| Key Concepts | |
| ============ | |
| .. currentmodule:: hensmith | |
| This page collects the ideas hensmith implements: what a minimum approach | |
| temperature is, how the problem table turns a set of process streams into | |
| utility targets and a pinch, how :func:`~hensmith.synthesize_network` turns | |
| those targets into a network of exchangers, and what the result is and is not | |
| guaranteed to be. Everything below describes the behavior of the code in | |
| ``hensmith/hxn_synthesis.py`` and ``hensmith/_heat_exchanger_network.py``, and | |
| of their two private helpers, ``hensmith/_curves.py`` (the stream curves) and | |
| ``hensmith/_planner.py`` (the network planner); the :doc:`tutorial/index` | |
| shows the same concepts on a running system. | |
| Heat integration and the minimum approach temperature | |
| ----------------------------------------------------- | |
| Every heating and cooling duty in a flowsheet is paid for with a utility: | |
| steam, cooling water, chilled water, refrigerant. Heat integration replaces | |
| part of that spending with process-to-process exchange -- heat taken from a | |
| stream that must be cooled and given to a stream that must be heated. What is | |
| left after the process exchangers have done as much as they can is the | |
| irreducible utility demand. | |
| Heat only flows down a temperature gradient, and a finite exchanger can only | |
| transfer heat across a finite temperature difference: the closer the two | |
| streams are in temperature, the more area is needed for the same duty, since | |
| the area of a counter-current exchanger scales as | |
| :math:`Q / (U \Delta T_{lm})`. hensmith expresses that limit as a single | |
| number, the minimum approach temperature ``T_min_app`` (in K, default ``5.``), | |
| used to shift hot streams in the problem table and required between the | |
| streams everywhere inside every synthesized exchanger: | |
| - in :func:`~hensmith.problem_table`, where every hot stream's temperature is | |
| shifted *down* by ``T_min_app`` before the streams are compared, so that two | |
| streams which meet on the shifted scale are really ``T_min_app`` apart; | |
| - in the planner of :func:`~hensmith.synthesize_network`, which admits a | |
| match only if the two streams stay at least ``T_min_app`` apart at every | |
| breakpoint of their temperature-enthalpy curves along the whole exchanger, | |
| not only at its two ends; and | |
| - on every synthesized process exchanger, whose approach is verified on the | |
| exact states of its two streams, again along its whole length. The | |
| exchanger itself is a ``biosteam.HXprocess`` constructed with | |
| ``dT=T_min_app - 1e-6``, a guard against rounding only. | |
| Lowering ``T_min_app`` lowers the utility targets and raises exchanger area; | |
| raising it does the reverse. It is the parameter in hensmith that sets the | |
| trade between utilities and capital, and because | |
| :class:`~hensmith.HeatExchangerNetwork` reports its capital as *added* cost | |
| and its utilities as *differences* (see below), both sides of that trade are | |
| visible in the facility's results. | |
| Shifted temperatures and the problem table | |
| ------------------------------------------ | |
| :func:`~hensmith.problem_table` builds the temperature-interval heat cascade | |
| of a set of streams, given each stream's inlet, its outlet quenched to | |
| equilibrium at its own enthalpy, a flag saying whether it is cooled, and | |
| ``T_min_app``. Its result is a :class:`~hensmith.ProblemTable`. | |
| **Stream curves.** Each stream is first described by a piecewise-linear | |
| temperature-enthalpy curve over its own enthalpy range, built once from a | |
| handful of flashes and evaluated afterwards without flashing. Its breakpoints | |
| are the stream's two end temperatures and every phase boundary inside its | |
| range (a pure component's saturation temperature, a mixture's bubble and dew | |
| points); a pure component's latent heat is a flat (isothermal) segment | |
| between its saturated-liquid and saturated-vapor enthalpies; a mixture's | |
| two-phase glide is sampled, and so is every curved single-phase stretch | |
| (temperature-dependent heat capacity), densely enough that linear | |
| interpolation stays within 0.002 K of the true curve. Inside its range the | |
| stream is taken at equilibrium with its enthalpy clipped to | |
| :math:`[H_{lo}, H_{hi}]`, so a stream copy at an interior temperature can | |
| never carry more enthalpy than the real stream ever has (a non-equilibrium | |
| outlet, for instance); what a non-equilibrium end state departs from | |
| equilibrium at its own end temperature becomes a flat there. | |
| **The shifted grid.** Hot streams are shifted down by ``T_min_app``; cold | |
| streams are not. The grid ``Ts`` is the sorted (descending) union of the | |
| shifted breakpoints of all curves, temperatures closer than 1e-9 K being one | |
| grid point. Every temperature at which any stream's curve bends or jumps is | |
| therefore a grid point, and between two consecutive grid points every stream | |
| is linear to within 0.002 K. A grid of the stream end temperatures alone | |
| would average a boiling point, a dew or bubble point, or the curvature of a | |
| glide that falls strictly inside an interval over that interval, which can | |
| hide a pinch and make the hot utility target too low. | |
| **Per-stream contributions.** Write :math:`H_j^-(T)` and :math:`H_j^+(T)` for | |
| the low- and high-enthalpy limits of stream :math:`j`'s curve at the *real* | |
| temperature :math:`T + \mathrm{shift}_j`; they differ only where the curve has | |
| a flat at that temperature, and they are :math:`H_{hi}` above and | |
