Nov 22 4 days ago 17:08 Stamp: correct commit hash 17:08 Stamp: correct commit hash 17:07 Stamp update: correct commit hash 17:06 Full sync: all notebook cells verified, repo clean, tests passing 17:05 Fix sync stamp commit hash 17:04 Final sync: all compendium parts, Xiao Hong v2, sequence rules, session history, playbook 17:03 Fix stamp: correct commit hash 17:03 Consolidated compendium: cross-shot continuity, editorial pacing, pre-release gates 17:02 Consolidated compendium from Parts VIII-XIII: cross-shot continuity, editorial pacing, pre-release gates, and the template index 17:01 Full sync: animation craft, crew runtime, sequence rules, Xiao Hong v2, session history 24 turns, and the complete craft compendium 17:00 Full sync: animation craft, crew runtime, sequence rules, session history, Xiao Hong v2 16:57 AGENTS.md specification: governance, critic rubric, sound architecture, pre-release checklist, shot list schema 16:55 Prompt craft, character bible, cross-style transitions, audio bridge, take diagnosis: the complete craft compendium 16:53 Xiao Hong v2 with score, utilisation audit, advance craft, crew governance 16:52 Advanced craft: post-production sound architecture, multi-agent governance, licensing, notebook hygiene, critic rubric, pre-release checklist 16:51 Master manual: the complete curriculum, crew doctrine, and production bible 16:49 The playbook: the Studio Head's operating blueprint, recorded verbatim 16:46 Sequence control rules R-S1..R-S5, chain-last-frame, production learnings, session history 24 turns 16:23 Xiao Hong and the Wolf: 5 scenes at native 704x1280, 40 steps, wuxia score 15:35 F15 (architecture from config), F16 (a signature is not access), F17 (-shortest cuts the film), R30, the working settings, and the first calibration number 14:06 Update repos: the review Space carries the quality fix, and the space folder is versioned 14:03 Local substitutes for the hosted API models: docs/23, four hires, six refusals, two new traps 14:01 Utilisation audit: what has actually run, what is idle, and the ordered plan. Hire Qwen-Image for casting stills 13:55 Curriculum learning: the industry structure mapped onto our seats, the gaps it exposes, and Phase 2.6 13:54 Learnings: R29 (run the model as documented), F9-F12 findings, the measured quality result, and the workflow-era note 13:35 Quality: official Wan settings (704x1280, 40 steps, negative prompt, structured prompt), the format trap on the animator, and docs/20 13:27 Publish the casting review Space, and version the space/ folder with the film 13:26 Model card with the empirical findings; the first 30-second film with narration 13:24 Model card: the selection record and the seven findings proved by running the models 13:12 Minutes of the house, with secrets redacted and a local secret scan added 13:09 Blueprint + decisions: the recipe, the signed waivers, R27/R28 12:56 Rebrand: the house and its mirror are BlueMorpho 12:54 Animation track: anime/cartoon seats, licence findings (NoobAI blocked), rule R26 12:53 Rename: blue-morpho -> blue-morpho-production-house 12:51 Casting test: cast the keeper, hold the look across shots, judge with the eyes (audit A2 answered) 12:42 Sync: ship .gitattributes so the stamp count matches the mirror exactly 12:42 Sync: the stamp now counts the payload it actually uploaded 12:41 Sync: the stamp now counts the payload it actually uploaded 12:41 Fix: the sync stamp must count the uploaded payload, not the working directory 12:41 Fix: the sync stamp must be uploaded, or verification is impossible 12:41 Add the sync discipline: publish command, drift stamp, MCP sync tools (R24/R25) 12:39 Collaboration patterns, independent coworker hire, generated docs 12:37 MCP surface + generated docs (MCP reference, repo map) 12:06 State: camera and eyes live, first plate scored 7/10 12:06 Camera + eyes live: first plate rendered and scored; handbook traps 11:59 Camera correction: A14B rehired as scheduled; TI2V-5B is the resident camera 11:54 Raise the standard: full precision, screen tests, office inventory 11:53 Hire the crew: licence-vetted roster + GPU call sheet + 35 tests 11:51 Add handbook + crew care (enforced) + tests; record audit progress 11:48 Add dataset card metadata and a cold-start resume protocol