Spaces:
Running
Running
Commit History
17 days ago
-
v2.45: port dual ingest and probed canvas fixes
Arena.ai Agent7ea6aba
19 days ago
-
relay-v2.40-avfill-splice: apply On-validated A/V fill splice fix fleet-wide
Verified signatureOperator-approved fleet rollout of the On trial: sequence headers stamped 0 no longer consume the splice bias, bridge operations are serialized, fill writes are deadline-bounded, and the watchdog no longer shields a stalled/inflated fill.a9631e4
26 days ago
-
Renew stdin write deadline while gap-filling (v2.36-fill-renewal)
Verified signature30b1d21 -
Post-fill/reattach seam credit for write deadline (v2.35-seam-credit)
Verified signatureee814e6 -
Keyframe-gated resume + fill-credit write deadline (v2.34-keyframe-gate)
Verified signaturec201b90 -
Persistent room format lock + fill/swap-aware write deadline (v2.33-format-lock-fillguard)
Verified signature9d0318c -
Exact copy of Reoo88/On @ 826bfe0 (relay-v2.32-gap-filler)
Verified signaturece0ef24