Trinity-SpaceData / conjunction /nasa_cara /DistributedMatlab /EventRate /src /ConjDist /EventRate_ConjDist.m
Download conjunction/nasa_cara/DistributedMatlab/EventRate/src/ConjDist/EventRate_ConjDist.m from STAR-future/Trinity-SpaceData: direct link, hf CLI and curl.
- Browser
- Download file 136 kB
-
https://huggingface.co/datasets/STAR-future/Trinity-SpaceData/resolve/main/conjunction/nasa_cara/DistributedMatlab/EventRate/src/ConjDist/EventRate_ConjDist.m
- Command line
-
hf download hf://datasets/STAR-future/Trinity-SpaceData/conjunction/nasa_cara/DistributedMatlab/EventRate/src/ConjDist/EventRate_ConjDist.m
-
curl -L -o EventRate_ConjDist.m https://huggingface.co/datasets/STAR-future/Trinity-SpaceData/resolve/main/conjunction/nasa_cara/DistributedMatlab/EventRate/src/ConjDist/EventRate_ConjDist.m
136 kB
function [out,params] = EventRate_ConjDist(params)
% EventRate_ConjDist - Calculate and plot conjunction distributions for a
% specified set of CARA primary objects
% Syntax: [out, params] = EventRate_ConjDist(params);
%
% =========================================================================
%
% Copyright (c) 2025 United States Government as represented by the
% Administrator of the National Aeronautics and Space Administration.
% All Rights Reserved.
%
% =========================================================================
%
% Description: Calculate and plot conjunction distributions for a specified
% set of CARA primary objects
%
% This code has been adapted from the original ConjDist.m R&D code,
% adjusted to work with the EventRate.m function, by turning several
% of its original modes off.
%
% =========================================================================
%
% Input:
%
% params - Auxilliary input parameter structure
%
% =========================================================================
%
% Output:
%
% out - Output structure with the following fields:
%
% MissionEventRate: 5-50-95 percentile estimated red
% event rates for the given mission at the input Pc
% threshold
%
% ConjDist: Output substructure containing various
% intermediate values used to obtain output plots
%
% params - Structure. See 'EventRate_ConjDist_default_params.m' for more
% documentation
%
% =========================================================================
%
% References:
%
% Doyle Hall (2019) "Determining Appropriate Risk Remediation Thresholds
% from Empirical Conjunction Data using Survival Probability Methods"
% AAS 19-631.
%
% =========================================================================
%
% Dependencies:
%
% ConjDist_binofit.m
% ConjDist_set_resample.m
% EventRate_ConjDist_default_params.m
% ConjDist_update_plot.m
% ConjDist_altlat_plot.m
% ConjDist_time_plot.m (Only if reporting SVI rates)
%
% ../../../CovarianceRealism
% ../../../Utils/OrbitTransformations
% ../../../Utils/CovarianceTransformations
% ../../../Utils/LoggingAndStringReporting
% ../../../Utils/Plotting
% ../../../Utils/TimeTransformations
%
% For 'exclude non-catastrophic events':
%
% ../../../ProbabilityOfCollision
% ../../../Utils/AugmentedMath
%
% =========================================================================
%
% Subfunctions:
%
% None
%
% =========================================================================
%
% Initial version: Apr 2022; Latest update: Oct 2025
%
% ----------------- BEGIN CODE -----------------
%% Initializations and defaults
persistent pathsAdded
if isempty(pathsAdded)
[p,~,~] = fileparts(mfilename('fullpath'));
s = what(fullfile(p,'../matlab_lib')); addpath(s.path);
s = what(fullfile(p,'../../../CovarianceRealism')); addpath(s.path);
s = what(fullfile(p,'../../../CollisionConsequence')); addpath(s.path);
s = what(fullfile(p,'../../../Utils/OrbitTransformations')); addpath(s.path);
s = what(fullfile(p,'../../../Utils/CovarianceTransformations')); addpath(s.path);
s = what(fullfile(p,'../../../Utils/LoggingAndStringReporting')); addpath(s.path);
s = what(fullfile(p,'../../../Utils/Plotting')); addpath(s.path);
s = what(fullfile(p,'../../../Utils/TimeTransformations')); addpath(s.path);
pathsAdded = true;
end
Nargin = nargin;
if (Nargin < 1); params =[]; end
% Flag indicating if pretabulated Pc table mode is being used
using_PcTable = ~isempty(params.PcTable);
% Matlab date number zero point JD
JD0 = timestring_to_jd('0000-01-00 00:00:00');
% Figure handles
fighandle0 = [];
fighandle1 = [];
fighandle2 = [];
% Set up for plotting
xfsz = 12;
xfwt = 'bold';
yfsz = xfsz;
yfwt = xfwt;
tfsz = xfsz;
tfwt = 'bold';
tfan = 'italic';
afsz = xfsz;
afwt = 'bold';
alwd = 1;
% Padding string
pad20 = repmat(' ',[1 20]);
% 95% confidence chi-squared factor
chifact = sqrt(chi2inv(0.95,1));
% Initialize output
out = [];
% Initialize PcMultiStep parameters
PcMultiStep_params = [];
PcMultiStep_params.OnlyPc2DCalculation = true;
% Set up EventRate processing modes
if params.EventRate_estimation_mode == 1
% Given Tmis and Prem, find Pcum(noRMM), Pcum(w/RMM) and RMM-Rate
PcRemEstimation = false;
params.Pcmission = NaN;
params.PcRMMexecution = params.EventRate_Pc_value;
L10PremExecution = log10(params.PcRMMexecution);
elseif params.EventRate_estimation_mode == 2
% Given Tmis & Pcum(w/RMM), find Pcum(noRMM) and Prem
PcRemEstimation = true;
params.Pcmission = params.EventRate_Pc_value;
params.PcRMMexecution = NaN;
L10Pcmission = log10(params.Pcmission);
else
error('Invalid EventRate_estimation_mode parameter');
end
% Other ConjDist parameters
params.Tmissionyrs = params.mission_duration_years;
params.CommitConsiderHours = 24*[params.Tcommit_days params.Tconsider_days];
params.add_one_unrem_event = false;
% Prem image array
L10Pr1 = -7; L10Pr2 = -2;
if ~PcRemEstimation
LPcRMMexecution = log10(params.PcRMMexecution);
L10Pr1 = min(L10Pr1,LPcRMMexecution);
L10Pr2 = max(L10Pr2,LPcRMMexecution);
end
NL10Pr = round(10*(L10Pr2-L10Pr1))+1;
params.L10PremImage = [L10Pr1 L10Pr2 NL10Pr];
params.log10PremSearch = params.L10PremImage;
% Make Rho vs Prem image (only in mode 2 when estimating Prem)
params.FredVsPremImage = true;
params.L10FredImage = [-2.5 0 26]; % [L10Fr1 L10Fr2 NFr]
% Table of mission durations
params.TmisTable = [0.5 1 2 3 5 7.5 10 12.5 15 20 25];
params.L10PcmisTable = [-6 -5 -4 -3 -2];
% Parameters of mission duration array for images (must be constructed to
% include all TmisTable entries)
params.TmisImage = [0.5 25 50]; % [Tm1 Tm2 NTm]
% Parameters for mission duration array for x-y plots
params.Tmissionyrsplot = [params.TmisImage(1)/1.5 params.TmisImage(2)*1.5 params.TmisImage(3)*2];
% Make conjunction latitude vs altitude spatial distribution plots
if params.plot_spatial_distribution
params.make_altlat_plots = -4;
else
params.make_altlat_plots = 0;
end
if strcmpi(params.redyel_event_option,'lud')
% Last update Pc value between consider and commit times,
% used for modeling RMM execution rates
PcLUDvsPcMaxOption = 1;
elseif strcmpi(params.redyel_event_option,'mud')
% Maximum update Pc value between consider and commit times,
% used for modeling RMM planning rates
PcLUDvsPcMaxOption = 2;
else
% Non standard operational mode
PcLUDvsPcMaxOption = 0;
end
% Construct an output file root name
if PcRemEstimation
ModeStr = 'RMMPcLevel';
else
if PcLUDvsPcMaxOption == 1
ModeStr = 'RMMExecutionRate';
elseif PcLUDvsPcMaxOption == 2
ModeStr = 'RMMPlanningRate';
else
ModeStr = 'EventRate';
end
end
MisNamStr = ['_' params.mission_name];
if isfield(params,'priorb')
if ~isempty(params.priorb)
OrbStr = ['_' params.priorb];
end
else
OrbStr = '';
end
% Base output file root
output_file_root0 = [ModeStr MisNamStr OrbStr '_' params.prisetstr ...
'_HBR' num2str(params.mission_HBR_meters) 'm' ...
'_Com' smart_exp_format(params.Tcommit_days,3) 'to' ...
smart_exp_format(params.Tconsider_days,3) 'dy'];
% If excluding likely non-catastrophic collisions, include mass
% estimate in output file names
if params.exclude_noncatastrophic
output_file_root0 = [output_file_root0 '_Mass' ...
smart_exp_format(params.mission_on_orbit_mass_kg,3) 'kg'];
end
% Add mission duration to output file names
output_file_root = [output_file_root0 ...
'_Dur' num2str(params.Tmissionyrs) 'yr'];
% Add secondary catalog growth parameter to output file names
SecCatGrowth = params.SecondaryCatalogGrowth;
output_file_root = [output_file_root '_Grow' num2str(SecCatGrowth)];
% Add conservative mode flag to output file names
if params.add_one_unrem_event
output_file_root = [output_file_root '_Conservative'];
end
% Set the run tag to be the same as the output file root
params.runtag = output_file_root;
% Set remaining ConjDist parameters to defaults
params = EventRate_ConjDist_default_params(params);
% Turn off EventRate_ConjDist flags that are incompatible with PcTable mode
if using_PcTable
if params.association_check
warning('PcTable incompatible with association_check parameter - turning off');
params.association_check = false;
end
end
% Log/display initiation time
logstr = ' ';
log_string(params.logfid,logstr,params.logging,params.displaying);
logstr = [params.start_time ' Executing function EventRate_ConjDist'];
log_string(params.logfid,logstr,params.logging,params.displaying);
%% Load database (DB) contained in the OCMDB file, if required
if using_PcTable
% If we're in PcTable mode, we don't have to check for an OCMDB file
logstr = [current_timestring() ' Using OCMDB Pc table processing mode'];
log_string(params.logfid,logstr,params.logging,params.displaying);
else
if isempty(params.DB)
logstr = [current_timestring() ' Loading OCMDB file ' ...
params.OCMDBroot params.OCMDBext];
log_string(params.logfid,logstr,params.logging,params.displaying);
params.DB = load(params.OCMDBfile);
params.DB = params.DB.DB;
else
logstr = [current_timestring() ' Found DB array for OCMDB file ' ...
params.OCMDBroot params.OCMDBext];
log_string(params.logfid,logstr,params.logging,params.displaying);
end
end
[Ntot,Ncol] = size(params.DB);
if (Ncol < 218)
error('Insufficient number of OCMDB columns');
end
logstr = [current_timestring() ' Conjunctions in the entire DB: ' ...
num2str(Ntot)];
log_string(params.logfid,logstr,params.logging,params.displaying);
if ~using_PcTable
% If not using a PcTable, then eliminate bad conjunctions.
% (This elimination has already been done if using a PcTable.)
params.DB = EliminateBadDBEntries(params.DB,1,1,1,0);
Ntot = size(params.DB,1);
logstr = [current_timestring() ...
' Conjunctions in DB after eliminating bad entries: ' ...
num2str(Ntot)];
log_string(params.logfid,logstr,params.logging,params.displaying);
end
% Report the primary set
logstr = [current_timestring() ' Primary set ID = ' params.prisetstr];
log_string(params.logfid,logstr,params.logging,params.displaying);
Npri = params.Npri;
if Npri > 1
for np=1:Npri
logstr = [pad20 num2str(params.priset(np),'%05i ')];
log_string(params.logfid,logstr,params.logging,params.displaying);
end
end
% Copy the DB over to an output variable before adjustments
out.ConjDist.DB = params.DB;
% Build the covariance matrix blocks
CovBuild6 = triu(ones(6,6))';
CovBuild6(CovBuild6~=0) = 1:21;
CovBuild6 = CovBuild6 + triu(CovBuild6',1);
% Record primary set in output
out.ConjDist.Npri = Npri;
out.ConjDist.priset = params.priset; out.ConjDist.prisetstr = params.prisetstr;
% Use DB TCA extrema as the TCA limits if not provided
if isempty(params.TCAlimits_UT)
impose_TCAlimits = false;
out.ConjDist.TCAlimits(1) = min(out.ConjDist.DB(:,166));
out.ConjDist.TCAlimits(2) = max(out.ConjDist.DB(:,166));
else
impose_TCAlimits = true;
if strcmpi(class(params.TCAlimits_UT),'double')
% Relative limits
out.ConjDist.TCAlimits(1) = min(out.ConjDist.DB(:,166))+params.TCAlimits_UT(1);
out.ConjDist.TCAlimits(2) = max(out.ConjDist.DB(:,166))-params.TCAlimits_UT(2);
else
% Absolute limits
out.ConjDist.TCAlimits(1) = datenum(round_timestring(params.TCAlimits_UT{1}), ...
'yyyy-mm-dd HH:MM:SS.FFF');
out.ConjDist.TCAlimits(1) = max(out.ConjDist.TCAlimits(1),min(out.ConjDist.DB(:,166)));
out.ConjDist.TCAlimits(2) = datenum(round_timestring(params.TCAlimits_UT{2}), ...
'yyyy-mm-dd HH:MM:SS.FFF');
out.ConjDist.TCAlimits(2) = min(out.ConjDist.TCAlimits(2),max(out.ConjDist.DB(:,166)));
out.ConjDist.TCAlimits = sort(out.ConjDist.TCAlimits);
end
end
% Eliminate all 90000 series secondaries
ndx = (out.ConjDist.DB(:,2) >= 90000);
if any(ndx)
logstr = [current_timestring() ...
' Eliminating ' num2str(sum(ndx)) ...
' conjunctions involving 90000-series secondaries'];
log_string(params.logfid,logstr,params.logging,params.displaying);
out.ConjDist.DB = out.ConjDist.DB(~ndx,:);
end
% Find all conjunctions in the entire DB involving the specified primaries
% and secondaries
ndx = ismember(out.ConjDist.DB(:,1),params.priset);
if ~isempty(params.secset)
secstr = '+secondary';
ndx = ndx & ismember(out.ConjDist.DB(:,2),params.secset);
else
secstr = '';
end
Nconj = sum(ndx);
logstr = [current_timestring() ...
' Conjunctions involving the primary' secstr ' set: ' ...
num2str(Nconj) ' of ' num2str(Ntot)];
log_string(params.logfid,logstr,params.logging,params.displaying);
% Restrict output DB to the specified primaries
out.ConjDist.DB = out.ConjDist.DB(ndx,:);
% Return for no conjunctions involving the primary set
if (Nconj == 0)
if params.logging; fclose(params.logfid); end
return;
end
%% Associate updates into "events" (i.e., conjunction update sequences)
% which all have the same primary and secondary and very nearly the same
% TCA
TCAdel = 0.5*(params.TCAtol_s/86400);
out.ConjDist.event = NaN(Nconj,1);
Nevent = 0;
for n=1:Nconj
% Only attempt to associate previously unassociated conjunctions
if isnan(out.ConjDist.event(n))
% Secondary
p = out.ConjDist.DB(n,1);
s = out.ConjDist.DB(n,2);
% TCA (days since January 0, 0000)
TCA = out.ConjDist.DB(n,166);
TCA1 = TCA-TCAdel;
TCA2 = TCA+TCAdel;
% Associate conjunctions
ndx = isnan(out.ConjDist.event) & ...
(p == out.ConjDist.DB(:,1)) & ...
(s == out.ConjDist.DB(:,2)) & ...
(out.ConjDist.DB(:,166) >= TCA1 & ...
(out.ConjDist.DB(:,166) <= TCA2));
Nndx = sum(ndx);
if (Nndx == 0)
error('Failure to find any updates');
end
Nevent = Nevent + 1;
out.ConjDist.event(ndx) = Nevent;
% Check for disagreements with OCMDB file associations
if params.association_check
origevent = out.ConjDist.DB(n,217);
mdx = (out.ConjDist.DB(:,217) == origevent);
mdx_ne_ndx = ~isequal(ndx,mdx);
if mdx_ne_ndx
wrnstr = ['Association disagreement: n = ' num2str(n) ...
' p = ' num2str(p) ' s = ' num2str(s) ...
' TCA = ' datestr(TCA,31)];
warning(wrnstr);
logstr = ['WARNING: ' wrnstr];
log_string(params.logfid,logstr,params.logging,params.displaying);
for npass=1:2
if npass == 1
idx = find(ndx);
Nidx = numel(idx);
logstr = [' ConjDist associations:'];
else
idx = find(mdx);
Nidx = numel(idx);
logstr = [' OCMDB associations:'];
end
log_string(params.logfid,logstr,params.logging,params.displaying);
mdT = median(out.ConjDist.DB(idx,166));
mdX = median(out.ConjDist.DB(idx,172));
mdY = median(out.ConjDist.DB(idx,173));
mdZ = median(out.ConjDist.DB(idx,174));
for nn=1:Nidx
ii = idx(nn);
logstr = [' ' datestr(out.ConjDist.DB(ii,166),'yyyy-mm-dd HH:MM:SS.FFF') ...
