+ # Cross-Docking & Flow-Through Operations
2
+ **Document ID:** SC-XD-003 | **Version:** 2.9 | **Owner:** Sr. Director DC Ops
3
+ **Effective:** 2025-03-01 | **Review Cycle:** Annual
4
+
5
+ ## 1. Purpose
6
+ Standardizes cross-docking and flow-through procedures to minimize
7
+ touches, reduce dwell time, and accelerate store replenishment.
8
+
9
+ ## 2. Definitions
10
+ - **Cross-dock:** Inbound freight transferred directly to outbound
11
+ trailers without putaway. Touch count = 1.
12
+ - **Flow-through:** Freight moves through DC with minimal handling and
13
+ no long-term storage (dwell ≤ 12 hrs).
14
+ - **Traditional:** Freight received into storage, picked later.
15
+
16
+ ## 3. When to Cross-Dock
17
+ Cross-docking is mandatory when ALL of the following hold:
18
+ 1. SKU is on a **pre-distributed** or **allocation-driven** PO.
19
+ 2. Store demand is confirmed and static (no forecast variance > 10%).
20
+ 3. Inbound and outbound trailers can be co-scheduled within 4 hrs.
21
+ 4. Product has ≥ 30-day shelf life or is non-perishable.
22
+
23
+ ## 4. Cross-Dock Scheduling
24
+ | Window | Inbound Cutoff | Outbound Departure |
25
+ |---|---|---|
26
+ | AM wave | 22:00 prior day | 06:00 |
27
+ | Midday wave | 04:00 | 12:00 |
28
+ | PM wave | 10:00 | 18:00 |
29
+ | Night wave | 14:00 | 23:00 |
30
+
31
+ Scheduling rule: **Outbound trailer must be staged and sealed within
32
+ 90 minutes** of inbound unload completion.
33
+
34
+ ## 5. Yard Management
35
+ - Trailer dwell target: **≤ 3 hours** for cross-dock, **≤ 12 hours** for
36
+ flow-through.
37
+ - Yard checks performed every **4 hours**; trailer locations logged in YMS.
38
+ - Reefer trailers must maintain **continuous temperature telemetry**;
39
+ deviations trigger immediate QA notification.
40
+
41
+ ## 6. Pallet & Case Flow
42
+ 1. Inbound trailer unloaded in **store-route sequence**.
43
+ 2. Cases scanned at **dock door portal** to confirm routing label.
44
+ 3. Conveyor or forklift transfers to outbound lane.
45
+ 4. Outbound load built in **reverse-stop order**.
46
+ 5. Quality check: 1 pallet per trailer audited for label accuracy.
47
+
48
+ ## 7. Quality & Exception Handling
49
+ | Exception | Action | Owner |
50
+ |---|---|---|
51
+ | Mis-routed case | Re-label and re-stage | Flow Coordinator |
52
+ | Damaged pallet | Repack or reject | QC Associate |
53
+ | Temp deviation | Quarantine + QA | Food Safety |
54
+ | Missing case | File OS&D within 2 hrs | Inventory Control |
55
+ | Trailer mismatch | Hold load, escalate | Shift Manager |
56
+
57
+ ## 8. KPIs
58
+ | KPI | Target |
59
+ |---|---|
60
+ | Cross-dock % of total volume | ≥ 60% |
61
+ | Dwell time (cross-dock) | ≤ 3 hrs |
62
+ | Dwell time (flow-through) | ≤ 12 hrs |
63
+ | Touch count per case | ≤ 1.4 |
64
+ | Mis-route rate | ≤ 0.15% |
65
+
66
+ ## 9. Cost Impact
67
+ Cross-docking reduces handling cost by **~$0.18/case** and shortens
68
+ DC-to-store lead time by **6–10 hours** vs. traditional putaway.
69
+
70
+ ## 10. Escalation
71
+ - Real-time: Flow Coordinator → Shift Manager
72
+ - Network: DC GM → Regional Director (within 2 hrs)