text stringlengths 512 512 | source_url stringclasses 1
value | source_title stringclasses 1
value | source_domain stringclasses 1
value | license_type stringclasses 1
value | attribution_required bool 1
class | attribution_text stringclasses 1
value | license_url stringclasses 1
value | relevance_score float64 0.32 0.8 | quality_score float64 0.42 0.87 | topics stringclasses 187
values | character_count int64 512 512 | subject_name stringclasses 1
value | subject_type stringclasses 1
value | extraction_date stringdate 2026-09-23 02:21:56 2026-09-23 02:24:00 | embedding listlengths 384 384 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
and parking lots.
Floor holes and openings will be protected by a cover or standard railing. Should the
cover or railing need to be removed, the floor opening or hole will be constantly
attended by an attendant assigned to warn others of the hazard.
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.432 | 0.822 | ["war_conflict"] | 512 | OSHA Test | topic | 2026-09-23T02:22:36.510418 | [
0.03738464415073395,
0.14185599982738495,
0.03036867268383503,
0.05622461438179016,
0.056174926459789276,
0.036916378885507584,
0.046598296612501144,
-0.011944778263568878,
0.017368284985423088,
0.04740214720368385,
0.03155894577503204,
0.04189823940396309,
-0.04589467868208885,
0.06689046... | |||
resented here as historical content, for research and review purposes only.
[Page 102]
[Section Open-sided floors or platforms that are four or more feet above ground level will be]
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE Document, and may no longer represe... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.575 | 0.842 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:36.576464 | [
0.04451622813940048,
0.09169291704893112,
0.00821500364691019,
0.01653105951845646,
0.044592633843421936,
-0.027939556166529655,
-0.09353918582201004,
0.08627928793430328,
-0.038996633142232895,
0.04086887463927269,
0.001692736055701971,
0.05402403324842453,
-0.012021644040942192,
0.052980... | |||
vided with proper standard railing. When there is equipment that could fall from
these elevations, the installation of a standard toe board is required.
Scaffolds.
There are several different types of scaffolds. Access to elevated locations or work at
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.531 | 0.83 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:36.642166 | [
-0.027156738564372063,
-0.026616087183356285,
0.022843027487397194,
-0.024468516930937767,
-0.019350387156009674,
0.05499356612563133,
0.011077487841248512,
0.07141972333192825,
-0.07858407497406006,
0.0383664071559906,
0.041344236582517624,
0.035799045115709305,
-0.03320922330021858,
0.08... | |||
hat if the work cannot be performed from the ground or
by other available means, the following general requirements for scaffolding will be
met:
1. Scaffolds will be used only when work cannot be performed from the ground
or from s... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.355 | 0.822 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:36.707892 | [
-0.03667531907558441,
-0.0319896936416626,
-0.029967639595270157,
-0.0412331260740757,
0.0075321984477341175,
0.04789968580007553,
-0.06626331806182861,
0.020833011716604233,
-0.043810825794935226,
0.05434432253241539,
-0.01137677300721407,
0.0063571506179869175,
-0.021298913285136223,
0.0... | |||
carrying the intended load without settling or displacement. Unstable
objects, including barrels, boxes, loose bricks or concrete blocks, will not be
used to support scaffolds or planks. The use of base plates and mudsills is
accep... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.369 | 0.822 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:36.773628 | [
-0.028790226206183434,
0.027472060173749924,
-0.029930472373962402,
-0.004306830000132322,
-0.03013397380709648,
0.008946645073592663,
-0.05612029880285263,
0.029637280851602554,
-0.05951577425003052,
0.05288325250148773,
-0.02643626742064953,
0.02098984457552433,
-0.02800452895462513,
0.0... | |||
Never use the side frames to access the scaffold.
4. Scaffolds must be fully planked. The planks will not extend less than six
inches and not more than 18 inches from the end.
5. Scaffolds will not be used during storms, high wind, or wh... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.362 | 0.676 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:36.839458 | [
0.04984687268733978,
-0.017563262954354286,
-0.015761293470859528,
-0.05078046768903732,
0.02136623114347458,
0.055634334683418274,
-0.0642690509557724,
0.06512995064258575,
-0.07829295098781586,
0.04726263880729675,
0.0014739297330379486,
0.0857882872223854,
-0.061964426189661026,
0.05368... | |||
rd guardrails,
toeboards, and will be properly cross-braced.
7. Mobile ladder stands and scaffolds will have positive wheel and/or swivel
lock casters to prevent movement.
11-24
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.539 | 0.802 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:36.905169 | [
-0.05599473789334297,
0.03682814911007881,
-0.04746478423476219,
-0.05560843646526337,
-0.013456186279654503,
0.04205343872308731,
-0.027901312336325645,
0.033453214913606644,
-0.025459473952651024,
0.1319824904203415,
0.07080579549074173,
0.025977391749620438,
0.05678516998887062,
0.03507... | |||
ew purposes only.
[Page 103]
[Section CHAPTER 12. HAZARD COMMUNICATION]
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy.
CHAPTER 12. HAZARD COMMUNICATION
I. Purpose
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.608 | 0.664 | ["communication"] | 512 | OSHA Test | topic | 2026-09-23T02:22:36.971093 | [
-0.02086966671049595,
0.12699845433235168,
-0.007233812939375639,
-0.022568047046661377,
0.10801561176776886,
-0.03258087858557701,
0.011141685768961906,
0.06326515227556229,
-0.04406879097223282,
-0.0032402940560132265,
0.041554518043994904,
-0.0005883978446945548,
0.02713801898062229,
0.... | |||
II. Scope
This program applies to all work operations where there is exposure to hazardous
chemicals that are known to be present in the workplace in such a manner that employees
may be exposed under normal conditions of use or in a foreseeable emergency. The mere
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.452 | 0.846 | ["crisis"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.037133 | [
-0.005724495742470026,
0.06279263645410538,
-0.021573754027485847,
-0.033131279051303864,
0.057307031005620956,
0.026568137109279633,
0.08764515817165375,
0.0603141225874424,
-0.11793964356184006,
-0.05914297327399254,
-0.009476147592067719,
-0.03933635726571083,
0.0705631896853447,
0.0132... | |||
ntial exposure to an employee. Consumer products
are not covered by this program to the extent that the use of the products results in a
duration and frequency of exposure that is not greater than that which could be
reasonably be experienced by consumers.
III. ... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.439 | 0.838 | ["communication", "management", "philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.102918 | [
-0.002129555679857731,
0.04137034714221954,
0.024666830897331238,
0.001021557953208685,
0.04233282431960106,
0.005738983396440744,
0.05026176944375038,
0.04689273610711098,
-0.038866106420755386,
-0.033283937722444534,
0.01519762072712183,
-0.040038663893938065,
0.02378121018409729,
-0.033... | |||
Program (HCP) in his or her office, acting as the representative of
the Regional Administrator.
1. He or she may delegate the day-to-day responsibility for the HCP to one of
the Assistant Area Directors or a senior industrial hygienist.
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.555 | 0.818 | ["crisis"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.168903 | [
0.0033907010219991207,
0.08966444432735443,
0.028283515945076942,
-0.03163281828165054,
-0.04309234395623207,
0.05613984167575836,
0.006332598626613617,
0.03865968436002731,
-0.09947390109300613,
-0.023979172110557556,
-0.04273093864321709,
-0.05683569237589836,
0.0196576789021492,
-0.0100... | |||
remains with the responsible OSHA
Manager(s).
