Spaces:
Running
Running
Commit History
-
in page Settings remove help and support
Verified signature8a3d375 -
in report on with the graphs add "in progress" as well and the comment section needs to be linked to task and date so i can type the issues on them as well on the graph numbering . task comment should be linked to task to type on the task matter . setting page. on email section when selected allow to type email so email can send notification. activate data management . as well performance line graph in report page
Verified signature5274beb -
the calendar should allow me to select a date to see more info on the task and based on what date i select to the task i select the dates in between must be high lighted if 15 days gap selected to the selected task date on the calendar it should high light green if 10 days orange if 5 red so between these number the colors are defind as well when i click on a date of the task a small pop up so i can read it out. for report page active it and place a block (comment) on the task if any thing have been an issue for the seeting page active it with option to click on that help and change what ever needs to be
Verified signature15b59ae