| :math:`H_{lo}` below the stream's range. The heat a stream contributes to the | |
| open interval between grid temperatures :math:`T_k` and :math:`T_{k+1}`, and | |
| at the grid temperature :math:`T_k` itself, are | |
| .. math:: | |
| \mathrm{interval\_H}[j,k] = s_j \left( H_j^-(T_k) - H_j^+(T_{k+1}) \right), | |
| \qquad | |
| \mathrm{point\_H}[j,k] = s_j \left( H_j^+(T_k) - H_j^-(T_k) \right), | |
| with :math:`s_j = +1` for a hot stream and :math:`-1` for a cold one. The | |
| stream's own end points are grid points selected by position rather than by | |
| a float comparison, so the contributions telescope exactly: | |
| .. math:: | |
| \sum_k \mathrm{interval\_H}[j,k] + \sum_k \mathrm{point\_H}[j,k] | |
| = s_j \left| H_{out} - H_{in} \right|, | |
| that is, to the stream's duty. | |
| **Point loads.** ``point_H`` is nonzero only where a curve is flat: at a pure | |
| component's (shifted) saturation temperature, which receives its latent heat; | |
| at an end temperature where a non-equilibrium end state departs from | |
| equilibrium; and at the shifted outlet temperature of a *point-load stream* | |
| -- an isothermal stream, or one whose outlet temperature moves *against* its | |
| duty (a heated stream that leaves cooler than it entered, such as a reboiler | |
| outlet quenched to equilibrium) -- which has no interval to occupy and puts | |
| its whole duty :math:`s_j |H_{out} - H_{in}|` there. | |
| **The cascade.** Starting from zero hot utility, the heat leaving grid | |
| boundary :math:`T_k` (after that boundary's point loads) is | |
| .. math:: | |
| \mathrm{residual}[k] = \sum_j \sum_{i \le k} \mathrm{point\_H}[j,i] | |
| + \sum_j \sum_{i < k} \mathrm{interval\_H}[j,i]. | |
| Feasibility must hold for the heat *arriving* at each boundary as well, before | |
| its point loads are applied, | |
| .. math:: | |
| \mathrm{arriving}[k] = \mathrm{residual}[k] | |
| - \sum_j \mathrm{point\_H}[j,k], | |
| because a point source located at :math:`T_k` cannot serve a sink above | |
| :math:`T_k`. hensmith therefore takes the elementwise minimum of the two | |
| flows; the most negative value is the deficit hot utility must make up, | |
| .. math:: | |
| \mathrm{hot\_util\_load} = -\min_k \min(\mathrm{residual}[k], | |
| \mathrm{arriving}[k]), | |
| its first location is the pinch, and the heat left at the bottom of the | |
| cascade is the cold utility, | |
| :math:`\mathrm{cold\_util\_load} = \mathrm{residual}[-1] + | |
| \mathrm{hot\_util\_load}`. Whether that minimum is the arriving or the leaving | |
| flow at the pinch fixes the side of the pinch that the point loads *at* the | |
| pinch temperature belong to, the pinch *cut*. | |
| Because every stream is linear to within 0.002 K between grid points, the | |
| grid minimum of the cascade is the true one to within 0.002 K times the sum of | |
| the heat capacity flow rates; equivalently, the targets lie between the exact | |
| targets at ``T_min_app`` minus and plus 0.004 K (approximately: the 0.002 K | |
| tolerance is established by midpoint tests). For streams of constant heat | |
| capacity the curves are exact. | |
| **Threshold problems.** When that minimum is not negative -- or negative by no | |
| more than 1e-9 of the total stream duty -- no hot utility is needed at all. | |
| The table then reports zero hot utility and places the pinch at the top of the | |
| grid, ``Ts[0]``. A cold utility that comes out slightly negative through | |
| rounding is absorbed back into the hot utility so that the identity | |
| .. math:: | |
| \mathrm{hot\_util\_load} - \mathrm{cold\_util\_load} | |
| = \sum_j \text{(stream duty)} | |
| stays exact: the difference between the two targets is always the net heating | |
| demand of the whole set of streams. That identity is the table's own | |
| consistency check -- whatever the algorithm does with the cascade, it can | |
| neither invent nor destroy energy. | |
| Targets: MER, pinch, composite and grand composite curves | |
| --------------------------------------------------------- | |
| The two loads returned by the table are the **minimum energy requirement** | |
| (MER) targets: the least hot and cold utility any network operating with this | |
| ``T_min_app`` can use. They are available before a single exchanger has been | |
| placed, which is what makes pinch analysis a *targeting* method -- the target | |
| comes first, and the network is judged against it. | |
| The same information can be read graphically. The **composite curves** plot | |
| cumulative enthalpy against temperature for all hot streams together and all | |
| cold streams together, on the real temperature scale. Where the two curves | |
| overlap horizontally, heat can pass from hot to cold: that overlap is the heat | |
| recovered by process exchange. The overhang of the cold curve at its warm end | |
| is the hot utility, and the overhang of the hot curve at its cold end is the | |
| cold utility. The place where the curves come closest vertically is the pinch, | |
| and by construction they approach no closer than ``T_min_app``. | |
| .. figure:: /_static/images/examples/tutorial_02_composite_curves.png | |
| :class: white-bg | |
| :width: 720 | |
| :alt: Composite curves of the quickstart system: a red hot composite curve above a blue cold composite curve, on axes of temperature in degrees Celsius against enthalpy in GJ/hr, with a shaded band marking the recovered heat, a cold utility bracket labelled 1.94e+06 kJ/hr at the cold end and a hot utility arrow labelled 2.83e+08 kJ/hr at the warm end. | |
| Composite curves of the quickstart system at ``T_min_app = 5`` K. The | |
| shaded band is the heat the two curves can exchange with each other; the | |