Regional Offices – the Regional Hazard Communication Coordinator (RHCC), acting
as the representative of the Regional Administrator, will have responsibility for the
development and implementa... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.597 | 0.814 | ["communication", "management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.234957 | [
-0.004942081868648529,
-0.0006524711498059332,
-0.04555674269795418,
0.06657059490680695,
0.020960960537195206,
-0.019237875938415527,
-0.023111358284950256,
0.035492125898599625,
-0.04646002873778343,
-0.00450357049703598,
-0.030622607097029686,
-0.02707241103053093,
-0.024189690127968788,
... | |||
ogram, the
responsible OSHA Manager(s) and RHCC have the same responsibilities.
IV. Procedure
List of Hazardous Chemicals
12-25
* OSHA ARCHIVE DOCUMENT *
NOTICE: This document i... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.599 | 0.8 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.300900 | [
-0.02360369823873043,
0.013247722759842873,
-0.07035255432128906,
-0.014012289233505726,
0.07289724051952362,
-0.037222787737846375,
-0.044036298990249634,
0.14363931119441986,
-0.08368309587240219,
-0.0024681894574314356,
-0.021840477362275124,
-0.008758817799389362,
-0.009037821553647518,
... | |||
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy.
1. A list will be maintained of all hazardous chemicals used in the office and
updated as necessary. This list will be developed by each... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.623 | 0.836 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.366852 | [
-0.03843246027827263,
0.05816091224551201,
-0.014353550970554352,
0.01879311166703701,
0.1398557424545288,
0.0046320753172039986,
0.017266836017370224,
0.07172341644763947,
-0.07912969589233398,
0.031173035502433777,
0.015544968657195568,
0.0627848282456398,
0.011461110785603523,
-0.008010... | |||
corresponding Safety Data Sheet (SDS) for each
chemical.
Safety Data Sheet
1. A copy of an SDS for every substance on the list of hazardous chemicals in
the Regional/Area office will be maintained.
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.547 | 0.66 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.433186 | [
0.022387558594346046,
-0.040672726929187775,
-0.045425526797771454,
-0.026818543672561646,
0.1030837669968605,
0.09001044183969498,
0.024414628744125366,
0.09129555523395538,
-0.0040753730572760105,
0.005173243582248688,
-0.008702143095433712,
0.008963724598288536,
0.020439641550183296,
-0... | |||
at all times.
3. Requisitions for hazardous chemicals are to include a request for the SDS.
All SDSs will be reviewed for content and completeness. Additional research
will be done if necessary.
4. SDSs of new... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.439 | 0.67 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.499020 | [
-0.022971130907535553,
0.00541488965973258,
-0.023886099457740784,
-0.003742197761312127,
0.08637329190969467,
0.02274361252784729,
0.023008760064840317,
0.07546361535787582,
-0.04191380739212036,
-0.0042517888359725475,
-0.004589592106640339,
-0.026259426027536392,
0.020052524283528328,
0... | |||
or his or her
designee. Whenever possible, the least hazardous substance will be obtained.
Warning Labels
1. All containers of hazardous chemicals in the office will be properly labeled.
2. All labels will include the id... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.368 | 0.664 | ["war_conflict"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.564816 | [
0.04088409245014191,
0.06500852853059769,
-0.03728094696998596,
-0.007998230867087841,
0.06498104333877563,
0.05997132509946823,
0.11873485147953033,
0.08465695381164551,
-0.004534910432994366,
-0.0636555552482605,
0.029968127608299255,
-0.09295546263456345,
0.04100754112005234,
0.04282354... | |||
3. Each label will be checked with the corresponding SDS to verify the
information.
4. Alternate labeling provisions, such as tags or markings, may be made for
containers that are of unusual shape or size and do not eas... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.335 | 0.662 | ["strategy", "philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.630729 | [
-0.002653610659763217,
0.0024317693896591663,
-0.07717784494161606,
-0.01886836439371109,
0.13500192761421204,
0.010315252467989922,
0.0989457368850708,
0.06307822465896606,
0.01841227151453495,
-0.08072888106107712,
0.1098693385720253,
-0.03590725362300873,
0.018155168741941452,
0.0171015... | |||
beled container to a portable
container, and that are intended only for the immediate use of the person who
performs the transfer are not required to be labeled. Immediate use is defined
in 29 CFR 1910.1200.
Training
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.56 | 0.808 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.696638 | [
-0.03650446981191635,
0.08238145709037781,
-0.04651336371898651,
0.043363697826862335,
0.053416673094034195,
-0.031708113849163055,
0.07795077562332153,
0.015356911346316338,
-0.05136454477906227,
-0.06140924617648125,
0.08580269664525986,
0.018961716443300247,
-0.03204623982310295,
0.0423... | |||
ent is presented here as historical content, for research and review purposes only.
[Page 105]
[Section Hazardous Chemicals Encountered on Work Sites]
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy.
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.618 | 0.822 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.762444 | [
-0.018021192401647568,
0.06629543751478195,
0.024113884195685387,
-0.007569097448140383,
0.10523020476102829,
-0.025307318195700645,
0.04083254560828209,
0.09353425353765488,
-0.14840227365493774,
-0.0027944804169237614,
0.0058748372830450535,
0.010839929804205894,
0.030610157176852226,
0.... | |||
in this Chapter.
2. New employees will receive training on the contents of this program and
specific training on the chemicals that the individuals will be directly
working with during orientation and prior to performing work where
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.557 | 0.808 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.828309 | [
-0.013829982839524746,
-0.017877699807286263,
0.018264442682266235,
-0.002753954380750656,
0.03653227165341377,
0.10044735670089722,
0.07368249446153641,
0.03817003592848778,
-0.12052827328443527,
-0.08759081363677979,
0.034039512276649475,
0.018824327737092972,
-0.01811538264155388,
0.026... | |||
l
is introduced into their work area.
4. As warranted, training may be provided based on the uniqueness of the
hazards to be encountered at an inspection worksite.
5. The training program will emphasize the... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.385 | 0.656 | ["war_conflict"] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.893980 | [
-0.016875939443707466,
0.0014624278992414474,
0.038480646908283234,
-0.005519948434084654,
0.06630750745534897,
0.0911044180393219,
0.019114455208182335,
0.07574339956045151,
-0.10865806043148041,
-0.03460187837481499,
-0.0009753723279573023,
-0.0014778710901737213,
0.06786089390516281,
-0... | |||
. Hazardous chemical properties, including visual appearance and odor,
and methods that can be used to detect the presence or release of
hazardous chemicals;
c. Physical and health hazards associated with potential exposu... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.429 | 0.792 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:37.959785 | [
0.0344710536301136,
0.0007777675054967403,
0.00511584896594286,
0.0009430752834305167,
0.039934806525707245,
0.047146063297986984,
0.06793220341205597,
0.0620807521045208,
-0.04150380939245224,
0.014581606723368168,
0.03249737620353699,
-0.12580497562885284,
0.015186840668320656,
0.0532509... | |||
personal protective
equipment, work practices, and emergency procedures;
e. Hazardous chemical spill and leak procedures; and
f. Location of SDSs, how to understand their content, and how
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.59 | 0.792 | ["crisis", "philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.025681 | [
0.029775748029351234,
0.0018819310935214162,
0.00871442724019289,
-0.018103102222085,
0.08191309124231339,
0.06612975150346756,
0.09357927739620209,
0.11102018505334854,
-0.06549937278032303,
-0.015135576948523521,
-0.016761133447289467,
-0.005704658105969429,
-0.003011693013831973,
0.0197... | |||
Recognizing that the greatest potential for exposure to hazardous chemicals involves
field exposures during the course of on-site activities, the following issues will be
considered:
1. Field employees will identify potential hazards usin... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.578 | 0.802 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.091508 | [
0.04069346934556961,
0.045679520815610886,
0.016183767467737198,
-0.042426515370607376,
0.11231066286563873,
0.0432903952896595,
0.09258202463388443,
0.08881229162216187,
-0.09091395139694214,
-0.012465287931263447,
-0.03475575894117355,
-0.056927524507045746,
0.023093631491065025,
0.09272... | |||
a. Ensure that appropriate protective measures, including personal
protective equipment, are available and utilized.
b. Where protective measures are not adequate, OSHA employees must
avoid exposure and contact th... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.488 | 0.63 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.157202 | [
0.0002835657214745879,
0.0736984834074974,
0.025548690930008888,
0.039487551897764206,
0.06395449489355087,
-0.014788406901061535,
0.017095550894737244,
0.03249333053827286,
-0.05356257036328316,
0.028453659266233444,
0.08075504004955292,
-0.06282998621463776,
0.03895210474729538,
0.040285... | |||
* OSHA ARCHIVE DOCUMENT *
NOTICE: This document is presented here as historical content, for research and review purposes only.
