bim-inspector-pro / script.js

Commit History

  1. I need more specific data. Construction timber should be divided in type ex. c24 45x195. the data presented in excel should be length in total, total amount. do this for each uniqe component

    Verified signature
    7b3f95f
  2. Alalyse all objects in model

    Verified signature
    9ef0b13

  1. Is the task to hard?

    Verified signature
    9ccf602
  2. Could you identify what the objects are and sort them in groups and take out with, hight and death. I also would like to get the total amount of M2 for each side of the object

    Verified signature
    7fa9c8e