| arrows are the two MER targets, a hot utility of 2.828e+08 kJ/hr and a cold | |
| utility of 1.936e+06 kJ/hr. The curves come closest at the cold end, where | |
| the pinch of this system lies -- 298.15 K on the shifted scale. | |
| :doc:`tutorial/02_pinch_analysis` builds this figure from a | |
| :class:`~hensmith.ProblemTable`. | |
| The **grand composite curve** plots the same cascade differently: the heat | |
| carried through each shifted grid temperature once the minimum hot utility is | |
| supplied, against that temperature. It touches zero exactly at the pinch for a | |
| pinched problem; for a threshold problem, where no hot utility is needed, the | |
| curve's minimum may be strictly positive and the pinch is placed at the top of | |
| the grid, ``Ts[0]``, by convention. Its shape shows where in the temperature | |
| range utility has to be added or removed. | |
| Both pictures express the three rules of pinch design: **no heat may cross the | |
| pinch**, **no cold utility may be used above it**, and **no hot utility below | |
| it**. Violating any one of them makes the network use more of both utilities | |
| than the targets require, by the amount transferred across the pinch. | |
| From targets to a network: the pinch-outward MER planner | |
| -------------------------------------------------------- | |
| :func:`~hensmith.synthesize_network` takes the heat utilities of the process, | |
| runs the problem table above, plans a network *without stream splits* that | |
| reaches the MER targets whenever its search finds one (by default; with | |
| ``stream_splitting=True`` it splits streams where MER needs them, see `Stream | |
| splitting`_ below), and realizes the plan | |
| as BioSTEAM exchangers. Streams are numbered in a rearranged order -- heated | |
| streams first, then cooled streams -- and every array, exchanger ID and life | |
| cycle uses that index. The order only breaks ties in the planner's search: the | |
| facility hands the utilities over sorted by signed duty, and | |
| ``sort_hus_by_T`` sorts them by inlet temperature instead. | |
| **The planner's model.** Each stream enters the planner as its knots on the | |
| problem-table grid: its enthalpy at every grid temperature inside its range, | |
| with two knots where its curve has a flat. Every breakpoint of every curve is | |
| a grid point and the table is linear between grid points, so the planner's own | |
| cascade reproduces the table exactly -- the same targets, the same pinch and | |
| the same pinch cut. Each stream is cut at the pinch into an above-pinch part | |
| and a below-pinch part (a stream lying wholly on one side has an empty part on | |
| the other), and the two sides are planned as two independent problems. | |
| **Must and flex streams.** Above the pinch no cold utility may be used, so | |
| every hot stream there is a **must**: process matches have to cool it | |
| completely. The cold streams above the pinch are **flex** streams: whatever | |
| their matches leave over is supplied by one hot utility at their far (hot) | |
| end. Below the pinch the roles swap: no hot utility may be used, so every cold | |
| stream is a must, and the hot streams are flex streams finished by one cooler | |
| at their cold end. Putting a flex stream's utility at its far end loses | |
| nothing: moving a stream's later matches toward its inlet never reduces the | |
| approach of any match on it, because every stream's curve is monotone. | |
| **Building each side from the pinch outward.** A depth-first search builds | |
| each side one match at a time, starting at the pinch, where the driving forces | |
| are smallest, and moving outward. A match of duty :math:`x` between a must and | |
| a flex stream is feasible only if the two streams keep ``T_min_app`` at every | |
| knot along it, so internal pinches -- a condensing vapor against a boiling | |
| mixture, say -- are respected, not just the exchanger's terminals. Every step | |
| also keeps the problem table of the *remaining* problem feasible (remaining | |
| problem analysis): the largest duty that does so has a closed form, so no step | |
| can make MER unreachable by its own table. Wherever that remaining table is | |
| tight -- a pinch of the remaining problem -- the pinch design rules of Linnhoff | |
| and Hindmarsh must hold: | |
| - above the pinch, every hot stream at the pinch needs its own cold stream at | |
| the pinch, with :math:`C_{hot} \le C_{cold}` (the number rule | |
| :math:`N_{hot} \le N_{cold}` and the heat-capacity-flow rule); | |
| - below the pinch, every cold stream at the pinch needs its own hot stream at | |
| the pinch, with :math:`C_{hot} \ge C_{cold}`. | |
| Both rules are generalized to isothermal segments: a flat -- a pure component | |
| boiling or condensing exactly at the pinch -- has unlimited series capacity | |
| and can serve several partners in turn. At the process pinch itself a | |
| violation of these rules *proves* that MER needs stream splitting. | |
| The candidate duties of a match are the largest feasible one and a finite set | |
| of events: a stream is ticked off, a partner is saved for another stream, a | |
| stream switches partner or returns to an earlier one. The search is budgeted | |
| in deterministic work units rather than seconds, so its result does not depend | |
| on the speed of the machine. Once a MER plan is found, a branch and bound on | |
| the number of exchangers looks for a smaller one; consecutive pieces of the | |
| same match are merged into one exchanger. | |
| **Repeated pairs.** The same hot and cold stream may be matched more than | |
| once on the same side: alternating two partners in series emulates a split, | |
