hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 51.5.3.1.1.1 Conformance requirements | The mobile station may request establishment of one or more uplink TBFs when there are one or more ongoing downlink TBFs by including a Channel Request Description or the Extended Channel Request Description information element in the (EGPRS) PACKET DOWNLINK ACK/NACK message. Initiation is triggered by a request from ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 51.5.3.1.1.2 Test purpose | To verify that the MS can be assigned uplink PS resources, when no reallocation of the existing CS and downlink PS resources is required. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 51.5.3.1.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported.
Mobile Station:
The MS is in the state "idle, updated, GMM-registered, GPRS attached" with a TMSI, P-TMSI allocated and PDP context 1 has been established. The MS is also in the active state (U10) of a call on the cell.
Specific PICS Statements
-
PIXIT Stateme... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 51.5.3.2 Downlink TBF establishment with a uplink established | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 51.5.3.2.1 Downlink TBF establishment with a uplink TBF established and no PS uplink reallocation | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 51.5.3.2.1.1 Conformance requirements | During uplink transfer, the network may initiate a downlink TBF by sending a PACKET DOWNLINK ASSIGNMENT message, or a PACKET TIMESLOT RECONFIGURE, to the mobile station on the PACCH. If a PACKET TIMESLOT RECONFIGURE message is sent, then the message shall contain the DOWNLINK_TFI_ASSIGNMENT field. The multislot restric... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 51.5.3.2.1.2 Test purpose | To verify that a downlink TBF can be established without reallocation of uplink PS resources, whilst maintaining DTM. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 51.5.3.2.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported
Mobile Station:
The MS is in the active state (U10) of a call.
The MS is GPRS idle with a P-TMSI allocated and the PDP context 1 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS, whilst in dedicated mode, is triggered to initiate p... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 51.6 Dynamic ARFCN mapping tests | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 51.6.1 Void | 52 EGPRS Test of Medium Access Control (MAC) protocol |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1 Test of Medium Access Control (MAC) Procedures | Default conditions
The SS default conditions simulate one cell with default settings as defined in the EGPRS general default section.
The MS default initial condition is GPRS attached. Unless otherwise stated, no PDP context is required.
The default message contents and signalling macro not specified in the end of this... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.1 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2 Packet Uplink/Downlink Assignment | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1 Packet uplink assignment procedure | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.1 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.2 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.3 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.4 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.5 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.6 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.7 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.8 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9 Packet Uplink Assignment / Two phase access | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.1 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2 Packet Uplink Assignment / Two phase access / Contention resolution | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.1 Packet Uplink Assignment / Two phase access / Contention resolution / Expiry of timer T3168 | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.1.1 Conformance requirements | The contention resolution has failed on the mobile station side when the mobile station does not receive a PACKET UPLINK ASSIGNMENT message with its TLLI before expiry of timer T3168. The mobile station shall then reinitiate the packet access procedure unless it has already been repeated 4 times. In that case, TBF fail... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.1.2 Test purpose | To verify that the mobile station reinitiates the packet access procedure after a time equal to timer T3168 and the procedure shall be repeated 4 times. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.1.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS, CCCH combined with SDCCH, SI13 GPRS Cell Options, T3168 = 7.
Mobile Station:
The MS is GPRS attached and in packet idle mode. PDP context 1 has been established.
Specific PICS Statements
- Release of EGPRS Supported (TSPC_MS_EGPRS_RELEASE)
PIXIT Statements
-... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.2 Packet Uplink Assignment / Two phase access / Contention resolution / TLLI in Packet Resource Request message | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.2.1 Conformance requirements | The mobile station shall provide the network with its radio access capabilities for the frequency bands it supports, in the same priority order as the one specified by the network, by sending a PACKET RESOURCE REQUEST message, and an ADDITIONAL MS RADIO ACCESS CAPABILITIES if all the requested information do not fit in... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.2.2 Test purpose | To verify that the MS includes TLLI in both PACKET RESOURCE REQUEST message, and ADDITIONAL MS RADIO ACCESS CAPABILITIES, if it is present.
To verify that the mobile responds correctly for a request for retransmission of one or both of these messages indicated in the PACKET UPLINK ASSIGNMENT message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.2.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS, CCCH combined with SDCCH.
Mobile Station:
The MS is GPRS attached and in packet idle mode. PDP context 1 has been established.
