Commit History

  1. feat(researcher): DCE-MRI BBB permeability bridge + drug-dose adjuster⁠

    mekosotto +1: Claude Opus 4.7 (1M context)
    327b23d
  2. docs(plan): swap OASIS branch for EEG stub plan; soften MRI prerequisite⁠

    mekosotto +1: Claude Opus 4.7 (1M context)
    8ec95a0
  3. docs(plan): external assets integration (MRI DL 2D + TF-IDF RAG + OASIS tabular)⁠

    mekosotto +1: Claude Opus 4.7 (1M context)
    270f76f
  4. docs(plan): clinical platform roadmap + fusion engine plan⁠

    mekosotto +1: Claude Opus 4.7 (1M context)
    44397bd
  5. superpowerfixes.md

    0435d80
  6. docs(plan): orchestrator agent + RAG feedback implementation plan

    582bce2
  7. project overvew udpate

    0673175
  8. chore: add real-llm-rationale plan + ignore .worktrees/⁠

    mekosotto +1: Claude Opus 4.7 (1M context)
    26adc32

  1. docs(plan): Day-8 Grand Finale — multi-modal agents, Track 5, HF deploy⁠

    mekosotto +1: Claude Opus 4.7 (1M context)
    427f449
  2. docs(plan): Day-7 implementation plan — drift, traceability, agents⁠

    mekosotto +1: Claude Opus 4.7 (1M context)
    c4a01f0
  3. docs(plan): add Day-6 final-polish + demo-features plan⁠

    mekosotto +1: Claude Opus 4.7 (1M context)
    62d4000
  4. docs(plan): add Day-5 downstream-model + XAI + interactive plan⁠

    mekosotto +1: Claude Opus 4.7 (1M context)
    297ad76

  1. docs(plan): add Day-4 API/MLOps/frontend implementation plan⁠

    mekosotto +1: Claude Opus 4.7 (1M context)
    9e9b239
  2. docs(plan): add Day-3 MRI ComBat pipeline plan

    4335f6a
  3. docs(plan): use correlation-based find_bads_eog to fix ICA on small recordings⁠

    ac25478
  4. docs: add Day 2 EEG MNE+ICA pipeline plan⁠

    dc611c3
  5. chore: track planning docs and ignore .sixth/ tooling dir⁠

    mekosotto +1: Claude Sonnet 4.6
    938399b