Spaces:
Sleeping
Sleeping
Download data/extracted/CS44.json from UWRFR/UWaterlooRFRChatBot: direct link, hf CLI and curl.
- Browser
- Download file 38.3 kB
-
https://huggingface.co/spaces/UWRFR/UWaterlooRFRChatBot/resolve/main/data/extracted/CS44.json
- Command line
-
hf download hf://spaces/UWRFR/UWaterlooRFRChatBot/data/extracted/CS44.json
-
curl -L -o CS44.json https://huggingface.co/spaces/UWRFR/UWaterlooRFRChatBot/resolve/main/data/extracted/CS44.json
38.3 kB
| [ | |
| { | |
| "case_id": "CS44", | |
| "chunk_index": 0, | |
| "section": "overview", | |
| "location": "Iloilo, Western Visayas Region", | |
| "country": "Philippines", | |
| "country_normalized": "Philippines", | |
| "continent": "Asia", | |
| "admin_area": "Western Visayas Region", | |
| "source": "Pipeline Ver2 β Iloilo", | |
| "source_links": [ | |
| { | |
| "title": "See, J., & Wilmsen, B. (2020). Just adaptation? Generating new vulnerabilities and shaping adaptive capacities through the politics of climate-related resettlement in a Philippine coastal city. Global Environmental Change, 65, 102188. https://doi.org/10.1016/j.gloenvcha.2020.102188", | |
| "doi": "10.1016/j.gloenvcha.2020.102188", | |
| "url": "https://doi.org/10.1016/j.gloenvcha.2020.102188" | |
| }, | |
| { | |
| "title": "See, J., Wilmsen, B., & Porio, E. (2023). Resettler input and equity outcomes in climate-related resettlement in Iloilo, Philippines. Resettlement with People First, 134-157. https://doi.org/10.4324/9781003432692-8", | |
| "doi": "10.4324/9781003432692-8", | |
| "url": "https://doi.org/10.4324/9781003432692-8" | |
| }, | |
| { | |
| "title": "Gongadze, S., & Maassen, A. (2023, January 11). In Iloilo City, Philippines, an Inclusive Housing Program Protects Vulnerable Communities from Flood Risks. World Resources Institute Insights.", | |
| "url": "https://www.wri.org/insights/iloilo-city-philippines-housing-flood-protection" | |
| } | |
| ], | |
| "text": "Case study: Iloilo (Iloilo, Western Visayas Region, Philippines)\nSection: CASE STUDY OVERVIEW\n\n**Case Name and Location:** Iloilo Flood Control Project (IFCP) Resettlement β Iloilo City, Western Visayas, Philippines (Global South)\n\n**Hazard(s):** Riverine and pluvial flooding, with typhoons serving as acute triggers and climate change providing broader adaptation context (including sea-level rise and coastal flooding risk). [See et al., 2023; See and Wilmsen, 2020; WRI, 2023]\n\n**Type of Retreat:** The IFCP is analyzed in the academic literature as climate-induced displacement and resettlement (CIDR). Mainstream IFCP relocation was largely involuntary β relocatees did not have the option to stay in situ because the land was claimed by the government as flood-prone. A parallel, community-driven housing initiative led by the Homeless People's Federation of the Philippines Inc. (HPFPI) operated alongside the IFCP and involved a more participatory, community-organized process. [See et al., 2023; See and Wilmsen, 2020]\n\n**Scale:** Approximately 3,500 households were identified for resettlement as part of the IFCP, the majority of whom lived below the poverty line. [See et al., 2023] The primary resettlement site is a 16.2-hectare parcel in San Isidro. [See et al., 2023; WRI, 2023] The HPFPI-led participatory housing component has supported approximately 1,250 households across 23 city sites. [WRI, 2023] By 2009, an estimated 9,700 households were living in informal settlements citywide with no formal tenure. [WRI, 2023] Iloilo City has a population of approximately 500,000. [See and Wilmsen, 2020]\n\n**Key Actors:** The Department of Public Works and Highways (DPWH); Iloilo City government (including the Iloilo City Urban Poor Affairs Office/ICUPAO, City Social Welfare and Development Office, City Engineers' Office, City Planning and Development, and City Health Office); the National Housing Authority; four NGOs funded by development agencies based in Europe and the United States (referred to as NGOs A, B, C, and D); the Homeless People's Federation of the Philippines Inc. (HPFPI); the Iloilo City Urban Poor Network (ICUPN); the Asian Development Bank (ADB); and the Japan International Cooperation Agency (JICA). [See et al., 2023; WRI, 2023]\n\n**Timeline:** The IFCP began in 2002. [See et al., 2023] The Resettlement Action Plan (RAP) was drafted by DPWH in 2005. [See et al., 2023; DPWH, 2005] Mayor Jerry P. TreΓ±as was elected in 2001 and committed early to community engagement and government-banked land for resettlement. [WRI, 2023] HPFPI co-founded the Iloilo City Urban Poor Network (ICUPN) in 2005, and conducted citywide surveys from 2007 onward. [WRI, 2023] A pivotal event was Typhoon Fengshen in 2008, which flooded 152 of Iloilo's 180 barangays and submerged about 80% of the city, displacing thousands of families and increasing the