[Page 106]
[Section Contract Employees]
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE Document, and may no longer re... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.646 | 0.826 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.223147 | [
-0.04540511965751648,
0.12580174207687378,
0.020564734935760498,
0.051329080015420914,
0.0823516771197319,
-0.015702582895755768,
-0.014667247422039509,
0.007528487592935562,
-0.06539729982614517,
0.03206197917461395,
0.0039968062192201614,
0.09083617478609085,
0.02434450574219227,
0.03091... | |||
hazard to OSHA employees will be handled in accordance with procedures
outlined by OSHA’s Salt Lake City Technical Center.
Contract Employees
1. Outside contractors will be advised of any chemical hazards that may be
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.629 | 0.816 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.289192 | [
-0.032366249710321426,
0.07575590163469315,
0.036253225058317184,
-0.015968047082424164,
0.06000460684299469,
-0.014926345087587833,
0.041374627500772476,
0.034003350883722305,
-0.04984118789434433,
0.00969413947314024,
-0.00097817147616297,
-0.01865706965327263,
0.0819239690899849,
0.0556... | |||
f the location and availability of SDSs.
3. Each contractor bringing chemicals on-site must provide OSHA with the
appropriate hazard information, including SDSs. All containers of hazardous
chemicals brought on-site by an outside contractor... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.444 | 0.804 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.355295 | [
0.04744267836213112,
0.009602032601833344,
-0.013064809143543243,
-0.013731556944549084,
0.09395875036716461,
0.02846634015440941,
0.013872603885829449,
0.051086850464344025,
-0.0517316497862339,
-0.03691805899143219,
-0.007055668625980616,
-0.01683766022324562,
0.032089099287986755,
0.025... | |||
k is planned in an OSHA office, affected employees must be
informed of any chemical hazards associated with the performance of the task(s) and
appropriate protective measures before such work is initiated.
CHAPTER 13. CONTROL OF HAZARDOUS ENERGY SOURCES
I. ... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.498 | 0.824 | ["philosophy", "management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.420877 | [
0.03164076432585716,
0.11639845371246338,
-0.023719634860754013,
0.03130972012877464,
0.05386049672961235,
-0.006397734861820936,
0.05488645285367966,
0.0037119388580322266,
-0.04008273780345917,
0.025821702554821968,
-0.002356460317969322,
0.025569293648004532,
0.06107685714960098,
-0.065... | |||
ut (LO/TO) Program. The policies and procedures in
this Program are intended to set broad expectations for preventing OSHA employee
injury or death from uncontrolled hazardous energy sources when there are no
alternatives to conducting work activities where energy isol... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.613 | 0.826 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.486630 | [
-0.05388762056827545,
0.045909710228443146,
0.04277201369404793,
-0.024521604180336,
0.007397731300443411,
-0.0424024760723114,
0.036380089819431305,
0.015243597328662872,
-0.02305031381547451,
-0.016078751534223557,
-0.003275175578892231,
-0.007725408300757408,
0.09408549964427948,
0.0398... | |||
as needed.
This Program is designed to protect OSHA employees from the inadvertent or unintended
release of energy, movement, or flow in electrical potential, mechanical, or material
systems, which could result in an injury or fatality to outside personnel as defined in 29... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.653 | 0.834 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.552495 | [
-0.07178183645009995,
0.1327786147594452,
-0.0023950019385665655,
0.01008228212594986,
0.0767454206943512,
-0.028413791209459305,
0.013332200236618519,
0.044844068586826324,
-0.06716545671224594,
0.006516100373119116,
0.011613385751843452,
0.025444546714425087,
0.059716444462537766,
-0.010... | |||
lly hazardous energy from machines or equipment is
isolated using lockout devices before OSHA employees perform any activities (e.g.,
inspections) where unexpected energizing, start up, or release of stored energy could
cause an injury or a fatality.
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.602 | 0.814 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.618226 | [
-0.02880128100514412,
0.07369989156723022,
-0.008838605135679245,
0.029966864734888077,
0.08809517323970795,
-0.016823124140501022,
-0.013600391335785389,
0.01865130476653576,
-0.00661444989964366,
-0.006106906104832888,
0.03950975090265274,
0.10546009242534637,
0.06193458288908005,
-0.022... | |||
as historical content, for research and review purposes only.
[Page 107]
[Section Scope]
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy.
All OSHA employees are considered affected employees becaus... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.481 | 0.834 | ["career", "philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.684138 | [
-0.03716179355978966,
0.08495525270700455,
0.026058882474899292,
0.051781702786684036,
0.0792192593216896,
-0.023851845413446426,
-0.012474234215915203,
-0.06338559836149216,
-0.09514858573675156,
0.016891619190573692,
0.06133414804935455,
0.11278211325407028,
0.020481865853071213,
-0.0126... | |||
s being performed. For the rare occasion when lockout devices are determined necessary,
management will determine if and when a limited number of OSHA employees are
considered authorized employees. If Directorate Directors, Regional Administrators
(RA), and Area Directors (AD)... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.618 | 0.822 | ["strategy", "management", "decision_making", "philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.750086 | [
-0.0007598027004860342,
0.027677446603775024,
-0.01987091824412346,
0.058394044637680054,
0.07121390104293823,
0.017063766717910767,
0.0569075308740139,
-0.07680172473192215,
-0.004593343939632177,
0.006145486142486334,
0.06165138632059097,
0.08204301446676254,
0.013697042129933834,
-0.003... | |||
for affected
employees in this program apply to that Region/Directorate.
This Program assumes that OSHA is the outside employer and authorized OSHA
employees may conduct work activities as outside personnel. Normally, OSHA
employees are not expected to put themse... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.48 | 0.82 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.816322 | [
0.01566123217344284,
0.07663349062204361,
0.046024322509765625,
0.03423088416457176,
0.05593876540660858,
-0.07591740041971207,
0.024133965373039246,
-0.03442427143454552,
-0.06872117519378662,
-0.022131675854325294,
0.03951486572623253,
-0.007031399291008711,
-0.0016140941297635436,
0.000... | |||
nts or
visually inspecting equipment at an on-site employer’s worksite is considered
maintenance or servicing. LO/TO program requirements apply if there is a potential for
the unexpected energizing, start up or release of stored energy that could cause injury.
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.604 | 0.828 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.882094 | [
-0.09707541018724442,
0.05821653828024864,
0.003496284829452634,
0.02428530715405941,
0.07261154800653458,
-0.04337521269917488,
0.05451783165335655,
-0.019902044907212257,
-0.06871688365936279,
-0.029693670570850372,
-0.08516094833612442,
0.02963912859559059,
-0.028168322518467903,
-0.021... | |||
-site employer about OSHA’s LO/TO procedures
as required in 29 CFR 1910.147(f)(2)(i) (see section V.C.1).
