FrontierOR / metadata /hardset /hard_selection_inputs_180.csv
frontieror's picture
Rename hard subset metadata to metadata/hardset
d71ca3d verified
Raw History Blame Contribute Delete
38.9 kB
paper_id,paper_title,problem_class,category,formulation_type,application_field,avg_num_var,avg_num_int_var,avg_num_constr,large_records,timeout_or_nonoptimal_count,timeout_or_nonoptimal_frac,median_gurobi_time,mean_gurobi_time,max_gurobi_time
adulyasak2015,Benders Decomposition for Production Routing Under Demand Uncertainty,Lot Sizing / Inventory,operational,Stochastic/Robust/DRO,Supply Chain & Inventory,920934,8934,953310,5,5,1.0,3614.41,3617.324,3628.54
alba2013,A Branch-and-Cut Algorithm for the Double Traveling Salesman Problem with Multiple Stacks,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,840,840,544,5,0,0.0,499.9,783.1960000000001,2511.67
alfieri2020,Enhancing Column Generation by a Machine-Learning-Based Pricing Heuristic for Graph Coloring,Graph Optimization,operational,IP,Foundational / Theoretical,36018,36018,721747,5,5,1.0,3609.59,3609.756,3615.22
amaldi2013,Column Generation for the Minimum Hyperplanes Clustering Problem,Other (Clustering),planning,MIP,Foundational / Theoretical,10300,10050,30249,5,4,0.8,3601.32,2910.314,3602.07
araujo2015,Period Decompositions for the Capacitated Lot Sizing Problem with Setup Times,Lot Sizing / Inventory,planning,MIP,Manufacturing & Production,2172,720,1512,5,4,0.8,3600.82,2881.7760000000003,3601.78
araujo2020,Strong Bounds for Resource Constrained Project Scheduling: Preprocessing and Cutting Planes,Other (Project Scheduling),strategic,MIP,Manufacturing & Production,290244,290244,146754,5,0,0.0,54.31,84.74600000000001,191.58
archetti2007,A Branch-and-Cut Algorithm for a Vendor-Managed Inventory-Routing Problem,Lot Sizing / Inventory,operational,MIP,Supply Chain & Inventory,8613,7956,11981,5,2,0.4,2996.36,2434.252,3601.1
armbruster2012,LP and SDP branch-and-cut algorithms for the minimum graph bisection problem: a computational comparison,Graph Optimization,planning,SDP,Foundational / Theoretical,129581,129581,451734,5,5,1.0,3615.76,3614.918,3622.93
arslan2021,Decomposition-based approaches for a class of two-stage robust binary optimization problems,Stochastic / Robust / Bilevel Optimization,planning,Stochastic/Robust/DRO,Foundational / Theoretical,1081,270,811,5,1,0.2,93.8,829.742,3600.0
bard2002,A Branch-and-Cut Procedure for the Vehicle Routing Problem with Time Windows,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,3998,3798,13699,5,5,1.0,3600.51,3600.772,3601.66
barnhart2000,Using Branch-and-Price-and-Cut to Solve Origin-Destination Integer Multicommodity Flow Problems,Network Design & Flow,planning,IP,Transportation & Logistics,76635,76635,29380,5,0,0.0,543.18,583.954,1647.34
bayani2024,A Dual Bounding Framework Through Cost Splitting for Binary Quadratic Optimization,Other (Quadratic Optimization),planning,QP/MIQP,Foundational / Theoretical,74725,700,222125,5,5,1.0,3601.49,3601.59,3602.29
belhoul2014,An efficient procedure for finding best compromise solutions to the multi-objective assignment problem,Other (Assignment),strategic,IP,Foundational / Theoretical,1265626,1265625,2252,5,1,0.2,49.42,759.176,3625.56
belvaux2000,bc-prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems,Lot Sizing / Inventory,strategic,MIP,Manufacturing & Production,3300,1800,3990,5,4,0.8,3600.23,3093.656,3600.34
bentert2022,Parameterized Algorithms for Power-Efficiently Connecting Wireless Sensor Networks: Theory and Experiments,Graph Optimization,planning,MIP,Telecommunications & Networking,8177,2701,10878,5,3,0.6,3574.69,2222.946,3601.14
bergman2019,An Exact Algorithm for the Quadratic Multiknapsack Problem with an Application to Event Seating,Packing / Cutting Stock,operational,QP/MIQP,Sports & Entertainment,350,350,45,5,5,1.0,3600.17,3600.164,3600.18
bertsimas2022,A Scalable Algorithm for Sparse Portfolio Selection,Portfolio Optimization,strategic,MIP,Finance & Investment,3000,1000,2,5,5,1.0,3606.96,3608.5880000000006,3612.11
bertsimas2024,A Stochastic Benders Decomposition Scheme for Large-Scale Stochastic Network Design,Network Design & Flow,planning,Stochastic/Robust/DRO,Telecommunications & Networking,1170900,900,322501,5,1,0.2,245.8,904.306,3604.19
bettinelli2017,A Branch-and-Bound Algorithm for the Knapsack Problem with Conflict Graph,Packing / Cutting Stock,planning,BIP,Foundational / Theoretical,500,500,18436,5,5,1.0,3610.9,3609.386,3614.98
bierwirth2017,Extended GRASP for the Job Shop Scheduling Problem with Total Weighted Tardiness Objective,Scheduling (Machine / Crew / Workforce),operational,CP,Manufacturing & Production,4710,4350,9060,5,5,1.0,3600.35,3600.574,3601.4
bode2012,Cut-First Branch-and-Price-Second for the Capacitated Arc-Routing Problem,Vehicle Routing & TSP,operational,IP,Transportation & Logistics,350,350,112,5,0,0.0,1.86,130.5,416.31
