text
stringlengths
512
512
source_url
stringclasses
1 value
source_title
stringclasses
1 value
source_domain
stringclasses
1 value
license_type
stringclasses
1 value
attribution_required
bool
1 class
attribution_text
stringclasses
1 value
license_url
stringclasses
1 value
relevance_score
float64
0.32
0.8
quality_score
float64
0.42
0.87
topics
stringclasses
187 values
character_count
int64
512
512
subject_name
stringclasses
1 value
subject_type
stringclasses
1 value
extraction_date
stringdate
2026-09-23 02:21:56
2026-09-23 02:24:00
embedding
listlengths
384
384
and parking lots. Floor holes and openings will be protected by a cover or standard railing. Should the cover or railing need to be removed, the floor opening or hole will be constantly attended by an attendant assigned to warn others of the hazard. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.432
0.822
["war_conflict"]
512
OSHA Test
topic
2026-09-23T02:22:36.510418
[ 0.03738464415073395, 0.14185599982738495, 0.03036867268383503, 0.05622461438179016, 0.056174926459789276, 0.036916378885507584, 0.046598296612501144, -0.011944778263568878, 0.017368284985423088, 0.04740214720368385, 0.03155894577503204, 0.04189823940396309, -0.04589467868208885, 0.06689046...
resented here as historical content, for research and review purposes only. [Page 102] [Section Open-sided floors or platforms that are four or more feet above ground level will be] * OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE Document, and may no longer represe...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.575
0.842
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:36.576464
[ 0.04451622813940048, 0.09169291704893112, 0.00821500364691019, 0.01653105951845646, 0.044592633843421936, -0.027939556166529655, -0.09353918582201004, 0.08627928793430328, -0.038996633142232895, 0.04086887463927269, 0.001692736055701971, 0.05402403324842453, -0.012021644040942192, 0.052980...
vided with proper standard railing. When there is equipment that could fall from these elevations, the installation of a standard toe board is required. Scaffolds. There are several different types of scaffolds. Access to elevated locations or work at ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.531
0.83
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:36.642166
[ -0.027156738564372063, -0.026616087183356285, 0.022843027487397194, -0.024468516930937767, -0.019350387156009674, 0.05499356612563133, 0.011077487841248512, 0.07141972333192825, -0.07858407497406006, 0.0383664071559906, 0.041344236582517624, 0.035799045115709305, -0.03320922330021858, 0.08...
hat if the work cannot be performed from the ground or by other available means, the following general requirements for scaffolding will be met: 1. Scaffolds will be used only when work cannot be performed from the ground or from s...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.355
0.822
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:36.707892
[ -0.03667531907558441, -0.0319896936416626, -0.029967639595270157, -0.0412331260740757, 0.0075321984477341175, 0.04789968580007553, -0.06626331806182861, 0.020833011716604233, -0.043810825794935226, 0.05434432253241539, -0.01137677300721407, 0.0063571506179869175, -0.021298913285136223, 0.0...
carrying the intended load without settling or displacement. Unstable objects, including barrels, boxes, loose bricks or concrete blocks, will not be used to support scaffolds or planks. The use of base plates and mudsills is accep...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.369
0.822
[]
512
OSHA Test
topic
2026-09-23T02:22:36.773628
[ -0.028790226206183434, 0.027472060173749924, -0.029930472373962402, -0.004306830000132322, -0.03013397380709648, 0.008946645073592663, -0.05612029880285263, 0.029637280851602554, -0.05951577425003052, 0.05288325250148773, -0.02643626742064953, 0.02098984457552433, -0.02800452895462513, 0.0...
Never use the side frames to access the scaffold. 4. Scaffolds must be fully planked. The planks will not extend less than six inches and not more than 18 inches from the end. 5. Scaffolds will not be used during storms, high wind, or wh...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.362
0.676
[]
512
OSHA Test
topic
2026-09-23T02:22:36.839458
[ 0.04984687268733978, -0.017563262954354286, -0.015761293470859528, -0.05078046768903732, 0.02136623114347458, 0.055634334683418274, -0.0642690509557724, 0.06512995064258575, -0.07829295098781586, 0.04726263880729675, 0.0014739297330379486, 0.0857882872223854, -0.061964426189661026, 0.05368...
rd guardrails, toeboards, and will be properly cross-braced. 7. Mobile ladder stands and scaffolds will have positive wheel and/or swivel lock casters to prevent movement. 11-24 ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.539
0.802
[]
512
OSHA Test
topic
2026-09-23T02:22:36.905169
[ -0.05599473789334297, 0.03682814911007881, -0.04746478423476219, -0.05560843646526337, -0.013456186279654503, 0.04205343872308731, -0.027901312336325645, 0.033453214913606644, -0.025459473952651024, 0.1319824904203415, 0.07080579549074173, 0.025977391749620438, 0.05678516998887062, 0.03507...
ew purposes only. [Page 103] [Section CHAPTER 12. HAZARD COMMUNICATION] * OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy. CHAPTER 12. HAZARD COMMUNICATION I. Purpose ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.608
0.664
["communication"]
512
OSHA Test
topic
2026-09-23T02:22:36.971093
[ -0.02086966671049595, 0.12699845433235168, -0.007233812939375639, -0.022568047046661377, 0.10801561176776886, -0.03258087858557701, 0.011141685768961906, 0.06326515227556229, -0.04406879097223282, -0.0032402940560132265, 0.041554518043994904, -0.0005883978446945548, 0.02713801898062229, 0....
II. Scope This program applies to all work operations where there is exposure to hazardous chemicals that are known to be present in the workplace in such a manner that employees may be exposed under normal conditions of use or in a foreseeable emergency. The mere ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.452
0.846
["crisis"]
512
OSHA Test
topic
2026-09-23T02:22:37.037133
[ -0.005724495742470026, 0.06279263645410538, -0.021573754027485847, -0.033131279051303864, 0.057307031005620956, 0.026568137109279633, 0.08764515817165375, 0.0603141225874424, -0.11793964356184006, -0.05914297327399254, -0.009476147592067719, -0.03933635726571083, 0.0705631896853447, 0.0132...
ntial exposure to an employee. Consumer products are not covered by this program to the extent that the use of the products results in a duration and frequency of exposure that is not greater than that which could be reasonably be experienced by consumers. III. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.439
0.838
["communication", "management", "philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:37.102918
[ -0.002129555679857731, 0.04137034714221954, 0.024666830897331238, 0.001021557953208685, 0.04233282431960106, 0.005738983396440744, 0.05026176944375038, 0.04689273610711098, -0.038866106420755386, -0.033283937722444534, 0.01519762072712183, -0.040038663893938065, 0.02378121018409729, -0.033...
Program (HCP) in his or her office, acting as the representative of the Regional Administrator. 1. He or she may delegate the day-to-day responsibility for the HCP to one of the Assistant Area Directors or a senior industrial hygienist. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.555
0.818
["crisis"]
512
OSHA Test
topic
2026-09-23T02:22:37.168903
[ 0.0033907010219991207, 0.08966444432735443, 0.028283515945076942, -0.03163281828165054, -0.04309234395623207, 0.05613984167575836, 0.006332598626613617, 0.03865968436002731, -0.09947390109300613, -0.023979172110557556, -0.04273093864321709, -0.05683569237589836, 0.0196576789021492, -0.0100...
remains with the responsible OSHA Manager(s). Regional Offices – the Regional Hazard Communication Coordinator (RHCC), acting as the representative of the Regional Administrator, will have responsibility for the development and implementa...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.597
0.814
["communication", "management"]
512
OSHA Test
topic
2026-09-23T02:22:37.234957
[ -0.004942081868648529, -0.0006524711498059332, -0.04555674269795418, 0.06657059490680695, 0.020960960537195206, -0.019237875938415527, -0.023111358284950256, 0.035492125898599625, -0.04646002873778343, -0.00450357049703598, -0.030622607097029686, -0.02707241103053093, -0.024189690127968788, ...
ogram, the responsible OSHA Manager(s) and RHCC have the same responsibilities. IV. Procedure List of Hazardous Chemicals 12-25 * OSHA ARCHIVE DOCUMENT * NOTICE: This document i...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.599
0.8
["management"]
512
OSHA Test
topic
2026-09-23T02:22:37.300900
[ -0.02360369823873043, 0.013247722759842873, -0.07035255432128906, -0.014012289233505726, 0.07289724051952362, -0.037222787737846375, -0.044036298990249634, 0.14363931119441986, -0.08368309587240219, -0.0024681894574314356, -0.021840477362275124, -0.008758817799389362, -0.009037821553647518, ...
* OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy. 1. A list will be maintained of all hazardous chemicals used in the office and updated as necessary. This list will be developed by each...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.623
0.836
[]
512
OSHA Test
topic
2026-09-23T02:22:37.366852
[ -0.03843246027827263, 0.05816091224551201, -0.014353550970554352, 0.01879311166703701, 0.1398557424545288, 0.0046320753172039986, 0.017266836017370224, 0.07172341644763947, -0.07912969589233398, 0.031173035502433777, 0.015544968657195568, 0.0627848282456398, 0.011461110785603523, -0.008010...
corresponding Safety Data Sheet (SDS) for each chemical. Safety Data Sheet 1. A copy of an SDS for every substance on the list of hazardous chemicals in the Regional/Area office will be maintained. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.547
0.66
[]
512
OSHA Test
topic
2026-09-23T02:22:37.433186
[ 0.022387558594346046, -0.040672726929187775, -0.045425526797771454, -0.026818543672561646, 0.1030837669968605, 0.09001044183969498, 0.024414628744125366, 0.09129555523395538, -0.0040753730572760105, 0.005173243582248688, -0.008702143095433712, 0.008963724598288536, 0.020439641550183296, -0...
at all times. 3. Requisitions for hazardous chemicals are to include a request for the SDS. All SDSs will be reviewed for content and completeness. Additional research will be done if necessary. 4. SDSs of new...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.439
0.67
["management"]
512
OSHA Test
topic
2026-09-23T02:22:37.499020
[ -0.022971130907535553, 0.00541488965973258, -0.023886099457740784, -0.003742197761312127, 0.08637329190969467, 0.02274361252784729, 0.023008760064840317, 0.07546361535787582, -0.04191380739212036, -0.0042517888359725475, -0.004589592106640339, -0.026259426027536392, 0.020052524283528328, 0...
or his or her designee. Whenever possible, the least hazardous substance will be obtained. Warning Labels 1. All containers of hazardous chemicals in the office will be properly labeled. 2. All labels will include the id...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.368
0.664
["war_conflict"]
512
OSHA Test
topic
2026-09-23T02:22:37.564816
[ 0.04088409245014191, 0.06500852853059769, -0.03728094696998596, -0.007998230867087841, 0.06498104333877563, 0.05997132509946823, 0.11873485147953033, 0.08465695381164551, -0.004534910432994366, -0.0636555552482605, 0.029968127608299255, -0.09295546263456345, 0.04100754112005234, 0.04282354...
3. Each label will be checked with the corresponding SDS to verify the information. 4. Alternate labeling provisions, such as tags or markings, may be made for containers that are of unusual shape or size and do not eas...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.335
0.662
["strategy", "philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:37.630729
[ -0.002653610659763217, 0.0024317693896591663, -0.07717784494161606, -0.01886836439371109, 0.13500192761421204, 0.010315252467989922, 0.0989457368850708, 0.06307822465896606, 0.01841227151453495, -0.08072888106107712, 0.1098693385720253, -0.03590725362300873, 0.018155168741941452, 0.0171015...
beled container to a portable container, and that are intended only for the immediate use of the person who performs the transfer are not required to be labeled. Immediate use is defined in 29 CFR 1910.1200. Training ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.56
0.808
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:37.696638
[ -0.03650446981191635, 0.08238145709037781, -0.04651336371898651, 0.043363697826862335, 0.053416673094034195, -0.031708113849163055, 0.07795077562332153, 0.015356911346316338, -0.05136454477906227, -0.06140924617648125, 0.08580269664525986, 0.018961716443300247, -0.03204623982310295, 0.0423...
ent is presented here as historical content, for research and review purposes only. [Page 105] [Section Hazardous Chemicals Encountered on Work Sites] * OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.618
0.822
[]
512
OSHA Test
topic
2026-09-23T02:22:37.762444
[ -0.018021192401647568, 0.06629543751478195, 0.024113884195685387, -0.007569097448140383, 0.10523020476102829, -0.025307318195700645, 0.04083254560828209, 0.09353425353765488, -0.14840227365493774, -0.0027944804169237614, 0.0058748372830450535, 0.010839929804205894, 0.030610157176852226, 0....
in this Chapter. 2. New employees will receive training on the contents of this program and specific training on the chemicals that the individuals will be directly working with during orientation and prior to performing work where ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.557
0.808
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:37.828309
[ -0.013829982839524746, -0.017877699807286263, 0.018264442682266235, -0.002753954380750656, 0.03653227165341377, 0.10044735670089722, 0.07368249446153641, 0.03817003592848778, -0.12052827328443527, -0.08759081363677979, 0.034039512276649475, 0.018824327737092972, -0.01811538264155388, 0.026...
l is introduced into their work area. 4. As warranted, training may be provided based on the uniqueness of the hazards to be encountered at an inspection worksite. 5. The training program will emphasize the...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.385
0.656
["war_conflict"]
512
OSHA Test
topic
2026-09-23T02:22:37.893980
[ -0.016875939443707466, 0.0014624278992414474, 0.038480646908283234, -0.005519948434084654, 0.06630750745534897, 0.0911044180393219, 0.019114455208182335, 0.07574339956045151, -0.10865806043148041, -0.03460187837481499, -0.0009753723279573023, -0.0014778710901737213, 0.06786089390516281, -0...
. Hazardous chemical properties, including visual appearance and odor, and methods that can be used to detect the presence or release of hazardous chemicals; c. Physical and health hazards associated with potential exposu...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.429
0.792
[]
512
OSHA Test
topic
2026-09-23T02:22:37.959785
[ 0.0344710536301136, 0.0007777675054967403, 0.00511584896594286, 0.0009430752834305167, 0.039934806525707245, 0.047146063297986984, 0.06793220341205597, 0.0620807521045208, -0.04150380939245224, 0.014581606723368168, 0.03249737620353699, -0.12580497562885284, 0.015186840668320656, 0.0532509...
personal protective equipment, work practices, and emergency procedures; e. Hazardous chemical spill and leak procedures; and f. Location of SDSs, how to understand their content, and how ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.59
0.792
["crisis", "philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:38.025681
[ 0.029775748029351234, 0.0018819310935214162, 0.00871442724019289, -0.018103102222085, 0.08191309124231339, 0.06612975150346756, 0.09357927739620209, 0.11102018505334854, -0.06549937278032303, -0.015135576948523521, -0.016761133447289467, -0.005704658105969429, -0.003011693013831973, 0.0197...