| and some unsplit MER networks need it (a real split is optional, see `Stream | |
| splitting`_). Process exchangers are named | |
| ``HX_<cold>_<hot>_hs`` above the pinch (the hot-side design) and | |
| ``HX_<hot>_<cold>_cs`` below it (the cold-side design), the first number being | |
| the stream at port 0; the *n*-th exchanger of the same pair on the same side, | |
| counted in the order the hot stream meets them, gets the suffix ``_<n>`` for | |
| :math:`n \ge 2` (for example ``HX_3_2_cs_2``). Utility exchangers are | |
| ``Util_<index>_hs`` for a cold stream and ``Util_<index>_cs`` for a hot one. | |
| ``avoid_recycle=True`` forbids matching any pair twice anywhere -- on one side | |
| or across the two -- so that no two exchangers connect the same pair of | |
| streams, at the cost of the MER networks that need a repeated pair. | |
| **Best effort when splitting is needed.** By default, a side whose pinch rules | |
| prove that MER needs a split, or whose search runs out of budget, gets a | |
| best-effort plan instead (with ``stream_splitting=True`` it is planned with | |
| splits, see `Stream splitting`_). Heat that a must stream cannot place (a *gap*) is moved to the | |
| stream's pinch end, where it crosses the pinch at the cost of an equal amount | |
| of extra hot and cold utility, the *penalty*; greedy dives and a bisection of | |
| the gaps keep that penalty small, though not minimal in general. Such a | |
| network reports ``'best_effort'``. | |
| **Small matches.** A planned exchanger with a duty below ``Qmin`` (default | |
| ``1e-3`` kJ/hr) is dropped and its duty left to the utilities. Removing a | |
| match never reduces the approach of another, so the rest of the plan stays | |
| feasible; a large ``Qmin`` can, however, cost MER. | |
| **Realization.** Each stream is walked in flow order from its inlet: a hot | |
| stream through its above-pinch matches (from its inlet end), then its | |
| below-pinch matches, then its cooler; a cold stream through its below-pinch | |
| matches, then its above-pinch matches, then its heater. Each match becomes one | |
| plain ``HXprocess`` whose two enthalpy limits, ``H_lim0`` and ``H_lim1``, are | |
| the planned outlet enthalpies of its two streams, so that its duty reproduces | |
| the plan. A planned outlet whose equilibrium state is not past the stream's | |
| state at the exchanger inlet cannot be a limit (``HXprocess`` rejects it): one | |
| strictly inside a non-equilibrium end jump, or a state of a point-load stream | |
| on the wrong side of its inlet. That stream's limit is left out, and the other | |
| stream's sets the duty. A stream's first exchanger receives its real inlet -- | |
| except a point-load stream, which enters at equilibrium at its inlet enthalpy, | |
| on the side of its outlet temperature where the plan put its duty -- and every | |
| later exchanger receives the stream's exact state at the planned enthalpy. | |
| Each exchanger is simulated once; one whose duty differs from the plan is | |
| reported, and one that cannot be simulated at all is dropped, its duty going | |
| to the utilities. Finally one rigorous ``HXutility`` per stream takes it to its outlet | |
| enthalpy, and an ``AssertionError`` is raised if that does not reproduce the | |
| quenched outlet enthalpy and temperature, so a network that would not deliver | |
| the specified outlets fails loudly rather than silently. | |
| **Exact approach verification.** The knots are exact at grid points but are | |
| chords in between, up to 0.002 K off inside glides and curved single-phase | |
| stretches. Every planned exchanger is therefore checked on the exact states of | |
| its two streams wherever its planned approach is within that margin of | |
| ``T_min_app``: at its ends, at every breakpoint inside it and, where the exact | |
| approach is not linear between two positions, by a search for a dip in | |
| between. ``HXprocess`` itself checks only its two terminals, which would miss | |
| an internal pinch at a phase change. Where a MER plan falls short by more than | |
| 1e-6 K, the exact states are inserted as knots and the network is planned | |
| again, for at most three rounds. A best-effort plan, or a MER plan still short | |
| after the last round, instead has each violating match shrunk to the largest | |
| duty that keeps the approach, the rest going to the utilities: with its inlets | |
| fixed, a smaller duty can only raise a match's approach, and the later stages | |
| of both streams move toward their inlets, which never reduces another match's | |
| approach. Streams of constant heat capacity never need either step. | |
| **The report.** ``synthesize_network(..., info={})`` fills the dictionary it is | |
| given, and :class:`~hensmith.HeatExchangerNetwork` keeps it as | |
| ``synthesis_info``. ``'status'`` is ``'mer'`` only if the utilities of the | |
| *realized* network, computed from the simulated exchanger duties, equal the | |
| targets (to 1e-6 of the total stream duty), and ``'best_effort'`` otherwise. | |
| Next to it are the targets (``'Q_hot_target'``, ``'Q_cold_target'``), the | |
| planned and the realized utilities, the ``'penalty'``, per side of the pinch | |
| (``'sides'``) the search method, its work, any proof that a split is needed | |
| and the gaps, the planner's own targets and pinch, the number of refinement | |
| rounds, the smallest approach inside any process exchanger, the matches that | |
| were shrunk (``'repaired'``), dropped (``'qmin_dropped'``, ``'dropped'``) or | |
| deviated from their plan (``'deviations'``), and the point-load streams. With | |
| ``stream_splitting=True`` it also holds the realized splits (``'splits'``), any | |
| mixer whose outlet is off its planned state (``'split_deviations'``) and, per | |
