Commit History

  1. in page Settings remove help and support

    Verified signature
    8a3d375
  2. remove performance trend graph

    Verified signature
    160f979
  3. if possible make the performance trend graph a line graph where the completed ,pending and in progress compete with each others

    Verified signature
    1124769
  4. on the page Report the graph "performance trend" make it more advanced with more info and make it make sense

    Verified signature
    a0dd381
  5. Promote version cc93e8a to main⁠

    Verified signature
    07b8f66
  6. Task page also know as index page needs to allow me to add tasks and place them in the right category

    Verified signature
    9e3cf6c
  7. Task page reactivate the page and the blue block "add task" allowing me to add task

    Verified signature
    8339c61
  8. bring back the task and allow the "add task" to be active and clickable and functionable

    Verified signature
    8c8e5b9
  9. active the add task so i can add task

    Verified signature
    2d55d7a
  10. re active the add task

    Verified signature
    3d566cc
  11. task page the "total Task" "completed" "pending " and "high priority" when i click on them it shows a pop up to whats it is linked to so i can refer to it and once click away from the pop up it vanishes allowing to progress where i stopped

    Verified signature
    1c65eb1
  12. once the task is seen on the pop up if i click off the pop up it has to vanish allowing me to see the calendar once more and this action can be repeated

    Verified signature
    cc93e8a
  13. in calendar i need to see what it is so when i click on the date of the task the task pops up allowing me to read the whole thing

    Verified signature
    2207d90
  14. in report on with the graphs add "in progress" as well and the comment section needs to be linked to task and date so i can type the issues on them as well on the graph numbering . task comment should be linked to task to type on the task matter . setting page. on email section when selected allow to type email so email can send notification. activate data management . as well performance line graph in report page

    Verified signature
    5274beb
  15. the calendar should allow me to select a date to see more info on the task and based on what date i select to the task i select the dates in between must be high lighted if 15 days gap selected to the selected task date on the calendar it should high light green if 10 days orange if 5 red so between these number the colors are defind as well when i click on a date of the task a small pop up so i can read it out. for report page active it and place a block (comment) on the task if any thing have been an issue for the seeting page active it with option to click on that help and change what ever needs to be

    Verified signature
    15b59ae
  16. page calendar active it

    Verified signature
    06d6aa3
  17. initial commit

    Verified signature
    1e7bcb9