Recognizing that the greatest potential for exposure to hazardous chemicals involves field exposures during the course of on-site activities, the following issues will be considered: 1. Field employees will identify potential hazards usin...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.578
0.802
[]
512
OSHA Test
topic
2026-09-23T02:22:38.091508
[ 0.04069346934556961, 0.045679520815610886, 0.016183767467737198, -0.042426515370607376, 0.11231066286563873, 0.0432903952896595, 0.09258202463388443, 0.08881229162216187, -0.09091395139694214, -0.012465287931263447, -0.03475575894117355, -0.056927524507045746, 0.023093631491065025, 0.09272...
a. Ensure that appropriate protective measures, including personal protective equipment, are available and utilized. b. Where protective measures are not adequate, OSHA employees must avoid exposure and contact th...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.488
0.63
["management"]
512
OSHA Test
topic
2026-09-23T02:22:38.157202
[ 0.0002835657214745879, 0.0736984834074974, 0.025548690930008888, 0.039487551897764206, 0.06395449489355087, -0.014788406901061535, 0.017095550894737244, 0.03249333053827286, -0.05356257036328316, 0.028453659266233444, 0.08075504004955292, -0.06282998621463776, 0.03895210474729538, 0.040285...
* OSHA ARCHIVE DOCUMENT * NOTICE: This document is presented here as historical content, for research and review purposes only. [Page 106] [Section Contract Employees] * OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE Document, and may no longer re...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.646
0.826
[]
512
OSHA Test
topic
2026-09-23T02:22:38.223147
[ -0.04540511965751648, 0.12580174207687378, 0.020564734935760498, 0.051329080015420914, 0.0823516771197319, -0.015702582895755768, -0.014667247422039509, 0.007528487592935562, -0.06539729982614517, 0.03206197917461395, 0.0039968062192201614, 0.09083617478609085, 0.02434450574219227, 0.03091...
hazard to OSHA employees will be handled in accordance with procedures outlined by OSHA’s Salt Lake City Technical Center. Contract Employees 1. Outside contractors will be advised of any chemical hazards that may be ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.629
0.816
[]
512
OSHA Test
topic
2026-09-23T02:22:38.289192
[ -0.032366249710321426, 0.07575590163469315, 0.036253225058317184, -0.015968047082424164, 0.06000460684299469, -0.014926345087587833, 0.041374627500772476, 0.034003350883722305, -0.04984118789434433, 0.00969413947314024, -0.00097817147616297, -0.01865706965327263, 0.0819239690899849, 0.0556...
f the location and availability of SDSs. 3. Each contractor bringing chemicals on-site must provide OSHA with the appropriate hazard information, including SDSs. All containers of hazardous chemicals brought on-site by an outside contractor...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.444
0.804
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:38.355295
[ 0.04744267836213112, 0.009602032601833344, -0.013064809143543243, -0.013731556944549084, 0.09395875036716461, 0.02846634015440941, 0.013872603885829449, 0.051086850464344025, -0.0517316497862339, -0.03691805899143219, -0.007055668625980616, -0.01683766022324562, 0.032089099287986755, 0.025...
k is planned in an OSHA office, affected employees must be informed of any chemical hazards associated with the performance of the task(s) and appropriate protective measures before such work is initiated. CHAPTER 13. CONTROL OF HAZARDOUS ENERGY SOURCES I. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.498
0.824
["philosophy", "management"]
512
OSHA Test
topic
2026-09-23T02:22:38.420877
[ 0.03164076432585716, 0.11639845371246338, -0.023719634860754013, 0.03130972012877464, 0.05386049672961235, -0.006397734861820936, 0.05488645285367966, 0.0037119388580322266, -0.04008273780345917, 0.025821702554821968, -0.002356460317969322, 0.025569293648004532, 0.06107685714960098, -0.065...
ut (LO/TO) Program. The policies and procedures in this Program are intended to set broad expectations for preventing OSHA employee injury or death from uncontrolled hazardous energy sources when there are no alternatives to conducting work activities where energy isol...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.613
0.826
[]
512
OSHA Test
topic
2026-09-23T02:22:38.486630
[ -0.05388762056827545, 0.045909710228443146, 0.04277201369404793, -0.024521604180336, 0.007397731300443411, -0.0424024760723114, 0.036380089819431305, 0.015243597328662872, -0.02305031381547451, -0.016078751534223557, -0.003275175578892231, -0.007725408300757408, 0.09408549964427948, 0.0398...
as needed. This Program is designed to protect OSHA employees from the inadvertent or unintended release of energy, movement, or flow in electrical potential, mechanical, or material systems, which could result in an injury or fatality to outside personnel as defined in 29...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.653
0.834
[]
512
OSHA Test
topic
2026-09-23T02:22:38.552495
[ -0.07178183645009995, 0.1327786147594452, -0.0023950019385665655, 0.01008228212594986, 0.0767454206943512, -0.028413791209459305, 0.013332200236618519, 0.044844068586826324, -0.06716545671224594, 0.006516100373119116, 0.011613385751843452, 0.025444546714425087, 0.059716444462537766, -0.010...
lly hazardous energy from machines or equipment is isolated using lockout devices before OSHA employees perform any activities (e.g., inspections) where unexpected energizing, start up, or release of stored energy could cause an injury or a fatality. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.602
0.814
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:38.618226
[ -0.02880128100514412, 0.07369989156723022, -0.008838605135679245, 0.029966864734888077, 0.08809517323970795, -0.016823124140501022, -0.013600391335785389, 0.01865130476653576, -0.00661444989964366, -0.006106906104832888, 0.03950975090265274, 0.10546009242534637, 0.06193458288908005, -0.022...
as historical content, for research and review purposes only. [Page 107] [Section Scope] * OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy. All OSHA employees are considered affected employees becaus...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.481
0.834
["career", "philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:38.684138
[ -0.03716179355978966, 0.08495525270700455, 0.026058882474899292, 0.051781702786684036, 0.0792192593216896, -0.023851845413446426, -0.012474234215915203, -0.06338559836149216, -0.09514858573675156, 0.016891619190573692, 0.06133414804935455, 0.11278211325407028, 0.020481865853071213, -0.0126...
s being performed. For the rare occasion when lockout devices are determined necessary, management will determine if and when a limited number of OSHA employees are considered authorized employees. If Directorate Directors, Regional Administrators (RA), and Area Directors (AD)...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.618
0.822
["strategy", "management", "decision_making", "philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:38.750086
[ -0.0007598027004860342, 0.027677446603775024, -0.01987091824412346, 0.058394044637680054, 0.07121390104293823, 0.017063766717910767, 0.0569075308740139, -0.07680172473192215, -0.004593343939632177, 0.006145486142486334, 0.06165138632059097, 0.08204301446676254, 0.013697042129933834, -0.003...
for affected employees in this program apply to that Region/Directorate. This Program assumes that OSHA is the outside employer and authorized OSHA employees may conduct work activities as outside personnel. Normally, OSHA employees are not expected to put themse...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.48
0.82
[]
512
OSHA Test
topic
2026-09-23T02:22:38.816322
[ 0.01566123217344284, 0.07663349062204361, 0.046024322509765625, 0.03423088416457176, 0.05593876540660858, -0.07591740041971207, 0.024133965373039246, -0.03442427143454552, -0.06872117519378662, -0.022131675854325294, 0.03951486572623253, -0.007031399291008711, -0.0016140941297635436, 0.000...
nts or visually inspecting equipment at an on-site employer’s worksite is considered maintenance or servicing. LO/TO program requirements apply if there is a potential for the unexpected energizing, start up or release of stored energy that could cause injury. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.604
0.828
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:38.882094
[ -0.09707541018724442, 0.05821653828024864, 0.003496284829452634, 0.02428530715405941, 0.07261154800653458, -0.04337521269917488, 0.05451783165335655, -0.019902044907212257, -0.06871688365936279, -0.029693670570850372, -0.08516094833612442, 0.02963912859559059, -0.028168322518467903, -0.021...
