The staircase calculator existed (_calc_generic_floor_item handles the
"staircase" key: volume_per_level x (structural_levels - 1)) but no item with a
"staircase" key was present in DRAWING_ITEMS_MAP, so compute_all_quantities never
called it — staircase concrete was silently absent (0) from every BOQ.
Added the "staircase_1st" item to the super-structure page. Verified on real
saved projects: G+1 -> 5.2 m3, G+2 -> 10.4 m3, single-storey -> 0 (correct). On
the training villa with a known BOQ this lands at 5.2 vs a real 6 m3 (-13%,
within +-15%).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>