Download conjunction/nasa_cara/DistributedMatlab/EventRate/EventRate.m from STAR-future/Trinity-SpaceData: direct link, hf CLI and curl.
- Browser
- Download file 10.2 kB
-
https://huggingface.co/datasets/STAR-future/Trinity-SpaceData/resolve/main/conjunction/nasa_cara/DistributedMatlab/EventRate/EventRate.m
- Command line
-
hf download hf://datasets/STAR-future/Trinity-SpaceData/conjunction/nasa_cara/DistributedMatlab/EventRate/EventRate.m
-
curl -L -o EventRate.m https://huggingface.co/datasets/STAR-future/Trinity-SpaceData/resolve/main/conjunction/nasa_cara/DistributedMatlab/EventRate/EventRate.m
10.2 kB
| function out = EventRate(paramsInfo) | |
| %% | |
| % EventRate - Estimate the rate conjunctions exceeding a threshold Pc value | |
| % occur for a model mission occupying an orbit/environment similar to that | |
| % of a primary satellite with data archived in the CARA database. | |
| % | |
| % Syntax: out = EventRate(paramsInfo); | |
| % | |
| % ========================================================================= | |
| % | |
| % Copyright (c) 2025-2026 United States Government as represented by the | |
| % Administrator of the National Aeronautics and Space Administration. | |
| % All Rights Reserved. | |
| % | |
| % ========================================================================= | |
| % | |
| % Description: | |
| % | |
| % Estimate the rate conjunctions exceeding a threshold Pc value occur for | |
| % a model mission occupying an orbit/environment similar to that of a | |
| % primary satellite or satellites with data archived in the CARA database. | |
| % | |
| % The analysis uses the method for semi-empirical conjunction risk analysis | |
| % as described in | |
| % | |
| % Doyle Hall (2019) "Determining Appropriate Risk Remediation Thresholds | |
| % from Empirical Conjunction Data using Survival Probability Methods" | |
| % AAS 19-631. | |
| % | |
| % Specifically, the "last-update" Pc value for an event must exceed a | |
| % user-specified Pc threshold to contribute to the estimated event rate. | |
| % For a model mission that conducts remediation mitigation maneuvers | |
| % (RMMs), last-update values are those estimated just before the | |
| % mission's RMM "commit" time (but also after the mission's RMM "consider" | |
| % time). The last-update Pc then can be regarded as the "perceived" | |
| % collision risk of the event. The algorithm uses the archived record of | |
| % last-update Pc values to estimate event rates, as well as the perceived | |
| % mission-cumulative collision risk. | |
| % | |
| % ========================================================================= | |
| % | |
| % Input: | |
| % | |
| % paramsInfo - Input parameter structure containing information regarding | |
| % the input conjunction data, analysis configuration and the | |
| % prospective mission to be analyzed. | |
| % | |
| % See EventRate_default_params.m and | |
| % EventRate_ConjDist_default_params.m for full | |
| % documentation. | |
| % | |
| % Required fields: | |
| % OCMDBFile OR PcTableFile - Name of an OCMDB data file | |
| % for processing. If OCMDBFile is used, EventRate will | |
| % precompute reference Pc values and save them to an | |
| % augmented PcTableFile. This file may be provided as a | |
| % PcTableFile parameter instead to skip preprocessing on | |
| % future runs. | |
| % | |
| % priset - A set of one or more mission surrogate | |
| % satellite NORAD IDs. These IDs must be present in the | |
| % OCMDBFile or PcTableFile data | |
| % | |
| % All other fields will be populated with default values if | |
