[{"source":"esios","id":"686","name":"Upward imbalances Collection price","name_es":"Precio de cobro desv\u00edos a subir","description":"The measured imbalances are the difference between the scheduled energy and the measured energy. The imbalances price is calculated in accordance to the O.P. 14.4. Publication: hourly with the information available so far of day D, having a provisional price. The following day is updated the\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":true,"group":"balancing","column":"imbalance_price_up","availability":"past"},{"source":"esios","id":"687","name":"Downward imbalances Payment price","name_es":"Precio de pago desv\u00edos a bajar","description":"The measured imbalances are the difference between the scheduled energy and the measured energy. The imbalances price is calculated in accordance to the O.P. 14.4. Publication: hourly with the information available so far of day D, having a provisional price. The following day is updated the\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":true,"group":"balancing","column":"imbalance_price_down","availability":"past"},{"source":"esios","id":"1338","name":"Generation-demand imbalances volume","name_es":"Volumen neto de los desv\u00edos generaci\u00f3n-demanda","description":"Balance of the energies coming from the Replacement Reserves (RR), tertiary regulation and secondary regulation. Publication: Every fifteen minutes with the information available up to that point on day D, and from 7:30 p.m. onwards for past days according to the settlement calendar.","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":true,"group":"balancing","column":"imbalance_net_volume","availability":"past"},{"source":"esios","id":"10252","name":"aFRR Net volume of activated energy","name_es":"Volumen neto de energ\u00eda utilizada de regulaci\u00f3n secundaria","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":true,"group":"balancing","column":"afrr_net_volume","availability":"past"},{"source":"esios","id":"10389","name":"aFRR Energy weighted average price upward","name_es":"Precio medio ponderado de energ\u00eda de regulaci\u00f3n secundaria a subir","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":true,"group":"balancing","column":"afrr_price_up","availability":"past"},{"source":"esios","id":"10390","name":"aFRR Energy weighted average price downward","name_es":"Precio medio ponderado de energ\u00eda de regulaci\u00f3n secundaria a bajar","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":true,"group":"balancing","column":"afrr_price_down","availability":"past"},{"source":"esios","id":"2184","name":"Inelastic need for mFRR balancing energy to increase scheduled activation","name_es":"Necesidad inel\u00e1stica solicitada de energ\u00edas de balance mFRR a subir de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"mfrr","column":"mfrr_inelastic_requested_up","availability":"past"},{"source":"esios","id":"2185","name":"Inelastic need for mFRR balancing energy to decrease scheduled activation","name_es":"Necesidad inel\u00e1stica solicitada de energ\u00edas de balance mFRR a bajar de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"mfrr","column":"mfrr_inelastic_requested_down","availability":"past"},{"source":"esios","id":"2188","name":"Need for mFRR balancing energy to increase direct activation","name_es":"Necesidad solicitada de energ\u00edas de balance mFRR a subir de activaci\u00f3n directa","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"mfrr","column":"mfrr_direct_requested_up","availability":"past"},{"source":"esios","id":"2189","name":"Need for mFRR balancing energy to decrease direct activation","name_es":"Necesidad solicitada de energ\u00edas de balance mFRR a bajar de activaci\u00f3n directa","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"mfrr","column":"mfrr_direct_requested_down","availability":"past"},{"source":"esios","id":"2192","name":"Inelastic need covered for mFRR balancing energy to increase scheduled activation","name_es":"Necesidad inel\u00e1stica cubierta de energ\u00edas de balance mFRR a subir de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"mfrr","column":"mfrr_inelastic_covered_up","availability":"past"},{"source":"esios","id":"2193","name":"Inelastic need covered for mFRR balancing energy to decrease scheduled activation","name_es":"Necesidad inel\u00e1stica cubierta de energ\u00edas de balance mFRR a bajar de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"mfrr","column":"mfrr_inelastic_covered_down","availability":"past"},{"source":"esios","id":"2197","name":"Price of mFRR balancing energy for scheduled activation","name_es":"Precio energ\u00edas de balance mFRR de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"target","column":"mfrr_price","availability":"past"},{"source":"esios","id":"10055","name":"Absolute mFRR volume allocation","name_es":"Volumen absoluto de asignaci\u00f3n de energ\u00edas mFRR","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"mfrr","column":"mfrr_abs_volume","availability":"past"},{"source":"esios","id":"10250","name":"Net mFRR volume allocation","name_es":"Volumen neto de asignaci\u00f3n de energ\u00edas mFRR","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"target","column":"mfrr_energy","availability":"past"},{"source":"esios","id":"10394","name":"Downward mFRR energy allocation","name_es":"Asignaci\u00f3n a bajar de energ\u00edas mFRR SEE","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"mfrr","column":"mfrr_down","availability":"past"},{"source":"esios","id":"10395","name":"Upward mFRR energy allocation","name_es":"Asignaci\u00f3n a subir de energ\u00edas mFRR SEE","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":true,"group":"mfrr","column":"mfrr_up","availability":"past"},{"source":"calendar","id":"dst_switch_day","name":"dst_switch_day","name_es":null,"description":"Flag for the local days with 92 or 100 quarter-hours (DST switch).","category":"Calendar","subcategory":"Calendar","area":"Peninsula","used":true,"group":"calendar","column":"dst_switch_day","availability":"future"},{"source":"calendar","id":"holiday_es","name":"holiday_es","name_es":null,"description":"Spanish national holiday flag (fixed dates plus Good Friday).","category":"Calendar","subcategory":"Calendar","area":"Peninsula","used":true,"group":"calendar","column":"holiday_es","availability":"future"},{"source":"calendar","id":"qh_of_day","name":"qh_of_day","name_es":null,"description":"Quarter-hour of the local (Madrid) day, 0-99.","category":"Calendar","subcategory":"Calendar","area":"Peninsula","used":true,"group":"calendar","column":"qh_of_day","availability":"future"},{"source":"calendar","id":"weekday","name":"weekday","name_es":null,"description":"Local day of week, 0 = Monday.","category":"Calendar","subcategory":"Calendar","area":"Peninsula","used":true,"group":"calendar","column":"weekday","availability":"future"},{"source":"esios","id":"1844","name":"NTC daily forecast France import","name_es":"Capacidad de intercambio prevista (NTC) con Francia horizonte diario importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":true,"group":"xborder","column":"ntc_fr_import","availability":"future"},{"source":"esios","id":"1845","name":"NTC daily forecast Portugal import","name_es":"Capacidad de intercambio prevista (NTC) con Portugal horizonte diario importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":true,"group":"xborder","column":"ntc_pt_import","availability":"future"},{"source":"esios","id":"1848","name":"NTC daily forecast France export","name_es":"Capacidad de intercambio prevista (NTC) con Francia horizonte diario exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":true,"group":"xborder","column":"ntc_fr_export","availability":"future"},{"source":"esios","id":"1849","name":"NTC daily forecast Portugal export","name_es":"Capacidad de intercambio prevista (NTC) con Portugal horizonte diario exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":true,"group":"xborder","column":"ntc_pt_export","availability":"future"},{"source":"esios","id":"1775","name":"Demand D+1 daily forecast","name_es":"Previsi\u00f3n diaria D+1 demanda","description":"CNMC\u2019s Circular 4/2019 establishing the methodology for System Operator retribution, sets up incentives for peninsular demand forecasts quality, performed by System Operator, and establishes the forecast publication in three time horizons: annual, daily and intradaily. This indicator corresponds\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":true,"group":"ree_forecasts","column":"demand_forecast","availability":"future"},{"source":"esios","id":"1777","name":"Wind D+1 daily forecast","name_es":"Previsi\u00f3n diaria D+1 e\u00f3lica","description":"This indicator corresponds to the peninsular daily wind generation forecast done by System Operator for the following day, with hourly breakdown, and published before 11:00, one hour before closing daily market bidding time (12:00 at present). Publication: daily at 11:00 for D+1.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":true,"group":"ree_forecasts","column":"wind_forecast","availability":"future"},{"source":"esios","id":"1779","name":"Photovoltaic D+1 daily forecast","name_es":"Previsi\u00f3n diaria D+1 fotovoltaica","description":"This indicator corresponds to the peninsular daily photovoltaic generation forecast done by System Operator for the following day, with hourly breakdown, and published before 11:00, one hour before closing daily market bidding time (12:00 at present). Publication: daily at 11:00 for D+1.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":true,"group":"ree_forecasts","column":"solar_pv_forecast","availability":"future"},{"source":"esios","id":"10249","name":"Residual demand forecast","name_es":"Previsi\u00f3n de la demanda residual","description":"Forecast resulting from the difference between the daily demand forecast and the solar and wind forecasts. The breakdown of this indicator details the wind generation, solar and daily generation of the Spanish electrical system forecast. Publication: daily when it is published the demand forecast\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":true,"group":"ree_forecasts","column":"residual_demand_forecast","availability":"future"},{"source":"esios","id":"600","name":"Marginal price Day Ahead market","name_es":"Precio mercado SPOT Diario","description":"The Day-Ahead Market is a wholesale market in which electric power transactions are established for the next day, through the presentation of electricity power sale and purchase bids by the market participants. As a result of this, the market price in each bidding zone, the buying and selling\u2026","category":"Prices & markets","subcategory":"Day-ahead","area":"Peninsula","used":true,"group":"da_market","column":"da_price_es, da_price_pt, da_price_fr, da_price_de, da_price_be, da_price_nl","availability":"future"},{"source":"esios","id":"10014","name":"Operating Hourly Program P48 Portugal balance","name_es":"Generaci\u00f3n programada P48 Saldo Portugal","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the balance resulting from the interconnection with Portugal. Its breakdown shows the export and import scheduled energy for\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":true,"group":"xborder","column":"p48_net_pt","availability":"past"},{"source":"esios","id":"10015","name":"Operating Hourly Program P48 France balance","name_es":"Generaci\u00f3n programada P48 Saldo Francia","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the resulting balance in the interconnection with France. Its breakdown shows the export and import scheduled energy for this\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":true,"group":"xborder","column":"p48_net_fr","availability":"past"},{"source":"esios","id":"10104","name":"Base Daily Operating Schedule PBF France balance","name_es":"Generaci\u00f3n programada PBF Saldo Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":true,"group":"xborder","column":"pbf_net_fr","availability":"future"},{"source":"esios","id":"10113","name":"Base Daily Operating Schedule PBF Portugal balance","name_es":"Generaci\u00f3n programada PBF Saldo Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":true,"group":"xborder","column":"pbf_net_pt","availability":"future"},{"source":"esios","id":"10186","name":"Base Daily Operating Shedule PBF total balance interconnections","name_es":"Saldo total interconexiones programa PBF","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the total imbalance Schedule PBF. To see the composition of this indicator\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":true,"group":"xborder","column":"pbf_net_total","availability":"future"},{"source":"esios_offer","id":"601","name":"Curvas de ofertas Banda de regulaci\u00f3n secundaria bajar","name_es":"Curvas de ofertas Banda de regulaci\u00f3n secundaria bajar","description":"La regulaci\u00f3n secundaria es un servicio complementario de car\u00e1cter potestativo que tiene por objeto el mantenimiento del equilibrio generaci\u00f3n-demanda, corrigiendo los desv\u00edos respecto a los programas de intercambio previstos en la interconexi\u00f3n Espa\u00f1a-Francia, y las desviaciones de la frecuencia.\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"629","name":"Curvas de ofertas Reserva de potencia adicional a subir","name_es":"Curvas de ofertas Reserva de potencia adicional a subir","description":"La contrataci\u00f3n y gesti\u00f3n de reserva de potencia adicional a subir es un servicio complementario de oferta obligatoria, gestionado y retribuido por mecanismos de mercado. Tiene por objeto contratar la reserva de potencia adicional a subir, que pueda ser necesaria con respecto a la disponible en el\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"635","name":"Curvas de ofertas Banda de regulaci\u00f3n secundaria subir","name_es":"Curvas de ofertas Banda de regulaci\u00f3n secundaria subir","description":"La regulaci\u00f3n secundaria es un servicio complementario de car\u00e1cter potestativo que tiene por objeto el mantenimiento del equilibrio generaci\u00f3n-demanda, corrigiendo los desv\u00edos respecto a los programas de intercambio previstos en la interconexi\u00f3n Espa\u00f1a-Francia, y las desviaciones de la frecuencia.\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"670","name":"Curvas de ofertas: energ\u00edas de balance RR subir","name_es":"Curvas de ofertas: energ\u00edas de balance RR subir","description":"El mecanismo de gesti\u00f3n de desv\u00edos es un servicio de car\u00e1cter potestativo que tiene por objeto resolver los desv\u00edos entre generaci\u00f3n y consumo que pudieran aparecer con posterioridad al cierre de cada sesi\u00f3n del mercado intradiario y hasta el inicio del horizonte de efectividad de la siguiente\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"671","name":"Curvas de ofertas: energ\u00edas de balance RR bajar","name_es":"Curvas de ofertas: energ\u00edas de balance RR bajar","description":"El mecanismo de gesti\u00f3n de desv\u00edos es un servicio de car\u00e1cter potestativo que tiene por objeto resolver los desv\u00edos entre generaci\u00f3n y consumo que pudieran aparecer con posterioridad al cierre de cada sesi\u00f3n del mercado intradiario y hasta el inicio del horizonte de efectividad de la siguiente\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"678","name":"Curvas de ofertas Regulaci\u00f3n Terciaria bajar","name_es":"Curvas de ofertas Regulaci\u00f3n Terciaria bajar","description":"La regulaci\u00f3n terciaria es un servicio complementario de oferta obligatoria, gestionado y retribuido por mecanismos de mercado. Tiene por objeto la restituci\u00f3n de la reserva de regulaci\u00f3n secundaria que haya sido utilizada. La asignaci\u00f3n del servicio de regulaci\u00f3n terciaria se realiza teniendo en\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"679","name":"Curvas de ofertas Regulaci\u00f3n Terciaria subir","name_es":"Curvas de ofertas Regulaci\u00f3n Terciaria subir","description":"La regulaci\u00f3n terciaria es un servicio complementario de oferta obligatoria, gestionado y retribuido por mecanismos de mercado. Tiene por objeto la restituci\u00f3n de la reserva de regulaci\u00f3n secundaria que haya sido utilizada. La asignaci\u00f3n del servicio de regulaci\u00f3n terciaria se realiza teniendo en\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1089","name":"Curvas de ofertas subasta expl\u00edcita diaria FR-ES importaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita diaria FR-ES importaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad diarias FR-ES fueron sustituidas por el acoplamiento de mercados diarios MRC. La \u00faltima subasta diaria FR-ES se realiz\u00f3 el 13/05/2014. En concreto este indicador desglosa las ofertas de compra de derechos de capacidad de la subasta expl\u00edcita diaria en el\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1090","name":"Curvas de ofertas subasta expl\u00edcita diaria FR-ES exportaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita diaria FR-ES exportaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad diarias FR-ES fueron sustituidas por el acoplamiento de mercados diarios MRC. La \u00faltima subasta diaria FR-ES se realiz\u00f3 el 13/05/2014. En concreto este indicador desglosa las ofertas de compra de derechos de capacidad de la subasta expl\u00edcita diaria en el\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1091","name":"Curvas de ofertas subasta expl\u00edcita intradiaria 1 FR-ES importaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita intradiaria 1 FR-ES importaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad intradiarias fueron eliminadas tras la implantaci\u00f3n del mercado intradiario continuo europeo (SIDC, Single Intraday Coupling). La \u00faltima subasta intradiaria se realiz\u00f3 el 12/06/2018. En concreto este indicador desglosa las ofertas de compra de derechos de\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1092","name":"Curvas de ofertas subasta expl\u00edcita intradiaria 1 FR-ES exportaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita intradiaria 1 FR-ES exportaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad intradiarias fueron eliminadas tras la implantaci\u00f3n del mercado intradiario continuo europeo (SIDC, Single Intraday Coupling). La \u00faltima subasta intradiaria se realiz\u00f3 el 12/06/2018. En concreto este indicador desglosa las ofertas de compra de derechos de\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1093","name":"Curvas de ofertas subasta expl\u00edcita intradiaria 2 FR-ES importaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita intradiaria 2 FR-ES importaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad intradiarias fueron eliminadas tras la implantaci\u00f3n del mercado intradiario continuo europeo (SIDC, Single Intraday Coupling). La \u00faltima subasta intradiaria se realiz\u00f3 el 12/06/2018. En concreto este indicador desglosa las ofertas de compra de derechos de\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1094","name":"Curvas de ofertas subasta expl\u00edcita intradiaria 2 FR-ES exportaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita intradiaria 2 FR-ES exportaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad intradiarias fueron eliminadas tras la implantaci\u00f3n del mercado intradiario continuo europeo (SIDC, Single Intraday Coupling). La \u00faltima subasta intradiaria se realiz\u00f3 el 12/06/2018. En concreto este indicador desglosa las ofertas de compra de derechos de\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1095","name":"Curvas de ofertas subasta expl\u00edcita mensual FR-ES importaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita mensual FR-ES importaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad son un mecanismo de mercado para gestionar la congesti\u00f3n de la interconexi\u00f3n entre Francia y Espa\u00f1a. La capacidad de intercambio comercial se subasta en forma de Derechos F\u00edsicos de Capacidad (PTRs, por sus siglas en ingl\u00e9s) para cada horizonte de negociaci\u00f3n.\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1096","name":"Curvas de ofertas subasta expl\u00edcita mensual FR-ES exportaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita mensual FR-ES exportaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad son un mecanismo de mercado para gestionar la congesti\u00f3n de la interconexi\u00f3n entre Francia y Espa\u00f1a. La capacidad de intercambio comercial se subasta en forma de Derechos F\u00edsicos de Capacidad (PTRs, por sus siglas en ingl\u00e9s) para cada horizonte de negociaci\u00f3n.\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1097","name":"Curvas de ofertas subasta expl\u00edcita anual FR-ES importaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita anual FR-ES importaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad son un mecanismo de mercado para gestionar la congesti\u00f3n de la interconexi\u00f3n entre Francia y Espa\u00f1a. La capacidad de intercambio comercial se subasta en forma de Derechos F\u00edsicos de Capacidad (PTRs, por sus siglas en ingl\u00e9s) para cada horizonte de negociaci\u00f3n.\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1098","name":"Curvas de ofertas subasta expl\u00edcita anual FR-ES exportaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita anual FR-ES exportaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad son un mecanismo de mercado para gestionar la congesti\u00f3n de la interconexi\u00f3n entre Francia y Espa\u00f1a. La capacidad de intercambio comercial se subasta en forma de Derechos F\u00edsicos de Capacidad (PTRs, por sus siglas en ingl\u00e9s) para cada horizonte de negociaci\u00f3n.\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1148","name":"Curva de ofertas de balance presentadas por el SEE para importaci\u00f3n","name_es":"Curva de ofertas de balance presentadas por el SEE para importaci\u00f3n","description":"Los mercados de balance transfronterizos son un mecanismo gestionado desde la plataforma BALIT para la mejora del uso de la capacidad de intercambio en las interconexiones FR-ES y PT-ES, as\u00ed como la optimizaci\u00f3n de costes de asociados a la regulaci\u00f3n de terciaria y la gesti\u00f3n de desv\u00edos. En\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1149","name":"Curva de ofertas de balance presentadas por el SEE para exportaci\u00f3n","name_es":"Curva de ofertas de balance presentadas por el SEE para exportaci\u00f3n","description":"Los mercados de balance transfronterizos son un mecanismo gestionado desde la plataforma BALIT para la mejora del uso de la capacidad de intercambio en las interconexiones FR-ES y PT-ES, as\u00ed como la optimizaci\u00f3n de costes de asociados a la regulaci\u00f3n de terciaria y la gesti\u00f3n de desv\u00edos. En\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1668","name":"Curvas de ofertas subasta expl\u00edcita mensual PT-ES importaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita mensual PT-ES importaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad son un mecanismo de mercado para gestionar la congesti\u00f3n de la interconexi\u00f3n entre Portugal y Espa\u00f1a. La capacidad de intercambio comercial se subasta en forma de Derechos Financieros de Capacidad (FTRs, por sus siglas en ingl\u00e9s) para cada horizonte de\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1669","name":"Curvas de ofertas subasta expl\u00edcita mensual PT-ES exportaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita mensual PT-ES exportaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad son un mecanismo de mercado para gestionar la congesti\u00f3n de la interconexi\u00f3n entre Portugal y Espa\u00f1a. La capacidad de intercambio comercial se subasta en forma de Derechos Financieros de Capacidad (FTRs, por sus siglas en ingl\u00e9s) para cada horizonte de\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1670","name":"Curvas de ofertas subasta expl\u00edcita trimestral PT-ES importaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita trimestral PT-ES importaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad son un mecanismo de mercado para gestionar la congesti\u00f3n de la interconexi\u00f3n entre Portugal y Espa\u00f1a. La capacidad de intercambio comercial se subasta en forma de Derechos Financieros de Capacidad (FTRs, por sus siglas en ingl\u00e9s) para cada horizonte de\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1671","name":"Curvas de ofertas subasta expl\u00edcita trimestral PT-ES exportaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita trimestral PT-ES exportaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad son un mecanismo de mercado para gestionar la congesti\u00f3n de la interconexi\u00f3n entre Portugal y Espa\u00f1a. La capacidad de intercambio comercial se subasta en forma de Derechos Financieros de Capacidad (FTRs, por sus siglas en ingl\u00e9s) para cada horizonte de\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1672","name":"Curvas de ofertas subasta expl\u00edcita anual PT-ES importaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita anual PT-ES importaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad son un mecanismo de mercado para gestionar la congesti\u00f3n de la interconexi\u00f3n entre Portugal y Espa\u00f1a. La capacidad de intercambio comercial se subasta en forma de Derechos Financieros de Capacidad (FTRs, por sus siglas en ingl\u00e9s) para cada horizonte de\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_offer","id":"1673","name":"Curvas de ofertas subasta expl\u00edcita anual PT-ES exportaci\u00f3n","name_es":"Curvas de ofertas subasta expl\u00edcita anual PT-ES exportaci\u00f3n","description":"Las subastas expl\u00edcitas de capacidad son un mecanismo de mercado para gestionar la congesti\u00f3n de la interconexi\u00f3n entre Portugal y Espa\u00f1a. La capacidad de intercambio comercial se subasta en forma de Derechos Financieros de Capacidad (FTRs, por sus siglas en ingl\u00e9s) para cada horizonte de\u2026","category":"Balancing services","subcategory":"Bid curves","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"664","name":"Upward Imbalance Management requirements","name_es":"Requerimientos Gesti\u00f3n de Desv\u00edos subir","description":"The mechanism of deviation management is a service of a facultative nature which aims to resolve the deviation between generation and consumption which may appear after the closure of each intraday market session and until the start of the effectiveness horizon of the following session. The\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"665","name":"Downward Imbalance Management requirements","name_es":"Requerimientos Gesti\u00f3n de Desv\u00edos bajar","description":"The mechanism of deviation management is a service of a facultative nature which aims to resolve the deviation between generation and consumption which may appear after the closure of each intraday market session and until the start of the effectiveness horizon of the following session. The\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"668","name":"Upward Imbalance Management price","name_es":"Precio Gesti\u00f3n de Desv\u00edos subir","description":"The mechanism of deviation management is a service of a facultative nature which aims to resolve the deviation between generation and consumption which may appear after the closure of each intraday market session and until the start of the effectiveness horizon of the following session. The\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"669","name":"Downward Imbalance Management price","name_es":"Precio Gesti\u00f3n de Desv\u00edos bajar","description":"The mechanism of deviation management is a service of a facultative nature which aims to resolve the deviation between generation and consumption which may appear after the closure of each intraday market session and until the start of the effectiveness horizon of the following session. The\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"684","name":"Opposite imbalances sense","name_es":"Sentido de los desv\u00edos contrarios al sistema","description":"The measured imbalances are the difference between the scheduled energy and the measured energy. The imbalances price is calculated in accordance to the O.P. 14.4. It is calculated as: %CostOppositeDev = 100 x (Price Deviation downwards - (Price Deviation Upwards)/ Marginal Daily Price\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"685","name":"Opposite imbalance cost as % DMP","name_es":"Coste del desv\u00edos contrario respecto al precio del mercado SPOT diario","description":"The measured imbalances are the difference between the scheduled energy and the measured energy. The imbalances price is calculated in accordance to the O.P. 14.4. In particular, this indicator refers to the percentage underpaid or overpaid respect the daily market price. It is calculated as:\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"763","name":"Measured Upward imbalances price","name_es":"Precio de los desv\u00edos medidos a subir","description":"The measured imbalances are the difference between the scheduled energy and the measured energy. The imbalances price is calculated in accordance to the O.P. 14.4. Publication: daily at 7:45 with the information of the previous day and from 19:30 for past days according to the settlements calendar.","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"764","name":"Measured imbalances downward price","name_es":"Precio de los desv\u00edos medidos a bajar","description":"The measured imbalances are the difference between the scheduled energy and the measured energy. The imbalances price is calculated in accordance to the O.P. 14.4. Publication: daily at 7:45 with the information of the previous day and from 19:30 for past days according to the settlements calendar.","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"765","name":"Imbalances price upward / D-1 Market price","name_es":"Precio del desv\u00edo medido entre precio marginal diario a subir","description":"The measured imbalances are the difference between the scheduled energy and the measured energy. The imbalances price is calculated in accordance to the O.P. 14.4. In particular, this indicator refers to the quotient between the upwards measured deviation price and the daily market marginal price.\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"766","name":"Imbalances price downward / D-1 Market price","name_es":"Precio del desv\u00edo medido entre precio marginal diario a bajar","description":"The measured imbalances are the difference between the scheduled energy and the measured energy. The imbalances price is calculated in accordance to the O.P. 14.4. In particular, this indicator refers to the quotient between the downwards measured deviation price and the daily market marginal\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"767","name":"Imbalances Excess/Deficit","name_es":"Exceso/d\u00e9ficit de desv\u00edos medidos","description":"Balance resulting from adding the energies managed finally in every system ancillary services with the energy used in the calculation of the measured imbalances price. This energy is calculated as the total energy balance from the Replacement Reserves (RR), tertiary regulation and secondary\u2026","category":"Balancing services","subcategory":"Imbalances","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"626","name":"Upward reserve power requirements","name_es":"Requerimientos Reserva de potencia adicional a subir","description":"The contracting and management of the additional upwards power reserve is a complementary service of mandatory bid, managed and remunerated by market mechanisms. It aims to contract the upwards additional power reserve that may be necessary regarding the available one in the Daily Viable Schedule\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"627","name":"Allocation Reserva de potencia adicional a up","name_es":"Asignaci\u00f3n Reserva de potencia adicional a subir","description":"The contracting and management of the additional upwards power reserve is a complementary service of mandatory bid, managed and remunerated by market mechanisms. It aims to contract the upwards additional power reserve that may be necessary regarding the available one in the Daily Viable Schedule\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"628","name":"Upward reserve power maginal price","name_es":"Precio Reserva de potencia adicional a subir","description":"The contracting and management of the additional upwards power reserve is a complementary service of mandatory bid, managed and remunerated by market mechanisms. It aims to contract the upwards additional power reserve that may be necessary regarding the available one in the Daily Viable Schedule\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"711","name":"Upward reserve power cost","name_es":"Coste de Reserva de Potencia Adicional a Subir","description":"The contracting and management of the additional upwards power reserve is a complementary service of mandatory bid, managed and remunerated by market mechanisms. It aims to contract the upwards additional power reserve that may be necessary regarding the available one in the Daily Viable Schedule\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"762","name":"Net balancing energy","name_es":"Energ\u00eda neta de balance","description":"Balance of the energies coming from the Replacement Reserves (RR), tertiary regulation and secondary regulation. It is based on the measured imbalances and it is used to calculate the imbalances price. The measured imbalances are the difference between the scheduled energy and the measured energy.\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"836","name":"Interruptibility service providers demand Wood","name_es":"Demanda proveedores del servicio de interrumpibilidad Madera","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. In particular, this indicator refers to the interruptibility service providers\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"837","name":"Interruptibility service providers demand Steel","name_es":"Demanda proveedores del servicio de interrumpibilidad Siderurgia","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. In particular, this indicator refers to the interruptibility service providers\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"838","name":"Interruptibility service providers demand Paper","name_es":"Demanda proveedores del servicio de interrumpibilidad Papel","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. In particular, this indicator refers to the interruptibility service providers\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"839","name":"Interruptibility service providers demand Desalination","name_es":"Demanda proveedores del servicio de interrumpibilidad Desalaci\u00f3n","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. In particular, this indicator refers to the interruptibility service providers\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"840","name":"Interruptibility service providers demand Metallurgy","name_es":"Demanda proveedores del servicio de interrumpibilidad Metalurgia","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. In particular, this indicator refers to the interruptibility service providers\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"841","name":"Interruptibility service providers demand Chemistry","name_es":"Demanda proveedores del servicio de interrumpibilidad Qu\u00edmica","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. In particular, this indicator refers to the interruptibility service providers\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"842","name":"Interruptibility service providers demand Machinery","name_es":"Demanda proveedores del servicio de interrumpibilidad Maquinaria","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. In particular, this indicator refers to the interruptibility service providers\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"844","name":"Interruptibility service providers demand Glass","name_es":"Demanda proveedores del servicio de interrumpibilidad Vidrio","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. In particular, this indicator refers to the interruptibility service providers\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"845","name":"Interruptibility service providers demand Cement","name_es":"Demanda proveedores del servicio de interrumpibilidad Cemento","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. In particular, this indicator refers to the interruptibility service providers\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"846","name":"Interruptibility service providers demand Various","name_es":"Demanda proveedores del servicio de interrumpibilidad Varios","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. In particular, this indicator refers to the interruptibility service providers\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"847","name":"Interruptibility service providers demand","name_es":"Demanda proveedores del servicio de interrumpibilidad","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. This indicator can be broken down by Autonomous Regions Publication: every 10\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1397","name":"Request of application of the interruptibility service by economic criteria","name_es":"Solicitud de aplicaci\u00f3n del servicio interrumpibilidad por criterios econ\u00f3micos","description":"This indicator provides hourly data of the request made by the system operator of the application of the interruptibility service by economic criteria. Publication: : within the hour following the request of an application.","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1398","name":"Request of application of the interruptibility service by technical criteria","name_es":"Solicitud de aplicaci\u00f3n del servicio interrumpibilidad por criterios t\u00e9cnicos","description":"This indicator provides hourly data of the request made by the system operator of the application of the interruptibility service by technical criteria. Publication: within the hour following the request of an application.","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1399","name":"Request of application of the interruptibility service to verify the effective functioning of the service","name_es":"Solicitud de aplicaci\u00f3n del servicio interrumpibilidad a efectos de comprobaci\u00f3n del funcionamiento efectivo del servicio","description":"This indicator provides hourly data of the request made by the system operator of the application of the interruptibility service to verify the effective functioning of the service. Publication: within the hour following the request of an application.","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1880","name":"Additional identified reserve needs in real time","name_es":"Necesidades de reserva adicional identificadas en Tiempo Real","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1881","name":"Additional reserve scheduled in real time","name_es":"Reserva adicional programada en Tiempo Real","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1928","name":"Number of activations","name_es":"N\u00famero de activaciones","description":"Number of activations","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1929","name":"Activated power in active demand response service","name_es":"Potencia activada en el servicio de respuesta activa de la demanda","description":"Active demand response service is a specific balance service of Spanish Electrical System that aims to deal with situations of shortage of upward balancing reserves by obtaining resources in addition to those already available through the use of standard European balancing services. This service\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1930","name":"Marginal price in active demand response service","name_es":"Precio marginal en el servicio de respuesta activa de la demanda","description":"Active demand response service is a specific balance service of Spanish Electrical System that aims to deal with situations of shortage of upward balancing reserves by obtaining resources in addition to those already available through the use of standard European balancing services. This service\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1931","name":"Energy allocated in active demand response service","name_es":"Energ\u00eda asignada en el servicio de respuesta activa de la demanda","description":"Active demand response service is a specific balance service of Spanish Electrical System that aims to deal with situations of shortage of upward balancing reserves by obtaining resources in addition to those already available through the use of standard European balancing services. This service\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2109","name":"France Import Emergency Support Program","name_es":"Programa de apoyo de emergencia Francia importaci\u00f3n","description":"Support established under the request of a system that need assistance to solve an emergency situation when there aren\u2019t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation\u2026","category":"Balancing services","subcategory":"Other services","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2110","name":"France export Emergency Support Program","name_es":"Programa de apoyo de emergencia Francia exportaci\u00f3n","description":"Support established under the request of a system that need assistance to solve an emergency situation when there aren\u2019t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation\u2026","category":"Balancing services","subcategory":"Other services","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2111","name":"Portugal Import Emergency Support Program","name_es":"Programa de apoyo de emergencia Portugal importaci\u00f3n","description":"Support established under the request of a system that need assistance to solve an emergency situation when there aren\u2019t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation\u2026","category":"Balancing services","subcategory":"Other services","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2112","name":"Portugal export Emergency Support Program","name_es":"Programa de apoyo de emergencia Portugal exportaci\u00f3n","description":"Support established under the request of a system that need assistance to solve an emergency situation when there aren\u2019t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation\u2026","category":"Balancing services","subcategory":"Other services","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2113","name":"Morocco Import Emergency Support Program","name_es":"Programa de apoyo de emergencia Marruecos importaci\u00f3n","description":"Support established under the request of a system that need assistance to solve an emergency situation when there aren\u2019t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation\u2026","category":"Balancing services","subcategory":"Other services","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2114","name":"Morocco export Emergency Support Program","name_es":"Programa de apoyo de emergencia Marruecos exportaci\u00f3n","description":"Support established under the request of a system that need assistance to solve an emergency situation when there aren\u2019t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation\u2026","category":"Balancing services","subcategory":"Other services","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2115","name":"Andorra Import Emergency Support Program","name_es":"Programa de apoyo de emergencia Andorra importaci\u00f3n","description":"Support established under the request of a system that need assistance to solve an emergency situation when there aren\u2019t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation\u2026","category":"Balancing services","subcategory":"Other services","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2116","name":"Andorra export Emergency Support Program","name_es":"Programa de apoyo de emergencia Andorra exportaci\u00f3n","description":"Support established under the request of a system that need assistance to solve an emergency situation when there aren\u2019t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation\u2026","category":"Balancing services","subcategory":"Other services","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10059","name":"Interruptibility service providers demand Sectors","name_es":"Demanda proveedores del servicio de interrumpibilidad Sectores","description":"Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. The breakdown of this indicator details the interruptible demand by industrial\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10321","name":"Security energy allocated upward","name_es":"Energ\u00eda asignada por seguridad a subir","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10322","name":"Security energy allocated downward","name_es":"Energ\u00eda asignada por seguridad a bajar","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10392","name":"Weighted average price of additional reserve scheduled in real time","name_es":"Precio medio ponderado programaci\u00f3n de reserva adicional Tiempo Real","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10412","name":"Weighted average price active demand response service","name_es":"Precio medio ponderado de activaci\u00f3n del servicio de respuesta activa de la demanda ","description":"Active demand response service is a specific balance service of Spanish Electrical System that aims to deal with situations of shortage of upward balancing reserves by obtaining resources in addition to those already available through the use of standard European balancing services. This service\u2026","category":"Balancing services","subcategory":"Other services","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"666","name":"Replacement Reserves (RR) satisficed upward need","name_es":"Necesidades cubiertas de energ\u00edas de balance RR subir","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"667","name":"Replacement Reserves (RR) satisficed downward need","name_es":"Necesidades cubiertas de energ\u00edas de balance RR bajar","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"715","name":"Replacement Reserves payment obligations","name_es":"Obligaciones de Pago de las necesidades cubiertas de energ\u00edas de balance RR","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in the European\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1782","name":"Replacement Reserves (RR) prices","name_es":"Precio energ\u00edas de balance RR","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. This service is\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1783","name":"Upward RR allocation in SES","name_es":"Asignaci\u00f3n a subir de energ\u00edas de balance RR SEE","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1784","name":"Downward RR allocation in SES","name_es":"Asignaci\u00f3n a bajar de energ\u00edas de balance RR SEE","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1787","name":"Requested inelastic needs of Replacement Reserves (RR)","name_es":"Necesidad inel\u00e1stica solicitada de energ\u00edas de balance RR","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1870","name":"Requested elastic needs of Replacement Reserves (RR)","name_es":"Necesidad el\u00e1stica solicitada de energ\u00edas de balance RR","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10054","name":"Replacement Reserves (RR) satisficed need net absolute volume","name_es":"Volumen absoluto de necesidades cubiertas de energ\u00edas de balance RR","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10251","name":"Replacement Reserves (RR) satisficed need net volume","name_es":"Volumen neto de necesidades cubiertas de energ\u00edas de balance RR","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10383","name":"Total requested needs of Replacement Reserves (RR)","name_es":"Necesidad total solicitada de energ\u00edas de balance RR","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10384","name":"Weighted average price upward satisfied needs of replacement reserve (RR)","name_es":"Precio medio ponderado de las necesidades cubiertas de energ\u00edas de balance RR a subir","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. This service is\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10385","name":"Weighted average price downward satisfied needs of replacement reserve (RR)","name_es":"Precio medio ponderado de las necesidades cubiertas de energ\u00edas de balance RR a bajar","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated by O.P.-3.3. In particular, this\u2026","category":"Balancing services","subcategory":"RR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"720","name":"Energy for Real Time Upward Technical Constraints","name_es":"Energ\u00eda asignada por restricciones en tiempo real a subir","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"721","name":"Energy for Real Time Downward Technical Constraints","name_es":"Energ\u00eda asignada por restricciones en tiempo real a bajar","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"722","name":"Average price of energy for real time Upward technical constraints","name_es":"Precio medio de soluci\u00f3n de Restricciones T\u00e9cnicas de Seguridad en Tiempo Real subir","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"723","name":"Average price of downward energy for real time technical constraints","name_es":"Precio medio de soluci\u00f3n de Restricciones T\u00e9cnicas de Seguridad en Tiempo Real bajar","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"724","name":"Real time technical constraints cost","name_es":"Coste del proceso de soluci\u00f3n de Restricciones T\u00e9cnicas de Seguridad en Tiempo Real","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"725","name":"Real time technical constraints unitary cost supported by the demand","name_es":"Coste unitario soportado por la demanda del proceso de soluci\u00f3n de Restricciones T\u00e9cnicas de Seguridad en Tiempo Real","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1723","name":"Real time upward technical constraints cost","name_es":"Coste del proceso de soluci\u00f3n de Restricciones T\u00e9cnicas de Seguridad en Tiempo Real a Subir","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1724","name":"Real time downward technical constraints cost","name_es":"Coste del proceso de soluci\u00f3n de Restricciones T\u00e9cnicas de Seguridad en Tiempo Real a Bajar","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1726","name":"Restricted energy with payment obligations for Real Time Downward Technical Constraints","name_es":"Energ\u00eda limitada con derechos de cobro por restricciones en tiempo real a bajar","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1802","name":"Real time technical constraints energy allocated upward technical constraints SCB","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Subir SCB","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1803","name":"Real time technical constraints energy allocated downward technical constraints SCB","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Bajar SCB","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1804","name":"Real time technical constraints energy allocated upward SCA","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Subir SCA","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1805","name":"Real time technical constraints energy allocated downward SCA","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Bajar SCA","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1806","name":"Real time technical constraints energy allocated upward CT","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Subir CT","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1807","name":"Real time technical constraints energy allocated downward CT","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Bajar CT","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1808","name":"Real time technical constraints energy allocated upward RTD","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Subir RTD","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1809","name":"Real time technical constraints energy allocated downward RTD","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Bajar RTD","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1812","name":"Real time technical constraints energy allocated upward others","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Subir Otros","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1813","name":"Real time technical constraints energy allocated downward others","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Bajar Otros","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1814","name":"Real time technical constraints energy allocated upward RSI","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Subir RSI","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1815","name":"Real time technical constraints energy allocated downward RSI","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Bajar RSI","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1816","name":"Real time technical constraints energy allocated upward RBI","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Subir RBI","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1817","name":"Real time technical constraints energy allocated downward RBI","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Bajar RBI","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1818","name":"Real time technical constraints energy allocated upward ASE","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Subir ASE","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1819","name":"Real time technical constraints energy allocated downward ASE","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Bajar ASE","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10052","name":"Absolute volume Energy for Real Time Technical Constraints Solution","name_es":"Volumen absoluto de Energ\u00eda asignada por restricciones en tiempo real","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. The\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10253","name":"Net volume Energy for Real Time Technical Constraints Solution","name_es":"Volumen neto de Energ\u00eda asignada por restricciones en tiempo real","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. The\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10340","name":"Weighted average price of energy for real time Upward technical constraints","name_es":"Precio medio ponderado de soluci\u00f3n de Restricciones T\u00e9cnicas de Seguridad en Tiempo Real subir","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10341","name":"Weighted average price of energy for real time Downward technical constraints","name_es":"Precio medio ponderado de soluci\u00f3n de Restricciones T\u00e9cnicas de Seguridad en Tiempo Real bajar","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10368","name":"Real time technical constraints energy allocated absolute volume technical constraints SCB","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Absoluto SCB","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10369","name":"Real time technical constraints energy allocated absolute volume SCA","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Absoluto SCA","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10370","name":"Real time technical constraints energy allocated absolute volume CT","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Absoluto CT","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10371","name":"Real time technical constraints energy allocated absolute volume RTD","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Absoluto RTD","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10373","name":"Real time technical constraints energy allocated absolute volume others","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Absoluto Otros","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10374","name":"Real time technical constraints energy allocated absolute volume RSI","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Absoluto RSI","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10375","name":"Real time technical constraints energy allocated absolute volume RBI","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Absoluto RBI","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10376","name":"Real time technical constraints energy allocated absolute volume ASE","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas en tiempo real Absoluto ASE","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10377","name":"Quarter-hourly average price technical constraints","name_es":"Precio medio cuarto horario componente restricciones t\u00e9cnicas","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of technical constraints within the weighted average quarter-hourly energy price for all types of consumers. For\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10456","name":"Renewable curtailment in day-ahead technical constraints market due to congestions in the transmission grid (RTT)","name_es":"Porcentaje de Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas RTT en el PDBF Fase 1","description":"The day-ahead technical constraints market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (PDBF) through the modification of the schedules of the Programming Units by security criteria (Phase\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10457","name":"Renewable curtailment in day-ahead technical constraints market due to conges-tions in the distribution grid (RTD)","name_es":"Porcentaje de Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas RTD en PDBF Fase 1","description":"The day-ahead technical constraints market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (PDBF) through the modification of the schedules of the Programming Units by security criteria (Phase\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10458","name":"Renewable curtailment in real-time technical constraints market due to congestions in the transmission grid (RTT)","name_es":"Porcentaje de Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas RTT en tiempo real","description":"The real-time technical constraints market is carried out by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. This indicator\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10459","name":"Renewable curtailment in real-time technical constraints market due to congestions in the distribution grid (RTD)","name_es":"Porcentaje de Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas RTD en tiempo real","description":"The real-time technical constraints market is carried out by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. This indicator\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10460","name":"Renewable curtailment due to technical constraints in the transmission grid (RTT)","name_es":"Porcentaje de Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas en la RTT","description":"The technical constraints market is performed by the System Operator consisting on the resolution of technical constraints identified in the Spanish peninsular electric system in the Base Daily Operating Schedule (PDBF) and during the operation in real time. This service is regulated on the\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10461","name":"Renewable curtailment due to technical constraints in the distribution grid (RTD)","name_es":"Porcentaje de Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas en la RTD","description":"The technical constraints market is performed by the System Operator consisting on the resolution of technical constraints identified in the Spanish peninsular electric system in the Base Daily Operating Schedule (PDBF) and during the operation in real time. This service is regulated on the\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10462","name":"Renewable curtailment due to technical constraints in the grid","name_es":"Porcentaje de Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas ","description":"The technical constraints market is performed by the System Operator consisting on the resolution of technical constraints identified in the Spanish peninsular electric system in the Base Daily Operating Schedule (PDBF) and during the operation in real time. This service is regulated on the\u2026","category":"Balancing services","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"630","name":"aFRR Reserve requirements upward","name_es":"Requerimientos reserva de regulaci\u00f3n secundaria a subir","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"631","name":"aFRR Reserve requirements downward","name_es":"Requerimientos reserva de regulaci\u00f3n secundaria a bajar","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"632","name":"aFRR Reserve allocation upward","name_es":"Asignaci\u00f3n reserva de regulaci\u00f3n secundaria a subir","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"633","name":"aFRR Reserve allocation downward","name_es":"Asignaci\u00f3n reserva de regulaci\u00f3n secundaria a bajar","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"634","name":"aFRR Reserve marginal price downward","name_es":"Precio reserva de regulaci\u00f3n secundaria a bajar","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"680","name":"aFRR Activated energy upward","name_es":"Energ\u00eda activada de regulaci\u00f3n secundaria a subir en el sepe","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"681","name":"aFRR Activated energy downward","name_es":"Energ\u00eda activada de regulaci\u00f3n secundaria a bajar en el sepe","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"682","name":"aFRR Energy marginal price upward","name_es":"Precio de energ\u00eda de regulaci\u00f3n secundaria a subir","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"683","name":"aFRR Energy marginal price downward","name_es":"Precio de energ\u00eda de regulaci\u00f3n secundaria a bajar","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"712","name":"aFRR Reserve cost upward","name_es":"Coste de reserva de regulaci\u00f3n secundaria a subir","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"713","name":"Unit cost supported by the demand for secondary regulation reserve","name_es":"Coste unitario soportado por la demanda de reserva de regulaci\u00f3n secundaria","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"719","name":"aFRR Energy payments obligations","name_es":"Obligaciones de pago por energ\u00eda de regulaci\u00f3n secundaria","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"899","name":"aFRR Reserve allocation cost upward","name_es":"Coste asignaci\u00f3n de reserva de regulaci\u00f3n secundaria a subir","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2127","name":"aFRR Reserve cost downward","name_es":"Coste de reserva de regulaci\u00f3n secundaria a bajar","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2129","name":"aFRR Reserve allocation cost downward","name_es":"Coste asignaci\u00f3n de reserva de regulaci\u00f3n secundaria a bajar","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2130","name":"aFRR Reserve marginal price upward","name_es":"Precio Reserva de regulaci\u00f3n secundaria a subir","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2207","name":"aFRR activated energy upward","name_es":"Necesidad de energ\u00eda de regulaci\u00f3n secundaria subir en el sepe","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2208","name":"aFRR activated energy downward","name_es":"Necesidad de energ\u00eda de regulaci\u00f3n secundaria bajar en el sepe","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2318","name":"Number of enabled BSPs in aFRR balancing service","name_es":"N\u00famero de BSPs habilitados en servicio de balance aFRR","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2329","name":"Enabled capacity in aFRR Cogeneration","name_es":"Potencia habilitada en aFRR Cogeneraci\u00f3n","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2330","name":"Enabled capacity in aFRR Wind","name_es":"Potencia habilitada en aFRR E\u00f3lica","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2331","name":"Enabled capacity in aFRR Other Renewables","name_es":"Potencia habilitada en aFRR Otras Renovables","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2332","name":"Enabled capacity in aFRR Non-Renewable Waste","name_es":"Potencia habilitada en aFRR Residuos no Renovables","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2333","name":"Enabled capacity in aFRR Solar Thermal","name_es":"Potencia habilitada en aFRR Solar T\u00e9rmica","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2334","name":"Enabled capacity in aFRR Solar Photovoltaic","name_es":"Potencia habilitada en aFRR Solar Fotovoltaica","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2335","name":"Enabled capacity in aFRR Hydraulics","name_es":"Potencia habilitada en aFRR Hidr\u00e1ulica","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2336","name":"Enabled capacity in aFRR Hybridization","name_es":"Potencia habilitada en aFRR Hibridaci\u00f3n","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2337","name":"Enabled capacity in aFRR Storage","name_es":"Potencia habilitada en aFRR Almacenamiento","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10056","name":"aFRR Absolute volume of activated energy","name_es":"Volumen absoluto de energ\u00eda utilizada de regulaci\u00f3n secundaria","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10388","name":"aFRR Reserve weighted average price upward","name_es":"Precio medio ponderado reserva de regulaci\u00f3n secundaria a subir","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10463","name":"aFRR Reserve weighted average price downward","name_es":"Precio medio ponderado reserva de regulaci\u00f3n secundaria a bajar","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Balancing services","subcategory":"aFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"entsoe","id":"A37","name":"Balancing energy bids, mFRR, Spain (12.3.B/C)","name_es":null,"description":"Planned, parked: per-bid mFRR prices and volumes, to fill missing mFRR price with the mid-price at 100 MW depth. Needs the ENTSO-E File Library (API keeps ~100 days only). See PLAN.md.","category":"Balancing services","subcategory":"mFRR","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"672","name":"Upward Tertiary reserve needs","name_es":"Necesidad de Regulaci\u00f3n Terciaria subir","description":"The tertiary regulation is a complementary service of mandatory bid, managed and remunerated by market mechanisms. It aims to restore the secondary regulation reserve that has not