' Dt=' num2str(86400*(mdT-out.ConjDist.DB(ii,166))) 's ' ...
' Dx=' num2str(mdX-out.ConjDist.DB(ii,172)) 'm ' ...
' Dy=' num2str(mdY-out.ConjDist.DB(ii,173)) 'm ' ...
' Dz=' num2str(mdZ-out.ConjDist.DB(ii,174)) 'm '];
log_string(params.logfid,logstr,params.logging,params.displaying);
end
end
end
end
end
end
if any(isnan(out.ConjDist.event))
error('Failure to associate all conjunction updates');
end
out.ConjDist.Nevent = Nevent;
logstr = [current_timestring() ...
' Associated unique events involving the primary set: ' ...
num2str(Nevent)];
log_string(params.logfid,logstr,params.logging,params.displaying);
% Return for no conjunctions involving the primary set
if (Nevent == 0)
if params.logging; fclose(params.logfid); end
return;
end
% Calculate the median TCA for each event
out.ConjDist.TCAmed = NaN(Nevent,1);
for ne=1:Nevent
ndx = (ne == out.ConjDist.event);
out.ConjDist.TCAmed(ne) = median(out.ConjDist.DB(ndx,166));
end
minTCAmed = min(out.ConjDist.TCAmed);
maxTCAmed = max(out.ConjDist.TCAmed);
minTCA = round_timestring(jd_to_timestring(JD0+minTCAmed),'m');
maxTCA = round_timestring(jd_to_timestring(JD0+maxTCAmed),'m');
delTCA_yr = (maxTCAmed-minTCAmed)/365.25;
logstr = [current_timestring() ...
' Time spanned by median event TCA values: '];
log_string(params.logfid,logstr,params.logging,params.displaying);
logstr = [pad20 minTCA ' to ' maxTCA ' (' ...
num2str(delTCA_yr,'%0.2f') ' yr)'];
log_string(params.logfid,logstr,params.logging,params.displaying);
% Eliminate events with median TCAs outside the TCA limits
out.ConjDist.Nconj0 = Nconj;
out.ConjDist.Nevent0 = out.ConjDist.Nevent;
if impose_TCAlimits
logstr = [current_timestring() ...
' Restricting to median event TCA limits: '];
log_string(params.logfid,logstr,params.logging,params.displaying);
if strcmpi(class(params.TCAlimits_UT),'double')
logstr = [' ' num2str(params.TCAlimits_UT(1)) ' days after beginning'...
' to ' num2str(params.TCAlimits_UT(2)) ' days before ending'];
else
logstr = [' ' params.TCAlimits_UT{1} ' to ' params.TCAlimits_UT{2}];
end
log_string(params.logfid,logstr,params.logging,params.displaying);
% Find events within the TCA limits
inlimits = find( (out.ConjDist.TCAlimits(1) <= out.ConjDist.TCAmed) & ...
(out.ConjDist.TCAlimits(2) >= out.ConjDist.TCAmed) );
Ninlimits = numel(inlimits);
if (Ninlimits < Nevent)
% Some events are not within TCA limits and need to be excluded
% Find the index values for all raw conjunctions within the TCA
% limits
for ni=1:Ninlimits
ne = inlimits(ni);
if (ni == 1)
ndx = (ne == out.ConjDist.event);
else
ndx = ndx | (ne == out.ConjDist.event);
end
end
% Update the number of raw conjunctions, and restrict the output DB
% to those within the TCA limits
Nconj = sum(ndx);
out.ConjDist.DB = out.ConjDist.DB(ndx,:);
% Update the events and their median TCA values
resevent = out.ConjDist.event(ndx);
unqevent = unique(resevent);
Nunqevent = numel(unqevent);
newevent = NaN(Nconj,1);
for nue=1:Nunqevent
idx = (unqevent(nue) == resevent);
newevent(idx) = nue;
end
Nevent = Ninlimits;
out.ConjDist.Nevent = Nevent;
out.ConjDist.event = newevent;
out.ConjDist.TCAmed = out.ConjDist.TCAmed(inlimits);
end
logstr = [current_timestring() ...
' Associated conjunction events within TCA limits: ' ...
num2str(Nevent)];
log_string(params.logfid,logstr,params.logging,params.displaying);
minTCAmed = min(out.ConjDist.TCAmed);
maxTCAmed = max(out.ConjDist.TCAmed);
minTCA = round_timestring(jd_to_timestring(JD0+minTCAmed),'m');
maxTCA = round_timestring(jd_to_timestring(JD0+maxTCAmed),'m');
delTCA_yr = (maxTCAmed-minTCAmed)/365.25;
logstr = [current_timestring() ...
' Time spanned by median event TCA values within limits: '];
log_string(params.logfid,logstr,params.logging,params.displaying);
logstr = [' ' minTCA ' to ' maxTCA ' (' ...
num2str(delTCA_yr,'%0.2f') ' yr)'];
log_string(params.logfid,logstr,params.logging,params.displaying);
end
out.ConjDist.Nconj = Nconj;
%% Apogee, perigee and inclination extracted from DB array
ii = 51;
mdapo = median(out.ConjDist.DB(:,ii));
mnapo = mean(out.ConjDist.DB(:,ii));
sgapo = std(out.ConjDist.DB(:,ii));
ii = 52;
mdper = median(out.ConjDist.DB(:,ii));
mnper = mean(out.ConjDist.DB(:,ii));
sgper = std(out.ConjDist.DB(:,ii));
ii = 53;
mdinc = median(out.ConjDist.DB(:,ii));
mninc = mean(out.ConjDist.DB(:,ii));
sginc = std(out.ConjDist.DB(:,ii));
logstr = [current_timestring() ' Primary set perigee median, mean, std: ' ...
num2str(mdper) ' ' num2str(mnper) ' ' num2str(sgper)];
log_string(params.logfid,logstr,params.logging,params.displaying);
logstr = [current_timestring() ' Primary set apogee median, mean, std: ' ...
num2str(mdapo) ' ' num2str(mnapo) ' ' num2str(sgapo)];
log_string(params.logfid,logstr,params.logging,params.displaying);
logstr = [current_timestring() ' Primary set inclination median, mean, std: ' ...
num2str(mdinc) ' ' num2str(mninc) ' ' num2str(sginc)];
log_string(params.logfid,logstr,params.logging,params.displaying);
%% Find all of the unique secondaries and recalculate Pc values if required
% Unique secondaries
sec = unique(out.ConjDist.DB(:,2));
out.ConjDist.Nsec = numel(sec);
logstr = [current_timestring() ...
' Unique secondaries in associated conjunction events: ' ...
num2str(out.ConjDist.Nsec)];
log_string(params.logfid,logstr,params.logging,params.displaying);
% Allocate array for new Pc values
Pcnew = NaN(Nconj,1);
% Use Pc interpolation table, if available, otherwise calculate values
if ~using_PcTable
% Use OCMDB states and covariances to calculate new Pc values
logstr = [current_timestring() ...
' Calculating ' num2str(Nconj) ' Pc values' ...
' with HBRnew = ' num2str(params.mission_HBR_meters) 'm)'];
log_string(params.logfid,logstr,params.logging,params.displaying);
% Extract stats in meter units
DBX1 = out.ConjDist.DB(:,172:177)*1e3;
DBC1 = out.ConjDist.DB(:,73:93);
DBX2 = out.ConjDist.DB(:,178:183)*1e3;
DBC2 = out.ConjDist.DB(:,133:153);
HBRmeters = params.mission_HBR_meters;
hbar = parfor_progressbar(Nconj,'','Name','New HBR Pc Calculation');
for nc=1:Nconj % parfor enabled
% Primary object ECI state
X1 = DBX1(nc,:);
% Primary object covariance
TriEls = DBC1(nc,:);
C1UVW = TriEls(CovBuild6);
% Convert UVW (same as the RIC) to ECI
C1ECI = RIC2ECI(C1UVW,X1(1:3),X1(4:6));
C1ECI = cov_make_symmetric(C1ECI);
% Secondary object ECI state
X2 = DBX2(nc,:);
% Secondary object covariance
TriEls = DBC2(nc,:);
C2UVW = TriEls(CovBuild6);
% Convert UVW (same as the RIC) to ECI
C2ECI = RIC2ECI(C2UVW,X2(1:3),X2(4:6));
C2ECI = cov_make_symmetric(C2ECI);
% Calculate Pc
Pcnew(nc) = PcMultiStep( ...
X1(1:3),X1(4:6),C1ECI, ...
X2(1:3),X2(4:6),C2ECI, ...
HBRmeters,PcMultiStep_params);
hbar.iterate(1);
end
clear DBX1 DBC1 DBX2 DBC2;
close(hbar);
else
% Use Pc interpolation table to calculate new Pc values
logstr = [current_timestring() ...
' Interpolating ' num2str(Nconj) ' new Pc ' ...
'values because of potential HBR mismatch (HBRnew=' ...
num2str(params.mission_HBR_meters) 'm)'];
log_string(params.logfid,logstr,params.logging,params.displaying);
% Ensure HBR is within the Pc table range
if params.PcTable.HBRmin_meters > params.mission_HBR_meters || ...
params.PcTable.HBRmax_meters < params.mission_HBR_meters
error('Specified mission HBR must be within PcTable range');
else
% First determine if HBR is on the PcTable grid
[~,nHBR0] = min(abs(params.PcTable.HBR-params.mission_HBR_meters));
if params.PcTable.HBR(nHBR0) == params.mission_HBR_meters
HBR_on_grid = true;
else
% Define points bracketing HBR in table
HBR_on_grid = false;
log10HBRnew = log10(params.mission_HBR_meters);
nHBR1 = nHBR0-3;
if nHBR1 < 1
nHBR1 = 1; nHBR2 = nHBR1+6;
else
nHBR2 = nHBR0+3;
if nHBR2 > params.PcTable.HBRnum
nHBR2 = params.PcTable.HBRnum; nHBR1 = nHBR2-6;
end
end
end
end
% Get or interpolate the Pc value for the new HBR from the Pc table
Ncol0 = params.PcTable.OriginalDBColumns;
if HBR_on_grid
% Get Pc values from table previously stored in DB array
Pcnew(:) = out.ConjDist.DB(:,Ncol0+nHBR0);
else
% Interpolate Pc values from table previously stored in DB
nHBR = nHBR1:nHBR2;
iHBR = Ncol0+nHBR;
for nc=1:Nconj
% Linear interpolation if any of the local grid Pc values
% are zero, otherwise logarithmic interpolation
if any(out.ConjDist.DB(nc,iHBR) == 0)
Pcnew(nc) = interp1(params.PcTable.HBR(nHBR), ...
out.ConjDist.DB(nc,iHBR), ...
params.mission_HBR_meters);
else
Pcnew(nc) = 10^interp1(params.PcTable.log10HBR(nHBR), ...
log10(out.ConjDist.DB(nc,iHBR)), ...
log10HBRnew);
end
end
end
end
% Insert the new HBR and Pc into the DB array
out.ConjDist.DB(:,157) = params.mission_HBR_meters;
out.ConjDist.DB(:,156) = Pcnew;
clear Pcnew;
%% Create a list of events
logstr = [current_timestring() ...
' Defining output list of associated conjunction events'];
log_string(params.logfid,logstr,params.logging,params.displaying);
% Open and initialize CSV output file listing all associated events
if params.make_event_file
csv_file_root = ['Events_' params.prisetstr '_Ne' num2str(Nevent)];
if params.timestamp
csv_file_root = [csv_file_root '_' params.timetag];
end
csv_file_name = fullfile(params.outputdir,[csv_file_root '.csv']);
csvfid = fopen(csv_file_name,'wt');
csvfmt = '%0.17g';
outstr = 'Primary';
outstr = [outstr ', ' 'Secondary'];
outstr = [outstr ', ' 'Nupdate'];
outstr = [outstr ', ' 'medTCA'];
outstr = [outstr ', ' 'maxdelTCA'];
if ~using_PcTable
outstr = [outstr ', ' 'NCAinSV'];
outstr = [outstr ', ' 'NLTinSV'];
end
outstr = [outstr ', ' 'minPc'];
outstr = [outstr ', ' 'maxPc'];
outstr = [outstr ', ' 'medPc'];
outstr = [outstr ', ' 'fudPc'];
outstr = [outstr ', ' 'ludPc'];
outstr = [outstr ', ' 'ludAge'];
outstr = [outstr ', ' 'ludUse'];
outstr = [outstr ', ' 'mudPc'];
outstr = [outstr ', ' 'mudAge'];
outstr = [outstr ', ' 'mudUse'];
outstr = [outstr ', ' 'minHBR'];
outstr = [outstr ', ' 'maxHBR'];
fprintf(csvfid,'%s\n',outstr);
end
% Allocate arrays for event processing
out.ConjDist.Pri = NaN(Nevent,1);
out.ConjDist.Sec = NaN(Nevent,1);
out.ConjDist.TCAfud = NaN(Nevent,1);
out.ConjDist.TCAlud = NaN(Nevent,1);
out.ConjDist.TCAmud = NaN(Nevent,1);
out.ConjDist.TCAmin = NaN(Nevent,1);
out.ConjDist.TCAmax = NaN(Nevent,1);
out.ConjDist.Pcmin = NaN(Nevent,1);
out.ConjDist.Pcmax = NaN(Nevent,1);
out.ConjDist.Pcmed = NaN(Nevent,1);
out.ConjDist.Pcfud = NaN(Nevent,1);
out.ConjDist.Pclud = NaN(Nevent,1);
out.ConjDist.Pcmud = NaN(Nevent,1);
out.ConjDist.AGElud = NaN(Nevent,1);
out.ConjDist.USElud = NaN(Nevent,1);
out.ConjDist.AGEmud = NaN(Nevent,1);
out.ConjDist.USEmud = NaN(Nevent,1);
out.ConjDist.HBRmin = NaN(Nevent,1);
out.ConjDist.HBRmax = NaN(Nevent,1);
if ~using_PcTable
out.ConjDist.NCAin = zeros(Nevent,1);
out.ConjDist.NLTin = zeros(Nevent,1);
end
% Parameters usage of CArate_in_screen function
clear CApr;
CApr.screen_type = params.SVRICtype_alt;
% Perform event processing
N_tinyRCSorSpeed = 0;
N_noncatastrophic = 0;
M_noncatastrophic = [];
for ne=1:Nevent
% Indices for this event's update sequence
ndx0 = (ne == out.ConjDist.event);
ndx = find(ndx0);
Nndx = numel(ndx);
% Primary and secondary for this event
p = out.ConjDist.DB(ndx(1),1); out.ConjDist.Pri(ne) = p;
s = out.ConjDist.DB(ndx(1),2); out.ConjDist.Sec(ne) = s;
% Index array for this primary
pdx = (params.priset == p);
% Parameters array for usage of CArate_in_screen for screening volume
% incursions
CApr.screen_dimensions = params.SVRICdims_m(pdx,:);
CApr.screen_max_r = max(CApr.screen_dimensions);
CApr.screen_max_r2 = CApr.screen_max_r^2;
CApr.screen_ratios = CApr.screen_dimensions / ...
CApr.screen_max_r;
CApr.Cnorm = diag(CApr.screen_ratios.^(-2));
if ~strcmpi(params.SVRICtype,'box')
aaa = params.SVRICdims_m(pdx,1);
bbb = params.SVRICdims_m(pdx,2);
ccc = params.SVRICdims_m(pdx,3);
aaa2 = aaa^2;
bbb2 = bbb^2;
ccc2 = ccc^2;
end
% TCA for this events update sequence
TCAndx = out.ConjDist.DB(ndx,166);
TCAmedcheck = median(TCAndx);
if (out.ConjDist.TCAmed(ne) ~= TCAmedcheck)
error('Median TCA mismatch');
end
out.ConjDist.TCAmin(ne) = min(TCAndx);
out.ConjDist.TCAmax(ne) = max(TCAndx);
TCRndx = out.ConjDist.DB(ndx,165);
HBRndx = out.ConjDist.DB(ndx,157);
if any(HBRndx ~= params.mission_HBR_meters)
error('HBR mismatch found');
end
% Calculate Pc values
Pcndx = out.ConjDist.DB(ndx,156);
% Clip small Pc values
Pcndx(Pcndx <= 1e-300) = 0;
% Min/max HBR values
out.ConjDist.HBRmin(ne) = min(HBRndx);
out.ConjDist.HBRmax(ne) = max(HBRndx);
% First Pc update in sequence
[~,imin] = min(TCRndx);
out.ConjDist.TCAfud(ne) = TCAndx(imin);
out.ConjDist.Pcfud(ne) = Pcndx(imin);
% Find conjunctions in Pc update sequence within the commit and
% consider times
TCAmTCR = TCAndx-TCRndx;
InCommitConsider = (TCAmTCR <= max(params.CommitConsiderDays)) & ...
