Question: Three vessels, the Sable, the Ivory, and the Ember, navigated through a cyclone. The Sable logged calm conditions for 33 minutes. The Ivory enjoyed calm for longer than the Sable but less time than the Ember. The Ember reported the peak wind velocity after the eye moved past, while the Sable reported the mini... | Sable calm duration = 33 minutes.
Ivory calm duration = 55 minutes.
Ivory calm duration > Sable calm duration (55 > 33).
Ivory calm duration < Ember calm duration (55 < 65).
Ember calm duration > 55 minutes.
Order by calm duration: Sable, Ivory, Ember.
Ember recorded the highest wind speed immediately after the eye pa... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Cinder, Ivory, and Zephyr were in the eye. The Cinder had 35 minutes of calm. The Ivory’s calm period was longer than the Cinder’s but shorter than the Zephyr’s. The Zephyr recorded the strongest winds after the eye, and the Cinder the weakest. If the Ivory stayed calm for 43 minutes, ... | Cinder calm duration = 35 minutes.
Ivory calm duration = 43 minutes.
Ivory calm duration > Cinder calm duration (43 > 35).
Ivory calm duration < Zephyr calm duration (43 < 59).
Zephyr calm duration > 43 minutes.
Order by calm duration: Cinder, Ivory, Zephyr.
Zephyr recorded the highest wind speed immediately after the... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Ivory, Ember, and Tempest were in the eye. The Ivory had 31 minutes of calm. The Ember’s calm period was longer than the Ivory’s but shorter than the Tempest’s. The Tempest recorded the strongest winds after the eye, and the Ivory the weakest. If the Ember stayed calm for 43 minutes, o... | Ivory calm duration = 31 minutes.
Ember calm duration = 43 minutes.
Ember calm duration > Ivory calm duration (43 > 31).
Ember calm duration < Tempest calm duration (43 < 73).
Tempest calm duration > 43 minutes.
Order by calm duration: Ivory, Ember, Tempest.
Tempest recorded the highest wind speed immediately after th... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Odyssey, Sable, and Zephyr were in the eye. The Odyssey had 13 minutes of calm. The Sable’s calm period was longer than the Odyssey’s but shorter than the Zephyr’s. The Zephyr recorded the strongest winds after the eye, and the Odyssey the weakest. If the Sable stayed calm for 42 minut... | Odyssey calm duration = 13 minutes.
Sable calm duration = 42 minutes.
Sable calm duration > Odyssey calm duration (42 > 13).
Sable calm duration < Zephyr calm duration (42 < 54).
Zephyr calm duration > 42 minutes.
Order by calm duration: Odyssey, Sable, Zephyr.
Zephyr recorded the highest wind speed immediately after ... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Tempest, the Odyssey, and the Cinder, navigated through a cyclone. The Tempest logged calm conditions for 34 minutes. The Odyssey enjoyed calm for longer than the Tempest but less time than the Cinder. The Cinder reported the peak wind velocity after the eye moved past, while the Tempest re... | Tempest calm duration = 34 minutes.
Odyssey calm duration = 51 minutes.
Odyssey calm duration > Tempest calm duration (51 > 34).
Odyssey calm duration < Cinder calm duration (51 < 74).
Cinder calm duration > 51 minutes.
Order by calm duration: Tempest, Odyssey, Cinder.
Cinder recorded the highest wind speed immediatel... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Frost, Ember, and Vanguard were in the eye. The Frost had 28 minutes of calm. The Ember’s calm period was longer than the Frost’s but shorter than the Vanguard’s. The Vanguard recorded the strongest winds after the eye, and the Frost the weakest. If the Ember stayed calm for 40 minutes... | Frost calm duration = 28 minutes.
Ember calm duration = 40 minutes.
Ember calm duration > Frost calm duration (40 > 28).
Ember calm duration < Vanguard calm duration (40 < 53).
Vanguard calm duration > 40 minutes.
Order by calm duration: Frost, Ember, Vanguard.
Vanguard recorded the highest wind speed immediately afte... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Vanguard, the Ivory, and the Sable, navigated through a cyclone. The Vanguard logged calm conditions for 12 minutes. The Ivory enjoyed calm for longer than the Vanguard but less time than the Sable. The Sable reported the peak wind velocity after the eye moved past, while the Vanguard repor... | Vanguard calm duration = 12 minutes.
Ivory calm duration = 29 minutes.
Ivory calm duration > Vanguard calm duration (29 > 12).
Ivory calm duration < Sable calm duration (29 < 51).
Sable calm duration > 29 minutes.
Order by calm duration: Vanguard, Ivory, Sable.
Sable recorded the highest wind speed immediately after t... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Cinder, the Ember, and the Frost, navigated through a cyclone. The Cinder logged calm conditions for 14 minutes. The Ember enjoyed calm for longer than the Cinder but less time than the Frost. The Frost reported the peak wind velocity after the eye moved past, while the Cinder reported the ... | Cinder calm duration = 14 minutes.
Ember calm duration = 32 minutes.
Ember calm duration > Cinder calm duration (32 > 14).
Ember calm duration < Frost calm duration (32 < 46).
Frost calm duration > 32 minutes.
Order by calm duration: Cinder, Ember, Frost.
Frost recorded the highest wind speed immediately after the eye... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Odyssey, the Cinder, and the Ivory, navigated through a cyclone. The Odyssey logged calm conditions for 20 minutes. The Cinder enjoyed calm for longer than the Odyssey but less time than the Ivory. The Ivory reported the peak wind velocity after the eye moved past, while the Odyssey reporte... | Odyssey calm duration = 20 minutes.
Cinder calm duration = 50 minutes.
Cinder calm duration > Odyssey calm duration (50 > 20).
Cinder calm duration < Ivory calm duration (50 < 71).
Ivory calm duration > 50 minutes.
Order by calm duration: Odyssey, Cinder, Ivory.
Ivory recorded the highest wind speed immediately after ... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Zephyr, the Odyssey, and the Frost, navigated through a cyclone. The Zephyr logged calm conditions for 16 minutes. The Odyssey enjoyed calm for longer than the Zephyr but less time than the Frost. The Frost reported the peak wind velocity after the eye moved past, while the Zephyr reported ... | Zephyr calm duration = 16 minutes.
Odyssey calm duration = 32 minutes.
