new

Get trending papers in your email inbox!

Subscribe

Daily Papers

byAK and the research community

Aug 5

Delayed Repression and Emergent Instability in Adaptive Multi-Agent Systems

Regulatory institutions (from content moderation platforms to financial supervisors) observe, deliberate, and intervene only after a characteristic delay. We ask whether this processing lag alone can destabilize a multi-agent system that would otherwise remain stable, without exogenous shocks, coordination among agents, or malicious actors. We study this question in two stages. First, we analyze a delayed replicator equation in which autonomous agents receive a benefit from radical behavior but face punishment based on a lagged institutional alarm signal. We derive a closed-form critical delay threshold beyond which the unique interior equilibrium loses stability through a Hopf bifurcation, and prove via center manifold reduction that the bifurcation is supercritical (producing bounded oscillations, not explosive growth) for the entire sigmoid response-function family. Second, we embed N=240 agents on a network and equip them with reinforcement learning (tabular Q-learning), comparing three decision architectures in a factorial design: non-reactive agents (fixed policy), reactive agents (threshold heuristic without memory), and Q-learning agents (adaptive with cumulative value estimates). The results reveal a hierarchy opposite to the naive expectation that learning amplifies instability: non-reactive agents are immune to delay (0% runaway across all tested values), reactive agents collapse catastrophically (96% runaway by delay geq 8 steps), and Q-learning agents achieve partial resilience (66% runaway at delay = 20). The destabilizing ingredient is reactivity to delayed signals: agents that immediately exploit low-alarm windows trigger oscillatory feedback loops. Learning buffers this through implicit punishment memory encoded in Q-values

  • 1 authors
·
May 27

Critical Learning Periods Emerge Even in Deep Linear Networks

Critical learning periods are periods early in development where temporary sensory deficits can have a permanent effect on behavior and learned representations. Despite the radical differences between biological and artificial networks, critical learning periods have been empirically observed in both systems. This suggests that critical periods may be fundamental to learning and not an accident of biology. Yet, why exactly critical periods emerge in deep networks is still an open question, and in particular it is unclear whether the critical periods observed in both systems depend on particular architectural or optimization details. To isolate the key underlying factors, we focus on deep linear network models, and show that, surprisingly, such networks also display much of the behavior seen in biology and artificial networks, while being amenable to analytical treatment. We show that critical periods depend on the depth of the model and structure of the data distribution. We also show analytically and in simulations that the learning of features is tied to competition between sources. Finally, we extend our analysis to multi-task learning to show that pre-training on certain tasks can damage the transfer performance on new tasks, and show how this depends on the relationship between tasks and the duration of the pre-training stage. To the best of our knowledge, our work provides the first analytically tractable model that sheds light into why critical learning periods emerge in biological and artificial networks.

  • 3 authors
·
Aug 23, 2023

Graph-RHO: Critical-path-aware Heterogeneous Graph Network for Long-Horizon Flexible Job-Shop Scheduling

Long-horizon Flexible Job-Shop Scheduling~(FJSP) presents a formidable combinatorial challenge due to complex, interdependent decisions spanning extended time horizons. While learning-based Rolling Horizon Optimization~(RHO) has emerged as a promising paradigm to accelerate solving by identifying and fixing invariant operations, its effectiveness is hindered by the structural complexity of FJSP. Existing methods often fail to capture intricate graph-structured dependencies and ignore the asymmetric costs of prediction errors, in which misclassifying critical-path operations is significantly more detrimental than misclassifying non-critical ones. Furthermore, dynamic shifts in predictive confidence during the rolling process make static pruning thresholds inadequate. To address these limitations, we propose Graph-RHO, a novel critical-path-aware graph-based RHO framework. First, we introduce a topology-aware heterogeneous graph network that encodes subproblems as operation-machine graphs with multi-relational edges, leveraging edge-feature-aware message passing to predict operation stability. Second, we incorporate a critical-path-aware mechanism that injects inductive biases during training to distinguish highly sensitive bottleneck operations from robust ones. Third, we devise an adaptive thresholding strategy that dynamically calibrates decision boundaries based on online uncertainty estimation to align model predictions with the solver's search space. Extensive experiments on standard benchmarks demonstrate that Graph-RHO establishes a new state of the art in solution quality and computational efficiency. Remarkably, it exhibits exceptional zero-shot generalization, reducing solve time by over 30\% on large-scale instances (2000 operations) while achieving superior solution quality. Our code is available https://github.com/IntelliSensing/Graph-RHO{here}.

  • 5 authors
·
Apr 10

AlphaTransit: Learning to Design City-scale Transit Routes

Designing a transit network requires many sequential route extension decisions, but their quality is often visible only after the full network is assembled. This delayed-feedback challenge lies at the heart of the Transit Route Network Design Problem (TRNDP), where route interactions can be deceptive: an extension that appears useful locally can create transfer bottlenecks, produce redundant overlap, or reduce overall throughput. To guide route construction under delayed simulator feedback, we introduce AlphaTransit, a search-based planning framework for cityscale bus network design. AlphaTransit couples Monte Carlo Tree Search (MCTS) with a neural policy-value network: the policy proposes route extensions, the value estimates downstream design quality, and search uses these predictions to refine each decision. This provides decision-time lookahead during route construction without running simulator rollouts inside the search tree. We evaluate AlphaTransit on a new Bloomington TRNDP benchmark with realistic road topology and censusderived demand, under mixed and full transit demand settings. In the Bloomington network, AlphaTransit attains the highest service rate in both demand settings, reaching 54.6% and 82.1%, respectively. Relative to reinforcement learning without search, these correspond to 9.9% and 11.4% service rate gains; relative to MCTS without learned guidance, they correspond to 2.5% and 11.2% gains. These results suggest that coupling learned guidance with MCTS is more effective than using either approach alone for transit network design. Our code and data are publicly available in https://github.com/poudel-bibek/AlphaTransit.

  • 3 authors
·
May 26 2

Learning Delays in Spiking Neural Networks using Dilated Convolutions with Learnable Spacings

Spiking Neural Networks (SNNs) are a promising research direction for building power-efficient information processing systems, especially for temporal tasks such as speech recognition. In SNNs, delays refer to the time needed for one spike to travel from one neuron to another. These delays matter because they influence the spike arrival times, and it is well-known that spiking neurons respond more strongly to coincident input spikes. More formally, it has been shown theoretically that plastic delays greatly increase the expressivity in SNNs. Yet, efficient algorithms to learn these delays have been lacking. Here, we propose a new discrete-time algorithm that addresses this issue in deep feedforward SNNs using backpropagation, in an offline manner. To simulate delays between consecutive layers, we use 1D convolutions across time. The kernels contain only a few non-zero weights - one per synapse - whose positions correspond to the delays. These positions are learned together with the weights using the recently proposed Dilated Convolution with Learnable Spacings (DCLS). We evaluated our method on three datasets: the Spiking Heidelberg Dataset (SHD), the Spiking Speech Commands (SSC) and its non-spiking version Google Speech Commands v0.02 (GSC) benchmarks, which require detecting temporal patterns. We used feedforward SNNs with two or three hidden fully connected layers, and vanilla leaky integrate-and-fire neurons. We showed that fixed random delays help and that learning them helps even more. Furthermore, our method outperformed the state-of-the-art in the three datasets without using recurrent connections and with substantially fewer parameters. Our work demonstrates the potential of delay learning in developing accurate and precise models for temporal data processing. Our code is based on PyTorch / SpikingJelly and available at: https://github.com/Thvnvtos/SNN-delays

