Anna Zhou
Add deterministic geographic metadata queries
31a06e1
Raw History Blame Contribute Delete
62.1 kB
[
{
"case_id": "CS23",
"chunk_index": 0,
"section": "overview",
"location": "Portland, Oregon",
"country": "United States",
"country_normalized": "United States",
"continent": "North America",
"admin_area": "Oregon",
"source": "Pipeline Ver2 — Portland",
"source_links": [
{
"title": "Siders, A. R. (2019). Social justice implications of US managed retreat buyout programs. Climatic Change, 152(2), 239-257. https://doi.org/10.1007/s10584-018-2272-5",
"doi": "10.1007/s10584-018-2272-5",
"url": "https://doi.org/10.1007/s10584-018-2272-5"
},
{
"title": "Bower, E. R., Siders, A., Kraan, C. M., Mach, K. J., & Wong-Parodi, G. (2025). Navigating justice tensions in managed retreat. Environmental Science & Policy, 172, 104191. https://doi.org/10.1016/j.envsci.2025.104191",
"doi": "10.1016/j.envsci.2025.104191",
"url": "https://doi.org/10.1016/j.envsci.2025.104191"
},
{
"title": "Rashid, M. S., & Sutley, E. J. (2026). Managed retreat in the face of sea level rise: A multi-dimensional framework for climate resilience. International Journal of Disaster Risk Reduction, 132, 105952. https://doi.org/10.1016/j.ijdrr.2025.105952",
"doi": "10.1016/j.ijdrr.2025.105952",
"url": "https://doi.org/10.1016/j.ijdrr.2025.105952"
},
{
"title": "Lloyd, R., Pallathadka, A., Sauer, J., Chang, H., Iwaniec, D. M., Ajibade, I., Cook, E. M., & et al. (2026). From red tape to red infrastructure—Insights from urban flood risk management practitioners in four US cities. Urban Transitions, 6, 100036. https://doi.org/10.1016/j.ubtr.2026.100036",
"doi": "10.1016/j.ubtr.2026.100036",
"url": "https://doi.org/10.1016/j.ubtr.2026.100036"
},
{
"title": "Seong, K., Van Zandt, S., Peacock, W. G., & Newman, G. (2025). Racial and Ethnic Change in Floodplain Buyout Neighborhoods: Twenty-Five Years of Evidence from Houston. Journal of Planning Education and Research. https://doi.org/10.1177/0739456x251397310",
"doi": "10.1177/0739456x251397310",
"url": "https://doi.org/10.1177/0739456x251397310"
},
{
"title": "Vanucchi, J., Shi, L., & Hulet, C. (2025). Reconciliation or restoration? The ecological futures of floodplain buyout sites. Frontiers in Climate, 7. https://doi.org/10.3389/fclim.2025.1530483",
"doi": "10.3389/fclim.2025.1530483",
"url": "https://doi.org/10.3389/fclim.2025.1530483"
},
{
"title": "City of Portland Bureau of Environmental Services. (2012). East Lents Floodplain Restoration Project. Portland, Oregon. https://www.portlandoregon.gov/bes/article/286175",
"url": "https://www.portlandoregon.gov/bes/article/286175"
},
{
"title": "OregonLive. (2012, December). East Lents floodplain project. https://www.oregonlive.com/gresham/2012/12/east_lents_floodplain_project.html",
"url": "https://www.oregonlive.com/gresham/2012/12/east_lents_floodplain_project.html"
},
{
"title": "Vanucchi, J., Shi, L., & Hulet, C. (2025). Reconciliation or restoration? The ecological futures of floodplain buyout sites. Frontiers in Climate, 7, 1530483. https://doi.org/10.3389/fclim.2025.1530483",
"url": "https://doi.org/10.3389/fclim.2025.1530483"
},
{
"title": "Siders, A.R. (2018). Social justice implications of US managed retreat buyout programs. Climatic Change, 152(2), 239-257. https://doi.org/10.1007/s10584-018-2272-5",
"url": "https://doi.org/10.1007/s10584-018-2272-5"
},
{
"title": "Seong, K., Van Zandt, S., Peacock, W., & Newman, G. (2025). Racial and Ethnic Change in Floodplain Buyout Neighborhoods: Twenty-Five Years of Evidence from Houston. Journal of the American Planning Association. https://doi.org/10.1177/0739456x251397310",
"url": "https://doi.org/10.1177/0739456x251397310"
},
{
"title": "Bower, E., Siders, A.R., Kraan, C., Mach, K.J., & Wong-Parodi, G. (2025). Navigating justice tensions in managed retreat. Environmental Science & Policy, 164, 104191. https://doi.org/10.1016/j.envsci.2025.104191",
"url": "https://doi.org/10.1016/j.envsci.2025.104191"
},
{
"title": "Lloyd, R., Pallathadka, A., Sauer, J., Chang, H., Iwaniec, D.M., Ajibade, I., Cook, E., Berbés-Blázquez, M., Grimm, N.B., & Post, G. (2026). From Red Tape to Red Infrastructure: Insights from Urban Flood Risk Management Practitioners in Four US Cities. Urban and Transportation Reviews. https://doi.org/10.1016/j.ubtr.20",
"url": "https://doi.org/10.1016/j.ubtr.2026.100036"
},
{
"title": "Rashid, M.S., & Sutley, E. (2025). Managed Retreat in the Face of Sea Level Rise: A Multi-Dimensional Framework for Climate Resilience. International Journal of Disaster Risk Reduction, 105952. https://doi.org/10.1016/j.ijdrr.2025.105952",
"url": "https://doi.org/10.1016/j.ijdrr.2025.105952"
}
],
"text": "Case study: Portland (Portland, Oregon, United States)\nSection: CASE STUDY OVERVIEW\n\n**Case Name and Location:** East Lents Floodplain Restoration Project, Portland, Oregon, United States.\n\n**Hazard(s):** Flooding, including riverine and stormwater-driven (fluvial, pluvial, and infrastructural) flood risk from Johnson Creek, a creek that runs through southeast Portland and is described as a recurring site of flooding.\n\n**Type of Retreat:** Voluntary property buyout program. The City of Portland's Bureau of Environmental Services (BES) administers a \"Willing Seller Program\" associated with the Johnson Creek Restoration Plan, through which flood-prone residential properties in the East Lents neighborhood are acquired from willing homeowners, structures are demolished, and the land is converted to floodplain open space and ecological restoration areas.\n\n**Scale:** The reviewed sources do not provide a precise count of acquired parcels or displaced households specifically for the East Lents project, nor do they document total funding amounts for this specific project. Lloyd et al. (2026) describe the Portland Johnson Creek Restoration Plan's \"Willing Seller Program\" as having \"the highest number of buyout homes among our study cities\" (Portland, Phoenix, Atlanta, and Baltimore), characterizing it as a successful program implemented at \"limited scales.\" No household counts or dollar figures for the East Lents project specifically are available in the reviewed corpus.\n\n**Key Actors:** The City of Portland Bureau of Environmental Services (BES) is the primary administering agency. Lloyd et al. (2026) list multiple agencies involved in Portland flood risk management, including the Portland Bureau of Planning and Sustainability (PBPS), Portland Bureau of Transportation (PBOT), Portland Water Bureau (PWB), Portland Park Bureau (PPB), Multnomah County Drainage District (MCDD), the Oregon Department of Emergency Management (ODEM), and FEMA Region 10, among others (see Appendix A of Lloyd et al., 2026). Federal funding through FEMA's Hazard Mitigation Grant Program (HMGP) is identified in the broader Portland program context; Lloyd et al. (2026) also reference \"federal and state money\" in the context of Baltimore buyout sites, and the general HMGP structure described by Siders (2018) applies to programs of this type.