urgency of resettlement. [See and Wilmsen, 2020; WRI, 2023] Fieldwork assessing outcomes was conducted in 2018. [See et al., 2023] The national government subsequently indicated its intention to use Iloilo's resettlement program as a model for other adaptation projects in the Philippines. [See et al., 2023]\n\n**Key Outcomes:** Commentators and officials have described the IFCP as a participatory success story, and the national government has cited it as a model for adaptation projects in the Philippines. [See et al., 2023; See and Wilmsen, 2020] However, detailed empirical research conducted in 2018 reveals significant procedural and distributive inequities. Resettlement outcomes varied sharply depending on which NGO managed the relocation. Households managed by NGO A β selected partly on the basis of higher incomes and capacity to service housing loans, and, according to interviewees, partly through political connections β experienced better housing quality, improved basic services, and income growth. By contrast, households managed by NGOs B, C, and D received free but inferior prefabricated housing, inadequate water and sanitation, and minimal post-resettlement support. Post-resettlement income inequality worsened. The IFCP was guided by an RAP that incorporated several international safeguard elements, though important best-practice features were missing or weakly implemented. [See et al., 2023; See and Wilmsen, 2020] The HPFPI-led community savings and housing approach generated better participatory and livelihood outcomes for its participants. [See et al., 2023; WRI, 2023]\n\n---\n\n**Narrative Summary**\n\nIloilo City is a low-lying urban centre of roughly 500,000 people on Panay Island in the Philippines. Traversed by three major rivers and situated only 2.6 metres above sea level on a flat alluvial plain, the city faces chronic and severe flooding. [See et al., 2023; See and Wilmsen, 2020] Beginning in 2002, the Iloilo Flood Control Project was launched as a large infrastructure initiative designed to protect the city against floods of up to a one-in-twenty-year return period. [See et al., 2023] A central component of this project required the resettlement of approximately 3,500 low-income households living along the waterways β the majority below the poverty line β to a 16.2-hectare site at San Isidro. [See et al., 2023] The urgency of action was sharpened in 2008 when Typhoon Fengshen flooded 152 of Iloilo's 180 barangays and submerged about 80% of the city, displacing thousands of families. [See and Wilmsen, 2020; WRI, 2023] Climate change, including rising sea levels and increasing coastal flooding risk, provides the broader adaptation context for the project, though the IFCP itself was primarily centered on addressing flood risk from the city's waterways and typhoon events. [See et al., 2023]\n\nThe IFCP resettlement was formally guided by a Resettlement Action Plan (RAP) developed by DPWH, designed to comply with ADB and World Bank social safeguard standards. [See et al., 2023] Four NGOs funded by development agencies based in Europe and the United States were engaged to manage housing construction and relocation. [See et al., 2023] In parallel, the Homeless People's Federation of the Philippines (HPFPI) developed a community-driven approach, organizing savings groups, conducting citywide surveys, and working with city government to develop a broader Participatory Housing and Urban Development program across 23 city sites. [WRI, 2023] The election of Mayor Jerry P. TreΓ±as in 2001 was a turning point: as early as 2002, the city committed to purchasing land for within-city relocations and involving urban poor communities in site selection and planning. [WRI, 2023]\n\nDespite the project's positive reputation, empirical research conducted in 2018 reveals a more troubled picture. The IFCP was guided by an RAP that incorporated several international safeguard elements, though important best-practice features were missing or weakly implemented β including no options assessment, no distributional analysis, no independent review panels, and no performance bonds. [See et al., 2023] Participation in decision-making was uneven: households managed by NGO A, which required loan repayment capacity and offered training, reported far greater involvement in planning and experienced significantly better housing quality, services, and income growth. Households managed by NGOs B, C, and D received free but inferior prefabricated housing and minimal post-resettlement support. Interviewees reported political interference, including requests to admit non-eligible beneficiaries into NGO A's program. [See et al., 2023] The result was that pre-existing socioeconomic inequalities were replicated and often deepened by the resettlement process, despite its stated commitment to equitable outcomes. The HPFPI's complementary community-led work β including community savings schemes, innovative financing, and collaborative governance β demonstrates that more participatory and equitable outcomes are achievable when communities are genuinely empowered. [See et al., 2023; WRI, 2023]\n\n---" | |
