Commit History

  1. Wave 14: close every Wave 13 review finding + 4 documentation files; Wave 14b: real PRIME-RL parity + multi-process DiLoCo convergence⁠

    d9dd3a5
  2. Wave 13: serverless DiLoCo + replaysim normalization + 3 distillation losses + PRIME-RL + Monarch⁠

    b266c31
  3. Wave 12: close V1-V8 brief — GPU smoke, SDPO firing, real-trace e2e⁠

    d88715c
  4. Wave 11: cross-model adversarial review + honest down-revision⁠

    f16fa23
  5. Wave 7: Phase 2-4 of deep work loop — backlog, parallel research, three ADRs⁠

    ac4bfb4
  6. Wave 6: vision validation self-audit (5/10 to 9/10 in 5 days, no GPU)⁠

    baladithyab
    040eff8

  1. Wave 3: integration architecture + spike-005 trainer skeleton (16 tests pass)⁠

    baladithyab
    fd77f74
  2. Integrate Cursor blog directly + audit research note + add SDPO/OPSD link⁠

    baladithyab
    1cede23
  3. Initial commit: Composer 2.5 Replication Framework — research synthesis⁠

    7165832