordinator.", "line_manager_approval_QQ-26801.pdf. This is a line manager approval for business trip QQ-26801, showing a date of issue of 29 January 2026. It is a single page, signed by the line manager."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 684}} {"id": "isc-te-00016-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Jundburg Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "7 July 2026"}, "checklist": ["Payment confirmation, issued within the last 3 months.", "Prerequisite certificate.", "Venue access instructions, issued within the last 3 months.", "If the delegate requires an adjusted learning plan, also: learning support agreement, signed.", "Course booking form, signed.", "Cancellation policy acceptance, signed.", "Special requirements note."], "submission": {"case": {"name": "course booking MS-72228", "reference": "IX-67327", "details": ["The delegate requires an adjusted learning plan."]}, "cover note": "Please approve this pack for course booking MS-72228 as quickly as you can, as all the paperwork is in order.", "documents received": ["learning_support_agreement_19Mar2026.pdf: A learning support agreement about course booking MS-72228. It shows a date of issue of 19 March 2026, is a single page and bears the signature of the course administrator.", "course_booking_form_22Apr2026.pdf: A course booking form about course booking MS-72228. It shows a date of issue of 22 April 2026 and has 2 pages, complete. It bears the signature of the delegate.", "prerequisite_certificate_12Jun2026.pdf: A prerequisite certificate about course booking MS-72228. It shows a date of issue of 12 June 2026 and is a single page.", "special_requirements_note_17Mar2026.pdf: A special requirements note about course booking MS-72228. It shows a date of issue of 17 March 2026 and is a single page.", "venue_access_instructions_1May2026.pdf: Venue access instructions about course booking MS-72228. It shows a date of issue of 1 May 2026 and is a single page.", "employer_sponsorship_letter_16Jun2026.pdf: An employer sponsorship letter about course booking MS-72228. It shows a date of issue of 16 June 2026, is a single page and bears the signature of the employer's HR manager.", "cancellation_policy_acceptance_12Apr2026.pdf: A cancellation policy acceptance about course booking MS-72228. It shows a date of issue of 12 April 2026, is a single page and bears the signature of the delegate.", "screenshot_basket_17May2026.pdf: A screenshot of items left in an online basket about course booking MS-72228. It shows a date of issue of 17 May 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1016}} {"id": "isc-te-00297-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Kaldlock BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "21 July 2026"}, "checklist": ["Written grievance statement, signed", "Witness list, signed", "Adjustment request record, issued within the last 3 months, signed", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed", "Evidence bundle index, signed", "Grievance procedure acknowledgement, issued within the last 3 months, signed"], "submission": {"case": {"name": "Hannah Kerrmore", "reference": "SB-29513", "details": ["The grievance is against the employee's direct manager."]}, "documents received": ["Adjustment request record about Hannah Kerrmore. Dated 6 July 2026. Single page. Signed by the HR case handler.", "Written grievance statement about Hannah Kerrmore. Dated 26 April 2026. 3 pages, complete. Signed by the complaining employee, Hannah Kerrmore.", "Alternative manager reporting line note about Hannah Kerrmore. Dated 16 May 2026. Single page. Signed by the HR case handler.", "Witness list about Hannah Kerrmore. Dated 21 April 2026. Single page. Signed by the complaining employee, Hannah Kerrmore.", "Evidence bundle index about Hannah Kerrmore. Dated 9 July 2026. 2 pages, complete. Signed by the HR case handler.", "Grievance procedure acknowledgement about Hannah Kerrmore. Dated 9 April 2026. Single page. Signed by the complaining employee, Hannah Kerrmore."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 747}} {"id": "isc-te-00237-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Baxside Limited", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "16 March 2026"}, "checklist": ["Bank interest statement issued within the last 13 months", "Pension contribution certificate issued within the last 13 months", "Capital gains asset record", "If the household sold a property other than its main home during the tax year, also: property disposal calculation sheet, signed", "Tax return draft printout, signed", "Childcare payment receipt issued within the last 13 months"], "submission": {"case": {"name": "household tax affairs MV-6666", "reference": "AI-52954", "details": ["The household sold no property other than its main home during the tax year."]}, "documents received": ["capital-gains-asset-record-MV-6666.pdf - Capital gains asset record for household tax affairs MV-6666. Date of issue: 28 December 2025. 2 pages, complete.", "childcare-payment-receipt-MV-6666-undated.pdf - Childcare payment receipt for household tax affairs MV-6666. The date is smudged and cannot be read. Single page.", "pension-contribution-certificate-MV-6666.pdf - Pension contribution certificate for household tax affairs MV-6666. Date of issue: 26 January 2026. 2 pages, complete.", "bank-interest-statement-MV-6666.pdf - Bank interest statement for household tax affairs MV-6666. Date of issue: 25 January 2026. 3 pages, complete.", "tax-return-draft-printout-MV-6666.pdf - Tax return draft printout for household tax affairs MV-6666. Date of issue: 8 December 2025. 6 pages, complete. Signed by the filer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 813}} {"id": "isc-te-00433-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Yselburg Partners", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "1 April 2026"}, "checklist": ["Confirm the cost-benefit justification is included.", "Confirm the installation requirements note is included.", "Confirm the vendor quotation is included, issued within the last 3 months.", "Confirm the maintenance plan is included."], "submission": {"case": {"name": "equipment FH-21730", "reference": "QM-98274"}, "documents received": ["vendor quotation FH-21730.pdf — A vendor quotation for equipment FH-21730, dated 5 February 2026. 2 pages, complete.", "grant fund eligibility note FH-21730.pdf — A single-page grant fund eligibility note for equipment FH-21730, dated 12 December 2025. It is signed by the grants officer.", "cost-benefit justification FH-21730.pdf — A cost-benefit justification for equipment FH-21730, dated 21 December 2025. 3 pages, complete.", "installation requirements note FH-21730.pdf — An installation requirements note for equipment FH-21730, dated 17 February 2026. 2 pages, complete.", "maintenance plan FH-21730.pdf — A maintenance plan for equipment FH-21730, dated 7 March 2026. Pages 1-1 of 2 are included."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 721}} {"id": "isc-te-00437-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Faldcourt & Co", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "5 August 2026"}, "checklist": ["Complaint escalation form, issued within the last 1 month and signed", "Proposed resolution letter draft, signed", "Customer contact log, issued within the last 3 months", "Policy breach summary, issued within the last 3 months and signed", "Original complaint record, issued within the last 6 months"], "submission": {"case": {"name": "escalated complaint BO-70275", "reference": "JZ-82529"}, "cover note": "A colleague has already checked this pack, so it should be ready to go through.", "documents received": ["Policy breach summary for escalated complaint BO-70275, dated 13 June 2026. 2 pages, complete. Signed by the compliance officer.", "Store incident report for escalated complaint BO-70275, dated 17 July 2026. 2 pages, complete. Signed by the store manager.", "Customer contact log for escalated complaint BO-70275, dated 1 May 2026. 3 pages, complete.", "Original complaint record for escalated complaint BO-70275, dated 7 June 2026. 2 pages, complete.", "Proposed resolution letter draft for escalated complaint BO-70275, dated 25 April 2026. 2 pages, complete. Signed by the customer relations manager.", "Complaint escalation form for escalated complaint BO-70275, dated 15 July 2026. 2 pages, complete. Signed by the customer relations team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 767}} {"id": "isc-te-00372-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Neskwell Group", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "19 June 2026"}, "checklist": ["Board resolution to open the account, signed.", "Proof of registered office address, issued within the last 3 months.", "Company tax registration certificate.", "Beneficial owner identification form, signed."], "submission": {"case": {"name": "Garnshaw SAS", "reference": "NQ-87354"}, "cover note": "Sending this pack over to you. My colleague has already checked it.", "documents received": ["Proof_registered_office_11012026.pdf. Proof of registered office address for Garnshaw SAS, dated 11 January 2026. It is 1 page.", "Beneficial_owner_form_19052026.pdf. Beneficial owner identification form for Garnshaw SAS, dated 19 May 2026. It has 3 pages, complete, and is signed by a director.", "Tax_registration_certificate_19042026.pdf. Company tax registration certificate for Garnshaw SAS, dated 19 April 2026. It is 1 page.", "Board_resolution_11052026.pdf. Board resolution to open the account for Garnshaw SAS, dated 11 May 2026. It is 1 page and signed by the chairman of the board."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and say whether it is complete. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "variant-47", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 703}} {"id": "isc-te-00372-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Neskwell Group", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "19 June 2026"}, "checklist": ["Board resolution to open the account, signed.", "Proof of registered office address, issued within the last 3 months.", "Company tax registration certificate.", "Beneficial owner identification form, signed."], "submission": {"case": {"name": "Garnshaw SAS", "reference": "NQ-87354"}, "cover note": "Please have a look through this pack when you can. I am not sure everything needed is there.", "documents received": ["Beneficial_owner_form_19052026.pdf. Beneficial owner identification form for Garnshaw SAS, dated 19 May 2026. It has 3 pages, complete, and is signed by a director.", "Tax_registration_certificate_19042026.pdf. Company tax registration certificate for Garnshaw SAS, dated 19 April 2026. It is 1 page.", "Proof_registered_office_02042026.pdf. Proof of registered office address for Garnshaw SAS, dated 2 April 2026. It is 1 page.", "Board_resolution_11052026.pdf. Board resolution to open the account for Garnshaw SAS, dated 11 May 2026. It is 1 page and signed by the chairman of the board."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 698}} {"id": "isc-te-00087-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Lindcourt plc", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "3 April 2026"}, "checklist": ["Travel insurance quote issued within the last 1 months", "Special requests note, signed", "Passport details form, signed", "Booking request form, signed"], "submission": {"case": {"name": "holiday booking NN-90265", "reference": "KO-80548"}, "documents received": ["Travel insurance quote for holiday booking NN-90265, dated 25 April 2024. 2 pages, complete.", "Passport details form for holiday booking NN-90265, dated 23 February 2026. Single page, signed by the customer.", "Booking request form for holiday booking NN-90265, dated 6 February 2026. 2 pages, complete. Signed by the reservations clerk.", "Flight availability printout for holiday booking NN-90265, dated 24 March 2026. 2 pages, complete.", "Special requests note for holiday booking NN-90265, dated 13 December 2025. Single page, signed by the customer.", "Travel insurance quote for holiday booking NN-90265, dated 13 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 691}} {"id": "isc-te-00068-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Halvby LLP", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "6 April 2026"}, "checklist": ["Safeguarding referral form, issued within the last 12 months, signed", "Needs assessment report, signed", "Support plan, signed", "Financial assessment form, signed", "Recent bank statements, issued within the last 3 months", "Proof of identity, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Vikram Nebbberg", "reference": "VI-15919"}, "cover note": "Please could you approve this pack as soon as possible, as all the paperwork is in order. Many thanks, Chiara Gadberg", "documents received": ["Support plan for Vikram Nebbberg. Date of issue: 26 January 2026. 6 pages, complete. Signed by the care coordinator.", "Financial assessment form for Vikram Nebbberg. Date of issue: 3 January 2026. 6 pages, complete. Signed by the financial assessment officer.", "Proof of identity for Vikram Nebbberg. Expiry date: 31 October 2027. Single page.", "Capacity assessment record for Vikram Nebbberg. Date of issue: 23 January 2026. 4 pages, complete. Signed by the social worker.", "Needs assessment report for Vikram Nebbberg. Date of issue: 4 February 2026. 12 pages, complete. Signed by the lead assessor.", "Recent bank statements for Vikram Nebbberg. Date of issue: 15 February 2026. 8 pages, complete.", "Safeguarding referral form for Vikram Nebbberg. Date of issue: 22 December 2025. 2 pages, complete. The area of the page where a signature would appear is covered by a sticky note, so it is not known whether the form is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 824}} {"id": "isc-te-00065-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Xanton LLP", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "29 June 2026"}, "checklist": ["Recent bank statements issued within the last 3 months.", "Capacity assessment record, signed.", "Benefit entitlement letters issued within the last 12 months.", "Support plan, signed."], "submission": {"case": {"name": "Jack Knoxaker", "reference": "YE-59569"}, "documents received": ["Support plan. Support plan for Jack Knoxaker, issued on 4 May 2026. 6 pages, complete. Signed by the lead social worker.", "Benefit entitlement letters. Benefit entitlement letters for Jack Knoxaker, issued on 27 October 2025. 2 pages, complete.", "Bank statements. Recent bank statements for Jack Knoxaker, issued on 23 April 2026. 8 pages, complete.", "Financial assessment form. Financial assessment form for Jack Knoxaker, issued on 16 May 2026. 6 pages, complete. Signed by the adult, Jack Knoxaker."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 629}} {"id": "isc-te-00205-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Larvwick GmbH", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "23 July 2026"}, "checklist": ["Line manager opinion note, issued within the last 2 months and signed", "Impact assessment on the team, signed", "Previous flexible working requests record, issued within the last 24 months", "Current working pattern statement, issued within the last 3 months", "Flexible working request form, signed"], "submission": {"case": {"name": "Lena Lovsall", "reference": "IC-55479"}, "documents received": ["impact_assessment_on_the_team.pdf. An impact assessment on the team about Lena Lovsall, dated 8 May 2026. 3 pages, complete. It is signed by the line manager.", "flexible_working_request_form.pdf. A flexible working request form about Lena Lovsall, dated 21 April 2026. 3 pages, complete. It is signed by Lena Lovsall.", "line_manager_opinion_note.pdf. A line manager opinion note about Lena Lovsall, dated 16 June 2026. 2 pages, complete. It is signed by the line manager.", "current_working_pattern_statement.pdf. A current working pattern statement about Lena Lovsall, dated 6 May 2026. It is a single page.", "previous_flexible_working_requests_record.pdf. A previous flexible working requests record about Lena Lovsall, dated 13 July 2025. It is a single page.", "proposed_working_pattern_plan.pdf. A proposed working pattern plan about Lena Lovsall, dated 24 May 2026. 2 pages, complete. It is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 762}} {"id": "isc-te-00231-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Gravwick Ltd", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "15 June 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "If the account will post content about financial products, also: financial promotions approval note, issued within the last 3 months, signed", "Two-factor authentication confirmation, issued within the last 3 months", "Content escalation route, signed", "Account request form, signed", "If the account will be run by an external agency, also: agency access agreement, signed", "Account closure procedure"], "submission": {"case": {"name": "new social media account DW-36887", "reference": "VT-29997", "details": ["The account will not post any content about financial products.", "The account will be run by an external agency."]}, "documents received": ["A single-page content escalation route for new social media account DW-36887, dated 5 March 2026. It is signed by the social media governance team lead.", "A single-page social media policy acknowledgement for new social media account DW-36887, dated 22 May 2026. It is signed by the account owner.", "A single-page account request form for new social media account DW-36887, dated 22 May 2026. It is signed by the marketing manager.", "A single-page account purpose statement for new social media account DW-36887, dated 28 March 2026.", "An agency access agreement for new social media account DW-36887, dated 9 May 2026. It is 2 pages, complete, and signed by the external agency's account director.", "A single-page account closure procedure for new social media account DW-36887, dated 28 May 2026.", "A single-page admin access list for new social media account DW-36887, dated 12 June 2026.", "A single-page two-factor authentication confirmation for new social media account DW-36887, dated 26 March 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00358-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Kestlock Ltd", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "4 August 2026"}, "checklist": ["Check that the expense claim form is signed.", "Check that the train ticket receipt is present.", "Check that the currency conversion statement was issued within the last 6 months.", "If the claim includes mileage for use of a private car, also check that the mileage log is signed.", "Check that the boarding pass stub is present.", "Check that the taxi fare receipt was issued within the last 6 months."], "submission": {"case": {"name": "Emre Tibins", "reference": "QF-77856", "details": ["The claim includes no private car mileage."]}, "documents received": ["currency_conversion_statement_QF-77856.pdf — Currency conversion statement about Emre Tibins, dated 30 June 2026. It is a single page.", "expense_claim_form_partial_QF-77856.pdf — Expense claim form about Emre Tibins, dated 4 June 2026. Pages 1 to 1 are included, and the total number of pages is not shown anywhere. Signed by the claiming employee.", "conference_fee_invoice_QF-77856.pdf — Conference fee invoice about Emre Tibins, dated 19 March 2026. It is a single page.", "taxi_fare_receipt_QF-77856.pdf — Taxi fare receipt about Emre Tibins, dated 8 July 2026. It is a single page.", "boarding_pass_stub_QF-77856.pdf — Boarding pass stub about Emre Tibins, dated 7 April 2026. It is a single page.", "train_ticket_receipt_QF-77856.pdf — Train ticket receipt about Emre Tibins, dated 28 July 2026. It is a single page.", "restaurant_receipt_QF-77856.pdf — Restaurant receipt about Emre Tibins, dated 25 June 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00091-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Stervside plc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "3 August 2026"}, "checklist": ["Shared mailbox handover record, issued within the last 1 months and signed", "Leaver notification form, signed", "Service desk ticket closure summary, issued within the last 1 months", "Access rights inventory, issued within the last 1 months", "Non-disclosure reminder acknowledgement, signed"], "submission": {"case": {"name": "Siobhan Foskthwaite", "reference": "HW-35438"}, "documents received": ["shared_mailbox_handover_record_HW-35438.pdf — Shared mailbox handover record for Siobhan Foskthwaite. Dated 20 July 2026. 2 pages, complete, signed by the departing employee.", "access_rights_inventory_Carmen_Orvsen.pdf — Access rights inventory for Carmen Orvsen. Dated 20 July 2026. 4 pages, complete.", "leaver_notification_form_HW-35438.pdf — Leaver notification form for Siobhan Foskthwaite. Dated 27 April 2026. 2 pages, complete, signed by the line manager.", "equipment_return_receipt_HW-35438.pdf — Equipment return receipt for Siobhan Foskthwaite. Dated 15 July 2026. Single page, signed by the IT asset officer.", "service_desk_ticket_closure_summary_HW-35438.pdf — Service desk ticket closure summary for Siobhan Foskthwaite. Dated 22 July 2026. 3 pages, complete.", "non_disclosure_reminder_acknowledgement_HW-35438.pdf — Non-disclosure reminder acknowledgement for Siobhan Foskthwaite. Dated 9 July 2026. Single page, signed by the departing employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 816}} {"id": "isc-te-00012-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Wendhaven Inc", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "27 July 2026"}, "checklist": ["Photo identification, valid (not expired) on the date of the review: present", "Fraud questionnaire, signed: present", "Signature verification record, signed: present", "Card replacement request form, signed: present", "Delivery address confirmation, signed: present", "Confirmation of contact details, issued within the last 3 months: present"], "submission": {"case": {"name": "Lin Yellmore", "reference": "BW-71574"}, "documents received": ["Fraud questionnaire - Lin Yellmore.pdf — Fraud questionnaire for Lin Yellmore, dated 6 July 2026. 2 pages, complete. It is signed by the cardholder.", "Signature verification record - Lin Yellmore.pdf — Signature verification record for Lin Yellmore, dated 26 April 2026, single page. It is signed by the bank officer who carried out the verification.", "Delivery address confirmation - Lin Yellmore.pdf — Delivery address confirmation for Lin Yellmore, dated 24 May 2026, single page. It is signed by the cardholder.", "Card replacement request form - Lin Yellmore.pdf — Card replacement request form for Lin Yellmore, dated 23 April 2026. 2 pages, complete. It is signed by the cardholder.", "Confirmation of contact details - Lin Yellmore.pdf — Confirmation of contact details for Lin Yellmore, dated 4 July 2026, single page.", "Photo identification - Lin Yellmore.pdf — Photo identification for Lin Yellmore, single page. It shows an expiry date of 16 August 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 770}} {"id": "isc-te-00473-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Uldberg Partners", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "21 May 2026"}, "checklist": ["Planned completion date sheet, signed.", "Access authorisation slip, signed.", "If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Parts order confirmation, issued within the last 1 months.", "Photographs of the fault, issued within the last 3 months.", "Job request form, signed."], "submission": {"case": {"name": "maintenance request NO-34425", "reference": "UR-51642", "details": ["The job involves working at height above two metres."]}, "documents received": ["Job request form for maintenance request NO-34425. Dated 3 February 2026. 1 page. The signature line is empty; the form is not signed.", "Risk assessment for the task under maintenance request NO-34425. Dated 19 March 2026. 5 pages, complete. Signed by the assessing duty manager.", "Permit to work at height for maintenance request NO-34425. Dated 1 May 2026. 1 page. Signed by the issuing supervisor.", "Location details sheet for maintenance request NO-34425. Dated 29 March 2026. 1 page.", "Access authorisation slip for maintenance request NO-34425. Dated 9 May 2026. 1 page. Signed by the site access coordinator.", "Photographs of the fault for maintenance request NO-34425. Dated 24 March 2026. 2 pages, complete.", "Parts order confirmation for maintenance request NO-34425. Dated 5 May 2026. 1 page.", "Planned completion date sheet for maintenance request NO-34425. Dated 21 February 2026. 1 page. Signed by the facilities manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 848}} {"id": "isc-te-00356-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Orrford SAS", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "31 March 2026"}, "checklist": ["Booking voucher, issued within the last 6 months.", "Driving licence, valid (not expired) on the date of the review, signed.", "Fuel policy sheet, signed.", "Credit card in the driver's name, valid (not expired) on the date of the review, signed.", "Insurance excess waiver certificate, valid (not expired) on the date of the review."], "submission": {"case": {"name": "Zofia Ingova", "reference": "SN-55445"}, "documents received": ["Passport for Zofia Ingova, expiring 12 July 2027. One page. Signed by the passport holder.", "Prepaid gift card bought from a shop for Zofia Ingova, expiring 14 September 2028. One page. Signed by the cardholder.", "Booking voucher for Zofia Ingova, dated 23 November 2025. One page.", "Driving licence for Zofia Ingova, expiring 16 May 2027. 2 pages, complete. Signed by the licence holder.", "Fuel policy sheet for Zofia Ingova, dated 28 January 2026. One page. Signed by the driver.", "Insurance excess waiver certificate for Zofia Ingova, expiring 26 October 2027. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 716}} {"id": "isc-te-00421-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Briskcliff LLP", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "3 June 2026"}, "checklist": ["Travel policy acknowledgement, signed.", "Line manager approval, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Trip cost estimate, signed.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Travel request form, signed."], "submission": {"case": {"name": "business trip WR-16880", "reference": "LV-18491", "details": ["The trip involves no country requiring a visa."]}, "documents received": ["Line manager approval for business trip WR-16880, issued 16 March 2026. Single page. Signed by the line manager.", "Document 0911.pdf. The file will not open, so its contents cannot be seen.", "Visa entry requirement printout for business trip WR-16880, issued 25 March 2026. 2 pages, complete.", "Passport copy for international travel for business trip WR-16880. Expiry date 27 August 2027. Single page.", "Hotel booking confirmation for business trip WR-16880, issued 15 March 2026. 2 pages, complete.", "Trip cost estimate for business trip WR-16880, issued 29 April 2026. Single page. Signed by the employee.", "Travel policy acknowledgement for business trip WR-16880, issued 2 May 2026. Single page. Signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 759}} {"id": "isc-te-00461-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Kenvwell & Co", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "4 March 2026"}, "checklist": ["Property valuation report, issued within the last 6 months and signed.", "Employment certificate, issued within the last 1 months and signed.", "Photo identity document, valid (not expired) on the date of the review.", "Sale and purchase agreement, signed.", "If the property is a new build, also: new build warranty certificate.", "Proof of deposit, issued within the last 3 months."], "submission": {"case": {"name": "property BG-8952", "reference": "YY-95642", "details": ["The property is a new build."]}, "documents received": ["Neighbourhood guide with average house prices for property BG-8952, dated 8 November 2025. 10 pages, complete. The guide is signed by the compiler.", "Bank statement for property BG-8952, dated 10 January 2026. 3 pages, complete.", "Employment certificate for property BG-8952, dated 18 February 2026. Single page. The certificate is signed by the employer.", "New build warranty certificate for property BG-8952, dated 1 December 2025. 3 pages, complete.", "Sale and purchase agreement for property BG-8952, dated 22 December 2025. 9 pages, complete. The agreement is signed by the buyer and the seller.", "Proof of deposit for property BG-8952, dated 1 March 2026. Single page.", "Property valuation report for property BG-8952, dated 8 November 2025. 10 pages, complete. The report is signed by the surveyor.", "Photo identity document for property BG-8952, showing an expiry date of 15 October 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 822}} {"id": "isc-te-00077-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Elstham SAS", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "17 July 2026"}, "checklist": ["Payment gateway technical specification for the gateway, on file.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review.", "Test environment transaction log, issued within the last 1 months.", "Data protection impact assessment, issued within the last 12 months, signed.", "Gateway integration request form, signed."], "submission": {"case": {"name": "payment gateway FY-30649", "reference": "NK-85955", "details": ["The gateway will not store customers' card details."]}, "cover note": "Everything needed is attached and complete.", "documents received": ["Test environment transaction log for payment gateway FY-30649, dated 4 June 2026. 4 pages, complete.", "Gateway integration request form for payment gateway FY-30649, dated 9 April 2026, signed by the requesting manager. 2 pages, complete.", "Data protection impact assessment for payment gateway FY-30649, dated 12 October 2025, signed by the Data Protection Officer. 5 pages, complete.", "Payment gateway technical specification for payment gateway FY-30649, dated 28 March 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 709}} {"id": "isc-te-00290-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Raskmore plc", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "17 March 2026"}, "checklist": ["Photographs of the fault, issued within the last 3 months", "Cost estimate, issued within the last 3 months, signed", "Job request form, signed", "Planned completion date sheet, signed", "Location details sheet"], "submission": {"case": {"name": "maintenance request IW-1228", "reference": "EG-89517"}, "documents received": ["Cost estimate. The estimate concerns maintenance request IW-1228 and shows a date of issue of 22 February 2026. 2 pages, complete. It is signed by the estimator.", "Job request form. The form concerns maintenance request IW-1228 and shows a date of issue of 13 February 2026. 1 page. It is signed by the requesting manager.", "Planned completion date sheet. The sheet concerns maintenance request IW-1228 and shows a date of issue of 23 December 2025. 1 page. It is signed by the facilities coordinator.", "Access authorisation slip. The slip concerns maintenance request IW-1228 and shows a date of issue of 31 December 2025. 1 page. It is signed by the site security officer.", "Photographs of the fault. The photographs concern maintenance request IW-1228 and show a date of issue of 2 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 726}} {"id": "isc-te-00317-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Brenwyn Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "20 August 2026"}, "checklist": ["Obtain a financial stability statement, issued within the last 12 months and signed.", "Obtain a raw material certificate of analysis, issued within the last 6 months and signed.", "Obtain a supplier self-assessment report, issued within the last 12 months and signed.", "Obtain a supplier audit report, issued within the last 24 months and signed.", "Obtain a supplier capacity declaration, issued within the last 12 months and signed.", "Obtain a supplier quality questionnaire, issued within the last 12 months and signed."], "submission": {"case": {"name": "Haskbury BV", "reference": "CB-19498"}, "documents received": ["Haskbury_BV_QMS_Certificate.pdf - Certified quality management system certificate for Haskbury BV, expiring 29 June 2028. Single page.", "Haskbury_BV_Self_Assessment_Report.pdf - Supplier self-assessment report for Haskbury BV, dated 3 August 2026. 6 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Corrective_Action_Plan.pdf - Supplier corrective action plan for Haskbury BV, dated 9 April 2026. 3 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Capacity_Declaration.pdf - Supplier capacity declaration for Haskbury BV, dated 18 September 2025. 2 pages, complete. Signed by the supplier's operations director.", "Haskbury_BV_Raw_Material_CoA.pdf - Raw material certificate of analysis for Haskbury BV, dated 8 April 2026. 2 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Financial_Stability_Statement.pdf - Financial stability statement for Haskbury BV, dated 21 May 2026. 2 pages, complete. Signed by the chief financial officer of Haskbury BV.", "Haskbury_BV_Quality_Questionnaire.pdf - Supplier quality questionnaire for Haskbury BV, dated 2 October 2025. 4 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Supplier_Audit_Report_September_2024.pdf - Supplier audit report for Haskbury BV, dated 6 September 2024. 8 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 949}} {"id": "isc-te-00355-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Baxmere Limited", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "4 August 2026"}, "checklist": ["Vehicle condition report, signed", "Driving licence, valid (not expired) on the date of the review, signed", "Passport, valid (not expired) on the date of the review, signed", "Credit card in the driver's name, valid (not expired) on the date of the review, signed"], "submission": {"case": {"name": "Orla Fitzard", "reference": "GK-82009"}, "documents received": ["A scanned passport in the name of Orla Fitzard, showing an expiry date of 14 November 2027. Single page. The passport is signed by the bearer.", "A scanned credit card in the driver's name of Orla Fitzard, showing an expiry date of 9 February 2027. Single page. The card is signed by the cardholder.", "A scanned driving licence in the name of Orla Fitzard, showing an expiry date of 3 May 2028. 2 pages, complete. The licence is signed by the licence holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 643}} {"id": "isc-te-00201-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Cindwell & Co", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "16 September 2026"}, "checklist": ["Engineer's service report, issued within the last 1 month, signed", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "Refrigerant top-up log, issued within the last 1 month, signed", "Plant room access sign-in sheet", "F-gas leak check record, issued within the last 12 months, signed", "Asset condition photograph sheet, issued within the last 1 month", "If refrigerant was added during the service, also: refrigerant recovery note, issued within the last 1 month, signed"], "submission": {"case": {"name": "air conditioning system YE-45954", "reference": "YI-92981", "details": ["Refrigerant was added during the service."]}, "documents received": ["Refrigerant recovery note for air conditioning system YE-45954, dated 26 August 2026. Single page. Signed by the service engineer.", "F-gas leak check record for air conditioning system YE-45954, dated 18 June 2026. 2 pages, complete. Signed by the leak check engineer.", "Engineer F-gas handling certificate for air conditioning system YE-45954, with expiry date 12 July 2028. Single page.", "Plant room access sign-in sheet for air conditioning system YE-45954, dated 22 July 2026. Single page.", "Electrical safety certificate for the engineer, covering air conditioning system YE-45954, with expiry date 12 July 2028. Single page.", "Asset condition photograph sheet for air conditioning system YE-45954, dated 2 September 2026. 2 pages, complete.", "Refrigerant top-up log for air conditioning system YE-45954, dated 11 September 2026. Single page. Signed by the service engineer.", "System pressure test results for air conditioning system YE-45954, dated 26 August 2026. 2 pages, complete. Signed by the test engineer.", "Engineer's service report for air conditioning system YE-45954, dated 13 September 2026. 3 pages, complete. Signed by the service engineer."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The verdict complete: every applicable line is met (extra documents do not matter). The verdict incomplete: at least one applicable line is not met. The verdict unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "variant-21", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 954}} {"id": "isc-te-00017-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Yondgate Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "19 August 2026"}, "checklist": ["Check that the pack contains a prerequisite certificate.", "Check that the pack contains venue access instructions issued within the last 3 months.", "Check that the pack contains an employer sponsorship letter issued within the last 3 months and signed.", "Check that the pack contains payment confirmation issued within the last 3 months."], "submission": {"case": {"name": "course booking CC-42557", "reference": "LU-53975"}, "documents received": ["payment_confirmation_CC-42557_20260731.pdf. Payment confirmation for course booking CC-42557. It shows its date of issue as 31 July 2026 and is a single page.", "delegate_photo_identification_CC-42557.pdf. Delegate photo identification for course booking CC-42557. It shows its expiry date as 6 June 2028 and is a single page.", "employer_sponsorship_letter_CC-42557_20260630.pdf. Employer sponsorship letter for course booking CC-42557. It shows its date of issue as 30 June 2026 and is a single page. It is signed by the employer's authorising signatory.", "special_requirements_note_CC-42557_20260519.pdf. Special requirements note for course booking CC-42557. It shows its date of issue as 19 May 2026 and is a single page.", "venue_access_instructions_CC-42557_undated.pdf. Venue access instructions for course booking CC-42557. The date of issue is smudged and cannot be read. It is a single page.", "prerequisite_certificate_CC-42557.pdf. Prerequisite certificate for course booking CC-42557. It shows its date of issue as 9 August 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "expired", "defect": "date not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 848}} {"id": "isc-te-00102-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Elvcrest Ltd", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "7 May 2026"}, "checklist": ["Proof of registered office address, issued within the last 3 months", "Authorised signer identity document, valid (not expired) on the date of the review", "Board resolution to open the account, signed", "Beneficial owner identification form, signed", "Company tax registration certificate", "Certificate of incorporation"], "submission": {"case": {"name": "Pentlund GmbH", "reference": "WW-71385"}, "cover note": "This pack has already been checked by a colleague, so it should be ready for your review.", "documents received": ["Authorised signer identity document for Pentlund GmbH. Expiry date: 17 November 2025. Single page.", "Beneficial owner identification form for Pentlund GmbH. Date of issue: 17 January 2026. 3 pages, complete. Signed by the authorised signer.", "Company tax registration certificate for Pentlund GmbH. Date of issue: 29 April 2026. Single page.", "Proof of registered office address for Pentlund GmbH. Date of issue: 25 March 2026. Single page.", "Company statutes for Pentlund GmbH. Date of issue: 12 January 2026. 12 pages, complete. Signed by the managing director.", "Certificate of incorporation for Pentlund GmbH. Date of issue: 2 March 2026. Single page.", "Board resolution to open the account for Pentlund GmbH. Date of issue: 6 February 2026. Signed by the chair of the board. Single page."]}}, "question": {"type": "choice", "instructions": "Your task is to decide whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "expired before the review", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-40", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 758}} {"id": "isc-te-00196-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Ivrhaven Limited", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "3 August 2026"}, "checklist": ["Customer order history extract, issued within the last 6 months", "If the customer claims the item was not as described, also: product description screenshot archive, issued within the last 6 months", "Signature proof of delivery, issued within the last 6 months, signed", "Transaction record printout, issued within the last 3 months", "Customer account details page, issued within the last 3 months", "Terms of sale acceptance log, issued within the last 12 months"], "submission": {"case": {"name": "disputed transaction DD-99864", "reference": "FL-51485", "details": ["The customer claims the item was not as described."]}, "documents received": ["Terms of sale acceptance log for disputed transaction DD-99864. Date of issue: 5 June 2026. Single page.", "Customer order history extract for disputed transaction DD-99864. Date of issue: 5 July 2026. 2 pages, complete.", "Product description screenshot archive for disputed transaction DD-99864. Date of issue: 31 July 2026. 2 pages, complete.", "Signature proof of delivery for disputed transaction DD-99864. Date of issue: 19 March 2026. Single page. Signed by the delivery driver.", "Customer account details page for disputed transaction DD-99864. Date of issue: 18 June 2026. Single page.", "Transaction record printout for disputed transaction DD-99864. Date of issue: 12 June 2026. Single page.", "Social media profile page for disputed transaction DD-99864. Date of issue: 18 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "The decision to make is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves, not the notes.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-43", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 819}} {"id": "isc-te-00119-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Prydcourt Ltd", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "13 August 2026"}, "checklist": ["Confirm the trial period proposal is included and signed.", "If the employee has caring responsibilities for a dependent, also check for a caring responsibilities statement and confirm it is signed.", "Confirm the client or service impact statement is included and signed.", "Confirm the impact assessment on the team is included and signed.", "Confirm the line manager opinion note is signed and was issued within the last 2 months.", "Confirm the current working pattern statement is issued within the last 3 months.", "Confirm the proposed working pattern plan is included and signed."], "submission": {"case": {"name": "Thiago Lamingham", "reference": "TJ-66574"}, "documents received": ["impact assessment on the team – Thiago Lamingham, issued 9 May 2026. 3 pages, complete, signed by the line manager.", "previous flexible working requests record – Thiago Lamingham, issued 19 October 2024. A single page.", "trial period proposal – Thiago Lamingham, issued 1 July 2026. A single page, signed by the line manager.", "caring responsibilities statement – Thiago Lamingham, issued 8 June 2026. A single page, signed by Thiago Lamingham.", "client or service impact statement – Thiago Lamingham, issued 27 June 2026. A single page, signed by the line manager.", "proposed working pattern plan – Thiago Lamingham, issued 4 July 2026. 2 pages, complete, signed by the line manager.", "current working pattern statement – Thiago Lamingham, issued 17 June 2026. A single page.", "line manager opinion note – Thiago Lamingham, issued 5 July 2026. 2 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00418-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Kestside Partners", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "1 July 2026"}, "checklist": ["Passport for Xiu Jessby, valid (not expired) on the date of the review, 1 July 2026.", "Three months of bank statements, issued within the last 3 months.", "Proof of deposit savings, issued within the last 3 months.", "Mortgage application form, issued within the last 3 months, signed."], "submission": {"case": {"name": "Xiu Jessby", "reference": "MR-93438"}, "documents received": ["Property valuation report for Xiu Jessby, dated 22 June 2026, signed by the valuer. 8 pages, complete.", "Mortgage application form for Xiu Jessby, dated 17 May 2026, signed by the borrower. 10 pages, complete.", "Passport for Xiu Jessby, with expiry date 15 February 2027. 2 pages, complete.", "Gifted deposit letter for Xiu Jessby, dated 18 June 2026, signed by the giftor. Single page.", "Three months of bank statements for Xiu Jessby, dated 20 May 2026. 9 pages, complete.", "Proof of deposit savings for Xiu Jessby, dated 24 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 706}} {"id": "isc-te-00025-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Dravside Group", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "16 September 2026"}, "checklist": ["Previous grievance outcome letter, issued within the last 24 months.", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed.", "Witness list, signed.", "Evidence bundle index, signed.", "Investigator appointment letter, issued within the last 3 months."], "submission": {"case": {"name": "Carmen Daskow", "reference": "VR-41263", "details": ["The grievance is not against the employee's direct manager."]}, "documents received": ["VR-41263 witness list - Carmen Daskow.pdf. Witness list about Carmen Daskow, dated 3 July 2026. A single page, signed by the case handler.", "VR-41263 evidence bundle index - Carmen Daskow.pdf. Evidence bundle index about Carmen Daskow, dated 3 September 2026. 2 pages, complete, signed by the case handler.", "VR-41263 previous grievance outcome letter - Carmen Daskow.pdf. Previous grievance outcome letter about Carmen Daskow, dated 16 January 2025. 2 pages, complete.", "VR-41263 investigator appointment letter - Carmen Daskow.pdf. Investigator appointment letter about Carmen Daskow, dated 12 July 2026. A single page.", "VR-41263 grievance procedure acknowledgement - Carmen Daskow.pdf. Grievance procedure acknowledgement about Carmen Daskow, dated 4 August 2026. A single page, signed by the case handler."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 770}} {"id": "isc-te-00026-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Delvston & Co", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "17 August 2026"}, "checklist": ["Current working pattern statement, issued within the last 3 months.", "Flexible working request form, signed.", "Proposed working pattern plan, signed.", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed.", "Trial period proposal, signed.", "Client or service impact statement, signed."], "submission": {"case": {"name": "Hannah Kipock", "reference": "CM-83789", "details": ["The employee has caring responsibilities for a dependent."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["Proposed working pattern plan, Hannah Kipock. Date of issue: 22 July 2026. 2 pages, complete. Signed by the employee, Hannah Kipock.", "Current working pattern statement, Hannah Kipock. Date of issue: 16 July 2026. 1 page.", "Impact assessment on the team, Hannah Kipock. Date of issue: 10 June 2026. 3 pages, complete. Signed by the line manager.", "Flexible working request form, Hannah Kipock. Date of issue: 29 May 2026. 3 pages, complete. Signed by the employee, Hannah Kipock.", "Line manager opinion note, Hannah Kipock. Date of issue: 3 July 2026. 2 pages, complete. Signed by the line manager.", "Client or service impact statement, Hannah Kipock. Date of issue: 25 June 2026. 1 page. Signed by the line manager.", "Trial period proposal, Hannah Kipock. Date of issue: 23 June 2026. 1 page. Signed by the line manager.", "Caring responsibilities statement, Hannah Kipock. Date of issue: 16 May 2026. 1 page. Signed by the employee, Hannah Kipock.", "Customer complaint letter about something else, Hannah Kipock. Date of issue: 25 June 2026. 1 page. Signed by the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 879}} {"id": "isc-te-00115-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Prydwyn LLP", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "7 April 2026"}, "checklist": ["Previous grievance outcome letter, issued within the last 24 months", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed", "Meeting invitation with rights explained, issued within the last 1 months", "Adjustment request record, issued within the last 3 months, signed", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed", "Witness list, signed", "Investigator appointment letter, issued within the last 3 months", "Grievance procedure acknowledgement, issued within the last 3 months, signed"], "submission": {"case": {"name": "Helen Zellcombe", "reference": "JL-16752", "details": ["The grievance makes no allegation of bullying.", "The grievance is against the employee's direct manager."]}, "documents received": ["Adjustment request record concerning Helen Zellcombe, dated 10 March 2026. 1 page. Signed by the employee.", "Witness list concerning Helen Zellcombe, dated 1 April 2026. 1 page. Signed by the case handler.", "Meeting invitation with rights explained concerning Helen Zellcombe, dated 5 April 2026. 1 page.", "Investigator appointment letter concerning Helen Zellcombe, dated 2 April 2026. 1 page.", "Grievance procedure acknowledgement concerning Helen Zellcombe, dated 17 February 2026. 1 page. Signed by the employee.", "Evidence bundle index concerning Helen Zellcombe, dated 14 March 2026. 2 pages, complete. Signed by the case handler.", "Alternative manager reporting line note concerning Helen Zellcombe, dated 28 December 2025. 1 page. Signed by the alternative manager.", "Previous grievance outcome letter concerning Helen Zellcombe, dated 19 December 2024. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00425-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Zervstead plc", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "7 April 2026"}, "checklist": ["Support plan, signed", "Proof of identity, valid (not expired) on the date of the review", "Needs assessment report, signed", "Safeguarding referral form, issued within the last 12 months, signed", "If the adult owns property that could be considered in the financial assessment, also: property valuation report, issued within the last 12 months, signed", "Benefit entitlement letters, issued within the last 12 months"], "submission": {"case": {"name": "Emre Brodett", "reference": "QM-52065", "details": ["The adult does not own property that could be considered in the financial assessment."]}, "documents received": ["Safeguarding referral form - Emre Brodett. The form is dated 16 November 2025. 2 pages, complete. It is signed by the safeguarding lead.", "Benefit entitlement letters - Emre Brodett. The letters are dated 22 November 2025. 2 pages, complete.", "Needs assessment report - Emre Brodett. The report is dated 27 January 2026. 12 pages, complete. It is signed by the assessing social worker.", "Proof of identity - Emre Brodett. The document shows an expiry date of 21 September 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete: every applicable line is met (extra documents do not matter). Reply incomplete: at least one applicable line is not met. Reply unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-15", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 732}} {"id": "isc-te-00485-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskstead GmbH", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "28 August 2026"}, "checklist": ["Confirm the pack contains the signed draft lease, signed.", "Confirm the pack contains the title information document.", "Confirm the pack contains the energy performance certificate, valid (not expired) on the date of the review.", "Confirm the pack contains the keys handover receipt, signed.", "Confirm the pack contains the stamp duty return, signed.", "If the lease term is longer than seven years, also: land registration application, signed."], "submission": {"case": {"name": "premises MU-15688", "reference": "AJ-54933", "details": ["The lease term is longer than seven years."]}, "documents received": ["Stamp duty return. Premises MU-15688. Date of issue: 12 June 2026. 2 pages, complete. Signed by the tenant.", "Company search report. Premises MU-15688. Date of issue: 10 August 2026. 2 pages, complete.", "Title information document. Premises MU-15688. Date of issue: 10 August 2026. 3 pages, complete.", "Asbestos survey report. Premises MU-15688. Date of issue: 19 September 2025. 4 pages, complete.", "Land registration application. Premises MU-15688. Date of issue: 21 May 2026. 2 pages, complete. Signed by the landlord.", "Energy performance certificate. Premises MU-15688. Expiry date: 15 December 2026. Single page.", "Keys handover receipt. Premises MU-15688. Date of issue: 2 June 2026. Single page. Signed by the tenant.", "Signed draft lease. Premises MU-15688. Date of issue: 6 May 2026. 12 pages, complete. Signed by the landlord and the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 853}} {"id": "isc-te-00204-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Faldfeld LLP", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "8 May 2026"}, "checklist": ["Refrigerant top-up log, issued within the last 1 month and signed", "Plant room access sign-in sheet", "System pressure test results, issued within the last 1 month and signed", "F-gas leak check record, issued within the last 12 months and signed", "If refrigerant was added during the service, also: refrigerant recovery note, issued within the last 1 month and signed", "Engineer F-gas handling certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "air conditioning system FW-33470", "reference": "JE-34942", "details": ["Refrigerant was added during the service."]}, "cover note": "Could you approve this pack as quickly as possible? All the paperwork is in order.", "documents received": ["Asset condition photograph sheet for air conditioning system FW-33470, issued 27 April 2026, 2 pages, complete.", "System pressure test results for air conditioning system FW-33470, issued 19 April 2026, 2 pages, complete. It is signed by the servicing engineer.", "Engineer F-gas handling certificate for air conditioning system FW-33470, showing an expiry date of 12 January 2028, 1 page.", "Plant room access sign-in sheet for air conditioning system FW-33470, issued 4 April 2026, 1 page.", "F-gas leak check record for air conditioning system FW-33470, issued 9 December 2025, 2 pages, complete. It is signed by the leak check engineer.", "Refrigerant top-up log for air conditioning system FW-33470, issued 19 April 2026, 1 page. It is signed by the servicing engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00048-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lombmore Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "7 September 2026"}, "checklist": ["Audit finding sheets (signed)", "Management review minutes (signed)", "If the audit found a major non-conformity, also: major non-conformity corrective action plan (signed)", "Audit attendance sheet (signed)", "Previous audit follow-up record (issued within the last 24 months, signed)"], "submission": {"case": {"name": "internal audit IG-1902", "reference": "OH-77753", "details": ["The audit found a major non-conformity."]}, "documents received": ["Audit finding sheets for internal audit IG-1902, dated 17 June 2026. 2 pages, complete. The signature line is empty, so the document is not signed.", "Management review minutes for internal audit IG-1902, dated 25 May 2026. 4 pages, complete. Signed by the quality manager.", "Major non-conformity corrective action plan for internal audit IG-1902, dated 14 June 2026. 3 pages, complete. Signed by the quality manager.", "Previous audit follow-up record for internal audit IG-1902, dated 25 January 2025. 2 pages, complete. Signed by the quality manager.", "Audit attendance sheet for internal audit IG-1902, dated 21 June 2026. Single page. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 731}} {"id": "isc-te-00431-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Ebrbrook GmbH", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "12 May 2026"}, "checklist": ["Cost-benefit justification included", "Vendor quotation included, issued within the last 3 months", "Grant fund eligibility note included, issued within the last 6 months and signed", "Equipment purchase request form included and signed", "Three quotes comparison sheet included, issued within the last 3 months and signed"], "submission": {"case": {"name": "equipment OZ-94072", "reference": "EK-69340"}, "documents received": ["Budget spreadsheet for the whole department, covering equipment OZ-94072. Dated 1 March 2026. 3 pages, complete.", "Vendor quotation for equipment OZ-94072. Dated 8 March 2026. 2 pages, complete.", "Grant fund eligibility note for equipment OZ-94072. Dated 14 February 2026. 1 page. Signed by the grants officer.", "Maintenance plan for equipment OZ-94072. Dated 21 January 2026. 2 pages, complete.", "Equipment purchase request form for equipment OZ-94072. Dated 5 February 2026. 2 pages, complete. Signed by the department head.", "Three quotes comparison sheet for equipment OZ-94072. Dated 29 April 2026. 1 page. Signed by the procurement officer.", "Cost-benefit justification for equipment OZ-94072. Dated 1 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 573}} {"id": "isc-te-00246-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Glenmark Inc", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "13 July 2026"}, "checklist": ["Obtain proof of savings, issued within the last 2 months.", "Obtain recent bank statements, issued within the last 2 months.", "Obtain a benefit claim form that is valid (not expired) on the date of the review and signed.", "If the claimant has a non-dependant adult living in the household, also obtain a non-dependant income details form, signed.", "Obtain proof of national insurance number.", "Obtain proof of identity that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "Arjun Ingford", "reference": "TO-48296", "details": ["The claimant has a non-dependant adult living in the household."]}, "documents received": ["Benefit claim form for Arjun Ingford. Expiry date: 22 September 2027. 12 pages, complete. Signed by the claimant.", "Proof of national insurance number for Arjun Ingford. Date of issue: 30 April 2026. Single page.", "Lottery ticket kept as evidence of funds for Arjun Ingford. Date of issue: 31 May 2026. 2 pages, complete.", "Recent bank statements for Arjun Ingford. Date of issue: 20 June 2026. 12 pages, complete.", "Non-dependant income details form for Arjun Ingford. Date of issue: 29 June 2026. 2 pages, complete. Signed by the non-dependant.", "Proof of earnings for Arjun Ingford. Date of issue: 4 July 2026. 2 pages, complete.", "Proof of identity for Arjun Ingford. Expiry date: 24 July 2028. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00238-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Austmouth Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "11 August 2026"}, "checklist": ["If the borrower is self-employed, also: two most recent tax year overviews (issued within the last 18 months, signed)", "passport (valid (not expired) on the date of the review)", "gifted deposit letter (issued within the last 3 months, signed)", "mortgage application form (issued within the last 3 months, signed)", "three most recent payslips (issued within the last 3 months)"], "submission": {"case": {"name": "Charlotte Lovez", "reference": "OA-94851", "details": ["The borrower is not self-employed."]}, "cover note": "I am not sure that everything needed is in this pack. Please review and let me know if anything further is required.", "documents received": ["Three most recent payslips for Charlotte Lovez, dated 7 August 2026. 3 pages, complete.", "Passport for Charlotte Lovez, showing an expiry date of 15 December 2028. 2 pages, complete.", "Gifted deposit letter for Charlotte Lovez, dated 3 June 2026. Single page, signed by the donor of the gift.", "Three months of bank statements for Charlotte Lovez, dated 20 July 2026. 9 pages, complete.", "Mortgage application form for Charlotte Lovez, dated 4 July 2026. 10 pages, complete, signed by the borrower."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 726}} {"id": "isc-te-00326-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Marlthorpe LLP", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "5 August 2026"}, "checklist": ["P60 tax summary, issued within the last 15 months", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months and signed", "Passport, valid (not expired) on the date of the review", "Mortgage application form, issued within the last 3 months and signed", "Property valuation report, issued within the last 3 months and signed"], "submission": {"case": {"name": "Henry Bramell", "reference": "PP-95128", "details": ["The borrower is not self-employed."]}, "documents received": ["Mortgage_Application_Form_Bramell_PP-95128.pdf — Mortgage application form for Henry Bramell. Date of issue: 25 May 2026. 10 pages, complete. Signed by the borrower.", "P60_Bramell_PP-95128.pdf — P60 tax summary for Henry Bramell. Date of issue: 9 December 2025. 2 pages, complete.", "File_PP-95128_06.pdf — The contents of this file cannot be seen; the scan is blank.", "Property_Valuation_Report_Bramell_PP-95128.pdf — Property valuation report for Henry Bramell. Date of issue: 19 July 2026. 8 pages, complete. Signed by the valuer.", "Loan_Affordability_Calculator_Printout_Bramell_PP-95128.pdf — Loan affordability calculator printout for Henry Bramell. Date of issue: 25 May 2026. 10 pages, complete. Signed by the mortgage adviser.", "Passport_Bramell_PP-95128.pdf — Passport for Henry Bramell. Expiry date: 23 September 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00342-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Hondhurst Group", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "6 April 2026"}, "checklist": ["If the institute hosts research involving human participants, also: ethics committee annual return (issued within the last 12 months, signed)", "doctoral researcher progress summary (issued within the last 6 months, signed)", "director's declaration of interests (issued within the last 12 months, signed)", "staffing plan (issued within the last 6 months, signed)", "annual activity report (issued within the last 6 months, signed)", "financial expenditure summary (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Oxlbury Inc", "reference": "QW-70395", "details": ["The institute hosts research involving human participants."]}, "documents received": ["directors declaration of interests.pdf — A director's declaration of interests for Oxlbury Inc, issued as a single page. The date of issue is covered by a receipt stamp, so it cannot be read. The page bears the director's signature.", "publications list.pdf — A publications list for Oxlbury Inc, dated 30 December 2025. It runs to 4 pages, complete.", "doctoral researcher progress summary.pdf — A doctoral researcher progress summary for Oxlbury Inc, dated 4 January 2026. It runs to 2 pages, complete, and is signed by the doctoral researcher's supervisor.", "financial expenditure summary.pdf — A financial expenditure summary for Oxlbury Inc, dated 27 January 2026. It runs to 3 pages, complete, and is signed by the institute finance officer.", "staffing plan.pdf — A staffing plan for Oxlbury Inc, dated 24 October 2025. It runs to 2 pages, complete, and is signed by the institute director.", "annual activity report.pdf — An annual activity report for Oxlbury Inc, dated 31 October 2025. It runs to 12 pages, complete, and is signed by the institute director.", "ethics committee annual return.pdf — An ethics committee annual return for Oxlbury Inc, dated 10 May 2025. It runs to 2 pages, complete, and carries the signature of the ethics committee chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00428-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Jundwyn BV", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "10 March 2026"}, "checklist": ["Benefit claim form, valid (not expired) on the date of the review, signed", "Proof of national insurance number", "If the claimant has a non-dependant adult living in the household, also: non-dependant income details form, signed", "Current tenancy agreement, signed", "Recent bank statements, issued within the last 2 months"], "submission": {"case": {"name": "Alice Ostock", "reference": "MD-67214", "details": ["The claimant has a non-dependant adult living in the household."]}, "cover note": "I am sorry that this pack was put together in a rush. Sanne Knoxby", "documents received": ["tenancy-agreement_ostock.pdf. Current tenancy agreement about Alice Ostock, issued 31 December 2025. 12 pages, complete. Signed by the landlord.", "bank-statements_ostock.pdf. Recent bank statements about Alice Ostock, issued 20 January 2026. 12 pages, complete.", "ni-proof_ostock.pdf. Proof of national insurance number about Alice Ostock, issued 3 January 2026. It is a single page.", "earnings-proof_ostock.pdf. Proof of earnings about Alice Ostock, issued 28 February 2026. 2 pages, complete.", "id-proof_ostock.pdf. Proof of identity about Alice Ostock, expiring 5 September 2027. It is a single page.", "claim-form_ostock_v3.pdf. Benefit claim form about Alice Ostock, expiring 10 February 2027. 12 pages, complete. Signed by the claimant.", "non-dependant-income_ostock.pdf. Non-dependant income details form about Alice Ostock, issued 3 February 2026. 2 pages, complete. Signed by the non-dependant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00309-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Jarlmoor plc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "8 May 2026"}, "checklist": ["Asbestos survey report issued within the last 12 months", "Stamp duty return, signed", "Keys handover receipt, signed", "Company search report issued within the last 1 months", "Energy performance certificate valid (not expired) on the date of the review", "If the tenant is a newly formed company, also: signed parent company guarantee", "Guarantor consent letter, signed"], "submission": {"case": {"name": "premises GN-45739", "reference": "GN-17663", "details": ["The tenant is a newly formed company."]}, "documents received": ["company_search_report_GN-45739.pdf - Company search report for premises GN-45739. Date of issue: 21 April 2026. 2 pages, complete.", "title_information_document_GN-45739.pdf - Title information document for premises GN-45739. Date of issue: 1 February 2026. 3 pages, complete.", "keys_handover_receipt_GN-45739.pdf - Keys handover receipt for premises GN-45739. Date of issue: 18 February 2026. 1 page. Signed by the landlord.", "energy_performance_certificate_GN-45739.pdf - Energy performance certificate for premises GN-45739. Expiry date: 28 November 2026. 1 page.", "guarantor_consent_letter_GN-45739.pdf - Guarantor consent letter for premises GN-45739. Date of issue: 24 March 2026. 1 page. Signed by the guarantor.", "document_07.pdf - The contents of this file cannot be seen: the scan is blank.", "signed_parent_company_guarantee_GN-45739.pdf - Signed parent company guarantee for premises GN-45739. Date of issue: 1 May 2026. 3 pages, complete. Signed by the parent company.", "asbestos_survey_report_GN-45739.pdf - Asbestos survey report for premises GN-45739. Date of issue: 3 August 2025. 4 pages, complete.", "signed_draft_lease_GN-45739.pdf - Signed draft lease for premises GN-45739. Date of issue: 8 April 2026. 12 pages, complete. Signed by the landlord and the tenant.", "stamp_duty_return_GN-45739.pdf - Stamp duty return for premises GN-45739. Date of issue: 14 March 2026. 2 pages, complete. Signed by the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "conditional", "defect": "document present (circumstance holds), plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 10, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1027}} {"id": "isc-te-00158-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Yarvgate & Co", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "28 May 2026"}, "checklist": ["Knowledge test pass certificate on file", "Driver declaration of convictions, signed, on file", "Photo driving licence on file, valid on the date of the review and not expired", "Medical examination certificate on file, issued within the last 6 months and signed", "Licence application form on file, signed", "Criminal record check on file, issued within the last 3 months"], "submission": {"case": {"name": "Anna Lundcombe", "reference": "EX-98046"}, "documents received": ["Photo driving licence for Anna Lundcombe, expiring 30 January 2027. Only 1 of its 2 pages included (pages 1-1 of 2).", "Knowledge test pass certificate for Anna Lundcombe, dated 21 May 2026. Single page.", "Criminal record check for Anna Lundcombe, dated 15 May 2026. 6 pages, complete.", "Driver declaration of convictions for Anna Lundcombe, dated 8 March 2026. Signed by the driver, Anna Lundcombe. Single page.", "Medical examination certificate for Anna Lundcombe, dated 25 May 2026. 2 pages, complete. Signed by the examining doctor.", "Licence application form for Anna Lundcombe, dated 20 April 2026. 6 pages, complete. Signed by the applicant, Anna Lundcombe."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 734}} {"id": "isc-te-00105-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Oskcliff BV", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "16 April 2026"}, "checklist": ["Fraud screening result sheet issued within the last 3 months.", "Signature proof of delivery issued within the last 6 months and signed.", "Delivery confirmation issued within the last 6 months.", "Transaction record printout issued within the last 3 months.", "Chargeback response form, signed.", "Customer account details page issued within the last 3 months."], "submission": {"case": {"name": "disputed transaction EQ-46342", "reference": "VR-66300"}, "cover note": "I am sorry that this pack was assembled in a rush. If you spot any issues, I will be glad to sort them out.", "documents received": ["Customer account details page - EQ-46342.pdf. A one-page customer account details page for disputed transaction EQ-46342, with its date of issue shown as 4 April 2026.", "Transaction record printout - EQ-46342.pdf. A single-page transaction record printout for disputed transaction EQ-46342, issued on 26 March 2026.", "Terms of sale acceptance log - EQ-46342.pdf. A single-page terms of sale acceptance log for disputed transaction EQ-46342, issued on 13 June 2025.", "Fraud screening result sheet - EQ-46342.pdf. A single-page fraud screening result sheet for disputed transaction EQ-46342, dated 14 February 2026.", "Chargeback response form - EQ-46342.pdf. A chargeback response form for disputed transaction EQ-46342, dated 14 January 2026. It runs to 2 pages, complete, and is signed by the payments disputes team lead.", "Signature proof of delivery - EQ-46342.pdf. A one-page signature proof of delivery for disputed transaction EQ-46342, showing its date of issue as 12 January 2026. It is signed by the delivery driver.", "Delivery confirmation - EQ-46342.pdf. A one-page delivery confirmation for disputed transaction EQ-46342, showing its date of issue as 29 November 2025."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 909}} {"id": "isc-te-00123-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Thalhall GmbH", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "7 July 2026"}, "checklist": ["Drying contractor's certificate of completion, issued within the last 6 months and signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "Flood claim form, signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Buildings insurance policy schedule"], "submission": {"case": {"name": "property TU-69693", "reference": "ED-62889"}, "cover note": "Please could you approve this pack quickly, as all the paperwork is in order.", "documents received": ["Drying contractor's certificate of completion for property TU-69693, dated 20 June 2026. 2 pages, complete. Signed by the drying contractor.", "Flood claim form for property TU-69693, dated 4 April 2026. 5 pages, complete. Signed by the claimant.", "Photographs of flood water in the rooms for property TU-69693, dated 17 June 2026. Pages 1 to 1 are included; the total number of pages is not shown.", "Utility supplier's letter confirming the supply was cut off for property TU-69693, dated 9 August 2025. 1 page.", "Buildings insurance policy schedule for property TU-69693, dated 7 June 2026. 5 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00318-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Trelvale plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "29 April 2026"}, "checklist": ["Supplier self-assessment report, issued within the last 12 months, signed", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months, signed", "Raw material certificate of analysis, issued within the last 6 months, signed", "Certified quality management system certificate, valid (not expired) on the date of the review", "Supplier quality questionnaire, issued within the last 12 months, signed", "Supplier audit report, issued within the last 24 months, signed"], "submission": {"case": {"name": "Raskmoor Partners", "reference": "UB-25706", "details": ["The supplier subcontracts part of the production."]}, "documents received": ["Scanned subcontractor approval record for Raskmoor Partners, dated 26 April 2026. 2 pages, complete. Signed by the supplier's operations manager.", "Scanned financial stability statement for Raskmoor Partners, dated 23 February 2026. 2 pages, complete. Signed by the supplier's finance director.", "Scanned supplier quality questionnaire for Raskmoor Partners, dated 15 July 2025. 4 pages, complete. Signed by the supplier's quality manager.", "Scanned supplier audit report for Raskmoor Partners, dated 9 May 2025. 8 pages, complete. Signed by the lead auditor.", "Scanned certified quality management system certificate for Raskmoor Partners, showing an expiry date of 23 January 2027. Single page.", "Scanned supplier self-assessment report for Raskmoor Partners, dated 24 October 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Scanned raw material certificate of analysis for Raskmoor Partners, dated 23 February 2026. 2 pages, complete. The area of the last page where the signature would appear is covered by a sticky note, so it is not known whether the document is signed."]}}, "question": {"type": "choice", "instructions": "Does the pack fully satisfy the checklist? Check every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not trust cover notes and labels blindly, as they may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-73", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 870}} {"id": "isc-te-00027-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Nordlock BV", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "29 June 2026"}, "checklist": ["Check the line manager opinion note: it must have been issued within the last 2 months and be signed.", "Check the impact assessment on the team: it must be signed.", "Check the previous flexible working requests record: it must have been issued within the last 24 months.", "Check the current working pattern statement: it must have been issued within the last 3 months.", "Check the flexible working request form: it must be signed.", "Check the client or service impact statement: it must be signed."], "submission": {"case": {"name": "Folake Nebbski", "reference": "EQ-64109"}, "documents received": ["Flexible working request form about Folake Nebbski. It shows its date of issue as 14 June 2026, and it is signed by Folake Nebbski. 3 pages, complete.", "Proposed working pattern plan about Folake Nebbski. It shows its date of issue as 14 March 2026, and it is signed by Folake Nebbski. 2 pages, complete.", "Previous flexible working requests record about Folake Nebbski. The date on it is smudged and cannot be read. It is 1 page.", "Client or service impact statement about Folake Nebbski. It shows its date of issue as 7 April 2026, and it is signed by the line manager. It is 1 page.", "Trial period proposal about Folake Nebbski. It shows its date of issue as 8 April 2026, and it is signed by the line manager. It is 1 page.", "Current working pattern statement about Folake Nebbski. It shows its date of issue as 2 May 2026. It is 1 page.", "Impact assessment on the team about Folake Nebbski. It shows its date of issue as 29 May 2026, and it is signed by the line manager. 3 pages, complete.", "Line manager opinion note about Folake Nebbski. It shows its date of issue as 2 June 2026, and it is signed by the line manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 888}} {"id": "isc-te-00080-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Morvfell & Co", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "26 August 2026"}, "checklist": ["Root cause analysis report, issued within the last 3 months and signed.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Service level objective breach record, issued within the last 3 months.", "Follow-up owner assignment sheet, issued within the last 3 months and signed.", "Alerting rules review note, issued within the last 3 months."], "submission": {"case": {"name": "production incident VT-77812", "reference": "UP-54074"}, "documents received": ["Root cause analysis report for production incident VT-77812, dated 7 July 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Alerting rules review note for production incident VT-77812, dated 21 June 2026. 2 pages, complete.", "Postmortem meeting minutes for production incident VT-77812, dated 20 July 2026. 3 pages, complete. Signed by the chair of the postmortem meeting.", "Service level objective breach record for production incident VT-77812, dated 29 June 2026. Single page."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 496}} {"id": "isc-te-00088-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Aldmouth Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "23 April 2026"}, "checklist": ["Customer deposit receipt, issued within the last 3 months.", "Package holiday brochure page.", "Booking request form, signed.", "Travel insurance quote, issued within the last 1 months.", "Passport details form, signed.", "If the booking includes a car hire, also: car hire quotation, issued within the last 1 months.", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review."], "submission": {"case": {"name": "holiday booking HK-33923", "reference": "LS-73051", "details": ["The booking includes a car hire.", "The booking includes a child traveller."]}, "cover note": "Please could you approve this pack as quickly as possible? Everything is in order, so a swift sign-off would be much appreciated. Many thanks, Jack Bixthwaite", "documents received": ["Car hire quotation for holiday booking HK-33923. Date of issue: 11 April 2026. 2 pages, complete.", "Package holiday brochure page for holiday booking HK-33923. Date of issue: 17 January 2026. 1 page.", "Flight availability printout for holiday booking HK-33923. Date of issue: 12 April 2026. 2 pages, complete.", "Child passport copy for holiday booking HK-33923. Expiry date: 20 February 2028. 1 page.", "Booking request form for holiday booking HK-33923. Date of issue: 6 January 2026. Pages 1-1 of 2. Signed by the customer.", "Customer deposit receipt for holiday booking HK-33923. Date of issue: 10 April 2026. 1 page.", "Passport details form for holiday booking HK-33923. Date of issue: 10 April 2026. 1 page. Signed by the customer.", "Travel insurance quote for holiday booking HK-33923. Date of issue: 10 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 901}} {"id": "isc-te-00369-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Iskmark GmbH", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "7 September 2026"}, "checklist": ["Confirm the pack contains a travel policy extract showing advance eligibility.", "Confirm the pack contains a payroll deduction agreement for recovery of the advance, signed.", "Confirm the pack contains an outstanding advance clearance check, signed.", "Confirm the pack contains a costed trip estimate sheet, signed and issued within the last 3 months.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Confirm the pack contains a travel advance request form, signed."], "submission": {"case": {"name": "Matteo Mundham", "reference": "VW-11525"}, "cover note": "Please find attached everything needed for the advance pack for reference VW-11525. The pack is complete.", "documents received": ["Outstanding advance clearance check. Issued 19 August 2026, 1 page. Signed by the payroll administrator, confirming the check on outstanding advances for Matteo Mundham.", "Costed trip estimate sheet. Issued 4 August 2026, 1 page. Signed by Matteo Mundham, listing the estimated costs for the trip.", "Payroll deduction agreement for recovery of the advance. Issued 25 August 2026, 1 page. Signed by Matteo Mundham, agreeing that the advance will be recovered from pay.", "Travel advance request form. Issued 2 August 2026, 1 page. Signed by Matteo Mundham, requesting the travel advance.", "Travel policy extract showing advance eligibility. Issued 30 June 2026, 1 page. The extract shows that Matteo Mundham is eligible for a travel advance."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 769}} {"id": "isc-te-00156-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Baxridge Group", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "15 June 2026"}, "checklist": ["Right to work share code printout, issued within the last 3 months", "Medical examination certificate, issued within the last 6 months and signed", "Criminal record check, issued within the last 3 months", "Signed licence application form", "If the applicant is applying for a hackney carriage licence rather than private hire, also: vehicle specification sheet for the hackney carriage"], "submission": {"case": {"name": "Seren Bixingham", "reference": "GY-35046", "details": ["The applicant is applying for a private hire licence rather than hackney carriage."]}, "cover note": "This pack was already checked by a colleague before it came to you.", "documents received": ["GY-35046 Bixingham criminal record check. A criminal record check about Seren Bixingham, showing its date of issue as 10 June 2026, 6 pages, complete.", "GY-35046 Bixingham licence application form. A licence application form about Seren Bixingham, showing its date of issue as 24 May 2026, 6 pages, complete. It is signed by the applicant, Seren Bixingham.", "GY-35046 Bixingham medical examination certificate. A medical examination certificate about Seren Bixingham, showing its date of issue as 24 March 2026, 2 pages, complete. It is signed by the examining doctor.", "GY-35046 Bixingham work permit letter. A single-page work permit letter from an employer's HR department about Seren Bixingham, showing its date of issue as 29 March 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 782}} {"id": "isc-te-00082-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Larvcourt Inc", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "29 July 2026"}, "checklist": ["Localisation completeness report, issued within the last 1 month", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months and signed", "Marketing screenshot pack", "Privacy policy update, issued within the last 3 months", "If the mobile app release adds a new payment feature, also: payment provider compliance checklist, issued within the last 3 months and signed", "Store listing description, issued within the last 1 month", "Age rating questionnaire, signed"], "submission": {"case": {"name": "mobile app release GK-81797", "reference": "ZI-76687", "details": ["The mobile app release includes third-party analytics.", "The mobile app release adds a new payment feature."]}, "documents received": ["release-notes-GK-81797.pdf — Release notes for mobile app release GK-81797. It shows its date of issue as 17 July 2026. 2 pages, complete.", "localisation-completeness-report-GK-81797.pdf — Localisation completeness report for mobile app release GK-81797. It shows its date of issue as 23 July 2026. 2 pages, complete.", "store-listing-description-GK-81797.pdf — Store listing description for mobile app release GK-81797. It shows its date of issue as 15 July 2026. It is 1 page.", "analytics-data-consent-statement-GK-81797.pdf — Analytics data consent statement for mobile app release GK-81797. It shows its date of issue as 29 June 2026. It is 1 page, signed by the Data Protection Officer.", "marketing-screenshot-pack-GK-81797.pdf — Marketing screenshot pack for mobile app release GK-81797. It shows its date of issue as 31 May 2026. 6 pages, complete.", "privacy-policy-update-GK-81797.pdf — Privacy policy update for mobile app release GK-81797. It shows its date of issue as 24 April 2026. 2 pages, complete.", "payment-provider-compliance-checklist-GK-81797.pdf — Payment provider compliance checklist for mobile app release GK-81797. It shows its date of issue as 4 July 2026. 3 pages, complete, signed by the Payments Lead.", "age-rating-questionnaire-GK-81797.pdf — Age rating questionnaire for mobile app release GK-81797. It shows its date of issue as 17 April 2026. 2 pages, complete, signed by the Mobile Release Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1042}} {"id": "isc-te-00255-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Yselmoor Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "28 August 2026"}, "checklist": ["Customer contact details sheet (signed)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Loyalty scheme enrolment form (signed)", "Marketing consent form (signed)", "Initial points balance statement (issued within the last 3 months)", "Identity verification document (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Camille Rookett", "reference": "EV-96904", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Marketing consent form for Camille Rookett. It is dated 30 April 2026 and is a single page. It is signed by the member, Camille Rookett.", "Initial points balance statement for Camille Rookett. It is dated 17 July 2026 and is a single page. It shows the member's starting points balance.", "Identity verification document for Camille Rookett. It is a single page. It shows an expiry date of 21 December 2028.", "Customer contact details sheet for Camille Rookett. It is dated 30 April 2026 and is a single page. It is signed by the member, Camille Rookett.", "Loyalty scheme enrolment form for Camille Rookett. It is dated 9 May 2026 and is a single page. It is signed by the member, Camille Rookett."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00475-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Jaskside plc", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "5 March 2026"}, "checklist": ["If the employee has caring responsibilities for a dependent, also: caring responsibilities statement (signed).", "Trial period proposal (signed).", "Current working pattern statement (issued within the last 3 months).", "If the request is to work entirely from home, also: home working equipment checklist (signed).", "Line manager opinion note (issued within the last 2 months, signed).", "Impact assessment on the team (signed).", "Proposed working pattern plan (signed).", "Client or service impact statement (signed)."], "submission": {"case": {"name": "Beatriz Zellopoulos", "reference": "FK-25780", "details": ["The employee does not have caring responsibilities for a dependent.", "The request is not to work entirely from home."]}, "documents received": ["Proposed working pattern plan for Beatriz Zellopoulos. Dated 12 November 2025. 2 pages, complete, signed by Beatriz Zellopoulos.", "Client or service impact statement for Beatriz Zellopoulos. Dated 15 December 2025. Single page, signed by the line manager.", "Trial period proposal for Beatriz Zellopoulos. Dated 10 December 2025. Single page, signed by Beatriz Zellopoulos.", "Impact assessment on the team regarding Beatriz Zellopoulos. Dated 7 February 2026. 3 pages, complete, signed by the line manager.", "Line manager opinion note on Beatriz Zellopoulos. Dated 2 February 2026. 2 pages, complete, signed by the line manager.", "Current working pattern statement for Beatriz Zellopoulos. Dated 15 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 799}} {"id": "isc-te-00325-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Cresklund BV", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "30 March 2026"}, "checklist": ["Obtain the bank interest statement, issued within the last 13 months.", "If the household sold a property other than its main home during the tax year, also obtain the property disposal calculation sheet, signed.", "Obtain the pension contribution certificate, issued within the last 13 months.", "Obtain the capital gains asset record.", "Obtain the rental income record.", "Obtain the childcare payment receipt, issued within the last 13 months.", "If one household member worked abroad for part of the year, also obtain the foreign earnings statement, issued within the last 13 months.", "Obtain the employment income summary, issued within the last 13 months."], "submission": {"case": {"name": "household tax affairs VX-14371", "reference": "GX-21410", "details": ["The household sold a property other than its main home during the tax year.", "One household member worked abroad for part of the year."]}, "documents received": ["Rental income record for household tax affairs VX-14371, dated 3 February 2026. 4 pages, complete.", "Childcare payment receipt for household tax affairs VX-14371, dated 26 September 2025. 1 page.", "Property disposal calculation sheet for household tax affairs VX-14371, dated 27 February 2026. 2 pages, complete. Signed by the household's own tax filer.", "Bank interest statement covering household tax affairs VX-14371, dated 26 May 2025. 3 pages, complete.", "Employment income summary for household tax affairs VX-14371, dated 19 November 2025. 2 pages, complete.", "Foreign earnings statement for household tax affairs VX-14371, dated 27 July 2025. 2 pages, complete.", "Pension contribution certificate for household tax affairs VX-14371, dated 6 December 2025. 2 pages, complete.", "Gift aid donation summary for household tax affairs VX-14371, dated 1 January 2026. 1 page.", "Capital gains asset record for household tax affairs VX-14371, dated 28 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 941}} {"id": "isc-te-00408-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Jarlfeld Inc", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "17 April 2026"}, "checklist": ["Signed audit checklist for each area visited", "Signed audit finding sheets", "Signed audit interview notes", "Signed audit attendance sheet", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list (signed)", "Signed previous audit follow-up record issued within the last 24 months"], "submission": {"case": {"name": "internal audit OC-33937", "reference": "ST-29209", "details": ["The audit did not cover the calibration laboratory."]}, "cover note": "I have put the evidence pack for internal audit OC-33937 together and sent it on for review, but I am not sure everything needed is included.", "documents received": ["OC-33937_audit_finding_sheets_rev2.pdf. Audit finding sheets for internal audit OC-33937, dated 26 March 2026. 2 pages, complete. Signed by the lead auditor.", "OC-33937_audit_checklist.pdf. Audit checklist for each area visited for internal audit OC-33937, dated 1 March 2026. 4 pages, complete. Signed by the lead auditor.", "OC-33937_previous_audit_follow_up_record.pdf. Previous audit follow-up record for internal audit OC-33937, dated 29 March 2026. 2 pages, complete. Signed by the quality manager.", "OC-33937_audit_attendance_sheet.pdf. Audit attendance sheet for internal audit OC-33937, dated 16 January 2026. Single page. Signed by the site management review board chair.", "OC-33937_audit_interview_notes.pdf. Audit interview notes for internal audit OC-33937, dated 10 April 2026. 3 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 834}} {"id": "isc-te-00151-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ivrlund BV", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "12 May 2026"}, "checklist": ["Line manager approval, signed.", "Flight itinerary quote, issued within the last 1 months.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Hotel booking confirmation.", "Travel request form, signed.", "If the traveller is not a passport holder of the destination country, also: work permit confirmation.", "Travel policy acknowledgement, signed."], "submission": {"case": {"name": "business trip JP-14209", "reference": "DD-15730", "details": ["The traveller holds a passport of the destination country."]}, "documents received": ["Passport-copy-JP-14209.pdf. A single-page passport copy for international travel for business trip JP-14209, showing an expiry date of 8 December 2027.", "Travel-policy-acknowledgement-JP-14209.pdf. A single-page travel policy acknowledgement for business trip JP-14209, issued on 27 April 2026. It carries the signature of the traveller.", "Flight-itinerary-quote-JP-14209.pdf. A flight itinerary quote for business trip JP-14209, issued on 3 May 2026. 2 pages, complete.", "File-010.pdf. The scan is blank and too faint, so its contents cannot be seen.", "Line-manager-approval-JP-14209.pdf. A single-page line manager approval for business trip JP-14209, issued on 11 April 2026. It carries the signature of the line manager.", "Hotel-booking-confirmation-JP-14209.pdf. A hotel booking confirmation for business trip JP-14209, issued on 15 March 2026. 2 pages, complete.", "Boarding-pass-JP-14209.pdf. A boarding pass from an earlier trip, for business trip JP-14209, issued on 3 May 2026. 2 pages, complete.", "Trip-cost-estimate-JP-14209.pdf. A single-page trip cost estimate for business trip JP-14209, issued on 12 April 2026. It is signed by the travel coordinator.", "Travel-request-form-JP-14209.pdf. A travel request form for business trip JP-14209, issued on 21 March 2026. 2 pages, complete. It is signed by the traveller."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 980}} {"id": "isc-te-00012-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Wendhaven Inc", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "27 July 2026"}, "checklist": ["Photo identification, valid (not expired) on the date of the review: present", "Fraud questionnaire, signed: present", "Signature verification record, signed: present", "Card replacement request form, signed: present", "Delivery address confirmation, signed: present", "Confirmation of contact details, issued within the last 3 months: present"], "submission": {"case": {"name": "Lin Yellmore", "reference": "BW-71574"}, "documents received": ["Lost card declaration - Lin Yellmore.pdf — Lost card declaration for Lin Yellmore, dated 22 April 2026, single page. It is signed by the cardholder.", "Signature verification record - Lin Yellmore.pdf — Signature verification record for Lin Yellmore, dated 26 April 2026, single page. It is signed by the bank officer who carried out the verification.", "Card replacement request form - Lin Yellmore.pdf — Card replacement request form for Lin Yellmore, dated 23 April 2026. 2 pages, complete. It is signed by the cardholder.", "Fraud questionnaire - Lin Yellmore.pdf — Fraud questionnaire for Lin Yellmore, dated 6 July 2026. 2 pages, complete. It is signed by the cardholder.", "Delivery address confirmation - Lin Yellmore.pdf — Delivery address confirmation for Lin Yellmore, dated 24 May 2026, single page. It is signed by the cardholder.", "Confirmation of contact details - Lin Yellmore.pdf — Confirmation of contact details for Lin Yellmore, dated 4 July 2026, single page.", "Photo identification - Lin Yellmore.pdf — Photo identification for Lin Yellmore, single page. It shows an expiry date of 7 September 2025.", "Account statement - Lin Yellmore.pdf — Account statement showing recent activity for Lin Yellmore, dated 23 July 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "expired", "defect": "expired before the review", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 849}} {"id": "isc-te-00247-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Faldmont GmbH", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "27 April 2026"}, "checklist": ["Rent book or rent payment schedule issued within the last 2 months.", "Benefit claim form that is valid, not expired, on the date of the review, signed.", "Current tenancy agreement, signed.", "Proof of identity that is valid, not expired, on the date of the review."], "submission": {"case": {"name": "Simon Holtani", "reference": "HP-46378"}, "documents received": ["Current tenancy agreement. The agreement is about Simon Holtani and shows its date of issue as 27 March 2026. 12 pages, complete. It is signed by the landlord.", "Rent book or rent payment schedule. The document is about Simon Holtani and shows its date of issue as 4 April 2026. 4 pages, complete.", "Proof of identity. The document is about Simon Holtani and shows its expiry date as 4 July 2027. It is a single page.", "Benefit claim form. The form is about Simon Holtani and shows its expiry date as 27 May 2025. 12 pages, complete. It is signed by the claimant.", "Proof of national insurance number. The document is about Simon Holtani and shows its date of issue as 6 February 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "expired", "defect": "expired before the review", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 701}} {"id": "isc-te-00187-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Baxwyn Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "27 July 2026"}, "checklist": ["If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer (issued within the last 3 months)", "depreciation schedule for the asset to date", "sales invoice or receipt for the sale proceeds (issued within the last 3 months)", "profit or loss on disposal calculation (signed)", "board or budget holder approval for the disposal (signed)"], "submission": {"case": {"name": "disposed asset NB-8361", "reference": "QR-52405", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Asset de-registration and tag removal record, dated 20 May 2026, for disposed asset NB-8361. 1 page. It is signed by the asset register administrator.", "Profit or loss on disposal calculation, dated 20 July 2026, for disposed asset NB-8361. 1 page. It is signed by the group financial controller.", "Depreciation schedule for the asset to date, dated 5 June 2026, for disposed asset NB-8361. 2 pages, complete.", "Asset disposal request form, dated 17 June 2026, for disposed asset NB-8361. 2 pages, complete. It is signed by the requesting department manager.", "Sales invoice or receipt for the sale proceeds, dated 22 April 2026, for disposed asset NB-8361. 1 page.", "Board or budget holder approval for the disposal, dated 5 April 2026, for disposed asset NB-8361. 1 page. It is signed by the budget holder.", "Part-exchange valuation from the dealer, dated 29 May 2026, for disposed asset NB-8361. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete relative to the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-35", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00316-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Weskwell Inc", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "2 July 2026"}, "checklist": ["Previous audit findings closure file (signed)", "Layout tour plan (signed)", "Audit agenda (signed)", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary (issued within the last 3 months, signed)", "Calibration status summary (issued within the last 1 months, signed)", "Open corrective action list (issued within the last 1 months, signed)"], "submission": {"case": {"name": "customer audit visit YP-49316", "reference": "TE-85611", "details": ["The customer auditor requests access to sub-tier supplier records."]}, "documents received": ["Audit agenda for customer audit visit YP-49316, dated 4 June 2026. Single page. Signed by the quality management office manager.", "Calibration status summary for customer audit visit YP-49316, dated 25 June 2026. 2 pages, complete. Signed by the metrology manager.", "Open corrective action list for customer audit visit YP-49316, dated 28 June 2026. 2 pages, complete. Signed by the quality management office manager.", "Sub-tier supplier records summary for customer audit visit YP-49316, dated 16 May 2026. 3 pages, complete. Signed by the purchasing manager.", "Audit scope statement for customer audit visit YP-49316, dated 13 April 2026. Single page. Signed by the quality management office manager.", "List of corrective actions closed two years ago for customer audit visit YP-49316, dated 28 June 2026. 2 pages, complete. Signed by the quality management office manager.", "Previous audit findings closure file for customer audit visit YP-49316, dated 5 May 2026. 6 pages, complete. Signed by the quality management office manager.", "Layout tour plan for customer audit visit YP-49316, dated 28 March 2026. Single page. Signed by the quality management office manager."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and determine completeness. Check each checklist line that applies to this case. A required document counts only if it matches the listed document kind (not something similar), deals with the subject of the case, has all pages intact, is signed wherever the checklist calls for a signature, had not expired by the review date, and was issued within the timeframe the checklist permits. A conditional line is applicable only if its circumstance holds for the case. complete: all applicable lines are met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, yet at least one cannot be resolved from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead you; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-8", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00244-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Elstley plc", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 June 2026"}, "checklist": ["Travel request form, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Travel policy acknowledgement, signed.", "Hotel booking confirmation.", "Passport copy for international travel, valid (not expired) on the date of the review."], "submission": {"case": {"name": "business trip CM-86741", "reference": "KC-24296", "details": ["The trip involves travel to a country requiring a visa."]}, "cover note": "Please find attached the pack for business trip CM-86741 (reference KC-24296). Everything needed is attached and complete. Kindly review at your convenience.", "documents received": ["CM-86741_passport_copy.pdf. Passport copy for international travel for business trip CM-86741, single page. The passport expires 10 December 2028.", "CM-86741_travel_request_form.pdf. Travel request form for business trip CM-86741, issued 3 May 2026. Signed by the traveller, 2 pages, complete.", "CM-86741_travel_policy_acknowledgement.pdf. Travel policy acknowledgement for business trip CM-86741, issued 21 May 2026. Signed by the traveller, single page.", "CM-86741_hotel_booking_confirmation.pdf. Hotel booking confirmation for business trip CM-86741, issued 28 February 2026, 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 568}} {"id": "isc-te-00223-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Jundbury Limited", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "14 August 2026"}, "checklist": ["Confirm that the pack contains a transfer completion confirmation issued within the last 1 months, signed.", "Confirm that the pack contains an outbound loading record issued within the last 1 months, signed.", "Confirm that the pack contains an inbound unloading record issued within the last 1 months, signed.", "Confirm that the pack contains a damaged goods exception sheet issued within the last 1 months, signed.", "Confirm that the pack contains a seal number log issued within the last 1 months, signed."], "submission": {"case": {"name": "cross-dock transfer HU-37848", "reference": "TS-97557"}, "documents received": ["damaged_goods_exception_sheet_HU-37848_25Jul2026.pdf. Damaged goods exception sheet for cross-dock transfer HU-37848, dated 25 July 2026. Single page, signed by the warehouse shift supervisor.", "transfer_completion_confirmation_HU-37848_6Aug2026_v3.pdf. Transfer completion confirmation for cross-dock transfer HU-37848, dated 6 August 2026. Single page, signed by the transport planning team lead.", "seal_number_log_HU-37848_12Aug2026.pdf. Seal number log for cross-dock transfer HU-37848, dated 12 August 2026. Single page, signed by the outbound driver.", "outbound_loading_record_HU-37848_10Aug2026.pdf. Outbound loading record for cross-dock transfer HU-37848, dated 10 August 2026. Single page, signed by the outbound loading supervisor.", "inbound_unloading_record_HU-37848_5Aug2026.pdf. Inbound unloading record for cross-dock transfer HU-37848, dated 5 August 2026. Single page, signed by the inbound unloading supervisor."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and say whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must concern the subject of the case, all its pages must be present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-0", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 878}} {"id": "isc-te-00092-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Aldness Partners", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "25 May 2026"}, "checklist": ["Leaver notification form, signed", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed", "Non-disclosure reminder acknowledgement, signed", "Service desk ticket closure summary, issued within the last 1 months", "Equipment return receipt, issued within the last 1 months, signed", "Final payroll cut-off note, issued within the last 1 months, signed", "Line manager confirmation, issued within the last 1 months, signed"], "submission": {"case": {"name": "Vikram Brodard", "reference": "VR-80988", "details": ["The leaver held no privileged administrator accounts."]}, "documents received": ["Service_desk_closure_summary_Brodard_20260517.pdf. A service desk ticket closure summary for Vikram Brodard, dated 17 May 2026. 3 pages, complete.", "Leaver_notification_form_Brodard_20260410.pdf. A leaver notification form for Vikram Brodard, dated 10 April 2026. 2 pages, complete. It is signed by the line manager.", "Access_rights_inventory_Brodard_20260509.pdf. An access rights inventory for Vikram Brodard, dated 9 May 2026. 4 pages, complete.", "NDA_reminder_ack_Brodard_20260319.pdf. A non-disclosure reminder acknowledgement for Vikram Brodard, dated 19 March 2026. It is a single page and is signed by the departing employee.", "Line_manager_confirmation_Brodard_20260505.pdf. A line manager confirmation for Vikram Brodard, dated 5 May 2026. It is a single page and is signed by the line manager.", "Equipment_return_receipt_Brodard_20260522.pdf. An equipment return receipt for Vikram Brodard, dated 22 May 2026. It is a single page and is signed by the receiving IT asset officer.", "Payroll_cut_off_note_Brodard_20260523.pdf. A final payroll cut-off note for Vikram Brodard, dated 23 May 2026. It is a single page and is signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 949}} {"id": "isc-te-00138-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Orrmark & Co", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "6 March 2026"}, "checklist": ["Audit agenda, signed", "Open corrective action list, issued within the last 1 months, signed", "Document control list, issued within the last 3 months, signed", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary, issued within the last 3 months, signed", "Audit scope statement, signed"], "submission": {"case": {"name": "customer audit visit WK-33681", "reference": "CB-79631", "details": ["The customer auditor does not request access to sub-tier supplier records."]}, "cover note": "Everything needed is attached and complete.", "documents received": ["Audit scope statement for customer audit visit WK-33681. Date of issue: 21 November 2025. Single page, signed by the quality management office lead.", "Layout tour plan for customer audit visit WK-33681. Date of issue: 21 January 2026. Single page, signed by the quality management office lead.", "Open corrective action list for customer audit visit WK-33681. Date of issue: 20 February 2026. 2 pages, complete. Signed by the quality management office lead.", "Audit agenda for customer audit visit WK-33681. Date of issue: 23 November 2025. Single page, signed by the quality management office lead.", "Document control list for customer audit visit WK-33681. Date of issue: 24 February 2026. Pages 1-2 of 4. Signed by the quality management office lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 777}} {"id": "isc-te-00437-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Faldcourt & Co", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "5 August 2026"}, "checklist": ["Complaint escalation form, issued within the last 1 month and signed", "Proposed resolution letter draft, signed", "Customer contact log, issued within the last 3 months", "Policy breach summary, issued within the last 3 months and signed", "Original complaint record, issued within the last 6 months"], "submission": {"case": {"name": "escalated complaint BO-70275", "reference": "JZ-82529"}, "cover note": "Everything in this pack is in order, so I would be grateful for a quick approval when you can.", "documents received": ["Customer contact log for escalated complaint BO-70275, dated 26 April 2025. 3 pages, complete.", "Proposed resolution letter draft for escalated complaint BO-70275, dated 25 April 2026. 2 pages, complete. Signed by the customer relations manager.", "Policy breach summary for escalated complaint BO-70275, dated 13 June 2026. 2 pages, complete. Signed by the compliance officer.", "Original complaint record for escalated complaint BO-70275, dated 7 June 2026. 2 pages, complete.", "Complaint escalation form for escalated complaint BO-70275, dated 15 July 2026. 2 pages, complete. Signed by the customer relations team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 734}} {"id": "isc-te-00216-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Boltlund SAS", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "7 September 2026"}, "checklist": ["Asbestos survey report, issued within the last 12 months.", "Energy performance certificate, valid (not expired) on the date of the review.", "Signed stamp duty return.", "Guarantor consent letter, signed."], "submission": {"case": {"name": "premises KD-67988", "reference": "ID-68027"}, "documents received": ["EPC_KD-67988.pdf. Energy performance certificate for premises KD-67988, expiring 23 April 2027. 1 page.", "Asbestos_Survey_Report_KD-67988_22Aug2026.pdf. Asbestos survey report for premises KD-67988, dated 22 August 2026. 4 pages, complete.", "Stamp_Duty_Return_KD-67988_29Jul2026.pdf. Stamp duty return for premises KD-67988, dated 29 July 2026. 2 pages, complete. Signed by the tenant's finance director.", "Guarantor_Consent_Letter_GZ-46331_24Aug2026.pdf. Guarantor consent letter for premises GZ-46331, dated 24 August 2026. 1 page. Signed by the guarantor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 720}} {"id": "isc-te-00175-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Selvlund SAS", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "2 July 2026"}, "checklist": ["Check that the expense claim form is signed.", "If the claim exceeds the limit that requires director sign-off, also: check for a director approval slip issued within the last 3 months and signed.", "Check for a train ticket receipt.", "Check for a conference fee invoice issued within the last 12 months.", "Check for a currency conversion statement issued within the last 6 months."], "submission": {"case": {"name": "Sarah Quillley", "reference": "FZ-65007", "details": ["The claim is below the limit requiring director sign-off."]}, "documents received": ["Currency conversion statement - Sarah Quillley.pdf - A single-page currency conversion statement for Sarah Quillley, dated 21 April 2026.", "Expense claim form - Sarah Quillley.pdf - A 2-page expense claim form for Sarah Quillley, dated 17 May 2026. 2 pages, complete. It has been signed by Sarah Quillley.", "Train ticket receipt - Sarah Quillley.pdf - A single-page train ticket receipt for Sarah Quillley, dated 4 April 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 659}} {"id": "isc-te-00355-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Baxmere Limited", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "4 August 2026"}, "checklist": ["Vehicle condition report, signed", "Driving licence, valid (not expired) on the date of the review, signed", "Passport, valid (not expired) on the date of the review, signed", "Credit card in the driver's name, valid (not expired) on the date of the review, signed"], "submission": {"case": {"name": "Orla Fitzard", "reference": "GK-82009"}, "documents received": ["A scanned driving licence in the name of Orla Fitzard, showing an expiry date of 3 May 2028. 2 pages, complete. The licence is signed by the licence holder.", "A file named Scan_005.pdf. The scan is blank and its contents cannot be seen.", "A scanned credit card in the driver's name of Orla Fitzard, showing an expiry date of 9 February 2027. Single page. The card is signed by the cardholder.", "A scanned passport in the name of Orla Fitzard, showing an expiry date of 14 November 2027. Single page. The passport is signed by the bearer.", "A scanned vehicle condition report for Orla Fitzard, showing a date of issue of 9 April 2026. 2 pages, complete. The report is signed by the branch staff member who carried out the inspection."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 714}} {"id": "isc-te-00404-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Oxlbury GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "11 August 2026"}, "checklist": ["Signed lease agreement, signed.", "Racking inspection report, issued within the last 12 months, signed.", "Planning permission.", "Asbestos survey.", "If the warehouse stores food products, also: food storage approval certificate, valid (not expired) on the date of the review.", "Utilities connection certificate."], "submission": {"case": {"name": "warehouse CF-86712", "reference": "NS-98453"}, "cover note": "Hello, please could you approve this pack as quickly as possible, as all the paperwork is in order? Many thanks, Ngozi Thornstow", "documents received": ["racking-inspection-report-CF-86712.pdf — Racking inspection report for warehouse CF-86712. Date of issue: 24 August 2025. 2 pages, complete. Signed by the racking inspector.", "asbestos-survey-CF-86712.pdf — Asbestos survey for warehouse CF-86712. Date of issue: 5 May 2026. 5 pages, complete.", "planning-permission-CF-86712.pdf — Planning permission for warehouse CF-86712. Date of issue: 2 July 2026. 2 pages, complete.", "lease-agreement-CF-86712.pdf — Signed lease agreement for warehouse CF-86712. Date of issue: 2 May 2026. 8 pages, complete. Signed by the landlord and Oxlbury GmbH.", "utilities-connection-certificate-CF-86712.pdf — Utilities connection certificate for warehouse CF-86712. Date of issue: 29 May 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Step through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete if every applicable line is met (extra documents do not matter). Reply incomplete if at least one applicable line is not met. Reply unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, which may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-27", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 815}} {"id": "isc-te-00330-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Marlmoor GmbH", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "17 April 2026"}, "checklist": ["Line manager approval, signed", "If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Visa entry requirement printout, issued within the last 3 months", "Flight itinerary quote, issued within the last 1 months", "Travel request form, signed", "If the trip involves travel to a country requiring a visa, also: visa approval letter", "Hotel booking confirmation"], "submission": {"case": {"name": "business trip LT-79663", "reference": "RA-34404", "details": ["The traveller holds a passport of the destination country.", "The trip involves travel to a country requiring a visa."]}, "documents received": ["line manager approval LT-79663. It is a single-page line manager approval for business trip LT-79663, dated 10 March 2026, and it is signed by the traveller's line manager.", "visa entry requirement printout LT-79663. It is a visa entry requirement printout for business trip LT-79663, dated 8 February 2026. 2 pages, complete.", "passport copy LT-79663. It is a single-page passport copy for international travel for business trip LT-79663, showing an expiry date of 1 October 2026.", "travel request form LT-79663. It is a travel request form for business trip LT-79663, dated 21 March 2026. 2 pages, complete. It is signed by the traveller.", "visa approval letter LT-79663. It is a visa approval letter for business trip LT-79663, dated 28 March 2026. 2 pages, complete.", "hotel booking confirmation LT-79663. It is a hotel booking confirmation for business trip LT-79663, dated 25 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 860}} {"id": "isc-te-00169-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Vornmere Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "10 June 2026"}, "checklist": ["Loyalty scheme enrolment form (signed)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Nominated store preference form (signed)", "Initial points balance statement (issued within the last 3 months)", "Terms and conditions acceptance sheet (signed)"], "submission": {"case": {"name": "Emily Kipaker", "reference": "LI-14145", "details": ["The customer is joining as a household account with a shared card."]}, "documents received": ["Terms and conditions acceptance sheet for Emily Kipaker, dated 1 March 2026. A single page, signed by the member, Emily Kipaker.", "Loyalty scheme enrolment form for Emily Kipaker, dated 29 May 2026. A single page, signed by the member, Emily Kipaker.", "Marketing consent form for Emily Kipaker, dated 24 February 2026. A single page, signed by the member, Emily Kipaker.", "Points transfer request for Emily Kipaker, dated 22 March 2026. A single page, signed by the member, Emily Kipaker.", "Initial points balance statement for Emily Kipaker, dated 6 April 2026. A single page.", "Nominated store preference form for Emily Kipaker, dated 19 May 2026. A single page, signed by the member, Emily Kipaker."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 759}} {"id": "isc-te-00312-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Abrbury Ltd", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "26 May 2026"}, "checklist": ["Outbound loading record issued within the last 1 months and signed.", "Cross-dock slot booking sheet issued within the last 1 months and signed.", "Transfer manifest signed.", "Inbound unloading record issued within the last 1 months and signed.", "Transfer completion confirmation issued within the last 1 months and signed.", "Seal number log issued within the last 1 months and signed.", "If the transfer is an international movement, also: transit customs document, signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer LP-90487", "reference": "KA-79216", "details": ["The transfer is not an international movement.", "The transfer includes a temperature-controlled load."]}, "documents received": ["Inbound unloading record for cross-dock transfer LP-90487, dated 20 May 2026, 1 page. Signed by the inbound unloading supervisor.", "Seal number log for cross-dock transfer LP-90487, dated 17 May 2026, 1 page. Signed by the sealing operative.", "Outbound loading record for cross-dock transfer LP-90487, dated 16 May 2026, 1 page. Signed by the outbound loading supervisor.", "Damaged goods exception sheet for cross-dock transfer LP-90487, dated 20 May 2026, 1 page. Signed by the inbound unloading supervisor.", "Transfer completion confirmation for cross-dock transfer LP-90487, dated 15 May 2026, 1 page. Signed by the transfer coordinator.", "Cross-dock slot booking sheet for cross-dock transfer LP-90487, dated 24 May 2026, 1 page. Signed by the slot booking coordinator.", "Cross-dock chiller unit check sheet for cross-dock transfer LP-90487, dated 6 May 2026, 1 page. Signed by the chiller unit technician.", "Transfer manifest for cross-dock transfer LP-90487, dated 24 February 2026, 3 pages, complete. Signed by the transport planner."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and say whether it is complete. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-47", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 941}} {"id": "isc-te-00084-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Stervfeld GmbH", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "10 September 2026"}, "checklist": ["If the design changes how customer data is stored, also: data protection review sign-off (signed)", "review board feedback summary (issued within the last 3 months, signed)", "proposed architecture diagram", "problem statement page", "cost estimate sheet (issued within the last 6 months)", "security threat model (issued within the last 6 months)"], "submission": {"case": {"name": "design document AE-97456", "reference": "UG-66655", "details": ["The design changes how customer data is stored."]}, "documents received": ["Cost estimate sheet for design document AE-97456. Date of issue: 30 August 2026. 2 pages, complete.", "Security threat model for design document AE-97456. Date of issue: 7 June 2026. 4 pages, complete.", "Proposed architecture diagram for design document AE-97456. Date of issue: 18 August 2026. Single page.", "Problem statement page for design document AE-97456. Date of issue: 7 August 2026. 2 pages, complete.", "Capacity and load estimate for design document AE-97456. Date of issue: 13 April 2026. 3 pages, complete.", "Review board feedback summary for design document AE-97456. Date of issue: 3 August 2026. 2 pages, complete. Signed by the review board chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00181-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Wynstead Inc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "26 May 2026"}, "checklist": ["Leaver notification form, signed", "Shared mailbox handover record, issued within the last 1 month, signed", "Service desk ticket closure summary, issued within the last 1 month", "Line manager confirmation, issued within the last 1 month, signed", "Final payroll cut-off note, issued within the last 1 month, signed"], "submission": {"case": {"name": "James Fitzford", "reference": "IF-45020"}, "documents received": ["leaver_notification_form.pdf. This leaver notification form for James Fitzford is dated 1 February 2026 and runs to 2 pages, complete. It is signed by the line manager.", "shared_mailbox_handover_record.pdf. This shared mailbox handover record for James Fitzford is dated 12 May 2026 and runs to 2 pages, complete. It is signed by the shared mailbox owner.", "final_payroll_cutoff_note.pdf. This final payroll cut-off note for James Fitzford is dated 8 May 2026 and is a single page. It is signed by the payroll officer.", "document_04.pdf. The contents of this file cannot be seen, as the scan is blank.", "service_desk_ticket_closure_summary.pdf. This service desk ticket closure summary for James Fitzford is dated 13 May 2026 and runs to 3 pages, complete.", "non_disclosure_reminder_acknowledgement.pdf. This non-disclosure reminder acknowledgement for James Fitzford is dated 27 March 2026 and is a single page. It is signed by the leaver."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 765}} {"id": "isc-te-00429-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Ilvgate & Co", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "20 July 2026"}, "checklist": ["Rent book or rent payment schedule, issued within the last 2 months.", "Proof of identity, valid (not expired) on the date of the review.", "Proof of national insurance number.", "If the claimant is living in temporary accommodation arranged by the council, also: temporary accommodation placement letter.", "Recent bank statements, issued within the last 2 months.", "Benefit claim form, valid (not expired) on the date of the review, signed.", "Current tenancy agreement, signed."], "submission": {"case": {"name": "Joseph Wolmini", "reference": "UI-33074", "details": ["The claimant is living in ordinary private rented accommodation."]}, "cover note": "I am not sure everything needed is in this pack. Please get in touch if anything else is required.", "documents received": ["tenancy_agreement_wolmini_ui33074.pdf — Current tenancy agreement relating to Joseph Wolmini. It shows a date of issue of 17 April 2026. 12 pages, complete. It is signed by the claimant and the landlord.", "proof_of_ni_number_wolmini_ui33074.pdf — Proof of national insurance number relating to Joseph Wolmini. It shows a date of issue of 10 April 2026. Single page.", "proof_of_identity_wolmini_ui33074.pdf — Proof of identity relating to Joseph Wolmini. It shows an expiry date of 11 June 2027. Single page.", "bank_statements_wolmini_ui33074.pdf — Recent bank statements relating to Joseph Wolmini. They show a date of issue of 8 June 2026. 12 pages, complete.", "rent_book_wolmini_ui33074.pdf — Rent book or rent payment schedule relating to Joseph Wolmini. It shows a date of issue of 22 June 2026. 4 pages, complete.", "benefit_claim_form_wolmini_ui33074.pdf — Benefit claim form relating to Joseph Wolmini. It shows an expiry date of 29 April 2028. 12 pages, complete. It is signed by the claimant, Joseph Wolmini."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack satisfies the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-66", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 901}} {"id": "isc-te-00422-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pentridge Ltd", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "1 May 2026"}, "checklist": ["Supplier response letter, issued within the last 3 months and signed", "Contract compliance checklist, signed", "Quality inspection report, issued within the last 6 months and signed", "If the supplier is being considered for an expanded scope, also: expanded scope assessment memo, signed", "Invoice discrepancy log", "Delivery record summary, issued within the last 12 months"], "submission": {"case": {"name": "Lombcombe BV", "reference": "RE-90972", "details": ["The supplier's scope is staying the same."]}, "documents received": ["Quality inspection report for Lombcombe BV, dated 24 April 2026. 3 pages, complete. Signed by the quality inspector.", "Contract compliance checklist for Lombcombe BV, dated 5 January 2026. 3 pages, complete. Signed by the procurement lead.", "Corrective action plan for Lombcombe BV, dated 25 February 2026. 2 pages, complete. Signed by the supplier's operations director.", "Supplier response letter for Lombcombe BV, dated 19 February 2026. A single page, signed by the supplier's account manager.", "Delivery record summary for Lombcombe BV, dated 7 January 2026. 2 pages, complete.", "Invoice discrepancy log for Lombcombe BV, dated 1 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 717}} {"id": "isc-te-00170-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Ebrshaw Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "13 April 2026"}, "checklist": ["Proposed architecture diagram", "Migration and rollout plan", "Review board feedback summary (issued within the last 3 months, signed)", "Problem statement page", "Cost estimate sheet (issued within the last 6 months)", "If the design introduces a new third-party dependency, also: third-party dependency risk assessment (issued within the last 6 months, signed)", "If the design changes how customer data is stored, also: data protection review sign-off (signed)"], "submission": {"case": {"name": "design document UC-75490", "reference": "AO-68653", "details": ["The design introduces no new third-party dependency.", "The design does not change how customer data is stored."]}, "documents received": ["Proposed architecture diagram for design document UC-75490, dated 21 December 2025. Single page.", "Cost estimate sheet for design document UC-75490, dated 20 February 2026. 2 pages, complete.", "Problem statement page for design document UC-75490, dated 19 March 2026. 2 pages, complete.", "Security threat model for design document UC-75490, dated 3 January 2026. 4 pages, complete.", "Migration and rollout plan for design document UC-75490, dated 22 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-50", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 742}} {"id": "isc-te-00490-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravness Group", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "14 July 2026"}, "checklist": ["Fire safety certificate: valid (not expired) on the date of the review", "Floor load capacity report: signed", "Utilities connection certificate", "Signed lease agreement: signed"], "submission": {"case": {"name": "warehouse MI-17904", "reference": "DQ-47245"}, "cover note": "Please review the attached pack for warehouse MI-17904, reference DQ-47245. I am not sure everything needed is there, so let me know if anything else is required. Michael Aldett", "documents received": ["utilities_connection_certificate_MI-17904.pdf — Utilities connection certificate for warehouse MI-17904. Date of issue: 2 May 2026. Single page.", "fire_safety_certificate_MI-17904.pdf — Fire safety certificate for warehouse MI-17904. Expiry date: 1 January 2027. 2 pages, complete.", "floor_load_capacity_report_MI-17904.pdf — Floor load capacity report for warehouse MI-17904. Date of issue: 18 April 2026. 3 pages, complete. Signed by the structural engineer.", "signed_lease_agreement_MI-17904.pdf — Signed lease agreement for warehouse MI-17904. Date of issue: 14 June 2026. 8 pages, complete. Signed by the landlord and the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 741}} {"id": "isc-te-00478-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Aldlund GmbH", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "9 September 2026"}, "checklist": ["Impact assessment on the team, signed", "Line manager opinion note, issued within the last 2 months, signed", "Previous flexible working requests record, issued within the last 24 months", "Flexible working request form, signed"], "submission": {"case": {"name": "Adaeze Tibescu", "reference": "CU-27722"}, "documents received": ["flexible_working_request_form_adaeze_tibescu_unsigned.pdf - Flexible working request form regarding Adaeze Tibescu, dated 30 June 2026. 3 pages, complete. The signature line is empty; the form is not signed.", "trial_period_proposal_adaeze_tibescu.pdf - Trial period proposal regarding Adaeze Tibescu, dated 9 July 2026. 1 page. Signed by the line manager.", "line_manager_opinion_note_adaeze_tibescu.pdf - Line manager opinion note regarding Adaeze Tibescu, dated 3 August 2026. 2 pages, complete. Signed by the line manager.", "impact_assessment_team_adaeze_tibescu.pdf - Impact assessment on the team regarding Adaeze Tibescu, dated 23 May 2026. 3 pages, complete. Signed by the line manager.", "previous_flexible_working_requests_record_adaeze_tibescu.pdf - Previous flexible working requests record regarding Adaeze Tibescu, dated 12 October 2024. 1 page."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 745}} {"id": "isc-te-00229-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Boltmont Ltd", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "15 May 2026"}, "checklist": ["Audit agenda (signed)", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary (issued within the last 3 months, signed)", "Layout tour plan (signed)", "Document control list (issued within the last 3 months, signed)", "Training matrix extract (issued within the last 3 months, signed)", "Audit scope statement (signed)"], "submission": {"case": {"name": "customer audit visit RD-78940", "reference": "ER-54632"}, "cover note": "I am not sure that everything needed is in the pack, so please check it before we go ahead.", "documents received": ["RD-78940_calibration_status_summary.pdf — Calibration status summary for customer audit visit RD-78940. Date of issue: 13 May 2026. 2 pages, complete. Signed by the Calibration Technician.", "RD-78940_document_control_list.pdf — Document control list for customer audit visit RD-78940. Date of issue: 14 March 2026. 4 pages, complete. Signed by the Document Control Coordinator.", "RD-78940_layout_tour_plan.pdf — Layout tour plan for customer audit visit RD-78940. Date of issue: 22 March 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_audit_scope_statement.pdf — Audit scope statement for customer audit visit RD-78940. Date of issue: 5 March 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_audit_agenda.pdf — Audit agenda for customer audit visit RD-78940. Date of issue: 28 February 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_training_matrix_extract.pdf — Training matrix extract for customer audit visit RD-78940. Date of issue: 9 March 2026. 3 pages, complete. Signed by the Human Resources Coordinator.", "RD-78940_sub-tier_supplier_records_summary.pdf — Sub-tier supplier records summary for customer audit visit RD-78940. Date of issue: 12 March 2026. 3 pages, complete. Signed by the Purchasing Coordinator."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 961}} {"id": "isc-te-00348-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Ilvmark Group", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "10 March 2026"}, "checklist": ["Check the pack contains a goodwill gesture approval note issued within the last 1 months and signed.", "If the complaint alleges a member of staff behaved rudely, also check the pack contains a staff member written response, signed.", "Check the pack contains a customer contact log issued within the last 3 months.", "If the complaint involves a data protection concern, also check the pack contains a data protection impact note issued within the last 1 months and signed.", "Check the pack contains a store incident report issued within the last 3 months and signed.", "Check the pack contains a complaint escalation form issued within the last 1 months and signed."], "submission": {"case": {"name": "escalated complaint HX-18721", "reference": "QF-35170", "details": ["The complaint alleges a member of staff behaved rudely.", "The complaint involves a data protection concern."]}, "documents received": ["Customer contact log HX-18721 (pages 1 to 3).pdf. This customer contact log about escalated complaint HX-18721 is dated 27 January 2026. It contains pages 1 to 3, and the total number of pages is not shown anywhere on it.", "Original complaint record HX-18721.pdf. This original complaint record about escalated complaint HX-18721 is dated 14 December 2025. It has 2 pages, complete.", "Goodwill gesture approval note HX-18721.pdf. This goodwill gesture approval note about escalated complaint HX-18721 is dated 8 March 2026. It is a single page and carries the signature of the customer relations manager.", "Staff member written response HX-18721.pdf. This staff member written response about escalated complaint HX-18721 is dated 6 February 2026. It is a single page and is signed by the staff member who wrote it.", "Store incident report HX-18721.pdf. This store incident report about escalated complaint HX-18721 is dated 3 February 2026. It has 2 pages, complete, and is signed by the store manager.", "Data protection impact note HX-18721.pdf. This data protection impact note about escalated complaint HX-18721 is dated 28 February 2026. It has 2 pages, complete, and is signed by the data protection officer.", "Complaint escalation form HX-18721.pdf. This complaint escalation form about escalated complaint HX-18721 is dated 7 March 2026. It has 2 pages, complete, and is signed by the case handler."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1026}} {"id": "isc-te-00493-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Delvlund GmbH", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "6 August 2026"}, "checklist": ["Check that the signed credit terms agreement is included and signed.", "Check that the personal guarantee is included and signed.", "Check that the company registration certificate is included.", "Check that the bank reference letter is included, was issued within the last 6 months, and is signed.", "Check that the trade references letter is included, was issued within the last 3 months, and is signed.", "Check that the credit reference agency report is included and was issued within the last 3 months."], "submission": {"case": {"name": "Haskhurst Limited", "reference": "ZB-88049"}, "documents received": ["Trade references letter - Haskhurst Limited.pdf. Dated 22 July 2026, this trade references letter concerns Haskhurst Limited and is signed by the trade referee. 1 page.", "Signed credit terms agreement - Haskhurst Limited.pdf. Dated 7 June 2026, this signed credit terms agreement concerns Haskhurst Limited and is signed by the company's managing director. 4 pages, complete.", "Company registration certificate - Haskhurst Limited.pdf. Dated 20 April 2026, this company registration certificate concerns Haskhurst Limited. 2 pages, complete.", "Personal guarantee - Haskhurst Limited.pdf. Dated 27 May 2026, this personal guarantee concerns Haskhurst Limited and is signed by the guarantor. 2 pages, complete.", "Bank reference letter - Haskhurst Limited.pdf. Dated 3 August 2026, this bank reference letter concerns Haskhurst Limited and is a single page. The area where the signature would be is covered by a sticky note, so it cannot be seen whether the letter is signed.", "Credit reference agency report - Haskhurst Limited.pdf. Dated 18 July 2026, this credit reference agency report concerns Haskhurst Limited. 6 pages, complete."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 639}} {"id": "isc-te-00483-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Maldwater plc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "9 June 2026"}, "checklist": ["Signed witness statement from a staff member", "Incident report from the day, issued within the last 3 months and signed", "Staff training record for the duty manager, issued within the last 24 months and signed", "CCTV footage stills of the incident, issued within the last 3 months", "Signed liability claim form", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed", "Photographs of the spillage on the floor, issued within the last 1 months", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed"], "submission": {"case": {"name": "Varnlund GmbH", "reference": "JH-79417", "details": ["The customer is handling the claim personally.", "The injured customer did not go to hospital."]}, "documents received": ["Staff training record for the duty manager - Varnlund GmbH.pdf. A training record for the duty manager at Varnlund GmbH, dated 29 March 2026, 2 pages, complete. It is signed by the store manager.", "Liability claim form - Varnwarf.pdf. A claim form about Varnlund GmbH, dated 13 May 2026, 3 pages, complete. It is signed by the injured customer.", "CCTV footage stills of the incident - Varnlund GmbH.pdf. Stills of the incident at Varnlund GmbH, dated 27 March 2026, 2 pages, complete.", "Photographs of the spillage on the floor - Varnlund GmbH.pdf. A single page of photographs of the spillage on the floor at Varnlund GmbH, dated 1 June 2026.", "Witness statement from a staff member - Varnlund GmbH.pdf. A single-page statement about Varnlund GmbH, dated 27 May 2026. It is signed by the staff member who witnessed the incident.", "Incident report from the day - Varnlund GmbH.pdf. An incident report about Varnlund GmbH, dated 10 May 2026, 2 pages, complete. It is signed by the duty manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "partial", "defect": "signed", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 911}} {"id": "isc-te-00462-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Xanholm LLP", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "17 August 2026"}, "checklist": ["Account statement showing recent activity, issued within the last 1 months", "Photo identification, valid (not expired) on the date of the review", "Fraud questionnaire, signed", "Card replacement request form, signed", "Confirmation of contact details, issued within the last 3 months", "Lost card declaration, signed"], "submission": {"case": {"name": "Rory Tibow", "reference": "DN-27132"}, "documents received": ["Card replacement request form.pdf. This card replacement request form for Rory Tibow is dated 25 May 2026. 2 pages, complete. It is signed by the cardholder.", "Photo identification.pdf. This photo identification for Rory Tibow shows an expiry date of 16 October 2027. It is a single page.", "Fraud questionnaire.pdf. This fraud questionnaire for Rory Tibow is dated 8 July 2026. 2 pages, complete. It is signed by the cardholder.", "Confirmation of contact details.pdf. This confirmation of contact details for Rory Tibow is dated 28 May 2026. It is a single page.", "Lost card declaration.pdf. This lost card declaration for Rory Tibow is dated 26 June 2026. It is a single page. It is signed by the cardholder.", "Delivery address confirmation.pdf. This delivery address confirmation for Rory Tibow is dated 12 May 2026. It is a single page. It is signed by the cardholder.", "Account statement showing recent activity.pdf. This account statement showing recent activity for Rory Tibow is dated 7 August 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine whether the checklist is fully satisfied by the pack. Go over every checklist line that applies to this case. A required document counts only when it is the kind of document the checklist lists (not merely a similar one), when it is about the case's subject, when it has all its pages, when it is signed wherever the checklist asks for a signature, when it has not expired as of the review date, and when it was issued within the period the checklist allows. Only if its circumstance holds for the case does a conditional line apply. complete: each applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example because a needed date, signature or page count is not visible, because a document's kind cannot be told, or because the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves are what you must judge.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-53", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 805}} {"id": "isc-te-00339-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Pellwood Ltd", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "4 May 2026"}, "checklist": ["Medical examination certificate, issued within the last 6 months and signed.", "Right to work share code printout, issued within the last 3 months.", "Licence application form, signed.", "If the applicant has lived at an address outside the country in the last five years, also: criminal record certificate from overseas, issued within the last 3 months.", "Photo driving licence, valid (not expired) on the date of the review.", "Passport style photograph, issued within the last 6 months."], "submission": {"case": {"name": "Manon Pimingham", "reference": "YV-79327"}, "documents received": ["Photo driving licence for Manon Pimingham. Expiry date 1 July 2027. 2 pages, complete.", "Knowledge test pass certificate for Manon Pimingham. Dated 19 February 2026. Single page.", "Driver declaration of convictions for Manon Pimingham. Dated 29 January 2026. Single page. Signed by the driver.", "Licence application form for Manon Pimingham. Dated 11 January 2026. 6 pages, complete. Signed by the applicant.", "Passport style photograph for Manon Pimingham. Dated 9 December 2025. Single page.", "Criminal record certificate from overseas for Manon Pimingham. Dated 14 March 2026. 4 pages, complete.", "Medical examination certificate for Manon Pimingham. Dated 15 December 2025. 2 pages, complete. Signed by the examining doctor.", "Right to work share code printout for Manon Pimingham. Dated 30 April 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00106-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Faldmark Ltd", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "6 April 2026"}, "checklist": ["Obtain the product catalogue declaration, signed.", "Obtain proof of trading address, issued within the last 3 months.", "If the seller is a sole trader rather than a company, also obtain the sole trader statutory declaration, signed.", "Obtain the authorised representative ID copy, valid (not expired) on the date of the review.", "Obtain the business registration certificate.", "Obtain the tax registration letter.", "If the seller intends to list food or cosmetic products, also obtain the safety compliance certificate, issued within the last 12 months."], "submission": {"case": {"name": "Kestcombe LLP", "reference": "JX-13298", "details": ["The seller is a sole trader rather than a company.", "The seller does not intend to list food or cosmetic products."]}, "documents received": ["product_catalogue_declaration_KestcombeLLP.pdf — Product catalogue declaration for Kestcombe LLP, dated 7 January 2026. 4 pages, complete. It is signed by an authorised signatory of Kestcombe LLP.", "authorised_representative_ID_copy_KestcombeLLP.pdf — Authorised representative ID copy for Kestcombe LLP, showing an expiry date of 8 July 2028. 1 page.", "tax_return_receipt_KestcombeLLP.pdf — Tax return receipt for Kestcombe LLP, dated 23 March 2026. 1 page.", "sole_trader_statutory_declaration_KestcombeLLP.pdf — Sole trader statutory declaration for Kestcombe LLP, dated 26 December 2025. 1 page. It is signed by the declarant, the sole trader of Kestcombe LLP.", "business_registration_certificate_KestcombeLLP.pdf — Business registration certificate for Kestcombe LLP, dated 10 March 2026. 1 page.", "proof_of_trading_address_KestcombeLLP.pdf — Proof of trading address for Kestcombe LLP, dated 28 February 2026. 1 page.", "anti_money_laundering_questionnaire_KestcombeLLP.pdf — Anti-money laundering questionnaire for Kestcombe LLP, dated 25 December 2025. 3 pages, complete. It is signed by an authorised signatory of Kestcombe LLP."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 908}} {"id": "isc-te-00168-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Esklock Group", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "9 April 2026"}, "checklist": ["Go-live sign-off certificate, issued within the last 1 months, signed.", "Payment gateway technical specification.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review.", "Penetration test summary, issued within the last 6 months, signed.", "Fraud screening configuration sheet, signed."], "submission": {"case": {"name": "payment gateway UC-28398", "reference": "VH-98812", "details": ["The gateway will store customers' card details."]}, "documents received": ["Payment gateway technical specification for payment gateway UC-28398. Date of issue: 27 March 2026. Pages 1 to 2 are included; the total number of pages is not shown anywhere.", "Test environment transaction log for payment gateway UC-28398. Date of issue: 6 April 2026. 4 pages, complete.", "Go-live sign-off certificate for payment gateway UC-28398. Date of issue: 5 April 2026. 1 page, signed by the Head of Payments Operations.", "Card storage compliance certificate for payment gateway UC-28398. Expiry date: 17 July 2027. 2 pages, complete.", "Penetration test summary for payment gateway UC-28398. Date of issue: 28 December 2025. 3 pages, complete. Signed by the IT Security Test Lead.", "Fraud screening configuration sheet for payment gateway UC-28398. Date of issue: 28 December 2025. 1 page, signed by the Fraud Screening Analyst."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00155-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Elvham Group", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "6 May 2026"}, "checklist": ["If the applicant has lived at an address outside the country in the last five years, also: criminal record certificate from overseas (issued within the last 3 months)", "If the applicant is applying for a hackney carriage licence rather than private hire, also: vehicle specification sheet for the hackney carriage", "Criminal record check (issued within the last 3 months)", "Right to work share code printout (issued within the last 3 months)", "Licence application form (signed)", "Driver declaration of convictions (signed)"], "submission": {"case": {"name": "Orla Bramwick", "reference": "PX-75567", "details": ["The applicant has lived at the same address in the country for the last five years.", "The applicant is applying for a hackney carriage licence rather than private hire."]}, "documents received": ["Criminal record check - Orla Bramwick. Date of issue: 2 May 2026. 6 pages, complete.", "Right to work share code printout - Orla Bramwick. Date of issue: 5 March 2026. Single page.", "Driver declaration of convictions - Orla Bramwick. Date of issue: 27 February 2026. Single page. Signed by the driver.", "Vehicle specification sheet for the hackney carriage - Orla Bramwick. Date of issue: 17 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 2, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 726}} {"id": "isc-te-00292-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Elvcombe Group", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "17 June 2026"}, "checklist": ["Furniture inventory list, issued within the last 1 months and signed", "Movers insurance certificate, valid (not expired) on the date of the review", "If the move includes taking furniture to a storage unit, also: storage unit access authorisation, signed", "Signed move plan", "New floor snagging list, issued within the last 1 months and signed", "Parking bay suspension approval, issued within the last 1 months and signed", "Lifting equipment inspection report, issued within the last 6 months and signed"], "submission": {"case": {"name": "office move project BE-20815", "reference": "GI-40044", "details": ["The move includes taking furniture to a storage unit."]}, "documents received": ["snagging-list-BE-20815-20-04-25.pdf - New floor snagging list for office move project BE-20815, dated 20 April 2025. 3 pages, complete. Signed by the new floor site manager.", "snagging-list-BE-20815-03-06.pdf - New floor snagging list for office move project BE-20815, dated 3 June 2026. 3 pages, complete. Signed by the new floor site manager.", "lifting-inspection-BE-20815.pdf - Lifting equipment inspection report for office move project BE-20815, dated 21 March 2026. 2 pages, complete. Signed by the lifting equipment inspector.", "move-plan-BE-20815.pdf - Signed move plan for office move project BE-20815, dated 10 April 2026. 6 pages, complete. Signed by the move project manager.", "storage-access-BE-20815.pdf - Storage unit access authorisation for office move project BE-20815, dated 5 June 2026. Single page. Signed by the storage unit site manager.", "parking-suspension-BE-20815.pdf - Parking bay suspension approval for office move project BE-20815, dated 9 June 2026. Single page. Signed by the local highways authority officer.", "furniture-inventory-BE-20815.pdf - Furniture inventory list for office move project BE-20815, dated 28 May 2026. 4 pages, complete. Signed by the facilities manager.", "movers-insurance-BE-20815.pdf - Movers insurance certificate for office move project BE-20815. Shows an expiry date of 24 September 2027. Single page."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-72", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1029}} {"id": "isc-te-00040-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Delvham BV", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "12 May 2026"}, "checklist": ["Seal number log, issued within the last 1 months and signed", "Load consolidation sheet, issued within the last 3 months and signed", "Cross-dock slot booking sheet, issued within the last 1 months and signed", "Outbound loading record, issued within the last 1 months and signed"], "submission": {"case": {"name": "cross-dock transfer QC-37927", "reference": "WU-40761"}, "cover note": "I am not sure everything needed is included in this pack. Please take a look and let me know if anything else should be added.", "documents received": ["Transfer manifest for cross-dock transfer QC-37927, dated 23 April 2026. 3 pages, complete, signed by the transfer coordinator.", "Outbound loading record for cross-dock transfer QC-37927, dated 29 April 2026. Single page, signed by the outbound loading supervisor.", "Load consolidation sheet for cross-dock transfer QC-37927, dated 9 March 2026. 2 pages, complete, signed by the load planner.", "Seal number log for cross-dock transfer QC-37927, dated 2 May 2026. Single page, signed by the dispatch supervisor.", "Cross-dock slot booking sheet for cross-dock transfer QC-37927, dated 26 April 2026. Single page, signed by the slot booking coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 747}} {"id": "isc-te-00378-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Raskgate GmbH", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "1 July 2026"}, "checklist": ["Check that the pack contains a fraud screening result sheet issued within the last 3 months.", "Check that the pack contains a terms of sale acceptance log issued within the last 12 months.", "If the customer claims the item was not as described, also check that the pack contains a product description screenshot archive issued within the last 6 months.", "Check that the pack contains a customer order history extract issued within the last 6 months.", "Check that the pack contains a transaction record printout issued within the last 3 months.", "Check that the pack contains a signature proof of delivery issued within the last 6 months and signed.", "Check that the pack contains a chargeback response form signed."], "submission": {"case": {"name": "disputed transaction VF-44059", "reference": "UL-78187", "details": ["The customer claims the item was not as described."]}, "documents received": ["Terms of sale acceptance log for disputed transaction VF-44059, dated 11 August 2025. Scanned document, 1 page.", "Product description screenshot archive for disputed transaction VF-44059, dated 12 April 2026. 2 pages, complete.", "Customer order history extract for disputed transaction VF-44059, dated 25 April 2026. 2 pages, complete.", "Signature proof of delivery for disputed transaction VF-44059, dated 24 February 2026. The signature line is empty, so it is not signed. Scanned document, 1 page.", "Fraud screening result sheet for disputed transaction VF-44059, dated 28 June 2026. Scanned document, 1 page.", "Chargeback response form for disputed transaction VF-44059, dated 15 June 2026, signed by the payments disputes team lead. 2 pages, complete.", "Customer account details page for disputed transaction VF-44059, dated 9 June 2026. Scanned document, 1 page.", "Transaction record printout for disputed transaction VF-44059, dated 20 June 2026. Scanned document, 1 page."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 716}} {"id": "isc-te-00013-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Bravston Partners", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "18 September 2026"}, "checklist": ["Shareholder register extract, issued within the last 3 months.", "Proof of registered office address, issued within the last 3 months.", "If the company operates in a cash-intensive trade, also: cash handling policy, signed.", "Board resolution to open the account, signed.", "Company tax registration certificate.", "Company statutes, signed."], "submission": {"case": {"name": "Weskberg BV", "reference": "CW-58097", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["Company statutes - Weskberg BV.pdf — Company statutes for Weskberg BV, dated 4 August 2026. Pages 1-4 of 12 are included. It is signed by the managing director.", "Board resolution to open the account - Weskberg BV.pdf — Board resolution to open the account for Weskberg BV, dated 28 May 2026. 1 page. It is signed by the members of the board.", "Shareholder register extract - Weskberg BV.pdf — Shareholder register extract for Weskberg BV, dated 17 August 2026. 2 pages, complete.", "Proof of registered office address - Weskberg BV.pdf — Proof of registered office address for Weskberg BV, dated 25 July 2026. 1 page.", "Company tax registration certificate - Weskberg BV.pdf — Company tax registration certificate for Weskberg BV, dated 4 August 2026. 1 page.", "Cash handling policy - Weskberg BV.pdf — Cash handling policy for Weskberg BV, dated 2 July 2026. 2 pages, complete. It carries the signature of the managing director."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Work through every checklist line that applies to this case one by one. For a required document to count, it must be the exact kind of document listed (not a similar one), be about the subject of the case, contain all its pages, be signed where the checklist asks for a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line only applies when its circumstance holds for the case. complete: all applicable lines are met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-68", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00297-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Kaldlock BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "21 July 2026"}, "checklist": ["Written grievance statement, signed", "Witness list, signed", "Adjustment request record, issued within the last 3 months, signed", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed", "Evidence bundle index, signed", "Grievance procedure acknowledgement, issued within the last 3 months, signed"], "submission": {"case": {"name": "Hannah Kerrmore", "reference": "SB-29513", "details": ["The grievance is against the employee's direct manager."]}, "documents received": ["Written grievance statement about Hannah Kerrmore. Dated 26 April 2026. 3 pages, complete. Signed by the complaining employee, Hannah Kerrmore.", "Adjustment request record about Hannah Kerrmore. Dated 6 July 2026. Single page. Signed by the HR case handler.", "Evidence bundle index about Hannah Kerrmore. Dated 9 July 2026. 2 pages, complete. Signed by the HR case handler.", "Grievance procedure acknowledgement about Hannah Kerrmore. Dated 20 June 2025. Single page. Signed by the complaining employee, Hannah Kerrmore.", "Meeting invitation with rights explained about Hannah Kerrmore. Dated 15 July 2026. Single page.", "Witness list about Hannah Kerrmore. Dated 21 April 2026. Single page. Signed by the complaining employee, Hannah Kerrmore.", "Alternative manager reporting line note about Hannah Kerrmore. Dated 16 May 2026. Single page. Signed by the HR case handler.", "Previous grievance outcome letter about Hannah Kerrmore. Dated 2 August 2024. 2 pages, complete.", "Grievance procedure acknowledgement about Hannah Kerrmore. Dated 29 April 2026. Single page. Signed by the complaining employee, Hannah Kerrmore."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "variant-6", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00185-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Merslock & Co", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "25 March 2026"}, "checklist": ["Fixed asset register extract for the asset", "Sales invoice or receipt for the sale proceeds, issued within the last 3 months", "If the asset is being sold rather than scrapped, also: proof of payment received from the buyer, issued within the last 3 months", "Asset disposal request form, signed", "Written offer or valuation for the asset, issued within the last 6 months", "If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer, issued within the last 3 months", "Depreciation schedule for the asset to date", "Asset de-registration and tag removal record, signed"], "submission": {"case": {"name": "disposed asset JI-91007", "reference": "ER-48676", "details": ["The asset is being sold rather than scrapped.", "The asset is not a company car being part-exchanged."]}, "documents received": ["Proof_of_payment_received_from_buyer_JI-91007.pdf: A proof of payment received from the buyer relating to disposed asset JI-91007. It is dated 2 March 2026 and is a single page.", "Sales_invoice_or_receipt_JI-91007.pdf: A sales invoice or receipt for the sale proceeds relating to disposed asset JI-91007. It is dated 28 February 2026 and is a single page.", "Asset_de-registration_and_tag_removal_record_JI-91007.pdf: An asset de-registration and tag removal record relating to disposed asset JI-91007, dated 6 February 2026. It is a single page and is signed by the group financial controller.", "Asset_disposal_request_form_JI-91007.pdf: An asset disposal request form relating to disposed asset JI-91007, dated 6 December 2025. All 2 of its 2 pages are included, 2 pages, complete. It is signed by the group financial controller.", "Fixed_asset_register_extract_JI-91007.pdf: A fixed asset register extract for the asset relating to disposed asset JI-91007. It is dated 9 January 2026 and is a single page.", "Profit_or_loss_on_disposal_calculation_JI-91007.pdf: A profit or loss on disposal calculation relating to disposed asset JI-91007, dated 12 January 2026. It is a single page and is signed by the group financial controller.", "Written_offer_or_valuation_JI-91007.pdf: A written offer or valuation for the asset relating to disposed asset JI-91007, dated 2 January 2026. All 2 of its 2 pages are included, 2 pages, complete.", "Depreciation_schedule_JI-91007.pdf: A depreciation schedule for the asset to date relating to disposed asset JI-91007, dated 17 March 2026. All 2 of its 2 pages are included, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1120}} {"id": "isc-te-00017-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Yondgate Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "19 August 2026"}, "checklist": ["Check that the pack contains a prerequisite certificate.", "Check that the pack contains venue access instructions issued within the last 3 months.", "Check that the pack contains an employer sponsorship letter issued within the last 3 months and signed.", "Check that the pack contains payment confirmation issued within the last 3 months."], "submission": {"case": {"name": "course booking CC-42557", "reference": "LU-53975"}, "documents received": ["prerequisite_certificate_CC-42557.pdf. Prerequisite certificate for course booking CC-42557. It shows its date of issue as 9 August 2026 and is a single page.", "payment_confirmation_CC-42557_20260731.pdf. Payment confirmation for course booking CC-42557. It shows its date of issue as 31 July 2026 and is a single page.", "special_requirements_note_CC-42557_20260519.pdf. Special requirements note for course booking CC-42557. It shows its date of issue as 19 May 2026 and is a single page.", "employer_sponsorship_letter_CC-42557_20260630.pdf. Employer sponsorship letter for course booking CC-42557. It shows its date of issue as 30 June 2026 and is a single page. It is signed by the employer's authorising signatory.", "venue_access_instructions_CC-42557_20260529.pdf. Venue access instructions for course booking CC-42557. It shows its date of issue as 29 May 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00472-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lombcliff Partners", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "3 August 2026"}, "checklist": ["Risk assessment for the task, issued within the last 3 months and signed.", "Cost estimate, issued within the last 3 months and signed.", "If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Access authorisation slip, signed.", "Photographs of the fault, issued within the last 3 months.", "Parts order confirmation, issued within the last 1 months."], "submission": {"case": {"name": "maintenance request XO-61833", "reference": "IR-85731", "details": ["The job involves no work at height above two metres."]}, "documents received": ["Job request form for maintenance request XO-61833, dated 16 July 2026. Single page. Signed by the requesting manager.", "Photographs of the fault for maintenance request XO-61833, dated 19 July 2026. 2 pages, complete.", "Cost estimate for maintenance request XO-61833, dated 1 June 2026. 2 pages, complete. Signed by the estimating officer.", "Access authorisation slip for maintenance request XO-61833, dated 6 July 2026. Single page. Signed by the access controller.", "Parts order confirmation for maintenance request XO-61833. The date of issue is covered by a stamp. Single page.", "Risk assessment for the task on maintenance request XO-61833, dated 4 June 2026. 5 pages, complete. Signed by the assessing supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 775}} {"id": "isc-te-00483-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Maldwater plc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "9 June 2026"}, "checklist": ["Signed witness statement from a staff member", "Incident report from the day, issued within the last 3 months and signed", "Staff training record for the duty manager, issued within the last 24 months and signed", "CCTV footage stills of the incident, issued within the last 3 months", "Signed liability claim form", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed", "Photographs of the spillage on the floor, issued within the last 1 months", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed"], "submission": {"case": {"name": "Varnlund GmbH", "reference": "JH-79417", "details": ["The customer is handling the claim personally.", "The injured customer did not go to hospital."]}, "documents received": ["Photographs of the spillage on the floor - Varnlund GmbH.pdf. A single page of photographs of the spillage on the floor at Varnlund GmbH, dated 1 June 2026.", "Witness statement from a staff member - Varnlund GmbH.pdf. A single-page statement about Varnlund GmbH, dated 27 May 2026. It is signed by the staff member who witnessed the incident.", "Incident report from the day - Varnlund GmbH.pdf. An incident report about Varnlund GmbH, dated 10 May 2026, 2 pages, complete. Its signature line is empty: it is not signed.", "CCTV footage stills of the incident - Varnlund GmbH.pdf. Stills of the incident at Varnlund GmbH, dated 27 March 2026, 2 pages, complete.", "Liability claim form - Varnwarf.pdf. A claim form about Varnlund GmbH, dated 13 May 2026, 3 pages, complete. It is signed by the injured customer.", "Staff training record for the duty manager - Varnlund GmbH.pdf. A training record for the duty manager at Varnlund GmbH, dated 29 March 2026, 2 pages, complete. It is signed by the store manager."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist. Work through every checklist line that applies to this case. Only a document that is the kind listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows counts as satisfying a required document. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "partial", "defect": "not signed", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-48", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 923}} {"id": "isc-te-00438-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Halvmont GmbH", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "15 April 2026"}, "checklist": ["If the gateway will handle recurring subscription payments, also: subscription billing mandate template (signed)", "go-live sign-off certificate (issued within the last 1 months, signed)", "If the gateway will store customers' card details, also: card storage compliance certificate (valid (not expired) on the date of the review)", "merchant account agreement (signed)", "data protection impact assessment (issued within the last 12 months, signed)", "fraud screening configuration sheet (signed)"], "submission": {"case": {"name": "payment gateway QZ-24811", "reference": "HL-76895", "details": ["The gateway will not handle recurring subscription payments.", "The gateway will not store customers' card details."]}, "documents received": ["File scan_ref_0192.pdf: the file will not open, so its contents cannot be seen.", "Go-live sign-off certificate for payment gateway QZ-24811, dated 28 March 2026. Single page, signed by the IT security lead.", "Test environment transaction log for payment gateway QZ-24811, dated 29 March 2026. 4 pages, complete.", "Data protection impact assessment for payment gateway QZ-24811, dated 8 September 2025. 5 pages, complete, signed by the data protection officer.", "Merchant account agreement for payment gateway QZ-24811, dated 31 December 2025. 6 pages, complete, signed by the merchant account manager.", "Fraud screening configuration sheet for payment gateway QZ-24811, dated 20 February 2026. Single page, signed by the fraud screening analyst.", "Payment gateway technical specification for payment gateway QZ-24811, dated 22 February 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 833}} {"id": "isc-te-00340-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Eskness Limited", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "25 March 2026"}, "checklist": ["Training needs assessment (signed)", "Vendor quotation (issued within the last 3 months)", "Equipment purchase request form (signed)", "Three quotes comparison sheet (issued within the last 3 months, signed)", "Cost-benefit justification"], "submission": {"case": {"name": "equipment NP-85998", "reference": "KG-36968"}, "documents received": ["Grant fund eligibility note - NP-85998.pdf - Grant fund eligibility note for equipment NP-85998, dated 15 January 2026. 1 page. Signed by the grants officer.", "Three quotes comparison sheet - NP-85998.pdf - Three quotes comparison sheet for equipment NP-85998, dated 11 March 2026. 1 page. Signed by the procurement lead.", "Training needs assessment - NP-85998.pdf - Training needs assessment for equipment NP-85998, dated 7 December 2025. 1 page. Signed by the department head.", "Cost-benefit justification - NP-85998.pdf - Cost-benefit justification for equipment NP-85998, dated 13 March 2026. 3 pages, complete.", "Vendor quotation - NP-85998.pdf - Vendor quotation for equipment NP-85998, dated 8 February 2026. 2 pages, complete.", "Equipment purchase request form - NP-85998.pdf - Equipment purchase request form for equipment NP-85998, dated 19 March 2026. 2 pages, complete. Signed by the requesting department manager."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Consider every checklist line that applies to this case. A required document counts only when it is the kind of document listed (not a similar one), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it has not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-4", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 792}} {"id": "isc-te-00362-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Dornham Ltd", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "27 July 2026"}, "checklist": ["Leaver notification form, signed.", "Equipment return receipt, issued within the last 1 months, signed.", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed.", "Final payroll cut-off note, issued within the last 1 months, signed.", "Service desk ticket closure summary, issued within the last 1 months.", "Shared mailbox handover record, issued within the last 1 months, signed.", "Non-disclosure reminder acknowledgement, signed."], "submission": {"case": {"name": "Niamh Gillock", "reference": "GB-48986", "details": ["The leaver held no privileged administrator accounts."]}, "documents received": ["A leaver notification form for Niamh Gillock, dated 3 May 2026. 2 pages, complete. Signed by the line manager.", "An equipment return receipt for Niamh Gillock. The date of issue is covered by a stamp. Single page. Signed by the receiving IT asset officer.", "A non-disclosure reminder acknowledgement for Niamh Gillock, dated 19 April 2026. Single page. Signed by Niamh Gillock.", "A shared mailbox handover record for Niamh Gillock, dated 23 July 2026. 2 pages, complete. Signed by the incoming mailbox owner.", "A service desk ticket closure summary for Niamh Gillock, dated 10 July 2026. 3 pages, complete.", "A final payroll cut-off note for Niamh Gillock, dated 16 July 2026. Single page. Signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 786}} {"id": "isc-te-00065-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Xanton LLP", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "29 June 2026"}, "checklist": ["Recent bank statements issued within the last 3 months.", "Capacity assessment record, signed.", "Benefit entitlement letters issued within the last 12 months.", "Support plan, signed."], "submission": {"case": {"name": "Jack Knoxaker", "reference": "YE-59569"}, "documents received": ["Support plan. Support plan for Jack Knoxaker, issued on 4 May 2026. 6 pages, complete. Signed by the lead social worker.", "Capacity assessment record. Capacity assessment record for Jack Knoxaker, issued on 1 March 2026. 4 pages, complete. Signed by the assessing social worker.", "Benefit entitlement letters. Benefit entitlement letters for Jack Knoxaker, issued on 27 October 2025. 2 pages, complete.", "Bank statements. Recent bank statements for Jack Knoxaker, issued on 23 April 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 626}} {"id": "isc-te-00109-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Veymere SAS", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "14 April 2026"}, "checklist": ["If the seller intends to list food or cosmetic products, also provide: safety compliance certificate (issued within the last 12 months)", "proof of trading address (issued within the last 3 months)", "product catalogue declaration (signed)", "authorised representative ID copy (valid (not expired) on the date of the review)", "business registration certificate", "returns policy statement (signed)"], "submission": {"case": {"name": "Ulmmore Ltd", "reference": "UN-41460", "details": ["The seller intends to list food or cosmetic products."]}, "documents received": ["Proof of trading address - Ulmmore Ltd.pdf. A proof of trading address for Ulmmore Ltd, dated 16 February 2026. Single page.", "Product catalogue declaration - Ulmmore Ltd.pdf. A product catalogue declaration for Ulmmore Ltd, dated 19 March 2026. 4 pages, complete. Signed by the managing director.", "Anti-money laundering questionnaire - Ulmmore Ltd.pdf. An anti-money laundering questionnaire for Ulmmore Ltd, dated 20 February 2026. 3 pages, complete. Signed by the finance director.", "Business registration certificate - Ulmmore Ltd.pdf. A business registration certificate for Ulmmore Ltd, dated 1 March 2026. Single page.", "Returns policy statement - Ulmmore Ltd.pdf. A returns policy statement for Ulmmore Ltd, dated 27 February 2026. 2 pages, complete. Signed by the operations manager.", "Authorised representative ID copy - Ulmmore Ltd.pdf. An authorised representative ID copy for Ulmmore Ltd showing an expiry date of 12 July 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and determine completeness. Check each checklist line that applies to this case. A required document counts only if it matches the listed document kind (not something similar), deals with the subject of the case, has all pages intact, is signed wherever the checklist calls for a signature, had not expired by the review date, and was issued within the timeframe the checklist permits. A conditional line is applicable only if its circumstance holds for the case. complete: all applicable lines are met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, yet at least one cannot be resolved from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead you; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-8", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 790}} {"id": "isc-te-00126-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Ulmwood Limited", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "7 May 2026"}, "checklist": ["Title information document.", "Asbestos survey report, issued within the last 12 months.", "Signed keys handover receipt.", "Company search report, issued within the last 1 months.", "Signed draft lease.", "Signed stamp duty return."], "submission": {"case": {"name": "premises KE-13480", "reference": "VJ-73666"}, "documents received": ["Title information document for premises KE-13480, dated 29 January 2026. 3 pages, complete.", "Unapproved heads of terms for premises KE-13480, dated 2 February 2026. 12 pages, complete, signed by the landlord and the proposed tenant.", "Keys handover receipt for premises KE-13480, dated 25 February 2026. Single page, signed by the landlord's representative.", "Guarantor consent letter for premises KE-13480, dated 16 February 2026. Single page, signed by the guarantor.", "Stamp duty return for premises KE-13480, dated 7 January 2026. 2 pages, complete, signed by the tenant's solicitor.", "Asbestos survey report for premises KE-13480, dated 20 September 2025. 4 pages, complete.", "Company search report for premises KE-13480, dated 18 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00172-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Ebrwick plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "13 August 2026"}, "checklist": ["Alerting rules review note, issued within the last 3 months", "Root cause analysis report, issued within the last 3 months and signed", "Incident timeline, issued within the last 3 months", "Service level objective breach record, issued within the last 3 months", "Remediation items list, issued within the last 3 months and signed", "Customer impact statement, issued within the last 3 months"], "submission": {"case": {"name": "production incident RZ-3062", "reference": "KV-98742"}, "documents received": ["Remediation items list concerning production incident RZ-3062, dated 26 May 2026. 2 pages, complete. It is signed by the reliability engineering lead.", "Alerting rules review note concerning production incident RZ-3062, dated 23 May 2026. 2 pages, complete.", "Customer impact statement concerning production incident RZ-3062, dated 22 June 2022026. 2 pages, complete.", "Incident timeline concerning production incident RZ-3062, dated 2 June 2026. 3 pages, complete.", "Root cause analysis report concerning production incident RZ-3062, dated 9 June 2026. 5 pages, complete. It is signed by the reliability engineering lead.", "Service level objective breach record concerning production incident RZ-3062, dated 13 June 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 759}} {"id": "isc-te-00038-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Lunwyn Partners", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "8 April 2026"}, "checklist": ["Confirm the cure period expiry calculation is included, that it was issued within the last 1 months, and that it is signed.", "Confirm the termination notice draft is included and that it is signed.", "If the contract requires a dispute to go to mediation first, also: confirm the mediation request confirmation is included, that it was issued within the last 1 months, and that it is signed.", "Confirm the original service agreement copy is included.", "Confirm the breach evidence log is included, that it was issued within the last 1 months, and that it is signed."], "submission": {"case": {"name": "Tarvcombe & Co", "reference": "BI-47555", "details": ["The contract requires a dispute to go to mediation first."]}, "cover note": "This pack has already been checked by a colleague. Please review it in line with our usual process.", "documents received": ["Original service agreement copy for Tarvcombe & Co, dated 24 December 2025, pages 1 to 9 included. The total number of pages is not shown anywhere on the document.", "Breach evidence log for Tarvcombe & Co, dated 23 March 2026, 6 pages, complete. Signed by the disputes case handler.", "Litigation hold notice for Tarvcombe & Co, dated 2 April 2026, 2 pages, complete. Signed by the legal counsel.", "Cure period expiry calculation for Tarvcombe & Co, dated 4 April 2026, 2 pages, complete. Signed by the contract manager.", "Mediation request confirmation for Tarvcombe & Co, dated 23 March 2026, single page. Signed by the mediation case officer.", "Termination notice draft for Tarvcombe & Co, dated 25 January 2026, 2 pages, complete. Signed by the commercial director."]}}, "question": {"type": "choice", "instructions": "You are deciding whether the pack is complete when checked against the checklist. Go through every checklist line that applies to this case. Only if a required document is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows does it count. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves must be judged.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-58", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 837}} {"id": "isc-te-00424-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ambside & Co", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "15 May 2026"}, "checklist": ["visa entry requirement printout, issued within the last 3 months", "flight itinerary quote, issued within the last 1 months", "line manager approval, signed", "If the trip involves travel to a country requiring a visa, also: visa approval letter", "trip cost estimate, signed", "passport copy for international travel, valid (not expired) on the date of the review"], "submission": {"case": {"name": "business trip QQ-26801", "reference": "UK-40834"}, "documents received": ["flight_itinerary_quote_QQ-26801.pdf. This is a flight itinerary quote for business trip QQ-26801, showing a date of issue of 1 May 2026. 2 pages, complete.", "trip_cost_estimate_QQ-26801.pdf. This is a trip cost estimate for business trip QQ-26801, showing a date of issue of 6 April 2026. It is a single page, signed by the travel coordinator.", "passport_copy_QQ-26801.pdf. This is a passport copy for international travel for business trip QQ-26801, showing an expiry date of 19 September 2027. It is a single page.", "visa_entry_requirement_printout_QQ-26801.pdf. This is a visa entry requirement printout for business trip QQ-26801, showing a date of issue of 3 April 2026. 2 pages, complete.", "line_manager_approval_QQ-26801.pdf. This is a line manager approval for business trip QQ-26801, showing a date of issue of 29 January 2026. It is a single page, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 813}} {"id": "isc-te-00290-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Raskmore plc", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "17 March 2026"}, "checklist": ["Photographs of the fault, issued within the last 3 months", "Cost estimate, issued within the last 3 months, signed", "Job request form, signed", "Planned completion date sheet, signed", "Location details sheet"], "submission": {"case": {"name": "maintenance request IW-1228", "reference": "EG-89517"}, "documents received": ["Risk assessment for the task. The assessment concerns maintenance request IW-1228 and shows a date of issue of 29 January 2026. 5 pages, complete. It is signed by the assessor.", "Photographs of the fault. The photographs concern maintenance request IW-1228 and show a date of issue of 2 March 2026. 2 pages, complete.", "Job request form. The form concerns maintenance request IW-1228 and shows a date of issue of 13 February 2026. 