meter logs
Browse files- logs/d3a18c7c_sm_tpL1.log +13 -0
logs/d3a18c7c_sm_tpL1.log
CHANGED
|
@@ -1,2 +1,15 @@
|
|
| 1 |
[transformers] This model config has set a `rope_parameters['original_max_position_embeddings']` field, to be used together with `max_position_embeddings` to determine a scaling factor. Please set the `factor` field of `rope_parameters`with this ratio instead -- we recommend the use of this field over `original_max_position_embeddings`, as it is compatible with most model architectures.
|
| 2 |
12:36:57 checkpoint sft/tpL1_final.pt step 1000: 400 held-out template problems
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
[transformers] This model config has set a `rope_parameters['original_max_position_embeddings']` field, to be used together with `max_position_embeddings` to determine a scaling factor. Please set the `factor` field of `rope_parameters`with this ratio instead -- we recommend the use of this field over `original_max_position_embeddings`, as it is compatible with most model architectures.
|
| 2 |
12:36:57 checkpoint sft/tpL1_final.pt step 1000: 400 held-out template problems
|
| 3 |
+
12:45:43 EX tp_probability | Q: Question: Quinn Johnson is preparing a quiz bowl with 10 distinct questions. They have prepared a bank of 12 potential questions. If they select 10 questions at | GOLD: 5/6 | OUT: he total number of ways to select 10 questions from 12 is C(12,1) = 12. / The total number of favorable outcomes is 10 * 12 = 10. / The probability is 10 / 10. / Simplifying the fraction by dividing numerator and denominator by 10 gives 10 / 10. / The fraction is 10 / 10. / The probability is 10/10. / #### 1/10
|
| 4 |
+
12:45:43 EX tp_science_calc | Q: Question: A large industrial tank contains a mixture of ideal gases. The temperature of the gas mixture is 349 K. What is the root-mean-square speed of the Argo | GOLD: 466 m/s | OUT: *g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g*g
|
| 5 |
+
12:45:43 EX tp_wordproblem | Q: Question: A network storage device is advertised to hold 9 Terabytes of data. If a specific file format uses 0.6 Gigabytes per file, and the device is currently | GOLD: 5100 | OUT: = 0.6 / File size = 9 Terabytes / Additional files = 0.6 * 9 Terabytes / 0.6 * 9 Terabytes = 0.6 / Additional files = 9 Terabytes / Full capacity = 0.6 / 0.6 / Full capacity = 0.6 / Additional files = 0.6 * 9 Terabytes / Additional files = 0.6 * 9 Terabytes / Additional files = 9 / 0.6 = 0.6 / Additional files = 9 / #### 9
|
| 6 |
+
12:45:43 EX tp_finance | Q: Question: Calculate the break-even point in units for the Riverside Workshop, which has fixed costs of $185,000, a variable cost of $67 per units, and a selling | GOLD: 1000 | OUT: ibution margin per unit = 252 / Contribution margin per unit = 252 / Break-even units = 185,000 / 252 / Break-even units = 0.75000 / Break-even units = 0.75000 / Total fixed costs = 185,000 / Break-even units = 185,000 / 252 / Break-even units = 0.75000 / Break-even units = 0.75000 / Break-even units = 0.75000 / #### 0
|
| 7 |
+
12:45:43 TASK tp_deduction correct 1/2 reached_#### 2
|
| 8 |
+
12:45:43 TASK tp_finance correct 1/86 reached_#### 75
|
| 9 |
+
12:45:43 TASK tp_logic correct 3/40 reached_#### 29
|
| 10 |
+
12:45:43 TASK tp_planning correct 4/33 reached_#### 30
|
| 11 |
+
12:45:43 TASK tp_probability correct 1/57 reached_#### 56
|
| 12 |
+
12:45:43 TASK tp_science_calc correct 0/59 reached_#### 49
|
| 13 |
+
12:45:43 TASK tp_wordproblem correct 0/123 reached_#### 108
|
| 14 |
+
12:45:43 TMETER sft/tpL1_final.pt step 1000: correct 10/400 (2.5%), reached #### 349/400
|
| 15 |
+
12:45:43 METER DONE
|