Specific PICS Statements
-
PIXIT Statements
-
Test procedure
The MS is triggered to initiate unacknowledged uplink data transfer. T... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.3 Packet Uplink Assignment / Two phase access / Contention resolution / TLLI mismatch | The contention resolution is completed on the mobile station side when the mobile station receives a PACKET UPLINK ASSIGNMENT message with the same TLLI as the mobile station has included in the PACKET RESOURCE REQUEST message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.3.1 Conformance requirements | If the failure is due to a TLLI mismatch, or to the expiry of timers T3166 or T3168, or to the fact that the counter N3104 reaches its maximum value in the contention resolution procedure, and repetition as described in subclauses 7.1.2.3, 7.1.3.2.1 or 7.1.3.3 has been performed, the mobile station shall remain in pack... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.3.2 Test purpose | To verify that the MS reinitiates packet access procedure with failure due to a TLLI mismatch in the contention resolution procedure, unless it has already been repeated 4 times. In that case, TBF failure has occurred. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.2.3.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS, CCCH combined with SDCCH.
Mobile Station:
The MS is GPRS attached and in packet idle mode. PDP context 1 has been established.
Specific PICS Statements
- Release of EGPRS Supported (TSPC_MS_EGPRS_RELEASE)
PIXIT Statements
-
Test procedure
The MS is triggered... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.3 Packet Uplink Assignment / Two phase access / Radio Access Capabilities | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.3.1 Conformance requirements | When assigning an EGPRS TBF, the network may request information about radio access capabilities of the mobile station on one or several frequency bands within the PACKET UPLINK ASSIGNMENT message ; the list of frequency bands is ordered by the network starting with the most important and ending with the least importan... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.3.2 Test purpose | To verify that the mobile station provides the network with the radio access capabilities of the frequency bands it supports.
To verify that the mobile station provides the radio access capabilities in the same priority order as the one specified by network (in case of Rel-5 and earlier and if the alternative coding by... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.3.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS, CCCH combined with SDCCH.
Mobile Station:
The MS is GPRS attached and in packet idle mode. PDP context 1 has been established.
Specific PICS Statements
- Support of Standard GSM Band (P-GSM) (TSPC_Type_GSM_P_Band)
- Support of Extended GSM Band (E-GSM), (inc... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.4 Packet Uplink Assignment / Two phase access / Radio Access Capabilities/ Frequency band not supported | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.4.1 Conformance requirements | When assigning an EGPRS TBF, the network may request information about radio access capabilities of the mobile station on one or several frequency bands within the PACKET UPLINK ASSIGNMENT message ; the list of frequency bands is ordered by the network starting with the most important and ending with the least importan... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.4.2 Test purpose | To verify that if the mobile station does not support any of the frequency band requested by the network, it shall report its radio access capability for the BCCH frequency band. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.4.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS, CCCH combined with SDCCH.
Mobile Station:
The MS is GPRS attached and in packet idle mode. PDP context 1 has been established.
Specific PICS Statements
-
PIXIT Statements
-
Test procedure
The MS is triggered to initiate unacknowledged uplink data transfer. T... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.5 Packet Uplink Assignment / Two phase access / Packet Resource Request / No respond to Packet Downlink Assignment | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.5.1 Conformance requirements | At sending of the PACKET RESOURCE REQUEST message, the mobile station shall start timer T3168. Further more, the mobile station shall not respond to PACKET DOWNLINK ASSIGNMENT messages while timer T3168 is running.
Reference
3GPP TS 04.60 subclause 7.1.3.1. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.5.2 Test purpose | To verify that the mobile station does not respond to PACKET DOWNLINK ASSIGNMENT messages while timer T3168 is running after sending of the PACKET RESOURCE REQUEST message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.9.5.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS , CCCH combined with SDCCH.
T3168 indicates value 7 in GPRS Cell Options.
Mobile Station:
The MS is GPRS attached and in packet idle mode. PDP context 2 has been established.
Specific PICS Statements
-
PIXIT Statements
-
Test procedure
The MS is triggered to ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.10 Packet Uplink Assignment / Abnormal cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.10.1 Packet Uplink Assignment / Abnormal cases / Incorrect PDCH assignment | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.10.1.1 Conformance requirements | If the mobile station has been assigned more PDCHs than it supports according to its MS multislot class, the mobile station shall reinitiate the packet access procedure unless it has already been repeated 4 times. In that case, TBF failure has occurred.
Reference
3GPP TS 04.60 subclause 7.1.4. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.10.1.2 Test purpose | To verify that the mobile station reinitiates the packet access procedure when the mobile station has been assigned more PDCHs than it supports and after 4 repetitions of the packet access procedure the mobile station shall initiate TBF failure. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.10.1.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS , CCCH combined with SDCCH.