bodur2017,Strengthened Benders Cuts for Stochastic Integer Programs with Continuous Recourse,Stochastic / Robust / Bilevel Optimization,strategic,Stochastic/Robust/DRO,Foundational / Theoretical,3750050,50,150001,5,0,0.0,205.16,192.486,360.24
boland2019,Bi-objective branch-and-cut algorithms based on LP relaxation and bound sets,Facility Location,planning,MIP,Supply Chain & Inventory,7260,7260,7380,5,5,1.0,3600.23,3600.476,3601.24
bollapragada2001,Optimal Design of Truss Structures by Logic-Based Branch and Cut,Other (Structural Design),planning,MIP,Foundational / Theoretical,6840,2160,11004,5,3,0.6,3600.28,2282.588,3600.31
borndorfer2007,A Column-Generation Approach to Line Planning in Public Transport,Other (Line Planning),planning,IP,Public Transit & Mobility,166848,50569,61961,5,5,1.0,3602.66,3602.74,3603.38
bragin2022,"Surrogate ""Level-Based"" Lagrangian Relaxation for mixed-integer linear programming",Other (General MIP),planning,MIP,Foundational / Theoretical,128000,128000,1680,5,1,0.2,1.81,721.5840000000001,3601.08
brandao2016,Bin Packing and Related Problems: General Arc-flow Formulation with Graph Compression,Packing / Cutting Stock,planning,IP,Foundational / Theoretical,82000,82000,7165,5,0,0.0,161.55,269.98,766.69
bront2009,A Column Generation Algorithm for Choice-Based Network Revenue Management,Other (Revenue Management),strategic,IP,Retail & Revenue Management,1,0,13,5,0,0.0,147.8,147.926,234.42
buchheim2018,Quadratic Combinatorial Optimization Using Separable Underestimators,Other (Quadratic Optimization),planning,QP/MIQP,Foundational / Theoretical,420,420,225,5,3,0.6,3600.56,2810.212,3600.82
byeon2022,Benders Subproblem Decomposition for Bilevel Problems with Convex Follower,Stochastic / Robust / Bilevel Optimization,planning,Bilevel/Multi-level,Foundational / Theoretical,6828,774,10693,5,0,0.0,428.68,375.908,852.04
caprara1999,Exact Solution of the Quadratic Knapsack Problem,Other (Quadratic Knapsack),planning,QP/MIQP,Foundational / Theoretical,90000,90000,134851,5,0,0.0,16.28,363.504,1590.59
carosi2019,A matheuristic for integrated timetabling and vehicle scheduling,Vehicle Scheduling,strategic,MIP,Public Transit & Mobility,1042742,53088,19982,5,4,0.8,3606.05,2890.862,3609.85
carvalho1999,Exact solution of bin-packing problems using column generation and branch-and-bound,Packing / Cutting Stock,planning,IP,Foundational / Theoretical,38404,38404,1232,5,0,0.0,18.62,378.24,1400.5
carvalho2022,Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup,Lot Sizing / Inventory,strategic,MIP,Manufacturing & Production,30390,13290,23333,5,5,1.0,3600.6,3601.014,3602.62
castro2021,A specialized interior-point algorithm for huge minimum convex cost flows in bipartite networks,Other (Network Flow),strategic,NLP/MINLP,Foundational / Theoretical,100000000,0,500200,5,1,0.2,1643.35,2063.23,3600.0
chebil2015,A dynamic programming algorithm for the Knapsack Problem with Setup,Packing / Cutting Stock,planning,IP,Foundational / Theoretical,10030,10030,10001,5,0,0.0,2.59,445.812,2188.6
chebil2019,An exact approach for the 0–1 Knapsack Problem with Setups,Packing / Cutting Stock,planning,BIP,Foundational / Theoretical,50100,50100,50001,5,2,0.4,179.24,1482.72,3600.99
chen1999,Solving Parallel Machine Scheduling Problems by Column Generation,Other (Parallel Machine Scheduling),strategic,IP,Manufacturing & Production,101200,51600,149810,5,3,0.6,3601.87,2207.102,3602.08
cherkesly2015,Branch-Price-and-Cut Algorithms for the Pickup and Delivery Problem with Time Windows and Last-in-First-Out Loading,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,1048880,1029000,2415979,5,0,0.0,97.91,303.058,1135.31
colombi2017,The directed profitable rural postman problem with incompatibility constraints,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,8453,2635,8028,5,4,0.8,3600.27,2880.398,3600.49
contreras2011,Branch and Price for Large-Scale Capacitated Hub Location Problems with Single Assignment,Facility Location,planning,MIP,Transportation & Logistics,2561600,1600,131241,5,0,0.0,580.75,552.21,691.65
cordeau2006,A Branch-and-Cut Algorithm for the Dial-a-Ride Problem,Vehicle Routing & TSP,operational,MIP,Public Transit & Mobility,11456,11260,4349,5,3,0.6,3600.74,2752.32,3600.99
cordeau2014,Analysis and Branch-and-Cut Algorithm for the Time-Dependent Travelling Salesman Problem,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,41412,41412,408,5,0,0.0,152.72,272.316,784.59
cordeau2019,Benders Decomposition for Very Large Scale Partial Set Covering and Maximal Covering Location Problems,Facility Location,planning,MIP,Public Service & Government,100100,100,100001,5,0,0.0,268.04,258.774,309.7