1 page. It is signed by the requesting manager.", "Planned completion date sheet. The sheet concerns maintenance request IW-1228 and shows a date of issue of 23 December 2025. 1 page. It is signed by the facilities coordinator.", "Cost estimate. The estimate concerns maintenance request IW-1228 and shows a date of issue of 22 February 2026. 2 pages, complete. It is signed by the estimator."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete when checked against the checklist. Go through each line of the checklist that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-10", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 736}} {"id": "isc-te-00463-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Jorwick & Co", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "5 August 2026"}, "checklist": ["Obtain a shareholder register extract issued within the last 3 months.", "Obtain a signed board resolution to open the account.", "Obtain a signed beneficial owner identification form.", "Obtain a proof of registered office address issued within the last 3 months."], "submission": {"case": {"name": "Kaldvik Inc", "reference": "KZ-84732"}, "documents received": ["board_resolution_Kaldvik_Inc.pdf. Board resolution to open the account for Kaldvik Inc, dated 13 April 2026. Single page, signed by the chair of the board.", "shareholder_register_extract_Kaldvik_Inc.pdf. Shareholder register extract for Kaldvik Inc, dated 21 July 2026. 2 pages, complete.", "certificate_of_incorporation_Kaldvik_Inc.pdf. Certificate of incorporation for Kaldvik Inc, dated 11 June 2026. Single page.", "beneficial_owner_identification_form_Kaldvik_Inc.pdf. Beneficial owner identification form for Kaldvik Inc, dated 31 July 2026. 3 pages, complete, signed by a director.", "proof_of_registered_office_address_Kaldvik_Inc.pdf. Proof of registered office address for Kaldvik Inc, dated 1 August 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 707}} {"id": "isc-te-00013-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Bravston Partners", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "18 September 2026"}, "checklist": ["Shareholder register extract, issued within the last 3 months.", "Proof of registered office address, issued within the last 3 months.", "If the company operates in a cash-intensive trade, also: cash handling policy, signed.", "Board resolution to open the account, signed.", "Company tax registration certificate.", "Company statutes, signed."], "submission": {"case": {"name": "Weskberg BV", "reference": "CW-58097", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["Cash handling policy - Weskberg BV.pdf — Cash handling policy for Weskberg BV, dated 2 July 2026. 2 pages, complete. It carries the signature of the managing director.", "Company statutes - Weskberg BV.pdf — Company statutes for Weskberg BV, dated 4 August 2026. Pages 1-8 are included, and the total number of pages is not shown anywhere. It is signed by the managing director.", "Company tax registration certificate - Weskberg BV.pdf — Company tax registration certificate for Weskberg BV, dated 4 August 2026. 1 page.", "Board resolution to open the account - Weskberg BV.pdf — Board resolution to open the account for Weskberg BV, dated 28 May 2026. 1 page. It is signed by the members of the board.", "Proof of registered office address - Weskberg BV.pdf — Proof of registered office address for Weskberg BV, dated 25 July 2026. 1 page.", "Shareholder register extract - Weskberg BV.pdf — Shareholder register extract for Weskberg BV, dated 17 August 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00388-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Wilmford Inc", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "3 September 2026"}, "checklist": ["Meeting invitation with rights explained — issued within the last 1 month", "Written grievance statement — signed", "Evidence bundle index — signed", "Adjustment request record — issued within the last 3 months and signed"], "submission": {"case": {"name": "Sophie Orvaker", "reference": "RG-91668"}, "documents received": ["RG-91668_evidence_bundle_index.pdf — Evidence bundle index concerning Sophie Orvaker, dated 25 June 2026. 2 pages, complete. Signed by the employee relations team lead.", "RG-91668_adjustment_request_record.pdf — Adjustment request record concerning Sophie Orvaker, dated 26 July 2026. 1 page. Signed by the line manager.", "RG-91668_meeting_invitation_rights_explained.pdf — Meeting invitation with rights explained concerning Sophie Orvaker, dated 23 August 2026. 1 page.", "RG-91668_grievance_procedure_acknowledgement.pdf — Grievance procedure acknowledgement concerning Sophie Orvaker, dated 30 June 2026. 1 page. Signed by the HR case handler.", "RG-91668_written_grievance_statement_unsigned.pdf — Written grievance statement concerning Sophie Orvaker, dated 29 August 2026. 3 pages, complete. The signature line is empty; the document is not signed."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-6", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 744}} {"id": "isc-te-00329-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Orrmark BV", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "8 July 2026"}, "checklist": ["Check that the pack includes a capital gains asset record.", "Check that the pack includes a bank interest statement issued within the last 13 months.", "Check that the pack includes an employment income summary issued within the last 13 months.", "If one household member worked abroad for part of the year, also check that the pack includes a foreign earnings statement issued within the last 13 months.", "Check that the pack includes a gift aid donation summary."], "submission": {"case": {"name": "household tax affairs QR-65635", "reference": "LW-27135", "details": ["No household member worked abroad at any point during the year."]}, "documents received": ["bank_interest_statement_QR-65635.pdf - Bank interest statement for household tax affairs QR-65635. It shows a date of issue of 18 May 2026. 3 pages, complete.", "employment_income_summary_QR-65635.pdf - Employment income summary for household tax affairs QR-65635. It shows a date of issue of 13 September 2025. 2 pages, complete.", "gift_aid_donation_summary_QR-65635.pdf - Gift aid donation summary for household tax affairs QR-65635. It shows a date of issue of 15 March 2026. It is a single page.", "capital_gains_asset_record_QR-65635.pdf - Capital gains asset record for household tax affairs QR-65635. It shows a date of issue of 24 May 2026. 2 pages, complete.", "pension_contribution_certificate_QR-65635.pdf - Pension contribution certificate for household tax affairs QR-65635. It shows a date of issue of 26 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 840}} {"id": "isc-te-00241-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Glenside Ltd", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "2 March 2026"}, "checklist": ["Service level summary, issued within the last 12 months", "Corrective action plan, issued within the last 6 months, signed", "Contract compliance checklist, signed", "Supplier performance scorecard, signed", "Invoice discrepancy log"], "submission": {"case": {"name": "Varnridge Partners", "reference": "SE-38332"}, "cover note": "Please accept my apologies - this pack was put together in a rush. If anything needs clarifying, I am happy to help. Kind regards, Callum Wadani", "documents received": ["Corrective action plan - Varnridge Partners.pdf. The document is a corrective action plan about Varnridge Partners, dated 23 December 2025, with 2 pages, complete. It is signed by the supplier's account manager.", "Invoice discrepancy log - Varnridge Partners.pdf. The document is an invoice discrepancy log about Varnridge Partners, dated 7 December 2025, with 2 pages, complete.", "Service level summary - Varnridge Partners.pdf. The document is a service level summary about Varnridge Partners, dated 20 May 2025. It is a single page.", "Bank statement - Varnridge Partners.pdf. The document is a bank statement showing payments made about Varnridge Partners, dated 7 December 2025, with 2 pages, complete.", "Supplier performance scorecard - Varnridge Partners.pdf. The document is a supplier performance scorecard about Varnridge Partners, dated 6 February 2026, with 2 pages, complete. It is signed by the category manager.", "Contract compliance checklist - Varnridge Partners.pdf. The document is a contract compliance checklist about Varnridge Partners, dated 30 January 2026, with 3 pages, complete. It is signed by the procurement officer.", "Delivery record summary - Varnridge Partners.pdf. The document is a delivery record summary about Varnridge Partners, dated 1 August 2025, with 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 855}} {"id": "isc-te-00068-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Halvby LLP", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "6 April 2026"}, "checklist": ["Safeguarding referral form, issued within the last 12 months, signed", "Needs assessment report, signed", "Support plan, signed", "Financial assessment form, signed", "Recent bank statements, issued within the last 3 months", "Proof of identity, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Vikram Nebbberg", "reference": "VI-15919"}, "documents received": ["Recent bank statements for Vikram Nebbberg. Date of issue: 15 February 2026. 8 pages, complete.", "Safeguarding referral form for Vikram Nebbberg. Date of issue: 22 December 2025. 2 pages, complete. The signature line is empty: the form is not signed.", "Financial assessment form for Vikram Nebbberg. Date of issue: 3 January 2026. 6 pages, complete. Signed by the financial assessment officer.", "Proof of identity for Vikram Nebbberg. Expiry date: 31 October 2027. Single page.", "Support plan for Vikram Nebbberg. Date of issue: 26 January 2026. 6 pages, complete. Signed by the care coordinator.", "Needs assessment report for Vikram Nebbberg. Date of issue: 4 February 2026. 12 pages, complete. Signed by the lead assessor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00099-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Bravholm Ltd", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "2 April 2026"}, "checklist": ["Confirm the pack contains a costed trip estimate sheet, issued within the last 3 months and signed.", "Confirm the pack contains an outstanding advance clearance check, signed.", "Confirm the pack contains a signed payroll deduction agreement for recovery of the advance.", "If the requested advance is above the standard advance limit, also confirm the pack contains a signed finance director approval for the higher advance.", "Confirm the pack contains a travel policy extract showing advance eligibility.", "Confirm the pack contains a signed line manager approval for the advance.", "Confirm the pack contains a trip itinerary and approval, issued within the last 3 months and signed."], "submission": {"case": {"name": "Sarah Rooksall", "reference": "KP-68602", "details": ["The requested advance is above the standard advance limit."]}, "documents received": ["KP-68602 costed trip estimate sheet.pdf - Costed trip estimate sheet for Sarah Rooksall, dated 6 February 2026, 1 page. Signed by the line manager.", "KP-68602 trip itinerary and approval.pdf - Trip itinerary and approval for Sarah Rooksall, dated 19 February 2026, 2 pages, complete. Signed by the line manager.", "KP-68602 outstanding advance clearance check.pdf - Outstanding advance clearance check for Sarah Rooksall, dated 28 February 2026, 1 page. Signed by an accounts payable officer.", "KP-68602 travel advance request form.pdf - Travel advance request form for Sarah Rooksall, dated 2 February 2026, 1 page. Signed by Sarah Rooksall.", "KP-68602 finance director approval.pdf - Finance director approval for the higher advance for Sarah Rooksall, dated 28 March 2026, 1 page. Signed by the finance director.", "KP-68602 payroll deduction agreement.pdf - Payroll deduction agreement for recovery of the advance for Sarah Rooksall, dated 5 February 2026, 1 page. Signed by Sarah Rooksall.", "KP-68602 line manager approval.pdf - Line manager approval for the advance for Sarah Rooksall, dated 9 December 2025, 1 page. Signed by the line manager.", "KP-68602 travel policy extract.pdf - Travel policy extract showing advance eligibility for Sarah Rooksall, dated 21 February 2026, 1 page.", "KP-68602 employee bank detail confirmation.pdf - Employee bank detail confirmation for Sarah Rooksall, dated 9 November 2025, 1 page. Signed by Sarah Rooksall."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 999}} {"id": "isc-te-00317-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Brenwyn Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "20 August 2026"}, "checklist": ["Obtain a financial stability statement, issued within the last 12 months and signed.", "Obtain a raw material certificate of analysis, issued within the last 6 months and signed.", "Obtain a supplier self-assessment report, issued within the last 12 months and signed.", "Obtain a supplier audit report, issued within the last 24 months and signed.", "Obtain a supplier capacity declaration, issued within the last 12 months and signed.", "Obtain a supplier quality questionnaire, issued within the last 12 months and signed."], "submission": {"case": {"name": "Haskbury BV", "reference": "CB-19498"}, "documents received": ["Haskbury_BV_Raw_Material_CoA.pdf - Raw material certificate of analysis for Haskbury BV, dated 8 April 2026. 2 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_QMS_Certificate.pdf - Certified quality management system certificate for Haskbury BV, expiring 29 June 2028. Single page.", "Haskbury_BV_Self_Assessment_Report.pdf - Supplier self-assessment report for Haskbury BV, dated 3 August 2026. 6 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Financial_Stability_Statement.pdf - Financial stability statement for Haskbury BV, dated 21 May 2026. 2 pages, complete. Signed by the chief financial officer of Haskbury BV.", "Haskbury_BV_Supplier_Audit_Report_September_2024.pdf - Supplier audit report for Haskbury BV, dated 6 September 2024. 8 pages, complete. Signed by the lead auditor.", "Haskbury_BV_Capacity_Declaration.pdf - Supplier capacity declaration for Haskbury BV, dated 18 September 2025. 2 pages, complete. Signed by the supplier's operations director.", "Haskbury_BV_Quality_Questionnaire.pdf - Supplier quality questionnaire for Haskbury BV, dated 2 October 2025. 4 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 901}} {"id": "isc-te-00293-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Glenford GmbH", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "14 April 2026"}, "checklist": ["If the job involves working at height above 2 metres, also: permit to work at height (issued within the last 1 months, signed)", "If the job will take place in an occupied office, also: occupier notification letter (issued within the last 1 months, signed)", "access authorisation slip (signed)", "cost estimate (issued within the last 3 months, signed)", "location details sheet", "photographs of the fault (issued within the last 3 months)"], "submission": {"case": {"name": "maintenance request JO-3858", "reference": "WB-64559", "details": ["The job involves working at height above two metres.", "The job will take place in an occupied office."]}, "documents received": ["Location details sheet. The sheet covers maintenance request JO-3858 and shows its date of issue as 5 February 2026. It is 1 page.", "Cost estimate. The estimate is for maintenance request JO-3858 and shows its date of issue as 29 January 2026. It is 2 pages, complete, and is signed by the estimating surveyor.", "Occupier notification letter. The letter concerns maintenance request JO-3858 and shows its date of issue as 6 April 2026. It is 1 page and is signed by the facilities coordinator.", "Permit to work at height. The permit relates to maintenance request JO-3858 and shows its date of issue as 2 April 2026. It is 1 page and carries the signature of the authorising manager.", "Access authorisation slip. The slip relates to maintenance request JO-3858 and shows its date of issue as 2 January 2026. It is 1 page and carries the signature of the site access controller.", "Photographs of the fault. The photographs relate to maintenance request JO-3858 and show their date of issue as 25 March 2026. Pages 1-1 of 2 are included."]}}, "question": {"type": "choice", "instructions": "The decision to make is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves, not the notes.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-43", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 872}} {"id": "isc-te-00029-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Ebrmoor BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "17 July 2026"}, "checklist": ["Investigator appointment letter, issued within the last 3 months", "Grievance procedure acknowledgement, issued within the last 3 months and signed", "Evidence bundle index, signed", "Meeting invitation with rights explained, issued within the last 1 months", "Previous grievance outcome letter, issued within the last 24 months", "Written grievance statement, signed", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed"], "submission": {"case": {"name": "Daan Ustett", "reference": "GC-91390", "details": ["The grievance alleges bullying by a named colleague."]}, "documents received": ["Adjustment request record. Record about Daan Ustett dated 23 May 2026. Single page, signed by Daan Ustett.", "Written grievance statement. Statement about Daan Ustett dated 4 April 2026. 3 pages, complete, signed by Daan Ustett.", "Grievance procedure acknowledgement. Acknowledgement about Daan Ustett dated 15 May 2026. Single page, signed by Daan Ustett.", "Evidence bundle index. Index about Daan Ustett dated 23 March 2026. 2 pages, complete, signed by the case investigator.", "Meeting invitation with rights explained. Invitation about Daan Ustett dated 3 July 2026. Single page.", "Previous grievance outcome letter. Letter about Daan Ustett dated 19 December 2024. 2 pages, complete.", "Witness list. List about Daan Ustett dated 4 June 2026. Single page, signed by the case investigator.", "Investigator appointment letter. Letter about Daan Ustett dated 17 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00108-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Austwald plc", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "11 September 2026"}, "checklist": ["Cancellation policy acceptance, signed.", "Venue access instructions, issued within the last 3 months.", "Prerequisite certificate.", "Employer sponsorship letter, issued within the last 3 months and signed.", "Delegate photo identification, valid (not expired) on the date of the review."], "submission": {"case": {"name": "course booking CV-74926", "reference": "ID-51962"}, "documents received": ["course_booking_form_CV-74926.pdf - Course booking form for course booking CV-74926, dated 5 June 2026. It is 2 pages, complete. It is signed by the delegate.", "venue_access_instructions_CV-74926.pdf - Venue access instructions for course booking CV-74926, dated 30 July 2026. It is a single page.", "employer_sponsorship_letter_CV-74926.pdf - Employer sponsorship letter for course booking CV-74926, dated 22 June 2026. It is a single page. It is signed by the employer's human resources manager.", "delegate_photo_identification_CV-74926.pdf - Delegate photo identification for course booking CV-74926, showing an expiry date of 10 December 2026. It is a single page.", "cancellation_policy_acceptance_CV-74926.pdf - Cancellation policy acceptance for course booking CV-74926, dated 2 September 2026. It is a single page. A sticky note covers the part where a signature would be, so it is not known whether it is signed.", "prerequisite_certificate_CV-74926.pdf - Prerequisite certificate for course booking CV-74926, dated 11 July 2026. It is a single page.", "payment_confirmation_CV-74926.pdf - Payment confirmation for course booking CV-74926, dated 5 September 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 874}} {"id": "isc-te-00124-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Gravside LLP", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "20 May 2026"}, "checklist": ["Check the pack includes the public liability insurance schedule.", "Check the pack includes the signed liability claim form.", "Check the pack includes the cleaning log for the day of the incident, issued within the last 6 months and signed.", "If the injured customer was taken to hospital by ambulance, also: check the pack includes the ambulance service record, issued within the last 12 months and signed.", "Check the pack includes the staff training record for the duty manager, issued within the last 24 months and signed.", "Check the pack includes the incident report from the day, issued within the last 3 months and signed.", "Check the pack includes the witness statement from a staff member, signed."], "submission": {"case": {"name": "Marlburg SAS", "reference": "LR-18403"}, "documents received": ["liability_claim_form_Marlburg_SAS.pdf. Liability claim form for Marlburg SAS, dated 14 May 2026, signed by the claimant. 3 pages, complete.", "staff_training_record_duty_manager_Marlburg_SAS.pdf. Staff training record for the duty manager for Marlburg SAS, dated 14 January 2025, signed by the duty manager. 2 pages, complete.", "cleaning_log_day_of_incident_Marlburg_SAS.pdf. Cleaning log for the day of the incident for Marlburg SAS, dated 26 December 2025, signed by the cleaner. Single page.", "witness_statement_staff_member_Marlburg_SAS.pdf. Witness statement from a staff member for Marlburg SAS, dated 8 April 2026, signed by the staff member. Single page.", "public_liability_insurance_schedule_Marlburg_SAS.pdf. Public liability insurance schedule for Marlburg SAS, dated 19 February 2026. 4 pages, complete.", "incident_report_Marlburg_SAS.pdf. Incident report from the day for Marlburg SAS, dated 8 May 2026, signed by the duty manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 860}} {"id": "isc-te-00231-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Gravwick Ltd", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "15 June 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "If the account will post content about financial products, also: financial promotions approval note, issued within the last 3 months, signed", "Two-factor authentication confirmation, issued within the last 3 months", "Content escalation route, signed", "Account request form, signed", "If the account will be run by an external agency, also: agency access agreement, signed", "Account closure procedure"], "submission": {"case": {"name": "new social media account DW-36887", "reference": "VT-29997", "details": ["The account will not post any content about financial products.", "The account will be run by an external agency."]}, "documents received": ["An agency access agreement for new social media account DW-36887, dated 9 May 2026. It is 2 pages, complete, and signed by the external agency's account director.", "A single-page two-factor authentication confirmation for new social media account DW-36887, dated 26 March 2026.", "A single-page social media policy acknowledgement for new social media account DW-36887, dated 22 May 2026. It is signed by the account owner.", "A single-page account purpose statement for new social media account DW-36887, dated 28 March 2026.", "A single-page admin access list for new social media account DW-36887, dated 12 June 2026.", "A single-page content escalation route for new social media account DW-36887, dated 5 March 2026. It is signed by the social media governance team lead.", "A single-page account closure procedure for new social media account DW-36887, dated 28 May 2026.", "A single-page account request form for new social media account DW-36887, dated 22 May 2026. It is signed by the marketing manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00347-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Vaskcliff SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "16 April 2026"}, "checklist": ["Check that the customer contact details sheet is present and signed.", "Check that the terms and conditions acceptance sheet is present and signed.", "Check that the identity verification document is present and valid, meaning not expired, on the date of the review.", "Check that the initial points balance statement is present and was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also check the points transfer evidence statement, which must have been issued within the last 3 months and be signed.", "Check that the marketing consent form is present and signed.", "Check that the nominated store preference form is present and signed."], "submission": {"case": {"name": "Eoin Natwick", "reference": "KR-35713", "details": ["The customer is not transferring points from any other scheme."]}, "documents received": ["marketing_consent_form_natwick.pdf. Marketing consent form for Eoin Natwick, dated 22 January 2026. A single page, signed by the customer.", "loyalty_scheme_enrolment_form_natwick.pdf. Loyalty scheme enrolment form for Eoin Natwick, dated 18 March 2026. A single page, signed by the customer.", "nominated_store_preference_form_natwick.pdf. Nominated store preference form for Eoin Natwick, dated 25 February 2026. A single page, signed by the customer.", "initial_points_balance_statement_natwick.pdf. Initial points balance statement for Eoin Natwick, dated 6 April 2026. It is a single page.", "identity_verification_document_natwick_06.pdf. Identity verification document for Eoin Natwick, showing an expiry date of 7 June 2025. It is a single page.", "customer_contact_details_sheet_natwick.pdf. Customer contact details sheet for Eoin Natwick, dated 1 January 2026. A single page, signed by the customer.", "terms_and_conditions_acceptance_sheet_natwick.pdf. Terms and conditions acceptance sheet for Eoin Natwick, dated 22 February 2026. A single page, signed by the customer."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "expired", "defect": "expired before the review", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 691}} {"id": "isc-te-00323-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Bravbury plc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "20 March 2026"}, "checklist": ["Confirm the pack contains the brand colour specification", "Confirm the pack contains the waste disposal plan", "Confirm the pack contains the kit contents list", "Confirm the pack contains a signed point of sale design proof"], "submission": {"case": {"name": "merchandising kit TQ-71056", "reference": "ZM-22416"}, "documents received": ["A brand colour specification for merchandising kit TQ-71056, dated 27 December 2025. It is a single page.", "A point of sale design proof for merchandising kit TQ-71056, dated 29 December 2025. 4 pages, complete. The area where a signature would appear cannot be seen because the bottom of the last page is cropped, so it is not known whether it is signed.", "A kit contents list for merchandising kit TQ-71056, dated 14 December 2025. 2 pages, complete.", "A waste disposal plan for merchandising kit TQ-71056, dated 4 December 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 679}} {"id": "isc-te-00491-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Elvburg Partners", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "2 September 2026"}, "checklist": ["Damaged goods exception sheet issued within the last 1 months and signed", "Transfer completion confirmation issued within the last 1 months and signed", "Cross-dock slot booking sheet issued within the last 1 months and signed", "Seal number log issued within the last 1 months and signed", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet issued within the last 1 months and signed", "Transfer manifest signed"], "submission": {"case": {"name": "cross-dock transfer AW-98841", "reference": "LJ-77614", "details": ["The transfer includes no temperature-controlled load."]}, "documents received": ["Transfer manifest for cross-dock transfer AW-98841, dated 25 May 2026. 3 pages, complete, signed by the transport planner.", "Cross-dock slot booking sheet for cross-dock transfer AW-98841, dated 23 August 2026. Single page, signed by the dock scheduler.", "Seal number log for cross-dock transfer AW-98841, dated 31 August 2026. Single page, signed by the loading bay operative.", "Transfer completion confirmation for cross-dock transfer IN-84161, dated 28 August 2026. Single page, signed by the transport coordinator.", "Outbound loading record for cross-dock transfer AW-98841, dated 22 August 2026. Single page, signed by the loading team leader.", "Damaged goods exception sheet for cross-dock transfer AW-98841, dated 24 August 2026. Single page, signed by the warehouse supervisor."]}}, "question": {"type": "choice", "instructions": "Judge the pack against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-36", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 796}} {"id": "isc-te-00270-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Brenbrook plc", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "12 March 2026"}, "checklist": ["Risk assessment, issued within the last 3 months and signed", "If the change is planned during the year-end close period, also: freeze period exception approval, signed", "Proposed rule change specification, signed", "Current rule set export, issued within the last 1 months", "Post-change test plan, signed"], "submission": {"case": {"name": "firewall change KF-54774", "reference": "PF-69842", "details": ["The change is planned during the year-end close period."]}, "documents received": ["Post-change test plan, firewall change KF-54774. Date of issue: 6 March 2026. 2 pages, complete. Signed by the test analyst.", "Freeze period exception approval, firewall change KF-54774. Date of issue: 15 November 2025. Single page. Signed by the IT operations manager.", "Proposed rule change specification, firewall change KF-54774. Date of issue: 3 December 2025. 2 pages, complete. Signed by the firewall engineer.", "Business justification memo, firewall change KF-54774. Date of issue: 13 January 2026. Single page. Signed by the requesting business unit manager.", "File name: Doc-0917.pdf. The file will not open, so its contents cannot be seen.", "Risk assessment, firewall change KF-54774. Date of issue: 15 January 2026. 2 pages, complete. Signed by the network security team lead.", "Current rule set export, firewall change KF-54774. Date of issue: 26 February 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00178-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Aldford Inc", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "21 May 2026"}, "checklist": ["Restaurant receipt issued within the last 6 months", "Hotel invoice issued within the last 6 months", "Conference fee invoice issued within the last 12 months", "Taxi fare receipt issued within the last 6 months"], "submission": {"case": {"name": "Amelia Paskez", "reference": "EQ-72163"}, "cover note": "Please find attached everything needed for this expense claim, all complete.", "documents received": ["Taxi fare receipt.pdf. A single-page taxi fare receipt concerning Amelia Paskez, showing its date of issue as 9 May 2026.", "Hotel invoice.pdf. A hotel invoice concerning Amelia Paskez, showing its date of issue as 27 January 2026. Pages 1-1 of 2 are included.", "Conference fee invoice.pdf. A single-page conference fee invoice concerning Amelia Paskez, showing its date of issue as 19 April 2026.", "Restaurant receipt.pdf. A single-page restaurant receipt concerning Amelia Paskez, showing its date of issue as 20 March 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 647}} {"id": "isc-te-00048-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lombmore Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "7 September 2026"}, "checklist": ["Audit finding sheets (signed)", "Management review minutes (signed)", "If the audit found a major non-conformity, also: major non-conformity corrective action plan (signed)", "Audit attendance sheet (signed)", "Previous audit follow-up record (issued within the last 24 months, signed)"], "submission": {"case": {"name": "internal audit IG-1902", "reference": "OH-77753", "details": ["The audit found a major non-conformity."]}, "cover note": "Please could you approve this pack as soon as possible, as all the paperwork is in order. Thank you. Tunde Thornwell", "documents received": ["Audit attendance sheet for internal audit IG-1902, dated 21 June 2026. Single page. Signed by the lead auditor.", "Major non-conformity corrective action plan for internal audit IG-1902, dated 14 June 2026. 3 pages, complete. Signed by the quality manager.", "Audit finding sheets for internal audit IG-1902, dated 17 June 2026. 2 pages, complete. The part of the page where a signature would be is covered by a sticky note, so it is not known whether it is signed.", "Management review minutes for internal audit IG-1902, dated 25 May 2026. 4 pages, complete. Signed by the quality manager.", "Previous audit follow-up record for internal audit IG-1902, dated 25 January 2025. 2 pages, complete. Signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack satisfies the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-66", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 779}} {"id": "isc-te-00434-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Quelbrook SAS", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "29 April 2026"}, "checklist": ["Experiment safety clearance form, signed, is included.", "Home institution endorsement letter, issued within the last 6 months and signed, is included.", "Radiation safety training certificate, issued within the last 24 months and signed, is included.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed, is included.", "Host scientist invitation letter, issued within the last 6 months and signed, is included.", "Photo identity document, valid (not expired) on the date of the review, is included."], "submission": {"case": {"name": "Rory Tibeau", "reference": "TW-86879"}, "cover note": "Please forgive the hurried assembly of this pack - I am sorry it was put together in a rush.", "documents received": ["host_scientist_invitation_letter_Tibeau.pdf - Host scientist invitation letter for Rory Tibeau, dated 12 April 2026. 1 page. Signed by the host scientist.", "radiation_safety_training_certificate_Tibeau.pdf - Radiation safety training certificate for Rory Tibeau, dated 14 June 2025. 1 page. Signed by the radiation protection officer.", "photo_identity_document_Tibeau.pdf - Photo identity document for Rory Tibeau, expiring 3 December 2026. 1 page.", "experiment_safety_clearance_form_Tibeau.pdf - Experiment safety clearance form for Rory Tibeau, dated 15 April 2026. 3 pages, complete. Signed by the facility safety officer.", "home_institution_endorsement_letter_Tibeau.pdf - Home institution endorsement letter for Rory Tibeau, dated 27 November 2025. 1 page. Signed by the home institution registrar.", "facility_access_application_form_Tibeau.pdf - Facility access application form for Rory Tibeau, dated 6 February 2026. 2 pages, complete. Signed by the applicant.", "out_of_hours_access_authorisation_Tibeau.pdf - Out-of-hours access authorisation for Rory Tibeau, dated 22 February 2026. 1 page. Signed by the facility manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00343-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Ebrton & Co", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "17 March 2026"}, "checklist": ["Check that the radiation safety training certificate is included, that it was issued within the last 24 months and that it is signed.", "Check that the insurance declaration for facility work is included, that it was issued within the last 12 months and that it is signed.", "Check that the photo identity document is included and that it is valid, meaning not expired, on the date of the review.", "Check that the beam time or instrument booking confirmation is included.", "Check that the experiment safety clearance form is included and that it is signed."], "submission": {"case": {"name": "Elif Aldmore", "reference": "NP-73151"}, "documents received": ["d7_host_scientist_invitation_letter_elif_aldmore.pdf. Host scientist invitation letter for Elif Aldmore, issued on 18 January 2026. It is a single page and is signed by the host scientist.", "d5_experiment_safety_clearance_form_elif_aldmore.pdf. Experiment safety clearance form for Elif Aldmore, issued on 15 January 2026. All 3 pages are included, but the signature block on the last page is covered by a sticky note, so it is not known whether the form is signed.", "d1_radiation_safety_training_certificate_elif_aldmore.pdf. Radiation safety training certificate for Elif Aldmore, issued on 7 April 2024. It is a single page and is signed by the radiation safety training officer.", "d4_beam_time_booking_confirmation_elif_aldmore.pdf. Beam time or instrument booking confirmation for Elif Aldmore, issued on 23 December 2025. It is a single page.", "d2_insurance_declaration_facility_work_elif_aldmore.pdf. Insurance declaration for facility work for Elif Aldmore, issued on 18 December 2025. It is a single page and is signed by the insurance provider's authorised representative.", "d6_home_institution_endorsement_letter_elif_aldmore.pdf. Home institution endorsement letter for Elif Aldmore, issued on 8 February 2026. It is a single page and is signed by the home institution's head of department.", "d3_photo_identity_document_elif_aldmore.pdf. Photo identity document for Elif Aldmore, with an expiry date of 10 February 2028. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 938}} {"id": "isc-te-00146-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Zervgard Ltd", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "23 June 2026"}, "checklist": ["If the household rents the home, also: landlord written permission (issued within the last 6 months, signed)", "energy performance certificate (valid, not expired, on the date of the review)", "If the property is a listed building, also: listed building consent (issued within the last 12 months, signed)", "planning permission letter (issued within the last 12 months)", "scaffolding agreement (signed)", "grid connection application (issued within the last 12 months, signed)"], "submission": {"case": {"name": "roof VO-57826", "reference": "DC-77115", "details": ["The household rents the home.", "The property is not a listed building."]}, "documents received": ["meter_reading_photo_VO-57826.pdf. This is a meter reading photo about roof VO-57826, dated 5 June 2026. It is a single page.", "utility_bill_VO-57826.pdf. This is a utility bill showing energy usage about roof VO-57826. It shows an expiry date of 28 July 2026. 3 pages, complete.", "planning_permission_letter_VO-57826.pdf. This is a planning permission letter about roof VO-57826, dated 29 December 2025. 2 pages, complete.", "energy_performance_certificate_VO-57826.pdf. This is an energy performance certificate about roof VO-57826. It shows an expiry date of 28 July 2026. 3 pages, complete.", "grid_connection_application_VO-57826.pdf. This is a grid connection application about roof VO-57826, dated 8 July 2025. 2 pages, complete. It is signed by the householder.", "scaffolding_agreement_VO-57826.pdf. This is a scaffolding agreement about roof VO-57826, dated 20 March 2026. 2 pages, complete. It is signed by the scaffolding company.", "landlord_written_permission_VO-57826.pdf. This is a landlord written permission about roof VO-57826, dated 14 May 2026. It is a single page and is signed by the landlord."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 751}} {"id": "isc-te-00208-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Urvmore SAS", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "3 September 2026"}, "checklist": ["Previous flexible working requests record, issued within the last 24 months", "Trial period proposal, signed", "Flexible working request form, signed", "Line manager opinion note, issued within the last 2 months and signed", "If the request is to work entirely from home, also: home working equipment checklist, signed"], "submission": {"case": {"name": "Hannah Wadingham", "reference": "IR-86010", "details": ["The request is to work entirely from home."]}, "documents received": ["Flexible_working_request_form_2026-06-11_pages_1-3.pdf. Flexible working request form for Hannah Wadingham, dated 11 June 2026. 3 pages, complete. Signed by the employee.", "Previous_flexible_working_requests_record_2024-10-05.pdf. Previous flexible working requests record for Hannah Wadingham, dated 5 October 2024. 1 page.", "Line_manager_opinion_note_2026-08-28.pdf. Line manager opinion note for Hannah Wadingham, dated 28 August 2026. 2 pages, complete. Signed by the line manager.", "Trial_period_proposal_2026-07-29.pdf. Trial period proposal for Hannah Wadingham, dated 29 July 2026. 1 page. Signed by the line manager.", "File_0417.pdf. The contents of this file cannot be seen: the scan is too faint to read.", "Home_working_equipment_checklist_2026-05-27.pdf. Home working equipment checklist for Hannah Wadingham, dated 27 May 2026. 2 pages, complete. Signed by the employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00066-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Vorndale BV", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "31 July 2026"}, "checklist": ["Confirm the pack includes a medical examination certificate issued within the last 6 months and signed.", "Confirm the pack includes a signed driver declaration of convictions.", "Confirm the pack includes a passport style photograph issued within the last 6 months.", "Confirm the pack includes a photo driving licence that is valid (not expired) on the date of the review.", "Confirm the pack includes a criminal record check issued within the last 3 months.", "Confirm the pack includes a signed licence application form."], "submission": {"case": {"name": "Freya Brodton", "reference": "WI-95367"}, "cover note": "I am not sure everything needed is here, so please take a careful look.", "documents received": ["WI-95367_Brodton_driver_declaration_of_convictions.pdf - Driver declaration of convictions for Freya Brodton, dated 12 May 2026. 1 page. Signed by Freya Brodton.", "WI-95367_Brodton_photo_driving_licence.pdf - Photo driving licence for Freya Brodton, expiring 29 September 2028. 2 pages, complete.", "WI-95367_Brodton_licence_application_form.pdf - Licence application form for Freya Brodton, dated 13 May 2026. 6 pages, complete. Signed by the applicant.", "WI-95367_Brodton_medical_examination_certificate.pdf - Medical examination certificate for Freya Brodton, dated 6 July 2026. 2 pages, complete. Signed by the examining doctor.", "WI-95367_Brodton_passport_style_photograph.pdf - Passport style photograph of Freya Brodton, dated 21 July 2026. 1 page.", "WI-95367_Brodton_criminal_record_check.pdf - Criminal record check for Freya Brodton, dated 20 June 2026. 6 pages, complete.", "WI-95367_Brodton_police_caution_letter.pdf - Police caution letter from several years ago concerning Freya Brodton, dated 20 June 2026. 6 pages, complete.", "WI-95367_Brodton_knowledge_test_pass_certificate.pdf - Knowledge test pass certificate for Freya Brodton, dated 19 April 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 947}} {"id": "isc-te-00121-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jundmoor Partners", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "4 August 2026"}, "checklist": ["Drying contractor's certificate of completion, issued within the last 6 months and signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Buildings insurance policy schedule", "Council flood warning notice, issued within the last 12 months", "Flood claim form, signed"], "submission": {"case": {"name": "property KX-91092", "reference": "OX-34504"}, "cover note": "I am sorry that this pack was put together in a rush. — Carmen Orvova", "documents received": ["d3_buildings_insurance_policy_schedule_KX91092.pdf — Buildings insurance policy schedule for property KX-91092, dated 13 May 2026. 5 pages, complete.", "d2_photographs_of_flood_water_in_the_rooms_KX91092.pdf — Photographs of flood water in the rooms at property KX-91092, dated 19 July 2026. 3 pages, complete.", "d6_newspaper_clipping_KX91092.pdf — Newspaper clipping about flooding in another town, concerning property KX-91092, dated 1 March 2026. 1 page.", "d4_council_flood_warning_notice_KX91092.pdf — Council flood warning notice for property KX-91092, dated 1 March 2026. 1 page.", "d5_flood_claim_form_KX91092.pdf — Flood claim form for property KX-91092, dated 9 April 2026. 5 pages, complete. Signed by the claimant.", "d1_drying_contractors_certificate_of_completion_KX91092.pdf — Drying contractor's certificate of completion for property KX-91092, dated 17 May 2026. 2 pages, complete. Signed by the drying contractor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 865}} {"id": "isc-te-00073-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Oskbrook Inc", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 March 2026"}, "checklist": ["External advisory board minutes, issued within the last 12 months, signed.", "Annual activity report, issued within the last 6 months, signed.", "Doctoral researcher progress summary, issued within the last 6 months, signed.", "Director's declaration of interests, issued within the last 12 months, signed."], "submission": {"case": {"name": "Dravhaven & Co", "reference": "AO-71168"}, "documents received": ["AO-71168_doctoral_researcher_progress_summary_2025-10-03_v2.pdf — Doctoral researcher progress summary for Dravhaven & Co, dated 3 October 2025. Pages 1-1 of 2 are included. Signed by the institute director.", "AO-71168_publications_list_2025-09-15.pdf — Publications list for Dravhaven & Co, dated 15 September 2025. 4 pages, complete.", "AO-71168_intellectual_property_register_extract_2026-01-29.pdf — Intellectual property register extract for Dravhaven & Co, dated 29 January 2026. Single page. Signed by the institute director.", "AO-71168_annual_activity_report_2026-01-08.pdf — Annual activity report for Dravhaven & Co, dated 8 January 2026. 12 pages, complete. Signed by the institute director.", "AO-71168_external_advisory_board_minutes_2025-08-18.pdf — External advisory board minutes for Dravhaven & Co, dated 18 August 2025. 4 pages, complete. Signed by the chair of the external advisory board.", "AO-71168_directors_declaration_of_interests_2025-04-16.pdf — Director's declaration of interests for Dravhaven & Co, dated 16 April 2025. Single page. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 882}} {"id": "isc-te-00463-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Jorwick & Co", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "5 August 2026"}, "checklist": ["Obtain a shareholder register extract issued within the last 3 months.", "Obtain a signed board resolution to open the account.", "Obtain a signed beneficial owner identification form.", "Obtain a proof of registered office address issued within the last 3 months."], "submission": {"case": {"name": "Kaldvik Inc", "reference": "KZ-84732"}, "cover note": "Please review the attached pack for the Kaldvik Inc file. I am not certain that everything needed has been included.", "documents received": ["shareholder_register_extract_Kaldvik_Inc.pdf. Shareholder register extract for Kaldvik Inc, dated 21 July 2026. 2 pages, complete.", "proof_of_registered_office_address_Kaldvik_Inc.pdf. Proof of registered office address for Kaldvik Inc, dated 1 August 2026. Single page.", "board_resolution_Kaldvik_Inc.pdf. Board resolution to open the account for Kaldvik Inc, dated 13 April 2026. Single page, signed by the chair of the board.", "beneficial_owner_identification_form_Kaldvik_Inc.pdf. Beneficial owner identification form for Kaldvik Inc, dated 31 July 2026. 3 pages, complete, signed by a director."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "variant-74", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 704}} {"id": "isc-te-00273-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Pravburg Group", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "11 May 2026"}, "checklist": ["Confirm the pack includes the final payroll cut-off note, issued within the last 1 months and signed.", "If the leaver is moving to a competitor, also: confidential data removal attestation, issued within the last 1 months and signed.", "Confirm the pack includes the shared mailbox handover record, issued within the last 1 months and signed.", "Confirm the pack includes the leaver notification form, signed.", "Confirm the pack includes the non-disclosure reminder acknowledgement, signed.", "Confirm the pack includes the line manager confirmation, issued within the last 1 months and signed.", "Confirm the pack includes the access rights inventory, issued within the last 1 months."], "submission": {"case": {"name": "Elena Ingmore", "reference": "CR-23529", "details": ["The leaver is not moving to a competitor."]}, "documents received": ["final payroll cut-off note – Elena Ingmore.pdf. A final payroll cut-off note concerning Elena Ingmore, dated 23 April 2026. It is a single page and is signed by the payroll manager.", "service desk ticket closure summary – Elena Ingmore.pdf. A service desk ticket closure summary concerning Elena Ingmore, dated 26 April 2026. It runs to 3 pages, complete.", "access rights inventory – Elena Ingmore.pdf. An access rights inventory concerning Elena Ingmore, dated 5 May 2026. It runs to 4 pages, complete.", "shared mailbox handover record – Elena Ingmore.pdf. A shared mailbox handover record concerning Elena Ingmore, dated 4 May 2026. It runs to 2 pages, complete, and is signed by the IT operations lead.", "leaver notification form – Elena Ingmore.pdf. A leaver notification form concerning Elena Ingmore, dated 30 March 2026. It runs to 2 pages, complete, and is signed by HR.", "equipment return receipt – Elena Ingmore.pdf. An equipment return receipt concerning Elena Ingmore, dated 30 April 2026. It is a single page and is signed by the asset coordinator.", "non-disclosure reminder acknowledgement – Elena Ingmore.pdf. A non-disclosure reminder acknowledgement concerning Elena Ingmore, dated 26 March 2026. It is a single page and is signed by Elena Ingmore.", "line manager confirmation – Elena Ingmore (unsigned copy).pdf. A line manager confirmation concerning Elena Ingmore, dated 23 April 2026. It is a single page and its signature line is empty, so it is not signed."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack meets the checklist. Go line by line through the checklist, covering every line relevant to this case. To count, a required document must be of the kind listed on the checklist (not a similar one), be about the subject of the case, have all its pages present, be signed wherever the checklist calls for a signature, not be expired on the date of the review, and fall within the issue period the checklist allows. A conditional line applies only when its circumstance is true for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: one or more applicable lines are not satisfied. unclear: no applicable line is clearly unmet, yet at least one cannot be determined from what is shown, such as a needed date, signature or page count being not visible, a document's kind being impossible to tell, or the case details not stating whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels can mislead; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-37", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 992}} {"id": "isc-te-00175-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Selvlund SAS", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "2 July 2026"}, "checklist": ["Check that the expense claim form is signed.", "If the claim exceeds the limit that requires director sign-off, also: check for a director approval slip issued within the last 3 months and signed.", "Check for a train ticket receipt.", "Check for a conference fee invoice issued within the last 12 months.", "Check for a currency conversion statement issued within the last 6 months."], "submission": {"case": {"name": "Sarah Quillley", "reference": "FZ-65007", "details": ["The claim is below the limit requiring director sign-off."]}, "documents received": ["Expense claim form - Sarah Quillley.pdf - A 2-page expense claim form for Sarah Quillley, dated 17 May 2026. 2 pages, complete. It has been signed by Sarah Quillley.", "Currency conversion statement - Sarah Quillley.pdf - A single-page currency conversion statement for Sarah Quillley, dated 21 April 2026.", "Train ticket receipt - Sarah Quillley.pdf - A single-page train ticket receipt for Sarah Quillley, dated 4 April 2026.", "Restaurant receipt - Sarah Quillley.pdf - A single-page restaurant receipt for Sarah Quillley, dated 19 February 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 691}} {"id": "isc-te-00053-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Gravmark plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "1 May 2026"}, "checklist": ["Account closure procedure is included in the pack.", "Account purpose statement is included in the pack.", "Platform terms acceptance record, signed, is included in the pack.", "Content escalation route, signed, is included in the pack.", "Naming convention approval, signed, is included in the pack."], "submission": {"case": {"name": "new social media account UG-91608", "reference": "FX-57324"}, "documents received": ["account_request_form_UG-91608.pdf - Account request form for new social media account UG-91608. Its date of issue is 30 March 2026. It is 1 page. It is signed by the requesting marketing manager.", "platform_terms_acceptance_record_UG-91608.pdf - Platform terms acceptance record for new social media account UG-91608. Its date of issue is 11 March 2026. It is 1 page. It is signed by the account owner.", "content_escalation_route_UG-91608.pdf - Content escalation route for new social media account UG-91608. Its date of issue is 7 January 2026. It is 1 page. It is signed by the social media governance team lead.", "account_purpose_statement_UG-91608.pdf - Account purpose statement for new social media account UG-91608. Its date of issue is 24 March 2026. It is 1 page.", "file_FX-57324_07.pdf - The contents of this file cannot be seen, as the scan is blank.", "naming_convention_approval_UG-91608.pdf - Naming convention approval for new social media account UG-91608. Its date of issue is 18 March 2026. It is 1 page. It is signed by the social media governance team lead.", "account_closure_procedure_UG-91608.pdf - Account closure procedure for new social media account UG-91608. Its date of issue is 5 January 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 905}} {"id": "isc-te-00213-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Bravhaven Partners", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "6 July 2026"}, "checklist": ["Council flood warning notice, issued within the last 12 months", "Loss adjuster's inspection report, issued within the last 6 months and signed", "Debris removal invoice, issued within the last 6 months", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "Buildings insurance policy schedule"], "submission": {"case": {"name": "property OD-78962", "reference": "ZY-65584"}, "documents received": ["utility_suppliers_letter_OD-78962.pdf - Utility supplier's letter confirming the supply was cut off about property OD-78962. Dated 9 September 2025. 1 page.", "debris_removal_invoice_OD-78962.pdf - Debris removal invoice about property OD-78962. Dated 19 January 2026. 1 page.", "loss_adjusters_inspection_report_OD-78962_v2.pdf - Loss adjuster's inspection report about property OD-78962. Dated 4 April 2026. Pages 1-5 of 6. Signed by the loss adjuster.", "buildings_insurance_policy_schedule_OD-78962.pdf - Buildings insurance policy schedule about property OD-78962. Dated 10 March 2026. 5 pages, complete.", "photographs_of_flood_water_in_the_rooms_OD-78962.pdf - Photographs of flood water in the rooms about property OD-78962. Dated 21 June 2026. 3 pages, complete.", "council_flood_warning_notice_OD-78962.pdf - Council flood warning notice about property OD-78962. Dated 3 April 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 832}} {"id": "isc-te-00236-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Haskmont Group", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "4 March 2026"}, "checklist": ["Scaffolding agreement, signed", "Insurance notification letter, issued within the last 6 months", "Meter reading photo, issued within the last 1 months", "Grid connection application, issued within the last 12 months, signed", "Planning permission letter, issued within the last 12 months"], "submission": {"case": {"name": "roof OS-53775", "reference": "WL-45574"}, "documents received": ["Meter reading photo for roof OS-53775, dated 28 February 2026. Single page.", "Insurance notification letter for roof OS-53775, dated 29 December 2025. Single page.", "Planning permission letter for roof OS-53775, dated 18 March 2025. 2 pages, complete.", "Scaffolding agreement for roof OS-53775, dated 1 February 2026. 2 pages, complete. Signed by the property owner.", "File named document04.pdf: the file will not open, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 663}} {"id": "isc-te-00019-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Xanvale LLP", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "26 March 2026"}, "checklist": ["If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "prerequisite certificate", "employer sponsorship letter (issued within the last 3 months, signed)", "cancellation policy acceptance (signed)", "payment confirmation (issued within the last 3 months)", "venue access instructions (issued within the last 3 months)", "course booking form (signed)"], "submission": {"case": {"name": "course booking HG-96006", "reference": "MZ-70767"}, "documents received": ["Course booking form for course booking HG-96006, dated 10 January 2026. 2 pages, complete. Signed by the course booking delegate.", "Prerequisite certificate for course booking HG-96006, dated 12 February 2026. Single page.", "Cancellation policy acceptance for course booking HG-96006, dated 24 December 2025. Single page, signed by the course booking delegate.", "Venue access instructions for course booking HG-96006, dated 17 January 2026. Single page.", "Delegate photo identification for course booking HG-96006, showing an expiry date of 7 December 2027. Single page.", "Employer sponsorship letter for course booking HG-96006, dated 23 February 2026. Single page, signed by the employer's authorised signatory.", "Payment confirmation for course booking HG-96006, dated 11 January 2026. Single page.", "Special requirements note for course booking HG-96006, dated 19 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Ask yourself: does the pack match the checklist? Review each line of the checklist that is relevant to this case. A required document only counts if it is the kind of document the list names (not a similar one), is about the case subject, has all its pages, is signed in every place the checklist asks for a signature, was not expired on the review date, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for this case. complete: all applicable lines are met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one line cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-61", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 799}} {"id": "isc-te-00018-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silthorpe Group", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "15 April 2026"}, "checklist": ["Customer account details page, issued within the last 3 months", "Terms of sale acceptance log, issued within the last 12 months", "Customer order history extract, issued within the last 6 months", "Transaction record printout, issued within the last 3 months", "Fraud screening result sheet, issued within the last 3 months", "Chargeback response form, signed"], "submission": {"case": {"name": "disputed transaction NP-25742", "reference": "HU-11985"}, "documents received": ["Scanned chargeback response form for disputed transaction NP-25742, dated 9 April 2026. 2 pages, complete. Signed by the payments disputes team supervisor.", "Scanned fraud screening result sheet for disputed transaction NP-25742, dated 9 April 2026. 1 page.", "Scanned transaction record printout for disputed transaction NP-25742, dated 13 February 2026. 1 page.", "Scanned customer account details page for disputed transaction NP-25742, dated 17 February 2026. 1 page.", "Scanned customer order history extract for disputed transaction NP-25742, dated 21 January 2026. 2 pages, complete.", "Scanned terms of sale acceptance log for disputed transaction NP-25742, dated 29 March 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 743}} {"id": "isc-te-00444-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Rosford Inc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "9 June 2026"}, "checklist": ["Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Root cause analysis report, issued within the last 3 months, signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Customer impact statement, issued within the last 3 months."], "submission": {"case": {"name": "production incident HL-93807", "reference": "ZA-47773", "details": ["The incident was caused entirely by internal systems."]}, "documents received": ["Root cause analysis report for production incident HL-93807, dated 5 April 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Incident timeline for production incident HL-93807, dated 3 May 2026. 3 pages, complete.", "Follow-up owner assignment sheet for production incident HL-93807, dated 11 May 2026. A single page, signed by the reliability engineering lead.", "Customer impact statement for production incident HL-93807, dated 4 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 507}} {"id": "isc-te-00272-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Teskham SAS", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "2 June 2026"}, "checklist": ["Access rights inventory, issued within the last 1 month.", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 month, signed.", "Final payroll cut-off note, issued within the last 1 month, signed.", "Line manager confirmation, issued within the last 1 month, signed.", "Non-disclosure reminder acknowledgement, signed.", "Equipment return receipt, issued within the last 1 month, signed.", "If the leaver is moving to a competitor, also: confidential data removal attestation, issued within the last 1 month, signed.", "Service desk ticket closure summary, issued within the last 1 month."], "submission": {"case": {"name": "Francesca Cormmore", "reference": "XV-89813", "details": ["The leaver held no privileged administrator accounts.", "The leaver is moving to a competitor."]}, "documents received": ["equipment_return_receipt_cormmore_13_may.pdf - Equipment return receipt for Francesca Cormmore. Date of issue: 13 May 2026. Single page, signed by the IT Asset Coordinator.", "confidential_data_removal_attestation_cormmore.pdf - Confidential data removal attestation for Francesca Cormmore. Date of issue: 25 May 2026. Single page, signed by the Information Security Officer.", "equipment_return_receipt_cormmore_24_mar_2025.pdf - Equipment return receipt for Francesca Cormmore. Date of issue: 24 March 2025. Single page, signed by the IT Asset Coordinator.", "line_manager_confirmation_cormmore.pdf - Line manager confirmation for Francesca Cormmore. Date of issue: 31 May 2026. Single page, signed by the Line Manager.", "service_desk_ticket_closure_summary_cormmore.pdf - Service desk ticket closure summary for Francesca Cormmore. Date of issue: 30 May 2026. 3 pages, complete.", "final_payroll_cutoff_note_cormmore.pdf - Final payroll cut-off note for Francesca Cormmore. Date of issue: 31 May 2026. Single page, signed by the Payroll Manager.", "access_rights_inventory_cormmore.pdf - Access rights inventory for Francesca Cormmore. Date of issue: 21 May 2026. 4 pages, complete.", "non_disclosure_reminder_acknowledgement_cormmore.pdf - Non-disclosure reminder acknowledgement for Francesca Cormmore. Date of issue: 11 February 2026. Single page, signed by the departing employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 975}} {"id": "isc-te-00055-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Pellby Group", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "19 June 2026"}, "checklist": ["Gifted deposit letter, issued within the last 3 months and signed", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months and signed", "Proof of deposit savings, issued within the last 3 months", "P60 tax summary, issued within the last 15 months", "Property valuation report, issued within the last 3 months and signed", "Mortgage application form, issued within the last 3 months and signed", "Three most recent payslips, issued within the last 3 months"], "submission": {"case": {"name": "Tyler Ebbaker", "reference": "JB-96407", "details": ["The borrower is self-employed."]}, "documents received": ["gifted_deposit_letter.pdf. A gifted deposit letter concerning Tyler Ebbaker, dated 5 April 2026. It is a single page and has been signed by the donor of the gift.", "proof_of_deposit_savings.pdf. A proof of deposit savings concerning Tyler Ebbaker, dated 3 May 2026. 2 pages, complete.", "tax_year_overviews.pdf. Two most recent tax year overviews concerning Tyler Ebbaker, dated 12 December 2025. 4 pages, complete. They have been signed by HM Revenue and Customs.", "property_valuation_report.pdf. A property valuation report concerning Tyler Ebbaker, dated 31 May 2026. 8 pages, complete. It has been signed by the surveyor who carried out the valuation.", "payslips.pdf. Three most recent payslips concerning Tyler Ebbaker, dated 14 June 2026. 3 pages, complete.", "mortgage_application_form.pdf. A mortgage application form concerning Tyler Ebbaker, dated 7 May 2026. 10 pages, complete. It has been signed by the applicant.", "bank_statements.pdf. Three months of bank statements concerning Tyler Ebbaker, dated 5 May 2026. 9 pages, complete.", "passport.pdf. A passport concerning Tyler Ebbaker, with an expiry date of 8 April 2027. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 893}} {"id": "isc-te-00154-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Gravheim & Co", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "19 May 2026"}, "checklist": ["If the supplier missed the agreed service levels, also: service credit request form (signed)", "Service level summary (issued within the last 12 months)", "Contract compliance checklist (signed)", "Quality inspection report (issued within the last 6 months, signed)", "Invoice discrepancy log", "Supplier performance scorecard (signed)", "Supplier response letter (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Jorstead GmbH", "reference": "CT-25492", "details": ["The supplier met all agreed service levels."]}, "cover note": "I have put the pack together for review, but I am not sure everything needed is there. Please let me know if anything else is required.", "documents received": ["Supplier performance scorecard for Jorstead GmbH, dated 14 April 2026. Signed by the supplier manager. 2 pages, complete.", "Invoice discrepancy log for Jorstead GmbH, dated 10 February 2026. 2 pages, complete.", "Contract compliance checklist for Jorstead GmbH, dated 5 February 2026. Signed by the contract manager. 3 pages, complete.", "Supplier response letter for Jorstead GmbH, dated 27 April 2026. Signed by the supplier's account director. Single page.", "Quality inspection report for Jorstead GmbH, dated 12 May 2026. Signed by the quality inspector. 3 pages, complete.", "Service level summary for Jorstead GmbH, dated 14 October 2025. Single page.", "Delivery record summary for Jorstead GmbH, dated 19 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00423-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pentmont Group", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 May 2026"}, "checklist": ["Line manager approval, signed.", "Visa entry requirement printout, issued within the last 3 months.", "Hotel booking confirmation.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Flight itinerary quote, issued within the last 1 months."], "submission": {"case": {"name": "business trip NZ-61217", "reference": "SD-60329", "details": ["The trip involves travel to a country requiring a visa."]}, "documents received": ["Hotel booking confirmation for business trip NZ-61217, dated 6 February 2026, 2 pages, complete.", "Passport copy for international travel for business trip NZ-61217, showing an expiry date of 13 June 2027, 1 page.", "Line manager approval for business trip NZ-61217, dated 27 April 2026, 1 page, signed by the line manager.", "Visa entry requirement printout for business trip NZ-61217, dated 20 May 2026, pages 1-2 included, with the total number of pages not shown anywhere.", "Visa approval letter for business trip NZ-61217, dated 16 March 2026, 2 pages, complete.", "Flight itinerary quote for business trip NZ-61217, dated 23 May 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 764}} {"id": "isc-te-00144-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Merswood Inc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "29 May 2026"}, "checklist": ["If the account will be run by an external agency, also: agency access agreement (signed)", "admin access list (issued within the last 3 months)", "account purpose statement", "platform terms acceptance record (signed)", "two-factor authentication confirmation (issued within the last 3 months)", "content escalation route (signed)"], "submission": {"case": {"name": "new social media account FY-24531", "reference": "QP-40875", "details": ["The account will be run entirely by in-house staff."]}, "cover note": "Please find the pack for new social media account FY-24531 attached for your review. I am not sure everything needed is there, so do let me know if anything else is required. Many thanks, Eilidh Ebbnall", "documents received": ["Content escalation route, new social media account FY-24531. Date of issue: 17 February 2026. It is a single page. It is signed by the Social Media Governance Lead.", "Account purpose statement, new social media account FY-24531. Date of issue: 30 April 2026. It is a single page.", "Platform terms acceptance record, new social media account FY-24531. Date of issue: 20 February 2026. It is a single page. It is signed by the Social Media Governance Lead.", "Admin access list, new social media account FY-24531. Date of issue: 12 March 2026. It is a single page.", "Two-factor authentication confirmation, new social media account FY-24531. Date of issue: 15 May 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 805}} {"id": "isc-te-00078-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Dundwyn Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "4 June 2026"}, "checklist": ["Confirm the marketing consent form is present and signed.", "Confirm the customer contact details sheet is present and signed.", "Confirm the loyalty scheme enrolment form is present and signed.", "If the customer is joining as a household account with a shared card, also: confirm the household member details form is present and signed.", "Confirm the initial points balance statement is present and was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also: confirm the points transfer evidence statement is present, was issued within the last 3 months, and is signed."], "submission": {"case": {"name": "Camille Plumopoulos", "reference": "BU-34218", "details": ["The customer is joining as a single-person account.", "The customer is transferring points from a rival scheme."]}, "documents received": ["initial_points_balance_statement_plumopoulos_21march2026.pdf: A single-page initial points balance statement about Camille Plumopoulos, dated 21 March 2026. The statement shows the starting points balance for the new loyalty account.", "loyalty_scheme_enrolment_form_plumopoulos_1may2026.pdf: A single-page loyalty scheme enrolment form about Camille Plumopoulos, dated 1 May 2026. The enrolment form has been signed by the customer.", "points_transfer_evidence_statement_plumopoulos_23may2026.pdf: a single-page points transfer evidence statement about Camille Plumopoulos, dated 23 May 2026. The statement has been signed by the rival scheme administrator.", "marketing_consent_form_plumopoulos_31march2026.pdf: A single-page marketing consent form about Camille Plumopoulos, dated 31 March 2026. The signature line is empty, so the form is not signed.", "customer_contact_details_sheet_plumopoulos_30may2026.pdf: A single-page customer contact details sheet about Camille Plumopoulos, dated 30 May 2026. The sheet carries the customer's signature."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 869}} {"id": "isc-te-00251-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Halvness Ltd", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "2 July 2026"}, "checklist": ["If the equipment is above the major purchase threshold, also include: tender waiver justification (signed)", "equipment purchase request form (signed)", "cost-benefit justification", "maintenance plan", "training needs assessment (signed)", "installation requirements note"], "submission": {"case": {"name": "equipment JG-44908", "reference": "EJ-48033", "details": ["The equipment is below the major purchase threshold."]}, "documents received": ["cost-benefit justification - JG-44908.pdf. This is the cost-benefit justification for equipment JG-44908, dated 28 May 2026, 3 pages, complete.", "equipment purchase request form - JG-44908.pdf. This is the equipment purchase request form for equipment JG-44908, dated 18 April 2026, 2 pages, complete. It is signed by the requesting department head.", "training needs assessment - JG-44908.pdf. This is the training needs assessment for equipment JG-44908, dated 8 May 2026. It is a single page and is signed by the training coordinator.", "vendor quotation - JG-44908.pdf. This is the vendor quotation for equipment JG-44908, dated 14 May 2026, 2 pages, complete.", "installation requirements note - JG-44908.pdf. This is the installation requirements note for equipment JG-44908, dated 29 April 2026, 2 pages, complete.", "warranty leaflet - JG-44908.pdf. This is a warranty leaflet from a different product, dated 24 March 2026, 2 pages, complete. It refers to equipment JG-44908 only in the file name.", "grant fund eligibility note - JG-44908.pdf. This is the grant fund eligibility note for equipment JG-44908, dated 15 May 2026. It is a single page and is signed by the finance officer."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 912}} {"id": "isc-te-00300-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jorheim Inc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "29 June 2026"}, "checklist": ["Photographs of the spillage on the floor, issued within the last 1 months.", "Witness statement from a staff member, signed.", "Staff training record for the duty manager, issued within the last 24 months and signed.", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed.", "CCTV footage stills of the incident, issued within the last 3 months.", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed.", "Public liability insurance schedule."], "submission": {"case": {"name": "Dravfeld SAS", "reference": "WO-22645", "details": ["The injured customer did not go to hospital.", "The customer is handling the claim personally."]}, "documents received": ["Incident report from the day - Dravfeld SAS.pdf. The report on the incident on the day at Dravfeld SAS is dated 16 May 2026 and is signed by the duty manager. 2 pages, complete.", "Public liability insurance schedule - Dravfeld SAS.pdf. The schedule for Dravfeld SAS shows a date of issue of 23 April 2026. 4 pages, complete.", "Witness statement from a staff member - Dravfeld SAS.pdf. The statement from a staff member at Dravfeld SAS is dated 4 April 2026 and is 1 page. It is signed by the staff witness.", "Staff training record for the duty manager - Dravfeld SAS.pdf. The record for the duty manager at Dravfeld SAS is dated 30 September 2025 and is signed by the duty manager. 2 pages, complete.", "CCTV footage stills of the incident - Dravfeld SAS.pdf. The stills from the CCTV footage of the incident at Dravfeld SAS show a date of issue of 19 June 2026. 2 pages, complete.", "Photographs of the spillage on the floor - Dravfeld SAS.pdf. The photographs show the spillage on the floor at Dravfeld SAS, with a date of issue of 18 June 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 911}} {"id": "isc-te-00032-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Caelley GmbH", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "3 July 2026"}, "checklist": ["Photographs of the spillage on the floor, issued within the last 1 months.", "Cleaning log for the day of the incident, issued within the last 6 months, signed.", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months, signed.", "Liability claim form, signed.", "Incident report from the day, issued within the last 3 months, signed."], "submission": {"case": {"name": "Elvshaw Ltd", "reference": "YZ-88387", "details": ["The customer has appointed a solicitor for the claim."]}, "documents received": ["Elvshaw_Ltd_incident_report_24_November_2025.pdf. Incident report from the day relating to Elvshaw Ltd. Date of issue shown as 24 November 2025. 2 pages, complete. Signed by the duty manager.", "Elvshaw_Ltd_liability_claim_form_16_May_2026.pdf. Liability claim form relating to Elvshaw Ltd. Date of issue shown as 16 May 2026. 3 pages, complete. Signed by the customer.", "Elvshaw_Ltd_incident_report_10_April_2026.pdf. Incident report from the day relating to Elvshaw Ltd. Date of issue shown as 10 April 2026. 2 pages, complete. Signed by the first aider on duty.", "Elvshaw_Ltd_cleaning_log_24_February_2026.pdf. Cleaning log for the day of the incident relating to Elvshaw Ltd. Date of issue shown as 24 February 2026. Single page. Signed by the duty manager.", "Elvshaw_Ltd_CCTV_footage_stills_14_May_2026.pdf. CCTV footage stills of the incident relating to Elvshaw Ltd. Date of issue shown as 14 May 2026. 2 pages, complete.", "Elvshaw_Ltd_spillage_floor_photographs_22_June_2026.pdf. Photographs of the spillage on the floor relating to Elvshaw Ltd. Date of issue shown as 22 June 2026. Single page.", "Elvshaw_Ltd_letter_of_claim_31_March_2026.pdf. Letter of claim from the solicitor relating to Elvshaw Ltd. Date of issue shown as 31 March 2026. 3 pages, complete. Signed by the customer's solicitor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 991}} {"id": "isc-te-00182-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Faldfell Ltd", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "11 March 2026"}, "checklist": ["Licence reassignment note issued within the last 3 months, signed.", "Asset register update issued within the last 1 months.", "Data wipe certificate issued within the last 3 months, signed.", "Final backup confirmation issued within the last 3 months, signed.", "Decommission request form, signed."], "submission": {"case": {"name": "retired server ZL-17533", "reference": "WS-76990"}, "documents received": ["Single-page final backup confirmation for retired server ZL-17533, dated 18 February 2026, signed by the backup operator.", "Single-page data wipe certificate for retired server ZL-17533, dated 22 February 2026, signed by the data sanitisation technician.", "Single-page asset register update for retired server ZL-17533, dated 8 March 2026.", "Single-page licence reassignment note for retired server ZL-17533; the issue date is smudged and cannot be read. The note is signed by the licence administrator.", "Decommission request form for retired server ZL-17533, dated 19 December 2025, 2 pages, complete, signed by the requesting system owner.", "Single-page network disconnection confirmation for retired server ZL-17533, dated 3 March 2026, signed by the network engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00077-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Elstham SAS", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "17 July 2026"}, "checklist": ["Payment gateway technical specification for the gateway, on file.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review.", "Test environment transaction log, issued within the last 1 months.", "Data protection impact assessment, issued within the last 12 months, signed.", "Gateway integration request form, signed."], "submission": {"case": {"name": "payment gateway FY-30649", "reference": "NK-85955", "details": ["The gateway will not store customers' card details."]}, "documents received": ["Gateway integration request form for payment gateway FY-30649, dated 9 April 2026, signed by the requesting manager. 2 pages, complete.", "Data protection impact assessment for payment gateway FY-30649, dated 12 October 2025, signed by the Data Protection Officer. 5 pages, complete.", "Test environment transaction log for payment gateway FY-30649, dated 27 June 2026. 4 pages, complete.", "Payment gateway technical specification for payment gateway FY-30649, dated 28 March 2026. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 698}} {"id": "isc-te-00021-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Veybrook Group", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "18 March 2026"}, "checklist": ["Movers insurance certificate, valid (not expired) on the date of the review.", "Furniture inventory list, issued within the last 1 months, signed.", "New floor snagging list, issued within the last 1 months, signed.", "Lifting equipment inspection report, issued within the last 6 months, signed.", "Signed move plan, signed.", "Parking bay suspension approval, issued within the last 1 months, signed."], "submission": {"case": {"name": "office move project LO-48164", "reference": "TD-37447"}, "documents received": ["New floor snagging list for office move project LO-48164. It shows its date of issue as 14 March 2026. It is 3 pages, complete. It is signed by the site inspector.", "Parking bay suspension approval for office move project LO-48164. It shows its date of issue as 1 March 2026. It is a single page. It is signed by the highways officer.", "Furniture inventory list for office move project LO-48164. It shows its date of issue as 4 March 2026. It is 4 pages, complete. It is signed by the facilities coordinator.", "Lifting equipment inspection report for office move project LO-48164. It shows its date of issue as 13 January 2026. It is 2 pages, complete. It is signed by the lifting equipment inspector.", "IT decommissioning certificate for office move project LO-48164. It shows its date of issue as 14 March 2026. It is a single page. It is signed by the IT support lead.", "Movers insurance certificate for office move project LO-48164. It shows its expiry date as 7 October 2027. It is a single page.", "Draft move plan with no approval signature for office move project LO-48164. It shows its date of issue as 22 February 2026. It is 6 pages, complete. It is signed by the move project manager.", "Signed move plan for office move project LO-48164. It shows its date of issue as 22 February 2026. It is 6 pages, complete. It is signed by the move project manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 939}} {"id": "isc-te-00380-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Weskthorpe LLP", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "18 May 2026"}, "checklist": ["Plant room access sign-in sheet.", "Asset condition photograph sheet, issued within the last 1 months.", "If the system contains more than 5 tonnes of refrigerant, also: fixed leak detection test certificate, issued within the last 6 months, signed.", "Refrigerant top-up log, issued within the last 1 months, signed.", "System pressure test results, issued within the last 1 months, signed."], "submission": {"case": {"name": "air conditioning system SP-87357", "reference": "XS-20787", "details": ["The system contains 5 tonnes of refrigerant or less."]}, "documents received": ["Engineer's service report for air conditioning system SP-87357. Dated 15 May 2026. 3 pages, complete. Signed by the service engineer.", "Refrigerant top-up log for air conditioning system SP-87357. Dated 5 May 2026. 1 page. Signed by the refrigeration engineer.", "Asset condition photograph sheet for air conditioning system SP-87357. Dated 9 May 2026. 2 pages, complete.", "Plant room access sign-in sheet for air conditioning system SP-87357. Dated 24 April 2026. 1 page.", "System pressure test results for air conditioning system SP-87357. Dated 8 May 2026. 2 pages, complete. Signed by the commissioning engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 761}} {"id": "isc-te-00113-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Xanwald SAS", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "24 June 2026"}, "checklist": ["System pressure test results, issued within the last 1 months, signed", "If the system contains more than 5 tonnes of refrigerant, also: fixed leak detection test certificate, issued within the last 6 months, signed", "Plant room access sign-in sheet", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "Thermostat calibration certificate, issued within the last 12 months", "Asset condition photograph sheet, issued within the last 1 months"], "submission": {"case": {"name": "air conditioning system PS-44263", "reference": "MV-14815", "details": ["The system contains more than 5 tonnes of refrigerant."]}, "documents received": ["PS-44263_engineer_F_gas_handling_certificate_20102028.pdf. Engineer F-gas handling certificate for air conditioning system PS-44263, showing an expiry date of 20 October 2028. 1 page.", "PS-44263_thermostat_calibration_certificate_160725.pdf. Thermostat calibration certificate for air conditioning system PS-44263, dated 16 July 2025. 1 page.", "PS-44263_plant_room_access_sign_in_sheet_120526.pdf. Plant room access sign-in sheet for air conditioning system PS-44263, dated 12 May 2026. 1 page.", "PS-44263_refrigerant_top_up_log_140626.pdf. Refrigerant top-up log for air conditioning system PS-44263, dated 14 June 2026. 1 page. Signed by the attending refrigeration engineer.", "PS-44263_system_pressure_test_results_070626.pdf. System pressure test results for air conditioning system PS-44263, dated 7 June 2026. 2 pages, complete. Signed by the commissioning engineer.", "PS-44263_asset_condition_photograph_sheet_030626.pdf. Asset condition photograph sheet for air conditioning system PS-44263, dated 3 June 2026. 2 pages, complete.", "PS-44263_fixed_leak_detection_test_certificate_010226.pdf. Fixed leak detection test certificate for air conditioning system PS-44263, dated 1 February 2026. 2 pages, complete. Signed by the leak detection engineer."]}}, "question": {"type": "choice", "instructions": "The task is to decide whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete if every applicable line is met (extra documents do not matter). Answer incomplete if at least one applicable line is not met. Answer unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-70", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1002}} {"id": "isc-te-00027-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Nordlock BV", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "29 June 2026"}, "checklist": ["Check the line manager opinion note: it must have been issued within the last 2 months and be signed.", "Check the impact assessment on the team: it must be signed.", "Check the previous flexible working requests record: it must have been issued within the last 24 months.", "Check the current working pattern statement: it must have been issued within the last 3 months.", "Check the flexible working request form: it must be signed.", "Check the client or service impact statement: it must be signed."], "submission": {"case": {"name": "Folake Nebbski", "reference": "EQ-64109"}, "documents received": ["Line manager opinion note about Folake Nebbski. It shows its date of issue as 2 June 2026, and it is signed by the line manager. 2 pages, complete.", "Client or service impact statement about Folake Nebbski. It shows its date of issue as 7 April 2026, and it is signed by the line manager. It is 1 page.", "Current working pattern statement about Folake Nebbski. It shows its date of issue as 2 May 2026. It is 1 page.", "Flexible working request form about Folake Nebbski. It shows its date of issue as 14 June 2026, and it is signed by Folake Nebbski. 3 pages, complete.", "Previous flexible working requests record about Folake Nebbski. The date on it is smudged and cannot be read. It is 1 page.", "Impact assessment on the team about Folake Nebbski. It shows its date of issue as 29 May 2026, and it is signed by the line manager. 3 pages, complete.", "Proposed working pattern plan about Folake Nebbski. It shows its date of issue as 14 March 2026, and it is signed by Folake Nebbski. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete when measured against the checklist. Go over every checklist line relevant to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, contain all its pages, carry a signature wherever the checklist asks for one, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': all applicable lines are met (extra documents do not matter). 'incomplete': at least one applicable line is unmet. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-45", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 858}} {"id": "isc-te-00177-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vaskness Limited", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "29 July 2026"}, "checklist": ["Flight availability printout, issued within the last 1 months", "Hotel availability printout, issued within the last 1 months, signed", "Passport details form, signed", "Special requests note, signed", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review", "Travel insurance quote, issued within the last 1 months"], "submission": {"case": {"name": "holiday booking BX-25277", "reference": "CW-76801", "details": ["The booking includes a child traveller."]}, "documents received": ["Booking request form for holiday booking BX-25277, dated 12 April 2026. 2 pages, complete. Signed by the lead traveller.", "Child passport copy for holiday booking BX-25277, showing an expiry date of 2 December 2028. 1 page.", "Travel insurance quote for holiday booking BX-25277, dated 12 July 2026. 2 pages, complete.", "Passport details form for holiday booking BX-25277, dated 9 May 2026. 1 page. Signed by the lead traveller.", "Flight availability printout for holiday booking BX-25277, dated 12 July 2026. 2 pages, complete.", "Travel insurance quote for holiday booking BX-25277, dated 3 February 2025. 2 pages, complete.", "Hotel availability printout for holiday booking BX-25277, dated 17 July 2026. 2 pages, complete. Signed by the reservations manager.", "Special requests note for holiday booking BX-25277, dated 23 April 2026. 1 page. Signed by the lead traveller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 830}} {"id": "isc-te-00182-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Faldfell Ltd", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "11 March 2026"}, "checklist": ["Licence reassignment note issued within the last 3 months, signed.", "Asset register update issued within the last 1 months.", "Data wipe certificate issued within the last 3 months, signed.", "Final backup confirmation issued within the last 3 months, signed.", "Decommission request form, signed."], "submission": {"case": {"name": "retired server ZL-17533", "reference": "WS-76990"}, "documents received": ["Single-page network disconnection confirmation for retired server ZL-17533, dated 3 March 2026, signed by the network engineer.", "Single-page final backup confirmation for retired server ZL-17533, dated 18 February 2026, signed by the backup operator.", "Single-page data wipe certificate for retired server ZL-17533, dated 22 February 2026, signed by the data sanitisation technician.", "Single-page asset register update for retired server ZL-17533, dated 8 March 2026.", "Decommission request form for retired server ZL-17533, dated 19 December 2025, 2 pages, complete, signed by the requesting system owner.", "Single-page licence reassignment note for retired server ZL-17533, dated 28 December 2025, signed by the licence administrator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 736}} {"id": "isc-te-00488-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Dravwood & Co", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "22 May 2026"}, "checklist": ["Breach evidence log, issued within the last 1 month and signed", "Original service agreement copy", "Losses calculation statement, issued within the last 1 month and signed", "If the defaulting party is a public sector body, also: public sector termination approvals record, issued within the last 3 months and signed", "If the contract requires a dispute to go to mediation first, also: mediation request confirmation, issued within the last 1 month and signed", "Default notice previously served, issued within the last 6 months and signed"], "submission": {"case": {"name": "Bravberg SAS", "reference": "YW-54965", "details": ["The defaulting party is a public sector body.", "The contract allows termination without prior mediation."]}, "documents received": ["Breach evidence log for Bravberg SAS, dated 13 May 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Public sector termination approvals record for Bravberg SAS, dated 28 March 2026. 2 pages, complete. Signed by the head of procurement.", "Default notice previously served on Bravberg SAS, dated 21 December 2025. Single page. Signed by the contracts manager.", "Original service agreement copy relating to Bravberg SAS, dated 22 March 2026. Pages 1-2 of 10 are included.", "Termination notice draft for Bravberg SAS, dated 28 March 2026. 2 pages, complete. Signed by the senior legal counsel.", "Losses calculation statement for Bravberg SAS, dated 8 May 2026. 3 pages, complete. Signed by the finance manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 791}} {"id": "isc-te-00248-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Aldston BV", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "27 July 2026"}, "checklist": ["benefit entitlement letters issued within the last 12 months", "support plan, signed", "safeguarding referral form issued within the last 12 months, signed", "If the adult lacks capacity to make the decision about their care arrangements, also: best interests decision record, signed", "capacity assessment record, signed", "recent bank statements issued within the last 3 months", "proof of identity valid (not expired) on the date of the review"], "submission": {"case": {"name": "Elena Lundton", "reference": "VW-56695", "details": ["The adult lacks capacity to make the decision about their care arrangements."]}, "cover note": "I have put this pack together for review, but I am not sure everything needed is there. Please let me know if anything else is required. Brooke Yellopoulos", "documents received": ["Safeguarding referral form. The document concerns Elena Lundton and shows its date of issue as 23 December 2025. 2 pages, complete. It is signed by the safeguarding lead officer.", "Proof of identity. The document concerns Elena Lundton and shows its expiry date as 10 November 2027. It is a single page.", "Benefit entitlement letters. The document concerns Elena Lundton and shows its date of issue as 19 July 2026. 2 pages, complete.", "Recent bank statements. The document concerns Elena Lundton and shows its date of issue as 21 June 2026. 8 pages, complete.", "Needs assessment report. The document concerns Elena Lundton and shows its date of issue as 16 May 2026. 12 pages, complete. It is signed by the needs assessor.", "Support plan. The document concerns Elena Lundton and shows its date of issue as 20 April 2026. 6 pages, complete. It is signed by the care coordinator.", "Capacity assessment record. The document concerns Elena Lundton and shows its date of issue as 9 April 2026. 4 pages, complete. It is signed by the capacity assessor.", "Financial assessment form. The document concerns Elena Lundton and shows its date of issue as 17 July 2026. 6 pages, complete. It is signed by the financial assessment officer.", "Best interests decision record. The document concerns Elena Lundton and shows its date of issue as 5 July 2026. 4 pages, complete. It is signed by the best interests assessor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 972}} {"id": "isc-te-00400-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravby plc", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "12 March 2026"}, "checklist": ["Inbound unloading record, issued within the last 1 months and signed.", "Damaged goods exception sheet, issued within the last 1 months and signed.", "Load consolidation sheet, issued within the last 3 months and signed.", "Outbound loading record, issued within the last 1 months and signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet, issued within the last 1 months and signed.", "Transfer manifest, signed.", "Cross-dock slot booking sheet, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer CF-57678", "reference": "AQ-93363", "details": ["The transfer includes a temperature-controlled load."]}, "documents received": ["Cross-dock-slot-booking-sheet-CF-57678.pdf. A cross-dock slot booking sheet for cross-dock transfer CF-57678, dated 7 March 2026. Single page, signed by the cross-dock coordinator.", "Cross-dock-chiller-unit-check-sheet-CF-57678.pdf. A cross-dock chiller unit check sheet for cross-dock transfer CF-57678, dated 6 March 2026. Single page, signed by the refrigeration technician.", "Outbound-loading-record-CF-57678.pdf. An outbound loading record for cross-dock transfer CF-57678, dated 4 March 2026. Single page, signed by the loading bay operator.", "Damaged-goods-exception-sheet-CF-57678.pdf. A damaged goods exception sheet for cross-dock transfer CF-57678, dated 9 March 2026. Single page, signed by the shift supervisor.", "Load-consolidation-sheet-CF-57678.pdf. A load consolidation sheet for cross-dock transfer CF-57678, dated 19 January 2026. 2 pages, complete, signed by the load planner.", "Transfer-manifest-CF-57678.pdf. A transfer manifest for cross-dock transfer CF-57678, dated 21 November 2025. 3 pages, complete, signed by the transport planner."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete: every applicable line is met (extra documents do not matter). Reply incomplete: at least one applicable line is not met. Reply unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-15", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 936}} {"id": "isc-te-00082-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Larvcourt Inc", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "29 July 2026"}, "checklist": ["Localisation completeness report, issued within the last 1 month", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months and signed", "Marketing screenshot pack", "Privacy policy update, issued within the last 3 months", "If the mobile app release adds a new payment feature, also: payment provider compliance checklist, issued within the last 3 months and signed", "Store listing description, issued within the last 1 month", "Age rating questionnaire, signed"], "submission": {"case": {"name": "mobile app release GK-81797", "reference": "ZI-76687", "details": ["The mobile app release includes third-party analytics.", "The mobile app release adds a new payment feature."]}, "documents received": ["age-rating-questionnaire-GK-81797.pdf — Age rating questionnaire for mobile app release GK-81797. It shows its date of issue as 17 April 2026. 2 pages, complete, signed by the Mobile Release Manager.", "store-listing-description-GK-81797.pdf — Store listing description for mobile app release GK-81797. It shows its date of issue as 15 July 2026. It is 1 page.", "privacy-policy-update-GK-81797.pdf — Privacy policy update for mobile app release GK-81797. The date of issue is smudged and cannot be read. 2 pages, complete.", "release-notes-GK-81797.pdf — Release notes for mobile app release GK-81797. It shows its date of issue as 17 July 2026. 2 pages, complete.", "marketing-screenshot-pack-GK-81797.pdf — Marketing screenshot pack for mobile app release GK-81797. It shows its date of issue as 31 May 2026. 6 pages, complete.", "analytics-data-consent-statement-GK-81797.pdf — Analytics data consent statement for mobile app release GK-81797. It shows its date of issue as 29 June 2026. It is 1 page, signed by the Data Protection Officer.", "payment-provider-compliance-checklist-GK-81797.pdf — Payment provider compliance checklist for mobile app release GK-81797. It shows its date of issue as 4 July 2026. 3 pages, complete, signed by the Payments Lead.", "localisation-completeness-report-GK-81797.pdf — Localisation completeness report for mobile app release GK-81797. It shows its date of issue as 23 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Your task is to judge the pack against the checklist. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Say complete if every applicable line is met (extra documents do not matter). Say incomplete if at least one applicable line is not met. Say unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-24", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1048}} {"id": "isc-te-00192-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Glenthorpe Inc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "3 April 2026"}, "checklist": ["Shareholder register extract issued within the last 3 months.", "Beneficial owner identification form, signed.", "Certificate of incorporation.", "Company tax registration certificate.", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents.", "Board resolution to open the account, signed.", "Company statutes, signed."], "submission": {"case": {"name": "Austshaw LLP", "reference": "DH-79163", "details": ["All beneficial owners of the company are residents."]}, "documents received": ["Company tax registration certificate - Austshaw LLP.pdf\nA company tax registration certificate for Austshaw LLP, dated 31 December 2025. Single page.", "Shareholder register extract - Austshaw LLP.pdf\nA shareholder register extract for Austshaw LLP, dated 25 December 2025. 2 pages, complete.", "Beneficial owner identification form - Austshaw LLP.pdf\nA beneficial owner identification form for Austshaw LLP, dated 25 March 2026. 3 pages, complete. It is signed by a beneficial owner.", "Company statutes - Austshaw LLP.pdf\nCompany statutes for Austshaw LLP, dated 19 February 2026. 12 pages, complete. It is signed by a director.", "Board resolution to open the account - Austshaw LLP.pdf\nA board resolution to open the account for Austshaw LLP, dated 2 February 2026. Single page. It is signed by a director.", "Certificate of incorporation - Austshaw LLP.pdf\nA certificate of incorporation for Austshaw LLP, dated 6 January 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 768}} {"id": "isc-te-00170-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Ebrshaw Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "13 April 2026"}, "checklist": ["Proposed architecture diagram", "Migration and rollout plan", "Review board feedback summary (issued within the last 3 months, signed)", "Problem statement page", "Cost estimate sheet (issued within the last 6 months)", "If the design introduces a new third-party dependency, also: third-party dependency risk assessment (issued within the last 6 months, signed)", "If the design changes how customer data is stored, also: data protection review sign-off (signed)"], "submission": {"case": {"name": "design document UC-75490", "reference": "AO-68653", "details": ["The design introduces no new third-party dependency.", "The design does not change how customer data is stored."]}, "documents received": ["Problem statement page for design document UC-75490, dated 19 March 2026. 2 pages, complete.", "Migration and rollout plan for design document UC-75490, dated 22 March 2026. 3 pages, complete.", "Cost estimate sheet for design document UC-75490, dated 20 February 2026. 2 pages, complete.", "Proposed architecture diagram for design document UC-75490, dated 21 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 702}} {"id": "isc-te-00213-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Bravhaven Partners", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "6 July 2026"}, "checklist": ["Council flood warning notice, issued within the last 12 months", "Loss adjuster's inspection report, issued within the last 6 months and signed", "Debris removal invoice, issued within the last 6 months", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "Buildings insurance policy schedule"], "submission": {"case": {"name": "property OD-78962", "reference": "ZY-65584"}, "documents received": ["council_flood_warning_notice_OD-78962.pdf - Council flood warning notice about property OD-78962. Dated 3 April 2026. 1 page.", "debris_removal_invoice_OD-78962.pdf - Debris removal invoice about property OD-78962. Dated 19 January 2026. 1 page.", "flood_claim_form_OD-78962.pdf - Flood claim form about property OD-78962. Dated 9 April 2026. 5 pages, complete. Signed by the policyholder.", "loss_adjusters_inspection_report_OD-78962_v3.pdf - Loss adjuster's inspection report about property OD-78962. Dated 4 April 2026. 6 pages, complete. Signed by the loss adjuster.", "photographs_of_flood_water_in_the_rooms_OD-78962.pdf - Photographs of flood water in the rooms about property OD-78962. Dated 21 June 2026. 3 pages, complete.", "utility_suppliers_letter_OD-78962.pdf - Utility supplier's letter confirming the supply was cut off about property OD-78962. Dated 9 September 2025. 1 page.", "buildings_insurance_policy_schedule_OD-78962.pdf - Buildings insurance policy schedule about property OD-78962. Dated 10 March 2026. 5 pages, complete."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete: every applicable line is met (extra documents do not matter). Answer incomplete: at least one applicable line is not met. Answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-13", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 901}} {"id": "isc-te-00369-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Iskmark GmbH", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "7 September 2026"}, "checklist": ["Confirm the pack contains a travel policy extract showing advance eligibility.", "Confirm the pack contains a payroll deduction agreement for recovery of the advance, signed.", "Confirm the pack contains an outstanding advance clearance check, signed.", "Confirm the pack contains a costed trip estimate sheet, signed and issued within the last 3 months.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Confirm the pack contains a travel advance request form, signed."], "submission": {"case": {"name": "Matteo Mundham", "reference": "VW-11525", "details": ["The requested advance is above the standard advance limit."]}, "documents received": ["Travel advance request form. Issued 2 August 2026, 1 page. Signed by Matteo Mundham, requesting the travel advance.", "Line manager approval for the advance. Issued 13 June 2026, 1 page. Signed by the line manager, approving the advance for Matteo Mundham.", "Payroll deduction agreement for recovery of the advance. Issued 25 August 2026, 1 page. Signed by Matteo Mundham, agreeing that the advance will be recovered from pay.", "Outstanding advance clearance check. Issued 19 August 2026, 1 page. Signed by the payroll administrator, confirming the check on outstanding advances for Matteo Mundham.", "Travel policy extract showing advance eligibility. Issued 30 June 2026, 1 page. The extract shows that Matteo Mundham is eligible for a travel advance.", "Costed trip estimate sheet. Issued 4 August 2026, 1 page. Signed by Matteo Mundham, listing the estimated costs for the trip.", "Trip itinerary and approval. Issued 22 August 2026, 2 pages, complete. Signed by the line manager, approving the itinerary for Matteo Mundham's trip."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 833}} {"id": "isc-te-00443-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Yondfield Group", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "16 April 2026"}, "checklist": ["Problem statement page", "Cost estimate sheet issued within the last 6 months", "Capacity and load estimate issued within the last 6 months", "Alternatives considered table"], "submission": {"case": {"name": "design document ZP-11113", "reference": "XV-29298"}, "documents received": ["Capacity and load estimate for design document ZP-11113, dated 19 February 2026. 3 pages, complete.", "Review board feedback summary for design document ZP-11113, dated 2 March 2026. 2 pages, complete. Signed by the review board chair.", "Problem statement page for design document ZP-11113, dated 6 March 2026. 2 pages, complete.", "Migration and rollout plan for design document ZP-11113, dated 20 February 2026. 3 pages, complete.", "Alternatives considered table for design document ZP-11113, dated 16 February 2026. Pages 1-1 of 2 are included.", "Cost estimate sheet for design document ZP-11113, dated 6 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Go through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-49", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 708}} {"id": "isc-te-00265-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Ilvvale LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "6 April 2026"}, "checklist": ["Booking voucher, issued within the last 6 months", "Vehicle condition report, signed", "Passport, valid (not expired) on 6 April 2026, signed", "Additional driver authorisation form, signed", "Credit card in the driver's name, valid (not expired) on 6 April 2026, signed", "Driving licence, valid (not expired) on 6 April 2026, signed", "If the booking includes crossing a land border, also: cross-border travel permission, signed"], "submission": {"case": {"name": "Lucy Bixisey", "reference": "OV-98787", "details": ["The booking stays within one country."]}, "documents received": ["fuel_policy_sheet_ov98787.pdf — Fuel policy sheet for Lucy Bixisey. It shows its date of issue as 20 February 2026. It is a single page. It is signed by the branch counter staff member.", "additional_driver_authorisation_form_ov98787.pdf — Additional driver authorisation form for Lucy Bixisey. It shows its date of issue as 16 December 2025. It is a single page. It is signed by the named driver.", "vehicle_condition_report_ov98787.pdf — Vehicle condition report for Lucy Bixisey. It shows its date of issue as 3 March 2026. It is 2 pages, complete. It is signed by the inspecting staff member.", "credit_card_ov98787.pdf — Credit card in the driver's name for Lucy Bixisey. It shows its expiry date as 18 November 2026. It is a single page. It is signed by the cardholder.", "booking_voucher_ov98787.pdf — Booking voucher for Lucy Bixisey. It shows its date of issue as 20 December 2025. It is a single page.", "passport_ov98787.pdf — Passport for Lucy Bixisey. It shows its expiry date as 15 December 2027. It is a single page. It is signed by the passport holder.", "driving_licence_ov98787.pdf — Driving licence for Lucy Bixisey. It shows its expiry date as 9 October 2026. It is 2 pages, complete. It is signed by the licence holder."]}}, "question": {"type": "choice", "instructions": "Decide if the pack meets the checklist. Review each checklist line that applies to this case one by one. A required document only counts when it is the kind of document listed (not a similar one), is about the subject of the case, includes all its pages, is signed where the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-34", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 949}} {"id": "isc-te-00058-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Orrfeld plc", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "14 August 2026"}, "checklist": ["Employment income summary, issued within the last 13 months", "Childcare payment receipt, issued within the last 13 months", "Bank interest statement, issued within the last 13 months", "Gift aid donation summary", "Tax return draft printout, signed"], "submission": {"case": {"name": "household tax affairs EZ-41809", "reference": "TK-75367"}, "documents received": ["bank_interest_statement_v2.pdf. A bank interest statement about household tax affairs EZ-41809, dated 11 July 2026. Pages 1 to 3 are included; the total number of pages is not shown anywhere.", "gift_aid_donation_summary.pdf. A gift aid donation summary about household tax affairs EZ-41809, dated 4 May 2026. It is a single page.", "employment_income_summary.pdf. An employment income summary about household tax affairs EZ-41809, dated 19 July 2026. 2 pages, complete.", "tax_return_draft_printout.pdf. A tax return draft printout about household tax affairs EZ-41809, dated 20 May 2026. 6 pages, complete. It carries the signature of the household's tax filer.", "childcare_payment_receipt.pdf. A childcare payment receipt about household tax affairs EZ-41809, dated 13 October 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 748}} {"id": "isc-te-00243-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ambmont Limited", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "9 June 2026"}, "checklist": ["Check that the pack contains the invoice discrepancy log.", "Check that the pack contains the supplier response letter, issued within the last 3 months and signed.", "Check that the pack contains the quality inspection report, issued within the last 6 months and signed.", "Check that the pack contains the delivery record summary, issued within the last 12 months.", "Check that the pack contains the service level summary, issued within the last 12 months."], "submission": {"case": {"name": "Ilvwood Limited", "reference": "AY-23034"}, "documents received": ["Quality inspection report for Ilvwood Limited, dated 7 June 2026. 3 pages, complete. Signed by the quality inspector.", "Delivery record summary for Ilvwood Limited, dated 5 March 2026. 2 pages, complete.", "Invoice discrepancy log for Ilvwood Limited, dated 24 March 2026. 2 pages, complete.", "Service level summary for Ilvwood Limited, dated 25 June 2025. Single page.", "Supplier response letter for Ilvwood Limited, dated 29 May 2026. Single page; the part where a signature would be cannot be seen, as a sticky note covers the signature block, so it is not known whether it is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-65", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 704}} {"id": "isc-te-00442-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Hesklund Group", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "9 March 2026"}, "checklist": ["Alerting rules review note, issued within the last 3 months.", "Remediation items list, issued within the last 3 months, signed.", "Postmortem meeting minutes, issued within the last 3 months, signed.", "Service level objective breach record, issued within the last 3 months."], "submission": {"case": {"name": "production incident SQ-16361", "reference": "TM-87011"}, "cover note": "I apologise that this pack was put together in a rush.", "documents received": ["remediation-items-list-SQ-16361.pdf — Remediation items list for production incident SQ-16361, dated 7 February 2026. 2 pages, complete. Signed by the reliability engineering team lead.", "alerting-rules-review-note-SQ-16361.pdf — Alerting rules review note for production incident SQ-16361, dated 27 January 2026. 2 pages, complete.", "service-level-objective-breach-record-SQ-16361.pdf — Service level objective breach record for production incident SQ-16361, dated 26 December 2025. Single page.", "postmortem-meeting-minutes-SQ-16361-171225.pdf — Postmortem meeting minutes for production incident SQ-16361, dated 17 December 2025. 3 pages, complete. Signed by the reliability engineering team lead."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Consider every checklist line that applies to this case. A required document counts only when it is the kind of document listed (not a similar one), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it has not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "variant-4", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00220-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Vaskheim plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "29 June 2026"}, "checklist": ["Company registration certificate on file.", "Bank reference letter on file, issued within the last 6 months and signed.", "Credit limit approval memo on file, issued within the last 1 months and signed.", "Credit reference agency report on file, issued within the last 3 months.", "Signed credit terms agreement on file, signed."], "submission": {"case": {"name": "Tondston Group", "reference": "EP-62790"}, "documents received": ["scan-0847.pdf - The contents of this file cannot be seen: the scan is blank and too faint to read.", "bank-reference-letter.pdf - Bank reference letter for Tondston Group. Date of issue: 10 January 2026. Single page, signed by the bank manager.", "company-registration-certificate.pdf - Company registration certificate for Tondston Group. Date of issue: 27 March 2026. 2 pages, complete.", "credit-reference-agency-report.pdf - Credit reference agency report for Tondston Tondston Group. Date of issue: 31 May 2026. 6 pages, complete.", "credit-limit-approval-memo.pdf - Credit limit approval memo for Tondston Group. Date of issue: 13 June 2026. Single page, signed by the finance director.", "signed-credit-terms-agreement.pdf - Signed credit terms agreement for Tondston Group. Date of issue: 5 June 2026. 4 pages, complete, signed by the finance director."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Review every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-71", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00454-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Jundmouth Limited", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "25 March 2026"}, "checklist": ["Licence reassignment note, issued within the last 3 months, signed", "If the server will be sold or donated rather than destroyed, also: disposal vendor certificate of destruction, issued within the last 3 months, signed", "Decommission request form, signed", "Data wipe certificate, issued within the last 3 months, signed", "Data migration confirmation, issued within the last 3 months, signed", "Dependent systems check report, issued within the last 3 months"], "submission": {"case": {"name": "retired server NC-63421", "reference": "LV-96718"}, "documents received": ["Single-page data wipe certificate for retired server NC-63421, dated 29 January 2026, signed by the disposal technician.", "Single-page licence reassignment note for retired server NC-63421, dated 10 March 2026, signed by the IT asset manager.", "Single-page asset register update for retired server NC-63421, dated 21 March 2026.", "Single-page disposal vendor certificate of destruction for retired server NC-63421, dated 12 January 2026, signed by the disposal vendor's representative.", "Data migration confirmation for retired server NC-63421, dated 19 January 2026. 2 pages, complete. Signed by the systems migration lead.", "Dependent systems check report for retired server NC-63421, dated 13 March 2026. 3 pages, complete.", "Decommission request form for retired server NC-63421, dated 4 February 2026. 2 pages, complete. Signed by the infrastructure operations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 807}} {"id": "isc-te-00370-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Cindford BV", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "12 August 2026"}, "checklist": ["Employment certificate, issued within the last 1 months and signed", "Photo identity document, valid (not expired) on the date of the review", "Property valuation report, issued within the last 6 months and signed", "Bank statement, issued within the last 3 months", "Credit bureau report, issued within the last 1 months", "If the property is a new build, also: new build warranty certificate"], "submission": {"case": {"name": "property YV-75629", "reference": "EX-15818", "details": ["The property is a new build."]}, "cover note": "I am not sure everything needed is in this pack.", "documents received": ["Employment certificate. It concerns property YV-75629 and shows its date of issue as 28 July 2026. It is 1 page and signed by the applicant's employer.", "New build warranty certificate. It concerns property YV-75629 and shows its date of issue as 27 June 2026. It is 3 pages, complete.", "Property valuation report. It concerns property YV-75629 and shows its date of issue as 25 February 2026. It is 10 pages, complete, and signed by the valuer.", "Bank statement. It concerns property YV-75629 and shows its date of issue as 22 June 2026. It is 3 pages, complete.", "Credit bureau report. It concerns property YV-75629 and shows its date of issue as 22 July 2026. It is 4 pages, complete.", "Photo identity document. It concerns property YV-75629 and shows its expiry date as 4 November 2028. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Decide if the pack meets the checklist. Review each checklist line that applies to this case one by one. A required document only counts when it is the kind of document listed (not a similar one), is about the subject of the case, includes all its pages, is signed where the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-34", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00053-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Gravmark plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "1 May 2026"}, "checklist": ["Account closure procedure is included in the pack.", "Account purpose statement is included in the pack.", "Platform terms acceptance record, signed, is included in the pack.", "Content escalation route, signed, is included in the pack.", "Naming convention approval, signed, is included in the pack."], "submission": {"case": {"name": "new social media account UG-91608", "reference": "FX-57324"}, "documents received": ["content_escalation_route_UG-91608.pdf - Content escalation route for new social media account UG-91608. Its date of issue is 7 January 2026. It is 1 page. It is signed by the social media governance team lead.", "account_closure_procedure_UG-91608.pdf - Account closure procedure for new social media account UG-91608. Its date of issue is 5 January 2026. It is 1 page.", "naming_convention_approval_UG-91608_v2.pdf - Naming convention approval for new social media account UG-91608. Its date of issue is 18 March 2026. It is 1 page. Its signature line is empty and it is not signed.", "platform_terms_acceptance_record_UG-91608.pdf - Platform terms acceptance record for new social media account UG-91608. Its date of issue is 11 March 2026. It is 1 page. It is signed by the account owner.", "admin_access_list_UG-91608.pdf - Admin access list for new social media account UG-91608. Its date of issue is 27 March 2026. It is 1 page.", "account_purpose_statement_UG-91608.pdf - Account purpose statement for new social media account UG-91608. Its date of issue is 24 March 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00188-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Fennfell Group", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "3 August 2026"}, "checklist": ["Travel advance request form, signed", "Line manager approval for the advance, signed", "Costed trip estimate sheet issued within the last 3 months, signed", "Outstanding advance clearance check, signed", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Daniel Aldwick", "reference": "RL-87051"}, "documents received": ["Payroll Deduction Agreement for Recovery of the Advance. The agreement relates to Daniel Aldwick and is dated 19 June 2026. It is a single page and is signed by the travelling employee.", "Travel Advance Request Form. The form relates to Daniel Aldwick and is dated 30 May 2026. It is a single page and is signed by the travelling employee.", "Outstanding Advance Clearance Check. The check relates to Daniel Aldwick and is dated 30 May 2026. It is a single page and is signed by the accounts payable reviewer.", "Line Manager Approval for the Advance. The approval relates to Daniel Aldwick and is dated 4 May 2026. It is a single page, but a sticky note covers the signature block, so it is not known whether it is signed.", "Costed Trip Estimate Sheet. The sheet relates to Daniel Aldwick and is dated 23 June 2026. It is a single page and is signed by the travelling employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 719}} {"id": "isc-te-00331-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Prydcourt SAS", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "5 June 2026"}, "checklist": ["Flight itinerary quote, issued within the last 1 months.", "Travel request form, signed.", "If the traveller is not a passport holder of the destination country, also: work permit confirmation.", "Visa entry requirement printout, issued within the last 3 months.", "Line manager approval, signed.", "Trip cost estimate, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Passport copy for international travel, valid (not expired) on the date of the review."], "submission": {"case": {"name": "business trip XN-31948", "reference": "DF-94343", "details": ["The traveller is not a passport holder of the destination country.", "The trip involves no country requiring a visa."]}, "cover note": "Everything needed for this pack is attached and complete.", "documents received": ["Travel policy acknowledgement for business trip XN-31948, dated 5 February 2026. 1 page. Signed by the traveller.", "Passport copy for international travel for business trip XN-31948, showing expiry date 6 August 2027. 1 page.", "Work permit confirmation for business trip XN-31948, dated 31 March 2026. 2 pages, complete.", "Trip cost estimate for business trip XN-31948, dated 20 May 2026. 1 page. Signed by the travel coordinator.", "Line manager approval for business trip XN-31948, dated 10 May 2026. 1 page. Signed by the line manager.", "Flight itinerary quote for business trip XN-31948, dated 30 May 2026. 2 pages, complete.", "Visa entry requirement printout for business trip XN-31948, dated 8 April 2026. 2 pages, complete.", "File scan_0041.pdf. The file will not open, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Decide if the pack meets the checklist. Review each checklist line that applies to this case one by one. A required document only counts when it is the kind of document listed (not a similar one), is about the subject of the case, includes all its pages, is signed where the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-34", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 876}} {"id": "isc-te-00412-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Cranhall GmbH", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "1 September 2026"}, "checklist": ["Check that the placement learning plan is included and signed.", "If the intern is under 18 years old, also check that the parent or guardian consent form is included and signed.", "Check that the mentor assignment note is included and signed.", "Check that the internship agreement is included and signed.", "Check that the right to work check record is included, signed, and was issued within the last 6 months."], "submission": {"case": {"name": "Thomas Wraxell", "reference": "BC-74476", "details": ["The intern is under 18 years old."]}, "documents received": ["parent_guardian_consent_wraxell.pdf - Parent or guardian consent form for Thomas Wraxell, issued 18 May 2026. 1 page. Signed by the parent or guardian.", "mentor_assignment_note_wraxell.pdf - Mentor assignment note for Thomas Wraxell, issued 25 May 2026. 1 page. Signed by the marketing operations team lead.", "right_to_work_check_wraxell_undated.pdf - Right to work check record for Thomas Wraxell. The date of issue is covered by an ink stamp and cannot be read. 1 page. Signed by the HR records officer.", "it_equipment_loan_wraxell.pdf - IT equipment loan form for Thomas Wraxell, issued 19 May 2026. 1 page. Signed by the IT support coordinator.", "placement_learning_plan_wraxell.pdf - Placement learning plan for Thomas Wraxell, issued 18 May 2026. 2 pages, complete. Signed by the marketing department supervisor.", "confidentiality_undertaking_wraxell.pdf - Confidentiality undertaking for Thomas Wraxell, issued 22 May 2026. 2 pages, complete. Signed by the intern.", "internship_agreement_wraxell.pdf - Internship agreement for Thomas Wraxell, issued 18 May 2026. 4 pages, complete. Signed by the marketing department head and the intern."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 856}} {"id": "isc-te-00286-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Zaldwyn LLP", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "18 May 2026"}, "checklist": ["Terms of sale acceptance log, issued within the last 12 months", "Chargeback response form, signed", "Signature proof of delivery, issued within the last 6 months and signed", "If the goods were delivered to an address different from the billing address, also: address verification check report, issued within the last 3 months", "Transaction record printout, issued within the last 3 months", "Delivery confirmation, issued within the last 6 months", "Fraud screening result sheet, issued within the last 3 months"], "submission": {"case": {"name": "disputed transaction MN-64545", "reference": "FE-41761", "details": ["The goods were delivered to an address different from the billing address."]}, "documents received": ["Delivery confirmation relating to disputed transaction MN-64545, dated 24 February 2026. 1 page.", "Fraud screening result sheet relating to disputed transaction MN-64545, dated 8 April 2026. 1 page.", "Terms of sale acceptance log relating to disputed transaction MN-64545, dated 26 December 2025. 1 page.", "Photograph of an unattended parcel on a doorstep relating to disputed transaction MN-64545, dated 24 December 2025. 1 page. Signed by the delivery driver.", "Customer account details page relating to disputed transaction MN-64545, dated 3 March 2026. 1 page.", "Chargeback response form relating to disputed transaction MN-64545, dated 18 April 2026. 2 pages, complete. Signed by the disputes team lead.", "Address verification check report relating to disputed transaction MN-64545, dated 10 May 2026. 1 page.", "Transaction record printout relating to disputed transaction MN-64545, dated 2 March 2026. 1 page.", "Signature proof of delivery relating to disputed transaction MN-64545, dated 24 December 2025. 1 page. Signed by the delivery driver."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 893}} {"id": "isc-te-00203-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Marlfell Limited", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "22 May 2026"}, "checklist": ["If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Photographs of the fault, issued within the last 3 months.", "Access authorisation slip, signed.", "Location details sheet.", "Parts order confirmation, issued within the last 1 months.", "Job request form, signed.", "Cost estimate, issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request WG-2235", "reference": "JG-32987", "details": ["The job involves no work at height above two metres."]}, "documents received": ["Parts order confirmation, maintenance request WG-2235. Date of issue: 13 May 2026. Single page.", "Location details sheet, maintenance request WG-2235. Date of issue: 29 April 2026. Single page.", "Photographs of the fault, maintenance request WG-2235. Date of issue: 10 May 2026. Pages 1-1 of 2 are included; page 2 is not in the pack.", "Access authorisation slip, maintenance request WG-2235. Date of issue: 1 May 2026. Single page. Signed by the site access controller.", "Risk assessment for the task, maintenance request WG-2235. Date of issue: 31 March 2026. 5 pages, complete. Signed by the assessor.", "Planned completion date sheet, maintenance request WG-2235. Date of issue: 26 March 2026. Single page. Signed by the facilities coordinator.", "Cost estimate, maintenance request WG-2235. Date of issue: 29 April 2026. 2 pages, complete. Signed by the estimating supervisor.", "Job request form, maintenance request WG-2235. Date of issue: 30 April 2026. Single page. Signed by the requesting manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 870}} {"id": "isc-te-00135-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Corvburg plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "16 September 2026"}, "checklist": ["Certified quality management system certificate, valid (not expired) on the date of the review.", "Supplier audit report, issued within the last 24 months, signed.", "Supplier self-assessment report, issued within the last 12 months, signed.", "Supplier corrective action plan, issued within the last 6 months, signed."], "submission": {"case": {"name": "Larvhall Ltd", "reference": "DV-11392"}, "cover note": "Please find attached the pack for the 16 September 2026 review. I am not sure that everything needed is in there, so let me know if anything further is required.", "documents received": ["Supplier corrective action plan for Larvhall Ltd, issued 26 June 2026, 3 pages, complete. Signed by the Larvhall quality manager.", "Supplier self-assessment report for Larvhall Ltd, issued 17 March 2026, 6 pages, complete. Signed by the Larvhall quality manager.", "Single-page certified quality management system certificate for Larvhall Ltd, showing an expiry date of 20 May 2028.", "Supplier audit report for Larvhall Ltd, issued 14 August 2026, 8 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 702}} {"id": "isc-te-00308-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Mersvik Inc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "10 March 2026"}, "checklist": ["Confirm the pack includes the guarantor consent letter, signed", "Confirm the pack includes the energy performance certificate, valid (not expired) on the date of the review", "Confirm the pack includes the stamp duty return, signed", "Confirm the pack includes the signed draft lease, signed"], "submission": {"case": {"name": "premises KB-78902", "reference": "VA-57606"}, "documents received": ["Signed Draft Lease for premises KB-78902, reference VA-57606, dated 17 December 2025. It is 12 pages, complete, and is signed by both the landlord and the tenant.", "Energy Performance Certificate for premises KB-78902, reference VA-57606, showing an expiry date of 26 June 2026. It is 1 page.", "Stamp Duty Return for premises KB-78902, reference VA-57606, dated 16 January 2026. It is 2 pages, complete. The signature line is empty, so it is not signed.", "Guarantor Consent Letter, dated 23 December 2025, for premises KB-78902, reference VA-57606. It is 1 page and carries the guarantor's signature."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 713}} {"id": "isc-te-00103-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Pravness plc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "12 March 2026"}, "checklist": ["If the company operates in a cash-intensive trade, also: cash handling policy (signed)", "company tax registration certificate", "authorised signer identity document (valid (not expired) on the date of the review)", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents", "company statutes (signed)", "certificate of incorporation", "beneficial owner identification form (signed)", "shareholder register extract (issued within the last 3 months)"], "submission": {"case": {"name": "Maldwald LLP", "reference": "NL-50519", "details": ["The company does not operate in a cash-intensive trade.", "All beneficial owners of the company are residents."]}, "documents received": ["Company tax registration certificate for Maldwald LLP, dated 18 December 2025. Single page.", "Board resolution to open the account for Maldwald LLP, dated 14 December 2025. Single page. Signed by the chair of the board.", "Beneficial owner identification form for Maldwald LLP, dated 11 February 2026. 3 pages, complete. Signed by a beneficial owner.", "Certificate of incorporation for Maldwald LLP, dated 13 January 2026. Single page.", "Company statutes for Maldwald LLP, dated 24 January 2026. 12 pages, complete. Signed by a managing partner.", "Authorised signer identity document for Maldwald LLP, showing an expiry date of 9 January 2027. Single page.", "Proof of registered office address for Maldwald LLP, dated 17 February 2026. Single page.", "Shareholder register extract for Maldwald LLP, dated 5 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "signed", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 609}} {"id": "isc-te-00094-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Yarvmoor Ltd", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "3 March 2026"}, "checklist": ["Peer review checklist, issued within the last 1 months, signed", "Business justification memo, issued within the last 3 months, signed", "Firewall change request form, signed", "Risk assessment, issued within the last 3 months, signed", "Post-change test plan, signed", "If the change is planned during the year-end close period, also: freeze period exception approval, signed"], "submission": {"case": {"name": "firewall change LC-56285", "reference": "RF-86349", "details": ["The change is planned during the year-end close period."]}, "cover note": "Hello, a colleague has already checked this pack over. Kind regards, Matthias Vellard", "documents received": ["Post-change_test_plan_LC-56285.pdf — Post-change test plan for firewall change LC-56285, dated 20 February 2026. It has 2 pages, complete, and is signed by the test plan author.", "Business_justification_memo_LC-56285.pdf — Business justification memo for firewall change LC-56285, dated 16 January 2026. It is a single page, signed by the requesting business owner.", "Peer_review_checklist_LC-56285.pdf — Peer review checklist for firewall change LC-56285, dated 16 February 2026. It is a single page, signed by the peer reviewer.", "Risk_assessment_LC-56285.pdf — Risk assessment for firewall change LC-56285, dated 6 February 2026. It has 2 pages, complete, and is signed by the risk assessor.", "Firewall_change_request_form_LC-56285.pdf — Firewall change request form for firewall change LC-56285, dated 24 November 2025. It has 3 pages, complete, and is signed by the requesting firewall engineer.", "Proposed_rule_change_specification_LC-56285.pdf — Proposed rule change specification for firewall change LC-56285, dated 13 November 2025. It has 2 issued within the last 3 months, complete, and is signed by the rule change author."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 922}} {"id": "isc-te-00167-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Orrwell Limited", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "14 April 2026"}, "checklist": ["Identity verification document (valid, not expired, on the date of the review)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Marketing consent form (signed)", "Customer contact details sheet (signed)", "Initial points balance statement (issued within the last 3 months)", "Loyalty scheme enrolment form (signed)"], "submission": {"case": {"name": "Brooke Ullstad", "reference": "VX-71748", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Marketing consent form VX-71748_d2.pdf. A one-page marketing consent form for Brooke Ullstad, dated 20 February 2026. The form is signed by the customer.", "Initial points balance statement VX-71748_d4.pdf. A one-page initial points balance statement for Brooke Ullstad, dated 10 March 2026.", "Customer contact details sheet VX-71748_d3.pdf. A one-page customer contact details sheet for Brooke Ullstad, dated 29 March 2026. The sheet is signed by the customer.", "Loyalty scheme enrolment form VX-71748_d5.pdf. A one-page loyalty scheme enrolment form for Brooke Ullstad, dated 8 January 2026. The form is signed by the customer.", "Terms and conditions acceptance sheet VX-71748_d8.pdf. A one-page terms and conditions acceptance sheet for Brooke Ullstad, dated 2 February 2026. The sheet is signed by the customer.", "Identity verification document VX-71748_d10.pdf. A one-page identity verification document for Brooke Ullstad. It shows an expiry date of 7 April 2026."]}}, "question": {"type": "choice", "instructions": "Judge the pack against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "expired", "defect": "expired before the review", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-36", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00371-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ambbrook Limited", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "4 June 2026"}, "checklist": ["Signature verification record, signed", "Lost card declaration, signed", "Fraud questionnaire, signed", "Photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Zeynep Fitzisey", "reference": "OJ-28573"}, "documents received": ["Delivery address confirmation for Zeynep Fitzisey. Date of issue: 11 February 2026. 1 page. Signed by the cardholder.", "Fraud questionnaire for Zeynep Fitzisey. Date of issue: 14 March 2026. 2 pages, complete. Signed by the cardholder.", "Lost card declaration for Francesca Ingridge. Date of issue: 25 May 2026. 1 page. Signed by Francesca Ingridge.", "Photo identification for Zeynep Fitzisey. Expiry date: 23 July 2026. 1 page.", "Signature verification record for Zeynep Fitzisey. Date of issue: 4 April 2026. 1 page. Signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Go through all checklist lines that apply to this case. To count, a required document must be the kind of document listed rather than a similar one, must be about the subject of the case, must have all its pages, must be signed wherever the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-62", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 675}} {"id": "isc-te-00245-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Silvik Ltd", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "1 April 2026"}, "checklist": ["Support plan, signed.", "Safeguarding referral form, issued within the last 12 months, signed.", "Benefit entitlement letters, issued within the last 12 months.", "Recent bank statements, issued within the last 3 months.", "Capacity assessment record, signed."], "submission": {"case": {"name": "Anna Holtard", "reference": "TU-70173"}, "documents received": ["Capacity assessment record. A capacity assessment record for Anna Holtard, dated 7 March 2026. 4 pages, complete. Signed by the approved mental capacity assessor.", "Support plan. A support plan for Anna Holtard, dated 21 December 2025. 6 pages, complete. Signed by the lead social worker.", "Financial assessment form. A financial assessment form for Anna Holtard, dated 31 January 2026. 6 pages, complete. Signed by the financial assessment officer.", "Recent bank statements. Recent bank statements for Anna Holtard, dated 27 January 2026. 8 pages, complete.", "Benefit entitlement letters. Benefit entitlement letters for Anna Holtard, dated 17 July 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 686}} {"id": "isc-te-00022-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Orrham & Co", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "26 March 2026"}, "checklist": ["Cost estimate, issued within the last 3 months and signed.", "Planned completion date sheet, signed.", "Parts order confirmation, issued within the last 1 months.", "Photographs of the fault, issued within the last 3 months.", "If the job involves working at height above two metres, also: permit to work at height, issued within the last 1 months and signed.", "Risk assessment for the task, issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request GA-62900", "reference": "IH-29832", "details": ["The job involves no work at height above two metres."]}, "cover note": "This pack was already checked by a colleague before I sent it over. Happy to help if you need anything else. Orla Knoxani", "documents received": ["cost-estimate-GA-62900.pdf - Cost estimate for maintenance request GA-62900. The date of issue is smudged and cannot be read. 2 pages, complete. Signed by the estimator.", "parts-order-confirmation-GA-62900.pdf - Parts order confirmation for maintenance request GA-62900, issued 9 March 2026. Single page.", "planned-completion-date-sheet-GA-62900.pdf - Planned completion date sheet for maintenance request GA-62900, issued 12 February 2026. Single page. Signed by the job planner.", "photographs-of-the-fault-GA-62900.pdf - Photographs of the fault for maintenance request GA-62900, issued 2 February 2026. 2 pages, complete.", "risk-assessment-for-the-task-GA-62900.pdf - Risk assessment for the task for maintenance request GA-62900, issued 18 March 2026. 5 pages, complete. Signed by the assessor."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every checklist line relevant to this case. A required document only counts if it is the kind of document listed (not a similar one), concerns the subject of the case, contains all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. Say complete: every applicable line is met (extra documents do not matter). Say incomplete: at least one applicable line is not met. Say unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-14", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 853}} {"id": "isc-te-00128-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskwick Group", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "3 April 2026"}, "checklist": ["Check that the pack contains a signed franchise agreement counterpart, signed.", "Check that the pack contains a franchise application form, signed.", "Check that the pack contains a funding agreement from a lender, signed and issued within the last 3 months.", "Check that the pack contains a training course completion certificate issued within the last 12 months.", "Check that the pack contains a fit-out cost estimate, signed and issued within the last 6 months.", "Check that the pack contains a pilot operation audit report, signed and issued within the last 6 months."], "submission": {"case": {"name": "Tondholm LLP", "reference": "WK-42460"}, "documents received": ["Funding agreement from a lender concerning Tondholm LLP, dated 11 February 2026. 6 pages, complete. Signed by the lender's authorised signatory.", "Signed franchise agreement counterpart concerning Tondholm LLP, dated 12 December 2025. 12 pages, complete. Signed by the franchisor's authorised signatory.", "Fit-out cost estimate concerning Tondholm LLP, dated 4 November 2025. 4 pages, complete. Signed by the fit-out contractor who prepared the estimate.", "Training course completion certificate concerning Tondholm LLP, dated 12 November 2025. Single page.", "Pilot operation audit report concerning Tondholm LLP, dated 13 October 2025. 8 pages, complete. The last page is cropped where the signature block would be, so it is not known whether the report is signed.", "Franchise application form concerning Tondholm LLP, dated 21 January 2026. 3 pages, complete. Signed by a partner of Tondholm LLP on behalf of the franchisee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00407-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Morvwood plc", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "9 June 2026"}, "checklist": ["If the customer auditor requests access to sub-tier supplier records, also include: sub-tier supplier records summary (issued within the last 3 months, signed)", "layout tour plan (signed)", "previous audit findings closure file (signed)", "training matrix extract (issued within the last 3 months, signed)", "calibration status summary (issued within the last 1 months, signed)", "open corrective action list (issued within the last 1 months, signed)", "audit agenda (signed)"], "submission": {"case": {"name": "customer audit visit YO-54795", "reference": "YP-28673", "details": ["The customer auditor does not request access to sub-tier supplier records."]}, "documents received": ["Calibration status summary for customer audit visit YO-54795, issued 31 May 2026. 2 pages, complete, signed by the calibration lead.", "Layout tour plan for customer audit visit YO-54795, issued 26 May 2026. Single page, signed by the quality manager.", "Previous audit findings closure file for customer audit visit YO-54795, issued 12 April 2026. 6 pages, complete, signed by the quality manager.", "Training matrix extract for customer audit visit YO-54795, issued 20 February 2025. 3 pages, complete, signed by the training coordinator.", "Audit scope statement for customer audit visit YO-54795, issued 12 March 2026. Single page, signed by the quality manager.", "Audit agenda for customer audit visit YO-54795, issued 21 February 2026. Single page, signed by the quality manager.", "Open corrective action list for customer audit visit YO-54795, issued 24 May 2026. 2 pages, complete, signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and say whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must concern the subject of the case, all its pages must be present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-0", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 860}} {"id": "isc-te-00223-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Jundbury Limited", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "14 August 2026"}, "checklist": ["Confirm that the pack contains a transfer completion confirmation issued within the last 1 months, signed.", "Confirm that the pack contains an outbound loading record issued within the last 1 months, signed.", "Confirm that the pack contains an inbound unloading record issued within the last 1 months, signed.", "Confirm that the pack contains a damaged goods exception sheet issued within the last 1 months, signed.", "Confirm that the pack contains a seal number log issued within the last 1 months, signed."], "submission": {"case": {"name": "cross-dock transfer HU-37848", "reference": "TS-97557"}, "documents received": ["seal_number_log_HU-37848_12Aug2026.pdf. Seal number log for cross-dock transfer HU-37848, dated 12 August 2026. Single page, signed by the outbound driver.", "outbound_loading_record_HU-37848_10Aug2026.pdf. Outbound loading record for cross-dock transfer HU-37848, dated 10 August 2026. Single page, signed by the outbound loading supervisor.", "inbound_unloading_record_HU-37848_5Aug2026.pdf. Inbound unloading record for cross-dock transfer HU-37848, dated 5 August 2026. Single page, signed by the inbound unloading supervisor.", "transfer_completion_confirmation_HU-37848_6Aug2026.pdf. Transfer completion confirmation for cross-dock transfer HU-37848, dated 6 August 2026. Single page; the bottom of the page is cropped, so the signature block cannot be seen and it is not known whether the document is signed.", "damaged_goods_exception_sheet_HU-37848_25Jul2026.pdf. Damaged goods exception sheet for cross-dock transfer HU-37848, dated 25 July 2026. Single page, signed by the warehouse shift supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 878}} {"id": "isc-te-00107-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Maldmont plc", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "19 August 2026"}, "checklist": ["Product catalogue declaration, signed", "Returns policy statement, signed", "Anti-money laundering questionnaire, signed", "Authorised representative ID copy, valid (not expired) on the date of the review", "Bank account verification letter, issued within the last 3 months, signed", "Proof of trading address, issued within the last 3 months", "If the seller is a sole trader rather than a company, also: sole trader statutory declaration, signed"], "submission": {"case": {"name": "Silmont Ltd", "reference": "KC-98959", "details": ["The seller is a registered company."]}, "documents received": ["Silmont Ltd - returns policy statement.pdf. A returns policy statement for Silmont Ltd, dated 11 August 2026. It runs to 2 pages, complete, and is signed by a director of Silmont Ltd.", "Silmont Ltd - product catalogue declaration.pdf. A product catalogue declaration for Silmont Ltd, dated 28 May 2026. It runs to 4 pages, complete, and is signed by a director of Silmont Ltd.", "Silmont Ltd - business registration certificate.pdf. A business registration certificate for Silmont Ltd, dated 29 May 2026. It is a single page.", "Silmont Ltd - bank account verification letter.pdf. A bank account verification letter for Silmont Ltd, dated 13 June 2026. It is a single page and is signed by a bank officer.", "Silmont Ltd - anti-money laundering questionnaire.pdf. An anti-money laundering questionnaire for Silmont Ltd, dated 22 July 2026. It runs to 3 pages, complete, and is signed by a director of Silmont Ltd.", "Silmont Ltd - authorised representative ID copy.pdf. A copy of the authorised representative's ID for Silmont Ltd, showing an expiry date of 7 October 2026. It is a single page.", "Silmont Ltd - proof of trading address 3.pdf. A proof of trading address for Silmont Ltd, dated 3 June 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack is complete per the checklist. Go over every checklist line that applies to this case. Only a document of the listed kind counts (not a similar one), and it must be about the case's subject, have all its pages, be signed wherever the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: at least one applicable line is not satisfied. unclear: no line is clearly not met, but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-9", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 877}} {"id": "isc-te-00376-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Dravstead Inc", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "10 September 2026"}, "checklist": ["Obtain the returns policy statement, signed.", "Obtain the anti-money laundering questionnaire, signed.", "Obtain the product catalogue declaration, signed.", "If the seller intends to list food or cosmetic products, also obtain the safety compliance certificate, issued within the last 12 months.", "Obtain the bank account verification letter, issued within the last 3 months and signed.", "Obtain the authorised representative ID copy, valid (not expired) on the date of the review.", "Obtain the business registration certificate."], "submission": {"case": {"name": "Aldston Partners", "reference": "TX-58075", "details": ["The seller intends to list food or cosmetic products."]}, "documents received": ["Aldston_Partners_authorised_representative_ID_copy.pdf - Authorised representative ID copy for Aldston Partners, showing an expiry date of 18 January 2029. 1 page.", "Aldston_Partners_business_registration_certificate.pdf - Business registration certificate for Aldston Partners, dated 23 July 2026. 1 page.", "Aldston_Partners_anti_money_laundering_questionnaire.pdf - Anti-money laundering questionnaire for Aldston Partners, dated 17 August 2026. 3 pages, complete. Signed by the company's compliance officer.", "Aldston_Partners_gym_membership_card.pdf - Gym membership card with a photo belonging to Aldston Partners's authorised representative, showing an expiry date of 18 January 2029. 1 page.", "Aldston_Partners_bank_account_verification_letter.pdf - Bank account verification letter for Aldston Partners, dated 11 July 2026. 1 page. Signed by a bank officer.", "Aldston_Partners_product_catalogue_declaration.pdf - Product catalogue declaration for Aldston Partners, dated 4 August 2026. 4 pages, complete. Signed by the company's managing director.", "Aldston_Partners_returns_policy_statement.pdf - Returns policy statement for Aldston Partners, dated 17 June 2026. 2 pages, complete. Signed by an authorised signatory of Aldston Partners.", "Aldston_Partners_safety_compliance_certificate.pdf - Safety compliance certificate for Aldston Partners, dated 31 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 728}} {"id": "isc-te-00131-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Caelheim GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "14 May 2026"}, "checklist": ["Check that the pack contains a utilities connection certificate.", "Check that the pack contains a signed lease agreement.", "Check that the pack contains a floor load capacity report that is signed.", "Check that the pack contains a warehouse insurance policy that is still valid, not expired, on 14 May 2026.", "Check that the pack contains a fire safety certificate that is still valid, not expired, on 14 May 2026."], "submission": {"case": {"name": "warehouse PV-88477", "reference": "EJ-39928"}, "documents received": ["Warehouse insurance policy.pdf. This is the warehouse insurance policy for warehouse PV-88477, with an expiry date of 5 October 2027, 6 pages, complete.", "Floor load capacity report.pdf. This is the floor load capacity report for warehouse PV-88477, issued on 21 January 2026, 3 pages, complete. It is signed by the structural engineer.", "Lease agreement.pdf. This is the signed lease agreement for warehouse PV-88477, issued on 1 March 2026, 8 pages, complete. It is signed by the landlord.", "File 001.pdf. The file will not open, so its contents cannot be seen.", "Fire safety certificate.pdf. This is the fire safety certificate for warehouse PV-88477, with an expiry date of 25 August 2028, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 751}} {"id": "isc-te-00448-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Veystead Inc", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "24 July 2026"}, "checklist": ["Credit card in the driver's name (valid, i.e. not expired, on the date of the review, signed)", "Vehicle condition report (signed)", "Passport (valid, i.e. not expired, on the date of the review, signed)", "If the booking includes crossing a land border, also: cross-border travel permission (signed)", "Booking voucher (issued within the last 6 months)", "Insurance excess waiver certificate (valid, i.e. not expired, on the date of the review)", "Driving licence (valid, i.e. not expired, on the date of the review, signed)"], "submission": {"case": {"name": "Amelia Tadridge", "reference": "LS-38914", "details": ["The booking includes crossing a land border."]}, "documents received": ["Booking voucher, Amelia Tadridge. Date of issue: 25 May 2026. Single page.", "Vehicle condition report, Amelia Tadridge. Date of issue: 29 April 2026. 2 pages, complete. Signed by the branch counter staff member.", "Driving licence, Amelia Tadridge. Expiry date: 9 December 2026. 2 pages, complete. Signed by the licence holder.", "Cross-border travel permission, Amelia Tadridge. Date of issue: 28 June 2026. Single page. Signed by the branch counter staff member.", "Insurance excess waiver certificate, Amelia Tadridge. Expiry date: 3 June 2027. 2 pages, complete.", "Fuel policy sheet, Amelia Tadridge. Date of issue: 12 June 2026. Single page. Signed by the branch counter staff member.", "Credit card in the driver's name, Amelia Tadridge. Expiry date: 25 February 2028. Single page. Signed by the cardholder.", "Passport, Amelia Tadridge. Expiry date: 17 February 2028. Single page. Signed by the passport holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "partial", "defect": "signed", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 851}} {"id": "isc-te-00041-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Creskheim & Co", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "23 April 2026"}, "checklist": ["Company registration certificate.", "Trade references letter, issued within the last 3 months, signed.", "Credit reference agency report, issued within the last 3 months.", "If the customer is a newly incorporated company, also: director identification record, signed.", "Bank reference letter, issued within the last 6 months, signed.", "Signed credit terms agreement, signed.", "Credit limit approval memo, issued within the last 1 months, signed.", "If the customer requests a credit limit above the standard cap, also: finance director sanction letter, issued within the last 1 months, signed."], "submission": {"case": {"name": "Ivrfeld & Co", "reference": "QG-16044", "details": ["The customer is a newly incorporated company.", "The customer requests a credit limit above the standard cap."]}, "documents received": ["Company registration certificate for Ivrfeld & Co. Date of issue: 23 March 2026. 2 pages, complete.", "Credit limit approval memo for Ivrfeld & Co. Date of issue: 14 April 2026. Single page. Signed by the credit manager.", "Signed credit terms agreement for Ivrfeld & Co. Date of issue: 1 January 2026. 4 pages, complete. Signed by the customer.", "Personal guarantee for Ivrfeld & Co. Date of issue: 28 March 2026. 2 pages, complete. Signed by the guarantor.", "Bank reference letter for Ivrfeld & Co. Date of issue: 2 April 2026. Single page. Signed by the bank manager.", "Bank statement showing the applicant's balance for Ivrfeld & Co. Date of issue: 2 April 2026. Single page. Signed by the bank manager.", "Director identification record for Ivrfeld & Co. Date of issue: 5 January 2026. 2 pages, complete. Signed by a director.", "Credit reference agency report for Ivrfeld & Co. Date of issue: 17 April 2026. 6 pages, complete.", "Trade references letter for Ivrfeld & Co. Date of issue: 3 April 2026. Single page. Signed by the referee.", "Trade account application form for Ivrfeld & Co. Date of issue: 28 February 2026. 3 pages, complete. Signed by the applicant.", "Finance director sanction letter for Ivrfeld & Co. Date of issue: 5 April 2026. Single page. Signed by the finance director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 8, "n_conditional": 2, "n_documents": 11, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 977}} {"id": "isc-te-00097-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Quorwater LLP", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "8 April 2026"}, "checklist": ["Bank statement for the period, issued within the last 2 months.", "Bank charges and interest explanation sheet, signed.", "Direct debit mandate report from the bank, issued within the last 3 months.", "Outstanding receipts list.", "Bank reconciliation statement, signed."], "submission": {"case": {"name": "company bank account YA-14391", "reference": "OU-26776"}, "documents received": ["Outstanding receipts list for company bank account YA-14391. Date of issue: 12 December 2025. Single page.", "Bank reconciliation statement for company bank account YA-14391. Date of issue: 29 March 2026. 2 pages, complete. Signed by the financial controller.", "Bank statement for the period covering company bank account YA-14391. Date of issue: 25 March 2026. 4 pages, complete.", "Direct debit mandate report from the bank for company bank account YA-14391. Date of issue: 10 December 2025. 2 pages, complete.", "Bank charges and interest explanation sheet for company bank account YA-14391. Date of issue: 7 February 2026. Single page. Signed by the accountant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 702}} {"id": "isc-te-00314-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Marlgard GmbH", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "1 June 2026"}, "checklist": ["If the transfer is an international movement, also: transit customs document (signed)", "load consolidation sheet (issued within the last 3 months, signed)", "seal number log (issued within the last 1 months, signed)", "damaged goods exception sheet (issued within the last 1 months, signed)", "transfer manifest (signed)"], "submission": {"case": {"name": "cross-dock transfer CD-54159", "reference": "GL-47907", "details": ["The transfer is an international movement."]}, "documents received": ["transfer_manifest_CD-54159.pdf. Transfer manifest for cross-dock transfer CD-54159, dated 13 March 2026. 3 pages, complete. Signed by the transport planner.", "transit_customs_document_CD-54159.pdf. Transit customs document for cross-dock transfer CD-54159, dated 25 April 2026. 4 pages, complete. Signed by the customs agent.", "damaged_goods_exception_sheet_CD-54159.pdf. Damaged goods exception sheet for cross-dock transfer CD-54159, dated 28 May 2026. 1 page. Signed by the warehouse shift supervisor.", "file_GL-47907_08.pdf. The file will not open, so its contents cannot be seen.", "seal_number_log_CD-54159.pdf. Seal number log for cross-dock transfer CD-54159, dated 17 May 2026. 1 page. Signed by the depot security officer.", "inbound_unloading_record_CD-54159.pdf. Inbound unloading record for cross-dock transfer CD-54159, dated 19 May 2026. 1 page. Signed by the inbound unloading team lead.", "load_consolidation_sheet_CD-54159.pdf. Load consolidation sheet for cross-dock transfer CD-54159, dated 25 April 2026. 2 pages, complete. Signed by the load consolidation planner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "conditional", "defect": "document present (circumstance holds), plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 887}} {"id": "isc-te-00079-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Fervridge Partners", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "2 March 2026"}, "checklist": ["Payment gateway technical specification: all pages included.", "Fraud screening configuration sheet: signed.", "Gateway integration request form: signed.", "Data protection impact assessment: issued within the last 12 months, signed.", "Go-live sign-off certificate: issued within the last 1 months, signed.", "Merchant account agreement: signed.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review."], "submission": {"case": {"name": "payment gateway XI-37260", "reference": "SY-57899", "details": ["The gateway will store customers' card details."]}, "documents received": ["Payment gateway technical specification for payment gateway XI-37260. Date of issue: 5 January 2026. 8 pages, complete.", "Data protection impact assessment for payment gateway XI-37260. Date of issue: 26 August 2025. 5 pages, complete, signed by the data protection officer.", "Go-live sign-off certificate for payment gateway XI-37260. Date of issue: 21 February 2026. Single page, signed by the payments operations manager.", "Fraud screening configuration sheet for payment gateway XI-37260. Date of issue: 14 November 2025. Single page, signed by the fraud screening administrator.", "Merchant account agreement for payment gateway XI-37260. Date of issue: 2 February 2026. 6 pages, complete, signed by the merchant account holder.", "Penetration test summary for payment gateway XI-37260. Date of issue: 15 December 2025. 3 pages, complete, signed by the penetration test lead.", "Gateway integration request form for payment gateway XI-37260. Date of issue: 18 January 2026. 2 pages, complete, signed by the requesting merchant manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 856}} {"id": "isc-te-00457-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Kenvdale BV", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "16 June 2026"}, "checklist": ["If the requested advance is above the standard advance limit, also: finance director approval for the higher advance (signed)", "Travel advance request form (signed)", "Travel policy extract showing advance eligibility", "Costed trip estimate sheet (issued within the last 3 months, signed)", "Line manager approval for the advance (signed)", "Trip itinerary and approval (issued within the last 3 months, signed)", "Payroll deduction agreement for recovery of the advance (signed)"], "submission": {"case": {"name": "Orla Natfield", "reference": "LZ-40963", "details": ["The requested advance is above the standard advance limit."]}, "documents received": ["Travel policy extract - Orla Natfield - 28 February 2026.pdf. A travel policy extract showing advance eligibility relating to Orla Natfield, dated 28 February 2026. It is 1 page.", "Costed trip estimate sheet - Orla Natfield - 22 May 2026.pdf. A costed trip estimate sheet relating to Orla Natfield, dated 22 May 2026. It is 1 page and signed by the employee.", "Trip itinerary and approval - Orla Natfield - 1 March 2026.pdf. A trip itinerary and approval relating to Orla Natfield, dated 1 March 2026. It is 2 pages, complete, and signed by the line manager.", "FD approval higher advance - Orla Natfield - 4 March 2026.pdf. A finance director approval for the higher advance relating to Orla Natfield, dated 4 March 2026. It is 1 page and carries the signature of the finance director.", "Travel advance request form - Orla Natfield - 2 May 2026.pdf. A travel advance request form relating to Orla Natfield, dated 2 May 2026. It is 1 page and signed by the employee.", "Line manager approval - Orla Natfield - 25 February 2026.pdf. A line manager approval for the advance relating to Orla Natfield, dated 25 February 2026. It is 1 page and signed by the line manager.", "Payroll deduction agreement - Orla Natfield - 31 May 2026.pdf. A payroll deduction agreement for recovery of the advance relating to Orla Natfield, dated 31 May 2026. It is 1 page and signed by the employee."]}}, "question": {"type": "choice", "instructions": "Determine whether the pack is complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Mark the pack complete if every applicable line is met (extra documents do not matter). Mark the pack incomplete if at least one applicable line is not met. Mark the pack unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-28", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 988}} {"id": "isc-te-00400-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravby plc", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "12 March 2026"}, "checklist": ["Inbound unloading record, issued within the last 1 months and signed.", "Damaged goods exception sheet, issued within the last 1 months and signed.", "Load consolidation sheet, issued within the last 3 months and signed.", "Outbound loading record, issued within the last 1 months and signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet, issued within the last 1 months and signed.", "Transfer manifest, signed.", "Cross-dock slot booking sheet, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer CF-57678", "reference": "AQ-93363", "details": ["The transfer includes a temperature-controlled load."]}, "documents received": ["Cross-dock-chiller-unit-check-sheet-CF-57678.pdf. A cross-dock chiller unit check sheet for cross-dock transfer CF-57678, dated 6 March 2026. Single page, signed by the refrigeration technician.", "Outbound-loading-record-CF-57678.pdf. An outbound loading record for cross-dock transfer CF-57678, dated 4 March 2026. Single page, signed by the loading bay operator.", "Load-consolidation-sheet-CF-57678.pdf. A load consolidation sheet for cross-dock transfer CF-57678, dated 19 January 2026. 2 pages, complete, signed by the load planner.", "Damaged-goods-exception-sheet-CF-57678.pdf. A damaged goods exception sheet for cross-dock transfer CF-57678, dated 9 March 2026. Single page, signed by the shift supervisor.", "Transfer-manifest-CF-57678.pdf. A transfer manifest for cross-dock transfer CF-57678, dated 21 November 2025. 3 pages, complete, signed by the transport planner.", "Cross-dock-slot-booking-sheet-CF-57678.pdf. A cross-dock slot booking sheet for cross-dock transfer CF-57678, dated 7 March 2026. Single page, signed by the cross-dock coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 924}} {"id": "isc-te-00170-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Ebrshaw Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "13 April 2026"}, "checklist": ["Proposed architecture diagram", "Migration and rollout plan", "Review board feedback summary (issued within the last 3 months, signed)", "Problem statement page", "Cost estimate sheet (issued within the last 6 months)", "If the design introduces a new third-party dependency, also: third-party dependency risk assessment (issued within the last 6 months, signed)", "If the design changes how customer data is stored, also: data protection review sign-off (signed)"], "submission": {"case": {"name": "design document UC-75490", "reference": "AO-68653", "details": ["The design introduces no new third-party dependency.", "The design does not change how customer data is stored."]}, "documents received": ["Migration and rollout plan for design document UC-75490, dated 22 March 2026. 3 pages, complete.", "Problem statement page for design document UC-75490, dated 19 March 2026. 2 pages, complete.", "Proposed architecture diagram for design document UC-75490, dated 21 December 2025. Single page.", "Cost estimate sheet for design document UC-75490, dated 20 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 702}} {"id": "isc-te-00478-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Aldlund GmbH", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "9 September 2026"}, "checklist": ["Impact assessment on the team, signed", "Line manager opinion note, issued within the last 2 months, signed", "Previous flexible working requests record, issued within the last 24 months", "Flexible working request form, signed"], "submission": {"case": {"name": "Adaeze Tibescu", "reference": "CU-27722"}, "documents received": ["impact_assessment_team_adaeze_tibescu.pdf - Impact assessment on the team regarding Adaeze Tibescu, dated 23 May 2026. 3 pages, complete. Signed by the line manager.", "previous_flexible_working_requests_record_adaeze_tibescu.pdf - Previous flexible working requests record regarding Adaeze Tibescu, dated 12 October 2024. 1 page.", "flexible_working_request_form_adaeze_tibescu_unsigned.pdf - Flexible working request form regarding Adaeze Tibescu, dated 30 June 2026. 3 pages, complete. The signature line is empty; the form is not signed.", "line_manager_opinion_note_adaeze_tibescu.pdf - Line manager opinion note regarding Adaeze Tibescu, dated 3 August 2026. 2 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 688}} {"id": "isc-te-00384-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Jundburg Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "8 June 2026"}, "checklist": ["Confirm the pack contains the plant room access sign-in sheet.", "Confirm the pack contains the thermostat calibration certificate, issued within the last 12 months.", "Confirm the pack contains the engineer F-gas handling certificate, valid (not expired) on the date of the review.", "Confirm the pack contains the F-gas leak check record, issued within the last 12 months and signed.", "Confirm the pack contains the refrigerant top-up log, issued within the last 1 months and signed.", "Confirm the pack contains the system pressure test results, issued within the last 1 months and signed.", "If refrigerant was added during the service, also confirm the pack contains the refrigerant recovery note, issued within the last 1 months and signed."], "submission": {"case": {"name": "air conditioning system QA-33718", "reference": "FF-66011"}, "documents received": ["Engineer F-gas handling certificate for air conditioning system QA-33718, showing an expiry date of 1 November 2028. 1 page.", "Refrigerant top-up log for air conditioning system QA-33718, dated 31 May 2026. 1 page. Signed by the servicing engineer.", "Thermostat calibration certificate for air conditioning system QA-33718, dated 10 January 2026. 1 page.", "F-gas leak check record for air conditioning system QA-33718, dated 5 October 2025. 2 pages, complete. Signed by the servicing engineer.", "Plant room access sign-in sheet for air conditioning system QA-33718, dated 4 April 2026. 1 page.", "Asset condition photograph sheet for air conditioning system QA-33718, dated 18 May 2026. 2 pages, complete.", "System pressure test results for air conditioning system QA-33718, dated 26 May 2026. 2 pages, complete. Signed by the servicing engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 873}} {"id": "isc-te-00046-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Zaldhurst Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "1 June 2026"}, "checklist": ["Financial stability statement, issued within the last 12 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed.", "Supplier self-assessment report, issued within the last 12 months and signed.", "Certified quality management system certificate, valid (not expired) on the date of the review.", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months and signed."], "submission": {"case": {"name": "Eskvale plc", "reference": "VY-19567", "details": ["The supplier subcontracts part of the production."]}, "documents received": ["Eskvale_plc_financial_stability_statement_23March2026.pdf — Financial stability statement for Eskvale plc, dated 23 March 2026. 2 pages, complete. Signed by the finance director of Eskvale plc.", "Eskvale_plc_supplier_capacity_declaration_20June2025.pdf — Supplier capacity declaration for Eskvale plc, dated 20 June 2025. 2 pages, complete. Signed by the operations director of Eskvale plc.", "Eskvale_plc_supplier_quality_questionnaire_13April2026.pdf — Supplier quality questionnaire for Eskvale plc, dated 13 April 2026. 4 pages, complete. Signed by the quality manager of Eskvale plc.", "Eskvale_plc_subcontractor_approval_record_7October2025.pdf — Subcontractor approval record for Eskvale plc, dated 7 October 2025. 2 pages, complete. Signed by the purchasing manager of Eskvale plc.", "Eskvale_plc_certified_QMS_certificate_29October2027.pdf — Certified quality management system certificate for Eskvale plc, showing an expiry date of 29 October 2027. Single page.", "Eskvale_plc_supplier_self_assessment_report_14May2026.pdf — Supplier self-assessment report for Eskvale plc, dated 14 May 2026. 6 pages, complete. Signed by the quality manager of Eskvale plc.", "Eskvale_plc_customer_reference_letter_14May2026.pdf — Customer reference letter from another buyer regarding Eskvale plc, dated 14 May 2026. 6 pages, complete. Signed by the purchasing manager of the buyer who issued the letter."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 951}} {"id": "isc-te-00160-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Vaskfell Group", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "17 July 2026"}, "checklist": ["Equipment purchase request form, signed", "Three quotes comparison sheet, issued within the last 3 months, signed", "Grant fund eligibility note, issued within the last 6 months, signed", "Training needs assessment, signed", "Vendor quotation, issued within the last 3 months", "If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review"], "submission": {"case": {"name": "equipment YS-3896", "reference": "VL-69788", "details": ["The equipment uses radioactive sources."]}, "documents received": ["Training needs assessment YS-3896.pdf — Training needs assessment for equipment YS-3896, dated 24 April 2026, one page. Signed by the training coordinator.", "Vendor quotation YS-3896.pdf — Vendor quotation for equipment YS-3896, dated 27 May 2026. 2 pages, complete.", "Installation requirements note YS-3896.pdf — Installation requirements note for equipment YS-3896, dated 28 May 2026. 2 pages, complete.", "Radiation licence YS-3896.pdf — Radiation licence for equipment YS-3896, expiring 21 March 2028, one page.", "Grant fund eligibility note YS-3896.pdf — Grant fund eligibility note for equipment YS-3896, dated 21 March 2026, one page. Signed by the grants officer.", "Equipment purchase request form YS-3896.pdf — Equipment purchase request form for equipment YS-3896, dated 30 April 2026. 2 pages, complete. Signed by the requesting department head."]}}, "question": {"type": "choice", "instructions": "The task is to decide whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete if every applicable line is met (extra documents do not matter). Answer incomplete if at least one applicable line is not met. Answer unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-70", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 823}} {"id": "isc-te-00213-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Bravhaven Partners", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "6 July 2026"}, "checklist": ["Council flood warning notice, issued within the last 12 months", "Loss adjuster's inspection report, issued within the last 6 months and signed", "Debris removal invoice, issued within the last 6 months", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "Buildings insurance policy schedule"], "submission": {"case": {"name": "property OD-78962", "reference": "ZY-65584"}, "documents received": ["council_flood_warning_notice_OD-78962.pdf - Council flood warning notice about property OD-78962. Dated 3 April 2026. 1 page.", "photographs_of_flood_water_in_the_rooms_OD-78962.pdf - Photographs of flood water in the rooms about property OD-78962. Dated 21 June 2026. 3 pages, complete.", "loss_adjusters_inspection_report_OD-78962_v3.pdf - Loss adjuster's inspection report about property OD-78962. Dated 4 April 2026. 6 pages, complete. Signed by the loss adjuster.", "utility_suppliers_letter_OD-78962.pdf - Utility supplier's letter confirming the supply was cut off about property OD-78962. Dated 9 September 2025. 1 page.", "debris_removal_invoice_OD-78962.pdf - Debris removal invoice about property OD-78962. Dated 19 January 2026. 1 page.", "flood_claim_form_OD-78962.pdf - Flood claim form about property OD-78962. Dated 9 April 2026. 5 pages, complete. Signed by the policyholder.", "buildings_insurance_policy_schedule_OD-78962.pdf - Buildings insurance policy schedule about property OD-78962. Dated 10 March 2026. 5 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 879}} {"id": "isc-te-00322-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Larvmoor Inc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "2 April 2026"}, "checklist": ["Confirm the pack includes the account closure procedure.", "Confirm the pack includes a two-factor authentication confirmation issued within the last 3 months.", "Confirm the pack includes a signed platform terms acceptance record.", "Confirm the pack includes a signed account request form.", "Confirm the pack includes a signed naming convention approval."], "submission": {"case": {"name": "new social media account FX-38776", "reference": "AG-45011"}, "cover note": "I am not sure everything needed is in this pack, so please take a careful look before we go any further.", "documents received": ["two_factor_authentication_confirmation_FX-38776_v5.pdf. Two-factor authentication confirmation for new social media account FX-38776. It is dated 9 January 2026 and is a single page.", "account_request_form_FX-38776.pdf. Account request form for new social media account FX-38776. It is dated 21 March 2026, is a single page and is signed by the requesting marketing manager.", "naming_convention_approval_FX-38776.pdf. Naming convention approval for new social media account FX-38776. It is dated 1 January 2026, is a single page and is signed by the social media governance lead.", "platform_terms_acceptance_record_FX-38776.pdf. Platform terms acceptance record for new social media account FX-38776. It is dated 17 January 2026, is a single page and is signed by the social media manager.", "account_closure_procedure_FX-38776.pdf. Account closure procedure for new social media account FX-38776. It is dated 21 December 2025 and is a single page.", "two_factor_authentication_confirmation_FX-38776_v6.pdf. Two-factor authentication confirmation for new social media account FX-38776. It is dated 21 October 2024 and is a single page."]}}, "question": {"type": "choice", "instructions": "Does the pack fully satisfy the checklist? Check every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not trust cover notes and labels blindly, as they may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-73", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 879}} {"id": "isc-te-00368-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Zervwood & Co", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "1 September 2026"}, "checklist": ["Confirm that the bank charges and interest explanation sheet is included and signed.", "Confirm that the reviewer sign-off sheet for the reconciliation is included and signed.", "Confirm that the general ledger cash account listing is included.", "Confirm that the outstanding payments list is included.", "If the reconciliation shows an unexplained difference that is not an outstanding item, also confirm that the unexplained difference investigation note is included and signed.", "Confirm that the outstanding receipts list is included."], "submission": {"case": {"name": "company bank account PV-89003", "reference": "FU-96762", "details": ["The reconciliation shows an unexplained difference that is not an outstanding item."]