source large_stringclasses 5
values | id large_stringlengths 1 14 ⌀ | name large_stringlengths 7 129 ⌀ | name_es large_stringlengths 12 145 ⌀ | description large_stringclasses 709
values | category large_stringclasses 14
values | subcategory large_stringclasses 36
values | area large_stringclasses 5
values | used bool 2
classes | group large_stringclasses 7
values | column large_stringclasses 35
values | availability large_stringclasses 2
values |
|---|---|---|---|---|---|---|---|---|---|---|---|
esios | 2113 | Morocco Import Emergency Support Program | Programa de apoyo de emergencia Marruecos importación | Support established under the request of a system that need assistance to solve an emergency situation when there aren’t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation… | Balancing services | Other services | cross-border | false | null | null | null |
esios | 2114 | Morocco export Emergency Support Program | Programa de apoyo de emergencia Marruecos exportación | Support established under the request of a system that need assistance to solve an emergency situation when there aren’t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation… | Balancing services | Other services | cross-border | false | null | null | null |
esios | 2115 | Andorra Import Emergency Support Program | Programa de apoyo de emergencia Andorra importación | Support established under the request of a system that need assistance to solve an emergency situation when there aren’t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation… | Balancing services | Other services | cross-border | false | null | null | null |
esios | 2116 | Andorra export Emergency Support Program | Programa de apoyo de emergencia Andorra exportación | Support established under the request of a system that need assistance to solve an emergency situation when there aren’t other means to solve it. These assistance schedules are framed through specific agreements between the systems sharing the interconnection. They are also included in Operation… | Balancing services | Other services | cross-border | false | null | null | null |
esios | 10059 | Interruptibility service providers demand Sectors | Demanda proveedores del servicio de interrumpibilidad Sectores | Is the value of active power that would be stopped from being consumed by the interruptibility service providers in case that an order of power reduction less its residual power (maximum contracted power) was applied. The breakdown of this indicator details the interruptible demand by industrial… | Balancing services | Other services | Peninsula | false | null | null | null |
esios | 10321 | Security energy allocated upward | Energía asignada por seguridad a subir | Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties… | Balancing services | Other services | Peninsula | false | null | null | null |
esios | 10322 | Security energy allocated downward | Energía asignada por seguridad a bajar | Technical constraints solution process PBF or Daily security market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (Phase I) through the modification of the schedules of the Programming Unties… | Balancing services | Other services | Peninsula | false | null | null | null |
esios | 10392 | Weighted average price of additional reserve scheduled in real time | Precio medio ponderado programación de reserva adicional Tiempo Real | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Other services | Peninsula | false | null | null | null |
esios | 10412 | Weighted average price active demand response service | Precio medio ponderado de activación del servicio de respuesta activa de la demanda | Active demand response service is a specific balance service of Spanish Electrical System that aims to deal with situations of shortage of upward balancing reserves by obtaining resources in addition to those already available through the use of standard European balancing services. This service… | Balancing services | Other services | Peninsula | false | null | null | null |
esios | 666 | Replacement Reserves (RR) satisficed upward need | Necesidades cubiertas de energías de balance RR subir | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 667 | Replacement Reserves (RR) satisficed downward need | Necesidades cubiertas de energías de balance RR bajar | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 715 | Replacement Reserves payment obligations | Obligaciones de Pago de las necesidades cubiertas de energías de balance RR | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in the European… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 1782 | Replacement Reserves (RR) prices | Precio energías de balance RR | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. This service is… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 1783 | Upward RR allocation in SES | Asignación a subir de energías de balance RR SEE | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 1784 | Downward RR allocation in SES | Asignación a bajar de energías de balance RR SEE | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 1787 | Requested inelastic needs of Replacement Reserves (RR) | Necesidad inelástica solicitada de energías de balance RR | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 1870 | Requested elastic needs of Replacement Reserves (RR) | Necesidad elástica solicitada de energías de balance RR | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 10054 | Replacement Reserves (RR) satisficed need net absolute volume | Volumen absoluto de necesidades cubiertas de energías de balance RR | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 10251 | Replacement Reserves (RR) satisficed need net volume | Volumen neto de necesidades cubiertas de energías de balance RR | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. The allocation of RR energy is done in a European platform… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 10383 | Total requested needs of Replacement Reserves (RR) | Necesidad total solicitada de energías de balance RR | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated on the O.P.-3.3. In particular,… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 10384 | Weighted average price upward satisfied needs of replacement reserve (RR) | Precio medio ponderado de las necesidades cubiertas de energías de balance RR a subir | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation, respectively) to be prepared for possible system imbalances that may be registered later. This service is… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 10385 | Weighted average price downward satisfied needs of replacement reserve (RR) | Precio medio ponderado de las necesidades cubiertas de energías de balance RR a bajar | Energies from Replacement Reserves (RR) are the active power reserves available to restore or support the required level of frequency restoration reserves (tertiary and secondary regulation) to be prepared for additional system imbalances. This service is regulated by O.P.-3.3. In particular, this… | Balancing services | RR | Peninsula | false | null | null | null |
