meter logs
Browse files- logs/c13083f2_sm_tpA8L.log +13 -0
- logs/c13083f2_sm_tpA9L.log +15 -0
logs/c13083f2_sm_tpA8L.log
CHANGED
|
@@ -1,2 +1,15 @@
|
|
| 1 |
[transformers] This model config has set a `rope_parameters['original_max_position_embeddings']` field, to be used together with `max_position_embeddings` to determine a scaling factor. Please set the `factor` field of `rope_parameters`with this ratio instead -- we recommend the use of this field over `original_max_position_embeddings`, as it is compatible with most model architectures.
|
| 2 |
13:15:02 checkpoint sft/tpA8_latest.pt step 2000: 400 held-out template problems
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
[transformers] This model config has set a `rope_parameters['original_max_position_embeddings']` field, to be used together with `max_position_embeddings` to determine a scaling factor. Please set the `factor` field of `rope_parameters`with this ratio instead -- we recommend the use of this field over `original_max_position_embeddings`, as it is compatible with most model architectures.
|
| 2 |
13:15:02 checkpoint sft/tpA8_latest.pt step 2000: 400 held-out template problems
|
| 3 |
+
13:23:48 EX tp_probability | Q: Question: Quinn Johnson is preparing a quiz bowl with 10 distinct questions. They have prepared a bank of 12 potential questions. If they select 10 questions at | GOLD: 5/6 | OUT: 10 / GCD of 10 and 12 = 1 / GCD(10, 12) = 1 / 1 / 10 = 1 / Probability = 1 / 10 / GCD(10, 12) = 1 / 1 / 12 = 1 / GCD(10, 12) = 1 / 1 / 12 = 1 / GCD(10, 12) = 1 / 1 / 12 = 1 / Probability = 1 / 10 / GCD(10, 12) = 1 / 1 / 12 = 1 / Probability = 1 / 10 / Simplified fraction = 1 / 10 / Simplify 1 / 10 = 10 / 1 = 10 / Probability = 1/10
|
| 4 |
+
13:23:48 EX tp_science_calc | Q: Question: A large industrial tank contains a mixture of ideal gases. The temperature of the gas mixture is 349 K. What is the root-mean-square speed of the Argo | GOLD: 466 m/s | OUT: ). / Substituting the given values gives v_Ar = sqrt(40.0 / 8.314). / Calculating the square root gives v_Ar = sqrt(40.000 / 8.314). / Simplifying the square root gives v_Ar = sqrt(1.0000000). / Dividing the square root gives v_Ar = sqrt(1.0000000). / Calculating the square root gives v_Ar ≈ 1.0000 m/s. / ####
|
| 5 |
+
13:23:48 EX tp_wordproblem | Q: Question: A network storage device is advertised to hold 9 Terabytes of data. If a specific file format uses 0.6 Gigabytes per file, and the device is currently | GOLD: 5100 | OUT: .66 0 = 0.66 / 0.6 = 0 / Full capacity = 9 - 0.6 = 16 / Full capacity = 16 / File size = 16 - 0.6 = 0.66 / Files per gig = 0.6 / Total files per gig = 0.6 * 0.6 = 0.6 / Full capacity = 16 / 16 = 16 / Full capacity = 16 / Full size = 16 - 16 = 16 / File size = 0.66 * 0.6 File = 0.66 / Maximum = 0.66 - 0.66 / Maximum = 0.6
|
| 6 |
+
13:23:48 EX tp_finance | Q: Question: Calculate the break-even point in units for the Riverside Workshop, which has fixed costs of $185,000, a variable cost of $67 per units, and a selling | GOLD: 1000 | OUT: x = 1,000.00 / x = 1,000.00 / x = 1,000.00 / Solving for x gives x = 1,000.00 / 1,000.00 / x = 1,000.00 / Solving for x gives x = 1,000.00 / x = 1,000.00 / Solving for x gives x = 1,000.00 / 25 / x = 1,000.00 / The required units are: / Break-even units = 1,000.00 / Substituting the given values: / x = 1,000.00 / #### 1,000
|
| 7 |
+
13:23:48 TASK tp_deduction correct 0/2 reached_#### 1
|
| 8 |
+
13:23:48 TASK tp_finance correct 2/86 reached_#### 31
|
| 9 |
+
13:23:48 TASK tp_logic correct 2/40 reached_#### 21
|
| 10 |
+
13:23:48 TASK tp_planning correct 0/33 reached_#### 12
|
| 11 |
+
13:23:48 TASK tp_probability correct 0/57 reached_#### 25
|
| 12 |
+
13:23:48 TASK tp_science_calc correct 0/59 reached_#### 13
|
| 13 |
+
13:23:48 TASK tp_wordproblem correct 0/123 reached_#### 41
|
| 14 |
+
13:23:48 TMETER sft/tpA8_latest.pt step 2000: correct 4/400 (1.0%), reached #### 144/400
|
| 15 |
+
13:23:48 METER DONE
|
logs/c13083f2_sm_tpA9L.log
ADDED
|
@@ -0,0 +1,15 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
[transformers] This model config has set a `rope_parameters['original_max_position_embeddings']` field, to be used together with `max_position_embeddings` to determine a scaling factor. Please set the `factor` field of `rope_parameters`with this ratio instead -- we recommend the use of this field over `original_max_position_embeddings`, as it is compatible with most model architectures.
