File size: 24,503 Bytes
23a6c53
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
e1841c2
23a6c53
 
 
 
 
 
e1841c2
23a6c53
e1841c2
 
 
 
 
 
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
e1841c2
23a6c53
 
e1841c2
3b8d5e8
 
 
23a6c53
 
e235af3
 
 
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
e1841c2
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2ed77ee
 
 
e1841c2
 
 
 
 
 
 
 
 
 
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
e1841c2
23a6c53
 
 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
[
 {
  "id": "google-suncatcher-tpu-prototype",
  "company": "Google",
  "partners": [
   "Planet"
  ],
  "project": "Project Suncatcher: first TPU prototype satellite",
  "category": "prototype satellite",
  "hardware": "4 Google Trillium-generation TPUs",
  "launch_date": "2026-10-01",
  "launch_date_text": "1 Oct 2026, 18:32 UTC (Transporter-18)",
  "launch_vehicle": "SpaceX Falcon 9",
  "launch_mission": "Transporter-18 rideshare, Vandenberg SLC-4E",
  "ll2_launch_id": "67213393-7983-4c06-8b44-b8c785a5ed79",
  "status": "in orbit",
  "scale": "1 satellite",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [
   "SUNCATCHER"
  ],
  "summary": "Google's first TPUs in orbit, on a prototype satellite developed with Planet. Launched 1 Oct 2026; Google says it has confirmed contact and the satellite is operating as expected. It will gather data on how the chips handle launch stress, radiation and thermal extremes in low Earth orbit.",
  "sources": [
   {
    "publisher": "Google (blog.google)",
    "date": "2026-10-01",
    "url": "https://blog.google/innovation-and-ai/models-and-research/google-research/project-suncatcher-prototype/",
    "fact": "Prototype satellite built with Planet launched on Transporter-18 on 1 Oct 2026; team confirmed contact and it is operating as expected"
   },
   {
    "publisher": "Google (blog.google)",
    "date": "2026-09-24",
    "url": "https://blog.google/innovation-and-ai/models-and-research/google-research/google-project-suncatcher-facts/",
    "fact": "First TPUs go to orbit on SpaceX's Transporter-18 rideshare, developed in partnership with Planet"
   },
   {
    "publisher": "Gizmodo",
    "date": "2026-09-24",
    "url": "https://gizmodo.com/googles-project-suncatcher-is-sending-ai-chips-into-space-next-week-2000816985",
    "fact": "Four Google TPUs (Trillium) launch next week on Transporter-18"
   },
   {
    "publisher": "The Space Devs Launch Library 2",
    "date": "2026-10-03",
    "url": "https://ll.thespacedevs.com/2.3.0/launches/67213393-7983-4c06-8b44-b8c785a5ed79/",
    "fact": "Transporter 18: launched 2026-10-01T18:32:00Z, status Launch Successful, SLC-4E"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": [
   100902
  ],
  "launch": {
   "name": "Falcon 9 Block 5 | Transporter 18 (Dedicated SSO Rideshare)",
   "net": "2026-10-01T18:32:00Z",
   "status": "Success",
   "status_name": "Launch Successful",
   "window_start": "2026-10-01T18:18:00Z",
   "window_end": "2026-10-01T19:16:00Z",
   "source_url": "https://ll.thespacedevs.com/2.3.0/launches/67213393-7983-4c06-8b44-b8c785a5ed79/"
  }
 },
 {
  "id": "google-planet-suncatcher-pair",
  "company": "Google",
  "partners": [
   "Planet"
  ],
  "project": "Project Suncatcher: two prototype satellites with cross-links",
  "category": "prototype satellites",
  "hardware": "Google TPUs (per satellite count not stated)",
  "launch_date": null,
  "launch_date_text": "early 2027 (target)",
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "planned",
  "scale": "2 satellites flying in tandem with high-bandwidth cross-links",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "Planet builds and operates two prototype satellites for Google to test TPUs working together over high-bandwidth inter-satellite links.",
  "sources": [
   {
    "publisher": "Planet (planet.com)",
    "date": "2025-11-04",
    "url": "https://www.planet.com/pulse/planet-to-build-and-operate-advanced-space-platform-for-project-suncatcher-moonshot/",