This Program relies on an effective on-site employer LO/TO Program and OSHA
employee’s ability to assess its effectiveness during the required information sharing
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.63 | 0.826 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:38.947900 | [
-0.03891974315047264,
0.06366655975580215,
-0.005158007610589266,
0.04118683934211731,
0.06344116479158401,
-0.05337744578719139,
0.018029728904366493,
0.008035841397941113,
-0.08835471421480179,
-0.04907606169581413,
-0.011541346088051796,
0.017214138060808182,
0.01821134425699711,
0.0277... | |||
tside personnel if there is not an effective on-site
employer LO/TO Program.
II. Scope
This LO/TO Program is intended to apply specifically to OSHA employees covered by
the OSHA Field Safety and Health Manual—specifically OSHA employees conducting
w... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.455 | 0.82 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.013694 | [
-0.03483250364661217,
-0.007846944034099579,
-0.05284745618700981,
0.015280364081263542,
0.07327696681022644,
-0.016034577041864395,
0.06941062957048416,
0.010407340712845325,
-0.06341857463121414,
-0.042757052928209305,
0.005872811656445265,
0.03471988067030907,
0.0005058083334006369,
0.0... | |||
referred to as the on-site employer as established
in 29 CFR 1910.147(f)(2)(i).
The procedures in this program do not provide OSHA-owned equipment-specific LO/TO
procedures required by 29 CFR 1910.147 for equipment at OSHA facilities.
Regions/Directorates that ... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.443 | 0.814 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.079582 | [
-0.061309151351451874,
0.05621965974569321,
-0.03801971301436424,
0.0059012770652771,
0.05512816458940506,
-0.0820692926645279,
-0.01833905093371868,
0.027955075725913048,
-0.06624976545572281,
-0.07387706637382507,
0.03697441518306732,
-0.019504517316818237,
0.043088458478450775,
0.026787... | |||
-owned
equipment that is consistent with, and at least as protective as, 29 CFR 1910.147. The
RA/Directorate Director will provide information about LO/TO procedures to personnel
servicing OSHA equipment as the on-site employer and will ensure that they are
inf... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.458 | 0.83 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.145314 | [
-0.08606838434934616,
0.046014267951250076,
-0.04283152520656586,
0.034475769847631454,
0.06583454459905624,
-0.08934889733791351,
0.028286732733249664,
0.043824952095746994,
-0.0491781085729599,
-0.026939721778035164,
0.003893983783200383,
0.053371984511613846,
0.07066763937473297,
0.0149... | |||
vered in
Chapter 6, Office Safety and Health. When there is a potential for exposure to energized
parts, Chapter 22, Electrical Safety provides necessary procedures for electrical hazard
recognition and avoidance.
13-29
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.608 | 0.812 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.210997 | [
-0.01673649437725544,
0.06400194764137268,
0.0666121393442154,
0.0017452145693823695,
0.12136510759592056,
-0.02742641605436802,
0.021586989983916283,
0.08218072354793549,
-0.060410548001527786,
0.02100958675146103,
0.026111697778105736,
0.021888386458158493,
0.05182778090238571,
0.0405178... | |||
review purposes only.
[Page 108]
[Section III.]
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy.
III. References
29 Code of Federal Regulations Section 1910.147, The Control of Haz... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.604 | 0.666 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.276877 | [
-0.06241131201386452,
0.06646598130464554,
-0.02456367015838623,
0.062199175357818604,
0.07680065184831619,
-0.0009330473840236664,
-0.06391233950853348,
0.05116240307688713,
-0.06113538518548012,
0.018969926983118057,
0.026555845513939857,
0.08581019192934036,
0.01187124103307724,
-0.0365... | |||
29 CFR 1926, Subpart V, Electrical Power Transmission and Distribution
CPL 02-00-147, The Control of Hazardous Energy, Enforcement Policy and
Inspection Procedures, dated February 11, 2008
OSHA Field Safety and Health Manual, Chapter 6, Office Safety and Health
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.645 | 0.826 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.343039 | [
-0.010760313831269741,
0.06950659304857254,
0.05778999254107475,
0.08127370476722717,
0.06299743801355362,
-0.021353397518396378,
-0.0106633510440588,
0.03375096991658211,
-0.05499725788831711,
-0.019201628863811493,
0.04881707951426506,
0.011662716045975685,
0.03374050557613373,
0.0146609... | |||
OSHA employee that may conduct activities in an
area in which LO/TO procedures are being used. All OSHA employees are
potentially affected employees since they may encounter LO/TO devices at an OSHA
facility or at another employer’s worksite.
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.487 | 0.826 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.409017 | [
-0.0033786713611334562,
0.06010536104440689,
-0.004679733421653509,
0.025778332725167274,
0.048747021704912186,
-0.07765206694602966,
0.09413785487413406,
-0.07073909789323807,
-0.03589525446295738,
-0.00504706334322691,
0.019350165501236916,
0.04398859664797783,
0.014643942937254906,
0.03... | |||
nee to use a lockout device.
Authorized OSHA Employees will use a lock only in a group lockout that includes
the on-site employer’s primary authorized employee in order to perform inspection
activity on a machine or piece of equipment.
Energy Is... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.47 | 0.826 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.475117 | [
-0.1291486620903015,
0.09655129164457321,
-0.0460377037525177,
0.028746072202920914,
0.06475399434566498,
-0.005558142438530922,
0.11080864816904068,
-0.04332796484231949,
0.04132404550909996,
-0.02117970958352089,
0.07051011919975281,
0.06901507824659348,
0.02253452129662037,
-0.066121697... | |||
ited to manually operated
circuit breakers, disconnect switches, line valves, a block and any similar devices.
Push buttons, selector switches and other control circuits are not acceptable as energy
isolating devices.
Lockout Device is a devic... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.373 | 0.83 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.541123 | [
-0.05934678763151169,
0.07949575036764145,
-0.04243794083595276,
0.031344763934612274,
-0.014795562252402306,
0.05468624830245972,
0.09480910748243332,
-0.013528132811188698,
0.029601851478219032,
0.06346528232097626,
0.09463222324848175,
0.04584117978811264,
-0.01710432767868042,
-0.04856... | |||
d prevent the
energizing of a machine or equipment (e.g. blank flanges and bolted slip blinds).
Each lockout device will be supplied with a tag that meets the requirements of 29
CFR 1910.147, is intended for use in group lockout, and includes a tag that identifies
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.381 | 0.846 | ["resume", "war_conflict"] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.607025 | [
-0.08359930664300919,
0.051329586654901505,
-0.08155208826065063,
-0.037948720157146454,
0.05211428552865982,
0.03982176259160042,
0.03479314222931862,
0.026189275085926056,
0.04943111911416054,
-0.06172323599457741,
0.12187027931213379,
0.028013309463858604,
0.012351365759968758,
-0.02858... | |||
of
attachment, that can be securely fastened to an energy isolating device in accordance
with an established procedure to indicate that the energy isolating device and the
equipment being controlled may not be operated until the tagout device is removed.
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.563 | 0.818 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.673061 | [
-0.03667590767145157,
0.15955446660518646,
-0.025452814996242523,
0.07052317261695862,
0.0343206524848938,
-0.08120741695165634,
0.05614291504025459,
-0.007685608230531216,
0.009257268160581589,
-0.0030842225532978773,
0.12518814206123352,
0.09652184695005417,
0.015225347131490707,
0.00905... | |||
ted here as historical content, for research and review purposes only.
[Page 109]
[Section Responsibilities]
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy.
For this Program, only lockout device... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.602 | 0.822 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.739025 | [
-0.10134061425924301,
0.09130044281482697,
-0.03712897375226021,
0.06017907336354256,
0.05574500933289528,
0.008511661551892757,
-0.007281516678631306,
0.005693196319043636,
-0.057184331119060516,
0.043130744248628616,
0.01263565756380558,
0.07737140357494354,
0.0053255436941981316,
-0.023... | |||
RAs/Directorate Directors and Area Office Directors/equivalents or designees will:
1. Decide if employees are authorized to conduct work activities that require
LO/TO procedures on rare occasions when no alternatives are available.