been used. The allocation of the tertiary regulation service is done taking into account the bids sent to that end by\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"673","name":"Downward Tertiary reserve needs","name_es":"Necesidad de Regulaci\u00f3n Terciaria bajar","description":"The tertiary regulation is a complementary service of mandatory bid, managed and remunerated by market mechanisms. It aims to destitute the secondary regulation reserve that has not been used. The allocation of the tertiary regulation service is done taking into account the bids sent to that end\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"674","name":"Downward mFRR allocation scheduled activation","name_es":"Asignaci\u00f3n programada a bajar de energ\u00edas mFRR SEE (AP)","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"675","name":"Upward mFRR allocation scheduled activation","name_es":"Asignaci\u00f3n programada a subir de energ\u00edas mFRR SEE (AP)","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"676","name":"Downward scheduled activation tertiary reserve price (SA)","name_es":"Precio marginal regulaci\u00f3n terciaria a bajar de activaci\u00f3n programada (AP)","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"677","name":"Upward scheduled activation tertiary reserve price (SA)","name_es":"Precio marginal regulaci\u00f3n terciaria a subir de activaci\u00f3n programada (AP)","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"717","name":"mFRR satisfied needs payment obligations","name_es":"Obligaciones de Pago de las necesidades cubiertas de energ\u00edas mFRR","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1788","name":"Upward mFRR reserve requirements","name_es":"Requerimientos de reserva a subir de energ\u00edas de balance mFRR","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1789","name":"Downward mFRR reserve requirements","name_es":"Requerimientos de reserva a bajar de energ\u00edas de balance mFRR","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1883","name":"Downward mFRR allocation from direct activation QH1","name_es":"Asignaci\u00f3n directa a bajar de energ\u00edas mFRR SEE (AD, QH1)","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1884","name":"Upward mFRR allocation from direct activation QH0","name_es":"Asignaci\u00f3n directa a subir de energ\u00edas mFRR SEE (AD, QH0)","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1885","name":"Downward mFRR allocation from direct activation QH0","name_es":"Asignaci\u00f3n directa a bajar de energ\u00edas mFRR SEE (AD, QH0)","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1886","name":"Upward mFRR allocation from direct activation QH1","name_es":"Asignaci\u00f3n directa a subir de energ\u00edas mFRR SEE (AD, QH1)","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1891","name":"Downward mFRR scheduled activation satisfied need","name_es":"Necesidad cubierta de energ\u00edas mFRR a bajar de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1892","name":"Upward mFRR scheduled activation satisfied need","name_es":"Necesidad cubierta de energ\u00edas mFRR a subir de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1893","name":"Downward mFRR direct activation satisfied need","name_es":"Necesidad cubierta de energ\u00edas mFRR a bajar de activaci\u00f3n directa","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1894","name":"Upward mFRR direct activation satisfied need","name_es":"Necesidad cubierta de energ\u00edas mFRR a subir de activaci\u00f3n directa","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2186","name":"Elastic need for mFRR balancing energy to increase scheduled activation","name_es":"Necesidad el\u00e1stica solicitada de energ\u00edas de balance mFRR a subir de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2187","name":"Elastic need for mFRR balancing energy to decrease scheduled activation","name_es":"Necesidad el\u00e1stica solicitada de energ\u00edas de balance mFRR a bajar de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2190","name":"Elastic need covered for mFRR balancing energy to increase scheduled activation","name_es":"Necesidad el\u00e1stica cubierta de energ\u00edas de balance mFRR a subir de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2191","name":"Elastic need covered for mFRR balancing energy to decrease scheduled activation","name_es":"Necesidad el\u00e1stica cubierta de energ\u00edas de balance mFRR a bajar de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2196","name":"Elastic need price for scheduled activation of mFRR balancing energy","name_es":"Precio necesidad el\u00e1stica de energ\u00edas de balance mFRR de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2441","name":"Energy assigned to raise mFRR Residuos no renovables","name_es":"Energ\u00eda asignada a subir mFRR Residuos no renovables","description":"","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2442","name":"Energy assigned to lower mFRR Residuos no renovables","name_es":"Energ\u00eda asignada a bajar mFRR Residuos no renovables","description":"","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10386","name":"Weighted average price upward tertiary regulation","name_es":"Precio medio ponderado regulaci\u00f3n terciaria a subir","description":"Tertiary regulation is one of the active power balancing reserves activation services that aims to maintain the frequency and generation-demand balance in the system. This service, manually activated in a time period equal to or less than 15 minutes, is managed by the system operator through\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10387","name":"Weighted average price downward tertiary regulation","name_es":"Precio medio ponderado regulaci\u00f3n terciaria a bajar","description":"Tertiary regulation is one of the active power balancing reserves activation services that aims to maintain the frequency and generation-demand balance in the system. This service, manually activated in a time period equal to or less than 15 minutes, is managed by the system operator through\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10396","name":"Upward mFRR allocation direct activation","name_es":"Asignaci\u00f3n directa a subir de energ\u00edas mFRR SEE (AD)","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10397","name":"Downward mFRR allocation direct activation","name_es":"Asignaci\u00f3n directa a bajar de energ\u00edas mFRR SEE (AD)","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10398","name":"Weighted average price upward scheduled activation tertiary regulation","name_es":"Precio medio ponderado regulaci\u00f3n terciaria a subir de activaci\u00f3n programada (AP)","description":"Tertiary regulation is one of the active power balancing reserves activation services that aims to maintain the frequency and generation-demand balance in the system. This service, manually activated in a time period equal to or less than 15 minutes, is managed by the system operator through\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10399","name":"Weighted average price downward scheduled activation tertiary regulation","name_es":"Precio medio ponderado regulaci\u00f3n terciaria a bajar de activaci\u00f3n programada (AP)","description":"Tertiary regulation is one of the active power balancing reserves activation services that aims to maintain the frequency and generation-demand balance in the system. This service, manually activated in a time period equal to or less than 15 minutes, is managed by the system operator through\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10400","name":"Weighted average price upward direct activation tertiary regulation (AD)","name_es":"Precio medio ponderado regulaci\u00f3n terciaria a subir de activaci\u00f3n directa (AD)","description":"Tertiary regulation is one of the active power balancing reserves activation services that aims to maintain the frequency and generation-demand balance in the system. This service, manually activated in a time period equal to or less than 15 minutes, is managed by the system operator through\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10401","name":"Weighted average price downward direct activation tertiary regulation (AD)","name_es":"Precio medio ponderado regulaci\u00f3n terciaria a bajar de activaci\u00f3n directa (AD)","description":"Tertiary regulation is one of the active power balancing reserves activation services that aims to maintain the frequency and generation-demand balance in the system. This service, manually activated in a time period equal to or less than 15 minutes, is managed by the system operator through\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10485","name":"Total requested need for mFRR balancing energy for scheduled activation","name_es":"Necesidad total solicitada de energ\u00edas de balance mFRR de activaci\u00f3n programada","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Balancing services","subcategory":"mFRR","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"95","name":"Outages_FRA_Planned","name_es":null,"description":"xml file, O: Generation and consumption, Exchanges","category":"Bulk files (archives)","subcategory":"Exchanges","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"48","name":"Monthly_Auction_Spec_EF","name_es":null,"description":"pdf file, monthly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"49","name":"Monthly_Auction_Spec_FE","name_es":null,"description":"pdf file, monthly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"50","name":"Yearly_Auction_Spec_EF","name_es":null,"description":"pdf file, yearly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"51","name":"Yearly_Auction_Spec_FE","name_es":null,"description":"pdf file, yearly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"69","name":"INF_SUBASTA_MM","name_es":null,"description":"pdf file, monthly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"87","name":"Monthly_Result_Auction_FRA","name_es":null,"description":"xls file, monthly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"88","name":"Yearly_Result_Auction_FRA","name_es":null,"description":"xls file, yearly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"147","name":"Monthly_Auction_Spec_EP","name_es":null,"description":"pdf file, monthly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"148","name":"Monthly_Auction_Spec_PE","name_es":null,"description":"pdf file, monthly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"149","name":"Quarterly_Auction_Spec_EP","name_es":null,"description":"pdf file, quarterly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"150","name":"Quarterly_Auction_Spec_PE","name_es":null,"description":"pdf file, quarterly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"151","name":"Yearly_Auction_Spec_EP","name_es":null,"description":"pdf file, yearly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"152","name":"Yearly_Auction_Spec_PE","name_es":null,"description":"pdf file, yearly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"159","name":"Monthly_Result_Auction_POR","name_es":null,"description":"xls file, monthly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"160","name":"Yearly_Result_Auction_POR","name_es":null,"description":"xls file, yearly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"161","name":"Quarterly_Result_Auction_POR","name_es":null,"description":"xls file, quarterly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"244","name":"Yearly_Result_Auction_Ear_FRA","name_es":null,"description":"xls file, yearly: Markets and prices, Explicit auctions","category":"Bulk files (archives)","subcategory":"Explicit auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"40","name":"COEF_KEST_MM","name_es":null,"description":"xls file, monthly: Generation and consumption, Markets and prices, Non peninsular systems, Settlements, Losses","category":"Bulk files (archives)","subcategory":"Losses","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"78","name":"perfilconsumo","name_es":null,"description":"xml file, S: Markets and prices, PVPC","category":"Bulk files (archives)","subcategory":"PVPC","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"29","name":"totalp48","name_es":null,"description":"xml file, hourly: Generation and consumption, Schedules","category":"Bulk files (archives)","subcategory":"Schedules","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"2","name":"A1_liquicomun","name_es":null,"description":"zip file, monthly: Markets and prices, Settlements","category":"Bulk files (archives)","subcategory":"Settlements","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"27","name":"totalrp48prec","name_es":null,"description":"xml file, hourly: Markets and prices, Technical constraints","category":"Bulk files (archives)","subcategory":"Technical constraints","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios_archive","id":"106","name":"PlannedOutages","name_es":null,"description":"xls file, monthly: Generation and consumption, Unavailability","category":"Bulk files (archives)","subcategory":"Unavailability","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"464","name":"Installed capacity conventional generation Hydro UGH","name_es":"Potencia instalada de generaci\u00f3n convencional Hidr\u00e1ulica UGH","description":"Conventional generation installed power. Is the one which approved in a ruling by the Directorate General of Energy Policy and Mines for each installation. This value, once communicated to REE, is registered in the e\u00b7sios system. The net installed power will be expressed in MVW and will be\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"465","name":"Installed capacity conventional generation Turbine pumping","name_es":"Potencia instalada de generaci\u00f3n convencional Turbinaci\u00f3n bombeo","description":"Conventional generation installed power. Is the one which approved in a ruling by the Directorate General of Energy Policy and Mines for each installation. This value, once communicated to REE, is registered in the e\u00b7sios system. The net installed power will be expressed in MVW and will be\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"466","name":"Installed capacity conventional generation Nuclear","name_es":"Potencia instalada de generaci\u00f3n convencional Nuclear","description":"Conventional generation installed power. Is the one which approved in a ruling by the Directorate General of Energy Policy and Mines for each installation. This value, once communicated to REE, is registered in the e\u00b7sios system. The net installed power will be expressed in MVW and will be\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"467","name":"Installed capacity conventional generation Soft coal/Anthracite","name_es":"Potencia instalada de generaci\u00f3n convencional Hulla antracita","description":"Conventional generation installed power. Is the one which approved in a ruling by the Directorate General of Energy Policy and Mines for each installation. This value, once communicated to REE, is registered in the e\u00b7sios system. The net installed power will be expressed in MVW and will be\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"468","name":"Installed capacity conventional generation Sub-bituminous coal","name_es":"Potencia instalada de generaci\u00f3n convencional Hulla sub-bituminosa","description":"Conventional generation installed power. Is the one which approved in a ruling by the Directorate General of Energy Policy and Mines for each installation. This value, once communicated to REE, is registered in the e\u00b7sios system. The net installed power will be expressed in MVW and will be\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"469","name":"Installed capacity conventional generation Combined cycle GT","name_es":"Potencia instalada de generaci\u00f3n convencional Ciclo combinado","description":"Conventional generation installed power. Is the one which approved in a ruling by the Directorate General of Energy Policy and Mines for each installation. This value, once communicated to REE, is registered in the e\u00b7sios system. The net installed power will be expressed in MVW and will be\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"470","name":"Installed capacity conventional generation Fuel","name_es":"Potencia instalada de generaci\u00f3n convencional Fuel","description":"Conventional generation installed power. Is the one which approved in a ruling by the Directorate General of Energy Policy and Mines for each installation. This value, once communicated to REE, is registered in the e\u00b7sios system. The net installed power will be expressed in MVW and will be\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"471","name":"Installed capacity conventional generation Natural Gas","name_es":"Potencia instalada de generaci\u00f3n convencional Gas Natural","description":"Conventional generation installed power. Is the one which approved in a ruling by the Directorate General of Energy Policy and Mines for each installation. This value, once communicated to REE, is registered in the e\u00b7sios system. The net installed power will be expressed in MVW and will be\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"472","name":"Hydro UGH Available power generation capacity hourly horizon","name_es":"Potencia disponible de generaci\u00f3n Hidr\u00e1ulica UGH horizonte horario","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"473","name":"Turbine pumping Available power generation capacity hourly horizon","name_es":"Potencia disponible de generaci\u00f3n Turbinaci\u00f3n bombeo horizonte horario","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"474","name":"Nuclear Available power generation capacity hourly horizon","name_es":"Potencia disponible de generaci\u00f3n Nuclear horizonte horario","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"475","name":"Fossil Hard Available power generation capacity hourly horizon","name_es":"Potencia disponible de generaci\u00f3n Hulla antracita horizonte horario","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"476","name":"Sub-bituminous Available power generation capacity hourly horizon","name_es":"Potencia disponible de generaci\u00f3n Hulla sub-bituminosa horizonte horario","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"477","name":"Cycle GT Available power generation capacity hourly horizon","name_es":"Potencia disponible de generaci\u00f3n Ciclo combinado horizonte horario","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the programming\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"478","name":"Fuel Available power generation capacity hourly horizon","name_es":"Potencia disponible de generaci\u00f3n Fuel horizonte horario","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"479","name":"Natural Gas Available power generation capacity hourly horizon","name_es":"Potencia disponible de generaci\u00f3n Gas Natural horizonte horario","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"480","name":"Hydro UGH Available power generation capacity rolling year horizon","name_es":"Potencia disponible de generaci\u00f3n Hidr\u00e1ulica UGH horizonte a\u00f1o m\u00f3vil","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"481","name":"Turbine pumping Available power generation capacity rolling year horizon","name_es":"Potencia disponible de generaci\u00f3n Turbinaci\u00f3n bombeo horizonte a\u00f1o m\u00f3vil","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"482","name":"Nuclear Available power generation capacity rolling year horizon","name_es":"Potencia disponible de generaci\u00f3n Nuclear horizonte a\u00f1o m\u00f3vil","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"483","name":"Fossil Hard Available power generation capacity rolling year horizon","name_es":"Potencia disponible de generaci\u00f3n Hulla antracita horizonte a\u00f1o m\u00f3vil","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"484","name":"Sub-bituminous Available power generation capacity rolling year horizon","name_es":"Potencia disponible de generaci\u00f3n Hulla sub-bituminosa horizonte a\u00f1o m\u00f3vil","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"485","name":"Cycle GT Available power generation capacity rolling year horizon","name_es":"Potencia disponible de generaci\u00f3n Ciclo combinado horizonte a\u00f1o m\u00f3vil","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the programming\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"486","name":"Fuel Available power generation capacity rolling year horizon","name_es":"Potencia disponible de generaci\u00f3n Fuel horizonte a\u00f1o m\u00f3vil","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"487","name":"Natural Gas Available power generation capacity rolling year horizon","name_es":"Potencia disponible de generaci\u00f3n Gas Natural horizonte a\u00f1o m\u00f3vil","description":"Calculated, for each conventional generation production type, as the difference between the sum of the net installed powers registered in the e\u00c2\u00b7sios system and the total of the unavailable power declared by the Balance Responsible Parties. In particular, this indicator refers to the groups with\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1475","name":"Installed capacity generation hydro","name_es":"Potencia instalada de generaci\u00f3n hidr\u00e1ulica","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1476","name":"Installed capacity generation turbine pumping","name_es":"Potencia instalada de turbinaci\u00f3n de bombeo","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1477","name":"Installed capacity generation nuclear","name_es":"Potencia instalada de generaci\u00f3n nuclear","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1478","name":"Installed capacity generation coal","name_es":"Potencia instalada de generaci\u00f3n carb\u00f3n","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1479","name":"Installed capacity generation diesel engines","name_es":"Potencia instalada de generaci\u00f3n motores diesel","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1480","name":"Installed capacity generation gas turbine","name_es":"Potencia instalada de generaci\u00f3n turbina de gas","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1481","name":"Installed capacity generation steam turbine","name_es":"Potencia instalada de generaci\u00f3n turbina de vapor","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1482","name":"Installed capacity generation fuel","name_es":"Potencia instalada de generaci\u00f3n fuel","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1483","name":"Installed capacity generation combined cycle GT","name_es":"Potencia instalada de generaci\u00f3n ciclo combinado","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1484","name":"Installed capacity generation hidroeolica","name_es":"Potencia instalada de generaci\u00f3n hidroe\u00f3lica","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1485","name":"Installed capacity generation wind","name_es":"Potencia instalada de generaci\u00f3n e\u00f3lica","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1486","name":"Installed capacity generation solar PV","name_es":"Potencia instalada de generaci\u00f3n solar fotovoltaica","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1487","name":"Installed capacity generation solar thermal","name_es":"Potencia instalada de generaci\u00f3n solar t\u00e9rmica","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1488","name":"Installed capacity generation other renewables","name_es":"Potencia instalada de generaci\u00f3n otras renovables","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1489","name":"Installed capacity generation cogeneration","name_es":"Potencia instalada de generaci\u00f3n cogeneraci\u00f3n","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1490","name":"Installed capacity generation non renewables Waste","name_es":"Potencia instalada de generaci\u00f3n residuos no renovables","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1491","name":"Installed capacity generation renewables Waste","name_es":"Potencia instalada de generaci\u00f3n residuos renovables","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1943","name":"Installed capacity of hydraulic self-consumption generation","name_es":"Potencia instalada de generaci\u00f3n autoconsumo hidr\u00e1ulica","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1944","name":"Installed capacity for self-consumption wind power generation","name_es":"Potencia instalada de generaci\u00f3n autoconsumo e\u00f3lica","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1945","name":"Installed power of photovoltaic solar self-consumption generation","name_es":"Potencia instalada de generaci\u00f3n autoconsumo solar fotovoltaica","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1946","name":"Installed power generation self-consumption cogeneration","name_es":"Potencia instalada de generaci\u00f3n autoconsumo cogeneraci\u00f3n","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1947","name":"Installed power generation self-consumption other renewables","name_es":"Potencia instalada de generaci\u00f3n autoconsumo otras renovables","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1948","name":"Installed power generation self-consumption renewable waste","name_es":"Potencia instalada de generaci\u00f3n autoconsumo residuos renovables","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2017","name":"Installed power generation self-consumption solar thermal","name_es":"Potencia instalada de generaci\u00f3n autoconsumo solar t\u00e9rmica","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2018","name":"Installed power generation self-consumption non-renewable waste","name_es":"Potencia instalada de generaci\u00f3n autoconsumo residuos no renovables","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2267","name":"Installed hybrid renewable capacity","name_es":"Potencia instalada h\u00edbrida renovable","description":"Installed hybrid renewable capacity (HIR)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2268","name":"Installed renewable hybrid capacity: non-renewable thermal energy","name_es":"Potencia instalada h\u00edbrida renovable-t\u00e9rmica no renovable","description":"Installed renewable hybrid capacity: non-renewable thermal energy (HRT)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2269","name":"Installed hybrid renewable capacity-storage","name_es":"Potencia instalada h\u00edbrida renovable-almacenamiento","description":"Installed hybrid renewable capacity-storage (HRA)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2270","name":"Installed hybrid non-renewable thermal capacity with storage","name_es":"Potencia instalada h\u00edbrida t\u00e9rmica no renovable con almacenamiento","description":"Installed hybrid non-renewable thermal capacity with storage (HTA)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2271","name":"Installed hybrid renewable capacity-no renewable thermal-storage","name_es":"Potencia instalada h\u00edbrida renovable-t\u00e9rmica no renovable-almacenamiento","description":"Installed hybrid renewable capacity-no renewable thermal-storage (HAT)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2272","name":"Installed capacity of hybridized photovoltaic solar generation","name_es":"Potencia instalada de generaci\u00f3n solar fotovoltaica h\u00edbridada","description":"Installed capacity of hybridized photovoltaic solar generation (SFH)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2273","name":"Installed capacity of hybridized wind generation","name_es":"Potencia instalada de generaci\u00f3n e\u00f3lica h\u00edbridada","description":"Installed capacity of hybridized wind generation (EOH)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2274","name":"Installed capacity of hybridized cogeneration generation","name_es":"Potencia instalada de generaci\u00f3n cogeneraci\u00f3n h\u00edbridada","description":"Installed capacity of hybridized cogeneration generation (COH)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2275","name":"Installed capacity of hybridized batteries","name_es":"Potencia instalada de bater\u00edas h\u00edbridada","description":"Installed capacity of hybridized batteries (BAH)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2358","name":"Installed capacity of hybridized hydraulic","name_es":"Potencia instalada de h\u00edbrida hidr\u00e1ulica","description":"Installed capacity of hybridized hydraulic (HHI)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2359","name":"Installed capacity of hybridized solar thermal","name_es":"Potencia instalada de h\u00edbrida solar t\u00e9rmica","description":"Installed capacity of hybridized solar thermal (HST)","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2366","name":"Installed capacity of self-consumption batteries","name_es":"Potencia instalada de autoconsumo bater\u00edas","description":"","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10001","name":"Total available power generation capacity hourly horizon","name_es":"Potencia disponible de generaci\u00f3n total horizonte horario","description":"Calculated as the summation of the available power of conventional generation hourly horizon. To visualize your composition please select Breakdown in the option Compare. The power available spreads till the end of the horizon with the last communication of unavailability done by the SM for each\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10003","name":"Total Installed power conventional generation","name_es":"Potencia instalada total de generaci\u00f3n convencional","description":"Conventional generation installed power. Is the one which approved in a ruling by the Directorate General of Energy Policy and Mines for each installation. This value, once communicated to REE, is registered in the e\u00b7sios system. The net installed power will be expressed in MVW and will be\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10232","name":"Total available power generation capacity rolling year horizon","name_es":"Potencia disponible de generaci\u00f3n total horizonte a\u00f1o m\u00f3vil","description":"Calculated as the summation of the available power of conventional generation hourly horizon. To visualize your composition please select Breakdown in the option Compare. The horizon in the 12 months shows the availability depending on the annual maintenance plan of the generator team planned for\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10300","name":"Installed capacity generation total","name_es":"Potencia instalada de generaci\u00f3n total","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10301","name":"Installed capacity generation total non renewable","name_es":"Potencia instalada de generaci\u00f3n total no renovable","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10302","name":"Installed capacity generation total renewable","name_es":"Potencia instalada de generaci\u00f3n total renovable","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10413","name":"Total self-consumption generation installed power","name_es":"Potencia instalada de generaci\u00f3n autoconsumo total","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10517","name":"Total installed hybrid capacity","name_es":"Potencia instalada de hibridaci\u00f3n total","description":"Total installed hybrid capacity","category":"Capacity","subcategory":"Installed / available","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1039","name":"Offered capacity daily auction import France","name_es":"Capacidad ofrecida subasta expl\u00edcita diaria con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1040","name":"Offered capacity daily auction export France","name_es":"Capacidad ofrecida subasta expl\u00edcita diaria con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1041","name":"Offered capacity intraday 1 auction import France","name_es":"Capacidad ofrecida subasta expl\u00edcita intradiaria1 con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1042","name":"Offered capacity intraday 1 auction export France","name_es":"Capacidad ofrecida subasta expl\u00edcita intradiaria1 con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1043","name":"Offered capacity intraday 2 auction import France","name_es":"Capacidad ofrecida subasta expl\u00edcita intradiaria2 con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1044","name":"Offered capacity intraday 2 auction export France","name_es":"Capacidad ofrecida subasta expl\u00edcita intradiaria2 con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1045","name":"Offered capacity monthly auction import France","name_es":"Capacidad ofrecida subasta expl\u00edcita mensual con Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1046","name":"Offered capacity monthly auction export France","name_es":"Capacidad ofrecida subasta expl\u00edcita mensual con Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1047","name":"Offered capacity annual auction import France","name_es":"Capacidad ofrecida subasta expl\u00edcita anual con Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1048","name":"Offered capacity annual auction export France","name_es":"Capacidad ofrecida subasta expl\u00edcita anual con Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1049","name":"Participants in daily auction import France","name_es":"Participantes en subasta expl\u00edcita diaria con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1050","name":"Participants in daily auction export France","name_es":"Participantes en subasta expl\u00edcita diaria con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1051","name":"Num. Holders in daily explicit auction import France","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita diaria con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1052","name":"Num. Holders in daily explicit auction export France","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita diaria con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1053","name":"Allocated capacity daily auction import France","name_es":"Capacidad asignada en subasta expl\u00edcita diaria con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1054","name":"Allocated capacity daily auction export France","name_es":"Capacidad asignada en subasta expl\u00edcita diaria con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1055","name":"Daily auction price import France","name_es":"Precio de subasta expl\u00edcita diaria con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1056","name":"Daily auction price export France","name_es":"Precio de subasta expl\u00edcita diaria con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1057","name":"Participants in intraday 1 auction import France","name_es":"Participantes en subasta expl\u00edcita intradiaria 1 con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1058","name":"Participants in intraday 1 auction export France","name_es":"Participantes en subasta expl\u00edcita intradiaria 1 con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1059","name":"Num. Holders in intraday 1 explicit auction import France","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita intradiaria 1 con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1060","name":"Num. Holders in intraday 1 explicit auction export France","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita intradiaria 1 con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1061","name":"Allocated capacity intraday 1 auction import France","name_es":"Capacidad asignada en subasta expl\u00edcita intradiaria 1 con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1062","name":"Allocated capacity intraday 1 auction export France","name_es":"Capacidad asignada en subasta expl\u00edcita intradiaria 1 con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1063","name":"Intraday 1 auction price import France","name_es":"Precio de subasta expl\u00edcita intradiaria 1 con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1064","name":"Intraday 1 auction price export France","name_es":"Precio de subasta expl\u00edcita intradiaria 1 con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1065","name":"Participants in intraday 2 auction import France","name_es":"Participantes en subasta expl\u00edcita intradiaria 2 con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1066","name":"Participants in intraday 2 auction export France","name_es":"Participantes en subasta expl\u00edcita intradiaria 2 con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1067","name":"Num. Holders in intraday 2 explicit auction import France","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita intradiaria 2 con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1068","name":"Num. Holders in intraday 2 explicit auction export France","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita intradiaria 2 con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1069","name":"Allocated capacity intraday 2 auction import France","name_es":"Capacidad asignada en subasta expl\u00edcita intradiaria 2 con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1070","name":"Allocated capacity intraday 2 auction export France","name_es":"Capacidad asignada en subasta expl\u00edcita intradiaria 2 con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1071","name":"Intraday 2 auction price import France","name_es":"Precio de subasta expl\u00edcita intradiaria 2 con Francia sentido importador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1072","name":"Intraday 2 auction price export France","name_es":"Precio de subasta expl\u00edcita intradiaria 2 con Francia sentido exportador","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1073","name":"Participants in monthly auction import France","name_es":"Participantes en subasta expl\u00edcita mensual con Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1074","name":"Participants in monthly auction export France","name_es":"Participantes en subasta expl\u00edcita mensual con Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1075","name":"Num. Holders in montly explicit auction import France","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita mensual con Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1076","name":"Num. Holders in montly explicit auction export France","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita mensual con Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1077","name":"Allocated capacity monthly auction import France","name_es":"Capacidad asignada en subasta expl\u00edcita mensual con Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1078","name":"Allocated capacity monthly auction export France","name_es":"Capacidad asignada en subasta expl\u00edcita mensual con Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1079","name":"Monthly auction price import France","name_es":"Precio de subasta expl\u00edcita mensual con Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1080","name":"Monthly auction price export France","name_es":"Precio de subasta expl\u00edcita mensual con Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1081","name":"Participants in annual auction import France","name_es":"Participantes en subasta expl\u00edcita anual con Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1082","name":"Participants in annual auction export France","name_es":"Participantes en subasta expl\u00edcita anual con Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1083","name":"Num. Holders in annual explicit auction import France","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita anual con Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1084","name":"Num. Holders in annual explicit auction export France","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita anual con Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1085","name":"Allocated capacity annual auction import France","name_es":"Capacidad asignada en subasta expl\u00edcita anual con Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1086","name":"Allocated capacity annual auction export France","name_es":"Capacidad asignada en subasta expl\u00edcita anual con Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1087","name":"Annual auction price import France","name_es":"Precio de subasta expl\u00edcita anual con Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1088","name":"Annual auction price export France","name_es":"Precio de subasta expl\u00edcita anual con Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1099","name":"Nominated capacity daily auction import France","name_es":"Capacidad Nominada subasta diaria con Francia importaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1100","name":"Nominated capacity daily auction export France","name_es":"Capacidad Nominada subasta diaria con Francia exportaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1101","name":"Nominated capacity intraday 1 auction import France","name_es":"Capacidad Nominada subasta intradiaria 1 con Francia importaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1102","name":"Nominated capacity intraday 1 auction export France","name_es":"Capacidad Nominada subasta intradiaria 1 con Francia exportaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1103","name":"Nominated capacity intraday 2 auction import France","name_es":"Capacidad Nominada subasta intradiaria 2 con Francia importaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1104","name":"Nominated capacity intraday 2 auction export France","name_es":"Capacidad Nominada subasta intradiaria 2 con Francia exportaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmission System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1107","name":"Congestion rents daily explicit auction import France","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita diaria Francia importaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmis-sion System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1108","name":"Congestion rents daily explicit auction export France","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita diaria Francia exportaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmis-sion System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1109","name":"Congestion rents intraday 1 explicit auction import France","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita intradiaria 1 Francia importaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmis-sion System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1110","name":"Congestion rents intraday 1 explicit auction export France","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita intradiaria 1 Francia exportaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmis-sion System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1111","name":"Congestion rents intraday 2 explicit auction import France","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita intradiaria 2 Francia importaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmis-sion System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1112","name":"Congestion rents intraday 2 explicit auction export France","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita intradiaria 2 Francia exportaci\u00f3n","description":"The explicit capacity auctions are a market mechanism to manage the interconnection France-Spain. For all the temporary horizons, the offered capacity is auctioned jointly by the electricity Transmis-sion System Operators (TSOs) in France and Spain, RTE and REE respectively. Capacity is auctioned\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1113","name":"Congestion rents monthly explicit auction import France","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita mensual Francia importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1114","name":"Congestion rents monthly explicit auction export France","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita mensual Francia exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1115","name":"Congestion rents annual explicit auction import France","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita anual Francia importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1116","name":"Congestion rents annual explicit auction export France","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita anual Francia exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1117","name":"Congestion rents for implicit mechanisms Day Ahead Import France","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos diario Francia importaci\u00f3n","description":"Gross income for the Spanish and French electricity systems derived from the allocation of exchange capacity through the coupling of daily markets 'Single Day-Ahead Coupling' (SDAC). These revenues are distributed between both systems in accordance with the European methodology derived from\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1118","name":"Congestion rents for implicit mechanisms Day Ahead Export France","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos diario Francia exportaci\u00f3n","description":"Gross income for the Spanish and French electricity systems derived from the allocation of exchange capacity through the coupling of daily markets 'Single Day-Ahead Coupling' (SDAC). These revenues are distributed between both systems in accordance with the European methodology derived from\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1119","name":"Congestion rents for implicit mechanisms Day Ahead Import Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos diario Portugal importaci\u00f3n","description":"Gross income for the Spanish and Portuguese electricity systems derived from the allocation of exchange capacity through the coupling of daily markets 'Single Day-Ahead Coupling' (SDAC). These revenues are distributed between both systems in accordance with the European methodology derived from\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1120","name":"Congestion rents for implicit mechanisms Day Ahead Export Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos diario Portugal exportaci\u00f3n","description":"Gross income for the Spanish and Portuguese electricity systems derived from the allocation of exchange capacity through the coupling of daily markets 'Single Day-Ahead Coupling' (SDAC). These revenues are distributed between both systems in accordance with the European methodology derived from\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1121","name":"Congestion rents for implicit mechanisms Intraday 1 Import Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 1 Portugal importaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1122","name":"Congestion rents for implicit mechanisms Intraday 2 Import Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 2 Portugal importaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1123","name":"Congestion rents for implicit mechanisms Intraday 3 Import Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 3 Portugal importaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1124","name":"Congestion rents for implicit mechanisms Intraday 4 Import Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 4 Portugal importaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1125","name":"Congestion rents for implicit mechanisms Intraday 5 Import Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 5 Portugal importaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1126","name":"Congestion rents for implicit mechanisms Intraday 6 Import Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 6 Portugal importaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1127","name":"Congestion rents for implicit mechanisms Intraday 7 Import Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 7 Portugal importaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1128","name":"Congestion rents for implicit mechanisms Intraday 1 Export Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 1 Portugal exportaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1129","name":"Congestion rents for implicit mechanisms Intraday 2 Export Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 2 Portugal exportaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1130","name":"Congestion rents for implicit mechanisms Intraday 3 Export Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 3 Portugal exportaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1131","name":"Congestion rents for implicit mechanisms Intraday 4 Export Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 4 Portugal exportaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1132","name":"Congestion rents for implicit mechanisms Intraday 5 Export Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 5 Portugal exportaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1133","name":"Congestion rents for implicit mechanisms Intraday 6 Export Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 6 Portugal exportaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1134","name":"Congestion rents for implicit mechanisms Intraday 7 Export Portugal","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 7 Portugal exportaci\u00f3n","description":"Gross income for the Spanish and Portuguese electrical systems derived from the allocation of exchange capacity in the import direction through implicit interconnection capacity management mechanisms. These income are distributed between both systems in accordance with the European methodology\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1632","name":"Offered capacity monthly auction import Portugal","name_es":"Capacidad ofrecida subasta expl\u00edcita mensual con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1633","name":"Offered capacity monthly auction export Portugal","name_es":"Capacidad ofrecida subasta expl\u00edcita mensual con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1634","name":"Offered capacity quarterly auction import Portugal","name_es":"Capacidad ofrecida subasta expl\u00edcita trimestral con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1635","name":"Offered capacity quarterly auction export Portugal","name_es":"Capacidad ofrecida subasta expl\u00edcita trimestral con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1636","name":"Offered capacity annual auction import Portugal","name_es":"Capacidad ofrecida subasta expl\u00edcita anual con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1637","name":"Offered capacity annual auction export Portugal","name_es":"Capacidad ofrecida subasta expl\u00edcita anual con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1638","name":"Participants in monthly auction import Portugal","name_es":"Participantes en subasta expl\u00edcita mensual con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1639","name":"Participants in monthly auction export Portugal","name_es":"Participantes en subasta expl\u00edcita mensual con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1640","name":"Num. Holders in monthly explicit auction import Portugal","name_es":"Participantes adjudicatarios en subasta expl\u00edcita mensual con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1641","name":"Num. Holders in monthly explicit auction export Portugal","name_es":"Participantes adjudicatarios en subasta expl\u00edcita mensual con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1642","name":"Allocated capacity monthly auction import Portugal","name_es":"Capacidad asignada en subasta expl\u00edcita mensual con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1643","name":"Allocated capacity monthly auction export Portugal","name_es":"Capacidad asignada en subasta expl\u00edcita mensual con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1644","name":"Monthly auction price import Portugal","name_es":"Precio de subasta expl\u00edcita mensual con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1645","name":"Monthly auction price export Portugal","name_es":"Precio de subasta expl\u00edcita mensual con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1646","name":"Participants in quarterly auction import Portugal","name_es":"Participantes en subasta expl\u00edcita trimestral con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1647","name":"Participants in quarterly auction export Portugal","name_es":"Participantes en subasta expl\u00edcita trimestral con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1648","name":"Num. Holders in quarterly explicit auction import Portugal","name_es":"Participantes adjudicatarios en subasta expl\u00edcita trimestral con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1649","name":"Num. Holders in quarterly explicit auction export Portugal","name_es":"Participantes adjudicatarios en subasta expl\u00edcita trimestral con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1650","name":"Allocated capacity quarterly auction import Portugal","name_es":"Capacidad asignada en subasta expl\u00edcita trimestral con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1651","name":"Allocated capacity quarterly auction export Portugal","name_es":"Capacidad asignada en subasta expl\u00edcita trimestral con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1652","name":"Quarterly auction price import Portugal","name_es":"Precio de subasta expl\u00edcita trimestral con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1653","name":"Quarterly auction price export Portugal","name_es":"Precio de subasta expl\u00edcita trimestral con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1654","name":"Participants in annual auction import Portugal","name_es":"Participantes en subasta expl\u00edcita anual con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1655","name":"Participants in annual auction export Portugal","name_es":"Participantes en subasta expl\u00edcita anual con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1656","name":"Num. Holders in annual explicit auction import Portugal","name_es":"Participantes adjudicatarios en subasta expl\u00edcita anual con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1657","name":"Num. Holders in annual explicit auction export Portugal","name_es":"Participantes adjudicatarios en subasta expl\u00edcita anual con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1658","name":"Allocated capacity annual auction import Portugal","name_es":"Capacidad asignada en subasta expl\u00edcita anual con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1659","name":"Allocated capacity annual auction export Portugal","name_es":"Capacidad asignada en subasta expl\u00edcita anual con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1660","name":"Annual auction price import Portugal","name_es":"Precio de subasta expl\u00edcita anual con Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1661","name":"Annual auction price export Portugal","name_es":"Precio de subasta expl\u00edcita anual con Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1662","name":"Congestion rents monthly explicit auction import Portugal","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita mensual Portugal importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1663","name":"Congestion rents monthly explicit auction export Portugal","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita mensual Portugal exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1664","name":"Congestion rents quarterly explicit auction import Portugal","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita trimestral Portugal importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1665","name":"Congestion rents quarterly explicit auction export Portugal","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita trimestral Portugal exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1666","name":"Congestion rents annual explicit auction import Portugal","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita anual Portugal importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1667","name":"Congestion rents annual explicit auction export Portugal","name_es":"Rentas de congesti\u00f3n subasta expl\u00edcita anual Portugal exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1674","name":"Reduced Long Term Capacity France import","name_es":"Capacidad Reducida Largo Plazo Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1675","name":"Reduced Long Term Capacity France export","name_es":"Capacidad Reducida Largo Plazo Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1676","name":"Reduced Long Term Capacity Portugal import","name_es":"Capacidad Reducida Largo Plazo Portugal sentido importador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1677","name":"Reduced Long Term Capacity Portugal export","name_es":"Capacidad Reducida Largo Plazo Portugal sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1682","name":"Not Nominated Long Term Capacity France import","name_es":"Capacidad Largo Plazo No Nominada Francia sentido importador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1683","name":"Not Nominated Long Term Capacity France export","name_es":"Capacidad Largo Plazo No Nominada Francia sentido exportador","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1684","name":"Remuneration Long term Capacity France-Spain import","name_es":"Remuneraci\u00f3n Capacidad Largo plazo Francia-Espa\u00f1a importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1685","name":"Remuneration Long term Capacity France-Spain export","name_es":"Remuneraci\u00f3n Capacidad Largo plazo Francia-Espa\u00f1a exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1686","name":"Remuneration Long term Capacity Portugal-Spain import","name_es":"Remuneraci\u00f3n Capacidad Largo plazo Portugal-Espa\u00f1a importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1687","name":"Remuneration Long term Capacity Portugal-Spain export","name_es":"Remuneraci\u00f3n Capacidad Largo plazo Portugal-Espa\u00f1a exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Auctions","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2102","name":"Congestion rents for implicit mechanisms Intraday 1 Import Francia","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 1 Francia importaci\u00f3n","description":"On date 13/06/2024, the European intraday implicit auctions were put into service. These auctions allocate exchange capacity in the FR-ES and PT-ES interconnections in a manner equivalent to the coupling of daily markets (simultaneous matching of offers for the purchase and sale of energy in the\u2026","category":"Cross-border","subcategory":"Auctions","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2103","name":"Congestion rents for implicit mechanisms Intraday 2 Import Francia","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 2 Francia importaci\u00f3n","description":"On date 13/06/2024, the European intraday implicit auctions were put into service. These auctions allocate exchange capacity in the FR-ES and PT-ES interconnections in a manner equivalent to the coupling of daily markets (simultaneous matching of offers for the purchase and sale of energy in the\u2026","category":"Cross-border","subcategory":"Auctions","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2104","name":"Congestion rents for implicit mechanisms Intraday 3 Import Francia","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 3 Francia importaci\u00f3n","description":"On date 13/06/2024, the European intraday implicit auctions were put into service. These auctions allocate exchange capacity in the FR-ES and PT-ES interconnections in a manner equivalent to the coupling of daily markets (simultaneous matching of offers for the purchase and sale of energy in the\u2026","category":"Cross-border","subcategory":"Auctions","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2105","name":"Congestion rents for implicit mechanisms Intraday 1 Export Francia","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 1 Francia exportaci\u00f3n","description":"On date 13/06/2024, the European intraday implicit auctions were put into service. These auctions allocate exchange capacity in the FR-ES and PT-ES interconnections in a manner equivalent to the coupling of daily markets (simultaneous matching of offers for the purchase and sale of energy in the\u2026","category":"Cross-border","subcategory":"Auctions","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2106","name":"Congestion rents for implicit mechanisms Intraday 2 Export Francia","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 2 Francia exportaci\u00f3n","description":"On date 13/06/2024, the European intraday implicit auctions were put into service. These auctions allocate exchange capacity in the FR-ES and PT-ES interconnections in a manner equivalent to the coupling of daily markets (simultaneous matching of offers for the purchase and sale of energy in the\u2026","category":"Cross-border","subcategory":"Auctions","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2107","name":"Congestion rents for implicit mechanisms Intraday 3 Import Francia","name_es":"Rentas de congesti\u00f3n mecanismos impl\u00edcitos intradiario 3 Francia exportaci\u00f3n","description":"On date 13/06/2024, the European intraday implicit auctions were put into service. These auctions allocate exchange capacity in the FR-ES and PT-ES interconnections in a manner equivalent to the coupling of daily markets (simultaneous matching of offers for the purchase and sale of energy in the\u2026","category":"Cross-border","subcategory":"Auctions","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"688","name":"Cross Border Balancing Import Bids submitted by Spanish electrical system","name_es":"Energ\u00eda de ofertas de balance presentadas por el SEE para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"689","name":"Cross Border Balancing Export Bid submitted by Spanish electrical system","name_es":"Energ\u00eda de ofertas de balance presentadas por el SEE para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"690","name":"French Cross Border Balancing Import Bids activated by Spanish electrical system","name_es":"Energ\u00eda de ofertas de balance presentadas por Francia para importaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"691","name":"Portuguese Cross Border Balancing Import Bids activated by Spanish electrical system","name_es":"Energ\u00eda de ofertas de balance presentadas por Portugal para importaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"692","name":"French Cross Border Balancing Export Bids for balance activated by Spanish electrical system","name_es":"Energ\u00eda de ofertas de balance presentadas por Francia para exportaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"693","name":"Portuguese Cross Border Balancing Export Bids activated by Spanish electrical system","name_es":"Energ\u00eda de ofertas de balance presentadas por Portugal para exportaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"694","name":"Spanish Cross Border Balancing Import Bids activated by France","name_es":"Energ\u00eda de ofertas de balance presentadas por el SEE para importaci\u00f3n activadas por Francia","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"695","name":"Spanish Cross Border Balancing Import Bids activated by Portugal","name_es":"Energ\u00eda de ofertas de balance presentadas por el SEE para importaci\u00f3n activadas por Portugal","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"696","name":"Spanish Cross Border Balancing Export Bids activated by France","name_es":"Energ\u00eda de ofertas de balance presentadas por el SEE para exportaci\u00f3n activadas por Francia","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"697","name":"Spanish Cross Border Balancing Export Bids activated by Portugal","name_es":"Energ\u00eda de ofertas de balance presentadas por el SEE para exportaci\u00f3n activadas por Portugal","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1138","name":"Average price of Cross Border Balancing Import Bids submitted by Spanish Electrical System","name_es":"Precio medio de ofertas de balance presentadas por el SEE para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1139","name":"Average price of Cross Border Balancing Export Bids submitted by Spanish Electrical System","name_es":"Precio medio de ofertas de balance presentadas por el SEE para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1140","name":"Average price of Cross Border Balancing Import Bids submitted by France activated by Spanish Electrical System","name_es":"Precio medio de ofertas de balance presentadas por Francia para importaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1141","name":"Average price of Cross Border Balancing Import Bids submitted by Portugal activated by Spanish Electrical System","name_es":"Precio medio de ofertas de balance presentadas por Portugal para importaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1142","name":"Average price of Cross Border Balancing Export Bids submitted by France activated by Spanish Electrical System","name_es":"Precio medio de ofertas de balance presentadas por Francia para exportaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1143","name":"Average price of Cross Border Balancing Export Bids submitted by Portugal activated by Spanish Electrical System","name_es":"Precio medio de ofertas de balance presentadas por Portugal para exportaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1144","name":"Average price of Cross Border Balancing Import Bids submitted By Spanish Electrical System activated by France","name_es":"Precio medio de ofertas de balance presentadas por el SEE para importaci\u00f3n activadas por Francia","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1145","name":"Average price of Cross Border Balancing Import Bids submitted By Spanish Electrical System activated by Portugal","name_es":"Precio medio de ofertas de balance presentadas por el SEE para importaci\u00f3n activadas por Portugal","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1146","name":"Average price of Cross Border Balancing Export Bids submitted By Spanish Electrical System activated by France","name_es":"Precio medio de ofertas de balance presentadas por el SEE para exportaci\u00f3n activadas por Francia","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1147","name":"Average price of Cross Border Balancing Export Bids submitted By Spanish Electrical System activated by Portugal","name_es":"Precio medio de ofertas de balance presentadas por el SEE para exportaci\u00f3n activadas por Portugal","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1298","name":"Cross Border Balancing Import Bids submitted by France","name_es":"Energ\u00eda de ofertas de balance presentadas por Francia para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1299","name":"Cross Border Balancing Export Bids submitted by France","name_es":"Energ\u00eda de ofertas de balance presentadas por Francia para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1300","name":"Cross Border