uid large_stringlengths 32 32 | url large_stringlengths 21 533 | domain large_stringlengths 5 168 | keyword_score float64 -1 23.5 | pos_keys large_stringlengths 0 113 | neg_keys large_stringclasses 174
values | pred_proba float64 0.8 1 | image_width int64 400 16.7k | image_height int64 400 13k | image_max_dim int64 400 16.7k | image_format large_stringclasses 4
values | image_size_bytes int64 6.57k 20.7M | sha256 large_stringlengths 64 64 | phash large_stringlengths 16 16 | retrieved_at large_stringdate 2026-08-01 11:19:14 2026-08-01 15:26:18 | short_description large_stringlengths 122 557 | has_text bool 2
classes | method_choropleth bool 2
classes | method_diagrams bool 2
classes | method_dot_density bool 2
classes | method_isolines bool 2
classes | method_cartogram bool 2
classes | method_flow_map bool 2
classes | method_heat_map bool 2
classes | methods_count int64 1 5 | legend_is_classed bool 2
classes | classification_confidence large_stringclasses 3
values | is_duplicate_byte bool 2
classes | duplicate_group_id large_stringclasses 836
values | annotated_at large_stringdate 2026-08-01 15:43:22 2026-08-02 09:55:11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
cf5b4437f6807f8639460a3198875fa5 | the2states.com | 0.5 | data | 0.926703 | 720 | 618 | 720 | JPEG | 52,321 | c49be7dd83df92621309f3406c039859e49f7c3946c1cdae7ac8a75a082a3df3 | b9c885b66e4b4b92 | 2026-08-01T13:45:18.265756 | Choropleth map of India showing contacts tested per confirmed COVID-19 case by state and union territory from January 22 to April 3, with a three-category legend indicating testing percentile ranges and numeric values labelled within each region. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T23:26:35.190938 | ||
cf62960be0c1c54a476e6eb9d8c3ee45 | http://cdn3.chartsbin.com/chartimages/l_24259_1b116fa6b8875a08194ebfcdd7461797 | cdn3.chartsbin.com | 1 | change | 0.984382 | 940 | 469 | 940 | PNG | 147,190 | 34f1a80aa2d5a57666e78241c14f5ba357a88a60c9b7bb8c6a7e1ce2d30f36f6 | ec6f899091c3673c | 2026-08-01T13:17:23.213452 | World choropleth map showing the percentage of people in each country who believe humans are causing climate change, with a colour gradient legend ranging from 10–25% (dark blue) to 75–90% (dark green). | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T21:33:08.059961 | |
cf6494caa5d7310825e91de43271695b | cdn.infodiagram.com | 0.5 | chart | 0.831567 | 800 | 600 | 800 | WEBP | 48,788 | 3c337e37a9f8171ee364be23a95d53b74c7f7e7638eb8b506307b0c75ac3bb7b | ca92b66cb7a52926 | 2026-08-01T14:13:52.193071 | Choropleth map of the Southeastern European region showing government net debt in 2017, with countries shaded in blue, green, orange, and purple according to numeric values displayed both on the map and in a bar chart legend on the left. | true | true | true | false | false | false | false | false | 2 | null | high | false | null | 2026-08-02T01:21:13.857506 | ||
cf662e91033a62e12401b0f742fe83e4 | learn.uat.edu | 0 | 0.974988 | 1,338 | 980 | 1,338 | PNG | 335,179 | 022aacddc40e17fdaffd22a51c1dfbc7926d4ec06e2ae373ab5073fc2d559c41 | e129989cc6666b5b | 2026-08-01T13:37:40.093294 | Choropleth map of the United States showing cybersecurity job openings by state, with a sequential blue colour gradient legend. The map is the dominant element of a dashboard-style layout that also includes national-level statistics and supplementary charts below. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T22:54:27.344823 | |||
cf6a258ef19409ec227171dc2431309d | bits.media | 1 | статистика | 0.965103 | 1,104 | 709 | 1,104 | PNG | 248,090 | 320d78732061c45df7cb2967da04ddd36c99fe7d9667e186f1e641fb0dc70259 | e639cdc626193966 | 2026-08-01T14:06:49.435353 | Choropleth map of the world showing SAFT (Specified Activities Funding Tier) fundraising amounts by country of legal residence, measured in million dollars, with a sequential colour gradient from light yellow to dark red. | true | true | false | false | false | false | false | false | 1 | true | medium | false | null | 2026-08-02T00:52:37.848120 | ||
cf6d5af1b817549d49f683ceca904ac5 | citizenstakeaction.org | 1 | vote | 0.881548 | 800 | 598 | 800 | PNG | 139,057 | 91f9cff17703b54bd92a2dbce6c7eec592ac993d678489ede341ebfae725b314 | bf9ec16942321e87 | 2026-08-01T12:55:01.063588 | A choropleth map of the United States showing the results of the 2016 presidential election, with states coloured blue (Clinton, 232 electoral votes) or red (Trump, 306 electoral votes) and electoral vote counts labelled within each state. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-01T19:50:29.607474 | ||
cf6f16ea2332fbd3e55207fbf4e26e22 | gray-wndu-prod.cdn.arcpublishing.com | 2 | deaths|state | 0.852974 | 800 | 450 | 800 | JPEG | 42,990 | 325aa1728af3a9c1cc4f499e8ef0efa8d8582837cb0af74c3cec41879e5c552a | bbc1c1369533e03d | 2026-08-01T13:27:27.905826 | Choropleth map of the United States showing COVID-19 case density by county, with a sequential blue colour gradient from light to dark. Aggregated statistics for total confirmed cases, deaths, and daily figures are displayed to the right of the map. | true | true | false | false | false | false | false | false | 1 | true | medium | false | null | 2026-08-01T22:14:31.618334 | ||
cf7419afc1a1a63a632da83415c472ea | http://planetsave.com/wp-content/uploads/2014/09/are-electric-cars-greener-map.jpg | planetsave.com | 0 | 0.932487 | 2,020 | 2,562 | 2,562 | JPEG | 1,632,838 | a4821d9b156ba38d7b02177be2146b07dfe3defcc98cbab766c8f6b5c66f606e | bf273694968368e8 | 2026-08-01T12:55:52.658769 | Choropleth map of the United States showing regional electricity grid codes with associated MPG (miles per gallon equivalent) values for electric vehicles by region, using a two-tone blue colour scheme. The map is accompanied by explanatory legends and text below describing how global warming emissions of electric vehi... | true | true | false | false | false | false | false | false | 1 | true | high | true | a4821d9b156ba38d | 2026-08-01T19:54:46.298534 | ||
cf744e80363654753a9178e954815ef9 | http://static.dasfilter.com/images/2014/5/8/explorable-inequality-l.jpg | static.dasfilter.com | 3 | inequality | 0.99543 | 1,280 | 720 | 1,280 | JPEG | 68,350 | f1bd92bb7fb29d122bfa65896ee4585170356ccc1a6b6e140a5ddc74490b6b81 | 9c80e0fefbc30ce1 | 2026-08-01T13:39:43.257305 | World map showing countries colored in a gradient from dark red to light red/salmon, with geographic labels and country names in English. The map appears to represent a global statistical distribution across countries and regions. | true | true | false | false | false | false | false | false | 1 | true | medium | false | null | 2026-08-01T23:02:54.775118 | |
cf74e59ec2868295654d401376728e99 | http://drexel.edu/~/media/Images/now/v2/story-images/2017/February/Stroke%20risk%20factor%20maps%20front.ashx?h=530&la=en&w=800&hash=E56B462ABF1AB2682CC6C4A282B3401F1FA3606F | drexel.edu | 2 | smoking|rates | 0.986635 | 800 | 530 | 800 | JPEG | 240,075 | 6d559f93a8ae2eda55de307d61004634f82abf3ec58211c20b668c70a965a5c5 | ac079383f4c7d178 | 2026-08-01T12:43:57.551057 | Six choropleth maps of the United States showing prevalence (%) of hypertension, diabetes, and smoking in whites and blacks separately, displayed with a diverging colour legend ranging from blue (low) to red (high). | true | false | false | false | false | false | false | true | 1 | true | medium | true | 6d559f93a8ae2eda | 2026-08-01T19:00:21.114796 | |