\n\n**Timeline:** The primary source cited in the project's source list is a 2012 City of Portland BES document. However, the full text of this document was not available in the reviewed corpus, so no project-specific start date or milestone chronology can be verified from the reviewed materials. Lloyd et al. (2026) describe Portland's buyout program as ongoing, with practitioners referencing flood events including a recorded peak flow in Johnson Creek in 2015 and the 1996 Oregon flood. The Vanucchi et al. (2025) study notes that exemplary U.S. buyout programs like Austin's began in the 1980s and operate as \"standing programs,\" not solely post-disaster. Whether the broader Portland Johnson Creek program shares this standing-program character is suggested by Lloyd et al.'s (2026) description of BES being \"proactive in restoration efforts,\" but no verified continuous timeline is available from the reviewed sources.\n\n**Key Outcomes:** Outcomes described in the reviewed sources are general and programmatic rather than project-specific for East Lents. Lloyd et al. (2026) cite Portland's Willing Seller Program as an example of success in \"negotiating voluntary buyouts\" and \"restoring floodplains.\" The intent of the program is to reduce flood exposure, demolish at-risk structures, and convert floodplain land to open space and ecological restoration. Broader literature (Vanucchi et al., 2025; Siders, 2018) notes that buyout programs of this type commonly result in structure demolition and open-space requirements under HMGP, but also that ecological restoration of post-buyout lands is often incomplete, with many parcels remaining as maintained lawns rather than restored floodplain habitats.\n\n---\n\n### Narrative Summary\n\nThe East Lents Floodplain Restoration Project is a voluntary property buyout and floodplain restoration effort in the East Lents neighborhood of Portland, Oregon, situated along Johnson Creek in the southeast of the city. Johnson Creek is described by Portland flood risk practitioners as \"a site of recurring flooding,\" and Portland broadly faces \"fluvial, pluvial, and infrastructural flood risk\" expected to increase in the future (Lloyd et al., 2026). The project is part of Portland's Johnson Creek Restoration Plan and is administered by the City of Portland Bureau of Environmental Services (BES) through a \"Willing Seller Program,\" under which individual homeowners voluntarily sell flood-prone properties to the city. Structures are then demolished and the land is maintained as open space, consistent with FEMA Hazard Mitigation Grant Program (HMGP) requirements.\n\nPortland practitioners interviewed by Lloyd et al. (2026) described Portland's program as having \"the highest number of buyout homes among our study cities\" — the four cities studied being Portland, Phoenix, Atlanta, and Baltimore — and cited the Johnson Creek Restoration Plan as a positive example of flood risk mitigation through voluntary buyouts. Practitioners noted that BES has been \"proactive in restoration efforts to improve their drainage systems\" and referenced the importance of integrating buyouts into a broader planning vision for floodplain restoration. The program has also been noted for connecting flood mitigation with other community benefits such as open space, recreation, and ecological function.\n\nThe reviewed literature also identifies important challenges. Voluntary buyout programs, as described by Siders (2018) and Vanucchi et al. (2025), typically produce scattered (checkerboard) patterns of acquisition over time, complicate comprehensive floodplain restoration, and leave many parcels in a state of incomplete ecological recovery — often maintained as mowed lawns rather than dynamic floodplain ecosystems. Equity concerns documented in the broader U.S. buyout literature — including unequal access to buyout offers depending on income and insurance status, and inadequate compensation for low-income homeowners — may be applicable to Portland's program context, though they are not directly documented for East Lents in the reviewed sources. The sources also caution against drawing firm conclusions about Portland-specific outcomes from the available evidence, as most detailed project data was not accessible in the reviewed corpus.\n\n---"
},
{
"case_id": "CS23",
"chunk_index": 1,
"section": "coding_questions",
"location": "Portland, Oregon",
"country": "United States",
"country_normalized": "United States",
"continent": "North America",
"admin_area": "Oregon",
"source": "Pipeline Ver2 — Portland",
"source_links": [
{
"title": "Siders, A. R. (2019). Social justice implications of US managed retreat buyout programs. Climatic Change, 152(2), 239-257. https://doi.org/10.1007/s10584-018-2272-5",
"doi": "10.1007/s10584-018-2272-5",
"url": "https://doi.org/10.1007/s10584-018-2272-5"
},
{
"title": "Bower, E. R., Siders, A., Kraan, C. M., Mach, K. J., & Wong-Parodi, G. (2025). Navigating justice tensions in managed retreat. Environmental Science & Policy, 172, 104191. https://doi.org/10.1016/j.envsci.2025.104191",
"doi": "10.1016/j.envsci.2025.104191",
"url": "https://doi.org/10.1016/j.envsci.2025.104191"
},
{
"title": "Rashid, M. S., & Sutley, E. J. (2026). Managed retreat in the face of sea level rise: A multi-dimensional framework for climate resilience. International Journal of Disaster Risk Reduction, 132, 105952. https://doi.org/10.1016/j.ijdrr.2025.105952",
"doi": "10.1016/j.ijdrr.2025.105952",
"url": "https://doi.org/10.1016/j.ijdrr.2025.105952"
},
{
"title": "Lloyd, R., Pallathadka, A., Sauer, J., Chang, H., Iwaniec, D. M., Ajibade, I., Cook, E. M., & et al. (2026). From red tape to red infrastructure—Insights from urban flood risk management practitioners in four US cities. Urban Transitions, 6, 100036. https://doi.org/10.1016/j.ubtr.2026.100036",
"doi": "10.1016/j.ubtr.2026.100036",
"url": "https://doi.org/10.1016/j.ubtr.2026.100036"
},
{
"title": "Seong, K., Van Zandt, S., Peacock, W. G., & Newman, G. (2025). Racial and Ethnic Change in Floodplain Buyout Neighborhoods: Twenty-Five Years of Evidence from Houston. Journal of Planning Education and Research. https://doi.org/10.1177/0739456x251397310",
"doi": "10.1177/0739456x251397310",
"url": "https://doi.org/10.1177/0739456x251397310"
},
{
"title": "Vanucchi, J., Shi, L., & Hulet, C. (2025). Reconciliation or restoration? The ecological futures of floodplain buyout sites. Frontiers in Climate, 7. https://doi.org/10.3389/fclim.2025.1530483",
"doi": "10.3389/fclim.2025.1530483",
"url": "https://doi.org/10.3389/fclim.2025.1530483"
},
{
"title": "City of Portland Bureau of Environmental Services. (2012). East Lents Floodplain Restoration Project. Portland, Oregon. https://www.portlandoregon.gov/bes/article/286175",
"url": "https://www.portlandoregon.gov/bes/article/286175"
},
{
"title": "OregonLive. (2012, December). East Lents floodplain project. https://www.oregonlive.com/gresham/2012/12/east_lents_floodplain_project.html",
"url": "https://www.oregonlive.com/gresham/2012/12/east_lents_floodplain_project.html"
},
{
"title": "Vanucchi, J., Shi, L., & Hulet, C. (2025). Reconciliation or restoration? The ecological futures of floodplain buyout sites. Frontiers in Climate, 7, 1530483. https://doi.org/10.3389/fclim.2025.1530483",
"url": "https://doi.org/10.3389/fclim.2025.1530483"
},
{
"title": "Siders, A.R. (2018). Social justice implications of US managed retreat buyout programs. Climatic Change, 152(2), 239-257. https://doi.org/10.1007/s10584-018-2272-5",
"url": "https://doi.org/10.1007/s10584-018-2272-5"
},
{
"title": "Seong, K., Van Zandt, S., Peacock, W., & Newman, G. (2025). Racial and Ethnic Change in Floodplain Buyout Neighborhoods: Twenty-Five Years of Evidence from Houston. Journal of the American Planning Association. https://doi.org/10.1177/0739456x251397310",