(TCAmTCR >= min(params.CommitConsiderDays));
if any(InCommitConsider)
% Find updates found within specified limits
InCommitConsider = find(InCommitConsider);
% Indicate this event's last-update and max-update Pc values can be
% used because they are within the consider/commit time limits
out.ConjDist.USElud(ne) = 1;
out.ConjDist.USEmud(ne) = 1;
% Index of last-update in this event's conjunction list
[out.ConjDist.AGElud(ne),ilud] = min(TCAmTCR(InCommitConsider));
ilud = InCommitConsider(ilud);
% Index of max Pc value in this events conjunction list
[~,imud] = max(Pcndx(InCommitConsider));
imud = InCommitConsider(imud);
out.ConjDist.AGEmud(ne) = TCAmTCR(imud);
% Check for catastrophic status of last-update conjunction, if
% required
if params.exclude_noncatastrophic
if PcLUDvsPcMaxOption == 1
nc = ndx(ilud); % Index of last-update in DB conjunction list
elseif PcLUDvsPcMaxOption == 2
nc = ndx(imud); % Index of max Pc in DB conjunction list
else
error('Invalid PcLUDvsPcMaxOption for exclude_noncatastrophic = true');
end
tinyRCS = 1e-12;
SecRCS = out.ConjDist.DB(nc,114);
RelSpeed = out.ConjDist.DB(nc,20);
if (SecRCS < tinyRCS) || (RelSpeed <= 0)
% Zero or tiny secondary RCS values cannot be used to
% evaluate chance of non-catastophic collision
N_tinyRCSorSpeed = N_tinyRCSorSpeed+1;
else
% Estimate catastophic events using collision consequence
% method
[Catastrophic,~,massVec] = ...
CollisionConsequenceOCMDBReader(out.ConjDist.DB(nc,:), ...
params.mission_on_orbit_mass_kg);
ChanceNonCatastrophic = 1-sum(Catastrophic)/length(Catastrophic);
if ChanceNonCatastrophic > params.confidence_noncatastrophic
% Do not use high-confidence noncatastrophic collisions
if PcLUDvsPcMaxOption == 1
out.ConjDist.USElud(ne) = 0;
elseif PcLUDvsPcMaxOption == 2
out.ConjDist.USEmud(ne) = 0;
end
N_noncatastrophic = N_noncatastrophic+1;
M_noncatastrophic = cat(1,M_noncatastrophic,median(massVec));
end
end
end
else
% No updates found within specified limits
% This events's last-update Pc can't be used
out.ConjDist.USElud(ne) = 0;
[out.ConjDist.AGElud(ne),ilud] = min(TCAmTCR);
% This events's max Pc can't be used
out.ConjDist.USEmud(ne) = 0;
[~,imud] = max(Pcndx);
out.ConjDist.AGEmud(ne) = TCAmTCR(imud);
end
% Last update and max-Pc update Pc values and TCAs
out.ConjDist.Pclud(ne) = Pcndx(ilud);
out.ConjDist.TCAlud(ne) = TCAndx(ilud);
out.ConjDist.Pcmud(ne) = Pcndx(imud);
out.ConjDist.TCAmud(ne) = TCAndx(imud);
% Median TCA string
TCAmedstr = round_timestring(jd_to_timestring(JD0+out.ConjDist.TCAmed(ne)),'s');
dTCAmax = max(abs([out.ConjDist.TCAmin(ne)-out.ConjDist.TCAmed(ne) ...
out.ConjDist.TCAmax(ne)-out.ConjDist.TCAmed(ne)]));
dTCAmaxstr = num2str(86400*dTCAmax,'%+0.3f');
out.ConjDist.Pcmin(ne) = min(Pcndx);
out.ConjDist.Pcmax(ne) = max(Pcndx);
out.ConjDist.Pcmed(ne) = median(Pcndx);
% Calculate RIC screening volume penetrations for all conjunction updates
if ~using_PcTable
% Use state info in DB to determine number of close-approach points
% and linear-trajectories that are within the screening volume
for nn=1:Nndx
% Index for this conjunction update
n = ndx(nn);
% Get the secondary's state in the primary's RIC frame at TCA.
% Calculate the secondary's position in the primary's RIC frame
pos1 = out.ConjDist.DB(n,172:174)*1e3; % ECI primary pos & vel
vel1 = out.ConjDist.DB(n,175:177)*1e3;
pos2 = out.ConjDist.DB(n,178:180)*1e3; % TDR secondary pos & vel
vel2 = out.ConjDist.DB(n,181:183)*1e3;
h = cross(pos1,vel1);
rhat = pos1 / norm(pos1);
chat = h / norm(h);
ihat = cross(chat,rhat);
ECItoRIC = [rhat; ihat; chat];
% Cross check for low- vs high-precision
rs = ECItoRIC * (pos2-pos1)';
vs = ECItoRIC * (vel2-vel1)';
% Determine if the CA point and/or the linearized trajectory (LT)
% penetrates the RIC screening volume
[CA_in_SV, LT_in_SV] = CArate_in_screen( ...
CApr.screen_max_r, CApr.screen_max_r2, true, ...
rs, vs, CApr);
% Cross check for ellipsoidal SV
if ~strcmpi(params.SVRICtype,'box')
% Ellipsoid cross-check code 1
qqq1 = rs;
sca1 = qqq1(1)/aaa; sca2 = qqq1(2)/bbb; sca3 = qqq1(3)/ccc;
fca = sca1^2 + sca2^2 + sca3^2 - 1;
CAin = fca <= 0;
ttop = ( rs(1)*vs(1)/aaa2 + ...
rs(2)*vs(2)/bbb2 + ...
rs(3)*vs(3)/ccc2 );
tbot = ( vs(1)*vs(1)/aaa2 + ...
vs(2)*vs(2)/bbb2 + ...
vs(3)*vs(3)/ccc2 );
ttt0 = -ttop/tbot;
qqq0 = rs + ttt0*vs;
slt1 = qqq0(1)/aaa; slt2 = qqq0(2)/bbb; slt3 = qqq0(3)/ccc;
flt = slt1^2 + slt2^2 + slt3^2 - 1;
LTin = flt <= 0;
if (CA_in_SV ~= CAin) || (LT_in_SV ~= LTin)
% keyboard;
error('Screening ellipsoid cross check 1 failed');
end
% Ellipsoid cross-check code 2
sigRIC = [aaa; bbb; ccc];
rr = rs./sigRIC;
vv = vs./sigRIC;
AA = sum(vv.^2);
BB = 2*sum(rr.*vv);
CC = sum(rr.^2)-1;
ca_in_sv = CC < 0;
lt_in_sv = BB^2-4*AA*CC > 0;
if (ca_in_sv ~= CA_in_SV) || (lt_in_sv ~= LT_in_SV)
% keyboard;
error('Screening ellipsoid cross check 1 failed');
end
end
out.ConjDist.NCAin(ne) = out.ConjDist.NCAin(ne) + CA_in_SV;
out.ConjDist.NLTin(ne) = out.ConjDist.NLTin(ne) + LT_in_SV;
end
end
% Output results
if params.make_event_file
outstr = num2str(p,'%05i');
outstr = [outstr ', ' num2str(s,'%05i')];
outstr = [outstr ', ' num2str(Nndx)];
outstr = [outstr ', ' TCAmedstr];
outstr = [outstr ', ' dTCAmaxstr];
if ~using_PcTable
outstr = [outstr ', ' num2str(out.ConjDist.NCAin(ne))];
outstr = [outstr ', ' num2str(out.ConjDist.NLTin(ne))];
end
outstr = [outstr ', ' num2str(out.ConjDist.Pcmin(ne),csvfmt)];
outstr = [outstr ', ' num2str(out.ConjDist.Pcmax(ne),csvfmt)];
outstr = [outstr ', ' num2str(out.ConjDist.Pcmed(ne),csvfmt)];
outstr = [outstr ', ' num2str(out.ConjDist.Pcfud(ne),csvfmt)];
outstr = [outstr ', ' num2str(out.ConjDist.Pclud(ne),csvfmt)];
outstr = [outstr ', ' num2str(out.ConjDist.AGElud(ne),csvfmt)];
outstr = [outstr ', ' num2str(out.ConjDist.USElud(ne))];
outstr = [outstr ', ' num2str(out.ConjDist.Pcmud(ne),csvfmt)];
outstr = [outstr ', ' num2str(out.ConjDist.AGEmud(ne),csvfmt)];
outstr = [outstr ', ' num2str(out.ConjDist.USEmud(ne))];
outstr = [outstr ', ' num2str(out.ConjDist.HBRmin(ne),csvfmt)];
outstr = [outstr ', ' num2str(out.ConjDist.HBRmax(ne),csvfmt)];
fprintf(csvfid,'%s\n',outstr);
end
% Make update plot for this event if required
make_event_update_plot = false;
if params.make_update_plots
if PcLUDvsPcMaxOption == 1
% For latest update option, ensure the LUD is within the usable
% age range, and the LUD Pc value is sufficiently large
make_event_update_plot = ...
(out.ConjDist.USElud(ne) == 1) & ...
(out.ConjDist.Pcmax(ne) >= params.Pc_for_update_plots);
elseif PcLUDvsPcMaxOption == 2
% For max-Pc option, ensure the MUD is within the usable
% age range, and the MUD Pc value is sufficiently large
make_event_update_plot = ...
(out.ConjDist.USEmud(ne) == 1) & ...
(out.ConjDist.Pcmax(ne) >= params.Pc_for_update_plots);
else
% Ensure that there are enough updates and that the max Pc
% value is sufficiently large
make_event_update_plot = ...
(Nndx >= params.Nu_for_update_plots) & ...
(out.ConjDist.Pcmax(ne) >= params.Pc_for_update_plots);
end
end
if make_event_update_plot
% ID strings for earliest and latest updates
[~,jmin] = min(TCRndx);
nc = ndx(jmin);
id1 = sprintf(['%05i%s%05i%s%04i%02i%02i%s%02i' ...
'%02i%02i%s%04i%02i%02i%s%02i%02i%02i'], ...
out.ConjDist.DB(nc,1),'_conj_',out.ConjDist.DB(nc,2),'_', ...
out.ConjDist.DB(nc,12:14),'_',out.ConjDist.DB(nc,15:17),'_', ...
out.ConjDist.DB(nc,3:5),'_',out.ConjDist.DB(nc,6:8));
[~,jmax] = max(TCRndx);
nc = ndx(jmax);
id2 = sprintf(['%05i%s%05i%s%04i%02i%02i%s%02i' ...
'%02i%02i%s%04i%02i%02i%s%02i%02i%02i'], ...
out.ConjDist.DB(nc,1),'_conj_',out.ConjDist.DB(nc,2),'_', ...
out.ConjDist.DB(nc,12:14),'_',out.ConjDist.DB(nc,15:17),'_', ...
out.ConjDist.DB(nc,3:5),'_',out.ConjDist.DB(nc,6:8));
% Construct title
nti = 0; clear titl;
nti=nti+1; titl{nti} = 'Collision Probability Updates';
nti=nti+1; titl{nti} = strrep(id1,'_','\_');
nti=nti+1; titl{nti} = strrep(id2,'_','\_');
nti=nti+1; titl{nti} = ['Pc values estimated using HBR = ' ...
num2str(params.mission_HBR_meters) ' m'];
if PcLUDvsPcMaxOption == 1
nti=nti+1;
titl{nti} = ['Last update ' num2str(min(params.CommitConsiderDays)) ...
' to ' num2str(max(params.CommitConsiderDays)) ...
' days before TCA: Pc = ' smart_exp_format(out.ConjDist.Pclud(ne),3)];
elseif PcLUDvsPcMaxOption == 2
nti=nti+1;
titl{nti} = ['Max-Pc update ' num2str(min(params.CommitConsiderDays)) ...
' to ' num2str(max(params.CommitConsiderDays)) ...
' days before TCA: Pc = ' smart_exp_format(out.ConjDist.Pcmud(ne),3)];
end
nti=nti+1; titl{nti} = ' ';
% Make update plot
fighandle1 = ConjDist_update_plot(titl, ...
out.ConjDist.TCAlud(ne),TCRndx,Pcndx,params,fighandle1);
plt_file_root = [id2 '_Nupdate' num2str(Nndx)];
plt_file_name = fullfile(params.outputdir,[plt_file_root params.plot_format]);
saveas(fighandle1,plt_file_name);
end
end
if params.exclude_noncatastrophic && (N_noncatastrophic > 0)
logstr = [current_timestring() ...
' (SecRCS < ' smart_exp_format(tinyRCS,3) ...
') or (RelSpeed <= 0) events counted: ' ...
num2str(N_tinyRCSorSpeed) ' out of ' num2str(Nevent)];
log_string(params.logfid,logstr,params.logging,params.displaying);
logstr = [' ' num2str(params.confidence_noncatastrophic*100) '%-likely' ...
' noncatastrophic events counted: ' num2str(N_noncatastrophic) ...
' out of ' num2str(Nevent)];
log_string(params.logfid,logstr,params.logging,params.displaying);
if N_noncatastrophic > 0
logstr = [' Min/med/max sec. mass for likely non-cat. events = ' ...
num2str(min(M_noncatastrophic)) '/' ...
num2str(median(M_noncatastrophic)) '/' ...
num2str(max(M_noncatastrophic)) ' kg'];
log_string(params.logfid,logstr,params.logging,params.displaying);
end
end
% Close the figure and the csv file
if ishandle(fighandle1); delete(fighandle1); end
if params.make_event_file; fclose(csvfid); end
% Make repeating event file (turned off for EventRate version)
if params.make_repeating_event_file
% Generate the repeating events
[repev] = find_repeating_events(csv_file_name,out.ConjDist.DB,params);
end
% Issue warning if any HBR changes were detected
HBRminall = min(out.ConjDist.HBRmin);
HBRmaxall = max(out.ConjDist.HBRmax);
if (HBRminall ~= HBRmaxall)
wrnstr = ['HBR changes occurred during time span:' ...
' minHBR = ' num2str(HBRminall) ...
' maxHBR = ' num2str(HBRmaxall)];
logstr = [current_timestring() ...
' WARNING: ' wrnstr];
log_string(params.logfid,logstr,params.logging,params.displaying);
warning(wrnstr);
end
%% Time span covered by the associated conjunction events
out.ConjDist.TCAmin = minTCAmed;
out.ConjDist.TCAmax = maxTCAmed;
out.ConjDist.TCAdelt = maxTCAmed-minTCAmed;
logstr = [current_timestring() ....
