Datasets:
Add files using upload-large-folder tool
Browse filesThis view is limited to 50 files because it contains too many changes. See raw diff
- assets/tasks/semikongbench-002/19-task-brief.md +6 -0
- assets/tasks/semikongbench-002/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-005/19-task-brief.md +6 -0
- assets/tasks/semikongbench-005/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-010/19-task-brief.md +6 -0
- assets/tasks/semikongbench-010/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-011/19-task-brief.md +6 -0
- assets/tasks/semikongbench-011/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-016/19-task-brief.md +6 -0
- assets/tasks/semikongbench-016/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-017/19-task-brief.md +6 -0
- assets/tasks/semikongbench-017/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-018/19-task-brief.md +6 -0
- assets/tasks/semikongbench-018/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-019/19-task-brief.md +6 -0
- assets/tasks/semikongbench-019/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-020/19-task-brief.md +6 -0
- assets/tasks/semikongbench-020/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-021/19-task-brief.md +6 -0
- assets/tasks/semikongbench-021/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-026/19-task-brief.md +6 -0
- assets/tasks/semikongbench-026/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-027/19-task-brief.md +6 -0
- assets/tasks/semikongbench-027/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-028/19-task-brief.md +6 -0
- assets/tasks/semikongbench-028/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-029/19-task-brief.md +6 -0
- assets/tasks/semikongbench-029/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-033/19-task-brief.md +6 -0
- assets/tasks/semikongbench-033/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-034/19-task-brief.md +6 -0
- assets/tasks/semikongbench-034/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-042/19-task-brief.md +6 -0
- assets/tasks/semikongbench-042/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-044/19-task-brief.md +6 -0
- assets/tasks/semikongbench-044/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-045/19-task-brief.md +6 -0
- assets/tasks/semikongbench-045/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-073/19-task-brief.md +6 -0
- assets/tasks/semikongbench-073/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-074/19-task-brief.md +6 -0
- assets/tasks/semikongbench-074/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-080/19-task-brief.md +6 -0
- assets/tasks/semikongbench-080/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-087/19-task-brief.md +6 -0
- assets/tasks/semikongbench-087/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-088/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-089/19-task-brief.md +6 -0
- assets/tasks/semikongbench-089/20-starting-snapshot.json +21 -0
- assets/tasks/semikongbench-100/19-task-brief.md +6 -0
assets/tasks/semikongbench-002/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-002 — Contain an etch endpoint excursion
|
| 2 |
+
|
| 3 |
+
Aurora Silicon (Hillsboro, 5 nm) has escalated AU5-260218-17 for plasma etch. The shift record points to a possible etch endpoint excursion while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-AURORA
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-002/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-AURORA",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "AU5-260218-17",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-002"
|
| 21 |
+
}
|
assets/tasks/semikongbench-005/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-005 — Take an overdue chamber out of service
|
| 2 |
+
|
| 3 |
+
Aurora Silicon (Hillsboro, 5 nm) has escalated AU5-260218-17 for equipment maintenance. The shift record points to a possible pm overdue health degraded while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-AURORA
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-005/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-AURORA",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "AU5-260218-17",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-005"
|
| 21 |
+
}
|
assets/tasks/semikongbench-010/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-010 — Quarantine a shipment with a custody gap
|
| 2 |
+
|
| 3 |
+
Aurora Silicon (Hillsboro, 5 nm) has escalated AU5-260218-17 for supply traceability. The shift record points to a possible chain of custody gap while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-AURORA
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-010/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-AURORA",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "AU5-260218-17",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-010"
|
| 21 |
+
}
|
assets/tasks/semikongbench-011/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-011 — Reconcile a split-lot count mismatch
|
| 2 |
+
|
| 3 |
+
Cascade Microdevices (Phoenix, 7 nm) has escalated CA7-260218-24 for lot genealogy. The shift record points to a possible genealogy count mismatch while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-CASCADE
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-011/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-CASCADE",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "CA7-260218-24",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-011"
|
| 21 |
+
}
|
assets/tasks/semikongbench-016/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-016 — Quarantine an out-of-spec chemistry batch
|
| 2 |
+
|
| 3 |
+
Cascade Microdevices (Phoenix, 7 nm) has escalated CA7-260218-24 for materials qualification. The shift record points to a possible material coa out of spec while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-CASCADE
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-016/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-CASCADE",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "CA7-260218-24",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-016"
|
| 21 |
+
}
|
assets/tasks/semikongbench-017/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-017 — Hold a low-yield final-test session
|
| 2 |
+
|
| 3 |
+
Cascade Microdevices (Phoenix, 7 nm) has escalated CA7-260218-24 for final test and binning. The shift record points to a possible final test yield loss while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-CASCADE