"url": "https://doi.org/10.1177/0739456x251397310"
},
{
"title": "Bower, E., Siders, A.R., Kraan, C., Mach, K.J., & Wong-Parodi, G. (2025). Navigating justice tensions in managed retreat. Environmental Science & Policy, 164, 104191. https://doi.org/10.1016/j.envsci.2025.104191",
"url": "https://doi.org/10.1016/j.envsci.2025.104191"
},
{
"title": "Lloyd, R., Pallathadka, A., Sauer, J., Chang, H., Iwaniec, D.M., Ajibade, I., Cook, E., Berbés-Blázquez, M., Grimm, N.B., & Post, G. (2026). From Red Tape to Red Infrastructure: Insights from Urban Flood Risk Management Practitioners in Four US Cities. Urban and Transportation Reviews. https://doi.org/10.1016/j.ubtr.20",
"url": "https://doi.org/10.1016/j.ubtr.2026.100036"
},
{
"title": "Rashid, M.S., & Sutley, E. (2025). Managed Retreat in the Face of Sea Level Rise: A Multi-Dimensional Framework for Climate Resilience. International Journal of Disaster Risk Reduction, 105952. https://doi.org/10.1016/j.ijdrr.2025.105952",
"url": "https://doi.org/10.1016/j.ijdrr.2025.105952"
}
],
"text": "Case study: Portland (Portland, Oregon, United States)\nSection: CODING QUESTIONS\n\n---\n\n### Is there any evidence of a proactive or reactive trigger in the MR decision process? (Reactive/Proactive)\n\n**Direct Answer: Reactive, with evidence suggesting some proactive elements at the broader program level.**\n\n**Narrative:** Johnson Creek is described by Portland practitioners as \"a site of recurring flooding,\" and Portland has experienced notable flood events including a major event in 1996 and a historic peak flow on Johnson Creek in 2015 (Lloyd et al., 2026). Siders (2018) notes that most U.S. buyout programs are initiated reactively after disasters, when HMGP and CDBG-DR funding becomes available. This reactive pattern is consistent with how Portland's buyout activity is situated in the context of historic flood events.\n\nHowever, Lloyd et al. (2026) also describe Portland BES as \"proactive in restoration efforts to improve their drainage systems,\" and the Johnson Creek Restoration Plan is presented as a deliberate, longer-term planning framework rather than solely a post-disaster response. Vanucchi et al. (2025) distinguish exemplary U.S. buyout programs as \"standing programs\" that operate continuously, including between disaster events, rather than being created only in the aftermath of a disaster. Lloyd et al.'s (2026) reference to Portland having \"success in negotiating voluntary buyouts\" and \"restoring floodplains\" as part of a broader resilience approach suggests a degree of proactive planning orientation.\n\n**Coding rationale:** \"Reactive\" is the primary coding, given the program's historical roots in repetitive flood damage and reliance on disaster-linked federal funding structures described by Siders (2018). \"Proactive\" is a secondary and indirect inference based on practitioner accounts in Lloyd et al. (2026) describing a standing, anticipatory dimension to Portland's flood management approach. The auditor's preferred reading — \"Reactive\" as the strongest code, with \"Proactive\" retained only if labeled as an indirect inference from broader program literature — has been followed here.\n\n**Uncertainty note:** The evidence for the proactive element is indirect, based on practitioner characterizations in a multi-city interview study rather than on documentation of a formal pre-disaster planning decision for East Lents specifically.\n\n---\n\n### Date, Number of households affected, Number of population affected, Total funding\n\n**Date:** The primary source cited in the project's source list is a 2012 City of Portland BES document, but the full text of this document was not available in the reviewed corpus. The reviewed academic sources do not provide a verified start date for the East Lents project. The broader Johnson Creek buyout and restoration program is described as ongoing across multiple years, with flood events in 1996 and 2015 referenced by practitioners (Lloyd et al., 2026), but a precise continuous timeline is not established in the reviewed sources.\n\n**Number of households affected:** Not specified in the reviewed sources for the East Lents project specifically.\n\n**Number of population affected:** Not specified in the reviewed sources.\n\n**Total funding:** Not specified for this project in the reviewed sources. HMGP is identified as the primary federal funding mechanism for programs of this type (Siders, 2018; Lloyd et al., 2026). No project-specific dollar amounts are reported.\n\n**Uncertainty note:** The BES (2012) primary source and the OregonLive supplemental source are listed in the case source file but were not available as full text in the reviewed corpus. All specific household counts, population figures, and funding totals remain unverifiable from the documents reviewed.\n\n---\n\n### What is the occurrence of the hazard(s) considered in the MR decision process? (Single Hazard/Multiple Hazards)\n\n**Direct Answer: Single Hazard (Flooding).**\n\n**Narrative:** All reviewed sources reference flooding as the sole hazard driving the East Lents project. Lloyd et al. (2026) describe Johnson Creek specifically as \"a site of recurring flooding\" and note that Portland faces \"fluvial, pluvial, and infrastructural flood risk.\" While Portland practitioners also mentioned landslides as an emerging risk in the broader Portland area (Lloyd et al., 2026), this is referenced as a future concern for broader planning, not as a driver of the East Lents buyout program.\n\n**Coding rationale:** \"Single Hazard\" is the appropriate coding. The hazard is flooding — including both riverine flooding from Johnson Creek and stormwater-driven inundation — from a single creek system.\n\n---\n\n### What is the origin of the hazards considered in the MR decision process? (Technological Hazard/Natural Hazard)\n\n**Direct Answer: Natural Hazard.**\n\n**Narrative:** Flooding from Johnson Creek is a natural hazard. Lloyd et al. (2026) note that urbanization and aging stormwater infrastructure in Portland (including \"pipes backing up into neighborhoods during periods of high rainfall\") contribute to flood risk, but the primary driver of the East Lents buyout program is natural riverine and stormwater flooding. Climate change is referenced by Portland practitioners as an amplifying factor for future flood risk (Lloyd et al., 2026), but this does not change the classification of the underlying hazard origin.\n\n**Coding rationale:** \"Natural Hazard\" is the appropriate coding.\n\n---\n\n### Was this hazard considered in the MR decision process? (Coastal Flooding/Erosion), (Riverine/Pluvial Flooding), (Lake Flooding/Erosion), (Wildfire), (Volcano), (Land Subsidence), (Landslide/Debris Flow), (Earthquake), (Tsunami), (Hurricane), (Other)\n\n**Direct Answer: Riverine/Pluvial Flooding.**\n\n**Narrative:** Johnson Creek is a freshwater creek subject to overbank flooding (riverine flooding) and stormwater-driven inundation (pluvial flooding). Lloyd et al. (2026) confirm that \"fluvial, pluvial, and infrastructural flood risk persist in the city\" with Johnson Creek as the primary recurring site. The East Lents neighborhood is situated in the Johnson Creek floodplain, and the buyout program is designed to restore floodplain function and reduce flood exposure for residents in that corridor.