    "fact": "Planet will deploy two prototype satellites for Google, targeting a launch by early 2027"
   },
   {
    "publisher": "Google (blog.google)",
    "date": "2026-09-24",
    "url": "https://blog.google/innovation-and-ai/models-and-research/google-research/google-project-suncatcher-facts/",
    "fact": "We'll test our work on this in 2027 when we put two satellites in orbit"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "starcloud-1",
  "company": "Starcloud",
  "partners": [
   "NVIDIA"
  ],
  "project": "Starcloud-1",
  "category": "in-orbit satellite",
  "hardware": "1 NVIDIA H100 GPU",
  "launch_date": "2025-11-02",
  "launch_date_text": "2 Nov 2025",
  "launch_vehicle": "SpaceX Falcon 9",
  "launch_mission": "Bandwagon-4 rideshare",
  "ll2_launch_id": null,
  "status": "in orbit",
  "scale": "1 satellite",
  "funding_public": "$170M Series A at a $1.1B valuation (Mar 2026), led by Benchmark with EQT Ventures",
  "norad_ids": [
   66303
  ],
  "celestrak_names": [
   "STARCLOUD"
  ],
  "summary": "First NVIDIA H100 in orbit; Starcloud reports it trained a small language model and ran a version of Gemini in space (Dec 2025).",
  "sources": [
   {
    "publisher": "Starcloud (starcloud.com)",
    "date": "2026-09-30",
    "url": "https://www.starcloud.com/starcloud-1",
    "fact": "Launched November 2025 with an NVIDIA H100; first spacecraft to train a language model; NORAD 66303"
   },
   {
    "publisher": "CelesTrak SATCAT",
    "date": "2026-09-30",
    "url": "https://celestrak.org/satcat/records.php?INTDES=2025-248",
    "fact": "STARCLOUD-1, 2025-248L, NORAD 66303, launched 2025-11-02"
   },
   {
    "publisher": "Via Satellite",
    "date": "2026-03-30",
    "url": "https://www.satellitetoday.com/finance/2026/03/30/starcloud-raises-170m-to-fund-orbital-data-center-plans/",
    "fact": "$170M Series A at $1.1B valuation, Benchmark led with EQT Ventures"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "starcloud-2",
  "company": "Starcloud",
  "partners": [],
  "project": "Starcloud-2",
  "category": "satellite",
  "hardware": null,
  "launch_date": null,
  "launch_date_text": "later in 2026 (company, Mar 2026)",
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "planned",
  "scale": "1 satellite; FCC filing for up to 88,000 satellites",
  "funding_public": "$170M Series A at a $1.1B valuation (Mar 2026)",
  "norad_ids": [],
  "celestrak_names": [
   "STARCLOUD-2"
  ],
  "summary": "Second Starcloud satellite, to run commercial edge and cloud workloads; the company is seeking FCC approval for a system of up to 88,000 satellites.",
  "sources": [
   {
    "publisher": "Via Satellite",
    "date": "2026-03-30",
    "url": "https://www.satellitetoday.com/finance/2026/03/30/starcloud-raises-170m-to-fund-orbital-data-center-plans/",
    "fact": "Preparing to launch Starcloud-2 later this year to run commercial edge and cloud workloads; up to 88,000 satellites sought"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "crusoe-cloud-on-starcloud",
  "company": "Crusoe",
  "partners": [
   "Starcloud"
  ],
  "project": "Crusoe Cloud on a Starcloud satellite",
  "category": "hosted cloud module",
  "hardware": null,
  "launch_date": null,
  "launch_date_text": "late 2026 (planned); GPU capacity from orbit by early 2027",
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "planned",
  "scale": "1 hosted module",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "Crusoe plans the first public cloud operating from orbit, on a Starcloud satellite.",
  "sources": [
   {
    "publisher": "Telco Magazine",
    "date": "2025-10-27",
    "url": "https://telcomagazine.com/news/crusoe-and-starcloud-launch-a-cloud-in-orbit",
    "fact": "Crusoe Cloud will operate on a Starcloud satellite scheduled for launch in late 2026, with GPU capacity available from orbit by early 2027"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "spacex-orbital-data-center-constellation",
  "company": "SpaceX (with xAI)",