Odyssey calm duration > Zephyr calm duration (32 > 16).
Odyssey calm duration < Frost calm duration (32 < 44).
Frost calm duration > 32 minutes.
Order by calm duration: Zephyr, Odyssey, Frost.
Frost recorded the highest wind speed immediately after... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Odyssey, the Cinder, and the Nimbus, navigated through a cyclone. The Odyssey logged calm conditions for 22 minutes. The Cinder enjoyed calm for longer than the Odyssey but less time than the Nimbus. The Nimbus reported the peak wind velocity after the eye moved past, while the Odyssey repo... | Odyssey calm duration = 22 minutes.
Cinder calm duration = 49 minutes.
Cinder calm duration > Odyssey calm duration (49 > 22).
Cinder calm duration < Nimbus calm duration (49 < 62).
Nimbus calm duration > 49 minutes.
Order by calm duration: Odyssey, Cinder, Nimbus.
Nimbus recorded the highest wind speed immediately af... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Odyssey, the Tempest, and the Frost, navigated through a cyclone. The Odyssey logged calm conditions for 27 minutes. The Tempest enjoyed calm for longer than the Odyssey but less time than the Frost. The Frost reported the peak wind velocity after the eye moved past, while the Odyssey repor... | Odyssey calm duration = 27 minutes.
Tempest calm duration = 47 minutes.
Tempest calm duration > Odyssey calm duration (47 > 27).
Tempest calm duration < Frost calm duration (47 < 59).
Frost calm duration > 47 minutes.
Order by calm duration: Odyssey, Tempest, Frost.
Frost recorded the highest wind speed immediately af... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Cinder, Ivory, and Nimbus were in the eye. The Cinder had 34 minutes of calm. The Ivory’s calm period was longer than the Cinder’s but shorter than the Nimbus’s. The Nimbus recorded the strongest winds after the eye, and the Cinder the weakest. If the Ivory stayed calm for 45 minutes, ... | Cinder calm duration = 34 minutes.
Ivory calm duration = 45 minutes.
Ivory calm duration > Cinder calm duration (45 > 34).
Ivory calm duration < Nimbus calm duration (45 < 64).
Nimbus calm duration > 45 minutes.
Order by calm duration: Cinder, Ivory, Nimbus.
Nimbus recorded the highest wind speed immediately after the... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Ember, Nimbus, and Vanguard were in the eye. The Ember had 33 minutes of calm. The Nimbus’s calm period was longer than the Ember’s but shorter than the Vanguard’s. The Vanguard recorded the strongest winds after the eye, and the Ember the weakest. If the Nimbus stayed calm for 55 minu... | Ember calm duration = 33 minutes.
Nimbus calm duration = 55 minutes.
Nimbus calm duration > Ember calm duration (55 > 33).
Nimbus calm duration < Vanguard calm duration (55 < 77).
Vanguard calm duration > 55 minutes.
Order by calm duration: Ember, Nimbus, Vanguard.
Vanguard recorded the highest wind speed immediately ... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Odyssey, Ivory, and Vanguard were in the eye. The Odyssey had 30 minutes of calm. The Ivory’s calm period was longer than the Odyssey’s but shorter than the Vanguard’s. The Vanguard recorded the strongest winds after the eye, and the Odyssey the weakest. If the Ivory stayed calm for 41... | Odyssey calm duration = 30 minutes.
Ivory calm duration = 41 minutes.
Ivory calm duration > Odyssey calm duration (41 > 30).
Ivory calm duration < Vanguard calm duration (41 < 60).
Vanguard calm duration > 41 minutes.
Order by calm duration: Odyssey, Ivory, Vanguard.
Vanguard recorded the highest wind speed immediatel... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Ember, the Frost, and the Odyssey, navigated through a cyclone. The Ember logged calm conditions for 11 minutes. The Frost enjoyed calm for longer than the Ember but less time than the Odyssey. The Odyssey reported the peak wind velocity after the eye moved past, while the Ember reported th... | Ember calm duration = 11 minutes.
Frost calm duration = 26 minutes.
Frost calm duration > Ember calm duration (26 > 11).
Frost calm duration < Odyssey calm duration (26 < 41).
Odyssey calm duration > 26 minutes.
Order by calm duration: Ember, Frost, Odyssey.
Odyssey recorded the highest wind speed immediately after th... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Ivory, the Frost, and the Ember, navigated through a cyclone. The Ivory logged calm conditions for 35 minutes. The Frost enjoyed calm for longer than the Ivory but less time than the Ember. The Ember reported the peak wind velocity after the eye moved past, while the Ivory reported the mini... | Ivory calm duration = 35 minutes.
Frost calm duration = 45 minutes.
Frost calm duration > Ivory calm duration (45 > 35).
Frost calm duration < Ember calm duration (45 < 60).
Ember calm duration > 45 minutes.
Order by calm duration: Ivory, Frost, Ember.
Ember recorded the highest wind speed immediately after the eye pa... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Zephyr, the Nimbus, and the Cinder, navigated through a cyclone. The Zephyr logged calm conditions for 38 minutes. The Nimbus enjoyed calm for longer than the Zephyr but less time than the Cinder. The Cinder reported the peak wind velocity after the eye moved past, while the Zephyr reported... | Zephyr calm duration = 38 minutes.
Nimbus calm duration = 45 minutes.
Nimbus calm duration > Zephyr calm duration (45 > 38).
Nimbus calm duration < Cinder calm duration (45 < 70).
Cinder calm duration > 45 minutes.
Order by calm duration: Zephyr, Nimbus, Cinder.
Cinder recorded the highest wind speed immediately after... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Odyssey, the Tempest, and the Frost, navigated through a cyclone. The Odyssey logged calm conditions for 13 minutes. The Tempest enjoyed calm for longer than the Odyssey but less time than the Frost. The Frost reported the peak wind velocity after the eye moved past, while the Odyssey repor... | Odyssey calm duration = 13 minutes.
Tempest calm duration = 30 minutes.
Tempest calm duration > Odyssey calm duration (30 > 13).
Tempest calm duration < Frost calm duration (30 < 37).
Frost calm duration > 30 minutes.
Order by calm duration: Odyssey, Tempest, Frost.