cf756ec8378daaa96450abf6251650d5 | lvrealestatelady.files.wordpress.com | 0 | 0.940515 | 843 | 763 | 843 | JPEG | 131,086 | 4aca3d5d30ac23e61fb95ea6be813f841cc88ebb08b55982083f72710a8fdabd | b53f9a435728a274 | 2026-08-01T13:44:45.043780 | Choropleth map of the Las Vegas area showing percent change in home values by zip code from 2011 to 2012, with each zip code zone labeled with its corresponding percentage value. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-01T23:24:35.043405 | |||
cf78501ab7133d54599a8ea939f1871f | indigoag.com | 0.5 | chart | 0.939502 | 1,275 | 895 | 1,275 | JPEG | 134,803 | a7a90ca2c5c8d2df9cca5b97eb54f975568c66c6baefe4f3f2361bc9d39e8160 | ea4a9135e5b99887 | 2026-08-01T13:17:42.810201 | Choropleth map of the continental United States showing average cover crop adoption rates by county for 2017–2019, with a six-tier colour legend ranging from less than 1% to 20–100% adoption. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T21:34:18.286645 | ||
cf7c625c96c2e5d4edd920ef7ec88640 | phoebetaylor55.files.wordpress.com | 0 | 0.99635 | 703 | 428 | 703 | JPEG | 55,842 | 882c1a3a1e88f447d26ace608ae6827a3cfe7779f9b3725ddce465a206851194 | e82c93d387cab43c | 2026-08-01T12:24:52.903628 | World choropleth map showing the share of population using the internet in 2015 (%), with a graduated colour legend ranging from light pink (0–19%) to dark red (80–95%), and inset detail maps of selected regions. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T17:25:14.867462 | |||
cf7f1281fe2fe431dd7acad7468ec3c6 | nass.usda.gov | 1 | service | 0.953055 | 738 | 570 | 738 | PNG | 242,670 | fc1f7e54675ffec7f01ff552b9e949e28ba010bf92920fc38b5f5ae0f1dd930f | e6369b8d6846b09b | 2026-08-01T13:41:52.583509 | Choropleth map of soybean production by county across selected U.S. states in 2025, with a graduated green colour legend showing production volumes in bushels from 'Not Estimated' to '8,000,000'. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T23:12:09.608984 | ||
cf86cbfde764f79b1cef347a82011408 | http://mai68.org/spip/IMG/jpg/Police_carte-presence.jpg | mai68.org | 0 | 0.993338 | 960 | 960 | 960 | JPEG | 186,047 | d604f129742d7d1689ee3ab73a32155bd64a7e5511c0aebea39f716a13afd7b6 | e7648e2c941ef135 | 2026-08-01T12:42:40.487361 | Choropleth map of Europe showing police officer density per 100,000 people by country, with a sequential colour legend ranging from dark green (100–200) to dark red (700+) and numeric values labelled on each country. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T18:54:15.589597 | ||
cf8843022140de3eb9f6905a859c65dd | blog.monex.com.mx | 0 | 0.999992 | 900 | 589 | 900 | JPEG | 118,758 | 8cd2e7fd4c841b4861bd453a47cb617c50ead6a0e825cfb727993019ae8addf6 | ae2f9190b1676c6c | 2026-08-01T14:00:58.865719 | World map showing countries coloured by a four-tier categorical scale (red, orange, yellow, green) representing values ranging from >500 to 0–10, with a ranked horizontal bar chart on the left listing countries by the same metric. Data is dated 31 July 2015 and sourced from Mapping Worlds and Bloomberg. | true | true | false | false | false | false | false | false | 1 | true | high | true | 8cd2e7fd4c841b48 | 2026-08-02T00:28:39.415413 | |||
cf8a48ba46a8e16de7a63e566a61e6a2 | mobileapps.com | -1 | guide | 0.914393 | 824 | 454 | 824 | PNG | 210,419 | f427b463df22e089ff045e7c4f559d5df977d1f6f5e5fc0f4fbb0b622e4ffff5 | ee36a9b656c98905 | 2026-08-01T14:22:48.634706 | World map showing salary ranges for software developer roles across multiple countries and regions, color-coded by application complexity level (Simple, Complex, Advanced). Each country/region has an associated legend box displaying three salary tiers. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T01:54:33.890746 | ||
cf8a9c0ea672154bd3c5fe4faa6f8e83 | president.ismcdn.jp | 0 | 0.902115 | 670 | 477 | 670 | JPEG | 28,372 | 2e983d17225cabf662637edf2d4342f8d8cf7e729fbea2594dd37a83799fc6fd | a79e3d141e271663 | 2026-08-01T14:14:02.646129 | World map showing the spread of coronavirus as of May 25, 1900 GMT, with proportional circles representing death counts by location and a legend indicating deaths ranging from 1 to 98,000. A summary box displays global totals of 344,107 deaths and 5,453,656 cases. | true | false | true | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T01:21:40.853318 | |||
cf8b2e24627af3a3ce3f832f6818e8a4 | organic.cdn.usconcealedcarry.com | 1 | rates | 0.940478 | 532 | 426 | 532 | JPEG | 66,312 | 9d8522feb7b08910d7c9fae6ce7c91cf5f0729ba4d4b05085102029c0662ac53 | be0f99e0678d1227 | 2026-08-01T13:03:27.852133 | Choropleth world map showing murders from mass public shootings per 100,000 population (1998–2015), with countries colored by rate category from light yellow (< 0.06) to dark grey/black (> 1.0), and grey indicating no data. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T20:31:01.755905 | ||
cf8fbae9ee3be2d6ff071e721c0f8582 | http://navajosquare.com/images/C327AB55-77CE-424D-9906-715800AB2859.jpeg | navajosquare.com | 3 | deaths|covid|covid-19 | 0.860929 | 749 | 403 | 749 | JPEG | 29,734 | 578f8785aac613eb1055d6c90323334b40fffb4037164f81c715f7099bfde018 | b05bcb6c4e32314f | 2026-08-01T13:51:03.894306 | Choropleth map of the Navajo Nation showing service area rates per 10,000 population by region, with labeled jurisdictions and a graduated color legend ranging from 1,527.6 to 2,417.9. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-01T23:47:55.219622 | |
cf91d7ce1fe9f9fab84a45aed4227347 | rationalnumbers.ru | 0 | 0.962669 | 1,280 | 903 | 1,280 | JPEG | 102,578 | f1285fa84eb94d8eff8cd9539709b0fbc8a143c31b6f0b95a704eacb2956b2f5 | ef25d09093156f6c | 2026-08-01T14:45:38.353302 | Choropleth map of the world showing the share of respondents who disagree that vaccines are safe in 2018, with countries shaded from light yellow (0–5%) to dark blue (>30%) according to a sequential colour legend. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T03:14:51.805252 | |||
cf95effcbba4abc19cd5b3bed8627f8b | elcandelerotecnologico.files.wordpress.com | 0 | 0.898472 | 558 | 437 | 558 | JPEG | 24,072 | 4a1b7b3a93abf573963eced83ffed1fe3e991ef0127d40a0a01b0a76f2da89f0 | f83d9192c64e4e4b | 2026-08-01T12:42:37.426674 | World map highlighting specific countries in red and orange, labelled with percentage values ranging from 2.9% to 29.1%, with a gradient legend at the bottom. The map includes a Kaspersky logo. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-01T18:53:56.759493 | |||
cf99d69e9a171312e16f3bdaef775643 | csgmidwest.org | 4 | percentage|states | 0.94564 | 904 | 1,108 | 1,108 | PNG | 97,418 | a4f417376f5d5423ded9da065c9c4108cca02951c75b6e5285975ebca90b3edf | ba33c4dd42e22d4d | 2026-08-01T14:22:37.000171 | Choropleth map of the Midwest United States showing the share of adults with any mental illness by state for 2017–18, with states colored in dark blue (above national average of 19.0%) or teal (below national average). | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T01:53:45.360482 | ||