  "partners": [
   "xAI"
  ],
  "project": "Orbital data center constellation (FCC SAT-LOA-20260108-00016)",
  "category": "constellation filing",
  "hardware": null,
  "launch_date": null,
  "launch_date_text": "FCC application filed 30 Jan 2026",
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "filed",
  "scale": "up to 1,000,000 satellites, 500-2,000 km",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "SpaceX asked the FCC for up to one million satellites operating as orbital data centers; announced alongside SpaceX's acquisition of xAI.",
  "sources": [
   {
    "publisher": "The Register",
    "date": "2026-02-05",
    "url": "https://www.theregister.com/2026/02/05/spacex_1m_satellite_datacenter/",
    "fact": "Application filed 30 Jan 2026 (SAT-LOA-20260108-00016) for up to one million satellites at 500-2,000 km"
   },
   {
    "publisher": "FCC",
    "date": "2026-02",
    "url": "https://docs.fcc.gov/public/attachments/DA-26-113A1.pdf",
    "fact": "FCC public notice accepting the application for filing"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "spacex-starmind-ai1",
  "company": "SpaceX (with xAI)",
  "partners": [
   "NVIDIA"
  ],
  "project": "Starmind AI1: first-generation AI compute satellite",
  "category": "satellite",
  "hardware": "Space-optimized NVIDIA Vera Rubin NVL72 system (NVIDIA Rubin GPUs and Vera CPUs)",
  "launch_date": null,
  "launch_date_text": "Q4 2027 (Musk, 24 Aug 2026); 'significant scale' in 2028",
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "announced",
  "scale": "per AI1 satellite: 150 kW peak / about 120 kW average compute, 70 m wingspan, 20 m deployed height",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [
   "STARMIND"
  ],
  "summary": "SpaceX's first-generation orbital data center satellite. SpaceX said on 4 Aug 2026 it is partnering with NVIDIA on the AI1 compute payload; NVIDIA's 24 Aug 2026 release says AI1 will be based on an optimized Vera Rubin NVL72 rack-scale system. Musk gave Q4 2027 for the first launch to orbit. The wider constellation is the FCC filing tracked separately.",
  "sources": [
   {
    "publisher": "NVIDIA Newsroom",
    "date": "2026-08-24",
    "url": "https://nvidianews.nvidia.com/news/spacexai-adopts-nvidia-vera-cpu-to-accelerate-agentic-ai-at-massive-scale",
    "fact": "SpaceXAI's planned first-generation Starmind AI satellite will be based on the optimized NVIDIA Vera Rubin NVL72 rack-scale system"
   },
   {
    "publisher": "Light Reading",
    "date": "2026-08-25",
    "url": "https://www.lightreading.com/satellite/with-nvidia-on-board-spacex-orbital-data-centers-to-hit-significant-scale-in-2028",
    "fact": "Musk: space-optimized Vera Rubin NVL72 system for launch to orbit in Q4 2027, significant scale in 2028; AI1 is 20 m high, 70 m wingspan, 150 kW peak, about 120 kW average compute"
   },
   {
    "publisher": "Yahoo Finance",
    "date": "2026-08-05",
    "url": "https://finance.yahoo.com/technology/article/elon-musk-says-spacex-will-build-exclusively-with-nvidia-touts-space-based-ai-servers-211803293.html",
    "fact": "On the 4 Aug 2026 Q2 earnings call Musk said SpaceX is exclusive to NVIDIA; Starmind satellites to use Vera Rubin NVL72 rack-scale systems"
   },
   {
    "publisher": "Interesting Engineering",
    "date": "2026-08-04",
    "url": "https://interestingengineering.com/ai-robotics/spacex-nvidia-starmind-ai1-compute-payload",
    "fact": "SpaceX is partnering with NVIDIA to design the Starmind AI1 satellite compute payload, with NVIDIA Rubin GPUs and Vera CPUs"
   },
   {
    "publisher": "Yahoo Finance",
    "date": "2026-06-09",
    "url": "https://finance.yahoo.com/sectors/technology/article/spacex-reveals-its-first-orbital-data-center-much-simpler-than-a-starlink-satellite-musk-says-141110185.html",
    "fact": "AI1 revealed June 2026: 150 kW peak / 120 kW average compute, 70 m wingspan, 20 m deployed height, deployable liquid radiator"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "blue-origin-project-sunrise",