\n\n---\n\n### What was the geographic scale of the MR project? (Individual homes), (A few streets), (Neighbourhood), (Entire community), (Sub-watershed), (Watershed region)\n\n**Direct Answer: Individual homes, within a neighborhood-scale program context.**\n\n**Narrative:** The East Lents project is concentrated within a specific flood-affected neighbourhood along Johnson Creek in southeast Portland. Buyouts are conducted at the individual parcel level through voluntary willing-seller agreements. Lloyd et al. (2026) describe \"a really robust program of buying out homes in the floodplain\" as a neighborhood-level effort. Vanucchi et al. (2025) note that voluntary buyout programs generally produce \"checkerboarding\" — scattered individual parcel acquisitions — within neighborhoods, which is consistent with Portland's program structure as described in the literature.\n\n**Coding rationale:** \"Individual homes\" is the primary coding (parcel-level acquisition). \"Neighbourhood\" is a secondary geographic descriptor reflecting that acquisitions are concentrated within the East Lents area. The auditor's guidance has been followed: \"neighbourhood\" is retained only because Lloyd et al. (2026) explicitly describe the program as neighborhood-scale and reference the Willing Seller Program within the context of the Johnson Creek Restoration Plan, which targets a defined geographic area.\n\n---\n\n### Who or what was retreated? (Individuals), (Groups/Neighbourhoods), (Communities), (Critical infrastructure), (Hazard protection structures), (Industrial assets)\n\n**Direct Answer: Individuals (homeowners).**\n\n**Narrative:** The primary subjects of retreat are individual homeowners and their households, who sold properties through the willing-seller program. This is consistent with the HMGP voluntary buyout structure described by Siders (2018) and the Portland program as characterized by Lloyd et al. (2026). No critical infrastructure, hazard protection structures, or industrial assets are identified in the reviewed sources as components of this specific retreat.\n\n**Coding rationale:** \"Individuals\" is the appropriate primary coding. Per the auditor's guidance, \"Groups/Neighbourhoods\" would require direct source evidence that the East Lents project involved a coordinated neighborhood relocation rather than an aggregation of individual transactions; such evidence is not directly provided in the reviewed sources. The program is framed as individual willing-seller transactions aggregated over time.\n\n**Alternative interpretation:** The concentration of acquisitions within the East Lents neighbourhood could be argued to produce neighbourhood-scale effects over time, but the reviewed sources do not document East Lents as a planned collective relocation distinct from an accumulation of individual decisions.\n\n---"
},
{
"case_id": "CS23",
"chunk_index": 2,
"section": "institutional_environment",
"location": "Portland, Oregon",
"country": "United States",
"country_normalized": "United States",
"continent": "North America",
"admin_area": "Oregon",
"source": "Pipeline Ver2 — Portland",
"source_links": [
{
"title": "Siders, A. R. (2019). Social justice implications of US managed retreat buyout programs. Climatic Change, 152(2), 239-257. https://doi.org/10.1007/s10584-018-2272-5",
"doi": "10.1007/s10584-018-2272-5",
"url": "https://doi.org/10.1007/s10584-018-2272-5"
},
{
"title": "Bower, E. R., Siders, A., Kraan, C. M., Mach, K. J., & Wong-Parodi, G. (2025). Navigating justice tensions in managed retreat. Environmental Science & Policy, 172, 104191. https://doi.org/10.1016/j.envsci.2025.104191",
"doi": "10.1016/j.envsci.2025.104191",
"url": "https://doi.org/10.1016/j.envsci.2025.104191"
},
{
"title": "Rashid, M. S., & Sutley, E. J. (2026). Managed retreat in the face of sea level rise: A multi-dimensional framework for climate resilience. International Journal of Disaster Risk Reduction, 132, 105952. https://doi.org/10.1016/j.ijdrr.2025.105952",
"doi": "10.1016/j.ijdrr.2025.105952",
"url": "https://doi.org/10.1016/j.ijdrr.2025.105952"
},
{
"title": "Lloyd, R., Pallathadka, A., Sauer, J., Chang, H., Iwaniec, D. M., Ajibade, I., Cook, E. M., & et al. (2026). From red tape to red infrastructure—Insights from urban flood risk management practitioners in four US cities. Urban Transitions, 6, 100036. https://doi.org/10.1016/j.ubtr.2026.100036",
"doi": "10.1016/j.ubtr.2026.100036",
"url": "https://doi.org/10.1016/j.ubtr.2026.100036"
},
{
"title": "Seong, K., Van Zandt, S., Peacock, W. G., & Newman, G. (2025). Racial and Ethnic Change in Floodplain Buyout Neighborhoods: Twenty-Five Years of Evidence from Houston. Journal of Planning Education and Research. https://doi.org/10.1177/0739456x251397310",
"doi": "10.1177/0739456x251397310",
"url": "https://doi.org/10.1177/0739456x251397310"
},
{
"title": "Vanucchi, J., Shi, L., & Hulet, C. (2025). Reconciliation or restoration? The ecological futures of floodplain buyout sites. Frontiers in Climate, 7. https://doi.org/10.3389/fclim.2025.1530483",
"doi": "10.3389/fclim.2025.1530483",
"url": "https://doi.org/10.3389/fclim.2025.1530483"
},
{
"title": "City of Portland Bureau of Environmental Services. (2012). East Lents Floodplain Restoration Project. Portland, Oregon. https://www.portlandoregon.gov/bes/article/286175",
"url": "https://www.portlandoregon.gov/bes/article/286175"
},
{
"title": "OregonLive. (2012, December). East Lents floodplain project. https://www.oregonlive.com/gresham/2012/12/east_lents_floodplain_project.html",
"url": "https://www.oregonlive.com/gresham/2012/12/east_lents_floodplain_project.html"
},
{
"title": "Vanucchi, J., Shi, L., & Hulet, C. (2025). Reconciliation or restoration? The ecological futures of floodplain buyout sites. Frontiers in Climate, 7, 1530483. https://doi.org/10.3389/fclim.2025.1530483",
"url": "https://doi.org/10.3389/fclim.2025.1530483"
},
{
"title": "Siders, A.R. (2018). Social justice implications of US managed retreat buyout programs. Climatic Change, 152(2), 239-257. https://doi.org/10.1007/s10584-018-2272-5",
"url": "https://doi.org/10.1007/s10584-018-2272-5"
},
{
"title": "Seong, K., Van Zandt, S., Peacock, W., & Newman, G. (2025). Racial and Ethnic Change in Floodplain Buyout Neighborhoods: Twenty-Five Years of Evidence from Houston. Journal of the American Planning Association. https://doi.org/10.1177/0739456x251397310",
"url": "https://doi.org/10.1177/0739456x251397310"
},
{
"title": "Bower, E., Siders, A.R., Kraan, C., Mach, K.J., & Wong-Parodi, G. (2025). Navigating justice tensions in managed retreat. Environmental Science & Policy, 164, 104191. https://doi.org/10.1016/j.envsci.2025.104191",
"url": "https://doi.org/10.1016/j.envsci.2025.104191"
},
{
"title": "Lloyd, R., Pallathadka, A., Sauer, J., Chang, H., Iwaniec, D.M., Ajibade, I., Cook, E., Berbés-Blázquez, M., Grimm, N.B., & Post, G. (2026). From Red Tape to Red Infrastructure: Insights from Urban Flood Risk Management Practitioners in Four US Cities. Urban and Transportation Reviews. https://doi.org/10.1016/j.ubtr.20",
"url": "https://doi.org/10.1016/j.ubtr.2026.100036"
},
{
"title": "Rashid, M.S., & Sutley, E. (2025). Managed Retreat in the Face of Sea Level Rise: A Multi-Dimensional Framework for Climate Resilience. International Journal of Disaster Risk Reduction, 105952. https://doi.org/10.1016/j.ijdrr.2025.105952",
"url": "https://doi.org/10.1016/j.ijdrr.2025.105952"
}
],