cf9ec18cbffd3ebf1bfff57715825408 | s-trojmiasto.pl | 2 | tax|index | 0.928907 | 620 | 598 | 620 | WEBP | 32,486 | 2b12e58ac837ffe2f6468a6aa3b85be6119ecf0e8c23c096bf77cb9922f011fb | bfa3c93c308738f0 | 2026-08-01T11:25:04.874775 | Choropleth map of European OECD countries coloured by their 2020 International Tax Competitiveness Index rankings, with each country labelled by rank number and a diverging colour legend indicating better (green) to worse (red) performance. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T16:17:07.379099 | ||
cfa2b999f0dfe6205d6aef5dbcab2dc9 | electrodes.files.wordpress.com | 6 | pourcentage|recensement | 0.909509 | 610 | 416 | 610 | JPEG | 169,305 | ce2e1a4d9b196e47139280e1c5a6d605e2f43df063a7c72bb3c46b136e2e824c | eb7a94654a08b7a5 | 2026-08-01T12:16:59.630715 | Choropleth map of Ukraine showing the percentage of population identifying Russian as their native language (2001 census), with regions shaded in a gradient from light orange (10%) to dark blue (50%). A small locator globe inset appears in the bottom-left corner. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T16:49:21.468068 | ||
cfa587a680d43ca66bf836d409cc7770 | cdn.teachertube.com | 1 | obesity | 0.962858 | 500 | 500 | 500 | PNG | 298,758 | 3b613e33291a85b2527b38f6a29cae9e571a911586aab6c8ec5a28e68788fa7f | a5a19cbd988afa38 | 2026-08-01T14:27:50.015856 | Choropleth map of the United States showing obesity prevalence across states, with a colour gradient legend ranging from yellow (lower rates) to dark red (higher rates). | true | true | false | false | false | false | false | false | 1 | true | medium | false | null | 2026-08-02T02:12:41.118860 | ||
cfa66e48c7c6f62346f72153ba461b70 | http://apps-production.s3.amazonaws.com/media/CACHE/images/graphics/webseachange-world-fishprotien-c3/ec3ca907c3fd9d3e8610ad0efc9492e4.jpg | apps-production.s3.amazonaws.com | 1 | agriculture | 0.991823 | 1,125 | 577 | 1,125 | JPEG | 97,477 | 833518a53b6ffd648b7b390e7b5d80755c42de9c09a4403948a736e603d565c3 | bad0cd29e12d2d2b | 2026-08-01T13:58:51.177832 | World map with countries shaded in a sequential colour gradient (light yellow to red-orange) representing a percentage scale from less than 10% to more than 30%. Country and region labels are overlaid on the geographic base. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T00:20:20.007622 | |
cfa8b37b3bd9d5922a6b6a59e885a448 | electriccarsreport.com | 2.5 | data|range | 0.867895 | 640 | 504 | 640 | JPEG | 47,134 | f33ece16248f9147d03fee48c17624485ff79957ec6fa31046cfb42f27d2846a | a304d4f7bb8cf089 | 2026-08-01T13:38:38.810738 | Choropleth map of the United States showing the number of electric vehicle chargers per state, with absolute counts and percentages labeled in each state polygon and a color-gradient legend indicating density categories. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T22:58:14.372465 | ||
cfa911a8fb15d4b6a9008a4f1b23b122 | andrewoconnor.tech | 0 | 0.908827 | 837 | 570 | 837 | JPEG | 79,276 | f2ff2f4a2e661f6a8ba6f134c5b63370ea4bb9b48a732bfa03fc800a7ce40e01 | bf96c165c2633417 | 2026-08-01T12:52:06.611657 | Choropleth map of the United States showing the 2020 presidential election results by state, with blue states representing Joe Biden (278 electoral votes) and red states representing Donald Trump (260 electoral votes). State electoral vote counts are labeled within each state polygon. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-01T19:37:51.111472 | |||
cfadf8fb059aa3fe49e8e32d278835d1 | postcardmania.com | 10 | covid|survey|budget|by region|region | 0.965745 | 1,250 | 1,370 | 1,370 | JPEG | 457,413 | 52d6af429f335f8e3e73401c33d8854ff04cf0ac3d1738018b9bedc2e41cc498 | bf1e44c1690e16f6 | 2026-08-01T13:57:34.296133 | Choropleth map of the United States showing the share of businesses in each region that maintained or increased marketing spending, with five regional categories colour-coded and labelled with percentages. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-02T00:14:50.786961 | ||
cfaed097b0684fc71ce8d9ce15def0e8 | healthydogtreats.com.au | 4 | median|income | 0.992719 | 600 | 700 | 700 | JPEG | 42,494 | b236d52f6e6cd55aea49eaba384bf77b72c0b35066c8ad7f2b9e529ed04db0ae | bf3c6a1ac2c1e1e1 | 2026-08-01T13:10:15.617677 | Two choropleth maps of the United States: the top map shows USA dog treat interest in 2021 in solid blue shading by state; the bottom map displays median income by state in 2021 with a graduated green color legend ranging from $50,000 to $90,000. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T21:01:31.354147 | ||
cfb0a56871fc95b4f72730ca1c0427b3 | help.sender.net | 0 | 0.971707 | 805 | 565 | 805 | PNG | 43,420 | 1563f03ca4f845fe7f112480e2e96d40ce4874c89bf9e93c87feabf35b9e2f74 | b903c3f01f8778f0 | 2026-08-01T12:39:53.550504 | Geography report showing a choropleth map of North America with countries coloured by numeric values (Opens), accompanied by a data table on the right listing countries and their corresponding opens counts. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-01T18:40:51.710804 | |||
cfb1e2b1728e452a83f80be45d5d6808 | democratichumboldtfirst.files.wordpress.com | 0 | 0.999999 | 660 | 424 | 660 | JPEG | 35,885 | 35b5c54cece70990a905594752472d61c7300486b2e4b2354d38e7490de43bfe | eb1294ed9aca4b52 | 2026-08-01T11:59:53.514039 | Choropleth map of the United States showing estimated Republican voter support by state, with a sequential color gradient from light peach (28%) to dark red (37%) and a legend at the top. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T16:31:03.555332 | |||
cfb33e13b8db3f6b2321181d38b151d9 | http://manufacture.paliens.org/wp-content/uploads/2016/11/14877839_1434759313200840_459237413_n.jpg | manufacture.paliens.org | 0.5 | nombre de | 0.97288 | 600 | 466 | 600 | JPEG | 38,890 | 21b783bf8a180f3af04b653e75019bfef3810df9c1605d48e331053a3d418efa | bb8ed2694a721d13 | 2026-08-01T13:03:06.745626 | Choropleth map of the United States showing 2016 U.S. presidential election results by state, with states coloured blue (Clinton) or red (Trump) and electoral vote counts labelled. A bar chart at the top summarizes the national electoral vote totals. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-01T20:29:17.134564 | |
cfb35e3af937eff256dec40e62a9ddf1 | blog.clerk.io | 0 | 0.815471 | 917 | 687 | 917 | PNG | 69,665 | aa532b567de4f7294e05b635bfe8075a6319d10069abc326767eeef5e09b3044 | e11cdae19a3d0d71 | 2026-08-01T14:32:39.885035 | Proportional-symbol map of France showing the geographic distribution of e-commerce job offers by number, with larger circles indicating higher concentrations, particularly in the Paris region. | true | false | true | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T02:30:27.079470 | |||
cfb5c9cb7a9e7d1a96edf02579a24264 | kourosmaghsoudi.files.wordpress.com | 0 | 0.890369 | 534 | 413 | 534 | PNG | 35,469 | a9a0dd051c0dda993572d80854e932dd197e91691c3acd1548ff05c416a4a2c2 | c1c92a85366a1f3f | 2026-08-01T12:26:45.629053 | Choropleth map of New York City's five boroughs (Manhattan, Brooklyn, Queens, the Bronx, and Staten Island) showing sidewalk quality ratings by administrative unit, with a colour-coded legend ranging from low to high confidence ratings. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T17:34:45.716692 | |||
