File size: 470 Bytes
37b85de 816718a | 1 2 3 4 5 6 7 8 9 | # Deep audit 2026-07-10 — S3 backlog (deferred polish)
Empty — all audit findings resolved as of 2026-07-11. S1 shipped in
Wave 1, S2 in Wave 2, the S3 sweep in Wave 3, and the five deferred
design-call items (global toast channel, share-hash plugin-default
rehydration, lineage-legend-as-chrome + guidance budget, CircuitDiff
shared scroll container, figure-export zip packaging) in the final
wave — see the corresponding sections in docs/EVIDENCE_WORKBENCH.md.
|