| }, | |
| { | |
| "case_id": "CS44", | |
| "chunk_index": 1, | |
| "section": "coding_questions", | |
| "location": "Iloilo, Western Visayas Region", | |
| "country": "Philippines", | |
| "country_normalized": "Philippines", | |
| "continent": "Asia", | |
| "admin_area": "Western Visayas Region", | |
| "source": "Pipeline Ver2 β Iloilo", | |
| "source_links": [ | |
| { | |
| "title": "See, J., & Wilmsen, B. (2020). Just adaptation? Generating new vulnerabilities and shaping adaptive capacities through the politics of climate-related resettlement in a Philippine coastal city. Global Environmental Change, 65, 102188. https://doi.org/10.1016/j.gloenvcha.2020.102188", | |
| "doi": "10.1016/j.gloenvcha.2020.102188", | |
| "url": "https://doi.org/10.1016/j.gloenvcha.2020.102188" | |
| }, | |
| { | |
| "title": "See, J., Wilmsen, B., & Porio, E. (2023). Resettler input and equity outcomes in climate-related resettlement in Iloilo, Philippines. Resettlement with People First, 134-157. https://doi.org/10.4324/9781003432692-8", | |
| "doi": "10.4324/9781003432692-8", | |
| "url": "https://doi.org/10.4324/9781003432692-8" | |
| }, | |
| { | |
| "title": "Gongadze, S., & Maassen, A. (2023, January 11). In Iloilo City, Philippines, an Inclusive Housing Program Protects Vulnerable Communities from Flood Risks. World Resources Institute Insights.", | |
| "url": "https://www.wri.org/insights/iloilo-city-philippines-housing-flood-protection" | |
| } | |
| ], | |
| "text": "Case study: Iloilo (Iloilo, Western Visayas Region, Philippines)\nSection: CODING QUESTIONS\n\n---\n\n### Is there any evidence of a proactive or reactive trigger in the MR decision process? (Reactive/Proactive)\n\n**Answer:** Both reactive and proactive elements are present. The primary trigger is **reactive**, with **proactive** planning dimensions added subsequently.\n\n**Narrative:** The IFCP originated in 2002 as a flood-control infrastructure project β constituting a planned response to recurring flooding and suggesting some proactive intent. [See et al., 2023] However, the urgency and scale of resettlement were significantly shaped by reactive factors. Typhoon Fengshen in 2008 flooded 152 of Iloilo's 180 barangays and submerged about 80% of the city, dramatically accelerating the resettlement imperative. [See and Wilmsen, 2020; WRI, 2023] Earlier phases of land reclamation had also involved outright forced evictions β a reactive, infrastructure-first response rather than advance community planning. [WRI, 2023] The RAP (2005) and its participatory framework gave the project a proactive institutional structure, as did the city's early purchase of a 16.2-hectare resettlement parcel in 2002. [WRI, 2023] The community-led HPFPI surveys from 2007 and the formation of ICUPN in 2005 represent genuinely proactive grassroots organizing, partly in response to prior forced evictions. [WRI, 2023] **Both categories apply**, with reactive triggers predominating in determining timing and scale.\n\n---\n\n### Date, Number of households affected, Number of population affected, Total funding\n\n**Answer:**\n- **IFCP commenced:** 2002 [See et al., 2023]\n- **RAP published:** 2005 [See et al., 2023; DPWH, 2005]\n- **ICUPN co-founded by HPFPI:** 2005 [WRI, 2023]\n- **HPFPI citywide surveys:** 2007 onward [WRI, 2023]\n- **Key acute event:** Typhoon Fengshen, 2008 [See and Wilmsen, 2020; WRI, 2023]\n- **Fieldwork/outcome assessment:** 2018 [See et al., 2023]\n- **Households identified for resettlement (IFCP):** Approximately 3,500 households [See et al., 2023]\n- **HPFPI-supported households:** Approximately 1,250 households across 23 sites [WRI, 2023]\n- **Estimated informal settlers citywide (2009):** 9,700 households [WRI, 2023]\n- **Population:** Iloilo City approximately 500,000; no specific figure for displaced population is provided in the reviewed sources\n- **Total funding:** Not specified in reviewed sources. Funding came from JICA (Japanese ODA loan, referenced as PH-P230, for the broader flood control project), ADB and World Bank (social safeguard compliance frameworks), and development agencies based in Europe and the United States (funding the four NGOs). The JICA ex-post evaluation is referenced in the sources but not included as a full document in this review. Individual project costs are not reported in the reviewed sources.\n\n**Uncertainty:** Total funding figures are not provided in the reviewed sources.