| side, the split candidate chosen (``'split'``). The full list is under the | |
| ``info`` keyword of :func:`~hensmith.synthesize_network`. | |
| Stream splitting | |
| ---------------- | |
| By default hensmith does not split streams, so a side of the pinch whose | |
| pinch design rules prove that MER needs a split gets a best-effort network. | |
| ``HeatExchangerNetwork(..., stream_splitting=True)`` (or | |
| ``synthesize_network(..., stream_splitting=True, info={})``) lets the planner | |
| split a process stream into parallel branches that re-join. Only a side that | |
| no unsplit network serves at MER -- one with a pinch-rule proof, or whose | |
| unsplit search leaves a utility penalty -- is planned with splits; a side that | |
| an unsplit network serves is planned exactly as without the option, so a | |
| problem that needs no split gets the same network either way. | |
| **Branches.** A branch of flow fraction :math:`f` carries the parent stream's | |
| material at the parent's pressure, so at branch heat :math:`q` it is in the | |
| parent's state at heat :math:`q/f`: its temperature-enthalpy curve is the | |
| parent's with every heat times :math:`f`, and its heat capacity flow rate is | |
| :math:`f` times the parent's. Splitting a stream into branches whose fractions | |
| sum to one leaves the problem table unchanged, so a split never changes the | |
| targets; it changes only what the pinch design rules count (one stream per | |
| branch, each with :math:`f\,C`) and the approach inside each exchanger. The | |
| planner builds a split side from a portfolio of candidates -- splits at the | |
| pinch that repair the number and heat-capacity-flow rules, completed by the | |
| ordinary search, and a *vertical* construction that matches every stream's | |
| branches at the same position of the composite curves -- verifies every | |
| exchanger at every knot of both branch curves, and keeps the best candidate | |
| by a key that first avoids tiny exchangers or branches and re-joins at | |
| different temperatures ahead of another exchanger, then counts exchangers, | |
| extra branches and split stages. The theory (the lemmas, the constructions | |
| and their proofs) is in the module docstring of ``hensmith._splitting``. | |
| **Realization.** Each split becomes a chain of BioSTEAM ``Splitter`` units, | |
| one fewer than its branches (IDs ``Split_<stream>_<hs|cs>``, with ``_<n>`` for | |
| a stream's *n*-th split on that side and ``_b<c>`` for the chain's element | |
| :math:`c \ge 2`), and a rigorous, adiabatic ``Mixer`` (``Mix_<stream>_<hs|cs>``) | |
| where the branches re-join; neither is costed. A branch exchanger runs its | |
| fraction of the flow in the parent's states, with an enthalpy limit | |
| :math:`f` times the parent's, and every mixer starts at its planned state. The | |
| facility lists them in ``new_splitters`` and ``new_mixers`` and simulates them | |
| in ``HXN_sys`` with the exchangers; ``synthesis_info['splits']`` describes | |
| every split (:class:`~hensmith.hxn_synthesis.StreamSplit`), and a split | |
| stream's life cycle marks each branch stage with its branch and fraction. | |
| **The guarantee and its limits.** Without ``avoid_recycle``, every side that | |
| needs a split gets a split plan at MER on the planner's knots: the vertical | |
| construction always succeeds (up to a deficit of about 1e-9 of the total duty | |
| that the problem table's own tolerances already absorbed into the targets). | |
| With constant heat capacities the knots are exact and the realized network | |
| reaches the targets to round-off. With real thermodynamics the knots are | |
| chords of the exact curves, so a split exchanger can fall short of | |
| ``T_min_app`` on the exact states by up to the chords' tolerance; the same | |
| refinement rounds as for unsplit networks close that, plus up to two rounds | |
| that try another candidate, and only an exchanger still short after them is | |
| shrunk (``'repaired'``, status ``'best_effort'``). With ``avoid_recycle``, a | |
| split that would repeat a stream pair is not used, and MER is then not | |
| guaranteed. The number of exchangers is minimized only among the candidates a | |
| side generates, not globally. The test suite reaches ``'mer'`` with splits on | |
| all 38 split-needing problems of its corpus and on the three regression | |
| systems that need splits, each checked on its actual stream graph: splitters, | |
| mixers at equilibrium, balances and the exact approach inside every exchanger. | |
| :doc:`tutorial/04_configuring` shows an example. | |
| Rigor and phase change | |
| ---------------------- | |
| Process streams in a biorefinery boil, condense and change composition, so | |
| hensmith never assumes a constant heat capacity. Every enthalpy it uses comes | |
| from thermosteam: | |
| - **Quenched outlets.** Before any analysis, each stream's outlet copy is | |
| re-flashed at its own enthalpy (``s.vle(H=s.H, P=s.P)``). An upstream | |
| ``HXutility`` that was not solved rigorously can leave an outlet in a | |
| non-equilibrium state; quenching puts that heat at the temperature the | |
| equilibrium model says it is available at. | |
| - **Curves instead of flashes on the grid.** Flashing every stream at every | |
| grid temperature has three defects that the stream curves avoid. A phase | |
| boundary or a curvature inside a grid interval is averaged away (see *The | |
| shifted grid* above). A ``vle(T=T_sat)`` of a single chemical keeps | |
| whatever phase split the stream had, so the enthalpy exactly at a | |
| saturation temperature depends on history; the curve takes a pure | |
| component's latent heat as a flat between V-specified saturated states and | |