cfb5cd64f981bf5c4b60d525e3b2c437 | implicit.harvard.edu | 0 | 0.997055 | 798 | 406 | 798 | PNG | 256,706 | 05ae3e1c7b9f67e626c936586a9cfb0751953e21da9a47648615b84f7a3cd526 | b719c8d2c4e5780f | 2026-08-01T14:39:39.692811 | Choropleth map of the continental United States and Alaska showing Average Race IAT Score by county, with a sequential blue gradient legend indicating score ranges from 0.884 to 1.036. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T02:53:37.793187 | |||
cfb6790c6ad8c587a3ad5c4d32188579 | community.rstudio.com | 0.5 | data | 0.988139 | 428 | 500 | 500 | JPEG | 70,949 | dbee6873e84693cbeeff7fd556ac6e1b28ef8e91d7a06554231d7ce6fe35b0de | f838e4c785b752b0 | 2026-08-01T13:53:16.540046 | Four choropleth maps of England and Wales showing COVID-19 case rates per 100k (weekly) across local authority districts, each with different colour-break schemes and accompanying histograms illustrating alternative classification methods. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T23:57:12.551571 | ||
cfb8e21a0fa385ff0495468d9674851b | behcolumbia.files.wordpress.com | 0.5 | data | 0.894537 | 482 | 622 | 622 | JPEG | 71,865 | d2d811b72b294c590b7c867a7557ddb31c2483d67c5aa66568e5ab0587ede2cf | e3639d94621c2dcb | 2026-08-01T12:58:47.794137 | Choropleth map of New York City showing Walkability Index Score by 2010 Census Blocks and Quantile Classification, with a color gradient legend ranging from low (light pink) to high (dark red) values, green areas marking parks and cemeteries, and labeled boroughs (Manhattan, Bronx, Brooklyn, Queens, Staten Island). | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T20:08:19.732510 | ||
cfbba8598c434a152128ad1128db7e2d | http://www.armyworm.org/wp-content/uploads/2018/07/ArmyWormCount.jpg | armyworm.org | 0 | 0.988298 | 769 | 782 | 782 | JPEG | 203,590 | fa7d8318b78f80149c9dd0aca3c7b6f5ce83905411337aa8afc142d932ae0775 | ed1ab48bd2680de5 | 2026-08-01T12:46:52.675300 | Choropleth map of Africa showing the number of disease outbreaks by country, with a diverging colour legend ranging from light yellow (1–2 outbreaks) to dark red (31–61 outbreaks). | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T19:13:58.188918 | ||
cfbd4ae82110ae5f9aa299f5357babe4 | discuss.tp4.ir | 1 | index | 0.891672 | 631 | 500 | 631 | PNG | 38,803 | 176c312e2415e3e282286a5e750453c7f7447f39b98ff73ad6a933df718373a7 | e81b926c6d1b356c | 2026-08-01T15:11:47.878619 | World map showing countries shaded in a three-colour scheme (grey, yellow, orange, dark red) representing corruption perception or bribery prevalence when accessing public services. The title indicates this depicts the share of respondents who paid a bribe in the last 12 months. | true | true | false | false | false | false | false | false | 1 | true | medium | false | null | 2026-08-01T22:52:07.854883 | ||
cfbeb626f012db57aab4f678df3b103e | cleanhealthygreen.files.wordpress.com | -1 | screen | 0.917592 | 676 | 468 | 676 | PNG | 42,362 | e58056d41bb4ded6c80bba1ae2d8dc816f2b7f570776681f370b69f0a497df6b | ab9c976dca313813 | 2026-08-01T12:30:07.374107 | Choropleth map of the United States showing word-happiness scores by state, with a graduated colour gradient from light to dark blue and orange point markers highlighting cities with the highest average happiness scores. | true | true | true | false | false | false | false | false | 2 | true | medium | true | e58056d41bb4ded6 | 2026-08-01T17:52:08.758008 | ||
cfbf11f5997b661eb0ab048bd470960f | tropicalhainan.com | 0 | 0.858728 | 1,024 | 657 | 1,024 | JPEG | 70,202 | efe493832cf7600a244a00229ceaf332d96ad2e237570717306466e35435720c | a54c9b129e33cf61 | 2026-08-01T14:22:58.758327 | Choropleth map of China showing confirmed pneumonia cases by province as of February 7th, with case counts and deaths labeled within each administrative region. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-02T01:55:01.035203 | |||
cfc586cd300054d0605fbca2dfe7f60e | kosmo.at | 0 | 0.990777 | 650 | 648 | 650 | JPEG | 373,274 | a3bc3aac5ba11d20bbb769a6aa57012fb097aeb1a6feff5ccf92f83e8a8c6e5e | ff448739d01fb052 | 2026-08-01T12:25:33.893409 | Choropleth map of Europe showing the percentage of people born in a given country currently living abroad as a percentage of the current population, with data from the United Nations (2015). Countries are colored by a gradient from green (lower percentage) through blue and purple to red (higher percentage), with numeri... | true | true | false | false | false | false | false | false | 1 | null | medium | false | null | 2026-08-01T17:28:59.898625 | |||
cfc8a093f50672e17a1f785ed9be2dd0 | http://ascensionstrategy.com/wp-content/uploads/2015/04/Blog1Img1_0.jpg | ascensionstrategy.com | 0 | 0.999991 | 920 | 458 | 920 | JPEG | 48,959 | 389196f4581fff8ac51d80df45e0d9a2708f9dfdb79b697635c08354af6ab313 | bc1bc3253d3b30cc | 2026-08-01T13:23:55.308283 | Choropleth map of the United States showing results of a presidential election, with states colored blue (Obama/Democratic) or red (Romney/Republican). Electoral vote counts and popular vote totals are displayed at the top. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-01T22:00:25.984173 | ||
cfca0d7034f943b7e4a8b3c07d48fec4 | t4nky.files.wordpress.com | 0.5 | data | 0.977632 | 1,024 | 575 | 1,024 | PNG | 73,975 | 28fe7853b87bf46ee15aed283e1f6f14eb9683c3f97cf44266290fb8d022577f | 8725189c68e773dc | 2026-08-01T13:28:48.276148 | Choropleth world map showing numeric data (likely page views or site statistics) by country, with countries shaded in a gradient from white through yellow to red-orange, accompanied by a ranked list of countries on the left side. | true | true | false | false | false | false | false | false | 1 | false | medium | false | null | 2026-08-01T22:20:08.359777 | ||
cfd503239efcce4db70f69cf55483a91 | loneumbrella.files.wordpress.com | 0 | 0.994294 | 845 | 540 | 845 | PNG | 35,825 | 786029bb6de4ff7dbe3d9142e53635b64d713389f39524530f1ccac0dec2e435 | bf1ed2e5ccc1e048 | 2026-08-01T13:55:12.907576 | Choropleth map of the United States showing states coloured by the decade in which their senior senator entered office, with a legend indicating decades from 1970s to 2010s. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T00:05:17.097343 | |||
cfd895077b2799c8036e558651f9b849 | http://i0.kym-cdn.com/photos/images/original/001/183/130/c5b.png | i0.kym-cdn.com | 1 | states | 0.952293 | 803 | 604 | 803 | PNG | 104,607 | c5b6459b8319168834a171b48a045c5a722783fb120bad89b989d1ec4466877c | bf9ec0694a323c87 | 2026-08-01T13:33:28.040318 | Choropleth map of the United States showing the 2016 U.S. presidential election results by state, with states coloured blue (Clinton) or red (Trump) and their electoral vote counts displayed. A bar chart at the top shows the overall electoral vote totals and the winning threshold. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-01T22:38:27.606706 | |
cfdc09eb6cf8494bcc16f556d4b50e03 | mentalflowers.files.wordpress.com | 1 | states | 0.877172 | 720 | 1,309 | 1,309 | PNG | 99,328 | 86efccb8e7e7fe50a182a68f0af15b068e9067d397a685127c883c4ddf60b6b8 | eb3b94946368d896 | 2026-08-01T13:01:17.076139 | Infographic titled 'Where To Be Happy' showing a choropleth map of the United States colored by word happiness score across states, with orange dots marking cities with the highest happiness scores. Below the map is a bar chart comparing life satisfaction index across countries. | true | true | true | false | false | false | false | false | 2 | true | high | true | 86efccb8e7e7fe50 | 2026-08-01T20:20:47.716234 | ||