cote2018,The Meet-in-the-Middle Principle for Cutting and Packing Problems,Packing / Cutting Stock,planning,BIP,Foundational / Theoretical,67310,67310,21292,5,0,0.0,24.68,312.896,1509.23
cote2019,The Vehicle Routing Problem with Stochastic Two-Dimensional Items,Vehicle Routing & TSP,operational,Stochastic/Robust/DRO,Transportation & Logistics,56,55,11,5,0,0.0,185.19,236.79,596.57
cunha2021,"Valid inequalities, preprocessing, and an effective heuristic for the uncapacitated three-level lot-sizing and replenishment problem with a distribution structure",Lot Sizing / Inventory,planning,MIP,Supply Chain & Inventory,19890,6630,13260,5,5,1.0,3600.48,3600.4479999999994,3600.56
damcikurt2016,Strong Formulations for the Multistage Stochastic Self-Scheduling Unit Commitment,Energy & Unit Commitment,operational,Stochastic/Robust/DRO,Energy & Power Systems,3145724,2097149,11534314,5,2,0.4,866.51,1830.558,3600.0
dayarian2019,A Branch-Price-and-Cut Algorithm for a Production-Routing Problem with Short-Life-Span Products,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,19310,16964,35831,5,2,0.4,3599.18,2504.892,3601.21
degraeve2007,A New Dantzig-Wolfe Reformulation and Branch-and-Price Algorithm for the Capacitated Lot Sizing Problem with Set Up Times,Lot Sizing / Inventory,planning,MIP,Manufacturing & Production,1830,600,1220,5,2,0.4,76.42,1458.056,3601.09
delage2022,Logic-Based Benders Decomposition for Integrated Process Configuration and Production Planning Problems,Packing / Cutting Stock,strategic,CP,Manufacturing & Production,5910,2520,8400,5,5,1.0,3600.37,3600.5024179992674,3601.53
delorme2020,Enhanced Pseudo-polynomial Formulations for Bin Packing and Cutting Stock Problems,Packing / Cutting Stock,planning,IP,Foundational / Theoretical,1641755,1641755,5467,5,0,0.0,860.22,849.018,1901.23
desaulniers2010,Branch-and-Price-and-Cut for the Split-Delivery Vehicle Routing Problem with Time Windows,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,98817,92289,99008,5,5,1.0,3608.49,3611.072,3628.21
desaulniers2014,A Branch-Price-and-Cut Algorithm for the Inventory-Routing Problem,Lot Sizing / Inventory,operational,MIP,Supply Chain & Inventory,15753,7800,8709,5,5,1.0,3600.3,3600.304,3600.36
desaulniers2016,A Branch-Price-and-Cut Algorithm for the Inventory-Routing Problem,Lot Sizing / Inventory,operational,MIP,Supply Chain & Inventory,33213,31725,32868,5,5,1.0,3600.87,3601.0440000000003,3601.44
dienstknecht2024,Sharing in construction projects: On determining optimal container assignments for the on-site accommodation of trades,Other (Resource Assignment),strategic,MIP,Manufacturing & Production,14560,7378,23714,5,0,0.0,3.65,142.528,699.63
earl2005,Multi-vehicle Cooperative Control Using Mixed Integer Linear Programming,Other (Cooperative Control),operational,MIP,Aerospace & Aviation,44170,41174,122024,5,0,0.0,151.6,132.612,176.5
eiselt2009,A conditional p-hub location problem with attraction functions,Facility Location,planning,MIP,Aerospace & Aviation,195925,325,586201,5,5,1.0,3608.74,3609.138,3611.1
elci2022,Stochastic Planning and Scheduling with Logic-Based Benders Decomposition,Scheduling (Machine / Crew / Workforce),strategic,Stochastic/Robust/DRO,Manufacturing & Production,1525989,1525864,1617160,5,0,0.0,2000.18,2098.838,2848.13
engineer2012,A Branch-Price-and-Cut Algorithm for Single-Product Maritime Inventory Routing,Lot Sizing / Inventory,operational,MIP,Supply Chain & Inventory,13456,6588,14305,5,2,0.4,1632.81,1902.174,3600.47
fischetti1997,A Branch-and-Cut Algorithm for the Symmetric Generalized Traveling Salesman Problem,Vehicle Routing & TSP,operational,IP,Transportation & Logistics,96814,96814,39516,5,4,0.8,3602.97,2891.632,3603.23
fischetti1998,Solving the Orienteering Problem through Branch-and-Cut,Vehicle Routing & TSP,operational,IP,Transportation & Logistics,125250,125250,249503,5,0,0.0,125.23,112.878,229.83
fischetti2017,Redesigning Benders Decomposition for Large-Scale Facility Location,Facility Location,planning,MIP,Transportation & Logistics,933380,140,469953,5,3,0.6,3600.78,2652.232,3613.84
fleszar2022b,A branch-and-bound algorithm for the quadratic multiple knapsack problem,Packing / Cutting Stock,planning,QP/MIQP,Foundational / Theoretical,600,600,70,5,5,1.0,3600.27,3600.654,3602.28
forrest2006,A Column-Generation Approach to the Multiple Knapsack Problem with Color Constraints,Other (Knapsack),strategic,IP,Manufacturing & Production,82355,82355,75237,5,0,0.0,274.55,277.78200000000004,383.62
fragkos2016,A Horizon Decomposition Approach for the Capacitated Lot-Sizing Problem with Setup Times,Lot Sizing / Inventory,strategic,MIP,Manufacturing & Production,3010,1000,2110,5,5,1.0,3600.4,3600.4080000000004,3600.51
fragkos2021,A General Model and Efficient Algorithms for Reliable Facility Location Problem under Uncertain Disruptions,Facility Location,planning,Stochastic/Robust/DRO,Transportation & Logistics,10001,10000,0,5,5,1.0,3600.0,3600.0,3600.0
