source
large_stringclasses
5 values
id
large_stringlengths
1
14
⌀
name
large_stringlengths
7
129
⌀
name_es
large_stringlengths
12
145
⌀
description
large_stringclasses
709 values
category
large_stringclasses
14 values
subcategory
large_stringclasses
36 values
area
large_stringclasses
5 values
used
bool
2 classes
group
large_stringclasses
7 values
column
large_stringclasses
35 values
availability
large_stringclasses
2 values
esios
2113
Morocco Import Emergency Support Program
Programa de apoyo de emergencia Marruecos importación
Support established under the request of a system that need assistance to solve an emergency situation when there aren’t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation…
Balancing services
Other services
cross-border
false
null
null
null
esios
2114
Morocco export Emergency Support Program
Programa de apoyo de emergencia Marruecos exportación
Support established under the request of a system that need assistance to solve an emergency situation when there aren’t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation…
Balancing services
Other services
cross-border
false
null
null
null
esios
2115
Andorra Import Emergency Support Program
Programa de apoyo de emergencia Andorra importación
Support established under the request of a system that need assistance to solve an emergency situation when there aren’t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation…
Balancing services
Other services
cross-border
false
null
null
null
esios
2116
Andorra export Emergency Support Program
Programa de apoyo de emergencia Andorra exportación
Support established under the request of a system that need assistance to solve an emergency situation when there aren’t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation…
Balancing services
Other services
cross-border
false
null
null
null
esios
10059
Interruptibility service providers demand Sectors
Demanda proveedores del servicio de interrumpibilidad Sectores
Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. The breakdown of this indicator details the interruptible demand by industrial…
Balancing services
Other services
Peninsula
false
null
null
null
esios
10321
Security energy allocated upward
Energía asignada por seguridad a subir
Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties…
Balancing services
Other services
Peninsula
false
null
null
null
esios
10322
Security energy allocated downward
Energía asignada por seguridad a bajar
Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties…
Balancing services
Other services
Peninsula
false
null
null
null
esios
10392
Weighted average price of additional reserve scheduled in real time
Precio medio ponderado programación de reserva adicional Tiempo Real
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Other services
Peninsula
false
null
null
null
esios
10412
Weighted average price active demand response service
Precio medio ponderado de activación del servicio de respuesta activa de la demanda
Active demand response service is a specific balance service of Spanish Electrical System that aims to deal with situations of shortage of upward balancing reserves by obtaining resources in addition to those already available through the use of standard European balancing services. This service…
Balancing services
Other services
Peninsula
false
null
null
null
esios
666
Replacement Reserves (RR) satisficed upward need
Necesidades cubiertas de energías de balance RR subir
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform…
Balancing services
RR
Peninsula
false
null
null
null
esios
667
Replacement Reserves (RR) satisficed downward need
Necesidades cubiertas de energías de balance RR bajar
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform…
Balancing services
RR
Peninsula
false
null
null
null
esios
715
Replacement Reserves payment obligations
Obligaciones de Pago de las necesidades cubiertas de energías de balance RR
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in the European…
Balancing services
RR
Peninsula
false
null
null
null
esios
1782
Replacement Reserves (RR) prices
Precio energías de balance RR
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. This service is…
Balancing services
RR
Peninsula
false
null
null
null
esios
1783
Upward RR allocation in SES
Asignación a subir de energías de balance RR SEE
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform…
Balancing services
RR
Peninsula
false
null
null
null
esios
1784
Downward RR allocation in SES
Asignación a bajar de energías de balance RR SEE
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform…
Balancing services
RR
Peninsula
false
null
null
null
esios
1787
Requested inelastic needs of Replacement Reserves (RR)
Necesidad inelástica solicitada de energías de balance RR
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Balancing services
RR
Peninsula
false
null
null
null
esios
1870
Requested elastic needs of Replacement Reserves (RR)
Necesidad elástica solicitada de energías de balance RR
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Balancing services
RR
Peninsula
false
null
null
null
esios
10054
Replacement Reserves (RR) satisficed need net absolute volume
Volumen absoluto de necesidades cubiertas de energías de balance RR
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform…
Balancing services
RR
Peninsula
false
null
null
null
esios
10251
Replacement Reserves (RR) satisficed need net volume
Volumen neto de necesidades cubiertas de energías de balance RR
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform…
Balancing services
RR
Peninsula
false
null
null
null
esios
10383
Total requested needs of Replacement Reserves (RR)
Necesidad total solicitada de energías de balance RR