| % not set | |
| % | |
| % ========================================================================= | |
| % | |
| % Output: | |
| % | |
| % out - output structure | |
| % | |
| % CumulativePcNoRMMs - [1x3] array of the [median, lower bound, | |
| % upper bound] of the 95% confidence interval | |
| % of estimated cumulative Pc for the | |
| % prospective mission duration without RMMs | |
| % considered | |
| % | |
| % CumulativePcWithRMMs - [1x3] array of the [median, lower bound, | |
| % upper bound] of the 95% confidence interval | |
| % of estimated cumulative Pc for the | |
| % prospective mission duration with RMMs | |
| % considered | |
| % | |
| % MissionEventRate - [1x3] array of the [median, lower bound, | |
| % upper bound] of the 95% confidencer interval | |
| % of estimated mission red event rate for the | |
| % prospective mission red threshold Pc. | |
| % | |
| % ConjDist - Structure containing various intermediate | |
| % values calculated within EventRate_ConjDist | |
| % | |
| % ========================================================================= | |
| % | |
| % References: | |
| % | |
| % Doyle Hall (2019) "Determining Appropriate Risk Remediation Thresholds | |
| % from Empirical Conjunction Data using Survival Probability Methods" | |
| % AAS 19-631. | |
| % | |
| % ========================================================================= | |
| % | |
| % Dependencies: | |
| % | |
| % ProcessPcTable.m | |
| % EventRate_ConjDist.m | |
| % EventRate_default_params.m | |
| % | |
| % ========================================================================= | |
| % | |
| % Subfunctions: | |
| % | |
| % None | |
| % | |
| % ========================================================================= | |
| % | |
| % Disclaimer: | |
| % | |
| % No Warranty: THE SUBJECT SOFTWARE IS PROVIDED "AS IS" WITHOUT ANY | |
| % WARRANTY OF ANY KIND, EITHER EXPRESSED, IMPLIED, OR STATUTORY, | |
| % INCLUDING, BUT NOT LIMITED TO, ANY WARRANTY THAT THE SUBJECT SOFTWARE | |
| % WILL CONFORM TO SPECIFICATIONS, ANY IMPLIED WARRANTIES OF | |
| % MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, OR FREEDOM FROM | |
| % INFRINGEMENT, ANY WARRANTY THAT THE SUBJECT SOFTWARE WILL BE ERROR | |
| % FREE, OR ANY WARRANTY THAT DOCUMENTATION, IF PROVIDED, WILL CONFORM TO | |
| % THE SUBJECT SOFTWARE. THIS AGREEMENT DOES NOT, IN ANY MANNER, | |
| % CONSTITUTE AN ENDORSEMENT BY GOVERNMENT AGENCY OR ANY PRIOR RECIPIENT | |
| % OF ANY RESULTS, RESULTING DESIGNS, HARDWARE, SOFTWARE PRODUCTS OR ANY | |
| % OTHER APPLICATIONS RESULTING FROM USE OF THE SUBJECT SOFTWARE. | |
| % FURTHER, GOVERNMENT AGENCY DISCLAIMS ALL WARRANTIES AND LIABILITIES | |
| % REGARDING THIRD-PARTY SOFTWARE, IF PRESENT IN THE ORIGINAL SOFTWARE, | |
| % AND DISTRIBUTES IT "AS IS." | |
| % | |
| % Waiver and Indemnity: RECIPIENT AGREES TO WAIVE ANY AND ALL CLAIMS | |
| % AGAINST THE UNITED STATES GOVERNMENT, ITS CONTRACTORS AND | |
| % SUBCONTRACTORS, AS WELL AS ANY PRIOR RECIPIENT. IF RECIPIENT'S USE OF | |
| % THE SUBJECT SOFTWARE RESULTS IN ANY LIABILITIES, DEMANDS, DAMAGES, | |
| % EXPENSES OR LOSSES ARISING FROM SUCH USE, INCLUDING ANY DAMAGES FROM | |
| % PRODUCTS BASED ON, OR RESULTING FROM, RECIPIENT'S USE OF THE SUBJECT | |
| % SOFTWARE, RECIPIENT SHALL INDEMNIFY AND HOLD HARMLESS THE UNITED | |
| % STATES GOVERNMENT, ITS CONTRACTORS AND SUBCONTRACTORS, AS WELL AS ANY | |
| % PRIOR RECIPIENT, TO THE EXTENT PERMITTED BY LAW. RECIPIENT'S SOLE | |
| % REMEDY FOR ANY SUCH MATTER SHALL BE THE IMMEDIATE, UNILATERAL | |
| % TERMINATION OF THIS AGREEMENT. | |
| % | |