}, "documents received": ["Reviewer sign-off sheet for the reconciliation - PV-89003. The sheet is dated 16 August 2026 and is 1 page. It is signed by the financial controller.", "Outstanding payments list - PV-89003. The list is dated 30 June 2026 and is 1 page.", "Unexplained difference investigation note - PV-89003. The note is dated 9 August 2026, 2 pages, complete. It is signed by the financial controller.", "Bank charges and interest explanation sheet - PV-89003. The sheet is dated 2 August 2026 and is 1 page. It is signed by the financial controller.", "General ledger cash account listing - PV-89003. The listing is dated 17 May 2026. Only 2 of its 3 pages are included, pages 1-2 of 3.", "Outstanding receipts list - PV-89003. The list is dated 13 August 2026 and is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00295-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Gormlock BV", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "29 May 2026"}, "checklist": ["Completed annual leave request form, signed", "If the leave requested is longer than 2 weeks, also: extended absence cover plan, signed", "Return to work date confirmation", "Statutory holiday entitlement confirmation", "Manager approval email, issued within the last 2 months", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave, signed", "Team holiday planner extract"], "submission": {"case": {"name": "Alice Gillsall", "reference": "SV-90688", "details": ["The leave requested is longer than two weeks.", "The employee is requesting leave during a known busy period."]}, "documents received": ["Scanned return to work date confirmation for Alice Gillsall, dated 9 April 2026. Single page.", "Scanned completed annual leave request form for Alice Gillsall, dated 20 April 2026. Single page, signed by the employee.", "Scanned team holiday planner extract for Alice Gillsall, dated 13 February 2026. 2 pages, complete.", "Scanned statutory holiday entitlement confirmation for Alice Gillsall, dated 28 February 2026. Single page.", "Scanned extended absence cover plan for Alice Gillsall, dated 21 May 2026. 3 pages, complete, signed by the line manager.", "Scanned manager approval email for Alice Gillsall, dated 20 May 2026. Single page.", "Scanned business case for peak-period leave for Alice Gillsall, dated 25 February 2026. 2 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 778}} {"id": "isc-te-00361-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Zervcrest Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "11 August 2026"}, "checklist": ["Confirm the pack contains the proposed rule change specification, signed.", "Confirm the pack contains the risk assessment, issued within the last 3 months, signed.", "Confirm the pack contains the business justification memo, issued within the last 3 months, signed.", "Confirm the pack contains the firewall change request form, signed.", "If the change is planned during the year-end close period, also: confirm the pack contains the freeze period exception approval, signed.", "If the change opens a new inbound connection from the internet, also: confirm the pack contains the internet exposure review certificate, issued within the last 1 months, signed."], "submission": {"case": {"name": "firewall change WU-46525", "reference": "PN-13005", "details": ["The change is planned for a normal working week.", "The change only affects internal connections between servers."]}, "cover note": "Please accept my apologies for the state of this pack, which was put together in a rush. I wanted to get it over to you today so the review can go ahead.", "documents received": ["Firewall change request form, firewall change WU-46525. Date of issue: 26 May 2026. 3 pages, complete. Signed by the requesting network engineer.", "Post-change test plan, firewall change WU-46525. Date of issue: 26 July 2026. 2 pages, complete. Signed by the testing coordinator.", "Risk assessment, firewall change WU-46525. Date of issue: 14 July 2026. 2 pages, complete. Signed by the information security risk analyst.", "File scan_0047.pdf. The scan comes out blank and its contents cannot be seen.", "Current rule set export, firewall change WU-46525. Date of issue: 9 August 2026. 8 pages, complete.", "Project charter for an unrelated initiative, filed with the pack for firewall change WU-46525. Date of issue: 17 July 2026. Single page. Signed by the project sponsor.", "Proposed rule change specification, firewall change WU-46525. Date of issue: 4 May 2026. 2 pages, complete. Signed by the network security architect.", "Business justification memo, firewall change WU-46525. Date of issue: 17 July 2026. Single page. Signed by the requesting business line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 6, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 969}} {"id": "isc-te-00438-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Halvmont GmbH", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "15 April 2026"}, "checklist": ["If the gateway will handle recurring subscription payments, also: subscription billing mandate template (signed)", "go-live sign-off certificate (issued within the last 1 months, signed)", "If the gateway will store customers' card details, also: card storage compliance certificate (valid (not expired) on the date of the review)", "merchant account agreement (signed)", "data protection impact assessment (issued within the last 12 months, signed)", "fraud screening configuration sheet (signed)"], "submission": {"case": {"name": "payment gateway QZ-24811", "reference": "HL-76895", "details": ["The gateway will not handle recurring subscription payments.", "The gateway will not store customers' card details."]}, "documents received": ["Fraud screening configuration sheet for payment gateway QZ-24811, dated 20 February 2026. Single page, signed by the fraud screening analyst.", "Data protection impact assessment for payment gateway QZ-24811, dated 8 September 2025. 5 pages, complete, signed by the data protection officer.", "Merchant account agreement for payment gateway QZ-24811, dated 31 December 2025. 6 pages, complete, signed by the merchant account manager.", "Go-live sign-off certificate for payment gateway QZ-24811, dated 28 March 2026. Single page, signed by the IT security lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 2, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 741}} {"id": "isc-te-00432-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Wynmark GmbH", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "14 September 2026"}, "checklist": ["Radiation safety training certificate, issued within the last 24 months and signed.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed.", "Photo identity document, valid (not expired) on the date of the review.", "Experiment safety clearance form, signed.", "Beam time or instrument booking confirmation."], "submission": {"case": {"name": "Noor Sabock", "reference": "VH-82380", "details": ["The researcher will work only during standard opening hours."]}, "documents received": ["Photo identity document for Noor Sabock showing an expiry date of 25 September 2025, 1 page.", "Radiation safety training certificate for Noor Sabock, dated 6 April 2025, 1 page. It is signed by the radiation safety officer.", "Home institution endorsement letter for Noor Sabock, dated 10 September 2026, 1 page. It is signed by the head of Noor Sabock's home institution department.", "Experiment safety clearance form for Noor Sabock, dated 18 June 2026, 3 pages, complete. It is signed by the experiment safety coordinator.", "Beam time or instrument booking confirmation for Noor Sabock, dated 8 August 2026, 1 page."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide. Review each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Give complete if every applicable line is met (extra documents do not matter). Give incomplete if at least one applicable line is not met. Give unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "expired before the review", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-25", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 721}} {"id": "isc-te-00059-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Wynholm Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "15 April 2026"}, "checklist": ["Three months of bank statements, issued within the last 3 months.", "If the property being bought is a flat in a shared building, also: management company pack, issued within the last 3 months.", "Three most recent payslips, issued within the last 3 months.", "Gifted deposit letter, issued within the last 3 months, signed.", "Property valuation report, issued within the last 3 months, signed.", "Passport, valid (not expired) on the date of the review.", "Mortgage application form, issued within the last 3 months, signed."], "submission": {"case": {"name": "Burak Stanani", "reference": "ES-59536", "details": ["The property being bought is a flat in a shared building."]}, "documents received": ["Passport for Burak Stanani, showing an expiry date of 12 June 2026. 2 pages, complete.", "Three most recent payslips for Burak Stanani, dated 25 February 2026. 3 pages, complete.", "Property valuation report for Burak Stanani, dated 7 February 2026. 8 pages, complete, signed by the surveyor.", "Proof of deposit savings for Burak Stanani, dated 4 March 2026. 2 pages, complete.", "Mortgage application form for Burak Stanani, dated 11 April 2026. 10 pages, complete, signed by the borrower.", "Three months of bank statements for Burak Stanani, dated 8 March 2026. 9 pages, complete.", "P60 tax summary for Burak Stanani, dated 29 March 2026. 2 pages, complete.", "Gifted deposit letter for Burak Stanani, dated 27 January 2026. Single page, signed by the gift donor."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack fulfils the checklist. Examine every checklist line that applies to this case. For a required document to count, it must be the kind listed (not a similar kind), be about the case's subject, have all its pages, be signed wherever the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line fails. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-11", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00424-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ambside & Co", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "15 May 2026"}, "checklist": ["visa entry requirement printout, issued within the last 3 months", "flight itinerary quote, issued within the last 1 months", "line manager approval, signed", "If the trip involves travel to a country requiring a visa, also: visa approval letter", "trip cost estimate, signed", "passport copy for international travel, valid (not expired) on the date of the review"], "submission": {"case": {"name": "business trip QQ-26801", "reference": "UK-40834", "details": ["The trip involves travel to a country requiring a visa."]}, "documents received": ["trip_cost_estimate_QQ-26801.pdf. This is a trip cost estimate for business trip QQ-26801, showing a date of issue of 6 April 2026. It is a single page, signed by the travel coordinator.", "line_manager_approval_QQ-26801.pdf. This is a line manager approval for business trip QQ-26801, showing a date of issue of 29 January 2026. It is a single page, signed by the line manager.", "visa_entry_requirement_printout_QQ-26801.pdf. This is a visa entry requirement printout for business trip QQ-26801, showing a date of issue of 3 April 2026. 2 pages, complete.", "passport_copy_QQ-26801.pdf. This is a passport copy for international travel for business trip QQ-26801, showing an expiry date of 19 September 2027. It is a single page.", "flight_itinerary_quote_QQ-26801.pdf. This is a flight itinerary quote for business trip QQ-26801, showing a date of issue of 1 May 2026. 2 pages, complete.", "visa_approval_letter_QQ-26801.pdf. This is a visa approval letter for business trip QQ-26801, showing a date of issue of 26 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 882}} {"id": "isc-te-00019-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Xanvale LLP", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "26 March 2026"}, "checklist": ["If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "prerequisite certificate", "employer sponsorship letter (issued within the last 3 months, signed)", "cancellation policy acceptance (signed)", "payment confirmation (issued within the last 3 months)", "venue access instructions (issued within the last 3 months)", "course booking form (signed)"], "submission": {"case": {"name": "course booking HG-96006", "reference": "MZ-70767", "details": ["The course does not lead to a licensed qualification."]}, "documents received": ["Prerequisite certificate for course booking HG-96006, dated 12 February 2026. Single page.", "Payment confirmation for course booking HG-96006, dated 11 January 2026. Single page.", "Employer sponsorship letter for course booking HG-96006, dated 23 February 2026. Single page, signed by the employer's authorised signatory.", "Course booking form for course booking HG-96006, dated 10 January 2026. 2 pages, complete. Signed by the course booking delegate.", "File named scan_doc_001.pdf. The file will not open, so its contents cannot be seen.", "Cancellation policy acceptance for course booking HG-96006, dated 24 December 2025. Single page, signed by the course booking delegate.", "Venue access instructions for course booking HG-96006, dated 17 January 2026. Single page."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 582}} {"id": "isc-te-00092-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Aldness Partners", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "25 May 2026"}, "checklist": ["Leaver notification form, signed", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed", "Non-disclosure reminder acknowledgement, signed", "Service desk ticket closure summary, issued within the last 1 months", "Equipment return receipt, issued within the last 1 months, signed", "Final payroll cut-off note, issued within the last 1 months, signed", "Line manager confirmation, issued within the last 1 months, signed"], "submission": {"case": {"name": "Vikram Brodard", "reference": "VR-80988", "details": ["The leaver held no privileged administrator accounts."]}, "documents received": ["NDA_reminder_ack_Brodard_20260319.pdf. A non-disclosure reminder acknowledgement for Vikram Brodard, dated 19 March 2026. It is a single page and is signed by the departing employee.", "Service_desk_closure_summary_Brodard_20260517.pdf. A service desk ticket closure summary for Vikram Brodard, dated 17 May 2026. 3 pages, complete.", "Equipment_return_receipt_Brodard_20260522.pdf. An equipment return receipt for Vikram Brodard, dated 22 May 2026. It is a single page and is signed by the receiving IT asset officer.", "Line_manager_confirmation_Brodard_20250216.pdf. A line manager confirmation for Vikram Brodard, dated 16 February 2025. It is a single page and is signed by the line manager.", "Line_manager_confirmation_Brodard_20260606.pdf. A line manager confirmation for Vikram Brodard, dated 6 May 2026. 1 page, complete. It is signed by the line manager.", "Scan_20260525_0417.pdf. The scan is blank and nothing of its contents can be seen.", "Shared_mailbox_handover_Brodard_20260518.pdf. A shared mailbox handover record for Vikram covering Vikram Brodard, dated 18 May 2026. 2 pages, complete. It is signed by the line manager.", "Leaver_notification_form_Brodard_20260410.pdf. A leaver notification form for Vikram Brodard, dated 10 April 2026. 2 pages, complete. It is signed by the line manager.", "Payroll_cut_off_note_Brodard_20260523.pdf. A final payroll cut-off note for Vikram Brodard, dated 23 May 2026. It is a single page and is signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1050}} {"id": "isc-te-00010-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ilvwell & Co", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "17 June 2026"}, "checklist": ["Confirmation of contact details, issued within the last 3 months, is on file.", "Signed delivery address confirmation is on file.", "Signed signature verification record is on file.", "Signed fraud questionnaire is on file."], "submission": {"case": {"name": "Femke Gadstad", "reference": "XS-17516"}, "documents received": ["Fraud questionnaire - Femke Gadstad.pdf. Fraud questionnaire for Femke Gadstad, issued on 30 April 2026. It is 2 pages, complete, and signed by the cardholder.", "Lost card declaration - Femke Gadstad.pdf. Lost card declaration for Femke Gadstad, issued on 25 February 2026. It is 1 page and signed by the cardholder.", "Confirmation of contact details - Femke Gadstad.pdf. Confirmation of contact details for Femke Gadstad, issued on 20 April 2026. It is 1 page.", "Delivery address confirmation - Femke Gadstad.pdf. Delivery address confirmation for Femke Gadstad, issued on 1 June 2026. It is 1 page and signed by the cardholder.", "Signature verification record - Femke Gadstad.pdf. Signature verification record for Femke Gadstad, issued on 25 February 2026. It is 1 page and signed by the card services officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 713}} {"id": "isc-te-00034-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Kenvstow GmbH", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "2 March 2026"}, "checklist": ["Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "If the flood water reached the upper floor of the property, also: upper floor damage schedule, signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Council flood warning notice, issued within the last 12 months", "Loss adjuster's inspection report, issued within the last 6 months, signed", "Buildings insurance policy schedule", "Debris removal invoice, issued within the last 6 months"], "submission": {"case": {"name": "property EP-34443", "reference": "ES-19965", "details": ["The flood water reached the upper floor of the property."]}, "cover note": "Please could you approve this pack as quickly as possible, as all the paperwork is in order. Kind regards, Mert Nebbmore", "documents received": ["Utility supplier's letter confirming the supply was cut off about property EP-34443. Dated 25 March 2025. 1 page.", "Loss adjuster's inspection report about property EP-34443. Dated 14 February 2026. 6 pages, complete. Signed by the loss adjuster.", "Photographs of flood water in the rooms about property EP-34443. Dated 23 February 2026. 3 pages, complete.", "Buildings insurance policy schedule about property EP-34443. Dated 30 November 2025. 5 pages, complete.", "Council flood warning notice about property EP-34443. Dated 2 November 2025. 1 page.", "Debris removal invoice about property EP-34443. Dated 27 December 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "Your task is to decide whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-40", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 835}} {"id": "isc-te-00240-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jarlvik Group", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "8 September 2026"}, "checklist": ["If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Travel request form (signed)", "Trip cost estimate (signed)", "Passport copy for international travel (valid (not expired) on the date of the review)", "Hotel booking confirmation", "Line manager approval (signed)", "Visa entry requirement printout (issued within the last 3 months)"], "submission": {"case": {"name": "business trip TW-11432", "reference": "GJ-59230", "details": ["The traveller is not a passport holder of the destination country."]}, "cover note": "Please could you approve this pack quickly, as all the paperwork is in order. Kind regards, Lucia Nebbard", "documents received": ["Flight itinerary quote. It concerns business trip TW-11432. Date of issue: 26 August 2026. 2 pages, complete.", "Work permit confirmation. It concerns business trip TW-11432. Date of issue: 9 June 2026. 2 pages, complete.", "Travel request form. It concerns business trip TW-11432. Date of issue: 16 August 2026. 2 pages, complete. Signed by the traveller.", "Passport copy for international travel. It concerns business trip TW-11432. Expiry date: 21 January 2027. Single page.", "Trip cost estimate. It concerns business trip TW-11432. Date of issue: 5 August 2026. Single page. Signed by the traveller.", "Line manager approval. It concerns business trip TW-11432. Date of issue: 18 June 2026. Single page. Signed by the line manager.", "Visa entry requirement printout. It concerns business trip TW-11432. Date of issue: 10 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 850}} {"id": "isc-te-00144-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Merswood Inc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "29 May 2026"}, "checklist": ["If the account will be run by an external agency, also: agency access agreement (signed)", "admin access list (issued within the last 3 months)", "account purpose statement", "platform terms acceptance record (signed)", "two-factor authentication confirmation (issued within the last 3 months)", "content escalation route (signed)"], "submission": {"case": {"name": "new social media account FY-24531", "reference": "QP-40875", "details": ["The account will be run by an external agency."]}, "documents received": ["Content escalation route, new social media account FY-24531. Date of issue: 17 February 2026. It is a single page. It is signed by the Social Media Governance Lead.", "Two-factor authentication confirmation, new social media account FY-24531. Date of issue: 15 May 2026. It is a single page.", "Platform terms acceptance record, new social media account FY-24531. Date of issue: 20 February 2026. It is a single page. It is signed by the Social Media Governance Lead.", "Admin access list, new social media account FY-24531. Date of issue: 12 March 2026. It is a single page.", "Account purpose statement, new social media account FY-24531. Date of issue: 30 April 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 746}} {"id": "isc-te-00211-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Fervside LLP", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "14 April 2026"}, "checklist": ["Flood claim form, signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "If the flood water reached the upper floor of the property, also: upper floor damage schedule, signed", "Buildings insurance policy schedule", "Council flood warning notice, issued within the last 12 months", "Photographs of flood water in the rooms, issued within the last 1 months"], "submission": {"case": {"name": "property FN-55122", "reference": "BL-30475", "details": ["The flood water stayed at ground floor level."]}, "cover note": "Please review the pack for property FN-55122. I am not sure everything needed is there.", "documents received": ["Council flood warning notice for property FN-55122. Date of issue: 23 December 2025. 1 page.", "Flood claim form for property FN-55122. Date of issue: 22 March 2026. 5 pages, complete. Signed by the claimant.", "Utility bill from before the flood for property FN-55122. Date of issue: 30 September 2025. 1 page.", "Buildings insurance policy schedule for property FN-55122. Date of issue: 1 February 2026. 5 pages, complete.", "Debris removal invoice for property FN-55122. Date of issue: 2 November 2025. 1 page.", "Utility supplier's letter confirming the supply was cut off at property FN-55122. Date of issue: 30 September 2025. 1 page.", "Photographs of flood water in the rooms at property FN-55122. Date of issue: 2 April 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist by going through every checklist line that applies to this case. Only count a required document if it matches the kind of document listed (not a similar one), deals with the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-69", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00043-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Austmere LLP", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "2 September 2026"}, "checklist": ["Racking inspection report, issued within the last 12 months and signed.", "Signed lease agreement.", "Planning permission.", "Fire safety certificate, valid (not expired) on the date of the review.", "Asbestos survey."], "submission": {"case": {"name": "warehouse BB-20125", "reference": "KU-84726"}, "cover note": "I have put the pack together for this one, but I am not certain that everything needed is in there. Could you take a look and let me know if anything else is required?", "documents received": ["BB-20125_warehouse_insurance_policy_expires_2029-02-09.pdf. Warehouse insurance policy for warehouse BB-20125, with an expiry date of 9 February 2029, 6 pages, complete.", "BB-20125_asbestos_survey_2026-05-17.pdf. Asbestos survey for warehouse BB-20125, dated 17 May 2026, 5 pages, complete.", "BB-20125_planning_permission_2026-07-06.pdf. Planning permission for warehouse BB-20125, dated 6 July 2026, 2 pages, complete.", "BB-20125_lease_agreement_2026-06-13.pdf. Signed lease agreement for warehouse BB-20125, dated 13 June 2026, 8 pages, complete. It is signed by the landlord and the tenant.", "BB-20125_racking_inspection_report_2026-05-28.pdf. Racking inspection report for warehouse BB-20125, dated 28 May 2026, 2 pages, complete. It is signed by the inspecting engineer.", "BB-20125_fire_safety_certificate_expires_2026-10-18.pdf. Fire safety certificate for warehouse BB-20125, with an expiry date of 18 October 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 901}} {"id": "isc-te-00419-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Quelmere Inc", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "23 June 2026"}, "checklist": ["Passport, valid (not expired) on the date of the review: 23 June 2026.", "Three months of bank statements, issued within the last 3 months.", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months, signed.", "Mortgage application form, issued within the last 3 months, signed.", "Gifted deposit letter, issued within the last 3 months, signed."], "submission": {"case": {"name": "Freya Moskwick", "reference": "QS-74483", "details": ["The borrower is self-employed."]}, "documents received": ["mortgage_application_form_moskwick.pdf - Mortgage application form for Freya Moskwick. It shows a date of issue of 2 April 2026. 10 pages, complete. It is signed by the borrower, Freya Moskwick.", "p60_tax_summary_moskwick.pdf - P60 tax summary for Freya Moskwick. It shows a date of issue of 25 September 2025. 2 pages, complete.", "bank_statements_moskwick.pdf - Three months of bank statements for Freya Moskwick. They show a date of issue of 14 April 2026. 9 pages, complete.", "gifted_deposit_letter_moskwick.pdf - Gifted deposit letter for Freya Moskwick. It shows a date of issue of 17 May 2026. It is a single page. It is signed by the donor of the gift.", "passport_moskwick.pdf - Passport for Freya Moskwick. It shows an expiry date of 21 August 2027. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Work through every checklist line that applies to this case one by one. For a required document to count, it must be the exact kind of document listed (not a similar one), be about the subject of the case, contain all its pages, be signed where the checklist asks for a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line only applies when its circumstance holds for the case. complete: all applicable lines are met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-68", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00475-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Jaskside plc", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "5 March 2026"}, "checklist": ["If the employee has caring responsibilities for a dependent, also: caring responsibilities statement (signed).", "Trial period proposal (signed).", "Current working pattern statement (issued within the last 3 months).", "If the request is to work entirely from home, also: home working equipment checklist (signed).", "Line manager opinion note (issued within the last 2 months, signed).", "Impact assessment on the team (signed).", "Proposed working pattern plan (signed).", "Client or service impact statement (signed)."], "submission": {"case": {"name": "Beatriz Zellopoulos", "reference": "FK-25780", "details": ["The employee does not have caring responsibilities for a dependent.", "The request is not to work entirely from home."]}, "documents received": ["Impact assessment on the team regarding Beatriz Zellopoulos. Dated 7 February 2026. 3 pages, complete, signed by the line manager.", "Client or service impact statement for Beatriz Zellopoulos. Dated 15 December 2025. Single page, signed by the line manager.", "Proposed working pattern plan for Beatriz Zellopoulos. Dated 12 November 2025. 2 pages, complete, signed by Beatriz Zellopoulos.", "Trial period proposal for Beatriz Zellopoulos. Dated 10 December 2025. Single page, signed by Beatriz Zellopoulos.", "Line manager opinion note on Beatriz Zellopoulos. Dated 2 February 2026. 2 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-74", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 775}} {"id": "isc-te-00085-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Marlham GmbH", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "19 May 2026"}, "checklist": ["Driving licence: valid (not expired) on the date of the review, signed", "Additional driver authorisation form: signed", "Passport: valid (not expired) on the date of the review, signed", "Credit card in the driver's name: valid (not expired) on the date of the review, signed", "Vehicle condition report: signed"], "submission": {"case": {"name": "Eoin Thornden", "reference": "KU-86966"}, "documents received": ["passport_thornden.pdf. Passport for Eoin Thornden, expiring 24 August 2028. Single page. Signed by the issuing authority.", "driving_licence_thornden.pdf. Driving licence for Eoin Thornden, expiring 8 August 2027. 2 pages, complete. Signed by the licence holder.", "vehicle_condition_report_thornden.pdf. Vehicle condition report for Eoin Thornden, issued 6 May 2026. 2 pages, complete. Signed by the inspecting branch staff member.", "credit_card_thornden.pdf. Credit card in the driver's name for Eoin Thornden, expiring 18 November 2026. Single page. Signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 686}} {"id": "isc-te-00227-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Gravlock plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "24 June 2026"}, "checklist": ["supplier quality questionnaire, issued within the last 12 months, signed", "supplier capacity declaration, issued within the last 12 months, signed", "supplier audit report, issued within the last 24 months, signed", "supplier corrective action plan, issued within the last 6 months, signed", "financial stability statement, issued within the last 12 months, signed", "certified quality management system certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Mersheim BV", "reference": "TB-65922"}, "documents received": ["TB-65922_supplier_audit_report_Mersheim.pdf - Supplier audit report for Mersheim BV. Date of issue: 2 July 2025. 8 pages, complete. Signed by the lead auditor.", "TB-65922_supplier_capacity_declaration_Mersheim_v7.pdf - Supplier capacity declaration for Mersheim BV. Date of issue: 29 July 2024. 2 pages, complete. Signed by the supplier's operations manager.", "TB-65922_supplier_corrective_action_plan_Mersheim.pdf - Supplier corrective action plan for Mersheim BV. Date of issue: 11 March 2026. 3 pages, complete. Signed by the supplier's quality manager.", "TB-65922_financial_stability_statement_Mersheim.pdf - Financial stability statement for Mersheim BV. Date of issue: 11 April 2026. 2 pages, complete. Signed by the supplier's finance director.", "TB-65922_certified_qms_certificate_Mersheim.pdf - Certified quality management system certificate for Mersheim BV. Expiry date: 19 October 2028. Single page.", "TB-65922_supplier_self_assessment_report_Mersheim.pdf - Supplier self-assessment report for Mersheim BV. Date of issue: 31 May 2026. 6 pages, complete. Signed by the supplier's quality manager.", "TB-65922_supplier_quality_questionnaire_Mersheim.pdf - Supplier quality questionnaire for Mersheim BV. Date of issue: 19 November 2025. 4 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 922}} {"id": "isc-te-00107-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Maldmont plc", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "19 August 2026"}, "checklist": ["Product catalogue declaration, signed", "Returns policy statement, signed", "Anti-money laundering questionnaire, signed", "Authorised representative ID copy, valid (not expired) on the date of the review", "Bank account verification letter, issued within the last 3 months, signed", "Proof of trading address, issued within the last 3 months", "If the seller is a sole trader rather than a company, also: sole trader statutory declaration, signed"], "submission": {"case": {"name": "Silmont Ltd", "reference": "KC-98959", "details": ["The seller is a registered company."]}, "documents received": ["Silmont Ltd - tax registration letter.pdf. A tax registration letter for Silmont Ltd, dated 23 July 2026. It is a single page.", "Silmont Ltd - product catalogue declaration.pdf. A product catalogue declaration for Silmont Ltd, dated 28 May 2026. It runs to 4 pages, complete, and is signed by a director of Silmont Ltd.", "Silmont Ltd - proof of trading address 5.pdf. A proof of trading address for Silmont Ltd, dated 8 June 2026. It is a single page.", "Silmont Ltd - returns policy statement.pdf. A returns policy statement for Silmont Ltd, dated 11 August 2026. It runs to 2 pages, complete, and is signed by a director of Silmont Ltd.", "Silmont Ltd - authorised representative ID copy.pdf. A copy of the authorised representative's ID for Silmont Ltd, showing an expiry date of 7 October 2026. It is a single page.", "Silmont Ltd - bank account verification letter.pdf. A bank account verification letter for Silmont Ltd, dated 13 June 2026. It is a single page and is signed by a bank officer.", "Silmont Ltd - anti-money laundering questionnaire.pdf. An anti-money laundering questionnaire for Silmont Ltd, dated 22 July 2026. It runs to 3 pages, complete, and is signed by a director of Silmont Ltd."]}}, "question": {"type": "choice", "instructions": "Is the pack complete according to the checklist? Read through all checklist lines that apply to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. The answer complete means every applicable line is met (extra documents do not matter). The answer incomplete means at least one applicable line is not met. The answer unclear means no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; therefore judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-19", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 883}} {"id": "isc-te-00382-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Norvwater Group", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "14 May 2026"}, "checklist": ["Confirm the planned completion date sheet is included and signed.", "Confirm the location details sheet is included.", "Confirm the access authorisation slip is included and signed.", "Confirm the parts order confirmation is included and was issued within the last 1 months.", "Confirm the cost estimate is included, was issued within the last 3 months, and is signed."], "submission": {"case": {"name": "maintenance request AM-49331", "reference": "TF-32348"}, "documents received": ["AM-49331_location_details_sheet.pdf - Location details sheet for maintenance request AM-49331, dated 2 May 2026. Single page.", "AM-49331_cost_estimate_9November2025.pdf - Cost estimate for maintenance request AM-49331, dated 9 November 2025. 2 pages, complete. Signed by the estimating officer.", "AM-49331_photographs_of_the_fault.pdf - Photographs of the fault for maintenance request AM-49331, dated 10 May 2026. 2 pages, complete.", "AM-49331_parts_order_confirmation.pdf - Parts order confirmation for maintenance request AM-49331, dated 24 April 2026. Single page.", "AM-49331_job_request_form.pdf - Job request form for maintenance request AM-49331, dated 6 May 2026. Single page. Signed by the requesting manager.", "AM-49331_planned_completion_date_sheet.pdf - Planned completion date sheet for maintenance request AM-49331, dated 26 January 2026. Single page. Signed by the maintenance supervisor.", "AM-49331_access_authorisation_slip.pdf - Access authorisation slip for maintenance request AM-49331, dated 25 January 2026. Single page. Signed by the security manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 856}} {"id": "isc-te-00138-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Orrmark & Co", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "6 March 2026"}, "checklist": ["Audit agenda, signed", "Open corrective action list, issued within the last 1 months, signed", "Document control list, issued within the last 3 months, signed", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary, issued within the last 3 months, signed", "Audit scope statement, signed"], "submission": {"case": {"name": "customer audit visit WK-33681", "reference": "CB-79631", "details": ["The customer auditor does not request access to sub-tier supplier records."]}, "cover note": "I am sorry the pack was put together in a rush.", "documents received": ["Audit agenda for customer audit visit WK-33681. Date of issue: 23 November 2025. Single page, signed by the quality management office lead.", "Open corrective action list for customer audit visit WK-33681. Date of issue: 20 February 2026. 2 pages, complete. Signed by the quality management office lead.", "Audit scope statement for customer audit visit WK-33681. Date of issue: 21 November 2025. Single page, signed by the quality management office lead.", "Document control list for customer audit visit WK-33681. Date of issue: 24 February 2026. 4 pages, complete. Signed by the quality management office lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 738}} {"id": "isc-te-00421-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Briskcliff LLP", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "3 June 2026"}, "checklist": ["Travel policy acknowledgement, signed.", "Line manager approval, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter.", "Trip cost estimate, signed.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Travel request form, signed."], "submission": {"case": {"name": "business trip WR-16880", "reference": "LV-18491", "details": ["The trip involves no country requiring a visa."]}, "documents received": ["Line manager approval for business trip WR-16880, issued 16 March 2026. Single page. Signed by the line manager.", "Trip cost estimate for business trip WR-16880, issued 29 April 2026. Single page. Signed by the employee.", "Visa entry requirement printout for business trip WR-16880, issued 25 March 2026. 2 pages, complete.", "Hotel loyalty programme enrolment form for business trip WR-16880, issued 9 February 2026. 2 pages, complete. Signed by the employee.", "Travel policy acknowledgement for business trip WR-16880, issued 2 May 2026. Single page. Signed by the employee.", "Travel request form for business trip WR-16880, issued 9 February 2026. 2 pages, complete. Signed by the employee.", "Passport copy for international travel for business trip WR-16880. Expiry date 27 August 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 780}} {"id": "isc-te-00263-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Gravton GmbH", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "20 March 2026"}, "checklist": ["Remediation items list, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Alerting rules review note, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months, signed.", "Customer impact statement, issued within the last 3 months."], "submission": {"case": {"name": "production incident UI-22644", "reference": "SZ-62023"}, "documents received": ["Root cause analysis report for production incident UI-22644. Date of issue: 13 January 2026. 5 pages, complete. Signed by the root cause analysis author.", "Remediation items list for production incident UI-22644. Date of issue: 5 January 2026. 2 pages, complete. Signed by the reliability engineering lead.", "Postmortem meeting minutes for production incident UI-22644. Date of issue: 7 January 2026. 3 pages, complete. Signed by the incident postmortem chair.", "Customer impact statement for production incident UI-22644. Date of issue: 18 February 2026. 2 pages, complete.", "Incident timeline for production incident UI-22644. Date of issue: 1 March 2026. 3 pages, complete.", "Service level objective breach record for production incident UI-22644. Date of issue: 29 January 2026. Single page.", "Alerting rules review note for production incident UI-22644. Date of issue: 18 January 2026. 2 pages, complete.", "Follow-up owner assignment sheet for production incident UI-22644. Date of issue: 18 January 2026. Single page. A sticky note covers the signature block, so it is not known whether it is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 871}} {"id": "isc-te-00379-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Eskhall SAS", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "8 July 2026"}, "checklist": ["If the seller intends to list food or cosmetic products, also include: safety compliance certificate (issued within the last 12 months)", "Include: proof of trading address (issued within the last 3 months)", "Include: tax registration letter", "Include: bank account verification letter (issued within the last 3 months, signed)", "Include: anti-money laundering questionnaire (signed)", "Include: business registration certificate", "Include: authorised representative ID copy (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Hondhall plc", "reference": "TW-57851"}, "documents received": ["Business registration certificate – Hondhall plc. Date of issue: 28 April 2026. 1 page.", "Authorised representative ID copy – Hondhall plc. Expiry date: 18 December 2028. 1 page.", "Anti-money laundering questionnaire – Hondhall plc. Date of issue: 23 March 2026. 3 pages, complete. Signed by the company's compliance officer.", "Tax registration letter – Hondhall plc. Date of issue: 12 May 2026. 1 page.", "Bank account verification letter – Hondhall plc. Date of issue: 17 May 2026. 1 page. Signed by the bank's account manager.", "Product catalogue declaration – Hondhall plc. Date of issue: 5 May 2026. 4 pages, complete. Signed by the company's authorised representative.", "Proof of trading address – Hondhall plc. Date of issue: 30 May 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Review every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-71", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 778}} {"id": "isc-te-00378-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Raskgate GmbH", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "1 July 2026"}, "checklist": ["Check that the pack contains a fraud screening result sheet issued within the last 3 months.", "Check that the pack contains a terms of sale acceptance log issued within the last 12 months.", "If the customer claims the item was not as described, also check that the pack contains a product description screenshot archive issued within the last 6 months.", "Check that the pack contains a customer order history extract issued within the last 6 months.", "Check that the pack contains a transaction record printout issued within the last 3 months.", "Check that the pack contains a signature proof of delivery issued within the last 6 months and signed.", "Check that the pack contains a chargeback response form signed."], "submission": {"case": {"name": "disputed transaction VF-44059", "reference": "UL-78187", "details": ["The customer claims the item was not as described."]}, "documents received": ["Product description screenshot archive for disputed transaction VF-44059, dated 12 April 2026. 2 pages, complete.", "Signature proof of delivery for disputed transaction VF-44059, dated 24 February 2026. The single page is cropped so that the signature block is cut off, so it is not known whether it is signed.", "Terms of sale acceptance log for disputed transaction VF-44059, dated 11 August 2025. Scanned document, 1 page.", "Transaction record printout for disputed transaction VF-44059, dated 20 June 2026. Scanned document, 1 page.", "Fraud screening result sheet for disputed transaction VF-44059, dated 28 June 2026. Scanned document, 1 page.", "Chargeback response form for disputed transaction VF-44059, dated 15 June 2026, signed by the payments disputes team lead. 2 pages, complete.", "Customer order history extract for disputed transaction VF-44059, dated 25 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "partial", "defect": "signature not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 875}} {"id": "isc-te-00365-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Jarlthorpe plc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "2 March 2026"}, "checklist": ["Outstanding advance clearance check, signed.", "Employee bank detail confirmation, issued within the last 6 months and signed.", "Payroll deduction agreement for recovery of the advance, signed.", "Travel advance request form, signed."], "submission": {"case": {"name": "Noor Plumden", "reference": "BH-90150"}, "cover note": "Here is the pack for Noor Plumden, reference BH-90150. I am not sure everything needed is there, so please take a look.", "documents received": ["Travel advance request form for Noor Plumden. The document is dated 21 February 2025 and is a single page. It is signed by Noor Plumden.", "Employee bank detail confirmation for Noor Plumden. The document is dated 22 November 2025 and is a single page. It is signed by the payroll officer.", "Outstanding advance clearance check for Noor Plumden. The document is dated 1 February 2026 and is a single page. It is signed by the accounts payable supervisor.", "Payroll deduction agreement for recovery of the advance for Noor Plumden. The document is dated 24 November 2025 and is a single page. It is signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 694}} {"id": "isc-te-00197-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Yarvwood Group", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "2 September 2026"}, "checklist": ["Authorised representative ID copy, valid (not expired) on the date of the review.", "Anti-money laundering questionnaire, signed.", "Tax registration letter.", "Business registration certificate.", "Product catalogue declaration, signed.", "Returns policy statement, signed."], "submission": {"case": {"name": "Quorgate GmbH", "reference": "HF-92686"}, "documents received": ["Tax registration letter for Quorgate GmbH. It shows a date of issue of 2 August 2026. 1 page.", "Business registration certificate for Quorgate GmbH. It shows a date of issue of 2 July 2026. 1 page.", "Returns policy statement for Quorgate GmbH. It shows a date of issue of 27 August 2026. 2 pages, complete. It is signed by the authorised representative.", "Product catalogue declaration for Quorgate GmbH. It shows a date of issue of 20 August 2026. 4 pages, complete. It is signed by the authorised representative.", "Proof of trading address for Quorgate GmbH. It shows a date of issue of 2 August 2026. 1 page.", "Anti-money laundering questionnaire for Quorgate GmbH. It shows a date of issue of 6 June 2026. 3 pages, complete. It is signed by the authorised representative.", "Authorised representative ID copy for Quorgate GmbH. It shows an expiry date of 8 September 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Output complete if every applicable line is met (extra documents do not matter). Output incomplete if at least one applicable line is not met. Output unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so base your judgement on the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-31", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 756}} {"id": "isc-te-00266-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Wilmwyn Limited", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "30 April 2026"}, "checklist": ["Check that the pack contains a hotel invoice issued within the last 6 months.", "If the claim exceeds the limit that requires director sign-off, also check that the pack contains a director approval slip issued within the last 3 months and signed.", "Check that the pack contains a restaurant receipt issued within the last 6 months.", "Check that the pack contains a taxi fare receipt issued within the last 6 months.", "Check that the pack contains a currency conversion statement issued within the last 6 months."], "submission": {"case": {"name": "Xiu Knoxova", "reference": "HF-82888", "details": ["The claim is below the limit requiring director sign-off."]}, "documents received": ["Paper napkin with the total written on it for Xiu Knoxova. Date of issue: 29 December 2025. 1 page.", "Taxi fare receipt for Xiu Knoxova. Date of issue: 27 January 2026. 1 page.", "Currency conversion statement for Xiu Knoxova. Date of issue: 22 March 2026. 1 page.", "Hotel invoice for Xiu Knoxova. Date of issue: 14 November 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 684}} {"id": "isc-te-00373-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Selvmont & Co", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "24 April 2026"}, "checklist": ["Signature verification record, signed", "Card replacement request form, signed", "Photo identification, valid (not expired) on the date of the review", "Confirmation of contact details, issued within the last 3 months", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "If the card was stolen rather than lost, also: police report reference document, issued within the last 1 months, signed"], "submission": {"case": {"name": "Matthias Sabopoulos", "reference": "SX-64326", "details": ["The cardholder is at their home address.", "The card was stolen rather than lost."]}, "documents received": ["Police report reference document for Matthias Sabopoulos, dated 14 April 2026. Single page. It is signed by the reporting officer.", "Card replacement request form for Matthias Sabopoulos, dated 4 February 2026. 2 pages, complete. It is signed by the cardholder.", "Confirmation of contact details for Matthias Sabopoulos, dated 7 April 2026. Single page.", "Fraud questionnaire for Matthias Sabopoulos, dated 2 April 2026. 2 pages, complete. It is signed by the cardholder.", "Photo identification for Matthias Sabopoulos, showing an expiry date of 9 October 2028. Single page.", "Signature verification record for Matthias Sabopoulos, dated 1 February 2026. Single page. The signature line is empty, so it is not signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00319-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Oskford BV", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "17 September 2026"}, "checklist": ["Supplier self-assessment report, issued within the last 12 months and signed.", "Certified quality management system certificate, valid (not expired) on the date of the review.", "Financial stability statement, issued within the last 12 months and signed.", "Raw material certificate of analysis, issued within the last 6 months and signed.", "If the supplier provides parts that are safety-critical, also: process failure mode and effects analysis, signed.", "Supplier audit report, issued within the last 24 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed."], "submission": {"case": {"name": "Elstfeld SAS", "reference": "QD-20096"}, "documents received": ["Process failure mode and effects analysis for Elstfeld SAS. Date of issue: 21 August 2026. 9 pages, complete. Signed by the supplier's process engineer.", "Supplier self-assessment report for Elstfeld SAS. Date of issue: 14 May 2026. 6 pages, complete. Signed by the supplier's quality manager.", "Supplier audit report for Elstfeld SAS. Date of issue: 6 January 2025. 8 pages, complete. Signed by the lead auditor.", "File 09.pdf. The file will not open, so its contents cannot be seen.", "Supplier quality questionnaire for Elstfeld SAS. Date of issue: 29 January 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Certified quality management system certificate for Elstfeld SAS. Expiry date: 8 March 2028. Single page.", "Supplier corrective action plan for Elstfeld SAS. Date of issue: 20 July 2026. 3 pages, complete. Signed by the supplier's quality manager.", "Financial stability statement for Elstfeld SAS. Date of issue: 6 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Raw material certificate of analysis for Elstfeld SAS. Date of issue: 6 July 2026. 2 pages, complete. Signed by the supplier's laboratory manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Examine each checklist line that applies here. A required document counts only if it is the kind of document listed (not a similar one), relates to the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can mislead, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "conditional", "defect": "document present (circumstance not stated), plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "variant-46", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 900}} {"id": "isc-te-00185-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Merslock & Co", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "25 March 2026"}, "checklist": ["Fixed asset register extract for the asset", "Sales invoice or receipt for the sale proceeds, issued within the last 3 months", "If the asset is being sold rather than scrapped, also: proof of payment received from the buyer, issued within the last 3 months", "Asset disposal request form, signed", "Written offer or valuation for the asset, issued within the last 6 months", "If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer, issued within the last 3 months", "Depreciation schedule for the asset to date", "Asset de-registration and tag removal record, signed"], "submission": {"case": {"name": "disposed asset JI-91007", "reference": "ER-48676", "details": ["The asset is being sold rather than scrapped.", "The asset is not a company car being part-exchanged."]}, "documents received": ["Fixed_asset_register_extract_JI-91007.pdf: A fixed asset register extract for the asset relating to disposed asset JI-91007. It is dated 9 January 2026 and is a single page.", "Asset_de-registration_and_tag_removal_record_JI-91007.pdf: An asset de-registration and tag removal record relating to disposed asset JI-91007, dated 6 February 2026. It is a single page and is signed by the group financial controller.", "Depreciation_schedule_JI-91007.pdf: A depreciation schedule for the asset to date relating to disposed asset JI-91007, dated 17 March 2026. All 2 of its 2 pages are included, 2 pages, complete.", "Written_offer_or_valuation_JI-91007.pdf: A written offer or valuation for the asset relating to disposed asset JI-91007, dated 2 January 2026. All 2 of its 2 pages are included, 2 pages, complete.", "Asset_disposal_request_form_JI-91007.pdf: An asset disposal request form relating to disposed asset JI-91007, dated 6 December 2025. All 2 of its 2 pages are included, 2 pages, complete. It is signed by the group financial controller.", "Proof_of_payment_received_from_buyer_JI-91007.pdf: A proof of payment received from the buyer relating to disposed asset JI-91007. It is dated 2 March 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 989}} {"id": "isc-te-00294-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Ulmfield Inc", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "23 April 2026"}, "checklist": ["Check the location details sheet is present.", "Check the cost estimate is present, was issued within the last 3 months, and is signed.", "Check the job request form is present and is signed.", "Check the parts order confirmation is present and was issued within the last 1 months.", "If the job involves working at height above two metres, also check the permit to work at height is present, was issued within the last 1 months, and is signed.", "Check the access authorisation slip is present and is signed."], "submission": {"case": {"name": "maintenance request PZ-34030", "reference": "IX-99751", "details": ["The job involves working at height above two metres."]}, "cover note": "Could you approve this one as quickly as possible? All the paperwork is in order. Thanks, Carmen", "documents received": ["A single-page parts order confirmation for maintenance request PZ-34030, dated 10 April 2026.", "A single-page access authorisation slip for maintenance request PZ-34030, dated 12 January 2026. It is signed by the site security manager.", "A single-page location details sheet for maintenance request PZ-34030, dated 17 April 2026.", "A cost estimate for maintenance request PZ-34030, dated 14 April 2026. It has 2 pages, complete. It is signed by the estimating manager.", "A single-page job request form for maintenance request PZ-34030, dated 2 January 2026. It is signed by the requesting department manager."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and determine completeness. Check each checklist line that applies to this case. A required document counts only if it matches the listed document kind (not something similar), deals with the subject of the case, has all pages intact, is signed wherever the checklist calls for a signature, had not expired by the review date, and was issued within the timeframe the checklist permits. A conditional line is applicable only if its circumstance holds for the case. complete: all applicable lines are met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, yet at least one cannot be resolved from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead you; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-8", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 786}} {"id": "isc-te-00105-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Oskcliff BV", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "16 April 2026"}, "checklist": ["Fraud screening result sheet issued within the last 3 months.", "Signature proof of delivery issued within the last 6 months and signed.", "Delivery confirmation issued within the last 6 months.", "Transaction record printout issued within the last 3 months.", "Chargeback response form, signed.", "Customer account details page issued within the last 3 months."], "submission": {"case": {"name": "disputed transaction EQ-46342", "reference": "VR-66300"}, "documents received": ["Signature proof of delivery - EQ-46342.pdf. A one-page signature proof of delivery for disputed transaction EQ-46342, showing its date of issue as 12 January 2026. It is signed by the delivery driver.", "Customer account details page - EQ-46342.pdf. A one-page customer account details page for disputed transaction EQ-46342, with its date of issue shown as 4 April 2026.", "Chargeback response form - EQ-46342.pdf. A chargeback response form for disputed transaction EQ-46342, dated 14 January 2026. It runs to 2 pages, complete, and is signed by the payments disputes team lead.", "Transaction record printout - EQ-46342.pdf. A single-page transaction record printout for disputed transaction EQ-46342, issued on 26 March 2026.", "Customer order history extract - EQ-46342.pdf. A customer order history extract for disputed transaction EQ-46342, dated 27 November 2025. It is 2 pages, complete.", "Delivery confirmation - EQ-46342.pdf. A one-page delivery confirmation for disputed transaction EQ-46342, showing its date of issue as 29 November 2025.", "Fraud screening result sheet - EQ-46342.pdf. A single-page fraud screening result sheet for disputed transaction EQ-46342, dated 14 February 2026."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack satisfies the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-66", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 882}} {"id": "isc-te-00075-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Baxton Limited", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 April 2026"}, "checklist": ["Confirm the pack contains the marketing consent form, signed.", "Confirm the pack contains the nominated store preference form, signed.", "Confirm the pack contains the identity verification document, valid and not expired on the date of the review.", "Confirm the pack contains the loyalty scheme enrolment form, signed.", "If the customer is transferring points from a rival scheme, also: confirm the pack contains the points transfer evidence statement, issued within the last 3 months and signed.", "Confirm the pack contains the points transfer request, signed.", "Confirm the pack contains the terms and conditions acceptance sheet, signed."], "submission": {"case": {"name": "Katerina Wraxsall", "reference": "SQ-40557", "details": ["The customer is transferring points from a rival scheme."]}, "documents received": ["Loyalty scheme enrolment form - Katerina Wraxsall.pdf. This single-page loyalty scheme enrolment form concerning Katerina Wraxsall is dated 2 April 2026 and carries the signature of the customer.", "Nominated store preference form - Katerina Wraxsall.pdf. This single-page nominated store preference form concerning Katerina Wraxsall is dated 18 March 2026 and carries the signature of the customer.", "Customer contact details sheet - Katerina Wraxsall.pdf. This single-page customer contact details sheet concerning Katerina Wraxsall is dated 31 January 2026 and carries the signature of the customer.", "Identity verification document - Katerina Wraxsall.pdf. This single-page identity verification document concerning Katerina Wraxsall shows an expiry date of 4 May 2028.", "Terms and conditions acceptance sheet - Katerina Wraxsall.pdf. This single-page terms and conditions acceptance sheet concerning Katerina Wraxsall is dated 10 March 2026 and carries the signature of the customer.", "Marketing consent form - Katerina Wraxsall.pdf. This single-page marketing consent form concerning Katerina Wraxsall is dated 20 March 2026 and carries the signature of the customer.", "Points transfer request - Katerina Wraxsall.pdf. This single-page points transfer request concerning Katerina Wraxsall is dated 17 January 2026 and carries the signature of the customer.", "Points transfer evidence statement - Katerina Wraxsall.pdf. This single-page points transfer evidence statement concerning Katerina Wraxsall is dated 11 February 2026 and carries the signature of the customer.", "File 09.pdf. The contents of this file cannot be seen, as the scan is blank."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1001}} {"id": "isc-te-00107-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Maldmont plc", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "19 August 2026"}, "checklist": ["Product catalogue declaration, signed", "Returns policy statement, signed", "Anti-money laundering questionnaire, signed", "Authorised representative ID copy, valid (not expired) on the date of the review", "Bank account verification letter, issued within the last 3 months, signed", "Proof of trading address, issued within the last 3 months", "If the seller is a sole trader rather than a company, also: sole trader statutory declaration, signed"], "submission": {"case": {"name": "Silmont Ltd", "reference": "KC-98959", "details": ["The seller is a registered company."]}, "documents received": ["Silmont Ltd - authorised representative ID copy.pdf. A copy of the authorised representative's ID for Silmont Ltd, showing an expiry date of 7 October 2026. It is a single page.", "Silmont Ltd - anti-money laundering questionnaire.pdf. An anti-money laundering questionnaire for Silmont Ltd, dated 22 July 2026. It runs to 3 pages, complete, and is signed by a director of Silmont Ltd.", "Silmont Ltd - business registration certificate.pdf. A business registration certificate for Silmont Ltd, dated 29 May 2026. It is a single page.", "Silmont Ltd - returns policy statement.pdf. A returns policy statement for Silmont Ltd, dated 11 August 2026. It runs to 2 pages, complete, and is signed by a director of Silmont Ltd.", "Silmont Ltd - proof of trading address 4.pdf. A proof of trading address for Silmont Ltd, dated 25 May 2025. It is a single page.", "Silmont Ltd - product catalogue declaration.pdf. A product catalogue declaration for Silmont Ltd, dated 28 May 2026. It runs to 4 pages, complete, and is signed by a director of Silmont Ltd.", "Silmont Ltd - bank account verification letter.pdf. A bank account verification letter for Silmont Ltd, dated 13 June 2026. It is a single page and is signed by a bank officer."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack fulfils the checklist. Examine every checklist line that applies to this case. For a required document to count, it must be the kind listed (not a similar kind), be about the case's subject, have all its pages, be signed wherever the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line fails. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-11", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 876}} {"id": "isc-te-00342-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Hondhurst Group", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "6 April 2026"}, "checklist": ["If the institute hosts research involving human participants, also: ethics committee annual return (issued within the last 12 months, signed)", "doctoral researcher progress summary (issued within the last 6 months, signed)", "director's declaration of interests (issued within the last 12 months, signed)", "staffing plan (issued within the last 6 months, signed)", "annual activity report (issued within the last 6 months, signed)", "financial expenditure summary (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Oxlbury Inc", "reference": "QW-70395", "details": ["The institute hosts research involving human participants."]}, "documents received": ["directors declaration of interests.pdf — A director's declaration of interests for Oxlbury Inc, dated 15 April 2025, issued as a single page. It carries the director's signature.", "scanned document.pdf — The scan is too faint to read, so the contents of this file cannot be seen.", "publications list.pdf — A publications list for Oxlbury Inc, dated 30 December 2025. It runs to 4 pages, complete.", "staffing plan.pdf — A staffing plan for Oxlbury Inc, dated 24 October 2025. It runs to 2 pages, complete, and is signed by the institute director.", "financial expenditure summary.pdf — A financial expenditure summary for Oxlbury Inc, dated 27 January 2026. It runs to 3 pages, complete, and is signed by the institute finance officer.", "ethics committee annual return.pdf — An ethics committee annual return for Oxlbury Inc, dated 10 May 2025. It runs to 2 pages, complete, and carries the signature of the ethics committee chair.", "annual activity report.pdf — An annual activity report for Oxlbury Inc, dated 31 October 2025. It runs to 12 pages, complete, and is signed by the institute director.", "doctoral researcher progress summary.pdf — A doctoral researcher progress summary for Oxlbury Inc, dated 4 January 2026. It runs to 2 pages, complete, and is signed by the doctoral researcher's supervisor.", "directors declaration of interests.pdf — A director's declaration of interests for Oxlbury Inc, dated 17 July 2023, issued as a single page. It carries the director's signature.", "external advisory board minutes.pdf — External advisory board minutes for Oxlbury Inc, dated 6 February 2026. They run to 4 pages, complete, and are signed by the board chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 10, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 997}} {"id": "isc-te-00118-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Wynshaw Ltd", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "4 August 2026"}, "checklist": ["Witness list, signed.", "Investigator appointment letter, issued within the last 3 months.", "Evidence bundle index, signed.", "Adjustment request record, issued within the last 3 months, signed.", "Previous grievance outcome letter, issued within the last 24 months.", "Meeting invitation with rights explained, issued within the last 1 months."], "submission": {"case": {"name": "Sanne Ingson", "reference": "PI-43445"}, "cover note": "Please can you approve this pack as soon as possible? All the paperwork is in order.", "documents received": ["Witness list dated 25 April 2026 concerning Sanne Ingson. It is 1 page and is signed by the investigating officer.", "Evidence bundle index dated 11 June 2026 concerning Sanne Ingson. It is 2 pages, complete, and is signed by the case administrator.", "Adjustment request record dated 16 July 2026 concerning Sanne Ingson. It is 1 page and is signed by the HR adviser.", "Previous grievance outcome letter dated 3 October 2024 concerning Sanne Ingson. Only pages 1-1 of 2 are included.", "Investigator appointment letter dated 28 May 2026 concerning Sanne Ingson. It is 1 page.", "Meeting invitation with rights explained dated 24 July 2026 concerning Sanne Ingson. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 736}} {"id": "isc-te-00454-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Jundmouth Limited", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "25 March 2026"}, "checklist": ["Licence reassignment note, issued within the last 3 months, signed", "If the server will be sold or donated rather than destroyed, also: disposal vendor certificate of destruction, issued within the last 3 months, signed", "Decommission request form, signed", "Data wipe certificate, issued within the last 3 months, signed", "Data migration confirmation, issued within the last 3 months, signed", "Dependent systems check report, issued within the last 3 months"], "submission": {"case": {"name": "retired server NC-63421", "reference": "LV-96718", "details": ["The server will be sold or donated rather than destroyed."]}, "cover note": "Everything needed for this pack is attached and complete. Please let me know once the review is done.", "documents received": ["Single-page data wipe certificate for retired server NC-63421, dated 29 January 2026, signed by the disposal technician.", "Single-page licence reassignment note for retired server NC-63421, dated 10 March 2026, signed by the IT asset manager.", "Data migration confirmation for retired server NC-63421, dated 19 January 2026. 2 pages, complete. Signed by the systems migration lead.", "Single-page asset register update for retired server NC-63421, dated 21 March 2026.", "Decommission request form for retired server NC-63421, dated 4 February 2026. 2 pages, complete. Signed by the infrastructure operations manager.", "Dependent systems check report for retired server NC-63421, dated 13 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 810}} {"id": "isc-te-00130-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Halvness LLP", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "22 April 2026"}, "checklist": ["Trade references letter, issued within the last 3 months, signed", "Company registration certificate", "Bank reference letter, issued within the last 6 months, signed", "Personal guarantee, signed"], "submission": {"case": {"name": "Pravmark GmbH", "reference": "EM-15224"}, "cover note": "This pack has already been checked by a colleague, so it should be ready for your review.", "documents received": ["Company registration certificate for Pravmark GmbH, dated 5 January 2026. 2 pages, complete.", "Bank reference letter for Pravmark GmbH, dated 24 December 2025. 1 page. Signed by the bank's relationship manager.", "Trade references letter for Pravmark GmbH, dated 15 February 2026. 1 page. Signed by the referee's accounts manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 602}} {"id": "isc-te-00301-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Marlcliff Limited", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "3 March 2026"}, "checklist": ["Liability claim form, signed.", "Incident report from the day, issued within the last 3 months, signed.", "Photographs of the spillage on the floor, issued within the last 1 months.", "CCTV footage stills of the incident, issued within the last 3 months.", "Public liability insurance schedule.", "Cleaning log for the day of the incident, issued within the last 6 months, signed."], "submission": {"case": {"name": "Jundton Ltd", "reference": "EC-53915"}, "documents received": ["The shop's opening hours notice relating to Jundton Ltd, dated 1 February 2026. 2 pages, complete. Signed by the store manager.", "Cleaning log for the day of the incident relating to Jundton Ltd, dated 2 October 2025. Single page. Signed by the cleaner.", "Liability claim form relating to Jundton Ltd, dated 30 January 2026. 3 pages, complete. Signed by the claimant.", "Photographs of the spillage on the floor relating to Jundton Ltd, dated 25 February 2026. Single page.", "Public liability insurance schedule relating to Jundton Ltd, dated 22 February 2026. 4 pages, complete.", "CCTV footage stills of the incident relating to Jundton Ltd, dated 24 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 553}} {"id": "isc-te-00432-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Wynmark GmbH", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "14 September 2026"}, "checklist": ["Radiation safety training certificate, issued within the last 24 months and signed.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed.", "Photo identity document, valid (not expired) on the date of the review.", "Experiment safety clearance form, signed.", "Beam time or instrument booking confirmation."], "submission": {"case": {"name": "Noor Sabock", "reference": "VH-82380", "details": ["The researcher will work only during standard opening hours."]}, "documents received": ["Radiation safety training certificate for Noor Sabock, dated 6 April 2025, 1 page. It is signed by the radiation safety officer.", "Beam time or instrument booking confirmation for Noor Sabock, dated 8 August 2026, 1 page.", "Photo identity document for Noor Sabock showing an expiry date of 27 September 2026, 1 page.", "Experiment safety clearance form for Noor Sabock, dated 18 June 2026, 3 pages, complete. It is signed by the experiment safety coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 669}} {"id": "isc-te-00338-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Tarvvik SAS", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "7 September 2026"}, "checklist": ["Capacity assessment record, signed", "Proof of identity, valid (not expired) on the date of the review", "Safeguarding referral form, issued within the last 12 months, signed", "Support plan, signed"], "submission": {"case": {"name": "Claire Rumow", "reference": "KD-98368"}, "documents received": ["Benefit entitlement letters about Claire Rumow, dated 14 July 2026. All 2 of its 2 pages are included (2 pages, complete).", "Safeguarding referral form for Claire Rumow, dated 20 July 2026. All 2 of its 2 pages are included (2 pages, complete). Signed by the referring officer.", "Capacity assessment record for Claire Rumow, dated 30 July 2026. Only 3 of its 4 pages are included (pages 1-3 of 4). Signed by the assessing practitioner.", "Proof of identity for Claire Rumow. The expiry date shown is 5 October 2027. It is a single page.", "Support plan for Claire Rumow, dated 28 July 2026. All 6 of its 6 pages are included (6 pages, complete). Signed by the care coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 701}} {"id": "isc-te-00210-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jundstead BV", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "20 April 2026"}, "checklist": ["Production downtime log - confirm it was issued within the last 3 months and is signed", "Purchase invoice for the machine", "Repair or replacement quotation - confirm it was issued within the last 3 months", "Equipment breakdown claim form - confirm it is signed"], "submission": {"case": {"name": "failed machine BH-86750", "reference": "XI-70320"}, "documents received": ["Equipment breakdown claim form for failed machine BH-86750. Date of issue: 30 January 2026. 3 pages, complete. Signed by the policyholder.", "Production downtime log for failed machine BH-86750. Date of issue: 6 February 2026. 2 pages, complete. Signed by the production supervisor.", "Machine maintenance log for failed machine BH-86750. Date of issue: 12 April 2026. 5 pages, complete.", "File name: Document_0416.pdf. The file will not open, so its contents cannot be seen.", "Purchase invoice for the machine, for failed machine BH-86750. Date of issue: 11 March 2026. Single page.", "Repair or replacement quotation for failed machine BH-86750. Date of issue: 5 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 719}} {"id": "isc-te-00303-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Fravfell Partners", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "22 April 2026"}, "checklist": ["Staff training record for the duty manager, issued within the last 24 months and signed", "CCTV footage stills of the incident, issued within the last 3 months", "Incident report from the day, issued within the last 3 months and signed", "Cleaning log for the day of the incident, issued within the last 6 months and signed", "Witness statement from a staff member, signed"], "submission": {"case": {"name": "Dornmere LLP", "reference": "YX-91405"}, "documents received": ["Cleaning log for the day of the incident, Dornmere LLP, dated 24 January 2026. 1 page. The signature line is empty and the log is not signed.", "Public liability insurance schedule, Dornmere LLP, dated 15 January 2026. 4 pages, complete.", "Staff training record for the duty manager, Dornmere LLP, dated 2 May 2025. 2 pages, complete. Signed by the duty manager.", "Incident report from the day, Dornmere LLP, dated 11 February 2026. 2 pages, complete. Signed by the duty manager.", "CCTV footage stills of the incident, Dornmere LLP, dated 23 March 2026. 2 pages, complete.", "Witness statement from a staff member, Dornmere LLP, dated 11 April 2026. 1 page. Signed by the staff member who wrote it."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 752}} {"id": "isc-te-00164-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Pellwick Group", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "15 April 2026"}, "checklist": ["Facility access application form, signed.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed.", "Beam time or instrument booking confirmation.", "Insurance declaration for facility work, issued within the last 12 months, signed.", "Home institution endorsement letter, issued within the last 6 months, signed.", "Experiment safety clearance form, signed."], "submission": {"case": {"name": "Madison Harvberg", "reference": "HI-86494", "details": ["The researcher will work outside standard opening hours."]}, "documents received": ["facility_access_application_form_harvberg.pdf. A facility access application form for Madison Harvberg, dated 23 February 2026. 2 pages, complete. It is signed by the facility manager.", "experiment_safety_clearance_form_harvberg.pdf. An experiment safety clearance form for Madison Harvberg, dated 8 April 2026. 3 pages, complete. It is signed by the facility safety officer.", "insurance_declaration_facility_work_harvberg.pdf. An insurance declaration for facility work for Madison Harvberg, dated 29 April 2025. It is a single page and is signed by the home institution's insurance officer.", "home_institution_endorsement_letter_harvberg.pdf. A home institution endorsement letter for Madison Harvberg, dated 11 December 2025. It is a single page and is signed by the home institution's head of department.", "beam_time_booking_confirmation_harvberg.pdf. A beam time or instrument booking confirmation for Madison Harvberg, dated 25 December 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 790}} {"id": "isc-te-00047-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Teskbrook GmbH", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "17 March 2026"}, "checklist": ["Check that the audit summary report is present and signed.", "Check that the audit finding sheets are present and signed.", "Check that the internal audit plan is present, was issued within the last 12 months, and is signed.", "Check that the management review minutes are present and signed.", "If the audit found a major non-conformity, also check that the major non-conformity corrective action plan is present and signed."], "submission": {"case": {"name": "internal audit HH-1805", "reference": "IG-20637", "details": ["The audit found a major non-conformity."]}, "documents received": ["Major non-conformity corrective action plan HH-1805. Issued 10 December 2025, 3 pages, complete. Signed by the quality manager.", "Internal audit plan HH-1805. The date of issue is covered by a stamp. 2 pages, complete. Signed by the quality manager.", "Audit finding sheets HH-1805. Issued 1 January 2026, 2 pages, complete. Signed by the lead auditor.", "Audit summary report HH-1805. Issued 3 February 2026, 5 pages, complete. Signed by the lead auditor.", "Management review minutes HH-1805. Issued 13 February 2026, 4 pages, complete. Signed by the chair of the review board.", "Previous audit follow-up record HH-1805. Issued 21 April 2024, 2 pages, complete. Signed by the quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 777}} {"id": "isc-te-00058-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Orrfeld plc", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "14 August 2026"}, "checklist": ["Employment income summary, issued within the last 13 months", "Childcare payment receipt, issued within the last 13 months", "Bank interest statement, issued within the last 13 months", "Gift aid donation summary", "Tax return draft printout, signed"], "submission": {"case": {"name": "household tax affairs EZ-41809", "reference": "TK-75367"}, "documents received": ["childcare_payment_receipt.pdf. A childcare payment receipt about household tax affairs EZ-41809, dated 13 October 2025. It is a single page.", "employment_income_summary.pdf. An employment income summary about household tax affairs EZ-41809, dated 19 July 2026. 2 pages, complete.", "tax_return_draft_printout.pdf. A tax return draft printout about household tax affairs EZ-41809, dated 20 May 2026. 6 pages, complete. It carries the signature of the household's tax filer.", "pension_contribution_certificate.pdf. A pension contribution certificate about household tax affairs EZ-41809, dated 21 June 2026. 2 pages, complete.", "gift_aid_donation_summary.pdf. A gift aid donation summary about household tax affairs EZ-41809, dated 4 May 2026. It is a single page.", "bank_interest_statement.pdf. A bank interest statement about household tax affairs EZ-41809, dated 11 July 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 774}} {"id": "isc-te-00250-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Istfield & Co", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "4 May 2026"}, "checklist": ["If the institute received industry funding above the university's disclosure threshold, also include: industry funding disclosure statement (issued within the last 12 months, signed)", "Include: director's declaration of interests (issued within the last 12 months, signed)", "Include: external advisory board minutes (issued within the last 12 months, signed)", "Include: staffing plan (issued within the last 6 months, signed)", "If the institute hosts research involving human participants, also include: ethics committee annual return (issued within the last 12 months, signed)", "Include: publications list (issued within the last 12 months)", "Include: annual activity report (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Lombfeld Ltd", "reference": "EI-33164", "details": ["The institute received industry funding above the university's disclosure threshold.", "The institute hosts research involving human participants."]}, "cover note": "Please find attached the annual review pack for Lombfeld Ltd, reference EI-33164, for the committee's meeting on 4 May 2026. I am not sure that everything needed is in there, so please let me know if anything further is required.", "documents received": ["EI-33164_Publications_list_2025-09-20.pdf - Publications list for Lombfeld Ltd, dated 20 September 2025. 4 pages, complete.", "EI-33164_External_advisory_board_minutes_2025-06-18.pdf - External advisory board minutes for Lombfeld Ltd, dated 18 June 2025. 4 pages, complete. Signed by the advisory board chair.", "EI-33164_Industry_funding_disclosure_statement_2025-11-17.pdf - Industry funding disclosure statement for Lombfeld Ltd, dated 17 November 2025. Single page. Signed by the institute director.", "EI-33164_Annual_activity_report_2025-11-25.pdf - Annual activity report for Lombfeld Ltd, dated 25 November 2025. 12 pages, complete. Signed by the institute director.", "EI-33164_Ethics_committee_annual_return_2025-12-28.pdf - Ethics committee annual return for Lombfeld Ltd, dated 28 December 2025. 2 pages, complete. Signed by the ethics committee chair.", "EI-33164_Staffing_plan_2026-03-31.pdf - Staffing plan for Lombfeld Ltd, dated 31 March 2026. 2 pages, complete. Signed by the institute director.", "EI-33164_Directors_declaration_of_interests_2025-05-15.pdf - Director's declaration of interests for Lombfeld Ltd, dated 15 May 2025. Single page. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete when measured against the checklist. Go over every checklist line relevant to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, contain all its pages, carry a signature wherever the checklist asks for one, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': all applicable lines are met (extra documents do not matter). 'incomplete': at least one applicable line is unmet. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-45", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1105}} {"id": "isc-te-00236-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Haskmont Group", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "4 March 2026"}, "checklist": ["Scaffolding agreement, signed", "Insurance notification letter, issued within the last 6 months", "Meter reading photo, issued within the last 1 months", "Grid connection application, issued within the last 12 months, signed", "Planning permission letter, issued within the last 12 months"], "submission": {"case": {"name": "roof OS-53775", "reference": "WL-45574"}, "documents received": ["Planning permission letter for roof OS-53775, dated 18 March 2025. 2 pages, complete.", "Insurance notification letter for roof OS-53775, dated 29 December 2025. Single page.", "Scaffolding agreement for roof OS-53775, dated 1 February 2026. 2 pages, complete. Signed by the property owner.", "Meter reading photo for roof OS-53775, dated 28 February 2026. Single page.", "Electricity bill direct debit mandate for roof OS-53775, dated 22 November 2025. 2 pages, complete. Signed by the account holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 682}} {"id": "isc-te-00313-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Istshaw Partners", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "31 July 2026"}, "checklist": ["Cross-dock slot booking sheet, issued within the last 1 months and signed.", "Inbound unloading record, issued within the last 1 months and signed.", "Seal number log, issued within the last 1 months and signed.", "Transfer completion confirmation, issued within the last 1 months and signed.", "Load consolidation sheet, issued within the last 3 months and signed.", "If the transfer is an international movement, also: transit customs document, signed.", "Outbound loading record, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer TG-84110", "reference": "CV-81739", "details": ["The transfer is an international movement."]}, "documents received": ["Outbound loading record for cross-dock transfer TG-84110, dated 24 July 2026. Single page. Signed by the outbound loading team leader.", "Seal number log for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the outbound gatekeeper.", "Inbound unloading record for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the inbound unloading supervisor.", "Cross-dock slot booking sheet for cross-dock transfer TG-84110, dated 21 July 2026. Single page. The signature line is blank, so it is not signed.", "Transit customs document for cross-dock transfer TG-84110, dated 26 June 2026. 4 pages, complete. Signed by the customs agent.", "Transfer completion confirmation for cross-dock transfer TG-84110, dated 12 July 2026. Single page. Signed by the transport planner.", "Load consolidation sheet for cross-dock transfer TG-84110, dated 26 July 2026. 2 pages, complete. Signed by the load consolidation coordinator."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete: every applicable line is met (extra documents do not matter). Answer incomplete: at least one applicable line is not met. Answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-13", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 888}} {"id": "isc-te-00185-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Merslock & Co", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "25 March 2026"}, "checklist": ["Fixed asset register extract for the asset", "Sales invoice or receipt for the sale proceeds, issued within the last 3 months", "If the asset is being sold rather than scrapped, also: proof of payment received from the buyer, issued within the last 3 months", "Asset disposal request form, signed", "Written offer or valuation for the asset, issued within the last 6 months", "If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer, issued within the last 3 months", "Depreciation schedule for the asset to date", "Asset de-registration and tag removal record, signed"], "submission": {"case": {"name": "disposed asset JI-91007", "reference": "ER-48676", "details": ["The asset is being sold rather than scrapped.", "The asset is not a company car being part-exchanged."]}, "documents received": ["Asset_de-registration_and_tag_removal_record_JI-91007.pdf: An asset de-registration and tag removal record relating to disposed asset JI-91007, dated 6 February 2026. It is a single page and is signed by the group financial controller.", "Proof_of_payment_received_from_buyer_JI-91007.pdf: A proof of payment received from the buyer relating to disposed asset JI-91007. It is dated 2 March 2026 and is a single page.", "Asset_disposal_request_form_JI-91007.pdf: An asset disposal request form relating to disposed asset JI-91007, dated 6 December 2025. All 2 of its 2 pages are included, 2 pages, complete. It is signed by the group financial controller.", "Depreciation_schedule_JI-91007.pdf: A depreciation schedule for the asset to date relating to disposed asset JI-91007, dated 17 March 2026. All 2 of its 2 pages are included, 2 pages, complete.", "Written_offer_or_valuation_JI-91007.pdf: A written offer or valuation for the asset relating to disposed asset JI-91007, dated 2 January 2026. All 2 of its 2 pages are included, 2 pages, complete.", "Fixed_asset_register_extract_JI-91007.pdf: A fixed asset register extract for the asset relating to disposed asset JI-91007. It is dated 9 January 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 989}} {"id": "isc-te-00299-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Glenby Ltd", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "16 September 2026"}, "checklist": ["If the employee has caring responsibilities for a dependent, also: caring responsibilities statement (signed)", "client or service impact statement (signed)", "trial period proposal (signed)", "previous flexible working requests record (issued within the last 24 months)", "impact assessment on the team (signed)"], "submission": {"case": {"name": "Siobhan Nebbins", "reference": "XG-87607"}, "cover note": "Please can you check this pack and confirm whether anything else is needed, as I am not sure everything required is included.", "documents received": ["Impact assessment on the team about Siobhan Nebbins. Dated 9 June 2026. 3 pages, complete. Signed by the line manager.", "Trial period proposal about Siobhan Nebbins. Dated 12 July 2026. 1 page. Signed by the line manager.", "File name: Document 05. The scan is too faint to read, so its contents cannot be seen.", "Caring responsibilities statement about Siobhan Nebbins. Dated 2 July 2026. 1 page. Signed by Siobhan Nebbins.", "Previous flexible working requests record about Siobhan Nebbins. Dated 23 August 2025. 1 page.", "Client or service impact statement about Siobhan Nebbins. Dated 26 May 2026. 1 page. Signed by the line manager.", "Line manager opinion note about Siobhan Nebbins. Dated 16 August 2026. 2 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "document present (circumstance not stated), plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 767}} {"id": "isc-te-00265-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Ilvvale LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "6 April 2026"}, "checklist": ["Booking voucher, issued within the last 6 months", "Vehicle condition report, signed", "Passport, valid (not expired) on 6 April 2026, signed", "Additional driver authorisation form, signed", "Credit card in the driver's name, valid (not expired) on 6 April 2026, signed", "Driving licence, valid (not expired) on 6 April 2026, signed", "If the booking includes crossing a land border, also: cross-border travel permission, signed"], "submission": {"case": {"name": "Lucy Bixisey", "reference": "OV-98787", "details": ["The booking stays within one country."]}, "documents received": ["vehicle_condition_report_ov98787.pdf — Vehicle condition report for Lucy Bixisey. It shows its date of issue as 3 March 2026. It is 2 pages, complete. It is signed by the inspecting staff member.", "booking_voucher_ov98787.pdf — Booking voucher for Lucy Bixisey. It shows its date of issue as 20 December 2025. It is a single page.", "passport_ov98787.pdf — Passport for Lucy Bixisey. It shows its expiry date as 15 December 2027. It is a single page. It is signed by the passport holder.", "credit_card_ov98787.pdf — Credit card in the driver's name for Lucy Bixisey. It shows its expiry date as 18 November 2026. It is a single page. It is signed by the cardholder.", "additional_driver_authorisation_form_ov98787.pdf — Additional driver authorisation form for Lucy Bixisey. It shows its date of issue as 16 December 2025. It is a single page. It is signed by the named driver.", "driving_licence_ov98787.pdf — Driving licence for Lucy Bixisey. It shows its expiry date as 9 October 2026. It is 2 pages, complete. It is signed by the licence holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 891}} {"id": "isc-te-00446-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vorncourt Partners", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "11 March 2026"}, "checklist": ["Check that the pack contains a travel insurance quote issued within the last 1 month.", "Check that the pack contains a signed special requests note.", "Check that the pack contains a hotel availability printout issued within the last 1 month and signed.", "If the booking includes a child traveller, also check that the pack contains a child passport copy that is valid (not expired) on the date of the review.", "Check that the pack contains a signed booking request form."], "submission": {"case": {"name": "holiday booking LH-96959", "reference": "HA-14905", "details": ["The booking includes a child traveller."]}, "documents received": ["child-passport-copy-LH-96959.pdf — Child passport copy for holiday booking LH-96959. Its expiry date is 8 April 2027. Single page.", "booking-request-form-LH-96959.pdf — Booking request form for holiday booking LH-96959. Its date of issue is 2 February 2026. 2 pages, complete, signed by the customer.", "special-requests-note-LH-96959.pdf — Special requests note for holiday booking LH-96959. Its date of issue is 1 February 2026. Single page, signed by the customer.", "travel-insurance-quote-LH-96959.pdf — Travel insurance quote for holiday booking LH-96959. Its date of issue is 3 March 2026. 2 pages, complete.", "customer-feedback-survey-LH-96959.pdf — Customer feedback survey for holiday booking LH-96959. Its date of issue is 2 February 2026. 2 pages, complete, signed by the customer.", "hotel-availability-printout-LH-96959.pdf — Hotel availability printout for holiday booking LH-96959. Its date of issue is 21 February 2026. 2 pages, complete, signed by the reservations agent."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 874}} {"id": "isc-te-00019-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Xanvale LLP", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "26 March 2026"}, "checklist": ["If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "prerequisite certificate", "employer sponsorship letter (issued within the last 3 months, signed)", "cancellation policy acceptance (signed)", "payment confirmation (issued within the last 3 months)", "venue access instructions (issued within the last 3 months)", "course booking form (signed)"], "submission": {"case": {"name": "course booking HG-96006", "reference": "MZ-70767", "details": ["The course leads to a licensed qualification."]}, "documents received": ["Venue access instructions for course booking HG-96006, dated 17 January 2026. Single page.", "Delegate photo identification for course booking HG-96006, showing an expiry date of 7 December 2027. Single page.", "Course booking form for course booking HG-96006, dated 10 January 2026. 2 pages, complete. Signed by the course booking delegate.", "Cancellation policy acceptance for course booking HG-96006, dated 24 December 2025. Single page, signed by the course booking delegate.", "Prerequisite certificate for course booking HG-96006, dated 12 February 2026. Single page.", "Payment confirmation for course booking HG-96006, dated 11 January 2026. Single page.", "Employer sponsorship letter for course booking HG-96006, dated 23 February 2026. Single page, signed by the employer's authorised signatory."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 777}} {"id": "isc-te-00452-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Bravhaven Inc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "12 August 2026"}, "checklist": ["Leaver notification form, signed.", "Final payroll cut-off note, signed, issued within the last 1 months.", "Line manager confirmation, signed, issued within the last 1 months.", "Shared mailbox handover record, signed, issued within the last 1 months.", "Access rights inventory, issued within the last 1 months.", "Service desk ticket closure summary, issued within the last 1 months."], "submission": {"case": {"name": "Andrew Vellcombe", "reference": "CI-98740"}, "documents received": ["Service desk ticket closure summary for Andrew Vellcombe. The date is smudged and cannot be read. 3 pages, complete.", "Shared mailbox handover record for Andrew Vellcombe, dated 31 July 2026. 2 pages, complete. Signed by the shared mailbox administrator.", "Line manager confirmation for Andrew Vellcombe, dated 26 July 2026. Single page. Signed by the line manager.", "Equipment return receipt for Andrew Vellcombe, dated 1 August 2026. Single page. Signed by the IT asset coordinator.", "Final payroll cut-off note for Andrew Vellcombe, dated 22 July 2026. Single page. Signed by the payroll officer.", "Leaver notification form for Andrew Vellcombe, dated 3 May 2026. 2 pages, complete. Signed by the line manager.", "Access rights inventory for Andrew Vellcombe, dated 24 July 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 757}} {"id": "isc-te-00319-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Oskford BV", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "17 September 2026"}, "checklist": ["Supplier self-assessment report, issued within the last 12 months and signed.", "Certified quality management system certificate, valid (not expired) on the date of the review.", "Financial stability statement, issued within the last 12 months and signed.", "Raw material certificate of analysis, issued within the last 6 months and signed.", "If the supplier provides parts that are safety-critical, also: process failure mode and effects analysis, signed.", "Supplier audit report, issued within the last 24 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed."], "submission": {"case": {"name": "Elstfeld SAS", "reference": "QD-20096", "details": ["The supplier provides parts that are safety-critical."]}, "cover note": "Please could you approve this as quickly as possible, as all the paperwork is in order.", "documents received": ["Certified quality management system certificate for Elstfeld SAS. Expiry date: 8 March 2028. Single page.", "Supplier capacity declaration for Elstfeld SAS. Date of issue: 14 August 2026. 2 pages, complete. Signed by the supplier's operations manager.", "Financial stability statement for Elstfeld SAS. Date of issue: 6 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Raw material certificate of analysis for Elstfeld SAS. Date of issue: 6 July 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Supplier quality questionnaire for Elstfeld SAS. Date of issue: 29 January 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Supplier self-assessment report for Elstfeld SAS. Date of issue: 14 May 2026. 6 pages, complete. Signed by the supplier's quality manager.", "Supplier audit report for Elstfeld SAS. Date of issue: 6 January 2025. 8 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 871}} {"id": "isc-te-00222-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Pellmoor plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "2 March 2026"}, "checklist": ["Bank reference letter, issued within the last 6 months, signed", "Company registration certificate", "Signed credit terms agreement, signed", "Credit limit approval memo, issued within the last 1 months, signed", "Trade references letter, issued within the last 3 months, signed", "Only if the customer requests a credit limit above the standard cap, also: finance director sanction letter, issued within the last 1 months, signed"], "submission": {"case": {"name": "Ivrwick LLP", "reference": "RR-10016", "details": ["The customer requests a credit limit above the standard cap."]}, "documents received": ["Signed_credit_terms_agreement_Ivrwick_LLp_17Nov2025.pdf. Signed credit terms agreement for Ivrwick LLP, dated 17 November 2025. 4 pages, complete, signed by a partner of Ivrwick LLP.", "Credit_limit_approval_memo_Ivrwick_LLp_18Feb2026.pdf. Credit limit approval memo for Ivrwick LLP, dated 18 February 2026. 1 page, signed by the credit control manager.", "Company_registration_certificate_Ivrwick_LLp_9Nov2025.pdf. Company registration certificate for Ivrwick LLP, dated 9 November 2025. 2 pages, complete.", "Trade_references_letter_Ivrwick_LLp_4Jun2025.pdf. Trade references letter for Ivrwick LLP, dated 4 June 2025. 1 page, signed by the referee company's credit manager.", "Finance_director_sanction_letter_Ivrwick_LLp_14Feb2026.pdf. Finance director sanction letter for Ivrwick LLP, dated 14 February 2026. 1 page, signed by the finance director.", "Personal_guarantee_Ivrwick_LLp_16Feb2026.pdf. Personal guarantee for Ivrwick LLP, dated 16 February 2026. 2 pages, complete, signed by a director of Ivrwick LLP.", "Bank_reference_letter_Ivrwick_LLp_27Feb2026.pdf. Bank reference letter for Ivrwick LLP, dated 27 February 2026. 1 page, signed by the bank's relationship manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 917}} {"id": "isc-te-00453-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Tondbrook BV", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "20 July 2026"}, "checklist": ["Signed leaver notification form.", "Signed shared mailbox handover record, issued within the last 1 months.", "Signed final payroll cut-off note, issued within the last 1 months.", "If the leaver held privileged administrator accounts, also: signed privileged account revocation certificate, issued within the last 1 months.", "If the leaver is moving to a competitor, also: signed confidential data removal attestation, issued within the last 1 months.", "Signed non-disclosure reminder acknowledgement."], "submission": {"case": {"name": "Samuel Ingins", "reference": "QD-28899", "details": ["The leaver held no privileged administrator accounts.", "The leaver is moving to a competitor."]}, "documents received": ["leaver-notification-form-ingins.pdf - Leaver notification form for Samuel Ingins, dated 24 May 2026. 2 pages, complete. Signed by the line manager.", "non-disclosure-reminder-acknowledgement-ingins.pdf - Non-disclosure reminder acknowledgement for Samuel Ingins, dated 12 July 2026. Single page. Signed by Samuel Ingins.", "shared-mailbox-handover-record-ingins.pdf - Shared mailbox handover record for Samuel Ingins, dated 18 July 2026. 2 pages, complete. Signed by the IT service desk manager.", "confidential-data-removal-attestation-ingins.pdf - Confidential data removal attestation for Samuel Ingins, dated 4 July 2026. Single page. Signed by the information security officer.", "final-payroll-cut-off-note-ingins.pdf - Final payroll cut-off note for Samuel Ingins, dated 13 July 2026. Single page. Signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-50", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00208-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Urvmore SAS", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "3 September 2026"}, "checklist": ["Previous flexible working requests record, issued within the last 24 months", "Trial period proposal, signed", "Flexible working request form, signed", "Line manager opinion note, issued within the last 2 months and signed", "If the request is to work entirely from home, also: home working equipment checklist, signed"], "submission": {"case": {"name": "Hannah Wadingham", "reference": "IR-86010", "details": ["The request is to work entirely from home."]}, "documents received": ["Trial_period_proposal_2026-07-29.pdf. Trial period proposal for Hannah Wadingham, dated 29 July 2026. 1 page. Signed by the line manager.", "Flexible_working_request_form_2026-06-11_pages_1-3.pdf. Flexible working request form for Hannah Wadingham, dated 11 June 2026. 3 pages, complete. Signed by the employee.", "Previous_flexible_working_requests_record_2024-10-05.pdf. Previous flexible working requests record for Hannah Wadingham, dated 5 October 2024. 1 page.", "Line_manager_opinion_note_2026-08-28.pdf. Line manager opinion note for Hannah Wadingham, dated 28 August 2026. 2 pages, complete. Signed by the line manager.", "Home_working_equipment_checklist_2026-05-27.pdf. Home working equipment checklist for Hannah Wadingham, dated 27 May 2026. 2 pages, complete. Signed by the employee.", "Proposed_working_pattern_plan_2026-06-17.pdf. Proposed working pattern plan for Hannah Wadingham, dated 17 June 2026. 2 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 832}} {"id": "isc-te-00209-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Corvley Limited", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "29 May 2026"}, "checklist": ["Check that the proposed working pattern plan is included and signed.", "Check that the flexible working request form is included and signed.", "Check that the impact assessment on the team is included and signed.", "If the employee has caring responsibilities for a dependent, also: check that the caring responsibilities statement is included and signed.", "Check that the trial period proposal is included and signed."], "submission": {"case": {"name": "Harry Holtisey", "reference": "NC-90327", "details": ["The employee has caring responsibilities for a dependent."]}, "cover note": "Please find attached the pack for reference NC-90327. Everything needed is attached and complete.", "documents received": ["A proposed working pattern plan concerning Harry Holtisey, dated 4 May 2026. 2 pages, complete. Signed by the line manager.", "A trial period proposal concerning Harry Holtisey, dated 7 April 2026. Single page. Signed by the line manager.", "A flexible working request form concerning Harry Holtisey, dated 23 February 2026. 3 pages, complete. Signed by Harry Holtisey.", "A previous flexible working requests record concerning Harry Holtisey, dated 12 July 2025. Single page.", "An impact assessment on the team concerning Harry Holtisey, dated 1 February 2026. 3 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 727}} {"id": "isc-te-00310-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Pellcombe GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "28 August 2026"}, "checklist": ["Asbestos survey", "If the warehouse stores food products, also: food storage approval certificate, valid (not expired) on the date of the review", "Planning permission", "Racking inspection report, issued within the last 12 months, signed", "Fire safety certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "warehouse TI-60354", "reference": "YI-31010", "details": ["The warehouse stores food products."]}, "documents received": ["Food storage approval certificate for warehouse TI-60354, showing an expiry date of 7 February 2029. Single page.", "Utilities connection certificate for warehouse TI-60354, dated 21 May 2026. Single page.", "Asbestos survey for warehouse TI-60354, dated 15 July 2026. 5 pages, complete.", "Planning permission for warehouse TI-60354, dated 30 June 2026. 2 pages, complete.", "Fire safety certificate for warehouse TI-60354, showing an expiry date of 25 June 2028. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 690}} {"id": "isc-te-00137-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Fravmouth Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "15 July 2026"}, "checklist": ["Supplier quality questionnaire, issued within the last 12 months, signed.", "Supplier self-assessment report, issued within the last 12 months, signed.", "If the supplier provides parts that are safety-critical, also: process failure mode and effects analysis, signed.", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months, signed.", "Supplier audit report, issued within the last 24 months, signed.", "Financial stability statement, issued within the last 12 months, signed.", "Supplier capacity declaration, issued within the last 12 months, signed.", "Raw material certificate of analysis, issued within the last 6 months, signed."], "submission": {"case": {"name": "Mersley SAS", "reference": "XW-63469", "details": ["The supplier provides parts that are safety-critical.", "The supplier subcontracts part of the production."]}, "documents received": ["Supplier self-assessment report, Mersley SAS. Date of issue: 18 October 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Supplier corrective action plan, Mersley SAS. Date of issue: 8 May 2026. 3 pages, complete. Signed by the supplier's quality manager.", "Raw material certificate of analysis, Mersley SAS. Date of issue: 22 April 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Process failure mode and effects analysis, Mersley SAS. Date of issue: 1 June 2026. 9 pages, complete. Signed by the supplier's process engineer.", "Supplier quality questionnaire, Mersley SAS. Date of issue: 21 June 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Financial stability statement, Mersley SAS. Date of issue: 7 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Subcontractor approval record, Mersley SAS. Date of issue: 9 August 2025. 2 pages, complete. Signed by the supplier's quality manager.", "Supplier capacity declaration, Mersley SAS. Date of issue: 7 July 2025. 2 pages, complete. Signed by the supplier's operations manager.", "Supplier audit report, Mersley SAS. Date of issue: 19 March 2025. 8 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 783}} {"id": "isc-te-00485-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskstead GmbH", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "28 August 2026"}, "checklist": ["Confirm the pack contains the signed draft lease, signed.", "Confirm the pack contains the title information document.", "Confirm the pack contains the energy performance certificate, valid (not expired) on the date of the review.", "Confirm the pack contains the keys handover receipt, signed.", "Confirm the pack contains the stamp duty return, signed.", "If the lease term is longer than seven years, also: land registration application, signed."], "submission": {"case": {"name": "premises MU-15688", "reference": "AJ-54933", "details": ["The lease term is longer than seven years."]}, "documents received": ["Land registration application. Premises MU-15688. Date of issue: 21 May 2026. 2 pages, complete. Signed by the landlord.", "Title information document. Premises MU-15688. Date of issue: 10 August 2026. 3 pages, complete.", "Company search report. Premises MU-15688. Date of issue: 10 August 2026. 2 pages, complete.", "Energy performance certificate. Premises MU-15688. Expiry date: 15 December 2026. Single page.", "Signed draft lease. Premises MU-15688. Date of issue: 6 May 2026. 12 pages, complete. Signed by the landlord and the tenant.", "Stamp duty return. Premises MU-15688. Date of issue: 12 June 2026. 2 pages, complete. Signed by the tenant."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist. Go through every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete if every applicable line is met (extra documents do not matter). Choose incomplete if at least one applicable line is not met. Choose unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-30", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 795}} {"id": "isc-te-00480-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Zervshaw Inc", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "29 June 2026"}, "checklist": ["Photographs of flood water in the rooms, issued within the last 1 months", "Flood claim form, signed", "Loss adjuster's inspection report, issued within the last 6 months and signed", "Council flood warning notice, issued within the last 12 months", "If the property is a listed building, also: listed building consent for the repairs, signed", "Debris removal invoice, issued within the last 6 months"], "submission": {"case": {"name": "property TS-49863", "reference": "IK-32131", "details": ["The property is a listed building."]}, "documents received": ["Loss adjuster's inspection report for property TS-49863, dated 10 April 2026. 6 pages, complete. Signed by the loss adjuster.", "Drying contractor's certificate of completion for property TS-49863, dated 8 March 2026. 2 pages, complete. Signed by the drying contractor.", "Buildings insurance policy schedule for property TS-49863, dated 17 June 2026. 5 pages, complete.", "Listed building consent for the repairs at property TS-49863, dated 2 June 2026. 2 pages, complete. Signed by the council planning officer.", "Photographs of flood water in the rooms relating to property TS-49863, dated 26 June 2026. 3 pages, complete.", "Flood claim form for property TS-49863, dated 24 May 2026. 5 pages, complete. Signed by the policyholder.", "Debris removal invoice for property TS-49863, dated 15 January 2026. 1 page.", "Council flood warning notice for property TS-49863, dated 16 August 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 849}} {"id": "isc-te-00321-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Elstheim & Co", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "25 March 2026"}, "checklist": ["Two-factor authentication confirmation, issued within the last 3 months", "Account purpose statement", "Account closure procedure", "If the account will be run by an external agency, also: agency access agreement, signed", "Platform terms acceptance record, signed", "Naming convention approval, signed", "Account request form, signed"], "submission": {"case": {"name": "new social media account XI-38854", "reference": "TG-11955", "details": ["The account will be run entirely by in-house staff."]}, "cover note": "Apologies that this pack was put together in a rush. Thank you for your understanding.", "documents received": ["naming_convention_approval_XI-38854.pdf — A naming convention approval for new social media account XI-38854, dated 15 March 2026. It is signed by the brand governance lead and is a single page.", "account_purpose_statement_XI-38854.pdf — An account purpose statement for new social media account XI-38854, dated 3 March 2026. It is a single page.", "platform_terms_acceptance_record_XI-38854.pdf — A platform terms acceptance record for new social media account XI-38854, dated 31 January 2026. It is signed by the account owner and is a single page.", "account_closure_procedure_XI-38854.pdf — An account closure procedure for new social media account XI-38854, dated 7 December 2025. It is a single page.", "account_request_form_XI-38854.pdf — An account request form for new social media account XI-38854, dated 19 January 2026. It is signed by the requesting marketing manager and is a single page.", "two_factor_authentication_confirmation_XI-38854.pdf — A two-factor authentication confirmation for new social media account XI-38854, dated 23 March 2026. It is a single page.", "password_policy_XI-38854.pdf — A password policy document for new social media account XI-38854, dated 23 March 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack fulfils the checklist. Work through every checklist line relevant to this case. For a required document to count, it must be the kind of document the checklist lists (a similar one will not do), be about the subject of the case, have all its pages, be signed in every place the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, but at least one cannot be settled from what is shown, for instance when a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may prove misleading; evaluate the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-38", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 936}} {"id": "isc-te-00420-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ebrfield plc", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "10 September 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed", "Anti-bribery policy statement, signed", "Supplier declaration of no conflicts of interest, signed", "Certificate of incorporation", "Supplier registration form, signed"], "submission": {"case": {"name": "Maldcrest Partners", "reference": "LF-56948", "details": ["The supplier is a foreign company."]}, "cover note": "Please accept my apologies for this pack being put together in a rush. I would appreciate your review of it as soon as you are able. Kind regards, Marco Wadingham", "documents received": ["Supplier declaration of no conflicts of interest - Maldcrest Partners.pdf\nA single-page supplier declaration of no conflicts of interest for Maldcrest Partners, dated 4 July 2026. It is signed by a director of Maldcrest Partners.", "General terms and conditions - Maldcrest Partners.pdf\nA signed copy of the general terms and conditions for Maldcrest Partners, dated 7 July 2026. It is 6 pages, complete, and signed by a director of Maldcrest Partners.", "Anti-bribery policy statement - Maldcrest Partners.pdf\nAn anti-bribery policy statement for Maldcrest Partners, dated 18 August 2026. It is 2 pages, complete, and signed by a director of Maldcrest Partners.", "Bank details confirmation letter - Maldcrest Partners.pdf\nA single-page bank details confirmation letter for Maldcrest Partners, dated 14 August 2026. It is signed by a bank officer.", "Supplier registration form - Maldcrest Partners.pdf\nA supplier registration form for Maldcrest Partners, dated 3 June 2026. It is 3 pages, complete, and signed by a director of Maldcrest Partners.", "Certified translation of the certificate of incorporation - Maldcrest Partners.pdf\nA certified translation of the certificate of incorporation for Maldcrest Partners, dated 12 August 2026. It is 2 pages, complete, and signed by a certified translator.", "Certificate of incorporation - Maldcrest Partners.pdf\nA certificate of incorporation for Maldcrest Partners, dated 19 May 2026. It is 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 912}} {"id": "isc-te-00125-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Fravberg LLP", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "6 April 2026"}, "checklist": ["Check for a signed stamp duty return.", "Check for a company search report issued within the last 1 months.", "If the lease term is longer than seven years, also check for a signed land registration application.", "Check for a signed guarantor consent letter.", "If the tenant is a newly formed company, also check for a signed parent company guarantee (signed).", "Check for a signed draft lease."], "submission": {"case": {"name": "premises AA-3696", "reference": "GR-61853", "details": ["The lease term is longer than seven years.", "The tenant is a newly formed company."]}, "cover note": "Everything needed is attached and complete. The pack is ready for your review.", "documents received": ["Draft lease - premises AA-3696.pdf — Signed draft lease for premises AA-3696, dated 18 December 2025. 12 pages, complete. Signed by the landlord and the tenant.", "Parent company guarantee - premises AA-3696.pdf — Signed parent company guarantee for premises AA-3696, dated 1 January 2026. 3 pages, complete. Signed by a director of the parent company.", "Land registration application - premises AA-3696.pdf — Land registration application for premises AA-3696, dated 3 January 2026. 2 pages, complete. Signed by the landlord's solicitor.", "Guarantor consent letter - premises AA-3696.pdf — Guarantor consent letter for premises AA-3696, dated 2 March 2026. 1 page. Signed by the guarantor.", "Stamp duty return - premises AA-3696.pdf — Stamp duty return for premises AA-3696, dated 8 January 2026. 2 pages, complete. Signed by the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 827}} {"id": "isc-te-00426-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Corvfell plc", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "9 April 2026"}, "checklist": ["Confirm the pack contains a medical examination certificate issued within the last 6 months and signed.", "Confirm the pack contains a photo driving licence that is valid, not expired, on the date of the review.", "Confirm the pack contains a right to work share code printout issued within the last 3 months.", "Confirm the pack contains a passport style photograph issued within the last 6 months.", "Confirm the pack contains a knowledge test pass certificate.", "If the applicant has lived at an address outside the country in the last five years, also confirm the pack contains a criminal record certificate from overseas issued within the last 3 months."], "submission": {"case": {"name": "Emily Lamova", "reference": "XZ-10465", "details": ["The applicant has lived at the same address in the country for the last five years."]}, "documents received": ["Medical examination certificate for Emily Lamova, dated 21 November 2025. 2 pages, complete. Signed by a doctor.", "Knowledge test pass certificate for Emily Lamova, dated 29 January 2026. Single page.", "Right to work share code printout for Emily Lamova, dated 21 February 2026. Single page.", "Passport style photograph of Emily Lamova, dated 4 January 2026. Single page.", "Licence application form for Emily Lamova, dated 27 December 2025. 6 pages, complete. Signed by the applicant.", "File scanned as item09.pdf: the page is upside down and the scan is too blurred to read, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 764}} {"id": "isc-te-00136-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Tondside Partners", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "12 May 2026"}, "checklist": ["Previous audit follow-up record, issued within the last 24 months, signed.", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list, signed.", "Audit finding sheets, signed.", "Audit interview notes, signed.", "Management review minutes, signed.", "Audit checklist for each area visited, signed.", "Internal audit plan, issued within the last 12 months, signed."], "submission": {"case": {"name": "internal audit MX-72526", "reference": "LS-20464", "details": ["The audit did not cover the calibration laboratory."]}, "documents received": ["Internal audit plan - MX-72526.pdf. The plan covers internal audit MX-72526 and is dated 14 August 2025. It runs to 2 pages, complete, and is signed by the quality manager.", "Audit interview notes - MX-72526.pdf. The notes were taken during internal audit MX-72526 and are dated 10 February 2026. They run to 3 pages, complete, and are signed by the auditor who conducted the interviews.", "Job interview record for a new hire - MX-72526.pdf. The record relates to a job interview for a new hire connected with internal audit MX-72526 and is dated 10 February 2026. It runs to 3 pages, complete, and is signed by the hiring supervisor.", "Audit finding sheets - MX-72526.pdf. The sheets cover internal audit MX-72526 and show a date of issue of 22 January 2026. They run to 2 pages, complete, and are signed by the lead auditor.", "Previous audit follow-up record - MX-72526.pdf. The record relates to internal audit MX-72526 and is dated 23 September 2025. It runs to 2 pages, complete, and is signed by the lead auditor.", "Audit summary report - MX-72526.pdf. The report summarises internal audit MX-72526 and is dated 23 April 2026. It runs to 5 pages, complete, and is signed by the lead auditor.", "Audit attendance sheet - MX-72526.pdf. The sheet records attendance at internal audit MX-72526 and is dated 17 March 2026. It is a single page and is signed by the lead auditor.", "Audit checklist for each area visited - MX-72526.pdf. The checklists relate to internal audit MX-72526 and are dated 2 April 2026. They run to 4 pages, complete, and are signed by the auditor for each area.", "Management review minutes - MX-72526.pdf. The minutes concern internal audit MX-72526 and are dated 20 February 2026. They run to 4 pages, complete, and are signed by the chair of the review board."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1094}} {"id": "isc-te-00328-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Ebrmont BV", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "30 April 2026"}, "checklist": ["Three most recent payslips, issued within the last 3 months.", "Passport, valid (not expired) on the date of the review.", "Three months of bank statements, issued within the last 3 months.", "Gifted deposit letter, issued within the last 3 months and signed.", "Property valuation report, issued within the last 3 months and signed."], "submission": {"case": {"name": "Jonas Radton", "reference": "OO-69836"}, "documents received": ["Passport for Jonas Radton, showing an expiry date of 31 August 2027. 2 pages, complete.", "Gifted deposit letter for Jonas Radton, dated 16 April 2026. 1 page, signed by the donor of the gift.", "Mortgage application form for Jonas Radton, dated 20 April 2026. 10 pages, complete. Signed by the applicant, Jonas Radton.", "Three months of bank statements for Jonas Radton, issued on 24 February 2026. 9 pages, complete.", "Property valuation report for Jonas Radton, dated 26 March 2026. 8 pages, complete. Signed by the valuer.", "Three most recent payslips for Jonas Radton, dated 2 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 712}} {"id": "isc-te-00212-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Austbury plc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "13 July 2026"}, "checklist": ["Public liability insurance schedule", "Witness statement from a staff member, signed", "Liability claim form, signed", "CCTV footage stills of the incident, issued within the last 3 months", "Incident report from the day, issued within the last 3 months, signed", "Staff training record for the duty manager, issued within the last 24 months, signed"], "submission": {"case": {"name": "Boltdale plc", "reference": "IQ-71848"}, "documents received": ["Public liability insurance schedule relating to Boltdale plc, dated 4 June 2026. 4 pages, complete.", "Witness statement from a staff member relating to Boltdale plc, dated 3 July 2026. Single page, signed by the staff member.", "Liability claim form relating to Boltdale plc, dated 6 May 2026. 3 pages, complete, signed by the claimant.", "CCTV footage stills of the incident relating to Boltdale plc, dated 25 May 2026. 2 pages, complete.", "Incident report from the day relating to Boltdale plc, dated 29 March 2026. 2 pages, complete, signed by the duty manager.", "Staff training record for the duty manager relating to Boltdale plc, dated 31 August 2025. 2 pages, complete, signed by the duty manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 737}} {"id": "isc-te-00042-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Cindburg Group", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "16 March 2026"}, "checklist": ["Outbound loading record, issued within the last 1 months, signed", "Seal number log, issued within the last 1 months, signed", "Load consolidation sheet, issued within the last 3 months, signed", "Transfer manifest, signed", "Inbound unloading record, issued within the last 1 months, signed", "Damaged goods exception sheet, issued within the last 1 months, signed"], "submission": {"case": {"name": "cross-dock transfer BE-71642", "reference": "UP-20974"}, "documents received": ["Damaged goods exception sheet for cross-dock transfer BE-71642, dated 14 March 2026. Single page. Signed by the inbound unloading supervisor.", "Outbound loading record for cross-dock transfer BE-71642, dated 27 February 2026. Single page. Signed by the outbound loading supervisor.", "Transfer manifest for cross-dock transfer BE-71642, dated 20 November 2025. 3 pages, complete. Signed by the transport planner.", "Load consolidation sheet for cross-dock transfer BE-71642. The date of issue is obscured by a stamp. 2 pages, complete. Signed by the load consolidation supervisor.", "Inbound unloading record for cross-dock transfer BE-71642, dated 5 March 2026. Single page. Signed by the inbound unloading supervisor.", "Seal number log for cross-dock transfer BE-71642, dated 8 March 2026. Single page. Signed by the outbound loading supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 778}} {"id": "isc-te-00041-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Creskheim & Co", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "23 April 2026"}, "checklist": ["Company registration certificate.", "Trade references letter, issued within the last 3 months, signed.", "Credit reference agency report, issued within the last 3 months.", "If the customer is a newly incorporated company, also: director identification record, signed.", "Bank reference letter, issued within the last 6 months, signed.", "Signed credit terms agreement, signed.", "Credit limit approval memo, issued within the last 1 months, signed.", "If the customer requests a credit limit above the standard cap, also: finance director sanction letter, issued within the last 1 months, signed."], "submission": {"case": {"name": "Ivrfeld & Co", "reference": "QG-16044", "details": ["The customer is a newly incorporated company.", "The customer requests a credit limit above the standard cap."]}, "documents received": ["Company registration certificate for Ivrfeld & Co. Date of issue: 23 March 2026. 2 pages, complete.", "Signed credit terms agreement for Ivrfeld & Co. Date of issue: 1 January 2026. 4 pages, complete. Signed by the customer.", "Trade references letter for Ivrfeld & Co. Date of issue: 3 April 2026. Single page. Signed by the referee.", "Credit limit approval memo for Ivrfeld & Co. Date of issue: 14 April 2026. Single page. Signed by the credit manager.", "Personal guarantee for Ivrfeld & Co. Date of issue: 28 March 2026. 2 pages, complete. Signed by the guarantor.", "Bank statement showing the applicant's balance for Ivrfeld & Co. Date of issue: 2 April 2026. Single page. Signed by the bank manager.", "Credit reference agency report for Ivrfeld & Co. Date of issue: 17 April 2026. 6 pages, complete.", "Director identification record for Ivrfeld & Co. Date of issue: 5 January 2026. 2 pages, complete. Signed by a director.", "Finance director sanction letter for Ivrfeld & Co. Date of issue: 5 April 2026. Single page. Signed by the finance director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 907}} {"id": "isc-te-00168-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Esklock Group", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "9 April 2026"}, "checklist": ["Go-live sign-off certificate, issued within the last 1 months, signed.", "Payment gateway technical specification.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review.", "Penetration test summary, issued within the last 6 months, signed.", "Fraud screening configuration sheet, signed."], "submission": {"case": {"name": "payment gateway UC-28398", "reference": "VH-98812", "details": ["The gateway will store customers' card details."]}, "documents received": ["Penetration test summary for payment gateway UC-28398. Date of issue: 28 December 2025. 3 pages, complete. Signed by the IT Security Test Lead.", "Card storage compliance certificate for payment gateway UC-28398. Expiry date: 17 July 2027. 2 pages, complete.", "Fraud screening configuration sheet for payment gateway UC-28398. Date of issue: 28 December 2025. 1 page, signed by the Fraud Screening Analyst.", "Test environment transaction log for payment gateway UC-28398. Date of issue: 6 April 2026. 4 pages, complete.", "Go-live sign-off certificate for payment gateway UC-28398. Date of issue: 5 April 2026. 1 page, signed by the Head of Payments Operations.", "Payment gateway technical specification for payment gateway UC-28398. Date of issue: 27 March 2026. Pages 1 to 1 of 8 are included."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and determine completeness. Check each checklist line that applies to this case. A required document counts only if it matches the listed document kind (not something similar), deals with the subject of the case, has all pages intact, is signed wherever the checklist calls for a signature, had not expired by the review date, and was issued within the timeframe the checklist permits. A conditional line is applicable only if its circumstance holds for the case. complete: all applicable lines are met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, yet at least one cannot be resolved from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead you; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-8", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 791}} {"id": "isc-te-00224-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Uldvale plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "9 June 2026"}, "checklist": ["If the customer requests a credit limit above the standard cap, also: finance director sanction letter (issued within the last 1 months, signed)", "Trade references letter (issued within the last 3 months, signed)", "Credit reference agency report (issued within the last 3 months)", "Personal guarantee (signed)", "Bank reference letter (issued within the last 6 months, signed)", "Signed credit terms agreement (signed)", "Company registration certificate"], "submission": {"case": {"name": "Holthorpe Limited", "reference": "ES-61445"}, "documents received": ["Personal guarantee - Holthorpe Limited.pdf - Personal guarantee about Holthorpe Limited, dated 20 February 2026. It is 2 pages, complete. It is signed by the guarantor.", "Credit reference agency report - Holthorpe Limited.pdf - Credit reference agency report about Holthorpe Limited, dated 26 May 2026. It is 6 pages, complete.", "Trade references letter - Holthorpe Limited.pdf - Trade references letter about Holthorpe Limited, dated 3 April 2026. It is 1 page. It is signed by a director of the referee company.", "Credit limit approval memo - Holthorpe Limited.pdf - Credit limit approval memo about Holthorpe Limited, dated 27 May 2026. It is 1 page. It is signed by the credit control manager.", "Bank reference letter - Holthorpe Limited.pdf - Bank reference letter about Holthorpe Limited, dated 14 March 2026. It is 1 page. It is signed by the bank manager.", "Signed credit terms agreement - Holthorpe Limited.pdf - Signed credit terms agreement about Holthorpe Limited, dated 31 March 2026. It is 4 pages, complete. It is signed by a director of Holthorpe Limited.", "Company registration certificate - Holthorpe Limited.pdf - Company registration certificate about Holthorpe Limited, dated 2 April 2026. It is 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 873}} {"id": "isc-te-00083-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Pravholm SAS", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "23 March 2026"}, "checklist": ["Confirm the pack contains a localisation completeness report issued within the last 1 months.", "Confirm the pack contains a store listing description issued within the last 1 months.", "Confirm the pack contains a crash-free rate report issued within the last 1 months.", "Confirm the pack contains a privacy policy update issued within the last 3 months.", "If the mobile app release adds a new payment feature, also confirm the pack contains a payment provider compliance checklist issued within the last 3 months and signed.", "Confirm the pack contains a marketing screenshot pack.", "If the mobile app release includes third-party analytics, also confirm the pack contains an analytics data consent statement issued within the last 3 months and signed.", "Confirm the pack contains an age rating questionnaire that is signed."], "submission": {"case": {"name": "mobile app release QZ-19484", "reference": "HT-41661", "details": ["The mobile app release adds a new payment feature.", "The mobile app release includes no third-party analytics."]}, "cover note": "I am sending the release pack for QZ-19484, but I am not sure everything needed is there. Please let me know if anything is missing.", "documents received": ["Age rating questionnaire, mobile app release QZ-19484. Date of issue: 14 February 2026. 2 pages, complete. Signed by the release manager.", "Marketing screenshot pack, mobile app release QZ-19484. Date of issue: 17 March 2026. 6 pages, complete.", "Store listing description, mobile app release QZ-19484. Date of issue: 7 March 2026. Single page.", "Localisation completeness report, mobile app release QZ-19484. Date of issue: 12 March 2026. 2 pages, complete.", "Privacy policy update, mobile app release QZ-19484. Date of issue: 7 January 2026. 2 pages, complete.", "Crash-free rate report, mobile app release QZ-19484. Date of issue: 18 March 2026. Single page.", "Payment provider compliance checklist, mobile app release QZ-19484. Date of issue: 11 February 2026. 3 pages, complete. Signed by the team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "partial", "defect": "signed", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 951}} {"id": "isc-te-00365-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Jarlthorpe plc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "2 March 2026"}, "checklist": ["Outstanding advance clearance check, signed.", "Employee bank detail confirmation, issued within the last 6 months and signed.", "Payroll deduction agreement for recovery of the advance, signed.", "Travel advance request form, signed."], "submission": {"case": {"name": "Noor Plumden", "reference": "BH-90150"}, "cover note": "Here is the pack for Noor Plumden, reference BH-90150. All the paperwork is in order, so a quick approval would be much appreciated.", "documents received": ["Payroll deduction agreement for recovery of the advance for Noor Plumden. The document is dated 24 November 2025 and is a single page. It is signed by the payroll officer.", "Travel advance request form for Noor Plumden. The document is dated 21 February 2025 and is a single page. It is signed by Noor Plumden.", "Employee bank detail confirmation for Noor Plumden. The document is dated 22 November 2025 and is a single page. It is signed by the payroll officer.", "Travel policy extract showing advance eligibility for Noor Plumden. The document is dated 23 January 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 688}} {"id": "isc-te-00003-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Quorfell Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "18 June 2026"}, "checklist": ["Check that the pack includes a signed post-change test plan.", "Check that the pack includes a current rule set export issued within the last 1 month.", "Check that the pack includes a signed firewall change request form.", "Check that the pack includes a peer review checklist issued within the last 1 month and signed."], "submission": {"case": {"name": "firewall change JC-89924", "reference": "GT-12592"}, "documents received": ["jc-89924_peer_review_checklist.pdf. Peer review checklist for firewall change JC-89924, dated 2 June 2026. Single page. Signed by the reviewing network security analyst.", "jc-89924_firewall_change_request_form_v1.pdf. Firewall change request form for firewall change JC-89924, dated 15 March 2026. 3 pages, complete. The signature line is empty, so the form is not signed.", "jc-89924_current_rule_set_export.pdf. Current rule set export for firewall change JC-89924, dated 5 June 2026. 8 pages, complete.", "jc-89924_post-change_test_plan.pdf. Post-change test plan for firewall change JC-89924, dated 16 May 2026. 2 pages, complete. Signed by the lead network security engineer."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and say whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must concern the subject of the case, all its pages must be present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "variant-0", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 746}} {"id": "isc-te-00115-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Prydwyn LLP", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "7 April 2026"}, "checklist": ["Previous grievance outcome letter, issued within the last 24 months", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed", "Meeting invitation with rights explained, issued within the last 1 months", "Adjustment request record, issued within the last 3 months, signed", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed", "Witness list, signed", "Investigator appointment letter, issued within the last 3 months", "Grievance procedure acknowledgement, issued within the last 3 months, signed"], "submission": {"case": {"name": "Helen Zellcombe", "reference": "JL-16752", "details": ["The grievance makes no allegation of bullying.", "The grievance is against the employee's direct manager."]}, "cover note": "Please find attached the grievance hearing pack for Helen Zellcombe, reference JL-16752. Everything needed is attached and complete.", "documents received": ["Alternative manager reporting line note concerning Helen Zellcombe, dated 28 December 2025. 1 page. Signed by the alternative manager.", "Investigator appointment letter concerning Helen Zellcombe, dated 2 April 2026. 1 page.", "Previous grievance outcome letter concerning Helen Zellcombe, dated 19 December 2024. 2 pages, complete.", "Witness list concerning Helen Zellcombe, dated 1 April 2026. 1 page. Signed by the case handler.", "Adjustment request record concerning Helen Zellcombe, dated 10 March 2026. 1 page. Signed by the employee.", "Meeting invitation with rights explained concerning Helen Zellcombe, dated 5 April 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every line of the checklist that applies here. A required document only counts if it is the type of document listed (not a similar type), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it had not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-1", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00281-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Brenfell Group", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "31 August 2026"}, "checklist": ["Confirmation of contact details, issued within the last 3 months", "Account statement showing recent activity, issued within the last 1 months", "Delivery address confirmation, signed", "Signature verification record, signed", "Lost card declaration, signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed"], "submission": {"case": {"name": "Siobhan Thornmore", "reference": "HK-69511", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["Temporary overseas address registration form for Siobhan Thornmore, dated 5 June 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Signature verification record for Siobhan Thornmore, dated 22 August 2026. Single page. Signed by the bank officer who carried out the verification.", "Lost card declaration for Siobhan Thornmore, dated 9 August 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Confirmation of contact details in the name of Siobhan Thornmore, dated 13 July 2026. Single page.", "Note about a damaged card in the name of Siobhan Thornmore, dated 9 August 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Account statement showing recent activity for Siobhan Thornmore, dated 29 August 2026. 3 pages, complete.", "Delivery address confirmation for Siobhan Thornmore, dated 21 July 2026. Single page. Signed by the cardholder, Siobhan Thornmore."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00049-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Kenvston Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "24 April 2026"}, "checklist": ["If the audit found a major non-conformity, also: major non-conformity corrective action plan (signed)", "audit interview notes (signed)", "internal audit plan (issued within the last 12 months, signed)", "audit attendance sheet (signed)", "audit checklist for each area visited (signed)"], "submission": {"case": {"name": "internal audit CD-75948", "reference": "DM-54948", "details": ["The audit found a major non-conformity."]}, "documents received": ["audit_checklist_CD-75948.pdf - Audit checklist for each area visited under internal audit CD-75948. Date of issue: 17 January 2026. 4 pages, complete. Signed by the lead auditor.", "audit_attendance_sheet_CD-75948.pdf - Audit attendance sheet for internal audit CD-75948. Date of issue: 23 February 2026. 1 page. Signed by the lead auditor.", "previous_audit_follow-up_record_CD-75948.pdf - Previous audit follow-up record for internal audit CD-75948. Date of issue: 25 August 2025. 2 pages, complete. Signed by the lead auditor.", "internal_audit_plan_CD-75948.pdf - Internal audit plan for internal audit CD-75948. Date of issue: 23 December 2025. 2 pages, complete. Signed by the lead auditor.", "audit_interview_notes_CD-75948.pdf - Audit interview notes for internal audit CD-75948. Date of issue: 2 February 2026. 3 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00390-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Abrton Inc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "4 March 2026"}, "checklist": ["If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed", "liability claim form, signed", "public liability insurance schedule", "CCTV footage stills of the incident, issued within the last 3 months", "witness statement from a staff member, signed", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed", "photographs of the spillage on the floor, issued within the last 1 months", "cleaning log for the day of the incident, issued within the last 6 months and signed"], "submission": {"case": {"name": "Marlfeld GmbH", "reference": "IL-48734", "details": ["The customer is handling the claim personally.", "The injured customer did not go to hospital."]}, "documents received": ["staff training record for the duty manager - Marlfeld GmbH.pdf. Staff training record for the duty manager about Marlfeld GmbH, dated 28 February 2026. 2 pages, complete. Signed by the duty manager.", "cleaning log for the day of the incident - Marlfeld GmbH.pdf. Cleaning log for the day of the incident about Marlfeld GmbH, dated 12 October 2025. Single page. Signed by the cleaner on duty that day.", "CCTV footage stills of the incident - Marlfeld GmbH.pdf. CCTV footage stills of the incident about Marlfeld GmbH, dated 25 December 2025. 2 pages, complete.", "photographs of the spillage on the floor - Marlfeld GmbH.pdf. Photographs of the spillage on the floor about Marlfeld GmbH, dated 16 February 2026. Single page.", "liability claim form - Marlfeld GmbH.pdf. Liability claim form about Marlfeld GmbH, dated 10 December 2025. 3 pages, complete. Signed by the customer.", "witness statement from a staff member - Marlfeld GmbH.pdf. Witness statement from a staff member about Marlfeld GmbH, dated 14 January 2026. Single page. Signed by the staff member who made the statement."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Examine each checklist line that applies here. A required document counts only if it is the kind of document listed (not a similar one), relates to the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can mislead, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-46", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 916}} {"id": "isc-te-00430-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Quelston Ltd", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "13 March 2026"}, "checklist": ["If the researcher will work outside standard opening hours, also: out-of-hours access authorisation (signed)", "insurance declaration for facility work (issued within the last 12 months, signed)", "photo identity document (valid (not expired) on the date of the review)", "radiation safety training certificate (issued within the last 24 months, signed)", "home institution endorsement letter (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Faisal Ebbopoulos", "reference": "VC-78895", "details": ["The researcher will work only during standard opening hours."]}, "cover note": "This pack was already checked by a colleague before it was sent on. Please review it as normal.", "documents received": ["Radiation safety training certificate, in the name of Faisal Ebbopoulos, dated 3 September 2024. 1 page, signed by the radiation safety officer.", "Insurance declaration for facility work, in the name of Faisal Ebbopoulos, dated 1 July 2025. 1 page, signed by the visiting researcher.", "Host scientist invitation letter, in the name of Faisal Ebbopoulos, dated 19 November 2025. 1 page, signed by the host scientist.", "Home institution endorsement letter, in the name of Faisal Ebbopoulos, dated 27 December 2025. 1 page, signed by the head of department."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 735}} {"id": "isc-te-00459-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Mersstead Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "14 August 2026"}, "checklist": ["Sales invoice or receipt for the sale proceeds, issued within the last 3 months", "Asset disposal request form, signed", "If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer, issued within the last 3 months", "Fixed asset register extract for the asset", "Depreciation schedule for the asset to date"], "submission": {"case": {"name": "disposed asset LV-4099", "reference": "IW-81554", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Depreciation schedule for the asset to date for disposed asset LV-4099. Date of issue: 16 May 2026. 2 pages, complete.", "Fixed asset register extract for the asset for disposed asset LV-4099. Date of issue: 3 June 2026. 1 page.", "Asset disposal request form for disposed asset LV-4099. Date of issue: 27 May 2026. 2 pages, complete. Signed by the budget holder.", "Part-exchange valuation from the dealer for disposed asset LV-4099. Date of issue: 22 June 2026. 1 page.", "Sales invoice or receipt for the sale proceeds for disposed asset LV-4099. Date of issue: 10 August 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 735}} {"id": "isc-te-00289-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Neskheim Ltd", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "2 June 2026"}, "checklist": ["Check that the course booking form is signed.", "Check that a prerequisite certificate is included.", "Check that the employer sponsorship letter was issued within the last 3 months and is signed.", "If the delegate requires an adjusted learning plan, also check that a learning support agreement is included and is signed.", "Check that a special requirements note is included.", "Check that the payment confirmation was issued within the last 3 months."], "submission": {"case": {"name": "course booking GA-88404", "reference": "DT-54396", "details": ["The delegate requires an adjusted learning plan."]}, "documents received": ["Course booking form GA-88404.pdf. The form is dated 27 April 2026 and covers course booking GA-88404. 2 pages, complete, and signed by the delegate.", "Prerequisite certificate GA-88404.pdf. The certificate is dated 21 February 2026 and relates to course booking GA-88404. Single page.", "Payment confirmation GA-88404.pdf. The confirmation is dated 29 March 2026 and refers to course booking GA-88404. Single page.", "Special requirements note GA-88404.pdf. The note is dated 13 February 2026 and concerns course booking GA-88404. Single page.", "Employer sponsorship letter GA-88404.pdf. The letter is dated 11 May 2026 and concerns course booking GA-88404. Single page, signed by the employer's HR manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 776}} {"id": "isc-te-00038-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Lunwyn Partners", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "8 April 2026"}, "checklist": ["Confirm the cure period expiry calculation is included, that it was issued within the last 1 months, and that it is signed.", "Confirm the termination notice draft is included and that it is signed.", "If the contract requires a dispute to go to mediation first, also: confirm the mediation request confirmation is included, that it was issued within the last 1 months, and that it is signed.", "Confirm the original service agreement copy is included.", "Confirm the breach evidence log is included, that it was issued within the last 1 months, and that it is signed."], "submission": {"case": {"name": "Tarvcombe & Co", "reference": "BI-47555", "details": ["The contract requires a dispute to go to mediation first."]}, "cover note": "Could you approve this one quickly? All the paperwork is in order.", "documents received": ["Original service agreement copy for Tarvcombe & Co, dated 24 December 2025, pages 1-9 of 10.", "Breach evidence log for Tarvcombe & Co, dated 23 March 2026, 6 pages, complete. Signed by the disputes case handler.", "Termination notice draft for Tarvcombe & Co, dated 25 January 2026, 2 pages, complete. Signed by the commercial director.", "Mediation request confirmation for Tarvcombe & Co, dated 23 March 2026, single page. Signed by the mediation case officer.", "Cure period expiry calculation for Tarvcombe & Co, dated 4 April 2026, 2 pages, complete. Signed by the contract manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 772}} {"id": "isc-te-00011-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ebrhurst BV", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "16 March 2026"}, "checklist": ["Credit bureau report issued within the last 1 months", "Bank statement issued within the last 3 months", "Signed sale and purchase agreement", "Employment certificate issued within the last 1 months and signed", "Property valuation report issued within the last 6 months and signed", "Photo identity document valid (not expired) on the date of the review"], "submission": {"case": {"name": "property JV-52110", "reference": "YG-70426"}, "documents received": ["credit_bureau_report_JV-52110.pdf — Credit bureau report for property JV-52110, dated 3 March 2026. 4 pages, complete.", "employment_certificate_JV-52110.pdf — Employment certificate for property JV-52110, dated 11 March 2026. Single page. Signed by the employer.", "bank_statement_JV-52110.pdf — Bank statement for property JV-52110, dated 17 February 2026. 3 pages, complete.", "student_card_with_photo_JV-52110.pdf — Student card with a photo for property JV-52110, expiring 19 March 2028. Single page.", "sale_and_purchase_agreement_JV-52110.pdf — Sale and purchase agreement for property JV-52110, dated 26 November 2025. Signed by the buyer and the seller. 9 pages, complete.", "property_valuation_report_JV-52110.pdf — Property valuation report for property JV-52110, dated 6 November 2025. Signed by the valuer. 10 pages, complete.", "mortgage_application_form_JV-52110.pdf — Mortgage application form for property JV-52110, dated 23 November 2025. Signed by the applicant. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide. Go through each checklist line that applies to this case. Only count a required document if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-64", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 859}} {"id": "isc-te-00459-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Mersstead Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "14 August 2026"}, "checklist": ["Sales invoice or receipt for the sale proceeds, issued within the last 3 months", "Asset disposal request form, signed", "If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer, issued within the last 3 months", "Fixed asset register extract for the asset", "Depreciation schedule for the asset to date"], "submission": {"case": {"name": "disposed asset LV-4099", "reference": "IW-81554", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Asset disposal request form for disposed asset LV-4099. Date of issue: 27 May 2026. 2 pages, complete. Signed by the budget holder.", "Board or budget holder approval for the disposal for disposed asset LV-4099. Date of issue: 8 August 2026. 1 page. Signed by the finance director.", "Depreciation schedule for the asset to date for disposed asset LV-4099. Date of issue: 16 May 2026. 2 pages, complete.", "Fixed asset register extract for the asset for disposed asset LV-4099. Date of issue: 3 June 2026. 1 page.", "Sales invoice or receipt for the sale proceeds for disposed asset LV-4099. Date of issue: 10 August 2026. 1 page.", "Written offer or valuation for the asset for disposed asset LV-4099. Date of issue: 5 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 778}} {"id": "isc-te-00363-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Baxfeld & Co", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "7 May 2026"}, "checklist": ["Firewall change request form, signed.", "Peer review checklist, issued within the last 1 month, signed.", "Proposed rule change specification, signed.", "Rollback plan, signed.", "If the change is planned during the year-end close period, also: freeze period exception approval, signed.", "Business justification memo, issued within the last 3 months, signed."], "submission": {"case": {"name": "firewall change CX-23740", "reference": "UB-55755", "details": ["The change is planned during the year-end close period."]}, "cover note": "Please approve this pack as soon as possible, as all the paperwork is in order.", "documents received": ["Rollback plan for firewall change CX-23740. Date of issue: 28 March 2026. 2 pages, complete. Signed by the change manager.", "Firewall change request form for firewall change CX-23740. Date of issue: 16 April 2026. 3 pages, complete. Signed by the requesting change manager.", "Risk assessment for firewall change CX-23740. Date of issue: 15 April 2026. 2 pages, complete. Signed by the information security officer.", "Freeze period exception approval for firewall change CX-23740. Date of issue: 18 March 2026. Single page. Signed by the head of the change advisory board.", "Proposed rule change specification for firewall change CX-23740. Date of issue: 7 February 2026. 2 pages, complete. Signed by the network engineer who prepared the specification.", "Business justification memo for firewall change CX-23740. Date of issue: 17 March 2026. Single page. The signature line is empty: the memo is not signed.", "Peer review checklist for firewall change CX-23740. Date of issue: 5 May 2026. Single page. Signed by the peer reviewer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 867}} {"id": "isc-te-00470-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Stervberg Ltd", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "9 March 2026"}, "checklist": ["Location details sheet", "Cost estimate issued within the last 3 months, signed", "Job request form, signed", "Parts order confirmation issued within the last 1 months", "Access authorisation slip, signed"], "submission": {"case": {"name": "maintenance request YF-33794", "reference": "GP-45887"}, "documents received": ["Location details sheet for maintenance request YF-33794, dated 23 January 2026. 1 page.", "Planned completion date sheet for maintenance request YF-33794, dated 29 January 2026. 1 page. Signed by the facilities coordinator.", "Job request form for maintenance request YF-33794, dated 16 February 2026. 1 page. Signed by the requesting manager.", "Access authorisation slip for maintenance request YF-33794, dated 16 February 2026. 1 page. Signed by the site security officer.", "Cost estimate for maintenance request YF-33794, dated 7 February 2026. 2 pages, complete. Signed by the estimating supervisor."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Review every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-71", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 684}} {"id": "isc-te-00152-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ilvstow GmbH", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "23 July 2026"}, "checklist": ["If the trip involves travel to a country requiring a visa, also: visa approval letter", "trip cost estimate (signed)", "If the traveller is not a passport holder of the destination country, also: work permit confirmation", "passport copy for international travel (valid (not expired) on the date of the review)", "hotel booking confirmation", "line manager approval (signed)"], "submission": {"case": {"name": "business trip JD-97425", "reference": "DE-41048", "details": ["The trip involves no country requiring a visa.", "The traveller is not a passport holder of the destination country."]}, "documents received": ["File: hotel booking confirmation JD-97425. A hotel booking confirmation for business trip JD-97425, dated 21 April 2026. 2 pages, complete.", "File: trip cost estimate JD-97425. A trip cost estimate for business trip JD-97425, dated 3 June 2026. It is 1 page and carries a signature from the line manager.", "File: passport copy JD-97425.pdf. A passport copy for international travel for business trip JD-97425, showing an expiry date of 1 August 2026. It is 1 page.", "File: work permit confirmation JD-97425. A work permit confirmation for business trip JD-97425, dated 21 June 2026. 2 pages, complete.", "File: visa entry requirement printout JD-97425. A visa entry requirement printout for business trip JD-97425, dated 5 May 2026. 2 pages, complete.", "File: passport copy JD-97425.pdf. A passport copy for international travel for business trip JD-97425, showing an expiry date of 23 May 2026. It is 1 page.", "File: scan_097425_09. The file will not open, so its contents cannot be seen.", "File: line manager approval JD-97425. A line manager approval for business trip JD-97425, dated 16 May 2026. It is 1 page and is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy, plus an unreadable extra file", "n_lines": 6, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 936}} {"id": "isc-te-00455-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Prydwood Inc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "28 July 2026"}, "checklist": ["Check that there is an outstanding advance clearance check, signed.", "Check that there is a travel advance request form, signed.", "Check that there is an employee bank detail confirmation, issued within the last 6 months and signed.", "Check that there is a travel policy extract showing advance eligibility."], "submission": {"case": {"name": "Lotte Mabaker", "reference": "WY-52421"}, "documents received": ["Employee bank detail confirmation for Lotte Mabaker, dated 17 July 2026. Single page, signed by the payroll officer.", "Payroll deduction agreement for recovery of the advance for Lotte Mabaker, dated 31 May 2026. Single page, signed by the payroll officer.", "Outstanding advance clearance check for Lotte Mabaker, dated 3 May 2026. Single page, signed by the accounts payable supervisor.", "Travel policy extract showing advance eligibility for Lotte Mabaker, dated 8 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 636}} {"id": "isc-te-00065-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Xanton LLP", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "29 June 2026"}, "checklist": ["Recent bank statements issued within the last 3 months.", "Capacity assessment record, signed.", "Benefit entitlement letters issued within the last 12 months.", "Support plan, signed."], "submission": {"case": {"name": "Jack Knoxaker", "reference": "YE-59569"}, "documents received": ["Bank statements. Recent bank statements for Jack Knoxaker, issued on 23 April 2026. 8 pages, complete.", "Support plan. Support plan for Jack Knoxaker, issued on 4 May 2026. 6 pages, complete. Signed by the lead social worker.", "Benefit entitlement letters. Benefit entitlement letters for Jack Knoxaker, issued on 27 October 2025. 2 pages, complete.", "Financial assessment form. Financial assessment form for Jack Knoxaker, issued on 16 May 2026. 6 pages, complete. Signed by the adult, Jack Knoxaker.", "Capacity assessment record. Capacity assessment record for Jack Knoxaker, issued on 1 March 2026. 4 pages, complete. Signed by the assessing social worker."]}}, "question": {"type": "choice", "instructions": "The decision required is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-67", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 671}} {"id": "isc-te-00386-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Orrston BV", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "18 May 2026"}, "checklist": ["Signed trial period proposal", "Line manager opinion note, signed and issued within the last 2 months", "Current working pattern statement issued within the last 3 months", "Previous flexible working requests record issued within the last 24 months", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed", "If the request is to work entirely from home, also: home working equipment checklist, signed"], "submission": {"case": {"name": "Daan Kerrridge", "reference": "XS-33835", "details": ["The employee has caring responsibilities for a dependent.", "The request is not to work entirely from home."]}, "cover note": "A colleague has already checked this pack, so I am passing it on for your review.", "documents received": ["Trial period proposal - Daan Kerrridge.pdf - Trial period proposal concerning Daan Kerrridge, dated 27 March 2026. It is 1 page and is signed by the line manager.", "Previous flexible working requests record - Hannah Radard.pdf - Previous flexible working requests record concerning Hannah Radard, dated 28 April 2026. It is 1 page.", "Caring responsibilities statement - Daan Kerrridge.pdf - Caring responsibilities statement concerning Daan Kerrridge, dated 8 May 2026. It is 1 page and is signed by Daan Kerrridge.", "Current working pattern statement - Daan Kerrridge.pdf - Current working pattern statement concerning Daan Kerrridge, dated 10 April 2026. It is 1 page.", "Line manager opinion note - Daan Kerrridge.pdf - Line manager opinion note concerning Daan Kerrridge, dated 10 May 2026. It is 2 pages, complete, and is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Go through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "variant-49", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 808}} {"id": "isc-te-00018-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silthorpe Group", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "15 April 2026"}, "checklist": ["Customer account details page, issued within the last 3 months", "Terms of sale acceptance log, issued within the last 12 months", "Customer order history extract, issued within the last 6 months", "Transaction record printout, issued within the last 3 months", "Fraud screening result sheet, issued within the last 3 months", "Chargeback response form, signed"], "submission": {"case": {"name": "disputed transaction NP-25742", "reference": "HU-11985"}, "documents received": ["Scanned terms of sale acceptance log for disputed transaction NP-25742, dated 29 March 2026. 1 page.", "Scanned chargeback response form for disputed transaction NP-25742, dated 9 April 2026. 2 pages, complete. Signed by the payments disputes team supervisor.", "Scanned signature proof of delivery for disputed transaction NP-25742, dated 10 November 2025. 1 page. Signed by the delivering courier.", "Scanned fraud screening result sheet for disputed transaction NP-25742, dated 9 April 2026. 1 page.", "Scanned customer account details page for disputed transaction NP-25742, dated 17 February 2026. 1 page.", "Scanned transaction record printout for disputed transaction NP-25742, dated 13 February 2026. 1 page.", "Scanned customer order history extract for disputed transaction NP-25742, dated 21 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 782}} {"id": "isc-te-00311-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Bravwald & Co", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "18 May 2026"}, "checklist": ["Obtain a racking inspection report issued within the last 12 months and signed.", "Obtain a utilities connection certificate.", "Obtain a signed floor load capacity report.", "If the warehouse site is in a flood risk area, also obtain a signed flood risk assessment.", "Obtain a fire safety certificate that is valid (not expired) on the date of the review.", "Obtain planning permission.", "Obtain an asbestos survey.", "If the warehouse stores food products, also obtain a food storage approval certificate that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "warehouse EG-76741", "reference": "PM-89902", "details": ["The warehouse site is not in a flood risk area.", "The warehouse stores no food products."]}, "documents received": ["Planning permission for warehouse EG-76741, issued on 27 January 2026. 2 pages, complete.", "Floor load capacity report for warehouse WC-51730, issued on 28 January 2026. 3 pages, complete. Signed by the structural engineer.", "Racking inspection report for warehouse EG-76741, issued on 26 October 2025. 2 pages, complete. Signed by the inspecting engineer.", "Fire safety certificate for warehouse EG-76741, with an expiry date of 23 February 2027. 2 pages, complete.", "Asbestos survey for warehouse EG-76741, issued on 26 March 2026. 5 pages, complete.", "Utilities connection certificate for warehouse EG-76741, issued on 25 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00294-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Ulmfield Inc", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "23 April 2026"}, "checklist": ["Check the location details sheet is present.", "Check the cost estimate is present, was issued within the last 3 months, and is signed.", "Check the job request form is present and is signed.", "Check the parts order confirmation is present and was issued within the last 1 months.", "If the job involves working at height above two metres, also check the permit to work at height is present, was issued within the last 1 months, and is signed.", "Check the access authorisation slip is present and is signed."], "submission": {"case": {"name": "maintenance request PZ-34030", "reference": "IX-99751", "details": ["The job involves working at height above two metres."]}, "documents received": ["A risk assessment for the task under maintenance request PZ-34030, dated 10 February 2026. It has 5 pages, complete. It is signed by the assessing supervisor.", "A single-page job request form for maintenance request PZ-34030, dated 2 January 2026. It is signed by the requesting department manager.", "A single-page access authorisation slip for maintenance request PZ-34030, dated 12 January 2026. It is signed by the site security manager.", "A single-page location details sheet for maintenance request PZ-34030, dated 17 April 2026.", "A cost estimate for maintenance request PZ-34030, dated 14 April 2026. It has 2 pages, complete. It is signed by the estimating manager.", "A single-page parts order confirmation for maintenance request PZ-34030, dated 10 April 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00246-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Glenmark Inc", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "13 July 2026"}, "checklist": ["Obtain proof of savings, issued within the last 2 months.", "Obtain recent bank statements, issued within the last 2 months.", "Obtain a benefit claim form that is valid (not expired) on the date of the review and signed.", "If the claimant has a non-dependant adult living in the household, also obtain a non-dependant income details form, signed.", "Obtain proof of national insurance number.", "Obtain proof of identity that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "Arjun Ingford", "reference": "TO-48296", "details": ["The claimant has a non-dependant adult living in the household."]}, "documents received": ["Proof of identity for Arjun Ingford. Expiry date: 24 July 2028. Single page.", "Proof of national insurance number for Arjun Ingford. Date of issue: 30 April 2026. Single page.", "Benefit claim form for Arjun Ingford. Expiry date: 22 September 2027. 12 pages, complete. Signed by the claimant.", "Lottery ticket kept as evidence of funds for Arjun Ingford. Date of issue: 31 May 2026. 2 pages, complete.", "File: scan_047.jpg. The scan is blank, so its contents cannot be seen.", "Current tenancy agreement for Arjun Ingford. Date of issue: 7 May 2026. 12 pages, complete. Signed by the landlord and the tenant.", "Proof of savings for Arjun Ingford. Date of issue: 31 May 2026. 2 pages, complete.", "Recent bank statements for Arjun Ingford. Date of issue: 20 June 2026. 12 pages, complete.", "Non-dependant income details form for Arjun Ingford. Date of issue: 29 June 2026. 2 pages, complete. Signed by the non-dependant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00166-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Oxlside Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "17 August 2026"}, "checklist": ["Confirm the pack contains the nominated store preference form, signed.", "Confirm the pack contains the customer contact details sheet, signed.", "Confirm the pack contains the loyalty scheme enrolment form, signed.", "Confirm the pack contains an identity verification document that is valid, that is not expired, on the date of the review, 17 August 2026.", "If the customer is transferring points from a rival scheme, also confirm the pack contains a points transfer evidence statement, issued within the last 3 months and signed."], "submission": {"case": {"name": "Rhys Elmcroft", "reference": "ZK-30863", "details": ["The customer is transferring points from a rival scheme."]}, "cover note": "This pack was already checked by a colleague before it reached me, so it should be straightforward to sign off. Thanks, Lena Wolmery.", "documents received": ["identity_verification_document_rhys_elmcroft.pdf: Identity verification document for Rhys Elmcroft, showing an expiry date of 12 May 2028. It is 1 page.", "loyalty_scheme_enrolment_form_rhys_elmcroft.pdf: Loyalty scheme enrolment form for Rhys Elmcroft, issued on 23 July 2026. It is 1 page and is signed by the customer.", "customer_contact_details_sheet_rhys_elmcroft.pdf: Customer contact details sheet for Rhys Elmcroft, issued on 22 April 2026. It is 1 page and is signed by the customer.", "points_transfer_evidence_statement_rhys_elmcroft.pdf: Points transfer evidence statement for Rhys Elmcroft, issued on 15 August 2026. It is 1 page and is signed by the issuing scheme's representative.", "store_locator_map_printout_rhys_elmcroft.pdf: Store locator map printout for Rhys Elmcroft, issued on 2 May 2026. It is 1 page and is signed by the customer.", "initial_points_balance_statement_rhys_elmcroft.pdf: Initial points balance statement for Rhys Elmcroft, issued on 22 July 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 914}} {"id": "isc-te-00203-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Marlfell Limited", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "22 May 2026"}, "checklist": ["If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Photographs of the fault, issued within the last 3 months.", "Access authorisation slip, signed.", "Location details sheet.", "Parts order confirmation, issued within the last 1 months.", "Job request form, signed.", "Cost estimate, issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request WG-2235", "reference": "JG-32987", "details": ["The job involves no work at height above two metres."]}, "documents received": ["Planned completion date sheet, maintenance request WG-2235. Date of issue: 26 March 2026. Single page. Signed by the facilities coordinator.", "Photographs of the fault, maintenance request WG-2235. Date of issue: 10 May 2026. Pages 1-1 of 2 are included; page 2 is not in the pack.", "Cost estimate, maintenance request WG-2235. Date of issue: 29 April 2026. 2 pages, complete. Signed by the estimating supervisor.", "Parts order confirmation, maintenance request WG-2235. Date of issue: 13 May 2026. Single page.", "Location details sheet, maintenance request WG-2235. Date of issue: 29 April 2026. Single page.", "Job request form, maintenance request WG-2235. Date of issue: 30 April 2026. Single page. Signed by the requesting manager.", "Access authorisation slip, maintenance request WG-2235. Date of issue: 1 May 2026. Single page. Signed by the site access controller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00089-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Fravwyn Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "16 July 2026"}, "checklist": ["Special requests note, signed", "Booking request form, signed", "Flight availability printout, issued within the last 1 months", "Passport details form, signed", "Travel insurance quote, issued within the last 1 months", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review", "Customer deposit receipt, issued within the last 3 months"], "submission": {"case": {"name": "holiday booking DO-39970", "reference": "NL-53165", "details": ["The booking includes a child traveller."]}, "documents received": ["Passport details form DO-39970. Issued 15 June 2026. 1 page, signed by the customer.", "Customer deposit receipt DO-39970. Issued 19 May 2026. 1 page.", "Package holiday brochure page DO-39970. Issued 29 March 2026. 1 page.", "Flight availability printout DO-39970. Issued 8 July 2026. 2 pages, complete.", "Booking request form DO-39970. Issued 23 April 2026. 2 pages, complete, signed by the customer.", "Special requests note DO-39970. Issued 17 June 2026. 1 page, signed by the customer.", "Travel insurance quote DO-39970. Issued 8 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 774}} {"id": "isc-te-00021-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Veybrook Group", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "18 March 2026"}, "checklist": ["Movers insurance certificate, valid (not expired) on the date of the review.", "Furniture inventory list, issued within the last 1 months, signed.", "New floor snagging list, issued within the last 1 months, signed.", "Lifting equipment inspection report, issued within the last 6 months, signed.", "Signed move plan, signed.", "Parking bay suspension approval, issued within the last 1 months, signed."], "submission": {"case": {"name": "office move project LO-48164", "reference": "TD-37447"}, "cover note": "Everything needed is attached and complete. Please review the pack ahead of the move.", "documents received": ["Parking bay suspension approval for office move project LO-48164. It shows its date of issue as 1 March 2026. It is a single page. It is signed by the highways officer.", "Movers insurance certificate for office move project LO-48164. It shows its expiry date as 7 October 2027. It is a single page.", "Lifting equipment inspection report for office move project LO-48164. It shows its date of issue as 13 January 2026. It is 2 pages, complete. It is signed by the lifting equipment inspector.", "Draft move plan with no approval signature for office move project LO-48164. It shows its date of issue as 22 February 2026. It is 6 pages, complete. It is signed by the move project manager.", "New floor snagging list for office move project LO-48164. It shows its date of issue as 14 March 2026. It is 3 pages, complete. It is signed by the site inspector.", "Furniture inventory list for office move project LO-48164. It shows its date of issue as 4 March 2026. It is 4 pages, complete. It is signed by the facilities coordinator."]}}, "question": {"type": "choice", "instructions": "Decide if the pack meets the checklist. Review each checklist line that applies to this case one by one. A required document only counts when it is the kind of document listed (not a similar one), is about the subject of the case, includes all its pages, is signed where the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-34", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 863}} {"id": "isc-te-00357-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zaldlock LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "10 August 2026"}, "checklist": ["Confirm the fuel policy sheet is present and signed.", "If the booking includes crossing a land border, also confirm the cross-border travel permission is present and signed.", "Confirm the passport is present, signed, and valid (not expired) on the date of the review.", "Confirm the insurance excess waiver certificate is present and valid (not expired) on the date of the review.", "Confirm the booking voucher is present and was issued within the last 6 months.", "Confirm the vehicle condition report is present and signed.", "Confirm the additional driver authorisation form is present and signed."], "submission": {"case": {"name": "Beatriz Plumworth", "reference": "WE-85422", "details": ["The booking stays within one country."]}, "documents received": ["Vehicle condition report. A report in the name of Beatriz Plumworth dated 30 July 2026, signed by the counter staff member who carried out the vehicle check. 2 pages, complete.", "Booking voucher. A single-page booking voucher in the name of Beatriz Plumworth showing a date of issue of 7 June 2026.", "Additional driver authorisation form. A single-page authorisation form in the name of Beatriz Plumworth dated 24 July 2026, signed by the named driver.", "Insurance excess waiver certificate. A certificate in the name of Beatriz Plumworth showing an expiry date of 22 August 2026. 2 pages, complete.", "Passport. A single-page passport in the name of Beatriz Plumworth showing an expiry date of 29 October 2028, signed by the passport holder.", "Fuel policy sheet. A single-page fuel policy sheet in the name of Beatriz Plumworth, dated 18 April 2026, signed by the named driver."