Frost recorded the highest wind speed immediately af... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Cinder, Vanguard, and Nimbus were in the eye. The Cinder had 15 minutes of calm. The Vanguard’s calm period was longer than the Cinder’s but shorter than the Nimbus’s. The Nimbus recorded the strongest winds after the eye, and the Cinder the weakest. If the Vanguard stayed calm for 22 ... | Cinder calm duration = 15 minutes.
Vanguard calm duration = 22 minutes.
Vanguard calm duration > Cinder calm duration (22 > 15).
Vanguard calm duration < Nimbus calm duration (22 < 28).
Nimbus calm duration > 22 minutes.
Order by calm duration: Cinder, Vanguard, Nimbus.
Nimbus recorded the highest wind speed immediate... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Ivory, Tempest, and Frost were in the eye. The Ivory had 11 minutes of calm. The Tempest’s calm period was longer than the Ivory’s but shorter than the Frost’s. The Frost recorded the strongest winds after the eye, and the Ivory the weakest. If the Tempest stayed calm for 18 minutes, o... | Ivory calm duration = 11 minutes.
Tempest calm duration = 18 minutes.
Tempest calm duration > Ivory calm duration (18 > 11).
Tempest calm duration < Frost calm duration (18 < 34).
Frost calm duration > 18 minutes.
Order by calm duration: Ivory, Tempest, Frost.
Frost recorded the highest wind speed immediately after th... | tp_logic | bdff3e24db | general |
Question: Three vessels, the Tempest, the Cinder, and the Frost, navigated through a cyclone. The Tempest logged calm conditions for 31 minutes. The Cinder enjoyed calm for longer than the Tempest but less time than the Frost. The Frost reported the peak wind velocity after the eye moved past, while the Tempest reporte... | Tempest calm duration = 31 minutes.
Cinder calm duration = 39 minutes.
Cinder calm duration > Tempest calm duration (39 > 31).
Cinder calm duration < Frost calm duration (39 < 45).
Frost calm duration > 39 minutes.
Order by calm duration: Tempest, Cinder, Frost.
Frost recorded the highest wind speed immediately after ... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Tempest, Ember, and Nimbus were in the eye. The Tempest had 14 minutes of calm. The Ember’s calm period was longer than the Tempest’s but shorter than the Nimbus’s. The Nimbus recorded the strongest winds after the eye, and the Tempest the weakest. If the Ember stayed calm for 22 minut... | Tempest calm duration = 14 minutes.
Ember calm duration = 22 minutes.
Ember calm duration > Tempest calm duration (22 > 14).
Ember calm duration < Nimbus calm duration (22 < 38).
Nimbus calm duration > 22 minutes.
Order by calm duration: Tempest, Ember, Nimbus.
Nimbus recorded the highest wind speed immediately after ... | tp_logic | bdff3e24db | general |
Question: During a hurricane, the Vanguard, Zephyr, and Tempest were in the eye. The Vanguard had 11 minutes of calm. The Zephyr’s calm period was longer than the Vanguard’s but shorter than the Tempest’s. The Tempest recorded the strongest winds after the eye, and the Vanguard the weakest. If the Zephyr stayed calm fo... | Vanguard calm duration = 11 minutes.
Zephyr calm duration = 23 minutes.
Zephyr calm duration > Vanguard calm duration (23 > 11).
Zephyr calm duration < Tempest calm duration (23 < 53).
Tempest calm duration > 23 minutes.
Order by calm duration: Vanguard, Zephyr, Tempest.
Tempest recorded the highest wind speed immedia... | tp_logic | bdff3e24db | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 23, 26, 5, 14, 13, 4 minutes, respectively. The holder with the 14-minute processing time (designated as Beta) requires a mandatory 3-minute coolant cycle before it can be placed in the drying chamber, while all others req... | Total machining time for all 6 holders is 23 + 26 + 5 + 14 + 13 + 4 = 85 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 85 minutes.
The 3-minute coolant cycle for the 14-minute holder does not block the machine from starting the next part.
By scheduling the 14-minute ho... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 26, 8, 29 minutes, respectively. The holder with the 26-minute processing time (designated as Alpha) requires a mandatory 9-minute coolant cycle before it can be placed in the drying chamber, while all others require no su... | Total machining time for all 3 holders is 26 + 8 + 29 = 63 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 63 minutes.
The 9-minute coolant cycle for the 26-minute holder does not block the machine from starting the next part.
By scheduling the 26-minute holder early in ... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 9, 6, 28, 10, 17, 27 minutes, respectively. The holder with the 27-minute processing time (designated as Epsilon) requires a mandatory 10-minute coolant cycle before it can be placed in the drying chamber, while all others... | Total machining time for all 6 holders is 9 + 6 + 28 + 10 + 17 + 27 = 97 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 97 minutes.
The 10-minute coolant cycle for the 27-minute holder does not block the machine from starting the next part.
By scheduling the 27-minute h... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 19, 13, 9, 25, 16, 26 minutes, respectively. The holder with the 16-minute processing time (designated as Alpha) requires a mandatory 8-minute coolant cycle before it can be placed in the drying chamber, while all others r... | Total machining time for all 6 holders is 19 + 13 + 9 + 25 + 16 + 26 = 108 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 108 minutes.
The 8-minute coolant cycle for the 16-minute holder does not block the machine from starting the next part.
By scheduling the 16-minute... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 5, 25, 21, 19, 24, 23 minutes, respectively. The holder with the 24-minute processing time (designated as Gamma) requires a mandatory 4-minute coolant cycle before it can be placed in the drying chamber, while all others r... | Total machining time for all 6 holders is 5 + 25 + 21 + 19 + 24 + 23 = 117 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 117 minutes.
The 4-minute coolant cycle for the 24-minute holder does not block the machine from starting the next part.
By scheduling the 24-minute... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 27, 14, 19, 15, 20, 22 minutes, respectively. The holder with the 19-minute processing time (designated as Alpha) requires a mandatory 6-minute coolant cycle before it can be placed in the drying chamber, while all others ... | Total machining time for all 6 holders is 27 + 14 + 19 + 15 + 20 + 22 = 117 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 117 minutes.
The 6-minute coolant cycle for the 19-minute holder does not block the machine from starting the next part.
By scheduling the 19-minut... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 5 distinct wafer holders with processing times of 3, 9, 16, 2, 8 minutes, respectively. The holder with the 8-minute processing time (designated as Alpha) requires a mandatory 6-minute coolant cycle before it can be placed in the drying chamber, while all others require n... | Total machining time for all 5 holders is 3 + 9 + 16 + 2 + 8 = 38 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 38 minutes.