|
| 2 |
+
13:24:14 checkpoint sft/tpA9_latest.pt step 2000: 400 held-out template problems
|
| 3 |
+
13:33:00 EX tp_probability | Q: Question: Quinn Johnson is preparing a quiz bowl with 10 distinct questions. They have prepared a bank of 12 potential questions. If they select 10 questions at | GOLD: 5/6 | OUT: 10) / C(12, 10) = 12 / Probability = 12 / 10 / Simplify by dividing numerator and denominator by 10 / 12 / 10 = 12 / 10 / 10 = 1 / GCD of 12 and 10 / (12, 10) = 1 / (12, 10) = 1 / GCD of 1 and 12 / 1 / 12 = 1 / 1 / 12 = 1 / GCD of 12 and 10 / 12 / 10 = 1 / 12 / 10 = 1 / GCD of 12 and 10 / 12 / 10 = 1 / 1 / 10 / 1 / 10 / 1 / 10 / 1 / 10 / 1/
|
| 4 |
+
13:33:00 EX tp_science_calc | Q: Question: A large industrial tank contains a mixture of ideal gases. The temperature of the gas mixture is 349 K. What is the root-mean-square speed of the Argo | GOLD: 466 m/s | OUT: = 349 K / T = 349 K / M_Ar = 40.0 g/mol / R = 8.314 J/(mol*K) / T = 349 K / T = 349 K / T_T = 349 K / T = sqrt(T_T) / T = sqrt(349) / T = sqrt(349) / T = sqrt(349) / T = sqrt(349) / T = sqrt(349) / T = sqrt(349) / T = sqrt(349) / T = sqrt(349) / T_T = sqrt(349) / T = sqrt(349) / T = sqrt(349) / T = sqrt(349) / T = 0.000000 m/s / #### 0.0000
|
| 5 |
+
13:33:00 EX tp_wordproblem | Q: Question: A network storage device is advertised to hold 9 Terabytes of data. If a specific file format uses 0.6 Gigabytes per file, and the device is currently | GOLD: 5100 | OUT: .6 = 0.6 MB / Required file size: 0.6 MB / Required remaining size: 0.6 / 0.6 = 0.6 / Remaining capacity: 0.6 - 0.6 = 0.6 / Required file size: 0.6 MB / Required remaining size: 0.6 / 0.6 = 0.6 / Remaining capacity: 0.6 - 0.6 = 0.6 / Required file size: 0.6 MB / Maximum remaining size: 0.6 / 0.6 = 0.6 / Maximum files
|
| 6 |
+
13:33:00 EX tp_finance | Q: Question: Calculate the break-even point in units for the Riverside Workshop, which has fixed costs of $185,000, a variable cost of $67 per units, and a selling | GOLD: 1000 | OUT: al fixed costs = $185,000 / Contribution margin per unit = $252 / Final fixed costs = $185,000 / Contribution margin per unit = $252 / Break-even units = $185000 / $252 / Break-even units = 5.0000 / Break-even units = 5.0000 / Break-even units = 5.0000 / 5.0000 / Break-even units = 5.0000 / Break-even units = 5.0000 /
|
| 7 |
+
13:33:00 TASK tp_deduction correct 0/2 reached_#### 1
|
| 8 |
+
13:33:00 TASK tp_finance correct 1/86 reached_#### 28
|
| 9 |
+
13:33:00 TASK tp_logic correct 1/40 reached_#### 15
|
| 10 |
+
13:33:00 TASK tp_planning correct 1/33 reached_#### 10
|
| 11 |
+
13:33:00 TASK tp_probability correct 0/57 reached_#### 19
|
| 12 |
+
13:33:00 TASK tp_science_calc correct 0/59 reached_#### 11
|
| 13 |
+
13:33:00 TASK tp_wordproblem correct 0/123 reached_#### 46
|
| 14 |
+
13:33:00 TMETER sft/tpA9_latest.pt step 2000: correct 3/400 (0.8%), reached #### 130/400
|
| 15 |
+
13:33:00 METER DONE
|