Commit History

  1. final Route B gate reports + campaign summary for the shipped model

    Verified signature
    a567b62

  1. Push 18-19 Aug drift: v10-v13_b adapters, corpora, all 22 gate reports, corrected qat_train.py, STATE_2026-08-21

    Verified signature
    6c8db72

  1. Refresh: v9 adapters + latest gate results + updated training context

    Verified signature
    83730b2
  2. Add pinned source manifest, citations, training context

    Verified signature
    440a0b7
  3. Full state: code, corpora, 8 adapters, gate results, dataset refs, session log

    Verified signature
    e7d8c8b
  4. initial commit

    Verified signature
    ef8aba9