  • 3 authors
·
Jun 30, 2023

RelayS2S: A Dual-Path Speculative Generation for Real-Time Dialogue

Real-time spoken dialogue systems face a fundamental tension between latency and response quality. End-to-end speech-to-speech (S2S) models respond immediately and naturally handle turn-taking, backchanneling, and interruption, but produce semantically weaker outputs. Cascaded pipelines (ASR -> LLM) deliver stronger responses at the cost of latency that grows with model size. We present RelayS2S, a hybrid architecture that runs two paths in parallel upon turn detection. The fast path -- a duplex S2S model -- speculatively drafts a short response prefix that is streamed immediately to TTS for low-latency audio onset, while continuing to monitor live audio events. The slow path -- a cascaded ASR -> LLM pipeline -- generates a higher-quality continuation conditioned on the committed prefix, producing a seamless utterance. A lightweight learned verifier gates the handoff, committing the prefix when appropriate or falling back gracefully to the slow path alone. Experiments show that RelayS2S achieves P90 onset latency comparable to the S2S model while retaining 99% cascaded response quality in average score, with benefits growing as the slow-path model scales. Because the prefix handoff requires no architectural modification to either component, RelayS2S serves as a lightweight, drop-in addition to existing cascaded pipelines. Our code and data are publicly available at: https://github.com/mailong25/relays2s

  • 1 authors
·
Mar 24

Transform-Invariant Generative Ray Path Sampling for Efficient Radio Propagation Modeling

Ray tracing has become a standard for accurate radio propagation modeling, but suffers from exponential computational complexity, as the number of candidate paths scales with the number of objects raised to the power of the interaction order. This bottleneck limits its use in large-scale or real-time applications, forcing traditional tools to rely on heuristics to reduce the number of path candidates at the cost of potentially reduced accuracy. To overcome this limitation, we propose a comprehensive machine-learning-assisted framework that replaces exhaustive path searching with intelligent sampling via Generative Flow Networks. Applying such generative models to this domain presents significant challenges, particularly sparse rewards due to the rarity of valid paths, which can lead to convergence failures and trivial solutions when evaluating high-order interactions in complex environments. To ensure robust learning and efficient exploration, our framework incorporates three key architectural components. First, we implement an experience replay buffer to capture and retain rare valid paths. Second, we adopt a uniform exploratory policy to improve generalization and prevent the model from overfitting to simple geometries. Third, we apply a physics-based action masking strategy that filters out physically impossible paths before the model even considers them. As demonstrated in our experimental validation, the proposed model achieves substantial speedups over exhaustive search -- up to 10times faster on GPU and 1000times faster on CPU -- while maintaining high coverage accuracy and successfully uncovering complex propagation paths. The complete source code, tests, and tutorial are available at https://github.com/jeertmans/sampling-paths.

Separating source-intrinsic and Lorentz invariance violation induced delays in the very high energy emission of blazar flares

Aims: The aim of the present study is to explore how to disentangle energy-dependent time delays due to a possible Lorentz invariance violation (LIV) at Planck scale from intrinsic delays expected in standard blazar flares. Methods: We first characterise intrinsic time delays in BL Lacs and Flat Spectrum Radio Quasars in standard one-zone time-dependent synchrotron self-Compton or external Compton models, during flares produced by particle acceleration and cooling processes. We simulate families of flares with both intrinsic and external LIV-induced energy-dependent delays. Discrimination between intrinsic and LIV delays is then investigated in two different ways. A technique based on Euclidean distance calculation between delays obtained in the synchrotron and in the inverse-Compton spectral bumps is used to assess their degree of correlation. A complementary study is performed using spectral hardness versus intensity diagrams in both energy ranges. Results: We show that the presence of non-negligible LIV effects, which essentially act only at very high energies (VHE), can drastically reduce the strong correlation expected between the X-ray and the VHE gamma-ray emission in leptonic scenarios. The LIV phenomenon can then be hinted at measuring the Euclidean distance d_{E} from simultaneous X-ray and gamma-ray flare monitoring. Large values of minimal distance d_{E,min} would directly indicate the influence of non-intrinsic time delays possibly due to LIV in SSC flares. LIV effects can also significantly modify the VHE hysteresis patterns in hardness-intensity diagrams and even change their direction of rotation as compared to the X-ray behaviour. Both observables could be used to discriminate between LIV and intrinsic delays, provided high quality flare observations are available.

  • 3 authors
·
Jun 3, 2024

One-Step Gradient Delay is Not a Barrier for Large-Scale Asynchronous Pipeline Parallel LLM Pretraining

Modern large-scale LLM pretraining benefits from utilizing Pipeline Parallelism; however, synchronous implementations leave GPUs idle during pipeline bubbles, wasting computational resources. Asynchronous Pipeline Parallelism eliminates these bubbles, maximizing throughput at the cost of gradient staleness. Among asynchronous schedules, PipeDream-2BW is particularly appealing: unlike the original PipeDream schedule, it ensures a constant one-step gradient delay regardless of pipeline depth. However, its adoption remains limited due to the common belief that optimizing under staleness is fundamentally unstable. In this work, we challenge this assumption, demonstrating that degradation under one-step delay depends strongly on optimizer choice rather than being an intrinsic limitation. We provide the first comprehensive empirical analysis showing that while AdamW, the predominant optimizer at the time when PipeDream-2BW was introduced, indeed suffers from severe degradation, recent methods like Muon exhibit strong robustness under a one-step delay. We introduce an optimizer-agnostic Error Feedback-inspired correction to further mitigate delay effects. We provide supporting theoretical analysis demonstrating convergence for Muon with and without this correction. Extensive evaluation on models up to 10B parameters confirms that our strategies bridge the performance gap with synchronous training, highlighting the practical potential of asynchronous pipeline parallelism at scale.

PreRoutGNN for Timing Prediction with Order Preserving Partition: Global Circuit Pre-training, Local Delay Learning and Attentional Cell Modeling

Pre-routing timing prediction has been recently studied for evaluating the quality of a candidate cell placement in chip design. It involves directly estimating the timing metrics for both pin-level (slack, slew) and edge-level (net delay, cell delay), without time-consuming routing. However, it often suffers from signal decay and error accumulation due to the long timing paths in large-scale industrial circuits. To address these challenges, we propose a two-stage approach. First, we propose global circuit training to pre-train a graph auto-encoder that learns the global graph embedding from circuit netlist. Second, we use a novel node updating scheme for message passing on GCN, following the topological sorting sequence of the learned graph embedding and circuit graph. This scheme residually models the local time delay between two adjacent pins in the updating sequence, and extracts the lookup table information inside each cell via a new attention mechanism. To handle large-scale circuits efficiently, we introduce an order preserving partition scheme that reduces memory consumption while maintaining the topological dependencies. Experiments on 21 real world circuits achieve a new SOTA R2 of 0.93 for slack prediction, which is significantly surpasses 0.59 by previous SOTA method. Code will be available at: https://github.com/Thinklab-SJTU/EDA-AI.