\n\n---\n\n### What is the occurrence of the hazard(s) considered in the MR decision process? (Single Hazard/Multiple Hazards)\n\n**Answer:** **Multiple Hazards**\n\n**Narrative:** The primary hazard is riverine and pluvial flooding, driven by Iloilo City's location on a flat alluvial plain traversed by three major rivers. [See et al., 2023; See and Wilmsen, 2020] Typhoons are an additional hazard, with Typhoon Fengshen (2008) identified as a key triggering event combining typhoon-driven rainfall and riverine flooding. [See and Wilmsen, 2020; WRI, 2023] Climate change, including sea-level rise and increasing coastal flooding risk, is cited as a broader contextual driver. [See et al., 2023; WRI, 2023] The Philippines more broadly faces frequent typhoons, floods, droughts, and earthquakes, though the IFCP specifically targets flood-related risk. [See and Wilmsen, 2020] **Multiple hazards** (riverine flooding, pluvial flooding, typhoon-driven flooding) are confirmed as directly relevant to the IFCP resettlement decision.\n\n---\n\n### What is the origin of the hazards considered in the MR decision process? (Technological Hazard/Natural Hazard/Climate Change)\n\n**Answer:** **Climate change** (primary framing for the broader project context); **Natural hazard** (for the immediate flood and typhoon events)\n\n**Narrative:** The sources frame the IFCP explicitly as a climate-induced displacement and resettlement (CIDR) project, situating it within the broader context of climate change adaptation. [See et al., 2023; See and Wilmsen, 2020] Sea-level rise, rising temperatures, and coastal flooding are cited as climate change impacts driving resettlement needs globally and in the Philippines. [See et al., 2023] At the same time, the immediate triggering hazards β riverine flooding and typhoons β are natural in origin. The codebook identifies \"Climate change\" as the appropriate origin code when hazards are driven by climate change (e.g., flooding due to sea-level rise, shorter return periods). Given the explicit climate-change framing in the sources, **Climate change** is the primary origin code, with **Natural hazard** applicable to the acute typhoon and flooding events. No technological hazards are identified.\n\n---\n\n### Was this hazard considered in the MR decision process?\n\n| Hazard Type | Considered? | Notes |\n|---|---|---|\n| Riverine/Pluvial Flooding | β Yes | Primary driver; the IFCP was designed to protect against the 1-in-20-year flood [See et al., 2023] |\n| Hurricane (Typhoon) | β Yes | Typhoon Fengshen (2008) was a key triggering event; typhoons are cited throughout as a chronic hazard [See and Wilmsen, 2020; WRI, 2023] |\n| Coastal Flooding/Erosion | β Partially | Sea-level rise and coastal flooding are cited as broader climate change risks providing context [See et al., 2023; WRI, 2023]; not a primary driver of the IFCP resettlement decision itself |\n| Lake Flooding/Erosion | β Not identified | |\n| Wildfire | β Not identified | |\n| Volcano | β Not identified | |\n| Land Subsidence | β Not identified | |\n| Landslide/Debris Flow | β Not identified | |\n| Earthquake | β Not identified | |\n| Tsunami | β Not identified | |\n| Other | N/A | |\n\n**Note:** Storm surge is not explicitly mentioned in the reviewed sources in connection with the IFCP or Typhoon Fengshen. Sources describe flooding and submergence of barangays, not storm surge specifically. This distinction was flagged in the audit and has been applied here.\n\n---\n\n### What was the geographic scale of the MR project? (Individual homes, A few streets, Neighbourhood, Entire community, Sub-watershed, Watershed region)\n\n**Answer:** **Neighbourhood** and **Entire community** (multiple informal settlements distributed across the city)\n\n**Narrative:** The IFCP resettlement targeted approximately 3,500 households across multiple informal settlements distributed along Iloilo City's waterways. [See et al., 2023] Households were relocated primarily to the 16.2-hectare site in San Isidro, with the HPFPI program expanding across 23 separate city sites. [See et al., 2023; WRI, 2023] This constitutes resettlement at the neighbourhood/settlement scale but operating city-wide across multiple sites β it is not a single-neighbourhood intervention. \"Entire community\" is appropriate insofar as entire informal waterway settlements were relocated. The scale substantially exceeds \"a few streets\" or \"individual homes.\" Sub-watershed is not used as an explicit planning unit in the reviewed sources.