[ { "qid": "TND-S-roads -40-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (roads highways / expressways) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-roads -40-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (roads highways / expressways) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-roads -80-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (roads highways / expressways) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-roads -80-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (roads highways / expressways) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-roads -150-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (roads highways / expressways) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-roads -150-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (roads highways / expressways) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-roads -250-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (roads highways / expressways) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-roads -250-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (roads highways / expressways) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-roads -400-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (roads highways / expressways) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-roads -400-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (roads highways / expressways) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-bridge-40-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (bridges flyovers / large bridges) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-bridge-40-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (bridges flyovers / large bridges) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-bridge-80-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (bridges flyovers / large bridges) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-bridge-80-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (bridges flyovers / large bridges) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-bridge-150-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (bridges flyovers / large bridges) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-bridge-150-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (bridges flyovers / large bridges) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-bridge-250-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (bridges flyovers / large bridges) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-bridge-250-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (bridges flyovers / large bridges) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-bridge-400-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (bridges flyovers / large bridges) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-bridge-400-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (bridges flyovers / large bridges) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-water -40-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (water treatment / water supply) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-water -40-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (water treatment / water supply) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-water -80-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (water treatment / water supply) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-water -80-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (water treatment / water supply) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-water -150-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (water treatment / water supply) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-water -150-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (water treatment / water supply) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-water -250-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (water treatment / water supply) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-water -250-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (water treatment / water supply) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-water -400-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (water treatment / water supply) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-water -400-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (water treatment / water supply) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-sewera-40-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (sewerage drainage) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-sewera-40-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (sewerage drainage) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-sewera-80-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (sewerage drainage) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-sewera-80-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (sewerage drainage) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-sewera-150-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (sewerage drainage) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-sewera-150-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (sewerage drainage) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-sewera-250-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (sewerage drainage) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-sewera-250-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (sewerage drainage) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-sewera-400-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (sewerage drainage) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-sewera-400-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (sewerage drainage) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-buildi-40-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (buildings / small buildings) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-buildi-40-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (buildings / small buildings) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-buildi-80-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (buildings / small buildings) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-buildi-80-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (buildings / small buildings) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-buildi-150-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (buildings / small buildings) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-buildi-150-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (buildings / small buildings) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-buildi-250-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (buildings / small buildings) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-buildi-250-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (buildings / small buildings) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-buildi-400-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (buildings / small buildings) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-buildi-400-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (buildings / small