  • 7 authors
·
Feb 26, 2024

Early warning signals: The charted and uncharted territories

The realization that complex systems such as ecological communities can collapse or shift regimes suddenly and without rapid external forcing poses a serious challenge to our understanding and management of the natural world. The potential to identify early warning signals that would allow researchers and managers to predict such events before they happen has therefore been an invaluable discovery that offers a way forward in spite of such seemingly unpredictable behavior. Research into early warning signals has demonstrated that it is possible to define and detect such early warning signals in advance of a transition in certain contexts. Here we describe the pattern emerging as research continues to explore just how far we can generalize these results. A core of examples emerges that shares three properties: the phenomenon of rapid regime shifts, a pattern of 'critical slowing down' that can be used to detect the approaching shift, and a mechanism of bifurcation driving the sudden change. As research has expanded beyond these core examples, it is becoming clear that not all systems that show regime shifts exhibit critical slowing down, or vice versa. Even when systems exhibit critical slowing down, statistical detection is a challenge. We review the literature that explores these edge cases and highlight the need for (a) new early warning behaviors that can be used in cases where rapid shifts do not exhibit critical slowing down, (b) the development of methods to identify which behavior might be an appropriate signal when encountering a novel system; bearing in mind that a positive indication for some systems is a negative indication in others, and (c) statistical methods that can distinguish between signatures of early warning behaviors and noise.

  • 3 authors
·
May 29, 2013

Graph-Based Self-Healing Tool Routing for Cost-Efficient LLM Agents

Tool-using LLM agents face a reliability-cost tradeoff: routing every decision through the LLM improves correctness but incurs high latency and inference cost, while pre-coded workflow graphs reduce cost but become brittle under unanticipated compound tool failures. We present Self-Healing Router, a fault-tolerant orchestration architecture that treats most agent control-flow decisions as routing rather than reasoning. The system combines (i) parallel health monitors that assign priority scores to runtime conditions such as tool outages and risk signals, and (ii) a cost-weighted tool graph where Dijkstra's algorithm performs deterministic shortest-path routing. When a tool fails mid-execution, its edges are reweighted to infinity and the path is recomputed -- yielding automatic recovery without invoking the LLM. The LLM is reserved exclusively for cases where no feasible path exists, enabling goal demotion or escalation. Prior graph-based tool-use systems (ControlLLM, ToolNet, NaviAgent) focus on tool selection and planning; our contribution is runtime fault tolerance with deterministic recovery and binary observability -- every failure is either a logged reroute or an explicit escalation, never a silent skip. Across 19 scenarios spanning three graph topologies (linear pipeline, dependency DAG, parallel fan-out), Self-Healing Router matches ReAct's correctness while reducing control-plane LLM calls by 93% (9 vs 123 aggregate) and eliminating the silent-failure cases observed in a well-engineered static workflow baseline under compound failures.

  • 1 authors
·
Mar 2

Representation over Routing: Diagnosing Temporal Routing Pathologies in Multi-Timescale PPO

Temporal credit assignment in reinforcement learning is often approached by introducing value estimates at multiple discount factors. A natural next step is to let the actor dynamically route among these temporal heads, using either differentiable attention or heuristic uncertainty weights. This paper argues that such routing can create a numerical shortcut rather than a reliable temporal abstraction. We study this issue in a controlled PPO setting on LunarLander-v2, using the environment as a visual sandbox for diagnosing failure modes. First, we formalize Surrogate Objective Hacking: a differentiable softmax router exposed to the PPO surrogate receives a direct gradient toward advantage heads that are numerically favorable for the current update, even when this routing change does not correspond to improved physical control. Because unnormalized advantages at different discount factors have different effective scales, this creates a scale-discrepancy vulnerability. Second, we identify the Paradox of Temporal Uncertainty in gradient-free error-based routing: short-horizon heads can receive the largest routing share because their prediction targets are easier, even when they are less aligned with delayed task success. As a structural response, we study Target Decoupling: the critic may retain multi-timescale auxiliary heads, but the actor is updated only with the long-horizon advantage. Target Decoupling is not presented as a broad performance booster; in this run set it removes the exploitable actor-side routing pathway and improves the observed worst-seed return. Code is available at https://github.com/ben-dlwlrma/Representation-Over-Routing.

  • 1 authors
·
May 29 4

Critical Nodes Identification in Complex Networks: A Survey

Complex networks have become essential tools for understanding diverse phenomena in social systems, traffic systems, biomolecular systems, and financial systems. Identifying critical nodes is a central theme in contemporary research, serving as a vital bridge between theoretical foundations and practical applications. Nevertheless, the intrinsic complexity and structural heterogeneity characterizing real-world networks, with particular emphasis on dynamic and higher-order networks, present substantial obstacles to the development of universal frameworks for critical node identification. This paper provides a comprehensive review of critical node identification techniques, categorizing them into seven main classes: centrality, critical nodes deletion problem, influence maximization, network control, artificial intelligence, higher-order and dynamic methods. Our review bridges the gaps in existing surveys by systematically classifying methods based on their methodological foundations and practical implications, and by highlighting their strengths, limitations, and applicability across different network types. Our work enhances the understanding of critical node research by identifying key challenges, such as algorithmic universality, real-time evaluation in dynamic networks, analysis of higher-order structures, and computational efficiency in large-scale networks. The structured synthesis consolidates current progress and highlights open questions, particularly in modeling temporal dynamics, advancing efficient algorithms, integrating machine learning approaches, and developing scalable and interpretable metrics for complex systems.

  • 8 authors
·
Jul 8, 2025

Three Phases of Expert Routing: How Load Balance Evolves During Mixture-of-Experts Training

We model Mixture-of-Experts (MoE) token routing as a congestion game with a single effective parameter, the congestion coefficient gamma_eff, that quantifies the balance-quality tradeoff. Tracking gamma_eff across training checkpoints of two open-source MoE models, OLMoE-1B-7B (20 checkpoints, with dense sampling in the surge region) and OpenMoE-8B (6 checkpoints), reveals a three-phase trajectory: a surge phase where the router learns to balance load (gamma_eff: 14 to 36-39, peaking in the step 30K-40K region), a stabilization phase where experts specialize under steady balance (B_0: 2.4 to 2.3, steps 100K-400K), and a relaxation phase where the router trades balance for quality as experts differentiate (gamma_eff: 27 to 9, steps 400K-1.2M). This non-monotone trajectory, invisible to post-hoc analysis of converged models, reveals that early MoE training prioritizes balance while late training prioritizes quality. The theoretical framework is honest about its limits: the single-type equilibrium reduces to temperature-scaled softmax (held-out L1: MFG = 0.199 vs. softmax = 0.200). The game is not a better predictor; it reveals what the temperature means and, critically, how that temperature evolves. We complement the dynamics with an effective congestion decomposition, a multi-type extension that improves load prediction via token clustering on all 16 layers (mean: 30%), scope diagnostics (K/M, epsilon_l), and robustness verification across four independent quality estimators (r >= 0.89). All confidence intervals are from bootstrap resampling over 50 independent text batches.

  • 1 authors
·
Apr 4

Challenging the Need for Packet Spraying in Large-Scale Distributed Training

Large-scale distributed training in production datacenters constitutes a challenging workload bottlenecked by network communication. In response, both major industry players (e.g., Ultra Ethernet Consortium) and parts of academia have surprisingly, and almost unanimously, agreed that packet spraying is necessary to improve the performance of large-scale distributed training workloads. In this paper, we challenge this prevailing belief and pose the question: How close can a singlepath transport approach an optimal multipath transport? We demonstrate that singlepath transport (from a NIC's perspective) is sufficient and can perform nearly as well as an ideal multipath transport with packet spraying, particularly in the context of distributed training in leaf-spine topologies. Our assertion is based on four key observations about workloads driven by collective communication patterns: (i) flows within a collective start almost simultaneously, (ii) flow sizes are nearly equal, (iii) the completion time of a collective is more crucial than individual flow completion times, and (iv) flows can be split upon arrival. We analytically prove that singlepath transport, using minimal flow splitting (at the application layer), is equivalent to an ideal multipath transport with packet spraying in terms of maximum congestion. Our preliminary evaluations support our claims. This paper suggests an alternative agenda for developing next-generation transport protocols tailored for large-scale distributed training.