2. P... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.605 | 0.654 | ["decision_making"] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.805024 | [
-0.07796303182840347,
-0.008609702810645103,
-0.012909088283777237,
0.03870625048875809,
0.025363145396113396,
-0.028175417333841324,
0.04179096966981888,
-0.04212455078959465,
-0.0438593327999115,
-0.027329109609127045,
-0.019839806482195854,
0.006746819708496332,
0.0037703511770814657,
0... | |||
3. Request assistance from SLTC’s Health Response Team (HRT) when
investigations and inspections require hazardous energy isolation and the
Region or Directorate does not have the resources to safely implement
LO/TO procedures.
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.624 | 0.806 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.870882 | [
-0.07903576642274857,
0.09874381124973297,
0.01881950907409191,
0.041261348873376846,
0.07930956780910492,
-0.09195426106452942,
-0.024907661601901054,
0.08004028350114822,
-0.08181732892990112,
-0.039272259920835495,
0.05164080858230591,
-0.02242361381649971,
0.03480221703648567,
-0.02509... | |||
ent in which the unexpected energization
or startup of the machines or equipment, or release of stored energy could
harm OSHA employees or outside servicing personnel. Determine if
authorized OSHA employees are expected to isolate hazardous ene... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.644 | 0.81 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:39.936914 | [
-0.03709208220243454,
0.10355104506015778,
0.018467025831341743,
0.029036780819296837,
0.09667979925870895,
-0.07089832425117493,
0.07650619745254517,
0.04088398069143295,
-0.051163945347070694,
0.014092456549406052,
0.01785588078200817,
0.003997063729912043,
0.03432587534189224,
-0.004586... | |||
rmation about LO/TO procedures to outside personnel servicing
OSHA equipment and share information about the servicing personnel’s
LO/TO procedures before work begins (29 CFR 1910.147(f)(2)).
If RAs, Directorate Directors, Area Office Directors or designees d... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.483 | 0.806 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.002664 | [
-0.060605958104133606,
0.050389014184474945,
-0.03137983754277229,
-0.005735666491091251,
0.029853366315364838,
-0.0454917848110199,
0.049973830580711365,
-0.021301323547959328,
-0.01160414982587099,
0.004461021162569523,
0.04270101338624954,
0.07292594015598297,
0.04646340385079384,
-0.01... | |||
must:
1. Develop local procedures for LO/TO program implementation to supplement
this Program.
2. Select employees who are authorized to implement LO/TO procedures in this
Program and that have the knowledge... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.433 | 0.8 | ["resume", "education"] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.068492 | [
-0.003262741956859827,
0.06402834504842758,
0.028899922966957092,
-0.03602883592247963,
-0.012646974064409733,
-0.018063457682728767,
0.02490045316517353,
0.025802411139011383,
-0.10999801754951477,
-0.03035498782992363,
-0.016457879915833473,
-0.0311427004635334,
0.038409292697906494,
0.0... | |||
that selected authorized OSHA employees understand the purpose of the
LO/TO program and, at a minimum:
a. Can recognize hazardous energy sources;
b. Will represent this chapter and local procedures as OS... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.632 | 0.796 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.134599 | [
-0.03149637207388878,
0.08284039795398712,
0.004695007111877203,
-0.009300803765654564,
0.07253117114305496,
-0.042315490543842316,
0.06840627640485764,
-0.006480682175606489,
-0.07755520939826965,
-0.06136780604720116,
-0.04477559030056,
-0.004584844224154949,
0.036919210106134415,
0.0124... | |||
CFR 1910.147(f)(2)(i);
13-31
* OSHA ARCHIVE DOCUMENT *
NOTICE: This document is presented here as historical content, for research and review purposes only.
[Page 110]
* OSHA ARCHIVE DOCUME... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.633 | 0.808 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.200355 | [
-0.07615956664085388,
0.08775203675031662,
-0.020056545734405518,
0.05226766690611839,
0.10089781880378723,
-0.013713099993765354,
-0.07082025706768036,
0.02673758566379547,
-0.08380256593227386,
-0.00425378093495965,
0.01740691438317299,
0.054970040917396545,
0.0052932570688426495,
0.0093... | |||
ify the on-site employers LO/TO program and procedures are
effective (e.g. interviews and contacting equipment manufacturers);
d. Know the importance of considering alternative methods and how to
identify them for ... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.568 | 0.646 | ["interview"] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.266379 | [
-0.038021743297576904,
0.05412331223487854,
-0.01701807603240013,
-0.021626658737659454,
0.044449206441640854,
0.004958073142915964,
0.034339722245931625,
0.09409935027360916,
-0.11295172572135925,
-0.04696012660861015,
-0.03935100883245468,
0.008543452247977257,
-0.002308269962668419,
0.0... | |||
this
Program; and
f. Voluntarily accept assigned tasks and is willing to perform authorized
OSHA employees responsibilities. Should safety concerns arise when
locking out equipment or machines... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.482 | 0.796 | ["management", "philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.332465 | [
-0.03133241832256317,
0.09353477507829666,
-0.05806927755475044,
-0.008106952533125877,
0.05206457898020744,
0.0020392497535794973,
0.06899236142635345,
0.013920956291258335,
-0.08097969740629196,
0.00807485356926918,
0.01642073690891266,
0.040919579565525055,
0.010970334522426128,
-0.0024... | |||
employer and OSHA management from a safe location.
3. Issue each Authorized OSHA Employee a lockout device with a key. The
lockout device type should be standardized within each Office and in
compliance with 29 CFR 1910... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.494 | 0.662 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.398582 | [
-0.01296939142048359,
0.038966964930295944,
-0.030526436865329742,
-0.01644180528819561,
0.02194310538470745,
0.04573105275630951,
0.025914784520864487,
-0.046294812113046646,
-0.026946304365992546,
-0.010581105016171932,
0.06895487755537033,
0.049644164741039276,
-0.010717247612774372,
0.... | |||
4. Determine if authorized OSHA employees will maintain their lockout
devices or if all lockout devices will be maintained in a central location until
they are needed for approved LO/TO procedures. Include specifics in the
local LO... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.605 | 0.826 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.464381 | [
0.00374599639326334,
0.05179717019200325,
0.026992352679371834,
-0.023786284029483795,
0.04161861538887024,
0.0165614765137434,
0.040870070457458496,
-0.06431224942207336,
-0.015183981508016586,
0.0013845765497535467,
0.06172145903110504,
0.061285898089408875,
-0.002508495468646288,
-0.060... | |||
key will be only used with the Area Office Director/designee’s approval.
The spare key may be provided to the authorized OSHA employee if they
misplace their key or may be used to remove the lock from an energy isolated
device in accordance wi... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.398 | 0.822 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.530033 | [
-0.08952455222606659,
0.07546737790107727,
0.00622242596000433,
-0.03134528174996376,
0.0479712076485157,
-0.023938916623592377,
0.05525936186313629,
0.005701512098312378,
0.050719209015369415,
0.002209265483543277,
0.06932604312896729,
0.08011454343795776,
0.04631613567471504,
-0.09361010... | |||
the following:
a. Are alternative methods a better option to obtain necessary
information?
b. Is the information critical to the inspection?
c. Is the on-s... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.618 | 0.63 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.595947 | [
-0.01953766867518425,
0.15914314985275269,
0.010411267168819904,
0.007311141584068537,
0.07850047200918198,
-0.01248941384255886,
0.0009927010396495461,
0.04903646931052208,
-0.1036100760102272,
0.011778261512517929,
-0.01327386312186718,
0.048347607254981995,
-0.04902006685733795,
-0.0452... | |||
A ARCHIVE DOCUMENT *
NOTICE: This document is presented here as historical content, for research and review purposes only.