| evaluates single-phase stretches with their phases fixed, so a grid point | |
| on a saturation temperature is never ambiguous. And thermosteam's | |
| two-phase flashes of some mixtures (water and ethanol with 20-50 % ethanol, | |
| for instance) silently return non-converged states; the curve traces a | |
| binary glide along its bubble-point curve and sanity-checks the flashes of | |
| other mixtures. | |
| - **Point loads.** A pure component's latent heat contributes at its | |
| saturation temperature as a point load, and so does the whole duty of an | |
| isothermal or non-monotone stream at its outlet temperature, instead of | |
| being smeared over an interval; that is what keeps the cascade -- and the | |
| pinch it locates -- correct for latent duties. | |
| - **Pinch states.** ``pinch_state`` returns the state of a stream at a pinch | |
| temperature from its curve, deterministically: a pinch on the stream's own | |
| saturation temperature is resolved by the side of the pinch cut, never by | |
| whatever phase split a previous flash left, and the enthalpy is clipped to | |
| the stream's real range, so the state never carries heat the real stream | |
| does not have. It is a standalone analysis helper; the synthesis plans on | |
| the curves themselves. | |
| - **Rigorous exchangers.** Every synthesized process exchanger is an | |
| ``HXprocess`` simulated from exact inlet states with both enthalpy limits | |
| at its planned outlets and its approach verified on exact states, and every | |
| synthesized utility exchanger is an ``HXutility`` with ``rigorous=True``, | |
| specified by enthalpy rather than by temperature. | |
| The network as a BioSTEAM system | |
| -------------------------------- | |
| :class:`~hensmith.HeatExchangerNetwork` is a BioSTEAM ``Facility``. Its | |
| ``_run`` and ``_design`` do nothing; all of the work happens in ``_cost``, | |
| which runs only after every process unit of the system has converged, so the | |
| duties it integrates are final ones. | |
| **A separate flowsheet.** The synthesis happens inside a temporary flowsheet | |
| named ``<sys>_HXN``, where ``<sys>`` is the system's ID. The original streams, | |
| exchangers and units are never modified (unless ``replace_unit_heat_utilities`` | |
| is set, described below): the network is built from copies, and | |
| those copies and the new exchangers are what you inspect afterwards through | |
| ``new_HXs``, ``new_HX_utils`` and the ``stream_life_cycles`` | |
| (:class:`~hensmith.StreamLifeCycle`) that | |
| :func:`~hensmith.plot_pinch_diagram` draws. | |
| **Which streams take part.** The facility collects the heat utilities of its | |
| ``units`` (all units of the system unless a list or a callable is given), | |
| drops any utility flagged as not usable for HXN integration | |
| (``hxn_ok=False``, set by some unit operations) or with non-positive flow, | |
| anything listed in ``ignored``, and anything with zero duty, and sorts what is | |
| left by duty. Auxiliary exchangers -- a column's condenser and reboiler, a | |
| flash's feed heater -- are included like any other. | |
| **Convergence.** After synthesis each stream's stages are rewired in series | |
| (the branches of a split in parallel, from its splitter chain to its mixer), | |
| and the new units are assembled into a ``System``, ``HXN_sys``, whose path | |
| follows the streams: every stage links to the next stage of the same stream, | |
| and the path is a topological order of that graph (Kahn's algorithm, | |
| ties broken by the order of the exchangers). Where the graph has a cycle -- | |
| a pair of streams matched both above and below the pinch, or repeated matches | |
| in alternating order -- the unit with the fewest unplaced predecessors comes | |
| next and its inlets from later units become recycle streams. Every exchanger | |
| starts at its planned state, so the loops are at their fixed point after one | |
| pass; the system is converged by fixed-point iteration to tight tolerances | |
| (a temperature change of 1e-8 K), which closes the energy balance to about | |
| 1e-10 %. Should convergence raise, every unit is run once and a | |
| ``RuntimeWarning`` is issued. | |
| **Streams served by process exchange alone.** A stream that its process | |
| exchangers bring to its outlet (to within 1e-9 of its duty, the residual of | |
| the enthalpy flashes) leaves its utility exchanger in exactly the state it | |
| enters it, so that exchanger has no duty and no cost -- rather than a spurious | |
| duty of a few 1e-9 kJ/hr from re-flashing the stream, which biosteam would | |
| design and cost as a minimum-size exchanger. | |
| **Where it sits among the facilities.** ``network_priority = -2`` is lower | |
| than that of any other standard BioSTEAM facility, and facilities are | |
| simulated in increasing order of priority, so the network is integrated before | |
| the chilled water package, cooling tower and boiler are sized: they see the | |
| loads it has already reduced. | |
| **Costs and utilities are differences.** The facility's capital is the *added* | |
| exchanger cost, ``max(0, new - original)`` for both installed and purchase | |
| costs, so a network whose exchangers happen to be cheaper than the ones it | |
| replaces is reported as adding nothing rather than as a credit. Its heat | |
| utilities are the new utilities summed by agent with the *reversed* original | |
| ones -- new minus original -- so a negative utility cost on the facility is a | |
| saving. Setting ``replace_unit_heat_utilities=True`` instead overwrites each | |
| original unit's heat utility with that of its own stream's utility exchanger, | |