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,…
Balancing services
RR
Peninsula
false
null
null
null
esios
10384
Weighted average price upward satisfied needs of replacement reserve (RR)
Precio medio ponderado de las necesidades cubiertas de energías de balance RR a subir
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. This service is…
Balancing services
RR
Peninsula
false
null
null
null
esios
10385
Weighted average price downward satisfied needs of replacement reserve (RR)
Precio medio ponderado de las necesidades cubiertas de energías de balance RR a bajar
Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated by O.P.-3.3. In particular, this…
Balancing services
RR
Peninsula
false
null
null
null
esios
720
Energy for Real Time Upward Technical Constraints
Energía asignada por restricciones en tiempo real a subir
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
721
Energy for Real Time Downward Technical Constraints
Energía asignada por restricciones en tiempo real a bajar
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
722
Average price of energy for real time Upward technical constraints
Precio medio de solución de Restricciones Técnicas de Seguridad en Tiempo Real subir
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
723
Average price of downward energy for real time technical constraints
Precio medio de solución de Restricciones Técnicas de Seguridad en Tiempo Real bajar
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
724
Real time technical constraints cost
Coste del proceso de solución de Restricciones Técnicas de Seguridad en Tiempo Real
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
725
Real time technical constraints unitary cost supported by the demand
Coste unitario soportado por la demanda del proceso de solución de Restricciones Técnicas de Seguridad en Tiempo Real
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1723
Real time upward technical constraints cost
Coste del proceso de solución de Restricciones Técnicas de Seguridad en Tiempo Real a Subir
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1724
Real time downward technical constraints cost
Coste del proceso de solución de Restricciones Técnicas de Seguridad en Tiempo Real a Bajar
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1726
Restricted energy with payment obligations for Real Time Downward Technical Constraints
Energía limitada con derechos de cobro por restricciones en tiempo real a bajar
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1802
Real time technical constraints energy allocated upward technical constraints SCB
Energía asignada por restricciones técnicas en tiempo real Subir SCB
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1803
Real time technical constraints energy allocated downward technical constraints SCB
Energía asignada por restricciones técnicas en tiempo real Bajar SCB
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1804
Real time technical constraints energy allocated upward SCA
Energía asignada por restricciones técnicas en tiempo real Subir SCA
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1805
Real time technical constraints energy allocated downward SCA
Energía asignada por restricciones técnicas en tiempo real Bajar SCA
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1806
Real time technical constraints energy allocated upward CT
Energía asignada por restricciones técnicas en tiempo real Subir CT
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1807
Real time technical constraints energy allocated downward CT
Energía asignada por restricciones técnicas en tiempo real Bajar CT
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1808
Real time technical constraints energy allocated upward RTD
Energía asignada por restricciones técnicas en tiempo real Subir RTD
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1809
Real time technical constraints energy allocated downward RTD
Energía asignada por restricciones técnicas en tiempo real Bajar RTD
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1812
Real time technical constraints energy allocated upward others
Energía asignada por restricciones técnicas en tiempo real Subir Otros
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1813
Real time technical constraints energy allocated downward others
Energía asignada por restricciones técnicas en tiempo real Bajar Otros
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1814
Real time technical constraints energy allocated upward RSI
Energía asignada por restricciones técnicas en tiempo real Subir RSI
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1815
Real time technical constraints energy allocated downward RSI
Energía asignada por restricciones técnicas en tiempo real Bajar RSI
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1816
Real time technical constraints energy allocated upward RBI
Energía asignada por restricciones técnicas en tiempo real Subir RBI
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1817
Real time technical constraints energy allocated downward RBI
Energía asignada por restricciones técnicas en tiempo real Bajar RBI
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1818
Real time technical constraints energy allocated upward ASE
Energía asignada por restricciones técnicas en tiempo real Subir ASE
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
1819
Real time technical constraints energy allocated downward ASE
Energía asignada por restricciones técnicas en tiempo real Bajar ASE
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10052
Absolute volume Energy for Real Time Technical Constraints Solution
Volumen absoluto de Energía asignada por restricciones en tiempo real