[Page 111]
[Section OSHA employees are responsible for following this Program and Region or]
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE D... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.644 | 0.832 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.661719 | [
-0.02529362216591835,
0.15373589098453522,
0.0092317508533597,
0.032663993537425995,
0.06368786096572876,
-0.024304110556840897,
-0.030737614259123802,
-0.006097668781876564,
-0.06666884571313858,
0.006850040517747402,
-0.0009589568362571299,
0.07563989609479904,
0.006866956129670143,
0.01... | |||
yee who used
LO/TO procedures following each approved lock application. OSHA
regulation 29 CFR 1910.147(c)(6) requires periodic inspections of the
LO/TO procedure(s) at least annually. Post-use evaluations, conducted
following e... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.586 | 0.796 | ["resume"] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.727938 | [
-0.10627762228250504,
0.03803745657205582,
0.013458535075187683,
-0.008817854337394238,
0.059428926557302475,
-0.055684857070446014,
0.02425057254731655,
-0.021157948300242424,
0.021066749468445778,
-0.016231242567300797,
0.03756050392985344,
0.03889214247465134,
-0.0011372871231287718,
-0... | |||
y Sources Pre-Request
for Approval Checklist and Post-Application Evaluation).
OSHA employees are responsible for following this Program and Region or
Directorate specific procedures. OSHA employees designated as authorized by their
direc... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.64 | 0.806 | ["resume"] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.793830 | [
0.00888116005808115,
0.05427199974656105,
0.006204035598784685,
0.05017276853322983,
0.10035153478384018,
-0.06517428904771805,
0.020453978329896927,
-0.02658911980688572,
-0.03401460498571396,
-0.002919580787420273,
0.004867299925535917,
0.007463823072612286,
-0.02723626047372818,
0.02256... | |||
zardous energy will:
1. Obtain information about the on-site employer’s LO/TO program and
provide the on-site employer with the following OSHA LO/TO Program
description orally or in writing to meet requirements in 29 CFR
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.591 | 0.648 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.859718 | [
-0.07988792657852173,
0.07863451540470123,
-0.06744340062141418,
0.02072877250611782,
0.059046920388936996,
-0.07289816439151764,
0.05403571575880051,
0.04576139897108078,
-0.06559818983078003,
-0.09009873121976852,
-0.013708683662116528,
-0.0113821467384696,
0.0049920352175831795,
0.00689... | |||
a. All OSHA employees are considered affected employees.
b. A limited number of OSHA employees are authorized employees and
allowed, only under specific scenarios, to use a lockout device as
outside pe... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.642 | 0.642 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.925548 | [
0.030083859339356422,
0.04686632379889488,
0.033481352031230927,
0.02523917704820633,
0.06047920137643814,
-0.016792641952633858,
0.04945893958210945,
-0.0771050900220871,
-0.03645744174718857,
-0.008708209730684757,
0.0529802180826664,
0.055743757635354996,
0.011327171698212624,
-0.011115... | |||
c. Authorized OSHA employees will verify that the on-site employer
LO/TO program is effective before proceeding with local OSHA
management approval processes.
d. Authorized OSHA employees will never have the only... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.621 | 0.806 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:40.991193 | [
-0.043987832963466644,
0.06969320774078369,
0.013786480762064457,
0.026825716719031334,
0.07482754439115524,
-0.027972344309091568,
0.0404670313000679,
-0.06735819578170776,
-0.020587479695677757,
-0.012717616744339466,
0.028282364830374718,
0.06823091208934784,
0.00034008975489996374,
-0.... | |||
group lockout that includes at least one on-site authorized employee.
e. At any time, the on-site employer, OSHA employee or their
management may cancel any activity if it is determined unsafe.
13-33
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.588 | 0.812 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.057123 | [
-0.02708423137664795,
0.07416674494743347,
-0.03720593824982643,
0.031573984771966934,
0.06606263667345047,
0.03568638861179352,
0.06126312538981438,
-0.11249421536922455,
-0.004592877812683582,
-0.007299267686903477,
0.05972309410572052,
0.0677788034081459,
-0.005689670331776142,
-0.05558... | |||
and review purposes only.
[Page 112]
[Section Safe Alternatives]
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy.
2. Perform LO/TO procedures in accordance with this Program (e.g. requ... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.633 | 0.656 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.122916 | [
-0.05359828844666481,
0.14443853497505188,
-0.031742680817842484,
0.024214239791035652,
0.11773060262203217,
-0.04310372471809387,
-0.014645904302597046,
-0.013463443145155907,
-0.0899227038025856,
0.009803861379623413,
0.0037120941560715437,
0.06424765288829803,
0.010998668149113655,
-0.0... | |||
3. Participate in post-evaluations conducted by OSHA RA, Directorate Director
and/or Area Office Director, or designees each time LO/TO procedures are
implemented.
VI. Safe Alternatives
The following lists some options for... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.618 | 0.658 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.188731 | [
-0.02175929956138134,
0.11883004009723663,
-0.07599273324012756,
0.01825721189379692,
0.08215641975402832,
-0.03371744602918625,
0.014275345019996166,
0.07470385730266571,
-0.02779143489897251,
0.0464867502450943,
0.043319009244441986,
-0.014299874193966389,
0.036764755845069885,
0.0093850... | |||
m a safe location (e.g. a camera connected to an engineering
rod, camera equipped with zoom lens or video equipment);
Electronic measurement devices used from a safe distance/location (e.g. laser
measurement device);
Employer provided diagrams, dr... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.526 | 0.804 | ["interview"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.254860 | [
0.032339420169591904,
0.0047153569757938385,
-0.06477286666631699,
-0.052677713334560394,
0.04647388681769371,
-0.006129920482635498,
0.0791478157043457,
0.08657865226268768,
-0.01353025808930397,
0.06883376836776733,
0.10710296034812927,
-0.02464977838099003,
0.12658533453941345,
-0.01964... | |||
intenance personnel and machine or
equipment operators; and
Seek assistance from employer-authorized personnel in obtaining measurements and
evidence.
VII. Procedures
All OSHA employees, when working near equipment that is locked or tagged out, bu... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.441 | 0.814 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.320779 | [
-0.04899059608578682,
0.06240132451057434,
-0.013028547167778015,
0.0001598915841896087,
0.040427349507808685,
-0.057748205959796906,
0.08828632533550262,
-0.019634759053587914,
-0.05802561342716217,
0.012449908070266247,
0.07802761346101761,
0.020991601049900055,
-0.004017463885247707,
-0... | |||
are in place; and
2. Do not conduct activities that could lead to an exposure to the hazardous
energy if released.
In the rare occasion when an authorized employee needs to use a LO/TO device, the authorized
OSHA employee will first consider all other al... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.44 | 0.84 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.386615 | [
-0.02415521629154682,
0.09269225597381592,
0.013490387238562107,
0.00882167648524046,
0.06732384115457535,
-0.04517402499914169,
0.060119807720184326,
-0.030770594254136086,
0.004413889721035957,
-0.017121560871601105,
0.07363022863864899,
0.07832035422325134,
0.027172133326530457,
-0.0164... | |||
loyee will
share information with the on-site employer about equipment-specific LO/TO procedures. The
authorized OSHA employee must verify that the on-site employer’s procedures are effective in
identifying and isolating all applicable hazardous energy sources, and must obtain approval from
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.472 | 0.808 | ["management", "philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.452480 | [
-0.10033761709928513,
0.083438441157341,
0.0250575989484787,
-0.013817191123962402,
0.0908985286951065,
-0.06420427560806274,
0.08443639427423477,
-0.06459543853998184,
-0.04715614765882492,
-0.06501147896051407,
-0.009563172236084938,
0.0338369645178318,
-0.02079758420586586,
-0.038738220... | |||
13-34
* OSHA ARCHIVE DOCUMENT *
NOTICE: This document is presented here as historical content, for research and review purposes only.