' Time spanned by the associated event median TCA values: ' ...
num2str(out.ConjDist.TCAdelt) ' days'];
log_string(params.logfid,logstr,params.logging,params.displaying);
% Generate the output TCA bins
if params.make_time_bins
% Bin width
Wbin = params.TCAbin_days;
% Calculate the number of bins. Use floor here to prevent the
% possiblity of an underfilled last bin
out.ConjDist.bins.Nbin = floor((out.ConjDist.TCAlimits(2)-out.ConjDist.TCAlimits(1))/Wbin);
out.ConjDist.bins.Tbinlo = out.ConjDist.TCAlimits(1)+params.TCAbin_days*(0:out.ConjDist.bins.Nbin-1);
out.ConjDist.bins.Tbinhi = out.ConjDist.bins.Tbinlo+Wbin;
out.ConjDist.bins.Tbinhi(out.ConjDist.bins.Nbin) = ...
max(out.ConjDist.bins.Tbinhi(out.ConjDist.bins.Nbin),out.ConjDist.TCAlimits(2));
out.ConjDist.bins.Tbin = (out.ConjDist.bins.Tbinhi+out.ConjDist.bins.Tbinlo)/2;
end
%% Report and plot all registered events and yellow/red events, as required
%
% The can comprise three sets:
% 1) the entire set of associated conjunction events
% 2) the subset representing primary SVI incursions
% 3) the complementary subset not representing primary SVI incursions
%
% The EventRate version of ConjDist only uses set 1, and the other two are
% just turned off, rather than eliminated
out.ConjDist.Nall = NaN(3,1);
out.ConjDist.Nyel = NaN(3,1);
out.ConjDist.Nred = NaN(3,1);
out.ConjDist.rates.all.md = NaN(3,1);
out.ConjDist.rates.all.lo = NaN(3,1);
out.ConjDist.rates.all.hi = NaN(3,1);
out.ConjDist.rates.yel.md = NaN(3,1);
out.ConjDist.rates.yel.lo = NaN(3,1);
out.ConjDist.rates.yel.hi = NaN(3,1);
out.ConjDist.rates.red.md = NaN(3,1);
out.ConjDist.rates.red.lo = NaN(3,1);
out.ConjDist.rates.red.hi = NaN(3,1);
out.ConjDist.fracs.yel.md = NaN(3,1);
out.ConjDist.fracs.yel.lo = NaN(3,1);
out.ConjDist.fracs.yel.hi = NaN(3,1);
out.ConjDist.fracs.red.md = NaN(3,1);
out.ConjDist.fracs.red.lo = NaN(3,1);
out.ConjDist.fracs.red.hi = NaN(3,1);
if params.make_time_bins
out.ConjDist.rates.binall.md = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.rates.binall.lo = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.rates.binall.hi = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.rates.binyel.md = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.rates.binyel.lo = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.rates.binyel.hi = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.rates.binred.md = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.rates.binred.lo = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.rates.binred.hi = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.fracs.binyel.md = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.fracs.binyel.lo = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.fracs.binyel.hi = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.fracs.binred.md = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.fracs.binred.lo = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.fracs.binred.hi = NaN(3,out.ConjDist.bins.Nbin);
out.ConjDist.rates.bavgall.md = NaN(3,1);
out.ConjDist.rates.bavgall.lo = NaN(3,1);
out.ConjDist.rates.bavgall.hi = NaN(3,1);
out.ConjDist.rates.bavgyel.md = NaN(3,1);
out.ConjDist.rates.bavgyel.lo = NaN(3,1);
out.ConjDist.rates.bavgyel.hi = NaN(3,1);
out.ConjDist.rates.bavgred.md = NaN(3,1);
out.ConjDist.rates.bavgred.lo = NaN(3,1);
out.ConjDist.rates.bavgred.hi = NaN(3,1);
out.ConjDist.fracs.bavgyel.md = NaN(3,1);
out.ConjDist.fracs.bavgyel.lo = NaN(3,1);
out.ConjDist.fracs.bavgyel.hi = NaN(3,1);
out.ConjDist.fracs.bavgred.md = NaN(3,1);
out.ConjDist.fracs.bavgred.lo = NaN(3,1);
out.ConjDist.fracs.bavgred.hi = NaN(3,1);
end
% If last-update option, then only process full set - not those that are
% screening volume incursions (SVI), or non-SVIs
if PcLUDvsPcMaxOption > 0
nset2 = 1;
else
if using_PcTable
nset2 = 1;
else
nset2 = 3;
end
end
% Process up to three unique event sets
% nset = 1 => All events
% nset = 2 => Screening volume incursion (SVI) events
% nset = 3 => NonSVI events
for nset=1:nset2
if nset == 1
eset = true(size(out.ConjDist.Pclud));
setstr = 'Number of unique events';
plt_file_root0 = 'All';
elseif nset == 2
eset = out.ConjDist.NLTin > 0;
setstr = 'SVI events';
plt_file_root0 = 'SVI';
else
eset = out.ConjDist.NLTin == 0;
setstr = 'Non-SVI events';
plt_file_root0 = 'NonSVI';
end
% Number of all events in this set
Nall = sum(eset);
setstr = [setstr ': ' num2str(Nall)];
titstr = setstr;
% Perform processing specifically for the comprehensive set 'All'
if (nset == 1)
% Last-update option can have RMM rates calculatd
if PcLUDvsPcMaxOption > 0
if params.exclude_noncatastrophic
excatstr = '/catastrophic';
else
excatstr = '';
end
clear titstrnew;
titstrnew{1} = titstr;
if PcLUDvsPcMaxOption == 1
titstrnew{2} = ['(within RMM commit/consider' excatstr ...
' time limits: ' num2str(sum(out.ConjDist.USElud)) ')'];
elseif PcLUDvsPcMaxOption == 2
titstrnew{2} = ['(within RMM commit/consider' excatstr ...
' time limits: ' num2str(sum(out.ConjDist.USEmud)) ')'];
else
titstrnew{2} = ' ';
end
titstr = titstrnew;
end
else
[p0,dp] = ConjDist_binofit(Nall,Nevent);
[pmd,plo,phi] = smart_error_range(100*p0,100*dp(1),100*dp(2));
setstr = [setstr '/' num2str(Nevent)];
setstr = [setstr ' = ' pmd '% (95% conf: ' plo '% to ' phi '%)'];
titstr = [titstr '/' num2str(Nevent) ' = ' pmd ...
'% (' plo '% to ' phi '%)'];
if (nset == 2)
out.ConjDist.fracs.svi.md = p0;
out.ConjDist.fracs.svi.lo = dp(1);
out.ConjDist.fracs.svi.hi = dp(2);
else
out.ConjDist.fracs.nosvi.md = p0;
out.ConjDist.fracs.nosvi.lo = dp(1);
out.ConjDist.fracs.nosvi.hi = dp(2);
end
end
logstr = [current_timestring() ' ' setstr];
log_string(params.logfid,logstr,params.logging,params.displaying);
% Median TCA for events in this set
Tcset = out.ConjDist.TCAmed(eset);
% Pc valaues for events in this set
switch params.redyel_event_option
case 'max'
Pcset = out.ConjDist.Pcmax(eset);
case 'min'
Pcset = out.ConjDist.Pcmin(eset);
case 'med'
Pcset = out.ConjDist.Pcmed(eset);
case 'fud'
Pcset = out.ConjDist.Pcfud(eset);
case 'lud'
Pcset = out.ConjDist.Pclud(eset);
case 'mud'
Pcset = out.ConjDist.Pcmud(eset);
otherwise
error('Invalid redyel_event_option parameter');
end
yel = Pcset >= params.Pcyel;
Nyel = sum(yel);
[myel,ryel] = ConjDist_binofit(Nyel,Nall);
red = Pcset >= params.Pcred;
Nred = sum(red);
[mred,rred] = ConjDist_binofit(Nred,Nall);
% Make altitude-latitude distribution plots
if (params.make_altlat_plots(nset) ~= 0) && any(eset)
% Set-specific processing
if nset == 1
% Initialize plot ranges and name root
xrng0 = []; yrng0 = []; zrng0 = [];
plt_file_root = 'All';
% Crate plot title
nti = 0; titlPlot = cell(1,100);
nti = nti+1;
if Npri == 1
titlPlot{nti} = params.prisetstr;
else
titlPlot{nti} = strrep(params.prisetstr,'_',' ');
end
titlPlot{nti} = ['Orbit: ' titlPlot{nti} ' (' ...
num2str(round(mdper)) 'km x ' ...
num2str(round(mdapo)) 'km x ' ...
num2str(round(mdinc)) 'deg'];
if isfield(params,'priorb')
if ~isempty(params.priorb)
titlPlot{nti} = [titlPlot{nti} ' in ' params.priorb ')'];
end
else
titlPlot{nti} = [titlPlot{nti} ')'];
end
nti=nti+1; titlPlot{nti} = ...
['Interval: ' minTCA ' to ' maxTCA ...
' (' num2str(delTCA_yr,'%0.2f') ' yr)'];
nti=nti+1; titlPlot{nti} = ['Commit/consider time limits: ' ...
num2str(min(params.CommitConsiderDays)) ' to ' ...
num2str(max(params.CommitConsiderDays)) ' day'];
if PcLUDvsPcMaxOption > 0
nti = nti+1;
if params.exclude_noncatastrophic
titlPlot{nti} = ['Likely non-catastrophic events: Excluded (M = ' ...
smart_exp_format(params.mission_on_orbit_mass_kg,3) ' kg)'];
else
titlPlot{nti} = 'Likely non-catastrophic events: Included';
end
end
if PcLUDvsPcMaxOption == 1
nti=nti+1; titlPlot{nti} = ['Unique events: ' ...
num2str(sum(out.ConjDist.USElud)) ' of ' num2str(Nall)];
elseif PcLUDvsPcMaxOption == 2
nti=nti+1; titlPlot{nti} = ['Unique events: ' ...
num2str(sum(out.ConjDist.USEmud)) ' of ' num2str(Nall)];
else
nti=nti+1; titlPlot{nti} = ' ';
end
if PcLUDvsPcMaxOption > 0
if params.exclude_noncatastrophic
titlPlot{nti} = [titlPlot{nti} ...
' in commit/catastrophic limits'];
else
titlPlot{nti} = [titlPlot{nti} ...
' within commit time limits'];
end
end
altlat_title = titlPlot(1:nti);
elseif nset == 2
plt_file_root = 'SVI';
else
plt_file_root = 'NonSVI';
end
% Plot the alt-lat dist in all required plotting modes
malp = params.make_altlat_plots(nset);
if malp > 0
alm1 = 0;
alm2 = min(3,malp-1);
else
alm1 = min(3,abs(malp)-1);
alm2 = alm1;
end
for altlat_mode=alm1:alm2
[xrng0,yrng0,zrng0,fighandle2] = ...
ConjDist_altlat_plot(altlat_mode,PcLUDvsPcMaxOption,eset,altlat_title, ...
xrng0,yrng0,zrng0,out.ConjDist,params,fighandle2);
zstr = num2str(altlat_mode);
if (PcLUDvsPcMaxOption > 0) && ...
(nset == 1) && (altlat_mode == 3)
pfroot = [output_file_root0 ...
'_Dur' num2str(delTCA_yr,'%0.2f') 'yr'];
plt_file_name = [pfroot '_SpatialDist'];
plt_file_name = fullfile(params.outputdir,[plt_file_name params.plot_format]);
else
pfroot = [plt_file_root '_AltLat' zstr '_' ...
params.prisetstr '_Ne' num2str(Nall)];
if params.timestamp
pfroot = [pfroot '_' params.timetag];
end
plt_file_name = fullfile(params.outputdir,[pfroot params.plot_format]);
end
saveas(fighandle2,plt_file_name);
end
end
% Plot LUD age and Pc distribution histograms
if (nset < 3)
if ishandle(fighandle0)
set(0, 'CurrentFigure', fighandle0);
else
if params.visible_plots
vis = 'On';
else
vis = 'Off';
end
fighandle0 = figure_set_up(8.5/11, vis);
end
% Plot LUD age distribution histogram
clf;
AGEdelta = 0.25;
AGEedges = (0:AGEdelta:max(params.CommitConsiderDays));
if PcLUDvsPcMaxOption == 1
USEset = out.ConjDist.USElud(eset);
AGEset = out.ConjDist.AGElud(eset);
else
USEset = out.ConjDist.USEmud(eset);
AGEset = out.ConjDist.AGEmud(eset);
end
USEable = (USEset == 1);
for plt0=1:-1:0
clf;
lgnd = cell(4,1);
hismax = 0;
for icol=0:3
nlg = icol+1;
if icol == 0
if plt0
ndx = USEable;
else
ndx = USEable & (Pcset >= params.Pcgre);
end
fcol = params.rcol; ecol = 0.5*fcol;
idx = ndx & (Pcset >= params.Pcred);
lgnd{nlg} = ['Pc \geq ' smart_exp_format(params.Pcred) ...
' (' num2str(sum(idx)) ' events)'];
elseif icol == 1
ndx = ndx & (Pcset < params.Pcred);
fcol = params.ycol; ecol = 0.5*fcol;
idx = ndx & (Pcset >= params.Pcyel);
lgnd{nlg} = [smart_exp_format(params.Pcyel) ...
' \leq Pc < ' smart_exp_format(params.Pcred) ...
' (' num2str(sum(idx)) ' events)'];
elseif icol == 2
ndx = ndx & (Pcset < params.Pcyel);
fcol = params.gcol; ecol = 0.5*fcol;
idx = ndx & (Pcset >= params.Pcgre);
lgnd{nlg} = [smart_exp_format(params.Pcgre) ...
' \leq Pc < ' smart_exp_format(params.Pcyel) ...
' (' num2str(sum(idx)) ' events)'];
else
ndx = USEable & (Pcset < params.Pcgre);
fcol = (2/3)*[1 1 1]; ecol = 0.5*fcol;
if plt0
lgnd{nlg} = ['Pc < ' smart_exp_format(params.Pcgre) ...
' (' num2str(sum(ndx)) ' events)'];
else
lgnd{nlg} = ['Pc < ' smart_exp_format(params.Pcgre) ...
' (' num2str(sum(ndx)) ' events, not plotted)'];
ndx = [];
end
end
his = histogram(AGEset(ndx),AGEedges, ...
'EdgeColor',ecol,'EdgeAlpha',1, ...
'FaceColor',fcol,'FaceAlpha',1);
hismax = max(hismax,max(his.Values));
hold on;
end
% Plot vertical lines at the remediation maneuver commit time
% limits
xrng = [0 max(params.CommitConsiderDays)+AGEdelta];
yrng = [0 max(hismax+1,round(1.05*hismax))];
if PcLUDvsPcMaxOption > 0
lsty = ':';
lcol = 'k';
for nn=1:numel(params.CommitConsiderDays)
plot([params.CommitConsiderDays(nn) params.CommitConsiderDays(nn)],yrng, ...
'LineStyle',lsty,'LineWidth',2, ...
'Color',lcol);
end
end
hold off;
xlim(xrng); ylim(yrng);
xlabel('Last Update Age (days)','FontSize',xfsz,'FontWeight',xfwt);
ylabel('Frequency','FontSize',yfsz,'FontWeight',yfwt);
clear ttl;
if Npri == 1
ttl{1} = params.prisetstr;
else
ttl{1} = strrep(params.prisetstr,'_',' ');
end
ttl{1} = [ttl{1} ', ' minTCA ' to ' maxTCA];
ttl{2} = ['HBR = ' num2str(HBRminall)];
if (HBRminall ~= HBRmaxall)
ttl{2} = [ttl{2} '-' num2str(HBRmaxall)];
end
ttl{2} = [ttl{2} ' m, Commit/Consider Times = ' num2str(min(params.CommitConsiderDays)) ...
' to ' num2str(max(params.CommitConsiderDays)) ' days'];
ttl1 = ttl;
title(ttl,'FontSize',tfsz,'FontWeight',tfwt,'FontAngle',tfan);
legend(lgnd,'Location','NorthOutside', ...
'FontSize',afsz,'FontWeight',afwt);
legend('boxoff');
set(gca,'FontSize',afsz,'FontWeight',afwt,'LineWidth',alwd);
if plt0 == 0
cnjpltstr = '_SIG';
else
cnjpltstr = '_ALL';
end
if (PcLUDvsPcMaxOption > 0) && (nset == 1)
plt_file_name = fullfile(params.outputdir, ...
[output_file_root '_LastUpdateDist' cnjpltstr ...
params.plot_format]);
else
plt_file_root = [plt_file_root0 '_AGE_' ...
params.prisetstr '_Ne' num2str(Nall) cnjpltstr];
if params.timestamp
plt_file_root = [plt_file_root '_' params.timetag];
end
plt_file_name = fullfile(params.outputdir,[plt_file_root params.plot_format]);
end
saveas(fighandle0,plt_file_name);
end
% Perform remediation threshold analysis for the specified
% prospective mission durations
if (PcLUDvsPcMaxOption > 0) && (nset == 1)
Tmissionyrs = params.Tmissionyrs;
Nmissionyrs = numel(Tmissionyrs);
irp0 = cell(Nmissionyrs,1);
NPremImage = params.L10PremImage(3);
L10PremImage = linspace(params.L10PremImage(1), ...
params.L10PremImage(2), ...
NPremImage);
PremImage = 10.^L10PremImage;
NTmisImage = params.TmisImage(3);
TmisImage = linspace(params.TmisImage(1), ...
params.TmisImage(2), ...
NTmisImage);
L10PcmisTable = params.L10PcmisTable;
PcmisTable = 10.^L10PcmisTable;
NPcmisTable = numel(PcmisTable);
irp = cell(NTmisImage,NPcmisTable);
TmisTable = params.TmisTable;
NTmisTable = numel(TmisTable);
else
Nmissionyrs = 0;
end
% Issue an error if Nmissionyrs is not one, which is the expected
if (Nmissionyrs ~= 1)
error('EventRate version of ConjDist requires one single value for Tmissionyrs parameter');
end
% First-generation remediation threshold analysis and plots
% (not done by default for EventRate version)
if params.make_first_generation_plots
% Make a plot of Pcum as a function of Pc
clf;
T0yrs = (maxTCAmed-minTCAmed)/365.25;
Pccut = params.Pc_cutoff_accum_risk;
cut = (Pcset >= Pccut);
if PcLUDvsPcMaxOption > 0
cut = cut & USEset;
end
Ncut = sum(cut);
Tcuse = Tcset(cut);
Pcuse = Pcset(cut);
Pcsrt = sort(Pcuse);
subplot(3,1,1);
lpc = log10(Pcsrt);
msiz = 4;
plot(lpc,(1:Ncut),'x-k','MarkerSize',msiz);
if PcLUDvsPcMaxOption == 1
xlabl = 'Log_{10}(Last-update Pc)';
elseif PcLUDvsPcMaxOption == 2
xlabl = 'Log_{10}(Max-update Pc)';
else
xlabl = ['Log_{10}(Pc,' lower(params.redyel_event_option) ')'];
end
xlabel(xlabl,'FontSize',xfsz,'FontWeight',xfwt);
ylabel('Ncum(Tobs)','FontSize',yfsz,'FontWeight',yfwt);
xrng = [log10(Pccut) 0];
xlim(xrng);
yrng = plot_range([1 Ncut],0.05);
ylim(yrng);
title(ttl1,'FontSize',tfsz,'FontWeight',tfwt,'FontAngle',tfan);
set(gca,'FontSize',afsz,'FontWeight',afwt,'LineWidth',alwd);
% Calculate bootstrapped cumulative Pc values
[Boot] = PcCum_PcRem_BootStrap( ...