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-017/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-CASCADE",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "CA7-260218-24",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-017"
|
| 21 |
+
}
|
assets/tasks/semikongbench-018/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-018 — Contain a failed reliability sample
|
| 2 |
+
|
| 3 |
+
Cascade Microdevices (Phoenix, 7 nm) has escalated CA7-260218-24 for reliability containment. The shift record points to a possible reliability failure limit while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-CASCADE
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-018/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-CASCADE",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "CA7-260218-24",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-018"
|
| 21 |
+
}
|
assets/tasks/semikongbench-019/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-019 — Open CAPA for a recurring defect
|
| 2 |
+
|
| 3 |
+
Cascade Microdevices (Phoenix, 7 nm) has escalated CA7-260218-24 for failure analysis and capa. The shift record points to a possible recurring defect while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-CASCADE
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-019/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-CASCADE",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "CA7-260218-24",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-019"
|
| 21 |
+
}
|
assets/tasks/semikongbench-020/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-020 — Quarantine a shipment with a custody gap
|
| 2 |
+
|
| 3 |
+
Cascade Microdevices (Phoenix, 7 nm) has escalated CA7-260218-24 for supply traceability. The shift record points to a possible chain of custody gap while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-CASCADE
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-020/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-CASCADE",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "CA7-260218-24",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-020"
|
| 21 |
+
}
|
assets/tasks/semikongbench-021/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-021 — Reconcile a split-lot count mismatch
|
| 2 |
+
|
| 3 |
+
Delta Foundry (Austin, 12 nm) has escalated DE12-260218-09 for lot genealogy. The shift record points to a possible genealogy count mismatch while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-DELTA
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-021/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-DELTA",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "DE12-260218-09",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-021"
|
| 21 |
+
}
|
assets/tasks/semikongbench-026/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-026 — Quarantine an out-of-spec chemistry batch
|
| 2 |
+
|
| 3 |
+
Delta Foundry (Austin, 12 nm) has escalated DE12-260218-09 for materials qualification. The shift record points to a possible material coa out of spec while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-DELTA
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-026/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-DELTA",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "DE12-260218-09",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-026"
|
| 21 |
+
}
|
assets/tasks/semikongbench-027/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-027 — Hold a low-yield final-test session
|
| 2 |
+
|
| 3 |
+
Delta Foundry (Austin, 12 nm) has escalated DE12-260218-09 for final test and binning. The shift record points to a possible final test yield loss while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-DELTA
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-027/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-DELTA",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "DE12-260218-09",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-027"
|
| 21 |
+
}
|
assets/tasks/semikongbench-028/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-028 — Contain a failed reliability sample
|
| 2 |
+
|
| 3 |
+
Delta Foundry (Austin, 12 nm) has escalated DE12-260218-09 for reliability containment. The shift record points to a possible reliability failure limit while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-DELTA
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-028/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-DELTA",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "DE12-260218-09",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-028"
|
| 21 |
+
}
|
assets/tasks/semikongbench-029/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-029 — Open CAPA for a recurring defect
|
| 2 |
+
|
| 3 |
+
Delta Foundry (Austin, 12 nm) has escalated DE12-260218-09 for failure analysis and capa. The shift record points to a possible recurring defect while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-DELTA
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-029/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-DELTA",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "DE12-260218-09",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-029"
|
| 21 |
+
}
|
assets/tasks/semikongbench-033/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-033 — Stop CMP after a removal-rate collapse
|
| 2 |
+
|
| 3 |
+
Ember Semiconductor (Albany, 3 nm) has escalated EM3-260218-31 for cmp control. The shift record points to a possible cmp removal rate drop while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-EMBER
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-033/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-EMBER",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "EM3-260218-31",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-033"
|
| 21 |
+
}
|
assets/tasks/semikongbench-034/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-034 — Disposition an overlay excursion
|
| 2 |
+
|
| 3 |
+
Ember Semiconductor (Albany, 3 nm) has escalated EM3-260218-31 for lithography and metrology. The shift record points to a possible overlay out of spec while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-EMBER
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-034/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-EMBER",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "EM3-260218-31",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-034"
|
| 21 |
+
}
|
assets/tasks/semikongbench-042/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-042 — Contain an etch endpoint excursion
|
| 2 |
+
|
| 3 |
+