The 6-minute coolant cycle for the 8-minute holder does not block the machine from starting the next part.
By scheduling the 8-minute holder earl... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 27, 28, 21 minutes, respectively. The holder with the 27-minute processing time (designated as Delta) requires a mandatory 5-minute coolant cycle before it can be placed in the drying chamber, while all others require no s... | Total machining time for all 3 holders is 27 + 28 + 21 = 76 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 76 minutes.
The 5-minute coolant cycle for the 27-minute holder does not block the machine from starting the next part.
By scheduling the 27-minute holder early in... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 12, 4, 24, 26, 5, 3 minutes, respectively. The holder with the 3-minute processing time (designated as Zeta) requires a mandatory 3-minute coolant cycle before it can be placed in the drying chamber, while all others requi... | Total machining time for all 6 holders is 12 + 4 + 24 + 26 + 5 + 3 = 74 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 74 minutes.
The 3-minute coolant cycle for the 3-minute holder does not block the machine from starting the next part.
By scheduling the 3-minute holde... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 4 distinct wafer holders with processing times of 2, 17, 4, 25 minutes, respectively. The holder with the 25-minute processing time (designated as Zeta) requires a mandatory 3-minute coolant cycle before it can be placed in the drying chamber, while all others require no ... | Total machining time for all 4 holders is 2 + 17 + 4 + 25 = 48 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 48 minutes.
The 3-minute coolant cycle for the 25-minute holder does not block the machine from starting the next part.
By scheduling the 25-minute holder early... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 4 distinct wafer holders with processing times of 19, 4, 15, 7 minutes, respectively. The holder with the 4-minute processing time (designated as Epsilon) requires a mandatory 7-minute coolant cycle before it can be placed in the drying chamber, while all others require n... | Total machining time for all 4 holders is 19 + 4 + 15 + 7 = 45 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 45 minutes.
The 7-minute coolant cycle for the 4-minute holder does not block the machine from starting the next part.
By scheduling the 4-minute holder early i... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 5 distinct wafer holders with processing times of 10, 2, 15, 7, 23 minutes, respectively. The holder with the 7-minute processing time (designated as Gamma) requires a mandatory 7-minute coolant cycle before it can be placed in the drying chamber, while all others require... | Total machining time for all 5 holders is 10 + 2 + 15 + 7 + 23 = 57 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 57 minutes.
The 7-minute coolant cycle for the 7-minute holder does not block the machine from starting the next part.
By scheduling the 7-minute holder ea... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 5 distinct wafer holders with processing times of 7, 6, 14, 8, 21 minutes, respectively. The holder with the 7-minute processing time (designated as Epsilon) requires a mandatory 6-minute coolant cycle before it can be placed in the drying chamber, while all others requir... | Total machining time for all 5 holders is 7 + 6 + 14 + 8 + 21 = 56 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 56 minutes.
The 6-minute coolant cycle for the 7-minute holder does not block the machine from starting the next part.
By scheduling the 7-minute holder ear... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 26, 10, 24, 25, 27, 7 minutes, respectively. The holder with the 27-minute processing time (designated as Delta) requires a mandatory 10-minute coolant cycle before it can be placed in the drying chamber, while all others ... | Total machining time for all 6 holders is 26 + 10 + 24 + 25 + 27 + 7 = 119 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 119 minutes.
The 10-minute coolant cycle for the 27-minute holder does not block the machine from starting the next part.
By scheduling the 27-minut... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 9, 10, 3 minutes, respectively. The holder with the 10-minute processing time (designated as Gamma) requires a mandatory 7-minute coolant cycle before it can be placed in the drying chamber, while all others require no suc... | Total machining time for all 3 holders is 9 + 10 + 3 = 22 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 22 minutes.
The 7-minute coolant cycle for the 10-minute holder does not block the machine from starting the next part.
By scheduling the 10-minute holder early in t... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 26, 11, 17 minutes, respectively. The holder with the 17-minute processing time (designated as Beta) requires a mandatory 7-minute coolant cycle before it can be placed in the drying chamber, while all others require no su... | Total machining time for all 3 holders is 26 + 11 + 17 = 54 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 54 minutes.
The 7-minute coolant cycle for the 17-minute holder does not block the machine from starting the next part.
By scheduling the 17-minute holder early in... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 5 distinct wafer holders with processing times of 25, 14, 19, 13, 7 minutes, respectively. The holder with the 25-minute processing time (designated as Epsilon) requires a mandatory 6-minute coolant cycle before it can be placed in the drying chamber, while all others req... | Total machining time for all 5 holders is 25 + 14 + 19 + 13 + 7 = 78 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 78 minutes.
The 6-minute coolant cycle for the 25-minute holder does not block the machine from starting the next part.
By scheduling the 25-minute holder... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 22, 15, 8, 5, 13, 11 minutes, respectively. The holder with the 22-minute processing time (designated as Epsilon) requires a mandatory 5-minute coolant cycle before it can be placed in the drying chamber, while all others ... | Total machining time for all 6 holders is 22 + 15 + 8 + 5 + 13 + 11 = 74 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 74 minutes.
The 5-minute coolant cycle for the 22-minute holder does not block the machine from starting the next part.
By scheduling the 22-minute ho... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 22, 26, 14, 24, 5, 23 minutes, respectively. The holder with the 26-minute processing time (designated as Delta) requires a mandatory 10-minute coolant cycle before it can be placed in the drying chamber, while all others ... | Total machining time for all 6 holders is 22 + 26 + 14 + 24 + 5 + 23 = 114 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 114 minutes.
The 10-minute coolant cycle for the 26-minute holder does not block the machine from starting the next part.
By scheduling the 26-minut... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 12, 8, 5 minutes, respectively. The holder with the 12-minute processing time (designated as Alpha) requires a mandatory 8-minute coolant cycle before it can be placed in the drying chamber, while all others require no suc... | Total machining time for all 3 holders is 12 + 8 + 5 = 25 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 25 minutes.
The 8-minute coolant cycle for the 12-minute holder does not block the machine from starting the next part.