cfdeb13461a34d2e69a90e30fac0e115 | http://choosecompassion.net/wp-content/uploads/2017/09/75-of-earth-population-are-lactose-intolerant.jpg | choosecompassion.net | 2 | population | 0.929027 | 1,456 | 1,036 | 1,456 | JPEG | 226,830 | c9183f3ce25afc542a7b6c73214c43818ec683be1a2bd0e4dacbc665fab69272 | ec4f90b04f4e3693 | 2026-08-01T14:43:20.356563 | World choropleth map showing the prevalence of lactose intolerance by country, with a graduated colour legend ranging from 0% to 100% and a subtitle explaining that only one-third of adults can digest milk. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T03:06:24.706901 | |
cfe196c9c4e78e522939760788eed91c | http://www.samsblock.com/wp-content/uploads/2015/06/regional-same-sex-marriage.jpg | samsblock.com | 1 | sex | 0.907953 | 866 | 434 | 866 | JPEG | 38,192 | 1f0cc4afec011707beaa170afda8b2b3524873c1ce168ecc2d244141f4d5bd70 | 9e5ae36a1e01670f | 2026-08-01T11:25:28.953171 | Choropleth map of the United States showing regional interest in same-sex marriage by state, with darker blue shades indicating higher interest levels. A ranked list of top six states with corresponding interest indices appears on the right side. | true | true | false | false | false | false | false | false | 1 | null | medium | false | null | 2026-08-01T16:17:23.383345 | |
cfe7fad7e7a36af4318c294906a8351f | mycarinsurancequote.com | 0 | 0.99999 | 932 | 524 | 932 | JPEG | 26,459 | 49da166c7556353b5f43f28c55df5cce42445c4e6707865845dbab1ad0565161 | e83094afcb9a4771 | 2026-08-01T12:36:42.112563 | Choropleth map of the United States showing annual auto insurance premiums by state, with a diverging color scheme (blue for lower premiums, red for higher) and a ranked list of the top 10 most expensive states on the left. | true | true | false | false | false | false | false | false | 1 | true | medium | false | null | 2026-08-01T18:24:39.467570 | |||
cfe825b27eead4f877bcf2bc2a2f972c | http://cloudtweaks.com/wp-content/uploads/2016/11/net-neutral.png | cloudtweaks.com | 0.5 | net | 0.994562 | 1,590 | 761 | 1,590 | PNG | 164,913 | 37ca2708e243b2592d936216c5b6a45afa0a3659286906ca4e6742972ddf0a6b | 81a62f4f585179bc | 2026-08-01T12:52:29.229620 | World choropleth map showing net neutrality status by country, with countries coloured in shades of green, teal, white, and dark blue to indicate varying levels of net neutrality protection. A legend at the bottom displays the color scale and percentage ranges, and a sidebar on the right provides definitional text abou... | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T19:39:29.090807 | |
cfeb81aeb15389f334cba9a4b726f06a | occupymelbournenet.files.wordpress.com | 0 | 0.971311 | 603 | 427 | 603 | PNG | 36,688 | 395789372e86fe4c51093662916c3ef4335bbd5451b77e831d5bd819e0d485a1 | bb1ec1fde0607813 | 2026-08-01T12:32:32.214176 | Choropleth map of the United States showing the 2016 U.S. presidential election results by state, with states colored red (Trump), blue (Clinton), or gold (Rubio), and electoral vote counts labeled within each state. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-01T18:03:11.018814 | |||
cff456365000671a519eb4b2018c7ba9 | smartphonegreece439699244.files.wordpress.com | 0 | 0.981078 | 615 | 416 | 615 | PNG | 31,240 | a2681b9600a0a66072856bada4a7648c560c7d839db2ba6c32d2fa21366a2c7d | ac6c93916f2e3893 | 2026-08-01T13:13:02.400246 | Choropleth world map showing the geographic distribution of COVID-19 cases by country as of March 13, with a graduated color legend from light pink (1–5 cases) to dark red (over 1,000 cases), displaying total cases of 144,509 and deaths of 5,397. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T21:14:24.708004 | |||
cff760f36a6de919fc3d1773e585e98c | ovulinecom.files.wordpress.com | 0 | 0.99426 | 620 | 431 | 620 | JPEG | 46,804 | 94dd99fda7e2f7069f0f245727718b63977897270afb9e495f81148af7b7eeac | ab12d0f5cccae0dc | 2026-08-01T13:27:38.783760 | Choropleth map of the United States showing numeric values (average days per month) for each state, color-graded from purple (low) to red (high) with a legend at the bottom-left. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-01T22:15:26.078121 | |||
cff7e97653c9004979c1408b1ec75c40 | http://b1.vestifinance.ru/c/193655.jpg | b1.vestifinance.ru | 0 | 0.937458 | 2,492 | 1,920 | 2,492 | JPEG | 323,442 | e37a49119851cb73007b723493de62ac3d24a60870efc0e49ad26290765b243e | af1cd0e387ce6870 | 2026-08-01T13:00:49.298972 | Choropleth map of the United States showing November State Coincident Indices three-month changes by state, with a diverging red-to-green colour scheme representing ranges from losses to gains and a legend at the bottom. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T20:18:21.783873 | ||
cff8828f2c7541cef023f0d002b5079e | amcharts.com | 0 | 0.918301 | 1,113 | 750 | 1,113 | PNG | 216,492 | ef034ac6660665923f148c05d2d04f3c60aed099c803d1092af165c06a839b34 | d1d1f0a8af6e2e44 | 2026-08-01T14:34:04.274024 | World map showing COVID-19 spread data as of March 29, 2020, with proportional orange circles representing case counts at country/region locations. The map occupies the upper two-thirds of the image, with a time-series line chart of active cases below. | true | false | true | false | false | false | false | false | 1 | null | high | false | null | 2026-08-02T02:35:03.325233 | |||
cffcabfdb97af3cdc2f7eea88ce0548f | http://www.i-programmer.info/images/stories/News/2016/Aug/B/hackerrankmap.JPG | i-programmer.info | 0 | 0.948416 | 839 | 688 | 839 | JPEG | 47,911 | d0cc7eb508e5f83cd52f957e514df9e7f451e4d0be0cafbbfb2d860df3e2d9fb | ec2c91b06f6a49b5 | 2026-08-01T13:04:34.205738 | Choropleth world map showing countries ranked by average HackerRank programming challenge scores, with a sequential green colour gradient from rank 1 to 50 and unranked countries shown in grey. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-01T20:36:10.529397 | ||
cffce6e1a59191edfdfb48c752d4c353 | manperez.files.wordpress.com | 0 | 0.986247 | 640 | 763 | 763 | JPEG | 95,573 | 16c7b4e2c066b4203360142b9e02f1053a58bef2d4ce8e549c128a4b6346f598 | bb70cc0fc3164f83 | 2026-08-01T12:27:06.975880 | Choropleth map of the United States showing the number of patents by state (1977–2015), with U.S. states colored by patent density in a blue-to-pink gradient and surrounding countries labeled with total patent counts. | true | true | false | false | false | true | false | false | 2 | true | high | false | null | 2026-08-01T17:36:46.565489 | |||
cfffa9b52ff5bc9fbaf2fb7c90eaa6ee | visiontolearn.org | 0 | 0.89155 | 900 | 725 | 900 | PNG | 412,341 | 13b6599ebe9bc546cd29ac6ecb461fc54f623ac67f6d731b6fc8370f8185e0bc | bf1ec0e12c8f3370 | 2026-08-01T14:08:27.131891 | Choropleth map of the United States showing the percent of low-income students in public schools by state in 2013, with a five-tier colour gradient legend and state-level percentage labels. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T00:59:16.385823 | |||