Mobile Station:
The MS is GPRS attached and in packet idle mode. PDP context 2 has been established.
Specific PICS Statements
- Release of EGPRS Supported (TSPC_MS_EGPRS_RELEASE)
- EGPRS Multislotclass (TSPC_Type_EGPRS_Multislot_Cl... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.10.2 Packet Uplink Assignment / Abnormal cases / Expiry of timer T3164 | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.10.2.1 Conformance requirements | On expiry of timer T3164, the mobile station shall reinitiate the packet access procedure unless it has already been reinitiated 3 times, in which case the mobile station shall return to packet idle mode and notify higher layers.
Reference
3GPP TS 04.60 subclause 7.1.4. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.10.2.2 Test purpose | To verify that the mobile station reinitiate the packet access procedure when the network have sent a PACKET UPLINK ASSIGNMENT message but the MS has not sent the first block within the time equal to the timer T3164. This packet access procedure shall at most be reinitiated 3 times. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.1.10.2.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS, CCCH combined with SDCCH.
GPRS cell options, ACCESS_BURST_TYPE indicates 8 bit access.
Mobile Station:
The MS is GPRS attached and in packet idle mode. PDP context 2 has been established.
Specific PICS Statements
-
PIXIT Statements
-
Test procedure
The MS is... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2 Packet Downlink Assignment | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.1 Packet Downlink Assignment / Response to poll bit | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.1.1 Conformance requirements | In case valid timing advance for the mobile station is not available, the network may use one of the following two methods to trigger the mobile station to transmit a PACKET CONTROL ACKNOWLEDGEMENT:
- if the PACKET DOWNLINK ASSIGNMENT message is not segmented and the CONTROL_ACK_TYPE parameter in the System Information... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.1.2 Test purpose | To verify that the mobile station sends PACKET CONTROL ACKNOWLEDGEMENT as four access bursts if the network sets the poll bit in the PACKET DOWNLINK ASSIGNMENT message when CONTROL_ACK_TYPE is set to four access bursts. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.1.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS, CCCH combined with SDCCH. CONTROL_ACK_TYPE is set to indicate PACKET CONTROL ACKNOWLEGEMENT format as four access bursts and the ACCESS_BURST_TYPE indicates 11 bit access.
Mobile Station:
The MS is GPRS attached and in packet idle mode and Ready state.
Speci... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.2 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.3 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.4 Packet Downlink Assignment / Response to Packet Polling | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.4.1 Conformance requirements | In case valid timing advance for the mobile station is not available, the network may use one of the following two methods to trigger the mobile station to transmit a PACKET CONTROL ACKNOWLEDGEMENT:
- if the PACKET DOWNLINK ASSIGNMENT message is not segmented and the CONTROL_ACK_TYPE parameter in the System Information... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.4.2 Test purpose | To verify that on receipt of a PACKET POLLING REQUEST message, the mobile station responds with PACKET CONTROL ACKNOWLEDGEMENT message in the block period specified by the RRBP field. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.4.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS, CCCH combined with SDCCH. CONTROL_ACK_TYPE is set to not indicate acknowledgement as four access bursts and ACCESS_BURST_TYPE indicate 8 bit access.
Mobile Station:
The MS is GPRS attached and in packet idle mode and Ready state.
Specific PICS Statements
-
P... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.5 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.6 Packet Downlink Assignment Timing Advance / TA value field not provided | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.6.1 Conformance requirements | For the case where a TIMING_ADVANCE_VALUE field is not provided in the assignment message, the mobile station is not allowed to send normal bursts on the uplink until it receives a valid timing advance either through the continuous timing advance procedure or in a PACKET TIMING ADVANCE/POWER CONTROL message.
Reference
... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.6.2 Test purpose | To verify that the mobile station does not send normal bursts on the uplink until it receives a valid timing advance in a PACKET POWER CONTROL/TIMING ADVANCE message if Timing Advance Value field is not provided in the PACKET DOWNLINK ASSIGNMENT message. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.1.2.2.6.3 Method of test | Initial conditions
System Simulator:
1 cell supporting EGPRS, CCCH combined with SDCCH.
Mobile Station:
The MS is GPRS attached and in packet idle mode. PDP context 2 has been established.