| reloads the utility costs of the unit and of its owner, and leaves the | |
| facility itself carrying none; the original data are given back before the | |
| network is costed again, so the next network is synthesized from the units' | |
| own utilities. If no process match was made at all, the facility reports zero | |
| capital and no utilities. | |
| **Reusing a network.** With ``cache_network=True`` a later simulation checks | |
| whether the set of units behind the heat utilities is unchanged; if it is, the | |
| same network configuration is reused instead of being synthesized again. Each | |
| life cycle's first inlet is copied from the current stream, and each process | |
| exchanger keeps, as the enthalpy limit of its *must* stream (the hot stream | |
| above the pinch, the cold stream below it), the fraction of that stream's | |
| duty at which its limit sat at synthesis, so a changed feed rescales every | |
| stage instead of letting the first one take the whole duty. Its partner, the | |
| flex stream, transfers what that sets, but never past its own outlet, and | |
| takes the rest to its utility exchanger; a port that had no limit at | |
| synthesis gets none. The utility exchangers bring every stream to its new | |
| outlet enthalpy. A reused network is not planned again, so it need not be at | |
| MER for the new duties, and ``synthesis_info`` still describes the synthesis | |
| that produced it. If the reused network then fails its outlet checks, | |
| hensmith warns, discards the cache and re-synthesizes from scratch. If it fails | |
| its energy balance instead, the cache is discarded and the network | |
| re-synthesized silently; a warning is issued only if the freshly synthesized | |
| network fails the same check. | |
| Validation | |
| ---------- | |
| hensmith checks every network it synthesizes, and its test suite checks the | |
| synthesizer against independent references. | |
| **The energy balance.** After convergence, every process exchanger duty is | |
| counted twice -- it satisfies a cooling demand and a heating demand at once -- | |
| and added to the new utility duties, and the total is compared with the | |
| original utility duties, each utility weighted by its agent's heat transfer | |
| efficiency: | |
| .. math:: | |
| Q_{bal} = \frac{2 \sum_p |Q_p| + \sum_u |q_u \eta_u|} | |
| {\sum_o |q_o \eta_o|}. | |
| ``energy_balance_percent_error`` is :math:`100 (Q_{bal} - 1)`, reported for | |
| diagnostics. The check itself compares the underlying fraction: when | |
| :math:`|Q_{bal} - 1|` exceeds ``acceptable_energy_balance_error`` (a class | |
| attribute, ``0.02``, i.e. 2%, overridable per instance), hensmith warns -- or | |
| raises, if ``raise_energy_balance_error`` is set. A cached network that fails | |
| this check is instead discarded and re-synthesized, as described above. A | |
| converged network closes this balance to numerical precision. | |
| **Outlet reproduction.** Each stream's life cycle must end in the same state | |
| as the original exchanger's outlet: composition, pressure and enthalpy are | |
| asserted stream by stream. The utility exchangers created during synthesis are | |
| checked the same way, against the quenched outlet enthalpy and temperature. | |
| **The approach inside every exchanger.** The synthesis verifies every process | |
| exchanger on the exact states of its streams (see *Exact approach | |
| verification* above) and records the smallest approach it found in | |
| ``synthesis_info['min_approach']``; the tests re-check it with temperatures | |
| computed independently of the code under test. | |
| **MER identification and achievement.** ``tests/test_hxn_mer.py`` synthesizes | |
| a corpus of 78 problems through the public facility. For 40 of them -- 24 | |
| constant heat capacity problems from the literature and 16 | |
| real-thermodynamics problems with condensers and boilers at the pinch, | |
| desuperheating and subcooling, and binary glides; 11 with more than ten | |
| streams -- an unsplit MER network exists, proven inside the suite by a | |
| certificate network that is re-checked there (by plain arithmetic for | |
| constant heat capacity); the synthesized network must reach the targets and | |
| report ``'mer'``. For the other 38 (25 from the literature and 13 with real | |
| thermodynamics; 13 with more than ten streams) the pinch design rules prove | |
| that MER needs stream splitting, a proof re-derived in the test module; by | |
| default the network must never beat the targets and must report | |
| ``'best_effort'``, and with ``stream_splitting=True`` it must reach them and | |
| report ``'mer'``, checked on its actual stream graph (splitters, mixers at | |
| equilibrium, every stream's closure). The 40 problems of the first set must | |
| also plan exactly as without the option (18 of them are synthesized both | |
| ways, and must give the same network). In both sets the | |
| targets must equal an independent | |
| reference -- a closed-form constant heat capacity cascade and the published | |
| values, or a dense-grid calculator for real thermodynamics -- and every | |
| material and energy balance and the exact internal approach of every | |
| exchanger are checked. | |
| **Regression cases.** ``tests/test_hxn_regression.py`` builds ten synthetic | |
| systems of increasing complexity -- all with phase-changing streams from the | |
| third on -- and for each one requires that the synthesized network (i) closes | |
| its energy balance without raising ``RuntimeWarning``, (ii) never uses less | |
| hot or cold utility than the MER targets computed on the same streams, and | |
| reports ``'mer'`` exactly when it reaches them, (iii) keeps ``T_min_app`` | |
