Spaces:
Running
Running
Commit History
-
add all social media integrations in intergeations menu
Verified signaturea6c0967 -
Add a report in menu to take all kind of reports , based on project wise or url wise
Verified signatureda3492f -
Manual changes saved
Verified signatureca4a731 -
view project button is not working , fix it
Verified signaturedfb2cbd -
not working
Verified signaturebccc450 -
I couldnt click dashboard
Verified signature13605b0 -
Promote version 75e7c7e to main
Verified signaturePromoted commit 75e7c7e4143a64bb64856c309326a4d471379e43 to main branch6968093 -
Dash board link is not working , fix it
Verified signatureaad9107 -
Remove this fully
Verified signature75e7c7e -
Manual changes saved
Verified signatureb3efadd
-
remove workfloe section
Verified signaturebfaacb5 -
remove these blocks : Phase 2: Creation
Verified signaturePhase 3: Technical Phase 4: Amplification Phase 5: Measurement607b67c -
Promote version e39159d to main
Verified signaturePromoted commit e39159d8ad1a05b2eb7cd02a0bd00890545be989 to main branch3187bb2 -
Need to add Billing section & content calender in dashboard , In dash board no need to show phases under url , Project progress is main matter , in later sections like when selecting projects we can show the urls work progress , & when selecting the url we can show the phases as check list & show the tool do it
Verified signature7017f2e -
Manual changes saved
Verified signaturee39159d -
I understand that Phase 1 (Strategy) should be treated as project-level settings that are configured once during project creation and can be edited later in settings, while the other phases (2-5) apply to individual URLs within the project.
Verified signatureHere's the modified approach: Modified Structure: Phase 1 (Strategy) → Project-level configuration (one-time setup) Phases 2-5 → URL-level workflows (applied to each URL) Key Changes Needed: 1. Move Phase 1 to Project Settings Remove Phase 1 from the main workflow navigation Integrate Phase 1 components into project settings Make it clear this is one-time project configuration 2. Update Navigation Remove Phase 1 from workflow phase tabs Keep Phase 1 accessible via project settings or initial setup wizard 3. URL-Centric Workflow Phases 2-5 should be clearly associated with specific URLs Progress tracking per URL across phases 2-5 Implementation Plan: html <!-- Updated Workflow Navigation (remove Phase 1) --> <div class="workflow-phases"> <div class="phase-tab active" data-phase="overview">Overview</div> <div class="phase-tab" data-phase="phase2">Phase 2: Creation</div> <div class="phase-tab" data-phase="phase3">Phase 3: Technical</div> <div class="phase-tab" data-phase…315de5f -
Phase 1 is related to Project Settings , Project settings will do only in the begining of the project creation & then they can edit it in the settings , Rest of the phases are applicable for every url Under projects
Verified signaturec6a2f9b -
initial commit
Verified signature8fad3b1