T0yrs,Pcuse,Npri,params.Pc_cutoff_accum_risk, ...
Tmissionyrs,[params.Pcmission params.PcRMMexecution], ...
params.N_bootstrap_accum_risk,0.05);
lps = log(1-Pcsrt);
Prat = 1/Npri;
lpscum = cumsum(Prat*lps);
lpccum = log10(1-exp(lpscum));
LPcCumActualInterp = lpccum(end);
subplot(3,1,2);
lpccum0 = lpccum;
plot(lpc,lpccum0,'x-k','MarkerSize',msiz);
xlabel(xlabl,'FontSize',xfsz,'FontWeight',xfwt);
ylabel('Log_{10}[Pcum(Tobs)]','FontSize',yfsz,'FontWeight',yfwt);
xlim(xrng);
yrng = plot_range(lpccum0);
ylim(yrng);
ttl = [];
[~,Pcumstr,~] = smart_exp_format(10^LPcCumActualInterp,2,[false true]);
% [~,Pcummdstr,~] = smart_exp_format(10^Boot.LPcCumActualMedian,2,[false true]);
[~,Pcumlostr,~] = smart_exp_format(10^Boot.LPcCumActualRange(1),2,[false true]);
[~,Pcumhistr,~] = smart_exp_format(10^Boot.LPcCumActualRange(2),2,[false true]);
ttl{1} = ['For the Tobs = ' ...
num2str(T0yrs,'%0.2f') ' yr observation span' ...
' Pcum = ' Pcumstr];
ttl{2} = ['95% resampling range: ' Pcumlostr ...
' \leq Pcum \leq ' Pcumhistr];
title(ttl,'FontSize',tfsz,'FontWeight',tfwt,'FontAngle',tfan);
set(gca,'FontSize',afsz,'FontWeight',afwt,'LineWidth',alwd);
Trat = Tmissionyrs/T0yrs;
lpscum = cumsum(Trat*Prat*lps);
lpccum = log10(1-exp(lpscum));
subplot(3,1,3);
plot(lpc,lpccum,'-k');
xlabel(xlabl,'FontSize',xfsz,'FontWeight',xfwt);
ylabel('Log_{10}[Pcum(Tm)]','FontSize',yfsz,'FontWeight',yfwt);
xlim(xrng);
if PcRemEstimation
lpccumt = log10(params.Pcmission);
lpct = interp1(lpccum,lpc,lpccumt,'linear','extrap');
LPcRemInterp = min(log10(params.Pcmission),lpct);
disp(['LPcrem: ' num2str(LPcRemInterp) ...
' ' num2str(Boot.LPcRemMedian) ...
' ' num2str(Boot.LPcRemRange(1)) ...
' ' num2str(Boot.LPcRemRange(2))]);
disp(['Pcrem: ' smart_exp_format(10^LPcRemInterp,3,[false true]) ...
' ' smart_exp_format(10^Boot.LPcRemMedian,3,[false true]) ...
' ' smart_exp_format(10^Boot.LPcRemRange(1),3,[false true]) ...
' ' smart_exp_format(10^Boot.LPcRemRange(2),3,[false true])]);
yrng = plot_range([min(lpccum) max(lpccum) lpccumt]);
hold on;
plot(LPcRemInterp,lpccumt,'s', ...
'MarkerFaceColor','b','MarkerEdgeColor','b','LineWidth',1);
plot([xrng(1) lpct],[lpccumt lpccumt],'b--');
plot([lpct lpct],[yrng(1) lpccumt],'b--');
ylim(yrng);
ttl = [];
[~,Pcumstr,~] = smart_exp_format(params.Pcmission,2);
[~,Premstr,~] = smart_exp_format(10^LPcRemInterp,2,[false true]);
ttl{1} = ['For a Tm = ' num2str(Tmissionyrs) ' yr mission'];
ttl{1} = [ttl{1} ' Pcum = ' Pcumstr ...
' with Prem = ' Premstr];
[~,Premlostr,~] = smart_exp_format(10^Boot.LPcRemRange(1),2,[false true]);
[~,Premhistr,~] = smart_exp_format(10^Boot.LPcRemRange(2),2,[false true]);
ttl{2} = ['95% resampling range: ' Premlostr ...
' \leq Prem \leq ' Premhistr];
ttl2 = [ttl1 ttl];
else
lpcremt = log10(params.PcRMMexecution);
lpct = interp1(lpc,lpccum,lpcremt,'linear','extrap');
LPcCumInterp = lpct;
disp(['LPcCum: ' num2str(LPcCumInterp) ...
' ' num2str(Boot.LPcCumMedian) ...
' ' num2str(Boot.LPcCumRange(1)) ...
' ' num2str(Boot.LPcCumRange(2))]);
disp(['PcCum: ' smart_exp_format(10^LPcCumInterp,3) ...
' ' smart_exp_format(10^Boot.LPcCumMedian,3) ...
' ' smart_exp_format(10^Boot.LPcCumRange(1),3) ...
' ' smart_exp_format(10^Boot.LPcCumRange(2),3)]);
yrng = plot_range([min(lpccum) max(lpccum) lpct]);
hold on;
plot(lpcremt,LPcCumInterp,'s', ...
'MarkerFaceColor','b','MarkerEdgeColor','b','LineWidth',1);
plot([xrng(1) lpcremt],[lpct lpct],'b--');
plot([lpcremt lpcremt],[yrng(1) lpct],'b--');
ylim(yrng);
ttl = [];
[~,Pcumstr,~] = smart_exp_format(10^LPcCumInterp,2,[false true]);
[~,Premstr,~] = smart_exp_format(params.PcRMMexecution,2);
ttl{1} = ['For a Tm = ' num2str(Tmissionyrs) ' yr mission'];
ttl{1} = [ttl{1} ' Pcum = ' Pcumstr ...
' with Prem = ' Premstr];
[~,Pcumlostr,~] = smart_exp_format(10^Boot.LPcCumRange(1),2,[false true]);
[~,Pcumhistr,~] = smart_exp_format(10^Boot.LPcCumRange(2),2,[false true]);
ttl{2} = ['95% resampling range: ' Pcumlostr ...
' \leq Pcum \leq ' Pcumhistr];
ttl2 = [ttl1 ttl];
end
title(ttl,'FontSize',tfsz,'FontWeight',tfwt,'FontAngle',tfan);
set(gca,'FontSize',afsz,'FontWeight',afwt,'LineWidth',alwd);
clear ttl;
% Construct file name and save plot
plt_file_name = [output_file_root '_Pcum1stGen'];
plt_file_name = fullfile(params.outputdir,[plt_file_name params.plot_format]);
saveas(fighandle0,plt_file_name);
% Make plot of PcRem over a range of Tmission values
if PcRemEstimation && ~isempty(params.Tmissionyrsplot)
BootOrig = Boot;
Tma = params.Tmissionyrsplot(1);
Tmb = params.Tmissionyrsplot(2);
NTm = params.Tmissionyrsplot(3);
LTmyrs = linspace(log10(Tma),log10(Tmb),NTm);
LPcRin = NaN(size(LTmyrs));
LPcRmd = NaN(size(LTmyrs));
LPcRlo = NaN(size(LTmyrs));
LPcRhi = NaN(size(LTmyrs));
for nTm=1:NTm
Tmisyrs = 10^LTmyrs(nTm);
[Boot] = PcCum_PcRem_BootStrap( ...
T0yrs,Pcuse,Npri,params.Pc_cutoff_accum_risk, ...
Tmisyrs,[params.Pcmission params.PcRMMexecution], ...
params.N_bootstrap_accum_risk,0.05,BootOrig.ndxBoot);
LPcRin(nTm) = Boot.LPcRemInterp;
LPcRmd(nTm) = Boot.LPcRemMedian;
LPcRlo(nTm) = Boot.LPcRemRange(1);
LPcRhi(nTm) = Boot.LPcRemRange(2);
end
clf;
Tmyrs = 10.^LTmyrs;
loglog(Tmyrs,10.^LPcRlo,':k','LineWidth',1);
hold on;
plot(Tmyrs,10.^LPcRhi,':k','LineWidth',1);
plot(Tmyrs,10.^LPcRin,'-k','LineWidth',1);
plot(Tmissionyrs,10^LPcRemInterp,'s', ...
'MarkerFaceColor','b','MarkerEdgeColor','b','LineWidth',1);
plot([Tmissionyrs Tmissionyrs], ...
10.^[BootOrig.LPcRemRange(1),BootOrig.LPcRemRange(2)],'b-','LineWidth',2);
hold off;
xlabel('Duration (years)','FontSize',xfsz,'FontWeight',xfwt);
ylabel('RMM Threshold Pc','FontSize',yfsz,'FontWeight',yfwt);
title(ttl2,'FontSize',tfsz,'FontWeight',tfwt,'FontAngle',tfan);
set(gca,'FontSize',afsz,'FontWeight',afwt,'LineWidth',alwd);
xlim(params.Tmissionyrsplot(1:2));
yrng = 10.^plot_range([min(LPcRlo) max(LPcRhi)],0.05);
ylim(yrng);
plt_file_name = [output_file_root '_Prem1stGen'];
plt_file_name = fullfile(params.outputdir,[plt_file_name params.plot_format]);
saveas(fighandle0,plt_file_name);
end
end % End of make_first_generation_plots
% Perform risk remediation analysis
% RMM type can be either translational or rotational
if strcmpi(params.RemManeuver,'Translational')
TransMan = true;
elseif strcmpi(params.RemManeuver,'Rotational')
TransMan = false;
else
error('Invalid RemManuever parameter');
end
% Number of years spanned by observed set of conjunctions
Tobs = (maxTCAmed-minTCAmed)/365.25;
% Limit usage of observed conjunctions to have Pc above the
% specified cutoff value
use = (Pcset >= params.Pc_cutoff_accum_risk);
if PcLUDvsPcMaxOption > 0
use = use & USEset;
end
% Usable observed conjunctions
Nobs = sum(use);
Pcobs = Pcset(use);
% Extract mission and processing parameters
Tmis = Tmissionyrs;
Nboot = params.N_bootstrap_accum_risk;
lnPcunc = params.lnPc_bootstrap_uncertainty;
augevent = params.add_one_unrem_event;
log10PremSearch = params.log10PremSearch;
Reduction = params.RemReduction;
alp95 = (1-0.95)/2;
alp70 = (1-0.70)/2;
% Plot the unmitigated Pcum as a function of Tmission
Tma = min(min(params.Tmissionyrs),TmisImage(1));
Tmb = max(max(params.Tmissionyrs),TmisImage(end));
NTmisArray = NTmisImage;
LTmisArray = linspace(log10(Tma),log10(Tmb),NTmisArray);
TmisArray = 10.^LTmisArray;
if NTmisTable > 0
TmisArray = unique([TmisArray TmisTable params.Tmissionyrs]);
end
NTmisArray = numel(TmisArray);
xrng = [TmisArray(1) TmisArray(end)];
% Calculate unremediated Pcum values
PcummdNoRem = zeros(NTmisArray,1);
PcumloNoRem = zeros(NTmisArray,2);
PcumhiNoRem = zeros(NTmisArray,2);
PcRMMval = 1; % No RMMs performed
parfor n=1:NTmisArray % parfor enabled
Tms = TmisArray(n);
[pnb] = Prem_Nmvr_Bootstrap(Npri, ...
Nobs,Tobs,Pcobs,Tms,SecCatGrowth,TransMan,Reduction, ...
max(1e4,Nboot),[alp70 alp95],lnPcunc,false,PcRMMval,[]);
PcummdNoRem(n) = pnb.Pcummd;
PcumloNoRem(n,:) = pnb.Pcumlo';
PcumhiNoRem(n,:) = pnb.Pcumhi';
end
if PcRemEstimation
% Only make unremediated Pcum plot when estimating Prem
Nplotpass = 1;
yrng = 10.^plot_range( ...
[min(log10(PcumloNoRem(PcumloNoRem > 0))) ...
max(log10(PcumhiNoRem))],0.05);
else
% Make unremediated and rem. Pcum plots when given Prem
Nplotpass = 2;
% Calculate remediated Pcum values
PcummdWithRem = zeros(NTmisArray,1);
PcumloWithRem = zeros(NTmisArray,2);
PcumhiWithRem = zeros(NTmisArray,2);
PcRMMval = params.PcRMMexecution; % RMMs performed
parfor n=1:NTmisArray % parfor enabled
Tms = TmisArray(n);
[pnb] = Prem_Nmvr_Bootstrap(Npri, ...
Nobs,Tobs,Pcobs,Tms,SecCatGrowth,TransMan,Reduction, ...
max(1e4,Nboot),[alp70 alp95],lnPcunc,false,PcRMMval,[]);
PcummdWithRem(n) = pnb.Pcummd;
PcumloWithRem(n,:) = pnb.Pcumlo';
PcumhiWithRem(n,:) = pnb.Pcumhi';
end
yrng = 10.^plot_range( ...
[min(log10(PcumloNoRem(PcumloNoRem > 0))) ...
min(log10(PcumloWithRem(PcumloWithRem > 0))) ...
max(log10(PcumhiNoRem)) ...
max(log10(PcumhiWithRem))],0.05);
end
% Make Pcum Vs Dur plot(s) with one or two passes.
% (This must be done even if Pcum plots are not being made,
% to construct the plot title cell array used later for the RMM
% rate plot.)
for nplotpass=1:Nplotpass
if nplotpass == 1
PcummdPlot = PcummdNoRem;
PcumloPlot = PcumloNoRem;
PcumhiPlot = PcumhiNoRem;
else
PcummdPlot = PcummdWithRem;
PcumloPlot = PcumloWithRem;
PcumhiPlot = PcumhiWithRem;
end
if params.make_Pcum_plots
clf;
loglog(TmisArray,PcummdPlot,'-k','LineWidth',1);
hold on;
% Plot Pcum md,lo,hi curves
% 95% variation range limits
plot(TmisArray,PcumloPlot(:,2),':k','LineWidth',1);
plot(TmisArray,PcumhiPlot(:,2),':k','LineWidth',1);
end
% Overplot the mission Pcum estimates
if ~PcRemEstimation
% When given RMM red-Pc threshold, estimate the
% non-remediated Pcum value
ndx = find(TmisArray == Tmis);
if ~isempty(ndx)
% Mission duration is a member of TmisArray array
n = ndx(end);
PcummdPL = PcummdPlot(n);
PcumloPL = PcumloPlot(n,2);
PcumhiPL = PcumhiPlot(n,2);
else
% Mission duration is not a member of TmisArray, so
% interpolation must be used
ndx = find(TmisArray < Tmis);
if isempty(ndx)
n1 = 1;
else
n1 = min(NTmisArray-1,ndx(end));
end
n2 = n1+1;
LTmis = log10(Tmis);
LTmisArray = log10(TmisArray((n1:n2))');
PcummdPL = 10^interp1(LTmisArray,log10(PcummdPlot(n1:n2)) ,LTmis);
PcumloPL = 10^interp1(LTmisArray,log10(PcumloPlot(n1:n2,2)) ,LTmis);
PcumhiPL = 10^interp1(LTmisArray,log10(PcumhiPlot(n1:n2,2)) ,LTmis);
end
if nplotpass == 1
% Mission Pcum estimates with no RMMs
PcummdNR = PcummdPL;
PcumloNR = PcumloPL;
PcumhiNR = PcumhiPL;
else
% Mission Pcum estimates with RMMs
PcummdWR = PcummdPL;
PcumloWR = PcumloPL;
PcumhiWR = PcumhiPL;
end
if params.make_Pcum_plots
% Plot no-RMM Pcum in blue with vertical error bar
plot(Tmis,PcummdPL,'s', ...
'MarkerFaceColor','b','MarkerEdgeColor','b','LineWidth',1);
plot([Tmis Tmis],[PcumloPL PcumhiPL],'b-','LineWidth',2);
end
end
if params.make_Pcum_plots
hold off;
% Set axes ranges
xlim(xrng); ylim(yrng);
% Overplot grid
grid on;
set(gca,'LineWidth',0.35, ...
'GridLineStyle','-','GridColor',repmat(0.5,[1 3]), ...
'MinorGridLineStyle','-','MinorGridColor',repmat(0.7,[1 3]));
xlabel('On-Orbit Duration (years)','FontSize',xfsz,'FontWeight',xfwt);
ylabel('Cumulative Pc','FontSize',yfsz,'FontWeight',yfwt);
end
% Build titles cell arrays
if nplotpass == 1
% Build title for case with no RMMs performed during
% mission
nti = 0; titlPlot = cell(1,100);
% nti=nti+1; titlPlot{nti} = ' ';
nti=nti+1; titlPlot{nti} = 'Semi-Empirical Cumulative Collision Probability';
nti=nti+1; titlPlot{nti} = ' ';
nti = nti+1;
if Npri == 1
titlPlot{nti} = params.prisetstr;
else
titlPlot{nti} = strrep(params.prisetstr,'_',' ');
end
titlPlot{nti} = ['Orbit: ' titlPlot{nti} ' (' ...
num2str(round(mdper)) 'km x ' ...
num2str(round(mdapo)) 'km x ' ...
num2str(round(mdinc)) 'deg'];
if isfield(params,'priorb')
if ~isempty(params.priorb)
titlPlot{nti} = [titlPlot{nti} ' in ' params.priorb ')'];
end
else
titlPlot{nti} = [titlPlot{nti} ')'];
end
nti=nti+1; titlPlot{nti} = ...