freeman2018,Attractive Orienteering Problem with Proximity and Timing Interactions,Vehicle Routing & TSP,strategic,MIP,Sports & Entertainment,234930,1710,692599,5,0,0.0,102.68,125.798,239.75
freling2003,A Branch-and-Price Algorithm for the Multiperiod Single-Sourcing Problem,Facility Location,strategic,MIP,Manufacturing & Production,1974,1890,219,5,0,0.0,117.59,199.12,716.28
frey2017,Column Generation for Outbound Baggage Handling at Airports,Other (Airport Scheduling),operational,MIP,Aerospace & Aviation,1205240,1156189,62996,5,0,0.0,175.01,167.174,294.29
furini2016,Modeling Two-Dimensional Guillotine Cutting Problems via Integer Programming,Packing / Cutting Stock,operational,MIP,Manufacturing & Production,3281559,3281559,37797,5,5,1.0,3622.53,3623.082,3625.87
furini2017,An Improved DSATUR-Based Branch-and-Bound Algorithm for the Vertex Coloring Problem,Graph Optimization,planning,BIP,Foundational / Theoretical,1029,1029,14465,5,0,0.0,73.66,157.552,381.42
furini2019,A Branch and Bound Algorithm for the Maximum Clique Problem,Graph Optimization,planning,BIP,Foundational / Theoretical,1000,1000,349500,5,4,0.8,3603.47,2887.588,3605.95
furini2021,A branch-and-cut algorithm for the Edge Interdiction Clique Problem,Graph Optimization,planning,BIP,Foundational / Theoretical,2543,2543,2,5,5,1.0,3600.18,3600.1979999999994,3600.27
gamache1999,A Column Generation Approach for Large-Scale Aircrew Rostering Problems,Scheduling (Machine / Crew / Workforce),strategic,MIP,Aerospace & Aviation,228907,228875,82,5,0,0.0,105.24,113.68,226.37
gangammanavar2020,Stochastic Decomposition for Two-Stage Stochastic Linear Programs with Random Cost Coefficients,Stochastic / Robust / Bilevel Optimization,planning,Stochastic/Robust/DRO,Foundational / Theoretical,3302127,0,76400,5,0,0.0,118.24,150.98,278.15
garcia2011,Solving Large p-Median Problems with a Radius Formulation,Facility Location,planning,MIP,Foundational / Theoretical,88397,300,88098,5,0,0.0,79.04,70.988,88.59
gruson2021,Benders decomposition for a stochastic three-level lot sizing and replenishment problem with a distribution structure,Lot Sizing / Inventory,planning,Stochastic/Robust/DRO,Supply Chain & Inventory,4825320,1320,4824088,5,0,0.0,803.57,883.4800000000001,1804.13
gschwind2021,A Branch-and-Price Framework for Decomposing Graphs into Relaxed Cliques,Graph Optimization,operational,MIP,Foundational / Theoretical,500,0,500,5,0,0.0,2520.32,2520.342,2520.5
gualandi2012,Exact Solution of Graph Coloring Problems via Constraint Programming and Column Generation,Graph Optimization,planning,CP,Foundational / Theoretical,10251,10251,634540,5,3,0.6,3604.67,2166.864,3606.01
guo2021,Logic-based Benders Decomposition and Binary Decision Diagram Based Approaches for Stochastic Distributed Operating Room Scheduling,Scheduling (Machine / Crew / Workforce),operational,Stochastic/Robust/DRO,Healthcare,568286,568286,575895,5,5,1.0,3607.83,3608.42,3610.43
hadjar2006,A Branch-and-Cut Algorithm for the Multiple Depot Vehicle Scheduling Problem,Vehicle Scheduling,operational,MIP,Public Transit & Mobility,780210,780210,4212,5,0,0.0,771.11,1340.278,3558.73
hassannayebi2016,Variable and adaptive neighbourhood search algorithms for rail rapid transit timetabling problem,Vehicle Scheduling,strategic,MIP,Public Transit & Mobility,585,0,584,5,4,0.8,3601.0,2883.956,3601.11
he2020,Branch-and-Cut-and-Price for the Vehicle Routing Problem with Time Windows and Convex Node Costs,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,27962,27930,28949,5,5,1.0,3624.26,3615.642,3625.19
hewitt2024,Production planning under demand and endogenous supply uncertainty,Stochastic / Robust / Bilevel Optimization,strategic,Stochastic/Robust/DRO,Manufacturing & Production,307640,2590,551595,5,5,1.0,3608.19,3609.584,3615.4
hoffman1993,Solving Airline Crew Scheduling Problems by Branch-and-Cut,Scheduling (Machine / Crew / Workforce),strategic,MIP,Aerospace & Aviation,15000,15000,100,5,3,0.6,3600.59,2163.082,3600.89
hosseinian2020,A Lagrangian Bound on the Clique Number and an Exact Algorithm for the Maximum Edge Weight Clique Problem,Graph Optimization,planning,MIP,Foundational / Theoretical,40300,40300,119700,5,5,1.0,3601.49,3601.41,3601.83
huisman2005,Multiple-Depot Integrated Vehicle and Crew Scheduling,Vehicle Scheduling,operational,MIP,Public Transit & Mobility,287214,287214,1512,5,0,0.0,100.9,725.4639999999999,2904.72
ji2019,Exact and heuristic methods for optimizing lock-quay system in inland waterway,Other (Container Terminal),strategic,MIP,Transportation & Logistics,3738,2274,7261,5,5,1.0,3600.85,3601.126,3602.31
juvin2023,Logic-based Benders decomposition for the preemptive Flexible Job-Shop Scheduling Problem,Scheduling (Machine / Crew / Workforce),operational,CP,Manufacturing & Production,39828,39827,111343,5,0,0.0,68.35,71.914,139.98