d00094fd3bcdbadf1f89d71680fe8081 | digitalman.sk | 0 | 0.915853 | 1,024 | 769 | 1,024 | PNG | 283,644 | b173d62eb48932fffea99814ce864183f3c1d70e2def207283d3b924dc70a575 | ee1db0682f90b16d | 2026-08-01T14:55:47.782688 | World choropleth map showing the global spread of COVID-19 by confirmed cases per country, with a sequential red colour gradient legend and summary statistics displayed above. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-02T03:48:34.974602 | |||
d0036788d881885a4b079538bd37b897 | images.minilua.com | 0 | 0.980247 | 880 | 401 | 880 | JPEG | 28,095 | a65484ca15f27e9ba4c09d1866dc500a81b64a75e9198ae6dfb5ff0da977bdd1 | ae6ff11091e1f189 | 2026-08-01T14:28:46.510968 | World choropleth map showing metal bands per 100,000 people by country, with a sequential colour gradient legend ranging from 0 to 53.2 on the left side. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T02:16:34.138711 | |||
d0053ef246ee50e0634edc1827fc980e | attrip.jp | 0 | 0.838553 | 500 | 403 | 500 | PNG | 149,671 | 2180770492862be0d153924d18b3c14391431ed764b96a2fd4bff7c889933a0b | ce91b16e4fb1b034 | 2026-08-01T13:26:13.830740 | World map showing two overlaid choropleth layers: radiation intensity from the Fukushima incident (green to red gradient, left legend) and social media intensity of tweets about Fukushima (blue gradient, right legend) by country. | true | true | false | false | false | false | false | false | 1 | false | medium | false | null | 2026-08-01T22:09:39.441278 | |||
d008627da748b5ccef536fc0d4ffbaec | http://blog.shikaraacademy.com/wp-content/uploads/2019/10/Screenshot001-shik.jpg | blog.shikaraacademy.com | 2 | survey | 0.971419 | 768 | 512 | 768 | JPEG | 117,274 | 74abe0b5c9dc6db25d4e97e5050ae20649118f4b05b1a450e0aac080dda904de | acc3943cc3d49da5 | 2026-08-01T14:02:40.815118 | Choropleth map of India showing the number of deviations in overweight and obese adolescents by state, with a diverging colour gradient from light pink (2 deviations) to dark red (14 deviations). The infographic includes health statistics in text boxes on the left and a photograph of children at the bottom. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-02T00:35:54.418792 | |
d00aeffdccc65fcb31fb5bb1ad83383d | atlasmag.files.wordpress.com | 0 | 0.973743 | 825 | 678 | 825 | JPEG | 71,235 | b1de6adb1d9b9c35d517c3f022a537d1e0e8c93934cf64edd22a98896cc0c951 | ae84b13b18629f3b | 2026-08-01T13:51:50.270659 | Choropleth map of the United States showing Google search interest in 'brunch' by state, 2004–2015, with a sequential colour gradient legend ranging from 20 (pale yellow) to 50 (dark blue). | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T23:51:28.441672 | |||
d00c616e7d9d4e2c8b2bceb27b381d76 | static2.eghtesadnews.com | 0 | 0.990906 | 734 | 665 | 734 | PNG | 125,961 | 0e1dffda35678cfcda61a726e9366085def6eb11cc05f895771ce8a84962d19d | bf1ec1612d12b69c | 2026-08-01T12:18:28.276446 | A choropleth map of the United States showing the 2020 presidential election results by state, with Biden (blue) and Trump (red) vote allocations. The map includes electoral vote counts at the top, a POLITICO prediction panel for remaining votes, and a legend indicating wins, leads, and tied districts. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-01T16:56:24.169891 | |||
d0146ddac0cea45187db8b8c0ebb75b5 | timestamil.files.wordpress.com | 0 | 0.854987 | 427 | 590 | 590 | JPEG | 32,649 | 7787b2a3b0452bc0a36a67325e4e6cdffc9ce3c34c845264ad170424f8df8fd7 | ad0bf0d2d22f2d2c | 2026-08-01T14:05:19.400083 | Four choropleth maps of India showing the spatial trend of the Human Development Index across four time points (1981, 1991, 2001, 2008), with a shared legend indicating HDI categories from Very low to Very high. | true | true | false | false | false | false | false | false | 1 | true | high | true | 7787b2a3b0452bc0 | 2026-08-02T00:46:27.570456 | |||
d0155e0e29f41855fe0a2997134403ec | mediadaily.biz | 2 | media | 0.882574 | 696 | 492 | 696 | JPEG | 25,702 | b99a1a9bae8a9d7640c469de17c582f171a620d247ca51b48b2b169c1ce73dc5 | e96da5d956338854 | 2026-08-01T12:28:44.479467 | Choropleth map of Europe with administrative regions coloured by category and labelled with numeric values. Three statistics icons and values (410, 159, 71) appear in the lower-left corner. | true | true | false | false | false | false | false | false | 1 | null | medium | false | null | 2026-08-01T17:44:59.809452 | ||
d017f382b61d24d052323363208013bd | fox2now.com | 0 | 0.850267 | 1,280 | 720 | 1,280 | JPEG | 152,736 | 41f3249a08d1db614b64c307263d43dfde3d57115c7979c80f021fec4cec14b1 | eb4ba624956c926e | 2026-08-01T11:30:51.445857 | Choropleth map of postal code districts colored by case count, with numeric labels and postal codes overlaid on each administrative unit. | true | true | false | false | false | false | false | false | 1 | null | medium | false | null | 2026-08-01T16:22:34.793303 | |||
d019c511b025d50d629757730c968bf3 | http://www.smartcitiesconsulting.eu/wp-content/uploads/2015/10/bitcoin-map.jpg | smartcitiesconsulting.eu | 0 | 0.969144 | 890 | 693 | 890 | JPEG | 107,290 | 1e83ba9f648ecebbb17dec76d5740b9bd2a6abd383ed72934361797bf40f7d4d | ee0f8391b1bc3e05 | 2026-08-01T12:37:39.953594 | Choropleth world map titled 'Bitcoin Adoption by Country' showing Bitcoin nodes per 100,000 internet users by country, encoded in a sequential green gradient legend ranging from 0.0500 to 3.43. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T18:29:27.422475 | ||
d01bdd5b6d32c0ab39597c98e9a61bad | iranstar.com | 0 | 0.996502 | 1,710 | 1,248 | 1,710 | JPEG | 104,816 | 40df73f8a77dcb8431b406c0a49b7230106406a5ed0922a3afb4e88bcf33dadc | d68cab46d42b847b | 2026-08-01T13:05:50.378265 | Choropleth map of Canada showing a spatial phenomenon (likely population density or intensity) with a warm colour gradient from cream to deep red, accompanied by a population pyramid chart for Canada on the right side. | true | false | false | false | true | false | false | false | 1 | true | medium | false | null | 2026-08-01T20:41:46.394055 | |||
d01dc6ac9f38e9f637f9f63df6242fdf | http://zibelka.si/wp-content/uploads/2016/10/retail-google-3-3.jpg | zibelka.si | 0 | 0.982976 | 562 | 960 | 960 | JPEG | 111,448 | 84dd0f9d91926eb4364cbadc5136ffbe25f8cd11e6d8580a68c03969678376f9 | f45f075743d19434 | 2026-08-01T12:30:36.237027 | Three choropleth maps of the world showing population of 0–19 year olds by country in 1960, 1980, and 2015, with a sequential yellow-to-brown colour gradient indicating proportional share. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T17:54:34.532916 | ||
d01f5911fa8c65e5414b39abf64b2ced | tradesecurely.ca | 0 | 0.95719 | 1,195 | 510 | 1,195 | PNG | 187,993 | 4284e1e2ff3ff6c2ec926ece2413cdc25a627ae72e75eafe120cf968da95799f | a9b9f6c6a20853ec | 2026-08-01T14:36:42.806155 | World map with country flags and percentage labels highlighting specific nations across continents, with most landmasses shown in light gray and selected countries emphasized in green annotations. | true | false | true | false | false | false | false | false | 1 | null | medium | false | null | 2026-08-02T02:44:02.332470 | |||
d0273c6083590d561f40b48ada92a2b0 | mentalhelp.net | 0 | 0.890752 | 800 | 867 | 867 | JPEG | 114,930 | 4517f9d48a3b00a24dc90b81d882b2e8b0c8a45685b35878a81c7a7cc526da6e | b538c0ed7a1a97c4 | 2026-08-01T14:08:45.653206 | Choropleth map of the United States showing perceived knowledge of mental illness by state, with a gradient colour legend ranging from light blue (least informed) to dark purple (most informed) on a scale of 1–5. Some states are shaded with diagonal lines to indicate insufficient data. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-02T01:00:27.050106 | |||