Balancing Import Bids submitted by Portugal","name_es":"Energ\u00eda de ofertas de balance presentadas por Portugal para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1301","name":"Cross Border Balancing Export Bids submitted by Portugal","name_es":"Energ\u00eda de ofertas de balance presentadas por Portugal para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1302","name":"Average price of Cross Border Balancing Import Bids submitted by France","name_es":"Precio medio de ofertas de balance presentadas por Francia para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1303","name":"Average price of Cross Border Balancing Export Bids submitted by France","name_es":"Precio medio de ofertas de balance presentadas por Francia para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1304","name":"Average price of Cross Border Balancing Import Bids submitted by Portugal","name_es":"Precio medio de ofertas de balance presentadas por Portugal para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1305","name":"Average price of Cross Border Balancing Export Bids submitted by Portugal","name_es":"Precio medio de ofertas de balance presentadas por Portugal para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1306","name":"Maximum price of Cross Border Balancing Import Bids submitted by Spanish Electrical System","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por SEE para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1307","name":"Maximum price of Cross Border Balancing Export Bids submitted by Spanish Electrical System","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por SEE para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1308","name":"Maximum price of Cross Border Balancing Import Bids submitted by France","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por Francia para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1309","name":"Maximum price of Cross Border Balancing Export Bids submitted by France","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por Francia para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1310","name":"Maximum price of Cross Border Balancing Import Bids submitted by Portugal","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por Portugal para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1311","name":"Maximum price of Cross Border Balancing Export Bids submitted by Portugal","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por Portugal para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1312","name":"Maximum price of Cross Border Balancing Import Bids submitted By Spanish Electrical System activated by France","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por SEE para importaci\u00f3n activadas por Francia","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1313","name":"Maximum price of Cross Border Balancing Export Bids submitted By Spanish Electrical System activated by France","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por SEE para exportaci\u00f3n activadas por Francia","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1314","name":"Maximum price of Cross Border Balancing Import Bids submitted By Spanish Electrical System activated by Portugal","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por SEE para importaci\u00f3n activadas por Portugal","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1315","name":"Maximum price of Cross Border Balancing Export Bids submitted By Spanish Electrical System activated by Portugal","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por SEE para exportaci\u00f3n activadas por Portugal","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1316","name":"Maximum price of Cross Border Balancing Import Bids submitted by France activated by Spanish Electrical System","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por Francia para importaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1317","name":"Maximum price of Cross Border Balancing Export Bids submitted by France activated by Spanish Electrical System","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por Francia para exportaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1318","name":"Maximum price of Cross Border Balancing Import Bids submitted by Portugal activated by Spanish Electrical System","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por Portugal para importaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1319","name":"Maximum price of Cross Border Balancing Export Bids submitted by Portugal activated by Spanish Electrical System","name_es":"Precio m\u00e1ximo de ofertas de balance presentadas por Portugal para exportaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1320","name":"Minimum price of Cross Border Balancing Import Bids submitted by Spanish Electrical System","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por SEE para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1321","name":"Minimum price of Cross Border Balancing Export Bids submitted by Spanish Electrical System","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por SEE para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1322","name":"Minimum price of Cross Border Balancing Import Bids submitted by France","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por Francia para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1323","name":"Minimum price of Cross Border Balancing Export Bids submitted by France","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por Francia para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1324","name":"Minimum price of Cross Border Balancing Import Bids submitted by Portugal","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por Portugal para importaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1325","name":"Minimum price of Cross Border Balancing Export Bids submitted by Portugal","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por Portugal para exportaci\u00f3n","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1326","name":"Minimum price of Cross Border Balancing Import Bids submitted By Spanish Electrical System activated by France","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por SEE para importaci\u00f3n activadas por Francia","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1327","name":"Minimum price of Cross Border Balancing Export Bids submitted By Spanish Electrical System activated by France","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por SEE para exportaci\u00f3n activadas por Francia","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1328","name":"Minimum price of Cross Border Balancing Import Bids submitted By Spanish Electrical System activated by Portugal","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por SEE para importaci\u00f3n activadas por Portugal","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1329","name":"Minimum price of Cross Border Balancing Export Bids submitted By Spanish Electrical System activated by Portugal","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por SEE para exportaci\u00f3n activadas por Portugal","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1330","name":"Minimum price of Cross Border Balancing Import Bids submitted by France activated by Spanish Electrical System","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por Francia para importaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1331","name":"Minimum price of Cross Border Balancing Export Bids submitted by France activated by Spanish Electrical System","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por Francia para exportaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1332","name":"Minimum price of Cross Border Balancing Import Bids submitted by Portugal activated by Spanish Electrical System","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por Portugal para importaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1333","name":"Minimum price of Cross Border Balancing Export Bids submitted by Portugal activated by Spanish Electrical System","name_es":"Precio m\u00ednimo de ofertas de balance presentadas por Portugal para exportaci\u00f3n activadas por el SEE","description":"The cross-border balancing markets are a the mechanism managed from the BALIT platform to improve the exchange capacity use in the interconnections FR-ES and PT-ES, as well as the optimization of costs associated to the tertiary regulation and deviation management. In particular, this indicator\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1833","name":"Congestion rent balancing energies RR export Portugal","name_es":"Renta de congesti\u00f3n energ\u00edas de balance RR Portugal exportaci\u00f3n","description":"Congestion rents represent the gross income for the spanish electric system derived from the management of the international interconnection related to the activation of replacement reserves (RR). This services is regulated at european level throught the Implementation Framework RR, pursuant to\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1834","name":"Congestion rent balancing energies RR import Portugal","name_es":"Renta de congesti\u00f3n energ\u00edas de balance RR Portugal importaci\u00f3n","description":"Congestion rents represent the gross income for the spanish electric system derived from the management of the international interconnection related to the activation of replacement reserves (RR). This services is regulated at european level throught the Implementation Framework RR, pursuant to\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1835","name":"Congestion rent balancing energies RR export France","name_es":"Renta de congesti\u00f3n energ\u00edas de balance RR Francia exportaci\u00f3n","description":"Congestion rents represent the gross income for the spanish electric system derived from the management of the international interconnection related to the activation of replacement reserves (RR). This services is regulated at european level throught the Implementation Framework RR, pursuant to\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1836","name":"Congestion rent balancing energies RR import France","name_es":"Renta de congesti\u00f3n energ\u00edas de balance RR Francia importaci\u00f3n","description":"Congestion rents represent the gross income for the spanish electric system derived from the management of the international interconnection related to the activation of replacement reserves (RR). This service is regulated at european level throught the Implementation Framework RR, pursuant to\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1839","name":"In energy imported from igcc towards spanish control block","name_es":"Energ\u00eda de importaci\u00f3n intercambiada desde igcc hacia sepe","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1840","name":"In energy exported from spanish control block towards igcc","name_es":"Energ\u00eda de exportaci\u00f3n intercambiada desde SEPE hacia IGCC","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1841","name":"In spanish igcc energy settlement price","name_es":"Precio final de liquidaci\u00f3n del proceso de compensaci\u00f3n de desequilibrio igcc","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Cross-border","subcategory":"Balancing exchange","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"488","name":"NTC France import","name_es":"Capacidad de intercambio (NTC) con Francia importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"489","name":"NTC Portugal import","name_es":"Capacidad de intercambio (NTC) con Portugal importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"490","name":"NTC Morocco import","name_es":"Capacidad de intercambio (NTC) con Marruecos importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"491","name":"NTC Andorra import","name_es":"Capacidad de intercambio (NTC) con Andorra importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"492","name":"NTC France export","name_es":"Capacidad de intercambio (NTC) con Francia exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"493","name":"NTC Portugal export","name_es":"Capacidad de intercambio (NTC) con Portugal exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"494","name":"NTC Morocco export","name_es":"Capacidad de intercambio (NTC) con Marruecos exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"495","name":"NTC Andorra export","name_es":"Capacidad de intercambio (NTC) con Andorra exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"498","name":"NTC weekly forecast France import","name_es":"Capacidad de intercambio prevista (NTC) con Francia horizonte semanal importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"499","name":"NTC weekly forecast Portugal import","name_es":"Capacidad de intercambio prevista (NTC) con Portugal horizonte semanal importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"500","name":"NTC weekly forecast Morocco import","name_es":"Capacidad de intercambio prevista (NTC) con Marruecos horizonte semanal importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"501","name":"NTC weekly forecast Andorra import","name_es":"Capacidad de intercambio prevista (NTC) con Andorra horizonte semanal importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"502","name":"NTC weekly forecast France export","name_es":"Capacidad de intercambio prevista (NTC) con Francia horizonte semanal exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"503","name":"NTC weekly forecast Portugal export","name_es":"Capacidad de intercambio prevista (NTC) con Portugal horizonte semanal exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"504","name":"NTC weekly forecast Morocco export","name_es":"Capacidad de intercambio prevista (NTC) con Marruecos horizonte semanal exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"505","name":"NTC weekly forecast Andorra export","name_es":"Capacidad de intercambio prevista (NTC) con Andorra horizonte semanal exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"506","name":"ATC in Day-ahead market France import","name_es":"Capacidad de intercambio disponible (ATC) con Francia horizonte diario importaci\u00f3n","description":"Exchange capacity available after the preceding long term capacity allocation processes. The scheduling process associated is set out in O.P.3.1 In particular, this indicator refers to the exchange capacity available in the interconnection, in [MW], with France direction FR->ES before the matching\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"507","name":"ATC in Day-ahead market France export","name_es":"Capacidad de intercambio disponible (ATC) con Francia horizonte diario exportaci\u00f3n","description":"Exchange capacity available for commercial activity after the preceding long term capacity allocation processes. The scheduling process associated is set out in O.P.3.1 In particular, this indicator refers to the exchange capacity available in the interconnection, in [MW], with France direction\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"510","name":"NTC monthly forecast France import","name_es":"Capacidad de intercambio prevista (NTC) con Francia horizonte mensual importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"511","name":"NTC monthly forecast Portugal import","name_es":"Capacidad de intercambio prevista (NTC) con Portugal horizonte mensual importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"512","name":"NTC monthly forecast Morocco import","name_es":"Capacidad de intercambio prevista (NTC) con Marruecos horizonte mensual importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"513","name":"NTC monthly forecast Andorra import","name_es":"Capacidad de intercambio prevista (NTC) con Andorra horizonte mensual importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"514","name":"NTC monthly forecast France export","name_es":"Capacidad de intercambio prevista (NTC) con Francia horizonte mensual exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"515","name":"NTC monthly forecast Portugal export","name_es":"Capacidad de intercambio prevista (NTC) con Portugal horizonte mensual exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"516","name":"NTC monthly forecast Morocco export","name_es":"Capacidad de intercambio prevista (NTC) con Marruecos horizonte mensual exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"517","name":"NTC monthly forecast Andorra export","name_es":"Capacidad de intercambio prevista (NTC) con Andorra horizonte mensual exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"518","name":"NTC mobile rolling year forecast France import","name_es":"Capacidad de intercambio prevista (NTC) con Francia horizonte a\u00f1o m\u00f3vil importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"519","name":"NTC mobile rolling year forecast Portugal import","name_es":"Capacidad de intercambio prevista (NTC) con Portugal horizonte a\u00f1o m\u00f3vil importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"520","name":"NTC mobile rolling year forecast Morocco import","name_es":"Capacidad de intercambio prevista (NTC) con Marruecos horizonte a\u00f1o m\u00f3vil importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"521","name":"NTC mobile rolling year forecast Andorra import","name_es":"Capacidad de intercambio prevista (NTC) con Andorra horizonte a\u00f1o m\u00f3vil importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"522","name":"NTC mobile rolling year forecast France export","name_es":"Capacidad de intercambio prevista (NTC) con Francia horizonte a\u00f1o m\u00f3vil exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"523","name":"NTC mobile rolling year forecast Portugal export","name_es":"Capacidad de intercambio prevista (NTC) con Portugal horizonte a\u00f1o m\u00f3vil exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"524","name":"NTC mobile rolling year forecast Morocco export","name_es":"Capacidad de intercambio prevista (NTC) con Marruecos horizonte a\u00f1o m\u00f3vil exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"525","name":"NTC mobile rolling year forecast Andorra export","name_es":"Capacidad de intercambio prevista (NTC) con Andorra horizonte a\u00f1o m\u00f3vil exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1846","name":"NTC daily forecast Morocco import","name_es":"Capacidad de intercambio prevista (NTC) con Marruecos horizonte diario importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1850","name":"NTC daily forecast Morocco export","name_es":"Capacidad de intercambio prevista (NTC) con Marruecos horizonte diario exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2117","name":"NTC intradaily forecast France import","name_es":"Capacidad de intercambio comercial prevista en la interconexi\u00f3n con Francia horizonte intradiario importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2118","name":"NTC intradaily forecast France export","name_es":"Capacidad de intercambio comercial prevista en la interconexi\u00f3n con Francia horizonte intradiario exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2119","name":"NTC intradaily forecast Portugal import","name_es":"Capacidad de intercambio comercial prevista en la interconexi\u00f3n con Portugal horizonte intradiario importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2120","name":"NTC intradaily forecast Portugal export","name_es":"Capacidad de intercambio comercial prevista en la interconexi\u00f3n con Portugal horizonte intradiario exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2367","name":"NTC yearly forecast France import","name_es":"Capacidad de intercambio prevista (NTC) con Francia horizonte anual importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2368","name":"NTC yearly forecast Portugal import","name_es":"Capacidad de intercambio prevista (NTC) con Portugal horizonte anual importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2369","name":"NTC yearly forecast Morocco import","name_es":"Capacidad de intercambio prevista (NTC) con Marruecos horizonte anual importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2370","name":"NTC yearly forecast Andorra import","name_es":"Capacidad de intercambio prevista (NTC) con Andorra horizonte anual importaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2371","name":"NTC yearly forecast France export","name_es":"Capacidad de intercambio prevista (NTC) con Francia horizonte anual exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2372","name":"NTC yearly forecast Portugal export","name_es":"Capacidad de intercambio prevista (NTC) con Portugal horizonte anual exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2373","name":"NTC yearly forecast Morocco export","name_es":"Capacidad de intercambio prevista (NTC) con Marruecos horizonte anual exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2374","name":"NTC yearly forecast Andorra export","name_es":"Capacidad de intercambio prevista (NTC) con Andorra horizonte anual exportaci\u00f3n","description":"Maximum admissible of the energy exchange program value between two interconnected electrical systems compatible with the security standards and taking into account possible technical uncertainties on the future operating conditions. Capacity calculated according to the criteria established on\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10018","name":"ATC Portugal import","name_es":"Capacidad de intercambio disponible (ATC) tras la programaci\u00f3n con Portugal importaci\u00f3n","description":"Exchange capacity available for commercial activity after the preceding capacity allocation processes. Capacidad de intercambio disponible tras los procesos de asignaci\u00f3n de capacidad previos Capacity calculated according to the criteria established on O.P.3.1. The breakdown of this indicator\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10019","name":"ATC Portugal export","name_es":"Capacidad de intercambio disponible (ATC) tras la programaci\u00f3n con Portugal exportaci\u00f3n","description":"Exchange capacity available for commercial activity after the preceding capacity allocation processes. Capacity calculated according to the criteria established on O.P.3.1. The breakdown of this indicator details, in [MW] and for every hour, the import and schedules as well as the trading capacity\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10020","name":"ATC Morocco import","name_es":"Capacidad de intercambio disponible (ATC) tras la programaci\u00f3n con Marruecos importaci\u00f3n","description":"Exchange capacity available for commercial activity after the preceding capacity allocation processes. Capacity calculated according to the criteria established on O.P.3.1. The breakdown of this indicator details, in [MW] and for every hour, the import and schedules as well as the trading capacity\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10021","name":"ATC Morocco export","name_es":"Capacidad de intercambio disponible (ATC) tras la programaci\u00f3n con Marruecos exportaci\u00f3n","description":"Exchange capacity available for commercial activity after the preceding capacity allocation processes. Capacity calculated according to the criteria established on O.P.3.1. The breakdown of this indicator details, in [MW] and for every hour, the import and schedules as well as the trading capacity\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10022","name":"ATC Andorra import","name_es":"Capacidad de intercambio disponible (ATC) tras la programaci\u00f3n con Andorra importaci\u00f3n","description":"Exchange capacity available for commercial activity after the preceding capacity allocation processes. Capacity calculated according to the criteria established on O.P.3.1. The breakdown of this indicator details, in [MW] and for every hour, the import and schedules as well as the trading capacity\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10023","name":"ATC Andorra export","name_es":"Capacidad de intercambio disponible (ATC) tras la programaci\u00f3n con Andorra exportaci\u00f3n","description":"Exchange capacity available for commercial activity after the preceding capacity allocation processes. Capacity calculated according to the criteria established on O.P.3.1. The breakdown of this indicator details, in [MW] and for every hour, the import and schedules as well as the trading capacity\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10241","name":"ATC France import","name_es":"Capacidad de intercambio disponible (ATC) tras la programaci\u00f3n con Francia importaci\u00f3n","description":"Exchange capacity available for commercial activity after the preceding capacity allocation processes. Capacity calculated according to the criteria established on O.P.3.1. The breakdown of this indicator details, in [MW] and for every hour, the import and schedules as well as the trading capacity\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10242","name":"ATC France export","name_es":"Capacidad de intercambio disponible (ATC) tras la programaci\u00f3n con Francia exportaci\u00f3n","description":"Exchange capacity available for commercial activity after the preceding capacity allocation processes. Capacity calculated according to the criteria established on O.P.3.1. The breakdown of this indicator details, in [MW] and for every hour, the import and schedules as well as the trading capacity\u2026","category":"Cross-border","subcategory":"Capacity (NTC/ATC)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"496","name":"Exchange capacity authorized France import","name_es":"Capacidad de intercambio autorizada con Francia importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"497","name":"Exchange capacity authorized France export","name_es":"Capacidad de intercambio autorizada con Francia exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"533","name":"Import France commercial program","name_es":"Programa comercial en la interconexi\u00f3n con Francia importaci\u00f3n","description":"Exchange program by interconnections after market mechanisms from long term until intrady horizon. The scheduling process associated is set out on O.P.3.1. In particular it refers to the scheduled energy for every hour, in [MWh], for the border with France and direction FR->ES. Publication: Daily\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"534","name":"Export France commercial program","name_es":"Programa comercial en la interconexi\u00f3n con Francia exportaci\u00f3n","description":"Exchange program by interconnections after market mechanisms from long term until intrady horizon. The scheduling process associated is set out on O.P.3.1. In particular it refers to the scheduled energy for every hour, in [MWh], for the border with France and direction ES->FR. Publication: Daily\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"535","name":"Import France balance energy exchange program","name_es":"Programas balance transfronterizo con Francia importaci\u00f3n","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. RR energy is\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"536","name":"Export France balance energy exchange program","name_es":"Programas balance transfronterizo con Francia exportaci\u00f3n","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. RR energy is\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"537","name":"Import Portugal commercial program","name_es":"Programa comercial en la interconexi\u00f3n con Portugal importaci\u00f3n","description":"Exchange program by interconnections after market mechanisms from long term until intrady horizon. The scheduling process associated is set out on O.P.3.1. In particular it refers to the scheduled energy for every hour, in [MWh], for the border with Portugal and direction PT->ES. Publication:\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"538","name":"Import Portugal commercial program","name_es":"Programa comercial en la interconexi\u00f3n con Portugal exportaci\u00f3n","description":"Exchange program by interconnections after market mechanisms from long term until intrady horizon. The scheduling process associated is set out on O.P.3.1. In particular it refers to the scheduled energy for every hour, in [MWh], for the border with Portugal and direction ES->PT. Publication:\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"539","name":"Import Portugal balance energy exchange program","name_es":"Programas balance transfronterizo con Portugal importaci\u00f3n","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. RR energy is\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"540","name":"Export Portugal balance energy exchange program","name_es":"Programas balance transfronterizo con Portugal exportaci\u00f3n","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. RR energy is\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"556","name":"France interconnection balance real time measurements import","name_es":"Saldo horario de interconexi\u00f3n con Francia importaci\u00f3n telemedidas","description":"Real time measurements through the international interconnections. In particular, this indicator refers to the telemetrics [MWh] in the interconnection with France direction FR->ES. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"557","name":"Portugal interconnection balance real time measurements import","name_es":"Saldo horario de interconexi\u00f3n con Portugal importaci\u00f3n telemedidas","description":"Real time measurements through the international interconnections. In particular, this indicator refers to the telemetrics [MWh] in the interconnection with Portugal direction PT->ES. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"558","name":"Andorra interconnection balance real time measurements import","name_es":"Saldo horario de interconexi\u00f3n con Andorra importaci\u00f3n telemedidas","description":"Real time measurements through the international interconnections. In particular, this indicator refers to the telemetrics [MWh] in the interconnection with Andorra direction AN->ES. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"559","name":"Morocco interconnection balance real time measurements import","name_es":"Saldo horario de interconexi\u00f3n con Marruecos importaci\u00f3n telemedidas","description":"Real time measurements through the international interconnections. In particular, this indicator refers to the telemetrics [MWh] in the interconnection with Morocco direction MO->ES. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"560","name":"France interconnection balance real time measurements export","name_es":"Saldo horario de interconexi\u00f3n con Francia exportaci\u00f3n telemedidas","description":"Real time measurements through the international interconnections. In particular, this indicator refers to the telemetrics [MWh] in the interconnection with France direction ES->FR. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"561","name":"Portugal interconnection balance real time measurements export","name_es":"Saldo horario de interconexi\u00f3n con Portugal exportaci\u00f3n telemedidas","description":"Real time measurements through the international interconnections. In particular, this indicator refers to the telemetrics [MWh] in the interconnection with Portugal direction ES->PT. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"562","name":"Andorra interconnection balance real time measurements export","name_es":"Saldo horario de interconexi\u00f3n con Andorra exportaci\u00f3n telemedidas","description":"Real time measurements through the international interconnections. In particular, this indicator refers to the telemetrics [MWh] in the interconnection with Andorra direction ES->AN. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"563","name":"Morocco interconnection balance real time measurements export","name_es":"Saldo horario de interconexi\u00f3n con Marruecos exportaci\u00f3n telemedidas","description":"Real time measurements through the international interconnections. In particular, this indicator refers to the telemetrics [MWh] in the interconnection with Morocco direction MO->ES. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"564","name":"Import France countertrading program","name_es":"Programas de countertrading Francia importaci\u00f3n","description":"Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"565","name":"Export France countertrading program","name_es":"Programas de countertrading Francia exportaci\u00f3n","description":"Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"566","name":"Import Portugal countertrading program","name_es":"Programas de countertrading Portugal importaci\u00f3n","description":"Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"567","name":"Export Portugal countertrading program","name_es":"Programas de countertrading Portugal exportaci\u00f3n","description":"Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"568","name":"Net daily position Peninsular System with Portugal and France import","name_es":"Posici\u00f3n Neta diaria Sistema Peninsular con Portugal y Francia importaci\u00f3n","description":"Hourly balance of the schedules in the interconnections with France and Portugal after the daily market matching up. The scheduling process associated is set out in O.P.3.1. In particular, this indicator shows for every hour, in [MWh], the balance among schedules from day-ahead market (positive\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"569","name":"Net daily position Peninsular System with Portugal and France export","name_es":"Posici\u00f3n Neta diaria Sistema Peninsular con Portugal y Francia exportaci\u00f3n","description":"Hourly balance of the schedules in the interconnections with France and Portugal after the daily market matching up. The scheduling process associated is set out in O.P.3.1. In particular, this indicator shows for every hour, in [MWh], the balance among schedules from day-ahead market (positive\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1105","name":"Nominated capacity annual+monthly import France","name_es":"Capacidad Nominada subasta anual+mensual con Francia importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1106","name":"Nominated capacity annual+monthly export France","name_es":"Capacidad Nominada subasta anual+mensual con Francia exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1135","name":"Countertrading monthly cost (IPE +IFE)","name_es":"Coste Mensual Countertrading (IPE +IFE)","description":"Coordinated schedule established by the transmission interconnected systems operators, superimposed on the existent exchange schedules, in a magnitude and direction adequate so the net flow of exchange programs between the two electrical systems respects the existing exchange capacity value and\u2026","category":"Cross-border","subcategory":"Exchanges","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1174","name":"Measured generation Import France","name_es":"Generaci\u00f3n medida Importaci\u00f3n Francia","description":"Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with France direction FR->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1175","name":"Measured generation Import Portugal","name_es":"Generaci\u00f3n medida Importaci\u00f3n Portugal","description":"Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Portugal direction PT->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1176","name":"Measured generation Import Morocco","name_es":"Generaci\u00f3n medida Importaci\u00f3n Marruecos","description":"Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Morocco direction MA->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1177","name":"Measured generation Import Andorra","name_es":"Generaci\u00f3n medida Importaci\u00f3n Andorra","description":"Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Andorra direction AD->ES. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1178","name":"Measured generation Export France","name_es":"Generaci\u00f3n medida Exportaci\u00f3n Francia","description":"Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with France direction ES->FR. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1179","name":"Measured generation Export Portugal","name_es":"Generaci\u00f3n medida Exportaci\u00f3n Portugal","description":"Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Portugal direction ES->PT. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1180","name":"Measured generation Export Morocco","name_es":"Generaci\u00f3n medida Exportaci\u00f3n Marruecos","description":"Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Morocco direction ES->MA. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1181","name":"Measured generation Export Andorra","name_es":"Generaci\u00f3n medida Exportaci\u00f3n Andorra","description":"Measured generation in the international interconnections. In particular, this indicator refers to the measured generation in the international interconnections with Andorra direction ES->AD. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1678","name":"Compensations due to capacity reductions France-Spain import","name_es":"Compensaciones por reducciones de capacidad Francia-Espa\u00f1a importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1679","name":"Compensations due to capacity reductions France-Spain export","name_es":"Compensaciones por reducciones de capacidad Francia-Espa\u00f1a exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage the congestion of the interconnection between France and Spain. Commercial exchange capacity is auctioned in the form of Physical Capacity Rights (PTR) for each trading horizon. Clean Currently, auctions are only used in long-term\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1680","name":"Compensations due to capacity reductions Portugal-Spain import","name_es":"Compensaciones por reducciones de capacidad Portugal-Espa\u00f1a importaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1681","name":"Compensations due to capacity reductions Portugal-Spain export","name_es":"Compensaciones por reducciones de capacidad Portugal-Espa\u00f1a exportaci\u00f3n","description":"Explicit capacity auctions are a market mechanism to manage congestion in the interconnection between Portugal and Spain. Trading capacity is auctioned in the form of Financial Capacity Rights (FTRs) for each trading horizon. Currently, explicit auctions are only used in long-term horizons (i.e.:\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1824","name":"Maximum export interconnection contrallability requests in Portugal-Spain border","name_es":"Requisito m\u00e1ximo de control de flujo en Espa\u00f1a-Portugal en sentido exportador","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1825","name":"Minimum export interconnection contrallability requests in Portugal-Spain border","name_es":"Requisito m\u00ednimo de control de flujo en Espa\u00f1a-Portugal en sentido exportador","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1826","name":"Maximum import interconnection contrallability requests in Portugal-Spain border","name_es":"Requisito m\u00e1ximo de control de flujo en Espa\u00f1a-Portugal en sentido importador","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1827","name":"Minimum import interconnection contrallability requests in Portugal-Spain border","name_es":"Requisito m\u00ednimo de control de flujo en Espa\u00f1a-Portugal en sentido importador","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1828","name":"Maximum export interconnection contrallability requests in France-Spain border","name_es":"Requisito m\u00e1ximo de control de flujo en Espa\u00f1a-Francia en sentido exportador","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1829","name":"Minimum export interconnection contrallability requests in France-Spain border","name_es":"Requisito m\u00ednimo de control de flujo en Espa\u00f1a-Francia en sentido exportador","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1830","name":"Maximum import interconnection contrallability requests in France-Spain border","name_es":"Requisito m\u00e1ximo de control de flujo en Espa\u00f1a-Francia en sentido importador","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1831","name":"Minimum import interconnection contrallability requests in France-Spain border","name_es":"Requisito m\u00ednimo de control de flujo en Espa\u00f1a-Francia en sentido importador","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2068","name":"Real Time Generation export Andorra","name_es":"Generaci\u00f3n T.Real exportaci\u00f3n Andorra","description":"Export measured in real time to Andorra. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2069","name":"Real Time Generation export Morocco","name_es":"Generaci\u00f3n T.Real exportaci\u00f3n Marruecos","description":"Export measured in real time to Morocco. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2070","name":"Real Time Generation export Portugal","name_es":"Generaci\u00f3n T.Real exportaci\u00f3n Portugal","description":"Export measured in real time to Portugal. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2071","name":"Real Time Generation export France","name_es":"Generaci\u00f3n T.Real exportaci\u00f3n Francia","description":"Export measured in real time to France. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2072","name":"Real Time Generation export total","name_es":"Generaci\u00f3n T.Real exportaci\u00f3n total","description":"Total export measured in real time. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Cross-border","subcategory":"Exchanges","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2073","name":"Real Time Generation import Andorra","name_es":"Generaci\u00f3n T.Real importaci\u00f3n Andorra","description":"Import measured in real time from Andorra. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2074","name":"Real Time Generation import Morocco","name_es":"Generaci\u00f3n T.Real importaci\u00f3n Marruecos","description":"Import measured in real time from Morocco. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2075","name":"Real Time Generation import Portugal","name_es":"Generaci\u00f3n T.Real importaci\u00f3n Portugal","description":"Import measured in real time from Portugal. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2076","name":"Real Time Generation import France","name_es":"Generaci\u00f3n T.Real importaci\u00f3n Francia","description":"Import measured in real time from France. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2077","name":"Real Time Generation import total","name_es":"Generaci\u00f3n T.Real importaci\u00f3n total","description":"Total import measured in real time. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Cross-border","subcategory":"Exchanges","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10044","name":"Measured generation Portugal balance","name_es":"Generaci\u00f3n medida Saldo Portugal","description":"Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with Portugal in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10045","name":"Measured generation France balance","name_es":"Generaci\u00f3n medida Saldo Francia","description":"Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with France in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10046","name":"Measured generation Morocco balance","name_es":"Generaci\u00f3n medida Saldo Marruecos","description":"Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with Morocco in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10047","name":"Measured generation Andorra balance","name_es":"Generaci\u00f3n medida Saldo Andorra","description":"Measured generation in the international interconnections. The breakdown of this indicator provides the generation measures in the interconnection with Andorra in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10048","name":"Measured interconnections total balance interconnections","name_es":"Saldo total interconexiones medidas","description":"Sum of the international interconnection measures, each one with its corresponding sign. The breakdown of this indicator provides the detail of the measures by border and direction. It is possible also to obtain the information at province level. Publication: monthly with the measures of month M-1\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10049","name":"Total Generation + Total measured interconnections","name_es":"Total Generaci\u00f3n + Total Interconexiones medidas","description":"Sum of the international interconnection measures, each one with its corresponding sign. The breakdown of this indicator provides the detail of the generation measures for each production type and the international exchanges by border and direction. It is possible also to obtain the information at\u2026","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10207","name":"France interconnection balance real time measurements","name_es":"Saldo horario neto de interconexi\u00f3n con Francia telemedidas","description":"Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with France, each one with its sign. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10208","name":"Portugal interconnection balance real time measurements","name_es":"Saldo horario neto de interconexi\u00f3n con Portugal telemedidas","description":"Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with Portugal, each one with its sign. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10209","name":"Morocco interconnection balance real time measurements","name_es":"Saldo horario neto de interconexi\u00f3n con Marruecos telemedidas","description":"Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with Andorra, each one with its sign. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10210","name":"Andorra interconnection balance real time measurements","name_es":"Saldo horario neto de interconexi\u00f3n con Andorra telemedidas","description":"Net summation of the real time measures of the production through the international interconnections. The breakdown of this indicator provides the telemetrics [MWh] in the interconnection with Morocco, each one with its sign. Publication: hourly with the information of the previous hour.","category":"Cross-border","subcategory":"Exchanges","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10360","name":"Import balance energy exchange program","name_es":"Programas balance transfronterizo importaci\u00f3n","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. RR energy is\u2026","category":"Cross-border","subcategory":"Exchanges","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10361","name":"Export balance energy exchange program","name_es":"Programas balance transfronterizo exportaci\u00f3n","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. RR energy is\u2026","category":"Cross-border","subcategory":"Exchanges","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"545","name":"Peninsular Scheduled demand","name_es":"Demanda programada Peninsular","description":"This curve represents the scheduled production in the electricity market, in a quarter-hourly period, for generating power plants. This scheduled production is the result of day-ahead and intraday markets, in addition to the ancillary services markets managed by Red El\u00e9ctrica. For the\u2026","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"624","name":"Daily maximum real demand","name_es":"Demanda real m\u00e1ximo diario","description":"Is the maximum value of the electrical energy demand measured in real time. Data represented in this indicator refer to Peninsular data. Publication: daily with information of day D and update on day D+1.","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"625","name":"Daily minimum real demand","name_es":"Demanda real m\u00ednimo diario","description":"Is the minimum value of the electrical energy demand measured in real time. Data represented in this indicator refer to Peninsular data. Publication: daily with information of day D and update on day D+1.","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1172","name":"Measured generation Pump consumption","name_es":"Generaci\u00f3n medida Consumo bombeo","description":"Measured generation Pump consumption. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1192","name":"B.C. Demand","name_es":"Demanda en barras de central ","description":"Is the energy from the ordinary regime centrals, special regime and balance of the international exchanges measured in busbars deducted the consumptions generation and pumping. It includes losses. Publication: monthly with the information of month M-8 and previous months when new measures are\u2026","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1193","name":"Consumption demand","name_es":"Demanda en consumo","description":"Energy consumed by different clients. The consumption demand arrives at the Measurement System (SIMEL) at different times, according to the border point. The demand of clients type 1 and 2 is available in SIMEL before M+1 and the demand of clients type 3, 4 and 5 is available in month M+8.\u2026","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1194","name":"Measured demand without hourly discrimination","name_es":"Demanda medida discriminaci\u00f3n horaria Sin discriminaci\u00f3n horaria","description":"The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. In particular, this indicator refers to the consumption measures for the tariff without hourly discrimination. Publication: daily every time new measures arrive\u2026","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1195","name":"Measured demand G0 hourly discrimination HV general","name_es":"Demanda medida discriminaci\u00f3n horaria G0 GENERAL ALTA TENSI\u00d3N","description":"The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. In particular, this indicator refers to the consumption measures for the tariff general HV tariff. Publication: daily every time new measures arrive from month M+8.","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1198","name":"Measured demand E3 hourly discrimination three periods rate","name_es":"Demanda medida discriminaci\u00f3n horaria E3 TARIFA DE TRES PERIODOS","description":"The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. In particular, this indicator refers to the consumption measures for the hourly discrimination three periods. Publication: daily every time new measures arrive\u2026","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1293","name":"Peninsular real demand","name_es":"Demanda real Peninsular","description":"It shows the instantaneous value of electricity demand, which reflects seasonal and hourly peculiarities, as well as the country's activity and lifestyle. Taking into account the instantaneous balance between generation and demand, this curve is calculated based on the real-time generation and the\u2026","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1335","name":"System demand for profiles calculation","name_es":"Demanda del sistema a efectos del c\u00e1lculo de perfiles","description":"Final profile is the load profile that will be used to obtain the hourly measurement of the consumers of a certain type, from not hourly measuring records. The final profiles are calculated according to the calculation method described on the Resolution of 23 December 2015 (and correction of\u2026","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1941","name":"Total Peninsular Scheduled demand","name_es":"Demanda Programada Total Peninsular","description":"It is the result of the sum of the scheduled demand and the forecasted energy from photovoltaic self-consumption facilities that is not offered in the electricity market. Data represented in this indicator refer to peninsular data. Publication: daily at 0:00 hours with information of day D and at\u2026","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2037","name":"National real demand","name_es":"Demanda real nacional","description":"","category":"Demand","subcategory":"Demand","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2053","name":"National scheduled real demand","name_es":"Demanda real programada nacional","description":"","category":"Demand","subcategory":"Demand","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2054","name":"National Total Scheduled Demand","name_es":"Demanda Programada Total nacional","description":"","category":"Demand","subcategory":"Demand","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2065","name":"Real Time Generation national pumping consumption","name_es":"Generaci\u00f3n T.Real consumo bombeo Nacional","description":"Consumption measured in real time of the type of production by pumping at the national level. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Demand","subcategory":"Demand","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2078","name":"Real Time Generation pumping consumption","name_es":"Generaci\u00f3n T.Real consumo bombeo","description":"Pumping consumption measured in real time at the national level. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2528","name":"Final consumption profile E","name_es":"Perfil final de consumo E","description":"Consumption profiles for billing purposes under PVPC Tariff 2.0 GENERAL LOW VOLTAGE, POWER BELOW 15 kW","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2529","name":"Final consumption profile F","name_es":"Perfil final de consumo F","description":"Consumption profiles for billing purposes under PVPC Tariff 3.0 GENERAL LOW VOLTAGE, POWER ABOVE 15 kW FOR ELECTRIC VEHICLE","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2530","name":"Final consumption profile G","name_es":"Perfil final de consumo G","description":"Consumption profiles for billing purposes under PVPC Tariff 3.0 GENERAL LOW VOLTAGE, POWER ABOVE 15 kW","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10004","name":"Real demand sum of generation","name_es":"Demanda real suma de generaci\u00f3n","description":"Is the summation of the real time measure for the different production types. The breakdown of this indicator provides the MW generated by each production type measured in real time. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10267","name":"Measured demand total hourly discrimination","name_es":"Demanda medida discriminaci\u00f3n horaria total","description":"The hourly discrimination is a electricity tariff modality, where is established a different price depending on the stretch of the day. The breakdown of this indicator provides the detail of the consumption measures for each hourly discrimination tariff types Publication: daily every time new\u2026","category":"Demand","subcategory":"Demand","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"824","name":"Avoidable CO2 Wood","name_es":"CO2 evitable Madera","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the wood would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"825","name":"Avoidable CO2 Steel","name_es":"CO2 evitable Siderurgia","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the steel would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"826","name":"Avoidable CO2 Paper","name_es":"CO2 evitable Papel","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the paper would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"827","name":"Avoidable CO2 Desalination","name_es":"CO2 evitable Desalaci\u00f3n","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the desalination would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"828","name":"Avoidable CO2 Metallurgy","name_es":"CO2 evitable Metalurgia","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the metallurgy would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"829","name":"Avoidable CO2 Chemistry","name_es":"CO2 evitable Qu\u00edmica","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the chemistry would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"831","name":"Avoidable CO2 Machinery","name_es":"CO2 evitable Maquinaria","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the machinery would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"832","name":"Avoidable CO2 Glass","name_es":"CO2 evitable Vidrio","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the glass would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"833","name":"Avoidable CO2 Cement","name_es":"CO2 evitable Cemento","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the cement would be executed. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"834","name":"Avoidable CO2 Various","name_es":"CO2 evitable Varios","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of various industrial sectors. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"835","name":"Avoidable CO2","name_es":"CO2 evitable","description":"Total tonnes of CO2 that would stop being produced if a power reduction order to the interruptibility service providers of the industrial sector of the wood would be executed. This indicator can be broken down by Autonomous Regions. Publication: every 10 minutes with the information of the\u2026","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1391","name":"Carbon emission allowance price for NPT dispatch (PCO2D)","name_es":"Precio de derechos de emisi\u00f3n de despacho de los TNP (PCO2D)","description":"Carbon emission allowance price for dispatch calculated according to art. 66 RD 738/2015 Publicaci\u00f3n: monthly with the data of month M","category":"Emissions","subcategory":"CO2","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10006","name":"CO2-free generation","name_es":"Generaci\u00f3n libre de CO2","description":"Measured generation in real time whose production types do not emit CO2. The breakdown of this indicator details de MW generated in the different production types free of CO2. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10033","name":"CO2-free generation percentage","name_es":"Porcentaje de generaci\u00f3n libre de CO2","description":"Percentage of measured generation in real time whose production types do not emit CO2 compared to the total generation measured in real time. Publication: every 10 minutes.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10303","name":"Installed capacity generation total emissions","name_es":"Potencia instalada de generaci\u00f3n total con emisiones","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10304","name":"Installed capacity generation total emissions free","name_es":"Potencia instalada de generaci\u00f3n total libre de emisiones","description":"Installed capacity is defined as the maximum active power that an installation can reach. In installations with several elements in series, it will be determined as the lower power than the nominal powers of the engine, turbine or alternator groups. In installations with several elements in\u2026","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10355","name":"Real time CO2 associated generation","name_es":"CO2 Asociado Generaci\u00f3n T.Real","description":"CO2 associated to measured generation in real time. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Emissions","subcategory":"CO2","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10356","name":"Real time CO2 associated generation SNP","name_es":"CO2 Asociado Generaci\u00f3n T.Real SNP","description":"CO2 associated to measured generation in real time in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Emissions","subcategory":"CO2","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10520","name":"Statistical series estimated total generation with emissions by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n total estimada con emisiones por CCAA","description":"","category":"Emissions","subcategory":"CO2","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10522","name":"Statistical series of estimated total generation without emissions by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n total estimada sin emisiones por CCAA","description":"","category":"Emissions","subcategory":"CO2","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10578","name":"Statistical series: Total generation without emissions by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n total sin emisiones por CCAA","description":"","category":"Emissions","subcategory":"CO2","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"460","name":"Daily Peninsular Demand Forecast","name_es":"Previsi\u00f3n diaria de la demanda el\u00e9ctrica peninsular","description":"Is the consumption forecast that Red El\u00e9ctrica prepares taking into account the consumption values registered in precedent similar periods, as well as other factors with influence in the electrical consumption as the labour, the climatology and the economical activity. Important: This curve also\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"461","name":"Monthly peninsular S.O. demand forecast","name_es":"Previsi\u00f3n mensual de la demanda el\u00e9ctrica peninsular","description":"Spanish peninsular system demand forecast. In particular, this indicator shows the demand forecast for the following rolling year. Publication: monthly with the total demand information from month M+1 to M+12.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"541","name":"Peninsular wind power generation forecast","name_es":"Previsi\u00f3n de la producci\u00f3n e\u00f3lica peninsular","description":"Wind power hourly forecast according to the Wind Power Forecasting Model of the System Operator. Publication: hourly with the forecast from the current hour of day D to the last hour of day D+1.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"542","name":"Solar PV generation forecast","name_es":"Generaci\u00f3n prevista Solar fotovoltaica","description":"Hourly generation Solar PV forecast received from the Forecast Models. In particular, this indicator refers to the programming units with solar PV generation. Publication: hourly with the information of day D since hour H+1 till the final of the day and the whole day D+1.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"543","name":"Solar thermal forecast","name_es":"Generaci\u00f3n prevista Solar t\u00e9rmica","description":"Hourly generation Solar PV forecast received from the Forecast Models. In particular, this indicator refers to the forecast of solar thermal energy. Publication: hourly with the information of day D since hour H+1 till the final of the day and the whole day D+1.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"544","name":"Peninsular Forecasted demand","name_es":"Demanda prevista Peninsular","description":"This curve, calculated by Red El\u00e9ctrica using consumption values from similar preceding periods, is adjusted for seasonal and working trends, as well as for economic activity patterns. This curve does also include an estimation of consumption from self-consumption facilities. Data represented in\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"570","name":"HVDC Link forecast capacity","name_es":"Capacidad prevista en el enlace Pen\u00ednsula - Baleares","description":"Is the capacity available in the link HVDC Peninsula-Balearic for the energy exchange schedule through the link between the peninsular and Balearic electrical system. Publication: daily at around 10:30 for day D+1 and update during day D if there is a change in the forecast.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"603","name":"Weekly peninsular S.O. demand forecast","name_es":"Previsi\u00f3n semanal de la demanda el\u00e9ctrica peninsular","description":"Spanish peninsular system demand forecast. In particular, this indicator shows the demand forecast updated weekly. Publication: each Friday with the information of the week S+1 from Monday to Sunday. Updated on Sunday.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"604","name":"Monthly maximum peninsular S.O. demand forecast","name_es":"Previsi\u00f3n m\u00e1xima mensual de la demanda el\u00e9ctrica peninsular","description":"Spanish peninsular system demand forecast. In particular, this indicator shows the maximum demand forecast for each week of the following month. Publication: monthly before day 22 with the information of the following month One week belongs to a month if Monday of that week is included on this\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"619","name":"Monthly minimum peninsular S.O. demand forecast","name_es":"Previsi\u00f3n m\u00ednima mensual de la demanda el\u00e9ctrica peninsular","description":"Spanish peninsular system demand forecast. In particular, this indicator shows the minimum demand forecast for each week of the following month. Publication: monthly before day 22 with the information of the following month One week belongs to a month if Monday of that week is included on this\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"620","name":"Maximum annual peninsular S.O. demand forecast","name_es":"Previsi\u00f3n m\u00e1xima anual de la demanda el\u00e9ctrica peninsular","description":"Spanish peninsular system demand forecast. In particular, this indicator shows the maximum demand forecast for each week of the following year. Publication: yearly before the 16 December with the information of the three weeks of the next year. Will be published the weeks belonging to the year\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"621","name":"Minimum annual peninsular S.O. demand forecast","name_es":"Previsi\u00f3n m\u00ednima anual de la demanda el\u00e9ctrica peninsular","description":"Spanish peninsular system demand forecast. In particular, this indicator shows the minimum demand forecast for each week of the next year. Publication: yearly before the 16 December with the information of the three weeks of the next year. Will be published the weeks belonging to the year aaaa\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"622","name":"Margin available generation - maximum forecasted demand","name_es":"Margen generaci\u00f3n disponible - m\u00e1xima demanda prevista","description":"Subtraction of the available generation forecast minus the demand forecast for the next year. Publication: yearly before day 15 at 23:00 for year A+1.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1774","name":"Annual demand forecast","name_es":"Previsi\u00f3n demanda anual","description":"CNMC\u2019s Circular 4/2019 establishing the methodology for System Operator retribution, sets up incentives for peninsular demand forecasts quality, performed by System Operator, and establishes the forecast publication in three time horizons: annual, daily and intradaily. This indicator corresponds\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1776","name":"Demand H+3 intradaily forecast","name_es":"Previsi\u00f3n intradiaria H+3 demanda","description":"CNMC\u2019s Circular 4/2019 establishing the methodology for System Operator retribution, sets up incentives for peninsular demand forecasts quality, performed by System Operator, and establishes the forecast publication in three time horizons: annual, daily and intradaily. This indicator corresponds\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1778","name":"Wind H+3 intradaily forecast","name_es":"Previsi\u00f3n intradiaria H+3 e\u00f3lica","description":"This indicator corresponds to the peninsular intradaily wind generation forecast done by System Operator three hours before each hour. Publication: hourly for the current day.