  • 3 authors
·
Jun 29, 2024

Metronome: Bound the Cache, Keep the Beat for Real-Time Interaction Model Serving

Real-time interaction models -- Moshi, MiniCPM-o, Qwen-Omni -- turn serving into a periodic real-time task: on every frame a session ingests streaming audio and must respond by a recurring wall-clock deadline, while its KV cache grows monotonically and stays pinned for the whole conversation. This regime hides a dangerous failure mode. On a real full-duplex stack, sustained load does not degrade serving gracefully: it falls off a cliff, jumping in one step from milliseconds per frame to a stalled engine when accumulated session state exhausts the KV pool. The collapse is metastable -- identical five-minute runs collapse or survive on run-to-run variance -- and silent: latency and deadline-miss metrics read healthy throughout. We show one move restores both stability and observability: bound each session's resident state, and latency starts telling the truth. Metronome's in-engine KV window eliminates the collapse (0/20 vs. 14/20 runs across two batches) and turns per-frame latency into a monotone load signal, on which an online admission controller discovers the schedulable concurrency; without the window, the identical controller over-admits into the wall. A first-order model predicts the collapse time within a few percent on the headline model, and a quality probe validates the bound's design by ablation: the window alone is quality-free in turn-based decoding, and its few pinned attention-sink tokens are what keep free-running generation healthy. Everything is measured end-to-end on real audio, across four interaction models on one GPU.

  • 2 authors
·
Jul 1

Boosting Large-scale Parallel Training Efficiency with C4: A Communication-Driven Approach

The emergence of Large Language Models (LLMs) has necessitated the adoption of parallel training techniques, involving the deployment of thousands of GPUs to train a single model. Unfortunately, we have found that the efficiency of current parallel training is often suboptimal, largely due to the following two main issues. Firstly, hardware failures are inevitable, leading to interruptions in the training tasks. The inability to quickly identify the faulty components results in a substantial waste of GPU resources. Secondly, since GPUs must wait for parameter synchronization to complete before proceeding to the next round of computation, network congestions can greatly increase the waiting time for GPUs. To address these challenges, this paper introduces a communication-driven solution, namely the C4. The key insights of C4 are two folds. First, in parallel training, collective communication exhibits periodic and homogeneous characteristics, so any anomalies are certainly due to some form of hardware malfunction. By leveraging this feature, C4 can rapidly identify the faulty components, swiftly isolate the anomaly, and restart the task, thereby avoiding resource wastage caused by delays in anomaly detection. Second, the predictable communication model of collective communication, involving few large flows, allows C4 to efficiently execute traffic planning, substantially reducing network congestion. C4 has been extensively implemented across our production systems, cutting error-induced overhead by roughly 30% and enhancing runtime performance by about 15% for certain applications with moderate communication costs.

  • 25 authors
·
Jun 6, 2024

ACID: Adaptive Caching for vIDeo generation

Video diffusion models produce high-quality generations but remain slow at inference due to their sequential denoising procedure. Caching-based acceleration methods address this by reusing intermediate model outputs: leading dynamic approaches such as TeaCache, EasyCache, and DiCache accumulate a drift signal and skip expensive model evaluations when accumulated drift stays below a fixed threshold τ. This threshold controls an apparent tradeoff - raising it yields faster generation at the cost of visual quality, while lowering it preserves quality but sacrifices speed. We show this tradeoff is not fundamental; it is an artifact of holding τ constant throughout denoising. We identify the existence of critical steps - timesteps where the drift signal changes rapidly - and show that applying a low threshold selectively at these steps while caching aggressively elsewhere recovers most of the quality of conservative caching at substantially higher inference speeds. Building on this insight, we propose ACID, a lightweight, training-free wrapper that monitors the rate of change of each method's existing drift signal to dynamically switch between a low and a high threshold. ACID is signal-agnostic and modular: it requires no retraining and plugs directly into existing dynamic caching methods without modifying their core mechanisms. Evaluated across three caching methods (TeaCache, EasyCache, DiCache) and three open-source video diffusion models (HunyuanVideo, Wan 2.1, CogVideoX), ACID consistently expands the Pareto frontier of visual quality versus inference speed beyond what any fixed threshold achieves. In particular, on TeaCache and HunyuanVideo, ACID achieves up to 2.16x speedup over the no-caching baseline, and up to 38% additional speedup over the conservative fixed-threshold baseline with negligible (<0.3 dB PSNR, <0.01 SSIM, <0.01 LPIPS) quality degradation.

  • 3 authors
·
Jul 15

Admissible Velocity Propagation : Beyond Quasi-Static Path Planning for High-Dimensional Robots

Path-velocity decomposition is an intuitive yet powerful approach to address the complexity of kinodynamic motion planning. The difficult trajectory planning problem is solved in two separate, simpler, steps: first, find a path in the configuration space that satisfies the geometric constraints (path planning), and second, find a time-parameterization of that path satisfying the kinodynamic constraints. A fundamental requirement is that the path found in the first step should be time-parameterizable. Most existing works fulfill this requirement by enforcing quasi-static constraints in the path planning step, resulting in an important loss in completeness. We propose a method that enables path-velocity decomposition to discover truly dynamic motions, i.e. motions that are not quasi-statically executable. At the heart of the proposed method is a new algorithm -- Admissible Velocity Propagation -- which, given a path and an interval of reachable velocities at the beginning of that path, computes exactly and efficiently the interval of all the velocities the system can reach after traversing the path while respecting the system kinodynamic constraints. Combining this algorithm with usual sampling-based planners then gives rise to a family of new trajectory planners that can appropriately handle kinodynamic constraints while retaining the advantages associated with path-velocity decomposition. We demonstrate the efficiency of the proposed method on some difficult kinodynamic planning problems, where, in particular, quasi-static methods are guaranteed to fail.

  • 4 authors
·
Sep 29, 2016

Modeling Information Blackouts in Missing Not-At-Random Time Series Data

Large-scale traffic forecasting relies on fixed sensor networks that often exhibit blackouts: contiguous intervals of missing measurements caused by detector or communication failures. These outages are typically handled under a Missing At Random (MAR) assumption, even though blackout events may correlate with unobserved traffic conditions (e.g., congestion or anomalous flow), motivating a Missing Not At Random (MNAR) treatment. We propose a latent state-space framework that jointly models (i) traffic dynamics via a linear dynamical system and (ii) sensor dropout via a Bernoulli observation channel whose probability depends on the latent traffic state. Inference uses an Extended Kalman Filter with Rauch-Tung-Striebel smoothing, and parameters are learned via an approximate EM procedure with a dedicated update for detector-specific missingness parameters. On the Seattle inductive loop detector data, introducing latent dynamics yields large gains over naive baselines, reducing blackout imputation RMSE from 7.02 (LOCF) and 5.02 (linear interpolation + seasonal naive) to 4.23 (MAR LDS), corresponding to about a 64% reduction in MSE relative to LOCF. Explicit MNAR modeling provides a consistent but smaller additional improvement on real data (imputation RMSE 4.20; 0.8% RMSE reduction relative to MAR), with similar modest gains for short-horizon post-blackout forecasts (evaluated at 1, 3, and 6 steps). In controlled synthetic experiments, the MNAR advantage increases as the true missingness dependence on latent state strengthens. Overall, temporal dynamics dominate performance, while MNAR modeling offers a principled refinement that becomes most valuable when missingness is genuinely informative.