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Go through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-49", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 814}} {"id": "isc-te-00030-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Orrburg Limited", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "12 June 2026"}, "checklist": ["Utility supplier's letter confirming the supply was cut off (issued within the last 12 months)", "Drying contractor's certificate of completion (issued within the last 6 months, signed)", "Flood claim form (signed)", "Only if this applies: 'The flood water reached the upper floor of the property': upper floor damage schedule (signed)", "Photographs of flood water in the rooms (issued within the last 1 months)"], "submission": {"case": {"name": "property AU-50577", "reference": "EO-64610", "details": ["The flood water stayed at ground floor level."]}, "documents received": ["AU-50577_photographs_of_flood_water_in_the_rooms.pdf. Photographs of flood water in the rooms of property AU-50577, dated 10 June 2026. 3 pages, complete.", "AU-50577_drying_contractors_certificate_of_completion.pdf. Drying contractor's certificate of completion for property AU-50577, dated 11 January 2026. 2 pages, complete. Signed by the drying contractor.", "AU-50577_flood_claim_form.pdf. Flood claim form for property AU-50577, dated 7 March 2026. 5 pages, complete. Signed by the policyholder.", "AU-50577_utility_suppliers_letter.pdf. Utility supplier's letter confirming the supply was cut off for property AU-50577, dated 21 August 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 771}} {"id": "isc-te-00397-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Ovarheim plc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "6 August 2026"}, "checklist": ["Energy performance certificate, valid (not expired) on the date of the review.", "Title information document.", "If the tenant is a newly formed company, also: signed parent company guarantee (signed).", "Keys handover receipt (signed).", "Asbestos survey report (issued within the last 12 months).", "Signed draft lease (signed).", "If the lease term is longer than seven years, also: land registration application (signed)."], "submission": {"case": {"name": "premises SZ-39951", "reference": "XS-67082", "details": ["Thetestant is an established company.", "The lease term is seven years or less."]}, "documents received": ["Keys handover receipt for premises SZ-39951. It shows a date of issue of 5 July 2026 and is signed by the landlord's agent. Single page.", "Energy performance certificate for premises SZ-39951. It shows an expiry date of 22 August 2026. Single page.", "Title information document for premises SZ-39951. It shows a date of issue of 8 July 2026. 3 pages, complete.", "Asbestos survey report for premises SZ-39951. It shows a date of issue of 27 December 2025. 4 pages, complete.", "Energy performance certificate for premises SZ-39951. It shows an expiry date of 6 February 2026. Single page.", "Signed draft lease for premises SZ-39951. It shows a date of issue of 30 May 2026 and is signed by the landlord and the tenant. 12 pages, complete.", "Stamp duty return for premises SZ-39951. It shows a date of issue of 18 April 2026 and is signed by the tenant's accountant. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 842}} {"id": "isc-te-00072-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Kenvgate Ltd", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "24 March 2026"}, "checklist": ["Equipment purchase request form, signed.", "Installation requirements note.", "Cost-benefit justification.", "If the equipment uses radioactive sources, also: radiation licence valid (not expired) on the date of the review.", "Training needs assessment, signed.", "Three quotes comparison sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "equipment US-49139", "reference": "LH-38443", "details": ["The equipment uses radioactive sources."]}, "documents received": ["Scanned three quotes comparison sheet for equipment US-49139, dated 18 December 2025, signed by the procurement officer. Single page.", "Scanned cost-benefit justification for equipment US-49139, dated 8 December 2025. 3 pages, complete.", "Scanned radiation licence for equipment US-49139, showing an expiry date of 29 January 2028. Single page.", "Scanned training needs assessment for equipment US-49139, dated 12 February 2026, signed by the training coordinator. Single page.", "Scanned equipment purchase request form for equipment US-49139, dated 23 January 2026, signed by the requesting department head. 2 pages, complete.", "Scanned installation requirements note for equipment US-49139, dated 7 December 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 742}} {"id": "isc-te-00405-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lunside Group", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "14 May 2026"}, "checklist": ["Previous audit findings closure file, signed.", "Open corrective action list, issued within the last 1 months, signed.", "Audit agenda, signed.", "Calibration status summary, issued within the last 1 months, signed."], "submission": {"case": {"name": "customer audit visit PB-63424", "reference": "XM-57442"}, "documents received": ["audit_agenda_PB-63424.pdf - Audit agenda for customer audit visit PB-63424. It shows a date of issue of 9 March 2026 and is signed by the quality management office manager. Single page.", "previous_audit_findings_closure_file_PB-63424.pdf - Previous audit findings closure file for customer audit visit PB-63424. It shows a date of issue of 3 February 2026 and is signed by the quality management office manager. 6 pages, complete.", "document_control_list_PB-63424.pdf - Document control list for customer audit visit PB-63424. It shows a date of issue of 9 March 2026 and is signed by the quality management office manager. 4 pages, complete.", "open_corrective_action_list_PB-63424.pdf - Open corrective action list for customer audit visit PB-63424. It shows a date of issue of 5 May 2026 and is signed by the quality management office manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must judge whether the pack is complete with respect to the checklist. Step through each checklist line that applies to this case. Only count a required document if it is the kind of document listed (not a similar one), if it is about the subject of the case, if it has all its pages, if it is signed where the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer with complete: every applicable line is met (extra documents do not matter). Answer with incomplete: at least one applicable line is not met. Answer with unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-22", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 768}} {"id": "isc-te-00389-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Mersstow Partners", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "3 July 2026"}, "checklist": ["Trial period proposal, signed.", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed.", "Impact assessment on the team, signed.", "Flexible working request form, signed.", "Proposed working pattern plan, signed.", "Client or service impact statement, signed."], "submission": {"case": {"name": "Elif Arnstad", "reference": "VD-24090"}, "documents received": ["Caring responsibilities statement - Elif Arnstad - 25 March 2026.pdf. Caring responsibilities statement concerning Elif Arnstad, dated 25 March 2026. It is 1 page and is signed by the employee.", "Flexible working request form - Elif Arnstad - 24 March 2026.pdf. Flexible working request form concerning Elif Arnstad, dated 24 March 2026. It is 3 pages, complete, and is signed by the employee.", "Trial period proposal - Elif Arnstad - 19 March 2026.pdf. Trial period proposal concerning Elif Arnstad, dated 19 March 2026. It is 1 page and is signed by the line manager.", "Impact assessment on the team - Elif Arnstad - 1 May 2026.pdf. Impact assessment on the team concerning Elif Arnstad, dated 1 May 2026. It is 3 pages, complete, and is signed by the line manager.", "Client or service impact statement - Elif Arnstad - 14 June 2026.pdf. Client or service impact statement concerning Elif Arnstad, dated 14 June 2026. It is 1 page and is signed by the service lead.", "Current working pattern statement - Elif Arnstad - 4 June 2026.pdf. Current working pattern statement concerning Elif Arnstad, dated 4 June 2026. It is 1 page.", "Proposed working pattern plan - Elif Arnstad - 17 May 2026.pdf. Proposed working pattern plan concerning Elif Arnstad, dated 17 May 2026. It is 2 pages, complete, and is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "You must judge if the pack is complete relative to the checklist. Review each line of the checklist that has relevance to this case. To count, a required document must match the kind of document the checklist specifies (a similar one will not do), must relate to the subject of the case, must include all its pages, must be signed wherever the checklist calls for a signature, must still be valid on the review date (that is, not expired), and must have been issued during the period the checklist permits. A conditional line binds the case only if the circumstance it describes actually holds. complete: all applicable lines are satisfied, and extra documents are of no consequence. incomplete: at least one applicable line fails. unclear: no line fails outright, but at least one cannot be decided on the basis of what is displayed, for example a necessary date, signature or page count is not visible, the kind of a document cannot be told, or the case details are silent on whether a conditional line's circumstance holds while that line's document is missing. Do not rely on cover notes or labels, which may mislead; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-52", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 933}} {"id": "isc-te-00460-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Cindhaven Limited", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "17 September 2026"}, "checklist": ["Check that a signed board resolution to open the account is included.", "Check that the certificate of incorporation is included.", "Check that proof of registered office address is included, issued within the last 3 months.", "Check that the signed company statutes are included.", "Check that a shareholder register extract is included, issued within the last 3 months.", "Check that the company tax registration certificate is included.", "If the company has a non-resident beneficial owner, also check that the apostilled incorporation documents are included."], "submission": {"case": {"name": "Urvlund Partners", "reference": "YW-82009", "details": ["The company has a non-resident beneficial owner."]}, "cover note": "Please accept my apologies for this pack, as it was put together in a rush.", "documents received": ["Scanned proof of registered office address for Urvlund Partners, dated 8 July 2026. Single page.", "Scanned board resolution to open the account for Urvlund Partners, dated 21 May 2026. Single page, signed by the chair of the board.", "Scanned apostilled incorporation documents for Urvlund Partners, dated 7 July 2026. 4 pages, complete.", "Scanned company statutes for Urvlund Partners, dated 1 August 2026. 12 pages, complete, signed by the secretary.", "File named doc_001.pdf; the scan is blank and nothing in it can be seen.", "Scanned authorised signer identity document for Urvlund Partners, expiring 21 April 2028. Single page.", "Scanned company tax registration certificate for Urvlund Partners, dated 9 August 2026. Single page.", "Scanned certificate of incorporation for Urvlund Partners, dated 15 August 2026. Single page.", "Scanned shareholder register extract for Urvlund Partners, dated 17 August 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 848}} {"id": "isc-te-00487-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Heskness & Co", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "11 August 2026"}, "checklist": ["If the tenant is a newly formed company, also include: signed parent company guarantee (signed)", "If the lease term is longer than seven years, also include: land registration application (signed)", "Check that the keys handover receipt is signed", "Check that the title information document is present", "Check that the signed draft lease is signed", "Check that the stamp duty return is signed", "Check that the asbestos survey report was issued within the last 12 months"], "submission": {"case": {"name": "premises PF-67086", "reference": "NG-35657", "details": ["The tenant is a newly formed company.", "The lease term is longer than seven years."]}, "cover note": "Please accept my apologies for the pack being put together in a rush.", "documents received": ["Stamp_Duty_Return_PF-67086.pdf - Stamp duty return for premises PF-67086, dated 15 April 2026. 2 pages, complete. Signed by the tenant's accountant.", "Asbestos_Survey_Report_PF-67086_20250822.pdf - Asbestos survey report for premises PF-67086, issued on 22 August 2025. 4 pages, complete.", "Title_Information_Document_PF-67086.pdf - Title information document for premises PF-67086, dated 11 June 2026. 3 pages, complete.", "Signed_Draft_Lease_PF-67086.pdf - Signed draft lease for premises PF-67086, dated 10 June 2026. 12 pages, complete. Signed by the landlord and the tenant.", "Keys_Handover_Receipt_PF-67086.pdf - Keys handover receipt for premises PF-67086, dated 12 June 2026. Single page. Signed by the landlord's agent.", "Parent_Company_Guarantee_PF-67086.pdf - Signed parent company guarantee for premises PF-67086, dated 8 June 2026. 3 pages, complete. Signed by a director of the parent company.", "Land_Registration_Application_PF-67086.pdf - Land registration application for premises PF-67086, dated 17 June 2026. 2 pages, complete. Signed by the applicant's solicitor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 958}} {"id": "isc-te-00033-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Wendstead Limited", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "23 June 2026"}, "checklist": ["Loss adjuster's inspection report, issued within the last 6 months and signed", "Council flood warning notice, issued within the last 12 months", "Flood claim form, signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months"], "submission": {"case": {"name": "property SP-19466", "reference": "IK-48540"}, "documents received": ["utility_supplier_letter_SP-19466.pdf - Utility supplier's letter confirming the supply was cut off at property SP-19466, dated 18 January 2026. Single page.", "loss_adjuster_inspection_report_SP-19466.pdf - Loss adjuster's inspection report for property SP-19466, dated 16 January 2026. 6 pages, complete. Signed by the loss adjuster.", "council_flood_warning_notice_SP-19466.pdf - Council flood warning notice for property SP-19466, dated 7 November 2025. Single page.", "flood_claim_form_SP-19466_partial.pdf - Flood claim form for property SP-19466, dated 4 June 2026. 5 pages, complete. A sticky note covers the signature block, so it cannot be seen whether the form is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 725}} {"id": "isc-te-00297-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Kaldlock BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "21 July 2026"}, "checklist": ["Written grievance statement, signed", "Witness list, signed", "Adjustment request record, issued within the last 3 months, signed", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed", "Evidence bundle index, signed", "Grievance procedure acknowledgement, issued within the last 3 months, signed"], "submission": {"case": {"name": "Hannah Kerrmore", "reference": "SB-29513", "details": ["The grievance is against the employee's direct manager."]}, "documents received": ["Grievance procedure acknowledgement about Hannah Kerrmore. The date is smudged and cannot be read. Single page. Signed by the complaining employee, Hannah Kerrmore.", "Previous grievance outcome letter about Hannah Kerrmore. Dated 2 August 2024. 2 pages, complete.", "Written grievance statement about Hannah Kerrmore. Dated 26 April 2026. 3 pages, complete. Signed by the complaining employee, Hannah Kerrmore.", "Witness list about Hannah Kerrmore. Dated 21 April 2026. Single page. Signed by the complaining employee, Hannah Kerrmore.", "Evidence bundle index about Hannah Kerrmore. Dated 9 July 2026. 2 pages, complete. Signed by the HR case handler.", "Adjustment request record about Hannah Kerrmore. Dated 6 July 2026. Single page. Signed by the HR case handler.", "Alternative manager reporting line note about Hannah Kerrmore. Dated 16 May 2026. Single page. Signed by the HR case handler."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 775}} {"id": "isc-te-00465-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Zalddale Group", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "13 July 2026"}, "checklist": ["Prerequisite certificate included", "If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "Employer sponsorship letter included (issued within the last 3 months, signed)", "Course booking form included (signed)", "Payment confirmation included (issued within the last 3 months)", "If the delegate requires an adjusted learning plan, also: learning support agreement (signed)"], "submission": {"case": {"name": "course booking BS-25601", "reference": "KW-27021", "details": ["The course leads to a licensed qualification.", "The delegate requires an adjusted learning plan."]}, "documents received": ["payment_confirmation_BS-25601.pdf. A single-page payment confirmation for course booking BS-25601, issued on 3 May 2026.", "licence_eligibility_declaration_BS-25601.pdf. A single-page licence eligibility declaration for course booking BS-25601, issued on 21 June 2026, signed by the delegate.", "prerequisite_certificate_BS-25601.pdf. A single-page prerequisite certificate for course booking BS-25601, issued on 26 March 2026.", "learning_support_agreement_BS-25601.pdf. A single-page learning support agreement for course booking BS-25601, issued on 19 March 2026, signed by the course tutor.", "course_booking_form_BS-25601.pdf. A course booking form for course booking BS-25601, issued on 3 April 2026. 2 pages, complete, signed by the delegate.", "employer_sponsorship_letter_BS-25601.pdf. A single-page employer sponsorship letter for course booking BS-25601, issued on 25 April 2026, signed by the employer's authorised signatory."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack fulfils the checklist. Examine every checklist line that applies to this case. For a required document to count, it must be the kind listed (not a similar kind), be about the case's subject, have all its pages, be signed wherever the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line fails. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-11", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 837}} {"id": "isc-te-00334-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Larvby Inc", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "5 June 2026"}, "checklist": ["Signed copy of the general terms and conditions, with the supplier's signature in place.", "Certificate of incorporation.", "Company tax clearance certificate, valid and not expired on the date of the review.", "Supplier declaration of no conflicts of interest, with the supplier's signature in place.", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid and not expired on the date of the review.", "Supplier registration form, with the supplier's signature in place.", "Bank details confirmation letter, issued within the last 3 months and with the supplier's signature in place."], "submission": {"case": {"name": "Marlcourt LLP", "reference": "BT-69198", "details": ["The supplier is not a small business with a single owner."]}, "documents received": ["Certificate of incorporation for Marlcourt LLP, dated 9 February 2026. 2 pages, complete.", "Supplier registration form for Marlcourt LLP, dated 1 March 2026. The form is signed by a partner of Marlcourt LLP. 3 pages, complete.", "Bank details confirmation letter for Marlcourt LLP, dated 23 April 2026. The letter is signed by a partner of Marlcourt LLP. Single page.", "Supplier declaration of no conflicts of interest for Marlcourt LLP, dated 23 May 2026. The declaration is signed by a partner of Marlcourt LLP. Single page.", "Company tax clearance certificate for Marlcourt LLP, with an expiry date of 24 March 2028. Single page.", "Certificate of insurance for Marlcourt LLP, with an expiry date of 24 April 2028. 2 pages, complete.", "Signed copy of the general terms and conditions for Marlcourt LLP, dated 18 February 2026. The document is signed by a partner of Marlcourt LLP. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00378-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Raskgate GmbH", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "1 July 2026"}, "checklist": ["Check that the pack contains a fraud screening result sheet issued within the last 3 months.", "Check that the pack contains a terms of sale acceptance log issued within the last 12 months.", "If the customer claims the item was not as described, also check that the pack contains a product description screenshot archive issued within the last 6 months.", "Check that the pack contains a customer order history extract issued within the last 6 months.", "Check that the pack contains a transaction record printout issued within the last 3 months.", "Check that the pack contains a signature proof of delivery issued within the last 6 months and signed.", "Check that the pack contains a chargeback response form signed."], "submission": {"case": {"name": "disputed transaction VF-44059", "reference": "UL-78187", "details": ["The customer claims the item was not as described."]}, "documents received": ["Transaction record printout for disputed transaction VF-44059, dated 20 June 2026. Scanned document, 1 page.", "Signature proof of delivery for disputed transaction VF-44059, dated 24 February 2026. The signature line is empty, so it is not signed. Scanned document, 1 page.", "Product description screenshot archive for disputed transaction VF-44059, dated 12 April 2026. 2 pages, complete.", "Customer order history extract for disputed transaction VF-44059, dated 25 April 2026. 2 pages, complete.", "Chargeback response form for disputed transaction VF-44059, dated 15 June 2026, signed by the payments disputes team lead. 2 pages, complete.", "Terms of sale acceptance log for disputed transaction VF-44059, dated 11 August 2025. Scanned document, 1 page.", "Customer account details page for disputed transaction VF-44059, dated 9 June 2026. Scanned document, 1 page.", "Fraud screening result sheet for disputed transaction VF-44059, dated 28 June 2026. Scanned document, 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 905}} {"id": "isc-te-00293-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Glenford GmbH", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "14 April 2026"}, "checklist": ["If the job involves working at height above 2 metres, also: permit to work at height (issued within the last 1 months, signed)", "If the job will take place in an occupied office, also: occupier notification letter (issued within the last 1 months, signed)", "access authorisation slip (signed)", "cost estimate (issued within the last 3 months, signed)", "location details sheet", "photographs of the fault (issued within the last 3 months)"], "submission": {"case": {"name": "maintenance request JO-3858", "reference": "WB-64559", "details": ["The job involves working at height above two metres.", "The job will take place in an occupied office."]}, "documents received": ["Occupier notification letter. The letter concerns maintenance request JO-3858 and shows its date of issue as 6 April 2026. It is 1 page and is signed by the facilities coordinator.", "Photographs of the fault. The photographs relate to maintenance request JO-3858 and show their date of issue as 25 March 2026. It is 2 pages, complete.", "Permit to work at height. The permit relates to maintenance request JO-3858 and shows its date of issue as 2 April 2026. It is 1 page and carries the signature of the authorising manager.", "File 14-04-A.pdf. The file will not open, so its contents cannot be seen.", "Access authorisation slip. The slip relates to maintenance request JO-3858 and shows its date of issue as 2 January 2026. It is 1 page and carries the signature of the site access controller.", "Location details sheet. The sheet covers maintenance request JO-3858 and shows its date of issue as 5 February 2026. It is 1 page.", "Cost estimate. The estimate is for maintenance request JO-3858 and shows its date of issue as 29 January 2026. It is 2 pages, complete, and is signed by the estimating surveyor."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 694}} {"id": "isc-te-00308-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Mersvik Inc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "10 March 2026"}, "checklist": ["Confirm the pack includes the guarantor consent letter, signed", "Confirm the pack includes the energy performance certificate, valid (not expired) on the date of the review", "Confirm the pack includes the stamp duty return, signed", "Confirm the pack includes the signed draft lease, signed"], "submission": {"case": {"name": "premises KB-78902", "reference": "VA-57606"}, "documents received": ["Energy Performance Certificate for premises KB-78902, reference VA-57606, showing an expiry date of 26 June 2026. It is 1 page.", "Stamp Duty Return for premises KB-78902, reference VA-57606, dated 16 January 2026. It is 2 pages, complete. A sticky note covers the signature block, so it is not known whether it is signed.", "Guarantor Consent Letter, dated 23 December 2025, for premises KB-78902, reference VA-57606. It is 1 page and carries the guarantor's signature.", "Signed Draft Lease for premises KB-78902, reference VA-57606, dated 17 December 2025. It is 12 pages, complete, and is signed by both the landlord and the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 719}} {"id": "isc-te-00296-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Corvwald GmbH", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "2 April 2026"}, "checklist": ["Statutory holiday entitlement confirmation is enclosed.", "Signed handover note is enclosed.", "Team holiday planner extract is enclosed.", "Manager approval email is enclosed, issued within the last 2 months.", "Leave balance statement is enclosed, issued within the last 3 months."], "submission": {"case": {"name": "Kayla Ostcombe", "reference": "KW-71803"}, "documents received": ["Leave balance statement for Kayla Ostcombe, dated 20 January 2026. 1 page.", "Handover note for Kayla Ostcombe, dated 9 February 2026. 2 pages, complete. Signed by the line manager.", "Team holiday planner extract for Kayla Ostcombe, dated 11 December 2025. 2 pages, complete.", "Statutory holiday entitlement confirmation for Kayla Ostcombe, dated 16 January 2026. 1 page.", "Return to work date confirmation for Kayla Ostcombe, dated 21 March 2026. 1 page.", "Manager approval email for Kayla Ostcombe, dated 16 February 2026. 1 page.", "Job description with no handover information for Kayla Ostcombe, dated 9 February 2026. 2 pages, complete. Signed by the HR manager."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; base your judgement on the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-42", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 709}} {"id": "isc-te-00385-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Cindlund SAS", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "14 May 2026"}, "checklist": ["Flexible working request form, signed", "Trial period proposal, signed", "Line manager opinion note, signed, issued within the last 2 months", "Proposed working pattern plan, signed", "Impact assessment on the team, signed"], "submission": {"case": {"name": "Michael Pimisey", "reference": "TK-36304"}, "documents received": ["Flexible working request form for Michael Pimisey, dated 22 April 2026, 3 pages, complete, signed by the employee.", "Proposed working pattern plan for Michael Pimisey, dated 27 March 2026, 2 pages, complete, signed by the employee.", "Line manager opinion note for Michael Pimisey, dated 10 May 2026, 2 pages, complete, signed by the line manager.", "Trial period proposal for Michael Pimisey, dated 17 February 2026, 1 page, signed by the line manager.", "Current working pattern statement for Michael Pimisey, dated 9 May 2026, 1 page.", "Impact assessment on the team for Michael Pimisey, dated 1 February 2026, 3 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 694}} {"id": "isc-te-00187-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Baxwyn Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "27 July 2026"}, "checklist": ["If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer (issued within the last 3 months)", "depreciation schedule for the asset to date", "sales invoice or receipt for the sale proceeds (issued within the last 3 months)", "profit or loss on disposal calculation (signed)", "board or budget holder approval for the disposal (signed)"], "submission": {"case": {"name": "disposed asset NB-8361", "reference": "QR-52405", "details": ["The asset is a company car being part-exchanged."]}, "documents received": ["Sales invoice or receipt for the sale proceeds, dated 13 May 2026, for disposed asset NB-8361. 1 page.", "Depreciation schedule for the asset to date, dated 5 June 2026, for disposed asset NB-8361. 2 pages, complete.", "Sales invoice or receipt for the sale proceeds, dated 12 January 2025, for disposed asset NB-8361. 1 page.", "Profit or loss on disposal calculation, dated 20 July 2026, for disposed asset NB-8361. 1 page. It is signed by the group financial controller.", "Part-exchange valuation from the dealer, dated 29 May 2026, for disposed asset NB-8361. 1 page.", "Board or budget holder approval for the disposal, dated 5 April 2026, for disposed asset NB-8361. 1 page. It is signed by the budget holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 777}} {"id": "isc-te-00131-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Caelheim GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "14 May 2026"}, "checklist": ["Check that the pack contains a utilities connection certificate.", "Check that the pack contains a signed lease agreement.", "Check that the pack contains a floor load capacity report that is signed.", "Check that the pack contains a warehouse insurance policy that is still valid, not expired, on 14 May 2026.", "Check that the pack contains a fire safety certificate that is still valid, not expired, on 14 May 2026."], "submission": {"case": {"name": "warehouse PV-88477", "reference": "EJ-39928"}, "cover note": "Please accept my apologies for this pack, as it was put together in a rush. I hope it reaches you in good time.", "documents received": ["Warehouse insurance policy.pdf. This is the warehouse insurance policy for warehouse PV-88477, with an expiry date of 5 October 2027, 6 pages, complete.", "Floor load capacity report.pdf. This is the floor load capacity report for warehouse PV-88477, issued on 21 January 2026, 3 pages, complete. It is signed by the structural engineer.", "Fire safety certificate.pdf. This is the fire safety certificate for warehouse PV-88477, with an expiry date of 25 August 2028, 2 pages, complete.", "Asbestos survey.pdf. This is the asbestos survey for warehouse PV-88477, issued on 5 April 2026, 5 pages, complete.", "Racking inspection report.pdf. This is the racking inspection report for warehouse PV-88477, issued on 18 November 2025, 2 pages, complete. It is signed by the inspector.", "Utilities connection certificate.pdf. This is the utilities connection certificate for warehouse PV-88477, issued on 18 April 2026, 1 page.", "Lease agreement.pdf. This is the signed lease agreement for warehouse PV-88477, issued on 1 March 2026, 8 pages, complete. It is signed by the landlord.", "Office utility bill.pdf. This is a utility bill for the site's office at warehouse PV-88477, issued on 18 April 2026, 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 928}} {"id": "isc-te-00194-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Tarvston Limited", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "16 September 2026"}, "checklist": ["Signature verification record: confirm it is present and signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form: confirm it is present and signed", "Photo identification: confirm it is valid (not expired) on the date of the review", "Delivery address confirmation: confirm it is present and signed", "Card replacement request form: confirm it is present and signed", "Fraud questionnaire: confirm it is present and signed", "Account statement showing recent activity: confirm it was issued within the last 1 months"], "submission": {"case": {"name": "Daan Jessova", "reference": "KM-50187", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["fraud_questionnaire.pdf - Card replacement fraud questionnaire for Daan Jessova, dated 10 August 2026. 2 pages, complete. Signed by the cardholder.", "account_statement_recent_activity.pdf - Account statement showing recent activity for Daan Jessova, dated 1 September 2026. 3 pages, complete.", "photo_identification.pdf - Photo identification for Daan Jessova, showing an expiry date of 25 April 2028. 1 page.", "card_replacement_request_form.pdf - Card replacement request form for Daan Jessova, dated 11 July 2026. 2 pages, complete. Signed by the cardholder.", "signature_verification_record.pdf - Signature verification record for Daan Jessova, dated 18 August 2026. 1 page. Signed by a card services officer.", "delivery_address_confirmation.pdf - Delivery address confirmation for Daan Jessova, dated 8 June 2026. 1 page. Signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00303-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Fravfell Partners", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "22 April 2026"}, "checklist": ["Staff training record for the duty manager, issued within the last 24 months and signed", "CCTV footage stills of the incident, issued within the last 3 months", "Incident report from the day, issued within the last 3 months and signed", "Cleaning log for the day of the incident, issued within the last 6 months and signed", "Witness statement from a staff member, signed"], "submission": {"case": {"name": "Dornmere LLP", "reference": "YX-91405"}, "cover note": "A colleague has already checked this pack before sending it on to you.", "documents received": ["Cleaning log for the day of the incident, Dornmere LLP, dated 24 January 2026. 1 page. A sticky note covers the signature block, so it cannot be seen whether the log is signed.", "Witness statement from a staff member, Dornmere LLP, dated 11 April 2026. 1 page. Signed by the staff member who wrote it.", "Incident report from the day, Dornmere LLP, dated 11 February 2026. 2 pages, complete. Signed by the duty manager.", "Staff training record for the duty manager, Dornmere LLP, dated 2 May 2025. 2 pages, complete. Signed by the duty manager.", "CCTV footage stills of the incident, Dornmere LLP, dated 23 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00207-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Crancombe Inc", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "4 August 2026"}, "checklist": ["Leave balance statement, issued within the last 3 months", "If the leave requested is longer than two weeks, also: extended absence cover plan (signed)", "Handover note (signed)", "Team holiday planner extract", "Contact plan for time away", "Return to work date confirmation", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave (signed)"], "submission": {"case": {"name": "Femke Grubwick", "reference": "MF-51224", "details": ["The leave requested is longer than two weeks.", "The employee is requesting leave during a known busy period."]}, "documents received": ["contact_plan_for_time_away_MF-51224.pdf. Contact plan for time away for Femke Grubwick, dated 27 June 2026. 1 page.", "business_case_for_peak_period_leave_MF-51224.pdf. Business case for peak-period leave for Femke Grubwick, dated 13 May 2026. 2 pages, complete; signed by the line manager.", "handover_note_MF-51224.pdf. Handover note for Femke Grubwick, dated 23 July 2026. 2 pages, complete; signed by the line manager.", "team_holiday_planner_extract_MF-51224.pdf. Team holiday planner extract for Femke Grubwick, dated 8 June 2026. 2 pages, complete.", "leave_balance_statement_MF-51224_v4.pdf. Leave balance statement for Femke Grubwick; the date of issue is smudged and cannot be read. 1 page.", "extended_absence_cover_plan_MF-51224.pdf. Extended absence cover plan for Femke Grubwick, dated 16 July 2026. 3 pages, complete; signed by the line manager.", "return_to_work_date_confirmation_MF-51224.pdf. Return to work date confirmation for Femke Grubwick, dated 4 May 2026. 1 page.", "manager_approval_email_MF-51224.pdf. Manager approval email for Femke Grubwick, dated 23 June 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 922}} {"id": "isc-te-00161-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Kenvcliff & Co", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "17 June 2026"}, "checklist": ["Financial expenditure summary, issued within the last 3 months and signed.", "Annual activity report, issued within the last 6 months and signed.", "If the institute received industry funding above the university's disclosure threshold, also: industry funding disclosure statement, issued within the last 12 months and signed.", "Staffing plan, issued within the last 6 months and signed.", "External advisory board minutes, issued within the last 12 months and signed.", "Director's declaration of interests, issued within the last 12 months and signed."], "submission": {"case": {"name": "Iskmoor & Co", "reference": "YW-63386", "details": ["The institute received industry funding above the university's disclosure threshold."]}, "cover note": "Could you approve this pack quickly? Everything in it is in order, so a fast sign-off would be a great help.", "documents received": ["External advisory board minutes for Iskmoor & Co, dated 19 December 2025. 4 pages, complete. Signed by the chair of the external advisory board.", "Annual activity report for Iskmoor & Co, dated 26 February 2026. 12 pages, complete. Signed by the institute director.", "Organisational chart for Iskmoor & Co, dated 10 March 2026, showing the structure from three years ago. 2 pages, complete. Signed by the institute director.", "Publications list for Iskmoor & Co, dated 28 January 2026. 4 pages, complete.", "Industry funding disclosure statement for Iskmoor & Co, dated 22 March 2026. A single page. Signed by the institute director.", "Director's declaration of interests for Iskmoor & Co, dated 14 May 2026. A single page. Signed by the institute director.", "Financial expenditure summary for Iskmoor & Co, dated 11 May 2026. 3 pages, complete. Signed by the institute finance officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 865}} {"id": "isc-te-00162-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Stromhurst Inc", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "22 June 2026"}, "checklist": ["Photo identity document, valid (not expired) on the date of the review", "Experiment safety clearance form, signed", "If the researcher will bring their own samples, also: Sample import declaration for facility, signed", "Radiation safety training certificate, issued within the last 24 months, signed", "Host scientist invitation letter, issued within the last 6 months, signed", "Facility access application form, signed"], "submission": {"case": {"name": "Siobhan Nebbaker", "reference": "YX-47968", "details": ["The researcher will bring their own samples."]}, "documents received": ["Facility access application form for Siobhan Nebbaker. Date of issue: 27 March 2026. 2 pages, complete. Signed by the visiting researcher.", "Host scientist invitation letter for Siobhan Nebbaker. Date of issue: 26 April 2026. Single page. Signed by the host scientist.", "Radiation safety training certificate for Siobhan Nebbaker. Date of issue: 21 October 2025. Single page. Signed by the radiation safety training coordinator.", "Photo identity document for Siobhan Nebbaker. The expiry date is smudged and cannot be read. Single page.", "Experiment safety clearance form for Siobhan Nebbaker. Date of issue: 10 March 2026. 3 pages, complete. Signed by the facility safety officer.", "Sample import declaration for facility for Siobhan Nebbaker. Date of issue: 16 May 2026. 2 pages, complete. Signed by the visiting researcher."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist. Work through every checklist line that applies to this case. Only a document that is the kind listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows counts as satisfying a required document. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-48", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00345-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Quorwald Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 March 2026"}, "checklist": ["Marketing consent form, signed, on file.", "Identity verification document, valid (not expired) on the date of the review, on file.", "Loyalty scheme enrolment form, signed, on file.", "If the customer is joining as a household account with a shared card, also: household member details form, signed, on file.", "Customer contact details sheet, signed, on file.", "Points transfer request, signed, on file.", "Terms and conditions acceptance sheet, signed, on file.", "If the customer is transferring points from a rival scheme, also: points transfer evidence statement, issued within the last 3 months and signed, on file."], "submission": {"case": {"name": "Siobhan Zellson", "reference": "RV-67522", "details": ["The customer is joining as a single-person account.", "The customer is transferring points from a rival scheme."]}, "documents received": ["Customer contact details sheet for Siobhan Zellson. It shows a date of issue of 29 December 2025 and is signed by Siobhan Zellson. It is a single page.", "Nominated store preference form for Siobhan Zellson. It shows a date of issue of 6 December 2025 and is signed by Siobhan Zellson. It is a single page.", "Terms and conditions acceptance sheet for Siobhan Zellson. It shows a date of issue of 4 January 2026 and is signed by Siobhan Zellson. It is a single page.", "Points transfer evidence statement for Siobhan Zellson. It shows a date of issue of 4 March 2026 and is signed by Siobhan Zellson. It is a single page.", "Points transfer request for Siobhan Zellson. It shows a date of issue of 19 February 2026 and is signed by Siobhan Zellson. It is a single page.", "Loyalty scheme enrolment form for Siobhan Zellson. It shows a date of issue of 11 January 2026 and is signed by Siobhan Zellson. It is a single page.", "Identity verification document for Siobhan Zellson. It shows an expiry date of 17 April 2027. It is a single page."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 918}} {"id": "isc-te-00190-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ovarcourt GmbH", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "20 March 2026"}, "checklist": ["Mortgage application form, signed", "Sale and purchase agreement, signed", "Proof of deposit issued within the last 3 months", "Photo identity document valid (not expired) on the date of the review", "Credit bureau report issued within the last 1 months", "Employment certificate issued within the last 1 months, signed"], "submission": {"case": {"name": "property YQ-74246", "reference": "EC-84723"}, "cover note": "This pack was already checked by a colleague. Kind regards, Carmen Rookisey", "documents received": ["employment-certificate-YQ-74246.pdf — Employment certificate for property YQ-74246. It shows a date of issue of 14 March 2026. It is 1 page and is signed by the employer.", "proof-of-deposit-YQ-74246.pdf — Proof of deposit for property YQ-74246. It shows a date of issue of 8 January 2026. It is 1 page.", "bank-statement-YQ-74246.pdf — Bank statement for property YQ-74246. It shows a date of issue of 3 February 2026. It is 3 pages, complete.", "sale-and-purchase-agreement-YQ-74246.pdf — Sale and purchase agreement for property YQ-74246. It shows a date of issue of 6 March 2026. It is 9 pages, complete, and is signed by the buyer and the seller.", "mortgage-application-form-YQ-74246.pdf — Mortgage application form for property YQ-74246. It shows a date of issue of 7 December 2025. It is 6 pages, complete, and is signed by the applicant.", "credit-bureau-report-YQ-74246.pdf — Credit bureau report for property YQ-74246. It shows a date of issue of 10 March 2026. It is 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must judge whether the pack is complete with respect to the checklist. Step through each checklist line that applies to this case. Only count a required document if it is the kind of document listed (not a similar one), if it is about the subject of the case, if it has all its pages, if it is signed where the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer with complete: every applicable line is met (extra documents do not matter). Answer with incomplete: at least one applicable line is not met. Answer with unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-22", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 906}} {"id": "isc-te-00246-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Glenmark Inc", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "13 July 2026"}, "checklist": ["Obtain proof of savings, issued within the last 2 months.", "Obtain recent bank statements, issued within the last 2 months.", "Obtain a benefit claim form that is valid (not expired) on the date of the review and signed.", "If the claimant has a non-dependant adult living in the household, also obtain a non-dependant income details form, signed.", "Obtain proof of national insurance number.", "Obtain proof of identity that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "Arjun Ingford", "reference": "TO-48296", "details": ["The claimant has a non-dependant adult living in the household."]}, "documents received": ["Proof of identity for Arjun Ingford. Expiry date: 24 July 2028. Single page.", "Proof of savings for Arjun Ingford. Date of issue: 31 May 2026. 2 pages, complete.", "Proof of national insurance number for Arjun Ingford. Date of issue: 30 April 2026. Single page.", "Lottery ticket kept as evidence of funds for Arjun Ingford. Date of issue: 31 May 2026. 2 pages, complete.", "Recent bank statements for Arjun Ingford. Date of issue: 20 June 2026. 12 pages, complete.", "Non-dependant income details form for Arjun Ingford. Date of issue: 29 June 2026. 2 pages, complete. Signed by the non-dependant.", "Benefit claim form for Arjun Ingford. Expiry date: 22 September 2027. 12 pages, complete. Signed by the claimant.", "File: scan_047.jpg. The scan is blank, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 827}} {"id": "isc-te-00139-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Ilvmere GmbH", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "25 May 2026"}, "checklist": ["Open corrective action list, issued within the last 1 months, signed", "Previous audit findings closure file, signed", "Audit scope statement, signed", "Layout tour plan, signed", "Training matrix extract, issued within the last 3 months, signed", "If the audit covers the laboratory, also: laboratory competence scope statement, issued within the last 12 months, signed", "Calibration status summary, issued within the last 1 months, signed"], "submission": {"case": {"name": "customer audit visit VI-63754", "reference": "SW-72463", "details": ["The audit covers the laboratory."]}, "cover note": "I am sorry that this pack was put together in a rush. Please let me know if anything needs another look.", "documents received": ["VI-63754_open_corrective_action_list.pdf - Open corrective action list for customer audit visit VI-63754. Date of issue: 8 May 2026. 2 pages, complete. Signed by the quality management representative.", "VI-63754_calibration_status_summary.pdf - Calibration status summary for customer audit visit VI-63754. Date of issue: 17 May 2026. 2 pages, complete. Signed by the quality management representative.", "VI-63754_laboratory_competence_scope_statement.pdf - Laboratory competence scope statement for customer audit visit VI-63754. Date of issue: 6 May 2026. 2 pages, complete. Signed by the quality management representative.", "VI-63754_previous_audit_findings_closure_file.pdf - Previous audit findings closure file for customer audit visit VI-63754. Date of issue: 19 April 2026. 6 pages, complete. Signed by the quality management representative.", "VI-63754_layout_tour_plan.pdf - Layout tour plan for customer audit visit VI-63754. Date of issue: 15 February 2026. Single page. Signed by the quality management representative.", "VI-63754_audit_scope_statement.pdf - Audit scope statement for customer audit visit VI-63754. Date of issue: 9 March 2026. Single page. Signed by the quality management representative.", "VI-63754_training_matrix_extract.pdf - Training matrix extract for customer audit visit VI-63754. Date of issue: 28 April 2026. 3 pages, complete. Signed by the quality management representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 984}} {"id": "isc-te-00307-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Baxwood Group", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "27 May 2026"}, "checklist": ["Confirm the keys handover receipt is present and signed.", "Confirm the signed draft lease is present and signed.", "Confirm the title information document is present.", "Confirm the energy performance certificate is present and valid (not expired) on 27 May 2026.", "If the tenant is a newly formed company, also confirm the signed parent company guarantee is present and signed.", "Confirm the asbestos survey report is present and was issued within the last 12 months.", "Confirm the stamp duty return is present and signed."], "submission": {"case": {"name": "premises BY-30837", "reference": "LN-29332", "details": ["The tenant is a newly formed company."]}, "documents received": ["draft-lease-BY-30837-signed.pdf — Signed draft lease for premises BY-30837, dated 29 April 2026. 12 pages, complete. Signed by the tenant.", "title-information-document-BY-30837.pdf — Title information document for premises BY-30837, issued 6 February 2026. 3 pages, complete.", "guarantor-consent-letter-BY-30837.pdf — Guarantor consent letter for premises BY-30837, issued 20 May 2026. 1 page. Signed by the guarantor.", "company-search-report-BY-30837.pdf — Company search report for premises BY-30837, issued 20 May 2026. 2 pages, complete.", "keys-handover-receipt-BY-30837.pdf — Keys handover receipt for premises BY-30837, issued 3 April 2026. 1 page. Signed by the landlord's managing agent.", "parent-company-guarantee-BY-30837-signed.pdf — Signed parent company guarantee for premises BY-30837, dated 20 March 2026. 3 pages, complete. Signed by the parent company's authorised signatory.", "asbestos-survey-report-BY-30837.pdf — Asbestos survey report for premises BY-30837, issued 26 April 2026. 4 pages, complete.", "energy-performance-certificate-BY-30837-f.pdf — Energy performance certificate for premises BY-30837, expiring 5 June 2025. 1 page.", "stamp-duty-return-BY-30837.pdf — Stamp duty return for premises BY-30837, issued 8 March 2026. 2 pages, complete. Signed by the tenant's accountant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "expired before the review", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1016}} {"id": "isc-te-00095-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Maldcrest Limited", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "25 June 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed", "Travel policy extract showing advance eligibility", "Employee bank detail confirmation, issued within the last 6 months and signed", "Line manager approval for the advance, signed", "Costed trip estimate sheet, issued within the last 3 months and signed", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Omar Ebbski", "reference": "GH-37714"}, "documents received": ["Payroll deduction agreement for recovery of the advance for Omar Ebbski. Date of issue: 7 April 2026. 1 page. Signed by the employee.", "Employee bank detail confirmation for Omar Ebbski. Date of issue: 6 January 2026. 1 page. Signed by the employee.", "Line manager approval for the advance for Omar Ebbski. Date of issue: 4 March 2026. 1 page. Signed by the line manager.", "Travel policy extract showing advance eligibility for Omar Ebbski. Date of issue: 21 May 2026. 1 page.", "Outstanding advance clearance check for Omar Ebbski. Date of issue: 5 June 2026. 1 page. Signed by the accounts payable team lead.", "Costed trip estimate sheet for Omar Ebbski. Date of issue: 15 May 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00415-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Jaskmouth & Co", "reviewer": "the household's own tax filer", "pack": "annual tax return support file", "purpose": "before the self-assessment tax return is submitted", "date of the review": "11 March 2026"}, "checklist": ["Childcare payment receipt, issued within the last 13 months.", "Rental income record.", "Gift aid donation summary.", "Tax return draft printout, signed.", "Pension contribution certificate, issued within the last 13 months.", "Employment income summary, issued within the last 13 months."], "submission": {"case": {"name": "household tax affairs MM-28293", "reference": "OJ-52114"}, "documents received": ["Pension contribution certificate for household tax affairs MM-28293. Date of issue: 9 November 2025. 2 pages, complete.", "Rental income record for household tax affairs MM-28293. Date of issue: 6 December 2025. 4 pages, complete.", "Childcare payment receipt for household tax affairs MM-28293. Date of issue: 5 February 2026. Single page.", "Gift aid donation summary for household tax affairs MM-28293. Date of issue: 10 December 2025. Single page.", "Tax return draft printout for household tax affairs MM-28293. Date of issue: 10 December 2025. 6 pages, complete. Signed by the household's tax filer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "annual tax return support file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 714}} {"id": "isc-te-00176-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Larvcliff Partners", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "9 March 2026"}, "checklist": ["Check that the pack contains a hotel invoice issued within the last 6 months.", "Check that the pack contains a train ticket receipt.", "Check that the pack contains a signed expense claim form.", "Check that the pack contains a conference fee invoice issued within the last 12 months.", "Check that the pack contains a restaurant receipt issued within the last 6 months."], "submission": {"case": {"name": "Lucy Wraxock", "reference": "HW-17248"}, "cover note": "Ava Farrnall: Apologies that this pack was put together in a rush, and please let me know if anything needs clarifying.", "documents received": ["Hotel invoice for Lucy Wraxock. Date of issue: 9 November 2025. 2 pages, complete.", "Restaurant receipt for Lucy Wraxock. Date of issue: 10 October 2025. Single page.", "Expense claim form for Lucy Wraxock. Date of issue: 13 February 2026. 2 pages, complete. Signed by the claiming employee.", "Taxi fare receipt for Lucy Wraxock. Date of issue: 29 October 2025. Single page.", "Hotel key card sleeve for Lucy Wraxock. Date of issue: 9 November 2025. 2 pages, complete.", "Train ticket receipt for Lucy Wraxock. Date of issue: 18 December 2025. Single page.", "Currency conversion statement for Lucy Wraxock. Date of issue: 5 November 2025. Single page.", "Conference fee invoice for Lucy Wraxock. Date of issue: 31 December 2025. Single page."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 596}} {"id": "isc-te-00174-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Gravwell Ltd", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "24 August 2026"}, "checklist": ["Marketing screenshot pack", "Device compatibility matrix, issued within the last 3 months", "Localisation completeness report, issued within the last 1 months", "Store listing description, issued within the last 1 months", "Privacy policy update, issued within the last 3 months", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months, signed", "Crash-free rate report, issued within the last 1 months"], "submission": {"case": {"name": "mobile app release TG-70212", "reference": "OE-37898"}, "documents received": ["release_notes_TG-70212.pdf - Release notes for mobile app release TG-70212. Date of issue: 11 August 2026. 2 pages, complete.", "privacy_policy_update_TG-70212.pdf - Privacy policy update for mobile app release TG-70212. Date of issue: 15 July 2026. 2 pages, complete.", "crash_free_rate_report_TG-70212.pdf - Crash-free rate report for mobile app release TG-70212. Date of issue: 22 August 2026. Single page.", "store_listing_description_TG-70212.pdf - Store listing description for mobile app release TG-70212. Date of issue: 5 August 2026. Single page.", "marketing_screenshot_pack_TG-70212.pdf - Marketing screenshot pack for mobile app release TG-70212. Date of issue: 8 July 2026. 6 pages, complete.", "age_rating_questionnaire_TG-70212.pdf - Age rating questionnaire for mobile app release TG-70212. Date of issue: 10 July 2026. 2 pages, complete, signed by the mobile release team lead.", "localisation_completeness_report_TG-70212.pdf - Localisation completeness report for mobile app release TG-70212. Date of issue: 21 August 2026. 2 pages, complete.", "device_compatibility_matrix_TG-70212.pdf - Device compatibility matrix for mobile app release TG-70212. Date of issue: 21 August 2026. 2 pages, complete.", "scan_0473.pdf - The file will not open, so its contents cannot be seen.", "analytics_data_consent_statement_TG-70212.pdf - Analytics data consent statement for mobile app release TG-70212. Date of issue: 22 June 2026. Single page, signed by the data protection officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "conditional", "defect": "document present (circumstance not stated), plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 10, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1038}} {"id": "isc-te-00297-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Kaldlock BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "21 July 2026"}, "checklist": ["Written grievance statement, signed", "Witness list, signed", "Adjustment request record, issued within the last 3 months, signed", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed", "Evidence bundle index, signed", "Grievance procedure acknowledgement, issued within the last 3 months, signed"], "submission": {"case": {"name": "Hannah Kerrmore", "reference": "SB-29513", "details": ["The grievance is against the employee's direct manager."]}, "documents received": ["Evidence bundle index about Hannah Kerrmore. Dated 9 July 2026. 2 pages, complete. Signed by the HR case handler.", "Alternative manager reporting line note about Hannah Kerrmore. Dated 16 May 2026. Single page. Signed by the HR case handler.", "Grievance procedure acknowledgement about Hannah Kerrmore. Dated 28 April 2026. Single page. Signed by the complaining employee, Hannah Kerrmore.", "Witness list about Hannah Kerrmore. Dated 21 April 2026. Single page. Signed by the complaining employee, Hannah Kerrmore.", "Written grievance statement about Hannah Kerrmore. Dated 26 April 2026. 3 pages, complete. Signed by the complaining employee, Hannah Kerrmore.", "Adjustment request record about Hannah Kerrmore. Dated 6 July 2026. Single page. Signed by the HR case handler.", "Previous grievance outcome letter about Hannah Kerrmore. Dated 2 August 2024. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 776}} {"id": "isc-te-00233-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Oxlfield SAS", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "6 March 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "Account request form, signed", "Content escalation route, signed", "Naming convention approval, signed"], "submission": {"case": {"name": "new social media account WD-87625", "reference": "WM-51560"}, "documents received": ["Naming convention approval WD-87625.pdf. This single-page naming convention approval for new social media account WD-87625 shows its date of issue as 6 February 2026 and carries the signature of the brand governance manager.", "Content escalation route WD-87625.pdf. This single-page content escalation route for new social media account WD-87625 shows its date of issue as 15 November 2025 and carries the signature of the marketing team lead.", "Account request form WD-87625.pdf. This single-page account request form for new social media account WD-87625 shows its date of issue as 10 December 2025 and carries the signature of the marketing team lead.", "Admin access list WD-87625.pdf. This single-page admin access list for new social media account WD-87625 shows its date of issue as 31 December 2025.", "Platform terms acceptance record WD-87625.pdf. This single-page platform terms acceptance record for new social media account WD-87625 shows its date of issue as 22 November 2025 and carries the signature of the digital operations manager."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack fulfils the checklist. Work through every checklist line relevant to this case. For a required document to count, it must be the kind of document the checklist lists (a similar one will not do), be about the subject of the case, have all its pages, be signed in every place the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, but at least one cannot be settled from what is shown, for instance when a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may prove misleading; evaluate the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-38", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 770}} {"id": "isc-te-00296-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Corvwald GmbH", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "2 April 2026"}, "checklist": ["Statutory holiday entitlement confirmation is enclosed.", "Signed handover note is enclosed.", "Team holiday planner extract is enclosed.", "Manager approval email is enclosed, issued within the last 2 months.", "Leave balance statement is enclosed, issued within the last 3 months."], "submission": {"case": {"name": "Kayla Ostcombe", "reference": "KW-71803"}, "documents received": ["Job description with no handover information for Kayla Ostcombe, dated 9 February 2026. 2 pages, complete. Signed by the HR manager.", "Leave balance statement for Kayla Ostcombe, dated 20 January 2026. 1 page.", "Return to work date confirmation for Kayla Ostcombe, dated 21 March 2026. 1 page.", "Statutory holiday entitlement confirmation for Kayla Ostcombe, dated 16 January 2026. 1 page.", "Manager approval email for Kayla Ostcombe, dated 16 February 2026. 1 page.", "Team holiday planner extract for Kayla Ostcombe, dated 11 December 2025. 2 pages, complete.", "Handover note for Kayla Ostcombe, dated 9 February 2026. 2 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 703}} {"id": "isc-te-00176-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Larvcliff Partners", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "9 March 2026"}, "checklist": ["Check that the pack contains a hotel invoice issued within the last 6 months.", "Check that the pack contains a train ticket receipt.", "Check that the pack contains a signed expense claim form.", "Check that the pack contains a conference fee invoice issued within the last 12 months.", "Check that the pack contains a restaurant receipt issued within the last 6 months."], "submission": {"case": {"name": "Lucy Wraxock", "reference": "HW-17248"}, "cover note": "Ava Farrnall: This pack has already been checked by a colleague before I sent it on to you.", "documents received": ["Taxi fare receipt for Lucy Wraxock. Date of issue: 29 October 2025. Single page.", "Restaurant receipt for Lucy Wraxock. Date of issue: 10 October 2025. Single page.", "File: scan_0001.pdf. The file will not open, so its contents cannot be seen.", "Expense claim form for Lucy Wraxock. Date of issue: 13 February 2026. 2 pages, complete. Signed by the claiming employee.", "Conference fee invoice for Lucy Wraxock. Date of issue: 31 December 2025. Single page.", "Train ticket receipt for Lucy Wraxock. Date of issue: 18 December 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 719}} {"id": "isc-te-00250-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Istfield & Co", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "4 May 2026"}, "checklist": ["If the institute received industry funding above the university's disclosure threshold, also include: industry funding disclosure statement (issued within the last 12 months, signed)", "Include: director's declaration of interests (issued within the last 12 months, signed)", "Include: external advisory board minutes (issued within the last 12 months, signed)", "Include: staffing plan (issued within the last 6 months, signed)", "If the institute hosts research involving human participants, also include: ethics committee annual return (issued within the last 12 months, signed)", "Include: publications list (issued within the last 12 months)", "Include: annual activity report (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Lombfeld Ltd", "reference": "EI-33164", "details": ["The institute received industry funding above the university's disclosure threshold.", "The institute hosts research involving human participants."]}, "cover note": "Please find attached the annual review pack for Lombfeld Ltd, reference EI-33164, for the committee's meeting on 4 May 2026. A colleague has already checked this pack before it was sent to you.", "documents received": ["EI-33164_Directors_declaration_of_interests_2025-05-15.pdf - Director's declaration of interests for Lombfeld Ltd, dated 15 May 2025. Single page. Signed by the institute director.", "EI-33164_Financial_expenditure_summary_2026-04-14.pdf - Financial expenditure summary for Lombfeld Ltd, dated 14 April 2026. 3 pages, complete. Signed by the finance officer.", "EI-33164_Publications_list_2025-09-20.pdf - Publications list for Lombfeld Ltd, dated 20 September 2025. 4 pages, complete.", "EI-33164_Ethics_committee_annual_return_2025-12-28.pdf - Ethics committee annual return for Lombfeld Ltd, dated 28 December 2025. 2 pages, complete. Signed by the ethics committee chair.", "EI-33164_Staffing_plan_2026-03-31.pdf - Staffing plan for Lombfeld Ltd, dated 31 March 2026. 2 pages, complete. Signed by the institute director.", "EI-33164_Industry_funding_disclosure_statement_2025-11-17.pdf - Industry funding disclosure statement for Lombfeld Ltd, dated 17 November 2025. Single page. Signed by the institute director.", "EI-33164_Annual_activity_report_2025-11-25.pdf - Annual activity report for Lombfeld Ltd, dated 25 November 2025. 12 pages, complete. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1083}} {"id": "isc-te-00259-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Bravwell SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 September 2026"}, "checklist": ["Check that the identity verification document is valid, that is not expired, on the date of the review.", "Check that the loyalty scheme enrolment form is signed.", "Check that the terms and conditions acceptance sheet is signed.", "Check that the points transfer request is signed.", "Check that the marketing consent form is signed.", "Check that the initial points balance statement was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also check that the points transfer evidence statement was issued within the last 3 months and is signed."], "submission": {"case": {"name": "Agnieszka Daskcombe", "reference": "WN-41554", "details": ["The customer is transferring points from a rival scheme."]}, "documents received": ["Customer contact details sheet - Agnieszka Daskcombe.pdf. A single-page customer contact details sheet for Agnieszka Daskcombe, dated 16 June 2026, signed by the customer.", "Points transfer evidence statement - Agnieszka Daskcombe.pdf. A single-page points transfer evidence statement for Agnieszka Daskcombe, dated 26 August 2026, signed by the customer.", "Loyalty scheme enrolment form - Agnieszka Daskcombe.pdf. A single-page loyalty scheme enrolment form for Agnieszka Daskcombe, dated 12 May 2026, signed by the customer.", "Marketing consent form - Agnieszka Daskcombe.pdf. A single-page marketing consent form for Agnieszka Daskcombe, dated 28 August 2026, signed by the customer.", "Initial points balance statement - Agnieszka Daskcombe.pdf. A single-page initial points balance statement for Agnieszka Daskcombe, dated 27 July 2026.", "Terms and conditions acceptance sheet - Agnieszka Daskcombe.pdf. A single-page terms and conditions acceptance sheet for Agnieszka Daskcombe, dated 9 July 2026, signed by the customer.", "Identity verification document - Agnieszka Daskcombe.pdf. A single-page identity verification document for Agnieszka Daskcombe, showing an expiry date of 20 May 2028.", "Points transfer request - Agnieszka Daskcombe.pdf. A single-page points transfer request for Agnieszka Daskcombe, dated 23 May 2026, signed by the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 956}} {"id": "isc-te-00326-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Marlthorpe LLP", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "5 August 2026"}, "checklist": ["P60 tax summary, issued within the last 15 months", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months and signed", "Passport, valid (not expired) on the date of the review", "Mortgage application form, issued within the last 3 months and signed", "Property valuation report, issued within the last 3 months and signed"], "submission": {"case": {"name": "Henry Bramell", "reference": "PP-95128", "details": ["The borrower is not self-employed."]}, "documents received": ["Property_Valuation_Report_Bramell_PP-95128.pdf — Property valuation report for Henry Bramell. Date of issue: 19 July 2026. 8 pages, complete. Signed by the valuer.", "Payslips_Bramell_PP-95128.pdf — Three most recent payslips for Henry Bramell. Date of issue: 28 May 2026. 3 pages, complete.", "Passport_Bramell_PP-95128.pdf — Passport for Henry Bramell. Expiry date: 23 September 2026. 2 pages, complete.", "P60_Bramell_PP-95128.pdf — P60 tax summary for Henry Bramell. Date of issue: 9 December 2025. 2 pages, complete.", "Loan_Affordability_Calculator_Printout_Bramell_PP-95128.pdf — Loan affordability calculator printout for Henry Bramell. Date of issue: 25 May 2026. 10 pages, complete. Signed by the mortgage adviser."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The verdict complete: every applicable line is met (extra documents do not matter). The verdict incomplete: at least one applicable line is not met. The verdict unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-21", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00408-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Jarlfeld Inc", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "17 April 2026"}, "checklist": ["Signed audit checklist for each area visited", "Signed audit finding sheets", "Signed audit interview notes", "Signed audit attendance sheet", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list (signed)", "Signed previous audit follow-up record issued within the last 24 months"], "submission": {"case": {"name": "internal audit OC-33937", "reference": "ST-29209", "details": ["The audit did not cover the calibration laboratory."]}, "documents received": ["OC-33937_audit_interview_notes.pdf. Audit interview notes for internal audit OC-33937, dated 10 April 2026. 3 pages, complete. Signed by the lead auditor.", "OC-33937_audit_attendance_sheet.pdf. Audit attendance sheet for internal audit OC-33937, dated 16 January 2026. Single page. Signed by the site management review board chair.", "OC-33937_audit_finding_sheets_scan.pdf. Audit finding sheets for internal audit OC-33937, dated 26 March 2026. 2 pages, complete. The last page is cropped, so the signature block cannot be seen and it is not known whether the document is signed.", "OC-33937_previous_audit_follow_up_record.pdf. Previous audit follow-up record for internal audit OC-33937, dated 29 March 2026. 2 pages, complete. Signed by the quality manager.", "OC-33937_audit_checklist.pdf. Audit checklist for each area visited for internal audit OC-33937, dated 1 March 2026. 4 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 623}} {"id": "isc-te-00336-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Ebrmark Ltd", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "31 July 2026"}, "checklist": ["If the adult lacks capacity to make the decision about their care arrangements, also include: best interests decision record (signed)", "If the adult owns property that could be considered in the financial assessment, also include: property valuation report (issued within the last 12 months, signed)", "recent bank statements (issued within the last 3 months)", "proof of identity (valid (not expired) on the date of the review)", "needs assessment report (signed)", "safeguarding referral form (issued within the last 12 months, signed)", "financial assessment form (signed)"], "submission": {"case": {"name": "Eilidh Arnmore", "reference": "FN-37990", "details": ["The adult has capacity to make the decision about their care arrangements.", "The adult owns property that could be considered in the financial assessment."]}, "cover note": "I am sorry that this pack was put together in a rush. Kind regards, Mert Natock", "documents received": ["needs-assessment-report-eilidh-arnmore.pdf - Needs assessment report about Eilidh Arnmore. Date of issue: 5 June 2026. 12 pages, complete. Signed by the social worker.", "library-card-eilidh-arnmore.pdf - Library card with no photo or date of birth about Eilidh Arnmore. Expiry date: 19 November 2026. 1 page.", "safeguarding-referral-form-eilidh-arnmore.pdf - Safeguarding referral form about Eilidh Arnmore. Date of issue: 23 November 2025. 2 pages, complete. Signed by the safeguarding officer.", "bank-statements-eilidh-arnmore.pdf - Recent bank statements about Eilidh Arnmore. Date of issue: 29 July 2026. 8 pages, complete.", "financial-assessment-form-eilidh-arnmore.pdf - Financial assessment form about Eilidh Arnmore. Date of issue: 13 June 2026. 6 pages, complete. Signed by the financial assessment officer.", "support-plan-eilidh-arnmore.pdf - Support plan about Eilidh Arnmore. Date of issue: 8 April 2026. 6 pages, complete. Signed by the social worker.", "property-valuation-report-eilidh-arnmore.pdf - Property valuation report about Eilidh Arnmore. Date of issue: 8 October 2025. 2 pages, complete. Signed by the property valuer.", "proof-of-identity-eilidh-arnmore.pdf - Proof of identity about Eilidh Arnmore. Expiry date: 19 November 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1025}} {"id": "isc-te-00483-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Maldwater plc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "9 June 2026"}, "checklist": ["Signed witness statement from a staff member", "Incident report from the day, issued within the last 3 months and signed", "Staff training record for the duty manager, issued within the last 24 months and signed", "CCTV footage stills of the incident, issued within the last 3 months", "Signed liability claim form", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed", "Photographs of the spillage on the floor, issued within the last 1 months", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed"], "submission": {"case": {"name": "Varnlund GmbH", "reference": "JH-79417", "details": ["The customer is handling the claim personally.", "The injured customer did not go to hospital."]}, "documents received": ["Cleaning log for the day of the incident - Varnlund GmbH.pdf. A single-page cleaning log for the day of the incident at Varnlund GmbH, dated 6 April 2026. It is signed by the cleaner on duty.", "CCTV footage stills of the incident - Varnlund GmbH.pdf. Stills of the incident at Varnlund GmbH, dated 27 March 2026, 2 pages, complete.", "Incident report from the day - Varnlund GmbH.pdf. An incident report about Varnlund GmbH, dated 10 May 2026, 2 pages, complete. It is signed by the duty manager.", "Witness statement from a staff member - Varnlund GmbH.pdf. A single-page statement about Varnlund GmbH, dated 27 May 2026. It is signed by the staff member who witnessed the incident.", "Liability claim form - Varnwarf.pdf. A claim form about Varnlund GmbH, dated 13 May 2026, 3 pages, complete. It is signed by the injured customer.", "Staff training record for the duty manager - Varnlund GmbH.pdf. A training record for the duty manager at Varnlund GmbH, dated 29 March 2026, 2 pages, complete. It is signed by the store manager.", "Photographs of the spillage on the floor - Varnlund GmbH.pdf. A single page of photographs of the spillage on the floor at Varnlund GmbH, dated 1 June 2026."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "partial", "defect": "signed", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 968}} {"id": "isc-te-00404-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Oxlbury GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "11 August 2026"}, "checklist": ["Signed lease agreement, signed.", "Racking inspection report, issued within the last 12 months, signed.", "Planning permission.", "Asbestos survey.", "If the warehouse stores food products, also: food storage approval certificate, valid (not expired) on the date of the review.", "Utilities connection certificate."], "submission": {"case": {"name": "warehouse CF-86712", "reference": "NS-98453"}, "documents received": ["warehouse-insurance-policy-CF-86712.pdf — Warehouse insurance policy for warehouse CF-86712. Expiry date: 19 November 2028. 6 pages, complete.", "asbestos-survey-CF-86712.pdf — Asbestos survey for warehouse CF-86712. Date of issue: 5 May 2026. 5 pages, complete.", "food-storage-approval-certificate-CF-86712.pdf — Food storage approval certificate for warehouse CF-86712. Expiry date: 19 October 2027. 1 page.", "racking-inspection-report-CF-86712.pdf — Racking inspection report for warehouse CF-86712. Date of issue: 24 August 2025. 2 pages, complete. Signed by the racking inspector.", "utilities-connection-certificate-CF-86712.pdf — Utilities connection certificate for warehouse CF-86712. Date of issue: 29 May 2026. 1 page.", "planning-permission-CF-86712.pdf — Planning permission for warehouse CF-86712. Date of issue: 2 July 2026. 2 pages, complete.", "lease-agreement-CF-86712.pdf — Signed lease agreement for warehouse CF-86712. Date of issue: 2 May 2026. 8 pages, complete. Signed by the landlord and Oxlbury GmbH."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 868}} {"id": "isc-te-00124-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Gravside LLP", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "20 May 2026"}, "checklist": ["Check the pack includes the public liability insurance schedule.", "Check the pack includes the signed liability claim form.", "Check the pack includes the cleaning log for the day of the incident, issued within the last 6 months and signed.", "If the injured customer was taken to hospital by ambulance, also: check the pack includes the ambulance service record, issued within the last 12 months and signed.", "Check the pack includes the staff training record for the duty manager, issued within the last 24 months and signed.", "Check the pack includes the incident report from the day, issued within the last 3 months and signed.", "Check the pack includes the witness statement from a staff member, signed."], "submission": {"case": {"name": "Marlburg SAS", "reference": "LR-18403", "details": ["The injured customer was taken to hospital by ambulance."]}, "cover note": "Please find attached everything needed for this review, all complete. Let me know if you need anything further. Kind regards, Lotte Ingstad", "documents received": ["cleaning_log_day_of_incident_Marlburg_SAS.pdf. Cleaning log for the day of the incident for Marlburg SAS, dated 26 December 2025, signed by the cleaner. Single page.", "witness_statement_staff_member_Marlburg_SAS.pdf. Witness statement from a staff member for Marlburg SAS, dated 8 April 2026, signed by the staff member. Single page.", "public_liability_insurance_schedule_Marlburg_SAS.pdf. Public liability insurance schedule for Marlburg SAS, dated 19 February 2026. 4 pages, complete.", "liability_claim_form_Marlburg_SAS.pdf. Liability claim form for Marlburg SAS, dated 14 May 2026, signed by the claimant. 3 pages, complete.", "incident_report_Marlburg_SAS.pdf. Incident report from the day for Marlburg SAS, dated 8 May 2026, signed by the duty manager. 2 pages, complete.", "staff_training_record_duty_manager_Marlburg_SAS.pdf. Staff training record for the duty manager for Marlburg SAS, dated 14 January 2025, signed by the duty manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 909}} {"id": "isc-te-00278-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Wendwyn Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "7 September 2026"}, "checklist": ["Sales invoice or receipt for the sale proceeds, issued within the last 3 months.", "Signed asset disposal request form.", "Signed board or budget holder approval for the disposal.", "Signed asset de-registration and tag removal record."], "submission": {"case": {"name": "disposed asset FF-78187", "reference": "WP-26906"}, "cover note": "Could you approve this as quickly as you can? Everything is in order on my side.", "documents received": ["Asset disposal request form - FF-78187 - 22 July 2026. 2 pages, complete. The asset disposal request form for disposed asset FF-78187, dated 22 July 2026, signed by the requesting budget holder.", "Board or budget holder approval for the disposal - FF-78187 - 17 May 2026. A single-page board or budget holder approval for the disposal of asset FF-78187, dated 17 May 2026, signed by a director on behalf of the board.", "Sales invoice for sale proceeds - FF-78187 - 27 July 2026. A single-page sales invoice or receipt for the sale proceeds relating to disposed asset FF-78187, dated 27 July 2026.", "Asset de-registration and tag removal record - FF-78187 - 12 August 2026. A single-page asset de-registration and tag removal record for disposed asset FF-78187, dated 12 August 2026. A sticky note covers the signature block, so it cannot be seen whether the record is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 794}} {"id": "isc-te-00051-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Pelllund plc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "15 September 2026"}, "checklist": ["Check that the kit contents list is in the pack.", "Check that the store installation guide is in the pack.", "If the kit includes an electrical display unit, also check that an electrical safety test certificate issued within the last 12 months is in the pack.", "Check that a signed point of sale design proof is in the pack.", "Check that a kit cost breakdown issued within the last 3 months and signed is in the pack."], "submission": {"case": {"name": "merchandising kit JJ-94285", "reference": "ZH-89674", "details": ["The kit includes no electrical display unit."]}, "documents received": ["Store_installation_guide_JJ-94285.pdf. This is the store installation guide for merchandising kit JJ-94285, dated 9 September 2026. 6 pages, complete.", "Napkin_sketch_JJ-94285.pdf. This is a rough sketch on a napkin about merchandising kit JJ-94285, dated 17 August 2026. 4 pages, complete. It is signed by the designer.", "Kit_cost_breakdown_JJ-94285.pdf. This is the kit cost breakdown for merchandising kit JJ-94285, dated 11 July 2026. 2 pages, complete. It is signed by the retail marketing manager.", "Kit_contents_list_JJ-94285.pdf. This is the kit contents list for merchandising kit JJ-94285, dated 12 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 785}} {"id": "isc-te-00298-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Holham Limited", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "9 June 2026"}, "checklist": ["Check that the pack contains the written grievance statement, signed.", "Check that the pack contains the witness list, signed.", "Check that the pack contains the meeting invitation with rights explained, issued within the last 1 months.", "Check that the pack contains the previous grievance outcome letter, issued within the last 24 months.", "Check that the pack contains the grievance procedure acknowledgement, issued within the last 3 months and signed."], "submission": {"case": {"name": "Amelia Ostford", "reference": "BI-54578"}, "cover note": "I am sorry that this pack was put together in a rush. I hope it is still in a usable state for your review.", "documents received": ["Written grievance statement about Amelia Ostford, dated 7 April 2026. 3 pages, complete. Signed by Amelia Ostford.", "Grievance procedure acknowledgement about Amelia Ostford, dated 6 June 2026. Single page. Signed by Amelia Ostford.", "Meeting invitation with rights explained, about Amelia Ostford, dated 26 May 2026. Single page.", "Witness list about Amelia Ostford, dated 16 April 2026. Single page. Signed by Amelia Ostford.", "Previous grievance outcome letter about Amelia Ostford, dated 27 March 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "signed", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 715}} {"id": "isc-te-00476-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Elstton Partners", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "13 August 2026"}, "checklist": ["Leave balance statement issued within the last 3 months.", "Completed annual leave request form, signed.", "Manager approval email issued within the last 2 months.", "Return to work date confirmation.", "Statutory holiday entitlement confirmation.", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave, signed.", "Team holiday planner extract."], "submission": {"case": {"name": "Khalid Sabnall", "reference": "ZF-30873", "details": ["The employee is not requesting leave during a known busy period."]}, "documents received": ["Completed annual leave request form for Khalid Sabnall, issued 19 June 2026. Single page, signed by the employee.", "Handover note for Khalid Sabnall, issued 9 May 2026. 2 pages, complete. Signed by the line manager.", "Team holiday planner extract for Khalid Sabnall, issued 18 May 2026. 2 pages, complete.", "Return to work date confirmation for Khalid Sabnall, issued 16 July 2026. Single page.", "Manager approval email for Khalid Sabnall, issued 8 July 2026. Single page.", "Leave balance statement for Khalid Sabnall, issued 16 June 2026. Single page.", "File named file_0043.pdf. The scan is blank and the contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Your task is to decide whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-40", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 744}} {"id": "isc-te-00213-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Bravhaven Partners", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "6 July 2026"}, "checklist": ["Council flood warning notice, issued within the last 12 months", "Loss adjuster's inspection report, issued within the last 6 months and signed", "Debris removal invoice, issued within the last 6 months", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "Buildings insurance policy schedule"], "submission": {"case": {"name": "property OD-78962", "reference": "ZY-65584"}, "documents received": ["loss_adjusters_inspection_report_OD-78962_v3.pdf - Loss adjuster's inspection report about property OD-78962. Dated 4 April 2026. 6 pages, complete. Signed by the loss adjuster.", "utility_suppliers_letter_OD-78962.pdf - Utility supplier's letter confirming the supply was cut off about property OD-78962. Dated 9 September 2025. 1 page.", "photographs_of_flood_water_in_the_rooms_OD-78962.pdf - Photographs of flood water in the rooms about property OD-78962. Dated 21 June 2026. 3 pages, complete.", "debris_removal_invoice_OD-78962.pdf - Debris removal invoice about property OD-78962. Dated 19 January 2026. 1 page.", "buildings_insurance_policy_schedule_OD-78962.pdf - Buildings insurance policy schedule about property OD-78962. Dated 10 March 2026. 5 pages, complete.", "council_flood_warning_notice_OD-78962.pdf - Council flood warning notice about property OD-78962. Dated 3 April 2026. 1 page.", "flood_claim_form_OD-78962.pdf - Flood claim form about property OD-78962. Dated 9 April 2026. 5 pages, complete. Signed by the policyholder."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and say whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must concern the subject of the case, all its pages must be present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-0", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 895}} {"id": "isc-te-00233-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Oxlfield SAS", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "6 March 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "Account request form, signed", "Content escalation route, signed", "Naming convention approval, signed"], "submission": {"case": {"name": "new social media account WD-87625", "reference": "WM-51560"}, "documents received": ["Content escalation route WD-87625.pdf. This single-page content escalation route for new social media account WD-87625 shows its date of issue as 15 November 2025. The signature area is covered by a sticky note, so it cannot be seen whether the document is signed.", "Admin access list WD-87625.pdf. This single-page admin access list for new social media account WD-87625 shows its date of issue as 31 December 2025.", "Account request form WD-87625.pdf. This single-page account request form for new social media account WD-87625 shows its date of issue as 10 December 2025 and carries the signature of the marketing team lead.", "Naming convention approval WD-87625.pdf. This single-page naming convention approval for new social media account WD-87625 shows its date of issue as 6 February 2026 and carries the signature of the brand governance manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 715}} {"id": "isc-te-00234-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Nordridge & Co", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "13 April 2026"}, "checklist": ["Confirm the pack includes an account purpose statement.", "Confirm the pack includes a two-factor authentication confirmation issued within the last 3 months.", "Confirm the pack includes an admin access list issued within the last 3 months.", "Confirm the pack includes a naming convention approval that is signed.", "If the account will post content about financial products, also confirm the pack includes a financial promotions approval note issued within the last 3 months and signed.", "Confirm the pack includes an account request form that is signed."], "submission": {"case": {"name": "new social media account WY-2923", "reference": "PH-42275", "details": ["The account will post content about financial products."]}, "documents received": ["Scanned naming convention approval about new social media account WY-2923, showing its date of issue as 5 April 2026, and signed by the social media governance team lead. The scan is a single page.", "Scanned two-factor authentication confirmation about new social media account WY-2923, showing its date of issue as 22 March 2026. The scan is a single page.", "Scanned platform terms acceptance record about new social media account WY-2923, showing its date of issue as 30 January 2026, and signed by the requesting marketing manager. The scan is a single page.", "Scanned admin access list about new social media account WY-2923, showing its date of issue as 21 February 2026. The scan is a single page.", "Scanned account request form about new social media account WY-2923, showing its date of issue as 13 March 2026, and signed by the requesting marketing manager. The scan is a single page.", "Scanned account purpose statement about new social media account WY-2923, showing its date of issue as 29 December 2025. The scan is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 852}} {"id": "isc-te-00422-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pentridge Ltd", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "1 May 2026"}, "checklist": ["Supplier response letter, issued within the last 3 months and signed", "Contract compliance checklist, signed", "Quality inspection report, issued within the last 6 months and signed", "If the supplier is being considered for an expanded scope, also: expanded scope assessment memo, signed", "Invoice discrepancy log", "Delivery record summary, issued within the last 12 months"], "submission": {"case": {"name": "Lombcombe BV", "reference": "RE-90972", "details": ["The supplier's scope is staying the same."]}, "documents received": ["Quality inspection report for Lombcombe BV, dated 24 April 2026. 3 pages, complete. Signed by the quality inspector.", "Delivery record summary for Lombcombe BV, dated 7 January 2026. 2 pages, complete.", "Supplier response letter for Lombcombe BV, dated 13 October 2025. A single page, signed by the supplier's account manager.", "Service level summary for Lombcombe BV, dated 18 December 2025. A single page.", "Invoice discrepancy log for Lombcombe BV, dated 1 January 2026. 2 pages, complete.", "Contract compliance checklist for Lombcombe BV, dated 5 January 2026. 3 pages, complete. Signed by the procurement lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 706}} {"id": "isc-te-00251-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Halvness Ltd", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "2 July 2026"}, "checklist": ["If the equipment is above the major purchase threshold, also include: tender waiver justification (signed)", "equipment purchase request form (signed)", "cost-benefit justification", "maintenance plan", "training needs assessment (signed)", "installation requirements note"], "submission": {"case": {"name": "equipment JG-44908", "reference": "EJ-48033", "details": ["The equipment is below the major purchase threshold."]}, "documents received": ["maintenance plan - JG-44908.pdf. This is the maintenance plan for equipment JG-44908, dated 24 March 2026, 2 pages, complete.", "training needs assessment - JG-44908.pdf. This is the training needs assessment for equipment JG-44908, dated 8 May 2026. It is a single page and is signed by the training coordinator.", "warranty leaflet - JG-44908.pdf. This is a warranty leaflet from a different product, dated 24 March 2026, 2 pages, complete. It refers to equipment JG-44908 only in the file name.", "equipment purchase request form - JG-44908.pdf. This is the equipment purchase request form for equipment JG-44908, dated 18 April 2026, 2 pages, complete. It is signed by the requesting department head.", "installation requirements note - JG-44908.pdf. This is the installation requirements note for equipment JG-44908, dated 29 April 2026, 2 pages, complete.", "cost-benefit justification - JG-44908.pdf. This is the cost-benefit justification for equipment JG-44908, dated 28 May 2026, 3 pages, complete.", "vendor quotation - JG-44908.pdf. This is the vendor quotation for equipment JG-44908, dated 14 May 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Look at each checklist line that applies to this case. A required document will only count if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Where a line is conditional, it applies only when its circumstance holds for the case. Give the answer complete: every applicable line is met (extra documents do not matter). Give the answer incomplete: at least one applicable line is not met. Give the answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-17", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 904}} {"id": "isc-te-00121-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jundmoor Partners", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "4 August 2026"}, "checklist": ["Drying contractor's certificate of completion, issued within the last 6 months and signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Buildings insurance policy schedule", "Council flood warning notice, issued within the last 12 months", "Flood claim form, signed"], "submission": {"case": {"name": "property KX-91092", "reference": "OX-34504"}, "documents received": ["d8_debris_removal_invoice_KX91092.pdf — Debris removal invoice for property KX-91092, dated 16 May 2026. 1 page.", "d5_flood_claim_form_KX91092.pdf — Flood claim form for property KX-91092, dated 9 April 2026. 5 pages, complete. Signed by the claimant.", "d1_drying_contractors_certificate_of_completion_KX91092.pdf — Drying contractor's certificate of completion for property KX-91092, dated 17 May 2026. 2 pages, complete. Signed by the drying contractor.", "d6_newspaper_clipping_KX91092.pdf — Newspaper clipping about flooding in another town, concerning property KX-91092, dated 1 March 2026. 1 page.", "d3_buildings_insurance_policy_schedule_KX91092.pdf — Buildings insurance policy schedule for property KX-91092, dated 13 May 2026. 5 pages, complete.", "d7_loss_adjusters_inspection_report_KX91092.pdf — Loss adjuster's inspection report for property KX-91092, dated 8 May 2026. 6 pages, complete. Signed by the loss adjuster.", "d2_photographs_of_flood_water_in_the_rooms_KX91092.pdf — Photographs of flood water in the rooms at property KX-91092, dated 19 July 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 898}} {"id": "isc-te-00328-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Ebrmont BV", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "30 April 2026"}, "checklist": ["Three most recent payslips, issued within the last 3 months.", "Passport, valid (not expired) on the date of the review.", "Three months of bank statements, issued within the last 3 months.", "Gifted deposit letter, issued within the last 3 months and signed.", "Property valuation report, issued within the last 3 months and signed."], "submission": {"case": {"name": "Jonas Radton", "reference": "OO-69836"}, "documents received": ["Passport for Jonas Radton, showing an expiry date of 31 August 2027. 2 pages, complete.", "Gifted deposit letter for Jonas Radton, dated 16 April 2026. 1 page, signed by the donor of the gift.", "P60 tax summary for Jonas Radton, dated 15 April 2026. 2 pages, complete.", "Three months of bank statements for Jonas Radton, issued on 24 February 2026. 9 pages, complete.", "Three most recent payslips for Jonas Radton, dated 2 March 2026. 3 pages, complete.", "Property valuation report for Jonas Radton, dated 26 March 2026. 8 pages, complete. The signature area is obscured by a sticky note, so it is not known whether the report is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 717}} {"id": "isc-te-00070-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Teskcrest SAS", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "15 September 2026"}, "checklist": ["Grant fund eligibility note, issued within the last 6 months, signed", "Training needs assessment, signed", "Installation requirements note", "Equipment purchase request form, signed", "Cost-benefit justification"], "submission": {"case": {"name": "equipment OJ-32008", "reference": "IV-17107"}, "documents received": ["Installation requirements note for equipment OJ-32008, dated 30 June 2026, 2 pages, complete.", "Cost-benefit justification for equipment OJ-32008, dated 5 September 2026, 3 pages, complete.", "Training needs assessment for equipment OJ-32008, dated 23 June 2026, 1 page, signed by the training coordinator.", "Maintenance plan for equipment OJ-32008, dated 4 July 2026, 2 pages, complete.", "Equipment purchase request form for equipment OJ-32008, dated 8 July 2026, 2 pages, complete, signed by the requesting department head.", "Vendor quotation for equipment OJ-32008, dated 6 September 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must judge if the pack is complete relative to the checklist. Review each line of the checklist that has relevance to this case. To count, a required document must match the kind of document the checklist specifies (a similar one will not do), must relate to the subject of the case, must include all its pages, must be signed wherever the checklist calls for a signature, must still be valid on the review date (that is, not expired), and must have been issued during the period the checklist permits. A conditional line binds the case only if the circumstance it describes actually holds. complete: all applicable lines are satisfied, and extra documents are of no consequence. incomplete: at least one applicable line fails. unclear: no line fails outright, but at least one cannot be decided on the basis of what is displayed, for example a necessary date, signature or page count is not visible, the kind of a document cannot be told, or the case details are silent on whether a conditional line's circumstance holds while that line's document is missing. Do not rely on cover notes or labels, which may mislead; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-52", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 726}} {"id": "isc-te-00241-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Glenside Ltd", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "2 March 2026"}, "checklist": ["Service level summary, issued within the last 12 months", "Corrective action plan, issued within the last 6 months, signed", "Contract compliance checklist, signed", "Supplier performance scorecard, signed", "Invoice discrepancy log"], "submission": {"case": {"name": "Varnridge Partners", "reference": "SE-38332"}, "documents received": ["Invoice discrepancy log - Varnridge Partners.pdf. The document is an invoice discrepancy log about Varnridge Partners, dated 7 December 2025, with 2 pages, complete.", "Service level summary - Varnridge Partners.pdf. The document is a service level summary about Varnridge Partners, dated 20 May 2025. It is a single page.", "Supplier performance scorecard - Varnridge Partners.pdf. The document is a supplier performance scorecard about Varnridge Partners, dated 6 February 2026, with 2 pages, complete. It is signed by the category manager.", "Contract compliance checklist - Varnridge Partners.pdf. The document is a contract compliance checklist about Varnridge Partners, dated 30 January 2026, with 3 pages, complete. It is signed by the procurement officer.", "Bank statement - Varnridge Partners.pdf. The document is a bank statement showing payments made about Varnridge Partners, dated 7 December 2025, with 2 pages, complete.", "Supplier response letter - Varnridge Partners.pdf. The document is a supplier response letter about Varnridge Partners, dated 15 February 2026. It is a single page, signed by the supplier's operations director.", "Corrective action plan - Varnridge Partners.pdf. The document is a corrective action plan about Varnridge Partners, dated 23 December 2025, with 2 pages, complete. It is signed by the supplier's account manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 823}} {"id": "isc-te-00189-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ovarfield GmbH", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "17 June 2026"}, "checklist": ["Costed trip estimate sheet, issued within the last 3 months and signed.", "Travel advance request form, signed.", "Employee bank detail confirmation, issued within the last 6 months and signed.", "Travel policy extract showing advance eligibility.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Trip itinerary and approval, issued within the last 3 months and signed."], "submission": {"case": {"name": "Mert Bramstad", "reference": "VR-72958", "details": ["The requested advance is above the standard advance limit."]}, "documents received": ["VR-72958_d2_travel_advance_request_form.pdf. A single-page travel advance request form for Mert Bramstad, dated 21 March 2026. It is signed by the employee.", "VR-72958_d3_employee_bank_detail_confirmation.pdf. A single-page employee bank detail confirmation for Mert Bramstad, dated 29 May 2026. It is signed by the payroll administrator.", "VR-72958_d4_travel_policy_extract.pdf. A single-page travel policy extract showing advance eligibility for Mert Bramstad, dated 28 May 2026.", "VR-72958_d5_trip_itinerary_and_approval.pdf. A trip itinerary and approval for Mert Bramstad, dated 8 April 2026, 2 pages, complete. It is signed by the approving manager.", "VR-72958_d1_costed_trip_estimate_sheet.pdf. A single-page costed trip estimate sheet for Mert Bramstad, dated 28 April 2026. It is signed by the employee's line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00377-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Vornburg & Co", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "24 April 2026"}, "checklist": ["If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "venue access instructions (issued within the last 3 months)", "If the delegate requires an adjusted learning plan, also: learning support agreement (signed)", "payment confirmation (issued within the last 3 months)", "delegate photo identification (valid (not expired) on the date of the review)", "special requirements note", "cancellation policy acceptance (signed)"], "submission": {"case": {"name": "course booking UL-99308", "reference": "DD-21847", "details": ["The course leads to a licensed qualification.", "The delegate requires no adjusted learning plan."]}, "documents received": ["Licence eligibility declaration for course booking UL-99308, issued on 4 April 2026. Single page. Signed by the delegate.", "Payment confirmation for course booking UL-99308, issued on 20 April 2026. Single page.", "Cancellation policy acceptance for course booking UL-99308, issued on 25 February 2026. Single page. Signed by the delegate.", "Special requirements note for course booking UL-99308, issued on 21 January 2026. Single page.", "Venue access instructions for course booking UL-99308. The issue date is covered by an ink stamp and cannot be read. Single page.", "Delegate photo identification for course booking UL-99308. It shows an expiry date of 19 December 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 763}} {"id": "isc-te-00359-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Ilvbrook Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "17 July 2026"}, "checklist": ["Hotel availability printout, issued within the last 1 month and signed", "Package holiday brochure page", "If the booking includes a car hire, also: car hire quotation, issued within the last 1 month", "Passport details form, signed", "Flight availability printout, issued within the last 1 month", "Travel insurance quote, issued within the last 1 month", "Booking request form, signed"], "submission": {"case": {"name": "holiday booking FU-13646", "reference": "DM-77175", "details": ["The booking includes a car hire."]}, "documents received": ["Customer deposit receipt for holiday booking FU-13646, dated 20 May 2026. Single page.", "Package holiday brochure page for holiday booking FU-13646, dated 29 April 2026. Single page.", "Travel insurance quote for holiday booking FU-13646, dated 5 July 2026. 2 pages, complete.", "Hotel availability printout for holiday booking FU-13646, dated 28 June 2026. 2 pages, complete. Signed by the reservations manager.", "Passport details form for holiday booking FU-13646, dated 24 April 2026. Single page. Signed by the customer.", "Booking request form for holiday booking FU-13646, dated 3 July 2026. 2 pages, complete. Signed by the reservations clerk.", "Flight availability printout for holiday booking FU-13646, dated 10 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00171-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Fennthorpe plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "3 September 2026"}, "checklist": ["Root cause analysis report, issued within the last 3 months and signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months and signed.", "Follow-up owner assignment sheet, issued within the last 3 months and signed.", "If the incident involved a data leak to an outside party, also: data breach notification record, issued within the last 3 months and signed.", "Customer impact statement, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Remediation items list, issued within the last 3 months and signed."], "submission": {"case": {"name": "production incident NA-65901", "reference": "RU-67954", "details": ["The incident was caused entirely by internal systems.", "The incident involved a data leak to an outside party."]}, "documents received": ["NA-65901_postmortem_meeting_minutes.pdf - Postmortem meeting minutes for production incident NA-65901, dated 7 August 2026. 3 pages, complete. Signed by the chair of the postmortem meeting.", "NA-65901_root_cause_analysis_report.pdf - Root cause analysis report for production incident NA-65901, dated 4 August 2026. 5 pages, complete. Signed by the lead reliability engineer.", "NA-65901_data_breach_notification_record.pdf - Data breach notification record for production incident NA-65901, dated 6 August 2026. 2 pages, complete. Signed by the data protection officer.", "NA-65901_press_release.pdf - Press release about a new product launch, dated 8 August 2026, connected to production incident NA-65901. 2 pages, complete.", "NA-65901_customer_impact_statement.pdf - Customer impact statement for production incident NA-65901, dated 8 August 2026. 2 pages, complete.", "NA-65901_follow_up_owner_assignment_sheet.pdf - Follow-up owner assignment sheet for production incident NA-65901, dated 31 August 2026. Single page. Signed by the incident manager.", "NA-65901_remediation_items_list.pdf - Remediation items list for production incident NA-65901, dated 6 July 2026. 2 pages, complete. Signed by the engineering manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 982}} {"id": "isc-te-00413-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Quorhaven BV", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "31 July 2026"}, "checklist": ["Confirm the pack contains a store installation guide.", "Confirm the pack contains a flammability test certificate issued within the last 12 months.", "Confirm the pack contains a brand colour specification.", "Confirm the pack contains a shipping manifest issued within the last 1 months.", "Confirm the pack contains a kit contents list.", "Confirm the pack contains a kit cost breakdown issued within the last 3 months and signed."], "submission": {"case": {"name": "merchandising kit BG-68516", "reference": "EJ-95989"}, "cover note": "Please could you approve this pack as soon as possible, as all the paperwork is in order? Thanks, Aoife Tadwell", "documents received": ["Flammability test certificate for merchandising kit BG-68516, dated 17 July 2026. Single page.", "Store installation guide for merchandising kit BG-68516, dated 29 May 2026. 6 pages, complete.", "Kit cost breakdown for merchandising kit BG-68516, dated 17 July 2026. 2 pages, complete. Signed by the finance manager.", "Kit contents list for merchandising kit BG-68516, dated 19 April 2026. 2 pages, complete.", "Brand colour specification for merchandising kit BG-68516, dated 7 June 2026. Single page.", "Shipping manifest for merchandising kit BG-68516, dated 12 July 2026. Pages 1-1 of 2, so 1 of its 2 pages is included."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Reply complete: every applicable line is met (extra documents do not matter). Reply incomplete: at least one applicable line is not met. Reply unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-15", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 807}} {"id": "isc-te-00039-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Iskton GmbH", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "29 July 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include: mediation request confirmation (issued within the last 1 months, signed)", "original service agreement copy", "breach evidence log (issued within the last 1 months, signed)", "cure period expiry calculation (issued within the last 1 months, signed)", "litigation hold notice (issued within the last 1 months, signed)", "default notice previously served (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Ovarfeld Ltd", "reference": "BZ-18824", "details": ["The contract allows termination without prior mediation."]}, "documents received": ["Original service agreement copy for Ovarfeld Ltd, dated 31 May 2026. 10 pages, complete.", "Breach evidence log for Ovarfeld Ltd, issued 20 July 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Losses calculation statement for Ovarfeld Ltd, issued 25 July 2026. 3 pages, complete. Signed by the finance manager.", "Default notice previously served on Ovarfeld Ltd, dated 6 June 2026. Single page. Signed by the contracts manager.", "Litigation hold notice for Ovarfeld Ltd, issued 27 July 2026. 2 pages, complete. Signed by the general counsel.", "Cure period expiry calculation for Ovarfeld Ltd, issued 20 July 2026. 2 pages, complete. Signed by the contracts manager."]}}, "question": {"type": "choice", "instructions": "Judge whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-12", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 761}} {"id": "isc-te-00333-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Iskwald Limited", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "3 April 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed.", "Anti-bribery policy statement, signed.", "Certificate of insurance, valid (not expired) on the date of the review.", "Signed copy of the general terms and conditions, signed."], "submission": {"case": {"name": "Dundfeld Ltd", "reference": "GD-75611"}, "cover note": "I am sorry that this pack was put together in a rush. Please get in touch if anything needs explaining.", "documents received": ["Anti-bribery policy statement for Dundfeld Ltd, dated 22 January 2026. 2 pages, complete. Signed by a company director.", "Signed copy of the general terms and conditions for Dundfeld Ltd, dated 10 March 2026. 6 pages, complete. Signed by a company director.", "Certificate of insurance for Dundfeld Ltd, expiring 24 January 2028. 2 pages, complete.", "Bank details confirmation letter for Dundfeld Ltd, dated 14 January 2026. Single page. Signed by a bank officer."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Look at each checklist line that applies to this case. A required document will only count if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Where a line is conditional, it applies only when its circumstance holds for the case. Give the answer complete: every applicable line is met (extra documents do not matter). Give the answer incomplete: at least one applicable line is not met. Give the answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "variant-17", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 679}} {"id": "isc-te-00167-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Orrwell Limited", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "14 April 2026"}, "checklist": ["Identity verification document (valid, not expired, on the date of the review)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Marketing consent form (signed)", "Customer contact details sheet (signed)", "Initial points balance statement (issued within the last 3 months)", "Loyalty scheme enrolment form (signed)"], "submission": {"case": {"name": "Brooke Ullstad", "reference": "VX-71748", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Loyalty scheme enrolment form VX-71748_d5.pdf. A one-page loyalty scheme enrolment form for Brooke Ullstad, dated 8 January 2026. The form is signed by the customer.", "Customer contact details sheet VX-71748_d3.pdf. A one-page customer contact details sheet for Brooke Ullstad, dated 29 March 2026. The sheet is signed by the customer.", "Terms and conditions acceptance sheet VX-71748_d8.pdf. A one-page terms and conditions acceptance sheet for Brooke Ullstad, dated 2 February 2026. The sheet is signed by the customer.", "Marketing consent form VX-71748_d2.pdf. A one-page marketing consent form for Brooke Ullstad, dated 20 February 2026. The form is signed by the customer.", "Initial points balance statement VX-71748_d4.pdf. A one-page initial points balance statement for Brooke Ullstad, dated 10 March 2026.", "Identity verification document VX-71748_d7.pdf. A one-page identity verification document for Brooke Ullstad. It shows an expiry date of 23 April 2026.", "Identity verification document VX-71748_d9.pdf. A one-page identity verification document for Brooke Ullstad. It shows an expiry date of 27 February 2025."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 873}} {"id": "isc-te-00350-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Pravfell plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "19 August 2026"}, "checklist": ["Check the remediation items list, issued within the last 3 months, signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months, signed.", "Check the follow-up owner assignment sheet, issued within the last 3 months, signed.", "Check the postmortem meeting minutes, issued within the last 3 months, signed.", "Check the customer impact statement, issued within the last 3 months.", "If the incident involved a data leak to an outside party, also: data breach notification record, issued within the last 3 months, signed.", "Check the incident timeline, issued within the last 3 months."], "submission": {"case": {"name": "production incident ZQ-13927", "reference": "EV-82488", "details": ["The incident was caused entirely by internal systems.", "The incident involved a data leak to an outside party."]}, "documents received": ["Incident timeline for production incident ZQ-13927, issued 22 June 2026, 3 pages, complete.", "Root cause analysis report for production incident ZQ-13927, issued 11 August 2026, 5 pages, complete, signed by the root cause analysis author.", "Postmortem meeting minutes for production incident ZQ-13927, issued 25 June 2026, 3 pages, complete, signed by the postmortem chair.", "Remediation items list for production incident ZQ-13927, issued 10 June 2026, 2 pages, complete, signed by the incident remediation lead.", "Service level objective breach record for production incident ZQ-13927, issued 28 July 2026, single page.", "Data breach notification record for production incident ZQ-13927, issued 20 July 2026, 2 pages, complete, signed by the data protection officer.", "Follow-up owner assignment sheet for production incident ZQ-13927, issued 28 July 2026, single page, signed by the reliability engineering lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 900}} {"id": "isc-te-00089-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Fravwyn Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "16 July 2026"}, "checklist": ["Special requests note, signed", "Booking request form, signed", "Flight availability printout, issued within the last 1 months", "Passport details form, signed", "Travel insurance quote, issued within the last 1 months", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review", "Customer deposit receipt, issued within the last 3 months"], "submission": {"case": {"name": "holiday booking DO-39970", "reference": "NL-53165", "details": ["The booking includes a child traveller."]}, "documents received": ["Hotel availability printout DO-39970. Issued 12 July 2026. 2 pages, complete, signed by the reservations agent.", "Customer deposit receipt DO-39970. Issued 19 May 2026. 1 page.", "Flight availability printout DO-39970. Issued 8 July 2026. 2 pages, complete.", "Special requests note DO-39970. Issued 17 June 2026. 1 page, signed by the customer.", "Travel insurance quote DO-39970. Issued 8 July 2026. 2 pages, complete.", "Passport details form DO-39970. Issued 15 June 2026. 1 page, signed by the customer.", "Booking request form DO-39970. Issued 23 April 2026. 2 pages, complete, signed by the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 791}} {"id": "isc-te-00454-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Jundmouth Limited", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "25 March 2026"}, "checklist": ["Licence reassignment note, issued within the last 3 months, signed", "If the server will be sold or donated rather than destroyed, also: disposal vendor certificate of destruction, issued within the last 3 months, signed", "Decommission request form, signed", "Data wipe certificate, issued within the last 3 months, signed", "Data migration confirmation, issued within the last 3 months, signed", "Dependent systems check report, issued within the last 3 months"], "submission": {"case": {"name": "retired server NC-63421", "reference": "LV-96718", "details": ["The server will be sold or donated rather than destroyed."]}, "documents received": ["Single-page data wipe certificate for retired server NC-63421, dated 29 January 2026, signed by the disposal technician.", "Single-page licence reassignment note for retired server NC-63421, dated 10 March 2026, signed by the IT asset manager.", "Decommission request form for retired server NC-63421, dated 4 February 2026. 2 pages, complete. Signed by the infrastructure operations manager.", "Single-page asset register update for retired server NC-63421, dated 21 March 2026.", "Data migration confirmation for retired server NC-63421, dated 19 January 2026. 2 pages, complete. Signed by the systems migration lead.", "Dependent systems check report for retired server NC-63421, dated 13 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 785}} {"id": "isc-te-00080-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Morvfell & Co", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "26 August 2026"}, "checklist": ["Root cause analysis report, issued within the last 3 months and signed.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Service level objective breach record, issued within the last 3 months.", "Follow-up owner assignment sheet, issued within the last 3 months and signed.", "Alerting rules review note, issued within the last 3 months."], "submission": {"case": {"name": "production incident VT-77812", "reference": "UP-54074"}, "documents received": ["Follow-up owner assignment sheet for production incident VT-77812, dated 13 June 2026. Single page. Signed by the reliability engineering manager.", "Alerting rules review note for production incident VT-77812, dated 21 June 2026. 2 pages, complete.", "Service level objective breach record for production incident VT-77812, dated 29 June 2026. Single page.", "Postmortem meeting minutes for production incident VT-77812, dated 20 July 2026. 3 pages, complete. Signed by the chair of the postmortem meeting.", "Root cause analysis report for production incident VT-77812, dated 7 July 2026. 5 pages, complete. Signed by the reliability engineering lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 723}} {"id": "isc-te-00399-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Bravhall GmbH", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "7 May 2026"}, "checklist": ["If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement (valid (not expired) on the date of the review, signed)", "fit-out cost estimate (issued within the last 6 months, signed)", "training course completion certificate (issued within the last 12 months)", "pilot operation audit report (issued within the last 6 months, signed)", "signed franchise agreement counterpart (signed)", "franchise disclosure document receipt (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Aldstead Group", "reference": "OF-61011"}, "cover note": "Please find the pack for reference OF-61011 attached. A colleague has already checked it. Best regards, Faisal Staningham", "documents received": ["Aldstead Group signed franchise agreement counterpart.pdf. The counterpart is dated 9 April 2026 and runs to 12 pages, complete. It is signed by an authorised signatory of Bravhall GmbH and by Aldstead Group.", "Aldstead Group franchise disclosure document receipt.pdf. The receipt is dated 9 March 2026 and is a single page. It is signed by the franchisee's authorised representative.", "Aldstead Group training course completion certificate.pdf. The certificate is dated 7 April 2026 and is a single page.", "Aldstead Group pilot operation audit report.pdf. The report is dated 17 February 2026 and runs to 8 pages, complete. It is signed by the lead auditor.", "Aldstead Group fit-out cost estimate.pdf. The estimate is dated 12 April 2026 and runs to 4 pages, complete. It is signed by the fit-out contractor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00410-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Faldmark Ltd", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "27 August 2026"}, "checklist": ["Check that the IT equipment loan form is present and signed.", "Check that the placement learning plan is present and signed.", "Check that the internship agreement is present and signed.", "Check that the confidentiality undertaking is present and signed.", "If the internship is paid, also check that the payroll registration form is present and signed.", "Check that the right to work check record is present, signed, and issued within the last 6 months."], "submission": {"case": {"name": "Carmen Radton", "reference": "DN-88378", "details": ["The internship is paid."]}, "documents received": ["Placement learning plan for Carmen Radton, dated 10 May 2026. 2 pages, complete. Signed by the marketing supervisor.", "Payroll registration form for Carmen Radton, dated 21 August 2026. 2 pages, complete. Signed by the payroll officer.", "Confidentiality undertaking for Carmen Radton, dated 10 August 2026. 2 pages, complete. Signed by Carmen Radton.", "Emergency contact form for Carmen Radton, dated 2 May 2026. Single page.", "Internship agreement for Carmen Radton, dated 8 June 2026. 4 pages, complete. Signed by the marketing manager.", "Right to work check record for Carmen Radton, dated 29 March 2026. Single page. Signed by the HR officer.", "IT equipment loan form for Carmen Radton, dated 15 August 2026. Single page. Signed by the IT manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 761}} {"id": "isc-te-00022-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Orrham & Co", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "26 March 2026"}, "checklist": ["Cost estimate, issued within the last 3 months and signed.", "Planned completion date sheet, signed.", "Parts order confirmation, issued within the last 1 months.", "Photographs of the fault, issued within the last 3 months.", "If the job involves working at height above two metres, also: permit to work at height, issued within the last 1 months and signed.", "Risk assessment for the task, issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request GA-62900", "reference": "IH-29832", "details": ["The job involves no work at height above two metres."]}, "documents received": ["cost-estimate-GA-62900-v3.pdf - Cost estimate for maintenance request GA-62900, issued 12 December 2025. 2 pages, complete. Signed by the estimator.", "risk-assessment-for-the-task-GA-62900.pdf - Risk assessment for the task for maintenance request GA-62900, issued 18 March 2026. 5 pages, complete. Signed by the assessor.", "parts-order-confirmation-GA-62900.pdf - Parts order confirmation for maintenance request GA-62900, issued 9 March 2026. Single page.", "job-request-form-GA-62900.pdf - Job request form for maintenance GA-62900, issued 12 January 2026. Single page. Signed by the requester.", "photographs-of-the-fault-GA-62900.pdf - Photographs of the fault for maintenance request GA-62900, issued 2 February 2026. 2 pages, complete.", "planned-completion-date-sheet-GA-62900.pdf - Planned completion date sheet for maintenance request GA-62900, issued 12 February 2026. Single page. Signed by the job planner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 865}} {"id": "isc-te-00255-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Yselmoor Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "28 August 2026"}, "checklist": ["Customer contact details sheet (signed)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Loyalty scheme enrolment form (signed)", "Marketing consent form (signed)", "Initial points balance statement (issued within the last 3 months)", "Identity verification document (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Camille Rookett", "reference": "EV-96904", "details": ["The customer is joining as a single-person account."]}, "documents received": ["Initial points balance statement for Camille Rookett. It is dated 17 July 2026 and is a single page. It shows the member's starting points balance.", "Identity verification document for Camille Rookett. It is a single page. It shows an expiry date of 21 December 2028.", "Loyalty scheme enrolment form for Camille Rookett. It is dated 9 May 2026 and is a single page. It is signed by the member, Camille Rookett.", "Customer contact details sheet for Camille Rookett. It is dated 30 April 2026 and is a single page. It is signed by the member, Camille Rookett.", "Marketing consent form for Camille Rookett. It is dated 30 April 2026 and is a single page. It is signed by the member, Camille Rookett."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00436-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Ivrlund SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "6 March 2026"}, "checklist": ["Confirm that the points transfer request is present and signed", "Confirm that the identity verification document is present and valid, that is not expired, on the date of the review", "Confirm that the nominated store preference form is present and signed", "Confirm that the customer contact details sheet is present and signed", "Confirm that the terms and conditions acceptance sheet is present and signed", "Confirm that the marketing consent form is present and signed"], "submission": {"case": {"name": "Brooke Cormworth", "reference": "YP-76900"}, "documents received": ["Single-page identity verification document concerning Brooke Cormworth, showing an expiry date of 2 May 2026.", "Single-page initial points balance statement dated 4 February 2026, concerning Brooke Cormworth.", "Single-page points transfer request dated 9 February 2026, concerning Brooke Cormworth. The request carries the signature of the transferring member.", "Single-page newsletter subscription confirmation for a different shop, dated 28 January 2026, concerning Brooke Cormworth. The confirmation is signed by the member.", "Single-page customer contact details sheet dated 27 January 2026, concerning Brooke Cormworth. The sheet is signed by the member.", "Single-page nominated store preference form dated 26 February 2026, concerning Brooke Cormworth. The form is signed by the member.", "Single-page marketing consent form dated 28 January 2026, concerning Brooke Cormworth. The form is signed by the member.", "Single-page terms and conditions acceptance sheet dated 30 November 2025, concerning Brooke Cormworth. The sheet is signed by the member."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 779}} {"id": "isc-te-00170-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Ebrshaw Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "13 April 2026"}, "checklist": ["Proposed architecture diagram", "Migration and rollout plan", "Review board feedback summary (issued within the last 3 months, signed)", "Problem statement page", "Cost estimate sheet (issued within the last 6 months)", "If the design introduces a new third-party dependency, also: third-party dependency risk assessment (issued within the last 6 months, signed)", "If the design changes how customer data is stored, also: data protection review sign-off (signed)"], "submission": {"case": {"name": "design document UC-75490", "reference": "AO-68653", "details": ["The design introduces no new third-party dependency.", "The design does not change how customer data is stored."]}, "documents received": ["Proposed architecture diagram for design document UC-75490, dated 21 December 2025. Single page.", "Problem statement page for design document UC-75490, dated 19 March 2026. 2 pages, complete.", "Review board feedback summary for design document UC-75490, dated 13 March 2026. 2 pages, complete. Signed by the review board chair.", "Cost estimate sheet for design document UC-75490, dated 20 February 2026. 2 pages, complete.", "Migration and rollout plan for design document UC-75490, dated 22 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist. Work through every checklist line that applies to this case. Only a document that is the kind listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows counts as satisfying a required document. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-48", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 751}} {"id": "isc-te-00097-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Quorwater LLP", "reviewer": "the financial controller", "pack": "bank reconciliation review file", "purpose": "before the reconciliation is signed off in the ledger", "date of the review": "8 April 2026"}, "checklist": ["Bank statement for the period, issued within the last 2 months.", "Bank charges and interest explanation sheet, signed.", "Direct debit mandate report from the bank, issued within the last 3 months.", "Outstanding receipts list.", "Bank reconciliation statement, signed."], "submission": {"case": {"name": "company bank account YA-14391", "reference": "OU-26776"}, "documents received": ["Bank statement for the period covering company bank account YA-14391. Date of issue: 25 March 2026. 4 pages, complete.", "Bank charges and interest explanation sheet for company bank account YA-14391. Date of issue: 7 February 2026. Single page. Signed by the accountant.", "Outstanding receipts list for company bank account YA-14391. Date of issue: 12 December 2025. Single page.", "Direct debit mandate report from the bank for company bank account YA-14391. Date of issue: 29 January 2025. 2 pages, complete.", "Bank reconciliation statement for company bank account YA-14391. Date of issue: 29 March 2026. 2 pages, complete. Signed by the financial controller.", "General ledger cash account listing for company bank account YA-14391. Date of issue: 13 December 2025. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "bank reconciliation review file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00079-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Fervridge Partners", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "2 March 2026"}, "checklist": ["Payment gateway technical specification: all pages included.", "Fraud screening configuration sheet: signed.", "Gateway integration request form: signed.", "Data protection impact assessment: issued within the last 12 months, signed.", "Go-live sign-off certificate: issued within the last 1 months, signed.", "Merchant account agreement: signed.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review."], "submission": {"case": {"name": "payment gateway XI-37260", "reference": "SY-57899", "details": ["The gateway will store customers' card details."]}, "cover note": "Please find everything needed attached and complete.", "documents received": ["Payment gateway technical specification for payment gateway XI-37260. Date of issue: 5 January 2026. 8 pages, complete.", "Gateway integration request form for payment gateway XI-37260. Date of issue: 18 January 2026. 2 pages, complete, signed by the requesting merchant manager.", "Penetration test summary for payment gateway XI-37260. Date of issue: 15 December 2025. 3 pages, complete, signed by the penetration test lead.", "Fraud screening configuration sheet for payment gateway XI-37260. Date of issue: 14 November 2025. Single page, signed by the fraud screening administrator.", "Merchant account agreement for payment gateway XI-37260. Date of issue: 2 February 2026. 6 pages, complete, signed by the merchant account holder.", "Data protection impact assessment for payment gateway XI-37260. Date of issue: 26 August 2025. 5 pages, complete, signed by the data protection officer.", "Go-live sign-off certificate for payment gateway XI-37260. Date of issue: 21 February 2026. Single page, signed by the payments operations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 869}} {"id": "isc-te-00011-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ebrhurst BV", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "16 March 2026"}, "checklist": ["Credit bureau report issued within the last 1 months", "Bank statement issued within the last 3 months", "Signed sale and purchase agreement", "Employment certificate issued within the last 1 months and signed", "Property valuation report issued within the last 6 months and signed", "Photo identity document valid (not expired) on the date of the review"], "submission": {"case": {"name": "property JV-52110", "reference": "YG-70426"}, "cover note": "Please accept my apologies that this pack was put together in a rush.", "documents received": ["proof_of_deposit_JV-52110.pdf — Proof of deposit for property JV-52110, dated 5 February 2026. Single page.", "bank_statement_JV-52110.pdf — Bank statement for property JV-52110, dated 17 February 2026. 3 pages, complete.", "photo_identity_document_JV-52110.pdf — Photo identity document for property JV-52110, expiring 19 March 2028. Single page.", "property_valuation_report_JV-52110.pdf — Property valuation report for property JV-52110, dated 6 November 2025. Signed by the valuer. 10 pages, complete.", "sale_and_purchase_agreement_JV-52110.pdf — Sale and purchase agreement for property JV-52110, dated 26 November 2025. Signed by the buyer and the seller. 9 pages, complete.", "employment_certificate_JV-52110.pdf — Employment certificate for property JV-52110, dated 11 March 2026. Single page. Signed by the employer.", "student_card_with_photo_JV-52110.pdf — Student card with a photo for property JV-52110, expiring 19 March 2028. Single page.", "credit_bureau_report_JV-52110.pdf — Credit bureau report for property JV-52110, dated 3 March 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 907}} {"id": "isc-te-00472-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lombcliff Partners", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "3 August 2026"}, "checklist": ["Risk assessment for the task, issued within the last 3 months and signed.", "Cost estimate, issued within the last 3 months and signed.", "If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Access authorisation slip, signed.", "Photographs of the fault, issued within the last 3 months.", "Parts order confirmation, issued within the last 1 months."], "submission": {"case": {"name": "maintenance request XO-61833", "reference": "IR-85731", "details": ["The job involves no work at height above two metres."]}, "documents received": ["Cost estimate for maintenance request XO-61833, dated 1 June 2026. 2 pages, complete. Signed by the estimating officer.", "Parts order confirmation for maintenance request XO-61833, dated 13 November 2025. Single page.", "Photographs of the fault for maintenance request XO-61833, dated 19 July 2026. 2 pages, complete.", "Job request form for maintenance request XO-61833, dated 16 July 2026. Single page. Signed by the requesting manager.", "Risk assessment for the task on maintenance request XO-61833, dated 4 June 2026. 5 pages, complete. Signed by the assessing supervisor.", "Access authorisation slip for maintenance request XO-61833, dated 6 July 2026. Single page. Signed by the access controller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 776}} {"id": "isc-te-00356-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Orrford SAS", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "31 March 2026"}, "checklist": ["Booking voucher, issued within the last 6 months.", "Driving licence, valid (not expired) on the date of the review, signed.", "Fuel policy sheet, signed.", "Credit card in the driver's name, valid (not expired) on the date of the review, signed.", "Insurance excess waiver certificate, valid (not expired) on the date of the review."], "submission": {"case": {"name": "Zofia Ingova", "reference": "SN-55445"}, "documents received": ["Fuel policy sheet for Zofia Ingova, dated 28 January 2026. One page. Signed by the driver.", "Driving licence for Zofia Ingova, expiring 16 May 2027. 2 pages, complete. Signed by the licence holder.", "Insurance excess waiver certificate for Zofia Ingova, expiring 26 October 2027. 2 pages, complete.", "Booking voucher for Zofia Ingova, dated 23 November 2025. One page.", "Credit card in the driver's name for Sarah Lovden, expiring 14 September 2028. One page. Signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 682}} {"id": "isc-te-00045-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Teskmouth BV", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "24 June 2026"}, "checklist": ["If the supplier subcontracts part of the production, also: subcontractor approval record (issued within the last 12 months, signed)", "Raw material certificate of analysis (issued within the last 6 months, signed)", "Financial stability statement (issued within the last 12 months, signed)", "Supplier self-assessment report (issued within the last 12 months, signed)", "Certified quality management system certificate (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Orrwood Ltd", "reference": "EW-86026", "details": ["The supplier carries out all production in-house."]}, "documents received": ["Certified quality management system certificate for Orrwood Ltd, with an expiry date of 7 September 2026. Single page.", "Supplier audit report for Orrwood Ltd, dated 13 December 2024. 8 pages, complete. Signed by the lead auditor.", "Supplier self-assessment report for Orrwood Ltd, dated 7 September 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Supplier quality questionnaire for Orrwood Ltd, dated 7 May 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Raw material certificate of analysis for Orrwood Ltd, dated 9 February 2026. 2 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 728}} {"id": "isc-te-00381-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Teskhurst Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "10 July 2026"}, "checklist": ["Engineer's service report, issued within the last 1 months and signed", "System pressure test results, issued within the last 1 months and signed", "Asset condition photograph sheet, issued within the last 1 months", "Plant room access sign-in sheet", "Refrigerant top-up log, issued within the last 1 months and signed", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "If refrigerant was added during the service, also: refrigerant recovery note, issued within the last 1 months and signed"], "submission": {"case": {"name": "air conditioning system OO-39937", "reference": "DM-20771", "details": ["Refrigerant was added during the service."]}, "documents received": ["Sign_In_OO-39937.pdf. Plant room access sign-in sheet for air conditioning system OO-39937, dated 24 June 2026. Single page.", "Condition_Photos_OO-39937.pdf. Asset condition photograph sheet for air conditioning system OO-39937, dated 29 June 2026. 2 pages, complete.", "F_Gas_Certificate_OO-39937.pdf. Engineer F-gas handling certificate for air conditioning system OO-39937, with an expiry date of 2 July 2028. Single page.", "Recovery_Note_OO-39937.pdf. Refrigerant recovery note for air conditioning system OO-39937, dated 21 June 2026. Single page. Signed by the recovering engineer.", "Top_Up_Log_OO-39937.pdf. Refrigerant top-up log for air conditioning system OO-39937, dated 8 July 2026. Single page. Signed by the service engineer.", "Service_Report_OO-39937.pdf. Engineer's service report for air conditioning system OO-39937, dated 27 June 2026. 3 pages, complete. Signed by the service engineer.", "File_011.pdf. The scan is blank, so its contents cannot be seen.", "Refrigerant_Log_OO-39937.pdf. Old refrigerant log from a previous year for air conditioning system OO-39937, dated 8 July 2026. Single page. Signed by the service engineer.", "Pressure_Test_OO-39937.pdf. System pressure test results for air conditioning system OO-39937, dated 4 July 2026. 2 pages, complete. Signed by the testing engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1017}} {"id": "isc-te-00303-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Fravfell Partners", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "22 April 2026"}, "checklist": ["Staff training record for the duty manager, issued within the last 24 months and signed", "CCTV footage stills of the incident, issued within the last 3 months", "Incident report from the day, issued within the last 3 months and signed", "Cleaning log for the day of the incident, issued within the last 6 months and signed", "Witness statement from a staff member, signed"], "submission": {"case": {"name": "Dornmere LLP", "reference": "YX-91405"}, "cover note": "I am not sure everything needed is in this pack, so please look it over.", "documents received": ["CCTV footage stills of the incident, Dornmere LLP, dated 23 March 2026. 2 pages, complete.", "Scan_047.pdf. The file will not open, so its contents cannot be seen.", "Photographs of the spillage on the floor, Dornmere LLP, dated 9 April 2026. 1 page.", "Cleaning log for the day of the incident, Dornmere LLP, dated 24 January 2026. 1 page. Signed by the cleaner.", "Staff training record for the duty manager, Dornmere LLP, dated 2 May 2025. 2 pages, complete. Signed by the duty manager.", "Incident report from the day, Dornmere LLP, dated 11 February 2026. 2 pages, complete. Signed by the duty manager.", "Witness statement from a staff member, Dornmere LLP, dated 11 April 2026. 1 page. Signed by the staff member who wrote it."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 790}} {"id": "isc-te-00075-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Baxton Limited", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 April 2026"}, "checklist": ["Confirm the pack contains the marketing consent form, signed.", "Confirm the pack contains the nominated store preference form, signed.", "Confirm the pack contains the identity verification document, valid and not expired on the date of the review.", "Confirm the pack contains the loyalty scheme enrolment form, signed.", "If the customer is transferring points from a rival scheme, also: confirm the pack contains the points transfer evidence statement, issued within the last 3 months and signed.", "Confirm the pack contains the points transfer request, signed.", "Confirm the pack contains the terms and conditions acceptance sheet, signed."], "submission": {"case": {"name": "Katerina Wraxsall", "reference": "SQ-40557", "details": ["The customer is transferring points from a rival scheme."]}, "documents received": ["Points transfer evidence statement - Katerina Wraxsall.pdf. This single-page points transfer evidence statement concerning Katerina Wraxsall is dated 11 February 2026 and carries the signature of the customer.", "Loyalty scheme enrolment form - Katerina Wraxsall.pdf. This single-page loyalty scheme enrolment form concerning Katerina Wraxsall is dated 2 April 2026 and carries the signature of the customer.", "Points transfer request - Katerina Wraxsall.pdf. This single-page points transfer request concerning Katerina Wraxsall is dated 17 January 2026 and carries the signature of the customer.", "Nominated store preference form - Katerina Wraxsall.pdf. This single-page nominated store preference form concerning Katerina Wraxsall is dated 18 March 2026 and carries the signature of the customer.", "Identity verification document - Katerina Wraxsall.pdf. This single-page identity verification document concerning Katerina Wraxsall shows an expiry date of 4 May 2028.", "Terms and conditions acceptance sheet - Katerina Wraxsall.pdf. This single-page terms and conditions acceptance sheet concerning Katerina Wraxsall is dated 10 March 2026 and carries the signature of the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 883}} {"id": "isc-te-00469-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Faldwater Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "25 May 2026"}, "checklist": ["Confirm the pack contains a prerequisite certificate.", "Confirm the pack contains a signed course booking form.", "If the course leads to a licensed qualification, also confirm the pack contains a signed licence eligibility declaration.", "Confirm the pack contains a signed cancellation policy acceptance.", "Confirm the pack contains a special requirements note.", "Confirm the pack contains an employer sponsorship letter issued within the last 3 months and signed.", "Confirm the pack contains a payment confirmation issued within the last 3 months."], "submission": {"case": {"name": "course booking WV-19849", "reference": "FX-94940", "details": ["The course leads to a licensed qualification."]}, "documents received": ["Prerequisite certificate for course booking WV-19849. Date of issue: 28 April 2026. 1 page.", "Employer sponsorship letter for course booking WV-19849. Date of issue: 6 May 2026. 1 page. Signed by the employer's sponsoring manager.", "Cancellation policy acceptance for course booking WV-19849. Date of issue: 2 March 2026. 1 page. Signed by the delegate.", "Special requirements note for course booking WV-19849. Date of issue: 18 April 2026. 1 page.", "Payment confirmation for course booking WV-19849. Date of issue: 7 March 2026. 1 page.", "Course booking form for course booking WV-19849. Date of issue: 5 April 2026. 2 pages, complete. Signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case, one by one. A required document counts only if: it is the kind of document listed (not a similar one); it is about the subject of the case; it has all its pages; it is signed where the checklist asks for a signature; it has not expired on the date of the review; and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-2", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00101-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Morvdale LLP", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "20 May 2026"}, "checklist": ["Confirm the pack includes company statutes (signed).", "Confirm the pack includes company tax registration certificate.", "Confirm the pack includes proof of registered office address (issued within the last 3 months).", "Confirm the pack includes certificate of incorporation.", "Confirm the pack includes authorised signer identity document (valid (not expired) on the date of the review).", "Confirm the pack includes beneficial owner identification form (signed).", "If the company operates in a cash-intensive trade, also: cash handling policy (signed)."], "submission": {"case": {"name": "Eskholm Ltd", "reference": "DW-46602", "details": ["The company does not operate in a cash-intensive trade."]}, "documents received": ["Eskholm Ltd - Shareholder register extract.pdf - Shareholder register extract for Eskholm Ltd, issued 2 March 2026. 2 pages, complete.", "Eskholm Ltd - Company tax registration certificate.pdf - Company tax registration certificate for Eskholm Ltd, issued 4 May 2026. Single page.", "Eskholm Ltd - Proof of registered office address.pdf - Proof of registered office address for Eskholm Ltd, issued 17 March 2026. Single page.", "Eskholm Ltd - Authorised signer identity document.pdf - Authorised signer identity document for Eskholm Ltd, with expiry date 21 November 2026. Single page.", "Eskholm Ltd - Beneficial owner identification form.pdf - Beneficial owner identification form for Eskholm Ltd, issued 23 January 2026. 3 pages, complete. Signed by the authorised signer.", "Eskholm Ltd - Business name reservation receipt.pdf - Business name reservation receipt for Eskholm Ltd, issued 18 April 2026. Single page.", "Eskholm Ltd - Company statutes.pdf - Company statutes for Eskholm Ltd, issued 28 February 2026. 12 pages, complete. Signed by the chair of the board.", "Eskholm Ltd - Certificate of incorporation.pdf - Certificate of incorporation for Eskholm Ltd, issued 18 April 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Does the pack fully satisfy the checklist? Check every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not trust cover notes and labels blindly, as they may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-73", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 880}} {"id": "isc-te-00079-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Fervridge Partners", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "2 March 2026"}, "checklist": ["Payment gateway technical specification: all pages included.", "Fraud screening configuration sheet: signed.", "Gateway integration request form: signed.", "Data protection impact assessment: issued within the last 12 months, signed.", "Go-live sign-off certificate: issued within the last 1 months, signed.", "Merchant account agreement: signed.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review."], "submission": {"case": {"name": "payment gateway XI-37260", "reference": "SY-57899", "details": ["The gateway will store customers' card details."]}, "cover note": "Could you approve this quickly, as all the paperwork is in order?", "documents received": ["Payment gateway technical specification for payment gateway XI-37260. Date of issue: 5 January 2026. 8 pages, complete.", "Merchant account agreement for payment gateway XI-37260. Date of issue: 2 February 2026. 6 pages, complete, signed by the merchant account holder.", "Data protection impact assessment for payment gateway XI-37260. Date of issue: 26 August 2025. 5 pages, complete, signed by the data protection officer.", "Go-live sign-off certificate for payment gateway XI-37260. Date of issue: 21 February 2026. Single page, signed by the payments operations manager.", "Fraud screening configuration sheet for payment gateway XI-37260. Date of issue: 14 November 2025. Single page, signed by the fraud screening administrator.", "Gateway integration request form for payment gateway XI-37260. Date of issue: 18 January 2026. 2 pages, complete, signed by the requesting merchant manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete according to the checklist? Read through all checklist lines that apply to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. The answer complete means every applicable line is met (extra documents do not matter). The answer incomplete means at least one applicable line is not met. The answer unclear means no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; therefore judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-19", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00273-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Pravburg Group", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "11 May 2026"}, "checklist": ["Confirm the pack includes the final payroll cut-off note, issued within the last 1 months and signed.", "If the leaver is moving to a competitor, also: confidential data removal attestation, issued within the last 1 months and signed.", "Confirm the pack includes the shared mailbox handover record, issued within the last 1 months and signed.", "Confirm the pack includes the leaver notification form, signed.", "Confirm the pack includes the non-disclosure reminder acknowledgement, signed.", "Confirm the pack includes the line manager confirmation, issued within the last 1 months and signed.", "Confirm the pack includes the access rights inventory, issued within the last 1 months."], "submission": {"case": {"name": "Elena Ingmore", "reference": "CR-23529", "details": ["The leaver is not moving to a competitor."]}, "documents received": ["non-disclosure reminder acknowledgement – Elena Ingmore.pdf. A non-disclosure reminder acknowledgement concerning Elena Ingmore, dated 26 March 2026. It is a single page and is signed by Elena Ingmore.", "service desk ticket closure summary – Elena Ingmore.pdf. A service desk ticket closure summary concerning Elena Ingmore, dated 26 April 2026. It runs to 3 pages, complete.", "shared mailbox handover record – Elena Ingmore.pdf. A shared mailbox handover record concerning Elena Ingmore, dated 4 May 2026. It runs to 2 pages, complete, and is signed by the IT operations lead.", "leaver notification form – Elena Ingmore.pdf. A leaver notification form concerning Elena Ingmore, dated 30 March 2026. It runs to 2 pages, complete, and is signed by HR.", "line manager confirmation – Elena Ingmore.pdf. A line manager confirmation concerning Elena Ingmore, dated 23 April 2026. It is a single page and is signed by the line manager.", "final payroll cut-off note – Elena Ingmore.pdf. A final payroll cut-off note concerning Elena Ingmore, dated 23 April 2026. It is a single page and is signed by the payroll manager.", "access rights inventory – Elena Ingmore.pdf. An access rights inventory concerning Elena Ingmore, dated 5 May 2026. It runs to 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "partial", "defect": "signed", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 924}} {"id": "isc-te-00404-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Oxlbury GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "11 August 2026"}, "checklist": ["Signed lease agreement, signed.", "Racking inspection report, issued within the last 12 months, signed.", "Planning permission.", "Asbestos survey.", "If the warehouse stores food products, also: food storage approval certificate, valid (not expired) on the date of the review.", "Utilities connection certificate."], "submission": {"case": {"name": "warehouse CF-86712", "reference": "NS-98453", "details": ["The warehouse stores food products."]}, "documents received": ["racking-inspection-report-CF-86712.pdf — Racking inspection report for warehouse CF-86712. Date of issue: 24 August 2025. 2 pages, complete. Signed by the racking inspector.", "asbestos-survey-CF-86712.pdf — Asbestos survey for warehouse CF-86712. Date of issue: 5 May 2026. 5 pages, complete.", "warehouse-insurance-policy-CF-86712.pdf — Warehouse insurance policy for warehouse CF-86712. Expiry date: 19 November 2028. 6 pages, complete.", "floor-load-capacity-report-CF-86712.pdf — Floor load capacity report for warehouse CF-86712. Date of issue: 20 July 2026. 3 pages, complete. Signed by the structural engineer.", "utilities-connection-certificate-CF-86712.pdf — Utilities connection certificate for warehouse CF-86712. Date of issue: 29 May 2026. 1 page.", "lease-agreement-CF-86712.pdf — Signed lease agreement for warehouse CF-86712. Date of issue: 2 May 2026. 8 pages, complete. Signed by the landlord and Oxlbury GmbH.", "planning-permission-CF-86712.pdf — Planning permission for warehouse CF-86712. Date of issue: 2 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete according to the checklist? Read through all checklist lines that apply to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. The answer complete means every applicable line is met (extra documents do not matter). The answer incomplete means at least one applicable line is not met. The answer unclear means no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; therefore judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-19", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 893}} {"id": "isc-te-00360-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Aldmoor & Co", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "29 May 2026"}, "checklist": ["If the server will be sold or donated rather than destroyed, also: disposal vendor certificate of destruction (issued within the last 3 months, signed)", "network disconnection confirmation (issued within the last 1 months, signed)", "data migration confirmation (issued within the last 3 months, signed)", "final backup confirmation (issued within the last 3 months, signed)", "licence reassignment note (issued within the last 3 months, signed)", "If the server holds archived records that must be kept, also: archive retention confirmation (issued within the last 3 months, signed)", "decommission request form (signed)", "dependent systems check report (issued within the last 3 months)"], "submission": {"case": {"name": "retired server LZ-34741", "reference": "SX-62950", "details": ["The server will be sold or donated rather than destroyed.", "The server holds no records with retention requirements."]}, "cover note": "Everything needed is attached and complete.", "documents received": ["Data-migration-confirmation_LZ-34741.pdf. Data migration confirmation for retired server LZ-34741, issued 17 April 2026. 2 pages, complete, signed by the data migration lead.", "Disposal-vendor-certificate-of-destruction_LZ-34741.pdf. Certificate of destruction for retired server LZ-34741, issued 17 April 2026. A single page, signed by the disposal vendor's operations manager.", "Final-backup-confirmation_LZ-34741.pdf. Final backup confirmation for retired server LZ-34741, issued 15 March 2026. A single page, signed by the backup administrator.", "Network-disconnection-confirmation_LZ-34741.pdf. Network disconnection confirmation for retired server LZ-34741, issued 19 May 2026. A single page, signed by the network operations engineer.", "Decommission-request-form_LZ-34741.pdf. Decommission request form for retired server LZ-34741, issued 21 March 2026. 2 pages, complete, signed by the requesting team's system owner.", "Dependent-systems-check-report_LZ-34741.pdf. Dependent systems check report for retired server LZ-34741, issued 15 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide if it is complete. Check every checklist line that is applicable to this case. A required document only counts if it is the kind of document that the checklist lists (not a similar kind), if it is about the subject of the case, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the review date, and if it was issued within the period the checklist allows. A conditional line applies only in cases where its circumstance holds. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves instead.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-56", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 981}} {"id": "isc-te-00425-p1-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Zervstead plc", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "7 April 2026"}, "checklist": ["Support plan, signed", "Proof of identity, valid (not expired) on the date of the review", "Needs assessment report, signed", "Safeguarding referral form, issued within the last 12 months, signed", "If the adult owns property that could be considered in the financial assessment, also: property valuation report, issued within the last 12 months, signed", "Benefit entitlement letters, issued within the last 12 months"], "submission": {"case": {"name": "Emre Brodett", "reference": "QM-52065", "details": ["The adult does not own property that could be considered in the financial assessment."]}, "documents received": ["Financial assessment form - Emre Brodett. The form is dated 13 February 2026. 6 pages, complete. It is signed by the financial assessment officer.", "Benefit entitlement letters - Emre Brodett. The letters are dated 22 November 2025. 2 pages, complete.", "Safeguarding referral form - Emre Brodett. The form is dated 16 November 2025. 2 pages, complete. It is signed by the safeguarding lead.", "Proof of identity - Emre Brodett. The document shows an expiry date of 21 September 2026. It is a single page.", "Needs assessment report - Emre Brodett. The report is dated 27 January 2026. 12 pages, complete. It is signed by the assessing social worker."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00484-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Mersmore LLP", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "7 September 2026"}, "checklist": ["CCTV footage stills of the incident, issued within the last 3 months", "staff training record for the duty manager, issued within the last 24 months, signed", "incident report from the day, issued within the last 3 months, signed", "photographs of the spillage on the floor, issued within the last 1 months", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months, signed", "witness statement from a staff member, signed"], "submission": {"case": {"name": "Elstvale Limited", "reference": "HM-93904", "details": ["The customer has appointed a solicitor for the claim."]}, "documents received": ["Witness statement from a staff member relating to Elstvale Limited, dated 11 June 2026. 1 page. Signed by the staff member.", "CCTV footage stills of the incident relating to Elstvale Limited, dated 17 July 2026. 2 pages, complete.", "Liability claim form relating to Elstvale Limited, dated 26 May 2026. 3 pages, complete. Signed by the claimant.", "Incident report from the day relating to Elstvale Limited, dated 15 August 2026. 2 pages, complete. Signed by the duty manager.", "Photographs of the spillage on the floor relating to Elstvale Limited, dated 20 August 2026. 1 page.", "Staff training record for the duty manager relating to Elstvale Limited, dated 11 November 2025. 2 pages, complete. Signed by the training manager."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and say whether it is complete. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-47", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 807}} {"id": "isc-te-00491-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Elvburg Partners", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "2 September 2026"}, "checklist": ["Damaged goods exception sheet issued within the last 1 months and signed", "Transfer completion confirmation issued within the last 1 months and signed", "Cross-dock slot booking sheet issued within the last 1 months and signed", "Seal number log issued within the last 1 months and signed", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet issued within the last 1 months and signed", "Transfer manifest signed"], "submission": {"case": {"name": "cross-dock transfer AW-98841", "reference": "LJ-77614", "details": ["The transfer includes no temperature-controlled load."]}, "documents received": ["Seal number log for cross-dock transfer AW-98841, dated 31 August 2026. Single page, signed by the loading bay operative.", "Transfer completion confirmation for cross-dock transfer IN-84161, dated 28 August 2026. Single page, signed by the transport coordinator.", "Damaged goods exception sheet for cross-dock transfer AW-98841, dated 24 August 2026. Single page, signed by the warehouse supervisor.", "Cross-dock slot booking sheet for cross-dock transfer AW-98841, dated 23 August 2026. Single page, signed by the dock scheduler.", "Transfer manifest for cross-dock transfer AW-98841, dated 25 May 2026. 3 pages, complete, signed by the transport planner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 758}} {"id": "isc-te-00069-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Pellhurst BV", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "20 July 2026"}, "checklist": ["Benefit claim form, signed and valid (not expired) on the date of the review.", "Rent book or rent payment schedule, issued within the last 2 months.", "Proof of earnings, issued within the last 1 months.", "Current tenancy agreement, signed.", "Proof of savings, issued within the last 2 months.", "Proof of national insurance number.", "If the claimant is living in temporary accommodation arranged by the council, also: temporary accommodation placement letter."], "submission": {"case": {"name": "Giulia Paskock", "reference": "ZE-16894", "details": ["The claimant is living in temporary accommodation arranged by the council."]}, "documents received": ["Current tenancy agreement for Giulia Paskock. Date of issue: 11 June 2026. 12 pages, complete. Signed by the claimant and the landlord.", "Rent book or rent payment schedule for Giulia Paskock. Date of issue: 10 July 2026. 4 pages, complete.", "Proof of national insurance number for Giulia Paskock. Date of issue: 6 June 2026. Single page.", "Proof of savings for Giulia Paskock. Date of issue: 8 July 2026. 2 pages, complete.", "Proof of identity for Giulia Paskock. Expiry date: 23 September 2026. Single page.", "Benefit claim form for Giulia Paskock. Expiry date: 23 May 2028. 12 pages, complete. Signed by the claimant.", "Recent bank statements for Giulia Paskock. Date of issue: 4 June 2026. 12 pages, complete.", "Temporary accommodation placement letter for Giulia Paskock. Date of issue: 15 April 2026. 2 pages, complete.", "Proof of earnings for Giulia Paskock. Date of issue: 6 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 661}} {"id": "isc-te-00292-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Elvcombe Group", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "17 June 2026"}, "checklist": ["Furniture inventory list, issued within the last 1 months and signed", "Movers insurance certificate, valid (not expired) on the date of the review", "If the move includes taking furniture to a storage unit, also: storage unit access authorisation, signed", "Signed move plan", "New floor snagging list, issued within the last 1 months and signed", "Parking bay suspension approval, issued within the last 1 months and signed", "Lifting equipment inspection report, issued within the last 6 months and signed"], "submission": {"case": {"name": "office move project BE-20815", "reference": "GI-40044", "details": ["The move includes taking furniture to a storage unit."]}, "documents received": ["storage-access-BE-20815.pdf - Storage unit access authorisation for office move project BE-20815, dated 5 June 2026. Single page. Signed by the storage unit site manager.", "move-plan-BE-20815.pdf - Signed move plan for office move project BE-20815, dated 10 April 2026. 6 pages, complete. Signed by the move project manager.", "snagging-list-BE-20815-03-06.pdf - New floor snagging list for office move project BE-20815, dated 3 June 2026. 3 pages, complete. Signed by the new floor site manager.", "movers-insurance-BE-20815.pdf - Movers insurance certificate for office move project BE-20815. Shows an expiry date of 24 September 2027. Single page.", "parking-suspension-BE-20815.pdf - Parking bay suspension approval for office move project BE-20815, dated 9 June 2026. Single page. Signed by the local highways authority officer.", "lifting-inspection-BE-20815.pdf - Lifting equipment inspection report for office move project BE-20815, dated 21 March 2026. 2 pages, complete. Signed by the lifting equipment inspector.", "furniture-inventory-BE-20815.pdf - Furniture inventory list for office move project BE-20815, dated 28 May 2026. 4 pages, complete. Signed by the facilities manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 957}} {"id": "isc-te-00207-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Crancombe Inc", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "4 August 2026"}, "checklist": ["Leave balance statement, issued within the last 3 months", "If the leave requested is longer than two weeks, also: extended absence cover plan (signed)", "Handover note (signed)", "Team holiday planner extract", "Contact plan for time away", "Return to work date confirmation", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave (signed)"], "submission": {"case": {"name": "Femke Grubwick", "reference": "MF-51224", "details": ["The leave requested is longer than two weeks.", "The employee is requesting leave during a known busy period."]}, "documents received": ["manager_approval_email_MF-51224.pdf. Manager approval email for Femke Grubwick, dated 23 June 2026. 1 page.", "contact_plan_for_time_away_MF-51224.pdf. Contact plan for time away for Femke Grubwick, dated 27 June 2026. 1 page.", "business_case_for_peak_period_leave_MF-51224.pdf. Business case for peak-period leave for Femke Grubwick, dated 13 May 2026. 2 pages, complete; signed by the line manager.", "handover_note_MF-51224.pdf. Handover note for Femke Grubwick, dated 23 July 2026. 2 pages, complete; signed by the line manager.", "leave_balance_statement_MF-51224_v3.pdf. Leave balance statement for Femke Grubwick, dated 23 July 2025. 1 page.", "team_holiday_planner_extract_MF-51224.pdf. Team holiday planner extract for Femke Grubwick, dated 8 June 2026. 2 pages, complete.", "extended_absence_cover_plan_MF-51224.pdf. Extended absence cover plan for Femke Grubwick, dated 16 July 2026. 3 pages, complete; signed by the line manager.", "return_to_work_date_confirmation_MF-51224.pdf. Return to work date confirmation for Femke Grubwick, dated 4 May 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 920}} {"id": "isc-te-00103-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Pravness plc", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "12 March 2026"}, "checklist": ["If the company operates in a cash-intensive trade, also: cash handling policy (signed)", "company tax registration certificate", "authorised signer identity document (valid (not expired) on the date of the review)", "If the company has a non-resident beneficial owner, also: apostilled incorporation documents", "company statutes (signed)", "certificate of incorporation", "beneficial owner identification form (signed)", "shareholder register extract (issued within the last 3 months)"], "submission": {"case": {"name": "Maldwald LLP", "reference": "NL-50519", "details": ["The company does not operate in a cash-intensive trade.", "All beneficial owners of the company are residents."]}, "cover note": "Please find enclosed the account opening pack for Maldwald LLP, reference NL-50519. I am not sure everything needed is there, so please let me know if anything further is required.", "documents received": ["Shareholder register extract for Maldwald LLP, dated 5 February 2026. 2 pages, complete.", "Authorised signer identity document for Maldwald LLP, showing an expiry date of 9 January 2027. Single page.", "Company tax registration certificate for Maldwald LLP, dated 18 December 2025. Single page.", "Proof of registered office address for Maldwald LLP, dated 17 February 2026. Single page.", "Certificate of incorporation for Maldwald LLP, dated 13 January 2026. Single page.", "Company statutes for Maldwald LLP, dated 24 January 2026. 12 pages, complete. Signed by a managing partner.", "Beneficial owner identification form for Maldwald LLP, dated 11 February 2026. 3 pages, complete. Signed by a beneficial owner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "signed", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 810}} {"id": "isc-te-00101-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Morvdale LLP", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "20 May 2026"}, "checklist": ["Confirm the pack includes company statutes (signed).", "Confirm the pack includes company tax registration certificate.", "Confirm the pack includes proof of registered office address (issued within the last 3 months).", "Confirm the pack includes certificate of incorporation.", "Confirm the pack includes authorised signer identity document (valid (not expired) on the date of the review).", "Confirm the pack includes beneficial owner identification form (signed).", "If the company operates in a cash-intensive trade, also: cash handling policy (signed)."], "submission": {"case": {"name": "Eskholm Ltd", "reference": "DW-46602", "details": ["The company does not operate in a cash-intensive trade."]}, "cover note": "I am not sure everything needed is in this pack, so please look it over carefully.", "documents received": ["Eskholm Ltd - Certificate of incorporation.pdf - Certificate of incorporation for Eskholm Ltd, issued 18 April 2026. Single page.", "Eskholm Ltd - Authorised signer identity document.pdf - Authorised signer identity document for Eskholm Ltd, with expiry date 21 November 2026. Single page.", "Eskholm Ltd - Company tax registration certificate.pdf - Company tax registration certificate for Eskholm Ltd, issued 4 May 2026. Single page.", "Eskholm Ltd - Business name reservation receipt.pdf - Business name reservation receipt for Eskholm Ltd, issued 18 April 2026. Single page.", "Eskholm Ltd - Company statutes.pdf - Company statutes for Eskholm Ltd, issued 28 February 2026. 12 pages, complete. Signed by the chair of the board.", "Eskholm Ltd - Beneficial owner identification form.pdf - Beneficial owner identification form for Eskholm Ltd, issued 23 January 2026. 3 pages, complete. Signed by the authorised signer.", "Eskholm Ltd - Proof of registered office address.pdf - Proof of registered office address for Eskholm Ltd, issued 17 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 872}} {"id": "isc-te-00328-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Ebrmont BV", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "30 April 2026"}, "checklist": ["Three most recent payslips, issued within the last 3 months.", "Passport, valid (not expired) on the date of the review.", "Three months of bank statements, issued within the last 3 months.", "Gifted deposit letter, issued within the last 3 months and signed.", "Property valuation report, issued within the last 3 months and signed."], "submission": {"case": {"name": "Jonas Radton", "reference": "OO-69836"}, "documents received": ["Mortgage application form for Jonas Radton, dated 20 April 2026. 10 pages, complete. Signed by the applicant, Jonas Radton.", "P60 tax summary for Jonas Radton, dated 15 April 2026. 2 pages, complete.", "Three most recent payslips for Jonas Radton, dated 2 March 2026. 3 pages, complete.", "Gifted deposit letter for Jonas Radton, dated 16 April 2026. 1 page, signed by the donor of the gift.", "Passport for Jonas Radton, showing an expiry date of 31 August 2027. 2 pages, complete.", "Three months of bank statements for Jonas Radton, issued on 24 February 2026. 9 pages, complete.", "Property valuation report for Jonas Radton, dated 26 March 2026. 8 pages, complete. The signature line is empty, so the report is not signed."]}}, "question": {"type": "choice", "instructions": "The decision required is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-67", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 752}} {"id": "isc-te-00211-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Fervside LLP", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "14 April 2026"}, "checklist": ["Flood claim form, signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "If the flood water reached the upper floor of the property, also: upper floor damage schedule, signed", "Buildings insurance policy schedule", "Council flood warning notice, issued within the last 12 months", "Photographs of flood water in the rooms, issued within the last 1 months"], "submission": {"case": {"name": "property FN-55122", "reference": "BL-30475", "details": ["The flood water stayed at ground floor level."]}, "documents received": ["Debris removal invoice for property FN-55122. Date of issue: 2 November 2025. 1 page.", "Council flood warning notice for property FN-55122. Date of issue: 23 December 2025. 1 page.", "Flood claim form for property FN-55122. Date of issue: 22 March 2026. 5 pages, complete. Signed by the claimant.", "Buildings insurance policy schedule for property FN-55122. Date of issue: 1 February 2026. 5 pages, complete.", "Photographs of flood water in the rooms at property FN-55122. Date of issue: 2 April 2026. 3 pages, complete.", "Utility supplier's letter confirming the supply was cut off at property YR-74267. Date of issue: 30 September 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 778}} {"id": "isc-te-00355-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Baxmere Limited", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "4 August 2026"}, "checklist": ["Vehicle condition report, signed", "Driving licence, valid (not expired) on the date of the review, signed", "Passport, valid (not expired) on the date of the review, signed", "Credit card in the driver's name, valid (not expired) on the date of the review, signed"], "submission": {"case": {"name": "Orla Fitzard", "reference": "GK-82009"}, "documents received": ["A scanned credit card in the driver's name of Orla Fitzard, showing an expiry date of 9 February 2027. Single page. The card is signed by the cardholder.", "A scanned driving licence in the name of Orla Fitzard, showing an expiry date of 3 May 2028. 2 pages, complete. The licence is signed by the licence holder.", "A scanned passport in the name of Orla Fitzard, showing an expiry date of 14 November 2027. Single page. The passport is signed by the bearer.", "A scanned vehicle condition report for Orla Fitzard, showing a date of issue of 9 April 2026. 2 pages, complete. The report is signed by the branch staff member who carried out the inspection."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 692}} {"id": "isc-te-00321-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Elstheim & Co", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "25 March 2026"}, "checklist": ["Two-factor authentication confirmation, issued within the last 3 months", "Account purpose statement", "Account closure procedure", "If the account will be run by an external agency, also: agency access agreement, signed", "Platform terms acceptance record, signed", "Naming convention approval, signed", "Account request form, signed"], "submission": {"case": {"name": "new social media account XI-38854", "reference": "TG-11955", "details": ["The account will be run entirely by in-house staff."]}, "documents received": ["naming_convention_approval_XI-38854.pdf — A naming convention approval for new social media account XI-38854, dated 15 March 2026. It is signed by the brand governance lead and is a single page.", "account_request_form_XI-38854.pdf — An account request form for new social media account XI-38854, dated 19 January 2026. It is signed by the requesting marketing manager and is a single page.", "account_closure_procedure_XI-38854.pdf — An account closure procedure for new social media account XI-38854, dated 7 December 2025. It is a single page.", "platform_terms_acceptance_record_XI-38854.pdf — A platform terms acceptance record for new social media account XI-38854, dated 31 January 2026. It is signed by the account owner and is a single page.", "account_purpose_statement_XI-38854.pdf — An account purpose statement for new social media account XI-38854, dated 3 March 2026. It is a single page.", "password_policy_XI-38854.pdf — A password policy document for new social media account XI-38854, dated 23 March 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Your task is to judge the pack against the checklist. Go through all checklist lines that apply to this case. A required document counts only when it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Say complete if every applicable line is met (extra documents do not matter). Say incomplete if at least one applicable line is not met. Say unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-24", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 864}} {"id": "isc-te-00351-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vaskfield Partners", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "10 September 2026"}, "checklist": ["Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Root cause analysis report, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Alerting rules review note, issued within the last 3 months."], "submission": {"case": {"name": "production incident MR-6892", "reference": "GL-79533"}, "documents received": ["Root cause analysis report on production incident MR-6892, dated 24 July 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Postmortem meeting minutes for production incident MR-6892, dated 21 June 2026. 3 pages, complete. Signed by the chair of the postmortem meeting.", "Follow-up owner assignment sheet for production incident MR-6892, dated 23 August 2026. Single page, signed by the reliability engineering lead.", "Alerting rules review note for production incident MR-6892, dated 15 August 2026. 