buildings) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-irriga-40-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (irrigation) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-irriga-40-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (irrigation) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-irriga-80-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (irrigation) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-irriga-80-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (irrigation) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-irriga-150-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (irrigation) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-irriga-150-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (irrigation) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-irriga-250-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (irrigation) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-irriga-250-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (irrigation) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-irriga-400-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (irrigation) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-irriga-400-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (irrigation) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-tunnel-40-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (tunnels) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-tunnel-40-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (tunnels) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-tunnel-80-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (tunnels) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-tunnel-80-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (tunnels) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-tunnel-150-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (tunnels) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-tunnel-150-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (tunnels) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-tunnel-250-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (tunnels) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-tunnel-250-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (tunnels) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-tunnel-400-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (tunnels) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-tunnel-400-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (tunnels) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-indust-40-5", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (industrial epc) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-indust-40-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (industrial epc) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 40 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-indust-80-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (industrial epc) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-indust-80-7", "answer_type": "verdict", "gold": "QUALIFIES", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (industrial epc) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 80 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-indust-150-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (industrial epc) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-indust-150-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (industrial epc) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 150 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-indust-250-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (industrial epc) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-indust-250-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (industrial epc) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 250 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-indust-400-5", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-06-30): 'Similar works (industrial epc) completed in the last 5 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-S-indust-400-7", "answer_type": "verdict", "gold": "DOES NOT QUALIFY", "hops": 4, "family": "tender_similar", "question": "Tender clause (bid due 2026-09-30): 'Similar works (industrial epc) completed in the last 7 years: one work of at least 80% of the estimated cost of INR 400 Cr, or two works of 60%, or three works of 40%.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-avg-75", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "QUALIFIES", "question": "Tender clause (bid due 2026-06-30): 'Average annual turnover of the last 3 financial years not less than INR 75 Cr.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-each-75", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "QUALIFIES", "question": "Tender clause (bid due 2026-06-30): 'Annual turnover >= INR 75 Cr in each of the last 3 financial years.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-avg-150", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "QUALIFIES", "question": "Tender clause (bid due 2026-06-30): 'Average annual turnover of the last 3 financial years not less than INR 150 Cr.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-each-150", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "QUALIFIES", "question": "Tender clause (bid due 2026-06-30): 'Annual turnover >= INR 150 Cr in each of the last 3 financial years.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-avg-200", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "QUALIFIES", "question": "Tender clause (bid due 2026-06-30): 'Average annual turnover of the last 3 financial years not less than INR 200 Cr.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-each-200", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "QUALIFIES", "question": "Tender clause (bid due 2026-06-30): 'Annual turnover >= INR 200 Cr in each of the last 3 financial years.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-avg-230", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "QUALIFIES", "question": "Tender clause (bid due 2026-06-30): 'Average annual turnover of the last 3 financial years not less than INR 230 Cr.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-each-230", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "QUALIFIES", "question": "Tender clause (bid due 2026-06-30): 'Annual turnover >= INR 230 Cr in each of the last 3 financial years.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-avg-240", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "QUALIFIES", "question": "Tender clause (bid due 2026-06-30): 'Average annual turnover of the last 3 financial years not less than INR 240 Cr.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-each-240", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "DOES NOT QUALIFY", "question": "Tender clause (bid due 2026-06-30): 'Annual turnover >= INR 240 Cr in each of the last 3 financial years.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-avg-250", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "QUALIFIES", "question": "Tender clause (bid due 2026-06-30): 'Average annual turnover of the last 3 financial years not less than INR 250 Cr.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-each-250", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "DOES NOT QUALIFY", "question": "Tender clause (bid due 2026-06-30): 'Annual turnover >= INR 250 Cr in each of the last 3 financial years.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-avg-260", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "DOES NOT QUALIFY", "question": "Tender clause (bid due 2026-06-30): 'Average annual turnover of the last 3 financial years not less than INR 260 Cr.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-each-260", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "DOES NOT QUALIFY", "question": "Tender clause (bid due 2026-06-30): 'Annual turnover >= INR 260 Cr in each of the last 3 financial years.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-avg-300", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "DOES NOT QUALIFY", "question": "Tender clause (bid due 2026-06-30): 'Average annual turnover of the last 3 financial years not less than INR 300 Cr.