"text": "Case study: Portland (Portland, Oregon, United States)\nSection: INSTITUTIONAL ENVIRONMENT\n\n---\n\n### What is the focus or scope of the MR project? (Individual buyout/retreat), (Community buyout/retreat), (Leasebacks, easements and buffers), (Other acquisition tools), (Managed realignment of infrastructure)\n\n**Direct Answer: Individual buyout/retreat (primary); with a community planning context that gives the program a broader scope.**\n\n**Narrative:** The East Lents project is primarily an individual voluntary property buyout program in which homeowners chose to sell their properties to the city. Siders (2018) describes FEMA's HMGP buyouts as voluntary individual transactions, and Lloyd et al. (2026) describe the Portland program as a \"Willing Seller Program.\" The program is embedded within the Johnson Creek Restoration Plan, a broader neighbourhood-scale and watershed-scale planning effort, which gives it a collective planning character beyond purely individual transactions.\n\n**Coding rationale:** \"Individual buyout/retreat\" is the primary coding. \"Community buyout/retreat\" is not strongly supported because the reviewed sources do not document a coordinated collective relocation of a settlement; rather, the program aggregates individual parcel acquisitions. The broader planning context (Johnson Creek Restoration Plan) is noted as contextual framing.\n\n---\n\n### What legal constraints or requirements were identified during the MR decision process?\n\n**Direct Answer:** Multiple legal categories are relevant. Evidence ranges from directly applicable general HMGP rules to Portland-specific references.\n\n**Narrative by category:**\n\n- **Relevant regulations/acts:** FEMA's Hazard Mitigation Grant Program (HMGP) regulations govern eligibility, cost-benefit analysis requirements, and open-space deed restrictions post-acquisition (Siders, 2018). These apply to any HMGP-funded buyout, including programs of the type described in Portland.\n- **Home acquisition:** Voluntary purchase of homes at pre-disaster fair market value as determined by a licensed appraiser is the standard HMGP mechanism (Siders, 2018). All HMGP acquisitions are voluntary; local officials may not use eminent domain or condemnation powers under HMGP (Siders, 2018).\n- **Land acquisition:** HMGP-funded acquisitions within the 100-year floodplain require demolition and open-space maintenance in perpetuity (Siders, 2018).\n- **Title(s) transfer:** Properties acquired through HMGP are transferred from private to public ownership, with deed restrictions preventing future development (Siders, 2018; Vanucchi et al., 2025).\n- **Land rezoning:** Vanucchi et al. (2025) document that rezoning parcels to conservation land status is a best practice to prevent \"collective amnesia\" and future development pressure; they used local zoning data to assess conservation status of buyout parcels in their case studies. Whether Portland's parcels have been rezoned in this manner is not documented in the reviewed sources.\n- **Retreat land development:** FEMA HMGP prohibits redevelopment of acquired floodplain properties; they must be maintained as open space. Since 2013, FEMA allows post-buyout climate resilience activities such as floodplain restoration to be factored into benefit-cost analysis (Vanucchi et al., 2025).\n- **Compliance & enforcement:** FEMA deed restrictions enforced by federal requirements ensure permanent open-space status (Siders, 2018).\n- **Legal authority over retreat:** Local governments administer HMGP buyouts with state oversight and federal funding; Portland BES administers the program (Lloyd et al., 2026; Siders, 2018).\n- **Litigation:** Siders (2018) notes that in some U.S. buyout cases residents have filed lawsuits (e.g., Grand Forks, ND). No litigation evidence is found for East Lents in the reviewed sources.\n\n**Uncertainty note:** Portland-specific legal instruments (Oregon state laws, Portland municipal ordinances) governing this project are not described in the reviewed sources. The above reflects general HMGP legal framework, which applies to programs of this type as described by Siders (2018), not Portland-specific verified documentation.\n\n---\n\n### What were the funding sources for the MR project?\n\n**Direct Answer: Federal (HMGP) funding is the primary identified source. State and local contributions are referenced in the broader Portland program context but not documented specifically for East Lents.**\n\n**Narrative:** Siders (2018) describes the standard HMGP cost-sharing structure under which the federal government provides 75% of program costs and states or localities provide the remaining 25%, often from CDBG or other sources. Lloyd et al. (2026) reference the use of \"federal and state money\" in the context of Baltimore buyout sites following flooding, and more broadly describe Portland's program as funded through mechanisms consistent with this structure. The Vanucchi et al. (2025) study notes that exemplary standing buyout programs in the U.S. draw on a distinct mix of federal, state, and local funding that allows them to operate continuously.\n\n**Coding rationale:** \"Multiple funders\" with Federal (HMGP) as primary is the most defensible coding at the level of the broader Portland program. The auditor's guidance has been followed: this coding is retained but explicitly labeled as applying to the broader program context, with a note that project-specific funding documentation for East Lents is not available in the reviewed corpus.\n\n---\n\n### What was considered to maintain (or improve) the tax base in the MR decision process?\n\n**Direct Answer: No direct evidence found for East Lents. Indirect evidence from the broader literature suggests this is not a primary consideration.**\n\n**Narrative:** Siders (2018) discusses tax base concerns as a general factor in U.S. buyout programs, noting that buyouts reduce local property tax revenue and that some cities (e.g., New York City) have opposed buyouts partly for this reason. The reviewed sources do not document explicit tax base maintenance strategies for the East Lents project or Portland's Johnson Creek program.\n\n**Coding rationale:** No code is assigned. The codebook category \"Redevelopment of retreat lands\" was considered but is not directly supported for East Lents; open-space conversion under HMGP prohibits revenue-generating redevelopment. The broader literature references conversion to parks and greenspace as a potential community benefit framing (Lloyd et al., 2026; Siders, 2018), but this is not the same as a tax base maintenance strategy.\n\n---\n\n### What level/type of compensation mechanisms were considered in the MR decision process?\n\n**Direct Answer: Market value (pre-disaster fair market value) — this is the standard HMGP mechanism applicable to this program type.**\n\n**Narrative:** Under HMGP, all buyouts require compensation at pre-disaster fair market value as determined by a licensed appraiser (Siders, 2018). This is the standard mechanism applicable to Portland's program, though it is described as a general rule rather than a Portland-specific verified finding. Siders (2018) notes that programs may offer additional incentive payments (e.g., New York's post-Sandy program offered bonuses for relocating within the city), but no such additional incentives are documented for East Lents.\n\nSeong et al. (2025), studying Harris County HMGP buyouts, found that compensation disparities exist — with low-income homeowners more likely to perceive offers as inadequate and wealthier homeowners more likely to view offers as fair. This general pattern is plausibly relevant to Portland's context but is not directly documented for East Lents.\n\n**Coding rationale:** \"Market value\" (pre-disaster FMV) is the primary coding, based on Siders' (2018) description of HMGP requirements. \"Free supports and services (demolition)\" was considered but the auditor correctly identified that demolition under HMGP is a project requirement (and a condition of receiving federal funds), not necessarily a benefit offered to individual sellers as compensation. It is therefore not coded as compensation here.\n\n**Uncertainty note:** Whether Portland's specific program offered any relocation bonuses or additional incentives beyond standard HMGP FMV is not documented in the reviewed sources.\n\n---"