d02aac85674c4d04a871d5be8669f514 | prod.wp.cdn.aws.wfu.edu | 1 | 地区 | 0.967545 | 1,125 | 666 | 1,125 | PNG | 69,419 | 411d0e5a61a9e042b89d91f9fe7b16acceab6d7972d6ba167cff3fddc6d4558f | bf1ec6b29887c18c | 2026-08-01T12:50:56.850180 | Choropleth map of the United States divided into six regions (West, Southwest, Midwest, South, Mid-Atlantic, and Northeast) with percentage labels displayed within each region's boundaries. Alaska and Hawaii are shown as insets in the lower-left. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-01T19:31:59.578476 | ||
d02e3571001d2cda2696dc7103315633 | imensosoftware.com | 0 | 0.947263 | 1,600 | 993 | 1,600 | WEBP | 726,674 | 0bbfa3bfa45f905b4a88b1b654ad5abb585f2c2d92ba4c52fc43639835abb7b2 | b76a68363360c89f | 2026-08-01T12:26:35.659287 | Choropleth world map showing Laravel usage by websites across countries, with countries shaded in graduated green tones from light to dark. A table on the right lists the leading countries by website count. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-01T17:33:49.391458 | |||
d02e4cc59eb174ff0a2e580db8fe5f32 | bengtgbengtssondod.files.wordpress.com | 2 | income | 0.960184 | 800 | 740 | 800 | PNG | 57,864 | cf7dba958468cb05f12abebb9ac4871146f6eb3ff16419d32a7434e5102b1607 | bb25c1d2944f5b2c | 2026-08-01T12:33:01.656786 | Choropleth map of Asia, Russia, and the Middle East showing countries classified by gross national income (GNI) per capita into four income groups, with a colour-coded legend at the bottom. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T18:05:33.122541 | ||
d02f9cfabcbb6d23adac8c439c6cecca | http://www.windowsobserver.com/wp-content/uploads/2011/02/internetspeedsinfographic_thumb.jpg | windowsobserver.com | 0 | 0.910266 | 432 | 484 | 484 | JPEG | 37,886 | d639528b8582df61ce9f9245575624a2e0b640e5a85ed0847e0f78b907c05f2f | c15b5ab42f4ba5b0 | 2026-08-01T13:39:26.853951 | World map showing internet speeds and costs across the top 20 nations in ITIF broadband rankings, with countries coloured by price tier (<$1 to >$20 per month). Below the map are a bar chart of average broadband speeds by country and a pie chart showing Japan's speed distribution. | true | true | true | false | false | false | false | false | 2 | true | high | false | null | 2026-08-01T23:01:42.883878 | ||
d031e876926febf1c0278dfed2830179 | cdn.breakit.se | 0 | 0.966379 | 980 | 500 | 980 | JPEG | 64,976 | c62e09132d01c7db5f9580c3b200aca52bccc2561f93ce676e54532d0f941ba9 | bab2c14b952d6c95 | 2026-08-01T13:44:05.406964 | Choropleth map of Finland showing regional data across municipalities with a graduated colour legend, accompanied by bar charts and a donut chart displaying frequency, price range, and temporal trends from 1985–2010. | true | true | false | false | false | false | false | false | 1 | true | medium | false | null | 2026-08-01T23:21:26.345793 | |||
d032d17ffff35c54f5f7d29e75377d4b | thuppahi.files.wordpress.com | 1 | religion | 0.996855 | 1,024 | 852 | 1,024 | PNG | 352,896 | de92663ec0a06e6b190e4d5342ae242d3d4f2f5ac4ee7014204db930fde88722 | ebb4b54292e107dc | 2026-08-01T14:11:10.954475 | Choropleth map of Australia showing population density across regions in people per square kilometre, with a sequential colour gradient legend from light yellow (less than 0.1) to dark red (100.0 or more). | true | false | false | false | true | false | false | false | 1 | true | high | false | null | 2026-08-02T01:10:34.802306 | ||
d037d943338e2878b3c75ad97183e6d4 | bizmedia.kz | 0 | 0.965557 | 823 | 800 | 823 | JPEG | 83,837 | 8b49728b878288e635c1fcc43f6299bd027d3ab65aa4b96d54722ee2f61f7806 | fa37c36870073e0d | 2026-08-01T14:16:17.988476 | Choropleth map of Europe showing per-capita and percentage values for each country, with a color gradient from dark blue to bright yellow-green. Each country displays a black label box with numeric data and percentages. | true | true | false | false | false | false | false | false | 1 | null | medium | false | null | 2026-08-02T01:29:44.194588 | |||
d039423f34d215ff473383faced1c3f6 | behinsanat.com | 0 | 0.98961 | 694 | 444 | 694 | PNG | 31,225 | d7d3582e3fe9be94074638db464e56776ef39fbdc246fe874a9bedce04e79935 | ee6a81b4b5a3c398 | 2026-08-01T12:17:12.479239 | World choropleth map showing exported value in USD thousands by country, with a colour-graduated legend ranging from N/A (grey) through light blue to dark red for the highest export values. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T16:50:31.079770 | |||
d0399e9651dde9007fefd4e23241bfa2 | shemalediary.files.wordpress.com | 0 | 0.920227 | 714 | 577 | 714 | PNG | 66,706 | 23bc8342bbd5e98a4625ab3df4747aed8b460a9514d3ab0f2fe1a59179a27538 | b31ec5a54c5872f2 | 2026-08-01T13:57:29.501587 | Choropleth map of the United States showing median income for millennials by state, with a five-tier colour gradient from light green ($18,000–$19,999) to dark green/black ($26,000–$43,000) and state-level income values labeled. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T00:14:24.193235 | |||
d03af66d97ccba633831500110499b44 | youhavetherighttoknow.files.wordpress.com | 0 | 0.962481 | 794 | 568 | 794 | PNG | 194,857 | 334a251699c8b326094fd844377e9ff5da51cb6171a2ea95aeb06d06eca87898 | ae6c999076074d6e | 2026-08-01T13:57:59.531873 | World choropleth map showing Freedom House's aggregate freedom scores and net changes by country from 2007–2011, with countries shaded in blue, tan, and red according to improvement or decline categories. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T00:16:38.676166 | |||
d03fa423fa5dff57af8206bfd408d8ed | qiita-image-store.s3.ap-northeast-1.amazonaws.com | 0 | 0.997154 | 798 | 481 | 798 | PNG | 219,424 | 86717b8527c6ec6eee696147c973319d7c7b215a7edd55d6ed438c1be058e4e0 | b439d866cb86a34d | 2026-08-01T14:18:35.561836 | World choropleth map showing the Big Mac Index by country, with a colour gradient legend ranging from 1.9 to 5.9 at the top right. Countries are shaded in tones from light cream to dark grey/black indicating relative price levels. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-02T01:38:08.783397 | |||
d04160c09a0a792df42adaf2ff914655 | nascsp.org | 0 | 0.972773 | 611 | 792 | 792 | JPEG | 280,463 | b283d318b86d7c0f5cd8e3d6588b64a412d2b46d784e86c7ca79315df0145021 | f846413c9ec1ed9a | 2026-08-01T13:37:49.509036 | Infographic on food insecurity and food costs in the United States, featuring a large choropleth map of the US showing food insecurity rates by county in shades of green, accompanied by statistics on insecurity rates, income bands, and meal costs. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T22:55:01.550498 | |||
d043ec38aa94f455d858f8ff363d97ba | http://www.undatarevolution.org/wp-content/uploads/2014/11/Screen-Shot-2014-11-05-at-10.27.58-PM-986x1024.png | undatarevolution.org | 0 | 0.865622 | 986 | 1,024 | 1,024 | PNG | 980,357 | 43bd9cd93ce93cd7032fe3366ffedab573a39ee3245cc0c15c2a1d2432a53d61 | ec979394936a6668 | 2026-08-01T13:14:48.890949 | Two side-by-side thematic maps of Côte d'Ivoire showing population density and communication patterns (top) and malaria prevalence and communication patterns (bottom), with coloured choropleth shading by sub-prefecture and weighted flow lines representing mobile phone calls between regions. | true | true | false | false | false | false | true | false | 2 | true | high | false | null | 2026-08-01T21:22:02.472747 | ||