['Interval: ' minTCA ' to ' maxTCA ...
' (' num2str(delTCA_yr,'%0.2f') ' yr)'];
nti=nti+1; titlPlot{nti} = ['Commit/consider time limits: ' ...
num2str(min(params.CommitConsiderDays)) ' to ' ...
num2str(max(params.CommitConsiderDays)) ' day'];
if PcLUDvsPcMaxOption > 0
nti = nti+1;
if params.exclude_noncatastrophic
titlPlot{nti} = ['Likely non-catastrophic events: Excluded (M = ' ...
smart_exp_format(params.mission_on_orbit_mass_kg,3) ' kg)'];
else
titlPlot{nti} = 'Likely non-catastrophic events: Included';
end
end
if PcLUDvsPcMaxOption == 1
nti=nti+1; titlPlot{nti} = ['Unique events: ' ...
num2str(sum(out.ConjDist.USElud)) ' of ' num2str(Nall)];
elseif PcLUDvsPcMaxOption == 2
nti=nti+1; titlPlot{nti} = ['Unique events: ' ...
num2str(sum(out.ConjDist.USEmud)) ' of ' num2str(Nall)];
else
nti=nti+1; titlPlot{nti} = ' ';
end
if PcLUDvsPcMaxOption > 0
if params.exclude_noncatastrophic
titlPlot{nti} = [titlPlot{nti} ...
' in commit/catastrophic limits'];
else
titlPlot{nti} = [titlPlot{nti} ...
' within commit time limits'];
end
end
nti=nti+1; titlPlot{nti} = ' ';
if ~PcRemEstimation
nti=nti+1; titlPlot{nti} = [params.mission_name ...
': duration = ' num2str(Tmissionyrs) ...
' years, HBR = ' num2str(params.mission_HBR_meters) ' m' ...
', growth = ' num2str(SecCatGrowth)];
else
nti=nti+1; titlPlot{nti} = ['Mission hard-body radius: ' ...
num2str(params.mission_HBR_meters) ' m' ...
', Growth = ' num2str(SecCatGrowth)];
end
nti=nti+1; titlPlot{nti} = 'No mission risk mitigation maneuvers (RMMs)';
if ~PcRemEstimation
if PcLUDvsPcMaxOption == 1
out.CumulativePcNoRMMs = [PcummdNR PcumloNR PcumhiNR];
end
nti=nti+1; titlPlot{nti} = ' ';
[~,Pcumstr,~] = smart_exp_format(PcummdNR,2,[false true]);
nti=nti+1; titlPlot{nti} = ['Mission Pc (no RMMs) = ' Pcumstr];
[~,Pcumlostr,~] = smart_exp_format(PcumloNR,2,[false true]);
[~,Pcumhistr,~] = smart_exp_format(PcumhiNR,2,[false true]);
titlPlot{nti} = [titlPlot{nti} ' (95%: ' Pcumlostr ...
' to ' Pcumhistr ')'];
txtclr = '{0 0 1}';
titlPlot{nti} = ['{\color[rgb]' txtclr titlPlot{nti} '}'];
end
nti=nti+1; titlPlot{nti} = ' ';
% Trim title array
titlPlot = titlPlot(1:nti);
PlotStr = 'PcumNoRemVsDur';
if params.make_Pcum_plots
logstr = [current_timestring() ...
' Estimated cumulative Pc values with no mission RMMs:'];
log_string(params.logfid,logstr,params.logging,params.displaying);
end
else
% Output mission Pc with RMMs
if PcLUDvsPcMaxOption == 1
out.CumulativePcWithRMMs = [PcummdWR PcumloWR PcumhiWR];
end
% Build titles for cases of serious-events or with RMMs
% performed during mission
% Replace Pcum (no RMMs) with Pcum (with RMMs)
[~,PremExecutionstr,~] = smart_exp_format(10^L10PremExecution,3);
nti = 10; titlPlot{nti} = ...
['RMM threshold Pc = ' PremExecutionstr...
' (type = ' lower(params.RemManeuver) ...
', \rho = ' num2str(params.RemReduction) ')'];
nti=nti+1; titlPlot{nti} = ' ';
[~,Pcumstr,~] = smart_exp_format(PcummdWR,2,[false true]);
nti=nti+1; titlPlot{nti} = ['Mission Pc (with RMMs) = ' Pcumstr];
[~,Pcumlostr,~] = smart_exp_format(PcumloWR,2,[false true]);
[~,Pcumhistr,~] = smart_exp_format(PcumhiWR,2,[false true]);
titlPlot{nti} = [titlPlot{nti} ' (95%: ' Pcumlostr ...
' to ' Pcumhistr ')'];
txtclr = '{0 0 1}';
titlPlot{nti} = ['{\color[rgb]' txtclr titlPlot{nti} '}'];
% Change the title with RMM remediation (for later use)
titlWiRem = titlPlot;
nti = 10; titlWiRem{nti} = ...
['Serious event threshold Pc = ' PremExecutionstr];
PlotStr = 'PcumWithRemVsDur';
if params.make_Pcum_plots
logstr = [current_timestring() ...
' Estimated cumulative Pc values with mission RMMs:'];
log_string(params.logfid,logstr,params.logging,params.displaying);
end
end
if params.make_Pcum_plots
% Render title
title(titlPlot,'FontSize',tfsz,'FontWeight',tfwt,'FontAngle',tfan);
% Axis fonts
set(gca,'FontSize',afsz,'FontWeight',afwt,'LineWidth',alwd);
% Construct plot file name and save
plt_file_name = [output_file_root '_' PlotStr];
plt_file_name = fullfile(params.outputdir,[plt_file_name params.plot_format]);
saveas(gcf,plt_file_name);
% Report Pcum values
logstr = ' Duration(yrs) Pcum(median) Pcum(95%low) Pcum(95%high)';
log_string(params.logfid,logstr,params.logging,params.displaying);
for n=1:NTmisTable
ndx = TmisTable(n) == TmisArray;
logstr = [ ' ' ...
num2str(TmisTable(n), '%0.3e') ' ' ...
num2str(PcummdPlot(ndx), '%0.3e') ' ' ...
num2str(PcumloPlot(ndx,2),'%0.3e') ' ' ...
num2str(PcumhiPlot(ndx,2),'%0.3e')];
log_string(params.logfid,logstr,params.logging,params.displaying);
end
end
end
% Define the Prem search array (Prem is the RMM Pc threshold)
L10PremSearch = linspace(log10PremSearch(1), ...
log10PremSearch(2), ...
log10PremSearch(3));
if ~PcRemEstimation
% If give RMM Pc, then add it to the search array
L10PremSearch = unique([L10PremSearch ...
L10PremExecution]);
end
% Nsearch = numel(L10PremSearch);
PremSearch = 10.^L10PremSearch;
% Plot x-axis range and label
xrng = [L10PremSearch(1) L10PremSearch(end)];
xlabl = 'Log_{10}(Threshold Pc)';
% Calculate the Prem and Nmvr for a bootstrapped array of
% mission realizations
[pnb] = Prem_Nmvr_Bootstrap(Npri, ...
Nobs,Tobs,Pcobs,Tmis,SecCatGrowth,TransMan,Reduction, ...
Nboot,alp95,lnPcunc,augevent,PremSearch,[]);
rndboot = pnb.rndboot;
Pcummd = pnb.Pcummd;
Pcumlo = pnb.Pcumlo;
Pcumhi = pnb.Pcumhi;
Nmvrmd = pnb.Nmvrmd;
Nmvrlo = pnb.Nmvrlo;
Nmvrhi = pnb.Nmvrhi;
% Make the plot of y = Pcum vs x = Prem
if PcRemEstimation
% This branch for PcRem estimation mode (i.e., given
% mission cumulative Pcum goal, find PcRem and RemRate)
L10Pcummd = log10(Pcummd);
L10Pcumlo = log10(Pcumlo);
L10Pcumhi = log10(Pcumhi);
irp0 = interp_risk_params(L10Pcmission,L10PremSearch, ...
L10Pcummd,L10Pcumlo,L10Pcumhi, ...
Nmvrmd,Nmvrlo,Nmvrhi);
L10Premmd = irp0.L10Premmd;
L10Premlo = irp0.L10Premlo;
L10Premhi = irp0.L10Premhi;
IntNmvrmd = irp0.NmvrmdAchieved;
IntNmvrlo = irp0.NmvrloAchieved;
IntNmvrhi = irp0.NmvrhiAchieved;
L10PcummdAchieved = irp0.L10PcummdAchieved;
L10PcumloAchieved = irp0.L10PcumloAchieved;
L10PcumhiAchieved = irp0.L10PcumhiAchieved;
PcumGoalAchieved = ...
abs(L10PcummdAchieved-L10Pcmission) < 1e-3*L10Pcmission;
% Make the Pcum plot
clf;
% Plot searched solution curves in black
plot(L10PremSearch,L10Pcummd,'k-','LineWidth',1);
hold on;
plot(L10PremSearch,L10Pcumlo,'k:','LineWidth',1);
plot(L10PremSearch,L10Pcumhi,'k:','LineWidth',1);
% Plot the achieved mission-specific solution in blue
plot(L10Premmd,L10PcummdAchieved,'s', ...
'MarkerFaceColor','b','MarkerEdgeColor','b','LineWidth',1);
plot([L10Premhi L10Premlo],[L10PcummdAchieved L10PcummdAchieved],'b-','LineWidth',2);
hold off;
% Axis labels and ranges
if PcLUDvsPcMaxOption > 0
ylabl = 'Log_{10}(Pcum)';
else
ylabl = ['Log_{10}(Pcum,' lower(params.redyel_event_option) ')'];
end
xlabel(xlabl,'FontSize',xfsz,'FontWeight',xfwt);
ylabel(ylabl,'FontSize',yfsz,'FontWeight',yfwt);
yrng = plot_range([L10Pcumlo L10Pcumhi L10Pcmission],0.05);
xlim(xrng); ylim(yrng);
% Build title for PcRemEstimation case
clear ttl;
if Npri == 1
ttl{1} = params.prisetstr;
else
ttl{1} = strrep(params.prisetstr,'_',' ');
end
ttl{1} = [ttl{1} ', ' minTCA ' to ' maxTCA];
ttl{2} = ['HBR = ' num2str(HBRminall)];
if (HBRminall ~= HBRmaxall)
ttl{2} = [ttl{2} '-' num2str(HBRmaxall)];
end
ttl{2} = [ttl{2} ' m, Commit/Consider Times = ' num2str(min(params.CommitConsiderDays)) ...
' to ' num2str(max(params.CommitConsiderDays)) ' days'];
ttl{3} = ['RMM type: ' lower(params.RemManeuver) ...
' (\rho = ' num2str(params.RemReduction) ')'];
[~,Pcmissionstr,~] = smart_exp_format(10^L10Pcmission,2,[false true]);
ttl{4} = ['Tmis = ' num2str(Tmissionyrs) 'yr, '...
'Pcum goal = ' Pcmissionstr];
[~,PcummdAchievedstr,~] = smart_exp_format(10^L10PcummdAchieved,2,[false true]);
[~,PcumloAchievedstr,~] = smart_exp_format(10^L10PcumloAchieved,2,[false true]);
[~,PcumhiAchievedstr,~] = smart_exp_format(10^L10PcumhiAchieved,2,[false true]);
ttl{5} = ['Achieved Pcum = ' ...
PcummdAchievedstr ' (95%: ' PcumloAchievedstr ' to ' ...
PcumhiAchievedstr ')'];
[~,Premmdstr,~] = smart_exp_format(10^L10Premmd,2,[false true]);
[~,Premlostr,~] = smart_exp_format(10^L10Premlo,2,[false true]);
[~,Premhistr,~] = smart_exp_format(10^L10Premhi,2,[false true]);
ttl{6} = ['RMM Pc = ' Premmdstr ' (95%: ' Premlostr ...
' to ' Premhistr ')'];
Nremmdstr = num2str(IntNmvrmd/Tmis,'%0.2f');
Nremlostr = num2str(IntNmvrlo/Tmis,'%0.2f');
Nremhistr = num2str(IntNmvrhi/Tmis,'%0.2f');
ttl{7} = ['Estimated RMM Rate = ' Nremmdstr ' / year (95%: ' Nremlostr ...
' to ' Nremhistr ')'];
title(ttl,'FontSize',tfsz,'FontWeight',tfwt,'FontAngle',tfan);
set(gca,'FontSize',afsz,'FontWeight',afwt,'LineWidth',alwd);
drawnow;
% Construct file name and save plot
plt_file_name = [output_file_root '_PcumVsPrem'];
plt_file_name = fullfile(params.outputdir,[plt_file_name params.plot_format]);
saveas(fighandle0,plt_file_name);
end
% Make the y = RMM-rate vs x = RMM-Pc plot
clf; plot(NaN,NaN);
if ~PcRemEstimation
% Calculated RMM numbers and Pcum values
ndx = L10PremSearch == L10PremExecution;
IntNmvrmd = Nmvrmd(ndx);
IntNmvrlo = Nmvrlo(ndx);
IntNmvrhi = Nmvrhi(ndx);
IntPcummd = Pcummd(ndx);
IntPcumlo = Pcumlo(ndx);
IntPcumhi = Pcumhi(ndx);
[~,PcummdAchievedstr,~] = smart_exp_format(IntPcummd,2,[false true]);
[~,PcumloAchievedstr,~] = smart_exp_format(IntPcumlo,2,[false true]);
[~,PcumhiAchievedstr,~] = smart_exp_format(IntPcumhi,2,[false true]);
end
% RMM rates
lorate = Nmvrlo/Tmis;
mdrate = Nmvrmd/Tmis;
hirate = Nmvrhi/Tmis;
IntRatemd = IntNmvrmd/Tmis;
% Prem x axis is log
set(gca, 'XScale', 'log');
% RMM rate y axis linear
ymx0 = max(hirate);
ymn0 = min(lorate);
yrng = plot_range([ymn0 ymx0],0.05); % Linear axis by default
ylim(yrng);
IntNmvrloPlot = IntNmvrlo;
% Change to log y axis for some cases
yfloor = 0.01;
if IntNmvrmd >= yfloor
if ymx0 > 10*ymn0
ymn1 = floor(log10(max(yfloor,ymn0)));
ymx1 = log10(max(ymx0,10*ymn1));
yrng = 10.^[ymn1 ymx1];
ylim(yrng);
iidx = lorate <= 0;
lorate(iidx) = min(yrng(1)/10000,min(lorate(~iidx)));
iidx = mdrate <= 0;
mdrate(iidx) = min(yrng(1)/1000,min(mdrate(~iidx)));
iidx = hirate <= 0;
hirate(iidx) = min(yrng(1)/100,min(hirate(~iidx)));
if IntNmvrlo < yrng(1)
IntNmvrloPlot = yrng(1);
end
set(gca, 'YScale', 'log');
end
end
set(gca, 'YScale', 'log');
% Plot median and bounding rate curves, which may have been
% affected by log plotting adjustments
hold on;
plot(PremSearch,hirate,'k:','LineWidth',1);
plot(PremSearch,mdrate,'k-','LineWidth',1);
plot(PremSearch,lorate,'k:','LineWidth',1);
if PcRemEstimation
% Overplot interpolated RMM rate when PcRem is estimated,
% along with vertical uncertainty bar, both in blue
plot(10.^L10Premmd,IntRatemd,'s', ...
'MarkerFaceColor','b','MarkerEdgeColor','b','LineWidth',1);
plot(10.^[L10Premmd L10Premmd],[IntNmvrlo IntNmvrhi]/Tmis,'b-','LineWidth',2);
else
% Estimated mission event rate
Nremmdval = IntNmvrmd/Tmis;
Nremloval = IntNmvrlo/Tmis;
Nremhival = IntNmvrhi/Tmis;
out.MissionEventRate = [Nremmdval Nremloval Nremhival];
% Overplot calculated RMM rate when PcRem is provided
if Nremmdval >= yrng(1)
NremmdvalPlot = Nremmdval; mrkrPlot = 's';
else
NremmdvalPlot = yrng(1); mrkrPlot = 'v';
end
plot(10.^L10PremExecution,NremmdvalPlot,mrkrPlot, ...
'MarkerFaceColor','b','MarkerEdgeColor','b','LineWidth',1);
plot(10.^[L10PremExecution L10PremExecution], ...