| inside every process exchanger on exact states, (iv) is planned on the | |
| problem table's own cascade, and (v) recovers at least as much heat as a load | |
| recorded in the test file. A network that improves leaves slack in (v); those | |
| recorded numbers are lowered deliberately by a maintainer, never raised to | |
| make a failing test pass. Every case is synthesized again with | |
| ``stream_splitting=True`` and held to the same checks, and the three cases | |
| that need stream splits for MER must then reach their targets. | |
| **Doctests.** The examples in the docstrings are executed as part of the test | |
| suite, so the numbers printed in the API reference are numbers the code | |
| currently produces. | |
| Guarantees and limitations | |
| -------------------------- | |
| What the synthesized network is guaranteed to be: | |
| - **Never better than MER.** Its utilities are never below the targets of the | |
| problem table, and ``'mer'`` is reported only if the realized network | |
| reaches them. | |
| - **Feasible everywhere inside.** Every process exchanger keeps | |
| ``T_min_app - 1e-6`` K on the exact stream states at its ends and at every | |
| checked position inside it, and the heat balance closes on every stream. | |
| - **Deterministic.** The search is budgeted in work units, not seconds, so | |
| the same streams give the same network however fast the machine is. | |
| What it is not: | |
| - **MER is reached whenever the planner finds an unsplit network -- which is | |
| an empirical, not a proven, property.** Every pruning test of the search is | |
| a necessary condition, so a missed MER network can only come from the | |
| finite set of candidate duties, the caps on repeated pairs or the work | |
| budgets. The planner reached MER on every problem of a certified benchmark | |
| of about 1,700 problems with 2 to 40 streams for which an unsplit MER | |
| network exists, and it does so on all 40 no-split problems of the test | |
| suite, but no proof covers every problem. | |
| - **By default, streams are not split.** Every stream stays a single branch | |
| through the network. Where the pinch design rules prove that MER needs a | |
| split, the network is a best-effort one whose penalty is small but not | |
| minimal in general; repeated matches between the same two streams, | |
| alternating in series, can approach a split only in the limit. With | |
| ``stream_splitting=True`` such a side is split and reaches MER, within the | |
| limits given under `Stream splitting`_: exact on constant heat capacity | |
| streams, closed by refinement on real thermodynamics, not guaranteed with | |
| ``avoid_recycle``, and with the number of exchangers minimized only among | |
| the candidates the planner generates. | |
| - **Energy first, then units; no cost optimization.** MER always takes | |
| precedence over the number of exchangers, and an unsplit MER network can | |
| need many of them. The branch and bound reduces the number of exchangers | |
| among MER plans, but nothing optimizes area, capital or total cost. | |
| - **Some networks cannot be represented.** Networks whose match order is | |
| cyclic are outside the planner's model. A side that needs a split without a | |
| pinch-rule proof spends its whole MER search budget before the best-effort | |
| step (or the split attempt), which costs time rather than quality. | |
| - **Flash failures inside some glides.** Thermosteam's TP flashes fail | |
| silently inside the glides of some mixtures (water and ethanol with 20-50 % | |
| ethanol, for instance); an exchanger simulated there can deviate from its | |
| plan, and is then reported in ``synthesis_info['deviations']`` (a split's | |
| mixer, in ``synthesis_info['split_deviations']``). | |
| - **Only streams behind existing utility exchangers are integrated.** The | |
| facility sees a process stream only through a heat utility attached to a | |
| unit of the system. A duty carried some other way is invisible to it; | |
| utilities flagged as not usable for HXN integration (``hxn_ok=False``) or | |
| with non-positive flow, and streams excluded with ``ignored``, are removed | |
| from the analysis entirely. | |
| - **One approach temperature for everything.** A single ``T_min_app`` shifts | |
| the problem table and constrains every synthesized exchanger. There is no | |
| per-stream or per-match approach temperature, so a match whose exchange is | |
| cheap and one whose exchange is expensive are held to the same driving-force | |
| floor. | |
| References | |
| ---------- | |
| - Linnhoff, B., & Hindmarsh, E. (1983). The pinch design method for heat | |
| exchanger networks. *Chemical Engineering Science*, 38(5), 745-763. | |
| - Smith, R. (2005). *Chemical Process Design and Integration*. Wiley. | |
| - Kemp, I. C. (2007). *Pinch Analysis and Process Integration: A User Guide on | |
| Process Integration for the Efficient Use of Energy* (2nd ed.). | |
| Butterworth-Heinemann. | |
| - Seider, W. D., Lewin, D. R., Seader, J. D., Widagdo, S., Gani, R., & Ng, | |
| M. K. (2017). *Product and Process Design Principles*. Wiley. Heat Exchanger | |
| Networks (Chapter 9). | |
| - Cortes-Pena, Y., Kumar, D., Singh, V., & Guest, J. S. (2020). BioSTEAM: A | |
| fast and flexible platform for the design, simulation, and techno-economic | |
| analysis of biorefineries under uncertainty. *ACS Sustainable Chemistry & | |
| Engineering*, 8(8), 3302-3310. https://doi.org/10.1021/acssuschemeng.9b07040 | |
| .. seealso:: | |
| :doc:`tutorial/02_pinch_analysis` applies the problem table to a real | |
| system; :doc:`tutorial/03_network_anatomy` walks through a synthesized | |
| network exchanger by exchanger; :doc:`API/api` documents every public name. | |