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1780","name":"Photovoltaic H+3 intradaily forecast","name_es":"Previsi\u00f3n intradiaria H+3 fotovoltaica","description":"This indicator corresponds to the peninsular intradaily photovoltaic generation forecast done by System Operator three hours before each hour. Publication: hourly for the current day.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2052","name":"National forecast actual demand","name_es":"Demanda real prevista nacional","description":"","category":"Forecasts","subcategory":"REE forecasts","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2563","name":"Daily Peninsular Market Demand Forecast","name_es":"Previsi\u00f3n diaria de la demanda el\u00e9ctrica peninsular en el mercado","description":"Is the consumption forecast that Red El\u00e9ctrica prepares taking into account the consumption values registered in precedent similar periods, as well as other factors with influence in the electrical consumption as the labour, the climatology and the economical activity. Important: This curve does\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10034","name":"Forecast generation Solar","name_es":"Generaci\u00f3n prevista Solar","description":"Hourly generation Solar PV forecast received from the Forecast Models. The breakdown of this indicator shows the forecast detail of solar thermal and solar PV energy. Publication: hourly with the information of day D since hour H+1 till the final of the day and the whole day D+1.","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10358","name":"Wind plus photovoltaic D+1 daily forecast","name_es":"Previsi\u00f3n diaria D+1 e\u00f3lica m\u00e1s fotovoltaica","description":"CNMC\u2019s Circular 4/2019 establishing the methodology for System Operator retribution, sets up incentives for peninsular wind plus photovoltaic generation forecasts quality, performed by System Operator, and establishes the forecast publication in two time horizons: daily and intradaily. This\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10359","name":"Wind plus photovoltaic H+3 intradaily forecast","name_es":"Previsi\u00f3n intradiaria H+3 e\u00f3lica m\u00e1s fotovoltaica","description":"CNMC\u2019s Circular 4/2019 establishing the methodology for System Operator retribution, sets up incentives for peninsular wind plus photovoltaic generation forecasts quality, performed by System Operator, and establishes the forecast publication in two time horizons: daily and intradaily. This\u2026","category":"Forecasts","subcategory":"REE forecasts","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"546","name":"Real time generation hydro","name_es":"Generaci\u00f3n T.Real hidr\u00e1ulica","description":"Measured generation in real time of hydraulic generation. Data represented in this indicator refer to Peninsular data. Publication: every 5 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"547","name":"Real time generation coal","name_es":"Generaci\u00f3n T.Real carb\u00f3n","description":"Measured generation in real time of coal generation. Data represented in this indicator refer to Peninsular data. Publication: every 5 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"548","name":"Real time generation fuel-gas","name_es":"Generaci\u00f3n T.Real fuel-gas","description":"Measured generation in real time of fuel and gas generation. Data represented in this indicator refer to Peninsular data. Publication: every 5 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"549","name":"Real time generation nuclear","name_es":"Generaci\u00f3n T.Real nuclear","description":"Measured generation in real time of nuclear generation. Data represented in this indicator refer to Peninsular data. Publication: every 5 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"550","name":"Real time generation C.C. GT","name_es":"Generaci\u00f3n T.Real C.Combinado","description":"Measured generation in real time of combined cycle generation. Data represented in this indicator refer to Peninsular data. Publication: every 5 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"551","name":"Real time generation wind","name_es":"Generaci\u00f3n T.Real e\u00f3lica","description":"Measured generation in real time of wind generation. Data represented in this indicator refer to Peninsular data. Publication: every 5 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"552","name":"Real time generation solar","name_es":"Generaci\u00f3n T.Real solar","description":"Measured generation in real time of solar generation. This indicator has data till 02/06/2015 at 20:50, moment from which solar generation telemetric started being recorded with photovoltaic and thermic breakdown. Data represented in this indicator refer to Peninsular data. Publication: every 5\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"553","name":"Real time generation exchanges","name_es":"Generaci\u00f3n T.Real intercambios","description":"Measured generation in real time produced as a consequence of international exchanges. Publication: every 5 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"554","name":"Real time generation HVDC Link","name_es":"Generaci\u00f3n T.Real enlace balear","description":"Measured generation in real time in the HDVC Peninsula-Balearic Link. Publication: every 5 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"555","name":"Real time generation other generation","name_es":"Resto generaci\u00f3n T.Real","description":"Measured generation in real time of thermal renewable, cogeneration and rest of non conventional generation. Data represented in this indicator refer to Peninsular data. This indicator has data till 02/06/2015 at 20:50, moment from which generation telemetrics with breakdown of the previous\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"623","name":"Weekly index of storage averaged hydraulic","name_es":"\u00cdndice de llenado medio semanal de almacenamiento hidr\u00e1ulico","description":"Weekly average filling ratio aggregated of all the water tanks and hydroelectric storage facilities (MWh) belonging to each Balance Responsible Party, during week S. Publication: weekly the third working day of each week with the information of week W-1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1150","name":"Measured hydro UGH generation","name_es":"Generaci\u00f3n medida Hidr\u00e1ulica UGH","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Hydro UGH. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1151","name":"Measured hydro non UGH generation","name_es":"Generaci\u00f3n medida Hidr\u00e1ulica no UGH","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Hydro non UGH. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1152","name":"Measured generation Turbine pumping","name_es":"Generaci\u00f3n medida Turbinaci\u00f3n bombeo","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Turbine pumping. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1153","name":"Measured nuclear generation","name_es":"Generaci\u00f3n medida Nuclear","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Nuclear. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1154","name":"Measured generation Soft coal/Anthracite","name_es":"Generaci\u00f3n medida Hulla antracita","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Soft coal/Anthracite. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1155","name":"Measured generation Sub-bituminous coal","name_es":"Generaci\u00f3n medida Hulla sub-bituminosa","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Sub-bituminous coal. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1156","name":"Measured generation Combined cycle GT","name_es":"Generaci\u00f3n medida Ciclo combinado","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Combined cycle GT. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1157","name":"Measured generation Fuel","name_es":"Generaci\u00f3n medida Fuel","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Fuel. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1158","name":"Measured generation Natural Gas - Steam turbine","name_es":"Generaci\u00f3n medida Gas Natural - Turbina de vapor","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Natural Gas pumping. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1159","name":"Measured Onshore wind generation","name_es":"Generaci\u00f3n medida E\u00f3lica terrestre","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Onshore wind. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1160","name":"Measured wind offshore generation","name_es":"Generaci\u00f3n medida E\u00f3lica marina","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Offshore wind. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1161","name":"Measured generation Solar PV","name_es":"Generaci\u00f3n medida Solar fotovoltaica","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Solar PV wind. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1162","name":"Measured generation Solar thermal","name_es":"Generaci\u00f3n medida Solar t\u00e9rmica","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Solar thermal wind. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1163","name":"Measured generation Geothermal and Ocean","name_es":"Generaci\u00f3n medida Oc\u00e9ano y geot\u00e9rmica","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation with Geothermal and Ocean. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1164","name":"Measured generation Natural Gas Cogeneration","name_es":"Generaci\u00f3n medida Gas Natural Cogeneraci\u00f3n","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Natural Gas Cogeneration pumping. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1165","name":"Measured generation Fossil Oil","name_es":"Generaci\u00f3n medida Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation depending on the production type Fossil Oil. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1166","name":"Measured generation Mining subproducts","name_es":"Generaci\u00f3n medida Subproductos miner\u00eda","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Mining subproducts. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1167","name":"Measured generation Residual energy","name_es":"Generaci\u00f3n medida Energ\u00eda residual","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Residual energy. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1168","name":"Measured generation Biomass","name_es":"Generaci\u00f3n medida Biomasa","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Biomass. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1169","name":"Measured generation Biogas","name_es":"Generaci\u00f3n medida Biog\u00e1s","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Biogas. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1170","name":"Measured generation Household and similar wastes","name_es":"Generaci\u00f3n medida Residuos dom\u00e9sticos y similares","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Household and similar wastes This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1171","name":"Measured generation Sundry waste","name_es":"Generaci\u00f3n medida Residuos varios","description":"Generation measures depending on the production type used. In particular, this indicator refers to the measured generation Sundry waste. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1182","name":"Measured generation transport network","name_es":"Generaci\u00f3n medida red de transporte","description":"Total measured generation in the transport network. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1183","name":"Measured generation distribution network","name_es":"Generaci\u00f3n medida red de distribuci\u00f3n","description":"Total measured generation in the distribution network. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1294","name":"Real time generation Solar thermal","name_es":"Generaci\u00f3n T.Real Solar t\u00e9rmica","description":"Measured generation in real time of solar thermal generation. Data represented in this indicator refer to Peninsular data. This indicator has data from 02/06/2015 at 21:00, moment from which solar generation telemetric started being recorded at this detail level. Publication: every 5 minutes with\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1295","name":"Real time generation Solar PV","name_es":"Generaci\u00f3n T.Real Solar fotovoltaica","description":"Measured generation in real time of solar PV generation. Data represented in this indicator refer to peninsular data. This indicator has data from 02/06/2015 at 21:00, moment from which solar generation telemetric started being recorded at this detail level. This indicator includes the information\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1296","name":"Real time generation Therm renewable","name_es":"Generaci\u00f3n T.Real T\u00e9rmica renovable","description":"Measured generation in real time of biogas, biomass and ocean and geothermal generation. Data represented in this indicator refer to Peninsular data. This indicator has data from 02/06/2015 at 21:00, moment from which solar generation telemetric started being recorded at this detail level.\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1297","name":"Real time generation cogeneration and rest","name_es":"Generaci\u00f3n T.Real Cogeneraci\u00f3n y resto","description":"Measured generation in real time of cogeneration and rest of non conventional generation. Data represented in this indicator refer to Peninsular data. This indicator has data from 02/06/2015 at 21:00, moment from which solar generation telemetric started being recorded at this detail level.\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2038","name":"T.Real national wind power generation","name_es":"Generaci\u00f3n T.Real e\u00f3lica nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2039","name":"National nuclear T.Real generation","name_es":"Generaci\u00f3n T.Real nuclear nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2040","name":"Generation T.Real national coal","name_es":"Generaci\u00f3n T.Real carb\u00f3n nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2041","name":"Generation T.Real national combined cycle","name_es":"Generaci\u00f3n T.Real ciclo combinado nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2042","name":"National hydraulic T.Real generation","name_es":"Generaci\u00f3n T.Real hidr\u00e1ulica nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2043","name":"Generation T.Real international exchanges national","name_es":"Generaci\u00f3n T.Real intercambios internacionales nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2044","name":"National photovoltaic solar T.Real generation","name_es":"Generaci\u00f3n T.Real solar fotovoltaica nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2045","name":"National T.Real solar thermal generation","name_es":"Generaci\u00f3n T.Real solar t\u00e9rmica nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2046","name":"National renewable thermal T.Real generation","name_es":"Generaci\u00f3n T.Real t\u00e9rmica renovable nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2047","name":"Generation T.Real domestic diesel engine","name_es":"Generaci\u00f3n T.Real motor diesel nacional","description":"","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2048","name":"Generation T.Real national gas turbine","name_es":"Generaci\u00f3n T.Real turbina de gas nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2049","name":"Generation T.Real national steam turbine","name_es":"Generaci\u00f3n T.Real turbina de vapor nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2050","name":"Generation T.Real national auxiliary generation","name_es":"Generaci\u00f3n T.Real generaci\u00f3n auxiliar nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2051","name":"Generation T.Real cogeneration and national waste","name_es":"Generaci\u00f3n T.Real cogeneraci\u00f3n y residuos nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2066","name":"Real Time Generation turbine pumping National","name_es":"Generaci\u00f3n T.Real turbinaci\u00f3n bombeo Nacional","description":"Generation measured in real time of the type of production by turbine pumping at the national level. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2067","name":"Real Time Generation hydraulic generation National","name_es":"Generaci\u00f3n T.Real generaci\u00f3n hidr\u00e1ulica Nacional","description":"Generation measured in real time of the type of hydraulic production at the national level. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2079","name":"Real Time Generation turbine pumping","name_es":"Generaci\u00f3n T.Real turbinaci\u00f3n bombeo","description":"Generaci\u00f3n medida en tiempo real del tipo de producci\u00f3n por turbinaci\u00f3n de bombeo. Publicaci\u00f3n: cada 10 minutos con la informaci\u00f3n de las tres \u00faltimas horas del d\u00eda D-1 hasta la hora actual del d\u00eda D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2080","name":"Real Time Generation hydraulic generation","name_es":"Generaci\u00f3n T.Real generaci\u00f3n hidr\u00e1ulica","description":"Generation measured in real time of the type of hydraulic production. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2166","name":"Real Time Storage Battery Charging","name_es":"Almacenamiento T.Real Carga Bater\u00edas","description":"","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2167","name":"Storage Real Time Battery Delivery","name_es":"Almacenamiento T.Real Entrega Bater\u00edas","description":"","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2198","name":"National Storage Real Time Battery Delivery","name_es":"Almacenamiento T.Real Entrega Bater\u00edas Nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2199","name":"National Storage Real Time Battery Charging","name_es":"Almacenamiento T.Real Carga Bater\u00edas Nacional","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2344","name":"Generation T.Real Steam Turbine","name_es":"Generaci\u00f3n T.Real Turbina de vapor","description":"Steam Turbine measured in real time at the national level. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2445","name":"Series statistics on total estimated generation of Hydro-wind by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Hidroe\u00f3lica por CCAA","description":"Series statistics on total estimated generation of Hydro-wind by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2446","name":"Series statistics on total estimated generation of Steam turbine by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Turbina de vapor por CCAA","description":"Series statistics on total estimated generation of Steam turbine by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2447","name":"Series statistics on total estimated generation of Gas turbine by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Turbina de gas por CCAA","description":"Series statistics on total estimated generation of Gas turbine by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2448","name":"Series statistics on total estimated generation of Diesel by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Diesel por CCAA","description":"Series statistics on total estimated generation of Diesel by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2449","name":"Series statistics on total estimated generation of Anthracite coal by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Hulla antracita por CCAA","description":"Series statistics on total estimated generation of Anthracite coal by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2450","name":"Series statistics on total estimated generation of Sub-bituminous coal by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Hulla sub-bituminosa por CCAA","description":"Series statistics on total estimated generation of Sub-bituminous coal by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2451","name":"Series statistics on total estimated generation of Fuel by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Fuel por CCAA","description":"Series statistics on total estimated generation of Fuel by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2452","name":"Series statistics on total estimated generation of Nuclear by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Nuclear por CCAA","description":"Series statistics on total estimated generation of Nuclear by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2453","name":"Series statistics on total estimated generation of Combined cycle by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Ciclo combinado por CCAA","description":"Series statistics on total estimated generation of Combined cycle by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2454","name":"Series statistics on total estimated generation of Auxiliary by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Auxiliar por CCAA","description":"Series statistics on total estimated generation of Auxiliary by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2455","name":"Series statistics on total estimated generation of Natural gas by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Gas natural por CCAA","description":"Series statistics on total estimated generation of Natural gas by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10035","name":"Measured generation Hydro","name_es":"Generaci\u00f3n medida Hidr\u00e1ulica","description":"Generation measures depending on the production type used. The breakdown of this indicator provides the generation measures of the different hydro generation types. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10036","name":"Measured generation Coal","name_es":"Generaci\u00f3n medida Carb\u00f3n","description":"Generation measures depending on the production type used. The breakdown of this indicator provides the generation measures of the different coal generation types. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10037","name":"Measured wind generation","name_es":"Generaci\u00f3n medida E\u00f3lica","description":"Generation measures depending on the production type used. The breakdown of this indicator provides the generation measures of the different wind generation types. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10038","name":"Measured generation Fuel-gas","name_es":"Generaci\u00f3n medida Fuel-gas","description":"Generation measures depending on the production type used. The breakdown of this indicator provides the generation measures of the different fuel and gas generation types. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10039","name":"Measured generation cogeneration","name_es":"Generaci\u00f3n medida cogeneraci\u00f3n","description":"Generation measures depending on the production type used. The breakdown of this indicator provides the generation measures of the different cogeneration generation types. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10040","name":"Measured generation non renewables waste","name_es":"Generaci\u00f3n medida Residuos no renovables","description":"Generation measures depending on the production type used. The breakdown of this indicator provides the generation measures of the different non renewables waste generation types. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10041","name":"Measured generation other renewables","name_es":"Generaci\u00f3n medida otras renovables","description":"Generation measures depending on the production type used. The breakdown of this indicator provides the generation measures of the different other renewables generation types. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10043","name":"Total measured generation","name_es":"Generaci\u00f3n medida total","description":"Generation measures depending on the production type used. The breakdown of this indicator provides the generation measures of the different production types, pump consumption and generation in the Balearic Link. This indicator can be broken down by provinces. Publication: daily every time that\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10062","name":"Measured generation renewables waste","name_es":"Generaci\u00f3n medida Residuos renovables","description":"Generation measures depending on the production type used. In particular, this indicator refers to the generation measures of the different renewables waste generation types. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10195","name":"Total measured generation by production type","name_es":"Generaci\u00f3n medida total tipo producci\u00f3n","description":"Generation measures depending on the production type used. The breakdown of this indicator provides the generation measures of the different generation types. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10205","name":"Measured generation solar","name_es":"Generaci\u00f3n medida solar","description":"Generation measures depending on the production type used. The breakdown of this indicator provides the generation measures of the different solar generation types in both directions. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10206","name":"Real time generation solar","name_es":"Generaci\u00f3n T.Real Solar","description":"Measured generation in real time of solar generation. The breakdown of this indicator details the energy generated as solar thermal and solar PV. This indicator has data from 02/06/2015 at 21:00, moment from which solar generation telemetric started being recorded at this detail level.\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10351","name":"Real time renewable generation","name_es":"Generaci\u00f3n T.Real renovable","description":"Measured generation in real time of renewable generation. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10352","name":"Real time non-renewable generation","name_es":"Generaci\u00f3n T.Real no renovable","description":"Measured generation in real time of non-renewable generation. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10490","name":"Percentage of non-integrated renewable energy Total","name_es":"Porcentaje de energ\u00eda renovable no integrable Total","description":"Modification of the renewable generation programme motivated by the viability of power balances. The system operator must guarantee the constant balance between the energy that is needed (demand) and that which is produced (generation), in order to supply the amount of energy and reserve required\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10491","name":"Percentage of Peninsular Renewable Generation","name_es":"Porcentaje de Generaci\u00f3n Renovable Peninsular","description":"The percentage of peninsular renewable generation corresponds to the renewable generation measurements with respect to total generation in percentage. This indicator considers the measurements of the following technologies: hydro units, hydro-wind, wind, solar photovoltaic, solar thermal, other\u2026","category":"Generation","subcategory":"By technology","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10519","name":"Statistical series: Estimated total non-renewable generation by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n total estimada No Renovable por CCAA","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10521","name":"Statistical series: Estimated total renewable energy generation by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n total estimada Renovable por CCAA","description":"","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10573","name":"Series statics on coal generation by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Carb\u00f3n por CCAA","description":"Series statistics on total estimated generation of Coal by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10574","name":"Series statics on Fuel + Gas Generation by Autonomous Community","name_es":"Serie estad\u00edstica generaci\u00f3n Fuel+Gas por CCAA","description":"Series statistics on total estimated generation of Fuel + Gas by Autonomous Community","category":"Generation","subcategory":"By technology","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"26","name":"Base Daily Operating Schedule PBF Balearic HVDC Link","name_es":"Generaci\u00f3n programada PBF Enlace Baleares","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units from Balearic HVDC link. This schedule is established\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"61","name":"Viable Daily Schedule PVP Balearic HVDC Link","name_es":"Generaci\u00f3n programada PVP Enlace Baleares","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"96","name":"Operating Hourly Program P48 Balearic HVDC Link","name_es":"Generaci\u00f3n programada P48 Enlace Baleares","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Balearic HVDC link. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"131","name":"Final Hourly Schedule PHF1 Balearic HVDC Link","name_es":"Generaci\u00f3n programada PHF1 Enlace Baleares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"166","name":"Final Hourly Schedule PHF2 Balearic HVDC Link","name_es":"Generaci\u00f3n programada PHF2 Enlace Baleares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"201","name":"Final Hourly Schedule PHF3 Balearic HVDC Link","name_es":"Generaci\u00f3n programada PHF3 Enlace Baleares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"236","name":"Final Hourly Schedule PHF4 Balearic HVDC Link","name_es":"Generaci\u00f3n programada PHF4 Enlace Baleares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"271","name":"Final Hourly Schedule PHF5 Balearic HVDC Link","name_es":"Generaci\u00f3n programada PHF5 Enlace Baleares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"306","name":"Final Hourly Schedule PHF6 Balearic HVDC Link","name_es":"Generaci\u00f3n programada PHF6 Enlace Baleares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"341","name":"Final Hourly Schedule PHF7 Balearic HVDC Link","name_es":"Generaci\u00f3n programada PHF7 Enlace Baleares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"572","name":"Hourly program for HVDC Link Peninsula-Balearic Islands","name_es":"Programas horarios en el enlace Pen\u00ednsula - Baleares sentido Pen\u00ednsula-Baleares","description":"Is the energy of the different concerned Programming Units associated to the Link HDVC Balearic Islands-Peninsula, for the energy exchange schedule through the link between the peninsular and Balearic electrical system. In particular, this indicator refers to the schedules direction\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"578","name":"Balearic TNP Price with SEPE link","name_es":"Precio TNP Balear con enlace SEPE","description":"Average price associated with category A generation in the daily schedule considering the scheduled energy exchange between the SEPE and the SEB (via the HVDC Peninsular-Balearic link). Publication: Daily from 14:20 with D+1 information.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"579","name":"Balearic TNP Price without SEPE link","name_es":"Precio TNP Balear sin enlace SEPE","description":"Average price associated with category A generation in the daily schedule without considering the scheduled energy exchange between the SEPE and the SEB (via the HVDC Peninsular-Balearic link). Publication: Daily from 14:20 with D+1 information.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1173","name":"Measured generation Balearic HVDC Link","name_es":"Generaci\u00f3n medida Enlace Baleares","description":"Measured generation Balearic HVDC Link. This indicator can be broken down by provinces. Publication: daily every time that new measures arrive from month M+1.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1339","name":"Demand in Gran Canaria","name_es":"Demanda en Gran Canaria","description":"Acquisition energy in the subsystem of Gran Canaria belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1340","name":"Demand in Lanzarote y Fuerteventura","name_es":"Demanda en Lanzarote y Fuerteventura","description":"Acquisition energy in the subsystem of Lanzarote and Fuerteventura belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1341","name":"Demand in Tenerife","name_es":"Demanda en Tenerife","description":"Acquisition energy in the subsystem of Tenerife belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1342","name":"Demand in La Palma","name_es":"Demanda en La Palma","description":"Acquisition energy in the subsystem of La Palma belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1343","name":"Demand in La Gomera","name_es":"Demanda en La Gomera","description":"Acquisition energy in the subsystem of La Gomera belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1344","name":"Demand in El Hierro","name_es":"Demanda en El Hierro","description":"Acquisition energy in the subsystem of El Hierro belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1345","name":"Demand in Mallorca - Menorca","name_es":"Demanda en Mallorca - Menorca","description":"Acquisition energy in the subsystem of Mallorca-Menorca belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1346","name":"Demand in Ibiza - Formentera","name_es":"Demanda en Ibiza - Formentera","description":"Acquisition energy in the subsystem of Ibiza-Formentera belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1347","name":"Demand in Ceuta","name_es":"Demanda en Ceuta","description":"Acquisition energy in the non-peninsular system of Ceuta. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"Ceuta-Melilla","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1348","name":"Demand in Melilla","name_es":"Demanda en Melilla","description":"Acquisition energy in the non-peninsular system of Melilla. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"Ceuta-Melilla","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1349","name":"Generation in Gran Canaria","name_es":"Generaci\u00f3n en Gran Canaria","description":"Energy generated in the Gran Canaria subsystem belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1350","name":"Generation in Lanzarote y Fuerteventura","name_es":"Generaci\u00f3n en Lanzarote y Fuerteventura","description":"Energy generated in the Lanzarote and Fuerteventura subsystem belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1351","name":"Generation in Tenerife","name_es":"Generaci\u00f3n en Tenerife","description":"Energy generated in the Tenerife subsystem belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1352","name":"Generation in La Palma","name_es":"Generaci\u00f3n en La Palma","description":"Energy generated in the subsystem of La Palma belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1353","name":"Generation in La Gomera","name_es":"Generaci\u00f3n en La Gomera","description":"Energy generated in the subsystem of La Gomera belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1354","name":"Generation in El Hierro","name_es":"Generaci\u00f3n en El Hierro","description":"Energy generated in the subsystem of El Hierro belonging to the non-peninsular system of Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1355","name":"Generation in Mallorca - Menorca","name_es":"Generaci\u00f3n en Mallorca - Menorca","description":"Energy generated in the Mallorca-Menorca subsystem belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1356","name":"Generation in Ibiza - Formentera","name_es":"Generaci\u00f3n en Ibiza - Formentera","description":"Energy generated in the subsystem of Ibiza-Formentera belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1357","name":"Generation in Ceuta","name_es":"Generaci\u00f3n en Ceuta","description":"Energy generated in the non-peninsular system of Ceuta. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"Ceuta-Melilla","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1358","name":"Generation in Melilla","name_es":"Generaci\u00f3n en Melilla","description":"Energy generated in the non-peninsular system of Melilla. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"Ceuta-Melilla","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1425","name":"Final Hourly Schedule PHFC Balearic HVDC Link","name_es":"Generaci\u00f3n programada PHFC Enlace Baleares","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1690","name":"Demand in the Balearic Electric System","name_es":"Demanda en Sistema El\u00e9ctrico Balear","description":"Acquisition energy in the unique subsystem of Balearic Islands belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1691","name":"Generation in the Balearic Electric System","name_es":"Generaci\u00f3n en Sistema El\u00e9ctrico Balear ","description":"Energy generated in the unique subsystem of Balearic Islands belonging to the non-peninsular system of Balearic Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1740","name":"Real demand for non-peninsular territories","name_es":"Demanda real territorios no peninsulares","description":"It shows the instantaneous value of electricity demand, which reflects seasonal and hourly peculiarities, as well as the country's activity and lifestyle. Taking into account the instantaneous balance between generation and demand, this curve is calculated based on the real-time generation and the\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1741","name":"Scheduled demand for non-peninsular territories","name_es":"Demanda programada territorios no peninsulares","description":"This curve represents the scheduled production in the electricity market, in a quarter-hourly period, for generating power plants. This scheduled production is the result of day-ahead and intraday markets, in addition to the ancillary services markets managed by Red El\u00e9ctrica. For the\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1742","name":"Forecasted demand for non-peninsular territories","name_es":"Demanda prevista territorios no peninsulares","description":"This curve, calculated by Red El\u00e9ctrica using consumption values from similar preceding periods, is adjusted for seasonal and working trends, as well as for economic activity patterns. This curve does also include an estimation of consumption from self-consumption facilities. Data represented in\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1743","name":"Real Time Generation diesel engines NPS","name_es":"Generaci\u00f3n T.Real motores di\u00e9sel SNP","description":"Measured generation in real time of the production type diesel engines in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1744","name":"Real Time Generation gas turbine NPS","name_es":"Generaci\u00f3n T.Real turbina de gas SNP","description":"Measured generation in real time of the production type gas turbine in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1745","name":"Real Time Generation wind NPS","name_es":"Generaci\u00f3n T.Real e\u00f3lica SNP","description":"Measured generation in real time of the production type wind in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1746","name":"Real Time Generation combined cycle NPS","name_es":"Generaci\u00f3n T.Real ciclo combinado SNP","description":"Measured generation in real time of the production type combined cycle in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1747","name":"Real Time Generation steam turbine NPS","name_es":"Generaci\u00f3n T.Real turbina de vapor SNP","description":"Measured generation in real time of the production type steam turbine in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1748","name":"Real Time Generation solar PV for non-peninsular territories","name_es":"Generaci\u00f3n t.real solar fotovoltaica territorios no peninsulares","description":"Measured generation in real time of the production type solar PV in non-peninsular systems. This indicator includes the information of photovoltaic self-consumption. Publication: every 5 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1749","name":"Real Time Generation hydraulic NPS","name_es":"Generaci\u00f3n T.Real hidr\u00e1ulica SNP","description":"Measured generation in real time of the production type hydraulic in non-peninsular system. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1750","name":"Real Time Generation coal NPS","name_es":"Generaci\u00f3n T.Real carb\u00f3n SNP","description":"Measured generation in real time of the production type coal in non-peninsular system. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1751","name":"Real Time Generation HDVC link NPS","name_es":"Generaci\u00f3n T.Real enlace balear SNP","description":"Measured generation in real time in the HDVC Peninsula-Balearic Link NPS. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1752","name":"Real Time Generation other renewable energies NPS","name_es":"Generaci\u00f3n T.Real otras renovables SNP","description":"Measured generation in real time of the production type other renewable energies NPS. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1753","name":"Real Time Generation waste NPS","name_es":"Generaci\u00f3n T.Real residuos SNP","description":"Measured generation in real time of the production type waste in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1754","name":"Real Time Generation auxiliary generation NPS","name_es":"Generaci\u00f3n T.Real generaci\u00f3n auxiliar SNP","description":"Measured generation in real time of the production type auxiliary generation in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1755","name":"Real Time Generation cogeneration NPS","name_es":"Generaci\u00f3n T.Real cogeneraci\u00f3n SNP","description":"Measured generation in real time of the production type cogeneration in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1820","name":"Real Time Generation Ibiza-Formentera link NPS","name_es":"Generaci\u00f3n T.Real enlace Ibiza-Formentera SNP","description":"Measured generation in real time in the Ibiza-Formentera Link NPS. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1821","name":"Real Time Generation Mallorca-Menorca link NPS","name_es":"Generaci\u00f3n T.Real enlace Mallorca-Menorca SNP","description":"Measured generation in real time in the Mallorca-Menorca Link NPS. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1822","name":"Real Time Generation Mallorca-Ibiza link NPS","name_es":"Generaci\u00f3n T.Real enlace Mallorca-Ibiza SNP","description":"Measured generation in real time in the Mallorca-Ibiza Link NPS. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1933","name":"Fuel diesel oil NPT dispatch product price","name_es":"Precio de producto del combustible diesel oil para despacho de los TNP","description":"Fuel diesel oil dispatch product price. Delivery: monthly with the data of month M","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1934","name":"Fuel fuel 0.3% NPT dispatch product price","name_es":"Precio de producto del combustible fuel 0.3% para despacho de los TNP","description":"Fuel fuel 0.3% dispatch product price. Delivery: monthly with the data of month M","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1935","name":"Fuel fuel 0.73% NPT dispatch product price","name_es":"Precio de producto del combustible fuel 0.73% para despacho de los TNP","description":"Fuel fuel 0.73% dispatch product price. Delivery: monthly with the data of month M","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1936","name":"Coal NPT dispatch product price","name_es":"Precio de producto combustible carb\u00f3n Baleares","description":"Coal dispatch product price. Delivery: monthly with the data of month M.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1938","name":"Fuel gasoleo NPT dispatch product price","name_es":"Precios de producto del combustible gasoleo para despacho de los TNP","description":"Fuel gasoleo dispatch product price. Delivery: monthly with the data of month M","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1939","name":"Fuel fuel 1% NPT dispatch product price","name_es":"Precios de producto del combustible fuel 1% para despacho de los TNP","description":"Fuel fuel 1% dispatch product price. Delivery: monthly with the data of month M","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1940","name":"Natural Gas NPT dispatch product price","name_es":"Precio de producto del combustible Gas Natural para despacho de los TNP","description":"Natural Gas dispatch product price. Delivery: monthly with the data of month M","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1942","name":"Total Scheduled demand for non-peninsular territories","name_es":"Demanda Programada total territorios no peninsulares","description":"it is the result of the sum of the scheduled demand and the forecasted energy from photovoltaic self-consumption facilities that is not offered in the electricity market. Data represented in this indicator refer to non-peninsular data. Publicaci\u00f3n: daily at 0:00 hours with information of day D and\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2081","name":"Real Time Generation pumping consumption for non-peninsular systems","name_es":"Generaci\u00f3n T.Real consumo bombeo para sistemas no peninsulares","description":"Consumption measured in real time of the type of production by pumping in non-peninsular systems. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2082","name":"Real Time Generation turbine pumping for non-peninsular systems","name_es":"Generaci\u00f3n T.Real turbinaci\u00f3n bombeo para sistemas no peninsulares","description":"Generation measured in real time of the type of production by turbine pumping in non-peninsular systems. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2083","name":"Real Time Generation hydraulic generation for non-peninsular systems","name_es":"Generaci\u00f3n T.Real generaci\u00f3n hidr\u00e1ulica para sistemas no peninsulares","description":"Generation measured in real time of the type of hydraulic production in non-peninsular systems. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2084","name":"T.Real Generation Lanzarote-Fuerteventura link for non-peninsular systems","name_es":"Generaci\u00f3n T.Real enlace Lanzarote-Fuerteventura para sistemas no peninsulares","description":"Generation measured in real time in the link Lanzarote-Fuerteventura in non-peninsular systems. Publication: every 10 minutes with information from the last three hours of day D-1 to the current time of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2085","name":"T.Real generation of non-renewable waste for non-peninsular systems","name_es":"Generaci\u00f3n T.Real residuos no renovables para sistemas no peninsulares","description":"","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2086","name":"T.Real renewable waste generation for non-peninsular systems","name_es":"Generaci\u00f3n T.Real residuos renovables para sistemas no peninsulares","description":"","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2168","name":"Storage Real Time Battery Charging for non-peninsular systems","name_es":"Almacenamiento T.Real Carga Bater\u00edas para los sistemas no peninsulares","description":"","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2169","name":"Storage Real Time Battery Delivery for non-peninsular systems","name_es":"Almacenamiento T.Real Entrega Bater\u00edas para los sistemas no peninsulares","description":"","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2200","name":"Renewable Energy Not Integrable due to technical restrictions in real time RTT SNP","name_es":"Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas en tiempo real RTT SNP","description":"El proceso de soluci\u00f3n de restricciones t\u00e9cnicas en tiempo real es realizado por el Operador del sistema y consiste en la soluci\u00f3n de las restricciones t\u00e9cnicas identificadas durante la operaci\u00f3n en tiempo real mediante la modificaci\u00f3n de los programas de las unidades de programaci\u00f3n. Este\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2201","name":"Renewable Energy Not Integrable due to technical restrictions in real time Balance SNP","name_es":"Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas en tiempo real Balance SNP","description":"El proceso de soluci\u00f3n de restricciones t\u00e9cnicas en tiempo real es realizado por el Operador del sistema y consiste en la soluci\u00f3n de las restricciones t\u00e9cnicas identificadas durante la operaci\u00f3n en tiempo real mediante la modificaci\u00f3n de los programas de las unidades de programaci\u00f3n. Este\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2202","name":"Renewable Energy Not Integrable due to technical restrictions in real time Total SNP","name_es":"Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas en tiempo real Total SNP","description":"El proceso de soluci\u00f3n de restricciones t\u00e9cnicas en tiempo real es realizado por el Operador del sistema y consiste en la soluci\u00f3n de las restricciones t\u00e9cnicas identificadas durante la operaci\u00f3n en tiempo real mediante la modificaci\u00f3n de los programas de las unidades de programaci\u00f3n. Este\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2276","name":"Renewable Energy Not Integrable due to technical restrictions in real time Total SNP","name_es":"Energ\u00eda Renovable No Integrable por restricciones t\u00e9cnicas en tiempo real Total SNP","description":"El proceso de soluci\u00f3n de restricciones t\u00e9cnicas en tiempo real es realizado por el Operador del sistema y consiste en la soluci\u00f3n de las restricciones t\u00e9cnicas identificadas durante la operaci\u00f3n en tiempo real mediante la modificaci\u00f3n de los programas de las unidades de programaci\u00f3n. Este\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2509","name":"Real-Time Power Generation Tenerife \u2013 La Gomera Interconnection","name_es":"Generaci\u00f3n T.Real enlace Tenerife - La Gomera","description":"Real-time power generation of the Tenerife \u2013 La Gomera interconnection","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2515","name":"Demand in Tenerife\u2013La Gomera","name_es":"Demanda en Tenerife\u2013La Gomera","description":"Energy acquisition in the Tenerife\u2013La Gomera subsystem belonging to the Canary Islands non-peninsular system. Publication: daily at 7:45 with data from D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2518","name":"Generation in Tenerife\u2013La Gomera","name_es":"Generaci\u00f3n en Tenerife\u2013La Gomera","description":"Energy generated in the Tenerife\u2013La Gomera subsystem belonging to the Canary Islands non-peninsular system. Publication: daily at 7:45 with data from D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2583","name":"10 ppm automotive diesel fuel NPT dispatch product price","name_es":"Precio de producto del combustible gas\u00f3leo automoci\u00f3n 10 ppm para despacho de los TNP","description":"10 ppm automotive diesel fuel NPT dispatch product price. Publication: monthly with the data of month M.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10024","name":"Operating Hourly Program Generation + storage + Balearic HVDC Link P48","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares P48","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown will show the energy scheduled by all types of generation units, pump consumption and Balearic HVDC Link. Publication: every hour at around minute 15\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10220","name":"Base Daily Operating Schedule generation + storage + Balearic HVDC Link PBF","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares PBF","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10221","name":"Final Hourly Schedule generation + storage + Balearic HVDC Link PHF1","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares PHF1","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10222","name":"Final Hourly Schedule generation + storage + Balearic HVDC Link PHF2","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares PHF2","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10223","name":"Final Hourly Schedule generation + storage + Balearic HVDC Link PHF3","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares PHF3","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10224","name":"Final Hourly Schedule generation + storage + Balearic HVDC Link PHF4","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares PHF4","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10225","name":"Final Hourly Schedule generation + storage + Balearic HVDC Link PHF5","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares PHF5","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10226","name":"Final Hourly Schedule generation + storage + Balearic HVDC Link PHF6","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares PHF6","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10227","name":"Final Hourly Schedule generation + storage + Balearic HVDC Link PHF7","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares PHF7","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10228","name":"Viable Daily Schedule generation + storage + Balearic HVDC Link PVP","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares PVP","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10243","name":"Demand in Canary islands","name_es":"Demanda en Canarias","description":"Acquisition energy in the non-peninsular system of Canary Islands. Its breakdown provides the energy demanded in the different subsystems of the Canary Islands. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10244","name":"Demand in Balearic islands","name_es":"Demanda en Baleares","description":"Acquisition energy in the non-peninsular system of Balearic Islands. The breakdown of this indicator provides the detail of the demand in the different Balearic subsystems. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10245","name":"Demand in NPS","name_es":"Demanda en los SNP","description":"Acquisition energy in the non-peninsular systems. The breakdown of this indicator provides the detail of the demand in the different non-peninsular subsystems. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10246","name":"Generation in Canary islands","name_es":"Generaci\u00f3n en Canarias","description":"Energy generated in the non-peninsular system of Canary Islands. The breakdown of this indicator provides the detail of the demand in the different non-peninsular subsystems. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10247","name":"Generation in Balearic islands","name_es":"Generaci\u00f3n en Baleares","description":"Energy generated in the non-peninsular system of Balearic islands. The breakdown of this indicator provides the detail of the demand in the different Balearic subsystems. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10248","name":"Generation in NPS","name_es":"Generaci\u00f3n en los SNP","description":"Energy generated in the non-peninsular systems. This indicator by default provides the generation detail in each non-peninsular subsystem. Publication: daily at around 7:45 with the data of day D-2.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10286","name":"Final Hourly Schedule generation + storage + Balearic HVDC Link PHFC","name_es":"Generaci\u00f3n programada + Almacenamiento + Cable Baleares PHFC","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10350","name":"Real demand sum of generation NPS","name_es":"Demanda real suma de generaci\u00f3n SNP","description":"Is the summation of the real time measure for the different production types in non-peninsular systems. The breakdown of this indicator provides the MW generated by each production type measured in real time. Publication: every 10 minutes with the information of the previous 10 minutes.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10353","name":"Real Time Renewable Generation NPS","name_es":"Generaci\u00f3n T.Real renovable SNP","description":"Measured generation in real time of the production type renewable in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10354","name":"Real Time Non-Renewable Generation NPS","name_es":"Generaci\u00f3n T.Real no renovable SNP","description":"Measured generation in real time of the production type non-renewable in non-peninsular systems. Publication: every 10 minutes with the information of the last three hours of day D-1 till the current hour of day D.","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10488","name":"Percentage of non-integrated renewable energy by RRTT SNP","name_es":"Porcentaje de energ\u00eda renovable no integrable por RRTT SNP","description":"Modification of the renewable generation programme motivated by Technical Restrictions. A technical restriction is any circumstance or incident derived from the situation of the electrical system that affects the conditions of security, quality and reliability of supply established in the\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10489","name":"Percentage of renewable energy not integrated by SNP Balance","name_es":"Porcentaje de energ\u00eda renovable no integrable por Balance SNP","description":"Modification of the renewable generation programme motivated by the viability of power balances. The system operator must guarantee the constant balance between the energy that is needed (demand) and that which is produced (generation), in order to supply the amount of energy and reserve required\u2026","category":"Non-peninsular (SNP)","subcategory":"System","area":"SNP-islands","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"463","name":"Unavailable power at closure","name_es":"Potencia indisponible de generaci\u00f3n en el cierre","description":"Total amount of unavaliabilities of active power of the generation Physical Units which affect the hourly periods of day D. Publication: on day D+1 once the daily scheduling horizon of day D has finished.","category":"Other","subcategory":"Other","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1012","name":"Final annual energy","name_es":"Energ\u00eda anual final","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is\u2026","category":"Other","subcategory":"Other","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1037","name":"Monthly expenses balance (GMB)","name_es":"Gastos mensuales de balance (GMB)","description":"Monthly amount resulting from the secondary band markets settlement, tertiary regulation, Replacement Reserves (RR) and secondary use. Publication: monthly before day 28 at 12:00 hours for month M-3.","category":"Other","subcategory":"Other","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10057","name":"Total energy production market","name_es":"Energ\u00eda total mercado de producci\u00f3n","description":"Total volume of the energy managed in the electrical energy production markets. The breakdown of this indicator details the energy allocated in the SPOT Daily and Intraday markets, tertiary regulation, secondary use, Replacement Reserves (RR), technical constraints phase I, upwards and downwards.\u2026","category":"Other","subcategory":"Other","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10323","name":"Balance energy upward","name_es":"Energ\u00eda de balance a subir","description":"The secondary regulation is a complementary service of a facultative nature, which aims to maintain the balance generation-demand, correcting any deviation regarding the exchange schedules forecasted in the interconnection Spain-France and the frequency imbalances. This service is remunerated\u2026","category":"Other","subcategory":"Other","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10324","name":"Balance energy downward","name_es":"Energ\u00eda de balance a bajar","description":"The secondary regulation is a complementary service of a facultative nature, which aims to maintain the balance generation-demand, correcting any deviation regarding the exchange schedules forecasted in the interconnection Spain-France and the frequency imbalances. This service is remunerated\u2026","category":"Other","subcategory":"Other","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10325","name":"Total allocated energy for security and balance","name_es":"Energ\u00eda total asignada por seguridad y de balance","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Other","subcategory":"Other","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"602","name":"Energy Allocated in Day Ahead Market","name_es":"Energ\u00eda asignada en Mercado SPOT Diario Espa\u00f1a","description":"The Daily Market is the integral mechanism of the electrical energy production market that aims to carry out the transactions of electrical energy for the next day, through the presentation of electricity power sale and purchase bids by the balance responsible parties of the Daily Market. The\u2026","category":"Prices & markets","subcategory":"Day-ahead","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1334","name":"Allocated energy Day Ahead Market","name_es":"Energ\u00eda asignada en Mercado SPOT Diario Francia","description":"The Daily Market is the integral mechanism of the electrical energy production market that aims to carry out the transactions of electrical energy for the next day, through the presentation of electricity power sale and purchase bids by the balance responsible parties of the Daily Market. Within\u2026","category":"Prices & markets","subcategory":"Day-ahead","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"605","name":"Energy Allocated in Intraday Market session 1","name_es":"Energ\u00eda asignada en Mercado SPOT Intradiario sesi\u00f3n 1","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"606","name":"Energy Allocated in Intraday Market session 2","name_es":"Energ\u00eda asignada en Mercado SPOT Intradiario sesi\u00f3n 2","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"607","name":"Energy Allocated in Intraday Market session 3","name_es":"Energ\u00eda asignada en Mercado SPOT Intradiario sesi\u00f3n 3","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"608","name":"Energy Allocated in Intraday Market session 4","name_es":"Energ\u00eda asignada en Mercado SPOT Intradiario sesi\u00f3n 4","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"609","name":"Energy Allocated in Intraday Market session 5","name_es":"Energ\u00eda asignada en Mercado SPOT Intradiario sesi\u00f3n 5","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"610","name":"Energy Allocated in Intraday Market session 6","name_es":"Energ\u00eda asignada en Mercado SPOT Intradiario sesi\u00f3n 6","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"611","name":"Energy Allocated in Intraday Market session 7","name_es":"Energ\u00eda asignada en Mercado SPOT Intradiario sesi\u00f3n 7","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"612","name":"Marginal price Intraday market session 1","name_es":"Precio mercado SPOT Intradiario Sesi\u00f3n 1","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"613","name":"Marginal price Intraday market session 2","name_es":"Precio mercado SPOT Intradiario Sesi\u00f3n 2","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"614","name":"Marginal price Intraday market session 3","name_es":"Precio mercado SPOT Intradiario Sesi\u00f3n 3","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"615","name":"Marginal price Intraday market session 4","name_es":"Precio mercado SPOT Intradiario Sesi\u00f3n 4","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"616","name":"Marginal price Intraday market session 5","name_es":"Precio mercado SPOT Intradiario Sesi\u00f3n 5","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"617","name":"Marginal price Intraday market session 6","name_es":"Precio mercado SPOT Intradiario Sesi\u00f3n 6","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"618","name":"Marginal price Intraday market session 7","name_es":"Precio mercado SPOT Intradiario Sesi\u00f3n 7","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1442","name":"Energy Allocated in Continuous Intraday Market","name_es":"Energ\u00eda asignada en Mercado Intradiario Continuo","description":"Mechanism integrant the production market of electrical energy which aims to deal with, through the presentation of electricity power sale and purchase bids by the market parties, the necessary adjustments on the Daily Viable Schedule traded in the Continuous Intraday Market. The breakdown of this\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1727","name":"Reference price in Continuous Intraday Market","name_es":"Precio de referencia en Mercado Intradiario Continuo","description":"Reference price of the European Continuous Intraday Market in the Spanish area calculated as the weighted average for each hour, in \u20ac/MWh, of all the transactions made in the Continuous Intraday Market in which a purchase or sale of the Spanish market area intervenes. The breakdown of this\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10050","name":"Energy Allocated in Intraday Market","name_es":"Energ\u00eda asignada en Mercado SPOT Intradiario","description":"Mechanism that is part of the electrical energy production market that aims to address, through the presentation of offers for the sale and acquisition of electrical energy by the subjects of the daily market, the necessary adjustments to the viable daily program. The 6 sessions of MIBEL intraday\u2026","category":"Prices & markets","subcategory":"Intraday","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"573","name":"Average price of demand in SEIE by system","name_es":"Precio medio de la demanda en los SNP por sistema","description":"Weighted average price of power purchase of non-peninsular systems. This indicator by default provides the detail of the demand price of each non-peninsular system. Publication: daily at around 7:45 with the data of day D-2.","category":"Prices & markets","subcategory":"Other prices","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"574","name":"Average price of generation in SEIE by system","name_es":"Precio medio de la generaci\u00f3n en los SNP por sistema","description":"Weighted average price of energy generation of the non-peninsular systems. This indicator by default provides the detail of the generation price in each non-peninsular system. Publication: daily at around 7:45 with the data of day D-2.","category":"Prices & markets","subcategory":"Other prices","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"817","name":"Quarter-hourly average price final","name_es":"Precio medio cuarto horario final","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the weighted average quarter-hourly price of energy for all types of consumers. For dates prior to January 1, 2026, the resolution\u2026","category":"Prices & markets","subcategory":"Other prices","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"895","name":"Monthly average price final","name_es":"Precio medio mensual final","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy monthly weighted\u2026","category":"Prices & markets","subcategory":"Other prices","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"973","name":"Annual average price final","name_es":"Precio medio anual final","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy annual weighted\u2026","category":"Prices & markets","subcategory":"Other prices","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1336","name":"Average price of demand in SEIE by subsystem","name_es":"Precio medio de la demanda en los SNP por subsistema","description":"Weighted average price of power purchase of non-peninsular subsystems. This indicator by default provides the detail of the demand price of each non-peninsular subsystem. Publication: daily at around 7:45 with the data of day D-2.","category":"Prices & markets","subcategory":"Other prices","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1337","name":"Average price of generation in SEIE by subsystem","name_es":"Precio medio de la generaci\u00f3n en los SNP por subsistema","description":"Weighted average price of energy generation of the non-peninsular subsystem. This indicator by default provides the detail of the generation price in each non-peninsular subsystem. Publication: daily at around 7:45 with the data of day D-2.","category":"Prices & markets","subcategory":"Other prices","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10380","name":"Quarter-hourly average price OS processes","name_es":"Precio medio cuarto horario componente procesos OS","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of OS processes within the weighted average quarter-hourly energy price for all types of consumers. For dates prior\u2026","category":"Prices & markets","subcategory":"Other prices","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10523","name":"Quarter-hourly average price amount participation services","name_es":"Precio medio cuarto horario componente importe participaci\u00f3n servicios","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of amount participation services within the weighted average quarter-hourly energy price for all types of consumers.