Download summary_by_iso.csv from tensorust/interconnection-queue-stalled-sample: direct link, hf CLI and curl.
- Browser
- Download file 148 Bytes
-
https://huggingface.co/datasets/tensorust/interconnection-queue-stalled-sample/resolve/main/summary_by_iso.csv
- Command line
-
hf download hf://datasets/tensorust/interconnection-queue-stalled-sample/summary_by_iso.csv
-
curl -L -o summary_by_iso.csv https://huggingface.co/datasets/tensorust/interconnection-queue-stalled-sample/resolve/main/summary_by_iso.csv
148 Bytes
| ISO,rows,Capacity (MW) | |
| PJM,2799,418039 | |
| ERCOT,1736,445898 | |
| MISO,1194,277249 | |
| SPP,678,139200 | |
| CAISO,261,73848 | |
| NYISO,236,36287 | |
| TOTAL,6904,1390521 | |