kang2021,An Exact Algorithm for Heterogeneous Drone-Truck Routing Problem,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,7654,7551,2809,5,4,0.8,3600.71,3145.0080000000003,3601.12
klose2005,Lower Bounds for the Capacitated Facility Location Problem Based on Column Generation,Facility Location,planning,MIP,Transportation & Logistics,1125750,750,1127251,5,3,0.6,3614.82,2342.6220000000003,3615.21
knueven2020,On Mixed Integer Programming Formulations for the Unit Commitment Problem,Energy & Unit Commitment,operational,MIP,Energy & Power Systems,450144,129600,623040,5,0,0.0,1229.34,1368.746,2394.99
kobayashi2021,Bilevel Cutting-plane Algorithm for Solving Cardinality-constrained Mean-CVaR Portfolio Optimization Problems,Portfolio Optimization,strategic,Bilevel/Multi-level,Finance & Investment,10452,225,10229,5,1,0.2,99.46,806.906,3602.9
kobeaga2024,A revisited branch-and-cut algorithm for large-scale orienteering problems,Graph Optimization,operational,MIP,Foundational / Theoretical,45150,45150,90002,5,4,0.8,3603.45,3564.32,3610.69
kowalczyk2018,A Branch-and-Price Algorithm for Parallel Machine Scheduling Using ZDDs and Generic Branching,Scheduling (Machine / Crew / Workforce),strategic,IP,Manufacturing & Production,284784,284784,31,5,0,0.0,8.79,73.51599999999999,260.65
kowalczyk2024,A Flow-Based Formulation for Parallel Machine Scheduling Using Decision Diagrams,Scheduling (Machine / Crew / Workforce),strategic,IP,Manufacturing & Production,130970,65485,65536,5,1,0.2,235.66,1052.206,3606.3
kress2019,An Exact Solution Approach for Scheduling Cooperative Gantry Cranes,Other (Container Terminal),strategic,IP,Transportation & Logistics,47600,47029,65965,5,3,0.6,3608.56,2508.018,3608.75
kreter2018,Mixed-Integer Linear Programming and Constraint Programming Formulations for Solving Resource Availability Cost Problems,Other (Project Scheduling),planning,MIP,Manufacturing & Production,52059,52055,110513,5,5,1.0,3613.14,3611.944,3616.56
lai2021,Neighborhood decomposition based variable neighborhood search and tabu search for maximally diverse grouping,Other (Grouping / Partitioning),planning,MIP,Foundational / Theoretical,20000,20000,500,5,5,1.0,3616.42,3616.486,3616.7
laporte2003,A Branch-and-Cut Algorithm for the Undirected Traveling Purchaser Problem,Vehicle Routing & TSP,operational,IP,Transportation & Logistics,10091,5050,5440,5,2,0.4,437.81,1530.7,3601.46
lee1996,A Branch and Cut Algorithm for a Steiner Tree-Star Problem,Graph Optimization,planning,IP,Telecommunications & Networking,12985,70,15621,5,0,0.0,10.43,306.36800000000005,1493.67
legrain2020,A rotation-based branch-and-price approach for the nurse scheduling problem,Scheduling (Machine / Crew / Workforce),strategic,IP,Healthcare,176408,104672,183512,5,5,1.0,3602.37,3602.4300000000003,3602.62
legrain2024,A dedicated pricing algorithm to solve a large family of nurse scheduling problems with branch-and-price,Scheduling (Machine / Crew / Workforce),strategic,IP,Healthcare,99298,60736,92762,5,2,0.4,391.68,1548.0700000000002,3601.86
letelier2022,Bin Packing Problem with Time Lags,Packing / Cutting Stock,planning,BIP,Transportation & Logistics,188544,188544,26914,5,4,0.8,3602.85,2921.5080000000003,3604.07
levin2017,Congestion-aware system optimal route choice for shared autonomous vehicles,Vehicle Routing & TSP,operational,NLP/MINLP,Transportation & Logistics,9451376,0,3920817,5,0,0.0,141.69,157.98399999999998,190.04
li2020,A bi-level model and solution methods for partial interdiction problem on capacitated hierarchical facilities,Stochastic / Robust / Bilevel Optimization,planning,Bilevel/Multi-level,Public Service & Government,10171,140,9977,5,4,0.8,3600.29,2881.476,3600.65
liao2020,A Distributionally Robust Optimization Approach for Outpatient Colonoscopy Scheduling,Stochastic / Robust / Bilevel Optimization,operational,Stochastic/Robust/DRO,Healthcare,6104,729,18848,5,0,0.0,541.78,1090.206,2797.37
lozano2017,A Value-Function-Based Exact Approach for the Bilevel Mixed-Integer Programming Problem,Stochastic / Robust / Bilevel Optimization,planning,Bilevel/Multi-level,Foundational / Theoretical,4658,0,1862,5,0,0.0,265.48,373.77,884.13
luo2017,Branch and Price and Cut for the Split-Delivery Vehicle Routing Problem with Time Windows and Linear Weight-Related Cost,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,42867,20856,44054,5,3,0.6,3601.0,2354.498,3617.51
mansini2020,A Core-Based Exact Algorithm for the Multidimensional Multiple Choice Knapsack Problem,Packing / Cutting Stock,planning,IP,Foundational / Theoretical,612000,612000,12051,5,0,0.0,130.21,248.728,672.97
martello1999,Dynamic Programming and Strong Bounds for the 0-1 Knapsack Problem,Packing / Cutting Stock,planning,IP,Foundational / Theoretical,10000000,10000000,1,5,0,0.0,233.24,773.716,2280.01