\u2026","category":"Prices & markets","subcategory":"Other prices","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"71","name":"Operating Hourly Program P48 Hydro UGH","name_es":"Generaci\u00f3n programada P48 Hidr\u00e1ulica UGH","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hydro UGH generation. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"72","name":"Operating Hourly Program P48 Hydro non UGH","name_es":"Generaci\u00f3n programada P48 Hidr\u00e1ulica no UGH","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hydro non UGH generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"73","name":"Operating Hourly Program P48 Turbine pumping","name_es":"Generaci\u00f3n programada P48 Turbinaci\u00f3n bombeo","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Turbine pumping generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"74","name":"Operating Hourly Program P48 Nuclear","name_es":"Generaci\u00f3n programada P48 Nuclear","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Nuclear generation. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"75","name":"Operating Hourly Program P48 Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada P48 Hulla antracita Anexo II RD 134/2010","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Soft coal/Anthracite generation Annex II RD 134/2010. Publication: every hour at around minute 15\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"76","name":"Operating Hourly Program P48 Sub-bituminous coal RD 134/2010","name_es":"Generaci\u00f3n programada P48 Hulla sub-bituminosa Anexo II RD 134/2010","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Sub-bituminous coal generation Annex II RD 134/2010. Publication: every hour at around minute 15\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"77","name":"Operating Hourly Program P48 Soft coal/Anthracite","name_es":"Generaci\u00f3n programada P48 Hulla antracita","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Soft coal/Anthracite generation. Publication: every hour at around minute 15 with the information\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"78","name":"Operating Hourly Program P48 Sub-bituminous coal","name_es":"Generaci\u00f3n programada P48 Hulla sub-bituminosa","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Sub-bituminous coal generation. Publication: every hour at around minute 15 with the information of\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"79","name":"Operating Hourly Program P48 Combined cycle GT","name_es":"Generaci\u00f3n programada P48 Ciclo combinado","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Combined cycle generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"80","name":"Operating Hourly Program P48 Fuel","name_es":"Generaci\u00f3n programada P48 Fuel","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Fuel generation. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"81","name":"Operating Hourly Program P48 Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada P48 Gas Natural - Turbina de vapor","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Natural Gas generation. Publication: every hour at around minute 15 with the information of day D.\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"82","name":"Operating Hourly Program P48 Onshore wind","name_es":"Generaci\u00f3n programada P48 E\u00f3lica terrestre","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Onshore wind generation. Publication: every hour at around minute 15 with the information of day D.\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"83","name":"Operating Hourly Program P48 Offshore wind","name_es":"Generaci\u00f3n programada P48 E\u00f3lica marina","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Offshore wind generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"84","name":"Operating Hourly Program P48 Solar PV","name_es":"Generaci\u00f3n programada P48 Solar fotovoltaica","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Solar PV generation. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"85","name":"Operating Hourly Program P48 Solar thermal","name_es":"Generaci\u00f3n programada P48 Solar t\u00e9rmica","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Solar thermal generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"86","name":"Operating Hourly Program P48 Geothermal and Ocean","name_es":"Generaci\u00f3n programada P48 Oc\u00e9ano y geot\u00e9rmica","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Geothermal and Ocean generation. Publication: every hour at around minute 15 with the information\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"87","name":"Operating Hourly Program P48 Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada P48 Gas Natural Cogeneraci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Natural Gas Cogeneration generation. Publication: every hour at around minute 15 with the\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"88","name":"Operating Hourly Program P48 Fossil Oil","name_es":"Generaci\u00f3n programada P48 Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Natural fossil oil generation. Publication: every hour at around minute 15 with the information of\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"89","name":"Operating Hourly Program P48 Mining subproducts","name_es":"Generaci\u00f3n programada P48 Subproductos miner\u00eda","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Mining subproducts generation. Publication: every hour at around minute 15 with the information of\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"90","name":"Operating Hourly Program P48 Residual energy","name_es":"Generaci\u00f3n programada P48 Energ\u00eda residual","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Residual energy generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"91","name":"Operating Hourly Program P48 Biomass","name_es":"Generaci\u00f3n programada P48 Biomasa","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Biomass generation. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"92","name":"Operating Hourly Program P48 Biogas","name_es":"Generaci\u00f3n programada P48 Biog\u00e1s","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Biogas generation. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"93","name":"Operating Hourly Program P48 Household and similar wastes","name_es":"Generaci\u00f3n programada P48 Residuos dom\u00e9sticos y similares","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Household and similar wastes generation. Publication: every hour at around minute 15 with the\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"94","name":"Operating Hourly Program P48 Sundry waste","name_es":"Generaci\u00f3n programada P48 Residuos varios","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Sundry waste generation. Publication: every hour at around minute 15 with the information of day D.\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"95","name":"Operating Hourly Program P48 Pump consumption","name_es":"Generaci\u00f3n programada P48 Consumo bombeo","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Pump consumption generation. Publication: every hour at around minute 15 with the information of\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"97","name":"Operating Hourly Program P48 Generic","name_es":"Generaci\u00f3n programada P48 Gen\u00e9ricas","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the generic programming units. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"98","name":"Operating Hourly Program P48 Import France","name_es":"Generaci\u00f3n programada P48 Importaci\u00f3n Francia","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from France import. Publication: every hour at around minute 15 with the information of day D. At around\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"99","name":"Operating Hourly Program P48 Import Portugal","name_es":"Generaci\u00f3n programada P48 Importaci\u00f3n Portugal","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Portugal import. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"100","name":"Operating Hourly Program P48 Import Morocco","name_es":"Generaci\u00f3n programada P48 Importaci\u00f3n Marruecos","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Morocco import. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"101","name":"Operating Hourly Program P48 Import Andorra","name_es":"Generaci\u00f3n programada P48 Importaci\u00f3n Andorra","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Andorra import. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"102","name":"Operating Hourly Program P48 Export France","name_es":"Generaci\u00f3n programada P48 Exportaci\u00f3n Francia","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from France export. Publication: every hour at around minute 15 with the information of day D. At around\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"103","name":"Operating Hourly Program P48 Export Portugal","name_es":"Generaci\u00f3n programada P48 Exportaci\u00f3n Portugal","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Portugal export. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"104","name":"Operating Hourly Program P48 Export Morocco","name_es":"Generaci\u00f3n programada P48 Exportaci\u00f3n Marruecos","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Morocco export. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"105","name":"Operating Hourly Program P48 Export Andorra","name_es":"Generaci\u00f3n programada P48 Exportaci\u00f3n Andorra","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from Andorra export. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"367","name":"Scheduled demand P48 Market direct consumption","name_es":"Demanda programada P48 Consumos directos en mercado","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Market direct consumption programming units. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"368","name":"Scheduled demand P48 Aux. Svcs. Consumption","name_es":"Demanda programada P48 Consumo de Servicios Auxiliares","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Auxiliary Services Consumption programming units. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"369","name":"Scheduled demand P48 Wind adjustment","name_es":"Demanda programada P48 Correcci\u00f3n e\u00f3lica","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Wind adjustment programming units, which is the balance between programmed generation of the wind units and its telemetry\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"370","name":"Scheduled demand P48 Solar adjustment","name_es":"Demanda programada P48 Correcci\u00f3n solar","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the balance between the scheduled generation of the solar PV units and its telemetry in real-time. It only has values for the\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"371","name":"Scheduled demand P48 REE adjustment","name_es":"Demanda programada P48 Correcci\u00f3n REE","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator is the demand adjustment in real time, it only has values for the P48. Publication: every hour at around minute 15 with the information\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2131","name":"Scheduled Generation P48 Hybridization","name_es":"Generaci\u00f3n programada P48 Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2443","name":"Scheduled demand P48 RE programs correction","name_es":"Demanda programada P48 Correcci\u00f3n RE programas","description":"P48 scheduled demand - correction related to RE programs. Publication: daily.","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2444","name":"Program adjustment P48 generation","name_es":"Ajuste de programas P48 generaci\u00f3n","description":"P48 program adjustment related to generation. Publication: daily.","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10008","name":"Operating Hourly Program P48 Coal","name_es":"Generaci\u00f3n programada P48 Carb\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the scheduled energy by Coal generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the update is\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10009","name":"Operating Hourly Program P48 Fuel-Gas","name_es":"Generaci\u00f3n programada P48 Fuel-Gas","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the scheduled energy by Fuel-Gas generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the update\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10010","name":"Operating Hourly Program P48 Wind","name_es":"Generaci\u00f3n programada P48 E\u00f3lica","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by the Wind generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the update\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10011","name":"Operating Hourly Program P48 Cogeneration","name_es":"Generaci\u00f3n programada P48 Cogeneraci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by the Cogeneration generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10012","name":"Operating Hourly Program P48 non renewables waste","name_es":"Generaci\u00f3n programada P48 Residuos no renovables","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by Non renewables waste generation. Publication: every hour at around minute 15 with the information of day D. At around\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10013","name":"Operating Hourly Program P48 Other renewables","name_es":"Generaci\u00f3n programada P48 otras renovables","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by Other renewables generation. Publication: every hour at around minute 15 with the information of day D. At around 05:00\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10016","name":"Operating Hourly Program P48 Morocco balance","name_es":"Generaci\u00f3n programada P48 Saldo Marruecos","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the balance resulting from the interconnection with Morocco. Its breakdown shows the export and import scheduled energy for\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10017","name":"Operating Hourly Program P48 Andorra balance","name_es":"Generaci\u00f3n programada P48 Saldo Andorra","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the balance resulting from the interconnection with Andorra. Its breakdown shows the export and import scheduled energy for\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10025","name":"P48 adjustment","name_es":"Ajuste de programas p48","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. The breakdown of this indicator shows the energy scheduled for the concepts Wind adjustment and Solar PV adjustment. It only has values for P48. Publication: every\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10026","name":"Operating hourly program P48 total balance interconnections","name_es":"Saldo total interconexiones programa p48","description":"Net summation of the real time measures of the production through the international interconnections. The scheduling process associated is set out on O.P.3.1 The breakdown shows the balance, in [MWh], amonog the export and import scheduled energy for all the interconnections with Spain for every\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10027","name":"Total scheduled demand P48","name_es":"Demanda programada P48 total","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown will show the energy scheduled of all supply of demand. Publication: every hour at around minute 15 with the information of day D. At around 05:00 the\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10042","name":"Total Generation + Total P48 scheduled interconnections","name_es":"Total Generaci\u00f3n + Total Interconexiones programada p48","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled for the different generation types as well as the imports and exports between the interconnections with Spain. Publication:\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10061","name":"Operating Hourly Program P48 Coal RD 134/2010","name_es":"Generaci\u00f3n programada P48 Anexo II RD 134/2010","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled by production type of the programming units in the Annex II RD 134/2010. Publication: every hour at around minute 15 with the\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10063","name":"Operating Hourly Program P48 UGH + non UGH","name_es":"Generaci\u00f3n programada P48 UGH + no UGH","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled in the hydraulic production types UGH + non UGH. Publication: every hour at around minute 15 with the information of day D.\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10237","name":"Operating Hourly Program P48 Import Total","name_es":"Generaci\u00f3n programada P48 Importaci\u00f3n Total","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from international import. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10238","name":"Operating Hourly Program P48 Export Total","name_es":"Generaci\u00f3n programada P48 Exportaci\u00f3n Total","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units from international export. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10257","name":"Total Operating Hourly Program Generation","name_es":"Generaci\u00f3n programada P48 total","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. Its breakdown shows the energy scheduled for the different generation production types. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10464","name":"Total program storage p48","name_es":"Almacenamiento total programa p48","description":"","category":"Schedules","subcategory":"P48 (operating)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1","name":"Base Daily Operating Schedule PBF Hydro UGH","name_es":"Generaci\u00f3n programada PBF Hidr\u00e1ulica UGH","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Hydro UGH generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2","name":"Base Daily Operating Schedule PBF Hydro non UGH","name_es":"Generaci\u00f3n programada PBF Hidr\u00e1ulica no UGH","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Hydro non UGH generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"3","name":"Base Daily Operating Schedule PBF Turbine pumping","name_es":"Generaci\u00f3n programada PBF Turbinaci\u00f3n bombeo","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Turbine pumping generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"4","name":"Base Daily Operating Schedule PBF Nuclear","name_es":"Generaci\u00f3n programada PBF Nuclear","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with nuclear generation. This schedule is established\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"5","name":"Base Daily Operating Schedule PBF Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PBF Hulla antracita Anexo II RD 134/2010","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Soft coal/Anthracite generation Annex II RD\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"6","name":"Base Daily Operating Schedule PBF Sub-bituminous coal Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PBF Hulla sub-bituminosa Anexo II RD 134/2010","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Sub-bituminous coal generation Annex II RD\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"7","name":"Base Daily Operating Schedule PBF Soft coal/Anthracite","name_es":"Generaci\u00f3n programada PBF Hulla antracita","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Soft coal/Anthracite generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"8","name":"Base Daily Operating Schedule PBF Sub-bituminous coal","name_es":"Generaci\u00f3n programada PBF Hulla sub-bituminosa","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Sub-bituminous coal generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"9","name":"Base Daily Operating Schedule PBF Combined cycle GT","name_es":"Generaci\u00f3n programada PBF Ciclo combinado","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with combined cycle generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10","name":"Base Daily Operating Schedule PBF Fuel","name_es":"Generaci\u00f3n programada PBF Fuel","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with fuel generation. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"11","name":"Base Daily Operating Schedule PBF Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada PBF Gas Natural - Turbina de vapor","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with natural gas generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"12","name":"Base Daily Operating Schedule PBF Onshore wind","name_es":"Generaci\u00f3n programada PBF E\u00f3lica terrestre","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with onshore wind generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"13","name":"Base Daily Operating Schedule PBF Offshore wind","name_es":"Generaci\u00f3n programada PBF E\u00f3lica marina","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with offshore wind generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"14","name":"Base Daily Operating Schedule PBF Solar PV","name_es":"Generaci\u00f3n programada PBF Solar fotovoltaica","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with solar PV generation. This schedule is established\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"15","name":"Base Daily Operating Schedule PBF Solar thermal","name_es":"Generaci\u00f3n programada PBF Solar t\u00e9rmica","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with solar thermal generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"16","name":"Base Daily Operating Schedule PBF Geothermal and Ocean","name_es":"Generaci\u00f3n programada PBF Oc\u00e9ano y geot\u00e9rmica","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with geothermal and ocean generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"17","name":"Base Daily Operating Schedule PBF Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada PBF Gas Natural Cogeneraci\u00f3n","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with natural gas cogeneration generation. This\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"18","name":"Base Daily Operating Schedule PBF Fossil Oil","name_es":"Generaci\u00f3n programada PBF Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with natural fossil oil generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"19","name":"Base Daily Operating Schedule PBF Mining subproducts","name_es":"Generaci\u00f3n programada PBF Subproductos miner\u00eda","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with mining subproducts generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"20","name":"Base Daily Operating Schedule PBF Residual energy","name_es":"Generaci\u00f3n programada PBF Energ\u00eda residual","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with residual energy generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"21","name":"Base Daily Operating Schedule PBF Biomass","name_es":"Generaci\u00f3n programada PBF Biomasa","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with biomass generation. This schedule is established\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"22","name":"Base Daily Operating Schedule PBF Biogas","name_es":"Generaci\u00f3n programada PBF Biog\u00e1s","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with biogas generation. This schedule is established\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"23","name":"Base Daily Operating Schedule PBF Household and similar wastes","name_es":"Generaci\u00f3n programada PBF Residuos dom\u00e9sticos y similares","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with household and similar wastes generation. This\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"24","name":"Base Daily Operating Schedule PBF Sundry waste","name_es":"Generaci\u00f3n programada PBF Residuos varios","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with sundry waste generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"25","name":"Base Daily Operating Schedule PBF Pump consumption","name_es":"Generaci\u00f3n programada PBF Consumo bombeo","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with pump consumption generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"27","name":"Base Daily Operating Schedule PBF Generic","name_es":"Generaci\u00f3n programada PBF Gen\u00e9ricas","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with generic type. This schedule is established by the\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"28","name":"Base Daily Operating Schedule PBF Import France","name_es":"Generaci\u00f3n programada PBF Importaci\u00f3n Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units from France import. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"29","name":"Base Daily Operating Schedule PBF Import Portugal","name_es":"Generaci\u00f3n programada PBF Importaci\u00f3n Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units from Portugal import. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"30","name":"Base Daily Operating Schedule PBF Import Morocco","name_es":"Generaci\u00f3n programada PBF Importaci\u00f3n Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units from Morocco import. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"31","name":"Base Daily Operating Schedule PBF Import Andorra","name_es":"Generaci\u00f3n programada PBF Importaci\u00f3n Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units from Andorra import. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"32","name":"Base Daily Operating Schedule PBF Export France","name_es":"Generaci\u00f3n programada PBF Exportaci\u00f3n Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units from France export. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"33","name":"Base Daily Operating Schedule PBF Export Portugal","name_es":"Generaci\u00f3n programada PBF Exportaci\u00f3n Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units from Portugal export. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"34","name":"Base Daily Operating Schedule PBF Export Morocco","name_es":"Generaci\u00f3n programada PBF Exportaci\u00f3n Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units from Morocco export. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"35","name":"Base Daily Operating Schedule PBF Export Andorra","name_es":"Generaci\u00f3n programada PBF Exportaci\u00f3n Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units from Andorra export. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"353","name":"Scheduled demand PBF Market direct consumption","name_es":"Demanda programada PBF Consumos directos en mercado","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Market direct consumption programming units. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"354","name":"Scheduled demand PBF Aux. Svcs. Consumption","name_es":"Demanda programada PBF Consumo de Servicios Auxiliares","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Auxiliary Services Consumption programming units. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"355","name":"Scheduled demand PBF Wind adjustment","name_es":"Demanda programada PBF Correcci\u00f3n e\u00f3lica","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"356","name":"Scheduled demand PBF Solar adjustment","name_es":"Demanda programada PBF Correcci\u00f3n solar","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"357","name":"Scheduled demand PBF REE adjustment","name_es":"Demanda programada PBF Correcci\u00f3n REE","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"421","name":"Hydro UGH PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Hidr\u00e1ulica UGH","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Hydro UGH generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"422","name":"Hydro non UGH PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Hidr\u00e1ulica no UGH","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Hydro non UGH generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"423","name":"Turbine pumping PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Turbinaci\u00f3n bombeo","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Turbine pumping generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"424","name":"Nuclear PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Nuclear","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Nuclear generation. This schedule is established\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"425","name":"Soft coal/Anthracite RD 134/2010 PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Hulla antracita Anexo II RD 134/2010","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Soft coal/Anthracite generation Annex II RD\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"426","name":"Sub-bituminous coal RD 134/2010 PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Hulla sub-bituminosa Anexo II RD 134/2010","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Sub-bituminous coal generation Annex II RD\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"427","name":"Soft coal/Anthracite PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Hulla antracita","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Soft coal/Anthracite generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"428","name":"Sub-bituminous coal PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Hulla sub-bituminosa","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Sub-bituminous coal generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"429","name":"PBF Combined cycle GT PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Ciclo combinado","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Combined cycle generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"430","name":"Fuel PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Fuel","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Fuel generation. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"431","name":"Natural Gas PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Gas Natural","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Natural Gas generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"432","name":"Onshore wind PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF E\u00f3lica terrestre","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Onshore wind generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"433","name":"Offshore wind PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF E\u00f3lica marina","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Offshore wind generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"434","name":"Solar PV PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Solar fotovoltaica","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with solar PV generation. This schedule is established\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"435","name":"Solar thermal PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Solar t\u00e9rmica","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Solar thermal generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"436","name":"Geothermal and Ocean PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Oc\u00e9ano y geot\u00e9rmica","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Geothermal and Ocean generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"437","name":"Natural Gas Cogeneration PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Gas Natural Cogeneraci\u00f3n","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Natural Gas Cogeneration generation. This\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"438","name":"Fossil Oil PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Natural fossil oil generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"439","name":"Mining subproducts PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Subproductos miner\u00eda","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Mining subproducts generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"440","name":"Residual energy PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Energ\u00eda residual","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Residual energy generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"441","name":"Biomass PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Biomasa","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Biomass generation. This schedule is established\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"442","name":"Biogas PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Biog\u00e1s","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Biogas generation. This schedule is established\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"443","name":"Household and similar wastes PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Residuos dom\u00e9sticos y similares","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Household and similar wastes generation. This\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"444","name":"Sundry waste PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Residuos varios","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Sundry waste generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"445","name":"Pump consumption PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Consumo bombeo","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Pump consumption generation. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"446","name":"Import France PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Importaci\u00f3n Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Import France programming units. This schedule is established by the SO\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"447","name":"Import Portugal PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Importaci\u00f3n Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Import Portugal programming units. This schedule is established by the\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"448","name":"Import Morocco PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Importaci\u00f3n Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Import Morocco programming units. This schedule is established by the SO\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"449","name":"Import Andorra PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Importaci\u00f3n Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Import Andorra programming units. This schedule is established by the SO\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"450","name":"Export France PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Exportaci\u00f3n Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Export France programming units. This schedule is established by the SO\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"451","name":"Export Portugal PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Exportaci\u00f3n Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Export Portugal programming units. This schedule is established by the\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"452","name":"Export Morocco PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Exportaci\u00f3n Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Export Morocco programming units. This schedule is established by the SO\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"453","name":"Export Andorra PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Exportaci\u00f3n Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Export Andorra programming units. This schedule is established by the SO\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"454","name":"Competitive supplier sales PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Comercializaci\u00f3n Mercado Libre ventas","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units type Competitive supplier sales. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"455","name":"Generic purchases PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Gen\u00e9ricas ventas","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Generic purchases programming units. This schedule is established by the\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"456","name":"Competitive supplier downward PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Comercializaci\u00f3n Mercado Libre bajar","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Competitive supplier down programming units. This schedule is\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"458","name":"Direct consumer PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Consumo Directo en Mercado","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Direct Consumer programming units. This schedule is established by the\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"459","name":"Generic downward PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Gen\u00e9ricas bajar","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Generic down programming units. This schedule is established by the SO\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"462","name":"Unavailable power at PDBF","name_es":"Potencia indisponible de generaci\u00f3n en PBF","description":"Total amount of unavaliabilities of active power of the generation Physical Units declared by the Balance Responsible Parties until the moment of publishing the Base Daily Operating Schedule which have affected the hourly periods of day D+1. Publication: on day D once published the daily schedule.","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"701","name":"PDBF Technical Constraints Market Energy Allocated Phase I upward","name_es":"Energ\u00eda asignada restricciones t\u00e9cnicas diario Fase I subir","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"702","name":"PDBF Technical Constraints Market Energy Allocated Phase I downward","name_es":"Energ\u00eda asignada restricciones t\u00e9cnicas diario Fase I bajar","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"703","name":"PDBF Technical Constraints Market Energy Allocated Phase II upward","name_es":"Energ\u00eda asignada restricciones t\u00e9cnicas diario Fase II subir","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"704","name":"PDBF Technical Constraints Market Energy Allocated Phase II downward","name_es":"Energ\u00eda asignada restricciones t\u00e9cnicas diario Fase II bajar","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"705","name":"Average price of solution of PBF technical constrainst phase I upward","name_es":"Precio medio restricciones t\u00e9cnicas diario Fase I subir","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"706","name":"Average price of solution of PBF technical constrainst phase I downward","name_es":"Precio medio restricciones t\u00e9cnicas diario Fase I bajar","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"707","name":"Average price of solution of PBF technical constrainst phase II upward","name_es":"Precio medio restricciones t\u00e9cnicas diario Fase II subir","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"708","name":"Average price of solution of PBF technical constrainst phase II downward","name_es":"Precio medio restricciones t\u00e9cnicas diario Fase II bajar","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"710","name":"PDBF technical constrainst unitary cost supported by the demand","name_es":"Coste unitario soportado por demanda de soluci\u00f3n de Restricciones t\u00e9cnicas diario","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1790","name":"PDBF Technical constraints market energy allocated phase I upward SCB","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Subir SCB","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Units and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1791","name":"PDBF Technical constraints market energy allocated phase I downward SCB","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Bajar SCB","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Units and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1792","name":"PDBF Technical constraints market energy allocated phase I upward SCA","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Subir SCA","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1793","name":"PDBF Technical constraints market energy allocated phase I downward SCA","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Bajar SCA","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1794","name":"PDBF Technical constraints market energy allocated phase I upward CT","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Subir CT","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1795","name":"PDBF Technical constraints market energy allocated phase I downward CT","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Bajar CT","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1796","name":"PDBF Technical constraints market energy allocated phase I upward RTD","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Subir RTD","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1797","name":"PDBF Technical constraints market energy allocated phase I downward RTD","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Bajar RTD","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1800","name":"PDBF Technical constraints market energy allocated phase I upward Others","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Subir Otros","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1801","name":"PDBF Technical constraints market energy allocated phase I downward Others","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Bajar Otros","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2132","name":"Scheduled Generation PBF Hybridization","name_es":"Generaci\u00f3n programada PBF Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2142","name":"Bilateral PBF Hybridization Program","name_es":"Programa bilateral PBF Hibridaci\u00f3n","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Coal generation. To see the composition of this\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2352","name":"PDBF Technical constraints market energy allocated phase I upward RSI","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Subir RSI","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Units and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2353","name":"PDBF Technical constraints market energy allocated phase I downward RSI","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Bajar RSI","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Units and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10051","name":"PDBF Technical Constraints Market Energy Allocated Phase I","name_es":"Energ\u00eda asignada restricciones t\u00e9cnicas diario Fase I","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Units\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10064","name":"Base Daily Operating Schedule PBF UGH + non UGH","name_es":"Generaci\u00f3n programada PBF UGH + no UGH","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10073","name":"Base Daily Operating Schedule PBF Wind","name_es":"Generaci\u00f3n programada PBF E\u00f3lica","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10074","name":"Base Daily Operating Schedule PBF Other renewables","name_es":"Generaci\u00f3n programada PBF otras renovables","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10075","name":"Base Daily Operating Schedule PBF Annex II RD 134/2010","name_es":"Generaci\u00f3n programada PBF Anexo II RD 134/2010","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electric system. Its breakdown shows the energy scheduled by production type of the programming units in the Annex II RD 134/2010. This\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10077","name":"Base Daily Operating Schedule PBF Fuel-Gas","name_es":"Generaci\u00f3n programada PBF Fuel-Gas","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with fuel and gas generation. To see the composition\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10086","name":"Base Daily Operating Schedule PBF Cogeneration","name_es":"Generaci\u00f3n programada PBF Cogeneraci\u00f3n","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10095","name":"Base Daily Operating Schedule PBF Waste","name_es":"Generaci\u00f3n programada PBF Residuos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10122","name":"Base Daily Operating Schedule PBF Morocco balance","name_es":"Generaci\u00f3n programada PBF Saldo Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10131","name":"Base Daily Operating Schedule PBF Andorra balance","name_es":"Generaci\u00f3n programada PBF Saldo Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the balance resulting from the imports and exports with Andorra. To see the\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10141","name":"Scheduled demand PBF total","name_es":"Demanda programada PBF total","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. Its breakdown will show the PBF demand by types of offer associated to the demand. This schedule is established by\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10167","name":"Base Daily Operating Schedule PBF Coal","name_es":"Generaci\u00f3n programada PBF Carb\u00f3n","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10196","name":"PBF adjustment","name_es":"Ajuste de programas PBF","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10233","name":"Coal PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Carb\u00f3n","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Coal generation. To see the composition of this\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10234","name":"Other renewables PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Otras renovables","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the programming units with Other renewables generation. To see the\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10235","name":"Total Sales PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Total Ventas","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Total Sales programming units. To see the composition of this indicator\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10236","name":"Total Purchases PBF energy traded on bilateral contract","name_es":"Programa bilateral PBF Total Compras","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Total Purchases programming units. To see the composition of this\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10258","name":"Total Base Daily Operating Schedule PBF Generation","name_es":"Generaci\u00f3n programada PBF total","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10270","name":"PDBF Technical Constraints Market Energy Allocated Phase II","name_es":"Energ\u00eda asignada restricciones t\u00e9cnicas diario Fase II","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Units\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10326","name":"Weighted average price of solution of PBF technical constrainst upward","name_es":"Precio medio ponderado restricciones t\u00e9cnicas diario subir","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10327","name":"Weighted Average price of solution of PBF technical constrainst downward","name_es":"Precio medio ponderado restricciones t\u00e9cnicas diario bajar","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10362","name":"PDBF Technical constraints market energy allocated phase I Absolute volume SCB","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Absoluto SCB","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Units and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10363","name":"PDBF Technical constraints market energy allocated phase I Absolute volume SCA","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Absoluto SCA","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10364","name":"PDBF Technical constraints market energy allocated phase I Absolute volume CT","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Absoluto CT","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10365","name":"PDBF Technical constraints market energy allocated phase I Absolute volume RTD","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Absoluto RTD","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10367","name":"PDBF Technical constraints market energy allocated phase I Absolute volume Others","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Absoluto Otros","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Unties and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10518","name":"PDBF Technical constraints market energy allocated phase I Absolute volume RSI","name_es":"Energ\u00eda asignada por restricciones t\u00e9cnicas diario Fase I Absoluto RSI","description":"The technical constraints solution process PDBF is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule through the modification of the schedules of the Programming Units and subsequent rebalancing\u2026","category":"Schedules","subcategory":"PBF (day-ahead base)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"106","name":"Final Hourly Schedule PHF1 Hydro UGH","name_es":"Generaci\u00f3n programada PHF1 Hidr\u00e1ulica UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"107","name":"Final Hourly Schedule PHF1 Hydro non UGH","name_es":"Generaci\u00f3n programada PHF1 Hidr\u00e1ulica no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"108","name":"Final Hourly Schedule PHF1 Turbine pumping","name_es":"Generaci\u00f3n programada PHF1 Turbinaci\u00f3n bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"109","name":"Final Hourly Schedule PHF1 Nuclear","name_es":"Generaci\u00f3n programada PHF1 Nuclear","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"110","name":"Final Hourly Schedule PHF1 Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF1 Hulla antracita Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"111","name":"Final Hourly Schedule PHF1 Sub-bituminous coal Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF1 Hulla sub-bituminosa Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"112","name":"Final Hourly Schedule PHF1 Soft coal/Anthracite","name_es":"Generaci\u00f3n programada PHF1 Hulla antracita","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"113","name":"Final Hourly Schedule PHF1 Sub-bituminous coal","name_es":"Generaci\u00f3n programada PHF1 Hulla sub-bituminosa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"114","name":"Final Hourly Schedule PHF1 Combined cycle GT","name_es":"Generaci\u00f3n programada PHF1 Ciclo combinado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"115","name":"Final Hourly Schedule PHF1 Fuel","name_es":"Generaci\u00f3n programada PHF1 Fuel","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"116","name":"Final Hourly Schedule PHF1 Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada PHF1 Gas Natural - Turbina de vapor","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"117","name":"Final Hourly Schedule PHF1 Onshore wind","name_es":"Generaci\u00f3n programada PHF1 E\u00f3lica terrestre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"118","name":"Final Hourly Schedule PHF1 Offshore wind","name_es":"Generaci\u00f3n programada PHF1 E\u00f3lica marina","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"119","name":"Final Hourly Schedule PHF1 Solar PV","name_es":"Generaci\u00f3n programada PHF1 Solar fotovoltaica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"120","name":"Final Hourly Schedule PHF1 Solar thermal","name_es":"Generaci\u00f3n programada PHF1 Solar t\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"121","name":"Final Hourly Schedule PHF1 Geothermal and Ocean","name_es":"Generaci\u00f3n programada PHF1 Oc\u00e9ano y geot\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"122","name":"Final Hourly Schedule PHF1 Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada PHF1 Gas Natural Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"123","name":"Final Hourly Schedule PHF1 Fossil Oil","name_es":"Generaci\u00f3n programada PHF1 Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"124","name":"Final Hourly Schedule PHF1 Mining subproducts","name_es":"Generaci\u00f3n programada PHF1 Subproductos miner\u00eda","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"125","name":"Final Hourly Schedule PHF1 Residual energy","name_es":"Generaci\u00f3n programada PHF1 Energ\u00eda residual","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"126","name":"Final Hourly Schedule PHF1 Biomass","name_es":"Generaci\u00f3n programada PHF1 Biomasa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"127","name":"Final Hourly Schedule PHF1 Biogas","name_es":"Generaci\u00f3n programada PHF1 Biog\u00e1s","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"128","name":"Final Hourly Schedule PHF1 Household and similar wastes","name_es":"Generaci\u00f3n programada PHF1 Residuos dom\u00e9sticos y similares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"129","name":"Final Hourly Schedule PHF1 Sundry waste","name_es":"Generaci\u00f3n programada PHF1 Residuos varios","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"130","name":"Final Hourly Schedule PHF1 Pump consumption","name_es":"Generaci\u00f3n programada PHF1 Consumo bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"132","name":"Final Hourly Schedule PHF1 Generic","name_es":"Generaci\u00f3n programada PHF1 Gen\u00e9ricas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"133","name":"Final Hourly Schedule PHF1 Import France","name_es":"Generaci\u00f3n programada PHF1 Importaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"134","name":"Final Hourly Schedule PHF1 Import Portugal","name_es":"Generaci\u00f3n programada PHF1 Importaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"135","name":"Final Hourly Schedule PHF1 Import Morocco","name_es":"Generaci\u00f3n programada PHF1 Importaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"136","name":"Final Hourly Schedule PHF1 Import Andorra","name_es":"Generaci\u00f3n programada PHF1 Importaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"137","name":"Final Hourly Schedule PHF1 Export France","name_es":"Generaci\u00f3n programada PHF1 Exportaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"138","name":"Final Hourly Schedule PHF1 Export Portugal","name_es":"Generaci\u00f3n programada PHF1 Exportaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"139","name":"Final Hourly Schedule PHF1 Export Morocco","name_es":"Generaci\u00f3n programada PHF1 Exportaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"140","name":"Final Hourly Schedule PHF1 Export Andorra","name_es":"Generaci\u00f3n programada PHF1 Exportaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"141","name":"Final Hourly Schedule PHF2 Hydro UGH","name_es":"Generaci\u00f3n programada PHF2 Hidr\u00e1ulica UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"142","name":"Final Hourly Schedule PHF2 Hydro non UGH","name_es":"Generaci\u00f3n programada PHF2 Hidr\u00e1ulica no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"143","name":"Final Hourly Schedule PHF2 Turbine pumping","name_es":"Generaci\u00f3n programada PHF2 Turbinaci\u00f3n bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"144","name":"Final Hourly Schedule PHF2 Nuclear","name_es":"Generaci\u00f3n programada PHF2 Nuclear","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"145","name":"Final Hourly Schedule PHF2 Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF2 Hulla antracita Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"146","name":"Final Hourly Schedule PHF2 Sub-bituminous coal Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF2 Hulla sub-bituminosa Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"147","name":"Final Hourly Schedule PHF2 Soft coal/Anthracite","name_es":"Generaci\u00f3n programada PHF2 Hulla antracita","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"148","name":"Final Hourly Schedule PHF2 Sub-bituminous coal","name_es":"Generaci\u00f3n programada PHF2 Hulla sub-bituminosa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"149","name":"Final Hourly Schedule PHF2 Combined cycle GT","name_es":"Generaci\u00f3n programada PHF2 Ciclo combinado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"150","name":"Final Hourly Schedule PHF2 Fuel","name_es":"Generaci\u00f3n programada PHF2 Fuel","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"151","name":"Final Hourly Schedule PHF2 Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada PHF2 Gas Natural - Turbina de vapor","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"152","name":"Final Hourly Schedule PHF2 Onshore wind","name_es":"Generaci\u00f3n programada PHF2 E\u00f3lica terrestre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"153","name":"Final Hourly Schedule PHF2 Offshore wind","name_es":"Generaci\u00f3n programada PHF2 E\u00f3lica marina","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"154","name":"Final Hourly Schedule PHF2 Solar PV","name_es":"Generaci\u00f3n programada PHF2 Solar fotovoltaica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"155","name":"Final Hourly Schedule PHF2 Solar thermal","name_es":"Generaci\u00f3n programada PHF2 Solar t\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"156","name":"Final Hourly Schedule PHF2 Geothermal and Ocean","name_es":"Generaci\u00f3n programada PHF2 Oc\u00e9ano y geot\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"157","name":"Final Hourly Schedule PHF2 Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada PHF2 Gas Natural Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"158","name":"Final Hourly Schedule PHF2 Fossil Oil","name_es":"Generaci\u00f3n programada PHF2 Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"159","name":"Final Hourly Schedule PHF2 Mining subproducts","name_es":"Generaci\u00f3n programada PHF2 Subproductos miner\u00eda","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"160","name":"Final Hourly Schedule PHF2 Residual energy","name_es":"Generaci\u00f3n programada PHF2 Energ\u00eda residual","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"161","name":"Final Hourly Schedule PHF2 Biomass","name_es":"Generaci\u00f3n programada PHF2 Biomasa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"162","name":"Final Hourly Schedule PHF2 Biogas","name_es":"Generaci\u00f3n programada PHF2 Biog\u00e1s","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"163","name":"Final Hourly Schedule PHF2 Household and similar wastes","name_es":"Generaci\u00f3n programada PHF2 Residuos dom\u00e9sticos y similares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"164","name":"Final Hourly Schedule PHF2 Sundry waste","name_es":"Generaci\u00f3n programada PHF2 Residuos varios","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"165","name":"Final Hourly Schedule PHF2 Pump consumption","name_es":"Generaci\u00f3n programada PHF2 Consumo bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"167","name":"Final Hourly Schedule PHF2 Generic","name_es":"Generaci\u00f3n programada PHF2 Gen\u00e9ricas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"168","name":"Final Hourly Schedule PHF2 Import France","name_es":"Generaci\u00f3n programada PHF2 Importaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"169","name":"Final Hourly Schedule PHF2 Import Portugal","name_es":"Generaci\u00f3n programada PHF2 Importaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"170","name":"Final Hourly Schedule PHF2 Import Morocco","name_es":"Generaci\u00f3n programada PHF2 Importaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"171","name":"Final Hourly Schedule PHF2 Import Andorra","name_es":"Generaci\u00f3n programada PHF2 Importaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"172","name":"Final Hourly Schedule PHF2 Export France","name_es":"Generaci\u00f3n programada PHF2 Exportaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"173","name":"Final Hourly Schedule PHF2 Export Portugal","name_es":"Generaci\u00f3n programada PHF2 Exportaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"174","name":"Final Hourly Schedule PHF2 Export Morocco","name_es":"Generaci\u00f3n programada PHF2 Exportaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"175","name":"Final Hourly Schedule PHF2 Export Andorra","name_es":"Generaci\u00f3n programada PHF2 Exportaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"176","name":"Final Hourly Schedule PHF3 Hydro UGH","name_es":"Generaci\u00f3n programada PHF3 Hidr\u00e1ulica UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"177","name":"Final Hourly Schedule PHF3 Hydro non UGH","name_es":"Generaci\u00f3n programada PHF3 Hidr\u00e1ulica no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"178","name":"Final Hourly Schedule PHF3 Turbine pumping","name_es":"Generaci\u00f3n programada PHF3 Turbinaci\u00f3n bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"179","name":"Final Hourly Schedule PHF3 Nuclear","name_es":"Generaci\u00f3n programada PHF3 Nuclear","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"180","name":"Final Hourly Schedule PHF3 Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF3 Hulla antracita Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"181","name":"Final Hourly Schedule PHF3 Sub-bituminous coal Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF3 Hulla sub-bituminosa Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"182","name":"Final Hourly Schedule PHF3 Soft coal/Anthracite","name_es":"Generaci\u00f3n programada PHF3 Hulla antracita","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"183","name":"Final Hourly Schedule PHF3 Sub-bituminous coal","name_es":"Generaci\u00f3n programada PHF3 Hulla sub-bituminosa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"184","name":"Final Hourly Schedule PHF3 Combined cycle GT","name_es":"Generaci\u00f3n programada PHF3 Ciclo combinado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"185","name":"Final Hourly Schedule PHF3 Fuel","name_es":"Generaci\u00f3n programada PHF3 Fuel","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"186","name":"Final Hourly Schedule PHF3 Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada PHF3 Gas Natural - Turbina de vapor","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"187","name":"Final Hourly Schedule PHF3 Onshore wind","name_es":"Generaci\u00f3n programada PHF3 E\u00f3lica terrestre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"188","name":"Final Hourly Schedule PHF3 Offshore wind","name_es":"Generaci\u00f3n programada PHF3 E\u00f3lica marina","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"189","name":"Final Hourly Schedule PHF3 Solar PV","name_es":"Generaci\u00f3n programada PHF3 Solar fotovoltaica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"190","name":"Final Hourly Schedule PHF3 Solar thermal","name_es":"Generaci\u00f3n programada PHF3 Solar t\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"191","name":"Final Hourly Schedule PHF3 Geothermal and Ocean","name_es":"Generaci\u00f3n programada PHF3 Oc\u00e9ano y geot\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"192","name":"Final Hourly Schedule PHF3 Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada PHF3 Gas Natural Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"193","name":"Final Hourly Schedule PHF3 Fossil Oil","name_es":"Generaci\u00f3n programada PHF3 Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"194","name":"Final Hourly Schedule PHF3 Mining subproducts","name_es":"Generaci\u00f3n programada PHF3 Subproductos miner\u00eda","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"195","name":"Final Hourly Schedule PHF3 Residual energy","name_es":"Generaci\u00f3n programada PHF3 Energ\u00eda residual","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"196","name":"Final Hourly Schedule PHF3 Biomass","name_es":"Generaci\u00f3n programada PHF3 Biomasa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"197","name":"Final Hourly Schedule PHF3 Biogas","name_es":"Generaci\u00f3n programada PHF3 Biog\u00e1s","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"198","name":"Final Hourly Schedule PHF3 Household and similar wastes","name_es":"Generaci\u00f3n programada PHF3 Residuos dom\u00e9sticos y similares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"199","name":"Final Hourly Schedule PHF3 Sundry waste","name_es":"Generaci\u00f3n programada PHF3 Residuos varios","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"200","name":"Final Hourly Schedule PHF3 Pump consumption","name_es":"Generaci\u00f3n programada PHF3 Consumo bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"202","name":"Final Hourly Schedule PHF3 Generic","name_es":"Generaci\u00f3n programada PHF3 