  • 3 authors
·
Jan 5 1

On the Collapse of Generative Paths: A Criterion and Correction for Diffusion Steering

Inference-time steering enables pretrained diffusion/flow models to be adapted to new tasks without retraining. A widely used approach is the ratio-of-densities method, which defines a time-indexed target path by reweighting probability-density trajectories from multiple models with positive, or in some cases, negative exponents. This construction, however, harbors a critical and previously unformalized failure mode: Marginal Path Collapse, where intermediate densities become non-normalizable even though endpoints remain valid. Collapse arises systematically when composing heterogeneous models trained on different noise schedules or datasets, including a common setting in molecular design where de-novo, conformer, and pocket-conditioned models must be combined for tasks such as flexible-pose scaffold decoration. We provide a novel and complete solution for the problem. First, we derive a simple path existence criterion that predicts exactly when collapse occurs from noise schedules and exponents alone. Second, we introduce Adaptive path Correction with Exponents (ACE), which extends Feynman-Kac steering to time-varying exponents and guarantees a valid probability path. On a synthetic 2D benchmark and on flexible-pose scaffold decoration, ACE eliminates collapse and enables high-guidance compositional generation, improving distributional and docking metrics over constant-exponent baselines and even specialized task-specific scaffold decoration models. Our work turns ratio-of-densities steering with heterogeneous experts from an unstable heuristic into a reliable tool for controllable generation.

  • 9 authors
·
Dec 10, 2025

FMT^{x}: An Efficient and Asymptotically Optimal Extension of the Fast Marching Tree for Dynamic Replanning

Path planning in dynamic environments remains a core challenge in robotics, especially as autonomous systems are deployed in unpredictable spaces such as warehouses and public roads. While algorithms like Fast Marching Tree (FMT^{*}) offer asymptotically optimal solutions in static settings, their single-pass design prevents path revisions which are essential for real-time adaptation. On the other hand, full replanning is often too computationally expensive. This paper introduces FMT^{x}, an extension of the Fast Marching Tree algorithm that enables efficient and consistent replanning in dynamic environments. We revisit the neighbor selection rule of FMT^{*} and demonstrate that a minimal change overcomes its single-pass limitation, enabling the algorithm to update cost-to-come values upon discovering better connections without sacrificing asymptotic optimality or computational efficiency. By maintaining a cost-ordered priority queue and applying a selective update condition that uses an expanding neighbor to identify and trigger the re-evaluation of any node with a potentially suboptimal path, FMT^{x} ensures that suboptimal routes are efficiently repaired as the environment evolves. This targeted strategy preserves the inherent efficiency of FMT^{*} while enabling robust adaptation to changes in obstacle configuration. FMT^{x} is proven to recover an asymptotically optimal solution after environmental changes. Experimental results demonstrate that FMT^{x} outperforms the influential replanner RRT^{x}, reacting more swiftly to dynamic events with lower computational overhead and thus offering a more effective solution for real-time robotic navigation in unpredictable worlds.

  • 1 authors
·
Sep 10, 2025

Deep Networks Always Grok and Here is Why

Grokking, or delayed generalization, is a phenomenon where generalization in a deep neural network (DNN) occurs long after achieving near zero training error. Previous studies have reported the occurrence of grokking in specific controlled settings, such as DNNs initialized with large-norm parameters or transformers trained on algorithmic datasets. We demonstrate that grokking is actually much more widespread and materializes in a wide range of practical settings, such as training of a convolutional neural network (CNN) on CIFAR10 or a Resnet on Imagenette. We introduce the new concept of delayed robustness, whereby a DNN groks adversarial examples and becomes robust, long after interpolation and/or generalization. We develop an analytical explanation for the emergence of both delayed generalization and delayed robustness based on a new measure of the local complexity of a DNN's input-output mapping. Our local complexity measures the density of the so-called 'linear regions' (aka, spline partition regions) that tile the DNN input space, and serves as a utile progress measure for training. We provide the first evidence that for classification problems, the linear regions undergo a phase transition during training whereafter they migrate away from the training samples (making the DNN mapping smoother there) and towards the decision boundary (making the DNN mapping less smooth there). Grokking occurs post phase transition as a robust partition of the input space emerges thanks to the linearization of the DNN mapping around the training points. Website: https://bit.ly/grok-adversarial

  • 3 authors
·
Feb 23, 2024

BoundMPC: Cartesian Trajectory Planning with Error Bounds based on Model Predictive Control in the Joint Space

This work presents a novel online model-predictive trajectory planner for robotic manipulators called BoundMPC. This planner allows the collision-free following of Cartesian reference paths in the end-effector's position and orientation, including via-points, within desired asymmetric bounds of the orthogonal path error. The path parameter synchronizes the position and orientation reference paths. The decomposition of the path error into the tangential direction, describing the path progress, and the orthogonal direction, which represents the deviation from the path, is well known for the position from the path-following control in the literature. This paper extends this idea to the orientation by utilizing the Lie theory of rotations. Moreover, the orthogonal error plane is further decomposed into basis directions to define asymmetric Cartesian error bounds easily. Using piecewise linear position and orientation reference paths with via-points is computationally very efficient and allows replanning the pose trajectories during the robot's motion. This feature makes it possible to use this planner for dynamically changing environments and varying goals. The flexibility and performance of BoundMPC are experimentally demonstrated by two scenarios on a 7-DoF Kuka LBR iiwa 14 R820 robot. The first scenario shows the transfer of a larger object from a start to a goal pose through a confined space where the object must be tilted. The second scenario deals with grasping an object from a table where the grasping point changes during the robot's motion, and collisions with other obstacles in the scene must be avoided.

  • 4 authors
·
Jan 10, 2024

Video Models Reason Early: Exploiting Plan Commitment for Maze Solving

Video diffusion models exhibit emergent reasoning capabilities like solving mazes and puzzles, yet little is understood about how they reason during generation. We take a first step towards understanding this and study the internal planning dynamics of video models using 2D maze solving as a controlled testbed. Our investigations reveal two findings. Our first finding is early plan commitment: video diffusion models commit to a high-level motion plan within the first few denoising steps, after which further denoising alters visual details but not the underlying trajectory. Our second finding is that path length, not obstacle density, is the dominant predictor of maze difficulty, with a sharp failure threshold at 12 steps. This means video models can only reason over long mazes by chaining together multiple sequential generations. To demonstrate the practical benefits of our findings, we introduce Chaining with Early Planning, or ChEaP, which only spends compute on seeds with promising early plans and chains them together to tackle complex mazes. This improves accuracy from 7% to 67% on long-horizon mazes and by 2.5x overall on hard tasks in Frozen Lake and VR-Bench across Wan2.2-14B and HunyuanVideo-1.5. Our analysis reveals that current video models possess deeper reasoning capabilities than previously recognized, which can be elicited more reliably with better inference-time scaling.

Overcoming State Inertia in Full-Duplex Spoken Language Models via Activation Steering

Full-duplex spoken language models (FD-SLMs) enable seamless speech interaction by allowing models to listen and speak simultaneously, yet the internal mechanism by which they coordinate listening and speaking remains underexplored. We analyze the predictive behavior encoded in FD-SLM hidden representations and find that they exhibit stream-specific predictive patterns: during listening, they preferentially predict the incoming user stream, whereas during speaking, they preferentially predict the model output stream. Building on this observation, we show that FD-SLMs dynamically modulate their internal predictive focus between two states: a generative state aligned with model output generation and a perceptive state aligned with incoming user input. However, this modulation can lag behind abrupt changes in conversational context. During user interruptions, the model remains transiently biased toward the generative state before transitioning into the perceptive state, causing it to miss the beginning of the incoming input. We term this delayed internal transition state inertia. To quantify its downstream impact, we introduce the Zero-Buffer Benchmark (ZBB), a diagnostic benchmark for evaluating immediate interruption comprehension when user speech begins abruptly. We evaluate this setting using response correctness and initial-word occurrence rate (IWOR). Finally, we mitigate state inertia through activation steering with a perception vector, a training-free intervention with little additional computational overhead. Across multiple state-of-the-art FD-SLMs, activation steering substantially improves interruption handling; for example, on PersonaPlex, it improves correctness from 28% to 45% and IWOR from 40% to 72% without any fine-tuning.