esios | 720 | Energy for Real Time Upward Technical Constraints | Energía asignada por restricciones en tiempo real a subir | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 721 | Energy for Real Time Downward Technical Constraints | Energía asignada por restricciones en tiempo real a bajar | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 722 | Average price of energy for real time Upward technical constraints | Precio medio de solución de Restricciones Técnicas de Seguridad en Tiempo Real subir | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 723 | Average price of downward energy for real time technical constraints | Precio medio de solución de Restricciones Técnicas de Seguridad en Tiempo Real bajar | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 724 | Real time technical constraints cost | Coste del proceso de solución de Restricciones Técnicas de Seguridad en Tiempo Real | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 725 | Real time technical constraints unitary cost supported by the demand | Coste unitario soportado por la demanda del proceso de solución de Restricciones Técnicas de Seguridad en Tiempo Real | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1723 | Real time upward technical constraints cost | Coste del proceso de solución de Restricciones Técnicas de Seguridad en Tiempo Real a Subir | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1724 | Real time downward technical constraints cost | Coste del proceso de solución de Restricciones Técnicas de Seguridad en Tiempo Real a Bajar | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1726 | Restricted energy with payment obligations for Real Time Downward Technical Constraints | Energía limitada con derechos de cobro por restricciones en tiempo real a bajar | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1802 | Real time technical constraints energy allocated upward technical constraints SCB | Energía asignada por restricciones técnicas en tiempo real Subir SCB | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1803 | Real time technical constraints energy allocated downward technical constraints SCB | Energía asignada por restricciones técnicas en tiempo real Bajar SCB | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1804 | Real time technical constraints energy allocated upward SCA | Energía asignada por restricciones técnicas en tiempo real Subir SCA | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1805 | Real time technical constraints energy allocated downward SCA | Energía asignada por restricciones técnicas en tiempo real Bajar SCA | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1806 | Real time technical constraints energy allocated upward CT | Energía asignada por restricciones técnicas en tiempo real Subir CT | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1807 | Real time technical constraints energy allocated downward CT | Energía asignada por restricciones técnicas en tiempo real Bajar CT | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1808 | Real time technical constraints energy allocated upward RTD | Energía asignada por restricciones técnicas en tiempo real Subir RTD | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1809 | Real time technical constraints energy allocated downward RTD | Energía asignada por restricciones técnicas en tiempo real Bajar RTD | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1812 | Real time technical constraints energy allocated upward others | Energía asignada por restricciones técnicas en tiempo real Subir Otros | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1813 | Real time technical constraints energy allocated downward others | Energía asignada por restricciones técnicas en tiempo real Bajar Otros | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1814 | Real time technical constraints energy allocated upward RSI | Energía asignada por restricciones técnicas en tiempo real Subir RSI | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1815 | Real time technical constraints energy allocated downward RSI | Energía asignada por restricciones técnicas en tiempo real Bajar RSI | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1816 | Real time technical constraints energy allocated upward RBI | Energía asignada por restricciones técnicas en tiempo real Subir RBI | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1817 | Real time technical constraints energy allocated downward RBI | Energía asignada por restricciones técnicas en tiempo real Bajar RBI | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1818 | Real time technical constraints energy allocated upward ASE | Energía asignada por restricciones técnicas en tiempo real Subir ASE | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 1819 | Real time technical constraints energy allocated downward ASE | Energía asignada por restricciones técnicas en tiempo real Bajar ASE | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10052 | Absolute volume Energy for Real Time Technical Constraints Solution | Volumen absoluto de Energía asignada por restricciones en tiempo real | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. The… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10253 | Net volume Energy for Real Time