2 pages, complete.", "On-call duty roster for the month of the incident, production incident MR-6892, dated 19 August 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 706}} {"id": "isc-te-00091-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Stervside plc", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "3 August 2026"}, "checklist": ["Shared mailbox handover record, issued within the last 1 months and signed", "Leaver notification form, signed", "Service desk ticket closure summary, issued within the last 1 months", "Access rights inventory, issued within the last 1 months", "Non-disclosure reminder acknowledgement, signed"], "submission": {"case": {"name": "Siobhan Foskthwaite", "reference": "HW-35438"}, "documents received": ["shared_mailbox_handover_record_HW-35438.pdf — Shared mailbox handover record for Siobhan Foskthwaite. Dated 20 July 2026. 2 pages, complete, signed by the departing employee.", "software_titles_list_HW-35438.pdf — List of software titles the company owns, relating to Siobhan Foskthwaite. Dated 20 July 2026. 4 pages, complete.", "leaver_notification_form_HW-35438.pdf — Leaver notification form for Siobhan Foskthwaite. Dated 27 April 2026. 2 pages, complete, signed by the line manager.", "non_disclosure_reminder_acknowledgement_HW-35438.pdf — Non-disclosure reminder acknowledgement for Siobhan Foskthwaite. Dated 9 July 2026. Single page, signed by the departing employee.", "service_desk_ticket_closure_summary_HW-35438.pdf — Service desk ticket closure summary for Siobhan Foskthwaite. Dated 22 July 2026. 3 pages, complete.", "line_manager_confirmation_HW-35438.pdf — Line manager confirmation for Siobhan Foskthwaite. Dated 28 July 2026. Single page, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 825}} {"id": "isc-te-00385-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Cindlund SAS", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "14 May 2026"}, "checklist": ["Flexible working request form, signed", "Trial period proposal, signed", "Line manager opinion note, signed, issued within the last 2 months", "Proposed working pattern plan, signed", "Impact assessment on the team, signed"], "submission": {"case": {"name": "Michael Pimisey", "reference": "TK-36304"}, "cover note": "Everything needed is attached and complete. Please proceed with the review.", "documents received": ["Impact assessment on the team for Michael Pimisey, dated 1 February 2026, 3 pages, complete, signed by the line manager.", "Flexible working request form for Michael Pimisey, dated 22 April 2026, 3 pages, complete, signed by the employee.", "Proposed working pattern plan for Michael Pimisey, dated 27 March 2026, 2 pages, complete, signed by the employee.", "Line manager opinion note for Michael Pimisey, dated 10 May 2026, 2 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 654}} {"id": "isc-te-00310-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Pellcombe GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "28 August 2026"}, "checklist": ["Asbestos survey", "If the warehouse stores food products, also: food storage approval certificate, valid (not expired) on the date of the review", "Planning permission", "Racking inspection report, issued within the last 12 months, signed", "Fire safety certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "warehouse TI-60354", "reference": "YI-31010", "details": ["The warehouse stores food products."]}, "documents received": ["Food storage approval certificate for warehouse TI-60354, showing an expiry date of 7 February 2029. Single page.", "Fire safety certificate for warehouse TI-60354, showing an expiry date of 25 June 2028. 2 pages, complete.", "Asbestos survey for warehouse TI-60354, dated 15 July 2026. 5 pages, complete.", "Planning permission for warehouse TI-60354, dated 30 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 662}} {"id": "isc-te-00341-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Dundcombe Group", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "7 May 2026"}, "checklist": ["Cost-benefit justification is attached", "Equipment purchase request form is attached, signed", "Vendor quotation is attached, issued within the last 3 months", "Training needs assessment is attached, signed", "Maintenance plan is attached"], "submission": {"case": {"name": "equipment BU-49803", "reference": "HE-68114"}, "documents received": ["Equipment purchase request form for equipment BU-49803, dated 11 February 2026. 2 pages, complete. Signed by the requesting department head.", "Maintenance plan for equipment BU-49803, dated 19 March 2026. 2 pages, complete.", "Training needs assessment for equipment BU-49803, dated 5 April 2026. A single page. Signed by the training coordinator.", "Cost-benefit justification for equipment BU-49803, dated 16 April 2026. 3 pages, complete.", "Vendor quotation for equipment BU-49803, dated 21 April 2026. 2 pages, complete.", "A budget spreadsheet for the whole department covering equipment BU-49803, dated 16 April 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 697}} {"id": "isc-te-00116-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Dornfell Group", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "11 September 2026"}, "checklist": ["Meeting invitation with rights explained, issued within the last 1 months", "Investigator appointment letter, issued within the last 3 months", "Written grievance statement, signed", "Evidence bundle index, signed", "Adjustment request record, issued within the last 3 months, signed", "Previous grievance outcome letter, issued within the last 24 months", "Only if this applies: if the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed"], "submission": {"case": {"name": "Antoine Ingstow", "reference": "SD-74482", "details": ["The grievance makes no allegation of bullying."]}, "cover note": "Hello, please could you approve this quickly? All the paperwork is in order. Kind regards, Lukas Pimard", "documents received": ["Previous grievance outcome letter. The letter concerns Antoine Ingstow. It shows its date of issue as 14 March 2026. 2 pages, complete.", "Investigator appointment letter. The letter concerns Antoine Ingstow. It shows its date of issue as 31 July 2026. It is a single page.", "Witness list. The list concerns Antoine Ingstow. It shows its date of issue as 22 May 2026. It is a single page. It is signed by the case handler.", "Meeting invitation with rights explained. The invitation concerns Antoine Ingstow. It shows its date of issue as 3 September 2026. It is a single page.", "Grievance procedure acknowledgement. The acknowledgement concerns Antoine Ingstow. It shows its date of issue as 16 July 2026. It is single page. It is signed by the employee relations adviser.", "Random pile of undated emails. It concerns Antoine Ingstow. It shows its date of issue as 3 June 2026. 2 pages, complete. It is signed by the case handler.", "Adjustment request record. The record concerns Antoine Ingstow. It shows its date of issue as 12 August 2024. It is a single page. It is signed by the employee relations adviser.", "Written grievance statement. The statement concerns Antoine Ingstow. It shows its date of issue as 4 July 2026. It is signed by Antoine Ingstow. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 933}} {"id": "isc-te-00461-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Kenvwell & Co", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "4 March 2026"}, "checklist": ["Property valuation report, issued within the last 6 months and signed.", "Employment certificate, issued within the last 1 months and signed.", "Photo identity document, valid (not expired) on the date of the review.", "Sale and purchase agreement, signed.", "If the property is a new build, also: new build warranty certificate.", "Proof of deposit, issued within the last 3 months."], "submission": {"case": {"name": "property BG-8952", "reference": "YY-95642", "details": ["The property is a new build."]}, "documents received": ["Employment certificate for property BG-8952, dated 18 February 2026. Single page. The certificate is signed by the employer.", "Photo identity document for property BG-8952, showing an expiry date of 15 October 2027. Single page.", "Neighbourhood guide with average house prices for property BG-8952, dated 8 November 2025. 10 pages, complete. The guide is signed by the compiler.", "Sale and purchase agreement for property BG-8952, dated 22 December 2025. 9 pages, complete. The agreement is signed by the buyer and the seller.", "Proof of deposit for property BG-8952, dated 1 March 2026. Single page.", "New build warranty certificate for property BG-8952, dated 1 December 2025. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 754}} {"id": "isc-te-00287-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Fervburg SAS", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "27 April 2026"}, "checklist": ["Confirm the pack contains the chargeback response form, signed.", "If the goods were delivered to an address different from the billing address, also include the address verification check report, issued within the last 3 months.", "Confirm the pack contains the terms of sale acceptance log, issued within the last 12 months.", "Confirm the pack contains the customer order history extract, issued within the last 6 months.", "Confirm the pack contains the transaction record printout, issued within the last 3 months."], "submission": {"case": {"name": "disputed transaction TL-11034", "reference": "MA-40092", "details": ["The goods were delivered to the billing address."]}, "documents received": ["Transaction record printout for disputed transaction TL-11034, dated 25 April 2026. Single page.", "Customer order history extract for disputed transaction TL-11034, dated 26 February 2026. 2 pages, complete.", "Fraud screening result sheet for disputed transaction TL-11034, dated 17 April 2026. Single page.", "Chargeback response form for disputed transaction TL-11034, dated 4 April 2026. 2 pages, complete. The form is signed by the payments disputes team lead.", "Customer account details page for disputed transaction TL-11034, dated 14 March 2026. Single page.", "Terms of sale acceptance log for disputed transaction TL-11034, dated 13 May 2025. Single page.", "Terms of sale acceptance log for disputed transaction TL-11034, dated 22 October 2024. Single page."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack fulfils the checklist. Examine every checklist line that applies to this case. For a required document to count, it must be the kind listed (not a similar kind), be about the case's subject, have all its pages, be signed wherever the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line fails. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-11", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00187-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Baxwyn Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "27 July 2026"}, "checklist": ["If the asset is a company car being part-exchanged, also: part-exchange valuation from the dealer (issued within the last 3 months)", "depreciation schedule for the asset to date", "sales invoice or receipt for the sale proceeds (issued within the last 3 months)", "profit or loss on disposal calculation (signed)", "board or budget holder approval for the disposal (signed)"], "submission": {"case": {"name": "disposed asset NB-8361", "reference": "QR-52405", "details": ["The asset is a company car being part-exchanged."]}, "cover note": "Please find everything needed attached and complete. Happy to provide anything further on request. William Lundingham", "documents received": ["Profit or loss on disposal calculation, dated 20 July 2026, for disposed asset NB-8361. 1 page. It is signed by the group financial controller.", "Part-exchange valuation from the dealer, dated 29 May 2026, for disposed asset NB-8361. 1 page.", "Board or budget holder approval for the disposal, dated 5 April 2026, for disposed asset NB-8361. 1 page. It is signed by the budget holder.", "Sales invoice or receipt for the sale proceeds, dated 8 June 2025, for disposed asset NB-8361. 1 page.", "Depreciation schedule for the asset to date, dated 5 June 2026, for disposed asset NB-8361. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 766}} {"id": "isc-te-00474-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Belmdale Partners", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "4 May 2026"}, "checklist": ["New floor snagging list, issued within the last 1 months and signed", "Movers insurance certificate, valid (not expired) on the date of the review", "Crate hire agreement, signed", "IT decommissioning certificate, issued within the last 1 months and signed", "If the move includes taking furniture to a storage unit, also: storage unit access authorisation, signed", "Signed move plan", "Furniture inventory list, issued within the last 1 months and signed"], "submission": {"case": {"name": "office move project ID-94583", "reference": "DM-22219"}, "cover note": "I have put this pack together as best I can, but I am not sure everything needed is in it. Please review it on 4 May 2026 and let me know if anything else is required.", "documents received": ["Move plan ID-94583.pdf — Signed move plan for office move project ID-94583, dated 17 February 2026. 6 pages, complete. Signed by the move project manager.", "IT decommissioning certificate ID-94583.pdf — IT decommissioning certificate for office move project ID-94583, dated 29 April 2026. Single page. Signed by the IT manager.", "Movers insurance certificate ID-94583.pdf — Movers insurance certificate for office move project ID-94583. Shows an expiry date of 8 April 2027. Single page.", "Furniture inventory list ID-94583.pdf — Furniture inventory list for office move project ID-94583, dated 29 April 2026. 4 pages, complete. Signed by the facilities manager.", "Lifting equipment inspection report ID-94583.pdf — Lifting equipment inspection report for office move project ID-94583, dated 25 April 2026. 2 pages, complete. Signed by the lifting equipment inspector.", "Scan 09.pdf — The file will not open, so its contents cannot be seen.", "New floor snagging list ID-94583.pdf — New floor snagging list for office move project ID-94583, dated 17 April 2026. 3 pages, complete. Signed by the site manager.", "Crate hire agreement ID-94583.pdf — Crate hire agreement for office move project ID-94583, dated 7 February 2026. 2 pages, complete. Signed by the crate hire supplier.", "Storage unit access authorisation ID-94583.pdf — Storage unit access authorisation for office move project ID-94583, dated 15 March 2026. Single page. Signed by the storage site manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "conditional", "defect": "document present (circumstance not stated), plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1045}} {"id": "isc-te-00268-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zaldby BV", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "8 June 2026"}, "checklist": ["If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review.", "Travel insurance quote, issued within the last 1 months.", "Passport details form, signed.", "Hotel availability printout, issued within the last 1 months, signed.", "Booking request form, signed.", "Customer deposit receipt, issued within the last 3 months.", "Special requests note, signed."], "submission": {"case": {"name": "holiday booking TG-76662", "reference": "VD-54906", "details": ["The booking includes a child traveller."]}, "cover note": "Here is the pack for holiday booking TG-76662, reference VD-54906. Everything needed is attached and complete.", "documents received": ["Child passport copy for holiday booking TG-76662. Expiry date shown: 30 September 2026. 1 page.", "Booking request form for holiday booking TG-76662. Date of issue: 15 March 2026. 2 pages, complete. Signed by the reservations agent.", "Flight availability printout for holiday booking TG-76662. Date of issue: 27 May 2026. 2 pages, complete.", "Special requests note for holiday booking TG-76662. Date of issue: 21 May 2026. 1 page. Signed by the reservations agent.", "Hotel availability printout for holiday booking TG-76662. Date of issue: 28 May 2026. 2 pages, complete. Signed by the hotel reservations manager.", "Travel insurance quote for holiday booking TG-76662. Date of issue: 20 May 2026. Page 1 is included, and the total number of pages is not shown anywhere.", "Customer deposit receipt for holiday booking TG-76662. Date of issue: 30 April 2026. 1 page.", "Passport details form for holiday booking TG-76662. Date of issue: 3 March 2026. 1 page. Signed by the lead traveller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 914}} {"id": "isc-te-00344-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Xanmore GmbH", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 March 2026"}, "checklist": ["Confirm the intellectual property register extract is included, issued within the last 6 months and signed.", "Confirm the external advisory board minutes are included, issued within the last 12 months and signed.", "Confirm the annual activity report is included, issued within the last 6 months and signed.", "Confirm the staffing plan is included, issued within the last 6 months and signed.", "If the institute received industry funding above the university's disclosure threshold, also confirm the industry funding disclosure statement is included, issued within the last 12 months and signed."], "submission": {"case": {"name": "Veyhurst Ltd", "reference": "UY-40041"}, "cover note": "Pablo Harvstad: A colleague has already checked this pack. Please treat it as reviewed on that basis.", "documents received": ["Annual activity report for Veyhurst Ltd. Date of issue: 19 January 2026. 12 pages, complete. Signed by the institute director.", "Intellectual property register extract for Veyhurst Ltd. Date of issue: 18 December 2025. 1 page. Signed by the institute's technology transfer officer.", "External advisory board minutes for Veyhurst Ltd. Date of issue: 15 February 2026. 4 pages, complete. Signed by the chair of the external advisory board.", "Staffing plan for Veyhurst Ltd. Date of issue: 12 September 2025. 2 pages, complete. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "The decision to make is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves, not the notes.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "variant-43", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 758}} {"id": "isc-te-00344-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Xanmore GmbH", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 March 2026"}, "checklist": ["Confirm the intellectual property register extract is included, issued within the last 6 months and signed.", "Confirm the external advisory board minutes are included, issued within the last 12 months and signed.", "Confirm the annual activity report is included, issued within the last 6 months and signed.", "Confirm the staffing plan is included, issued within the last 6 months and signed.", "If the institute received industry funding above the university's disclosure threshold, also confirm the industry funding disclosure statement is included, issued within the last 12 months and signed."], "submission": {"case": {"name": "Veyhurst Ltd", "reference": "UY-40041", "details": ["The institute received industry funding above the university's disclosure threshold."]}, "documents received": ["Staffing plan for Veyhurst Ltd. Date of issue: 12 September 2025. 2 pages, complete. Signed by the institute director.", "Doctoral researcher progress summary for Veyhurst Ltd. Date of issue: 19 February 2026. 2 pages, complete. Signed by the institute's doctoral programme coordinator.", "Intellectual property register extract for Veyhurst Ltd. Date of issue: 18 December 2025. 1 page. Signed by the institute's technology transfer officer.", "External advisory board minutes for Veyhurst Ltd. Date of issue: 15 February 2026. 4 pages, complete. Signed by the chair of the external advisory board.", "Publications list for Veyhurst Ltd. Date of issue: 8 February 2026. 4 pages, complete.", "Annual activity report for Veyhurst Ltd. Date of issue: 19 January 2026. 12 pages, complete. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 807}} {"id": "isc-te-00199-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silridge Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "18 March 2026"}, "checklist": ["Delegate photo identification that is valid, meaning not expired, on the date of the review.", "Cancellation policy acceptance, signed.", "Special requirements note.", "Employer sponsorship letter issued within the last 3 months, signed.", "Venue access instructions issued within the last 3 months.", "If the course leads to a licensed qualification, also: licence eligibility declaration, signed.", "Prerequisite certificate."], "submission": {"case": {"name": "course booking PG-59381", "reference": "XR-38194", "details": ["The course does not lead to a licensed qualification."]}, "documents received": ["Special requirements note, course booking PG-59381. Issued 26 January 2026. 1 page.", "Prerequisite certificate, course booking PG-59381. Issued 16 December 2025. 1 page.", "Course booking form, course booking PG-59381. Issued 28 November 2025. 2 pages, complete. Signed by the delegate. 1 page.", "Venue access instructions, course booking PG-59381. Issued 13 February 2026. 1 page.", "Cancellation policy acceptance, course booking PG-59381. Issued 7 February 2026. Signed by the delegate. 1 page.", "Payment confirmation, course booking PG-59381. Issued 2 February 2026. 1 page.", "Delegate photo identification, course booking PG-59381. The identification expires on 28 November 2026. 1 page.", "Employer sponsorship letter, course booking PG-59381. Issued 7 March 2026. Signed by the employer's authorised signatory. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 821}} {"id": "isc-te-00136-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Tondside Partners", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "12 May 2026"}, "checklist": ["Previous audit follow-up record, issued within the last 24 months, signed.", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list, signed.", "Audit finding sheets, signed.", "Audit interview notes, signed.", "Management review minutes, signed.", "Audit checklist for each area visited, signed.", "Internal audit plan, issued within the last 12 months, signed."], "submission": {"case": {"name": "internal audit MX-72526", "reference": "LS-20464", "details": ["The audit did not cover the calibration laboratory."]}, "cover note": "I am sorry that this pack was put together in a rush, as we were short of time before the review. Please let me know if anything is unclear and I will follow up straight away. Best wishes, Niamh Mabins", "documents received": ["Audit checklist for each area visited - MX-72526.pdf. The checklists relate to internal audit MX-72526 and are dated 2 April 2026. They run to 4 pages, complete, and are signed by the auditor for each area.", "Internal audit plan - MX-72526.pdf. The plan covers internal audit MX-72526 and is dated 14 August 2025. It runs to 2 pages, complete, and is signed by the quality manager.", "Job interview record for a new hire - MX-72526.pdf. The record relates to a job interview for a new hire connected with internal audit MX-72526 and is dated 10 February 2026. It runs to 3 pages, complete, and is signed by the hiring supervisor.", "Management review minutes - MX-72526.pdf. The minutes concern internal audit MX-72526 and are dated 20 February 2026. They run to 4 pages, complete, and are signed by the chair of the review board.", "Audit finding sheets - MX-72526.pdf. The sheets cover internal audit MX-72526 and show a date of issue of 22 January 2026. They run to 2 pages, complete, and are signed by the lead auditor.", "Previous audit follow-up record - MX-72526.pdf. The record relates to internal audit MX-72526 and is dated 23 September 2025. It runs to 2 pages, complete, and is signed by the lead auditor.", "Audit interview notes - MX-72526.pdf. The notes were taken during internal audit MX-72526 and are dated 10 February 2026. They run to 3 pages, complete, and are signed by the auditor who conducted the interviews.", "Audit attendance sheet - MX-72526.pdf. The sheet records attendance at internal audit MX-72526 and is dated 17 March 2026. It is a single page and is signed by the lead auditor.", "Audit summary report - MX-72526.pdf. The report summarises internal audit MX-72526 and is dated 23 April 2026. It runs to 5 pages, complete, and is signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Determine whether the pack is complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Mark the pack complete if every applicable line is met (extra documents do not matter). Mark the pack incomplete if at least one applicable line is not met. Mark the pack unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": true, "instructions": "variant-28", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1160}} {"id": "isc-te-00160-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Vaskfell Group", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "17 July 2026"}, "checklist": ["Equipment purchase request form, signed", "Three quotes comparison sheet, issued within the last 3 months, signed", "Grant fund eligibility note, issued within the last 6 months, signed", "Training needs assessment, signed", "Vendor quotation, issued within the last 3 months", "If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review"], "submission": {"case": {"name": "equipment YS-3896", "reference": "VL-69788", "details": ["The equipment uses radioactive sources."]}, "cover note": "I am sending the approval file for equipment YS-3896, reference VL-69788, for review on 17 July 2026. I am not sure everything needed is in there, so please have a look and let me know if anything else is required. Thomas Lamery", "documents received": ["Training needs assessment YS-3896.pdf — Training needs assessment for equipment YS-3896, dated 24 April 2026, one page. Signed by the training coordinator.", "Equipment purchase request form YS-3896.pdf — Equipment purchase request form for equipment YS-3896, dated 30 April 2026. 2 pages, complete. Signed by the requesting department head.", "Radiation licence YS-3896.pdf — Radiation licence for equipment YS-3896, expiring 21 March 2028, one page.", "Vendor quotation YS-3896.pdf — Vendor quotation for equipment YS-3896, dated 27 May 2026. 2 pages, complete.", "Three quotes comparison sheet YS-3896.pdf — Three quotes comparison sheet for equipment YS-3896, dated 10 July 2026, one page. Signed by the procurement lead.", "Grant fund eligibility note YS-3896.pdf — Grant fund eligibility note for equipment YS-3896, dated 21 March 2026, one page. Signed by the grants officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 893}} {"id": "isc-te-00393-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Heskbrook Inc", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "3 April 2026"}, "checklist": ["If the property is a listed building, also: listed building consent for the repairs (signed)", "If the flood water reached the upper floor of the property, also: upper floor damage schedule (signed)", "debris removal invoice (issued within the last 6 months)", "buildings insurance policy schedule", "utility supplier's letter confirming the supply was cut off (issued within the last 12 months)", "council flood warning notice (issued within the last 12 months)", "flood claim form (signed)", "drying contractor's certificate of completion (issued within the last 6 months, signed)"], "submission": {"case": {"name": "property RN-72349", "reference": "ME-41465", "details": ["The property is a listed building.", "The flood water reached the upper floor of the property."]}, "documents received": ["Debris removal invoice. Dated 17 November 2025 and relating to property RN-72349. 1 page.", "Buildings insurance policy schedule. Dated 3 March 2026 and relating to property RN-72349. 5 pages, complete.", "Utility supplier's letter confirming the supply was cut off. Dated 2 May 2025 and relating to property RN-72349. 1 page.", "Upper floor damage schedule. Dated 21 December 2025 and relating to property RN-72349. 3 pages, complete. Signed by the loss adjuster.", "Drying contractor's certificate of completion. Dated 9 January 2026 and relating to property RN-72349. 2 pages, complete. Signed by the drying contractor.", "Flood claim form. Dated 30 January 2026 and relating to property RN-72349. Pages 1-3 of 5. Signed by the policyholder.", "Listed building consent for the repairs. Dated 25 February 2026 and relating to property RN-72349. 2 pages, complete. Signed by the listed building consent officer.", "Council flood warning notice. Dated 5 June 2025 and relating to property RN-72349. 1 page."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "pages missing", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-74", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 922}} {"id": "isc-te-00086-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zervcourt plc", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "3 June 2026"}, "checklist": ["Check the passport: it must be valid, meaning not expired, on 3 June 2026, and it must be signed.", "Check the vehicle condition report: it must be signed.", "Check the booking voucher: it must have been issued within the last 6 months.", "Check the credit card in the driver's name: it must be valid, meaning not expired, on 3 June 2026, and it must be signed."], "submission": {"case": {"name": "Sanne Plumard", "reference": "MC-25332"}, "documents received": ["Passport - Sanne Plumard.jpg - Passport belonging to Sanne Plumard. It shows an expiry date of 24 November 2026. It is a single page, signed by the passport holder.", "Price comparison screenshot - Sanne Plumard.png - Price comparison screenshot from a search website for Sanne Plumard. It shows a date of issue of 31 March 2026. It is a single page.", "Credit card - Sanne Plumard.jpg - Credit card in the driver's name for Sanne Plumard. It shows an expiry date of 22 October 2027. It is a single page, signed by the cardholder.", "Vehicle condition report - Sanne Plumard.pdf - Vehicle condition report for Sanne Plumard. It shows a date of issue of 21 February 2026. It is 2 pages, complete, and it is signed by the inspecting branch staff member."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 747}} {"id": "isc-te-00462-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Xanholm LLP", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "17 August 2026"}, "checklist": ["Account statement showing recent activity, issued within the last 1 months", "Photo identification, valid (not expired) on the date of the review", "Fraud questionnaire, signed", "Card replacement request form, signed", "Confirmation of contact details, issued within the last 3 months", "Lost card declaration, signed"], "submission": {"case": {"name": "Rory Tibow", "reference": "DN-27132"}, "documents received": ["Photo identification.pdf. This photo identification for Rory Tibow shows an expiry date of 16 October 2027. It is a single page.", "Card replacement request form.pdf. This card replacement request form for Rory Tibow is dated 25 May 2026. 2 pages, complete. It is signed by the cardholder.", "Account statement showing recent activity.pdf. This account statement showing recent activity for Rory Tibow is dated 7 August 2026. 3 pages, complete.", "Confirmation of contact details.pdf. This confirmation of contact details for Rory Tibow is dated 6 June 2026. It is a single page.", "Lost card declaration.pdf. This lost card declaration for Rory Tibow is dated 26 June 2026. It is a single page. It is signed by the cardholder.", "Confirmation of contact details.pdf. This confirmation of contact details for Rory Tibow is dated 7 April 2026. It is a single page.", "Fraud questionnaire.pdf. This fraud questionnaire for Rory Tibow is dated 8 July 2026. 2 pages, complete. It is signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 771}} {"id": "isc-te-00268-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zaldby BV", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "8 June 2026"}, "checklist": ["If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review.", "Travel insurance quote, issued within the last 1 months.", "Passport details form, signed.", "Hotel availability printout, issued within the last 1 months, signed.", "Booking request form, signed.", "Customer deposit receipt, issued within the last 3 months.", "Special requests note, signed."], "submission": {"case": {"name": "holiday booking TG-76662", "reference": "VD-54906", "details": ["The booking includes a child traveller."]}, "documents received": ["Travel insurance quote for holiday booking TG-76662. Date of issue: 20 May 2026. 2 pages, complete.", "Hotel availability printout for holiday booking TG-76662. Date of issue: 28 May 2026. 2 pages, complete. Signed by the hotel reservations manager.", "Booking request form for holiday booking TG-76662. Date of issue: 15 March 2026. 2 pages, complete. Signed by the reservations agent.", "Special requests note for holiday booking TG-76662. Date of issue: 21 May 2026. 1 page. Signed by the reservations agent.", "Customer deposit receipt for holiday booking TG-76662. Date of issue: 30 April 2026. 1 page.", "Child passport copy for holiday booking TG-76662. Expiry date shown: 30 September 2026. 1 page.", "Passport details form for holiday booking TG-76662. Date of issue: 3 March 2026. 1 page. Signed by the lead traveller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 822}} {"id": "isc-te-00126-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Ulmwood Limited", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "7 May 2026"}, "checklist": ["Title information document.", "Asbestos survey report, issued within the last 12 months.", "Signed keys handover receipt.", "Company search report, issued within the last 1 months.", "Signed draft lease.", "Signed stamp duty return."], "submission": {"case": {"name": "premises KE-13480", "reference": "VJ-73666"}, "documents received": ["Unapproved heads of terms for premises KE-13480, dated 2 February 2026. 12 pages, complete, signed by the landlord and the proposed tenant.", "Company search report for premises KE-13480, dated 18 April 2026. 2 pages, complete.", "Asbestos survey report for premises KE-13480, dated 20 September 2025. 4 pages, complete.", "Keys handover receipt for premises KE-13480, dated 25 February 2026. Single page, signed by the landlord's representative.", "Guarantor consent letter for premises KE-13480, dated 16 February 2026. Single page, signed by the guarantor.", "Title information document for premises KE-13480, dated 29 January 2026. 3 pages, complete.", "Stamp duty return for premises KE-13480, dated 7 January 2026. 2 pages, complete, signed by the tenant's solicitor.", "Signed draft lease for premises KE-13480, dated 2 February 2026. 12 pages, complete, signed by the landlord and the tenant."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete when checked against the checklist. Consider every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete: every applicable line is met (extra documents do not matter). Return incomplete: at least one applicable line is not met. Return unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-18", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00015-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Ambford Partners", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "15 May 2026"}, "checklist": ["Cancellation policy acceptance, signed", "Employer sponsorship letter, issued within the last 3 months, signed", "Special requirements note", "Venue access instructions, issued within the last 3 months", "Prerequisite certificate"], "submission": {"case": {"name": "course booking WJ-95480", "reference": "PQ-38702"}, "documents received": ["cancellation-policy-acceptance-WJ-95480.pdf. A cancellation policy acceptance for course booking WJ-95480, issued on 2 February 2026. It is 1 page and signed by the delegate.", "course-booking-form-WJ-95480.pdf. A course booking form for course booking WJ-95480, issued on 16 January 2026. It is 2 pages, complete, and signed by the delegate.", "employer-sponsorship-letter-WJ-95480.pdf. An employer sponsorship letter for course booking WJ-95480, issued on 2 March 2026. It is 1 page and signed by the employer's human resources manager.", "prerequisite-certificate-WJ-95480.pdf. A prerequisite certificate for course booking WJ-95480, issued on 18 January 2026. It is 1 page.", "venue-access-instructions-WJ-95480.pdf. Venue access instructions for course booking WJ-95480, issued on 6 April 2026. It is 1 page.", "special-requirements-note-WJ-95480.pdf. A special requirements note for course booking WJ-95480, issued on 3 February 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 822}} {"id": "isc-te-00210-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jundstead BV", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "20 April 2026"}, "checklist": ["Production downtime log - confirm it was issued within the last 3 months and is signed", "Purchase invoice for the machine", "Repair or replacement quotation - confirm it was issued within the last 3 months", "Equipment breakdown claim form - confirm it is signed"], "submission": {"case": {"name": "failed machine BH-86750", "reference": "XI-70320"}, "cover note": "Please find attached the claim pack for reference XI-70320. Everything needed is attached and complete. Kind regards, Ananya Thornwick", "documents received": ["Repair or replacement quotation for failed machine BH-86750. Date of issue: 5 March 2026. 2 pages, complete.", "Production downtime log for failed machine BH-86750. Date of issue: 6 February 2026. 2 pages, complete. Signed by the production supervisor.", "Purchase invoice for the machine, for failed machine BH-86750. Date of issue: 11 March 2026. Single page."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 464}} {"id": "isc-te-00264-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vaskwyn SAS", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "3 July 2026"}, "checklist": ["If the mobile app release adds a new payment feature, also include: payment provider compliance checklist (issued within the last 3 months, signed)", "Release notes (issued within the last 1 months)", "Crash-free rate report (issued within the last 1 months)", "Marketing screenshot pack", "Age rating questionnaire (signed)", "Device compatibility matrix (issued within the last 3 months)"], "submission": {"case": {"name": "mobile app release GK-82707", "reference": "VU-56351", "details": ["The mobile app release adds a new payment feature."]}, "cover note": "This pack has already been checked by a colleague, so it should be ready to go.", "documents received": ["crash_free_rate_report_GK-82707.pdf — Crash-free rate report for mobile app release GK-82707. Date of issue: 24 June 2026. Single page.", "age_rating_questionnaire_GK-82707.pdf — Age rating questionnaire for mobile app release GK-82707. Date of issue: 24 March 2026. 2 pages, complete. Signed by the product owner.", "release_notes_GK-82707.pdf — Release notes for mobile app release GK-82707. Date of issue: 1 July 2026. 2 pages, complete.", "device_compatibility_matrix_GK-82707.pdf — Device compatibility matrix for mobile app release GK-82707. Date of issue: 30 April 2026. 2 pages, complete.", "marketing_screenshots_GK-82707.pdf — Marketing screenshot pack for mobile app release GK-82707. Date of issue: 24 May 2026. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must judge if the pack is complete relative to the checklist. Review each line of the checklist that has relevance to this case. To count, a required document must match the kind of document the checklist specifies (a similar one will not do), must relate to the subject of the case, must include all its pages, must be signed wherever the checklist calls for a signature, must still be valid on the review date (that is, not expired), and must have been issued during the period the checklist permits. A conditional line binds the case only if the circumstance it describes actually holds. complete: all applicable lines are satisfied, and extra documents are of no consequence. incomplete: at least one applicable line fails. unclear: no line fails outright, but at least one cannot be decided on the basis of what is displayed, for example a necessary date, signature or page count is not visible, the kind of a document cannot be told, or the case details are silent on whether a conditional line's circumstance holds while that line's document is missing. Do not rely on cover notes or labels, which may mislead; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-52", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 865}} {"id": "isc-te-00434-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Quelbrook SAS", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "29 April 2026"}, "checklist": ["Experiment safety clearance form, signed, is included.", "Home institution endorsement letter, issued within the last 6 months and signed, is included.", "Radiation safety training certificate, issued within the last 24 months and signed, is included.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed, is included.", "Host scientist invitation letter, issued within the last 6 months and signed, is included.", "Photo identity document, valid (not expired) on the date of the review, is included."], "submission": {"case": {"name": "Rory Tibeau", "reference": "TW-86879", "details": ["The researcher will work outside standard opening hours."]}, "documents received": ["experiment_safety_clearance_form_Tibeau.pdf - Experiment safety clearance form for Rory Tibeau, dated 15 April 2026. 3 pages, complete. Signed by the facility safety officer.", "photo_identity_document_Tibeau.pdf - Photo identity document for Rory Tibeau, expiring 3 December 2026. 1 page.", "home_institution_endorsement_letter_Tibeau.pdf - Home institution endorsement letter for Rory Tibeau, dated 27 November 2025. 1 page. Signed by the home institution registrar.", "facility_access_application_form_Tibeau.pdf - Facility access application form for Rory Tibeau, dated 6 February 2026. 2 pages, complete. Signed by the applicant.", "radiation_safety_training_certificate_Tibeau.pdf - Radiation safety training certificate for Rory Tibeau, dated 14 June 2025. 1 page. Signed by the radiation protection officer.", "host_scientist_invitation_letter_Tibeau.pdf - Host scientist invitation letter for Rory Tibeau, dated 12 April 2026. 1 page. Signed by the host scientist."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00291-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Aldwick Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "14 July 2026"}, "checklist": ["Check for the thermostat calibration certificate, issued within the last 12 months.", "Check for the plant room access sign-in sheet.", "Check for the refrigerant top-up log, issued within the last 1 months and signed.", "Check for the asset condition photograph sheet, issued within the last 1 months.", "Check for the engineer's service report, issued within the last 1 months and signed.", "If the system contains more than 5 tonnes of refrigerant, also check for the fixed leak detection test certificate, issued within the last 6 months and signed."], "submission": {"case": {"name": "air conditioning system SL-89503", "reference": "NG-66391", "details": ["The system contains more than 5 tonnes of refrigerant."]}, "documents received": ["Asset condition photograph sheet SL-89503.pdf: An asset condition photograph sheet for air conditioning system SL-89503, dated 30 June 2026; 2 pages, complete.", "Plant room access sign-in sheet SL-89503.pdf: A single-page plant room access sign-in sheet for air conditioning system SL-89503, dated 25 June 2026.", "Thermostat calibration certificate SL-89503.pdf: A single-page thermostat calibration certificate for air conditioning system SL-89503, dated 4 November 2025.", "File 09.pdf: The contents of this file cannot be seen, as the scan is too faint to read.", "Fixed leak detection test certificate SL-89503.pdf: A fixed leak detection test certificate for air conditioning system SL-89503, dated 16 February 2026; 2 pages, complete, signed by the leak detection engineer.", "Engineer's service report SL-89503.pdf: An engineer's service report for air conditioning system SL-89503, dated 25 June 2026; 3 pages, complete, signed by the service engineer."]}}, "question": {"type": "choice", "instructions": "The task is to decide whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete if every applicable line is met (extra documents do not matter). Answer incomplete if at least one applicable line is not met. Answer unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-70", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 877}} {"id": "isc-te-00318-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Trelvale plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "29 April 2026"}, "checklist": ["Supplier self-assessment report, issued within the last 12 months, signed", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months, signed", "Raw material certificate of analysis, issued within the last 6 months, signed", "Certified quality management system certificate, valid (not expired) on the date of the review", "Supplier quality questionnaire, issued within the last 12 months, signed", "Supplier audit report, issued within the last 24 months, signed"], "submission": {"case": {"name": "Raskmoor Partners", "reference": "UB-25706", "details": ["The supplier subcontracts part of the production."]}, "cover note": "This pack was already checked by a colleague before it came to you.", "documents received": ["Scanned financial stability statement for Raskmoor Partners, dated 23 February 2026. 2 pages, complete. Signed by the supplier's finance director.", "Scanned subcontractor approval record for Raskmoor Partners, dated 26 April 2026. 2 pages, complete. Signed by the supplier's operations manager.", "Scanned supplier quality questionnaire for Raskmoor Partners, dated 15 July 2025. 4 pages, complete. Signed by the supplier's quality manager.", "Scanned raw material certificate of analysis for Raskmoor Partners, dated 23 February 2026. 2 pages, complete. The signature line is empty, so the document is not signed.", "Scanned supplier audit report for Raskmoor Partners, dated 9 May 2025. 8 pages, complete. Signed by the lead auditor.", "Scanned supplier self-assessment report for Raskmoor Partners, dated 24 October 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Scanned certified quality management system certificate for Raskmoor Partners, showing an expiry date of 23 January 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 867}} {"id": "isc-te-00398-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Prydhaven Ltd", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "3 July 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include the mediation request confirmation, issued within the last 1 months and signed", "Cure period expiry calculation, issued within the last 1 months and signed", "Losses calculation statement, issued within the last 1 months and signed", "Breach evidence log, issued within the last 1 months and signed", "Default notice previously served, issued within the last 6 months and signed", "Termination clause legal opinion, issued within the last 1 months and signed", "Original service agreement copy"], "submission": {"case": {"name": "Aldstow Group", "reference": "KZ-59584", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Mediation_request_confirmation_Aldstow_Group_29_June_2026.pdf — Mediation request confirmation concerning Aldstow Group, dated 29 June 2026. 1 page. Signed by the Head of Dispute Resolution.", "Litigation_hold_notice_Aldstow_Group_17_June_2026.pdf — Litigation hold notice concerning Aldstow Group, dated 17 June 2026. 2 pages, complete. Signed by the Head of Legal Services.", "Termination_clause_legal_opinion_Aldstow_Group_1_July_2026.pdf — Termination clause legal opinion concerning Aldstow Group, dated 1 July 2026. 5 pages, complete. Signed by the Legal Counsel.", "Breach_evidence_log_Aldstow_Group_13_June_2026.pdf — Breach evidence log concerning Aldstow Group, dated 13 June 2026. 6 pages, complete. The signature line is empty; the document is not signed.", "Original_service_agreement_copy_Aldstow_Group_23_April_2026.pdf — Original service agreement copy concerning Aldstow Group, dated 23 April 2026. 10 pages, complete.", "Losses_calculation_statement_Aldstow_Group_13_June_2026.pdf — Losses calculation statement concerning Aldstow Group, dated 13 June 2026. 3 pages, complete. Signed by the Finance Director.", "Cure_period_expiry_calculation_Aldstow_Group_18_June_2026.pdf — Cure period expiry calculation concerning Aldstow Group, dated 18 June 2026. 2 pages, complete. Signed by the Contracts Manager.", "Default_notice_previously_served_Aldstow_Group_16_June_2026.pdf — Default notice previously served on Aldstow Group, dated 16 June 2026. 1 page. Signed by the Contracts Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1034}} {"id": "isc-te-00430-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Quelston Ltd", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "13 March 2026"}, "checklist": ["If the researcher will work outside standard opening hours, also: out-of-hours access authorisation (signed)", "insurance declaration for facility work (issued within the last 12 months, signed)", "photo identity document (valid (not expired) on the date of the review)", "radiation safety training certificate (issued within the last 24 months, signed)", "home institution endorsement letter (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Faisal Ebbopoulos", "reference": "VC-78895", "details": ["The researcher will work only during standard opening hours."]}, "documents received": ["Photo identity document for Faisal Ebbopoulos, showing an expiry date of 11 July 2027. 1 page.", "Radiation safety training certificate, in the name of Faisal Ebbopoulos, dated 3 September 2024. 1 page, signed by the radiation safety officer.", "Home institution endorsement letter, in the name of Faisal Ebbopoulos, dated 27 December 2025. 1 page, signed by the head of department.", "Insurance declaration for facility work, in the name of Faisal Ebbopoulos, dated 1 July 2025. 1 page, signed by the visiting researcher.", "Experiment safety clearance form, in the name of Faisal Ebbopoulos, dated 1 February 2026. 3 pages, complete, signed by the host scientist."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 741}} {"id": "isc-te-00224-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Uldvale plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "9 June 2026"}, "checklist": ["If the customer requests a credit limit above the standard cap, also: finance director sanction letter (issued within the last 1 months, signed)", "Trade references letter (issued within the last 3 months, signed)", "Credit reference agency report (issued within the last 3 months)", "Personal guarantee (signed)", "Bank reference letter (issued within the last 6 months, signed)", "Signed credit terms agreement (signed)", "Company registration certificate"], "submission": {"case": {"name": "Holthorpe Limited", "reference": "ES-61445", "details": ["The customer requests a credit limit above the standard cap."]}, "documents received": ["Bank reference letter - Holthorpe Limited.pdf - Bank reference letter about Holthorpe Limited, dated 14 March 2026. It is 1 page. It is signed by the bank manager.", "Signed credit terms agreement - Holthorpe Limited.pdf - Signed credit terms agreement about Holthorpe Limited, dated 31 March 2026. It is 4 pages, complete. It is signed by a director of Holthorpe Limited.", "Credit limit approval memo - Holthorpe Limited.pdf - Credit limit approval memo about Holthorpe Limited, dated 27 May 2026. It is 1 page. It is signed by the credit control manager.", "Company registration certificate - Holthorpe Limited.pdf - Company registration certificate about Holthorpe Limited, dated 2 April 2026. It is 2 pages, complete.", "Trade references letter - Holthorpe Limited.pdf - Trade references letter about Holthorpe Limited, dated 3 April 2026. It is 1 page. It is signed by a director of the referee company.", "Credit reference agency report - Holthorpe Limited.pdf - Credit reference agency report about Holthorpe Limited, dated 26 May 2026. It is 6 pages, complete.", "Personal guarantee - Holthorpe Limited.pdf - Personal guarantee about Holthorpe Limited, dated 20 February 2026. It is 2 pages, complete. It is signed by the guarantor."]}}, "question": {"type": "choice", "instructions": "You are deciding whether the pack is complete when checked against the checklist. Go through every checklist line that applies to this case. Only if a required document is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows does it count. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves must be judged.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-58", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 903}} {"id": "isc-te-00116-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Dornfell Group", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "11 September 2026"}, "checklist": ["Meeting invitation with rights explained, issued within the last 1 months", "Investigator appointment letter, issued within the last 3 months", "Written grievance statement, signed", "Evidence bundle index, signed", "Adjustment request record, issued within the last 3 months, signed", "Previous grievance outcome letter, issued within the last 24 months", "Only if this applies: if the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed"], "submission": {"case": {"name": "Antoine Ingstow", "reference": "SD-74482", "details": ["The grievance makes no allegation of bullying."]}, "documents received": ["Meeting invitation with rights explained. The invitation concerns Antoine Ingstow. It shows its date of issue as 3 September 2026. It is a single page.", "Grievance procedure acknowledgement. The acknowledgement concerns Antoine Ingstow. It shows its date of issue as 16 July 2026. It is single page. It is signed by the employee relations adviser.", "Previous grievance outcome letter. The letter concerns Antoine Ingstow. It shows its date of issue as 14 March 2026. 2 pages, complete.", "Witness list. The list concerns Antoine Ingstow. It shows its date of issue as 22 May 2026. It is a single page. It is signed by the case handler.", "Random pile of undated emails. It concerns Antoine Ingstow. It shows its date of issue as 3 June 2026. 2 pages, complete. It is signed by the case handler.", "Adjustment request record. The record concerns Antoine Ingstow. It shows its date of issue as 12 August 2024. It is a single page. It is signed by the employee relations adviser.", "Investigator appointment letter. The letter concerns Antoine Ingstow. It shows its date of issue as 31 July 2026. It is a single page.", "Written grievance statement. The statement concerns Antoine Ingstow. It shows its date of issue as 4 July 2026. It is signed by Antoine Ingstow. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 904}} {"id": "isc-te-00145-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Jorgard Ltd", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "13 May 2026"}, "checklist": ["If the property is a listed building, also: listed building consent (issued within the last 12 months, signed)", "energy performance certificate (valid (not expired) on the date of the review)", "If the household rents the home, also: landlord written permission (issued within the last 6 months, signed)", "scaffolding agreement (signed)", "planning permission letter (issued within the last 12 months)", "roof structural report (issued within the last 6 months, signed)"], "submission": {"case": {"name": "roof NL-16490", "reference": "UA-46931", "details": ["The property is not a listed building.", "The household owns the home."]}, "documents received": ["Roof structural report - roof NL-16490.pdf. The report is about roof NL-16490 and shows a date of issue of 18 February 2026. 4 pages, complete. It is signed by the structural engineer.", "Scaffolding agreement - roof NL-16490.pdf. The agreement is about roof NL-16490 and shows a date of issue of 17 April 2026. 2 pages, complete. It is signed by the scaffolding contractor.", "Planning permission letter - roof NL-16490.pdf. The letter is about roof NL-16490 and shows a date of issue of 5 December 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist. Go through every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Choose complete if every applicable line is met (extra documents do not matter). Choose incomplete if at least one applicable line is not met. Choose unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 2, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "variant-30", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 764}} {"id": "isc-te-00196-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Ivrhaven Limited", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "3 August 2026"}, "checklist": ["Customer order history extract, issued within the last 6 months", "If the customer claims the item was not as described, also: product description screenshot archive, issued within the last 6 months", "Signature proof of delivery, issued within the last 6 months, signed", "Transaction record printout, issued within the last 3 months", "Customer account details page, issued within the last 3 months", "Terms of sale acceptance log, issued within the last 12 months"], "submission": {"case": {"name": "disputed transaction DD-99864", "reference": "FL-51485", "details": ["The customer claims the item was not as described."]}, "documents received": ["Customer order history extract for disputed transaction DD-99864. Date of issue: 5 July 2026. 2 pages, complete.", "Customer account details page for disputed transaction DD-99864. Date of issue: 18 June 2026. Single page.", "Signature proof of delivery for disputed transaction DD-99864. Date of issue: 19 March 2026. Single page. Signed by the delivery driver.", "Transaction record printout for disputed transaction DD-99864. Date of issue: 12 June 2026. Single page.", "Terms of sale acceptance log for disputed transaction DD-99864. Date of issue: 5 June 2026. Single page.", "Social media profile page for disputed transaction DD-99864. Date of issue: 18 June 2026. Single page.", "Product description screenshot archive for disputed transaction DD-99864. Date of issue: 31 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00089-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Fravwyn Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "16 July 2026"}, "checklist": ["Special requests note, signed", "Booking request form, signed", "Flight availability printout, issued within the last 1 months", "Passport details form, signed", "Travel insurance quote, issued within the last 1 months", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review", "Customer deposit receipt, issued within the last 3 months"], "submission": {"case": {"name": "holiday booking DO-39970", "reference": "NL-53165", "details": ["The booking includes a child traveller."]}, "cover note": "Please could you approve this pack as soon as possible, as all the paperwork is in order. Many thanks, Ethan Vintery", "documents received": ["Travel insurance quote DO-39970. Issued 8 July 2026. 2 pages, complete.", "Booking request form DO-39970. Issued 23 April 2026. 2 pages, complete, signed by the customer.", "Customer deposit receipt DO-39970. Issued 19 May 2026. 1 page.", "Flight availability printout DO-39970. Issued 8 July 2026. 2 pages, complete.", "Special requests note DO-39970. Issued 17 June 2026. 1 page, signed by the customer.", "Passport details form DO-39970. Issued 15 June 2026. 1 page, signed by the customer.", "Package holiday brochure page DO-39970. Issued 29 March 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00386-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Orrston BV", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "18 May 2026"}, "checklist": ["Signed trial period proposal", "Line manager opinion note, signed and issued within the last 2 months", "Current working pattern statement issued within the last 3 months", "Previous flexible working requests record issued within the last 24 months", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed", "If the request is to work entirely from home, also: home working equipment checklist, signed"], "submission": {"case": {"name": "Daan Kerrridge", "reference": "XS-33835", "details": ["The employee has caring responsibilities for a dependent.", "The request is not to work entirely from home."]}, "documents received": ["Caring responsibilities statement - Daan Kerrridge.pdf - Caring responsibilities statement concerning Daan Kerrridge, dated 8 May 2026. It is 1 page and is signed by Daan Kerrridge.", "Trial period proposal - Daan Kerrridge.pdf - Trial period proposal concerning Daan Kerrridge, dated 27 March 2026. It is 1 page and is signed by the line manager.", "Record of another employee's request - Daan Kerrridge.pdf - Record of a request concerning Daan Kerrridge made by another employee, dated 28 April 2026. It is 1 page.", "Current working pattern statement - Daan Kerrridge.pdf - Current working pattern statement concerning Daan Kerrridge, dated 10 April 2026. It is 1 page.", "Line manager opinion note - Daan Kerrridge.pdf - Line manager opinion note concerning Daan Kerrridge, dated 10 May 2026. It is 2 pages, complete, and is signed by the line manager.", "Proposed working pattern plan - Daan Kerrridge.pdf - Proposed working pattern plan concerning Daan Kerrridge, dated 9 May 2026. It is 2 pages, complete, and is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Review every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-71", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 836}} {"id": "isc-te-00193-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Wilmfield SAS", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "30 March 2026"}, "checklist": ["Photo identification, valid (not expired) on the date of the review", "Lost card declaration, signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "Fraud questionnaire, signed", "Card replacement request form, signed", "Confirmation of contact details, issued within the last 3 months"], "submission": {"case": {"name": "Omar Tadock", "reference": "OH-47944", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["account_statement_tadock_oh47944.pdf - Account statement showing recent activity for Omar Tadock. It shows a date of issue of 16 March 2026. 3 pages, complete.", "photo_id_tadock_oh47944.pdf - Photo identification for Omar Tadock. It shows an expiry date of 4 May 2027. 1 page.", "overseas_address_form_tadock_oh47944.pdf - Temporary overseas address registration form for Omar Tadock. It shows a date of issue of 22 February 2026. 1 page, signed by Omar Tadock.", "fraud_questionnaire_tadock_oh47944.pdf - Fraud questionnaire for Omar Tadock. It shows a date of issue of 10 January 2026. 2 pages, complete. It is signed by Omar Tadock.", "lost_card_declaration_tadock_copy_oh47944.pdf - Lost card declaration for Omar Tadock. It shows a date of issue of 19 January 2026. 1 page; the signature block is covered by a sticky note, so it is not known whether it is signed.", "card_replacement_request_tadock_oh47944.pdf - Card replacement request form for Omar Tadock. It shows a date of issue of 19 February 2026. 2 pages, complete. It is signed by Omar Tadock.", "contact_details_confirmation_tadock_oh47944.pdf - Confirmation of contact details for Omar Tadock. It shows a date of issue of 11 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 909}} {"id": "isc-te-00377-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Vornburg & Co", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "24 April 2026"}, "checklist": ["If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "venue access instructions (issued within the last 3 months)", "If the delegate requires an adjusted learning plan, also: learning support agreement (signed)", "payment confirmation (issued within the last 3 months)", "delegate photo identification (valid (not expired) on the date of the review)", "special requirements note", "cancellation policy acceptance (signed)"], "submission": {"case": {"name": "course booking UL-99308", "reference": "DD-21847", "details": ["The course leads to a licensed qualification.", "The delegate requires no adjusted learning plan."]}, "documents received": ["Payment confirmation for course booking UL-99308, issued on 20 April 2026. Single page.", "Cancellation policy acceptance for course booking UL-99308, issued on 25 February 2026. Single page. Signed by the delegate.", "Special requirements note for course booking UL-99308, issued on 21 January 2026. Single page.", "Licence eligibility declaration for course booking UL-99308, issued on 4 April 2026. Single page. Signed by the delegate.", "Venue access instructions for course booking UL-99308, issued on 11 February 2026. Single page.", "Delegate photo identification for course booking UL-99308. It shows an expiry date of 19 December 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Your task is to decide whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-40", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 768}} {"id": "isc-te-00304-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Stervgard Ltd", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "20 March 2026"}, "checklist": ["Check that the engineer's fault diagnosis report is included, that it was issued within the last 3 months, and that it is signed.", "If the breakdown spoiled perishable stock, also check that the spoiled stock disposal certificate is included, that it was issued within the last 3 months, and that it is signed.", "Check that the policy machinery schedule is included.", "Check that the production downtime log is included, that it was issued within the last 3 months, and that it is signed.", "Check that photographs of the failed component are included.", "Check that the purchase invoice for the machine is included."], "submission": {"case": {"name": "failed machine VU-78923", "reference": "UW-19124", "details": ["The breakdown spoiled perishable stock."]}, "documents received": ["machine_maintenance_log_VU-78923.pdf. This machine maintenance log covers failed machine VU-78923 and is dated 12 December 2025. It has 5 pages, complete.", "purchase_invoice_machine_VU-78923.pdf. This purchase invoice for the machine relates to failed machine VU-78923 and is dated 26 January 2026. It is a single page.", "production_downtime_log_VU-78923.pdf. This production downtime log covers failed machine VU-78923 and is dated 18 February 2026. It has 2 pages, complete, and is signed by the production supervisor.", "photographs_failed_component_VU-78923.pdf. This set of photographs of the failed component relates to failed machine VU-78923 and is dated 14 March 2026. It has 2 pages, complete.", "engineer_fault_diagnosis_report_VU-78923.pdf. This engineer's fault diagnosis report covers failed machine VU-78923 and is dated 14 January 2026. It has 4 pages, complete, and is signed by the attending engineer.", "policy_machinery_schedule_VU-78923.pdf. This policy machinery schedule covers failed machine VU-78923 and is dated 26 November 2025. It has 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 926}} {"id": "isc-te-00326-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Marlthorpe LLP", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "5 August 2026"}, "checklist": ["P60 tax summary, issued within the last 15 months", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months and signed", "Passport, valid (not expired) on the date of the review", "Mortgage application form, issued within the last 3 months and signed", "Property valuation report, issued within the last 3 months and signed"], "submission": {"case": {"name": "Henry Bramell", "reference": "PP-95128", "details": ["The borrower is not self-employed."]}, "cover note": "I have put the pack together as best I can, but I am not sure that everything needed is in there, so please check and let me know if anything else is required.", "documents received": ["Loan_Affordability_Calculator_Printout_Bramell_PP-95128.pdf — Loan affordability calculator printout for Henry Bramell. Date of issue: 25 May 2026. 10 pages, complete. Signed by the mortgage adviser.", "Property_Valuation_Report_Bramell_PP-95128.pdf — Property valuation report for Henry Bramell. Date of issue: 19 July 2026. 8 pages, complete. Signed by the valuer.", "Mortgage_Application_Form_Bramell_PP-95128.pdf — Mortgage application form for Henry Bramell. Date of issue: 25 May 2026. 10 pages, complete. Signed by the borrower.", "P60_Bramell_PP-95128.pdf — P60 tax summary for Henry Bramell. Date of issue: 9 December 2025. 2 pages, complete.", "Passport_Bramell_PP-95128.pdf — Passport for Henry Bramell. Expiry date: 23 September 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00025-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Dravside Group", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "16 September 2026"}, "checklist": ["Previous grievance outcome letter, issued within the last 24 months.", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed.", "Witness list, signed.", "Evidence bundle index, signed.", "Investigator appointment letter, issued within the last 3 months."], "submission": {"case": {"name": "Carmen Daskow", "reference": "VR-41263", "details": ["The grievance is not against the employee's direct manager."]}, "documents received": ["VR-41263 previous grievance outcome letter - Carmen Daskow.pdf. Previous grievance outcome letter about Carmen Daskow, dated 16 January 2025. 2 pages, complete.", "VR-41263 investigator appointment letter - Carmen Daskow.pdf. Investigator appointment letter about Carmen Daskow, dated 12 July 2026. A single page.", "VR-41263 witness list - Carmen Daskow.pdf. Witness list about Carmen Daskow, dated 3 July 2026. A single page, signed by the case handler."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 671}} {"id": "isc-te-00267-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Yselcombe LLP", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "6 July 2026"}, "checklist": ["Insurance excess waiver certificate, valid (not expired) on the date of the review.", "Passport, valid (not expired) on the date of the review, and signed.", "Fuel policy sheet, signed.", "Additional driver authorisation form, signed.", "Vehicle condition report, signed.", "Booking voucher, issued within the last 6 months.", "If the booking includes crossing a land border, also: cross-border travel permission, signed."], "submission": {"case": {"name": "Thomas Yellworth", "reference": "KU-46488", "details": ["The booking stays within one country."]}, "documents received": ["Vehicle condition report for Thomas Yellworth. It shows a date of issue of 18 May 2026 and is signed by the counter agent. It is 2 pages, complete.", "Additional driver authorisation form for Thomas Yellworth. It shows a date of issue of 26 June 2026 and is signed by the hirer, Thomas Yellworth. It is 1 page.", "Passport for Thomas Yellworth. The date field is covered by an ink stamp, so the date cannot be seen, and it is signed by the bearer, Thomas Yellworth. It is 1 page.", "Fuel policy sheet for Thomas Yellworth. It shows a date of issue of 24 May 2026 and is signed by the hirer, Thomas Yellworth. It is 1 page.", "Insurance excess waiver certificate for Thomas Yellworth. It shows an expiry date of 4 May 2027. 2 pages, complete.", "Booking voucher for Thomas Yellworth. It shows a date of issue of 7 June 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 795}} {"id": "isc-te-00167-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Orrwell Limited", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "14 April 2026"}, "checklist": ["Identity verification document (valid, not expired, on the date of the review)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Marketing consent form (signed)", "Customer contact details sheet (signed)", "Initial points balance statement (issued within the last 3 months)", "Loyalty scheme enrolment form (signed)"], "submission": {"case": {"name": "Brooke Ullstad", "reference": "VX-71748", "details": ["The customer is joining as a single-person account."]}, "cover note": "Please find attached everything needed for this sign-up, all complete. The pack is ready for your review.", "documents received": ["Initial points balance statement VX-71748_d4.pdf. A one-page initial points balance statement for Brooke Ullstad, dated 10 March 2026.", "Identity verification document VX-71748_d1.pdf. A one-page identity verification document for Brooke Ullstad. The date on the document is not visible, as it is covered by an ink stamp.", "Customer contact details sheet VX-71748_d3.pdf. A one-page customer contact details sheet for Brooke Ullstad, dated 29 March 2026. The sheet is signed by the customer.", "Marketing consent form VX-71748_d2.pdf. A one-page marketing consent form for Brooke Ullstad, dated 20 February 2026. The form is signed by the customer.", "Loyalty scheme enrolment form VX-71748_d5.pdf. A one-page loyalty scheme enrolment form for Brooke Ullstad, dated 8 January 2026. The form is signed by the customer."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack fulfils the checklist. Work through every checklist line relevant to this case. For a required document to count, it must be the kind of document the checklist lists (a similar one will not do), be about the subject of the case, have all its pages, be signed in every place the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, but at least one cannot be settled from what is shown, for instance when a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may prove misleading; evaluate the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-38", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 818}} {"id": "isc-te-00215-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Briskmore SAS", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "2 June 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include: mediation request confirmation (issued within the last 1 months, signed)", "Include: breach evidence log (issued within the last 1 months, signed)", "Include: default notice previously served (issued within the last 6 months, signed)", "Include: termination clause legal opinion (issued within the last 1 months, signed)", "Include: losses calculation statement (issued within the last 1 months, signed)", "Include: original service agreement copy", "Include: litigation hold notice (issued within the last 1 months, signed)"], "submission": {"case": {"name": "Boltley Group", "reference": "EQ-15194", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Default notice previously served, Boltley Group, dated 31 January 2026. One page. Signed by the contract manager.", "Original service agreement copy, Boltley Group, dated 22 April 2026. 10 pages, complete.", "Mediation request confirmation, Boltley Group, dated 23 May 2026. One page. Signed by the mediation provider's case administrator.", "Litigation hold notice, Boltley Group, dated 20 May 2026. 2 pages, complete. Signed by the legal counsel.", "Breach evidence log, Boltley Group, dated 19 May 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Losses calculation statement, Boltley Group, dated 29 May 2026. 3 pages, complete. Signed by the finance manager."]}}, "question": {"type": "choice", "instructions": "Does the pack satisfy the checklist? Work through each checklist line relevant to this case. A required document counts only if it matches the kind of document listed (not a similar one), concerns the subject of the case, contains all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-32", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 777}} {"id": "isc-te-00445-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vaskburg Partners", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "27 August 2026"}, "checklist": ["If the claim exceeds the limit that requires director sign-off, also: director approval slip (issued within the last 3 months, signed)", "taxi fare receipt (issued within the last 6 months)", "restaurant receipt (issued within the last 6 months)", "train ticket receipt", "conference fee invoice (issued within the last 12 months)", "hotel invoice (issued within the last 6 months)"], "submission": {"case": {"name": "Claire Daskard", "reference": "YL-14076", "details": ["The claim exceeds the limit that requires director sign-off."]}, "cover note": "Apologies, as this pack was put together in a rush. Thank you for your patience while you review it.", "documents received": ["Restaurant receipt. It concerns Claire Daskard and shows its date of issue as 19 July 2026. It is 1 page.", "Expense claim form. It concerns Claire Daskard and shows its date of issue as 30 April 2026. It is 2 pages, complete, and carries the signature of the claiming employee.", "Train ticket receipt. It concerns Claire Daskard and shows its date of issue as 7 July 2026. It is 1 page.", "Director approval slip. It concerns Claire Daskard and shows its date of issue as 1 July 2026. It is 1 page and carries the signature of the finance director.", "Boarding pass stub. It concerns Claire Daskard and shows its date of issue as 11 August 2026. It is 1 page.", "Hotel invoice. It concerns Claire Daskard and shows its date of issue as 31 March 2026. It is 2 pages, complete.", "Conference fee invoice. It concerns Claire Daskard and shows its date of issue as 4 March 2026. It is 1 page.", "Taxi fare receipt. It concerns Claire Daskard and shows its date of issue as 25 July 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 866}} {"id": "isc-te-00412-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Cranhall GmbH", "reviewer": "the marketing operations team", "pack": "marketing internship placement file", "purpose": "before an intern starts work in the marketing department", "date of the review": "1 September 2026"}, "checklist": ["Check that the placement learning plan is included and signed.", "If the intern is under 18 years old, also check that the parent or guardian consent form is included and signed.", "Check that the mentor assignment note is included and signed.", "Check that the internship agreement is included and signed.", "Check that the right to work check record is included, signed, and was issued within the last 6 months."], "submission": {"case": {"name": "Thomas Wraxell", "reference": "BC-74476", "details": ["The intern is under 18 years old."]}, "documents received": ["parent_guardian_consent_wraxell.pdf - Parent or guardian consent form for Thomas Wraxell, issued 18 May 2026. 1 page. Signed by the parent or guardian.", "mentor_assignment_note_wraxell.pdf - Mentor assignment note for Thomas Wraxell, issued 25 May 2026. 1 page. Signed by the marketing operations team lead.", "internship_agreement_wraxell.pdf - Internship agreement for Thomas Wraxell, issued 18 May 2026. 4 pages, complete. Signed by the marketing department head and the intern.", "right_to_work_check_wraxell_2026-02-18.pdf - Right to work check record for Thomas Wraxell, issued 18 February 2026. 1 page. Signed by the HR records officer.", "placement_learning_plan_wraxell.pdf - Placement learning plan for Thomas Wraxell, issued 18 May 2026. 2 pages, complete. Signed by the marketing department supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "marketing internship placement file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 775}} {"id": "isc-te-00049-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Kenvston Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "24 April 2026"}, "checklist": ["If the audit found a major non-conformity, also: major non-conformity corrective action plan (signed)", "audit interview notes (signed)", "internal audit plan (issued within the last 12 months, signed)", "audit attendance sheet (signed)", "audit checklist for each area visited (signed)"], "submission": {"case": {"name": "internal audit CD-75948", "reference": "DM-54948", "details": ["The audit found a major non-conformity."]}, "documents received": ["internal_audit_plan_CD-75948.pdf - Internal audit plan for internal audit CD-75948. Date of issue: 23 December 2025. 2 pages, complete. Signed by the lead auditor.", "audit_finding_sheets_CD-75948.pdf - Audit finding sheets for internal audit CD-75948. Date of issue: 30 March 2026. 2 pages, complete. Signed by the lead auditor.", "audit_checklist_CD-75948.pdf - Audit checklist for each area visited under internal audit CD-75948. Date of issue: 17 January 2026. 4 pages, complete. Signed by the lead auditor.", "audit_attendance_sheet_CD-75948.pdf - Audit attendance sheet for internal audit CD-75948. Date of issue: 23 February 2026. 1 page. Signed by the lead auditor.", "audit_interview_notes_CD-75948.pdf - Audit interview notes for internal audit CD-75948. Date of issue: 2 February 2026. 3 pages, complete. Signed by the lead auditor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 807}} {"id": "isc-te-00196-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Ivrhaven Limited", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "3 August 2026"}, "checklist": ["Customer order history extract, issued within the last 6 months", "If the customer claims the item was not as described, also: product description screenshot archive, issued within the last 6 months", "Signature proof of delivery, issued within the last 6 months, signed", "Transaction record printout, issued within the last 3 months", "Customer account details page, issued within the last 3 months", "Terms of sale acceptance log, issued within the last 12 months"], "submission": {"case": {"name": "disputed transaction DD-99864", "reference": "FL-51485", "details": ["The customer claims the item was not as described."]}, "documents received": ["Customer order history extract for disputed transaction DD-99864. Date of issue: 5 July 2026. 2 pages, complete.", "Transaction record printout for disputed transaction DD-99864. Date of issue: 12 June 2026. Single page.", "Delivery confirmation for disputed transaction DD-99864. Date of issue: 30 May 2026. Single page.", "Social media profile page for disputed transaction DD-99864. Date of issue: 18 June 2026. Single page.", "Signature proof of delivery for disputed transaction DD-99864. Date of issue: 19 March 2026. Single page. Signed by the delivery driver.", "Fraud screening result sheet for disputed transaction DD-99864. Date of issue: 24 June 2026. Single page.", "Product description screenshot archive for disputed transaction DD-99864. Date of issue: 31 July 2026. 2 pages, complete.", "Terms of sale acceptance log for disputed transaction DD-99864. Date of issue: 5 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00273-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Pravburg Group", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "11 May 2026"}, "checklist": ["Confirm the pack includes the final payroll cut-off note, issued within the last 1 months and signed.", "If the leaver is moving to a competitor, also: confidential data removal attestation, issued within the last 1 months and signed.", "Confirm the pack includes the shared mailbox handover record, issued within the last 1 months and signed.", "Confirm the pack includes the leaver notification form, signed.", "Confirm the pack includes the non-disclosure reminder acknowledgement, signed.", "Confirm the pack includes the line manager confirmation, issued within the last 1 months and signed.", "Confirm the pack includes the access rights inventory, issued within the last 1 months."], "submission": {"case": {"name": "Elena Ingmore", "reference": "CR-23529", "details": ["The leaver is not moving to a competitor."]}, "documents received": ["non-disclosure reminder acknowledgement – Elena Ingmore.pdf. A non-disclosure reminder acknowledgement concerning Elena Ingmore, dated 26 March 2026. It is a single page and is signed by Elena Ingmore.", "equipment return receipt – Elena Ingmore.pdf. An equipment return receipt concerning Elena Ingmore, dated 30 April 2026. It is a single page and is signed by the asset coordinator.", "final payroll cut-off note – Elena Ingmore.pdf. A final payroll cut-off note concerning Elena Ingmore, dated 23 April 2026. It is a single page and is signed by the payroll manager.", "leaver notification form – Elena Ingmore.pdf. A leaver notification form concerning Elena Ingmore, dated 30 March 2026. It runs to 2 pages, complete, and is signed by HR.", "access rights inventory – Elena Ingmore.pdf. An access rights inventory concerning Elena Ingmore, dated 5 May 2026. It runs to 4 pages, complete.", "shared mailbox handover record – Elena Ingmore.pdf. A shared mailbox handover record concerning Elena Ingmore, dated 4 May 2026. It runs to 2 pages, complete, and is signed by the IT operations lead.", "line manager confirmation – Elena Ingmore.pdf. A line manager confirmation concerning Elena Ingmore, dated 23 April 2026. It is a single page and is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "partial", "defect": "signed", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-65", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 926}} {"id": "isc-te-00076-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Boltshaw LLP", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "13 July 2026"}, "checklist": ["Check the payment gateway technical specification is present in the pack.", "Check the data protection impact assessment is present in the pack, that it was issued within the last 12 months, and that it is signed.", "Check the fraud screening configuration sheet is present in the pack and that it is signed.", "Check the go-live sign-off certificate is present in the pack, that it was issued within the last 1 months, and that it is signed.", "If the gateway will handle recurring subscription payments, also check the subscription billing mandate template is present in the pack and that it is signed.", "Check the test environment transaction log is present in the pack and that it was issued within the last 1 months."], "submission": {"case": {"name": "payment gateway UG-10911", "reference": "RD-95415", "details": ["The gateway will not handle recurring subscription payments."]}, "cover note": "I am not sure everything needed is in this pack, so please take a look and let me know if anything else is required before go-live. Thanks, Eoin Zellani", "documents received": ["Live sales report from the online store for payment gateway UG-10911, dated 3 July 2026. 4 pages, complete.", "Data protection impact assessment for payment gateway UG-10911, dated 22 January 2026. It is signed by the Data Protection Officer. 5 pages, complete.", "Test environment transaction log for payment gateway UG-10911, dated 3 July 2026. 4 pages, complete.", "Fraud screening configuration sheet for payment gateway UG-10911, dated 26 May 2026. It is signed by the Fraud Screening Lead. 1 page.", "Payment gateway technical specification for payment gateway UG-10911, dated 10 May 2026. 8 pages, complete.", "Go-live sign-off certificate for payment gateway UG-10911, dated 1 July 2026. It is signed by the Payments Team Lead. 1 page.", "File 7743.pdf: the scan is blank, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 909}} {"id": "isc-te-00085-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Marlham GmbH", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "19 May 2026"}, "checklist": ["Driving licence: valid (not expired) on the date of the review, signed", "Additional driver authorisation form: signed", "Passport: valid (not expired) on the date of the review, signed", "Credit card in the driver's name: valid (not expired) on the date of the review, signed", "Vehicle condition report: signed"], "submission": {"case": {"name": "Eoin Thornden", "reference": "KU-86966"}, "documents received": ["vehicle_condition_report_thornden.pdf. Vehicle condition report for Eoin Thornden, issued 6 May 2026. 2 pages, complete. Signed by the inspecting branch staff member.", "insurance_excess_waiver_certificate_thornden.pdf. Insurance excess waiver certificate for Eoin Thornden, expiring 11 November 2027. 2 pages, complete.", "credit_card_thornden.pdf. Credit card in the driver's name for Eoin Thornden, expiring 18 November 2026. Single page. Signed by the cardholder.", "driving_licence_thornden.pdf. Driving licence for Eoin Thornden, expiring 8 August 2027. 2 pages, complete. Signed by the licence holder.", "booking_voucher_thornden.pdf. Booking voucher for Eoin Thornden, issued 10 February 2026. Single page.", "passport_thornden.pdf. Passport for Eoin Thornden, expiring 24 August 2028. Single page. Signed by the issuing authority.", "additional_driver_authorisation_form_thornden.pdf. Additional driver authorisation form for Eoin Thornden, issued 18 April 2026. Single page. Signed by the named driver."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00465-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Zalddale Group", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "13 July 2026"}, "checklist": ["Prerequisite certificate included", "If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "Employer sponsorship letter included (issued within the last 3 months, signed)", "Course booking form included (signed)", "Payment confirmation included (issued within the last 3 months)", "If the delegate requires an adjusted learning plan, also: learning support agreement (signed)"], "submission": {"case": {"name": "course booking BS-25601", "reference": "KW-27021", "details": ["The course leads to a licensed qualification.", "The delegate requires an adjusted learning plan."]}, "documents received": ["employer_sponsorship_letter_BS-25601.pdf. A single-page employer sponsorship letter for course booking BS-25601, issued on 25 April 2026, signed by the employer's authorised signatory.", "learning_support_agreement_BS-25601.pdf. A single-page learning support agreement for course booking BS-25601, issued on 19 March 2026, signed by the course tutor.", "course_booking_form_BS-25601.pdf. A course booking form for course booking BS-25601, issued on 3 April 2026. 2 pages, complete, signed by the delegate.", "venue_access_instructions_BS-25601.pdf. A single-page set of venue access instructions for course booking BS-25601, issued on 3 June 2026.", "payment_confirmation_BS-25601.pdf. A single-page payment confirmation for course booking BS-25601, issued on 3 May 2026.", "licence_eligibility_declaration_BS-25601.pdf. A single-page licence eligibility declaration for course booking BS-25601, issued on 21 June 2026, signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 840}} {"id": "isc-te-00345-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Quorwald Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 March 2026"}, "checklist": ["Marketing consent form, signed, on file.", "Identity verification document, valid (not expired) on the date of the review, on file.", "Loyalty scheme enrolment form, signed, on file.", "If the customer is joining as a household account with a shared card, also: household member details form, signed, on file.", "Customer contact details sheet, signed, on file.", "Points transfer request, signed, on file.", "Terms and conditions acceptance sheet, signed, on file.", "If the customer is transferring points from a rival scheme, also: points transfer evidence statement, issued within the last 3 months and signed, on file."], "submission": {"case": {"name": "Siobhan Zellson", "reference": "RV-67522", "details": ["The customer is joining as a single-person account.", "The customer is transferring points from a rival scheme."]}, "documents received": ["Terms and conditions acceptance sheet for Siobhan Zellson. It shows a date of issue of 4 January 2026 and is signed by Siobhan Zellson. It is a single page.", "Points transfer request for Siobhan Zellson. It shows a date of issue of 19 February 2026 and is signed by Siobhan Zellson. It is a single page.", "Nominated store preference form for Siobhan Zellson. It shows a date of issue of 6 December 2025 and is signed by Siobhan Zellson. It is a single page.", "Points transfer evidence statement for Siobhan Zellson. It shows a date of issue of 4 March 2026 and is signed by Siobhan Zellson. It is a single page.", "Loyalty scheme enrolment form for Siobhan Zellson. It shows a date of issue of 11 January 2026 and is signed by Siobhan Zellson. It is a single page.", "Identity verification document for Siobhan Zellson. It shows an expiry date of 17 April 2027. It is a single page.", "Customer contact details sheet for Siobhan Zellson. It shows a date of issue of 29 December 2025 and is signed by Siobhan Zellson. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 915}} {"id": "isc-te-00104-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Fervford plc", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "25 March 2026"}, "checklist": ["Lost card declaration, signed", "Account statement showing recent activity, issued within the last 1 months", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "Signature verification record, signed", "Delivery address confirmation, signed", "Fraud questionnaire, signed", "Photo identification, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Logan Pimberg", "reference": "ZD-97935"}, "cover note": "Please find the pack for reference ZD-97935 attached. Everything needed is attached and complete.", "documents received": ["Delivery address confirmation - Pimberg ZD-97935.pdf - Delivery address confirmation concerning Logan Pimberg, dated 21 December 2025. Single page. Signed by the cardholder.", "Card replacement request form - Pimberg ZD-97935.pdf - Card replacement request form concerning Logan Pimberg, dated 17 December 2025. 2 pages, complete. Signed by the cardholder.", "Photo identification - Pimberg ZD-97935.pdf - Photo identification concerning Logan Pimberg, showing an expiry date of 10 December 2027. Single page.", "Fraud questionnaire - Pimberg ZD-97935.pdf - Fraud questionnaire concerning Logan Pimberg, dated 12 February 2026. 2 pages, complete. Signed by the cardholder.", "Lost card declaration - Pimberg ZD-97935.pdf - Lost card declaration concerning Logan Pimberg, dated 15 January 2026. Single page. Signed by the cardholder.", "Account statement - Pimberg ZD-97935.pdf - Account statement showing recent activity concerning Logan Pimberg, dated 15 March 2026. 3 pages, complete.", "Signature verification record - Pimberg ZD-97935.pdf - Signature verification record concerning Logan Pimberg, dated 19 February 2026. Single page. Signed by a card services officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00159-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Dornwell Limited", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "3 June 2026"}, "checklist": ["Benefit claim form, valid (not expired) on the date of the review and signed", "Recent bank statements, issued within the last 2 months", "Proof of savings, issued within the last 2 months", "If the claimant is living in temporary accommodation arranged by the council, also: temporary accommodation placement letter", "Proof of identity, valid (not expired) on the date of the review", "Rent book or rent payment schedule, issued within the last 2 months"], "submission": {"case": {"name": "Seren Wadow", "reference": "SW-66484"}, "documents received": ["Rent book or rent payment schedule for Seren Wadow. Date of issue: 13 April 2026. 4 pages, complete.", "Recent bank statements for Seren Wadow. Date of issue: 25 May 2026. 12 pages, complete.", "Benefit claim form for Seren Wadow. Expiry date shown: 1 January 2027. 12 pages, complete. Signed by the claimant.", "Proof of identity for Seren Wadow. Expiry date shown: 29 August 2027. Single page.", "Current tenancy agreement for Seren Wadow. Date of issue: 6 March 2026. 12 pages, complete. Signed by the landlord.", "Temporary accommodation placement letter for Seren Wadow. Date of issue: 24 March 2026. 2 pages, complete.", "Proof of savings for Seren Wadow. Date of issue: 26 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 777}} {"id": "isc-te-00451-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Kerrmore & Co", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "20 March 2026"}, "checklist": ["Asset register update, issued within the last 1 months.", "Licence reassignment note, issued within the last 3 months, signed.", "Decommission request form, signed.", "Data migration confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server HL-31798", "reference": "GT-43265"}, "documents received": ["data-migration-confirmation-HL-31798.pdf. Data migration confirmation about retired server HL-31798. Date of issue: 7 March 2026. 2 pages, complete. Signed by the data migration lead.", "licence-reassignment-note-HL-31798.pdf. Licence reassignment note about retired server HL-31798. Date of issue: 3 March 2026. 1 page. Signed by the operations manager.", "decommission-request-form-HL-31798.pdf. Decommission request form about retired server HL-31798. Date of issue: 29 November 2025. 2 pages, complete. Signed by the requesting team lead.", "licence-invoice-HL-31798.pdf. Licence invoice about retired server HL-31798. Date of issue: 3 March 2026. 1 page. Signed by the vendor sales representative.", "asset-register-update-HL-31798.pdf. Asset register update about retired server HL-31798. Date of issue: 5 March 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 774}} {"id": "isc-te-00081-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Varnheim LLP", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "12 March 2026"}, "checklist": ["Incident timeline, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Service level objective breach record, issued within the last 3 months.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months and signed.", "Follow-up owner assignment sheet, issued within the last 3 months and signed."], "submission": {"case": {"name": "production incident QS-14969", "reference": "CV-96947", "details": ["The incident was caused by a third-party service outage."]}, "cover note": "I am sorry that this pack was put together in a rush. I hope it reaches you in time for the review.", "documents received": ["Incident timeline concerning production incident QS-14969. It shows its date of issue as 8 February 2026. 3 pages, complete.", "Follow-up owner assignment sheet concerning production incident QS-14969. It shows its date of issue as 24 December 2025. Signed by the reliability engineering team lead. 1 page.", "Postmortem meeting minutes concerning production incident QS-14969. They show their date of issue as 11 February 2026. Signed by the meeting chair. 3 pages, complete.", "Root cause analysis report concerning production incident QS-14969. It shows its date of issue as 16 February 2026. Signed by the incident lead. 5 pages, complete.", "Vendor outage acknowledgement letter concerning production incident QS-14969. It shows its date of issue as 6 March 2026. Signed by the vendor's service manager. 1 page.", "The on-call duty roster for the month of the incident concerning production incident QS-14969. It shows its date of issue as 8 February 2026. 3 pages, complete.", "Service level objective breach record concerning production incident QS-14969. It shows its date of issue as 8 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete when checked against the checklist. Consider every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete: every applicable line is met (extra documents do not matter). Return incomplete: at least one applicable line is not met. Return unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-18", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 914}} {"id": "isc-te-00350-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Pravfell plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "19 August 2026"}, "checklist": ["Check the remediation items list, issued within the last 3 months, signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months, signed.", "Check the follow-up owner assignment sheet, issued within the last 3 months, signed.", "Check the postmortem meeting minutes, issued within the last 3 months, signed.", "Check the customer impact statement, issued within the last 3 months.", "If the incident involved a data leak to an outside party, also: data breach notification record, issued within the last 3 months, signed.", "Check the incident timeline, issued within the last 3 months."], "submission": {"case": {"name": "production incident ZQ-13927", "reference": "EV-82488", "details": ["The incident was caused entirely by internal systems.", "The incident involved a data leak to an outside party."]}, "documents received": ["Data breach notification record for production incident ZQ-13927, issued 20 July 2026, 2 pages, complete, signed by the data protection officer.", "Customer impact statement for production incident ZQ-13927, issued 9 July 2026, 2 pages, complete.", "Incident timeline for production incident ZQ-13927, issued 22 June 2026, 3 pages, complete.", "Follow-up owner assignment sheet for production incident ZQ-13927, issued 28 July 2026, single page, signed by the reliability engineering lead.", "Remediation items list for production incident ZQ-13927, issued 10 June 2026, 2 pages, complete, signed by the incident remediation lead.", "Postmortem meeting minutes for production incident ZQ-13927, issued 25 June 2026, 3 pages, complete, signed by the postmortem chair.", "Root cause analysis report for production incident ZQ-13927, issued 11 August 2026, 5 pages, complete, signed by the root cause analysis author.", "File scan_0147.pdf: the scan is blank and nothing on it can be seen."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 733}} {"id": "isc-te-00477-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Faldcourt BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "26 June 2026"}, "checklist": ["Previous grievance outcome letter issued within the last 24 months.", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed.", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed.", "Witness list, signed.", "Grievance procedure acknowledgement issued within the last 3 months, signed.", "Adjustment request record issued within the last 3 months, signed.", "Written grievance statement, signed."], "submission": {"case": {"name": "Chloe Clemby", "reference": "EW-81989", "details": ["The grievance is against the employee's direct manager.", "The grievance alleges bullying by a named colleague."]}, "documents received": ["Alternative manager reporting line note, Chloe Clemby, issued 5 June 2026, single page. Signed by the employee relations manager.", "Witness list, Chloe Clemby, issued 21 April 2026, single page. Signed by the case handler.", "Previous grievance outcome letter, Chloe Clemby, issued 8 July 2025. 2 pages, complete.", "Written grievance statement, Chloe Clemby, issued 19 April 2026. 3 pages, complete. Signed by Chloe Clemby.", "Bullying allegation evidence log, Chloe Clemby, issued 19 May 2026. 3 pages, complete. Signed by the employee relations manager.", "Adjustment request record, Chloe Clemby, single page, but the date is smudged and cannot be read. Signed by the occupational health adviser.", "Evidence bundle index, Chloe Clemby, issued 8 May 2026. 2 pages, complete. Signed by the case handler.", "Grievance procedure acknowledgement, Chloe Clemby, issued 16 May 2026, single page. Signed by Chloe Clemby."]}}, "question": {"type": "choice", "instructions": "The question to answer is whether the pack stands complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-63", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 838}} {"id": "isc-te-00294-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Ulmfield Inc", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "23 April 2026"}, "checklist": ["Check the location details sheet is present.", "Check the cost estimate is present, was issued within the last 3 months, and is signed.", "Check the job request form is present and is signed.", "Check the parts order confirmation is present and was issued within the last 1 months.", "If the job involves working at height above two metres, also check the permit to work at height is present, was issued within the last 1 months, and is signed.", "Check the access authorisation slip is present and is signed."], "submission": {"case": {"name": "maintenance request PZ-34030", "reference": "IX-99751", "details": ["The job involves working at height above two metres."]}, "documents received": ["A single-page access authorisation slip for maintenance request PZ-34030, dated 12 January 2026. It is signed by the site security manager.", "A cost estimate for maintenance request PZ-34030, dated 14 April 2026. It has 2 pages, complete. It is signed by the estimating manager.", "A risk assessment for the task under maintenance request PZ-34030, dated 10 February 2026. It has 5 pages, complete. It is signed by the assessing supervisor.", "A single-page location details sheet for maintenance request PZ-34030, dated 17 April 2026.", "A single-page job request form for maintenance request PZ-34030, dated 2 January 2026. It is signed by the requesting department manager.", "A single-page parts order confirmation for maintenance request PZ-34030, dated 10 April 2026."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00049-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Kenvston Ltd", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "24 April 2026"}, "checklist": ["If the audit found a major non-conformity, also: major non-conformity corrective action plan (signed)", "audit interview notes (signed)", "internal audit plan (issued within the last 12 months, signed)", "audit attendance sheet (signed)", "audit checklist for each area visited (signed)"], "submission": {"case": {"name": "internal audit CD-75948", "reference": "DM-54948", "details": ["The audit found no major non-conformities."]}, "documents received": ["audit_interview_notes_CD-75948.pdf - Audit interview notes for internal audit CD-75948. Date of issue: 2 February 2026. 3 pages, complete. Signed by the lead auditor.", "previous_audit_follow-up_record_CD-75948.pdf - Previous audit follow-up record for internal audit CD-75948. Date of issue: 25 August 2025. 2 pages, complete. Signed by the lead auditor.", "audit_attendance_sheet_CD-75948.pdf - Audit attendance sheet for internal audit CD-75948. Date of issue: 23 February 2026. 1 page. Signed by the lead auditor.", "internal_audit_plan_CD-75948.pdf - Internal audit plan for internal audit CD-75948. Date of issue: 23 December 2025. 2 pages, complete. Signed by the lead auditor.", "audit_checklist_CD-75948.pdf - Audit checklist for each area visited under internal audit CD-75948. Date of issue: 17 January 2026. 4 pages, complete. Signed by the lead auditor.", "file_0482.pdf - The file will not open, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 831}} {"id": "isc-te-00070-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Teskcrest SAS", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "15 September 2026"}, "checklist": ["Grant fund eligibility note, issued within the last 6 months, signed", "Training needs assessment, signed", "Installation requirements note", "Equipment purchase request form, signed", "Cost-benefit justification"], "submission": {"case": {"name": "equipment OJ-32008", "reference": "IV-17107"}, "documents received": ["Training needs assessment for equipment OJ-32008, dated 23 June 2026, 1 page, signed by the training coordinator.", "Installation requirements note for equipment OJ-32008, dated 30 June 2026, 2 pages, complete.", "Cost-benefit justification for equipment OJ-32008, dated 5 September 2026, 3 pages, complete.", "Equipment purchase request form for equipment OJ-32008, dated 8 July 2026, 2 pages, complete, signed by the requesting department head.", "Vendor quotation for equipment OJ-32008, dated 6 September 2026, 2 pages, complete.", "Grant fund eligibility note for equipment OJ-32008, dated 16 June 2026, 1 page, signed by the grants officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 700}} {"id": "isc-te-00436-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Ivrlund SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "6 March 2026"}, "checklist": ["Confirm that the points transfer request is present and signed", "Confirm that the identity verification document is present and valid, that is not expired, on the date of the review", "Confirm that the nominated store preference form is present and signed", "Confirm that the customer contact details sheet is present and signed", "Confirm that the terms and conditions acceptance sheet is present and signed", "Confirm that the marketing consent form is present and signed"], "submission": {"case": {"name": "Brooke Cormworth", "reference": "YP-76900"}, "documents received": ["Single-page customer contact details sheet dated 27 January 2026, concerning Brooke Cormworth. The sheet is signed by the member.", "Single-page terms and conditions acceptance sheet dated 30 November 2025, concerning Brooke Cormworth. The sheet is signed by the member.", "Single-page points transfer request dated 9 February 2026, concerning Brooke Cormworth. The request carries the signature of the transferring member.", "Single-page nominated store preference form dated 26 February 2026, concerning Brooke Cormworth. The form is signed by the member.", "Single-page initial points balance statement dated 4 February 2026, concerning Brooke Cormworth.", "Single-page identity verification document concerning Brooke Cormworth, showing an expiry date of 2 May 2026.", "Single-page marketing consent form dated 28 January 2026, concerning Brooke Cormworth. The form is signed by the member.", "Single-page loyalty scheme enrolment form dated 6 December 2025, concerning Brooke Cormworth. The form is signed by the member.", "Single-page newsletter subscription confirmation for a different shop, dated 28 January 2026, concerning Brooke Cormworth. The confirmation is signed by the member."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 810}} {"id": "isc-te-00271-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Ilvhurst SAS", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "23 March 2026"}, "checklist": ["Leaver notification form, signed", "Non-disclosure reminder acknowledgement, signed", "Final payroll cut-off note, signed, issued within the last 1 months", "Service desk ticket closure summary, issued within the last 1 months"], "submission": {"case": {"name": "Declan Vellridge", "reference": "QT-58639"}, "cover note": "Please could you approve this pack as soon as possible, as all the paperwork is in order.", "documents received": ["Leaver notification form for Declan Vellridge, issued 30 November 2025. 2 pages, complete. Signed by the line manager.", "Shared mailbox handover record for Declan Vellridge, issued 8 March 2026. 2 pages, complete. Signed by the line manager.", "Service desk ticket closure summary for Declan Vellridge, issued 9 March 2026. 3 pages, complete.", "Non-disclosure reminder acknowledgement for Declan Vellridge, issued 5 March 2026. Single page. Signed by the departing employee.", "Payslip from an earlier month for Declan Vellridge, issued 10 March 2026. Single page. Signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Examine each checklist line that applies here. A required document counts only if it is the kind of document listed (not a similar one), relates to the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can mislead, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-46", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 699}} {"id": "isc-te-00098-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Wynbury Inc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "6 May 2026"}, "checklist": ["Confirm the costed trip estimate sheet is present, was issued within the last 3 months, and is signed.", "If the requested advance is above the standard advance limit, also: confirm finance director approval for the higher advance is present and signed.", "If the trip involves travel to another country, also: confirm foreign travel authorisation from a director is present and signed.", "Confirm the outstanding advance clearance check is present and signed.", "Confirm the payroll deduction agreement for recovery of the advance is present and signed.", "Confirm the employee bank detail confirmation is present, was issued within the last 6 months, and is signed.", "Confirm the travel policy extract showing advance eligibility is present."], "submission": {"case": {"name": "Helen Tadton", "reference": "AX-34121", "details": ["The requested advance is within the standard advance limit.", "The trip involves travel to another country."]}, "documents received": ["bank_detail_confirmation_Tadton.pdf. An employee bank detail confirmation for Helen Tadton, dated 25 November 2025, on a single page. It is signed by the payroll officer, Joss Abidemi.", "line_manager_approval_Tadton.pdf. A line manager approval for the advance for Helen Tadton, dated 18 April 2026, on a single page. It is signed by the line manager, Gregor Haldane.", "payroll_deduction_agreement_Tadton.pdf. A payroll deduction agreement for recovery of the advance for Helen Tadton, dated 2 April 2026, on a single page. Its signature line is empty, so the document is not signed.", "costed_trip_estimate_Tadton.pdf. A costed trip estimate sheet for Helen Tadton, dated 24 March 2026, on a single page. It is signed by the travelling employee, Helen Tadton.", "foreign_travel_authorisation_Tadton.pdf. A foreign travel authorisation from a director for Helen Tadton, dated 1 May 2026, on a single page. It is signed by the authorising director, Kavell Renner.", "trip_itinerary_approval_Tadton.pdf. A trip itinerary and approval for Helen Tadton, dated 23 March 2026, 2 pages, complete. It is signed by the line manager, Gregor Haldane.", "outstanding_advance_clearance_Tadton.pdf. An outstanding advance clearance check for Helen Tadton, dated 26 March 2026, on a single page. It is signed by the accounts payable reviewer, Morwen Delacourt.", "travel_policy_extract_Tadton.pdf. A travel policy extract showing advance eligibility, dated 19 January 2026, on a single page, relating to Helen Tadton."]}}, "question": {"type": "choice", "instructions": "Your task is to decide whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-40", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1016}} {"id": "isc-te-00313-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Istshaw Partners", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "31 July 2026"}, "checklist": ["Cross-dock slot booking sheet, issued within the last 1 months and signed.", "Inbound unloading record, issued within the last 1 months and signed.", "Seal number log, issued within the last 1 months and signed.", "Transfer completion confirmation, issued within the last 1 months and signed.", "Load consolidation sheet, issued within the last 3 months and signed.", "If the transfer is an international movement, also: transit customs document, signed.", "Outbound loading record, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer TG-84110", "reference": "CV-81739", "details": ["The transfer is an international movement."]}, "cover note": "Please find attached everything needed for this transfer pack, which is complete. Let me know if anything further is required from my side.", "documents received": ["Inbound unloading record for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the inbound unloading supervisor.", "Transit customs document for cross-dock transfer TG-84110, dated 26 June 2026. 4 pages, complete. Signed by the customs agent.", "Transfer manifest for cross-dock transfer TG-84110, dated 22 May 2026. 3 pages, complete. Signed by the transport dispatcher.", "Seal number log for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the outbound gatekeeper.", "Damaged goods exception sheet for cross-dock transfer TG-84110, dated 10 July 2026. Single page. Signed by the warehouse operative.", "Outbound loading record for cross-dock transfer TG-84110, dated 24 July 2026. Single page. Signed by the outbound loading team leader.", "Cross-dock slot booking sheet for cross-dock transfer TG-84110, dated 21 July 2026. Single page. The signature line is blank, so it is not signed.", "Transfer completion confirmation for cross-dock transfer TG-84110, dated 12 July 2026. Single page. Signed by the transport planner.", "Load consolidation sheet for cross-dock transfer TG-84110, dated 26 July 2026. 2 pages, complete. Signed by the load consolidation coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 975}} {"id": "isc-te-00132-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravstow SAS", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "9 July 2026"}, "checklist": ["Transfer manifest, signed.", "Cross-dock slot booking sheet, issued within the last 1 months, signed.", "Damaged goods exception sheet, issued within the last 1 months, signed.", "Transfer completion confirmation, issued within the last 1 months, signed.", "Load consolidation sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "cross-dock transfer EQ-46599", "reference": "YF-29707"}, "documents received": ["Cross-dock slot booking sheet for cross-dock transfer EQ-46599. Date of issue: 27 June 2026. 1 page. Signed by the cross-dock coordinator.", "Damaged goods exception sheet for cross-dock transfer EQ-46599. Date of issue: 27 June 2026. 1 page. Signed by the warehouse operator.", "Inbound unloading record for cross-dock transfer EQ-46599. Date of issue: 7 July 2026. 1 page. Signed by the inbound unloading supervisor.", "Transfer completion confirmation for cross-dock transfer EQ-46599. The date of issue is covered by a stamp and cannot be read. 1 page. Signed by the cross-dock supervisor.", "Outbound loading record for cross-dock transfer EQ-46599. Date of issue: 4 July 2026. 1 page. Signed by the outbound loading supervisor.", "Transfer manifest for cross-dock transfer EQ-46599. Date of issue: 13 March 2026. 3 pages, complete. Signed by the transport planner.", "Load consolidation sheet for cross-dock transfer EQ-46599. Date of issue: 14 June 2026. 2 pages, complete. Signed by the load planner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 830}} {"id": "isc-te-00212-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Austbury plc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "13 July 2026"}, "checklist": ["Public liability insurance schedule", "Witness statement from a staff member, signed", "Liability claim form, signed", "CCTV footage stills of the incident, issued within the last 3 months", "Incident report from the day, issued within the last 3 months, signed", "Staff training record for the duty manager, issued within the last 24 months, signed"], "submission": {"case": {"name": "Boltdale plc", "reference": "IQ-71848"}, "documents received": ["Photographs of the spillage on the floor relating to Boltdale plc, dated 30 June 2026. Single page.", "Incident report from the day relating to Boltdale plc; the date on the document is smudged and cannot be read. 2 pages, complete, signed by the duty manager.", "Staff training record for the duty manager relating to Boltdale plc, dated 31 August 2025. 2 pages, complete, signed by the duty manager.", "Liability claim form relating to Boltdale plc, dated 6 May 2026. 3 pages, complete, signed by the claimant.", "CCTV footage stills of the incident relating to Boltdale plc, dated 25 May 2026. 2 pages, complete.", "Witness statement from a staff member relating to Boltdale plc, dated 3 July 2026. Single page, signed by the staff member.", "Public liability insurance schedule relating to Boltdale plc, dated 4 June 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete when checked against the checklist. Go through each line of the checklist that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-10", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 779}} {"id": "isc-te-00301-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Marlcliff Limited", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "3 March 2026"}, "checklist": ["Liability claim form, signed.", "Incident report from the day, issued within the last 3 months, signed.", "Photographs of the spillage on the floor, issued within the last 1 months.", "CCTV footage stills of the incident, issued within the last 3 months.", "Public liability insurance schedule.", "Cleaning log for the day of the incident, issued within the last 6 months, signed."], "submission": {"case": {"name": "Jundton Ltd", "reference": "EC-53915"}, "documents received": ["Liability claim form relating to Jundton Ltd, dated 30 January 2026. 3 pages, complete. Signed by the claimant.", "Incident report from the day relating to Jundton Ltd, dated 1 February 2026. 2 pages, complete. Signed by the duty manager.", "CCTV footage stills of the incident relating to Jundton Ltd, dated 24 February 2026. 2 pages, complete.", "Photographs of the spillage on the floor relating to Jundton Ltd, dated 25 February 2026. Single page.", "Cleaning log for the day of the incident relating to Jundton Ltd, dated 2 October 2025. Single page. Signed by the cleaner.", "Public liability insurance schedule relating to Jundton Ltd, dated 22 February 2026. 4 pages, complete.", "The shop's opening hours notice relating to Jundton Ltd, dated 1 February 2026. 2 pages, complete. Signed by the store manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 778}} {"id": "isc-te-00289-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Neskheim Ltd", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "2 June 2026"}, "checklist": ["Check that the course booking form is signed.", "Check that a prerequisite certificate is included.", "Check that the employer sponsorship letter was issued within the last 3 months and is signed.", "If the delegate requires an adjusted learning plan, also check that a learning support agreement is included and is signed.", "Check that a special requirements note is included.", "Check that the payment confirmation was issued within the last 3 months."], "submission": {"case": {"name": "course booking GA-88404", "reference": "DT-54396", "details": ["The delegate requires an adjusted learning plan."]}, "cover note": "Please can you confirm that everything needed is there, as I am not sure the pack is complete. The booking reference is DT-54396.", "documents received": ["Learning support agreement GA-88404.pdf. The agreement is dated 25 April 2026 and relates to course booking GA-88404. Single page, signed by the course tutor.", "Cancellation policy acceptance GA-88404.pdf. The acceptance is dated 15 May 2026 and concerns course booking GA-88404. Single page, signed by the delegate.", "Payment confirmation GA-88404.pdf. The confirmation is dated 29 March 2026 and refers to course booking GA-88404. Single page.", "Special requirements note GA-88404.pdf. The note is dated 13 February 2026 and concerns course booking GA-88404. Single page.", "Employer sponsorship letter GA-88404.pdf. The letter is dated 11 May 2026 and concerns course booking GA-88404. Single page, signed by the employer's HR manager.", "Prerequisite certificate GA-88404.pdf. The certificate is dated 21 February 2026 and relates to course booking GA-88404. Single page.", "Course booking form GA-88404.pdf. The form is dated 27 April 2026 and covers course booking GA-88404. 2 pages, complete, and signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete when measured against the checklist. Go over every checklist line relevant to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, contain all its pages, carry a signature wherever the checklist asks for one, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': all applicable lines are met (extra documents do not matter). 'incomplete': at least one applicable line is unmet. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-45", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 919}} {"id": "isc-te-00024-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lindgard BV", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "15 September 2026"}, "checklist": ["New floor snagging list, issued within the last 1 month and signed", "If the move takes place over a weekend, also: weekend security cover booking form, signed", "Crate hire agreement, signed", "Furniture inventory list, issued within the last 1 month and signed", "Parking bay suspension approval, issued within the last 1 month and signed", "Signed move plan, signed"], "submission": {"case": {"name": "office move project SN-2980", "reference": "YD-55373", "details": ["The move takes place on a weekday."]}, "documents received": ["Signed move plan for office move project SN-2980, dated 6 June 2026. 6 pages, complete. Signed by the project manager.", "File named scan_001.pdf. The file will not open, so its contents cannot be seen.", "Furniture inventory list for office move project SN-2980, dated 5 September 2026. 4 pages, complete. Signed by the facilities coordinator.", "Crate hire agreement for office move project SN-2980, dated 6 August 2026. 2 pages, complete. Signed by the crate hire supplier.", "Parking bay suspension approval for office move project SN-2980, dated 6 September 2026. Single page. Signed by the local authority parking officer.", "New floor snagging list for office move project SN-2980, dated 29 August 2026. 3 pages, complete. Signed by the site manager."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 578}} {"id": "isc-te-00464-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Quelfell Ltd", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "15 April 2026"}, "checklist": ["If the property is being bought from a family member, also: independent purchase price assessment (issued within the last 3 months, signed)", "Mortgage application form (signed)", "Photo identity document (valid (not expired) on the date of the review)", "Property valuation report (issued within the last 6 months, signed)", "Employment certificate (issued within the last 1 months, signed)", "Sale and purchase agreement (signed)", "Proof of deposit (issued within the last 3 months)"], "submission": {"case": {"name": "property FN-50742", "reference": "TZ-90153"}, "documents received": ["TZ-90153 Photo identity document.pdf — Photo identity document relating to property FN-50742. Expiry date: 29 April 2028. Single page.", "TZ-90153 Bank statement.pdf — Bank statement relating to property FN-50742. Date of issue: 2 March 2026. 3 pages, complete.", "TZ-90153 Credit bureau report.pdf — Credit bureau report relating to property FN-50742. Date of issue: 13 April 2026. 4 pages, complete.", "TZ-90153 Property valuation report.pdf — Property valuation report for property FN-50742. Date of issue: 24 March 2026. 10 pages, complete. Signed by the valuer.", "TZ-90153 Mortgage application form.pdf — Mortgage application form for property FN-50742. Date of issue: 25 January 2026. 6 pages, complete. Signed by the applicant.", "TZ-90153 Employment certificate.pdf — Employment certificate relating to property FN-50742. Date of issue: 30 March 2026. Single page. Signed by the employer.", "TZ-90153 Sale and purchase agreement.pdf — Sale and purchase agreement for property FN-50742. Date of issue: 26 December 2025. 9 pages, complete. Signed by the buyer and the seller.", "TZ-90153 Proof of deposit.pdf — Proof of deposit relating to property FN-50742. Date of issue: 2 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 943}} {"id": "isc-te-00060-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Glengard Group", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "3 April 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed", "Certificate of insurance, valid (not expired) on the date of the review", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid (not expired) on the date of the review", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed", "Supplier registration form, signed", "Anti-bribery policy statement, signed", "Certificate of incorporation", "Supplier declaration of no conflicts of interest, signed"], "submission": {"case": {"name": "Austwyn Limited", "reference": "LU-89623", "details": ["The supplier is a small business with a single owner.", "The supplier is a domestic company."]}, "documents received": ["Supplier declaration of no conflicts of interest for Austwyn Limited. Dated 27 March 2026, 1 page, signed by the supplier's managing director.", "Bank details confirmation letter for Austwyn Limited. Dated 21 March 2026, 1 page, signed by the supplier's finance manager.", "Certificate of insurance for Austwyn Limited. Shows an expiry date of 5 July 2028, 2 pages, complete.", "Anti-bribery policy statement for Austwyn Limited. Dated 11 January 2026, 2 pages, complete, signed by the supplier's managing director.", "Certificate of incorporation for Austwyn keep name consistent: Austwyn Limited. Dated 7 January 2026, 2 pages, complete.", "Copy of the owner's photo identification for Austwyn Limited. Shows an expiry date of 28 May 2027, 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00386-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Orrston BV", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "18 May 2026"}, "checklist": ["Signed trial period proposal", "Line manager opinion note, signed and issued within the last 2 months", "Current working pattern statement issued within the last 3 months", "Previous flexible working requests record issued within the last 24 months", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed", "If the request is to work entirely from home, also: home working equipment checklist, signed"], "submission": {"case": {"name": "Daan Kerrridge", "reference": "XS-33835", "details": ["The employee has caring responsibilities for a dependent.", "The request is not to work entirely from home."]}, "cover note": "Everything needed is attached and complete.", "documents received": ["Scan XS-33835 item 8.pdf - The file will not open, so its contents cannot be seen.", "Line manager opinion note - Daan Kerrridge.pdf - Line manager opinion note concerning Daan Kerrridge, dated 10 May 2026. It is 2 pages, complete, and is signed by the line manager.", "Caring responsibilities statement - Daan Kerrridge.pdf - Caring responsibilities statement concerning Daan Kerrridge, dated 8 May 2026. It is 1 page and is signed by Daan Kerrridge.", "Proposed working pattern plan - Daan Kerrridge.pdf - Proposed working pattern plan concerning Daan Kerrridge, dated 9 May 2026. It is 2 pages, complete, and is signed by the line manager.", "Trial period proposal - Daan Kerrridge.pdf - Trial period proposal concerning Daan Kerrridge, dated 27 March 2026. It is 1 page and is signed by the line manager.", "Current working pattern statement - Daan Kerrridge.pdf - Current working pattern statement concerning Daan Kerrridge, dated 10 April 2026. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 827}} {"id": "isc-te-00261-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Istcrest plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "21 August 2026"}, "checklist": ["Check that the pack contains a customer impact statement issued within the last 3 months.", "Check that the pack contains a root cause analysis report issued within the last 3 months and signed.", "Check that the pack contains postmortem meeting minutes issued within the last 3 months and signed.", "Check that the pack contains a service level objective breach record issued within the last 3 months."], "submission": {"case": {"name": "production incident OW-67810", "reference": "MF-56865"}, "documents received": ["Customer impact statement about production incident OW-67810. It shows its date of issue as 19 August 2026. 2 pages, complete.", "Press release about a new product launch about production incident OW-67810. It shows its date of issue as 19 August 2026. 2 pages, complete.", "Postmortem meeting minutes about production incident OW-67810. It shows its date of issue as 25 June 2026. 3 pages, complete. It is signed by the chair of the postmortem meeting.", "Root cause analysis report about production incident OW-67810. It shows its date of issue as 7 July 2026. 5 pages, complete. It is signed by the reliability engineering lead.", "Alerting rules review note about production incident OW-67810. It shows its date of issue as 13 June 2026. 2 pages, complete.", "Service level objective breach record about production incident OW-67810. It shows its date of issue as 7 August 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 794}} {"id": "isc-te-00043-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Austmere LLP", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "2 September 2026"}, "checklist": ["Racking inspection report, issued within the last 12 months and signed.", "Signed lease agreement.", "Planning permission.", "Fire safety certificate, valid (not expired) on the date of the review.", "Asbestos survey."], "submission": {"case": {"name": "warehouse BB-20125", "reference": "KU-84726"}, "documents received": ["BB-20125_floor_load_capacity_report_2026-06-29.pdf. Floor load capacity report for warehouse BB-20125, dated 29 June 2026, 3 pages, complete. It is signed by the structural engineer.", "BB-20125_warehouse_insurance_policy_expires_2029-02-09.pdf. Warehouse insurance policy for warehouse BB-20125, with an expiry date of 9 February 2029, 6 pages, complete.", "BB-20125_asbestos_survey_2026-05-17.pdf. Asbestos survey for warehouse BB-20125, dated 17 May 2026, 5 pages, complete.", "BB-20125_planning_permission_2026-07-06.pdf. Planning permission for warehouse BB-20125, dated 6 July 2026, 2 pages, complete.", "BB-20125_fire_safety_certificate_expires_2026-10-18.pdf. Fire safety certificate for warehouse BB-20125, with an expiry date of 18 October 2026, 2 pages, complete.", "BB-20125_racking_inspection_report_2026-05-28_v2.pdf. Racking inspection report for warehouse BB-20125, dated 28 May 2026, showing page 1 of 1; no total page count appears anywhere in the document. It is signed by the inspecting engineer.", "BB-20125_lease_agreement_2026-06-13.pdf. Signed lease agreement for warehouse BB-20125, dated 13 June 2026, 8 pages, complete. It is signed by the landlord and the tenant."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Go through all checklist lines that apply to this case. To count, a required document must be the kind of document listed rather than a similar one, must be about the subject of the case, must have all its pages, must be signed wherever the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-62", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 953}} {"id": "isc-te-00330-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Marlmoor GmbH", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "17 April 2026"}, "checklist": ["Line manager approval, signed", "If the traveller is not a passport holder of the destination country, also: work permit confirmation", "Visa entry requirement printout, issued within the last 3 months", "Flight itinerary quote, issued within the last 1 months", "Travel request form, signed", "If the trip involves travel to a country requiring a visa, also: visa approval letter", "Hotel booking confirmation"], "submission": {"case": {"name": "business trip LT-79663", "reference": "RA-34404", "details": ["The traveller holds a passport of the destination country.", "The trip involves travel to a country requiring a visa."]}, "documents received": ["travel request form LT-79663. It is a travel request form for business trip LT-79663, dated 21 March 2026. 2 pages, complete. It is signed by the traveller.", "visa entry requirement printout LT-79663. It is a visa entry requirement printout for business trip LT-79663, dated 8 February 2026. 2 pages, complete.", "hotel booking confirmation LT-79663. It is a hotel booking confirmation for business trip LT-79663, dated 25 January 2026. 2 pages, complete.", "line manager approval LT-79663. It is a single-page line manager approval for business trip LT-79663, dated 10 March 2026, and it is signed by the traveller's line manager.", "visa approval letter LT-79663. It is a visa approval letter for business trip LT-79663, dated 28 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 814}} {"id": "isc-te-00382-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Norvwater Group", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "14 May 2026"}, "checklist": ["Confirm the planned completion date sheet is included and signed.", "Confirm the location details sheet is included.", "Confirm the access authorisation slip is included and signed.", "Confirm the parts order confirmation is included and was issued within the last 1 months.", "Confirm the cost estimate is included, was issued within the last 3 months, and is signed."], "submission": {"case": {"name": "maintenance request AM-49331", "reference": "TF-32348"}, "cover note": "This pack has already been checked by a colleague, so it should be ready to move forward from your side.", "documents received": ["AM-49331_planned_completion_date_sheet.pdf - Planned completion date sheet for maintenance request AM-49331, dated 26 January 2026. Single page. Signed by the maintenance supervisor.", "AM-49331_access_authorisation_slip.pdf - Access authorisation slip for maintenance request AM-49331, dated 25 January 2026. Single page. Signed by the security manager.", "AM-49331_parts_order_confirmation.pdf - Parts order confirmation for maintenance request AM-49331, dated 24 April 2026. Single page.", "AM-49331_photographs_of_the_fault.pdf - Photographs of the fault for maintenance request AM-49331, dated 10 May 2026. 2 pages, complete.", "AM-49331_job_request_form.pdf - Job request form for maintenance request AM-49331, dated 6 May 2026. Single page. Signed by the requesting manager.", "AM-49331_cost_estimate_5February2026.pdf - Cost estimate for maintenance request AM-49331, dated 5 February 2026. 2 pages, complete. Signed by the estimating officer.", "AM-49331_location_details_sheet.pdf - Location details sheet for maintenance request AM-49331, dated 2 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 883}} {"id": "isc-te-00090-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Uldvale LLP", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "27 April 2026"}, "checklist": ["Asset register update, issued within the last 1 months.", "Decommission request form, signed.", "Final backup confirmation, issued within the last 3 months, signed.", "Data migration confirmation, issued within the last 3 months, signed.", "Dependent systems check report, issued within the last 3 months.", "Licence reassignment note, issued within the last 3 months, signed.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server HC-85039", "reference": "XH-31889", "details": ["The server holds archived records that must be kept."]}, "cover note": "A colleague has already been through this pack and confirmed it was reviewed. There is no need to check it again at your end.", "documents received": ["Asset register update for retired server HC-85039, dated 15 April 2026. Single page.", "Archive retention confirmation for retired server HC-85039, dated 28 March 2026. 2 pages, complete. Signed by the records manager.", "Final backup confirmation for retired server HC-85039, dated 26 March 2026. Single page. Signed by the backup administrator.", "Data migration confirmation for retired server HC-85039, dated 25 March 2026. 2 pages, complete. Signed by the systems migration lead.", "Dependent systems check report for retired server HC-85039, dated 21 March 2026. 3 pages, complete.", "Data wipe certificate for retired server HC-85039, dated 9 February 2026. Single page. Signed by the data sanitisation technician.", "Decommission request form for retired server HC-85039, dated 5 January 2026. 2 pages, complete. Signed by the infrastructure operations team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 867}} {"id": "isc-te-00108-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Austwald plc", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "11 September 2026"}, "checklist": ["Cancellation policy acceptance, signed.", "Venue access instructions, issued within the last 3 months.", "Prerequisite certificate.", "Employer sponsorship letter, issued within the last 3 months and signed.", "Delegate photo identification, valid (not expired) on the date of the review."], "submission": {"case": {"name": "course booking CV-74926", "reference": "ID-51962"}, "documents received": ["delegate_photo_identification_CV-74926.pdf - Delegate photo identification for course booking CV-74926, showing an expiry date of 10 December 2026. It is a single page.", "venue_access_instructions_CV-74926.pdf - Venue access instructions for course booking CV-74926, dated 30 July 2026. It is a single page.", "employer_sponsorship_letter_CV-74926.pdf - Employer sponsorship letter for course booking CV-74926, dated 22 June 2026. It is a single page. It is signed by the employer's human resources manager.", "cancellation_policy_acceptance_CV-74926.pdf - Cancellation policy acceptance for course booking CV-74926, dated 2 September 2026. It is a single page. A sticky note covers the part where a signature would be, so it is not known whether it is signed.", "prerequisite_certificate_CV-74926.pdf - Prerequisite certificate for course booking CV-74926, dated 11 July 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 779}} {"id": "isc-te-00236-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Haskmont Group", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "4 March 2026"}, "checklist": ["Scaffolding agreement, signed", "Insurance notification letter, issued within the last 6 months", "Meter reading photo, issued within the last 1 months", "Grid connection application, issued within the last 12 months, signed", "Planning permission letter, issued within the last 12 months"], "submission": {"case": {"name": "roof OS-53775", "reference": "WL-45574"}, "cover note": "Please accept my apologies that this pack was put together in a rush. If anything needs clarifying, do get in touch.", "documents received": ["Meter reading photo for roof OS-53775, dated 28 February 2026. Single page.", "Insurance notification letter for roof OS-53775, dated 29 December 2025. Single page.", "Scaffolding agreement for roof OS-53775, dated 1 February 2026. 2 pages, complete. Signed by the property owner.", "Grid connection application for roof OS-53775, dated 22 November 2025. 2 pages, complete. Signed by the property owner.", "Roof structural report for roof OS-53775, dated 26 September 2025. 4 pages, complete. Signed by the surveyor.", "Electricity bill direct debit mandate for roof OS-53775, dated 22 November 2025. 2 pages, complete. Signed by the account holder.", "Survey booking form for roof OS-53775, dated 3 January 2026. Single page. Signed by the property owner.", "Planning permission letter for roof OS-53775, dated 18 March 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Review every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-71", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 823}} {"id": "isc-te-00482-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Delvcrest plc", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "24 April 2026"}, "checklist": ["Check the pack contains the purchase invoice for the machine.", "Check the pack contains the machine maintenance log, issued within the last 6 months.", "If the breakdown spoiled perishable stock, also: spoiled stock disposal certificate, issued within the last 3 months, signed.", "Check the pack contains the repair or replacement quotation, issued within the last 3 months.", "Check the pack contains the policy machinery schedule.", "If a temporary machine was hired to keep production going, also: temporary hire agreement for replacement machinery, issued within the last 3 months, signed."], "submission": {"case": {"name": "failed machine TK-72580", "reference": "JA-96370", "details": ["The breakdown spoiled no perishable stock.", "No temporary machine was hired to keep production going."]}, "documents received": ["Policy machinery schedule for failed machine TK-72580. Dated 29 March 2026. 3 pages, complete.", "Purchase invoice for the machine failed machine TK-72580. Dated 9 February 2026. 1 page.", "Engineer's fault diagnosis report for failed machine TK-72580. Dated 16 April 2026. 4 pages, complete. Signed by the inspecting engineer.", "Repair or replacement quotation for failed machine TK-72580. Dated 22 February 2026. 2 pages, complete.", "Machine maintenance log for failed machine TK-72580. The date of issue is covered by a stamp and cannot be read. 5 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 770}} {"id": "isc-te-00277-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Holham Ltd", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "16 April 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed.", "Payroll deduction agreement for recovery of the advance, signed.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Line manager approval for the advance, signed.", "Costed trip estimate sheet, issued within the last 3 months and signed.", "Travel policy extract showing advance eligibility."], "submission": {"case": {"name": "Xiu Yellisey", "reference": "OK-65774", "details": ["The requested advance is within the standard advance limit."]}, "documents received": ["Line manager approval for the advance for Xiu Yellisey, dated 24 December 2025. Single page. Signed by the line manager.", "Costed trip estimate sheet for Xiu Yellisey, dated 2 March 2026. Single page. Signed by the line manager.", "Outstanding advance clearance check for Xiu Yellisey, dated 28 February 2026. Single page. Signed by the accounts payable reviewer.", "Travel policy extract showing advance eligibility for Xiu Yellisey, dated 27 December 2025. Single page.", "Trip itinerary and approval for Xiu Yellisey. The date field is covered by an ink stamp, so the date of issue cannot be read. 2 pages, complete. Signed by the line manager.", "Payroll deduction agreement for recovery of the advance for Xiu Yellisey, dated 11 January 2026. Single page. Signed by the employee, Xiu Yellisey."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 773}} {"id": "isc-te-00482-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Delvcrest plc", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "24 April 2026"}, "checklist": ["Check the pack contains the purchase invoice for the machine.", "Check the pack contains the machine maintenance log, issued within the last 6 months.", "If the breakdown spoiled perishable stock, also: spoiled stock disposal certificate, issued within the last 3 months, signed.", "Check the pack contains the repair or replacement quotation, issued within the last 3 months.", "Check the pack contains the policy machinery schedule.", "If a temporary machine was hired to keep production going, also: temporary hire agreement for replacement machinery, issued within the last 3 months, signed."], "submission": {"case": {"name": "failed machine TK-72580", "reference": "JA-96370", "details": ["The breakdown spoiled no perishable stock.", "No temporary machine was hired to keep production going."]}, "cover note": "Could you approve this one quickly? All the paperwork is in order.", "documents received": ["Machine maintenance log for failed machine TK-72580. The date of issue is covered by a stamp and cannot be read. 5 pages, complete.", "Engineer's fault diagnosis report for failed machine TK-72580. Dated 16 April 2026. 4 pages, complete. Signed by the inspecting engineer.", "Repair or replacement quotation for failed machine TK-72580. Dated 22 February 2026. 2 pages, complete.", "Policy machinery schedule for failed machine TK-72580. Dated 29 March 2026. 3 pages, complete.", "Purchase invoice for the machine failed machine TK-72580. Dated 9 February 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 789}} {"id": "isc-te-00241-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Glenside Ltd", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "2 March 2026"}, "checklist": ["Service level summary, issued within the last 12 months", "Corrective action plan, issued within the last 6 months, signed", "Contract compliance checklist, signed", "Supplier performance scorecard, signed", "Invoice discrepancy log"], "submission": {"case": {"name": "Varnridge Partners", "reference": "SE-38332"}, "documents received": ["Contract compliance checklist - Varnridge Partners.pdf. The document is a contract compliance checklist about Varnridge Partners, dated 30 January 2026, with 3 pages, complete. It is signed by the procurement officer.", "Invoice discrepancy log - Varnridge Partners.pdf. The document is an invoice discrepancy log about Varnridge Partners, dated 7 December 2025, with 2 pages, complete.", "Supplier performance scorecard - Varnridge Partners.pdf. The document is a supplier performance scorecard about Varnridge Partners, dated 6 February 2026, with 2 pages, complete. It is signed by the category manager.", "Corrective action plan - Varnridge Partners.pdf. The document is a corrective action plan about Varnridge Partners, dated 23 December 2025, with 2 pages, complete. It is signed by the supplier's account manager.", "Bank statement - Varnridge Partners.pdf. The document is a bank statement showing payments made about Varnridge Partners, dated 7 December 2025, with 2 pages, complete.", "Service level summary - Varnridge Partners.pdf. The document is a service level summary about Varnridge Partners, dated 20 May 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 774}} {"id": "isc-te-00282-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Briskmere GmbH", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "18 June 2026"}, "checklist": ["Proof of registered office address, issued within the last 3 months", "Board resolution to open the account, signed", "Company tax registration certificate", "Certificate of incorporation", "If the company operates in a cash-intensive trade, also: cash handling policy, signed"], "submission": {"case": {"name": "Norvhurst SAS", "reference": "HH-86347", "details": ["The company operates in a cash-intensive trade."]}, "cover note": "Please find attached everything needed for this pack, complete as required. Happy to send anything further if useful.", "documents received": ["Scanned company tax registration certificate for Norvhurst SAS, dated 25 March 2026. Single page.", "Scanned proof of registered office address for Norvhurst SAS; the date is covered by a stamp and cannot be read. Single page.", "Scanned certificate of incorporation for Norvhurst SAS, dated 10 June 2026. Single page.", "Scanned board resolution to open the account for Norvhurst SAS, dated 3 May 2026. Single page, signed by the chairman of the board.", "Scanned cash handling policy for Norvhurst SAS, dated 4 May 2026. 2 pages, complete. Signed by the managing director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 695}} {"id": "isc-te-00342-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Hondhurst Group", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "6 April 2026"}, "checklist": ["If the institute hosts research involving human participants, also: ethics committee annual return (issued within the last 12 months, signed)", "doctoral researcher progress summary (issued within the last 6 months, signed)", "director's declaration of interests (issued within the last 12 months, signed)", "staffing plan (issued within the last 6 months, signed)", "annual activity report (issued within the last 6 months, signed)", "financial expenditure summary (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Oxlbury Inc", "reference": "QW-70395", "details": ["The institute hosts research involving human participants."]}, "documents received": ["staffing plan.pdf — A staffing plan for Oxlbury Inc, dated 24 October 2025. It runs to 2 pages, complete, and is signed by the institute director.", "doctoral researcher progress summary.pdf — A doctoral researcher progress summary for Oxlbury Inc, dated 4 January 2026. It runs to 2 pages, complete, and is signed by the doctoral researcher's supervisor.", "annual activity report.pdf — An annual activity report for Oxlbury Inc, dated 31 October 2025. It runs to 12 pages, complete, and is signed by the institute director.", "ethics committee annual return.pdf — An ethics committee annual return for Oxlbury Inc, dated 10 May 2025. It runs to 2 pages, complete, and carries the signature of the ethics committee chair.", "publications list.pdf — A publications list for Oxlbury Inc, dated 30 December 2025. It runs to 4 pages, complete.", "financial expenditure summary.pdf — A financial expenditure summary for Oxlbury Inc, dated 27 January 2026. It runs to 3 pages, complete, and is signed by the institute finance officer.", "directors declaration of interests.pdf — A director's declaration of interests for Oxlbury Inc, issued as a single page. The date of issue is covered by a receipt stamp, so it cannot be read. The page bears the director's signature."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-65", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 894}} {"id": "isc-te-00476-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Elstton Partners", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "13 August 2026"}, "checklist": ["Leave balance statement issued within the last 3 months.", "Completed annual leave request form, signed.", "Manager approval email issued within the last 2 months.", "Return to work date confirmation.", "Statutory holiday entitlement confirmation.", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave, signed.", "Team holiday planner extract."], "submission": {"case": {"name": "Khalid Sabnall", "reference": "ZF-30873", "details": ["The employee is not requesting leave during a known busy period."]}, "documents received": ["Contact plan for time away for Khalid Sabnall, issued 4 June 2026. Single page.", "Manager approval email for Khalid Sabnall, issued 8 July 2026. Single page.", "Team holiday planner extract for Khalid Sabnall, issued 18 May 2026. 2 pages, complete.", "Leave balance statement for Khalid Sabnall, issued 16 June 2026. Single page.", "Completed annual leave request form for Khalid Sabnall, issued 19 June 2026. Single page, signed by the employee.", "Return to work date confirmation for Khalid Sabnall, issued 16 July 2026. Single page.", "File named file_0043.pdf. The scan is blank and the contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 730}} {"id": "isc-te-00083-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Pravholm SAS", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "23 March 2026"}, "checklist": ["Confirm the pack contains a localisation completeness report issued within the last 1 months.", "Confirm the pack contains a store listing description issued within the last 1 months.", "Confirm the pack contains a crash-free rate report issued within the last 1 months.", "Confirm the pack contains a privacy policy update issued within the last 3 months.", "If the mobile app release adds a new payment feature, also confirm the pack contains a payment provider compliance checklist issued within the last 3 months and signed.", "Confirm the pack contains a marketing screenshot pack.", "If the mobile app release includes third-party analytics, also confirm the pack contains an analytics data consent statement issued within the last 3 months and signed.", "Confirm the pack contains an age rating questionnaire that is signed."], "submission": {"case": {"name": "mobile app release QZ-19484", "reference": "HT-41661", "details": ["The mobile app release adds a new payment feature.", "The mobile app release includes no third-party analytics."]}, "documents received": ["Crash-free rate report, mobile app release QZ-19484. Date of issue: 18 March 2026. Single page.", "Age rating questionnaire, mobile app release QZ-19484. Date of issue: 14 February 2026. 2 pages, complete. The signature line is empty; the document is not signed.", "Payment provider compliance checklist, mobile app release QZ-19484. Date of issue: 11 February 2026. 3 pages, complete. Signed by the team lead.", "Privacy policy update, mobile app release QZ-19484. Date of issue: 7 January 2026. 2 pages, complete.", "Marketing screenshot pack, mobile app release QZ-19484. Date of issue: 17 March 2026. 6 pages, complete.", "Localisation completeness report, mobile app release QZ-19484. Date of issue: 12 March 2026. 2 pages, complete.", "Store listing description, mobile app release QZ-19484. Date of issue: 7 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "partial", "defect": "not signed", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 917}} {"id": "isc-te-00370-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Cindford BV", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "12 August 2026"}, "checklist": ["Employment certificate, issued within the last 1 months and signed", "Photo identity document, valid (not expired) on the date of the review", "Property valuation report, issued within the last 6 months and signed", "Bank statement, issued within the last 3 months", "Credit bureau report, issued within the last 1 months", "If the property is a new build, also: new build warranty certificate"], "submission": {"case": {"name": "property YV-75629", "reference": "EX-15818", "details": ["The property is a new build."]}, "cover note": "I am not sure everything needed is in this pack.", "documents received": ["New build warranty certificate. It concerns property YV-75629 and shows its date of issue as 27 June 2026. It is 3 pages, complete.", "Mortgage application form. It concerns property YV-75629 and shows its date of issue as 23 June 2026. It is 6 pages, complete, and signed by the applicant.", "Employment certificate. It concerns property YV-75629 and shows its date of issue as 28 July 2026. It is 1 page and signed by the applicant's employer.", "Bank statement. It concerns property YV-75629 and shows its date of issue as 22 June 2026. It is 3 pages, complete.", "Credit bureau report. It concerns property YV-75629 and shows its date of issue as 22 July 2026. It is 4 pages, complete.", "Proof of deposit. It concerns property YV-75629 and shows its date of issue as 1 July 2026. It is 1 page.", "Property valuation report. It concerns property YV-75629 and shows its date of issue as 25 February 2026. It is 10 pages, complete, and signed by the valuer.", "Photo identity document. It concerns property YV-75629 and shows its expiry date as 4 November 2028. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 910}} {"id": "isc-te-00250-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Istfield & Co", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "4 May 2026"}, "checklist": ["If the institute received industry funding above the university's disclosure threshold, also include: industry funding disclosure statement (issued within the last 12 months, signed)", "Include: director's declaration of interests (issued within the last 12 months, signed)", "Include: external advisory board minutes (issued within the last 12 months, signed)", "Include: staffing plan (issued within the last 6 months, signed)", "If the institute hosts research involving human participants, also include: ethics committee annual return (issued within the last 12 months, signed)", "Include: publications list (issued within the last 12 months)", "Include: annual activity report (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Lombfeld Ltd", "reference": "EI-33164", "details": ["The institute received industry funding above the university's disclosure threshold.", "The institute hosts research involving human participants."]}, "documents received": ["EI-33164_Publications_list_2025-09-20.pdf - Publications list for Lombfeld Ltd, dated 20 September 2025. 4 pages, complete.", "EI-33164_Intellectual_property_register_extract_2026-02-01.pdf - Intellectual property register extract for Lombfeld Ltd, dated 1 February 2026. Single page. Signed by the institute director.", "EI-33164_Ethics_committee_annual_return_2025-12-28.pdf - Ethics committee annual return for Lombfeld Ltd, dated 28 December 2025. 2 pages, complete. Signed by the ethics committee chair.", "EI-33164_Industry_funding_disclosure_statement_2025-11-17.pdf - Industry funding disclosure statement for Lombfeld Ltd, dated 17 November 2025. Single page. Signed by the institute director.", "EI-33164_Staffing_plan_2026-03-31.pdf - Staffing plan for Lombfeld Ltd, dated 31 March 2026. 2 pages, complete. Signed by the institute director.", "EI-33164_Annual_activity_report_2025-11-25.pdf - Annual activity report for Lombfeld Ltd, dated 25 November 2025. 12 pages, complete. Signed by the institute director.", "EI-33164_Directors_declaration_of_interests_2025-05-15.pdf - Director's declaration of interests for Lombfeld Ltd, dated 15 May 2025. Single page. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1024}} {"id": "isc-te-00083-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Pravholm SAS", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "23 March 2026"}, "checklist": ["Confirm the pack contains a localisation completeness report issued within the last 1 months.", "Confirm the pack contains a store listing description issued within the last 1 months.", "Confirm the pack contains a crash-free rate report issued within the last 1 months.", "Confirm the pack contains a privacy policy update issued within the last 3 months.", "If the mobile app release adds a new payment feature, also confirm the pack contains a payment provider compliance checklist issued within the last 3 months and signed.", "Confirm the pack contains a marketing screenshot pack.", "If the mobile app release includes third-party analytics, also confirm the pack contains an analytics data consent statement issued within the last 3 months and signed.", "Confirm the pack contains an age rating questionnaire that is signed."], "submission": {"case": {"name": "mobile app release QZ-19484", "reference": "HT-41661", "details": ["The mobile app release adds a new payment feature.", "The mobile app release includes no third-party analytics."]}, "documents received": ["Age rating questionnaire, mobile app release QZ-19484. Date of issue: 14 February 2026. 2 pages, complete. Signed by the release manager.", "Privacy policy update, mobile app release QZ-19484. Date of issue: 7 January 2026. 2 pages, complete.", "Localisation completeness report, mobile app release QZ-19484. Date of issue: 12 March 2026. 2 pages, complete.", "Device compatibility matrix, mobile app release QZ-19484. Date of issue: 25 January 2026. 2 pages, complete.", "File: item_01.pdf. The file will not open, so its contents cannot be seen.", "Marketing screenshot pack, mobile app release QZ-19484. Date of issue: 17 March 2026. 6 pages, complete.", "Payment provider compliance checklist, mobile app release QZ-19484. Date of issue: 11 February 2026. 3 pages, complete. Signed by the team lead.", "Crash-free rate report, mobile app release QZ-19484. Date of issue: 18 March 2026. Single page.", "Store listing description, mobile app release QZ-19484. Date of issue: 7 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 970}} {"id": "isc-te-00235-p1-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Tarvcliff plc", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "1 June 2026"}, "checklist": ["Check for proof of deposit savings, issued within the last 3 months.", "Check for mortgage application form, issued within the last 3 months and signed.", "Check for property valuation report, issued within the last 3 months and signed.", "Check for gifted deposit letter, issued within the last 3 months and signed.", "If the property being bought is a flat in a shared building, also check for management company pack, issued within the last 3 months."], "submission": {"case": {"name": "Pablo Drumsall", "reference": "TQ-86071", "details": ["The property being bought is a flat in a shared building."]}, "documents received": ["Mortgage application form. Application in the name of Pablo Drumsall. Date of issue: 3 April 2026. 10 pages, complete. Signed by the borrower.", "Property valuation report. Report prepared for Pablo Drumsall. Date of issue: 13 April 2026. 8 pages, complete. Signed by the valuer.", "Proof of deposit savings. Statement in the name of Pablo Drumsall. Date of issue: 25 March 2026. 2 pages, complete.", "Management company pack. Pack for the property being bought by Pablo Drumsall. Date of issue: 22 March 20217. 12 pages, complete.", "P60 tax summary. P60 in the name of Pablo Drumsall. Date of issue: 10 July 2025. 2 pages, complete.", "Gifted deposit letter. Letter regarding Pablo Drumsall. Date of issue: 17 May 2026. 1 page. Signed by the giftor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 794}} {"id": "isc-te-00351-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vaskfield Partners", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "10 September 2026"}, "checklist": ["Follow-up owner assignment sheet, issued within the last 3 months, signed.", "Root cause analysis report, issued within the last 3 months, signed.", "Incident timeline, issued within the last 3 months.", "Alerting rules review note, issued within the last 3 months."], "submission": {"case": {"name": "production incident MR-6892", "reference": "GL-79533"}, "documents received": ["On-call duty roster for the month of the incident, production incident MR-6892, dated 19 August 2026. 3 pages, complete.", "Follow-up owner assignment sheet for production incident MR-6892, dated 23 August 2026. Single page, signed by the reliability engineering lead.", "Alerting rules review note for production incident MR-6892, dated 15 August 2026. 2 pages, complete.", "Root cause analysis report on production incident MR-6892, dated 24 July 2026. 5 pages, complete. Signed by the reliability engineering lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 662}} {"id": "isc-te-00172-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Ebrwick plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "13 August 2026"}, "checklist": ["Alerting rules review note, issued within the last 3 months", "Root cause analysis report, issued within the last 3 months and signed", "Incident timeline, issued within the last 3 months", "Service level objective breach record, issued within the last 3 months", "Remediation items list, issued within the last 3 months and signed", "Customer impact statement, issued within the last 3 months"], "submission": {"case": {"name": "production incident RZ-3062", "reference": "KV-98742"}, "documents received": ["Incident timeline concerning production incident RZ-3062, dated 2 June 2026. 3 pages, complete.", "Remediation items list concerning production incident RZ-3062, dated 26 May 2026. 2 pages, complete. It is signed by the reliability engineering lead.", "Postmortem meeting minutes concerning production incident RZ-3062, dated 13 June 2026. 3 pages, complete. It is signed by the chair of the postmortem meeting.", "Service level objective breach record concerning production incident RZ-3062, dated 13 June 2026. 1 page.", "Customer impact statement concerning production incident RZ-3062, dated 22 June 2022026. 2 pages, complete.", "Root cause analysis report concerning production incident RZ-3062, dated 9 June 2026. 5 pages, complete. It is signed by the reliability engineering lead.", "Alerting rules review note concerning production incident RZ-3062, dated 26 May 2026. 2 pages, complete.", "Alerting rules review note concerning production incident RZ-3062, dated 12 January 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 840}} {"id": "isc-te-00256-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Mersfell BV", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "29 May 2026"}, "checklist": ["Include the original complaint record, issued within the last 6 months.", "Include the goodwill gesture approval note, issued within the last 1 months and signed.", "Include the proposed resolution letter draft, signed.", "Include the customer contact log, issued within the last 3 months.", "Include the policy breach summary, issued within the last 3 months and signed.", "Include the complaint escalation form, issued within the last 1 months and signed."], "submission": {"case": {"name": "escalated complaint SD-98346", "reference": "GZ-99079"}, "documents received": ["SD-98346_goodwill_gesture_approval_note.pdf - Goodwill gesture approval note for escalated complaint SD-98346. Date of issue: 14 May 2026. Single page, signed by the Customer Relations Manager.", "SD-98346_staff_shift_rota_service_desk.pdf - Staff shift rota for the service desk, linked to escalated complaint SD-98346. Date of issue: 11 May 2026. 3 pages, complete.", "SD-98346_original_complaint_record.pdf - Original complaint record for escalated complaint SD-98346. Date of issue: 24 April 2026. 2 pages, complete.", "SD-98346_complaint_escalation_form.pdf - Complaint escalation form for escalated complaint SD-98346. Date of issue: 26 May 2026. 2 pages, complete, signed by the Customer Relations Manager.", "SD-98346_proposed_resolution_letter_draft.pdf - Proposed resolution letter draft for escalated complaint SD-98346. Date of issue: 22 May 2026. 2 pages, complete, signed by the Customer Relations Manager.", "SD-98346_policy_breach_summary.pdf - Policy breach summary for escalated complaint SD-98346. Date of issue: 1 May 2026. 2 pages, complete, signed by the Compliance Officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 880}} {"id": "isc-te-00193-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Wilmfield SAS", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "30 March 2026"}, "checklist": ["Photo identification, valid (not expired) on the date of the review", "Lost card declaration, signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "Fraud questionnaire, signed", "Card replacement request form, signed", "Confirmation of contact details, issued within the last 3 months"], "submission": {"case": {"name": "Omar Tadock", "reference": "OH-47944", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["fraud_questionnaire_tadock_oh47944.pdf - Fraud questionnaire for Omar Tadock. It shows a date of issue of 10 January 2026. 2 pages, complete. It is signed by Omar Tadock.", "overseas_address_form_tadock_oh47944.pdf - Temporary overseas address registration form for Omar Tadock. It shows a date of issue of 22 February 2026. 1 page, signed by Omar Tadock.", "contact_details_confirmation_tadock_oh47944.pdf - Confirmation of contact details for Omar Tadock. It shows a date of issue of 11 January 2026. 1 page.", "delivery_address_confirmation_tadock_oh47944.pdf - Delivery address confirmation for Omar Tadock. It shows a date of issue of 5 January 2026. 1 page, signed by Omar Tadock.", "card_replacement_request_tadock_oh47944.pdf - Card replacement request form for Omar Tadock. It shows a date of issue of 19 February 2026. 2 pages, complete. It is signed by Omar Tadock.", "lost_card_declaration_tadock_oh47944.pdf - Lost card declaration for Omar Tadock. It shows a date of issue of 19 January 2026. 1 page, with the signature line empty and not signed.", "photo_id_tadock_oh47944.pdf - Photo identification for Omar Tadock. It shows an expiry date of 4 May 2027. 1 page."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete when checked against the checklist. Consider every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete: every applicable line is met (extra documents do not matter). Return incomplete: at least one applicable line is not met. Return unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-18", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 921}} {"id": "isc-te-00130-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Halvness LLP", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "22 April 2026"}, "checklist": ["Trade references letter, issued within the last 3 months, signed", "Company registration certificate", "Bank reference letter, issued within the last 6 months, signed", "Personal guarantee, signed"], "submission": {"case": {"name": "Pravmark GmbH", "reference": "EM-15224"}, "documents received": ["Credit reference agency report for Pravmark GmbH, dated 10 April 2026. 6 pages, complete.", "Bank reference letter for Pravmark GmbH, dated 24 December 2025. 1 page. Signed by the bank's relationship manager.", "Trade references letter for Pravmark GmbH, dated 15 February 2026. 1 page. Signed by the referee's accounts manager.", "Personal guarantee for Pravmark GmbH, dated 19 February 2026. 2 pages, complete. Signed by the guarantor.", "Company registration certificate for Pravmark GmbH, dated 5 January 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Decide if the pack meets the checklist. Review each checklist line that applies to this case one by one. A required document only counts when it is the kind of document listed (not a similar one), is about the subject of the case, includes all its pages, is signed where the checklist asks for a signature, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-34", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 639}} {"id": "isc-te-00121-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Jundmoor Partners", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "4 August 2026"}, "checklist": ["Drying contractor's certificate of completion, issued within the last 6 months and signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Buildings insurance policy schedule", "Council flood warning notice, issued within the last 12 months", "Flood claim form, signed"], "submission": {"case": {"name": "property KX-91092", "reference": "OX-34504"}, "documents received": ["d7_loss_adjusters_inspection_report_KX91092.pdf — Loss adjuster's inspection report for property KX-91092, dated 8 May 2026. 6 pages, complete. Signed by the loss adjuster.", "d1_drying_contractors_certificate_of_completion_KX91092.pdf — Drying contractor's certificate of completion for property KX-91092, dated 17 May 2026. 2 pages, complete. Signed by the drying contractor.", "d5_flood_claim_form_KX91092.pdf — Flood claim form for property KX-91092, dated 9 April 2026. 5 pages, complete. Signed by the claimant.", "d3_buildings_insurance_policy_schedule_KX91092.pdf — Buildings insurance policy schedule for property KX-91092, dated 13 May 2026. 5 pages, complete.", "d2_photographs_of_flood_water_in_the_rooms_KX91092.pdf — Photographs of flood water in the rooms at property KX-91092, dated 19 July 2026. 3 pages, complete.", "d9_council_flood_warning_notice_BJ31265.pdf — Council flood warning notice for property BJ-31265, dated 1 March 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "You must judge if the pack is complete relative to the checklist. Review each line of the checklist that has relevance to this case. To count, a required document must match the kind of document the checklist specifies (a similar one will not do), must relate to the subject of the case, must include all its pages, must be signed wherever the checklist calls for a signature, must still be valid on the review date (that is, not expired), and must have been issued during the period the checklist permits. A conditional line binds the case only if the circumstance it describes actually holds. complete: all applicable lines are satisfied, and extra documents are of no consequence. incomplete: at least one applicable line fails. unclear: no line fails outright, but at least one cannot be decided on the basis of what is displayed, for example a necessary date, signature or page count is not visible, the kind of a document cannot be told, or the case details are silent on whether a conditional line's circumstance holds while that line's document is missing. Do not rely on cover notes or labels, which may mislead; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-52", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 879}} {"id": "isc-te-00109-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Veymere SAS", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "14 April 2026"}, "checklist": ["If the seller intends to list food or cosmetic products, also provide: safety compliance certificate (issued within the last 12 months)", "proof of trading address (issued within the last 3 months)", "product catalogue declaration (signed)", "authorised representative ID copy (valid (not expired) on the date of the review)", "business registration certificate", "returns policy statement (signed)"], "submission": {"case": {"name": "Ulmmore Ltd", "reference": "UN-41460"}, "documents received": ["Returns policy statement - Ulmmore Ltd.pdf. A returns policy statement for Ulmmore Ltd, dated 27 February 2026. 2 pages, complete. Signed by the operations manager.", "Authorised representative ID copy - Ulmmore Ltd.pdf. An authorised representative ID copy for Ulmmore Ltd showing an expiry date of 12 July 2027. Single page.", "Bank account verification letter - Ulmmore Ltd.pdf. A bank account verification letter for Ulmmore Ltd, dated 14 March 2026. Single page. Signed by the bank's account manager.", "Proof of trading address - Ulmmore Ltd.pdf. A proof of trading address for Ulmmore Ltd, dated 16 February 2026. Single page.", "Business registration certificate - Ulmmore Ltd.pdf. A business registration certificate for Ulmmore Ltd, dated 1 March 2026. Single page.", "Product catalogue declaration - Ulmmore Ltd.pdf. A product catalogue declaration for Ulmmore Ltd, dated 19 March 2026. 4 pages, complete. Signed by the managing director."]}}, "question": {"type": "choice", "instructions": "Judge whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-12", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 774}} {"id": "isc-te-00270-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Brenbrook plc", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "12 March 2026"}, "checklist": ["Risk assessment, issued within the last 3 months and signed", "If the change is planned during the year-end close period, also: freeze period exception approval, signed", "Proposed rule change specification, signed", "Current rule set export, issued within the last 1 months", "Post-change test plan, signed"], "submission": {"case": {"name": "firewall change KF-54774", "reference": "PF-69842", "details": ["The change is planned during the year-end close period."]}, "documents received": ["Freeze period exception approval, firewall change KF-54774. Date of issue: 15 November 2025. Single page. Signed by the IT operations manager.", "Post-change test plan, firewall change KF-54774. Date of issue: 6 March 2026. 2 pages, complete. Signed by the test analyst.", "Current rule set export, firewall change KF-54774. Date of issue: 26 February 2026. 8 pages, complete.", "Proposed rule change specification, firewall change KF-54774. Date of issue: 3 December 2025. 2 pages, complete. Signed by the firewall engineer.", "Business justification memo, firewall change KF-54774. Date of issue: 13 January 2026. Single page. Signed by the requesting business unit manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-65", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 739}} {"id": "isc-te-00011-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ebrhurst BV", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "16 March 2026"}, "checklist": ["Credit bureau report issued within the last 1 months", "Bank statement issued within the last 3 months", "Signed sale and purchase agreement", "Employment certificate issued within the last 1 months and signed", "Property valuation report issued within the last 6 months and signed", "Photo identity document valid (not expired) on the date of the review"], "submission": {"case": {"name": "property JV-52110", "reference": "YG-70426"}, "documents received": ["employment_certificate_JV-52110.pdf — Employment certificate for property JV-52110, dated 11 March 2026. Single page. Signed by the employer.", "student_card_with_photo_JV-52110.pdf — Student card with a photo for property JV-52110, expiring 19 March 2028. Single page.", "proof_of_deposit_JV-52110.pdf — Proof of deposit for property JV-52110, dated 5 February 2026. Single page.", "credit_bureau_report_JV-52110.pdf — Credit bureau report for property JV-52110, dated 3 March 2026. 4 pages, complete.", "sale_and_purchase_agreement_JV-52110.pdf — Sale and purchase agreement for property JV-52110, dated 26 November 2025. Signed by the buyer and the seller. 9 pages, complete.", "bank_statement_JV-52110.pdf — Bank statement for property JV-52110, dated 17 February 2026. 3 pages, complete.", "property_valuation_report_JV-52110.pdf — Property valuation report for property JV-52110, dated 6 November 2025. Signed by the valuer. 10 pages, complete."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case, one by one. A required document counts only if: it is the kind of document listed (not a similar one); it is about the subject of the case; it has all its pages; it is signed where the checklist asks for a signature; it has not expired on the date of the review; and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-2", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 855}} {"id": "isc-te-00347-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Vaskcliff SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "16 April 2026"}, "checklist": ["Check that the customer contact details sheet is present and signed.", "Check that the terms and conditions acceptance sheet is present and signed.", "Check that the identity verification document is present and valid, meaning not expired, on the date of the review.", "Check that the initial points balance statement is present and was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also check the points transfer evidence statement, which must have been issued within the last 3 months and be signed.", "Check that the marketing consent form is present and signed.", "Check that the nominated store preference form is present and signed."], "submission": {"case": {"name": "Eoin Natwick", "reference": "KR-35713", "details": ["The customer is not transferring points from any other scheme."]}, "documents received": ["initial_points_balance_statement_natwick.pdf. Initial points balance statement for Eoin Natwick, dated 6 April 2026. It is a single page.", "identity_verification_document_natwick_03.pdf. Identity verification document for Eoin Natwick, showing an expiry date of 14 April 2026. It is a single page.", "loyalty_scheme_enrolment_form_natwick.pdf. Loyalty scheme enrolment form for Eoin Natwick, dated 18 March 2026. A single page, signed by the customer.", "terms_and_conditions_acceptance_sheet_natwick.pdf. Terms and conditions acceptance sheet for Eoin Natwick, dated 22 February 2026. A single page, signed by the customer.", "marketing_consent_form_natwick.pdf. Marketing consent form for Eoin Natwick, dated 22 January 2026. A single page, signed by the customer.", "nominated_store_preference_form_natwick.pdf. Nominated store preference form for Eoin Natwick, dated 25 February 2026. A single page, signed by the customer.", "customer_contact_details_sheet_natwick.pdf. Customer contact details sheet for Eoin Natwick, dated 1 January 2026. A single page, signed by the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "expired", "defect": "expired before the review", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 881}} {"id": "isc-te-00157-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Morvholm SAS", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "6 March 2026"}, "checklist": ["Financial assessment form, signed.", "If the adult owns property that could be considered in the financial assessment, also: property valuation report, issued within the last 12 months and signed.", "Benefit entitlement letters, issued within the last 12 months.", "Capacity assessment record, signed.", "Proof of identity, valid (not expired) on the date of the review.", "Support plan, signed."], "submission": {"case": {"name": "Dimitris Yellani", "reference": "RL-43050", "details": ["The adult owns property that could be considered in the financial assessment."]