\n\n---\n\n### Who or what was retreated? (Individuals, Groups/Neighbourhoods, Communities, Critical infrastructure, Hazard protection structures, Industrial assets)\n\n**Answer:** **Groups/Neighbourhoods** and **Communities**\n\n**Narrative:** The resettled populations were informal settler communities living along waterways, organized as urban poor communities with community organizations (HPFPI, ICUPN, homeowners' associations). [See et al., 2023; WRI, 2023] Resettlement occurred at the group/neighbourhood level, with households relocated as part of NGO-managed groups to shared resettlement sites. [See et al., 2023] The WRI source describes a collective process in which community organizations such as HPFPI selected priority households for new housing. [WRI, 2023] No critical infrastructure, hazard protection structures, or industrial assets were the subject of retreat in the reviewed sources. The IFCP itself constructed flood-protection infrastructure (embankments, drainage) as part of the broader project, but this concerns hazard protection rather than the retreat of infrastructure or people.\n\n---\n\n### Other notes\n\nThe IFCP is explicitly described as \"climate-induced displacement and resettlement\" (CIDR) in the academic literature. [See et al., 2023; See and Wilmsen, 2020] The Philippine government and local authorities use the term \"resettlement.\" [See et al., 2023] The case straddles development-induced displacement (clearing land for flood-control infrastructure) and climate-related resettlement (reducing flood exposure for vulnerable communities). This dual character is an important contextual nuance that the sources themselves highlight.\n\n---" | |
| }, | |
| { | |
| "case_id": "CS44", | |
| "chunk_index": 2, | |
| "section": "institutional_environment", | |
| "location": "Iloilo, Western Visayas Region", | |
| "country": "Philippines", | |
| "country_normalized": "Philippines", | |
| "continent": "Asia", | |
| "admin_area": "Western Visayas Region", | |
| "source": "Pipeline Ver2 β Iloilo", | |
| "source_links": [ | |
| { | |
| "title": "See, J., & Wilmsen, B. (2020). Just adaptation? Generating new vulnerabilities and shaping adaptive capacities through the politics of climate-related resettlement in a Philippine coastal city. Global Environmental Change, 65, 102188. https://doi.org/10.1016/j.gloenvcha.2020.102188", | |
| "doi": "10.1016/j.gloenvcha.2020.102188", | |
| "url": "https://doi.org/10.1016/j.gloenvcha.2020.102188" | |
| }, | |
| { | |
| "title": "See, J., Wilmsen, B., & Porio, E. (2023). Resettler input and equity outcomes in climate-related resettlement in Iloilo, Philippines. Resettlement with People First, 134-157. https://doi.org/10.4324/9781003432692-8", | |
| "doi": "10.4324/9781003432692-8", | |
| "url": "https://doi.org/10.4324/9781003432692-8" | |
| }, | |
| { | |
| "title": "Gongadze, S., & Maassen, A. (2023, January 11). In Iloilo City, Philippines, an Inclusive Housing Program Protects Vulnerable Communities from Flood Risks. World Resources Institute Insights.", | |
| "url": "https://www.wri.org/insights/iloilo-city-philippines-housing-flood-protection" | |
| } | |
| ], | |
| "text": "Case study: Iloilo (Iloilo, Western Visayas Region, Philippines)\nSection: INSTITUTIONAL ENVIRONMENT\n\n---\n\n### What is the focus or scope of the MR project? (Individual buyout/retreat, Community buyout/retreat, Leasebacks/easements/buffers, Other acquisition tools, Managed realignment of infrastructure)\n\n**Answer:** **Community buyout/retreat** (primary)\n\n**Narrative:** The IFCP resettlement is a collective relocation of multiple informal settler communities through coordinated planning involving government, NGOs, and community organizations β consistent with \"community buyout/retreat.\" [See et al., 2023; WRI, 2023] The city government acquired land (the 16.2-hectare San Isidro site and eventually 23 city-wide locations) for resettlement purposes. [WRI, 2023] The resettlement was necessitated partly by the construction of flood-control infrastructure along waterways where communities lived, but the people-movement component is correctly coded as community buyout/retreat.\n\n**Why \"Managed realignment of infrastructure\" was not selected:** The codebook defines managed realignment of infrastructure as \"relocation of infrastructure only and includes roads, dams/dikes, buildings, etc. without the movement of people.\" This case centrally involves the movement of people, not infrastructure relocation. The flood-control infrastructure (embankments, drainage) was newly constructed, not relocated. This coding correction addresses a major error identified in the audit.\n\nIndividual buyout/retreat is not applicable β compensation was not a market-value property purchase but rather a resettlement package. Leasebacks/easements are not mentioned in the reviewed sources.\n\n---\n\n### What legal constraints or requirements were identified during the MR decision process? Are there any legal frameworks or regulations that guide the MR decision process?