By scheduling the 12-minute holder early in t... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 2, 16, 26 minutes, respectively. The holder with the 16-minute processing time (designated as Delta) requires a mandatory 10-minute coolant cycle before it can be placed in the drying chamber, while all others require no s... | Total machining time for all 3 holders is 2 + 16 + 26 = 44 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 44 minutes.
The 10-minute coolant cycle for the 16-minute holder does not block the machine from starting the next part.
By scheduling the 16-minute holder early in... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 4 distinct wafer holders with processing times of 20, 9, 10, 19 minutes, respectively. The holder with the 19-minute processing time (designated as Gamma) requires a mandatory 10-minute coolant cycle before it can be placed in the drying chamber, while all others require ... | Total machining time for all 4 holders is 20 + 9 + 10 + 19 = 58 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 58 minutes.
The 10-minute coolant cycle for the 19-minute holder does not block the machine from starting the next part.
By scheduling the 19-minute holder ear... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 4 distinct wafer holders with processing times of 15, 21, 13, 4 minutes, respectively. The holder with the 4-minute processing time (designated as Gamma) requires a mandatory 9-minute coolant cycle before it can be placed in the drying chamber, while all others require no... | Total machining time for all 4 holders is 15 + 21 + 13 + 4 = 53 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 53 minutes.
The 9-minute coolant cycle for the 4-minute holder does not block the machine from starting the next part.
By scheduling the 4-minute holder early ... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 24, 16, 17, 6, 15, 11 minutes, respectively. The holder with the 24-minute processing time (designated as Alpha) requires a mandatory 7-minute coolant cycle before it can be placed in the drying chamber, while all others r... | Total machining time for all 6 holders is 24 + 16 + 17 + 6 + 15 + 11 = 89 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 89 minutes.
The 7-minute coolant cycle for the 24-minute holder does not block the machine from starting the next part.
By scheduling the 24-minute h... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 17, 29, 14 minutes, respectively. The holder with the 29-minute processing time (designated as Beta) requires a mandatory 9-minute coolant cycle before it can be placed in the drying chamber, while all others require no su... | Total machining time for all 3 holders is 17 + 29 + 14 = 60 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 60 minutes.
The 9-minute coolant cycle for the 29-minute holder does not block the machine from starting the next part.
By scheduling the 29-minute holder early in... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 4 distinct wafer holders with processing times of 3, 8, 13, 9 minutes, respectively. The holder with the 8-minute processing time (designated as Alpha) requires a mandatory 7-minute coolant cycle before it can be placed in the drying chamber, while all others require no s... | Total machining time for all 4 holders is 3 + 8 + 13 + 9 = 33 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 33 minutes.
The 7-minute coolant cycle for the 8-minute holder does not block the machine from starting the next part.
By scheduling the 8-minute holder early in... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 17, 10, 14 minutes, respectively. The holder with the 14-minute processing time (designated as Zeta) requires a mandatory 5-minute coolant cycle before it can be placed in the drying chamber, while all others require no su... | Total machining time for all 3 holders is 17 + 10 + 14 = 41 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 41 minutes.
The 5-minute coolant cycle for the 14-minute holder does not block the machine from starting the next part.
By scheduling the 14-minute holder early in... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 5, 4, 19 minutes, respectively. The holder with the 4-minute processing time (designated as Zeta) requires a mandatory 4-minute coolant cycle before it can be placed in the drying chamber, while all others require no such ... | Total machining time for all 3 holders is 5 + 4 + 19 = 28 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 28 minutes.
The 4-minute coolant cycle for the 4-minute holder does not block the machine from starting the next part.
By scheduling the 4-minute holder early in the... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 21, 14, 22, 10, 8, 16 minutes, respectively. The holder with the 22-minute processing time (designated as Zeta) requires a mandatory 9-minute coolant cycle before it can be placed in the drying chamber, while all others re... | Total machining time for all 6 holders is 21 + 14 + 22 + 10 + 8 + 16 = 91 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 91 minutes.
The 9-minute coolant cycle for the 22-minute holder does not block the machine from starting the next part.
By scheduling the 22-minute h... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 5 distinct wafer holders with processing times of 24, 21, 18, 7, 25 minutes, respectively. The holder with the 25-minute processing time (designated as Delta) requires a mandatory 9-minute coolant cycle before it can be placed in the drying chamber, while all others requi... | Total machining time for all 5 holders is 24 + 21 + 18 + 7 + 25 = 95 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 95 minutes.
The 9-minute coolant cycle for the 25-minute holder does not block the machine from starting the next part.
By scheduling the 25-minute holder... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 15, 26, 21 minutes, respectively. The holder with the 15-minute processing time (designated as Gamma) requires a mandatory 4-minute coolant cycle before it can be placed in the drying chamber, while all others require no s... | Total machining time for all 3 holders is 15 + 26 + 21 = 62 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 62 minutes.
The 4-minute coolant cycle for the 15-minute holder does not block the machine from starting the next part.
By scheduling the 15-minute holder early in... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 3, 29, 12 minutes, respectively. The holder with the 29-minute processing time (designated as Epsilon) requires a mandatory 1-minute coolant cycle before it can be placed in the drying chamber, while all others require no ... | Total machining time for all 3 holders is 3 + 29 + 12 = 44 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 44 minutes.
The 1-minute coolant cycle for the 29-minute holder does not block the machine from starting the next part.
By scheduling the 29-minute holder early in ... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 22, 19, 15, 7, 12, 8 minutes, respectively. The holder with the 7-minute processing time (designated as Alpha) requires a mandatory 5-minute coolant cycle before it can be placed in the drying chamber, while all others req... | Total machining time for all 6 holders is 22 + 19 + 15 + 7 + 12 + 8 = 83 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 83 minutes.
The 5-minute coolant cycle for the 7-minute holder does not block the machine from starting the next part.
By scheduling the 7-minute hold... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 4 distinct wafer holders with processing times of 25, 10, 16, 4 minutes, respectively. The holder with the 25-minute processing time (designated as Beta) requires a mandatory 4-minute coolant cycle before it can be placed in the drying chamber, while all others require no... | Total machining time for all 4 holders is 25 + 10 + 16 + 4 = 55 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 55 minutes.
The 4-minute coolant cycle for the 25-minute holder does not block the machine from starting the next part.
