Spaces:
Running
Running
Commit History
-
Promote version cc93e8a to main
Verified signaturePromoted commit cc93e8a19be5de12006a5d272c0e5eed334512ec to main branch07b8f66 -
Task page reactivate the page and the blue block "add task" allowing me to add task
Verified signature8339c61 -
bring back the task and allow the "add task" to be active and clickable and functionable
Verified signature8c8e5b9 -
active the add task so i can add task
Verified signature2d55d7a -
re active the add task
Verified signature3d566cc -
task page the "total Task" "completed" "pending " and "high priority" when i click on them it shows a pop up to whats it is linked to so i can refer to it and once click away from the pop up it vanishes allowing to progress where i stopped
Verified signature1c65eb1 -
in report on with the graphs add "in progress" as well and the comment section needs to be linked to task and date so i can type the issues on them as well on the graph numbering . task comment should be linked to task to type on the task matter . setting page. on email section when selected allow to type email so email can send notification. activate data management . as well performance line graph in report page
Verified signature5274beb -
the calendar should allow me to select a date to see more info on the task and based on what date i select to the task i select the dates in between must be high lighted if 15 days gap selected to the selected task date on the calendar it should high light green if 10 days orange if 5 red so between these number the colors are defind as well when i click on a date of the task a small pop up so i can read it out. for report page active it and place a block (comment) on the task if any thing have been an issue for the seeting page active it with option to click on that help and change what ever needs to be
Verified signature15b59ae -
page calendar active it
Verified signature06d6aa3