DiffusionControl / results /pendulum /ablation_proj.log
matCercola18's picture
Add files using upload-large-folder tool
929e74d verified
Raw History Blame Contribute Delete
541 Bytes
Sector-projection ablation — steer→min effort on the pendulum (N=20, steps=120)
prior (no steering) effort med 10.801 stable 1.00 sector-valid 100% certified 1.00
steer WITH projection effort med 10.489 stable 1.00 sector-valid 100% certified 1.00
steer WITHOUT projection effort med 10.489 stable 1.00 sector-valid 100% certified 1.00
sector-valid = fraction of control points obeying the sign condition x·φ(x)>=0;
certified requires a valid sector, so it collapses once projection is removed.