By scheduling the 25-minute holder earl... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 22, 4, 5 minutes, respectively. The holder with the 4-minute processing time (designated as Epsilon) requires a mandatory 2-minute coolant cycle before it can be placed in the drying chamber, while all others require no su... | Total machining time for all 3 holders is 22 + 4 + 5 = 31 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 31 minutes.
The 2-minute coolant cycle for the 4-minute holder does not block the machine from starting the next part.
By scheduling the 4-minute holder early in the... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 6, 10, 7, 4, 3, 14 minutes, respectively. The holder with the 6-minute processing time (designated as Epsilon) requires a mandatory 9-minute coolant cycle before it can be placed in the drying chamber, while all others req... | Total machining time for all 6 holders is 6 + 10 + 7 + 4 + 3 + 14 = 44 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 44 minutes.
The 9-minute coolant cycle for the 6-minute holder does not block the machine from starting the next part.
By scheduling the 6-minute holder... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 6 distinct wafer holders with processing times of 24, 25, 23, 4, 28, 26 minutes, respectively. The holder with the 24-minute processing time (designated as Zeta) requires a mandatory 2-minute coolant cycle before it can be placed in the drying chamber, while all others re... | Total machining time for all 6 holders is 24 + 25 + 23 + 4 + 28 + 26 = 130 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 130 minutes.
The 2-minute coolant cycle for the 24-minute holder does not block the machine from starting the next part.
By scheduling the 24-minute... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 16, 23, 17 minutes, respectively. The holder with the 17-minute processing time (designated as Delta) requires a mandatory 2-minute coolant cycle before it can be placed in the drying chamber, while all others require no s... | Total machining time for all 3 holders is 16 + 23 + 17 = 56 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 56 minutes.
The 2-minute coolant cycle for the 17-minute holder does not block the machine from starting the next part.
By scheduling the 17-minute holder early in... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 3 distinct wafer holders with processing times of 4, 10, 6 minutes, respectively. The holder with the 4-minute processing time (designated as Epsilon) requires a mandatory 6-minute coolant cycle before it can be placed in the drying chamber, while all others require no su... | Total machining time for all 3 holders is 4 + 10 + 6 = 20 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 20 minutes.
The 6-minute coolant cycle for the 4-minute holder does not block the machine from starting the next part.
By scheduling the 4-minute holder early in the... | tp_planning | fb2271e70e | general |
Question: A high-speed CNC machine must machine 4 distinct wafer holders with processing times of 8, 23, 5, 3 minutes, respectively. The holder with the 23-minute processing time (designated as Gamma) requires a mandatory 7-minute coolant cycle before it can be placed in the drying chamber, while all others require no ... | Total machining time for all 4 holders is 8 + 23 + 5 + 3 = 39 minutes.
The machine operates non-stop, so the earliest possible completion of all machining is 39 minutes.
The 7-minute coolant cycle for the 23-minute holder does not block the machine from starting the next part.
By scheduling the 23-minute holder early ... | tp_planning | fb2271e70e | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {H, F, B}. Times are: A to H: 8h, A to F: 3h, A to B: 9h, H to E: 7h, F to E: 3h, B to E: 4h. Constraint: total time <= 9h. List valid paths as "Start-Intermediate-End".
Answer: | A-H-E: 8 + 7 = 15
A-F-E: 3 + 3 = 6
A-B-E: 9 + 4 = 13
Valid paths: A-F-E
#### A-F-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {B, C, H}. The travel times (in hours) are: A -> B = 3, A -> C = 7, A -> H = 6, B -> E = 10, C -> E = 7, H -> E = 10. The total journey time must not exceed 13 hours. List all valid paths in the format "Start-Intermediate... | A-B-E: 3 + 10 = 13
A-C-E: 7 + 7 = 14
A-H-E: 6 + 10 = 16
Valid paths: A-B-E
#### A-B-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {H, F, G}. Times are: A to H: 3h, A to F: 5h, A to G: 8h, H to E: 3h, F to E: 10h, G to E: 10h. Constraint: total time <= 7h. List valid paths as "Start-Intermediate-End".
Answer: | A-H-E: 3 + 3 = 6
A-F-E: 5 + 10 = 15
A-G-E: 8 + 10 = 18
Valid paths: A-H-E
#### A-H-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {D, G, F}. Times are: A to D: 8h, A to G: 9h, A to F: 8h, D to E: 7h, G to E: 1h, F to E: 6h. Constraint: total time <= 10h. List valid paths as "Start-Intermediate-End".
Answer: | A-D-E: 8 + 7 = 15
A-G-E: 9 + 1 = 10
A-F-E: 8 + 6 = 14
Valid paths: A-G-E
#### A-G-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {C, B, F}. The travel times (in hours) are: A -> C = 1, A -> B = 3, A -> F = 10, C -> E = 6, B -> E = 2, F -> E = 9. The total journey time must not exceed 8 hours. List all valid paths in the format "Start-Intermediate-E... | A-C-E: 1 + 6 = 7
A-B-E: 3 + 2 = 5
A-F-E: 10 + 9 = 19
Valid paths: A-C-E, A-B-E
#### A-C-E, A-B-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {F, H, G}. Times are: A to F: 6h, A to H: 9h, A to G: 3h, F to E: 8h, H to E: 2h, G to E: 10h. Constraint: total time <= 12h. List valid paths as "Start-Intermediate-End".
Answer: | A-F-E: 6 + 8 = 14
A-H-E: 9 + 2 = 11
A-G-E: 3 + 10 = 13
Valid paths: A-H-E
#### A-H-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {C, D, B}. The travel times (in hours) are: A -> C = 4, A -> D = 10, A -> B = 6, C -> E = 1, D -> E = 4, B -> E = 9. The total journey time must not exceed 9 hours. List all valid paths in the format "Start-Intermediate-E... | A-C-E: 4 + 1 = 5
A-D-E: 10 + 4 = 14
A-B-E: 6 + 9 = 15
Valid paths: A-C-E
#### A-C-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {C, B, G}. Times are: A to C: 4h, A to B: 9h, A to G: 1h, C to E: 4h, B to E: 9h, G to E: 1h. Constraint: total time <= 16h. List valid paths as "Start-Intermediate-End".