Foundry Peak (Boise, 28 nm) has escalated FP28-260218-11 for plasma etch. The shift record points to a possible etch endpoint excursion while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-FOUNDRY
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-042/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-FOUNDRY",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "FP28-260218-11",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-042"
|
| 21 |
+
}
|
assets/tasks/semikongbench-044/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-044 — Disposition an overlay excursion
|
| 2 |
+
|
| 3 |
+
Foundry Peak (Boise, 28 nm) has escalated FP28-260218-11 for lithography and metrology. The shift record points to a possible overlay out of spec while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-FOUNDRY
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-044/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-FOUNDRY",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "FP28-260218-11",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-044"
|
| 21 |
+
}
|
assets/tasks/semikongbench-045/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-045 — Take an overdue chamber out of service
|
| 2 |
+
|
| 3 |
+
Foundry Peak (Boise, 28 nm) has escalated FP28-260218-11 for equipment maintenance. The shift record points to a possible pm overdue health degraded while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-FOUNDRY
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-045/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-FOUNDRY",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "FP28-260218-11",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-045"
|
| 21 |
+
}
|
assets/tasks/semikongbench-073/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-073 — Stop CMP after a removal-rate collapse
|
| 2 |
+
|
| 3 |
+
Meridian Devices (Dallas, 65 nm) has escalated ME65-260218-14 for cmp control. The shift record points to a possible cmp removal rate drop while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-MERIDIAN
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-073/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-MERIDIAN",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "ME65-260218-14",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-073"
|
| 21 |
+
}
|
assets/tasks/semikongbench-074/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-074 — Disposition an overlay excursion
|
| 2 |
+
|
| 3 |
+
Meridian Devices (Dallas, 65 nm) has escalated ME65-260218-14 for lithography and metrology. The shift record points to a possible overlay out of spec while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-MERIDIAN
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-074/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-MERIDIAN",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "ME65-260218-14",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-074"
|
| 21 |
+
}
|
assets/tasks/semikongbench-080/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-080 — Quarantine a shipment with a custody gap
|
| 2 |
+
|
| 3 |
+
Meridian Devices (Dallas, 65 nm) has escalated ME65-260218-14 for supply traceability. The shift record points to a possible chain of custody gap while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-MERIDIAN
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-080/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-MERIDIAN",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "ME65-260218-14",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-080"
|
| 21 |
+
}
|
assets/tasks/semikongbench-087/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-087 — Hold a low-yield final-test session
|
| 2 |
+
|
| 3 |
+
Polaris Circuits (Burlington, 22 nm) has escalated PO22-260218-19 for final test and binning. The shift record points to a possible final test yield loss while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-POLARIS
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-087/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-POLARIS",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "PO22-260218-19",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-087"
|
| 21 |
+
}
|
assets/tasks/semikongbench-088/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-POLARIS",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "PO22-260218-19",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-088"
|
| 21 |
+
}
|
assets/tasks/semikongbench-089/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-089 — Open CAPA for a recurring defect
|
| 2 |
+
|
| 3 |
+
Polaris Circuits (Burlington, 22 nm) has escalated PO22-260218-19 for failure analysis and capa. The shift record points to a possible recurring defect while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-POLARIS
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|
assets/tasks/semikongbench-089/20-starting-snapshot.json
ADDED
|
@@ -0,0 +1,21 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
{
|
| 2 |
+
"as_of": "2026-02-18T14:00:00Z",
|
| 3 |
+
"fab_id": "FAB-POLARIS",
|
| 4 |
+
"logical_systems": [
|
| 5 |
+
"semikongbench",
|
| 6 |
+
"fab_documents",
|
| 7 |
+
"mes",
|
| 8 |
+
"metrology",
|
| 9 |
+
"spc",
|
| 10 |
+
"equipment",
|
| 11 |
+
"materials",
|
| 12 |
+
"final_test",
|
| 13 |
+
"quality",
|
| 14 |
+
"supply_chain",
|
| 15 |
+
"collaboration"
|
| 16 |
+
],
|
| 17 |
+
"lot_id": "PO22-260218-19",
|
| 18 |
+
"sealed_gold_values_excluded": true,
|
| 19 |
+
"synthetic": true,
|
| 20 |
+
"task_id": "semikongbench-089"
|
| 21 |
+
}
|
assets/tasks/semikongbench-100/19-task-brief.md
ADDED
|
@@ -0,0 +1,6 @@
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
+
# semikongbench-100 — Quarantine a shipment with a custody gap
|
| 2 |
+
|
| 3 |
+
Summit Wafer (Lehi, 16 nm) has escalated SU16-260218-27 for supply traceability. The shift record points to a possible chain of custody gap while an older control revision is still present in the evidence room. Establish the operative authority, reconcile the lot, process, metrology, SPC, and workflow-specific records, calculate the primary and corroborating exception values, and choose the safe operating disposition. If the current evidence supports action, update only the authorized semiconductor record, record the disposition, and prepare a review-only handoff for the shift lead. Leave unrelated fabs, lots, equipment, materials, and evidence unchanged; do not claim completion until every mutation and the structured answer have been read back.
|
| 4 |
+
|
| 5 |
+
Synthetic fab: FAB-SUMMIT
|
| 6 |
+
As of: 2026-02-18T14:00:00Z
|