martin-iradi2024,An adaptive large neighborhood search heuristic for the multi-port continuous berth allocation problem,Other (Container Terminal),strategic,MIP,Transportation & Logistics,9067,8500,10721,5,5,1.0,3601.1,3601.144,3601.9
mehrotra1996,A Column Generation Approach for Graph Coloring,Graph Optimization,planning,IP,Foundational / Theoretical,98,0,250,5,0,0.0,876.65,684.174,1044.82
mingozzi1999,An Exact Method for the Vehicle Routing Problem with Backhauls,Vehicle Routing & TSP,operational,IP,Transportation & Logistics,9866126,9866126,33,5,0,0.0,187.29,191.536,340.58
morrison2016,Solving the Pricing Problem in a Branch-and-Price Algorithm for Graph Coloring using Zero-Suppressed Binary Decision Diagrams,Graph Optimization,planning,IP,Foundational / Theoretical,4497833,4497833,300,5,1,0.2,97.21,813.7239999999999,3558.52
muter2010,Combination of Metaheuristic and Exact Algorithms for Solving Set Covering-Type Optimization Problems,Other (Set Covering / Partitioning),operational,BIP,Transportation & Logistics,526526,526526,33,5,1,0.2,899.11,1473.418,3563.48
nagy2015,The Vehicle Routing Problem with Divisible Deliveries and Pickups,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,477603,159201,240399,5,5,1.0,3604.89,3605.03,3605.92
oliveira2020,An Improved Branch-Cut-and-Price Algorithm for Parallel Machine Scheduling Problems,Scheduling (Machine / Crew / Workforce),strategic,BIP,Manufacturing & Production,71116,71116,5381,5,0,0.0,84.69,99.894,203.58
ozturk2020,A truncated column generation algorithm for the parallel batch scheduling problem to minimize total flow time,Scheduling (Machine / Crew / Workforce),operational,BIP,Manufacturing & Production,10450,10000,30446,5,5,1.0,3600.98,3601.006,3601.4
pecin2017,New Enhancements for the Exact Solution of the Vehicle Routing Problem with Time Windows,Vehicle Routing & TSP,operational,BIP,Transportation & Logistics,40605,40201,81207,5,5,1.0,3601.61,3603.214,3607.53
pedersen2024,An efficient solver for large-scale onshore wind farm siting including cable routing,Network Design & Flow,planning,MIP,Energy & Power Systems,878414,439532,440844,5,0,0.0,1387.68,1439.802,2086.44
pessoa2021,Branch-cut-and-price for the robust capacitated vehicle routing problem with knapsack uncertainty,Vehicle Routing & TSP,operational,Stochastic/Robust/DRO,Transportation & Logistics,6560,6480,6482,5,3,0.6,3600.65,2168.278,3601.37
pettersson2020,Multiobjective Integer Programming: Synergistic Parallel Approaches,Other (General MIP),planning,IP,Foundational / Theoretical,10000000,10000000,1,5,0,0.0,139.47,139.552,141.31
pinnoi1997,A Branch and Cut Approach for Workload Smoothing on Assembly Lines,Other (Assembly Line Balancing),planning,MIP,Manufacturing & Production,896,895,192,5,1,0.2,0.48,720.5600000000001,3600.35
potthoff2010,Column Generation with Dynamic Duty Selection for Railway Crew Rescheduling,Scheduling (Machine / Crew / Workforce),operational,BIP,Public Transit & Mobility,35948,35948,103,5,0,0.0,36.14,116.856,489.06
rahimian2017,A Hybrid Integer Programming and Variable Neighbourhood Search Algorithm to Solve Nurse Rostering Problems,Other (Nurse Rostering),strategic,MIP,Healthcare,112684,112684,166431,5,1,0.2,22.65,734.66,3602.25
rahmaniani2017,Benders Decomposition for Large-Scale Uncapacitated Hub Location,Facility Location,planning,MIP,Transportation & Logistics,3139014,100,499951,5,0,0.0,68.09,76.074,143.59
rahmaniani2018,A computationally efficient Benders decomposition for energy systems planning problems with detailed operations and time-coupling constraints,Energy & Unit Commitment,planning,MIP,Energy & Power Systems,69793,159,122237,5,0,0.0,182.66,184.822,257.55
rahmaniani2020,The Benders Dual Decomposition Method,Stochastic / Robust / Bilevel Optimization,planning,Stochastic/Robust/DRO,Foundational / Theoretical,1750050,50,52501,5,1,0.2,327.03,1359.878,3609.91
rahmaniani2022,A computationally efficient Benders decomposition for energy systems planning problems with detailed operations and time-coupling constraints,Energy & Unit Commitment,planning,MIP,Energy & Power Systems,47208,108,115427,5,0,0.0,153.07,207.096,484.75
reihaneh2019,A Branch-and-Price Algorithm for a Vehicle Routing with Demand Allocation Problem,Vehicle Routing & TSP,operational,BIP,Transportation & Logistics,12800,5150,26637,5,5,1.0,3600.83,3600.946,3601.2
reinhardt2016,The Edge Set Cost of the Vehicle Routing Problem with Time Windows,Vehicle Routing & TSP,operational,BIP,Transportation & Logistics,67248,65608,66395,5,5,1.0,3601.71,3601.722,3601.89
ribeiro1994,A Column Generation Approach to the Multiple-Depot Vehicle Scheduling Problem,Vehicle Scheduling,strategic,BIP,Public Transit & Mobility,537318,537318,4518,5,0,0.0,53.6,101.316,244.93