Gen\u00e9ricas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"203","name":"Final Hourly Schedule PHF3 Import France","name_es":"Generaci\u00f3n programada PHF3 Importaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"204","name":"Final Hourly Schedule PHF3 Import Portugal","name_es":"Generaci\u00f3n programada PHF3 Importaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"205","name":"Final Hourly Schedule PHF3 Import Morocco","name_es":"Generaci\u00f3n programada PHF3 Importaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"206","name":"Final Hourly Schedule PHF3 Import Andorra","name_es":"Generaci\u00f3n programada PHF3 Importaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"207","name":"Final Hourly Schedule PHF3 Export France","name_es":"Generaci\u00f3n programada PHF3 Exportaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"208","name":"Final Hourly Schedule PHF3 Export Portugal","name_es":"Generaci\u00f3n programada PHF3 Exportaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"209","name":"Final Hourly Schedule PHF3 Export Morocco","name_es":"Generaci\u00f3n programada PHF3 Exportaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"210","name":"Final Hourly Schedule PHF3 Export Andorra","name_es":"Generaci\u00f3n programada PHF3 Exportaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"211","name":"Final Hourly Schedule PHF4 Hydro UGH","name_es":"Generaci\u00f3n programada PHF4 Hidr\u00e1ulica UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"212","name":"Final Hourly Schedule PHF4 Hydro non UGH","name_es":"Generaci\u00f3n programada PHF4 Hidr\u00e1ulica no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"213","name":"Final Hourly Schedule PHF4 Turbine pumping","name_es":"Generaci\u00f3n programada PHF4 Turbinaci\u00f3n bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"214","name":"Final Hourly Schedule PHF4 Nuclear","name_es":"Generaci\u00f3n programada PHF4 Nuclear","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"215","name":"Final Hourly Schedule PHF4 Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF4 Hulla antracita Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"216","name":"Final Hourly Schedule PHF4 Sub-bituminous coal Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF4 Hulla sub-bituminosa Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"217","name":"Final Hourly Schedule PHF4 Soft coal/Anthracite","name_es":"Generaci\u00f3n programada PHF4 Hulla antracita","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"218","name":"Final Hourly Schedule PHF4 Sub-bituminous coal","name_es":"Generaci\u00f3n programada PHF4 Hulla sub-bituminosa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"219","name":"Final Hourly Schedule PHF4 Combined cycle GT","name_es":"Generaci\u00f3n programada PHF4 Ciclo combinado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"220","name":"Final Hourly Schedule PHF4 Fuel","name_es":"Generaci\u00f3n programada PHF4 Fuel","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"221","name":"Final Hourly Schedule PHF4 Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada PHF4 Gas Natural - Turbina de vapor","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"222","name":"Final Hourly Schedule PHF4 Onshore wind","name_es":"Generaci\u00f3n programada PHF4 E\u00f3lica terrestre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"223","name":"Final Hourly Schedule PHF4 Offshore wind","name_es":"Generaci\u00f3n programada PHF4 E\u00f3lica marina","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"224","name":"Final Hourly Schedule PHF4 Solar PV","name_es":"Generaci\u00f3n programada PHF4 Solar fotovoltaica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"225","name":"Final Hourly Schedule PHF4 Solar thermal","name_es":"Generaci\u00f3n programada PHF4 Solar t\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"226","name":"Final Hourly Schedule PHF4 Geothermal and Ocean","name_es":"Generaci\u00f3n programada PHF4 Oc\u00e9ano y geot\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"227","name":"Final Hourly Schedule PHF4 Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada PHF4 Gas Natural Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"228","name":"Final Hourly Schedule PHF4 Fossil Oil","name_es":"Generaci\u00f3n programada PHF4 Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"229","name":"Final Hourly Schedule PHF4 Mining subproducts","name_es":"Generaci\u00f3n programada PHF4 Subproductos miner\u00eda","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"230","name":"Final Hourly Schedule PHF4 Residual energy","name_es":"Generaci\u00f3n programada PHF4 Energ\u00eda residual","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"231","name":"Final Hourly Schedule PHF4 Biomass","name_es":"Generaci\u00f3n programada PHF4 Biomasa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"232","name":"Final Hourly Schedule PHF4 Biogas","name_es":"Generaci\u00f3n programada PHF4 Biog\u00e1s","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"233","name":"Final Hourly Schedule PHF4 Household and similar wastes","name_es":"Generaci\u00f3n programada PHF4 Residuos dom\u00e9sticos y similares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"234","name":"Final Hourly Schedule PHF4 Sundry waste","name_es":"Generaci\u00f3n programada PHF4 Residuos varios","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"235","name":"Final Hourly Schedule PHF4 Pump consumption","name_es":"Generaci\u00f3n programada PHF4 Consumo bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"237","name":"Final Hourly Schedule PHF4 Generic","name_es":"Generaci\u00f3n programada PHF4 Gen\u00e9ricas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"238","name":"Final Hourly Schedule PHF4 Import France","name_es":"Generaci\u00f3n programada PHF4 Importaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"239","name":"Final Hourly Schedule PHF4 Import Portugal","name_es":"Generaci\u00f3n programada PHF4 Importaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"240","name":"Final Hourly Schedule PHF4 Import Morocco","name_es":"Generaci\u00f3n programada PHF4 Importaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"241","name":"Final Hourly Schedule PHF4 Import Andorra","name_es":"Generaci\u00f3n programada PHF4 Importaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"242","name":"Final Hourly Schedule PHF4 Export France","name_es":"Generaci\u00f3n programada PHF4 Exportaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"243","name":"Final Hourly Schedule PHF4 Export Portugal","name_es":"Generaci\u00f3n programada PHF4 Exportaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"244","name":"Final Hourly Schedule PHF4 Export Morocco","name_es":"Generaci\u00f3n programada PHF4 Exportaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"245","name":"Final Hourly Schedule PHF4 Export Andorra","name_es":"Generaci\u00f3n programada PHF4 Exportaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"246","name":"Final Hourly Schedule PHF5 Hydro UGH","name_es":"Generaci\u00f3n programada PHF5 Hidr\u00e1ulica UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"247","name":"Final Hourly Schedule PHF5 Hydro non UGH","name_es":"Generaci\u00f3n programada PHF5 Hidr\u00e1ulica no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"248","name":"Final Hourly Schedule PHF5 Turbine pumping","name_es":"Generaci\u00f3n programada PHF5 Turbinaci\u00f3n bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"249","name":"Final Hourly Schedule PHF5 Nuclear","name_es":"Generaci\u00f3n programada PHF5 Nuclear","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"250","name":"Final Hourly Schedule PHF5 Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF5 Hulla antracita Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"251","name":"Final Hourly Schedule PHF5 Sub-bituminous coal Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF5 Hulla sub-bituminosa Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"252","name":"Final Hourly Schedule PHF5 Soft coal/Anthracite","name_es":"Generaci\u00f3n programada PHF5 Hulla antracita","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"253","name":"Final Hourly Schedule PHF5 Sub-bituminous coal","name_es":"Generaci\u00f3n programada PHF5 Hulla sub-bituminosa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"254","name":"Final Hourly Schedule PHF5 Combined cycle GT","name_es":"Generaci\u00f3n programada PHF5 Ciclo combinado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"255","name":"Final Hourly Schedule PHF5 Fuel","name_es":"Generaci\u00f3n programada PHF5 Fuel","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"256","name":"Final Hourly Schedule PHF5 Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada PHF5 Gas Natural - Turbina de vapor","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"257","name":"Final Hourly Schedule PHF5 Onshore wind","name_es":"Generaci\u00f3n programada PHF5 E\u00f3lica terrestre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"258","name":"Final Hourly Schedule PHF5 Offshore wind","name_es":"Generaci\u00f3n programada PHF5 E\u00f3lica marina","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"259","name":"Final Hourly Schedule PHF5 Solar PV","name_es":"Generaci\u00f3n programada PHF5 Solar fotovoltaica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"260","name":"Final Hourly Schedule PHF5 Solar thermal","name_es":"Generaci\u00f3n programada PHF5 Solar t\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"261","name":"Final Hourly Schedule PHF5 Geothermal and Ocean","name_es":"Generaci\u00f3n programada PHF5 Oc\u00e9ano y geot\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"262","name":"Final Hourly Schedule PHF5 Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada PHF5 Gas Natural Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"263","name":"Final Hourly Schedule PHF5 Fossil Oil","name_es":"Generaci\u00f3n programada PHF5 Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"264","name":"Final Hourly Schedule PHF5 Mining subproducts","name_es":"Generaci\u00f3n programada PHF5 Subproductos miner\u00eda","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"265","name":"Final Hourly Schedule PHF5 Residual energy","name_es":"Generaci\u00f3n programada PHF5 Energ\u00eda residual","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"266","name":"Final Hourly Schedule PHF5 Biomass","name_es":"Generaci\u00f3n programada PHF5 Biomasa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"267","name":"Final Hourly Schedule PHF5 Biogas","name_es":"Generaci\u00f3n programada PHF5 Biog\u00e1s","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"268","name":"Final Hourly Schedule PHF5 Household and similar wastes","name_es":"Generaci\u00f3n programada PHF5 Residuos dom\u00e9sticos y similares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"269","name":"Final Hourly Schedule PHF5 Sundry waste","name_es":"Generaci\u00f3n programada PHF5 Residuos varios","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"270","name":"Final Hourly Schedule PHF5 Pump consumption","name_es":"Generaci\u00f3n programada PHF5 Consumo bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"272","name":"Final Hourly Schedule PHF5 Generic","name_es":"Generaci\u00f3n programada PHF5 Gen\u00e9ricas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"273","name":"Final Hourly Schedule PHF5 Import France","name_es":"Generaci\u00f3n programada PHF5 Importaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"274","name":"Final Hourly Schedule PHF5 Import Portugal","name_es":"Generaci\u00f3n programada PHF5 Importaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"275","name":"Final Hourly Schedule PHF5 Import Morocco","name_es":"Generaci\u00f3n programada PHF5 Importaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"276","name":"Final Hourly Schedule PHF5 Import Andorra","name_es":"Generaci\u00f3n programada PHF5 Importaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"277","name":"Final Hourly Schedule PHF5 Export France","name_es":"Generaci\u00f3n programada PHF5 Exportaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"278","name":"Final Hourly Schedule PHF5 Export Portugal","name_es":"Generaci\u00f3n programada PHF5 Exportaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"279","name":"Final Hourly Schedule PHF5 Export Morocco","name_es":"Generaci\u00f3n programada PHF5 Exportaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"280","name":"Final Hourly Schedule PHF5 Export Andorra","name_es":"Generaci\u00f3n programada PHF5 Exportaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"281","name":"Final Hourly Schedule PHF6 Hydro UGH","name_es":"Generaci\u00f3n programada PHF6 Hidr\u00e1ulica UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"282","name":"Final Hourly Schedule PHF6 Hydro non UGH","name_es":"Generaci\u00f3n programada PHF6 Hidr\u00e1ulica no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"283","name":"Final Hourly Schedule PHF6 Turbine pumping","name_es":"Generaci\u00f3n programada PHF6 Turbinaci\u00f3n bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"284","name":"Final Hourly Schedule PHF6 Nuclear","name_es":"Generaci\u00f3n programada PHF6 Nuclear","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"285","name":"Final Hourly Schedule PHF6 Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF6 Hulla antracita Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"286","name":"Final Hourly Schedule PHF6 Sub-bituminous coal Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF6 Hulla sub-bituminosa Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"287","name":"Final Hourly Schedule PHF6 Soft coal/Anthracite","name_es":"Generaci\u00f3n programada PHF6 Hulla antracita","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"288","name":"Final Hourly Schedule PHF6 Sub-bituminous coal","name_es":"Generaci\u00f3n programada PHF6 Hulla sub-bituminosa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"289","name":"Final Hourly Schedule PHF6 Combined cycle GT","name_es":"Generaci\u00f3n programada PHF6 Ciclo combinado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"290","name":"Final Hourly Schedule PHF6 Fuel","name_es":"Generaci\u00f3n programada PHF6 Fuel","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"291","name":"Final Hourly Schedule PHF6 Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada PHF6 Gas Natural - Turbina de vapor","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"292","name":"Final Hourly Schedule PHF6 Onshore wind","name_es":"Generaci\u00f3n programada PHF6 E\u00f3lica terrestre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"293","name":"Final Hourly Schedule PHF6 Offshore wind","name_es":"Generaci\u00f3n programada PHF6 E\u00f3lica marina","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"294","name":"Final Hourly Schedule PHF6 Solar PV","name_es":"Generaci\u00f3n programada PHF6 Solar fotovoltaica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"295","name":"Final Hourly Schedule PHF6 Solar thermal","name_es":"Generaci\u00f3n programada PHF6 Solar t\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"296","name":"Final Hourly Schedule PHF6 Geothermal and Ocean","name_es":"Generaci\u00f3n programada PHF6 Oc\u00e9ano y geot\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"297","name":"Final Hourly Schedule PHF6 Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada PHF6 Gas Natural Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"298","name":"Final Hourly Schedule PHF6 Fossil Oil","name_es":"Generaci\u00f3n programada PHF6 Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"299","name":"Final Hourly Schedule PHF6 Mining subproducts","name_es":"Generaci\u00f3n programada PHF6 Subproductos miner\u00eda","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"300","name":"Final Hourly Schedule PHF6 Residual energy","name_es":"Generaci\u00f3n programada PHF6 Energ\u00eda residual","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"301","name":"Final Hourly Schedule PHF6 Biomass","name_es":"Generaci\u00f3n programada PHF6 Biomasa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"302","name":"Final Hourly Schedule PHF6 Biogas","name_es":"Generaci\u00f3n programada PHF6 Biog\u00e1s","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"303","name":"Final Hourly Schedule PHF6 Household and similar wastes","name_es":"Generaci\u00f3n programada PHF6 Residuos dom\u00e9sticos y similares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"304","name":"Final Hourly Schedule PHF6 Sundry waste","name_es":"Generaci\u00f3n programada PHF6 Residuos varios","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"305","name":"Final Hourly Schedule PHF6 Pump consumption","name_es":"Generaci\u00f3n programada PHF6 Consumo bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"307","name":"Final Hourly Schedule PHF6 Generic","name_es":"Generaci\u00f3n programada PHF6 Gen\u00e9ricas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"308","name":"Final Hourly Schedule PHF6 Import France","name_es":"Generaci\u00f3n programada PHF6 Importaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"309","name":"Final Hourly Schedule PHF6 Import Portugal","name_es":"Generaci\u00f3n programada PHF6 Importaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"310","name":"Final Hourly Schedule PHF6 Import Morocco","name_es":"Generaci\u00f3n programada PHF6 Importaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"311","name":"Final Hourly Schedule PHF6 Import Andorra","name_es":"Generaci\u00f3n programada PHF6 Importaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"312","name":"Final Hourly Schedule PHF6 Export France","name_es":"Generaci\u00f3n programada PHF6 Exportaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"313","name":"Final Hourly Schedule PHF6 Export Portugal","name_es":"Generaci\u00f3n programada PHF6 Exportaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"314","name":"Final Hourly Schedule PHF6 Export Morocco","name_es":"Generaci\u00f3n programada PHF6 Exportaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"315","name":"Final Hourly Schedule PHF6 Export Andorra","name_es":"Generaci\u00f3n programada PHF6 Exportaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"316","name":"Final Hourly Schedule PHF7 Hydro UGH","name_es":"Generaci\u00f3n programada PHF7 Hidr\u00e1ulica UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"317","name":"Final Hourly Schedule PHF7 Hydro non UGH","name_es":"Generaci\u00f3n programada PHF7 Hidr\u00e1ulica no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"318","name":"Final Hourly Schedule PHF7 Turbine pumping","name_es":"Generaci\u00f3n programada PHF7 Turbinaci\u00f3n bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"319","name":"Final Hourly Schedule PHF7 Nuclear","name_es":"Generaci\u00f3n programada PHF7 Nuclear","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"320","name":"Final Hourly Schedule PHF7 Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF7 Hulla antracita Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"321","name":"Final Hourly Schedule PHF7 Sub-bituminous coal Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHF7 Hulla sub-bituminosa Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"322","name":"Final Hourly Schedule PHF7 Soft coal/Anthracite","name_es":"Generaci\u00f3n programada PHF7 Hulla antracita","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"323","name":"Final Hourly Schedule PHF7 Sub-bituminous coal","name_es":"Generaci\u00f3n programada PHF7 Hulla sub-bituminosa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"324","name":"Final Hourly Schedule PHF7 Combined cycle GT","name_es":"Generaci\u00f3n programada PHF7 Ciclo combinado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"325","name":"Final Hourly Schedule PHF7 Fuel","name_es":"Generaci\u00f3n programada PHF7 Fuel","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"326","name":"Final Hourly Schedule PHF7 Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada PHF7 Gas Natural - Turbina de vapor","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"327","name":"Final Hourly Schedule PHF7 Onshore wind","name_es":"Generaci\u00f3n programada PHF7 E\u00f3lica terrestre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"328","name":"Final Hourly Schedule PHF7 Offshore wind","name_es":"Generaci\u00f3n programada PHF7 E\u00f3lica marina","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"329","name":"Final Hourly Schedule PHF7 Solar PV","name_es":"Generaci\u00f3n programada PHF7 Solar fotovoltaica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"330","name":"Final Hourly Schedule PHF7 Solar thermal","name_es":"Generaci\u00f3n programada PHF7 Solar t\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"331","name":"Final Hourly Schedule PHF7 Geothermal and Ocean","name_es":"Generaci\u00f3n programada PHF7 Oc\u00e9ano y geot\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"332","name":"Final Hourly Schedule PHF7 Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada PHF7 Gas Natural Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"333","name":"Final Hourly Schedule PHF7 Fossil Oil","name_es":"Generaci\u00f3n programada PHF7 Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"334","name":"Final Hourly Schedule PHF7 Mining subproducts","name_es":"Generaci\u00f3n programada PHF7 Subproductos miner\u00eda","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"335","name":"Final Hourly Schedule PHF7 Residual energy","name_es":"Generaci\u00f3n programada PHF7 Energ\u00eda residual","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"336","name":"Final Hourly Schedule PHF7 Biomass","name_es":"Generaci\u00f3n programada PHF7 Biomasa","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"337","name":"Final Hourly Schedule PHF7 Biogas","name_es":"Generaci\u00f3n programada PHF7 Biog\u00e1s","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"338","name":"Final Hourly Schedule PHF7 Household and similar wastes","name_es":"Generaci\u00f3n programada PHF7 Residuos dom\u00e9sticos y similares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"339","name":"Final Hourly Schedule PHF7 Sundry waste","name_es":"Generaci\u00f3n programada PHF7 Residuos varios","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"340","name":"Final Hourly Schedule PHF7 Pump consumption","name_es":"Generaci\u00f3n programada PHF7 Consumo bombeo","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"342","name":"Final Hourly Schedule PHF7 Generic","name_es":"Generaci\u00f3n programada PHF7 Gen\u00e9ricas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"343","name":"Final Hourly Schedule PHF7 Import France","name_es":"Generaci\u00f3n programada PHF7 Importaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"344","name":"Final Hourly Schedule PHF7 Import Portugal","name_es":"Generaci\u00f3n programada PHF7 Importaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"345","name":"Final Hourly Schedule PHF7 Import Morocco","name_es":"Generaci\u00f3n programada PHF7 Importaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"346","name":"Final Hourly Schedule PHF7 Import Andorra","name_es":"Generaci\u00f3n programada PHF7 Importaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"347","name":"Final Hourly Schedule PHF7 Export France","name_es":"Generaci\u00f3n programada PHF7 Exportaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"348","name":"Final Hourly Schedule PHF7 Export Portugal","name_es":"Generaci\u00f3n programada PHF7 Exportaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"349","name":"Final Hourly Schedule PHF7 Export Morocco","name_es":"Generaci\u00f3n programada PHF7 Exportaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"350","name":"Final Hourly Schedule PHF7 Export Andorra","name_es":"Generaci\u00f3n programada PHF7 Exportaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"374","name":"Final Hourly Schedule PHF1 Market direct consumption","name_es":"Demanda programada PHF1 Consumos directos en mercado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"375","name":"Final Hourly Schedule PHF1 Aux. Svcs. Consumption","name_es":"Demanda programada PHF1 Consumo de Servicios Auxiliares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"376","name":"Final Hourly Schedule PHF1 Wind adjustment","name_es":"Demanda programada PHF1 Correcci\u00f3n e\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"377","name":"Final Hourly Schedule PHF1 Solar adjustment","name_es":"Demanda programada PHF1 Correcci\u00f3n solar","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"378","name":"Final Hourly Schedule PHF1 REE adjustment","name_es":"Demanda programada PHF1 Correcci\u00f3n REE","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator is\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"381","name":"Final Hourly Schedule PHF2 Market direct consumption","name_es":"Demanda programada PHF2 Consumos directos en mercado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"382","name":"Final Hourly Schedule PHF2 Aux. Svcs. Consumption","name_es":"Demanda programada PHF2 Consumo de Servicios Auxiliares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"383","name":"Final Hourly Schedule PHF2 Wind adjustment","name_es":"Demanda programada PHF2 Correcci\u00f3n e\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"384","name":"Final Hourly Schedule PHF2 Solar adjustment","name_es":"Demanda programada PHF2 Correcci\u00f3n solar","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"385","name":"Final Hourly Schedule PHF2 REE adjustment","name_es":"Demanda programada PHF2 Correcci\u00f3n REE","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator is\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"388","name":"Final Hourly Schedule PHF3 Market direct consumption","name_es":"Demanda programada PHF3 Consumos directos en mercado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"389","name":"Final Hourly Schedule PHF3 Aux. Svcs. Consumption","name_es":"Demanda programada PHF3 Consumo de Servicios Auxiliares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"390","name":"Final Hourly Schedule PHF3 Wind adjustment","name_es":"Demanda programada PHF3 Correcci\u00f3n e\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"391","name":"Final Hourly Schedule PHF3 Solar adjustment","name_es":"Demanda programada PHF3 Correcci\u00f3n solar","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"392","name":"Final Hourly Schedule PHF3 REE adjustment","name_es":"Demanda programada PHF3 Correcci\u00f3n REE","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator is\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"395","name":"Final Hourly Schedule PHF4 Market direct consumption","name_es":"Demanda programada PHF4 Consumos directos en mercado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"396","name":"Final Hourly Schedule PHF4 Aux. Svcs. Consumption","name_es":"Demanda programada PHF4 Consumo de Servicios Auxiliares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"397","name":"Final Hourly Schedule PHF4 Wind adjustment","name_es":"Demanda programada PHF4 Correcci\u00f3n e\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"398","name":"Final Hourly Schedule PHF4 Solar adjustment","name_es":"Demanda programada PHF4 Correcci\u00f3n solar","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"399","name":"Final Hourly Schedule PHF4 REE adjustment","name_es":"Demanda programada PHF4 Correcci\u00f3n REE","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator is\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"402","name":"Final Hourly Schedule PHF5 Market direct consumption","name_es":"Demanda programada PHF5 Consumos directos en mercado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"403","name":"Final Hourly Schedule PHF5 Aux. Svcs. Consumption","name_es":"Demanda programada PHF5 Consumo de Servicios Auxiliares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"404","name":"Final Hourly Schedule PHF5 Wind adjustment","name_es":"Demanda programada PHF5 Correcci\u00f3n e\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"405","name":"Final Hourly Schedule PHF5 Solar adjustment","name_es":"Demanda programada PHF5 Correcci\u00f3n solar","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"406","name":"Final Hourly Schedule PHF5 REE adjustment","name_es":"Demanda programada PHF5 Correcci\u00f3n REE","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator is\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"409","name":"Final Hourly Schedule PHF6 Market direct consumption","name_es":"Demanda programada PHF6 Consumos directos en mercado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"410","name":"Final Hourly Schedule PHF6 Aux. Svcs. Consumption","name_es":"Demanda programada PHF6 Consumo de Servicios Auxiliares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"411","name":"Final Hourly Schedule PHF6 Wind adjustment","name_es":"Demanda programada PHF6 Correcci\u00f3n e\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"412","name":"Final Hourly Schedule PHF6 Solar adjustment","name_es":"Demanda programada PHF6 Correcci\u00f3n solar","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"413","name":"Final Hourly Schedule PHF6 REE adjustment","name_es":"Demanda programada PHF6 Correcci\u00f3n REE","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator is\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"416","name":"Final Hourly Schedule PHF7 Market direct consumption","name_es":"Demanda programada PHF7 Consumos directos en mercado","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"417","name":"Final Hourly Schedule PHF7 Aux. Svcs. Consumption","name_es":"Demanda programada PHF7 Consumo de Servicios Auxiliares","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"418","name":"Final Hourly Schedule PHF7 Wind adjustment","name_es":"Demanda programada PHF7 Correcci\u00f3n e\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"419","name":"Final Hourly Schedule PHF7 Solar adjustment","name_es":"Demanda programada PHF7 Correcci\u00f3n solar","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"420","name":"Final Hourly Schedule PHF7 REE adjustment","name_es":"Demanda programada PHF7 Correcci\u00f3n REE","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator is\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1400","name":"Final Hourly Schedule PHFC Hydro UGH","name_es":"Generaci\u00f3n programada PHFC Hidr\u00e1ulica UGH","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1401","name":"Final Hourly Schedule PHFC Hydro non UGH","name_es":"Generaci\u00f3n programada PHFC Hidr\u00e1ulica no UGH","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1402","name":"Final Hourly Schedule PHFC Turbine pumping","name_es":"Generaci\u00f3n programada PHFC Turbinaci\u00f3n bombeo","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1403","name":"Final Hourly Schedule PHFC Nuclear","name_es":"Generaci\u00f3n programada PHFC Nuclear","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1404","name":"Final Hourly Schedule PHFC Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHFC Hulla antracita Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1405","name":"Final Hourly Schedule PHFC Sub-bituminous coal Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PHFC Hulla sub-bituminosa Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1406","name":"Final Hourly Schedule PHFC Soft coal/Anthracite","name_es":"Generaci\u00f3n programada PHFC Hulla antracita","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1407","name":"Final Hourly Schedule PHFC Sub-bituminous coal","name_es":"Generaci\u00f3n programada PHFC Hulla sub-bituminosa","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1408","name":"Final Hourly Schedule PHFC Combined cycle GT","name_es":"Generaci\u00f3n programada PHFC Ciclo combinado","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1409","name":"Final Hourly Schedule PHFC Fuel","name_es":"Generaci\u00f3n programada PHFC Fuel","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1410","name":"Final Hourly Schedule PHFC Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada PHFC Gas Natural - Turbina de vapor","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1411","name":"Final Hourly Schedule PHFC Onshore wind","name_es":"Generaci\u00f3n programada PHFC E\u00f3lica terrestre","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1412","name":"Final Hourly Schedule PHFC Offshore wind","name_es":"Generaci\u00f3n programada PHFC E\u00f3lica marina","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1413","name":"Final Hourly Schedule PHFC Solar PV","name_es":"Generaci\u00f3n programada PHFC Solar fotovoltaica","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1414","name":"Final Hourly Schedule PHFC Solar thermal","name_es":"Generaci\u00f3n programada PHFC Solar t\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1415","name":"Final Hourly Schedule PHFC Geothermal and Ocean","name_es":"Generaci\u00f3n programada PHFC Oc\u00e9ano y geot\u00e9rmica","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1416","name":"Final Hourly Schedule PHFC Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada PHFC Gas Natural Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1417","name":"Final Hourly Schedule PHFC Fossil Oil","name_es":"Generaci\u00f3n programada PHFC Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1418","name":"Final Hourly Schedule PHFC Mining subproducts","name_es":"Generaci\u00f3n programada PHFC Subproductos miner\u00eda","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1419","name":"Final Hourly Schedule PHFC Residual energy","name_es":"Generaci\u00f3n programada PHFC Energ\u00eda residual","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1420","name":"Final Hourly Schedule PHFC Biomass","name_es":"Generaci\u00f3n programada PHFC Biomasa","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1421","name":"Final Hourly Schedule PHFC Biogas","name_es":"Generaci\u00f3n programada PHFC Biog\u00e1s","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1422","name":"Final Hourly Schedule PHFC Household and similar wastes","name_es":"Generaci\u00f3n programada PHFC Residuos dom\u00e9sticos y similares","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1423","name":"Final Hourly Schedule PHFC Sundry waste","name_es":"Generaci\u00f3n programada PHFC Residuos varios","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1424","name":"Final Hourly Schedule PHFC Pump consumption","name_es":"Generaci\u00f3n programada PHFC Consumo bombeo","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1426","name":"Final Hourly Schedule PHFC Generic","name_es":"Generaci\u00f3n programada PHFC Gen\u00e9ricas","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1427","name":"Final Hourly Schedule PHFC Import France","name_es":"Generaci\u00f3n programada PHFC Importaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1428","name":"Final Hourly Schedule PHFC Import Portugal","name_es":"Generaci\u00f3n programada PHFC Importaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1429","name":"Final Hourly Schedule PHFC Import Morocco","name_es":"Generaci\u00f3n programada PHFC Importaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1430","name":"Final Hourly Schedule PHFC Import Andorra","name_es":"Generaci\u00f3n programada PHFC Importaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1431","name":"Final Hourly Schedule PHFC Export France","name_es":"Generaci\u00f3n programada PHFC Exportaci\u00f3n Francia","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1432","name":"Final Hourly Schedule PHFC Export Portugal","name_es":"Generaci\u00f3n programada PHFC Exportaci\u00f3n Portugal","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1433","name":"Final Hourly Schedule PHFC Export Morocco","name_es":"Generaci\u00f3n programada PHFC Exportaci\u00f3n Marruecos","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1434","name":"Final Hourly Schedule PHFC Export Andorra","name_es":"Generaci\u00f3n programada PHFC Exportaci\u00f3n Andorra","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1437","name":"Final Hourly Schedule PHFC Market direct consumption","name_es":"Demanda programada PHFC Consumos directos en mercado","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1438","name":"Final Hourly Schedule PHFC Aux. Svcs. Consumption","name_es":"Demanda programada PHFC Consumo de Servicios Auxiliares","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1439","name":"Final Hourly Schedule PHFC Wind adjustment","name_es":"Demanda programada PHFC Correcci\u00f3n e\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1440","name":"Final Hourly Schedule PHFC Solar adjustment","name_es":"Demanda programada PHFC Correcci\u00f3n solar","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1441","name":"Final Hourly Schedule PHFC REE adjustment","name_es":"Demanda programada PHFC Correcci\u00f3n REE","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2133","name":"Scheduled Generation PHF1 Hybridization","name_es":"Generaci\u00f3n programada PHF1 Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2134","name":"Scheduled Generation PHF2 Hybridization","name_es":"Generaci\u00f3n programada PHF2 Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2135","name":"Scheduled Generation PHF3 Hybridization","name_es":"Generaci\u00f3n programada PHF3 Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2136","name":"Scheduled Generation PHF4 Hybridization","name_es":"Generaci\u00f3n programada PHF4 Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2137","name":"Scheduled Generation PHF5 Hybridization","name_es":"Generaci\u00f3n programada PHF5 Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2138","name":"Scheduled Generation PHF6 Hybridization","name_es":"Generaci\u00f3n programada PHF6 Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2139","name":"Scheduled Generation PHF7 Hybridization","name_es":"Generaci\u00f3n programada PHF7 Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2140","name":"Scheduled Generation PHFC Hybridization","name_es":"Generaci\u00f3n programada PHFC Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10066","name":"Final Hourly Schedule PHF1 UGH + non UGH","name_es":"Generaci\u00f3n programada PHF1 UGH + no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10067","name":"Final Hourly Schedule PHF2 UGH + non UGH","name_es":"Generaci\u00f3n programada PHF2 UGH + no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10068","name":"Final Hourly Schedule PHF3 UGH + non UGH","name_es":"Generaci\u00f3n programada PHF3 UGH + no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10069","name":"Final Hourly Schedule PHF4 UGH + non UGH","name_es":"Generaci\u00f3n programada PHF4 UGH + no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10070","name":"Final Hourly Schedule PHF5 UGH + non UGH","name_es":"Generaci\u00f3n programada PHF5 UGH + no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10071","name":"Final Hourly Schedule PHF6 UGH + non UGH","name_es":"Generaci\u00f3n programada PHF6 UGH + no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10072","name":"Final Hourly Schedule PHF7 UGH + non UGH","name_es":"Generaci\u00f3n programada PHF7 UGH + no UGH","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10079","name":"Final Hourly Schedule PHF1 Fuel-Gas","name_es":"Generaci\u00f3n programada PHF1 Fuel-Gas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10080","name":"Final Hourly Schedule PHF2 Fuel-Gas","name_es":"Generaci\u00f3n programada PHF2 Fuel-Gas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10081","name":"Final Hourly Schedule PHF3 Fuel-Gas","name_es":"Generaci\u00f3n programada PHF3 Fuel-Gas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10082","name":"Final Hourly Schedule PHF4 Fuel-Gas","name_es":"Generaci\u00f3n programada PHF4 Fuel-Gas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10083","name":"Final Hourly Schedule PHF5 Fuel-Gas","name_es":"Generaci\u00f3n programada PHF5 Fuel-Gas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10084","name":"Final Hourly Schedule PHF6 Fuel-Gas","name_es":"Generaci\u00f3n programada PHF6 Fuel-Gas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10085","name":"Final Hourly Schedule PHF7 Fuel-Gas","name_es":"Generaci\u00f3n programada PHF7 Fuel-Gas","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10088","name":"Final Hourly Schedule PHF1 Cogeneration","name_es":"Generaci\u00f3n programada PHF1 Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10089","name":"Final Hourly Schedule PHF2 Cogeneration","name_es":"Generaci\u00f3n programada PHF2 Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10090","name":"Final Hourly Schedule PHF3 Cogeneration","name_es":"Generaci\u00f3n programada PHF3 Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10091","name":"Final Hourly Schedule PHF4 Cogeneration","name_es":"Generaci\u00f3n programada PHF4 Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10092","name":"Final Hourly Schedule PHF5 Cogeneration","name_es":"Generaci\u00f3n programada PHF5 Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10093","name":"Final Hourly Schedule PHF6 Cogeneration","name_es":"Generaci\u00f3n programada PHF6 Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10094","name":"Final Hourly Schedule PHF7 Cogeneration","name_es":"Generaci\u00f3n programada PHF7 Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10097","name":"Final Hourly Schedule PHF1 Waste","name_es":"Generaci\u00f3n programada PHF1 Residuos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10098","name":"Final Hourly Schedule PHF2 Waste","name_es":"Generaci\u00f3n programada PHF2 Residuos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10099","name":"Final Hourly Schedule PHF3 Waste","name_es":"Generaci\u00f3n programada PHF3 Residuos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10100","name":"Final Hourly Schedule PHF4 Waste","name_es":"Generaci\u00f3n programada PHF4 Residuos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10101","name":"Final Hourly Schedule PHF5 Waste","name_es":"Generaci\u00f3n programada PHF5 Residuos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10102","name":"Final Hourly Schedule PHF6 Waste","name_es":"Generaci\u00f3n programada PHF6 Residuos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10103","name":"Final Hourly Schedule PHF7 Waste","name_es":"Generaci\u00f3n programada PHF7 Residuos","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10106","name":"Final Hourly Schedule PHF1 France balance","name_es":"Generaci\u00f3n programada PHF1 Saldo Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10107","name":"Final Hourly Schedule PHF2 France balance","name_es":"Generaci\u00f3n programada PHF2 Saldo Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10108","name":"Final Hourly Schedule PHF3 France balance","name_es":"Generaci\u00f3n programada PHF3 Saldo Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10109","name":"Final Hourly Schedule PHF4 France balance","name_es":"Generaci\u00f3n programada PHF4 Saldo Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10110","name":"Final Hourly Schedule PHF5 France balance","name_es":"Generaci\u00f3n programada PHF5 Saldo Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10111","name":"Final Hourly Schedule PHF6 France balance","name_es":"Generaci\u00f3n programada PHF6 Saldo Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10112","name":"Final Hourly Schedule PHF7 France balance","name_es":"Generaci\u00f3n programada PHF7 Saldo Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10115","name":"Final Hourly Schedule PHF1 Portugal balance","name_es":"Generaci\u00f3n programada PHF1 Saldo Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10116","name":"Final Hourly Schedule PHF2 Portugal balance","name_es":"Generaci\u00f3n programada PHF2 Saldo Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10117","name":"Final Hourly Schedule PHF3 Portugal balance","name_es":"Generaci\u00f3n programada PHF3 Saldo Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10118","name":"Final Hourly Schedule PHF4 Portugal balance","name_es":"Generaci\u00f3n programada PHF4 Saldo Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10119","name":"Final Hourly Schedule PHF5 Portugal balance","name_es":"Generaci\u00f3n programada PHF5 Saldo Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10120","name":"Final Hourly Schedule PHF6 Portugal balance","name_es":"Generaci\u00f3n programada PHF6 Saldo Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10121","name":"Final Hourly Schedule PHF7 Portugal balance","name_es":"Generaci\u00f3n programada PHF7 Saldo Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10124","name":"Final Hourly Schedule PHF1 Morocco balance","name_es":"Generaci\u00f3n programada PHF1 Saldo Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10125","name":"Final Hourly Schedule PHF2 Morocco balance","name_es":"Generaci\u00f3n programada PHF2 Saldo Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10126","name":"Final Hourly Schedule PHF3 Morocco balance","name_es":"Generaci\u00f3n programada PHF3 Saldo Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10127","name":"Final Hourly Schedule PHF4 Morocco balance","name_es":"Generaci\u00f3n programada PHF4 Saldo Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10128","name":"Final Hourly Schedule PHF5 Morocco balance","name_es":"Generaci\u00f3n programada PHF5 Saldo Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10129","name":"Final Hourly Schedule PHF6 Morocco balance","name_es":"Generaci\u00f3n programada PHF6 Saldo Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10130","name":"Final Hourly Schedule PHF7 Morocco balance","name_es":"Generaci\u00f3n programada PHF7 Saldo Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10133","name":"Final Hourly Schedule PHF1 Andorra balance","name_es":"Generaci\u00f3n programada PHF1 Saldo Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10134","name":"Final Hourly Schedule PHF2 Andorra balance","name_es":"Generaci\u00f3n programada PHF2 Saldo Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10136","name":"Final Hourly Schedule PHF3 Andorra balance","name_es":"Generaci\u00f3n programada PHF3 Saldo Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10137","name":"Final Hourly Schedule PHF4 Andorra balance","name_es":"Generaci\u00f3n programada PHF4 Saldo Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10138","name":"Final Hourly Schedule PHF5 Andorra balance","name_es":"Generaci\u00f3n programada PHF5 Saldo Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10139","name":"Final Hourly Schedule PHF6 Andorra balance","name_es":"Generaci\u00f3n programada PHF6 Saldo Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10140","name":"Final Hourly Schedule PHF7 Andorra balance","name_es":"Generaci\u00f3n programada PHF7 Saldo Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10143","name":"Final Hourly Schedule PHF1 Peninsular demand","name_es":"Demanda programada PHF1 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10144","name":"Final Hourly Schedule PHF2 total","name_es":"Demanda programada PHF2 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10145","name":"Final Hourly Schedule PHF3 total","name_es":"Demanda programada PHF3 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10146","name":"Final Hourly Schedule PHF4 total","name_es":"Demanda programada PHF4 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10147","name":"Final Hourly Schedule PHF5 total","name_es":"Demanda programada PHF5 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10148","name":"Final Hourly Schedule PHF6 total","name_es":"Demanda programada PHF6 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10149","name":"Final Hourly Schedule PHF7 total","name_es":"Demanda programada PHF7 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10151","name":"Final Hourly Schedule PHF1 Annex RD 134/2010","name_es":"Generaci\u00f3n programada PHF1 Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10152","name":"Final Hourly Schedule PHF2 Annex II RD 134/2010","name_es":"Generaci\u00f3n programada PHF2 Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10153","name":"Final Hourly Schedule PHF3 Annex II RD 134/2010","name_es":"Generaci\u00f3n programada PHF3 Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10154","name":"Final Hourly Schedule PHF4 Annex II RD 134/2010","name_es":"Generaci\u00f3n programada PHF4 Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10155","name":"Final Hourly Schedule PHF5 Annex II RD 134/2010","name_es":"Generaci\u00f3n programada PHF5 Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period because of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10156","name":"Final Hourly Schedule PHF6 Annex II RD 134/2010","name_es":"Generaci\u00f3n programada PHF6 Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10157","name":"Final Hourly Schedule PHF7 Annex II RD 134/2010","name_es":"Generaci\u00f3n programada PHF7 Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10159","name":"Final Hourly Schedule PHF1 Wind","name_es":"Generaci\u00f3n programada PHF1 E\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10160","name":"Final Hourly Schedule PHF2 Wind","name_es":"Generaci\u00f3n programada PHF2 E\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10161","name":"Final Hourly Schedule PHF3 Wind","name_es":"Generaci\u00f3n programada PHF3 E\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10162","name":"Final Hourly Schedule PHF4 Wind","name_es":"Generaci\u00f3n programada PHF4 E\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10163","name":"Final Hourly Schedule PHF5 Wind","name_es":"Generaci\u00f3n programada PHF5 E\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10164","name":"Final Hourly Schedule PHF6 Wind","name_es":"Generaci\u00f3n programada PHF6 E\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10165","name":"Final Hourly Schedule PHF7 Wind","name_es":"Generaci\u00f3n programada PHF7 E\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10169","name":"Final Hourly Schedule PHF1 Coal","name_es":"Generaci\u00f3n programada PHF1 Carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10170","name":"Final Hourly Schedule PHF2 Coal","name_es":"Generaci\u00f3n programada PHF2 Carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10171","name":"Final Hourly Schedule PHF3 Coal","name_es":"Generaci\u00f3n programada PHF3 Carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10172","name":"Final Hourly Schedule PHF4 Coal","name_es":"Generaci\u00f3n programada PHF4 Carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10173","name":"Final Hourly Schedule PHF5 Coal","name_es":"Generaci\u00f3n programada PHF5 Carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10174","name":"Final Hourly Schedule PHF6 Coal","name_es":"Generaci\u00f3n programada PHF6 Carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10175","name":"Final Hourly Schedule PHF7 Coal","name_es":"Generaci\u00f3n programada PHF7 Carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10177","name":"Final Hourly Schedule PHF1 other renewables","name_es":"Generaci\u00f3n programada PHF1 otras renovables","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10178","name":"Final Hourly Schedule PHF2 other renewables","name_es":"Generaci\u00f3n programada PHF2 otras renovables","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10179","name":"Final Hourly Schedule PHF3 Other renewables","name_es":"Generaci\u00f3n programada PHF3 otras renovables","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10180","name":"Final Hourly Schedule PHF4 Other renewables","name_es":"Generaci\u00f3n programada PHF4 otras renovables","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10181","name":"Final Hourly Schedule PHF5 Other renewables","name_es":"Generaci\u00f3n programada PHF5 otras renovables","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10182","name":"Final Hourly Schedule PHF6 Other renewables","name_es":"Generaci\u00f3n programada PHF6 otras renovables","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10183","name":"Final hourly schedule PHF7 other renewables","name_es":"Generaci\u00f3n programada PHF7 otras renovables","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10188","name":"Final Hourly Schedule PHF1 total balance interconnections","name_es":"Saldo total interconexiones programa PHF1","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10189","name":"Final Hourly Schedule PHF2 total balance interconnections","name_es":"Saldo total interconexiones programa PHF2","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10190","name":"Final Hourly Schedule PHF3 total balance interconnections","name_es":"Saldo total interconexiones programa PHF3","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10191","name":"Final Hourly Schedule PHF4 total balance interconnections","name_es":"Saldo total interconexiones programa PHF4","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10192","name":"Final Hourly Schedule PHF5 total balance interconnections","name_es":"Saldo total interconexiones programa PHF5","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10193","name":"Final Hourly Schedule PHF6 total balance interconnections","name_es":"Saldo total interconexiones programa PHF6","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10194","name":"Final Hourly Schedule PHF7 total balance interconnections","name_es":"Saldo total interconexiones programa PHF7","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10198","name":"PHF1 adjustment","name_es":"Ajuste de programas PHF1","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. The breakdown of this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10199","name":"PHF2 adjustment","name_es":"Ajuste de programas PHF2","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. The breakdown of this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10200","name":"PHF3 adjustment","name_es":"Ajuste de programas PHF3","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. The breakdown of this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10201","name":"PHF4 adjustment","name_es":"Ajuste de programas PHF4","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. The breakdown of this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10202","name":"PHF5 adjustment","name_es":"Ajuste de programas PHF5","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. The breakdown of this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10203","name":"PHF6 adjustment","name_es":"Ajuste de programas PHF6","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. The breakdown of this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10204","name":"PHF7 adjustment","name_es":"Ajuste de programas PHF7","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. The breakdown of this indicator\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10260","name":"Total Final Hourly Schedule PHF1 Generation","name_es":"Generaci\u00f3n programada PHF1 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10261","name":"Total Final Hourly Schedule PHF2 Generation","name_es":"Generaci\u00f3n programada PHF2 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10262","name":"Total Final Hourly Schedule PHF3 Generation","name_es":"Generaci\u00f3n programada PHF3 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10263","name":"Total Final Hourly Schedule PHF4 Generation","name_es":"Generaci\u00f3n programada PHF4 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10264","name":"Total Final Hourly Schedule PHF5 Generation","name_es":"Generaci\u00f3n programada PHF5 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10265","name":"Total Final Hourly Schedule PHF6 Generation","name_es":"Generaci\u00f3n programada PHF6 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10266","name":"Total Final Hourly Schedule PHF7 Generation","name_es":"Generaci\u00f3n programada PHF7 total","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows the energy\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10271","name":"Final Hourly Schedule PHFC UGH + non UGH","name_es":"Generaci\u00f3n programada PHFC UGH + no UGH","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10272","name":"Final Hourly Schedule PHFC Fuel-Gas","name_es":"Generaci\u00f3n programada PHFC Fuel-Gas","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10273","name":"Final Hourly Schedule PHFC Cogeneration","name_es":"Generaci\u00f3n programada PHFC Cogeneraci\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10274","name":"Final Hourly Schedule PHFC Waste","name_es":"Generaci\u00f3n programada PHFC Residuos","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. ts breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10275","name":"Final Hourly Schedule PHFC France balance","name_es":"Generaci\u00f3n programada PHFC Saldo Francia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10276","name":"Final Hourly Schedule PHFC Portugal balance","name_es":"Generaci\u00f3n programada PHFC Saldo Portugal","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10277","name":"Final Hourly Schedule PHFC Morocco balance","name_es":"Generaci\u00f3n programada PHFC Saldo Marruecos","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10278","name":"Final Hourly Schedule PHFC Andorra balance","name_es":"Generaci\u00f3n programada PHFC Saldo Andorra","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. This schedule is established by the SO based on the MO matching up and the program nominations of each and every\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10279","name":"Final Hourly Schedule PHFC Peninsular demand","name_es":"Demanda programada PHFC total","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10280","name":"Final Hourly Schedule PHFC Annex RD 134/2010","name_es":"Generaci\u00f3n programada PHFC Anexo II RD 134/2010","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10281","name":"Final Hourly Schedule PHFC Wind","name_es":"Generaci\u00f3n programada PHFC E\u00f3lica","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10282","name":"Final Hourly Schedule PHFC Coal","name_es":"Generaci\u00f3n programada PHFC Carb\u00f3n","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10283","name":"Final Hourly Schedule PHFC other renewables","name_es":"Generaci\u00f3n programada PHFC otras renovables","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10284","name":"Final Hourly Schedule PHFC total balance interconnections","name_es":"Saldo total interconexiones programa PHFC","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10285","name":"PHFC adjustment","name_es":"Ajuste de programas PHFC","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. The breakdown of this\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10287","name":"Total Final Hourly Schedule PHFC Generation","name_es":"Generaci\u00f3n programada PHFC total","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. Its breakdown shows\u2026","category":"Schedules","subcategory":"PHF (intraday final)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"36","name":"Viable Daily Schedule PVP Hydro UGH","name_es":"Generaci\u00f3n programada PVP Hidr\u00e1ulica UGH","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"37","name":"Viable Daily Schedule PVP Hydro non UGH","name_es":"Generaci\u00f3n programada PVP Hidr\u00e1ulica no UGH","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"38","name":"Viable Daily Schedule PVP Turbine pumping","name_es":"Generaci\u00f3n programada PVP Turbinaci\u00f3n bombeo","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"39","name":"Viable Daily Schedule PVP Nuclear","name_es":"Generaci\u00f3n programada PVP Nuclear","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"40","name":"Viable Daily Schedule PVP Soft coal/Anthracite Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PVP Hulla antracita Anexo II RD 134/2010","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"41","name":"Viable Daily Schedule PVP Sub-bituminous coal Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PVP Hulla sub-bituminosa Anexo II RD 134/2010","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"42","name":"Viable Daily Schedule PVP Soft coal/Anthracite","name_es":"Generaci\u00f3n programada PVP Hulla antracita","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"43","name":"Viable Daily Schedule PVP Sub-bituminous coal","name_es":"Generaci\u00f3n programada PVP Hulla sub-bituminosa","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"44","name":"Viable Daily Schedule PVP Combined cycle GT","name_es":"Generaci\u00f3n programada PVP Ciclo combinado","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"45","name":"Viable Daily Schedule PVP Fuel","name_es":"Generaci\u00f3n programada PVP Fuel","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"46","name":"Viable Daily Schedule PVP Natural Gas - Steam Turbine","name_es":"Generaci\u00f3n programada PVP Gas Natural - Turbina de vapor","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"47","name":"Viable Daily Schedule PVP Onshore wind","name_es":"Generaci\u00f3n programada PVP E\u00f3lica terrestre","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"48","name":"Viable Daily Schedule PVP Offshore wind","name_es":"Generaci\u00f3n programada PVP E\u00f3lica marina","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"49","name":"Viable Daily Schedule PVP Solar PV","name_es":"Generaci\u00f3n programada PVP Solar fotovoltaica","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"50","name":"Viable Daily Schedule PVP Solar thermal","name_es":"Generaci\u00f3n programada PVP Solar t\u00e9rmica","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"51","name":"Viable Daily Schedule PVP Geothermal and Ocean","name_es":"Generaci\u00f3n programada PVP Oc\u00e9ano y geot\u00e9rmica","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"52","name":"Viable Daily Schedule PVP Natural Gas Cogeneration","name_es":"Generaci\u00f3n programada PVP Gas Natural Cogeneraci\u00f3n","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"53","name":"Viable Daily Schedule PVP Fossil Oil","name_es":"Generaci\u00f3n programada PVP Derivados del petr\u00f3leo \u00f3 carb\u00f3n","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"54","name":"Viable Daily Schedule PVP Mining subproducts","name_es":"Generaci\u00f3n programada PVP Subproductos miner\u00eda","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"55","name":"Viable Daily Schedule PVP Residual energy","name_es":"Generaci\u00f3n programada PVP Energ\u00eda residual","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"56","name":"Viable Daily Schedule PVP Biomass","name_es":"Generaci\u00f3n programada PVP Biomasa","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"57","name":"Viable Daily Schedule PVP Biogas","name_es":"Generaci\u00f3n programada PVP Biog\u00e1s","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"58","name":"Viable Daily Schedule PVP Household and similar wastes","name_es":"Generaci\u00f3n programada PVP Residuos dom\u00e9sticos y similares","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"59","name":"Viable Daily Schedule PVP Sundry waste","name_es":"Generaci\u00f3n programada PVP Residuos varios","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"60","name":"Viable Daily Schedule PVP Pump consumption","name_es":"Generaci\u00f3n programada PVP Consumo bombeo","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"62","name":"Viable Daily Schedule PVP Generic","name_es":"Generaci\u00f3n programada PVP Gen\u00e9ricas","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"63","name":"Viable Daily Schedule PVP Import France","name_es":"Generaci\u00f3n programada PVP Importaci\u00f3n Francia","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"64","name":"Viable Daily Schedule PVP Import Portugal","name_es":"Generaci\u00f3n programada PVP Importaci\u00f3n Portugal","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"65","name":"Viable Daily Schedule PVP Import Morocco","name_es":"Generaci\u00f3n programada PVP Importaci\u00f3n Marruecos","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"66","name":"Viable Daily Schedule PVP Import Andorra","name_es":"Generaci\u00f3n programada PVP Importaci\u00f3n Andorra","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"67","name":"Viable Daily Schedule PVP Export France","name_es":"Generaci\u00f3n programada PVP Exportaci\u00f3n Francia","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"68","name":"Viable Daily Schedule PVP Export Portugal","name_es":"Generaci\u00f3n programada PVP Exportaci\u00f3n Portugal","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"69","name":"Viable Daily Schedule PVP Export Morocco","name_es":"Generaci\u00f3n programada PVP Exportaci\u00f3n Marruecos","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"70","name":"Viable Daily Schedule PVP Export Andorra","name_es":"Generaci\u00f3n programada PVP Exportaci\u00f3n Andorra","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"360","name":"Scheduled demand PVP Market direct consumption","name_es":"Demanda programada PVP Consumos directos en mercado","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"361","name":"Scheduled demand PVP Aux. Svcs. Consumption","name_es":"Demanda programada PVP Consumo de Servicios Auxiliares","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"362","name":"Scheduled demand PVP Wind adjustment","name_es":"Demanda programada PVP Correcci\u00f3n e\u00f3lica","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"363","name":"Scheduled demand PVP Solar adjustment","name_es":"Demanda programada PVP Correcci\u00f3n solar","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"364","name":"Scheduled demand PVP REE adjustment","name_es":"Demanda programada PVP Correcci\u00f3n REE","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2141","name":"Scheduled Generation PVP Hybridization","name_es":"Generaci\u00f3n programada PVP Hibridaci\u00f3n","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the programming units with Hybridization generation. Publication: every hour at around minute 15 with the information of day\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10065","name":"Viable Daily Schedule PVP UGH + non UGH","name_es":"Generaci\u00f3n programada PVP UGH + no UGH","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10078","name":"Viable Daily Schedule PVP Fuel-Gas","name_es":"Generaci\u00f3n programada PVP Fuel-Gas","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10087","name":"Viable Daily Schedule PVP Cogeneration","name_es":"Generaci\u00f3n programada PVP Cogeneraci\u00f3n","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10096","name":"Viable Daily Schedule PVP Waste","name_es":"Generaci\u00f3n