-site employer about OSHA’s LO/TO procedures as required in 29 CFR 1910.147(f)(2)(i) (see section V.C.1). This Program relies on an effective on-site employer LO/TO Program and OSHA employee’s ability to assess its effectiveness during the required information sharing ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.63
0.826
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:38.947900
[ -0.03891974315047264, 0.06366655975580215, -0.005158007610589266, 0.04118683934211731, 0.06344116479158401, -0.05337744578719139, 0.018029728904366493, 0.008035841397941113, -0.08835471421480179, -0.04907606169581413, -0.011541346088051796, 0.017214138060808182, 0.01821134425699711, 0.0277...
tside personnel if there is not an effective on-site employer LO/TO Program. II. Scope This LO/TO Program is intended to apply specifically to OSHA employees covered by the OSHA Field Safety and Health Manual—specifically OSHA employees conducting w...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.455
0.82
[]
512
OSHA Test
topic
2026-09-23T02:22:39.013694
[ -0.03483250364661217, -0.007846944034099579, -0.05284745618700981, 0.015280364081263542, 0.07327696681022644, -0.016034577041864395, 0.06941062957048416, 0.010407340712845325, -0.06341857463121414, -0.042757052928209305, 0.005872811656445265, 0.03471988067030907, 0.0005058083334006369, 0.0...
referred to as the on-site employer as established in 29 CFR 1910.147(f)(2)(i). The procedures in this program do not provide OSHA-owned equipment-specific LO/TO procedures required by 29 CFR 1910.147 for equipment at OSHA facilities. Regions/Directorates that ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.443
0.814
[]
512
OSHA Test
topic
2026-09-23T02:22:39.079582
[ -0.061309151351451874, 0.05621965974569321, -0.03801971301436424, 0.0059012770652771, 0.05512816458940506, -0.0820692926645279, -0.01833905093371868, 0.027955075725913048, -0.06624976545572281, -0.07387706637382507, 0.03697441518306732, -0.019504517316818237, 0.043088458478450775, 0.026787...
-owned equipment that is consistent with, and at least as protective as, 29 CFR 1910.147. The RA/Directorate Director will provide information about LO/TO procedures to personnel servicing OSHA equipment as the on-site employer and will ensure that they are inf...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.458
0.83
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:39.145314
[ -0.08606838434934616, 0.046014267951250076, -0.04283152520656586, 0.034475769847631454, 0.06583454459905624, -0.08934889733791351, 0.028286732733249664, 0.043824952095746994, -0.0491781085729599, -0.026939721778035164, 0.003893983783200383, 0.053371984511613846, 0.07066763937473297, 0.0149...
vered in Chapter 6, Office Safety and Health. When there is a potential for exposure to energized parts, Chapter 22, Electrical Safety provides necessary procedures for electrical hazard recognition and avoidance. 13-29 ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.608
0.812
[]
512
OSHA Test
topic
2026-09-23T02:22:39.210997
[ -0.01673649437725544, 0.06400194764137268, 0.0666121393442154, 0.0017452145693823695, 0.12136510759592056, -0.02742641605436802, 0.021586989983916283, 0.08218072354793549, -0.060410548001527786, 0.02100958675146103, 0.026111697778105736, 0.021888386458158493, 0.05182778090238571, 0.0405178...
review purposes only. [Page 108] [Section III.] * OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy. III. References 29 Code of Federal Regulations Section 1910.147, The Control of Haz...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.604
0.666
[]
512
OSHA Test
topic
2026-09-23T02:22:39.276877
[ -0.06241131201386452, 0.06646598130464554, -0.02456367015838623, 0.062199175357818604, 0.07680065184831619, -0.0009330473840236664, -0.06391233950853348, 0.05116240307688713, -0.06113538518548012, 0.018969926983118057, 0.026555845513939857, 0.08581019192934036, 0.01187124103307724, -0.0365...
29 CFR 1926, Subpart V, Electrical Power Transmission and Distribution CPL 02-00-147, The Control of Hazardous Energy, Enforcement Policy and Inspection Procedures, dated February 11, 2008 OSHA Field Safety and Health Manual, Chapter 6, Office Safety and Health ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.645
0.826
[]
512
OSHA Test
topic
2026-09-23T02:22:39.343039
[ -0.010760313831269741, 0.06950659304857254, 0.05778999254107475, 0.08127370476722717, 0.06299743801355362, -0.021353397518396378, -0.0106633510440588, 0.03375096991658211, -0.05499725788831711, -0.019201628863811493, 0.04881707951426506, 0.011662716045975685, 0.03374050557613373, 0.0146609...
OSHA employee that may conduct activities in an area in which LO/TO procedures are being used. All OSHA employees are potentially affected employees since they may encounter LO/TO devices at an OSHA facility or at another employer’s worksite. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.487
0.826
[]
512
OSHA Test
topic
2026-09-23T02:22:39.409017
[ -0.0033786713611334562, 0.06010536104440689, -0.004679733421653509, 0.025778332725167274, 0.048747021704912186, -0.07765206694602966, 0.09413785487413406, -0.07073909789323807, -0.03589525446295738, -0.00504706334322691, 0.019350165501236916, 0.04398859664797783, 0.014643942937254906, 0.03...
nee to use a lockout device. Authorized OSHA Employees will use a lock only in a group lockout that includes the on-site employer’s primary authorized employee in order to perform inspection activity on a machine or piece of equipment. Energy Is...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.47
0.826
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:39.475117
[ -0.1291486620903015, 0.09655129164457321, -0.0460377037525177, 0.028746072202920914, 0.06475399434566498, -0.005558142438530922, 0.11080864816904068, -0.04332796484231949, 0.04132404550909996, -0.02117970958352089, 0.07051011919975281, 0.06901507824659348, 0.02253452129662037, -0.066121697...
ited to manually operated circuit breakers, disconnect switches, line valves, a block and any similar devices. Push buttons, selector switches and other control circuits are not acceptable as energy isolating devices. Lockout Device is a devic...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.373
0.83
[]
512
OSHA Test
topic
2026-09-23T02:22:39.541123
[ -0.05934678763151169, 0.07949575036764145, -0.04243794083595276, 0.031344763934612274, -0.014795562252402306, 0.05468624830245972, 0.09480910748243332, -0.013528132811188698, 0.029601851478219032, 0.06346528232097626, 0.09463222324848175, 0.04584117978811264, -0.01710432767868042, -0.04856...
d prevent the energizing of a machine or equipment (e.g. blank flanges and bolted slip blinds). Each lockout device will be supplied with a tag that meets the requirements of 29 CFR 1910.147, is intended for use in group lockout, and includes a tag that identifies ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.381
0.846
["resume", "war_conflict"]
512
OSHA Test
topic
2026-09-23T02:22:39.607025
[ -0.08359930664300919, 0.051329586654901505, -0.08155208826065063, -0.037948720157146454, 0.05211428552865982, 0.03982176259160042, 0.03479314222931862, 0.026189275085926056, 0.04943111911416054, -0.06172323599457741, 0.12187027931213379, 0.028013309463858604, 0.012351365759968758, -0.02858...
of attachment, that can be securely fastened to an energy isolating device in accordance with an established procedure to indicate that the energy isolating device and the equipment being controlled may not be operated until the tagout device is removed. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.563
0.818
[]
512
OSHA Test
topic
2026-09-23T02:22:39.673061
[ -0.03667590767145157, 0.15955446660518646, -0.025452814996242523, 0.07052317261695862, 0.0343206524848938, -0.08120741695165634, 0.05614291504025459, -0.007685608230531216, 0.009257268160581589, -0.0030842225532978773, 0.12518814206123352, 0.09652184695005417, 0.015225347131490707, 0.00905...
ted here as historical content, for research and review purposes only. [Page 109] [Section Responsibilities] * OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy. For this Program, only lockout device...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.602
0.822
[]
512
OSHA Test
topic
2026-09-23T02:22:39.739025
[ -0.10134061425924301, 0.09130044281482697, -0.03712897375226021, 0.06017907336354256, 0.05574500933289528, 0.008511661551892757, -0.007281516678631306, 0.005693196319043636, -0.057184331119060516, 0.043130744248628616, 0.01263565756380558, 0.07737140357494354, 0.0053255436941981316, -0.023...