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-T-each-300", "answer_type": "verdict", "hops": 2, "family": "tender_turnover", "gold": "DOES NOT QUALIFY", "question": "Tender clause (bid due 2026-06-30): 'Annual turnover >= INR 300 Cr in each of the last 3 financial years.' Do we qualify? Answer QUALIFIES or DOES NOT QUALIFY." }, { "qid": "TND-P-roads -10-2026-06-30", "answer_type": "count", "gold": 9, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one roads highways project?" }, { "qid": "TND-P-roads -10-2027-09-30", "answer_type": "count", "gold": 2, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one roads highways project?" }, { "qid": "TND-P-roads -15-2026-06-30", "answer_type": "count", "gold": 6, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one roads highways project?" }, { "qid": "TND-P-roads -15-2027-09-30", "answer_type": "count", "gold": 1, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one roads highways project?" }, { "qid": "TND-P-roads -20-2026-06-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one roads highways project?" }, { "qid": "TND-P-roads -20-2027-09-30", "answer_type": "count", "gold": 1, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one roads highways project?" }, { "qid": "TND-P-roads -25-2026-06-30", "answer_type": "count", "gold": 3, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one roads highways project?" }, { "qid": "TND-P-roads -25-2027-09-30", "answer_type": "count", "gold": 1, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one roads highways project?" }, { "qid": "TND-P-bridge-10-2026-06-30", "answer_type": "count", "gold": 12, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one bridges flyovers project?" }, { "qid": "TND-P-bridge-10-2027-09-30", "answer_type": "count", "gold": 6, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one bridges flyovers project?" }, { "qid": "TND-P-bridge-15-2026-06-30", "answer_type": "count", "gold": 8, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one bridges flyovers project?" }, { "qid": "TND-P-bridge-15-2027-09-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one bridges flyovers project?" }, { "qid": "TND-P-bridge-20-2026-06-30", "answer_type": "count", "gold": 8, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one bridges flyovers project?" }, { "qid": "TND-P-bridge-20-2027-09-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one bridges flyovers project?" }, { "qid": "TND-P-bridge-25-2026-06-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one bridges flyovers project?" }, { "qid": "TND-P-bridge-25-2027-09-30", "answer_type": "count", "gold": 4, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one bridges flyovers project?" }, { "qid": "TND-P-water -10-2026-06-30", "answer_type": "count", "gold": 8, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one water treatment project?" }, { "qid": "TND-P-water -10-2027-09-30", "answer_type": "count", "gold": 2, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one water treatment project?" }, { "qid": "TND-P-water -15-2026-06-30", "answer_type": "count", "gold": 6, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one water treatment project?" }, { "qid": "TND-P-water -15-2027-09-30", "answer_type": "count", "gold": 2, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one water treatment project?" }, { "qid": "TND-P-water -20-2026-06-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one water treatment project?" }, { "qid": "TND-P-water -20-2027-09-30", "answer_type": "count", "gold": 2, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one water treatment project?" }, { "qid": "TND-P-water -25-2026-06-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one water treatment project?" }, { "qid": "TND-P-water -25-2027-09-30", "answer_type": "count", "gold": 2, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one water treatment project?" }, { "qid": "TND-P-sewera-10-2026-06-30", "answer_type": "count", "gold": 8, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one sewerage drainage project?" }, { "qid": "TND-P-sewera-10-2027-09-30", "answer_type": "count", "gold": 2, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one sewerage drainage project?" }, { "qid": "TND-P-sewera-15-2026-06-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one sewerage drainage project?" }, { "qid": "TND-P-sewera-15-2027-09-30", "answer_type": "count", "gold": 2, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one sewerage drainage project?" }, { "qid": "TND-P-sewera-20-2026-06-30", "answer_type": "count", "gold": 3, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one sewerage drainage project?" }, { "qid": "TND-P-sewera-20-2027-09-30", "answer_type": "count", "gold": 1, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one sewerage drainage project?" }, { "qid": "TND-P-sewera-25-2026-06-30", "answer_type": "count", "gold": 3, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one sewerage drainage project?" }, { "qid": "TND-P-sewera-25-2027-09-30", "answer_type": "count", "gold": 1, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one sewerage drainage project?" }, { "qid": "TND-P-buildi-10-2026-06-30", "answer_type": "count", "gold": 8, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one buildings project?" }, { "qid": "TND-P-buildi-10-2027-09-30", "answer_type": "count", "gold": 6, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one buildings project?" }, { "qid": "TND-P-buildi-15-2026-06-30", "answer_type": "count", "gold": 7, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one buildings project?" }, { "qid": "TND-P-buildi-15-2027-09-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one buildings project?" }, { "qid": "TND-P-buildi-20-2026-06-30", "answer_type": "count", "gold": 7, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one buildings project?" }, { "qid": "TND-P-buildi-20-2027-09-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one buildings project?" }, { "qid": "TND-P-buildi-25-2026-06-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one buildings project?" }, { "qid": "TND-P-buildi-25-2027-09-30", "answer_type": "count", "gold": 4, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one buildings project?" }, { "qid": "TND-P-irriga-10-2026-06-30", "answer_type": "count", "gold": 12, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one irrigation project?" }, { "qid": "TND-P-irriga-10-2027-09-30", "answer_type": "count", "gold": 4, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 10 years' experience, and having led at least one irrigation project?" }, { "qid": "TND-P-irriga-15-2026-06-30", "answer_type": "count", "gold": 8, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one irrigation project?" }, { "qid": "TND-P-irriga-15-2027-09-30", "answer_type": "count", "gold": 3, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 15 years' experience, and having led at least one irrigation project?" }, { "qid": "TND-P-irriga-20-2026-06-30", "answer_type": "count", "gold": 5, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one irrigation project?" }, { "qid": "TND-P-irriga-20-2027-09-30", "answer_type": "count", "gold": 3, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 20 years' experience, and having led at least one irrigation project?" }, { "qid": "TND-P-irriga-25-2026-06-30", "answer_type": "count", "gold": 2, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2026-06-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one irrigation project?" }, { "qid": "TND-P-irriga-25-2027-09-30", "answer_type": "count", "gold": 1, "hops": 4, "family": "tender_personnel", "question": "How many of our people could be proposed as Project Manager for a bid due 2027-09-30 that requires a PMP valid on that date, at least 25 years' experience, and having led at least one irrigation project?" } ]