Answer: | A-C-E: 4 + 4 = 8
A-B-E: 9 + 9 = 18
A-G-E: 1 + 1 = 2
Valid paths: A-C-E, A-G-E
#### A-C-E, A-G-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {F, D, G}. The travel times (in hours) are: A -> F = 1, A -> D = 3, A -> G = 10, F -> E = 2, D -> E = 10, G -> E = 6. The total journey time must not exceed 13 hours. List all valid paths in the format "Start-Intermediate... | A-F-E: 1 + 2 = 3
A-D-E: 3 + 10 = 13
A-G-E: 10 + 6 = 16
Valid paths: A-F-E, A-D-E
#### A-F-E, A-D-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {F, B, C}. The travel times (in hours) are: A -> F = 3, A -> B = 9, A -> C = 4, F -> E = 4, B -> E = 5, C -> E = 2. The total journey time must not exceed 6 hours. List all valid paths in the format "Start-Intermediate-En... | A-F-E: 3 + 4 = 7
A-B-E: 9 + 5 = 14
A-C-E: 4 + 2 = 6
Valid paths: A-C-E
#### A-C-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {G, H, C}. The travel times (in hours) are: A -> G = 7, A -> H = 7, A -> C = 7, G -> E = 3, H -> E = 3, C -> E = 7. The total journey time must not exceed 11 hours. List all valid paths in the format "Start-Intermediate-E... | A-G-E: 7 + 3 = 10
A-H-E: 7 + 3 = 10
A-C-E: 7 + 7 = 14
Valid paths: A-G-E, A-H-E
#### A-G-E, A-H-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {B, D, H}. Times are: A to B: 8h, A to D: 7h, A to H: 8h, B to E: 9h, D to E: 5h, H to E: 3h. Constraint: total time <= 11h. List valid paths as "Start-Intermediate-End".
Answer: | A-B-E: 8 + 9 = 17
A-D-E: 7 + 5 = 12
A-H-E: 8 + 3 = 11
Valid paths: A-H-E
#### A-H-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {G, D, C}. The travel times (in hours) are: A -> G = 10, A -> D = 1, A -> C = 6, G -> E = 5, D -> E = 7, C -> E = 9. The total journey time must not exceed 12 hours. List all valid paths in the format "Start-Intermediate-... | A-G-E: 10 + 5 = 15
A-D-E: 1 + 7 = 8
A-C-E: 6 + 9 = 15
Valid paths: A-D-E
#### A-D-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {D, F, C}. The travel times (in hours) are: A -> D = 7, A -> F = 1, A -> C = 7, D -> E = 4, F -> E = 5, C -> E = 1. The total journey time must not exceed 8 hours. List all valid paths in the format "Start-Intermediate-En... | A-D-E: 7 + 4 = 11
A-F-E: 1 + 5 = 6
A-C-E: 7 + 1 = 8
Valid paths: A-F-E, A-C-E
#### A-F-E, A-C-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {C, G, B}. Times are: A to C: 7h, A to G: 7h, A to B: 10h, C to E: 10h, G to E: 3h, B to E: 8h. Constraint: total time <= 17h. List valid paths as "Start-Intermediate-End".
Answer: | A-C-E: 7 + 10 = 17
A-G-E: 7 + 3 = 10
A-B-E: 10 + 8 = 18
Valid paths: A-C-E, A-G-E
#### A-C-E, A-G-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {B, D, F}. The travel times (in hours) are: A -> B = 5, A -> D = 7, A -> F = 10, B -> E = 5, D -> E = 8, F -> E = 10. The total journey time must not exceed 10 hours. List all valid paths in the format "Start-Intermediate... | A-B-E: 5 + 5 = 10
A-D-E: 7 + 8 = 15
A-F-E: 10 + 10 = 20
Valid paths: A-B-E
#### A-B-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {F, D, H}. Times are: A to F: 2h, A to D: 6h, A to H: 8h, F to E: 1h, D to E: 8h, H to E: 9h. Constraint: total time <= 15h. List valid paths as "Start-Intermediate-End".
Answer: | A-F-E: 2 + 1 = 3
A-D-E: 6 + 8 = 14
A-H-E: 8 + 9 = 17
Valid paths: A-F-E, A-D-E
#### A-F-E, A-D-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {C, H, F}. Times are: A to C: 5h, A to H: 2h, A to F: 5h, C to E: 5h, H to E: 1h, F to E: 5h. Constraint: total time <= 9h. List valid paths as "Start-Intermediate-End".
Answer: | A-C-E: 5 + 5 = 10
A-H-E: 2 + 1 = 3
A-F-E: 5 + 5 = 10
Valid paths: A-H-E
#### A-H-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {H, F, B}. The travel times (in hours) are: A -> H = 10, A -> F = 6, A -> B = 4, H -> E = 3, F -> E = 9, B -> E = 7. The total journey time must not exceed 12 hours. List all valid paths in the format "Start-Intermediate-... | A-H-E: 10 + 3 = 13
A-F-E: 6 + 9 = 15
A-B-E: 4 + 7 = 11
Valid paths: A-B-E
#### A-B-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {D, C, B}. Times are: A to D: 8h, A to C: 10h, A to B: 9h, D to E: 4h, C to E: 5h, B to E: 7h. Constraint: total time <= 15h. List valid paths as "Start-Intermediate-End".
Answer: | A-D-E: 8 + 4 = 12
A-C-E: 10 + 5 = 15
A-B-E: 9 + 7 = 16
Valid paths: A-D-E, A-C-E
#### A-D-E, A-C-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {F, B, H}. Times are: A to F: 5h, A to B: 3h, A to H: 10h, F to E: 5h, B to E: 6h, H to E: 7h. Constraint: total time <= 13h. List valid paths as "Start-Intermediate-End".
Answer: | A-F-E: 5 + 5 = 10
A-B-E: 3 + 6 = 9
A-H-E: 10 + 7 = 17
Valid paths: A-F-E, A-B-E
#### A-F-E, A-B-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {H, G, C}. The travel times (in hours) are: A -> H = 5, A -> G = 9, A -> C = 7, H -> E = 10, G -> E = 7, C -> E = 7. The total journey time must not exceed 15 hours. List all valid paths in the format "Start-Intermediate-... | A-H-E: 5 + 10 = 15
A-G-E: 9 + 7 = 16
A-C-E: 7 + 7 = 14
Valid paths: A-H-E, A-C-E
#### A-H-E, A-C-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {D, F, C}. Times are: A to D: 9h, A to F: 2h, A to C: 6h, D to E: 4h, F to E: 7h, C to E: 1h. Constraint: total time <= 9h. List valid paths as "Start-Intermediate-End".