  • 4 authors
·
Jun 8

Feature Lottery? A Bifurcation Theory of Concept Emergence

Neural networks acquire structured representations at specific moments during training, yet identifying these transitions typically relies on retrospective, label-dependent metrics. We introduce a bifurcation theory of representation dynamics to detect these moments in real time. Analyzing a passive GMM probe attached to the evolving encoder, we show the onset of structure corresponds to a supercritical pitchfork bifurcation driven by the loss Hessian. The system exhibits a theoretically predictable zero-crossing (β_c) that, compared to the network's current state (β), yields a dynamic ratio β(t)/β_c(t): a universal, label-free phase coordinate for representation dynamics, computable entirely from hidden states. We empirically validate four distinct transition regimes predicted by this coordinate across diverse settings: SAEs on language models (Pythia), SSL (CIFAR), and grokking (modular arithmetic). Crucially, under finite dissipation, macroscopic symmetry-breaking can lag the initial zero-crossing by orders of magnitude, which providing a rigorous dynamical account of the delayed escape observed in grokking. Microscopically, the bifurcation creates a shared unstable subspace, forcing collective symmetry breaking. We term this the "feature lottery" in SAE training: a feature's terminal interpretability becomes predictable remarkably early. By only 5% of training, early atom purity robustly predicts final convergence purity, with top-decile early atoms achieving over 12x the baseline purity at convergence. Beyond explaining concept emergence, β/β_c provides a practical early-warning indicator for training health, detecting the onset of usable structure, the crystallization of feature identity, and representational collapse epochs before downstream metrics react.

  • 1 authors
·
May 21

Online Packet Scheduling with Deadlines and Learning

Network routers that enforce Quality-of-Service (QoS) guarantees must decide, at every clock cycle, which expiring packet of information to transmit, even when the value of the packet is unknown until it is processed. We frame this problem as the Online Packet Scheduling with Deadlines (OPSD) problem under Partial Feedback: packets arrive at every clock cycle, with different deadlines, but the weights are only observed after execution. Under a stochastic assumption on the unknown weights, we explore different variants of the OPSD problem with bandit feedback. We establish a connection between our setting and the sleeping bandits problem, and set our learning goal to α-regret minimization. We provide algorithms with provable α-regret guarantees under different spans of slackness, distinguishing systems allowing for randomization and systems that do not. In every scenario, our algorithms achieve an α-regret upper bound of mathcal{O}left(KTright), matching the lower bound for the standard bandit setting. In the practically relevant case of 2-bounded deadline instances, where the deadline is set at most one clock cycle away from the arrival, our deterministic algorithm achieves the provably tightest possible competitive ratio. Remarkably, when the number of distinct packet types Kge 2 is finite, it is possible to break the well-established Φ= 1+sqrt{5}{2} competitive ratio barrier and attain a tighter competitive ratio θ_K ranging in [2, Φ).

  • 3 authors
·
May 29

Liquid Neural Network-based Adaptive Learning vs. Incremental Learning for Link Load Prediction amid Concept Drift due to Network Failures

Adapting to concept drift is a challenging task in machine learning, which is usually tackled using incremental learning techniques that periodically re-fit a learning model leveraging newly available data. A primary limitation of these techniques is their reliance on substantial amounts of data for retraining. The necessity of acquiring fresh data introduces temporal delays prior to retraining, potentially rendering the models inaccurate if a sudden concept drift occurs in-between two consecutive retrainings. In communication networks, such issue emerges when performing traffic forecasting following a~failure event: post-failure re-routing may induce a drastic shift in distribution and pattern of traffic data, thus requiring a timely model adaptation. In this work, we address this challenge for the problem of traffic forecasting and propose an approach that exploits adaptive learning algorithms, namely, liquid neural networks, which are capable of self-adaptation to abrupt changes in data patterns without requiring any retraining. Through extensive simulations of failure scenarios, we compare the predictive performance of our proposed approach to that of a reference method based on incremental learning. Experimental results show that our proposed approach outperforms incremental learning-based methods in situations where the shifts in traffic patterns are drastic.

  • 9 authors
·
Apr 8, 2024

Position: Early-Stage Quality Assurance in Annotation Pipelines Is More Cost-Effective Than Late-Stage Validation

This position paper argues that the machine learning community should prioritize early-stage quality assurance in annotation pipelines over the prevailing practice of late-stage validation. Data quality bottlenecks increasingly limit foundation model improvement, yet quality assurance research focuses almost exclusively on validation methods rather than validation timing. When validation occurs, not merely what methods are employed, fundamentally determines both error rates and annotation costs. This temporal neglect is puzzling given the well-established "shift-left" principle from software engineering, where empirical studies demonstrate 4--100x cost multipliers for defects detected in later stages (Boehm, 1981; Shull et al., 2002). Annotation pipelines exhibit analogous dynamics: errors caught before annotation begins cost a fraction of those discovered after review cycles complete. We propose a taxonomy of three QA trigger points, namely pre-annotation (T0), post-annotation (T1), and post-review (T2), that decompose annotation workflows into discrete validation opportunities. A parametric error-propagation model formalizes when timing affects final error rates versus only economics, making timing a measurable design variable rather than a configuration afterthought. A survey of 47 recent papers reveals that only 4% report when validation occurs, a striking gap given timing's demonstrated impact in adjacent fields. Without explicit attention to QA timing, the community risks optimizing validation methods while ignoring the structural variable that may matter most. Acting on this position requires three steps: researchers should report QA timing configurations alongside validation methods; annotation platforms should expose timing as a first-class parameter; and the community should run controlled experiments that measure stage-specific detection rates directly.

  • 11 authors
·
May 14

Image generation with shortest path diffusion

The field of image generation has made significant progress thanks to the introduction of Diffusion Models, which learn to progressively reverse a given image corruption. Recently, a few studies introduced alternative ways of corrupting images in Diffusion Models, with an emphasis on blurring. However, these studies are purely empirical and it remains unclear what is the optimal procedure for corrupting an image. In this work, we hypothesize that the optimal procedure minimizes the length of the path taken when corrupting an image towards a given final state. We propose the Fisher metric for the path length, measured in the space of probability distributions. We compute the shortest path according to this metric, and we show that it corresponds to a combination of image sharpening, rather than blurring, and noise deblurring. While the corruption was chosen arbitrarily in previous work, our Shortest Path Diffusion (SPD) determines uniquely the entire spatiotemporal structure of the corruption. We show that SPD improves on strong baselines without any hyperparameter tuning, and outperforms all previous Diffusion Models based on image blurring. Furthermore, any small deviation from the shortest path leads to worse performance, suggesting that SPD provides the optimal procedure to corrupt images. Our work sheds new light on observations made in recent works and provides a new approach to improve diffusion models on images and other types of data.