[Page 113]
[Section When inspecting a machine or equipment that uses an electrical cord for power and]
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.615 | 0.834 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.518293 | [
-0.06755942851305008,
0.12321300804615021,
-0.01257619820535183,
0.03987458720803261,
0.06935863941907883,
-0.0670560896396637,
-0.050906408578157425,
0.0026510427705943584,
-0.04058700427412987,
0.04756348207592964,
0.09800534695386887,
0.10192476958036423,
0.027366410940885544,
0.0170610... | |||
cting a machine or equipment that uses an electrical cord for power and
the OSHA employee is required to place any part of his or her body into the point of
operation or danger zone, the OSHA employee should ask the on-site employer
representative to unplug it. ... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.47 | 0.848 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.584251 | [
-0.053492605686187744,
0.05129498615860939,
-0.03661945462226868,
0.023272525519132614,
-0.022212594747543335,
-0.024760795757174492,
0.038789570331573486,
-0.009632857516407967,
-0.0603790357708931,
0.04829825088381767,
0.08442535251379013,
0.05442051962018013,
0.03609331697225571,
0.0166... | |||
When an OSHA employee makes an initial determination that an inspection activity
(e.g. taking measurements, conducting a visual inspection) may require controlling
hazardous energy sources, either before or during an inspection, the employee must
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.462 | 0.652 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.650018 | [
0.015783732756972313,
0.07624360173940659,
0.043026696890592575,
0.04778850078582764,
0.0430910624563694,
-0.028498025611042976,
0.06276043504476547,
-0.0420692153275013,
-0.037715744227170944,
0.04241366311907768,
0.034564193338155746,
-0.017981871962547302,
0.014596041291952133,
-0.00950... | |||
2. If no alternatives are identified:
a. Thoroughly review the on-site employer’s LO/TO program, including
any machine-specific procedures, and determine the program’s
effectiveness. The OSHA employee must intervi... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.477 | 0.79 | ["interview"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.715852 | [
-0.061707641929388046,
0.056016210466623306,
0.012887446209788322,
0.002428053878247738,
0.06949004530906677,
-0.04421263933181763,
0.04241763800382614,
-0.0020614678505808115,
-0.11256920546293259,
-0.06508880108594894,
-0.030445976182818413,
0.04959115386009216,
0.015569808892905712,
-0.... | |||
oyee(s) are thoroughly familiar with the equipment, its hazardous
energy sources, and any procedures in place for isolating and
controlling hazardous energy.
b. Obtain and review any manufacturer’s information on LO/TO
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.602 | 0.648 | ["management", "philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.781800 | [
-0.07758747786283493,
0.08325091004371643,
0.016521459445357323,
0.039057470858097076,
0.06874987483024597,
-0.11823011934757233,
0.08701948076486588,
0.0008121944847516716,
-0.018274204805493355,
-0.028615865856409073,
-0.014834962785243988,
0.015582689084112644,
0.0037359364796429873,
-0... | |||
are requesting to lock out
hazardous energy to conduct inspection activities.
4. OSHA management and the OSHA employee requesting the approval will
discuss and consider all alternatives.
If no alternatives are ide... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.433 | 0.804 | ["management", "decision_making"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.847547 | [
-0.051295168697834015,
0.08990970999002457,
0.08336818963289261,
0.013939669355750084,
0.1137019544839859,
-0.08451098948717117,
0.07382633537054062,
-0.020095571875572205,
-0.035458870232105255,
-0.009440974332392216,
-0.0056678070686757565,
-0.030857181176543236,
-0.004509958438575268,
-... | |||
:
1. The requesting employee will continue with the inspection activities as an
authorized OSHA employee; or
2. Another authorized OSHA employee will proceed with the inspection
activities.
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.622 | 0.792 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.913393 | [
-0.03934377804398537,
0.04714098200201988,
0.05443970113992691,
-0.002535406732931733,
0.0540492981672287,
-0.08110111206769943,
0.08912055939435959,
-0.05483614653348923,
-0.04990294203162193,
-0.046653445810079575,
0.022382434457540512,
0.01617790386080742,
0.040304649621248245,
0.002511... | |||
13-35
* OSHA ARCHIVE DOCUMENT *
NOTICE: This document is presented here as historical content, for research and review purposes only.
[Page 114]
[Section VIII. Training]
* OSHA ARCHIVE DOCUMEN... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.481 | 0.812 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:41.980355 | [
-0.034457676112651825,
0.1147368773818016,
0.0066625457257032394,
0.05509786680340767,
0.07920365780591965,
-0.031343091279268265,
-0.048173703253269196,
-0.0046603805385529995,
-0.11326078325510025,
-0.003392646089196205,
-0.008043698035180569,
0.07873882353305817,
0.020516999065876007,
-... | |||
employer about OSHA’s LO/TO Program including the
procedure for the host employer to follow if a lock is left in place after the
OSHA employee leaves the facility.
2. Comply with OSHA requirements under 29 CFR 1910.147 and follow the
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.468 | 0.66 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.047399 | [
-0.0598330944776535,
0.06714772433042526,
-0.000550168682821095,
-0.012609180063009262,
0.07513608038425446,
-0.006292455829679966,
0.015021872706711292,
-0.04521360620856285,
-0.0888192430138588,
-0.03615133836865425,
0.0352620966732502,
0.03808114305138588,
0.007318529766052961,
0.019535... | |||
yee(s) fully de-energized
the equipment/machine and utilized an appropriate and effective energy
isolating device(s) for the equipment/machine.
4. Place his or her lock(s) on each isolating device for the equipment as part of
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.572 | 0.81 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.113450 | [
-0.09629873186349869,
0.12499196082353592,
0.009960673749446869,
0.007720482535660267,
0.03923714533448219,
-0.017903044819831848,
0.08823288977146149,
-0.09262808412313461,
-0.0030840446706861258,
-0.018774062395095825,
0.11232352256774902,
0.103382907807827,
0.02564132958650589,
-0.06181... | |||
he on-site employer’s authorized employee.
5. Ensure that the on-site employer’s authorized employee verifies that the
hazardous energy source is controlled after ensuring that personnel are not
potentially exposed to the hazardous energy... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.611 | 0.652 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.179273 | [
-0.0392545610666275,
0.06712525337934494,
0.02321918122470379,
0.006030640564858913,
0.05960375815629959,
-0.057051848620176315,
0.07627057284116745,
-0.026854954659938812,
-0.07194121927022934,
-0.0642813891172409,
0.012383460998535156,
0.018521243706345558,
0.010572463274002075,
0.038324... | |||
Authorized OSHA employees applying LO/TO procedures will:
a. Limit the time for conducting work activities that require hazardous
energy LO/TO to the absolute minimum needed to complete tasks.
b. Remove only their ene... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.608 | 0.646 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.245558 | [
-0.06935669481754303,
0.08907835930585861,
0.029033100232481956,
0.0003567781241144985,
0.056665532290935516,
-0.08151564747095108,
0.044801946729421616,
-0.05702578276395798,
0.0017191373044624925,
-0.013336154632270336,
0.017864923924207687,
0.010861569084227085,
0.009005988948047161,
0.... | |||
is complete when lockout devices are removed.