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. The…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10253
Net volume Energy for Real Time Technical Constraints Solution
Volumen neto de Energía asignada por restricciones en tiempo real
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. The…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10340
Weighted average price of energy for real time Upward technical constraints
Precio medio ponderado de solución de Restricciones Técnicas de Seguridad en Tiempo Real subir
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10341
Weighted average price of energy for real time Downward technical constraints
Precio medio ponderado de solución de Restricciones Técnicas de Seguridad en Tiempo Real bajar
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10368
Real time technical constraints energy allocated absolute volume technical constraints SCB
Energía asignada por restricciones técnicas en tiempo real Absoluto SCB
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10369
Real time technical constraints energy allocated absolute volume SCA
Energía asignada por restricciones técnicas en tiempo real Absoluto SCA
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10370
Real time technical constraints energy allocated absolute volume CT
Energía asignada por restricciones técnicas en tiempo real Absoluto CT
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10371
Real time technical constraints energy allocated absolute volume RTD
Energía asignada por restricciones técnicas en tiempo real Absoluto RTD
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10373
Real time technical constraints energy allocated absolute volume others
Energía asignada por restricciones técnicas en tiempo real Absoluto Otros
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10374
Real time technical constraints energy allocated absolute volume RSI
Energía asignada por restricciones técnicas en tiempo real Absoluto RSI
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10375
Real time technical constraints energy allocated absolute volume RBI
Energía asignada por restricciones técnicas en tiempo real Absoluto RBI
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10376
Real time technical constraints energy allocated absolute volume ASE
Energía asignada por restricciones técnicas en tiempo real Absoluto ASE
The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10377
Quarter-hourly average price technical constraints
Precio medio cuarto horario componente restricciones técnicas
In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of technical constraints within the weighted average quarter-hourly energy price for all types of consumers. For…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10456
Renewable curtailment in day-ahead technical constraints market due to congestions in the transmission grid (RTT)
Porcentaje de Energía Renovable No Integrable por restricciones técnicas RTT en el PDBF Fase 1
The day-ahead technical constraints market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (PDBF) through the modification of the schedules of the Programming Units by security criteria (Phase…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10457
Renewable curtailment in day-ahead technical constraints market due to conges-tions in the distribution grid (RTD)
Porcentaje de Energía Renovable No Integrable por restricciones técnicas RTD en PDBF Fase 1
The day-ahead technical constraints market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (PDBF) through the modification of the schedules of the Programming Units by security criteria (Phase…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10458
Renewable curtailment in real-time technical constraints market due to congestions in the transmission grid (RTT)
Porcentaje de Energía Renovable No Integrable por restricciones técnicas RTT en tiempo real
The real-time technical constraints market is carried out by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. This indicator…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10459
Renewable curtailment in real-time technical constraints market due to congestions in the distribution grid (RTD)
Porcentaje de Energía Renovable No Integrable por restricciones técnicas RTD en tiempo real
The real-time technical constraints market is carried out by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. This indicator…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10460
Renewable curtailment due to technical constraints in the transmission grid (RTT)
Porcentaje de Energía Renovable No Integrable por restricciones técnicas en la RTT
The technical constraints market is performed by the System Operator consisting on the resolution of technical constraints identified in the Spanish peninsular electric system in the Base Daily Operating Schedule (PDBF) and during the operation in real time. This service is regulated on the…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10461
Renewable curtailment due to technical constraints in the distribution grid (RTD)
Porcentaje de Energía Renovable No Integrable por restricciones técnicas en la RTD
The technical constraints market is performed by the System Operator consisting on the resolution of technical constraints identified in the Spanish peninsular electric system in the Base Daily Operating Schedule (PDBF) and during the operation in real time. This service is regulated on the…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
10462
Renewable curtailment due to technical constraints in the grid
Porcentaje de Energía Renovable No Integrable por restricciones técnicas