},
{
"case_id": "CS23",
"chunk_index": 3,
"section": "planning_processes",
"location": "Portland, Oregon",
"country": "United States",
"country_normalized": "United States",
"continent": "North America",
"admin_area": "Oregon",
"source": "Pipeline Ver2 — Portland",
"source_links": [
{
"title": "Siders, A. R. (2019). Social justice implications of US managed retreat buyout programs. Climatic Change, 152(2), 239-257. https://doi.org/10.1007/s10584-018-2272-5",
"doi": "10.1007/s10584-018-2272-5",
"url": "https://doi.org/10.1007/s10584-018-2272-5"
},
{
"title": "Bower, E. R., Siders, A., Kraan, C. M., Mach, K. J., & Wong-Parodi, G. (2025). Navigating justice tensions in managed retreat. Environmental Science & Policy, 172, 104191. https://doi.org/10.1016/j.envsci.2025.104191",
"doi": "10.1016/j.envsci.2025.104191",
"url": "https://doi.org/10.1016/j.envsci.2025.104191"
},
{
"title": "Rashid, M. S., & Sutley, E. J. (2026). Managed retreat in the face of sea level rise: A multi-dimensional framework for climate resilience. International Journal of Disaster Risk Reduction, 132, 105952. https://doi.org/10.1016/j.ijdrr.2025.105952",
"doi": "10.1016/j.ijdrr.2025.105952",
"url": "https://doi.org/10.1016/j.ijdrr.2025.105952"
},
{
"title": "Lloyd, R., Pallathadka, A., Sauer, J., Chang, H., Iwaniec, D. M., Ajibade, I., Cook, E. M., & et al. (2026). From red tape to red infrastructure—Insights from urban flood risk management practitioners in four US cities. Urban Transitions, 6, 100036. https://doi.org/10.1016/j.ubtr.2026.100036",
"doi": "10.1016/j.ubtr.2026.100036",
"url": "https://doi.org/10.1016/j.ubtr.2026.100036"
},
{
"title": "Seong, K., Van Zandt, S., Peacock, W. G., & Newman, G. (2025). Racial and Ethnic Change in Floodplain Buyout Neighborhoods: Twenty-Five Years of Evidence from Houston. Journal of Planning Education and Research. https://doi.org/10.1177/0739456x251397310",
"doi": "10.1177/0739456x251397310",
"url": "https://doi.org/10.1177/0739456x251397310"
},
{
"title": "Vanucchi, J., Shi, L., & Hulet, C. (2025). Reconciliation or restoration? The ecological futures of floodplain buyout sites. Frontiers in Climate, 7. https://doi.org/10.3389/fclim.2025.1530483",
"doi": "10.3389/fclim.2025.1530483",
"url": "https://doi.org/10.3389/fclim.2025.1530483"
},
{
"title": "City of Portland Bureau of Environmental Services. (2012). East Lents Floodplain Restoration Project. Portland, Oregon. https://www.portlandoregon.gov/bes/article/286175",
"url": "https://www.portlandoregon.gov/bes/article/286175"
},
{
"title": "OregonLive. (2012, December). East Lents floodplain project. https://www.oregonlive.com/gresham/2012/12/east_lents_floodplain_project.html",
"url": "https://www.oregonlive.com/gresham/2012/12/east_lents_floodplain_project.html"
},
{
"title": "Vanucchi, J., Shi, L., & Hulet, C. (2025). Reconciliation or restoration? The ecological futures of floodplain buyout sites. Frontiers in Climate, 7, 1530483. https://doi.org/10.3389/fclim.2025.1530483",
"url": "https://doi.org/10.3389/fclim.2025.1530483"
},
{
"title": "Siders, A.R. (2018). Social justice implications of US managed retreat buyout programs. Climatic Change, 152(2), 239-257. https://doi.org/10.1007/s10584-018-2272-5",
"url": "https://doi.org/10.1007/s10584-018-2272-5"
},
{
"title": "Seong, K., Van Zandt, S., Peacock, W., & Newman, G. (2025). Racial and Ethnic Change in Floodplain Buyout Neighborhoods: Twenty-Five Years of Evidence from Houston. Journal of the American Planning Association. https://doi.org/10.1177/0739456x251397310",
"url": "https://doi.org/10.1177/0739456x251397310"
},
{
"title": "Bower, E., Siders, A.R., Kraan, C., Mach, K.J., & Wong-Parodi, G. (2025). Navigating justice tensions in managed retreat. Environmental Science & Policy, 164, 104191. https://doi.org/10.1016/j.envsci.2025.104191",
"url": "https://doi.org/10.1016/j.envsci.2025.104191"
},
{
"title": "Lloyd, R., Pallathadka, A., Sauer, J., Chang, H., Iwaniec, D.M., Ajibade, I., Cook, E., Berbés-Blázquez, M., Grimm, N.B., & Post, G. (2026). From Red Tape to Red Infrastructure: Insights from Urban Flood Risk Management Practitioners in Four US Cities. Urban and Transportation Reviews. https://doi.org/10.1016/j.ubtr.20",
"url": "https://doi.org/10.1016/j.ubtr.2026.100036"
},
{
"title": "Rashid, M.S., & Sutley, E. (2025). Managed Retreat in the Face of Sea Level Rise: A Multi-Dimensional Framework for Climate Resilience. International Journal of Disaster Risk Reduction, 105952. https://doi.org/10.1016/j.ijdrr.2025.105952",
"url": "https://doi.org/10.1016/j.ijdrr.2025.105952"
}
],
"text": "Case study: Portland (Portland, Oregon, United States)\nSection: PLANNING PROCESSES\n\n---\n\n### What is the time horizon considered in the MR decision process?\n\n**Direct Answer: Pre-retreat planning; Immediate risks (1–5 years); Anticipated future risks (10–100 years); Post-retreat follow-up.**\n\n**Narrative:**\n\n- **Pre-retreat planning:** The Johnson Creek Restoration Plan is a deliberate planning document that preceded and guided acquisitions, consistent with a pre-retreat planning orientation. Lloyd et al. (2026) describe BES as proactive in restoration efforts.\n- **Immediate risks (1–5 years):** Johnson Creek flooding is a recurring, near-term hazard that has driven the program, with notable events in 1996 and 2015 (Lloyd et al., 2026).\n- **Anticipated future risks (10–100 years):** Portland practitioners interviewed by Lloyd et al. (2026) explicitly discussed climate change increasing future flood risk: \"flood risk in their cities had increased in the last one to two decades and would likely increase further in the future.\"\n- **Post-retreat follow-up:** Vanucchi et al. (2025) document that post-buyout land management is an ongoing challenge for programs like these, including management of acquired parcels, ecological restoration, and community engagement. Portland BES is described as moving toward best management practices, but ongoing management responsibilities are also cited as a burden on local governments (Lloyd et al., 2026: \"vacant properties must still be managed, which loads further responsibility onto local governments\").\n\n---\n\n### What planning elements were considered in the MR decision process?\n\n**Direct Answer (with source basis and confidence noted for each):**\n\n- **Top-down:** Directly supported. Federal and local government-led program structure, with FEMA setting eligibility criteria and Portland BES administering (Siders, 2018; Lloyd et al., 2026).