8. If the lockout device is unintentionally left on the equipment after leaving the
worksite, the on-site employer will contact the appropriate OSHA Office
befo... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.572 | 0.808 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.311480 | [
-0.041943714022636414,
0.1207055002450943,
0.05075572431087494,
-0.008318968117237091,
0.08081837743520737,
0.005458338186144829,
0.02750057727098465,
-0.09130378812551498,
0.03710860759019852,
-0.047226257622241974,
0.07040715217590332,
0.12212824076414108,
-0.06600083410739899,
-0.043534... | |||
ill return to the
site to remove the lock. Where the OSHA employee cannot return to the site,
the OSHA employee’s responsible OSHA Manager(s) may authorize
removing the lockout device(s) only after the OSHA employee’s location is
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.574 | 0.82 | ["management"] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.377499 | [
-0.057841695845127106,
0.08526007831096649,
-0.004526018630713224,
0.017099767923355103,
0.061786361038684845,
0.021838750690221786,
0.06177162751555443,
-0.1410943865776062,
-0.026375820860266685,
-0.007916856557130814,
0.09105999022722244,
0.08606236428022385,
-0.02235664799809456,
-0.04... | |||
ining is based on expected work activities as described below:
13-36
* OSHA ARCHIVE DOCUMENT *
NOTICE: This document is presented here as historical content, for research and review purposes only.
[Page 115]
[Section All OSHA em... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.495 | 0.82 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.443307 | [
-0.036602817475795746,
0.09545650333166122,
0.02448616735637188,
0.04098706692457199,
0.07924415171146393,
-0.06990673393011093,
-0.047573450952768326,
0.01315990835428238,
-0.053878799080848694,
0.03633284568786621,
0.01348976232111454,
0.08080132305622101,
0.02349000610411167,
0.00294982... | |||
CE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy.
All OSHA employees, including affected and authorized employees, will receive
training annually about this LO/TO Program and the Directorate/Area Office
procedures, purpose, functi... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.457 | 0.818 | [] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.509401 | [
-0.03681080415844917,
0.051359694451093674,
0.030780920758843422,
0.02601807750761509,
0.06150272861123085,
-0.027387285605072975,
0.012232939712703228,
-0.02702304534614086,
-0.02436101622879505,
-0.034349825233221054,
0.029643764719367027,
-0.04326961562037468,
0.04835963249206543,
0.011... | |||
annually or when conditions change that includes:
1. How to identify hazardous energy sources they might encounter during
inspections at another employer’s worksite;
2. Energy types and magnitudes they may encounter at another employer’... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.589 | 0.796 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.575192 | [
-0.03109707124531269,
0.08352454006671906,
0.07842876762151718,
0.037288691848516464,
0.09522663801908493,
0.011555754579603672,
0.006043622735887766,
-0.049775030463933945,
-0.06589433550834656,
-0.013653408735990524,
-0.022036321461200714,
-0.12329825758934021,
-0.03129354491829872,
-0.0... | |||
ed
inspection information;
4. Methods and means necessary for energy isolation and control;
5. The local procedures for requesting approval for using LO/TO procedures;
and
6. How to verif... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.395 | 0.802 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.641151 | [
-0.06887053698301315,
0.10107716917991638,
0.060183197259902954,
-0.0010618228698149323,
0.03198934718966484,
-0.012788334861397743,
0.01753067970275879,
-0.04260464757680893,
-0.0685705617070198,
-0.0023544037248939276,
0.004251827951520681,
0.029900487512350082,
-0.036415260285139084,
-0... | |||
will be conducted whenever a post-evaluation reveals, or the responsible
OSHA Manager(s) has reason to believe, that LO/TO procedures are not being used
properly or that the appropriate skills need refreshed.
IX. Recordkeeping
The applicable OSHA RA/Directorate Directo... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.635 | 0.658 | ["management", "philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.707115 | [
-0.06267832964658737,
0.06737644225358963,
-0.06124652177095413,
0.0417906828224659,
0.04987366870045662,
-0.051277272403240204,
-0.014500712044537067,
-0.005207023583352566,
-0.010584165342152119,
-0.014534324407577515,
-0.022403277456760406,
0.014083495363593102,
0.022986380383372307,
0.... | |||
2. Maintain documentation for lockout device issuance.
A suggested format for pre-application checklist and post-application evaluation is
enclosed in Chapter 13, Appendix A.
13-37
... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.597 | 0.808 | ["resume", "philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.772986 | [
-0.047077517956495285,
0.11886785924434662,
-0.029737668111920357,
0.017989253625273705,
0.037000346928834915,
0.007812624797224998,
0.02518274635076523,
0.04032422974705696,
-0.030965059995651245,
0.046277619898319244,
0.03999961167573929,
0.06757799535989761,
0.005545356310904026,
-0.068... | |||
Section APPENDIX A: CONTROL OF HAZARDOUS ENERGY SOURCES PRE-REQUEST]
* OSHA ARCHIVE DOCUMENT *
NOTICE: This is an OSHA ARCHIVE Document, and may no longer represent OSHA policy.
APPENDIX A: CONTROL OF HAZARDOUS ENERGY SOURCES PRE-REQUEST
FOR APPROVAL CHECKL... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.456 | 0.816 | ["resume"] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.838650 | [
-0.04189906641840935,
0.10096297413110733,
-0.00459659518674016,
0.05587423965334892,
0.07029935717582703,
-0.032771218568086624,
0.00887669250369072,
0.005052767228335142,
-0.05887187272310257,
0.025616712868213654,
-0.01470759604126215,
0.029847364872694016,
0.0006502237520180643,
-0.069... | |||
to implement lockout/tagout (LO/TO) procedures:
Have you explored all alternative methods for obtaining the information without needing
to lock out hazardous energy? Yes No
Does the employer have an effective LO/TO program? Yes No
Note: Review the employer’s LO/TO program to m... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.56 | 0.846 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.904427 | [
-0.06695316731929779,
0.10714025050401688,
-0.05110829696059227,
0.00629710266366601,
0.04382708668708801,
0.013747491873800755,
-0.0001932685700012371,
-0.03061291016638279,
-0.07208498567342758,
-0.04474186897277832,
-0.009772740304470062,
0.054241716861724854,
-0.016068236902356148,
-0.... | |||
Note: Obtain a copy and review the employer’s specific procedures to make sure they have
addressed all hazardous energy associated with the machine.
Does the employer have the correct lockout devices for use on the energy isolating
device? Yes No
Note: Make sure the emplo... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.557 | 0.844 | ["communication", "interview", "war_conflict"] | 512 | OSHA Test | topic | 2026-09-23T02:22:42.970406 | [
-0.0726027861237526,
0.11491407454013824,
0.022457122802734375,
0.023912660777568817,
0.022073589265346527,
-0.02523096092045307,
0.013032551854848862,
-0.07015460729598999,
-0.08355257660150528,
-0.07347911596298218,
0.09542547166347504,
0.03151301294565201,
-0.0204244926571846,
-0.070441... | |||
re that the employee is
thoroughly familiar with the equipment, its energy sources, and the procedures in place
for the purpose of isolation and control? Yes No
Have you informed the employer of OSHA’s LO/TO Program? Yes No
Have you informed your supervisor about your need... | upload://osha_safety | OSHA Test — Joe Tester | uploaded_content | false | 0.506 | 0.854 | ["philosophy"] | 512 | OSHA Test | topic | 2026-09-23T02:22:43.036529 | [
0.031184924766421318,
0.10523476451635361,
0.05699989199638367,
0.03415708616375923,
0.018378503620624542,
-0.06390880793333054,
0.04243772476911545,
-0.004709544591605663,
-0.09584522992372513,
-0.003147088922560215,
0.02151445671916008,
-0.0007808931404724717,
0.03324168175458908,
-0.020... |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.