The technical constraints market is performed by the System Operator consisting on the resolution of technical constraints identified in the Spanish peninsular electric system in the Base Daily Operating Schedule (PDBF) and during the operation in real time. This service is regulated on the…
Balancing services
Technical constraints
Peninsula
false
null
null
null
esios
630
aFRR Reserve requirements upward
Requerimientos reserva de regulación secundaria a subir
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
631
aFRR Reserve requirements downward
Requerimientos reserva de regulación secundaria a bajar
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
632
aFRR Reserve allocation upward
Asignación reserva de regulación secundaria a subir
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
633
aFRR Reserve allocation downward
Asignación reserva de regulación secundaria a bajar
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
634
aFRR Reserve marginal price downward
Precio reserva de regulación secundaria a bajar
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
680
aFRR Activated energy upward
Energía activada de regulación secundaria a subir en el sepe
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
681
aFRR Activated energy downward
Energía activada de regulación secundaria a bajar en el sepe
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
682
aFRR Energy marginal price upward
Precio de energía de regulación secundaria a subir
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
683
aFRR Energy marginal price downward
Precio de energía de regulación secundaria a bajar
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
712
aFRR Reserve cost upward
Coste de reserva de regulación secundaria a subir
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
713
Unit cost supported by the demand for secondary regulation reserve
Coste unitario soportado por la demanda de reserva de regulación secundaria
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
719
aFRR Energy payments obligations
Obligaciones de pago por energía de regulación secundaria
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
899
aFRR Reserve allocation cost upward
Coste asignación de reserva de regulación secundaria a subir
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2127
aFRR Reserve cost downward
Coste de reserva de regulación secundaria a bajar
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2129
aFRR Reserve allocation cost downward
Coste asignación de reserva de regulación secundaria a bajar
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2130
aFRR Reserve marginal price upward
Precio Reserva de regulación secundaria a subir
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2207
aFRR activated energy upward
Necesidad de energía de regulación secundaria subir en el sepe
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2208
aFRR activated energy downward
Necesidad de energía de regulación secundaria bajar en el sepe
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2318
Number of enabled BSPs in aFRR balancing service
Número de BSPs habilitados en servicio de balance aFRR
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2329
Enabled capacity in aFRR Cogeneration
Potencia habilitada en aFRR Cogeneración
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2330
Enabled capacity in aFRR Wind
Potencia habilitada en aFRR Eólica
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2331
Enabled capacity in aFRR Other Renewables
Potencia habilitada en aFRR Otras Renovables
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2332
Enabled capacity in aFRR Non-Renewable Waste
Potencia habilitada en aFRR Residuos no Renovables
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2333
Enabled capacity in aFRR Solar Thermal
Potencia habilitada en aFRR Solar Térmica
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2334
Enabled capacity in aFRR Solar Photovoltaic
Potencia habilitada en aFRR Solar Fotovoltaica
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2335
Enabled capacity in aFRR Hydraulics
Potencia habilitada en aFRR Hidráulica
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2336
Enabled capacity in aFRR Hybridization
Potencia habilitada en aFRR Hibridación
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
2337
Enabled capacity in aFRR Storage
Potencia habilitada en aFRR Almacenamiento
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
10056
aFRR Absolute volume of activated energy
Volumen absoluto de energía utilizada de regulación secundaria
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
10388
aFRR Reserve weighted average price upward
Precio medio ponderado reserva de regulación secundaria a subir
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
esios
10463
aFRR Reserve weighted average price downward
Precio medio ponderado reserva de regulación secundaria a bajar
The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block…
Balancing services
aFRR
Peninsula
false
null
null
null
entsoe
A37
Balancing energy bids, mFRR, Spain (12.3.B/C)
null
Planned, parked: per-bid mFRR prices and volumes, to fill missing mFRR price with the mid-price at 100 MW depth. Needs the ENTSO-E File Library (API keeps ~100 days only). See PLAN.md.
Balancing services
mFRR
national
false
null
null
null
esios
672
Upward Tertiary reserve needs
Necesidad de Regulación Terciaria subir
The tertiary regulation is a complementary service of mandatory bid, managed and remunerated by market mechanisms. It aims to restore the secondary regulation reserve that has not been used. The allocation of the tertiary regulation service is done taking into account the bids sent to that end by…
Balancing services
mFRR
Peninsula
false
null
null
null