Download tasks/castro2021/instance_schema.json from frontieror/FrontierOR: direct link, hf CLI and curl.
- Browser
- Download file 1.62 kB
-
https://huggingface.co/datasets/frontieror/FrontierOR/resolve/main/tasks/castro2021/instance_schema.json
- Command line
-
hf download hf://datasets/frontieror/FrontierOR/tasks/castro2021/instance_schema.json
-
curl -L -o instance_schema.json https://huggingface.co/datasets/frontieror/FrontierOR/resolve/main/tasks/castro2021/instance_schema.json
1.62 kB
| { | |
| "n": "<int> Number of suppliers in the transportation network.", | |
| "m": "<int> Number of customers in the transportation network.", | |
| "num_arcs": "<int> Total number of shipping arcs in the bipartite network, equal to n times m.", | |
| "num_variables": "<int> Total number of flow variables in the model, equal to n times m plus n.", | |
| "num_constraints": "<int> Total number of constraints in the model, equal to m plus n.", | |
| "cost_type": "<str> Type of arc cost function used: 'linear_integer', 'linear_fractional', or 'quadratic'.", | |
| "relative_demand_slack": "<float> Ratio of excess total supply beyond total demand to total supply.", | |
| "total_supply": "<int> Sum of all supplier capacities.", | |
| "total_demand": "<int> Sum of all customer demands.", | |
| "arc_capacity": "<int> Upper bound on the flow that can be shipped on any single arc.", | |
| "supplier_locations": "<list[list[float]], shape [n][2]> Two-dimensional spatial coordinates for each supplier.", | |
| "customer_locations": "<list[list[float]], shape [m][2]> Two-dimensional spatial coordinates for each customer.", | |
| "supplies": "<list[int], length n> Maximum total flow that each supplier can ship across all its outgoing arcs.", | |
| "demands": "<list[int], length m> Quantity of flow that must arrive at each customer from all suppliers combined.", | |
| "linear_costs": "<list[list[int|float]], shape [n][m]> Per-unit shipping cost on the arc from each supplier to each customer.", | |
| "quadratic_costs": "<list[list[int|float]], shape [n][m]> Quadratic cost coefficient on the arc from each supplier to each customer, applied to the square of the flow." | |
| } | |