[IntNmvrloPlot IntNmvrhi]/Tmis,'b-','LineWidth',2);
% Generate title for ~PcRemEstimation case
ttl = titlWiRem;
nti = 1; ttl{nti} = 'Semi-Empirical Threshold Pc Event Rates';
Nremmdstr = num2str(Nremmdval,'%0.2f');
Nremlostr = num2str(Nremloval,'%0.2f');
Nremhistr = num2str(Nremhival,'%0.2f');
nti=12; ttl{nti} = ['Estimated event rate = ' ...
Nremmdstr ' / year (95%: ' Nremlostr ' to ' Nremhistr ')'];
txtclr = '{0 0 1}';
ttl{nti} = ['{\color[rgb]' txtclr ttl{nti} '}'];
nti=nti+1; ttl{nti} = ' ';
end
hold off;
% Axis limits and labels
ylabl = 'Event Rate (yr^{-1})';
if ~(PcLUDvsPcMaxOption > 0)
ylabl = [ylabl ', ' lower(params.redyel_event_option)];
end
xlabel('Threshold Pc','FontSize',xfsz,'FontWeight',xfwt);
ylabel(ylabl,'FontSize',yfsz,'FontWeight',yfwt);
xlim(10.^xrng);
% Log grid
grid on;
set(gca,'LineWidth',0.35, ...
'GridLineStyle','-','GridColor',repmat(0.5,[1 3]), ...
'MinorGridLineStyle','-','MinorGridColor',repmat(0.7,[1 3]));
% Render title
title(ttl,'FontSize',tfsz,'FontWeight',tfwt,'FontAngle',tfan);
% Axis fonts
set(gca,'FontSize',afsz,'FontWeight',afwt,'LineWidth',alwd);
drawnow
% Generate file name and save plot
plt_file_name = [output_file_root '_EventRateVsEventPc'];
plt_file_name = fullfile(params.outputdir,[plt_file_name params.plot_format]);
saveas(fighandle0,plt_file_name);
% Write the analysis results
if ~PcRemEstimation
logstr = ' ';
log_string(params.logfid,logstr,params.logging,params.displaying);
logstr = ['--- Summary of Semi-empirical Estimation Analysis ---'];
log_string(params.logfid,logstr,params.logging,params.displaying);
for iti=2:9
logstr = titlPlot{iti};
log_string(params.logfid,logstr,params.logging,params.displaying);
end
iti = 10;
logstr = strrep(titlPlot{iti},'type','RMM type');
logstr = strrep(logstr, '\rho','RMM reduction');
log_string(params.logfid,logstr,params.logging,params.displaying);
iti = 11;
logstr = titlPlot{iti};
log_string(params.logfid,logstr,params.logging,params.displaying);
logstr = ['Mission average above-threshold event rate = ' ...
Nremmdstr ' / year (95%: ' Nremlostr ' to ' Nremhistr ')'];
log_string(params.logfid,logstr,params.logging,params.displaying);
if params.make_Pcum_plots
[~,PcummdAchievedstr,~] = smart_exp_format(IntPcummd,2,[false true]);
[~,PcumloAchievedstr,~] = smart_exp_format(IntPcumlo,2,[false true]);
[~,PcumhiAchievedstr,~] = smart_exp_format(IntPcumhi,2,[false true]);
logstr = ['Mission cumulative Pc (with RMMs) = ' ...
PcummdAchievedstr ' (95%: ' PcumloAchievedstr ' to ' ...
PcumhiAchievedstr ')'];
log_string(params.logfid,logstr,params.logging,params.displaying);
[~,Pcummdstr,~] = smart_exp_format(PcummdNR,2,[false true]);
[~,Pcumlostr,~] = smart_exp_format(PcumloNR,2,[false true]);
[~,Pcumhistr,~] = smart_exp_format(PcumhiNR,2,[false true]);
logstr = ['Mission cumulative Pc (no RMMs) = ' ...
Pcummdstr ' (95%: ' Pcumlostr ' to ' Pcumhistr ')'];
log_string(params.logfid,logstr,params.logging,params.displaying);
end
logstr = ' ';
log_string(params.logfid,logstr,params.logging,params.displaying);
end
% Make Pcum and Nmvr images, and the associated table
if params.make_Pcum_images
% Construct the title for Prem estimation or given Rrem cases
if PcRemEstimation
% Construct a title which will also be used for the CSV
% table
nti = 0; titltable = cell(1,100);
nti=nti+1; titltable{nti} = ' ';
nti=nti+1; titltable{nti} = 'Semi-Empirical Risk Remediation Threshold Analysis';
nti = nti+1;
if Npri == 1
titltable{nti} = params.prisetstr;
else
titltable{nti} = strrep(params.prisetstr,'_',' ');
end
titltable{nti} = ['Orbit: ' titltable{nti} ' (' ...
num2str(round(mdper)) 'km x ' ...
num2str(round(mdapo)) 'km x ' ...
num2str(round(mdinc)) 'deg'];
if ~isempty(params.priorb)
titltable{nti} = [titltable{nti} ' in ' params.priorb ')'];
else
titltable{nti} = [titltable{nti} ')'];
end
nti=nti+1; titltable{nti} = ...
['Interval: ' minTCA ' to ' maxTCA ...
' (' num2str(delTCA_yr,'%0.2f') ' yr)'];
nti=nti+1; titltable{nti} = ['Unique events: ' num2str(Nall)];
if PcLUDvsPcMaxOption == 1
if params.exclude_noncatastrophic
titltable{nti} = [titltable{nti} ...
' (' num2str(sum(out.ConjDist.USElud)) ' within commit/catastrophic limits)'];
else
titltable{nti} = [titltable{nti} ...
' (' num2str(sum(out.ConjDist.USElud)) ' within commit time limits)'];
end
elseif PcLUDvsPcMaxOption == 2
if params.exclude_noncatastrophic
titltable{nti} = [titltable{nti} ...
' (' num2str(sum(out.ConjDist.USEmud)) ' within commit/catastrophic limits)'];
else
titltable{nti} = [titltable{nti} ...
' (' num2str(sum(out.ConjDist.USEmud)) ' within commit time limits)'];
end
end
nti=nti+1; titltable{nti} = ' ';
nti=nti+1; titltable{nti} = 'Mission & Risk Mitigation Manuever (RMM) Parameters';
nti=nti+1; titltable{nti} = ['Hard-body protection radius: HBR = ' ...
num2str(params.mission_HBR_meters) ' m'];
nti=nti+1; titltable{nti} = ['RMM type: ' ...
lower(params.RemManeuver) ' (reduction factor = ' ...
num2str(params.RemReduction) ')'];
nti=nti+1; titltable{nti} = ['RMM commit time limits: ' ...
num2str(min(params.CommitConsiderDays)) ' to ' ...
num2str(max(params.CommitConsiderDays)) ' day'];
nti=nti+1; titltable{nti} = ' ';
% Trim the table
titltable = titltable(1:nti);
titl = titltable;
else
% For EventRate mode 1
titl = titlPlot;
nti = 1; titl{nti} = 'Semi-Empirical Cumulative Risk Analysis';
nti = 11;
titl(nti) = strrep(ttl(nti+1),'event rate','RMM rate');
[~,PcummdAchievedstr,~] = smart_exp_format(IntPcummd,2,[false true]);
[~,PcumloAchievedstr,~] = smart_exp_format(IntPcumlo,2,[false true]);
[~,PcumhiAchievedstr,~] = smart_exp_format(IntPcumhi,2,[false true]);
nti=nti+1; titl{nti} = ['Mission Pc (with RMMs) = ' ...
PcummdAchievedstr ' (95%: ' PcumloAchievedstr ' to ' ...
PcumhiAchievedstr ')'];
txtclr = '{0 0 1}';
titl{nti} = ['{\color[rgb]' txtclr titl{nti} '}'];
[~,Pcummdstr,~] = smart_exp_format(PcummdNR,2,[false true]);
[~,Pcumlostr,~] = smart_exp_format(PcumloNR,2,[false true]);
[~,Pcumhistr,~] = smart_exp_format(PcumhiNR,2,[false true]);
nti=nti+1; titl{nti} = ['Mission Pc (no RMMs) = ' ...
Pcummdstr ' (95%: ' Pcumlostr ' to ' Pcumhistr ')'];
txtclr = '{0 0 1}';
titl{nti} = ['{\color[rgb]' txtclr titl{nti} '}'];
end
% Define plottable quantities
if PcRemEstimation
% Estimated RMM Pc threshold values {median & 95% low/high}
L10PremmdPlt = L10Premmd;
L10PremloPlt = L10Premmd;
L10PremhiPlt = L10Premmd;
else
% Given RMM Pc threshold value
L10PremmdPlt = L10PremExecution;
L10PremloPlt = L10PremExecution;
L10PremhiPlt = L10PremExecution;
end
% Plot L10Fred vs Prem image if required,
% and only for translational RMMs
if params.FredVsPremImage && TransMan
% Calculate image only for the first mission lifetime
NL10FredImage = params.L10FredImage(3);
L10FredImage = linspace(params.L10FredImage(1), ...
params.L10FredImage(2), ...
NL10FredImage);
PcummdImage0 = NaN(NPremImage,NL10FredImage);
NmvrmdImage0 = NaN(NPremImage,NL10FredImage);
parfor n=1:NL10FredImage % parfor enabled
Fred = 10^L10FredImage(n);
[pnb] = Prem_Nmvr_Bootstrap(Npri, ...
Nobs,Tobs,Pcobs,Tmis,SecCatGrowth,TransMan,Fred, ...
Nboot,alp95,lnPcunc,augevent,PremImage,rndboot);
PcummdImage0(:,n) = pnb.Pcummd';
NmvrmdImage0(:,n) = pnb.Nmvrmd' / Tmis;
end
ylabl = 'Log_{10}[Reduction Factor \rho]';
Pcrem_images(L10PremImage,L10PremmdPlt,L10PremloPlt,L10PremhiPlt, ...
L10FredImage,log10(Reduction),PcummdImage0, ...
[],ylabl,titl);
% Construct file name and save plot
plt_file_name = [output_file_root '_RhoVsPremImage'];
plt_file_name = fullfile(params.outputdir,[plt_file_name params.plot_format]);
saveas(gcf,plt_file_name);
end
% Plot Tmis vs Prem images
PcummdImage = NaN(NPremImage,NTmisImage);
NmvrmdImage = NaN(NPremImage,NTmisImage);
parfor n=1:NTmisImage % parfor enabled
Tms = TmisImage(n);
[pnb] = Prem_Nmvr_Bootstrap(Npri, ...
Nobs,Tobs,Pcobs,Tms,SecCatGrowth,TransMan,Reduction, ...
Nboot,alp95,lnPcunc,augevent,PremImage,[]);
PcummdImage(:,n) = pnb.Pcummd';
NmvrmdImage(:,n) = pnb.Nmvrmd' / Tms;
L10Pcummd = log10(pnb.Pcummd);
L10Pcumlo = log10(pnb.Pcumlo);
L10Pcumhi = log10(pnb.Pcumhi);
for m=1:NPcmisTable
irp{n,m} = interp_risk_params( ...
L10PcmisTable(m),L10PremImage, ...
L10Pcummd,L10Pcumlo,L10Pcumhi, ...
pnb.Nmvrmd,pnb.Nmvrlo,pnb.Nmvrhi);
end
end
% Construct version of the images without the nominal
% solution marked
if ~PcRemEstimation
titltable = titl(1:8);
end
% Y axis label for the images
ylabl = 'Duration (years)';
% Make two-tiered Pcum image (top) RMM-rate image (bottom)
two_tiered_image = true;
if two_tiered_image
% Generate two-tiered image plot
Pcrem_images(L10PremImage,[],[],[], ...
TmisImage,Tmis,PcummdImage,NmvrmdImage, ...
ylabl,titltable);
% Construct file name and save plot
plt_file_name = [output_file_root '_DurRateVsPremImage'];
plt_file_name = fullfile(params.outputdir,[plt_file_name params.plot_format]);
saveas(gcf,plt_file_name);
end
% Generate single tiered-image of y = Duration vs x = Pcum
Pcrem_images(L10PremImage,[],[],[], ...
TmisImage,Tmis,PcummdImage,[], ...
ylabl,titltable);
% Construct file name and save plot
plt_file_name = [output_file_root '_DurVsPremImage'];
plt_file_name = fullfile(params.outputdir,[plt_file_name params.plot_format]);
saveas(gcf,plt_file_name);
% Revise the title for later use
if PcRemEstimation
titltable = [titltable(2:5) titltable(7:end)];
end
% Construct a version of the images with the nominal solution
% marked
ylabl = 'Duration (years)';
Pcrem_images(L10PremImage,L10PremmdPlt,L10PremloPlt,L10PremhiPlt, ...
TmisImage,Tmis,PcummdImage,[],ylabl,titl);
% Construct file name and save plot
plt_file_name = [output_file_root '_DurMisVsPremImage'];
plt_file_name = fullfile(params.outputdir,[plt_file_name params.plot_format]);
saveas(gcf,plt_file_name);
% Write output tables, if required
if PcRemEstimation && ...
(Nmissionyrs > 0) && (NTmisTable > 0) && (NPcmisTable > 0)
% Write risk remediation tables.
% Two versions: 1 = nominal estimates
% 2 = conservative estimates (using 95% ranges)
for ntabver=1:2
if ntabver == 1
vstr = '';
else
vstr = '_95PctUnc';
end
if nset == 1
pfr0 = [ModeStr '_'];
else
pfr0 = [plt_file_root0 '_'];
end
if isempty(params.priorb)
pos ='';
else
pos = [strrep(strtrim(params.priorb),' ','_') '_'];
end
pss = [pos params.prisetstr '_' ...
num2str(round(mdper)) 'km' ...
num2str(round(mdapo)) 'km' ...
num2str(round(mdinc)) 'dg'];
tab_file_root = [pfr0 pss ...
'_HBR' num2str(params.mission_HBR_meters) 'm' ...
'_Commit' num2str(min(params.CommitConsiderDays),'%0.1f') 'dy'];
if params.add_one_unrem_event
tab_file_root = [tab_file_root '_Add1ThEv'];
end
if params.exclude_noncatastrophic
tab_file_root = [tab_file_root '_ExcNonCat'];
else
tab_file_root = [tab_file_root '_IncNonCat'];
end
tab_file_root = [tab_file_root vstr];
tab_file_name = fullfile(params.outputdir,[tab_file_root '.csv']);
tabfid = fopen(tab_file_name,'wt');
for nti=1:numel(titltable)
fprintf(tabfid,'%s\n',titltable{nti});
end
% Construct Pcum goal list header line
outstr = ' , ';
for np=1:NPcmisTable
outstr = cat(2,outstr, ...