\n- **Cost-benefit analysis (CBA):** Directly supported for HMGP-funded programs generally. Siders (2018) states that FEMA HMGP commonly requires cost-benefit analysis for all funded projects. This applies to Portland's program as an HMGP participant.\n- **Coordination with other sectors and jurisdictions:** Supported. Lloyd et al. (2026) provide an extensive list of agencies involved in Portland flood risk management (Appendix A), spanning city bureaus, county, state, and federal levels, indicating multi-agency coordination.\n- **Multi-stage retreat:** Supported. The voluntary, willing-seller model produces a phased, multi-stage acquisition process over many years rather than a single-stage relocation (Lloyd et al., 2026; Siders, 2018).\n- **Adaptive management:** Partially supported, based on Lloyd et al.'s (2026) description of BES being \"proactive in restoration efforts.\" Vanucchi et al. (2025) describe Austin's analogous program as using adaptive management including stream health monitoring, and note that standing programs can evolve over time; whether Portland's program formally uses adaptive management is not directly documented.\n- **Participatory/collaborative:** Limited direct evidence for East Lents specifically. Lloyd et al. (2026) describe Portland's practitioners as emphasizing community engagement and public outreach, but specific participatory mechanisms for the East Lents project are not documented.\n- **Degree of transparency:** Not directly evidenced for East Lents. Siders (2018) identifies lack of transparency as a general concern in U.S. buyout programs, but Portland is not specifically identified as either a positive or negative example in the reviewed sources.\n- **Multi-sectoral:** Supported by the multi-agency structure documented in Lloyd et al. (2026) Appendix A, though direct evidence of multi-sectoral coordination specific to East Lents is not available.\n- **MCDA, Bottom-up, Public-private partnerships, Bureaucracy reduction:** No evidence found in reviewed sources for East Lents.\n- **Single stage retreat:** Not applicable; the voluntary model is multi-stage.\n\n---\n\n### What decision support tools were used in the MR decision process?\n\n**Direct Answer:**\n\n- **CBA:** Supported. HMGP commonly requires cost-benefit analysis for funded projects (Siders, 2018). Since 2013, FEMA has allowed ecosystem service benefits to be included in CBA (Vanucchi et al., 2025).\n- **Hazard maps & models:** Supported. FEMA flood maps are referenced throughout (Lloyd et al., 2026). Portland's Practitioner 2 described the FEMA 100-year floodplain map as \"woefully out of date\" for their area and noted that Portland has been proactive in additional drainage and flood risk mapping (Lloyd et al., 2026).\n- **Process guidance:** Supported. FEMA Hazard Mitigation Assistance Guidance provides the process framework applicable to all HMGP programs (Siders, 2018).\n- **Housing assessment:** Supported in principle. Property value determination and damage assessment are required as part of HMGP eligibility (Siders, 2018), but no Portland-specific housing assessment documentation is available.\n- **CC projection models:** Not directly evidenced. Portland practitioners reference future climate change increasing flood risk (Lloyd et al., 2026), suggesting climate awareness in planning, but no formal use of climate projection models in East Lents decision-making is documented. Per the auditor's guidance, this code is not assigned.\n- **Social vulnerability assessments, Demographic projections, Socioeconomic projections, MCDA, New site evaluation process:** No direct evidence found in reviewed sources for East Lents.\n\n---\n\n### What planning measures were taken for receiving areas in the MR decision process?\n\n**Direct Answer: Limited evidence. No specific receiving area planning measures are documented for East Lents.**\n\n**Narrative:** Siders (2018) identifies this as a general gap in U.S. buyout programs, noting that \"few studies have explored where homeowners relocate\" and that \"without assistance, residents relocate in neighborhoods with equal or greater flood risk and increased social vulnerability.\" Portland's program is voluntary and individual, and the city does not appear to have directed residents to specific receiving areas based on available evidence. Vanucchi et al. (2025) note that Austin's program \"adopts federal standards for urban relocation assistance that helps people find replacement housing\"; whether Portland's BES program provides equivalent support is not documented in the reviewed sources.\n\n**Coding rationale:** No specific receiving-area planning codes are assigned. The absence of evidence is itself a meaningful finding for this case.\n\n---\n\n### What uses were planned for retreat lands?\n\n**Direct Answer:** The following categories are supported by the reviewed sources:\n\n- **Natural use:** The primary post-buyout intent is floodplain restoration — allowing land to return to natural conditions including wetlands and riparian habitats. Lloyd et al. (2026) describe the Johnson Creek Restoration Plan as including floodplain restoration, and Portland practitioners reference \"restoring floodplains\" as a program goal.\n- **Demolition/infrastructure removal:** All HMGP-funded acquisitions require demolition of structures (Siders, 2018; Vanucchi et al., 2025).\n- **Ownership transfer:** Properties are transferred from private to public ownership under FEMA requirements (Siders, 2018).\n- **Maintenance:** Lloyd et al. (2026) note that \"vacant properties must still be managed, which loads further responsibility onto local governments.\" Vanucchi et al. (2025) extensively document ongoing maintenance as a challenge and common practice for buyout parcels.\n- **Multi-purpose use:** Retreat lands serve both flood storage and ecological/recreational functions. Portland practitioners describe greenspace creation alongside flood mitigation (Lloyd et al., 2026).\n- **Conservation land trust:** FEMA deed restrictions establish perpetual open-space requirements (Siders, 2018).\n- **Recognition of retreat land benefits:** Lloyd et al. (2026) describe how Portland practitioners frame greenspace creation as a community benefit and flood mitigation co-benefit.\n\n**Limited or uncertain evidence for:** Site design & restoration (general intent is described but Portland-specific documentation of a restoration design is not available in the reviewed sources), planting/landscaping (implied by the restoration goal but not directly documented for East Lents), rezoning (a best practice described by Vanucchi et al. (2025) but not directly documented for Portland), commemoration (no evidence found).\n\n**Uncertainty note:** The extensive list of post-buyout uses coded in Version 1 was flagged by the auditor as over-broad. This version retains only those categories directly supported by source text referring to Portland or directly applicable HMGP requirements.\n\n---"
},
{
"case_id": "CS23",
"chunk_index": 4,
"section": "community_engagement",
"location": "Portland, Oregon",
"country": "United States",
"country_normalized": "United States",
"continent": "North America",
"admin_area": "Oregon",
"source": "Pipeline Ver2 — Portland",
"source_links": [
{
"title": "Siders, A. R. (2019). Social justice implications of US managed retreat buyout programs. Climatic Change, 152(2), 239-257. https://doi.org/10.1007/s10584-018-2272-5",
"doi": "10.1007/s10584-018-2272-5",