  "company": "Blue Origin",
  "partners": [],
  "project": "Project Sunrise",
  "category": "constellation filing",
  "hardware": null,
  "launch_date": null,
  "launch_date_text": "FCC application filed March 2026",
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "filed",
  "scale": "up to 51,600 satellites in sun-synchronous orbits",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "Blue Origin filed with the FCC for a constellation of up to 51,600 satellites delivering compute capacity for AI.",
  "sources": [
   {
    "publisher": "Engadget",
    "date": "2026-03-20",
    "url": "https://www.engadget.com/science/space/blue-origin-also-wants-to-put-ai-data-centers-in-space-115614142.html",
    "fact": "Project Sunrise: up to 51,600 satellites in sun-synchronous orbit, FCC filing"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "orbital-inc-100k-filing",
  "company": "Orbital",
  "partners": [],
  "project": "Orbital data center constellation (FCC request)",
  "category": "constellation filing",
  "hardware": null,
  "launch_date": null,
  "launch_date_text": "FCC request reported 30 Jun 2026; first launch not stated",
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "filed",
  "scale": "up to 100,000 satellites; 10 GW compute target",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "Tampa, Florida startup (about five months old at filing) asking the FCC to deploy up to 100,000 data center satellites for 10 GW of computing power.",
  "sources": [
   {
    "publisher": "SpaceNews",
    "date": "2026-06-30",
    "url": "https://spacenews.com/orbital-files-plans-for-100000-orbital-data-centers/",
    "fact": "Orbital asked the FCC for up to 100,000 data center satellites, targeting 10 GW of computing power"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "axiom-odc-nodes-kepler",
  "company": "Axiom Space",
  "partners": [
   "Kepler Communications"
  ],
  "project": "Orbital data center nodes (first two)",
  "category": "hosted compute nodes",
  "hardware": "commercial off-the-shelf compute with 2.5 Gbps optical links",
  "launch_date": "2026-01-11",
  "launch_date_text": "11 Jan 2026",
  "launch_vehicle": "SpaceX Falcon 9",
  "launch_mission": "with the first tranche of Kepler's optical relay network",
  "ll2_launch_id": null,
  "status": "in orbit",
  "scale": "2 nodes",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "Axiom's first two orbital data center nodes, launched with Kepler Communications' optical relay satellites. Which host satellites carry them is not public, so no NORAD IDs are listed.",
  "sources": [
   {
    "publisher": "Axiom Space (axiomspace.com)",
    "date": "2026-09-30",
    "url": "https://www.axiomspace.com/orbital-data-center",
    "fact": "First two ODC nodes launched to LEO on January 11, 2026 with the first tranche of Kepler's optical relay network"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "axiom-axdcu-1-iss",
  "company": "Axiom Space",
  "partners": [
   "Red Hat"
  ],
  "project": "Data Center Unit-1 (AxDCU-1) on the ISS",
  "category": "space station payload",
  "hardware": "Red Hat Device Edge compute unit",
  "launch_date": null,
  "launch_date_text": "fall 2025 (deployed to the ISS)",
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "deployed",
  "scale": "1 unit",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "Axiom's data center prototype aboard the International Space Station.",
  "sources": [
   {
    "publisher": "Axiom Space (axiomspace.com)",
    "date": "2026-09-30",
    "url": "https://www.axiomspace.com/orbital-data-center",
    "fact": "AxDCU-1, powered by Red Hat Device Edge, deployed to the ISS in fall 2025"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "ada-space-three-body-constellation",
  "company": "ADA Space and Zhejiang Lab",
  "partners": [],
  "project": "Three-Body Computing Constellation (first 12 satellites)",
  "category": "in-orbit constellation",