d0445d3fb8d0914d50417abcb41c59ab | technologyreview.jp | 0 | 0.999985 | 1,127 | 989 | 1,127 | PNG | 304,299 | ab4363a4540c5bf7cc13b853f7ab933571cdc29925a3b565cb3fc84e8884c609 | ee0591664fd0b1bc | 2026-08-01T13:25:33.719670 | World choropleth map showing COVID-19 affected countries shaded in red gradations, with statistics on infected, deaths, recovered cases, and affected countries displayed above the map. | true | true | false | false | false | false | false | false | 1 | true | medium | false | null | 2026-08-01T22:07:07.381371 | |||
d0485c34c9c68bfe6c789ab2112066d8 | iwa.silverchair-cdn.com | 0 | 0.859997 | 520 | 409 | 520 | PNG | 196,517 | 7bd2fa2a3f3b549dd60768340ba80e1ad0c0616717dd4e3fb6b6ebf350137a05 | 9b44e45a48beb2ea | 2026-08-01T13:33:26.122200 | A collection of six choropleth maps showing spatial data across an administrative region (likely India or a South Asian territory), with four smaller time-series maps labeled DM1–DM4, one larger composite 'Final' map with a graduated color legend, and a reference map showing district boundaries in muted tones. | true | true | false | false | false | false | false | false | 1 | true | medium | false | null | 2026-08-01T22:38:12.997435 | |||
d04c1b8f1e7492d9495667270e0d69b6 | woodtv.com | 1 | women | 0.935264 | 1,920 | 1,080 | 1,920 | JPEG | 1,036,135 | c0c3190427daf75b7a0fb5fea4255bbd2abd00a9457777f56365daf9d01a05ad | f5923a8de46435c6 | 2026-08-01T13:15:20.655096 | Choropleth map of Michigan counties showing COVID-19 case counts as of August 29, with a quantitative legend ranging from 1–10 to 10,001+ cases per county. A statistics panel on the left displays total cases (103,186), daily increase (+718), and recovered cases (76,151). | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T21:24:39.745914 | ||
d04d0df81562f0d627532d8eeb26d2ed | clintballinger.files.wordpress.com | 0 | 0.993717 | 940 | 420 | 940 | PNG | 51,555 | 0dbdc69abf9c68ccbd46ab815174c3f78179b04271ea9b542157ee8b5e63b9c8 | ee3d9990a5e3c381 | 2026-08-01T13:11:23.618729 | World choropleth map showing Political Stability and Absence of Violence/Terrorism index by country, using a gradient color scheme from magenta (lowest scores) to dark green (highest scores). The map includes a legend with six quantitative ranges and a 'No data' category. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T21:06:28.236858 | |||
d04db4601e394b51f0813c88555b308b | thepointer.com | 2 | covid|covid-19 | 0.936975 | 1,294 | 1,000 | 1,294 | JPEG | 124,103 | 33ef37ea2dfc7ebb60bea445ea75b522272a5ed0082ec806f6b0d1e2c58e8e12 | af92f02f8de412c9 | 2026-08-01T14:18:28.541653 | Choropleth map of Canada showing the total probable and confirmed cases across provinces and territories, with a sequential blue colour gradient legend indicating case counts from 0 to >301. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T01:37:49.087018 | ||
d050729f32f58977d8df4c2ba242ae19 | wto.org | 3 | statistical | 0.950707 | 1,000 | 690 | 1,000 | PNG | 244,457 | dfe52d3892682fbdc2f18e3e5be06c07b5c7c84ad99ccf79e78e2bccbb17b2c8 | ae0f90b0e55eb4e4 | 2026-08-01T13:28:51.742951 | Choropleth world map showing countries shaded in a sequential blue gradient according to a legend measured in US$ billion (0–125, 125–250, 250–500, >500). The map fills the entire frame with minimal white space. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T22:20:28.263547 | ||
d0522701637d313c600dd046db0bb990 | evercare.ru | 2 | covid|covid-19 | 0.852803 | 1,047 | 588 | 1,047 | JPEG | 69,656 | 4e7cdaf063a983bc808025afc49b504542901782b852a8025f2b651ba75c2a03 | ed3a92862dc76538 | 2026-08-01T14:20:20.524218 | Choropleth map of the continental United States showing social connectedness by zip code relative to East Village, NY (zip code 10003), with a sequential colour gradient legend indicating ranking percentiles from bottom 15% to top 10%. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-02T01:44:49.253874 | ||
d05741f3a5f1451579f0ba7994a41aa9 | anyverm.files.wordpress.com | 7 | wage|by state|state | 0.978723 | 719 | 428 | 719 | PNG | 32,600 | a2339d6c92f1a17173883709476976f8410cce68186b5373c23d1000ec13d0d6 | c0e32c1a369f1f6c | 2026-08-01T13:39:36.319347 | Choropleth map of the United States showing the ratio of women's earnings to men's earnings by state, with values ranging from 0.64 to 0.89 displayed on each state polygon and a sequential green color gradient legend. | true | true | false | false | false | false | false | false | 1 | false | high | false | null | 2026-08-01T23:02:22.266449 | ||
d0582572d7cdfafac2d15ded2bb25be8 | thelifeofscience.files.wordpress.com | 0 | 0.969255 | 1,849 | 895 | 1,849 | JPEG | 108,299 | 0f98f74b40731fa36f53827af5ab75eac3ffe015d33e6964196a974132cc939a | b6765909483b5b0f | 2026-08-01T12:19:53.890609 | Choropleth map of the 2016 Global Hunger Index by country, with countries shaded in a gradient from green (low hunger) to red (extremely alarming hunger). A ranked list of top hunger-affected countries with numerical scores is displayed on the right side. | true | true | false | false | false | false | false | false | 1 | true | high | true | 0f98f74b40731fa3 | 2026-08-01T17:03:18.816503 | |||
d0597c954639d22b62d6f177da3fb5da | firstdraftnews.org | 0 | 0.99145 | 890 | 491 | 890 | JPEG | 63,127 | ab753c55fe177723f427270fe6157bf3d0c7fc5f2063341e55af58dc970cd03a | a3199e648c58b57b | 2026-08-01T12:50:12.247686 | Choropleth map of the United Kingdom showing regional variation in Twitter conversation metrics, with administrative units shaded in a blue-to-yellow gradient scale representing 1/100ths of 1% of conversation. | true | true | false | false | false | false | false | false | 1 | true | medium | true | ab753c55fe177723 | 2026-08-01T19:28:16.480758 | |||
d059a80abb92e8f11a41aa3080391a56 | blog-cannabis.com | 0 | 0.983362 | 1,024 | 691 | 1,024 | PNG | 119,608 | 2cc59b9305fe4fdbc6cf870030a97cda62d5e6737e3cbab9de50ab70cb4af88c | be9ac3663833b0cc | 2026-08-01T13:17:15.899077 | Choropleth map of the United States showing the 2020 Presidential Election results by state, with states coloured blue for Biden and red for Trump, accompanied by electoral vote totals and popular vote counts at the top. | true | true | false | false | false | false | false | false | 1 | null | high | false | null | 2026-08-01T21:32:36.402285 | |||
d05e2291f6ae286956a4d9bae02bb818 | ceowatermandate.org | 5 | by country|country | 0.994687 | 2,159 | 1,115 | 2,159 | PNG | 598,037 | 36212b3ba339c7b8358e883da8b65bd8f5812a8fc560ae2b18e3984ee7098e41 | 969765c85a796968 | 2026-08-01T13:03:26.886407 | Choropleth world map showing water stress by country, with a five-category colour legend ranging from low stress (yellow) to extremely high stress (dark red) based on the ratio of water withdrawals to renewable supply. | true | true | false | false | false | false | false | false | 1 | true | high | false | null | 2026-08-01T20:30:51.034918 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.