RAs/Directorate Directors and Area Office Directors/equivalents or designees will: 1. Decide if employees are authorized to conduct work activities that require LO/TO procedures on rare occasions when no alternatives are available. 2. P...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.605
0.654
["decision_making"]
512
OSHA Test
topic
2026-09-23T02:22:39.805024
[ -0.07796303182840347, -0.008609702810645103, -0.012909088283777237, 0.03870625048875809, 0.025363145396113396, -0.028175417333841324, 0.04179096966981888, -0.04212455078959465, -0.0438593327999115, -0.027329109609127045, -0.019839806482195854, 0.006746819708496332, 0.0037703511770814657, 0...
3. Request assistance from SLTC’s Health Response Team (HRT) when investigations and inspections require hazardous energy isolation and the Region or Directorate does not have the resources to safely implement LO/TO procedures. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.624
0.806
["management"]
512
OSHA Test
topic
2026-09-23T02:22:39.870882
[ -0.07903576642274857, 0.09874381124973297, 0.01881950907409191, 0.041261348873376846, 0.07930956780910492, -0.09195426106452942, -0.024907661601901054, 0.08004028350114822, -0.08181732892990112, -0.039272259920835495, 0.05164080858230591, -0.02242361381649971, 0.03480221703648567, -0.02509...
ent in which the unexpected energization or startup of the machines or equipment, or release of stored energy could harm OSHA employees or outside servicing personnel. Determine if authorized OSHA employees are expected to isolate hazardous ene...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.644
0.81
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:39.936914
[ -0.03709208220243454, 0.10355104506015778, 0.018467025831341743, 0.029036780819296837, 0.09667979925870895, -0.07089832425117493, 0.07650619745254517, 0.04088398069143295, -0.051163945347070694, 0.014092456549406052, 0.01785588078200817, 0.003997063729912043, 0.03432587534189224, -0.004586...
rmation about LO/TO procedures to outside personnel servicing OSHA equipment and share information about the servicing personnel’s LO/TO procedures before work begins (29 CFR 1910.147(f)(2)). If RAs, Directorate Directors, Area Office Directors or designees d...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.483
0.806
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:40.002664
[ -0.060605958104133606, 0.050389014184474945, -0.03137983754277229, -0.005735666491091251, 0.029853366315364838, -0.0454917848110199, 0.049973830580711365, -0.021301323547959328, -0.01160414982587099, 0.004461021162569523, 0.04270101338624954, 0.07292594015598297, 0.04646340385079384, -0.01...
must: 1. Develop local procedures for LO/TO program implementation to supplement this Program. 2. Select employees who are authorized to implement LO/TO procedures in this Program and that have the knowledge...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.433
0.8
["resume", "education"]
512
OSHA Test
topic
2026-09-23T02:22:40.068492
[ -0.003262741956859827, 0.06402834504842758, 0.028899922966957092, -0.03602883592247963, -0.012646974064409733, -0.018063457682728767, 0.02490045316517353, 0.025802411139011383, -0.10999801754951477, -0.03035498782992363, -0.016457879915833473, -0.0311427004635334, 0.038409292697906494, 0.0...
that selected authorized OSHA employees understand the purpose of the LO/TO program and, at a minimum: a. Can recognize hazardous energy sources; b. Will represent this chapter and local procedures as OS...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.632
0.796
[]
512
OSHA Test
topic
2026-09-23T02:22:40.134599
[ -0.03149637207388878, 0.08284039795398712, 0.004695007111877203, -0.009300803765654564, 0.07253117114305496, -0.042315490543842316, 0.06840627640485764, -0.006480682175606489, -0.07755520939826965, -0.06136780604720116, -0.04477559030056, -0.004584844224154949, 0.036919210106134415, 0.0124...
CFR 1910.147(f)(2)(i); 13-31 * OSHA ARCHIVE DOCUMENT * NOTICE: This document is presented here as historical content, for research and review purposes only. [Page 110] * OSHA ARCHIVE DOCUME...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.633
0.808
[]
512
OSHA Test
topic
2026-09-23T02:22:40.200355
[ -0.07615956664085388, 0.08775203675031662, -0.020056545734405518, 0.05226766690611839, 0.10089781880378723, -0.013713099993765354, -0.07082025706768036, 0.02673758566379547, -0.08380256593227386, -0.00425378093495965, 0.01740691438317299, 0.054970040917396545, 0.0052932570688426495, 0.0093...
ify the on-site employers LO/TO program and procedures are effective (e.g. interviews and contacting equipment manufacturers); d. Know the importance of considering alternative methods and how to identify them for ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.568
0.646
["interview"]
512
OSHA Test
topic
2026-09-23T02:22:40.266379
[ -0.038021743297576904, 0.05412331223487854, -0.01701807603240013, -0.021626658737659454, 0.044449206441640854, 0.004958073142915964, 0.034339722245931625, 0.09409935027360916, -0.11295172572135925, -0.04696012660861015, -0.03935100883245468, 0.008543452247977257, -0.002308269962668419, 0.0...
this Program; and f. Voluntarily accept assigned tasks and is willing to perform authorized OSHA employees responsibilities. Should safety concerns arise when locking out equipment or machines...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.482
0.796
["management", "philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:40.332465
[ -0.03133241832256317, 0.09353477507829666, -0.05806927755475044, -0.008106952533125877, 0.05206457898020744, 0.0020392497535794973, 0.06899236142635345, 0.013920956291258335, -0.08097969740629196, 0.00807485356926918, 0.01642073690891266, 0.040919579565525055, 0.010970334522426128, -0.0024...
employer and OSHA management from a safe location. 3. Issue each Authorized OSHA Employee a lockout device with a key. The lockout device type should be standardized within each Office and in compliance with 29 CFR 1910...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.494
0.662
["management"]
512
OSHA Test
topic
2026-09-23T02:22:40.398582
[ -0.01296939142048359, 0.038966964930295944, -0.030526436865329742, -0.01644180528819561, 0.02194310538470745, 0.04573105275630951, 0.025914784520864487, -0.046294812113046646, -0.026946304365992546, -0.010581105016171932, 0.06895487755537033, 0.049644164741039276, -0.010717247612774372, 0....
4. Determine if authorized OSHA employees will maintain their lockout devices or if all lockout devices will be maintained in a central location until they are needed for approved LO/TO procedures. Include specifics in the local LO...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.605
0.826
[]
512
OSHA Test
topic
2026-09-23T02:22:40.464381
[ 0.00374599639326334, 0.05179717019200325, 0.026992352679371834, -0.023786284029483795, 0.04161861538887024, 0.0165614765137434, 0.040870070457458496, -0.06431224942207336, -0.015183981508016586, 0.0013845765497535467, 0.06172145903110504, 0.061285898089408875, -0.002508495468646288, -0.060...
key will be only used with the Area Office Director/designee’s approval. The spare key may be provided to the authorized OSHA employee if they misplace their key or may be used to remove the lock from an energy isolated device in accordance wi...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.398
0.822
[]
512
OSHA Test
topic
2026-09-23T02:22:40.530033
[ -0.08952455222606659, 0.07546737790107727, 0.00622242596000433, -0.03134528174996376, 0.0479712076485157, -0.023938916623592377, 0.05525936186313629, 0.005701512098312378, 0.050719209015369415, 0.002209265483543277, 0.06932604312896729, 0.08011454343795776, 0.04631613567471504, -0.09361010...
the following: a. Are alternative methods a better option to obtain necessary information? b. Is the information critical to the inspection? c. Is the on-s...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.618
0.63
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:40.595947
[ -0.01953766867518425, 0.15914314985275269, 0.010411267168819904, 0.007311141584068537, 0.07850047200918198, -0.01248941384255886, 0.0009927010396495461, 0.04903646931052208, -0.1036100760102272, 0.011778261512517929, -0.01327386312186718, 0.048347607254981995, -0.04902006685733795, -0.0452...