  "hardware": "on-board AI processors (per-satellite specs not in source)",
  "launch_date": "2025-05-14",
  "launch_date_text": "14 May 2025",
  "launch_vehicle": "Long March 2D",
  "launch_mission": "Jiuquan",
  "ll2_launch_id": null,
  "status": "in orbit",
  "scale": "12 satellites launched; 2,800 planned",
  "funding_public": null,
  "norad_ids": [
   63982,
   63983,
   63984,
   63985,
   63986,
   63987,
   63988,
   63989,
   63990,
   63991,
   63992,
   63993
  ],
  "norad_note": "CelesTrak lists 12 payloads SCS-01 A-M (2025-100A-M, owner PRC) launched from Jiuquan on 14 May 2025; matched to this launch by date, site and count.",
  "celestrak_names": [],
  "summary": "China's first batch of computing satellites for a planned 2,800-satellite on-orbit computing constellation.",
  "sources": [
   {
    "publisher": "SpaceNews",
    "date": "2025-05-14",
    "url": "https://spacenews.com/china-launches-first-of-2800-satellites-for-ai-space-computing-constellation/",
    "fact": "12 satellites on a Long March 2D, led by ADA Space and Zhejiang Lab; 2,800-satellite constellation planned"
   },
   {
    "publisher": "CelesTrak SATCAT",
    "date": "2026-09-30",
    "url": "https://celestrak.org/satcat/records.php?INTDES=2025-100",
    "fact": "SCS-01 A-M, NORAD 63982-63993, launched 2025-05-14 from Jiuquan"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "takeme2space-moi-1a",
  "company": "TakeMe2Space",
  "partners": [],
  "project": "MOI-1a in-orbit compute satellite",
  "category": "in-orbit satellite",
  "hardware": "117 TOPS onboard compute, 2 TB storage, nine-band multispectral imager",
  "launch_date": "2026-10-01",
  "launch_date_text": "1 Oct 2026, 18:32 UTC (Transporter-18)",
  "launch_vehicle": "SpaceX Falcon 9",
  "launch_mission": "Transporter-18 rideshare, Vandenberg SLC-4E",
  "ll2_launch_id": "67213393-7983-4c06-8b44-b8c785a5ed79",
  "status": "in orbit",
  "scale": "1 satellite (14 kg); constellation of five planned",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [
   "MOI-1A"
  ],
  "summary": "Hyderabad-based TakeMe2Space's Earth-observation satellite that processes data in orbit; the company calls it a first step toward an orbital data centre. Follows the loss of MOI-1 on PSLV-C62 (12 Jan 2026).",
  "sources": [
   {
    "publisher": "ThePrint",
    "date": "2026-10-02",
    "url": "https://theprint.in/feature/takeme2space-launches-ai-powered-satellite-on-spacex-eyes-orbital-data-centre/3059872",
    "fact": "MOI-1a (14 kg, 117 TOPS, 2 TB) launched on SpaceX Transporter-18 from Vandenberg; step toward a five-satellite orbital data centre"
   },
   {
    "publisher": "The Space Devs Launch Library 2",
    "date": "2026-10-03",
    "url": "https://ll.thespacedevs.com/2.3.0/launches/67213393-7983-4c06-8b44-b8c785a5ed79/",
    "fact": "Transporter 18: launched 2026-10-01T18:32:00Z, status Launch Successful"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": [
   101107
  ],
  "launch": {
   "name": "Falcon 9 Block 5 | Transporter 18 (Dedicated SSO Rideshare)",
   "net": "2026-10-01T18:32:00Z",
   "status": "Success",
   "status_name": "Launch Successful",
   "window_start": "2026-10-01T18:18:00Z",
   "window_end": "2026-10-01T19:16:00Z",
   "source_url": "https://ll.thespacedevs.com/2.3.0/launches/67213393-7983-4c06-8b44-b8c785a5ed79/"
  }
 },
 {
  "id": "aetherflux-galactic-brain",
  "company": "Aetherflux",
  "partners": [],
  "project": "Galactic Brain",
  "category": "satellite",
  "hardware": "solar-powered AI compute satellite (GPU details not stated)",
  "launch_date": null,
  "launch_date_text": "Q1 2027 (target)",
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "announced",
  "scale": "first orbital data center satellite",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "Space-based solar power startup's first orbital data center satellite, announced 9 Dec 2025.",
  "sources": [
   {
    "publisher": "Aetherflux press release (Yahoo Finance)",
    "date": "2025-12-09",