\n\n**Answer:** **Relevant regulations/acts**, **Land acquisition**, **Retreat land development**, **Compliance & enforcement**, **Legal authority over retreat**\n\n**Narrative:**\n- **Relevant regulations/acts:** The Urban Development and Housing Act of 1992 (Republic Act 7279) is the key legislation. [See et al., 2023; See and Wilmsen, 2020] It mandates resettlement of people from flood-prone areas (estuaries, riverbanks, shorelines) and defines eligibility criteria for state-sponsored resettlement (Filipino citizen, underprivileged/homeless, no real property ownership, not a professional squatter). This act both enables and constrains resettlement β creating a legal basis while also defining who can access benefits. [See et al., 2023]\n- **Land acquisition:** The city government purchased a 16.2-hectare parcel for within-city relocations, and government-banked land eventually included 23 sites throughout Iloilo City. [WRI, 2023] HPFPI also independently acquired a foreclosed 7,000-square-metre parcel before government land became available. [WRI, 2023]\n- **Retreat land development:** NGOs constructed housing on government-acquired land; the RAP prescribed the legal framework for relocation operations. [See et al., 2023]\n- **Compliance & enforcement:** Section 14 of the RAP established a Resettlement Monitoring Plan with feedback mechanisms and a Resettlement Completion Report requirement. [See et al., 2023] NGO donors conducted semi-annual monitoring visits. However, no independent review panels, performance bonds, trust funds, or integrity pacts were included β a noted gap. [See et al., 2023]\n- **Legal authority over retreat:** The DPWH held authority over the broader IFCP; the city government managed the resettlement component in coordination with national agencies. [See et al., 2023]\n- **ADB and World Bank social safeguard policies:** The RAP complied with these frameworks as international compliance references, though the World Bank is not identified as a funder of the project. [See et al., 2023]\n- **Litigation:** No evidence found in reviewed sources.\n\n**Note on coding corrections from audit:** \"Title(s) transfer\" has been removed β no source shows title transfer mechanisms or ownership transfer as a legal issue. \"Home acquisition\" has been removed β the case concerns state acquisition of relocation land, not purchase of private homes for retreat; \"Land acquisition\" is the appropriate code. These corrections address issues flagged in the audit.\n\n---\n\n### What were the funding sources for the MR project? (Local/Municipal, Provincial/State, Federal, Multiple funders, International aid, Individual, NGOs, Lenders, Insurance)\n\n**Answer:** **Multiple funders**: **Federal**, **Local/Municipal**, **International aid**, **NGOs**, **Lenders** (individual housing loans)\n\n**Narrative:**\n- **Federal:** DPWH (national government) administered the IFCP and developed the RAP. [See et al., 2023] JICA provided ODA loan financing for the broader flood control project (Japanese ODA Loan PH-P230). [See et al., 2023] The National Housing Authority is also a national-level actor.\n- **Local/Municipal:** Iloilo City government purchased land parcels for resettlement sites and contributed organizational capacity. [WRI, 2023]\n- **International aid:** JICA (Japan) financed the broader project. Development agencies based in Europe and the United States funded the four NGOs. [See et al., 2023] ADB and World Bank provided social safeguard compliance frameworks but are not identified as funders of the resettlement component in the reviewed sources.\n- **NGOs:** The four NGOs (A, B, C, D) mobilized their own donor funding to construct housing. [See et al., 2023]\n- **Lenders/Individual:** NGO A provided low-interest housing loans (Php 70,000β150,000 / US$1,400β3,000 at 3β6% interest) to households capable of servicing them. [See et al., 2023] HPFPI established community savings groups and provided community-managed loans for land acquisition and construction. [WRI, 2023]\n- **Insurance:** No evidence found in reviewed sources.\n- **Provincial/State:** No specific evidence of provincial-level funding in reviewed sources.\n\n**Note:** The audit flagged that World Bank should not be coded as a funder, as it appears only as a safeguard reference. This correction has been applied.\n\n---\n\n### What was considered to maintain (or improve) the tax base in the MR decision process?\n\n**Answer:** **New housing for BO recipients**, **Livelihoods supports**\n\n**Narrative:** The RAP incorporated the principle of \"Resettlement with Development\" (RwD), aiming to restore and improve livelihoods, not merely relocate households. [See et al., 2023] New housing was constructed at resettlement sites. [See et al., 2023] NGO A's program included community savings groups that evolved into small home-based businesses (sari-sari stores, internet cafΓ©s, small eateries), representing livelihood support. [See et al., 2023] HPFPI's work established more than 560 collective savings groups across Iloilo City. [WRI, 2023]\n\n**Important caveat:** The reviewed sources do not explicitly discuss tax base maintenance as a planning objective. These codes are inferred from livelihood and housing provisions described in the sources, not from explicit tax-base planning language. No evidence of new industry attraction or explicit tax-base retention strategies is found in the reviewed sources.