Technical Constraints Solution | Volumen neto de Energía asignada por restricciones en tiempo real | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. The… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10340 | Weighted average price of energy for real time Upward technical constraints | Precio medio ponderado de solución de Restricciones Técnicas de Seguridad en Tiempo Real subir | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10341 | Weighted average price of energy for real time Downward technical constraints | Precio medio ponderado de solución de Restricciones Técnicas de Seguridad en Tiempo Real bajar | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10368 | Real time technical constraints energy allocated absolute volume technical constraints SCB | Energía asignada por restricciones técnicas en tiempo real Absoluto SCB | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10369 | Real time technical constraints energy allocated absolute volume SCA | Energía asignada por restricciones técnicas en tiempo real Absoluto SCA | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10370 | Real time technical constraints energy allocated absolute volume CT | Energía asignada por restricciones técnicas en tiempo real Absoluto CT | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10371 | Real time technical constraints energy allocated absolute volume RTD | Energía asignada por restricciones técnicas en tiempo real Absoluto RTD | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10373 | Real time technical constraints energy allocated absolute volume others | Energía asignada por restricciones técnicas en tiempo real Absoluto Otros | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10374 | Real time technical constraints energy allocated absolute volume RSI | Energía asignada por restricciones técnicas en tiempo real Absoluto RSI | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10375 | Real time technical constraints energy allocated absolute volume RBI | Energía asignada por restricciones técnicas en tiempo real Absoluto RBI | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10376 | Real time technical constraints energy allocated absolute volume ASE | Energía asignada por restricciones técnicas en tiempo real Absoluto ASE | The technical constraints solution process in Real Time is executed by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. In… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10377 | Quarter-hourly average price technical constraints | Precio medio cuarto horario componente restricciones técnicas | In this section, the average final price of energy is published, calculated according to the criteria of the current Resolution. Specifically, this indicator refers to the component of technical constraints within the weighted average quarter-hourly energy price for all types of consumers. For… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10456 | Renewable curtailment in day-ahead technical constraints market due to congestions in the transmission grid (RTT) | Porcentaje de Energía Renovable No Integrable por restricciones técnicas RTT en el PDBF Fase 1 | The day-ahead technical constraints market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (PDBF) through the modification of the schedules of the Programming Units by security criteria (Phase… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10457 | Renewable curtailment in day-ahead technical constraints market due to conges-tions in the distribution grid (RTD) | Porcentaje de Energía Renovable No Integrable por restricciones técnicas RTD en PDBF Fase 1 | The day-ahead technical constraints market is the process carried out by the System operator consisting on the resolution of technical constraints identified in the Base Daily Operating Schedule (PDBF) through the modification of the schedules of the Programming Units by security criteria (Phase… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10458 | Renewable curtailment in real-time technical constraints market due to congestions in the transmission grid (RTT) | Porcentaje de Energía Renovable No Integrable por restricciones técnicas RTT en tiempo real | The real-time technical constraints market is carried out by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. This indicator… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10459 | Renewable curtailment in real-time technical constraints market due to congestions in the distribution grid (RTD) | Porcentaje de Energía Renovable No Integrable por restricciones técnicas RTD en tiempo real | The real-time technical constraints market is carried out by the System Operator consisting on the resolution of technical constraints identified during the operation in real time through the modification of the Programming Units schedules. This service is regulated on the O.P.-3.2. This indicator… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10460 | Renewable curtailment due to technical constraints in the transmission grid (RTT) | Porcentaje de Energía Renovable No Integrable por restricciones técnicas en la RTT | The technical constraints market is performed by the System Operator consisting on the resolution of technical constraints identified in the Spanish peninsular electric system in the Base Daily Operating Schedule (PDBF) and during the operation in real time. This service is regulated on the… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10461 | Renewable curtailment due to technical constraints in the distribution grid (RTD) | Porcentaje de Energía Renovable No Integrable por restricciones técnicas en la RTD | The technical constraints market is performed by the System Operator consisting on the resolution of technical constraints identified in the Spanish peninsular electric system in the Base Daily Operating Schedule (PDBF) and during the operation in real time. This service is regulated on the… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 10462 | Renewable curtailment due to technical constraints in the grid | Porcentaje de Energía Renovable No Integrable por restricciones técnicas | The technical constraints market is performed by the System Operator consisting on the resolution of technical constraints identified in the Spanish peninsular electric system in the Base Daily Operating Schedule (PDBF) and during the operation in real time. This service is regulated on the… | Balancing services | Technical constraints | Peninsula | false | null | null | null |