| % ========================================================================= | |
| % | |
| % Initial version: Apr 2022; Latest update: Feb 2026 | |
| % | |
| % ----------------- BEGIN CODE ----------------- | |
| %% Initializations | |
| persistent pathsAdded | |
| if isempty(pathsAdded) | |
| [p,~,~] = fileparts(mfilename('fullpath')); | |
| s = what(fullfile(p,'/params')); addpath(s.path); | |
| s = what(fullfile(p,'/src')); addpath(s.path); | |
| s = what(fullfile(p,'/src/matlab_lib')); addpath(s.path); | |
| s = what(fullfile(p,'/src/ConjDist')); addpath(s.path); | |
| s = what(fullfile(p,'../ProbabilityOfCollision')); addpath(s.path); | |
| s = what(fullfile(p,'../Utils/AugmentedMath')); addpath(s.path); | |
| s = what(fullfile(p,'../Utils/CovarianceTransformations')); addpath(s.path); | |
| s = what(fullfile(p,'../Utils/General')); addpath(s.path); | |
| s = what(fullfile(p,'../Utils/Plotting/Utils')); addpath(s.path); | |
| s = what(fullfile(p,'../Utils/TimeTransformations')); addpath(s.path); | |
| pathsAdded = true; | |
| end | |
| % Initialize the program execution parameters | |
| if nargin < 1 | |
| params = []; | |
| else | |
| params = initialize_params(paramsInfo); | |
| end | |
| %% Augment params structure with the default EventRate parameters | |
| params = EventRate_default_params(params); | |
| %% Automatically combine and partitioned files, as needed | |
| CombinePartitionedFiles(params.SplitFilesDir, params.DataDir); | |
| %% Check for OCMDB file and associated Pc table file | |
| if params.PcTable_mode == 0 | |
| % Check for the existence of the OCMDB file | |
| if ~exist(params.OCMDBfile,'file') | |
| [~,f,e] = fileparts(params.OCMDBfile); | |
| warning(['Could not find OCMDB data file: ' [f e]]); | |
| out = []; | |
| return; | |
| end | |
| % Set PcTable to null to indicate Pc table mode is not being used | |
| params.PcTable = []; | |
| else | |
| % Do the processesing required to use Pc table mode | |
| params = ProcessPcTable(params); | |
| % Ensure Pc table and DB exist | |
| if isempty(params.PcTable) || isempty(params.DB) | |
| warning('Invalid Pc table or DB array'); | |
| out = []; | |
| return; | |
| end | |
| % Return now if only building the PcTable, and not doing any other | |
| % EventRate processing | |
| if params.PcTable_mode == 3 | |
| out = []; | |
| return; | |
| end | |
| % Return with warning if using exclude_noncatastrophic parameter, which | |
| % is incompatible with PcTable mode | |
| if params.exclude_noncatastrophic | |
| warning('Pc table mode incompatible with exclude_noncatastrophic parameter'); | |
| out = []; | |
| return; | |
| end | |
| end | |
| %% Perform the EventRate processing | |
| % (using the EventRate version of the ConjDist function) | |
| out = EventRate_ConjDist(params); | |
| return | |
| end | |
| % ----------------- END OF CODE ------------------ | |
| % | |
| % Please record any changes to the software in the change history | |
| % shown below: | |
| % | |
| % ----------------- CHANGE HISTORY ------------------ | |
| % Developer | Date | Description | |
| % --------------------------------------------------- | |
| % D. Hall | 2022-Apr-11 | Initial version. | |
| % L. Baars | 2026-Feb-24 | Added call to combine partitioned files. | |
| % ========================================================================= | |
| % | |
| % Copyright (c) 2025-2026 United States Government as represented by the | |
| % Administrator of the National Aeronautics and Space Administration. | |
| % All Rights Reserved. | |
| % | |
| % ========================================================================= |