A ARCHIVE DOCUMENT * NOTICE: This document is presented here as historical content, for research and review purposes only. [Page 111] [Section OSHA employees are responsible for following this Program and Region or] * OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE D...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.644
0.832
[]
512
OSHA Test
topic
2026-09-23T02:22:40.661719
[ -0.02529362216591835, 0.15373589098453522, 0.0092317508533597, 0.032663993537425995, 0.06368786096572876, -0.024304110556840897, -0.030737614259123802, -0.006097668781876564, -0.06666884571313858, 0.006850040517747402, -0.0009589568362571299, 0.07563989609479904, 0.006866956129670143, 0.01...
yee who used LO/TO procedures following each approved lock application. OSHA regulation 29 CFR 1910.147(c)(6) requires periodic inspections of the LO/TO procedure(s) at least annually. Post-use evaluations, conducted following e...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.586
0.796
["resume"]
512
OSHA Test
topic
2026-09-23T02:22:40.727938
[ -0.10627762228250504, 0.03803745657205582, 0.013458535075187683, -0.008817854337394238, 0.059428926557302475, -0.055684857070446014, 0.02425057254731655, -0.021157948300242424, 0.021066749468445778, -0.016231242567300797, 0.03756050392985344, 0.03889214247465134, -0.0011372871231287718, -0...
y Sources Pre-Request for Approval Checklist and Post-Application Evaluation). OSHA employees are responsible for following this Program and Region or Directorate specific procedures. OSHA employees designated as authorized by their direc...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.64
0.806
["resume"]
512
OSHA Test
topic
2026-09-23T02:22:40.793830
[ 0.00888116005808115, 0.05427199974656105, 0.006204035598784685, 0.05017276853322983, 0.10035153478384018, -0.06517428904771805, 0.020453978329896927, -0.02658911980688572, -0.03401460498571396, -0.002919580787420273, 0.004867299925535917, 0.007463823072612286, -0.02723626047372818, 0.02256...
zardous energy will: 1. Obtain information about the on-site employer’s LO/TO program and provide the on-site employer with the following OSHA LO/TO Program description orally or in writing to meet requirements in 29 CFR ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.591
0.648
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:40.859718
[ -0.07988792657852173, 0.07863451540470123, -0.06744340062141418, 0.02072877250611782, 0.059046920388936996, -0.07289816439151764, 0.05403571575880051, 0.04576139897108078, -0.06559818983078003, -0.09009873121976852, -0.013708683662116528, -0.0113821467384696, 0.0049920352175831795, 0.00689...
a. All OSHA employees are considered affected employees. b. A limited number of OSHA employees are authorized employees and allowed, only under specific scenarios, to use a lockout device as outside pe...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.642
0.642
[]
512
OSHA Test
topic
2026-09-23T02:22:40.925548
[ 0.030083859339356422, 0.04686632379889488, 0.033481352031230927, 0.02523917704820633, 0.06047920137643814, -0.016792641952633858, 0.04945893958210945, -0.0771050900220871, -0.03645744174718857, -0.008708209730684757, 0.0529802180826664, 0.055743757635354996, 0.011327171698212624, -0.011115...
c. Authorized OSHA employees will verify that the on-site employer LO/TO program is effective before proceeding with local OSHA management approval processes. d. Authorized OSHA employees will never have the only...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.621
0.806
["management"]
512
OSHA Test
topic
2026-09-23T02:22:40.991193
[ -0.043987832963466644, 0.06969320774078369, 0.013786480762064457, 0.026825716719031334, 0.07482754439115524, -0.027972344309091568, 0.0404670313000679, -0.06735819578170776, -0.020587479695677757, -0.012717616744339466, 0.028282364830374718, 0.06823091208934784, 0.00034008975489996374, -0....
group lockout that includes at least one on-site authorized employee. e. At any time, the on-site employer, OSHA employee or their management may cancel any activity if it is determined unsafe. 13-33 ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.588
0.812
["management"]
512
OSHA Test
topic
2026-09-23T02:22:41.057123
[ -0.02708423137664795, 0.07416674494743347, -0.03720593824982643, 0.031573984771966934, 0.06606263667345047, 0.03568638861179352, 0.06126312538981438, -0.11249421536922455, -0.004592877812683582, -0.007299267686903477, 0.05972309410572052, 0.0677788034081459, -0.005689670331776142, -0.05558...
and review purposes only. [Page 112] [Section Safe Alternatives] * OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy. 2. Perform LO/TO procedures in accordance with this Program (e.g. requ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.633
0.656
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:41.122916
[ -0.05359828844666481, 0.14443853497505188, -0.031742680817842484, 0.024214239791035652, 0.11773060262203217, -0.04310372471809387, -0.014645904302597046, -0.013463443145155907, -0.0899227038025856, 0.009803861379623413, 0.0037120941560715437, 0.06424765288829803, 0.010998668149113655, -0.0...
3. Participate in post-evaluations conducted by OSHA RA, Directorate Director and/or Area Office Director, or designees each time LO/TO procedures are implemented. VI. Safe Alternatives The following lists some options for...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.618
0.658
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:41.188731
[ -0.02175929956138134, 0.11883004009723663, -0.07599273324012756, 0.01825721189379692, 0.08215641975402832, -0.03371744602918625, 0.014275345019996166, 0.07470385730266571, -0.02779143489897251, 0.0464867502450943, 0.043319009244441986, -0.014299874193966389, 0.036764755845069885, 0.0093850...
m a safe location (e.g. a camera connected to an engineering rod, camera equipped with zoom lens or video equipment); Electronic measurement devices used from a safe distance/location (e.g. laser measurement device); Employer provided diagrams, dr...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.526
0.804
["interview"]
512
OSHA Test
topic
2026-09-23T02:22:41.254860
[ 0.032339420169591904, 0.0047153569757938385, -0.06477286666631699, -0.052677713334560394, 0.04647388681769371, -0.006129920482635498, 0.0791478157043457, 0.08657865226268768, -0.01353025808930397, 0.06883376836776733, 0.10710296034812927, -0.02464977838099003, 0.12658533453941345, -0.01964...
intenance personnel and machine or equipment operators; and Seek assistance from employer-authorized personnel in obtaining measurements and evidence. VII. Procedures All OSHA employees, when working near equipment that is locked or tagged out, bu...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.441
0.814
[]
512
OSHA Test
topic
2026-09-23T02:22:41.320779
[ -0.04899059608578682, 0.06240132451057434, -0.013028547167778015, 0.0001598915841896087, 0.040427349507808685, -0.057748205959796906, 0.08828632533550262, -0.019634759053587914, -0.05802561342716217, 0.012449908070266247, 0.07802761346101761, 0.020991601049900055, -0.004017463885247707, -0...
are in place; and 2. Do not conduct activities that could lead to an exposure to the hazardous energy if released. In the rare occasion when an authorized employee needs to use a LO/TO device, the authorized OSHA employee will first consider all other al...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.44
0.84
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:41.386615
[ -0.02415521629154682, 0.09269225597381592, 0.013490387238562107, 0.00882167648524046, 0.06732384115457535, -0.04517402499914169, 0.060119807720184326, -0.030770594254136086, 0.004413889721035957, -0.017121560871601105, 0.07363022863864899, 0.07832035422325134, 0.027172133326530457, -0.0164...
loyee will share information with the on-site employer about equipment-specific LO/TO procedures. The authorized OSHA employee must verify that the on-site employer’s procedures are effective in identifying and isolating all applicable hazardous energy sources, and must obtain approval from ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.472
0.808
["management", "philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:41.452480
[ -0.10033761709928513, 0.083438441157341, 0.0250575989484787, -0.013817191123962402, 0.0908985286951065, -0.06420427560806274, 0.08443639427423477, -0.06459543853998184, -0.04715614765882492, -0.06501147896051407, -0.009563172236084938, 0.0338369645178318, -0.02079758420586586, -0.038738220...