    "url": "https://finance.yahoo.com/news/aetherflux-announces-orbital-data-center-120000861.html",
    "fact": "Galactic Brain orbital data center, targeting Q1 2027"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "lonestar-freedom-lunar",
  "company": "Lonestar Data Holdings",
  "partners": [
   "Intuitive Machines",
   "Phison"
  ],
  "project": "Freedom lunar data center payload (IM-2)",
  "category": "lunar payload",
  "hardware": "small data center payload with Phison storage",
  "launch_date": "2025-02-27",
  "launch_date_text": "27 Feb 2025 00:16 UTC (IM-2)",
  "launch_vehicle": "SpaceX Falcon 9",
  "launch_mission": "Intuitive Machines IM-2 (Athena lander)",
  "ll2_launch_id": "fd0fbaac-d079-4027-98b0-bcf25c15a166",
  "status": "flown",
  "scale": "1 payload",
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "Billed as the first data center flown to the Moon, for disaster-recovery backup and edge processing.",
  "sources": [
   {
    "publisher": "Lonestar / Intuitive Machines (PR Newswire)",
    "date": "2025-02-10",
    "url": "https://www.prnewswire.com/news-releases/lonestars-data-center-is-ready-for-the-moon-intuitive-machines-and-lonestar-complete-final-installation-and-testing-of-lonestars-data-center-payload-302372021.html",
    "fact": "Freedom payload installed on IM-2, launch window no earlier than 26 Feb 2025"
   },
   {
    "publisher": "The Space Devs Launch Library 2",
    "date": "2026-09-30",
    "url": "https://ll.thespacedevs.com/2.3.0/launches/fd0fbaac-d079-4027-98b0-bcf25c15a166/",
    "fact": "Falcon 9 | Nova-C IM-2 launched 2025-02-27T00:16:30Z"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": [],
  "launch": {
   "name": "Falcon 9 Block 5 | Nova-C IM-2 & Others",
   "net": "2025-02-27T00:16:30Z",
   "status": "Success",
   "status_name": "Launch Successful",
   "window_start": "2025-02-27T00:16:30Z",
   "window_end": "2025-02-27T00:16:30Z",
   "source_url": "https://ll.thespacedevs.com/2.3.0/launches/fd0fbaac-d079-4027-98b0-bcf25c15a166/"
  }
 },
 {
  "id": "sophia-space-tile",
  "company": "Sophia Space",
  "partners": [],
  "project": "TILE orbital computing modules",
  "category": "hardware in development",
  "hardware": "tile-shaped satellite compute modules with integrated solar power and radiative cooling",
  "launch_date": null,
  "launch_date_text": null,
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "development",
  "scale": null,
  "funding_public": "$10M seed (Feb 2026)",
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "Startup building space-based edge computers and orbital data center modules.",
  "sources": [
   {
    "publisher": "SpaceNews",
    "date": "2026-02-24",
    "url": "https://spacenews.com/sophia-space-claims-10-million-in-seed-round/",
    "fact": "$10 million seed to develop space-based edge computers and orbital data centers"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 },
 {
  "id": "nvidia-vera-rubin-space-1",
  "company": "NVIDIA",
  "partners": [
   "Planet",
   "Aetherflux",
   "Sophia Space"
  ],
  "project": "Vera Rubin Space-1 Module",
  "category": "hardware platform",
  "hardware": "Vera Rubin Space-1 Module for orbital data centers",
  "launch_date": null,
  "launch_date_text": "announced 16 Mar 2026 (GTC); availability not stated",
  "launch_vehicle": null,
  "launch_mission": null,
  "ll2_launch_id": null,
  "status": "announced",
  "scale": null,
  "funding_public": null,
  "norad_ids": [],
  "celestrak_names": [],
  "summary": "NVIDIA's compute module for satellites and orbital data centers; its CEO said cooling in space is still being worked out.",
  "sources": [
   {
    "publisher": "SiliconANGLE",
    "date": "2026-03-16",
    "url": "https://siliconangle.com/2026/03/16/nvidia-previews-vera-rubin-space-1-module-orbital-data-centers/",
    "fact": "Vera Rubin Space-1 Module previewed at GTC for orbital data centers; partners include Sophia Space, Aetherflux and Planet"
   }
  ],
  "verified_on": "2026-10-03",
  "auto_norad_ids": []
 }
]