esios | 630 | aFRR Reserve requirements upward | Requerimientos reserva de regulación secundaria a subir | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 631 | aFRR Reserve requirements downward | Requerimientos reserva de regulación secundaria a bajar | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 632 | aFRR Reserve allocation upward | Asignación reserva de regulación secundaria a subir | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 633 | aFRR Reserve allocation downward | Asignación reserva de regulación secundaria a bajar | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 634 | aFRR Reserve marginal price downward | Precio reserva de regulación secundaria a bajar | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 680 | aFRR Activated energy upward | Energía activada de regulación secundaria a subir en el sepe | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 681 | aFRR Activated energy downward | Energía activada de regulación secundaria a bajar en el sepe | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 682 | aFRR Energy marginal price upward | Precio de energía de regulación secundaria a subir | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 683 | aFRR Energy marginal price downward | Precio de energía de regulación secundaria a bajar | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 712 | aFRR Reserve cost upward | Coste de reserva de regulación secundaria a subir | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 713 | Unit cost supported by the demand for secondary regulation reserve | Coste unitario soportado por la demanda de reserva de regulación secundaria | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 719 | aFRR Energy payments obligations | Obligaciones de pago por energía de regulación secundaria | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 899 | aFRR Reserve allocation cost upward | Coste asignación de reserva de regulación secundaria a subir | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2127 | aFRR Reserve cost downward | Coste de reserva de regulación secundaria a bajar | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2129 | aFRR Reserve allocation cost downward | Coste asignación de reserva de regulación secundaria a bajar | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2130 | aFRR Reserve marginal price upward | Precio Reserva de regulación secundaria a subir | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2207 | aFRR activated energy upward | Necesidad de energía de regulación secundaria subir en el sepe | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2208 | aFRR activated energy downward | Necesidad de energía de regulación secundaria bajar en el sepe | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2318 | Number of enabled BSPs in aFRR balancing service | Número de BSPs habilitados en servicio de balance aFRR | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2329 | Enabled capacity in aFRR Cogeneration | Potencia habilitada en aFRR Cogeneración | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2330 | Enabled capacity in aFRR Wind | Potencia habilitada en aFRR Eólica | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2331 | Enabled capacity in aFRR Other Renewables | Potencia habilitada en aFRR Otras Renovables | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2332 | Enabled capacity in aFRR Non-Renewable Waste | Potencia habilitada en aFRR Residuos no Renovables | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2333 | Enabled capacity in aFRR Solar Thermal | Potencia habilitada en aFRR Solar Térmica | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2334 | Enabled capacity in aFRR Solar Photovoltaic | Potencia habilitada en aFRR Solar Fotovoltaica | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2335 | Enabled capacity in aFRR Hydraulics | Potencia habilitada en aFRR Hidráulica | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2336 | Enabled capacity in aFRR Hybridization | Potencia habilitada en aFRR Hibridación | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 2337 | Enabled capacity in aFRR Storage | Potencia habilitada en aFRR Almacenamiento | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 10056 | aFRR Absolute volume of activated energy | Volumen absoluto de energía utilizada de regulación secundaria | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 10388 | aFRR Reserve weighted average price upward | Precio medio ponderado reserva de regulación secundaria a subir | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
esios | 10463 | aFRR Reserve weighted average price downward | Precio medio ponderado reserva de regulación secundaria a bajar | The secondary regulation corresponds to the European standard product for automatic frequency restoration reserve (aFRR). It is a service aimed at maintaining the generation–demand balance by automatically correcting any deviation regarding the exchange schedules forecasted in the control block… | Balancing services | aFRR | Peninsula | false | null | null | null |
entsoe | A37 | Balancing energy bids, mFRR, Spain (12.3.B/C) | null | Planned, parked: per-bid mFRR prices and volumes, to fill missing mFRR price with the mid-price at 100 MW depth. Needs the ENTSO-E File Library (API keeps ~100 days only). See PLAN.md. | Balancing services | mFRR | national | false | null | null | null |
esios | 672 | Upward Tertiary reserve needs | Necesidad de Regulación Terciaria subir | The tertiary regulation is a complementary service of mandatory bid, managed and remunerated by market mechanisms. It aims to restore the secondary regulation reserve that has not been used. The allocation of the tertiary regulation service is done taking into account the bids sent to that end by… | Balancing services | mFRR | Peninsula | false | null | null | null |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.