13-34 * OSHA ARCHIVE DOCUMENT * NOTICE: This document is presented here as historical content, for research and review purposes only. [Page 113] [Section When inspecting a machine or equipment that uses an electrical cord for power and] ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.615
0.834
[]
512
OSHA Test
topic
2026-09-23T02:22:41.518293
[ -0.06755942851305008, 0.12321300804615021, -0.01257619820535183, 0.03987458720803261, 0.06935863941907883, -0.0670560896396637, -0.050906408578157425, 0.0026510427705943584, -0.04058700427412987, 0.04756348207592964, 0.09800534695386887, 0.10192476958036423, 0.027366410940885544, 0.0170610...
cting a machine or equipment that uses an electrical cord for power and the OSHA employee is required to place any part of his or her body into the point of operation or danger zone, the OSHA employee should ask the on-site employer representative to unplug it. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.47
0.848
[]
512
OSHA Test
topic
2026-09-23T02:22:41.584251
[ -0.053492605686187744, 0.05129498615860939, -0.03661945462226868, 0.023272525519132614, -0.022212594747543335, -0.024760795757174492, 0.038789570331573486, -0.009632857516407967, -0.0603790357708931, 0.04829825088381767, 0.08442535251379013, 0.05442051962018013, 0.03609331697225571, 0.0166...
When an OSHA employee makes an initial determination that an inspection activity (e.g. taking measurements, conducting a visual inspection) may require controlling hazardous energy sources, either before or during an inspection, the employee must ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.462
0.652
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:41.650018
[ 0.015783732756972313, 0.07624360173940659, 0.043026696890592575, 0.04778850078582764, 0.0430910624563694, -0.028498025611042976, 0.06276043504476547, -0.0420692153275013, -0.037715744227170944, 0.04241366311907768, 0.034564193338155746, -0.017981871962547302, 0.014596041291952133, -0.00950...
2. If no alternatives are identified: a. Thoroughly review the on-site employer’s LO/TO program, including any machine-specific procedures, and determine the program’s effectiveness. The OSHA employee must intervi...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.477
0.79
["interview"]
512
OSHA Test
topic
2026-09-23T02:22:41.715852
[ -0.061707641929388046, 0.056016210466623306, 0.012887446209788322, 0.002428053878247738, 0.06949004530906677, -0.04421263933181763, 0.04241763800382614, -0.0020614678505808115, -0.11256920546293259, -0.06508880108594894, -0.030445976182818413, 0.04959115386009216, 0.015569808892905712, -0....
oyee(s) are thoroughly familiar with the equipment, its hazardous energy sources, and any procedures in place for isolating and controlling hazardous energy. b. Obtain and review any manufacturer’s information on LO/TO ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.602
0.648
["management", "philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:41.781800
[ -0.07758747786283493, 0.08325091004371643, 0.016521459445357323, 0.039057470858097076, 0.06874987483024597, -0.11823011934757233, 0.08701948076486588, 0.0008121944847516716, -0.018274204805493355, -0.028615865856409073, -0.014834962785243988, 0.015582689084112644, 0.0037359364796429873, -0...
are requesting to lock out hazardous energy to conduct inspection activities. 4. OSHA management and the OSHA employee requesting the approval will discuss and consider all alternatives. If no alternatives are ide...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.433
0.804
["management", "decision_making"]
512
OSHA Test
topic
2026-09-23T02:22:41.847547
[ -0.051295168697834015, 0.08990970999002457, 0.08336818963289261, 0.013939669355750084, 0.1137019544839859, -0.08451098948717117, 0.07382633537054062, -0.020095571875572205, -0.035458870232105255, -0.009440974332392216, -0.0056678070686757565, -0.030857181176543236, -0.004509958438575268, -...
: 1. The requesting employee will continue with the inspection activities as an authorized OSHA employee; or 2. Another authorized OSHA employee will proceed with the inspection activities. ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.622
0.792
["management"]
512
OSHA Test
topic
2026-09-23T02:22:41.913393
[ -0.03934377804398537, 0.04714098200201988, 0.05443970113992691, -0.002535406732931733, 0.0540492981672287, -0.08110111206769943, 0.08912055939435959, -0.05483614653348923, -0.04990294203162193, -0.046653445810079575, 0.022382434457540512, 0.01617790386080742, 0.040304649621248245, 0.002511...
13-35 * OSHA ARCHIVE DOCUMENT * NOTICE: This document is presented here as historical content, for research and review purposes only. [Page 114] [Section VIII. Training] * OSHA ARCHIVE DOCUMEN...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.481
0.812
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:41.980355
[ -0.034457676112651825, 0.1147368773818016, 0.0066625457257032394, 0.05509786680340767, 0.07920365780591965, -0.031343091279268265, -0.048173703253269196, -0.0046603805385529995, -0.11326078325510025, -0.003392646089196205, -0.008043698035180569, 0.07873882353305817, 0.020516999065876007, -...
employer about OSHA’s LO/TO Program including the procedure for the host employer to follow if a lock is left in place after the OSHA employee leaves the facility. 2. Comply with OSHA requirements under 29 CFR 1910.147 and follow the ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.468
0.66
[]
512
OSHA Test
topic
2026-09-23T02:22:42.047399
[ -0.0598330944776535, 0.06714772433042526, -0.000550168682821095, -0.012609180063009262, 0.07513608038425446, -0.006292455829679966, 0.015021872706711292, -0.04521360620856285, -0.0888192430138588, -0.03615133836865425, 0.0352620966732502, 0.03808114305138588, 0.007318529766052961, 0.019535...
yee(s) fully de-energized the equipment/machine and utilized an appropriate and effective energy isolating device(s) for the equipment/machine. 4. Place his or her lock(s) on each isolating device for the equipment as part of ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.572
0.81
[]
512
OSHA Test
topic
2026-09-23T02:22:42.113450
[ -0.09629873186349869, 0.12499196082353592, 0.009960673749446869, 0.007720482535660267, 0.03923714533448219, -0.017903044819831848, 0.08823288977146149, -0.09262808412313461, -0.0030840446706861258, -0.018774062395095825, 0.11232352256774902, 0.103382907807827, 0.02564132958650589, -0.06181...
he on-site employer’s authorized employee. 5. Ensure that the on-site employer’s authorized employee verifies that the hazardous energy source is controlled after ensuring that personnel are not potentially exposed to the hazardous energy...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.611
0.652
[]
512
OSHA Test
topic
2026-09-23T02:22:42.179273
[ -0.0392545610666275, 0.06712525337934494, 0.02321918122470379, 0.006030640564858913, 0.05960375815629959, -0.057051848620176315, 0.07627057284116745, -0.026854954659938812, -0.07194121927022934, -0.0642813891172409, 0.012383460998535156, 0.018521243706345558, 0.010572463274002075, 0.038324...