}, "documents received": ["Proof of identity - Dimitris Yellani.pdf. Single-page proof of identity for Dimitris Yellani. The date of issue is smudged and cannot be read.", "Benefit entitlement letters - Dimitris Yellani.pdf. Benefit entitlement letters for Dimitris Yellani, dated 2 August 2025. 2 pages, complete.", "Capacity assessment record - Dimitris Yellani.pdf. Capacity assessment record for Dimitris Yellani, dated 23 November 2025. 4 pages, complete. Signed by the assessor.", "Financial assessment form - Dimitris Yellani.pdf. Financial assessment form for Dimitris Yellani, dated 31 January 2026. 6 pages, complete. Signed by the adult.", "Support plan - Dimitris Yellani.pdf. Support plan for Dimitris Yellani, dated 27 January 2026. 6 pages, complete. Signed by the support planner.", "Property valuation report - Dimitris Yellani.pdf. Property valuation report for Dimitris Yellani, dated 7 August 2025. 2 pages, complete. Signed by the valuer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 810}} {"id": "isc-te-00128-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskwick Group", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "3 April 2026"}, "checklist": ["Check that the pack contains a signed franchise agreement counterpart, signed.", "Check that the pack contains a franchise application form, signed.", "Check that the pack contains a funding agreement from a lender, signed and issued within the last 3 months.", "Check that the pack contains a training course completion certificate issued within the last 12 months.", "Check that the pack contains a fit-out cost estimate, signed and issued within the last 6 months.", "Check that the pack contains a pilot operation audit report, signed and issued within the last 6 months."], "submission": {"case": {"name": "Tondholm LLP", "reference": "WK-42460"}, "documents received": ["Funding agreement from a lender concerning Tondholm LLP, dated 11 February 2026. 6 pages, complete. Signed by the lender's authorised signatory.", "Signed franchise agreement counterpart concerning Tondholm LLP, dated 12 December 2025. 12 pages, complete. Signed by the franchisor's authorised signatory.", "Training course completion certificate concerning Tondholm LLP, dated 12 November 2025. Single page.", "Fit-out cost estimate concerning Tondholm LLP, dated 4 November 2025. 4 pages, complete. Signed by the fit-out contractor who prepared the estimate.", "Pilot operation audit report concerning Tondholm LLP, dated 13 October 2025. 8 pages, complete. Signed by the pilot operation auditor.", "Franchise application form concerning Tondholm LLP, dated 21 January 2026. 3 pages, complete. Signed by a partner of Tondholm LLP on behalf of the franchisee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 788}} {"id": "isc-te-00306-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Xanmore Ltd", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "1 September 2026"}, "checklist": ["Training course completion certificate, issued within the last 12 months.", "Signed franchise agreement counterpart.", "Funding agreement from a lender, issued within the last 3 months and signed.", "If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement, valid (not expired) on the date of the review and signed.", "Pilot operation audit report, issued within the last 6 months and signed.", "Fit-out cost estimate, issued within the last 6 months and signed."], "submission": {"case": {"name": "Norvham Limited", "reference": "IK-49788", "details": ["The franchise territory does not include premises in a shopping centre."]}, "documents received": ["Pilot operation audit report, issued 11 July 2026, concerning Norvham Limited. 8 pages, complete. Signed by the lead auditor.", "Franchise disclosure document receipt, issued 12 August 2026, concerning Norvham Limited. Single page. Signed by a director of Norvham Limited.", "Bank letter confirming an appointment with an advisor, issued 16 June 2026, concerning Norvham Limited. 6 pages, complete. Signed by the bank advisor.", "Fit-out cost estimate, issued 12 April 2026, concerning Norvham Limited. 4 pages, complete. Signed by the fit-out contractor's estimator.", "Signed franchise agreement counterpart, issued 1 July 2026, concerning Norvham Limited. 12 pages, complete. Signed by a director of Norvham Limited and by the franchisor's authorised signatory.", "Training course completion certificate, issued 9 July 2026, concerning Norvham Limited. Single page."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; base your judgement on the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-42", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00150-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jarlmouth LLP", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "17 June 2026"}, "checklist": ["If the supplier is a foreign company, also: certified translation of the certificate of incorporation (signed)", "Certificate of incorporation", "Supplier declaration of no conflicts of interest (signed)", "Bank details confirmation letter (issued within the last 3 months, signed)", "Supplier registration form (signed)"], "submission": {"case": {"name": "Xanhall Inc", "reference": "EC-70750", "details": ["The supplier is a domestic company."]}, "documents received": ["Certificate of insurance for Xanhall Inc, showing an expiry date of 31 October 2027. 2 pages, complete.", "Supplier registration form for Xanhall Inc, dated 12 May 2026. 3 pages, complete, signed by an authorised company representative.", "Certificate of incorporation for Xanhall Inc, issued 19 February 2026. 2 pages, complete.", "Supplier declaration of no conflicts of interest for Xanhall Inc, dated 18 May 2026. Single page, signed by a company director.", "Bank details confirmation letter for Xanhall Inc, issued 5 May 2026. Single page, signed by a bank officer."]}}, "question": {"type": "choice", "instructions": "Determine whether the checklist is fully satisfied by the pack. Go over every checklist line that applies to this case. A required document counts only when it is the kind of document the checklist lists (not merely a similar one), when it is about the case's subject, when it has all its pages, when it is signed wherever the checklist asks for a signature, when it has not expired as of the review date, and when it was issued within the period the checklist allows. Only if its circumstance holds for the case does a conditional line apply. complete: each applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example because a needed date, signature or page count is not visible, because a document's kind cannot be told, or because the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may mislead; the documents themselves are what you must judge.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-53", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 703}} {"id": "isc-te-00074-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Jordale plc", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "12 March 2026"}, "checklist": ["If the equipment is above the major purchase threshold, also include: tender waiver justification (signed)", "Equipment purchase request form (signed)", "Installation requirements note", "Cost-benefit justification", "Training needs assessment (signed)", "Grant fund eligibility note (signed, issued within the last 6 months)"], "submission": {"case": {"name": "equipment EZ-12088", "reference": "RL-72447"}, "documents received": ["Cost-benefit justification for equipment EZ-12088, dated 23 December 2025. 3 pages, complete.", "Grant fund eligibility note for equipment EZ-12088, dated 9 February 2026. 1 page. Signed by the Research Funding Officer.", "Three quotes comparison sheet for equipment EZ-12088, dated 24 February 2026. 1 page. Signed by the Procurement Lead.", "Installation requirements note for equipment EZ-12088, dated 8 February 2026. 2 pages, complete.", "Training needs assessment for equipment EZ-12088, dated 13 November 2025. 1 page. Signed by the Training Manager.", "Tender waiver justification for equipment EZ-12088, dated 3 March 2026. 1 page. Signed by the Director of Procurement.", "Equipment purchase request form for equipment EZ-12088, dated 12 November 2025. 2 pages, complete. Signed by the requesting Department Head."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00029-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Ebrmoor BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "17 July 2026"}, "checklist": ["Investigator appointment letter, issued within the last 3 months", "Grievance procedure acknowledgement, issued within the last 3 months and signed", "Evidence bundle index, signed", "Meeting invitation with rights explained, issued within the last 1 months", "Previous grievance outcome letter, issued within the last 24 months", "Written grievance statement, signed", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed"], "submission": {"case": {"name": "Daan Ustett", "reference": "GC-91390"}, "documents received": ["Written grievance statement. Statement about Daan Ustett dated 4 April 2026. 3 pages, complete, signed by Daan Ustett.", "Investigator appointment letter. Letter about Daan Ustett dated 17 May 2026. Single page.", "Grievance procedure acknowledgement. Acknowledgement about Daan Ustett dated 15 May 2026. Single page, signed by Daan Ustett.", "Previous grievance outcome letter. Letter about Daan Ustett dated 19 December 2024. 2 pages, complete.", "Witness list. List about Daan Ustett dated 4 June 2026. Single page, signed by the case investigator.", "Evidence bundle index. Index about Daan Ustett dated 23 March 2026. 2 pages, complete, signed by the case investigator.", "Meeting invitation with rights explained. Invitation about Daan Ustett dated 3 July 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 785}} {"id": "isc-te-00063-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ivrby Partners", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "15 July 2026"}, "checklist": ["Certificate of insurance, valid (not expired) on the date of the review.", "Supplier registration form, signed.", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed.", "Bank details confirmation letter, issued within the last 3 months, signed.", "Anti-bribery policy statement, signed.", "Company tax clearance certificate, valid (not expired) on the date of the review.", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid (not expired) on the date of the review."], "submission": {"case": {"name": "Corvcrest Ltd", "reference": "QW-68059", "details": ["The supplier is a domestic company.", "The supplier is a small business with a single owner."]}, "documents received": ["Copy of the owner's photo identification for Corvcrest Ltd. It shows an expiry date of 9 February 2028 and is a single page.", "Company tax clearance certificate for Corvcrest Ltd. It shows an expiry date of 29 December 2026 and is a single page.", "Anti-bribery policy statement for Corvcrest Ltd. It is dated 22 June 2026 and is signed by an authorised representative of the supplier. 2 pages, complete.", "Certificate of insurance for Corvcrest Ltd. It shows an expiry date of 18 July 2028. Pages 1-1 of 2 are included.", "Supplier registration form for Corvcrest Ltd. It is dated 24 April 2026 and is signed by an authorised representative of the supplier. 3 pages, complete.", "Bank details confirmation letter for Corvcrest Ltd. It is dated 20 June 2026, is a single page, and is signed by the supplier's finance manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 824}} {"id": "isc-te-00358-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Kestlock Ltd", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "4 August 2026"}, "checklist": ["Check that the expense claim form is signed.", "Check that the train ticket receipt is present.", "Check that the currency conversion statement was issued within the last 6 months.", "If the claim includes mileage for use of a private car, also check that the mileage log is signed.", "Check that the boarding pass stub is present.", "Check that the taxi fare receipt was issued within the last 6 months."], "submission": {"case": {"name": "Emre Tibins", "reference": "QF-77856", "details": ["The claim includes no private car mileage."]}, "cover note": "Please review this pack for reference QF-77856. Everything needed is attached and complete. David Ustisey", "documents received": ["conference_fee_invoice_QF-77856.pdf — Conference fee invoice about Emre Tibins, dated 19 March 2026. It is a single page.", "currency_conversion_statement_QF-77856.pdf — Currency conversion statement about Emre Tibins, dated 30 June 2026. It is a single page.", "taxi_fare_receipt_QF-77856.pdf — Taxi fare receipt about Emre Tibins, dated 8 July 2026. It is a single page.", "train_ticket_receipt_QF-77856.pdf — Train ticket receipt about Emre Tibins, dated 28 July 2026. It is a single page.", "expense_claim_form_partial_QF-77856.pdf — Expense claim form about Emre Tibins, dated 4 June 2026. Pages 1 to 1 are included, and the total number of pages is not shown anywhere. Signed by the claiming employee.", "restaurant_receipt_QF-77856.pdf — Restaurant receipt about Emre Tibins, dated 25 June 2026. It is a single page.", "boarding_pass_stub_QF-77856.pdf — Boarding pass stub about Emre Tibins, dated 7 April 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 883}} {"id": "isc-te-00172-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Ebrwick plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "13 August 2026"}, "checklist": ["Alerting rules review note, issued within the last 3 months", "Root cause analysis report, issued within the last 3 months and signed", "Incident timeline, issued within the last 3 months", "Service level objective breach record, issued within the last 3 months", "Remediation items list, issued within the last 3 months and signed", "Customer impact statement, issued within the last 3 months"], "submission": {"case": {"name": "production incident RZ-3062", "reference": "KV-98742"}, "documents received": ["Incident timeline concerning production incident RZ-3062, dated 2 June 2026. 3 pages, complete.", "Alerting rules review note concerning production incident RZ-3062, dated 21 March 2026. 2 pages, complete.", "Customer impact statement concerning production incident RZ-3062, dated 22 June 2022026. 2 pages, complete.", "Root cause analysis report concerning production incident RZ-3062, dated 9 June 2026. 5 pages, complete. It is signed by the reliability engineering lead.", "Service level objective breach record concerning production incident RZ-3062, dated 13 June 2026. 1 page.", "Remediation items list concerning production incident RZ-3062, dated 26 May 2026. 2 pages, complete. It is signed by the reliability engineering lead.", "Alerting rules review note concerning production incident RZ-3062, dated 22 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Does the pack measure up to the checklist? Examine every checklist line that applies here. A required document only counts if it is the kind of document listed (not a similar one), relates to the subject of the case, contains all its pages, carries a signature wherever the checklist asks for one, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Use complete if every applicable line is met (extra documents do not matter). Use incomplete if at least one applicable line is not met. Use unclear if no line is clearly unmet but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-23", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 794}} {"id": "isc-te-00195-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Pellside LLP", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "3 March 2026"}, "checklist": ["Authorised representative ID copy, valid (not expired) on the date of the review", "Tax registration letter", "Anti-money laundering questionnaire, signed", "Proof of trading address, issued within the last 3 months", "If the seller intends to list food or cosmetic products, also: safety compliance certificate, issued within the last 12 months", "Business registration certificate", "Product catalogue declaration, signed", "If the seller is a sole trader rather than a company, also: sole trader statutory declaration, signed"], "submission": {"case": {"name": "Quelmouth Inc", "reference": "JT-56871", "details": ["The seller intends to list food or cosmetic products.", "The seller is a sole trader rather than a company."]}, "documents received": ["sole_trader_statutory_declaration.pdf — Sole trader statutory declaration for Quelmouth Inc. The date of issue is 11 November 2025. 1 page. It is signed by the seller.", "proof_of_trading_address.pdf — Proof of trading address for Quelmouth Inc. The date of issue is 7 February 2026. 1 page.", "anti_money_laundering_questionnaire.pdf — Anti-money laundering questionnaire for Quelmouth Inc. The date of issue is 18 January 2026. 3 pages, complete. It is signed by the authorised representative.", "product_catalogue_declaration.pdf — Product catalogue declaration for Quelmouth Inc. The date of issue is 16 February 2026. 4 pages, complete. It is signed by the authorised representative.", "authorised_representative_ID_copy.pdf — Authorised representative ID copy for Quelmouth Inc. The expiry date shown is 6 March 2027. 1 page.", "tax_registration_letter.pdf — Tax registration letter for Quelmouth Inc. The date of issue is 7 January 2026. 1 page.", "safety_compliance_certificate.pdf — Safety compliance certificate for Quelmouth Inc. The date of issue is 17 September 2025. 2 pages, complete.", "business_registration_certificate.pdf — Business registration certificate for Quelmouth Inc. The date of issue is 9 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 900}} {"id": "isc-te-00113-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Xanwald SAS", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "24 June 2026"}, "checklist": ["System pressure test results, issued within the last 1 months, signed", "If the system contains more than 5 tonnes of refrigerant, also: fixed leak detection test certificate, issued within the last 6 months, signed", "Plant room access sign-in sheet", "Engineer F-gas handling certificate, valid (not expired) on the date of the review", "Thermostat calibration certificate, issued within the last 12 months", "Asset condition photograph sheet, issued within the last 1 months"], "submission": {"case": {"name": "air conditioning system PS-44263", "reference": "MV-14815", "details": ["The system contains more than 5 tonnes of refrigerant."]}, "documents received": ["PS-44263_system_pressure_test_results_070626.pdf. System pressure test results for air conditioning system PS-44263, dated 7 June 2026. 2 pages, complete. Signed by the commissioning engineer.", "PS-44263_plant_room_access_sign_in_sheet_120526.pdf. Plant room access sign-in sheet for air conditioning system PS-44263, dated 12 May 2026. 1 page.", "PS-44263_fixed_leak_detection_test_certificate_010226.pdf. Fixed leak detection test certificate for air conditioning system PS-44263, dated 1 February 2026. 2 pages, complete. Signed by the leak detection engineer.", "PS-44263_engineer_F_gas_handling_certificate_20102028.pdf. Engineer F-gas handling certificate for air conditioning system PS-44263, showing an expiry date of 20 October 2028. 1 page.", "PS-44263_refrigerant_top_up_log_140626.pdf. Refrigerant top-up log for air conditioning system PS-44263, dated 14 June 2026. 1 page. Signed by the attending refrigeration engineer.", "PS-44263_thermostat_calibration_certificate_160725.pdf. Thermostat calibration certificate for air conditioning system PS-44263, dated 16 July 2025. 1 page.", "PS-44263_asset_condition_photograph_sheet_030626.pdf. Asset condition photograph sheet for air conditioning system PS-44263, dated 3 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 995}} {"id": "isc-te-00377-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Vornburg & Co", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "24 April 2026"}, "checklist": ["If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "venue access instructions (issued within the last 3 months)", "If the delegate requires an adjusted learning plan, also: learning support agreement (signed)", "payment confirmation (issued within the last 3 months)", "delegate photo identification (valid (not expired) on the date of the review)", "special requirements note", "cancellation policy acceptance (signed)"], "submission": {"case": {"name": "course booking UL-99308", "reference": "DD-21847", "details": ["The course leads to a licensed qualification.", "The delegate requires no adjusted learning plan."]}, "documents received": ["Payment confirmation for course booking UL-99308, issued on 20 April 2026. Single page.", "File scan_20260424_014.pdf. The file will not open, so its contents cannot be seen.", "Venue access instructions for course booking UL-99308, issued on 5 February 2026. Single page.", "Licence eligibility declaration for course booking UL-99308, issued on 4 April 2026. Single page. Signed by the delegate.", "Special requirements note for course booking UL-99308, issued on 21 January 2026. Single page.", "Delegate photo identification for course booking UL-99308. It shows an expiry date of 19 December 2027. Single page.", "Cancellation policy acceptance for course booking UL-99308, issued on 25 February 2026. Single page. Signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Work out whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-74", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 795}} {"id": "isc-te-00243-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ambmont Limited", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "9 June 2026"}, "checklist": ["Check that the pack contains the invoice discrepancy log.", "Check that the pack contains the supplier response letter, issued within the last 3 months and signed.", "Check that the pack contains the quality inspection report, issued within the last 6 months and signed.", "Check that the pack contains the delivery record summary, issued within the last 12 months.", "Check that the pack contains the service level summary, issued within the last 12 months."], "submission": {"case": {"name": "Ilvwood Limited", "reference": "AY-23034"}, "documents received": ["Supplier response letter for Ilvwood Limited, dated 29 May 2026. Single page; the signature line is empty, so it is not signed.", "Service level summary for Ilvwood Limited, dated 25 June 2025. Single page.", "Delivery record summary for Ilvwood Limited, dated 5 March 2026. 2 pages, complete.", "Quality inspection report for Ilvwood Limited, dated 7 June 2026. 3 pages, complete. Signed by the quality inspector.", "Contract compliance checklist for Ilvwood Limited, dated 3 April 2026. 3 pages, complete. Signed by the contract manager.", "Supplier performance scorecard for Ilvwood Limited, dated 8 May 2026. 2 pages, complete. Signed by the supplier management team lead.", "Invoice discrepancy log for Ilvwood Limited, dated 24 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The task is to decide whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete if every applicable line is met (extra documents do not matter). Answer incomplete if at least one applicable line is not met. Answer unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-70", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 758}} {"id": "isc-te-00264-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vaskwyn SAS", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "3 July 2026"}, "checklist": ["If the mobile app release adds a new payment feature, also include: payment provider compliance checklist (issued within the last 3 months, signed)", "Release notes (issued within the last 1 months)", "Crash-free rate report (issued within the last 1 months)", "Marketing screenshot pack", "Age rating questionnaire (signed)", "Device compatibility matrix (issued within the last 3 months)"], "submission": {"case": {"name": "mobile app release GK-82707", "reference": "VU-56351", "details": ["The mobile app release adds a new payment feature."]}, "documents received": ["device_compatibility_matrix_GK-82707.pdf — Device compatibility matrix for mobile app release GK-82707. Date of issue: 30 April 2026. 2 pages, complete.", "age_rating_questionnaire_GK-82707.pdf — Age rating questionnaire for mobile app release GK-82707. Date of issue: 24 March 2026. 2 pages, complete. Signed by the product owner.", "crash_free_rate_report_GK-82707.pdf — Crash-free rate report for mobile app release GK-82707. Date of issue: 24 June 2026. Single page.", "marketing_screenshots_GK-82707.pdf — Marketing screenshot pack for mobile app release GK-82707. Date of issue: 24 May 2026. 6 pages, complete.", "release_notes_GK-82707.pdf — Release notes for mobile app release GK-82707. Date of issue: 1 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00318-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Trelvale plc", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "29 April 2026"}, "checklist": ["Supplier self-assessment report, issued within the last 12 months, signed", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months, signed", "Raw material certificate of analysis, issued within the last 6 months, signed", "Certified quality management system certificate, valid (not expired) on the date of the review", "Supplier quality questionnaire, issued within the last 12 months, signed", "Supplier audit report, issued within the last 24 months, signed"], "submission": {"case": {"name": "Raskmoor Partners", "reference": "UB-25706", "details": ["The supplier subcontracts part of the production."]}, "documents received": ["Scanned certified quality management system certificate for Raskmoor Partners, showing an expiry date of 23 January 2027. Single page.", "Scanned supplier quality questionnaire for Raskmoor Partners, dated 15 July 2025. 4 pages, complete. Signed by the supplier's quality manager.", "Scanned raw material certificate of analysis for Raskmoor Partners, dated 23 February 2026. 2 pages, complete. The signature line is empty, so the document is not signed.", "Scanned subcontractor approval record for Raskmoor Partners, dated 26 April 2026. 2 pages, complete. Signed by the supplier's operations manager.", "Scanned supplier audit report for Raskmoor Partners, dated 9 May 2025. 8 pages, complete. Signed by the lead auditor.", "Scanned supplier corrective action plan for Raskmoor Partners, dated 15 March 2026. 3 pages, complete. Signed by the supplier's quality manager.", "Scanned supplier self-assessment report for Raskmoor Partners, dated 24 October 2025. 6 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 849}} {"id": "isc-te-00060-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Glengard Group", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "3 April 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed", "Certificate of insurance, valid (not expired) on the date of the review", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid (not expired) on the date of the review", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed", "Supplier registration form, signed", "Anti-bribery policy statement, signed", "Certificate of incorporation", "Supplier declaration of no conflicts of interest, signed"], "submission": {"case": {"name": "Austwyn Limited", "reference": "LU-89623", "details": ["The supplier is a small business with a single owner.", "The supplier is a domestic company."]}, "documents received": ["Certificate of insurance for Austwyn Limited. Shows an expiry date of 5 July 2028, 2 pages, complete.", "Anti-bribery policy statement for Austwyn Limited. Dated 11 January 2026, 2 pages, complete, signed by the supplier's managing director.", "Bank details confirmation letter for Austwyn Limited. Dated 21 March 2026, 1 page, signed by the supplier's finance manager.", "Certificate of incorporation for Austwyn keep name consistent: Austwyn Limited. Dated 7 January 2026, 2 pages, complete.", "Supplier declaration of no conflicts of interest for Austwyn Limited. Dated 27 March 2026, 1 page, signed by the supplier's managing director.", "Copy of the owner's photo identification for Austwyn Limited. Shows an expiry date of 28 May 2027, 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00456-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Stromstow Partners", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "2 April 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed", "Employee bank detail confirmation, issued within the last 6 months and signed", "Travel advance request form, signed", "Travel policy extract showing advance eligibility", "If the trip involves travel to another country, also: foreign travel authorisation from a director, signed", "Outstanding advance clearance check, signed", "Line manager approval for the advance, signed"], "submission": {"case": {"name": "Sophie Moskini", "reference": "RK-62728", "details": ["The trip is wholly within the home country."]}, "cover note": "Everything needed is attached and complete. Please review and confirm the advance can be paid.", "documents received": ["Payroll_Deduction_Agreement_Advance_SM_15022026.pdf — Payroll deduction agreement for recovery of the advance for Sophie Moskini, dated 15 February 2026. Single page. Signed by Sophie Moskini and the payroll officer.", "Employee_Bank_Detail_Confirmation_SM_01112025.pdf — Employee bank detail confirmation for Sophie Moskini, dated 1 November 2025. Single page. Signed by Sophie Moskini.", "Costed_Trip_Estimate_Sheet_SM_14032026.pdf — Costed trip estimate sheet for Sophie Moskini, dated 14 March 2026. Single page. Signed by Sophie Moskini.", "Outstanding_Advance_Clearance_Check_SM_26122025.pdf — Outstanding advance clearance check for Sophie Moskini, dated 26 December 2025. Single page. Signed by an accounts payable reviewer.", "Travel_Policy_Extract_Advance_Eligibility_SM_27012026.pdf — Travel policy extract showing advance eligibility for Sophie Moskini, dated 27 January 2026. Single page.", "Line_Manager_Approval_Advance_SM_03032026.pdf — Line manager approval for the advance for Sophie Moskini, dated 3 March 2026. Single page. Signed by the line manager.", "Trip_Itinerary_and_Approval_SM_30032026.pdf — Trip itinerary and approval for Sophie Moskini, dated 30 March 2026. 2 pages, complete. Signed by the line manager.", "File_0003_SM.pdf — The file will not open, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 962}} {"id": "isc-te-00401-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Yondwell Limited", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "31 July 2026"}, "checklist": ["Inbound unloading record, issued within the last 1 months and signed.", "Transfer completion confirmation, issued within the last 1 months and signed.", "Seal number log, issued within the last 1 months and signed.", "Transfer manifest, signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet, issued within the last 1 months and signed.", "Outbound loading record, issued within the last 1 months and signed.", "Cross-dock slot booking sheet, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer MZ-75713", "reference": "QF-14367", "details": ["The transfer includes a temperature-controlled load."]}, "documents received": ["Seal number log for cross-dock transfer MZ-75713, dated 12 July 2026, 1 page. It is signed by the cross-dock supervisor.", "Inbound unloading record for cross-dock transfer MZ-75713, dated 10 July 2026, 1 page. It is signed by the inbound unloading team leader.", "Damaged goods exception sheet for cross-dock transfer MZ-75713, dated 26 July 2026, 1 page. It is signed by the goods-in clerk.", "Outbound loading record for cross-dock transfer MZ-75713, dated 25 July 2026, 1 page. It is signed by the outbound loading team leader.", "Picking list for a single customer order on cross-dock transfer MZ-75713, dated 22 May 2026, 3 pages, complete. It is signed by the warehouse picker.", "Transfer manifest for cross-dock transfer MZ-75713, dated 22 May 2026, 3 pages, complete. It is signed by the transport planner.", "Cross-dock chiller unit check sheet for cross-dock transfer MZ-75713, dated 28 July 2026, 1 page. It is signed by the refrigeration technician.", "Transfer completion confirmation for cross-dock transfer MZ-75713, dated 18 July 2026, 1 page. It is signed by the transport planner.", "Cross-dock slot booking sheet for cross-dock transfer MZ-75713, dated 11 July 2026, 1 page. It is signed by the slot booking coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 990}} {"id": "isc-te-00477-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Faldcourt BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "26 June 2026"}, "checklist": ["Previous grievance outcome letter issued within the last 24 months.", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed.", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed.", "Witness list, signed.", "Grievance procedure acknowledgement issued within the last 3 months, signed.", "Adjustment request record issued within the last 3 months, signed.", "Written grievance statement, signed."], "submission": {"case": {"name": "Chloe Clemby", "reference": "EW-81989", "details": ["The grievance is against the employee's direct manager.", "The grievance alleges bullying by a named colleague."]}, "cover note": "This pack has already been checked by a colleague before it reached you.", "documents received": ["Adjustment request record, Chloe Clemby, issued 13 March 2025, single page. Signed by the occupational health adviser.", "Witness list, Chloe Clemby, issued 21 April 2026, single page. Signed by the case handler.", "Written grievance statement, Chloe Clemby, issued 19 April 2026. 3 pages, complete. Signed by Chloe Clemby.", "Alternative manager reporting line note, Chloe Clemby, issued 5 June 2026, single page. Signed by the employee relations manager.", "Previous grievance outcome letter, Chloe Clemby, issued 8 July 2025. 2 pages, complete.", "Grievance procedure acknowledgement, Chloe Clemby, issued 16 May 2026, single page. Signed by Chloe Clemby.", "Bullying allegation evidence log, Chloe Clemby, issued 19 May 2026. 3 pages, complete. Signed by the employee relations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 819}} {"id": "isc-te-00174-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Gravwell Ltd", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "24 August 2026"}, "checklist": ["Marketing screenshot pack", "Device compatibility matrix, issued within the last 3 months", "Localisation completeness report, issued within the last 1 months", "Store listing description, issued within the last 1 months", "Privacy policy update, issued within the last 3 months", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months, signed", "Crash-free rate report, issued within the last 1 months"], "submission": {"case": {"name": "mobile app release TG-70212", "reference": "OE-37898", "details": ["The mobile app release includes third-party analytics."]}, "documents received": ["marketing_screenshot_pack_TG-70212.pdf - Marketing screenshot pack for mobile app release TG-70212. Date of issue: 8 July 2026. 6 pages, complete.", "localisation_completeness_report_TG-70212.pdf - Localisation completeness report for mobile app release TG-70212. Date of issue: 21 August 2026. 2 pages, complete.", "store_listing_description_TG-70212.pdf - Store listing description for mobile app release TG-70212. Date of issue: 5 August 2026. Single page.", "release_notes_TG-70212.pdf - Release notes for mobile app release TG-70212. Date of issue: 11 August 2026. 2 pages, complete.", "crash_free_rate_report_TG-70212.pdf - Crash-free rate report for mobile app release TG-70212. Date of issue: 22 August 2026. Single page.", "privacy_policy_update_TG-70212.pdf - Privacy policy update for mobile app release TG-70212. Date of issue: 15 July 2026. 2 pages, complete.", "age_rating_questionnaire_TG-70212.pdf - Age rating questionnaire for mobile app release TG-70212. Date of issue: 10 July 2026. 2 pages, complete, signed by the mobile release team lead.", "device_compatibility_matrix_TG-70212.pdf - Device compatibility matrix for mobile app release TG-70212. Date of issue: 21 August 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 974}} {"id": "isc-te-00473-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Uldberg Partners", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "21 May 2026"}, "checklist": ["Planned completion date sheet, signed.", "Access authorisation slip, signed.", "If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Parts order confirmation, issued within the last 1 months.", "Photographs of the fault, issued within the last 3 months.", "Job request form, signed."], "submission": {"case": {"name": "maintenance request NO-34425", "reference": "UR-51642", "details": ["The job involves working at height above two metres."]}, "cover note": "The pack for maintenance request NO-34425, reference UR-51642, has already been checked by a colleague in the helpdesk, and I am passing it on for the review on 21 May 2026.", "documents received": ["Access authorisation slip for maintenance request NO-34425. Dated 9 May 2026. 1 page. Signed by the site access coordinator.", "Permit to work at height for maintenance request NO-34425. Dated 1 May 2026. 1 page. Signed by the issuing supervisor.", "Planned completion date sheet for maintenance request NO-34425. Dated 21 February 2026. 1 page. Signed by the facilities manager.", "Job request form for maintenance request NO-34425. Dated 3 February 2026. 1 page. A sticky note covers the signature block, so it is not known whether the form is signed.", "Photographs of the fault for maintenance request NO-34425. Dated 24 March 2026. 2 pages, complete.", "Parts order confirmation for maintenance request NO-34425. Dated 5 May 2026. 1 page.", "Location details sheet for maintenance request NO-34425. Dated 29 March 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 872}} {"id": "isc-te-00397-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Ovarheim plc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "6 August 2026"}, "checklist": ["Energy performance certificate, valid (not expired) on the date of the review.", "Title information document.", "If the tenant is a newly formed company, also: signed parent company guarantee (signed).", "Keys handover receipt (signed).", "Asbestos survey report (issued within the last 12 months).", "Signed draft lease (signed).", "If the lease term is longer than seven years, also: land registration application (signed)."], "submission": {"case": {"name": "premises SZ-39951", "reference": "XS-67082", "details": ["Thetestant is an established company.", "The lease term is seven years or less."]}, "documents received": ["Title information document for premises SZ-39951. It shows a date of issue of 8 July 2026. 3 pages, complete.", "Signed draft lease for premises SZ-39951. It shows a date of issue of 30 May 2026 and is signed by the landlord and the tenant. 12 pages, complete.", "Asbestos survey report for premises SZ-39951. It shows a date of issue of 27 December 2025. 4 pages, complete.", "Energy performance certificate for premises SZ-39951. Its expiry date cannot be seen because it is covered by an ink stamp. Single page.", "Company search report for premises SZ-39951. It shows a date of issue of 3 August 2026. 2 pages, complete.", "Keys handover receipt for premises SZ-39951. It shows a date of issue of 5 July 2026 and is signed by the landlord's agent. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00127-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Selvgate Ltd", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "14 April 2026"}, "checklist": ["Funding agreement from a lender, issued within the last 3 months and signed", "Franchise disclosure document receipt, issued within the last 3 months and signed", "If the franchisee intends to operate through a company rather than as an individual, also: shareholder agreement extract, signed", "Operator licence, valid (not expired) on the date of the review", "Franchise application form, signed"], "submission": {"case": {"name": "Fennburg BV", "reference": "FA-82179", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "documents received": ["FA-82179_operator_licence_Fennburg_BV_1.pdf. An operator licence concerning Fennburg BV, 2 pages, complete. Its date of issue is obscured by a stamp across the corner.", "FA-82179_franchise_disclosure_document_receipt_Fennburg_BV.pdf. A franchise disclosure document receipt concerning Fennburg BV, dated 12 February 2026, one page. It is signed by the franchisor's authorised officer.", "FA-82179_franchise_application_form_Fennburg_BV.pdf. A franchise application form concerning Fennburg BV, dated 26 January 2026, 3 pages, complete. It is signed by the franchisee's director.", "FA-82179_shareholder_agreement_extract_Fennburg_BV.pdf. A shareholder agreement extract concerning Fennburg BV, dated 11 March 2026, 4 pages, complete. It is signed by the company's shareholders.", "FA-82179_funding_agreement_Fennburg_BV.pdf. A funding agreement from a lender concerning Fennburg BV, dated 23 February 2026, 6 pages, complete. It is signed by the lender."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00081-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Varnheim LLP", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "12 March 2026"}, "checklist": ["Incident timeline, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Service level objective breach record, issued within the last 3 months.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months and signed.", "Follow-up owner assignment sheet, issued within the last 3 months and signed."], "submission": {"case": {"name": "production incident QS-14969", "reference": "CV-96947", "details": ["The incident was caused by a third-party service outage."]}, "documents received": ["Follow-up owner assignment sheet concerning production incident QS-14969. It shows its date of issue as 24 December 2025. Signed by the reliability engineering team lead. 1 page.", "Customer impact statement concerning production incident QS-14969. It shows its date of issue as 12 January 2026. 2 pages, complete.", "Service level objective breach record concerning production incident QS-14969. It shows its date of issue as 8 January 2026. 1 page.", "The on-call duty roster for the month of the incident concerning production incident QS-14969. It shows its date of issue as 8 February 2026. 3 pages, complete.", "Vendor outage acknowledgement letter concerning production incident QS-14969. It shows its date of issue as 6 March 2026. Signed by the vendor's service manager. 1 page.", "Postmortem meeting minutes concerning production incident QS-14969. They show their date of issue as 11 February 2026. Signed by the meeting chair. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete against the checklist. Work through every checklist line that applies to this case. Only a document that is the kind listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows counts as satisfying a required document. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-48", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00395-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Creskwater Ltd", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "16 September 2026"}, "checklist": ["Default notice previously served, issued within the last 6 months, signed.", "If the defaulting party is a public sector body, also: public sector termination approvals record, issued within the last 3 months, signed.", "Losses calculation statement, issued within the last 1 months, signed.", "Termination clause legal opinion, issued within the last 1 months, signed.", "Termination notice draft, signed.", "Original service agreement copy.", "Cure period expiry calculation, issued within the last 1 months, signed."], "submission": {"case": {"name": "Kaldbury GmbH", "reference": "XV-18490", "details": ["The defaulting party is a private company."]}, "cover note": "Please find attached the full pack for XV-18490. Everything needed is attached and complete, so the review can go ahead as planned on 16 September 2026.", "documents received": ["Cure period expiry calculation - Kaldbury GmbH.pdf. This is the cure period expiry calculation about Kaldbury GmbH, dated 14 September 2026. It is 2 pages, complete, and signed by the contract manager.", "Termination clause legal opinion - Kaldbury GmbH.pdf. This is the termination clause legal opinion about Kaldbury GmbH, dated 8 September 2026. It is 5 pages, complete, and signed by external counsel.", "Breach evidence log - Kaldbury GmbH.pdf. This is the breach evidence log about Kaldbury GmbH, dated 30 August 2026. It is 6 pages, complete, and signed by the dispute resolution lead.", "Losses calculation statement - Kaldbury GmbH.pdf. This is the losses calculation statement about Kaldbury GmbH, dated 26 August 2026. It is 3 pages, complete, and signed by the finance director.", "Termination notice draft - Kaldbury GmbH.pdf. This is the termination notice draft about Kaldbury GmbH, dated 13 July 2026. It is 2 pages, complete, and signed by the head of legal.", "Original service agreement copy - Kaldbury GmbH.pdf. This is the original service agreement copy about Kaldbury GmbH, dated 9 June 2026. It is 10 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 918}} {"id": "isc-te-00077-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Elstham SAS", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "17 July 2026"}, "checklist": ["Payment gateway technical specification for the gateway, on file.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review.", "Test environment transaction log, issued within the last 1 months.", "Data protection impact assessment, issued within the last 12 months, signed.", "Gateway integration request form, signed."], "submission": {"case": {"name": "payment gateway FY-30649", "reference": "NK-85955", "details": ["The gateway will not store customers' card details."]}, "cover note": "Please accept my apologies for the rushed way this pack was put together.", "documents received": ["Data protection impact assessment for payment gateway FY-30649, dated 12 October 2025, signed by the Data Protection Officer. 5 pages, complete.", "Test environment transaction log for payment gateway FY-30649, dated 26 June 2026. 4 pages, complete.", "Payment gateway technical specification for payment gateway FY-30649, dated 28 March 2026. 8 pages, complete.", "Gateway integration request form for payment gateway FY-30649, dated 9 April 2026, signed by the requesting manager. 2 pages, complete.", "Test environment transaction log for payment gateway FY-30649, dated 6 December 2024. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 749}} {"id": "isc-te-00346-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Garnford Limited", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "15 September 2026"}, "checklist": ["If the complaint alleges a member of staff behaved rudely, also: staff member written response (signed)", "policy breach summary (issued within the last 3 months, signed)", "proposed resolution letter draft (signed)", "store incident report (issued within the last 3 months, signed)", "complaint escalation form (issued within the last 1 months, signed)", "If the complaint involves a data protection concern, also: data protection impact note (issued within the last 1 months, signed)", "complaint category code sheet"], "submission": {"case": {"name": "escalated complaint HJ-70397", "reference": "FT-75575", "details": ["The complaint makes no allegation about staff behaviour.", "The complaint involves a data protection concern."]}, "documents received": ["data_protection_impact_note_HJ-70397.pdf - A data protection impact note relating to escalated complaint HJ-70397. Date of issue: 28 August 2026. 2 pages, complete. Signed by the Data Protection Officer.", "policy_breach_summary_HJ-70397.pdf - A policy breach summary relating to escalated complaint HJ-70397. Date of issue: 14 July 2026. 2 pages, complete. Signed by the Store Manager.", "complaint_escalation_form_HJ-70397.pdf - A complaint escalation form relating to escalated complaint HJ-70397. Date of issue: 1 September 2026. 2 pages, complete. Signed by the Customer Relations Team Leader.", "customer_contact_log_HJ-70397.pdf - A customer contact log relating to escalated complaint HJ-70397. Date of issue: 10 August 2026. 3 pages, complete.", "proposed_resolution_letter_draft_HJ-70397.pdf - A proposed resolution letter draft relating to escalated complaint HJ-70397. Date of issue: 20 August 2026. 2 pages, complete. Signed by the Head of Customer Relations.", "complaint_category_code_sheet_HJ-70397.pdf - A complaint category code sheet relating to escalated complaint HJ-70397. Date of issue: 1 September 2026. Single page.", "returns_policy_HJ-70397.pdf - A copy of the returns policy relating to escalated complaint HJ-70397. Date of issue: 14 July 2026. 2 pages, complete. Signed by the Store Manager.", "store_incident_report_HJ-70397.pdf - A store incident report relating to escalated complaint HJ-70397. Date of issue: 5 July 2026. 2 pages, complete. Signed by the Duty Store Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1062}} {"id": "isc-te-00397-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Ovarheim plc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "6 August 2026"}, "checklist": ["Energy performance certificate, valid (not expired) on the date of the review.", "Title information document.", "If the tenant is a newly formed company, also: signed parent company guarantee (signed).", "Keys handover receipt (signed).", "Asbestos survey report (issued within the last 12 months).", "Signed draft lease (signed).", "If the lease term is longer than seven years, also: land registration application (signed)."], "submission": {"case": {"name": "premises SZ-39951", "reference": "XS-67082", "details": ["Thetestant is an established company.", "The lease term is seven years or less."]}, "documents received": ["Title information document for premises SZ-39951. It shows a date of issue of 8 July 2026. 3 pages, complete.", "Stamp duty return for premises SZ-39951. It shows a date of issue of 18 April 2026 and is signed by the tenant's accountant. 2 pages, complete.", "Signed draft lease for premises SZ-39951. It shows a date of issue of 30 May 2026 and is signed by the landlord and the tenant. 12 pages, complete.", "Energy performance certificate for premises SZ-39951. It shows an expiry date of 10 August 2026. Single page.", "Company search report for premises SZ-39951. It shows a date of issue of 3 August 2026. 2 pages, complete.", "Energy performance certificate for premises SZ-39951. It shows an expiry date of 27 June 2025. Single page.", "Keys handover receipt for premises SZ-39951. It shows a date of issue of 5 July 2026 and is signed by the landlord's agent. Single page.", "Asbestos survey report for premises SZ-39951. It shows a date of issue of 27 December 2025. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 879}} {"id": "isc-te-00307-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Baxwood Group", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "27 May 2026"}, "checklist": ["Confirm the keys handover receipt is present and signed.", "Confirm the signed draft lease is present and signed.", "Confirm the title information document is present.", "Confirm the energy performance certificate is present and valid (not expired) on 27 May 2026.", "If the tenant is a newly formed company, also confirm the signed parent company guarantee is present and signed.", "Confirm the asbestos survey report is present and was issued within the last 12 months.", "Confirm the stamp duty return is present and signed."], "submission": {"case": {"name": "premises BY-30837", "reference": "LN-29332", "details": ["The tenant is a newly formed company."]}, "documents received": ["company-search-report-BY-30837.pdf — Company search report for premises BY-30837, issued 20 May 2026. 2 pages, complete.", "parent-company-guarantee-BY-30837-signed.pdf — Signed parent company guarantee for premises BY-30837, dated 20 March 2026. 3 pages, complete. Signed by the parent company's authorised signatory.", "keys-handover-receipt-BY-30837.pdf — Keys handover receipt for premises BY-30837, issued 3 April 2026. 1 page. Signed by the landlord's managing agent.", "stamp-duty-return-BY-30837.pdf — Stamp duty return for premises BY-30837, issued 8 March 2026. 2 pages, complete. Signed by the tenant's accountant.", "asbestos-survey-report-BY-30837.pdf — Asbestos survey report for premises BY-30837, issued 26 April 2026. 4 pages, complete.", "title-information-document-BY-30837.pdf — Title information document for premises BY-30837, issued 6 February 2026. 3 pages, complete.", "energy-performance-certificate-BY-30837-d.pdf — Energy performance certificate for premises BY-30837, expiring 20 May 2026. 1 page.", "draft-lease-BY-30837-signed.pdf — Signed draft lease for premises BY-30837, dated 29 April 2026. 12 pages, complete. Signed by the tenant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "expired before the review", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 965}} {"id": "isc-te-00487-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Heskness & Co", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "11 August 2026"}, "checklist": ["If the tenant is a newly formed company, also include: signed parent company guarantee (signed)", "If the lease term is longer than seven years, also include: land registration application (signed)", "Check that the keys handover receipt is signed", "Check that the title information document is present", "Check that the signed draft lease is signed", "Check that the stamp duty return is signed", "Check that the asbestos survey report was issued within the last 12 months"], "submission": {"case": {"name": "premises PF-67086", "reference": "NG-35657", "details": ["The tenant is a newly formed company.", "The lease term is longer than seven years."]}, "documents received": ["Parent_Company_Guarantee_PF-67086.pdf - Signed parent company guarantee for premises PF-67086, dated 8 June 2026. 3 pages, complete. Signed by a director of the parent company.", "Asbestos_Survey_Report_PF-67086.pdf - Asbestos survey report for premises PF-67086. 4 pages, complete. The date of issue cannot be seen, as it is covered by a stamp.", "Keys_Handover_Receipt_PF-67086.pdf - Keys handover receipt for premises PF-67086, dated 12 June 2026. Single page. Signed by the landlord's agent.", "Title_Information_Document_PF-67086.pdf - Title information document for premises PF-67086, dated 11 June 2026. 3 pages, complete.", "Signed_Draft_Lease_PF-67086.pdf - Signed draft lease for premises PF-67086, dated 10 June 2026. 12 pages, complete. Signed by the landlord and the tenant.", "Stamp_Duty_Return_PF-67086.pdf - Stamp duty return for premises PF-67086, dated 15 April 2026. 2 pages, complete. Signed by the tenant's accountant.", "Land_Registration_Application_PF-67086.pdf - Land registration application for premises PF-67086, dated 17 June 2026. 2 pages, complete. Signed by the applicant's solicitor."]}}, "question": {"type": "choice", "instructions": "The task is to decide whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete if every applicable line is met (extra documents do not matter). Answer incomplete if at least one applicable line is not met. Answer unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-70", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 941}} {"id": "isc-te-00078-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Dundwyn Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "4 June 2026"}, "checklist": ["Confirm the marketing consent form is present and signed.", "Confirm the customer contact details sheet is present and signed.", "Confirm the loyalty scheme enrolment form is present and signed.", "If the customer is joining as a household account with a shared card, also: confirm the household member details form is present and signed.", "Confirm the initial points balance statement is present and was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also: confirm the points transfer evidence statement is present, was issued within the last 3 months, and is signed."], "submission": {"case": {"name": "Camille Plumopoulos", "reference": "BU-34218", "details": ["The customer is joining as a single-person account.", "The customer is transferring points from a rival scheme."]}, "documents received": ["loyalty_scheme_enrolment_form_plumopoulos_1may2026.pdf: A single-page loyalty scheme enrolment form about Camille Plumopoulos, dated 1 May 2026. The enrolment form has been signed by the customer.", "marketing_consent_form_plumopoulos_31march2026_copy2.pdf: A single-page marketing consent form about Camille Plumopoulos, dated 31 March 2026. The form has been signed by the customer.", "points_transfer_request_plumopoulos_10may2026.pdf: A single-page points transfer request about Camille Plumopoulos, dated 10 May 2026. The request has been signed by the customer.", "initial_points_balance_statement_plumopoulos_21march2026.pdf: A single-page initial points balance statement about Camille Plumopoulos, dated 21 March 2026. The statement shows the starting points balance for the new loyalty account.", "points_transfer_evidence_statement_plumopoulos_23may2026.pdf: a single-page points transfer evidence statement about Camille Plumopoulos, dated 23 May 2026. The statement has been signed by the rival scheme administrator.", "customer_contact_details_sheet_plumopoulos_30may2026.pdf: A single-page customer contact details sheet about Camille Plumopoulos, dated 30 May 2026. The sheet carries the customer's signature."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 916}} {"id": "isc-te-00014-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ambton SAS", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "15 June 2026"}, "checklist": ["Proof of deposit, issued within the last 3 months", "Sale and purchase agreement, signed", "Credit bureau report, issued within the last 1 months", "Property valuation report, issued within the last 6 months and signed", "If the property is being bought from a family member, also: independent purchase price assessment, issued within the last 3 months and signed", "Mortgage application form, signed", "Bank statement, issued within the last 3 months"], "submission": {"case": {"name": "property NI-98706", "reference": "PN-38882", "details": ["The property is being bought from a family member."]}, "documents received": ["Property valuation report for property NI-98706. Date of issue: 12 March 2026. 10 pages, complete. Signed by the valuer.", "Sale and purchase agreement for property NI-98706. Date of issue: 17 May 2026. 9 pages, complete. Signed by the buyer and the seller.", "Mortgage application form for property NI-98706. Date of issue: 25 April 2026. 6 pages, complete. Signed by the applicant.", "Independent purchase price assessment for property NI-98706. Date of issue: 17 May 2026. 2 pages, complete. Signed by the assessor.", "Proof of deposit for property NI-98706. Date of issue: 7 April 2026. 1 page.", "Credit bureau report for property NI-98706. Date of issue: 5 June 2026. 4 pages, complete.", "Bank statement for property NI-98706. Date of issue: 16 May 2026. 3 pages, complete.", "Photo identity document for property NI-98706. Expiry date: 23 December 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 859}} {"id": "isc-te-00229-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Boltmont Ltd", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "15 May 2026"}, "checklist": ["Audit agenda (signed)", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary (issued within the last 3 months, signed)", "Layout tour plan (signed)", "Document control list (issued within the last 3 months, signed)", "Training matrix extract (issued within the last 3 months, signed)", "Audit scope statement (signed)"], "submission": {"case": {"name": "customer audit visit RD-78940", "reference": "ER-54632"}, "documents received": ["RD-78940_training_matrix_extract.pdf — Training matrix extract for customer audit visit RD-78940. Date of issue: 9 March 2026. 3 pages, complete. Signed by the Human Resources Coordinator.", "RD-78940_document_control_list.pdf — Document control list for customer audit visit RD-78940. Date of issue: 14 March 2026. 4 pages, complete. Signed by the Document Control Coordinator.", "RD-78940_audit_agenda.pdf — Audit agenda for customer audit visit RD-78940. Date of issue: 28 February 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_audit_scope_statement.pdf — Audit scope statement for customer audit visit RD-78940. Date of issue: 5 March 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_open_corrective_action_list.pdf — Open corrective action list for customer audit visit RD-78940. Date of issue: 29 April 2026. 2 pages, complete. Signed by the Quality Management Office Manager.", "RD-78940_layout_tour_plan.pdf — Layout tour plan for customer audit visit RD-78940. Date of issue: 22 March 2026. 1 page, signed by the Quality Management Office Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 869}} {"id": "isc-te-00119-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Prydcourt Ltd", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "13 August 2026"}, "checklist": ["Confirm the trial period proposal is included and signed.", "If the employee has caring responsibilities for a dependent, also check for a caring responsibilities statement and confirm it is signed.", "Confirm the client or service impact statement is included and signed.", "Confirm the impact assessment on the team is included and signed.", "Confirm the line manager opinion note is signed and was issued within the last 2 months.", "Confirm the current working pattern statement is issued within the last 3 months.", "Confirm the proposed working pattern plan is included and signed."], "submission": {"case": {"name": "Thiago Lamingham", "reference": "TJ-66574", "details": ["The employee does not have caring responsibilities for a dependent."]}, "documents received": ["flexible working request form – Thiago Lamingham, issued 9 July 2026. 3 pages, complete, signed by Thiago Lamingham.", "proposed working pattern plan – Thiago Lamingham, issued 4 July 2026. 2 pages, complete, signed by the line manager.", "client or service impact statement – Thiago Lamingham, issued 27 June 2026. A single page, signed by the line manager.", "trial period proposal – Thiago Lamingham, issued 1 July 2026. A single page, signed by the line manager.", "impact assessment on the team – Thiago Lamingham, issued 9 May 2026. 3 pages, complete, signed by the line manager.", "current working pattern statement – Thiago Lamingham, issued 17 June 2026. A single page.", "line manager opinion note – Thiago Lamingham, issued 5 July 2026. 2 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 800}} {"id": "isc-te-00442-p2-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Hesklund Group", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "9 March 2026"}, "checklist": ["Alerting rules review note, issued within the last 3 months.", "Remediation items list, issued within the last 3 months, signed.", "Postmortem meeting minutes, issued within the last 3 months, signed.", "Service level objective breach record, issued within the last 3 months."], "submission": {"case": {"name": "production incident SQ-16361", "reference": "TM-87011"}, "documents received": ["remediation-items-list-SQ-16361.pdf — Remediation items list for production incident SQ-16361, dated 7 February 2026. 2 pages, complete. Signed by the reliability engineering team lead.", "service-level-objective-breach-record-SQ-16361.pdf — Service level objective breach record for production incident SQ-16361, dated 26 December 2025. Single page.", "alerting-rules-review-note-SQ-16361.pdf — Alerting rules review note for production incident SQ-16361, dated 27 January 2026. 2 pages, complete.", "postmortem-meeting-minutes-SQ-16361-211225.pdf — Postmortem meeting minutes for production incident SQ-16361, dated 21 December 2025. 3 pages, complete. Signed by the reliability engineering team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 738}} {"id": "isc-te-00032-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Caelley GmbH", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "3 July 2026"}, "checklist": ["Photographs of the spillage on the floor, issued within the last 1 months.", "Cleaning log for the day of the incident, issued within the last 6 months, signed.", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months, signed.", "Liability claim form, signed.", "Incident report from the day, issued within the last 3 months, signed."], "submission": {"case": {"name": "Elvshaw Ltd", "reference": "YZ-88387", "details": ["The customer has appointed a solicitor for the claim."]}, "documents received": ["Elvshaw_Ltd_witness_statement_24_May_2026.pdf. Witness statement from a staff member relating to Elvshaw Ltd. Date of issue shown as 24 May 2026. Single page. Signed by the staff member who witnessed the incident.", "Elvshaw_Ltd_liability_claim_form_16_May_2026.pdf. Liability claim form relating to Elvshaw Ltd. Date of issue shown as 16 May 2026. 3 pages, complete. Signed by the customer.", "Elvshaw_Ltd_spillage_floor_photographs_22_June_2026.pdf. Photographs of the spillage on the floor relating to Elvshaw Ltd. Date of issue shown as 22 June 2026. Single page.", "Elvshaw_Ltd_cleaning_log_24_February_2026.pdf. Cleaning log for the day of the incident relating to Elvshaw Ltd. Date of issue shown as 24 February 2026. Single page. Signed by the duty manager.", "Elvshaw_Ltd_incident_report_29_December_2025.pdf. Incident report from the day relating to Elvshaw Ltd. Date of issue shown as 29 December 2025. 2 pages, complete. Signed by the shop assistant on duty.", "Elvshaw_Ltd_letter_of_claim_31_March_2026.pdf. Letter of claim from the solicitor relating to Elvshaw Ltd. Date of issue shown as 31 March 2026. 3 pages, complete. Signed by the customer's solicitor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 931}} {"id": "isc-te-00232-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Gormshaw GmbH", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "11 March 2026"}, "checklist": ["If the kit contains food samples, also: food handling hygiene certificate (must be valid, that is not expired, on the date of the review)", "Kit cost breakdown (issued within the last 3 months and signed)", "Flammability test certificate (issued within the last 12 months)", "Point of sale design proof (signed)", "Brand colour specification"], "submission": {"case": {"name": "merchandising kit LC-39176", "reference": "WQ-22781", "details": ["The kit contains no food samples."]}, "cover note": "I have put the pack together for merchandising kit LC-39176, but I am not sure everything needed is in there. Please give it a look when you can.", "documents received": ["Kit cost breakdown, merchandising kit LC-39176. The date of issue is 24 December 2025, and it is signed by the retail marketing manager. 2 pages, complete.", "Kit cost breakdown, merchandising kit LC-39176. The date of issue is 16 August 2024, and it is signed by the retail marketing manager. 2 pages, complete.", "Brand colour specification, merchandising kit LC-39176. The date of issue is 3 February 2026. Single page.", "Flammability test certificate, merchandising kit LC-39176. The date of issue is 23 October 2025. Single page.", "Point of sale design proof, merchandising kit LC-39176. The date of issue is 18 January 2026, and it is signed by the design studio lead. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 809}} {"id": "isc-te-00360-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Aldmoor & Co", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "29 May 2026"}, "checklist": ["If the server will be sold or donated rather than destroyed, also: disposal vendor certificate of destruction (issued within the last 3 months, signed)", "network disconnection confirmation (issued within the last 1 months, signed)", "data migration confirmation (issued within the last 3 months, signed)", "final backup confirmation (issued within the last 3 months, signed)", "licence reassignment note (issued within the last 3 months, signed)", "If the server holds archived records that must be kept, also: archive retention confirmation (issued within the last 3 months, signed)", "decommission request form (signed)", "dependent systems check report (issued within the last 3 months)"], "submission": {"case": {"name": "retired server LZ-34741", "reference": "SX-62950", "details": ["The server will be sold or donated rather than destroyed.", "The server holds no records with retention requirements."]}, "documents received": ["Disposal-vendor-certificate-of-destruction_LZ-34741.pdf. Certificate of destruction for retired server LZ-34741, issued 17 April 2026. A single page, signed by the disposal vendor's operations manager.", "Dependent-systems-check-report_LZ-34741.pdf. Dependent systems check report for retired server LZ-34741, issued 15 March 2026. 3 pages, complete.", "Data-migration-confirmation_LZ-34741.pdf. Data migration confirmation for retired server LZ-34741, issued 17 April 2026. 2 pages, complete, signed by the data migration lead.", "Scan_0041.pdf. The scan is blank and too faint to read, so its contents cannot be seen.", "Licence-reassignment-note_LZ-34741.pdf. Licence reassignment note for retired server LZ-34741, issued 25 May 2026. A single page, signed by the licensing coordinator.", "Data-wipe-certificate_LZ-34741.pdf. Data wipe certificate for retired server LZ-34741, issued 12 April 2026. A single page, signed by the data wipe technician.", "Final-backup-confirmation_LZ-34741.pdf. Final backup confirmation for retired server LZ-34741, issued 15 March 2026. A single page, signed by the backup administrator.", "Network-disconnection-confirmation_LZ-34741.pdf. Network disconnection confirmation for retired server LZ-34741, issued 19 May 2026. A single page, signed by the network operations engineer.", "Decommission-request-form_LZ-34741.pdf. Decommission request form for retired server LZ-34741, issued 21 March 2026. 2 pages, complete, signed by the requesting team's system owner."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Examine each checklist line that applies here. A required document counts only if it is the kind of document listed (not a similar one), relates to the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can mislead, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "variant-46", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1086}} {"id": "isc-te-00343-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Ebrton & Co", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "17 March 2026"}, "checklist": ["Check that the radiation safety training certificate is included, that it was issued within the last 24 months and that it is signed.", "Check that the insurance declaration for facility work is included, that it was issued within the last 12 months and that it is signed.", "Check that the photo identity document is included and that it is valid, meaning not expired, on the date of the review.", "Check that the beam time or instrument booking confirmation is included.", "Check that the experiment safety clearance form is included and that it is signed."], "submission": {"case": {"name": "Elif Aldmore", "reference": "NP-73151"}, "documents received": ["d7_host_scientist_invitation_letter_elif_aldmore.pdf. Host scientist invitation letter for Elif Aldmore, issued on 18 January 2026. It is a single page and is signed by the host scientist.", "d8_experiment_safety_clearance_form_signed_elif_aldmore.pdf. Experiment safety clearance form for Elif Aldmore, issued on 15 January 2026. All 3 pages are included, and the form is signed by the experiment safety officer.", "d3_photo_identity_document_elif_aldmore.pdf. Photo identity document for Elif Aldmore, with an expiry date of 10 February 2028. It is a single page.", "d4_beam_time_booking_confirmation_elif_aldmore.pdf. Beam time or instrument booking confirmation for Elif Aldmore, issued on 23 December 2025. It is a single page.", "d2_insurance_declaration_facility_work_elif_aldmore.pdf. Insurance declaration for facility work for Elif Aldmore, issued on 18 December 2025. It is a single page and is signed by the insurance provider's authorised representative.", "d9_scan_file.pdf. The contents of this file cannot be seen, as the scan is blank.", "d1_radiation_safety_training_certificate_elif_aldmore.pdf. Radiation safety training certificate for Elif Aldmore, issued on 7 April 2024. It is a single page and is signed by the radiation safety training officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "partial", "defect": "signed, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 891}} {"id": "isc-te-00123-p5-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Thalhall GmbH", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "7 July 2026"}, "checklist": ["Drying contractor's certificate of completion, issued within the last 6 months and signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "Flood claim form, signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Buildings insurance policy schedule"], "submission": {"case": {"name": "property TU-69693", "reference": "ED-62889"}, "documents received": ["Buildings insurance policy schedule for property TU-69693, dated 7 June 2026. 5 pages, complete.", "Flood claim form for property TU-69693, dated 4 April 2026. 5 pages, complete. Signed by the claimant.", "Drying contractor's certificate of completion for property TU-69693, dated 20 June 2026. 2 pages, complete. Signed by the drying contractor.", "Photographs of flood water in the rooms for property TU-69693, dated 17 June 2026. Pages 1-2 of 3.", "Utility supplier's letter confirming the supply was cut off for property TU-69693, dated 9 August 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 710}} {"id": "isc-te-00123-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Thalhall GmbH", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "7 July 2026"}, "checklist": ["Drying contractor's certificate of completion, issued within the last 6 months and signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "Flood claim form, signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Buildings insurance policy schedule"], "submission": {"case": {"name": "property TU-69693", "reference": "ED-62889"}, "documents received": ["Utility supplier's letter confirming the supply was cut off for property TU-69693, dated 9 August 2025. 1 page.", "Flood claim form for property TU-69693, dated 4 April 2026. 5 pages, complete. Signed by the claimant.", "Debris removal invoice for property TU-69693, dated 18 May 2026. 1 page.", "Photographs of flood water in the rooms for property TU-69693, dated 17 June 2026. Pages 1-2 of 3.", "Buildings insurance policy schedule for property TU-69693, dated 7 June 2026. 5 pages, complete.", "Drying contractor's certificate of completion for property TU-69693, dated 20 June 2026. 2 pages, complete. Signed by the drying contractor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00439-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Boltfeld plc", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "4 August 2026"}, "checklist": ["Merchant account agreement, signed.", "Data protection impact assessment, issued within the last 12 months, signed.", "Fraud screening configuration sheet, signed.", "If the gateway will handle recurring subscription payments, also: subscription billing mandate template, signed.", "Gateway integration request form, signed.", "Test environment transaction log, issued within the last 1 months.", "Penetration test summary, issued within the last 6 months, signed."], "submission": {"case": {"name": "payment gateway DN-3787", "reference": "YB-55164"}, "documents received": ["Go-live sign-off certificate for payment gateway DN-3787. Dated 1 August 2026. Single page. Signed by the head of payments and IT security.", "Fraud screening configuration sheet for payment gateway DN-3787. Dated 27 April 2026. Single page. Signed by the fraud screening lead.", "Data protection impact assessment for payment gateway DN-3787. Dated 14 September 2025. 5 pages, complete. Signed by the data protection officer.", "Gateway integration request form for payment gateway DN-3787. Dated 4 June 2026. 2 pages, complete. Signed by the requesting manager.", "Test environment transaction log for payment gateway DN-3787. Dated 20 July 2026. 4 pages, complete.", "Subscription billing mandate template for payment gateway DN-3787. Dated 27 May 2026. 2 pages, complete. Signed by the billing operations manager.", "Merchant account agreement for payment gateway DN-3787. Dated 11 June 2026. 6 pages, complete. Signed by the merchant account holder.", "Penetration test summary for payment gateway DN-3787. Dated 19 February 2026. 3 pages, complete. Signed by the penetration tester."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 854}} {"id": "isc-te-00158-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Yarvgate & Co", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "28 May 2026"}, "checklist": ["Knowledge test pass certificate on file", "Driver declaration of convictions, signed, on file", "Photo driving licence on file, valid on the date of the review and not expired", "Medical examination certificate on file, issued within the last 6 months and signed", "Licence application form on file, signed", "Criminal record check on file, issued within the last 3 months"], "submission": {"case": {"name": "Anna Lundcombe", "reference": "EX-98046"}, "documents received": ["Driver declaration of convictions for Anna Lundcombe, dated 8 March 2026. Signed by the driver, Anna Lundcombe. Single page.", "Photo driving licence for Anna Lundcombe, expiring 30 January 2027. 2 pages, complete.", "Medical examination certificate for Anna Lundcombe, dated 25 May 2026. 2 pages, complete. Signed by the examining doctor.", "Licence application form for Anna Lundcombe, dated 20 April 2026. 6 pages, complete. Signed by the applicant, Anna Lundcombe.", "Criminal record check for Anna Lundcombe, dated 15 May 2026. 6 pages, complete.", "Knowledge test pass certificate for Anna Lundcombe, dated 21 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 706}} {"id": "isc-te-00418-p3-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Kestside Partners", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "1 July 2026"}, "checklist": ["Passport for Xiu Jessby, valid (not expired) on the date of the review, 1 July 2026.", "Three months of bank statements, issued within the last 3 months.", "Proof of deposit savings, issued within the last 3 months.", "Mortgage application form, issued within the last 3 months, signed."], "submission": {"case": {"name": "Xiu Jessby", "reference": "MR-93438"}, "cover note": "Please find attached everything needed for this mortgage application pack. All items are complete.", "documents received": ["Three months of bank statements for Xiu Jessby, dated 20 May 2026. 9 pages, complete.", "Mortgage application form for Xiu Jessby, dated 17 May 2026, signed by the borrower. 10 pages, complete.", "Passport for Xiu Jessby, with expiry date 15 February 2027. Pages 1-1 of 2, one page included out of 2.", "Proof of deposit savings for Xiu Jessby, dated 24 June 2026. 2 pages, complete.", "Property valuation report for Xiu Jessby, dated 22 June 2026, signed by the valuer. 8 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 707}} {"id": "isc-te-00137-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Fravmouth Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "15 July 2026"}, "checklist": ["Supplier quality questionnaire, issued within the last 12 months, signed.", "Supplier self-assessment report, issued within the last 12 months, signed.", "If the supplier provides parts that are safety-critical, also: process failure mode and effects analysis, signed.", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months, signed.", "Supplier audit report, issued within the last 24 months, signed.", "Financial stability statement, issued within the last 12 months, signed.", "Supplier capacity declaration, issued within the last 12 months, signed.", "Raw material certificate of analysis, issued within the last 6 months, signed."], "submission": {"case": {"name": "Mersley SAS", "reference": "XW-63469", "details": ["The supplier provides parts that are safety-critical.", "The supplier subcontracts part of the production."]}, "documents received": ["Subcontractor approval record, Mersley SAS. Date of issue: 9 August 2025. 2 pages, complete. Signed by the supplier's quality manager.", "Supplier audit report, Mersley SAS. Date of issue: 19 March 2025. 8 pages, complete. Signed by the lead auditor.", "Supplier capacity declaration, Mersley SAS. Date of issue: 26 July 2025. 2 pages, complete. Signed by the supplier's operations manager.", "Raw material certificate of analysis, Mersley SAS. Date of issue: 22 April 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Financial stability statement, Mersley SAS. Date of issue: 7 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Supplier corrective action plan, Mersley SAS. Date of issue: 8 May 2026. 3 pages, complete. Signed by the supplier's quality manager.", "Process failure mode and effects analysis, Mersley SAS. Date of issue: 1 June 2026. 9 pages, complete. Signed by the supplier's process engineer.", "Supplier quality questionnaire, Mersley SAS. Date of issue: 21 June 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Supplier self-assessment report, Mersley SAS. Date of issue: 18 October 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Supplier capacity declaration, Mersley SAS. Date of issue: 14 February 2024. 2 pages, complete. Signed by the supplier's operations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 8, "n_conditional": 2, "n_documents": 10, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1011}} {"id": "isc-te-00035-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Elvshaw Inc", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "1 September 2026"}, "checklist": ["Fit-out cost estimate, issued within the last 6 months and signed", "Pilot operation audit report, issued within the last 6 months and signed", "Franchise application form, signed", "Franchise disclosure document receipt, issued within the last 3 months and signed"], "submission": {"case": {"name": "Eskmouth GmbH", "reference": "WJ-35437"}, "documents received": ["Eskmouth_GmbH_fit-out_cost_estimate.pdf — Fit-out cost estimate for Eskmouth GmbH, dated 15 May 2026. 4 pages, complete. Signed by the franchisor's head of construction.", "Eskmouth_GmbH_franchise_application_form.pdf — Franchise application form for Eskmouth GmbH, dated 18 June 2026. 3 pages, complete. Signed by the managing director of Eskmouth GmbH.", "Eskmouth_GmbH_franchise_agreement_counterpart.pdf — Signed franchise agreement counterpart for Eskmouth GmbH, dated 14 July 2026. 12 pages, complete. Signed by the franchisor's legal counsel and the managing director of Eskmouth GmbH.", "Eskmouth_GmbH_franchise_disclosure_document_receipt.pdf — Franchise disclosure document receipt for Eskmouth GmbH, dated 2 August 2026. 1 page. Signed by the managing director of Eskmouth GmbH."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 713}} {"id": "isc-te-00063-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ivrby Partners", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "15 July 2026"}, "checklist": ["Certificate of insurance, valid (not expired) on the date of the review.", "Supplier registration form, signed.", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed.", "Bank details confirmation letter, issued within the last 3 months, signed.", "Anti-bribery policy statement, signed.", "Company tax clearance certificate, valid (not expired) on the date of the review.", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid (not expired) on the date of the review."], "submission": {"case": {"name": "Corvcrest Ltd", "reference": "QW-68059", "details": ["The supplier is a domestic company.", "The supplier is a small business with a single owner."]}, "documents received": ["Supplier registration form for Corvcrest Ltd. It is dated 24 April 2026 and is signed by an authorised representative of the supplier. 3 pages, complete.", "Copy of the owner's photo identification for Corvcrest Ltd. It shows an expiry date of 9 February 2028 and is a single page.", "Company tax clearance certificate for Corvcrest Ltd. It shows an expiry date of 29 December 2026 and is a single page.", "Anti-bribery policy statement for Corvcrest Ltd. It is dated 22 June 2026 and is signed by an authorised representative of the supplier. 2 pages, complete.", "Bank details confirmation letter for Corvcrest Ltd. It is dated 20 June 2026, is a single page, and is signed by the supplier's finance manager.", "Certificate of insurance for Corvcrest Ltd. It shows an expiry date of 18 July 2028. Pages 1-1 of 2 are included."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Examine each checklist line that applies here. A required document counts only if it is the kind of document listed (not a similar one), relates to the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can mislead, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-46", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00470-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Stervberg Ltd", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "9 March 2026"}, "checklist": ["Location details sheet", "Cost estimate issued within the last 3 months, signed", "Job request form, signed", "Parts order confirmation issued within the last 1 months", "Access authorisation slip, signed"], "submission": {"case": {"name": "maintenance request YF-33794", "reference": "GP-45887"}, "cover note": "Please review the attached pack for maintenance request YF-33794, reference GP-45887. I am not certain that everything required has been included.", "documents received": ["File scan_002.pdf. The scan is blank and will not display any readable content.", "Parts order confirmation for maintenance request YF-33794, dated 5 March 2026. 1 page.", "Access authorisation slip for maintenance request YF-33794, dated 16 February 2026. 1 page. Signed by the site security officer.", "Location details sheet for maintenance request YF-33794, dated 23 January 2026. 1 page.", "Risk assessment for the task under maintenance request YF-33794, dated 21 January 2026. 5 pages, complete. Signed by the assessing officer.", "Job request form for maintenance request YF-33794, dated 16 February 2026. 1 page. Signed by the requesting manager.", "Cost estimate for maintenance request YF-33794, dated 7 February 2026. 2 pages, complete. Signed by the estimating supervisor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 776}} {"id": "isc-te-00075-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Baxton Limited", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 April 2026"}, "checklist": ["Confirm the pack contains the marketing consent form, signed.", "Confirm the pack contains the nominated store preference form, signed.", "Confirm the pack contains the identity verification document, valid and not expired on the date of the review.", "Confirm the pack contains the loyalty scheme enrolment form, signed.", "If the customer is transferring points from a rival scheme, also: confirm the pack contains the points transfer evidence statement, issued within the last 3 months and signed.", "Confirm the pack contains the points transfer request, signed.", "Confirm the pack contains the terms and conditions acceptance sheet, signed."], "submission": {"case": {"name": "Katerina Wraxsall", "reference": "SQ-40557", "details": ["The customer is transferring points from a rival scheme."]}, "cover note": "I am sorry that this pack was put together in a rush. I would appreciate your patience as you review it.", "documents received": ["Marketing consent form - Katerina Wraxsall.pdf. This single-page marketing consent form concerning Katerina Wraxsall is dated 20 March 2026 and carries the signature of the customer.", "Identity verification document - Katerina Wraxsall.pdf. This single-page identity verification document concerning Katerina Wraxsall shows an expiry date of 4 May 2028.", "File 09.pdf. The contents of this file cannot be seen, as the scan is blank.", "Terms and conditions acceptance sheet - Katerina Wraxsall.pdf. This single-page terms and conditions acceptance sheet concerning Katerina Wraxsall is dated 10 March 2026 and carries the signature of the customer.", "Initial points balance statement - Katerina Wraxsall.pdf. This single-page initial points balance statement concerning Katerina Wraxsall is dated 22 February 2026.", "Points transfer evidence statement - Katerina Wraxsall.pdf. This single-page points transfer evidence statement concerning Katerina Wraxsall is dated 11 February 2026 and carries the signature of the customer.", "Points transfer request - Katerina Wraxsall.pdf. This single-page points transfer request concerning Katerina Wraxsall is dated 17 January 2026 and carries the signature of the customer.", "Nominated store preference form - Katerina Wraxsall.pdf. This single-page nominated store preference form concerning Katerina Wraxsall is dated 18 March 2026 and carries the signature of the customer.", "Loyalty scheme enrolment form - Katerina Wraxsall.pdf. This single-page loyalty scheme enrolment form concerning Katerina Wraxsall is dated 2 April 2026 and carries the signature of the customer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1022}} {"id": "isc-te-00384-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Jundburg Partners", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "8 June 2026"}, "checklist": ["Confirm the pack contains the plant room access sign-in sheet.", "Confirm the pack contains the thermostat calibration certificate, issued within the last 12 months.", "Confirm the pack contains the engineer F-gas handling certificate, valid (not expired) on the date of the review.", "Confirm the pack contains the F-gas leak check record, issued within the last 12 months and signed.", "Confirm the pack contains the refrigerant top-up log, issued within the last 1 months and signed.", "Confirm the pack contains the system pressure test results, issued within the last 1 months and signed.", "If refrigerant was added during the service, also confirm the pack contains the refrigerant recovery note, issued within the last 1 months and signed."], "submission": {"case": {"name": "air conditioning system QA-33718", "reference": "FF-66011", "details": ["No refrigerant was added during the service."]}, "cover note": "Please find the pack enclosed. Apologies that it was put together in a rush. Let me know if you have any queries.", "documents received": ["Refrigerant top-up log for air conditioning system QA-33718, dated 31 May 2026. 1 page. Signed by the servicing engineer.", "Engineer F-gas handling certificate for air conditioning system QA-33718, showing an expiry date of 1 November 2028. 1 page.", "System pressure test results for air conditioning system QA-33718, dated 26 May 2026. 2 pages, complete. Signed by the servicing engineer.", "F-gas leak check record for air conditioning system QA-33718, dated 5 October 2025. 2 pages, complete. Signed by the servicing engineer.", "Plant room access sign-in sheet for air conditioning system QA-33718, dated 4 April 2026. 1 page.", "Engineer's service report for air conditioning system QA-33718, dated 19 May 2026. 3 pages, complete. Signed by the servicing engineer.", "Thermostat calibration certificate for air conditioning system QA-33718, dated 10 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 925}} {"id": "isc-te-00398-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Prydhaven Ltd", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "3 July 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include the mediation request confirmation, issued within the last 1 months and signed", "Cure period expiry calculation, issued within the last 1 months and signed", "Losses calculation statement, issued within the last 1 months and signed", "Breach evidence log, issued within the last 1 months and signed", "Default notice previously served, issued within the last 6 months and signed", "Termination clause legal opinion, issued within the last 1 months and signed", "Original service agreement copy"], "submission": {"case": {"name": "Aldstow Group", "reference": "KZ-59584", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Default_notice_previously_served_Aldstow_Group_16_June_2026.pdf — Default notice previously served on Aldstow Group, dated 16 June 2026. 1 page. Signed by the Contracts Manager.", "Mediation_request_confirmation_Aldstow_Group_29_June_2026.pdf — Mediation request confirmation concerning Aldstow Group, dated 29 June 2026. 1 page. Signed by the Head of Dispute Resolution.", "Cure_period_expiry_calculation_Aldstow_Group_18_June_2026.pdf — Cure period expiry calculation concerning Aldstow Group, dated 18 June 2026. 2 pages, complete. Signed by the Contracts Manager.", "Original_service_agreement_copy_Aldstow_Group_23_April_2026.pdf — Original service agreement copy concerning Aldstow Group, dated 23 April 2026. 10 pages, complete.", "Termination_clause_legal_opinion_Aldstow_Group_1_July_2026.pdf — Termination clause legal opinion concerning Aldstow Group, dated 1 July 2026. 5 pages, complete. Signed by the Legal Counsel.", "Breach_evidence_log_Aldstow_Group_13_June_2026.pdf — Breach evidence log concerning Aldstow Group, dated 13 June 2026. 6 pages, complete. The signature line is empty; the document is not signed.", "Losses_calculation_statement_Aldstow_Group_13_June_2026.pdf — Losses calculation statement concerning Aldstow Group, dated 13 June 2026. 3 pages, complete. Signed by the Finance Director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 977}} {"id": "isc-te-00350-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Pravfell plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "19 August 2026"}, "checklist": ["Check the remediation items list, issued within the last 3 months, signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months, signed.", "Check the follow-up owner assignment sheet, issued within the last 3 months, signed.", "Check the postmortem meeting minutes, issued within the last 3 months, signed.", "Check the customer impact statement, issued within the last 3 months.", "If the incident involved a data leak to an outside party, also: data breach notification record, issued within the last 3 months, signed.", "Check the incident timeline, issued within the last 3 months."], "submission": {"case": {"name": "production incident ZQ-13927", "reference": "EV-82488", "details": ["The incident was caused entirely by internal systems.", "The incident involved a data leak to an outside party."]}, "documents received": ["Service level objective breach record for production incident ZQ-13927, issued 28 July 2026, single page.", "Root cause analysis report for production incident ZQ-13927, issued 11 August 2026, 5 pages, complete, signed by the root cause analysis author.", "Data breach notification record for production incident ZQ-13927, issued 20 July 2026, 2 pages, complete, signed by the data protection officer.", "Postmortem meeting minutes for production incident ZQ-13927, issued 25 June 2026, 3 pages, complete, signed by the postmortem chair.", "Follow-up owner assignment sheet for production incident ZQ-13927, issued 28 July 2026, single page, signed by the reliability engineering lead.", "Incident timeline for production incident ZQ-13927, issued 22 June 2026, 3 pages, complete.", "Remediation items list for production incident ZQ-13927, issued 10 June 2026, 2 pages, complete, signed by the incident remediation lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 900}} {"id": "isc-te-00448-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Veystead Inc", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "24 July 2026"}, "checklist": ["Credit card in the driver's name (valid, i.e. not expired, on the date of the review, signed)", "Vehicle condition report (signed)", "Passport (valid, i.e. not expired, on the date of the review, signed)", "If the booking includes crossing a land border, also: cross-border travel permission (signed)", "Booking voucher (issued within the last 6 months)", "Insurance excess waiver certificate (valid, i.e. not expired, on the date of the review)", "Driving licence (valid, i.e. not expired, on the date of the review, signed)"], "submission": {"case": {"name": "Amelia Tadridge", "reference": "LS-38914", "details": ["The booking includes crossing a land border."]}, "documents received": ["Vehicle condition report, Amelia Tadridge. Date of issue: 29 April 2026. 2 pages, complete. Signed by the branch counter staff member.", "Driving licence, Amelia Tadridge. Expiry date: 9 December 2026. 2 pages, complete. Signed by the licence holder.", "Credit card in the driver's name, Amelia Tadridge. Expiry date: 25 February 2028. Single page; the signature line is empty, so the card is not signed.", "Passport, Amelia Tadridge. Expiry date: 17 February 2028. Single page. Signed by the passport holder.", "Booking voucher, Amelia Tadridge. Date of issue: 25 May 2026. Single page.", "Cross-border travel permission, Amelia Tadridge. Date of issue: 28 June 2026. Single page. Signed by the branch counter staff member.", "Insurance excess waiver certificate, Amelia Tadridge. Expiry date: 3 June 2027. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every line of the checklist that applies here. A required document only counts if it is the type of document listed (not a similar type), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it had not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-1", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 829}} {"id": "isc-te-00211-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Fervside LLP", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "14 April 2026"}, "checklist": ["Flood claim form, signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "If the flood water reached the upper floor of the property, also: upper floor damage schedule, signed", "Buildings insurance policy schedule", "Council flood warning notice, issued within the last 12 months", "Photographs of flood water in the rooms, issued within the last 1 months"], "submission": {"case": {"name": "property FN-55122", "reference": "BL-30475", "details": ["The flood water stayed at ground floor level."]}, "documents received": ["Flood claim form for property FN-55122. Date of issue: 22 March 2026. 5 pages, complete. Signed by the claimant.", "Buildings insurance policy schedule for property FN-55122. Date of issue: 1 February 2026. 5 pages, complete.", "Council flood warning notice for property FN-55122. Date of issue: 23 December 2025. 1 page.", "Photographs of flood water in the rooms at property FN-55122. Date of issue: 2 April 2026. 3 pages, complete.", "File: scan-0414-a. The file will not open, so its contents cannot be seen."]}}, "question": {"type": "choice", "instructions": "Does the pack measure up to the checklist? Examine every checklist line that applies here. A required document only counts if it is the kind of document listed (not a similar one), relates to the subject of the case, contains all its pages, carries a signature wherever the checklist asks for one, had not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Use complete if every applicable line is met (extra documents do not matter). Use incomplete if at least one applicable line is not met. Use unclear if no line is clearly unmet but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-23", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 731}} {"id": "isc-te-00086-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Zervcourt plc", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "3 June 2026"}, "checklist": ["Check the passport: it must be valid, meaning not expired, on 3 June 2026, and it must be signed.", "Check the vehicle condition report: it must be signed.", "Check the booking voucher: it must have been issued within the last 6 months.", "Check the credit card in the driver's name: it must be valid, meaning not expired, on 3 June 2026, and it must be signed."], "submission": {"case": {"name": "Sanne Plumard", "reference": "MC-25332"}, "cover note": "I am sorry that this pack was put together in a rush. Please let me know if anything needs my attention.", "documents received": ["Fuel policy sheet - Sanne Plumard.pdf - Fuel policy sheet for Sanne Plumard. It shows a date of issue of 18 April 2026. It is a single page, signed by the rental branch counter staff member.", "Vehicle condition report - Sanne Plumard.pdf - Vehicle condition report for Sanne Plumard. It shows a date of issue of 21 February 2026. It is 2 pages, complete, and it is signed by the inspecting branch staff member.", "Price comparison screenshot - Sanne Plumard.png - Price comparison screenshot from a search website for Sanne Plumard. It shows a date of issue of 31 March 2026. It is a single page.", "Credit card - Sanne Plumard.jpg - Credit card in the driver's name for Sanne Plumard. It shows an expiry date of 22 October 2027. It is a single page, signed by the cardholder.", "Passport - Sanne Plumard.jpg - Passport belonging to Sanne Plumard. It shows an expiry date of 24 November 2026. It is a single page, signed by the passport holder.", "Booking voucher - Sanne Plumard.pdf - Booking voucher for Sanne Plumard. It shows a date of issue of 31 March 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 882}} {"id": "isc-te-00150-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Jarlmouth LLP", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "17 June 2026"}, "checklist": ["If the supplier is a foreign company, also: certified translation of the certificate of incorporation (signed)", "Certificate of incorporation", "Supplier declaration of no conflicts of interest (signed)", "Bank details confirmation letter (issued within the last 3 months, signed)", "Supplier registration form (signed)"], "submission": {"case": {"name": "Xanhall Inc", "reference": "EC-70750", "details": ["The supplier is a domestic company."]}, "documents received": ["Supplier registration form for Xanhall Inc, dated 12 May 2026. 3 pages, complete, signed by an authorised company representative.", "Supplier declaration of no conflicts of interest for Xanhall Inc, dated 18 May 2026. Single page, signed by a company director.", "Signed copy of the general terms and conditions for Xanhall Inc, dated 29 May 2026. 6 pages, complete, signed by an authorised company representative.", "Bank details confirmation letter for Xanhall Inc, issued 5 May 2026. Single page, signed by a bank officer.", "Certificate of incorporation for Xanhall Inc, issued 19 February 2026. 2 pages, complete.", "Certificate of insurance for Xanhall Inc, showing an expiry date of 31 October 2027. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete when checked against the checklist. Consider every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete: every applicable line is met (extra documents do not matter). Return incomplete: at least one applicable line is not met. Return unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-18", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 735}} {"id": "isc-te-00362-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Dornham Ltd", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "27 July 2026"}, "checklist": ["Leaver notification form, signed.", "Equipment return receipt, issued within the last 1 months, signed.", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed.", "Final payroll cut-off note, issued within the last 1 months, signed.", "Service desk ticket closure summary, issued within the last 1 months.", "Shared mailbox handover record, issued within the last 1 months, signed.", "Non-disclosure reminder acknowledgement, signed."], "submission": {"case": {"name": "Niamh Gillock", "reference": "GB-48986", "details": ["The leaver held no privileged administrator accounts."]}, "documents received": ["A service desk ticket closure summary for Niamh Gillock, dated 10 July 2026. 3 pages, complete.", "A final payroll cut-off note for Niamh Gillock, dated 16 July 2026. Single page. Signed by the payroll officer.", "A non-disclosure reminder acknowledgement for Niamh Gillock, dated 19 April 2026. Single page. Signed by Niamh Gillock.", "A leaver notification form for Niamh Gillock, dated 3 May 2026. 2 pages, complete. Signed by the line manager.", "An access rights inventory for Niamh Gillock, dated 10 July 2026. 4 pages, complete.", "A shared mailbox handover record for Niamh Gillock, dated 23 July 2026. 2 pages, complete. Signed by the incoming mailbox owner.", "An equipment return receipt for Niamh Gillock. The date of issue is covered by a stamp. Single page. Signed by the receiving IT asset officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 815}} {"id": "isc-te-00254-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Elvwater BV", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 June 2026"}, "checklist": ["Annual activity report, issued within the last 6 months, signed.", "If the institute received industry funding above the university's disclosure threshold, also: industry funding disclosure statement, issued within the last 12 months, signed.", "Staffing plan, issued within the last 6 months, signed.", "Financial expenditure summary, issued within the last 3 months, signed.", "Doctoral researcher progress summary, issued within the last 6 months, signed.", "Intellectual property register extract, issued within the last 6 months, signed.", "Director's declaration of interests, issued within the last 12 months, signed."], "submission": {"case": {"name": "Wendmere Inc", "reference": "GI-71566", "details": ["The institute received industry funding above the university's disclosure threshold."]}, "cover note": "Please could you approve this pack quickly, as all the paperwork is in order.", "documents received": ["Wendmere Inc doctoral researcher progress summary.pdf - A doctoral researcher progress summary for Wendmere Inc, dated 22 January 2026. It has 2 pages, complete, and is signed by the doctoral programme coordinator.", "Wendmere Inc financial expenditure summary.pdf - A financial expenditure summary for Wendmere Inc, dated 16 April 2026. It has 3 pages, complete, and is signed by the institute finance officer.", "Wendmere Inc director's declaration of interests.pdf - A director's declaration of interests for Wendmere Inc, dated 28 February 2026. It is a single page and is signed by the institute director.", "Wendmere Inc external advisory board minutes.pdf - Minutes of the external advisory board for Wendmere Inc, dated 10 February 2026. They have 4 pages, complete, and are signed by the board secretary.", "Wendmere Inc staffing plan.pdf - A staffing plan for Wendmere Inc, dated 3 April 2026. It has 2 pages, complete, and is signed by the institute director.", "Wendmere Inc annual activity report.pdf - An annual activity report for Wendmere Inc, dated 2 April 2026. It has 12 pages, complete, and is signed by the institute director.", "Wendmere Inc intellectual property register extract.pdf - An intellectual property register extract for Wendmere Inc, dated 11 February 2026. It is a single page and is signed by the head of technology transfer."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Work through every checklist line that applies to this case one by one. For a required document to count, it must be the exact kind of document listed (not a similar one), be about the subject of the case, contain all its pages, be signed where the checklist asks for a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line only applies when its circumstance holds for the case. complete: all applicable lines are met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-68", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 956}} {"id": "isc-te-00454-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Jundmouth Limited", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "25 March 2026"}, "checklist": ["Licence reassignment note, issued within the last 3 months, signed", "If the server will be sold or donated rather than destroyed, also: disposal vendor certificate of destruction, issued within the last 3 months, signed", "Decommission request form, signed", "Data wipe certificate, issued within the last 3 months, signed", "Data migration confirmation, issued within the last 3 months, signed", "Dependent systems check report, issued within the last 3 months"], "submission": {"case": {"name": "retired server NC-63421", "reference": "LV-96718", "details": ["The server will be sold or donated rather than destroyed."]}, "documents received": ["Data migration confirmation for retired server NC-63421, dated 19 January 2026. 2 pages, complete. Signed by the systems migration lead.", "Single-page licence reassignment note for retired server NC-63421, dated 10 March 2026, signed by the IT asset manager.", "Single-page data wipe certificate for retired server NC-63421, dated 29 January 2026, signed by the disposal technician.", "Decommission request form for retired server NC-63421, dated 4 February 2026. 2 pages, complete. Signed by the infrastructure operations manager.", "Dependent systems check report for retired server NC-63421, dated 13 March 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 757}} {"id": "isc-te-00199-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Silridge Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "18 March 2026"}, "checklist": ["Delegate photo identification that is valid, meaning not expired, on the date of the review.", "Cancellation policy acceptance, signed.", "Special requirements note.", "Employer sponsorship letter issued within the last 3 months, signed.", "Venue access instructions issued within the last 3 months.", "If the course leads to a licensed qualification, also: licence eligibility declaration, signed.", "Prerequisite certificate."], "submission": {"case": {"name": "course booking PG-59381", "reference": "XR-38194", "details": ["The course leads to a licensed qualification."]}, "documents received": ["Venue access instructions, course booking PG-59381. Issued 13 February 2026. 1 page.", "Employer sponsorship letter, course booking PG-59381. Issued 7 March 2026. Signed by the employer's authorised signatory. 1 page.", "Prerequisite certificate, course booking PG-59381. Issued 16 December 2025. 1 page.", "Course booking form, course booking PG-59381. Issued 28 November 2025. 2 pages, complete. Signed by the delegate. 1 page.", "Special requirements note, course booking PG-59381. Issued 26 January 2026. 1 page.", "Payment confirmation, course booking PG-59381. Issued 2 February 2026. 1 page.", "Cancellation policy acceptance, course booking PG-59381. Issued 7 February 2026. Signed by the delegate. 1 page.", "Delegate photo identification, course booking PG-59381. The identification expires on 28 November 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Your job is to say whether the pack is complete against the checklist. Go through all checklist lines that apply to this case. To count, a required document must be the kind of document listed rather than a similar one, must be about the subject of the case, must have all its pages, must be signed wherever the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-62", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 835}} {"id": "isc-te-00374-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Iskgate Limited", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "19 August 2026"}, "checklist": ["Mortgage application form, signed.", "Proof of deposit, issued within the last 3 months.", "If the property is being bought from a family member, also: independent purchase price assessment, issued within the last 3 months, signed.", "Property valuation report, issued within the last 6 months, signed.", "Credit bureau report, issued within the last 1 months.", "Employment certificate, issued within the last 1 months, signed.", "Sale and purchase agreement, signed."], "submission": {"case": {"name": "property HJ-44730", "reference": "BV-35753", "details": ["The property is being bought from a family member."]}, "documents received": ["Property valuation report - property HJ-44730.pdf. Property valuation report for property HJ-44730, dated 4 July 2026. 10 pages, complete. Signed by the valuer.", "Photo identity document - property HJ-44730.pdf. Photo identity document for property HJ-44730, with expiry date 26 April 2028. Single page.", "Employment certificate - property HJ-44730.pdf. Employment certificate for property HJ-44730, dated 14 August 2026. Single page. Signed by the employer.", "Proof of deposit - property HJ-44730.pdf. Proof of deposit for property HJ-44730, dated 10 July 2026. Single page.", "Credit bureau report - property HJ-44730.pdf. Credit bureau report for property HJ-44730, dated 30 July 2026. 4 pages, complete.", "Sale and purchase agreement - property HJ-44730.pdf. Sale and purchase agreement for property HJ-44730, dated 27 July 2026. 9 pages, complete. Signed by the purchasers.", "Mortgage application form - property HJ-44730.pdf. Mortgage application form for property HJ-44730, dated 30 July 2026. 6 pages, complete. Signed by the applicant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 916}} {"id": "isc-te-00209-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Corvley Limited", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "29 May 2026"}, "checklist": ["Check that the proposed working pattern plan is included and signed.", "Check that the flexible working request form is included and signed.", "Check that the impact assessment on the team is included and signed.", "If the employee has caring responsibilities for a dependent, also: check that the caring responsibilities statement is included and signed.", "Check that the trial period proposal is included and signed."], "submission": {"case": {"name": "Harry Holtisey", "reference": "NC-90327", "details": ["The employee does not have caring responsibilities for a dependent."]}, "cover note": "Please find attached the pack for reference NC-90327. I am not sure everything needed is there, so please confirm when you can.", "documents received": ["A previous flexible working requests record concerning Harry Holtisey, dated 12 July 2025. Single page.", "A proposed working pattern plan concerning Harry Holtisey, dated 4 May 2026. 2 pages, complete. Signed by the line manager.", "A flexible working request form concerning Harry Holtisey, dated 23 February 2026. 3 pages, complete. Signed by Harry Holtisey.", "A current working pattern statement concerning Harry Holtisey, dated 12 April 2026. Single page.", "A trial period proposal concerning Harry Holtisey, dated 7 April 2026. Single page. Signed by the line manager.", "An impact assessment on the team concerning Harry Holtisey, dated 1 February 2026. 3 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "You must decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-72", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 770}} {"id": "isc-te-00391-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Ulmcourt Ltd", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "2 June 2026"}, "checklist": ["Loss adjuster's inspection report, issued within the last 6 months and signed.", "Buildings insurance policy schedule.", "Flood claim form, signed.", "Council flood warning notice, issued within the last 12 months.", "Drying contractor's certificate of completion, issued within the last 6 months and signed.", "Debris removal invoice, issued within the last 6 months."], "submission": {"case": {"name": "property DY-13315", "reference": "DZ-33746"}, "cover note": "This pack was already checked by a colleague before it reached you.", "documents received": ["Buildings insurance policy schedule for property DY-13315, dated 26 April 2026. 5 pages, complete.", "Photographs of flood water in the rooms at property DY-13315, dated 21 May 2026. 3 pages, complete.", "Loss adjuster's inspection report for property DY-13315, dated 27 February 2026. 6 pages, complete. Signed by the loss adjuster.", "Council flood warning notice for property DY-13315, dated 7 March 2026. Single page.", "Flood claim form for property QF-58543, dated 24 March 2026. 5 pages, complete. Signed by the policyholder.", "Debris removal invoice for property DY-13315, dated 25 April 2026. Single page.", "Drying contractor's certificate of completion for property DY-13315, dated 28 March 2026. 2 pages, complete. Signed by the drying contractor."]}}, "question": {"type": "choice", "instructions": "Check whether the pack is complete against the checklist. Go over every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-33", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00062-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ulmvik Inc", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 August 2026"}, "checklist": ["Trip cost estimate, signed.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Flight itinerary quote, issued within the last 1 months.", "Travel request form, signed.", "If the traveller is not a passport holder of the destination country, also: work permit confirmation.", "Visa entry requirement printout, issued within the last 3 months.", "Line manager approval, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter."], "submission": {"case": {"name": "business trip ER-6840", "reference": "NK-56978", "details": ["The traveller is not a passport holder of the destination country.", "The trip involves travel to a country requiring a visa."]}, "cover note": "Dear colleague, this pack was already checked by a colleague of mine before I sent it on. Best regards, Declan Vellstow", "documents received": ["Passport copy for international travel for business trip ER-6840, showing an expiry date of 12 February 2028. Single page.", "Trip cost estimate for business trip ER-6840, dated 11 August 2026. Single page. Signed by the travel coordinator.", "Work permit confirmation for business trip ER-6840, dated 6 May 2026. 2 pages, normal complete.", "Flight itinerary quote for business trip ER-6840, dated 19 August 2026. 2 pages, complete.", "Visa approval letter for business trip ER-6840, dated 11 June 2026. 2 pages, complete.", "Visa entry requirement printout for business trip ER-6840; its date cannot be seen, as it is smudged. 2 pages, complete.", "Line manager approval for business trip ER-6840, dated 16 August 2026. Single page. Signed by the line manager.", "Travel request form for business trip ER-6840, dated 21 June 2026. 2 pages, complete. Signed by the traveller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "expired", "defect": "date not visible", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 893}} {"id": "isc-te-00271-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Ilvhurst SAS", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "23 March 2026"}, "checklist": ["Leaver notification form, signed", "Non-disclosure reminder acknowledgement, signed", "Final payroll cut-off note, signed, issued within the last 1 months", "Service desk ticket closure summary, issued within the last 1 months"], "submission": {"case": {"name": "Declan Vellridge", "reference": "QT-58639"}, "documents received": ["Leaver notification form for Declan Vellridge, issued 30 November 2025. 2 pages, complete. Signed by the line manager.", "Service desk ticket closure summary for Declan Vellridge, issued 9 March 2026. 3 pages, complete.", "Non-disclosure reminder acknowledgement for Declan Vellridge, issued 5 March 2026. Single page. Signed by the departing employee.", "Final payroll cut-off note for Declan Vellridge, issued 10 March 2026. Single page. Signed by the payroll officer.", "Payslip from an earlier month for Declan Vellridge, issued 10 March 2026. Single page. Signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? That is the question to answer. Work through all checklist lines that bear on this case. For a required document to be counted, it must be the kind of document listed on the checklist (a similar document will not suffice), it must be about the case's subject, it must have all its pages present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued inside the period the checklist allows. A conditional line applies only when the circumstance it sets out holds for the case. complete: every applicable line is met, and extra documents are irrelevant. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one line cannot be decided from what is shown, for example when a needed date, signature or page count is not visible, when a document's kind cannot be told, or when the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-54", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 701}} {"id": "isc-te-00253-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Thalmont plc", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "28 July 2026"}, "checklist": ["Cost-benefit justification included.", "If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review.", "Grant fund eligibility note included, issued within the last 6 months, signed.", "Vendor quotation included, issued within the last 3 months.", "If the equipment is above the major purchase threshold, also: tender waiver justification, signed.", "Maintenance plan included."], "submission": {"case": {"name": "equipment ZW-36248", "reference": "IQ-19665", "details": ["The equipment uses no radioactive sources.", "The equipment is below the major purchase threshold."]}, "documents received": ["Cost-benefit justification for equipment ZW-36248, dated 4 June 2026. 3 pages, complete.", "Vendor quotation for equipment ZW-36248, dated 19 June 2026. Only page 1 of 2 is included.", "Grant fund eligibility note for equipment ZW-36248, dated 8 February 2026, 1 page. Signed by the research grants officer.", "Maintenance plan for equipment ZW-36248, dated 15 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "You must decide if the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete when every applicable line is met (extra documents do not matter). Return incomplete when at least one applicable line is not met. Return unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-29", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 701}} {"id": "isc-te-00376-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Dravstead Inc", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "10 September 2026"}, "checklist": ["Obtain the returns policy statement, signed.", "Obtain the anti-money laundering questionnaire, signed.", "Obtain the product catalogue declaration, signed.", "If the seller intends to list food or cosmetic products, also obtain the safety compliance certificate, issued within the last 12 months.", "Obtain the bank account verification letter, issued within the last 3 months and signed.", "Obtain the authorised representative ID copy, valid (not expired) on the date of the review.", "Obtain the business registration certificate."], "submission": {"case": {"name": "Aldston Partners", "reference": "TX-58075", "details": ["The seller intends to list food or cosmetic products."]}, "documents received": ["Aldston_Partners_business_registration_certificate.pdf - Business registration certificate for Aldston Partners, dated 23 July 2026. 1 page.", "Aldston_Partners_returns_policy_statement.pdf - Returns policy statement for Aldston Partners, dated 17 June 2026. 2 pages, complete. Signed by an authorised signatory of Aldston Partners.", "Aldston_Partners_safety_compliance_certificate.pdf - Safety compliance certificate for Aldston Partners, dated 31 May 2026. 2 pages, complete.", "Aldston_Partners_authorised_representative_ID_copy.pdf - Authorised representative ID copy for Aldston Partners, showing an expiry date of 18 January 2029. 1 page.", "Aldston_Partners_bank_account_verification_letter.pdf - Bank account verification letter for Aldston Partners, dated 11 July 2026. 1 page. Signed by a bank officer.", "Aldston_Partners_product_catalogue_declaration.pdf - Product catalogue declaration for Aldston Partners, dated 4 August 2026. 4 pages, complete. Signed by the company's managing director.", "Aldston_Partners_gym_membership_card.pdf - Gym membership card with a photo belonging to Aldston Partners's authorised representative, showing an expiry date of 18 January 2029. 1 page.", "Aldston_Partners_anti_money_laundering_questionnaire.pdf - Anti-money laundering questionnaire for Aldston Partners, dated 17 August 2026. 3 pages, complete. Signed by the company's compliance officer."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; base your judgement on the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-42", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 923}} {"id": "isc-te-00168-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Esklock Group", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "9 April 2026"}, "checklist": ["Go-live sign-off certificate, issued within the last 1 months, signed.", "Payment gateway technical specification.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review.", "Penetration test summary, issued within the last 6 months, signed.", "Fraud screening configuration sheet, signed."], "submission": {"case": {"name": "payment gateway UC-28398", "reference": "VH-98812", "details": ["The gateway will store customers' card details."]}, "cover note": "I have put the pack together as best I could, but I am not sure everything needed is there. Please review it and let me know if anything is missing.", "documents received": ["Fraud screening configuration sheet for payment gateway UC-28398. Date of issue: 28 December 2025. 1 page, signed by the Fraud Screening Analyst.", "Penetration test summary for payment gateway UC-28398. Date of issue: 28 December 2025. 3 pages, complete. Signed by the IT Security Test Lead.", "File name: scan0417.pdf. The file will not open, so its contents cannot be seen.", "Card storage compliance certificate for payment gateway UC-28398. Expiry date: 17 July 2027. 2 pages, complete.", "Payment gateway technical specification for payment gateway UC-28398. Date of issue: 27 March 2026. 8 pages, complete.", "Go-live sign-off certificate for payment gateway UC-28398. Date of issue: 5 April 2026. 1 page, signed by the Head of Payments Operations."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 812}} {"id": "isc-te-00203-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Marlfell Limited", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "22 May 2026"}, "checklist": ["If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Photographs of the fault, issued within the last 3 months.", "Access authorisation slip, signed.", "Location details sheet.", "Parts order confirmation, issued within the last 1 months.", "Job request form, signed.", "Cost estimate, issued within the last 3 months and signed."], "submission": {"case": {"name": "maintenance request WG-2235", "reference": "JG-32987", "details": ["The job involves no work at height above two metres."]}, "documents received": ["Planned completion date sheet, maintenance request WG-2235. Date of issue: 26 March 2026. Single page. Signed by the facilities coordinator.", "Cost estimate, maintenance request WG-2235. Date of issue: 29 April 2026. 2 pages, complete. Signed by the estimating supervisor.", "Job request form, maintenance request WG-2235. Date of issue: 30 April 2026. Single page. Signed by the requesting manager.", "Access authorisation slip, maintenance request WG-2235. Date of issue: 1 May 2026. Single page. Signed by the site access controller.", "Location details sheet, maintenance request WG-2235. Date of issue: 29 April 2026. Single page.", "Photographs of the fault, maintenance request WG-2235. Date of issue: 10 May 2026. Pages 1-1 of 2 are included; page 2 is not in the pack.", "Parts order confirmation, maintenance request WG-2235. Date of issue: 13 May 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "pages missing", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 828}} {"id": "isc-te-00395-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Creskwater Ltd", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "16 September 2026"}, "checklist": ["Default notice previously served, issued within the last 6 months, signed.", "If the defaulting party is a public sector body, also: public sector termination approvals record, issued within the last 3 months, signed.", "Losses calculation statement, issued within the last 1 months, signed.", "Termination clause legal opinion, issued within the last 1 months, signed.", "Termination notice draft, signed.", "Original service agreement copy.", "Cure period expiry calculation, issued within the last 1 months, signed."], "submission": {"case": {"name": "Kaldbury GmbH", "reference": "XV-18490", "details": ["The defaulting party is a private company."]}, "cover note": "I am sorry that this pack was put together in a rush ahead of today's review. Please let me know if anything is unclear and I will follow up quickly.", "documents received": ["Termination clause legal opinion - Kaldbury GmbH.pdf. This is the termination clause legal opinion about Kaldbury GmbH, dated 8 September 2026. It is 5 pages, complete, and signed by external counsel.", "Original service agreement copy - Kaldbury GmbH.pdf. This is the original service agreement copy about Kaldbury GmbH, dated 9 June 2026. It is 10 pages, complete.", "Default notice - Kaldbury GmbH.pdf. This is the default notice previously served about Kaldbury GmbH, dated 8 June 2026, a single page, signed by the contract manager.", "Losses calculation statement - Kaldbury GmbH.pdf. This is the losses calculation statement about Kaldbury GmbH, dated 26 August 2026. It is 3 pages, complete, and signed by the finance director.", "Termination notice draft - Kaldbury GmbH.pdf. This is the termination notice draft about Kaldbury GmbH, dated 13 July 2026. It is 2 pages, complete, and signed by the head of legal.", "Cure period expiry calculation - Kaldbury GmbH.pdf. This is the cure period expiry calculation about Kaldbury GmbH, dated 14 September 2026. It is 2 pages, complete, and signed by the contract manager."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Work through every checklist line that applies to this case one by one. For a required document to count, it must be the exact kind of document listed (not a similar one), be about the subject of the case, contain all its pages, be signed where the checklist asks for a signature, not have expired on the review date, and have been issued within the period the checklist allows. A conditional line only applies when its circumstance holds for the case. complete: all applicable lines are met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-68", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 909}} {"id": "isc-te-00468-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Pellstow LLP", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "17 July 2026"}, "checklist": ["Prerequisite certificate", "Delegate photo identification, valid (not expired) on the date of the review", "Special requirements note", "Employer sponsorship letter, issued within the last 3 months, signed"], "submission": {"case": {"name": "course booking KO-47091", "reference": "MS-23733"}, "documents received": ["Payment confirmation for course booking KO-47091. Date of issue: 25 June 2026. Single page.", "Delegate photo identification for course booking KO-47091. Expiry date: 12 May 2028. Single page.", "Special requirements note for course booking KO-47091. Date of issue: 3 June 2026. Single page.", "Employer sponsorship letter for course booking KO-47091. Date of issue: 4 June 2026. Single page. The signature line is empty: the letter is not signed.", "Prerequisite certificate for course booking KO-47091. Date of issue: 22 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack is complete per the checklist. Go over every checklist line that applies to this case. Only a document of the listed kind counts (not a similar one), and it must be about the case's subject, have all its pages, be signed wherever the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: at least one applicable line is not satisfied. unclear: no line is clearly not met, but at least one cannot be decided from what is shown, for instance a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-9", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 668}} {"id": "isc-te-00292-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Elvcombe Group", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "17 June 2026"}, "checklist": ["Furniture inventory list, issued within the last 1 months and signed", "Movers insurance certificate, valid (not expired) on the date of the review", "If the move includes taking furniture to a storage unit, also: storage unit access authorisation, signed", "Signed move plan", "New floor snagging list, issued within the last 1 months and signed", "Parking bay suspension approval, issued within the last 1 months and signed", "Lifting equipment inspection report, issued within the last 6 months and signed"], "submission": {"case": {"name": "office move project BE-20815", "reference": "GI-40044", "details": ["The move includes taking furniture to a storage unit."]}, "cover note": "Sorry, this pack was put together in a bit of a rush. Please let me know if anything needs a second look.", "documents received": ["movers-insurance-BE-20815.pdf - Movers insurance certificate for office move project BE-20815. Shows an expiry date of 24 September 2027. Single page.", "furniture-inventory-BE-20815.pdf - Furniture inventory list for office move project BE-20815, dated 28 May 2026. 4 pages, complete. Signed by the facilities manager.", "storage-access-BE-20815.pdf - Storage unit access authorisation for office move project BE-20815, dated 5 June 2026. Single page. Signed by the storage unit site manager.", "parking-suspension-BE-20815.pdf - Parking bay suspension approval for office move project BE-20815, dated 9 June 2026. Single page. Signed by the local highways authority officer.", "lifting-inspection-BE-20815.pdf - Lifting equipment inspection report for office move project BE-20815, dated 21 March 2026. 2 pages, complete. Signed by the lifting equipment inspector.", "move-plan-BE-20815.pdf - Signed move plan for office move project BE-20815, dated 10 April 2026. 6 pages, complete. Signed by the move project manager.", "snagging-list-BE-20815-30-05-26.pdf - New floor snagging list for office move project BE-20815, dated 30 May 2026. 3 pages, complete. Signed by the new floor site manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 991}} {"id": "isc-te-00082-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Larvcourt Inc", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "29 July 2026"}, "checklist": ["Localisation completeness report, issued within the last 1 month", "If the mobile app release includes third-party analytics, also: analytics data consent statement, issued within the last 3 months and signed", "Marketing screenshot pack", "Privacy policy update, issued within the last 3 months", "If the mobile app release adds a new payment feature, also: payment provider compliance checklist, issued within the last 3 months and signed", "Store listing description, issued within the last 1 month", "Age rating questionnaire, signed"], "submission": {"case": {"name": "mobile app release GK-81797", "reference": "ZI-76687", "details": ["The mobile app release includes third-party analytics.", "The mobile app release adds a new payment feature."]}, "documents received": ["store-listing-description-GK-81797.pdf — Store listing description for mobile app release GK-81797. It shows its date of issue as 15 July 2026. It is 1 page.", "release-notes-GK-81797.pdf — Release notes for mobile app release GK-81797. It shows its date of issue as 17 July 2026. 2 pages, complete.", "privacy-policy-update-GK-81797.pdf — Privacy policy update for mobile app release GK-81797. The date of issue is smudged and cannot be read. 2 pages, complete.", "analytics-data-consent-statement-GK-81797.pdf — Analytics data consent statement for mobile app release GK-81797. It shows its date of issue as 29 June 2026. It is 1 page, signed by the Data Protection Officer.", "localisation-completeness-report-GK-81797.pdf — Localisation completeness report for mobile app release GK-81797. It shows its date of issue as 23 July 2026. 2 pages, complete.", "payment-provider-compliance-checklist-GK-81797.pdf — Payment provider compliance checklist for mobile app release GK-81797. It shows its date of issue as 4 July 2026. 3 pages, complete, signed by the Payments Lead.", "marketing-screenshot-pack-GK-81797.pdf — Marketing screenshot pack for mobile app release GK-81797. It shows its date of issue as 31 May 2026. 6 pages, complete.", "age-rating-questionnaire-GK-81797.pdf — Age rating questionnaire for mobile app release GK-81797. It shows its date of issue as 17 April 2026. 2 pages, complete, signed by the Mobile Release Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "expired", "defect": "date not visible", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1038}} {"id": "isc-te-00435-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Eskcourt SAS", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "5 March 2026"}, "checklist": ["Confirm the complaint category code sheet is present.", "If the complaint alleges a member of staff behaved rudely, also confirm the staff member written response (signed) is present.", "Confirm the original complaint record is present and was issued within the last 6 months.", "Confirm the policy breach summary is present, was issued within the last 3 months, and is signed.", "Confirm the proposed resolution letter draft is present and is signed.", "Confirm the store incident report is present, was issued within the last 3 months, and is signed.", "Confirm the goodwill gesture approval note is present, was issued within the last 1 months, and is signed."], "submission": {"case": {"name": "escalated complaint AZ-62550", "reference": "RC-36204", "details": ["The complaint alleges a member of staff behaved rudely."]}, "cover note": "Please review the pack before we send the formal response. I am not sure everything needed is there, so please check it over before it goes out.", "documents received": ["Store incident report, escalated complaint AZ-62550. Date of issue: 22 February 2026. 2 pages, complete. Signed by the duty store manager.", "Proposed resolution letter draft, escalated complaint AZ-62550. Date of issue: 24 December 2025. 2 pages, complete. Signed by the customer relations manager.", "Staff member written response, escalated complaint AZ-62550. Date of issue: 2 February 2026. 1 page. Signed by the staff member.", "Original complaint record, escalated complaint AZ-62550. Date of issue: 22 October 2025. 2 pages, complete.", "Policy breach summary, escalated complaint AZ-62550. Date of issue: 18 February 2026. 2 pages, complete. Signed by the store manager.", "Complaint category code sheet, escalated complaint AZ-62550. Date of issue: 20 February 2026. 1 page.", "Goodwill gesture approval note, escalated complaint AZ-62550. Date of issue: 26 February 2026. 1 page. Signed by the head of customer relations."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 922}} {"id": "isc-te-00037-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Stervdale BV", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "5 May 2026"}, "checklist": ["Fit-out cost estimate, issued within the last 6 months and signed", "Pilot operation audit report, issued within the last 6 months and signed", "If the franchisee intends to operate through a company rather than as an individual, also: shareholder agreement extract, signed", "Operator licence, valid (not expired) on the date of the review", "If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement, valid (not expired) on the date of the review and signed", "Franchise application form, signed"], "submission": {"case": {"name": "Yarvcourt LLP", "reference": "AE-94886", "details": ["The franchisee intends to operate through a company rather than as an individual.", "The franchise territory does not include premises in a shopping centre."]}, "documents received": ["Franchise application form - Yarvcourt LLP.pdf. A franchise application form for Yarvcourt LLP, dated 22 January 2026. 3 pages, complete. Signed by a partner of Yarvcourt LLP.", "Training course completion certificate - Yarvcourt LLP.pdf. A training course completion certificate for Yarvcourt LLP, dated 7 February 2026. Single page.", "Shareholder agreement extract - Yarvcourt LLP.pdf. A shareholder agreement extract for Yarvcourt LLP, dated 29 January 2026. 4 pages, complete. Signed by a director of Yarvcourt LLP.", "Pilot operation audit report - Yarvcourt LLP.pdf. A pilot operation audit report for Yarvcourt LLP, dated 3 January 2026. 8 pages, complete. Signed by the pilot operation auditor.", "Operator licence - Yarvcourt LLP.pdf. An operator licence for Yarvcourt LLP, with an expiry date of 10 December 2027. 2 pages, complete.", "Funding agreement - Yarvcourt LLP.pdf. A funding agreement from a lender for Yarvcourt LLP, dated 15 February 2026. 6 pages, complete. Signed by the lender's loans officer.", "Fit-out cost estimate - Yarvcourt LLP.pdf. A fit-out cost estimate for Yarvcourt LLP, dated 28 October 2025. 4 pages, complete. Signed by the franchisor's fit-out manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 920}} {"id": "isc-te-00109-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Veymere SAS", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "14 April 2026"}, "checklist": ["If the seller intends to list food or cosmetic products, also provide: safety compliance certificate (issued within the last 12 months)", "proof of trading address (issued within the last 3 months)", "product catalogue declaration (signed)", "authorised representative ID copy (valid (not expired) on the date of the review)", "business registration certificate", "returns policy statement (signed)"], "submission": {"case": {"name": "Ulmmore Ltd", "reference": "UN-41460", "details": ["The seller intends to list food or cosmetic products."]}, "documents received": ["Business registration certificate - Ulmmore Ltd.pdf. A business registration certificate for Ulmmore Ltd, dated 1 March 2026. Single page.", "Anti-money laundering questionnaire - Ulmmore Ltd.pdf. An anti-money laundering questionnaire for Ulmmore Ltd, dated 20 February 2026. 3 pages, complete. Signed by the finance director.", "Bank account verification letter - Ulmmore Ltd.pdf. A bank account verification letter for Ulmmore Ltd, dated 14 March 2026. Single page. Signed by the bank's account manager.", "Returns policy statement - Ulmmore Ltd.pdf. A returns policy statement for Ulmmore Ltd, dated 27 February 2026. 2 pages, complete. Signed by the operations manager.", "Proof of trading address - Ulmmore Ltd.pdf. A proof of trading address for Ulmmore Ltd, dated 16 February 2026. Single page.", "Safety compliance certificate - Ulmmore Ltd.pdf. A safety compliance certificate for Ulmmore Ltd, dated 11 May 2025. 2 pages, complete.", "Product catalogue declaration - Ulmmore Ltd.pdf. A product catalogue declaration for Ulmmore Ltd, dated 19 March 2026. 4 pages, complete. Signed by the managing director.", "Authorised representative ID copy - Ulmmore Ltd.pdf. An authorised representative ID copy for Ulmmore Ltd showing an expiry date of 12 July 2027. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 873}} {"id": "isc-te-00489-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Raskwell SAS", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "8 May 2026"}, "checklist": ["Check for a signed franchise agreement counterpart.", "Check for a pilot operation audit report, issued within the last 6 months and signed.", "If the franchisee intends to operate through a company rather than as an individual, also check for a shareholder agreement extract, signed.", "Check for a training course completion certificate, issued within the last 12 months.", "Check for a franchise application form, signed."], "submission": {"case": {"name": "Prydthorpe Ltd", "reference": "GS-36628", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "documents received": ["Funding agreement from a lender for Prydthorpe Ltd, dated 20 March 2026. 6 pages, complete. Signed by the lender's authorised signatory.", "Franchise application form for Prydthorpe Ltd, dated 13 March 2026. 3 pages, complete. Signed by the franchisee's director.", "Training course completion certificate for Prydthorpe Ltd, dated 12 April 2026. Single page.", "Pilot operation audit report on Prydthorpe Ltd, dated 23 March 2026. 8 pages, complete. Signed by the auditor.", "Signed franchise agreement counterpart for Prydthorpe Ltd, dated 15 February 2026. 12 pages, complete. Signed by the franchisor's authorised representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 741}} {"id": "isc-te-00350-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Pravfell plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "19 August 2026"}, "checklist": ["Check the remediation items list, issued within the last 3 months, signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months, signed.", "Check the follow-up owner assignment sheet, issued within the last 3 months, signed.", "Check the postmortem meeting minutes, issued within the last 3 months, signed.", "Check the customer impact statement, issued within the last 3 months.", "If the incident involved a data leak to an outside party, also: data breach notification record, issued within the last 3 months, signed.", "Check the incident timeline, issued within the last 3 months."], "submission": {"case": {"name": "production incident ZQ-13927", "reference": "EV-82488", "details": ["The incident was caused entirely by internal systems.", "The incident involved a data leak to an outside party."]}, "documents received": ["Incident timeline for production incident ZQ-13927, issued 22 June 2026, 3 pages, complete.", "Service level objective breach record for production incident ZQ-13927, issued 28 July 2026, single page.", "Data breach notification record for production incident ZQ-13927, issued 20 July 2026, 2 pages, complete, signed by the data protection officer.", "Customer impact statement for production incident ZQ-13927, issued 9 July 2026, 2 pages, complete.", "Follow-up owner assignment sheet for production incident ZQ-13927, issued 28 July 2026, single page, signed by the reliability engineering lead.", "Remediation items list for production incident ZQ-13927, issued 10 June 2026, 2 pages, complete, signed by the incident remediation lead.", "Postmortem meeting minutes for production incident ZQ-13927, issued 25 June 2026, 3 pages, complete, signed by the postmortem chair."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-65", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00034-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Kenvstow GmbH", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "2 March 2026"}, "checklist": ["Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "If the flood water reached the upper floor of the property, also: upper floor damage schedule, signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Council flood warning notice, issued within the last 12 months", "Loss adjuster's inspection report, issued within the last 6 months, signed", "Buildings insurance policy schedule", "Debris removal invoice, issued within the last 6 months"], "submission": {"case": {"name": "property EP-34443", "reference": "ES-19965", "details": ["The flood water reached the upper floor of the property."]}, "cover note": "This pack was already checked by a colleague. Kind regards, Mert Nebbmore", "documents received": ["Council flood warning notice about property EP-34443. Dated 2 November 2025. 1 page.", "Loss adjuster's inspection report about property EP-34443. Dated 14 February 2026. 6 pages, complete. Signed by the loss adjuster.", "Utility supplier's letter confirming the supply was cut off about property EP-34443. Dated 25 March 2025. 1 page.", "Drying contractor's certificate of completion about property EP-34443. Dated 30 September 2025. 2 pages, complete. Signed by the drying contractor.", "Photographs of flood water in the rooms about property EP-34443. Dated 23 February 2026. 3 pages, complete.", "Debris removal invoice about property EP-34443. Dated 27 December 2025. 1 page.", "Flood claim form about property EP-34443. Dated 2 December 2025. 5 pages, complete. Signed by the policyholder.", "Buildings insurance policy schedule about property EP-34443. Dated 30 November 2025. 5 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 898}} {"id": "isc-te-00225-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Haskmark Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "29 July 2026"}, "checklist": ["Certified quality management system certificate, valid (not expired) on the date of the review.", "Supplier corrective action plan, issued within the last 6 months and signed.", "Supplier audit report, issued within the last 24 months and signed.", "Supplier quality questionnaire, issued within the last 12 months and signed.", "Raw material certificate of analysis, issued within the last 6 months and signed."], "submission": {"case": {"name": "Jaskfield LLP", "reference": "PX-41794"}, "documents received": ["Raw material certificate of analysis for Jaskfield LLP, dated 26 March 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Supplier audit report for Jaskfield LLP, dated 28 July 2025. 8 pages, complete. Signed by the lead auditor.", "Supplier corrective action plan for Jaskfield LLP, dated 1 March 2026. 3 pages, complete. Signed by the supplier's quality manager.", "Certified quality management system certificate for Jaskfield LLP, showing an expiry date of 29 November 2028. Single page.", "File: scan_20260729_0007.pdf. The scan is too faint to read and the contents cannot be seen.", "Supplier quality questionnaire for Jaskfield LLP, dated 16 July 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Supplier capacity declaration for Jaskfield LLP, dated 16 July 2026. 2 pages, complete. Signed by the supplier's operations director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 775}} {"id": "isc-te-00068-p5-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Halvby LLP", "reviewer": "the adult social care assessment team", "pack": "adult social care needs assessment file", "purpose": "to decide whether the adult is eligible for care and support", "date of the review": "6 April 2026"}, "checklist": ["Safeguarding referral form, issued within the last 12 months, signed", "Needs assessment report, signed", "Support plan, signed", "Financial assessment form, signed", "Recent bank statements, issued within the last 3 months", "Proof of identity, valid (not expired) on the date of the review"], "submission": {"case": {"name": "Vikram Nebbberg", "reference": "VI-15919"}, "documents received": ["Financial assessment form for Vikram Nebbberg. Date of issue: 3 January 2026. 6 pages, complete. Signed by the financial assessment officer.", "Proof of identity for Vikram Nebbberg. Expiry date: 31 October 2027. Single page.", "Support plan for Vikram Nebbberg. Date of issue: 26 January 2026. 6 pages, complete. Signed by the care coordinator.", "Safeguarding referral form for Vikram Nebbberg. Date of issue: 22 December 2025. 2 pages, complete. The signature line is empty: the form is not signed.", "Recent bank statements for Vikram Nebbberg. Date of issue: 15 February 2026. 8 pages, complete.", "Needs assessment report for Vikram Nebbberg. Date of issue: 4 February 2026. 12 pages, complete. Signed by the lead assessor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "adult social care needs assessment file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00293-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Glenford GmbH", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "14 April 2026"}, "checklist": ["If the job involves working at height above 2 metres, also: permit to work at height (issued within the last 1 months, signed)", "If the job will take place in an occupied office, also: occupier notification letter (issued within the last 1 months, signed)", "access authorisation slip (signed)", "cost estimate (issued within the last 3 months, signed)", "location details sheet", "photographs of the fault (issued within the last 3 months)"], "submission": {"case": {"name": "maintenance request JO-3858", "reference": "WB-64559", "details": ["The job involves working at height above two metres.", "The job will take place in an occupied office."]}, "documents received": ["Access authorisation slip. The slip relates to maintenance request JO-3858 and shows its date of issue as 2 January 2026. It is 1 page and carries the signature of the site access controller.", "Location details sheet. The sheet covers maintenance request JO-3858 and shows its date of issue as 5 February 2026. It is 1 page.", "Planned completion date sheet. The sheet is for maintenance request JO-3858 and shows its date of issue as 18 February 2026. It is 1 page and is signed by the job scheduler.", "Cost estimate. The estimate is for maintenance request JO-3858 and shows its date of issue as 29 January 2026. It is 2 pages, complete, and is signed by the estimating surveyor.", "Occupier notification letter. The letter concerns maintenance request JO-3858 and shows its date of issue as 6 April 2026. It is 1 page and is signed by the facilities coordinator.", "Photographs of the fault. The photographs relate to maintenance request JO-3858 and show their date of issue as 25 March 2026. Pages 1-1 of 2 are included.", "Permit to work at height. The permit relates to maintenance request JO-3858 and shows its date of issue as 2 April 2026. It is 1 page and carries the signature of the authorising manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 911}} {"id": "isc-te-00220-p2-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Vaskheim plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "29 June 2026"}, "checklist": ["Company registration certificate on file.", "Bank reference letter on file, issued within the last 6 months and signed.", "Credit limit approval memo on file, issued within the last 1 months and signed.", "Credit reference agency report on file, issued within the last 3 months.", "Signed credit terms agreement on file, signed."], "submission": {"case": {"name": "Tondston Group", "reference": "EP-62790"}, "documents received": ["credit-reference-agency-report.pdf - Credit reference agency report for Tondston Tondston Group. Date of issue: 31 May 2026. 6 pages, complete.", "bank-reference-letter.pdf - Bank reference letter for Tondston Group. Date of issue: 10 January 2026. Single page, signed by the bank manager.", "credit-limit-approval-memo.pdf - Credit limit approval memo for Tondston Group. Date of issue: 13 June 2026. Single page, signed by the finance director.", "signed-credit-terms-agreement.pdf - Signed credit terms agreement for Tondston Group. Date of issue: 5 June 2026. 4 pages, complete, signed by the finance director.", "personal-guarantee.pdf - Personal guarantee for Tondston Group. Date of issue: 28 March 2026. 2 pages, complete, signed by the guarantor.", "company-registration-certificate.pdf - Company registration certificate for Tondston Group. Date of issue: 27 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 571}} {"id": "isc-te-00027-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Nordlock BV", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "29 June 2026"}, "checklist": ["Check the line manager opinion note: it must have been issued within the last 2 months and be signed.", "Check the impact assessment on the team: it must be signed.", "Check the previous flexible working requests record: it must have been issued within the last 24 months.", "Check the current working pattern statement: it must have been issued within the last 3 months.", "Check the flexible working request form: it must be signed.", "Check the client or service impact statement: it must be signed."], "submission": {"case": {"name": "Folake Nebbski", "reference": "EQ-64109"}, "documents received": ["Flexible working request form about Folake Nebbski. It shows its date of issue as 14 June 2026, and it is signed by Folake Nebbski. 3 pages, complete.", "Line manager opinion note about Folake Nebbski. It shows its date of issue as 2 June 2026, and it is signed by the line manager. 2 pages, complete.", "Proposed working pattern plan about Folake Nebbski. It shows its date of issue as 14 March 2026, and it is signed by Folake Nebbski. 2 pages, complete.", "Previous flexible working requests record about Folake Nebbski. The date on it is smudged and cannot be read. It is 1 page.", "Client or service impact statement about Folake Nebbski. It shows its date of issue as 7 April 2026, and it is signed by the line manager. It is 1 page.", "Current working pattern statement about Folake Nebbski. It shows its date of issue as 2 May 2026. It is 1 page.", "Impact assessment on the team about Folake Nebbski. It shows its date of issue as 29 May 2026, and it is signed by the line manager. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 846}} {"id": "isc-te-00379-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Eskhall SAS", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "8 July 2026"}, "checklist": ["If the seller intends to list food or cosmetic products, also include: safety compliance certificate (issued within the last 12 months)", "Include: proof of trading address (issued within the last 3 months)", "Include: tax registration letter", "Include: bank account verification letter (issued within the last 3 months, signed)", "Include: anti-money laundering questionnaire (signed)", "Include: business registration certificate", "Include: authorised representative ID copy (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Hondhall plc", "reference": "TW-57851"}, "documents received": ["Business registration certificate – Hondhall plc. Date of issue: 28 April 2026. 1 page.", "Proof of trading address – Hondhall plc. Date of issue: 30 May 2026. 1 page.", "Anti-money laundering questionnaire – Hondhall plc. Date of issue: 23 March 2026. 3 pages, complete. Signed by the company's compliance officer.", "Tax registration letter – Hondhall plc. Date of issue: 12 May 2026. 1 page.", "Bank account verification letter – Hondhall plc. Date of issue: 17 May 2026. 1 page. Signed by the bank's account manager.", "Authorised representative ID copy – Hondhall plc. Expiry date: 18 December 2028. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 739}} {"id": "isc-te-00191-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Creskley Partners", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "13 August 2026"}, "checklist": ["Obtain a shareholder register extract issued within the last 3 months.", "Obtain a certificate of incorporation.", "Obtain a company tax registration certificate.", "Obtain signed company statutes.", "Obtain proof of registered office address issued within the last 3 months.", "Obtain an authorised signer identity document that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "Yarvholm & Co", "reference": "LC-68396"}, "documents received": ["CompanyStatutes_YarvholmCo_04052026.pdf - Company statutes for Yarvholm & Co. It shows a date of issue of 4 May 2026. 12 pages, complete. The statutes are signed by the company's legal representative.", "ShareholderRegisterExtract_YarvholmCo_10072026.pdf - Shareholder register extract for Yarvholm & Co. It shows a date of issue of 10 July 2026. 2 pages, complete.", "CompanyTaxRegistrationCertificate_YarvholmCo_08082026.pdf - Company tax registration certificate for Yarvholm & Co. It shows a date of issue of 8 August 2026. Single page.", "File_20260813_01.pdf - The file will not open, so its contents cannot be seen.", "CertificateOfIncorporation_YarvholmCo_15072026.pdf - Certificate of incorporation for Yarvholm & Co. It shows a date of issue of 15 July 2026. Single page.", "AuthorisedSignerID_YarvholmCo_25062028.pdf - Authorised signer identity document for Yarvholm & Co. It shows an expiry date of 25 June 2028. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 832}} {"id": "isc-te-00100-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Elvwell Group", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "23 April 2026"}, "checklist": ["Bank statement (issued within the last 3 months)", "If the property is a new build, also: new build warranty certificate", "Sale and purchase agreement (signed)", "Property valuation report (issued within the last 6 months, signed)", "Proof of deposit (issued within the last 3 months)", "Mortgage application form (signed)"], "submission": {"case": {"name": "property NL-32293", "reference": "OP-43626", "details": ["The property is a new build."]}, "documents received": ["Property_valuation_report_NL-32293.pdf - Property valuation report for property NL-32293. Date of issue: 8 December 2025. 10 pages, complete. Signed by the valuer.", "New_build_warranty_certificate_NL-32293.pdf - New build warranty certificate for property NL-32293. Date of issue: 1 February 2026. 3 pages, complete.", "Proof_of_deposit_NL-32293.pdf - Proof of deposit for property NL-32293. Date of issue: 23 February 2026. 1 page.", "Mortgage_application_form_NL-32293.pdf - Mortgage application form for property NL-32293. Date of issue: 10 March 2026. 6 pages, complete. Signed by the applicant.", "Photo_identity_document_NL-32293.pdf - Photo identity document for property NL-32293. Expiry date: 15 August 2026. 1 page.", "Sale_and_purchase_agreement_NL-32293.pdf - Sale and purchase agreement for property NL-32293. Date of issue: 9 January 2026. 9 pages, complete. Signed by the buyer and the seller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00062-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ulmvik Inc", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "26 August 2026"}, "checklist": ["Trip cost estimate, signed.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Flight itinerary quote, issued within the last 1 months.", "Travel request form, signed.", "If the traveller is not a passport holder of the destination country, also: work permit confirmation.", "Visa entry requirement printout, issued within the last 3 months.", "Line manager approval, signed.", "If the trip involves travel to a country requiring a visa, also: visa approval letter."], "submission": {"case": {"name": "business trip ER-6840", "reference": "NK-56978", "details": ["The traveller is not a passport holder of the destination country.", "The trip involves travel to a country requiring a visa."]}, "documents received": ["Work permit confirmation for business trip ER-6840, dated 6 May 2026. 2 pages, normal complete.", "Visa approval letter for business trip ER-6840, dated 11 June 2026. 2 pages, complete.", "Visa entry requirement printout for business trip ER-6840, dated 19 June 2025. 2 pages, complete.", "Flight itinerary quote for business trip ER-6840, dated 19 August 2026. 2 pages, complete.", "Passport copy for international travel for business trip ER-6840, showing an expiry date of 12 February 2028. Single page.", "Trip cost estimate for business trip ER-6840, dated 11 August 2026. Single page. Signed by the travel coordinator.", "Travel request form for business trip ER-6840, dated 21 June 2026. 2 pages, complete. Signed by the traveller.", "Line manager approval for business trip ER-6840, dated 16 August 2026. Single page. Signed by the line manager."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 668}} {"id": "isc-te-00120-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Morvholm Group", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "3 March 2026"}, "checklist": ["Obtain the equipment breakdown claim form, signed.", "Obtain the photographs of the failed component.", "Obtain the machine maintenance log, issued within the last 6 months.", "Obtain the repair or replacement quotation, issued within the last 3 months.", "Obtain the purchase invoice for the machine.", "Obtain the production downtime log, issued within the last 3 months and signed."], "submission": {"case": {"name": "failed machine WJ-98667", "reference": "SK-93016"}, "documents received": ["machine_maintenance_log_WJ-98667.pdf — Machine maintenance log for failed machine WJ-98667, dated 8 December 2025. 5 pages, complete.", "production_downtime_log_WJ-98667.pdf — Production downtime log for failed machine WJ-98667, dated 8 January 2026. It is signed by the production manager. 2 pages, complete.", "equipment_breakdown_claim_form_WJ-98667.pdf — Equipment breakdown claim form for failed machine WJ-98667, dated 4 November 2025. It is signed by the policyholder's claims representative. 3 pages, complete.", "repair_replacement_quotation_WJ-98667.pdf — Repair or replacement quotation for failed machine WJ-98667, dated 17 December 2025. 2 pages, complete.", "purchase_invoice_machine_WJ-98667.pdf — Purchase invoice for the machine, covering failed machine WJ-98667, dated 11 November 2025. It is a single page.", "photographs_failed_component_WJ-98667.pdf — Photographs of the failed component for failed machine WJ-98667, dated 5 November 2025. 2 pages, complete."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 654}} {"id": "isc-te-00168-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Esklock Group", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "9 April 2026"}, "checklist": ["Go-live sign-off certificate, issued within the last 1 months, signed.", "Payment gateway technical specification.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review.", "Penetration test summary, issued within the last 6 months, signed.", "Fraud screening configuration sheet, signed."], "submission": {"case": {"name": "payment gateway UC-28398", "reference": "VH-98812", "details": ["The gateway will store customers' card details."]}, "documents received": ["Card storage compliance certificate for payment gateway UC-28398. Expiry date: 17 July 2027. 2 pages, complete.", "Penetration test summary for payment gateway UC-28398. Date of issue: 28 December 2025. 3 pages, complete. Signed by the IT Security Test Lead.", "Go-live sign-off certificate for payment gateway UC-28398. Date of issue: 5 April 2026. 1 page, signed by the Head of Payments Operations.", "Fraud screening configuration sheet for payment gateway UC-28398. Date of issue: 28 December 2025. 1 page, signed by the Fraud Screening Analyst.", "Payment gateway technical specification for payment gateway UC-28398. Date of issue: 27 March 2026. Pages 1 to 7 of 8 are included."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "pages missing", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 756}} {"id": "isc-te-00274-p2-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Vasklund GmbH", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "19 June 2026"}, "checklist": ["Asset register update, issued within the last 1 months", "Data wipe certificate, issued within the last 3 months, signed", "Final backup confirmation, issued within the last 3 months, signed", "Data migration confirmation, issued within the last 3 months, signed", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed", "Licence reassignment note, issued within the last 3 months, signed"], "submission": {"case": {"name": "retired server PX-71814", "reference": "WW-93737", "details": ["The server holds no records with retention requirements."]}, "cover note": "I am not sure everything needed is in this pack, so please take a careful look.", "documents received": ["Data wipe certificate for retired server PX-71814, dated 12 May 2026, 1 page, signed by the data sanitisation technician.", "Data migration confirmation for retired server PX-71814, dated 16 April 2026, 2 pages, complete, signed by the migration lead.", "Final backup confirmation for retired server PX-71814, dated 27 April 2026, 1 page, signed by the backup administrator.", "Network disconnection confirmation for retired server PX-71814, dated 13 June 2026, 1 page, signed by the network administrator.", "Asset register update for retired server PX-71814, dated 29 May 2026, 1 page.", "Licence reassignment note for retired server PX-71814, dated 1 April 2026, 1 page, signed by the licence manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 814}} {"id": "isc-te-00349-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Fervvik Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "17 July 2026"}, "checklist": ["Nominated store preference form, signed", "Terms and conditions acceptance sheet, signed", "Initial points balance statement, issued within the last 3 months", "Identity verification document, valid (not expired) on the date of the review", "If the customer is transferring points from a rival scheme, also: points transfer evidence statement, issued within the last 3 months and signed", "Customer contact details sheet, signed"], "submission": {"case": {"name": "Giulia Natell", "reference": "BP-19825"}, "documents received": ["terms_and_conditions_acceptance_sheet_Giulia_Natell.pdf. Terms and conditions acceptance sheet for Giulia Natell, dated 26 June 2026. A single page, signed by Giulia Natell.", "identity_verification_document_Giulia_Natell.pdf. Identity verification document for Giulia Natell, with an expiry date of 10 May 2027. A single page.", "initial_points_balance_statement_Giulia_Natell.pdf. Initial points balance statement for Giulia Natell, dated 11 July 2026. A single page.", "customer_contact_details_sheet_Giulia_Natell.pdf. Customer contact details sheet for Giulia Natell, dated 20 March 2026. A single page, signed by Giulia Natell.", "points_transfer_request_Giulia_Natell.pdf. Points transfer request for Giulia Natell, dated 5 July 2026. A single page, signed by Giulia Natell.", "nominated_store_preference_form_Giulia_Natell.pdf. Nominated store preference form for Giulia Natell, dated 28 June 2026. A single page, signed by Giulia Natell."]}}, "question": {"type": "choice", "instructions": "Your task is to determine whether the pack is complete when measured against the checklist. Go over every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. The answer is complete: every applicable line is met (extra documents do not matter). The answer is incomplete: at least one applicable line is not met. The answer is unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not rely on cover notes and labels, as they may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-16", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 815}} {"id": "isc-te-00198-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Dunddale Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "8 September 2026"}, "checklist": ["Venue access instructions, issued within the last 3 months", "Payment confirmation, issued within the last 3 months", "Cancellation policy acceptance, signed", "Employer sponsorship letter, issued within the last 3 months, signed", "Delegate photo identification, valid (not expired) on the date of the review", "Course booking form, signed"], "submission": {"case": {"name": "course booking BH-46231", "reference": "KS-57829"}, "documents received": ["Delegate photo identification for course booking BH-46231. Expiry date: 12 June 2028. 1 page.", "Employer sponsorship letter for course booking BH-46231. Date of issue: 4 September 2026. 1 page. Signed by the employer.", "Course booking form for course booking BH-46231. Date of issue: 30 June 2026. 2 pages, complete. Signed by the delegate.", "Payment confirmation for course booking BH-46231. Date of issue: 13 August 2026. 1 page.", "Special requirements note for course booking BH-46231. Date of issue: 28 June 2026. 1 page.", "Venue access instructions for course booking BH-46231. Date of issue: 27 July 2026. 1 page.", "Cancellation policy acceptance for course booking BH-46231. Date of issue: 11 August 2026. 1 page. Signed by the delegate."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 774}} {"id": "isc-te-00085-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Marlham GmbH", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "19 May 2026"}, "checklist": ["Driving licence: valid (not expired) on the date of the review, signed", "Additional driver authorisation form: signed", "Passport: valid (not expired) on the date of the review, signed", "Credit card in the driver's name: valid (not expired) on the date of the review, signed", "Vehicle condition report: signed"], "submission": {"case": {"name": "Eoin Thornden", "reference": "KU-86966"}, "cover note": "This pack was already checked by a colleague before it reached me. Please review it at the counter as usual.", "documents received": ["driving_licence_thornden.pdf. Driving licence for Eoin Thornden, expiring 8 August 2027. 2 pages, complete. Signed by the licence holder.", "passport_thornden.pdf. Passport for Eoin Thornden, expiring 24 August 2028. Single page. Signed by the issuing authority.", "insurance_excess_waiver_certificate_thornden.pdf. Insurance excess waiver certificate for Eoin Thornden, expiring 11 November 2027. 2 pages, complete.", "vehicle_condition_report_thornden.pdf. Vehicle condition report for Eoin Thornden, issued 6 May 2026. 2 pages, complete. Signed by the inspecting branch staff member.", "credit_card_thornden.pdf. Credit card in the driver's name for Eoin Thornden, expiring 18 November 2026. Single page. Signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide. Review each checklist line that applies to this case. To count, a required document must be the kind of document listed (not a similar one), must be about the subject of the case, must have all its pages, must be signed where the checklist asks for a signature, must not have expired on the date of the review, and must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Give complete if every applicable line is met (extra documents do not matter). Give incomplete if at least one applicable line is not met. Give unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "variant-25", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 764}} {"id": "isc-te-00346-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Garnford Limited", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "15 September 2026"}, "checklist": ["If the complaint alleges a member of staff behaved rudely, also: staff member written response (signed)", "policy breach summary (issued within the last 3 months, signed)", "proposed resolution letter draft (signed)", "store incident report (issued within the last 3 months, signed)", "complaint escalation form (issued within the last 1 months, signed)", "If the complaint involves a data protection concern, also: data protection impact note (issued within the last 1 months, signed)", "complaint category code sheet"], "submission": {"case": {"name": "escalated complaint HJ-70397", "reference": "FT-75575", "details": ["The complaint makes no allegation about staff behaviour.", "The complaint involves a data protection concern."]}, "documents received": ["complaint_escalation_form_HJ-70397.pdf - A complaint escalation form relating to escalated complaint HJ-70397. Date of issue: 1 September 2026. 2 pages, complete. Signed by the Customer Relations Team Leader.", "returns_policy_HJ-70397.pdf - A copy of the returns policy relating to escalated complaint HJ-70397. Date of issue: 14 July 2026. 2 pages, complete. Signed by the Store Manager.", "proposed_resolution_letter_draft_HJ-70397.pdf - A proposed resolution letter draft relating to escalated complaint HJ-70397. Date of issue: 20 August 2026. 2 pages, complete. Signed by the Head of Customer Relations.", "data_protection_impact_note_HJ-70397.pdf - A data protection impact note relating to escalated complaint HJ-70397. Date of issue: 28 August 2026. 2 pages, complete. Signed by the Data Protection Officer.", "store_incident_report_HJ-70397.pdf - A store incident report relating to escalated complaint HJ-70397. Date of issue: 5 July 2026. 2 pages, complete. Signed by the Duty Store Manager.", "policy_breach_summary_HJ-70397.pdf - A policy breach summary relating to escalated complaint HJ-70397. Date of issue: 14 July 2026. 2 pages, complete. Signed by the Store Manager.", "complaint_category_code_sheet_HJ-70397.pdf - A complaint category code sheet relating to escalated complaint HJ-70397. Date of issue: 1 September 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1002}} {"id": "isc-te-00200-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Nordlock Limited", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "6 March 2026"}, "checklist": ["Furniture inventory list, issued within the last 1 months, signed", "Crate hire agreement, signed", "IT decommissioning certificate, issued within the last 1 months, signed", "Movers insurance certificate, valid (not expired) on the date of the review", "New floor snagging list, issued within the last 1 months, signed", "Signed move plan, signed"], "submission": {"case": {"name": "office move project NC-41124", "reference": "TC-49720"}, "documents received": ["Movers insurance certificate for office move project NC-41124. Expiry date: 14 December 2027. 1 page.", "Crate hire agreement for office move project NC-41124. Date of issue: 4 February 2026. 2 pages, complete. Signed by the crate hire supplier's representative.", "New floor snagging list for office move project NC-41124. Date of issue: 24 February 2026. 3 pages, complete. Signed by the building surveyor.", "Furniture inventory list for office move project NC-41124. Date of issue: 16 February 2026. 4 pages, complete. Signed by the facilities manager.", "Signed move plan for office move project NC-41124. Date of issue: 25 November 2025. 6 pages, complete. Signed by the project manager.", "IT decommissioning certificate for office move project NC-41124. Date of issue: 24 February 2026. 1 page. Signed by the IT services lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 790}} {"id": "isc-te-00272-p4-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Teskham SAS", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "2 June 2026"}, "checklist": ["Access rights inventory, issued within the last 1 month.", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 month, signed.", "Final payroll cut-off note, issued within the last 1 month, signed.", "Line manager confirmation, issued within the last 1 month, signed.", "Non-disclosure reminder acknowledgement, signed.", "Equipment return receipt, issued within the last 1 month, signed.", "If the leaver is moving to a competitor, also: confidential data removal attestation, issued within the last 1 month, signed.", "Service desk ticket closure summary, issued within the last 1 month."], "submission": {"case": {"name": "Francesca Cormmore", "reference": "XV-89813", "details": ["The leaver held no privileged administrator accounts.", "The leaver is moving to a competitor."]}, "documents received": ["non_disclosure_reminder_acknowledgement_cormmore.pdf - Non-disclosure reminder acknowledgement for Francesca Cormmore. Date of issue: 11 February 2026. Single page, signed by the departing employee.", "line_manager_confirmation_cormmore.pdf - Line manager confirmation for Francesca Cormmore. Date of issue: 31 May 2026. Single page, signed by the Line Manager.", "service_desk_ticket_closure_summary_cormmore.pdf - Service desk ticket closure summary for Francesca Cormmore. Date of issue: 30 May 2026. 3 pages, complete.", "access_rights_inventory_cormmore.pdf - Access rights inventory for Francesca Cormmore. Date of issue: 21 May 2026. 4 pages, complete.", "confidential_data_removal_attestation_cormmore.pdf - Confidential data removal attestation for Francesca Cormmore. Date of issue: 25 May 2026. Single page, signed by the Information Security Officer.", "equipment_return_receipt_cormmore_17_apr.pdf - Equipment return receipt for Francesca Cormmore. Date of issue: 17 April 2026. Single page, signed by the IT Asset Coordinator.", "final_payroll_cutoff_note_cormmore.pdf - Final payroll cut-off note for Francesca Cormmore. Date of issue: 31 May 2026. Single page, signed by the Payroll Manager."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide if it is complete. Check every checklist line that is applicable to this case. A required document only counts if it is the kind of document that the checklist lists (not a similar kind), if it is about the subject of the case, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the review date, and if it was issued within the period the checklist allows. A conditional line applies only in cases where its circumstance holds. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves instead.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-56", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 943}} {"id": "isc-te-00457-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Kenvdale BV", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "16 June 2026"}, "checklist": ["If the requested advance is above the standard advance limit, also: finance director approval for the higher advance (signed)", "Travel advance request form (signed)", "Travel policy extract showing advance eligibility", "Costed trip estimate sheet (issued within the last 3 months, signed)", "Line manager approval for the advance (signed)", "Trip itinerary and approval (issued within the last 3 months, signed)", "Payroll deduction agreement for recovery of the advance (signed)"], "submission": {"case": {"name": "Orla Natfield", "reference": "LZ-40963", "details": ["The requested advance is above the standard advance limit."]}, "documents received": ["FD approval higher advance - Orla Natfield - 4 March 2026.pdf. A finance director approval for the higher advance relating to Orla Natfield, dated 4 March 2026. It is 1 page and carries the signature of the finance director.", "Costed trip estimate sheet - Orla Natfield - 22 May 2026.pdf. A costed trip estimate sheet relating to Orla Natfield, dated 22 May 2026. It is 1 page and signed by the employee.", "Travel advance request form - Orla Natfield - 2 May 2026.pdf. A travel advance request form relating to Orla Natfield, dated 2 May 2026. It is 1 page and signed by the employee.", "Outstanding advance clearance check - Orla Natfield - 23 February 2026.pdf. An outstanding advance clearance check relating to Orla Natfield, dated 23 February 2026. It is 1 page and signed by the payroll administrator.", "Payroll deduction agreement - Orla Natfield - 31 May 2026.pdf. A payroll deduction agreement for recovery of the advance relating to Orla Natfield, dated 31 May 2026. It is 1 page and signed by the employee.", "Travel policy extract - Orla Natfield - 28 February 2026.pdf. A travel policy extract showing advance eligibility relating to Orla Natfield, dated 28 February 2026. It is 1 page.", "Employee bank detail confirmation - Orla Natfield - 29 March 2026.pdf. An employee bank detail confirmation relating to Orla Natfield, dated 29 March 2026. It is 1 page and signed by the employee.", "Trip itinerary and approval - Orla Natfield - 5 April 2026.pdf. A trip itinerary and approval relating to Orla Natfield, dated 5 April 2026. It is 2 pages, complete, and signed by the line manager.", "Line manager approval - Orla Natfield - 25 February 2026.pdf. A line manager approval for the advance relating to Orla Natfield, dated 25 February 2026. It is 1 page and signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1093}} {"id": "isc-te-00253-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Thalmont plc", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "28 July 2026"}, "checklist": ["Cost-benefit justification included.", "If the equipment uses radioactive sources, also: radiation licence, valid (not expired) on the date of the review.", "Grant fund eligibility note included, issued within the last 6 months, signed.", "Vendor quotation included, issued within the last 3 months.", "If the equipment is above the major purchase threshold, also: tender waiver justification, signed.", "Maintenance plan included."], "submission": {"case": {"name": "equipment ZW-36248", "reference": "IQ-19665", "details": ["The equipment uses no radioactive sources.", "The equipment is below the major purchase threshold."]