"url": "https://doi.org/10.1007/s10584-018-2272-5"
},
{
"title": "Bower, E. R., Siders, A., Kraan, C. M., Mach, K. J., & Wong-Parodi, G. (2025). Navigating justice tensions in managed retreat. Environmental Science & Policy, 172, 104191. https://doi.org/10.1016/j.envsci.2025.104191",
"doi": "10.1016/j.envsci.2025.104191",
"url": "https://doi.org/10.1016/j.envsci.2025.104191"
},
{
"title": "Rashid, M. S., & Sutley, E. J. (2026). Managed retreat in the face of sea level rise: A multi-dimensional framework for climate resilience. International Journal of Disaster Risk Reduction, 132, 105952. https://doi.org/10.1016/j.ijdrr.2025.105952",
"doi": "10.1016/j.ijdrr.2025.105952",
"url": "https://doi.org/10.1016/j.ijdrr.2025.105952"
},
{
"title": "Lloyd, R., Pallathadka, A., Sauer, J., Chang, H., Iwaniec, D. M., Ajibade, I., Cook, E. M., & et al. (2026). From red tape to red infrastructure—Insights from urban flood risk management practitioners in four US cities. Urban Transitions, 6, 100036. https://doi.org/10.1016/j.ubtr.2026.100036",
"doi": "10.1016/j.ubtr.2026.100036",
"url": "https://doi.org/10.1016/j.ubtr.2026.100036"
},
{
"title": "Seong, K., Van Zandt, S., Peacock, W. G., & Newman, G. (2025). Racial and Ethnic Change in Floodplain Buyout Neighborhoods: Twenty-Five Years of Evidence from Houston. Journal of Planning Education and Research. https://doi.org/10.1177/0739456x251397310",
"doi": "10.1177/0739456x251397310",
"url": "https://doi.org/10.1177/0739456x251397310"
},
{
"title": "Vanucchi, J., Shi, L., & Hulet, C. (2025). Reconciliation or restoration? The ecological futures of floodplain buyout sites. Frontiers in Climate, 7. https://doi.org/10.3389/fclim.2025.1530483",
"doi": "10.3389/fclim.2025.1530483",
"url": "https://doi.org/10.3389/fclim.2025.1530483"
},
{
"title": "City of Portland Bureau of Environmental Services. (2012). East Lents Floodplain Restoration Project. Portland, Oregon. https://www.portlandoregon.gov/bes/article/286175",
"url": "https://www.portlandoregon.gov/bes/article/286175"
},
{
"title": "OregonLive. (2012, December). East Lents floodplain project. https://www.oregonlive.com/gresham/2012/12/east_lents_floodplain_project.html",
"url": "https://www.oregonlive.com/gresham/2012/12/east_lents_floodplain_project.html"
},
{
"title": "Vanucchi, J., Shi, L., & Hulet, C. (2025). Reconciliation or restoration? The ecological futures of floodplain buyout sites. Frontiers in Climate, 7, 1530483. https://doi.org/10.3389/fclim.2025.1530483",
"url": "https://doi.org/10.3389/fclim.2025.1530483"
},
{
"title": "Siders, A.R. (2018). Social justice implications of US managed retreat buyout programs. Climatic Change, 152(2), 239-257. https://doi.org/10.1007/s10584-018-2272-5",
"url": "https://doi.org/10.1007/s10584-018-2272-5"
},
{
"title": "Seong, K., Van Zandt, S., Peacock, W., & Newman, G. (2025). Racial and Ethnic Change in Floodplain Buyout Neighborhoods: Twenty-Five Years of Evidence from Houston. Journal of the American Planning Association. https://doi.org/10.1177/0739456x251397310",
"url": "https://doi.org/10.1177/0739456x251397310"
},
{
"title": "Bower, E., Siders, A.R., Kraan, C., Mach, K.J., & Wong-Parodi, G. (2025). Navigating justice tensions in managed retreat. Environmental Science & Policy, 164, 104191. https://doi.org/10.1016/j.envsci.2025.104191",
"url": "https://doi.org/10.1016/j.envsci.2025.104191"
},
{
"title": "Lloyd, R., Pallathadka, A., Sauer, J., Chang, H., Iwaniec, D.M., Ajibade, I., Cook, E., Berbés-Blázquez, M., Grimm, N.B., & Post, G. (2026). From Red Tape to Red Infrastructure: Insights from Urban Flood Risk Management Practitioners in Four US Cities. Urban and Transportation Reviews. https://doi.org/10.1016/j.ubtr.20",
"url": "https://doi.org/10.1016/j.ubtr.2026.100036"
},
{
"title": "Rashid, M.S., & Sutley, E. (2025). Managed Retreat in the Face of Sea Level Rise: A Multi-Dimensional Framework for Climate Resilience. International Journal of Disaster Risk Reduction, 105952. https://doi.org/10.1016/j.ijdrr.2025.105952",
"url": "https://doi.org/10.1016/j.ijdrr.2025.105952"
}
],
"text": "Case study: Portland (Portland, Oregon, United States)\nSection: COMMUNITY ENGAGEMENT\n\n---\n\n### What degree of choice was provided to affected people in the MR decision process?\n\n**Direct Answer: Voluntary with incentives or future restrictions.**\n\n**Narrative:** All FEMA HMGP-funded buyouts in the United States are designated as voluntary — homeowners may choose whether or not to accept a purchase offer, and local officials cannot use eminent domain or condemnation powers under HMGP (Siders, 2018). Portland's program follows this model; Lloyd et al. (2026) describe it as a \"Willing Seller Program.\"\n\nHowever, Siders (2018) and Bower et al. (2025) note that voluntariness in practice can be more complex: residents may experience coercive elements such as peer pressure, difficulty reselling flood-damaged homes, and legal restrictions against rebuilding substantially damaged structures, which can blur the line between fully voluntary and lightly coerced participation. Future floodplain restrictions and open-space deed restrictions on acquired land also mean that participation, while technically optional, involves future land-use constraints.\n\n**Coding rationale:** \"Voluntary with incentives or future restrictions\" best captures the situation: participation is technically optional, but future floodplain restrictions create structural incentives that encourage participation. There is no evidence of strong persuasion or involuntary elements in the East Lents case.\n\n---\n\n### What land user groups were involved or considered in the MR decision process?\n\n**Direct Answer: Homeowners; Government.**\n\n**Narrative:** The primary land user group is residential homeowners in the East Lents floodplain. The City of Portland (through BES) is the government actor acquiring properties. No evidence in the reviewed sources indicates involvement of commercial property owners, renters, First Nations/Indigenous groups, or community/NGO landholders in this specific project.\n\nSiders (2018) notes that renters are affected by buyout programs but are often excluded from direct compensation under HMGP (which funds property owners). This concern may apply to Portland but is not directly documented for East Lents.\n\n---\n\n### What actors participated in the governance structure of the MR decision process?\n\n**Direct Answer: Government agencies; Funders; Academics/researchers. Evidence for other actors is limited or indirect.**\n\n**Narrative:**\n\n- **Government agencies:** Directly supported. Portland BES (primary administrator), City of Portland bureaus, Multnomah County, Oregon state agencies, FEMA Region 10. Lloyd et al. (2026) Appendix A provides an extensive list.\n- **Funders:** Directly supported. FEMA (federal), state of Oregon, and City of Portland are funding actors (Siders, 2018; Lloyd et al., 2026).\n- **Academics/researchers:** Supported. The Lloyd et al. (2026) study represents academic engagement with Portland practitioners, and Portland practitioners participated in the research process.\n- **Affected community:** Partially supported. Lloyd et al. (2026) describe Portland practitioners as engaged in community outreach and describe homeowners participating as willing sellers, but specific governance-level participation by affected community members in the East Lents decision process is not documented.\n- **"
}
]