[', ' smart_exp_format(PcmisTable(np),3)]);
outstr = sprintf([outstr '\t']);
end
header = outstr;
% Tabulate three quantities: Prem, Nmvr and Pcum
for nq=1:3
if nq == 1
outstr = 'Remediation Threshold Pc';
elseif nq == 2
outstr = 'Remediation Rate (RMM/yr)';
else
outstr = 'Cumulative Pc Achieved';
end
fprintf(tabfid,'%s\n',outstr);
if nq == 1
outstr = ' , , Cumulative Pc Goal';
fprintf(tabfid,'%s\n',outstr);
fprintf(tabfid,'%s\n',header);
end
for nt=1:NTmisTable
% Current mission duration for table
Tms = TmisTable(nt);
% Ensure this table Tmis value is within previously-constructed
% image Tmis array
ndx = (Tms == TmisImage);
Nndx = sum(ndx);
if (Nndx == 0)
error('All TmisTable values must be in TmisImage array');
elseif (Nndx ~= 1)
error('Invalid TmisTable or TmisImage value');
end
% Tabulate data for all mission Pcum goal values
if nt == 1
outstr = ['Duration (yr) , ' num2str(Tms,'%0.1f')];
else
outstr = [' , ' num2str(Tms,'%0.1f')];
end
outstr = sprintf([outstr '\t']);
for np=1:NPcmisTable
L10Pcm = L10PcmisTable(np);
if (L10Pcm == L10Pcmission) && (Tms == Tmis)
% Use interpolated risk parameters for nominal mission
% (which match with the image figure values)
irp1 = irp0;
else
% Use interpolated risk parameters saved during image
% construction
irp1 = irp{ndx,np};
end
tabfmt = '%0.2e';
if ntabver == 1
% Nominal remediation recommendations
if nq == 1
qstr = num2str(10^irp1.L10Premmd,tabfmt);
elseif nq == 2
qstr = num2str(irp1.NmvrmdAchieved/Tms,tabfmt);
else
qstr = num2str(10^irp1.L10PcummdAchieved,tabfmt);
end
else
% Conservative remediation recommendations
if nq == 1
qstr = num2str(10^irp1.L10Premlo,tabfmt);
elseif nq == 2
qstr = num2str(irp1.NmvrhiAchieved/Tms,tabfmt);
else
qstr = num2str(10^irp1.L10PcumloAchieved,tabfmt);
end
end
outstr = cat(2,outstr,[', ' qstr]);
outstr = sprintf([outstr '\t']);
end
fprintf(tabfid,'%s\n',outstr);
end
end
% Close CSV table
fclose(tabfid);
end
end
end
end
% Report SVI rates (typically not done for the EventRate version of
% ConjDist algorithm)
if params.report_and_plot_svi_rates
% Report SVI rates averaged over entire interval
out.ConjDist.Nall(nset) = Nall;
out.ConjDist.Nyel(nset) = Nyel;
out.ConjDist.Nred(nset) = Nred;
out.ConjDist.fracs.yel.md(nset) = myel;
out.ConjDist.fracs.yel.lo(nset) = ryel(1);
out.ConjDist.fracs.yel.hi(nset) = ryel(2);
out.ConjDist.fracs.red.md(nset) = mred;
out.ConjDist.fracs.red.lo(nset) = rred(1);
out.ConjDist.fracs.red.hi(nset) = rred(2);
md = Nall;
sg = chifact*sqrt(Nall);
out.ConjDist.rates.all.md(nset) = md/out.ConjDist.TCAdelt;
out.ConjDist.rates.all.lo(nset) = max(0,md-sg)/out.ConjDist.TCAdelt;
out.ConjDist.rates.all.hi(nset) = max(md+sg)/out.ConjDist.TCAdelt;
md = Nyel;
sg = chifact*sqrt(Nyel);
out.ConjDist.rates.yel.md(nset) = md/out.ConjDist.TCAdelt;
out.ConjDist.rates.yel.lo(nset) = max(0,md-sg)/out.ConjDist.TCAdelt;
out.ConjDist.rates.yel.hi(nset) = max(md+sg)/out.ConjDist.TCAdelt;
md = Nred;
sg = chifact*sqrt(Nred);
out.ConjDist.rates.red.md(nset) = md/out.ConjDist.TCAdelt;
out.ConjDist.rates.red.lo(nset) = max(0,md-sg)/out.ConjDist.TCAdelt;
out.ConjDist.rates.red.hi(nset) = max(md+sg)/out.ConjDist.TCAdelt;
[all_md,all_lo,all_hi] = smart_error_range(out.ConjDist.rates.all.md(nset), ...
out.ConjDist.rates.all.lo(nset),out.ConjDist.rates.all.hi(nset));
logstr = [' Overall average total rate = ' ...
all_md ' events/day (95% conf: ' all_lo ' to ' all_hi ')'];
log_string(params.logfid,logstr,params.logging,params.displaying);
[yel_md,yel_lo,yel_hi] = smart_error_range(out.ConjDist.rates.yel.md(nset), ...
out.ConjDist.rates.yel.lo(nset),out.ConjDist.rates.yel.hi(nset));
logstr = [' Overall average yellow rate = ' ...
yel_md ' events/day (95% conf: ' yel_lo ' to ' yel_hi ')'];
log_string(params.logfid,logstr,params.logging,params.displaying);
[red_md,red_lo,red_hi] = smart_error_range(out.ConjDist.rates.red.md(nset), ...
out.ConjDist.rates.red.lo(nset),out.ConjDist.rates.red.hi(nset));
logstr = [' Overall average red rate = ' ...
red_md ' events/day (95% conf: ' red_lo ' to ' red_hi ')'];
log_string(params.logfid,logstr,params.logging,params.displaying);
[ymd,ylo,yhi] = smart_error_range(100*myel,100*ryel(1),100*ryel(2));
logstr = [' Overall average yellow fraction = ' ...
ymd '% (95% conf: ' ylo '% to ' yhi '%)'];
log_string(params.logfid,logstr,params.logging,params.displaying);
[rmd,rlo,rhi] = smart_error_range(100*mred,100*rred(1),100*rred(2));
logstr = [' Overall average red fraction = ' ...
rmd '% (95% conf: ' rlo '% to ' rhi '%)'];
log_string(params.logfid,logstr,params.logging,params.displaying);
% Perform the time binning for this set
if params.make_time_bins
% Median TCAs for current subset of events
TCAset = out.ConjDist.TCAmed(eset);
% Loop through bins and define rates and fractions
for nbin=1:out.ConjDist.bins.Nbin
% Bin time bounds
t1 = out.ConjDist.bins.Tbinlo(nbin);
t2 = out.ConjDist.bins.Tbinhi(nbin);
dt = t2-t1;
% Find events in current bin, and effective bin time width
if (nbin < out.ConjDist.bins.Nbin)
inbin = (t1 <= TCAset) & (TCAset < t2);
else
inbin = (t1 <= TCAset) & (TCAset <= t2);
end
Ninb = sum(inbin);
md = Ninb;
sg = chifact*sqrt(Ninb);
out.ConjDist.rates.binall.md(nset,nbin) = md/dt;
out.ConjDist.rates.binall.lo(nset,nbin) = max(0,md-sg)/dt;
out.ConjDist.rates.binall.hi(nset,nbin) = (md+sg)/dt;
Nyel = sum(inbin & yel);
md = Nyel;
sg = chifact*sqrt(Nyel);
out.ConjDist.rates.binyel.md(nset,nbin) = md/dt;
out.ConjDist.rates.binyel.lo(nset,nbin) = max(0,md-sg)/dt;
out.ConjDist.rates.binyel.hi(nset,nbin) = (md+sg)/dt;
if (Ninb == 0)
md = 0; lohi = [0 0];
else
[md,lohi] = ConjDist_binofit(Nyel,Ninb);
end
out.ConjDist.fracs.binyel.md(nset,nbin) = md;
out.ConjDist.fracs.binyel.lo(nset,nbin) = lohi(1);
out.ConjDist.fracs.binyel.hi(nset,nbin) = lohi(2);
Nred = sum(inbin & red);
md = Nred;
sg = chifact*sqrt(Nred);
out.ConjDist.rates.binred.md(nset,nbin) = md/dt;
out.ConjDist.rates.binred.lo(nset,nbin) = max(0,md-sg)/dt;
out.ConjDist.rates.binred.hi(nset,nbin) = (md+sg)/dt;
if (Ninb == 0)
md = 0; lohi = [0 0];
else
[md,lohi] = ConjDist_binofit(Nred,Ninb);
end
out.ConjDist.fracs.binred.md(nset,nbin) = md;
out.ConjDist.fracs.binred.lo(nset,nbin) = lohi(1);
out.ConjDist.fracs.binred.hi(nset,nbin) = lohi(2);
end
% Estimate bin-to-bin variation median values, and "resample"
% (i.e., sample using the estimated uncertainties on each point)
% to estimate the 95% confidence ranges.
% Also check if the SVI (nset=2) or nonSVI (nset=3) subsets are
% identical to the ALL (nset=1) set. If so, then use those
% previously resampled results.
[out.ConjDist.rates.bavgall.md, ...
out.ConjDist.rates.bavgall.lo, ...
out.ConjDist.rates.bavgall.hi] = ...
ConjDist_set_resample(nset, ...
out.ConjDist.rates.binall.md, ...
out.ConjDist.rates.binall.lo, ...
out.ConjDist.rates.binall.hi, ...
out.ConjDist.rates.bavgall.md, ...
out.ConjDist.rates.bavgall.lo, ...
out.ConjDist.rates.bavgall.hi, ...
params.bin_samples,0.05,[0 Inf]);
[out.ConjDist.rates.bavgyel.md, ...
out.ConjDist.rates.bavgyel.lo, ...
out.ConjDist.rates.bavgyel.hi] = ...
ConjDist_set_resample(nset, ...
out.ConjDist.rates.binyel.md, ...
out.ConjDist.rates.binyel.lo, ...
out.ConjDist.rates.binyel.hi, ...
out.ConjDist.rates.bavgyel.md, ...
out.ConjDist.rates.bavgyel.lo, ...
out.ConjDist.rates.bavgyel.hi, ...
params.bin_samples,0.05,[0 Inf]);
[out.ConjDist.rates.bavgred.md, ...
out.ConjDist.rates.bavgred.lo, ...
out.ConjDist.rates.bavgred.hi] = ...
ConjDist_set_resample(nset, ...
out.ConjDist.rates.binred.md, ...
out.ConjDist.rates.binred.lo, ...
out.ConjDist.rates.binred.hi, ...
out.ConjDist.rates.bavgred.md, ...
out.ConjDist.rates.bavgred.lo, ...
out.ConjDist.rates.bavgred.hi, ...
params.bin_samples,0.05,[0 Inf]);
[out.ConjDist.fracs.bavgyel.md, ...
out.ConjDist.fracs.bavgyel.lo, ...
out.ConjDist.fracs.bavgyel.hi] = ...
ConjDist_set_resample(nset, ...
out.ConjDist.fracs.binyel.md, ...
out.ConjDist.fracs.binyel.lo, ...
out.ConjDist.fracs.binyel.hi, ...
out.ConjDist.fracs.bavgyel.md, ...
out.ConjDist.fracs.bavgyel.lo, ...
out.ConjDist.fracs.bavgyel.hi, ...
params.bin_samples,0.05,[0 1]);
[out.ConjDist.fracs.bavgred.md, ...
out.ConjDist.fracs.bavgred.lo, ...
out.ConjDist.fracs.bavgred.hi] = ...
ConjDist_set_resample(nset, ...
out.ConjDist.fracs.binred.md, ...
out.ConjDist.fracs.binred.lo, ...
out.ConjDist.fracs.binred.hi, ...
out.ConjDist.fracs.bavgred.md, ...
out.ConjDist.fracs.bavgred.lo, ...
out.ConjDist.fracs.bavgred.hi, ...
params.bin_samples,0.05,[0 1]);
[all_md,all_lo,all_hi] = smart_error_range(out.ConjDist.rates.bavgall.md(nset), ...
out.ConjDist.rates.bavgall.lo(nset),out.ConjDist.rates.bavgall.hi(nset));
logstr = [' Bin-to-bin average total rate = ' ...
all_md ' events/day (95% conf: ' all_lo ' to ' all_hi ')'];
log_string(params.logfid,logstr,params.logging,params.displaying);
[yel_md,yel_lo,yel_hi] = smart_error_range(out.ConjDist.rates.bavgyel.md(nset), ...
out.ConjDist.rates.bavgyel.lo(nset),out.ConjDist.rates.bavgyel.hi(nset));
logstr = [' Bin-to-bin average yellow rate = ' ...
yel_md ' events/day (95% conf: ' yel_lo ' to ' yel_hi ')'];
log_string(params.logfid,logstr,params.logging,params.displaying);
[red_md,red_lo,red_hi] = smart_error_range(out.ConjDist.rates.bavgred.md(nset), ...
out.ConjDist.rates.bavgred.lo(nset),out.ConjDist.rates.bavgred.hi(nset));
logstr = [' Bin-to-bin average red rate = ' ...
red_md ' events/day (95% conf: ' red_lo ' to ' red_hi ')'];
log_string(params.logfid,logstr,params.logging,params.displaying);
[yel_md,yel_lo,yel_hi] = smart_error_range( ...
100*out.ConjDist.fracs.bavgyel.md(nset), ...
100*out.ConjDist.fracs.bavgyel.lo(nset), ...
100*out.ConjDist.fracs.bavgyel.hi(nset));
logstr = [' Bin-to-bin average yellow fraction = ' ...
yel_md '% (95% conf: ' yel_lo '% to ' yel_hi '%)'];
log_string(params.logfid,logstr,params.logging,params.displaying);
[red_md,red_lo,red_hi] = smart_error_range( ...
100*out.ConjDist.fracs.bavgred.md(nset), ...
100*out.ConjDist.fracs.bavgred.lo(nset), ...
100*out.ConjDist.fracs.bavgred.hi(nset));
logstr = [' Bin-to-bin average red fraction = ' ...
red_md '% (95% conf: ' red_lo '% to ' red_hi '%)'];
log_string(params.logfid,logstr,params.logging,params.displaying);
if params.make_time_plots(nset)
if nset == 1
clear time_title;
nti = 1;
if Npri == 1
time_title{nti} = ['Primary: ' params.prisetstr];
else
time_title{nti} = ['Primary set: ' params.prisetstr];
end
time_title{nti} = strrep(time_title{nti},'_',' ');
nti=nti+1; time_title{nti} = params.OCMDBroot;
time_title{nti} = strrep(time_title{nti},'_','\_');
bstr1 = num2str(params.TCAbin_days,'%0.1f');
bstr2 = num2str(params.TCAbin_days);
if length(bstr1) < length(bstr2)
bstr = bstr1;
else
bstr = bstr2;
end
nti=nti+1; time_title{nti} = ...
['Span = ' num2str(out.ConjDist.TCAdelt,'%0.1f') ...
' days (Bin = ' bstr ')'];
nti=nti+1;
plt_file_root = 'All';
elseif nset == 2
plt_file_root = 'SVI';
else
plt_file_root = 'NonSVI';
end
% time_title{nti} = titstr;
fighandle1 = ConjDist_time_plot(nset,time_title, ...
out.ConjDist.bins,out.ConjDist.rates,out.ConjDist.fracs, ...
params,fighandle1);
plt_file_root = [plt_file_root '_Time_' ...
params.prisetstr '_Ne' num2str(Nall)];
if params.timestamp
plt_file_root = [plt_file_root '_' params.timetag];
end
plt_file_name = fullfile(params.outputdir,[plt_file_root params.plot_format]);
% orient(fighandle1,'Landscape');
saveas(fighandle1,plt_file_name);
end
end
end
end
%% Close the figures and the log file and return
logstr = [params.start_time ' Function EventRate_ConjDist complete'];
log_string(params.logfid,logstr,params.logging,params.displaying);
if params.logging; fclose(params.logfid); end
return
end
% ----------------- END OF CODE ------------------
%
% Please record any changes to the software in the change history
% shown below:
%
% ----------------- CHANGE HISTORY ------------------
% Developer | Date | Description
% ---------------------------------------------------
% D. Hall | 2022-Apr-11 | Initial version.
% N. Ravago | 2025-Oct-29 | Integrated PcMultiStep
% =========================================================================
%
% Copyright (c) 2025 United States Government as represented by the
% Administrator of the National Aeronautics and Space Administration.
% All Rights Reserved.
%
% =========================================================================
function [out,params] = EventRate_ConjDist(params)
% EventRate_ConjDist - Calculate and plot conjunction distributions for a
% specified set of CARA primary objects
% Syntax: [out, params] = EventRate_ConjDist(params);
%
% =========================================================================
%
% Copyright (c) 2025 United States Government as represented by the
% Administrator of the National Aeronautics and Space Administration.
% All Rights Reserved.
%
% =========================================================================
%
% Description: Calculate and plot conjunction distributions for a specified
% set of CARA primary objects
%
% This code has been adapted from the original ConjDist.m R&D code,
% adjusted to work with the EventRate.m function, by turning several
% of its original modes off.
%
% =========================================================================
%
% Input:
%
% params - Auxilliary input parameter structure
%
% =========================================================================
%
% Output:
%
% out - Output structure with the following fields:
%
% MissionEventRate: 5-50-95 percentile estimated red
% event rates for the given mission at the input Pc
% threshold
%
% ConjDist: Output substructure containing various
% intermediate values used to obtain output plots
%
% params - Structure. See 'EventRate_ConjDist_default_params.m' for more
% documentation
%
% =========================================================================
%
% References:
%
% Doyle Hall (2019) "Determining Appropriate Risk Remediation Thresholds
% from Empirical Conjunction Data using Survival Probability Methods"
% AAS 19-631.
%
% =========================================================================
%
% Dependencies:
%
% ConjDist_binofit.m
% ConjDist_set_resample.m
% EventRate_ConjDist_default_params.m
% ConjDist_update_plot.m
% ConjDist_altlat_plot.m
% ConjDist_time_plot.m (Only if reporting SVI rates)
%
% ../../../CovarianceRealism
% ../../../Utils/OrbitTransformations
% ../../../Utils/CovarianceTransformations
% ../../../Utils/LoggingAndStringReporting
% ../../../Utils/Plotting
% ../../../Utils/TimeTransformations
%
% For 'exclude non-catastrophic events':
%
% ../../../ProbabilityOfCollision
% ../../../Utils/AugmentedMath
%
% =========================================================================
%
% Subfunctions:
%
% None
%
% =========================================================================
%
% Initial version: Apr 2022; Latest update: Oct 2025
%
% ----------------- BEGIN CODE -----------------
%% Initializations and defaults
persistent pathsAdded
if isempty(pathsAdded)
[p,~,~] = fileparts(mfilename('fullpath'));
s = what(fullfile(p,'../matlab_lib')); addpath(s.path);
s = what(fullfile(p,'../../../CovarianceRealism')); addpath(s.path);
s = what(fullfile(p,'../../../CollisionConsequence')); addpath(s.path);
s = what(fullfile(p,'../../../Utils/OrbitTransformations')); addpath(s.path);
s = what(fullfile(p,'../../../Utils/CovarianceTransformations')); addpath(s.path);
s = what(fullfile(p,'../../../Utils/LoggingAndStringReporting')); addpath(s.path);
s = what(fullfile(p,'../../../Utils/Plotting')); addpath(s.path);
s = what(fullfile(p,'../../../Utils/TimeTransformations')); addpath(s.path);
pathsAdded = true;
end