}, "cover note": "Please find the approval pack for reference IQ-19665. A colleague has already checked this pack before it was sent on.", "documents received": ["Cost-benefit justification for equipment ZW-36248, dated 4 June 2026. 3 pages, complete.", "Maintenance plan for equipment ZW-36248, dated 15 April 2026. 2 pages, complete.", "Vendor quotation for equipment ZW-36248, dated 19 June 2026. Pages 1 to 2 are included; the total number of pages is not shown anywhere.", "Grant fund eligibility note for equipment ZW-36248, dated 8 February 2026, 1 page. Signed by the research grants officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 6, "n_conditional": 2, "n_documents": 4, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 738}} {"id": "isc-te-00229-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Boltmont Ltd", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "15 May 2026"}, "checklist": ["Audit agenda (signed)", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary (issued within the last 3 months, signed)", "Layout tour plan (signed)", "Document control list (issued within the last 3 months, signed)", "Training matrix extract (issued within the last 3 months, signed)", "Audit scope statement (signed)"], "submission": {"case": {"name": "customer audit visit RD-78940", "reference": "ER-54632"}, "documents received": ["RD-78940_sub-tier_supplier_records_summary.pdf — Sub-tier supplier records summary for customer audit visit RD-78940. Date of issue: 12 March 2026. 3 pages, complete. Signed by the Purchasing Coordinator.", "RD-78940_audit_scope_statement.pdf — Audit scope statement for customer audit visit RD-78940. Date of issue: 5 March 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_calibration_status_summary.pdf — Calibration status summary for customer audit visit RD-78940. Date of issue: 13 May 2026. 2 pages, complete. Signed by the Calibration Technician.", "RD-78940_audit_agenda.pdf — Audit agenda for customer audit visit RD-78940. Date of issue: 28 February 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_training_matrix_extract.pdf — Training matrix extract for customer audit visit RD-78940. Date of issue: 9 March 2026. 3 pages, complete. Signed by the Human Resources Coordinator.", "RD-78940_layout_tour_plan.pdf — Layout tour plan for customer audit visit RD-78940. Date of issue: 22 March 2026. 1 page, signed by the Quality Management Office Manager.", "RD-78940_document_control_list.pdf — Document control list for customer audit visit RD-78940. Date of issue: 14 March 2026. 4 pages, complete. Signed by the Document Control Coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 923}} {"id": "isc-te-00400-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravby plc", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "12 March 2026"}, "checklist": ["Inbound unloading record, issued within the last 1 months and signed.", "Damaged goods exception sheet, issued within the last 1 months and signed.", "Load consolidation sheet, issued within the last 3 months and signed.", "Outbound loading record, issued within the last 1 months and signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet, issued within the last 1 months and signed.", "Transfer manifest, signed.", "Cross-dock slot booking sheet, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer CF-57678", "reference": "AQ-93363", "details": ["The transfer includes a temperature-controlled load."]}, "documents received": ["Load-consolidation-sheet-CF-57678.pdf. A load consolidation sheet for cross-dock transfer CF-57678, dated 19 January 2026. 2 pages, complete, signed by the load planner.", "Cross-dock-chiller-unit-check-sheet-CF-57678.pdf. A cross-dock chiller unit check sheet for cross-dock transfer CF-57678, dated 6 March 2026. Single page, signed by the refrigeration technician.", "Damaged-goods-exception-sheet-CF-57678.pdf. A damaged goods exception sheet for cross-dock transfer CF-57678, dated 9 March 2026. Single page, signed by the shift supervisor.", "Outbound-loading-record-CF-57678.pdf. An outbound loading record for cross-dock transfer CF-57678, dated 4 March 2026. Single page, signed by the loading bay operator.", "Cross-dock-slot-booking-sheet-CF-57678.pdf. A cross-dock slot booking sheet for cross-dock transfer CF-57678, dated 7 March 2026. Single page, signed by the cross-dock coordinator.", "Transfer-manifest-CF-57678.pdf. A transfer manifest for cross-dock transfer CF-57678, dated 21 November 2025. 3 pages, complete, signed by the transport planner.", "Inbound-unloading-record-CF-57678.pdf. An inbound unloading record for cross-dock transfer CF-57678, dated 25 February 2026. Single page, signed by the inbound unloading operative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 980}} {"id": "isc-te-00215-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Briskmore SAS", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "2 June 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include: mediation request confirmation (issued within the last 1 months, signed)", "Include: breach evidence log (issued within the last 1 months, signed)", "Include: default notice previously served (issued within the last 6 months, signed)", "Include: termination clause legal opinion (issued within the last 1 months, signed)", "Include: losses calculation statement (issued within the last 1 months, signed)", "Include: original service agreement copy", "Include: litigation hold notice (issued within the last 1 months, signed)"], "submission": {"case": {"name": "Boltley Group", "reference": "EQ-15194", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Breach evidence log, Boltley Group, dated 19 May 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Default notice previously served, Boltley Group, dated 31 January 2026. One page. Signed by the contract manager.", "Losses calculation statement, Boltley Group, dated 29 May 2026. 3 pages, complete. Signed by the finance manager.", "Litigation hold notice, Boltley Group, dated 20 May 2026. 2 pages, complete. Signed by the legal counsel.", "Original service agreement copy, Boltley Group, dated 22 April 2026. 10 pages, complete.", "Mediation request confirmation, Boltley Group, dated 23 May 2026. One page. Signed by the mediation provider's case administrator."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete when checked against the checklist. Consider every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete: every applicable line is met (extra documents do not matter). Return incomplete: at least one applicable line is not met. Return unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-18", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 802}} {"id": "isc-te-00432-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Wynmark GmbH", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "14 September 2026"}, "checklist": ["Radiation safety training certificate, issued within the last 24 months and signed.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed.", "Photo identity document, valid (not expired) on the date of the review.", "Experiment safety clearance form, signed.", "Beam time or instrument booking confirmation."], "submission": {"case": {"name": "Noor Sabock", "reference": "VH-82380", "details": ["The researcher will work only during standard opening hours."]}, "cover note": "Could you please approve reference VH-82380 as quickly as possible? All the paperwork is in order, so it should be straightforward.", "documents received": ["Experiment safety clearance form for Noor Sabock, dated 18 June 2026, 3 pages, complete. It is signed by the experiment safety coordinator.", "Beam time or instrument booking confirmation for Noor Sabock, dated 8 August 2026, 1 page.", "Photo identity document for Noor Sabock, 1 page. The expiry date cannot be seen because it is covered by a stamp.", "Radiation safety training certificate for Noor Sabock, dated 6 April 2025, 1 page. It is signed by the radiation safety officer.", "Home institution endorsement letter for Noor Sabock, dated 10 September 2026, 1 page. It is signed by the head of Noor Sabock's home institution department."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 746}} {"id": "isc-te-00089-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Fravwyn Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "16 July 2026"}, "checklist": ["Special requests note, signed", "Booking request form, signed", "Flight availability printout, issued within the last 1 months", "Passport details form, signed", "Travel insurance quote, issued within the last 1 months", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review", "Customer deposit receipt, issued within the last 3 months"], "submission": {"case": {"name": "holiday booking DO-39970", "reference": "NL-53165", "details": ["All travellers on the booking are adults."]}, "documents received": ["Travel insurance quote DO-39970. Issued 8 July 2026. 2 pages, complete.", "Special requests note DO-39970. Issued 17 June 2026. 1 page, signed by the customer.", "Booking request form DO-39970. Issued 23 April 2026. 2 pages, complete, signed by the customer.", "Passport details form DO-39970. Issued 15 June 2026. 1 page, signed by the customer.", "Customer deposit receipt DO-39970. Issued 19 May 2026. 1 page.", "Flight availability printout DO-39970. Issued 8 July 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 746}} {"id": "isc-te-00416-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Ulmberg LLP", "reviewer": "the installer's survey team", "pack": "solar panel installation approval file", "purpose": "before the solar panels are installed on the roof", "date of the review": "2 June 2026"}, "checklist": ["Insurance notification letter, issued within the last 6 months", "Meter reading photo, issued within the last 1 months", "Survey booking form, signed", "Grid connection application, issued within the last 12 months, signed", "Scaffolding agreement, signed", "Energy performance certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "roof UO-80504", "reference": "IC-49989"}, "documents received": ["energy-performance-certificate.pdf. This is an energy performance certificate for roof UO-80504 with an expiry date of 23 October 2026. 3 pages, complete.", "ladder-safety-leaflet.pdf. This is a ladder safety leaflet for roof UO-80504, dated 18 March 2026. 2 pages, complete. It is signed by the site supervisor.", "grid-connection-application.pdf. This is a grid connection application for roof UO-80504, dated 22 May 2026. 2 pages, complete. It is signed by the customer.", "insurance-notification-letter.pdf. This is a single-page insurance notification letter for roof UO-80504, dated 2 March 2026.", "survey-booking-form.pdf. This is a single-page survey booking form for roof UO-80504, dated 14 April 2026. It is signed by the customer.", "meter-reading-photo.pdf. This is a single-page meter reading photo for roof UO-80504, dated 17 May 2026.", "scaffolding-agreement.pdf. This is a scaffolding agreement for roof UO-80504, dated 18 March 2026. 2 pages, complete. It is signed by the scaffolding contractor.", "planning-permission-letter.pdf. This is a planning permission letter for roof UO-80504, dated 30 September 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The decision to make is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves, not the notes.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "solar panel installation approval file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-43", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00189-p5-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ovarfield GmbH", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "17 June 2026"}, "checklist": ["Costed trip estimate sheet, issued within the last 3 months and signed.", "Travel advance request form, signed.", "Employee bank detail confirmation, issued within the last 6 months and signed.", "Travel policy extract showing advance eligibility.", "If the requested advance is above the standard advance limit, also: finance director approval for the higher advance, signed.", "Trip itinerary and approval, issued within the last 3 months and signed."], "submission": {"case": {"name": "Mert Bramstad", "reference": "VR-72958", "details": ["The requested advance is above the standard advance limit."]}, "documents received": ["VR-72958_d1_costed_trip_estimate_sheet.pdf. A single-page costed trip estimate sheet for Mert Bramstad, dated 28 April 2026. It is signed by the employee's line manager.", "VR-72958_d2_travel_advance_request_form.pdf. A single-page travel advance request form for Mert Bramstad, dated 21 March 2026. It is signed by the employee.", "VR-72958_d3_employee_bank_detail_confirmation.pdf. A single-page employee bank detail confirmation for Mert Bramstad, dated 29 May 2026. It is signed by the payroll administrator.", "VR-72958_d4_travel_policy_extract.pdf. A single-page travel policy extract showing advance eligibility for Mert Bramstad, dated 28 May 2026.", "VR-72958_d5_trip_itinerary_and_approval.pdf. A trip itinerary and approval for Mert Bramstad, dated 8 April 2026, 2 pages, complete. It is signed by the approving manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 797}} {"id": "isc-te-00033-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Wendstead Limited", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "23 June 2026"}, "checklist": ["Loss adjuster's inspection report, issued within the last 6 months and signed", "Council flood warning notice, issued within the last 12 months", "Flood claim form, signed", "Utility supplier's letter confirming the supply was cut off, issued within the last 12 months"], "submission": {"case": {"name": "property SP-19466", "reference": "IK-48540"}, "documents received": ["utility_supplier_letter_SP-19466.pdf - Utility supplier's letter confirming the supply was cut off at property SP-19466, dated 18 January 2026. Single page.", "council_flood_warning_notice_SP-19466.pdf - Council flood warning notice for property SP-19466, dated 7 November 2025. Single page.", "flood_claim_form_SP-19466_unsigned.pdf - Flood claim form for property SP-19466, dated 4 June 2026. 5 pages, complete. The signature line is empty; the form is not signed.", "loss_adjuster_inspection_report_SP-19466.pdf - Loss adjuster's inspection report for property SP-19466, dated 16 January 2026. 6 pages, complete. Signed by the loss adjuster."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 718}} {"id": "isc-te-00492-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Creskdale plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "4 March 2026"}, "checklist": ["Trade account application form, signed", "Credit reference agency report issued within the last 3 months", "Company registration certificate", "Credit limit approval memo issued within the last 1 months and signed", "If the customer requests a credit limit above the standard cap, also: finance director sanction letter issued within the last 1 months and signed"], "submission": {"case": {"name": "Dornmont LLP", "reference": "TD-47006", "details": ["The customer requests a credit limit above the standard cap."]}, "documents received": ["Credit limit approval memo for Dornmont LLP, dated 19 February 2026. Single page. Signed by the credit control manager.", "Company registration certificate for Dornmont LLP, dated 7 January 2026. 2 pages, complete.", "Credit reference agency report on Dornmont LLP, dated 11 August 2025. 6 pages, complete.", "Finance director sanction letter for Dornmont LLP, dated 18 February 2026. Single page. Signed by the finance director.", "Trade account application form for Dornmont LLP, dated 1 January 2026. 3 pages, complete. Signed by the customer's authorised signatory."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 687}} {"id": "isc-te-00019-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Xanvale LLP", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "26 March 2026"}, "checklist": ["If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "prerequisite certificate", "employer sponsorship letter (issued within the last 3 months, signed)", "cancellation policy acceptance (signed)", "payment confirmation (issued within the last 3 months)", "venue access instructions (issued within the last 3 months)", "course booking form (signed)"], "submission": {"case": {"name": "course booking HG-96006", "reference": "MZ-70767", "details": ["The course does not lead to a licensed qualification."]}, "documents received": ["Employer sponsorship letter for course booking HG-96006, dated 23 February 2026. Single page, signed by the employer's authorised signatory.", "Venue access instructions for course booking HG-96006, dated 17 January 2026. Single page.", "Cancellation policy acceptance for course booking HG-96006, dated 24 December 2025. Single page, signed by the course booking delegate.", "Prerequisite certificate for course booking HG-96006, dated 12 February 2026. Single page.", "Special requirements note for course booking HG-96006, dated 19 March 2026. Single page.", "Course booking form for course booking HG-96006, dated 10 January 2026. 2 pages, complete. Signed by the course booking delegate.", "Payment confirmation for course booking HG-96006, dated 11 January 2026. Single page."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 587}} {"id": "isc-te-00492-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Creskdale plc", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "4 March 2026"}, "checklist": ["Trade account application form, signed", "Credit reference agency report issued within the last 3 months", "Company registration certificate", "Credit limit approval memo issued within the last 1 months and signed", "If the customer requests a credit limit above the standard cap, also: finance director sanction letter issued within the last 1 months and signed"], "submission": {"case": {"name": "Dornmont LLP", "reference": "TD-47006", "details": ["The customer requests a credit limit above the standard cap."]}, "cover note": "Please find the pack for Dornmont LLP attached. Everything needed is there and complete.", "documents received": ["Company registration certificate for Dornmont LLP, dated 7 January 2026. 2 pages, complete.", "Finance director sanction letter for Dornmont LLP, dated 18 February 2026. Single page. Signed by the finance director.", "Credit limit approval memo for Dornmont LLP, dated 19 February 2026. Single page. Signed by the credit control manager.", "Credit reference agency report on Dornmont LLP, dated 22 November 2025. 6 pages, complete.", "Trade account application form for Dornmont LLP, dated 1 January 2026. 3 pages, complete. Signed by the customer's authorised signatory."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 710}} {"id": "isc-te-00204-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Faldfeld LLP", "reviewer": "the building maintenance manager", "pack": "air conditioning service pack", "purpose": "to keep the F-gas register up to date after each service", "date of the review": "8 May 2026"}, "checklist": ["Refrigerant top-up log, issued within the last 1 month and signed", "Plant room access sign-in sheet", "System pressure test results, issued within the last 1 month and signed", "F-gas leak check record, issued within the last 12 months and signed", "If refrigerant was added during the service, also: refrigerant recovery note, issued within the last 1 month and signed", "Engineer F-gas handling certificate, valid (not expired) on the date of the review"], "submission": {"case": {"name": "air conditioning system FW-33470", "reference": "JE-34942", "details": ["Refrigerant was added during the service."]}, "documents received": ["Engineer F-gas handling certificate for air conditioning system FW-33470, showing an expiry date of 12 January 2028, 1 page.", "Plant room access sign-in sheet for air conditioning system FW-33470, issued 4 April 2026, 1 page.", "Thermostat calibration certificate for air conditioning system FW-33470, issued 16 November 2025, 1 page.", "F-gas leak check record for air conditioning system FW-33470, issued 9 December 2025, 2 pages, complete. It is signed by the leak check engineer.", "Refrigerant top-up log for air conditioning system FW-33470, issued 19 April 2026, 1 page. It is signed by the servicing engineer.", "System pressure test results for air conditioning system FW-33470, issued 19 April 2026, 2 pages, complete. It is signed by the servicing engineer.", "Asset condition photograph sheet for air conditioning system FW-33470, issued 27 April 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "air conditioning service pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 850}} {"id": "isc-te-00152-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ilvstow GmbH", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "23 July 2026"}, "checklist": ["If the trip involves travel to a country requiring a visa, also: visa approval letter", "trip cost estimate (signed)", "If the traveller is not a passport holder of the destination country, also: work permit confirmation", "passport copy for international travel (valid (not expired) on the date of the review)", "hotel booking confirmation", "line manager approval (signed)"], "submission": {"case": {"name": "business trip JD-97425", "reference": "DE-41048", "details": ["The trip involves no country requiring a visa.", "The traveller is not a passport holder of the destination country."]}, "documents received": ["File: work permit confirmation JD-97425. A work permit confirmation for business trip JD-97425, dated 21 June 2026. 2 pages, complete.", "File: hotel booking confirmation JD-97425. A hotel booking confirmation for business trip JD-97425, dated 21 April 2026. 2 pages, complete.", "File: line manager approval JD-97425. A line manager approval for business trip JD-97425, dated 16 May 2026. It is 1 page and is signed by the line manager.", "File: visa entry requirement printout JD-97425. A visa entry requirement printout for business trip JD-97425, dated 5 May 2026. 2 pages, complete.", "File: trip cost estimate JD-97425. A trip cost estimate for business trip JD-97425, dated 3 June 2026. It is 1 page and carries a signature from the line manager.", "File: passport copy JD-97425.pdf. A passport copy for international travel for business trip JD-97425, showing an expiry date of 16 August 2026. It is 1 page.", "File: passport copy JD-97425.pdf. A passport copy for international travel for business trip JD-97425, showing an expiry date of 7 September 2025. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "expired", "defect": "expires soon after the review (still valid), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 908}} {"id": "isc-te-00361-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Zervcrest Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "11 August 2026"}, "checklist": ["Confirm the pack contains the proposed rule change specification, signed.", "Confirm the pack contains the risk assessment, issued within the last 3 months, signed.", "Confirm the pack contains the business justification memo, issued within the last 3 months, signed.", "Confirm the pack contains the firewall change request form, signed.", "If the change is planned during the year-end close period, also: confirm the pack contains the freeze period exception approval, signed.", "If the change opens a new inbound connection from the internet, also: confirm the pack contains the internet exposure review certificate, issued within the last 1 months, signed."], "submission": {"case": {"name": "firewall change WU-46525", "reference": "PN-13005", "details": ["The change is planned for a normal working week.", "The change only affects internal connections between servers."]}, "documents received": ["Project charter for an unrelated initiative, filed with the pack for firewall change WU-46525. Date of issue: 17 July 2026. Single page. Signed by the project sponsor.", "Current rule set export, firewall change WU-46525. Date of issue: 9 August 2026. 8 pages, complete.", "Risk assessment, firewall change WU-46525. Date of issue: 14 July 2026. 2 pages, complete. Signed by the information security risk analyst.", "Firewall change request form, firewall change WU-46525. Date of issue: 26 May 2026. 3 pages, complete. Signed by the requesting network engineer.", "Proposed rule change specification, firewall change WU-46525. Date of issue: 4 May 2026. 2 pages, complete. Signed by the network security architect.", "Business justification memo, firewall change WU-46525. Date of issue: 17 July 2026. Single page. Signed by the requesting business line manager."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 675}} {"id": "isc-te-00061-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pelllund Partners", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "24 July 2026"}, "checklist": ["Quality inspection report, issued within the last 6 months and signed", "Supplier performance scorecard, signed", "Corrective action plan, issued within the last 6 months and signed", "If the supplier is being considered for an expanded scope, also: expanded scope assessment memo, signed", "If the supplier missed the agreed service levels, also: service credit request form, signed", "Service level summary, issued within the last 12 months", "Contract compliance checklist, signed", "Delivery record summary, issued within the last 12 months"], "submission": {"case": {"name": "Pravheim Limited", "reference": "ZV-43025", "details": ["The supplier is being considered for an expanded scope.", "The supplier met all agreed service levels."]}, "cover note": "I am not sure everything needed is in this pack. It would be helpful if you could take a look and confirm.", "documents received": ["Corrective action plan about Pravheim Limited, dated 21 April 2026. 2 pages, complete. Signed by the supplier quality lead.", "Supplier performance scorecard about Pravheim Limited, dated 13 June 2026. 2 pages, complete. Signed by the supplier relationship manager.", "Delivery record summary about Pravheim Limited, dated 12 October 2025. 2 pages, complete.", "Service level summary about Pravheim Limited, dated 10 February 2026. Single page.", "Expanded scope assessment memo about Pravheim Limited, dated 6 May 2026. 2 pages, complete. Signed by the procurement manager.", "Invoice discrepancy log about Pravheim Limited, dated 12 June 2026. 2 pages, complete.", "Contract compliance checklist about Pravheim Limited, dated 8 July 2026. 3 pages, complete. Signed by the contract manager.", "Quality inspection report about Pravheim Limited, dated 25 February 2026. 3 pages, complete. Signed by the quality inspector.", "General factory tour handout about Pravheim Limited, dated 25 February 2026. 3 pages, complete. Signed by the site tour coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 888}} {"id": "isc-te-00252-p2-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Belmfell LLP", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "12 May 2026"}, "checklist": ["Facility access application form, signed", "Photo identity document, valid (not expired) on the date of the review", "Home institution endorsement letter, issued within the last 6 months and signed", "Radiation safety training certificate, issued within the last 24 months and signed", "Beam time or instrument booking confirmation", "Host scientist invitation letter, issued within the last 6 months and signed"], "submission": {"case": {"name": "Pieter Grubfield", "reference": "IS-40676"}, "documents received": ["Home institution endorsement letter - Grubfield 16 Apr 2025.pdf. A home institution endorsement letter for Pieter Grubfield, issued on 16 April 2025. Single page, signed by the head of department.", "Facility access application form - Grubfield.pdf. A facility access application form for Pieter Grubfield, dated 13 April 2026. 2 pages, complete. It is signed by the applicant.", "Beam time confirmation - Grubfield.pdf. A beam time or instrument booking confirmation for Pieter Grubfield, dated 4 March 2026. Single page.", "Photo identity document - Grubfield.pdf. A photo identity document for Pieter Grubfield showing an expiry date of 20 September 2027. Single page.", "Host scientist invitation letter - Grubfield.pdf. A host scientist invitation letter for Pieter Grubfield, issued on 16 January 2026. Single page, signed by the host scientist.", "Home institution endorsement letter - Grubfield 28 Nov 2025.pdf. A home institution endorsement letter for Pieter Grubfield, issued on 28 November 2025. Single page, signed by the head of department.", "Radiation safety training certificate - Grubfield.pdf. A radiation safety training certificate for Pieter Grubfield, issued on 23 October 2024. Single page, signed by the training provider."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 857}} {"id": "isc-te-00435-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Eskcourt SAS", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "5 March 2026"}, "checklist": ["Confirm the complaint category code sheet is present.", "If the complaint alleges a member of staff behaved rudely, also confirm the staff member written response (signed) is present.", "Confirm the original complaint record is present and was issued within the last 6 months.", "Confirm the policy breach summary is present, was issued within the last 3 months, and is signed.", "Confirm the proposed resolution letter draft is present and is signed.", "Confirm the store incident report is present, was issued within the last 3 months, and is signed.", "Confirm the goodwill gesture approval note is present, was issued within the last 1 months, and is signed."], "submission": {"case": {"name": "escalated complaint AZ-62550", "reference": "RC-36204", "details": ["The complaint alleges a member of staff behaved rudely."]}, "documents received": ["Goodwill gesture approval note, escalated complaint AZ-62550. Date of issue: 26 February 2026. 1 page. Signed by the head of customer relations.", "Policy breach summary, escalated complaint AZ-62550. Date of issue: 18 February 2026. 2 pages, complete. Signed by the store manager.", "Customer contact log, escalated complaint AZ-62550. Date of issue: 14 January 2026. 3 pages, complete.", "Original complaint record, escalated complaint AZ-62550. Date of issue: 22 October 2025. 2 pages, complete.", "Complaint category code sheet, escalated complaint AZ-62550. Date of issue: 20 February 2026. 1 page.", "Staff member written response, escalated complaint AZ-62550. Date of issue: 2 February 2026. 1 page. Signed by the staff member.", "Store incident report, escalated complaint AZ-62550. Date of issue: 22 February 2026. 2 pages, complete. Signed by the duty store manager.", "Proposed resolution letter draft, escalated complaint AZ-62550. Date of issue: 24 December 2025. 2 pages, complete. Signed by the customer relations manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 922}} {"id": "isc-te-00137-p5-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Fravmouth Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "15 July 2026"}, "checklist": ["Supplier quality questionnaire, issued within the last 12 months, signed.", "Supplier self-assessment report, issued within the last 12 months, signed.", "If the supplier provides parts that are safety-critical, also: process failure mode and effects analysis, signed.", "If the supplier subcontracts part of the production, also: subcontractor approval record, issued within the last 12 months, signed.", "Supplier audit report, issued within the last 24 months, signed.", "Financial stability statement, issued within the last 12 months, signed.", "Supplier capacity declaration, issued within the last 12 months, signed.", "Raw material certificate of analysis, issued within the last 6 months, signed."], "submission": {"case": {"name": "Mersley SAS", "reference": "XW-63469", "details": ["The supplier provides parts that are safety-critical.", "The supplier subcontracts part of the production."]}, "cover note": "Apologies for the rush in which this pack was assembled. Best wishes, Anna Stanell", "documents received": ["Certified quality management system certificate, Mersley SAS. Expiry date: 27 December 2027. Single page.", "Process failure mode and effects analysis, Mersley SAS. Date of issue: 1 June 2026. 9 pages, complete. Signed by the supplier's process engineer.", "Financial stability statement, Mersley SAS. Date of issue: 7 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Supplier quality questionnaire, Mersley SAS. Date of issue: 21 June 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Raw material certificate of analysis, Mersley SAS. Date of issue: 22 April 2026. 2 pages, complete. Signed by the supplier's laboratory manager.", "Supplier capacity declaration, Mersley SAS. Date of issue: 21 July 2025. 2 pages, complete. Signed by the supplier's operations manager.", "Supplier audit report, Mersley SAS. Date of issue: 19 March 2025. 8 pages, complete. Signed by the lead auditor.", "Supplier corrective action plan, Mersley SAS. Date of issue: 8 May 2026. 3 pages, complete. Signed by the supplier's quality manager.", "Subcontractor approval record, Mersley SAS. Date of issue: 9 August 2025. 2 pages, complete. Signed by the supplier's quality manager.", "Supplier self-assessment report, Mersley SAS. Date of issue: 18 October 2025. 6 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 8, "n_conditional": 2, "n_documents": 10, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1027}} {"id": "isc-te-00131-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Caelheim GmbH", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "14 May 2026"}, "checklist": ["Check that the pack contains a utilities connection certificate.", "Check that the pack contains a signed lease agreement.", "Check that the pack contains a floor load capacity report that is signed.", "Check that the pack contains a warehouse insurance policy that is still valid, not expired, on 14 May 2026.", "Check that the pack contains a fire safety certificate that is still valid, not expired, on 14 May 2026."], "submission": {"case": {"name": "warehouse PV-88477", "reference": "EJ-39928"}, "documents received": ["Floor load capacity report.pdf. This is the floor load capacity report for warehouse PV-88477, issued on 21 January 2026, 3 pages, complete. It is signed by the structural engineer.", "Lease agreement.pdf. This is the signed lease agreement for warehouse PV-88477, issued on 1 March 2026, 8 pages, complete. It is signed by the landlord.", "Fire safety certificate.pdf. This is the fire safety certificate for warehouse PV-88477, with an expiry date of 25 August 2028, 2 pages, complete.", "Office utility bill.pdf. This is a utility bill for the site's office at warehouse PV-88477, issued on 18 April 2026, 1 page.", "Warehouse insurance policy.pdf. This is the warehouse insurance policy for warehouse PV-88477, with an expiry date of 5 October 2027, 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack fulfils the checklist. Work through every checklist line relevant to this case. For a required document to count, it must be the kind of document the checklist lists (a similar one will not do), be about the subject of the case, have all its pages, be signed in every place the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, but at least one cannot be settled from what is shown, for instance when a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may prove misleading; evaluate the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-38", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 781}} {"id": "isc-te-00281-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Brenfell Group", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "31 August 2026"}, "checklist": ["Confirmation of contact details, issued within the last 3 months", "Account statement showing recent activity, issued within the last 1 months", "Delivery address confirmation, signed", "Signature verification record, signed", "Lost card declaration, signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed"], "submission": {"case": {"name": "Siobhan Thornmore", "reference": "HK-69511", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["Confirmation of contact details in the name of Siobhan Thornmore, dated 13 July 2026. Single page.", "Photo identification for Siobhan Thornmore, showing an expiry date of 11 April 2028. Single page.", "Lost card declaration for Siobhan Thornmore, dated 9 August 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Note about a damaged card in the name of Siobhan Thornmore, dated 9 August 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Fraud questionnaire for Siobhan Thornmore, dated 13 August 2026. 2 pages, complete. Signed by the cardholder, Siobhan Thornmore.", "Account statement showing recent activity for Siobhan Thornmore, dated 29 August 2026. 3 pages, complete.", "Temporary overseas address registration form for Siobhan Thornmore, dated 5 June 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Signature verification record for Siobhan Thornmore, dated 22 August 2026. Single page. Signed by the bank officer who carried out the verification.", "Delivery address confirmation for Siobhan Thornmore, dated 21 July 2026. Single page. Signed by the cardholder, Siobhan Thornmore."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 855}} {"id": "isc-te-00156-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Baxridge Group", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "15 June 2026"}, "checklist": ["Right to work share code printout, issued within the last 3 months", "Medical examination certificate, issued within the last 6 months and signed", "Criminal record check, issued within the last 3 months", "Signed licence application form", "If the applicant is applying for a hackney carriage licence rather than private hire, also: vehicle specification sheet for the hackney carriage"], "submission": {"case": {"name": "Seren Bixingham", "reference": "GY-35046", "details": ["The applicant is applying for a private hire licence rather than hackney carriage."]}, "cover note": "Please find attached everything needed for this pack, all complete.", "documents received": ["GY-35046 Bixingham licence application form. A licence application form about Seren Bixingham, showing its date of issue as 24 May 2026, 6 pages, complete. It is signed by the applicant, Seren Bixingham.", "GY-35046 Cormez right to work share code printout. A single-page right to work share code printout about Robert Cormez, showing its date of issue as 29 March 2026.", "GY-35046 Bixingham medical examination certificate. A medical examination certificate about Seren Bixingham, showing its date of issue as 24 March 2026, 2 pages, complete. It is signed by the examining doctor.", "GY-35046 Bixingham criminal record check. A criminal record check about Seren Bixingham, showing its date of issue as 10 June 2026, 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 779}} {"id": "isc-te-00132-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravstow SAS", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "9 July 2026"}, "checklist": ["Transfer manifest, signed.", "Cross-dock slot booking sheet, issued within the last 1 months, signed.", "Damaged goods exception sheet, issued within the last 1 months, signed.", "Transfer completion confirmation, issued within the last 1 months, signed.", "Load consolidation sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "cross-dock transfer EQ-46599", "reference": "YF-29707"}, "documents received": ["Outbound loading record for cross-dock transfer EQ-46599. Date of issue: 4 July 2026. 1 page. Signed by the outbound loading supervisor.", "Cross-dock slot booking sheet for cross-dock transfer EQ-46599. Date of issue: 27 June 2026. 1 page. Signed by the cross-dock coordinator.", "Transfer completion confirmation for cross-dock transfer EQ-46599. Date of issue: 28 June 2026. 1 page. Signed by the cross-dock supervisor.", "Load consolidation sheet for cross-dock transfer EQ-46599. Date of issue: 14 June 2026. 2 pages, complete. Signed by the load planner.", "Transfer manifest for cross-dock transfer EQ-46599. Date of issue: 13 March 2026. 3 pages, complete. Signed by the transport planner.", "Damaged goods exception sheet for cross-dock transfer EQ-46599. Date of issue: 27 June 2026. 1 page. Signed by the warehouse operator."]}}, "question": {"type": "choice", "instructions": "Determine whether the pack is complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Mark the pack complete if every applicable line is met (extra documents do not matter). Mark the pack incomplete if at least one applicable line is not met. Mark the pack unclear if no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-28", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 799}} {"id": "isc-te-00274-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Vasklund GmbH", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "19 June 2026"}, "checklist": ["Asset register update, issued within the last 1 months", "Data wipe certificate, issued within the last 3 months, signed", "Final backup confirmation, issued within the last 3 months, signed", "Data migration confirmation, issued within the last 3 months, signed", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed", "Licence reassignment note, issued within the last 3 months, signed"], "submission": {"case": {"name": "retired server PX-71814", "reference": "WW-93737"}, "cover note": "A colleague has already checked this pack, so it should be ready to go through.", "documents received": ["Licence reassignment note for retired server PX-71814, dated 1 April 2026, 1 page, signed by the licence manager.", "Data wipe certificate for retired server PX-71814, dated 12 May 2026, 1 page, signed by the data sanitisation technician.", "Final backup confirmation for retired server PX-71814, dated 27 April 2026, 1 page, signed by the backup administrator.", "Asset register update for retired server PX-71814, dated 29 May 2026, 1 page.", "Data migration confirmation for retired server PX-71814, dated 16 April 2026, 2 pages, complete, signed by the migration lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 760}} {"id": "isc-te-00197-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Yarvwood Group", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "2 September 2026"}, "checklist": ["Authorised representative ID copy, valid (not expired) on the date of the review.", "Anti-money laundering questionnaire, signed.", "Tax registration letter.", "Business registration certificate.", "Product catalogue declaration, signed.", "Returns policy statement, signed."], "submission": {"case": {"name": "Quorgate GmbH", "reference": "HF-92686"}, "documents received": ["Tax registration letter for Quorgate GmbH. It shows a date of issue of 2 August 2026. 1 page.", "Authorised representative ID copy for Quorgate GmbH. It shows an expiry date of 18 September 2026. 1 page.", "Business registration certificate for Quorgate GmbH. It shows a date of issue of 2 July 2026. 1 page.", "Product catalogue declaration for Quorgate GmbH. It shows a date of issue of 20 August 2026. 4 pages, complete. It is signed by the authorised representative.", "Anti-money laundering questionnaire for Quorgate GmbH. It shows a date of issue of 6 June 2026. 3 pages, complete. It is signed by the authorised representative.", "Proof of trading address for Quorgate GmbH. It shows a date of issue of 2 August 2026. 1 page.", "Returns policy statement for Quorgate GmbH. It shows a date of issue of 27 August 2026. 2 pages, complete. It is signed by the authorised representative."]}}, "question": {"type": "choice", "instructions": "Determine if the pack is complete when checked against the checklist. Consider every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Return complete: every applicable line is met (extra documents do not matter). Return incomplete: at least one applicable line is not met. Return unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Remember that cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-18", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 768}} {"id": "isc-te-00271-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Ilvhurst SAS", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "23 March 2026"}, "checklist": ["Leaver notification form, signed", "Non-disclosure reminder acknowledgement, signed", "Final payroll cut-off note, signed, issued within the last 1 months", "Service desk ticket closure summary, issued within the last 1 months"], "submission": {"case": {"name": "Declan Vellridge", "reference": "QT-58639"}, "documents received": ["Payslip from an earlier month for Declan Vellridge, issued 10 March 2026. Single page. Signed by the payroll officer.", "Final payroll cut-off note for Declan Vellridge, issued 10 March 2026. Single page. Signed by the payroll officer.", "Service desk ticket closure summary for Declan Vellridge, issued 9 March 2026. 3 pages, complete.", "Leaver notification form for Declan Vellridge, issued 30 November 2025. 2 pages, complete. Signed by the line manager.", "Non-disclosure reminder acknowledgement for Declan Vellridge, issued 5 March 2026. Single page. Signed by the departing employee.", "Line manager confirmation for Declan Vellridge, issued 20 March 2026. Single page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 699}} {"id": "isc-te-00114-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Yarvwell GmbH", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "22 June 2026"}, "checklist": ["Confirm the pack contains a planned completion date sheet, signed.", "If the job involves working at height above two metres, also confirm the pack contains a permit to work at height, issued within the last 1 months and signed.", "Confirm the pack contains a parts order confirmation, issued within the last 1 months.", "Confirm the pack contains a risk assessment for the task, issued within the last 3 months and signed.", "Confirm the pack contains a location details sheet.", "Confirm the pack contains photographs of the fault, issued within the last 3 months."], "submission": {"case": {"name": "maintenance request XG-95176", "reference": "VZ-64645", "details": ["The job involves working at height above two metres."]}, "documents received": ["Risk assessment for the task for maintenance request XG-95176, dated 17 April 2026. 5 pages, complete, signed by the assessing supervisor.", "Parts order confirmation for maintenance request XG-95176, dated 4 June 2026. 1 page.", "Location details sheet for maintenance request XG-95176, dated 31 May 2026. 1 page.", "Planned completion date sheet for maintenance request XG-95176, dated 4 March 2026. 1 page, signed by the facilities helpdesk supervisor.", "Photographs of the fault for maintenance request XG-95176, dated 24 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 764}} {"id": "isc-te-00041-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Creskheim & Co", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "23 April 2026"}, "checklist": ["Company registration certificate.", "Trade references letter, issued within the last 3 months, signed.", "Credit reference agency report, issued within the last 3 months.", "If the customer is a newly incorporated company, also: director identification record, signed.", "Bank reference letter, issued within the last 6 months, signed.", "Signed credit terms agreement, signed.", "Credit limit approval memo, issued within the last 1 months, signed.", "If the customer requests a credit limit above the standard cap, also: finance director sanction letter, issued within the last 1 months, signed."], "submission": {"case": {"name": "Ivrfeld & Co", "reference": "QG-16044", "details": ["The customer is a newly incorporated company.", "The customer requests a credit limit above the standard cap."]}, "documents received": ["Finance director sanction letter for Ivrfeld & Co. Date of issue: 5 April 2026. Single page. Signed by the finance director.", "Bank reference letter for Bravmark Ltd. Date of issue: 2 April 2026. Single page. Signed by the bank manager.", "Director identification record for Ivrfeld & Co. Date of issue: 5 January 2026. 2 pages, complete. Signed by a director.", "Company registration certificate for Ivrfeld & Co. Date of issue: 23 March 2026. 2 pages, complete.", "Trade references letter for Ivrfeld & Co. Date of issue: 3 April 2026. Single page. Signed by the referee.", "Credit reference agency report for Ivrfeld & Co. Date of issue: 17 April 2026. 6 pages, complete.", "Credit limit approval memo for Ivrfeld & Co. Date of issue: 14 April 2026. Single page. Signed by the credit manager.", "Signed credit terms agreement for Ivrfeld & Co. Date of issue: 1 January 2026. 4 pages, complete. Signed by the customer."]}}, "question": {"type": "choice", "instructions": "Does the pack meet the checklist? Examine each checklist line that applies to this case, one by one. A required document counts only if: it is the kind of document listed (not a similar one); it is about the subject of the case; it has all its pages; it is signed where the checklist asks for a signature; it has not expired on the date of the review; and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-2", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 875}} {"id": "isc-te-00241-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Glenside Ltd", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "2 March 2026"}, "checklist": ["Service level summary, issued within the last 12 months", "Corrective action plan, issued within the last 6 months, signed", "Contract compliance checklist, signed", "Supplier performance scorecard, signed", "Invoice discrepancy log"], "submission": {"case": {"name": "Varnridge Partners", "reference": "SE-38332"}, "documents received": ["Bank statement - Varnridge Partners.pdf. The document is a bank statement showing payments made about Varnridge Partners, dated 7 December 2025, with 2 pages, complete.", "Invoice discrepancy log - Varnridge Partners.pdf. The document is an invoice discrepancy log about Varnridge Partners, dated 7 December 2025, with 2 pages, complete.", "Supplier performance scorecard - Varnridge Partners.pdf. The document is a supplier performance scorecard about Varnridge Partners, dated 6 February 2026, with 2 pages, complete. It is signed by the category manager.", "Delivery record summary - Varnridge Partners.pdf. The document is a delivery record summary about Varnridge Partners, dated 1 August 2025, with 2 pages, complete.", "Contract compliance checklist - Varnridge Partners.pdf. The document is a contract compliance checklist about Varnridge Partners, dated 30 January 2026, with 3 pages, complete. It is signed by the procurement officer.", "Service level summary - Varnridge Partners.pdf. The document is a service level summary about Varnridge Partners, dated 20 May 2025. It is a single page.", "Corrective action plan - Varnridge Partners.pdf. The document is a corrective action plan about Varnridge Partners, dated 23 December 2025, with 2 pages, complete. It is signed by the supplier's account manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 815}} {"id": "isc-te-00060-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Glengard Group", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "3 April 2026"}, "checklist": ["Bank details confirmation letter, issued within the last 3 months and signed", "Certificate of insurance, valid (not expired) on the date of the review", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid (not expired) on the date of the review", "If the supplier is a foreign company, also: certified translation of the certificate of incorporation, signed", "Supplier registration form, signed", "Anti-bribery policy statement, signed", "Certificate of incorporation", "Supplier declaration of no conflicts of interest, signed"], "submission": {"case": {"name": "Austwyn Limited", "reference": "LU-89623", "details": ["The supplier is a small business with a single owner.", "The supplier is a domestic company."]}, "documents received": ["Certificate of incorporation for Austwyn keep name consistent: Austwyn Limited. Dated 7 January 2026, 2 pages, complete.", "Supplier declaration of no conflicts of interest for Austwyn Limited. Dated 27 March 2026, 1 page, signed by the supplier's managing director.", "Anti-bribery policy statement for Austwyn Limited. Dated 11 January 2026, 2 pages, complete, signed by the supplier's managing director.", "Bank details confirmation letter for Austwyn Limited. Dated 21 March 2026, 1 page, signed by the supplier's finance manager.", "Supplier registration form for Austwyn Limited. Dated 8 January 2026, 3 pages, complete, signed by the supplier's managing director.", "Signed copy of the general terms and conditions for Austwyn Limited. Dated 8 March 2026, 6 pages, complete, signed by the supplier's managing director.", "Certificate of insurance for Austwyn Limited. Shows an expiry date of 5 July 2028, 2 pages, complete.", "Copy of the owner's photo identification for Austwyn Limited. Shows an expiry date of 28 May 2027, 1 page.", "Company tax clearance certificate for Austwyn Limited. Shows an expiry date of 3 February 2028, 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 899}} {"id": "isc-te-00024-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lindgard BV", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "15 September 2026"}, "checklist": ["New floor snagging list, issued within the last 1 month and signed", "If the move takes place over a weekend, also: weekend security cover booking form, signed", "Crate hire agreement, signed", "Furniture inventory list, issued within the last 1 month and signed", "Parking bay suspension approval, issued within the last 1 month and signed", "Signed move plan, signed"], "submission": {"case": {"name": "office move project SN-2980", "reference": "YD-55373"}, "documents received": ["Crate hire agreement for office move project SN-2980, dated 6 August 2026. 2 pages, complete. Signed by the crate hire supplier.", "Furniture inventory list for office move project SN-2980, dated 5 September 2026. 4 pages, complete. Signed by the facilities coordinator.", "Signed move plan for office move project SN-2980, dated 6 June 2026. 6 pages, complete. Signed by the project manager.", "Parking bay suspension approval for office move project SN-2980, dated 6 September 2026. Single page. Signed by the local authority parking officer.", "New floor snagging list for office move project SN-2980, dated 29 August 2026. 3 pages, complete. Signed by the site manager."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 542}} {"id": "isc-te-00490-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravness Group", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "14 July 2026"}, "checklist": ["Fire safety certificate: valid (not expired) on the date of the review", "Floor load capacity report: signed", "Utilities connection certificate", "Signed lease agreement: signed"], "submission": {"case": {"name": "warehouse MI-17904", "reference": "DQ-47245"}, "documents received": ["floor_load_capacity_report_MI-17904.pdf — Floor load capacity report for warehouse MI-17904. Date of issue: 18 April 2026. 3 pages, complete. Signed by the structural engineer.", "fire_safety_certificate_MI-17904.pdf — Fire safety certificate for warehouse MI-17904. Expiry date: 1 January 2027. 2 pages, complete.", "utilities_connection_certificate_MI-17904.pdf — Utilities connection certificate for warehouse MI-17904. Date of issue: 2 May 2026. Single page.", "signed_lease_agreement_MI-17904.pdf — Signed lease agreement for warehouse MI-17904. Date of issue: 14 June 2026. 8 pages, complete. Signed by the landlord and the tenant."]}}, "question": {"type": "choice", "instructions": "Judge whether the pack meets the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "variant-12", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 688}} {"id": "isc-te-00413-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Quorhaven BV", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "31 July 2026"}, "checklist": ["Confirm the pack contains a store installation guide.", "Confirm the pack contains a flammability test certificate issued within the last 12 months.", "Confirm the pack contains a brand colour specification.", "Confirm the pack contains a shipping manifest issued within the last 1 months.", "Confirm the pack contains a kit contents list.", "Confirm the pack contains a kit cost breakdown issued within the last 3 months and signed."], "submission": {"case": {"name": "merchandising kit BG-68516", "reference": "EJ-95989"}, "documents received": ["Store installation guide for merchandising kit BG-68516, dated 29 May 2026. 6 pages, complete.", "Kit cost breakdown for merchandising kit BG-68516, dated 17 July 2026. 2 pages, complete. Signed by the finance manager.", "Shipping manifest for merchandising kit BG-68516, dated 12 July 2026. 2 pages, complete.", "File scan_048.pdf: the contents cannot be seen, as the scan is blank.", "Kit contents list for merchandising kit BG-68516, dated 19 April 2026. 2 pages, complete.", "Brand colour specification for merchandising kit BG-68516, dated 7 June 2026. Single page.", "Flammability test certificate for merchandising kit BG-68516, dated 17 July 2026. Single page."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete when checked against the checklist. Go through each line of the checklist that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "partial", "defect": "all pages present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-10", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 779}} {"id": "isc-te-00183-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Pentmere BV", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "23 June 2026"}, "checklist": ["Final backup confirmation, issued within the last 3 months, signed.", "Licence reassignment note, issued within the last 3 months, signed.", "Data migration confirmation, issued within the last 3 months, signed.", "Network disconnection confirmation, issued within the last 1 months, signed.", "If the server holds archived records that must be kept, also: archive retention confirmation, issued within the last 3 months, signed."], "submission": {"case": {"name": "retired server CA-57344", "reference": "IG-40941", "details": ["The server holds archived records that must be kept."]}, "documents received": ["Data migration confirmation for retired server CA-57344, dated 16 May 2026, 2 pages, complete, signed by the data migration lead.", "Data wipe certificate for retired server CA-57344, dated 29 April 2026, single page, signed by the data wipe technician.", "Archive retention confirmation for retired server CA-57344, dated 17 April 2026, 2 pages, complete, signed by the records manager.", "Network disconnection confirmation for retired server CA-57344, dated 16 June 2026, single page; the signature block is covered by a sticky note, so it is not known whether it is signed.", "Licence reassignment note for retired server CA-57344, dated 23 May 2026, single page, signed by the licence manager.", "Final backup confirmation for retired server CA-57344, dated 15 April 2026, single page, signed by the backup administrator.", "Dependent systems check report for retired server CA-57344, dated 12 May 2026, 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 832}} {"id": "isc-te-00141-p4-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Aldholm plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "7 July 2026"}, "checklist": ["Confirm the pack includes the account closure procedure.", "Confirm the pack includes the account request form, signed.", "Confirm the pack includes the naming convention approval, signed.", "If the account will be run by an external agency, also: confirm the pack includes the agency access agreement, signed.", "Confirm the pack includes the content escalation route, signed.", "Confirm the pack includes the platform terms acceptance record, signed.", "Confirm the pack includes the two-factor authentication confirmation, issued within the last 3 months."], "submission": {"case": {"name": "new social media account SA-68108", "reference": "VD-16282", "details": ["The account will be run entirely by in-house staff."]}, "documents received": ["A single-page account purpose statement for new social media account SA-68108, dated 7 May 2026.", "A single-page naming convention approval for new social media account SA-68108, dated 19 May 2026, signed by the social media governance team lead.", "A single-page account closure procedure for new social media account SA-68108, dated 22 March 2026.", "File scan004.tif: the scan is blank, so its contents cannot be seen.", "A single-page content escalation route for new social media account SA-68108, dated 25 April 2026, signed by the communications manager.", "A single-page platform terms acceptance record for new social media account SA-68108, dated 9 June 2026, signed by the account owner.", "A single-page account request form for new social media account SA-68108, dated 5 April 2026, signed by the requesting manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00234-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Nordridge & Co", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "13 April 2026"}, "checklist": ["Confirm the pack includes an account purpose statement.", "Confirm the pack includes a two-factor authentication confirmation issued within the last 3 months.", "Confirm the pack includes an admin access list issued within the last 3 months.", "Confirm the pack includes a naming convention approval that is signed.", "If the account will post content about financial products, also confirm the pack includes a financial promotions approval note issued within the last 3 months and signed.", "Confirm the pack includes an account request form that is signed."], "submission": {"case": {"name": "new social media account WY-2923", "reference": "PH-42275"}, "documents received": ["Scanned account request form about new social media account WY-2923, showing its date of issue as 13 March 2026, and signed by the requesting marketing manager. The scan is a single page.", "Scanned two-factor authentication confirmation about new social media account WY-2923, showing its date of issue as 22 March 2026. The scan is a single page.", "Scanned naming convention approval about new social media account WY-2923, showing its date of issue as 5 April 2026, and signed by the social media governance team lead. The scan is a single page.", "Scanned account purpose statement about new social media account WY-2923, showing its date of issue as 29 December 2025. The scan is a single page.", "Scanned admin access list about new social media account WY-2923, showing its date of issue as 21 February 2026. The scan is a single page.", "Scanned platform terms acceptance record about new social media account WY-2923, showing its date of issue as 30 January 2026, and signed by the requesting marketing manager. The scan is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 838}} {"id": "isc-te-00256-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Mersfell BV", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "29 May 2026"}, "checklist": ["Include the original complaint record, issued within the last 6 months.", "Include the goodwill gesture approval note, issued within the last 1 months and signed.", "Include the proposed resolution letter draft, signed.", "Include the customer contact log, issued within the last 3 months.", "Include the policy breach summary, issued within the last 3 months and signed.", "Include the complaint escalation form, issued within the last 1 months and signed."], "submission": {"case": {"name": "escalated complaint SD-98346", "reference": "GZ-99079"}, "cover note": "The pack has already been checked by a colleague.", "documents received": ["SD-98346_goodwill_gesture_approval_note.pdf - Goodwill gesture approval note for escalated complaint SD-98346. Date of issue: 14 May 2026. Single page, signed by the Customer Relations Manager.", "SD-98346_complaint_escalation_form.pdf - Complaint escalation form for escalated complaint SD-98346. Date of issue: 26 May 2026. 2 pages, complete, signed by the Customer Relations Manager.", "File_ref_09.pdf - The scan is blank, so its contents cannot be seen.", "SD-98346_policy_breach_summary.pdf - Policy breach summary for escalated complaint SD-98346. Date of issue: 1 May 2026. 2 pages, complete, signed by the Compliance Officer.", "SD-98346_original_complaint_record.pdf - Original complaint record for escalated complaint SD-98346. Date of issue: 24 April 2026. 2 pages, complete.", "SD-98346_proposed_resolution_letter_draft.pdf - Proposed resolution letter draft for escalated complaint SD-98346. Date of issue: 22 May 2026. 2 pages, complete, signed by the Customer Relations Manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 858}} {"id": "isc-te-00026-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Delvston & Co", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "17 August 2026"}, "checklist": ["Current working pattern statement, issued within the last 3 months.", "Flexible working request form, signed.", "Proposed working pattern plan, signed.", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed.", "Trial period proposal, signed.", "Client or service impact statement, signed."], "submission": {"case": {"name": "Hannah Kipock", "reference": "CM-83789", "details": ["The employee has caring responsibilities for a dependent."]}, "documents received": ["Trial period proposal, Hannah Kipock. Date of issue: 23 June 2026. 1 page. Signed by the line manager.", "Customer complaint letter about something else, Hannah Kipock. Date of issue: 25 June 2026. 1 page. Signed by the customer.", "Flexible working request form, Hannah Kipock. Date of issue: 29 May 2026. 3 pages, complete. Signed by the employee, Hannah Kipock.", "Current working pattern statement, Hannah Kipock. Date of issue: 16 July 2026. 1 page.", "Caring responsibilities statement, Hannah Kipock. Date of issue: 16 May 2026. 1 page. Signed by the employee, Hannah Kipock.", "Impact assessment on the team, Hannah Kipock. Date of issue: 10 June 2026. 3 pages, complete. Signed by the line manager.", "Proposed working pattern plan, Hannah Kipock. Date of issue: 22 July 2026. 2 pages, complete. Signed by the employee, Hannah Kipock."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 789}} {"id": "isc-te-00282-p3-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Briskmere GmbH", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "18 June 2026"}, "checklist": ["Proof of registered office address, issued within the last 3 months", "Board resolution to open the account, signed", "Company tax registration certificate", "Certificate of incorporation", "If the company operates in a cash-intensive trade, also: cash handling policy, signed"], "submission": {"case": {"name": "Norvhurst SAS", "reference": "HH-86347", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["Scanned beneficial owner identification form for Norvhurst SAS, dated 28 February 2026. 3 pages, complete. Signed by the managing director.", "Scanned certificate of incorporation for Norvhurst SAS, dated 10 June 2026. Single page.", "Scanned board resolution to open the account for Norvhurst SAS, dated 3 May 2026. Single page, signed by the chairman of the board.", "Scanned company tax registration certificate for Norvhurst SAS, dated 25 March 2026. Single page.", "Scanned proof of registered office address for Norvhurst SAS, dated 31 December 2025. Single page.", "Scanned cash handling policy for Norvhurst SAS, dated 4 May 2026. 2 pages, complete. Signed by the managing director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 704}} {"id": "isc-te-00045-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Teskmouth BV", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "24 June 2026"}, "checklist": ["If the supplier subcontracts part of the production, also: subcontractor approval record (issued within the last 12 months, signed)", "Raw material certificate of analysis (issued within the last 6 months, signed)", "Financial stability statement (issued within the last 12 months, signed)", "Supplier self-assessment report (issued within the last 12 months, signed)", "Certified quality management system certificate (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Orrwood Ltd", "reference": "EW-86026", "details": ["The supplier carries out all production in-house."]}, "documents received": ["Supplier self-assessment report for Orrwood Ltd, dated 7 September 2025. 6 pages, complete. Signed by the supplier's quality manager.", "Financial stability statement for Orrwood Ltd, dated 18 March 2026. 2 pages, complete. Signed by the supplier's finance director.", "Certified quality management system certificate for Orrwood Ltd, with an expiry date of 7 September 2026. Single page.", "Raw material certificate of analysis for Orrwood Ltd, dated 9 February 2026. 2 pages, complete. Signed by the supplier's quality manager.", "Supplier quality questionnaire for Orrwood Ltd, dated 7 May 2026. 4 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 730}} {"id": "isc-te-00080-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Morvfell & Co", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "26 August 2026"}, "checklist": ["Root cause analysis report, issued within the last 3 months and signed.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Service level objective breach record, issued within the last 3 months.", "Follow-up owner assignment sheet, issued within the last 3 months and signed.", "Alerting rules review note, issued within the last 3 months."], "submission": {"case": {"name": "production incident VT-77812", "reference": "UP-54074"}, "cover note": "Everything needed for this pack is attached and complete. Please go ahead with the review.", "documents received": ["Root cause analysis report for production incident VT-77812, dated 7 July 2026. 5 pages, complete. Signed by the reliability engineering lead.", "Alerting rules review note for production incident VT-77812, dated 21 June 2026. 2 pages, complete.", "Customer impact statement for production incident VT-77812, dated 3 July 2026. 2 pages, complete.", "Postmortem meeting minutes for production incident VT-77812, dated 20 July 2026. 3 pages, complete. Signed by the chair of the postmortem meeting.", "Service level objective breach record for production incident VT-77812, dated 29 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 738}} {"id": "isc-te-00254-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Elvwater BV", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 June 2026"}, "checklist": ["Annual activity report, issued within the last 6 months, signed.", "If the institute received industry funding above the university's disclosure threshold, also: industry funding disclosure statement, issued within the last 12 months, signed.", "Staffing plan, issued within the last 6 months, signed.", "Financial expenditure summary, issued within the last 3 months, signed.", "Doctoral researcher progress summary, issued within the last 6 months, signed.", "Intellectual property register extract, issued within the last 6 months, signed.", "Director's declaration of interests, issued within the last 12 months, signed."], "submission": {"case": {"name": "Wendmere Inc", "reference": "GI-71566", "details": ["The institute received industry funding above the university's disclosure threshold."]}, "documents received": ["Wendmere Inc financial expenditure summary.pdf - A financial expenditure summary for Wendmere Inc, dated 16 April 2026. It has 3 pages, complete, and is signed by the institute finance officer.", "Wendmere Inc staffing plan.pdf - A staffing plan for Wendmere Inc, dated 3 April 2026. It has 2 pages, complete, and is signed by the institute director.", "Wendmere Inc publications list.pdf - A publications list for Wendmere Inc, dated 7 September 2025. It has 4 pages, complete.", "Wendmere Inc intellectual property register extract.pdf - An intellectual property register extract for Wendmere Inc, dated 11 February 2026. It is a single page and is signed by the head of technology transfer.", "Wendmere Inc doctoral researcher progress summary.pdf - A doctoral researcher progress summary for Wendmere Inc, dated 22 January 2026. It has 2 pages, complete, and is signed by the doctoral programme coordinator.", "Wendmere Inc annual activity report.pdf - An annual activity report for Wendmere Inc, dated 2 April 2026. It has 12 pages, complete, and is signed by the institute director.", "Wendmere Inc director's declaration of interests.pdf - A director's declaration of interests for Wendmere Inc, dated 28 February 2026. It is a single page and is signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 919}} {"id": "isc-te-00101-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Morvdale LLP", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "20 May 2026"}, "checklist": ["Confirm the pack includes company statutes (signed).", "Confirm the pack includes company tax registration certificate.", "Confirm the pack includes proof of registered office address (issued within the last 3 months).", "Confirm the pack includes certificate of incorporation.", "Confirm the pack includes authorised signer identity document (valid (not expired) on the date of the review).", "Confirm the pack includes beneficial owner identification form (signed).", "If the company operates in a cash-intensive trade, also: cash handling policy (signed)."], "submission": {"case": {"name": "Eskholm Ltd", "reference": "DW-46602", "details": ["The company does not operate in a cash-intensive trade."]}, "cover note": "This pack has already been checked by a colleague before being sent to you.", "documents received": ["Heskvik Group - Certificate of incorporation.pdf - Certificate of incorporation for Heskvik Group, issued 18 April 2026. Single page.", "Eskholm Ltd - Authorised signer identity document.pdf - Authorised signer identity document for Eskholm Ltd, with expiry date 21 November 2026. Single page.", "Eskholm Ltd - Company tax registration certificate.pdf - Company tax registration certificate for Eskholm Ltd, issued 4 May 2026. Single page.", "Eskholm Ltd - Beneficial owner identification form.pdf - Beneficial owner identification form for Eskholm Ltd, issued 23 January 2026. 3 pages, complete. Signed by the authorised signer.", "Eskholm Ltd - Company statutes.pdf - Company statutes for Eskholm Ltd, issued 28 February 2026. 12 pages, complete. Signed by the chair of the board.", "Eskholm Ltd - Proof of registered office address.pdf - Proof of registered office address for Eskholm Ltd, issued 17 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 823}} {"id": "isc-te-00389-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Mersstow Partners", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "3 July 2026"}, "checklist": ["Trial period proposal, signed.", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed.", "Impact assessment on the team, signed.", "Flexible working request form, signed.", "Proposed working pattern plan, signed.", "Client or service impact statement, signed."], "submission": {"case": {"name": "Elif Arnstad", "reference": "VD-24090", "details": ["The employee has caring responsibilities for a dependent."]}, "cover note": "This pack was already checked by a colleague.", "documents received": ["Flexible working request form - Elif Arnstad - 24 March 2026.pdf. Flexible working request form concerning Elif Arnstad, dated 24 March 2026. It is 3 pages, complete, and is signed by the employee.", "Impact assessment on the team - Elif Arnstad - 1 May 2026.pdf. Impact assessment on the team concerning Elif Arnstad, dated 1 May 2026. It is 3 pages, complete, and is signed by the line manager.", "Client or service impact statement - Elif Arnstad - 14 June 2026.pdf. Client or service impact statement concerning Elif Arnstad, dated 14 June 2026. It is 1 page and is signed by the service lead.", "Proposed working pattern plan - Elif Arnstad - 17 May 2026.pdf. Proposed working pattern plan concerning Elif Arnstad, dated 17 May 2026. It is 2 pages, complete, and is signed by the line manager.", "Trial period proposal - Elif Arnstad - 19 March 2026.pdf. Trial period proposal concerning Elif Arnstad, dated 19 March 2026. It is 1 page and is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00100-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Elvwell Group", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "23 April 2026"}, "checklist": ["Bank statement (issued within the last 3 months)", "If the property is a new build, also: new build warranty certificate", "Sale and purchase agreement (signed)", "Property valuation report (issued within the last 6 months, signed)", "Proof of deposit (issued within the last 3 months)", "Mortgage application form (signed)"], "submission": {"case": {"name": "property NL-32293", "reference": "OP-43626", "details": ["The property is a new build."]}, "documents received": ["Credit_bureau_report_NL-32293.pdf - Credit bureau report for property NL-32293. Date of invented: 14 April 2026. 4 pages, complete.", "Sale_and_purchase_agreement_NL-32293.pdf - Sale and purchase agreement for property NL-32293. Date of issue: 9 January 2026. 9 pages, complete. Signed by the buyer and the seller.", "New_build_warranty_certificate_NL-32293.pdf - New build warranty certificate for property NL-32293. Date of issue: 1 February 2026. 3 pages, complete.", "Proof_of_deposit_NL-32293.pdf - Proof of deposit for property NL-32293. Date of issue: 23 February 2026. 1 page.", "Mortgage_application_form_NL-32293.pdf - Mortgage application form for property NL-32293. Date of issue: 10 March 2026. 6 pages, complete. Signed by the applicant.", "Property_valuation_report_NL-32293.pdf - Property valuation report for property NL-32293. Date of issue: 8 December 2025. 10 pages, complete. Signed by the valuer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00299-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Glenby Ltd", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "16 September 2026"}, "checklist": ["If the employee has caring responsibilities for a dependent, also: caring responsibilities statement (signed)", "client or service impact statement (signed)", "trial period proposal (signed)", "previous flexible working requests record (issued within the last 24 months)", "impact assessment on the team (signed)"], "submission": {"case": {"name": "Siobhan Nebbins", "reference": "XG-87607", "details": ["The employee has caring responsibilities for a dependent."]}, "documents received": ["Previous flexible working requests record about Siobhan Nebbins. Dated 23 August 2025. 1 page.", "Impact assessment on the team about Siobhan Nebbins. Dated 9 June 2026. 3 pages, complete. Signed by the line manager.", "Trial period proposal about Siobhan Nebbins. Dated 12 July 2026. 1 page. Signed by the line manager.", "Client or service impact statement about Siobhan Nebbins. Dated 26 May 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 657}} {"id": "isc-te-00241-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Glenside Ltd", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "2 March 2026"}, "checklist": ["Service level summary, issued within the last 12 months", "Corrective action plan, issued within the last 6 months, signed", "Contract compliance checklist, signed", "Supplier performance scorecard, signed", "Invoice discrepancy log"], "submission": {"case": {"name": "Varnridge Partners", "reference": "SE-38332"}, "documents received": ["Supplier performance scorecard - Varnridge Partners.pdf. The document is a supplier performance scorecard about Varnridge Partners, dated 6 February 2026, with 2 pages, complete. It is signed by the category manager.", "Contract compliance checklist - Varnridge Partners.pdf. The document is a contract compliance checklist about Varnridge Partners, dated 30 January 2026, with 3 pages, complete. It is signed by the procurement officer.", "Service level summary - Varnridge Partners.pdf. The document is a service level summary about Varnridge Partners, dated 20 May 2025. It is a single page.", "Delivery record summary - Varnridge Partners.pdf. The document is a delivery record summary about Varnridge Partners, dated 1 August 2025, with 2 pages, complete.", "Bank statement - Varnridge Partners.pdf. The document is a bank statement showing payments made about Varnridge Partners, dated 7 December 2025, with 2 pages, complete.", "Corrective action plan - Varnridge Partners.pdf. The document is a corrective action plan about Varnridge Partners, dated 23 December 2025, with 2 pages, complete. It is signed by the supplier's account manager."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and say whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must concern the subject of the case, all its pages must be present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-0", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 790}} {"id": "isc-te-00378-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Raskgate GmbH", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "1 July 2026"}, "checklist": ["Check that the pack contains a fraud screening result sheet issued within the last 3 months.", "Check that the pack contains a terms of sale acceptance log issued within the last 12 months.", "If the customer claims the item was not as described, also check that the pack contains a product description screenshot archive issued within the last 6 months.", "Check that the pack contains a customer order history extract issued within the last 6 months.", "Check that the pack contains a transaction record printout issued within the last 3 months.", "Check that the pack contains a signature proof of delivery issued within the last 6 months and signed.", "Check that the pack contains a chargeback response form signed."], "submission": {"case": {"name": "disputed transaction VF-44059", "reference": "UL-78187", "details": ["The customer claims the item was not as described."]}, "cover note": "Hi team, please find attached the full pack for reference UL-78187. Everything needed is attached and complete. Best regards, Freya Tadani", "documents received": ["Fraud screening result sheet for disputed transaction VF-44059, dated 28 June 2026. Scanned document, 1 page.", "Terms of sale acceptance log for disputed transaction VF-44059, dated 11 August 2025. Scanned document, 1 page.", "Product description screenshot archive for disputed transaction VF-44059, dated 12 April 2026. 2 pages, complete.", "Transaction record printout for disputed transaction VF-44059, dated 20 June 2026. Scanned document, 1 page.", "Customer order history extract for disputed transaction VF-44059, dated 25 April 2026. 2 pages, complete.", "Chargeback response form for disputed transaction VF-44059, dated 15 June 2026, signed by the payments disputes team lead. 2 pages, complete.", "Signature proof of delivery for disputed transaction VF-44059, dated 24 February 2026. The single page is cropped so that the signature block is cut off, so it is not known whether it is signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "partial", "defect": "signature not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 914}} {"id": "isc-te-00198-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Dunddale Limited", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "8 September 2026"}, "checklist": ["Venue access instructions, issued within the last 3 months", "Payment confirmation, issued within the last 3 months", "Cancellation policy acceptance, signed", "Employer sponsorship letter, issued within the last 3 months, signed", "Delegate photo identification, valid (not expired) on the date of the review", "Course booking form, signed"], "submission": {"case": {"name": "course booking BH-46231", "reference": "KS-57829"}, "documents received": ["Delegate photo identification for course booking BH-46231. Expiry date: 12 June 2028. 1 page.", "Cancellation policy acceptance for course booking BH-46231. Date of issue: 11 August 2026. 1 page. Signed by the delegate.", "Prerequisite certificate for course booking BH-46231. Date of issue: 28 August 2026. 1 page.", "Course booking form for course booking BH-46231. Date of issue: 30 June 2026. 2 pages, complete. Signed by the delegate.", "Payment confirmation for course booking BH-46231. Date of issue: 13 August 2026. 1 page.", "Employer sponsorship letter for course booking BH-46231. Date of issue: 4 September 2026. 1 page. Signed by the employer.", "Venue access instructions for course booking BH-46231. Date of issue: 27 July 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 771}} {"id": "isc-te-00151-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ivrlund BV", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "12 May 2026"}, "checklist": ["Line manager approval, signed.", "Flight itinerary quote, issued within the last 1 months.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Hotel booking confirmation.", "Travel request form, signed.", "If the traveller is not a passport holder of the destination country, also: work permit confirmation.", "Travel policy acknowledgement, signed."], "submission": {"case": {"name": "business trip JP-14209", "reference": "DD-15730", "details": ["The traveller holds a passport of the destination country."]}, "documents received": ["Travel-policy-acknowledgement-JP-14209.pdf. A single-page travel policy acknowledgement for business trip JP-14209, issued on 27 April 2026. It carries the signature of the traveller.", "Hotel-booking-confirmation-JP-14209.pdf. A hotel booking confirmation for business trip JP-14209, issued on 15 March 2026. 2 pages, complete.", "Line-manager-approval-JP-14209.pdf. A single-page line manager approval for business trip JP-14209, issued on 11 April 2026. It carries the signature of the line manager.", "File-002.pdf. The file will not open, so its contents cannot be seen.", "Passport-copy-JP-14209.pdf. A single-page passport copy for international travel for business trip JP-14209, showing an expiry date of 8 December 2027.", "Travel-request-form-JP-14209.pdf. A travel request form for business trip JP-14209, issued on 21 March 2026. 2 pages, complete. It is signed by the traveller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 826}} {"id": "isc-te-00000-p5-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Jorbury Partners", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "17 April 2026"}, "checklist": ["Obtain the signed non-disclosure reminder acknowledgement.", "Obtain the final payroll cut-off note, issued within the last 1 months and signed.", "If the leaver held privileged administrator accounts, also obtain the privileged account revocation certificate, issued within the last 1 months and signed.", "Obtain the service desk ticket closure summary, issued within the last 1 months.", "Obtain the line manager confirmation, issued within the last 1 months and signed."], "submission": {"case": {"name": "Matthias Grubisey", "reference": "TW-20429", "details": ["The leaver held privileged administrator accounts."]}, "cover note": "Hello, apologies for the state of the leaver pack for TW-20429. It was put together in a rush, so please bear with it.", "documents received": ["ndc_reminder_ack_grubisey_28dec2025.pdf — A single-page non-disclosure reminder acknowledgement for Matthias Grubisey, dated 28 December 2025. It is signed by Matthias Grubisey.", "leaver_notification_form_grubisey_9apr2026.pdf — A leaver notification form for Matthias Grubisey, dated 9 April 2026. 2 pages, complete. It is signed by the line manager.", "line_manager_confirmation_grubisey_29mar2026.pdf — A single-page line manager confirmation for Matthias Grubisey, dated 29 March 2026. It is signed by the line manager.", "service_desk_ticket_closure_summary_grubisey_11apr2026.pdf — A service desk ticket closure summary for Matthias Grubisey, dated 11 April 2026. 3 pages, complete.", "final_payroll_cutoff_note_grubisey_2apr2026.pdf — A single-page final payroll cut-off note for Matthias Grubisey, dated 2 April 2026. It is signed by the payroll officer.", "privileged_account_revocation_cert_grubisey_13apr2026.pdf — A single-page privileged account revocation certificate for Matthias Grubisey, dated 13 April 2026. It is signed by the identity and access management team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 927}} {"id": "isc-te-00390-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Abrton Inc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "4 March 2026"}, "checklist": ["If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months and signed", "liability claim form, signed", "public liability insurance schedule", "CCTV footage stills of the incident, issued within the last 3 months", "witness statement from a staff member, signed", "If the injured customer was taken to hospital by ambulance, also: ambulance service record, issued within the last 12 months and signed", "photographs of the spillage on the floor, issued within the last 1 months", "cleaning log for the day of the incident, issued within the last 6 months and signed"], "submission": {"case": {"name": "Marlfeld GmbH", "reference": "IL-48734", "details": ["The customer is handling the claim personally.", "The injured customer did not go to hospital."]}, "documents received": ["public liability insurance schedule - Marlfeld GmbH.pdf. Public liability insurance schedule about Marlfeld GmbH, dated 13 December 2025. 4 pages, complete.", "witness statement from a staff member - Marlfeld GmbH.pdf. Witness statement from a staff member about Marlfeld GmbH, dated 14 January 2026. Single page. Signed by the staff member who made the statement.", "photographs of the spillage on the floor - Marlfeld GmbH.pdf. Photographs of the spillage on the floor about Marlfeld GmbH, dated 16 February 2026. Single page.", "cleaning log for the day of the incident - Marlfeld GmbH.pdf. Cleaning log for the day of the incident about Marlfeld GmbH, dated 12 October 2025. Single page. Signed by the cleaner on duty that day.", "staff training record for the duty manager - Marlfeld GmbH.pdf. Staff training record for the duty manager about Marlfeld GmbH, dated 28 February 2026. 2 pages, complete. Signed by the duty manager.", "CCTV footage stills of the incident - Marlfeld GmbH.pdf. CCTV footage stills of the incident about Marlfeld GmbH, dated 25 December 2025. 2 pages, complete.", "liability claim form - Marlfeld GmbH.pdf. Liability claim form about Marlfeld GmbH, dated 10 December 2025. 3 pages, complete. Signed by the customer."]}}, "question": {"type": "choice", "instructions": "Does the pack fully satisfy the checklist? Check every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Do not trust cover notes and labels blindly, as they may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-73", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 956}} {"id": "isc-te-00061-p1-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pelllund Partners", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "24 July 2026"}, "checklist": ["Quality inspection report, issued within the last 6 months and signed", "Supplier performance scorecard, signed", "Corrective action plan, issued within the last 6 months and signed", "If the supplier is being considered for an expanded scope, also: expanded scope assessment memo, signed", "If the supplier missed the agreed service levels, also: service credit request form, signed", "Service level summary, issued within the last 12 months", "Contract compliance checklist, signed", "Delivery record summary, issued within the last 12 months"], "submission": {"case": {"name": "Pravheim Limited", "reference": "ZV-43025", "details": ["The supplier is being considered for an expanded scope.", "The supplier met all agreed service levels."]}, "documents received": ["Delivery record summary about Pravheim Limited, dated 12 October 2025. 2 pages, complete.", "Service level summary about Pravheim Limited, dated 10 February 2026. Single page.", "Contract compliance checklist about Pravheim Limited, dated 8 July 2026. 3 pages, complete. Signed by the contract manager.", "General factory tour handout about Pravheim Limited, dated 25 February 2026. 3 pages, complete. Signed by the site tour coordinator.", "Expanded scope assessment memo about Pravheim Limited, dated 6 May 2026. 2 pages, complete. Signed by the procurement manager.", "Corrective action plan about Pravheim Limited, dated 21 April 2026. 2 pages, complete. Signed by the supplier quality lead.", "Supplier performance scorecard about Pravheim Limited, dated 13 June 2026. 2 pages, complete. Signed by the supplier relationship manager."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and say whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must concern the subject of the case, all its pages must be present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-0", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 817}} {"id": "isc-te-00055-p4-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Pellby Group", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "19 June 2026"}, "checklist": ["Gifted deposit letter, issued within the last 3 months and signed", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months and signed", "Proof of deposit savings, issued within the last 3 months", "P60 tax summary, issued within the last 15 months", "Property valuation report, issued within the last 3 months and signed", "Mortgage application form, issued within the last 3 months and signed", "Three most recent payslips, issued within the last 3 months"], "submission": {"case": {"name": "Tyler Ebbaker", "reference": "JB-96407", "details": ["The borrower is self-employed."]}, "documents received": ["property_valuation_report.pdf. A property valuation report concerning Tyler Ebbaker, dated 31 May 2026. 8 pages, complete. It has been signed by the surveyor who carried out the valuation.", "gifted_deposit_letter.pdf. A gifted deposit letter concerning Tyler Ebbaker, dated 5 April 2026. It is a single page and has been signed by the donor of the gift.", "mortgage_application_form.pdf. A mortgage application form concerning Tyler Ebbaker, dated 7 May 2026. 10 pages, complete. It has been signed by the applicant.", "tax_year_overviews.pdf. Two most recent tax year overviews concerning Tyler Ebbaker, dated 12 December 2025. 4 pages, complete. They have been signed by HM Revenue and Customs.", "payslips.pdf. Three most recent payslips concerning Tyler Ebbaker, dated 14 June 2026. 3 pages, complete.", "proof_of_deposit_savings.pdf. A proof of deposit savings concerning Tyler Ebbaker, dated 3 May 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Your task is to decide whether the pack stands complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-40", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 835}} {"id": "isc-te-00304-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Stervgard Ltd", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "20 March 2026"}, "checklist": ["Check that the engineer's fault diagnosis report is included, that it was issued within the last 3 months, and that it is signed.", "If the breakdown spoiled perishable stock, also check that the spoiled stock disposal certificate is included, that it was issued within the last 3 months, and that it is signed.", "Check that the policy machinery schedule is included.", "Check that the production downtime log is included, that it was issued within the last 3 months, and that it is signed.", "Check that photographs of the failed component are included.", "Check that the purchase invoice for the machine is included."], "submission": {"case": {"name": "failed machine VU-78923", "reference": "UW-19124", "details": ["The breakdown spoiled perishable stock."]}, "documents received": ["photographs_failed_component_VU-78923.pdf. This set of photographs of the failed component relates to failed machine VU-78923 and is dated 14 March 2026. It has 2 pages, complete.", "engineer_fault_diagnosis_report_VU-78923.pdf. This engineer's fault diagnosis report covers failed machine VU-78923 and is dated 14 January 2026. It has 4 pages, complete, and is signed by the attending engineer.", "production_downtime_log_VU-78923.pdf. This production downtime log covers failed machine VU-78923 and is dated 18 February 2026. It has 2 pages, complete, and is signed by the production supervisor.", "equipment_breakdown_claim_form_VU-78923.pdf. This equipment breakdown claim form covers failed machine VU-78923 and is dated 12 December 2025. It has 3 pages, complete, and is signed by the policyholder's representative.", "policy_machinery_schedule_VU-78923.pdf. This policy machinery schedule covers failed machine VU-78923 and is dated 26 November 2025. It has 3 pages, complete.", "purchase_invoice_machine_VU-78923.pdf. This purchase invoice for the machine relates to failed machine VU-78923 and is dated 26 January 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 938}} {"id": "isc-te-00419-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Quelmere Inc", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "23 June 2026"}, "checklist": ["Passport, valid (not expired) on the date of the review: 23 June 2026.", "Three months of bank statements, issued within the last 3 months.", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months, signed.", "Mortgage application form, issued within the last 3 months, signed.", "Gifted deposit letter, issued within the last 3 months, signed."], "submission": {"case": {"name": "Freya Moskwick", "reference": "QS-74483", "details": ["The borrower is not self-employed."]}, "documents received": ["proof_of_deposit_savings_moskwick.pdf - Proof of deposit savings for Freya Moskwick. It shows a date of issue of 12 May 2026. 2 pages, complete.", "gifted_deposit_letter_moskwick.pdf - Gifted deposit letter for Freya Moskwick. It shows a date of issue of 17 May 2026. It is a single page. It is signed by the donor of the gift.", "passport_moskwick.pdf - Passport for Freya Moskwick. It shows an expiry date of 21 August 2027. 2 pages, complete.", "bank_statements_moskwick.pdf - Three months of bank statements for Freya Moskwick. They show a date of issue of 14 April 2026. 9 pages, complete.", "mortgage_application_form_moskwick.pdf - Mortgage application form for Freya Moskwick. It shows a date of issue of 2 April 2026. 10 pages, complete. It is signed by the borrower, Freya Moskwick.", "p60_tax_summary_moskwick.pdf - P60 tax summary for Freya Moskwick. It shows a date of issue of 25 September 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 843}} {"id": "isc-te-00136-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Tondside Partners", "reviewer": "the quality manager and site management review board", "pack": "internal audit evidence pack", "purpose": "to support the audit findings at the management review", "date of the review": "12 May 2026"}, "checklist": ["Previous audit follow-up record, issued within the last 24 months, signed.", "If the audit covered the calibration laboratory, also: calibration laboratory records sample list, signed.", "Audit finding sheets, signed.", "Audit interview notes, signed.", "Management review minutes, signed.", "Audit checklist for each area visited, signed.", "Internal audit plan, issued within the last 12 months, signed."], "submission": {"case": {"name": "internal audit MX-72526", "reference": "LS-20464", "details": ["The audit did not cover the calibration laboratory."]}, "documents received": ["Previous audit follow-up record - MX-72526.pdf. The record relates to internal audit MX-72526 and is dated 23 September 2025. It runs to 2 pages, complete, and is signed by the lead auditor.", "Audit checklist for each area visited - MX-72526.pdf. The checklists relate to internal audit MX-72526 and are dated 2 April 2026. They run to 4 pages, complete, and are signed by the auditor for each area.", "Internal audit plan - MX-72526.pdf. The plan covers internal audit MX-72526 and is dated 14 August 2025. It runs to 2 pages, complete, and is signed by the quality manager.", "Job interview record for a new hire - MX-72526.pdf. The record relates to a job interview for a new hire connected with internal audit MX-72526 and is dated 10 February 2026. It runs to 3 pages, complete, and is signed by the hiring supervisor.", "Audit summary report - MX-72526.pdf. The report summarises internal audit MX-72526 and is dated 23 April 2026. It runs to 5 pages, complete, and is signed by the lead auditor.", "Audit finding sheets - MX-72526.pdf. The sheets cover internal audit MX-72526 and show a date of issue of 22 January 2026. They run to 2 pages, complete, and are signed by the lead auditor.", "Management review minutes - MX-72526.pdf. The minutes concern internal audit MX-72526 and are dated 20 February 2026. They run to 4 pages, complete, and are signed by the chair of the review board."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "internal audit evidence pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 979}} {"id": "isc-te-00095-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Maldcrest Limited", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "25 June 2026"}, "checklist": ["Trip itinerary and approval, issued within the last 3 months and signed", "Travel policy extract showing advance eligibility", "Employee bank detail confirmation, issued within the last 6 months and signed", "Line manager approval for the advance, signed", "Costed trip estimate sheet, issued within the last 3 months and signed", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Omar Ebbski", "reference": "GH-37714"}, "documents received": ["Costed trip estimate sheet for Omar Ebbski. Date of issue: 15 May 2026. 1 page. Signed by the line manager.", "Payroll deduction agreement for recovery of the advance for Omar Ebbski. Date of issue: 7 April 2026. 1 page. Signed by the employee.", "Travel policy extract showing advance eligibility for Omar Ebbski. Date of issue: 21 May 2026. 1 page.", "Line manager approval for the advance for Omar Ebbski. Date of issue: 4 March 2026. 1 page. Signed by the line manager.", "Employee bank detail confirmation for Omar Ebbski. Date of issue: 6 January 2026. 1 page. Signed by the employee.", "Outstanding advance clearance check for Omar Ebbski. Date of issue: 5 June 2026. 1 page. Signed by the accounts payable team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 740}} {"id": "isc-te-00285-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Glenvik Group", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "17 March 2026"}, "checklist": ["Check that the tax registration letter is included.", "Check that the bank account verification letter is included, that it was issued within the last 3 months, and that it is signed.", "Check that the authorised representative ID copy is included and that it is valid, meaning not expired, on the date of the review.", "Check that the product catalogue declaration is included and that it is signed.", "Check that the proof of trading address is included and that it was issued within the last 3 months.", "Check that the business registration certificate is included."], "submission": {"case": {"name": "Bolthurst Ltd", "reference": "KL-47468"}, "documents received": ["Authorised representative ID copy for Bolthurst Ltd, showing an expiry date of 20 December 2026. Single page.", "Proof of trading address for Bolthurst Ltd, dated 10 March 2026. Single page.", "Bank account verification letter for Bolthurst Ltd, dated 5 January 2026. Signed by a bank officer. Single page.", "Tax registration letter for Bolthurst Ltd, dated 7 March 2026. Single page.", "Business registration certificate for Bolthurst Ltd, dated 12 December 2025. Single page.", "Product catalogue declaration for Bolthurst Ltd, dated 30 November 2025. 4 pages, complete. Signed by the authorised representative."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 726}} {"id": "isc-te-00124-p3-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Gravside LLP", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "20 May 2026"}, "checklist": ["Check the pack includes the public liability insurance schedule.", "Check the pack includes the signed liability claim form.", "Check the pack includes the cleaning log for the day of the incident, issued within the last 6 months and signed.", "If the injured customer was taken to hospital by ambulance, also: check the pack includes the ambulance service record, issued within the last 12 months and signed.", "Check the pack includes the staff training record for the duty manager, issued within the last 24 months and signed.", "Check the pack includes the incident report from the day, issued within the last 3 months and signed.", "Check the pack includes the witness statement from a staff member, signed."], "submission": {"case": {"name": "Marlburg SAS", "reference": "LR-18403", "details": ["The injured customer did not go to hospital."]}, "documents received": ["liability_claim_form_Marlburg_SAS.pdf. Liability claim form for Marlburg SAS, dated 14 May 2026, signed by the claimant. 3 pages, complete.", "photographs_spillage_floor_Marlburg_SAS.pdf. Photographs of the spillage on the floor for Marlburg SAS, dated 1 May 2026. Single page.", "witness_statement_staff_member_Marlburg_SAS.pdf. Witness statement from a staff member for Marlburg SAS, dated 8 April 2026, signed by the staff member. Single page.", "staff_training_record_duty_manager_Marlburg_SAS.pdf. Staff training record for the duty manager for Marlburg SAS, dated 14 January 2025, signed by the duty manager. 2 pages, complete.", "cleaning_log_day_of_incident_Marlburg_SAS.pdf. Cleaning log for the day of the incident for Marlburg SAS, dated 26 December 2025, signed by the cleaner. Single page.", "public_liability_insurance_schedule_Marlburg_SAS.pdf. Public liability insurance schedule for Marlburg SAS, dated 19 February 2026. 4 pages, complete.", "incident_report_Marlburg_SAS.pdf. Incident report from the day for Marlburg SAS, dated 8 May 2026, signed by the duty manager. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 914}} {"id": "isc-te-00472-p1-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lombcliff Partners", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "3 August 2026"}, "checklist": ["Risk assessment for the task, issued within the last 3 months and signed.", "Cost estimate, issued within the last 3 months and signed.", "If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Access authorisation slip, signed.", "Photographs of the fault, issued within the last 3 months.", "Parts order confirmation, issued within the last 1 months."], "submission": {"case": {"name": "maintenance request XO-61833", "reference": "IR-85731", "details": ["The job involves no work at height above two metres."]}, "documents received": ["Photographs of the fault for maintenance request XO-61833, dated 19 July 2026. 2 pages, complete.", "Parts order confirmation for maintenance request XO-61833, dated 18 July 2026. Single page.", "Cost estimate for maintenance request XO-61833, dated 1 June 2026. 2 pages, complete. Signed by the estimating officer.", "Access authorisation slip for maintenance request XO-61833, dated 6 July 2026. Single page. Signed by the access controller.", "Planned completion date sheet for maintenance request XO-61833, dated 11 April 2026. Single page. Signed by the planning coordinator.", "Parts order confirmation for maintenance request XO-61833, dated 1 August 2025. Single page.", "Risk assessment for the task on maintenance request XO-61833, dated 4 June 2026. 5 pages, complete. Signed by the assessing supervisor."]}}, "question": {"type": "choice", "instructions": "Is this pack complete when measured against the checklist? Go line by line through every checklist item relevant to this case. To count, a required document must be the kind of document listed (a similar kind will not do), be about the subject of the case, have all its pages present, be signed wherever the checklist asks for a signature, not be expired on the date of the review, and have been issued during the period the checklist allows. A conditional line applies only where its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is unmet. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, such as a needed date, signature or page count not being visible, a document's kind being impossible to tell, or the case details not saying whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-7", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 814}} {"id": "isc-te-00089-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Fravwyn Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "16 July 2026"}, "checklist": ["Special requests note, signed", "Booking request form, signed", "Flight availability printout, issued within the last 1 months", "Passport details form, signed", "Travel insurance quote, issued within the last 1 months", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review", "Customer deposit receipt, issued within the last 3 months"], "submission": {"case": {"name": "holiday booking DO-39970", "reference": "NL-53165", "details": ["The booking includes a child traveller."]}, "documents received": ["Booking request form DO-39970. Issued 23 April 2026. 2 pages, complete, signed by the customer.", "Passport details form DO-39970. Issued 15 June 2026. 1 page, signed by the customer.", "Customer deposit receipt DO-39970. Issued 19 May 2026. 1 page.", "Travel insurance quote DO-39970. Issued 8 July 2026. 2 pages, complete.", "Hotel availability printout DO-39970. Issued 12 July 2026. 2 pages, complete, signed by the reservations agent.", "Flight availability printout DO-39970. Issued 8 July 2026. 2 pages, complete.", "Special requests note DO-39970. Issued 17 June 2026. 1 page, signed by the customer.", "Package holiday brochure page DO-39970. Issued 29 March 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00366-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Jorcrest Ltd", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "26 June 2026"}, "checklist": ["Outstanding advance clearance check, signed.", "Travel policy extract showing advance eligibility.", "Travel advance request form, signed.", "Costed trip estimate sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "Marek Arnwick", "reference": "WD-60422"}, "documents received": ["Costed trip estimate sheet for Marek Arnwick, dated 9 June 2026, one page. It is signed by Marek Arnwick.", "Outstanding advance clearance check for Marek Arnwick, dated 26 April 2026, one page. It is signed by the accounts payable reviewer.", "Travel policy extract showing advance eligibility for Marek Arnwick, dated 9 April 2026, one page.", "Travel advance request form for Marek Arnwick, dated 26 March 2026, one page. It is signed by Marek Arnwick.", "Personal loan application to a bank for Marek Arnwick, dated 26 March 2026, one page. It is signed by Marek Arnwick."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 657}} {"id": "isc-te-00428-p3-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Jundwyn BV", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "10 March 2026"}, "checklist": ["Benefit claim form, valid (not expired) on the date of the review, signed", "Proof of national insurance number", "If the claimant has a non-dependant adult living in the household, also: non-dependant income details form, signed", "Current tenancy agreement, signed", "Recent bank statements, issued within the last 2 months"], "submission": {"case": {"name": "Alice Ostock", "reference": "MD-67214", "details": ["The claimant has a non-dependant adult living in the household."]}, "documents received": ["non-dependant-income_ostock.pdf. Non-dependant income details form about Alice Ostock, issued 3 February 2026. 2 pages, complete. Signed by the non-dependant.", "bank-statements_ostock.pdf. Recent bank statements about Alice Ostock, issued 20 January 2026. 12 pages, complete.", "earnings-proof_ostock.pdf. Proof of earnings about Alice Ostock, issued 28 February 2026. 2 pages, complete.", "ni-proof_ostock.pdf. Proof of national insurance number about Alice Ostock, issued 3 January 2026. It is a single page.", "tenancy-agreement_ostock.pdf. Current tenancy agreement about Alice Ostock, issued 31 December 2025. 12 pages, complete. Signed by the landlord.", "claim-form_ostock_v3.pdf. Benefit claim form about Alice Ostock, expiring 10 February 2027. 12 pages, complete. Signed by the claimant.", "id-proof_ostock.pdf. Proof of identity about Alice Ostock, expiring 5 September 2027. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "partial", "defect": "all pages present", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 803}} {"id": "isc-te-00321-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Elstheim & Co", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "25 March 2026"}, "checklist": ["Two-factor authentication confirmation, issued within the last 3 months", "Account purpose statement", "Account closure procedure", "If the account will be run by an external agency, also: agency access agreement, signed", "Platform terms acceptance record, signed", "Naming convention approval, signed", "Account request form, signed"], "submission": {"case": {"name": "new social media account XI-38854", "reference": "TG-11955", "details": ["The account will be run entirely by in-house staff."]}, "cover note": "Everything needed for this pack is attached and complete. Please review it at your convenience.", "documents received": ["file_0093.pdf — The file will not open, so its contents cannot be seen.", "account_request_form_XI-38854.pdf — An account request form for new social media account XI-38854, dated 19 January 2026. It is signed by the requesting marketing manager and is a single page.", "account_purpose_statement_XI-38854.pdf — An account purpose statement for new social media account XI-38854, dated 3 March 2026. It is a single page.", "platform_terms_acceptance_record_XI-38854.pdf — A platform terms acceptance record for new social media account XI-38854, dated 31 January 2026. It is signed by the account owner and is a single page.", "naming_convention_approval_XI-38854.pdf — A naming convention approval for new social media account XI-38854, dated 15 March 2026. It is signed by the brand governance lead and is a single page.", "account_closure_procedure_XI-38854.pdf — An account closure procedure for new social media account XI-38854, dated 7 December 2025. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 851}} {"id": "isc-te-00287-p2-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Fervburg SAS", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "27 April 2026"}, "checklist": ["Confirm the pack contains the chargeback response form, signed.", "If the goods were delivered to an address different from the billing address, also include the address verification check report, issued within the last 3 months.", "Confirm the pack contains the terms of sale acceptance log, issued within the last 12 months.", "Confirm the pack contains the customer order history extract, issued within the last 6 months.", "Confirm the pack contains the transaction record printout, issued within the last 3 months."], "submission": {"case": {"name": "disputed transaction TL-11034", "reference": "MA-40092", "details": ["The goods were delivered to the billing address."]}, "documents received": ["Chargeback response form for disputed transaction TL-11034, dated 4 April 2026. 2 pages, complete. The form is signed by the payments disputes team lead.", "Customer order history extract for disputed transaction TL-11034, dated 26 February 2026. 2 pages, complete.", "Transaction record printout for disputed transaction TL-11034, dated 25 April 2026. Single page.", "Terms of sale acceptance log for disputed transaction TL-11034. The date of issue is smudged and cannot be read. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 709}} {"id": "isc-te-00151-p5-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ivrlund BV", "reviewer": "the travel coordinator", "pack": "employee travel booking file", "purpose": "before the trip is confirmed and tickets are issued", "date of the review": "12 May 2026"}, "checklist": ["Line manager approval, signed.", "Flight itinerary quote, issued within the last 1 months.", "Passport copy for international travel, valid (not expired) on the date of the review.", "Hotel booking confirmation.", "Travel request form, signed.", "If the traveller is not a passport holder of the destination country, also: work permit confirmation.", "Travel policy acknowledgement, signed."], "submission": {"case": {"name": "business trip JP-14209", "reference": "DD-15730", "details": ["The traveller holds a passport of the destination country."]}, "cover note": "Could you please approve this quickly? All the paperwork is in order.", "documents received": ["File-002.pdf. The file will not open, so its contents cannot be seen.", "Travel-policy-acknowledgement-JP-14209.pdf. A single-page travel policy acknowledgement for business trip JP-14209, issued on 27 April 2026. It carries the signature of the traveller.", "Travel-request-form-JP-14209.pdf. A travel request form for business trip JP-14209, issued on 21 March 2026. 2 pages, complete. It is signed by the traveller.", "Hotel-booking-confirmation-JP-14209.pdf. A hotel booking confirmation for business trip JP-14209, issued on 15 March 2026. 2 pages, complete.", "Line-manager-approval-JP-14209.pdf. A single-page line manager approval for business trip JP-14209, issued on 11 April 2026. It carries the signature of the line manager.", "Passport-copy-JP-14209.pdf. A single-page passport copy for international travel for business trip JP-14209, showing an expiry date of 8 December 2027.", "Visa-entry-requirement-printout-JP-14209.pdf. A visa entry requirement printout for business trip JP-14209, issued on 1 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "employee travel booking file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 910}} {"id": "isc-te-00118-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Wynshaw Ltd", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "4 August 2026"}, "checklist": ["Witness list, signed.", "Investigator appointment letter, issued within the last 3 months.", "Evidence bundle index, signed.", "Adjustment request record, issued within the last 3 months, signed.", "Previous grievance outcome letter, issued within the last 24 months.", "Meeting invitation with rights explained, issued within the last 1 months."], "submission": {"case": {"name": "Sanne Ingson", "reference": "PI-43445"}, "documents received": ["Written grievance statement dated 22 April 2026 concerning Sanne Ingson. It is 3 pages, complete, and is signed by Sanne Ingson.", "Adjustment request record dated 16 July 2026 concerning Sanne Ingson. It is 1 page and is signed by the HR adviser.", "Grievance procedure acknowledgement dated 5 July 2026 concerning Sanne Ingson. It is 1 page and is signed by Sanne Ingson.", "Evidence bundle index dated 11 June 2026 concerning Sanne Ingson. It is 2 pages, complete, and is signed by the case administrator.", "Investigator appointment letter dated 28 May 2026 concerning Sanne Ingson. It is 1 page.", "Witness list dated 25 April 2026 concerning Sanne Ingson. It is 1 page and is signed by the investigating officer.", "Previous grievance outcome letter dated 3 October 2024 concerning Sanne Ingson. Only pages 1-1 of 2 are included.", "Meeting invitation with rights explained dated 24 July 2026 concerning Sanne Ingson. It is 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 787}} {"id": "isc-te-00414-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Iskton Ltd", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "23 June 2026"}, "checklist": ["Admin access list, issued within the last 3 months", "Naming convention approval, signed", "Content escalation route, signed", "Account purpose statement", "If the account will be run by an external agency, also: agency access agreement, signed", "Two-factor authentication confirmation, issued within the last 3 months", "Account request form, signed"], "submission": {"case": {"name": "new social media account PU-30947", "reference": "OO-86849", "details": ["The account will be run by an external agency."]}, "cover note": "My colleague has already checked this pack, so it should be straightforward to review.", "documents received": ["Content escalation route PU-30947.pdf. This is the content escalation route for new social media account PU-30947, dated 29 March 2026. It is a single page and is signed by the Social Media Manager.", "Naming convention approval PU-30947.pdf. This is the naming convention approval for new social media account PU-30947, dated 6 June 2026. It is a single page and is signed by the Head of Social Media.", "Platform terms acceptance record PU-30947.pdf. This is the platform terms acceptance record for new social media account PU-30947, dated 25 May 2026. It is a single page and is signed by the Social Media Governance Lead.", "Admin access list PU-30947.pdf. This is the admin access list for new social media account PU-30947, dated 19 April 2026. It is a single page.", "Account request form PU-30947.pdf. This is the account request form for new social media account PU-30947, dated 26 March 2026. It is a single page and is signed by the Marketing Director.", "Two-factor authentication confirmation PU-30947.pdf.This is the two-factor authentication confirmation for new social media account PU-30947, dated 16 April 2026. It is a single page.", "Account purpose statement PU-30947.pdf. This is the account purpose statement for new social media account PU-30947, dated 4 April 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 942}} {"id": "isc-te-00173-p5-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Belmhall Ltd", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "20 August 2026"}, "checklist": ["Check that the pack contains an incident timeline issued no more than 3 months ago.", "Check that the pack contains postmortem meeting minutes issued no more than 3 months ago and signed.", "Check that the pack contains a root cause analysis report issued no more than 3 months ago and signed.", "Check that the pack contains an alerting rules review note issued no more than 3 months ago."], "submission": {"case": {"name": "production incident FN-18440", "reference": "PK-62381"}, "cover note": "Apologies for the rush in putting this pack together. Please take a look and tell me if anything needs another pass.", "documents received": ["Postmortem meeting minutes for production incident FN-18440, date of issue 10 August 2026. 3 pages, complete. Signed by the meeting chair.", "Root cause analysis report for production incident FN-18440, date of issue 29 June 2026. 5 pages, complete. Signed by the lead reliability engineer.", "Alerting rules review note for production incident FN-18440, date of issue 14 July 2026. 2 pages, complete.", "Remediation items list for production incident FN-18440, date of issue 31 July 2026. 2 pages, complete. Signed by the remediation lead.", "Incident timeline for production incident FN-18440, date of issue 13 August 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 764}} {"id": "isc-te-00434-p3-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Quelbrook SAS", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "29 April 2026"}, "checklist": ["Experiment safety clearance form, signed, is included.", "Home institution endorsement letter, issued within the last 6 months and signed, is included.", "Radiation safety training certificate, issued within the last 24 months and signed, is included.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed, is included.", "Host scientist invitation letter, issued within the last 6 months and signed, is included.", "Photo identity document, valid (not expired) on the date of the review, is included."], "submission": {"case": {"name": "Rory Tibeau", "reference": "TW-86879", "details": ["The researcher will work outside standard opening hours."]}, "documents received": ["facility_access_application_form_Tibeau.pdf - Facility access application form for Rory Tibeau, dated 6 February 2026. 2 pages, complete. Signed by the applicant.", "host_scientist_invitation_letter_Tibeau.pdf - Host scientist invitation letter for Rory Tibeau, dated 12 April 2026. 1 page. Signed by the host scientist.", "photo_identity_document_Tibeau.pdf - Photo identity document for Rory Tibeau, expiring 3 December 2026. 1 page.", "home_institution_endorsement_letter_Tibeau.pdf - Home institution endorsement letter for Rory Tibeau, dated 27 November 2025. 1 page. Signed by the home institution registrar.", "radiation_safety_training_certificate_Tibeau.pdf - Radiation safety training certificate for Rory Tibeau, dated 14 June 2025. 1 page. Signed by the radiation protection officer.", "insurance_declaration_facility_work_Tibeau.pdf - Insurance declaration for facility work for Rory Tibeau, dated 25 June 2025. 1 page. Signed by the home institution insurance officer.", "experiment_safety_clearance_form_Tibeau.pdf - Experiment safety clearance form for Rory Tibeau, dated 15 April 2026. 3 pages, complete. Signed by the facility safety officer."]}}, "question": {"type": "choice", "instructions": "The task is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-51", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 892}} {"id": "isc-te-00266-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Wilmwyn Limited", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "30 April 2026"}, "checklist": ["Check that the pack contains a hotel invoice issued within the last 6 months.", "If the claim exceeds the limit that requires director sign-off, also check that the pack contains a director approval slip issued within the last 3 months and signed.", "Check that the pack contains a restaurant receipt issued within the last 6 months.", "Check that the pack contains a taxi fare receipt issued within the last 6 months.", "Check that the pack contains a currency conversion statement issued within the last 6 months."], "submission": {"case": {"name": "Xiu Knoxova", "reference": "HF-82888", "details": ["The claim is below the limit requiring director sign-off."]}, "documents received": ["Train ticket receipt for Xiu Knoxova. Date of issue: 26 January 2026.", "Restaurant receipt for Xiu Knoxova. Date of issue: 29 December 2025. 1 page.", "Paper napkin with the total written on it for Xiu Knoxova. Date of issue: 29 December 2025. 1 page.", "Conference fee invoice for Xiu Knoxova. Date of issue: 7 July 2025. 1 page.", "File name: scan_009.pdf. The file will not open, so its contents cannot be seen.", "Currency conversion statement for Xiu Knoxova. Date of issue: 22 March 2026. 1 page.", "Hotel invoice for Xiu Knoxova. Date of issue: 14 November 2025. 2 pages, complete.", "Taxi fare receipt for Xiu Knoxova. Date of issue: 27 January 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "wrong", "defect": "right document plus a similar wrong one, plus an unreadable extra file", "n_lines": 5, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 798}} {"id": "isc-te-00269-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Quorton BV", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "9 April 2026"}, "checklist": ["Check that the vehicle condition report is signed.", "Check that the passport is valid (not expired) on the date of the review and signed.", "Check that the fuel policy sheet is signed.", "Check that the insurance excess waiver certificate is valid (not expired) on the date of the review.", "If the named driver is under 25 years old, also check the young driver surcharge agreement is signed."], "submission": {"case": {"name": "Sabine Vintwell", "reference": "QB-43148", "details": ["The named driver is under 25 years old."]}, "documents received": ["passport.pdf — A passport for Sabine Vintwell with the expiry date 19 April 2027. It is a single page. It is signed by the passport holder.", "credit_card_in_drivers_name.pdf — A credit card in the driver's name for Sabine Vintwell with the expiry date 19 December 2027. It is a single page. It is signed by the cardholder.", "insurance_excess_waiver_certificate.pdf — An insurance excess waiver certificate for Sabine Vintwell with the expiry date 2 March 2027. 2 pages, complete.", "vehicle_condition_report.pdf — A vehicle condition report for Sabine Vintwell, dated 6 January 2026. 2 pages, complete. It is signed by the rental branch counter staff member who inspected the car.", "fuel_policy_sheet.pdf — A fuel policy sheet for Sabine Vintwell, dated 7 February 2026. It is a single page. It is signed by the named driver."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 766}} {"id": "isc-te-00230-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Stromheim Partners", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "18 September 2026"}, "checklist": ["Waste disposal plan: confirm it is included.", "If the kit includes an electrical display unit, also: electrical safety test certificate issued within the last 12 months, confirm it is included.", "Kit contents list: confirm it is included.", "Brand colour specification: confirm it is included.", "Kit cost breakdown issued within the last 3 months and signed: confirm it is included."], "submission": {"case": {"name": "merchandising kit QI-72418", "reference": "QU-47115", "details": ["The kit includes an electrical display unit."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["Brand colour specification for merchandising kit QI-72418. Date of issue: 5 July 2026. 1 page.", "Kit contents list for merchandising kit QI-72418. Date of issue: 30 June 2026. 2 pages, complete.", "Kit cost breakdown for merchandising kit QI-72418. Date of issue: 3 July 2026. 2 pages, complete. Signed by the finance manager.", "Waste disposal plan for merchandising kit QI-72418. Date of issue: 31 July 2026. 1 page.", "Electrical safety test certificate for merchandising kit QI-72418. Date of issue: 21 July 2026. 1 page.", "Shipping manifest for merchandising kit QI-72418. Date of issue: 4 September 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete when measured against the checklist. Go over every checklist line relevant to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, contain all its pages, carry a signature wherever the checklist asks for one, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': all applicable lines are met (extra documents do not matter). 'incomplete': at least one applicable line is unmet. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-45", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 811}} {"id": "isc-te-00316-p4-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Weskwell Inc", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "2 July 2026"}, "checklist": ["Previous audit findings closure file (signed)", "Layout tour plan (signed)", "Audit agenda (signed)", "If the customer auditor requests access to sub-tier supplier records, also: sub-tier supplier records summary (issued within the last 3 months, signed)", "Calibration status summary (issued within the last 1 months, signed)", "Open corrective action list (issued within the last 1 months, signed)"], "submission": {"case": {"name": "customer audit visit YP-49316", "reference": "TE-85611", "details": ["The customer auditor requests access to sub-tier supplier records."]}, "documents received": ["Layout tour plan for customer audit visit YP-49316, dated 28 March 2026. Single page. Signed by the quality management office manager.", "Open corrective action list for customer audit visit UJ-13607, dated 28 June 2026. 2 pages, complete. Signed by the quality management office manager.", "Audit scope statement for customer audit visit YP-49316, dated 13 April 2026. Single page. Signed by the quality management office manager.", "Audit agenda for customer audit visit YP-49316, dated 4 June 2026. Single page. Signed by the quality management office manager.", "Calibration status summary for customer audit visit YP-49316, dated 25 June 2026. 2 pages, complete. Signed by the metrology manager.", "Previous audit findings closure file for customer audit visit YP-49316, dated 5 May 2026. 6 pages, complete. Signed by the quality management office manager.", "Sub-tier supplier records summary for customer audit visit YP-49316, dated 16 May 2026. 3 pages, complete. Signed by the purchasing manager."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 656}} {"id": "isc-te-00256-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Mersfell BV", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "29 May 2026"}, "checklist": ["Include the original complaint record, issued within the last 6 months.", "Include the goodwill gesture approval note, issued within the last 1 months and signed.", "Include the proposed resolution letter draft, signed.", "Include the customer contact log, issued within the last 3 months.", "Include the policy breach summary, issued within the last 3 months and signed.", "Include the complaint escalation form, issued within the last 1 months and signed."], "submission": {"case": {"name": "escalated complaint SD-98346", "reference": "GZ-99079"}, "documents received": ["SD-98346_original_complaint_record.pdf - Original complaint record for escalated complaint SD-98346. Date of issue: 24 April 2026. 2 pages, complete.", "SD-98346_goodwill_gesture_approval_note.pdf - Goodwill gesture approval note for escalated complaint SD-98346. Date of issue: 14 May 2026. Single page, signed by the Customer Relations Manager.", "SD-98346_complaint_escalation_form.pdf - Complaint escalation form for escalated complaint SD-98346. Date of issue: 26 May 2026. 2 pages, complete, signed by the Customer Relations Manager.", "File_ref_09.pdf - The scan is blank, so its contents cannot be seen.", "SD-98346_policy_breach_summary.pdf - Policy breach summary for escalated complaint SD-98346. Date of issue: 1 May 2026. 2 pages, complete, signed by the Compliance Officer.", "SD-98346_proposed_resolution_letter_draft.pdf - Proposed resolution letter draft for escalated complaint SD-98346. Date of issue: 22 May 2026. 2 pages, complete, signed by the Customer Relations Manager.", "SD-98346_store_incident_report.pdf - Store incident report for escalated complaint SD-98346. Date of issue: 2 April 2026. 2 pages, complete, signed by the Store Manager."]}}, "question": {"type": "choice", "instructions": "You must judge if the pack is complete relative to the checklist. Review each line of the checklist that has relevance to this case. To count, a required document must match the kind of document the checklist specifies (a similar one will not do), must relate to the subject of the case, must include all its pages, must be signed wherever the checklist calls for a signature, must still be valid on the review date (that is, not expired), and must have been issued during the period the checklist permits. A conditional line binds the case only if the circumstance it describes actually holds. complete: all applicable lines are satisfied, and extra documents are of no consequence. incomplete: at least one applicable line fails. unclear: no line fails outright, but at least one cannot be decided on the basis of what is displayed, for example a necessary date, signature or page count is not visible, the kind of a document cannot be told, or the case details are silent on whether a conditional line's circumstance holds while that line's document is missing. Do not rely on cover notes or labels, which may mislead; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "wrong", "defect": "document whose kind cannot be told", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-52", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 929}} {"id": "isc-te-00050-p5-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Wilmmouth Ltd", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "19 June 2026"}, "checklist": ["Account purpose statement is included.", "Signed platform terms acceptance record is included.", "Signed account request form is included.", "Two-factor authentication confirmation is included, issued within the last 3 months.", "If the account will post content about financial products, also: financial promotions approval note, issued within the last 3 months and signed."], "submission": {"case": {"name": "new social media account JE-72058", "reference": "TC-88544", "details": ["The account will not post any content about financial products."]}, "documents received": ["Two-factor authentication confirmation for new social media account JE-72058. Dated 10 June 2026. Single page.", "Admin access list for new social media account JE-72058. Dated 19 May 2026. Single page.", "Platform terms acceptance record for new social media account JE-72058. Dated 17 April 2026 and signed by the social media manager. Single page.", "Account purpose statement for new social media account JE-72058. Dated 17 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 678}} {"id": "isc-te-00212-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Austbury plc", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "13 July 2026"}, "checklist": ["Public liability insurance schedule", "Witness statement from a staff member, signed", "Liability claim form, signed", "CCTV footage stills of the incident, issued within the last 3 months", "Incident report from the day, issued within the last 3 months, signed", "Staff training record for the duty manager, issued within the last 24 months, signed"], "submission": {"case": {"name": "Boltdale plc", "reference": "IQ-71848"}, "documents received": ["Witness statement from a staff member relating to Boltdale plc, dated 3 July 2026. Single page, signed by the staff member.", "Liability claim form relating to Boltdale plc, dated 6 May 2026. 3 pages, complete, signed by the claimant.", "Incident report from the day relating to Boltdale plc, dated 10 January 2026. 2 pages, complete, signed by the duty manager.", "CCTV footage stills of the incident relating to Boltdale plc, dated 25 May 2026. 2 pages, complete.", "Public liability insurance schedule relating to Boltdale plc, dated 4 June 2026. 4 pages, complete.", "Staff training record for the duty manager relating to Boltdale plc, dated 31 August 2025. 2 pages, complete, signed by the duty manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 737}} {"id": "isc-te-00484-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Mersmore LLP", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "7 September 2026"}, "checklist": ["CCTV footage stills of the incident, issued within the last 3 months", "staff training record for the duty manager, issued within the last 24 months, signed", "incident report from the day, issued within the last 3 months, signed", "photographs of the spillage on the floor, issued within the last 1 months", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months, signed", "witness statement from a staff member, signed"], "submission": {"case": {"name": "Elstvale Limited", "reference": "HM-93904", "details": ["The customer has appointed a solicitor for the claim."]}, "documents received": ["CCTV footage stills of the incident relating to Elstvale Limited, dated 17 July 2026. 2 pages, complete.", "Incident report from the day relating to Elstvale Limited, dated 15 August 2026. 2 pages, complete. Signed by the duty manager.", "Staff training record for the duty manager relating to Elstvale Limited, dated 11 November 2025. 2 pages, complete. Signed by the training manager.", "Photographs of the spillage on the floor relating to Elstvale Limited, dated 20 August 2026. 1 page.", "Witness statement from a staff member relating to Elstvale Limited, dated 11 June 2026. 1 page. Signed by the staff member."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Look at each checklist line that applies to this case. A required document will only count if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Where a line is conditional, it applies only when its circumstance holds for the case. Give the answer complete: every applicable line is met (extra documents do not matter). Give the answer incomplete: at least one applicable line is not met. Give the answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-17", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 779}} {"id": "isc-te-00308-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Mersvik Inc", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "10 March 2026"}, "checklist": ["Confirm the pack includes the guarantor consent letter, signed", "Confirm the pack includes the energy performance certificate, valid (not expired) on the date of the review", "Confirm the pack includes the stamp duty return, signed", "Confirm the pack includes the signed draft lease, signed"], "submission": {"case": {"name": "premises KB-78902", "reference": "VA-57606"}, "documents received": ["Stamp Duty Return for premises KB-78902, reference VA-57606, dated 16 January 2026. It is 2 pages, complete, and is signed by the tenant.", "Guarantor Consent Letter, dated 23 December 2025, for premises KB-78902, reference VA-57606. It is 1 page and carries the guarantor's signature.", "Energy Performance Certificate for premises KB-78902, reference VA-57606, showing an expiry date of 26 June 2026. It is 1 page.", "Signed Draft Lease for premises KB-78902, reference VA-57606, dated 17 December 2025. It is 12 pages, complete, and is signed by both the landlord and the tenant.", "Asbestos Survey Report for premises KB-78902, reference VA-57606, dated 28 November 2025. It is 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "partial", "defect": "signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 751}} {"id": "isc-te-00283-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Weskwood GmbH", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "29 May 2026"}, "checklist": ["Proof of deposit issued within the last 3 months", "Employment certificate issued within the last 1 month and signed", "Property valuation report issued within the last 6 months and signed", "Photo identity document valid (not expired) on the date of the review", "Bank statement issued within the last 3 months", "Mortgage application form, signed"], "submission": {"case": {"name": "property XP-89411", "reference": "BB-98566"}, "documents received": ["property_valuation_report_XP-89411.pdf. A property valuation report for property XP-89411, dated 19 March 2026. It has 10 pages, complete, and is signed by the valuer.", "photo_identity_document_XP-89411.pdf. A photo identity document for property XP-89411 showing an expiry date of 14 November 2027. It is a single page.", "mortgage_application_form_XP-89411.pdf. A mortgage application form for property XP-89411, dated 31 March 2026. It has 6 pages, complete, and is signed by the applicant.", "employment_certificate_XP-89411_v2.pdf. An employment certificate for property XP-89411, dated 27 May 2026. It is a single page and its signature line is empty.", "proof_of_deposit_XP-89411.pdf. A proof of deposit for property XP-89411, dated 10 April 2026. It is a single page.", "bank_statement_XP-89411.pdf. A bank statement for property XP-89411, dated 30 March 2026. It has 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "The task is to say whether the pack is complete against the checklist. Work through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-51", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00455-p2-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Prydwood Inc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "28 July 2026"}, "checklist": ["Check that there is an outstanding advance clearance check, signed.", "Check that there is a travel advance request form, signed.", "Check that there is an employee bank detail confirmation, issued within the last 6 months and signed.", "Check that there is a travel policy extract showing advance eligibility."], "submission": {"case": {"name": "Lotte Mabaker", "reference": "WY-52421"}, "documents received": ["Travel policy extract showing advance eligibility for Lotte Mabaker, dated 8 June 2026. Single page.", "Outstanding advance clearance check for Lotte Mabaker, dated 3 May 2026. Single page, signed by the accounts payable supervisor.", "Employee bank detail confirmation for Lotte Mabaker, dated 17 July 2026. Single page, signed by the payroll officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 600}} {"id": "isc-te-00221-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Uldham BV", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "12 May 2026"}, "checklist": ["Check the asbestos survey is in the pack.", "Check the floor load capacity report is in the pack, signed.", "Check the fire safety certificate is in the pack and valid (not expired) on the date of the review.", "Check the planning permission is in the pack.", "Check the racking inspection report is in the pack, issued within the last 12 months, signed."], "submission": {"case": {"name": "warehouse UO-70250", "reference": "NZ-96154"}, "documents received": ["asbestos-survey_UO-70250.pdf. An asbestos survey for warehouse UO-70250, dated 14 February 2026. 5 pages, complete.", "floor-load-capacity-report_UO-70250.pdf. A floor load capacity report for warehouse UO-70250, dated 26 February 2026, signed by the structural engineer. 3 pages, complete.", "planning-permission_UO-70250.pdf. A planning permission for warehouse UO-70250, dated 3 March 2026. 2 pages, complete.", "photograph-of-racking_UO-70250.pdf. A photograph of racking for warehouse UO-70250, dated 9 July 2025, with no inspector details, signed by the site manager. 2 pages, complete.", "fire-safety-certificate_UO-70250.pdf. A fire safety certificate for warehouse UO-70250, expiring 21 February 2027. 2 pages, complete.", "insurance-policy_UO-70250.pdf. A warehouse insurance policy for warehouse UO-70250, expiring 5 May 2028. 6 pages, complete.", "racking-inspection-report_UO-70250.pdf. A racking inspection report for warehouse UO-70250, dated 9 July 2025, signed by the racking inspector. 2 pages, complete.", "utilities-connection-certificate_UO-70250.pdf. A utilities connection certificate for warehouse UO-70250, dated 13 April 2026. A single page."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 5, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 745}} {"id": "isc-te-00188-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Fennfell Group", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "3 August 2026"}, "checklist": ["Travel advance request form, signed", "Line manager approval for the advance, signed", "Costed trip estimate sheet issued within the last 3 months, signed", "Outstanding advance clearance check, signed", "Payroll deduction agreement for recovery of the advance, signed"], "submission": {"case": {"name": "Daniel Aldwick", "reference": "RL-87051"}, "documents received": ["Travel Advance Request Form. The form relates to Daniel Aldwick and is dated 30 May 2026. It is a single page and is signed by the travelling employee.", "Payroll Deduction Agreement for Recovery of the Advance. The agreement relates to Daniel Aldwick and is dated 19 June 2026. It is a single page and is signed by the travelling employee.", "Costed Trip Estimate Sheet. The sheet relates to Daniel Aldwick and is dated 23 June 2026. It is a single page and is signed by the travelling employee.", "Outstanding Advance Clearance Check. The check relates to Daniel Aldwick and is dated 30 May 2026. It is a single page and is signed by the accounts payable reviewer.", "Line Manager Approval for the Advance. The approval relates to Daniel Aldwick and is dated 4 May 2026. It is a single page, but a sticky note covers the signature block, so it is not known whether it is signed.", "Employee Bank Detail Confirmation. The confirmation relates to Daniel Aldwick and is dated 27 March 2026. It is a single page and is signed by the travelling employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "partial", "defect": "signature not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 758}} {"id": "isc-te-00252-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Belmfell LLP", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "12 May 2026"}, "checklist": ["Facility access application form, signed", "Photo identity document, valid (not expired) on the date of the review", "Home institution endorsement letter, issued within the last 6 months and signed", "Radiation safety training certificate, issued within the last 24 months and signed", "Beam time or instrument booking confirmation", "Host scientist invitation letter, issued within the last 6 months and signed"], "submission": {"case": {"name": "Pieter Grubfield", "reference": "IS-40676"}, "documents received": ["Photo identity document - Grubfield.pdf. A photo identity document for Pieter Grubfield showing an expiry date of 20 September 2027. Single page.", "Home institution endorsement letter - Grubfield 29 Jul 2025.pdf. A home institution endorsement letter for Pieter Grubfield, issued on 29 July 2025. Single page, signed by the head of department.", "Beam time confirmation - Grubfield.pdf. A beam time or instrument booking confirmation for Pieter Grubfield, dated 4 March 2026. Single page.", "Radiation safety training certificate - Grubfield.pdf. A radiation safety training certificate for Pieter Grubfield, issued on 23 October 2024. Single page, signed by the training provider.", "Experiment safety clearance form - Grubfield.pdf. An experiment safety clearance form for Pieter Grubfield, dated 13 January 2026. 3 pages, complete. It is signed by the host scientist.", "Facility access application form - Grubfield.pdf. A facility access application form for Pieter Grubfield, dated 13 April 2026. 2 pages, complete. It is signed by the applicant.", "Host scientist invitation letter - Grubfield.pdf. A host scientist invitation letter for Pieter Grubfield, issued on 16 January 2026. Single page, signed by the host scientist."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 851}} {"id": "isc-te-00216-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Boltlund SAS", "reviewer": "the property legal team", "pack": "new commercial lease signing file", "purpose": "before a new commercial lease is completed", "date of the review": "7 September 2026"}, "checklist": ["Asbestos survey report, issued within the last 12 months.", "Energy performance certificate, valid (not expired) on the date of the review.", "Signed stamp duty return.", "Guarantor consent letter, signed."], "submission": {"case": {"name": "premises KD-67988", "reference": "ID-68027"}, "documents received": ["Letter_of_Support_KD-67988_24Aug2026.pdf. Letter of support for premises KD-67988, dated 24 August 2026. 1 page. Signed by the parent company's authorised signatory. It contains no guarantee wording.", "Stamp_Duty_Return_KD-67988_29Jul2026.pdf. Stamp duty return for premises KD-67988, dated 29 July 2026. 2 pages, complete. Signed by the tenant's finance director.", "EPC_KD-67988.pdf. Energy performance certificate for premises KD-67988, expiring 23 April 2027. 1 page.", "Guarantor_Consent_Letter_KD-67988_24Aug2026.pdf. Guarantor consent letter for premises KD-67988, dated 24 August 2026. 1 page. Signed by the guarantor.", "Asbestos_Survey_Report_KD-67988_22Aug2026.pdf. Asbestos survey report for premises KD-67988, dated 22 August 2026. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "new commercial lease signing file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 786}} {"id": "isc-te-00258-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Orrgard Limited", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "20 April 2026"}, "checklist": ["Data protection impact assessment, issued within the last 12 months and signed.", "Merchant account agreement, signed.", "Test environment transaction log, issued within the last 1 months.", "Penetration test summary, issued within the last 6 months and signed.", "Go-live sign-off certificate, issued within the last 1 months and signed.", "Fraud screening configuration sheet, signed."], "submission": {"case": {"name": "payment gateway KK-52797", "reference": "ZJ-99275"}, "documents received": ["Merchant account agreement for payment gateway KK-52797, dated 28 December 2025. 6 pages, complete. Signed by the Payments Director.", "Data protection impact assessment for payment gateway KK-52797, dated 6 January 2026. 5 pages, complete. Signed by the Data Protection Officer.", "Fraud screening configuration sheet for payment gateway KK-52797, dated 4 January 2026. Single page. Signed by the Fraud Prevention Lead.", "Go-live sign-off certificate for payment gateway KK-52797, dated 12 April 2026. Single page. Signed by the Head of Payments.", "Gateway integration request form for payment gateway KK-52797, dated 6 March 2026. 2 pages, complete. Signed by the requesting manager.", "Penetration test summary for payment gateway KK-52797, dated 17 November 2025. 3 pages, complete. Signed by the penetration tester.", "Test environment transaction log for payment gateway KK-52797, dated 12 April 2026. Pages 1-1 of 4 are included."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 806}} {"id": "isc-te-00355-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Baxmere Limited", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "4 August 2026"}, "checklist": ["Vehicle condition report, signed", "Driving licence, valid (not expired) on the date of the review, signed", "Passport, valid (not expired) on the date of the review, signed", "Credit card in the driver's name, valid (not expired) on the date of the review, signed"], "submission": {"case": {"name": "Orla Fitzard", "reference": "GK-82009"}, "documents received": ["A scanned passport in the name of Orla Fitzard, showing an expiry date of 14 November 2027. Single page. The passport is signed by the bearer.", "A scanned credit card in the driver's name of Orla Fitzard, showing an expiry date of 9 February 2027. Single page. The card is signed by the cardholder.", "A scanned driving licence in the name of Orla Fitzard, showing an expiry date of 3 May 2028. 2 pages, complete. The licence is signed by the licence holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 643}} {"id": "isc-te-00178-p4-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Aldford Inc", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "21 May 2026"}, "checklist": ["Restaurant receipt issued within the last 6 months", "Hotel invoice issued within the last 6 months", "Conference fee invoice issued within the last 12 months", "Taxi fare receipt issued within the last 6 months"], "submission": {"case": {"name": "Amelia Paskez", "reference": "EQ-72163"}, "documents received": ["Currency conversion statement.pdf. A single-page currency conversion statement concerning Amelia Paskez, showing its date of issue as 25 December 2025.", "Conference fee invoice.pdf. A single-page conference fee invoice concerning Amelia Paskez, showing its date of issue as 19 April 2026.", "Restaurant receipt.pdf. A single-page restaurant receipt concerning Amelia Paskez, showing its date of issue as 20 March 2026.", "Hotel invoice.pdf. A hotel invoice concerning Amelia Paskez, showing its date of issue as 27 January 2026. Pages 1-1 of 2 are included.", "Taxi fare receipt.pdf. A single-page taxi fare receipt concerning Amelia Paskez, showing its date of issue as 9 May 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "partial", "defect": "pages missing", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 662}} {"id": "isc-te-00070-p5-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Teskcrest SAS", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "15 September 2026"}, "checklist": ["Grant fund eligibility note, issued within the last 6 months, signed", "Training needs assessment, signed", "Installation requirements note", "Equipment purchase request form, signed", "Cost-benefit justification"], "submission": {"case": {"name": "equipment OJ-32008", "reference": "IV-17107"}, "documents received": ["Grant fund eligibility note for equipment OJ-32008, dated 16 June 2026, 1 page, signed by the grants officer.", "Maintenance plan for equipment OJ-32008, dated 4 July 2026, 2 pages, complete.", "Training needs assessment for equipment OJ-32008, dated 23 June 2026, 1 page, signed by the training coordinator.", "Equipment purchase request form for equipment OJ-32008, dated 8 July 2026, 2 pages, complete, signed by the requesting department head.", "Cost-benefit justification for equipment OJ-32008, dated 5 September 2026, 3 pages, complete.", "File scan_0417.pdf: the file will not open, so the contents cannot be seen.", "Installation requirements note for equipment OJ-32008, dated 30 June 2026, 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 723}} {"id": "isc-te-00440-p3-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Vornshaw Limited", "reviewer": "the architecture review board", "pack": "design document review pack", "purpose": "before a design document is approved for implementation", "date of the review": "26 June 2026"}, "checklist": ["Check that the pack contains the proposed architecture diagram.", "Check that the pack contains the review board feedback summary, issued within the last 3 months and signed.", "Check that the pack contains the security threat model, issued within the last 6 months.", "If the design introduces a new third-party dependency, also check that the pack contains the third-party dependency risk assessment, issued within the last 6 months and signed.", "Check that the pack contains the alternatives considered table.", "Check that the pack contains the cost estimate sheet, issued within the last 6 months."], "submission": {"case": {"name": "design document HR-11465", "reference": "YD-70116", "details": ["The design introduces no new third-party dependency."]}, "documents received": ["HR-11465 proposed architecture diagram 27 May 2026.pdf - Proposed architecture diagram about design document HR-11465, showing a date of issue of 27 May 2026. A single page.", "HR-11465 cost estimate sheet 28 February 2026.pdf - Cost estimate sheet about design document HR-11465, showing a date of issue of 28 February 2026. 2 pages, complete.", "HR-11465 review board feedback summary 17 May 2026.pdf - Review board feedback summary about design document HR-11465, showing a date of issue of 17 May 2026. 2 pages, complete. Signed by the architecture review board chair.", "File 7.pdf - The file will not open, so its contents cannot be seen.", "HR-11465 security threat model 28 April 2026.pdf - Security threat model about design document HR-11465, showing a date of issue of 28 April 2026. 4 pages, complete.", "HR-11465 alternatives considered table 4 March 2026.pdf - Alternatives considered table about design document HR-11465, showing a date of issue of 4 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "design document review pack", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 900}} {"id": "isc-te-00488-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Dravwood & Co", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "22 May 2026"}, "checklist": ["Breach evidence log, issued within the last 1 month and signed", "Original service agreement copy", "Losses calculation statement, issued within the last 1 month and signed", "If the defaulting party is a public sector body, also: public sector termination approvals record, issued within the last 3 months and signed", "If the contract requires a dispute to go to mediation first, also: mediation request confirmation, issued within the last 1 month and signed", "Default notice previously served, issued within the last 6 months and signed"], "submission": {"case": {"name": "Bravberg SAS", "reference": "YW-54965", "details": ["The defaulting party is a public sector body.", "The contract allows termination without prior mediation."]}, "cover note": "Could you approve this quickly? All the paperwork is in order.", "documents received": ["Breach evidence log for Bravberg SAS, dated 13 May 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Public sector termination approvals record for Bravberg SAS, dated 28 March 2026. 2 pages, complete. Signed by the head of procurement.", "Original service agreement copy relating to Bravberg SAS, dated 22 March 2026. Pages 1-7 of 10 are included.", "Cure period expiry calculation for Bravberg SAS, dated 6 May 2026. 2 pages, complete. Signed by the dispute resolution analyst.", "Termination notice draft for Bravberg SAS, dated 28 March 2026. 2 pages, complete. Signed by the senior legal counsel.", "Losses calculation statement for Bravberg SAS, dated 8 May 2026. 3 pages, complete. Signed by the finance manager.", "Default notice previously served on Bravberg SAS, dated 21 December 2025. Single page. Signed by the contracts manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "partial", "defect": "pages missing", "n_lines": 6, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 844}} {"id": "isc-te-00165-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Teskwater Limited", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "3 July 2026"}, "checklist": ["Gateway integration request form, signed", "Test environment transaction log, issued within the last 1 months", "If the gateway will handle recurring subscription payments, also: subscription billing mandate template, signed", "Go-live sign-off certificate, issued within the last 1 months, signed", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review", "Payment gateway technical specification", "Penetration test summary, issued within the last 6 months, signed"], "submission": {"case": {"name": "payment gateway EG-51001", "reference": "MP-69353", "details": ["The gateway will handle recurring subscription payments.", "The gateway will not store customers' card details."]}, "cover note": "I've put this pack together for gateway EG-51001, but I'm not certain everything needed is in there, so please take a look and let me know if anything else is required before it goes live.", "documents received": ["Subscription billing mandate template for payment gateway EG-51001, dated 4 April 2026. 2 pages, complete. It is signed by the Treasury Manager.", "Payment gateway technical specification for payment gateway EG-51001, dated 5 May 2026. 8 pages, complete.", "Gateway integration request form for payment gateway EG-51001, dated 3 April 2026. 2 pages, complete. It is signed by the Head of Payments and IT Security.", "Penetration test summary for payment gateway EG-51001, dated 2 March 2026. 3 pages, complete. It is signed by the Penetration Test Team Manager.", "Test environment transaction log for payment gateway EG-51001, dated 30 June 2026. 4 pages, complete.", "Go-live sign-off certificate for payment gateway EG-51001, dated 14 June 2026. 1 page. It is signed by the Payments Operations Director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 874}} {"id": "isc-te-00034-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Kenvstow GmbH", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "2 March 2026"}, "checklist": ["Utility supplier's letter confirming the supply was cut off, issued within the last 12 months", "If the flood water reached the upper floor of the property, also: upper floor damage schedule, signed", "Photographs of flood water in the rooms, issued within the last 1 months", "Council flood warning notice, issued within the last 12 months", "Loss adjuster's inspection report, issued within the last 6 months, signed", "Buildings insurance policy schedule", "Debris removal invoice, issued within the last 6 months"], "submission": {"case": {"name": "property EP-34443", "reference": "ES-19965", "details": ["The flood water stayed at ground floor level."]}, "cover note": "I apologise that this pack was put together in a rush. Kind regards, Mert Nebbmore", "documents received": ["Flood claim form about property EP-34443. Dated 2 December 2025. 5 pages, complete. Signed by the policyholder.", "Loss adjuster's inspection report about property EP-34443. Dated 14 February 2026. 6 pages, complete. Signed by the loss adjuster.", "Buildings insurance policy schedule about property EP-34443. Dated 30 November 2025. 5 pages, complete.", "Drying contractor's certificate of completion about property EP-34443. Dated 30 September 2025. 2 pages, complete. Signed by the drying contractor.", "Debris removal invoice about property EP-34443. Dated 27 December 2025. 1 page.", "Utility supplier's letter confirming the supply was cut off about property EP-34443. Dated 25 March 2025. 1 page.", "Council flood warning notice about property EP-34443. Dated 2 November 2025. 1 page.", "Photographs of flood water in the rooms about property EP-34443. Dated 23 February 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 899}} {"id": "isc-te-00323-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Bravbury plc", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "20 March 2026"}, "checklist": ["Confirm the pack contains the brand colour specification", "Confirm the pack contains the waste disposal plan", "Confirm the pack contains the kit contents list", "Confirm the pack contains a signed point of sale design proof"], "submission": {"case": {"name": "merchandising kit TQ-71056", "reference": "ZM-22416"}, "documents received": ["A brand colour specification for merchandising kit TQ-71056, dated 27 December 2025. It is a single page.", "A waste disposal plan for merchandising kit TQ-71056, dated 4 December 2025. It is a single page.", "A point of sale design proof for merchandising kit TQ-71056, dated 29 December 2025. 4 pages, complete. The signature line is empty, so the document is not signed.", "A kit contents list for merchandising kit TQ-71056, dated 14 December 2025. 2 pages, complete.", "A store installation guide for merchandising kit TQ-71056, dated 15 February 2026. 6 pages, complete.", "A kit cost breakdown for merchandising kit TQ-71056, dated 18 January 2026. 2 pages, complete. It has been signed by the finance officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 743}} {"id": "isc-te-00003-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Quorfell Partners", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "18 June 2026"}, "checklist": ["Check that the pack includes a signed post-change test plan.", "Check that the pack includes a current rule set export issued within the last 1 month.", "Check that the pack includes a signed firewall change request form.", "Check that the pack includes a peer review checklist issued within the last 1 month and signed."], "submission": {"case": {"name": "firewall change JC-89924", "reference": "GT-12592"}, "cover note": "A colleague on the network security team has already gone through this pack, so it should be in good order for the review on 18 June 2026.", "documents received": ["jc-89924_peer_review_checklist.pdf. Peer review checklist for firewall change JC-89924, dated 2 June 2026. Single page. Signed by the reviewing network security analyst.", "jc-89924_firewall_change_request_form_v1.pdf. Firewall change request form for firewall change JC-89924, dated 15 March 2026. 3 pages, complete. The signature line is empty, so the form is not signed.", "jc-89924_post-change_test_plan.pdf. Post-change test plan for firewall change JC-89924, dated 16 May 2026. 2 pages, complete. Signed by the lead network security engineer.", "jc-89924_current_rule_set_export.pdf. Current rule set export for firewall change JC-89924, dated 5 June 2026. 8 pages, complete.", "jc-89924_rollback_plan.pdf. Rollback plan for firewall change JC-89924, dated 8 June 2026. 2 pages, complete. Signed by the lead network security engineer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 821}} {"id": "isc-te-00475-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Jaskside plc", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "5 March 2026"}, "checklist": ["If the employee has caring responsibilities for a dependent, also: caring responsibilities statement (signed).", "Trial period proposal (signed).", "Current working pattern statement (issued within the last 3 months).", "If the request is to work entirely from home, also: home working equipment checklist (signed).", "Line manager opinion note (issued within the last 2 months, signed).", "Impact assessment on the team (signed).", "Proposed working pattern plan (signed).", "Client or service impact statement (signed)."], "submission": {"case": {"name": "Beatriz Zellopoulos", "reference": "FK-25780", "details": ["The employee does not have caring responsibilities for a dependent.", "The request is not to work entirely from home."]}, "documents received": ["Trial period proposal for Beatriz Zellopoulos. Dated 10 December 2025. Single page, signed by Beatriz Zellopoulos.", "Previous flexible working requests record for Beatriz Zellopoulos. Dated 17 April 2025. Single page.", "Flexible working request form from Beatriz Zellopoulos. Dated 9 February 2026. 3 pages, complete, signed by Beatriz Zellopoulos.", "Proposed working pattern plan for Beatriz Zellopoulos. Dated 12 November 2025. 2 pages, complete, signed by Beatriz Zellopoulos.", "Impact assessment on the team regarding Beatriz Zellopoulos. Dated 7 February 2026. 3 pages, complete, signed by the line manager.", "Client or service impact statement for Beatriz Zellopoulos. Dated 15 December 2025. Single page, signed by the line manager.", "Line manager opinion note on Beatriz Zellopoulos. Dated 2 February 2026. 2 pages, complete, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 841}} {"id": "isc-te-00402-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Wilmdale Limited", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "14 July 2026"}, "checklist": ["Trade account application form, signed.", "Bank reference letter, issued within the last 6 months, signed.", "Company registration certificate.", "If the customer is a newly incorporated company, also: director identification record, signed.", "Credit reference agency report, issued within the last 3 months.", "Credit limit approval memo, issued within the last 1 months, signed."], "submission": {"case": {"name": "Larvridge Partners", "reference": "JU-12708", "details": ["The customer is not a newly incorporated company."]}, "documents received": ["Signed credit terms agreement for Larvridge Partners, dated 23 April 2026. 4 pages, complete. Signed by the customer's authorised signatory.", "Bank reference letter for Larvridge Partners, dated 9 May 2026. Single page. Signed by a bank officer.", "Trade references letter for Larvridge Partners, dated 6 May 2026. Single page. Signed by the referee company's authorised signatory.", "Credit limit approval memo for Larvridge Partners, dated 22 November 2025. Single page. Signed by the credit control manager.", "Credit reference agency report for Larvridge Partners, dated 4 May 2026. 6 pages, complete.", "Credit limit approval memo for Larvridge Partners, dated 1 July 2026. Single page. Signed by the credit control manager.", "Trade account application form for Larvridge Partners, dated 5 April 2026. 3 pages, complete. Signed by the customer's authorised signatory.", "Company registration certificate for Larvridge Partners, dated 27 June 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Go through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-49", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 799}} {"id": "isc-te-00472-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Lombcliff Partners", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "3 August 2026"}, "checklist": ["Risk assessment for the task, issued within the last 3 months and signed.", "Cost estimate, issued within the last 3 months and signed.", "If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Access authorisation slip, signed.", "Photographs of the fault, issued within the last 3 months.", "Parts order confirmation, issued within the last 1 months."], "submission": {"case": {"name": "maintenance request XO-61833", "reference": "IR-85731", "details": ["The job involves no work at height above two metres."]}, "documents received": ["Photographs of the fault for maintenance request XO-61833, dated 19 July 2026. 2 pages, complete.", "Access authorisation slip for maintenance request XO-61833, dated 6 July 2026. Single page. Signed by the access controller.", "Risk assessment for the task on maintenance request XO-61833, dated 4 June 2026. 5 pages, complete. Signed by the assessing supervisor.", "Planned completion date sheet for maintenance request XO-61833, dated 11 April 2026. Single page. Signed by the planning coordinator.", "Parts order confirmation for maintenance request XO-61833. The date of issue is covered by a stamp. Single page.", "Cost estimate for maintenance request XO-61833, dated 1 June 2026. 2 pages, complete. Signed by the estimating officer."]}}, "question": {"type": "choice", "instructions": "Evaluate the pack against the checklist to decide if it is complete. Go through every checklist line that applies to this case. A required document only counts if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The verdict complete: every applicable line is met (extra documents do not matter). The verdict incomplete: at least one applicable line is not met. The verdict unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Since cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-21", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 789}} {"id": "isc-te-00365-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Jarlthorpe plc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "2 March 2026"}, "checklist": ["Outstanding advance clearance check, signed.", "Employee bank detail confirmation, issued within the last 6 months and signed.", "Payroll deduction agreement for recovery of the advance, signed.", "Travel advance request form, signed."], "submission": {"case": {"name": "Noor Plumden", "reference": "BH-90150"}, "documents received": ["Payroll deduction agreement for recovery of the advance for Noor Plumden. The document is dated 24 November 2025 and is a single page. It is signed by the payroll officer.", "Employee bank detail confirmation for Noor Plumden. The document is dated 22 November 2025 and is a single page. It is signed by the payroll officer.", "Travel policy extract showing advance eligibility for Noor Plumden. The document is dated 23 January 2026 and is a single page.", "Travel advance request form for Noor Plumden. The document is dated 21 February 2025 and is a single page. It is signed by Noor Plumden."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 648}} {"id": "isc-te-00299-p5-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Glenby Ltd", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "16 September 2026"}, "checklist": ["If the employee has caring responsibilities for a dependent, also: caring responsibilities statement (signed)", "client or service impact statement (signed)", "trial period proposal (signed)", "previous flexible working requests record (issued within the last 24 months)", "impact assessment on the team (signed)"], "submission": {"case": {"name": "Siobhan Nebbins", "reference": "XG-87607", "details": ["The employee has caring responsibilities for a dependent."]}, "documents received": ["Trial period proposal about Siobhan Nebbins. Dated 12 July 2026. 1 page. Signed by the line manager.", "Previous flexible working requests record about Siobhan Nebbins. Dated 23 August 2025. 1 page.", "Client or service impact statement about Siobhan Nebbins. Dated 26 May 2026. 1 page. Signed by the line manager.", "Impact assessment on the team about Siobhan Nebbins. Dated 9 June 2026. 3 pages, complete. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 657}} {"id": "isc-te-00312-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Abrbury Ltd", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "26 May 2026"}, "checklist": ["Outbound loading record issued within the last 1 months and signed.", "Cross-dock slot booking sheet issued within the last 1 months and signed.", "Transfer manifest signed.", "Inbound unloading record issued within the last 1 months and signed.", "Transfer completion confirmation issued within the last 1 months and signed.", "Seal number log issued within the last 1 months and signed.", "If the transfer is an international movement, also: transit customs document, signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer LP-90487", "reference": "KA-79216", "details": ["The transfer is not an international movement.", "The transfer includes a temperature-controlled load."]}, "cover note": "Please approve cross-dock transfer LP-90487 as soon as you can, as everything in the pack is in order. Piotr Cadham", "documents received": ["Seal number log for cross-dock transfer LP-90487, dated 17 May 2026, 1 page. Signed by the sealing operative.", "Transfer manifest for cross-dock transfer LP-90487, dated 24 February 2026, 3 pages, complete. Signed by the transport planner.", "Transfer completion confirmation for cross-dock transfer LP-90487, dated 12 April 2026, 1 page. Signed by the transfer coordinator.", "Damaged goods exception sheet for cross-dock transfer LP-90487, dated 20 May 2026, 1 page. Signed by the inbound unloading supervisor.", "Cross-dock slot booking sheet for cross-dock transfer LP-90487, dated 24 May 2026, 1 page. Signed by the slot booking coordinator.", "Inbound unloading record for cross-dock transfer LP-90487, dated 20 May 2026, 1 page. Signed by the inbound unloading supervisor.", "Outbound loading record for cross-dock transfer LP-90487, dated 16 May 2026, 1 page. Signed by the outbound loading supervisor.", "Cross-dock chiller unit check sheet for cross-dock transfer LP-90487, dated 6 May 2026, 1 page. Signed by the chiller unit technician."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 968}} {"id": "isc-te-00287-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Fervburg SAS", "reviewer": "the payments disputes team", "pack": "chargeback dispute file", "purpose": "to contest a card chargeback claim", "date of the review": "27 April 2026"}, "checklist": ["Confirm the pack contains the chargeback response form, signed.", "If the goods were delivered to an address different from the billing address, also include the address verification check report, issued within the last 3 months.", "Confirm the pack contains the terms of sale acceptance log, issued within the last 12 months.", "Confirm the pack contains the customer order history extract, issued within the last 6 months.", "Confirm the pack contains the transaction record printout, issued within the last 3 months."], "submission": {"case": {"name": "disputed transaction TL-11034", "reference": "MA-40092", "details": ["The goods were delivered to the billing address."]}, "documents received": ["Transaction record printout for disputed transaction TL-11034, dated 25 April 2026. Single page.", "Customer order history extract for disputed transaction TL-11034, dated 26 February 2026. 2 pages, complete.", "Chargeback response form for disputed transaction TL-11034, dated 4 April 2026. 2 pages, complete. The form is signed by the payments disputes team lead.", "Terms of sale acceptance log for disputed transaction TL-11034. The date of issue is smudged and cannot be read. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "chargeback dispute file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 709}} {"id": "isc-te-00479-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Oxlwater Partners", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "27 March 2026"}, "checklist": ["Current working pattern statement, issued within the last 3 months.", "If the employee has caring responsibilities for a dependent, also: caring responsibilities statement, signed.", "Proposed working pattern plan, signed.", "Line manager opinion note, issued within the last 2 months, signed.", "Client or service impact statement, signed.", "Impact assessment on the team, signed.", "Trial period proposal, signed."], "submission": {"case": {"name": "Rory Ustins", "reference": "JA-54555"}, "documents received": ["Impact assessment on the team - Rory Ustins.pdf. This is an impact assessment on the team about Rory Ustins, showing its date of issue as 27 December 2025. It runs to 3 pages, complete, and is signed by the line manager.", "Caring responsibilities statement - Rory Ustins.pdf. This is a caring responsibilities statement about Rory Ustins, showing its date of issue as 28 January 2026. It is a single page, signed by the employee.", "Proposed working pattern plan - Rory Ustins.pdf. This is a proposed working pattern plan about Rory Ustins, showing its date of issue as 4 February 2026. It runs to 2 pages, complete, and is signed by the employee.", "Flexible working request form - Rory Ustins.pdf. This is a flexible working request form about Rory Ustins, showing its date of issue as 15 March 2026. It runs to 3 pages, complete, and is signed by the employee.", "Line manager opinion note - Rory Ustins.pdf. This is a line manager opinion note about Rory Ustins, showing its date of issue as 10 February 2026. It runs to 2 pages, complete, and is signed by the line manager.", "Trial period proposal - Rory Ustins.pdf. This is a trial period proposal about Rory Ustins, showing its date of issue as 18 March 2026. It is a single page, signed by the line manager.", "Current working pattern statement - Rory Ustins.pdf. This is a current working pattern statement about Rory Ustins, showing its date of issue as 6 March 2026. It is a single page.", "Client or service impact statement - Rory Ustins.pdf. This is a client or service impact statement about Rory Ustins, showing its date of issue as 7 January 2026. It is a single page, signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 966}} {"id": "isc-te-00043-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Austmere LLP", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "2 September 2026"}, "checklist": ["Racking inspection report, issued within the last 12 months and signed.", "Signed lease agreement.", "Planning permission.", "Fire safety certificate, valid (not expired) on the date of the review.", "Asbestos survey."], "submission": {"case": {"name": "warehouse BB-20125", "reference": "KU-84726"}, "cover note": "All the paperwork for this pack is in order, so I would be grateful if you could approve it as quickly as possible.", "documents received": ["BB-20125_lease_agreement_2026-06-13.pdf. Signed lease agreement for warehouse BB-20125, dated 13 June 2026, 8 pages, complete. It is signed by the landlord and the tenant.", "BB-20125_planning_permission_2026-07-06.pdf. Planning permission for warehouse BB-20125, dated 6 July 2026, 2 pages, complete.", "BB-20125_fire_safety_certificate_expires_2026-10-18.pdf. Fire safety certificate for warehouse BB-20125, with an expiry date of 18 October 2026, 2 pages, complete.", "BB-20125_asbestos_survey_2026-05-17.pdf. Asbestos survey for warehouse BB-20125, dated 17 May 2026, 5 pages, complete.", "BB-20125_racking_inspection_report_2026-05-28_v3.pdf. Racking inspection report for warehouse BB-20125, dated 28 May 2026, showing pages 1 to 2; no total page count appears anywhere in the document. It is signed by the inspecting engineer."