  • 8 authors
·
Jun 1, 2023

TwinRouterBench: Fast Static and Live Dynamic Evaluation for Realistic Agentic LLM Routing

LLM routing matters most in long-horizon applications such as coding agents, deep research systems, and computer-use agents, where a single user request triggers many model calls. Routing each call to the cheapest sufficient model can cut costs without sacrificing quality, yet existing router benchmarks evaluate routers only on one-shot prompts. They never expose the router-visible prefix at an intermediate agent step, never test whether a cheaper replacement preserves downstream task success, and often rely on online LLM judges at evaluation time. We introduce TwinRouterBench, a step-level routing benchmark with two tracks. The static track provides 970 router-visible prefixes from 520 instances across SWE-bench, BFCL, mtRAG, QMSum, and PinchBench, each paired with an execution-verified target tier estimated under a released downgrade-and-cascade protocol; scoring is deterministic arithmetic over tier labels, trajectory membership, and token costs, with no online evaluator-side LLM judge. The dynamic track supplies a harness that runs routers on the full 500-case SWE-bench Verified suite; in this paper we report a 100-case held-out evaluation disjoint from the static SWE supervision split. At each LLM call the router selects a concrete model from a locked pool, and success is measured by official task resolution and realized API spend. The two tracks support fast offline iteration followed by end-to-end validation under live agent execution. Code and data are available at https://github.com/CommonstackAI/TwinRouterBench.

  • 17 authors
·
May 13

The Role of Vertex Consistency in Sampling-based Algorithms for Optimal Motion Planning

Motion planning problems have been studied by both the robotics and the controls research communities for a long time, and many algorithms have been developed for their solution. Among them, incremental sampling-based motion planning algorithms, such as the Rapidly-exploring Random Trees (RRTs), and the Probabilistic Road Maps (PRMs) have become very popular recently, owing to their implementation simplicity and their advantages in handling high-dimensional problems. Although these algorithms work very well in practice, the quality of the computed solution is often not good, i.e., the solution can be far from the optimal one. A recent variation of RRT, namely the RRT* algorithm, bypasses this drawback of the traditional RRT algorithm, by ensuring asymptotic optimality as the number of samples tends to infinity. Nonetheless, the convergence rate to the optimal solution may still be slow. This paper presents a new incremental sampling-based motion planning algorithm based on Rapidly-exploring Random Graphs (RRG), denoted RRT# (RRT "sharp") which also guarantees asymptotic optimality but, in addition, it also ensures that the constructed spanning tree of the geometric graph is consistent after each iteration. In consistent trees, the vertices which have the potential to be part of the optimal solution have the minimum cost-come-value. This implies that the best possible solution is readily computed if there are some vertices in the current graph that are already in the goal region. Numerical results compare with the RRT* algorithm.

  • 2 authors
·
Apr 28, 2012

Evidence Sufficiency Under Delayed Ground Truth: Proxy Monitoring for Risk Decision Systems

Machine learning systems in fraud detection, credit scoring, and clinical risk assessment operate under delayed ground truth: outcome labels arrive days to months after the decision they evaluate. During this blind period, governance evidence degrades through mechanisms that neither drift detection methods nor governance frameworks adequately address. This paper formalizes an evidence sufficiency model with four dimensions (completeness, freshness, reliability, representativeness) and a decision-readiness gate that quantifies how label latency degrades evidence quality. The model maps three drift types to dimension-specific degradation trajectories. A complementary proxy indicator framework comprising seven measurement categories estimates sufficiency degradation without labels, with explicit coverage mapping and characterized blind spots per drift type. Evaluation on the IEEE-CIS Fraud Detection dataset (~590K transactions) with controlled drift injection shows that composite proxy monitoring detects covariate and mixed drift with 100% detection rate, while concept drift without feature change remains undetected -- consistent with the theoretical impossibility of unsupervised detection when P(X) is unchanged. Blind period simulation confirms monotone sufficiency degradation, with concept drift degrading fastest (S=0.242 at day 60 vs 0.418 for no-drift). The framework contributes a governance sufficiency monitoring instrument; its value lies in translating drift signals into auditable sufficiency assessments with characterized blind spots. Mapping sufficiency levels to governance actions requires deployment-specific calibration beyond this study's scope.

  • 1 authors
·
Apr 16

Predictive-CSM: Lightweight Fragment Security for 6LoWPAN IoT Networks

Fragmentation is a routine part of communication in 6LoWPAN-based IoT networks, designed to accommodate small frame sizes on constrained wireless links. However, this process introduces a critical vulnerability fragments are typically stored and processed before their legitimacy is confirmed, allowing attackers to exploit this gap with minimal effort. In this work, we explore a defense strategy that takes a more adaptive, behavior-aware approach to this problem. Our system, called Predictive-CSM, introduces a combination of two lightweight mechanisms. The first tracks how each node behaves over time, rewarding consistent and successful interactions while quickly penalizing suspicious or failing patterns. The second checks the integrity of packet fragments using a chained hash, allowing incomplete or manipulated sequences to be caught early, before they can occupy memory or waste processing time. We put this system to the test using a set of targeted attack simulations, including early fragment injection, replayed headers, and flooding with fake data. Across all scenarios, Predictive CSM preserved network delivery and maintained energy efficiency, even under pressure. Rather than relying on heavyweight cryptography or rigid filters, this approach allows constrained de vices to adapt their defenses in real time based on what they observe, not just what they're told. In that way, it offers a step forward for securing fragmented communication in real world IoT systems

  • 1 authors
·
Jun 2, 2025

Uncertainty Visualization of Critical Points of 2D Scalar Fields for Parametric and Nonparametric Probabilistic Models

This paper presents a novel end-to-end framework for closed-form computation and visualization of critical point uncertainty in 2D uncertain scalar fields. Critical points are fundamental topological descriptors used in the visualization and analysis of scalar fields. The uncertainty inherent in data (e.g., observational and experimental data, approximations in simulations, and compression), however, creates uncertainty regarding critical point positions. Uncertainty in critical point positions, therefore, cannot be ignored, given their impact on downstream data analysis tasks. In this work, we study uncertainty in critical points as a function of uncertainty in data modeled with probability distributions. Although Monte Carlo (MC) sampling techniques have been used in prior studies to quantify critical point uncertainty, they are often expensive and are infrequently used in production-quality visualization software. We, therefore, propose a new end-to-end framework to address these challenges that comprises a threefold contribution. First, we derive the critical point uncertainty in closed form, which is more accurate and efficient than the conventional MC sampling methods. Specifically, we provide the closed-form and semianalytical (a mix of closed-form and MC methods) solutions for parametric (e.g., uniform, Epanechnikov) and nonparametric models (e.g., histograms) with finite support. Second, we accelerate critical point probability computations using a parallel implementation with the VTK-m library, which is platform portable. Finally, we demonstrate the integration of our implementation with the ParaView software system to demonstrate near-real-time results for real datasets.

  • 8 authors
·
Jul 25, 2024

Proactive Model Adaptation Against Concept Drift for Online Time Series Forecasting

Time series forecasting always faces the challenge of concept drift, where data distributions evolve over time, leading to a decline in forecast model performance. Existing solutions are based on online learning, which continually organize recent time series observations as new training samples and update model parameters according to the forecasting feedback on recent data. However, they overlook a critical issue: obtaining ground-truth future values of each sample should be delayed until after the forecast horizon. This delay creates a temporal gap between the training samples and the test sample. Our empirical analysis reveals that the gap can introduce concept drift, causing forecast models to adapt to outdated concepts. In this paper, we present Proceed, a novel proactive model adaptation framework for online time series forecasting. Proceed first estimates the concept drift between the recently used training samples and the current test sample. It then employs an adaptation generator to efficiently translate the estimated drift into parameter adjustments, proactively adapting the model to the test sample. To enhance the generalization capability of the framework, Proceed is trained on synthetic diverse concept drifts. Extensive experiments on five real-world datasets across various forecast models demonstrate that Proceed brings more performance improvements than the state-of-the-art online learning methods, significantly facilitating forecast models' resilience against concept drifts. Code is available at https://github.com/SJTU-DMTai/OnlineTSF.