Specific PICS Statements
-
PIXIT Statements
-
Test procedure
The SS initiates downlink data transfer by sending IMMEDIATE ASSIGNMEN... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.2 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3 EGPRS Testcases for Dynamic Allocation in Packet Transfer Mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1 Dynamic Allocation / Uplink Transfer | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1 Dynamic Allocation / Uplink Transfer / Normal | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.1 Dynamic Allocation / Uplink Transfer / Normal / Successful | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.1.1 Conformance requirements | 1. The mobile station shall set the TFI field of each uplink RLC data block to the TFI value assigned to the mobile station in the PACKET UPLINK ASSIGNMENT or PACKET TIMESLOT RECONFIGURE message.
2. Whenever the mobile station detects an assigned USF value on an assigned PDCH, the mobile station shall transmit either a... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, default setting.
Mobile Station:
The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to initiate packet uplink transfer data in RLC unacknowledged mode. The SS o... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.2 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.3 Dynamic Allocation / Uplink Transfer / Normal / Starting frame number encoding | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.3.1 Conformance requirements | 1. In case of dynamic allocation, if no uplink TBF is in progress, the MS needs not monitor the USF field until the TDMA frame number occurs. When the indicated TDMA frame number occurs, the mobile station shall immediately begin to monitor the USF field and use the new assigned uplink TBF parameters when its USF occur... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.3.2 Test purposes | To verify that the MS, in transfer mode:
1. correctly uses the starting frame number description in PACKET UPLINK ASSIGNMENT, and in all subsequent RLC/MAC control messages which are sent on the uplink TBF;
2. is ready to receive or transmit no later than one radio block from the starting time;
3. is able to align the ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.3.3 Method of test | Initial Conditions
System Simulator:
1 cell, default setting,.
Mobile Station:
The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is triggered to initiate packet uplink transfer 440 octets in the RLC unacknowledged mod... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.4 Dynamic Allocation / Uplink Transfer / Normal / Starting time | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.4.1 Conformance requirements | 1 If a TBF starting time information element is present and no uplink TBF is in progress, but a downlink TBF is in progress, the mobile station shall wait until the starting time before beginning to monitor the USFs. While waiting for the starting time, the mobile station shall monitor the assigned PDCHs.
2 If an uplin... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.4.2 Test purposes | To verify that after the MS receives an uplink assignment with starting time:
1. if a downlink TBF is in progress and no uplink TBF is in progress it monitors the assigned PDCHs while waiting for the starting time. If another uplink assignment received while waiting, the mobile station acts upon that and ignores the pr... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.4.3 Method of test | Initial Conditions
System Simulator:
1 cell, default setting.
Mobile Station:
The MS is GPRS attached with a P-TMSI allocated and the test PDP context2 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
A downlink TBF is established and in progress. An uplink TBF is established with a starting time... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.5 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.6 Dynamic Allocation / Uplink Transfer / Normal / T3180 expiry | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.6.1 Conformance requirements | When the mobile station transmits an RLC/MAC block to the network, it shall start timer T3180. When the mobile station detects an assigned USF value on an assigned PDCH, the mobile station shall reset timer T3180. If timer T3180 expires, the mobile station shall perform the abnormal release with random access procedure... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.6.2 Test purposes | To verify that:
1. Timer T3180 will not expire as long as an USF for the MS under test is detected in the downlink blocks within the defined time period of the timer. (It is implicitly verified).
2. Timer T3180 expires if no USF for the MS under test is detected during a time period longer than T3180.
3. The MS perform... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.6.3 Method of test | Initial Conditions
System Simulator:
1 cell, default setting.
Mobile Station:
The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
An uplink TBF is established and in progress. After the MS sends an uplink data block the SS rep... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.7 Dynamic Allocation / Uplink Transfer / Normal / PACCH operation | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.7.1 Conformance requirements | 1. The mobile station shall attempt to decode every downlink RLC/MAC block on all assigned PDCHs. Whenever the mobile station receives an RLC/MAC block containing an RLC/MAC control block, the mobile station shall attempt to interpret the message contained therein. If the message addresses the mobile station, the mobil... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.7.3 Method of test | Initial Conditions
System Simulator:
1 cell, default setting.
Mobile Station:
The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
A TBF is established. It is polled with PACKET POLLING REQUEST containing a global TFI not addre... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.8 Dynamic Allocation / Uplink Transfer / Normal / Two uplink timeslots | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 52.3.1.1.8.1 Conformance requirements | Mobile station belonging to multislot class 3, 5, 6, 7 and 9 – 29 shall support at least two transmit timeslots per TDMA frame (refer to 3GPP TS 05.02, clause B.1).
References
3GPP TS 05.02, clause B.1. |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.