from dataclasses import dataclass, field
from datetime import date, timedelta
from typing import List, Optional, Annotated, Union, Set
from solverforge_legacy.solver import SolverStatus
from solverforge_legacy.solver.score import HardSoftScore
from solverforge_legacy.solver.domain import (
planning_entity,
planning_solution,
PlanningId,
PlanningVariable,
PlanningEntityCollectionProperty,
ProblemFactCollectionProperty,
ProblemFactProperty,
ValueRangeProvider,
PlanningScore,
)
from .json_serialization import JsonDomainBase
from pydantic import Field
# ************************************************************************
# Utility functions for working day calculations
# ************************************************************************
def calculate_end_date(start_date: Optional[date], duration_in_days: int) -> Optional[date]:
"""
Calculate the end date by adding working days to the start date, skipping weekends.
The end date is exclusive (like Java's implementation).
Args:
start_date: The start date (inclusive)
duration_in_days: Number of working days the job takes
Returns:
The end date (exclusive), or None if start_date is None
"""
if start_date is None:
return None
# Skip weekends. Does not work for holidays.
# Keep in sync with create_start_date_range().
# Formula: For every 5 working days plus the weekday offset, add 2 weekend days
# Python weekday(): Monday=0, Tuesday=1, ..., Sunday=6
weekend_padding = 2 * ((duration_in_days + start_date.weekday()) // 5)
return start_date + timedelta(days=duration_in_days + weekend_padding)
def count_working_days_between(start: date, end: date) -> int:
"""
Count the number of working days (Mon-Fri) between two dates.
Args:
start: Start date (inclusive)
end: End date (exclusive)
Returns:
Number of working days between the dates
"""
if start >= end:
return 0
count = 0
current = start
while current < end:
if current.weekday() < 5: # Monday=0 to Friday=4
count += 1
current += timedelta(days=1)
return count
def create_start_date_range(from_date: date, to_date: date) -> List[date]:
"""
Generate a list of working days (Mon-Fri) within the date range.
Args:
from_date: Start of range (inclusive)
to_date: End of range (exclusive)
Returns:
List of working days in the range
"""
dates = []
current = from_date
while current < to_date:
if current.weekday() < 5: # Monday=0 to Friday=4
dates.append(current)
current += timedelta(days=1)
return dates
# ************************************************************************
# Domain classes
# ************************************************************************
@dataclass
class WorkCalendar:
"""Defines the planning window for the schedule."""
id: Annotated[str, PlanningId]
from_date: date # Inclusive
to_date: date # Exclusive
@dataclass
class Crew:
"""A maintenance crew that can be assigned to jobs."""
id: Annotated[str, PlanningId]
name: str
def __hash__(self):
return hash(self.id)
def __eq__(self, other):
if isinstance(other, Crew):
return self.id == other.id
return False
def __str__(self):
return f"{self.name}({self.id})"
@planning_entity
@dataclass
class Job:
"""
A maintenance job that needs to be scheduled.
Planning variables:
- crew: The crew assigned to this job
- start_date: When the job starts (inclusive)
The end_date is computed from start_date and duration_in_days.
"""
id: Annotated[str, PlanningId]
name: str
duration_in_days: int
min_start_date: date # Inclusive - earliest the job can start
max_end_date: date # Exclusive - latest the job can end
ideal_end_date: date # Exclusive - preferred end date
tags: Set[str] = field(default_factory=set)
# Planning variables
crew: Annotated[Optional[Crew], PlanningVariable] = None
start_date: Annotated[Optional[date], PlanningVariable] = None
def get_end_date(self) -> Optional[date]:
"""Calculate the end date based on start_date and duration."""
return calculate_end_date(self.start_date, self.duration_in_days)
@property
def end_date(self) -> Optional[date]:
"""End date property for convenient access."""
return self.get_end_date()
def calculate_overlap(self, other: "Job") -> int:
"""
Calculate the number of overlapping working days with another job.
Args:
other: The other job to compare with
Returns:
Number of overlapping working days
"""
if self.start_date is None or other.start_date is None:
return 0
self_end = self.get_end_date()
other_end = other.get_end_date()
if self_end is None or other_end is None:
return 0
# Calculate overlap range
overlap_start = max(self.start_date, other.start_date)
overlap_end = min(self_end, other_end)
if overlap_start >= overlap_end:
return 0
return count_working_days_between(overlap_start, overlap_end)
def get_common_tags(self, other: "Job") -> Set[str]:
"""Get the tags that both jobs share."""
return self.tags & other.tags
def __str__(self):
return f"{self.name}({self.id})"
@planning_solution
@dataclass
class MaintenanceSchedule:
"""
The planning solution containing the schedule to be optimized.
"""
work_calendar: Annotated[WorkCalendar, ProblemFactProperty]
crews: Annotated[List[Crew], ProblemFactCollectionProperty, ValueRangeProvider]
jobs: Annotated[List[Job], PlanningEntityCollectionProperty]
start_date_range: Annotated[
List[date], ProblemFactCollectionProperty, ValueRangeProvider
] = field(default_factory=list)
score: Annotated[Optional[HardSoftScore], PlanningScore] = None
solver_status: SolverStatus = SolverStatus.NOT_SOLVING
def __post_init__(self):
"""Initialize start_date_range if not provided."""
if not self.start_date_range and self.work_calendar:
self.start_date_range = create_start_date_range(
self.work_calendar.from_date,
self.work_calendar.to_date
)
# ************************************************************************
# Pydantic REST models for API
# ************************************************************************
class WorkCalendarModel(JsonDomainBase):
id: str
from_date: str = Field(..., alias="fromDate") # ISO date string
to_date: str = Field(..., alias="toDate")
class CrewModel(JsonDomainBase):
id: str
name: str
class JobModel(JsonDomainBase):
id: str
name: str
duration_in_days: int = Field(..., alias="durationInDays")
min_start_date: str = Field(..., alias="minStartDate")
max_end_date: str = Field(..., alias="maxEndDate")
ideal_end_date: str = Field(..., alias="idealEndDate")
tags: List[str] = Field(default_factory=list)
crew: Optional[Union[str, CrewModel]] = None
start_date: Optional[str] = Field(None, alias="startDate")
end_date: Optional[str] = Field(None, alias="endDate")
class MaintenanceScheduleModel(JsonDomainBase):
work_calendar: WorkCalendarModel = Field(..., alias="workCalendar")
crews: List[CrewModel]
jobs: List[JobModel]
start_date_range: List[str] = Field(default_factory=list, alias="startDateRange")
score: Optional[str] = None
solver_status: Optional[str] = Field(None, alias="solverStatus")