taskmaster-pro / reports.html

Commit History

  1. remove performance trend graph

    Verified signature
    160f979
  2. if possible make the performance trend graph a line graph where the completed ,pending and in progress compete with each others

    Verified signature
    1124769
  3. on the page Report the graph "performance trend" make it more advanced with more info and make it make sense

    Verified signature
    a0dd381
  4. in report on with the graphs add "in progress" as well and the comment section needs to be linked to task and date so i can type the issues on them as well on the graph numbering . task comment should be linked to task to type on the task matter . setting page. on email section when selected allow to type email so email can send notification. activate data management . as well performance line graph in report page

    Verified signature
    5274beb
  5. the calendar should allow me to select a date to see more info on the task and based on what date i select to the task i select the dates in between must be high lighted if 15 days gap selected to the selected task date on the calendar it should high light green if 10 days orange if 5 red so between these number the colors are defind as well when i click on a date of the task a small pop up so i can read it out. for report page active it and place a block (comment) on the task if any thing have been an issue for the seeting page active it with option to click on that help and change what ever needs to be

    Verified signature
    15b59ae