Dataset card: operator rulings on the Tokamak metric version and the PDE solver-hybrid package
Browse files
README.md
CHANGED
|
@@ -89,6 +89,15 @@ trial (run 20261027a), which is the Design result shown in the plots. `finalizat
|
|
| 89 |
minutes; it is not backdated into the 48-hour curves. Purple markers denote those
|
| 90 |
reviewed post-budget results; orange marks denote reused scores for duplicate snapshots.
|
| 91 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 92 |
## Provenance and excluded material
|
| 93 |
|
| 94 |
Submissions were produced by the evaluated agent; reports by the native scientific
|
|
|
|
| 89 |
minutes; it is not backdated into the 48-hour curves. Purple markers denote those
|
| 90 |
reviewed post-budget results; orange marks denote reused scores for duplicate snapshots.
|
| 91 |
|
| 92 |
+
Two results carry operator rulings (2026-11-02). Tokamak is scored under the task's metric
|
| 93 |
+
v3 that the trial was pinned to (35 sealed episodes, timed-out episodes voided, so per-
|
| 94 |
+
candidate denominators vary from 32 to 35); the task specification moved to v4 (105 episodes,
|
| 95 |
+
no voiding) after the trial, and no rescoring was performed. The PDE surrogate final package,
|
| 96 |
+
from its sixteenth candidate onward, routes most datasets by case metadata to independently
|
| 97 |
+
implemented equation operators declared in its manifest; this is permitted by the task
|
| 98 |
+
contract and the scores stand, but from that point the reward mostly measures re-derivation
|
| 99 |
+
of the governing equations rather than a learned surrogate.
|
| 100 |
+
|
| 101 |
## Provenance and excluded material
|
| 102 |
|
| 103 |
Submissions were produced by the evaluated agent; reports by the native scientific
|