programada PVP Residuos","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10105","name":"Viable Daily Schedule PVP France balance","name_es":"Generaci\u00f3n programada PVP Saldo Francia","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10114","name":"Viable Daily Schedule PVP Portugal balance","name_es":"Generaci\u00f3n programada PVP Saldo Portugal","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10123","name":"Viable Daily Schedule PVP Morocco balance","name_es":"Generaci\u00f3n programada PVP Saldo Marruecos","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10132","name":"Viable Daily Schedule PVP Andorra balance","name_es":"Generaci\u00f3n programada PVP Saldo Andorra","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10142","name":"Scheduled demand PVP total","name_es":"Demanda programada PVP total","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10150","name":"Viable Daily Schedule PVP Anexo II RD 134/2010","name_es":"Generaci\u00f3n programada PVP Anexo II RD 134/2010","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10158","name":"Viable Daily Schedule PVP Wind","name_es":"Generaci\u00f3n programada PVP E\u00f3lica","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10168","name":"Viable Daily Schedule PVP Coal","name_es":"Generaci\u00f3n programada PVP Carb\u00f3n","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10176","name":"Viable Daily Schedule PVP Other renewables","name_es":"Generaci\u00f3n programada PVP otras renovables","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10187","name":"Viable Daily Schedule PVP total balance interconnections","name_es":"Saldo total interconexiones programa PVP","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10197","name":"PVP adjustment","name_es":"Ajuste de programas PVP","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10259","name":"Total Viable Daily Schedule Generation PVP","name_es":"Generaci\u00f3n programada PVP total","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Schedules","subcategory":"PVP (viable)","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"709","name":"Cost of the solution of technical constraints","name_es":"Coste de soluci\u00f3n de Restricciones t\u00e9cnicas diario","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"714","name":"Replacement Reserves charge rights","name_es":"Derechos de Cobro de las necesidades cubiertas de energ\u00edas de balance RR","description":"Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in the European\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"716","name":"mFRR satisfied needs charge rights","name_es":"Derechos de Cobro de las necesidades cubiertas de energ\u00edas mFRR","description":"The tertiary regulation corresponds to the European standard manual frequency restoration reserves (mFRR) product. It is a balance service for activating active power reserves that aims to maintain the frequency and generation-demand balance of the system and allows the restoration of the use of\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"718","name":"aFRR Energy collection rights","name_es":"Derechos de cobro por energ\u00eda de regulaci\u00f3n secundaria","description":"The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation\u2013demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"726","name":"Cost of excess production imbalances","name_es":"Coste de los desv\u00edos medidos de mayor producci\u00f3n","description":"The measured imbalances are the difference between the scheduled energy and the measured energy. The imbalances price is calculated in accordance to the O.P. 14.4. In particular, this indicator refers to the deviation cost when it is generated more than scheduled. Publication: daily at 7:45 with\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"727","name":"Cost of production deficit imbalances","name_es":"Coste de los desv\u00edos medidos de menor producci\u00f3n","description":"The measured imbalances are the difference between the scheduled energy and the measured energy. The imbalances price is calculated in accordance to the O.P. 14.4. In particular, this indicator refers to the deviation cost when it is generated less than scheduled. Publication: daily at 7:45 with\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"768","name":"Income/Cost Unitary for the demand due to imbalances excess/deficit","name_es":"Ingreso/Coste unitario para la demanda por el excedente/d\u00e9ficit de los desv\u00edos","description":"Is the result of dividing the demand by the resulting balance of adding the energies managed finally in every system ancillary services with the energy used in the calculation of the measured imbalances price. This energy is calculated as the total energy balance from Replacement Reserves (RR),\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"769","name":"Capacity payment 2.0.A rate","name_es":"Pagos por capacidad tarifa 2.0.A","description":"The Capacity Payments consist on, a payment regulated to finance the power capacity service at medium and long-term offered by the generation facilities to the electrical systems. This concept regulated is included on the Energy Term. In particular, this indicator refers to the capacity payments\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"771","name":"Capacity payment 3.0A rate","name_es":"Pagos por capacidad tarifa 3.0A","description":"The Capacity Payments consist on, a payment regulated to finance the power capacity service at medium and long-term offered by the generation facilities to the electrical systems. This concept regulated is included on the Energy Term. In particular, this indicator refers to the capacity payments\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"772","name":"Capacity payment 3.1A rate","name_es":"Pagos por capacidad tarifa 3.1A","description":"The Capacity Payments consist on, a payment regulated to finance the power capacity service at medium and long-term offered by the generation facilities to the electrical systems. This concept regulated is included on the Energy Term. In particular, this indicator refers to the capacity payments\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"773","name":"Capacity payment six periods rate","name_es":"Pagos por capacidad tarifa seis periodos","description":"The Capacity Payments consist on, a payment regulated to finance the power capacity service at medium and long-term offered by the generation facilities to the electrical systems. This concept regulated is included on the Energy Term. In particular, this indicator refers to the capacity payments\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"775","name":"Capacity payment 2.1A rate","name_es":"Pagos por capacidad tarifa 2.1A","description":"The Capacity Payments consist on, a payment regulated to finance the power capacity service at medium and long-term offered by the generation facilities to the electrical systems. This concept regulated is included on the Energy Term. In particular, this indicator refers to the capacity payments\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"778","name":"Capacity payment average price charged to demand","name_es":"Precio medio pagos por capacidad para demanda","description":"The Capacity Payments consist on, a payment regulated to finance the power capacity service at medium and long-term offered by the generation facilities to the electrical systems. This concept regulated is included on the Energy Term. In particular, this indicator refers to the demand capacity\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"820","name":"Monthly final energy quota","name_es":"Energ\u00eda mensual final cuota","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the percentage of energy on\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"823","name":"Final annual energy quota","name_es":"Energ\u00eda anual final cuota","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the percentage of energy on\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1000","name":"Final settlement","name_es":"Cierre liquidaci\u00f3n","description":"Is the closure associated to the settlement data published for a certain date. Its temporary grouping is monthly so it is always shown a unique value per month, that can be negative when the settlement closure is advance or positive when the closing is definitive. For example for a month with\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1038","name":"Monthly income balance(MIB)","name_es":"Ingresos mensuales de balance (IMB)","description":"Monthly amount resulting from deviation settlement of the generation respect the demand. Publication: monthly before day 28 at 12:00 hours for month M-3.","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1136","name":"Transport losses","name_es":"P\u00e9rdidas de transporte","description":"Energy loss in the movement of the generation points to the transport network. Publication: daily every time that new measures arrive from month M+1.","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1137","name":"Distribution losses","name_es":"P\u00e9rdidas de distribuci\u00f3n","description":"Energy loss in the movement from the transport network to final clients. Publication: daily every time new measures arrive from month M+8.","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1373","name":"Cost of solution of PBF technical constrainst phase I upward","name_es":"Coste de soluci\u00f3n de restricciones t\u00e9cnicas diario Fase I subir","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Units\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1374","name":"Cost of solution of PBF technical constrainst phase I downward","name_es":"Coste de soluci\u00f3n de restricciones t\u00e9cnicas diario Fase I bajar","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Units\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1375","name":"Cost of solution of PBF technical constrainst phase II upward","name_es":"Coste de soluci\u00f3n de restricciones t\u00e9cnicas diario Fase II subir","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Units\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1376","name":"Cost of solution of PBF technical constrainst phase II downward","name_es":"Coste de soluci\u00f3n de restricciones t\u00e9cnicas diario Fase II bajar","description":"Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Units\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1725","name":"Restricted energy with collection rights for Real Time Upward Technical Constraints","name_es":"Energ\u00eda limitada con derechos de cobro por restricciones en tiempo real a subir","description":"The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1932","name":"Active demand response service charge rights","name_es":"Derechos de cobro de la activaci\u00f3n del servicio de respuesta activa de la demanda","description":"Active demand response service is a specific balance service of Spanish Electrical System that aims to deal with situations of shortage of upward balancing reserves by obtaining resources in addition to those already available through the use of standard European balancing services. This service\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2108","name":"Forward market adjustment term","name_es":"T\u00e9rmino de ajuste de mercados a plazo","description":"Concept that is part of the active energy billing term of the PVPC, which is the hourly price of the energy term that is applied to the electricity bill of consumers with a contracted power of no more than 10 kW and who are covered by the PVPC (Voluntary Price). for the Small Consumer).\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2277","name":"Offered capacity in the annual forward explicit auction with France, import direction","name_es":"Capacidad ofrecida subasta expl\u00edcita anual anticipada con Francia sentido importador","description":"Offered capacity in the annual forward explicit auction with France, import direction (CSAAFI)","category":"Settlement","subcategory":"Costs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2278","name":"Offered capacity in the annual forward explicit auction with France, export direction","name_es":"Capacidad ofrecida subasta exp\u00ed\u00adcita anual anticipada con Francia sentido exportador","description":"Offered capacity in the annual forward explicit auction with France, export direction (CSAAFE)","category":"Settlement","subcategory":"Costs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2279","name":"Participants in the annual explicit forward auction with France, importing direction","name_es":"Participantes en subasta expl\u00edcita anual anticipada con Francia sentido importador","description":"Participants in the annual explicit forward auction with France, importing direction (PSAAFI)","category":"Settlement","subcategory":"Costs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2280","name":"Participants in the annual explicit forward auction with France, exporting direction","name_es":"Participantes en subasta expl\u00edcita anual anticipada con Francia sentido exportador","description":"Participants in the annual explicit forward auction with France, exporting direction (PSAAFE)","category":"Settlement","subcategory":"Costs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2281","name":"Successful participants in the annual explicit forward auction with France, importing direction","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita anual anticipada con Francia sentido importador","description":"Successful participants in the annual explicit forward auction with France, importing direction (PASAAFI)","category":"Settlement","subcategory":"Costs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2282","name":"Successful participants in the annual explicit forward auction with France, exporting direction","name_es":"Participantes Adjudicatarios en subasta expl\u00edcita anual anticipada con Francia sentido exportador","description":"Successful participants in the annual explicit forward auction with France, exporting direction (PASAAFE)","category":"Settlement","subcategory":"Costs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2283","name":"Capacity allocated in the annual explicit forward auction with France, importing direction","name_es":"Capacidad asignada en subasta expl\u00ed\u00adcita anual anticipada con Francia sentido importador","description":"Capacity allocated in the annual explicit forward auction with France, importing direction (CASAAFI)","category":"Settlement","subcategory":"Costs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2284","name":"Capacity allocated in the annual explicit forward auction with France, exporting direction","name_es":"Capacidad asignada en subasta expl\u00ed\u00adcita anual anticipada con Francia sentido exportador","description":"Capacity allocated in the annual explicit forward auction with France, exporting direction (CASAAFE)","category":"Settlement","subcategory":"Costs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2285","name":"Price of the annual explicit forward auction with France, importing direction","name_es":"Precio de subasta expl\u00edcita anual anticipada con Francia sentido importador","description":"Price of the annual explicit forward auction with France, importing direction (PRSAAFI)","category":"Settlement","subcategory":"Costs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2286","name":"Price of the annual explicit forward auction with France, exporting direction","name_es":"Precio de subasta expl\u00edcita anual anticipada con Francia sentido exportador","description":"Price of the annual explicit forward auction with France, exporting direction (PRSAAFE)","category":"Settlement","subcategory":"Costs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10058","name":"Consumption demand generation-losses difference","name_es":"Demanda en consumo diferencia generaci\u00f3n - p\u00e9rdidas","description":"Demand calculated as the difference between the generation measures and the transport losses. The breakdown of this indicator provides the detail of the generation measures for each production type and the transport losses. It is possible also to obtain the information at province level.\u2026","category":"Settlement","subcategory":"Costs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"856","name":"Hourly final energy electric system consumers","name_es":"Energ\u00eda horaria final ","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"934","name":"Monthly final energy","name_es":"Energ\u00eda mensual final","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1184","name":"No. Border points Distribution - Distribution","name_es":"N\u00ba Puntos Frontera Distribuci\u00f3n - Distribuci\u00f3n","description":"The border points of the measurement system are the electrical system places where it is necessary to install equipment to measure the energy transaction performed on them. The border points can be classified, thus, by the activities on both sides of them. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1185","name":"No. Border points Distribution - Transport","name_es":"N\u00ba Puntos Frontera Distribuci\u00f3n - Transporte","description":"The border points of the measurement system are the electrical system places where it is necessary to install equipment to measure the energy transaction performed on them. The border points can be classified, thus, by the activities on both sides of them. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1186","name":"No. Border points E.R. Generation - Transport","name_es":"N\u00ba Puntos Frontera Generaci\u00f3n RE - Transporte","description":"The border points of the measurement system are the electrical system places where it is necessary to install equipment to measure the energy transaction performed on them. The border points can be classified, thus, by the activities on both sides of them. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1187","name":"No. Border points E.R. Generation - Distribution","name_es":"N\u00ba Puntos Frontera Generaci\u00f3n RE - Distribuci\u00f3n","description":"The border points of the measurement system are the electrical system places where it is necessary to install equipment to measure the energy transaction performed on them. The border points can be classified, thus, by the activities on both sides of them. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1188","name":"No. Border points Conventional Generation - Distribution","name_es":"N\u00ba Puntos Frontera Generaci\u00f3n RO - Distribuci\u00f3n","description":"The border points of the measurement system are the electrical system places where it is necessary to install equipment to measure the energy transaction performed on them. The border points can be classified, thus, by the activities on both sides of them. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1189","name":"No. Border points Conventional Generation - Transport","name_es":"N\u00ba Puntos Frontera Generaci\u00f3n RO - Transporte","description":"The border points of the measurement system are the electrical system places where it is necessary to install equipment to measure the energy transaction performed on them. The border points can be classified, thus, by the activities on both sides of them. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1190","name":"No. Border points Transport - International","name_es":"N\u00ba Puntos Frontera Transporte - Internacional","description":"The border points of the measurement system are the electrical system places where it is necessary to install equipment to measure the energy transaction performed on them. The border points can be classified, thus, by the activities on both sides of them. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1191","name":"Number of clients > 450 kW without hourly discrimination","name_es":"N\u00ba de Clientes > 450 kW discriminaci\u00f3n horaria Sin discriminaci\u00f3n horaria","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with tariff hourly discrimination. Without hourly discrimination. This indicator can be broken down by provinces. Publication: daily at around 3:30 with the\u2026","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1200","name":"Measured demand without voltage level","name_es":"Demanda medida nivel de tensi\u00f3n Sin nivel tensi\u00f3n","description":"Consumption measures depending on the voltage level. In particular, this indicator refers to the consumption measures without voltage level. Publication: daily every time new measures arrive from month M+8.","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1201","name":"Measured demand by voltage level - E0 low voltage","name_es":"Demanda medida nivel de tensi\u00f3n E0 Baja tensi\u00f3n","description":"Consumption measures depending on the voltage level. In particular, this indicator refers to the consumption measures for the voltage level E0 low voltage. Publication: daily every time new measures arrive from month M+8.","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1202","name":"Measured demand by voltage level E1 >= 1 kV y < 14 kV","name_es":"Demanda medida nivel de tensi\u00f3n E1 >= 1 kV y < 14 kV","description":"Consumption measures depending on the voltage level. In particular, this indicator refers to the consumption measures for the voltage level E1 >= 1 kV and Publication: daily every time new measures arrive from month M+8.","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1203","name":"Measured demand by voltage level E2 >= 14 kV y < 36 kV","name_es":"Demanda medida nivel de tensi\u00f3n E2 >= 14 kV y < 36 kV","description":"Consumption measures depending on the voltage level. In particular, this indicator refers to the consumption measures for the voltage level E2 >= 14 kV and Publication: daily every time new measures arrive from month M+8.","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1204","name":"Measured demand by voltage level E3 >= 36 kV y < 72.5 kV","name_es":"Demanda medida nivel de tensi\u00f3n E3 >= 36 kV y < 72.5 kV","description":"Consumption measures depending on the voltage level. In particular, this indicator refers to the consumption measures for the voltage level E3 >= 36 kV and Publication: daily every time new measures arrive from month M+8.","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1205","name":"Measured demand by voltage level E4 >= 72.5 kV y < 145 kV","name_es":"Demanda medida nivel de tensi\u00f3n E4 >= 72.5 kV y < 145 kV","description":"Consumption measures depending on the voltage level. In particular, this indicator refers to the consumption measures for the voltage level E4 >= 72.5 kV and Publication: daily every time new measures arrive from month M+8.","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1206","name":"Measured demand by voltage level E5 >= 145 kV y < 220 kV","name_es":"Demanda medida nivel de tensi\u00f3n E5 >= 145 kV y < 220 kV","description":"Consumption measures depending on the voltage level. In particular, this indicator refers to the consumption measures for the voltage level E5 >= 145 kV and Publication: daily every time new measures arrive from month M+8.","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1207","name":"Measured demand by voltage level E6 >= 220 kV","name_es":"Demanda medida nivel de tensi\u00f3n E6 >= 220 kV","description":"Consumption measures depending on the voltage level. In particular, this indicator refers to the consumption measures for the voltage level E6 >= 220 kV. Publication: daily every time new measures arrive from month M+8.","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1208","name":"Measured demand by access rate without access rate","name_es":"Demanda medida tarifa de acceso Sin tarifa de acceso","description":"The access rate is the rate paid by the Trading company to the Distribution company for the use of the energy distribution network. Is a tariff fixed by the Government paid by the client through its Trading company when a rate is contracted in free market. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1216","name":"Measured demand by access rate 6.2 >= 30 KV and < 72.5 KV","name_es":"Demanda medida tarifa de acceso 6.2 >= 30 KV Y < 72.5 KV","description":"The access rate is the rate paid by the Trading company to the Distribution company for the use of the energy distribution network. Is a tariff fixed by the Government paid by the client through its Trading company when a rate is contracted in free market. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1217","name":"Measured demand by access rate 6.3 >= 72.5 KV and < 145 KV","name_es":"Demanda medida tarifa de acceso 6.3 >= 72.5 KV Y < 145 KV","description":"The access rate is the rate paid by the Trading company to the Distribution company for the use of the energy distribution network. Is a tariff fixed by the Government paid by the client through its Trading company when a rate is contracted in free market. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1218","name":"Measured demand by access rate 6.4 >= 145 KV","name_es":"Demanda medida tarifa de acceso 6.4 >= 145 KV","description":"The access rate is the rate paid by the Trading company to the Distribution company for the use of the energy distribution network. Is a tariff fixed by the Government paid by the client through its Trading company when a rate is contracted in free market. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1235","name":"Number of clients > 450 kW G0 hourly discrimination HV general","name_es":"N\u00ba de Clientes > 450 kW discriminaci\u00f3n horaria G0 GENERAL ALTA TENSI\u00d3N","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with hourly discrimination rate G0 GENERAL HIGH VOLTAGE. This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information\u2026","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1238","name":"Number of clients > 450 kW E3 hourly discrimination three periods rate","name_es":"N\u00ba de Clientes > 450 kW discriminaci\u00f3n horaria E3 TARIFA DE TRES PERIODOS","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with hourly discrimination rate E3 THREE PERIODS RATE. This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of\u2026","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1240","name":"Number of clients > 450 kW without voltage level","name_es":"N\u00ba de Clientes > 450 kW nivel de tensi\u00f3n Sin nivel tensi\u00f3n","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate level voltage Without voltage level. This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1241","name":"Number of clients > 450 kW voltage level - E0 low voltage","name_es":"N\u00ba de Clientes > 450 kW nivel de tensi\u00f3n E0 Baja tensi\u00f3n","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate voltage level E0 Low voltage. This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1242","name":"Number of clients > 450 kW voltage level E1 >= 1 kV y < 14 kV","name_es":"N\u00ba de Clientes > 450 kW nivel de tensi\u00f3n E1 >= 1 kV y < 14 kV","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate level voltage E1 >= 1 kV and This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1243","name":"Number of clients > 450 kW voltage level E2 >= 14 kV y < 36 kV","name_es":"N\u00ba de Clientes > 450 kW nivel de tensi\u00f3n E2 >= 14 kV y < 36 kV","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate voltage level E2 >= 14 kV and This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1244","name":"Number of clients > 450 kW voltage level E3 >= 36 kV y < 72.5 kV","name_es":"N\u00ba de Clientes > 450 kW nivel de tensi\u00f3n E3 >= 36 kV y < 72.5 kV","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate voltage level E3 >= 36 kV and This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1245","name":"Number of clients > 450 kW voltage level E4 >= 72.5 kV y < 145 kV","name_es":"N\u00ba de Clientes > 450 kW nivel de tensi\u00f3n E4 >= 72.5 kV y < 145 kV","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate voltage level E4 >= 72.5 kV and This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1246","name":"Number of clients > 450 kW voltage level E5 >= 145 kV y < 220 kV","name_es":"N\u00ba de Clientes > 450 kW nivel de tensi\u00f3n E5 >= 145 kV y < 220 kV","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate voltage level E5 >= 145 kV and This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1247","name":"Number of clients > 450 kW voltage level E6 >= 220 kV","name_es":"N\u00ba de Clientes > 450 kW nivel de tensi\u00f3n E6 >= 220 kV","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate voltage level E6 >= 220 kV. This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1248","name":"Number of clients > 450 kW without access rate","name_es":"N\u00ba de Clientes > 450 kW tarifa de acceso Sin tarifa de acceso","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with access rate Without access rate This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1256","name":"Number of clients > 450 kW access rate 6.2 >= 30 KV and < 72.5 KV","name_es":"N\u00ba de Clientes > 450 kW tarifa de acceso 6.2 >= 30 KV Y < 72.5 KV","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate voltage level 6.2 >= 30 KV AND < 72.5 KV. This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of\u2026","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1257","name":"Number of clients > 450 kW access rate 6.3 >= 72.5 KV and < 145 KV","name_es":"N\u00ba de Clientes > 450 kW tarifa de acceso 6.3 >= 72.5 KV Y < 145 KV","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate voltage level 6.3 >= 72.5 KV AND This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1258","name":"Number of clients > 450 kW access rate 6.4 >= 145 KV","name_es":"N\u00ba de Clientes > 450 kW tarifa de acceso 6.4 >= 145 KV","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate level voltage 6.4 >= 145 KV. This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1369","name":"Measured demand by access rate 6.1A >= 1 KV Y < 30 KV","name_es":"Demanda medida tarifa de acceso 6.1A >= 1 KV Y < 30 KV","description":"The access rate is the rate paid by the Trading company to the Distribution company for the use of the energy distribution network. Is a tariff fixed by the Government paid by the client through its Trading company when a rate is contracted in free market. In particular, this indicator refers to\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1371","name":"Number of clients > 450 kW access rate 6.1A >= 1 KV Y < 30 KV","name_es":"N\u00ba de Clientes > 450 kW tarifa de acceso 6.1A >= 1 KV Y < 30 KV","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with rate level voltage 6.1A >= 1 KV AND This indicator can be broken down by provinces. Publication: daily at around 3:30 with the information of day D.","category":"Settlement","subcategory":"Metering","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10268","name":"Measured demand total by access rate","name_es":"Demanda medida tarifa de acceso total","description":"The access rate is the rate paid by the Trading company to the Distribution company for the use of the energy distribution network. Is a tariff fixed by the Government paid by the client through its Trading company when a rate is contracted in free market. The breakdown of this indicator provides\u2026","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10269","name":"Measured demand total by voltage level","name_es":"Demanda medida nivel de tensi\u00f3n total","description":"Consumption measures depending on the voltage level. The breakdown of this indicator provides the detail of the consumption measures for the different voltage level types. Publication: daily every time new measures arrive from month M+8.","category":"Settlement","subcategory":"Metering","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"351","name":"Scheduled demand PBF Competitive suppliers","name_es":"Demanda programada PBF Comercializadores mercado libre","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Competitive suppliers programming units. This schedule is established by\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"352","name":"Scheduled demand PBF Suppliers of last resort","name_es":"Demanda programada PBF Comercializadores de referencia","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Suppliers of last resort programming units. This schedule is established\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"358","name":"Scheduled demand PVP Competitive suppliers","name_es":"Demanda programada PVP Comercializadores mercado libre","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"359","name":"Scheduled demand PVP Suppliers of last resort","name_es":"Demanda programada PVP Comercializadores de referencia","description":"Energy corresponding to the daily schedule, with breakdown by scheduling periods, which incorporates the modifications introduced in the Base Daily Operating Schedule for the resolution of the technical constraints identified by security criteria and for the subsequent rebalancing\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"365","name":"Scheduled demand P48 Competitive suppliers","name_es":"Demanda programada P48 Comercializadores mercado libre","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Competitive suppliers programming units. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"366","name":"Scheduled demand P48 Suppliers of last resort","name_es":"Demanda programada P48 Comercializadores de referencia","description":"Energy corresponding to the operative program that each SO establishes in each period till the end of the daily scheduling horizon. In particular, this indicator refers to the Suppliers of last resort programming units. Publication: every hour at around minute 15 with the information of day D. At\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"372","name":"Final Hourly Schedule PHF1 Competitive suppliers","name_es":"Demanda programada PHF1 Comercializadores mercado libre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"373","name":"Final Hourly Schedule PHF1 Suppliers of last resort","name_es":"Demanda programada PHF1 Comercializadores de referencia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"379","name":"Final Hourly Schedule PHF2 Competitive suppliers","name_es":"Demanda programada PHF2 Comercializadores mercado libre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"380","name":"Final Hourly Schedule PHF2 Suppliers of last resort","name_es":"Demanda programada PHF2 Comercializadores de referencia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"386","name":"Final Hourly Schedule PHF3 Competitive suppliers","name_es":"Demanda programada PHF3 Comercializadores mercado libre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"387","name":"Final Hourly Schedule PHF3 Suppliers of last resort","name_es":"Demanda programada PHF3 Comercializadores de referencia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"393","name":"Final Hourly Schedule PHF4 Competitive suppliers","name_es":"Demanda programada PHF4 Comercializadores mercado libre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"394","name":"Final Hourly Schedule PHF4 Suppliers of last resort","name_es":"Demanda programada PHF4 Comercializadores de referencia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"400","name":"Final Hourly Schedule PHF5 Competitive suppliers","name_es":"Demanda programada PHF5 Comercializadores mercado libre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"401","name":"Final Hourly Schedule PHF5 Suppliers of last resort","name_es":"Demanda programada PHF5 Comercializadores de referencia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"407","name":"Final Hourly Schedule PHF6 Competitive suppliers","name_es":"Demanda programada PHF6 Comercializadores mercado libre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"408","name":"Final Hourly Schedule PHF6 Suppliers of last resort","name_es":"Demanda programada PHF6 Comercializadores de referencia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"414","name":"Final Hourly Schedule PHF7 Competitive suppliers","name_es":"Demanda programada PHF7 Comercializadores mercado libre","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"415","name":"Final Hourly Schedule PHF7 Suppliers of last resort","name_es":"Demanda programada PHF7 Comercializadores de referencia","description":"Energy corresponding to the scheduling established by the SO after each intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this indicator\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"457","name":"Last resort suppiler PBF energy traded on bilateral contracts","name_es":"Programa bilateral PBF Comercializaci\u00f3n \u00daltimo Recurso","description":"Is the daily energy schedule, with hourly breakdown, of the different Programming Units corresponding to the sale and purchase of energy in the Spanish peninsular electrical system. In particular, this indicator refers to the Last Resort Supplier programming units. This schedule is established by\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"779","name":"Quarter-hourly average price day ahead market last resort suppliers component","name_es":"Precio medio cuarto horario componente mercado diario comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of day ahead market within the weighted average quarter-hourly energy price for the consumer type last resort\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"780","name":"Quarter-hourly average price PBF technical constraints last resort suppliers component","name_es":"Precio medio cuarto horario componente restricciones PBF comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of PBF technical constraints within the weighted average quarter-hourly energy price for the consumer type last\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"781","name":"Quarter-hourly average price real time technical constraints last resort suppliers component","name_es":"Precio medio cuarto horario componente restricciones tiempo real comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of real time technical constraints within the weighted average quarter-hourly energy price for the consumer type\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"782","name":"Quarter-hourly average price intraday market last resort suppliers component","name_es":"Precio medio cuarto horario componente mercado intradiario comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of intraday market within the weighted average quarter-hourly energy price for the consumer type last resort\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"783","name":"Hourly average price intraday market tech. constraints last resort suppliers component","name_es":"Precio medio horario componente restricciones intradiario comercializadores de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"784","name":"Hourly average price Upward reserve power last resort suppliers component","name_es":"Precio medio horario componente reserva de potencia adicional a subir comercializadores de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the upwards power reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"785","name":"Quarter-hourly average price secondary reserve last resort suppliers component","name_es":"Precio medio cuarto horario componente banda secundaria comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of secondary reserve within the weighted average quarter-hourly energy price for the consumer type last resort\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"786","name":"Quarter-hourly average price imbalances last resort suppliers component","name_es":"Precio medio cuarto horario componente desv\u00edos comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of imbalances within the weighted average quarter-hourly energy price for the consumer type last resort suppliers.\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"787","name":"Quarter-hourly average price imbalances net value last resort suppliers component","name_es":"Precio medio cuarto horario componente saldo desv\u00edos comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of imbalances net value within the weighted average quarter-hourly energy price for the consumer type last resort\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"788","name":"Quarter-hourly average price capacity payments last resort suppliers component","name_es":"Precio medio cuarto horario componente pagos capacidad comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of capacity payments within the weighted average quarter-hourly energy price for the consumer type last resort\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"789","name":"Quarter-hourly average price P.O.14.6 balance last resort suppliers component","name_es":"Precio medio cuarto horario componente saldo P. O.14. 6 comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of P. O.14.6 balance within the weighted average quarter-hourly energy price for the consumer type last resort\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"790","name":"Hourly average price Generic Units Nom. Failure last resort suppliers component","name_es":"Precio medio horario componente fallo nominaci\u00f3n UPG comercializadores de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the Generic Programming Units\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"791","name":"Quarter-hourly average price final last resort suppliers","name_es":"Precio medio cuarto horario final comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the weighted average quarter-hourly price of energy for the consumer type last resort suppliers. For dates prior to January 1,\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"792","name":"Quarter-hourly average price day ahead market competitive suppliers component","name_es":"Precio medio cuarto horario componente mercado diario contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of day ahead market within the weighted average quarter-hourly energy price for the consumer type competitive\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"793","name":"Quarter-hourly average price PBF technical constraints competitive suppliers component","name_es":"Precio medio cuarto horario componente restricciones PBF contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of PBF technical constraints within the weighted average quarter-hourly energy price for the consumer type\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"794","name":"Quarter-hourly average price real time technical constraints competitive suppliers component","name_es":"Precio medio cuarto horario componente restricciones tiempo real contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of real time technical constraints within the weighted average quarter-hourly energy price for the consumer type\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"795","name":"Quarter-hourly average price intraday market competitive suppliers component","name_es":"Precio medio cuarto horario componente mercado intradiario contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of intraday market within the weighted average quarter-hourly energy price for the consumer type competitive\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"796","name":"Hourly average price intraday market tech. constraints competitive suppliers component","name_es":"Precio medio horario componente restricciones intradiario contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"797","name":"Hourly average price Upward reserve power competitive suppliers component","name_es":"Precio medio horario componente reserva de potencia adicional a subir contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the upwards power reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"798","name":"Quarter-hourly average price secondary reserve competitive suppliers component","name_es":"Precio medio cuarto horario componente banda secundaria contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of secondary reserve within the weighted average quarter-hourly energy price for the consumer type competitive\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"799","name":"Quarter-hourly average price imbalances competitive suppliers component","name_es":"Precio medio cuarto horario componente desv\u00edos contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of imbalances within the weighted average quarter-hourly energy price for the consumer type competitive suppliers.\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"800","name":"Quarter-hourly average price imbalances net value competitive suppliers component","name_es":"Precio medio cuarto horario componente saldo desv\u00edos contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of imbalances net value within the weighted average quarter-hourly energy price for the consumer type competitive\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"801","name":"Quarter-hourly average price capacity payments competitive suppliers component","name_es":"Precio medio cuarto horario componente pagos capacidad contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of capacity payments within the weighted average quarter-hourly energy price for the consumer type competitive\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"802","name":"Quarter-hourly average price P.O.14.6 balance competitive suppliers component","name_es":"Precio medio cuarto horario componente saldo P.O.14.6. contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of P.O.14.6 balance within the weighted average quarter-hourly energy price for the consumer type competitive\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"803","name":"Hourly average price Generic Units Nom. Failure competitive suppliers component","name_es":"Precio medio horario componente fallo nominaci\u00f3n UPG contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the Generic Programming Units\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"804","name":"Quarter-hourly average price final competitive suppliers","name_es":"Precio medio cuarto horario final contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the weighted average quarter-hourly price of energy for the consumer type competitive suppliers. For dates prior to January 1,\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"805","name":"Quarter-hourly average price day ahead market component","name_es":"Precio medio cuarto horario componente mercado diario","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of day ahead market within the weighted average quarter-hourly energy price for all types of consumers. For dates\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"806","name":"Quarter-hourly average price PBF technical constraints component","name_es":"Precio medio cuarto horario componente restricciones PBF","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of PBF technical constraints within the weighted average quarter-hourly energy price for all types of consumers. For\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"807","name":"Quarter-hourly average price real time technical constraints component","name_es":"Precio medio cuarto horario componente restricciones tiempo real","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the real time technical constraints component within the weighted average quarter-hourly energy price for all types of consumers.\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"808","name":"Quarter-hourly average price intraday market component","name_es":"Precio medio cuarto horario componente mercado intradiario","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of intraday market within the weighted average quarter-hourly energy price for all types of consumers. For dates\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"809","name":"Hourly average price intraday market tech. constraints component","name_es":"Precio medio horario componente restricciones intradiario ","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"810","name":"Hourly average price Upward reserve power component","name_es":"Precio medio horario componente reserva de potencia adicional a subir ","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the upwards power reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"811","name":"Quarter-hourly average price secondary reserve component","name_es":"Precio medio cuarto horario componente banda secundaria","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of secondary reserve within the weighted average quarter-hourly energy price for all types of consumers. For dates\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"812","name":"Quarter-hourly average price imbalances component","name_es":"Precio medio cuarto horario componente desv\u00edos","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of imbalances within the weighted average quarter-hourly energy price for all types of consumers. For dates prior to\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"813","name":"Quarter-hourly average price imbalances net value component","name_es":"Precio medio cuarto horario componente saldo desv\u00edos","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of imbalances net value within the weighted average quarter-hourly energy price for all types of consumers. For\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"814","name":"Quarter-hourly average price capacity payments component","name_es":"Precio medio cuarto horario componente pagos capacidad","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of capacity payments within the weighted average quarter-hourly energy price for all types of consumers. For dates\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"815","name":"Quarter-hourly average price P.O.14.6 balance component","name_es":"Precio medio cuarto horario componente saldo P.O.14.6.","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of P.O.14.6 balance within the weighted average quarter-hourly energy price for all types of consumers. For dates\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"816","name":"Hourly average price Generic Units Nom. Failure component","name_es":"Precio medio horario componente fallo nominaci\u00f3n UPG ","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the Generic Programming Units\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"818","name":"Monthly final energy competitive suppliers quota","name_es":"Energ\u00eda mensual final contrataci\u00f3n libre cuota","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the percentage of energy on\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"819","name":"Monthly final energy last resort suppliers quota","name_es":"Energ\u00eda mensual final comercializadores de referencia cuota","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the percentage of energy on\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"821","name":"Final annual energy competitive suppliers quota","name_es":"Energ\u00eda anual final comercializaci\u00f3n libre cuota","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the percentage of energy on\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"822","name":"Final annual energy last resort suppliers quota","name_es":"Energ\u00eda anual final comercializadores de referencia cuota","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the percentage of energy on\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"830","name":"Hourly final energy last resort suppliers","name_es":"Energ\u00eda horaria final comercializadores \u00faltimo recurso","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"843","name":"Hourly final energy competitive suppliers","name_es":"Energ\u00eda horaria final comercializaci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"857","name":"Monthly average price Day Ahead market competitive suppliers component","name_es":"Precio medio mensual componente mercado diario contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the Day Ahead market component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"858","name":"Monthly average price PBF technical constraints competitive suppliers component","name_es":"Precio medio mensual componente restricciones PBF contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the PBF constraints component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"859","name":"Monthly average price real time technical constraints competitive suppliers component","name_es":"Precio medio mensual componente restricciones tiempo real contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the real time constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"860","name":"Monthly average price intraday market competitive suppliers component","name_es":"Precio medio mensual componente mercado intradiario contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday market component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"862","name":"Monthly average price Upward reserve power competitive suppliers component","name_es":"Precio medio mensual componente reserva de potencia adicional a subir contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the upwards power reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"863","name":"Monthly average price secondary reserve competitive suppliers component","name_es":"Precio medio mensual componente banda secundaria contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the secondary band reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"864","name":"Monthly average price measured imbalances competitive suppliers component","name_es":"Precio medio mensual componente desv\u00edos medidos contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the measured imbalances market\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"865","name":"Monthly average price imbalances net value competitive suppliers component","name_es":"Precio medio mensual componente saldo de desv\u00edos contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the monthly average price\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"866","name":"Monthly average price capacity payment competitive suppliers component","name_es":"Precio medio mensual componente pago de capacidad contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the capacity payments reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"867","name":"Monthly average price P.O.14.6 balance competitive suppliers component","name_es":"Precio medio mensual componente saldo P.O.14.6 contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the O.P.14.6 balance component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"869","name":"Monthly average price final competitive suppliers","name_es":"Precio medio mensual final contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy monthly weighted\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"870","name":"Monthly average price Day Ahead market last resort suppliers component","name_es":"Precio medio mensual componente mercado diario comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the daily market component of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"871","name":"Monthly average price PBF technical constraints last resort suppliers component","name_es":"Precio medio mensual componente restricciones PBF comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the PBF constraints component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"872","name":"Monthly average price real time technical constraints last resort suppliers component","name_es":"Precio medio mensual componente restricciones tiempo real comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the real time constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"873","name":"Monthly average price intraday market last resort suppliers component","name_es":"Precio medio mensual componente mercado intradiario comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the daily market component of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"875","name":"Monthly average price Upward reserve power last resort suppliers component","name_es":"Precio medio mensual componente reserva de potencia adicional a subir comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the upwards power reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"876","name":"Monthly average price secondary reserve last resort suppliers component","name_es":"Precio medio mensual componente banda secundaria comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the secondary band component of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"877","name":"Monthly average price measured imbalances last resort suppliers component","name_es":"Precio medio mensual componente desv\u00edos medidos comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the measured imbalances\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"878","name":"Monthly average price imbalances net value last resort suppliers component","name_es":"Precio medio mensual componente saldo de desv\u00edos comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the monthly average price\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"879","name":"Monthly average price capacity payment last resort suppliers component","name_es":"Precio medio mensual componente pago de capacidad comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the capacity payment component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"880","name":"Monthly average price P.O.14.6 balance last resort suppliers component","name_es":"Precio medio mensual componente saldo P.O.14.6 comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the O.P.14.6 balance component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"882","name":"Monthly average price final last resort suppliers","name_es":"Precio medio mensual final comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy monthly weighted\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"883","name":"Monthly average price Day Ahead market component","name_es":"Precio medio mensual componente mercado diario","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the daily market component of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"884","name":"Monthly average price PBF technical constraints component","name_es":"Precio medio mensual componente restricciones PBF","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the PBF constraints component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"885","name":"Monthly average price real time technical constraints component","name_es":"Precio medio mensual componente restricciones tiempo real","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the real time constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"886","name":"Monthly average price intraday market component","name_es":"Precio medio mensual componente mercado intradiario","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday market component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"888","name":"Monthly average price Upward reserve power component","name_es":"Precio medio mensual componente reserva de potencia adicional a subir","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the upwards power reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"889","name":"Monthly average price secondary reserve component","name_es":"Precio medio mensual componente banda secundaria","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the secondary band component of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"890","name":"Monthly average price measured imbalances component","name_es":"Precio medio mensual componente desv\u00edos medidos","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the measured imbalances\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"891","name":"Monthly average price imbalances net value component","name_es":"Precio medio mensual componente saldo de desv\u00edos","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the imbalances net value\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"892","name":"Monthly average price capacity payment component","name_es":"Precio medio mensual componente pago de capacidad","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the capacity payment component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"893","name":"Monthly average price P.O.14.6 balance component","name_es":"Precio medio mensual componente saldo P.O.14.6","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the O.P.14.6 balance component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"908","name":"Monthly final energy competitive suppliers","name_es":"Energ\u00eda mensual final contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"921","name":"Monthly final energy last resort suppliers","name_es":"Energ\u00eda mensual final comercializador de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"935","name":"Annual average price Day Ahead market competitive suppliers component","name_es":"Precio medio anual componente mercado diario contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the Day Ahead market component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"936","name":"Annual average price PBF technical constraints competitive suppliers component","name_es":"Precio medio anual componente restricciones PBF contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the PBF constraints component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"937","name":"Annual average price real time technical constraints competitive suppliers component","name_es":"Precio medio anual componente restricciones tiempo real contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the real time constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"938","name":"Annual average price intraday market competitive suppliers component","name_es":"Precio medio anual componente mercado intradiario contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday market component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"939","name":"Annual average price intraday market tech. constraints competitive suppliers component","name_es":"Precio medio anual componente restricciones intradiario contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"940","name":"Annual average price Upward reserve power competitive suppliers component","name_es":"Precio medio anual componente reserva de potencia adicional a subir contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the upwards power reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"941","name":"Annual average price secondary reserve competitive suppliers component","name_es":"Precio medio anual componente banda secundaria contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the secondary band reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"942","name":"Annual average price measured imbalances competitive suppliers component","name_es":"Precio medio anual componente desv\u00edos medidos contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the measured imbalances market\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"943","name":"Annual average price imbalances net value competitive suppliers component","name_es":"Precio medio anual componente saldo de desv\u00edos contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the annual average price\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"944","name":"Annual average price capacity payment competitive suppliers component","name_es":"Precio medio anual componente pago de capacidad contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the capacity payment component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"945","name":"Annual average price P.O.14.6 balance competitive suppliers component","name_es":"Precio medio anual componente saldo P.O.14.6 contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the O.P.14.6 balance component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"946","name":"Annual average price Generic Units Nom. Failure competitive suppliers component","name_es":"Precio medio anual componente fallo nominaci\u00f3n UPG contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the Generic Programming Units\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"947","name":"Annual average price final competitive suppliers","name_es":"Precio medio anual final contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy annual weighted\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"948","name":"Annual average price Day Ahead market last resort suppliers component","name_es":"Precio medio anual componente mercado diario comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the daily market component of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"949","name":"Annual average price PBF technical constraints last resort suppliers component","name_es":"Precio medio anual componente restricciones PBF comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the PBF technical constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"950","name":"Annual average price real time technical constraints last resort suppliers component","name_es":"Precio medio anual componente restricciones tiempo real comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the real time constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"951","name":"Annual average price intraday market last resort suppliers component","name_es":"Precio medio anual componente mercado intradiario comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday market component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"952","name":"Annual average price intraday market tech. constraints last resort suppliers component","name_es":"Precio medio anual componente restricciones intradiario comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday technical\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"953","name":"Annual average price upwards reserve power last resort suppliers component","name_es":"Precio medio anual componente reserva de potencia adicional a subir comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the upwards power reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"954","name":"Annual average price secondary reserve last resort suppliers component","name_es":"Precio medio anual componente banda secundaria comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the secondary band component of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"955","name":"Annual average price measured imbalances last resort suppliers component","name_es":"Precio medio anual componente desv\u00edos medidos comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the measured imbalances\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"956","name":"Annual average price imbalances net value last resort suppliers component","name_es":"Precio medio anual componente saldo de