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack is complete when checked against the checklist. Go through each line of the checklist that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only if its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "variant-10", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 850}} {"id": "isc-te-00382-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Norvwater Group", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "14 May 2026"}, "checklist": ["Confirm the planned completion date sheet is included and signed.", "Confirm the location details sheet is included.", "Confirm the access authorisation slip is included and signed.", "Confirm the parts order confirmation is included and was issued within the last 1 months.", "Confirm the cost estimate is included, was issued within the last 3 months, and is signed."], "submission": {"case": {"name": "maintenance request AM-49331", "reference": "TF-32348"}, "documents received": ["AM-49331_job_request_form.pdf - Job request form for maintenance request AM-49331, dated 6 May 2026. Single page. Signed by the requesting manager.", "AM-49331_cost_estimate_undated.pdf - Cost estimate for maintenance request AM-49331. The issue date is covered by a stamp. 2 pages, complete. Signed by the estimating officer.", "AM-49331_parts_order_confirmation.pdf - Parts order confirmation for maintenance request AM-49331, dated 24 April 2026. Single page.", "AM-49331_planned_completion_date_sheet.pdf - Planned completion date sheet for maintenance request AM-49331, dated 26 January 2026. Single page. Signed by the maintenance supervisor.", "AM-49331_location_details_sheet.pdf - Location details sheet for maintenance request AM-49331, dated 2 May 2026. Single page.", "AM-49331_access_authorisation_slip.pdf - Access authorisation slip for maintenance request AM-49331, dated 25 January 2026. Single page. Signed by the security manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 802}} {"id": "isc-te-00243-p2-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Ambmont Limited", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "9 June 2026"}, "checklist": ["Check that the pack contains the invoice discrepancy log.", "Check that the pack contains the supplier response letter, issued within the last 3 months and signed.", "Check that the pack contains the quality inspection report, issued within the last 6 months and signed.", "Check that the pack contains the delivery record summary, issued within the last 12 months.", "Check that the pack contains the service level summary, issued within the last 12 months."], "submission": {"case": {"name": "Ilvwood Limited", "reference": "AY-23034"}, "cover note": "Please could you approve this pack as soon as possible? All the paperwork is in order, so a quick turnaround would be much appreciated.", "documents received": ["Contract compliance checklist for Ilvwood Limited, dated 3 April 2026. 3 pages, complete. Signed by the contract manager.", "Invoice discrepancy log for Ilvwood Limited, dated 24 March 2026. 2 pages, complete.", "Quality inspection report for Ilvwood Limited, dated 7 June 2026. 3 pages, complete. Signed by the quality inspector.", "Supplier response letter for Ilvwood Limited, dated 29 May 2026. Single page; the signature line is empty, so it is not signed.", "Delivery record summary for Ilvwood Limited, dated 5 March 2026. 2 pages, complete.", "Service level summary for Ilvwood Limited, dated 25 June 2025. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "partial", "defect": "not signed", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 748}} {"id": "isc-te-00345-p3-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Quorwald Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 March 2026"}, "checklist": ["Marketing consent form, signed, on file.", "Identity verification document, valid (not expired) on the date of the review, on file.", "Loyalty scheme enrolment form, signed, on file.", "If the customer is joining as a household account with a shared card, also: household member details form, signed, on file.", "Customer contact details sheet, signed, on file.", "Points transfer request, signed, on file.", "Terms and conditions acceptance sheet, signed, on file.", "If the customer is transferring points from a rival scheme, also: points transfer evidence statement, issued within the last 3 months and signed, on file."], "submission": {"case": {"name": "Siobhan Zellson", "reference": "RV-67522", "details": ["The customer is joining as a single-person account.", "The customer is transferring points from a rival scheme."]}, "documents received": ["Marketing consent form for Siobhan Zellson. It shows a date of issue of 17 January 2026 and is signed by Siobhan Zellson. It is a single page.", "Customer contact details sheet for Siobhan Zellson. It shows a date of issue of 29 December 2025 and is signed by Siobhan Zellson. It is a single page.", "Identity verification document for Siobhan Zellson. It shows an expiry date of 17 April 2027. It is a single page.", "Points transfer request for Siobhan Zellson. It shows a date of issue of 19 February 2026 and is signed by Siobhan Zellson. It is a single page.", "Terms and conditions acceptance sheet for Siobhan Zellson. It shows a date of issue of 4 January 2026 and is signed by Siobhan Zellson. It is a single page.", "Loyalty scheme enrolment form for Siobhan Zellson. It shows a date of issue of 11 January 2026 and is signed by Siobhan Zellson. It is a single page.", "Points transfer evidence statement for Siobhan Zellson. It shows a date of issue of 4 March 2026 and is signed by Siobhan Zellson. It is a single page."]}}, "question": {"type": "choice", "instructions": "Review the pack against the checklist and reach a decision. Go through every checklist line that applies to this case. A required document counts only if it matches the kind of document listed (not merely a similar one), is about the subject of the case, contains all its pages, is signed wherever the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Because cover notes and labels may be misleading, judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-41", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 919}} {"id": "isc-te-00010-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ilvwell & Co", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "17 June 2026"}, "checklist": ["Confirmation of contact details, issued within the last 3 months, is on file.", "Signed delivery address confirmation is on file.", "Signed signature verification record is on file.", "Signed fraud questionnaire is on file."], "submission": {"case": {"name": "Femke Gadstad", "reference": "XS-17516"}, "documents received": ["Delivery address confirmation - Femke Gadstad.pdf. Delivery address confirmation for Femke Gadstad, issued on 1 June 2026. It is 1 page and signed by the cardholder.", "Signature verification record - Femke Gadstad.pdf. Signature verification record for Femke Gadstad, issued on 25 February 2026. It is 1 page and signed by the card services officer.", "Fraud questionnaire - Femke Gadstad.pdf. Fraud questionnaire for Femke Gadstad, issued on 30 April 2026. It is 2 pages, complete, and signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 629}} {"id": "isc-te-00178-p3-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Aldford Inc", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "21 May 2026"}, "checklist": ["Restaurant receipt issued within the last 6 months", "Hotel invoice issued within the last 6 months", "Conference fee invoice issued within the last 12 months", "Taxi fare receipt issued within the last 6 months"], "submission": {"case": {"name": "Amelia Paskez", "reference": "EQ-72163"}, "cover note": "I apologise that this pack was put together in a rush.", "documents received": ["Conference fee invoice.pdf. A single-page conference fee invoice concerning Amelia Paskez, showing its date of issue as 19 April 2026.", "Restaurant receipt.pdf. A single-page restaurant receipt concerning Amelia Paskez, showing its date of issue as 20 March 2026.", "Expense claim form.pdf. An expense claim form concerning Amelia Paskez, showing its date of issue as 1 February 2026. All 2 of its 2 pages are included, complete, and it is signed by the claiming employee, Amelia Paskez.", "Taxi fare receipt.pdf. A single-page taxi fare receipt concerning Amelia Paskez, showing its date of issue as 9 May 2026.", "Hotel invoice.pdf. A hotel invoice concerning Amelia Paskez, showing its date of issue as 27 January 2026. All 2 of its 2 pages are included, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 704}} {"id": "isc-te-00324-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Brenmont Partners", "reviewer": "the retail marketing team", "pack": "retail merchandising kit file", "purpose": "before a merchandising kit is shipped to stores", "date of the review": "9 June 2026"}, "checklist": ["Shipping manifest, issued within the last 1 months", "Point of sale design proof, signed", "If the kit includes an electrical display unit, also: electrical safety test certificate, issued within the last 12 months", "Store installation guide", "Kit cost breakdown, issued within the last 3 months and signed", "Waste disposal plan"], "submission": {"case": {"name": "merchandising kit CY-19341", "reference": "ZV-32595"}, "documents received": ["Shipping manifest - CY-19341.pdf — A shipping manifest for merchandising kit CY-19341. It is dated 28 May 2026. 2 pages, complete.", "Kit cost breakdown - CY-19341.pdf — A kit cost breakdown for merchandising kit CY-19341, dated 5 June 2026. 2 pages, complete. It is signed by the retail marketing team's finance contact.", "Waste disposal plan - CY-19341.pdf — A waste disposal plan for merchandising kit CY-19341, dated 11 May 2026. 1 page.", "Point of sale design proof - CY-19341.pdf — A point of sale design proof for merchandising kit CY-19341, dated 4 May 2026. 4 pages, complete. It carries a signature from the design studio's lead designer.", "File - ZV-32595.pdf — The file will not open, so its contents cannot be seen.", "Store installation guide - CY-19341.pdf — A store installation guide for merchandising kit CY-19341. It is dated 5 April 2026. 6 pages, complete.", "Electrical safety test certificate - CY-19341.pdf — An electrical safety test certificate for merchandising kit CY-19341, dated 4 November 2025. 1 page.", "Brand colour specification - CY-19341.pdf — A brand colour specification for merchandising kit CY-19341, dated 2 June 2026. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "retail merchandising kit file", "test_type": "conditional", "defect": "document present (circumstance not stated), plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 917}} {"id": "isc-te-00373-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Selvmont & Co", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "24 April 2026"}, "checklist": ["Signature verification record, signed", "Card replacement request form, signed", "Photo identification, valid (not expired) on the date of the review", "Confirmation of contact details, issued within the last 3 months", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "If the card was stolen rather than lost, also: police report reference document, issued within the last 1 months, signed"], "submission": {"case": {"name": "Matthias Sabopoulos", "reference": "SX-64326", "details": ["The cardholder is at their home address.", "The card was stolen rather than lost."]}, "documents received": ["Police report reference document for Matthias Sabopoulos, dated 14 April 2026. Single page. It is signed by the reporting officer.", "Card replacement request form for Matthias Sabopoulos, dated 4 February 2026. 2 pages, complete. It is signed by the cardholder.", "Signature verification record for Matthias Sabopoulos, dated 1 February 2026. Single page. The signature line is empty, so it is not signed.", "Confirmation of contact details for Matthias Sabopoulos, dated 7 April 2026. Single page.", "Photo identification for Matthias Sabopoulos, showing an expiry date of 9 October 2028. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 2, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 717}} {"id": "isc-te-00290-p2-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Raskmore plc", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "17 March 2026"}, "checklist": ["Photographs of the fault, issued within the last 3 months", "Cost estimate, issued within the last 3 months, signed", "Job request form, signed", "Planned completion date sheet, signed", "Location details sheet"], "submission": {"case": {"name": "maintenance request IW-1228", "reference": "EG-89517"}, "documents received": ["Job request form. The form concerns maintenance request IW-1228 and shows a date of issue of 13 February 2026. 1 page. It is signed by the requesting manager.", "Cost estimate. The estimate concerns maintenance request IW-1228 and shows a date of issue of 22 February 2026. 2 pages, complete. It is signed by the estimator.", "Photographs of the fault. The photographs concern maintenance request IW-1228 and show a date of issue of 2 March 2026. 2 pages, complete.", "Planned completion date sheet. The sheet concerns maintenance request IW-1228 and shows a date of issue of 23 December 2025. 1 page. It is signed by the facilities coordinator.", "Access authorisation slip. The slip concerns maintenance request IW-1228 and shows a date of issue of 31 December 2025. 1 page. It is signed by the site security officer."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist. Consider every checklist line that applies to this case. A required document counts only when it is the kind of document listed (not a similar one), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it has not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-4", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 731}} {"id": "isc-te-00448-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Veystead Inc", "reviewer": "the rental branch counter staff", "pack": "car hire collection file", "purpose": "before a hire car is handed over at the counter", "date of the review": "24 July 2026"}, "checklist": ["Credit card in the driver's name (valid, i.e. not expired, on the date of the review, signed)", "Vehicle condition report (signed)", "Passport (valid, i.e. not expired, on the date of the review, signed)", "If the booking includes crossing a land border, also: cross-border travel permission (signed)", "Booking voucher (issued within the last 6 months)", "Insurance excess waiver certificate (valid, i.e. not expired, on the date of the review)", "Driving licence (valid, i.e. not expired, on the date of the review, signed)"], "submission": {"case": {"name": "Amelia Tadridge", "reference": "LS-38914", "details": ["The booking includes crossing a land border."]}, "documents received": ["Driving licence, Amelia Tadridge. Expiry date: 9 December 2026. 2 pages, complete. Signed by the licence holder.", "Credit card in the driver's name, Amelia Tadridge. Expiry date: 25 February 2028. Single page; the signature line is empty, so the card is not signed.", "Cross-border travel permission, Amelia Tadridge. Date of issue: 28 June 2026. Single page. Signed by the branch counter staff member.", "Insurance excess waiver certificate, Amelia Tadridge. Expiry date: 3 June 2027. 2 pages, complete.", "Booking voucher, Amelia Tadridge. Date of issue: 25 May 2026. Single page.", "Passport, Amelia Tadridge. Expiry date: 17 February 2028. Single page. Signed by the passport holder.", "Vehicle condition report, Amelia Tadridge. Date of issue: 29 April 2026. 2 pages, complete. Signed by the branch counter staff member.", "Fuel policy sheet, Amelia Tadridge. Date of issue: 12 June 2026. Single page. Signed by the branch counter staff member."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "car hire collection file", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 858}} {"id": "isc-te-00088-p1-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Aldmouth Ltd", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "23 April 2026"}, "checklist": ["Customer deposit receipt, issued within the last 3 months.", "Package holiday brochure page.", "Booking request form, signed.", "Travel insurance quote, issued within the last 1 months.", "Passport details form, signed.", "If the booking includes a car hire, also: car hire quotation, issued within the last 1 months.", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review."], "submission": {"case": {"name": "holiday booking HK-33923", "reference": "LS-73051", "details": ["The booking includes a car hire.", "The booking includes a child traveller."]}, "documents received": ["Car hire quotation for holiday booking HK-33923. Date of issue: 11 April 2026. 2 pages, complete.", "Hotel availability printout for holiday booking HK-33923. Date of issue: 5 April 2026. 2 pages, complete. Signed by the reservations clerk.", "Travel insurance quote for holiday booking HK-33923. Date of issue: 10 April 2026. 2 pages, complete.", "Customer deposit receipt for holiday booking HK-33923. Date of issue: 10 April 2026. 1 page.", "Package holiday brochure page for holiday booking HK-33923. Date of issue: 17 January 2026. 1 page.", "Passport details form for holiday booking HK-33923. Date of issue: 10 April 2026. 1 page. Signed by the customer.", "Booking request form for holiday booking HK-33923. Date of issue: 6 January 2026. 2 pages, complete. Signed by the customer.", "Flight availability printout for holiday booking HK-33923. Date of issue: 12 April 2026. 2 pages, complete.", "Child passport copy for holiday booking HK-33923. Expiry date: 20 February 2028. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "partial", "defect": "all pages present", "n_lines": 7, "n_conditional": 2, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 898}} {"id": "isc-te-00177-p2-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Vaskness Limited", "reviewer": "the reservations desk of a travel agency", "pack": "holiday booking confirmation file", "purpose": "before a holiday booking is confirmed with suppliers", "date of the review": "29 July 2026"}, "checklist": ["Flight availability printout, issued within the last 1 months", "Hotel availability printout, issued within the last 1 months, signed", "Passport details form, signed", "Special requests note, signed", "If the booking includes a child traveller, also: child passport copy, valid (not expired) on the date of the review", "Travel insurance quote, issued within the last 1 months"], "submission": {"case": {"name": "holiday booking BX-25277", "reference": "CW-76801", "details": ["The booking includes a child traveller."]}, "documents received": ["Hotel availability printout for holiday booking BX-25277, dated 17 July 2026. 2 pages, complete. Signed by the reservations manager.", "Special requests note for holiday booking BX-25277, dated 23 April 2026. 1 page. Signed by the lead traveller.", "Flight availability printout for holiday booking BX-25277, dated 12 July 2026. 2 pages, complete.", "Travel insurance quote for holiday booking BX-25277. The date of issue is obscured by an ink smudge. 2 pages, complete.", "Child passport copy for holiday booking BX-25277, showing an expiry date of 2 December 2028. 1 page.", "Passport details form for holiday booking BX-25277, dated 9 May 2026. 1 page. Signed by the lead traveller."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? That is the question to answer. Work through all checklist lines that bear on this case. For a required document to be counted, it must be the kind of document listed on the checklist (a similar document will not suffice), it must be about the case's subject, it must have all its pages present, it must be signed wherever the checklist requires a signature, it must not have expired on the date of the review, and it must have been issued inside the period the checklist allows. A conditional line applies only when the circumstance it sets out holds for the case. complete: every applicable line is met, and extra documents are irrelevant. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one line cannot be decided from what is shown, for example when a needed date, signature or page count is not visible, when a document's kind cannot be told, or when the case details do not state whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "holiday booking confirmation file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-54", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 795}} {"id": "isc-te-00431-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Ebrbrook GmbH", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "12 May 2026"}, "checklist": ["Cost-benefit justification included", "Vendor quotation included, issued within the last 3 months", "Grant fund eligibility note included, issued within the last 6 months and signed", "Equipment purchase request form included and signed", "Three quotes comparison sheet included, issued within the last 3 months and signed"], "submission": {"case": {"name": "equipment OZ-94072", "reference": "EK-69340"}, "documents received": ["Three quotes comparison sheet for equipment OZ-94072. Dated 29 April 2026. 1 page. Signed by the procurement officer.", "Vendor quotation for equipment OZ-94072. Dated 8 March 2026. 2 pages, complete.", "Grant fund eligibility note for equipment OZ-94072. Dated 14 February 2026. 1 page. Signed by the grants officer.", "Cost-benefit justification for equipment XP-14282. Dated 1 March 2026. 3 pages, complete.", "Equipment purchase request form for equipment OZ-94072. Dated 5 February 2026. 2 pages, complete. Signed by the department head."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack satisfies the checklist. Review every line of the checklist that applies here. A required document only counts if it is the type of document listed (not a similar type), it is about the subject of the case, it has all its pages, it is signed where the checklist asks for a signature, it had not expired on the date of the review, and it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-1", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 698}} {"id": "isc-te-00202-p4-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Hondstow BV", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "7 July 2026"}, "checklist": ["New floor snagging list, issued within the last 1 month and signed", "Lifting equipment inspection report, issued within the last 6 months and signed", "Furniture inventory list, issued within the last 1 month and signed", "Crate hire agreement, signed"], "submission": {"case": {"name": "office move project NU-22840", "reference": "HJ-76078"}, "documents received": ["Crate hire agreement for office move project NU-22840, dated 15 May 2026. 2 pages, complete. Signed by the crate hire supplier's representative.", "Lifting equipment inspection report for office move project NU-22840, dated 21 May 2026. 2 pages, complete. Signed by the inspection engineer.", "Furniture inventory list for office move project NU-22840, dated 25 June 2026. 4 pages, complete. Signed by the facilities coordinator.", "Movers insurance certificate for office move project NU-22840, with an expiry date of 23 October 2028. 1 page.", "New floor snagging list for office move project NU-22840, dated 25 June 2026. 3 pages, complete. Signed by the site manager.", "Furniture inventory list for office move project NU-22840, dated 30 September 2025. 4 pages, complete. Signed by the facilities coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 756}} {"id": "isc-te-00476-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Elstton Partners", "reviewer": "the line manager", "pack": "annual leave request bundle", "purpose": "before annual leave is approved and entered in the roster", "date of the review": "13 August 2026"}, "checklist": ["Leave balance statement issued within the last 3 months.", "Completed annual leave request form, signed.", "Manager approval email issued within the last 2 months.", "Return to work date confirmation.", "Statutory holiday entitlement confirmation.", "If the employee is requesting leave during a known busy period, also: business case for peak-period leave, signed.", "Team holiday planner extract."], "submission": {"case": {"name": "Khalid Sabnall", "reference": "ZF-30873", "details": ["The employee is not requesting leave during a known busy period."]}, "documents received": ["Manager approval email for Khalid Sabnall, issued 8 July 2026. Single page.", "Team holiday planner extract for Khalid Sabnall, issued 18 May 2026. 2 pages, complete.", "Completed annual leave request form for Khalid Sabnall, issued 19 June 2026. Single page, signed by the employee.", "Leave balance statement for Khalid Sabnall, issued 16 June 2026. Single page.", "Return to work date confirmation for Khalid Sabnall, issued 16 July 2026. Single page.", "Poster about holiday rights for Khalid Sabnall, issued 1 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "annual leave request bundle", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 707}} {"id": "isc-te-00257-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Pentmont Inc", "reviewer": "the head office customer relations team", "pack": "customer complaint escalation file", "purpose": "before a formal response is sent to an escalated customer complaint", "date of the review": "16 September 2026"}, "checklist": ["Policy breach summary, issued within the last 3 months, signed.", "Complaint escalation form, issued within the last 1 months, signed.", "Complaint category code sheet.", "Original complaint record, issued within the last 6 months."], "submission": {"case": {"name": "escalated complaint XT-33373", "reference": "KA-91939"}, "documents received": ["Store incident report for escalated complaint XT-33373, dated 5 July 2026. 2 pages, complete. Signed by the Store Manager.", "Policy breach summary for escalated complaint XT-33373, dated 26 August 2026. 2 pages, complete. Signed by the Customer Relations Manager.", "Complaint category code sheet for escalated complaint XT-33373, dated 27 July 2026. Single page.", "Proposed resolution letter draft for escalated complaint XT-33373, dated 21 May 2026. 2 pages, complete. Signed by the Customer Relations Manager.", "Complaint escalation form for escalated complaint XT-33373, dated 5 August 2026. 2 pages, complete. Signed by the Customer Relations Manager.", "Original complaint record for escalated complaint XT-33373, dated 8 April 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer complaint escalation file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 728}} {"id": "isc-te-00315-p2-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Haskwell Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "7 September 2026"}, "checklist": ["Obtain a financial stability statement issued within the last 12 months and signed.", "Obtain a supplier capacity declaration issued within the last 12 months and signed.", "Obtain a supplier corrective action plan issued within the last 6 months and signed.", "Obtain a supplier quality questionnaire issued within the last 12 months and signed."], "submission": {"case": {"name": "Nordlock GmbH", "reference": "XW-60086"}, "documents received": ["Scanned supplier quality questionnaire concerning Nordlock GmbH, dated 22 May 2026. 4 pages, complete. Signed by the supplier's quality manager.", "Scanned financial stability statement concerning Nordlock GmbH, dated 12 April 2026. 2 pages, complete. Signed by the supplier's finance director.", "Scanned supplier capacity declaration concerning Nordlock GmbH, dated 9 August 2026. 2 pages, complete. Signed by the supplier's operations manager.", "Scanned supplier corrective action plan concerning Nordlock GmbH, dated 23 March 2026. 3 pages, complete. Signed by the supplier's quality manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 665}} {"id": "isc-te-00266-p5-is_complete", "suite": "is_complete", "family": "travel", "state": {"context": {"organisation": "Wilmwyn Limited", "reviewer": "the accounts payable team", "pack": "expense claim bundle", "purpose": "before travel expenses are reimbursed", "date of the review": "30 April 2026"}, "checklist": ["Check that the pack contains a hotel invoice issued within the last 6 months.", "If the claim exceeds the limit that requires director sign-off, also check that the pack contains a director approval slip issued within the last 3 months and signed.", "Check that the pack contains a restaurant receipt issued within the last 6 months.", "Check that the pack contains a taxi fare receipt issued within the last 6 months.", "Check that the pack contains a currency conversion statement issued within the last 6 months."], "submission": {"case": {"name": "Xiu Knoxova", "reference": "HF-82888", "details": ["The claim is below the limit requiring director sign-off."]}, "documents received": ["Restaurant receipt for Manon Elmopoulos. Date of issue: 29 December 2025. 1 page.", "Conference fee invoice for Xiu Knoxova. Date of issue: 7 July 2025. 1 page.", "Currency conversion statement for Xiu Knoxova. Date of issue: 22 March 2026. 1 page.", "Taxi fare receipt for Xiu Knoxova. Date of issue: 27 January 2026. 1 page.", "Hotel invoice for Xiu Knoxova. Date of issue: 14 November 2025. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "travel", "pack_kind": "expense claim bundle", "test_type": "wrong", "defect": "right kind, about someone or something else", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 704}} {"id": "isc-te-00027-p3-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Nordlock BV", "reviewer": "the HR operations team", "pack": "flexible working request pack", "purpose": "before a flexible working arrangement is decided", "date of the review": "29 June 2026"}, "checklist": ["Check the line manager opinion note: it must have been issued within the last 2 months and be signed.", "Check the impact assessment on the team: it must be signed.", "Check the previous flexible working requests record: it must have been issued within the last 24 months.", "Check the current working pattern statement: it must have been issued within the last 3 months.", "Check the flexible working request form: it must be signed.", "Check the client or service impact statement: it must be signed."], "submission": {"case": {"name": "Folake Nebbski", "reference": "EQ-64109"}, "documents received": ["Impact assessment on the team about Folake Nebbski. It shows its date of issue as 29 May 2026, and it is signed by the line manager. 3 pages, complete.", "Flexible working request form about Folake Nebbski. It shows its date of issue as 14 June 2026, and it is signed by Folake Nebbski. 3 pages, complete.", "Current working pattern statement about Folake Nebbski. It shows its date of issue as 2 May 2026. It is 1 page.", "Line manager opinion note about Folake Nebbski. It shows its date of issue as 2 June 2026, and it is signed by the line manager. 2 pages, complete.", "Previous flexible working requests record about Folake Nebbski. It shows its date of issue as 18 June 2024. It is 1 page.", "Client or service impact statement about Folake Nebbski. It shows its date of issue as 7 April 2026, and it is signed by the line manager. It is 1 page."]}}, "question": {"type": "choice", "instructions": "The question is whether the pack meets the checklist. Go line by line through the checklist, covering every line relevant to this case. To count, a required document must be of the kind listed on the checklist (not a similar one), be about the subject of the case, have all its pages present, be signed wherever the checklist calls for a signature, not be expired on the date of the review, and fall within the issue period the checklist allows. A conditional line applies only when its circumstance is true for the case. complete: every applicable line is satisfied (extra documents do not matter). incomplete: one or more applicable lines are not satisfied. unclear: no applicable line is clearly unmet, yet at least one cannot be determined from what is shown, such as a needed date, signature or page count being not visible, a document's kind being impossible to tell, or the case details not stating whether a conditional line's circumstance holds while its document is absent. Bear in mind that cover notes and labels can mislead; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "flexible working request pack", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-37", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 819}} {"id": "isc-te-00480-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Zervshaw Inc", "reviewer": "the flood claims team", "pack": "flood damage claim file", "purpose": "before flood repairs are approved and a payout is calculated", "date of the review": "29 June 2026"}, "checklist": ["Photographs of flood water in the rooms, issued within the last 1 months", "Flood claim form, signed", "Loss adjuster's inspection report, issued within the last 6 months and signed", "Council flood warning notice, issued within the last 12 months", "If the property is a listed building, also: listed building consent for the repairs, signed", "Debris removal invoice, issued within the last 6 months"], "submission": {"case": {"name": "property TS-49863", "reference": "IK-32131", "details": ["The property is a listed building."]}, "documents received": ["Debris removal invoice for property TS-49863, dated 15 January 2026. 1 page.", "Listed building consent for the repairs at property TS-49863, dated 2 June 2026. 2 pages, complete. Signed by the council planning officer.", "Loss adjuster's inspection report for property TS-49863, dated 10 April 2026. 6 pages, complete. Signed by the loss adjuster.", "Photographs of flood water in the rooms relating to property TS-49863, dated 26 June 2026. 3 pages, complete.", "Council flood warning notice for property TS-49863, dated 16 August 2025. 1 page."]}}, "question": {"type": "choice", "instructions": "You must judge if the pack is complete relative to the checklist. Review each line of the checklist that has relevance to this case. To count, a required document must match the kind of document the checklist specifies (a similar one will not do), must relate to the subject of the case, must include all its pages, must be signed wherever the checklist calls for a signature, must still be valid on the review date (that is, not expired), and must have been issued during the period the checklist permits. A conditional line binds the case only if the circumstance it describes actually holds. complete: all applicable lines are satisfied, and extra documents are of no consequence. incomplete: at least one applicable line fails. unclear: no line fails outright, but at least one cannot be decided on the basis of what is displayed, for example a necessary date, signature or page count is not visible, the kind of a document cannot be told, or the case details are silent on whether a conditional line's circumstance holds while that line's document is missing. Do not rely on cover notes or labels, which may mislead; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "flood damage claim file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "variant-52", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 771}} {"id": "isc-te-00235-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Tarvcliff plc", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "1 June 2026"}, "checklist": ["Check for proof of deposit savings, issued within the last 3 months.", "Check for mortgage application form, issued within the last 3 months and signed.", "Check for property valuation report, issued within the last 3 months and signed.", "Check for gifted deposit letter, issued within the last 3 months and signed.", "If the property being bought is a flat in a shared building, also check for management company pack, issued within the last 3 months."], "submission": {"case": {"name": "Pablo Drumsall", "reference": "TQ-86071", "details": ["The property being bought is a flat in a shared building."]}, "cover note": "I am sorry the pack was put together in a rush. Please let me know if anything needs resending.", "documents received": ["Management company pack. Pack for the property being bought by Pablo Drumsall. Date of issue: 22 March 20217. 12 pages, complete.", "Proof of deposit savings. Statement in the name of Pablo Drumsall. Date of issue: 25 March 2026. 2 pages, complete.", "Property valuation report. Report prepared for Pablo Drumsall. Date of issue: 13 April 2026. 8 pages, complete. Signed by the valuer.", "Gifted deposit letter. Letter regarding Pablo Drumsall. Date of issue: 17 May 2026. 1 page. Signed by the giftor.", "Mortgage application form. Application in the name of Pablo Drumsall. Date of issue: 3 April 2026. 10 pages, complete. Signed by the borrower."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "all present", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": true, "misleading_cue": true, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 593}} {"id": "isc-te-00347-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Vaskcliff SAS", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "16 April 2026"}, "checklist": ["Check that the customer contact details sheet is present and signed.", "Check that the terms and conditions acceptance sheet is present and signed.", "Check that the identity verification document is present and valid, meaning not expired, on the date of the review.", "Check that the initial points balance statement is present and was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also check the points transfer evidence statement, which must have been issued within the last 3 months and be signed.", "Check that the marketing consent form is present and signed.", "Check that the nominated store preference form is present and signed."], "submission": {"case": {"name": "Eoin Natwick", "reference": "KR-35713", "details": ["The customer is not transferring points from any other scheme."]}, "cover note": "Please review this pack for sign-up reference KR-35713. I am not sure everything needed is there, so please check it over and let me know if anything is missing. Thanks, Rhys Daskstad", "documents received": ["nominated_store_preference_form_natwick.pdf. Nominated store preference form for Eoin Natwick, dated 25 February 2026. A single page, signed by the customer.", "marketing_consent_form_natwick.pdf. Marketing consent form for Eoin Natwick, dated 22 January 2026. A single page, signed by the customer.", "identity_verification_document_natwick_01.pdf. Identity verification document for Eoin Natwick, showing an expiry date of 3 May 2026. It is a single page.", "terms_and_conditions_acceptance_sheet_natwick.pdf. Terms and conditions acceptance sheet for Eoin Natwick, dated 22 February 2026. A single page, signed by the customer.", "customer_contact_details_sheet_natwick.pdf. Customer contact details sheet for Eoin Natwick, dated 1 January 2026. A single page, signed by the customer.", "initial_points_balance_statement_natwick.pdf. Initial points balance statement for Eoin Natwick, dated 6 April 2026. It is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "expired", "defect": "expires soon after the review (still valid)", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 888}} {"id": "isc-te-00035-p5-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Elvshaw Inc", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "1 September 2026"}, "checklist": ["Fit-out cost estimate, issued within the last 6 months and signed", "Pilot operation audit report, issued within the last 6 months and signed", "Franchise application form, signed", "Franchise disclosure document receipt, issued within the last 3 months and signed"], "submission": {"case": {"name": "Eskmouth GmbH", "reference": "WJ-35437"}, "documents received": ["Eskmouth_GmbH_franchise_disclosure_document_receipt.pdf — Franchise disclosure document receipt for Eskmouth GmbH, dated 2 August 2026. 1 page. Signed by the managing director of Eskmouth GmbH.", "Eskmouth_GmbH_fit-out_cost_estimate.pdf — Fit-out cost estimate for Eskmouth GmbH, dated 15 May 2026. 4 pages, complete. Signed by the franchisor's head of construction.", "Eskmouth_GmbH_franchise_application_form.pdf — Franchise application form for Eskmouth GmbH, dated 18 June 2026. 3 pages, complete. Signed by the managing director of Eskmouth GmbH."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 3, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 655}} {"id": "isc-te-00372-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Neskwell Group", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "19 June 2026"}, "checklist": ["Board resolution to open the account, signed.", "Proof of registered office address, issued within the last 3 months.", "Company tax registration certificate.", "Beneficial owner identification form, signed."], "submission": {"case": {"name": "Garnshaw SAS", "reference": "NQ-87354"}, "documents received": ["Board_resolution_11052026.pdf. Board resolution to open the account for Garnshaw SAS, dated 11 May 2026. It is 1 page and signed by the chairman of the board.", "Tax_registration_certificate_19042026.pdf. Company tax registration certificate for Garnshaw SAS, dated 19 April 2026. It is 1 page.", "Proof_registered_office_undated.pdf. Proof of registered office address for Garnshaw SAS. The date of issue cannot be seen, as it is covered by a stamp. It is 1 page.", "Beneficial_owner_form_19052026.pdf. Beneficial owner identification form for Garnshaw SAS, dated 19 May 2026. It has 3 pages, complete, and is signed by a director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "expired", "defect": "date not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 673}} {"id": "isc-te-00484-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Mersmore LLP", "reviewer": "the liability claims team", "pack": "liability claim against a business file", "purpose": "to assess a customer's injury claim against a shop", "date of the review": "7 September 2026"}, "checklist": ["CCTV footage stills of the incident, issued within the last 3 months", "staff training record for the duty manager, issued within the last 24 months, signed", "incident report from the day, issued within the last 3 months, signed", "photographs of the spillage on the floor, issued within the last 1 months", "If the customer has appointed a solicitor for the claim, also: letter of claim from the solicitor, issued within the last 6 months, signed", "witness statement from a staff member, signed"], "submission": {"case": {"name": "Elstvale Limited", "reference": "HM-93904"}, "cover note": "Please find attached everything needed for the pack, all complete. Shout if anything else is required. William Thornsall", "documents received": ["Incident report from the day relating to Elstvale Limited, dated 15 August 2026. 2 pages, complete. Signed by the duty manager.", "Public liability insurance schedule relating to Elstvale Limited, dated 7 June 2026. 4 pages, complete.", "Witness statement from a staff member relating to Elstvale Limited, dated 11 June 2026. 1 page. Signed by the staff member.", "Photographs of the spillage on the floor relating to Elstvale Limited, dated 20 August 2026. 1 page.", "Staff training record for the duty manager relating to Elstvale Limited, dated 11 November 2025. 2 pages, complete. Signed by the training manager.", "CCTV footage stills of the incident relating to Elstvale Limited, dated 17 July 2026. 2 pages, complete.", "Liability claim form relating to Elstvale Limited, dated 26 May 2026. 3 pages, complete. Signed by the claimant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "liability claim against a business file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00278-p3-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Wendwyn Ltd", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "7 September 2026"}, "checklist": ["Sales invoice or receipt for the sale proceeds, issued within the last 3 months.", "Signed asset disposal request form.", "Signed board or budget holder approval for the disposal.", "Signed asset de-registration and tag removal record."], "submission": {"case": {"name": "disposed asset FF-78187", "reference": "WP-26906"}, "documents received": ["Fixed asset register extract for the asset - FF-78187 - 8 July 2026. A single-page fixed asset register extract for the asset FF-78187, dated 8 July 2026.", "Board or budget holder approval for the disposal - FF-78187 - 17 May 2026. A single-page board or budget holder approval for the disposal of asset FF-78187, dated 17 May 2026, signed by a director on behalf of the board.", "Sales invoice for sale proceeds - FF-78187 - 27 July 2026. A single-page sales invoice or receipt for the sale proceeds relating to disposed asset FF-78187, dated 27 July 2026.", "Asset de-registration and tag removal record - FF-78187 - 12 August 2026. A single-page asset de-registration and tag removal record for disposed asset FF-78187, dated 12 August 2026. The signature line is empty, so the record is not signed.", "Asset disposal request form - FF-78187 - 22 July 2026. 2 pages, complete. The asset disposal request form for disposed asset FF-78187, dated 22 July 2026, signed by the requesting budget holder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "partial", "defect": "not signed", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 819}} {"id": "isc-te-00142-p3-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Maldwick Limited", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "25 March 2026"}, "checklist": ["Two-factor authentication confirmation, issued within the last 3 months.", "Content escalation route, signed.", "Account purpose statement.", "Platform terms acceptance record, signed.", "Naming convention approval, signed."], "submission": {"case": {"name": "new social media account YK-40400", "reference": "WH-23864"}, "documents received": ["YK-40400_document_2.pdf. A two-factor authentication confirmation for new social media account YK-40400, dated 15 January 2025. It is a single page.", "YK-40400_account_purpose_statement.pdf. An account purpose statement for new social media account YK-40400, dated 2 January 2026. It is a single page.", "YK-40400_naming_convention_approval.pdf. A naming convention approval for new social media account YK-40400, dated 30 December 2025. This single page is signed by the social media manager.", "YK-40400_content_escalation_route.pdf. A content escalation route for new social media account YK-40400, dated 7 December 2025. This single page is signed by the social media manager.", "YK-40400_account_closure_procedure.pdf. An account closure procedure for new social media account YK-40400, dated 28 November 2025. It is a single page.", "YK-40400_platform_terms_acceptance_record.pdf. A platform terms acceptance record for new social media account YK-40400, dated 16 March 2026. This single page is signed by the social media manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 816}} {"id": "isc-te-00083-p1-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Pravholm SAS", "reviewer": "the mobile release team", "pack": "app store release pack", "purpose": "to publish a new version of the team's mobile app to the app stores", "date of the review": "23 March 2026"}, "checklist": ["Confirm the pack contains a localisation completeness report issued within the last 1 months.", "Confirm the pack contains a store listing description issued within the last 1 months.", "Confirm the pack contains a crash-free rate report issued within the last 1 months.", "Confirm the pack contains a privacy policy update issued within the last 3 months.", "If the mobile app release adds a new payment feature, also confirm the pack contains a payment provider compliance checklist issued within the last 3 months and signed.", "Confirm the pack contains a marketing screenshot pack.", "If the mobile app release includes third-party analytics, also confirm the pack contains an analytics data consent statement issued within the last 3 months and signed.", "Confirm the pack contains an age rating questionnaire that is signed."], "submission": {"case": {"name": "mobile app release QZ-19484", "reference": "HT-41661", "details": ["The mobile app release adds a new payment feature.", "The mobile app release includes no third-party analytics."]}, "cover note": "Please find the release pack for QZ-19484 attached. Everything needed is there and complete.", "documents received": ["Crash-free rate report, mobile app release QZ-19484. Date of issue: 18 March 2026. Single page.", "Age rating questionnaire, mobile app release QZ-19484. Date of issue: 14 February 2026. 2 pages, complete. The signature block on the last page is covered by a sticky note, so it cannot be seen whether the document is signed.", "Localisation completeness report, mobile app release QZ-19484. Date of issue: 12 March 2026. 2 pages, complete.", "Privacy policy update, mobile app release QZ-19484. Date of issue: 7 January 2026. 2 pages, complete.", "Marketing screenshot pack, mobile app release QZ-19484. Date of issue: 17 March 2026. 6 pages, complete.", "Payment provider compliance checklist, mobile app release QZ-19484. Date of issue: 11 February 2026. 3 pages, complete. Signed by the team lead.", "Store listing description, mobile app release QZ-19484. Date of issue: 7 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Check the pack against the checklist and decide whether it is complete. Work through each checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), it must be about the subject of the case, it must have all its pages, it must be signed where the checklist asks for a signature, it must not have expired on the date of the review, and it must have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. Answer complete: every applicable line is met (extra documents do not matter). Answer incomplete: at least one applicable line is not met. Answer unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "app store release pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 8, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-13", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 980}} {"id": "isc-te-00481-p2-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Caelholm SAS", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "18 May 2026"}, "checklist": ["Check that the pack contains the policy machinery schedule.", "Check that the pack contains the purchase invoice for the machine.", "Check that the pack contains a signed equipment breakdown claim form.", "Check that the pack contains the machine maintenance log, issued within the last 6 months.", "Check that the pack contains the engineer's fault diagnosis report, issued within the last 3 months and signed.", "If a temporary machine was hired to keep production going, also check that the pack contains the temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Check that the pack contains the repair or replacement quotation, issued within the last 3 months."], "submission": {"case": {"name": "failed machine NT-58567", "reference": "LG-78763", "details": ["No temporary machine was hired to keep production going."]}, "documents received": ["production_downtime_log_NT-58567.pdf. Production downtime log dated 25 March 2026, signed by the production supervisor. 2 pages, complete.", "machine_maintenance_log_NT-58567.pdf. Machine maintenance log dated 30 November 2025. 5 pages, complete.", "equipment_breakdown_claim_form_NT-58567.pdf. Equipment breakdown claim form dated 8 May 2026, signed by the policyholder. 3 pages, complete.", "repair_or_replacement_quotation_NT-58567.pdf. Repair or replacement quotation dated 3 March 2026. 2 pages, complete.", "cleaning_rota_for_the_workshop_NT-58567.pdf. Cleaning rota for the workshop dated 30 November 2025. 5 pages, complete.", "engineers_fault_diagnosis_report_NT-58567.pdf. Engineer's fault diagnosis report dated 1 May 2026, signed by the diagnosing engineer. 4 pages, complete.", "photographs_of_the_failed_component_NT-58567.pdf. Photographs of the failed component dated 4 February 2026. 2 pages, complete.", "policy_machinery_schedule_NT-58567.pdf. Policy machinery schedule dated 15 April 2026. 3 pages, complete.", "purchase_invoice_NT-58567.pdf. Purchase invoice for the machine dated 26 January 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 9, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 943}} {"id": "isc-te-00132-p5-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Fravstow SAS", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "9 July 2026"}, "checklist": ["Transfer manifest, signed.", "Cross-dock slot booking sheet, issued within the last 1 months, signed.", "Damaged goods exception sheet, issued within the last 1 months, signed.", "Transfer completion confirmation, issued within the last 1 months, signed.", "Load consolidation sheet, issued within the last 3 months, signed."], "submission": {"case": {"name": "cross-dock transfer EQ-46599", "reference": "YF-29707"}, "documents received": ["Transfer completion confirmation for cross-dock transfer EQ-46599. Date of issue: 24 June 2026. 1 page. Signed by the cross-dock supervisor.", "Damaged goods exception sheet for cross-dock transfer EQ-46599. Date of issue: 27 June 2026. 1 page. Signed by the warehouse operator.", "Inbound unloading record for cross-dock transfer EQ-46599. Date of issue: 7 July 2026. 1 page. Signed by the inbound unloading supervisor.", "Load consolidation sheet for cross-dock transfer EQ-46599. Date of issue: 14 June 2026. 2 pages, complete. Signed by the load planner.", "Transfer manifest for cross-dock transfer EQ-46599. Date of issue: 13 March 2026. 3 pages, complete. Signed by the transport planner.", "Transfer completion confirmation for cross-dock transfer EQ-46599. Date of issue: 13 June 2025. 1 page. Signed by the cross-dock supervisor.", "Cross-dock slot booking sheet for cross-dock transfer EQ-46599. Date of issue: 27 June 2026. 1 page. Signed by the cross-dock coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 5, "n_conditional": 0, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 831}} {"id": "isc-te-00193-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Wilmfield SAS", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "30 March 2026"}, "checklist": ["Photo identification, valid (not expired) on the date of the review", "Lost card declaration, signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed", "Fraud questionnaire, signed", "Card replacement request form, signed", "Confirmation of contact details, issued within the last 3 months"], "submission": {"case": {"name": "Omar Tadock", "reference": "OH-47944", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["photo_id_tadock_oh47944.pdf - Photo identification for Omar Tadock. It shows an expiry date of 4 May 2027. 1 page.", "contact_details_confirmation_tadock_oh47944.pdf - Confirmation of contact details for Omar Tadock. It shows a date of issue of 11 January 2026. 1 page.", "overseas_address_form_tadock_oh47944.pdf - Temporary overseas address registration form for Omar Tadock. It shows a date of issue of 22 February 2026. 1 page, signed by Omar Tadock.", "card_replacement_request_tadock_oh47944.pdf - Card replacement request form for Omar Tadock. It shows a date of issue of 19 February 2026. 2 pages, complete. It is signed by Omar Tadock.", "lost_card_declaration_tadock_oh47944.pdf - Lost card declaration for Omar Tadock. It shows a date of issue of 19 January 2026. 1 page, with the signature line empty and not signed.", "fraud_questionnaire_tadock_oh47944.pdf - Fraud questionnaire for Omar Tadock. It shows a date of issue of 10 January 2026. 2 pages, complete. It is signed by Omar Tadock."]}}, "question": {"type": "choice", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 660}} {"id": "isc-te-00191-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Creskley Partners", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "13 August 2026"}, "checklist": ["Obtain a shareholder register extract issued within the last 3 months.", "Obtain a certificate of incorporation.", "Obtain a company tax registration certificate.", "Obtain signed company statutes.", "Obtain proof of registered office address issued within the last 3 months.", "Obtain an authorised signer identity document that is valid (not expired) on the date of the review."], "submission": {"case": {"name": "Yarvholm & Co", "reference": "LC-68396"}, "cover note": "Please could you approve this pack quickly, as all the paperwork is in order.", "documents received": ["CertificateOfIncorporation_YarvholmCo_15072026.pdf - Certificate of incorporation for Yarvholm & Co. It shows a date of issue of 15 July 2026. Single page.", "ShareholderRegisterExtract_YarvholmCo_10072026.pdf - Shareholder register extract for Yarvholm & Co. It shows a date of issue of 10 July 2026. 2 pages, complete.", "CompanyTaxRegistrationCertificate_YarvholmCo_08082026.pdf - Company tax registration certificate for Yarvholm & Co. It shows a date of issue of 8 August 2026. Single page.", "BeneficialOwnerIDForm_YarvholmCo_26062026.pdf - Beneficial owner identification form for Yarvholm & Co. It shows a date of issue of 26 June 2026. 3 pages, complete. The form is signed by the authorised signer.", "CompanyStatutes_YarvholmCo_04052026.pdf - Company statutes for Yarvholm & Co. It shows a date of issue of 4 May 2026. 12 pages, complete. The statutes are signed by the company's legal representative.", "LetterheadEnvelope_YarvholmCo_05082026.pdf - A letterhead envelope with the company name printed on it, for Yarvholm & Co. It shows a date of issue of 5 August 2026. Single page.", "AuthorisedSignerID_YarvholmCo_25062028.pdf - Authorised signer identity document for Yarvholm & Co. It shows an expiry date of 25 June 2028. Single page."]}}, "question": {"type": "choice", "instructions": "Judge the pack against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "variant-36", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 947}} {"id": "isc-te-00155-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Elvham Group", "reviewer": "the licensing team", "pack": "taxi driver licence file", "purpose": "before a taxi driver licence can be issued", "date of the review": "6 May 2026"}, "checklist": ["If the applicant has lived at an address outside the country in the last five years, also: criminal record certificate from overseas (issued within the last 3 months)", "If the applicant is applying for a hackney carriage licence rather than private hire, also: vehicle specification sheet for the hackney carriage", "Criminal record check (issued within the last 3 months)", "Right to work share code printout (issued within the last 3 months)", "Licence application form (signed)", "Driver declaration of convictions (signed)"], "submission": {"case": {"name": "Orla Bramwick", "reference": "PX-75567", "details": ["The applicant has lived at the same address in the country for the last five years.", "The applicant is applying for a hackney carriage licence rather than private hire."]}, "documents received": ["Licence application form - Orla Bramwick. Date of issue: 24 February 2026. 6 pages, complete. Signed by the applicant.", "Right to work share code printout - Orla Bramwick. Date of issue: 5 March 2026. Single page.", "Vehicle specification sheet for the hackney carriage - Orla Bramwick. Date of issue: 17 March 2026. 2 pages, complete.", "Driver declaration of convictions - Orla Bramwick. Date of issue: 27 February 2026. Single page. Signed by the driver.", "Knowledge test pass certificate - Orla Bramwick. Date of issue: 13 March 2026. Single page.", "Criminal record check - Orla Bramwick. Date of issue: 2 May 2026. 6 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "taxi driver licence file", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 792}} {"id": "isc-te-00342-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Hondhurst Group", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "6 April 2026"}, "checklist": ["If the institute hosts research involving human participants, also: ethics committee annual return (issued within the last 12 months, signed)", "doctoral researcher progress summary (issued within the last 6 months, signed)", "director's declaration of interests (issued within the last 12 months, signed)", "staffing plan (issued within the last 6 months, signed)", "annual activity report (issued within the last 6 months, signed)", "financial expenditure summary (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Oxlbury Inc", "reference": "QW-70395", "details": ["The institute hosts research involving human participants."]}, "documents received": ["ethics committee annual return.pdf — An ethics committee annual return for Oxlbury Inc, dated 10 May 2025. It runs to 2 pages, complete, and carries the signature of the ethics committee chair.", "annual activity report.pdf — An annual activity report for Oxlbury Inc, dated 31 October 2025. It runs to 12 pages, complete, and is signed by the institute director.", "doctoral researcher progress summary.pdf — A doctoral researcher progress summary for Oxlbury Inc, dated 4 January 2026. It runs to 2 pages, complete, and is signed by the doctoral researcher's supervisor.", "financial expenditure summary.pdf — A financial expenditure summary for Oxlbury Inc, dated 27 January 2026. It runs to 3 pages, complete, and is signed by the institute finance officer.", "staffing plan.pdf — A staffing plan for Oxlbury Inc, dated 24 October 2025. It runs to 2 pages, complete, and is signed by the institute director.", "directors declaration of interests.pdf — A director's declaration of interests for Oxlbury Inc, issued as a single page. The date of issue is covered by a receipt stamp, so it cannot be read. The page bears the director's signature."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "expired", "defect": "date not visible", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 857}} {"id": "isc-te-00422-p4-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Pentridge Ltd", "reviewer": "the supplier management team", "pack": "supplier performance review file", "purpose": "before the supplier's performance rating is confirmed", "date of the review": "1 May 2026"}, "checklist": ["Supplier response letter, issued within the last 3 months and signed", "Contract compliance checklist, signed", "Quality inspection report, issued within the last 6 months and signed", "If the supplier is being considered for an expanded scope, also: expanded scope assessment memo, signed", "Invoice discrepancy log", "Delivery record summary, issued within the last 12 months"], "submission": {"case": {"name": "Lombcombe BV", "reference": "RE-90972", "details": ["The supplier's scope is staying the same."]}, "documents received": ["Supplier response letter for Lombcombe BV, dated 22 January 2026. A single page, signed by the supplier's account manager.", "Contract compliance checklist for Lombcombe BV, dated 5 January 2026. 3 pages, complete. Signed by the procurement lead.", "Invoice discrepancy log for Lombcombe BV, dated 1 January 2026. 2 pages, complete.", "Delivery record summary for Lombcombe BV, dated 7 January 2026. 2 pages, complete.", "Quality inspection report for Lombcombe BV, dated 24 April 2026. 3 pages, complete. Signed by the quality inspector.", "Corrective action plan for Lombcombe BV, dated 25 February 2026. 2 pages, complete. Signed by the supplier's operations director."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "supplier performance review file", "test_type": "expired", "defect": "issued before the allowed period", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "disagreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 720}} {"id": "isc-te-00399-p3-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Bravhall GmbH", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "7 May 2026"}, "checklist": ["If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement (valid (not expired) on the date of the review, signed)", "fit-out cost estimate (issued within the last 6 months, signed)", "training course completion certificate (issued within the last 12 months)", "pilot operation audit report (issued within the last 6 months, signed)", "signed franchise agreement counterpart (signed)", "franchise disclosure document receipt (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Aldstead Group", "reference": "OF-61011"}, "documents received": ["Aldstead Group training course completion certificate.pdf. The certificate is dated 7 April 2026 and is a single page.", "Aldstead Group franchise disclosure document receipt.pdf. The receipt is dated 9 March 2026 and is a single page. It is signed by the franchisee's authorised representative.", "Aldstead Group pilot operation audit report.pdf. The report is dated 17 February 2026 and runs to 8 pages, complete. It is signed by the lead auditor.", "Aldstead Group signed franchise agreement counterpart.pdf. The counterpart is dated 9 April 2026 and runs to 12 pages, complete. It is signed by an authorised signatory of Bravhall GmbH and by Aldstead Group.", "Aldstead Group operator licence.pdf. The licence expires on 30 September 2028 and runs to 2 pages, complete.", "Aldstead Group fit-out cost estimate.pdf. The estimate is dated 12 April 2026 and runs to 4 pages, complete. It is signed by the fit-out contractor."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 794}} {"id": "isc-te-00000-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Jorbury Partners", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "17 April 2026"}, "checklist": ["Obtain the signed non-disclosure reminder acknowledgement.", "Obtain the final payroll cut-off note, issued within the last 1 months and signed.", "If the leaver held privileged administrator accounts, also obtain the privileged account revocation certificate, issued within the last 1 months and signed.", "Obtain the service desk ticket closure summary, issued within the last 1 months.", "Obtain the line manager confirmation, issued within the last 1 months and signed."], "submission": {"case": {"name": "Matthias Grubisey", "reference": "TW-20429", "details": ["The leaver held privileged administrator accounts."]}, "documents received": ["access_rights_inventory_grubisey_30mar2026.pdf — An access rights inventory for Matthias Grubisey, dated 30 March 2026. 4 pages, complete.", "service_desk_ticket_closure_summary_grubisey_11apr2026.pdf — A service desk ticket closure summary for Matthias Grubisey, dated 11 April 2026. 3 pages, complete.", "leaver_notification_form_grubisey_9apr2026.pdf — A leaver notification form for Matthias Grubisey, dated 9 April 2026. 2 pages, complete. It is signed by the line manager.", "final_payroll_cutoff_note_grubisey_2apr2026.pdf — A single-page final payroll cut-off note for Matthias Grubisey, dated 2 April 2026. It is signed by the payroll officer.", "ndc_reminder_ack_grubisey_28dec2025.pdf — A single-page non-disclosure reminder acknowledgement for Matthias Grubisey, dated 28 December 2025. It is signed by Matthias Grubisey.", "privileged_account_revocation_cert_grubisey_13apr2026.pdf — A single-page privileged account revocation certificate for Matthias Grubisey, dated 13 April 2026. It is signed by the identity and access management team lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "missing", "defect": "required document left out", "n_lines": 5, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 884}} {"id": "isc-te-00010-p5-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ilvwell & Co", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "17 June 2026"}, "checklist": ["Confirmation of contact details, issued within the last 3 months, is on file.", "Signed delivery address confirmation is on file.", "Signed signature verification record is on file.", "Signed fraud questionnaire is on file."], "submission": {"case": {"name": "Femke Gadstad", "reference": "XS-17516"}, "documents received": ["Delivery address confirmation - Femke Gadstad.pdf. Delivery address confirmation for Femke Gadstad, issued on 1 June 2026. It is 1 page and signed by the cardholder.", "File XS-17516-05.pdf. The file will not open, so its contents cannot be seen.", "Signature verification record - Femke Gadstad.pdf. Signature verification record for Femke Gadstad, issued on 25 February 2026. It is 1 page and signed by the card services officer.", "Confirmation of contact details - Femke Gadstad.pdf. Confirmation of contact details for Femke Gadstad, issued on 20 April 2026. It is 1 page.", "Fraud questionnaire - Femke Gadstad.pdf. Fraud questionnaire for Femke Gadstad, issued on 30 April 2026. It is 2 pages, complete, and signed by the cardholder."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "missing", "defect": "all present, plus an unreadable extra file", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 696}} {"id": "isc-te-00215-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Briskmore SAS", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "2 June 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include: mediation request confirmation (issued within the last 1 months, signed)", "Include: breach evidence log (issued within the last 1 months, signed)", "Include: default notice previously served (issued within the last 6 months, signed)", "Include: termination clause legal opinion (issued within the last 1 months, signed)", "Include: losses calculation statement (issued within the last 1 months, signed)", "Include: original service agreement copy", "Include: litigation hold notice (issued within the last 1 months, signed)"], "submission": {"case": {"name": "Boltley Group", "reference": "EQ-15194", "details": ["The contract requires a dispute to go to mediation first."]}, "cover note": "All the paperwork for this pack is in order, so I would be grateful for quick approval when you can.", "documents received": ["Original service agreement copy, Boltley Group, dated 22 April 2026. 10 pages, complete.", "Mediation request confirmation, Boltley Group, dated 23 May 2026. One page. Signed by the mediation provider's case administrator.", "Default notice previously served, Boltley Group, dated 31 January 2026. One page. Signed by the contract manager.", "Litigation hold notice, Boltley Group, dated 20 May 2026. 2 pages, complete. Signed by the legal counsel.", "Breach evidence log, Boltley Group, dated 19 May 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Termination notice draft, Boltley Group, dated 17 April 2026. 2 pages, complete. Signed by the relationship manager.", "Losses calculation statement, Boltley Group, dated 29 May 2026. 3 pages, complete. Signed by the finance manager.", "Cure period expiry calculation, Boltley Group, dated 13 May 2026. 2 pages, complete. Signed by the dispute resolution analyst."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Examine each checklist line that applies here. A required document counts only if it is the kind of document listed (not a similar one), relates to the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. Only when its circumstance holds for the case does a conditional line apply. 'complete': every applicable line is met (extra documents do not matter). 'incomplete': at least one applicable line is not met. 'unclear': no line is clearly unmet, yet at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels can mislead, so judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": true, "misleading_cue": true, "instructions": "variant-46", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 880}} {"id": "isc-te-00037-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Stervdale BV", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "5 May 2026"}, "checklist": ["Fit-out cost estimate, issued within the last 6 months and signed", "Pilot operation audit report, issued within the last 6 months and signed", "If the franchisee intends to operate through a company rather than as an individual, also: shareholder agreement extract, signed", "Operator licence, valid (not expired) on the date of the review", "If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement, valid (not expired) on the date of the review and signed", "Franchise application form, signed"], "submission": {"case": {"name": "Yarvcourt LLP", "reference": "AE-94886", "details": ["The franchisee intends to operate through a company rather than as an individual.", "The franchise territory does not include premises in a shopping centre."]}, "documents received": ["Operator licence - Yarvcourt LLP.pdf. An operator licence for Yarvcourt LLP, with an expiry date of 10 December 2027. 2 pages, complete.", "Training course completion certificate - Yarvcourt LLP.pdf. A training course completion certificate for Yarvcourt LLP, dated 7 February 2026. Single page.", "Shareholder agreement extract - Yarvcourt LLP.pdf. A shareholder agreement extract for Yarvcourt LLP, dated 29 January 2026. 4 pages, complete. Signed by a director of Yarvcourt LLP.", "Pilot operation audit report - Yarvcourt LLP.pdf. A pilot operation audit report for Yarvcourt LLP, dated 3 January 2026. 8 pages, complete. Signed by the pilot operation auditor.", "Franchise application form - Yarvcourt LLP.pdf. A franchise application form for Yarvcourt LLP, dated 22 January 2026. 3 pages, complete. Signed by a partner of Yarvcourt LLP.", "Fit-out cost estimate - Yarvcourt LLP.pdf. A fit-out cost estimate for Yarvcourt LLP, dated 15 November 2025. 4 pages, complete. Signed by the franchisor's fit-out manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 872}} {"id": "isc-te-00169-p5-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Vornmere Inc", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "10 June 2026"}, "checklist": ["Loyalty scheme enrolment form (signed)", "If the customer is joining as a household account with a shared card, also: household member details form (signed)", "Nominated store preference form (signed)", "Initial points balance statement (issued within the last 3 months)", "Terms and conditions acceptance sheet (signed)"], "submission": {"case": {"name": "Emily Kipaker", "reference": "LI-14145", "details": ["The customer is joining as a household account with a shared card."]}, "documents received": ["Initial points balance statement for Emily Kipaker, dated 6 April 2026. A single page.", "Terms and conditions acceptance sheet for Emily Kipaker, dated 1 March 2026. A single page, signed by the member, Emily Kipaker.", "Nominated store preference form for Emily Kipaker, dated 19 May 2026. A single page, signed by the member, Emily Kipaker.", "Loyalty scheme enrolment form for Emily Kipaker, dated 29 May 2026. A single page, signed by the member, Emily Kipaker."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 677}} {"id": "isc-te-00455-p4-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Prydwood Inc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "28 July 2026"}, "checklist": ["Check that there is an outstanding advance clearance check, signed.", "Check that there is a travel advance request form, signed.", "Check that there is an employee bank detail confirmation, issued within the last 6 months and signed.", "Check that there is a travel policy extract showing advance eligibility."], "submission": {"case": {"name": "Lotte Mabaker", "reference": "WY-52421"}, "cover note": "I have put together the pack for Lotte Mabaker, reference WY-52421, but I am not sure everything needed is there. Could you have a look and let me know if anything else is required before the advance is paid? Amelia Wadfield", "documents received": ["Travel policy extract showing advance eligibility for Lotte Mabaker, dated 8 June 2026. Single page.", "Employee bank detail confirmation for Lotte Mabaker, dated 17 July 2026. Single page, signed by the payroll officer.", "Outstanding advance clearance check for Lotte Mabaker, dated 3 May 2026. Single page, signed by the accounts payable supervisor.", "Payroll deduction agreement for recovery of the advance for Lotte Mabaker, dated 31 May 2026. Single page, signed by the payroll officer.", "Line manager approval for the advance for Lotte Mabaker, dated 11 July 2026. Single page, signed by the line manager.", "Travel advance request form for Lotte Mabaker, dated 15 May 2026. Single page, signed by the travelling employee."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "missing", "defect": "all present", "n_lines": 4, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 762}} {"id": "isc-te-00019-p1-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Xanvale LLP", "reviewer": "the course administration team", "pack": "training course booking file", "purpose": "before a place on a training course is confirmed", "date of the review": "26 March 2026"}, "checklist": ["If the course leads to a licensed qualification, also: licence eligibility declaration (signed)", "prerequisite certificate", "employer sponsorship letter (issued within the last 3 months, signed)", "cancellation policy acceptance (signed)", "payment confirmation (issued within the last 3 months)", "venue access instructions (issued within the last 3 months)", "course booking form (signed)"], "submission": {"case": {"name": "course booking HG-96006", "reference": "MZ-70767", "details": ["The course does not lead to a licensed qualification."]}, "cover note": "Please accept my apologies that this pack was put together in a rush. Kind regards, Lukas Rookova", "documents received": ["Payment confirmation for course booking HG-96006, dated 11 January 2026. Single page.", "Employer sponsorship letter for course booking HG-96006, dated 23 February 2026. Single page, signed by the employer's authorised signatory.", "Delegate photo identification for course booking HG-96006, showing an expiry date of 7 December 2027. Single page.", "Course booking form for course booking HG-96006, dated 10 January 2026. 2 pages, complete. Signed by the course booking delegate.", "Venue access instructions for course booking HG-96006, dated 17 January 2026. Single page.", "Special requirements note for course booking HG-96006, dated 19 March 2026. Single page.", "Prerequisite certificate for course booking HG-96006, dated 12 February 2026. Single page.", "Cancellation policy acceptance for course booking HG-96006, dated 24 December 2025. Single page, signed by the course booking delegate."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "training course booking file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 835}} {"id": "isc-te-00069-p4-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Pellhurst BV", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "20 July 2026"}, "checklist": ["Benefit claim form, signed and valid (not expired) on the date of the review.", "Rent book or rent payment schedule, issued within the last 2 months.", "Proof of earnings, issued within the last 1 months.", "Current tenancy agreement, signed.", "Proof of savings, issued within the last 2 months.", "Proof of national insurance number.", "If the claimant is living in temporary accommodation arranged by the council, also: temporary accommodation placement letter."], "submission": {"case": {"name": "Giulia Paskock", "reference": "ZE-16894"}, "documents received": ["Rent book or rent payment schedule for Giulia Paskock. Date of issue: 10 July 2026. 4 pages, complete.", "Proof of earnings for Giulia Paskock. Date of issue: 6 July 2026. 2 pages, complete.", "Current tenancy agreement for Giulia Paskock. Date of issue: 11 June 2026. 12 pages, complete. Signed by the claimant and the landlord.", "Benefit claim form for Giulia Paskock. Expiry date: 23 May 2028. 12 pages, complete. Signed by the claimant.", "Proof of savings for Giulia Paskock. Date of issue: 8 July 2026. 2 pages, complete.", "Proof of national insurance number for Giulia Paskock. Date of issue: 6 June 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 744}} {"id": "isc-te-00432-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Wynmark GmbH", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "14 September 2026"}, "checklist": ["Radiation safety training certificate, issued within the last 24 months and signed.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed.", "Photo identity document, valid (not expired) on the date of the review.", "Experiment safety clearance form, signed.", "Beam time or instrument booking confirmation."], "submission": {"case": {"name": "Noor Sabock", "reference": "VH-82380", "details": ["The researcher will work only during standard opening hours."]}, "documents received": ["Beam time or instrument booking confirmation for Noor Sabock, dated 8 August 2026, 1 page.", "Photo identity document for Noor Sabock, 1 page. The expiry date cannot be seen because it is covered by a stamp.", "Home institution endorsement letter for Noor Sabock, dated 10 September 2026, 1 page. It is signed by the head of Noor Sabock's home institution department.", "Radiation safety training certificate for Noor Sabock, dated 6 April 2025, 1 page. It is signed by the radiation safety officer.", "Experiment safety clearance form for Noor Sabock, dated 18 June 2026, 3 pages, complete. It is signed by the experiment safety coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 711}} {"id": "isc-te-00159-p2-is_complete", "suite": "is_complete", "family": "public sector casework", "state": {"context": {"organisation": "Dornwell Limited", "reviewer": "the benefits assessment team", "pack": "housing benefit assessment file", "purpose": "before housing benefit can be awarded", "date of the review": "3 June 2026"}, "checklist": ["Benefit claim form, valid (not expired) on the date of the review and signed", "Recent bank statements, issued within the last 2 months", "Proof of savings, issued within the last 2 months", "If the claimant is living in temporary accommodation arranged by the council, also: temporary accommodation placement letter", "Proof of identity, valid (not expired) on the date of the review", "Rent book or rent payment schedule, issued within the last 2 months"], "submission": {"case": {"name": "Seren Wadow", "reference": "SW-66484", "details": ["The claimant is living in ordinary private rented accommodation."]}, "documents received": ["Proof of identity for Seren Wadow. Expiry date shown: 29 August 2027. Single page.", "Recent bank statements for Seren Wadow. Date of issue: 25 May 2026. 12 pages, complete.", "Benefit claim form for Seren Wadow. Expiry date shown: 1 January 2027. 12 pages, complete. Signed by the claimant.", "Rent book or rent payment schedule for Seren Wadow. Date of issue: 13 April 2026. 4 pages, complete.", "Proof of savings for Seren Wadow. Date of issue: 26 May 2026. 2 pages, complete.", "Proof of national insurance number for Seren Wadow. Date of issue: 15 March 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "public sector casework", "pack_kind": "housing benefit assessment file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 750}} {"id": "isc-te-00281-p4-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Brenfell Group", "reviewer": "the card services team", "pack": "card replacement request file", "purpose": "before a replacement debit or credit card is issued", "date of the review": "31 August 2026"}, "checklist": ["Confirmation of contact details, issued within the last 3 months", "Account statement showing recent activity, issued within the last 1 months", "Delivery address confirmation, signed", "Signature verification record, signed", "Lost card declaration, signed", "If the cardholder is abroad and needs the card sent there, also: temporary overseas address registration form, signed"], "submission": {"case": {"name": "Siobhan Thornmore", "reference": "HK-69511", "details": ["The cardholder is abroad and needs the card sent there."]}, "documents received": ["Confirmation of contact details in the name of Siobhan Thornmore, dated 13 July 2026. Single page.", "Photo identification for Siobhan Thornmore, showing an expiry date of 11 April 2028. Single page.", "Signature verification record for Siobhan Thornmore, dated 22 August 2026. Single page. Signed by the bank officer who carried out the verification.", "Note about a damaged card in the name of Siobhan Thornmore, dated 9 August 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Account statement showing recent activity for Siobhan Thornmore, dated 29 August 2026. 3 pages, complete.", "Lost card declaration for Siobhan Thornmore, dated 9 August 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Delivery address confirmation for Siobhan Thornmore, dated 21 July 2026. Single page. Signed by the cardholder, Siobhan Thornmore.", "Temporary overseas address registration form for Siobhan Thornmore, dated 5 June 2026. Single page. Signed by the cardholder, Siobhan Thornmore."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "card replacement request file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 6, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 815}} {"id": "isc-te-00401-p1-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Yondwell Limited", "reviewer": "the transport planning team", "pack": "cross-dock transfer pack", "purpose": "before the transfer is confirmed as complete", "date of the review": "31 July 2026"}, "checklist": ["Inbound unloading record, issued within the last 1 months and signed.", "Transfer completion confirmation, issued within the last 1 months and signed.", "Seal number log, issued within the last 1 months and signed.", "Transfer manifest, signed.", "If the transfer includes a temperature-controlled load, also: cross-dock chiller unit check sheet, issued within the last 1 months and signed.", "Outbound loading record, issued within the last 1 months and signed.", "Cross-dock slot booking sheet, issued within the last 1 months and signed."], "submission": {"case": {"name": "cross-dock transfer MZ-75713", "reference": "QF-14367", "details": ["The transfer includes a temperature-controlled load."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["Transfer completion confirmation for cross-dock transfer MZ-75713, dated 18 July 2026, 1 page. It is signed by the transport planner.", "Seal number log for cross-dock transfer MZ-75713, dated 12 July 2026, 1 page. It is signed by the cross-dock supervisor.", "Outbound loading record for cross-dock transfer MZ-75713, dated 25 July 2026, 1 page. It is signed by the outbound loading team leader.", "Cross-dock slot booking sheet for cross-dock transfer MZ-75713, dated 11 July 2026, 1 page. It is signed by the slot booking coordinator.", "Inbound unloading record for cross-dock transfer MZ-75713, dated 10 July 2026, 1 page. It is signed by the inbound unloading team leader.", "Cross-dock chiller unit check sheet for cross-dock transfer MZ-75713, dated 28 July 2026, 1 page. It is signed by the refrigeration technician.", "Transfer manifest for cross-dock transfer MZ-75713, dated 22 May 2026, 3 pages, complete. It is signed by the transport planner.", "Picking list for a single customer order on cross-dock transfer MZ-75713, dated 22 May 2026, 3 pages, complete. It is signed by the warehouse picker."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "cross-dock transfer pack", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 964}} {"id": "isc-te-00073-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Oskbrook Inc", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "2 March 2026"}, "checklist": ["External advisory board minutes, issued within the last 12 months, signed.", "Annual activity report, issued within the last 6 months, signed.", "Doctoral researcher progress summary, issued within the last 6 months, signed.", "Director's declaration of interests, issued within the last 12 months, signed."], "submission": {"case": {"name": "Dravhaven & Co", "reference": "AO-71168"}, "cover note": "Everything needed is attached and complete. Please review the pack ahead of the committee meeting on 2 March 2026. Adaeze Daskett", "documents received": ["AO-71168_doctoral_researcher_progress_summary_2025-10-03.pdf — Doctoral researcher progress summary for Dravhaven & Co, dated 3 October 2025. Page 1 is included; no total page count is shown on the document. Signed by the institute director.", "AO-71168_publications_list_2025-09-15.pdf — Publications list for Dravhaven & Co, dated 15 September 2025. 4 pages, complete.", "AO-71168_directors_declaration_of_interests_2025-04-16.pdf — Director's declaration of interests for Dravhaven & Co, dated 16 April 2025. Single page. Signed by the institute director.", "AO-71168_annual_activity_report_2026-01-08.pdf — Annual activity report for Dravhaven & Co, dated 8 January 2026. 12 pages, complete. Signed by the institute director.", "AO-71168_external_advisory_board_minutes_2025-08-18.pdf — External advisory board minutes for Dravhaven & Co, dated 18 August 2025. 4 pages, complete. Signed by the chair of the external advisory board."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "partial", "defect": "total number of pages not shown", "n_lines": 4, "n_conditional": 0, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 865}} {"id": "isc-te-00078-p1-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Dundwyn Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "4 June 2026"}, "checklist": ["Confirm the marketing consent form is present and signed.", "Confirm the customer contact details sheet is present and signed.", "Confirm the loyalty scheme enrolment form is present and signed.", "If the customer is joining as a household account with a shared card, also: confirm the household member details form is present and signed.", "Confirm the initial points balance statement is present and was issued within the last 3 months.", "If the customer is transferring points from a rival scheme, also: confirm the points transfer evidence statement is present, was issued within the last 3 months, and is signed."], "submission": {"case": {"name": "Camille Plumopoulos", "reference": "BU-34218", "details": ["The customer is joining as a single-person account.", "The customer is transferring points from a rival scheme."]}, "documents received": ["points_transfer_evidence_statement_plumopoulos_23may2026.pdf: a single-page points transfer evidence statement about Camille Plumopoulos, dated 23 May 2026. The statement has been signed by the rival scheme administrator.", "customer_contact_details_sheet_plumopoulos_30may2026.pdf: A single-page customer contact details sheet about Camille Plumopoulos, dated 30 May 2026. The sheet carries the customer's signature.", "loyalty_scheme_enrolment_form_plumopoulos_1may2026.pdf: A single-page loyalty scheme enrolment form about Camille Plumopoulos, dated 1 May 2026. The enrolment form has been signed by the customer.", "initial_points_balance_statement_plumopoulos_21march2026.pdf: A single-page initial points balance statement about Camille Plumopoulos, dated 21 March 2026. The statement shows the starting points balance for the new loyalty account.", "points_transfer_request_plumopoulos_10may2026.pdf: A single-page points transfer request about Camille Plumopoulos, dated 10 May 2026. The request has been signed by the customer.", "marketing_consent_form_plumopoulos_31march2026.pdf: A single-page marketing consent form about Camille Plumopoulos, dated 31 March 2026. The signature line is empty, so the form is not signed."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 918}} {"id": "isc-te-00009-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Ivrwater Group", "reviewer": "the group financial controller", "pack": "fixed asset disposal file", "purpose": "before the disposal is posted to the fixed asset register", "date of the review": "31 August 2026"}, "checklist": ["Confirm the pack contains a depreciation schedule for the asset to date.", "Confirm the pack contains signed board or budget holder approval for the disposal.", "Confirm the pack contains a fixed asset register extract for the asset.", "Confirm the pack contains a sales invoice or receipt for the sale proceeds, issued within the last 3 months.", "If the asset is a company car being part-exchanged, also: confirm the pack contains a part-exchange valuation from the dealer, issued within the last 3 months."], "submission": {"case": {"name": "disposed asset VI-76793", "reference": "CJ-14842", "details": ["The asset is a company car being part-exchanged."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["Fixed asset register extract for the asset for disposed asset VI-76793, dated 17 July 2026. Single page.", "Part-exchange valuation from the dealer for disposed asset VI-76793, dated 26 June 2026. Single page.", "Depreciation schedule for the asset to date for disposed asset VI-76793, dated 17 May 2026. 2 pages, complete.", "Sales invoice or receipt for the sale proceeds for disposed asset VI-76793, dated 10 August 2026. Single page.", "Board or budget holder approval for the disposal of disposed asset VI-76793, dated 29 June 2026. Single page, signed by the group finance director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "fixed asset disposal file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 3, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 771}} {"id": "isc-te-00273-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Pravburg Group", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "11 May 2026"}, "checklist": ["Confirm the pack includes the final payroll cut-off note, issued within the last 1 months and signed.", "If the leaver is moving to a competitor, also: confidential data removal attestation, issued within the last 1 months and signed.", "Confirm the pack includes the shared mailbox handover record, issued within the last 1 months and signed.", "Confirm the pack includes the leaver notification form, signed.", "Confirm the pack includes the non-disclosure reminder acknowledgement, signed.", "Confirm the pack includes the line manager confirmation, issued within the last 1 months and signed.", "Confirm the pack includes the access rights inventory, issued within the last 1 months."], "submission": {"case": {"name": "Elena Ingmore", "reference": "CR-23529", "details": ["The leaver is not moving to a competitor."]}, "cover note": "Everything needed for this pack is attached and complete.", "documents received": ["leaver notification form – Elena Ingmore.pdf. A leaver notification form concerning Elena Ingmore, dated 30 March 2026. It runs to 2 pages, complete, and is signed by HR.", "access rights inventory – Elena Ingmore.pdf. An access rights inventory concerning Elena Ingmore, dated 5 May 2026. It runs to 4 pages, complete.", "non-disclosure reminder acknowledgement – Elena Ingmore.pdf. A non-disclosure reminder acknowledgement concerning Elena Ingmore, dated 26 March 2026. It is a single page and is signed by Elena Ingmore.", "final payroll cut-off note – Elena Ingmore.pdf. A final payroll cut-off note concerning Elena Ingmore, dated 23 April 2026. It is a single page and is signed by the payroll manager.", "line manager confirmation – Elena Ingmore (cropped copy).pdf. A line manager confirmation concerning Elena Ingmore, dated 23 April 2026. It is a single page and the part where the signature would be is cropped out of view, so it is not known whether it is signed.", "shared mailbox handover record – Elena Ingmore.pdf. A shared mailbox handover record concerning Elena Ingmore, dated 4 May 2026. It runs to 2 pages, complete, and is signed by the IT operations lead."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 917}} {"id": "isc-te-00115-p2-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Prydwyn LLP", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "7 April 2026"}, "checklist": ["Previous grievance outcome letter, issued within the last 24 months", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed", "Meeting invitation with rights explained, issued within the last 1 months", "Adjustment request record, issued within the last 3 months, signed", "If the grievance is against the employee's direct manager, also: alternative manager reporting line note, signed", "Witness list, signed", "Investigator appointment letter, issued within the last 3 months", "Grievance procedure acknowledgement, issued within the last 3 months, signed"], "submission": {"case": {"name": "Helen Zellcombe", "reference": "JL-16752", "details": ["The grievance makes no allegation of bullying.", "The grievance is against the employee's direct manager."]}, "documents received": ["Alternative manager reporting line note concerning Helen Zellcombe, dated 28 December 2025. 1 page. Signed by the alternative manager.", "Witness list concerning Helen Zellcombe, dated 1 April 2026. 1 page. Signed by the case handler.", "Investigator appointment letter concerning Helen Zellcombe, dated 2 April 2026. 1 page.", "Written grievance statement concerning Helen Zellcombe, dated 10 February 2026. 3 pages, complete. Signed by the employee.", "Meeting invitation with rights explained concerning Helen Zellcombe, dated 5 April 2026. 1 page.", "Adjustment request record concerning Helen Zellcombe, dated 10 March 2026. 1 page. Signed by the employee.", "Previous grievance outcome letter concerning Helen Zellcombe, dated 19 December 2024. 2 pages, complete.", "Grievance procedure acknowledgement concerning Helen Zellcombe, dated 17 February 2026. 1 page. Signed by the employee."]}}, "question": {"type": "choice", "instructions": "Work out if the pack is complete against the checklist. Go through all checklist lines that apply to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "missing", "defect": "all present", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "variant-3", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 839}} {"id": "isc-te-00370-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Cindford BV", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "12 August 2026"}, "checklist": ["Employment certificate, issued within the last 1 months and signed", "Photo identity document, valid (not expired) on the date of the review", "Property valuation report, issued within the last 6 months and signed", "Bank statement, issued within the last 3 months", "Credit bureau report, issued within the last 1 months", "If the property is a new build, also: new build warranty certificate"], "submission": {"case": {"name": "property YV-75629", "reference": "EX-15818", "details": ["The property is a new build."]}, "documents received": ["Proof of deposit. It concerns property YV-75629 and shows its date of issue as 1 July 2026. It is 1 page.", "Photo identity document. It concerns property YV-75629 and shows its expiry date as 4 November 2028. It is 1 page.", "Bank statement. It concerns property YV-75629 and shows its date of issue as 22 June 2026. It is 3 pages, complete.", "Property valuation report. It concerns property YV-75629 and shows its date of issue as 25 February 2026. It is 10 pages, complete, and signed by the valuer.", "Employment certificate. It concerns property YV-75629 and shows its date of issue as 28 July 2026. It is 1 page and signed by the applicant's employer.", "New build warranty certificate. It concerns property YV-75629 and shows its date of issue as 27 June 2026. It is 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "required document left out", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 804}} {"id": "isc-te-00106-p4-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Faldmark Ltd", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "6 April 2026"}, "checklist": ["Obtain the product catalogue declaration, signed.", "Obtain proof of trading address, issued within the last 3 months.", "If the seller is a sole trader rather than a company, also obtain the sole trader statutory declaration, signed.", "Obtain the authorised representative ID copy, valid (not expired) on the date of the review.", "Obtain the business registration certificate.", "Obtain the tax registration letter.", "If the seller intends to list food or cosmetic products, also obtain the safety compliance certificate, issued within the last 12 months."], "submission": {"case": {"name": "Kestcombe LLP", "reference": "JX-13298", "details": ["The seller is a sole trader rather than a company.", "The seller does not intend to list food or cosmetic products."]}, "documents received": ["anti_money_laundering_questionnaire_KestcombeLLP.pdf — Anti-money laundering questionnaire for Kestcombe LLP, dated 25 December 2025. 3 pages, complete. It is signed by an authorised signatory of Kestcombe LLP.", "business_registration_certificate_KestcombeLLP.pdf — Business registration certificate for Kestcombe LLP, dated 10 March 2026. 1 page.", "sole_trader_statutory_declaration_KestcombeLLP.pdf — Sole trader statutory declaration for Kestcombe LLP, dated 26 December 2025. 1 page. It is signed by the declarant, the sole trader of Kestcombe LLP.", "tax_return_receipt_KestcombeLLP.pdf — Tax return receipt for Kestcombe LLP, dated 23 March 2026. 1 page.", "proof_of_trading_address_KestcombeLLP.pdf — Proof of trading address for Kestcombe LLP, dated 28 February 2026. 1 page.", "product_catalogue_declaration_KestcombeLLP.pdf — Product catalogue declaration for Kestcombe LLP, dated 7 January 2026. 4 pages, complete. It is signed by an authorised signatory of Kestcombe LLP.", "authorised_representative_ID_copy_KestcombeLLP.pdf — Authorised representative ID copy for Kestcombe LLP, showing an expiry date of 8 July 2028. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 908}} {"id": "isc-te-00014-p2-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Ambton SAS", "reviewer": "the mortgage underwriting team", "pack": "mortgage application file", "purpose": "before a residential mortgage can be approved", "date of the review": "15 June 2026"}, "checklist": ["Proof of deposit, issued within the last 3 months", "Sale and purchase agreement, signed", "Credit bureau report, issued within the last 1 months", "Property valuation report, issued within the last 6 months and signed", "If the property is being bought from a family member, also: independent purchase price assessment, issued within the last 3 months and signed", "Mortgage application form, signed", "Bank statement, issued within the last 3 months"], "submission": {"case": {"name": "property NI-98706", "reference": "PN-38882", "details": ["The property is being bought from an unrelated seller."]}, "documents received": ["Property valuation report for property NI-98706. Date of issue: 12 March 2026. 10 pages, complete. Signed by the valuer.", "Sale and purchase agreement for property NI-98706. Date of issue: 17 May 2026. 9 pages, complete. Signed by the buyer and the seller.", "Bank statement for property NI-98706. Date of issue: 16 May 2026. 3 pages, complete.", "Proof of deposit for property NI-98706. Date of issue: 7 April 2026. 1 page.", "Credit bureau report for property NI-98706. Date of issue: 5 June 2026. 4 pages, complete.", "Mortgage application form for property NI-98706. Date of issue: 25 April 2026. 6 pages, complete. Signed by the applicant."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "mortgage application file", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 786}} {"id": "isc-te-00055-p2-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Pellby Group", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "19 June 2026"}, "checklist": ["Gifted deposit letter, issued within the last 3 months and signed", "If the borrower is self-employed, also: two most recent tax year overviews, issued within the last 18 months and signed", "Proof of deposit savings, issued within the last 3 months", "P60 tax summary, issued within the last 15 months", "Property valuation report, issued within the last 3 months and signed", "Mortgage application form, issued within the last 3 months and signed", "Three most recent payslips, issued within the last 3 months"], "submission": {"case": {"name": "Tyler Ebbaker", "reference": "JB-96407", "details": ["The borrower is self-employed."]}, "documents received": ["property_valuation_report.pdf. A property valuation report concerning Tyler Ebbaker, dated 31 May 2026. 8 pages, complete. It has been signed by the surveyor who carried out the valuation.", "passport.pdf. A passport concerning Tyler Ebbaker, with an expiry date of 8 April 2027. 2 pages, complete.", "tax_year_overviews.pdf. Two most recent tax year overviews concerning Tyler Ebbaker, dated 12 December 2025. 4 pages, complete. They have been signed by HM Revenue and Customs.", "mortgage_application_form.pdf. A mortgage application form concerning Tyler Ebbaker, dated 7 May 2026. 10 pages, complete. It has been signed by the applicant.", "gifted_deposit_letter.pdf. A gifted deposit letter concerning Tyler Ebbaker, dated 5 April 2026. It is a single page and has been signed by the donor of the gift.", "proof_of_deposit_savings.pdf. A proof of deposit savings concerning Tyler Ebbaker, dated 3 May 2026. 2 pages, complete.", "payslips.pdf. Three most recent payslips concerning Tyler Ebbaker, dated 14 June 2026. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "Assess the pack for completeness against the checklist. Review every checklist line that applies to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, have all its pages, be signed where the checklist asks for a signature, not have expired on the date of the review, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "variant-71", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 863}} {"id": "isc-te-00171-p4-is_complete", "suite": "is_complete", "family": "software engineering", "state": {"context": {"organisation": "Fennthorpe plc", "reviewer": "the reliability engineering team", "pack": "incident postmortem pack", "purpose": "before an incident is closed in the incident tracker", "date of the review": "3 September 2026"}, "checklist": ["Root cause analysis report, issued within the last 3 months and signed.", "If the incident was caused by a third-party service outage, also: vendor outage acknowledgement letter, issued within the last 3 months and signed.", "Follow-up owner assignment sheet, issued within the last 3 months and signed.", "If the incident involved a data leak to an outside party, also: data breach notification record, issued within the last 3 months and signed.", "Customer impact statement, issued within the last 3 months.", "Postmortem meeting minutes, issued within the last 3 months and signed.", "Remediation items list, issued within the last 3 months and signed."], "submission": {"case": {"name": "production incident NA-65901", "reference": "RU-67954", "details": ["The incident was caused entirely by internal systems.", "The incident involved a data leak to an outside party."]}, "documents received": ["NA-65901_service_level_objective_breach_record.pdf - Service level objective breach record for production incident NA-65901, dated 20 June 2026. Single page.", "NA-65901_press_release.pdf - Press release about a new product launch, dated 8 August 2026, connected to production incident NA-65901. 2 pages, complete.", "NA-65901_data_breach_notification_record.pdf - Data breach notification record for production incident NA-65901, dated 6 August 2026. 2 pages, complete. Signed by the data protection officer.", "NA-65901_incident_timeline.pdf - Incident timeline for production incident NA-65901, dated 25 July 2026. 3 pages, complete.", "NA-65901_postmortem_meeting_minutes.pdf - Postmortem meeting minutes for production incident NA-65901, dated 7 August 2026. 3 pages, complete. Signed by the chair of the postmortem meeting.", "NA-65901_root_cause_analysis_report.pdf - Root cause analysis report for production incident NA-65901, dated 4 August 2026. 5 pages, complete. Signed by the lead reliability engineer.", "NA-65901_follow_up_owner_assignment_sheet.pdf - Follow-up owner assignment sheet for production incident NA-65901, dated 31 August 2026. Single page. Signed by the incident manager.", "NA-65901_remediation_items_list.pdf - Remediation items list for production incident NA-65901, dated 6 July 2026. 2 pages, complete. Signed by the engineering manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "software engineering", "pack_kind": "incident postmortem pack", "test_type": "wrong", "defect": "similar but wrong kind of document", "n_lines": 7, "n_conditional": 2, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1028}} {"id": "isc-te-00044-p4-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Abrmouth Partners", "reviewer": "the property team", "pack": "warehouse lease file", "purpose": "before a new warehouse is taken on as a storage site", "date of the review": "2 April 2026"}, "checklist": ["Utilities connection certificate on file.", "Warehouse insurance policy on file, valid (not expired) on the date of the review.", "Planning permission on file.", "Signed lease agreement on file, signed.", "Racking inspection report on file, issued within the last 12 months and signed.", "If the warehouse site is in a flood risk area, also: flood risk assessment, signed.", "Fire safety certificate on file, valid (not expired) on the date of the review."], "submission": {"case": {"name": "warehouse UE-7753", "reference": "YO-81533"}, "documents received": ["Racking inspection report for warehouse UE-7753. Date of issue: 12 July 2025. 2 pages, complete. Signed by the racking inspector.", "Fire safety certificate for warehouse UE-7753. Expiry date: 29 November 2026. 2 pages, complete.", "Utilities connection certificate for warehouse UE-7753. Date of issue: 8 December 2025. Single page.", "Planning permission for warehouse UE-7753. Date of issue: 24 February 2026. 2 pages, complete.", "Warehouse insurance policy for warehouse UE-7753. Expiry date: 14 April 2027. 6 pages, complete.", "Signed lease agreement for warehouse UE-7753. Date of issue: 6 January 2026. 8 pages, complete. Signed by the landlord and the tenant."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "warehouse lease file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 568}} {"id": "isc-te-00388-p4-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Wilmford Inc", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "3 September 2026"}, "checklist": ["Meeting invitation with rights explained — issued within the last 1 month", "Written grievance statement — signed", "Evidence bundle index — signed", "Adjustment request record — issued within the last 3 months and signed"], "submission": {"case": {"name": "Sophie Orvaker", "reference": "RG-91668"}, "documents received": ["RG-91668_written_grievance_statement obscured_signature.pdf — Written grievance statement concerning Sophie Orvaker, dated 29 August 2026. 3 pages, complete. The signature block on the last page is covered by a sticky note, so it cannot be seen whether the document is signed.", "RG-91668_evidence_bundle_index.pdf — Evidence bundle index concerning Sophie Orvaker, dated 25 June 2026. 2 pages, complete. Signed by the employee relations team lead.", "RG-91668_meeting_invitation_rights_explained.pdf — Meeting invitation with rights explained concerning Sophie Orvaker, dated 23 August 2026. 1 page.", "RG-91668_adjustment_request_record.pdf — Adjustment request record concerning Sophie Orvaker, dated 26 July 2026. 1 page. Signed by the line manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 710}} {"id": "isc-te-00399-p4-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Bravhall GmbH", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "7 May 2026"}, "checklist": ["If the franchise territory includes premises in a shopping centre, also: shopping centre licence agreement (valid (not expired) on the date of the review, signed)", "fit-out cost estimate (issued within the last 6 months, signed)", "training course completion certificate (issued within the last 12 months)", "pilot operation audit report (issued within the last 6 months, signed)", "signed franchise agreement counterpart (signed)", "franchise disclosure document receipt (issued within the last 3 months, signed)"], "submission": {"case": {"name": "Aldstead Group", "reference": "OF-61011", "details": ["The franchise territory includes premises in a shopping centre."]}, "documents received": ["Aldstead Group training course completion certificate.pdf. The certificate is dated 7 April 2026 and is a single page.", "Aldstead Group pilot operation audit report.pdf. The report is dated 17 February 2026 and runs to 8 pages, complete. It is signed by the lead auditor.", "Aldstead Group franchise disclosure document receipt.pdf. The receipt is dated 9 March 2026 and is a single page. It is signed by the franchisee's authorised representative.", "Aldstead Group fit-out cost estimate.pdf. The estimate is dated 12 April 2026 and runs to 4 pages, complete. It is signed by the fit-out contractor.", "Aldstead Group shopping centre licence agreement.pdf. The agreement expires on 31 July 2028 and runs to 6 pages, complete. It is signed by the shopping centre manager.", "Aldstead Group franchise application form.pdf. The form is dated 3 March 2026 and runs to 3 pages, complete. It is signed by the franchisee's managing director.", "Aldstead Group signed franchise agreement counterpart.pdf. The counterpart is dated 9 April 2026 and runs to 12 pages, complete. It is signed by an authorised signatory of Bravhall GmbH and by Aldstead Group."]}}, "question": {"type": "choice", "instructions": "Assess the pack against the checklist and decide. Go through each checklist line that applies to this case. Only count a required document if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-64", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 865}} {"id": "isc-te-00345-p4-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Quorwald Ltd", "reviewer": "the loyalty programme team", "pack": "customer loyalty scheme sign-up file", "purpose": "before a customer's loyalty account is activated and points start accruing", "date of the review": "9 March 2026"}, "checklist": ["Marketing consent form, signed, on file.", "Identity verification document, valid (not expired) on the date of the review, on file.", "Loyalty scheme enrolment form, signed, on file.", "If the customer is joining as a household account with a shared card, also: household member details form, signed, on file.", "Customer contact details sheet, signed, on file.", "Points transfer request, signed, on file.", "Terms and conditions acceptance sheet, signed, on file.", "If the customer is transferring points from a rival scheme, also: points transfer evidence statement, issued within the last 3 months and signed, on file."], "submission": {"case": {"name": "Siobhan Zellson", "reference": "RV-67522", "details": ["The customer is joining as a single-person account.", "The customer is transferring points from a rival scheme."]}, "documents received": ["Customer contact details sheet for Siobhan Zellson. It shows a date of issue of 29 December 2025 and is signed by Siobhan Zellson. It is a single page.", "Points transfer evidence statement for Siobhan Zellson. It shows a date of issue of 4 March 2026 and is signed by Siobhan Zellson. It is a single page.", "Identity verification document for Siobhan Zellson. It shows an expiry date of 17 April 2027. It is a single page.", "Terms and conditions acceptance sheet for Siobhan Zellson. It shows a date of issue of 4 January 2026 and is signed by Siobhan Zellson. It is a single page.", "Points transfer request for Siobhan Zellson. It shows a date of issue of 19 February 2026 and is signed by Siobhan Zellson. It is a single page.", "Loyalty scheme enrolment form for Siobhan Zellson. It shows a date of issue of 11 January 2026 and is signed by Siobhan Zellson. It is a single page."]}}, "question": {"type": "choice", "instructions": "The decision required is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "customer loyalty scheme sign-up file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "variant-67", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 876}} {"id": "isc-te-00250-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Istfield & Co", "reviewer": "the university research committee", "pack": "research institute annual review file", "purpose": "before the institute's budget and directorate are confirmed for the coming year", "date of the review": "4 May 2026"}, "checklist": ["If the institute received industry funding above the university's disclosure threshold, also include: industry funding disclosure statement (issued within the last 12 months, signed)", "Include: director's declaration of interests (issued within the last 12 months, signed)", "Include: external advisory board minutes (issued within the last 12 months, signed)", "Include: staffing plan (issued within the last 6 months, signed)", "If the institute hosts research involving human participants, also include: ethics committee annual return (issued within the last 12 months, signed)", "Include: publications list (issued within the last 12 months)", "Include: annual activity report (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Lombfeld Ltd", "reference": "EI-33164", "details": ["The institute received industry funding above the university's disclosure threshold.", "The institute hosts research involving human participants."]}, "documents received": ["EI-33164_Industry_funding_disclosure_statement_2025-11-17.pdf - Industry funding disclosure statement for Lombfeld Ltd, dated 17 November 2025. Single page. Signed by the institute director.", "EI-33164_Publications_list_2025-09-20.pdf - Publications list for Lombfeld Ltd, dated 20 September 2025. 4 pages, complete.", "EI-33164_Ethics_committee_annual_return_2025-12-28.pdf - Ethics committee annual return for Lombfeld Ltd, dated 28 December 2025. 2 pages, complete. Signed by the ethics committee chair.", "EI-33164_Financial_expenditure_summary_2026-04-14.pdf - Financial expenditure summary for Lombfeld Ltd, dated 14 April 2026. 3 pages, complete. Signed by the finance officer.", "EI-33164_Annual_activity_report_2025-11-25.pdf - Annual activity report for Lombfeld Ltd, dated 25 November 2025. 12 pages, complete. Signed by the institute director.", "EI-33164_Directors_declaration_of_interests_2025-05-15.pdf - Director's declaration of interests for Lombfeld Ltd, dated 15 May 2025. Single page. Signed by the institute director.", "EI-33164_Staffing_plan_2026-03-31.pdf - Staffing plan for Lombfeld Ltd, dated 31 March 2026. 2 pages, complete. Signed by the institute director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research institute annual review file", "test_type": "missing", "defect": "required document left out", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1028}} {"id": "isc-te-00101-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Morvdale LLP", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "20 May 2026"}, "checklist": ["Confirm the pack includes company statutes (signed).", "Confirm the pack includes company tax registration certificate.", "Confirm the pack includes proof of registered office address (issued within the last 3 months).", "Confirm the pack includes certificate of incorporation.", "Confirm the pack includes authorised signer identity document (valid (not expired) on the date of the review).", "Confirm the pack includes beneficial owner identification form (signed).", "If the company operates in a cash-intensive trade, also: cash handling policy (signed)."], "submission": {"case": {"name": "Eskholm Ltd", "reference": "DW-46602", "details": ["The company does not operate in a cash-intensive trade."]}, "cover note": "Please accept my apologies for the state of this pack, which was put together in a rush.", "documents received": ["Eskholm Ltd - Proof of registered office address.pdf - Proof of registered office address for Eskholm Ltd, issued 17 March 2026. Single page.", "Eskholm Ltd - Company statutes.pdf - Company statutes for Eskholm Ltd, issued 28 February 2026. 12 pages, complete. Signed by the chair of the board.", "Eskholm Ltd - Company tax registration certificate.pdf - Company tax registration certificate for Eskholm Ltd, issued 4 May 2026. Single page.", "Eskholm Ltd - Authorised signer identity document.pdf - Authorised signer identity document for Eskholm Ltd, with expiry date 21 November 2026. Single page.", "Eskholm Ltd - Certificate of incorporation.pdf - Certificate of incorporation for Eskholm Ltd, issued 18 April 2026. Single page.", "Eskholm Ltd - Business name reservation receipt.pdf - Business name reservation receipt for Eskholm Ltd, issued 18 April 2026. Single page.", "Eskholm Ltd - Beneficial owner identification form.pdf - Beneficial owner identification form for Eskholm Ltd, issued 23 January 2026. 3 pages, complete. Signed by the authorised signer.", "Eskholm Ltd - Shareholder register extract.pdf - Shareholder register extract for Eskholm Ltd, issued 2 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Decide whether the pack is complete when measured against the checklist. Go over every checklist line relevant to this case. For a required document to count, it must be the kind of document listed (not a similar one), be about the subject of the case, contain all its pages, carry a signature wherever the checklist asks for one, not have expired on the date of the review, and have been issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. 'complete': all applicable lines are met (extra documents do not matter). 'incomplete': at least one applicable line is unmet. 'unclear': no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may mislead; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "variant-45", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 910}} {"id": "isc-te-00127-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Selvgate Ltd", "reviewer": "the franchisor's legal team", "pack": "franchise agreement setup file", "purpose": "before a franchise agreement is completed with a new franchisee", "date of the review": "14 April 2026"}, "checklist": ["Funding agreement from a lender, issued within the last 3 months and signed", "Franchise disclosure document receipt, issued within the last 3 months and signed", "If the franchisee intends to operate through a company rather than as an individual, also: shareholder agreement extract, signed", "Operator licence, valid (not expired) on the date of the review", "Franchise application form, signed"], "submission": {"case": {"name": "Fennburg BV", "reference": "FA-82179", "details": ["The franchisee intends to operate through a company rather than as an individual."]}, "documents received": ["FA-82179_funding_agreement_Fennburg_BV.pdf. A funding agreement from a lender concerning Fennburg BV, dated 23 February 2026, 6 pages, complete. It is signed by the lender.", "FA-82179_operator_licence_Fennburg_BV_1.pdf. An operator licence concerning Fennburg BV, 2 pages, complete. Its date of issue is obscured by a stamp across the corner.", "FA-82179_franchise_application_form_Fennburg_BV.pdf. A franchise application form concerning Fennburg BV, dated 26 January 2026, 3 pages, complete. It is signed by the franchisee's director.", "FA-82179_franchise_disclosure_document_receipt_Fennburg_BV.pdf. A franchise disclosure document receipt concerning Fennburg BV, dated 12 February 2026, one page. It is signed by the franchisor's authorised officer.", "FA-82179_fit-out_cost_estimate_Fennburg_BV.pdf. A fit-out cost estimate concerning Fennburg BV, dated 20 February 2026, 4 pages, complete. It is signed by the franchisor's fit-out coordinator.", "FA-82179_shareholder_agreement_extract_Fennburg_BV.pdf. A shareholder agreement extract concerning Fennburg BV, dated 11 March 2026, 4 pages, complete. It is signed by the company's shareholders.", "FA-82179_pilot_operation_audit_report_Fennburg_BV.pdf. A pilot operation audit report concerning Fennburg BV, dated 24 February 2026, 8 pages, complete. It is signed by the auditor."]}}, "question": {"type": "choice", "instructions": "Ask yourself: does the pack match the checklist? Review each line of the checklist that is relevant to this case. A required document only counts if it is the kind of document the list names (not a similar one), is about the case subject, has all its pages, is signed in every place the checklist asks for a signature, was not expired on the review date, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for this case. complete: all applicable lines are met, and extra documents do not matter. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, yet at least one line cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "franchise agreement setup file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "variant-61", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 949}} {"id": "isc-te-00029-p1-is_complete", "suite": "is_complete", "family": "human resources", "state": {"context": {"organisation": "Ebrmoor BV", "reviewer": "the employee relations team", "pack": "grievance hearing pack", "purpose": "before a formal grievance hearing takes place", "date of the review": "17 July 2026"}, "checklist": ["Investigator appointment letter, issued within the last 3 months", "Grievance procedure acknowledgement, issued within the last 3 months and signed", "Evidence bundle index, signed", "Meeting invitation with rights explained, issued within the last 1 months", "Previous grievance outcome letter, issued within the last 24 months", "Written grievance statement, signed", "If the grievance alleges bullying by a named colleague, also: bullying allegation evidence log, signed"], "submission": {"case": {"name": "Daan Ustett", "reference": "GC-91390", "details": ["The grievance makes no allegation of bullying."]}, "documents received": ["Grievance procedure acknowledgement. Acknowledgement about Daan Ustett dated 15 May 2026. Single page, signed by Daan Ustett.", "Written grievance statement. Statement about Daan Ustett dated 4 April 2026. 3 pages, complete, signed by Daan Ustett.", "Investigator appointment letter. Letter about Daan Ustett dated 17 May 2026. Single page.", "Evidence bundle index. Index about Daan Ustett dated 23 March 2026. 2 pages, complete, signed by the case investigator.", "Witness list. List about Daan Ustett dated 4 June 2026. Single page, signed by the case investigator.", "Adjustment request record. Record about Daan Ustett dated 23 May 2026. Single page, signed by Daan Ustett.", "Previous grievance outcome letter. Letter about Daan Ustett dated 19 December 2024. 2 pages, complete.", "Meeting invitation with rights explained. Invitation about Daan Ustett dated 3 July 2026. Single page."]}}, "question": {"type": "choice", "instructions": "Assess whether the pack fulfils the checklist. Work through every checklist line relevant to this case. For a required document to count, it must be the kind of document the checklist lists (a similar one will not do), be about the subject of the case, have all its pages, be signed in every place the checklist requires a signature, not have expired on the review date, and have been issued within the period the checklist allows. Conditional lines apply only when their circumstance holds for the case. complete: every applicable line is met (extra documents are of no consequence). incomplete: one or more applicable lines are not met. unclear: no line is clearly unmet, but at least one cannot be settled from what is shown, for instance when a needed date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may prove misleading; evaluate the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "human resources", "pack_kind": "grievance hearing pack", "test_type": "conditional", "defect": "circumstance does not hold, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-38", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 834}} {"id": "isc-te-00215-p2-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Briskmore SAS", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "2 June 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include: mediation request confirmation (issued within the last 1 months, signed)", "Include: breach evidence log (issued within the last 1 months, signed)", "Include: default notice previously served (issued within the last 6 months, signed)", "Include: termination clause legal opinion (issued within the last 1 months, signed)", "Include: losses calculation statement (issued within the last 1 months, signed)", "Include: original service agreement copy", "Include: litigation hold notice (issued within the last 1 months, signed)"], "submission": {"case": {"name": "Boltley Group", "reference": "EQ-15194", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Mediation request confirmation, Boltley Group, dated 23 May 2026. One page. Signed by the mediation provider's case administrator.", "Breach evidence log, Boltley Group, dated 19 May 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Termination clause legal opinion, Boltley Group, dated 29 May 2026. 5 pages, complete. Signed by external counsel.", "Litigation hold notice, Boltley Group, dated 20 May 2026. 2 pages, complete. Signed by the legal counsel.", "Losses calculation statement, Boltley Group, dated 29 May 2026. 3 pages, complete. Signed by the finance manager.", "Default notice previously served, Boltley Group, dated 31 January 2026. One page. Signed by the contract manager.", "Original service agreement copy, Boltley Group, dated 22 April 2026. 10 pages, complete."]}}, "question": {"type": "choice", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "missing", "defect": "all present", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 624}} {"id": "isc-te-00228-p3-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Lindcourt & Co", "reviewer": "the quality management office", "pack": "customer audit hosting pack", "purpose": "to host a customer audit of the factory without findings for missing documents", "date of the review": "15 May 2026"}, "checklist": ["Training matrix extract, issued within the last 3 months, signed.", "Calibration status summary, issued within the last 1 months, signed.", "Layout tour plan, signed.", "Audit scope statement, signed.", "Audit agenda, signed.", "Document control list, issued within the last 3 months, signed."], "submission": {"case": {"name": "customer audit visit HY-50028", "reference": "PO-24718"}, "cover note": "Hi, sending over the pack for customer audit visit HY-50028 under reference PO-24718. A colleague has already checked it, but do let me know if anything else is needed. Best regards, Elif", "documents received": ["HY-50028_previous_audit_findings_closure_file.pdf. Previous audit findings closure file for customer audit visit HY-50028, dated 25 January 2026. 6 pages, complete, with a signature from the Quality Manager.", "HY-50028_layout_tour_plan.pdf. Layout tour plan for customer audit visit HY-50028, dated 8 February 2026. Single page, with a signature from the Facilities Supervisor.", "HY-50028_open_corrective_action_list.pdf. Open corrective action list for customer audit visit HY-50028, dated 3 May 2026. 2 pages, complete, with a signature from the Quality Manager.", "HY-50028_calibration_status_summary.pdf. Calibration status summary for customer audit visit HY-50028, dated 5 May 2026. 2 pages, complete, with a signature from the Quality Manager.", "HY-50028_document_control_list.pdf. Document control list for customer audit visit HY-50028, dated 20 March 2026. 4 pages, complete, but a sticky note covers the signature block, so it cannot be seen whether it is signed.", "HY-50028_audit_scope_statement.pdf. Audit scope statement for customer audit visit HY-50028, dated 7 March 2026. Single page, with a signature from the Quality Manager.", "HY-50028_audit_agenda.pdf. Audit agenda for customer audit visit HY-50028, dated 28 March 2026. Single page, with a signature from the Quality Manager.", "HY-50028_training_matrix_extract.pdf. Training matrix extract for customer audit visit HY-50028, dated 12 May 2026. 3 pages, complete, with a signature from the Training Coordinator."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "customer audit hosting pack", "test_type": "partial", "defect": "signature not visible", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 1012}} {"id": "isc-te-00195-p3-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Pellside LLP", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "3 March 2026"}, "checklist": ["Authorised representative ID copy, valid (not expired) on the date of the review", "Tax registration letter", "Anti-money laundering questionnaire, signed", "Proof of trading address, issued within the last 3 months", "If the seller intends to list food or cosmetic products, also: safety compliance certificate, issued within the last 12 months", "Business registration certificate", "Product catalogue declaration, signed", "If the seller is a sole trader rather than a company, also: sole trader statutory declaration, signed"], "submission": {"case": {"name": "Quelmouth Inc", "reference": "JT-56871", "details": ["The seller intends to list food or cosmetic products.", "The seller is a sole trader rather than a company."]}, "documents received": ["safety_compliance_certificate.pdf — Safety compliance certificate for Quelmouth Inc. The date of issue is 17 September 2025. 2 pages, complete.", "bank_account_verification_letter.pdf — Bank account verification letter for Quelmouth Inc. The date of issue is 27 December 2025. 1 page. It is signed by the bank.", "tax_registration_letter.pdf — Tax registration letter for Quelmouth Inc. The date of issue is 7 January 2026. 1 page.", "sole_trader_statutory_declaration.pdf — Sole trader statutory declaration for Quelmouth Inc. The date of issue is 11 November 2025. 1 page. It is signed by the seller.", "anti_money_laundering_questionnaire.pdf — Anti-money laundering questionnaire for Quelmouth Inc. The date of issue is 18 January 2026. 3 pages, complete. It is signed by the authorised representative.", "business_registration_certificate.pdf — Business registration certificate for Quelmouth Inc. The date of issue is 9 January 2026. 1 page.", "product_catalogue_declaration.pdf — Product catalogue declaration for Quelmouth Inc. The date of issue is 16 February 2026. 4 pages, complete. It is signed by the authorised representative.", "authorised_representative_ID_copy.pdf — Authorised representative ID copy for Quelmouth Inc. The expiry date shown is 6 March 2027. 1 page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "missing", "defect": "required document left out", "n_lines": 8, "n_conditional": 2, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 907}} {"id": "isc-te-00473-p3-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Uldberg Partners", "reviewer": "the facilities helpdesk", "pack": "maintenance job ticket pack", "purpose": "before a job is passed to a trade team", "date of the review": "21 May 2026"}, "checklist": ["Planned completion date sheet, signed.", "Access authorisation slip, signed.", "If the job involves working at height above 2 metres, also: permit to work at height, issued within the last 1 months and signed.", "Parts order confirmation, issued within the last 1 months.", "Photographs of the fault, issued within the last 3 months.", "Job request form, signed."], "submission": {"case": {"name": "maintenance request NO-34425", "reference": "UR-51642", "details": ["The job involves working at height above two metres."]}, "documents received": ["Permit to work at height for maintenance request NO-34425. Dated 1 May 2026. 1 page. Signed by the issuing supervisor.", "Access authorisation slip for maintenance request NO-34425. Dated 9 May 2026. 1 page. Signed by the site access coordinator.", "Planned completion date sheet for maintenance request NO-34425. Dated 21 February 2026. 1 page. Signed by the facilities manager.", "Job request form for maintenance request NO-34425. Dated 3 February 2026. 1 page. Signed by the requesting tenant's site contact.", "Parts order confirmation for maintenance request NO-34425. Dated 5 May 2026. 1 page.", "Risk assessment for the task under maintenance request NO-34425. Dated 19 March 2026. 5 pages, complete. Signed by the assessing duty manager.", "Photographs of the fault for maintenance request NO-34425. Dated 24 March 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "maintenance job ticket pack", "test_type": "partial", "defect": "signed", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 814}} {"id": "isc-te-00098-p1-is_complete", "suite": "is_complete", "family": "accounting and audit", "state": {"context": {"organisation": "Wynbury Inc", "reviewer": "the accounts payable team", "pack": "expenses advance request file", "purpose": "before a travel advance is paid to the employee", "date of the review": "6 May 2026"}, "checklist": ["Confirm the costed trip estimate sheet is present, was issued within the last 3 months, and is signed.", "If the requested advance is above the standard advance limit, also: confirm finance director approval for the higher advance is present and signed.", "If the trip involves travel to another country, also: confirm foreign travel authorisation from a director is present and signed.", "Confirm the outstanding advance clearance check is present and signed.", "Confirm the payroll deduction agreement for recovery of the advance is present and signed.", "Confirm the employee bank detail confirmation is present, was issued within the last 6 months, and is signed.", "Confirm the travel policy extract showing advance eligibility is present."], "submission": {"case": {"name": "Helen Tadton", "reference": "AX-34121", "details": ["The requested advance is within the standard advance limit.", "The trip involves travel to another country."]}, "documents received": ["payroll_deduction_agreement_Tadton.pdf. A payroll deduction agreement for recovery of the advance for Helen Tadton, dated 2 April 2026, on a single page. Its signature line is empty, so the document is not signed.", "foreign_travel_authorisation_Tadton.pdf. A foreign travel authorisation from a director for Helen Tadton, dated 1 May 2026, on a single page. It is signed by the authorising director, Kavell Renner.", "costed_trip_estimate_Tadton.pdf. A costed trip estimate sheet for Helen Tadton, dated 24 March 2026, on a single page. It is signed by the travelling employee, Helen Tadton.", "travel_policy_extract_Tadton.pdf. A travel policy extract showing advance eligibility, dated 19 January 2026, on a single page, relating to Helen Tadton.", "outstanding_advance_clearance_Tadton.pdf. An outstanding advance clearance check for Helen Tadton, dated 26 March 2026, on a single page. It is signed by the accounts payable reviewer, Morwen Delacourt.", "bank_detail_confirmation_Tadton.pdf. An employee bank detail confirmation for Helen Tadton, dated 25 November 2025, on a single page. It is signed by the payroll officer, Joss Abidemi."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "accounting and audit", "pack_kind": "expenses advance request file", "test_type": "partial", "defect": "not signed", "n_lines": 7, "n_conditional": 2, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-65", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 909}} {"id": "isc-te-00317-p1-is_complete", "suite": "is_complete", "family": "manufacturing quality", "state": {"context": {"organisation": "Brenwyn Ltd", "reviewer": "the supplier quality team", "pack": "supplier qualification file", "purpose": "before a new supplier is added to the approved vendor list", "date of the review": "20 August 2026"}, "checklist": ["Obtain a financial stability statement, issued within the last 12 months and signed.", "Obtain a raw material certificate of analysis, issued within the last 6 months and signed.", "Obtain a supplier self-assessment report, issued within the last 12 months and signed.", "Obtain a supplier audit report, issued within the last 24 months and signed.", "Obtain a supplier capacity declaration, issued within the last 12 months and signed.", "Obtain a supplier quality questionnaire, issued within the last 12 months and signed."], "submission": {"case": {"name": "Haskbury BV", "reference": "CB-19498"}, "documents received": ["Haskbury_BV_Supplier_Audit_Report_2024.pdf - Supplier audit report for Haskbury BV, dated 29 August 2024. 8 pages, complete. Signed by the lead auditor.", "Haskbury_BV_Capacity_Declaration.pdf - Supplier capacity declaration for Haskbury BV, dated 18 September 2025. 2 pages, complete. Signed by the supplier's operations director.", "File_0147.pdf - The file will not open, so its contents cannot be seen.", "Haskbury_BV_Corrective_Action_Plan.pdf - Supplier corrective action plan for Haskbury BV, dated 9 April 2026. 3 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Self_Assessment_Report.pdf - Supplier self-assessment report for Haskbury BV, dated 3 August 2026. 6 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Raw_Material_CoA.pdf - Raw material certificate of analysis for Haskbury BV, dated 8 April 2026. 2 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_Quality_Questionnaire.pdf - Supplier quality questionnaire for Haskbury BV, dated 2 October 2025. 4 pages, complete. Signed by the supplier's quality manager.", "Haskbury_BV_QMS_Certificate.pdf - Certified quality management system certificate for Haskbury BV, expiring 29 June 2028. Single page.", "Haskbury_BV_Financial_Stability_Statement.pdf - Financial stability statement for Haskbury BV, dated 21 May 2026. 2 pages, complete. Signed by the chief financial officer of Haskbury BV."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "manufacturing quality", "pack_kind": "supplier qualification file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 6, "n_conditional": 0, "n_documents": 9, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 969}} {"id": "isc-te-00334-p3-is_complete", "suite": "is_complete", "family": "procurement and invoices", "state": {"context": {"organisation": "Larvby Inc", "reviewer": "the vendor management team", "pack": "new supplier onboarding file", "purpose": "before the supplier can be set up for orders and payments", "date of the review": "5 June 2026"}, "checklist": ["Signed copy of the general terms and conditions, with the supplier's signature in place.", "Certificate of incorporation.", "Company tax clearance certificate, valid and not expired on the date of the review.", "Supplier declaration of no conflicts of interest, with the supplier's signature in place.", "If the supplier is a small business with a single owner, also: copy of the owner's photo identification, valid and not expired on the date of the review.", "Supplier registration form, with the supplier's signature in place.", "Bank details confirmation letter, issued within the last 3 months and with the supplier's signature in place."], "submission": {"case": {"name": "Marlcourt LLP", "reference": "BT-69198"}, "documents received": ["Supplier declaration of no conflicts of interest for Marlcourt LLP, dated 23 May 2026. The declaration is signed by a partner of Marlcourt LLP. Single page.", "Bank details confirmation letter for Marlcourt LLP, dated 23 April 2026. The letter is signed by a partner of Marlcourt LLP. Single page.", "Signed copy of the general terms and conditions for Marlcourt LLP, dated 18 February 2026. The document is signed by a partner of Marlcourt LLP. 6 pages, complete.", "Certificate of incorporation for Marlcourt LLP, dated 9 February 2026. 2 pages, complete.", "Company tax clearance certificate for Marlcourt LLP, with an expiry date of 24 March 2028. Single page.", "Anti-bribery policy statement for Marlcourt LLP, dated 24 March 2026. The statement is signed by a partner of Marlcourt LLP. 2 pages, complete.", "Copy of the owner's photo identification for Marlcourt LLP, with an expiry date of 22 September 2027. Single page.", "Supplier registration form for Marlcourt LLP, dated 1 March 2026. The form is signed by a partner of Marlcourt LLP. 3 pages, complete."]}}, "question": {"type": "choice", "instructions": "The question to answer is whether the pack stands complete against the checklist. Work through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "procurement and invoices", "pack_kind": "new supplier onboarding file", "test_type": "conditional", "defect": "document present (circumstance not stated)", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "variant-63", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 877}} {"id": "isc-te-00077-p2-is_complete", "suite": "is_complete", "family": "retail and e-commerce", "state": {"context": {"organisation": "Elstham SAS", "reviewer": "the payments and IT security team", "pack": "online payment gateway integration file", "purpose": "before a new payment gateway can accept live customer payments", "date of the review": "17 July 2026"}, "checklist": ["Payment gateway technical specification for the gateway, on file.", "If the gateway will store customers' card details, also: card storage compliance certificate, valid (not expired) on the date of the review.", "Test environment transaction log, issued within the last 1 months.", "Data protection impact assessment, issued within the last 12 months, signed.", "Gateway integration request form, signed."], "submission": {"case": {"name": "payment gateway FY-30649", "reference": "NK-85955", "details": ["The gateway will not store customers' card details."]}, "documents received": ["Gateway integration request form for payment gateway FY-30649, dated 9 April 2026, signed by the requesting manager. 2 pages, complete.", "Data protection impact assessment for payment gateway FY-30649, dated 12 October 2025, signed by the Data Protection Officer. 5 pages, complete.", "Payment gateway technical specification for payment gateway FY-30649, dated 28 March 2026. 8 pages, complete.", "Test environment transaction log for payment gateway FY-30649; the date of issue is covered by a stamp and cannot be read. 4 pages, complete.", "Go-live sign-off certificate for payment gateway FY-30649, dated 28 June 2026, signed by the Head of Payments. Single page."]}}, "question": {"type": "choice", "instructions": "Answer this: does the pack satisfy the checklist in full? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), if it is about the case's subject, if it has all its pages, if it is signed wherever the checklist asks for a signature, if it has not expired on the date of the review, and if it was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Judge the documents themselves, since cover notes and labels may be misleading.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "retail and e-commerce", "pack_kind": "online payment gateway integration file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 5, "verified": false, "misleading_cue": false, "instructions": "variant-57", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 753}} {"id": "isc-te-00180-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Weskfield SAS", "reviewer": "the network security team", "pack": "network firewall change pack", "purpose": "before a firewall rule change is applied in production", "date of the review": "24 July 2026"}, "checklist": ["Confirm the pack includes the rollback plan, signed.", "Confirm the pack includes the firewall change request form, signed.", "Confirm the pack includes the current rule set export, issued within the last 1 months.", "Confirm the pack includes the peer review checklist, issued within the last 1 months, signed."], "submission": {"case": {"name": "firewall change GH-61214", "reference": "TJ-47386"}, "documents received": ["current_rule_set_export_GH-61214.pdf — Current rule set export for firewall change GH-61214, dated 11 July 2026. 8 pages, complete.", "peer_review_checklist_GH-61214.pdf — Peer review checklist for firewall change GH-61214, dated 13 July 2026. Single page. Signed by the peer reviewer.", "proposed_rule_change_spec_GH-61214.pdf — Proposed rule change specification for firewall change GH-61214, dated 3 June 2026. 2 pages, complete. Signed by the network engineer who prepared the specification.", "firewall_change_request_GH-61214.pdf — Firewall change request form for firewall change GH-61214, dated 13 July 2026. 3 pages, complete. Signed by the requesting change manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "network firewall change pack", "test_type": "missing", "defect": "required document left out", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 726}} {"id": "isc-te-00379-p5-is_complete", "suite": "is_complete", "family": "customer support", "state": {"context": {"organisation": "Eskhall SAS", "reviewer": "the seller vetting team", "pack": "seller onboarding file", "purpose": "before a seller account is allowed to trade", "date of the review": "8 July 2026"}, "checklist": ["If the seller intends to list food or cosmetic products, also include: safety compliance certificate (issued within the last 12 months)", "Include: proof of trading address (issued within the last 3 months)", "Include: tax registration letter", "Include: bank account verification letter (issued within the last 3 months, signed)", "Include: anti-money laundering questionnaire (signed)", "Include: business registration certificate", "Include: authorised representative ID copy (valid (not expired) on the date of the review)"], "submission": {"case": {"name": "Hondhall plc", "reference": "TW-57851"}, "documents received": ["Tax registration letter – Hondhall plc. Date of issue: 12 May 2026. 1 page.", "Anti-money laundering questionnaire – Hondhall plc. Date of issue: 23 March 2026. 3 pages, complete. Signed by the company's compliance officer.", "Business registration certificate – Hondhall plc. Date of issue: 28 April 2026. 1 page.", "Authorised representative ID copy – Hondhall plc. Expiry date: 18 December 2028. 1 page.", "Proof of trading address – Hondhall plc. Date of issue: 30 May 2026. 1 page.", "Bank account verification letter – Hondhall plc. Date of issue: 17 May 2026. 1 page. Signed by the bank's account manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "customer support", "pack_kind": "seller onboarding file", "test_type": "conditional", "defect": "circumstance not stated, document absent", "n_lines": 7, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 739}} {"id": "isc-te-00392-p1-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Ambstead SAS", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "10 September 2026"}, "checklist": ["Production downtime log, issued within the last 3 months and signed.", "Photographs of the failed component.", "Policy machinery schedule.", "If a temporary machine was hired to keep production going, also: temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Equipment breakdown claim form, signed."], "submission": {"case": {"name": "failed machine VR-6417", "reference": "NN-62631", "details": ["No temporary machine was hired to keep production going."]}, "documents received": ["Policy_machinery_schedule_VR-6417.pdf. This policy machinery schedule for failed machine VR-6417 is dated 3 July 2026 and runs to 3 pages, complete.", "Equipment_breakdown_claim_form_VR-6417.pdf. This equipment breakdown claim form for failed machine VR-6417 is dated 25 May 2026 and is 3 pages, complete. The form is signed by the policyholder.", "Photographs_of_failed_component_VR-6417.pdf. These photographs of the failed component of machine VR-6417 are dated 12 July 2026 and come as 2 pages, complete.", "Production_downtime_log_VR-6417.pdf. This production downtime log for failed machine VR-6417 is 2 pages, complete. The date of issue is smudged and cannot be read. The log is signed by the production supervisor."]}}, "question": {"type": "choice", "instructions": "The task is to determine if the pack meets the checklist. Examine every checklist line that applies here. For a required document to count, it must be the exact kind of document listed and not merely similar, it must relate to the subject of the case, it must have all pages present, it must be signed wherever the checklist demands a signature, it must not have expired by the review date, and it must have been issued inside the period the checklist allows. Conditional lines apply only when their circumstance holds for this case. complete: every applicable line is met; extra documents make no difference. incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a required date, signature or page count is not visible, a document's kind cannot be identified, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading, so judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 1, "n_documents": 4, "verified": false, "misleading_cue": false, "instructions": "variant-60", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 755}} {"id": "isc-te-00182-p1-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Faldfell Ltd", "reviewer": "the infrastructure operations team", "pack": "server decommissioning pack", "purpose": "before a server is removed from service and disposed of", "date of the review": "11 March 2026"}, "checklist": ["Licence reassignment note issued within the last 3 months, signed.", "Asset register update issued within the last 1 months.", "Data wipe certificate issued within the last 3 months, signed.", "Final backup confirmation issued within the last 3 months, signed.", "Decommission request form, signed."], "submission": {"case": {"name": "retired server ZL-17533", "reference": "WS-76990"}, "cover note": "Apologies for the rush with which this pack was assembled. Kind regards, Sanne Wraxwell", "documents received": ["Decommission request form for retired server ZL-17533, dated 19 December 2025, 2 pages, complete, signed by the requesting system owner.", "Single-page licence reassignment note for retired server ZL-17533, dated 16 December 2025, signed by the licence administrator.", "File scan_0001.pdf: the file will not open, so its contents cannot be seen.", "Single-page final backup confirmation for retired server ZL-17533, dated 18 February 2026, signed by the backup operator.", "Single-page data wipe certificate for retired server ZL-17533, dated 22 February 2026, signed by the data sanitisation technician.", "Single-page asset register update for retired server ZL-17533, dated 8 March 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. The answer is complete when every applicable line is met (extra documents do not matter). The answer is incomplete when at least one applicable line is not met. The answer is unclear when no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "server decommissioning pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": true, "misleading_cue": true, "instructions": "variant-26", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 759}} {"id": "isc-te-00164-p4-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Pellwick Group", "reviewer": "the facility user office", "pack": "research facility access badge file", "purpose": "before the researcher can be issued an access badge for the facility", "date of the review": "15 April 2026"}, "checklist": ["Facility access application form, signed.", "If the researcher will work outside standard opening hours, also: out-of-hours access authorisation, signed.", "Beam time or instrument booking confirmation.", "Insurance declaration for facility work, issued within the last 12 months, signed.", "Home institution endorsement letter, issued within the last 6 months, signed.", "Experiment safety clearance form, signed."], "submission": {"case": {"name": "Madison Harvberg", "reference": "HI-86494", "details": ["The researcher will work outside standard opening hours."]}, "documents received": ["home_institution_endorsement_letter_harvberg.pdf. A home institution endorsement letter for Madison Harvberg, dated 11 December 2025. It is a single page and is signed by the home institution's head of department.", "facility_access_application_form_harvberg.pdf. A facility access application form for Madison Harvberg, dated 23 February 2026. 2 pages, complete. It is signed by the facility manager.", "beam_time_booking_confirmation_harvberg.pdf. A beam time or instrument booking confirmation for Madison Harvberg, dated 25 December 2025. It is a single page.", "insurance_declaration_facility_work_harvberg.pdf. An insurance declaration for facility work for Madison Harvberg, dated 29 April 2025. It is a single page and is signed by the home institution's insurance officer.", "out_of_hours_access_authorisation_harvberg.pdf. An out-of-hours access authorisation for Madison Harvberg, dated 21 March 2026. It is a single page and is signed by the facility manager.", "experiment_safety_clearance_form_harvberg.pdf. An experiment safety clearance form for Madison Harvberg, dated 8 April 2026. 3 pages, complete. It is signed by the facility safety officer."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "research facility access badge file", "test_type": "conditional", "defect": "document present (circumstance holds)", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 840}} {"id": "isc-te-00013-p1-is_complete", "suite": "is_complete", "family": "banking", "state": {"context": {"organisation": "Bravston Partners", "reviewer": "the business onboarding team", "pack": "business account opening file", "purpose": "before a business current account can be opened", "date of the review": "18 September 2026"}, "checklist": ["Shareholder register extract, issued within the last 3 months.", "Proof of registered office address, issued within the last 3 months.", "If the company operates in a cash-intensive trade, also: cash handling policy, signed.", "Board resolution to open the account, signed.", "Company tax registration certificate.", "Company statutes, signed."], "submission": {"case": {"name": "Weskberg BV", "reference": "CW-58097", "details": ["The company operates in a cash-intensive trade."]}, "documents received": ["Shareholder register extract - Weskberg BV.pdf — Shareholder register extract for Weskberg BV, dated 17 August 2026. 2 pages, complete.", "Company statutes - Weskberg BV.pdf — Company statutes for Weskberg BV, dated 4 August 2026. 12 pages, complete. It is signed by the managing director.", "Company tax registration certificate - Weskberg BV.pdf — Company tax registration certificate for Weskberg BV, dated 4 August 2026. 1 page.", "Board resolution to open the account - Weskberg BV.pdf — Board resolution to open the account for Weskberg BV, dated 28 May 2026. 1 page. It is signed by the members of the board.", "Proof of registered office address - Weskberg BV.pdf — Proof of registered office address for Weskberg BV, dated 25 July 2026. 1 page.", "Cash handling policy - Weskberg BV.pdf — Cash handling policy for Weskberg BV, dated 2 July 2026. 2 pages, complete. It carries the signature of the managing director."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "banking", "pack_kind": "business account opening file", "test_type": "partial", "defect": "all pages present", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 786}} {"id": "isc-te-00493-p3-is_complete", "suite": "is_complete", "family": "logistics", "state": {"context": {"organisation": "Delvlund GmbH", "reviewer": "the credit control team", "pack": "customer credit account pack", "purpose": "before a credit account is opened for the customer", "date of the review": "6 August 2026"}, "checklist": ["Check that the signed credit terms agreement is included and signed.", "Check that the personal guarantee is included and signed.", "Check that the company registration certificate is included.", "Check that the bank reference letter is included, was issued within the last 6 months, and is signed.", "Check that the trade references letter is included, was issued within the last 3 months, and is signed.", "Check that the credit reference agency report is included and was issued within the last 3 months."], "submission": {"case": {"name": "Haskhurst Limited", "reference": "ZB-88049"}, "documents received": ["Bank reference letter - Haskhurst Limited.pdf. Dated 3 August 2026, this bank reference letter concerns Haskhurst Limited and is a single page. The signature line is empty, so it is not signed.", "Credit reference agency report - Haskhurst Limited.pdf. Dated 18 July 2026, this credit reference agency report concerns Haskhurst Limited. 6 pages, complete.", "Company registration certificate - Haskhurst Limited.pdf. Dated 20 April 2026, this company registration certificate concerns Haskhurst Limited. 2 pages, complete.", "Trade references letter - Haskhurst Limited.pdf. Dated 22 July 2026, this trade references letter concerns Haskhurst Limited and is signed by the trade referee. 1 page.", "Personal guarantee - Haskhurst Limited.pdf. Dated 27 May 2026, this personal guarantee concerns Haskhurst Limited and is signed by the guarantor. 2 pages, complete.", "Trade account application form - Haskhurst Limited.pdf. Dated 1 July 2026, this trade account application form concerns Haskhurst Limited and is signed by the company's finance director. 3 pages, complete.", "Signed credit terms agreement - Haskhurst Limited.pdf. Dated 7 June 2026, this signed credit terms agreement concerns Haskhurst Limited and is signed by the company's managing director. 4 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "logistics", "pack_kind": "customer credit account pack", "test_type": "partial", "defect": "not signed", "n_lines": 6, "n_conditional": 0, "n_documents": 7, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 864}} {"id": "isc-te-00302-p4-is_complete", "suite": "is_complete", "family": "insurance claims", "state": {"context": {"organisation": "Yondmouth plc", "reviewer": "the engineering claims specialists", "pack": "business equipment breakdown claim file", "purpose": "before machinery repair or replacement costs are paid", "date of the review": "1 April 2026"}, "checklist": ["Check the pack contains the policy machinery schedule.", "Check the pack contains the machine maintenance log, issued within the last 6 months.", "If a temporary machine was hired to keep production going, also: check the pack contains the temporary hire agreement for replacement machinery, issued within the last 3 months and signed.", "Check the pack contains the photographs of the failed component.", "Check the pack contains the purchase invoice for the machine.", "Check the pack contains the repair or replacement quotation, issued within the last 3 months."], "submission": {"case": {"name": "failed machine ZE-69152", "reference": "EP-56568", "details": ["No temporary machine was hired to keep production going."]}, "documents received": ["Policy machinery schedule for machine ZE-69152. Date of issue: 11 March 2026. 3 pages, complete.", "Repair or replacement quotation for machine ZE-69152. Date of issue: 16 January 2026. 2 pages, complete.", "Equipment breakdown claim form for machine ZE-69152. Date of issue: 30 January 2026. 3 pages, complete. Signed by the policyholder's operations director.", "Purchase invoice for the machine for machine ZE-69152. Date of issue: 14 December 2025. Single page.", "Machine maintenance log for machine ZE-69152. Date of issue: 30 March 2026. 5 pages, complete.", "Photographs of the failed component for machine ZE-69152. Date of issue: 24 March 2026. 2 pages, complete.", "Repair or replacement quotation for machine ZE-69152. Date of issue: 26 March 2024. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "insurance claims", "pack_kind": "business equipment breakdown claim file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an older out-of-date copy", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 827}} {"id": "isc-te-00092-p3-is_complete", "suite": "is_complete", "family": "IT operations", "state": {"context": {"organisation": "Aldness Partners", "reviewer": "the identity and access management team", "pack": "access rights leaver pack", "purpose": "to close all IT accounts and access after someone leaves the company", "date of the review": "25 May 2026"}, "checklist": ["Leaver notification form, signed", "If the leaver held privileged administrator accounts, also: privileged account revocation certificate, issued within the last 1 months, signed", "Non-disclosure reminder acknowledgement, signed", "Service desk ticket closure summary, issued within the last 1 months", "Equipment return receipt, issued within the last 1 months, signed", "Final payroll cut-off note, issued within the last 1 months, signed", "Line manager confirmation, issued within the last 1 months, signed"], "submission": {"case": {"name": "Vikram Brodard", "reference": "VR-80988", "details": ["The leaver held no privileged administrator accounts."]}, "cover note": "I am sorry that this pack was put together in a rush.", "documents received": ["Payroll_cut_off_note_Brodard_20260523.pdf. A final payroll cut-off note for Vikram Brodard, dated 23 May 2026. It is a single page and is signed by the payroll officer.", "Scan_20260525_0417.pdf. The scan is blank and nothing of its contents can be seen.", "Service_desk_closure_summary_Brodard_20260517.pdf. A service desk ticket closure summary for Vikram Brodard, dated 17 May 2026. 3 pages, complete.", "NDA_reminder_ack_Brodard_20260319.pdf. A non-disclosure reminder acknowledgement for Vikram Brodard, dated 19 March 2026. It is a single page and is signed by the departing employee.", "Leaver_notification_form_Brodard_20260410.pdf. A leaver notification form for Vikram Brodard, dated 10 April 2026. 2 pages, complete. It is signed by the line manager.", "Equipment_return_receipt_Brodard_20260522.pdf. An equipment return receipt for Vikram Brodard, dated 22 May 2026. It is a single page and is signed by the receiving IT asset officer.", "Line_manager_confirmation_Brodard_20260508.pdf. A line manager confirmation for Vikram Brodard, dated 8 May 2026. It is a single page and is signed by the line manager."]}}, "question": {"type": "choice", "instructions": "The decision required is whether the pack is complete against the checklist. Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "IT operations", "pack_kind": "access rights leaver pack", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time), plus an unreadable extra file", "n_lines": 7, "n_conditional": 1, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "variant-67", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 958}} {"id": "isc-te-00039-p1-is_complete", "suite": "is_complete", "family": "legal contracts", "state": {"context": {"organisation": "Iskton GmbH", "reviewer": "the dispute resolution team", "pack": "termination for breach file", "purpose": "before a termination notice for breach is sent", "date of the review": "29 July 2026"}, "checklist": ["If the contract requires a dispute to go to mediation first, also include: mediation request confirmation (issued within the last 1 months, signed)", "original service agreement copy", "breach evidence log (issued within the last 1 months, signed)", "cure period expiry calculation (issued within the last 1 months, signed)", "litigation hold notice (issued within the last 1 months, signed)", "default notice previously served (issued within the last 6 months, signed)"], "submission": {"case": {"name": "Ovarfeld Ltd", "reference": "BZ-18824", "details": ["The contract requires a dispute to go to mediation first."]}, "documents received": ["Original service agreement copy for Ovarfeld Ltd, dated 31 May 2026. 10 pages, complete.", "Cure period expiry calculation for Ovarfeld Ltd, issued 20 July 2026. 2 pages, complete. Signed by the contracts manager.", "Breach evidence log for Ovarfeld Ltd, issued 20 July 2026. 6 pages, complete. Signed by the dispute resolution team lead.", "Default notice previously served on Ovarfeld Ltd, dated 6 June 2026. Single page. Signed by the contracts manager.", "Litigation hold notice for Ovarfeld Ltd, issued 27 July 2026. 2 pages, complete. Signed by the general counsel.", "Losses calculation statement for Ovarfeld Ltd, issued 25 July 2026. 3 pages, complete. Signed by the finance manager."]}}, "question": {"type": "choice", "instructions": "Is the pack complete when measured against the checklist? Step through each checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents itself.", "criteria": {"incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "incomplete", "target": "incomplete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "legal contracts", "pack_kind": "termination for breach file", "test_type": "conditional", "defect": "circumstance holds, document absent", "n_lines": 6, "n_conditional": 1, "n_documents": 6, "verified": false, "misleading_cue": false, "instructions": "variant-5", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 766}} {"id": "isc-te-00200-p5-is_complete", "suite": "is_complete", "family": "facilities management", "state": {"context": {"organisation": "Nordlock Limited", "reviewer": "the workplace project team", "pack": "office relocation move pack", "purpose": "before the moving contractor is given access to the new floor", "date of the review": "6 March 2026"}, "checklist": ["Furniture inventory list, issued within the last 1 months, signed", "Crate hire agreement, signed", "IT decommissioning certificate, issued within the last 1 months, signed", "Movers insurance certificate, valid (not expired) on the date of the review", "New floor snagging list, issued within the last 1 months, signed", "Signed move plan, signed"], "submission": {"case": {"name": "office move project NC-41124", "reference": "TC-49720"}, "documents received": ["Lifting equipment inspection report for office move project NC-41124. Date of issue: 20 February 2026. 2 pages, complete. Signed by the lifting equipment inspector.", "Signed move plan for office move project NC-41124. Date of issue: 25 November 2025. 6 pages, complete. Signed by the project manager.", "Parking bay suspension approval for office move project NC-41124. Date of issue: 4 March 2026. 1 page. Signed by the highways authority officer.", "Furniture inventory list for office move project NC-41124. Date of issue: 16 February 2026. 4 pages, complete. Signed by the facilities manager.", "Crate hire agreement for office move project NC-41124. Date of issue: 4 February 2026. 2 pages, complete. Signed by the crate hire supplier's representative.", "New floor snagging list for office move project NC-41124. Date of issue: 24 February 2026. 3 pages, complete. Signed by the building surveyor.", "Movers insurance certificate for office move project NC-41124. Expiry date: 14 December 2027. 1 page.", "IT decommissioning certificate for office move project NC-41124. Date of issue: 24 February 2026. 1 page. Signed by the IT services lead."]}}, "question": {"type": "choice", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "facilities management", "pack_kind": "office relocation move pack", "test_type": "missing", "defect": "all present", "n_lines": 6, "n_conditional": 0, "n_documents": 8, "verified": true, "misleading_cue": false, "instructions": "none", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 687}} {"id": "isc-te-00147-p5-is_complete", "suite": "is_complete", "family": "personal and household admin", "state": {"context": {"organisation": "Mersheim Ltd", "reviewer": "the bank's mortgage team", "pack": "mortgage application file", "purpose": "before the mortgage can be approved", "date of the review": "10 April 2026"}, "checklist": ["If the borrower is self-employed, also include: two most recent tax year overviews, issued within the last 18 months, signed.", "If the property being bought is a flat in a shared building, also include: management company pack, issued within the last 3 months.", "Property valuation report, issued within the last 3 months, signed.", "Three months of bank statements, issued within the last 3 months.", "Three most recent payslips, issued within the last 3 months.", "Passport, valid (not expired) on the date of the review.", "Gifted deposit letter, issued within the last 3 months, signed."], "submission": {"case": {"name": "Charlotte Paskthwaite", "reference": "ZE-83977", "details": ["The borrower is self-employed.", "The property being bought is a flat in a shared building."]}, "cover note": "Callum Foskcombe here. Apologies in advance, as this pack was put together in a rush before it went out.", "documents received": ["Three months of bank statements for Charlotte Paskthwaite. Date of issue: 13 February 2026. 9 pages, complete.", "Property valuation report for Charlotte Paskthwaite. Date of issue: 3 March 2026. 8 pages, complete. Signed by the surveyor who carried out the valuation.", "Three most recent payslips for Charlotte Paskthwaite. Date of issue: 13 March 2026. 3 pages, complete.", "Management company pack for Charlotte Paskthwaite. Date of issue: 17 February 2026. 12 pages, complete.", "Two most recent tax year overviews for Charlotte Paskthwaite. Date of issue: 17 July 2025. 4 pages, complete. Signed by HMRC, the issuing tax authority.", "Passport for Charlotte Paskthwaite. Expiry date: 13 April 2028. 2 pages, complete.", "Gifted deposit letter for Charlotte Paskthwaite. Date of issue: 21 January 2026. Single page. Signed by the person gifting the deposit."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "personal and household admin", "pack_kind": "mortgage application file", "test_type": "expired", "defect": "issued near the start of the allowed period (still in time)", "n_lines": 7, "n_conditional": 2, "n_documents": 7, "verified": true, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 2, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 899}} {"id": "isc-te-00322-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Larvmoor Inc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "2 April 2026"}, "checklist": ["Confirm the pack includes the account closure procedure.", "Confirm the pack includes a two-factor authentication confirmation issued within the last 3 months.", "Confirm the pack includes a signed platform terms acceptance record.", "Confirm the pack includes a signed account request form.", "Confirm the pack includes a signed naming convention approval."], "submission": {"case": {"name": "new social media account FX-38776", "reference": "AG-45011"}, "cover note": "All the paperwork for this pack is in order, so a quick approval would be much appreciated.", "documents received": ["naming_convention_approval_FX-38776.pdf. Naming convention approval for new social media account FX-38776. It is dated 1 January 2026, is a single page and is signed by the social media governance lead.", "account_closure_procedure_FX-38776.pdf. Account closure procedure for new social media account FX-38776. It is dated 21 December 2025 and is a single page.", "platform_terms_acceptance_record_FX-38776.pdf. Platform terms acceptance record for new social media account FX-38776. It is dated 17 January 2026, is a single page and is signed by the social media manager.", "account_request_form_FX-38776.pdf. Account request form for new social media account FX-38776. It is dated 21 March 2026, is a single page and is signed by the requesting marketing manager.", "two_factor_authentication_confirmation_FX-38776_v3.pdf. Two-factor authentication confirmation for new social media account FX-38776. The date of issue is smudged and cannot be read, and it is a single page.", "account_purpose_statement_FX-38776.pdf. Account purpose statement for new social media account FX-38776. It is dated 27 January 2026 and is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "unclear", "target": "unclear", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "expired", "defect": "date not visible", "n_lines": 5, "n_conditional": 0, "n_documents": 6, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 869}} {"id": "isc-te-00141-p1-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Aldholm plc", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "7 July 2026"}, "checklist": ["Confirm the pack includes the account closure procedure.", "Confirm the pack includes the account request form, signed.", "Confirm the pack includes the naming convention approval, signed.", "If the account will be run by an external agency, also: confirm the pack includes the agency access agreement, signed.", "Confirm the pack includes the content escalation route, signed.", "Confirm the pack includes the platform terms acceptance record, signed.", "Confirm the pack includes the two-factor authentication confirmation, issued within the last 3 months."], "submission": {"case": {"name": "new social media account SA-68108", "reference": "VD-16282", "details": ["The account will be run entirely by in-house staff."]}, "documents received": ["A single-page naming convention approval for new social media account SA-68108, dated 19 May 2026, signed by the social media governance team lead.", "A single-page two-factor authentication confirmation for new social media account SA-68108, dated 26 May 2026.", "A single-page password policy document for new social media account SA-68108, dated 26 May 2026.", "A single-page account request form for new social media account SA-68108, dated 5 April 2026, signed by the requesting manager.", "A single-page content escalation route for new social media account SA-68108, dated 25 April 2026, signed by the communications manager.", "A single-page platform terms acceptance record for new social media account SA-68108, dated 9 June 2026, signed by the account owner.", "A single-page account purpose statement for new social media account SA-68108, dated 7 May 2026.", "A single-page account closure procedure for new social media account SA-68108, dated 22 March 2026."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "wrong", "defect": "right document plus a similar wrong one", "n_lines": 7, "n_conditional": 1, "n_documents": 8, "verified": false, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 849}} {"id": "isc-te-00234-p2-is_complete", "suite": "is_complete", "family": "marketing", "state": {"context": {"organisation": "Nordridge & Co", "reviewer": "the social media governance team", "pack": "social media account setup file", "purpose": "before the account is created and goes live", "date of the review": "13 April 2026"}, "checklist": ["Confirm the pack includes an account purpose statement.", "Confirm the pack includes a two-factor authentication confirmation issued within the last 3 months.", "Confirm the pack includes an admin access list issued within the last 3 months.", "Confirm the pack includes a naming convention approval that is signed.", "If the account will post content about financial products, also confirm the pack includes a financial promotions approval note issued within the last 3 months and signed.", "Confirm the pack includes an account request form that is signed."], "submission": {"case": {"name": "new social media account WY-2923", "reference": "PH-42275", "details": ["The account will not post any content about financial products."]}, "cover note": "Please accept my apologies for this pack being put together in a rush.", "documents received": ["Scanned two-factor authentication confirmation about new social media account WY-2923, showing its date of issue as 22 March 2026. The scan is a single page.", "Scanned naming convention approval about new social media account WY-2923, showing its date of issue as 5 April 2026, and signed by the social media governance team lead. The scan is a single page.", "Scanned content escalation route about new social media account WY-2923, showing its date of issue as 8 March 2026, and signed by the social media governance team lead. The scan is a single page.", "Scanned account request form about new social media account WY-2923, showing its date of issue as 13 March 2026, and signed by the requesting marketing manager. The scan is a single page.", "Scanned admin access list about new social media account WY-2923, showing its date of issue as 21 February 2026. The scan is a single page.", "File received as scan_20260413_07.pdf. The file will not open, so its contents cannot be seen.", "Scanned account purpose statement about new social media account WY-2923, showing its date of issue as 29 December 2025. The scan is a single page."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated.", "complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned)."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "marketing", "pack_kind": "social media account setup file", "test_type": "conditional", "defect": "circumstance does not hold, document absent, plus an unreadable extra file", "n_lines": 6, "n_conditional": 1, "n_documents": 7, "verified": false, "misleading_cue": true, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 905}} {"id": "isc-te-00433-p1-is_complete", "suite": "is_complete", "family": "research", "state": {"context": {"organisation": "Yselburg Partners", "reviewer": "the procurement committee", "pack": "equipment purchase approval file", "purpose": "before an order for the equipment can be placed", "date of the review": "1 April 2026"}, "checklist": ["Confirm the cost-benefit justification is included.", "Confirm the installation requirements note is included.", "Confirm the vendor quotation is included, issued within the last 3 months.", "Confirm the maintenance plan is included."], "submission": {"case": {"name": "equipment FH-21730", "reference": "QM-98274"}, "documents received": ["cost-benefit justification FH-21730.pdf — A cost-benefit justification for equipment FH-21730, dated 21 December 2025. 3 pages, complete.", "installation requirements note FH-21730.pdf — An installation requirements note for equipment FH-21730, dated 17 February 2026. 2 pages, complete.", "maintenance plan FH-21730.pdf — A maintenance plan for equipment FH-21730, dated 7 March 2026. 2 pages, complete.", "vendor quotation FH-21730.pdf — A vendor quotation for equipment FH-21730, dated 5 February 2026. 2 pages, complete."]}}, "question": {"type": "choice", "instructions": "Is the pack complete against the checklist? Go through every checklist line that applies to this case. A required document counts only if it is the kind of document listed (not a similar one), is about the subject of the case, has all its pages, is signed where the checklist asks for a signature, has not expired on the date of the review, and was issued within the period the checklist allows. A conditional line applies only when its circumstance holds for the case. complete: every applicable line is met (extra documents do not matter). incomplete: at least one applicable line is not met. unclear: no line is clearly unmet, but at least one cannot be decided from what is shown, for example a needed date, signature or page count is not visible, a document's kind cannot be told, or the case details do not say whether a conditional line's circumstance holds while its document is absent. Cover notes and labels may be misleading; judge the documents themselves.", "criteria": {"complete": "Every document the checklist requires for this case is in the pack and acceptable.", "incomplete": "At least one required document is missing or not acceptable (wrong kind, about someone or something else, expired or too old, missing pages, or unsigned).", "unclear": "The pack and the case details do not settle it: something the answer depends on cannot be seen or is not stated."}}, "label": "complete", "target": "complete", "source": {"generator": "is_complete", "version": "1.0", "seed": 20261501, "kind": "is_complete", "split": "test", "domain": "research", "pack_kind": "equipment purchase approval file", "test_type": "partial", "defect": "all pages present", "n_lines": 4, "n_conditional": 0, "n_documents": 4, "verified": true, "misleading_cue": false, "instructions": "canonical", "text_model": "GLM-5.3-NVFP4", "text_attempts": 1, "labels_from": "code (packs.py: the label is evaluated from the structured checklist, case and documents)", "blind_check": "agreed", "check_model": "GLM-5.3-NVFP4", "input_tokens": 666}}