riley2025,Integer L-Shaped Method with Non-Supporting No-Good Optimality Cuts,Stochastic / Robust / Bilevel Optimization,planning,Stochastic/Robust/DRO,Supply Chain & Inventory,10357863,3969663,370020,5,0,0.0,167.87,217.864,323.49
roberti2015,The Fixed Charge Transportation Problem: An Exact Algorithm Based on a New Integer Programming Formulation,Other (Transportation),planning,MIP,Transportation & Logistics,9800,4900,5040,5,5,1.0,3600.27,3600.288,3600.35
roberti2018,A branch-and-cut algorithm for the two-echelon capacitated vehicle routing problem with grouping constraints,Vehicle Routing & TSP,operational,BIP,Transportation & Logistics,6600,3550,21345,5,5,1.0,3600.41,3600.468,3600.61
roberti2021,Exact Methods for the Traveling Salesman Problem with Drone,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,478,462,602,5,1,0.2,128.33,813.4,3600.29
ropke2009,Branch and Cut and Price for the Pickup and Delivery Problem with Time Windows,Vehicle Routing & TSP,operational,BIP,Transportation & Logistics,216161,208593,424753,5,5,1.0,3608.36,3609.83,3615.61
roshanaei2017,Collaborative Operating Room Planning and Scheduling,Scheduling (Machine / Crew / Workforce),strategic,MIP,Healthcare,103862,101663,213791,5,5,1.0,3608.76,3608.782,3609.87
rostami2021,Stochastic single-allocation hub location,Facility Location,planning,Stochastic/Robust/DRO,Transportation & Logistics,5049600,49600,150501,5,0,0.0,784.83,808.97,994.76
rothenbacher2018,Branch-and-Price-and-Cut for the Truck-and-Trailer Routing Problem with Time Windows,Vehicle Routing & TSP,operational,BIP,Transportation & Logistics,268028,258932,1067602,5,5,1.0,3626.55,3626.724,3628.77
rothenbacher2019,Branch-and-Price-and-Cut for the Periodic Vehicle Routing Problem with Flexible Schedule Structures,Lot Sizing / Inventory,operational,BIP,Supply Chain & Inventory,64115,64115,214,5,0,0.0,1499.28,1528.7,1688.73
ruiz2007,An effective iterated greedy algorithm for the mixed no-idle permutation flowshop scheduling problem,Scheduling (Machine / Crew / Workforce),operational,CP,Manufacturing & Production,9167,7921,2656,5,3,0.6,3600.55,2427.78,3600.71
sadykov2013,Bin Packing with Conflicts: a Generic Branch-and-Price Algorithm,Packing / Cutting Stock,planning,BIP,Foundational / Theoretical,12210,12210,461889,5,5,1.0,3604.18,3606.676,3617.76
salemi2022,On the Structure of Decision Diagram-Representable Mixed Integer Programs with Application to Unit Commitment,Energy & Unit Commitment,strategic,MIP,Energy & Power Systems,489600,7200,1238956,5,4,0.8,3615.15,3475.842,3619.53
samarghandi2017,On the exact solution of the no-wait flow shop problem with due date constraints,Scheduling (Machine / Crew / Workforce),operational,IP,Manufacturing & Production,601,400,4271,5,5,1.0,3603.75,3603.132,3604.19
sansegundo2016,A new exact maximum clique algorithm for large and massive sparse graphs,Graph Optimization,operational,BIP,Foundational / Theoretical,4000,4000,7997482,5,0,0.0,112.8,126.898,188.73
sansegundo2023,CliSAT: A new exact algorithm for hard maximum clique problems,Graph Optimization,planning,BIP,Foundational / Theoretical,1000,1000,399124,5,3,0.6,3602.95,2217.63,3604.28
savelsbergh1997,A Branch-and-Price Algorithm for the Generalized Assignment Problem,Other (Generalized Assignment),strategic,MIP,Foundational / Theoretical,2000,2000,120,5,2,0.4,0.34,1440.83,3601.96
schwerdfeger2016,A fast and effective subset sum based improvement procedure for workload balancing on identical parallel machines,Scheduling (Machine / Crew / Workforce),strategic,IP,Manufacturing & Production,3934,3920,294,5,0,0.0,26.5,534.712,2519.19
segundo2019,A new branch-and-bound algorithm for the maximum edge-weighted clique problem,Graph Optimization,planning,BIP,Foundational / Theoretical,627430,627430,3748680,5,5,1.0,3628.6,3628.524,3629.16
segundo2019b,A new branch-and-bound algorithm for the Maximum Weighted Clique Problem,Graph Optimization,planning,BIP,Foundational / Theoretical,3000,3000,3600074,5,4,0.8,3616.78,3138.2200000000003,3626.09
seker2021,An Exact Cutting Plane Algorithm to Solve the Selective Graph Coloring Problem in Perfect Graphs,Graph Optimization,planning,BIP,Foundational / Theoretical,33567,33567,5768230,5,0,0.0,84.04,476.5100000000001,2028.83
song2021,Polyhedral Results and Branch-and-Cut for the Resource Loading Problem,Other (Resource Loading),strategic,MIP,Manufacturing & Production,69536,62367,14563,5,1,0.2,16.75,731.5600000000001,3601.21
spliet2015,The Time Window Assignment Vehicle Routing Problem,Vehicle Routing & TSP,operational,Stochastic/Robust/DRO,Transportation & Logistics,2131,1950,4053,5,5,1.0,3601.01,3601.068,3601.32
taninmis2022,A Nested Cross Decomposition Algorithm for Power System Capacity Expansion with Multiscale Uncertainties,Energy & Unit Commitment,planning,Stochastic/Robust/DRO,Energy & Power Systems,3747938,1113649,6714930,5,0,0.0,3435.42,3361.778,3561.12