Authorized OSHA employees applying LO/TO procedures will: a. Limit the time for conducting work activities that require hazardous energy LO/TO to the absolute minimum needed to complete tasks. b. Remove only their ene...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.608
0.646
["management"]
512
OSHA Test
topic
2026-09-23T02:22:42.245558
[ -0.06935669481754303, 0.08907835930585861, 0.029033100232481956, 0.0003567781241144985, 0.056665532290935516, -0.08151564747095108, 0.044801946729421616, -0.05702578276395798, 0.0017191373044624925, -0.013336154632270336, 0.017864923924207687, 0.010861569084227085, 0.009005988948047161, 0....
is complete when lockout devices are removed. 8. If the lockout device is unintentionally left on the equipment after leaving the worksite, the on-site employer will contact the appropriate OSHA Office befo...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.572
0.808
["management"]
512
OSHA Test
topic
2026-09-23T02:22:42.311480
[ -0.041943714022636414, 0.1207055002450943, 0.05075572431087494, -0.008318968117237091, 0.08081837743520737, 0.005458338186144829, 0.02750057727098465, -0.09130378812551498, 0.03710860759019852, -0.047226257622241974, 0.07040715217590332, 0.12212824076414108, -0.06600083410739899, -0.043534...
ill return to the site to remove the lock. Where the OSHA employee cannot return to the site, the OSHA employee’s responsible OSHA Manager(s) may authorize removing the lockout device(s) only after the OSHA employee’s location is ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.574
0.82
["management"]
512
OSHA Test
topic
2026-09-23T02:22:42.377499
[ -0.057841695845127106, 0.08526007831096649, -0.004526018630713224, 0.017099767923355103, 0.061786361038684845, 0.021838750690221786, 0.06177162751555443, -0.1410943865776062, -0.026375820860266685, -0.007916856557130814, 0.09105999022722244, 0.08606236428022385, -0.02235664799809456, -0.04...
ining is based on expected work activities as described below: 13-36 * OSHA ARCHIVE DOCUMENT * NOTICE: This document is presented here as historical content, for research and review purposes only. [Page 115] [Section All OSHA em...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.495
0.82
[]
512
OSHA Test
topic
2026-09-23T02:22:42.443307
[ -0.036602817475795746, 0.09545650333166122, 0.02448616735637188, 0.04098706692457199, 0.07924415171146393, -0.06990673393011093, -0.047573450952768326, 0.01315990835428238, -0.053878799080848694, 0.03633284568786621, 0.01348976232111454, 0.08080132305622101, 0.02349000610411167, 0.00294982...
CE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy. All OSHA employees, including affected and authorized employees, will receive training annually about this LO/TO Program and the Directorate/Area Office procedures, purpose, functi...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.457
0.818
[]
512
OSHA Test
topic
2026-09-23T02:22:42.509401
[ -0.03681080415844917, 0.051359694451093674, 0.030780920758843422, 0.02601807750761509, 0.06150272861123085, -0.027387285605072975, 0.012232939712703228, -0.02702304534614086, -0.02436101622879505, -0.034349825233221054, 0.029643764719367027, -0.04326961562037468, 0.04835963249206543, 0.011...
annually or when conditions change that includes: 1. How to identify hazardous energy sources they might encounter during inspections at another employer’s worksite; 2. Energy types and magnitudes they may encounter at another employer’...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.589
0.796
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:42.575192
[ -0.03109707124531269, 0.08352454006671906, 0.07842876762151718, 0.037288691848516464, 0.09522663801908493, 0.011555754579603672, 0.006043622735887766, -0.049775030463933945, -0.06589433550834656, -0.013653408735990524, -0.022036321461200714, -0.12329825758934021, -0.03129354491829872, -0.0...
ed inspection information; 4. Methods and means necessary for energy isolation and control; 5. The local procedures for requesting approval for using LO/TO procedures; and 6. How to verif...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.395
0.802
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:42.641151
[ -0.06887053698301315, 0.10107716917991638, 0.060183197259902954, -0.0010618228698149323, 0.03198934718966484, -0.012788334861397743, 0.01753067970275879, -0.04260464757680893, -0.0685705617070198, -0.0023544037248939276, 0.004251827951520681, 0.029900487512350082, -0.036415260285139084, -0...
will be conducted whenever a post-evaluation reveals, or the responsible OSHA Manager(s) has reason to believe, that LO/TO procedures are not being used properly or that the appropriate skills need refreshed. IX. Recordkeeping The applicable OSHA RA/Directorate Directo...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.635
0.658
["management", "philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:42.707115
[ -0.06267832964658737, 0.06737644225358963, -0.06124652177095413, 0.0417906828224659, 0.04987366870045662, -0.051277272403240204, -0.014500712044537067, -0.005207023583352566, -0.010584165342152119, -0.014534324407577515, -0.022403277456760406, 0.014083495363593102, 0.022986380383372307, 0....
2. Maintain documentation for lockout device issuance. A suggested format for pre-application checklist and post-application evaluation is enclosed in Chapter 13, Appendix A. 13-37 ...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.597
0.808
["resume", "philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:42.772986
[ -0.047077517956495285, 0.11886785924434662, -0.029737668111920357, 0.017989253625273705, 0.037000346928834915, 0.007812624797224998, 0.02518274635076523, 0.04032422974705696, -0.030965059995651245, 0.046277619898319244, 0.03999961167573929, 0.06757799535989761, 0.005545356310904026, -0.068...
Section APPENDIX A: CONTROL OF HAZARDOUS ENERGY SOURCES PRE-REQUEST] * OSHA ARCHIVE DOCUMENT * NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy. APPENDIX A: CONTROL OF HAZARDOUS ENERGY SOURCES PRE-REQUEST FOR APPROVAL CHECKL...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.456
0.816
["resume"]
512
OSHA Test
topic
2026-09-23T02:22:42.838650
[ -0.04189906641840935, 0.10096297413110733, -0.00459659518674016, 0.05587423965334892, 0.07029935717582703, -0.032771218568086624, 0.00887669250369072, 0.005052767228335142, -0.05887187272310257, 0.025616712868213654, -0.01470759604126215, 0.029847364872694016, 0.0006502237520180643, -0.069...
to implement lockout/tagout (LO/TO) procedures:  Have you explored all alternative methods for obtaining the information without needing to lock out hazardous energy? Yes No  Does the employer have an effective LO/TO program? Yes No Note: Review the employer’s LO/TO program to m...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.56
0.846
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:42.904427
[ -0.06695316731929779, 0.10714025050401688, -0.05110829696059227, 0.00629710266366601, 0.04382708668708801, 0.013747491873800755, -0.0001932685700012371, -0.03061291016638279, -0.07208498567342758, -0.04474186897277832, -0.009772740304470062, 0.054241716861724854, -0.016068236902356148, -0....
Note: Obtain a copy and review the employer’s specific procedures to make sure they have addressed all hazardous energy associated with the machine.  Does the employer have the correct lockout devices for use on the energy isolating device? Yes No Note: Make sure the emplo...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.557
0.844
["communication", "interview", "war_conflict"]
512
OSHA Test
topic
2026-09-23T02:22:42.970406
[ -0.0726027861237526, 0.11491407454013824, 0.022457122802734375, 0.023912660777568817, 0.022073589265346527, -0.02523096092045307, 0.013032551854848862, -0.07015460729598999, -0.08355257660150528, -0.07347911596298218, 0.09542547166347504, 0.03151301294565201, -0.0204244926571846, -0.070441...
re that the employee is thoroughly familiar with the equipment, its energy sources, and the procedures in place for the purpose of isolation and control? Yes No  Have you informed the employer of OSHA’s LO/TO Program? Yes No  Have you informed your supervisor about your need...
upload://osha_safety
OSHA Test — Joe Tester
uploaded_content
false
0.506
0.854
["philosophy"]
512
OSHA Test
topic
2026-09-23T02:22:43.036529
[ 0.031184924766421318, 0.10523476451635361, 0.05699989199638367, 0.03415708616375923, 0.018378503620624542, -0.06390880793333054, 0.04243772476911545, -0.004709544591605663, -0.09584522992372513, -0.003147088922560215, 0.02151445671916008, -0.0007808931404724717, 0.03324168175458908, -0.020...