  • 2 authors
·
Dec 11, 2024

Landscaping Linear Mode Connectivity

The presence of linear paths in parameter space between two different network solutions in certain cases, i.e., linear mode connectivity (LMC), has garnered interest from both theoretical and practical fronts. There has been significant research that either practically designs algorithms catered for connecting networks by adjusting for the permutation symmetries as well as some others that more theoretically construct paths through which networks can be connected. Yet, the core reasons for the occurrence of LMC, when in fact it does occur, in the highly non-convex loss landscapes of neural networks are far from clear. In this work, we take a step towards understanding it by providing a model of how the loss landscape needs to behave topographically for LMC (or the lack thereof) to manifest. Concretely, we present a `mountainside and ridge' perspective that helps to neatly tie together different geometric features that can be spotted in the loss landscape along the training runs. We also complement this perspective by providing a theoretical analysis of the barrier height, for which we provide empirical support, and which additionally extends as a faithful predictor of layer-wise LMC. We close with a toy example that provides further intuition on how barriers arise in the first place, all in all, showcasing the larger aim of the work -- to provide a working model of the landscape and its topography for the occurrence of LMC.

  • 6 authors
·
Jun 23, 2024

Pipette: Automatic Fine-grained Large Language Model Training Configurator for Real-World Clusters

Training large language models (LLMs) is known to be challenging because of the huge computational and memory capacity requirements. To address these issues, it is common to use a cluster of GPUs with 3D parallelism, which splits a model along the data batch, pipeline stage, and intra-layer tensor dimensions. However, the use of 3D parallelism produces the additional challenge of finding the optimal number of ways on each dimension and mapping the split models onto the GPUs. Several previous studies have attempted to automatically find the optimal configuration, but many of these lacked several important aspects. For instance, the heterogeneous nature of the interconnect speeds is often ignored. While the peak bandwidths for the interconnects are usually made equal, the actual attained bandwidth varies per link in real-world clusters. Combined with the critical path modeling that does not properly consider the communication, they easily fall into sub-optimal configurations. In addition, they often fail to consider the memory requirement per GPU, often recommending solutions that could not be executed. To address these challenges, we propose Pipette, which is an automatic fine-grained LLM training configurator for real-world clusters. By devising better performance models along with the memory estimator and fine-grained individual GPU assignment, Pipette achieves faster configurations that satisfy the memory constraints. We evaluated Pipette on large clusters to show that it provides a significant speedup over the prior art. The implementation of Pipette is available at https://github.com/yimjinkyu1/date2024_pipette.

  • 7 authors
·
May 28, 2024

Sequential Gradient Coding For Straggler Mitigation

In distributed computing, slower nodes (stragglers) usually become a bottleneck. Gradient Coding (GC), introduced by Tandon et al., is an efficient technique that uses principles of error-correcting codes to distribute gradient computation in the presence of stragglers. In this paper, we consider the distributed computation of a sequence of gradients {g(1),g(2),ldots,g(J)}, where processing of each gradient g(t) starts in round-t and finishes by round-(t+T). Here Tgeq 0 denotes a delay parameter. For the GC scheme, coding is only across computing nodes and this results in a solution where T=0. On the other hand, having T>0 allows for designing schemes which exploit the temporal dimension as well. In this work, we propose two schemes that demonstrate improved performance compared to GC. Our first scheme combines GC with selective repetition of previously unfinished tasks and achieves improved straggler mitigation. In our second scheme, which constitutes our main contribution, we apply GC to a subset of the tasks and repetition for the remainder of the tasks. We then multiplex these two classes of tasks across workers and rounds in an adaptive manner, based on past straggler patterns. Using theoretical analysis, we demonstrate that our second scheme achieves significant reduction in the computational load. In our experiments, we study a practical setting of concurrently training multiple neural networks over an AWS Lambda cluster involving 256 worker nodes, where our framework naturally applies. We demonstrate that the latter scheme can yield a 16\% improvement in runtime over the baseline GC scheme, in the presence of naturally occurring, non-simulated stragglers.

  • 3 authors
·
Nov 24, 2022

WorldForge: Unlocking Emergent 3D/4D Generation in Video Diffusion Model via Training-Free Guidance

Recent video diffusion models demonstrate strong potential in spatial intelligence tasks due to their rich latent world priors. However, this potential is hindered by their limited controllability and geometric inconsistency, creating a gap between their strong priors and their practical use in 3D/4D tasks. As a result, current approaches often rely on retraining or fine-tuning, which risks degrading pretrained knowledge and incurs high computational costs. To address this, we propose WorldForge, a training-free, inference-time framework composed of three tightly coupled modules. Intra-Step Recursive Refinement introduces a recursive refinement mechanism during inference, which repeatedly optimizes network predictions within each denoising step to enable precise trajectory injection. Flow-Gated Latent Fusion leverages optical flow similarity to decouple motion from appearance in the latent space and selectively inject trajectory guidance into motion-related channels. Dual-Path Self-Corrective Guidance compares guided and unguided denoising paths to adaptively correct trajectory drift caused by noisy or misaligned structural signals. Together, these components inject fine-grained, trajectory-aligned guidance without training, achieving both accurate motion control and photorealistic content generation. Extensive experiments across diverse benchmarks validate our method's superiority in realism, trajectory consistency, and visual fidelity. This work introduces a novel plug-and-play paradigm for controllable video synthesis, offering a new perspective on leveraging generative priors for spatial intelligence.

  • 5 authors
·
Sep 18, 2025 7

Stale but Stable: Staleness-Adaptive Trust Regions for Stabilizing Asynchronous Reinforcement Learning

Asynchronous reinforcement learning improves throughput by decoupling rollout generation from optimization, but staleness is an inevitable byproduct compounded by policy lag, engine delays, and mixture-of-experts routing. From a trust-region perspective, this mismatch is critical: training-inference divergence governs approximation error in finite-horizon bounds, whereas PPO clipping only gates sampled outward updates, acting as a sampled surrogate rather than a full-policy constraint. As a result, high-staleness updates remain weakly controlled in the asynchronous regime where stale rollouts matter most. We introduce the Staleness-Adaptive Trust Region (SAT), which uses the detached sampled log-ratio as a practical staleness proxy, identifies high-mismatch tails within each batch via staleness-based kernel scaling, and contracts only the sign-selected endpoint of the nominal PPO interval. This preserves baseline behavior on ordinary tokens while enforcing more conservative updates on newly intercepted outward bands. We prove local interval containment and pointwise pessimism relative to PPO, showing how the adaptive rule reshapes update geometry under heterogeneous staleness. We evaluate SAT in a decoupled asynchronous RL setup built on Qwen3-30B-A3B-Base, using SGLang as the inference engine and Megatron for training. In this setting, SAT-GSPO w/ R3 achieves the best observed AIME24 avg@8, reaching 35.83 at lag 1 and 34.79 at lag 8, while SAT-GSPO reaches 34.17 at lag 1. Adaptive clipping and routing replay act as complementary stabilizers targeting mismatch tails and routing inconsistency, respectively. Overall, aligning clip intervals with staleness heterogeneity effectively stabilizes asynchronous RL.