Answer: | A-D-E: 9 + 4 = 13
A-F-E: 2 + 7 = 9
A-C-E: 6 + 1 = 7
Valid paths: A-F-E, A-C-E
#### A-F-E, A-C-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {G, H, F}. Times are: A to G: 5h, A to H: 1h, A to F: 7h, G to E: 6h, H to E: 6h, F to E: 6h. Constraint: total time <= 10h. List valid paths as "Start-Intermediate-End".
Answer: | A-G-E: 5 + 6 = 11
A-H-E: 1 + 6 = 7
A-F-E: 7 + 6 = 13
Valid paths: A-H-E
#### A-H-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {G, B, F}. Times are: A to G: 8h, A to B: 9h, A to F: 6h, G to E: 6h, B to E: 7h, F to E: 2h. Constraint: total time <= 10h. List valid paths as "Start-Intermediate-End".
Answer: | A-G-E: 8 + 6 = 14
A-B-E: 9 + 7 = 16
A-F-E: 6 + 2 = 8
Valid paths: A-F-E
#### A-F-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {G, B, C}. Times are: A to G: 4h, A to B: 4h, A to C: 7h, G to E: 6h, B to E: 8h, C to E: 6h. Constraint: total time <= 10h. List valid paths as "Start-Intermediate-End".
Answer: | A-G-E: 4 + 6 = 10
A-B-E: 4 + 8 = 12
A-C-E: 7 + 6 = 13
Valid paths: A-G-E
#### A-G-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {B, D, F}. The travel times (in hours) are: A -> B = 4, A -> D = 10, A -> F = 7, B -> E = 8, D -> E = 9, F -> E = 6. The total journey time must not exceed 18 hours. List all valid paths in the format "Start-Intermediate-... | A-B-E: 4 + 8 = 12
A-D-E: 10 + 9 = 19
A-F-E: 7 + 6 = 13
Valid paths: A-B-E, A-F-E
#### A-B-E, A-F-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {B, H, G}. Times are: A to B: 4h, A to H: 1h, A to G: 10h, B to E: 7h, H to E: 9h, G to E: 1h. Constraint: total time <= 10h. List valid paths as "Start-Intermediate-End".
Answer: | A-B-E: 4 + 7 = 11
A-H-E: 1 + 9 = 10
A-G-E: 10 + 1 = 11
Valid paths: A-H-E
#### A-H-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {F, G, H}. The travel times (in hours) are: A -> F = 4, A -> G = 8, A -> H = 6, F -> E = 9, G -> E = 7, H -> E = 4. The total journey time must not exceed 10 hours. List all valid paths in the format "Start-Intermediate-E... | A-F-E: 4 + 9 = 13
A-G-E: 8 + 7 = 15
A-H-E: 6 + 4 = 10
Valid paths: A-H-E
#### A-H-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {G, D, C}. Times are: A to G: 5h, A to D: 7h, A to C: 6h, G to E: 2h, D to E: 5h, C to E: 6h. Constraint: total time <= 9h. List valid paths as "Start-Intermediate-End".
Answer: | A-G-E: 5 + 2 = 7
A-D-E: 7 + 5 = 12
A-C-E: 6 + 6 = 12
Valid paths: A-G-E
#### A-G-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {F, B, C}. The travel times (in hours) are: A -> F = 8, A -> B = 9, A -> C = 7, F -> E = 2, B -> E = 8, C -> E = 3. The total journey time must not exceed 16 hours. List all valid paths in the format "Start-Intermediate-E... | A-F-E: 8 + 2 = 10
A-B-E: 9 + 8 = 17
A-C-E: 7 + 3 = 10
Valid paths: A-F-E, A-C-E
#### A-F-E, A-C-E | tp_planning | 41854a68c5 | general |
Question: A routing problem: A train travels from Node A to Node E with one stop at a node chosen from {B, G, H}. Times are: A to B: 6h, A to G: 1h, A to H: 6h, B to E: 5h, G to E: 8h, H to E: 7h. Constraint: total time <= 12h. List valid paths as "Start-Intermediate-End".
Answer: | A-B-E: 6 + 5 = 11
A-G-E: 1 + 8 = 9
A-H-E: 6 + 7 = 13
Valid paths: A-B-E, A-G-E
#### A-B-E, A-G-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {H, G, F}. The travel times (in hours) are: A -> H = 4, A -> G = 8, A -> F = 5, H -> E = 4, G -> E = 1, F -> E = 6. The total journey time must not exceed 8 hours. List all valid paths in the format "Start-Intermediate-En... | A-H-E: 4 + 4 = 8
A-G-E: 8 + 1 = 9
A-F-E: 5 + 6 = 11
Valid paths: A-H-E
#### A-H-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {D, H, C}. The travel times (in hours) are: A -> D = 2, A -> H = 4, A -> C = 1, D -> E = 7, H -> E = 7, C -> E = 3. The total journey time must not exceed 10 hours. List all valid paths in the format "Start-Intermediate-E... | A-D-E: 2 + 7 = 9
A-H-E: 4 + 7 = 11
A-C-E: 1 + 3 = 4
Valid paths: A-D-E, A-C-E
#### A-D-E, A-C-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {G, H, B}. The travel times (in hours) are: A -> G = 2, A -> H = 4, A -> B = 7, G -> E = 4, H -> E = 3, B -> E = 6. The total journey time must not exceed 8 hours. List all valid paths in the format "Start-Intermediate-En... | A-G-E: 2 + 4 = 6
A-H-E: 4 + 3 = 7
A-B-E: 7 + 6 = 13
Valid paths: A-G-E, A-H-E
#### A-G-E, A-H-E | tp_planning | 41854a68c5 | general |
Question: A train must travel from Node A to Node E via exactly one intermediate node from the set {C, H, F}. The travel times (in hours) are: A -> C = 2, A -> H = 1, A -> F = 7, C -> E = 1, H -> E = 9, F -> E = 4. The total journey time must not exceed 7 hours. List all valid paths in the format "Start-Intermediate-En... | A-C-E: 2 + 1 = 3
A-H-E: 1 + 9 = 10
A-F-E: 7 + 4 = 11
Valid paths: A-C-E
#### A-C-E | tp_planning | 41854a68c5 | general |