\n\n---\n\n### What level/type of compensation mechanisms were considered in the MR decision process?\n\n**Answer:** **Free supports and services** (for NGOs B, C, D); **Other** (housing loans and training for NGO A; monetary assistance for dismantling/transport/medical/food per the RAP Entitlement Matrix)\n\n**Narrative:**\n- **Free supports and services:** NGOs B, C, and D provided free prefabricated houses in exchange for \"sweat equity\" in construction. [See et al., 2023]\n- **Other β housing loans:** NGO A provided low-interest housing loans (Php 70,000β150,000) enabling households to purchase construction materials and build their own homes, with training support throughout. [See et al., 2023]\n- **Other β monetary assistance:** The RAP's Entitlement Matrix provided monetary assistance to displaced households for house dismantling, transport, medical services, and food during the move. [See et al., 2023]\n- **Other β non-monetary benefits:** Improved housing infrastructure, increased livelihood opportunities, improved access to electricity, water, health, and solid waste services, and inclusion in community rebuilding programmes. [See et al., 2023]\n- **Market value / Tax value / Post-disaster value:** Not applicable β residents were informal settlers without formal land tenure; market-value property compensation was not relevant or documented. [See et al., 2023]\n\n**Note on coding correction from audit:** \"Additional incentives, bonuses, and top-ups\" has been removed. The audit correctly identified that NGO A provided loans and training, not bonuses or top-up incentives in the codebook sense. The appropriate codes are \"Free supports and services\" for NGOs B/C/D and \"Other\" for loans and monetary assistance.\n\n---" | |
| }, | |
| { | |
| "case_id": "CS44", | |
| "chunk_index": 3, | |
| "section": "planning_processes", | |
| "location": "Iloilo, Western Visayas Region", | |
| "country": "Philippines", | |
| "country_normalized": "Philippines", | |
| "continent": "Asia", | |
| "admin_area": "Western Visayas Region", | |
| "source": "Pipeline Ver2 β Iloilo", | |
| "source_links": [ | |
| { | |
| "title": "See, J., & Wilmsen, B. (2020). Just adaptation? Generating new vulnerabilities and shaping adaptive capacities through the politics of climate-related resettlement in a Philippine coastal city. Global Environmental Change, 65, 102188. https://doi.org/10.1016/j.gloenvcha.2020.102188", | |
| "doi": "10.1016/j.gloenvcha.2020.102188", | |
| "url": "https://doi.org/10.1016/j.gloenvcha.2020.102188" | |
| }, | |
| { | |
| "title": "See, J., Wilmsen, B., & Porio, E. (2023). Resettler input and equity outcomes in climate-related resettlement in Iloilo, Philippines. Resettlement with People First, 134-157. https://doi.org/10.4324/9781003432692-8", | |
| "doi": "10.4324/9781003432692-8", | |
| "url": "https://doi.org/10.4324/9781003432692-8" | |
| }, | |
| { | |
| "title": "Gongadze, S., & Maassen, A. (2023, January 11). In Iloilo City, Philippines, an Inclusive Housing Program Protects Vulnerable Communities from Flood Risks. World Resources Institute Insights.", | |
| "url": "https://www.wri.org/insights/iloilo-city-philippines-housing-flood-protection" | |
| } | |
| ], | |
| "text": "Case study: Iloilo (Iloilo, Western Visayas Region, Philippines)\nSection: PLANNING PROCESSES\n\n---\n\n### What is the time horizon considered in the MR decision process?\n\n**Answer:** **Pre-retreat planning**, **Immediate risks (1β5 years)**, **Anticipated future risks (10β100 years)**, **Post-retreat follow-up**\n\n**Narrative:**\n- **Pre-retreat planning:** The RAP (2005) constitutes formal pre-retreat planning, including stakeholder analysis, socioeconomic surveys, entitlement matrices, and monitoring frameworks. [See et al., 2023]\n- **Immediate risks (1β5 years):** The IFCP resettlement addressed existing flood exposure for communities already living in danger β the risk was present and recurring, not merely anticipated. Typhoon Fengshen (2008) confirmed the immediacy. [See and Wilmsen, 2020; WRI, 2023]\n- **Anticipated future risks (10β100 years):** Climate change projections (sea-level rise, coastal flooding increase) are cited as long-term justifications for resettlement, situating the project within a climate adaptation framing. [See et al., 2023; WRI, 2023]\n- **Post-retreat follow-up:** Section 14 of the RAP included a Resettlement Monitoring Plan with feedback mechanisms and a completion report requirement. [See et al., 2023] NGO donors conducted semi-annual monitoring visits. [See et al., 2023] However, post-retreat follow-up was highly inconsistent across NGOs β NGOs B, C, and D provided minimal ongoing support after handover. [See et al., 2023]\n- **Emerging risks (5β10 years):** Not explicitly distinguished as a planning horizon in the reviewed sources.