desv\u00edos comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the imbalances balance of the\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"957","name":"Annual average price capacity payment last resort suppliers component","name_es":"Precio medio anual componente pago de capacidad comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the capacity payment component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"958","name":"Annual average price P.O.14.6 balance last resort suppliers component","name_es":"Precio medio anual componente saldo P.O.14.6 comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the O.P.14.6 balance component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"959","name":"Annual average price Generic Units Nom. Failure last resort suppliers component","name_es":"Precio medio anual componente fallo nominaci\u00f3n UPG comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the Generic Programming Units\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"960","name":"Annual average price final last resort suppliers","name_es":"Precio medio anual final comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy annual weighted\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"961","name":"Annual average price Day Ahead market component","name_es":"Precio medio anual componente mercado diario","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the daily market component of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"962","name":"Annual average price PBF technical constraints component","name_es":"Precio medio anual componente restricciones PBF","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the PBF constraints component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"963","name":"Annual average price real time technical constraints component","name_es":"Precio medio anual componente restricciones tiempo real","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the real time constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"964","name":"Annual average price intraday market component","name_es":"Precio medio anual componente mercado intradiario","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday market component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"965","name":"Annual average price intraday market tech. constraints component","name_es":"Precio medio anual componente restricciones intradiario","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the intraday constraints\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"966","name":"Annual average price Upward reserve power component","name_es":"Precio medio anual componente reserva de potencia adicional a subir","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the upwards power reserve\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"967","name":"Annual average price secondary reserve component","name_es":"Precio medio anual componente banda secundaria","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the secondary band component of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"968","name":"Annual average price measured imbalances component","name_es":"Precio medio anual componente desv\u00edos medidos","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the measured imbalances\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"969","name":"Annual average price imbalances net value component","name_es":"Precio medio anual componente saldo de desv\u00edos","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the imbalances net value\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"970","name":"Annual average price capacity payment component","name_es":"Precio medio anual componente pago de capacidad","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the capacity payment component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"971","name":"Annual average price P.O.14.6 balance component","name_es":"Precio medio anual componente saldo P.O.14.6","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the O.P.14.6 balance component\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"972","name":"Annual average price Generic Units Nom. Failure component","name_es":"Precio medio anual componente fallo nominaci\u00f3n UPG","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the Generic Programming Units\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"986","name":"Final annual energy competitive suppliers","name_es":"Energ\u00eda anual final comercializaci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"999","name":"Final annual energy last resort suppliers","name_es":"Energ\u00eda anual final comercializadores de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy on which is\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1275","name":"Hourly average price interruptibility service last resort suppliers component","name_es":"Precio medio horario componente servicio de interrumpibilidad comercializadores de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the interruptibility service\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1276","name":"Hourly average price interruptibility service contrataci\u00f3n libre component","name_es":"Precio medio horario componente servicio de interrumpibilidad contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the energy hourly weighted\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1277","name":"Hourly average price interruptibility service component","name_es":"Precio medio horario componente servicio de interrumpibilidad ","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the interruptibility service\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1278","name":"Monthly average price interruptibility service competitive suppliers component","name_es":"Precio medio mensual componente servicio de interrumpibilidad contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the interruptibility service\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1279","name":"Monthly average price interruptibility service last resort suppliers component","name_es":"Precio medio mensual componente servicio de interrumpibilidad comercializadores de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the interruptibility service\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1280","name":"Monthly average price interruptibility service component","name_es":"Precio medio mensual componente servicio de interrumpibilidad","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the interruptibility service\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1281","name":"Annual average price interruptibility service competitive suppliers component","name_es":"Precio medio anual componente servicio de interrumpibilidad contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the interruptibility service\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1282","name":"Annual average price interruptibility service last resort suppliers component","name_es":"Precio medio anual componente servicio de interrumpibilidad comercializadores de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the interruptibility service\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1283","name":"Annual average price interruptibility service component","name_es":"Precio medio anual componente servicio de interrumpibilidad","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the interruptibility service\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1284","name":"Quarter-hourly average price power factor control last resort suppliers component","name_es":"Precio medio cuarto horario componente control factor de potencia comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of power factor control within the weighted average quarter-hourly energy price for the consumer type last resort\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1285","name":"Quarter-hourly average price power factor control competitive suppliers component","name_es":"Precio medio cuarto horario componente control factor potencia contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of power factor control within the weighted average quarter-hourly energy price for the consumer type competitive\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1286","name":"Quarter-hourly average price power factor control component","name_es":"Precio medio cuarto horario componente control factor potencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of power factor control within the weighted average quarter-hourly energy price for all types of consumers. For\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1287","name":"Monthly average price power factor control competitive suppliers component","name_es":"Precio medio mensual componente control factor potencia contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the monthly average price power\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1288","name":"Monthly average price power factor control last resort suppliers component","name_es":"Precio medio mensual componente control factor potencia comercializador de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the monthly average price power\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1289","name":"Monthly average price power factor control component","name_es":"Precio medio mensual componente control factor potencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the power factor control\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1290","name":"Annual average price power factor control competitive suppliers component","name_es":"Precio medio anual componente control factor potencia contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the annual average price power\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1291","name":"Annual average price power factor control last resort suppliers component","name_es":"Precio medio anual componente control factor potencia comercializadores de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the annual average price power\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1292","name":"Annual average price power factor control component","name_es":"Precio medio anual componente control factor potencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the power factor control\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1360","name":"Monthly average price balance energy failure competitive suppliers component","name_es":"Precio medio mensual componente incumplimiento energ\u00eda de balance contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the monthly average price\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1361","name":"Monthly average price balance energy failure last resort suppliers component","name_es":"Precio medio mensual componente incumplimiento energ\u00eda de balance comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the monthly average price\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1362","name":"Monthly average price balance energy failure component","name_es":"Precio medio mensual componente incumplimiento energ\u00eda de balance ","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the balance energy failure\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1363","name":"Annual average price balance energy failure competitive suppliers component","name_es":"Precio medio anual componente incumplimiento energ\u00eda de balance contrataci\u00f3n libre","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the annual average price\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1364","name":"Annual average price balance energy failure last resort suppliers component","name_es":"Precio medio anual componente incumplimiento energ\u00eda de balance comercializaci\u00f3n de referencia","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the annual average price\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1365","name":"Annual average price balance energy failure component","name_es":"Precio medio anual componente incumplimiento energ\u00eda de balance ","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the balance energy failure\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1366","name":"Quarter-hourly average price balance energy failure competitive suppliers component","name_es":"Precio medio cuarto horario componente incumplimiento energ\u00eda de balance contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of balance energy failure within the weighted average quarter-hourly energy price for the consumer type competitive\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1367","name":"Quarter-hourly average price balance energy failure last resort suppliers component","name_es":"Precio medio cuarto horario componente incumplimiento energ\u00eda de balance comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of balance energy failure within the weighted average quarter-hourly energy price for the consumer type last resort\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1368","name":"Quarter-hourly average price balance energy failure component","name_es":"Precio medio cuarto horario componente incumplimiento energ\u00eda de balance","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of balance energy failure within the weighted average quarter-hourly energy price for all types of consumers. For\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1435","name":"Final Hourly Schedule PHFC Competitive suppliers","name_es":"Demanda programada PHFC Comercializadores mercado libre","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1436","name":"Final Hourly Schedule PHFC Suppliers of last resort","name_es":"Demanda programada PHFC Comercializadores de referencia","description":"Energy corresponding to the scheduling established by the SO after each continuous intraday market session as a result of the aggregation of all final transactions entered for each scheduling period as a result of the Viable Daily Schedule and the intraday market matching up. In particular, this\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1901","name":"Precio medio horario componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance","name_es":"Precio medio horario componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance ","description":"Adjust process","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1902","name":"Precio medio horario componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance contrataci\u00f3n libre","name_es":"Precio medio horario componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance contrataci\u00f3n libre","description":"Adjust process","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1903","name":"Precio medio horario componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance comercializadores de referencia","name_es":"Precio medio horario componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance comercializadores de referencia","description":"Adjust process","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1904","name":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario - diferencia por liquidaci\u00f3n con medidas","name_es":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario - diferencia por liquidaci\u00f3n con medidas","description":"Adjust process","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1905","name":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario - dif. por liq. con medidas contrataci\u00f3n libre","name_es":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario - dif. por liq. con medidas contrataci\u00f3n libre","description":"Adjust process","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1906","name":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario - dif. por liq. con med. comerc. referencia","name_es":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario - dif. por liq. con med. comerc. referencia","description":"Adjust process","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1907","name":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario","name_es":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario ","description":"Adjust process","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1908","name":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario contrataci\u00f3n libre","name_es":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario contrataci\u00f3n libre","description":"Adjust process","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1909","name":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario comercializadores de referencia","name_es":"Precio medio horario componente RD-L 10/2022 mercado diario e intradiario comercializadores de referencia","description":"Adjust process","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1910","name":"Monthly average price RD-L 10/2022 technical constraints and balancing services","name_es":"Precio medio mensual componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance","description":"Monthly average price RD-L 10/2022 technical constraints and balancing services","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1911","name":"Monthly average price RD-L 10/2022 technical constraints and balancing services last resort suppliers component","name_es":"Precio medio mensual componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance contrataci\u00f3n libre","description":"Monthly average price RD-L 10/2022 technical constraints and balancing services last resort suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1912","name":"Monthly average price RD-L 10/2022 technical constraints and balancing services competitive suppliers component","name_es":"Precio medio mensual componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance comercializaci\u00f3n de referencia","description":"Monthly average price RD-L 10/2022 technical constraints and balancing services competitive suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1913","name":"Monthly average price RD-L 10/2022 Day Ahead and intraday market - metering settlement difference","name_es":"Precio medio mensual componente RD-L 10/2022 mercado diario e intradiario - diferencia por liquidaci\u00f3n con medidas","description":"Monthly average price RD-L 10/2022 Day Ahead and intraday market - metering settlement difference","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1914","name":"Monthly average price RD-L 10/2022 Day Ahead and intraday market - metering settlement difference last resort suppliers component","name_es":"Precio medio mensual componente RD-L 10/2022 mercado diario e intradiario - diferencia por liquidaci\u00f3n con medidas contrataci\u00f3n libre","description":"Monthly average price RD-L 10/2022 Day Ahead and intraday market - metering settlement difference last resort suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1915","name":"Monthly average price RD-L 10/2022 Day Ahead and intraday market - metering settlement difference competitive suppliers component","name_es":"Precio medio mensual componente RD-L 10/2022 mercado diario e intradiario - diferencia por liquidaci\u00f3n con medidas comercializaci\u00f3n de referencia","description":"Monthly average price RD-L 10/2022 Day Ahead and intraday market - metering settlement difference competitive suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1916","name":"Monthly average price RD-L 10/2022 Day Ahead and intraday market","name_es":"Precio medio mensual componente RD-L 10/2022 mercado diario e intradiario","description":"Monthly average price RD-L 10/2022 Day Ahead and intraday market","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1917","name":"Monthly average price RD-L 10/2022 Day Ahead and intraday market last resort suppliers component","name_es":"Precio medio mensual componente RD-L 10/2022 mercado diario e intradiario contrataci\u00f3n libre","description":"Monthly average price RD-L 10/2022 Day Ahead and intraday market last resort suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1918","name":"Monthly average price RD-L 10/2022 Day Ahead and intraday market competitive suppliers component","name_es":"Precio medio mensual componente RD-L 10/2022 mercado diario e intradiario comercializaci\u00f3n de referencia","description":"Monthly average price RD-L 10/2022 Day Ahead and intraday market competitive suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1919","name":"Yearly average price RD-L 10/2022 technical constraints and balancing services","name_es":"Precio medio anual componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance","description":"Yearly average price RD-L 10/2022 technical constraints and balancing services","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1920","name":"Yearly average price RD-L 10/2022 technical constraints and balancing services last resort suppliers component","name_es":"Precio medio anual componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance contrataci\u00f3n libre","description":"Yearly average price RD-L 10/2022 technical constraints and balancing services last resort suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1921","name":"Yearly average price RD-L 10/2022 technical constraints and balancing services competitive suppliers component","name_es":"Precio medio anual componente RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance comercializaci\u00f3n de referencia","description":"Yearly average price RD-L 10/2022 technical constraints and balancing services competitive suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1922","name":"Yearly average price RD-L 10/2022 Day Ahead and intraday market - metering settlement difference","name_es":"Precio medio anual componente RD-L 10/2022 mercado diario e intradiario - diferencia por liquidaci\u00f3n con medidas","description":"Yearly average price RD-L 10/2022 Day Ahead and intraday market - metering settlement difference","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1923","name":"Yearly average price RD-L 10/2022 Day Ahead and intraday market - metering settlement difference competitive suppliers component","name_es":"Precio medio anual componente RD-L 10/2022 mercado diario e intradiario - diferencia por liquidaci\u00f3n con medidas contrataci\u00f3n libre","description":"Yearly average price RD-L 10/2022 Day Ahead and intraday market - metering settlement difference competitive suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1924","name":"Yearly average price RD-L 10/2022 Day Ahead and intraday market","name_es":"Precio medio anual componente RD-L 10/2022 mercado diario e intradiario - diferencia por liquidaci\u00f3n con medidas comercializaci\u00f3n de referencia","description":"Yearly average price RD-L 10/2022 Day Ahead and intraday market","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1925","name":"Yearly average price RD-L 10/2022 Day Ahead and intraday market","name_es":"Precio medio anual componente RD-L 10/2022 mercado diario e intradiario","description":"Yearly average price RD-L 10/2022 Day Ahead and intraday market","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1926","name":"Yearly average price RD-L 10/2022 Day Ahead and intraday market last resort suppliers component","name_es":"Precio medio anual componente RD-L 10/2022 mercado diario e intradiario contrataci\u00f3n libre","description":"Yearly average price RD-L 10/2022 Day Ahead and intraday market last resort suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1927","name":"Yearly average price RD-L 10/2022 Day Ahead and intraday market competitive suppliers component","name_es":"Precio medio anual componente RD-L 10/2022 mercado diario e intradiario comercializaci\u00f3n de referencia","description":"Yearly average price RD-L 10/2022 Day Ahead and intraday market competitive suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2375","name":"Quarter-hourly average price voltage control (demand) component","name_es":"Precio medio cuarto horario componente control de tensi\u00f3n (demanda)","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of voltage control (demand) within the weighted average quarter-hourly energy price for all types of consumers. For\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2376","name":"Quarter-hourly average price voltage control (demand) last resort suppliers component","name_es":"Precio medio cuarto horario componente control de tensi\u00f3n (demanda) comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of voltage control (demand) within the weighted average quarter-hourly energy price for the consumer type last\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2377","name":"Quarter-hourly average price voltage control (demand) competitive suppliers component","name_es":"Precio medio cuarto horario componente control de tensi\u00f3n (demanda) contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of voltage control (demand) within the weighted average quarter-hourly energy price for the consumer type\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2378","name":"Quarter-hourly average price active demand response (activated energy) component","name_es":"Precio medio cuarto horario componente servicio de respuesta activa energ\u00eda activada","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated energy) within the weighted average quarter-hourly energy price for all types\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2379","name":"Quarter-hourly average price active demand response (activated energy) last resort suppliers component","name_es":"Precio medio cuarto horario componente servicio de respuesta activa energ\u00eda activada comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated energy) within the weighted average quarter-hourly energy price for the\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2380","name":"Quarter-hourly average price active demand response (activated energy) competitive suppliers component","name_es":"Precio medio cuarto horario componente servicio de respuesta activa energ\u00eda activada contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated energy) within the weighted average quarter-hourly energy price for the\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2381","name":"Quarter-hourly average price active demand response (activated capacity) component","name_es":"Precio medio cuarto horario componente servicio de respuesta activa potencia asignada","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated capacity) within the weighted average quarter-hourly energy price for all types\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2382","name":"Quarter-hourly average price active demand response (activated capacity) last resort suppliers component","name_es":"Precio medio cuarto horario componente servicio de respuesta activa potencia asignada comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated capacity) within the weighted average quarter-hourly energy price for the\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2383","name":"Quarter-hourly average price active demand response (activated capacity) competitive suppliers component","name_es":"Precio medio cuarto horario componente servicio de respuesta activa potencia asignada contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated capacity) within the weighted average quarter-hourly energy price for the\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2384","name":"Quarter-hourly average price active demand response (activated capacity failure) component","name_es":"Precio medio cuarto horario componente servicio de respuesta activa incumplimiento potencia asignada","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated capacity failure) within the weighted average quarter-hourly energy price for\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2385","name":"Quarter-hourly average price active demand response (activated capacity failure) last resort suppliers component","name_es":"Precio medio cuarto horario componente servicio de RAD incumplimiento potencia asignada comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated capacity failure) within the weighted average quarter-hourly energy price for\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2386","name":"Quarter-hourly average price active demand response (activated capacity failure) competitive suppliers component","name_es":"Precio medio cuarto horario componente servicio de respuesta activa incumplimiento potencia asignada contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated capacity failure) within the weighted average quarter-hourly energy price for\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2387","name":"Quarter-hourly average price active demand response (activated energy failure) component","name_es":"Precio medio cuarto horario componente servicio de respuesta activa incumplimiento energ\u00eda activada","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated energy failure) within the weighted average quarter-hourly energy price for all\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2388","name":"Quarter-hourly average price active demand response (activated energy failure) last resort suppliers component","name_es":"Precio medio cuarto horario componente servicio de RAD incumplimiento energ\u00eda activada comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated energy failure) within the weighted average quarter-hourly energy price for the\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2389","name":"Quarter-hourly average price active demand response (activated energy failure) competitive suppliers component","name_es":"Precio medio cuarto horario componente servicio de respuesta activa incumplimiento energ\u00eda activada contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (activated energy failure) within the weighted average quarter-hourly energy price for the\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2390","name":"Quarter-hourly average price emergency support program component","name_es":"Precio medio cuarto horario componente intercambios apoyo con precio","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of emergency support program within the weighted average quarter-hourly energy price for all types of consumers. For\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2391","name":"Quarter-hourly average price emergency support program last resort suppliers component","name_es":"Precio medio cuarto horario componente intercambios apoyo con precio comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of emergency support program within the weighted average quarter-hourly energy price for the consumer type last\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2392","name":"Quarter-hourly average price emergency support program competitive suppliers component","name_es":"Precio medio cuarto horario componente intercambios apoyo con precio contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of emergency support program within the weighted average quarter-hourly energy price for the consumer type\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2393","name":"Quarter-hourly average price active demand response (BRP cost) component","name_es":"Precio medio cuarto horario componente coste a BRP servicio de respuesta activa","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (BRP cost) within the weighted average quarter-hourly energy price for all types of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2394","name":"Quarter-hourly average price active demand response (BRP cost) last resort suppliers component","name_es":"Precio medio cuarto horario componente coste a BRP servicio de respuesta activa comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (BRP cost) within the weighted average quarter-hourly energy price for the consumer type\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2395","name":"Quarter-hourly average price active demand response (BRP cost) competitive suppliers component","name_es":"Precio medio cuarto horario componente coste a BRP servicio de respuesta activa contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of active demand response (BRP cost) within the weighted average quarter-hourly energy price for the consumer type\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2396","name":"Quarter-hourly average price aFRR failure component","name_es":"Precio medio cuarto horario componente incumplimiento aFRR","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of aFRR failure within the weighted average quarter-hourly energy price for all types of consumers. For dates prior\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2397","name":"Quarter-hourly average price aFRR failure last resort suppliers component","name_es":"Precio medio cuarto horario componente incumplimiento aFRR comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of aFRR failure within the weighted average quarter-hourly energy price for the consumer type last resort suppliers.\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2398","name":"Quarter-hourly average price aFRR failure competitive suppliers component","name_es":"Precio medio cuarto horario componente incumplimiento aFRR contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of aFRR failure within the weighted average quarter-hourly energy price for the consumer type competitive suppliers.\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2399","name":"Quarter-hourly average price voltage control (cost) component","name_es":"Precio medio cuarto horario componente control de tensi\u00f3n (coste)","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of voltage control (cost) within the weighted average quarter-hourly energy price for all types of consumers. For\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2400","name":"Quarter-hourly average price voltage control (cost) last resort suppliers component","name_es":"Precio medio cuarto horario componente control de tensi\u00f3n (coste) comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of voltage control (cost) within the weighted average quarter-hourly energy price for the consumer type last resort\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2401","name":"Quarter-hourly average price voltage control (cost) competitive suppliers component","name_es":"Precio medio cuarto horario componente control de tensi\u00f3n (coste) contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of voltage control (cost) within the weighted average quarter-hourly energy price for the consumer type competitive\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2402","name":"Quarter-hourly average price economic regime for renewable energies component","name_es":"Precio medio cuarto horario componente r\u00e9gimen econ\u00f3mico de energ\u00edas renovables","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of economic regime for renewable energies within the weighted average quarter-hourly energy price for all types of\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2403","name":"Quarter-hourly average price economic regime for renewable energies last resort suppliers component","name_es":"Precio medio cuarto horario componente r\u00e9gimen econ\u00f3mico de energ\u00edas renovables comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of economic regime for renewable energies within the weighted average quarter-hourly energy price for the consumer\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2404","name":"Quarter-hourly average price economic regime for renewable energies competitive suppliers component","name_es":"Precio medio cuarto horario componente r\u00e9gimen econ\u00f3mico de energ\u00edas renovables contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of economic regime for renewable energies within the weighted average quarter-hourly energy price for the consumer\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2539","name":"Average monthly price for the active demand response service component","name_es":"Precio medio mensual componente servicio respuesta activa de la demanda","description":"Average monthly price for the active demand response service component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2540","name":"Average monthly price of the voltage control component of income","name_es":"Precio medio mensual componente ingreso control tensi\u00f3n","description":"Average monthly price of the voltage control component of income","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2541","name":"Average monthly price for the active demand response service component of contracting","name_es":"Precio medio mensual componente servicio respuesta activa de la demanda contrataci\u00f3n","description":"Average monthly price for the active demand response service component of contracting","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2542","name":"Average monthly price for income component, voltage control, free contracting","name_es":"Precio medio mensual componente ingreso control de tensi\u00f3n contrataci\u00f3n libre","description":"Average monthly price for income component, voltage control, free contracting","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10028","name":"Hourly final energy competitive suppliers quota","name_es":"Energ\u00eda horaria final contrataci\u00f3n libre cuota","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the percentage of energy on\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10029","name":"Hourly final energy last resort suppliers quota","name_es":"Energ\u00eda horaria final contrataci\u00f3n CUR cuota","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the percentage of energy on\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10211","name":"Hourly average price final sum of components","name_es":"Precio medio horario final suma de componentes","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. The breakdown of this indicator details the components of the hourly\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10212","name":"Hourly average price final last resort supplier sum of components","name_es":"Precio medio horario final comercializadores de referencia suma de componentes","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. The breakdown of this indicator details the components of the hourly\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10213","name":"Annual average price final competitive suppliers sum of components","name_es":"Precio medio anual final contrataci\u00f3n libre suma de componentes","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. The breakdown of this indicator details the components of the annual\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10214","name":"Hourly average price final competitive suppliers sum of components","name_es":"Precio medio horario final contrataci\u00f3n libre suma de componentes","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. The breakdown of this indicator details the components of the hourly\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10215","name":"Annual average price final last resort suppliers sum of components","name_es":"Precio medio anual final comercializaci\u00f3n de referencia suma de componentes","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. The breakdown of this indicator details the components of the annual\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10216","name":"Monthly average price final sum of components","name_es":"Precio medio mensual final suma de componentes","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. The breakdown of this indicator details the components of the annual\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10217","name":"Annual average price final sum of components","name_es":"Precio medio anual final suma de componentes","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. The breakdown of this indicator details the components of the annual\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10218","name":"Monthly average price final last resort suppliers sum of components","name_es":"Precio medio mensual final comercializaci\u00f3n de referencia suma de componentes","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. The breakdown of this indicator details the components of the monthly\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10219","name":"Monthly average price final competitive suppliers sum of components","name_es":"Precio medio mensual final contrataci\u00f3n libre suma de componentes","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. The breakdown of this indicator details the components of the monthly\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10229","name":"Default tariff of active energy invoicing price sum of components","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC peaje por defecto suma componentes","description":"Energy term hourly price applied in the consumers' electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls (Order IET/107/2014, 31 January), the charges and the production cost.\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10230","name":"Efficiency 2 periods (DHA) tariff of active energy invoicing Price sum of components","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC eficiencia 2 periodos (DHA) suma componentes","description":"Energy term hourly price applied in the consumers' electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls (Order IET/107/2014, 31 January), the charges and the production cost.\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10231","name":"Electric vehicle tariff of active energy invoicing Price sum of components","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC veh\u00edculo el\u00e9ctrico suma componentes","description":"Energy term hourly price applied in the consumers' electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls (Order IET/107/2014, 31 January), the charges and the production cost.\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10328","name":"Monthly average price services system adjustment component","name_es":"Precio medio mensual componente servicios ajuste del sistema","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the services system adjustment\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10329","name":"Annual average price services system adjustment component","name_es":"Precio medio anual componente servicios ajuste del sistema","description":"Complying with what is specified in the fifth additional disposal of the Order ITC/1659/2009, in this section is published the final energy cost, as well as the final price components, aggregated and for each type of consumer. In particular, this indicator refers to the services system adjustment\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10378","name":"Quarter-hourly average price technical constraints last resort suppliers","name_es":"Precio medio cuarto horario componente restricciones t\u00e9cnicas comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of technical constraints within the weighted average quarter-hourly energy price for the consumer type last resort\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10379","name":"Quarter-hourly average price technical constraints competitive suppliers","name_es":"Precio medio cuarto horario componente restricciones t\u00e9cnicas contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of technical constraints within the weighted average quarter-hourly energy price for the consumer type competitive\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10381","name":"Quarter-hourly average price OS processes last resort suppliers","name_es":"Precio medio cuarto horario componente procesos OS comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of OS processes within the weighted average quarter-hourly energy price for the consumer type last resort suppliers.\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10382","name":"Quarter-hourly average price OS processes competitive suppliers","name_es":"Precio medio cuarto horario componente procesos OS contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of OS processes within the weighted average quarter-hourly energy price for the consumer type competitive suppliers.\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10391","name":"2.0TD tariff of active energy invoicing Price sum of components","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC 2.0TD suma componentes","description":"Energy term hourly price applied in the consumers electrical bill with a contracted power not exceeding 10 kWand which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls, the charges and the production cost. It does not include taxes. In\u2026","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10403","name":"Hourly average price adjust process RD-L 10/2022 component","name_es":"Precio medio horario componente mecanismo de ajuste RD-L 10/2022","description":"Hourly average price adjust process RD-L 10/2022 component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10404","name":"Hourly average price adjust process RD-L 10/2022 competitive suppliers component","name_es":"Precio medio horario componente mecanismo de ajuste RD-L 10/2022 contrataci\u00f3n libre","description":"Hourly average price adjust process RD-L 10/2022 competitive suppliers component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10405","name":"Hourly average price adjust process RD-L 10/2022 last support supplier component","name_es":"Precio medio horario componente mecanismo de ajuste RD-L 10/2022 comercializadores de referencia","description":"Hourly average price adjust process RD-L 10/2022 last support supplier component","category":"Settlement","subcategory":"Price components","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10406","name":"RD-L 10/2022 Day Ahead and intraday market - Monthly","name_es":"RD-L 10/2022 mercado diario e intradiario - Mensual","description":"RD-L 10/2022 Day Ahead and intraday market - Monthly","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10407","name":"RD-L 10/2022 Day Ahead and intraday market - metering settlement difference - Monthly","name_es":"RD-L 10/2022 mercado diario e intradiario - diferencia por liquidaci\u00f3n con medidas - Mensual","description":"RD-L 10/2022 Day Ahead and intraday market - metering settlement difference - Monthly","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10408","name":"RD-L 10/2022 technical constraints and balancing services - Monthly","name_es":"RD-L 10/2022 restricciones t\u00c3\u00a9cnicas y mercados de balance - Mensual","description":"RD-L 10/2022 technical constraints and balancing services - Monthly","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10409","name":"RD-L 10/2022 Day Ahead and intraday market - Yearly","name_es":"RD-L 10/2022 mercado diario e intradiario - Anual","description":"RD-L 10/2022 Day Ahead and intraday market - Yearly","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10410","name":"RD-L 10/2022 Day Ahead and intraday market - metering settlement difference - Yearly","name_es":"RD-L 10/2022 mercado diario e intradiario - diferencia por liquidaci\u00f3n con medidas - Anual","description":"RD-L 10/2022 Day Ahead and intraday market - metering settlement difference - Yearly","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10411","name":"RD-L 10/2022 technical constraints and balancing services - Yearly","name_es":"RD-L 10/2022 restricciones t\u00e9cnicas y mercados de balance - Anual","description":"RD-L 10/2022 technical constraints and balancing services - Yearly","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10524","name":"Quarter-hourly average price amount participation services last resort suppliers","name_es":"Precio medio cuarto horario componente importe participaci\u00f3n servicios comercializadores de referencia","description":"In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of amount participation services within the weighted average quarter-hourly energy price for the consumer type last\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10525","name":"Quarter-hourly average price amount participation services competitive suppliers","name_es":"Precio medio cuarto horario componente importe participaci\u00f3n servicios contrataci\u00f3n libre","description":"In this section, the average final price of energy is published, calculated according to the criterios of the current Resolution. Specifically, this indicator refers to the component of amount participation services within the weighted average quarter-hourly energy price for the consumer type\u2026","category":"Settlement","subcategory":"Price components","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"770","name":"Capacity payment 2.0.DHA rate","name_es":"Pagos por capacidad tarifa 2.0.DHA","description":"The Capacity Payments consist on, a payment regulated to finance the power capacity service at medium and long-term offered by the generation facilities to the electrical systems. This concept regulated is included on the Energy Term. In particular, this indicator refers to the capacity payments\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"774","name":"Capacity payment 2.0.DHS rate","name_es":"Pagos por capacidad tarifa 2.0.DHS","description":"The Capacity Payments consist on, a payment regulated to finance the power capacity service at medium and long-term offered by the generation facilities to the electrical systems. This concept regulated is included on the Energy Term. In particular, this indicator refers to the capacity payments\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"776","name":"Capacity payment 2.1.DHA rate","name_es":"Pagos por capacidad tarifa 2.1.DHA","description":"The Capacity Payments consist on, a payment regulated to finance the power capacity service at medium and long-term offered by the generation facilities to the electrical systems. This concept regulated is included on the Energy Term. In particular, this indicator refers to the capacity payments\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"777","name":"Capacity payment 2.1.DHS rate","name_es":"Pagos por capacidad tarifa 2.1.DHS","description":"The Capacity Payments consist on, a payment regulated to finance the power capacity service at medium and long-term offered by the generation facilities to the electrical systems. This concept regulated is included on the Energy Term. In particular, this indicator refers to the capacity payments\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1001","name":"2.0TD tariff of active energy invoicing price","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC 2.0TD","description":"Energy term hourly price applied in the consumers electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls, the charges and the production cost. It does not include taxes.\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1002","name":"2.0TD tariff period","name_es":"Periodo Tarifario del PVPC 2.0TD","description":"Tariff period of the term hourly price applied in the consumers electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). Publication: daily at 20:20 with the information of day D+1.","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1003","name":"P1 peak 2.0TD tariff of active energy invoicing price","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC 2.0TD P1 punta ","description":"Energy term hourly price of the 1 tariff period applied in the consumers electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls, the charges and the production cost. It does not\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1004","name":"P2 flat 2.0TD tariff of active energy invoicing price","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC 2.0TD P2 llano ","description":"Energy term hourly price of the 2 tariff period applied in the consumers electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls, the charges and the production cost. It does not\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1005","name":"P3 valley 2.0TD tariff of active energy invoicing price","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC 2.0TD P3 valle ","description":"Energy term hourly price of the 3 tariff period applied in the consumers electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls, the charges and the production cost. It does not\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1006","name":"Consumption profiles for PVPC billing purposes Tariff 2.0 GENERAL LOW VOLTAGE, POWER LESS THAN 15 kW","name_es":"Perfiles de consumo a efectos de facturaci\u00f3n del PVPC Tarifa 2.0 GENERAL BAJA TENSI\u00d3N, POTENCIA INFERIOR A 15 kW","description":"Load profile used to calculate the billing in consumers subscribed to the PVPC when the supply does not have the measurement equipment with capacity for telemetry and telemanagement, and effectively integrated in the corresponding systems, applying to the real readings by periods put at the\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1013","name":"Default tariff of active energy invoicing price","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC peaje por defecto","description":"Energy term hourly price applied in the consumers' electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls (Order IET/107/2014, 31 January), the charges and the production cost.\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1014","name":"Efficiency 2 periods (DHA) tariff of active energy invoicing Price","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC eficiencia 2 periodos (DHA)","description":"Energy term hourly price applied in the consumers' electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls (Order IET/107/2014, 31 January), the charges and the production cost.\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1015","name":"Electric vehicle tariff of active energy invoicing Price","name_es":"T\u00e9rmino de facturaci\u00f3n de energ\u00eda activa del PVPC veh\u00edculo el\u00e9ctrico","description":"Energy term hourly price applied in the consumers' electrical bill with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). It includes the energy term of the access tolls (Order IET/107/2014, 31 January), the charges and the production cost.\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1016","name":"Default tariff breakdown 2.0.A Day Ahead and Intraday Market","name_es":"Desglose peaje por defecto 2.0.A Mercado diario e intradiario","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1017","name":"Default tariff breakdown 2.0.A Ancillary services","name_es":"Desglose peaje por defecto 2.0.A Servicios de ajuste","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1018","name":"Default tariff breakdown 2.0.A Access tolls","name_es":"Desglose peaje por defecto 2.0.A Peaje de acceso","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1019","name":"Default tariff breakdown 2.0.A Capacity payment","name_es":"Desglose peaje por defecto 2.0.A Pago por capacidad","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1020","name":"Default tariff breakdown 2.0.A Interruptibility service","name_es":"Desglose peaje por defecto 2.0.A Servicio de interrumpibilidad","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1021","name":"Default tariff breakdown 2.0.A OS financing","name_es":"Desglose peaje por defecto 2.0.A Financiaci\u00f3n OS","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1022","name":"Default tariff breakdown 2.0.A OM financing","name_es":"Desglose peaje por defecto 2.0.A Financiaci\u00f3n OM","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1023","name":"Efficiency 2 periods (DHA) breakdown 2.0.DHA Day Ahead and Intraday Market","name_es":"Desglose eficiencia 2 periodos (DHA) 2.0.DHA Mercado diario e intradiario","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1024","name":"Efficiency 2 periods (DHA) breakdown 2.0.DHA ancillary services","name_es":"Desglose eficiencia 2 periodos (DHA) 2.0.DHA Servicios de ajuste","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1025","name":"Efficiency 2 periods (DHA) breakdown 2.0.DHA access toll","name_es":"Desglose eficiencia 2 periodos (DHA) 2.0.DHA Peaje de acceso","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1026","name":"Efficiency 2 periods (DHA) breakdown 2.0.DHA capacity payment","name_es":"Desglose eficiencia 2 periodos (DHA) 2.0.DHA Pago por capacidad","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1027","name":"Efficiency 2 periods (DHA) breakdown 2.0.DHA interruptibility service","name_es":"Desglose eficiencia 2 periodos (DHA) 2.0.DHA Servicio de interrumpibilidad","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1028","name":"Efficiency 2 periods (DHA) breakdown 2.0.DHA OS financing","name_es":"Desglose eficiencia 2 periodos (DHA) 2.0.DHA Financiaci\u00f3n OS","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1029","name":"Efficiency 2 periods (DHA) breakdown 2.0.DHA OM financing","name_es":"Desglose eficiencia 2 periodos (DHA) 2.0.DHA Financiaci\u00f3n OM","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1030","name":"Electric vehicle tariff breakdown 2.0.DHS Day Ahead and Intraday Market","name_es":"Desglose veh\u00edculo el\u00e9ctrico 2.0.DHS Mercado diario e intradiario","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1031","name":"Electric vehicle tariff breakdown 2.0.DHS Ancillary services","name_es":"Desglose veh\u00edculo el\u00e9ctrico 2.0.DHS Servicios de ajuste","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1032","name":"Electric vehicle tariff breakdown 2.0.DHS Access tolls","name_es":"Desglose veh\u00edculo el\u00e9ctrico 2.0.DHS Peaje de acceso","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1033","name":"Electric vehicle tariff breakdown 2.0.DHS Capacity payment","name_es":"Desglose veh\u00edculo el\u00e9ctrico 2.0.DHS Pago por capacidad","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1034","name":"Electric vehicle tariff breakdown 2.0.DHS Interruptibility service","name_es":"Desglose veh\u00edculo el\u00e9ctrico 2.0.DHS Servicio de interrumpibilidad","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1035","name":"Electric vehicle tariff breakdown 2.0.DHS OS financing","name_es":"Desglose veh\u00edculo el\u00e9ctrico 2.0.DHS Financiaci\u00f3n OS","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1036","name":"Electric vehicle tariff breakdown 2.0.DHS OM financing","name_es":"Desglose veh\u00edculo el\u00e9ctrico 2.0.DHS Financiaci\u00f3n OM","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1209","name":"Measured demand access tariff 2.0 GENERAL LOW VOLTAGE, POWER NOT EXCEEDING 15 KW","name_es":"Demanda medida tarifa de acceso 2.0 GENERAL BAJA TENSI\u00d3N, POTENCIA NO SUPERIOR A 15 KW ","description":"The access rate is the rate paid by the Trading company to the Distribution company for the use of the energy distribution network. Is a tariff fixed by the Government paid by the client through its Trading company when a rate is contracted in free market. 1. In particular, this indicator refers\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1249","name":"Number of Customers > 450 kW access tariff 2.0 GENERAL LOW VOLTAGE, POWER NOT EXCEEDING 15 KW","name_es":"N\u00ba de Clientes > 450 kW tarifa de acceso 2.0 GENERAL BAJA TENSI\u00d3N, POTENCIA NO SUPERIOR A 15 KW ","description":"Number of clients with contracted power over 450kW for the different rates. In particular, this indicator refers to the number of clients with access rate 2.0 GENERAL LOW VOLTAGE, POWER NOT GREATER THAN 15 KW . This indicator can be broken down by provinces. Publication: daily at around 3:30 with\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1388","name":"Default tariff breakdown 2.0.A Marketing cost","name_es":"Desglose peaje por defecto 2.0.A Coste de comercializaci\u00f3n","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1389","name":"Efficiency 2 periods (DHA) breakdown 2.0.DHA Marketing cost","name_es":"Desglose eficiencia 2 periodos (DHA) 2.0.DHA Coste de comercializaci\u00f3n","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1390","name":"Electric vehicle tariff breakdown 2.0.DHS Marketing cost","name_es":"Desglose veh\u00edculo el\u00e9ctrico 2.0.DHS Coste de comercializaci\u00f3n","description":"Concept integrated on the active energy billing term of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1739","name":"Self-consumption surplus energy price for the simplified compensation mechanism (PVPC)","name_es":"Precio de la energ\u00eda excedentaria del autoconsumo para el mecanismo de compensaci\u00f3n simplificada (PVPC)","description":"Hourly price of the surplus energy fed into the grid by the generation facilities of the consumers subscribed to PVPC (Small Consumer Voluntary Price) with a reference supplier, and who are subject to the simplified compensation mechanism as established in article 14 of the \u201cRoyal Decree 244/2019,\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1871","name":"Default tariff breakdown 2.0TD Ancillary services","name_es":"Desglose peaje por defecto 2.0TD Servicios de ajuste","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1872","name":"Default tariff breakdown 2.0TD Capacity payment","name_es":"Desglose peaje por defecto 2.0TD Pago por capacidad","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1873","name":"Default tariff breakdown 2.0TD Interruptibility service","name_es":"Desglose peaje por defecto 2.0TD Servicio de interrumpibilidad","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1874","name":"Default tariff breakdown 2.0TD OM financing","name_es":"Desglose peaje por defecto 2.0TD Financiaci\u00f3n OM","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1875","name":"Default tariff breakdown 2.0TD Day Ahead and Intraday Market","name_es":"Desglose peaje por defecto 2.0TD Mercado diario e intradiario","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1876","name":"Default tariff breakdown 2.0TD Tolls and charges","name_es":"Desglose peaje por defecto 2.0TD Peajes y cargos","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1877","name":"Default tariff breakdown 2.0TD OS financing","name_es":"Desglose peaje por defecto 2.0TD Financiaci\u00f3n OS","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1878","name":"Default tariff breakdown 2.0TD Marketing cost","name_es":"Desglose peaje por defecto 2.0TD Coste de comercializaci\u00f3n","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1879","name":"Default tariff breakdown 2.0TD Surplus or deficit renewable auctions","name_es":"Desglose peaje por defecto 2.0TD Excedente o d\u00e9ficit subastas renovables","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"cross-border","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"1900","name":"Default tariff breakdown 2.0TD surplus or deficit of settlement process to adjust generation costs","name_es":"Desglose peaje por defecto 2.0TD excedente o d\u00e9ficit de la liquidaci\u00f3n del mecanismo de ajuste de costes de producci\u00f3n","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). In particular, this indicator\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2531","name":"Measured demand access tariff 3.0.TDVE GENERAL LOW VOLTAGE, POWER ABOVE 15 kW FOR ELECTRIC VEHICLE","name_es":"Demanda medida tarifa de acceso 3.0.TDVE GENERAL BAJA TENSI\u00d3N, POTENCIA SUPERIOR 15 kW PARA VEH\u00cdCULO EL\u00c9CTRICO","description":"","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2532","name":"Measured demand access tariff 3.0.TD GENERAL LOW VOLTAGE, POWER ABOVE 15 kW","name_es":"Demanda medida tarifa de acceso 3.0.TD GENERAL BAJA TENSI\u00d3N, POTENCIA SUPERIOR A 15 kW","description":"","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2533","name":"Measured demand access tariff 6.1.TDVE - Tariff 6.1A for electric vehicle","name_es":"Demanda medida tarifa de acceso 6.1.TDVE - Tarifa 6.1A para veh\u00edculo el\u00e9ctrico","description":"","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2534","name":"Measured demand access tariff 6.2.TDVE - Tariff 6.2A for electric vehicle","name_es":"Demanda medida tarifa de acceso 6.2.TDVE - Tarifa 6.2A para veh\u00edculo el\u00e9ctrico","description":"","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2535","name":"Number of customers > 450 kW access tariff 3.0.TDVE GENERAL LOW VOLTAGE, POWER ABOVE 15 kW FOR ELECTRIC VEHICLE","name_es":"N\u00ba de Clientes > 450 kW tarifa de acceso 3.0.TDVE GENERAL BAJA TENSI\u00d3N, POTENCIA SUPERIOR 15 kW PARA VEH\u00cdCULO EL\u00c9CTRICO","description":"","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2536","name":"Number of customers > 450 kW access tariff 3.0.TD GENERAL LOW VOLTAGE, POWER ABOVE 15 kW","name_es":"N\u00ba de Clientes > 450 kW tarifa de acceso 3.0.TD GENERAL BAJA TENSI\u00d3N, POTENCIA SUPERIOR A 15 kW","description":"","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2537","name":"Number of customers > 450 kW access tariff 6.1.TDVE - Tariff 6.1A for electric vehicle","name_es":"N\u00ba de Clientes > 450 kW tarifa de acceso 6.1.TDVE - Tarifa 6.1A para veh\u00edculo el\u00e9ctrico","description":"","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"2538","name":"Number of customers > 450 kW access tariff 6.2.TDVE - Tariff 6.2A for electric vehicle","name_es":"N\u00ba de Clientes > 450 kW tarifa de acceso 6.2.TDVE - Tarifa 6.2A para veh\u00edculo el\u00e9ctrico","description":"","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10254","name":"Default tariff breakdown 2.0.A Energy Term","name_es":"Desglose peaje por defecto 2.0.A T\u00e9rmino de energ\u00eda","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). The breakdown of this\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10255","name":"Efficiency 2 periods (DHA) breakdown 2.0.DHA Energy Term","name_es":"Desglose eficiencia 2 periodos (DHA) 2.0.DHA T\u00e9rmino de energ\u00eda","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). The breakdown of this\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"Peninsula","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10256","name":"Electric vehicle tariff breakdown 2.0.DHS Energy Term","name_es":"Desglose veh\u00edculo el\u00e9ctrico 2.0.DHS T\u00e9rmino de energ\u00eda","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 10 kW and which are under the PVPC (Voluntary Price for Small Consumer). The breakdown of this\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null},{"source":"esios","id":"10393","name":"2.0TD tariff breakdown energy term","name_es":"Desglose peaje 2.0TD T\u00e9rmino de energ\u00eda","description":"Concept integrated on the billing term active energy of the PVPC that is the hourly price of the energy term applied in the electrical bill of the consumers with a contracted power not exceeding 15 kW and which are under the PVPC (Voluntary Price for Small Consumer). The breakdown of this\u2026","category":"Settlement","subcategory":"Retail tariffs","area":"national","used":false,"group":null,"column":null,"availability":null}]