tran2018,An Efficient Heuristic Algorithm for the Alternative-Fuel Station Location Problem,Facility Location,planning,MIP,Transportation & Logistics,4160,1000,56280,5,0,0.0,75.82,149.826,358.52
vidal2011,A Hybrid Genetic Algorithm for Multi-Depot and Periodic Vehicle Routing Problems,Vehicle Routing & TSP,operational,MIP,Transportation & Logistics,70548,70548,4412,5,5,1.0,3601.31,3601.442,3602.03
walteros2020,Why Is Maximum Clique Often Easy in Practice?,Graph Optimization,planning,BIP,Foundational / Theoretical,3000,3000,4497847,5,0,0.0,37.58,59.196000000000005,96.74
wang2018,"Column Generation for the Integrated Berth Allocation, Quay Crane Assignment, and Yard Assignment Problem",Other (Container Terminal),strategic,MIP,Transportation & Logistics,6684,6576,5866,5,4,0.8,3604.44,3164.424,3604.48
wang2019,A hybrid algorithm for large-scale service network design considering a heterogeneous fleet,Network Design & Flow,planning,MIP,Transportation & Logistics,328000,8000,17200,5,5,1.0,3602.56,3602.332,3602.69
wang2025,An efficient branch-and-cut algorithm for approximately submodular function maximization,Other (Submodular Optimization),strategic,BIP,Foundational / Theoretical,61,60,10,5,2,0.4,495.68,1539.362,3600.46
wangk2020,A Stochastic Integer Programming Approach to Air Traffic Scheduling and Operations,Vehicle Scheduling,operational,Stochastic/Robust/DRO,Aerospace & Aviation,2270298,1861248,6929616,5,0,0.0,238.96,333.798,486.24
wangy2020,The Rank-One Quadratic Assignment Problem,Other (Quadratic Assignment),planning,QP/MIQP,Foundational / Theoretical,4000035,4000017,4070,5,0,0.0,100.99,125.53,210.58
watermeyer2020,A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints,Other (Project Scheduling),operational,CP,Manufacturing & Production,149432,149432,150393,5,5,1.0,3604.59,3604.594,3605.84
watermeyer2022,A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints,Other (Project Scheduling),operational,CP,Manufacturing & Production,124616,124616,38024,5,0,0.0,140.0,163.72,261.21
watermeyer2023,A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints,Other (Project Scheduling),operational,CP,Manufacturing & Production,30383,30383,3108,5,0,0.0,102.54,578.892,2427.53
wei2020,A New Branch-and-Price-and-Cut Algorithm for One-Dimensional Bin-Packing Problems,Packing / Cutting Stock,planning,BIP,Transportation & Logistics,670672,670672,2338,5,5,1.0,3602.59,3602.564,3603.61
wei2020b,A branch-and-price algorithm for the two-dimensional vector packing problem,Packing / Cutting Stock,planning,BIP,Transportation & Logistics,1440,1440,130,5,2,0.4,12.53,1444.924,3607.61
wu2018,Analytics Branching and Selection for the Capacitated Multi-Item Lot Sizing Problem with Nonidentical Machines,Lot Sizing / Inventory,planning,MIP,Manufacturing & Production,3850,1540,3192,5,5,1.0,3600.22,3600.218,3600.25
wu2022,A supervised learning-driven heuristic for solving the facility location and production planning problem,Facility Location,planning,MIP,Manufacturing & Production,659306,18848,56666,5,1,0.2,141.7,813.1600000000001,3628.0
wu2023,Optimal Scenario Reduction for One- and Two-Stage Robust Optimization,Stochastic / Robust / Bilevel Optimization,planning,Stochastic/Robust/DRO,Foundational / Theoretical,101,50,7551,5,0,0.0,1605.61,1432.65,1690.54
xie2019,A Branch-and-Price Algorithm for the Integrated Berth Allocation and Quay Crane Assignment Problem,Other (Container Terminal),strategic,MIP,Transportation & Logistics,125916,125756,229352,5,0,0.0,135.65,263.1,769.09
xu2024,An Efficient Global Optimal Method for Cardinality Constrained Portfolio Optimization,Portfolio Optimization,strategic,QP/MIQP,Finance & Investment,200,100,3,5,4,0.8,3600.7,2953.848,3601.81
yang2013,An effective GRASP and tabu search for the 0–1 quadratic knapsack problem,Other (Quadratic Knapsack),planning,QP/MIQP,Foundational / Theoretical,2000,2000,1,5,5,1.0,3605.41,3605.478,3608.56
zetina2019,Exact Algorithms based on Benders Decomposition for Multicommmodity Uncapacitated Fixed-charge Network Design,Network Design & Flow,planning,MIP,Telecommunications & Networking,1121400,1400,1160000,5,5,1.0,3615.01,3616.582,3622.1
zetina2020,Efficient Internal Strategies in Quantum Relaxation based Branch-and-Bound,Other (Quadratic Optimization),planning,QP/MIQP,Foundational / Theoretical,182,182,0,5,5,1.0,3601.15,3601.114,3601.27
zhang2025,A Unified Column Generation and Elimination Method for Solving Large-Scale Set Partitioning Problems,Other (Set Covering / Partitioning),planning,IP,Foundational / Theoretical,120000,120000,260,5,3,0.6,3605.76,2520.67,3607.23
zohali2022,Solving the Type-2 Assembly Line Balancing with Setups Using Logic-Based Benders Decomposition,Other (Assembly Line Balancing),planning,MIP,Manufacturing & Production,325571,325570,15434,5,5,1.0,3601.99,3602.054,3602.3