\n\n---\n\n### What planning elements were considered in the MR decision process?\n\n**Answer:** **Top-down**, **Participatory/collaborative** (stated intent; unevenly implemented), **Multi-sectoral**, **Bottom-up** (HPFPI parallel initiative), **Degree of transparency** (partial), **Coordination with other sectors and jurisdictions**, **Multi-stage retreat** (program expanded over years and sites)\n\n**Narrative:**\n- **Top-down:** The IFCP was initiated by national government (DPWH) and implemented with the city government β a state-led infrastructure and resettlement program. [See et al., 2023]\n- **Participatory/collaborative:** The RAP prescribed participatory processes (community consultations, stakeholder validation, co-creation of procedures). [See et al., 2023] In practice, participation was uneven β NGO A achieved more genuine participatory planning while NGOs B, C, and D offered mostly information dissemination. [See et al., 2023]\n- **Bottom-up:** The HPFPI and ICUPN represent genuine community-led organizing, conducting citywide surveys, developing community savings programs, and lobbying government β a true bottom-up dimension running alongside the state-led IFCP. [WRI, 2023]\n- **Multi-sectoral:** Multiple city government departments, national agencies, NGOs, and development banks were coordinated through the RAP framework. [See et al., 2023]\n- **Degree of transparency:** The RAP was publicly documented and published by DPWH. [See et al., 2023] However, interviewees reported political interference in beneficiary selection that undermined transparency in practice. [See et al., 2023]\n- **Coordination with other sectors:** The RAP involved ICUPAO, City Social Welfare and Development Office, City Engineers' Office, City Planning, City Health Office, National Housing Authority, Philippine National Police, DSWD, and others. [See et al., 2023]\n- **Multi-stage retreat:** The program expanded over years and across 23 sites throughout Iloilo City, with phased implementation rather than a single simultaneous move. [WRI, 2023] While individual household moves may have been single events, the broader program was multi-phase in nature.\n- **Single-stage retreat:** Not coded; given the multi-site and multi-year expansion documented in the sources, a single-stage characterization would overstate the coherence of implementation.\n- **Adaptive management:** Limited evidence for the IFCP. The HPFPI adapted its approach over time based on experience, [WRI, 2023] but the IFCP itself does not demonstrate explicit adaptive management per the reviewed sources.\n- **Multi-criteria decision analysis:** Not evidenced; the RAP did not include MCDA. [See et al., 2023]\n- **Cost-benefit analysis:** Not explicitly applied; the RAP focused on impact and loss inventories rather than comprehensive CBA. [See et al., 2023]\n- **Public-private partnerships:** Not evidenced in the reviewed sources beyond NGO implementation contracts.\n\n---\n\n### What decision support tools were used in the MR decision process?\n\n**Answer:** **Social vulnerability assessments**, **Hazard maps & models** (inferred with low confidence), **Process guidance**, **Housing assessment**\n\n**Narrative:**\n- **Social vulnerability assessments:** The RAP included socioeconomic profiling and impoverishment risk analysis. [See et al., 2023] HPFPI conducted citywide surveys (2007) mapping informal settlements and housing conditions. [WRI, 2023] NGO stakeholder validation surveys assessed household socioeconomic conditions. [See et al., 2023]\n- **Hazard maps & models:** The IFCP was designed to protect against a 1-in-20-year flood event [See et al., 2023], implying that some form of flood risk analysis underpinned the engineering component. However, explicit hazard maps or modelling tools are not mentioned in the reviewed sources. This code is inferred cautiously from the flood-protection design standard.\n- **Process guidance:** The RAP itself serves as process guidance, complying with ADB and World Bank social safeguard frameworks. [See et al., 2023]\n- **Housing assessment:** The RAP's loss inventory and asset assessment of project-affected families (PAF) constitutes a form of housing assessment. [See et al., 2023]\n- **CBA:** Not used. [See et al., 2023]\n- **MCDA:** Not used. [See et al.," | |
| } | |
| ] |